# Coeur Mining, Inc.: Form 10-Q for the period ended Jun 30, 2012

- Company: [Coeur Mining, Inc.](/companies/cde.md) (CIK 215466)
- Form: 10-Q
- Filed: 2012-08-07
- Accepted by EDGAR: Aug 7, 2012, 12:16 ET
- Period: 2012-06-30
- Accession: 0000215466-12-000021
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/215466/000021546612000021/cde-06302012xq2.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/215466/000021546612000021/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2012-06-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2012-04-01 to 2012-06-30 | $254.4m | us-gaap:SalesRevenueGoodsNet |
| Revenue | 6 months, 2012-01-01 to 2012-06-30 | $459.0m | us-gaap:SalesRevenueGoodsNet |
| Cost of revenue | 3 months, 2012-04-01 to 2012-06-30 | $131.8m | us-gaap:CostOfGoodsSold |
| Cost of revenue | 6 months, 2012-01-01 to 2012-06-30 | $224.4m | us-gaap:CostOfGoodsSold |
| Gross profit | 3 months, 2012-04-01 to 2012-06-30 | $61.6m | us-gaap:GrossProfit |
| Gross profit | 6 months, 2012-01-01 to 2012-06-30 | $121.0m | us-gaap:GrossProfit |
| Operating income | 3 months, 2012-04-01 to 2012-06-30 | $41.6m | us-gaap:OperatingIncomeLoss |
| Operating income | 6 months, 2012-01-01 to 2012-06-30 | $85.8m | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2012-04-01 to 2012-06-30 | $7.6m | us-gaap:InterestExpense |
| Interest expense | 6 months, 2012-01-01 to 2012-06-30 | $14.2m | us-gaap:InterestExpense |
| Income tax | 3 months, 2012-04-01 to 2012-06-30 | $23.9m | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 6 months, 2012-01-01 to 2012-06-30 | $39.3m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2012-04-01 to 2012-06-30 | $23.0m | us-gaap:NetIncomeLoss |
| Net income | 6 months, 2012-01-01 to 2012-06-30 | $26.9m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2012-04-01 to 2012-06-30 | $0.26 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 6 months, 2012-01-01 to 2012-06-30 | $0.30 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2012-04-01 to 2012-06-30 | $0.26 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 6 months, 2012-01-01 to 2012-06-30 | $0.30 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2012-04-01 to 2012-06-30 | 89,733,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 6 months, 2012-01-01 to 2012-06-30 | 89,777,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months, 2012-04-01 to 2012-06-30 | $113.2m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Operating cash flow | 6 months, 2012-01-01 to 2012-06-30 | $130.2m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 3 months, 2012-04-01 to 2012-06-30 | $32.2m | us-gaap:PaymentsToAcquireProductiveAssets |
| Capital expenditure | 6 months, 2012-01-01 to 2012-06-30 | $63.9m | us-gaap:PaymentsToAcquireProductiveAssets |
| Cash and equivalents | at 2012-06-30 | $199.4m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2012-06-30 | $471.2m | us-gaap:AssetsCurrent |
| Total assets | at 2012-06-30 | $3.23bn | us-gaap:Assets |
| Current liabilities | at 2012-06-30 | $269.6m | us-gaap:LiabilitiesCurrent |
| Current portion of debt | at 2012-06-30 | $82.7m | us-gaap:DebtCurrent |
| Shareholders' equity | at 2012-06-30 | $2.16bn | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 68,501 characters.

Management’s Discussion and Analysis of Financial Condition and Results of Operations (“MD&A”) is designed to provide the reader of the Company's financial statements with a narrative from management’s perspective on its financial condition, results of operations, liquidity and other factors that may affect our future results. The Company believes it is important to read its MD&A in conjunction with its Annual Report on Form 10-K for the year ended December 31, 2011, as well as other publicly available information.

This report contains numerous forward-looking statements relating to the Company’s gold and silver mining business, including estimated production data, expected operating schedules, results of operations, ore reserves and resources, expected capital costs and other expected operating data and permit and other regulatory approvals. Such forward-looking statements are identified by the use of words such as “believes,” “intends,” “expects,” “hopes,” “may,” “should,” “will,” “plan,” “projected,” “contemplates,” “anticipates” or similar words. Actual production, operating schedules, results of operations, ore reserves and resources, capital costs and permit and regulatory approvals could differ materially from those projected in the forward-looking statements. The factors that could cause actual results to differ materially from those in the forward-looking statements include: (i) the risk factors set forth below under Part II, Item 1A; (ii) risks and hazards inherent in the mining business (including environmental hazards, industrial accidents, weather or geologically related conditions); (iii) changes in the market prices of gold and silver; (iv) uncertainties inherent in the Company’s production, exploratory and developmental activities, including risks relating to permitting and regulatory delays and disputed mining claims; (v) any future labor disputes or work stoppages; (vi) uncertainties inherent in the estimation of gold and silver ore reserves; (vii) changes that could result from the Company’s future acquisition of new mining properties or businesses; (viii) reliance on third parties to operate certain mines where the Company owns silver production and reserves; (ix) the loss of any third-party smelter to which the Company markets silver and gold; (x) effects of environmental and other governmental regulations; (xi) risks inherent in the ownership or operation of or investment in mining properties or businesses in foreign countries; (xii) the worldwide economic downturn and difficult conditions in the global capital and credit markets; and (xiii) the Company’s possible inability to raise additional financing necessary to conduct its business, make payments or refinance its debt. Readers are cautioned not to put undue reliance on forward-looking statements. The Company disclaims any intent or obligation to update publicly these forward-looking statements, whether as a result of new information, future events or otherwise.

#### Non-U.S. GAAP Measures

We supplement the reporting of our financial information determined under United States generally accepted accounting principles (U.S. GAAP) with certain non-U.S. GAAP financial measures, including cash operating costs, total cash costs, and operating cash flow. We believe that these adjusted measures provide meaningful information to assist management, investors and analysts in understanding our financial results and assessing our prospects for future performance. We believe these adjusted financial measures are important indicators of our recurring operations because they exclude items that may not be indicative of, or are unrelated to our core operating results, and provide a better baseline for analyzing trends in our underlying businesses. We believe cash operating costs and operating cash flow are important measures in assessing the Company's overall financial performance.

#### Introduction to the Company

The Company is a large primary silver producer with growing gold production and has assets located in the United States, Mexico, Bolivia, Argentina and Australia. The Palmarejo mine, San Bartolomé mine, Kensington mine, Rochester mine and Martha mine, each of which is operated by the Company, and the Endeavor mine, which is operated by a non-affiliated party, constituted the Company’s principal sources of mining revenues during the first six months of 2012.

The Company’s business strategy is to discover, acquire, develop and operate low-cost silver and gold operations that it expects to produce long-term cash flow, provide opportunities for growth through continued exploration, and generate superior and sustainable returns for shareholders. The Company’s management focuses on maximizing cash flow from its existing operations, the main elements of which are silver and gold prices, cash costs of production and capital expenditures. The Company also focuses on reducing its non-operating costs in order to maximize cash flow.

The results of the Company’s operations are significantly affected by the prices of silver and gold, which may fluctuate widely and are affected by numerous factors beyond the Company’s control, including interest rates, expectations regarding inflation, currency values, governmental decisions regarding the disposal of precious metals stockpiles, global and regional political and economic conditions and other factors. In addition, the Company faces challenges including raising capital, increasing production and managing social, political and environmental issues. Operating costs at its mines are subject to variation due to a number of factors such as changing commodity prices, ore grades, metallurgy, revisions to mine plans and changes in accounting principles. At foreign locations, operating costs are also influenced by currency fluctuations that may affect the Company’s U.S. dollar costs.

### Overview of Performance

### Production

In the second quarter of 2012, the Company’s total silver production increased 2.8% to 4.9 million ounces as compared to 4.8 million ounces in the comparable period in 2011. The increase is primarily due to higher production from Rochester compared to the same time period in 2011. The Company’s total gold production in the second quarter of 2012 increased by 2,391 ounces, or 3.9%, to 63,047 ounces, as compared to 60,656 ounces in the comparable period in 2011. The increase was primarily driven by the resumption of production early in the quarter at the Kensington mine.

### Sales of Metal

Sales of metal increased $23.3 million, or 10.1%, to $254.4 million in the second quarter of 2012, compared to $231.1 million in the second quarter of 2011, primarily due to production from the Rochester mine and from higher average realized gold prices. The Company’s average realized silver and gold prices during the second quarter of 2012 were $29.28 per ounce and $1,610 per ounce, respectively, representing a decrease of 25.1% and an increase of 7.0% respectively, over last year’s second quarter. Sales of silver contributed 63.2% of the Company’s total metal sales during the second quarter of 2012, compared to 68.7% during the second quarter of 2011.

### Earnings

The Company reported net income of $23.0 million, or $0.26 per share, compared to net income of $38.6 million, or $0.43 per share, for the three months ended June 30, 2012 and 2011, respectively. The earnings reflect non-cash fair value adjustments that increased net income by $16.0 million and decreased net income by $12.4 million in the three months ended June 30, 2012 and 2011, respectively. These fair value adjustments are driven primarily by changing gold prices which impact the estimated future liabilities related to the Palmarejo gold production royalty obligation.

Production costs increased by $54.7 million or 71.0% for the three months ended June 30, 2012 compared to the same time period in 2011 on a higher sales base. The increase was due primarily to a higher volume of ounces sold and increased costs of consumables at San Bartolomé in 2012, higher maintenance costs at Palmarejo, and higher costs at Rochester in 2012 due to the resumption of active mining late in 2011.

Depreciation, depletion, and amortization increased by $3.4 million or 5.9% for the three months ended June 30, 2012 compared to the same time period in 2011 as a result of the new leach pad at Rochester and the new paste plant at Kensington being placed into service.

Administrative and general expenses increased by $6.8 million or 370.4% during the three months ended June 30, 2012 compared to the same time period in 2011. The increase was primarily due to share-based compensation adjustment on cash settled awards resulting from decreasing share prices in the second quarter of 2011 primarily related to shares held by the Company's former CEO and the recognition of debt issuance costs associated with the Company's withdrawn notes offering in the second quarter of 2012.

Exploration expense increased by $2.2 million or 54.6% for the three months ended June 30, 2012 compared to the same time period in 2011 as a result of increased exploration activity at the Palmarejo and Kensington mines, and at the Joaquin project.

Pre-development, care, maintenance and other expenses decreased by $10.8 million or 97.5% during the three months ended June 30, 2012 compared to the same time period in 2011, due to lower expenses at the Rochester mine as a result of the new leach pad being placed into service during the fourth quarter of 2011.

Interest expense decreased $1.7 million or 18.5% during the three months ended June 30, 2012 as compared to the same period in 2011, primarily due to a decrease in total debt outstanding.

### Other Highlights

In addition to the matters discussed above regarding the key elements of the Company’s business strategy, the matters management considers most important in evaluating the Company’s financial condition and results of operations include:

- The average price of silver (Handy & Harman) and gold (London Gold PM) for the three months ended June 30, 2012 was $29.45 and $1,609 per ounce, respectively, compared to $38.40 and $1,506 per ounce, respectively, for the three months ended June 30, 2011. The closing market price of silver and gold on August 6, 2012 was $27.91 per ounce and $1610 per ounce, respectively.
- Net cash provided by operating activities for the second quarter of 2012 was $113.2 million, compared to $111.1 million during the second quarter of 2011.
- The Company spent $32.2 million on capital expenditures in the second quarter of 2012, which is $6.5 million higher

than the same time period last year. The majority of the capital expenditures in the second quarter were as follows: $11.2 million at Palmarejo for capitalized exploration drilling, development of the Guadalupe satellite underground mine and completion of the raised tailings dam at Palmarejo, $9.3 million at Kensington for underground development and final capital projects, and $7.8 million at San Bartolomé for tailings disposal improvements.

- The Company’s ratio of current assets to current liabilities was 1.75 to 1 at June 30, 2012, compared to 1.84 to 1 at December 31, 2011.
- On June 7, 2012, Coeur announced a share repurchase program of up to $100 million of the Company's common stock.
- Since the end of the quarter, the Company has finalized a $100 million, four-year revolving credit facility and has provided the notice to repay the remaining outstanding balance of the Kensington term loan facility.

### Operating Highlights and Statistics

### Palmarejo Mine:

Production during the second quarter of 2012 was 2.4 million ounces of silver, which represented a 0.2% decrease compared to the second quarter of 2011. Gold production was 31,258 ounces which represented a 6.4% decrease from the second quarter of 2011. Cash operating costs and total cash costs during the second quarter increased to $(0.85) per ounce compared to $(3.68) for the second quarter of 2011. Production costs applicable to sales for the three months ended June 30, 2012 increased by 65.6% compared to the same time period in 2011 primarily due to maintenance expenses that are charged to production costs and a temporary work stoppage in May of 2012.

### San Bartolomé Mine:

Silver production for the second quarter of 2012 decreased 15.6% to 1.5 million ounces of silver compared to 1.7 million ounces of silver in the second quarter of 2011. Production costs applicable to sales increased by 61.2% during the second quarter of 2012 as compared to the second quarter of 2011 due to higher volume of ounces sold and an increased costs of consumables used in the mining process. Total cash operating costs per ounce during the second quarter of 2012 were $11.05 and total cash costs per ounce, including royalties and taxes, were $12.04 compared to $8.73 and $10.32, respectively, in the second quarter of 2011.

On October 14, 2009, the Bolivian state-owned mining organization, COMIBOL, announced by resolution that it was temporarily suspending mining activities above the elevation of 4,400 meters above sea level while stability studies of the Cerro Rico mountain are undertaken. The Company holds rights to mine above this elevation under valid contracts with COMIBOL as well as under authorized contracts with local mining cooperatives that hold their rights under contract themselves with COMIBOL. The Company temporarily adjusted its mine plan to confine mining activities to the ore deposits below 4,400 meters above sea level and timely notified COMIBOL of the need to lift the restriction.

The Cooperative Reserva Fiscal, with which the Company has one of those contracts, subsequently interpreted the COMIBOL resolution and determined that the Huacajchi deposit was not covered by such resolution. In March 2010, the Cooperative Reserva Fiscal notified COMIBOL that, based on its interpretation, it was resuming mining of high grade material above the 4,400 meter level in the Huacajchi deposit. In December 2011, the Cooperative Reserva Fiscal sent a similar notification to COMIBOL with respect to a further area above the 4,400 meter level known as Huacajchi Sur. Based on these notifications and on the absence of any objection from COMIBOL, the Company resumed mining operations at the San Bartolomé mine on the Huacajchi deposit and Huacajchi Sur. Mining in other areas above the 4,400 meter level continues to be suspended.

The partial suspension may reduce production until the Company is able to resume mining above 4,400 meters generally. It is uncertain at this time how long the suspension will remain in place. In addition, it is possible that COMIBOL may decide that the Company's operations at the Huacajchi deposit or Huacajchi Sur are subject to the COMIBOL resolution, which may force the Company to cease mining at such deposits. If COMIBOL objects to the Company mining at the Huacajchi deposit or Huacajchi Sur or if the other restrictions are not lifted, the Company may need to write down the carrying value of the asset. It is also uncertain if any new mining or investment policies or shifts in political attitude may affect mining in Bolivia.

### Kensington Mine:

The Kensington mine is an underground gold mine that commenced commercial production on July 3, 2010. Production during the second quarter of 2012 was 21,572 ounces of gold, as compared to 25,758 ounces of gold for the same time period of 2011. Total cash operating costs per ounce in the second quarter of 2012 were $1,348 as compared to $924 for the same time period during 2011. In December of 2011, Kensington entered an expected six month period where processing levels were reduced by 50% to approximately 700 tons per day. This was intended to allow the mine to implement and complete several key initiatives, including:

- Accelerated underground development, resulting in greater operational flexibility and efficiency
- In-fill drilling program to better define the high-grade ore zones and convert existing mineralized material into proven and probable reserves.
- Completion and commissioning of the underground paste backfill plant and related distribution system, providing access to ore in previously mined areas.
- Construction of several underground and surface projects.

On April 26, 2012, the Company announced that Kensington had resumed full production.

### Rochester Mine:

Production was 0.7 million ounces of silver and 10,120 ounces of gold during the second quarter of 2012 compared to 0.3 million ounces of silver and 1,397 ounces of gold in the second quarter of 2011. Production costs applicable to sales increased to $20.8 million during the second quarter of 2012, as compared to $5.3 million during the same time period in 2011 due to the increase in production. Total cash operating costs per ounce in the second quarter of 2012 were $9.83 and total cash costs per ounce, including production taxes, were $11.45 in the second quarter of 2012 as compared to total cash operating costs per ounce of $4.34 and total cash costs per ounce of $6.88 in the second quarter of 2011.

In 2008, the Company commenced studies to investigate the potential to recommence mining and leaching of new material and in 2009 and 2010 completed feasibility studies demonstrating the viability of an expansion of mining and leaching operations at the mine through 2017. The Company prepared an Amended Plan of Operations for resumption of mining within the existing and permitted Rochester pit and construction of an additional heap leach pad, all within the currently permitted mine boundary. The Bureau of Land Management (BLM) deemed this plan complete in August 2009 under federal regulations and initiated the National Environmental Policy Act process. The BLM issued a positive Decision Record (DR) for the mine to extend silver and gold mining operations by several years. The Company began to recover new production ounces in the fourth quarter of 2011.

### Martha Mine:

Silver production at the Martha mine was 0.1 million ounces in the second quarter of 2012 compared to 0.1 million ounces in the second quarter of 2011. Total cash operating costs per ounce in the second quarter of 2012 were $55.07 and total cash costs per ounce, including royalties and taxes, were $56.21, as compared to $38.79 and $40.47, respectively, during the second quarter of 2011.

### Endeavor Mine:

Silver production at the Endeavor mine in the second quarter of 2012 was 0.2 million ounces compared to 0.2 million ounces in the second quarter of 2011. Production costs applicable to sales were $2.6 million for the quarter compared to $3.3 million in the second quarter of 2011. Total cash costs per ounce of silver produced were $17.50 in the second quarter of 2012 compared to $20.04 in the second quarter of 2011. The decrease in total cash costs per ounce was primarily due to the price participation component terms of the silver purchase agreement with CBH Resources Ltd. Under the terms of the price participation component, CDE Australia Pty. Ltd a subsidiary of the Company, pays an additional operating cost contribution of 50% of the amount by which the silver price exceeds $7.00 per ounce.

As of June 30, 2012, CDE Australia Pty Ltd had recovered approximately 92.7% of the transaction consideration consisting of 4.0 million payable ounces, or 19.8% of the 20.0 million maximum payable silver ounces to which CDE Australia Pty Ltd is entitled under the terms of the silver sale and purchase agreement.

### Minority Investments in Silver and Gold Development Companies

Between January 1, 2011 and June 30, 2012, the Company has made strategic minority investments in seven silver and gold development companies in North and South America as part of its business growth strategy. Coeur made such investments in Apogee Silver Ltd; Caracara Silver Peru, Inc.; Huldra Silver, Inc.; Silver Bull Resources, Inc.; Soltoro Ltd.; Pershing Gold Corporation; and International Northair Mines Ltd. As of June 30, 2012, the Company's investments in these companies had an estimated fair value of $21.2 million. On August 6, 2012, the Company entered into an agreement to invest an additional $2.0 million in Huldra Silver, Inc.

### Operating Statistics from Continuing Operations

The following table presents information by mine and consolidated sales information for the three and six month periods ended June 30, 2012 and 2011:

| Silver Operations: Palmarejo | Three months ended June 30, 2012 | 2011 | Six months ended June 30, 2012 | 2011 |
| --- | ---: | ---: | ---: | ---: |
| Tons milled | 489,924 | 414,719 | 1,018,467 | 813,459 |
| Ore grade/Ag oz | 5.74 | 7.30 | 5.94 | 6.65 |
| Ore grade/Au oz | 0.07 | 0.08 | 0.07 | 0.08 |
| Recovery/Ag oz | 84.2% | 78.3% | 80.2% | 75.8% |
| Recovery/Au oz | 92.0% | 95.2% | 92.6% | 91.5% |
| Silver production ounces | 2,365,484 | 2,370,536 | 4,848,298 | 4,100,303 |
| Gold production ounces | 31,258 | 33,389 | 62,338 | 61,148 |
| Cash operating cost/oz | $(0.85) | $(3.68) | $(1.58) | $(0.10) |
| Cash cost/oz | $(0.85) | $(3.68) | $(1.58) | $(0.10) |
| Total production cost/oz | $17.28 | $14.16 | $15.10 | $18.48 |
| **San Bartolomé** |  |  |  |  |
| Tons milled | 391,005 | 378,640 | 769,109 | 766,308 |
| Ore grade/Ag oz | 4.26 | 5.24 | 4.43 | 5.11 |
| Recovery/Ag oz | 88.3% | 87.7% | 89.8% | 88.2% |
| Silver production ounces | 1,470,342 | 1,741,578 | 3,061,634 | 3,452,525 |
| Cash operating cost/oz | $11.05 | $8.73 | $10.62 | $8.93 |
| Cash cost/oz | $12.04 | $10.32 | $11.76 | $10.40 |
| Total production cost/oz | $14.89 | $13.51 | $14.44 | $13.44 |
| **Martha** |  |  |  |  |
| Tons milled | 39,199 | 22,122 | 73,268 | 39,940 |
| Ore grade/Ag oz | 3.52 | 5.44 | 3.94 | 8.39 |
| Ore grade/Au oz | 0.003 | 0.01 | 0.004 | 0.01 |
| Recovery/Ag oz | 78.2% | 84.0% | 79.8% | 83.8% |
| Recovery/Au oz | 72.4% | 72.4% | 68.6% | 74.3% |
| Silver production ounces | 107,895 | 101,122 | 230,688 | 281,107 |
| Gold production ounces | 97 | 112 | 181 | 356 |
| Cash operating cost/oz | $55.07 | $38.79 | $50.50 | $29.60 |
| Cash cost/oz | $56.21 | $40.47 | $51.39 | $30.86 |
| Total production cost/oz | $62.30 | $33.83 | $56.74 | $30.92 |
| Rochester (A) |  |  |  |  |
| Tons milled | 2,268,896 | — | 4,278,414 | — |
| Ore grade/Ag oz | 0.63 | — | 0.59 | — |
| Ore grade/Au oz | 0.005 | — | 0.005 | — |
| Recovery/Ag oz | 49.8% | — | 45.7% | — |
| Recovery/Au oz | 84.0% | — | 74.9% | — |
| Silver production ounces | 712,706 | 333,432 | 1,154,043 | 667,127 |
| Gold production ounces | 10,120 | 1,397 | 15,412 | 2,848 |
| Cash operating cost/oz | $9.83 | $4.34 | $15.00 | $7.31 |
| Cash cost/oz | $11.45 | $6.88 | $16.54 | $9.37 |
| Total production cost/oz | $14.66 | $8.92 | $20.02 | $11.22 |

31

| Endeavor | Three months ended June 30, 2012 | 2011 | Six months ended June 30, 2012 | 2011 |
| --- | ---: | ---: | ---: | ---: |
| Tons milled | 201,057 | 207,388 | 396,903 | 374,674 |
| Ore grade/Ag oz | 3.31 | 2.41 | 3.33 | 2.23 |
| Recovery/Ag oz | 36.1% | 42.9% | 36.9% | 43.5% |
| Silver production ounces | 240,168 | 214,613 | 488,126 | 363,795 |
| Cash operating cost/oz | $17.50 | $20.04 | 17.07 | $18.85 |
| Cash cost/oz | $17.50 | $20.04 | 17.07 | $18.85 |
| Total production cost/oz | $24.13 | $24.07 | 23.70 | $22.93 |
| **Gold Operation:** |  |  |  |  |
| Kensington(B) |  |  |  |  |
| Tons milled | 97,794 | 121,565 | 141,730 | 227,385 |
| Ore grade/Au oz | 0.23 | 0.23 | 0.22 | 0.23 |
| Recovery/Au oz | 94.2% | 93.0% | 94.0% | 92.7% |
| Gold production ounces | 21,572 | 25,758 | 29,016 | 49,434 |
| Cash operating cost/oz | $1,348 | $924 | $1,697 | $955 |
| Cash cost/oz | $1,348 | $924 | $1,697 | $955 |
| Total production cost/oz | $1,799 | $1,308 | $2,260 | $1,345 |
| **CONSOLIDATED PRODUCTION TOTALS (B)** |  |  |  |  |
| Total silver ounces | 4,896,595 | 4,761,281 | 9,782,789 | 8,864,857 |
| Total gold ounces | 63,047 | 60,656 | 106,947 | 113,786 |
| **Silver Operations:(C)** |  |  |  |  |
| Cash operating cost per oz - silver | $6.41 | $3.39 | $6.35 | $5.69 |
| Cash cost per oz - silver | $6.97 | $4.19 | $6.91 | $6.46 |
| Total production cost oz - silver | $17.51 | $14.42 | $16.88 | $16.55 |
| **Gold Operation:(D)** |  |  |  |  |
| Cash operating cost per oz - gold | $1,348 | $924 | $1,697 | $954.78 |
| Cash cost per oz - gold | $1,348 | $924 | $1,697 | $954.78 |
| Total production cost per oz - gold | $1,799 | $1,308 | $2,260 | $1,345 |
| CONSOLIDATED SALES TOTALS (E) |  |  |  |  |
| Silver ounces sold | 5,601,953 | 4,133,283 | 9,892,001 | 7,792,436 |
| Gold ounces sold | 59,579 | 49,930 | 98,464 | 115,852 |
| Realized price per silver ounce | $29.28 | $39.11 | $30.72 | $35.42 |
| Realized price per gold ounce | $1,610 | $1,504 | $1,646 | $1,430 |

(A) The Rochester mine recommenced production in the fourth quarter of 2011. The leach cycle at Rochester requires five to ten years to recover gold and silver contained in the ore. The Company estimates the ultimate recovery to be approximately 61% for silver and 92% for gold. However, ultimate recoveries will not be known until leaching operations cease, which is currently estimated for 2017. Current recovery may vary significantly from ultimate recovery. See Critical Accounting Policies and Estimates – Ore on Leach Pad in the Company’s Form 10-K for the year ended December 31, 2011.

(B) Current production ounces and recoveries reflect final metal settlements of previously reported production ounces.

(C) Amount includes by-product gold credits deducted in computing cash costs per ounce.

(D) Amounts reflect Kensington per ounce statistics only.

(E) Units sold at realized metal prices will not match reported metal sales due primarily to the effects on revenues of mark-to-market adjustments on embedded derivatives in the Company’s provisionally priced sales contracts.

“Operating Costs per Ounce” and “Cash Costs per Ounce” are calculated by dividing the operating cash costs and cash costs computed for each of the Company’s mining properties for a specified period by the amount of gold ounces or silver ounces produced by that property during that same period. Management uses cash operating costs per ounce and cash costs per ounce as key indicators of the profitability of each of its mining properties. Gold and silver are sold and priced in the world financial markets on a U.S. dollar per ounce basis.

“Cash Operating Costs” and “Cash Costs” are costs directly related to the physical activities of producing silver and gold, and include mining, processing and other plant costs, third-party refining and smelting costs, marketing expenses, on-site general and administrative costs, royalties, in-mine drilling expenditures related to production and other direct costs. Produced by-product metal units at the average market price is deducted from the above in computing cash costs. Cash costs exclude depreciation, depletion and amortization, accretion, corporate general and administrative expenses, exploration, interest, and pre-feasibility costs. Cash operating costs include all cash costs except production taxes and royalties, if applicable. Cash costs are calculated and presented using the “Gold Institute Production Cost Standard” applied consistently for all periods presented.

Total cash operating costs and cash costs per ounce are non-U.S. GAAP measures and investors are cautioned not to place undue reliance on them and are urged to read all U.S. GAAP accounting disclosures presented in the consolidated financial statements and accompanying footnotes. In addition, see the reconciliation of “cash costs” to production costs under “Reconciliation of Non-U.S. GAAP Cash Costs to U.S. GAAP Production Costs” set forth below. We supplement the reporting of our financial information determined under United States generally accepted accounting principles (U.S. GAAP) with certain non-U.S. GAAP financial measures, including cash operating costs and operating cash flow. We believe that these adjusted measures provide meaningful information to assist management, investors and analysts in understanding our financial results and assessing our prospects for future performance. We believe these adjusted financial measures are important indicators of our recurring operations because they exclude items that may not be indicative of, or are unrelated to our core operating results, and provide a better baseline for analyzing trends in our underlying businesses. We believe cash operating costs and operating cash flow are important measures in assessing the Company's overall financial performance.

The following tables present a reconciliation between non-U.S. GAAP cash operating costs per ounce and cash costs per ounce to production costs applicable to sales including depreciation, depletion and amortization, which are calculated in accordance with U.S. GAAP:

*Reconciliation of Non-U.S. GAAP Cash Costs to U.S. GAAP Production Costs Three months ended June 30, 2012*

*(In thousands except ounces and per ounce costs)*

|  | Palmarejo | San Bartolomé | Kensington | Rochester | Martha | Endeavor | Total |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Total cash operating cost (Non-U.S. GAAP) | $(2,009) | $16,249 | $29,083 | $7,008 | $5,942 | $4,204 | $60,477 |
| Royalties | — | 1,457 | — | 510 | 124 | — | 2,091 |
| Production taxes | — | — | — | 641 | — | — | 641 |
| Total cash costs (Non-U.S. GAAP) | $(2,009) | $17,706 | $29,083 | $8,159 | $6,066 | $4,204 | $63,209 |
| Add/Subtract: |  |  |  |  |  |  |  |
| Third party smelting costs | — | — | (2,820) | — | (1,444) | (1,449) | (5,713) |
| By-product credit | 50,363 | — | — | 16,295 | 157 | — | 66,815 |
| Other adjustments | 124 | 117 | 7 | 229 | 26 | — | 503 |
| Change in inventory | 14,060 | 4,950 | (10,165) | (3,931) | 2,297 | (202) | 7,009 |
| Depreciation, depletion and amortization | 42,741 | 4,070 | 9,719 | 2,060 | 631 | 1,592 | 60,813 |
| Production costs applicable to sales, including depreciation, depletion and amortization (U.S. GAAP) | $105,279 | $26,843 | $25,824 | $22,812 | $7,733 | $4,145 | $192,636 |
| Production of silver (ounces) | 2,365,484 | 1,470,342 | — | 712,706 | 107,895 | 240,168 | 4,896,595 |
| Cash operating cost per silver ounce | $(0.85) | $11.05 | $— | $9.83 | $55.07 | $17.50 | $6.41 |
| Cash costs per silver ounce | $(0.85) | $12.04 | $— | $11.45 | $56.21 | $17.50 | $6.97 |
| Production of gold (ounces) | — | — | 21,572 | — | — | — | 21,572 |
| Cash operating cost per gold ounce | $— | $— | $1,348 | $— | $— | $— | $1,348 |
| Cash cost per gold ounce | $— | $— | $1,348 | $— | $— | $— | $1,348 |

33

*Reconciliation of Non-U.S. GAAP Cash Costs to U.S. GAAP Production Costs Six months ended June 30, 2012*

*(In thousands except ounces and per ounce costs)*

|  | Palmarejo | San Bartolomé | Kensington | Rochester | Martha | Endeavor | Total |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Total cash operating cost (Non-U.S. GAAP) | $(7,652) | $32,502 | $49,251 | $17,311 | $11,649 | $8,331 | $111,392 |
| Royalties | — | 3,493 | — | 1,119 | 206 | — | 4,818 |
| Production taxes | — | — | — | 653 | — | — | 653 |
| Total cash costs (Non-U.S. GAAP) | $(7,652) | $35,995 | $49,251 | $19,083 | $11,855 | $8,331 | $116,863 |
| Add/Subtract: |  |  |  |  |  |  |  |
| Third party smelting costs | — | — | (3,903) | — | (3,418) | (2,238) | (9,559) |
| By-product credit | 102,889 | — | — | 25,252 | 298 | — | 128,439 |
| Other adjustments | 368 | (77) | 14 | 316 | 83 | — | 704 |
| Change in inventory | 12,793 | 463 | (12,166) | (14,335) | 1,977 | (803) | (12,071) |
| Depreciation, depletion and amortization | 80,501 | 8,289 | 16,324 | 3,702 | 1,151 | 3,236 | 113,203 |
| Production costs applicable to sales, including depreciation, depletion and amortization (U.S. GAAP) | $188,899 | $44,670 | $49,520 | $34,018 | $11,946 | $8,526 | $337,579 |
| Production of silver (ounces) | 4,848,298 | 3,061,634 | — | 1,154,043 | 230,688 | 488,126 | 9,782,789 |
| Cash operating cost per silver ounce | $(1.58) | $10.62 | $— | $15.00 | $50.50 | $17.07 | $6.35 |
| Cash costs per silver ounce | $(1.58) | $11.76 | $— | $16.54 | $51.39 | $17.07 | $6.91 |
| Production of gold (ounces) | — | — | 29,016 | — | — | — | 29,016 |
| Cash operating cost per gold ounce | $— | $— | $1,697 | $— | $— | $— | $1,697 |
| Cash cost per gold ounce | $— | $— | $1,697 | $— | $— | $— | $1,697 |

*Reconciliation of Non-U.S. GAAP Cash Costs to U.S. GAAP Production Costs Three months ended June 30, 2011*

*(In thousands except ounces and per ounce costs)*

|  | Palmarejo | San Bartolomé | Kensington | Rochester | Martha | Endeavor | Total |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Total cash operating cost (Non-U.S. GAAP) | $(8,719) | $15,211 | $23,789 | $1,446 | $3,922 | $4,301 | $39,950 |
| Royalties | — | 2,760 | — | 578 | 170 | — | 3,508 |
| Production taxes | — | — | — | 268 | — | — | 268 |
| Total cash costs (Non-U.S. GAAP) | $(8,719) | $17,971 | $23,789 | $2,292 | $4,092 | $4,301 | $43,726 |
| Add/Subtract: |  |  |  |  |  |  |  |
| Third party smelting costs | — | — | (3,375) | — | (426) | (1,018) | (4,819) |
| By-product credit | 50,188 | — | — | 2,106 | 169 | — | 52,463 |
| Other adjustments | 552 | 376 | 19 | 97 | 76 | — | 1,120 |
| Change in inventory | (4,252) | (4,221) | (7,588) | 846 | (162) | (10) | (15,387) |
| Depreciation, depletion and amortization | 41,745 | 5,182 | 9,889 | 584 | (748) | 865 | 57,517 |
| Production costs applicable to sales, including depreciation, depletion and amortization (U.S. GAAP) | $79,514 | $19,308 | $22,734 | $5,925 | $3,001 | $4,138 | $134,620 |
| Production of silver (ounces) | 2,370,536 | 1,741,578 | — | 333,432 | 101,122 | 214,613 | 4,761,281 |
| Cash operating cost per silver ounce | $(3.68) | $8.73 | $— | $4.34 | $38.79 | $20.04 | $3.39 |
| Cash costs per silver ounce | $(3.68) | $10.32 | $— | $6.88 | $40.47 | $20.04 | $4.19 |
| Production of gold (ounces) | — | — | 25,758 | — | — | — | 25,758 |
| Cash operating cost per gold ounce | $— | $— | $924 | $— | $— | $— | $924 |
| Cash cost per gold ounce | $— | $— | $924 | $— | $— | $— | $924 |

34

*Reconciliation of Non-U.S. GAAP Cash Costs to U.S. GAAP Production Costs Six months ended June 30, 2011*

*(In thousands except ounces and per ounce costs)*

|  | Palmarejo | San Bartolomé | Kensington | Rochester | Martha | Endeavor | Total |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Total cash operating cost (Non-U.S. GAAP) | $(407) | $30,825 | $47,199 | $4,875 | $8,322 | $6,859 | $97,673 |
| Royalties | — | 5,064 | — | 908 | 353 | — | 6,325 |
| Production taxes | — | — | — | 468 | — | — | 468 |
| Total cash costs (Non-U.S. GAAP) | $(407) | $35,889 | $47,199 | $6,251 | $8,675 | $6,859 | $104,466 |
| Add/Subtract: |  |  |  |  |  |  |  |
| Third party smelting costs | — | — | (6,025) | — | (1,799) | (1,581) | (9,405) |
| By-product credit | 88,656 | — | — | 4,121 | 508 | — | 93,285 |
| Other adjustments | 773 | 188 | 19 | 138 | 172 | — | 1,290 |
| Change in inventory | (13,884) | (7,833) | 4,572 | 2,188 | (4,196) | (905) | (20,058) |
| Depreciation, depletion and amortization | 75,411 | 10,325 | 19,254 | 1,098 | (157) | 1,483 | 107,414 |
| Production costs applicable to sales, including depreciation, depletion and amortization (U.S. GAAP) | $150,549 | $38,569 | $65,019 | $13,796 | $3,203 | $5,856 | $276,992 |
| Production of silver (ounces) | 4,100,303 | 3,452,525 | — | 667,127 | 281,107 | 363,795 | 8,864,857 |
| Cash operating cost per silver ounce | $(0.10) | $8.93 | $— | $7.31 | $29.60 | $18.85 | $5.69 |
| Cash costs per silver ounce | $(0.10) | $10.40 | $— | $9.37 | $30.86 | $18.85 | $6.46 |
| Production of gold (ounces) | — | — | 49,434 | — | — | — | 49,434 |
| Cash operating cost per gold ounce | $— | $— | $955 | $— | $— | $— | $955 |
| Cash cost per gold ounce | $— | $— | $955 | $— | $— | $— | $955 |

### Exploration Activity

During the second quarter, the Company completed 60,292 meters (197,808 feet) of core and reverse circulation drilling and trenching in its exploration program. The majority of this drilling was devoted to Palmarejo, Rochester, projects in Argentina, Kensington, San Bartolomé, and the Carrizalillo project in Chile. At its peak, up to 17 drills were employed company-wide during the second quarter. Coeur's exploration teams received three awards from the International Society of Mine Safety Professionals in recognition of their commitment to safety.

### Palmarejo

The Company completed 32,321 meters (106,040 feet) of exploration core drilling in the Palmarejo district. This drilling was divided between targets around the current Palmarejo mine and at the Guadalupe area located approximately six kilometers from the Palmarejo mine. Mineralization at Guadalupe has now been defined over a length of more than 2.5 kilometers (+8,200 feet) from southeast to northwest and remains open to the northwest and at depth. Since the last mineral resource and reserve estimate for Guadalupe was prepared, 100 new core holes have been completed and will be used to prepare a new model of mineral resources and reserves at year-end. Surface drilling commenced on the new La Blanca Norte zone situated immediately northwest of the Palmarejo mill complex. A helicopter-borne geophysical (magnetics) survey was completed over the Company's entire land holding, which is helping to identify new drill targets.

### Kensington

Exploration at Kensington consisted of 4,534 meters (14,875 feet) of core drilling. Nearly all of the drilling was devoted to infill drilling of the Raven zone, which is located approximately 670 meters (2,200 feet) due west of the Kensington ore body. In addition, drilling recommenced on the new Kensington South target where drilling encountered veining and alteration similar to that of the main Kensington mine with encouraging gold grades. A helicopter-borne geophysical (magnetics) survey was conducted to help identify future drill targets.

In addition, the Company completed 3,976 meters (13,045 feet) of definition core drilling at Zone 10, which is expected to constitute a major part of the mine plan for the next three years. Assay results from 85 new holes from independent laboratories showed multiple gold-mineralized intervals, ranging from one foot to 34-feet true widths and gold grades from a cutoff grade of 0.1 to over 6.0 ounces per ton. The Company plans to use this data to update the mineral resources and reserves of Zone 10.

### Joaquin, Martha and other Argentina Sites

A total of 7,091 meters (23,264 feet) of drilling was completed in the Santa Cruz Province of southern Argentina in the second quarter. Of the total, 3,450 meters (11,319 feet) was completed at the Joaquin joint venture property, located approximately 70 kilometers (43 miles) north of the Martha mine, to complete infill drilling at La Negra and La Morocha and test new targets on the property. Data from this drilling, and drilling completed in the second half of 2011, were used to update the 2011 estimate of mineralized material defined in two deposits, La Negra and La Morocha.

### Rochester

Drilling at Rochester totaled 14,548 meters (47,730 feet) in 252 holes on the property. Over 80% of this drilling focused on Rochester stockpile materials previously considered uneconomic for a total of 11,680 meters (38,320 feet) with the remainder at Northwest Rochester.

### San Bartolomé

One hundred new backhoe trenches were completed and sampled at San Bartolomé. In the third quarter, trenching and sampling are planned to shift to new targets due west of the current mining area.

### Carrizalillo

An initial program of 3 core holes, totaling 1,328 meters (4,357 feet) was completed at this prospect in north-central Chile. Three prominent zones of hydrothermal alteration with anomalous precious metals detected from past sampling were tested. Results are pending.

### Critical Accounting Policies and Estimates

**Use of Estimates:** The preparation of the Company’s consolidated financial statements in conformity with U.S. GAAP requires management to make estimates and assumptions that affect the amounts reported in their consolidated financial statements and accompanying notes. The areas requiring significant management estimates and assumptions relate to: recoverable ounces from proven and probable reserves that are the basis of future cash flow estimates and units-of-production depreciation and amortization calculations; useful lives utilized for depreciation, depletion and amortization; estimates of future cash flows for long-lived assets; estimates of recoverable gold and silver ounces in ore on leach pad; amount and timing of reclamation and remediation costs; valuation allowance for deferred tax assets; assessment of valuation allowance for value added tax receivables; and other employee benefit liabilities.

Please see Note 2 – Summary of Significant Accounting Policies for additional critical accounting policies and estimates.

### RESULTS OF OPERATIONS

### Three Months Ended June 30, 2012 Compared to Three Months Ended June 30, 2011

Sales of metal from continuing operations in the second quarter of 2012 increased by 10.1% to $254.4 million from $231.1 million in the second quarter of 2011. The increase in sales of metal was due to an increase in silver and gold ounces sold as well as an increase in realized prices for gold. In the second quarter of 2012, the Company sold 5.6 million ounces of silver and 59,579 ounces of gold compared to 4.1 million ounces of silver and 49,930 ounces of gold for the same period in 2011. Realized silver and gold prices in the second quarter of 2012 decreased 25.1% and increased 7.0%, respectively, over the second quarter 2011. Realized silver and gold prices were $29.28 and $1,610 per ounce, respectively, in the second quarter of 2012, compared to $39.11 and $1,504 per ounce, respectively, in the comparable quarter of 2011.

Included in sales of metals are the by-product sales derived from the sale of gold by the Company's silver mines. Total gold sales for the periods ended June 30, 2012 and 2011 were $93.7 million and $72.3 million, respectively. Of those totals, by-product metal sales were $72.6 million compared to $46.3 million, respectively. The Company believes that presentation of these metal sales as a by-product from its silver operations will continue to be appropriate in the future. The increases in by-product sales were primarily due to the increase in gold prices.

In the second quarter of 2012, the Company produced a total of 4.9 million ounces of silver and 63,047 ounces of gold, compared to 4.8 million ounces of silver and 60,656 ounces of gold in the second quarter of 2011.

While quarterly sales of metal rose 10.1%, production costs applicable to sales of metal in the second quarter of 2012 increased from $77.1 million in the second quarter of 2011 to $131.8 million in the second quarter of 2012. The increase was due primarily to a higher volume of ounces sold and increased costs of consumables at San Bartolomé in 2012, higher maintenance costs at Palmarejo, and higher costs at Rochester in 2012 due to the resumption of active mining late in 2011.

Depreciation, depletion, and amortization increased by $3.4 million, from $57.6 million to $61.0 million, compared to the second quarter of 2011. The increase is a result of the new leach pad at Rochester and the new paste plant at Kensington being placed into service.

#### Costs and Expenses

Administrative and general expenses increased by $6.8 million, from $1.8 million to $8.6 million, as compared to the second quarter of 2011. The increase was primarily due to share-based compensation adjustment on cash settled awards resulting from decreasing share prices in the second quarter of 2011 primarily related to shares held by the Company's former CEO and the recognition of debt issuance costs associated with the Company's withdrawn notes offering in the second quarter of 2012.

Exploration expenses increased to $6.3 million in the second quarter of 2012 compared to $4.1 million in the same period of 2011 primarily due to increased exploration activity at the Palmarejo and Kensington mines, and at the Joaquin project.

Due to high operating costs and a short remaining expected mine life, the Company evaluated strategic and operational alternatives for the Martha mine and recorded an impairment charge of $4.8 million in the second quarter of 2012. The segment assets attributable to the Martha mine after the impairment was recorded were $13.1 million as of June 30, 2012.

#### Other Income and Expenses

Non-cash fair value adjustments, net in the three months ended June 30, 2012 were a gain of $16.0 million compared to a loss of $12.4 million in the second quarter of 2011. These fair value adjustments are driven primarily by changing gold prices which impact the estimated future liabilities related to the Palmarejo gold production royalty obligation.

Interest income and other decreased by $6.0 million to a loss of $3.2 million in the second quarter of 2012 compared with a gain of $2.8 million in the second quarter of 2011. The decrease was primarily due to foreign currency transactions in Mexico.

Interest expense, net of capitalized interest, decreased to $7.6 million in the second quarter of 2012 from $9.3 million in the second quarter of 2011. The decrease in interest expense was primarily due to a decrease in total debt and capital leases outstanding.

#### Income Taxes

For the three months ended June 30, 2012, the Company reported an income tax provision of approximately $23.9 million compared to an income tax provision of $21.4 million for the same time period in 2011. The following table summarizes the components of the Company’s income tax provision from continuing operations for the three months ended June 30, 2012 and 2011 (in thousands):

|  | Three months ended June 30, 2012 | 2011 |
| --- | ---: | ---: |
| United States | $(388) | $(2,202) |
| Argentina | (38) | (15) |
| Australia | (495) | (700) |
| Mexico | (12,052) | (6,376) |
| Bolivia | (10,889) | (12,109) |
| Income tax provision | $(23,862) | $(21,402) |

During the three months ended June 30, 2012, the Company recognized a current provision in Bolivia, Mexico and Australia primarily related to higher metal prices, inflation adjustments on non-monetary assets, and the Company being subject to the Mexico IETU tax; which is a form of alternative minimum tax. In addition, the Company recognized a net $9.7 million deferred tax provision for the recognition of deferred taxes on deductible temporary differences, foreign exchange rate adjustments and net operating loss carryforwards in various jurisdictions (principally in the U.S. and Mexico).

During the three months ended June 30, 2011, the Company recognized a current provision in Bolivia and Australia primarily related to higher metal prices and inflationary adjustments on non-monetary assets. Further, the Company accrued foreign withholding taxes of approximately $0.7 million on inter-company transactions between the U.S. parent and subsidiaries operating in Mexico, Argentina and Australia. In addition, the Company recognized a net $3.9 million deferred tax provision for the recognition of deferred taxes on deductible temporary differences, foreign exchange rate adjustments and net operating loss carryforwards in various jurisdictions (principally in Bolivia and Mexico).

### Six Months Ended June 30, 2012 Compared to Six Months Ended June 30, 2011

Sales of metal from continuing operations in the six months ended June 30, 2012 increased by 6.6% to $459.0 million from $430.7 million in the six months ended June 30, 2011. The increase in sales of metal was due to an increase in silver ounces sold as well as an increase in the realized price of gold. In the six months ended June 30, 2012, the Company sold 9.9 million ounces of silver and 98,464 ounces of gold compared to 7.8 million ounces of silver and 115,852 ounces of gold for the same period in

2011\. Realized silver and gold prices in the six months ended June 30, 2012 decreased by 13.3% and increased by15.1%, respectively, over the same time period in 2011. Realized silver and gold prices were $30.72 and $1,646 per ounce, respectively, in the six months ended June 30, 2012, compared to $35.42 and $1,430 per ounce, respectively, in the comparable time period of 2011.

Included in sales of metals are the by-product sales derived from the sale of gold by the Company's silver mines. Total gold sales for the six months ended June 30, 2012 and 2011 were $159.0 million and $159.4 million, respectively. Of those totals, by-product metal sales were $127.5 million compared to $85.2 million, respectively. The Company believes that presentation of these metal sales as a by-product from its silver operations will continue to be appropriate in the future. The increases in by-product sales were primarily due to the increase in gold prices.

In the six months ended June 30, 2012, the Company produced a total of 9.8 million ounces of silver and 106,947 ounces of gold, compared to 8.9 million ounces of silver and 113,786 ounces of gold in the same time period of 2011.

While sales of metal rose 6.6%, production costs applicable to sales of metal increased from $169.6 million in the six months ended June 30, 2011 to $224.4 million in the six months ended June 30, 2012. The increase was due primarily to a higher volume of ounces sold and increased costs of consumables at San Bartolomé in 2012, higher maintenance costs at Palmarejo, and higher costs at Rochester in 2012 due to the resumption of active mining late in 2011.

Depreciation, depletion, and amortization increased by $5.9 million, from $107.7 million to $113.6 million, compared to the six months ended June 30, 2011. The increase is a result of the new leach pad at Rochester and the new paste plant at Kensington being placed into service.

#### Costs and Expenses

Administrative and general expenses increased by $2.1 million, from $14.1 million to $16.2 million, as compared to the six months ended June 30, 2011. The increase was primarily due to share-based compensation adjustment on cash settled awards resulting from decreasing share prices in the second quarter of 2011 primarily related to shares held by the Company's former CEO and the recognition of debt issuance costs associated with the Company's withdrawn notes offering in the second quarter of 2012.

Exploration expenses increased to $12.9 million in the six months ended June 30, 2012 compared to $6.8 million in the same period of 2011 primarily due to increased exploration activity at the Palmarejo, Rochester, Kensington, and Martha mines.

Due to high operating costs and a short remaining expected mine life, the Company evaluated strategic and operational alternatives for the Martha mine and recorded an impairment charge of $4.8 million in the second quarter of 2012. The segment assets attributable to the Martha mine after the impairment was recorded were $13.1 million as of June 30, 2012.

#### Other Income and Expenses

Non-cash fair value adjustments, net in the six months ended June 30, 2012 were a loss of $7.1 million compared to a loss of $17.7 million in the six months ended June 30, 2011. The majority of the increase in the fair value adjustment, net was due to the impact of changing gold prices on the Palmarejo gold production royalty obligation.

Interest income and other decreased by $2.9 million to $1.8 million in the six months ended June 30, 2012, compared with $4.7 million in the same time period in 2011. The decrease was primarily due to foreign currency transactions in Mexico.

Interest expense, net of capitalized interest, decreased to $14.2 million in the six months ended June 30, 2012 from $18.6 million in the the same time period in 2011. The decrease in interest expense was primarily due to a decrease in total outstanding debt and capital lease obligations.

#### Income Taxes

For the six months ended June 30, 2012, the Company reported an income tax provision of approximately $39.3 million compared to an income tax provision of $34.3 million for the same time period in 2011.

The following table summarizes the components of the Company’s income tax provision for the six months ended June 30, 2012 and 2011 (in thousands):

|  | Six months ended June 30, 2012 | 2011 |
| --- | ---: | ---: |
| United States | $(3,525) | $(958) |
| Argentina | (239) | 83 |
| Australia | (1,206) | (1,118) |
| Mexico | (15,750) | (10,202) |
| Bolivia | (18,578) | (22,146) |
| Income tax provision | $(39,298) | $(34,341) |

During the six months ended June 30, 2012, the Company recognized a current provision in Bolivia, Mexico and Australia primarily related to higher metal prices and inflation adjustments on non-monetary assets, and the Company being subject to the Mexico IETU tax; which is a form of alternative minimum tax. In addition, the Company recognized a net $17.4 million deferred tax provision for the recognition of deferred taxes on deductible temporary differences, foreign exchange rate adjustments and net operating loss carryforwards in various jurisdictions (principally in the U.S. and Mexico).

During the six months ended June 30, 2011, the Company recognized a current provision in Bolivia and Australia primarily related to higher metal prices and inflationary adjustments on non-monetary assets. Further, the Company accrued foreign withholding taxes of approximately $1.1 million on inter-company transactions between the U.S. parent and subsidiaries operating in Mexico, Argentina and Australia, and a $1.9 million benefit for anticipated operating losses in the U.S. In addition, the Company recognized a net $9.4 million deferred tax provision for the recognition of deferred taxes on deductible temporary differences, foreign exchange rate adjustments and net operating loss carryforwards in various jurisdictions (principally in Bolivia, the U.S. and Mexico).

#### LIQUIDITY AND CAPITAL RESOURCES

### Liquidity

#### Working Capital; Cash and Cash Equivalents

As of June 30, 2012, the Company’s cash, cash equivalents and short term investments totaled $200.3 million compared to $195.3 million as of December 31, 2011.

The Company’s working capital decreased by $11.3 million between December 31, 2011 and June 30, 2012 to $201.5 million, compared to $212.9 million at December 31, 2011. The ratio of current assets to current liabilities was 1.75 to 1 at June 30, 2012 and was 1.84 to 1 at December 31, 2011. The decrease was primarily attributable to the $46.2 million reclassification of the 3.25% Convertible Senior Notes due March 2028 from non-current to current liabilities as a result of the holders' option to require the Company to repurchase the notes on March 15, 2013.

The Company intends to indefinitely reinvest a portion of its earnings from its Palmarejo operations in Mexico. Accordingly, U.S. and non-U.S. income and withholding taxes for which deferred taxes might otherwise be required, have not been provided on a cumulative amount of temporary differences (including, for this purpose, any difference between the tax basis in the stock of a consolidated subsidiary and the amount of the subsidiary’s net equity determined for financial reporting purposes) related to investments in foreign subsidiaries of approximately $170.0 million for the three and six months ended June 30, 2012 and the year ended December 31, 2011. The additional U.S. and non-U.S. income and withholding tax that would arise on the reversal of the temporary differences could be offset in part, by tax credits. Because the determination of the amount of available tax credits and the limitations imposed on the annual utilization of such credits are subject to a highly complex series of calculations and expense allocations, it is impractical to estimate the amount of net income and withholding tax that might be payable if a reversal of temporary differences occurred. The Company does not believe that the amounts permanently reinvested will have a material impact on liquidity.

### Cash Provided by Operating Activities

Net cash provided by operating activities in the three months ended June 30, 2012 was $113.2 million, compared with $111.1 million for the same time period in 2011. Net cash provided by operating activities in the six months ended June 30, 2012 was $130.2 million, compared to $146.9 million for the same time period in 2011.

Excluding changes in operating assets and liabilities, the Company’s operating cash flow consisted of the following:

*(In thousands)*

*(In thousands)*

|  | Three months ended June 30, 2012 | 2011 | Six months ended June 30, 2012 | 2011 |
| --- | ---: | ---: | ---: | ---: |
| CASH PROVIDED BY OPERATING ACTIVITIES | $113,203 | $111,065 | $130,204 | $146,850 |
| Changes in operating assets and liabilities: |  |  |  |  |
| Receivables and other current assets | (10,319) | 8,138 | (7,365) | 12,979 |
| Prepaid expenses and other | 2,857 | (1,354) | (1,916) | (1,335) |
| Inventories | (3,097) | 23,575 | 21,625 | 36,068 |
| Accounts payable and accrued liabilities | (14,276) | (25,585) | 39,655 | 11,392 |
| Operating cash flow | $88,368 | $115,839 | $182,203 | $205,954 |

### Cash Used in Investing Activities

Net cash used in investing activities in the three months ended June 30, 2012 was $37.4 million, compared to $34.5 million in the three months ended June 30, 2011. The increase was primarily the result of increased investment in capital. Net cash used in investing activities for the six months ended June 30, 2012 was $49.9 million, compared to $51.2 million in the six months ended June 30, 2011. The decrease is primarily due to proceeds from the sale of short term investment, offset by increased capital expenditures.

The Company spent $32.2 million on capital expenditures in the second quarter of 2012, compared with $25.8 million during the same time period last year. The majority of the capital expenditures in the second quarter were as follows: $11.2 million at Palmarejo for capitalized exploration drilling, development of the Guadalupe satellite underground mine and completion of the raised tailings dam at Palmarejo, $9.3 million at Kensington for underground development and final capital projects, and $7.8 million at San Bartolomé for tailings disposal improvements. The Company spent $63.9 million on capital expenditures in the six months ended June 30, 2012, compared with $41.7 million in the six months ended June 30, 2011. The majority of the capital expenditures for the first six months of 2012 were at Palmarejo, Kensington, and San Bartolomé.

### Cash Used in Financing Activities

Net cash used in financing activities during the three months ended June 30, 2012 was $28.3 million compared to $34.1 million for the same time period last year. Net cash used in financing activities during the six months ended June 30, 2012 was $55.9 million compared to $55.0 million for the same time period in 2011. During the three and six months ended June 30, 2012, the Company paid $28.1 million and $54.9 million, respectively, to settle existing debt and royalty obligations, primarily the Palmarejo gold production royalty. During the three and six months ended June 30, 2011, the Company paid $34.1 million and $81.2 million respectively, to settle existing debt.

### Debt and Capital Resources

### New Revolving Credit Facility

On August 1, 2012, Coeur Alaska, Inc. and Coeur Rochester, Inc. (the “Borrowers”), each a wholly-owned subsidiary of the Company, entered into a new Credit Agreement (the “Credit Agreement”) by and among the Company, the Borrowers, the lenders party thereto and Wells Fargo Bank, N.A., as administrative agent. The Credit Agreement provides for a senior secured revolving credit facility (the “Revolving Credit Facility”) in an aggregate principal amount of up to $100.0 million, which principal amount may be increased, subject to receiving additional commitments therefor, by up to $50.0 million.

The Credit Agreement will only become effective upon the satisfaction of the conditions precedent set forth therein, including the condition that the existing secured term loan facility with Coeur Alaska, Inc., as the borrower, the Company, as guarantor, Credit Suisse AG, as arranger, security agent, facility agent and lender, and Credit Suisse International, as hedge provider (the “Kensington Term Facility”), be repaid in full and terminated, and all of the liens granted thereunder be released. The Company expects that the Kensington Term Facility will be terminated and that the Revolving Credit Facility will become effective on or about August 16, 2012.

The term of the Revolving Credit Facility is four years. Amounts may be borrowed under the Revolving Credit Facility to finance working capital and general corporate purposes of the Company and its subsidiaries, including the payment of fees and expenses incurred in connection with the Revolving Credit Facility. The obligations under the Revolving Credit Facility will be secured by substantially all of the assets of the Company and its domestic subsidiaries, including the land, mineral rights and infrastructure at the Kensington and Rochester mines, as well as a pledge of the shares of certain of the Company's subsidiaries.

In addition, in connection with the Revolving Credit Facility, Coeur Alaska, Inc. intends to retain its existing hedge positions established under the Kensington Term Facility, with Wells Fargo Bank, N.A. as hedge provider.

Borrowings under the Revolving Credit Facility will bear interest at a rate selected by the Borrowers equal to either LIBOR plus a margin of 2.25%-3.25% or an alternate base rate plus a margin of 1.25%-2.25%, with the margin determined by reference to the Company's ratio of consolidated debt to adjusted EBITDA.

Voluntary prepayments of the loans and voluntary reductions of the unutilized portion of the commitments under the Revolving Credit Facility are permitted without prepayment premium or penalty, subject to payment of customary LIBOR breakage costs. Amounts so repaid may be re-borrowed subject to customary requirements.

The Revolving Credit Facility contains representations and warranties, events of default and affirmative and negative covenants that are usual and customary, including covenants that, among other things, restrict the ability of the Company and its subsidiaries to incur additional debt, incur or permit liens on assets, make investments and acquisitions, consolidate or merge with any other company, engage in asset sales and make dividends and distributions. The Revolving Credit Facility also contains financial covenants that require (i) our ratio of consolidated debt to adjusted EBITDA to be not greater than 3.25 to 1.00 (subject to a step-down to 3:00 to 1.00 after two years), (ii) our ratio of adjusted EBITDA to interest expense to be not less than 3.00 to 1.00 and (iii) our tangible net worth to be not less than 90% of our tangible net worth as of March 31, 2012 plus 25% of our net income for each fiscal quarter ending after March 31, 2012 to the date of measurement.

### 3.25% Convertible Senior Notes due 2028

As of June 30, 2012, the outstanding balance of the 3.25% Convertible Senior Notes was $48.7 million, or $46.8 million net of debt discount.

The carrying value of the equity component representing the embedded conversion option at June 30, 2012 and December 31, 2011 was $10.9 million.

Each holder of the notes may require that the Company repurchase some or all of the holder’s notes on March 15, 2013, March 15, 2015, March 15, 2018 and March 15, 2023 at a repurchase price equal to 100% of the principal amount of the notes to be repurchased, plus accrued and unpaid interest, in cash, shares of common stock or a combination of cash and shares of common stock, at the Company’s election. Holders will also have the right, following certain fundamental change transactions, to require the Company to repurchase all or any part of their notes for cash at a repurchase price equal to 100% of the principal amount of the notes to be repurchased plus accrued and unpaid interest. The Company may redeem the notes for cash in whole or in part at any time on or after March 22, 2015 at 100% of the principal amount of the notes to be redeemed plus accrued and unpaid interest.

The notes provide for “net share settlement” of any conversions. Pursuant to this feature, upon conversion of the notes, the Company (1) will pay the note holder an amount in cash equal to the lesser of the conversion obligation or the principal amount of the notes and (2) will settle any excess of the conversion obligation above the notes’ principal amount in the Company’s common stock, cash or a combination thereof, at the Company’s election.

The notes are convertible under certain circumstances, as defined in the indenture agreement, at the holder’s option, at an initial conversion rate of 17.60254 shares of the Company’s common stock per $1,000 principal amount of notes, which is equivalent to an initial conversion price of approximately $56.81 per share, subject to adjustment in certain circumstances.

### Kensington Term Facility

As of June 30, 2012 the balance of the Kensington Term Facility was $72.0 million.

As a condition to the Kensington Term Facility with Credit Suisse, the Company agreed to enter into a gold hedging program which protects a minimum of 243,750 ounces of gold production over the life of the facility against the risk associated with fluctuations in the market price of gold. This program consists of a series of zero cost collars which consist of a floor price and a ceiling price of gold. Collars protecting 111,000 ounces of gold call options were outstanding at June 30, 2012. The weighted average call feature of each collar was $1,971.94. Collars protecting 156,000 ounces of gold put options were outstanding at June 30, 2012. The weighted average strike price of the put options was $958.16. As noted above, the Company intends to retain its existing hedge positions with Wells Fargo Bank, N.A. as hedge provider.

The Kensington Term Facility contains affirmative and negative covenants that the Company believes are usual and customary, including financial covenants that Coeur Alaska’s debt to equity ratio shall not exceed 40%, the ratio of project cash flow to debt service shall be at least 125%, the tangible net worth of the Borrower is not less than $325 million and the tangible net worth of the Guarantor is no less than $1.0 billion. Project covenants include covenants as to performance of sales contracts, maintenance and management. As of June 30, 2012, the Company was not in compliance with the debt service ratio covenant.

The bank has waived that requirement of the agreement for the year ending December 31, 2012.

On August 1, 2012, the Company provided notice to repay the remaining amount outstanding under the Kensington Term Facility and a notice of termination of the facility, which termination is expected to become effective on August 16, 2012.

### Capital Lease Obligations

As of June 30, 2012 and December 31, 2011, the Company had outstanding balances on capital leases of $17.9 million and $27.0 million, respectively.

### Palmarejo Gold Production Royalty Obligation

The Company recognized accretion expense on the Palmarejo gold production royalty obligation of $5.6 million and $5.8 million for the three months ended June 30, 2012 and 2011, respectively, and $10.7 million and $11.0 million for the six months ended June 30, 2012 and 2011, respectively. As of June 30, 2012 and December 31, 2011, the remaining minimum obligation under the royalty agreement was $67.1 million and $72.1 million, respectively.

### Capitalized Interest

The Company capitalizes interest incurred on its various debt instruments as a cost of properties under development. For the three months ended June 30, 2012 and 2011, the Company capitalized interest of $0.6 million and $0.2 million, respectively. For the six months ended June 30, 2012 and 2011, the Company capitalized interest of $1.7 million and $0.4 million, respectively.

### Litigation and Other Events

For a discussion of litigation and other events, see Note 19 to the Company’s Condensed Consolidated Financial Statements, Litigation and Other Events.

## Market risk

As filed, 8,849 characters.

### Risk Mitigation Overview

The Company is exposed to various market risks as a part of its operations. In an effort to mitigate losses associated with these risks, the Company may, at times, enter into derivative financial instruments. These may take the form of forward sales contracts, foreign currency exchange contracts and interest rate swaps. The Company does not actively engage in the practice of trading derivative instruments for profit. This discussion of the Company’s market risk assessments contains “forward looking statements” that are subject to risks and uncertainties. Actual results and actions could differ materially from those discussed below.

The Company’s operating results are substantially dependent upon the world market prices of silver and gold. The Company has no control over silver and gold prices, which can fluctuate widely and are affected by numerous factors, such as supply and demand and investor sentiment. From time to time, in order to mitigate some of the risk associated with these fluctuations, the Company may enter into forward sale contracts. The Company continually evaluates the potential benefits of engaging in these strategies based on current market conditions. The Company may be exposed to nonperformance risk by counterparties as a result of its hedging activities. This exposure would be limited to the amount that the spot price of the metal falls short of the contract price. The Company enters into contracts and other arrangements from time to time in an effort to reduce the negative effect of price changes on its cashflows. These arrangements typically consist of managing the Company’s exposure to foreign currency exchange rates and market prices associated with changes in gold and silver commodity prices. The Company also may manage price risk by purchasing put options.

### Concentrate Sales Contracts

The Company enters into concentrate sales contracts with third-party smelters. The contracts, in general, provide for a provisional payment based upon provisional assays and quoted metal prices. The provisionally priced sales contain an embedded derivative that is required to be separated from the host contract for accounting purposes. The host contract is the receivable from the sale of concentrates at the forward price at the time of sale. The embedded derivative, which is the final settlement price based on a future price, does not qualify for hedge accounting. These embedded derivatives are recorded as derivative assets (in Prepaid expenses and other) or derivative liabilities (in Accrued liabilities and other) on the balance sheet and are adjusted to fair value through earnings each period until the date of final settlement. At June 30, 2012, the Company had outstanding provisionally priced sales of $20.2 million, consisting of 0.4 million ounces of silver and 5,698 ounces of gold, which had a fair value of $19.9 million including the embedded derivative. For each one cent per ounce change in realized silver price, revenue would vary (plus or minus) approximately $4,000; and for each one dollar per ounce change in realized gold price, revenue would vary (plus or minus) approximately $5,700. At December 31, 2011, the Company had outstanding provisionally priced sales of $22.5 million consisting of 0.2 million ounces of silver and 9,701 ounces of gold, which had a fair value of approximately $21.7 million including the embedded derivative. For each one cent per ounce change in realized silver price, revenue would vary (plus or minus) approximately $2,000 and for each one dollar per ounce change in realized gold price, revenue would vary (plus or minus)

approximately $9,700.

### Foreign Currency Contracts

The Company operates, or has mining interests, in several foreign countries, specifically Argentina, Australia, Bolivia and Mexico, which exposes the Company to risks associated with fluctuations in the exchange rates of the currencies involved. From time to time, as part of its program to manage foreign currency risk, the Company may enter into foreign currency forward exchange contracts. These contracts enable the Company to purchase a fixed amount of foreign currencies at pre-established exchange rates. Gains and losses on foreign exchange contracts that are related to firm commitments are designated and effective as hedges and are deferred and recognized in the same period as the related transaction. The Company has no outstanding firm commitments at June 30, 2012. All other contracts that do not qualify as hedges are marked to market and the resulting gains or losses are recorded in income. The Company continually evaluates the potential benefits of entering into these contracts to mitigate foreign currency risk and proceeds when it believes that the exchange rates are most beneficial.

The Company periodically enters into forward foreign currency contracts to reduce the foreign exchange risk associated with forecasted Mexican peso (“MXP”) operating costs at its Palmarejo mine. At June 30, 2012, the Company had MXP foreign exchange contracts of $26.1 million in U.S. dollars. These contracts require the Company to exchange U.S. dollars for MXP at a weighted average exchange rate of 13.37 MXP to each U.S. dollar and had a fair value of $(0.4) million at June 30, 2012. The Company recorded a mark-to-market gain of $0.1 million and a loss of $0.7 million for the three months ended June 30, 2012 and 2011, respectively. The Company recorded mark-to-market gains of $2.8 million and $0.3 million for the six months ended June 30, 2012 and 2011, respectively. The mark-to-market gains are reflected in fair value adjustments, net. A 10% weakening of the MXP would result in a reduction in fair value of $2.9 million. The Company recorded realized gains (losses) of $(1.2) million and $0.9 million in production costs applicable to sales during the three months ended June 30, 2012 and 2011, respectively. The Company recorded realized gains (losses) of $(1.9) million and $1.1 million in production costs applicable to sales during the six months ended June 30, 2012 and 2011, respectively.

### Palmarejo Gold Production Royalty

On January 21, 2009, the Company entered into the gold production royalty transaction with Franco-Nevada Corporation. The minimum royalty obligation ends when payments have been made on a total of 400,000 ounces of gold. As of June 30, 2012, a total of 224,710 ounces of gold remain outstanding under the minimum royalty obligation. The price volatility associated with the minimum royalty obligation is considered an embedded derivative financial instrument under U.S. GAAP. The fair value of the embedded derivative at June 30, 2012 and December 31, 2011 was a liability of $146.7 million and $159.4 million, respectively. During the three months ended June 30, 2012 and 2011, the mark-to-market adjustments for this embedded derivative amounted to a gain of $25.1 million and a loss of $4.0 million, respectively. During the six months ended June 30, 2012 and 2011, the mark-to-market adjustments for this embedded derivative amounted to a gain of $12.7 million and a loss of $2.9 million, respectively. For the three months ended June 30, 2012 and 2011, realized losses on settlement of the liabilities were $11.0 million and $9.7 million, respectively. For the six months ended June 30, 2012 and 2011, realized losses on settlement of the liabilities were $24.2 million and $17.2 million, respectively. The mark-to-market adjustments and realized losses are included in fair value adjustments, net in the consolidated statement of operations.

For each $1.00 increase in the price of gold, the fair value of the net derivative liability at June 30, 2012 would have increased by approximately $0.2 million. For each $1.00 decrease in the price of gold, the fair value of the net derivative liability at June 30, 2012 would have decreased by approximately $0.2 million.

### Kensington Term Facility

On June 30, 2012, in connection with the Kensington term facility, the Company had outstanding call options requiring it to deliver 111,000 ounces of gold at a weighted average strike price of $1,971.94 per ounce if the market price of gold exceeds the strike price. At June 30, 2012, the Company had outstanding put options allowing it to sell 156,000 ounces of gold at a weighted average strike price of $958.16 per ounce if the market price of gold were to fall below the strike price. The contracts will expire over the next four years. As of June 30, 2012 the fair market value of these contracts was a net liability of $13.2 million.

Additional information about the Company’s derivative financial instruments may be found in Note 15 to the Company’s Condensed Consolidated Financial Statements, Derivative Financial Instruments and Fair Value of Financial Instruments.

## Controls and procedures

As filed, 1,971 characters.

### (a) Disclosure Controls and Procedures

As of the end of the period covered by this quarterly report, the Company carried out an evaluation, under the supervision and with the participation of the Company’s management, including its Chief Executive Officer and Chief Financial Officer, of the effectiveness of the design and operation of the Company’s disclosure controls and procedures (as such term is defined in Rules 13a-15(e) and 15d-15(e) of the Securities Exchange Act of 1934 (the Exchange Act), and management necessarily applied its judgment in assessing the costs and benefits of such controls and procedures, which by their nature, can provide only reasonable assurance regarding management’s control objectives. The design of any system of controls is based in part upon certain assumptions about the likelihood of future events. Based upon the foregoing, the Company’s Chief Executive Officer and Chief Financial Officer concluded that the Company’s disclosure controls and procedures were effective and operating to provide reasonable assurance that information required to be disclosed by it in the reports it files or submits under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in the SEC’s rules and forms, and to provide reasonable assurance that such information is accumulated and communicated to the Company’s management, including its Chief Executive Officer and Chief Financial Officer, as appropriate to allow timely decisions regarding required disclosure.

### (b) Changes in Internal Control over Financial Reporting

Based on an evaluation by the Company’s Chief Executive Officer and Chief Financial Officer, such officers concluded that there was no change in the Company’s internal control over financial reporting during the quarter ended June 30, 2012 that has materially affected, or is reasonably likely to materially affect, the Company’s internal control over financial reporting.

## Risk factors

As filed, 43,620 characters.

***The Company's results of operations, cash flows and operating costs are highly dependent upon the market prices of silver and gold and other commodities, which are volatile and beyond our control. The Company's use of derivative contracts to protect against such volatility exposes us to risk of opportunity loss, mark-to-market accounting adjustments and exposure to counterparty credit risk.***

Silver and gold are commodities, and their prices are volatile. During the last twelve months ended June 30, 2012, the price of silver ranged from a low of $26.39 per ounce to a high of $43.82 per ounce, and the price of gold ranged from a low of $1,483.00 per ounce to a high of $1,895.00 per ounce. During the second quarter of 2012, the price of silver ranged from a low of $26.39 per ounce to a high of 33.21 per ounce, and the price of gold ranged from a low of $1,540.00 per ounce to a high of $1,677.50 per ounce. The closing market prices of silver and gold on August 6, 2012 were $27.91 per ounce and $1610 per ounce, respectively.

Silver and gold prices are affected by many factors beyond the Company's control, including prevailing interest rates and returns on other asset classes, expectations regarding inflation, speculation, currency values, governmental decisions regarding the disposal of precious metals stockpiles, global and regional demand and production, political and economic conditions and other factors. In addition, Exchange Traded Funds (“ETFs”), which have substantially facilitated the ability of large and small investors to buy and sell precious metals, have become significant holders of gold and silver.

Because the Company derives all of its revenues from sales of silver and gold, our results of operations and cash flows will fluctuate as the prices of these metals increase or decrease. A sustained period of declining gold and silver prices would materially and adversely affect the results of operations and cash flows. Factors that are generally understood to contribute to a decline in the prices of silver and gold include a strengthening of the U.S. dollar, net outflows from gold and silver ETFs, bullion sales by private and government holders and a general global economic slowdown.

In addition, operating costs at the Company's mines are affected by the price of input commodities, such as fuel, electricity, labor, chemical reagents, explosives, steel and concrete. Prices for these input commodities are volatile and can fluctuate due to conditions that are difficult to predict, including global competition for resources, currency fluctuations, consumer or industrial demand and other factors. Continued volatility in the prices of commodities and other supplies the Company purchases could lead to higher costs, which would adversely affect results of operations and cash flows.

From time to time, the Company may enter into price risk management contracts to protect against fluctuations in the price of its products and changes in the price of fuel and other input costs. These contracts could include forward sales or purchase contracts, futures contracts, purchased or sold put and call options and other contracts. Any such use of forward or futures contracts can expose us to risk of an opportunity loss. The use of derivative contracts may also result in significant mark-to-market accounting adjustments, which may have a material adverse impact on reported financial results. The Company is exposed to credit risk with contract counter-parties, including, but not limited to, sales contracts and derivative contracts. In the event of non-performance in connection with a contract, the Company could be exposed to a loss of value for that contract.

Since the beginning of 2011, the Company has made strategic minority investments in seven silver and gold development companies in North and South America. The value of these investments depends significantly on the market prices of silver and gold. The Company cannot assure that the value of these investments, or the value of future investments we may make in other development companies, will not decline. Declines in the value of these investments could adversely affect our financial condition.

***A substantial decline in gold and silver prices could cause one or more of our mining properties to become unprofitable, which could require the Company to record write-downs of long-lived assets that would adversely affect results of operations and financial condition.***

Established accounting standards for impairment of the value of long-lived assets such as mining properties requires us to review the recoverability of the cost of our assets by estimating the future undiscounted cash flows expected to result from the use and eventual disposition of the asset. Impairment, measured by comparing an asset's carrying value to its fair value, must be recognized when the carrying value of the asset exceeds these cash flows. A significant and sustained decline in silver or gold prices, or our failure to control production costs or realize the minable ore reserves at our mining properties, could lead the Company to terminate or suspend mining operations at one or more of its properties and require a write down the carrying value of the assets. Any such actions would negatively affect results of operations and financial condition.

The Company may record other types of additional mining property charges in the future if it sells a property for a price less than its carrying value or has to increase reclamation liabilities in connection with the closure and reclamation of a property. Any such additional write-downs of mining properties could adversely affect results of operations and financial condition.

***The Company is an international company and is exposed to political and social risks in the countries in which it has significant operations or interests.***

A majority of the Company's revenues are generated by operations outside the United States, and it is subject to significant risks inherent in resource extraction by foreign companies and contracts with government owned entities. Exploration, development, production and closure activities in many countries are potentially subject to heightened political and social risks that are beyond the Company's control. These risks include the possible unilateral cancellation or forced re-negotiation of contracts, unfavorable changes in foreign laws and regulations, royalty and tax increases, claims by governmental entities or indigenous communities, expropriation or nationalization of property and other risks arising out of foreign sovereignty over areas in which operations are conducted. The right to export silver and gold may depend on obtaining certain licenses and quotas, which could be delayed or denied at the discretion of the relevant regulatory authorities. In addition, the Company's rights under local law may be less secure in countries where judicial systems are susceptible to manipulation and intimidation by government agencies, non-governmental organizations or civic groups.

Any of these developments could require the Company to curtail or terminate operations at its mines, incur significant costs to meet newly-imposed environmental or other standards, pay greater royalties or higher prices for labor or services and recognize higher taxes, which could materially and adversely affect financial condition, results of operations and cash flows.

These risks may be higher in developing countries in which the Company may expand our exploration for and development of mineral deposits. Potential operations in these areas increase our exposure to risks of war, local economic conditions, political disruption, civil disturbance and governmental policies that may disrupt our operations.

***The Company's operations outside the United States also expose it to economic and operational risks.***

The Company's operations outside the United States also expose it to economic and operational risks. Local economic conditions can cause shortages of skilled workers and supplies, increase costs and adversely affect the security of operations. In addition, higher incidences of criminal activity and violence in the area of some of our foreign operations, including drug-cartel related violence in Mexico, could adversely affect the Company's ability to operate in an optimal fashion and may impose greater risks of theft and greater risks as to property security. These conditions could lead to lower productivity and higher costs, which would adversely affect results of operations and cash flows. The Company sells gold and silver doré in U.S. dollars, but it conducts operations outside the United States in local currency. Currency exchange movements could adversely affect results of operations.

### Silver and gold mining involves significant production and operational risks.

Silver and gold mining involves significant production and operational risks, including those related to uncertain mineral exploration success, unexpected geological or mining conditions, the difficulty of development of new deposits, unfavorable climate conditions, equipment or service failures, current unavailability of or delays in installing and commissioning plants and equipment, import or customs delays and other general operating risks. Commencement of mining can reveal mineralization or geologic formations, including higher than expected content of other minerals that can be difficult to separate from silver, which can result in unexpectedly low recovery rates.

Problems also may arise due to the quality or failure of locally obtained equipment or interruptions to services (such as power, water, fuel or transport or processing capacity) or technical support, which could result in the failure to achieve expected target dates for exploration, or could cause production activities to require greater capital expenditure to achieve expected recoveries.

Many of these production and operational risks are beyond the Company's control. Delays in commencing successful mining activities at new or expanded mines, disruptions in production and low recovery rates could have adverse effects on the Company's financial condition, results of operations and cash flows.

In late 2011, the Company temporarily reduced processing rates to complete several projects designed to improve long-term operational efficiency and consistency at the Kensington mine, including accelerated underground development, aggressive definition drilling of the ore body and completion of the underground paste backfill plant. There are no assurances that production at Kensington will achieve design capacity in the time periods the Company currently expects, or at all.

***The estimation of ore reserves is imprecise and depends upon subjective factors. Estimated ore reserves may not be realized in actual production. The Company's results of operations and financial position may be negatively affected by inaccurate estimates.***

The ore reserve figures presented in our public filings are estimates made by the Company's technical personnel and by independent mining consultants contracted by it. Reserve estimates are a function of geological and engineering analyses that require the Company to make assumptions about production costs, recoveries and silver and gold market prices. Reserve estimation is an imprecise and subjective process. The accuracy of such estimates is a function of the quality of available data and of engineering and geological interpretation, judgment and experience. Assumptions about silver and gold market prices are subject to great uncertainty as those prices have fluctuated widely in the past. Declines in the market prices of silver or gold may render reserves containing relatively lower grades of ore uneconomic to exploit, and the Company may be required to reduce reserve estimates, discontinue development or mining at one or more of its properties or write down assets as impaired. Should the Company encounter mineralization or geologic formations at any of its mines or projects different from those predicted, it may adjust our reserve estimates and alter its mining plans. Either of these alternatives may adversely affect actual production and financial condition, results of operations and cash flows.

***Forward sales and royalty arrangements can result in limiting the Company's ability to take advantage of increased metal prices while increasing its exposure to lower metal prices.***

The Company has in the past entered into, and may in the future enter into, arrangements under which it has agreed to make royalty or similar payments to lenders in amounts that are based on expected production and price levels for gold or silver. The Company enters into such arrangements when it concludes that they provide us with necessary capital to develop a specific mining property on favorable terms. Royalty or similar payment obligations, however, can limit our ability to realize the full effects of rising gold or silver prices and require the Company to make potentially significant cash payments if the mine fails to achieve specified minimum production levels.

***The Company's future operating performance may not generate cash flows sufficient to meet debt payment obligations.***

As of June 30, 2012, the Company had a total of approximately $350.5 million of outstanding indebtedness, which includes $213.8 million for future estimated gold production royalty payments due to Franco-Nevada Corporation, $72.0 million under the Kensington Term Facility, $46.8 million of 3.25% Convertible Senior Notes due 2028 (the “3.25% Convertible Senior Notes”) and capital lease obligations of $17.9 million. The liabilities associated with such royalty payments increase as the price of gold increases. The Company's ability to make scheduled debt payments on outstanding indebtedness will depend on future results of operations and cash flows. The Company's results of operations and cash flows, in part, are subject to economic factors beyond its control, including the market prices of silver and gold. The Company may not be able to generate enough cash flow to meet obligations and commitments. If the Company cannot generate sufficient cash flow from operations to service debt, it may need to further refinance debt, dispose of assets or issue equity to obtain the necessary funds. The Company cannot predict whether it would be able to refinance debt, issue equity or dispose of assets to raise funds on a timely basis or on satisfactory terms.

***The Company's future growth will depend upon its ability to develop new mines, either through exploration at existing properties or by acquisition from other mining companies.***

Because mines have limited lives based on proven and probable ore reserves, an important element of the Company's business strategy is the opportunistic acquisition of silver and gold mines, properties and businesses or interests therein. During 2011, the Company successfully constructed a new leach pad at our Rochester mine and substantially completed development of other major mining properties at Palmarejo, San Bartolomé, and Kensington. The Company's ability to achieve significant additional growth in revenues and cash flows will depend upon success in further developing existing properties and developing or acquiring new mining properties. Both strategies are inherently risky, and the Company cannot assure that it will be able to successfully compete in either the development of existing or new mining properties or acquisitions of additional mining properties.

While it is the Company's practice to engage independent mining consultants to assist in evaluating and making acquisitions, any mining properties or interests that it may acquire may not be developed profitably. If profitable when acquired, that profitability might not be sustained. In connection with any future acquisitions, the Company may incur indebtedness or issue equity securities, resulting in increased interest expense, or dilution of the percentage ownership of existing shareholders. The Company cannot predict the impact of future acquisitions on the price of its business or common stock or that it would be able to obtain any necessary financing on acceptable terms. Unprofitable acquisitions, or additional indebtedness or issuances of securities in connection with such acquisitions, may negatively affect results of operations.

In addition, since the beginning of 2011, the Company has also made strategic minority investments in seven silver and gold development companies in North and South America. As of June 30, 2012, our investments in seven of these companies had an estimated fair value of $21.2 million. Subsequent to June 30, 2012, the Company agreed to invest an additional $2.0 million in one of these companies. The Company cannot assure that the value of these investments, or the value of future investments it may make in other development companies, will not decline. Declines in the value of these investments could adversely affect financial condition.

***Mineral exploration and development inherently involves significant and irreducible financial risks. The Company may suffer from the failure to find and develop profitable mines.***

The exploration for and development of mineral deposits involves significant financial risks that even a combination of careful evaluation, experience and knowledge cannot eliminate. Unprofitable efforts may result from the failure to discover mineral deposits. Even if mineral deposits are found, those deposits may be insufficient in quantity and quality to return a profit from production, or it may take a number of years until production is possible, during which time the economic viability of the project may change. Few properties which are explored are ultimately developed into producing mines.

Substantial expenditures are required to establish ore reserves, to extract metals from ores and, in the case of new properties, to construct mining and processing facilities. The economic feasibility of any development project is based upon, among other things, volatile metals prices, estimates of the size and grade of ore reserves, proximity to infrastructures and other resources such as water and power, metallurgical recoveries, production rates and capital and operating costs. Development projects also are subject to the completion of favorable feasibility studies, issuance and maintenance of necessary permits and receipt of adequate financing.

The commercial viability of a mineral deposit, once developed, depends on a number of factors, including: the particular attributes of the deposit, such as size, grade and proximity to infrastructure; government regulations including taxes, royalties and land tenure; land use; importing and exporting of minerals; environmental protection; and mineral prices. Factors that affect adequacy of infrastructure include: reliability of roads, bridges, power sources and water supply; unusual or infrequent weather phenomena; sabotage; and government or other interference in the maintenance or provision of such infrastructure. All of these factors are highly cyclical. The exact effect of these factors cannot be accurately predicted, but the combination may result in not receiving an adequate return on invested capital.

***Significant investment risks and operational costs are associated with exploration, development and mining activities. These risks and costs may result in lower economic returns and may adversely affect the Company's business.***

The Company's ability to sustain or increase our present production levels depends in part on successful exploration and development of new ore bodies and expansion of existing mining operations. Mineral exploration, particularly for silver and gold, involves many risks and is frequently unproductive. The economic feasibility of any development project is based upon, among other things, estimates of the size and grade of ore reserves, proximity to infrastructures and other resources (such as water and power), metallurgical recoveries, production rates and capital and operating costs of such development projects, and metals prices. Development projects are also subject to the completion of favorable feasibility studies, issuance and maintenance of necessary permits and receipt of adequate financing.

Development projects may have no operating history upon which to base estimates of future operating costs and capital requirements. Development project items such as estimates of reserves, metal recoveries and cash operating costs are to a large extent based upon the interpretation of geologic data, obtained from a limited number of drill holes and other sampling techniques, and feasibility studies. Estimates of cash operating costs are then derived based upon anticipated tonnage and grades of ore to be mined and processed, the configuration of the ore body, expected recovery rates of metals from the ore, comparable facility and equipment costs, anticipated climate conditions and other factors.

As a result, actual cash operating costs and economic returns of any and all development projects may materially differ from the costs and returns estimated, and accordingly, the Company's financial condition, results of operations and cash flows may be negatively affected.

### The Company might be unable to raise additional financing necessary to meet capital needs, conduct business, make payments

### when due or refinance debt.

The Company might need to raise additional funds in order to meet capital needs, implement its business plan, refinance debt or acquire complementary businesses or products. Any required additional financing might not be available on commercially reasonable terms, or at all. If the Company raises additional funds by issuing equity securities, holders of its common stock could experience significant dilution of their ownership interest, and these securities could have rights senior to those of the holders of common stock.

***A significant delay or disruption in sales of concentrates as a result of the unexpected discontinuation of purchases by smelter customers could have a material adverse effect on operations.***

The Company currently markets silver and gold concentrates to third-party smelters and refineries in Mexico, Germany, China, and Australia. The loss of any one smelter could have a material adverse effect on the Company if alternative smelters and refineries were unavailable. The Company cannot assure you that alternative smelters or refineries would be available if the need for them were to arise or that it would not experience delays or disruptions in sales that would materially and adversely affect results of operations.

***The Company's silver and gold production may decline in the future, reducing our results of operations and cash flows.***

The Company's silver and gold production, unless it is able to develop or acquire new properties, will decline over time due to the exhaustion of reserves and the possible closure of mines in response to declining metals prices or other factors. Identifying promising mining properties is difficult and speculative. The Company encounters strong competition from other mining companies in connection with the acquisition of properties producing or capable of producing silver and gold. Many of these companies have greater financial resources than the Company does. Consequently, the Company may be unable to replace and expand current ore reserves through the acquisition of new mining properties or interests therein on terms that are considered acceptable. As a result, revenues from the sale of silver and gold may decline, resulting in lower income and reduced growth. The Company cannot assure that it would be able to replace the production that would be lost due to the exhaustion of reserves and the possible closure of mines.

***There are significant hazards associated with mining activities, some of which may not be fully covered by insurance.***

The mining business is subject to risks and hazards, including environmental hazards, industrial accidents, the encountering of unusual or unexpected geological formations, cave-ins, flooding, earthquakes and periodic interruptions due to inclement or hazardous weather conditions. These occurrences could result in damage to, or destruction of, mineral properties or production facilities, personal injury or death, environmental damage, reduced production and delays in mining, asset write-downs, monetary losses and possible legal liability. Insurance fully covering many environmental risks, including potential liability for pollution or other hazards as a result of disposal of waste products occurring from exploration and production, is not generally available to us or to other companies in the industry. Any liabilities that the Company incurs for these risks and hazards could be significant and could adversely affect results of operation, cash flows and financial condition.

***The Company is subject to significant governmental regulations, including under the Federal Mine Safety and Health Act, and related costs and delays may negatively affect its business.***

Mining activities are subject to extensive federal, state, local and foreign laws and regulations governing environmental protection, natural resources, prospecting, development, production, post-closure reclamation, taxes, labor standards and occupational health and safety laws and regulations, including mine safety, toxic substances and other matters. The costs associated with compliance with such laws and regulations are substantial. Possible future laws and regulations, or more restrictive interpretations of current laws and regulations by governmental authorities, could cause additional expense, capital expenditures, restrictions on or suspensions of operations and delays in the development of new properties.

U.S. surface and underground mines like the Kensington and Rochester mines are continuously inspected by the U.S. Mine Safety and Health Administration (“MSHA”), which inspections often lead to notices of violation. Recently, the MSHA has been conducting more frequent and more comprehensive inspections. In addition, the MSHA is currently evaluating whether to assess any fines or penalties in connection with the accidental death of a blaster's assistant at the Kensington mine on September 7, 2011. Although the Company does not believe it was at fault, it cannot assure that the MSHA will agree and will not assess fines or penalties, which may be material.

Failure to comply with applicable laws, regulations and permitting requirements may result in enforcement actions, including orders issued by regulatory or judicial authorities causing operations to cease or be curtailed, which may require corrective measures including capital expenditures, installation of additional equipment or remedial actions. In addition, any of our U.S. mines could be subject to a temporary or extended shut down as a result of a violation alleged by the MSHA. Parties engaged in mining operations or in the exploration or development of mineral properties may be required to compensate those suffering loss or damage by reason of the mining activities and may be subject to civil or criminal fines or penalties imposed for violations of applicable laws or regulations. Any such penalties, fines, sanctions or shutdowns could have a material adverse effect on the Company's business and results of operations.

***Compliance with environmental regulations and litigation based on environmental regulations could require significant expenditures.***

Environmental regulations mandate, among other things, the maintenance of air and water quality standards and land reclamation, and set forth limitations on the generation, transportation, storage and disposal of solid and hazardous waste. Environmental legislation is evolving in a manner that will require stricter standards and enforcement, increased fines and penalties for non-compliance, more stringent environmental assessments of proposed projects, and a heightened degree of responsibility for mining companies and their officers, directors and employees. The Company may incur environmental costs that could have a material adverse effect on financial condition and results of operations. Any failure to remedy an environmental problem could require it to suspend operations or enter into interim compliance measures pending completion of the required remedy. The environmental standards that ultimately may be imposed at a mine site affect the cost of remediation and could exceed the financial accruals that the Company has made for such remediation. The potential exposure may be significant and could have a material adverse effect on the Company's financial condition and results of operations.

Moreover, governmental authorities and private parties may bring lawsuits based upon damage to property and injury to persons resulting from the environmental, health and safety impacts of prior and current operations, including operations conducted by other mining companies many years ago at sites located on properties that the Company currently or formerly owned. These lawsuits could lead to the imposition of substantial fines, remediation costs, penalties and other civil and criminal sanctions. Substantial costs and liabilities, including for restoring the environment after the closure of mines, are inherent in our operations. The Company cannot assure that any such law, regulation, enforcement or private claim would not have a negative effect on its financial condition, results of operations or cash flows.

Some of the Company's mining wastes currently are exempt to a limited extent from the extensive set of federal Environmental Protection Agency (the “EPA”) regulations governing hazardous waste under the Resource Conservation and Recovery Act (“RCRA”). If the EPA designates these wastes as hazardous under RCRA, the Company would be required to expend additional amounts on the handling of such wastes and to make significant expenditures to construct hazardous waste disposal facilities. In addition, if any of these wastes causes contamination in or damage to the environment at a mining facility, that facility could be designated as a “Superfund” site under the Comprehensive Environmental Response, Compensation and Liability Act (“CERCLA”). Under CERCLA, any present owner or operator of a Superfund site or the owner or operator at the time of contamination may be held liable and may be forced to undertake extensive remedial cleanup action or to pay for the government's cleanup efforts. The owner or operator also may be liable to governmental entities for the cost of damages to natural resources, which could be substantial. Additional regulations or requirements also are imposed on our tailings and waste disposal areas in Alaska under the federal Clean Water Act (“CWA”) and in Nevada under the Nevada Water Pollution Control Law which implements the CWA.

Airborne emissions are subject to controls under air pollution statutes implementing the Clean Air Act in Nevada and Alaska. In addition, there are numerous legislative and regulatory proposals related to climate change, including legislation pending in the U.S. Congress to require reductions in greenhouse gas emissions. Adoption of these proposals could have a materially adverse effect on results of operations and cash flows.

***We rely on third parties to operate, maintain and produce silver for us at the Endeavor mine.***

The Endeavor mine is owned, maintained and operated by Cobar Operations Pty. Limited (“Cobar”), a wholly-owned subsidiary of CBH Resources Ltd. (“CBH”). However, pursuant to a silver sale and purchase agreement, the Company's wholly-owned subsidiary, CDE Australia Pty. Ltd. (“CDE Australia”), has acquired all silver production and reserves at the Endeavor mine, up to a total of 20.0 million payable ounces. CDE Australia has agreed to pay Cobar an operating cost contribution of $1.00 for each ounce of payable silver plus 50% of the amount by which the silver price exceeds $7.00 per ounce, subject to annual adjustments for inflation.

Under this arrangement, the Company relies on Cobar to own, maintain and operate the Endeavor mine, which exposes it to substantial counterparty risk. Cobar may fail to adequately or appropriately operate or maintain the project or may fail to fulfill its other obligations under the silver purchase agreement. The Company cannot assure that Cobar will not suffer financial hardship, that it will continue as a going concern or that it will not enter bankruptcy or otherwise liquidate. Any such event could expose the Company to significant costs and could limit the amounts, if any, it could recover in any proceeding against CBH or Cobar for breach of the silver purchase agreement. Any failure, inability or refusal of Cobar to meet its obligations to the Company could have a material and adverse effect on our business, results of operations or financial condition.

***The Company's ability to obtain necessary government permits to expand operations or begin new operations can be materially affected by third party activists.***

Private parties such as environmental activists frequently attempt to intervene in the permitting process and to persuade regulators to deny necessary permits or seek to overturn permits that have been issued. Obtaining the necessary governmental permits is a complex and time-consuming process involving numerous jurisdictions and often involving public hearings and costly undertakings. These third party actions can materially increase the costs and cause delays in the permitting process and could cause the Company to not proceed with the development or expansion of a mine.

An environmental organization, Great Basin Resource Watch (“GRBW”) has brought an administrative appeal challenging the Bureau of Land Management's approval of a plan of amendment which allows active mining to be resumed and a new heap leach pad to be constructed at the Rochester property. The Interior Board of Land Appeals (“IBLA”) is expected to rule on the appeal in 2012. However, because GRBW did not seek a stay of the BLM's decision, operations have been proceeding as approved during the IBLA proceeding. The Company cannot predict the outcome of the appeal or what effect, if any, an adverse ruling may have on current operations. If an adverse ruling is issued, the Company may be required to update the permitting for the current operations at Rochester.

### The Company's operations in Bolivia are subject to political risks.

The Bolivian government adopted a new constitution in early 2009 that strengthened state control over key economic sectors such as mining. In connection with the 2009 constitution, the government of Bolivia announced a restructuring of the mining law. A commission was established in March 2011 to finalize the mining law updates and the commission's evaluation remains ongoing. The Company has been assessing the potential effects of the proposed legislation on our Bolivian operations but any effects remain uncertain until the law is enacted. The law is expected to regulate taxation and royalties and to provide for contracting with the government rather than concession holding. The revised mining law is expected to be enacted in 2012. The Company cannot assure that our operations at the San Bartolomé mine will not be affected in the current political environment in Bolivia.

On October 14, 2009, the Bolivian state-owned mining company, Corporación Minera de Bolivia (“COMIBOL”), announced by resolution that it was temporarily suspending mining activities above the elevation of 4,400 meters above sea level while stability studies of the Cerro Rico mountain are undertaken. The Company holds rights to mine above this elevation under valid contracts with COMIBOL as well as under authorized contracts with local mining cooperatives that hold their rights under contract themselves with COMIBOL. The Company temporarily adjusted its mine plan to confine mining activities to the ore deposits below 4,400 meters above sea level and timely notified COMIBOL of the need to lift the restriction. The Cooperative Reserva Fiscal, with which the Company has one of those contracts, subsequently interpreted the COMIBOL resolution and determined that the Huacajchi deposit was not covered by such resolution. In March 2010, the Cooperative Reserva Fiscal notified COMIBOL that, based on its interpretation, it was resuming mining of high grade material above the 4,400 meter level in the Huacajchi deposit. In December 2011, the Cooperative Reserva Fiscal sent a similar notification to COMIBOL with respect to a further area above the 4,400 meter level known as Huacajchi Sur. Based on these notifications and on the absence of any objection from COMIBOL, the Company resumed mining operations at the San Bartolomé mine on the Huacajchi deposit and Huacajchi Sur. Mining in other areas above the 4,400 meter level continue to be suspended. The partial suspension may reduce production until the Company is able to resume mining above 4,400 meters generally. It is uncertain at this time how long the suspension will remain in place. In addition, it is possible that COMIBOL may decide that the Company's operations at the Huacajchi deposit or Huacajchi Sur are subject to the COMIBOL resolution, which may force us to cease mining at such deposits. If COMIBOL objects to the Company mining at the Huacajchi deposit or Huacajchi Sur or if the other restrictions are not lifted, it may need to write down the carrying value of the asset. It is also uncertain if any new mining or investment policies or shifts in political attitude may affect mining in Bolivia.

### The Company's business depends on good relations with our employees.

The Company could experience labor disputes, work stoppages or other disruptions in production that could adversely affect our business and results of operations. Labor disruptions may be used to advocate labor, political or social goals, particularly at non-U.S. mines. For example, labor disruptions may occur in sympathy with strikes or labor unrest in other sectors of local economies. During the past three years, two of the Company's mines have experienced work stoppages, each of which was resolved within a short period of time and had no material effect on operations. Most recently, in May 2012, a small, unorganized group of employees at the Palmarejo mine blocked access to the mine. Palmarejo management supervised an orderly, temporary shut-down of the mine and mill in order to allow for dialogue with employees while ensuring the safety of workers at the mine site. Management considered the actions taken by the group to be illegal. Within approximately five days, the group agreed to return to work and full production resumed at the mine. The Company cannot assure that work stoppages or other disruptions will not occur in the future. Any such work stoppage or disruption could expose the Company to significant costs and have a material and adverse effect on its business, results of operations or financial condition.

As of June 30, 2012, unions represented approximately 11% of our worldwide workforce. We currently have a collective bargaining agreement covering the Martha mine, which expires on December 31, 2012, and a labor agreement at our San Bartolomé mine, which became effective October 11, 2007 and does not have a fixed term. We cannot predict whether these agreements will be renewed, whether future labor disruptions will occur or, if disruptions do occur, how long they will last.

***Third parties may dispute the Company's unpatented mining claims, which could result in the discovery of defective titles and losses affecting its business.***

The validity of unpatented mining claims, which constitute a significant portion of the Company's property holdings in the United States, is often uncertain and may be contested. Although the Company has attempted to acquire satisfactory title to undeveloped properties, in accordance with mining industry practice it does not generally obtain title opinions until a decision is made to develop a property. As a result, some titles, particularly titles to undeveloped properties may be defective. Defective title to any of the Company's mining claims could result in litigation, insurance claims and potential losses affecting its business as a whole.

Coeur Rochester, Inc. (“Coeur Rochester”), the Company's wholly-owned subsidiary, is party to a legal action relating to a third party's assertion of rights to unpatented mining claims at and near the Rochester property in Nevada. Coeur Rochester held 541 U.S. Federal unpatented claims through August 2011. On September 1, 2011, the Company inadvertently missed a claims fee payment to the U.S. Bureau of Land Management (“BLM”) and as a result the prior unpatented mining claims were forfeited. The Company re-staked 479 claims in early December 2011 and filed notices with Pershing County, Nevada and the BLM. The new claims cover the majority of the prior unpatented claim area. A third party asserts that it also staked and filed notices on the Company's original unpatented mining claims. The Company believes it holds a superior property interest to the adverse staking party and filed a lawsuit to quiet title in the claims. The mine operates under an approved BLM plan of operations and has continued normal operations while the legal action is pending. The Company believes there would be no effect on the current silver and gold reserves at Coeur Rochester assuming an adverse outcome. However, the Company does believe an adverse outcome would require it to modify existing plans to further expand future mining operations and would require permits to be updated to reflect changes in claim ownership.

There may be challenges to the title of any of the claims comprising the Company's mines that, if successful, could impair development and operations. A defect could result in the Company losing all or a portion of its right, title, estate and interest in and to the properties to which the title defect relates.

***The Company has the ability to issue additional equity securities, which would lead to dilution of its issued and outstanding common stock and may materially and adversely affect the price of its common stock.***

The issuance of additional equity securities or securities convertible into equity securities would result in dilution of the Company's existing shareholders' equity ownership. The Company is authorized to issue, without shareholder approval, 10,000,000 shares of preferred stock in one or more series, to establish the number of shares to be included in each series and to fix the designation, powers, preferences and relative participating, optional, conversion and other special rights of the shares of each series as well as the qualification, limitations or restrictions on each series. Any series of preferred stock could contain dividend rights, conversion rights, voting rights, terms of redemption, redemption prices, liquidation preferences or other rights superior to the rights of holders of its common stock. If the Company issues additional equity securities, the price of its common stock may be materially and adversely affected.

Filed Aug 7, 2012.
Source: SEC EDGAR, the filing index for accession 0000215466-12-000021. Last ingested by Listed: Nov 14, 2026, 12:15 ET. No prices; not investment advice.