## Figures reported in this filing

Standardized XBRL line items for the period ended 2024-12-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Operating income | 12 months, 2024-01-01 to 2024-12-31 | $2.39bn | us-gaap:OperatingIncomeLoss |
| Interest expense | 12 months, 2024-01-01 to 2024-12-31 | $1.25bn | us-gaap:InterestExpense |
| Income tax | 12 months, 2024-01-01 to 2024-12-31 | −$402.0m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 12 months, 2024-01-01 to 2024-12-31 | $1.94bn | us-gaap:NetIncomeLoss |
| Diluted EPS | 12 months, 2024-01-01 to 2024-12-31 | $3.44 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 12 months, 2024-01-01 to 2024-12-31 | $3.44 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 12 months, 2024-01-01 to 2024-12-31 | 563,000,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 12 months, 2024-01-01 to 2024-12-31 | $4.64bn | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 12 months, 2024-01-01 to 2024-12-31 | $7.36bn | us-gaap:PaymentsToAcquireProductiveAssets |
| Dividends paid | 12 months, 2024-01-01 to 2024-12-31 | $1.18bn | us-gaap:PaymentsOfDividends |
| Current assets | at 2024-12-31 | $4.33bn | us-gaap:AssetsCurrent |
| Total assets | at 2024-12-31 | $70.03bn | us-gaap:Assets |
| Current liabilities | at 2024-12-31 | $6.46bn | us-gaap:LiabilitiesCurrent |
| Short-term borrowings | at 2024-12-31 | $695.0m | us-gaap:ShortTermBorrowings |
| Shareholders' equity | at 2024-12-31 | $19.52bn | us-gaap:StockholdersEquity |

## Business

As filed, 55,103 characters.

### Definitions of Abbreviations

| Xcel Energy Inc.’s Subsidiaries and Affiliates (current and former) |  |
| --- | --- |
| Capital Services | Capital Services, LLC |
| Eloigne | Eloigne Company |
| e prime | e prime inc. |
| Nicollet Project Holdings | Nicollet Project Holdings, LLC |
| NSP-Minnesota | Northern States Power Company, a Minnesota corporation |
| NSP System | The electric production and transmission system of NSP-Minnesota and NSP-Wisconsin operated on an integrated basis and managed by NSP-Minnesota |
| NSP-Wisconsin | Northern States Power Company, a Wisconsin corporation |
| PSCo | Public Service Company of Colorado |
| SPS | Southwestern Public Service Co. |
| Utility subsidiaries | NSP-Minnesota, NSP-Wisconsin, PSCo and SPS |
| WGI | WestGas InterState, Inc. |
| WYCO | WYCO Development, LLC |
| Xcel Energy | Xcel Energy Inc. and its subsidiaries |

| Federal and State Regulatory Agencies |  |
| --- | --- |
| CPUC | Colorado Public Utilities Commission |
| DOC | Minnesota Department of Commerce |
| DOE | United States Department of Energy |
| DOT | United States Department of Transportation |
| EPA | United States Environmental Protection Agency |
| ERCOT | Electric Reliability Council of Texas |
| FASB | Financial accounting standards board |
| FERC | Federal Energy Regulatory Commission |
| IRS | Internal Revenue Service |
| MPUC | Minnesota Public Utilities Commission |
| MPSC | Michigan Public Service Commission |
| NDPSC | North Dakota Public Service Commission |
| NERC | North American Electric Reliability Corporation |
| NIST | National Institute of Standards and Technology |
| NMPRC | New Mexico Public Regulation Commission |
| NRC | Nuclear Regulatory Commission |
| OAG | Minnesota Office of Attorney General |
| PHMSA | Pipeline and Hazardous Materials Safety Administration |
| PSCW | Public Service Commission of Wisconsin |
| PUCT | Public Utility Commission of Texas |
| SDPUC | South Dakota Public Utility Commission |
| SEC | Securities and Exchange Commission |

| Electric, Purchased Gas and Resource Adjustment Clauses |  |
| --- | --- |
| CIP | Conservation improvement program |
| DSM | Demand side management |
| FCA | Fuel clause adjustment |
| GCA | Gas cost adjustment |
| RES | Renewable energy standard |

| Other |  |
| --- | --- |
| ADIT | Accumulated deferred income taxes |
| AFUDC | Allowance for funds used during construction |
| ALJ | Administrative law judge |
| ARO | Asset retirement obligation |
| ARRR | Application for rehearing, reargument or reconsideration |
| ASC | Financial Accounting Standards Board Accounting Standards Codification |
| ASU | Accounting standards update |
| ATM | At-the-market |
| C&I | Commercial and industrial |

|  |  |
| --- | --- |
| CapX2020 | Alliance of electric cooperatives, municipals and investor-owned utilities in the upper Midwest involved in a joint transmission line planning and construction effort |
| CCR | Coal combustion residuals |
| CCR Rule | Final rule (40 CFR 257.50 - 257.107) published by the EPA regulating the management, storage and disposal of CCRs as a nonhazardous waste |
| CDD | Cooling degree-days |
| CEO | Chief executive officer |
| CERCLA | Comprehensive Environmental Response, Compensation, and Liability Act |
| CFO | Chief financial officer |
| CIG | Colorado Interstate Gas Company, LLC |
| CON | Certificate of need |
| CO2 | Carbon dioxide |
| CORE | CORE Electric Cooperative |
| CPCN | Certificate of public convenience and necessity |
| CSPV | Crystalline silicon photovoltaic |
| CWIP | Construction work in progress |
| DECON | Decommissioning method where radioactive contamination is removed and safely disposed of at a requisite facility or decontaminated to a permitted level |
| DRIP | Dividend Reinvestment Program |
| EEI | Edison Electric Institute |
| EMANI | European Mutual Association for Nuclear Insurance |
| EPS | Earnings per share |
| ETR | Effective tax rate |
| FTR | Financial transmission right |
| GAAP | Generally accepted accounting principles |
| GE | General Electric |
| GHG | Greenhouse gas |
| HDD | Heating degree-days |
| INPO | Institute of Nuclear Power Operations |
| IRA | Inflation Reduction Act |
| IPP | Independent power producing entity |
| IRP | Integrated resource plan |
| ISO | Independent system operator |
| ITC | Investment tax credit |
| LP&L | Lubbock Power & Light |
| MGP | Manufactured gas plant |
| MISO | Midcontinent Independent System Operator, Inc. |
| Native load | Demand of retail and wholesale customers that a utility has an obligation to serve under statute or contract |
| NAV | Net asset value |
| NEIL | Nuclear Electric Insurance Ltd. |
| NOL | Net operating loss |
| NOx | Nitrogen oxides |
| O&M | Operating and maintenance |
| ONES | Operations, Nuclear, Environmental and Safety |
| PFAS | Per- and polyfluoroalkyl substances |
| PIM | Performance incentive mechanism |
| Post-65 | Post-Medicare |
| PPA | Power purchase agreement |
| Pre-65 | Pre-Medicare |
| PSPS | Public safety power shutoff |
| PTC | Production tax credit |
| RDF | Refuse-derived fuel |
| REC | Renewable energy credit |

3

|  |  |
| --- | --- |
| RFP | Request for proposal |
| ROE | Return on equity |
| ROU | Right-of-use |
| RTO | Regional transmission organization |
| S&P | Standard & Poor’s Global Ratings |
| SERP | Supplemental executive retirement plan |
| SMMPA | Southern Minnesota Municipal Power Agency |
| SPP | Southwest Power Pool, Inc. |
| SRP | System resiliency plan |
| TCJA | 2017 federal tax reform enacted as Public Law No: 115-97, commonly referred to as the Tax Cuts and Jobs Act |
| THI | Temperature-humidity index |
| TSR | Total shareholder return |
| VaR | Value at risk |
| VIE | Variable interest entity |
| WACC | Weighted average cost of capital |
| WMP | Wildfire mitigation plan |

| Measurements |  |
| --- | --- |
| Bcf | Billion cubic feet |
| KV | Kilovolts |
| KWh | Kilowatt hours |
| MMBtu | Million British thermal units |
| MW | Megawatts |
| MWh | Megawatt hours |

### Where to Find More Information

Xcel Energy’s website address is www.xcelenergy.com. Xcel Energy makes available through its website, free of charge, its annual report on Form 10-K, quarterly reports on Form 10-Q, current reports on Form 8-K and all amendments to those reports filed or furnished pursuant to Section 13(a) or 15(d) of the Securities Exchange Act of 1934 as soon as reasonably practicable after the reports are electronically filed with or furnished to the SEC.

The SEC maintains an internet site that contains reports, proxy and information statements, and other information regarding issuers that file electronically at http://www.sec.gov. The information on Xcel Energy’s website is not a part of, or incorporated by reference in, this annual report on Form 10-K. Xcel Energy intends to make future announcements regarding Company developments and financial performance through its website, www.xcelenergy.com, as well as through press releases, filings with the SEC, conference calls and webcasts.

### Forward-Looking Statements

Except for the historical statements contained in this report, the matters discussed herein are forward-looking statements that are subject to certain risks, uncertainties and assumptions. Such forward-looking statements, including those relating to 2025 EPS guidance, long-term EPS and dividend growth rate objectives, future sales, future expenses, future tax rates, future operating performance, estimated base capital expenditures and financing plans, projected capital additions and forecasted annual revenue requirements with respect to rider filings, expected rate increases to customers, expectations and intentions regarding regulatory proceedings, expected pension contributions and expected impact on our results of operations, financial condition and cash flows of interest rate changes, increased credit exposure, and legal proceeding outcomes, as well as assumptions and other statements are intended to be identified in this document by the words “anticipate,” “believe,” “could,” “estimate,” “expect,” “intend,” “may,” “objective,” “outlook,” “plan,” “project,” “possible,” “potential,” “should,” “will,” “would” and similar expressions. Actual results may vary materially. Forward-looking statements speak only as of the date they are made, and we expressly disclaim any obligation to update any forward-looking information. The following factors, in addition to those discussed elsewhere in this Annual Report on Form 10-K for the fiscal year ended Dec. 31, 2024 (including risk factors listed from time to time by Xcel Energy Inc. in reports filed with the SEC, including “Risk Factors” in Item 1A of this Annual Report on Form 10-K), could cause actual results to differ materially from management expectations as suggested by such forward-looking information: operational safety, including our nuclear generation facilities and other utility operations; successful long-term operational planning; commodity risks associated with energy markets and production; rising energy prices and fuel costs; qualified employee workforce and third-party contractor factors; violations of our Codes of Conduct; our ability to recover costs and our subsidiaries’ ability to recover costs from customers; changes in regulation; reductions in our credit ratings and the cost of maintaining certain contractual relationships; general economic conditions, including recessionary conditions, inflation rates, monetary fluctuations, supply chain constraints and their impact on capital expenditures and/or the ability of Xcel Energy Inc. and its subsidiaries to obtain financing on favorable terms; availability or cost of capital; our customers’ and counterparties’ ability to pay their debts to us; assumptions and costs relating to funding our employee benefit plans and health care benefits; our subsidiaries’ ability to make dividend payments; tax laws; uncertainty regarding epidemics; effects of geopolitical events, including war and acts of terrorism; cybersecurity threats and data security breaches; seasonal weather patterns; changes in environmental laws and regulations; climate change and other weather events; natural disaster and resource depletion, including compliance with any accompanying legislative and regulatory changes; costs of potential regulatory penalties and wildfire damages in excess of liability insurance coverage; regulatory changes and/or limitations related to the use of natural gas as an energy source; challenging labor market conditions and our ability to attract and retain a qualified workforce; and our ability to execute on our strategies or achieve expectations related to environmental, social and governance matters including as a result of evolving legal, regulatory and other standards, processes, and assumptions, the pace of scientific and technological developments, increased costs, the availability of requisite financing, and changes in carbon markets.

### Overview

Xcel Energy (the “Company”) is a major U.S. regulated electric and natural gas delivery company headquartered in Minneapolis, Minnesota (incorporated in Minnesota in 1909). The Company serves customers in eight states, including portions of Colorado, Michigan, Minnesota, New Mexico, North Dakota, South Dakota, Texas and Wisconsin. Xcel Energy provides a comprehensive portfolio of energy-related products and services to approximately 3.9 million electric customers and 2.2 million natural gas customers through four utility subsidiaries (NSP-Minnesota, NSP-Wisconsin, PSCo and SPS). Along with the utility subsidiaries, the transmission-only subsidiaries, WYCO (a joint venture formed with CIG to develop and lease natural gas pipelines, storage and compression facilities) and WGI (an interstate natural gas pipeline company) comprise the regulated utility operations. The Company’s nonregulated subsidiaries include Eloigne, Capital Services, Venture Holdings and Nicollet Project Holdings.

| Subsidiary / Affiliate | Function |
| --- | --- |
| NSP-Minnesota | Electric & Gas |
| NSP-Wisconsin | Electric & Gas |
| PSCo | Electric & Gas |
| SPS | Electric |
| WGI | Interstate gas pipeline |
| WYCO | Gas storage and transportation |
| Other Subsidiaries | See Note 1 to the consolidated financial statements for further information. |

| Utility Subsidiary Overview |  |
| --- | --- |
| Electric customers | 3.9 million |
| Natural gas customers | 2.2 million |
| Total assets | $70 billion |
| Electric generating capacity (owned) | 20,426 MW |
| Natural gas storage capacity | 53.3 Bcf |
| Electric transmission lines (conductor miles) | 111,000 miles |
| Electric distribution lines (conductor miles) | 221,000 miles |
| Natural gas transmission lines | 2,100 miles |
| Natural gas distribution lines | 38,000 miles |

### Service Territory

### Strategy

Xcel Energy’s vision is to be the preferred and trusted provider of the energy our customers need. We will deliver on this vision while offering a competitive total return to our shareholders. Our mission is to make energy work better for our customers, helping them thrive every day.

We execute on our vision and mission through three strategic priorities.

| OUR CUSTOMERS | OUR PEOPLE | OUR PERFORMANCE |
| --- | --- | --- |
| Enhance their experience with Xcel Energy and keep their bills as low as possible | Provide a rewarding employee experience, with development, engagement and growth | Deliver excellent operational, financial and clean energy performance |

Our employees are guided by four corporate values: Connected, Committed, Safe and Trustworthy.

Our values, culture and Code of Conduct serve as the foundation upon which Xcel Energy’s employees, Board of Directors, contractors and suppliers approach their work in delivering on our three strategic priorities.

### OUR CUSTOMERS

Xcel Energy has invested more than $2 billion over the past decade in a portfolio of renewable and conservation programs that provide customers with clean energy options and help keep bills low. New demand remains robust in our territories, including load growth from new data centers, industrial electrification and electric vehicle adoption. As such, we are transforming and expanding our electric grid to accommodate load growth, renewable energy and distributed energy resources.

We are in the process of installing smart electric meters, which will deliver customer and operational benefits, providing near-real-time communication, allowing customers to know how much energy they are using and what it will cost. In addition, customers will have new digital tools to make it easier to access their energy information, gain useful insights to understand and manage their energy use and make energy choices that lower their bills.

Customer affordability is critical to successful strategy execution. Since 2020, our lean operating program has generated nearly $500 million of sustainable savings for our customers, while improving operating outcomes and reducing enterprise risk. At the same time, our Steel for Fuel strategy has saved customers nearly $5 billion since 2017 in avoided fuel costs and PTCs.

In turn, we delivered our electric and natural gas products in 2024 at a price that is lower than it was ten years ago on an inflation adjusted basis. Since 2014, our average residential electric bill growth has been 1.7% per year and natural gas bills have declined 0.6% per year on a nominal basis. Additionally, based on available EIA data, the five year average residential electric and natural gas bills for an Xcel Energy customer were 28% and 12% below the national average.

Going forward, our goal is to enable the clean energy transition while keeping long-term customer bill growth below the rate of inflation through initiatives including conservation programs, O&M cost control, our One Xcel Energy Way lean management initiative, advanced operational technologies and our Steel for Fuel program.

We provide a fundamental service, powering our communities with safe, reliable, competitively priced and increasingly clean energy.

Investing in our communities is important to our collective success. We initiated 24 economic development projects for our local communities in 2024, which are projected to create more than $5.1 billion in capital investments and nearly 3,200 jobs. Nearly 59% of our supply chain spend was local.

Approximately 280 employees served on more than 480 nonprofit organizations or local community boards, providing over 26,000 volunteer hours in 2024. Our annual Day of Service attracted 2,200 people who volunteered over 7,900 combined hours at over 110 nonprofit projects across the company’s service footprint.

In 2024, the Xcel Energy Foundation contributed $5 million to 390 nonprofit organizations that support its three charitable giving focus areas of STEM Career Pathways, Environmental Sustainability, and Community Vitality. Through our 2024 Power Your Purpose Giving Campaign, Xcel Energy employees, contractors and retirees donated more than $2 million to over 1,500 nonprofit and community organizations – exceeding our fundraising goal. Combined with the Xcel Energy Foundation match to local United Way chapters, this campaign raised $5 million for our communities.

### OUR PEOPLE

### Champion Safety

Continuously elevating the quality and safety of the workplace is a top priority. We are considered a benchmark company for our Safety Always approach, focused on eliminating life-altering injuries through a trusted, transparent culture and the use of critical controls. All employees have “stop work authority” and are expected to keep each other, our customers and the public safe. Employees are encouraged to speak up, share experiences and learn from events to help protect themselves, their coworkers and the public.

The Board of Directors has oversight for employee and public safety through the Operations, Nuclear, Environmental and Safety committee, both of which are also tied to annual incentive compensation.

### Cultivate an Inclusive, Best-in-Class Workforce

We aim to create an inclusive work culture where employees are empowered to create innovative solutions, where everyone is respected and there is a collective sense of belonging. We are building a workforce that reflects the broad range of backgrounds, experiences and perspectives within our communities and among our customers. This starts with our Board of Directors.

The Board of Directors oversees our workforce strategy, including our inclusion initiatives and employee safety and inclusion KPIs in our management annual incentive plan.

A total of 70% of annual incentive compensation was tied to safety, system reliability and inclusion metrics.

Management evaluates compensation and benefits to maintain a market-competitive, performance-based, shareholder-aligned total rewards package that supports our ability to attract, engage and retain a talented workforce.

We partner with educational and community organizations to recruit employees who reflect the communities we serve and live our values. Xcel Energy had 11,380 full-time employees and workforce demographics as of December 2024 were as follows:

|  | Female | Ethnically Diverse |
| --- | ---: | ---: |
| Board of Directors | 31% | 15% |
| CEO direct reports | 38 | 13 |
| Management | 25 | 13 |
| Employees | 23 | 18 |
| New hires | 40 | 28 |
| Interns (hired throughout 2024) | 42 | 40 |

Xcel Energy respects employees’ freedom of association and their right to collectively organize. As of Dec. 31, 2024, approximately 45% of our employees (5,087) were covered by collective bargaining agreements.

We are committed to the advancement and protection of human rights, consistent with U.S. human rights laws and the general principles in the International Labour Organization Conventions.

Annual Code of Conduct training is required for all employees and the Board of Directors. We do not tolerate Code of Conduct violations or other unacceptable behaviors. We expect and offer employees multiple avenues to raise concerns or report wrong-doing and do not permit any retaliation.

### OUR PERFORMANCE

### Deliver a Competitive Total Return to Investors

Successful strategy execution, along with our disciplined approach to growth, operations and management of environmental, social and governance issues, positions us to continue delivering a competitive TSR.

We have consistently achieved our financial objectives, meeting or exceeding our initial ongoing earnings guidance range for 20 consecutive years and delivering dividend growth for 22 consecutive years.

### Leading the Energy Clean Transition

Xcel Energy is committed to maintaining a safe and reliable electric and natural gas system, while leading the clean energy transition. Over the next five years, we plan to make $45 billion of capital investments to improve reliability, resiliency and sustainability. Significant investment in our transmission and distribution systems is essential to ensure resiliency and reliability for customers, we have approximately $28 billion in our 2025 - 2029 capital plan focused specifically on this.

Our sustainability commitments are summarized as follows:

See Item 1A for risks and uncertainties related to strategic and sustainability goals and objectives.

### Zero-Carbon Electricity by 2050

Xcel Energy’s operating footprint includes some of the best wind and solar resources in the country, providing for higher capacity factors and lower electricity costs.

Xcel Energy’s wind capacity is now over 11,000 MW, including nearly 4,500 MW of owned wind. In 2024, we completed Phase 1 of our Sherco Solar project in Minnesota. Once Phases 2 and 3 are completed in 2025 and 2026, Sherco Solar’s combined capacity of 710 MW will be one of the largest solar facilities in the country and provide enough clean energy to power 150,000 homes across the upper Midwest. We have 15,000 - 29,000 MW of investment opportunity, through new and extended generation, in development across our NSP, PSCo and SPS footprint. In our base 2025 - 2029 capital investment plan, we have 3,700 MW of new and repowered wind, solar, hybrid and battery storage resources included.

Through 2024, we reduced carbon emissions from generation serving customers by an estimated 57% (from 2005 levels) and remain on track to achieve 80% carbon reduction and fully exit coal by the end of 2030.

***Natural Gas Use in Buildings – Net-Zero GHG by 2050***

Recognizing externalities like the pace of technology development and customer needs, Xcel Energy updated certain interim goals on the path to achieve our 2050 goal to provide net-zero natural gas service from the supply, distribution and end-use natural gas. In 2024 and early 2025, we received approvals for our modified Clean Heat Plan in Colorado and Natural Gas Innovation Plan in Minnesota, which provide starting points for this transition.

Our net-zero natural gas frameworks include the following priorities:

- Operating a safe, reliable gas system with net-zero methane gas service by 2030.
- Optimize the energy system with electrification-first approaches for new growth by leading voluntary market transformation initiatives.
- Provide customers with a portfolio of solutions to choose from, including natural gas, while ensuring we meet requirements of our regulators.

### Electrification of the Transportation Sector

We are also helping reduce carbon emissions in other sectors, including transportation. Similar to our natural gas goals, we revised the interim goals to reflect market considerations for transportation to enable the charging infrastructure for 1.5 million electric vehicles across the areas we serve by 2035. By 2050, our vision remains to run all vehicles in our service area with carbon-free electricity or other clean energy. We have approved clean transportation programs and plans in Colorado, New Mexico, Minnesota and Wisconsin.

### Wildfire Resiliency and Mitigation

Protecting our customers and our system from the threats of extreme weather is a top priority for Xcel Energy. In 2024, we filed an updated Wildfire Mitigation Plan in Colorado and our Resiliency Plan in Texas that integrates industry experience, incorporates evolving risk assessment methodologies, adds new technology and expands the scope, pace and scale of our programs to reduce wildfire risk. We also issued wildfire mitigation plans for each of our other states in 2024.

In 2024, we implemented the capability to deliver enhanced, wildfire safety operations and conduct proactive public safety power shutoffs across our entire system. We accelerated pole inspections and replacements on our system and expanded visual coverage of high-risk areas with our PanoAI camera system. We also deployed Technosylva’s advanced risk modelling system enterprise-wide.

Finally, we are working at both a state and federal level on legislation to enhance the safety of our communities from evolving extreme weather risks while protecting the financial integrity of companies like Xcel Energy.

### Utility Subsidiaries

| NSP-Minnesota Electric customers Natural gas customers Total assets Rate Base (estimated) | 1.6 million NSP-Minnesota conducts business in Minnesota, North Dakota and South Dakota and has electric operations in all three states including the generation, purchase, transmission, distribution and sale of electricity. NSP-Minnesota and NSP-Wisconsin electric operations are managed on the NSP System. NSP-Minnesota also purchases, transports, distributes and sells natural gas to retail customers and transports customer-owned natural gas in Minnesota and North Dakota. 0.6 million $27.5 billion $17.4 billion |
| --- | --- |
| GAAP ROE | 9.07% |
| Ongoing ROE | 9.46% |
| Electric generating capacity (owned) | 8,623 MW |
| Gas storage capacity | 16.9 Bcf |
| Electric transmission lines (conductor miles) | 34,000 miles |
| Electric distribution lines (conductor miles) | 87,000 miles |
| Natural gas transmission lines | 78 miles |
| Natural gas distribution lines | 11,000 miles |

| NSP-Wisconsin Electric customers Natural gas customers Total assets Rate Base (estimated) | 0.3 million NSP-Wisconsin conducts business in Wisconsin and Michigan and generates, purchases, transmits, distributes and sells electricity. NSP-Minnesota and NSP-Wisconsin electric operations are managed on the NSP System. NSP-Wisconsin also purchases, transports, distributes and sells natural gas to retail customers and transports customer-owned natural gas. 0.1 million $4.1 billion $2.7 billion |
| --- | --- |
| GAAP ROE | 8.98% |
| Electric generating capacity (owned) | 500 MW |
| Gas storage capacity | 4.3 Bcf |
| Electric transmission lines (conductor miles) | 12,000 miles |
| Electric distribution lines (conductor miles) | 28,000 miles |
| Natural gas transmission lines | 3 miles |
| Natural gas distribution lines | 3,000 miles |

| PSCo Electric customers Natural gas customers Total assets Rate Base (estimated) | 1.6 million PSCo conducts business in Colorado and generates, purchases, transmits, distributes and sells electricity. PSCo also purchases, transports, distributes and sells natural gas to retail customers and transports customer-owned natural gas. 1.5 million $26.6 billion $19.3 billion |
| --- | --- |
| GAAP ROE | 7.63% |
| Electric generating capacity (owned) | 6,203 MW |
| Gas storage capacity | 32.1 Bcf |
| Electric transmission lines (conductor miles) | 25,000 miles |
| Electric distribution lines (conductor miles) | 82,000 miles |
| Natural gas transmission lines | 2,000 miles |
| Natural gas distribution lines | 24,000 miles |

| SPS Electric customers Total assets Rate Base (estimated) | SPS conducts business in Texas and New Mexico and generates, purchases, transmits, distributes and sells electricity. 0.4 million $10.8 billion $7.6 billion |
| --- | --- |
| GAAP ROE | 9.57% |
| Electric generating capacity (owned) | 5,100 MW |
| Electric transmission lines (conductor miles) | 41,000 miles |
| Electric distribution lines (conductor miles) | 25,000 miles |

8

### Operations Overview

Utility operations are generally conducted as either electric or gas utilities in our four utility subsidiaries.

### Electric Operations

Electric operations consist of energy supply, generation, transmission and distribution activities across all four utility subsidiaries. Xcel Energy had electric sales volume of 112,273 (millions of KWh), 3.9 million customers and electric revenues of $11,147 million for 2024.

| Electric Operations (percentage of total) | Sales Volume | Number of Customers | Revenues |
| --- | ---: | ---: | ---: |
| Residential | 23% | 86% | 32% |
| C&I | 59 | 12 | 49 |
| Other | 18 | 2 | 19 |

### Retail Sales/Revenue Statistics (a)

|  | 2024 |  | 2023 |  |
| --- | ---: | --- | ---: | --- |
| KWh sales per retail customer | 23,908 |  | 23,939 |  |
| Revenue per retail customer | $2,357 |  | $2,464 |  |
| Residential revenue per KWh | 13.82 | ¢ | 13.80 | ¢ |
| C&I revenue per KWh | 8.24 | ¢ | 8.82 | ¢ |
| Total retail revenue per KWh | 9.86 | ¢ | 10.29 | ¢ |

(a) See Note 6 to the consolidated financial statements for further information.

### Owned and Purchased Energy Generation — 2024

### Electric Energy Sources

Total electric energy generation by source for the year ended Dec. 31:

### Carbon-Free

Xcel Energy’s carbon-free energy portfolio includes wind, nuclear, hydroelectric, biomass and solar power from both owned generation facilities and PPAs. Carbon-free percentages will vary year-over-year based on system additions, commodity costs, weather, system demand and transmission constraints.

See Item 2 — Properties for further information.

#### Wind

Wind capacity is shown as net maximum capacity. Net maximum capacity is attainable only when wind conditions are sufficiently available.

*Owned —* Owned and operated wind farms with corresponding capacity:

| Utility Subsidiary Wind Farms | 2024 Capacity (MW) | Wind Farms | 2023 Capacity (MW) |  |
| --- | ---: | ---: | ---: | ---: |
| NSP System | 17 | 2,445 | 17 | 2,444 |
| PSCo | 2 | 1,059 | 2 | 1,059 |
| SPS | 2 | 985 | 2 | 985 |
| Total | 21 | 4,489 | 21 | 4,488 |

*PPAs —* Number of PPAs with capacity range:

| Utility Subsidiary PPAs | 2024 Range (MW) | PPAs | 2023 Range (MW) |  |
| --- | ---: | --- | ---: | --- |
| NSP System | 116 | 1 — 206 | 120 | 1 — 206 |
| PSCo | 16 | 23 — 301 | 17 | 23 — 301 |
| SPS | 16 | 1 — 250 | 16 | 1 — 250 |

*PPAs —* Contracted wind capacity (MW) for PPAs:

| Utility Subsidiary | 2024 | 2023 |
| --- | ---: | ---: |
| NSP System | 2,061 | 2,066 |
| PSCo | 2,996 | 3,026 |
| SPS | 1,562 | 1,562 |

*Average Cost —* Average cost per MWh of wind energy from owned generation and existing PPAs:

| Type | Utility Subsidiary | 2024 | 2023 |
| --- | --- | ---: | ---: |
| Owned Generation (a) | NSP System | $7 | $7 |
| PPA | NSP System | 32 | 33 |
| Owned Generation (a) | PSCo | 4 | 7 |
| PPA | PSCo | 43 | 42 |
| Owned Generation (a) | SPS | 1 | 6 |
| PPA | SPS | 28 | 26 |

(a) Includes the impact of PTCs.

Xcel Energy currently has approximately 1,900 MW of owned wind under development or being repowered. This includes 350 MW of approved repowering projects at the NSP System estimated to be completed in 2025. The Company anticipates approximately 1,550 MW at PSCo as part of the Colorado Resource Plan and anticipates approval of an additional 300 MW of PPAs as part of the Colorado Resource Plan, additions are expected to be placed in service between 2026 - 2028.

Additionally, the NSP System anticipates 3,200 MW to be placed in service by 2030, as part of the recently approved Upper Midwest Resource Plan. The RFP process will start in 2025.

#### Solar

*Owned —* Owned and operated solar projects with corresponding capacity:

| Utility Subsidiary Solar Projects | 2024 Capacity (MW) | Solar Projects | 2023 Capacity (MW) |  |
| --- | ---: | ---: | ---: | ---: |
| NSP System (a) | 1 | 223 | — | — |

(a) NSP-Minnesota placed in service Sherco Solar 1 in the fourth quarter of 2024. Average cost per MWh will be available after a full year of operations.

*PPAs —* Solar PPAs capacity by type:

| Type | Utility Subsidiary | Capacity (MW) |
| --- | --- | ---: |
| Distributed Generation | NSP System | 1,461 |
| Utility-Scale | NSP System | 349 |
| Distributed Generation | PSCo | 1,031 |
| Utility-Scale (a) | PSCo | 1,530 |
| Distributed Generation | SPS | 30 |
| Utility-Scale | SPS | 192 |
| Total |  | 4,593 |

(a) Includes battery storage capacity of 225 MW.

*Average Cost (PPAs) —* Average cost per MWh of solar energy under existing distributed and utility-scale generation PPAs:

| Utility Subsidiary | 2024 | 2023 |
| --- | ---: | ---: |
| NSP System | $100 | $90 |
| PSCo | 31 | 34 |
| SPS | 68 | 67 |

*Solar Development —* Xcel Energy currently has approximately 2,700 MW of owned and PPA solar under development. For the NSP System, this includes 500 MW of solar approved at the Sherco site which are expected to be placed in service in 2025 and 2026. Additionally, various PPAs totaling approximately 105 MW are expected to be completed throughout 2025. Incremental to this amount is 400 MW anticipated as part of the Upper Midwest Resource Plan, to be placed in service by 2030.

PSCo anticipates development of approximately 1,700 MW of solar generation resources (650 MW company owned, 1,050 MW as PPAs) as part of the Colorado Resource Plan. Colorado Resource Plan additions are expected to be placed in service between 2026 - 2028.

For SPS, approximately 450 MW of solar and storage are expected to be placed in service in 2026 and 2027.

#### Nuclear

Xcel Energy has two nuclear plants with approximately 1,700 MW of total 2024 net summer dependable capacity that safely and reliably generates carbon free electricity for the NSP System. Xcel Energy secures contracts for uranium concentrates, uranium conversion, uranium enrichment and fuel fabrication to operate its nuclear plants. We use varying contract lengths as well as multiple producers for uranium concentrates, conversion services and enrichment services to minimize potential impacts caused by supply interruptions due to geographical and world political issues.

*Nuclear Fuel Cost —* Delivered cost per MMBtu of nuclear fuel consumed for owned electric generation and the percentage of total fuel requirements (nuclear, natural gas and coal):

| Utility Subsidiary NSP System | Nuclear Cost | Percent |
| --- | ---: | ---: |
| 2024 | $0.83 | 43% |
| 2023 | 0.76 | 50 |

*Other —* Xcel Energy’s other carbon-free energy portfolio includes hydro from owned generating facilities.

The NSP System anticipates development of approximately 300 MW of storage capacity at the Sherco site, expected to be placed in service in 2027. Additionally, 600 MW of stand-alone storage are expected to be added as part of the Upper Midwest Resource Plan, to be placed in service by 2030.

PSCo anticipates development of approximately 1,850 MW of storage capacity (400 MW company owned, 1,450 MW as PPAs) as part of the Colorado Resource Plan. Colorado Resource Plan additions are expected to be placed in service between 2026 - 2028.

See Item 2 — Properties for further information.

### Fossil Fuel

Xcel Energy’s fossil fuel energy portfolio includes coal and natural gas power from both owned generating facilities and PPAs.

#### Coal

Xcel Energy owned and operated coal units with approximately 5,500 MW of total 2024 net summer dependable capacity, which provided 15% of Xcel Energy’s energy mix in 2024. This amount includes the coal units Harrington Units 1-3, which are in the process of being converted to natural gas (net summer dependable capacity of 1,018 MW) and approximately 100 MW derived from RDF and wood fuel sources.

Xcel Energy has plans to retire or convert to natural gas all of its existing coal generation by the end of 2030. Approved early coal plant retirements:

| Year | Utility Subsidiary | Plant Unit | Capacity (MW) |  |
| --- | --- | --- | ---: | --- |
| 2025 | PSCo | Comanche 2 | 330 |  |
| 2025 | PSCo | Craig 1 | 42 | (a) |
| 2025 | PSCo | Pawnee (b) | 505 |  |
| 2026 | NSP-Minnesota | Sherco 1 | 680 |  |
| 2027 | PSCo | Hayden 2 | 98 | (a) |
| 2028 | PSCo | Hayden 1 | 135 | (a) |
| 2028 | PSCo | Craig 2 | 40 | (a) |
| 2028 | NSP-Minnesota | A.S. King | 511 |  |
| 2028 | SPS | Tolk 1 | 532 |  |
| 2028 | SPS | Tolk 2 | 535 |  |
| 2030 | NSP-Minnesota | Sherco 3 | 517 | (a) |
| 2030 | PSCo | Comanche 3 | 500 | (a) |

(a) Based on Xcel Energy’s ownership interest.

(b) Reflects planned conversion from coal to natural gas.

*Coal Fuel Cost —* Delivered cost per MMBtu of coal consumed for owned electric generation and the percentage of fuel requirements (nuclear, natural gas and coal):

| Utility Subsidiary NSP System | Coal (a) Cost | Percent |
| --- | ---: | ---: |
| 2024 | $2.24 | 22% |
| 2023 | 2.43 | 29 |
| **PSCo** |  |  |
| 2024 | 1.91 | 44 |
| 2023 | 1.57 | 54 |
| **SPS** |  |  |
| 2024 | 2.87 | 34 |
| 2023 | 2.73 | 48 |

(a) Includes RDF and wood for the NSP System.

#### Natural Gas

Xcel Energy has 22 natural gas plants with approximately 8,000 MW of total 2024 net summer dependable capacity, which provided 33% of Xcel Energy’s mix in 2024.

Natural gas supplies, transportation and storage services for power plants are procured to provide an adequate supply of fuel. Remaining requirements are procured through a liquid spot market. Generally, natural gas supply contracts have variable pricing that is tied to natural gas indices. Natural gas supply and transportation agreements include obligations for the purchase and/or delivery of specified volumes or payments in lieu of delivery.

*Natural Gas Cost —* Delivered cost per MMBtu of natural gas consumed for owned electric generation and the percentage of total fuel requirements (nuclear, natural gas and coal):

| Utility Subsidiary NSP System | Natural Gas Cost | Percent |
| --- | ---: | ---: |
| 2024 | $1.94 | 35% |
| 2023 | 3.91 | 21 |
| **PSCo** |  |  |
| 2024 | 2.77 | 56 |
| 2023 | 3.06 | 46 |
| **SPS** |  |  |
| 2024 | 0.94 | 66 |
| 2023 | 2.35 | 52 |

The NSP System anticipates the development of 700 MW of company owned natural gas generation expected to be placed in service between 2025 - 2028.

PSCo anticipates development of approximately 450 MW of company owned natural gas generation, as part of the Colorado Resource Plan to help ensure resiliency and reliability. Colorado Resource Plan additions are expected to be placed in service between 2026 - 2028.

In 2024, SPS converted a total of 339 MW from coal to natural gas related to the Harrington station coal to natural gas repowering project. In January 2025, an additional 341 MW has been converted to natural gas. Through 2025, SPS expects to convert a final 338 MW to natural gas.

### Capacity and Demand

Uninterrupted system peak demand and occurrence date:

| Utility Subsidiary | 2024 MW | Date | 2023 MW | Date |
| --- | ---: | --- | ---: | --- |
| NSP System | 8,822 | Aug. 26 | 9,231 | Aug. 23 |
| PSCo | 7,084 | Aug. 1 | 6,909 | July 24 |
| SPS | 4,437 | Aug. 19 | 4,372 | Aug. 17 |

### Transmission

Transmission lines deliver electricity at high voltages and over long distances from power sources to substations closer to customers. A strong transmission system ensures continued reliable and affordable service, ability to meet state and regional energy policy goals, and support for a diverse generation mix, including renewable energy. Xcel Energy owns approximately 111,000 conductor miles of transmission lines across its service territory.

See Item 2 - Properties for further information.

### Distribution

Distribution lines allow electricity to travel at lower voltages from substations directly to customers. Xcel Energy has a vast distribution network, owning and operating approximately 221,000 conductor miles of distribution lines across our eight-state service territory.

See Item 2 - Properties for further information.

### Natural Gas Operations

Natural gas operations consist of purchase, transportation and distribution of natural gas to end-use residential, C&I and transport customers in NSP-Minnesota, NSP-Wisconsin and PSCo. Xcel Energy had natural gas deliveries of 387,513 (thousands of MMBtu), 2.2 million customers and natural gas revenues of $2,230 million for 2024.

| Natural Gas (percentage of total) | Deliveries | Number of Customers | Revenues |
| --- | ---: | ---: | ---: |
| Residential | 35% | 92% | 58% |
| C&I | 24 | 8 | 29 |
| Transportation and other | 41 | \<1 | 13 |

***Sales/Revenue Statistics*** (a)

|  | 2024 | 2023 |
| --- | ---: | ---: |
| MMBtu sales per retail customer | 105 | 115 |
| Revenue per retail customer | $896 | $1,113 |
| Residential revenue per MMBtu | 9.48 | 10.54 |
| C&I revenue per MMBtu | 7.04 | 8.48 |
| Transportation and other revenue per MMBtu | 1.10 | 1.01 |

(a) See Note 6 to the consolidated financial statements for further information.

### Capability and Demand

Natural gas supply requirements are categorized as firm or interruptible.

Maximum daily output (firm and interruptible) and occurrence date:

| Utility Subsidiary | 2024 MMBtu | Date | 2023 MMBtu | Date |
| --- | ---: | --- | ---: | --- |
| NSP-Minnesota | 841,164 | Jan. 19 | 753,642 | Feb. 3 |
| NSP-Wisconsin | 163,246 | Jan.17 | 158,029 | Jan. 30 |
| PSCo | 2,357,931 | Jan.15 | 2,190,155 | Jan. 30 |

### Natural Gas Supply and Cost

Xcel Energy seeks natural gas supply, transportation and storage alternatives to yield a diversified portfolio, which increases flexibility and decreases interruption, financial risks and customer rates. In addition, the utility subsidiaries conduct natural gas price hedging activities approved by their states’ commissions.

Average delivered cost per MMBtu of natural gas for regulated retail distribution:

| Utility Subsidiary | 2024 | 2023 |
| --- | ---: | ---: |
| NSP-Minnesota | $3.97 | $5.31 |
| NSP-Wisconsin | 3.77 | 5.26 |
| PSCo | 3.36 | 4.91 |

NSP-Minnesota, NSP-Wisconsin and PSCo have natural gas supply transportation and storage agreements that include obligations for purchase and/or delivery of specified volumes or to make payments in lieu of delivery.

### General

### General Economic Conditions

Economic conditions may have a material impact on Xcel Energy’s operating results. Management cannot predict the impact of fluctuating energy or commodity prices, pandemics, terrorist activity, war or the threat of war. We could experience a material impact to our results of operations, future growth or ability to raise capital resulting from a sustained general slowdown in economic growth or a significant increase in interest rates or inflation.

### Seasonality

Demand for electric power and natural gas is affected by seasonal differences in the weather. In general, peak sales of electricity occur in the summer months and peak sales of natural gas occur in the winter months. As a result, the overall operating results may fluctuate substantially on a seasonal basis. Additionally, Xcel Energy’s operations have historically generated less revenues and income when weather conditions are warmer in the winter and cooler in the summer. Sales true-up and decoupling mechanisms mitigate the impacts of weather in certain jurisdictions.

### Competition

Xcel Energy is subject to public policies that promote competition and development of energy markets. Xcel Energy’s industrial and large commercial customers have the ability to generate their own electricity. In addition, customers may have the option of substituting other fuels or relocating their facilities to a lower cost region.

Customers have the opportunity to supply their own power with distributed generation including solar generation and can currently avoid paying for most of the fixed production, transmission and distribution costs incurred to serve them in most jurisdictions.

Several states have incentives for the development of rooftop solar, community solar gardens and other distributed energy resources. Distributed generating resources are potential competitors to Xcel Energy’s electric service business with these incentives and federal tax subsidies.

The FERC has continued to promote competitive wholesale markets through open access transmission and other means. Xcel Energy’s wholesale customers can purchase energy from other generation resources and transmission services from other service providers to serve their native load.

FERC Order No. 1000 established competition for ownership of certain new electric transmission facilities under Federal regulations. Some states have state laws that allow the incumbent a Right of First Refusal to own these transmission facilities.

FERC Order 2222 requires that RTO and ISO markets allow participation of aggregations of distributed energy resources. This order is expected to incentivize distributed energy resource adoption, however implementation is expected to vary by RTO/ISO and the near, medium, and long-term impacts of Order 2222 remain unclear.

Xcel Energy Inc.’s utility subsidiaries have franchise agreements with cities subject to periodic renewal; however, a city could seek alternative means to access electric power or gas, such as municipalization. No municipalization activities are occurring presently.

While each utility subsidiary faces these challenges, Xcel Energy believes their rates and services are competitive with alternatives currently available.

### Governmental Regulations

### Public Utility Regulation

See Item 7 for discussion of public utility regulation.

### Environmental Regulation

Our facilities are regulated by federal and state agencies that have jurisdiction over air emissions, water quality, wastewater discharges, solid and hazardous wastes or substances. Certain Xcel Energy activities require registrations, permits, licenses, inspections and approvals from these agencies.

Xcel Energy has received necessary authorizations for the construction and continued operation of its generation, transmission and distribution systems. Our facilities strive to operate in compliance with applicable environmental standards and related monitoring and reporting requirements.

However, it is not possible to determine what additional facilities or modifications to existing or planned facilities will be required as a result of changes to regulations, interpretations or enforcement policies or what effect future laws or regulations may have. We may be required to incur expenditures in the future for remediation of historic and current operating sites and other waste treatment, storage and disposal sites.

There are significant environmental regulations to encourage use of clean energy technologies and regulate emissions of GHGs. We have undertaken numerous initiatives to meet current requirements and prepare for potential future regulations, reduce GHG emissions and respond to state renewable and energy efficiency goals. Future environmental regulations may result in substantial costs. However, costs to comply with past environmental regulations have largely been recoverable through rates.

### Emerging Environmental Regulation

### Clean Air Act

*Power Plant Greenhouse Gas Regulations —* In April 2024, the EPA published final rules addressing control of CO2 emissions from the power sector. The rules regulate new natural gas generating units and emission guidelines for existing coal and certain natural gas generation. The rules create subcategories of coal units based on planned retirement date and subcategories of natural gas combustion turbines and combined cycle units based on utilization. The CO2 control requirements vary by subcategory. Based on current estimates and assumptions, Xcel Energy has determined that due to scheduled plant retirements, there is minimal financial or operational impact associated with these requirements and believes that the cost of these initiatives or replacement generation would be recoverable through rates based on prior state commission practices.

*Waste-to-Energy Air Regulations —* In January 2024, the EPA proposed air regulations addressing new and existing large municipal waste combustors. The proposed rules lower current emission standards for certain pollutants and would require installation of new pollution controls and/or more intense use of existing pollution controls at French Island Generating Station, Red Wing Generating Plant and Wilmarth Generating Plant. Until final rules are issued, it is not certain what the impact will be on Xcel Energy. Xcel Energy believes that the cost of these initiatives or replacement generation would be recoverable through rates based on prior state commission practices.

### Emerging Contaminants of Concern

PFAS are man-made chemicals that are widely used in consumer products and can persist and bio-accumulate in the environment. Xcel Energy does not manufacture PFAS, but because PFAS are so ubiquitous in products and the environment, it may impact our operations.

In June 2024, the EPA finalized a rule that designated certain PFAS as hazardous substances under CERCLA. In July 2024, the EPA finalized another rule that set enforceable drinking water standards for certain PFAS.

Potential costs for these rules and any additional proposed regulations related to PFAS are uncertain and will be determined on a site specific basis where applicable. If costs are incurred, Xcel Energy believes the costs will be recoverable through rates based on prior state commission practices.

### Effluent Limitation Guidelines

In April 2024, the EPA published final rules under the Clean Water Act, setting Effluent Limitations Guidelines and Standards for steam generating coal plants. This rule establishes more stringent wastewater discharge standards for bottom ash transport water, flue-gas desulfurization wastewater, and combustion residuals leachate from steam electric power plants, particularly coal-fired power plants. Based on current estimates and assumptions, Xcel Energy has determined that there is minimal financial or operational impact associated with these requirements and that any costs would be recoverable through rates based on prior state commission practices.

### Environmental Costs

Environmental costs include amounts for nuclear plant decommissioning and payments for storage of spent nuclear fuel, disposal of hazardous materials and waste, remediation of contaminated sites, monitoring of discharges to the environment and compliance with laws and permits with respect to emissions.

Costs charged to operating expenses for nuclear decommissioning, spent nuclear fuel disposal, environmental monitoring and remediation and disposal of hazardous materials and waste and depreciation of previously incurred capital expenditures for environmental improvements were approximately:

- $290 million in 2024.
- $275 million in 2023.
- $365 million in 2022.

Average annual expense of approximately $330 million from 2025 – 2029 is estimated for similar costs. The precise timing and amount of environmental costs, including those for site remediation and disposal of hazardous materials, are unknown. Additionally, the extent to which environmental costs will be recovered through rates may fluctuate.

Capital expenditures for environmental improvements were approximately:

- $25 million in 2024.
- $20 million in 2023.
- $20 million in 2022.

Certain previously collected nuclear storage costs for the federal nuclear waste program are reimbursed to customers by the federal government as a result of a settlement we pursued regarding the government’s failure to deliver a disposal program. Installments received are reimbursed to customers as approved by the MPUC and other state regulators.

### Other

Our operations are subject to workplace safety standards under the Federal Occupational Safety and Health Act of 1970 (“OSHA”) and comparable state laws that regulate the protection of worker health and safety. In addition, the Company is subject to other government regulations impacting such matters as labor, competition, data privacy, etc. Based on information to date and because our policies and business practices are designed to comply with all applicable laws, we do not believe the effects of compliance on our operations, financial condition or cash flows are material.

### Capital Spending and Financing

See Item 7 for discussion of capital expenditures and funding sources.

*Information about our Executive Officers (a)*

| Name | Age | Current and Recent Positions | Time in Position |
| --- | ---: | --- | --- |
| Robert C. Frenzel | 54 | Chairman of the Board of Directors, Xcel Energy Inc. | December 2021 — Present |
|  |  | President and Chief Executive Officer and Director, Xcel Energy Inc. | August 2021 — Present |
|  |  | Chief Executive Officer, NSP-Minnesota, NSP-Wisconsin, PSCo and SPS | August 2021 — Present |
|  |  | President and Chief Operating Officer, Xcel Energy Inc. | March 2020 — August 2021 |
|  |  | Executive Vice President, Chief Financial Officer, Xcel Energy Inc. | May 2016 — March 2020 |
| Robert Berntsen | 55 | Executive Vice President, Chief Legal and Compliance Officer, Xcel Energy Inc. | May 2024 — Present |
|  |  | Senior Vice President, General Counsel, BHE Renewables, LLC, a development and commercial management of renewable energy projects company | December 2020 — May 2024 |
|  |  | Senior Vice President, General Counsel, Corporate Secretary and Chief Compliance Officer, MidAmerican Energy Company, a regulated electric and gas utility | March 2015 — December 2020 |
| Patricia Correa | 51 | Senior Vice President, Chief Human Resources Officer, Xcel Energy Inc. | February 2022 — Present |
|  |  | Senior Vice President, Human Resources, Eaton Corporation, a power management company | July 2019 — January 2022 |
| Timothy O’Connor | 65 | Executive Vice President, Chief Operations Officer, Xcel Energy Inc. | August 2021 — Present |
|  |  | Executive Vice President, Chief Generation Officer, Xcel Energy Inc. | March 2020 — August 2021 |
|  |  | Senior Vice President, Chief Nuclear Officer, Xcel Energy Services Inc | February 2013 — March 2020 |
| Amanda Rome | 44 | Executive Vice President, Group President, Utilities, and Chief Customer Officer, Xcel Energy Inc. | October 2023 — Present |
|  |  | Interim General Counsel, Xcel Energy Inc. | January 2024 — May 2024 |
|  |  | Executive Vice President, Chief Legal and Compliance Officer, Xcel Energy Inc. | June 2022 — October 2023 |
|  |  | Executive Vice President, General Counsel, Xcel Energy Inc. | June 2020 — June 2022 |
|  |  | Vice President and Deputy General Counsel, Xcel Energy Services Inc. | October 2019 — June 2020 |
| Brian J. Van Abel | 43 | Executive Vice President, Chief Financial Officer, Xcel Energy Inc. | March 2020 — Present |
|  |  | Senior Vice President, Finance and Corporate Development, Xcel Energy Services Inc. | September 2018 — March 2020 |

(a) No family relationships exist between any of the executive officers or directors.

## Risk factors

As filed, 48,525 characters.

Xcel Energy is subject to a variety of risks, many of which are beyond our control. Risks that may adversely affect the business, financial condition, results of operations or cash flows are described below. Although the risks are organized by heading, and each risk is described separately, many of the risks are interrelated. These risks should be carefully considered together with the other information set forth in this report and future reports that Xcel Energy files with the SEC.

While we believe we have identified and discussed below the key risk factors affecting our business, there may be additional risks and uncertainties that are not presently known or that are not currently believed to be significant that may adversely affect our business, financial condition, results of operations or cash flows in the future.

### Oversight of Risk and Related Processes

The Board of Directors is responsible for the oversight of material risk and maintaining an effective risk monitoring process. Management and the Board of Directors’ committees have responsibility for overseeing the identification and mitigation of key risks and reporting its assessments and activities to the full Board of Directors.

Xcel Energy maintains a robust compliance program and promotes a culture of compliance beginning with the tone at the top. The risk mitigation process includes adherence to our Code of Conduct and compliance policies, operation of formal risk management structures and overall business management. Xcel Energy further mitigates inherent risks through formal risk committees and corporate functions such as internal audit, and internal controls over financial reporting and legal.

Management identifies and analyzes risks to determine materiality and other attributes such as timing, probability and controllability. Identification and risk analysis occurs formally through risk assessment conducted by senior management, the financial disclosure process, hazard risk procedures, internal audit and compliance with financial and operational controls.

Management also identifies and analyzes risk through the business planning process, development of goals and establishment of key performance indicators, including identification of barriers to implementing Xcel Energy’s strategy. The business planning process also identifies likelihood and mitigating factors to prevent the assumption of inappropriate risk to meet goals.

Management communicates regularly with the Board of Directors and key stakeholders regarding risk. Senior management presents and communicates a periodic risk assessment to the Board of Directors, providing information on the risks that management believes are material, including financial impact, timing, likelihood and mitigating factors. The Board of Directors regularly reviews management’s key risk assessments, which includes areas of existing and future macroeconomic, financial, operational, policy, environmental, safety and security risks.

The oversight, management and mitigation of risk is an integral and continuous part of the Board of Directors’ governance of Xcel Energy. The Board of Directors assigns oversight of critical risks to each of its four committees to confirm these risks are well understood and given appropriate focus.

The Audit Committee is responsible for reviewing the adequacy of the committees’ risk oversight and affirming appropriate aggregate oversight occurs. Committees regularly report on their oversight activities and certain risk issues may be brought to the full Board of Directors for consideration when deemed appropriate.

Emerging risks are considered and assigned as appropriate during the annual Board of Directors and committee evaluation process, resulting in updates to the committee charters and annual work plans. Additionally, the Board of Directors conducts an annual strategy session where Xcel Energy’s future plans and initiatives are reviewed.

### Risks Associated with Our Business

### Operational Risks

***Our natural gas and electric generation/transmission and distribution operations involve numerous risks that may result in accidents and other operating risks and costs.***

Our natural gas transmission and distribution activities include inherent hazards and operating risks, such as leaks, explosions, outages and mechanical problems. Our electric generation, transmission and distribution activities include inherent hazards and operating risks such as contact, fire and outages.

These risks could result in loss of life, significant property damage, environmental pollution, impairment of our operations and substantial financial losses to customers, the public, employees or third-party contractors. We maintain insurance against most, but not all, of these risks and losses.

The occurrence of these events, if not fully covered by insurance, could have a material effect on our financial condition, results of operations and cash flows as well as potential reputational impact.

Other uncertainties and risks inherent in operating and maintaining Xcel Energy's facilities include, but are not limited to:

- Risks associated with facility start-up operations, such as whether the facility will achieve projected operating performance on schedule and otherwise as planned.
- Failures in the availability, acquisition or transportation of fuel or other supplies.
- Impact of adverse weather conditions and natural disasters, including, wildfires, tornadoes, avalanches, icing events, floods, high winds, droughts and the availability or changes to wind patterns
- Performance below expected or contracted levels of output or efficiency.
- Availability of replacement or new equipment.
- Availability of adequate water resources and ability to satisfy water intake and discharge requirements.
- Inability to identify, manage properly or mitigate equipment defects.
- Use of new or unproven technology.
- Inability to use information effectively given the rapidly increasing volume of data.
- Risks associated with dependence on a specific type of fuel or fuel source, such as commodity price risk, availability of adequate fuel supply and transportation and lack of available alternative fuel sources.
- Increased competition due to, among other factors, new facilities, excess supply, shifting demand and regulatory changes.
- Increased costs due to aging infrastructure.

Additionally, compliance with existing and potential new regulations related to the operation and maintenance of our natural gas infrastructure could result in significant costs. The PHMSA is responsible for administering the DOT’s national regulatory program to assure the safe transportation of natural gas, petroleum and other hazardous materials by pipelines. The PHMSA continues to develop regulations and other approaches to risk management to assure safety in design, construction, testing, operation, maintenance and emergency response of natural gas pipeline infrastructure. We have programs in place to comply with these regulations and systematically monitor and renew infrastructure over time, however, a significant incident or material finding of non-compliance could result in penalties and higher costs of operations.

Our natural gas and electric transmission and distribution operations are dependent upon complex information technology systems and network infrastructure, the failure of which could disrupt our normal business operations, which could have a material adverse effect on our ability to process transactions and provide services.

### Our utility operations are subject to long-term planning and project risks.

Most utility investments are planned to be used for decades. Transmission and generation investments typically have long lead times and are planned well in advance of in-service dates and typically subject to long-term resource plans. These plans are based on numerous assumptions such as: sales growth, customer usage, commodity prices, economic activity, costs, regulatory mechanisms, customer behavior, available technology and public policy. Xcel Energy’s long-term resource plan is dependent on our ability to obtain required approvals (including regulatory approval in jurisdictions where Xcel Energy operates), develop necessary technical expertise, allocate and coordinate sufficient resources and adhere to budgets and timelines.

In addition, the long-term nature of both our planning processes and our asset lives are subject to risk. The utility sector is undergoing significant change (e.g., increases in energy efficiency, wider adoption of distributed generation and shifts away from fossil fuel generation to renewable generation). Customer adoption of these technologies and increased energy efficiency could result in excess transmission and generation resources, downward pressure on sales growth, and potentially stranded costs if we are not able to fully recover costs and investments.

The magnitude and timing of resource additions and changes in customer demand may not coincide with evolving customer preference for generation resources and end-uses, which introduces further uncertainty into long-term planning. Efforts to electrify the transportation and building sectors to reduce GHG emissions may result in higher electric demand and lower natural gas demand over time. New data centers and crypto mining facilities could generate significant increase in demand. Higher electric demand may require us to adopt new technologies and make significant generation, transmission and distribution investments including advanced grid infrastructure, which increases exposure to overall grid instability and technology obsolescence. Evolving stakeholder preference for lower emissions from generation sources and end-uses, like heating, may impact our resource mix and put pressure on our ability to recover capital investments in natural gas generation and delivery. Multiple states may not agree as to the appropriate resource mix, which may lead to costs to comply with one jurisdiction that are not recoverable across all jurisdictions served by the same assets.

We require inputs such as coal, natural gas, uranium and water. Lack of availability of these resources could jeopardize long-term operations of our facilities or make them uneconomic to operate.

***Our utilities are highly dependent on suppliers to deliver components in accordance with short and long-term project schedules.***

Our products contain components that are globally sourced from suppliers. A shortage of key components in which an alternative supplier is not identified could significantly impact operations and project plans for Xcel Energy and our customers. Such impacts could include timing of projects and the potential for project cancellation. Failure to adhere to project budgets and timelines could adversely impact our results of operations, financial condition or cash flows.

***We are subject to physical and financial risks associated with climate change and other weather, natural disaster and resource depletion impacts.***

Climate change can create physical and financial risk. Physical risks include changes in weather conditions and extreme weather events. Our customers’ energy needs vary with weather. To the extent weather conditions are affected by climate change, customers’ energy use could increase or decrease. Increased energy use due to weather changes over the long-term may require us to invest in generating assets, transmission and infrastructure. Decreased energy use due to weather changes may result in decreased revenues.

Severe weather impacts our service territories, primarily when thunderstorms, flooding, tornadoes, wildfires, snow, ice storms or extreme temperatures (high heating/cooling days) occur. Extreme weather conditions in general require system backup and can contribute to increased system stress, including service interruptions. Extreme weather conditions creating high energy demand may raise electricity prices, increasing the cost of energy we provide to our customers.

To the extent the frequency of extreme weather events increases, this could increase our cost of providing service and result in more frequent service interruptions. Periods of extreme temperatures could also impact our ability to meet demand.

Drought or water depletion could adversely impact our ability to provide electricity to customers, cause early retirement of power plants that require water or increase the cost for energy.

Adverse events may result in increased insurance costs and/or decreased insurance availability. We may not recover all costs related to mitigating these physical and financial risks.

### Our utilities have physical and financial risks associated with wildfires.

In recent years, wildfires have impacted the utility industry. More frequent and severe drought conditions, extreme swings in amount and timing of precipitation, changes in vegetation, unseasonably warm temperatures, very low humidity, stronger winds and other factors have increased the duration of the wildfire season and the potential impact of an event. Also, the expansion of the wildland urban interface increases the wildfire risk to surrounding communities and Xcel Energy's electric and natural gas infrastructure. Wildfires could jeopardize Xcel Energy’s electric and gas infrastructure and third-party property and result in temporary power outages or shortages in our service territories.

We have programs in place to mitigate the physical and financial risks associated with wildfires; however, Xcel Energy’s wildfire mitigation initiatives may not be successful or effective in preventing or reducing wildfire-related losses. Wildfires can occur even when Xcel Energy follows its procedures and implements its wildfire mitigation initiatives.

Other potential risks associated with wildfires and other climate events include the inability to secure sufficient insurance coverage, increased costs of insurance, or ability for insurers to meet their obligations, regulatory recovery risk, and the potential for a credit downgrade and subsequent additional costs to access capital markets.

While we carry liability insurance, given an extreme event, if Xcel Energy was found to be liable for wildfire damages, amounts could potentially exceed our coverage and negatively impact our results of operations, financial condition or cash flows.

***We are subject to commodity risks and other risks associated with energy markets and energy production.***

A significant increase in fuel costs could cause a decline in customer demand, adverse regulatory outcomes and an increase in bad debt expense which may have a material impact on our results of operations. Despite existing fuel cost recovery mechanisms in most of our states, higher fuel costs could significantly impact our results of operations if costs are not recovered. Delays in the timing of the collection of fuel cost recoveries could impact our cash flows and liquidity.

A significant disruption in supply could cause us to seek alternatives at potentially higher costs. Additionally, supply shortages may not be fully resolved, which negatively impacts our ability to provide services to our customers. Failure to provide service due to disruptions may also result in fines, penalties or cost disallowances through the regulatory process. Also, significantly higher energy or fuel costs relative to sales commitments negatively impacts our cash flows and results of operations.

We also engage in wholesale sales and purchases of electric capacity, energy and energy-related products as well as natural gas. In many markets, emission allowances and/or RECs are also needed to comply with various statutes and commission rulings. As a result, we are subject to market supply and commodity price risk.

Commodity price changes can affect the value of our commodity trading derivatives. We mark certain derivatives to estimated fair market value on a daily basis. Settlements can vary significantly from estimated fair values recorded and significant changes from the assumptions underlying our fair value estimates could cause earnings variability. The management of risks associated with hedging and trading is based, in part, on programs and procedures which utilize historical prices and trends.

Public perception often does not distinguish between pass through commodity costs and base rates. High commodity prices that are passed through to customer bills could impact our ability to recover costs for other improvements and operations.

Due to the uncertainty involved in price movements and potential deviation from historical pricing, Xcel Energy is unable to fully assure that its risk management programs and procedures would be effective to protect against all significant adverse market deviations.

In addition, Xcel Energy cannot fully assure that its controls will be effective against all potential risks. If such programs and procedures are not effective, Xcel Energy’s results of operations, financial condition or cash flows could be materially impacted.

***Failure to attract and retain a qualified workforce could have an adverse effect on operations.***

The competition for talent has become increasingly prevalent, and we have experienced increased employee turnover due to the condition of the labor market and decisions related to strategic workforce planning. In addition, specialized knowledge and skills are required for many of our positions, which may pose additional difficulty for us as we work to recruit, retain and motivate employees in this climate.

Failure to hire, adequately train replacement employees, transfer knowledge/expertise or future availability and cost of contract labor may adversely affect the ability to manage and operate our business. Inability to attract and retain these employees could adversely impact our results of operations, financial condition or cash flows.

Our businesses have collective bargaining agreements with labor unions. Failure to renew or renegotiate these contracts could lead to labor disruptions, including strikes or boycotts. Such disruptions or any negotiated wage or benefit increases could have a material adverse impact to our results of operations, financial condition or cash flows.

National unionization efforts could affect our business, as an increase in unionized workers could challenge our operational efficiency and increase costs.

***Our operations use third-party contractors in addition to employees to perform periodic and ongoing work.***

We rely on third-party contractors to perform operations, maintenance and construction work. Our contractual arrangements with these contractors typically include performance and safety standards, progress payments, insurance requirements and security for performance. Poor vendor performance or contractor unavailability could impact ongoing operations, restoration operations, regulatory recovery and our reputation and could introduce financial risk or risks of fines.

***Our employees, directors, third-party contractors, or suppliers may violate or be perceived to violate our Codes of Conduct, which could have an adverse effect on our reputation.***

We are exposed to risk of employee or third-party contractor fraud or misconduct. All employees and members of the Board of Directors are subject to compliance with our Code of Conduct and are required to participate in annual training. Additionally, suppliers are subject to compliance with our Supplier Code of Conduct.

Xcel Energy does not tolerate discrimination, violations of our Code of Conduct or other unacceptable behaviors. However, it is not always possible to identify and deter misconduct by employees and other third-parties, which may result in governmental investigations, other actions or lawsuits. If such actions are taken against us we may suffer loss of reputation and such actions could have a material effect on our financial condition, results of operations and cash flows.

### Our subsidiary, NSP-Minnesota, is subject to the risks of nuclear generation.

NSP-Minnesota has two nuclear generation plants, Prairie Island and Monticello. Risks of nuclear generation include:

- Hazards associated with the use of radioactive material in energy production, including management, handling, storage and disposal.
- Limitations on insurance available to cover losses that may arise in connection with nuclear operations, as well as obligations to contribute to an insurance pool in the event of damages at a covered U.S. reactor.
- Technological and financial uncertainties related to the costs of decommissioning nuclear plants may cause our funding obligations to change.

The NRC has authority to impose licensing and safety-related requirements for the operation of nuclear generation facilities, including the ability to impose fines and/or shut down a unit until compliance is achieved. NRC safety requirements could necessitate substantial capital expenditures or an increase in operating expenses. In addition, the INPO reviews NSP-Minnesota’s nuclear operations. Compliance with the INPO’s recommendations could result in substantial capital expenditures or a substantial increase in operating expenses.

If a nuclear incident did occur, it could have a material impact on our results of operations, financial condition or cash flows. Furthermore, non-compliance or the occurrence of a serious incident at other nuclear facilities could result in increased industry regulation, which may increase NSP-Minnesota’s compliance costs.

### Financial Risks

***Our profitability depends on the ability of our utility subsidiaries to recover their costs, and changes in regulation may impair the ability of our utility subsidiaries to recover costs from their customers.***

We are subject to comprehensive regulation by federal and state utility regulatory agencies, including siting and construction of facilities, customer service and the rates that we can charge customers.

The profitability of our utility operations is dependent on our ability to recover the costs of providing energy and utility services and earn a return on capital investment. Our rates are generally regulated and are based on an analysis of the utility’s costs incurred in a test year. The utility subsidiaries are subject to both future and historical test years depending upon the regulatory jurisdiction. Thus, the rates a utility is allowed to charge may or may not match its costs at any given time. Rate regulation is premised on providing an opportunity to earn a reasonable rate of return on invested capital.

There can also be no assurance that our regulatory commissions will judge all the costs of our utility subsidiaries to be prudent, which could result in disallowances, or that the regulatory process will always result in rates that will produce full recovery.

Overall, management believes prudently incurred costs are recoverable given the existing regulatory framework. However, there may be changes in the regulatory environment that could impair the ability of our utility subsidiaries to recover costs historically collected from customers, or these subsidiaries could exceed caps on capital costs required by commissions and result in less than full recovery.

Changes in the long-term cost-effectiveness or to the operating conditions of our assets may result in early retirements of utility facilities. While regulation typically provides cost recovery for these types of changes, there is no assurance that regulators would allow full recovery of all remaining costs.

Higher than expected inflation, shortages of skilled labor, tariffs or federal policies may increase costs of construction and operations. Also, rising fuel costs could increase prices to consumers, all of which could increase the risk that our utility subsidiaries will not be able to fully recover their costs from their customers.

Adverse regulatory rulings (including changes in recovery mechanisms) or the imposition of additional regulations could negatively impact our results of operations, financial condition or cash flows.

***Any reductions in our credit ratings could increase our financing costs and the cost of maintaining certain contractual relationships.***

Our credit ratings are subject to change, and our credit ratings may be lowered or withdrawn by a rating agency. Significant events including disallowance of costs, use of historic test years, elimination of riders or interim rates, increasing depreciation lives, lower returns on equity, changes to equity ratios, impacts of tax policy and unfavorable litigation outcomes may impact our cash flows and credit metrics, potentially resulting in a change in our credit ratings. In addition, our credit ratings may change as a result of the differing methodologies or change in the methodologies used by the various rating agencies.

Any credit ratings downgrade could lead to higher borrowing costs or lower proceeds from equity issuances. It could also impact our ability to access capital markets. Also, our utility subsidiaries may enter into contracts that require posting of collateral or settlement if credit ratings fall below investment grade. The credit rating agencies may change their assessment or our regulatory or business risk, such as with the increase of climate events, which could negatively impact our credit ratings.

### We are subject to capital market and interest rate risks.

Utility operations require significant capital investment. As a result, we frequently need to access capital markets. Any disruption in capital markets could have a material impact on our ability to fund our operations. Capital market disruption and financial market distress could prevent us from issuing commercial paper, issuing new securities or cause us to issue securities with unfavorable terms and conditions, such as higher interest rates or lower proceeds from equity issuances. Higher interest rates on short-term borrowings with variable interest rates could also have an adverse effect on our operating results.

The performance of capital markets impacts the value of assets held in trusts to satisfy future obligations to decommission NSP-Minnesota’s nuclear plants and satisfy our defined benefit pension and postretirement benefit plan obligations. These assets are subject to market fluctuations and yield uncertain returns, which may fall below expected returns. A decline in the market value of these assets may increase funding requirements. Additionally, the fair value of the debt securities held in the nuclear decommissioning and/or pension trusts may be impacted by changes in interest rates.

### We are subject to credit risks.

Credit risk includes the risk that our customers will not pay their bills, which may lead to a reduction in our cash flows and liquidity and an increase in bad debt expense. Credit risk is comprised of numerous factors including the price of products and services provided, the overall economy and unemployment rates.

Credit risk also includes the risk that counterparties that owe us money or product will become insolvent and may breach their obligations. Should the counterparties fail to perform, we may be forced to enter into alternative arrangements. In that event, our financial results could be adversely affected and we may incur losses. This could be particularly impactful for long-lead time equipment contracts that require significant deposits and milestone payments, for items that may be difficult to procure elsewhere in the event of non-performance.

Xcel Energy may have direct credit exposure in our short-term wholesale and commodity trading activity to financial institutions trading for their own accounts or issuing collateral support on behalf of other counterparties. We may also have some indirect credit exposure due to participation in organized markets, (e.g., MISO, SPP, ERCOT and California ISO), in which any credit losses are socialized to all market participants.

We have additional indirect credit exposure to financial institutions from letters of credit provided as security by power suppliers under various purchased power contracts. If any of the credit ratings of the letter of credit issuers were to drop below investment grade, the supplier would need to replace that security with an acceptable substitute. If the security were not replaced, the party could be in default under the contract.

***Increasing costs of our defined benefit retirement plans and employee benefits may adversely affect our results of operations, financial condition or cash flows.***

We have defined benefit pension and postretirement plans that cover most of our employees. Assumptions related to future costs, return on investments, interest rates and other actuarial assumptions have a significant impact on our funding requirements of these plans. Estimates and assumptions may change. In addition, the Pension Protection Act sets the minimum funding requirements for defined benefit pension plans. Therefore, our funding requirements and contributions may change in the future.

Also, the payout of a significant percentage of pension plan liabilities in a single year, due to high numbers of retirements or employees leaving, would trigger settlement accounting and could require Xcel Energy to recognize incremental pension expense related to unrecognized plan losses in the year liabilities are paid. Changes in industry standards utilized in key assumptions (e.g., mortality tables) could have a significant impact on future obligations and benefit costs.

***Increasing costs associated with health care plans may adversely affect our results of operations.***

Increasing levels of large individual health care claims and overall health care claims could have an adverse impact on our results of operations, financial condition or cash flows. Health care legislation could also significantly impact our benefit programs and costs.

### We must rely on cash from our subsidiaries to make dividend payments.

Investments in our subsidiaries are our primary assets. Substantially all our operations are conducted by our subsidiaries. Consequently, our operating cash flows and ability to service our debt and pay dividends depends upon the operating cash flows of our subsidiaries and their payment of dividends.

Our subsidiaries are separate legal entities that have no obligation to pay any amounts due pursuant to our obligations or to make any funds available for dividends on our common stock. In addition, each subsidiary’s ability to pay dividends depends on statutory and/or contractual restrictions which may include requirements to maintain minimum levels of equity ratios, working capital or assets.

If the utility subsidiaries were to cease making dividend payments, our ability to pay dividends on our common stock or otherwise meet our financial obligations could be adversely affected. Our utility subsidiaries are regulated by state utility commissions, which possess broad powers to prioritize that the needs of the utility customers are met. We may be negatively impacted by the actions of state commissions that limit the payment of dividends by our utility subsidiaries.

### Federal tax law may significantly impact our business.

Our utility subsidiaries collect estimated federal, state and local tax payments through their regulated rates. Changes to federal tax law may benefit or adversely affect our earnings and customer costs. Tax depreciable lives and the value/availability of various tax credits or the timeliness of their utilization may impact the economics or selection of resources. If tax rates are increased, there could be timing delays before regulated rates provide for recovery of such tax increases in revenues. In addition, certain IRS tax policies, such as tax normalization, may impact our ability to economically deliver certain types of resources relative to market prices. Changes to the availability of tax credit transferability could impact our cash flows and the cost of certain types of resources.

### Macroeconomic Risks

### Economic conditions impact our business.

Xcel Energy’s operations are affected by economic conditions, which correlates to customers/sales growth (decline). Economic conditions may be impacted by recessionary factors, rising interest rates, inflation, the impacts of federal policy and insufficient financial sector liquidity leading to potential increased unemployment, which may impact customers’ ability to pay their bills, which could lead to additional bad debt expense.

Our utility subsidiaries face competitive factors, which could have an adverse impact on our financial condition, results of operations and cash flows. Further, worldwide economic activity impacts the demand for basic commodities necessary for utility infrastructure, which may inhibit our ability to acquire sufficient supplies. We operate in a capital-intensive industry and federal trade policy could significantly impact the cost of materials we use. There may be delays before these additional material costs can be recovered in rates.

The oil and gas industry represents our largest C&I customer base. Oil and natural gas prices are sensitive to market risk factors which may impact demand.

***We face risks related to health epidemics and other outbreaks, which may have a material effect on our financial condition, results of operations and cash flows.***

Health epidemics impact countries, communities, supply chains and markets. Uncertainty continues to exist regarding epidemics; the duration and magnitude of business restrictions including shutdowns (domestically and globally); the potential impact on the workforce including shortages of employees and third-party contractors due to quarantine policies, vaccination requirements or government restrictions; impacts on the transportation of goods, and the generalized impact on the economy.

We cannot ultimately predict whether an epidemic will have a material impact on our future liquidity, financial condition or results of operations. Nor can we predict the impact on the health of our employees, our supply chain or our ability to recover higher costs associated with managing an outbreak.

### Operations could be impacted by war, terrorism or other events.

Our generation plants, fuel storage facilities, transmission and distribution facilities and information and control systems may be targets of terrorist activities. Any disruption could impact operations or result in a decrease in revenues and additional costs to repair and insure our assets. These disruptions could have a material impact on our financial condition, results of operations or cash flows.

The potential for terrorism has subjected our operations to increased risks and could have a material effect on our business. We have incurred increased costs for security and capital expenditures in response to these risks. The insurance industry has also been affected by these events and the availability of insurance may decrease. In addition, insurance may have higher deductibles, higher premiums and more restrictive policy terms.

A disruption of the regional electric transmission grid, interstate natural gas pipeline infrastructure or other fuel sources, could negatively impact our business, brand and reputation. Because our facilities are part of an interconnected system, we face the risk of possible loss of business due to a disruption caused by the actions of a neighboring utility.

We also face the risks of possible loss of business due to significant events such as severe storms, temperature extremes, wildfires, widespread pandemic, generator or transmission facility outage, pipeline rupture, railroad disruption, operator error, sudden and significant increase or decrease in wind generation or a workforce disruption.

In addition, major catastrophic events throughout the world may disrupt our business. While we have business continuity plans in place, our ability to recover may be prolonged due to the type and extent of the event. Xcel Energy participates in a global supply chain, which includes materials and components that are globally sourced. A prolonged disruption could result in the delay of equipment and materials that may impact our ability to connect, restore and reliably serve our customers.

A major disruption could result in a significant decrease in revenues, additional costs to repair assets, and an adverse impact on the cost and availability of insurance, which could have a material impact on our results of operations, financial condition or cash flows.

***A cybersecurity incident or security breach could have a material effect on our business.***

We operate in an industry that requires the continued operation of sophisticated information technology, control systems and network infrastructure. In addition, we use our systems and infrastructure to create, collect, use, disclose, store, dispose of and otherwise process sensitive information, including Company data, customer energy usage data, and personal information regarding customers, employees and their dependents, contractors, shareholders and other individuals.

Xcel Energy’s generation, transmission, distribution and fuel storage facilities, information technology systems and other infrastructure or physical assets as well as information processed in our systems (e.g., information regarding our customers, employees, operations, infrastructure and assets) could be affected by cybersecurity incidents, including those caused by human error.

The utility industry has been the target of several attacks on operational systems and has seen an increased volume and sophistication of cybersecurity incidents from international activist organizations, other countries and individuals. We expect to continue to experience attempts to compromise our information technology and control systems, network infrastructure and other assets. To date, no cybersecurity incident or attack affecting us or our vendors has had a material impact on our business or results of operations.

Cybersecurity incidents could harm our businesses by limiting our generation, transmission and distribution capabilities, delaying our development and construction of new facilities or capital improvement projects to existing facilities, disrupting our customer operations or causing the release of customer information, all of which would likely receive state and federal regulatory scrutiny and could expose us to liability.

Xcel Energy’s generation, transmission systems and natural gas pipelines are part of an interconnected system. Therefore, a disruption caused by the impact of a cybersecurity incident on the regional electric transmission grid, natural gas pipeline infrastructure or other fuel sources of our third-party service providers’ operations, could also negatively impact our business.

Generative Artificial Intelligence, such as large language models like ChatGPT, present a range of challenges and potential risks as we consider impacts to the business. These challenges involve navigating the complexities of creating and deploying AI models that generate content autonomously. Data privacy, legal concerns, and security issues are all risks as this technology continues to be adopted.

Our supply chain for procurement of digital equipment and services may expose software or hardware to these risks and could result in a breach or significant costs of remediation. We are unable to quantify the potential impact of cybersecurity threats or subsequent related actions. Cybersecurity incidents and regulatory action could result in a material decrease in revenues and may cause significant additional costs (e.g., penalties, third-party claims, repairs, insurance or compliance) and potentially disrupt our supply and markets for natural gas, oil and other fuels.

We maintain security measures to protect our information technology and control systems, network infrastructure and other assets. However, these assets and the information they process may be vulnerable to cybersecurity incidents, including asset failure or unauthorized access to assets or information.

A failure or breach of our technology systems or those of our third-party service providers could disrupt critical business functions and may negatively impact our business, our brand, and our reputation. The cybersecurity threat is dynamic and evolves continually, and our efforts to prioritize network protection may not be effective given the constant changes to threat vulnerability.

While the Company maintains insurance relating to cybersecurity events, such insurance is subject to a number of exclusions and may be insufficient to offset any losses, costs or damages experienced. Also, the market for cybersecurity insurance is relatively new and coverage available for cybersecurity events is evolving as the industry matures.

***Our operating results may fluctuate on a seasonal and quarterly basis and can be adversely affected by milder weather.***

Our electric and natural gas utility businesses are seasonal, and weather patterns can have a material impact on our operating performance. Demand for electricity is often greater in the summer and winter months associated with cooling and heating. Because natural gas is heavily used for residential and commercial heating, the demand depends heavily upon weather patterns. A significant amount of natural gas revenues are recognized in the first and fourth quarters related to the heating season. Accordingly, our operations have historically generated less revenues and income when weather conditions are milder in the winter and cooler in the summer. Unusually mild winters and summers could have an adverse effect on our financial condition, results of operations or cash flows.

### Public Policy Risks

### Increased risks of regulatory penalties could negatively impact our business.

The Energy Act increased civil penalty authority for violation of FERC statutes, rules and orders. FERC can impose penalties of up to $1.5 million per violation per day, particularly as it relates to energy trading activities for both electricity and natural gas. In addition, NERC electric reliability standards and critical infrastructure protection requirements are mandatory and subject to potential financial penalties. Also, the PHMSA, Occupational Safety and Health Administration and other federal agencies have the authority to assess penalties.

In the event of serious incidents, these agencies may pursue penalties. In addition, certain states have the authority to impose substantial penalties. If a serious reliability, cybersecurity or safety incident did occur, it could have a material effect on our results of operations, financial condition or cash flows.

***The continued use of natural gas for both power generation and gas distribution have increasingly become a public policy advocacy target. These efforts may result in a limitation of natural gas as an energy source for both power generation and heating, which could impact our ability to reliably and affordably serve our customers.***

In recent years, there have been various local and state agency proposals within and outside our service territories that would attempt to restrict the use and availability of natural gas. If such policies were to prevail, we may be forced to make new resource investment decisions which could potentially result in stranded costs if we are not able to fully recover costs and investments and impact the overall reliability of our service.

### Environmental Policy Risks

***We may be subject to legislative and regulatory responses to climate change, with which compliance could be difficult and costly.***

Legislative and regulatory responses related to climate change may create financial risk as our facilities may be subject to additional regulation at either the state or federal level in the future. International agreements could additionally lead to future federal or state regulations.

In 2015, the United Nations Framework Convention on Climate Change reached consensus among 190 nations on an agreement (the Paris Agreement) that establishes a framework for GHG mitigation actions by all countries, with a goal of holding the increase in global average temperature to below 2º Celsius above pre-industrial levels and an aspiration to limit the increase to 1.5º Celsius. Although the United States has withdrawn from the Paris Agreement, many states and localities continue to pursue their own climate policies which could result in future additional GHG reductions.

The steps Xcel Energy has taken to date to reduce GHG emissions, including energy efficiency measures, adding renewable generation and retiring or converting coal plants to natural gas, occurred under state-endorsed resource plans, renewable energy standards and other state policies.

We may be subject to climate change lawsuits. An adverse outcome could require substantial capital expenditures and possibly require payment of substantial penalties or damages. Defense costs associated with such litigation can also be significant and could affect results of operations, financial condition or cash flows if such costs are not recovered through regulated rates.

If our regulators do not allow us to recover all or a part of the cost of capital investment or the O&M costs incurred to comply with the mandates, it could have a material effect on our results of operations, financial condition or cash flows.

***We are subject to environmental laws and regulations, with which compliance could be difficult and costly.***

We are subject to environmental laws and regulations that affect many aspects of our operations, including air emissions, water quality, wastewater discharges and the generation, transport and disposal of solid wastes and hazardous substances. Laws and regulations require us to obtain permits, licenses, and approvals and to comply with a variety of environmental requirements.

Environmental laws and regulations can also require us to restrict or limit the output of facilities or the use of certain fuels, shift generation to lower-emitting facilities, install pollution control equipment, clean up spills and other contamination and correct environmental hazards. Failure to meet requirements of environmental mandates may result in fines or penalties. We may be required to pay all or a portion of the cost to remediate sites where our past activities, or the activities of other parties, caused environmental contamination.

Changes in environmental policies and regulations or regulatory decisions may result in early retirements of our generation facilities. While regulation typically provides relief for these types of changes, there is no assurance that regulators would allow full recovery of all remaining costs.

We are subject to mandates to provide customers with clean energy, renewable energy and energy conservation offerings. It could have a material effect on our results of operations, financial condition or cash flows if our regulators do not allow us to recover the cost of capital investment or O&M costs incurred to comply with the requirements. Additionally, the impact of environmental laws and regulations may impact the economic health of consumers through higher prices of energy and purchased goods.

While we establish strategies and expectations related to climate change and other environmental matters, our ability to achieve any such strategies or expectations is subject to numerous factors and conditions, many of which are outside of our control. Examples of such factors include, but are not limited to, evolving legal, regulatory, and other standards, processes, and assumptions, the pace of scientific and technological developments, increased costs, the availability of requisite financing, and changes in carbon markets. Failures or delays (whether actual or perceived) in achieving our strategies or expectations related to climate change and other environmental matters could adversely affect our business, operations, and reputation, and increase risk of litigation.

In addition, existing environmental laws or regulations may be revised and new laws or regulations may be adopted. We may also incur additional unanticipated obligations or liabilities under existing environmental laws and regulations.

## Cybersecurity

As filed, 5,483 characters.

As described in Item 1A – Risk Factors, Xcel Energy operates in an industry that requires the continued operation of sophisticated information technology, control systems and network infrastructure, as such, our business is subject to the risk of interruption by cybersecurity incidents that range from attacks common to most industries, such as phishing and denial-of-service, to attacks from more sophisticated adversaries, including nation state actors, that target the critical infrastructure used in the operation of our business.

The Company has a security risk program in place to identify, assess, manage and report material risks from cybersecurity incidents. As a utility provider, Xcel Energy complies with reliability standards imposed by NERC, including critical infrastructure protection standards related to both cybersecurity and physical security. These standards imposed by NERC, in alignment with the NIST Cybersecurity Framework, are the basis for which Xcel Energy has designed the cybersecurity control framework within its security risk program.

Annually, as part of Xcel Energy’s enterprise risk program, an integrated cybersecurity risk identification and assessment is completed across Xcel Energy’s business, including generation, transmission, distribution and fuel storage facilities, information technology systems and other infrastructure or physical assets as well as information processed in our systems (including systems hosted by third parties) that could be affected by cybersecurity incidents. This analysis includes the impact, likelihood, timeframe and controllability of cybersecurity risks and is presented to the Board of Directors. Management monitors and reviews the results of this analysis, integrating them into the enterprise risk assessment processes and implements appropriate mitigating actions as needed.

Xcel Energy’s cybersecurity policies, standards, practices, annual cybersecurity training content and readiness are regularly assessed by third-party consultants. These partners are engaged to perform independent penetration testing and other security related services to assist in the prevention, detection, monitoring, mitigation and remediation of cybersecurity incidents and risks. The results of these assessments are communicated to management and the Board of Directors by the Chief Security Officer.

Xcel Energy employs a comprehensive risk based approach to assess the magnitude and significance of a vendor’s risk to the Company. Certain third-party service providers are subject to vendor security risk assessments at the time of integration, contract execution/renewal, and upon detection of any increase in risk profile. Xcel Energy uses a variety of inputs in such risk assessments, including information supplied by providers and third parties (including information analysis centers that share daily threat intelligence and improve organizational agility associated with management of cybersecurity risks). In addition, the Company requires certain third-party service providers to meet appropriate security requirements, controls and responsibilities. The Company deploys periodic monitoring activities to assess compliance with our cybersecurity control framework and investigates security incidents that have impacted our third-party service providers as appropriate.

Management has assigned responsibility for the security risk program to the Chief Security Officer who has multiple years of experience in the Defense Industrial Base. The Chief Security Officer is informed about and monitors prevention, detection, mitigation and remediation efforts through a team of security professionals, many of whom are Certified Information Systems Security Professionals, Certified Information Security Managers or have received other cybersecurity certifications. The team has extensive experience selecting, deploying and operating cybersecurity technologies, initiatives and processes that aid in preventing, remediating and mitigating known and unknown security threats.

The Chief Security Officer or members of management brief the Board on routine and regular cybersecurity risk and threat updates, typically on an annual basis. In the event of a significant threat or incident, management and the Chief Security Officer leverage Xcel Energy’s incident response processes to assess impacts and resolve incidents. When a significant cybersecurity incident occurs, management communicates with the Board of Directors and relevant committees.

The Board of Directors oversees the risks associated with cybersecurity and the physical security of our assets, with information security matters being discussed at board meetings as well as at the ONES and Audit Committee meetings throughout the year.

While the ONES Committee has primary committee responsibility for cybersecurity due to the operational issues involved, the Board of Directors has determined that the topic is of sufficient importance to warrant this comprehensive oversight approach. Augmenting such oversight efforts, the enterprise has the ability to notify and update the Board of Directors in the event of a possible crisis situation.

Cybersecurity risks are a part of Xcel Energy’s normal course of business. To date, no cybersecurity incident or attack affecting us or our vendors has had a material impact on our business or results of operations. As of Feb. 27, 2025 there have been no material cybersecurity incidents to report.

## Properties

As filed, 8,432 characters.

Virtually all of the utility plant property of the utility subsidiaries is subject to the lien of their respective first mortgage bond indentures.

| NSP-Minnesota Station, Location and Unit at Dec. 31, 2024 Steam: | Fuel | Installed | MW (a) |  |
| --- | --- | --- | ---: | --- |
| A.S. King-Bayport, MN, 1 Unit | Coal | 1968 | 511 |  |
| Sherco-Becker, MN |  |  |  |  |
| Unit 1 | Coal | 1976 | 680 |  |
| Unit 3 | Coal | 1987 | 517 | (b) |
| Monticello, MN, 1 Unit | Nuclear | 1971 | 617 |  |
| Prairie Island-Welch, MN |  |  |  |  |
| Unit 1 | Nuclear | 1973 | 521 |  |
| Unit 2 | Nuclear | 1974 | 519 |  |
| Various locations, 4 Units | Wood/RDF | Various | 36 | (c) |
| **Combustion Turbine:** |  |  |  |  |
| Angus Anson-Sioux Falls, SD, 3 Units | Natural Gas | 1994 - 2005 | 343 |  |
| Black Dog-Burnsville, MN, 3 Units | Natural Gas | 1987 - 2018 | 491 |  |
| Blue Lake-Shakopee, MN, 6 Units | Natural Gas/Oil | 1974 - 2005 | 454 |  |
| High Bridge-St. Paul, MN, 3 Units | Natural Gas | 2008 | 530 |  |
| Inver Hills-Inver Grove Heights, MN, 8 Units | Natural Gas/ Oil | 1972 - 1996 | 276 |  |
| Riverside-Minneapolis, MN, 3 Units | Natural Gas | 2009 | 454 |  |
| **Hydro:** |  |  |  |  |
| Hennepin Island-Minneapolis, MN 5 Units | Hydro | 1954-1955 | 6 |  |
| **Wind:** |  |  |  |  |
| Blazing Star 1-Lincoln County, MN, 100 Units | Wind | 2020 | 200 | (d) |
| Blazing Star 2-Lincoln County, MN, 100 Units | Wind | 2021 | 200 | (d) |
| Border-Rolette County, ND, 75 Units | Wind | 2015 | 148 | (d) |
| Community Wind North-Lincoln County, MN, 12 Units | Wind | 2020 | 26 | (d) |
| Courtenay Wind-Stutsman County, ND, 100 Units | Wind | 2016 | 190 | (d) |
| Crowned Ridge 2-Grant County, SD, 88 Units | Wind | 2020 | 192 | (d) |
| Dakota Range, SD, 72 Units | Wind | 2022 | 298 | (d) |
| Foxtail-Dickey County, ND, 75 Units | Wind | 2019 | 150 | (d) |
| Freeborn-Freeborn County, MN, 100 Units | Wind | 2021 | 200 | (d) |
| Grand Meadow-Mower County, MN, 67 Units | Wind | 2008 | 100 | (d) |
| Jeffers-Cottonwood County, MN, 20 Units | Wind | 2020 | 43 | (d) |
| Lake Benton-Pipestone County, MN, 44 Units | Wind | 2019 | 99 | (d) |
| Mower-Mower County, MN, 43 Units | Wind | 2021 | 91 | (d) |
| Nobles-Nobles County, MN, 133 Units | Wind | 2010 | 200 | (d) |
| Northern Wind-Murray County, MN, 37 Units | Wind | 2023 | 92 | (d) |
| Pleasant Valley-Mower County, MN, 100 Units | Wind | 2015 | 196 | (d) |
| Rock Aetna-Murray County, MN, 8 Units | Wind | 2022 | 20 | (d) |
| **Solar:** |  |  |  |  |
| Sherco Solar 1-Becker, MN, 63 units | Solar | 2024 | 223 |  |
|  |  | Total | 8,623 |  |

(a) Summer 2024 net dependable capacity. Wind and solar is presented as net maximum capacity.

(b) Based on NSP-Minnesota’s ownership of 59%.

(c) RDF is made from municipal solid waste.

(d) Net maximum capacity is attainable only when wind conditions are sufficiently available. Typical average capacity factors are 35-50% for wind facilities. For the year ended Dec. 31, 2024, NSP-Minnesota’s wind facilities had a weighted-average capacity factor of 46%.

| NSP-Wisconsin Station, Location and Unit at Dec. 31, 2024 Steam: | Fuel | Installed | MW (a) |  |
| --- | --- | --- | ---: | --- |
| Bay Front-Ashland, WI, 2 Units | Wood/Natural Gas | 1948 - 1956 | 41 |  |
| French Island-La Crosse, WI, 2 Units | Wood/RDF | 1940 - 1948 | 16 | (b) |
| **Combustion Turbine:** |  |  |  |  |
| French Island-La Crosse, WI, 2 Units | Oil | 1974 | 119 |  |
| Wheaton-Eau Claire, WI, 4 Units | Natural Gas/Oil | 1973 | 189 | (c) |
| **Hydro:** |  |  |  |  |
| Various locations, 62 Units | Hydro | Various | 135 |  |
|  |  | Total | 500 |  |

(a) Summer 2024 net dependable capacity.

(b) RDF is made from municipal solid waste.

(c) Retired unit in 2024.

| PSCo Station, Location and Unit at Dec. 31, 2024 Steam: Comanche-Pueblo, CO | Fuel | Installed | MW (a) |  |
| --- | --- | --- | ---: | --- |
| Unit 2 | Coal | 1975 | 330 |  |
| Unit 3 | Coal | 2010 | 500 | (b) |
| Craig-Craig, CO, 2 Units | Coal | 1979 - 1980 | 82 | (c) |
| Hayden-Hayden, CO, 2 Units | Coal | 1965 - 1976 | 233 | (d) |
| Pawnee-Brush, CO, 1 Unit | Coal | 1981 | 505 |  |
| Cherokee-Denver, CO, 1 Unit | Natural Gas | 1968 | 310 |  |
| **Combustion Turbine:** |  |  |  |  |
| Blue Spruce-Aurora, CO, 2 Units | Natural Gas | 2003 | 264 |  |
| Cherokee-Denver, CO, 3 Units | Natural Gas | 2015 | 576 |  |
| Fort St. Vrain-Platteville, CO, 6 Units | Natural Gas | 1972 - 2009 | 1,022 |  |
| Manchief-Brush, CO, 2 Units | Natural Gas | 2000 | 250 |  |
| Rocky Mountain-Keenesburg, CO, 3 Units | Natural Gas | 2004 | 592 |  |
| Valmont-Boulder, CO, 3 units | Natural Gas | 1973 - 2001 | 119 |  |
| Various locations, 5 Units | Natural Gas | Various | 128 |  |
| **Hydro:** |  |  |  |  |
| Cabin Creek-Georgetown, CO |  |  |  |  |
| Pumped Storage, 2 Units | Hydro | 1967 | 210 |  |
| Various locations, 6 Units | Hydro | Various | 23 |  |
| **Wind:** |  |  |  |  |
| Rush Creek, CO, 300 units | Wind | 2018 | 582 | (e) |
| Cheyenne Ridge, CO, 229 units | Wind | 2020 | 477 | (e) |
|  |  | Total | 6,203 |  |

(a) Summer 2024 net dependable capacity. Wind is presented as net maximum capacity.

(b) Based on PSCo’s ownership of 67%.

(c) Based on PSCo’s ownership of 10%.

(d) Based on PSCo’s ownership of 76% of Unit 1 and 37% of Unit 2.

(e) Net maximum capacity is attainable only when wind conditions are sufficiently available. Typical average capacity factors are 35-50% for wind facilities. For the year ended Dec. 31, 2024, PSCo’s wind facilities had a weighted-average capacity factor of 44%.

| SPS Station, Location and Unit at Dec. 31, 2024 Steam: | Fuel | Installed | MW (a) |  |
| --- | --- | --- | ---: | --- |
| Cunningham-Hobbs, NM, 1 Unit | Natural Gas | 1957 - 1965 | 183 |  |
| Harrington-Amarillo, TX 1 Unit | Natural Gas | 2024 | 339 | (b) |
| Harrington-Amarillo, TX 2 Units | Coal | 1976 - 1980 | 679 | (b) |
| Jones-Lubbock, TX, 2 Units | Natural Gas | 1971 - 1974 | 486 |  |
| Maddox-Hobbs, NM, 1 Unit | Natural Gas | 1967 | 112 |  |
| Nichols-Amarillo, TX, 3 Units | Natural Gas | 1960 - 1968 | 457 |  |
| Plant X-Earth, TX, 1 Unit | Natural Gas | 1952 - 1964 | 190 |  |
| Tolk-Muleshoe, TX, 2 Units | Coal | 1982 - 1985 | 1,067 |  |
| **Combustion Turbine:** |  |  |  |  |
| Cunningham-Hobbs, NM, 2 Units | Natural Gas | 1997 | 207 |  |
| Jones-Lubbock, TX, 2 Units | Natural Gas | 2011 - 2013 | 334 |  |
| Maddox-Hobbs, NM, 1 Unit | Natural Gas | 1963 - 1976 | 61 |  |
| **Wind:** |  |  |  |  |
| Hale-Plainview, TX, 239 Units | Wind | 2019 | 478 | (c) |
| Sagamore-Dora, NM, 240 Units | Wind | 2020 | 507 | (c) |
|  |  | Total | 5,100 |  |

(a) Summer 2024 net dependable capacity. Wind is presented as net maximum capacity.

(b) Harrington coal plant units 1-3 were retired in December 2024. Unit 2 was repowered to natural gas in the fourth quarter of 2024. Units 1 and 3 are also being repowered to natural gas in 2025, with Unit 1 having completed conversion in January and Unit 3 expected to be completed in the summer.

(c) Net maximum capacity is attainable only when wind conditions are sufficiently available. Typical average capacity factors are 35-50% for wind facilities. For the year ended Dec. 31, 2024 SPS’ wind facilities had a weighted-average capacity factor of 50%.

Electric utility overhead and underground transmission and distribution lines at Dec. 31, 2024:

| Conductor Miles Transmission | NSP-Minnesota | NSP-Wisconsin | PSCo | SPS |
| --- | ---: | ---: | ---: | ---: |
| 500 KV | 2,921 | — | — | — |
| 345 KV | 13,182 | 3,019 | 5,421 | 11,676 |
| 230 KV | 2,300 | — | 12,280 | 9,845 |
| 161 KV | 640 | 1,817 | — | — |
| 138 KV | — | — | 92 | — |
| 115 KV | 8,113 | 1,835 | 5,015 | 14,953 |
| Less than 115 KV | 6,627 | 5,324 | 1,796 | 4,501 |
| Total Transmission | 33,783 | 11,995 | 24,604 | 40,975 |
| **Distribution** |  |  |  |  |
| Less than 115 KV | 86,549 | 28,293 | 81,589 | 24,878 |
| **Total** | **120,332** | **40,288** | **106,193** | **65,853** |

Electric utility transmission and distribution substations at Dec. 31, 2024:

|  | NSP-Minnesota | NSP-Wisconsin | PSCo | SPS |
| --- | ---: | ---: | ---: | ---: |
| Substations | 354 | 201 | 235 | 454 |

Natural gas utility mains at Dec. 31, 2024:

| Miles | NSP-Minnesota | NSP-Wisconsin | PSCo | SPS | WGI |
| --- | ---: | ---: | ---: | ---: | ---: |
| Transmission | 78 | 3 | 1,998 | 35 | 11 |
| Distribution | 10,938 | 2,610 | 24,112 | — | — |

## Legal proceedings

As filed, 1,192 characters.

Xcel Energy is involved in various litigation matters in the ordinary course of business. The assessment of whether a loss is probable or is a reasonable possibility, and whether the loss or a range of loss is estimable, often involves a series of complex judgments about future events. Management maintains accruals for losses probable of being incurred and subject to reasonable estimation.

Management is sometimes unable to estimate an amount or range of a reasonably possible loss in certain situations, including but not limited to when (1) the damages sought are indeterminate, (2) the proceedings are in the early stages, or (3) the matters involve novel or unsettled legal theories. In such cases, there is considerable uncertainty regarding the timing or ultimate resolution of such matters, including a possible eventual loss.

For current proceedings not specifically reported herein, management does not anticipate that the ultimate liabilities, if any, would have a material effect on Xcel Energy’s consolidated financial statements. Legal fees are generally expensed as incurred.

See Note 12 to the consolidated financial statements, Item 1 and Item 7 for further information.

## Management's discussion and analysis

As filed, 110,787 characters.

### Non-GAAP Financial Measures

The following discussion includes financial information prepared in accordance with GAAP, as well as certain non-GAAP financial measures such as ongoing ROE, ongoing earnings and ongoing diluted EPS. Generally, a non-GAAP financial measure is a measure of a company’s financial performance, financial position or cash flows that is adjusted from measures calculated and presented in accordance with GAAP.

Xcel Energy’s management uses non-GAAP measures for financial planning and analysis, for reporting of results to the Board of Directors, in determining performance-based compensation and communicating its earnings outlook to analysts and investors. Non-GAAP financial measures are intended to supplement investors’ understanding of our performance and should not be considered alternatives for financial measures presented in accordance with GAAP. These measures are discussed in more detail below and may not be comparable to other companies’ similarly titled non-GAAP financial measures.

### Ongoing ROE

Ongoing ROE is calculated by dividing the net income or loss of Xcel Energy or each subsidiary, adjusted for certain nonrecurring items, by each entity’s average stockholder’s equity. We use these non-GAAP financial measures to evaluate and provide details of earnings results.

### Earnings Adjusted for Certain Items (Ongoing Earnings and Ongoing Diluted EPS)

GAAP diluted EPS reflects the potential dilution that could occur if securities or other agreements to issue common stock (i.e., common stock equivalents) were settled. The weighted average number of potentially dilutive shares outstanding used to calculate Xcel Energy Inc.’s diluted EPS is calculated using the treasury stock method. Ongoing earnings reflect adjustments to GAAP earnings (net income) for certain items. Ongoing diluted EPS is calculated by dividing the net income or loss of each subsidiary, adjusted for certain items, by the weighted average fully diluted Xcel Energy Inc. common shares outstanding for the period. Ongoing diluted EPS for each subsidiary is calculated by dividing the net income or loss of such subsidiary, adjusted for certain items, by the weighted average fully diluted Xcel Energy Inc. common shares outstanding for the period.

We use these non-GAAP financial measures to evaluate and provide details of Xcel Energy’s core earnings and underlying performance. For instance, to present ongoing earnings and ongoing diluted EPS, we may adjust the related GAAP amounts for certain items that are non-recurring in nature. We believe these measurements are useful to investors to evaluate the actual and projected financial performance and contribution of our subsidiaries. These non-GAAP financial measures should not be considered as an alternative to measures calculated and reported in accordance with GAAP.

The following table provides a reconciliation of GAAP earnings (net income) to ongoing earnings:

| (Millions of Dollars) | 2024 | 2023 |
| --- | ---: | ---: |
| GAAP net income | $1,936 | $1,771 |
| Loss on Comanche Unit 3 litigation | — | 35 |
| Workforce reduction expenses | — | 72 |
| Sherco Unit 3 2011 outage refunds | 47 | — |
| Less: tax effect of adjustments | (13) | (27) |
| Ongoing earnings (a) | $1,969 | $1,851 |

(a) Amounts may not add due to rounding.

| Diluted Earnings (Loss) Per Share | Twelve Months Ended Dec. 31, 2024 GAAP Diluted EPS | Impact of Adjustments | Ongoing Diluted EPS |
| --- | ---: | ---: | ---: |
| NSP-Minnesota | $1.41 | $0.06 | $1.47 |
| PSCo | 1.39 | — | 1.39 |
| SPS | 0.70 | — | 0.70 |
| NSP-Wisconsin | 0.24 | — | 0.24 |
| Earnings from equity method investments — WYCO | 0.03 | — | 0.03 |
| Regulated utility (a) | 3.76 | 0.06 | 3.83 |
| Xcel Energy Inc. and Other | (0.33) | — | (0.33) |
| Total (a) | $3.44 | 0.06 | $3.50 |

| Diluted Earnings (Loss) Per Share | Twelve Months Ended Dec. 31, 2023 GAAP Diluted EPS | Impact of Adjustments | Ongoing Diluted EPS |
| --- | ---: | ---: | ---: |
| NSP-Minnesota | $1.28 | $0.04 | $1.32 |
| PSCo (a) | 1.26 | 0.08 | 1.33 |
| SPS | 0.70 | 0.01 | 0.71 |
| NSP-Wisconsin | 0.25 | — | 0.25 |
| Earnings from equity method investments — WYCO | 0.04 | — | 0.04 |
| Regulated utility (a) | 3.52 | 0.14 | 3.66 |
| Xcel Energy Inc. and Other | (0.31) | — | (0.31) |
| Total (a) | $3.21 | 0.14 | $3.35 |

(a) Amounts may not add due to rounding.

Adjustments to GAAP net income include:

*Sherco Unit 3 2011 Outage Refunds —* NSP-Minnesota’s Sherco Unit 3 experienced an extended outage following a 2011 incident which damaged its turbine. In 2024, following contested case procedures, Xcel Energy recognized a customer refund of $47 million for replacement power incurred during the outage.

*Comanche Unit 3 Litigation —* In the third quarter of 2023, PSCo recognized a non-recurring $34 million charge as a result of a jury verdict in Denver County District Court awarding CORE Electric Cooperative lost power damages and other costs.

*Workforce Reduction —* In 2023, Xcel Energy implemented workforce actions to align resources and investments with our evolving business and customer needs and streamline the organization for long-term success. Xcel Energy initiated a Voluntary Retirement Program, under which approximately 400 eligible non-bargaining employees retired. Xcel Energy also eliminated approximately 150 non-bargaining employees through an involuntary severance program. Workforce reduction expenses of $72 million were recorded in the fourth quarter of 2023.

### Results of Operations

Diluted EPS for Xcel Energy at Dec. 31:

| Diluted Earnings (Loss) Per Share | 2024 | 2023 |
| --- | ---: | ---: |
| NSP-Minnesota | $1.41 | $1.28 |
| PSCo | 1.39 | 1.26 |
| SPS | 0.70 | 0.70 |
| NSP-Wisconsin | 0.24 | 0.25 |
| Earnings from equity method investments — WYCO | 0.03 | 0.04 |
| Regulated utility (a) | 3.76 | 3.52 |
| Xcel Energy Inc. and Other | (0.33) | (0.31) |
| GAAP Diluted EPS (a) | 3.44 | 3.21 |
| Loss on Comanche Unit 3 litigation | — | 0.05 |
| Workforce reduction expenses | — | 0.09 |
| Sherco Unit 3 2011 outage refunds | 0.06 | — |
| Ongoing Diluted EPS (a) | $3.50 | $3.35 |

(a) Amounts may not add due to rounding.

Xcel Energy’s management believes that ongoing earnings reflects management’s performance in operating Xcel Energy and provides a meaningful representation of the performance of Xcel Energy’s core business. In addition, Xcel Energy’s management uses ongoing earnings internally for financial planning and analysis, reporting results to the Board of Directors and when communicating its earnings outlook to analysts and investors.

### 2024 Comparison with 2023

***Xcel Energy —*** GAAP earnings were $3.44 per share compared to $3.21 per share in 2023 and ongoing earnings were $3.50 per share in 2024, compared with $3.35 per share in 2023. The change in EPS was driven by increased recovery of infrastructure investments, partially offset by higher depreciation, interest charges and O&M expenses.

Fluctuations in electric and natural gas revenues associated with changes in fuel and purchased power and/or natural gas sold and transported generally do not significantly impact earnings (changes in costs are offset by the related variation in revenues).

***NSP-Minnesota —*** GAAP earnings increased $0.13 per share and ongoing earnings increased $0.15 per share for 2024 compared to 2023. Ongoing earnings increased due to higher recovery of electric and natural gas infrastructure investments, partially offset by increased depreciation and interest charges.

***PSCo —*** GAAP earnings increased $0.13 per share and ongoing earnings increased $0.06 per share for 2024. Higher ongoing earnings primarily reflects higher recovery of electric and natural gas infrastructure investments, which was partially offset by increased depreciation, O&M and interest charges.

***SPS —*** GAAP earnings were flat and ongoing earnings decreased $0.01 per share for 2024. Ongoing earnings were impacted by increased depreciation, O&M and interest charges, largely offset by regulatory rate outcomes and sales growth.

***NSP-Wisconsin —*** GAAP and ongoing earnings decreased $0.01 per share for 2024. The decrease in ongoing earnings was primarily a result of higher depreciation.

***Xcel Energy Inc. and Other —*** Primarily includes financing costs and interest income at the holding company and earnings from investment funds, which are accounted for as equity method investments. The decline in earnings for 2024 is largely due to higher debt levels and increased interest rates, partially offset by a gain on debt repurchases.

### Changes in Diluted EPS

Components significantly contributing to changes in 2024 EPS compared with 2023:

| Diluted Earnings (Loss) Per Share | Twelve Months Ended Dec. 31 |
| --- | ---: |
| **GAAP diluted EPS — 2023** | **$3.21** |
| Components of change — 2024 vs. 2023 |  |
| Electric regulatory rate outcomes and riders | 0.73 |
| Higher other income, net | 0.16 |
| Natural gas regulatory rate outcomes and riders | 0.14 |
| Workforce reduction expenses | 0.09 |
| Loss on Comanche Unit 3 litigation | 0.05 |
| Higher depreciation and amortization | (0.40) |
| Interest charges, net of AFUDC - debt | (0.24) |
| Higher O&M expenses | (0.13) |
| Sherco Unit 3 2011 outage refunds | (0.06) |
| Other, net | (0.11) |
| **GAAP diluted EPS — 2024** | **$3.44** |
| Sherco Unit 3 2011 outage refunds | 0.06 |
| **Ongoing diluted EPS — 2024** | **$3.50** |

ROE for Xcel Energy and its utility subsidiaries:

| ROE | 2024 GAAP ROE | Ongoing ROE | 2023 GAAP ROE | Ongoing ROE |
| --- | ---: | ---: | ---: | ---: |
| NSP-Minnesota | 9.07% | 9.46% | 8.82% | 9.11% |
| PSCo | 7.63 | 7.63 | 7.32 | 7.77 |
| SPS | 9.57 | 9.57 | 9.80 | 9.98 |
| NSP-Wisconsin | 8.98 | 8.98 | 10.38 | 10.67 |
| Utility Subsidiaries | 8.55 | 8.69 | 8.45 | 8.79 |
| Xcel Energy | 10.42 | 10.61 | 10.33 | 10.79 |

### Statement of Income Analysis

The following summarizes the items that affected the individual revenue and expense items reported in the consolidated statements of income.

***Estimated Impact of Temperature Changes on Regulated Earnings —*** Unusually hot summers or cold winters increase electric and natural gas sales, while mild weather reduces electric and natural gas sales. The estimated impact of weather on earnings is based on the number of customers, temperature variances, the amount of natural gas or electricity historically used per degree of temperature and excludes any incremental related operating expenses that could result due to storm activity or vegetation management requirements. As a result, weather deviations from normal levels can affect Xcel Energy’s financial performance. However, electric sales true-up and gas decoupling mechanisms in Minnesota predominately mitigate the positive and adverse impacts of weather in that jurisdiction.

Degree-day or THI data is used to estimate amounts of energy required to maintain comfortable indoor temperature levels based on each day’s average temperature and humidity.

HDD is the measure of the variation in the weather based on the extent to which the average daily temperature falls below 65° Fahrenheit. CDD is the measure of the variation in the weather based on the extent to which the average daily temperature rises above 65° Fahrenheit.

Each degree of temperature above 65° Fahrenheit is counted as one CDD, and each degree of temperature below 65° Fahrenheit is counted as one HDD.

In Xcel Energy’s more humid service territories, a THI is used in place of CDD, which adds a humidity factor to CDD. HDD, CDD and THI are most likely to impact the usage of Xcel Energy’s residential and commercial customers. Industrial customers are less sensitive to weather.

Normal weather conditions are defined as either the 10, 20 or 30-year average of actual historical weather conditions. The historical period of time used in the calculation of normal weather differs by jurisdiction, based on regulatory practice. To calculate the impact of weather on demand, a demand factor is applied to the weather impact on sales. Extreme weather variations, windchill and cloud cover may not be reflected in weather-normalized estimates.

Percentage increase (decrease) in normal and actual HDD, CDD and THI:

|  | 2024 vs. Normal | 2023 vs. Normal | 2024 vs. 2023 |
| --- | ---: | ---: | ---: |
| HDD | (15.4)% | (7.3)% | (9.8)% |
| CDD | 28.1 | 5.2 | 23 |
| THI | (11.2) | 16.0 | (22.5) |

***Weather —*** Estimated impact of temperature variations on EPS compared with normal weather conditions:

|  | 2024 vs. Normal | 2023 vs. Normal | 2024 vs. 2023 |
| --- | ---: | ---: | ---: |
| Retail electric | $(0.008) | $0.013 | $(0.021) |
| Decoupling and sales true-up | 0.047 | (0.007) | 0.054 |
| Electric total | $0.039 | $0.006 | $0.033 |
| Firm natural gas | (0.070) | (0.010) | (0.060) |
| Decoupling | $0.027 | $0.013 | $0.014 |
| Gas total | $(0.043) | $0.003 | $(0.046) |
| Total | $(0.004) | $0.009 | $(0.013) |

***Sales —*** Sales growth (decline) for actual and weather-normalized sales:

| Actual | 2024 vs. 2023 NSP-Minnesota | PSCo | SPS | NSP-Wisconsin | Xcel Energy |
| --- | ---: | ---: | ---: | ---: | ---: |
| Electric residential | (4.1)% | 3.9% | 0.7% | (3.5)% | (0.4)% |
| Electric C&I | (2.6) | — | 9.3 | (1.9) | 1.7 |
| Total retail electric sales | (3.1) | 1.3 | 7.8 | (2.4) | 1.1 |
| Firm natural gas sales | (8.0) | (6.9) | N/A | (7.5) | (7.2) |

| Weather-normalized | 2024 vs. 2023 NSP-Minnesota | PSCo | SPS | NSP-Wisconsin | Xcel Energy |
| --- | ---: | ---: | ---: | ---: | ---: |
| Electric residential | 0.2% | 0.9% | (1.2)% | (1.5)% | 0.2% |
| Electric C&I | (1.7) | (1.1) | 9.3 | (1.6) | 1.7 |
| Total retail electric sales | (1.1) | (0.4) | 7.4 | (1.5) | 1.3 |
| Firm natural gas sales | (1.1) | 0.6 | N/A | (2.5) | (0.2) |

| Weather-normalized | 2024 vs. 2023 (Leap Year Adjusted) NSP-Minnesota | PSCo | SPS | NSP-Wisconsin | Xcel Energy |
| --- | ---: | ---: | ---: | ---: | ---: |
| Electric residential | (0.1)% | 0.7% | (1.5)% | (1.8)% | (0.1)% |
| Electric C&I | (2.0) | (1.4) | 9.0 | (1.8) | 1.5 |
| Total retail electric sales | (1.4) | (0.7) | 7.1 | (1.8) | 1.0 |
| Firm natural gas sales | (1.7) | — | N/A | (3.1) | (0.7) |

### Annual weather-normalized and leap year adjusted electric sales growth (decline)

- NSP-Minnesota — Residential sales declined due to a 1.5% decrease in use per customer, partially offset by a 1.4% increase in customers. The decline in C&I sales was due to lower use per customer, particularly in the manufacturing sector.
- PSCo — Residential sales increased due to a 1.4% increase in customers, partially offset by a 0.7% decrease in use per customer. The decline in C&I sales was attributable to decreased use per customer, particularly in the wholesale trade and mining.
- SPS — Residential sales declined due to a 2.2% decrease in use per customer partially offset by a 0.7% increase in customers. C&I sales increased due to higher use per customer, primarily driven by the energy sector and cryptocurrency mining.
- NSP-Wisconsin — Residential sales declined due to a 2.7% decrease in use per customer, offset by a 1.0% increase in customers. The C&I sales decline was associated with lower use per customer, experienced particularly in the professional services and manufacturing sectors.

### Annual weather-normalized and leap year adjusted natural gas sales growth (decline)

- Natural gas sales reflect 1.7% residential use per customer and 1.4% C&I use per customer decreases. Partially offsetting these were increased residential and C&I customers in all jurisdictions.

### Electric Revenues

Electric revenues are impacted by changing sales, fluctuations in the price of natural gas, coal and uranium, regulatory outcomes, market prices and seasonality. In addition, electric customers receive a credit for PTCs generated (wind, nuclear and solar), which reduce electric revenue and income taxes.

| (Millions of Dollars) | 2024 vs. 2023 |
| --- | ---: |
| Recovery of lower cost of electric fuel and purchase power | (479) |
| PTCs flowed back to customers (offset by lower ETR) | (302) |
| Wholesale generation revenues | (96) |
| Sherco Unit 3 2011 outage refunds | (47) |
| Regulatory rate outcomes (MN, CO, TX, and NM) | 372 |
| Non-fuel riders | 169 |
| Conservation and demand side management (offset in expense) | 102 |
| Estimated impact of weather (net of sales true-up) | 24 |
| Other, net | (42) |
| Total decrease | $(299) |

27

### Natural Gas Revenues

Natural gas revenues vary with changing sales, the cost of natural gas and regulatory outcomes.

| (Millions of Dollars) | 2024 vs. 2023 |
| --- | ---: |
| Recovery of lower cost of natural gas | $(496) |
| Estimated impact of weather (net of decoupling) | (35) |
| Retail sales decline (net of decoupling) | (1) |
| Regulatory rate outcomes (MN, WI, CO, and ND) | 91 |
| Infrastructure and integrity riders | 8 |
| Other, net | 18 |
| Total decrease | $(415) |

***Electric Fuel and Purchased Power —*** Expenses incurred for electric fuel and purchased power are impacted by fluctuations in market prices of natural gas, coal and uranium, as well as seasonality. These incurred expenses are generally recovered through various regulatory recovery mechanisms. As a result, changes in these expenses are largely offset in operating revenues and have minimal earnings impact.

Electric fuel and purchased power expenses decreased $490 million in 2024. The decrease is primarily due to timing of fuel recovery mechanisms and lower commodity prices, partially offset by increased volumes.

***Cost of Natural Gas Sold and Transported —*** Expenses incurred for the cost of natural gas sold are impacted by market prices and seasonality. These costs are generally recovered through various regulatory recovery mechanisms. As a result, changes in these expenses are largely offset in operating revenues and have minimal earnings impact.

Natural gas sold and transported decreased $505 million in 2024. The decrease is primarily due to lower commodity prices and volumes.

### Non-Fuel Operating Expenses and Other Items

***O&M Expenses —*** O&M expenses increased $96 million in 2024 primarily due to operational activities, including generation maintenance, storm response, wildfire mitigation costs and damage prevention. The impact of prior year regulatory deferrals also contributed to increased O&M expenses, partially offset by lower labor and benefit costs and lower bad debt expenses.

***Depreciation and Amortization —*** Depreciation and amortization increased $296 million for the year, primarily related to system expansion, partially offset by the impacts of various rate cases, including recognition of previously deferred costs as well as wind and nuclear life extensions.

***Other Income —*** Other income increased $121 million for the year, primarily related to interest earned on significant cash balances throughout the year and a gain on debt repurchases, which helped to offset increased spending in our electric and natural gas operations to reduce risk, including wildfire mitigation.

***Interest Charges —*** Interest charges increased $200 million in 2024. The increase was largely due to higher long-term debt levels to fund capital investments and higher interest rates.

***AFUDC, Equity and Debt —*** AFUDC increased $99 million in 2024. This increase was largely due to increased investment in renewable and transmission projects.

### Xcel Energy Inc. and Other Results

Net income and diluted EPS contributions of Xcel Energy Inc. and its nonregulated businesses:

| (Millions of Dollars) | 2024 | 2023 |
| --- | ---: | ---: |
| Xcel Energy Inc. financing costs | $(223) | $(174) |
| Xcel Energy Inc. taxes and other results (a) | 38 | 1 |
| Total Xcel Energy Inc. and other costs | $(185) | $(173) |

| (Diluted Earnings (Loss) Per Share) | 2024 | 2023 |
| --- | ---: | ---: |
| Xcel Energy Inc. financing costs | $(0.40) | $(0.32) |
| Xcel Energy Inc. taxes and other results (a) | 0.07 | 0.01 |
| Total Xcel Energy Inc. and other costs | $(0.33) | $(0.31) |

(a) Amounts include gain from open market debt repurchases in 2024.

Xcel Energy Inc.’s results include interest charges, which are incurred at Xcel Energy Inc. and are not directly assigned to individual subsidiaries.

### 2023 Comparison with 2022

A discussion of changes in Xcel Energy’s results of operations, cash flows and liquidity and capital resources from the year ended Dec. 31, 2022 to Dec. 31, 2023 can be found in Part II, “Item 7, Management’s Discussion and Analysis of Financial Condition and Results of Operations” of our Annual Report on Form 10-K for the fiscal year 2023, which was filed with the SEC on Feb. 21, 2024. However, such discussion is not incorporated by reference into, and does not constitute a part of, this Annual Report on Form 10-K.

### Public Utility Regulation

The FERC and various state and local regulatory commissions regulate Xcel Energy Inc.’s utility subsidiaries and West Gas Interstate. Xcel Energy is subject to rate regulation by state utility regulatory agencies, which have jurisdiction with respect to the rates of electric and natural gas distribution companies in Minnesota, North Dakota, South Dakota, Wisconsin, Michigan, Colorado, New Mexico and Texas.

Rates are designed to recover plant investment, operating costs and an allowed return on investment. Our utility subsidiaries request changes in utility rates through commission filings. Changes in operating costs can affect Xcel Energy’s financial results, depending on the timing of rate cases and implementation of final rates. Other factors affecting rate filings are new investments, sales, conservation and DSM efforts, and the cost of capital.

In addition, the regulatory commissions authorize the ROE, capital structure and depreciation rates in rate proceedings. Decisions by these regulators can significantly impact Xcel Energy’s results of operations and credit quality.

See Rate Matters and Other within Note 12 to the consolidated financial statements for further information.

### NSP-Minnesota

### Summary of Regulatory Agencies / RTO and Areas of Jurisdiction

| Regulatory Body / RTO | Additional Information |
| --- | --- |
| MPUC | Retail rates, services, security issuances, property transfers, mergers, disposition of assets, affiliate transactions, and other aspects of electric and natural gas operations. Reviews and approves Integrated Resource Plans for meeting future energy needs. Certifies the need and siting for generating plants greater than 50 MW and transmission lines greater than 100 KV in Minnesota. Reviews and approves natural gas supply plans. |
| NDPSC | Retail rates, services and other aspects of electric and natural gas operations. Reviews and approves Integrated Resource Plans for meeting future energy needs. Regulatory authority over generation and transmission facilities, along with the siting and routing of new generation and transmission facilities in North Dakota. Pipeline safety compliance. |
| SDPUC | Retail rates, services and other aspects of electric operations. Regulatory authority over generation and transmission facilities, along with the siting and routing of new generation and transmission facilities in South Dakota. Pipeline safety compliance. |
| FERC | Wholesale electric operations, hydroelectric licensing, accounting practices, wholesale sales for resale, transmission of electricity in interstate commerce, compliance with NERC electric reliability standards, asset transfers and mergers, and natural gas transactions in interstate commerce. |
| MISO | NSP-Minnesota is a transmission owning member of the MISO RTO and operates within the MISO RTO and wholesale markets. NSP-Minnesota makes wholesale sales in other RTO markets at market-based rates. NSP-Minnesota and NSP-Wisconsin also make wholesale electric sales at market-based prices to customers outside of their balancing authority as jointly authorized by the FERC. |
| DOT | Pipeline safety compliance. |
| Minnesota Office of Pipeline Safety | Pipeline safety compliance. |

### Recovery Mechanisms

| Mechanism | Additional Information |
| --- | --- |
| CIP Rider | Recovers costs of conservation and DSM programs. Minnesota state law requires NSP-Minnesota to spend 2% of its state electric revenues and 0.5% of its state natural gas revenues on CIP. These costs are recovered through an annual cost-recovery mechanism. |
| Customer Protection Mechanisms | MISO capacity revenue tracker, property tax tracker, annual incentive plan, capital true-up, deferred tax asset refund and credit card fee tracker are all mechanisms that mitigate the impact of changes to costs as compared to a baseline for NSP-Minnesota customers. |
| Decoupling | Measures natural gas revenues against a baseline revenue per-customer for all Minnesota gas customers in classes with more than 50 customers. |
| FCA | Recovers prudently incurred costs of fuel related items and purchased energy (Minnesota, North Dakota and South Dakota). |
| Gas Utility Infrastructure Cost Rider | Recovers costs for transmission and distribution pipeline integrity management programs, including funding for pipeline assessments, deferred costs for sewer separation and pipeline integrity management programs in Minnesota. |
| Infrastructure Rider | Recovers costs for investments in generation in South Dakota. |
| Purchased Gas Adjustment | Provides for prospective monthly rate adjustments in Minnesota and North Dakota for costs of purchased natural gas, transportation and storage service. Includes a true-up process for difference between projected and actual costs. |
| Renewable Development Fund Rider | Allocates money collected from customers to support research and development of emerging renewable energy projects and technologies in Minnesota. |
| Renewable Energy Rider | Recovers cost of renewable generation in North Dakota. |
| RES Rider | Recovers cost of renewable generation in Minnesota. |
| Sales True-up | Mitigates the impact of changes to sales levels as compared to a baseline for all Minnesota electric customers. |
| State Energy Policy Electric Rider | Recovers costs associated with the Prairie Island Legislation settlement and the Reliability Administrator/ Sustainable Building Guidelines in Minnesota. |
| Transmission Cost Recovery Rider | Recovers costs for investments in Minnesota, North Dakota, and South Dakota for electric transmission and distribution grid modernization. |

### Pending and Recently Concluded Regulatory Proceedings

*2024 Minnesota Natural Gas Rate Case —* In November 2023, NSP-Minnesota filed a request with the MPUC for a natural gas rate increase of approximately $59 million, or 9.6%.

In June 2024, NSP-Minnesota and various parties filed an uncontested settlement, which includes the following terms:

- Natural gas rate increase of $46 million, or 7.5%.
- ROE of 9.6%.
- Equity ratio of 52.5%.
- Rate base of $1.25 billion.
- No change to Commission approved decoupling.

In October 2024, an ALJ recommended the MPUC approve the rate case settlement. In February 2025, the MPUC verbally approved the settlement agreement. NSP-Minnesota expects to implement a rate increase of $50 million (trued up for 2024 weather normalized actual sales) in July 2025.

*2024 North Dakota Natural Gas Rate Case —* In December 2023, NSP-Minnesota filed a request with the NDPSC seeking an increase in natural gas rates of $8.5 million (9.4%), based on a ROE of 10.20%, an equity ratio of 52.5%, 2024 test year and rate base of $168 million.

In November 2024, the NDPSC approved a settlement, reflecting a natural gas rate increase of $7.2 million (8.0%), based on a ROE of 9.9% and an equity ratio of 52.5%. Rates were implemented on Jan. 1, 2025.

*2022 Minnesota Electric Rate Case —* In October 2021, NSP-Minnesota filed a three-year electric rate case with the MPUC.

In July 2023, the MPUC approved a three-year rate increase of approximately $332 million for 2022-2024, based on a ROE of 9.25% and an equity ratio of 52.5%. The MPUC also approved a continuation of the sales true-up mechanism.

In November 2023, NSP-Minnesota filed an appeal to the Minnesota Court of Appeals regarding MPUC decisions relating to executive compensation, insurance expense and treatment of prepaid pension assets.

In January 2025, the Court issued its opinion, which upheld the commission's determination on insurance expense, but reversed and remanded the executive compensation and prepaid pension asset decisions back to the MPUC. The opinion is currently pending further action from the MPUC.

*2024 Minnesota Electric Rate Case —* In November 2024, NSP-Minnesota filed an electric rate case in Minnesota, seeking a total revenue increase of $491 million (13.2%) over two years, based on an ROE of 10.3%, a 52.5% equity ratio and rate base of $13.2 billion in 2025 and $14 billion in 2026. NSP-Minnesota also requested interim rates of $224 million for 2025. In December 2024, the MPUC reduced the interim rate request for wildfire mitigation costs (as these costs were deemed as new costs not previously approved in a rate case) and approved interim rates of $192 million, effective January 1, 2025. A decision is expected in 2026.

*2024 North Dakota Electric Rate Case —* In December 2024, NSP-Minnesota filed a request with the NDPSC for an annual electric rate increase of approximately $45 million, or 19.3% over current rates established in 2021. The filing is based on a 2025 forecast test year and includes a requested ROE of 10.3%, rate base of approximately $817 million and an equity ratio of 52.5%. In January 2025, the NDPSC approved interim rates, subject to refund, of approximately $27 million (implemented on Feb. 1, 2025).

### Nuclear Power Operations

Nuclear power plant operations produce gaseous, liquid and solid radioactive wastes, which are covered by federal regulation. High-level radioactive wastes primarily include used nuclear fuel. Low-level waste consists primarily of demineralizer resins, paper, protective clothing, rags, tools and equipment contaminated through use.

*NRC Regulation —* The NRC regulates nuclear operations. Costs of complying with NRC requirements can affect both operating expenses and capital investments of the plants. NSP-Minnesota has obtained recovery of these compliance costs and expects to recover future compliance costs.

Low-Level Waste Disposal — Low level waste from Monticello and Prairie Island is disposed of at the Clive facility located in Utah and the Waste Control Specialists facility in Texas. NSP-Minnesota has storage capacity available on-site through 2033 at Prairie Island Unit 1, 2034 at Prairie Island Unit 2, and 2040 at Monticello, which would allow both plants to continue to operate if off-site low-level waste disposal facilities become unavailable.

*High-Level Radioactive Waste Disposal —* The federal government has responsibility to permanently dispose of domestic spent nuclear fuel and other high-level radioactive wastes. The Nuclear Waste Policy Act requires the DOE to implement a program for nuclear high-level waste management.

This includes the siting, licensing, construction and operation of a repository for spent nuclear fuel from civilian nuclear power reactors and other high-level radioactive wastes at a permanent federal storage or disposal facility. Currently, there are no definitive plans for a permanent federal storage facility site.

*Nuclear Spent Fuel Storage —* NSP-Minnesota has interim on-site storage for spent nuclear fuel at its Monticello and Prairie Island nuclear generating plants. Authorized storage capacity is sufficient to allow NSP-Minnesota to operate until 2040 for Monticello, 2033 for Prairie Island Unit 1, and 2034 for Prairie Island Unit 2.

In December 2024, the NRC approved a Subsequent License Renewal application for extended Monticello Plant operation through 2050 (Subsequent Renewed Facility Operating License No. DPR-22, Accession No. ML24310A345). NSP-Minnesota will need authorization from the MPUC for additional storage capacity through 2050.

In February 2024, NSP-Minnesota filed a CON with the MPUC for additional storage at Prairie Island to support possible life extension to 2054. NSP-Minnesota has notified the NRC of intent to apply for Prairie Island SLR which would extend operation of Unit 1 to 2053 and Unit 2 to 2054.

Authorizations for additional spent fuel storage capacity may be required at each site to support either continued operation or decommissioning if the federal government does not commence storage operations.

### NSP-Wisconsin

### Summary of Regulatory Agencies / RTO and Areas of Jurisdiction

| Regulatory Body / RTO | Additional Information |
| --- | --- |
| PSCW | Retail rates, services and other aspects of electric and natural gas operations. Certifies the need for new generating plants and electric transmission lines before the facilities may be sited and built. The PSCW has a biennial base rate filing requirement. By June of each odd numbered year, NSP-Wisconsin must submit a rate filing for the test year beginning the following January. Pipeline safety compliance. |
| MPSC | Retail rates, services and other aspects of electric and natural gas operations. Certifies the need for new generating plants and electric transmission lines before the facilities may be sited and built. Pipeline safety compliance. |
| FERC | Wholesale electric operations, hydroelectric generation licensing, accounting practices, wholesale sales for resale, transmission of electricity in interstate commerce, compliance with NERC electric reliability standards, asset transactions and mergers and natural gas transactions in interstate commerce. |
| MISO | NSP-Wisconsin is a transmission owning member of the MISO RTO that operates within the MISO RTO and wholesale energy market. NSP-Wisconsin and NSP-Minnesota are jointly authorized by the FERC to make wholesale electric sales at market-based prices. |
| DOT | Pipeline safety compliance. |

30

### Recovery Mechanisms

| Mechanism | Additional Information |
| --- | --- |
| Annual Fuel Cost Plan | NSP-Wisconsin does not have an automatic electric fuel adjustment clause. Under Wisconsin rules, utilities submit a forward-looking annual fuel cost plan to the PSCW. Once the PSCW approves the plan, utilities defer the amount of any fuel cost under-recovery or over-recovery in excess of a 2% annual tolerance band, for future rate recovery or refund. Approval of a fuel cost plan and any rate adjustment for refund or recovery of deferred costs is determined by the PSCW. Rate recovery of deferred fuel cost is subject to an earnings test based on the most recently authorized ROE. Under-collections that exceed the 2% annual tolerance band may not be recovered if the utility earnings for that year exceed the authorized ROE. |
| Natural Gas Cost-Recovery Factor (MI) | NSP-Wisconsin’s natural gas rates for Michigan customers include a natural gas cost-recovery factor, based on 12-month projections and trued-up to actual amounts on an annual basis. |
| Power Supply Cost Recovery Factors | NSP-Wisconsin’s retail electric rate schedules for Michigan customers include power supply cost recovery factors, based on 12-month projections. After each 12-month period, a reconciliation is submitted whereby over-recoveries are refunded and any under-recoveries are collected from customers. |
| Purchased Gas Adjustment | A retail cost-recovery mechanism to recover the actual cost of natural gas, transportation, and storage services. |
| Wisconsin Energy Efficiency Program | The primary energy efficiency program is funded by the utilities, but operated by independent contractors subject to oversight by the PSCW and utilities. NSP-Wisconsin recovers these costs from customers. |

### Pending Regulatory Proceedings

*Michigan Electric Rate Case —* In July 2024, NSP-Wisconsin filed a Michigan electric rate case with the MPSC. In December 2024, the MPSC approved NSP-Wisconsin’s settlement agreement. The settlement order includes an electric rate increase of $1.75 million in 2025 and a step increase of $0.55 million in 2026, based on a ROE of 9.8% and an equity ratio of 50%.

*Wisconsin 2025 Stay-Out Proposal —* In June 2024, NSP-Wisconsin filed a 2025 stay-out proposal with the PSCW. In December 2024, the PSCW approved NSP-Wisconsin’s filing, which offsets $27 million in electric deficiencies and $3 million in natural gas deficiencies by amortizing IRA deferrals, stopping a deferral related to IRA benefits ordered in a previous rate case, and deferring revenue requirement impacts of two natural gas capital projects.

*Excess Liability Insurance Deferral –* In February 2025, NSP-Wisconsin filed a request with the PSCW for deferred accounting treatment for excess liability insurance expense of $9.6 million incurred as a result of the October 2024 policy renewal. A PSCW decision is expected in the third quarter of 2025.

### NSP System

### Pending and Recently Concluded Regulatory Proceedings

*Resource Acquisition —* In February 2024, NSP filed its Upper Midwest Resource Plan with the MPUC. In October 2024, NSP-Minnesota filed a settlement with several parties reaching agreement on the resource plan, as well as the proposed projects to be approved in the pending 800 MW firm dispatchable resource acquisition.

In February 2025, the MPUC verbally approved the terms of the settlement agreement, including:

- The selection of the company owned 420 MW Lyon County combustion turbine.
- The selection of the company owned 300 MW 4-hour Sherco battery energy storage system.
- Multiple PPAs to proceed to the negotiation stage.
- The addition of 3,200 MW of wind, 400 MW of solar and 600 MW of stand-alone storage to be added through 2030 based on an RFP process (a portion of which is expected to be fulfilled with the resources acquired as part of the 2024 RFPs). Of these amounts, approximately 2,800 MW of wind are projected to utilize the Minnesota Energy Connection transmission line.
- Planned life extensions of the Prairie Island and Monticello nuclear plants through the early 2050s.

Additionally, the MPUC approved life extensions of the Red Wing and Mankato RDF plants to 2037 and ordered NSP-Minnesota to file a proposed tariff for customers with super-large load, largely data centers, by July 15, 2025.

NSP-Minnesota will file additional RFPs for approved resource needs beginning in late 2025 or early 2026.

NSP-Minnesota and NSP-Wisconsin are actively engaged in multiple processes and proceedings to acquire resources to meet their identified generation resource needs.

- In October 2023, NSP-Minnesota issued an RFP seeking 1,200 MW of wind assets to replace capacity and reutilize interconnection rights associated with the retiring Sherco coal facilities. The RFP closed in December 2023. NSP-Minnesota expects to file for approval of recommended projects in summer 2025.
- In 2024, NSP-Minnesota and NSP-Wisconsin each issued an RFP collectively seeking up to 1,600 MW of wind, solar, storage or hybrid resources to interconnect to the NSP System, including reutilization of the interconnection rights associated with the retiring Sherco coal units, and 650 MW of solar and storage resources to specifically reutilize the interconnection rights associated with the retiring King coal unit. Bids are currently under evaluation; NSP-Minnesota and NSP-Wisconsin announced the short listed projects in January 2025 and plan to file for the requisite approvals of the selected resources with the MPUC and PSCW, respectively, in the second half of 2025.

### Purchased Power and Transmission Services

The NSP System expects to use power plants, power purchases, conservation and DSM options, new generation facilities and expansion of power plants to meet its system capacity requirements.

*Purchased Power —* Through the Interchange Agreement, NSP-Wisconsin receives power purchased by NSP-Minnesota from other utilities and independent power producers. Long-term purchased power contracts for dispatchable resources typically require a capacity charge and an energy charge. NSP-Minnesota makes short-term purchases to meet system requirements, replace company owned generation, meet operating reserve obligations or obtain energy at a lower cost.

*Purchased Transmission Services —* NSP-Minnesota and NSP-Wisconsin have contracts with MISO and other regional transmission service providers to deliver power and energy to their customers.

### Wholesale and Commodity Marketing Operations

NSP-Minnesota conducts wholesale marketing operations, including the purchase and sale of electric capacity, energy, ancillary services and energy-related products. NSP-Minnesota uses physical and financial instruments to minimize commodity price risk and to hedge sales and purchases.

NSP-Minnesota also engages in trading activity unrelated to these hedging activities. Sharing of any margins is determined through state regulatory proceedings as well as the operation of the FERC approved joint operating agreement. NSP-Minnesota and NSP-Wisconsin do not serve any wholesale requirements customers at cost-based regulated rates.

### PSCo

### Summary of Regulatory Agencies / RTO and Areas of Jurisdiction

| Regulatory Body / RTO | Additional Information on Regulatory Authority |
| --- | --- |
| CPUC | Retail rates, accounts, services, issuance of securities and other aspects of electric, natural gas and steam operations. Reviews and approves Integrated Resource Plans for meeting future energy needs. Certifies the need and siting for generating plans greater than 50 MW. Pipeline safety compliance. |
| FERC | Wholesale electric operations, accounting practices, hydroelectric licensing, wholesale sales for resale, transmission of electricity in interstate commerce, compliance with the NERC electric reliability standards, asset transactions and mergers and natural gas transactions in interstate commerce. Wholesale electric sales at cost-based prices to customers inside PSCo’s balancing authority area and at market-based prices to customers outside PSCo’s balancing authority area. PSCo holds a FERC certificate that allows it to transport natural gas in interstate commerce without PSCo becoming subject to full FERC jurisdiction. |
| RTO | PSCo is not presently a member of an RTO and does not operate within an RTO energy market. However, PSCo does make certain sales to other RTO’s, including SPP and participates in the SPP Western Energy Imbalance Service market, an energy imbalance market. |
| DOT | Pipeline safety compliance. |

### Recovery Mechanisms

| Mechanism | Additional Information |
| --- | --- |
| Colorado Energy Plan Adjustment | Recovers the early retirement costs of Comanche Units 1 and 2 to a maximum of 1% of the customer’s bill. |
| DSM Cost Adjustment | Recovers electric and gas DSM, interruptible service costs and performance incentives for achieving energy savings goals. |
| Electric Commodity Adjustment | Recovers fuel and purchased energy costs. Short-term sales margins are shared with customers. PTCs earned for owned wind generation are returned to customers. |
| FCA | PSCo recovers fuel and purchased energy costs from wholesale electric customers through a fuel cost adjustment clause approved by the FERC. Wholesale customers pay production costs through a forecasted formula rate subject to true-up. |
| GCA | Recovers costs of purchased natural gas and transportation and is revised quarterly to allow for changes in natural gas rates. |
| Purchased Capacity Cost Adjustment | Recovers purchased capacity payments. |
| RES Adjustment | Recovers the incremental costs of compliance with the RES with a maximum of 1% of the customer’s bill. |
| Steam Cost Adjustment | Recovers fuel costs to operate the steam system. The Steam Cost Adjustment rate is revised quarterly. |
| Transmission Cost Adjustment | Recovers costs between rate cases for transmission projects that result in a net increase in capacity or are part of an approved wildfire mitigation plan. Distribution projects are recoverable for 2024 and 2025, subject to a cap of 0.5% and 1.25% of electric retail revenues, respectively. |
| Transportation Electrification Plan | Recovers costs associated with the investment in and adoption of transportation electrification infrastructure. |

### Pending and Recently Concluded Regulatory Proceedings

*Colorado Natural Gas Rate Case —* In January 2024, PSCo, filed a request with the CPUC seeking an increase to retail natural gas rates of $171 million (9.5%). The request was based on a 10.25% ROE, an equity ratio of 55%, a 2023 test year and a $4.2 billion year-end rate base.

In October 2024, as modified on ARRR in January 2025, the CPUC issued an order including the following key decisions:

- Use of a historic 2023 test year, with a 13-month average rate base.
- Weighted-average cost of capital of 7.0%, based on an ROE range of 9.2%-9.5% and an equity ratio range of 52%-55%.
- Acceleration of $15 million per year of depreciation expense (incremental to PSCo’s original rate request), to be held in an external trust for future decommissioning costs.
- Modifications to recoverability of certain operating expenses.
- Denial of PSCo’s decoupling proposal.

PSCo placed new rates into effect in November, as modified on ARRR in February 2025, with an annual revenue increase of approximately $125 million, inclusive of $15 million of accelerated depreciation. The UCA filed a second ARRR in February 2025, which remains pending.

*Colorado Resource Plan —* In December 2023, the CPUC approved a portfolio of 5,835 MW, which includes approximately 3,100 MW of company owned resources and 2,700 MW of PPAs.

In December 2023, the CPUC approved a framework for two PIMs associated with the generation projects in the portfolio — a PIM related to capital construction costs and another related to ongoing levelized energy costs with details to be further defined via subsequent proceedings throughout 2024. In September 2024, PSCo filed a proposal for implementation of the PIMs. Intervenor testimony is due Feb. 27, 2025, with a final decision expected in summer 2025.

In September 2024, PSCo filed a proposed framework for CPUC review of pricing adjustments for both company owned and PPA resources to enable delivery of the approved portfolio in light of supply chain and geopolitical developments. In January 2025, the CPUC issued a decision granting limited potential pricing relief, subject to evaluation in future CPCN proceedings for company owned projects.

PSCo filed or expects to file generation and transmission CPCNs throughout 2024 and 2025.

*2024 Colorado Electric Resource Plan —* In October 2024, PSCo filed its electric resource plan with the CPUC. The filing reflects the expected growth on the system, the generation resources needed to meet the projected growth and the future evaluation of competitive bids for new generation resources.

- The plan reflects a base sales forecast with 7% compound annual sales growth through 2031.
- The plan also presents a low sales forecast with a 3% compound annual sales growth through 2031.
- The resource plan includes forecasted need of 5-14 GW of new generation capacity through 2031, including renewables and firm dispatchable resources to meet the two different scenarios. The acquisitions of generation resources will be determined through a competitive solicitation after the CPUC determines the portfolio. The table below summarizes two of the proposed portfolios based on the different sales scenarios:

| (MW) | Base Plan | Low Load |
| --- | ---: | ---: |
| Wind | 7,250 | 2,800 |
| Solar | 3,077 | 1,200 |
| Natural gas combustion turbine | 1,575 | 1,400 |
| Storage (long duration) | 1,600 | — |
| Other storage | 450 | — |
| **Total** | 13,952 | 5,400 |

The procedural schedule is as follows:

- Answer testimony: April 18, 2025
- Rebuttal testimony: May 23, 2025
- Settlement deadline: June 2, 2025
- Hearing: June 10-20, 2025
- Statements of position: July 14, 2025

A CPUC decision on the resource plan is expected by the fall of 2025 (Phase I) with the competitive solicitation for resource additions expected in early 2026.

*Wildfire Mitigation Plan —* In June 2024, PSCo filed an updated WMP and request for recovery of costs covering the years 2025 to 2027 with the CPUC. The estimated total cost for this plan is approximately $1.9 billion. A CPUC decision is expected in the third quarter of 2025.

The WMP integrates industry experience; incorporates evolving risk assessment methodologies; adds new technology; and expands the scope, pace and scale of our work to reduce wildfire risk in a comprehensive and efficient manner under four core programs that include the following:

- Situational awareness — Meteorology, area risk mapping and modeling, artificial intelligence cameras and continuous monitoring.
- Operational mitigations – Enhanced powerline safety settings and PSPS.
- System resiliency — Asset assessment and remediations, pole replacements, line rebuilds, targeted undergrounding and vegetation management.
- Customer support — Coordination and real-time data sharing with customers and other stakeholders and PSPS resiliency rebates.

In February 2025, six of the nine intervenors filed answer testimony in the proceeding. Intervenors provided a range of recommendations related to both the scope of proposed work and the cost recovery proposal.

The remaining procedural schedule is as follows:

- Rebuttal testimony: March 21, 2025
- Settlement deadline: April 11, 2025
- Hearing: May 5-15, 2025
- Decision deadline: Aug. 28, 2025

*Colorado Senate Bill 23-291 —* In May 2023, Colorado Senate Bill 23-291 was signed into law. The bill includes a number of topics including natural gas and electric fuel incentive mechanisms, natural gas planning rules, regulatory filing requirements, and non-recovery of certain expenses (e.g., certain organizational or membership dues, tax penalties or fines).

In November 2023, the CPUC approved PSCo’s natural gas price risk plan to manage customer bill volatility from commodity price changes, establishing upper and lower limits for changes in the GCA rate. As a result, costs above the upper limit are deferred for future recovery, with interest, and costs below the lower limit deferred as a reserve against future cost increases.

The legislation also calls for the CPUC to adopt rules to establish fuel cost mechanisms to align the financial incentives of a utility with the interests of the utility’s customers.

In December 2024, the CPUC adopted final rules applicable to PSCo’s natural gas utility that would assign to the Company four percent of the change in the price per MMbtu of natural gas compared to the three-year average, subject to rolling 12-month cap based on a percentage of rate base, currently estimated at $7 million. The rules require PSCo to make a filing to implement the mechanism within sixty days of becoming effective, expected later in 2025.

In December 2024, the CPUC also adopted rules for electric utilities but did not adopt a specific PIM framework, which will be further considered through additional proceedings in 2025.

*Colorado Senate Bill 24-218 —* In May 2024, Colorado Senate Bill 24-218 was signed into law. The bill includes a suite of policy changes to accelerate investment in electric distribution, including a framework to develop distribution planning and performance requirements and the opportunity for current cost recovery through a rider for distribution investments. In July 2024 and December 2024, the CPUC approved PSCo’s request to collect $17 million and $48 million through a rider, over the remainder of 2024 and 2025, respectively, subject to true-up, associated with forecasted capital investments covered by the new legislation.

*Excess Liability Insurance Deferral —* In August 2024, PSCo filed a request with the CPUC to establish a tracker to defer differences in excess liability insurance premiums after the October 2024 policy renewal (reflecting significantly rising premiums of approximately $40 million, largely associated with wildfire risks throughout the United States) and amounts currently recovered. In January 2025, the CPUC approved a one-year deferral aligned with the current insurance policy year. Cost recovery for incremental insurance premiums will be reviewed in a future rate case.

### Purchased Power and Transmission Service Providers

PSCo meets its system capacity and energy requirements through its fleet of owned and purchased electric generation resources and, when required, the use of demand-side management programs.

*Purchased Power —* PSCo purchases power from other utilities, energy marketers and independent power producers. Long-term purchased power contracts for dispatchable resources typically require capacity and energy charges. Much of PSCo’s long-term purchased power is for wind, solar and storage resources. PSCo makes short-term purchases to meet system load and energy requirements, replace generation out of service for maintenance, meet operating reserve obligations, or obtain energy at a lower cost.

*Purchased Transmission Services —* In addition to using its own transmission system, PSCo has contracts with regional transmission service providers to deliver energy to its customers.

### Wholesale and Commodity Marketing Operations

PSCo conducts various wholesale marketing operations, including the purchase and sale of electric capacity, energy, ancillary services and energy related products. PSCo uses physical and financial instruments to minimize commodity price risk and hedge sales and purchases. PSCo also engages in trading activity unrelated to these hedging activities.

Sharing of any margin is determined through state regulatory proceedings as well as the operation of the FERC approved joint operating agreement.

### SPS

### Summary of Regulatory Agencies / RTO and Areas of Jurisdiction

| Regulatory Body / RTO | Additional Information |
| --- | --- |
| PUCT | Retail electric operations, rates, services, construction of transmission or generation and other aspects of SPS’ electric operations. The municipalities in which SPS operates in Texas have original jurisdiction over rates in those communities. The municipalities’ rate setting decisions are subject to PUCT review. |
| NMPRC | Retail electric operations, retail rates and services and the construction of transmission or generation. Reviews Integrated Resource Plans for meeting future energy needs. |
| FERC | Wholesale electric operations, accounting practices, wholesale sales for resale, the transmission of electricity in interstate commerce, compliance with NERC electric reliability standards, asset transactions and mergers, and natural gas transactions in interstate commerce. |
| SPP RTO and SPP Integrated and Wholesale Markets | SPS is a transmission owning member of the SPP RTO and operates within the SPP RTO and SPP integrated and wholesale markets. SPS is authorized to make wholesale electric sales at market-based prices. |
| DOT | Pipeline safety compliance. |

### Recovery Mechanisms

| Mechanism | Additional Information |
| --- | --- |
| Advanced Metering System Surcharge | Recovers costs incurred in deployment of the Advanced Metering System in Texas. |
| Consulting Fee Rider | Recovers consulting fees and carrying charges incurred by SPS on behalf of the PUCT. |
| Distribution Cost Recovery Factor | Recovers distribution costs not included in rates in Texas. |
| Electric Vehicle Rider | Recovers costs of the Transportation Electrification Plan in New Mexico. |
| Energy Efficiency Cost Recovery Factor | Recovers costs for energy efficiency programs in Texas. |
| Energy Efficiency Rider | Recovers costs for energy efficiency programs in New Mexico. |
| Fixed Fuel and Purchased Recovery Factor | Provides for the over- or under-recovery of energy expenses in Texas. Regulations require refunding or surcharging over- or under- recovery amounts, including interest, when they exceed 4% of the utility’s annual fuel and purchased energy costs on a rolling 12-month basis if this condition is expected to continue. |
| Fuel and Purchased Power Cost Adjustment Clause | Adjusts monthly to recover actual fuel and purchased power costs in New Mexico. |
| Grid Modernization Rider | Recovers costs incurred in the implementation of Grid Modernization Components in New Mexico. |
| Renewable Portfolio Standards | Recovers deferred costs for renewable energy programs in New Mexico. |
| Transmission Cost Recovery Factor | Recovers certain transmission infrastructure improvement costs and changes in wholesale transmission charges not included in Texas base rates. |
| Wholesale Fuel and Purchased Energy Cost Adjustment | SPS recovers fuel and purchased energy costs from its wholesale customers through a monthly wholesale fuel and purchased energy cost adjustment clause accepted by the FERC. Wholesale customers also pay the jurisdictional allocation of production costs. |

### Pending and Recently Concluded Regulatory Proceedings

*2023 Texas Electric Rate Case —* In 2023, SPS filed an electric rate case with the PUCT seeking an increase in base rate revenue of $158 million (14%). Interim rates went into effect on Feb. 1, 2024. In April 2024, the PUCT approved a black box settlement between SPS and intervening parties, which reflect the following terms:

- A base rate increase of $65 million effective back to July 13, 2023.
- A 9.55% ROE, a 54.51% equity ratio and a 7.11% WACC for purposes of calculating SPS’ allowance for funds used during construction and in other proceedings filed before the PUCT where a stated WACC is required.
- The reflection in rates of the retirement of Tolk Generation Station from 2034 to 2028.
- Establishment of a rate rider of approximately $18 million to be recovered over a three-year period for various deferred expenses.

In July 2024, SPS filed to surcharge the final under-recovered amount of $37 million. This will be largely offset by previously deferred costs. In February 2025, the PUCT approved the surcharge.

*2022 All-Source RFP —* In July 2023, SPS filed for approval of a CPCN for a recommended generation portfolio, which includes 418 MW of self-build solar projects and a 36 MW battery. The NMPRC approved the projects in May 2024. In July 2024, the PUCT approved the solar projects and denied the battery project. The PUCT’s approval included minimum production and PTC guarantees.

*New Mexico Resource Plan (IRP) —* In October 2023, SPS filed its IRP with the NMPRC, which supports projected load growth and increasing reliability requirements, and secures replacement energy and capacity for retiring resources. SPS’ projected resource needs ranging from approximately 5,300 MW to 10,200 MW by 2030. In February 2024, the NMPRC accepted the IRP.

In July 2024, SPS issued a RFP, seeking approximately 3,200 MW of accredited generation capacity by 2030. The total capacity to be added to the system is expected to align with the range identified in the SPS IRP, depending on the types of resources proposed in the RFP and their accredited capacity factors.

The RFP portfolio selection is expected in May 2025. SPS is expected to file for a CON for the recommended portfolio in the summer of 2025. The PUCT and NMPRC are expected to rule on the portfolio in 2026.

*Texas System Resiliency Plan —* In December 2024, SPS filed its Texas SRP with the PUCT. Consistent with PUCT requirements, SPS’ proposed plan discusses resiliency-related risks and the five measures that have been designed to help SPS prevent, withstand, mitigate or more promptly recover from resiliency events, including wildfire.

The SRP includes the following measures:

- Distribution overhead hardening — Replacing and reinforcing key components of the distribution overhead system.
- Distribution system protection modernization — Installing enhanced reclosers, communications equipment and replacing substation relay panels and breakers.
- Communication modernization — Building out a private LTE network, installing fiber optic cable and adding remote terminal units.
- Operational flexibility — Procuring mobile substation equipment and installing additional switching devices.
- Wildfire mitigation — Weather stations, modeling, deploying artificial intelligence and vegetation management.

The plan covers 2025-2028 and includes the following total spend:

| (Millions of Dollars) | Capital | O&M | Total |
| --- | ---: | ---: | ---: |
| Distribution overhead hardening | $253 | $— | $253 |
| Distribution system protection modernization | 92 | — | 92 |
| Communication modernization | 112 | — | 112 |
| Operational flexibility | 44 | — | 44 |
| Wildfire mitigation | 20 | 17 | 37 |
| Total | $521 | $17 | $538 |

The procedural schedule is as follows:

- Intervenor testimony: February 28, 2025
- Staff testimony: March 7, 2025
- Rebuttal testimony: March 17, 2025
- Hearing: March 25-26, 2025

A PUCT decision is expected in the summer of 2025.

### Purchased Power Arrangements and Transmission Service Providers

SPS expects to use electric generating stations, power purchases, DSM and new generation options to meet its system capacity requirements.

*Purchased Power —* SPS purchases power from other utilities and IPPs. Long-term purchased power contracts typically require periodic capacity and energy charges. SPS also makes short-term purchases to meet system load and energy requirements to replace owned generation, meet operating reserve obligations or obtain energy at a lower cost.

*Purchased Transmission Services —* SPS has contractual arrangements with SPP and regional transmission service providers to deliver power and energy to its native load customers.

### Natural Gas

SPS does not provide retail natural gas service, but purchases and transports natural gas for its generation facilities and operates limited natural gas pipeline facilities connecting the generation facilities to interstate natural gas pipelines, subject in certain cases to the regulation of the Railroad Commission of Texas. SPS is subject to the jurisdiction of the FERC with respect to natural gas transactions in interstate commerce and the PHMSA, DOT and PUCT for pipeline safety compliance.

### Wholesale and Commodity Marketing Operations

SPS conducts various wholesale marketing operations, including the purchase and sale of electric capacity, energy, ancillary services and energy related products. SPS uses physical and financial instruments to minimize commodity price risk and to hedge sales and purchases. Sharing of any margin is determined through state regulatory proceedings as well as the operation of the FERC approved joint operating agreement.

### Other

### Supply Chain

Xcel Energy’s ability to meet customer energy requirements, growing customer demand, respond to storm-related disruptions, and execute our capital expenditure program are dependent on maintaining an efficient supply chain.

Large global demand for energy-related infrastructure has stretched equipment supply chains, extended delivery dates and increased prices for items like combustion turbines, transformers and other large electrical equipment. The labor market for skilled engineering and construction resources to build renewables and gas generation has also been strained, impacting cost and availability.

In addition, manufacturing processes have experienced disruptions related to the scarcity of certain raw materials and interruptions in production and shipping. The impact of inflationary pressures, geopolitical events and federal policies have exacerbated the situation. Xcel Energy continues to monitor the situation as it remains fluid and seeks to mitigate the impacts by securing alternative suppliers and key vendor partners, increasing procurement lead times, modifying design standards, and adjusting the timing of work.

#### Tariffs and Trade Complaints

In May 2024, the U.S. Department of Commerce announced the initiation of anti-dumping and countervailing duty investigations of CSPV cells from Cambodia, Malaysia, Thailand and Vietnam, whether or not assembled into modules.

In October 2024, the U.S. Department of Commerce announced its preliminary determination in the countervailing duty circumvention investigation, which is not expected to impact Xcel Energy projects. In November 2024, the U.S. Department of Commerce concluded that dumping had occurred and the impact to Xcel Energy is still being evaluated.

In May 2024, the White House imposed a new 25% tariff on Lithium-Ion storage along with other trade measures. The tariff went into immediate effect for EV batteries but has a grace period until January 2026 for stationary energy storage applications.

In January of 2025, the U.S. International Trade Commission made an affirmative determination in the preliminary phase of the anti-dumping and countervailing duty investigations concerning Active Anode Material, a component of lithium-ion batteries, from China. This case will be reviewed by the U.S. Department of Commerce and the International Trade Commission over the course of 2025.

In early 2025, several executive orders were issued, some of which impose new tariffs on certain imports, which may impact our procurement activities.

Xcel Energy continues to assess the impacts of these tariffs, trade complaints and federal policies on its business, including company owned projects and PPAs. Xcel Energy may seek regulatory relief for tariffs, if required, in its jurisdictions.

Further policy actions or other restrictions on solar and storage imports, disruptions in imports from key suppliers, or any new trade complaint could impact project timelines and costs of various generation projects and PPAs.

### Excess Liability Insurance Coverage

Xcel Energy maintains excess liability coverage, which is intended to insure against liability to third parties. Through the third quarter of 2024, Xcel Energy had approximately $600 million of excess liability coverage; including $520 million of wildfire coverage with an annual premium of approximately $40 million. Examples of claims paid under this policy include property damage or bodily injury to members of the public caused by Xcel Energy’s employees, equipment or facilities. The increased wildfire liability risk and claims are driving a significant increase of premiums and reductions in insurance coverage in the excess liability markets, especially in the western United States. In October 2024, Xcel Energy renewed its excess liability coverage and now has $450 million of total coverage; including $450 million of wildfire coverage for the NSP System and $300 million of wildfire coverage for PSCo and SPS. The annual premium for this excess liability insurance is approximately $130 million. Xcel Energy received an approved deferral at PSCo, filed a deferral request at NSP-Wisconsin and will continue to seek to recover these increased costs through various regulatory proceedings, including planned deferral requests or rate filings in several states.

### Critical Accounting Policies and Estimates

Preparation of the consolidated financial statements requires the application of accounting rules and guidance, as well as the use of estimates. Application of these policies involves judgments regarding future events, including the likelihood of success of particular projects, legal and regulatory challenges and anticipated recovery of costs. These judgments could materially impact the consolidated financial statements, based on varying assumptions. In addition, the financial and operating environment also may have a significant effect on the operation of the business and results reported.

Accounting policies and estimates that are most significant to Xcel Energy’s results of operations, financial condition or cash flows, and require management’s most difficult, subjective or complex judgments are outlined below. Each of these has a higher likelihood of resulting in materially different reported amounts under different conditions or using different assumptions. Each critical accounting policy has been reviewed and discussed with the Audit Committee of Xcel Energy Inc.’s Board of Directors on a quarterly basis.

### Regulatory Accounting

Xcel Energy is subject to the accounting for Regulated Operations, which provides that rate-regulated entities report assets and liabilities consistent with the recovery of those incurred costs in rates, if it is probable that such rates will be charged and collected. Our rates are derived through the ratemaking process, which results in the recording of regulatory assets and liabilities based on the probability of future cash flows.

Regulatory assets generally represent incurred or accrued costs that have been deferred because future recovery from customers is probable. Regulatory liabilities generally represent amounts that are expected to be refunded to customers in future rates or amounts collected in current rates for future costs. In other businesses or industries, regulatory assets and regulatory liabilities would generally be charged to net income or other comprehensive income.

Each reporting period we assess the probability of future recoveries and obligations associated with regulatory assets and liabilities. Factors such as the current regulatory environment, recently issued rate orders and historical precedents are considered. Decisions made by regulatory agencies can directly impact the amount and timing of cost recovery as well as the rate of return on invested capital, and may materially impact our results of operations, financial condition or cash flows.

As of Dec. 31, 2024 and 2023, Xcel Energy had regulatory assets of $3.4 billion and $3.4 billion, respectively and regulatory liabilities of $6.9 billion and $6.4 billion, respectively. Each subsidiary is subject to regulation that varies from jurisdiction to jurisdiction. If future recovery of costs in any such jurisdiction is no longer probable, Xcel Energy would be required to charge these assets to current net income or other comprehensive income.

At Dec. 31, 2024, in assessing the probability of recovery of recognized regulatory assets, unless otherwise disclosed, Xcel Energy noted no current or anticipated proposals or changes in the regulatory environment that it expects will materially impact the recovery of the assets.

See Notes 4 and 12 to the consolidated financial statements for further information.

### Income Tax Accruals

Judgment, uncertainty and estimates are a significant aspect of the income tax accrual process that accounts for the effects of current and deferred income taxes. Uncertainty associated with the application of tax statutes and regulations and outcomes of tax audits and appeals require that judgment and estimates be made in the accrual process and in the calculation of the ETR.

Changes in tax laws and rates may affect recorded deferred tax assets and liabilities and our future ETR. ETR calculations are revised every quarter based on best available year-end tax assumptions, adjusted in the following year after returns are filed. Tax accrual estimates are trued-up to the actual amounts claimed on the tax returns and further adjusted after examinations by taxing authorities, as needed.

In accordance with the interim period reporting guidance, income tax expense for the first three quarters in a year is based on the forecasted annual ETR. The forecasted ETR reflects a number of estimates, including forecasted annual income, permanent tax adjustments and tax credits.

Valuation allowances are applied to deferred tax assets if it is more likely than not that at least a portion may not be realized. Accounting for income taxes also requires that only tax benefits that meet the more likely than not recognition threshold can be recognized or continue to be recognized.

We may adjust our unrecognized tax benefits and interest accruals as disputes with the IRS and state tax authorities are resolved, and as new developments occur. These adjustments may increase or decrease earnings.

See Note 7 to the consolidated financial statements for further information.

### Employee Benefits

We sponsor several noncontributory, defined benefit pension plans and other postretirement benefit plans that cover almost all employees and certain retirees. Projected benefit costs are based on historical information and actuarial calculations that include key assumptions (annual return level on pension and postretirement health care investment assets, discount rates, mortality rates and health care cost trend rates, etc.). In addition, the pension cost calculation uses a methodology to reduce the volatility of investment performance over time. Pension assumptions are continually reviewed.

At Dec. 31, 2024, Xcel Energy set the rate of return on assets used to measure pension costs at 7.13%, which is a 20 basis point increase from the rate set at Dec. 31, 2023. The rate of return used to measure postretirement health care costs is 6.25% at Dec. 31, 2024, which is a 125 basis point increase from the rate set in 2023. Xcel Energy’s pension investment strategy includes plan-specific investments that seek to align the investment allocations to optimize risk adjusted return and interest rate risk management based on factors that include the plan’s funded status. This strategy generally results in a greater percentage of interest rate sensitive securities being allocated to plans with higher funded status ratios and a greater percentage of growth assets being allocated to plans having lower funded status ratios.

Xcel Energy set the discount rates used to value both the pension obligations and postretirement health care obligations at 5.88% at Dec. 31, 2024. This represents a 39 basis point and 34 basis point increase, respectively, from 2023. Xcel Energy uses a bond matching study as its primary basis for determining the discount rate used to value pension and postretirement health care obligations. The bond matching study utilizes a portfolio of high grade (Aa or higher) bonds that matches the expected cash flows of Xcel Energy’s benefit plans in amount and duration.

The effective yield on this cash flow matched bond portfolio determines the discount rate for the individual plans. The bond matching study is validated for reasonableness against the Bank of America US Corporate 15+ Bond Index. In addition, Xcel Energy reviews general actuarial survey data to assess the reasonableness of the discount rate selected.

If Xcel Energy were to use alternative assumptions, a 1% change would result in the following impact on 2025 pension costs, net of the effects of regulation:

|  | Pension Costs |  |
| --- | ---: | ---: |
| **(Millions of Dollars)** | **+1%** | **-1%** |
| Rate of return | $(12) | $24 |
| Discount rate | (2) | 2 |

Mortality rates are developed from actual and projected plan experience for pension plan and postretirement benefits. Xcel Energy’s actuary conducts an experience study periodically to determine an estimate of mortality. Xcel Energy considers standard mortality tables, improvement factors and the plans actual experience when selecting a best estimate.

As of Dec. 31, 2024, the initial medical trend cost claim assumptions for Pre-65 was 7.0% and Post-65 was 7.5%. The ultimate trend assumption remained at 4.5% for both Pre-65 and Post-65 claims costs. Xcel Energy bases its medical trend assumption on the long-term cost inflation expected in the health care market, considering the levels projected and recommended by industry experts, as well as recent actual medical cost experienced by Xcel Energy’s retiree medical plan.

Funding contributions in 2024 were $100 million and will be $125 million in 2025. In future years contributions will decrease slightly but then remain relatively consistent. Investment returns were less than the assumed levels in 2024 and 2022, but were more than the assumed levels in 2023.

The pension cost calculation uses a market-related valuation of pension assets. Xcel Energy uses a calculated value method to determine the market-related value of the plan assets. The market-related value is determined by adjusting the fair market value of assets at the beginning of the year to reflect the investment gains and losses (the difference between the actual investment return and the expected investment return on the market-related value) during each of the previous five years at the rate of 20% per year.

As differences between actual and expected investment returns are incorporated into the market-related value, amounts are recognized in pension cost over the expected average remaining years of service for active employees (approximately 14 years in 2024).

Xcel Energy currently projects the pension costs recognized for financial reporting purposes will be $60 million in 2025 and $69 million in 2026, while the actual pension costs were $79 million in 2024 and $74 in 2023. The expected decrease in 2025 is primarily due to the absence of a pension settlement.

Pension funding contributions across all four of Xcel Energy’s pension plans, both voluntary and required, for 2022 - 2025:

- $125 million in January 2025.
- $100 million in 2024.
- $50 million in 2023.
- $50 million in 2022.

Future amounts may change based on actual market performance, changes in interest rates and any changes in governmental regulations. Therefore, additional contributions could be required in the future. Xcel Energy contributed $11 million, $11 million and $13 million during 2024, 2023 and 2022, respectively, to the postretirement health care plans. Xcel Energy expects to contribute approximately $8 million during 2025.

Xcel Energy recovers employee benefits costs in its utility operations consistent with accounting guidance with the exception of the areas noted below.

- NSP-Minnesota recognizes pension expense in all regulatory jurisdictions using the aggregate normal cost actuarial method. Differences between aggregate normal cost and expense as calculated by pension accounting standards are deferred as a regulatory liability.
- PSCo and SPS recognize pension expense in all regulatory jurisdictions based on GAAP. The Texas and Colorado electric retail jurisdictions and the Colorado gas retail jurisdiction, each record the difference between annual recognized pension expense and the annual amount of pension expense approved in their last respective general rate case as a deferral to a regulatory asset.
- Regulatory Commissions in Texas, New Mexico and FERC jurisdictions allow the recovery of other postretirement benefit costs only to the extent that recognized expense is matched by cash contributions to an irrevocable trust. Xcel Energy has consistently funded at a level to allow full recovery of costs in these jurisdictions.
- PSCo is required to create a regulatory liability to the extent expense is less than that included in rates. No adjustment was needed in 2024.

See Note 11 to the consolidated financial statements for further information.

### Nuclear Decommissioning

Xcel Energy recognizes liabilities for the expected cost of retiring tangible long-lived assets for which a legal obligation exists. These AROs are recognized at fair value as incurred and are capitalized as part of the cost of the related long-lived assets. In the absence of quoted market prices, Xcel Energy estimates the fair value of its AROs using present value techniques, in which it makes assumptions including estimates of the amounts and timing of future cash flows associated with retirement activities, credit-adjusted risk free rates and cost escalation rates. When Xcel Energy revises any assumptions, it adjusts the carrying amount of both the ARO liability and related long-lived asset. ARO liabilities are accreted to reflect the passage of time using the interest method.

A significant portion of Xcel Energy’s AROs relates to the future decommissioning of NSP-Minnesota’s nuclear facilities. The nuclear decommissioning obligation is funded by the external decommissioning trust fund. Difference between regulatory funding (including depreciation expense less returns from the external trust fund) and expense recognized is deferred as a regulatory liability. The amounts recorded for AROs related to future nuclear decommissioning were $2.5 billion in 2024 and $2.1 billion in 2023.

NSP-Minnesota obtains periodic independent cost studies to estimate the cost and timing of planned nuclear decommissioning activities. Estimates of future cash flows are highly uncertain and may vary significantly from actual results. NSP-Minnesota is required to file a nuclear decommissioning filing every three years. The filing covers all expenses for the decommissioning of the nuclear plants, including decontamination and removal of radioactive material. In November 2024, the 2025-2027 Triennial Nuclear Plant Decommissioning Study was filed.

The following assumptions have a significant effect on the estimated nuclear obligation:

*Timing —* Decommissioning cost estimates are impacted by each facility’s retirement date and timing of the actual decommissioning activities. Estimated retirement dates coincide with the retirement dates approved by the MPUC, which can be different than the expiration dates of each unit’s operating license with the NRC (i.e., 2050 for Monticello and 2033 and 2034 for Prairie Island Units 1 and 2, respectively).

In December 2024, the operating license for Xcel Energy’s Monticello Nuclear Generating Plant in Monticello, MN was renewed. The approval allows the plant to operate an additional 20 years, through 2050. As of Dec. 31, 2024, the planned retirement dates of the Prairie Island Unit 1 and Unit 2 and Monticello were 2033, 2034 and 2040. In February 2025, the MPUC approved the planned life extension through 2050 as part of the Upper Midwest Resource Plan. These will be incorporated in decommissioning estimates in 2025 once additional approvals have been received.

The estimated timing of the decommissioning activities is based upon the 60 year DECON method, which assumes prompt removal and dismantlement. Decommissioning activities are expected to begin at the commission approved retirement date and be completed for both facilities by approximately 2101.

*Technology and Regulation —* There is limited experience with actual decommissioning of large nuclear facilities. Changes in technology, experience and regulations could cause cost estimates to change significantly.

*Escalation Rates —* Escalation rates represent projected cost increases due to general inflation and increases in the cost of decommissioning activities. NSP-Minnesota used an escalation rate of 3.8% in calculating the ARO for nuclear decommissioning of its nuclear facilities, based on weighted averages of labor and non-labor escalation factors.

*Discount Rates —* Changes in timing or estimated cash flows that result in upward revisions to the ARO are calculated using the then-current credit-adjusted risk-free interest rate. The credit-adjusted risk-free rate in effect when the change occurs is used to discount the revised estimate of the incremental expected cash flows of the retirement activity.

If the change in timing or estimated expected cash flows results in a downward revision of the ARO, the undiscounted revised estimate of expected cash flows is discounted using the credit-adjusted risk-free rate in effect at the date of initial measurement and recognition of the original ARO. Discount rates ranging from approximately 3% to 7% have been used to calculate the net present value of the expected future cash flows over time.

Significant uncertainties exist in estimating future costs including the method to be utilized, ultimate costs to decommission and planned method of disposing spent fuel. If different cost estimates, life assumptions or cost escalation rates were utilized, the AROs could change materially.

However, changes in estimates have minimal impact on results of operations as NSP-Minnesota expects to continue to recover all costs in future rates.

NSP-Minnesota continually makes judgments and estimates related to these critical accounting policy areas, based on an evaluation of the assumptions and uncertainties for each area. The information and assumptions of these judgments and estimates will be affected by events beyond the control of Xcel Energy, or otherwise change over time.

This may require adjustments to recorded results to better reflect updated information that becomes available. The accompanying financial statements reflect management’s best estimates and judgments of the impact of these factors as of Dec. 31, 2024.

See Note 12 to the consolidated financial statements for further information.

### Loss Contingencies – Wildfires

The outcomes of legal proceedings and claims brought against Xcel Energy related to the Marshall Fire, Smokehouse Creek Fire Complex or any future wildfire are subject to uncertainty. An estimated loss from a loss contingency such as a legal proceeding or claim is accrued if it is probable of being incurred and the amount of the loss can be reasonably estimated. Each reporting period we evaluate, among other factors, the degree of probability of unfavorable outcomes and the ability to make reasonable estimates of potential losses. The process for evaluating any wildfire-related liabilities requires a series of complex judgments about past and future events. Factors such as the cause of a wildfire, the extent and magnitude of potential damages and the status of investigations and legal proceedings are considered. See Note 12 accompanying the consolidated financial statements for additional information.

### Derivatives, Risk Management and Market Risk

We are exposed to a variety of market risks in the normal course of business. Market risk is the potential loss that may occur as a result of adverse changes in the market or fair value for a particular instrument or commodity. All financial and commodity-related instruments, including derivatives, are subject to market risk.

Xcel Energy is exposed to the impact of adverse changes in price for energy and energy-related products, which is partially mitigated by the use of commodity derivatives. In addition to ongoing monitoring and maintaining credit policies intended to minimize overall credit risk, management takes steps to mitigate changes in credit and concentration risks associated with its derivatives and other contracts, including parental guarantees and requests of collateral. While we expect that the counterparties will perform on the contracts underlying our derivatives, the contracts expose us to credit and non-performance risk.

Distress in the financial markets may impact counterparty risk and the fair value of the securities in the nuclear decommissioning fund and pension fund.

***Commodity Price Risk —*** We are exposed to commodity price risk in our electric and natural gas operations. Commodity price risk is managed by entering into long and short-term physical purchase and sales contracts for electric capacity, energy and energy-related products and fuels used in generation and distribution activities.

Commodity price risk is also managed through the use of financial derivative instruments. Our risk management policy allows us to manage commodity price risk within each rate-regulated operation per commission approved hedge plans.

***Wholesale and Commodity Trading Risk —*** Xcel Energy conducts various wholesale and commodity trading activities, including the purchase and sale of electric capacity, energy, energy-related instruments and natural gas-related instruments, including derivatives. Our risk management policy allows management to conduct these activities within guidelines and limitations as approved by our risk management committee.

Fair value of net commodity trading contracts as of Dec. 31, 2024:

| (Millions of Dollars) | Futures / Forwards Maturity Less Than 1 Year | 1 to 3 Years | 4 to 5 Years | Greater Than 5 Years | Total Fair Value |
| --- | ---: | ---: | ---: | ---: | ---: |
| NSP-Minnesota (a) | $(16) | $(19) | $(4) | $— | $(39) |
| NSP-Minnesota (b) | 3 | 10 | (4) | 2 | 11 |
| PSCo (a) | 1 | 5 | — | — | 6 |
|  | $(12) | $(4) | $(8) | $2 | $(22) |

| (Millions of Dollars) | Options Maturity Less Than 1 Year | 1 to 3 Years | 4 to 5 Years | Greater Than 5 Years | Total Fair Value |
| --- | ---: | ---: | ---: | ---: | ---: |
| NSP-Minnesota (b) | $— | $— | $20 | $— | $20 |

(a) Prices actively quoted or based on actively quoted prices.

(b) Prices based on models and other valuation methods.

Changes in the fair value of commodity trading contracts before the impacts of margin-sharing for the years ended Dec. 31:

| (Millions of Dollars) | 2024 | 2023 |
| --- | ---: | ---: |
| Fair value of commodity trading net contracts outstanding at Jan. 1 | $1 | $(10) |
| Contracts realized or settled during the period | — | (2) |
| Commodity trading contract additions and changes during the period | (3) | 13 |
| Fair value of commodity trading net contracts outstanding at Dec. 31 | $(2) | $1 |

A 10% increase and 10% decrease in forward market prices for Xcel Energy’s commodity trading contracts would have likewise increased and decreased pretax income from continuing operations, by approximately $2 million at Dec. 31, 2024 and $4 million at Dec. 31, 2023.

The utility subsidiaries’ commodity trading operations measure the outstanding risk exposure to price changes on contracts and obligations using an industry standard methodology known as VaR. VaR expresses the potential change in fair value of the outstanding contracts and obligations over a particular period of time under normal market conditions.

The VaRs for the NSP-Minnesota and PSCo commodity trading operations, excluding both non-derivative transactions and derivative transactions designated as normal purchases and normal sales, calculated on a consolidated basis using a Monte Carlo simulation with a 95% confidence level and a one-day holding period, were as follows:

| (Millions of Dollars) | Year Ended Dec. 31 | Average | High | Low |
| --- | ---: | ---: | ---: | ---: |
| 2024 | $— | $— | $1 | $— |
| 2023 | — | — | 1 | — |

***Nuclear Fuel Supply —*** NSP-Minnesota has contracted for its 2025 through 2029 enriched nuclear material requirements, which are in various stages of processing in Canada, Europe and the United States. In May 2024, the Prohibiting Russian Uranium Imports Act was signed into law. As such, NSP-Minnesota is no longer permitted to accept deliveries of enriched nuclear material from Russia beginning in August 2024, unless specific waivers are requested and received.

***Interest Rate Risk —*** Xcel Energy is subject to interest rate risk. Our risk management policy allows interest rate risk to be managed through the use of fixed rate debt, floating rate debt and interest rate derivatives.

A 100 basis point change in the benchmark rate on Xcel Energy’s variable rate debt would impact pretax interest expense annually by approximately $7 million and $9 million in 2024 and 2023, respectively.

NSP-Minnesota maintains a nuclear decommissioning fund, as required by the NRC. The nuclear decommissioning fund is subject to interest rate and equity price risk. The fund is invested in a diversified portfolio of debt securities, equity securities and other investments. These investments may be used only for the purpose of decommissioning NSP-Minnesota’s nuclear generating plants.

Fluctuations in equity prices or interest rates affecting the nuclear decommissioning fund do not have a direct impact on earnings due to the application of regulatory accounting. Realized and unrealized gains on the decommissioning fund investments are deferred as an offset of NSP-Minnesota’s regulatory asset for nuclear decommissioning costs.

The value of pension and postretirement plan assets and benefit costs are impacted by changes in discount rates and expected return on plan assets. Xcel Energy’s ongoing pension and postretirement investment strategy is based on plan-specific investment recommendations that seek to optimize potential investment risk and minimize interest rate risk associated with changes in the obligations as a plan’s funded status increases over time. The impacts of fluctuations in interest rates on pension and postretirement costs are mitigated by pension cost calculation methodologies and regulatory mechanisms that minimize the earnings impacts of such changes.

***Credit Risk —*** Xcel Energy is also exposed to credit risk. Credit risk relates to the risk of loss resulting from counterparties’ nonperformance on their contractual obligations. Xcel Energy maintains credit policies intended to minimize overall credit risk and actively monitors these policies to reflect changes and scope of operations.

At Dec. 31, 2024, a 10% increase in commodity prices would have resulted in an increase in credit exposure of $26 million, while a decrease in prices of 10% would have resulted in a decrease in credit exposure of $25 million. At Dec. 31, 2023, a 10% increase in commodity prices would have resulted in an increase in credit exposure of $27 million, while a decrease in prices of 10% would have resulted in an decrease in credit exposure of $24 million.

Xcel Energy conducts credit reviews for all wholesale, trading and non-trading commodity counterparties and employs credit risk controls, such as letters of credit, parental guarantees, master netting agreements and termination provisions.

Credit exposure is monitored, and when necessary, the activity with a specific counterparty is limited until credit enhancement is provided. Distress in the financial markets could increase our credit risk.

### Fair Value Measurements

Derivative contracts, with the exception of those designated as normal purchases and normal sales, are reported at fair value. Xcel Energy’s investments held in the nuclear decommissioning fund, rabbi trusts, pension and other postretirement funds are also subject to fair value accounting. See Notes 10 and 11 to the consolidated financial statements for further information.

### Liquidity and Capital Resources

### Cash Flows

### Operating Cash Flows

| (Millions of Dollars) | Twelve Months Ended Dec. 31 |
| --- | ---: |
| Cash provided by operating activities — 2023 | $5,327 |
| Components of change — 2024 vs. 2023 |  |
| Higher net income | 165 |
| Non-cash transactions | 222 |
| Changes in deferred taxes | 284 |
| Changes in working capital | (783) |
| Changes in net regulatory and other assets and liabilities | (574) |
| Cash provided by operating activities — 2024 | $4,641 |

Net cash provided by operating activities decreased by $686 million for 2024 as compared to 2023. The decrease was largely due to interim rate refunds in Minnesota and timing of recovery of deferred fuel costs, partially offset by the change in deferred income taxes, which includes the impact of proceeds for tax credit transfers.

### Investing Cash Flows

| (Millions of Dollars) | Twelve Months Ended Dec. 31 |
| --- | ---: |
| Cash used in investing activities — 2023 | $(5,926) |
| Components of change — 2024 vs. 2023 |  |
| Increased capital expenditures | (1,510) |
| Other investing activities | 8 |
| Cash used in investing activities — 2024 | $(7,428) |

Net cash used in investing activities increased by $1,502 million for 2024 as compared to 2023. The increase in capital expenditures was largely due to continued system expansion and increased investment in renewable and transmission projects.

### Financing Cash Flows

| (Millions of Dollars) | Twelve Months Ended Dec. 31 |
| --- | ---: |
| Cash provided by financing activities —2023 | $617 |
| Components of change — 2024 vs. 2023 |  |
| Higher long-term debt issuances, net of repayments | 1,512 |
| Higher proceeds from issuance of common stock | 847 |
| Higher dividends paid to shareholders | (83) |
| Other financing activities | (56) |
| Cash provided by financing activities — 2024 | $2,837 |

Net cash provided by financing activities increased by $2,220 million for 2024 as compared to 2023. The increase was largely related to additional debt and common stock issuances to fund capital investment.

See Note 5 to the consolidated financial statements for further information.

### Capital Requirements

Xcel Energy has contractual obligations and other commitments that will need to be funded in the future. Xcel Energy expects to have adequate amounts of cash from operating and financing activities to meet both its short-term and long-term cash requirements. Xcel Energy’s financing requirements are dependent on both existing contractual obligations and other commitments, as well as projected capital forecasts. Xcel Energy expects to meet future financing requirements by periodically issuing short-term debt, long-term debt, common stock, hybrid and other securities to maintain desired capitalization ratios. Projected future financing requirements can be impacted by various factors including constraints to supply chain and labor, regulatory lag and inflation.

### Material Cash Requirements and Other Commitments

| (Millions of Dollars) | Payments Due by Period (as of Dec. 31, 2024) Total | Less than 1 Year | 1 to 3 Years | 3 to 5 Years | After 5 Years |
| --- | ---: | ---: | ---: | ---: | ---: |
| Long-term debt, principal and interest payments | $50,915 | $2,292 | $3,316 | $3,846 | $41,461 |
| Finance lease obligations | 208 | 10 | 17 | 16 | 165 |
| Operating leases obligations (a) | 1,355 | 271 | 432 | 215 | 437 |
| Unconditional purchase obligations (b) (c) | 3,755 | 1,432 | 1,207 | 432 | 684 |
| Other long-term obligations, including current portion (d) | 85 | 20 | 36 | 29 | — |
| Other short-term obligations | 632 | 632 | — | — | — |
| Short-term debt | 695 | 695 | — | — | — |
| Total contractual cash obligations | $57,645 | $5,352 | $5,008 | $4,538 | $42,747 |

(a) Included in operating lease obligations are $240 million, $372 million, $166 million and $199 million, for the less than 1 year, 1 - 3 years, 3 - 5 years and after 5 years categories, respectively, pertaining to PPAs that are accounted for as operating leases.

(b) Xcel Energy Inc. and its subsidiaries have contracts providing for the purchase and delivery of a significant portion of its fuel (nuclear, natural gas and coal) requirements. Additionally, the utility subsidiaries of Xcel Energy Inc. have entered into non-lease purchase power agreements. Certain contractual purchase obligations are adjusted on indices. Effects of price changes are mitigated through cost of energy adjustment mechanisms.

(c) Amounts exclude approximately $1 billion of incremental payments related to SPS’ renegotiation and extension of a non-lease PPA that received PUCT approval in February 2025. The extension to 2040 will result in annual payments of approximately $65 million to $80 million commencing in 2025.

(d) Primarily consists of contracts for information technology services.

***Capital Expenditures —*** Base capital expenditures for Xcel Energy for 2025 through 2029:

| By Regulated Utility | Actual 2024 | Base Capital Forecast (Millions of Dollars) 2025 | 2026 | 2027 | 2028 | 2029 | 2025 - 2029 Total |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| PSCo | $3,180 | $5,820 | $5,190 | $3,940 | $3,780 | $3,550 | $22,280 |
| NSP-Minnesota | 2,830 | 3,240 | 2,500 | 2,830 | 2,080 | 2,570 | 13,220 |
| SPS | 1,100 | 1,400 | 1,540 | 1,280 | 1,040 | 1,040 | 6,300 |
| NSP-Wisconsin | 560 | 640 | 650 | 690 | 660 | 670 | 3,310 |
| Other (a) | (20) | (100) | (40) | 10 | 10 | 10 | (110) |
| Total base capital expenditures | $7,650 | $11,000 | $9,840 | $8,750 | $7,570 | $7,840 | $45,000 |

(a) Other category includes intercompany transfers for safe harbor wind turbines.

| By Function | Actual 2024 | Base Capital Forecast (Millions of Dollars) 2025 | 2026 | 2027 | 2028 | 2029 | 2025 - 2029 Total |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Electric distribution | $2,220 | $2,570 | $3,000 | $3,400 | $3,320 | $3,540 | $15,830 |
| Electric transmission | 1,720 | 2,260 | 2,860 | 2,740 | 2,390 | 2,310 | 12,560 |
| Renewables | 1,130 | 3,360 | 1,400 | 260 | — | — | 5,020 |
| Electric generation | 960 | 1,210 | 1,150 | 910 | 580 | 620 | 4,470 |
| Natural gas | 780 | 800 | 680 | 690 | 630 | 620 | 3,420 |
| Other | 840 | 800 | 750 | 750 | 650 | 750 | 3,700 |
| Total base capital expenditures | $7,650 | $11,000 | $9,840 | $8,750 | $7,570 | $7,840 | $45,000 |

The base plan does not include any potential incremental generation or transmission assets that are pending commission approval through an RFP, a resource plan, or from additional data center load, which could result in additional capital expenditures of $10 billion or greater. Xcel Energy generally expects to fund additional capital investment with approximately 40% equity and 60% debt.

Xcel Energy’s capital expenditure forecast is subject to continuing review and modification. Actual capital expenditures may vary from estimates due to changes in electric and natural gas projected load growth, safety and reliability needs, regulatory decisions, legislative initiatives, tax policy, reserve requirements, availability of purchased power, alternative plans for meeting long-term energy needs, environmental initiatives and regulation, and merger, acquisition and divestiture opportunities.

***Financing for Capital Expenditures through 2029 —*** Xcel Energy issues debt and equity securities to refinance retiring debt maturities, reduce short-term debt, fund capital programs, infuse equity in subsidiaries, fund asset acquisitions and for general corporate purposes.

Current estimated financing plans of Xcel Energy for 2025 through 2029 (includes the impact of tax credit transferability):

| (Millions of Dollars) Funding Capital Expenditures |  |
| --- | ---: |
| Cash from operations (a) | $25,320 |
| New debt (b) | 15,180 |
| Equity through the DRIP and benefit program | 500 |
| Other equity | 4,000 |
| Base capital expenditures 2025 - 2029 | $45,000 |
| **Maturing debt** | $3,730 |

(a) Net of dividends and pension funding.

(b) Reflects a combination of short and long-term debt; net of refinancing.

### Off-Balance Sheet Arrangements

Xcel Energy does not have any off-balance-sheet arrangements, other than those currently disclosed, that have or are reasonably likely to have a current or future effect on financial condition, changes in financial condition, revenues or expenses, results of operations, liquidity, capital expenditures or capital resources that is material to investors.

***Common Stock Dividends —*** Future dividend levels will be dependent on Xcel Energy’s results of operations, financial condition, cash flows, reinvestment opportunities and other factors, and will be evaluated by the Xcel Energy Inc. Board of Directors. In February 2025, Xcel Energy announced an increase in the annual dividend of 9 cents per share, which represents an increase of 4.1%.

Xcel Energy’s dividend policy balances the following:

- Projected cash generation.
- Projected capital investment.
- A reasonable rate of return on shareholder investment.
- The impact on Xcel Energy’s capital structure and credit ratings.

In addition, there are certain statutory limitations that could affect dividend levels. Federal law places limits on the ability of public utilities within a holding company to declare dividends. Under the Federal Power Act, a public utility may not pay dividends from any funds properly included in a capital account. The utility subsidiaries’ dividends may be limited directly or indirectly by state regulatory commissions or bond indenture covenants.

See Note 5 to the consolidated financial statements for further information.

***Pension Fund —*** Xcel Energy’s pension assets are invested in a diversified portfolio of domestic and international equity securities, short-term to long-duration fixed income securities and alternative investments, including private equity, real estate and hedge funds.

Funded status and pension assumptions:

| (Millions of Dollars) | Dec. 31, 2024 | Dec. 31, 2023 |
| --- | ---: | ---: |
| Fair value of pension assets | $2,504 | $2,690 |
| Projected pension obligation (a) | 2,752 | 2,943 |
| Funded status | $(248) | $(253) |

(a) Excludes non-qualified plan of $13 million and $12 million at Dec. 31, 2024 and 2023, respectively.

| Pension Assumptions | 2024 | 2023 |
| --- | ---: | ---: |
| Discount rate | 5.88% | 5.49% |
| Expected long-term rate of return | 7.13 | 6.93 |

### Capital Sources

Short-Term Funding Sources — Xcel Energy generally funds short-term needs, through operating cash flows, notes payable, commercial paper and bank lines of credit. The amount and timing of short-term funding needs depend on construction expenditures, working capital and dividend payments.

Short-Term Investments — Xcel Energy Inc., NSP-Minnesota, NSP-Wisconsin, PSCo and SPS maintain cash and short-term investment accounts.

Short-Term Debt — Xcel Energy Inc., NSP-Minnesota, NSP-Wisconsin, PSCo and SPS each have individual commercial paper programs. Authorized levels for these commercial paper programs are:

- $1.50 billion for Xcel Energy Inc.
- $700 million for PSCo.
- $700 million for NSP-Minnesota.
- $500 million for SPS.
- $150 million for NSP-Wisconsin.

See Note 5 to the consolidated financial statements for further information.

Credit Facility Agreements — As of Feb. 24, 2025, Xcel Energy Inc. and its utility subsidiaries had the following committed credit facilities available to meet liquidity needs:

| (Millions of Dollars) | Facility (a) | Drawn (b) | Available | Cash | Liquidity |
| --- | ---: | ---: | ---: | ---: | ---: |
| Xcel Energy Inc. | $1,500 | $660 | $840 | $25 | $865 |
| PSCo | 700 | 101 | 599 | 10 | 609 |
| NSP-Minnesota | 700 | 375 | 325 | 7 | 332 |
| SPS | 500 | 255 | 245 | 7 | 252 |
| NSP-Wisconsin | 150 | 27 | 123 | 3 | 126 |
| Total | $3,550 | $1,418 | $2,132 | $52 | $2,184 |

(a) Credit facilities expire in September 2027.

(b) Includes outstanding commercial paper and letters of credit.

Xcel Energy Inc., NSP-Minnesota, PSCo and SPS each have the right to request an extension of the revolving credit facility for two additional one-year periods. NSP-Wisconsin has the right to request an extension of the revolving credit facility for an additional year. All extension requests are subject to majority bank group approval.

***Registration Statements —*** Xcel Energy Inc.’s Articles of Incorporation authorize the issuance of one billion shares of $2.50 par value common stock. As of Dec. 31, 2024 and 2023, Xcel Energy had approximately 574 million shares and 555 million shares of common stock outstanding, respectively.

Xcel Energy Inc. and its utility subsidiaries have registration statements on file with the SEC which are uncapped, permitting Xcel Energy Inc. and its utility subsidiaries to issue debt, equity and other securities. Debt issuance at our utility subsidiaries are subject to commission approval.

***Long-Term Borrowings, Equity Issuances and Other Financing Instruments —*** Xcel Energy may issue equity through its ATM program, forward equity agreements or other offerings. Financing plans are subject to change, depending on capital expenditures, regulatory outcomes, internal cash generation, market conditions, changes in tax policies and other factors.

***Planned Financing Activity —*** Xcel Energy’s 2025 financing plans reflect the following:

| Issuer | Security | Amount (Millions of Dollars) | Expected Tenor | Anticipated Timing |
| --- | --- | ---: | --- | --- |
| Xcel Energy Inc. | Senior Unsecured Notes | $1,000 | 10 Year | First Quarter |
| PSCo | First Mortgage Bonds | 2,000 | 10 Year & 30 Year | Second & Third Quarter |
| NSP-Minnesota | First Mortgage Bonds | 1,100 | 10 Year & 30 Year | First & Third Quarter |
| SPS | First Mortgage Bonds | 450 | 30 Year | Second Quarter |
| NSP-Wisconsin | First Mortgage Bonds | 250 | 30 Year | Second Quarter |

See Note 5 to the consolidated financial statements for further information.

### Earnings Guidance and Long-Term EPS and Dividend Growth Rate Objectives

***Xcel Energy 2025 Earnings Guidance —*** Xcel Energy’s 2025 ongoing earnings guidance is a range of $3.75 to $3.85 per share.(a)

Key assumptions as compared with 2024 actual levels unless noted:

- Constructive outcomes in all pending rate case and regulatory proceedings, including requests for deferral of incremental insurance costs associated with wildfire risk and recovery of O&M costs associated with wildfire mitigation plans.
- Normal weather patterns for the year.
- Weather-normalized retail electric sales are projected to increase ~3%.
- Weather-normalized retail firm natural gas sales are projected to increase ~1%.
- Capital rider revenue is projected to increase $260 million to $270 million (net of PTCs).
- O&M expenses are projected to increase ~3%.
- Depreciation expense is projected to increase approximately $210 million to $220 million.
- Property taxes are projected to increase $55 million to $65 million.
- Interest expense (net of AFUDC - debt) is projected to increase $165 million to $175 million, net of interest income.
- AFUDC - equity is projected to increase $110 million to $120 million.

(a) Ongoing earnings is calculated using net income and adjusting for certain nonrecurring or infrequent items that are, in management’s view, not reflective of ongoing operations. Ongoing earnings could differ from those prepared in accordance with GAAP for unplanned and/or unknown adjustments. As Xcel Energy is unable to quantify the financial impacts of any additional adjustments that may occur for the year, we are unable to provide a quantitative reconciliation of the guidance for ongoing EPS to corresponding GAAP EPS.

***Long-Term EPS and Dividend Growth Rate Objectives —*** Xcel Energy expects to deliver an attractive total return to our shareholders through a combination of earnings growth and dividend yield, based on the following long-term objectives:

- Deliver long-term annual EPS growth of 6% to 8% based off of $3.55 per share (the mid-point of 2024 original ongoing earnings guidance of $3.50 to $3.60 per share).
- Deliver annual dividend increases of 4% to 6%.
- Target a dividend payout ratio of 50% to 60%.
- Maintain senior secured debt credit ratings in the A range.

## Controls and procedures

As filed, 2,154 characters.

### Disclosure Controls and Procedures

Xcel Energy maintains a set of disclosure controls and procedures designed to ensure that information required to be disclosed in reports that it files or submits under the Securities Exchange Act of 1934 is recorded, processed, summarized, and reported within the time periods specified in SEC rules and forms. In addition, the disclosure controls and procedures ensure that information required to be disclosed is accumulated and communicated to management, including the CEO and CFO, allowing timely decisions regarding required disclosure.

As of Dec. 31, 2024, based on an evaluation carried out under the supervision and with the participation of Xcel Energy’s management, including the CEO and CFO, of the effectiveness of its disclosure controls and procedures, the CEO and CFO have concluded that Xcel Energy’s disclosure controls and procedures were effective.

### Internal Control Over Financial Reporting

No changes in Xcel Energy’s internal control over financial reporting occurred during the most recent fiscal quarter ended Dec. 31, 2024 that materially affected, or are reasonably likely to materially affect, Xcel Energy’s internal control over financial reporting. Xcel Energy maintains internal control over financial reporting to provide reasonable assurance regarding the reliability of the financial reporting. Xcel Energy has evaluated and documented its controls in process activities, general computer activities, and on an entity-wide level.

During the year and in preparation for issuing its report for the year ended Dec. 31, 2024 on internal controls under section 404 of the Sarbanes-Oxley Act of 2002, Xcel Energy conducted testing and monitoring of its internal control over financial reporting. Based on the control evaluation, testing and remediation performed, Xcel Energy did not identify any material control weaknesses, as defined under the standards and rules issued by the Public Company Accounting Oversight Board, as approved by the SEC and as indicated in Xcel Energy’s Management Report on Internal Controls over Financial Reporting, which is contained in Item 8 herein.