## Figures reported in this filing

Standardized XBRL line items for the period ended 2012-09-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Operating income | 3 months, 2012-07-01 to 2012-09-30 | $280.6m | us-gaap:OperatingIncomeLoss |
| Operating income | 9 months, 2012-01-01 to 2012-09-30 | $798.9m | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2012-07-01 to 2012-09-30 | $60.9m | us-gaap:InterestExpense |
| Interest expense | 9 months, 2012-01-01 to 2012-09-30 | $181.3m | us-gaap:InterestExpense |
| Income tax | 3 months, 2012-07-01 to 2012-09-30 | $89.7m | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 9 months, 2012-01-01 to 2012-09-30 | $252.6m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2012-07-01 to 2012-09-30 | $156.1m | us-gaap:NetIncomeLoss |
| Net income | 9 months, 2012-01-01 to 2012-09-30 | $447.5m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2012-07-01 to 2012-09-30 | $0.67 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 9 months, 2012-01-01 to 2012-09-30 | $1.92 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2012-07-01 to 2012-09-30 | $0.68 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 9 months, 2012-01-01 to 2012-09-30 | $1.94 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2012-07-01 to 2012-09-30 | 232,900,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 9 months, 2012-01-01 to 2012-09-30 | 233,100,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 9 months, 2012-01-01 to 2012-09-30 | $992.4m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Dividends paid | 9 months, 2012-01-01 to 2012-09-30 | $207.4m | us-gaap:PaymentsOfDividendsCommonStock |
| Share repurchases | 9 months, 2012-01-01 to 2012-09-30 | $105.0m | us-gaap:PaymentsForRepurchaseOfCommonStock |
| Cash and equivalents | at 2012-09-30 | $13.0m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2012-09-30 | $1.08bn | us-gaap:AssetsCurrent |
| Total assets | at 2012-09-30 | $13.83bn | us-gaap:Assets |
| Current liabilities | at 2012-09-30 | $1.39bn | us-gaap:LiabilitiesCurrent |
| Long-term debt | at 2012-09-30 | $4.24bn | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2012-09-30 | $381.1m | us-gaap:LongTermDebtCurrent |
| Short-term borrowings | at 2012-09-30 | $453.2m | us-gaap:CommercialPaper |
| Shares outstanding | at 2012-09-30 | 230,070,094 shares | dei:EntityCommonStockSharesOutstanding |

## Management's discussion and analysis

As filed, 56,582 characters.

### AND RESULTS OF OPERATIONS

### RESULTS OF OPERATIONS -- THREE MONTHS ENDED SEPTEMBER 30, 2012

### CONSOLIDATED EARNINGS

The following table compares our operating income by business segment and our net income during the third quarter of 2012 with the third quarter of 2011, including favorable (better (B)) or unfavorable (worse (W)) variances:

|  | Three Months Ended September 30 2012 (Millions of Dollars) | B (W) | 2011 |
| --- | ---: | ---: | ---: |
| Utility Energy Segment | $191.0 | $55.4 | $135.6 |
| Non-Utility Energy Segment | 91.5 | 1.7 | 89.8 |
| Corporate and Other | (1.9) | (0.8) | (1.1) |
| Total Operating Income | 280.6 | 56.3 | 224.3 |
| Equity in Earnings of Transmission Affiliate | 17.1 | 1.4 | 15.7 |
| Other Income, net | 9.0 | (7.2) | 16.2 |
| Interest Expense, net | 60.9 | (4.1) | 56.8 |
| Income from Continuing Operations Before Income Taxes | 245.8 | 46.4 | 199.4 |
| Income Tax Expense | 89.7 | (20.1) | 69.6 |
| Income from Continuing Operations | $156.1 | $26.3 | $129.8 |
| Diluted Earnings Per Share from Continuing Operations | $0.67 | $0.12 | $0.55 |

### UTILITY ENERGY SEGMENT CONTRIBUTION TO OPERATING INCOME

Our utility energy segment contributed $191.0 million of operating income during the third quarter of 2012, an increase of $55.4 million, or 40.9%, compared with the third quarter of 2011. The following table summarizes the operating income of this segment between the comparative quarters:

| Utility Energy Segment Operating Revenues | Three Months Ended September 30 2012 (Millions of Dollars) | B (W) | 2011 |
| --- | ---: | ---: | ---: |
| Electric | $901.2 | $1.0 | $900.2 |
| Gas | 116.7 | (13.6) | 130.3 |
| Other | 5.4 | (0.8) | 6.2 |
| Total Operating Revenues | 1,023.3 | (13.4) | 1,036.7 |
| Operating Expenses |  |  |  |
| Fuel and Purchased Power | 337.7 | 14.4 | 352.1 |
| Cost of Gas Sold | 55.5 | 13.7 | 69.2 |
| Other Operation and Maintenance | 334.1 | 52.9 | 387.0 |
| Depreciation and Amortization | 74.7 | (10.6) | 64.1 |
| Property and Revenue Taxes | 30.3 | (1.6) | 28.7 |
| Total Operating Expenses | 832.3 | 68.8 | 901.1 |
| Operating Income | $191.0 | $55.4 | $135.6 |

*September 2012* 24 *Wisconsin Energy Corporation*

### Electric Utility Revenues and Sales

The following table compares electric utility operating revenues and MWh sales by customer class during the third quarter of 2012 with the third quarter of 2011:

| Electric Utility Operations Customer Class | Three Months Ended September 30 Electric Revenues 2012 (Millions of Dollars) | B (W) | 2011 | MWh Sales 2012 (Thousands) | B (W) | 2011 |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Residential | $340.2 | $0.4 | $339.8 | 2,422.5 | (28.6) | 2,451.1 |
| Small Commercial/Industrial | 284.2 | 5.2 | 279.0 | 2,456.3 | 16.6 | 2,439.7 |
| Large Commercial/Industrial | 200.7 | (8.9) | 209.6 | 2,486.1 | (225.5) | 2,711.6 |
| Other - Retail | 5.4 | 0.1 | 5.3 | 34.6 | (1.1) | 35.7 |
| Total Retail | 830.5 | (3.2) | 833.7 | 7,399.5 | (238.6) | 7,638.1 |
| Wholesale - Other | 40.0 | 1.5 | 38.5 | 411.7 | (76.2) | 487.9 |
| Resale - Utilities | 17.8 | (3.1) | 20.9 | 596.3 | 70.9 | 525.4 |
| Other Operating Revenues | 12.9 | 5.8 | 7.1 | — | — | — |
| Total | $901.2 | $1.0 | $900.2 | 8,407.5 | (243.9) | 8,651.4 |
| Weather -- Degree Days (a) |  |  |  |  |  |  |
| Heating (126 Normal) |  |  |  | 138 | (18) | 156 |
| Cooling (526 Normal) |  |  |  | 735 | 62 | 673 |
| (a) As measured at Mitchell International Airport in Milwaukee, Wisconsin. Normal degree days are based upon a 20-year |  |  |  |  |  |  |
| moving average. |  |  |  |  |  |  |

Our electric utility operating revenues increased by $1.0 million, or 0.1%, when compared to the third quarter of 2011.

We estimate favorable summer weather increased revenues by approximately $31 million in our Residential and Small Commercial/Industrial customer classes in 2012 compared to normal weather conditions. By comparison, we estimate that favorable weather in 2011 increased revenues for these customer classes by approximately $28 million compared to normal weather conditions.

Sales to the Large Commercial/Industrial customer class decreased by 8.3% in 2012 compared to 2011. Large Commercial/Industrial revenues decreased by approximately $8.9 million compared to 2011. We estimate that our revenues were reduced by approximately $15 million because of the planned outage at an iron ore mine of our largest customer, and the conversion to self-generation of two other large customers. If sales to the mines and the two customers that added self-generation are excluded, our MWh sales to Large Commercial/Industrial customers increased by 0.6%.

In addition, our retail revenues increased by approximately $13 million in 2012 because of rate increases in Michigan and favorable fuel recoveries in Wisconsin. Other Operating Revenues increased by approximately $5.8 million driven by the $8 million of amortization related to the DOE settlement used to offset an increase in fuel costs authorized by the PSCW. For additional information on the 2012 Michigan rate case and the DOE settlement, see Factors Affecting Results, Liquidity and Capital Resources -- Utility Rates and Regulatory Matters and -- Nuclear Operations, respectively.

### Fuel and Purchased Power

Our fuel and purchased power costs decreased by $14.4 million, or 4.1%, when compared to the third quarter of 2011. This decrease was primarily caused by a 2.8% decrease in total MWh sales and a reduction in our average cost of fuel and purchased power because of lower natural gas prices.

*September 2012* 25 *Wisconsin Energy Corporation*

### Gas Utility Revenues, Gross Margin and Therm Deliveries

A comparison follows of gas utility operating revenues, gross margin and gas deliveries during the third quarter of 2012 with the third quarter of 2011. We believe gross margin is a better performance indicator than revenues because changes in the cost of gas sold flow through to revenue under gas cost recovery mechanisms. Between the comparative periods, total gas operating revenues decreased by $13.6 million, or 10.4%, and cost of gas sold decreased by $13.7 million, or 19.8%.

|  | Three Months Ended September 30 2012 (Millions of Dollars) | B (W) | 2011 |
| --- | ---: | ---: | ---: |
| Gas Operating Revenues | $116.7 | $(13.6) | $130.3 |
| Cost of Gas Sold | 55.5 | 13.7 | 69.2 |
| Gross Margin | $61.2 | $0.1 | $61.1 |

The following table compares gas utility gross margin and natural gas therm deliveries by customer class during the third quarter of 2012 with the third quarter of 2011:

| Gas Utility Operations Customer Class | Three Months Ended September 30 Gross Margin 2012 (Millions of Dollars) | B (W) | 2011 | Therm Deliveries 2012 (Millions) | B (W) | 2011 |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Residential | $37.9 | $(0.3) | $38.2 | 46.2 | (2.1) | 48.3 |
| Commercial/Industrial | 10.2 | (0.1) | 10.3 | 33.1 | (0.2) | 33.3 |
| Interruptible | 0.3 | — | 0.3 | 2.3 | — | 2.3 |
| Total Retail | 48.4 | (0.4) | 48.8 | 81.6 | (2.3) | 83.9 |
| Transported Gas | 11.8 | 0.7 | 11.1 | 269.7 | 69.4 | 200.3 |
| Other | 1.0 | (0.2) | 1.2 | — | — | — |
| Total | $61.2 | $0.1 | $61.1 | 351.3 | 67.1 | 284.2 |
| Weather -- Degree Days (a) |  |  |  |  |  |  |
| Heating (126 Normal) |  |  |  | 138 | (18) | 156 |
| (a) As measured at Mitchell International Airport in Milwaukee, Wisconsin. Normal degree days are based upon a 20-year |  |  |  |  |  |  |
| moving average. |  |  |  |  |  |  |

Our gas margin is seasonal and is primarily driven by the heating needs of our customers. The third quarter gas margin is historically the lowest of the year because of the lack of heating load. Our gas margin increased by $0.1 million, or approximately 0.2%, when compared to the third quarter of 2011.

### Other Operation and Maintenance Expense

Our other operation and maintenance expense decreased by $52.9 million, or approximately 13.7%, when compared to the third quarter of 2011. This decrease, which we expect to continue through the remainder of the year, is primarily due to the one year suspension of $148 million of amortization expense on certain regulatory assets as authorized under our 2012 Wisconsin Rate Case. For additional information on the 2012 rate case, see Factors Affecting Results, Liquidity and Capital Resources -- Utility Rates and Regulatory Matters.

### Depreciation and Amortization Expense

Our depreciation and amortization expense increased by $10.6 million, or approximately 16.5%, when compared to the third quarter of 2011 primarily because of an overall increase in utility plant in service. The Glacier Hills Wind Park went into service in December 2011. In addition, the emission control equipment for units 5 and 6 of the Oak

*September 2012* 26 *Wisconsin Energy Corporation*

Creek Air Quality Control System (AQCS) project went into service in March 2012, and for units 7 and 8 in September 2012. For additional information, see Factors Affecting Results, Liquidity and Capital Resources -- Utility Rates and Regulatory Matters -- Oak Creek Air Quality Control System.

### NON-UTILITY ENERGY SEGMENT CONTRIBUTION TO OPERATING INCOME

Our non-utility energy segment consists primarily of our PTF units (Port Washington Generating Station Unit 1 (PWGS 1), Port Washington Generating Station Unit 2 (PWGS 2), Oak Creek expansion Unit 1 (OC 1) and OC 2).

This segment reflects the lease revenues on the new units as well as the depreciation expense. Operating and maintenance costs associated with the plants are the responsibility of Wisconsin Electric and are recorded in the utility segment.

|  | Three Months Ended September 30 2012 (Millions of Dollars) | B (W) | 2011 |
| --- | ---: | ---: | ---: |
| Operating Revenues | $112.6 | $(0.4) | $113.0 |
| Operation and Maintenance Expense | 4.3 | 0.6 | 4.9 |
| Depreciation Expense | 16.8 | 1.5 | 18.3 |
| Operating Income | $91.5 | $1.7 | $89.8 |

### CONSOLIDATED OTHER INCOME, NET

|  | Three Months Ended September 30 2012 (Millions of Dollars) | B (W) | 2011 |
| --- | ---: | ---: | ---: |
| AFUDC - Equity | $8.9 | $(7.1) | $16.0 |
| Other, net | 0.1 | (0.1) | 0.2 |
| Other Income, net | $9.0 | $(7.2) | $16.2 |

Other income, net decreased by $7.2 million, or approximately 44.4%, when compared to the third quarter of 2011. The decrease in AFUDC - Equity is primarily related to the Glacier Hills Wind Park, which went into service in December 2011, as well as the Oak Creek AQCS project which emission control equipment went into service in March 2012 for units 5 and 6 and September 2012 for units 7 and 8. For additional information, see Factors Affecting Results, Liquidity and Capital Resources -- Utility Rates and Regulatory Matters -- Oak Creek Air Quality Control System.

### CONSOLIDATED INTEREST EXPENSE, NET

|  | Three Months Ended September 30 2012 (Millions of Dollars) | B (W) | 2011 |
| --- | ---: | ---: | ---: |
| Gross Interest Costs | $65.0 | $(1.3) | $63.7 |
| Less: Capitalized Interest | 4.1 | (2.8) | 6.9 |
| Interest Expense, net | $60.9 | $(4.1) | $56.8 |

Our gross interest costs increased by $1.3 million, or approximately 2.0%, when compared to the third quarter of 2011 primarily because of the issuance of $300 million of long-term debt by Wisconsin Electric in September 2011.

*September 2012* 27 *Wisconsin Energy Corporation*

Our capitalized interest decreased by $2.8 million primarily because of lower construction work in progress. As a result, our net interest expense increased by $4.1 million, or 7.2%, as compared to the third quarter of 2011.

### CONSOLIDATED INCOME TAX EXPENSE

For the third quarter of 2012, our effective tax rate applicable to continuing operations was 36.5% compared to 34.9% for the third quarter of 2011, primarily due to a decrease in the projected 2012 annual tax benefits associated with AFUDC - Equity. For additional information, see Note H -- Income Taxes in our 2011 Annual Report on Form 10-K.

### RESULTS OF OPERATIONS -- NINE MONTHS ENDED SEPTEMBER 30, 2012

### CONSOLIDATED EARNINGS

The following table compares our operating income by business segment and our net income during the first nine months of 2012 with the first nine months of 2011, including favorable (better (B)) or unfavorable (worse (W)) variances:

|  | Nine Months Ended September 30 2012 (Millions of Dollars) | B (W) | 2011 |
| --- | ---: | ---: | ---: |
| Utility Energy Segment | $533.2 | $96.5 | $436.7 |
| Non-Utility Energy Segment | 270.2 | 8.5 | 261.7 |
| Corporate and Other | (4.5) | (0.4) | (4.1) |
| Total Operating Income | 798.9 | 104.6 | 694.3 |
| Equity in Earnings of Transmission Affiliate | 48.9 | 2.5 | 46.4 |
| Other Income, net | 33.6 | (9.5) | 43.1 |
| Interest Expense, net | 181.3 | (3.7) | 177.6 |
| Income from Continuing Operations Before Income Taxes | 700.1 | 93.9 | 606.2 |
| Income Tax Expense | 252.6 | (45.1) | 207.5 |
| Income from Continuing Operations | $447.5 | $48.8 | $398.7 |
| Diluted Earnings Per Share from Continuing Operations | $1.92 | $0.23 | $1.69 |
| Diluted Earnings Per Share from Discontinued Operations | $— | $(0.05) | $0.05 |

### UTILITY ENERGY SEGMENT CONTRIBUTION TO OPERATING INCOME

Our utility energy segment contributed $533.2 million of operating income during the first nine months of 2012, an increase of $96.5 million, or 22.1%, compared with the first nine months of 2011. The following table summarizes the operating income of this segment between the comparative periods:

*September 2012* 28 *Wisconsin Energy Corporation*

#### Form 10-Q

| Utility Energy Segment Operating Revenues | Nine Months Ended September 30 2012 (Millions of Dollars) | B (W) | 2011 |
| --- | ---: | ---: | ---: |
| Electric | $2,451.1 | $11.7 | $2,439.4 |
| Gas | 656.3 | (206.5) | 862.8 |
| Other | 24.8 | (4.1) | 28.9 |
| Total Operating Revenues | 3,132.2 | (198.9) | 3,331.1 |
| Operating Expenses |  |  |  |
| Fuel and Purchased Power | 852.8 | 55.3 | 908.1 |
| Cost of Gas Sold | 368.0 | 165.4 | 533.4 |
| Other Operation and Maintenance | 1,069.0 | 107.7 | 1,176.7 |
| Depreciation and Amortization | 218.8 | (27.4) | 191.4 |
| Property and Revenue Taxes | 90.4 | (5.6) | 84.8 |
| Total Operating Expenses | 2,599.0 | 295.4 | 2,894.4 |
| Operating Income | $533.2 | $96.5 | $436.7 |

### Electric Utility Revenues and Sales

The following table compares electric utility operating revenues and MWh sales by customer class during the first nine months of 2012 with the first nine months of 2011:

| Electric Utility Operations Customer Class | Nine Months Ended September 30 Electric Revenues 2012 (Millions of Dollars) | B (W) | 2011 | MWh Sales 2012 (Thousands) | B (W) | 2011 |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Residential | $891.7 | $9.1 | $882.6 | 6,354.0 | 37.3 | 6,316.7 |
| Small Commercial/Industrial | 779.1 | 13.0 | 766.1 | 6,777.3 | 73.7 | 6,703.6 |
| Large Commercial/Industrial | 569.0 | (12.6) | 581.6 | 7,339.7 | (247.7) | 7,587.4 |
| Other - Retail | 16.6 | — | 16.6 | 111.2 | 0.6 | 110.6 |
| Total Retail | 2,256.4 | 9.5 | 2,246.9 | 20,582.2 | (136.1) | 20,718.3 |
| Wholesale - Other | 112.3 | (2.1) | 114.4 | 1,113.1 | (379.7) | 1,492.8 |
| Resale - Utilities | 43.2 | (10.4) | 53.6 | 1,392.1 | (139.5) | 1,531.6 |
| Other Operating Revenues | 39.2 | 14.7 | 24.5 | — | — | — |
| Total | $2,451.1 | $11.7 | $2,439.4 | 23,087.4 | (655.3) | 23,742.7 |
| Weather -- Degree Days (a) |  |  |  |  |  |  |
| Heating (4,385 Normal) |  |  |  | 3,513 | (1,124) | 4,637 |
| Cooling (686 Normal) |  |  |  | 1,041 | 255 | 786 |
| (a) As measured at Mitchell International Airport in Milwaukee, Wisconsin. Normal degree days are based upon a 20-year |  |  |  |  |  |  |
| moving average. |  |  |  |  |  |  |

Our electric utility operating revenues increased by $11.7 million, or 0.5%, when compared to the first nine months of 2011.

We estimate favorable weather increased revenues by approximately $39 million in our Residential and Small Commercial/Industrial customer classes in 2012 compared to normal weather conditions. By comparison, we estimate that favorable weather in 2011 increased revenues for these customer classes by approximately $23 million compared to normal weather conditions.

Sales to the Large Commercial/Industrial customer class decreased by 3.3% in 2012 compared to 2011. Large Commercial/Industrial revenues decreased by approximately $12.6 million compared to 2011. We estimate that our

*September 2012* 29 *Wisconsin Energy Corporation* revenues were reduced by approximately $23 million because of the planned outage at an iron ore mine of our largest customer, and the conversion to self-generation of two other large customers. If sales to the mines and the two customers that added self-generation are excluded, our MWh sales to Large Commercial/Industrial customers increased by 1.7%.

In addition, our retail revenues increased by approximately $9 million in 2012 because of rate increases in Michigan and favorable fuel recoveries in Wisconsin. Other Operating Revenues increased by approximately $14.7 million driven by the $22 million of amortization related to the DOE settlement used to offset an increase in fuel costs authorized by the PSCW.

### Fuel and Purchased Power

Our fuel and purchased power costs decreased by $55.3 million, or 6.1%, when compared to the first nine months of 2011. This decrease was primarily caused by a 2.8% decrease in total MWh sales and a reduction in our average cost of fuel and purchased power because of lower natural gas prices.

### Gas Utility Revenues, Gross Margin and Therm Deliveries

A comparison follows of gas utility operating revenues, gross margin and gas deliveries during the first nine months of 2012 with the first nine months of 2011. We believe gross margin is a better performance indicator than revenues because changes in the cost of gas sold flow through to revenue under gas cost recovery mechanisms. Between the comparative periods, total gas operating revenues decreased by $206.5 million, or 23.9%, and cost of gas sold decreased by $165.4 million, or 31.0%, due to the significantly warmer weather, which resulted in lower therm deliveries, and a decline in the commodity cost of natural gas.

|  | Nine Months Ended September 30 2012 (Millions of Dollars) | B (W) | 2011 |
| --- | ---: | ---: | ---: |
| Gas Operating Revenues | $656.3 | $(206.5) | $862.8 |
| Cost of Gas Sold | 368.0 | 165.4 | 533.4 |
| Gross Margin | $288.3 | $(41.1) | $329.4 |

The following table compares gas utility gross margin and natural gas therm deliveries by customer class during the first nine months of 2012 with the first nine months of 2011:

| Gas Utility Operations Customer Class | Nine Months Ended September 30 Gross Margin 2012 (Millions of Dollars) | B (W) | 2011 | Therm Deliveries 2012 (Millions) | B (W) | 2011 |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Residential | $184.5 | $(26.5) | $211.0 | 436.9 | (119.1) | 556.0 |
| Commercial/Industrial | 59.4 | (13.4) | 72.8 | 254.2 | (73.0) | 327.2 |
| Interruptible | 1.2 | (0.2) | 1.4 | 9.9 | (1.9) | 11.8 |
| Total Retail | 245.1 | (40.1) | 285.2 | 701.0 | (194.0) | 895.0 |
| Transported Gas | 38.6 | (0.3) | 38.9 | 876.9 | 209.5 | 667.4 |
| Other | 4.6 | (0.7) | 5.3 | — | — | — |
| Total | $288.3 | $(41.1) | $329.4 | 1,577.9 | 15.5 | 1,562.4 |
| Weather -- Degree Days (a) |  |  |  |  |  |  |
| Heating (4,385 Normal) |  |  |  | 3,513 | (1,124) | 4,637 |
| (a) As measured at Mitchell International Airport in Milwaukee, Wisconsin. Normal degree days are based upon a 20-year |  |  |  |  |  |  |
| moving average. |  |  |  |  |  |  |

*September 2012* 30 *Wisconsin Energy Corporation*

Our gas margin decreased by $41.1 million, or approximately 12.5%, when compared to the first nine months of 2011. This decrease primarily relates to a decrease in sales volumes as a result of warmer weather during the first nine months of 2012 that decreased heating loads. As measured by heating degree days, the first nine months of 2012 were 24.2% warmer than the same period in 2011 and 19.9% warmer than normal. Transported gas volumes for the first nine months of 2012 increased by 31.4% as compared to the same period in 2011. Virtually all of the volume increase related to gas used in electric generation, which has a small impact on margin. This margin increase was more than offset by a reduction in transportation volumes delivered to higher margin classes that are more weather sensitive than our large transport customers.

### Other Operation and Maintenance Expense

Our other operation and maintenance expense decreased by $107.7 million, or approximately 9.2%, when compared to the first nine months of 2011, primarily due to the one year suspension of $148 million of amortization expense on certain regulatory assets as authorized under our 2012 Wisconsin Rate Case.

### Depreciation and Amortization Expense

Our depreciation and amortization expense increased by $27.4 million, or approximately 14.3%, when compared to the first nine months of 2011 primarily because of an overall increase in utility plant in service. The Glacier Hills Wind Park went into service in December 2011. In addition, the emission control equipment for units 5 and 6 of the Oak Creek AQCS project went into service in March 2012, and for units 7 and 8 in September 2012.

### NON-UTILITY ENERGY SEGMENT CONTRIBUTION TO OPERATING INCOME

The table below reflects nine months of earnings in 2012 and 2011 for PWGS 1, PWGS 2, OC 1 and the common facilities for the Oak Creek expansion. It also reflects nine months of earnings in 2012 and approximately eight and a half months of earnings in 2011 for OC 2. This segment reflects the lease revenues on the new units as well as the depreciation expense. The operating and maintenance costs associated with the plants are the responsibility of Wisconsin Electric and are recorded in the utility segment.

|  | Nine Months Ended September 30 2012 (Millions of Dollars) | B (W) | 2011 |
| --- | ---: | ---: | ---: |
| Operating Revenues | $332.2 | $4.7 | $327.5 |
| Operation and Maintenance Expense | 11.7 | (0.2) | 11.5 |
| Depreciation Expense | 50.3 | 4.0 | 54.3 |
| Operating Income (Loss) | $270.2 | $8.5 | $261.7 |

### CONSOLIDATED OTHER INCOME, NET

|  | Nine Months Ended September 30 2012 (Millions of Dollars) | B (W) | 2011 |
| --- | ---: | ---: | ---: |
| AFUDC - Equity | $31.7 | $(9.9) | $41.6 |
| Other, net | 1.9 | 0.4 | 1.5 |
| Other Income, net | $33.6 | $(9.5) | $43.1 |

Other income, net decreased by $9.5 million, or approximately 22.0%, when compared to the first nine months of 2011. The decrease in AFUDC - Equity is primarily related to the Glacier Hills Wind Park, which went into service in December 2011, as well as the Oak Creek AQCS project which emission control equipment went into service in March 2012 for units 5 and 6 and September 2012 for units 7 and 8.

*September 2012* 31 *Wisconsin Energy Corporation*

### CONSOLIDATED INTEREST EXPENSE, NET

|  | Nine Months Ended September 30 2012 (Millions of Dollars) | B (W) | 2011 |
| --- | ---: | ---: | ---: |
| Gross Interest Costs | $195.4 | $1.3 | $196.7 |
| Less: Capitalized Interest | 14.1 | (5.0) | 19.1 |
| Interest Expense, net | $181.3 | $(3.7) | $177.6 |

Our gross interest costs decreased by $1.3 million, or approximately 0.7%, when compared to the first nine months of 2011 primarily because we retired $450 million of long-term debt in April 2011. This decrease was partially offset by increased interest costs associated with the issuance of $300 million of long-term debt by Wisconsin Electric in September 2011. Our capitalized interest decreased by $5.0 million primarily because of lower construction work in progress. As a result, our net interest expense increased by $3.7 million, or 2.1%, as compared to the first nine months of 2011.

### CONSOLIDATED INCOME TAX EXPENSE

For the first nine months of 2012, our effective tax rate applicable to continuing operations was 36.1% compared to 34.2% for the first nine months of 2011, primarily due to a decrease in the projected 2012 annual tax benefits associated with AFUDC - Equity. For additional information, see Note H -- Income Taxes in our 2011 Annual Report on Form 10-K. We expect our 2012 annual effective tax rate to be between 35.5% and 36.5%.

### DISCONTINUED OPERATIONS

During 2011, we reached a favorable resolution of uncertain state and federal tax positions associated with our previously discontinued manufacturing business.

### LIQUIDITY AND CAPITAL RESOURCES

### CASH FLOWS

The following summarizes our cash flows from continuing operations during the nine months ended September 30:

| Cash Provided by (Used in) | 2012 (Millions of Dollars) | 2011 |
| --- | ---: | ---: |
| Operating Activities | $992.4 | $827.6 |
| Investing Activities | $(491.4) | $(650.3) |
| Financing Activities | $(502.1) | $(186.7) |

### Operating Activities

Cash provided by operating activities increased by $164.8 million during the first nine months of 2012 as compared to the same period in 2011. Increases in cash provided by operating activities are attributed to higher net income, higher depreciation expense and lower contributions to our benefit plans. In September 2012, we contributed $100.0 million to our qualified benefits plans, compared to $257.4 million during the first nine months of 2011. In addition, our non-cash charges related to the amortization of certain regulatory assets and liabilities was $111.0 million lower in the first nine months of 2012 as compared to the first nine months in 2011 because the PSCW allowed us to suspend these amortizations in 2012.

*September 2012* 32 *Wisconsin Energy Corporation*

### Investing Activities

Cash used in investing activities declined by $158.9 million during the first nine months of 2012 as compared to the same period in 2011. Our capital expenditures decreased by $134.7 million during the first nine months of 2012 as compared to the same period in 2011, primarily because of decreased spending on the Oak Creek AQCS project. During the first nine months of 2011, we received proceeds from asset sales totaling $38.5 million, which primarily relates to the sale of our interest in Edgewater Generating Unit 5, as compared to proceeds of $3.0 million during the first nine months of 2012. Finally, changes in restricted cash improved our cash from investing activities by $73.2 million. In 2011, we received $45.5 million in proceeds from the settlement with the DOE. The proceeds were treated as restricted cash, which was recorded as cash used in investing activities. In 2012, we released $36.0 million of the proceeds through bill credits and the reimbursement of costs.

### Financing Activities

Cash used in financing activities increased by $315.4 million during the first nine months of 2012 as compared to the same period in 2011. During the first nine months of 2011, we issued $720.0 million of long-term debt, of which $420 million related to the commercial operation of OC 2 and $300 million was issued by Wisconsin Electric. During the same period, we retired $450 million of long-term debt that matured. We did not issue any long-term debt during the first nine months of 2012. In January 2012, our Board of Directors approved a 15.4% increase in the quarterly common stock dividend effective with the first quarter 2012 dividend payment. In addition, during the first nine months of 2012, we repurchased $14.0 million of common stock under our May 2011 share repurchase program and $91.0 million of common stock to fulfill exercised stock options and restricted stock awards. During the first nine months of 2011, we repurchased $75.0 million of common stock under our May 2011 share repurchase program and $60.1 million of common stock to fulfill exercised stock options and restricted stock awards.

### CAPITAL RESOURCES AND REQUIREMENTS

### Working Capital

As of September 30, 2012, our current liabilities exceeded our current assets by approximately $302.2 million. We do not expect this to have any impact on our liquidity because we believe we have adequate back-up lines of credit in place, as well as access to the capital markets to finance our construction program and to refinance current maturities of long-term debt. We expect to issue long-term debt during the fourth quarter, depending on market conditions and other factors.

### Liquidity

We anticipate meeting our capital requirements during the remainder of 2012 and beyond primarily through internally generated funds and short-term borrowings, supplemented by the issuance of intermediate or long-term debt securities, depending on market conditions and other factors.

We currently have access to the capital markets and have been able to generate funds internally and externally to meet our capital requirements. Our ability to attract the necessary financial capital at reasonable terms is critical to our overall strategic plan. We currently believe that we have adequate capacity to fund our operations for the foreseeable future through our existing borrowing arrangements, access to capital markets and internally generated cash.

Wisconsin Energy, Wisconsin Electric and Wisconsin Gas maintain bank back-up credit facilities, which provide liquidity support for each company's obligations with respect to commercial paper and for general corporate purposes.

As of September 30, 2012, we had approximately $1.2 billion of available, undrawn lines under our bank back-up credit facilities, and approximately $453.2 million of commercial paper outstanding on a consolidated basis that was supported by the available lines of credit. During the first nine months of 2012, our maximum commercial paper outstanding was $669.9 million with a weighted-average interest rate of 0.28%.

We review our bank back-up credit facility needs on an ongoing basis and expect to be able to maintain adequate

*September 2012* 33 *Wisconsin Energy Corporation* credit facilities to support our operations. The following table summarizes such facilities as of September 30, 2012:

| Company | Total Facility (Millions of Dollars) | Letters of Credit | Credit Available | Facility Expiration |
| --- | ---: | ---: | ---: | --- |
| Wisconsin Energy | $450.0 | $0.4 | $449.6 | December 2013 |
| Wisconsin Electric | $500.0 | $5.9 | $494.1 | December 2013 |
| Wisconsin Gas | $300.0 | $— | $300.0 | December 2013 |

The following table shows our capitalization structure as of September 30, 2012, as well as an adjusted capitalization structure that we believe is consistent with the manner in which the rating agencies currently view Wisconsin Energy's 2007 Series A Junior Subordinated notes (Junior Notes):

| Capitalization Structure | Actual (Millions of Dollars) | Adjusted |
| --- | ---: | ---: |
| Common Equity | $4,147.2 | $4,397.2 |
| Preferred Stock of Subsidiary | 30.4 | 30.4 |
| Long-Term Debt (including current maturities) | 4,621.7 | 4,371.7 |
| Short-Term Debt | 453.2 | 453.2 |
| Total Capitalization | $9,252.5 | $9,252.5 |
| Total Debt | $5,074.9 | $4,824.9 |
| Ratio of Debt to Total Capitalization | 54.8% | 52.1% |

Included in Long-Term Debt on our Consolidated Condensed Balance Sheet as of September 30, 2012 is $500 million aggregate principal amount of the Junior Notes. The adjusted presentation attributes $250 million of the Junior Notes to Common Equity and $250 million to Long-Term Debt. We believe this presentation is consistent with the 50% or greater equity credit the majority of rating agencies currently attribute to the Junior Notes.

The adjusted presentation of our consolidated capitalization structure is presented as a complement to our capitalization structure presented in accordance with GAAP. Management evaluates and manages Wisconsin Energy's capitalization structure, including its total debt to total capitalization ratio, using the GAAP calculation as adjusted by the rating agency treatment of the Junior Notes. Therefore, we believe the non-GAAP adjusted presentation reflecting this treatment is useful and relevant to investors in understanding how management and the rating agencies evaluate our capitalization structure.

Wisconsin Electric is the obligor under two series of tax-exempt pollution control refunding bonds in outstanding principal amounts of $147 million. In August 2009, Wisconsin Electric terminated letters of credit that provided credit and liquidity support for the bonds, which resulted in a mandatory tender of the bonds. Wisconsin Electric issued commercial paper to fund the purchase of the bonds. As of September 30, 2012, the repurchased bonds were still outstanding, but were reported as a reduction in our consolidated long-term debt because they are held by Wisconsin Electric. Depending on market conditions and other factors, Wisconsin Electric may change the method used to determine the interest rate on the bonds and have them remarketed to third parties.

### Credit Rating Risk

Access to capital markets at a reasonable cost is determined in large part by credit quality. Any credit ratings downgrade could impact our ability to access capital markets.

Subject to other factors affecting the credit markets as a whole, we believe our current ratings should provide a significant degree of flexibility in obtaining funds on competitive terms. However, security ratings reflect the views of the rating agencies only. An explanation of the significance of the ratings may be obtained from each rating agency. Such ratings are not a recommendation to buy, sell or hold securities. Any rating can be revised upward or

*September 2012* 34 *Wisconsin Energy Corporation* downward or withdrawn at any time by a rating agency.

See Capital Resources and Requirements -- Credit Rating Risk in Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations in our 2011 Annual Report on Form 10-K for additional information related to our credit rating risk.

### Capital Requirements

***Capital Expenditures:*** Capital requirements during the remainder of 2012 are expected to be principally for capital expenditures in our utility operations relating to our electric and gas distribution systems and our biomass facility. We estimate that we will spend approximately $740 million on consolidated capital expenditures during 2012.

***Common Stock Matters:*** On May 5, 2011, Wisconsin Energy's Board of Directors authorized a share repurchase program for up to $300 million of our common stock through the end of 2013. Funds for the repurchases are expected to come from internally generated funds and working capital supplemented, if required in the short-term, by the sale of commercial paper. The repurchase program does not obligate Wisconsin Energy to acquire any specific number of shares and may be suspended or terminated by the Board of Directors at any time. Through September 30, 2012, we have acquired approximately 3.6 million shares in the open market at a cost of $114.0 million pursuant to this program. For additional information regarding the share repurchases, see Part II, Item 2 - Unregistered Sales of Equity Securities and Use of Proceeds.

On January 19, 2012, our Board of Directors approved a new dividend policy. Pursuant to this new policy, we will target a dividend payout ratio that trends toward 60% of earnings in the year 2014. At the same time, in accordance with that policy, our Board of Directors increased our quarterly dividend to $0.30 per share effective with the first quarter 2012 dividend payment, which would result in annual dividends of $1.20 per share.

***Off-Balance Sheet Arrangements:*** We are a party to various financial instruments with off-balance sheet risk as a part of our normal course of business, including financial guarantees and letters of credit which support construction projects, commodity contracts and other payment obligations. We continue to believe that these agreements do not have, and are not reasonably likely to have, a current or future effect on our financial condition, changes in financial condition, revenues or expenses, results of operations, liquidity, capital expenditures or capital resources that is material to our investors. For further information, see Note 10 -- Variable Interest Entities in the Notes to Consolidated Condensed Financial Statements in this report.

***Contractual Obligations/Commercial Commitments:*** Our total contractual obligations and other commercial commitments were approximately $21.5 billion as of September 30, 2012 compared with $22.2 billion as of December 31, 2011.

### FACTORS AFFECTING RESULTS, LIQUIDITY AND CAPITAL RESOURCES

The following is a discussion of certain factors that may affect our results of operations, liquidity and capital resources. The following discussion should be read together with the information under the heading "Factors Affecting Results, Liquidity and Capital Resources" in Item 7 of our 2011 Annual Report on Form 10-K, which provides a more complete discussion of factors affecting us, including market risks and other significant risks, our PTF strategy, utility rates and regulatory matters, electric system reliability, environmental matters, legal matters, industry restructuring and competition and other matters.

### POWER THE FUTURE

All of the PTF units are in service and are positioned to provide a significant portion of our future generation needs. We are recovering our costs in these units through lease payments associated with PWGS 1, PWGS 2, OC 1 and OC 2 that are billed from We Power to Wisconsin Electric and then recovered in Wisconsin Electric's rates as authorized by the PSCW, the Michigan Public Service Commission (MPSC) and FERC. See Factors Affecting Results, Liquidity and Capital Resources -- Power the Future in Item 7 of our 2011 Annual Report on Form 10-K for additional information on PTF.

*September 2012* 35 *Wisconsin Energy Corporation*

### UTILITY RATES AND REGULATORY MATTERS

***2013 Wisconsin Rate Case:*** On March 23, 2012, Wisconsin Electric and Wisconsin Gas initiated rate proceedings with the PSCW. Wisconsin Electric has asked the PSCW to approve a net bill increase related to non-fuel costs for its Wisconsin retail electric customers of approximately $99.3 million (3.6%) for 2013. This proposed increase reflects an offset to the revenue requirement of approximately $73.3 million related to the proceeds of a renewable energy cash grant we expect to receive under the National Defense Authorization Act upon completion of our biomass facility currently under construction. Wisconsin Electric's proposed plan, if approved by the PSCW, would return the proceeds from the cash grant to customers in the form of bill credits.

Absent the bill credits, the total electric rate increase requested by Wisconsin Electric is approximately $172.6 million (6.2%) for 2013. Wisconsin Electric is requesting an additional increase in electric rates of approximately $37.4 million in 2014, which would result in a 3.6% net bill increase for its Wisconsin retail electric customers. Wisconsin Electric also filed its fuel cost plan for 2013 with the PSCW as required by the Wisconsin fuel rules.

For its natural gas customers, Wisconsin Electric requested a rate decrease of approximately $1.2 million (0.2%) for 2013 with no rate adjustment for 2014. In addition, Wisconsin Electric requested rate increases of approximately $1.3 million (6.0%) for its Valley steam utility customers in 2013 and 2014, and approximately $1.0 million (7.0%) and $1.0 million (6.0%) for its Milwaukee County steam utility customers in 2013 and 2014, respectively.

Wisconsin Gas has asked the PSCW to approve a rate decrease for its natural gas customers of approximately $15.9 million (2.3%) for 2013, with no rate adjustment for 2014.

We anticipate a final written order from the PSCW by the end of the year.

***2012 Wisconsin Rate Case:*** On May 26, 2011, Wisconsin Electric and Wisconsin Gas filed an application with the PSCW to initiate rate proceedings. In lieu of a traditional rate proceeding, we requested an alternative approach, which results in no increase in 2012 base rates for our customers. In order for us to proceed under this alternative approach, Wisconsin Electric and Wisconsin Gas requested that the PSCW issue an order that:

- Authorizes Wisconsin Electric to suspend the amortization of $148 million of regulatory costs during 2012, with amortization to begin again in 2013.
- Authorizes $148 million of carrying costs and depreciation on previously authorized air quality and renewable energy projects, effective January 1, 2012.
- Authorizes the refund of $26 million of net proceeds from Wisconsin Electric's settlement of the spent nuclear fuel litigation with the DOE.
- Authorizes Wisconsin Electric to reopen the rate proceeding in 2012 to address, for rates effective in 2013, all issues set aside during 2012, including the determination of the final approved construction costs for the Oak Creek expansion (see 2013 Wisconsin Rate Case above).
- Schedules a proceeding to establish a 2012 fuel cost plan.

We received a final written order from the PSCW on November 3, 2011. For information related to the proceeding to establish a 2012 fuel cost plan, see 2012 Fuel Recovery Request below.

***2012 Michigan Rate Case:*** On July 5, 2011, Wisconsin Electric filed a $17.5 million rate increase request with the MPSC, primarily to recover the costs of environmental upgrades and OC 2. Pursuant to Michigan law, we self-implemented a $5.7 million interim electric base rate increase in January 2012. This increase was offset by a refund of $2.7 million of net proceeds from Wisconsin Electric's settlement of the spent nuclear fuel litigation with the DOE, resulting in a net $3.0 million rate increase. In addition, approximately $2.0 million of renewable costs were included in our Michigan fuel recovery rate effective January 1, 2012. The MPSC approved a total increase in electric base rates of $9.2 million annually, effective June 27, 2012, and authorized a 10.1% return on equity.

***2012 Fuel Recovery Request:*** On August 3, 2011, Wisconsin Electric filed a $50 million rate increase request with the PSCW to recover forecasted increases in fuel and purchased power costs. The primary reasons for the increase were projected higher coal, coal transportation and purchased power costs. This filing was made under the new Wisconsin fuel rules which require annual fuel cost filings. On January 5, 2012, the PSCW issued an order which provided for an increase in fuel costs of approximately $26 million, offset by approximately $26 million from

*September 2012* 36 *Wisconsin Energy Corporation* the settlement with the DOE regarding the storage of spent nuclear fuel, resulting in no change in customer bills.

***2010 Wisconsin Rate Case:*** As part of its final decision in the 2010 rate case, the PSCW authorized Wisconsin Electric to reopen the docket in 2010 to review updated 2011 fuel costs. In September 2010, Wisconsin Electric filed an application with the PSCW to reopen the docket to review updated 2011 fuel costs and to set rates for 2011 that reflect those costs. Wisconsin Electric requested an increase in 2011 Wisconsin retail electric rates of $38.4 million, or 1.4%, related to the increase in 2011 monitored fuel costs as compared to the level of monitored fuel costs then embedded in rates. In December 2010, Wisconsin Electric reduced its request by approximately $5.2 million. Adjustments by the PSCW reduced the request by an additional $7.8 million. The PSCW issued its final decision, which increased annual Wisconsin retail rates by $25.4 million effective April 29, 2011. The net increase was being driven primarily by an increase in the delivered cost of coal.

***2010 Fuel Recovery Request:*** In February 2010, Wisconsin Electric filed a $60.5 million rate increase request with the PSCW to recover forecasted increases in fuel and purchased power costs. The increase in fuel and purchased power costs was driven primarily by increases in the price of natural gas compared to the forecasted prices included in the 2010 PSCW rate case order, changes in the timing of plant outages and increased MISO costs. Effective March 25, 2010, the PSCW approved an annual increase of $60.5 million in Wisconsin retail electric rates on an interim basis. On April 28, 2011, the PSCW approved the final increase with no changes.

***Renewable Energy Portfolio:*** We are constructing a biomass-fueled power plant at Domtar Corporation's Rothschild, Wisconsin paper mill site. Wood waste and wood shavings will be used to produce approximately 50 MW of renewable electricity and will also support Domtar's sustainable papermaking operations. Construction commenced on June 27, 2011. We currently expect to invest between $245 million and $255 million, excluding AFUDC, in the plant. We are targeting completion of the facility by the end of 2013.

On July 27, 2012, we signed an agreement with NextEra Energy Resources to buy the Montfort Wind Energy Center for $27 million, subject to PSCW and FERC approval. We anticipate approval and closing of the sale by the end of 2012. We currently have a long-term power purchase agreement for 85% of the energy from the site.

***Oak Creek Air Quality Control System:*** In July 2008, we received approval from the PSCW granting Wisconsin Electric authority to construct wet flue gas desulfurization and selective catalytic reduction facilities at Oak Creek Power Plant units 5-8. Construction of these emission controls began in late July 2008. In March 2012, the wet flue gas desulfurization and selective catalytic reduction equipment for units 5 and 6 was placed into commercial operation. On September 4, 2012, the equipment for units 7 and 8 was placed into commercial operation. The final cost of completing this project is approximately $740 million ($900 million including AFUDC).

See Factors Affecting Results, Liquidity and Capital Resources -- Utility Rates and Regulatory Matters in Item 7 of our 2011 Annual Report on Form 10-K for additional information regarding our utility rates and other regulatory matters.

### ELECTRIC TRANSMISSION AND ENERGY MARKETS

As part of MISO, a market-based platform was developed for valuing transmission congestion premised upon the Locational Marginal Price (LMP) system that has been implemented in certain northeastern and mid-Atlantic states. The LMP system includes the ability to mitigate or eliminate congestion costs through Auction Revenue Rights (ARRs) and FTRs. ARRs are allocated to market participants by MISO and FTRs are purchased through auctions. A new allocation and auction was completed for the period of June 1, 2012 through May 31, 2013. The resulting ARR valuation and the secured FTRs should mitigate our transmission congestion risk for that period.

### ENVIRONMENTAL MATTERS

### Air Quality

***Mercury and Other Hazardous Air Pollutants:*** In December 2011, the EPA issued the final MATS rule, which imposes stringent limitations on numerous hazardous air pollutants, including mercury, from coal and oil-fired electric generating units. While we are continuing to evaluate the impact of the rule on the operation of our existing coal-fired generation facilities, as well as alternatives for complying with the rule, we currently estimate our capital

*September 2012* 37 *Wisconsin Energy Corporation* cost to comply with this rule will be approximately $8 million to $12.5 million. Based upon our review of the rules and plans to convert the VAPP from coal to natural gas fuel, we currently anticipate that only the Presque Isle Power Plant will require modifications. We believe that our clean air strategy, including the environmental upgrades that have been constructed and that are currently under construction at our other coal-fired plants, positions those other plants well to meet the rule's requirements.

***Cross-State Air Pollution Rule:*** In August 2011, the EPA issued a final rule, the Cross-State Air Pollution Rule (CSAPR), formerly known as the Clean Air Transport Rule. This rule was proposed in 2010 to replace the Clean Air Interstate Rule (CAIR), which had been remanded to the EPA in 2008. The stated purpose of the CSAPR is to limit the interstate transport of emissions of Nitrogen Oxide and SO2 that contribute to fine particulate matter and ozone non-attainment in downwind states through a proposed allocation scheme. In February 2012, the EPA issued final technical revisions to the rule and issued a draft final rule which together delay the implementation date for certain penalty provisions that could potentially impact the Presque Isle Power Plant and increase the number of allowances issued to the states of Michigan and Wisconsin. Even with these proposed revisions, however, the Presque Isle Power Plant may not have been allocated sufficient allowances to meet its obligations to operate and provide stability to the transmission system in the Upper Peninsula of Michigan. This situation could then put the plant at risk for certain penalties under the rule.

The rule was scheduled to become effective January 1, 2012. However, we and a number of other parties sought judicial review of the rule, and on August 21, 2012, the U.S. Court of Appeals for the District of Columbia Circuit vacated the CSAPR, keeping the CAIR in effect. The EPA has requested the court to re-hear the case.

***Climate Change:*** Federal, state, regional and international authorities have undertaken efforts to limit greenhouse gas emissions. The regulation of greenhouse gas emissions through legislation and regulation has been, and continues to be, a focus of the President and his administration. Although legislation that would impose mandatory requirements related to greenhouse gas emissions, renewable energy standards and/or energy efficiency standards failed to pass in the U.S. Congress, we expect such legislation to be considered in the future. Any mandatory restrictions on our Carbon Dioxide emissions that may be adopted by Congress or Wisconsin's or Michigan's legislature could result in significant compliance costs that could affect future results of operations, cash flows and financial condition.

In March 2012, the EPA, using its existing authority under the Clean Air Act (CAA), proposed new source performance standards pertaining to greenhouse gas emissions from certain new power plants, including coal-fueled plants, based on the performance of combined cycle natural gas-fueled generating plants. We believe this rule effectively prohibits new conventional coal-fueled power plants. In June 2012, the U. S. Court of Appeals for the District of Columbia Circuit upheld the EPA's authority to regulate greenhouse gas emissions.

We expect the EPA to attempt to address performance standards for reconstructed and modified generating units in a future rule. Any such rule may impact our ability to do maintenance or modify our existing facilities. Depending on the extent of rate recovery and other factors, these anticipated future rules could have a material adverse impact on our financial condition. For additional information, see the caption "We may face significant costs to comply with the regulation of greenhouse gas emissions." under Item 1A Risk Factors in our 2011 Annual Report on Form 10-K.

***Valley Power Plant Conversion:*** On August 17, 2012, we announced plans to convert the fuel source for VAPP from coal to natural gas. We currently expect the cost of this conversion to be between $60 and $65 million and, subject to receipt of PSCW approval and a construction air permit from the WDNR, anticipate that the conversion will be completed no later than 2016. We expect to file for a Certificate of Authority from the PSCW during the second quarter of 2013.

In June 2012, we received approval from the PSCW to replace and upgrade the Lincoln Arthur natural gas main, which has the capability to accommodate the increased natural gas required for the conversion of VAPP to natural gas.

See Factors Affecting Results, Liquidity and Capital Resources -- Environmental Matters in Item 7 of our 2011 Annual Report on Form 10-K for additional information regarding environmental matters affecting our operations.

*September 2012* 38 *Wisconsin Energy Corporation*

### LEGAL MATTERS

***Cash Balance Pension Plan:*** In June 2009, a lawsuit was filed by Alan M. Downes, a former employee, against the Plan in the U.S. District Court for the Eastern District of Wisconsin. The complaint alleged that Plan participants who received a lump sum distribution under the Plan prior to their normal retirement age did not receive the full benefit to which they were entitled in violation of ERISA and were owed additional benefits, because the Plan failed to apply the correct interest crediting rate to project the cash balance account to their normal retirement age. In September 2010, the plaintiff filed a First Amended Class Action Complaint alleging additional claims under ERISA and adding Wisconsin Energy as a defendant.

In November 2011, we entered into a settlement agreement with the plaintiffs for $45.0 million, and the court promptly issued an order preliminarily approving the settlement. As part of the settlement agreement, we agreed to class certification for all similarly situated plaintiffs. The resolution of this matter resulted in a cost of less than $0.04 per share for 2011 after considering insurance and reserves established in the prior year. The court approved the settlement on April 3, 2012 and issued its written order on April 20, 2012. Substantially all payments to class members have been made pursuant to the settlement. We do not anticipate further charges as a result of the settlement.

### NUCLEAR OPERATIONS

***Used Nuclear Fuel Storage and Disposal:*** The Nuclear Waste Policy Act established the Nuclear Waste Fund, which is composed of payments made by the generators and owners of nuclear plants. Wisconsin Electric owned Point Beach through September 2007 and placed approximately $215.2 million into this fund. Effective January 31, 1998, the DOE failed to meet its contractual obligation to begin removing used fuel from Point Beach. Wisconsin Electric filed a complaint in November 2000 against the DOE in the Court of Federal Claims for failure to begin performance. In December 2009, the Court ruled in favor of Wisconsin Electric, granting us more than $50 million in damages. In February 2010, the DOE filed an appeal. We negotiated a settlement with the DOE for $45.5 million, which we received in the first quarter of 2011. This amount, net of costs incurred, is being returned to customers as part of the PSCW's approval of our 2012 fuel recovery request and the MPSC's rate order in our 2012 Michigan rate case.

### OTHER MATTERS

***Oak Creek Expansion Fuel Flexibility Project:*** The Oak Creek expansion units were designed and permitted to use bituminous coal from the Eastern United States rather than sub-bituminous coal. Market forces have resulted in a significant price differential between bituminous and sub-bituminous coals. We have applied for a new air permit from the WDNR to modify the Oak Creek expansion units for potential future use of sub-bituminous coal. Upon receiving an air permit, we intend to begin testing sub-bituminous coal in various combinations with bituminous coal to identify any equipment limitations that should be considered prior to filing with the PSCW for a Certificate of Authority to make the fuel flexibility modifications.

***Regulation of Derivatives and Swap Transactions:*** The Dodd-Frank Act, enacted in July 2010, provides for the regulation of derivatives and grants the CFTC expanded regulatory authority over derivative and swap transactions. The CFTC has promulgated numerous regulations that will impose additional requirements on the use of derivatives and swap transactions for us and our counterparties, which could affect both the use and cost of these instruments. Several of the rules still need to be finalized, pending the CFTC's requests for further comments on certain interim rules, interpretations and proposed exemptions, and requests for clarifications by several interested parties. Although we cannot be certain of the impact of these new rules on us until these matters are fully resolved, we currently do not expect it to be material.

*September 2012* 39 *Wisconsin Energy Corporation*

## Market risk

As filed, 657 characters.

There have been no material changes related to market risk from the disclosures presented in our Annual Report on Form 10-K for the year ended December 31, 2011. For information concerning market risk exposures at Wisconsin Energy Corporation, see Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations -- Factors Affecting Results, Liquidity and Capital Resources -- Market Risks and Other Significant Risks, in Part II of our 2011 Annual Report on Form 10-K, as well as Note 6 -- Fair Value Measurements and Note 7 -- Derivative Instruments in the Notes to Consolidated Condensed Financial Statements in this report.

## Controls and procedures

As filed, 1,416 characters.

***Disclosure Controls and Procedures:*** Our management, with the participation of our principal executive officer and principal financial officer, has evaluated the effectiveness of our disclosure controls and procedures (as such term is defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act) as of the end of the period covered by this report. Based upon such evaluation, our principal executive officer and principal financial officer have concluded that, as of the end of such period, our disclosure controls and procedures are effective (i) in recording, processing, summarizing and reporting, on a timely basis, information required to be disclosed by us in the reports that we file or submit under the Exchange Act and (ii) to ensure that information required to be disclosed in the reports that we file or submit under the Exchange Act is accumulated and communicated to our management, including our principal executive officer and principal financial officer, to allow timely decisions regarding required disclosure.

***Internal Control Over Financial Reporting:*** There has not been any change in our internal control over financial reporting (as such term is defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) during the fiscal quarter to which this report relates that has materially affected, or is reasonably likely to materially affect, our internal control over financial reporting.

## Risk factors

As filed, 315 characters.

There have been no material changes from the risk factors presented in our Annual Report on Form 10-K for the year ended December 31, 2011. See Item 1A. Risk Factors in our 2011 Annual Report on Form 10-K for a discussion of certain risk factors applicable to us.

*September 2012* 41 *Wisconsin Energy Corporation*

Filed Nov 2, 2012.
Source: SEC EDGAR, the filing index for accession 0000107815-12-000132. Last ingested by Listed: Nov 24, 2026, 04:24 ET. No prices; not investment advice.