# Coeur Mining, Inc.: Form 10-Q for the period ended Mar 31, 2012

- Company: [Coeur Mining, Inc.](/companies/cde.md) (CIK 215466)
- Form: 10-Q
- Filed: 2012-05-07
- Accepted by EDGAR: May 7, 2012, 15:36 ET
- Period: 2012-03-31
- Accession: 0000215466-12-000006
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/215466/000021546612000006/cde-03312012xq1.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/215466/000021546612000006/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2012-03-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2012-01-01 to 2012-03-31 | $204.6m | us-gaap:SalesRevenueGoodsNet |
| Cost of revenue | 3 months, 2012-01-01 to 2012-03-31 | $92.6m | us-gaap:CostOfGoodsSold |
| Gross profit | 3 months, 2012-01-01 to 2012-03-31 | $59.4m | us-gaap:GrossProfit |
| Operating income | 3 months, 2012-01-01 to 2012-03-31 | $44.2m | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2012-01-01 to 2012-03-31 | $6.7m | us-gaap:InterestExpense |
| Income tax | 3 months, 2012-01-01 to 2012-03-31 | $15.4m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2012-01-01 to 2012-03-31 | $4.0m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2012-01-01 to 2012-03-31 | $0.04 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2012-01-01 to 2012-03-31 | $0.04 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2012-01-01 to 2012-03-31 | 89,821,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months, 2012-01-01 to 2012-03-31 | $17.0m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 3 months, 2012-01-01 to 2012-03-31 | $31.6m | us-gaap:PaymentsToAcquireProductiveAssets |
| Cash and equivalents | at 2012-03-31 | $151.9m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2012-03-31 | $441.3m | us-gaap:AssetsCurrent |
| Total assets | at 2012-03-31 | $3.23bn | us-gaap:Assets |
| Current liabilities | at 2012-03-31 | $249.0m | us-gaap:LiabilitiesCurrent |
| Current portion of debt | at 2012-03-31 | $80.9m | us-gaap:DebtCurrent |
| Shareholders' equity | at 2012-03-31 | $2.14bn | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 48,900 characters.

Management’s Discussion and Analysis of Financial Condition and Results of Operations (“MD&A”) is designed to provide the reader of the Company's financial statements with a narrative from management’s perspective on its financial condition, results of operations, liquidity and other factors that may affect our future results. The Company believes it is important to read its MD&A in conjunction with its Annual Report on Form 10-K for the year ended December 31, 2011, as well as other publicly available information.

This report contains numerous forward-looking statements relating to the Company’s gold and silver mining business, including estimated production data, expected operating schedules, results of operations, ore reserves and resources, expected capital costs and other operating data and permit and other regulatory approvals. Such forward-looking statements are identified by the use of words such as “believes,” “intends,” “expects,” “hopes,” “may,” “should,” “will,” “plan,” “projected,” “contemplates,” “anticipates” or similar words. Actual production, operating schedules, results of operations, ore reserves and resources, expected capital costs and receipt of permits and regulatory approvals could differ materially from those projected in the forward-looking statements. The important factors that could cause actual results to differ materially from those in the forward-looking statements include: (i) the risk factors set forth below under Part II, Item 1A and under Item 1A (“Risk Factors”) of the Company’s Annual Report on Form 10-K for the year ended December 31, 2011; (ii) risks and hazards inherent in the mining business (including environmental hazards, industrial accidents, weather and geologically related conditions); (iii) changes in the market prices of gold and silver; (iv) uncertainties inherent in the Company’s production, exploratory and developmental activities, including risks relating to permitting and regulatory delays; (v) any future labor disputes or work stoppages; (vi) uncertainties inherent in the estimation of gold and silver ore reserves; (vii) changes resulting from the Company’s future acquisition of new mining properties or businesses; (viii) reliance on third parties to operate certain mines where the Company owns silver production and reserves; (ix) the loss of any third-party smelter to which the Company markets silver and gold; (x) effects of environmental and other governmental regulations; (xi) risks inherent in the ownership or operation of or investment in mining properties or businesses in foreign countries; (xii) the worldwide economic downturn and difficult conditions in the global capital and credit markets; and (xiii) the Company’s possible inability to raise additional financing necessary to conduct its business, make payments or refinance its debt. Readers are cautioned not to put undue reliance on forward-looking statements. The Company disclaims any intent or obligation to update publicly these forward-looking statements, whether as a result of new information, future events or otherwise.

#### Non-U.S. GAAP Measures

We supplement the reporting of our financial information determined under United States generally accepted accounting principles (U.S. GAAP) with certain non-U.S. GAAP financial measures, including cash operating costs and operating cash flow. We believe that these adjusted measures provide meaningful information to assist management, investors and analysts in understanding our financial results and assessing our prospects for future performance. We believe these adjusted financial measures are important indicators of our recurring operations because they exclude items that may not be indicative of, or are unrelated to our core operating results, and provide a better baseline for analyzing trends in our underlying businesses. We believe cash operating costs and operating cash flow are important measures in assessing the Company's overall financial performance.

#### Introduction to the Company

The Company is a large primary silver producer with growing gold production and has assets located in the United States, Mexico, Bolivia, Argentina and Australia. The Palmarejo mine, San Bartolomé mine, Kensington mine, Rochester mine and Martha mine, each of which is operated by the Company, and the Endeavor mine, which is operated by a non-affiliated party, constituted the Company’s principal sources of mining revenues during the first three months of 2012.

The Company’s business strategy is to discover, acquire, develop and operate low-cost silver and gold operations that it expects to produce long-term cash flow, provide opportunities for growth through continued exploration, and generate superior and sustainable returns for shareholders. The Company’s management focuses on maximizing cash flow from its existing operations, the main elements of which are silver and gold prices, cash costs of production and capital expenditures. The Company also focuses on reducing its non-operating costs in order to maximize cash flow.

The results of the Company’s operations are significantly affected by the prices of silver and gold, which may fluctuate widely and are affected by numerous factors beyond the Company’s control, including interest rates, expectations regarding inflation, currency values, governmental decisions regarding the disposal of precious metals stockpiles, global and regional political and economic conditions and other factors. In addition, the Company faces challenges including raising capital, increasing production and managing social, political and environmental issues. Operating costs at its mines are subject to variation due to a number of factors such as changing commodity prices, ore grades, metallurgy, revisions to mine plans and changes in accounting principles. At foreign locations, operating costs are also influenced by currency fluctuations that may affect the Company’s U.S. dollar costs.

### Overview of Performance

### Production

In the first quarter of 2012, the Company’s total silver production increased 19.1% to 4.9 million ounces as compared to 4.1 million ounces in the comparable period in 2011. The increase is primarily due to higher production from Palmarejo and Rochester compared to the same time period in 2011. The Company’s total gold production in the first quarter of 2012 decreased 9,229 ounces, or 17.4%, to 43,901 ounces, as compared to 53,130 ounces in the comparable period in 2011. The decrease was primarily driven by the planned temporary reduction in production at Kensington while the operation focused on other key initiatives.

### Sales of Metal

Sales of metal increased $4.9 million, or 2.5%, to $204.6 million in the first quarter of 2012, compared to $199.6 million in the first quarter of 2011, primarily due to production from the Palmarejo mine and from higher average realized silver and gold prices. The Company’s average realized silver and gold prices during the first quarter of 2012 were $32.61 per ounce and $1,702 per ounce, respectively, representing increases of 4.3% and 23.9% respectively, over last year’s first quarter. Sales of silver contributed 68.1% of the Company’s total metal sales during the first quarter of 2012, compared to 56.4% during the first quarter of 2011.

### Earnings

The Company reported net income of $4.0 million, or $0.04 per share, compared to net income of $12.5 million, or $0.14 per share, for the three months ended March 31, 2012 and 2011, respectively. The earnings reflect non-cash fair value adjustments that decreased net income by $23.1 million and $5.3 million in the three months ended March 31, 2012 and 2011, respectively. These fair value adjustments are driven primarily by higher gold prices which increased the estimated future liabilities related to the Palmarejo gold production royalty obligation.

Production costs increased by $0.1 million or 0.1% for the three months ended March 31, 2012 compared to the same time period in 2011 on a higher sales base.

Depreciation, depletion, and amortization increased by $2.6 million or 5.1% for the three months ended March 31, 2012 compared to the same time period in 2011 as a result of the new leach pad at Rochester being placed into service during the fourth quarter of 2011 as well as increased production at Palmarejo.

Administrative and general expenses decreased by $4.6 million or 37.9% during the three months ended March 31, 2012 compared to the same time period in 2011. The decrease was primarily due to the stock based compensation expense of the Company's former CEO, who retired in the third quarter of 2011.

Exploration expense increased by $3.8 million or 137.8% for the three months ended March 31, 2012 compared to the same time period in 2011 as a result of increased exploration activity at the Palmarejo and Rochester mines, and at the Joaquin project.

Pre-development, care, maintenance and other expenses decreased by $2.5 million or 70.1% during the three months ended March 31, 2012 compared to the same time period in 2011, due to lower expenses at the Rochester mine as a result of the new leach pad being placed into service during the fourth quarter of 2011.

Interest expense decreased $2.6 million or 28.3% during the three months ended March 31, 2012 as compared to the same period in 2011, primarily due to a decrease in total debt outstanding.

### Other Highlights

In addition to the matters discussed above regarding the key elements of the Company’s business strategy, the matters management considers most important in evaluating the Company’s financial condition and results of operations include:

- The average price of silver (Handy & Harman) and gold (London Gold PM) for the three months ended March 31, 2012 was $32.72 and $1,691 per ounce, respectively, compared to $32.00 and $1,386 per ounce, respectively, for the three months ended March 31, 2011. The market price of silver and gold on May 4, 2012 was $30.13 per ounce and $1,644 per ounce, respectively.
- The Company produced a total of 4.9 million ounces of silver during the first quarter of 2012, which was a 19.1% increase over the first quarter of 2011. The Company produced a total of 43,901 ounces of gold during the first quarter of 2012, which was a 17.4% decrease from the first quarter of 2011.
- Net cash provided by operating activities for the first quarter of 2012 was $17.0 million, compared to $35.8 million during the first quarter of 2011 as a result of changes in operating assets and liabilities.
- The Company spent $31.6 million on capital expenditures in the first quarter of 2012, which is $15.7 million higher than

the same time period last year. The majority of the capital expenditures during the three months ended March 31, 2012 were at Palmarejo, San Bartolomé, and Kensington. Palmarejo's expenditures were primarily related to tailings dam construction. The majority of San Bartolomé's expenditures were for new filter presses. Kensington’s capital expenditures were primarily related to construction of a paste backfill plant.

- The Company’s ratio of current assets to current liabilities was 1.77 to 1 at March 31, 2012, compared to 1.84 to 1 at December 31, 2011. The reduction was primarily the result of a tax payment of $41.2 million in Bolivia that reduced its cash and cash equivalents and a reclassification of the 3.25% Convertible Senior Notes from non-current to current liabilities as a result of the holders' option to require the Company to repurchase the notes on March 15, 2013.

### Operating Highlights and Statistics

### Palmarejo Mine:

Production during the first quarter of 2012 was 2.5 million ounces of silver, which represented a 43.5% increase compared to the first quarter of 2011. Gold production was 31,081 ounces which represented a 12.0% increase from the first quarter of 2011. Cash operating costs and total cash costs during the first quarter decreased to $(2.27) per ounce compared to $4.80 for the first quarter of 2011. Production costs applicable to sales for the three months ended March 31, 2012 increased by 22.7% compared to the same time period in 2011 due to the increase in production.

### San Bartolomé Mine:

Silver production for the first quarter of 2012 decreased 7.0% to 1.6 million ounces of silver compared to 1.7 million ounces of silver in the first quarter of 2011. Production costs applicable to sales decreased by 3.6% during the first quarter of 2012 as compared to the first quarter of 2011 due to the decrease in production. Total cash operating costs per ounce during the first quarter of 2012 were $10.21 and total cash costs per ounce, including royalties and taxes, were $11.49 compared to $9.13 and $10.47, respectively, in the first quarter of 2011.

On October 14, 2009, COMIBOL announced by resolution that it was temporarily suspending mining activities above the elevation of 4,400 meters above sea level while stability studies of Cerro Rico mountain are undertaken. The Company holds rights to mine above this elevation under valid contracts backed by Supreme Decree with COMIBOL as well as contracts with local mining cooperatives who hold their rights through COMIBOL. The Company adjusted its mine plan to confine mining activities to the ore deposits below 4,400 meters above sea level and timely notified COMIBOL of the need to lift the restriction. The Company's mine plan was adjusted and mining continued on the remainder of the property. In March 2010, the San Bartolomé mine began mining operations above the 4,400 meter level in high grade material located in the Huacajchi deposit, which was confirmed to be excluded from the October 2009 resolution, under an agreement with the Cooperative Reserva Fiscal. In December 2011, a further area in the deposit known as Huacajchi Sur was confirmed to be open for mining as well. Other mining areas above the 4,400 meter level continue to be suspended. The Company does not use explosives in its surface-only mining activities and is sensitive to the preservation of the mountain under its contracts with the state-owned mining entity and the local cooperatives.

### Kensington Mine:

The Kensington mine is an underground gold mine that commenced commercial production on July 3, 2010. Production for the first quarter of 2012 was 7,444 ounces of gold, as compared to 23,676 ounces of gold for the same time period of 2011. Total cash operating costs per ounce in the first quarter of 2012 were $2,709 as compared to $989 for the same time period during 2011. In December of 2011, Kensington entered an expected six month period where processing levels were reduced by 50% to approximately 700 tons per day. This was intended to allow the mine to implement and complete several key initiatives, including:

- Accelerated underground development, resulting in greater operational flexibility and efficiency
- In-fill drilling program to better define the high-grade ore zones and convert existing resources into proven and probable reserves
- Completion and commissioning of the underground paste backfill plant and related distribution system, providing access to ore in previously mined areas
- Construction of several underground and surface projects

On April 26, 2012, the Company announced that Kensington has resumed full production.

### Rochester Mine:

Production was 0.4 million ounces of silver and 5,292 ounces of gold during the first quarter of 2012 compared to 0.3 million ounces of silver and 1,451 ounces of gold in the first quarter of 2011. Production costs applicable to sales increased to $9.6 million during the first quarter of 2012, as compared to $7.4 million during the same time period in 2011 due to the increase in production. Total cash operating costs per ounce in the first quarter of 2012 were $23.35 and total cash costs per ounce, including production taxes, were $24.75 in the first quarter of 2012 as compared to total cash operating costs per ounce of $10.28 and total cash costs per ounce of $11.86 in the first quarter of 2011.

In 2008, the Company commenced studies to investigate the potential to recommence mining and leaching of new material and in 2009 and 2010 completed feasibility studies demonstrating the viability of an expansion of mining and leaching operations at the mine through 2017. The Company prepared an Amended Plan of Operations for resumption of mining within the existing and permitted Rochester pit and construction of an additional heap leach pad, all within the currently permitted mine boundary. The Bureau of Land Management (BLM) deemed this plan complete in August 2009 under federal regulations and initiated the National Environmental Policy Act process. The BLM issued a positive Decision Record (DR) for the mine to extend silver and gold mining operations by several years. The Company began to recover new production ounces in the fourth quarter of 2011.

### Martha Mine:

Silver production at the Martha mine was 0.1 million ounces in the first quarter of 2012 compared to 0.2 million ounces in the first quarter of 2011. Total cash operating costs per ounce in the first quarter of 2012 were $46.48 and total cash costs per ounce, including royalties and taxes, were $47.15, as compared to $24.44 and $25.46, respectively, during the first quarter of 2011. The decrease in silver production for the quarter was primarily due to a decrease in ore grade as the mine transitions to higher grade areas in development.

### Endeavor Mine:

Silver production at the Endeavor mine in the first quarter of 2012 was 0.2 million ounces compared to 0.1 million ounces in the first quarter of 2011. Production costs applicable to sales were $2.7 million for the quarter compared to $1.1 million in the first quarter of 2011. Total cash costs per ounce of silver produced were $16.64 in the first quarter of 2012 compared to $17.15 in the first quarter of 2011. The decrease in total cash costs per ounce was primarily due to the price participation component terms of the silver purchase agreement with CBH Resources Ltd. Under the terms of the price participation component, CDE Australia Pty. Ltd a subsidiary of the Company, pays an additional operating cost contribution of 50% of the amount by which the silver price exceeds $7.00 per ounce.

As of March 31, 2012, CDE Australia Pty Ltd had recovered approximately 89.4% of the transaction consideration consisting of 3.8 million payable ounces, or 18.8% of the 20.0 million maximum payable silver ounces to which CDE Australia Pty Ltd is entitled under the terms of the silver sale and purchase agreement.

### Operating Statistics from Continuing Operations

The following table presents information by mine and consolidated sales information for the three month periods ended March 31, 2012 and 2011:

| Silver Operations: Palmarejo | Three months ended March 31, 2012 | 2011 |
| --- | ---: | ---: |
| Tons milled | 528,543 | 398,740 |
| Ore grade/Ag oz | 6.12 | 5.97 |
| Ore grade/Au oz | 0.06 | 0.08 |
| Recovery/Ag oz | 76.8% | 72.7% |
| Recovery/Au oz | 93.3% | 87.4% |
| Silver production ounces | 2,482,814 | 1,729,766 |
| Gold production ounces | 31,081 | 27,759 |
| Cash operating cost/oz | $(2.27) | $4.80 |
| Cash cost/oz | $(2.27) | $4.80 |
| Total production cost/oz | $13.04 | $24.40 |
| **San Bartolomé** |  |  |
| Tons milled | 378,104 | 387,668 |
| Ore grade/Ag oz | 4.62 | 5.60 |
| Recovery/Ag oz | 91.2% | 88.6% |
| Silver production ounces | 1,591,292 | 1,710,948 |
| Cash operating cost/oz | $10.21 | $9.13 |
| Cash cost/oz | $11.49 | $10.47 |
| Total production cost/oz | $14.02 | $13.37 |
| **Martha** |  |  |
| Tons milled | 34,069 | 17,818 |
| Ore grade/Ag oz | 4.43 | 12.06 |
| Ore grade/Au oz | — | 0.02 |
| Recovery/Ag oz | 81.4% | 83.7% |
| Recovery/Au oz | 64.6% | 75.3% |
| Silver production ounces | 122,793 | 179,985 |
| Gold production ounces | 84 | 244 |
| Cash operating cost/oz | $46.48 | $24.44 |
| Cash cost/oz | $47.15 | $25.46 |
| Total production cost/oz | $51.85 | $29.28 |
| Rochester (A) |  |  |
| Tons milled | 2,009,518 | — |
| Ore grade/Ag oz | 0.55 | — |
| Ore grade/Au oz | 0.004 | — |
| Recovery/Ag oz | 40.2% | — |
| Recovery/Au oz | 62.1% | — |
| Silver production ounces | 441,337 | 333,696 |
| Gold production ounces | 5,292 | 1,451 |
| Cash operating cost/oz | $23.35 | $10.28 |
| Cash cost/oz | $24.75 | $11.86 |
| Total production cost/oz | $28.67 | $13.53 |

29

| Endeavor | Three months ended March 31, 2012 | 2011 |
| --- | ---: | ---: |
| Tons milled | 195,846 | 167,287 |
| Ore grade/Ag oz | 3.35 | 2.00 |
| Recovery/Ag oz | 37.8% | 44.5% |
| Silver production ounces | 247,958 | 149,182 |
| Cash operating cost/oz | $16.64 | $17.15 |
| Cash cost/oz | $16.64 | $17.15 |
| Total production cost/oz | $23.27 | $21.30 |
| **Gold Operation:** |  |  |
| Kensington(B) |  |  |
| Tons milled | 43,936 | 105,820 |
| Ore grade/Au oz | 0.18 | 0.24 |
| Recovery/Au oz | 93.4% | 92.4% |
| Gold production ounces | 7,444 | 23,676 |
| Cash operating cost/oz | $2,709 | $989 |
| Cash cost/oz | $2,709 | $989 |
| Total production cost/oz | $3,598 | $1,384 |
| **CONSOLIDATED PRODUCTION TOTALS (B)** |  |  |
| Total silver ounces | 4,886,194 | 4,103,577 |
| Total gold ounces | 43,901 | 53,130 |
| **Silver Operations:(C)** |  |  |
| Cash operating cost per oz - silver | $6.29 | $8.36 |
| Cash cost per oz - silver | $6.85 | $9.10 |
| Total production cost oz - silver | $16.26 | $19.02 |
| **Gold Operation:(D)** |  |  |
| Cash operating cost per oz - gold | $2,709 | $989 |
| Cash cost per oz - gold | $2,709 | $989 |
| Total production cost per oz - gold | $3,598 | $1,384 |
| CONSOLIDATED SALES TOTALS (E) |  |  |
| Silver ounces sold | 4,290,049 | 3,659,154 |
| Gold ounces sold | 38,884 | 65,948 |
| Realized price per silver ounce | $32.61 | $31.27 |
| Realized price per gold ounce | $1,702 | $1,374 |

(A) The Rochester mine recommenced production in the fourth quarter of 2011. The leach cycle at Rochester requires five to ten years to recover gold and silver contained in the ore. The Company estimates the ultimate recovery to be approximately 61% for silver and 92% for gold. However, ultimate recoveries will not be known until leaching operations cease, which is currently estimated for 2017. Current recovery may vary significantly from ultimate recovery. See Critical Accounting Policies and Estimates – Ore on Leach Pad in the Company’s Form 10-K for the year ended December 31, 2011.

(B) Current production ounces and recoveries reflect final metal settlements of previously reported production ounces.

(C) Amount includes by-product gold credits deducted in computing cash costs per ounce.

(D) Amounts reflect Kensington per ounce statistics only.

(E) Units sold at realized metal prices will not match reported metal sales due primarily to the effects on revenues of mark-to-market adjustments on embedded derivatives in the Company’s provisionally priced sales contracts.

“Operating Costs per Ounce” and “Cash Costs per Ounce” are calculated by dividing the operating cash costs and cash costs computed for each of the Company’s mining properties for a specified period by the amount of gold ounces or silver ounces produced by that property during that same period. Management uses cash operating costs per ounce and cash costs per ounce as key indicators of the profitability of each of its mining properties. Gold and silver are sold and priced in the world financial markets on a U.S. dollar per ounce basis.

“Cash Operating Costs” and “Cash Costs” are costs directly related to the physical activities of producing silver and gold, and include mining, processing and other plant costs, third-party refining and smelting costs, marketing expenses, on-site general and administrative costs, royalties, in-mine drilling expenditures related to production and other direct costs. Produced by-product metal unit at the average market price is deducted from the above in computing cash costs. Cash costs exclude depreciation, depletion and amortization, accretion, corporate general and administrative expenses, exploration, interest, and pre-feasibility costs. Cash operating costs include all cash costs except production taxes and royalties, if applicable. Cash costs are calculated and presented using the “Gold Institute Production Cost Standard” applied consistently for all periods presented.

Total operating costs and cash costs per ounce are non-U.S. GAAP measures and investors are cautioned not to place undue reliance on them and are urged to read all U.S. GAAP accounting disclosures presented in the consolidated financial statements and accompanying footnotes. In addition, see the reconciliation of “cash costs” to production costs under “Reconciliation of Non-U.S. GAAP Cash Costs to U.S. GAAP Production Costs” set forth below. We supplement the reporting of our financial information determined under United States generally accepted accounting principles (U.S. GAAP) with certain non-U.S. GAAP financial measures, including cash operating costs and operating cash flow. We believe that these adjusted measures provide meaningful information to assist management, investors and analysts in understanding our financial results and assessing our prospects for future performance. We believe these adjusted financial measures are important indicators of our recurring operations because they exclude items that may not be indicative of, or are unrelated to our core operating results, and provide a better baseline for analyzing trends in our underlying businesses. We believe cash operating costs and operating cash flow are important measures in assessing the Company's overall financial performance.

The following tables present a reconciliation between non-U.S. GAAP cash operating costs per ounce and cash costs per ounce to production costs applicable to sales including depreciation, depletion and amortization, which are calculated in accordance with U.S. GAAP:

*Reconciliation of Non-U.S. GAAP Cash Costs to U.S. GAAP Production Costs Three months ended March 31, 2012*

*(In thousands except ounces and per ounce costs)*

|  | Palmarejo | San Bartolomé | Kensington | Rochester | Martha | Endeavor | Total |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Total cash operating cost (Non-U.S. GAAP) | $(5,643) | $16,253 | $20,168 | $10,303 | $5,708 | $4,127 | $50,916 |
| Royalties | — | 2,036 | — | 609 | 82 | — | 2,727 |
| Production taxes | — | — | — | 12 | — | — | 12 |
| Total cash costs (Non-U.S. GAAP) | $(5,643) | $18,289 | $20,168 | $10,924 | $5,790 | $4,127 | $53,655 |
| Add/Subtract: |  |  |  |  |  |  |  |
| Third party smelting costs | — | — | (1,083) | — | (1,975) | (788) | (3,846) |
| By-product credit | 52,526 | — | — | 8,957 | 141 | — | 61,624 |
| Other adjustments | 244 | (194) | 7 | 87 | 57 | — | 201 |
| Change in inventory | (1,268) | (4,487) | (2,001) | (10,403) | (320) | (601) | (19,080) |
| Depreciation, depletion and amortization | 37,761 | 4,219 | 6,604 | 1,642 | 520 | 1,644 | 52,390 |
| Production costs applicable to sales, including depreciation, depletion and amortization (U.S. GAAP) | $83,620 | $17,827 | $23,695 | $11,207 | $4,213 | $4,382 | $144,944 |
| Production of silver (ounces) | 2,482,814 | 1,591,292 | — | 441,337 | 122,793 | 247,958 | 4,886,194 |
| Cash operating cost per silver ounce | $(2.27) | $10.21 | $— | $23.35 | $46.48 | $16.64 | $6.29 |
| Cash costs per silver ounce | $(2.27) | $11.49 | $— | $24.75 | $47.15 | $16.64 | $6.85 |
| Production of gold (ounces) | — | — | 7,444 | — | — | — | 7,444 |
| Cash operating cost per gold ounce | $— | $— | $2,709 | $— | $— | $— | $2,709 |
| Cash cost per gold ounce | $— | $— | $2,709 | $— | $— | $— | $2,709 |

31

*Three months ended March 31, 2011*

*(In thousands except ounces and per ounce costs)*

|  | Palmarejo | San Bartolomé | Kensington | Rochester | Martha | Endeavor | Total |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Total cash operating cost (Non-U.S. GAAP) | $8,311 | $15,615 | $23,410 | $3,429 | $4,399 | $2,558 | $57,722 |
| Royalties | — | 2,304 | — | 330 | 183 | — | 2,817 |
| Production taxes | — | — | — | 200 | — | — | 200 |
| Total cash costs (Non-U.S. GAAP) | $8,311 | $17,919 | $23,410 | $3,959 | $4,582 | $2,558 | $60,739 |
| Add/Subtract: |  |  |  |  |  |  |  |
| Third party smelting costs | — | — | (2,650) | — | (1,373) | (563) | (4,586) |
| By-product credit | 38,468 | — | — | 2,015 | 339 | — | 40,822 |
| Other adjustments | 221 | (189) | — | 42 | 96 | — | 170 |
| Change in inventory | (9,631) | (3,612) | 12,160 | 1,341 | (4,034) | (895) | (4,671) |
| Depreciation, depletion and amortization | 33,666 | 5,143 | 9,365 | 514 | 591 | 619 | 49,898 |
| Production costs applicable to sales, including depreciation, depletion and amortization (U.S. GAAP) | $71,035 | $19,261 | $42,285 | $7,871 | $201 | $1,719 | $142,372 |
| Production of silver (ounces) | 1,729,766 | 1,710,948 | — | 333,696 | 179,985 | 149,182 | 4,103,577 |
| Cash operating cost per silver ounce | $4.80 | $9.13 | $— | $10.28 | $24.44 | $17.15 | $8.36 |
| Cash costs per silver ounce | $4.80 | $10.47 | $— | $11.86 | $25.46 | $17.15 | $9.10 |
| Production of gold (ounces) | — | — | 23,676 | — | — | — | 23,676 |
| Cash operating cost per gold ounce | $— | $— | $989 | $— | $— | $— | $989 |
| Cash cost per gold ounce | $— | $— | $989 | $— | $— | $— | $989 |

### Exploration Activity

During the three months ending March 31, 2012, the Company completed 67,671 meters (222,016 feet) of new core and reverse circulation drilling and trenching in its global exploration program. The majority of this drilling was devoted to the Company's Palmarejo (Mexico) property followed by Joaquin (Argentina), Rochester (Nevada), Kensington (Alaska) and San Bartolomé (Bolivia). At peak, up to 16 drills were employed company-wide during the first quarter. The Company plans to spend $39.9 million in exploration during 2012 with approximately 84% of the budget earmarked for its existing operations at San Bartolomé, Martha and Joaquin, Palmarejo, Kensington and Rochester. In the second quarter, exploration and definition drilling will focus on many of the same areas and targets.

### Palmarejo (Mexico)

The Company completed 37,186 meters (122,001 feet) of exploration core drilling in the first quarter in the Palmarejo District. This drilling was split nearly evenly between targets around the current Palmarejo mine from both surface and underground drill platforms, specifically the Rosario, Tucson and Chapotillo zones, and at Guadalupe and other targets including La Patria, Independencia and Guerra al Tirano. Guadalupe and Palmarejo will receive the bulk of drilling in the second quarter of this year.

### Martha and Joaquin (Argentina)

A total of 14,342 meters (47,021 feet) of drilling was completed in the Santa Cruz Province of southern Argentina in the first quarter of 2012. Over 92% of this drilling was completed at the Joaquin joint venture property, with a focus on expanding and increasing the confidence of mineralization at the La Morocha and La Negra deposits and drilling to collect new samples for metallurgy tests. The Company plans to continue drilling to define the two deposits at Joaquin and to work toward completion of a feasibility study, which would increase the Company's managing and participating interest in the Joaquin project from 51% to 61%. Subject to certain conditions the Company has an option to increase its interest further. The Joaquin project is located approximately 70 kilometers (43 miles) by road north of the Martha mine. Other targets drilled in the quarter in Argentina were at the Martha mine.

### Rochester (USA)

Drilling at Rochester continued at the pace set in the second half of 2011. A total of 12,634 meters (41,450 feet) of reverse circulation drilling were completed on the property. In addition, drilling of surface stockpiles commenced in the quarter.

### Kensington (USA)

Exploration at Kensington consisted of just over 3,014 meters (9,887 feet) of core drilling in the quarter. Nearly all of the drilling was devoted to the Raven vein zone which is located approximately 685 meters (2,250 feet) due west of the Kensington ore body. In addition, drilling recommenced on the new Kensington South target. This target is immediately south of the Kensington ore body, on trend, and has seen very little historic exploration.

In addition to this exploration drilling, up to 3 drills were employed this quarter to further define the lower part of Zone 10. The Company completed 6,211 meters (20,377 feet) of definition drilling on a nominal 15 meter spacing (50 feet). Zone 10 will form the bulk of mining for the next 3 years.

### San Bartolomé (Bolivia)

For the quarter ended March 31, 2012, 87 new backhoe trenches were completed and sampled, resulting in 505 new meters of trenching and sampling on one-meter vertical intervals. Most of this work was centered on the Santa Rita area with a smaller amount at Diablo.

### Critical Accounting Policies and Estimates

**Use of Estimates:** The preparation of the Company’s consolidated financial statements in conformity with U.S. GAAP requires management to make estimates and assumptions that affect the amounts reported in their consolidated financial statements and accompanying notes. The areas requiring significant management estimates and assumptions relate to: recoverable ounces from proven and probable reserves that are the basis of future cash flow estimates and units-of-production depreciation and amortization calculations; useful lives utilized for depreciation, depletion and amortization; estimates of future cash flows for long-lived assets; estimates of recoverable gold and silver ounces in ore on leach pad; amount and timing of reclamation and remediation costs; valuation allowance for deferred tax assets; assessment of valuation allowance for value added tax receivables; and other employee benefit liabilities.

Please see Note 2 – Summary of Significant Accounting Policies for additional critical accounting policies and estimates.

### RESULTS OF OPERATIONS

### Three Months Ended March 31, 2012 Compared to Three Months Ended March 31, 2011

Sales of metal from continuing operations in the first quarter of 2012 increased by 2.5% to $204.6 million from $199.6 million in the first quarter of 2011. The increase in sales of metal was due to an increase in silver ounces sold as well as an increase in realized prices. In the first quarter of 2012, the Company sold 4.3 million ounces of silver and 38,884 ounces of gold compared to 3.7 million ounces of silver and 65,948 ounces of gold for the same period in 2011. Realized silver and gold prices in the first quarter of 2012 increased 4.3% and 23.9%, respectively, over the first quarter 2011. Realized silver and gold prices were $32.61 and $1,702 per ounce, respectively, in the first quarter of 2012, compared to $31.27 and $1,374 per ounce, respectively, in the comparable quarter of 2011.

Included in sales of metals are the by-product sales derived from the sale of gold by the Company's silver mines. Total gold sales for the periods ended March 31, 2012 and 2011 were $65.3 million and $87.1 million, respectively. Of those totals, by-product metal sales were $54.9 million compared to $39.0 million, respectively. The Company believes that presentation of these metal sales as a by-product from its silver operations will continue to be appropriate in the future. The increases in by-product sales were primarily due to the increase in gold prices.

In the first quarter of 2012, the Company produced a total of 4.9 million ounces of silver and 43,901 ounces of gold, compared to 4.1 million ounces of silver and 53,130 ounces of gold in the first quarter of 2011.

While quarterly sales of metal rose 2.5%, production costs applicable to sales of metal in the first quarter of 2012 increased slightly from $92.5 million in the first quarter of 2011 to $92.6 million in the first quarter of 2012. The increase in sales is primarily due to the increases in production at Palmarejo and Rochester and an increase in metal prices.

Depreciation, depletion, and amortization increased by $2.6 million, from $50.0 million to $52.6 million, compared to the first quarter of 2011. The increase is due to depreciation and depletion expense from the Rochester mine, which commenced commercial production on the new leach pad in the fourth quarter of 2011 as well as increased production at Palmarejo.

#### Costs and Expenses

Administrative and general expenses decreased by $4.6 million, from $12.2 million to $7.6 million, as compared to the first quarter of 2011. The decrease was primarily caused by the stock based compensation expense of the Company's former CEO, who retired in the third quarter of 2011.

Exploration expenses increased to $6.6 million in the first quarter of 2012 compared to $2.8 million in the same period of 2011 primarily due to increased exploration activity at the Palmarejo, Rochester, and Martha mines.

#### Other Income and Expenses

Non-cash fair value adjustments, net in the three months ended March 31, 2012 were a loss of $23.1 million compared to a loss of $5.3 million in the first quarter of 2011. The majority of the increase in the fair value adjustment, net was due to the impact of higher gold prices on the Palmarejo gold production royalty obligation.

Interest income and other increased by $3.1 million to $5.0 million in the first quarter of 2012 compared with $1.9 million in the first quarter of 2011. The increase was primarily due to foreign currency transactions in Mexico.

Interest expense, net of capitalized interest, decreased to $6.7 million in the first quarter of 2012 from $9.3 million in the first quarter of 2011. The decrease in interest expense was primarily due to a decrease in total debt and capital leases outstanding.

#### Income Taxes

For the three months ended March 31, 2012, the Company reported an income tax provision of approximately $15.4 million compared to an income tax provision of $12.9 million in the first quarter of 2011.

The following table summarizes the components of the Company’s income tax provision for the three months ended March 31, 2012 and 2011 (in thousands):

| Current: | Three months ended March 31, 2012 | 2011 |
| --- | ---: | ---: |
| United States - Alternative minimum tax | $— | $1,938 |
| United States - Foreign withholding | (17) | (78) |
| Argentina | (201) | 98 |
| Australia | (371) | 101 |
| Mexico | (154) | (50) |
| Bolivia | (7,015) | (9,079) |
| Deferred: |  |  |
| United States | (3,120) | (616) |
| Australia | (340) | (519) |
| Mexico | (3,544) | (3,776) |
| Bolivia | (674) | (958) |
| Income tax provision | $(15,436) | $(12,939) |

During the three months ended March 31, 2012, the Company recognized a current provision in Bolivia, Mexico and Australia primarily related to higher metal prices and inflation adjustments on non-monetary assets. In addition, the Company recognized a net $7.7 million deferred tax provision for the recognition of deferred taxes on deductible temporary differences, foreign exchange rate adjustments and net operating loss carryforwards in various jurisdictions (principally in Bolivia and Mexico).

During the three months ended March 31, 2011, the Company recognized a current provision in Bolivia primarily related to higher metal prices and inflationary adjustments on non-monetary assets. Further, the Company accrued foreign withholding taxes of approximately $0.1 million on inter-company transactions between the U.S. parent and subsidiaries operating in Mexico, Argentina and Australia, and a $2.0 million benefit for anticipated operating losses in the U.S. In addition, the Company recognized a net $5.9 million deferred tax provision for the recognition of deferred taxes on deductible temporary differences, foreign exchange rate adjustments and net operating loss carryforwards in various jurisdictions (principally in Bolivia and Mexico).

#### LIQUIDITY AND CAPITAL RESOURCES

### Liquidity

#### Working Capital; Cash and Cash Equivalents

As of March 31, 2012, the Company’s cash, cash equivalents and short term investments totaled $153.2 million compared to $195.3 million as of December 31, 2011. The decrease was primarily attributed to payment of income taxes in Bolivia.

The Company’s working capital decreased by $20.6 million between December 31, 2011 and March 31, 2012 to $192.3 million, compared to $212.9 million at December 31, 2011. The ratio of current assets to current liabilities was 1.77 to 1 at March 31, 2012 and was 1.84 to 1 at December 31, 2011. The decrease was primarily attributable to the $46.2 million reclassification of the 3.25% Convertible Senior Notes due March 2028 from non-current to current liabilities as a result of the holders' option to require the Company to repurchase the notes on March 15, 2013.

The Company intends to indefinitely reinvest a portion of its earnings from its Palmarejo operations in Mexico. Accordingly, U.S. and non-U.S. income and withholding taxes for which deferred taxes might otherwise be required, have not been provided on a cumulative amount of temporary differences (including, for this purpose, any difference between the tax basis in the stock of a consolidated subsidiary and the amount of the subsidiary’s net equity determined for financial reporting purposes) related to investments in foreign subsidiaries of approximately $170.0 million for the three months ended March 31, 2012 and the year ended December 31, 2011. The additional U.S. and non-U.S. income and withholding tax that would arise on the reversal of the temporary differences could be offset in part, by tax credits. Because the determination of the amount of available tax credits and the limitations imposed on the annual utilization of such credits are subject to a highly complex series of calculations and expense allocations, it is impractical to estimate the amount of net income and withholding tax that might be payable if a reversal of temporary differences occurred. The Company does not believe that the amounts permanently reinvested will have a material impact on liquidity.

### Cash Provided by Operating Activities

Net cash provided by operating activities in the three months ended March 31, 2012 was $17.0 million, compared with $35.8 million for the same time period in 2011. The decrease is primarily the result of changes in operating assets and liabilities. Excluding changes in operating assets and liabilities, the Company’s operating cash flow consisted of the following:

*(In thousands)*

|  | Three months ended March 31, 2012 | 2011 |
| --- | ---: | ---: |
| CASH PROVIDED BY OPERATING ACTIVITIES | $17,002 | $35,786 |
| Changes in operating assets and liabilities: |  |  |
| Receivables and other current assets | 2,956 | 4,841 |
| Prepaid expenses and other | (4,774) | 19 |
| Inventories | 24,722 | 12,493 |
| Accounts payable and accrued liabilities | 53,929 | 36,977 |
| Operating cash flow | $93,835 | $90,116 |

### Cash Used in Investing Activities

Net cash used in investing activities in the three months ended March 31, 2012 was $12.5 million, compared to $16.6 million in the three months ended March 31, 2011. The decrease is primarily due to proceeds from sales and maturities of investments offset by increased capital expenditures.

The Company spent $31.6 million on capital expenditures in the first quarter of 2012, compared with $15.9 million during the same time period last year. The majority of the capital expenditures for the first three months of 2012 were at Palmarejo, San Bartolomé, and Kensington.

### Cash Used in Financing Activities

Net cash used in financing activities during the three months ended March 31, 2012 was $27.7 million compared to $20.9 million for the same time period last year. During the three months ended March 31, 2012, the Company paid $26.5 million to reduce existing debt and royalty obligations, primarily the Palmarejo gold production royalty. During the three months ended March 31, 2011, the Company borrowed $27.5 million and paid $47.0 million to reduce existing debt.

#### Debt and Capital Resources

### 3.25% Convertible Senior Notes due 2028

As of March 31, 2012, the outstanding balance of the 3.25% Convertible Senior Notes was $48.7 million, or $46.2 million net of debt discount.

The carrying value of the equity component representing the embedded conversion option at March 31, 2012 and December 31, 2011 was $10.9 million and $10.9 million, respectively.

Each holder of the notes may require that the Company repurchase some or all of the holder’s notes on March 15, 2013, March 15, 2015, March 15, 2018 and March 15, 2023 at a repurchase price equal to 100% of the principal amount of the notes to be repurchased, plus accrued and unpaid interest, in cash, shares of common stock or a combination of cash and shares of common stock, at the Company’s election. Holders will also have the right, following certain fundamental change transactions, to require the Company to repurchase all or any part of their notes for cash at a repurchase price equal to 100% of the principal amount of the notes to be repurchased plus accrued and unpaid interest. The Company may redeem the notes for cash in whole or in part at any time on or after March 22, 2015 at 100% of the principal amount of the notes to be redeemed plus accrued and unpaid interest.

The notes provide for “net share settlement” of any conversions. Pursuant to this feature, upon conversion of the notes, the Company (1) will pay the note holder an amount in cash equal to the lesser of the conversion obligation or the principal amount of the notes and (2) will settle any excess of the conversion obligation above the notes’ principal amount in the Company’s common stock, cash or a combination thereof, at the Company’s election.

The notes are convertible under certain circumstances, as defined in the indenture agreement, at the holder’s option, at an initial conversion rate of 17.60254 shares of the Company’s common stock per $1,000 principal amount of notes, which is equivalent to an initial conversion price of approximately $56.81 per share, subject to adjustment in certain circumstances.

### Kensington Term Facility

As of March 31, 2012 the balance of the Kensington term facility was $75.8 million.

As a condition to the Kensington term facility with Credit Suisse, the Company agreed to enter into a gold hedging program which protects a minimum of 243,750 ounces of gold production over the life of the facility against the risk associated with fluctuations in the market price of gold. This program consists of a series of zero cost collars which consist of a floor price and a ceiling price of gold. Collars protecting 136,000 ounces of gold call options were outstanding at March 31, 2012. The weighted average call feature of each collar was $1,919.83. Collars protecting 173,000 ounces of gold put options were outstanding at March 31, 2012. The weighted average strike price of the options was $954.74.

The Amended Credit Facility contains affirmative and negative covenants that the Company believes are usual and customary, including financial covenants that Coeur Alaska’s debt to equity ratio shall not exceed 40%, the ratio of project cash flow to debt service shall be at least 125%, the tangible net worth of the Borrower is not less than $325 million and the tangible net worth of the Guarantor is no less than $1.0 billion. Project covenants include covenants as to performance of sales contracts, maintenance and management. As of March 31, 2012, the Company was not in compliance with the debt service ratio covenant. The bank has waived that requirement of the agreement for the year ending December 31, 2012.

### Capital Lease Obligations

As of March 31, 2012 and December 31, 2011, the Company had outstanding balances on capital leases of $22.8 million and $27.0 million, respectively.

### Palmarejo Gold Production Royalty Obligation

The Company recognized accretion expense on the Palmarejo gold production royalty obligation of $5.1 million and $5.3 million for the three months ended March 31, 2012 and 2011, respectively. As of March 31, 2012 and December 31, 2011, the remaining minimum obligation under the royalty agreement was $69.1 million and $72.1 million, respectively.

### Capitalized Interest

The Company capitalizes interest incurred on its various debt instruments as a cost of properties under development. For the three months ended March 31, 2012, and 2011 the Company capitalized interest of $1.1 million and $0.2 million, respectively.

### Litigation and Other Events

For a discussion of litigation and other events, see Note 19 to the Company’s Condensed Consolidated Financial Statements, Litigation and Other Events.

## Market risk

As filed, 8,233 characters.

### Risk Mitigation Overview

The Company is exposed to various market risks as a part of its operations. In an effort to mitigate losses associated with these risks, the Company may, at times, enter into derivative financial instruments. These may take the form of forward sales contracts, foreign currency exchange contracts and interest rate swaps. The Company does not actively engage in the practice of trading derivative instruments for profit. This discussion of the Company’s market risk assessments contains “forward looking statements” that are subject to risks and uncertainties. Actual results and actions could differ materially from those discussed below.

The Company’s operating results are substantially dependent upon the world market prices of silver and gold. The Company has no control over silver and gold prices, which can fluctuate widely and are affected by numerous factors, such as supply and demand and investor sentiment. From time to time, in order to mitigate some of the risk associated with these fluctuations, the Company may enter into forward sale contracts. The Company continually evaluates the potential benefits of engaging in these strategies based on current market conditions. The Company may be exposed to nonperformance risk by counterparties as a result of its hedging activities. This exposure would be limited to the amount that the spot price of the metal falls short of the contract price. The Company enters into contracts and other arrangements from time to time in an effort to reduce the negative effect of price changes on its cashflows. These arrangements typically consist of managing the Company’s exposure to foreign currency exchange rates and market prices associated with changes in gold and silver commodity prices. The Company also may manage price risk by purchasing put options.

### Concentrate Sales Contracts

The Company enters into concentrate sales contracts with third-party smelters. The contracts, in general, provide for a provisional payment based upon provisional assays and quoted metal prices. The provisionally priced sales contain an embedded derivative that is required to be separated from the host contract for accounting purposes. The host contract is the receivable from the sale of concentrates at the forward price at the time of sale. The embedded derivative, which is the final settlement price based on a future price, does not qualify for hedge accounting. These embedded derivatives are recorded as derivative assets (in Prepaid expenses and other) or derivative liabilities (in Accrued liabilities and other) on the balance sheet and are adjusted to fair value through earnings each period until the date of final settlement. At March 31, 2012, the Company had outstanding provisionally priced sales of $16.2 million, consisting of 337,058 ounces of silver and 3,181 ounces of gold, which had a fair value of $16.7 million including the embedded derivative. For each one cent per ounce change in realized silver price, revenue would vary (plus or minus) approximately $3,000; and for each one dollar per ounce change in realized gold price, revenue would vary (plus or minus) approximately $3,200. At December 31, 2011, the Company had outstanding provisionally priced sales of $22.5 million consisting of 189,975 ounces of silver and 9,701 ounces of gold, which had a fair value of approximately $21.7 million including the embedded derivative. For each one cent per ounce change in realized silver price, revenue would vary (plus or minus) approximately $2,000 and for each one dollar per ounce change in realized gold price, revenue would vary (plus or minus) approximately $9,700.

### Foreign Currency Contracts

The Company operates, or has mining interests, in several foreign countries, specifically Argentina, Australia, Bolivia and Mexico, which exposes the Company to risks associated with fluctuations in the exchange rates of the currencies involved. From time to time, as part of its program to manage foreign currency risk, the Company may enter into foreign currency forward exchange contracts. These contracts enable the Company to purchase a fixed amount of foreign currencies at pre-established exchange rates. Gains and losses on foreign exchange contracts that are related to firm commitments are designated and effective as hedges and are deferred and recognized in the same period as the related transaction. The Company has no outstanding firm commitments at March 31, 2012. All other contracts that do not qualify as hedges are marked to market and the resulting gains or losses are recorded in income. The Company continually evaluates the potential benefits of entering into these contracts to mitigate foreign currency risk and proceeds when it believes that the exchange rates are most beneficial.

The Company periodically enters into forward foreign currency contracts to reduce the foreign exchange risk associated with forecasted Mexican peso (“MXP”) operating costs at its Palmarejo mine. At March 31, 2012, the Company had MXP foreign exchange contracts of $25.8 million in U.S. dollars. These contracts require the Company to exchange U.S. dollars for MXP at a weighted average exchange rate of 12.78 MXP to each U.S. dollar and had a fair value of $(0.5) million at March 31, 2012. The Company recorded a mark-to-market gain of $2.7 million for the three months ended March 31, 2012, and a mark-to market gain of $1.0 million for the three months ended March 31, 2011, which is reflected in fair value adjustments, net. A 10% weakening of the MXP would result in a reduction in fair value of $2.8 million. The Company recorded realized gains (losses) of $(0.8) million in production costs applicable to sales during the three months ended March 31, 2012, and $0.3 million during the three months ended March 31, 2011.

### Palmarejo Gold Production Royalty

On January 21, 2009, the Company entered into the gold production royalty transaction with Franco-Nevada Corporation. The minimum royalty obligation ends when payments have been made on a total of 400,000 ounces of gold. As of March 31, 2012, a total of 239,974 ounces of gold remain outstanding under the minimum royalty obligation. The price volatility associated with the minimum royalty obligation is considered an embedded derivative financial instrument under U.S. GAAP. The fair value of the embedded derivative at March 31, 2012 and December 31, 2011 was a liability of $171.8 million and $159.4 million, respectively. During the three months ended March 31, 2012 and 2011, the mark-to-market adjustments for this embedded derivative amounted to a loss of $12.4 million and a gain of $1.1 million, respectively. For the three months ended March 31, 2012 and 2011, realized losses on settlement of the liabilities were $13.2 million and $7.5 million, respectively. The mark-to-market adjustments and realized losses are included in fair value adjustments, net in the consolidated statement of operations.

For each $1.00 increase in the price of gold, the fair value of the net derivative liability at March 31, 2012 would have increased by approximately $0.2 million. For each $1.00 decrease in the price of gold, the fair value of the net derivative liability at March 31, 2012 would have decreased by approximately $0.2 million.

### Kensington Term Facility

On March 31, 2012, in connection with the Kensington term facility, the Company had outstanding call options requiring it to deliver 136,000 ounces of gold at a weighted average strike price of $1,919.83 per ounce if the market price of gold exceeds the strike price. At March 31, 2012, the Company had outstanding put options allowing it to sell 173,000 ounces of gold at a weighted average strike price of $954.74 per ounce if the market price of gold were to fall below the strike price. The contracts will expire over the next four years. As of March 31, 2012 the fair market value of these contracts was a net liability of $17,700.0 million.

Additional information about the Company’s derivative financial instruments may be found in Note 15 to the Company’s Condensed Consolidated Financial Statements, Derivative Financial Instruments and Fair Value of Financial Instruments.

## Controls and procedures

As filed, 1,972 characters.

### (a) Disclosure Controls and Procedures

As of the end of the period covered by this quarterly report, the Company carried out an evaluation, under the supervision and with the participation of the Company’s management, including its Chief Executive Officer and Chief Financial Officer, of the effectiveness of the design and operation of the Company’s disclosure controls and procedures (as such term is defined in Rules 13a-15(e) and 15d-15(e) of the Securities Exchange Act of 1934 (the Exchange Act), and management necessarily applied its judgment in assessing the costs and benefits of such controls and procedures, which by their nature, can provide only reasonable assurance regarding management’s control objectives. The design of any system of controls is based in part upon certain assumptions about the likelihood of future events. Based upon the foregoing, the Company’s Chief Executive Officer and Chief Financial Officer concluded that the Company’s disclosure controls and procedures were effective and operating to provide reasonable assurance that information required to be disclosed by it in the reports it files or submits under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in the SEC’s rules and forms, and to provide reasonable assurance that such information is accumulated and communicated to the Company’s management, including its Chief Executive Officer and Chief Financial Officer, as appropriate to allow timely decisions regarding required disclosure.

### (b) Changes in Internal Control over Financial Reporting

Based on an evaluation by the Company’s Chief Executive Officer and Chief Financial Officer, such officers concluded that there was no change in the Company’s internal control over financial reporting during the quarter ended March 31, 2012 that has materially affected, or is reasonably likely to materially affect, the Company’s internal control over financial reporting.

## Risk factors

As filed, 2,887 characters.

Item 1A (“Risk Factors”) of the Company’s Annual Report on Form 10-K for the year ended December 31, 2011 sets forth information relating to important risks and uncertainties that could materially adversely affect the Company’s business, financial condition or operating results. Those risk factors continue to be relevant to an understanding of the Company’s business, financial condition and operating results. In addition, those risk factors have been supplemented and updated in this Form 10-Q as set forth below. References to “we,” “our” and “us” in these risk factors refer to the Company. Additional risks and uncertainties that we do not presently know or that we currently deem immaterial also may impair our business operations.

***The Company is subject to significant governmental regulations, including under the Federal Mine Safety and Health Act, and related costs and delays may negatively affect its business.***

Mining activities are subject to extensive federal, state, local and foreign laws and regulations governing environmental protection, natural resources, prospecting, development, production, post-closure reclamation, taxes, labor standards and occupational health and safety laws and regulations, including mine safety, toxic substances and other matters. The costs associated with compliance with such laws and regulations are substantial. Possible future laws and regulations, or more restrictive interpretations of current laws and regulations by governmental authorities, could cause additional expense, capital expenditures, restrictions on or suspensions of operations and delays in the development of new properties.

U.S. surface and underground mines like the Kensington and Rochester mines are continuously inspected by the U.S. Mine Safety and Health Administration (MSHA), which inspections often lead to notices of violation. Recently, the MSHA has been conducting more frequent and more comprehensive inspections.

Failure to comply with applicable laws, regulations and permitting requirements may result in enforcement actions, including orders issued by regulatory or judicial authorities causing operations to cease or be curtailed, which may require corrective measures including capital expenditures, installation of additional equipment or remedial actions. In addition, any of our U.S. mines could be subject to a temporary or extended shut down as a result of a violation alleged by the MSHA. Parties engaged in mining operations or in the exploration or development of mineral properties may be required to compensate those suffering loss or damage by reason of the mining activities and may be subject to civil or criminal fines or penalties imposed for violations of applicable laws or regulations. Any such penalties, fines, sanctions or shutdowns could have a material adverse effect on our business and results of operations.

Filed May 7, 2012.
Source: SEC EDGAR, the filing index for accession 0000215466-12-000006. Last ingested by Listed: Nov 14, 2026, 12:15 ET. No prices; not investment advice.
