# Alliant Energy Corp: Form 10-Q for the period ended Jun 30, 2014

- Company: [Alliant Energy Corp](/companies/lnt.md) (CIK 352541)
- Form: 10-Q
- Filed: 2014-08-07
- Accepted by EDGAR: Aug 7, 2014, 12:19 ET
- Period: 2014-06-30
- Accession: 0000352541-14-000019
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/352541/000035254114000019/lnt630201410-q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/352541/000035254114000019/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2014-06-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2014-04-01 to 2014-06-30 | $750.3m | us-gaap:Revenues |
| Revenue | 6 months, 2014-01-01 to 2014-06-30 | $1.70bn | us-gaap:Revenues |
| Operating income | 3 months, 2014-04-01 to 2014-06-30 | $103.3m | us-gaap:OperatingIncomeLoss |
| Operating income | 6 months, 2014-01-01 to 2014-06-30 | $257.5m | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2014-04-01 to 2014-06-30 | $45.1m | us-gaap:InterestExpense |
| Interest expense | 6 months, 2014-01-01 to 2014-06-30 | $90.3m | us-gaap:InterestExpense |
| Income tax | 3 months, 2014-04-01 to 2014-06-30 | $13.2m | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 6 months, 2014-01-01 to 2014-06-30 | $33.8m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2014-04-01 to 2014-06-30 | $64.3m | us-gaap:NetIncomeLoss |
| Net income | 6 months, 2014-01-01 to 2014-06-30 | $174.9m | us-gaap:NetIncomeLoss |
| Diluted EPS | 6 months, 2014-01-01 to 2014-06-30 | $1.53 | us-gaap:EarningsPerShareBasicAndDiluted |
| Operating cash flow | 6 months, 2014-01-01 to 2014-06-30 | $448.2m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Dividends paid | 6 months, 2014-01-01 to 2014-06-30 | $112.9m | us-gaap:PaymentsOfDividendsCommonStock |
| Cash and equivalents | at 2014-06-30 | $16.2m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2014-06-30 | $1.01bn | us-gaap:AssetsCurrent |
| Total assets | at 2014-06-30 | $11.39bn | us-gaap:Assets |
| Current liabilities | at 2014-06-30 | $1.73bn | us-gaap:LiabilitiesCurrent |
| Long-term debt | at 2014-06-30 | $2.83bn | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2014-06-30 | $509.0m | us-gaap:LongTermDebtCurrent |
| Short-term borrowings | at 2014-06-30 | $307.9m | us-gaap:CommercialPaper |
| Shareholders' equity | at 2014-06-30 | $3.34bn | us-gaap:StockholdersEquity |
| Shares outstanding | at 2014-06-30 | 110,935,680 shares | dei:EntityCommonStockSharesOutstanding |

## Management's discussion and analysis

As filed, 99,662 characters.

This MDA includes information relating to Alliant Energy, IPL and WPL, as well as Resources and Corporate Services. Where appropriate, information relating to a specific entity has been segregated and labeled as such. The following discussion and analysis should be read in conjunction with the Financial Statements and the Notes included in this report as well as the financial statements, notes and MDA included in the 2013 Form 10-K. Unless otherwise noted, all “per share” references in MDA refer to earnings per diluted share.

### CONTENTS OF MDA

MDA consists of the following information:

- Executive Summary
- Strategic Overview
- Rate Matters
- Environmental Matters
- Legislative Matters
- Alliant Energy’s Results of Operations
- IPL’s Results of Operations
- WPL’s Results of Operations
- Liquidity and Capital Resources
- Other Matters
- Market Risk Sensitive Instruments and Positions
- New Accounting Pronouncements
- Critical Accounting Policies and Estimates
- Other Future Considerations

### EXECUTIVE SUMMARY

### Description of Business

**General -** Alliant Energy is an investor-owned public utility holding company whose primary subsidiaries are IPL, WPL, Resources and Corporate Services. IPL is a public utility engaged principally in the generation and distribution of electricity and the distribution and transportation of natural gas in selective markets in Iowa and southern Minnesota. WPL is a public utility engaged principally in the generation and distribution of electricity and the distribution and transportation of natural gas in selective markets in southern and central Wisconsin. At June 30, 2014, WPL and Resources, through their ownership interests in WPL Transco, in aggregate held an approximate 16% interest in ATC, a transmission-only utility operating primarily in the Midwest. Resources is the parent company for Alliant Energy’s non-regulated businesses. Corporate Services provides administrative services to Alliant Energy and its subsidiaries. An illustration of Alliant Energy’s primary businesses is shown below.

|  |  |
| --- | --- |
| Alliant Energy |  |
| Utilities and Corporate Services | Non-regulated and Parent |
| - Electric and gas services in IA (IPL) | - Transportation (Resources) |
| - Electric and gas services in WI (WPL) | - Non-regulated Generation (Resources) |
| - 16% interest in ATC (primarily WPL) | - Parent Company |
| - Electric and gas services in MN (IPL) (a) |  |
| - Corporate Services |  |

(a) In September 2013, IPL signed definitive agreements to sell its Minnesota electric and natural gas distribution assets. Pending receipt of remaining regulatory approvals, the transactions are expected to be concluded by December 31, 2014.

**Financial Results -** Alliant Energy’s net income and EPS attributable to Alliant Energy common shareowners for the second quarter were as follows (dollars in millions, except per share amounts):

| Continuing operations: | 2014 Income (Loss) | EPS | 2013 Income (Loss) | EPS |
| --- | ---: | ---: | ---: | ---: |
| Utilities and Corporate Services | **$55.1** | **$0.50** | $58.4 | $0.52 |
| Non-regulated and parent | **7.0** | **0.06** | 7.5 | 0.07 |
| Income from continuing operations | **62.1** | **0.56** | 65.9 | 0.59 |
| Loss from discontinued operations | **(0.3)** | **—** | (0.6) | — |
| Net income | **$61.8** | **$0.56** | $65.3 | $0.59 |

The table above includes utilities and Corporate Services, and non-regulated and parent EPS from continuing operations, which are non-GAAP financial measures. Alliant Energy believes utilities and Corporate Services, and non-regulated and parent EPS from continuing operations, are useful to investors because they facilitate an understanding of segment performance and trends and provide additional information about Alliant Energy’s operations on a basis consistent with the measures that management uses to manage its operations and evaluate its performance. Alliant Energy’s management also uses utilities and Corporate Services EPS from continuing operations to determine performance-based compensation.

**Utilities and Corporate Services -** Lower EPS from continuing operations in the second quarter of 2014 compared to the second quarter of 2013 was primarily due to:

- $0.11 per share of retail electric customer billing credits at IPL related to the settlement agreement proposed for its Iowa retail electric rate case (2013 Test Year) in the second quarter of 2014;
- $0.03 per share of higher energy efficiency cost recovery amortizations at WPL in the second quarter of 2014 compared to the second quarter of 2013;
- $0.03 per share of higher generation operation and maintenance expenses at IPL in the second quarter of 2014 compared to the second quarter of 2013;
- $0.02 per share of higher interest expense at IPL in the second quarter of 2014 compared to the second quarter of 2013 due to IPL’s $250 million 4.7% senior debentures issued in October 2013;
- $0.02 per share of higher electric transmission service expenses, net of recoveries in the second quarter of 2014 compared to the second quarter of 2013;
- $0.02 per share of higher depreciation expense at IPL and WPL in the second quarter of 2014 compared to the second quarter of 2013; and
- $0.02 per share of earnings deferral recorded in the second quarter of 2014 for projected excess return on equity for 2014 at WPL.

These items were partially offset by:

- $0.19 per share of purchased electric capacity expense related to the previous DAEC PPA recorded in the second quarter of 2013; and
- $0.09 per share of purchased electric capacity expense related to the Kewaunee PPA recorded in the second quarter of 2013.

Refer to “Alliant Energy’s Results of Operations,” “IPL’s Results of Operations” and “WPL’s Results of Operations” for additional details regarding the various factors impacting earnings during the second quarters of 2014 and 2013.

### Strategic Overview Highlights

The strategic plan focuses on the core business of delivering regulated electric and natural gas service in Iowa and Wisconsin, and is built upon three key elements: competitive costs, safe and reliable service, and balanced generation. Key strategic plan developments since the filing of the 2013 Form 10-K include the following. Refer to “Strategic Overview” for a more detailed discussion of strategic plan developments.

- April 2014 - IPL and MidAmerican each filed an updated EPB with the IUB. IPL’s EPB includes the scrubber and baghouse currently under construction at Ottumwa Unit 1 and the scrubber currently under construction at Lansing Unit 4. MidAmerican’s EPB includes the scrubber and baghouse placed in service in May 2014 at George Neal Unit 3. Alliant Energy and IPL currently expect the IUB to issue its decisions on IPL’s and MidAmerican’s EPBs by the end of the second quarter of 2015.
- April 2014 - The scrubber and baghouse at WPL’s Columbia Unit 2 were placed in service. In addition, the scrubber and baghouse at WPL’s Columbia Unit 1 were placed in service in July 2014.
- May 2014 - The scrubber and baghouse at IPL’s George Neal Unit 3 were placed in service.
- June 2014 - After receiving the final necessary regulatory approvals and permits in the second quarter of 2014, IPL began constructing Marshalltown, an approximate 650 MW natural gas-fired combined-cycle EGU. IPL currently expects to place Marshalltown in service in the second quarter of 2017.
- June 2014 - WPL issued an RFP seeking supply of up to 600 MW of capacity and energy to meet the needs of its customers beginning in 2019. WPL plans to complete a feasibility study of various resource options and file the necessary regulatory applications for approval of the selected resource option with the PSCW in early 2015.
- July 2014 - WPL filed a CA application with the PSCW to install an SCR system at Columbia Unit 2 to reduce NOx emissions at the EGU. WPL’s portion of the capital expenditures for the SCR system, excluding AFUDC, is currently estimated to be between $60 million and $80 million.

### Rate Matters Highlights

Federal regulation of wholesale electric rates is administered by FERC and state regulation of retail utility rates is administered by the IUB, PSCW and MPUC. Key regulatory developments since the filing of the 2013 Form 10-K include the following. Refer to “Rate Matters” for a more detailed discussion of regulatory developments.

- March 2014 - After reaching a unanimous agreement with parties to the DAEC PPA proceeding, IPL filed with the IUB a settlement agreement and joint motion for approval of the settlement agreement to extend IPL’s Iowa retail electric base rate freeze through 2016 and provide retail electric customer billing credits of $70 million in 2014 (beginning May 2014), decreasing to $25 million in 2015 and further decreasing to $10 million in 2016. During the second quarter of 2014, IPL recorded $20 million of such retail electric customer billing credits. The settlement agreement included the continuation of the energy adjustment clause, continuation of the transmission cost rider, continuation of electric tax benefit rider credits through at least 2016, the ability for IPL to seek rate relief if a significant event occurs, and the ability for parties to the DAEC PPA proceeding to request show cause action if IPL’s Iowa retail electric return on common equity exceeds 11%. IPL currently expects a decision from the IUB regarding the settlement agreement in the third quarter of 2014.
- June 2014 - WPL filed a request with the PSCW to increase annual rates for WPL’s retail electric customers by $55 million, or approximately 5%, in 2015. The increase includes $41 million of anticipated increases in retail electric fuel-related costs in 2015 and $14 million to recover a portion of the under-collection of fuel-related costs projected for 2014. Any rate changes granted from this request are expected to be effective on January 1, 2015.
- July 2014 - WPL received an order from the PSCW authorizing WPL to implement its retail base rate filing as requested. The retail base rate filing request was based on a forward-looking test period that includes 2015 and 2016. The filing requested authority to maintain customer base rates for WPL’s retail electric customers at their current levels through the end of 2016. The filing also requested approval for WPL to implement a $5 million decrease in annual base rates for WPL’s retail gas customers effective January 1, 2015 followed by a freeze of such gas base rates through the end of 2016. The request included a return of and a return on costs for the construction of emission controls projects at Columbia Units 1 and 2 and Edgewater Unit 5, generation performance and reliability improvements at Columbia Units 1 and 2, and other ongoing capital expenditures. The additional revenue requirements for the recovery of the costs for these capital projects are being offset by the impact of changes in amortizations of regulatory liabilities associated with energy efficiency cost recoveries.

### Environmental Matters Highlights

Environmental matters are regulated by various federal, state and local authorities. Key environmental developments since the filing of the 2013 Form 10-K include the following. Refer to “Environmental Matters” for a more detailed discussion of environmental developments.

- April 2014 - The U.S. Supreme Court reversed the D.C. Circuit Court’s 2012 decision that vacated CSAPR. However, CSAPR was not immediately implemented due to a stay of the rule in place from the D.C. Circuit Court and outstanding legal and regulatory uncertainties. In June 2014, the EPA requested that the D.C. Circuit Court lift the stay of CSAPR and allow the first phase of the rule to begin in 2015 and the second phase of the rule to begin in 2017. Alliant Energy, IPL and WPL are uncertain when the D.C. Circuit Court will respond to the EPA’s request. In the meantime, CAIR remains effective.
- May 2014 - The EPA issued the final Section 316(b) of the Federal Clean Water Act rule to regulate cooling water intake structures and minimize adverse environmental impacts to fish and other aquatic life. The schedule for compliance with this rule has not yet been finalized; however, compliance is currently expected to be required within eight years of the effective date of the final rule.
- June 2014 - The EPA issued proposed standards to reduce CO2 emissions from existing fossil-fueled EGUs. The EPA is proposing a two-part goal structure: an “interim goal” that each state meets on average over the period from 2020 through 2029, and a “final goal” based on a three-year rolling average that each state meets beginning in 2030. State plans that provide details of how these guidelines are to be met would be required by June 30, 2016. The EPA’s proposal allows for a one-year extension to submit state-only plans and a two-year extension if a state elects to join a regional multi-state program. The EPA is currently expected to issue final standards by June 1, 2015.

### Liquidity and Capital Resources Highlights

Based on current liquidity positions and capital structures, the additional capital required to implement the strategic plan and to meet long-term contractual obligations is expected to be secured. Key financing developments since the filing of the 2013 Form 10-K include the following. Refer to “Liquidity and Capital Resources” for a more detailed discussion of financing developments.

- March 2014 - IPL extended through March 2016 the purchase commitment from the third party to which it sells its receivables.
- March 2014 - Standard & Poor’s Rating Services affirmed the current credit ratings and outlooks for Alliant Energy, IPL and WPL.
- June 2014 - At June 30, 2014, Alliant Energy and its subsidiaries had $692 million of available capacity under the revolving credit facilities, $140 million of available capacity at IPL under its sales of accounts receivable program and $16 million of cash and cash equivalents.

### Other Matters Highlights

Other key developments since the filing of the 2013 Form 10-K that could impact future financial condition or results of operations include the following. Refer to “Other Matters” for a more detailed discussion of potential impacts to future financial condition and results of operations.

- March 2014 - Jo-Carroll provided notice of termination of its wholesale power supply agreement with IPL effective April 1, 2018. Sales to Jo-Carroll represented 2% of IPL’s total electric sales in 2013.
- April 2014 - FERC accepted an SSR agreement and related cost allocation filed by MISO related to another utility’s EGU (Presque Isle) located in an area for which ATC provides transmission services. Based on FERC’s April 2014 decision, WPL’s share of the annual revenue requirement was originally expected to be approximately $10 million, effective February 1, 2014. In July 2014, FERC issued an order directing MISO to make a compliance filing to revise the cost allocation pursuant to a PSCW complaint effective April 3, 2014. As a result, WPL is currently unable to estimate its allocated SSR costs; however, WPL expects its costs to decrease from the prior estimate as a result of the July 2014 FERC order.
- June 2014 - FERC issued an order that reduced the ISO-NE transmission owners’ authorized return on equity. Alliant Energy, IPL and WPL are currently unable to determine what, if any, impact this June 2014 FERC order and a new methodology FERC used in determining the return on equity may have on a November 2013 complaint filed by a group of MISO industrial customer organizations related to ITC’s and ATC’s current authorized return on equity.
- July 2014 - The Iowa Supreme Court issued a ruling affirming the Polk County, Iowa District Court’s March 2013 decision, which found Eagle Point is not a public utility and could sell directly to the City of Dubuque the power generated by a 175 kilowatt solar unit installed on the City of Dubuque’s property. Alliant Energy and IPL are currently unable to determine the impact this ruling may have on IPL’s future electric sales.

### STRATEGIC OVERVIEW

A strategic overview summary is included in the 2013 Form 10-K and has not changed materially from the items reported in the 2013 Form 10-K, except as described below.

### Generation Plans -

### Natural Gas-Fired Generation -

IPL’s Construction of Marshalltown - After receiving the final necessary regulatory approvals and permits in the second quarter of 2014, IPL began constructing Marshalltown, an approximate 650 MW natural gas-fired combined-cycle EGU. IPL currently expects to place Marshalltown in service in the second quarter of 2017.

WPL’s Potential Generation Investment - In June 2014, WPL issued an RFP seeking supply of up to 600 MW of capacity and energy to address its customers’ needs beginning in 2019. The RFP solicits ownership and/or long-term PPA proposals for new or existing resources, or access to a portion of the output of a system of resources, to supply all or a portion of its long-term electric capacity and energy needs. The generation resource is needed to replace older and less efficient units, provide customers with stable power supply and support economic growth. WPL plans to complete the feasibility study of resource options and file the necessary regulatory applications for approval of the selected resource option with the PSCW in early 2015. Alliant Energy’s and WPL’s current capital expenditure estimates for this potential generation investment are based on WPL potentially constructing a 300 MW natural gas-fired combined-cycle EGU and are subject to change after the resource option is selected.

In May 2014, the PSCW authorized WPL to defer the retail portion of incremental pre-certification and pre-construction costs associated with its potential generation investment beginning March 2014. WPL currently estimates deferral of such costs will be approximately $11 million in aggregate by December 31, 2015.

### Environmental Compliance Plans -

**IPL’s Emission Controls Projects -** In April 2014, IPL and MidAmerican (which operates George Neal Unit 3) each filed an updated EPB with the IUB. IPL’s EPB includes the scrubber and baghouse currently under construction at Ottumwa Unit 1 and the scrubber currently under construction at Lansing Unit 4. MidAmerican’s EPB includes the scrubber and baghouse placed in service in May 2014 at George Neal Unit 3. Alliant Energy and IPL currently expect the IUB to issue its decisions on IPL’s and MidAmerican’s EPBs by the end of the second quarter of 2015.

George Neal Unit 3 - Refer to Note 3 for discussion of the scrubber and baghouse at George Neal Unit 3, which were placed in service in May 2014 and expect to reduce SO2 and mercury emissions at the EGU by approximately 90%.

### WPL’s Emission Controls Projects -

Columbia Units 1 and 2 - Refer to Note 3 for discussion of the scrubbers and baghouses at Columbia Units 1 and 2. The emission controls projects at Columbia Units 1 and 2 were placed in service in July 2014 and April 2014, respectively, and expect to reduce SO2 and mercury emissions at the EGUs by approximately 90%.

Columbia Unit 2 - In July 2014, WPL filed a CA application with the PSCW to install an SCR system at Columbia Unit 2 to reduce NOx emissions at the EGU. The SCR is expected to support compliance obligations for current and anticipated air quality requirements, including CAIR or some alternative to this rule that may be implemented, and requirements under the Consent Decree WPL entered into with the EPA and the Sierra Club in April 2013. WPL’s portion of the capital expenditures for the SCR system, excluding AFUDC, is currently estimated to be between $60 million and $80 million.

### RATE MATTERS

A rate matters summary is included in the 2013 Form 10-K and has not changed materially from the items reported in the 2013 Form 10-K, except as described below.

### Retail Base Rate Filings -

**WPL’s Wisconsin Retail Electric and Gas Rate Case (2015/2016 Test Period) -** In July 2014, WPL received an order from the PSCW authorizing WPL to implement its retail base rate filing as requested. The retail base rate filing request was based on a forward-looking test period that included 2015 and 2016. The filing requested authority to maintain customer base rates for WPL’s retail electric customers at their current levels through the end of 2016. The filing also requested approval for WPL to implement a $5 million decrease in annual base rates for WPL’s retail gas customers effective January 1, 2015 followed by a freeze of such gas base rates through the end of 2016. The request included a return of and a return on costs for the construction of emission controls projects at Columbia Units 1 and 2 and Edgewater Unit 5, generation performance and reliability improvements at Columbia Units 1 and 2, and other ongoing capital expenditures. The additional revenue requirements for the recovery of the costs for these capital projects are being offset by the impact of changes in amortizations of regulatory liabilities associated with energy efficiency cost recoveries.

WPL’s retail base rate filing included escrow treatment of major transmission charges, continuation of an 8.2% AFUDC recovery rate, and continuation of a 10.4% return on common equity and the following related provisions: (1) WPL may request a change in retail base rates during the test period if its annual regulatory return on common equity falls below 8.5%; and (2) WPL must defer a portion of the amount of earnings if its annual regulatory return on common equity exceeds 10.65% during the test period. WPL must defer 50% of its excess earnings between 10.65% and 11.40%, and 100% of any excess earnings above 11.40%. In addition, the filing requested WPL maintain its ability to request deferrals based on current practices. The filing also included the following key assumptions (Common Equity (CE); Long-term Debt (LD); Short-term Debt (SD); Weighted-average Cost of Capital (WACC)):

| Utility Type | Test Period | Regulatory Capital Structure CE | LD | SD | After-tax WACC | Average Retail Rate Base (in millions) (a) |
| --- | --- | ---: | ---: | ---: | ---: | ---: |
| Electric | 2015 | 50.5% | 48.9% | 0.6% | 7.9% | $2,329 |
| Electric | 2016 | 51.0% | 46.2% | 2.8% | 7.8% | 2,450 |
| Gas | 2015 | 50.5% | 48.9% | 0.6% | 7.9% | 201 |
| Gas | 2016 | 51.0% | 46.2% | 2.8% | 7.8% | 204 |

(a) Average rate base is calculated using a 13-month average.

In addition, WPL will be prohibited from paying annual common stock dividends to its parent company in excess of $127 million in 2015 and $135 million in 2016 if WPL’s actual 13-month average common equity ratio (calculated on a financial basis consistent with WPL’s rate cases) falls below 51.79% for 2015 and 52.25% for 2016.

The fuel-related cost component of WPL’s retail electric rates for 2015 and 2016 will be addressed in separate filings.

**IPL’s Iowa Retail Electric Rate Case (2013 Test Year) -** In March 2014, after reaching a unanimous agreement with parties to the DAEC PPA proceeding, IPL filed with the IUB a settlement agreement and joint motion for approval of the settlement agreement to extend IPL’s Iowa retail electric base rate freeze through 2016 and provide retail electric customer billing credits of $70 million in 2014 (beginning May 2014), decreasing to $25 million in 2015 and further decreasing to $10 million in 2016. During the three and six months ended June 30, 2014, IPL recorded $20 million of such retail electric customer billing credits. The settlement agreement included the continuation of the energy adjustment clause, continuation of the transmission cost rider, continuation of electric tax benefit rider credits through at least 2016, the ability for IPL to seek rate relief if a significant event occurs, and the ability for parties to the DAEC PPA proceeding to request show cause action if IPL’s Iowa retail electric return on common equity exceeds 11%. IPL currently expects a decision from the IUB regarding the settlement agreement in the third quarter of 2014.

Items considered in settlement discussions included costs for emission controls at Ottumwa Unit 1, George Neal Units 3 and 4, Burlington Unit 1 and Prairie Creek Units 3 and 4, generation performance and reliability improvements at Ottumwa Unit 1, and other ongoing capital expenditures; the elimination of purchased electric capacity payments from the previous DAEC PPA that ended in February 2014; and costs of the new DAEC PPA, which are being recovered from Iowa retail electric customers through the energy adjustment clause beginning in February 2014. IPL assumes no change to its current authorized return on common equity and common equity component of the regulatory capital structure. At December 31,

2014, IPL’s projected Iowa retail electric rate base is expected to be as follows: $233 million for Emery Generation Station; $277 million for Whispering Willow - East; and $2,553 million for the remaining rate base items.

### WPL’s Retail Fuel-related Rate Filings -

**2015 Test Year** - Refer to Note 2 for discussion of WPL’s June 2014 request filed with the PSCW to increase annual rates for WPL’s retail electric customers for anticipated increases in retail electric fuel-related costs in 2015 and the recovery of a portion of the projected under-collection of fuel-related costs for 2014.

**2014 Test Year -** Refer to Note 2 for discussion of amounts recorded by Alliant Energy and WPL on their balance sheets as of June 30, 2014 for fuel-related costs incurred by WPL during the six months ended June 30, 2014 that are expected to fall outside the approved bandwidth for 2014.

### ENVIRONMENTAL MATTERS

An environmental matters summary is included in the 2013 Form 10-K and has not changed materially from the items reported in the 2013 Form 10-K, except as described below.

### Air Quality -

**CAIR/CSAPR -** CAIR includes a regional cap-and-trade system covering the eastern U.S., where compliance with SO2 and NOx emissions limits may be achieved by purchasing emission allowances and/or reducing emissions through changes in operations or the additions of emission controls. In 2011, the EPA issued CSAPR as a replacement rule for CAIR. CSAPR also included requirements to reduce SO2 and NOx emissions. In 2012, the D.C. Circuit Court vacated CSAPR and in 2013, the EPA appealed this decision to the U.S. Supreme Court. In April 2014, the U.S. Supreme Court ruled in the EPA’s favor and reversed the D.C. Circuit Court’s decision regarding CSAPR. However, CSAPR was not immediately implemented due to a stay of the rule in place from the D.C. Circuit Court and outstanding legal and regulatory uncertainties. In June 2014, the EPA requested the D.C. Circuit Court lift the stay of CSAPR and allow the first phase of the rule to begin in 2015 and the second phase of the rule to begin in 2017. Alliant Energy, IPL and WPL are uncertain when the D.C. Circuit Court will respond to the EPA’s request. Alliant Energy, IPL and WPL will continue to monitor legal and regulatory developments related to CSAPR. In the meantime, CAIR remains effective. Alliant Energy, IPL and WPL currently believe that CAIR will be replaced in the future, either by a modified CSAPR or another rule that addresses the interstate transport of air pollutants. Alliant Energy, IPL and WPL currently expect to meet the final compliance requirements based on planned and completed emission controls projects for various EGUs.

### GHG Emissions -

GHG Tailoring Rule - In 2010, the EPA issued the GHG Tailoring Rule, which establishes a GHG emissions threshold for major sources under the PSD construction permit and Title V operation permit. In June 2014, the Supreme Court ruled that the EPA may not treat GHG emissions as “air pollutants” for determining whether a major source is required to obtain a PSD or Title V permit, but held that the EPA can continue requiring Best Available Control Technology for GHG emissions from sources otherwise subject to review under the PSD program. Further rulemaking may also be required to update state regulations implementing the GHG Tailoring Rule to make the Supreme Court’s decision effective.

Clean Power Plan - Existing Fossil-fueled EGUs - In June 2014, the EPA issued proposed standards under Section 111(d) of the CAA to reduce CO2 emissions from existing fossil-fueled EGUs. The EPA’s proposal is based on broad measures that can reduce CO2 emissions from existing fossil-fueled EGUs, including making existing coal-fired EGUs more efficient, increasing dispatch of existing combined-cycle natural gas-fired EGUs, maintaining or expanding zero- or low-CO2 energy resources such as renewables and nuclear, and reducing customer demand for electricity through energy efficiency programs. The state-specific goals are based on an emissions rate basis measured in pounds per net MWh. The EPA is proposing a two-part goal structure: an “interim goal” that each state meets on average over the period from 2020 through 2029, and a “final goal” based on a three-year rolling average that each state meets beginning in 2030.

State plans will determine the specific compliance requirements applicable to Alliant Energy, IPL and WPL. Each state has flexibility in determining how to achieve the goals, which can include the broad measures included by the EPA as well as any other enforceable measures that the state can demonstrate will reduce CO2 emissions from existing fossil-fueled EGUs. The EPA also proposed to give states the option to convert the rate-based goal to a mass-based goal measured in tons. States can develop a state-only plan or collaborate in developing regional multi-state plans. State plans that provide details of how these guidelines are to be met would be required by June 30, 2016. If a state needs additional time and provides proper notification and explanation, the EPA’s proposal allows for a one-year extension to submit state-only plans and a two-year extension if a state elects to join a regional multi-state program. The EPA is currently expected to issue final standards by June 1, 2015.

Depending on the measures included in state plans, the expected dates for the retirement and fuel switching of certain coal-fired EGUs may be impacted by the new requirements. The implications of these new requirements remain highly uncertain, and as a result Alliant Energy, IPL and WPL are currently unable to predict with certainty the final outcome of these standards, but expect that expenditures to comply with any regulations to reduce GHG emissions could be significant.

### Water Quality -

**Section 316(b) of the Federal Clean Water Act -** In May 2014, the EPA issued a final rule to regulate cooling water intake structures and minimize adverse environmental impacts to fish and other aquatic life. This rule applies to existing and new cooling water intake structures at certain steam generating and manufacturing facilities. The schedule for compliance with this rule has not yet been finalized; however, compliance is currently expected to be required within eight years of the effective date of the final rule. Alliant Energy, IPL and WPL have completed a preliminary assessment of the final Section 316(b) rule and do not believe there will be a significant impact on their financial condition and results of operations.

### LEGISLATIVE MATTERS

A legislative matters summary is included in the 2013 Form 10-K and has not changed materially from the items reported in the 2013 Form 10-K.

### ALLIANT ENERGY’S RESULTS OF OPERATIONS

**Overview - Second Quarter Results** - Refer to “Executive Summary” for an overview of Alliant Energy’s second quarter 2014 and 2013 earnings and the various components of its business. Additional details of Alliant Energy’s earnings for the three months ended June 30, 2014 and 2013 are discussed below.

**Utility Electric Margins -** Electric margins are defined as electric operating revenues less electric production fuel, energy purchases and purchased electric capacity expenses. Management believes that electric margins provide a more meaningful basis for evaluating utility operations than electric operating revenues since electric production fuel, energy purchases and purchased electric capacity expenses are generally passed through to customers, and therefore, result in changes to electric operating revenues that are comparable to changes in electric production fuel, energy purchases and purchased electric capacity expenses.

**Second Quarter 2014 vs. Second Quarter 2013 Summary -** Electric margins and MWh sales for Alliant Energy for the three months ended June 30 were as follows:

|  | Revenues and Costs (dollars in millions) 2014 | 2013 | Change | MWhs Sold (MWhs in thousands) 2014 | 2013 | Change |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Residential | **$221.5** | $218.8 | 1% | **1,661** | 1,698 | (2%) |
| Commercial | **156.0** | 148.4 | 5% | **1,523** | 1,503 | 1% |
| Industrial | **200.3** | 180.4 | 11% | **2,958** | 2,887 | 2% |
| Retail subtotal | **577.8** | 547.6 | 6% | **6,142** | 6,088 | 1% |
| Sales for resale: |  |  |  |  |  |  |
| Wholesale | **51.5** | 45.2 | 14% | **852** | 833 | 2% |
| Bulk power and other | **2.3** | 5.1 | (55%) | **106** | 285 | (63%) |
| Other | **12.3** | 14.2 | (13%) | **36** | 43 | (16%) |
| Total revenues/sales | **643.9** | 612.1 | 5% | **7,136** | 7,249 | (2%) |
| Electric production fuel expense | **100.7** | 86.2 | 17% |  |  |  |
| Energy purchases expense | **113.4** | 71.8 | 58% |  |  |  |
| Purchased electric capacity expense | **—** | 52.0 | (100%) |  |  |  |
| Electric margins (a) | **$429.8** | $402.1 | 7% |  |  |  |

(a) Includes $19 million and $20 million of credits on IPL’s Iowa retail electric customers’ bills for the second quarters of 2014 and 2013, respectively, resulting from the electric tax benefit rider. The electric tax benefit rider results in reductions in electric revenues that are offset by reductions in income tax expense for the years ended December 31, 2014 and 2013.

**Six Months Ended June 30, 2014 vs. Six Months Ended June 30, 2013 Summary** - Electric margins and MWh sales for Alliant Energy for the six months ended June 30 were as follows:

|  | Revenues and Costs (dollars in millions) 2014 | 2013 | Change | MWhs Sold (MWhs in thousands) 2014 | 2013 | Change |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Residential | **$489.7** | $466.9 | 5% | **3,885** | 3,747 | 4% |
| Commercial | **317.0** | 295.6 | 7% | **3,177** | 3,048 | 4% |
| Industrial | **385.6** | 356.2 | 8% | **5,782** | 5,584 | 4% |
| Retail subtotal | **1,192.3** | 1,118.7 | 7% | **12,844** | 12,379 | 4% |
| Sales for resale: |  |  |  |  |  |  |
| Wholesale | **105.0** | 92.3 | 14% | **1,788** | 1,717 | 4% |
| Bulk power and other | **(1.8)** | 8.3 | (122%) | **196** | 436 | (55%) |
| Other | **24.2** | 26.0 | (7%) | **78** | 83 | (6%) |
| Total revenues/sales | **1,319.7** | 1,245.3 | 6% | **14,906** | 14,615 | 2% |
| Electric production fuel expense | **229.8** | 200.1 | 15% |  |  |  |
| Energy purchases expense | **198.2** | 137.0 | 45% |  |  |  |
| Purchased electric capacity expense | **24.8** | 109.0 | (77%) |  |  |  |
| Electric margins (a) | **$866.9** | $799.2 | 8% |  |  |  |

(a) Includes $42 million and $38 million of credits on Iowa retail electric customers’ bills for the six months ended June 30, 2014 and 2013, respectively, resulting from IPL’s electric tax benefit rider. The electric tax benefit rider results in reductions in electric revenues that are offset by reductions in income tax expense for the years ended December 31, 2014 and 2013.

**Variances -** Variances between periods in electric margins for the three and six months ended June 30, 2014 compared to the same periods in 2013 were as follows (in millions):

|  | Three Months Alliant Energy | IPL | WPL | Six Months Alliant Energy | IPL | WPL |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Lower purchased electric capacity expenses at IPL related to the previous DAEC PPA, which ended in February 2014 | $36 | $36 | $— | $52 | $52 | $— |
| Purchased electric capacity expenses at WPL during 2013 related to the Kewaunee PPA, which ended in December 2013 | 15 | — | 15 | 31 | — | 31 |
| Estimated increase from changes in sales caused by weather conditions | 2 | — | 2 | 12 | 6 | 6 |
| Higher revenues at IPL related to changes in recovery amounts for transmission costs through the transmission rider (a) | 3 | 3 | — | 11 | 11 | — |
| Retail electric customer billing credits at IPL (b) | (20) | (20) | — | (20) | (20) | — |
| Changes in electric fuel-related costs, net of recoveries at WPL | (1) | — | (1) | (8) | — | (8) |
| Higher (lower) revenues at IPL due to changes in credits on Iowa retail electric customers’ bills resulting from the electric tax benefit rider | 1 | 1 | — | (4) | (4) | — |
| Changes in revenue requirement adjustment related to certain tax benefits from tax accounting method changes at IPL (c) | (2) | (2) | — | (4) | (4) | — |
| Earnings deferral for excess return on equity at WPL | (3) | — | (3) | (3) | — | (3) |
| Other (d) | (3) | (5) | 2 | 1 | (6) | 6 |
|  | $28 | $13 | $15 | $68 | $35 | $32 |

48

(a) Higher transmission rider revenues were offset by higher electric transmission service expenses.

(b) Billing credits related to the settlement agreement proposed for IPL’s Iowa retail electric rate case (2013 Test Year) began in May 2014 and are expected to be $70 million for 2014. Refer to “Rate Matters - IPL’s Iowa Retail Electric Rate Case (2013 Test Year)” for further discussion.

(c) Refer to Note 2 for further discussion of IPL’s revenue requirement adjustment.

(d) Largely related to the impacts of changes in weather-normalized retail sales volumes at IPL and WPL. Refer to “Sales Trends” below for additional details.

**Weather Conditions -** Temperatures during the first quarter of 2014 were 20-25% colder than normal, as measured by HDDs in Alliant Energy’s service territories. These extremely cold temperatures caused a large increase in IPL’s and WPL’s electric and gas sales for the six months ended June 30, 2014 due to high demand by customers for heating. HDD and CDD in Alliant Energy’s service territories for the three and six months ended June 30 were as follows:

| HDD (a): | Three Months Actual 2014 | 2013 | Normal | Six Months Actual 2014 | 2013 | Normal |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Cedar Rapids, Iowa (IPL) | **711** | 775 | 703 | **4,903** | 4,296 | 4,128 |
| Madison, Wisconsin (WPL) | **797** | 897 | 833 | **5,072** | 4,642 | 4,331 |
| CDD (a): |  |  |  |  |  |  |
| Cedar Rapids, Iowa (IPL) | **263** | 246 | 215 | **263** | 246 | 217 |
| Madison, Wisconsin (WPL) | **233** | 190 | 178 | **233** | 190 | 180 |

(a) HDD and CDD are calculated using a simple average of the high and low temperatures each day compared to a 65 degree base. Normal degree days are calculated using a rolling 20-year average of historical HDD and CDD.

Estimated increases to electric margins from the impacts of weather for the three and six months ended June 30 were as follows (in millions):

|  | Three Months 2014 | 2013 | Change | Six Months 2014 | 2013 | Change |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| IPL | **$2** | $2 | $— | **$9** | $3 | $6 |
| WPL | **3** | 1 | 2 | **9** | 3 | 6 |
| Total Alliant Energy | **$5** | $3 | $2 | **$18** | $6 | $12 |

**Electric Production Fuel and Energy Purchases (Fuel-related) Expense** - Fossil fuels, such as coal and natural gas, are burned to produce electricity at EGUs. The cost of fossil fuels used during each period is included in electric production fuel expense, which increased $15 million and $30 million for the three- and six-month periods, respectively. The increase for the three-month period was primarily due to changes in the under-/over-collection of fuel-related costs at IPL, partially offset by deferred fuel-related costs incurred during the three months ended June 30, 2014 that are expected to fall outside the approved bandwidth for 2014 at WPL and lower MISO dispatch of IPL’s generating facilities for the three months ended June 30, 2014 compared to the same period in 2013. The increase for the six-month period was primarily due to the unseasonably cold weather conditions in Alliant Energy’s service territory in the first quarter of 2014, which resulted in higher commodity prices and increased customer demand in the first quarter of 2014. This contributed to higher MISO dispatch of IPL’s and WPL’s generating facilities in the first quarter of 2014. The increase for the six-month period was also impacted by changes in the under-/over-collection of fuel-related costs at IPL, partially offset by deferred fuel-related costs incurred during the six months ended June 30, 2014 that are expected to fall outside the approved bandwidth for 2014 at WPL.

Electricity is also purchased to meet customer demand and these costs are charged to energy purchases expense, which increased $42 million and $61 million for the three- and six-month periods, respectively. The increases for the three- and six-month periods were primarily due to increased prices for electricity, partially resulting from IPL’s new DAEC PPA. The six-month increase was also due to extremely cold temperatures in the first quarter of 2014 contributing to higher prices for electricity purchased by IPL and WPL from wholesale energy markets (primarily MISO) for the six-month period.

Due to IPL’s rate recovery mechanisms for fuel-related costs, changes in fuel-related costs resulted in comparable changes in electric revenues and, therefore, did not have a significant impact on electric margins. WPL’s rate recovery mechanism for wholesale fuel-related costs also provides for adjustments to its wholesale electric rates for changes in commodity costs, thereby mitigating impacts of changes to commodity costs on electric margins.

WPL’s retail fuel-related costs incurred during the three and six months ended June 30, 2014 were higher than the forecasted fuel-related costs used to set retail rates during such periods. WPL estimates the higher than forecasted retail fuel-related costs decreased electric margins by approximately $0 and $6 million during the three and six months ended June 30, 2014, respectively. WPL’s retail fuel-related costs incurred during the three and six months ended June 30, 2013 were lower than the forecasted fuel-related costs used to set retail rates during such periods. WPL estimates the lower than forecasted retail fuel-related costs increased electric margins by approximately $1 million and $2 million during the three and six months ended June 30, 2013, respectively. Refer to Note 2 for discussion of fuel-related costs incurred by WPL during the six months ended June 30, 2014 that are expected to fall outside the approved bandwidth for 2014.

**Purchased Electric Capacity Expense -** Alliant Energy enters into PPAs to help meet the electricity demand of IPL’s and WPL’s customers. Certain of these PPAs included minimum payments for IPL’s and WPL’s rights to electric generating capacity. The previous DAEC PPA expired in February 2014 and the Kewaunee PPA expired in December 2013. The new DAEC PPA effective February 2014 does not contain minimum payments for electric generating capacity. Details of purchased electric capacity expense included in the utility electric margins tables above for the three and six months ended June 30 were as follows (in millions):

|  | Three Months 2014 | 2013 | Change | Six Months 2014 | 2013 | Change |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| DAEC PPA (IPL) | **$—** | $36 | ($36) | **$25** | $77 | ($52) |
| Kewaunee PPA (WPL) | **—** | 15 | ($15) | **—** | 31 | ($31) |
| Other | **—** | 1 | ($1) | **—** | 1 | ($1) |
|  | **$—** | $52 | ($52) | **$25** | $109 | ($84) |

**Sales Trends** - Retail sales volumes increased 1% and 4% for the three and six months ended June 30, 2014 compared to the same periods in 2013, respectively. These increases were primarily due to an increase in commercial and industrial sales due to production expansion at several customers and the impact of weather conditions on residential and commercial sales, including the impact of the unseasonably cold weather conditions in the first quarter of 2014. These increases were partially offset by a decline in IPL weather-normalized residential sales.

Wholesale sales volumes increased 2% and 4% for the three and six months ended June 30, 2014 compared to the same periods in 2013, respectively. The three- and six-month increases were primarily due to increases in sales to one of IPL’s full-requirement wholesale customers due to production expansion and the impacts of weather conditions on demand, including the impacts of the unseasonably cold weather conditions during the first quarter of 2014.

Bulk power and other revenue changes were largely due to changes in sales in the wholesale energy markets operated by MISO and PJM. These changes are impacted by several factors, including the availability and dispatch of Alliant Energy’s EGUs and electricity demand within these wholesale energy markets. Changes in bulk power and other sales revenues were largely offset by changes in fuel-related costs, and therefore, did not have a significant impact on electric margins.

WPL participates in bid/offer-based wholesale energy and ancillary services markets operated by MISO. The MISO day-ahead and real-time transactions are grouped together, resulting in a net supply of MWhs to or net purchase of MWhs from MISO for each hour of each day. The net supply to MISO is recorded in bulk power and other revenue and the net purchase from MISO is recorded in energy purchases expense. For the six months ended June 30, 2014, WPL’s transactions recorded as revenues in the hourly MISO wholesale energy market resulted in a net cost due to the price of gross purchases exceeding the price of gross sales, resulting in a net expense for WPL’s bulk power and other revenues for the six months ended June 30, 2014.

Refer to “Rate Matters” for discussion of a retail electric base rate case order received by WPL in July 2014 and a retail electric rate settlement agreement filed by IPL in March 2014. Refer to Note 2 for discussion of WPL’s retail fuel-related rate increase effective January 1, 2014, WPL’s retail fuel-related rate increase request filed in June 2014 and IPL’s electric tax benefit rider. Refer to “Other Future Considerations” for discussion of colder than normal weather conditions in July 2014, a notification of termination of a wholesale power supply agreement provided to IPL by one of its wholesale customers and a July 2014 Iowa Supreme Court ruling related to a renewable power developer seeking to distribute energy in IPL’s service territory.

**Utility Gas Margins -** Gas margins are defined as gas operating revenues less cost of gas sold. Management believes that gas margins provide a more meaningful basis for evaluating utility operations than gas operating revenues since cost of gas sold is generally passed through to customers, and therefore, results in changes to gas operating revenues that are comparable to changes in cost of gas sold.

**Second Quarter 2014 vs. Second Quarter 2013 Summary -** Gas margins and Dth sales for Alliant Energy for the three months ended June 30 were as follows:

|  | Revenues and Costs (dollars in millions) 2014 | 2013 | Change | Dths Sold (Dths in thousands) 2014 | 2013 | Change |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Residential | **$41.0** | $41.1 | —% | **4,060** | 4,377 | (7%) |
| Commercial | **24.6** | 21.9 | 12% | **3,137** | 3,185 | (2%) |
| Industrial | **4.4** | 3.5 | 26% | **634** | 640 | (1%) |
| Retail subtotal | **70.0** | 66.5 | 5% | **7,831** | 8,202 | (5%) |
| Transportation/other | **6.9** | 6.9 | —% | **13,583** | 13,035 | 4% |
| Total revenues/sales | **76.9** | 73.4 | 5% | **21,414** | 21,237 | 1% |
| Cost of gas sold | **45.0** | 38.9 | 16% |  |  |  |
| Gas margins (a) | **$31.9** | $34.5 | (8%) |  |  |  |

(a) Includes $3 million and $3 million of credits on IPL’s Iowa retail gas customers’ bills for the second quarters of 2014 and 2013, respectively, resulting from the gas tax benefit rider. The gas tax benefit rider results in reductions in gas revenues that are offset by reductions in income tax expense for the years ended December 31, 2014 and 2013.

**Six Months Ended June 30, 2014 vs. Six Months Ended June 30, 2013 -** Gas margins and Dth sales for Alliant Energy for the six months ended June 30 were as follows:

|  | Revenues and Costs (dollars in millions) 2014 | 2013 | Change | Dths Sold (Dths in thousands) 2014 | 2013 | Change |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Residential | **$185.0** | $158.9 | 16% | **20,895** | 18,263 | 14% |
| Commercial | **102.8** | 86.5 | 19% | **13,712** | 12,152 | 13% |
| Industrial | **11.6** | 9.7 | 20% | **1,757** | 1,636 | 7% |
| Retail subtotal | **299.4** | 255.1 | 17% | **36,364** | 32,051 | 13% |
| Transportation/other | **18.2** | 15.6 | 17% | **31,611** | 29,494 | 7% |
| Total revenues/sales | **317.6** | 270.7 | 17% | **67,975** | 61,545 | 10% |
| Cost of gas sold | **206.9** | 166.9 | 24% |  |  |  |
| Gas margins (a) | **$110.7** | $103.8 | 7% |  |  |  |

(a) Includes $6 million and $5 million of credits on IPL’s Iowa retail gas customers’ bills for the six months ended June 30, 2014 and 2013, respectively, resulting from the gas tax benefit rider. The gas tax benefit rider results in reductions in gas revenues that are offset by reductions in income tax expense for the years ended December 31, 2014 and 2013.

Gas margins decreased $3 million and increased $7 million for the three- and six-month periods, respectively, primarily due to changes in sales caused by weather conditions in Alliant Energy’s service territories during such periods.

Estimated increases (decreases) to gas margins from the impacts of weather for the three and six months ended June 30 were as follows (in millions):

|  | Three Months 2014 | 2013 | Change | Six Months 2014 | 2013 | Change |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| IPL | **$—** | $1 | ($1) | **$4** | $1 | $3 |
| WPL | **(1)** | — | (1) | **4** | 1 | 3 |
| Total Alliant Energy | **($1)** | $1 | ($2) | **$8** | $2 | $6 |

Refer to “Utility Electric Margins” for HDD data details. Refer to “Rate Matters” for discussion of a retail gas base rate case order received by WPL in July 2014. Refer to Note 2 for discussion of IPL’s gas tax benefit rider.

**Utility Other Revenues -** Other revenues for the utilities decreased $2 million and increased $3 million for the three- and six-month periods, respectively. The three-month decrease was primarily due to lower coal sales at WPL. The six-month increase was primarily due to $5 million of higher margins from IPL’s sharing mechanism related to optimizing gas capacity contracts, partially offset by lower coal sales at WPL. Approximately 50% of all margins earned from IPL’s sharing mechanism flow through the purchased gas adjustment clause to reduce retail gas customer bills in Iowa. The remaining margins are retained by IPL and recorded in utility other revenues. Due to the extreme cold temperatures causing price fluctuations in the first quarter of 2014, margins were much greater than normal for the six months ended June 30, 2014. Changes in utility other revenues related to coal sales at WPL were largely offset by changes in utility other operation and maintenance expenses related to coal sales at WPL.

**Electric Transmission Service Expense -** Variances between periods in electric transmission service expense for the three and six months ended June 30, 2014 compared to the same periods in 2013 were as follows (in millions):

|  | Three Months Alliant Energy | IPL | WPL | Six Months Alliant Energy | IPL | WPL |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Higher electric transmission service costs billed from ITC, ATC and MISO (a) | $9 | $7 | $2 | $24 | $21 | $3 |
| Changes in the under-/over-collection of electric transmission service expenses through the transmission cost rider at IPL (b) | (4) | (4) | — | (8) | (8) | — |
| Other | 1 | 1 | — | — | — | — |
|  | $6 | $4 | $2 | $16 | $13 | $3 |

(a) Primarily due to increased electric transmission service rates.

(b) IPL is currently recovering the Iowa retail portion of its increased electric transmission service costs from its retail electric customers in Iowa through a transmission cost rider approved by the IUB in January 2011 resulting in a comparable increase in electric revenues.

**Utility Other Operation and Maintenance Expenses -** Variances between periods in other operation and maintenance expenses for the utilities for the three and six months ended June 30, 2014 compared to the same periods in 2013 were as follows (in millions):

|  | Three Months Alliant Energy | IPL | WPL | Six Months Alliant Energy | IPL | WPL |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Higher energy efficiency cost recovery amortizations at WPL (a) | $5 | $— | $5 | $10 | $— | $10 |
| Higher generation expenses at IPL (b) | 5 | 5 | — | 6 | 6 | — |
| Lower expenses related to coal sales at WPL (c) | (3) | — | (3) | (5) | — | (5) |
| Other (d) | 7 | 4 | 3 | 13 | 10 | 4 |
|  | $14 | $9 | $5 | $24 | $16 | $9 |

52

(a) The July 2012 PSCW order for WPL’s 2013/2014 test period electric and gas base rate case authorized higher energy efficiency cost recovery amortizations for 2014.

(b) Primarily resulting from the timing of maintenance projects at IPL’s EGUs.

(c) Changes in expenses related to coal sales at WPL were largely offset by changes in coal sales revenue at WPL.

(d) Primarily due to changes in other administrative and general expenses.

**Depreciation and Amortization Expense -** Depreciation and amortization expense increased $3 million and $6 million for the three- and six-month periods, respectively, primarily due to increased property additions, including various emission controls projects at IPL and WPL placed in service in the second half of 2013 and the first half of 2014.

**Interest Expense -** Interest expense increased $3 million and $5 million for the three- and six-month periods, respectively, primarily due to $3 million and $6 million, respectively, of interest expense recorded in 2014 for IPL’s $250 million 4.7% senior debentures issued in October 2013.

**AFUDC -** AFUDC increased $5 million for the six-month period primarily due to increased CWIP balances related to emission controls projects at IPL’s Ottumwa Unit 1.

**Income Taxes** - Refer to Note 9 for details of effective income tax rates for continuing operations, including discussion of the impacts of tax benefit riders, production tax credits and the effect of rate-making on property-related differences.

**Loss from Discontinued Operations, Net of Tax -** Refer to Note 17 for discussion of discontinued operations.

**Preferred Dividend Requirements of Subsidiaries -** Preferred dividend requirements of subsidiaries decreased $8 million for the six-month period, primarily due to IPL and WPL recording charges of $5 million and $1 million in the first quarter of 2013, respectively, related to the redemption of preferred stock. Refer to Note 7 for further discussion of IPL’s and WPL’s preferred stock transactions.

### IPL’S RESULTS OF OPERATIONS

**Overview - Second Quarter Results** - Earnings available for common stock decreased $4 million primarily due to retail electric customer billing credits in the second quarter of 2014, higher operating expenses and interest expense recorded in the second quarter of 2014 for IPL’s $250 million 4.7% senior debentures issued in October 2013. These items were partially offset by purchased electric capacity expense related to the previous DAEC PPA in the second quarter of 2013.

**Electric Margins -** Electric margins are defined as electric operating revenues less electric production fuel, energy purchases and purchased electric capacity expenses. Management believes that electric margins provide a more meaningful basis for evaluating utility operations than electric operating revenues since electric production fuel, energy purchases and purchased electric capacity expenses are generally passed through to customers, and therefore, result in changes to electric operating revenues that are comparable to changes in electric production fuel, energy purchases and purchased electric capacity expenses.

**Second Quarter 2014 vs. Second Quarter 2013 Summary -** Electric margins and MWh sales for IPL for the three months ended June 30 were as follows:

|  | Revenues and Costs (dollars in millions) 2014 | 2013 | Change | MWhs Sold (MWhs in thousands) 2014 | 2013 | Change |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Residential | **$122.8** | $121.7 | 1% | **876** | 922 | (5%) |
| Commercial | **97.3** | 91.3 | 7% | **966** | 958 | 1% |
| Industrial | **116.5** | 101.1 | 15% | **1,794** | 1,772 | 1% |
| Retail subtotal | **336.6** | 314.1 | 7% | **3,636** | 3,652 | —% |
| Sales for resale: |  |  |  |  |  |  |
| Wholesale | **8.7** | 7.1 | 23% | **120** | 104 | 15% |
| Bulk power and other | **0.8** | — | —% | **9** | 63 | (86%) |
| Other | **8.5** | 8.4 | 1% | **19** | 21 | (10%) |
| Total revenues/sales | **354.6** | 329.6 | 8% | **3,784** | 3,840 | (1%) |
| Electric production fuel expense | **47.4** | 27.0 | 76% |  |  |  |
| Energy purchases expense | **75.5** | 47.9 | 58% |  |  |  |
| Purchased electric capacity expense | **—** | 36.2 | (100%) |  |  |  |
| Electric margins (a) | **$231.7** | $218.5 | 6% |  |  |  |

(a) Includes $19 million and $20 million of credits on IPL’s Iowa retail electric customers’ bills for the second quarters of 2014 and 2013, respectively, resulting from the electric tax benefit rider. The electric tax benefit rider results in reductions in electric revenues that are offset by reductions in income tax expense for the years ended December 31, 2014 and 2013.

**Six Months Ended June 30, 2014 vs. Six Months Ended June 30, 2013 Summary** - Electric margins and MWh sales for IPL for the six months ended June 30 were as follows:

|  | Revenues and Costs (dollars in millions) 2014 | 2013 | Change | MWhs Sold (MWhs in thousands) 2014 | 2013 | Change |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Residential | **$273.3** | $262.0 | 4% | **2,110** | 2,058 | 3% |
| Commercial | **197.3** | 183.1 | 8% | **2,012** | 1,945 | 3% |
| Industrial | **224.1** | 204.0 | 10% | **3,504** | 3,425 | 2% |
| Retail subtotal | **694.7** | 649.1 | 7% | **7,626** | 7,428 | 3% |
| Sales for resale: |  |  |  |  |  |  |
| Wholesale | **16.4** | 14.4 | 14% | **241** | 207 | 16% |
| Bulk power and other | **1.0** | 0.5 | 100% | **14** | 90 | (84%) |
| Other | **16.7** | 15.8 | 6% | **41** | 41 | —% |
| Total revenues/sales | **728.8** | 679.8 | 7% | **7,922** | 7,766 | 2% |
| Electric production fuel expense | **113.6** | 81.4 | 40% |  |  |  |
| Energy purchases expense | **124.5** | 90.2 | 38% |  |  |  |
| Purchased electric capacity expense | **24.8** | 77.6 | (68%) |  |  |  |
| Electric margins (a) | **$465.9** | $430.6 | 8% |  |  |  |

(a) Includes $42 million and $38 million of credits on IPL’s Iowa retail electric customers’ bills for the six months ended June 30, 2014 and 2013, respectively, resulting from the electric tax benefit rider. The electric tax benefit rider results in reductions in electric revenues that are offset by reductions in income tax expense for the years ended December 31, 2014 and 2013.

**Variances -** Electric margins increased $13 million and $35 million for the three- and six-month periods, respectively. Refer to “Alliant Energy’s Results of Operations - Utility Electric Margins” for details of the variances in IPL’s electric margins and IPL’s CDD data.

Refer to “Rate Matters” for discussion of a retail electric rate settlement agreement filed in March 2014. Refer to Note 2 for discussion of the electric tax benefit rider. Refer to “Other Future Considerations” for discussion of colder than normal weather conditions in July 2014, a notification of termination of a wholesale power supply agreement provided to IPL by one of its wholesale customers and a July 2014 Iowa Supreme Court ruling related to a renewable power developer seeking to distribute energy in IPL’s service territory.

**Gas Margins -** Gas margins are defined as gas operating revenues less cost of gas sold. Management believes that gas margins provide a more meaningful basis for evaluating utility operations than gas operating revenues since cost of gas sold is generally passed through to customers, and therefore, results in changes to gas operating revenues that are comparable to changes in cost of gas sold.

**Second Quarter 2014 vs. Second Quarter 2013 Summary -** Gas margins and Dth sales for IPL for the three months ended June 30 were as follows:

|  | Revenues and Costs (dollars in millions) 2014 | 2013 | Change | Dths Sold (Dths in thousands) 2014 | 2013 | Change |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Residential | **$22.9** | $22.9 | —% | **2,233** | 2,355 | (5%) |
| Commercial | **13.3** | 11.8 | 13% | **1,607** | 1,659 | (3%) |
| Industrial | **3.3** | 2.8 | 18% | **493** | 502 | (2%) |
| Retail subtotal | **39.5** | 37.5 | 5% | **4,333** | 4,516 | (4%) |
| Transportation/other | **4.2** | 4.5 | (7%) | **7,097** | 7,413 | (4%) |
| Total revenues/sales | **43.7** | 42.0 | 4% | **11,430** | 11,929 | (4%) |
| Cost of gas sold | **25.7** | 21.8 | 18% |  |  |  |
| Gas margins (a) | **$18.0** | $20.2 | (11%) |  |  |  |

(a) Includes $3 million and $3 million of credits on IPL’s Iowa retail gas customers’ bills for the second quarters of 2014 and 2013, respectively, resulting from the gas tax benefit rider. The gas tax benefit rider results in reductions in gas revenues that are offset by reductions in income tax expense for the years ended December 31, 2014 and 2013.

**Six Months Ended June 30, 2014 vs. Six Months Ended June 30, 2013 Summary -** Gas margins and Dth sales for IPL for the six months ended June 30 were as follows:

|  | Revenues and Costs (dollars in millions) 2014 | 2013 | Change | Dths Sold (Dths in thousands) 2014 | 2013 | Change |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Residential | **$104.2** | $91.4 | 14% | **11,751** | 10,324 | 14% |
| Commercial | **55.8** | 48.2 | 16% | **7,337** | 6,618 | 11% |
| Industrial | **7.9** | 6.8 | 16% | **1,226** | 1,160 | 6% |
| Retail subtotal | **167.9** | 146.4 | 15% | **20,314** | 18,102 | 12% |
| Transportation/other | **11.5** | 9.9 | 16% | **15,796** | 15,971 | (1%) |
| Total revenues/sales | **179.4** | 156.3 | 15% | **36,110** | 34,073 | 6% |
| Cost of gas sold | **113.8** | 93.9 | 21% |  |  |  |
| Gas margins (a) | **$65.6** | $62.4 | 5% |  |  |  |

(a) Includes $6 million and $5 million of credits on IPL’s Iowa retail gas customers’ bills for the six months ended June 30, 2014 and 2013, respectively, resulting from the gas tax benefit rider. The gas tax benefit rider results in reductions in gas revenues that are offset by reductions in income tax expense for the years ended December 31, 2014 and 2013.

Gas margins decreased $2 million and increased $3 million for the three- and six-month periods, respectively, largely due to changes in sales caused by weather conditions in IPL’s service territory during such periods. Refer to “Alliant Energy’s Results of Operations - Utility Gas Margins” for details of the impacts of weather conditions on IPL’s gas sales and “Alliant Energy’s Results of Operations - Utility Electric Margins” for details of IPL’s HDD data. Refer to Note 2 for discussion of the gas tax benefit rider.

**Steam and Other Revenues -** Steam and other revenues increased $7 million during the six-month period primarily due to $5 million of higher margins from IPL’s sharing mechanism related to optimizing gas capacity contracts. Approximately 50% of all margins earned from this sharing mechanism flow through the purchased gas adjustment clause to reduce retail gas customer bills in Iowa. The remaining margins are retained by IPL and recorded in steam and other revenues. Due to the extreme cold temperatures causing price fluctuations in the first quarter of 2014, margins were much greater than normal for the six months ended June 30, 2014.

**Electric Transmission Service Expense -** Electric transmission service expense increased $4 million and $13 million for the three- and six-month periods, respectively. Refer to “Alliant Energy’s Results of Operations - Electric Transmission Service Expense” for IPL’s electric transmission service expense variances.

**Other Operation and Maintenance Expenses -** Other operation and maintenance expenses increased $9 million and $16 million for the three- and six-month periods, respectively. Refer to “Alliant Energy’s Results of Operations - Utility Other Operation and Maintenance Expenses” for IPL’s other operation and maintenance expenses variances.

**Interest Expense -** Interest expense increased $3 million and $6 million for the three- and six-month periods, primarily due to $3 million and $6 million of interest expense, respectively, recorded during the six months ended June 30, 2014 compared to the same period in 2013 for IPL’s $250 million 4.7% senior debentures issued in October 2013.

**AFUDC -** AFUDC increased $4 million for the six-month period primarily due to increased CWIP balances related to emission controls projects at Ottumwa Unit 1.

**Income Taxes** - Refer to Note 9 for details of effective income tax rates, including discussion of the impacts of tax benefit riders, production tax credits and the effect of rate-making on property-related differences.

**Preferred Dividend Requirements -** Preferred dividend requirements decreased $6 million for the six-month period, primarily due to IPL recording charges of $5 million in the first quarter of 2013 related to the redemption of preferred stock. Refer to Note 7 for further discussion of IPL’s preferred stock transactions.

### WPL’S RESULTS OF OPERATIONS

**Overview - Second Quarter Results -** WPL’s earnings available for common stock remained unchanged primarily due to purchased electric capacity expense related to the Kewaunee PPA in the second quarter of 2013, substantially offset by higher energy efficiency cost recovery amortizations and other operating expenses.

**Electric Margins -** Electric margins are defined as electric operating revenues less electric production fuel, energy purchases and purchased electric capacity expenses. Management believes that electric margins provide a more meaningful basis for evaluating utility operations than electric operating revenues since electric production fuel, energy purchases and purchased electric capacity expenses are generally passed through to customers, and therefore, result in changes to electric operating revenues that are comparable to changes in electric production fuel, energy purchases and purchased electric capacity expenses.

**Second Quarter 2014 vs. Second Quarter 2013 Summary -** Electric margins and MWh sales for WPL for the three months ended June 30 were as follows:

|  | Revenues and Costs (dollars in millions) 2014 | 2013 | Change | MWhs Sold (MWhs in thousands) 2014 | 2013 | Change |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Residential | **$98.7** | $97.1 | 2% | **785** | 776 | 1% |
| Commercial | **58.7** | 57.1 | 3% | **557** | 545 | 2% |
| Industrial | **83.8** | 79.3 | 6% | **1,164** | 1,115 | 4% |
| Retail subtotal | **241.2** | 233.5 | 3% | **2,506** | 2,436 | 3% |
| Sales for resale: |  |  |  |  |  |  |
| Wholesale | **42.8** | 38.1 | 12% | **732** | 729 | —% |
| Bulk power and other | **1.5** | 5.1 | (71%) | **97** | 222 | (56%) |
| Other | **3.8** | 5.8 | (34%) | **17** | 22 | (23%) |
| Total revenues/sales | **289.3** | 282.5 | 2% | **3,352** | 3,409 | (2%) |
| Electric production fuel expense | **53.3** | 59.2 | (10%) |  |  |  |
| Energy purchases expense | **37.9** | 23.9 | 59% |  |  |  |
| Purchased electric capacity expense | **—** | 15.8 | (100%) |  |  |  |
| Electric margins | **$198.1** | $183.6 | 8% |  |  |  |

56

**Six Months Ended June 30, 2014 vs. Six Months Ended June 30, 2013 Summary** - Electric margins and MWh sales for WPL for the six months ended June 30 were as follows:

|  | Revenues and Costs (dollars in millions) 2014 | 2013 | Change | MWhs Sold (MWhs in thousands) 2014 | 2013 | Change |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Residential | **$216.4** | $204.9 | 6% | **1,775** | 1,689 | 5% |
| Commercial | **119.7** | 112.5 | 6% | **1,165** | 1,103 | 6% |
| Industrial | **161.5** | 152.2 | 6% | **2,278** | 2,159 | 6% |
| Retail subtotal | **497.6** | 469.6 | 6% | **5,218** | 4,951 | 5% |
| Sales for resale: |  |  |  |  |  |  |
| Wholesale | **88.6** | 77.9 | 14% | **1,547** | 1,510 | 2% |
| Bulk power and other | **(2.8)** | 7.8 | (136%) | **182** | 346 | (47%) |
| Other | **7.5** | 10.2 | (26%) | **37** | 42 | (12%) |
| Total revenues/sales | **590.9** | 565.5 | 4% | **6,984** | 6,849 | 2% |
| Electric production fuel expense | **116.2** | 118.7 | (2%) |  |  |  |
| Energy purchases expense | **73.7** | 46.8 | 57% |  |  |  |
| Purchased electric capacity expense | **—** | 31.4 | (100%) |  |  |  |
| Electric margins | **$401.0** | $368.6 | 9% |  |  |  |

**Variances -** Electric margins increased $15 million and $32 million for the three- and six-month periods, respectively. Refer to “Alliant Energy’s Results of Operations - Utility Electric Margins” for details of the variances in WPL’s electric margins and WPL’s CDD data.

Refer to “Rate Matters” for discussion of a retail electric base rate case order received in July 2014. Refer to Note 2 for discussion of a retail fuel-related rate increase effective January 1, 2014 and a retail fuel-related rate increase request filed in June 2014. Refer to “Other Future Considerations” for discussion of colder than normal weather conditions in July 2014.

**Gas Margins -** Gas margins are defined as gas operating revenues less cost of gas sold. Management believes that gas margins provide a more meaningful basis for evaluating utility operations than gas operating revenues since cost of gas sold is generally passed through to customers, and therefore, results in changes to gas operating revenues that are comparable to changes in cost of gas sold.

**Second Quarter 2014 vs. Second Quarter 2013 Summary -** Gas margins and Dth sales for WPL for the three months ended June 30 were as follows:

|  | Revenues and Costs (dollars in millions) 2014 | 2013 | Change | Dths Sold (Dths in thousands) 2014 | 2013 | Change |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Residential | **$18.1** | $18.2 | (1%) | **1,827** | 2,022 | (10%) |
| Commercial | **11.3** | 10.1 | 12% | **1,530** | 1,526 | —% |
| Industrial | **1.1** | 0.7 | 57% | **141** | 138 | 2% |
| Retail subtotal | **30.5** | 29.0 | 5% | **3,498** | 3,686 | (5%) |
| Transportation/other | **2.7** | 2.4 | 13% | **6,486** | 5,622 | 15% |
| Total revenues/sales | **33.2** | 31.4 | 6% | **9,984** | 9,308 | 7% |
| Cost of gas sold | **19.3** | 17.1 | 13% |  |  |  |
| Gas margins | **$13.9** | $14.3 | (3%) |  |  |  |

57

**Six Months Ended June 30, 2014 vs. Six Months Ended June 30, 2013 Summary -** Gas margins and Dth sales for WPL for the six months ended June 30 were as follows:

|  | Revenues and Costs (dollars in millions) 2014 | 2013 | Change | Dths Sold (Dths in thousands) 2014 | 2013 | Change |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Residential | **$80.8** | $67.5 | 20% | **9,144** | 7,939 | 15% |
| Commercial | **47.0** | 38.3 | 23% | **6,375** | 5,534 | 15% |
| Industrial | **3.7** | 2.9 | 28% | **531** | 476 | 12% |
| Retail subtotal | **131.5** | 108.7 | 21% | **16,050** | 13,949 | 15% |
| Transportation/other | **6.7** | 5.7 | 18% | **15,815** | 13,523 | 17% |
| Total revenues/sales | **138.2** | 114.4 | 21% | **31,865** | 27,472 | 16% |
| Cost of gas sold | **93.1** | 73.0 | 28% |  |  |  |
| Gas margins | **$45.1** | $41.4 | 9% |  |  |  |

Gas margins increased $4 million for the six-month period largely due to changes in sales caused by weather conditions in WPL’s service territory and an increase in weather-normalized retail sales volumes. Refer to “Alliant Energy’s Results of Operations - Utility Gas Margins” for details of the impacts of weather conditions on WPL’s gas sales and “Alliant Energy’s Results of Operations - Utility Electric Margins” for WPL’s HDD data. Refer to “Rate Matters” for discussion of a retail gas base rate case order received in July 2014.

**Other Revenues -** Other revenues decreased $4 million for both the three- and six-month periods primarily due to lower coal sales. Changes in other revenues were largely offset by related changes in other operation and maintenance expenses.

**Other Operation and Maintenance Expenses -** Other operation and maintenance expenses increased $5 million and $9 million for the three- and six-month periods, respectively. Refer to “Alliant Energy’s Results of Operations - Utility Other Operation and Maintenance Expenses” for WPL’s other operation and maintenance expenses variances.

**Income Taxes** - Refer to Note 9 for details of effective income tax rates, including discussion of the impacts of production tax credits.

### LIQUIDITY AND CAPITAL RESOURCES

A liquidity and capital resources matters summary is included in the 2013 Form 10-K and has not changed materially from the items reported in the 2013 Form 10-K, except as described below.

**Liquidity Position -** At June 30, 2014, Alliant Energy had $16 million of cash and cash equivalents, $692 million ($150 million at the parent company, $300 million at IPL and $242 million at WPL) of available capacity under the revolving credit facilities and $140 million of available capacity at IPL under its sales of accounts receivable program.

**Capital Structures** - Capital structures at June 30, 2014 were as follows (dollars in millions):

|  | Alliant Energy (Consolidated) |  | IPL |  | WPL |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Common equity | $3,337.4 | 46% | $1,731.5 | 49% | $1,672.4 | 53% |
| Preferred stock | 200.0 | 3% | 200.0 | 6% | — | —% |
| Noncontrolling interest | 1.7 | —% | — | —% | 5.2 | —% |
| Long-term debt (incl. current maturities) | 3,338.9 | 47% | 1,558.7 | 45% | 1,332.3 | 42% |
| Short-term debt | 307.9 | 4% | — | —% | 158.0 | 5% |
|  | $7,185.9 | 100% | $3,490.2 | 100% | $3,167.9 | 100% |

58

**Cash Flows -** Selected information from the cash flows statements was as follows (in millions):

|  | Alliant Energy 2014 | 2013 | IPL 2014 | 2013 | WPL 2014 | 2013 |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Cash and cash equivalents, January 1 | **$9.8** | $21.2 | **$4.4** | $4.5 | **$0.5** | $0.7 |
| Cash flows from (used for): |  |  |  |  |  |  |
| Operating activities | **448.2** | 423.3 | **206.1** | 173.7 | **235.5** | 225.2 |
| Investing activities | **(369.0)** | (322.2) | **(196.4)** | (189.8) | **(151.1)** | (164.3) |
| Financing activities | **(72.8)** | (110.8) | **(8.7)** | 16.7 | **(78.5)** | (59.1) |
| Net increase (decrease) | **6.4** | (9.7) | **1.0** | 0.6 | **5.9** | 1.8 |
| Cash and cash equivalents, June 30 | **$16.2** | $11.5 | **$5.4** | $5.1 | **$6.4** | $2.5 |

### Operating Activities -

Six Months Ended June 30, 2014 vs. Six Months Ended June 30, 2013 - Alliant Energy’s cash flows from operating activities increased $25 million primarily due to $83 million of lower purchased electric capacity payments during the six months ended June 30, 2014 compared to the same period in 2013 related to the previous DAEC PPA and the Kewaunee PPA, the final receipt of $26 million related to Alliant Energy’s tax separation and indemnification agreement with Whiting Petroleum in March 2014 and higher cash flows from changes in production fuel inventory levels at IPL and WPL. These items were partially offset by higher fuel-related costs at WPL during the six months ended June 30, 2014 compared to the same period in 2013, $24 million of lower cash flows from changes in the level of IPL’s accounts receivable sold during the six months ended June 30, 2014 compared to the same period in 2013, $20 million of retail electric customer billing credits at IPL during the six months ended June 30, 2014, and the timing of electric fuel-related, natural gas and transmission cost recoveries at IPL. Refer to Note 4(b) for discussion of the tax separation and indemnification agreement with Whiting Petroleum. Refer to “Rate Matters - IPL’s Iowa Retail Electric Rate Case (2013 Test Year)” for further discussion of IPL’s retail electric customer billing credits.

IPL’s cash flows from operating activities increased $32 million primarily due to $52 million of lower purchased electric capacity payments during the six months ended June 30, 2014 compared to the same period in 2013 related to the previous DAEC PPA and higher cash flows from changes in production fuel inventory levels. These items were partially offset by $24 million of lower cash flows from changes in the level of accounts receivable sold during the six months ended June 30, 2014 compared to the same period in 2013, $20 million of retail electric customer billing credits during the six months ended June 30, 2014, and the timing of electric fuel-related, natural gas and transmission cost recoveries.

WPL’s cash flows from operating activities increased $10 million primarily due to $31 million of purchased electric capacity payments during the six months ended June 30, 2013 related to the Kewaunee PPA and higher cash flows from changes in production fuel inventory levels. These items were partially offset by lower cash flows from higher fuel-related costs during the six months ended June 30, 2014 compared to the same period in 2013.

Production Fuel Inventory Levels - Alliant Energy’s, IPL’s and WPL’s cash flows from operations increased $26 million, $19 million and $7 million, respectively, due to changes in production fuel inventory levels during the six months ended June 30, 2014 and 2013. IPL’s lower production fuel inventory levels were primarily due to lower volumes of coal delivered by barge due to weather impacts. WPL’s lower production fuel inventory levels were primarily due to lower volumes of coal delivered by railroad due to transportation constraints.

IPL’s Sales of Accounts Receivable Program - Changes in cash flows related to IPL’s sales of accounts receivable program increased (decreased) Alliant Energy’s and IPL’s cash flows from operations by ($19) million and $5 million during the six months ended June 30, 2014 and 2013, respectively. These changes were primarily due to changes in construction expenditures and other working capital requirements. In March 2014, IPL extended through March 2016 the purchase commitment from the third party to which it sells its receivables. Refer to Note 4(a) for additional details of IPL’s sales of accounts receivable program.

Electric Fuel-related, Natural Gas and Transmission Cost Recoveries - IPL has cost recovery mechanisms applicable for its retail electric and gas customers to provide for subsequent adjustments to its electric and gas rates for changes in electric fuel-related and natural gas costs. IPL also has a cost recovery mechanism applicable for its Iowa retail electric customers to provide for subsequent adjustments to its electric rates for changes in electric transmission service expenses. Changes in the timing of IPL’s electric fuel-related, natural gas and transmission cost recoveries resulted in $18 million of lower cash flows from operations for Alliant Energy and IPL during the six months ended June 30, 2014 compared to the same period in 2013.

### Investing Activities -

Six Months Ended June 30, 2014 vs. Six Months Ended June 30, 2013 - Alliant Energy’s cash flows used for investing activities increased $47 million primarily due to a $62 million cash grant Alliant Energy received during the six months ended June 30, 2013 related to its Franklin County wind project, partially offset by $9 million of lower utility construction expenditures. The lower utility construction expenditures were partially due to lower expenditures for emission controls projects at WPL’s Columbia Units 1 and 2 and IPL’s Ottumwa Unit 1 during the six months ended June 30, 2014, partially offset by higher expenditures for IPL’s and WPL’s electric and gas distribution systems and emission controls projects at WPL’s Edgewater Unit 5 during the six months ended June 30, 2014.

IPL’s cash flows used for investing activities increased $7 million due to $5 million of higher construction expenditures. The higher construction expenditures were largely due to higher expenditures for the electric and gas distribution systems during the six months ended June 30, 2014, partially offset by lower expenditures for emission controls projects at Ottumwa Unit 1 during the six months ended June 30, 2014.

WPL’s cash flows used for investing activities decreased $13 million primarily due to $14 million of lower construction expenditures. The lower construction expenditures were largely due to lower expenditures for emission controls projects at Columbia Units 1 and 2 during the six months ended June 30, 2014, partially offset by higher expenditures for emission controls projects at Edgewater Unit 5 and the electric and gas distribution systems during the six months ended June 30, 2014.

### Financing Activities -

Six Months Ended June 30, 2014 vs. Six Months Ended June 30, 2013 - Alliant Energy’s cash flows used for financing activities decreased $38 million primarily due to payments of $211 million to redeem IPL’s and WPL’s cumulative preferred stock in March 2013 and net changes in the amount of commercial paper outstanding at Alliant Energy, IPL and WPL. These items were partially offset by $200 million of proceeds from IPL’s issuance of cumulative preferred stock in March 2013.

IPL’s cash flows used for financing activities increased $25 million primarily due to $200 million of proceeds from the issuance of cumulative preferred stock in March 2013. This item was partially offset by payments of $150 million to redeem cumulative preferred stock in March 2013 and changes in the amount of commercial paper outstanding.

WPL’s cash flows used for financing activities increased $19 million primarily due to changes in the amount of commercial paper outstanding, partially offset by payments of $61 million to redeem cumulative preferred stock in March 2013.

Common Stock Issuances and Capital Contributions - Refer to Note 10(b) for discussion of Alliant Energy’s common stock issuances during the six months ended June 30, 2014 under its equity-based compensation plans for employees. Refer to Note 6 for discussion of capital contributions from Alliant Energy to IPL during the six months ended June 30, 2014.

Long-term Debt - In July 2014, IPL retired its $38.4 million, 5% pollution control revenue bonds.

Financing Forecast - Alliant Energy, IPL and WPL currently expect to issue approximately $500 million, $250 million and $250 million, respectively, of additional long-term debt in 2014.

**Creditworthiness -** In March 2014, Standard & Poor’s Rating Services affirmed the current credit ratings and outlooks for Alliant Energy, IPL and WPL. In April 2014, Alliant Energy withdrew Resources’ corporate credit rating from Standard & Poor’s Rating Services since there currently is no long-term debt outstanding at Resources.

**Off-Balance Sheet Arrangements -** A summary of Alliant Energy’s off-balance sheet arrangements is included in the 2013 Form 10-K and has not changed materially from the items reported in the 2013 Form 10-K, except as described below. Refer to Note 4(a) for information regarding IPL’s sales of accounts receivable program. Refer to Note 14(d) for information regarding various guarantees and indemnifications related to Alliant Energy’s prior divestiture activities.

### Certain Financial Commitments -

**Contractual Obligations -** A summary of Alliant Energy’s, IPL’s and WPL’s contractual obligations is included in the 2013 Form 10-K and has not changed materially from the items reported in the 2013 Form 10-K, except for the items described in Notes 8(b), 14(a) and 14(b).

### OTHER MATTERS

**Market Risk Sensitive Instruments and Positions -** A summary of market risks is included in the 2013 Form 10-K and such market risks have not changed materially from those reported in the 2013 Form 10-K, except as described below.

**Commodity Price -** Refer to Note 2 for discussion of amounts recorded by Alliant Energy and WPL on their balance sheets as of June 30, 2014 for fuel-related costs incurred by WPL during the six months ended June 30, 2014 that are expected to fall outside the approved bandwidth for 2014.

**New Accounting Pronouncements -** Refer to Note 1(b) for discussion of new accounting pronouncements impacting Alliant Energy, IPL and WPL.

**Critical Accounting Policies and Estimates -** A summary of critical accounting policies and estimates is included in the 2013 Form 10-K and such policies and estimates have not changed materially from those reported in the 2013 Form 10-K, except as described below.

**Contingencies -** Assumptions and judgments are made each reporting period regarding the future outcome of contingent events and loss contingency amounts are recorded for any contingent events that are both probable and reasonably estimated based upon current available information. Note 14 provides discussion of contingencies assessed at June 30, 2014, including various pending legal proceedings, guarantees and indemnifications that may have a material impact on financial condition and results of operations.

**Regulatory Assets and Regulatory Liabilities -** Assumptions and judgments are made each reporting period regarding whether regulatory assets are probable of future recovery and regulatory liabilities are probable future obligations. Note 2 provides details of the nature and amounts of regulatory assets and regulatory liabilities assessed at June 30, 2014, as well as material changes to regulatory assets and regulatory liabilities during the six months ended June 30, 2014.

**Long-Lived Assets -** Periodic assessments are completed each period regarding the recoverability of certain long-lived assets when factors indicate the carrying value of such assets may be impaired or such assets are planned to be sold. These assessments require significant assumptions and judgments by management. The long-lived assets assessed for impairment generally include assets within non-regulated operations that are proposed to be sold or are currently generating operating losses, and certain long-lived assets within regulated operations that may not be fully recovered from IPL’s and WPL’s customers as a result of regulatory decisions in the future.

During the six months ended June 30, 2014, Alliant Energy, IPL and WPL evaluated if any of their long-lived assets were no longer recoverable or if any impairment indicators were present. Such evaluation included assessing if there was a significant decrease in the expected cash flows from their long-lived assets within non-regulated operations, or for their long-lived assets within their regulated operations, any indication that all or a portion of the assets may be disallowed for rate-making purposes. Alliant Energy, IPL and WPL completed this assessment and concluded no impairment tests were required.

Franklin County Wind Project - Alliant Energy completed construction of its 99 MW Franklin County wind project and placed it into service in 2012. In 2012, Alliant Energy performed an impairment test of the carrying value of the Franklin County wind project given a significant change in the use of the asset as a result of it being placed into service, continued downturn in forward electricity prices in 2012 and no long-term off-take arrangement. The test concluded the undiscounted cash flows expected from the Franklin County wind project during its estimated useful life exceeded its carrying value as of December 31, 2012, resulting in no impairment. On a quarterly basis, Alliant Energy evaluates for significant changes in the undiscounted cash flows used in the 2012 impairment test, which may indicate a significant decrease in the market value of the Franklin County wind project. No significant changes in the undiscounted cash flows have been identified, and as a result, an impairment test was not required in 2013 or during the six months ended June 30, 2014. One of several factors that could have an effect on the future expected cash flows is the expenditures that may be required to replace key wind turbine components throughout the life of the wind project. An impairment of the Franklin County wind project could be triggered in the future if the replacement rate of key wind turbine components is sooner than initially estimated and the expenditures required to replace those key wind turbine components is significantly greater than originally estimated. As of June 30, 2014, the carrying value of the Franklin County wind project was $140 million and was recorded in “Non-regulated Generation property, plant and equipment” on Alliant Energy’s balance sheet.

**Unbilled Revenues -** Assumptions and judgments are made each reporting period to estimate the amount of unbilled revenues. At June 30, 2014, unbilled revenues related to Alliant Energy’s utility operations were $151 million ($73 million at IPL and $78 million at WPL). Note 4(a) provides discussion of IPL’s unbilled revenues as of June 30, 2014 sold to a third party related to its sales of accounts receivable program.

**Pensions and Other Postretirement Benefits -** Assumptions and judgments are made periodically to estimate the obligations and costs related to retirement plans. Note 10(a) provides additional details of pension and OPEB plans.

**Income Taxes -** Assumptions and judgments are made each reporting period to estimate income tax assets, liabilities, benefits and expenses. Critical assumptions and judgments are made each reporting period, including projections of future taxable income used to determine the ability to utilize net operating losses and credit carryforwards prior to their expiration and the states in which such future taxable income will be apportioned. Alliant Energy’s and IPL’s critical assumptions and judgments also include projections of qualifying repairs expenditures and allocation of mixed service costs due to the impact of Iowa rate-making principles on such property-related differences. Note 9 provides additional details of income taxes.

**Other Future Considerations -** In addition to items discussed earlier in MDA, the Notes in Item 1 and “Risk Factors” in Item 1A, the following items could impact future financial condition or results of operations:

### Electric Transmission Service Charges -

MISO Transmission Owner Return on Equity Complaint - In November 2013, a group of MISO industrial customer organizations filed a complaint with FERC requesting to reduce the base return on equity used by MISO transmission owners, including ITC and ATC, to 9.15%, and institute a regulatory capital structure not to exceed 50% of common equity, among other items. ITC’s and ATC’s current authorized return on equity is 12.38% and 12.2%, respectively. ITC’s and ATC’s current authorized regulatory capital structure for common equity is 60% and 50%, respectively.

In June 2014, FERC issued an order related to a similar previously filed complaint, which reduced the ISO-NE transmission owners’ authorized return on equity. Alliant Energy, IPL and WPL are currently unable to determine what, if any, impact the June 2014 FERC order and a new methodology FERC used in determining the return on equity may have on the November 2013 complaint filed by the group of MISO industrial customer organizations.

Any change to ITC’s and ATC’s return on equity and regulatory capital structure for common equity would impact the calculation of their respective Attachment “O” rates, resulting in changes to electric transmission service costs billed by ITC and ATC to their customers. Any changes in IPL’s electric transmission service costs billed by ITC to IPL are expected to be passed on to IPL’s Iowa retail electric customers through the transmission cost recovery rider. Any changes in WPL’s electric transmission service costs will be incorporated into WPL’s retail electric rates in a future retail electric base rate proceeding with the PSCW. Pursuant to the July 2014 PSCW order related to WPL’s Wisconsin retail electric and gas rate case (2015/2016 Test Period), WPL received escrow treatment for the difference between actual electric transmission service costs and those costs used to determine rates during 2015 and 2016.

In addition, any change to ATC’s return on equity could result in Alliant Energy and WPL realizing lower equity income and dividends from ATC in the future. Alliant Energy and WPL currently estimate each 25 basis point reduction in ATC’s authorized return on equity would reduce their annual pre-tax equity income from ATC by approximately $1 million. Alliant Energy, IPL and WPL are currently unable to determine the timing and nature of any FERC action related to these matters and resulting changes to their financial condition and results of operations.

MISO Attachment “O” Protocols - In 2012, IPL filed comments in a FERC inquiry related to MISO’s Attachment “O” protocols. In May 2013, FERC issued an order that determined the MISO Attachment “O” protocols to be insufficient. FERC ordered MISO and the impacted transmission owners, including ITC and ATC, to make certain changes to their formula rate protocols. The revised protocols filed by the MISO transmission owners included changes to formalize the process for relevant parties to request information from transmission owners and file disputes related to formula rates, as well as establish timelines for such processes. In March 2014, FERC issued an order accepting the revised protocols filed by MISO transmission owners, including ITC and ATC, with conditions that certain additional changes be made. In April 2014, the Organization of MISO States, Inc. requested a rehearing and clarification of FERC’s March 2014 order. In May 2014, the MISO transmission owners filed a revised compliance filing. In June 2014, various parties filed protests and comments regarding procedural, timeline and calculation components of the May 2014 compliance filing. Alliant Energy, IPL and WPL are currently unable to determine the nature and timing of any subsequent MISO transmission owner or FERC actions, or what impacts the changes in protocols will have on their future electric transmission service charges.

**Electric Sales Projections -**

Summer of 2014 Temperatures - In July 2014, Alliant Energy, IPL and WPL experienced significantly cooler than normal weather conditions in their service territories. The weather conditions in July 2014 are expected to result in a decrease in IPL’s and WPL’s electric sales and margins compared to July 2013 due to decreased air conditioning requirements of their customers. The estimated impact on electric margins was as follows (in millions):

| Estimated electric margin increases (decreases) compared to normal weather: | July 2014 | July 2013 |
| --- | --- | ---: |
| IPL | **($9-$11)** | $— |
| WPL | **(5-7)** | 1 |
| Alliant Energy | **($14-$18)** | $1 |

### Sales Trends -

Jo-Carroll - In March 2014, Jo-Carroll provided notice of termination of its wholesale power supply agreement with IPL effective April 1, 2018. Sales to Jo-Carroll represented 2% of IPL’s total electric sales in 2013.

Eagle Point - In January 2012, Eagle Point filed a Petition for Declaratory Order requesting that the IUB declare Eagle Point is not a public utility subject to the service territory laws in Iowa. Specifically, Eagle Point sought to sell directly to the City of Dubuque the power generated by a 175 kilowatt solar unit installed on the City of Dubuque’s property. IPL, MidAmerican, the Iowa Association of Electric Cooperatives, a coalition of solar power advocates, and the Iowa Office of Consumer Advocate actively participated in the related IUB proceeding. In April 2012, the IUB issued an order finding that Eagle Point’s proposed arrangement would make it a public utility operating in IPL’s exclusive service territory in violation of Iowa’s service territory laws. In May 2012, Eagle Point requested review of the IUB’s April 2012 order from the Polk County, Iowa District Court. In March 2013, the District Court issued a ruling that vacated the IUB’s decision, and found Eagle Point did not constitute a public utility and could enter into its proposed direct sales arrangement with the City of Dubuque. In April 2013, IPL and MidAmerican filed a joint Notice of Appeal with the Iowa Supreme Court. The IUB and the Iowa Association of Electric Cooperatives also filed Notices of Appeal with the Iowa Supreme Court, and Eagle Point submitted a Notice of Cross-Appeal. In July 2014, the Iowa Supreme Court issued a ruling affirming the District Court’s decision. Alliant Energy and IPL are currently unable to determine the impact this ruling may have on IPL’s future electric sales.

**System Support Resource -** In 2013, MISO designated another utility’s EGU (Presque Isle) as an SSR, which is located in an area for which ATC provides transmission services. In January 2014, MISO filed an SSR agreement with FERC, which established an annual revenue requirement for the owner of the designated EGU of approximately $52 million, effective February 1, 2014. The revenue requirement was requested to be allocated among ATC’s customers located in the area for which ATC provides transmission services, including WPL. In April 2014, FERC accepted the SSR agreement and related cost allocation effective February 1, 2014. Based on FERC’s April 2014 decision, WPL’s share of the annual revenue requirement was originally expected to be approximately $10 million.

In April 2014, the PSCW filed a complaint with FERC, requesting that FERC find the MISO SSR cost allocation for ATC to be unjust and unreasonable. In July 2014, FERC issued an order directing MISO to make a compliance filing to revise the cost allocation pursuant to the PSCW’s complaint effective April 3, 2014. As a result, WPL is currently unable to estimate its allocated SSR costs; however, WPL expects its costs to decrease from the prior estimate as a result of the July 2014 FERC order.

Although MISO’s tariff only allows SSR agreements with a term of one year, WPL expects that the Presque Isle SSR agreement and revenue requirement could be extended for several years until transmission facilities are constructed to eliminate the need for this EGU. WPL’s approved retail electric rate case (2015/2016 Test Period) included recovery of estimated deferred SSR costs through 2014, subject to review in a future retail electric rate case proceeding, and established escrow treatment for SSR costs during 2015 and 2016.

## Market risk

As filed, 148 characters.

Quantitative and Qualitative Disclosures About Market Risk are reported in “Other Matters - Market Risk Sensitive Instruments and Positions” in MDA.

## Controls and procedures

As filed, 907 characters.

Alliant Energy’s, IPL’s and WPL’s management evaluated, with the participation of each of Alliant Energy’s, IPL’s and WPL’s CEO, CFO and Disclosure Committee, the effectiveness of the design and operation of Alliant Energy’s, IPL’s and WPL’s disclosure controls and procedures (as defined in Rule 13a-15(e) of the Securities Exchange Act of 1934) as of June 30, 2014 pursuant to the requirements of the Securities Exchange Act of 1934. Based on their evaluation, the CEO and the CFO concluded that Alliant Energy’s, IPL’s and WPL’s disclosure controls and procedures were effective as of June 30, 2014.

There was no change in Alliant Energy’s, IPL’s and WPL’s internal control over financial reporting that occurred during the quarter ended June 30, 2014 that has materially affected, or is reasonably likely to materially affect, Alliant Energy’s, IPL’s or WPL’s internal control over financial reporting.

## Risk factors

As filed, 167 characters.

A summary of risk factors is included in Item 1A in the 2013 Form 10-K and such risk factors have not changed materially from the items reported in the 2013 Form 10-K.

Filed Aug 7, 2014.