# Tutor Perini Corp: Form 10-Q for the period ended Jun 30, 2021

- Company: [Tutor Perini Corp](/companies/tpc.md) (CIK 77543)
- Form: 10-Q
- Filed: 2021-08-04
- Accepted by EDGAR: Aug 4, 2021, 17:04 ET
- Period: 2021-06-30
- Accession: 0000077543-21-000074
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/77543/000007754321000074/tpc-20210630.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/77543/000007754321000074/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2021-06-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2021-04-01 to 2021-06-30 | $1.22bn | us-gaap:RevenueFromContractWithCustomerExcludingAssessedTax |
| Revenue | 6 months, 2021-01-01 to 2021-06-30 | $2.43bn | us-gaap:RevenueFromContractWithCustomerExcludingAssessedTax |
| Cost of revenue | 3 months, 2021-04-01 to 2021-06-30 | $1.09bn | us-gaap:CostOfGoodsAndServicesSold |
| Cost of revenue | 6 months, 2021-01-01 to 2021-06-30 | $2.19bn | us-gaap:CostOfGoodsAndServicesSold |
| Gross profit | 3 months, 2021-04-01 to 2021-06-30 | $127.5m | us-gaap:GrossProfit |
| Gross profit | 6 months, 2021-01-01 to 2021-06-30 | $237.9m | us-gaap:GrossProfit |
| Operating income | 3 months, 2021-04-01 to 2021-06-30 | $68.8m | us-gaap:OperatingIncomeLoss |
| Operating income | 6 months, 2021-01-01 to 2021-06-30 | $118.5m | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2021-04-01 to 2021-06-30 | $17.9m | us-gaap:InterestExpense |
| Interest expense | 6 months, 2021-01-01 to 2021-06-30 | $35.7m | us-gaap:InterestExpense |
| Income tax | 3 months, 2021-04-01 to 2021-06-30 | $10.6m | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 6 months, 2021-01-01 to 2021-06-30 | $17.6m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2021-04-01 to 2021-06-30 | $31.2m | us-gaap:NetIncomeLoss |
| Net income | 6 months, 2021-01-01 to 2021-06-30 | $47.2m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2021-04-01 to 2021-06-30 | $0.61 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 6 months, 2021-01-01 to 2021-06-30 | $0.92 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2021-04-01 to 2021-06-30 | $0.61 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 6 months, 2021-01-01 to 2021-06-30 | $0.93 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2021-04-01 to 2021-06-30 | 51,375,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 6 months, 2021-01-01 to 2021-06-30 | 51,362,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 6 months, 2021-01-01 to 2021-06-30 | −$131.3m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 3 months, 2021-04-01 to 2021-06-30 | $9.0m | us-gaap:PaymentsToAcquireProductiveAssets |
| Capital expenditure | 6 months, 2021-01-01 to 2021-06-30 | $18.9m | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Cash and equivalents | at 2021-06-30 | $231.1m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2021-06-30 | $3.98bn | us-gaap:AssetsCurrent |
| Total assets | at 2021-06-30 | $4.89bn | us-gaap:Assets |
| Current liabilities | at 2021-06-30 | $2.03bn | us-gaap:LiabilitiesCurrent |
| Total liabilities | at 2021-06-30 | $3.28bn | us-gaap:Liabilities |
| Long-term debt | at 2021-06-30 | $933.3m | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2021-06-30 | $36.9m | us-gaap:DebtCurrent |
| Shareholders' equity | at 2021-06-30 | $1.60bn | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 37,238 characters.

The following discusses our financial position as of June 30, 2021 and the results of our operations for the three and six months ended June 30, 2021 and should be read in conjunction with other information, including the unaudited Condensed Consolidated Financial Statements and notes included in Part I, Item 1, Financial Information, of this Quarterly Report on Form 10‑Q, the audited consolidated financial statements and accompanying notes to our Annual Report on Form 10‑K for the year ended December 31, 2020, and the information contained under the heading “Risk Factors” in our Annual Report on Form 10‑K for the year ended December 31, 2020 and in Part II, Item 1A below.

### Forward-Looking Statements

This Quarterly Report on Form 10‑Q, including the “Management’s Discussion and Analysis of Financial Condition and Results of Operations,” contains forward-looking statements regarding future events and our future results, which are intended to be covered by the safe harbor provision for forward-looking statements provided by the Private Securities Litigation Reform Act of 1995. All statements other than statements of historical facts are statements that could be deemed forward-looking statements. Words such as “achieve,” “anticipate,” “assumes,” “believes,” “continue,” “could,” “estimate,” “expects,” “forecast,” “hope,” “intend,” “may,” “plan,” “potential,” “predict,” “should,” “will,” “would,” variations of such words and similar expressions are intended to identify such forward-looking statements. In addition, any statements that refer to projections of our future financial performance, our anticipated growth and trends in our businesses, and other characterizations of future events or circumstances are forward-looking statements. Although such statements are based on currently available financial and economic data, as well as management’s estimates and expectations, forward-looking statements are inherently uncertain and involve risks and uncertainties that could cause our actual results to differ materially from what may be inferred from the forward-looking statements. Therefore, actual results may differ materially and adversely from those expressed in any forward-looking statements. Factors potentially contributing to such differences include, among others:

- The impact of the COVID-19 pandemic and related events that are beyond our control, including possible effects on our business and operations, customers and suppliers, and employees, contractors and subcontractors, which could affect adversely our projects and the geographic regions in which we conduct business;
- Revisions of estimates of contract risks, revenue or costs; the timing of new awards; the pace of project execution; or economic factors, including inflation, may result in losses or lower than anticipated profit;
- Unfavorable outcomes of existing or future litigation or dispute resolution proceedings against customers (project owners, developers, general contractors, etc.), subcontractors or suppliers, as well as failure to promptly recover significant working capital invested in projects subject to such matters;
- The requirement to perform extra, or change order, work resulting in disputes or claims or adversely affecting our working capital, profits and cash flows;
- Increased competition and failure to secure new contracts;
- A significant slowdown or decline in economic conditions;
- Risks and other uncertainties associated with assumptions and estimates used to prepare financial statements;
- Inability to retain key members of our management, to hire and retain personnel required to complete projects or implement succession plans for key officers;
- Failure to meet contractual schedule requirements, which could result in higher costs and reduced profits or, in some cases, exposure to financial liability for liquidated damages and/or damages to customers;
- Client cancellations of, or reductions in scope under, contracts reported in our backlog;
- Possible systems and information technology interruptions, including due to cyberattack, systems failures or other similar events;
- Decreases in the level of government spending for infrastructure and other public projects;
- Failure of our joint venture partners to perform their venture obligations, which could impose additional financial and performance obligations on us, resulting in reduced profits or losses and/or reputational harm;
- Economic, political, regulatory and other risks, including civil unrest, security issues, labor conditions, corruption and other unforeseeable events in countries where we do business, resulting in unanticipated losses;
- The impact of inclement weather conditions on projects;
- Risks related to government contracts and related procurement regulations;
- Violations of the U.S. Foreign Corrupt Practices Act and similar worldwide anti-bribery laws;
- Adverse health events, such as an epidemic or a pandemic;
- Failure to meet our obligations under our debt agreements;
- Downgrades in our credit ratings;
- Impairment of our goodwill or other indefinite-lived intangible assets; and
- Uncertainty from the expected discontinuance of the London Interbank Offered Rate (“LIBOR”) and transition to any other interest rate benchmark.

### Executive Overview

### COVID-19 Update

Since the onset of the COVID-19 pandemic in early 2020, the pandemic has caused occasional shortages in available manpower, reductions in field labor productivity, other inefficiencies, delays to project schedules and deferrals of project execution. As a result, we continue to incur incremental costs, much of which we are seeking to recover from our customers as allowed by contractual terms. The relief sought from customers, some of which has already been received, together with certain incremental project opportunities that resulted from the pandemic, has helped to mitigate the pandemic's negative impact on our financial results. In addition, we continue to experience delays in certain legal proceedings, as well as delays in certain settlement discussions where we have claims against project owners for additional costs exceeding the contract price or for amounts not included in the original contract price. These delays in resolving and recovering on such claims continue to adversely affect our liquidity and financial results.

The vast majority of our projects, especially in the Civil segment, have been and continue to be considered essential business activities, which has allowed projects to continue while implementing new health and safety requirements. However, the COVID-19 pandemic has had an adverse effect on the volume and timing of our new awards and, correspondingly, our backlog. Many of our state and local government customers’ revenue sources were negatively impacted by the pandemic due to severely curtailed ridership on mass-transit systems (buses, subways, trains, etc.), travel on commercial airlines, and driving by the general public, which resulted in reduced fare and toll collections, lower fuel tax receipts and reduced airport and other facility usage fees. Sales and other tax revenues were also negatively affected by reduced spending, as the retail, travel, hospitality and entertainment industries, among others, suffered through periodic government-imposed shut-downs or occupancy restrictions. Such restrictions have gradually been easing over the past several months, but are being reinstated in some locations due to increasing COVID-19 case rates largely driven by the newer Delta variant. The tax revenue shortfalls led to, and could continue to result in, funding uncertainties that have caused customers to delay bid solicitations and contract awards for many of their planned infrastructure projects. Our reduced backlog combined with the possibility of continued pandemic-related delays in project bids and awards could result in lower-than-expected revenue and earnings until such time as the federal government provides supplemental funding support to our customers (should that occur) or when customers’ funding uncertainties are otherwise resolved. The Biden Administration is currently working to secure congressional passage of a large-scale infrastructure funding bill, which, if passed, is expected to provide substantial incremental funding for various infrastructure projects nationwide over a multi-year period.

COVID-19 vaccination coverage has broadened considerably across the United States since the vaccines were first approved and became available in late 2020, but progress in vaccination rates has slowed. While the vaccines generally have been reported to be highly effective against the original COVID-19 virus strain, their effectiveness against variants, including the Delta variant, is the subject of evolving and sometimes conflicting information. The duration of effectiveness of the vaccines, as well as their effectiveness against future variants is uncertain. As such, due to the fluidity of the COVID-19 pandemic, uncertainties as to its scope and duration, and ongoing changes in the way that governments, businesses and individuals react and respond to the pandemic, the Company is unable at this time to accurately predict the pandemic’s future impact on the Company’s business, results of operations, financial condition or liquidity.

### Operating Results

Consolidated revenue for the three and six months ended June 30, 2021 was $1.22 billion and $2.43 billion, respectively, compared to $1.28 billion and $2.53 billion for the same periods in 2020. The slight decrease for both periods was primarily due to reduced project execution activities in the Building segment, partially offset by increased volume in the Specialty Contractors segment. Revenue for both periods of 2020 and 2021 was negatively impacted by the COVID-19 pandemic, which has resulted in delays in new awards and the execution of certain projects.

Despite the modest revenue decline for both periods, income from construction operations increased to $68.8 million and $118.5 million for the three and six months ended June 30, 2021, respectively, compared to $57.7 million and $104.9 million for the same periods in 2020. The increase for both periods was primarily driven by improved overall results in the Specialty Contractors segment mostly due to the resolution of various contract disputes that had a net favorable impact in 2021 and the absence of the impact of an unfavorable arbitration ruling in 2020, as well as increased profitability in the Civil segment due to a continued shift towards higher-margin projects. The increase was partially offset by unfavorable results in the Building segment.

The effective tax rate was 20.4% and 20.9% for the three and six months ended June 30, 2021, respectively, compared to 23.7% and 20.5% for the comparable periods in 2020. See *Corporate, Tax and Other Matters* below for a discussion of the change in the effective tax rate.

Net income attributable to the Company for the three and six months ended June 30, 2021 was $31.2 million and $47.2 million, respectively, compared to $18.7 million and $36.1 million for the same periods in 2020. Diluted earnings per common share for the three and six months ended June 30, 2021 was $0.61 and $0.92, respectively, compared to diluted earnings per common share of $0.37 and $0.71 for the same periods in 2020. The increase in net income attributable to the Company, and correspondingly EPS, for both periods was primarily due to the factors discussed above that drove the increase in income from construction operations and lower net income attributable to noncontrolling interests for the current-year periods compared to the same periods in 2020. For the three months ended June 30, 2021, the increase in net income attributable to the Company was also due to a lower effective income tax rate as compared to the 2020 period.

Consolidated new awards for the three and six months ended June 30, 2021 totaled $0.6 billion and $1.6 billion, respectively, compared to $0.7 billion and $1.3 billion for the same periods in 2020. The Building segment was the primary contributor to the new award activity in the second quarter of 2021. The most significant new awards in the second quarter of 2021 included a $152 million courthouse project in California and $88 million for various civil projects in the Midwest. The Company anticipates booking several significant new awards into backlog in the third quarter of 2021, including the $471 million LAX Airport Metro Connector project, the $220 million I-70 Missouri River Bridge project and a significant new health care facility project in California.

Consolidated backlog as of June 30, 2021 was $7.5 billion, down 10% compared to $8.3 billion at December 31, 2020. As of June 30, 2021, the mix of backlog by segment was approximately 58% for Civil, 22% for Building and 20% for Specialty Contractors. The decline in backlog as of June 30, 2021 was a result of revenue that solidly outpaced the volume of new awards. The COVID-19 pandemic has negatively impacted the volume and timing of new awards in recent quarters.

The following table presents the Company’s backlog by business segment, reflecting changes from December 31, 2020 to June 30, 2021:

*(in millions)*

|  | Backlog at December 31, 2020 | New Awards(a) | Revenue Recognized | Backlog at June 30, 2021(b) |
| --- | ---: | ---: | ---: | ---: |
| Civil | $4,783.6 | $576.3 | $(1,030.9) | $4,329.0 |
| Building | 1,702.3 | 730.3 | (789.9) | 1,642.7 |
| Specialty Contractors | 1,859.8 | 294.9 | (606.0) | 1,548.7 |
| Total | $8,345.7 | $1,601.5 | $(2,426.8) | $7,520.4 |

(a) New awards consist of the original contract price of projects added to backlog plus or minus subsequent changes to the estimated total contract price of existing contracts.

(b) Backlog may differ from the transaction prices allocated to the remaining performance obligations as disclosed in Note 3 of the Notes to Condensed Consolidated Financial Statements. Such differences relate to the timing of executing a formal contract or receiving a notice to proceed. More specifically, backlog sometimes may include awards for which a contract has not yet been executed or a notice to proceed has not been issued, but for which there are no remaining major uncertainties that the project will proceed (e.g., adequate funding is in place).

The Company is unable to predict the future impacts of the COVID-19 pandemic, due to, among other things, the uncertainty of vaccination coverage, infection rates, the duration of effectiveness of vaccinations, their effectiveness against current and future variants and how government entities and our customers respond to these factors. The outlook for the Company’s growth over the next several years remains favorable, particularly in the Civil and Specialty Contractors segments, but the impact of the COVID-19 pandemic could continue to adversely affect future performance and operations, and the amount and timing of new work awarded. In addition, the Company’s growth could continue to be impacted by future project delays or the timing of project commencements, ramp-up activities and completions. We anticipate that we will continue to win our share of significant new awards resulting from long-term capital spending plans by state, local and federal customers, as well as limited competition for some of the largest project opportunities. In elections over the past several years, voters in numerous states approved dozens of long-term transportation funding measures totaling approximately $200 billion in long-term funding. The largest of these was in Los Angeles County, where Measure M, a half-cent sales tax increase, was approved and is expected to generate $120 billion of funding over 40 years. In Seattle, Washington, Sound Transit 3 was passed and is expected to generate $54 billion of funding over 25 years. Interest rates have remained at historically low levels, which may be conducive to continued, and potentially increased, spending on infrastructure projects.

There has long been strong, bipartisan support for infrastructure investments in the United States. Given the lack of substantial federal infrastructure spending over the past few decades and the negative economic impacts of the COVID-19 pandemic, there is currently a strong focus by the Biden Administration and congressional leaders to secure passage of a significant infrastructure bill. Should an infrastructure bill be approved, any substantial incremental federal funding, such as what is currently being contemplated, could directly and favorably impact the Company’s current work and prospective opportunities. The timing and content of such legislation, if any is adopted, and the amount of spending funded by it remain uncertain.

While we anticipate overall steady revenue in 2021 supported by our existing backlog of large civil projects on the West Coast and in Guam, certain large civil projects in the Northeast are completing or will be nearing completion in 2021. The Company is pursuing several large prospective projects on the West Coast, in the Northeast and in Guam that are expected to be bid and awarded later this year and in 2022. However, revenue could decline in 2021 because the timing and magnitude of revenue contributions from these prospective projects may not be sufficient to offset revenue reductions associated with the projects that will be completed or progressing toward completion in 2021. In addition, as discussed earlier, the COVID-19 pandemic has resulted in, and could continue to result in, delays in the bidding and awarding of certain projects the Company is pursuing, which could further delay large new revenue streams.

For a more detailed discussion of operating performance of each business segment, corporate general and administrative expenses and other items, see *Results of Segment Operations, Corporate, Tax and Other Matters* and *Liquidity and Capital Resources* below.

### Results of Segment Operations

The results of our Civil, Building and Specialty Contractors segments are discussed below.

### Civil Segment

Revenue and income from construction operations for the Civil segment are summarized as follows:

*(in millions)*

|  | Three Months Ended June 30, 2021 | 2020 | Six Months Ended June 30, 2021 | 2020 |
| --- | ---: | ---: | ---: | ---: |
| Revenue | $555.4 | $569.0 | $1,030.9 | $1,055.6 |
| Income from construction operations | 75.1 | 65.4 | 125.2 | 111.5 |

Revenue for both the three and six months ended June 30, 2021 decreased 2% compared to the same periods in 2020.

Despite the slight revenue decline for both periods of 2021, income from construction operations for the three and six months ended June 30, 2021 increased 15% and 12%, respectively, compared to the same periods in 2020. The increase for both periods was primarily due to contributions from certain higher-margin projects. For the six-month period of 2021, the increase was partially offset by net volume reductions mostly related to certain projects that have completed or are nearing completion.

Operating margin was 13.5% and 12.1% for the three and six months ended June 30, 2021, respectively, compared to 11.5% and 10.6% for the same periods in 2020. The margin increases for both periods of 2021 reflect the segment’s continued shift towards higher-margin projects.

New awards in the Civil segment totaled $119 million and $576 million for the three and six months ended June 30, 2021, respectively, compared to $377 million and $555 million for the same periods in 2020. The volume of new awards in the second quarter of 2021 declined due to the timing of new project bids and awards. However, the Company anticipates booking the $220 million I-70 Missouri River Bridge project into backlog in the third quarter of 2021 and also has several large Civil segment opportunities that are expected to bid and/or potentially be awarded to the Company later this year and in 2022. The COVID-19 pandemic has resulted in significant revenue shortfalls for many state and local government agencies since 2020, and may continue to cause the deferrals or cancellations of certain new projects, depending on the allocation and prioritization of state and local funding, as well as the availability, timing and magnitude of anticipated funding from the federal government.

Backlog for the Civil segment was $4.3 billion as of June 30, 2021 compared to $5.5 billion as of June 30, 2020. The decrease has been the result of relatively fewer and smaller new awards over the past six months primarily due to the timing of upcoming bids for large prospective projects and impacts from the COVID-19 pandemic on new awards. The segment continues to experience strong demand reflected in a large, multi-year pipeline of prospective projects, substantial anticipated funding from various voter-approved transportation measures and public agencies’ long-term spending plans. The Civil segment is well-positioned to continue capturing its share of these prospective projects.

### Building Segment

Revenue and income (loss) from construction operations for the Building segment are summarized as follows:

*(in millions)*

|  | Three Months Ended June 30, 2021 | 2020 | Six Months Ended June 30, 2021 | 2020 |
| --- | ---: | ---: | ---: | ---: |
| Revenue | $382.7 | $473.0 | $789.9 | $954.8 |
| Income (loss) from construction operations | (2.5) | 17.8 | 8.7 | 21.3 |

Revenue for the three and six months ended June 30, 2021 decreased 19% and 17%, respectively, compared to the same periods in 2020, primarily due to reduced project execution activities on certain projects that are completed or nearing completion, partially offset by increased activity in the current year related to work that had been deferred by the COVID-19 pandemic on a technology project in California in the prior year.

Loss from construction operations for the second quarter of 2021 was $2.5 million and income from construction operations for the six months ended June 30, 2021 was $8.7 million, compared to income from construction operations of $17.8 million and $21.3 million for the three and six months ended June 30, 2020, respectively. The change for both periods was principally due to unfavorable adjustments on certain projects, which were immaterial individually and in the aggregate, as well as the volume reductions mentioned above.

Operating margin was (0.7)% and 1.1% for the three and six months ended June 30, 2021, respectively, compared to 3.8% and 2.2% for the same periods in 2020. The decreases were due to the above-mentioned factors that drove the changes in revenue and income (loss) from construction operations.

New awards in the Building segment totaled $386 million and $730 million for the three and six months ended June 30, 2021, respectively, compared to $260 million and $443 million for the same periods in 2020. The most significant new awards in the second quarter of 2021 were a $152 million courthouse project in California and a $43 million government facility project in Mississippi. As mentioned above in *Executive Overview*, the Company anticipates booking the $471 million LAX Airport Metro Connector project, as well as a significant new health care facility project in California, into backlog in the third quarter of 2021.

Backlog for the Building segment was $1.6 billion as of June 30, 2021 compared to $2.3 billion as of June 30, 2020. The decrease was driven by revenue that exceeded the volume of new awards over the past six months, as the COVID-19 pandemic delayed certain new awards for prospective projects. The Building segment continues to have a large volume of prospective projects across various end markets and geographic locations. We expect demand to grow as economic conditions improve and customer spending increases, which continue to be supported by a historically low interest rate environment. However, the COVID-19 pandemic has resulted in, and could continue to result in, reduced demand for our building construction services.

### Specialty Contractors Segment

Revenue and income (loss) from construction operations for the Specialty Contractors segment are summarized as follows:

*(in millions)*

|  | Three Months Ended June 30, 2021 | 2020 | Six Months Ended June 30, 2021 | 2020 |
| --- | ---: | ---: | ---: | ---: |
| Revenue | $281.2 | $234.4 | $606.0 | $516.8 |
| Income (loss) from construction operations | 10.0 | (11.4) | 11.3 | (3.1) |

Revenue for the three and six months ended June 30, 2021 increased 20% and 17%, respectively, compared to the same periods in 2020. The growth for both periods was principally driven by increased project execution activities on certain projects in the Northeast.

Income from construction operations for the three and six months ended June 30, 2021 was $10.0 million and $11.3 million, respectively, compared to a loss from construction operations of $11.4 million and $3.1 million for the comparable periods in 2020. The increase for both periods of 2021 was primarily due to a $20.1 million favorable adjustment related to a legal judgment on a completed electrical project in New York, partially offset by unfavorable adjustments in the second quarter of 2021 related to the resolution of disputes on certain electrical and mechanical projects in New York, which were immaterial individually and in the aggregate. The increase was also driven by the absence of a $13.2 million prior-year second-quarter impact from an adverse arbitration ruling related to another electrical project in New York.

Operating margin was 3.5% and 1.9% and for the three and six months ended June 30, 2021, respectively, compared to (4.9)% and (0.6)% for the same periods in 2020. The increases in operating margin were principally due to the aforementioned factors that drove the changes in revenue and income (loss) from construction operations.

New awards in the Specialty Contractors segment totaled $137 million and $295 million for the three and six months ended June 30, 2021, respectively, compared to $81 million and $306 million for the same periods in 2020. The COVID-19 pandemic has resulted in, and could continue to result in, reduced demand from certain commercial and government customers that have been experiencing funding constraints.

Backlog for the Specialty Contractors segment was $1.5 billion as of June 30, 2021 compared to $2.2 billion as of June 30, 2020. The decrease was driven by revenue that exceeded the volume of new awards over the past six months, as new awards have continued to be negatively impacted by the COVID-19 pandemic. The Specialty Contractors segment continues to be increasingly focused on servicing the Company’s backlog of large Civil and Building segment projects, but also remains well-positioned to capture its share of new projects for external customers, leveraging the size and scale of our business units that operate in New York, Texas, Florida and California and the strong reputation held by these business units for high-quality work on large, complex projects.

### Corporate, Tax and Other Matters

### Corporate General and Administrative Expenses

Corporate general and administrative expenses were $13.8 million and $26.7 million during the three and six months ended June 30, 2021, respectively, compared to $14.1 million and $24.8 million during the three and six months ended June 30, 2020, respectively.

### Other Income (Expense), Interest Expense and Income Tax Expense

*(in millions)*

|  | Three Months Ended June 30, 2021 | 2020 | Six Months Ended June 30, 2021 | 2020 |
| --- | ---: | ---: | ---: | ---: |
| Other income (expense) | $1.4 | $(0.8) | $1.6 | $(0.3) |
| Interest expense | (17.9) | (16.5) | (35.7) | (32.9) |
| Income tax expense | (10.6) | (9.6) | (17.6) | (14.7) |

The effective tax rate was 20.4% and 20.9% for the three and six months ended June 30, 2021, respectively, compared to 23.7% and 20.5% for the same periods in 2020, respectively. The higher effective income tax rate for the six months ended June 30, 2021 is primarily due to the absence of the favorable rate impact recognized in the 2020 period from the net operating loss carryback as a result of the Coronavirus Aid, Relief, and Economic Security Act, which was partially offset by unfavorable share-based compensation expense adjustments. The effective income tax rates for the three and six months ended June 30, 2021 were favorably impacted by lower state income taxes compared to the same periods in 2020. For a further discussion of income taxes, refer to Note 7 of the Notes to Condensed Consolidated Financial Statements.

### Liquidity and Capital Resources

Liquidity is provided by available cash and cash equivalents, cash generated from operations, credit facilities and access to capital markets. We have a committed line of credit totaling $175 million, which may be used for revolving loans, letters of credit and/or general purposes. We believe that cash generated from operations, along with our unused credit capacity of $175 million and available cash balances as of June 30, 2021, will be sufficient to fund any working capital needs and debt maturities for the next 12 months, provided that we are not adversely impacted by unanticipated future events, including further impacts related to the COVID-19 pandemic as discussed above in *COVID-19 Update.*

### Cash and Working Capital

Cash and cash equivalents were $231.1 million as of June 30, 2021 compared to $374.3 million as of December 31, 2020. Cash immediately available for general corporate purposes was $103.5 million and $210.8 million as of June 30, 2021 and December 31, 2020, respectively, with the remainder being amounts held by our consolidated joint ventures and also our proportionate share of cash held by our unconsolidated joint ventures. Cash held by our joint ventures was available only for joint venture-related uses, including distributions to joint venture partners. In addition, our restricted cash and restricted investments totaled $88.4 million as of June 30, 2021 compared to $156.5 million as of December 31, 2020. Restricted cash and restricted investments at June 30, 2021 were primarily held to secure insurance-related contingent obligations. Restricted cash as of December 31, 2020 also included cash held to repay the $69.9 million outstanding principal balance of the Convertible Notes, which were repaid at maturity on June 15, 2021 (see Note 9 of the Notes to Condensed Consolidated Financial Statements).

During the six months ended June 30, 2021, net cash used in operating activities was $131.3 million, due primarily to investments in project working capital partially offset by cash generated from earnings sources. The increase in working capital for the first six months of 2021 primarily reflects an increase in costs and estimated earnings in excess of billings (“CIE”), a decrease in accounts payable due to timing of payments to suppliers and subcontractors and a decrease in billings in excess of costs and estimated earnings (“BIE”). The increase in CIE was primarily due to the follow-on impacts of the COVID-19 pandemic, which has caused delays in the negotiation and resolution of certain claims and unapproved change orders (due to the postponement or deferrals of certain legal and arbitration proceedings and settlement discussions), and constrained customers’ revenue and funding sources, thereby limiting their budgetary discretion to pay the Company for changes approved in scope but for which pricing is pending. During the six months ended June 30, 2020, net cash provided by operating activities was $58.2 million due primarily to cash generated from earnings sources, partially offset by investment in working capital. The increase in working capital for the first six months of 2020 primarily reflected an increase in accounts receivable due to timing of collections, partially offset by increases in BIE and accounts payable due to timing of payments to suppliers and subcontractors.

Cash flow from operating activities decreased $189.5 million when comparing the first six months of 2021 with the same period of 2020. The decrease in cash from operating activities in the first six months of 2021 compared to 2020 substantially reflects an increase in investment in working capital primarily as a result of a current-year decrease in accounts payable compared to an increase in the prior year due to timing of payments to vendors and subcontractors, a current-year decrease in BIE compared to an increase in the prior year and a larger current-year increase in CIE compared to the prior year, partially offset by a current-year decrease in accounts receivable compared to an increase in the prior year.

Cash used in investing activities during the first six months of 2021 was $22.8 million primarily due to the acquisition of property and equipment for projects totaling $18.9 million, as well as net cash used in investment transactions of $7.6 million. Cash used in investing activities during the first six months of 2020 was $32.6 million, primarily due to the acquisition of property and equipment for projects.

Net cash used in financing activities was $63.7 million for the first six months of 2021, which was primarily driven by a $58.8 million net repayment of borrowings, including the repayment of the remaining principal balance of the Convertible Notes, and $3.2 million of net distributions to noncontrolling interests. Net cash used in financing activities for the comparable period in 2020 was $36.2 million, which was primarily driven by $30.9 million of cash distributions to noncontrolling interests and a $4.3 million net repayment of borrowings.

At June 30, 2021, we had working capital of $2.0 billion, a ratio of current assets to current liabilities of 1.96 and a ratio of debt to equity of 0.60, compared to working capital of $1.8 billion, a ratio of current assets to current liabilities of 1.80 and a ratio of debt to equity of 0.66 at December 31, 2020.

### Debt

#### 2020 Credit Agreement

On August 18, 2020, the Company entered into a credit agreement (the “2020 Credit Agreement”) with BMO Harris Bank N.A., as Administrative Agent, Swing Line Lender and L/C Issuer and other lenders. The 2020 Credit Agreement provides for a $425.0 million term loan B facility (the “Term Loan B”) and a $175.0 million revolving credit facility (the “2020 Revolver”), with sublimits for the issuance of letters of credit and swing line loans up to the aggregate amounts of $75.0 million and $10.0 million, respectively. The Term Loan B will mature on August 18, 2027 and the 2020 Revolver will mature on August 18, 2025, in each case, unless any of the 2017 Senior Notes are outstanding on January 30, 2025 (which is 91 days prior to the maturity of the 2017 Senior Notes), in which case, both the Term Loan B and the 2020 Revolver will mature on January 30, 2025 (subject to certain further exceptions). For more information regarding the terms of our 2020 Credit Agreement, refer to Note 9 of the Notes to Condensed Consolidated Financial Statements.

The table below presents our actual and required consolidated first lien net leverage ratio under the 2020 Credit Agreement for the period, which is calculated on a rolling four-quarter basis:

|  | Trailing Four Fiscal Quarters Ended |  |
| --- | --- | --- |
|  | **June 30, 2021** |  |
|  | **Actual** | **Required** |
| First lien net leverage ratio | 0.94 to 1.00 | ≤ 2.75 : 1.00 |

As of June 30, 2021, we were in compliance and expect to continue to be in compliance with the covenants under the 2020 Credit Agreement.

#### Repurchase and Repayment of Convertible Notes

On June 15, 2016, the Company issued $200 million of 2.875% Convertible Senior Notes due June 15, 2021 (the “Convertible Notes”) in a private placement offering. On August 19, 2020, the Company used proceeds from the Term Loan B to repurchase $130.1 million aggregate principal amount of the Convertible Notes for an aggregate purchase price of $132.4 million (including accrued and unpaid interest to the repurchase date). The Company repaid the remaining principal balance of the Convertible Notes at maturity on June 15, 2021 using proceeds from the Term Loan B which were held in a restricted cash account for this purpose. None of the Convertible Notes remained outstanding as of June 30, 2021.

### Contractual Obligations

Aside from the *Debt* discussion above, there have been no material changes in our contractual obligations from those described in our Annual Report on Form 10‑K for the year ended December 31, 2020.

### Off-Balance Sheet Arrangements

None.

### Critical Accounting Policies

Our significant accounting policies are described in Note 1 of the Notes to Consolidated Financial Statements included in our Annual Report on Form 10‑K for the year ended December 31, 2020. Our critical accounting policies are also identified and discussed in Item 7 of our Annual Report on Form 10‑K for the year ended December 31, 2020.

### Recently Issued Accounting Pronouncements

See Note 2 of the Notes to Condensed Consolidated Financial Statements.

## Market risk

As filed, 167 characters.

There has been no material change in our exposure to market risk from that described in Item 7A of our Annual Report on Form 10‑K for the year ended December 31, 2020.

## Controls and procedures

As filed, 1,542 characters.

### Disclosure Controls and Procedures

An evaluation of the effectiveness of the design and operation of our disclosure controls and procedures as defined by Rule 13a-15(e) under the Securities Exchange Act of 1934, as amended (“Exchange Act”), as of the end of the period covered by this Quarterly Report on Form 10‑Q was made under the supervision and with the participation of our management, including our Chief Executive Officer and Chief Financial Officer. Based upon that evaluation, the Chief Executive Officer and Chief Financial Officer concluded that the Company’s disclosure controls and procedures (a) were effective to ensure that information we are required to disclose in reports that we file or submit under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in Securities and Exchange Commission rules and forms and (b) include, without limitation, controls and procedures designed to ensure that information required to be disclosed by us in reports filed or submitted under the Exchange Act is accumulated and communicated to our management, including our Chief Executive Officer and Chief Financial Officer, as appropriate, to allow timely decisions regarding required disclosure.

### Changes in Internal Control Over Financial Reporting

There were no changes in our internal control over financial reporting during the period covered by this report that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.

## Risk factors

As filed, 1,599 characters.

The following risk factor updates and replaces the risk factor under the same heading previously disclosed in our Annual Report on Form 10-K for the year ended December 31, 2020.

**If we are unable to accurately estimate contract risks, revenue or costs, the timing of new awards, or the pace of project execution, we may incur a loss or achieve lower than anticipated profit.**

Accounting for contract-related revenue and costs requires management to make significant estimates and assumptions that may change substantially throughout the project lifecycle, which has previously resulted, and in the future could result, in a material impact to our consolidated financial statements. In addition, cost overruns, including unanticipated cost increases on fixed price and guaranteed maximum price contracts, have previously resulted, and in the future may result, in lower profits or losses. Economic factors, including inflation, could also subject us to higher costs, which we may not be able to fully recover in future projects that we are bidding, and may also decrease profit on our existing contracts, in particular with respect to our fixed price, unit price and guaranteed maximum price contracts. Changes in laws, policies or regulations, including tariffs and taxes, have previously impacted, and in the future could impact, the prices for materials or equipment. Further, our results of operations have historically fluctuated, and may continue to fluctuate, quarterly and annually depending on when new awards occur and the commencement and progress of work on projects already awarded.

Filed Aug 4, 2021.
Source: SEC EDGAR, the filing index for accession 0000077543-21-000074. Last ingested by Listed: Nov 15, 2026, 00:46 ET. No prices; not investment advice.