# WEC Energy Group, Inc.: Form 10-Q for the period ended Mar 31, 2014

- Company: [WEC Energy Group, Inc.](/companies/wec.md) (CIK 783325)
- Form: 10-Q
- Filed: 2014-05-02
- Accepted by EDGAR: May 2, 2014, 16:53 ET
- Period: 2014-03-31
- Accession: 0000107815-14-000057
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/783325/000010781514000057/wec0331201410q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/783325/000010781514000057/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2014-03-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2014-01-01 to 2014-03-31 | $1.70bn | us-gaap:Revenues |
| Operating income | 3 months, 2014-01-01 to 2014-03-31 | $381.8m | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2014-01-01 to 2014-03-31 | $62.3m | us-gaap:InterestExpense |
| Income tax | 3 months, 2014-01-01 to 2014-03-31 | $130.3m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2014-01-01 to 2014-03-31 | $207.6m | us-gaap:NetIncomeLoss |
| Diluted shares (weighted) | 3 months, 2014-01-01 to 2014-03-31 | 227,700,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months, 2014-01-01 to 2014-03-31 | $385.1m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 3 months, 2014-01-01 to 2014-03-31 | $129.2m | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Dividends paid | 3 months, 2014-01-01 to 2014-03-31 | $88.1m | us-gaap:PaymentsOfDividendsCommonStock |
| Share repurchases | 3 months, 2014-01-01 to 2014-03-31 | $52.6m | us-gaap:PaymentsForRepurchaseOfCommonStock |
| Cash and equivalents | at 2014-03-31 | $27.6m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2014-03-31 | $1.54bn | us-gaap:AssetsCurrent |
| Total assets | at 2014-03-31 | $14.80bn | us-gaap:Assets |
| Current liabilities | at 2014-03-31 | $1.42bn | us-gaap:LiabilitiesCurrent |
| Long-term debt | at 2014-03-31 | $4.35bn | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2014-03-31 | $343.8m | us-gaap:LongTermDebtCurrent |
| Short-term borrowings | at 2014-03-31 | $422.2m | us-gaap:CommercialPaper |
| Shares outstanding | at 2014-03-31 | 225,519,455 shares | dei:EntityCommonStockSharesOutstanding |

## Management's discussion and analysis

As filed, 46,954 characters.

### AND RESULTS OF OPERATIONS

### RESULTS OF OPERATIONS -- THREE MONTHS ENDED MARCH 31, 2014

### CONSOLIDATED EARNINGS

The following table compares our operating income by business segment and our net income during the first quarter of 2014 with the first quarter of 2013, including favorable (better (B)) or unfavorable (worse (W)) variances:

*(Millions of Dollars, Except Per Share Amounts)*

|  | Three Months Ended March 31 2014 | B (W) | 2013 |
| --- | ---: | ---: | ---: |
| Utility Energy Segment | $292.7 | $62.1 | $230.6 |
| Non-Utility Energy Segment | 90.2 | (1.4) | 91.6 |
| Corporate and Other | (1.1) | 0.1 | (1.2) |
| Total Operating Income | 381.8 | 60.8 | 321.0 |
| Equity in Earnings of Transmission Affiliate | 17.3 | 0.7 | 16.6 |
| Other Income, net | 1.1 | (3.3) | 4.4 |
| Interest Expense, net | 62.3 | 2.7 | 65.0 |
| Income Before Income Taxes | 337.9 | 60.9 | 277.0 |
| Income Tax Expense | 130.3 | (29.9) | 100.4 |
| Net Income | $207.6 | $31.0 | $176.6 |
| Diluted Earnings Per Share | $0.91 | $0.15 | $0.76 |

### UTILITY ENERGY SEGMENT CONTRIBUTION TO OPERATING INCOME

Our utility energy segment contributed $292.7 million of operating income during the first quarter of 2014, an increase of $62.1 million, or 26.9%, compared with the first quarter of 2013. The following table summarizes the operating income of this segment between the comparative quarters:

| Utility Energy Segment Operating Revenues | Three Months Ended March 31 2014 (Millions of Dollars) | B (W) | 2013 |
| --- | ---: | ---: | ---: |
| Electric | $885.8 | $73.5 | $812.3 |
| Gas | 778.0 | 344.0 | 434.0 |
| Other | 18.3 | 3.1 | 15.2 |
| Total Operating Revenues | 1,682.1 | 420.6 | 1,261.5 |
| Operating Expenses |  |  |  |
| Fuel and Purchased Power | 319.9 | (47.6) | 272.3 |
| Cost of Gas Sold | 591.5 | (321.4) | 270.1 |
| Other Operation and Maintenance | 367.6 | 13.0 | 380.6 |
| Depreciation and Amortization | 83.6 | (5.0) | 78.6 |
| Property and Revenue Taxes | 30.3 | (1.0) | 29.3 |
| Total Operating Expenses | 1,392.9 | (362.0) | 1,030.9 |
| Treasury Grant | 3.5 | 3.5 | — |
| Operating Income | $292.7 | $62.1 | $230.6 |

*March 2014* 21 *Wisconsin Energy Corporation*

### Electric Utility Revenues and Sales

The following table compares electric utility operating revenues and MWh sales by customer class during the first quarter of 2014 with the first quarter of 2013:

| Electric Utility Operations Customer Class | Electric Revenues 2014 (Millions of Dollars) | B (W) | 2013 | MWh Sales 2014 (Thousands) | B (W) | 2013 |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Residential | $319.2 | $16.0 | $303.2 | 2,162.6 | 118.1 | 2,044.5 |
| Small Commercial/Industrial | 260.0 | 6.1 | 253.9 | 2,253.2 | 74.2 | 2,179.0 |
| Large Commercial/Industrial | 151.2 | (35.1) | 186.3 | 1,792.9 | (554.9) | 2,347.8 |
| Other - Retail | 6.1 | (0.1) | 6.2 | 39.4 | (0.1) | 39.5 |
| Total Retail | 736.5 | (13.1) | 749.6 | 6,248.1 | (362.7) | 6,610.8 |
| Wholesale - Other | 40.8 | 1.3 | 39.5 | 604.8 | 87.8 | 517.0 |
| Resale - Utilities | 91.8 | 74.5 | 17.3 | 1,443.5 | 883.6 | 559.9 |
| Other Operating Revenues | 15.3 | 9.4 | 5.9 | — | — | — |
| Total | 884.4 | 72.1 | 812.3 | 8,296.4 | 608.7 | 7,687.7 |
| Electric Customer Choice (a) | 1.4 | 1.4 | — | 601.2 | 601.2 | — |
| Total, including electric customer choice | $885.8 | $73.5 | $812.3 |  |  |  |
| Weather -- Degree Days (b) |  |  |  |  |  |  |
| Heating (3,258 Normal) |  |  |  | 4,033 | 562 | 3,471 |
| (a) Represents distribution sales for customers who have purchased power from an alternative electric supplier in Michigan. |  |  |  |  |  |  |
| (b) As measured at Mitchell International Airport in Milwaukee, Wisconsin. Normal degree days are based upon a 20-year |  |  |  |  |  |  |
| moving average. |  |  |  |  |  |  |

Our electric utility operating revenues increased by $73.5 million, or 9.0%, when compared to the first quarter of 2013. The most significant factors that caused a change in revenues were:

- A $74.5 million increase in sales for resale because of increased sales into the MISO Energy Markets as a result of Michigan's alternative electric supplier program and increased availability of our generating units.
- A $33.5 million decrease in large commercial/industrial sales because of the two iron ore mines switching to an alternative electric supplier in September 2013. See Factors Affecting Results, Liquidity and Capital Resources - Electric Transmission and Energy Markets - Restructuring in Michigan, for a discussion of the impact of industry restructuring in Michigan on our electric sales.
- Favorable weather increased electric revenues by an estimated $18.0 million.
- Wisconsin net retail pricing increases of $9.1 million, which are primarily related to our 2013 Wisconsin Rate Case. For information on the the rate order in the 2013 rate case and the 2014 fuel credits, see Factors Affecting Results, Liquidity and Capital Resources -- Utility Rates and Regulatory Matters.
- A $9.4 million increase in other operating revenues, primarily driven by the recognition of $8.7 million related to revenues under the System Support Resource (SSR) agreement with MISO. See Factors Affecting Results, Liquidity and Capital Resources - Electric Transmission and Energy Markets - Restructuring in Michigan, for a discussion of the SSR payments.

As measured by heating degree days, the first quarter of 2014 was 16.2% colder than the same period in 2013 and 23.8% colder than normal. We believe the colder winter weather was the primary reason for the 5.8% increase in residential sales. Sales to large commercial/industrial customers decreased by 23.6%, primarily because of the loss of the two iron ore mines in Michigan as retail electric customers. If the sales to the mines in the first quarter of 2013 are excluded, sales to our large commercial/industrial customers decreased 0.5%.

*March 2014* 22 *Wisconsin Energy Corporation*

### Fuel and Purchased Power

Our fuel and purchased power costs increased by $47.6 million, or 17.5%, when compared to the first quarter of 2013. This increase was primarily caused by a 7.9% increase in total MWh sales and higher generating costs driven by an increase in natural gas prices as compared to the first quarter of 2013.

### Gas Utility Revenues, Gross Margin and Therm Deliveries

A comparison follows of gas utility operating revenues, gross margin and gas deliveries during the first quarter of 2014 with the first quarter of 2013. We believe gross margin is a better performance indicator than revenues because changes in the cost of gas sold flow through to revenue under gas cost recovery mechanisms. Between the comparative periods, total gas operating revenues increased by $344.0 million, or 79.3%. Cost of gas sold increased by $321.4 million, or 119.0%, because of an 18.8% increase in total retail deliveries and an 84.3% increase in the average cost of delivered gas.

|  | Three Months Ended March 31 2014 (Millions of Dollars) | B (W) | 2013 |
| --- | ---: | ---: | ---: |
| Gas Operating Revenues | $778.0 | $344.0 | $434.0 |
| Cost of Gas Sold | 591.5 | (321.4) | 270.1 |
| Gross Margin | $186.5 | $22.6 | $163.9 |

The following table compares gas utility gross margin and natural gas therm deliveries by customer class during the first quarter of 2014 with the first quarter of 2013:

| Gas Utility Operations Customer Class | Gross Margin 2014 (Millions of Dollars) | B (W) | 2013 | Therm Deliveries 2014 (Millions) | B (W) | 2013 |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Residential | $119.6 | $12.0 | $107.6 | 465.6 | 63.3 | 402.3 |
| Commercial/Industrial | 48.0 | 8.5 | 39.5 | 273.5 | 54.1 | 219.4 |
| Interruptible | 0.7 | 0.1 | 0.6 | 7.2 | 0.7 | 6.5 |
| Total Retail | 168.3 | 20.6 | 147.7 | 746.3 | 118.1 | 628.2 |
| Transported Gas | 16.2 | 1.3 | 14.9 | 312.3 | (4.3) | 316.6 |
| Other Operating | 2.0 | 0.7 | 1.3 | — | — | — |
| Total | $186.5 | $22.6 | $163.9 | 1,058.6 | 113.8 | 944.8 |
| Weather -- Degree Days (a) |  |  |  |  |  |  |
| Heating (3,258 Normal) |  |  |  | 4,033 | 562 | 3,471 |
| (a) As measured at Mitchell International Airport in Milwaukee, Wisconsin. Normal degree days are based upon a 20-year |  |  |  |  |  |  |
| moving average. |  |  |  |  |  |  |

Our gas margin increased by $22.6 million, or approximately 13.8%, when compared to the first quarter of 2013, primarily because of the extremely cold winter weather. As measured by heating degree days, the first quarter of 2014 was 16.2% colder than the same period in 2013 and 23.8% colder than normal.

### Other Operation and Maintenance Expense

Our other operation and maintenance expense decreased by $13.0 million, or approximately 3.4%, when compared to the first quarter of 2013. This decrease was primarily driven by lower benefit costs.

*March 2014* 23 *Wisconsin Energy Corporation*

### Depreciation and Amortization Expense

Our depreciation and amortization expense increased by $5.0 million, or approximately 6.4%, when compared to the first quarter of 2013 primarily because of an overall increase in utility plant in service. Our new biomass plant went into service in November 2013.

### Treasury Grant

In December 2013, we filed an application with the United States Treasury for a Section 1603 Renewable Energy Treasury Grant (Treasury Grant) related to the construction of our biomass facility. We recorded a receivable for $82.6 million related to the grant that we expect to receive during 2014. The PSCW anticipated the recognition of this grant as income when it set rates for the two years beginning January 1, 2013. During 2013, we provided bill credits to our Wisconsin electric customers which reflects the grant as income. The bill credits also reflect the tax benefits related to the grant. We are also providing bill credits in 2014.

Treasury Grant income was $3.5 million for the first quarter of 2014 and zero for the same period of 2013. For the first quarter of 2013, we experienced a timing difference between the recognition of bill credits (lower revenues) and grant income. However, when the plant was placed into service in the fourth quarter of 2013, we made an entry to record grant income to match the benefits that had been provided to customers. The grant proceeds that are expected to benefit customers after 2013 are recorded as a regulatory liability.

In addition, the PSCW approved escrow accounting treatment for the Treasury Grant. As a result, we expect to recover any difference between the actual grant proceeds we receive and the estimated grant proceeds used by the PSCW to set electric retail rates for 2013 and 2014.

### NON-UTILITY ENERGY SEGMENT CONTRIBUTION TO OPERATING INCOME

Our non-utility energy segment consists primarily of our PTF units (Port Washington Generating Station Unit 1, Port Washington Generating Station Unit 2, Oak Creek expansion Unit 1 and Oak Creek expansion Unit 2).

This segment primarily reflects the lease revenues on these units as well as the depreciation expense. Operating and maintenance costs associated with the plants are the responsibility of Wisconsin Electric and are recorded in the utility segment.

|  | Three Months Ended March 31 2014 (Millions of Dollars) | B (W) | 2013 |
| --- | ---: | ---: | ---: |
| Operating Revenues | $108.3 | $(1.5) | $109.8 |
| Operation and Maintenance Expense | 1.2 | 0.3 | 1.5 |
| Depreciation Expense | 16.9 | (0.2) | 16.7 |
| Operating Income | $90.2 | $(1.4) | $91.6 |

Non-utility energy segment operating income decreased by $1.4 million, or approximately 1.5%, when compared to the first quarter of 2013. The decrease in operating revenues is primarily related to the one-time entries during 2013 to recognize final approved construction costs for the Oak Creek expansion as part of the 2013 Wisconsin Rate Case.

*March 2014* 24 *Wisconsin Energy Corporation*

### CONSOLIDATED OTHER INCOME, NET

|  | Three Months Ended March 31 2014 (Millions of Dollars) | B (W) | 2013 |
| --- | ---: | ---: | ---: |
| AFUDC - Equity | $1.0 | $(3.3) | $4.3 |
| Other, net | 0.1 | — | 0.1 |
| Other Income, net | $1.1 | $(3.3) | $4.4 |

Other income, net decreased by $3.3 million, or approximately 75.0%, when compared to the first quarter of 2013. The decrease in AFUDC - Equity is primarily related to the biomass plant going into service in November 2013.

### CONSOLIDATED INTEREST EXPENSE, NET

|  | Three Months Ended March 31 2014 (Millions of Dollars) | B (W) | 2013 |
| --- | ---: | ---: | ---: |
| Gross Interest Costs | $62.9 | $4.3 | $67.2 |
| Less: Capitalized Interest | 0.6 | (1.6) | 2.2 |
| Interest Expense, net | $62.3 | $2.7 | $65.0 |

Our gross interest costs decreased by $4.3 million, or approximately 6.4%, when compared to the first quarter of 2013 primarily due to lower debt levels. Our capitalized interest decreased by $1.6 million primarily because of lower construction work in progress as the biomass plant went into service in November 2013. As a result, our net interest expense decreased by $2.7 million, or 4.2%, as compared to the first quarter of 2013.

### CONSOLIDATED INCOME TAX EXPENSE

For the first quarter of 2014, our effective tax rate applicable to continuing operations was 38.6% compared to 36.2% for the first quarter of 2013. This increase in our effective tax rate was primarily due to reduced tax benefits associated with Treasury Grant income and decreased AFUDC - Equity. For additional information, see Note G -- Income Taxes in our 2013 Annual Report on Form 10-K. We expect our 2014 annual effective tax rate to be between 37.5% and 38.5%.

### LIQUIDITY AND CAPITAL RESOURCES

### CASH FLOWS

The following summarizes our cash flows during the three months ended March 31:

| Cash Provided by (Used in) | 2014 (Millions of Dollars) | 2013 |
| --- | ---: | ---: |
| Operating Activities | $385.1 | $330.3 |
| Investing Activities | $(139.1) | $(145.3) |
| Financing Activities | $(244.4) | $(195.9) |

*March 2014* 25 *Wisconsin Energy Corporation*

### Operating Activities

Cash provided by operating activities increased by $54.8 million during the first three months of 2014 as compared to the same period in 2013. The increase is primarily because of higher net income, higher deferred income taxes and higher accounts payable. An increase in natural gas costs caused higher accounts payable when compared to the same period last year. The largest offset to these items is an increase in accounts receivable and accrued revenues as a result of colder weather and the increase in natural gas prices.

### Investing Activities

Cash used in investing activities decreased by $6.2 million during the first three months of 2014 as compared to the same period in 2013. Our capital expenditures decreased by $4.4 million during the first three months of 2014 as compared to the same period in 2013, primarily because of the completion of the biomass plant in November 2013.

### Financing Activities

Cash used in financing activities increased by $48.5 million during the first three months of 2014 as compared to the same period in 2013. During the first three months of 2014, we repaid $37.3 million more short-term debt as compared to the first three months of 2013 because of improved cash flows from operating activities. Our quarterly common stock dividend increased by 12.5% and 2.0% in the third quarter of 2013 and first quarter of 2014, respectively, resulting in an increase of dividends paid on common stock of $10.3 million in the first three months of 2014 as compared to the same period last year. These factors were partially offset by a decrease in repurchases of common stock. During the first three months of 2014, we repurchased $52.6 million of common stock as compared to $66.5 million during during the same period in 2013. See Note 2 -- Common Equity for additional information on share repurchases.

### CAPITAL RESOURCES AND REQUIREMENTS

### Liquidity

We anticipate meeting our capital requirements during the remainder of 2014 and beyond primarily through internally generated funds and short-term borrowings, supplemented by the issuance of intermediate or long-term debt securities, depending on market conditions and other factors.

We currently have access to the capital markets and have been able to generate funds internally and externally to meet our capital requirements. Our ability to attract the necessary financial capital at reasonable terms is critical to our overall strategic plan. We currently believe that we have adequate capacity to fund our operations for the foreseeable future through our existing borrowing arrangements, access to capital markets and internally generated cash.

Wisconsin Energy, Wisconsin Electric and Wisconsin Gas maintain bank back-up credit facilities, which provide liquidity support for each company's obligations with respect to commercial paper and for general corporate purposes.

As of March 31, 2014, we had approximately $1.2 billion of available, undrawn lines under our bank back-up credit facilities, and approximately $422.2 million of commercial paper outstanding on a consolidated basis that was supported by the available lines of credit. During the first three months of 2014, our maximum commercial paper outstanding was $537.4 million with a weighted-average interest rate of 0.18%.

*March 2014* 26 *Wisconsin Energy Corporation*

We review our bank back-up credit facility needs on an ongoing basis and expect to be able to maintain adequate credit facilities to support our operations. The following table summarizes such facilities as of March 31, 2014:

| Company | Total Facility (Millions of Dollars) | Letters of Credit | Credit Available | Facility Expiration |
| --- | ---: | ---: | ---: | --- |
| Wisconsin Energy | $400.0 | $0.1 | $399.9 | December 2017 |
| Wisconsin Electric | $500.0 | $6.1 | $493.9 | December 2017 |
| Wisconsin Gas | $350.0 | $— | $350.0 | December 2017 |

Each of these facilities has a renewal provision for two one-year extensions, subject to lender approval.

The following table shows our capitalization structure as of March 31, 2014, as well as an adjusted capitalization structure that we believe is consistent with the manner in which the rating agencies currently view Wisconsin Energy's 2007 Series A Junior Subordinated notes due 2067 (Junior Notes):

| Capitalization Structure | Actual (Millions of Dollars) | Adjusted |
| --- | ---: | ---: |
| Common Equity | $4,322.0 | $4,572.0 |
| Preferred Stock of Subsidiary | 30.4 | 30.4 |
| Long-Term Debt (including current maturities) | 4,692.6 | 4,442.6 |
| Short-Term Debt | 422.2 | 422.2 |
| Total Capitalization | $9,467.2 | $9,467.2 |
| Total Debt | $5,114.8 | $4,864.8 |
| Ratio of Debt to Total Capitalization | 54.0% | 51.4% |

Included in Long-Term Debt on our Consolidated Condensed Balance Sheet as of March 31, 2014 is $500 million aggregate principal amount of the Junior Notes. The adjusted presentation attributes $250 million of the Junior Notes to Common Equity and $250 million to Long-Term Debt. We believe this presentation is consistent with the 50% or greater equity credit the majority of rating agencies currently attribute to the Junior Notes.

The adjusted presentation of our consolidated capitalization structure is presented as a complement to our capitalization structure presented in accordance with GAAP. Management evaluates and manages Wisconsin Energy's capitalization structure, including its total debt to total capitalization ratio, using the GAAP calculation as adjusted by the rating agency treatment of the Junior Notes. Therefore, we believe the non-GAAP adjusted presentation reflecting this treatment is useful and relevant to investors in understanding how management and the rating agencies evaluate our capitalization structure.

Wisconsin Electric is the obligor under two series of tax exempt pollution control refunding bonds in outstanding principal amounts of $147 million. In August 2009, Wisconsin Electric terminated letters of credit that provided credit and liquidity support for the bonds, which resulted in a mandatory tender of the bonds. Wisconsin Electric issued commercial paper to fund the purchase of the bonds. As of March 31, 2014, the repurchased bonds were still outstanding, but were not reported as long-term debt because they are held by Wisconsin Electric. Depending on market conditions and other factors, Wisconsin Electric may change the method used to determine the interest rate on the bonds and have them remarketed to third parties.

### Credit Rating Risk

Access to capital markets at a reasonable cost is determined in large part by credit quality. Any credit ratings downgrade could impact our ability to access capital markets.

*March 2014* 27 *Wisconsin Energy Corporation*

In January 2014, Moody's raised the ratings of Wisconsin Energy (senior unsecured to A2 from A3; junior subordinated to A3 from Baa1; commercial paper to P-1 from P-2), Wisconsin Electric (senior unsecured to A1 from A2), Wisconsin Gas (senior unsecured to A1 from A2), Elm Road Generating Station Supercritical, LLC (senior notes to A1 from A2) and Wisconsin Energy Capital Corporation (senior unsecured to A2 from A3). The commercial paper ratings of Wisconsin Electric and Wisconsin Gas remained at P-1. Moody's assigned a stable ratings outlook to each company.

Subject to other factors affecting the credit markets as a whole, we believe our current ratings should provide a significant degree of flexibility in obtaining funds on competitive terms. However, these security ratings reflect the views of the rating agencies only. An explanation of the significance of these ratings may be obtained from each rating agency. Such ratings are not a recommendation to buy, sell or hold securities. Any rating can be revised upward or downward or withdrawn at any time by a rating agency.

See Capital Resources and Requirements -- Credit Rating Risk in Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations in our 2013 Annual Report on Form 10-K for additional information related to our credit rating risk.

### Capital Requirements

***Capital Expenditures:*** Capital requirements during the remainder of 2014 are expected to be principally for capital expenditures in our utility operations relating to our electric and gas distribution systems. We estimate that we will spend approximately $711.0 million on consolidated capital expenditures during 2014.

***Common Stock Matters:*** In December 2013, our Board of Directors authorized a share repurchase program for up to $300 million of our common stock from January 1, 2014 through the end of 2017. Funds for the repurchases are expected to come from internally generated funds and working capital supplemented, if required in the short-term, by the sale of commercial paper. The repurchase program does not obligate Wisconsin Energy to acquire any specific number of shares and may be suspended or terminated by the Board of Directors at any time. Through March 31, 2014, we have acquired approximately 0.4 million shares in the open market at a cost of $18.6 million pursuant to this program. For additional information regarding the share repurchases, see Part II, Item 2 - Unregistered Sales of Equity Securities and Use of Proceeds in this report.

In addition, on January 16, 2014, our Board of Directors increased our quarterly common stock dividend to $0.39 per share, up approximately 2.0%, from $0.3825 per share, effective with the first quarter 2014 dividend payment. This equates to an annual dividend of $1.56 per share.

***Off-Balance Sheet Arrangements:*** We are a party to various financial instruments with off-balance sheet risk as a part of our normal course of business, including financial guarantees and letters of credit which support construction projects, commodity contracts and other payment obligations. We believe that these agreements do not have, and are not reasonably likely to have, a current or future effect on our financial condition, changes in financial condition, revenues or expenses, results of operations, liquidity, capital expenditures or capital resources that is material to our investors. For further information, see Note 7 -- Variable Interest Entities in the Notes to Consolidated Condensed Financial Statements in this report.

***Contractual Obligations/Commercial Commitments:*** Our total contractual obligations and other commercial commitments were approximately $21.9 billion as of March 31, 2014 compared with $22.2 billion as of December 31, 2013.

### FACTORS AFFECTING RESULTS, LIQUIDITY AND CAPITAL RESOURCES

The following is a discussion of certain factors that may affect our results of operations, liquidity and capital resources. The following discussion should be read together with the information under the heading "Factors Affecting Results, Liquidity and Capital Resources" in Item 7 of our 2013 Annual Report on Form 10-K, which provides a more complete discussion of factors affecting us, including market risks and other significant risks, our PTF strategy, utility rates and regulatory matters, electric system reliability, environmental matters, legal matters, industry restructuring and competition and other matters.

*March 2014* 28 *Wisconsin Energy Corporation*

### POWER THE FUTURE

All of the PTF units have been placed into service and are positioned to provide a significant portion of our future generation needs.

As part of our 2013 Wisconsin Rate Case, the PSCW determined that 100% of the construction costs for our Oak Creek expansion units were prudently incurred, and approved the recovery in rates of more than 99.5% of these costs. In addition, the PSCW deferred the final decision regarding $24 million related to the Oak Creek expansion fuel flexibility project until a future rate proceeding. See Other Matters below for additional information about the fuel flexibility project.

We Power assigned its warranty rights to Wisconsin Electric upon turnover of each of the Oak Creek expansion units. The warranty claim for costs incurred to repair steam turbine corrosion damage identified on both units was scheduled to go to arbitration in October 2013, but we entered into a settlement agreement with Bechtel Power Corporation (Bechtel) in June 2013 resolving the claim, as well as several other warranty claims. This settlement did not have a material impact to our financial statements. Bechtel and Wisconsin Electric resolved an additional warranty claim in April 2014. The parties continue to work through one remaining item.

See Factors Affecting Results, Liquidity and Capital Resources -- Power the Future in Item 7 of our 2013 Annual Report on Form 10-K for additional information on PTF.

### UTILITY RATES AND REGULATORY MATTERS

***2013 Wisconsin Rate Case:*** In March 2012, Wisconsin Electric and Wisconsin Gas initiated rate proceedings with the PSCW. In December 2012, the PSCW approved the following rate adjustments:

- A net bill increase related to non-fuel costs for Wisconsin Electric's Wisconsin retail electric customers of approximately $70 million (2.6%) for 2013. This amount reflects an offset of approximately $63 million (2.3%) of bill credits related to the proceeds of the Treasury Grant, including related tax benefits. Absent this offset, the retail electric rate increase for non-fuel costs was approximately $133 million (4.8%) for 2013.
- An electric rate increase for Wisconsin Electric's Wisconsin electric customers of approximately $28 million (1.0%) for 2014, and a $45 million (1.6%) reduction in bill credits.
- Recovery of a forecasted increase in fuel costs of approximately $44 million (1.6%) for 2013.
- A rate decrease of approximately $8 million (1.9%) for Wisconsin Electric's natural gas customers for 2013, with no rate adjustment in 2014. The new Wisconsin Electric rates reflect a $6.4 million reduction in bad debt expense.
- A rate decrease of approximately $34 million (5.5%) for Wisconsin Gas' natural gas customers for 2013, with no rate adjustment in 2014. The new Wisconsin Gas rates reflect a $43.8 million reduction in bad debt expense.
- An increase of approximately $1.3 million (6.0%) for Wisconsin Electric's Downtown Milwaukee (Valley) steam utility customers for 2013 and another $1.3 million (6.0%) in 2014.
- An increase of approximately $1 million (7.0%) in 2013 and $1 million (6.0%) in 2014 for Wisconsin Electric's Milwaukee County steam utility customers.

These rate adjustments were effective January 1, 2013. In addition, the PSCW indicated that Wisconsin Electric's and Wisconsin Gas' allowed return on equity would remain at 10.4% and 10.5%, respectively. The PSCW also approved escrow accounting treatment for the Treasury Grant.

Wisconsin Electric and Wisconsin Gas expect to initiate a rate case filing in the second quarter of 2014 for new electric, gas and steam rates to be effective in January 2015.

***2014 Fuel Cost Plan Request:*** In July 2013, Wisconsin Electric filed its 2014 fuel cost plan with the PSCW requesting authority to decrease Wisconsin retail electric customers rates approximately $36 million in the form of a fuel credit primarily related to a reduction in delivered coal costs. The plan was approved by the PSCW on December 20, 2013.

***Gas Cost Recovery Mechanism:*** Our natural gas operations operate under Gas Cost Recovery Mechanisms (GCRMs) as approved by the PSCW. Generally, the GCRMs allow for a dollar for dollar recovery of gas costs. The GCRMs use a modified one for one method that measures commodity purchase costs against a monthly

*March 2014* 29 *Wisconsin Energy Corporation* benchmark which includes a 2% tolerance. Costs in excess of this monthly benchmark are subject to additional review by the PSCW before they can be recovered from our customers.

***Renewable Energy Portfolio:*** Wisconsin Electric constructed a 50 MW biomass facility at Domtar Corporation's Rothschild, Wisconsin paper mill site that went into commercial operation in November 2013. Wood waste and wood shavings are used to produce renewable electricity and will also support Domtar's sustainable papermaking operations. The final cost of completing this project was $269.0 million, excluding AFUDC.

See Factors Affecting Results, Liquidity and Capital Resources -- Utility Rates and Regulatory Matters in Item 7 of our 2013 Annual Report on Form 10-K for additional information regarding our utility rates and other regulatory matters.

### ELECTRIC TRANSMISSION AND ENERGY MARKETS

***Restructuring in Michigan:*** Under Michigan law, our retail customers may choose an alternative electric supplier to provide power supply service. The law limits customer choice to 10% of our Michigan retail load. The two iron ore mines are excluded from this cap. When a customer switches to an alternative electric supplier, we continue to provide distribution and customer service functions for the customer.

The mines, which we served on an interruptible tariff rate, switched to an alternative electric supplier in September 2013. In addition, other smaller retail customers have switched to an alternative electric supplier.

We have taken, and will continue to take, multiple steps to mitigate these impacts. In August 2013, we filed a request with MISO to suspend the operation of all five units at Presque Isle Power Plant (PIPP) located in the Upper Peninsula of Michigan. In October 2013, MISO informed us that the operation of all units is necessary to maintain reliability in the Upper Peninsula of Michigan. On January 30, 2014, we entered into an SSR agreement with MISO to recover costs for operating and maintaining the units. The agreement is effective February 1, 2014, has a one year term, and specifies monthly payments to Wisconsin Electric of $4.4 million to cover fixed costs. The agreement also provides for the payment of our variable costs to operate and maintain the plant. MISO filed the SSR agreement with FERC on January 31, 2014, and on April 1, 2014, FERC conditionally accepted the agreement as filed, subject to further review and FERC order. We expect to begin receiving SSR payments from MISO in the second quarter retroactive to the agreement's effective date of February 1, 2014.

We do not expect the loss of these customers to have a material impact on our consolidated results of operations in 2014. Although the financial impact in future periods is uncertain, we expect that successful mitigation efforts and a reasonable regulatory response should make our net financial exposure immaterial.

In addition, we have been evaluating options for the long-term future of PIPP. As part of that process, we issued a request for proposals regarding the potential purchase of PIPP in January 2014. We did not receive any proposals by the March 3, 2014 deadline. Based upon our evaluation and the lack of interest to purchase the plant, on April 15, 2014, we filed a request with MISO to retire PIPP effective October 15, 2014. MISO will need to determine whether the operation of PIPP is necessary for reliability purposes. We expect that MISO will again find that there are limited alternatives to continued operation of the plant at this point. If MISO determines that we need to continue to operate the plant, we would need to enter into a new SSR agreement with MISO, effective October 15, 2014, that would be expected to cover operations for one year.

See Factors Affecting Results, Liquidity and Capital Resources - Industry Restructuring and Competition in Item 7 of our 2013 Form 10-K for additional information regarding the impact of industry restructuring in Michigan, as well as information regarding other restructuring matters and MISO.

*March 2014* 30 *Wisconsin Energy Corporation*

### ENVIRONMENTAL MATTERS

### Air Quality

### National Ambient Air Quality Standards

***8-hour Ozone Standards:*** In April 2004, the United States Environmental Protection Agency (EPA) designated 10 counties in southeastern Wisconsin as non-attainment areas for the 1997 8-hour ozone ambient air quality standard. The EPA has since redesignated all of these counties to attainment. In 2008, the EPA issued an additional, more stringent 8-hour ozone standard, and made final attainment designations for this revised standard in 2012. In April 2012 and May 2012, the EPA designated Sheboygan County and the eastern portion of Kenosha County, respectively, as 2008 8-hour ozone standard non-attainment areas. The net result of all of these actions is that construction permitting for all of our Wisconsin power plants, except the Pleasant Prairie Power Plant, is expected to be subject to less stringent permitting requirements. In addition, modifications to these facilities should no longer be required to obtain emission offsets. The Pleasant Prairie Power Plant will continue to be subject to more stringent permitting requirements and offset provisions.

In January 2010, the EPA announced its decision to further lower the 2008 8-hour ozone standard. However, in September 2011, President Obama requested the EPA to delay the reconsideration of the 8-hour ozone standard. In January 2014, environmental groups petitioned the U.S. District Court for the Northern District of California to order the EPA to propose a new ozone standard by the end of 2014 and to finalize the standard by October 2015.

***Sulfur Dioxide Standard:*** In June 2010, the EPA issued new hourly Sulfur Dioxide (SO2) National Ambient Air Quality Standards (NAAQS) that became effective in August 2010. This standard represented a significant change from the previous SO2 standard. The implementation guidance for the new standard, among other things, required attainment designations to be based on modeling rather than monitoring. Traditionally, attainment designations were based on monitored data. The EPA has since advised that it is revisiting this implementation guidance. In addition, various parties have submitted judicial and administrative challenges to this rule, and litigation is pending in the U.S. Court of Appeals for the D.C. Circuit challenging, among other things, the stringency of the standards and the EPA's plans to require attainment designations to be based on modeling.

The EPA issued two technical assistance documents for comment in 2013, and on April 17, 2014, released the proposed Data Requirements Rule for the 1-Hour SO2 Primary NAAQS that will establish requirements for characterizing SO2 air quality in priority areas (areas with large sources of SO2 or large populations). The proposed rule describes the EPA's plans for using monitoring and modeling to make designations for areas that have not yet been designated attainment, non-attainment or unclassifiable for the 1-Hour SO2 standard. We have 60 days to submit comments to the EPA following publication of the proposed rule in the Federal Register.

We do not believe that we will need to make any significant additional expenditures at the majority of our generating units because of prior investments in pollution control equipment. We are evaluating the proposed rule to determine if additional controls will be required at PIPP or at our smaller generating units.

***Mercury and Other Hazardous Air Pollutants:*** In December 2011, the EPA issued the final Mercury and Air Toxics Standards (MATS) rule, which imposes stringent limitations on numerous hazardous air pollutants, including mercury, from coal and oil-fired electric generating units. We currently anticipate that only PIPP will require modifications, and are planning for the addition of dry sorbent injection systems for further control of mercury and acid gases at the plant to comply with MATS. In April 2013, we received a one year MATS compliance extension through April 16, 2016 from the Michigan Department of Environmental Quality.

***Cross-State Air Pollution Rule:*** In August 2011, the EPA issued the Cross-State Air Pollution Rule (CSAPR), formerly known as the Clean Air Transport Rule. This rule was proposed in 2010 to replace the Clean Air Interstate Rule (CAIR), which had been remanded to the EPA in 2008. The stated purpose of the CSAPR is to limit the interstate transport of emissions of Nitrogen Oxide (NOX) and SO2 that contribute to fine particulate matter and ozone non-attainment in downwind states through a proposed allocation plan. In February 2012, the EPA issued final technical revisions to the rule and issued a draft final rule which together delay the implementation date for certain penalty provisions that could potentially impact the PIPP and increase the number of allowances issued to the states of Michigan and Wisconsin. We and a number of other parties sought judicial review of the rule. On April 29, 2014, the United States Supreme Court issued a decision largely upholding the rule and remanding it for further proceedings consistent with the Court's order. In light of this decision, we will be re-evaluating the rule and

*March 2014* 31 *Wisconsin Energy Corporation* availability of allowances in Michigan for PIPP to meet its obligations to operate and provide stability to the transmission system in the Upper Peninsula of Michigan. We also expect to have excess allowances available to sell from our Wisconsin power plants.

***Clean Air Visibility Rule:*** The EPA issued the Clean Air Visibility Rule in June 2005 to address Regional Haze, or regionally-impaired visibility caused by multiple sources over a wide area. The rule defines Best Available Retrofit Technology (BART) requirements for electric generating units and how BART will be addressed in the 28 states subject to the EPA's CAIR. The pollutants from power plants that reduce visibility include fine particulate matter or compounds that contribute to fine particulate formation, NOX, SO2 and ammonia.

In June 2012, the EPA promulgated a Federal Implementation Plan that approves reliance on the CSAPR to satisfy electric generating unit BART requirements for NOX and SO2. In December 2012, the EPA approved the remainder of Michigan's regional haze State Implementation Plan (SIP).

In August 2012, the EPA approved Wisconsin's regional haze SIP, which also relies on the CSAPR to satisfy electric generating unit BART requirements for NOX and SO2.

The U.S. Supreme Court decision on April 29, 2014 that upheld the EPA CSAPR allows for the final regional haze rulemaking activities and requirements for NOX and SO2 to proceed. We believe we will be well positioned to meet the Clean Air Visibility rule based on air quality control system additions that are already in place or planned for our generating facilities.

***Valley Power Plant Conversion:*** In August 2012, we announced plans to convert the fuel source for Valley Power Plant (VAPP) from coal to natural gas. We currently expect the cost of this conversion to be between $65 million and $70 million, excluding AFUDC, and anticipate that the conversion will be completed by the end of 2015 or early 2016. We filed for a Certificate of Authority from the PSCW in April 2013, and received final written approval on March 17, 2014.

### Water Quality

***Clean Water Act:*** Section 316(b) of the Clean Water Act requires that the location, design, construction and capacity of cooling water intake structures reflect the Best Technology Available (BTA) for minimizing adverse environmental impacts. The EPA finalized rules for new facilities (Phase I) in 2001. Final rules for cooling water intake systems at existing facilities (Phase II) were promulgated in 2004. However, as a result of litigation, the EPA withdrew the Phase II rule in July 2007 and advised states to use their best professional judgment in making BTA decisions while the rule remains suspended.

The EPA proposed a new Phase II rule in 2011; however, the promulgation of the final rule was delayed and is expected to occur during the second quarter of 2014. Once the rule is final, we expect that it will apply to all of our existing generating facilities with cooling water intake structures other than the Oak Creek expansion, which was permitted under the Phase I rules.

The proposed rule would create an impingement mortality reduction standard for all existing facilities. One proposed approach would allow a facility owner to satisfy the BTA requirement with respect to impingement mortality reduction if it demonstrates that its cooling water intake system has a maximum intake velocity of no more than 0.5 feet per second. Oak Creek Power Plant Units 5-8, Pleasant Prairie and Port Washington Generating Station all employ technologies that have a cooling water intake withdrawal velocity of less than 0.5 feet per second. We are still evaluating impingement mortality reduction compliance options for the PIPP and VAPP.

The EPA has proposed that the BTA for entrainment mortality reduction be determined on a case-by-case basis. Therefore, permitting agencies would be required to determine BTA with respect to entrainment on a site-specific basis taking into consideration several factors. Because the entrainment reduction standard is a site-specific determination, we cannot yet determine what, if any, intake structure or operational modifications will be required to meet this proposed requirement.

Depending on the final requirements of the Phase II rule, we may need to modify the cooling water intake systems at some of our facilities. However, we are not able to make a determination until after the Phase II rule is final.

*March 2014* 32 *Wisconsin Energy Corporation*

See Factors Affecting Results, Liquidity and Capital Resources -- Environmental Matters in Item 7 of our 2013 Annual Report on Form 10-K for additional information regarding environmental matters affecting our operations.

### OTHER MATTERS

***Oak Creek Expansion Fuel Flexibility Project:*** The Oak Creek expansion units were designed and permitted to use bituminous coal from the Eastern United States. Market forces have resulted in a significant price differential between bituminous and sub-bituminous coals. We received a new air construction permit from the WDNR to modify the Oak Creek expansion units for potential future use of sub-bituminous coal. In May 2013, we began testing various combinations of sub-bituminous coal and bituminous coal to identify any equipment limitations that should be considered prior to filing with the PSCW for a Certificate of Authority to make any fuel flexibility modifications. In February 2013, the Sierra Club and the Midwest Environmental Defense Center filed a petition for a contested case hearing with the WDNR to challenge the issuance of the air construction permit. The WDNR has granted that petition, but a hearing has not yet been scheduled.

***Paris Generating Station Units 1 and 4 Temporary Outage:*** Between 2000 and 2002, we replaced the blades on the four Paris Generating Station (PSGS) combustion turbine generators with blades that were approximately 7% more efficient. Although the work was performed as routine maintenance that we did not believe required a construction permit at the time and the plant has not been operated to use the potential additional capacity, the WDNR has indicated that it now considers this maintenance to be a modification requiring a construction permit. The WDNR issued a Notice of Violation (NOV) to Wisconsin Electric in January 2013 alleging violations of the new source review rules and certain Wisconsin environmental rules. At the same time, the WDNR also issued an administrative order that prohibits us from operating PSGS Units 1 and 4 until the earlier of: (1) Units 1 and 4 achieve the applicable NOX emission rates; (2) the Wisconsin regulations are revised so that Units 1 and 4 can achieve the emission limits or are no longer subject to the limits; (3) the alleged modification is resolved through a consent decree; or (4) a court decides that the blade replacement project was not a major modification. We are presently evaluating alternative approaches to return these peaking units to service, and expect Units 1 and 4 to remain out of service until at least the end of the second quarter of 2014. In December 2013, Act 91 was signed into law in Wisconsin, creating a process by which the EPA and WDNR may revise the regulations applicable to Units 1 and 4 and allow those units to restart.

In February 2013, the Sierra Club filed for a contested case hearing with the WDNR in connection with the administrative order. The WDNR has granted that petition, but a hearing has not yet been scheduled. In addition, in May 2013, the WDNR referred the matter to the Wisconsin Department of Justice for alleged violations of air management statutes and rules. We could be subject to fines and penalties.

PSGS Units 2 and 3 remain available for operation because the turbine blade maintenance on these units occurred prior to a rule change in 2001.

## Market risk

As filed, 657 characters.

There have been no material changes related to market risk from the disclosures presented in our Annual Report on Form 10-K for the year ended December 31, 2013. For information concerning market risk exposures at Wisconsin Energy Corporation, see Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations -- Factors Affecting Results, Liquidity and Capital Resources -- Market Risks and Other Significant Risks, in Part II of our 2013 Annual Report on Form 10-K, as well as Note 3 -- Fair Value Measurements and Note 4 -- Derivative Instruments in the Notes to Consolidated Condensed Financial Statements in this report.

## Controls and procedures

As filed, 1,464 characters.

***Disclosure Controls and Procedures:*** Our management, with the participation of our principal executive officer and principal financial officer, has evaluated the effectiveness of our disclosure controls and procedures (as such term is defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act) as of the end of the period covered by this report. Based upon such evaluation, our principal executive officer and principal financial officer have concluded that, as of the end of such period, our disclosure controls and procedures are effective (i) in recording, processing, summarizing and reporting, on a timely basis, information required to be disclosed by us in the reports

*March 2014* 33 *Wisconsin Energy Corporation* that we file or submit under the Exchange Act and (ii) to ensure that information required to be disclosed in the reports that we file or submit under the Exchange Act is accumulated and communicated to our management, including our principal executive officer and principal financial officer, to allow timely decisions regarding required disclosure.

***Internal Control Over Financial Reporting:*** There has not been any change in our internal control over financial reporting (as such term is defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) during the fiscal quarter to which this report relates that has materially affected, or is reasonably likely to materially affect, our internal control over financial reporting.

## Risk factors

As filed, 311 characters.

There have been no material changes from the risk factors presented in our Annual Report on Form 10-K for the year ended December 31, 2013. See Item 1A. Risk Factors in our 2013 Annual Report on Form 10-K for a discussion of certain risk factors applicable to us.

*March 2014* 34 *Wisconsin Energy Corporation*

Filed May 2, 2014.