# General Dynamics Corp: Form 10-Q for the period ended Sep 30, 2012

- Company: [General Dynamics Corp](/companies/gd.md) (CIK 40533)
- Form: 10-Q
- Filed: 2012-10-30
- Accepted by EDGAR: Oct 30, 2012, 15:16 ET
- Period: 2012-09-30
- Accession: 0000040533-12-000007
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/40533/000004053312000007/gd-2012093010q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/40533/000004053312000007/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2012-09-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2012-07-02 to 2012-09-30 | $7.93bn | us-gaap:Revenues |
| Revenue | 9 months, 2012-01-01 to 2012-09-30 | $23.43bn | us-gaap:Revenues |
| Cost of revenue | 3 months, 2012-07-02 to 2012-09-30 | $6.52bn | us-gaap:CostOfRevenue |
| Cost of revenue | 9 months, 2012-01-01 to 2012-09-30 | $19.13bn | us-gaap:CostOfRevenue |
| Operating income | 3 months, 2012-07-02 to 2012-09-30 | $905.0m | us-gaap:OperatingIncomeLoss |
| Operating income | 9 months, 2012-01-01 to 2012-09-30 | $2.73bn | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2012-07-02 to 2012-09-30 | $40.0m | us-gaap:InterestExpense |
| Interest expense | 9 months, 2012-01-01 to 2012-09-30 | $124.0m | us-gaap:InterestExpense |
| Income tax | 3 months, 2012-07-02 to 2012-09-30 | $263.0m | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 9 months, 2012-01-01 to 2012-09-30 | $814.0m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2012-07-02 to 2012-09-30 | $600.0m | us-gaap:NetIncomeLoss |
| Net income | 9 months, 2012-01-01 to 2012-09-30 | $1.80bn | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2012-07-02 to 2012-09-30 | $1.70 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 9 months, 2012-01-01 to 2012-09-30 | $5.04 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2012-07-02 to 2012-09-30 | $1.71 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 9 months, 2012-01-01 to 2012-09-30 | $5.08 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2012-07-02 to 2012-09-30 | 352,826,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 9 months, 2012-01-01 to 2012-09-30 | 356,519,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 9 months, 2012-01-01 to 2012-09-30 | $1.91bn | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 9 months, 2012-01-01 to 2012-09-30 | $286.0m | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Dividends paid | 3 months, 2012-07-02 to 2012-09-30 | −$180.0m | us-gaap:PaymentsOfDividends |
| Dividends paid | 9 months, 2012-01-01 to 2012-09-30 | $533.0m | us-gaap:PaymentsOfDividends |
| Share repurchases | 9 months, 2012-01-01 to 2012-09-30 | $602.0m | us-gaap:PaymentsForRepurchaseOfCommonStock |
| Cash and equivalents | at 2012-09-30 | $2.87bn | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2012-09-30 | $15.59bn | us-gaap:AssetsCurrent |
| Total assets | at 2012-09-30 | $35.50bn | us-gaap:Assets |
| Current liabilities | at 2012-09-30 | $12.19bn | us-gaap:LiabilitiesCurrent |
| Long-term debt | at 2012-09-30 | $2.92bn | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2012-09-30 | $1.00bn | us-gaap:DebtCurrent |
| Shareholders' equity | at 2012-09-30 | $14.27bn | us-gaap:StockholdersEquity |
| Shares outstanding | at 2012-09-30 | 353,069,806 shares | dei:EntityCommonStockSharesOutstanding |

## Management's discussion and analysis

As filed, 47,475 characters.

### BUSINESS OVERVIEW

General Dynamics offers a broad portfolio of products and services in business aviation; combat vehicles, weapons systems and munitions; military and commercial shipbuilding; and communications and information technology. We operate through four business groups: Aerospace, Combat Systems, Marine Systems and Information Systems and Technology. Our primary customers are the U.S. government, including the Department of Defense, Department of Homeland Security, the intelligence community and other civilian agencies; international governments; and a diverse base of corporate and individual buyers of business jets. We operate in two primary markets, defense and business aviation, with the majority of our revenues from contracts with the U.S. government. The following discussion should be read in conjunction with our 2011 Annual Report on Form 10-K and with the unaudited Consolidated Financial Statements included in this Form 10-Q.

### DEFENSE BUSINESS ENVIRONMENT

As a defense contractor, our financial performance is impacted by the allocation and prioritization of U.S. defense spending. Several factors are currently impacting U.S. defense spending, including the fact that the Congress has not approved the President's fiscal year (FY) 2013 budget request. Consequently, the U.S. government, including the Department of Defense, is operating under a continuing resolution (CR) that provides funding at FY 2012 levels through March 2013. However, a CR does not fund new contract starts or multi-year contracts and historically has slowed the pace of funding for our existing contracts.

Additionally, U.S. defense spending has been negatively impacted by the Budget Control Act of 2011. The Budget Control Act of 2011 has two primary parts that affect future defense spending. The first part mandates a $487 billion reduction to previously-planned defense spending over the next decade. These cuts are incorporated into the FY 2013 proposed defense budget. The second part is a sequester mechanism that would impose an additional $500 billion of cuts on defense spending between FY 2013 and FY 2021 if the Congress does not identify a means to reduce the U.S. deficit by $1.2 trillion by year end. As of October 30, 2012, the means have not been identified by Congress. Given the uncertainty regarding how the Congress will reduce the U.S. deficit and a lack of specifics on how cuts will be implemented, we are unable to predict the impact, which could be material, on our programs or financial outlook, including our revenues, operating earnings and margins, cash flow, orders and backlog and recovery of long-lived assets. However, funding reductions of the magnitude imposed by the sequester mechanism as written could have material operational consequences to our employee base, facilities and suppliers.

### RESULTS OF OPERATIONS

### INTRODUCTION

We recognize the majority of our revenues using the percentage-of-completion method of accounting. The following paragraphs explain how this method is applied in recognizing revenues and operating costs in our Aerospace and defense business groups. An understanding of our practices is important to an evaluation of our operating results.

In the Aerospace group, contracts for new aircraft have two major phases: the manufacture of the

“green” aircraft and the aircraft’s outfitting, which includes exterior painting and installation of customer-selected interiors. We record revenues on these contracts at the completion of these two phases: when green aircraft are delivered to and accepted by the customer, and when the customer accepts final delivery of the outfitted aircraft. Revenues in the Aerospace group’s other original equipment manufacturers (OEMs) completions and services businesses are recognized as work progresses or upon delivery of services. Changes in revenues result from the number and mix of new aircraft deliveries (green and outfitted), progress on aircraft completions and the level of aircraft service activity during the period.

The majority of the Aerospace group’s operating costs relates to new aircraft production for firm orders and consists of labor, material and overhead costs. The costs are accumulated in production lots and recognized as operating costs at green aircraft delivery based on the estimated average unit cost in a production lot. While changes in the estimated average unit cost for a production lot impact the level of operating costs, the amount of operating costs reported in a given period is based largely on the number and type of aircraft delivered. Operating costs in the Aerospace group’s other OEMs completions and services businesses are generally recognized as incurred.

For new aircraft, operating earnings and margins are a function of the prices of our aircraft, our operational efficiency in manufacturing and outfitting the aircraft and the mix of aircraft deliveries between the higher-margin large-cabin and lower-margin mid-cabin aircraft. Additional factors affecting the group’s earnings and margins include the volume, mix and profitability of completions and services work performed, the market for pre-owned aircraft and the level of general and administrative (G&A) and net research and development (R&D) costs incurred by the group.

In the defense groups, revenue on long-term government contracts is recognized as work progresses, either as products are produced or services are rendered. As a result, changes in revenues are discussed generally in terms of volume, typically measured by the level of activity on individual contracts. Year-over-year variances attributed to volume indicate increases or decreases in revenues due to changes in production or service levels and delivery schedules.

Operating costs for the defense groups consist of labor, material, subcontractor and overhead costs and are generally recognized as incurred. Variances in costs recognized from period to period primarily reflect increases and decreases in production or activity levels on individual contracts and, therefore, result largely from the same factors that drive variances in revenues.

Operating earnings and margins in the defense groups are driven by changes in volume, performance or contract mix. Performance refers to changes in profitability based on revisions to estimates at completion on individual contracts. These revisions result from increases or decreases to the estimated value of the contract or the estimated costs to complete. Therefore, changes in costs incurred in the period do not necessarily impact profitability. It is only when total estimated costs at completion change that profitability may be impacted. Contract mix refers to changes in the volume of higher- vs. lower-margin work on individual contracts and when aggregated across the contract portfolio. On an individual contract, higher or lower margins can be inherent in the contract type (e.g., fixed-price/cost-reimbursable) or type of work (e.g., development/production).

### CONSOLIDATED OVERVIEW

| Three Months Ended | October 2, 2011 | September 30, 2012 | Variance |
| --- | ---: | ---: | ---: |
| Revenues | $7,853 | $7,934 | $81 1.0% |
| Operating costs and expenses | 6,855 | 7,029 | 174 2.5% |
| Operating earnings | 998 | 905 | (93) (9.3)% |
| Operating margins | 12.7% | 11.4% |  |
| Nine Months Ended | October 2, 2011 | **September 30, 2012** | Variance |
| Revenues | $23,530 | $23,435 | $(95) (0.4)% |
| Operating costs and expenses | 20,654 | 20,700 | 46 0.2% |
| Operating earnings | 2,876 | 2,735 | (141) (4.9)% |
| Operating margins | 12.2% | 11.7% |  |

Our revenues and operating costs were up in the third quarter of 2012 compared with the prior-year period driven primarily by the Aerospace group’s green deliveries of G650 aircraft, which commenced in the fourth quarter of 2011. These increases were largely offset by lower volume in the Information Systems and Technology group’s tactical communications systems business and on several U.S. and international wheeled vehicle contracts in the Combat Systems group. In the first nine months of 2012, the volume decreases in the Information Systems and Technology and Combat Systems groups described above exceeded the impact of G650 aircraft deliveries. Operating earnings and margins in the third quarter and first nine months of 2012 were down primarily due to the shift in volume from higher margin tactical communications products to lower margin information technology services in the Information Systems and Technology group.

### PRODUCT REVENUES AND OPERATING COSTS

| Three Months Ended | October 2, 2011 | September 30, 2012 | Variance |
| --- | ---: | ---: | ---: |
| Revenues | $5,070 | $4,967 | $(103) (2.0)% |
| Operating costs | 3,991 | 4,012 | 21 0.5% |
| Nine Months Ended | October 2, 2011 | **September 30, 2012** | Variance |
| Revenues | $15,186 | $14,672 | $(514) (3.4)% |
| Operating costs | 12,005 | 11,712 | (293) (2.4)% |

Product revenues were lower in the third quarter and the first nine months of 2012 compared with the prior-year periods. The decrease in product revenues consisted of the following:

|  | Third Quarter | Nine Months |
| --- | ---: | ---: |
| Aircraft manufacturing, outfitting and completions | $412 | $906 |
| European vehicles production | (103) | (200) |
| Tactical communications products | (237) | (893) |
| Ship construction | (73) | (146) |
| Other, net | (102) | (181) |
| Total decrease | $(103) | $(514) |

In 2012, aircraft manufacturing, outfitting and completions revenues increased due to green deliveries of G650 aircraft, which began in the fourth quarter of 2011. Offsetting this increase were lower European vehicles production revenues largely due to multiple wheeled vehicle contracts for various international customers that are nearing completion. Tactical communication products revenues decreased due to protracted customer acquisition cycles and a slower than expected transition to follow-on work on several programs. Ship construction revenues decreased due to lower volume on the T-AKE combat-logistics ship program, which is nearing completion, and timing on the Virginia-class submarine program as the group transitions from the Block II to the Block III contract.

Product operating costs were higher in the third quarter but lower in the first nine months of 2012 compared with the prior-year periods. The change in product operating costs consisted of the following:

| Volume: | Third Quarter | Nine Months |
| --- | ---: | ---: |
| Aircraft manufacturing, outfitting and completions | $322 | $681 |
| European vehicles production | (81) | (163) |
| Tactical communication products | (144) | (653) |
| Ship construction | (67) | (178) |
| Other changes, net | (9) | 20 |
| Total increase (decrease) | $21 | $(293) |

As the table above demonstrates, the primary driver of the changes in product operating costs in the third quarter and first nine months of 2012 was volume. No other changes were material.

### SERVICE REVENUES AND OPERATING COSTS

| Three Months Ended | October 2, 2011 | September 30, 2012 | Variance |
| --- | ---: | ---: | ---: |
| Revenues | $2,783 | $2,967 | $184 6.6% |
| Operating costs | 2,372 | 2,507 | 135 5.7% |
| Nine Months Ended | October 2, 2011 | **September 30, 2012** | Variance |
| Revenues | $8,344 | $8,763 | $419 5.0% |
| Operating costs | 7,143 | 7,418 | 275 3.8% |

Service revenues increased in the third quarter and first nine months of 2012 compared with the prior-year periods. The increase in service revenues consisted of the following:

|  | Third Quarter | Nine Months |
| --- | ---: | ---: |
| Ship engineering and repair | $144 | $265 |
| Tactical communications support | 11 | 82 |
| Other, net | 29 | 72 |
| Total increase | $184 | $419 |

In 2012, the increase in ship engineering and repair revenues was driven by the acquisition of two East Coast surface-ship repair operations and higher volume on the U.S. Navy’s Ohio-class replacement engineering program. Tactical communications support revenues increased in 2012 primarily due to higher service volume on the U.K.-based Bowman communications systems program, which has transitioned to maintenance and long-term support.

Service operating costs increased in the third quarter and first nine months of 2012 compared with the prior-year periods. The increase in service operating costs consisted of the following:

| Volume: | Third Quarter | Nine Months |
| --- | ---: | ---: |
| Ship engineering and repair | $120 | $221 |
| Tactical communications support | — | 57 |
| Other changes, net | 15 | (3) |
| Total increase | $135 | $275 |

As shown above, the primary driver of the changes in service operating costs in the third quarter and first nine months of 2012 was volume. No other changes were material.

### OTHER INFORMATION

### G&A Expenses

As a percentage of revenues, G&A expenses were 6.7 percent in the first nine months of 2012, compared with 6.4 percent in the prior-year period.

### Interest Expense

Net interest expense in the first nine months of 2012 was $115 compared with $103 in the same period in 2011. The increase in interest expense is due to the $750 net increase in fixed-rate notes beginning in July 2011. We expect full-year 2012 net interest expense to be approximately $155.

### Other, Net

In 2011, other income included a gain from the sale of the detection systems portion of the weapons systems business in our Combat Systems group in the second quarter. The sale resulted in a pretax gain of $38.

### Effective Tax Rate

Our effective tax rate for the first nine months of 2012 was 31.2 percent compared with 30.6 percent in the same period in 2011. We anticipate a full-year 2012 effective tax rate slightly below 32 percent, compared with 31.4 percent in 2011, an increase primarily due to less income from international operations in jurisdictions with lower tax rates and the expiration of the R&D tax credit that Congress has not yet extended for 2012. For additional discussion of tax matters, see Note I to the unaudited Consolidated Financial

Statements.

### Discontinued Operations

In 2011, we recognized a $13 loss, net of taxes, in discontinued operations from the settlement of an environmental matter associated with a former operation of the company in the third quarter. Additionally, the results for the first nine months of 2011 reflect our estimate of the legal costs associated with the A-12 litigation recorded in the second quarter as a result of the U.S. Supreme Court's decision that significantly extended the timeline associated with the litigation. See Note K to the unaudited Consolidated Financial Statements for further discussion of the A-12 litigation, which has been ongoing since 1991.

### REVIEW OF BUSINESS GROUPS

Following is a discussion of operating results and outlook for each of our business groups. For the Aerospace group, results are analyzed with respect to specific lines of products and services, consistent with how the group is managed. For the defense groups, the discussion is based on the types of products and services each group offers with a supplemental discussion of specific contracts and programs when significant to the groups’ results. Information regarding our business groups also can be found in Note M to the unaudited Consolidated Financial Statements.

### AEROSPACE

| Three Months Ended | October 2, 2011 | September 30, 2012 | Variance |
| --- | ---: | ---: | ---: |
| Revenues | $1,412 | $1,836 | $424 30.0% |
| Operating earnings | 217 | 261 | 44 20.3% |
| Operating margin | 15.4% | 14.2% |  |
| Gulfstream aircraft deliveries (in units): |  |  |  |
| Green | 25 | 34 | 9 36.0% |
| Outfitted | 26 | 17 | (9) (34.6)% |
| Nine Months Ended | October 2, 2011 | **September 30, 2012** | Variance |
| Revenues | $4,141 | $5,051 | $910 22.0% |
| Operating earnings | 656 | 789 | 133 20.3% |
| Operating margin | 15.8% | 15.6% |  |
| Gulfstream aircraft deliveries (in units): |  |  |  |
| Green | 72 | 88 | 16 22.2% |
| Outfitted | 72 | 57 | (15) (20.8)% |

### Operating Results

The Aerospace group’s revenues increased in the third quarter and first nine months of 2012 compared with the prior-year periods. The increase consisted of the following:

|  | Third Quarter | Nine Months |
| --- | ---: | ---: |
| Aircraft manufacturing, outfitting and completions | $412 | $906 |
| Aircraft services | (13) | 23 |
| Pre-owned aircraft | 25 | (19) |
| Total increase | $424 | $910 |

Aircraft manufacturing, outfitting and completions revenues include Gulfstream business-jet aircraft as well as completions of aircraft produced by other OEMs. Aircraft manufacturing, outfitting and completions revenues increased in 2012 primarily due to green deliveries of the new G650 aircraft, which began in the fourth quarter of 2011.

The growing global installed base of aircraft has led to increased demand for aircraft services, resulting in higher revenues in the first nine months of 2012. However, lower volume in our maintenance business at Jet Aviation in the third quarter of 2012, particularly in Europe, resulted in decreased aircraft services revenues compared with the prior-year period. Jet Aviation's maintenance business continues to be negatively impacted by an increasingly competitive marketplace.

Pre-owned aircraft sales increased in the third quarter but decreased in the first nine months of 2012. While the group sold fewer aircraft in both periods, the type of aircraft sold in the third quarter resulted in higher revenues when compared with the same period of 2011.

The group's operating earnings increased in the third quarter and first nine months of 2012 compared with 2011. The increase consisted of the following:

|  | Third Quarter | Nine Months |
| --- | ---: | ---: |
| Aircraft manufacturing, outfitting and completions | $53 | $161 |
| Aircraft services | 6 | 6 |
| Pre-owned aircraft | 1 | (1) |
| G&A/other expenses | (16) | (33) |
| Total increase | $44 | $133 |

Aircraft manufacturing, outfitting and completions earnings increased in the third quarter and first nine months of 2012 compared with the prior-year periods primarily due to the additional G650 green deliveries discussed above. These earnings were partially offset by fewer outfitted aircraft deliveries. We expect outfitting earnings to increase in the fourth quarter, driven in part by delivery of several outfitted G650 aircraft.

Aircraft services earnings were up slightly in the third quarter and first nine months of 2012 due to a favorable mix of service work.

In the first nine months of 2012, G&A and other expenses were negatively impacted by higher net R&D expenses, including lower supplier reimbursements of R&D costs.

The group’s operating margins decreased 120 and 20 basis points in the third quarter and first nine months of 2012, respectively, compared with the prior year periods as higher R&D expenses offset growth in the group's higher-margin manufacturing business.

### Outlook

We expect an increase of approximately 16 to 17 percent in the group’s revenues in 2012 compared with 2011. The expected increase is due to additional green deliveries and initial outfitted deliveries of the G650 which received type certification from the FAA in the third quarter of 2012. We expect the Aerospace group’s margins to be in the mid-15 percent range, up from 2011 due to continued strong performance at Gulfstream and improved performance in Jet Aviation’s completions business.

### COMBAT SYSTEMS

| Three Months Ended | October 2, 2011 | September 30, 2012 | Variance |
| --- | ---: | ---: | ---: |
| Revenues | $2,140 | $1,956 | $(184) (8.6)% |
| Operating earnings | 319 | 274 | (45) (14.1)% |
| Operating margins | 14.9% | 14.0% |  |
| Nine Months Ended | October 2, 2011 | **September 30, 2012** | Variance |
| Revenues | $6,216 | $6,016 | $(200) (3.2)% |
| Operating earnings | 895 | 799 | (96) (10.7)% |
| Operating margins | 14.4% | 13.3% |  |

### Operating Results

The Combat Systems group’s revenues decreased in the third quarter and first nine months of 2012 compared with the prior-year periods. The decrease consisted of the following:

|  | Third Quarter | Nine Months |
| --- | ---: | ---: |
| U.S. military vehicles | $(12) | $203 |
| Weapon systems and munitions | (69) | (160) |
| European military vehicles | (103) | (243) |
| Total decrease | $(184) | $(200) |

In the first nine months of 2012, revenues were up in the group’s U.S. military vehicles business due to the December 2011 acquisition of Force Protection, Inc., increased volume on several international export light armored vehicle (LAV) programs and the start of the technology development phase of the Army’s Ground Combat Vehicle (GCV) program. These revenues were partially offset by lower volume on the domestic Stryker, Abrams and Mine-Resistant, Ambush-Protected (MRAP) vehicle programs consistent with our expectations. The decrease in MRAP volume was primarily in the third quarter of 2012 and due to the completion of upgrade kit deliveries, which resulted in lower overall revenues compared with the third quarter of 2011.

Revenues were down in the third quarter of 2012 in the weapons systems and munitions business due to lower armor kit production and axle sales. In the first nine months of 2012, lower volume across several armament and munitions programs combined with the sale of the detection systems business in the second quarter of 2011 resulted in the decrease in revenues.

In the group’s European military vehicle business, revenues were down in 2012 due to lower volume on multiple wheeled vehicle contracts for various international customers that are nearing completion. Final deliveries under several of these contracts are scheduled in the fourth quarter of 2012, including Piranha vehicles for the Belgian Army, Duro vehicles for the Swiss government and EAGLE vehicles for the German government.

The Combat Systems group’s operating margins decreased 90 basis points in the third quarter of

2012 due to lower volume on mature, high-margin production programs, including the U.S. Stryker and Abrams programs, and unfavorable overhead absorption in our European military vehicles business. In the first nine months of 2012, margins were down 110 basis points compared with 2011 due to the negative impact of $67 of prior period adjustments recorded in the first quarter of 2012 at one of our subsidiaries in the European military vehicles business.

### Outlook

We expect the Combat Systems group’s revenues to approximate $8.5 billion in 2012. Lower volume in our domestic U.S. and European military vehicles businesses is expected to be mitigated by growth in international vehicle exports and revenues from the acquisition of Force Protection, Inc. Given the group’s operating results in the first nine months of the year, we expect the group’s full-year operating margin to approximate the mid-13 percent range. This operating margin outlook does not include any potential impact from uncertainties related to the group's Portugal contract. See Note K to the unaudited Consolidated Financial Statements for additional information regarding this contract.

### MARINE SYSTEMS

| Three Months Ended | October 2, 2011 | September 30, 2012 | Variance |
| --- | ---: | ---: | ---: |
| Revenues | $1,621 | $1,670 | $49 3.0% |
| Operating earnings | 173 | 186 | 13 7.5% |
| Operating margins | 10.7% | 11.1% |  |
| Nine Months Ended | October 2, 2011 | **September 30, 2012** | Variance |
| Revenues | $4,873 | $4,928 | $55 1.1% |
| Operating earnings | 501 | 554 | 53 10.6% |
| Operating margins | 10.3% | 11.2% |  |

### Operating Results

Revenues increased in the Marine Systems group in the third quarter and first nine months of 2012 compared with the prior-year periods. The increase consisted of the following:

|  | Third Quarter | Nine Months |
| --- | ---: | ---: |
| Navy ship construction | $(73) | $(146) |
| Navy ship engineering, repair and other services | 122 | 201 |
| Total increase | $49 | $55 |

The group’s U.S. Navy ship-construction programs include Virginia-class submarines, DDG-1000 and DDG-51 destroyers, and T-AKE combat-logistics and Mobile Landing Platform (MLP) auxiliary support ships. Revenues were down on the Virginia-class submarine program in the third quarter and first nine months of 2012 compared with the prior-year periods due to timing as the group transitions from the Block II to the Block III contract. Deliveries of the remaining nine Virginia-class submarines under contract are scheduled through 2018, and the Navy has requested proposals for the next block of submarines under the program expected to be awarded in the second half of 2013.

Revenues were up on the DDG-1000 and DDG-51 destroyer programs in the third quarter and first nine months of 2012. Deliveries of the three DDG-1000 ships under contract are scheduled for 2014, 2015 and 2018. Two destroyers awarded under the Navy’s restart of the DDG-51 program, including one awarded in the first quarter of 2012, are scheduled for delivery in 2016 and 2017, respectively. In the third quarter of 2012, we submitted a bid for a multi-ship, multi-year DDG-51 contract expected to be awarded in the first half of 2013.

Volume increased on the MLP program in 2012 as the group continued construction on the first ship and began construction of the second ship. The group was awarded a construction contract for the third MLP ship in the first quarter of 2012. Delivery of one ship per year is scheduled beginning in 2013. Additionally, the Navy's long-term shipbuilding plan includes a fourth MLP ship. On the group’s T-AKE program, activity was down in 2012 as the program nears completion. The 13th ship was delivered in the second quarter of 2012 and the 14th and final ship was delivered in October.

Revenues were up on engineering and repair programs for the Navy in 2012. The increase in revenues was driven by the acquisition of two East Coast surface-ship repair operations and higher volume on the Ohio-class replacement engineering program.

Growth in operating earnings outpaced revenues, resulting in a 40- and 90-basis point increase in operating margin in the third quarter and the first nine months of 2012, respectively, compared with the prior-year periods. This margin improvement was primarily due to increases in the T-AKE profit rate as the mature program continues to experience favorable cost performance.

### Outlook

We expect the Marine Systems group’s 2012 revenues to decrease slightly from 2011. Given strong performance in the first nine months of the year, operating margins are expected to be in the mid-11 percent range in 2012.

### INFORMATION SYSTEMS AND TECHNOLOGY

| Three Months Ended | October 2, 2011 | September 30, 2012 | Variance |
| --- | ---: | ---: | ---: |
| Revenues | $2,680 | $2,472 | $(208) (7.8)% |
| Operating earnings | 310 | 201 | (109) (35.2)% |
| Operating margins | 11.6% | 8.1% |  |
| Nine Months Ended | October 2, 2011 | **September 30, 2012** | Variance |
| Revenues | $8,300 | $7,440 | $(860) (10.4)% |
| Operating earnings | 885 | 645 | (240) (27.1)% |
| Operating margins | 10.7% | 8.7% |  |

### Operating Results

The Information Systems and Technology group’s revenues decreased in the third quarter and first nine months of 2012 compared with the prior-year periods. The decrease consisted of the following:

|  | Third Quarter | Nine Months |
| --- | ---: | ---: |
| Tactical communication systems | $(225) | $(810) |
| Information technology (IT) services | 25 | 27 |
| Intelligence, surveillance and reconnaissance (ISR) systems | (8) | (77) |
| Total decrease | $(208) | $(860) |

The decrease in revenues in the tactical communication systems business was driven by protracted U.S. customer acquisition cycles and a slower than expected transition to follow-on work on several contracts. This resulted in lower revenues in 2012 on key programs, including Warfighter Information Network – Tactical (WIN-T) and Common Hardware Systems (CHS), and for encryption and ruggedized hardware products. In addition, approximately 10% of the decline in the group’s revenues in both periods was due to lower volume on the U.K.-based Bowman communications system program, which has been successfully fielded and has now moved into maintenance and long-term support.

In the group’s IT services business, revenues were higher in the third quarter and first nine months of 2012 compared with the prior-year periods. Decreased volume on several completed large-scale IT infrastructure and support programs for the intelligence community and the Department of Defense, including the New Campus East and Walter Reed National Military Medical Center programs, was more than offset by revenues from the 2011 acquisition of Vangent, Inc.

Revenues were down in 2012 compared with the prior-year periods in the group’s ISR business primarily due to lower optical products sales. Demand for optical products continues to be negatively impacted by pressured defense budgets and the economic downturn. We anticipate orders in the fourth quarter that will stabilize production volume in the optical products business. However, if these awards are delayed or are for lower quantities than expected, it would impact the business' projected operating results and, therefore, may require the review of related long-lived assets for possible impairment, including specifically identified intangible assets of $125 and property, plant and equipment of $20.

In addition to the decrease in the group’s 2012 operating earnings due to volume, operating margins decreased 350 basis points in the third quarter and 200 basis points in the first nine months of 2012 compared with the prior-year periods. This decrease was driven primarily by a shift in the mix of the group’s revenues to lower-margin IT services, which increased from approximately 40 to 45 percent of the group’s total revenues in both periods. Contributing to this shift has been lower demand for encryption products and ruggedized hardware in our tactical communications business over the past year. Consequently, in the third quarter of 2012, we announced that we will cease production of several of these ruggedized hardware products. In addition, the group reduced the value of its existing ruggedized hardware inventory by $25 based on the anticipated remaining demand for these products. If orders do not materialize as expected, we may experience further inventory reductions.

### Outlook

We expect 2012 revenues in the Information Systems and Technology group to be down 8 to 9 percent from 2011 due to continued award delays and lower demand in our tactical communication systems business. Given operating results in the first nine months of the year, the group’s operating margins are expected to approximate 9 percent in 2012.

### CORPORATE

Corporate results consist primarily of compensation expense for stock options. Corporate operating costs totaled $17 in the third quarter of 2012 compared with $21 in the third quarter of 2011 and $52 in the first nine months of 2012 compared with $61 in the 2011 period. We expect 2012 full-year Corporate operating costs of approximately $70.

### BACKLOG

Our total backlog, including funded and unfunded portions, was $51.5 billion on September 30, 2012, compared with $52.4 billion at the end of the second quarter of 2012. Our estimated potential contract value includes our assessment of the ultimate value we expect to be awarded under unfunded indefinite delivery, indefinite quantity (IDIQ) contracts or unexercised options associated with existing firm contracts. At the end of the third quarter of 2012, our estimate of this potential contract value was $26.1 billion, compared with $26.2 billion at the end of the second quarter.

The following table details the backlog and the total estimated contract value of each business group at the end of the second and third quarters of 2012:

|  | Funded July 1, 2012 | Unfunded | Total Backlog | Estimated Potential Contract Value | Total Estimated Contract Value |
| --- | ---: | ---: | ---: | ---: | ---: |
| Aerospace | $16,058 | $241 | $16,299 | $— | $16,299 |
| Combat Systems | 8,854 | 905 | 9,759 | 3,090 | 12,849 |
| Marine Systems | 11,666 | 5,339 | 17,005 | 1,377 | 18,382 |
| Information Systems and Technology | 7,348 | 1,951 | 9,299 | 21,774 | 31,073 |
| Total | $43,926 | $8,436 | $52,362 | $26,241 | $78,603 |
|  | **September 30, 2012** |  |  |  |  |
| Aerospace | $15,827 | $215 | $16,042 | $— | $16,042 |
| Combat Systems | 8,259 | 1,101 | 9,360 | 2,627 | 11,987 |
| Marine Systems | 10,909 | 5,036 | 15,945 | 1,382 | 17,327 |
| Information Systems and Technology | 8,224 | 1,887 | 10,111 | 22,052 | 32,163 |
| Total | $43,219 | $8,239 | $51,458 | $26,061 | $77,519 |

### AEROSPACE

Aerospace funded backlog represents aircraft orders for which we have definitive purchase contracts and deposits from customers. Funded backlog includes the group’s newest aircraft models, the G280 and G650, which each received type certification from the FAA in the third quarter of 2012. Aerospace unfunded backlog consists of agreements to provide future aircraft maintenance and support services.

The group ended the third quarter of 2012 with $16 billion of backlog, down from $16.3 billion at the end of the second quarter as we deliver on our G650 backlog. Order activity included demand for products across our portfolio. Orders were up from the first and second quarters of 2012. Consistent with our expectations, we received several North American multi-aircraft orders we had anticipated in the first half of 2012. Customer defaults remain at the lowest level in four years. In the group’s large-cabin segment, backlog remains well-positioned with an approximate 18-month period between customer order and delivery of in-service aircraft and approximately five years of backlog for the G650.

Approximately 60 percent of the group’s orders in the first nine months of 2012 were from North American customers, with strong demand from Fortune 500 companies. While the installed base of aircraft is predominantly in North America, international customers represented nearly 60 percent of the group’s backlog at the end of the third quarter.

### DEFENSE GROUPS

The total backlog for our defense groups represents the estimated remaining sales value of work to be performed under firm contracts. The funded portion of this backlog includes items that have been authorized and appropriated by the Congress and funded by the customer, as well as commitments by international customers that are similarly approved and funded by their governments. While there is no guarantee that future budgets and appropriations will provide funding for a given program, we have included only firm contracts at the amounts we believe are likely to receive funding.

Total backlog in our defense groups was $35.4 billion on September 30, 2012, down 2 percent from the second quarter. Backlog increased in our Information Systems and Technology group, which booked the highest amount of orders since the second quarter of 2010, including several significant contract awards on major programs. Backlog decreased in our Marine Systems group, which typically has significant variations in quarterly order intake. The Combat Systems group anticipates several notable contract awards in the fourth quarter of 2012 or early 2013.

Our defense groups each received notable contract awards in the quarter.

Combat Systems awards included the following:

- $395 from the U.S. Army to begin engineering development efforts for the Abrams main battle tank modernization program.
- $135 from the Canadian government to supply various calibers of ammunition.
- $50 from the Army to produce M31A2 propellant.

Marine Systems awards included the following:

- $105 from the U.S. Navy to renovate and modernize the dock landing ship USS Comstock (LSD 45).
- $95 from the Navy for advance planning and preliminary execution of fire-restoration efforts on USS Miami (SSN 755).

Information Systems and Technology awards included the following:

- $340 from the Army under the Warfighter Information Network-Tactical (WIN-T) program for Increment 2 equipment production.
- $265 for wireless network systems and support from several commercial customers.
- $95 from the Army for ruggedized computing equipment under the Common Hardware Systems-4 (CHS-4) program.
- $85 from the U.S. Air Force for networking and computing products and support under the Network-Centric Solutions (NETCENTS) program.
- $80 from the U.S. Department of State to provide supply chain management services. The program has a maximum potential value of $1.2 billion over 5 years.
- $75 from the Army under the WIN-T program for Increment 1 technical support services and upgrades.
- $70 from the Army for production of over 13,000 Rifleman radios and accessory kits under the Joint Tactical Radio System (JTRS) Handheld, Manpack and Small Form-Fit (HMS) program.
- $65 for the Army's Warfighter Field Operations Customer Support (FOCUS) program to provide support for live, virtual and constructive training operations.
- $65 to supply 64 radio-telescope antennas for South Africa's MeerKAT radio telescope program.

### FINANCIAL CONDITION, LIQUIDITY AND CAPITAL RESOURCES

We ended the third quarter of 2012 with a cash balance of $2.9 billion, up $225 from the end of 2011. Our net debt, defined as debt less cash and equivalents and marketable securities, was $874 at the end of the third quarter of 2012, down $159 from the end of 2011. Following is a discussion of the major components of our operating, investing and financing activities, as classified on the Consolidated Statement of Cash Flows, in the first nine months of 2011 and 2012.

### OPERATING ACTIVITIES

We generated cash from operating activities of $1.9 billion in the first nine months of 2012 compared with $1.2 billion in the same period in 2011. The primary driver of cash flows in both periods was net earnings. Contributions to our pension plans, which were approximately $430 in the first nine months of 2012 compared with $300 in the prior-year period, also impacted cash from operating activities.

As discussed further in Note K to the unaudited Consolidated Financial Statements, litigation on the A-12 program termination has been ongoing since 1991. If, contrary to our expectations, the default termination ultimately is sustained and the government prevails on its recovery theories, we, along with The Boeing Company, could collectively be required to repay the U.S. government as much as $1.4 billion for progress payments received for the A-12 contract, plus interest, which was approximately $1.6 billion on September 30, 2012. If this were the outcome, we would owe half of the total, or approximately $1.5 billion pretax. Our after-tax cash obligation would be approximately $740. We believe we have sufficient resources, including access to capital markets, to pay such an obligation, if required.

### INVESTING ACTIVITIES

We used $668 for investing activities in the first nine months of 2012 compared with $1.5 billion in the same period in 2011. The primary uses of cash for investing activities were acquisitions, capital expenditures and purchases of marketable securities.

We completed six acquisitions for $426 in the first nine months of 2012 and four acquisitions for $1.1 billion in the first nine months of 2011. We used cash on hand to fund these acquisitions. See Note B to the unaudited Consolidated Financial Statements for further discussion of acquisition activity.

We expect full-year capital expenditures to be up slightly from 2011 largely due to Gulfstream’s $500 seven-year Savannah, Georgia, facilities expansion project started in 2010.

Our investments in available-for-sale and held-to-maturity securities are focused on ensuring financial flexibility to deploy cash resources. To bolster liquidity in the uncertain business environment caused by the continuing resolution and the looming sequester mechanism, we received cash of $42 from the net sales and maturities of these securities in the first nine months of 2012, including $211 from the sale of held-to-maturity securities.

In 2011, investing activities also included proceeds from the second quarter sale of the detections systems portion of the weapons systems business in our Combat Systems group.

### FINANCING ACTIVITIES

Net cash used for financing activities was $1 billion in the nine-month period ended September 30, 2012, compared with $826 in the same period in 2011. Our financing activities include payment of dividends and repurchases of common stock. Net cash from financing activities also includes proceeds received from stock options exercises.

We had no commercial paper outstanding on September 30, 2012. We have $2 billion in bank credit facilities that remain available. These facilities provide backup liquidity to our commercial paper program. We also have an effective shelf registration on file with the Securities and Exchange Commission. The next material repayment of long-term debt is $1 billion of fixed-rate notes scheduled to mature in May 2013. We are evaluating current market conditions and various alternatives with respect to outstanding debt, including issuing debt to redeem one or more series of our existing fixed-rate notes. See Note G to the unaudited Consolidated Financial Statements for additional information regarding our debt obligations, including scheduled debt maturities.

On March 7, 2012, our board of directors declared an increased quarterly dividend of $0.51 per share – the 15th consecutive annual increase. The board had increased the quarterly dividend to $0.47 per share in March 2011.

In the first nine months of 2012, we repurchased 9.1 million of our outstanding shares on the open market at an average price of $66 per share. In the first nine months of 2011, we repurchased 20 million shares at an average price of $69 per share. On September 30, 2012, approximately 10.9 million shares remain authorized by our board of directors for repurchase – about 3 percent of our total shares outstanding.

### NON-GAAP MANAGEMENT METRICS – FREE CASH FLOW

Our free cash flow from operations for the first nine months of 2012 was $1.6 billion, or 90 percent of earnings from continuing operations, compared with $943 and 48 percent for the same period in 2011. We define free cash flow from operations as net cash provided by operating activities less capital expenditures. We believe free cash flow from operations is a useful measure for investors because it portrays our ability to generate cash from our core businesses for purposes such as repaying maturing debt, funding business acquisitions, repurchasing our common stock and paying dividends. We use free cash flow from operations to assess the quality of our earnings and as a performance measure in evaluating management of the business.

The following table reconciles the free cash flow from operations with net cash provided by operating activities, as classified on the unaudited Consolidated Statements of Cash Flows:

| Nine Months Ended | October 2, 2011 | September 30, 2012 |
| --- | ---: | ---: |
| Net cash provided by operating activities | $1,216 | $1,907 |
| Capital expenditures | (273) | (286) |
| Free cash flow from operations | $943 | $1,621 |
| Cash flows as a percentage of earnings from continuing operations: |  |  |
| Net cash provided by operating activities | 62% | 106% |
| Free cash flow from operations | 48% | 90% |

41

We expect to continue to generate funds in excess of our short- and long-term liquidity needs. We believe we have adequate funds on hand and sufficient borrowing capacity to execute our financial and operating strategy.

### ADDITIONAL FINANCIAL INFORMATION

### ENVIRONMENTAL MATTERS AND OTHER CONTINGENCIES

For a discussion of environmental matters and other contingencies, see Note K to the unaudited Consolidated Financial Statements. We do not expect our aggregate liability with respect to these matters to have a material impact on our results of operations, financial condition or cash flows.

### APPLICATION OF CRITICAL ACCOUNTING POLICIES

Management’s Discussion and Analysis of Financial Condition and Results of Operations is based on our unaudited Consolidated Financial Statements, which have been prepared in accordance with U.S. generally accepted accounting principles (GAAP). The preparation of financial statements in accordance with GAAP requires that we make estimates and assumptions that affect the reported amounts of assets and liabilities and the disclosure of contingent assets and liabilities at the date of the financial statements, as well as the reported amounts of revenues and expenses during the reporting period.

Accounting for long-term contracts and programs involves the use of various techniques to estimate total contract revenues and costs. Contract estimates are based on various assumptions that project the outcome of future events that often span several years. We review our performance monthly and update our contract estimates at least annually and often quarterly as well as when required by specific events and circumstances. We recognize changes in estimated profit on contracts under the reallocation method. Under this method, the impact of revisions in estimates is recognized prospectively over the remaining contract term. The net increase in our operating earnings (and earnings per share) from the quarterly impact of revisions in contract estimates totaled $113 ($0.22) and $299 ($0.56) for the three- and nine-months periods ended October 2, 2011, including the revision in estimate on the Marine Systems’ T-AKE contract discussed in the second quarter of 2011. The net increase in our operating earnings (and earnings per share) totaled $45 ($0.09) and $203 ($0.39) for the three- and nine-months periods ended September 30, 2012, respectively. No revisions on any one contract were material to our unaudited Consolidated Financial Statements in the first nine months of 2012.

Other significant estimates include those related to goodwill and other intangible assets, income taxes, pensions and other post-retirement benefits, workers’ compensation, warranty obligations and contingencies and litigation. We make our best estimates based on historical and current experience and on various assumptions that we believe to be reasonable under the circumstances. The results of these estimates form the basis for making judgments about the carrying values of assets and liabilities that are not readily available from other sources. Actual results may differ from these estimates.

We will complete our required annual goodwill impairment test during the fourth quarter of 2012. Current uncertainties in the defense business environment, including slowed spending and the threat of sequestration, may impact the fair value of our reporting units. Given recent operating trends, we believe the reporting unit which most likely could be impacted is Information Systems and Technology.

We believe that our judgment is applied consistently and produces financial information that fairly depicts the results of operations for all periods presented. For a full discussion of our critical accounting policies, see our Annual Report on Form 10-K for the year ended December 31, 2011.

## Market risk

As filed, 162 characters.

There have been no material changes with respect to this item from the disclosure included in our Annual Report on Form 10-K for the year ended December 31, 2011.

## Controls and procedures

As filed, 3,368 characters.

Our management, under the supervision and with the participation of the Chief Executive Officer and the Chief Financial Officer, evaluated the effectiveness of our disclosure controls and procedures (as defined in Rule 13a-15(e) and Rule 15d-15(e) under the Securities Exchange Act of 1934, as amended) on September 30, 2012. Based on this evaluation, the Chief Executive Officer and Chief Financial Officer concluded that, on September 30, 2012, our disclosure controls and procedures were effective.

There were no changes in our internal control over financial reporting that occurred during the quarter ended September 30, 2012, that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.

### FORWARD-LOOKING STATEMENTS

This quarterly report on Form 10-Q contains forward-looking statements that are based on management’s expectations, estimates, projections and assumptions. Words such as “expects,” “anticipates,” “plans,” “believes,” “scheduled,” “outlook,” “should,” “estimates” and variations of these words and similar expressions are intended to identify forward-looking statements. These include but are not limited to projections of revenues, earnings, operating margins, segment performance, cash flows, contract awards, aircraft production, deliveries and backlog. Forward-looking statements are made pursuant to the safe harbor provisions of the Private Securities Litigation Reform Act of 1995, as amended. These statements are not guarantees of future performance and involve certain risks and uncertainties that are difficult to predict. Therefore, actual future results and trends may differ materially from what is forecast in forward-looking statements due to a variety of factors, including the risk factors discussed in Item 1A of our Annual Report on Form 10-K. These factors include, without limitation:

- general U.S. and international political and economic conditions;
- decreases in U.S. government defense spending or changing priorities within the defense budget and the impacts of the Budget Control Act of 2011;
- termination or restructuring of government contracts due to unilateral government action;
- differences in anticipated and actual program performance, including the ability to perform under long-term fixed-price contracts within estimated costs, and performance issues with key suppliers and subcontractors;
- expected recovery on contract claims and requests for equitable adjustment;
- changing customer demand or preferences for business aircraft, including the effects of economic conditions on the business-aircraft market;
- potential for changing prices for energy and raw materials; and
- the status or outcome of legal and/or regulatory proceedings.

All forward-looking statements speak only as of the date of this report or, in the case of any document incorporated by reference, the date of that document. All subsequent written and oral forward-looking statements attributable to the company or any person acting on the company’s behalf are qualified by the cautionary statements in this section. We do not undertake any obligation to update or publicly release any revisions to forward-looking statements to reflect events, circumstances or changes in expectations after the date of this report except as expressly required to do so by law.

## Risk factors

As filed, 1,996 characters.

Other than the revision to the following risk factor concerning risks relating to the U.S. government’s defense budget, we do not believe there are any material changes to the risk factors included in our Annual Report on Form 10-K for the year ended December 31, 2011.

**We depend on the U.S. government for a significant portion of our revenues.** More than two-thirds of our revenues are from the U.S. government. U.S. defense spending has been driven by perceived threats to national security. While the country has been under an elevated threat level for the past decade, competing demands for federal funds could pressure all areas of spending. A decrease in U.S. government defense spending or changes in spending allocation could result in one or more of our programs being reduced, delayed or terminated, which would impact our financial performance.

The Budget Control Act of 2011 has two primary parts that affect future defense spending. The first part mandates a $487 billion reduction to previously-planned defense spending over the next decade. These cuts are incorporated in the fiscal year (FY) 2013 proposed defense budget. The second part is a sequester mechanism that would impose an additional $500 billion of cuts on defense spending between FY 2013 and FY 2021 if the Congress does not identify a means to reduce the U.S. deficit by $1.2 trillion by year end. As of October 30, 2012, the means have not been identified by Congress. Given the uncertainty regarding how the Congress will reduce the U.S. deficit and a lack of specifics on how cuts will be implemented, we are unable to predict the impact, which could be material, on our programs or financial outlook, including our revenues, operating earnings and margins, cash flow, orders and backlog and recovery of long-lived assets. However, funding reductions of the magnitude imposed by the sequester mechanism as written could have material operational consequences to our employee base, facilities and suppliers.

Filed Oct 30, 2012.
Source: SEC EDGAR, the filing index for accession 0000040533-12-000007. Last ingested by Listed: Nov 14, 2026, 20:26 ET. No prices; not investment advice.