# Coeur Mining, Inc.: Form 10-Q for the period ended Mar 31, 2013

- Company: [Coeur Mining, Inc.](/companies/cde.md) (CIK 215466)
- Form: 10-Q
- Filed: 2013-05-09
- Accepted by EDGAR: May 9, 2013, 14:11 ET
- Period: 2013-03-31
- Accession: 0000215466-13-000076
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/215466/000021546613000076/cde-03312013xq1.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/215466/000021546613000076/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2013-03-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2013-01-01 to 2013-03-31 | $171.8m | us-gaap:SalesRevenueGoodsNet |
| Cost of revenue | 3 months, 2013-01-01 to 2013-03-31 | $88.8m | us-gaap:CostOfGoodsSold |
| Gross profit | 3 months, 2013-01-01 to 2013-03-31 | $32.6m | us-gaap:GrossProfit |
| Operating income | 3 months, 2013-01-01 to 2013-03-31 | $10.9m | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2013-01-01 to 2013-03-31 | $9.7m | us-gaap:InterestExpense |
| Income tax | 3 months, 2013-01-01 to 2013-03-31 | $10.5m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2013-01-01 to 2013-03-31 | $12.3m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2013-01-01 to 2013-03-31 | $0.14 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2013-01-01 to 2013-03-31 | $0.14 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2013-01-01 to 2013-03-31 | 90,036,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months, 2013-01-01 to 2013-03-31 | $12.9m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 3 months, 2013-01-01 to 2013-03-31 | $12.8m | us-gaap:PaymentsToAcquireProductiveAssets |
| Share repurchases | 3 months, 2013-01-01 to 2013-03-31 | $12.6m | us-gaap:PaymentsForRepurchaseOfCommonStock |
| Cash and equivalents | at 2013-03-31 | $331.3m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2013-03-31 | $637.4m | us-gaap:AssetsCurrent |
| Total assets | at 2013-03-31 | $3.42bn | us-gaap:Assets |
| Current liabilities | at 2013-03-31 | $155.4m | us-gaap:LiabilitiesCurrent |
| Current portion of debt | at 2013-03-31 | $6.1m | us-gaap:DebtCurrent |
| Shareholders' equity | at 2013-03-31 | $2.20bn | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 59,832 characters.

Management’s Discussion and Analysis of Financial Condition and Results of Operations (“MD&A”) is designed to provide the reader of the Company's financial statements with a narrative from management’s perspective on its financial condition, results of operations, liquidity and other factors that may affect our future results. The Company believes it is important to read its MD&A in conjunction with its Annual Report on Form 10-K for the year ended December 31, 2012 (the "2012 10-K"), as well as other publicly available information.

This report contains numerous forward-looking statements relating to the Company’s gold and silver mining business, including estimated production data, expected operating schedules, results of operations, ore reserves and resources, expected capital costs and other expected operating data and permit and other regulatory approvals. Such forward-looking statements are identified by the use of words such as “believes,” “intends,” “expects,” “hopes,” “may,” “should,” “will,” “plan,” “projected,” “contemplates,” “anticipates” or similar words. Actual production, operating schedules, results of operations, ore reserves and resources, capital costs and permit and regulatory approvals could differ materially from those projected in the forward-looking statements. The factors that could cause actual results to differ materially from those in the forward-looking statements include: (i) the risk factors set forth below under Part II, Item 1A and in the "Risk Factors" section of the 2012 10-K and the risks and uncertainties discussed in this MD&A; (ii) risks and hazards inherent in the mining business (including environmental hazards, industrial accidents, weather or geologically related conditions); (iii) changes in the market prices of gold and silver; (iv) uncertainties inherent in the Company’s production, exploratory and developmental activities, including risks relating to permitting and regulatory delays and disputed mining claims; (v) any future labor disputes or work stoppages; (vi) uncertainties inherent in the estimation of gold and silver ore reserves; (vii) changes that could result from the Company’s future acquisition of new mining properties or businesses; (viii) reliance on third parties to operate certain mines where the Company owns silver production and reserves; (ix) the loss of any third-party smelter to which the Company markets silver and gold; (x) effects of environmental and other governmental regulations; (xi) risks inherent in the ownership or operation of or investment in mining properties or businesses in foreign countries; (xii) the worldwide economic downturn and difficult conditions in the global capital and credit markets; and (xiii) the Company’s possible inability to raise additional financing necessary to conduct its business, make payments or refinance its debt. Readers are cautioned not to put undue reliance on forward-looking statements. The Company disclaims any intent or obligation to update publicly these forward-looking statements, whether as a result of new information, future events or otherwise.

#### Non-U.S. GAAP Measures

We supplement the reporting of our financial information determined under United States generally accepted accounting principles (U.S. GAAP) with certain non-U.S. GAAP financial measures, including cash operating costs, total cash costs, and operating cash flow. We believe that these adjusted measures provide meaningful information to assist management, investors and analysts in understanding our financial results and assessing our prospects for future performance. We believe these adjusted financial measures are important indicators of our recurring operations because they exclude items that may not be indicative of, or are unrelated to our core operating results, and provide a better baseline for analyzing trends in our underlying businesses. We believe cash operating costs and operating cash flow are important measures in assessing the Company's overall financial performance.

#### Introduction to the Company

The Company is a large primary silver producer with growing gold production and has assets located in the United States, Mexico, Bolivia, Argentina and Australia. The Palmarejo mine, San Bartolomé mine, Kensington mine, and Rochester mine , each of which is operated by the Company, and the Endeavor mine, which is operated by a non-affiliated party, constituted the Company’s principal sources of mining revenues during the first three months of 2013.

The Company’s business strategy is to discover, acquire, develop and operate low-cost silver and gold operations that it expects to produce long-term cash flow, provide opportunities for growth through continued exploration, and generate superior and sustainable returns for shareholders. The Company’s management focuses on maximizing cash flow from its existing operations, the main elements of which are silver and gold prices, cash costs of production and capital expenditures. The Company also focuses on controlling its non-operating costs in order to maximize cash flow.

The results of the Company’s operations are significantly affected by the prices of silver and gold, which may fluctuate widely and are affected by numerous factors beyond the Company’s control, including interest rates, expectations regarding inflation, currency values, governmental decisions regarding the disposal of precious metals stockpiles, global and regional political and economic conditions and other factors. In addition, the Company faces challenges including raising capital, increasing production and managing social, political and environmental issues. Operating costs at its mines are subject to variation due to a number of factors such as changing commodity prices, ore grades, metallurgy, revisions to mine plans and changes in accounting principles. At foreign locations, operating costs are also influenced by currency fluctuations that may affect the Company’s U.S. dollar costs.

### Overview of Performance

### Production

In the first quarter of 2013, the Company’s total silver production decreased 21.5% to 3.8 million ounces as compared to 4.9 million ounces in the comparable period in 2012. The decrease is primarily due to decreased production at the Palmarejo and San Bartolomé mines. The decrease at Palmarejo was the result of lower grade ore processed from both open pit and underground operations compared to the same time period in 2012. The reduction at San Bartolomé was due to lower silver ore grades. The Company’s total gold production in the first quarter of 2013 increased by 13,012 ounces, or 29.6%, to 56,913 ounces, as compared to 43,901 ounces in the comparable period in 2012. The increase was primarily driven by increased gold production at the Kensington mine.

### Sales of Metal

Sales of metal decreased $32.8 million, or 16.0%, to $171.8 million in the first quarter of 2013, compared to $204.6 million in the first quarter of 2012, primarily due to lower silver and gold prices and the production decreases at the Palmarejo and San Bartolomé mines. The Company sold 3.1 million ounces of silver and 51,926 ounces of gold during the first quarter compared to 4.3 million ounces of silver and 38,884 ounces of gold in the comparable period of 2012. The Company’s average realized silver and gold prices during the first quarter of 2013 were $30.30 per ounce and $1,630 per ounce, respectively, representing a decrease of 7.1% and 4.2%, respectively, over last year’s first quarter. Sales of silver contributed 53.4% of the Company’s total metal sales during the first quarter of 2013, compared to 68.1% during the first quarter of 2012.

### Earnings

The Company reported net income of $12.3 million, or $0.14 per share, compared to net income of $4.0 million, or $0.04 per share, for the three months ended March 31, 2013 and 2012, respectively. The earnings reflect non-cash fair value adjustments that increased net income by $17.8 million and decreased net income by $23.1 million in the three months ended March 31, 2013 and 2012, respectively. These fair value adjustments are driven primarily by changing forward gold prices which impact the estimated future liabilities related to the Palmarejo gold production royalty obligation.

Production costs decreased by $3.8 million or 4.1% for the three months ended March 31, 2013 compared to the same time period in 2012. The decrease was due primarily to a lower volume of ounces sold when compared to the same time period during 2012.

Depreciation, depletion, and amortization decreased by $2.2 million or 4.1% for the three months ended March 31, 2013 compared to the same time period in 2012 as a result of decreased depletion at Palmarejo due to a decrease in volume.

Administrative and general expenses increased by $2.6 million or 34.6% during the three months ended March 31, 2013 compared to the same time period in 2012. The increase was primarily due to increased legal and finance related expense and salaries and relocation costs for new employees.

Exploration expense increased by $0.3 million or 4.2% for the three months ended March 31, 2013 compared to the same time period in 2012 as a result of increased exploration activity at the Palmarejo, Kensington and Rochester mines, and at the Joaquin and Lejano projects.

Pre-development, care, maintenance and other expenses increased by $3.4 million or 319.9% during the three months ended March 31, 2013 compared to the same time period in 2012. The increase was primarily the result of the Company's settlement of a royalty right in Bolivia.

Interest expense increased $3.1 million or 45.9% during the three months ended March 31, 2013 as compared to the same period in 2012, primarily due to an increase in total debt outstanding as a result of issuing the 7.875% Senior Notes.

### Other Highlights

In addition to the matters discussed above regarding the key elements of the Company’s business strategy, the matters management considers most important in evaluating the Company’s financial condition and results of operations include:

- The average price of silver (Handy & Harman) and gold (London Gold PM) for the three months ended March 31, 2013 was $30.08 and $1,631 per ounce, respectively, compared to $32.72 and $1,691 per ounce, respectively, for the three months ended March 31, 2012. The closing market price of silver and gold on May 8, 2013 was $23.75 per ounce and $1,468 per ounce, respectively.
- Net cash provided by operating activities for the first quarter of 2013 was $12.9 million, compared to $17.0 million during the first quarter of 2012. The reduction was primarily the result of lower sales during the quarter.
- The Company spent $12.8 million on capital expenditures in the first quarter of 2013, which is $18.8 million lower than the same time period last year. Capital expenditures in the first quarter were primarily related to capitalized drilling and development of the Guadalupe satellite underground mine; underground development at Palmarejo, underground development at Kensington, and the stage 3 leach pad, metal removal system, and crusher at Rochester.
- The Company’s ratio of current assets to current liabilities was 4.10 to 1 at March 31, 2013, compared to 1.70 to 1 at December 31, 2012.

### Operating Highlights and Statistics

### Palmarejo Mine:

Production during the first quarter of 2013 was 1.6 million ounces of silver, which represented a 33.7% decrease compared to the first quarter of 2012. Gold production was 22,965 ounces, which represented a 26.1% decrease from the first quarter of 2012. The reduced production was primarily the result of lower grade ore processed from both open pit and underground operations compared to the same time period in 2012.

Cash operating costs and total cash costs per silver ounce during the first quarter increased to $2.20 compared to $(2.27) for the first quarter of 2012. Higher cash operating costs per ounce were due to decreased production, increased mining costs for additional ground support, increased maintenance costs and lower gold by-product credits as a result of lower gold production. Production costs applicable to sales for the three months ended March 31, 2013 decreased by 41.7% compared to the same time period in 2012 due primarily to a lower volume of ounces sold.

### San Bartolomé Mine:

Silver production for the first quarter of 2013 decreased 12.6% to 1.4 million ounces of silver compared to 1.6 million ounces of silver in the first quarter of 2012 due primarily to lower silver ore grades.

Production costs applicable to sales increased by 15.2% during the first quarter of 2013 as compared to the first quarter of 2012 due primarily to increased throughput of lower ore grade at the mine.

Total cash operating costs per ounce during the first quarter of 2013 were $13.27 and total cash costs per ounce, including royalties and taxes, were $14.32 compared to $10.21 and $11.49, respectively, in the first quarter of 2012.

On October 14, 2009, the Bolivian state-owned mining organization, COMIBOL, announced by resolution that it was temporarily suspending mining activities above the elevation of 4,400 meters above sea level while stability studies of the Cerro Rico mountain are undertaken. The Company holds rights to mine above this elevation under valid contracts with COMIBOL as well as under authorized contracts with local mining cooperatives that hold their rights under contract themselves with COMIBOL. The Company temporarily adjusted its mine plan to confine mining activities to the ore deposits below 4,400 meters above sea level and timely notified COMIBOL of the need to lift the restriction.

The Cooperative Reserva Fiscal, with which the Company has one of those contracts, subsequently interpreted the COMIBOL resolution and determined that the Huacajchi deposit was not covered by such resolution. In March 2010, the Cooperative Reserva Fiscal notified COMIBOL that, based on its interpretation, it was resuming mining of high grade material above the 4,400 meter level in the Huacajchi deposit. In December 2011, the Cooperative Reserva Fiscal sent a similar notification to COMIBOL with respect to a further area above the 4,400 meter level known as Huacajchi Sur. Based on these notifications and on the absence of any objection from COMIBOL, the Company resumed mining operations at the San Bartolomé mine on the Huacajchi deposit and Huacajchi Sur. Mining in other areas above the 4,400 meter level continues to be suspended.

The partial suspension may reduce production until the Company is able to resume mining above 4,400 meters generally. It is uncertain at this time how long the suspension will remain in place. In addition, it is possible that COMIBOL may decide that the Company's operations at the Huacajchi deposit or Huacajchi Sur are subject to the COMIBOL resolution, which may force the Company to cease mining at such deposits. If COMIBOL objects to the Company mining at the Huacajchi deposit or Huacajchi Sur or if the other restrictions are not lifted, the Company may need to write down the carrying value of the asset. It is also uncertain if any new mining or investment policies or shifts in political attitude may affect mining in Bolivia.

### Kensington Mine:

Production at Kensington during the first quarter of 2013 was 25,206 ounces of gold, as compared to 7,444 ounces of gold for the same time period of 2012, which was affected by the temporary scale back in production from November of 2011 until April 2012 to allow for the completion of several critical underground and surface infrastructure projects.

Total cash operating costs per ounce in the first quarter of 2013 were $1,055 as compared to $2,709 for the same time period during 2012.

Continuous improvements at the mill resulted in a 96.2% recovery rate in the first quarter of 2013 compared to 93.4% in the first quarter 2012.

### Rochester Mine:

Production was 0.6 million ounces of silver and 8,742 ounces of gold during the first quarter of 2013 compared to 0.4 million ounces of silver and 5,292 ounces of gold in the first quarter of 2012. Production costs applicable to sales increased to $21.5 million during the first quarter of 2013, as compared to $9.6 million during the same time period in 2012 due to the increase in production. Total cash operating costs per silver ounce in the first quarter of 2013 were $13.54 and total cash costs per silver ounce, including production taxes and royalties, were $16.24 in the first quarter of 2013 as compared to total cash operating costs per silver ounce of $23.35 and total cash costs per silver ounce of $24.75 in the first quarter of 2012.

In 2008, the Company commenced studies to investigate the potential to recommence mining and leaching of new material and in 2009 and 2010 completed feasibility studies demonstrating the viability of an expansion of mining and leaching operations at the mine through 2017. The Company prepared an Amended Plan of Operations for resumption of mining within the existing and permitted Rochester pit and construction of an additional heap leach pad, all within the currently permitted mine boundary. The Bureau of Land Management (BLM) deemed this plan complete in August 2009 under federal regulations and initiated the National Environmental Policy Act process. The BLM issued a positive Decision Record (DR) for the mine to extend silver and gold mining operations by several years. The Company began to recover new production ounces in the fourth quarter of 2011.

### Endeavor Mine:

Silver production at the Endeavor mine in the first quarter of 2013 was 0.1 million ounces compared to 0.2 million ounces in the first quarter of 2012. Production costs applicable to sales were $1.3 million for the quarter compared to $2.7 million in the first quarter of 2012. Total cash costs per ounce of silver produced were $17.30 in the first quarter of 2013 compared to $16.64 in the first quarter of 2012.

As of March 31, 2013, CDE Australia Pty Ltd had recovered approximately 102% of the original transaction consideration to acquire the silver stream, consisting of 4.3 million payable ounces, or 21.5% of the 20.0 million maximum payable silver ounces to which CDE Australia Pty. Ltd is entitled under the terms of the silver sale and purchase agreement.

### Minority Investments in Silver and Gold Development Companies

Between January 1, 2011 and March 31, 2013, the Company made strategic minority investments in eight silver and gold development companies in North and South America as part of its business growth strategy. Coeur made such investments in Apogee Silver Ltd; Caracara Silver Peru, Inc.; Huldra Silver, Inc.; Silver Bull Resources, Inc.; Soltoro Ltd.; Pershing Gold Corporation; International Northair Mines Ltd; and Commonwealth Silver and Gold Mining, Inc. As of March 31, 2013, the Company's investments in these companies had an estimated fair value of $23.5 million.

### Operating Statistics from Continuing Operations

The following table presents information by mine and consolidated sales information for the three month periods ended March 31, 2013 and 2012:

| Silver Operations: Palmarejo | Three months ended March 31, 2013 | 2012 |
| --- | ---: | ---: |
| Tons milled | 573,170 | 528,543 |
| Ore grade/Ag oz | 3.65 | 6.12 |
| Ore grade/Au oz | 0.04 | 0.06 |
| Recovery/Ag oz(F) | 78.8% | 76.8% |
| Recovery/Au oz(F) | 90.1% | 93.3% |
| Silver production ounces | 1,646,397 | 2,482,814 |
| Gold production ounces | 22,965 | 31,081 |
| Cash operating cost/oz | $2.20 | $(2.27) |
| Cash cost/oz | $2.20 | $(2.27) |
| Total production cost/oz | $20.14 | $13.04 |
| **San Bartolomé** |  |  |
| Tons milled | 374,985 | 378,104 |
| Ore grade/Ag oz | 4.09 | 4.62 |
| Recovery/Ag oz(F) | 90.6% | 91.2% |
| Silver production ounces | 1,391,099 | 1,591,292 |
| Cash operating cost/oz | $13.27 | $10.21 |
| Cash cost/oz | $14.32 | $11.49 |
| Total production cost/oz | $18.13 | $14.02 |
| **Martha** |  |  |
| Tons milled | — | 34,069 |
| Ore grade/Ag oz | — | 4.43 |
| Ore grade/Au oz | — | 0.01 |
| Recovery/Ag oz(F) | —% | 81.4% |
| Recovery/Au oz(F) | —% | 64.6% |
| Silver production ounces | — | 122,793 |
| Gold production ounces | — | 84 |
| Cash operating cost/oz | $— | $46.48 |
| Cash cost/oz | $— | $47.15 |
| Total production cost/oz | $— | $51.85 |
| Rochester (A) |  |  |
| Tons milled | 2,439,757 | 2,009,518 |
| Ore grade/Ag oz | 0.52 | 0.55 |
| Ore grade/Au oz | 0.003 | 0.004 |
| Recovery/Ag oz(G) | 50.8% | 40.2% |
| Recovery/Au oz(G) | 108.6% | 62.1% |
| Silver production ounces | 647,589 | 441,337 |
| Gold production ounces | 8,742 | 5,292 |
| Cash operating cost/oz | $13.54 | $23.35 |
| Cash cost/oz | $16.24 | $24.75 |
| Total production cost/oz | $19.61 | $28.67 |

32

| Endeavor | Three months ended March 31, 2013 | 2012 |
| --- | ---: | ---: |
| Tons milled | 194,519 | 195,846 |
| Ore grade/Ag oz | 1.61 | 3.35 |
| Recovery/Ag oz(F) | 47.8% | 37.8% |
| Silver production ounces | 149,594 | 247,958 |
| Cash operating cost/oz | $17.30 | $16.64 |
| Cash cost/oz | $17.30 | $16.64 |
| Total production cost/oz | $22.81 | $23.27 |
| **Gold Operation:** |  |  |
| **Kensington** |  |  |
| Tons milled | 129,057 | 43,936 |
| Ore grade/Au oz | 0.20 | 0.18 |
| Recovery/Au oz(F) | 96.2% | 93.4% |
| Gold production ounces | 25,206 | 7,444 |
| Cash operating cost/oz | $1,055 | $2,709 |
| Cash cost/oz | $1,055 | $2,709 |
| Total production cost/oz | $1,586 | $3,598 |
| **CONSOLIDATED PRODUCTION TOTALS (B)** |  |  |
| Total silver ounces | 3,834,679 | 4,886,194 |
| Total gold ounces | 56,913 | 43,901 |
| **Silver Operations:(C)** |  |  |
| Cash operating cost per oz - silver | $8.73 | $6.29 |
| Cash cost per oz - silver | $9.56 | $6.85 |
| Total production cost oz - silver | $19.43 | $16.26 |
| **Gold Operation:(D)** |  |  |
| Cash operating cost per oz - gold | $1,055 | $2,709 |
| Cash cost per oz - gold | $1,055 | $2,709 |
| Total production cost per oz - gold | $1,586 | $3,598 |
| CONSOLIDATED SALES TOTALS (E) |  |  |
| Silver ounces sold | 3,076,535 | 4,290,049 |
| Gold ounces sold | 51,926 | 38,884 |
| Realized price per silver ounce | $30.30 | $32.61 |
| Realized price per gold ounce | $1,630 | $1,702 |

(A) The Rochester mine recommenced production in the fourth quarter of 2011. The leach cycle at Rochester requires five to ten years to recover gold and silver contained in the ore. The Company estimates the ultimate recovery to be approximately 61% for silver and 92% for gold. However, ultimate recoveries will not be known until leaching operations cease, which is currently estimated for 2017. Current recovery may vary significantly from ultimate recovery. See Critical Accounting Policies and Estimates – Ore on Leach Pad in the Company’s Form 10-K for the year ended December 31, 2012.

(B) Current production ounces and recoveries reflect final metal settlements of previously reported production ounces.

(C) Amount includes by-product gold credits deducted in computing cash costs per ounce.

(D) Amounts reflect Kensington per ounce statistics only.

(E) Units sold at realized metal prices will not match reported metal sales due primarily to the effects on revenues of mark-to-market adjustments on embedded derivatives in the Company’s provisionally priced sales contracts.

(F) Recoveries are affected by timing inherent in the leaching process.

(G) Recoveries at Rochester are affected by residual leaching on Stage IV and timing differences inherent in the heap leaching process.

“Cash Operating Costs per Ounce” and “Cash Costs per Ounce” are calculated by dividing the operating cash costs and cash costs computed for each of the Company’s mining properties for a specified period by the amount of gold ounces or silver ounces produced by that property during that same period. Management uses cash operating costs per ounce and cash costs per ounce as key indicators of the profitability of each of its mining properties. Gold and silver are sold and priced in the world financial markets on a U.S. dollar per ounce basis.

“Cash Operating Costs” and “Cash Costs” are costs directly related to the physical activities of producing silver and gold, and include mining, processing and other plant costs, third-party refining and smelting costs, marketing expenses, on-site general and administrative costs, royalties, in-mine drilling expenditures related to production and other direct costs. Produced by-product metal units at the average market price is deducted from the above in computing cash costs. Cash costs exclude depreciation, depletion and amortization, accretion, corporate general and administrative expenses, exploration, interest, and pre-feasibility costs. Cash operating costs include all cash costs except production taxes and royalties, if applicable. Cash costs are calculated and presented using the “Gold Institute Production Cost Standard” applied consistently for all periods presented.

Total cash operating costs and cash costs per ounce are non-U.S. GAAP measures and investors are cautioned not to place undue reliance on them and are urged to read all U.S. GAAP accounting disclosures presented in the consolidated financial statements and accompanying footnotes. In addition, see the reconciliation of “cash costs” to production costs under “Reconciliation of Non-U.S. GAAP Cash Costs to U.S. GAAP Production Costs” set forth below. We supplement the reporting of our financial information determined under United States generally accepted accounting principles (U.S. GAAP) with certain non-U.S. GAAP financial measures, including cash operating costs, cash costs and operating cash flow. We believe that these adjusted measures provide meaningful information to assist management, investors and analysts in understanding our financial results and assessing our prospects for future performance. We believe these adjusted financial measures are important indicators of our recurring operations because they exclude items that may not be indicative of, or are unrelated to our core operating results, and provide a better baseline for analyzing trends in our underlying businesses. We believe cash operating costs, cash costs and operating cash flow are important measures in assessing the Company's overall financial performance.

The following tables present a reconciliation between non-U.S. GAAP cash operating costs per ounce and cash costs per ounce to production costs applicable to sales including depreciation, depletion and amortization, which are calculated in accordance with U.S. GAAP:

*Reconciliation of Non-U.S. GAAP Cash Costs to U.S. GAAP Production Costs Three months ended March 31, 2013*

*(In thousands except ounces and per ounce costs)*

|  | Palmarejo | San Bartolomé | Kensington | Rochester | Martha | Endeavor | Total |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Total cash operating cost (Non-U.S. GAAP) | $3,618 | $18,465 | $26,582 | $8,769 | $33 | $2,588 | $60,055 |
| Royalties | — | 1,452 | — | 1,025 | — | — | 2,477 |
| Production taxes | — | — | — | 725 | — | — | 725 |
| Total cash costs (Non-U.S. GAAP) | $3,618 | $19,917 | $26,582 | $10,519 | $33 | $2,588 | $63,257 |
| Add/Subtract: |  |  |  |  |  |  |  |
| Third party smelting costs | — | — | (3,266) | — | (33) | (920) | (4,219) |
| By-product credit | 37,263 | — | — | 14,288 | — | — | 51,551 |
| Other adjustments | 604 | 554 | — | — | — | — | 1,158 |
| Change in inventory | (14,767) | (4,793) | 248 | (3,305) | — | (347) | (22,964) |
| Depreciation, depletion and amortization | 28,935 | 4,755 | 13,386 | 2,181 | — | 824 | 50,081 |
| Production costs applicable to sales, including depreciation, depletion and amortization (U.S. GAAP) | $55,653 | $20,433 | $36,950 | $23,683 | $— | $2,145 | $138,864 |
| Production of silver (ounces) | 1,646,397 | 1,391,099 | — | 647,589 | — | 149,594 | 3,834,679 |
| Cash operating cost per silver ounce | $2.20 | $13.27 | $— | $13.54 | $— | $17.30 | $8.73 |
| Cash costs per silver ounce | $2.20 | $14.32 | $— | $16.24 | $— | $17.30 | $9.56 |
| Production of gold (ounces) | — | — | 25,206 | — | — | — | 25,206 |
| Cash operating cost per gold ounce | $— | $— | $1,055 | $— | $— | $— | $1,055 |
| Cash cost per gold ounce | $— | $— | $1,055 | $— | $— | $— | $1,055 |

34

*Reconciliation of Non-U.S. GAAP Cash Costs to U.S. GAAP Production Costs Three months ended March 31, 2012*

*(In thousands except ounces and per ounce costs)*

|  | Palmarejo | San Bartolomé | Kensington | Rochester | Martha | Endeavor | Total |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Total cash operating cost (Non-U.S. GAAP) | $(5,643) | $16,253 | $20,168 | $10,303 | $5,708 | $4,127 | $50,916 |
| Royalties | — | 2,036 | — | 609 | 82 | — | 2,727 |
| Production taxes | — | — | — | 12 | — | — | 12 |
| Total cash costs (Non-U.S. GAAP) | $(5,643) | $18,289 | $20,168 | $10,924 | $5,790 | $4,127 | $53,655 |
| Add/Subtract: |  |  |  |  |  |  |  |
| Third party smelting costs | — | — | (1,083) | — | (1,975) | (788) | (3,846) |
| By-product credit | 52,526 | — | — | 8,957 | 141 | — | 61,624 |
| Other adjustments | 244 | (194) | 7 | 87 | 57 | — | 201 |
| Change in inventory | (1,268) | (4,487) | (2,001) | (10,403) | (320) | (601) | (19,080) |
| Depreciation, depletion and amortization | 37,761 | 4,219 | 6,604 | 1,642 | 520 | 1,644 | 52,390 |
| Production costs applicable to sales, including depreciation, depletion and amortization (U.S. GAAP) | $83,620 | $17,827 | $23,695 | $11,207 | $4,213 | $4,382 | $144,944 |
| Production of silver (ounces) | 2,482,814 | 1,591,292 | — | 441,337 | 122,793 | 247,958 | 4,886,194 |
| Cash operating cost per silver ounce | $(2.27) | $10.21 | $— | $23.35 | $46.48 | $16.64 | $6.29 |
| Cash costs per silver ounce | $(2.27) | $11.49 | $— | $24.75 | $47.15 | $16.64 | $6.85 |
| Production of gold (ounces) | — | — | 7,444 | — | — | — | 7,444 |
| Cash operating cost per gold ounce | $— | $— | $2,709 | $— | $— | $— | $2,709 |
| Cash cost per gold ounce | $— | $— | $2,709 | $— | $— | $— | $2,709 |

Gold is accounted for as a by-product credit at the Palmarejo and Rochester mines whereby revenues from gold are deducted from operating costs in the calculation of cash costs per ounce. Significant by-product credits are due in part to gold production and an increase in price over the last three years. For the three months ended March 31, 2013 and 2012, gold by-products credits for Palmarejo were approximately $22.63 and $21.16 per silver ounce, respectively, and gold by-product credits for Rochester were $22.06 and $20.30 per silver ounce, respectively. If the Company's accounting policy was changed to treat gold as a co-product, the following costs per ounce would be reported:

|  | Three months ended March 31, 2013 Palmarejo | Rochester |
| --- | ---: | ---: |
| Total cash operating costs | $40,881 | $23,057 |
| Total cash costs | $40,881 | $24,807 |
| Revenue |  |  |
| Silver | 59% | 55% |
| Gold | 41% | 45% |
| Ounces produced |  |  |
| Silver | 1,646,397 | 647,589 |
| Gold | 22,965 | 8,742 |
| Total cash operating costs per ounce |  |  |
| Silver | $14.64 | $19.49 |
| Gold | $731 | $1,194 |
| Total cash costs per ounce |  |  |
| Silver | $14.64 | $20.97 |
| Gold | $731 | $1,284 |

35

|  | Three months ended March 31, 2012 Palmarejo | Rochester |
| --- | ---: | ---: |
| Total cash operating costs | $46,883 | $19,261 |
| Total cash costs | $46,883 | $19,882 |
| Revenue |  |  |
| Silver | 60% | 71% |
| Gold | 40% | 29% |
| Ounces produced |  |  |
| Silver | 2,482,814 | 441,337 |
| Gold | 31,081 | 5,292 |
| Total cash operating costs per ounce |  |  |
| Silver | $11.35 | $31.07 |
| Gold | $602 | $1,049 |
| Total cash costs per ounce |  |  |
| Silver | $11.35 | $32.07 |
| Gold | $602 | $1,083 |

### Exploration Activity

During the first quarter, the Company invested $6.8 million in expensed exploration for discovery of new mineralization and $1.7 million in capitalized exploration for definition of new mineralization, completing nearly 138,000 feet (42,000 meters) of drilling and trenching.

Coeur's exploration program utilized up to 10 drill rigs and a trenching crew: four drills at Palmarejo, three at Kensington (including one drill devoted to definition drilling), two in Argentina (Joaquin and Lejano projects), one at Rochester and the trenching crew at San Bartolomé.

### Palmarejo

- Drilling for discoveries of new mineralization was conducted around the Palmarejo surface and underground mines to test new targets generated in 2012. The most significant results received in the first quarter were the footwall and at depth extension of the known Tucson-Chapotillo deposit.
- Drilling was performed underground on the 108 zone at Palmarejo and on the surface at the Las Animas zone at the southeastern part of the Guadalupe deposit to upgrade the confidence of and extend the known mineralized zones. Results received from both areas have been largely favorable and are expected to extend and upgrade the current mineralization at the 108 zone and at Las Animas.The third phase of metallurgical sampling continued at La Patria to test the amenability of the current mineralized zones to cyanidation recovery methods. Construction of a model of the metallurgical rock types - oxide, mixed and sulfide - commenced, which is expected to enable the Company to match metallurgical responses to deposit geology.

### Kensington

- Drilling during the first quarter was mostly devoted to production definition drilling in order to develop stoping (mining) blocks from year-end reserves.
- Exploration drilling focused on upgrading and expanding existing mineralized zones to be used in subsequent reserve estimation, mostly at zones 10 and 50 of the main Kensington deposit.
- In addition, drilling was performed at the Comet target, a zone of gold-bearing quartz and sulfide veining situated about 5,000 feet (1,500 meters) southeast of the Raven deposit. Assays are pending.
- New assay results from the Kensington South zone drilled in the fourth quarter of 2012 showed potential for Kensington-style mineralization from this large, relatively untested area. Kensington South is situated south of the main Kensington deposit. To facilitate future drilling, construction of a new cross-cut drift began in the first quarter with completion of 430 feet (131 meters) of the planned 700 feet (213 meters).

### Rochester

- Continuing the exploration focus of 2012, drilling was performed to define grades and tons of existing stockpiles. In the first quarter, over 27,600 feet (8,400 meters) of reverse circulation rotary drilling was completed on two of the stockpiles, called South and Limerick, with favorable results reported.
- Drilling is also planned for the West and Charlie stockpiles during 2013. This work, along with metallurgical sampling, is expected to continue throughout most of this year.

### San Bartolomé

- All of the work in the first quarter was devoted to upgrade the confidence of and extend known mineralization of the Pucka Loma zone in the northwest sector of the San Bartolomé mine area.
- The next stage of work planned is to prepare a new model of the mineralization to be used in reserve estimation. To date, two-thirds of the completed trenches encountered bedrock at the base of the gravel (“pallaco”) mineralized layers. The remainder represents an opportunity to extend the thickness of the mineralized gravels, which remain open at depth.
- Exploration trenching is planned now to shift to new targets around the mine.

### Argentina

- Drilling was devoted to testing new targets at the Joaquin project, north and northwest of the two known deposits, La Negra and La Morocha, and at the Lejano project. Both projects are located in the Santa Cruz province of Argentina. Results are pending. At the end of the quarter all planned drilling had been completed.
- A ground geophysical survey (CSAMT) commenced on the Company's Tornado property, also located in Santa Cruz, which is expected to assist in future drill targeting.
- In the coming months, work is planned to focus on refining the geological models of the La Negra, La Morocha and Lejano deposits to support ongoing metallurgical testing, and focus on detailed mapping and sampling of new targets defined in the central and western portions of the extensive Joaquin property.

### Critical Accounting Policies and Estimates

**Use of Estimates:** The preparation of the Company’s consolidated financial statements in conformity with U.S. GAAP requires management to make estimates and assumptions that affect the amounts reported in their consolidated financial statements and accompanying notes. The areas requiring significant management estimates and assumptions relate to: recoverable ounces from proven and probable reserves that are the basis of future cash flow estimates and units-of-production depreciation and amortization calculations; useful lives utilized for depreciation, depletion and amortization; estimates of future cash flows for long-lived assets; estimates of recoverable gold and silver ounces in ore on leach pad; amount and timing of reclamation and remediation costs; valuation allowance for deferred tax assets; assessment of valuation allowance for value added tax receivables; and other employee benefit liabilities.

Please see Note 3 – SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES contained in the Company’s Form 10-K for the year ended December 31, 2012 for additional critical accounting policies and estimates.

### RESULTS OF OPERATIONS

### Three Months Ended March 31, 2013 Compared to Three Months Ended March 31, 2012

Sales of metal from continuing operations in the first quarter of 2013 decreased by 16.0% to $171.8 million from $204.6 million in the first quarter of 2012. The decrease in sales of metal was due to a decrease in silver ounces sold and a decrease in the realized price per ounce of silver and gold. In the first quarter of 2013, the Company sold 3.1 million ounces of silver and 51,926 ounces of gold compared to 4.3 million ounces of silver and 38,884 ounces of gold for the same period in 2012. Realized silver and gold prices in the first quarter of 2013 decreased 7.1% and 4.2%, respectively, over the first quarter 2012. Realized silver and gold prices were $30.30 and $1,630 per ounce, respectively, in the first quarter of 2013, compared to $32.61 and $1,702 per ounce, respectively, in the comparable quarter of 2012.

Included in sales of metals are the by-product sales derived from the sale of gold by the Company's silver mines. Total gold sales for the three months ended March 31, 2013 and 2012 were $80.0 million and $65.3 million, respectively. Of those totals, by-product metal sales in the same periods were $40.7 million and to $54.8 million, respectively.

In the first quarter of 2013, the Company produced a total of 3.8 million ounces of silver and 56,913 ounces of gold, compared to 4.9 million ounces of silver and 43,901 ounces of gold in the first quarter of 2012. The decrease in silver production is primarily due to decreased production at the Palmarejo and San Bartolomé mines. The decrease at Palmarejo was the result of lower grade ore processed from both open pit and underground operations compared to the same time period in 2012. The reduction at San Bartolomé was due to lower silver ore grades.

While quarterly sales of metal declined 16.0%, production costs applicable to sales of metal decreased from $92.6 million in the first quarter of 2012 to $88.8 million in the first quarter of 2013 as a result of the decrease in ounces sold.

Depreciation, depletion, and amortization decreased by $2.2 million, from $52.6 million to $50.4 million, compared to the first quarter of 2012, as a result of decreased depletion at Palmarejo due to a decrease in volume. This was offset by increased depreciation at Palmarejo, Kensington, and Rochester from new projects that have been completed and placed in service this year.

#### Costs and Expenses

Administrative and general expenses increased by $2.6 million or 34.6% during the three months ended March 31, 2013 compared to the same time period in 2012. The increase was primarily due to increased legal and finance related expenses and consulting and recruiting expenses related to the relocation of employees.

Exploration expenses increased to $6.8 million in the first quarter of 2013 compared to $6.6 million in the same period of 2012 primarily due to increased exploration activity at the Palmarejo, Kensington and Rochester mines, and at the Joaquin and Lejano projects.

#### Other Income and Expenses

Non-cash fair value adjustments, net in the three months ended March 31, 2013 were a gain of $17.8 million compared to a loss of $23.1 million in the first quarter of 2012. These fair value adjustments are driven primarily by changing forward gold prices which impact the estimated future liabilities related to the Palmarejo gold production royalty obligation.

Interest income and other decreased by $1.2 million to $3.8 million in the first quarter of 2013 compared with $5.0 million in the first quarter of 2012. The decrease was primarily due to reductions in foreign currency gains on revaluation of foreign denominated accounts offset slightly by gains recognized on the sale of various assets in 2013.

Interest expense, net of capitalized interest, increased to $9.7 million in the first quarter of 2013 from $6.7 million in the first quarter of 2012. The increase is primarily due to an increase in total debt outstanding as a result of issuing the 7.875% Senior Notes.

#### Income Taxes

For the three months ended March 31, 2013, the Company reported an income tax provision of approximately $10.5 million compared to an income tax provision of $15.4 million for the same time period in 2012. The following table summarizes the components of the Company’s income tax provision from continuing operations for the three months ended March 31, 2013 and 2012 (in thousands):

|  | Three months ended March 31, 2013 | 2012 |
| --- | ---: | ---: |
| United States | $(2,487) | $(3,137) |
| Argentina | 73 | (201) |
| Australia | (105) | (711) |
| Mexico | (3,673) | (3,698) |
| Bolivia | (4,328) | (7,689) |
| Income tax provision | $(10,520) | $(15,436) |

During the three months ended March 31, 2013, the Company recognized a current provision primarily related to higher metal prices and inflation adjustments on non-monetary assets. Also as a result of an audit of the 2009 Bolivian tax return, the Company has recognized an additional $1.5 million of tax expense, including interest and penalties, related to uncertainty in similar tax positions. In addition, the Company recognized a net $7.6 million deferred tax provision for the recognition of deferred taxes on deductible temporary differences, foreign exchange rate adjustments and net operating loss carryforwards in various jurisdictions (principally in Bolivia and Mexico).

During the three months ended March 31, 2012, the Company recognized a current provision in Bolivia, Mexico and Australia primarily related to higher metal prices and inflationary adjustments on non-monetary assets. In addition, the Company recognized a net $7.7 million deferred tax provision for the recognition of deferred taxes on deductible temporary differences, foreign exchange rate adjustments and net operating loss carryforwards in various jurisdictions (principally in Bolivia and Mexico).

#### LIQUIDITY AND CAPITAL RESOURCES

### Liquidity

#### Working Capital; Cash and Cash Equivalents

As of March 31, 2013, the Company’s cash, cash equivalents and short-term investments totaled $332.8 million compared to $126.4 million as of December 31, 2012.

The Company’s working capital increased by $314.1 million between December 31, 2012 and March 31, 2013 to $482.0 million, compared to $167.9 million at December 31, 2012. The ratio of current assets to current liabilities was 4.10 to 1 at March 31, 2013 and was 1.70 to 1 at December 31, 2012. The increase was primarily attributable to the proceeds from the offering of the 7.875% Senior Notes due 2021, which are classified as long-term liabilities.

The Company intends to reinvest indefinitely a portion of its earnings from its Palmarejo operations in Mexico. Accordingly, U.S. and non-U.S. income and withholding taxes for which deferred taxes might otherwise be required, have not been provided on a cumulative amount of temporary differences (including, for this purpose, any difference between the tax basis in the stock of a consolidated subsidiary and the amount of the subsidiary’s net equity determined for financial reporting purposes) related to investments in foreign subsidiaries of approximately $170.0 million for the three months ended March 31, 2013 and the year ended December 31, 2012. The additional U.S. and non-U.S. income and withholding tax that would arise on the reversal of the temporary differences could be offset in part, by tax credits. Because the determination of the amount of available tax credits and the limitations imposed on the annual utilization of such credits are subject to a highly complex series of calculations and expense allocations, it is impractical to estimate the amount of net income and withholding tax that might be payable if a reversal of temporary differences occurred. The Company does not believe that the amounts permanently reinvested will have a material impact on liquidity.

### Cash Provided by Operating Activities

Excluding changes in operating assets and liabilities, the Company’s operating cash flow consisted of the following:

*(In thousands)*

|  | Three months ended March 31, 2013 | 2012 |
| --- | ---: | ---: |
| CASH PROVIDED BY OPERATING ACTIVITIES | $12,934 | $17,002 |
| Changes in operating assets and liabilities: |  |  |
| Receivables and other current assets | (3,968) | 2,956 |
| Prepaid expenses and other | 2,240 | (4,774) |
| Inventories | 20,493 | 24,722 |
| Accounts payable and accrued liabilities | 27,025 | 53,929 |
| Operating cash flow (Non GAAP) | $58,724 | $93,835 |

### Cash Used in Investing Activities

Net cash used in investing activities in the three months ended March 31, 2013 was $23.3 million, compared to $12.5 million in the three months ended March 31, 2012. The increase was primarily the result of decreased proceeds from maturities of short term investments.

The Company spent $12.8 million on capital expenditures in the first quarter of 2013, compared with $31.6 million during the same time period last year. Capital expenditures in the first quarter were primarily related to capitalized drilling and development of the Guadalupe satellite underground mine; underground development at Palmarejo, underground development at Kensington, and the stage 3 leach pad, metal removal system, and crusher at Rochester.

The Company also provided $11.6 million to Orko as an advance toward settling the break fee obligation Orko had under a prior agreement to be acquired by a third party.

### Cash Used in Financing Activities

Net cash provided by financing activities during the three months ended March 31, 2013 was $216.2 million compared to net cash used of $27.7 million for the same time period last year. The increase in cash provided by financing activities is primarily the result of the proceeds from the offering of the 7.875% Senior Notes. During the three months ended March 31, 2013, the Company paid $70.8 million to reduce existing debt and royalty obligations, primarily repurchasing $43.3 million in aggregate principal amount of the 3.25% Convertible Senior Notes due 2028 and paying down the minimum obligation under the Palmarejo gold production royalty.

### Debt and Capital Resources

### 7.875% Senior Notes due 2021

On January 29, 2013, the Company completed an offering of $300 million in aggregate principal amount of 7.875% Senior Notes due 2021 (the “Notes”) in a private placement conducted pursuant to Rule 144A and Regulation S under the Securities Act of 1933, as amended (the “Securities Act”). As of March 31, 2013, the outstanding balance of the Notes was $300.0 million.

The Notes are governed by an Indenture, dated as of January 29, 2013 (the “Indenture”), among the Company, as issuer, certain of the Company's subsidiaries named therein, as guarantors thereto (the “Guarantors”), and The Bank of New York Mellon, as trustee (the “Trustee”).

The Notes bear interest at a rate of 7.875% per year from the date of original issuance or from the most recent payment date to which interest has been paid or provided for. Interest on the Notes is payable semi-annually in arrears on February 1 and August 1 of each year, commencing on August 1, 2013. The Company will make each interest payment to the holders of record of the Notes on the immediately preceding January 15 and July 15. In certain circumstances the Company may be required to pay additional interest. For the three months ended March 31, 2013 interest expense recognized was $4.1 million.

At any time prior to February 1, 2017, the Company may redeem all or part of the Notes upon not less than 30 nor more than 60 days prior notice at a redemption price equal to the sum of (i) 100% of the principal amount thereof, plus (ii) a make-whole premium as of the date of redemption, plus (iii) accrued and unpaid interest and additional interest, if any, thereon, to the date of redemption. In addition, the Company may redeem some or all of the Notes on or after February 1, 2017, at redemption prices set forth in the Indenture, together with accrued and unpaid interest. At any time prior to February 1, 2016, the Company may use the proceeds of certain equity offerings to redeem up to 35% of the aggregate principal amount of the Notes, including any permitted additional Notes, at a redemption price equal to 107.875% of the principal amount.

The terms of the notes include affirmative and negative covenants that the Company believes are usual and customary, including covenants that restrict the ability of the Company and its subsidiaries to incur additional debt, incur or permit liens on assets, make investments and acquisitions, consolidate or merge with any other company, engage in asset sales, pay dividends and distributions or repurchase or redeem capital stock, restrict the ability of subsidiaries to pay dividends to the Company, prepay, redeem or repurchase certain debt, or enter into transactions with affiliates.

The Indenture also contains certain “Events of Default” (as defined in the Indenture) customary for indentures of this type. If an Event of Default has occurred and is continuing, the Trustee or the holders of not less than 25% in aggregate principal amount of the Notes then outstanding may, and the Trustee at the request of the holders of not less than 25% in aggregate principal amount of the Notes then outstanding shall, declare all unpaid principal of, premium, if any, and accrued interest on all the Notes to be due and payable.

### Revolving Credit Facility

On August 1, 2012, Coeur Alaska, Inc. and Coeur Rochester, Inc. (the “Borrowers”), each a wholly-owned subsidiary of the Company, entered into a Credit Agreement (the “Credit Agreement”) by and among the Company, the Borrowers, the lenders party thereto and Wells Fargo Bank, N.A., as administrative agent. The Credit Agreement provides for a senior secured revolving credit facility (the “Revolving Credit Facility”) in an aggregate principal amount of up to $100.0 million, which principal amount may be increased, subject to receiving additional commitments therefor, by up to $50.0 million. There is a quarterly commitment fee of 0.1% on the unused portion of the line. The unused line fee for the three months ended March 31, 2013 was $0.1 million and was charged to interest expense.

The term of the Revolving Credit Facility is four years. Amounts may be borrowed under the Revolving Credit Facility to finance working capital and general corporate purposes of the Company and its subsidiaries, including the payment of fees and expenses incurred in connection with the Revolving Credit Facility. The obligations under the Revolving Credit Facility would be secured by substantially all of the assets of the Company and its domestic subsidiaries, including the land, mineral rights and infrastructure at the Kensington and Rochester mines, as well as a pledge of the shares of certain of the Company's subsidiaries. In addition, in connection with the Revolving Credit Facility, Coeur Alaska, Inc. transferred its existing hedge positions established under the Kensington Term Facility, to Wells Fargo Bank, N.A. as hedge provider.

Borrowings under the Revolving Credit Facility would bear interest at a rate selected by the Borrowers equal to either LIBOR plus a margin of 2.25%-3.25% or an alternate base rate plus a margin of 1.25%-2.25%, with the margin determined by reference to the Company's ratio of consolidated debt to adjusted EBITDA.

Voluntary prepayments of the loans and voluntary reductions of the unutilized portion of the commitments under the Revolving Credit Facility are permitted without prepayment premium or penalty, subject to payment of customary LIBOR breakage costs. Amounts so repaid may be re-borrowed subject to customary requirements.

The Revolving Credit Facility contains representations and warranties, events of default and affirmative and negative covenants that the Company believes are usual and customary, including covenants that, among other things, restrict the ability of the Company and its subsidiaries to incur additional debt, incur or permit liens on assets, make investments and acquisitions, consolidate or merge with any other company, engage in asset sales and make dividends and distributions. The Revolving Credit Facility also contains financial covenants that require (i) ratio of consolidated debt to adjusted EBITDA to be not greater than 3.25 to 1.00 (subject to a step-down to 3.00 to 1.00 after two years), (ii) ratio of adjusted EBITDA to interest expense to be not less than 3.00 to 1.00 and (iii) tangible net worth to be not less than 90% of tangible net worth as of March 31, 2012 plus 25% of net income for each fiscal quarter ending after March 31, 2012 to the date of measurement.

As of March 31, 2013, no amounts have been drawn.

### 3.25% Convertible Senior Notes due 2028

Per the indenture governing the 3.25% Convertible Senior Notes due 2028 (the “Convertible Notes”), the Company announced on February 13, 2013 that it was offering to repurchase all of its outstanding Convertible Notes. As of February 12, 2013, there was $48.7 million aggregate principal amount of Convertible Notes outstanding. The Company repurchased $43.3 million in aggregate principal amount, leaving a balance of $5.3 million at March 31, 2013.

The fair value of the notes outstanding, as determined by market transactions at March 31, 2013 and December 31, 2012 was $5.4 million and $48.2 million, respectively. The carrying value of the equity component at March 31, 2013 and December 31, 2012 was $10.9 million.

For the three months ended March 31, 2013 and 2012, interest expense recognized was $0.3 million and $0.4 million, respectively. For the three months ended March 31, 2013 and 2012 accretion of the debt discount was $0.6 million and $0.6, respectively. The effective interest rate on the notes was 8.9%.

Each holder of the Convertible Notes may require that the Company repurchase some or all of the holder’s notes on March 15, 2015, March 15, 2018 and March 15, 2023 at a repurchase price equal to 100% of the principal amount of the notes to be repurchased, plus accrued and unpaid interest, in cash, shares of common stock or a combination of cash and shares of common stock, at the Company’s election. Holders would also have the right, following certain fundamental change transactions, to require the Company to repurchase all or any part of their notes for cash at a repurchase price equal to 100% of the principal amount of the notes to be repurchased plus accrued and unpaid interest. The Company may redeem the notes for cash in whole or in part at any time on or after March 22, 2015 at 100% of the principal amount of the notes to be redeemed plus accrued and unpaid interest.

The Convertible Notes provide for “net share settlement” of any conversions. Pursuant to this feature, upon conversion of the notes, the Company (1) would pay the note holder an amount in cash equal to the lesser of the conversion obligation or the principal amount of the notes and (2) would settle any excess of the conversion obligation above the notes’ principal amount in the Company’s common stock, cash or a combination thereof, at the Company’s election.

The Convertible Notes are convertible under certain circumstances, as defined in the indenture, at the holder’s option, at an initial conversion rate of 17.60254 shares of the Company’s common stock per $1,000 principal amount of notes, which is equivalent to an initial conversion price of approximately $56.81 per share, subject to adjustment in certain circumstances.

### Kensington Term Facility

On August 16, 2012, Coeur Alaska prepaid all obligations and indebtedness outstanding under the Term Facility Agreement dated October 27, 2009 by and among Coeur Alaska, Inc. and the Financial Institutions listed on schedule 1 thereto (the "Kensington Term Facility"), which totaled approximately $68.6 million. Upon payment in full, the Kensington Term Facility was terminated and all of the liens granted under the Kensington Term Facility were released.

As a condition to the Kensington Term Facility, the Company agreed to enter into a gold hedging program which protects a minimum of 243,750 ounces of gold production over the life of the facility against the risk associated with fluctuations in the market price of gold. This program consists of a series of zero cost collars which consist of a floor price and a ceiling price of gold. Coeur Alaska has transferred these hedge positions to Wells Fargo Bank, N.A., as hedge provider. Call options protecting 92,000 ounces of gold were outstanding at March 31, 2013. The weighted average strike price of the call options was $1,966.14. Put options protecting 109,500 ounces of gold were outstanding at March 31, 2013. The weighted average strike price of the put options was $973.14. Call options protecting 97,000 ounces of gold were outstanding at December 31, 2012. The weighted average strike price of the call options was $1,967.89. Put options protecting 122,000 ounces of gold were outstanding at December 31, 2012. The weighted average strike price of the put options was $967.86.

### Capital Lease Obligations

As of March 31, 2013 and December 31, 2012, the Company had outstanding balances on capital leases of $8.6 million and $11.4 million, respectively.

### Palmarejo Gold Production Royalty Obligation

The Company recognized accretion expense on the Palmarejo gold production royalty obligation of $4.1 million and $5.1 million for the three months ended March 31, 2013 and 2012, respectively. As of March 31, 2013 and December 31, 2012, the remaining minimum obligation under the royalty agreement was $59.7 million and $61.9 million, respectively.

### Capitalized Interest

The Company capitalizes interest incurred on its various debt instruments as a cost of properties under development. For the three months ended March 31, 2013 and 2012, the Company capitalized interest of $0.4 million and $1.1 million, respectively.

### Litigation and Other Events

For a discussion of litigation and other events, see Note 19 to the Company’s Condensed Consolidated Financial Statements, Litigation and Other Events.

## Market risk

As filed, 8,959 characters.

### Risk Mitigation Overview

The Company is exposed to various market risks as a part of its operations. In an effort to mitigate losses associated with these risks, the Company may, at times, enter into derivative financial instruments. These may take the form of forward sales contracts, foreign currency exchange contracts and interest rate swaps. The Company does not actively engage in the practice of trading derivative instruments for profit. This discussion of the Company’s market risk assessments contains “forward looking statements” that are subject to risks and uncertainties. Actual results and actions could differ materially from those discussed below.

The Company’s operating results are substantially dependent upon the world market prices of silver and gold. The Company has no control over silver and gold prices, which can fluctuate widely and are affected by numerous factors, such as supply and demand and investor sentiment. From time to time, in order to mitigate some of the risk associated with these fluctuations, the Company may enter into forward sale contracts. The Company continually evaluates the potential benefits of engaging in these strategies based on current market conditions. The Company may be exposed to nonperformance risk by counterparties as a result of its hedging activities. This exposure would be limited to the amount that the spot price of the metal falls short of the contract price. The Company enters into contracts and other arrangements from time to time in an effort to reduce the negative effect of price changes on its cashflows. These arrangements typically consist of managing the Company’s exposure to foreign currency exchange rates and market prices associated with changes in gold and silver commodity prices. The Company also may manage price risk by purchasing put options.

### Concentrate Sales Contracts

The Company enters into concentrate sales contracts with third-party smelters. The contracts, in general, provide for a provisional payment based upon provisional assays and quoted metal prices. The provisionally priced sales contain an embedded derivative that is required to be separated from the host contract for accounting purposes. The host contract is the receivable from the sale of concentrates at the forward price at the time of sale. The embedded derivative, which is the final settlement price based on a future price, does not qualify for hedge accounting. These embedded derivatives are recorded as derivative assets (in Prepaid expenses and other) or derivative liabilities (in Accrued liabilities and other) on the balance sheet and are adjusted to fair value through earnings each period until the date of final settlement. At March 31, 2013, the Company had outstanding provisionally priced sales of $30.1 million, consisting of 0.1 million ounces of silver and 15,685 ounces of gold, which had a fair value of $29.6 million including the embedded derivative. For each one cent per ounce change in realized silver price, revenue would vary (plus or minus) approximately $1,000; and for each one dollar per ounce change in realized gold price, revenue would vary (plus or minus) approximately $15,700. At December 31, 2012, the Company had outstanding provisionally priced sales of $33.2 million consisting of 0.4 million ounces of silver and 11,957 ounces of gold, which had a fair value of approximately $34.1 million including the embedded derivative. For each one cent per ounce change in realized silver price, revenue would vary (plus or minus) approximately $4,000 and for each one dollar per ounce change in realized gold price, revenue would vary (plus or minus) approximately $12,000.

### Foreign Currency Contracts

The Company operates, or has mining interests, in several foreign countries, specifically Argentina, Australia, Bolivia and Mexico, which exposes the Company to risks associated with fluctuations in the exchange rates of the currencies involved. From time to time, as part of its program to manage foreign currency risk, the Company may enter into foreign currency forward exchange contracts. These contracts enable the Company to purchase a fixed amount of foreign currencies at pre-established exchange rates. Gains and losses on foreign exchange contracts that are related to firm commitments are designated and effective as hedges and are deferred and recognized in the same period as the related transaction. The Company has no outstanding firm commitments at March 31, 2013. All other contracts that do not qualify as hedges are marked to market and the resulting gains or losses are recorded in income. The Company continually evaluates the potential benefits of entering into these contracts to mitigate foreign currency risk and proceeds when it believes that the exchange rates are most beneficial.

The Company periodically enters into forward foreign currency contracts to reduce the foreign exchange risk associated with forecasted Mexican peso (“MXN”) operating costs at its Palmarejo mine. At March 31, 2013, the Company had MXN foreign exchange contracts of $29.4 million in U.S. dollars. These contracts require the Company to exchange U.S. dollars for MXN at a weighted average exchange rate of 12.91 MXN to each U.S. dollar and had a fair value of $0.8 million at March 31, 2013. The Company recorded a mark-to-market gain of $0.7 million and $2.7 million for the three months ended March 31, 2013 and 2012, respectively. The mark-to-market gains are reflected in fair value adjustments, net. A 10% weakening of the MXN would result in an increase in fair value of $3.4 million. The Company recorded a realized gain of $0.6 million and a realized loss of $0.8 million in production costs applicable to sales during the three months ended March 31, 2013 and 2012, respectively.

In connection with the arrangement agreement entered into with Orko Silver Corp., the Company entered into a forward foreign currency contract in the first quarter of 2013 to reduce the foreign exchange risk associated with forecasted Canadian dollars ("CAD"). Please see Note 20 - SUBSEQUENT EVENTS for additional information. At March 31, 2013, the Company had a CAD foreign exchange contract of $100 million in U.S. dollars. This contract requires the Company to exchange U.S. dollars for CAD at an exchange rate of 1.0 CAD to each U.S. dollar and the contract had a fair value of $98.4 million at March 31, 2013. The Company recorded a mark-to-market loss on this contract of $1.6 million for the three months ended March 31, 2013. This mark-to-market adjustment is reflected in fair value adjustments, net.

### Palmarejo Gold Production Royalty

On January 21, 2009, the Company entered into the gold production royalty transaction with Franco-Nevada Corporation. The minimum royalty obligation ends when payments have been made on a total of 400,000 ounces of gold. As of March 31, 2013, a total of 184,851 ounces of gold remain outstanding under the minimum royalty obligation. The price volatility associated with the minimum royalty obligation is considered an embedded derivative financial instrument under U.S. GAAP. The fair value of the embedded derivative at March 31, 2013 and December 31, 2012 was a liability of $121.6 million and $145.1 million, respectively. During the three months ended March 31, 2013 and 2012, the mark-to-market adjustments for this embedded derivative amounted to a gain of $23.5 million and a loss of $12.4 million, respectively. For the three months ended March 31, 2013 and 2012, realized losses on settlement of the liabilities were $9.1 million and $13.2 million, respectively. The mark-to-market adjustments and realized losses are included in fair value adjustments, net in the consolidated statement of operations.

For each $1.00 increase in the price of gold, the fair value of the net derivative liability at March 31, 2013 would have increased by approximately $0.2 million. For each $1.00 decrease in the price of gold, the fair value of the net derivative liability at March 31, 2013 would have decreased by approximately $0.2 million.

### Gold Hedges

On March 31, 2013 the Company had outstanding call options requiring it to deliver 92,000 ounces of gold at a weighted average strike price of $1,966.14 per ounce if the market price of gold exceeds the strike price. At March 31, 2013, the Company had outstanding put options allowing it to sell 109,500 ounces of gold at a weighted average strike price of $973.14 per ounce if the market price of gold were to fall below the strike price. The contracts expire by their terms over the next four years. As of March 31, 2013 the fair market value of these contracts was a net liability of $4.5 million.

Additional information about the Company’s derivative financial instruments may be found in Note 15 to the Company’s Condensed Consolidated Financial Statements, Derivative Financial Instruments and Fair Value of Financial Instruments.

## Controls and procedures

As filed, 1,972 characters.

### (a) Disclosure Controls and Procedures

As of the end of the period covered by this quarterly report, the Company carried out an evaluation, under the supervision and with the participation of the Company’s management, including its Chief Executive Officer and Chief Financial Officer, of the effectiveness of the design and operation of the Company’s disclosure controls and procedures (as such term is defined in Rules 13a-15(e) and 15d-15(e) of the Securities Exchange Act of 1934 (the Exchange Act), and management necessarily applied its judgment in assessing the costs and benefits of such controls and procedures, which by their nature, can provide only reasonable assurance regarding management’s control objectives. The design of any system of controls is based in part upon certain assumptions about the likelihood of future events. Based upon the foregoing, the Company’s Chief Executive Officer and Chief Financial Officer concluded that the Company’s disclosure controls and procedures were effective and operating to provide reasonable assurance that information required to be disclosed by it in the reports it files or submits under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in the SEC’s rules and forms, and to provide reasonable assurance that such information is accumulated and communicated to the Company’s management, including its Chief Executive Officer and Chief Financial Officer, as appropriate to allow timely decisions regarding required disclosure.

### (b) Changes in Internal Control over Financial Reporting

Based on an evaluation by the Company’s Chief Executive Officer and Chief Financial Officer, such officers concluded that there was no change in the Company’s internal control over financial reporting during the quarter ended March 31, 2013 that has materially affected, or is reasonably likely to materially affect, the Company’s internal control over financial reporting.

## Risk factors

As filed, 3,533 characters.

Item 1A (Risk Factors) of the Company's Annual Report on Form 10-K for the year ended December 31, 2012 sets forth information relating to important risks and uncertainties that could materially adversely affect the Company's business, financial condition or operating results. Those risk factors continue to be relevant to an understanding of the Company's business, financial condition and operating results. In addition, those risk factors have been supplemented and updated in this Form 10-Q. Additional risks and uncertainties that we do not presently know or that we currently deem immaterial also may impair our business operations.

***The Company's acquisition of Orko Silver Corp. and the La Preciosa primary silver project introduces significant risks as to development, operation and regulation.***

As a development phase project, La Preciosa is subject to numerous risks. These risks include uncertainty as to the ultimate extent, quality, grade and mineability of silver mineralization. Further, the Company may be unable to complete project and environmental permitting within an economically acceptable time frame. We cannot assure that the development of the La Preciosa project will continue in accordance with current expectations or at all.

The preliminary economic assessment (“PEA”) for the La Preciosa project does not have sufficient certainty to constitute a pre-feasibility study or a feasibility study. The PEA includes mineralized material that is considered too speculative geologically to have economic considerations applied to it that would enable it to be categorized as proven and probable reserves. We cannot assure that the PEA will be realized or that the Company will ever be in a position to identify proven and probable reserves at the La Preciosa project. In particular, the PEA uses estimated capital costs and operating costs which are based on factors including tonnage and grades of metal expected to be mined and processed and expected recovery rates, none of which has been completed to a pre-feasibility study or a feasibility study level. Whether the Company completes a feasibility study on the La Preciosa project, and thereby identifies proven and probable reserves, depends on a number of factors, including the attributes of the deposit (including size, grade, geological formation and proximity to infrastructure), metal prices, government regulations (including with respect to taxes, royalties, land use, international trade and permitting) and environmental protections. It is possible that proven and probable reserves will never be identified at the La Preciosa project, which would inhibit the Company's ability to develop the La Preciosa project into a commercial mining operation.

The Company plans to re-engineer the La Preciosa project as a large-tonnage, open pit operation in an effort to maximize annual production and mine life. However, the Company may be unable to obtain the permits required for this re-engineering, or the Company may be unable to complete the re-engineering in a manner that complies with environmental laws. Further, geological or technological impediments to extraction and processing may render the re-engineering impracticable or uneconomic.

As a result of these and related risks, actual cash operating costs and economic returns of the La Preciosa project may materially differ from the costs and returns estimated, and accordingly, the Company's financial condition, results of operations and cash flows may be negatively affected.

Filed May 9, 2013.
Source: SEC EDGAR, the filing index for accession 0000215466-13-000076. Last ingested by Listed: Nov 14, 2026, 12:15 ET. No prices; not investment advice.
