# Coeur Mining, Inc.: Form 10-Q for the period ended Jun 30, 2017

- Company: [Coeur Mining, Inc.](/companies/cde.md) (CIK 215466)
- Form: 10-Q
- Filed: 2017-07-27
- Accepted by EDGAR: Jul 26, 2017, 17:49 ET
- Period: 2017-06-30
- Accession: 0000215466-17-000099
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/215466/000021546617000099/cde-06301710q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/215466/000021546617000099/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2017-06-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 6 months, 2017-01-01 to 2017-06-30 | $379.5m | us-gaap:Revenues |
| Cost of revenue | 3 months, 2017-04-01 to 2017-06-30 | $125.6m | us-gaap:CostOfGoodsSold |
| Cost of revenue | 6 months, 2017-01-01 to 2017-06-30 | $258.3m | us-gaap:CostOfGoodsSold |
| Interest expense | 3 months, 2017-04-01 to 2017-06-30 | $3.7m | us-gaap:InterestExpense |
| Interest expense | 6 months, 2017-01-01 to 2017-06-30 | $7.3m | us-gaap:InterestExpense |
| Income tax | 3 months, 2017-04-01 to 2017-06-30 | −$2.1m | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 6 months, 2017-01-01 to 2017-06-30 | $8.9m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2017-04-01 to 2017-06-30 | −$11.0m | us-gaap:NetIncomeLoss |
| Net income | 6 months, 2017-01-01 to 2017-06-30 | $7.7m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2017-04-01 to 2017-06-30 | −$0.06 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 6 months, 2017-01-01 to 2017-06-30 | $0.04 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2017-04-01 to 2017-06-30 | −$0.06 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 6 months, 2017-01-01 to 2017-06-30 | $0.04 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2017-04-01 to 2017-06-30 | 179,241,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 6 months, 2017-01-01 to 2017-06-30 | 183,120,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months, 2017-04-01 to 2017-06-30 | $29.3m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Operating cash flow | 6 months, 2017-01-01 to 2017-06-30 | $84.5m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 3 months, 2017-04-01 to 2017-06-30 | $37.5m | us-gaap:PaymentsToAcquireProductiveAssets |
| Capital expenditure | 6 months, 2017-01-01 to 2017-06-30 | $61.5m | us-gaap:PaymentsToAcquireProductiveAssets |
| Cash and equivalents | at 2017-06-30 | $250.0m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2017-06-30 | $481.9m | us-gaap:AssetsCurrent |
| Total assets | at 2017-06-30 | $1.39bn | us-gaap:Assets |
| Current liabilities | at 2017-06-30 | $116.7m | us-gaap:LiabilitiesCurrent |
| Current portion of debt | at 2017-06-30 | $13.0m | us-gaap:DebtCurrent |
| Shareholders' equity | at 2017-06-30 | $777.5m | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 67,585 characters.

The following Management’s Discussion and Analysis (“MD&A”) provides information that management believes is relevant to an assessment and understanding of the consolidated financial condition and results of operations of Coeur Mining, Inc. and its subsidiaries (collectively the “Company”, “our”, or “we”). We use certain non-GAAP financial performance measures in our MD&A. For a detailed description of these measures, please see “Non-GAAP Financial Performance Measures” at the end of this item.

We provide certain operational and financial data on a silver equivalent basis, converting gold to silver at a historical 60:1 ratio of silver ounces to gold ounces, unless otherwise noted. We also provide realized silver equivalent data determined by average spot silver and gold prices during the relevant period.

### Overview

We are a gold and silver producer with mines located in the United States, Mexico, and Bolivia and exploration projects in the United States and Mexico. The Palmarejo complex, and Rochester, Kensington, Wharf, and San Bartolomé mines constitute our principal sources of revenue.

The Company's strategy is to discover, acquire, develop and operate low-cost silver and gold mines that produce long-term cash flow, provide opportunities for growth through continued exploration, and generate superior and sustainable returns for stockholders. Management focuses on maximizing net cash flow through identifying and implementing revenue enhancement opportunities, reducing operating and non-operating costs, exercising consistent capital discipline, and efficient working capital management.

### Second Quarter Highlights

- Production of 8.9 million silver equivalent ounces, consisting of 4.0 million silver ounces and 82,819 gold ounces
- Sales of 9.3 million silver equivalent ounces, consisting of 4.1 million silver ounces and 86,194 gold ounces
- Net loss of $11.0 million ($0.06 per share) and adjusted net loss of $2.5 million ($0.01 per share) (see “Non-GAAP Financial Performance Measures”)
- Costs applicable to sales were $13.15 per silver equivalent ounce ($12.23 per average spot silver equivalent ounce) and $866 per gold equivalent ounce (see “Non-GAAP Financial Performance Measures”)
- All-in sustaining costs were $17.83 per silver equivalent ounce ($15.90 per average spot silver equivalent ounce) (see “Non-GAAP Financial Performance Measures”)
- Operating cash flow of $29.3 million and adjusted EBITDA of $33.4 million (see “Non-GAAP Financial Performance Measures”)
- Issued $250.0 million of 5.875% Senior Notes due 2024 (the “2024 Senior Notes”)
- Repurchased $178.0 million of our 7.875% Senior Notes due 2021 (the “2021 Senior Notes”)
- Cash and cash equivalents of $250.0 million at June 30, 2017
- Announced the sale of the Endeavor Silver Stream and our remaining portfolio of royalties for total consideration of $13.0 million. The transaction is expected to close in the third quarter of 2017, subject to customary closing conditions

### Selected Financial and Operating Results

|  | Three months ended June 30, 2017 | 2016 | Six months ended June 30, 2017 | 2016 |
| --- | ---: | ---: | ---: | ---: |
| Metal sales | $173,354 | $180,197 | $379,492 | $326,833 |
| Net income (loss) | $(10,955) | $14,497 | $7,708 | $(5,899) |
| Net income (loss) per share, diluted | $(0.06) | $0.09 | $0.04 | $(0.04) |
| Adjusted net income (loss)(1) | $(2,517) | $16,948 | $4,469 | $6,490 |
| Adjusted net income (loss) per share, diluted(1) | $(0.01) | $0.11 | $0.02 | $0.04 |
| EBITDA(1) | $23,642 | $62,109 | $97,041 | $82,904 |
| Adjusted EBITDA(1) | $33,354 | $72,041 | $89,899 | $108,413 |
| Silver ounces produced | 3,974,982 | 4,029,976 | 7,907,358 | 7,402,450 |
| Gold ounces produced | 82,819 | 92,727 | 171,037 | 170,799 |
| Silver equivalent ounces produced | 8,944,122 | 9,593,596 | 18,169,578 | 17,650,390 |
| Silver ounces sold | 4,086,828 | 3,973,475 | 8,560,540 | 7,502,977 |
| Gold ounces sold | 86,194 | 88,543 | 197,068 | 167,634 |
| Silver equivalent ounces sold | 9,258,455 | 9,286,033 | 20,384,641 | 17,561,045 |
| Average realized price per silver ounce | $16.98 | $17.38 | $17.31 | $16.34 |
| Average realized price per gold ounce | $1,206 | $1,255 | $1,174 | $1,218 |
| Costs applicable to sales per silver equivalent ounce(1) | $13.15 | $10.82 | $12.18 | $11.53 |
| Costs applicable to sales per average spot silver equivalent ounce(1) | $12.23 | $10.00 | $11.33 | $10.58 |
| Costs applicable to sales per gold equivalent ounce(1) | $866 | $649 | $825 | $688 |
| All-in sustaining costs per silver equivalent ounce(1) | $17.83 | $14.92 | $16.29 | $15.56 |
| All-in sustaining costs per average spot silver equivalent ounce(1) | $15.90 | $13.04 | $14.67 | $13.37 |

(1) See “Non-GAAP Financial Performance Measures.”

### Consolidated Financial Results

### Three Months Ended June 30, 2017 compared to Three Months Ended June 30, 2016

### Net Income (Loss)

*Net loss* was $11.0 million ($0.06 per share) compared to *Net income* of $14.5 million ($0.09 per share). The *Net loss* is primarily due to a $9.3 million loss on debt extinguishment, lower average realized silver and gold prices and higher all-in sustaining costs per silver equivalent ounce, partially offset by lower interest expense and a $2.3 million gain on the repurchase the Rochester royalty obligation.

### Revenue

Metal sales decreased due to lower gold production and a decrease in average realized silver and gold prices of 2% and 4%, respectively. The Company sold 4.1 million silver ounces and 86,194 gold ounces, compared to sales of 4.0 million silver ounces and 88,543 gold ounces. Gold contributed 60% of sales and silver contributed 40%, compared to 62% of sales from gold and 38% from silver. Metal sales from North American operations provided 85.7% of consolidated revenue, compared to 85.0%.

### Costs Applicable to Sales

Costs applicable to sales increased due to lower production and higher mining and processing costs. For a complete discussion of costs applicable to sales, see *Results of Operations* below.

### Amortization

Amortization decreased $4.6 million, or 12%, primarily due to lower production and increased life of mine reserves at Wharf.

### Expenses

General and administrative expenses decreased 5% due to lower legal and professional service costs.

Exploration expense increased $5.6 million, due to the Company’s expansion of drilling activities at Palmarejo, Kensington and Rochester as well as regional exploration with a focus on projects in Nevada and Chihuahua, Mexico.

Pre-development, reclamation, and other expenses remained comparable at $4.4 million.

### Other Income and Expenses

During the second quarter of 2017, the Company incurred a $9.3 million loss in connection with the repurchase of the 2021 7.875% Senior Notes concurrent with the completed offering of the 2024 5.875% Senior Notes.

Non-cash fair value adjustments, net, were a gain of $0.3 million compared to a loss of $3.6 million, primarily due to the termination of the Palmarejo gold production royalty (in the third quarter of 2016) and the lesser impact of changes in future metal prices on the Rochester royalty obligation which was repurchased and terminated in May 2017.

Interest expense (net of capitalized interest of $0.8 million) decreased to $3.7 million from $10.9 million, primarily due to lower debt levels and a lower interest rate on the 2024 Senior Notes.

Other, net increased by $6.0 million, primarily due to a $2.3 million gain on the repurchase of the Rochester royalty obligation and foreign exchange gains.

### Income and Mining Taxes

During the second quarter of 2017, the Company reported estimated income and mining tax benefit of approximately $2.1 million resulting in an effective tax rate of 16.1%. This compares to estimated income and mining tax benefit of $0.8 million for an effective tax rate of (5.6%) during the second quarter of 2016.

The following table summarizes the components of the Company’s income (loss) before tax and income and mining tax (expense) benefit:

*In thousands*

|  | Three months ended June 30, 2017 Income (loss) before tax | Tax (expense) benefit | 2016 Income (loss) before tax | Tax (expense) benefit |
| --- | ---: | ---: | ---: | ---: |
| United States | $(6,493) | $1,588 | $119 | $(1,810) |
| Argentina | (129) | 945 | 4,453 | (1,793) |
| Mexico | (2,195) | (4,766) | 3,353 | 4,316 |
| Bolivia | (2,001) | 245 | 4,016 | 848 |
| Other jurisdictions | (2,235) | 4,086 | 1,788 | (793) |
|  | $(13,053) | $2,098 | $13,729 | $768 |

The Company’s effective tax rate is impacted by recurring and nonrecurring items. These items include foreign exchange rates on deferred tax balances, mining taxes, uncertain tax positions, and a full valuation allowance on deferred tax assets related to losses in the United States and certain foreign jurisdictions. During the second quarter of 2017, changes in currency rates increased income and mining tax expense by $3.0 million, predominately due to the strength of the Mexican Peso. Favorable operating results at Palmarejo continued to contribute to higher income and mining tax expense. The Company’s consolidated effective income and mining tax rate is a function of the combined effective tax rates and foreign exchange rates in the jurisdictions in which it operates. Variations in the jurisdictional mix of income and loss and foreign exchange rates result in significant fluctuations in our consolidated effective tax rate.

A valuation allowance is provided for deferred tax assets for which it is more likely than not that the related benefits will not be realized. The Company analyzes its deferred tax assets and if it is determined that the Company will not realize all or a portion of its deferred tax assets, it will record or increase a valuation allowance. Conversely, if it is determined that the Company will ultimately be able to realize all or a portion of the related benefits for which a valuation allowance has been provided, all or a portion of the related valuation allowance will be reduced. There are a number of risk factors that could impact the Company’s ability to realize its deferred tax assets.

### Six Months Ended June 30, 2017 compared to Six Months Ended June 30, 2016

### Net Income (Loss)

*Net income* was $7.7 million ($0.04 per share) compared to *Net loss* of $5.9 million ($0.04 per share). The increase in *Net income* is primarily due to a $21.1 million gain on the sale of the Joaquin project, less unfavorable fair value adjustments, higher silver and gold production, higher average realized silver prices and lower interest expense, partially offset by lower average realized gold prices, higher all-in sustaining costs per silver equivalent ounce and a $9.3 million loss incurred in connection with the repurchase of the 2021 Senior Notes.

### Revenue

Metal sales increased due to higher silver and gold production, a reduction in metal inventory and a 6% increase in average realized silver prices, partially offset by a 4% decrease in average realized gold prices. The Company sold 8.6 million silver ounces and 197,068 gold ounces, compared to sales of 7.5 million silver ounces and 167,634 gold ounces. Gold contributed 61% of sales and silver contributed 39%, compared to 62% of sales from gold and 38% from silver. Royalty revenue was lower due to the Company’s divestiture of non-core royalty assets throughout 2016 and the first half of 2017. Metal sales from North American operations provided 87.9% of revenue, compared to 84.4%.

### Costs Applicable to Sales

Costs applicable to sales increased due to higher silver equivalent ounces sold and higher mining and processing costs. For a complete discussion of costs applicable to sales, see *Results of Operations* below.

### Amortization

Amortization increased $7.6 million, or 12%, primarily due to higher silver and gold ounces sold, partially offset by higher life of mine reserves at Wharf.

### Expenses

General and administrative expenses increased 10% due to higher compensation, severance and professional service costs.

Exploration expense increased $9.1 million, due to the Company’s expansion of drilling activities at Palmarejo, Kensington and Rochester as well as regional exploration with a focus on projects in Nevada and Chihuahua, Mexico.

Pre-development, reclamation, and other expenses increased 4% to $8.9 million as a result of additional work at La Preciosa.

### Other Income and Expenses

During the first half of 2017, the Company incurred a $9.3 million loss in connection with the repurchase of the 2021 7.875% Senior Notes concurrent with the completed offering of the 2024 5.875% Senior Notes.

Non-cash fair value adjustments, net, were a loss of $0.9 million compared to a loss of $12.3 million, primarily due to the termination of the Palmarejo gold production royalty (in the third quarter of 2016) and the lesser impact of changes in future metal prices on the Rochester royalty obligation which was repurchased and terminated in May 2017.

Interest expense (net of capitalized interest of $1.1 million) decreased to $7.3 million from $22.0 million, primarily due to lower debt levels and a lower interest rate on the 2024 Senior Notes compared to the 2021 Senior Notes.

Other, net increased by $25.8 million, primarily due to a $21.1 million gain on the sale of the Joaquin project in Argentina and a $2.3 million gain on the repurchase of the Rochester royalty obligation.

### Income and Mining Taxes

During the first half of 2017, the Company reported estimated income and mining tax expense of approximately $8.9 million resulting in an effective tax rate of 53.7%. This compares to estimated income and mining tax expense of $1.3 million for an effective tax rate of (29.3%) during the first half of 2016.

The following table summarizes the components of the Company’s income (loss) before tax and income and mining tax (expense) benefit:

*In thousands*

|  | Six months ended June 30, 2017 Income (loss) before tax | Tax (expense) benefit | 2016 Income (loss) before tax | Tax (expense) benefit |
| --- | ---: | ---: | ---: | ---: |
| United States | $14,221 | $(377) | $(9,242) | $(2,342) |
| Argentina | (457) | 2,070 | 3,438 | (250) |
| Mexico | 6,455 | (14,689) | (4,155) | 4,333 |
| Bolivia | (1,530) | 214 | 6,062 | (722) |
| Other jurisdictions | (2,033) | 3,834 | (664) | (2,357) |
|  | $16,656 | $(8,948) | $(4,561) | $(1,338) |

The Company’s effective tax rate is impacted by recurring and nonrecurring items. These items include foreign exchange rates on deferred tax balances, mining taxes, uncertain tax positions, and a full valuation allowance on deferred tax assets related to losses in the United States and certain foreign jurisdictions. During the first half of the year, changes in currency rates increased income and mining tax expense by $8.6 million, predominately due to the strength of the Mexican Peso. During the first half of the year, favorable operating results at Palmarejo contributed to higher income and mining tax expense. The Company’s consolidated effective income and mining tax rate is a function of the combined effective tax rates and foreign exchange rates in the jurisdictions in which it operates. Variations in the jurisdictional mix of income and loss and foreign exchange rates result in significant fluctuations in our consolidated effective tax rate.

A valuation allowance is provided for deferred tax assets for which it is more likely than not that the related benefits will not be realized. The Company analyzes its deferred tax assets and if it is determined that the Company will not realize all or a portion of its deferred tax assets, it will record or increase a valuation allowance. Conversely, if it is determined that the Company will ultimately be able to realize all or a portion of the related benefits for which a valuation allowance has been provided, all or a portion of the related valuation allowance will be reduced. There are a number of risk factors that could impact the Company’s ability to realize its deferred tax assets.

### 2017 Outlook

The Company revised its full-year 2017 production guidance to reflect higher expected gold production at Wharf due to higher mining and crushing rates, lower expected silver production at the San Bartolomé mine due to persistent drought conditions, and the pending sale of the Endeavor silver stream, under which production and any associated sales began accruing to the buyer as of June 1, 2017. Cost guidance has been updated to reflect revised production levels.

### 2017 Production Outlook

*(silver and silver equivalent ounces in thousands)*

| Palmarejo Rochester | Silver 6,500 - 7,000 4,200 - 4,700 | Gold 110,000 - 120,000 47,000 - 52,000 | Silver Equivalent1 13,100 - 14,200 7,020 - 7,820 |
| --- | ---: | --- | --- |
| **San Bartolomé** | 5,000 - 5,400 | — | 5,000 - 5,400 |
| **Endeavor** | 105 | — | 105 |
| **Kensington** | — | 120,000 - 125,000 | 7,200 - 7,500 |
| **Wharf** | — | 90,000 - 95,000 | 5,400 - 5,700 |
| **Total** | 15,805 - 17,205 | 367,000 - 392,000 | 37,825 - 40,725 |

### 2017 Cost Outlook

*(dollars in millions, except per ounce amounts)*

|  | Previous Guidance | Revised Guidance |
| --- | --- | --- |
| **CAS per AgEqOz1 – Palmarejo** | $10.00 - $10.50 | $10.00 - $10.50 |
| **CAS per AgEqOz1 – Rochester** | $11.50 - $12.00 | $11.50 - $12.00 |
| **CAS per AgOz1 – San Bartolomé** | $14.00 - $14.50 | $15.75 - $16.25 |
| **CAS per AuOz1 – Kensington** | $800 - $850 | $800 - $850 |
| **CAS per AuEqOz1 – Wharf** | $775 - $825 | $700 - $750 |
| **Capital Expenditures** | $109 - $129 | $109 - $129 |
| **General and Administrative Expenses** | $28 - $32 | $28 - $32 |
| **Exploration Expense** | $29 - $31 | $29 - $31 |
| **AISC per AgEqOz1** | $15.75 - $16.25 | $15.75 - $16.25 |

(1) See “Non-GAAP Financial Performance Measures.”

### Results of Operations

The Company produced 4.0 million ounces of silver and 82,819 ounces of gold in the three months ended June 30, 2017, compared to 4.0 million ounces of silver and 92,727 ounces of gold in the three months ended June 30, 2016. Gold production decreased 11% due to lower tons placed at Rochester and lower gold grade at Wharf, Kensington and Palmarejo, partially offset by higher mill throughput and recovery at Palmarejo.

The Company produced 7.9 million ounces of silver and 171,037 ounces of gold in the six months ended June 30, 2017, compared to 7.4 million ounces of silver and 170,799 ounces of gold in the six months ended June 30, 2016. Silver production increased 7% due to higher mill throughput and grade at Palmarejo and timing of leach pad recoveries at Rochester, partially offset by lower mill throughput and silver grade at San Bartolomé.

Costs applicable to sales were $13.15 per silver equivalent ounce ($12.23 per average spot silver equivalent ounce) and $866 per gold equivalent ounce in the three months ended June 30, 2017 compared to $10.82 per silver equivalent ounce ($10.00 per average spot silver equivalent ounce) and $649 per gold equivalent ounce in the three months ended June 30, 2016. Costs applicable to sales per silver equivalent ounce increased 22% in the three months ended June 30, 2017 due to higher unit costs at Palmarejo, Rochester and San Bartolomé. Costs applicable to sales per gold equivalent ounce increased 33% in the three months ended June 30, 2017 due to higher unit costs at Kensington and Wharf.

Costs applicable to sales were $12.18 per silver equivalent ounce ($11.33 per average spot silver equivalent ounce) and $825 per gold equivalent ounce in the six months ended June 30, 2017 compared to $11.53 per silver equivalent ounce ($10.58 per average spot silver equivalent ounce) and $688 per gold equivalent ounce in the six months ended June 30, 2016. Costs applicable to sales per silver equivalent ounce increased 6% in the six months ended June 30, 2017 due to higher unit costs at Palmarejo, Rochester and San Bartolomé. Costs applicable to sales per gold equivalent ounce increased 20% in the six months ended June 30, 2017 due to higher unit costs at Kensington and Wharf.

All-in sustaining costs were $17.83 per silver equivalent ounce ($15.90 per average spot silver equivalent ounce) in the three months ended June 30, 2017, compared to $14.92 per silver equivalent ounce ($13.04 per average spot silver equivalent ounce) in the three months ended June 30, 2016. The 20% increase in all-in sustaining costs per silver equivalent ounce in 2017 was primarily due to higher costs applicable to sales and higher exploration expense, partially offset by lower general and administrative expense and lower sustaining capital.

All-in sustaining costs were $16.29 per silver equivalent ounce ($14.67 per average spot silver equivalent ounce) in the six months ended June 30, 2017, compared to $15.56 per silver equivalent ounce ($13.37 per average spot silver equivalent ounce) in the six months ended June 30, 2016. The 5% increase in all-in sustaining costs per silver equivalent ounce in 2017 was primarily due to higher costs applicable to sales and higher general and administrative and exploration expense, partially offset by lower sustaining capital.

### Palmarejo

|  | Three months ended June 30, 2017 | 2016 | Six months ended June 30, 2017 | 2016 |
| --- | ---: | ---: | ---: | ---: |
| Tons milled | 335,428 | 270,142 | 695,811 | 516,675 |
| Silver ounces produced | 1,456,821 | 1,307,097 | 2,987,362 | 2,240,466 |
| Gold ounces produced | 24,292 | 18,731 | 55,084 | 33,399 |
| Silver equivalent ounces produced | 2,914,341 | 2,430,957 | 6,292,402 | 4,244,406 |
| Costs applicable to sales per silver equivalent oz(1) | $11.31 | $9.14 | $10.36 | $10.44 |
| Costs applicable to sales per average spot silver equivalent oz(1) | $10.20 | $8.20 | $9.40 | $9.23 |

(1) See Non-GAAP Financial Performance Measures.

#### Three Months Ended June 30, 2017 compared to Three Months Ended June 30, 2016

Silver equivalent production increased 20% due to higher mining rates from Independencia, partially offset by lower silver grade. Metal sales were $53.2 million, or 31% of Coeur’s metal sales, compared with $48.3 million, or 27% of Coeur’s metal sales. Costs applicable to sales per ounce increased 24% as a result of higher waste tons mined, backfill costs, equipment maintenance and consumable costs. Amortization remained comparable at $14.4 million. Capital expenditures were $11.2 million as the Company continues underground development at Guadalupe and Independencia.

#### Six Months Ended June 30, 2017 compared to Six Months Ended June 30, 2016

Silver equivalent production increased 48% due to higher mining rates from Guadalupe and Independencia and higher silver and gold grades, partially offset by lower silver recovery. Metal sales were $130.9 million, or 35% of Coeur’s metal sales, compared with $78.1 million, or 24% of Coeur’s metal sales. Costs applicable to sales per ounce remained comparable. Amortization increased to $34.6 million compared to $22.1 million, primarily due to higher production from Guadalupe and Independencia. Capital expenditures remained comparable at $17.4 million.

### Rochester

|  | Three months ended June 30, 2017 | 2016 | Six months ended June 30, 2017 | 2016 |
| --- | ---: | ---: | ---: | ---: |
| Tons placed | 4,493,100 | 6,402,013 | 8,006,808 | 10,776,472 |
| Silver ounces produced | 1,156,341 | 1,197,013 | 2,283,663 | 2,125,915 |
| Gold ounces produced | 10,745 | 13,940 | 21,101 | 24,401 |
| Silver equivalent ounces produced | 1,801,041 | 2,033,413 | 3,549,723 | 3,589,975 |
| Costs applicable to sales per silver equivalent oz(1) | $13.62 | $11.36 | $13.05 | $11.98 |
| Costs applicable to sales per average spot silver equivalent oz(1) | $12.63 | $10.30 | $12.17 | $10.75 |

(1) See Non-GAAP Financial Performance Measures.

#### Three Months Ended June 30, 2017 compared to Three Months Ended June 30, 2016

Silver equivalent production decreased 11% due to lower tons placed, partially offset by the timing of recoveries. Metal sales were $32.8 million, or 19% of Coeur’s metal sales, compared with $35.8 million, or 20% of Coeur’s metal sales. Costs applicable to sales per silver equivalent ounce increased 20% due to higher waste tons mined and higher blasting and processing costs. Amortization decreased to $4.9 million compared to $5.4 million due to lower production. Capital expenditures increased to $13.8 million compared to $3.9 million due to the stage IV leach pad expansion.

#### Six Months Ended June 30, 2017 compared to Six Months Ended June 30, 2016

Silver equivalent production was consistent. Metal sales were $71.8 million, or 19% of Coeur’s metal sales, compared with $65.7 million, or 20% of Coeur’s metal sales. Costs applicable to sales per silver equivalent ounce increased 9% due to higher waste tons mined and higher blasting, processing, and maintenance costs. Amortization remained comparable at $10.8 million. Capital expenditures increased to $24.4 million compared to $7.2 million due to the stage IV leach pad expansion.

### Kensington

|  | Three months ended June 30, 2017 | 2016 | Six months ended June 30, 2017 | 2016 |
| --- | ---: | ---: | ---: | ---: |
| Tons milled | 163,163 | 157,117 | 329,058 | 316,477 |
| Gold ounces produced | 26,424 | 32,210 | 52,621 | 64,183 |
| Costs applicable to sales/oz(1) | $964 | $749 | $922 | $761 |

(1) See Non-GAAP Financial Performance Measures.

#### Three Months Ended June 30, 2017 compared to Three Months Ended June 30, 2016

Gold production decreased 18% due to lower grades mined as a result of mine sequencing, partially offset by higher mill throughput. Metal sales were $35.6 million, or 21% of Coeur’s metal sales, compared to $36.5 million, or 20% of Coeur’s metal sales. Costs applicable to sales per ounce were 29% higher, primarily due to lower production and higher contract services. Amortization was $8.3 million compared to $9.8 million due to lower production, partially offset by higher amortizable mining properties and equipment. Capital expenditures increased to $8.6 million compared to $7.5 million, due to more underground mine development.

#### Six Months Ended June 30, 2017 compared to Six Months Ended June 30, 2016

Gold production decreased 18% due to lower grades mined as a result of mine sequencing, partially offset by higher mill throughput. Metal sales were $73.5 million, or 19% of Coeur’s metal sales, compared to $72.2 million, or 22% of Coeur’s metal sales. Costs applicable to sales per ounce were 21% higher, primarily due to lower production and higher contract services and other mining costs. Amortization was $17.5 million compared to $18.2 million due to lower production, mostly offset by higher amortizable mining properties and equipment. Capital expenditures decreased to $14.2 million compared to $15.6 million, due to less underground mine development.

### Wharf

|  | Three months ended June 30, 2017 | 2016 | Six months ended June 30, 2017 | 2016 |
| --- | ---: | ---: | ---: | ---: |
| Tons placed | 993,167 | 915,631 | 2,285,348 | 1,890,294 |
| Gold ounces produced | 21,358 | 27,846 | 42,231 | 48,816 |
| Silver ounces produced | 12,587 | 35,201 | 32,652 | 48,180 |
| Gold equivalent ounces produced(1) | 21,568 | 28,433 | 42,775 | 49,619 |
| Costs applicable to sales per gold equivalent oz(1) | $734 | $535 | $696 | $597 |

(1) See Non-GAAP Financial Performance Measures.

#### Three Months Ended June 30, 2017 compared to Three Months Ended June 30, 2016

Gold equivalent production decreased 24% due to fewer high-grade tons placed from the Golden Reward deposit. Metal sales were $27.0 million, or 16% of Coeur’s metal sales, compared to $34.0 million, or 19% of Coeur’s metal sales. Costs applicable to sales per gold equivalent ounce increased 37% due to lower production, timing of pad unload, and higher blasting and crushing costs. Amortization was $2.5 million compared to $5.1 million due to lower production and higher life of mine reserves. Capital expenditures remained comparable at $1.5 million.

#### Six Months Ended June 30, 2017 compared to Six Months Ended June 30, 2016

Gold equivalent production decreased 14% due to lower grade, partially offset by higher tons placed. Metal sales were $57.3 million, or 15% of Coeur’s metal sales, compared to $61.9 million, or 19% of Coeur’s metal sales. Costs applicable to sales per gold equivalent ounce increased 17% due to lower production and higher blasting and crushing costs. Amortization was $5.7 million compared to $9.2 million due to lower production and higher life of mine reserves. Capital expenditures remained comparable at $2.4 million.

### San Bartolomé

|  | Three months ended June 30, 2017 | 2016 | Six months ended June 30, 2017 | 2016 |
| --- | ---: | ---: | ---: | ---: |
| Tons milled | 417,784 | 440,441 | 802,051 | 848,247 |
| Silver ounces produced | 1,284,561 | 1,457,944 | 2,499,068 | 2,839,857 |
| Costs applicable to sales/oz(1) | $16.73 | $13.14 | $16.34 | $12.89 |

(1) See Non-GAAP Financial Performance Measures.

#### Three Months Ended June 30, 2017 compared to Three Months Ended June 30, 2016

Silver production decreased 12% due to lower high-grade ore purchases and mill throughput due to continued drought conditions, partially offset by higher recoveries. Silver sales were $23.8 million, or 14% of Coeur’s metal sales, compared with $25.2 million, or 14% of Coeur’s metal sales. Costs applicable to sales per ounce increased due to lower production and higher processing costs. Amortization remained comparable at $2.2 million due to lower life of mine reserves. Capital expenditures were $0.4 million compared to $1.3 million.

#### Six Months Ended June 30, 2017 compared to Six Months Ended June 30, 2016

Silver production decreased 12% due to lower high-grade ore purchases and mill throughput due to drought conditions, partially offset by higher recoveries. Silver sales were $44.4 million, or 12% of Coeur’s metal sales, compared with $46.5 million, or 14% of Coeur’s metal sales. Costs applicable to sales per ounce increased due to lower production and higher processing costs. Amortization remained comparable at $3.6 million due to lower life of mine reserves. Capital expenditures were $0.8 million compared to $1.8 million.

### Endeavor Silver Stream

|  | Three months ended June 30, 2017 | 2016 | Six months ended June 30, 2017 | 2016 |
| --- | ---: | ---: | ---: | ---: |
| Tons milled | 88,565 | 37,521 | 133,905 | 124,384 |
| Silver ounces produced | 64,672 | 32,721 | 104,613 | 148,032 |
| Costs applicable to sales/oz(1) | $7.06 | $7.94 | 7.12 | 5.93 |

(1) See Non-GAAP Financial Performance Measures.

In June 2017, the Company entered into a Share and Asset Purchase Agreement with Metalla Streaming & Royalty Ltd. to sell the Endeavor silver stream. The transaction is expected to close in the third quarter of 2017, subject to customary closing conditions. Reported production and financial results include operations through May 2017, as the buyer is entitled to production and any associated sales subject to the stream agreement after June 1, 2017 under the terms of the sale agreement.

#### Three Months Ended June 30, 2017 compared to Three Months Ended June 30, 2016

Silver production at Endeavor increased due to higher mining and mill throughput rates. Costs applicable to sales per ounce decreased due to the impact of lower silver prices on the Company’s silver price sharing agreement with the Endeavor mine operator. Amortization was $0.2 million compared to $0.1 million due to higher production.

#### Six Months Ended June 30, 2017 compared to Six Months Ended June 30, 2016

Silver production at Endeavor decreased due to lower grades. Costs applicable to sales per ounce increased due to the impact of higher silver prices on the Company’s silver price sharing agreement with the Endeavor mine operator. Amortization was $0.3 million compared to $0.9 million due to lower production and lower amortizable mining properties.

### Liquidity and Capital Resources

### Cash Provided by Operating Activities

Net cash provided by operating activities for the three and six months ended June 30, 2017 was $29.3 million and $84.6 million, respectively, compared to net cash provided by operating activities of $45.9 million and $52.6 million, respectively, for the three and six months ended June 30, 2016 and was impacted by the following key factors:

|  | Three months ended June 30, 2017 | 2016 | Six months ended June 30, 2017 | 2016 |
| --- | ---: | ---: | ---: | ---: |
| Consolidated silver equivalent ounces sold | 9,258,455 | 9,286,033 | 20,384,641 | 17,561,045 |
| Average realized price per consolidated silver equivalent ounce | $18.72 | $19.41 | $18.62 | $18.61 |
| Costs applicable to sales per consolidated silver equivalent ounce (1) | (13.57) | (10.82) | (12.67) | (11.50) |
| Operating margin per consolidated silver equivalent ounce | $5.15 | $8.59 | $5.95 | $7.11 |

(1) See Non-GAAP Financial Performance Measures.

*In thousands*

|  | Three months ended June 30, 2017 | 2016 | Six months ended June 30, 2017 | 2016 |
| --- | ---: | ---: | ---: | ---: |
| Cash flow before changes in operating assets and liabilities | $27,357 | $47,496 | $71,184 | $70,749 |
| Changes in operating assets and liabilities: |  |  |  |  |
| Receivables | (1,916) | (12,402) | 11,190 | (8,921) |
| Prepaid expenses and other | 3,612 | (898) | (687) | 381 |
| Inventories | (997) | (7,686) | 13,295 | (15,508) |
| Accounts payable and accrued liabilities | 1,223 | 19,429 | (10,432) | 5,855 |
| CASH PROVIDED BY OPERATING ACTIVITIES | $29,279 | $45,939 | $84,550 | $52,556 |

Cash provided by operating activities decreased $16.7 million for the three months ended June 30, 2017 compared to the three months ended June 30, 2016 due to lower silver equivalent ounces sold, lower average realized prices and higher costs applicable to sales per consolidated silver equivalent ounce, partially offset by favorable working capital adjustments. Metal sales for the three months ended June 30, 2017 decreased $6.8 million, with $0.9 million due to lower silver equivalent ounces sold and $5.9 million due to lower average realized prices. The $1.9 million working capital decrease in the three months ended June 30, 2017 was primarily due to an increase in accounts payable partially offset by an increase in receivables, compared to the $1.6 million working capital increase in the three months ended June 30, 2016 due to an increase in trade receivables and inventories, partially offset by an increase in accounts payable.

Cash provided by operating activities increased $32.0 million for the six months ended June 30, 2017 compared to the six months ended June 30, 2016 due to higher silver equivalent ounces sold and favorable working capital adjustments, partially offset by higher costs applicable to sales per consolidated silver equivalent ounce. Metal sales for six months ended June 30, 2017 increased $52.7 million, with $52.9 million due to higher silver equivalent ounces sold, partially offset by $0.2 million due to lower average realized prices. The $13.4 million working capital decrease in the six months ended June 30, 2017 was primarily due to the reduction in precious metal inventory and receivables, compared to the $18.2 million working capital increase in the six months ended June 30, 2016, primarily due to an increase in inventories and receivables, partially offset by an increase in accounts payable.

### Cash Used in Investing Activities

Net cash used in investing activities in the three months ended June 30, 2017 was $45.2 million compared to $16.9 million in the three months ended June 30, 2016, primarily due to higher capital expenditures, the purchase of strategic equity investments, and the sales of non-core assets in 2016. The Company had capital expenditures of $37.5 million in the three months ended June 30, 2017 compared with $23.3 million in the three months ended June 30, 2016. Capital expenditures in the three months ended June 30, 2017 were primarily related to underground development at Palmarejo and Kensington, and the Stage IV leach pad expansion at Rochester. Capital expenditures in the three months ended June 30, 2016 were primarily related to underground development at Palmarejo and Kensington.

Net cash used in investing activities in the six months ended June 30, 2017 was $46.7 million compared to $35.5 million in the six months ended June 30, 2016, primarily due to higher capital expenditures and the purchase of strategic equity investments, partially offset by the proceeds from the sale of the Joaquin project. The Company had capital expenditures of $61.5 million in the six months ended June 30, 2017 compared with $45.5 million in the six months ended June 30, 2016. Capital expenditures in the six months ended June 30, 2017 were primarily related to underground development at Palmarejo and Kensington, and the Stage IV leach pad expansion at Rochester. Capital expenditures in the six months ended June 30, 2016 were primarily related to underground development at Palmarejo and Kensington.

### Cash Provided by Financing Activities

Net cash provided by financing activities in the three months ended June 30, 2017 remained comparable with the three months ended June 30, 2016 at $55.6 million. During the three months ended June 30, 2017, the Company received net proceeds of approximately $245.0 million from the issuance of the 2024 Senior Notes, partially offset by the repurchase of the 2021 Senior Notes for $185.5 million, including premiums. In addition, the Company made payments of $10.5 million under the Palmarejo gold production royalty obligation that terminated in July 2016. Coeur Mexicana now sells 50% of Palmarejo gold production (excluding production from Independencia Este, acquired in the 2015 Paramount transaction) for the lesser of $800 or spot price per ounce under a gold stream agreement.

Net cash provided by financing activities in the six months ended June 30, 2017 was $49.1 million compared to $40.1 million in the six months ended June 30, 2016. During the six months ended June 30, 2017, the Company received net proceeds of approximately $245.0 million from the issuance of the 2024 Senior Notes, partially offset by the repurchase of the 2021 Senior Notes for $185.5 million, including premiums. Payments of $19.6 million were made in 2016 under the Palmarejo gold production royalty that terminated in July 2016. Coeur Mexicana now sells 50% of Palmarejo gold production (excluding production from Independencia Este, acquired in 2015 Paramount transaction) for the lesser of $800 or spot price per ounce under a gold stream agreement.

In May 2017, the Company completed an offering of $250.0 million in aggregate principal amount of 2024 Senior Notes in a private placement conducted pursuant to Rule 144A and Regulation S under the Securities Act of 1933, as amended for net proceeds of approximately $245.0 million. The 2024 Senior Notes are governed by an Indenture dated as of May 31, 2017 (the “Indenture”), among the Company, as issuer, certain of the Company's subsidiaries named therein, as guarantors thereto (the “Guarantors”), and the Bank of New York Mellon, as trustee. The 2024 Senior Notes bear interest at a rate of 5.875% per year from the date of issuance. Interest on the 2024 Senior Notes is payable semi-annually in arrears on June 1 and December 1 of each year, commencing on December 1, 2017. The 2024 Senior Notes will mature on June 1, 2024 and are fully and unconditionally guaranteed by the Guarantors. At any time prior to June 1, 2020, the Company may redeem all or part of the 2024 Senior Notes upon not less than 30 nor more than 60 days’ prior notice at a redemption price equal to the sum of (i) 100% of the principal amount thereof, plus (ii) a make-whole premium as of the date of redemption, plus (iii) accrued and unpaid interest and additional interest, if any, thereon, to the date of redemption. In addition, the Company may redeem some or all of the 2024 Senior Notes on or after June 1, 2020, at redemption prices set forth in the Indenture, together with accrued and unpaid interest. At any time prior to June 1, 2020, the Company may use the proceeds of certain equity offerings to redeem up to 35% of the aggregate principal amount of the 2024 Senior Notes, including any permitted additional 2024 Senior Notes, at a redemption price equal to 105.875% of the principal amount. The Indenture contains covenants that, among other things, limit the Company’s ability under certain circumstances to incur additional indebtedness, pay dividends or make other distributions or repurchase or redeem capital stock, prepay, redeem or repurchase certain debt, make loans and investments, create liens, sell, transfer or otherwise dispose of assets, enter into transactions with affiliates, enter into agreements restricting the Company's subsidiaries' ability to pay dividends and impose conditions on the Company’s ability to engage in mergers, consolidations and sales of all or substantially all of its assets. The Indenture also contains certain “Events of Default” (as defined in the Indenture) customary for indentures of this type. If an

Event of Default has occurred and is continuing, the Trustee or the holders of not less than 25% in aggregate principal amount of the 2024 Senior Notes then outstanding may, and the Trustee at the request of the holders of not less than 25% in aggregate principal amount of the 2024 Senior Notes then outstanding shall, declare all unpaid principal of, premium, if any, and accrued interest on all the 2024 Senior Notes to be due and payable.

In connection with the sale of the 2024 Senior Notes, the Company entered into a Registration Rights Agreement, dated as of May 31, 2017 (the “Registration Rights Agreement”), with the Guarantors and the initial purchaser of the 2024 Senior Notes. Under the Registration Rights Agreement, the Company and the Guarantors have agreed, to (i) file a registration statement (the “Exchange Offer Registration Statement”) with the United States Securities and Exchange Commission (the “SEC”) with respect to a registered offer (the “Exchange Offer”) to exchange the 2024 Senior Notes for new notes of the Company having terms substantially identical in all material respects to the 2024 Senior Notes (the “Exchange Notes”), (ii) to use their commercially reasonable efforts to cause the Exchange Offer to be completed on or prior to November 27, 2017 and (iii) to commence the Exchange Offer and use their commercially reasonable efforts to issue on or prior to 35 business days, or longer, if required by applicable securities laws, after the date on which the Exchange Offer Registration Statement was declared effective by the SEC, the Exchange Notes in exchange for all 2024 Senior Notes tendered prior thereto in the Exchange Offer.

Concurrent with the offering of the 2024 Senior Notes, the Company commenced a cash tender offer (the “Tender Offer”) to purchase the outstanding $178.0 million in aggregate principal amount of its 2021 Senior Notes. The Tender Offer was made on the terms and subject to the conditions set forth in the Offer to Purchase dated May 19, 2017. The Tender Offer expired at 5:00 p.m., New York City time, on May 25, 2017 (the “Expiration Time”). Holders of the 2021 Senior Notes who tendered (and did not validly withdraw) their notes at or prior to the Expiration Time were entitled to receive in cash $1,043.88 per $1,000 principal amount of 2021 Senior Notes validly tendered (and not validly withdrawn) and accepted for purchase by the Company in the Tender Offer, plus accrued and unpaid interest on such 2021 Senior Notes. $118.1 million aggregate principal amount of the 2021 Senior Notes were validly tendered and purchased by the Company on May 31, 2017. In accordance with the terms of the indenture governing the 2021 Senior Notes, the remaining $59.9 million aggregate principal amount of the Notes that were not tendered were redeemed on June 30, 2017 at the redemption price specified in the indenture governing the 2021 Senior Notes ($1,039.38 per $1,000 principal amount redeemed, plus accrued and unpaid interest). The Company recorded a loss of $9.3 million as a result of the extinguishment of the 2021 Senior Notes.

### Other Liquidity Matters

We believe that our liquidity and capital resources from U.S. operations are adequate to fund our U.S. operations and corporate activities. The Company has asserted indefinite reinvestment of earnings from its Mexican operations as determined by management’s judgment about and intentions concerning the future operations of the Company. The Company does not believe that the amounts reinvested will have a material impact on liquidity.

### Critical Accounting Policies and Accounting Developments

Please see Note 2 – SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES contained in the Company’s Form

10-K for the year ended December 31, 2016 (the “2016 10-K”) for the Company’s critical accounting policies and estimates. Those critical accounting policies and estimates have been supplemented and updated in this Form 10-Q.

### Non-GAAP Financial Performance Measures

Non-GAAP financial measures are intended to provide additional information only and do not have any standard meaning prescribed by generally accepted accounting principles (“GAAP”). These measures should not be considered in isolation or as a substitute for performance measures prepared in accordance with GAAP.

### Adjusted Net Income (Loss)

Management uses *Adjusted net income (loss)* to evaluate the Company’s operating performance, and to plan and forecast its operations. The Company believes the use of *Adjusted net income (loss)* reflects the underlying operating performance of our core mining business and allows investors and analysts to compare results of the Company to similar results of other mining companies. Management’s determination of the components of *Adjusted net income (loss*) are evaluated periodically and are based, in part, on a review of non-GAAP financial measures used by mining industry analysts. The tax effect of adjustments are based on statutory tax rates and the Company’s tax attributes, including the impact through the Company’s valuation allowance. The combined effective rate of tax adjustments may not be consistent with the statutory tax rates or the Company’s effective tax rate due to jurisdictional tax attributes and related valuation allowance impacts which may minimize the tax effect of certain adjustments and may not apply to gains and losses equally. *Adjusted net income (loss)* is reconciled to *Net income (loss)* in the table below:

*In thousands except per share amounts*

|  | Three months ended June 30, 2017 | 2016 | Six months ended June 30, 2017 | 2016 |
| --- | ---: | ---: | ---: | ---: |
| Net income (loss) | $(10,955) | $14,497 | $7,708 | $(5,899) |
| Fair value adjustments, net | (336) | 3,579 | 864 | 12,274 |
| Impairment of marketable securities | 305 | 20 | 426 | 20 |
| Write-downs | — | — | — | 4,446 |
| Gain on sale of Joaquin project | — | — | (21,138) | — |
| (Gain) loss on sale of assets and securities | (513) | (3,126) | 1,552 | (4,211) |
| Gain on repurchase of Rochester royalty | (2,332) | — | (2,332) | — |
| Loss on debt extinguishment | 9,342 | — | 9,342 | — |
| Transaction costs | — | 792 | — | 1,172 |
| Foreign exchange loss (gain) | 1,972 | (2,810) | 6,240 | (3,933) |
| Tax effect of adjustments(1) | — | 3,996 | 1,807 | 2,621 |
| **Adjusted net income (loss)** | $(2,517) | $16,948 | $4,469 | $6,490 |
| **Adjusted net income (loss) per share - Basic** | $(0.01) | $0.11 | $0.02 | $0.04 |
| **Adjusted net income (loss) per share - Diluted** | $(0.01) | $0.11 | $0.02 | $0.04 |

(1) For the three months ended June 30, 2016, tax effect of adjustments of $4.0 million (-316%) is primarily related to the tax gain on the sale of an asset, partially offset by losses on other asset sales where no tax benefit was recognized and tax benefit from fair value adjustment.

For the six months ended June 30, 2017, tax effect of adjustments of $1.8 million (-16%) is primarily related to a taxable gain on the sale of the Joaquin project. For the six months ended June 30, 2016, tax effect of adjustments of $2.6 million (-19%) is primarily related to a taxable gain on the sale of assets and the tax valuation allowance impact from an asset write-down, partially offset by tax benefit from fair value adjustments.

### EBITDA and Adjusted EBITDA

Management uses *EBITDA* to evaluate the Company’s operating performance, to plan and forecast its operations, and assess leverage levels and liquidity measures. The Company believes the use of *EBITDA* reflects the underlying operating performance of our core mining business and allows investors and analysts to compare results of the Company to similar results of other mining companies. *Adjusted EBITDA* is a measure used in the Indenture to determine our ability to make certain payments and incur additional indebtedness. *EBITDA* and *Adjusted EBITDA* do not represent, and should not be considered an alternative to, *Net income (Loss)* or *Cash Flow from Operations* as determined under GAAP. Other companies may calculate *Adjusted EBITDA* differently and those calculations may not be comparable to our presentation. *Adjusted EBITDA* is reconciled to *Net income (loss)* in the table below:

*In thousands except per share amounts*

|  | Three months ended June 30, 2017 | 2016 | Six months ended June 30, 2017 | 2016 |
| --- | ---: | ---: | ---: | ---: |
| Net income (loss) | $(10,955) | $14,497 | $7,708 | $(5,899) |
| Interest expense, net of capitalized interest | 3,749 | 10,875 | 7,335 | 21,995 |
| Income tax provision (benefit) | (2,098) | (768) | 8,948 | 1,338 |
| Amortization | 32,946 | 37,505 | 73,050 | 65,470 |
| **EBITDA** | 23,642 | 62,109 | 97,041 | 82,904 |
| Fair value adjustments, net | (336) | 3,579 | 864 | 12,274 |
| Impairment of equity securities | 305 | 20 | 426 | 20 |
| Foreign exchange (gain) loss | (1,000) | 5,655 | (2,349) | 5,820 |
| Gain on sale of Joaquin project | — | — | (21,138) | — |
| (Gain) loss on sale of assets and securities | (513) | (3,126) | 1,552 | (4,211) |
| Gain on repurchase of Rochester royalty | (2,332) | — | (2,332) | — |
| Loss on debt extinguishment | 9,342 | — | 9,342 | — |
| Transaction costs | — | 792 | — | 1,172 |
| Asset retirement obligation accretion | 2,450 | 2,066 | 4,841 | 4,125 |
| Inventory adjustments and write-downs | 1,796 | 946 | 1,652 | 1,863 |
| Write-downs | — | — | — | 4,446 |
| **Adjusted EBITDA** | $33,354 | $72,041 | $89,899 | $108,413 |

### Costs Applicable to Sales and All-in Sustaining Costs

Management uses *Costs applicable to sales (“*CAS”) and *All-in sustaining costs (“*AISC”) to evaluate the Company’s current operating performance and life of mine performance from discovery through reclamation. We believe these measures assist analysts, investors and other stakeholders in understanding the costs associated with producing silver and gold, assessing our operating performance and ability to generate free cash flow from operations and sustaining production. These measures may not be indicative of operating profit or cash flow from operations as determined under GAAP. Management believes converting the benefit from selling gold into silver equivalent ounces best allows management, analysts, investors and other stakeholders to evaluate the operating performance of the Company. Other companies may calculate CAS and AISC differently as a result of reflecting the benefit from selling non-silver metals as a by-product credit rather than converting to silver equivalent ounces, differences in the determination of sustaining capital expenditures, and differences in underlying accounting principles and accounting frameworks such as in International Financial Reporting Standards.

### Three Months Ended June 30, 2017

*In thousands except per ounce amounts*

| Silver Palmarejo Rochester | San Bartolomé | Endeavor | Total | Gold Kensington | Wharf | Total | Total |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| **Costs applicable to sales, including amortization (U.S. GAAP)** $48,325 $29,099 | $25,604 | $586 | $103,614 | $36,335 | $18,317 | $54,652 | $158,266 |
| **Amortization** 14,431 4,938 | 2,212 | 168 | 21,749 | 8,347 | 2,549 | 10,896 | 32,645 |
| **Costs applicable to sales** $33,894 $24,161 | $23,392 | $418 | $81,865 | $27,988 | $15,768 | $43,756 | $125,621 |
| **Silver equivalent ounces sold** 2,995,623 1,774,000 | 1,398,038 | 59,234 | 6,226,895 |  |  |  | 9,258,455 |
| **Gold equivalent ounces sold** |  |  |  | 29,031 | 21,495 | 50,526 |  |
| **Costs applicable to sales per ounce** $11.31 $13.62 | $16.73 | $7.06 | **$13.15** | $964 | $734 | **$866** | $13.57 |
| **Costs applicable to sales per average spot ounce** $10.20 $12.63 |  |  | **$12.23** |  |  |  | $12.10 |
| **Costs applicable to sales** |  |  |  |  |  |  | $125,621 |
| **Treatment and refining costs** |  |  |  |  |  |  | 1,288 |
| **Sustaining capital(1)** |  |  |  |  |  |  | 17,569 |
| **General and administrative** |  |  |  |  |  |  | 7,042 |
| **Exploration** |  |  |  |  |  |  | 7,813 |
| **Reclamation** |  |  |  |  |  |  | 4,096 |
| **Project/pre-development costs** |  |  |  |  |  |  | 1,677 |
| **All-in sustaining costs** |  |  |  |  |  |  | **$165,106** |
| **Silver equivalent ounces sold** |  |  |  |  |  |  | 6,226,895 |
| **Kensington and Wharf silver equivalent ounces sold** |  |  |  |  |  |  | 3,031,560 |
| **Consolidated silver equivalent ounces sold** |  |  |  |  |  |  | 9,258,455 |
| **All-in sustaining costs per silver equivalent ounce** |  |  |  |  |  |  | **$17.83** |
| **Consolidated silver equivalent ounces sold (average spot)** |  |  |  |  |  |  | 10,384,025 |
| **All-in sustaining costs per average spot silver equivalent ounce** |  |  |  |  |  |  | **$15.90** |

(1) Excludes development capital for Jualin, Guadalupe South Portal and Rochester expansion permitting.

### Three Months Ended June 30, 2016

*In thousands except per ounce amounts*

| Silver Palmarejo Rochester | San Bartolomé | Endeavor | Total | Gold Kensington | Wharf | Total | Total |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| **Costs applicable to sales, including amortization (U.S. GAAP)** $37,630 $27,158 | $20,498 | $365 | $85,651 | $32,419 | $19,470 | $51,889 | $137,540 |
| **Amortization** 14,765 5,437 | 1,853 | 84 | 22,139 | 9,808 | 5,128 | 14,936 | 37,075 |
| **Costs applicable to sales** $22,865 $21,721 | $18,645 | $281 | $63,512 | $22,611 | $14,342 | $36,953 | $100,465 |
| **Silver equivalent ounces sold** 2,502,442 1,911,885 | 1,418,455 | 35,411 | 5,868,193 |  |  |  | 9,286,033 |
| **Gold equivalent ounces sold** |  |  |  | 30,178 | 26,786 | 56,964 |  |
| **Costs applicable to sales per ounce** $9.14 $11.36 | $13.14 | $7.94 | **$10.82** | $749 | $535 | **$649** | $10.82 |
| **Costs applicable to sales per average spot ounce** $8.20 $10.30 |  |  | **$10.00** |  |  |  | $9.45 |
| **Costs applicable to sales** |  |  |  |  |  |  | $100,465 |
| **Treatment and refining costs** |  |  |  |  |  |  | 1,128 |
| **Sustaining capital(1)** |  |  |  |  |  |  | 21,019 |
| **General and administrative** |  |  |  |  |  |  | 7,400 |
| **Exploration** |  |  |  |  |  |  | 2,233 |
| **Reclamation** |  |  |  |  |  |  | 4,170 |
| **Project/pre-development costs** |  |  |  |  |  |  | 2,098 |
| **All-in sustaining costs** |  |  |  |  |  |  | **$138,513** |
| **Silver equivalent ounces sold** |  |  |  |  |  |  | 5,868,193 |
| **Kensington and Wharf silver equivalent ounces sold** |  |  |  |  |  |  | 3,417,840 |
| **Consolidated silver equivalent ounces sold** |  |  |  |  |  |  | 9,286,033 |
| **All-in sustaining costs per silver equivalent ounce** |  |  |  |  |  |  | **$14.92** |
| **Consolidated silver equivalent ounces sold (average spot)** |  |  |  |  |  |  | 10,622,163 |
| **All-in sustaining costs per average spot silver equivalent ounce** |  |  |  |  |  |  | **$13.04** |

(1) Excludes development capital for Jualin, Guadalupe, Independencia and Rochester crushing capacity expansion.

### Six Months Ended June 30, 2017

*In thousands except per ounce amounts*

| Silver Palmarejo Rochester | San Bartolomé | Endeavor | Total | Gold Kensington | Wharf | Total | Total |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| **Costs applicable to sales, including amortization (U.S. GAAP)** $111,476 $61,354 | $45,237 | $986 | $219,053 | $73,956 | $37,748 | $111,704 | $330,757 |
| **Amortization** 34,581 10,754 | 3,623 | 281 | 49,239 | 17,525 | 5,660 | 23,185 | 72,424 |
| **Costs applicable to sales** $76,895 $50,600 | $41,614 | $705 | $169,814 | $56,431 | $32,088 | $88,519 | $258,333 |
| **Silver equivalent ounces sold** 7,422,969 3,878,209 | 2,546,044 | 98,999 | 13,946,221 |  |  |  | 20,384,641 |
| **Gold equivalent ounces sold** |  |  |  | 61,175 | 46,132 | 107,307 |  |
| **Costs applicable to sales per ounce** $10.36 $13.05 | $16.34 | $7.12 | **$12.18** | $922 | $696 | **$825** | $12.67 |
| **Costs applicable to sales per average spot ounce** $9.40 $12.17 |  |  | **$11.33** |  |  |  | $11.41 |
| **Costs applicable to sales** |  |  |  |  |  |  | $258,333 |
| **Treatment and refining costs** |  |  |  |  |  |  | 2,904 |
| **Sustaining capital(1)** |  |  |  |  |  |  | 29,169 |
| **General and administrative** |  |  |  |  |  |  | 17,175 |
| **Exploration** |  |  |  |  |  |  | 13,065 |
| **Reclamation** |  |  |  |  |  |  | 7,915 |
| **Project/pre-development costs** |  |  |  |  |  |  | 3,566 |
| **All-in sustaining costs** |  |  |  |  |  |  | **$332,127** |
| **Silver equivalent ounces sold** |  |  |  |  |  |  | 13,946,221 |
| **Kensington and Wharf silver equivalent ounces sold** |  |  |  |  |  |  | 6,438,420 |
| **Consolidated silver equivalent ounces sold** |  |  |  |  |  |  | 20,384,641 |
| **All-in sustaining costs per silver equivalent ounce** |  |  |  |  |  |  | **$16.29** |
| **Consolidated silver equivalent ounces sold (average spot)** |  |  |  |  |  |  | 22,639,877 |
| **All-in sustaining costs per average spot silver equivalent ounce** |  |  |  |  |  |  | **$14.67** |

(1) Excludes development capital for Jualin, Guadalupe South Portal and Rochester expansion permitting.

### Six Months Ended June 30, 2016

*In thousands except per ounce amounts*

| Silver Palmarejo Rochester | San Bartolomé | Endeavor | Total | Gold Kensington | Wharf | Total | Total |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| **Costs applicable to sales, including amortization (U.S. GAAP)** $65,957 $54,956 | $39,749 | $1,320 | $161,982 | $65,186 | $38,982 | $104,168 | $266,150 |
| **Amortization** 22,054 10,750 | 3,607 | 383 | 36,794 | 18,157 | 9,179 | 27,336 | 64,130 |
| **Costs applicable to sales** $43,903 $44,206 | $36,142 | $937 | $125,188 | $47,029 | $29,803 | $76,832 | $202,020 |
| **Silver equivalent ounces sold** 4,204,732 3,691,261 | 2,802,846 | 158,106 | 10,856,945 |  |  |  | 17,561,045 |
| **Gold equivalent ounces sold** |  |  |  | 61,827 | 49,908 | 111,735 |  |
| **Costs applicable to sales per ounce** $10.44 $11.98 | $12.89 | $5.93 | **$11.53** | $761 | $597 | **$688** | $11.50 |
| **Costs applicable to sales per average spot ounce** $9.23 $10.75 |  |  | **$10.58** |  |  |  | $9.88 |
| **Costs applicable to sales** |  |  |  |  |  |  | $202,020 |
| **Treatment and refining costs** |  |  |  |  |  |  | 2,286 |
| **Sustaining capital(1)** |  |  |  |  |  |  | 37,729 |
| **General and administrative** |  |  |  |  |  |  | 15,676 |
| **Exploration** |  |  |  |  |  |  | 3,963 |
| **Reclamation** |  |  |  |  |  |  | 7,931 |
| **Project/pre-development costs** |  |  |  |  |  |  | 3,655 |
| **All-in sustaining costs** |  |  |  |  |  |  | **$273,260** |
| **Silver equivalent ounces sold** |  |  |  |  |  |  | 10,856,945 |
| **Kensington and Wharf silver equivalent ounces sold** |  |  |  |  |  |  | 6,704,100 |
| **Consolidated silver equivalent ounces sold** |  |  |  |  |  |  | 17,561,045 |
| **All-in sustaining costs per silver equivalent ounce** |  |  |  |  |  |  | **$15.56** |
| **Consolidated silver equivalent ounces sold (average spot)** |  |  |  |  |  |  | 20,438,295 |
| **All-in sustaining costs per average spot silver equivalent ounce** |  |  |  |  |  |  | **$13.37** |

(1) Excludes development capital for Jualin, Guadalupe, Independencia and Rochester crushing capacity expansion.

### Reconciliation of All-in Sustaining Costs per Silver Equivalent Ounce for Revised 2017 Guidance

*In thousands except per ounce amounts*

| Silver Palmarejo Rochester San Bartolomé | Endeavor | Total Silver | Gold Kensington | Wharf | Total Gold | Total Combined |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| **Costs applicable to sales, including amortization (U.S. GAAP)** $228,500 $113,550 $92,300 | $1,038 | $435,388 | $136,600 | $82,200 | $218,800 | $654,188 |
| **Amortization** 76,500 22,550 8,300 | 281 | 107,631 | 29,100 | 13,200 | 42,300 | 149,931 |
| **Costs applicable to sales** $152,000 $91,000 $84,000 | $757 | $327,757 | $107,500 | $69,000 | $176,500 | $504,257 |
| **Silver equivalent ounces sold** 14,900,000 7,800,000 5,200,000 | 105,000 | 28,005,000 |  |  |  | 41,505,000 |
| **Gold equivalent ounces sold** |  |  | 130,000 | 95,000 | 225,000 |  |
| **Costs applicable to sales per ounce guidance** **$10.00 - $10.50** **$11.50 - $12.00** **$15.75 - $16.25** |  |  | **$800 - $850** | **$700 - $750** |  |  |
| **Costs applicable to sales** |  |  |  |  |  | $504,257 |
| **Treatment and refining costs** |  |  |  |  |  | 4,500 |
| **Sustaining capital, including capital lease payments** |  |  |  |  |  | 77,000 |
| **General and administrative** |  |  |  |  |  | 30,000 |
| **Exploration** |  |  |  |  |  | 30,000 |
| **Reclamation** |  |  |  |  |  | 15,000 |
| **Project/pre-development costs** |  |  |  |  |  | 6,000 |
| **All-in sustaining costs** |  |  |  |  |  | $666,757 |
| **Silver equivalent ounces sold** |  |  |  |  |  | 28,005,000 |
| **Kensington and Wharf silver equivalent ounces sold** |  |  |  |  |  | 13,500,000 |
| **Consolidated silver equivalent ounces sold** |  |  |  |  |  | 41,505,000 |
| **All-in sustaining costs per silver equivalent ounce guidance** |  |  |  |  |  | **$15.75 - $16.25** |

### Reconciliation of All-in Sustaining Costs per Silver Equivalent Ounce for Previous 2017 Guidance

*In thousands except per ounce amounts*

| Silver Palmarejo Rochester San Bartolomé | Endeavor | Total Silver | Gold Kensington | Wharf | Total Gold | Total Combined |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| **Costs applicable to sales, including amortization (U.S. GAAP)** $211,000 $108,380 $102,000 | $3,750 | $425,130 | $130,500 | $83,800 | $214,300 | $639,430 |
| **Amortization** 69,200 19,860 18,500 | — | 107,560 | 29,100 | 11,500 | 40,600 | 148,160 |
| **Costs applicable to sales** $141,800 $88,520 $83,500 | $3,750 | $317,570 | $101,400 | $72,300 | $173,700 | $491,270 |
| **Silver equivalent ounces sold** 14,000,000 7,680,000 5,900,000 | 380,000 | 27,960,000 |  |  |  | 40,800,000 |
| **Gold equivalent ounces sold** |  |  | 124,000 | 90,000 | 214,000 |  |
| **Costs applicable to sales per ounce guidance** **$10.00 - $10.50** **$11.50 - $12.00** **$14.00 - $14.50** |  |  | **$800 - $850** | **$775 - $825** |  |  |
| **Costs applicable to sales** |  |  |  |  |  | $491,270 |
| **Treatment and refining costs** |  |  |  |  |  | 4,300 |
| **Sustaining capital, including capital lease payments** |  |  |  |  |  | 82,000 |
| **General and administrative** |  |  |  |  |  | 30,000 |
| **Exploration** |  |  |  |  |  | 30,000 |
| **Reclamation** |  |  |  |  |  | 14,000 |
| **Project/pre-development costs** |  |  |  |  |  | 5,700 |
| **All-in sustaining costs** |  |  |  |  |  | $657,270 |
| **Silver equivalent ounces sold** |  |  |  |  |  | 27,960,000 |
| **Kensington and Wharf silver equivalent ounces sold** |  |  |  |  |  | 12,840,000 |
| **Consolidated silver equivalent ounces sold** |  |  |  |  |  | 40,800,000 |
| **All-in sustaining costs per silver equivalent ounce guidance** |  |  |  |  |  | **$15.75 - $16.25** |

45

### Cautionary Statement Concerning Forward-Looking Statements

This report contains numerous forward-looking statements within the meaning of Section 21E of the Securities Exchange Act of 1934, as amended (the “Exchange Act”) relating to the Company’s gold and silver mining business, including statements regarding strategies to produce long-term cash flow, provide opportunities for growth through continued exploration, generate superior and sustainable returns for stockholders, maximize net cash flow, reduce operating and non-operating costs, demonstrate consistent capital discipline, efficiently manage working capital, and statements regarding tax positions, anticipated production, costs and expenses, the anticipated closing of the sale of the Endeavor silver stream, drought conditions in Bolivia, efforts to mitigate risks associated with gold and silver price and foreign currency fluctuations and the adequacy of liquidity and capital resources. Such forward-looking statements are identified by the use of words such as “believes,” “intends,” “expects,” “hopes,” “may,” “should,” “plan,” “projected,” “contemplates,” “anticipates” or similar words. Actual results could differ materially from those projected in the forward-looking statements. The factors that could cause actual results to differ materially from those projected in the forward-looking statements include (i) the risk factors set forth in the “Risk Factors” section of the 2016 10-K and in this Report, and the risks and uncertainties discussed in this MD&A, (ii) the risk that the sale of the Endeavor silver stream does not close on a timely basis or at all, (iii) the risks and hazards inherent in the mining business (including risks inherent in developing large-scale mining projects, environmental hazards, industrial accidents, weather or geologically related conditions), (iv) changes in the market prices of gold and silver and a sustained lower price environment, including any resulting impact on cash flows, (v) the uncertainties inherent in the Company’s production, exploratory and developmental activities, including risks relating to permitting and regulatory delays, ground conditions and grade variability, (vi) any future labor disputes or work stoppages (involving the Company and its subsidiaries or third parties), (vii) the uncertainties inherent in the estimation of gold and silver reserves and mineralized material, (viii) changes that could result from the Company’s future acquisition of new mining properties or businesses, (ix) the loss of access to any third-party smelter to which the Company markets silver and gold, (x) the effects of environmental and other governmental regulations, (xi) the risks inherent in the ownership or operation of or investment in mining properties or businesses in foreign countries, (xii) the political risks and uncertainties associated with operations in Bolivia; and (xiii) the Company’s ability to raise additional financing necessary to conduct its business, make payments or refinance its debt. Readers are cautioned not to put undue reliance on forward-looking statements. The Company disclaims any intent or obligation to update publicly these forward-looking statements, whether as a result of new information, future events or otherwise.

## Market risk

As filed, 3,867 characters.

The Company is exposed to various market risks as a part of its operations and engages in risk management strategies to mitigate these risks. The Company continually evaluates the potential benefits of engaging in these strategies based on current market conditions. The Company does not actively engage in the practice of trading derivative instruments for profit. Additional information about the Company’s derivative financial instruments may be found in Note 11 -- Derivative Financial Instruments in the notes to the condensed consolidated financial statements. This discussion of the Company’s market risk assessments contains “forward looking statements”. For additional information regarding forward-looking statements and risks and uncertainties that could impact the Company, please refer to Item 2 of this Report - Cautionary Statement Concerning Forward-Looking Statements. Actual results and actions could differ materially from those discussed below.

### Gold and Silver Price

Gold and silver prices may fluctuate widely due to numerous factors, such as U.S. dollar strength or weakness, demand, investor sentiment, inflation or deflation, and global mine production. The Company’s profitability and cash flow may be significantly impacted by changes in the market price of gold and silver.

### Gold and Silver Hedging

To mitigate the risks associated with gold and silver price fluctuations, the Company may enter into option contracts to hedge future production. The Company had no outstanding gold and silver option contracts at June 30, 2017.

### Provisional Silver and Gold Sales

The Company enters into sales contracts with third-party smelters and refiners which, in some cases, provide for a provisional payment based upon preliminary assays and quoted metal prices. The provisionally priced sales contracts contain an embedded derivative that is required to be separated from the host contract. Depending on the difference between the price at the time of sale and the final settlement price, embedded derivatives are recorded as either a derivative asset or liability. The embedded derivatives do not qualify for hedge accounting and, as a result, are marked to the market gold and silver price at the end of each period from the provisional sale date to the date of final settlement. The mark-to-market gains and losses are recorded in earnings. Changes in silver and gold prices resulted in provisional pricing mark-to-market losses of $0.8 million and gains of $0.6 million in the three and six months ended June 30, 2016, respectively, compared to gains of $0.6 million and $1.2 million in the three and six months ended June 30, 2016, respectively.

At June 30, 2017, the Company had outstanding provisionally priced sales of 0.1 million ounces of silver and 32,602 ounces of gold at prices of $16.85 and $1,263, respectively. A 10% change in realized silver price would cause revenue to vary by $0.2 million and a 10% change in realized gold price would cause revenue to vary by $4.1 million.

### Foreign Currency

The Company operates, or has mineral interests, in several foreign countries including Australia, Bolivia, Chile, Mexico, Argentina, Ecuador, and New Zealand, which exposes it to foreign currency exchange rate risks. Foreign currency exchange rates are influenced by world market factors beyond the Company’s control such as supply and demand for U.S. and foreign currencies and related monetary and fiscal policies. Fluctuations in local currency exchange rates in relation to the U.S. dollar may significantly impact profitability and cash flow.

### Foreign Exchange Hedging

To manage foreign currency risk, the Company may enter into foreign exchange forward and/or option contracts when the Company believes such contracts would be beneficial. The Company had no outstanding foreign exchange contracts at June 30, 2017.

## Controls and procedures

As filed, 2,011 characters.

(a) ***Disclosure Controls and Procedures***

As of the end of the period covered by this quarterly report, the Company carried out an evaluation, under the supervision and with the participation of the Company’s management, including its Chief Executive Officer and Chief Financial Officer, of the effectiveness of the design and operation of the Company’s disclosure controls and procedures (as such term is defined in Rules 13a-15(e) and 15d-15(e) of the Securities Exchange Act of 1934, as amended (the “Exchange Act”), and management necessarily applied its judgment in assessing the costs and benefits of such controls and procedures, which by their nature, can provide only reasonable assurance regarding management’s control objectives. The design of any system of controls is based in part upon certain assumptions about the likelihood of future events. Based upon the foregoing, the Company’s Chief Executive Officer and Chief Financial Officer concluded that the Company’s disclosure controls and procedures were effective and operating to provide reasonable assurance that information required to be disclosed by it in the reports it files or submits under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in the SEC’s rules and forms, and to provide reasonable assurance that such information is accumulated and communicated to the Company’s management, including its Chief Executive Officer and Chief Financial Officer, as appropriate to allow timely decisions regarding required disclosure.

(b) ***Management’s Report on Internal Control Over Financial Reporting***

Based on an evaluation by the Company’s Chief Executive Officer and Chief Financial Officer, such officers concluded

that there was no change in the Company’s internal control over financial reporting during the three months ended June 30, 2017 that has materially affected, or is reasonably likely to materially affect, the Company’s internal control over financial reporting.

## Risk factors

As filed, 6,739 characters.

Item 1A - Risk Factors of the 2016 10-K sets forth information relating to important risks and uncertainties that could materially adversely affect the Company's business, financial condition or operating results. Those risk factors have been supplemented and updated in this Form 10-Q. Additional risks and uncertainties that the Company does not presently know or that it currently deems immaterial also may impair our business operations.

***The Company’s estimates of future production, costs, and financial results are imprecise, depend upon subjective factors, may not be realized in actual production and such estimates speak only as of their respective dates.***

The Company has in the past, and may in the future, provide estimates and projections of its future production, costs and financial results. Any such information is forward-looking. Neither the Company’s independent registered public accounting firm nor any other independent expert or outside party compiles or examines these forward-looking statements and, accordingly, no such person expresses any opinion or any other form of assurance with respect thereto. These forward-looking statements are prepared by the Company’s management and technical personnel and are qualified by, and subject to, the assumptions and the other information contained or referred to in the filing, release or presentation in which they are made, including assumptions about the availability, accessibility, sufficiency and quality of mineralized material, the Company’s costs of production, the market prices of silver and gold, the Company’s ability to sustain and increase production levels, the sufficiency of its infrastructure, the performance of its personnel and equipment, its ability to maintain and obtain mining interests and permits, the state of government and community relations, and its compliance with existing and future laws and regulations. The Company sometimes states possible outcomes as high and low ranges which are intended to provide a sensitivity analysis as variables are changed but are not intended to represent that actual results could not fall outside of the suggested ranges. Actual results and experience may differ materially from these assumptions. Any such production, cost, or financial results estimates speak only as of the date on which they are made, and the Company disclaims any intent or obligation to update such estimates, whether as a result of new information, future events or otherwise. Accordingly, these forward-looking statements should be considered in the context in which they are made and undue reliance should not be placed on them.

***The Company’s future operating performance may not generate cash flows sufficient to meet debt payment obligations.***

As of June 30, 2017, the Company had approximately $284.8 million of outstanding indebtedness. The Company’s ability to make scheduled debt payments on outstanding indebtedness will depend on future results of operations and cash flows. The

Company’s results of operations and cash flows, in part, are subject to economic factors beyond its control, including the market prices of silver and gold. The Company may not be able to generate enough cash flow to meet obligations and commitments under outstanding debt instruments. If the Company cannot generate sufficient cash flow from operations to service debt, it may need to further refinance debt, dispose of assets or issue equity to obtain the necessary funds.

If the Company’s cash flows and capital resources are insufficient to fund its debt services obligations, the Company could face substantial liquidity problems and could be forced to reduce or delay investments and capital expenditures or to dispose of material assets or operations, seek additional debt or equity capital or restructure or refinance its indebtedness. The Company cannot predict whether it would be able to refinance debt, issue equity or dispose of assets to raise funds on a timely basis or on satisfactory terms. In a rising interest rate environment, the costs of borrowing additional funds or refinancing outstanding indebtedness would also be expected to increase. The agreements governing the Company’s outstanding indebtedness restrict the Company’s ability to dispose of assets and use the proceeds from those dispositions and may also restrict its ability to raise debt or equity capital to be used to repay other indebtedness when it becomes due. The Company may not be able to consummate those dispositions or to obtain proceeds in an amount sufficient to meet any debt service obligations then due. If the Company raises additional funds by issuing equity securities or securities convertible into equity securities, holders of its common stock could experience significant dilution of their ownership interest, and these securities could have rights senior to those of the holders of common stock.

### The terms of the Company’s debt impose restrictions on its operations.

The agreements governing the Company’s outstanding indebtedness include a number of significant negative covenants. These covenants, among other things:

- limit the Company’s ability to obtain additional financing, repurchase outstanding equity or issue debt securities;
- require a portion of the Company’s cash flows to be dedicated to debt service payments instead of other purposes, thereby reducing the amount of cash flows available for working capital, capital expenditures, acquisitions and other general corporate purposes;
- limit the Company’s ability to sell, transfer or otherwise dispose of assets, enter into transactions with affiliates, enter into agreements restricting our subsidiaries’ ability to pay dividends, consolidate, amalgamate, merger or sell all or substantially all of the Company’s assets;
- increase our vulnerability to general adverse economic and industry conditions;
- limit the Company’s flexibility in planning for and reacting to changes in the industry in which we compete; and
- place the Company at a disadvantage compared to other, less leveraged competitors.

A breach of any of these covenants could result in an event of default under the applicable agreement governing the Company’s outstanding indebtedness that, if not cured or waived, could cause all amounts outstanding with respect to the debt to be due and payable immediately. Acceleration of any debt could result in cross-defaults under the Company’s other debt instruments. The Company’s assets and cash flow may be insufficient to repay borrowings fully under all of its outstanding debt instruments if any of its debt instruments are accelerated upon an event of default, which could force the Company into bankruptcy or liquidation.

Filed Jul 27, 2017.
Source: SEC EDGAR, the filing index for accession 0000215466-17-000099. Last ingested by Listed: Nov 14, 2026, 12:15 ET. No prices; not investment advice.