# VSE Corp: Form 10-Q for the period ended Mar 31, 2011

- Company: [VSE Corp](/companies/vsec.md) (CIK 102752)
- Form: 10-Q
- Filed: 2011-04-29
- Accepted by EDGAR: Apr 29, 2011, 10:44 ET
- Period: 2011-03-31
- Accession: 0000102752-11-000024
- Inline XBRL: no
- Main document: https://www.sec.gov/Archives/edgar/data/102752/000010275211000024/vseform10q1_2011.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/102752/000010275211000024/

## Management's discussion and analysis

As filed, 33,705 characters.

### Executive Overview

### Organization

Our business is focused on providing sustainment services for U.S. Department of Defense ("DoD") legacy systems and equipment and professional services to DoD and Federal Civilian agencies. Our operations consist primarily of logistics, engineering, equipment refurbishment, supply chain management, IT solutions, health care IT, construction management and consulting services performed on a contract basis. Substantially all of our contracts are with United States Government (“government”) agencies and other government prime contractors.

Our business is managed under operating groups consisting of one or more divisions or wholly owned subsidiaries that perform our services. Our Federal Group operations are conducted by our Communications and Engineering Division ("CED"), Engineering and Logistics Division ("ELD"), Field Support Services Division (“FSS”), and Systems Engineering Division ("SED"). Our International Group operations are conducted by our GLOBAL Division ("GLOBAL") and Fleet Maintenance Division ("FMD"). Our IT, Energy and Management Consulting Group operations are conducted by our wholly owned subsidiaries Energetics Incorporated ("Energetics"), G&B Solutions, Inc. (“G&B”), and, since August 19, 2010, Akimeka, LLC (“Akimeka”). Our Infrastructure Group operations are conducted by our wholly owned subsidiary Integrated Concepts and Research Corporation (“ICRC”).

### Segments

Our operations are conducted within four reportable segments aligned with our management groups: 1) Federal; 2) International; 3) IT, Energy and Management Consulting; and 4) Infrastructure.

**Federal Group** - Our Federal Group provides engineering, technical, management, and integrated logistics support services to U.S. military branches and other government agencies.

**CED** - CED is dedicated to the management and execution of the U.S. Army CECOM's Rapid Response (“R2”) Program, which supports clients across DoD and the government. CED manages execution of tasks involving research and development, technology insertion, systems integration and engineering, hardware/software fabrication and installation, testing and evaluation, studies and analysis, technical data management, logistics support, training and acquisition support. A substantial portion of our revenue on the R2 contract results from the pass-through of subcontractor support services that have a low profit margin. A large portion of the work on this program is related to the U.S. military involvement in the Middle East and Asia. The contract supporting the R2 Program expired in January 2011. Significant revenue generating programs that we have performed under R2 Program delivery orders in 2011 and 2010 include the CED Assured Mobility Systems Program, under which we provided technical support services in support of U.S. Army PM Assured Mobility Systems and U.S. Army Tank-automotive and Armaments Command (“TACOM”) and the RCV Modernization Program, under which we performed maintenance work on U.S. Army Route Clearance Vehicles in Kuwait. In July 2010, we received one of several new multiple award omnibus contracts to continue work under the R2 replacement program known as Rapid Response-Third Generation (“R2-3G”) over a five-year period of performance. While the R2-3G contract gives us the opportunity to pursue follow-on work from the original R2 contract and new work, future revenue levels from this contract cannot be determined with certainty and we have not yet recorded any revenue on this contract as of March 31, 2011. There have been delays by the government in issuing task orders to all awardees on the R23G program. The first task order to any awardee was recently issued.

**ELD** - ELD provides full life cycle engineering, logistics, maintenance and refurbishment services to extend and enhance the life of existing equipment. ELD’s largest program supports the U. S. Army Reserve, and ELD also provides support to the U.S. Army. Core competencies include combat and combat service support system conversions, technical research, sustainment and re-engineering, system integration and configuration management.

**FSS** - FSS provides worldwide field maintenance and logistics support services for a wide variety of military vehicles and equipment, including performance of organizational, intermediate and specialized depot-level maintenance. FSS principally supports the U.S. Army and Marine Corps by providing specialized Field Service Representatives (“FSR”) and Field Support Teams (“FST”) in areas of combat operations and austere environments.

**SED** - SED provides comprehensive systems and software engineering, logistics, and prototyping services to DoD. Our services offered through SED principally support U.S. Army, Air Force, and Marine Corps combat and combat support systems. SED’s core competencies include: systems technical support, configuration management and life cycle support for wheeled and tracked vehicles and ground support equipment; obsolescence management, service life extension, and technology insertion programs; and technical documentation and data packages.

**International Group** - Our International Group provides engineering, industrial, logistics and foreign military sales services to the U.S. military and other government agencies.

**GLOBAL** - Through GLOBAL, we provide assistance to the U.S. Navy in executing its Foreign Military Sales (“FMS”) Program for surface ships sold, leased or granted to foreign countries. GLOBAL provides program management, engineering, technical support, logistics services for ship reactivations and transfers and follow-on technical support. The level of revenues and associated profits resulting from fee income generated by this program varies depending on several factors, including the timing of ship transfers and associated support services ordered by foreign governments and political situations and economic conditions of potential customers worldwide. Changes in the level of activity associated with the Navy’s ship transfer program have historically caused quarterly and annual revenue fluctuations.

**FMD** - FMD provides field engineering, logistics, maintenance, and information technology services to the U.S. Navy and Air Force, including fleet-wide ship and aircraft support programs. FMD’s expertise includes ship repair and modernization, ship systems installations, ordnance engineering and logistics, facility operations, war reserve materials management, and IT systems integration. FMD also provides aircraft sustainment and maintenance services to the United States Air Force under the Contract Field Teams (“CFT”) Program.

**Seized Asset Programs –** We also provide management, maintenance, storage and disposal support for seized and forfeited general property programs for the U.S. Department of Treasury (“Treasury”) and the U.S. Department of Justice, Bureau of Alcohol, Tobacco, Firearms and Explosives (“ATF”). Our cost plus incentive fee contract to support the Treasury program ended September 30, 2010 and the Department of Treasury has awarded us interim contract coverage which was recently extended through September 30, 2011 to continue providing services under the program. The interim contract will allow the customer additional time to make an award decision on a successor contract. The Treasury contract services are performed by FMD but will be transitioned to our GLOBAL division if we are awarded the successor contract. The ATF seized asset work was formerly performed under the Treasury contract, but in September 2010, ATF awarded a 10-year contract to our GLOBAL division to provide these services.

**IT, Energy and Management Consulting Group –** The IT, Energy and Management Consulting Group provides technical and consulting services primarily to various DoD and civilian government agencies.

**Energetics** - Energetics provides technical, policy, business, and management support in areas of clean and efficient energy, climate change mitigation, infrastructure protection, measurement technology, and global health. Energetics’ expertise lies in managing collaborative processes to bring together diverse stakeholders in decision making, R&D program planning and evaluation metrics, state-of-the-art technology assessments, technical and economic feasibility analysis, and technical communications. Customers include the U.S. Department of Energy, the U.S. Department of Homeland Security, U.S. Department of Commerce, and other government agencies and commercial clients.

**G&B –** G&B is an established information technology provider to many government agencies, including the Departments of Homeland Security, Interior, Labor, Agriculture, Housing and Urban Development, and Defense; the Social Security Administration; the Pension Benefit Guaranty Corporation; and the National Institutes of Health. G&B’s core expertise lies in enterprise architecture development, information assurance/business continuity, program and portfolio management, network IT services, systems design and integration, quality assurance services and product and process improvement services.

**Akimeka** - We acquired Akimeka in August 2010. Akimeka provides the DoD’s health services and logistics sector with innovative IT solutions that meet high-priority challenges. Akimeka has a technical team skilled at developing information technology (IT) health care solutions within government systems and protocols. Akimeka offers solutions in fields that include medical logistics, medical command and control, e-health, information assurance, and public safety. Most of Akimeka’s customers are in the military health system.

**Infrastructure Group –** This group consists of our ICRC subsidiary, which is engaged principally in providing engineering and transportation infrastructure services and construction management services primarily to Federal Civilian agencies. ICRC’s largest contract is with the U.S. Department of Transportation Maritime Administration for services performed on the Port of Anchorage Intermodal Expansion Project in Alaska (the "PIEP"). Seasonal variability at this location and work constraints imposed by the intermittent presence of endangered species and environmental and other factors result in fluctuations in revenues from the PIEP.

*Concentration of Revenues (in thousands) For the three months ended March 31,*

| Source of Revenue | 2011 Revenues% |  | 2010 Revenues% |  |
| --- | ---: | ---: | ---: | ---: |
| CED Assured Mobility Systems | $28,775 | 19 | $43,387 | 19 |
| GLOBAL FMS | 26,168 | 18 | 33,392 | 15 |
| ELD US Army Reserve | 16,883 | 11 | 14,335 | 6 |
| Treasury/ATF Seized Asset Programs | 10,544 | 7 | 11,299 | 5 |
| PIEP Contract | 3,503 | 2 | 8,007 | 3 |
| RCV Modernization | 480 | - | 20,340 | 9 |
| Other | 64,891 | 43 | 97,416 | 43 |
| Total Revenues | $151,244 | 100 | $228,176 | 100 |

The decline in the “Other” category in the table above is primarily attributable to a decline in our subcontractor work on CED task orders and FMD engineering and technical services task orders.

### Management Outlook

We are transitioning to an increased reliance on work over which we exercise greater operational control, with a broader range of market offerings across a more diversified client base. These planned strategic transitions provide us with an enhanced focus on more profitable work. We laid the groundwork for this transition in 2009 and prior years by increasing our employee workforce in our more profitable markets and identifying and pursuing new markets and clients through our existing businesses and acquisitions. We have built more robust capabilities in our IT offerings and are developing a supply chain management offering.

The acquisition of Akimeka in 2010 represents a key initiative to expand our IT offerings and develop new clients. The DoD health-related information technology services performed by Akimeka provide us with access to an expanding DoD health-related market. The 2010 Akimeka acquisition and the acquisition of G&B in 2008 together have added over 550 professional IT staff members and expanded our market offerings and client base. When combined with the energy and management consulting services performed by Energetics, we have a solid core of high level professional providers of in-demand services that we believe will continue to provide exceptional performance to our clients and contribute to increased revenues and improved profit margins.

The expiration of our R2 contract in January 2011 marked the end of a five- year period in which we generated a significant amount of revenues on this contract. While we performed work on some of the task orders issued under this contract at a reasonable profit margin, the majority of the revenue we recognized was from the pass-through of subcontractor work at what was essentially our cost with very little or no profit. With the discontinuation of R2 subcontractor pass-through in January 2011 we expect to stabilize our revenue base, stay in balance by reducing our indirect costs, and operate at more favorable profit margins.

We also experienced the first decline in our employee workforce in several years during the first quarter of 2011. Our employee count as of March 31, 2011 was 2,698 compared to 2,897 at December 31, 2010. This reduction was primarily attributable to the expiration of the RCV Modernization Program and the completion of several task orders on our Contract Field Teams (“CFT”) Program. Uncertainty related to government funding issues and a temporary evacuation of employees from Egypt due to political unrest contributed to the employee decline to a lesser extent.

We believe the government’s focus will continue to include emphasis on information technology, energy and management consulting, and DoD legacy systems sustainment in the near future. The composition of our workforce and the services we offer are well aligned with near term future government spending priorities. We expect efforts directed toward the growth of our work in these service areas to help us replace declines in our DoD-related subcontractor work and sustain revenue levels.

We also know there are risks and uncertainties related to our business. Government spending priorities may continue to change and there is significant pressure on government budgets. Accordingly, the flow of work to federal contractors may be significantly impacted. We believe that our evolving service offerings are not targeted by any currently planned federal cutbacks. Federal budget reductions will likely be aimed more towards large capital expenditure projects that may present additional opportunities related to our legacy sustainment offerings. The government is also striving for budget efficiencies from better IT infrastructure and information management, another area for which we are well positioned. Nonetheless, Federal budget constraints are affecting the timeliness of awards and the funding of existing contracts in our markets. This may result in increased competition for our market offerings.

In addition to U.S. domestic budget uncertainties, our business is subject to the risks arising from global economic conditions and political factors associated with current and potential customers served through our contracts with the government. An economic slowdown in countries served under the GLOBAL FMS Program, failure by the government of a potential foreign customer to approve and fund acquisition of U.S. Navy ships serviced under this program, or political unrest in a country in which work is performed could potentially affect our revenues. In any one year, a significant amount of our revenues may result from work on the FMS Program for a single foreign government. FMS Program services provided to Egypt have typically accounted for approximately $50 million to $60 million in revenue annually. Due to the shutdown of certain government services and to living and working environment dangers associated with severe domestic and political unrest in Egypt, most of our work efforts performed in Egypt on the FMS Program were suspended in January 2011. As conditions have stabilized, we have begun to transition our workforce back into Egypt. The duration of the disruption of our work in Egypt was temporary and reduced some of our potential revenues for the first quarter of 2011. Due

to the uncertain conditions in Egypt, we cannot predict the potential impact on our 2011 financial operations.

### Bookings and Funded Backlog

Revenues in our industry depend on contract funding (“bookings”), and funded contract backlog is an indicator of potential future revenues. A summary of our bookings and revenues for the three months ended March 31, 2011 and 2010, and funded contract backlog as of March 31, 2011 and 2010 is as follows:

*(in millions)*

|  | 2011 | 2010 |
| --- | ---: | ---: |
| Bookings | $107 | $210 |
| Revenues | $151 | $228 |
| Funded Contract Backlog | $357 | $457 |

### Critical Accounting Policies

Our consolidated financial statements are prepared in accordance with accounting principles generally accepted in the United States, which require us to make estimates and assumptions. There have been no changes in our critical accounting policies since December 31, 2010. Please refer to our Annual Report on Form 10-K for the year ended December 31, 2010 filed with the SEC on March 2, 2011 for a full discussion of our critical accounting policies.

### Revenue by Contract Type

Our revenues by contract type were as follows (in thousands):

|  | Three Months ended March 31, |  |
| --- | ---: | ---: |
| Contract Type | 2011% | 2010% |
| Cost-type | $44,866 30 | $58,864 26 |
| Time and materials | 86,390 57 | 157,651 69 |
| Fixed-price | 19,988 13 | 11,661 5 |
|  | $151,244 100 | $228,176 100 |

A significant portion of our time and materials revenues in 2010 were from CED R2 Program task orders. Due to the expiration of the R2 contract in January 2011, the percentages of work performed by contract type will likely differ in 2011.

### Results of Operations

Our results of operations are as follows (in thousands):

|  | Three Months Ended March 31, 2011 | 2010 | Change% |  |
| --- | ---: | ---: | ---: | ---: |
| Revenues | $151,244 | $228,176 | $(76,932) | (34) |
| Contract costs | 143,514 | 219,227 | (75,713) | (35) |
| Selling, general and administrative expenses | 821 | 298 | 523 | 176 |
| Operating Income | 6,909 | 8,651 | (1,742) | (20) |
| Interest (income) expense | 144 | (5) | 149 | (2,980) |
| Income before income taxes | 6,765 | 8,656 | (1,891) | (22) |
| Provision for income taxes | 2,593 | 3,258 | (665) | (20) |
| Net Income | $4,172 | $5,398 | $(1,226) | (23) |

Our revenues decreased approximately $77 million, or 34%, for the three months ended March 31, 2011, as compared to the same period of 2010. Revenues in our Federal, International, and Infrastructure Groups declined while revenues in our IT, Energy and Management Consulting Group increased.

Our operating income decreased approximately $1.7 million, or 20% for the three months ended March 31, 2011, as compared to the same period of 2010. Operating income in our IT, Energy and Management Consulting Group increased while operating income in each of our other operating groups declined during these periods.

Changes in revenues and income are further discussed in the summaries of our segment results that follow.

Selling, general and administrative expenses consist primarily of costs and expenses that are not chargeable or reimbursable on our operating unit contracts. These expenses increased for the three month period ended March 31, 2011 as compared to the same period of 2010 due to strategic planning costs, corporate consulting costs and professional services fees.

Our effective income tax rates for the three months ended March 31, 2011 and 2010 was 38.3% and 37.6%, respectively.

### Federal Group Results

The results of operations for our Federal Group are as follows (in thousands):

|  | Three Months Ended March 31, 2011 | 2010 | Change% |  |
| --- | ---: | ---: | ---: | ---: |
| Revenues | $66,348 | $129,766 | $(63,418) | (49) |
| Operating Income | $2,544 | $4,784 | $(2,240) | (47) |
| Profit percentage | 3.8% | 3.7% |  |  |

Revenues for our Federal Group decreased approximately $63 million or 49%, for the three-month period ended March 31, 2011 as compared to the same period for the prior year. The decrease in revenues for this segment resulted primarily from a decrease in CED revenues associated with subcontractor work on the RCV Modernization Program and other subcontractor work performed under our expiring R2 contract of approximately $54 million. Revenues associated with our FSS division services also declined approximately $12 million, including a decline of approximately $7 million in labor services performed on the RCV Modernization Program. The declines in revenues in this group were partially offset by revenue increases of approximately $2 million associated with our ELD Division equipment refurbishment services.

Operating income for our Federal Group decreased approximately $2.2 million, or 47% for the three-month period ended March 31, 2011, as compared to the same period for the prior year. The decline in operating income is primarily due to a decline in our FSS division profits of approximately $2.2 million. The decline in FSS division profits resulted from revenue declines associated with the expiring work on the RCV Modernization Program and to declines in other FSS services. We also had a decrease in profits on other R2 Program task orders. These decreases in profits were partially offset by increased profits associated with the ELD revenue increases and by improved profitability on services performed by our SED division.

### International Group Results

The results of operations for our International Group are as follows (in thousands):

|  | Three Months Ended March 31, 2011 | 2010 | Change% |  |
| --- | ---: | ---: | ---: | ---: |
| Revenues | $51,710 | $69,248 | $(17,538) | (25) |
| Operating Income | $1,916 | $2,042 | $(126) | (6) |
| Profit percentage | 3.7% | 2.9% |  |  |

Revenues for our International Group decreased approximately $18 million, or 25%, for the three month period ended March 31, 2011, as compared to the same period for the prior year. The decrease in revenues resulted primarily from a decline of approximately $10 million in revenues associated with FMD pass-through work provided on engineering and technical services task orders under the R2 contract; and from a decline of approximately $7 million in revenues associated with GLOBAL division services, including $4 million associated with work in Egypt.

Operating income for our International Group decreased approximately $126 thousand, or 6%, for the three month period ended March 31, 2011 as compared to the same period for the prior year. Profit margins in this group can vary due to fluctuations in contract activity the timing of contract award fees associated with the GLOBAL FMS Program.

### IT, Energy and Management Consulting Group Results

The results of operations for our IT, Energy and Management Consulting Group are as follows (in thousands):

|  | Three Months Ended March 31, 2011 | 2010 | Change% |  |
| --- | ---: | ---: | ---: | ---: |
| Revenues | $27,363 | $20,292 | $7,071 | 35 |
| Operating Income | $2,344 | $1,984 | $360 | 18 |
| Profit percentage | 8.6% | 9.8% |  |  |

Revenues for our IT, Energy and Management Consulting Group increased approximately $7 million, or 35% for the three month period ended March 31, 2011, as compared to the same period for the prior year. The increase in revenues resulted primarily from the inclusion of revenues of Akimeka, acquired in August 2010, of approximately $7.8 million in our 2011 operating results as compared to not having Akimeka revenues for the same period of 2010. Revenues of Energetics also increased by approximately $900 thousand, while revenues of G&B declined by approximately $1.6 million.

Operating income for this segment increased approximately $360 thousand, or 18%, for the three month period ended March 31, 2010, as compared to the same period for the prior year. The increase is primarily attributable to revenue increases, including revenue increases associated with the inclusion of Akimeka in our operating results. The increases in operating income were partially offset by a decline in total profits and profit margins of G&B.

### Infrastructure Group Results

The results of operations for our Infrastructure Group are as follows (in thousands):

|  | Three Months Ended March 31, 2011 | 2010 | Change% |  |
| --- | ---: | ---: | ---: | ---: |
| Revenues | $5,823 | $8,870 | $(3,047) | (34) |
| Operating Income | $232 | $281 | $(49) | (17) |
| Profit percentage | 4.0% | 3.2% |  |  |

This segment consists of our ICRC subsidiary. Revenues for this group decreased approximately $3 million, or 34%, for the three month period ended March 31, 2011, as compared to the same period for the prior year. Operating income for this segment decreased approximately $49 thousand, or 17%, for the three month period ended March 31, 2011, as compared to the same period for the prior year.

Changes in revenues and operating income for this segment are primarily attributable to revenue and profit activity on the PIEP. Work on this program is performed in Alaska and the level of work performed is subject to seasonal influences and differences in weather patterns during a season as compared to the same period in a prior year. During 2010, the customer funded the cost of certain work we performed on this project, but has not funded any fees normally associated with this work pending resolution of environmental and technical issues impacting the work. Accordingly, we have not recognized fee for most of the work on this project performed in 2010. We are currently in discussions with our customer regarding resolution of the fee issue. If the fee on this work is funded for performance through December 31, 2010, the additional revenue and operating income could be as high as approximately $1.5 million. We have not performed work in 2011 on the task order associated with this fee issue.

### Financial Condition

Our financial condition did not change materially in the first quarter of 2011. Changes to asset and liability accounts were due primarily to our earnings, our level of business activity, contract delivery schedules, subcontractor and vendor payments required to perform our work, and the timing of associated billings to and collections from our customers.

### Liquidity and Capital Resources

### Cash Flows

Cash and cash equivalents decreased approximately $3.5 million during the first quarter of 2011.

We used approximately $3.8 million less cash in operating activities in the first three months of 2011 as compared to the same period of 2010. This resulted from a decrease of approximately $1.2 million in cash provided by net income, an increase of approximately $960 thousand in cash from an increase in depreciation and amortization and other non-cash operating activities, and an increase of approximately $4.1 million in cash due to changes in the levels of working capital components. Of these working capital components, our largest asset is our accounts receivable and our largest liability is our accounts payable. A significant portion of our accounts receivable and accounts payable result from the use of subcontractors to perform work on our contracts and from the purchase of materials to fulfill our contract requirements. Our levels of accounts receivable and accounts payable may fluctuate significantly depending on the timing of the government services ordered, government funding delays, the timing of billings received from subcontractors and materials vendors, and the timing of payments received from government customers in payment of these services. Such timing differences may cause significant increases and decreases in our accounts receivable and accounts payable in short time periods.

We used approximately $292 thousand less cash in investing activities in the first three months of 2011 as compared to the same period of 2010. Investing activities in 2011 consisted of purchases of property and equipment and the earn-out payment of approximately $270 thousand associated with the acquisition of ICRC when certain financial performance targets were achieved.

We used approximately $1.7 million more cash in financing activities in the first three months of 2011 as compared to the same period of 2010. This difference was primarily the result of net repayments on our bank loan in 2011 as compared to no net change in our borrowing levels in 2010.

We paid quarterly cash dividends totaling $0.06 per share during the first quarter of 2011. Pursuant to our bank loan agreement, our payment of cash dividends is subject to annual rate restrictions. We have paid cash dividends each year since 1973.

### Liquidity

Our internal sources of liquidity are primarily from operating activities, specifically from changes in the level of revenues and associated accounts receivable and accounts payable, and from profitability. Significant increases or decreases in revenues and accounts receivable and accounts payable can cause significant increases or decreases in internal liquidity. Our accounts receivable and accounts payable levels can be affected by changes in the level of the work we perform and by the timing of large materials purchases and subcontractor efforts used in our contracts.

We also purchase property and equipment and invest in expansion, improvement, and maintenance of our operational and administrative facilities. From time to time, we may also invest in the acquisition of other companies. Our acquisitions of G&B in 2008 and Akimeka in 2010 required a significant use of our cash.

Our external financing consists of a loan agreement with a group of banks that provides us several types of financing. The loan agreement consists of a term loan, revolving loans, and letters of credit and expires in August 2013.

The term loan has monthly installments payable on a straight-line amortization schedule, with final payment due in August 2013. The amount of the term loan outstanding as of March 31, 2011 is approximately $16.1 million. We pay interest on the term loan borrowings at a prime-based rate or an optional LIBOR-based rate.

The maximum amount of credit available to us from the banking group for revolving loans and letters of credit as of March 31, 2011 was $50 million and under the loan agreement we may elect to increase this maximum availability up to $75 million. This amount is subject to certain conditions, including a borrowing formula based on our billed receivables. We may borrow against the revolving loan at any time and can repay the borrowings at any time without premium or penalty. We pay a commitment fee, interest on any revolving loan borrowings at a prime-based rate or an optional LIBOR-based rate, and fees on any letters of credit that are issued.

We had approximately $6.9 million of letters of credit outstanding and no revolving loan amounts outstanding as of March 31, 2011. During the first quarter of 2011, the highest outstanding revolving loan amount was $17.3 million and the lowest was $0. The timing of certain payments made and collections received associated with our subcontractor and materials requirements and other operating expenses can cause temporary peaks in our outstanding revolving loan amounts.

The loan agreement contains collateral requirements that secure our assets, restrictive covenants, a limit on annual dividends, and other affirmative and negative covenants. Restrictive covenants include a maximum Leverage Ratio (Total Funded Debt/EBITDA), a minimum Fixed Charge Coverage Ratio, and a minimum Asset Coverage Ratio that we were in compliance with at March 31, 2011.

|  |  |  |
| --- | --- | --- |
|  | Maximum Ratio | Actual Ratio |
| Leverage Ratio | 3.00 to 1 | 0.71 to 1 |

|  |  |  |
| --- | --- | --- |
|  | Minimum Ratio | Actual Ratio |
| Fixed Charge Coverage Ratio | 1.25 to 1 | 2.41 to 1 |
|  | Minimum Ratio | Actual Ratio |
| Asset Coverage Ratio | 1.5 to 1 | 4.13 to 1 |

We currently do not use public debt security financing.

### Inflation and Pricing

Most of our contracts provide for estimates of future labor costs to be escalated for any option periods, while the non-labor costs in our contracts are normally considered reimbursable at cost. Our property and equipment consists principally of computer systems equipment, furniture and fixtures, shop equipment, and land and improvements. We do not expect the overall impact of inflation on replacement costs of our property and equipment to be material to our future results of operations or financial condition.

### Disclosures About Market Risk

### Interest Rates

Our bank loans provide available borrowing to us at variable interest rates. The amounts we have historically borrowed have not been large with respect to our cash flows and we have been able to pay down any bank loan borrowings in a relatively short time frame. Because of this, any adverse movement in interest rates in past periods have not had a material impact on earnings or cash flows. Accordingly, future interest rate changes could potentially have a material impact on future earnings and cash flows. We intend to mitigate the risks associated with interest rate movements by employing interest rate hedges on a significant portion of the outstanding borrowings.

## Market risk

As filed, 133 characters.

See “Disclosures About Market Risk” in Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations.

## Controls and procedures

As filed, 1,295 characters.

As of the end of the period covered by this report, based on management's evaluation, with the participation of our Chief Executive Officer and Chief Financial Officer, of the effectiveness of the disclosure controls and procedures (as defined in Rules 13a-15(e) or 15d - 15(e) under the Securities Exchange Act of 1934, as amended) our Chief Executive Officer and Chief Financial Officer have concluded that our disclosure controls and procedures are effective in ensuring that information required to be disclosed by us in reports filed or submitted under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in the Securities and Exchange Commission's rules and forms, and that information required to be disclosed by us in the reports that we file or submit under the Exchange Act is accumulated and communicated to our management, including our principal executive and principal financial officers, or persons performing similar functions, as appropriate to allow timely decisions regarding required disclosure.

There was no change in our internal control over financial reporting during our first quarter of fiscal 2010 that has materially affected, or is reasonably likely to materially affect, our internal control over financial reporting.

Filed Apr 29, 2011.
Source: SEC EDGAR, the filing index for accession 0000102752-11-000024. Last ingested by Listed: Nov 5, 2026, 19:54 ET. No prices; not investment advice.