# WEC Energy Group, Inc.: Form 10-Q for the period ended Sep 30, 2013

- Company: [WEC Energy Group, Inc.](/companies/wec.md) (CIK 783325)
- Form: 10-Q
- Filed: 2013-11-01
- Accepted by EDGAR: Nov 1, 2013, 14:38 ET
- Period: 2013-09-30
- Accession: 0000107815-13-000133
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/783325/000010781513000133/wec0930201310q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/783325/000010781513000133/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2013-09-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2013-07-01 to 2013-09-30 | $1.05bn | us-gaap:Revenues |
| Revenue | 9 months, 2013-01-01 to 2013-09-30 | $3.34bn | us-gaap:Revenues |
| Operating income | 3 months, 2013-07-01 to 2013-09-30 | $258.0m | us-gaap:OperatingIncomeLoss |
| Operating income | 9 months, 2013-01-01 to 2013-09-30 | $808.5m | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2013-07-01 to 2013-09-30 | $62.0m | us-gaap:InterestExpense |
| Interest expense | 9 months, 2013-01-01 to 2013-09-30 | $190.3m | us-gaap:InterestExpense |
| Income tax | 3 months, 2013-07-01 to 2013-09-30 | $80.7m | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 9 months, 2013-01-01 to 2013-09-30 | $251.4m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2013-07-01 to 2013-09-30 | $137.5m | us-gaap:NetIncomeLoss |
| Net income | 9 months, 2013-01-01 to 2013-09-30 | $433.1m | us-gaap:NetIncomeLoss |
| Diluted shares (weighted) | 3 months, 2013-07-01 to 2013-09-30 | 228,800,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 9 months, 2013-01-01 to 2013-09-30 | 230,200,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 9 months, 2013-01-01 to 2013-09-30 | $1.05bn | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 3 months, 2013-07-01 to 2013-09-30 | $190.4m | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Capital expenditure | 9 months, 2013-01-01 to 2013-09-30 | $497.7m | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Dividends paid | 9 months, 2013-01-01 to 2013-09-30 | $242.3m | us-gaap:PaymentsOfDividendsCommonStock |
| Share repurchases | 9 months, 2013-01-01 to 2013-09-30 | $187.9m | us-gaap:PaymentsForRepurchaseOfCommonStock |
| Cash and equivalents | at 2013-09-30 | $18.5m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2013-09-30 | $1.24bn | us-gaap:AssetsCurrent |
| Total assets | at 2013-09-30 | $14.37bn | us-gaap:Assets |
| Current liabilities | at 2013-09-30 | $1.29bn | us-gaap:LiabilitiesCurrent |
| Long-term debt | at 2013-09-30 | $4.37bn | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2013-09-30 | $371.0m | us-gaap:LongTermDebtCurrent |
| Short-term borrowings | at 2013-09-30 | $361.8m | us-gaap:CommercialPaper |
| Shares outstanding | at 2013-09-30 | 226,519,569 shares | dei:EntityCommonStockSharesOutstanding |

## Management's discussion and analysis

As filed, 62,334 characters.

### AND RESULTS OF OPERATIONS

### RESULTS OF OPERATIONS -- THREE MONTHS ENDED SEPTEMBER 30, 2013

### CONSOLIDATED EARNINGS

The following table compares our operating income by business segment and our net income during the third quarter of 2013 with the third quarter of 2012, including favorable (better (B)) or unfavorable (worse (W)) variances:

*(Millions of Dollars, Except Per Share Amounts)*

|  | Three Months Ended September 30 2013 | B (W) | 2012 |
| --- | ---: | ---: | ---: |
| Utility Energy Segment | $166.6 | $(24.4) | $191.0 |
| Non-Utility Energy Segment | 93.2 | 1.7 | 91.5 |
| Corporate and Other | (1.8) | 0.1 | (1.9) |
| Total Operating Income | 258.0 | (22.6) | 280.6 |
| Equity in Earnings of Transmission Affiliate | 17.1 | — | 17.1 |
| Other Income, net | 5.1 | (3.9) | 9.0 |
| Interest Expense, net | 62.0 | (1.1) | 60.9 |
| Income Before Income Taxes | 218.2 | (27.6) | 245.8 |
| Income Tax Expense | 80.7 | 9.0 | 89.7 |
| Net Income | $137.5 | $(18.6) | $156.1 |
| Diluted Earnings Per Share | $0.60 | $(0.07) | $0.67 |

### UTILITY ENERGY SEGMENT CONTRIBUTION TO OPERATING INCOME

Our utility energy segment contributed $166.6 million of operating income during the third quarter of 2013, a decrease of $24.4 million, or 12.8%, compared with the third quarter of 2012. The following table summarizes the operating income of this segment between the comparative quarters:

| Utility Energy Segment Operating Revenues | Three Months Ended September 30 2013 (Millions of Dollars) | B (W) | 2012 |
| --- | ---: | ---: | ---: |
| Electric | $911.0 | $9.8 | $901.2 |
| Gas | 120.6 | 3.9 | 116.7 |
| Other | 5.6 | 0.2 | 5.4 |
| Total Operating Revenues | 1,037.2 | 13.9 | 1,023.3 |
| Operating Expenses |  |  |  |
| Fuel and Purchased Power | 340.4 | (2.7) | 337.7 |
| Cost of Gas Sold | 61.6 | (6.1) | 55.5 |
| Other Operation and Maintenance | 359.5 | (25.4) | 334.1 |
| Depreciation and Amortization | 79.9 | (5.2) | 74.7 |
| Property and Revenue Taxes | 29.2 | 1.1 | 30.3 |
| Total Operating Expenses | 870.6 | (38.3) | 832.3 |
| Operating Income | $166.6 | $(24.4) | $191.0 |

*September 2013* 22 *Wisconsin Energy Corporation*

### Electric Utility Revenues and Sales

The following table compares electric utility operating revenues and MWh sales by customer class during the third quarter of 2013 with the third quarter of 2012:

| Electric Utility Operations Customer Class | Three Months Ended September 30 Electric Revenues 2013 (Millions of Dollars) | B (W) | 2012 | MWh Sales 2013 (Thousands) | B (W) | 2012 |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Residential | $332.7 | $(7.5) | $340.2 | 2,207.7 | (214.8) | 2,422.5 |
| Small Commercial/Industrial | 287.9 | 3.7 | 284.2 | 2,381.6 | (74.7) | 2,456.3 |
| Large Commercial/Industrial | 200.2 | (0.5) | 200.7 | 2,326.3 | (159.8) | 2,486.1 |
| Other - Retail | 5.5 | 0.1 | 5.4 | 34.6 | — | 34.6 |
| Total Retail | 826.3 | (4.2) | 830.5 | 6,950.2 | (449.3) | 7,399.5 |
| Wholesale - Other | 32.6 | (7.4) | 40.0 | 405.8 | (5.9) | 411.7 |
| Resale - Utilities | 45.4 | 27.6 | 17.8 | 1,430.2 | 833.9 | 596.3 |
| Other Operating Revenues | 6.7 | (6.2) | 12.9 | — | — | — |
| Total | $911.0 | $9.8 | $901.2 | 8,786.2 | 378.7 | 8,407.5 |
| Weather -- Degree Days (a) |  |  |  |  |  |  |
| Heating (124 Normal) |  |  |  | 130 | (8) | 138 |
| Cooling (549 Normal) |  |  |  | 540 | (195) | 735 |
| (a) As measured at Mitchell International Airport in Milwaukee, Wisconsin. Normal degree days are based upon a 20-year |  |  |  |  |  |  |
| moving average. |  |  |  |  |  |  |

Our electric utility operating revenues increased by $9.8 million, or 1.1%, when compared to the third quarter of 2012. The most significant factors that caused a change in revenues were:

- Wisconsin net retail pricing increases of $31.8 million ($48.7 million less $16.9 million related to Section 1603 bill credits), which is primarily related to our 2013 Wisconsin Rate Case. For information on the Section 1603 bill credits and the rate order in the 2013 rate case, see Results of Operations -- Three Months Ended September 30, 2013 -- Section 1603 Renewable Energy Treasury Grant and Factors Affecting Results, Liquidity and Capital Resources -- Utility Rates and Regulatory Matters, respectively.
- A return to more normal weather in the third quarter of 2013 as compared to the same period in 2012 that decreased electric revenues by an estimated $31.9 million.
- A $27.6 million increase in sales for resale due to increased sales into the MISO Energy Markets as a result of increased availability of our generating units.
- A $7.4 million decrease in wholesale revenues in the third quarter of 2013 primarily due to reduced demand revenue as compared to the same period in 2012.
- A $6.2 million decrease in other operating revenues, primarily driven by the amortization of $8.0 million in 2012 related to the settlement with the DOE. See Factors Affecting Results, Liquidity and Capital Resources -- Utility Rates and Regulatory Matters -- 2012 Fuel Recovery Request.

As measured by cooling degree days, the third quarter of 2013 was 26.5% cooler than the same period in 2012 and 1.6% cooler than normal. We believe the cooler weather was the primary reason for the 8.9% decrease in residential sales. Sales to large commercial/industrial customers decreased by 6.4%, primarily because of a decrease in sales to the two iron ore mines in Michigan. If the mines are excluded, sales to our large commercial/industrial customers decreased 3.5%.

The two iron ore mines, which we served on an interruptible tariff rate, switched to an alternative electric supplier effective September 1, 2013. In addition, other smaller retail customers have switched to an alternative electric supplier. See Factors Affecting Results, Liquidity and Capital Resources - Electric Transmission and Energy Markets - Restructuring in Michigan, for a discussion of the impact of industry restructuring in Michigan on our electric sales.

*September 2013* 23 *Wisconsin Energy Corporation*

### Fuel and Purchased Power

Our fuel and purchased power costs increased by $2.7 million, or 0.8%, when compared to the third quarter of 2012. This increase was primarily caused by a 4.5% increase in total MWh sales, partially offset by lower costs as compared to the third quarter of 2012.

### Gas Utility Revenues, Gross Margin and Therm Deliveries

A comparison follows of gas utility operating revenues, gross margin and gas deliveries during the third quarter of 2013 with the third quarter of 2012. We believe gross margin is a better performance indicator than revenues because changes in the cost of gas sold flow through to revenue under gas cost recovery mechanisms. Between the comparative periods, total gas operating revenues increased by $3.9 million, or 3.3%, and cost of gas sold increased by $6.1 million, or 11.0%, due to an increase in the commodity cost of natural gas.

|  | Three Months Ended September 30 2013 (Millions of Dollars) | B (W) | 2012 |
| --- | ---: | ---: | ---: |
| Gas Operating Revenues | $120.6 | $3.9 | $116.7 |
| Cost of Gas Sold | 61.6 | (6.1) | 55.5 |
| Gross Margin | $59.0 | $(2.2) | $61.2 |

The following table compares gas utility gross margin and natural gas therm deliveries by customer class during the third quarter of 2013 with the third quarter of 2012:

| Gas Utility Operations Customer Class | Three Months Ended September 30 Gross Margin 2013 (Millions of Dollars) | B (W) | 2012 | Therm Deliveries 2013 (Millions) | B (W) | 2012 |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Residential | $37.4 | $(0.5) | $37.9 | 47.2 | 1.0 | 46.2 |
| Commercial/Industrial | 9.4 | (0.8) | 10.2 | 33.3 | 0.2 | 33.1 |
| Interruptible | 0.3 | — | 0.3 | 2.8 | 0.5 | 2.3 |
| Total Retail | 47.1 | (1.3) | 48.4 | 83.3 | 1.7 | 81.6 |
| Transported Gas | 10.9 | (0.9) | 11.8 | 236.0 | (33.7) | 269.7 |
| Other | 1.0 | — | 1.0 | — | — | — |
| Total | $59.0 | $(2.2) | $61.2 | 319.3 | (32.0) | 351.3 |
| Weather -- Degree Days (a) |  |  |  |  |  |  |
| Heating (124 Normal) |  |  |  | 130 | (8) | 138 |
| (a) As measured at Mitchell International Airport in Milwaukee, Wisconsin. Normal degree days are based upon a 20-year |  |  |  |  |  |  |
| moving average. |  |  |  |  |  |  |

Our gas margin is seasonal and is primarily driven by the heating needs of our customers. The third quarter gas margin is historically the lowest of the year because of the lack of heating load. Our gas margin decreased by $2.2 million, or approximately 3.6%, when compared to the third quarter of 2012. Gas margins were reduced by approximately $2.4 million because of lower gas rates that became effective January 1, 2013.

### Other Operation and Maintenance Expense

Our other operation and maintenance expense increased by $25.4 million, or approximately 7.6%, when compared to the third quarter of 2012. This increase was primarily driven by the reinstatement of $37.0 million of regulatory

*September 2013* 24 *Wisconsin Energy Corporation* amortizations, offset in part by a $8.2 million reduction in bad debt expense related to our natural gas customers and continued cost control efforts across the utility.

### Depreciation and Amortization Expense

Our depreciation and amortization expense increased by $5.2 million, or approximately 7.0%, when compared to the third quarter of 2012 primarily because of an overall increase in utility plant in service. The emission control equipment for units 7 and 8 of the Oak Creek Air Quality Control System (AQCS) project went into service in September 2012. For additional information, see Factors Affecting Results, Liquidity and Capital Resources -- Utility Rates and Regulatory Matters -- Oak Creek Air Quality Control System.

### Section 1603 Renewable Energy Treasury Grant

We expect to receive a treasury grant of approximately $72 million related to the construction of our biomass facility in Rothschild, Wisconsin. The PSCW took this grant into consideration when it set rates for our electric customers for the two years ending December 31, 2014. These rates became effective on January 1, 2013 and are reflected in the form of bill credits that reduce our revenues. We expect to recognize the treasury grant as income in the fourth quarter of 2013 when the plant is expected to be placed into service. At that time, we will also defer as a regulatory liability, the portion of the grant income that will be used to reduce rates in 2014. For the first three quarters of 2013, we experienced a mismatch between bill credits (lower revenues) and grant income. However, when the plant is placed into service in the fourth quarter, we will make an entry to record grant income to match the bill credits that have been provided to customers during 2013. If we recorded grant income to match the credits provided to customers, we estimate that the earnings in the first, second and third quarters would have been approximately $0.03 per share higher in each quarter.

In addition, the PSCW approved escrow accounting treatment for the treasury grant. As a result, we expect to true-up any difference between the actual grant proceeds we receive and the estimated grant proceeds the PSCW used to set electric retail rates for 2013 and 2014.

### NON-UTILITY ENERGY SEGMENT CONTRIBUTION TO OPERATING INCOME

Our non-utility energy segment consists primarily of our PTF units (Port Washington Generating Station Unit 1 (PWGS 1), Port Washington Generating Station Unit 2 (PWGS 2), Oak Creek expansion Unit 1 (OC 1) and Oak Creek expansion Unit 2 (OC 2)).

This segment reflects the lease revenues on the new units as well as the depreciation expense. Operating and maintenance costs associated with the plants are the responsibility of Wisconsin Electric and are recorded in the utility segment.

|  | Three Months Ended September 30 2013 (Millions of Dollars) | B (W) | 2012 |
| --- | ---: | ---: | ---: |
| Operating Revenues | $114.2 | $1.6 | $112.6 |
| Operation and Maintenance Expense | 4.2 | 0.1 | 4.3 |
| Depreciation Expense | 16.8 | — | 16.8 |
| Operating Income | $93.2 | $1.7 | $91.5 |

Non-utility energy segment operating income increased by $1.7 million, or approximately 1.9%, when compared to the third quarter of 2012. The increase in operating revenues is primarily related to the final approved construction costs for the Oak Creek expansion as part of the 2013 Wisconsin Rate Case.

*September 2013* 25 *Wisconsin Energy Corporation*

### CONSOLIDATED OTHER INCOME, NET

|  | Three Months Ended September 30 2013 (Millions of Dollars) | B (W) | 2012 |
| --- | ---: | ---: | ---: |
| AFUDC - Equity | $5.2 | $(3.7) | $8.9 |
| Other, net | (0.1) | (0.2) | 0.1 |
| Other Income, net | $5.1 | $(3.9) | $9.0 |

Other income, net decreased by $3.9 million, or approximately 43.3%, when compared to the third quarter of 2012. The decrease in AFUDC - Equity is primarily related to units 7 and 8 of the Oak Creek AQCS project going into service in September 2012.

### CONSOLIDATED INTEREST EXPENSE, NET

|  | Three Months Ended September 30 2013 (Millions of Dollars) | B (W) | 2012 |
| --- | ---: | ---: | ---: |
| Gross Interest Costs | $64.6 | $0.4 | $65.0 |
| Less: Capitalized Interest | 2.6 | (1.5) | 4.1 |
| Interest Expense, net | $62.0 | $(1.1) | $60.9 |

Our gross interest costs decreased by $0.4 million, or approximately 0.6%, when compared to the third quarter of 2012. Our capitalized interest decreased by $1.5 million primarily because of lower construction work in progress. As a result, our net interest expense increased by $1.1 million, or 1.8%, as compared to the third quarter of 2012.

### CONSOLIDATED INCOME TAX EXPENSE

For the third quarter of 2013, our effective tax rate applicable to continuing operations was 37.0% compared to 36.5% for the third quarter of 2012. This increase in our effective tax rate was due to reduced domestic production activities deductions and AFUDC - Equity. For additional information, see Note G -- Income Taxes in our 2012 Annual Report on Form 10-K.

*September 2013* 26 *Wisconsin Energy Corporation*

### RESULTS OF OPERATIONS -- NINE MONTHS ENDED SEPTEMBER 30, 2013

### CONSOLIDATED EARNINGS

The following table compares our operating income by business segment and our net income during the first nine months of 2013 with the first nine months of 2012, including favorable (better (B)) or unfavorable (worse (W)) variances:

*(Millions of Dollars, Except Per Share Amounts)*

|  | Nine Months Ended September 30 2013 | B (W) | 2012 |
| --- | ---: | ---: | ---: |
| Utility Energy Segment | $536.1 | $2.9 | $533.2 |
| Non-Utility Energy Segment | 276.4 | 6.2 | 270.2 |
| Corporate and Other | (4.0) | 0.5 | (4.5) |
| Total Operating Income | 808.5 | 9.6 | 798.9 |
| Equity in Earnings of Transmission Affiliate | 51.0 | 2.1 | 48.9 |
| Other Income, net | 15.3 | (18.3) | 33.6 |
| Interest Expense, net | 190.3 | (9.0) | 181.3 |
| Income Before Income Taxes | 684.5 | (15.6) | 700.1 |
| Income Tax Expense | 251.4 | 1.2 | 252.6 |
| Net Income | $433.1 | $(14.4) | $447.5 |
| Diluted Earnings Per Share | $1.88 | $(0.04) | $1.92 |

### UTILITY ENERGY SEGMENT CONTRIBUTION TO OPERATING INCOME

Our utility energy segment contributed $536.1 million of operating income during the first nine months of 2013, an increase of $2.9 million, or 0.5%, compared with the first nine months of 2012. The following table summarizes the operating income of this segment between the comparative periods:

| Utility Energy Segment Operating Revenues | Nine Months Ended September 30 2013 (Millions of Dollars) | B (W) | 2012 |
| --- | ---: | ---: | ---: |
| Electric | $2,516.5 | $65.4 | $2,451.1 |
| Gas | 751.6 | 95.3 | 656.3 |
| Other | 28.6 | 3.8 | 24.8 |
| Total Operating Revenues | 3,296.7 | 164.5 | 3,132.2 |
| Operating Expenses |  |  |  |
| Fuel and Purchased Power | 890.1 | (37.3) | 852.8 |
| Cost of Gas Sold | 446.9 | (78.9) | 368.0 |
| Other Operation and Maintenance | 1,097.7 | (28.7) | 1,069.0 |
| Depreciation and Amortization | 238.2 | (19.4) | 218.8 |
| Property and Revenue Taxes | 87.7 | 2.7 | 90.4 |
| Total Operating Expenses | 2,760.6 | (161.6) | 2,599.0 |
| Operating Income | $536.1 | $2.9 | $533.2 |

*September 2013* 27 *Wisconsin Energy Corporation*

### Electric Utility Revenues and Sales

The following table compares electric utility operating revenues and MWh sales by customer class during the first nine months of 2013 with the first nine months of 2012:

| Electric Utility Operations Customer Class | Nine Months Ended September 30 Electric Revenues 2013 (Millions of Dollars) | B (W) | 2012 | MWh Sales 2013 (Thousands) | B (W) | 2012 |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Residential | $913.1 | $21.4 | $891.7 | 6,103.6 | (250.4) | 6,354.0 |
| Small Commercial/Industrial | 798.0 | 18.9 | 779.1 | 6,700.1 | (77.2) | 6,777.3 |
| Large Commercial/Industrial | 566.4 | (2.6) | 569.0 | 6,885.6 | (454.1) | 7,339.7 |
| Other - Retail | 17.0 | 0.4 | 16.6 | 109.6 | (1.6) | 111.2 |
| Total Retail | 2,294.5 | 38.1 | 2,256.4 | 19,798.9 | (783.3) | 20,582.2 |
| Wholesale - Other | 109.3 | (3.0) | 112.3 | 1,444.7 | 331.6 | 1,113.1 |
| Resale - Utilities | 91.5 | 48.3 | 43.2 | 2,880.9 | 1,488.8 | 1,392.1 |
| Other Operating Revenues | 21.2 | (18.0) | 39.2 | — | — | — |
| Total | $2,516.5 | $65.4 | $2,451.1 | 24,124.5 | 1,037.1 | 23,087.4 |
| Weather -- Degree Days (a) |  |  |  |  |  |  |
| Heating (4,316 Normal) |  |  |  | 4,630 | 1,117 | 3,513 |
| Cooling (720 Normal) |  |  |  | 678 | (363) | 1,041 |
| (a) As measured at Mitchell International Airport in Milwaukee, Wisconsin. Normal degree days are based upon a 20-year |  |  |  |  |  |  |
| moving average. |  |  |  |  |  |  |

Our electric utility operating revenues increased by $65.4 million, or 2.7%, when compared to the first nine months of 2012. The most significant factors that caused a change in revenues were:

- Wisconsin net retail pricing increases of $87.9 million ($134.8 million less $46.9 million related to Section 1603 bill credits), which is primarily related to our 2013 Wisconsin Rate Case.
- A $48.3 million increase in sales for resale due to increased sales into the MISO Energy Markets as a result of increased availability of our generating units.
- A return to more normal weather as compared to the prior year that decreased electric revenues by an estimated $38.4 million.
- A $18.0 million decrease in other operating revenues, primarily driven by the amortization of $21.8 million in 2012 related to the settlement with the DOE.

As measured by cooling degree days, the first nine months of 2013 were 34.9% cooler than the same period in 2012 and 5.8% cooler than normal. Residential sales decreased by 3.9%, primarily because of weather. Sales to large commercial/industrial customers decreased by 6.2%, primarily because of a decrease in sales to the two iron ore mines in Michigan. If the mines are excluded, sales to our large commercial/industrial customers decreased 3.7%. Wholesale - Other sales increased by 29.8% primarily due to increased off-peak energy sales which generate lower incremental revenue because the majority of our wholesale revenue is tied to demand.

The two iron ore mines, which we served on an interruptible tariff rate, switched to an alternative electric supplier effective September 1, 2013. In addition, other smaller retail customers have switched to an alternative electric supplier. See Factors Affecting Results, Liquidity and Capital Resources - Electric Transmission and Energy Markets - Restructuring in Michigan, for a discussion of the impact of industry restructuring in Michigan on our electric sales.

### Fuel and Purchased Power

Our fuel and purchased power costs increased by $37.3 million, or 4.4%, when compared to the first nine months of 2012. This increase was primarily caused by a 4.5% increase in total MWh sales.

*September 2013* 28 *Wisconsin Energy Corporation*

### Gas Utility Revenues, Gross Margin and Therm Deliveries

A comparison follows of gas utility operating revenues, gross margin and gas deliveries during the first nine months of 2013 with the first nine months of 2012. We believe gross margin is a better performance indicator than revenues because changes in the cost of gas sold flow through to revenue under gas cost recovery mechanisms. Between the comparative periods, total gas operating revenues increased by $95.3 million, or 14.5%, and cost of gas sold increased by $78.9 million, or 21.4%, due to cooler weather and an increase in the commodity cost of natural gas.

|  | Nine Months Ended September 30 2013 (Millions of Dollars) | B (W) | 2012 |
| --- | ---: | ---: | ---: |
| Gas Operating Revenues | $751.6 | $95.3 | $656.3 |
| Cost of Gas Sold | 446.9 | (78.9) | 368.0 |
| Gross Margin | $304.7 | $16.4 | $288.3 |

The following table compares gas utility gross margin and natural gas therm deliveries by customer class during the first nine months of 2013 with the first nine months of 2012:

| Gas Utility Operations Customer Class | Nine Months Ended September 30 Gross Margin 2013 (Millions of Dollars) | B (W) | 2012 | Therm Deliveries 2013 (Millions) | B (W) | 2012 |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Residential | $196.0 | $11.5 | $184.5 | 567.8 | 130.9 | 436.9 |
| Commercial/Industrial | 65.5 | 6.1 | 59.4 | 332.2 | 78.0 | 254.2 |
| Interruptible | 1.3 | 0.1 | 1.2 | 12.9 | 3.0 | 9.9 |
| Total Retail | 262.8 | 17.7 | 245.1 | 912.9 | 211.9 | 701.0 |
| Transported Gas | 37.4 | (1.2) | 38.6 | 777.7 | (99.2) | 876.9 |
| Other | 4.5 | (0.1) | 4.6 | — | — | — |
| Total | $304.7 | $16.4 | $288.3 | 1,690.6 | 112.7 | 1,577.9 |
| Weather -- Degree Days (a) |  |  |  |  |  |  |
| Heating (4,316 Normal) |  |  |  | 4,630 | 1,117 | 3,513 |
| (a) As measured at Mitchell International Airport in Milwaukee, Wisconsin. Normal degree days are based upon a 20-year |  |  |  |  |  |  |
| moving average. |  |  |  |  |  |  |

Our gas margin increased by $16.4 million, or approximately 5.7%, when compared to the first nine months of 2012. This increase primarily relates to an increase in sales volumes as a result of cooler weather during the first nine months of 2013 that increased heating loads. We estimate that weather increased gas margins by approximately $40.4 million. As measured by heating degree days, the first nine months of 2013 were 31.8% cooler than the same period in 2012 and 7.3% cooler than normal. Gas margins were reduced by approximately $28.4 million because of lower gas rates that became effective January 1, 2013.

### Other Operation and Maintenance Expense

Our other operation and maintenance expense increased by $28.7 million, or approximately 2.7%, when compared to the first nine months of 2012. This increase was primarily driven by the reinstatement of $111.0 million of regulatory amortizations, offset in part by a $35.1 million reduction in bad debt expense related to our natural gas customers and continued cost control efforts across the utility.

*September 2013* 29 *Wisconsin Energy Corporation*

### Depreciation and Amortization Expense

Our depreciation and amortization expense increased by $19.4 million, or approximately 8.9%, when compared to the first nine months of 2012 primarily because of an overall increase in utility plant in service. The emission control equipment for units 5 and 6 of the Oak Creek AQCS project went into service in March 2012, and for units 7 and 8 in September 2012.

### Section 1603 Renewable Energy Treasury Grant

For a discussion of the impact of the Section 1603 renewable energy treasury grant on our results of operations, see Results of Operations -- Three Months Ended September 30, 2013 -- Section 1603 Renewable Energy Treasury Grant.

### NON-UTILITY ENERGY SEGMENT CONTRIBUTION TO OPERATING INCOME

This segment reflects the lease revenues associated with PWGS 1, PWGS 2, OC 1 and OC 2, as well as the depreciation expense. The operating and maintenance costs associated with the plants are the responsibility of Wisconsin Electric and are recorded in the utility segment.

|  | Nine Months Ended September 30 2013 (Millions of Dollars) | B (W) | 2012 |
| --- | ---: | ---: | ---: |
| Operating Revenues | $337.3 | $5.1 | $332.2 |
| Operation and Maintenance Expense | 10.6 | 1.1 | 11.7 |
| Depreciation Expense | 50.3 | — | 50.3 |
| Operating Income | $276.4 | $6.2 | $270.2 |

Non-utility energy segment operating income increased by $6.2 million, or approximately 2.3%, when compared to the first nine months of 2012. The increase in operating revenues is primarily related to the final approved construction costs for the Oak Creek expansion as part of the 2013 Wisconsin Rate Case.

### CONSOLIDATED OTHER INCOME, NET

|  | Nine Months Ended September 30 2013 (Millions of Dollars) | B (W) | 2012 |
| --- | ---: | ---: | ---: |
| AFUDC - Equity | $14.1 | $(17.6) | $31.7 |
| Other, net | 1.2 | (0.7) | 1.9 |
| Other Income, net | $15.3 | $(18.3) | $33.6 |

Other income, net decreased by $18.3 million, or approximately 54.5%, when compared to the first nine months of 2012. The decrease in AFUDC - Equity is primarily related to the Oak Creek AQCS project which emission control equipment went into service in March 2012 for units 5 and 6 and September 2012 for units 7 and 8.

*September 2013* 30 *Wisconsin Energy Corporation*

### CONSOLIDATED INTEREST EXPENSE, NET

|  | Nine Months Ended September 30 2013 (Millions of Dollars) | B (W) | 2012 |
| --- | ---: | ---: | ---: |
| Gross Interest Costs | $197.4 | $(2.0) | $195.4 |
| Less: Capitalized Interest | 7.1 | (7.0) | 14.1 |
| Interest Expense, net | $190.3 | $(9.0) | $181.3 |

Our gross interest costs increased by $2.0 million, or approximately 1.0%, when compared to the first nine months of 2012. Our capitalized interest decreased by $7.0 million primarily because of lower construction work in progress. As a result, our net interest expense increased by $9.0 million, or 5.0%, as compared to the first nine months of 2012.

### CONSOLIDATED INCOME TAX EXPENSE

For the first nine months of 2013, our effective tax rate applicable to continuing operations was 36.7% compared to 36.1% for the first nine months of 2012. This increase in our effective tax rate was due to reduced domestic production activities deductions and AFUDC - Equity. For additional information, see Note G -- Income Taxes in our 2012 Annual Report on Form 10-K. We expect our 2013 annual effective tax rate to be between 36% and 37%.

### LIQUIDITY AND CAPITAL RESOURCES

### CASH FLOWS

The following summarizes our cash flows during the nine months ended September 30:

| Cash Provided by (Used in) | 2013 (Millions of Dollars) | 2012 |
| --- | ---: | ---: |
| Operating Activities | $1,050.3 | $992.4 |
| Investing Activities | $(544.8) | $(491.4) |
| Financing Activities | $(522.6) | $(502.1) |

### Operating Activities

Cash provided by operating activities increased by $57.9 million during the first nine months of 2013 as compared to the same period in 2012. The increase is primarily because of lower contributions to our benefit plans. During the first nine months of 2013, we made no contributions to our benefit plans, compared to contributions of $100 million during the first nine months of 2012. In addition, we had higher depreciation expense and higher amortization expense. Included in the higher amortization expense is a $64.7 million increase in the amortization of regulatory items. Partially offsetting these items are lower net income and higher working capital requirements.

### Investing Activities

Cash used in investing activities increased by $53.4 million during the first nine months of 2013 as compared to the same period in 2012. Our change in restricted cash decreased by $33.3 million which is related to the 2012 release of restricted cash through bill credits and reimbursements of costs associated with the DOE settlement. Our capital expenditures increased by $20.2 million during the first nine months of 2013 as compared to the same period in 2012, primarily because of the increase in spending on upgrades to our utility infrastructure.

*September 2013* 31 *Wisconsin Energy Corporation*

### Financing Activities

Cash used in financing activities increased by $20.5 million during the first nine months of 2013 as compared to the same period in 2012. During the first nine months of 2013, we retired $345.9 million more of long-term debt as compared to the same period in 2012. In addition, Wisconsin Electric issued $250 million of long-term debt in June 2013. The net proceeds of the debt issuance were used to repay short-term debt and for other corporate purposes. During the first nine months of 2013, we repurchased $103.0 million of common stock under our May 2011 share repurchase program and another $84.9 million of common stock to fulfill exercised stock options and restricted stock awards, compared to $14.0 million and $91.0 million, respectively, during the same period in 2012. Our dividends paid on common stock increased by $34.9 million in the first nine months of 2013 as compared to the same period last year, as a result of increases in the quarterly common stock dividend of 13.3% and 12.5% in the first quarter and third quarter, respectively. These factors were partially offset by a decrease in the amount of short-term debt we repaid in 2013. During the first nine months, repayment of short-term debt was $183.9 million lower in 2013 as compared to the same period in 2012.

### CAPITAL RESOURCES AND REQUIREMENTS

### Working Capital

As of September 30, 2013, our current liabilities exceeded our current assets by approximately $53.0 million. We do not expect this to have any impact on our liquidity because we believe we have adequate back-up lines of credit in place for on-going operations. We also have access to the capital markets to finance our construction program and to refinance current maturities of long-term debt if necessary.

### Liquidity

We anticipate meeting our capital requirements during the remainder of 2013 and beyond primarily through internally generated funds and short-term borrowings, supplemented by the issuance of intermediate or long-term debt securities, depending on market conditions and other factors.

We currently have access to the capital markets and have been able to generate funds internally and externally to meet our capital requirements. Our ability to attract the necessary financial capital at reasonable terms is critical to our overall strategic plan. We currently believe that we have adequate capacity to fund our operations for the foreseeable future through our existing borrowing arrangements, access to capital markets and internally generated cash.

Wisconsin Energy, Wisconsin Electric and Wisconsin Gas maintain bank back-up credit facilities, which provide liquidity support for each company's obligations with respect to commercial paper and for general corporate purposes.

As of September 30, 2013, we had approximately $1.2 billion of available, undrawn lines under our bank back-up credit facilities, and approximately $361.8 million of commercial paper outstanding on a consolidated basis that was supported by the available lines of credit. During the first nine months of 2013, our maximum commercial paper outstanding was $594.5 million with a weighted-average interest rate of 0.26%.

We review our bank back-up credit facility needs on an ongoing basis and expect to be able to maintain adequate credit facilities to support our operations. The following table summarizes such facilities as of September 30, 2013:

| Company | Total Facility (Millions of Dollars) | Letters of Credit | Credit Available | Facility Expiration |
| --- | ---: | ---: | ---: | --- |
| Wisconsin Energy | $400.0 | $0.1 | $399.9 | December 2017 |
| Wisconsin Electric | $500.0 | $6.1 | $493.9 | December 2017 |
| Wisconsin Gas | $350.0 | $— | $350.0 | December 2017 |

*September 2013* 32 *Wisconsin Energy Corporation*

The following table shows our capitalization structure as of September 30, 2013, as well as an adjusted capitalization structure that we believe is consistent with the manner in which the rating agencies currently view Wisconsin Energy's 2007 Series A Junior Subordinated notes due 2067 (Junior Notes):

| Capitalization Structure | Actual (Millions of Dollars) | Adjusted |
| --- | ---: | ---: |
| Common Equity | $4,198.1 | $4,448.1 |
| Preferred Stock of Subsidiary | 30.4 | 30.4 |
| Long-Term Debt (including current maturities) | 4,741.9 | 4,491.9 |
| Short-Term Debt | 361.8 | 361.8 |
| Total Capitalization | $9,332.2 | $9,332.2 |
| Total Debt | $5,103.7 | $4,853.7 |
| Ratio of Debt to Total Capitalization | 54.7% | 52.0% |

Included in Long-Term Debt on our Consolidated Condensed Balance Sheet as of September 30, 2013 is $500 million aggregate principal amount of the Junior Notes. The adjusted presentation attributes $250 million of the Junior Notes to Common Equity and $250 million to Long-Term Debt. We believe this presentation is consistent with the 50% or greater equity credit the majority of rating agencies currently attribute to the Junior Notes.

The adjusted presentation of our consolidated capitalization structure is presented as a complement to our capitalization structure presented in accordance with GAAP. Management evaluates and manages Wisconsin Energy's capitalization structure, including its total debt to total capitalization ratio, using the GAAP calculation as adjusted by the rating agency treatment of the Junior Notes. Therefore, we believe the non-GAAP adjusted presentation reflecting this treatment is useful and relevant to investors in understanding how management and the rating agencies evaluate our capitalization structure.

Wisconsin Electric is the obligor under two series of tax-exempt pollution control refunding bonds in outstanding principal amounts of $147 million. In August 2009, Wisconsin Electric terminated letters of credit that provided credit and liquidity support for the bonds, which resulted in a mandatory tender of the bonds. Wisconsin Electric issued commercial paper to fund the purchase of the bonds. As of September 30, 2013, the repurchased bonds were still outstanding, but were not reported as long-term debt because they are held by Wisconsin Electric. Depending on market conditions and other factors, Wisconsin Electric may change the method used to determine the interest rate on the bonds and have them remarketed to third parties.

### Bonus Depreciation Provisions

The American Taxpayer Relief Act of 2012 was signed into law on January 2, 2013, which extended the 50% bonus depreciation rules to include assets placed in service in 2013. These rules will apply to the biomass plant we are constructing in Rothschild, which is expected to be completed during the fourth quarter of 2013. As a result of the increased federal tax depreciation for 2013 and prior years, we do not anticipate making federal income tax payments for 2013.

### Credit Rating Risk

Access to capital markets at a reasonable cost is determined in large part by credit quality. Any credit ratings downgrade could impact our ability to access capital markets.

Subject to other factors affecting the credit markets as a whole, we believe our current ratings should provide a significant degree of flexibility in obtaining funds on competitive terms. However, security ratings reflect the views of the rating agencies only. An explanation of the significance of the ratings may be obtained from each rating agency. Such ratings are not a recommendation to buy, sell or hold securities. Any rating can be revised upward or downward or withdrawn at any time by a rating agency.

*September 2013* 33 *Wisconsin Energy Corporation*

See Capital Resources and Requirements -- Credit Rating Risk in Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations in our 2012 Annual Report on Form 10-K for additional information related to our credit rating risk.

### Capital Requirements

***Capital Expenditures:*** Capital requirements during the remainder of 2013 are expected to be principally for capital expenditures in our utility operations relating to our electric and gas distribution systems and our biomass facility. We estimate that we will spend approximately $690 million on consolidated capital expenditures during 2013.

***Common Stock Matters:*** On May 5, 2011, Wisconsin Energy's Board of Directors authorized a share repurchase program for up to $300 million of our common stock through the end of 2013. We expect funds for the repurchases will continue to come from internally generated funds and working capital supplemented, if required in the short-term, by the sale of commercial paper. The repurchase program does not obligate Wisconsin Energy to acquire any specific number of shares and may be suspended or terminated by the Board of Directors at any time. Through September 30, 2013, we have acquired approximately 7.1 million shares in the open market at a cost of $254.8 million pursuant to this program. For additional information regarding the share repurchases, see Part II, Item 2 - Unregistered Sales of Equity Securities and Use of Proceeds in this report.

On July 18, 2013, the Board of Directors decided to accelerate the dividend action that was planned for the first quarter of 2014. As a result, the board declared a quarterly cash dividend of $0.3825 per share on our common stock. This represents an increase of $0.0425 per share in the quarterly dividend, and raises the annual dividend rate from $1.36 per share to $1.53 per share. The Board of Directors also affirmed our dividend policy that targets a payout ratio that trends to 65-70% in 2017.

***Off-Balance Sheet Arrangements:*** We are a party to various financial instruments with off-balance sheet risk as a part of our normal course of business, including financial guarantees and letters of credit which support construction projects, commodity contracts and other payment obligations. We continue to believe that these agreements do not have, and are not reasonably likely to have, a current or future effect on our financial condition, changes in financial condition, revenues or expenses, results of operations, liquidity, capital expenditures or capital resources that is material to our investors. For further information, see Note 9 -- Variable Interest Entities in the Notes to Consolidated Condensed Financial Statements in this report.

***Contractual Obligations/Commercial Commitments:*** Our total contractual obligations and other commercial commitments were approximately $22.4 billion as of September 30, 2013 compared with $23.1 billion as of December 31, 2012.

### FACTORS AFFECTING RESULTS, LIQUIDITY AND CAPITAL RESOURCES

The following is a discussion of certain factors that may affect our results of operations, liquidity and capital resources. The following discussion should be read together with the information under the heading "Factors Affecting Results, Liquidity and Capital Resources" in Item 7 of our 2012 Annual Report on Form 10-K, which provides a more complete discussion of factors affecting us, including market risks and other significant risks, our PTF strategy, utility rates and regulatory matters, electric system reliability, environmental matters, legal matters, industry restructuring and competition and other matters.

### POWER THE FUTURE

All of the PTF units are in service and are positioned to provide a significant portion of our future generation needs. We are recovering our costs in these units through lease payments associated with PWGS 1, PWGS 2, OC 1 and OC 2 that are billed from We Power to Wisconsin Electric and then recovered in Wisconsin Electric's rates as authorized by the PSCW, the Michigan Public Service Commission (MPSC) and FERC.

As part of our 2013 Wisconsin Rate Case, the PSCW determined that 100% of the construction costs for our Oak Creek expansion units were prudently incurred, and approved the recovery in rates of more than 99.5% of these costs. In addition, the PSCW deferred the final decision regarding $24 million related to the Oak Creek expansion

*September 2013* 34 *Wisconsin Energy Corporation* fuel flexibility project until a future rate proceeding. See Other Matters below for additional information about the fuel flexibility project.

We Power assigned its warranty rights to Wisconsin Electric upon turnover of each of the Oak Creek expansion units. The warranty claim for costs incurred to repair steam turbine corrosion damage identified on both units was scheduled to go to arbitration in October 2013, but we entered into a settlement agreement with Bechtel Power Corporation (Bechtel) on June 21, 2013 resolving the claim, as well as several other warranty claims. This settlement did not have a material impact to our financial statements. Bechtel and Wisconsin Electric continue to work through two remaining items.

Pursuant to the terms of this settlement agreement, Bechtel achieved final acceptance of both Oak Creek expansion units. In turn, we paid $5.0 million to Bechtel, which represents the amount agreed to as part of the December 2009 settlement and release agreement for achieving final acceptance.

See Factors Affecting Results, Liquidity and Capital Resources -- Power the Future in Item 7 of our 2012 Annual Report on Form 10-K for additional information on PTF.

### UTILITY RATES AND REGULATORY MATTERS

***2013 Wisconsin Rate Case:*** On March 23, 2012, Wisconsin Electric and Wisconsin Gas initiated rate proceedings with the PSCW. On December 20, 2012, the PSCW approved the following rate adjustments:

- A net bill increase related to non-fuel costs for Wisconsin Electric's Wisconsin retail electric customers of approximately $70 million (2.6%) for 2013. This amount reflects an offset of approximately $63 million (2.3%) related to the proceeds of the Section 1603 renewable energy cash grant Wisconsin Electric expects to receive upon completion of its biomass facility currently under construction. Absent this offset, the retail electric rate increase for non-fuel costs is approximately $133 million (4.8%) for 2013.
- Absent an adjustment for any remaining energy cash credits, an electric rate increase for Wisconsin Electric's Wisconsin electric customers of approximately $28 million (1.0%) for 2014.
- Recovery of a forecasted increase in fuel costs of approximately $44 million (1.6%) for 2013.
- A rate decrease of approximately $8 million (1.9%) for Wisconsin Electric's natural gas customers for 2013, with no rate adjustment in 2014. The new Wisconsin Electric rates reflect a $6.4 million reduction in bad debt expense.
- A rate decrease of approximately $34 million (5.5%) for Wisconsin Gas' natural gas customers for 2013, with no rate adjustment in 2014. The new Wisconsin Gas rates reflect a $43.8 million reduction in bad debt expense.
- An increase of approximately $1.3 million (6.0%) for Wisconsin Electric's Downtown Milwaukee (Valley) steam utility customers for 2013 and another $1.3 million (6.0%) in 2014.
- An increase of approximately $1 million (7.0%) in 2013 and $1 million (6.0%) in 2014 for Wisconsin Electric's Milwaukee County steam utility customers.

These rate adjustments were effective January 1, 2013. In addition, the PSCW indicated that Wisconsin Electric's and Wisconsin Gas' allowed return on equity would remain at 10.4% and 10.5%, respectively. The PSCW also approved escrow accounting treatment for the energy cash grant.

***2014 Fuel Recovery Request:*** On July 30, 2013, Wisconsin Electric filed its 2014 fuel plan with the PSCW requesting authority to refund Wisconsin retail electric customers approximately $30 million in the form of a fuel credit related to a reduction in delivered coal costs. We anticipate an order from the PSCW by the end of the year.

***2012 Fuel Recovery Request:*** In August 2011, Wisconsin Electric filed a $50 million rate increase request with the PSCW to recover forecasted increases in fuel and purchased power costs. The primary reasons for the increase were projected higher coal, coal transportation and purchased power costs. In January 2012, the PSCW issued an order which provided for an increase in fuel costs of approximately $26 million, offset by approximately $26 million from the settlement with the DOE regarding the storage of spent nuclear fuel, resulting in no change in customer bills. In March of this year, Wisconsin Electric filed their annual fuel reconciliation for the 2012 fuel recovery request. The reconciliation was approved by the PSCW and we received the written order on July 31, 2013.

*September 2013* 35 *Wisconsin Energy Corporation*

***Renewable Energy Portfolio:*** We are constructing a biomass-fueled power plant at Domtar Corporation's Rothschild, Wisconsin paper mill site. Wood waste and wood shavings will be used to produce approximately 50 MW of renewable electricity and will also support Domtar's sustainable papermaking operations. Construction commenced in June 2011. We currently expect to invest $269.5 million, excluding AFUDC, in the plant. We are targeting completion of the facility by the end of 2013.

***Oak Creek Air Quality Control System:*** In July 2008, we received approval from the PSCW granting Wisconsin Electric authority to construct wet flue gas desulfurization and selective catalytic reduction facilities at Oak Creek Power Plant units 5-8. Construction of these emission controls began in late July 2008. In March 2012, the wet flue gas desulfurization and selective catalytic reduction equipment for units 5 and 6 was placed into commercial operation. In September 2012, the equipment for units 7 and 8 was placed into commercial operation. The final cost of completing this project was approximately $740 million ($900 million including AFUDC). The cost of constructing these facilities has been included in our previous estimates of the costs to implement the Consent Decree we entered into with the United States Environmental Protection Agency (EPA) in 2003.

***Western Gas Lateral:*** We are projecting the need for additional capacity for our natural gas distribution network in the western part of Wisconsin to address reliability and meet customer demand. We filed an application with the PSCW seeking approval to construct a new natural gas lateral on March 28, 2013. The anticipated cost of the initial phase of this project is approximately $150 million to $170 million, excluding AFUDC.

See Factors Affecting Results, Liquidity and Capital Resources -- Utility Rates and Regulatory Matters in Item 7 of our 2012 Annual Report on Form 10-K for additional information regarding our utility rates and other regulatory matters.

### ELECTRIC TRANSMISSION AND ENERGY MARKETS

As part of MISO, a market-based platform was developed for valuing transmission congestion premised upon the Locational Marginal Price (LMP) system that has been implemented in certain northeastern and mid-Atlantic states. The LMP system includes the ability to mitigate or eliminate congestion costs through Auction Revenue Rights (ARRs) and FTRs. ARRs are allocated to market participants by MISO and FTRs are purchased through auctions. A new allocation and auction were completed for the period of June 1, 2013 through May 31, 2014. The resulting ARR valuation and the secured FTRs are expected to mitigate our transmission congestion risk for that period.

***Restructuring in Michigan:*** Under Michigan law, our retail customers may choose an alternative electric supplier to provide power supply service. The law limits customer choice to 10% of our Michigan retail load. The two iron ore mines are excluded from this cap. When a customer switches to an alternative electric supplier, we continue to provide distribution and customer service functions for the customer.

The mines, which we served on an interruptible tariff rate, switched to an alternative electric supplier effective September 1, 2013. In addition, other smaller retail customers have switched to an alternative electric supplier. Sales to these customers, including the mines, totaled 2,173.6 GWh, or 7.6% of our retail electric sales for the year ended December 31, 2012. We do not expect the loss of the mines or the other customers to have a material impact on our consolidated results of operations in 2013. Previously, the owner of the mines announced that they would shut down the Empire mine by the end of 2014 or beginning of 2015.

Before implementation of steps to mitigate the loss of these sales, we estimate that the impact of these losses in 2014 would be approximately $50 million to $54 million before income taxes. We have taken, and will continue to take, multiple steps to mitigate these losses for 2014 and going forward.

We filed a request with MISO to suspend the operation of all five units at Presque Isle Power Plant (PIPP). On October 16, 2013, MISO informed us that the operation of all units is necessary to maintain reliability in the Upper Peninsula of Michigan. As a result, we are eligible for system support resource (SSR) payments from MISO to recover costs for operating the units, and we will be working with MISO to determine the amount of the SSR payments. We expect to become eligible to receive SSR payments in February of 2014. Depending on the level of operating and maintenance expenses included in these payments and the degree to which costs for new capital investments and carrying costs for previous capital investments are reflected, these payments could range from $35 million to $82 million on an annualized basis.

*September 2013* 36 *Wisconsin Energy Corporation*

Wisconsin Electric filed an application with the MPSC requesting authority to defer all fixed production costs that would have been recovered from the customers who switched to an alternative electric supplier. In August 2013, the MPSC issued an order approving the deferral of costs allocable to our remaining Michigan retail customers. On September 30, 2013, we filed a petition for re-hearing with the MPSC requesting reconsideration of its deferral order. Our ability to collect the deferred costs will be determined in a subsequent rate proceeding.

Wisconsin Electric files bi-annual retail rate cases in Wisconsin. Our next electric rate case in Wisconsin is for rates to be implemented in January 2015. Wholesale electric rates are set under FERC formula cost-based rates and are adjusted annually. We believe that prudently incurred utility costs will be recovered in future Wisconsin retail rate cases and FERC filings.

Although the financial impact in future periods is uncertain, we expect that our net financial exposure will be immaterial if the mitigation efforts outlined above are successful.

### ENVIRONMENTAL MATTERS

### Air Quality

***Sulfur Dioxide Standard:*** In June 2010, the EPA issued a new 1 hour Sulfur Dioxide (SO2) National Ambient Air Quality Standard that became effective in August 2010. This standard represented a significant change from the previous SO2 standard. The implementation guidance for the new standard, among other things, required attainment designations to be based on modeling rather than monitoring. Traditionally, attainment designations were based on monitored data. The EPA has since advised that, based on stakeholder input, it is revisiting this implementation guidance. The EPA has issued two technical assistance documents for comment in 2013, and expects to issue a rule in 2014 that will establish requirements for characterizing SO2 air quality in priority areas.

Various parties have submitted judicial and administrative challenges to this rule, and litigation is pending in the U.S. Court of Appeals for the D.C. Circuit challenging, among other things, the stringency of the standards and the EPA's plans to require attainment designations to be based on modeling.

If the new standard remains in place, we do not believe that we will need to make any significant additional expenditure at the majority of our generating units because of prior investments in pollution control equipment. However, if the new standard does remain in place we believe that additional environmental controls will be required at PIPP located in the Upper Peninsula of Michigan. In November of 2012 we entered into a joint venture agreement with Wolverine Power Supply Cooperative, Inc. (Wolverine) whereby Wolverine would pay for the installation of the air quality control systems at PIPP and receive a minority undivided ownership interest in the plant in return.

However, in light of the recent loss of retail electric customers in Michigan due to that state’s alternative electric supplier program (see Restructuring in Michigan under Electric Transmission and Energy Markets) we are re-evaluating options related to the ownership and operation of PIPP including different alternatives for the joint venture with Wolverine. At the same time, we are analyzing several environmental compliance options at PIPP.

The new standard may also require us to make modifications at some of our smaller generation units.

***Mercury and Other Hazardous Air Pollutants:*** In December 2011, the EPA issued the final Mercury and Air Toxics Standard (MATS) rule, which imposes stringent limitations on numerous hazardous air pollutants, including mercury, from coal and oil-fired electric generating units. We currently anticipate that only PIPP will require modifications, and are currently evaluating several available options for PIPP to comply with MATS. If the joint venture with Wolverine moves forward we expect the modifications to be funded by Wolverine. In April 2013, we received a one year MATS compliance extension through April 16, 2016 from the Michigan Department of Environmental Quality (MDEQ).

***Cross-State Air Pollution Rule:*** In August 2011, the EPA issued the Cross-State Air Pollution Rule (CSAPR), formerly known as the Clean Air Transport Rule. This rule was proposed in 2010 to replace the Clean Air Interstate Rule (CAIR), which had been remanded to the EPA in 2008. The stated purpose of the CSAPR is to limit the interstate transport of emissions of Nitrogen Oxide (NOX) and SO2 that contribute to fine particulate matter and ozone non-attainment in downwind states through a proposed allocation plan. Even with technical revisions to the

*September 2013* 37 *Wisconsin Energy Corporation* rule by the EPA, PIPP may not have been allocated sufficient allowances to meet its obligations to operate and provide stability to the transmission system in the Upper Peninsula of Michigan. This situation could then put the plant at risk for certain penalties under the rule.

The rule was scheduled to become effective January 1, 2012. However, we and a number of other parties sought judicial review of the rule, and in August 2012, the U.S. Court of Appeals for the District of Columbia Circuit vacated the CSAPR, keeping the CAIR in effect. The EPA petitioned the United States Supreme Court, who agreed to hear the case. A decision is expected in mid-2014.

***Climate Change:*** Federal, state, regional and international authorities have undertaken efforts to limit greenhouse gas emissions. The President and his administration recently reaffirmed that regulation of greenhouse gas emissions continues to be a top priority. In June 2013, the President issued a presidential memorandum instructing the EPA to, among other things, issue rules pertaining to greenhouse gas emissions from both new and existing power plants.

The EPA is pursuing regulation of greenhouse gas emissions using its existing authority under the Clean Air Act. On September 20, 2013, the EPA withdrew its 2012 proposed New Source Performance Standards greenhouse gas emissions rule, and issued new proposed rules with greenhouse gas limits for new fossil fueled power plants. The rule does not apply to certain natural gas fueled peaking plants, biomass units or oil fueled stationary combustion turbines.

With respect to existing generating units, the EPA has indicated that it intends to issue a proposed rule in June 2014, a final rule by June 2015 and require State Implementation Plans to be submitted by June 30, 2016. Any such regulations may impact how we operate our existing facilities. Depending on the extent of rate recovery and other factors, these anticipated future rules could have a material adverse impact on our financial condition. For additional information, see the caption "We may face significant costs to comply with the regulation of greenhouse gas emissions." under Item 1A Risk Factors in our 2012 Annual Report on Form 10-K.

***Valley Power Plant Conversion:*** In August 2012, we announced plans to convert the fuel source for Valley Power Plant (VAPP) from coal to natural gas. We currently expect the cost of this conversion to be between $65 million and $70 million excluding AFUDC, and, subject to receipt of PSCW approval and a construction air permit from the WDNR, anticipate that the conversion will be completed by the end of 2015 or early 2016. We filed for a Certificate of Authority from the PSCW on April 26, 2013. The construction air permit for the gas conversion is expected to be issued by the WDNR before the end of the year.

In June 2012, we received approval from the PSCW to replace and upgrade the Lincoln Arthur natural gas main, which has the capability to accommodate the increased natural gas required for the conversion of VAPP to natural gas. Construction began on the Lincoln Arthur natural gas main in March 2013.

### Water Quality

***Steam Electric Effluent Guidelines:*** These guidelines regulate waste water discharges from our power plant processes. In June 2013, the EPA issued a proposed rule for comment to modify these guidelines. We submitted comments primarily addressing potential effects to our wastewater treatment facilities and coal combustion residuals effluent management activities. The rules are expected to be finalized by May 2014. After promulgation of the final rules, the WDNR and MDEQ will need to modify state rules accordingly and then incorporate new requirements into our facility permits. The rule compliance deadline is as soon as possible after July 1, 2017 with full compliance expected by July 1, 2022. We already meet many of the proposed requirements defined by EPA, and as a result believe we will be well positioned to comply with the proposed guidelines. There are several available options outlined in the proposed rule. The amount of additional costs we may need to incur to comply with the new guidelines, if any, will depend on which option(s) the EPA selects to incorporate into the final guidelines. Until the rules are finalized, we are unable to determine the impact on our facilities.

See Factors Affecting Results, Liquidity and Capital Resources -- Environmental Matters in Item 7 of our 2012 Annual Report on Form 10-K for additional information regarding environmental matters affecting our operations.

*September 2013* 38 *Wisconsin Energy Corporation*

### OTHER MATTERS

***Oak Creek Expansion Fuel Flexibility Project:*** The Oak Creek expansion units were designed and permitted to use bituminous coal from the Eastern United States. Market forces have resulted in a significant price differential between bituminous and sub-bituminous coals. We received a new air construction permit from the WDNR to modify the Oak Creek expansion units for potential future use of sub-bituminous coal. In May 2013, we began testing various combinations of sub-bituminous coal and bituminous coal to identify any equipment limitations that should be considered prior to filing with the PSCW for a Certificate of Authority to make any fuel flexibility modifications. In February 2013, the Sierra Club and the Midwest Environmental Defense Center filed a petition for a contested case hearing with the WDNR to challenge the issuance of the air construction permit. The WDNR has granted that petition, but a hearing has not yet been scheduled.

***Paris Generating Station Units 1 and 4 Temporary Outage:*** Between 2000 and 2002, we replaced the blades on the four Paris Generating Station (PSGS) combustion turbine generators with blades that were approximately 7% more efficient. Although the work was performed as routine maintenance that we did not believe required a construction permit at the time and the plant has not been operated to use the potential additional capacity, the WDNR has indicated that it now considers this maintenance to be a modification requiring a construction permit. The WDNR issued a Notice of Violation (NOV) to Wisconsin Electric on January 7, 2013 alleging violations of the new source review rules and certain Wisconsin environmental rules. At the same time, the WDNR also issued an administrative order that prohibits us from operating PSGS Units 1 and 4 until the earlier of: (1) Units 1 and 4 achieve the applicable NOx emission rates; (2) the Wisconsin regulations are revised so that Units 1 and 4 can achieve the emission limits or are no longer subject to the limits; (3) the alleged modification is resolved through a consent decree; or (4) until a court decides that the blade replacement project was not a major modification. We are presently evaluating alternative approaches to return these peaking units to service, and expect that Units 1 and 4 will remain out of service until at least 2014. In addition, we may be subject to fines and penalties. In February 2013, the Sierra Club filed for a contested case hearing with the WDNR in connection with the administrative order. The WDNR has granted that petition, but a hearing has not yet been scheduled. In addition, in May 2013, the WDNR referred the matter to the Wisconsin Department of Justice (DOJ) for alleged violations of air management statutes and rules.

We evaluated the impact that this outage may have on network reliability, and concluded that we will not need to find alternative sources of generation in the short-term to replace the generation from these units during the temporary outage.

PSGS Units 2 and 3 remain available for operation because the turbine blade maintenance on these units occurred prior to a rule change in 2001.

## Market risk

As filed, 657 characters.

There have been no material changes related to market risk from the disclosures presented in our Annual Report on Form 10-K for the year ended December 31, 2012. For information concerning market risk exposures at Wisconsin Energy Corporation, see Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations -- Factors Affecting Results, Liquidity and Capital Resources -- Market Risks and Other Significant Risks, in Part II of our 2012 Annual Report on Form 10-K, as well as Note 5 -- Fair Value Measurements and Note 6 -- Derivative Instruments in the Notes to Consolidated Condensed Financial Statements in this report.

## Controls and procedures

As filed, 1,468 characters.

***Disclosure Controls and Procedures:*** Our management, with the participation of our principal executive officer and principal financial officer, has evaluated the effectiveness of our disclosure controls and procedures (as such term is defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act) as of the end of the period covered by this report. Based upon such evaluation, our principal executive officer and principal financial officer have concluded that, as of the end of such period, our disclosure controls and procedures are effective (i) in recording, processing, summarizing and reporting, on a timely basis, information required to be disclosed by us in the reports that we file or submit under the Exchange Act and (ii) to ensure that information required to be disclosed in the reports that we file or submit under the Exchange Act is accumulated and communicated to our management,

*September 2013* 39 *Wisconsin Energy Corporation* including our principal executive officer and principal financial officer, to allow timely decisions regarding required disclosure.

***Internal Control Over Financial Reporting:*** There has not been any change in our internal control over financial reporting (as such term is defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) during the fiscal quarter to which this report relates that has materially affected, or is reasonably likely to materially affect, our internal control over financial reporting.

## Risk factors

As filed, 3,109 characters.

Other than as set forth below, there have been no material changes from the risk factors presented in our Annual Report on Form 10-K for the year ended December 31, 2012. See Item 1A. Risk Factors in our 2012 Annual Report on Form 10-K for a discussion of certain risk factors applicable to us.

***Restructuring in the regulated energy industry could have a negative impact on our business.***

The regulated energy industry continues to experience significant structural changes. Increased competition in the retail and wholesale markets, which may result from restructuring efforts, could have a significant adverse financial impact on us. It is uncertain whether retail access might be implemented in Wisconsin.

Michigan has adopted retail choice. Under Michigan law, our retail customers may choose an alternative electric supplier to provide power supply service. The law limits customer choice to 10% of our Michigan retail load. The two iron ore mines are excluded from this cap. When a customer switches to an alternative electric supplier, we continue to provide distribution and customer service functions for the customer.

The mines, which we served on an interruptible tariff rate, switched to an alternative electric supplier effective September 1, 2013. In addition, other smaller retail customers have switched to an alternative electric supplier. Sales to these customers, including the mines, totaled 2,173.6 GWh, or 7.6% of our retail electric sales for the year ended December 31, 2012. Previously, the owner of the mines announced that they would shut down the Empire mine by the end of 2014 or beginning of 2015. Before implementation of steps to mitigate the loss of these sales, we estimate that the impact of these losses in 2014 would be approximately $50 million to $54 million before income taxes.

FERC continues to support the existing Regional Transmission Organizations (RTO) that affect the structure of the wholesale market within these RTOs. In connection with its status as a FERC approved RTO, MISO implemented bid-based energy markets that are part of the MISO Energy Markets. The MISO Energy Markets rules require that all market participants submit day-ahead and/or real-time bids and offers for energy at locations across the MISO region. MISO then calculates the most efficient solution for all of the bids and offers made into the market that day and establishes a LMP that reflects the market price for energy. As a participant in the MISO Energy Markets, we are required to follow MISO's instructions when dispatching generating units to support MISO's responsibility for maintaining stability of the transmission system. MISO also implemented an Ancillary Services Market for operating reserves that was simultaneously co-optimized with its existing energy markets.

These market designs have the potential to increase the costs of transmission, the costs associated with inefficient generation dispatching, the costs of participation in the market and the costs associated with estimated payment settlements.

*September 2013* 41 *Wisconsin Energy Corporation*

Filed Nov 1, 2013.
Source: SEC EDGAR, the filing index for accession 0000107815-13-000133. Last ingested by Listed: Nov 24, 2026, 04:24 ET. No prices; not investment advice.