## Management's discussion and analysis

As filed, 30,470 characters.

*In connection with the "safe harbor" provisions of the Private Securities Litigation Reform Act of 1995, the following discussion contains trend analysis and other forward-looking statements. Forward-looking statements can be identified by the use of words such as "intends", "anticipates", "believes", "estimates", "projects", "forecasts", "expects", "plans" and "proposes". Although we believe that the expectations reflected in these forward-looking statements are based on reasonable assumptions, there are a number of risks and uncertainties that could cause actual results to differ materially from these forward-looking statements. These include, among others, our ability to maximize value from our Cadiz, California land and water resources; and our ability to obtain new financings as needed to meet our ongoing working capital needs. See additional discussion under the heading “Risk Factors” in Item 1A of our Annual Report on Form 10-K for the year ended December 31, 2010.*

### Overview

Our primary asset consists of 45,000 acres of land located in three areas of eastern San Bernardino County, California. Virtually all of this land is underlain by high-quality, naturally recharging groundwater resources, and is situated in proximity to the Colorado River and the Colorado River Aqueduct, a major source of imported water for Southern California. Our main objective is to realize the highest and best use of these land and water resources in an environmentally responsible way.

In 1993, we secured permits for up to 9,600 acres of agricultural development at our 35,000-acre property in the Cadiz Valley and the withdrawal of more than one million acre-feet of groundwater from the underlying aquifer system. Since that time, we have maintained various levels of agricultural development at the property and this development has provided our principal source of revenue. Although sustainable agricultural development is an important and enduring component of our business, we believe that the long-term value of our assets can best be derived through the development of a combination of water supply, water storage, and solar energy projects at our properties.

The primary factors that drive the value of water supply projects are continued population growth and increasing pressure on water supplies throughout California. Southern California now faces the prospect of long-term and systematic water supply shortages resulting from restrictions on each of its three imported water sources: the State Water Project, the Colorado River and the Los Angeles Aqueduct. As a result of these restrictions, water agencies must overcome significant long-term supply deficiencies to meet existing and projected demands. For example, despite experiencing above-average rainfall this past winter, ongoing environmental and regulatory restrictions affecting California’s water supplies and infrastructure continue to limit water deliveries from the imported supply sources. Given that the present imbalance in annual supply and demand is projected to continue for many years into the future, water agencies are evaluating new sources of supply as a method to off-set their existing shortages.

Opportunities in the solar energy production market are being driven by a series of policy initiatives issued by the State of California and the United States government. This includes California’s mandate to acquire 33% of the state’s electricity from renewable sources by 2020 and federal efforts to accelerate the development of renewable energy and energy transmission projects in the Mojave Desert. Energy companies, government agencies and environmental organizations are actively working to identify suitable locations for solar energy development to meet future energy needs and have encouraged development on private lands.

As a result of these developments in the water and energy sectors, we plan to continue to pursue water supply, water storage and solar energy projects at our properties. At present, our development efforts are primarily focused on the Cadiz Valley Water Conservation, Recovery and Storage Project (“Water Project”), which involves the conservation of groundwater that is otherwise lost to evaporation from the aquifer system beneath our property in the Cadiz Valley. *(see Water Resource Development)* We believe that the ultimate implementation of this Water Project will create the primary source of our future cash flow and, accordingly, our working capital requirements relate largely to the development activities associated with this Water Project.

### Water Resource Development

The Water Project proposes to capture, conserve and store groundwater that would otherwise be lost to evaporation from dry lakes near our Cadiz Valley property and provide a new, reliable water supply for Southern California. The Water Project will be designed, constructed and operated in accordance with established groundwater management principles so as to maximize the reasonable and beneficial use of groundwater, and avoid waste and harm to the surrounding environment or other consumptive users.

In general, several elements are needed to complete such a project: (1) a pipeline right-of-way from the Colorado River Aqueduct to the Water Project area; (2) storage and supply agreements with one or more public water agencies or private water utilities; (3) environmental permits; and (4) construction and working capital financing. As described below, the first three elements have been progressed on a concurrent basis. The fourth is dependent on actions arising from the completion of the first three.

#### (1) A Pipeline Righ-of-Way from the Colorado River Aquedut to the Water Project Area

In September 2008, we secured a right-of-way for the Water Project’s water conveyance pipeline by entering into a lease agreement with the Arizona & California Railroad Company. The agreement allows for the use of a portion of the railroad’s right-of-way for a period up to 99 years to construct and operate the Water Project’s water conveyance pipeline. The pipeline would be used to convey water between our Cadiz Valley property and the Colorado River Aqueduct.

#### (2) Storage and Supply Agreements with One or More Public Water Agencies or Private Water Utilities

In June 2010, we entered into option and environmental cost sharing agreements with three water providers: Santa Margarita Water District (“Santa Margarita”), Golden State Water Company (a wholly-owned subsidiary of American States Water \[NYSE: AWR\]), and Three Valleys Municipal Water District. The three water providers serve more than one million customers in cities throughout California’s San Bernardino, Riverside, Los Angeles, Orange and Ventura Counties.

In September 2010, we entered into option and environmental cost sharing agreements with Suburban Water Systems, a wholly-owned subsidiary of SouthWest Water Company. Suburban Water Systems provides water to a population of approximately 300,000 people in a 42-square-mile service area across California's Los Angeles and Orange counties.

In May 2011, we entered into an option agreement with Jurupa Community Services District (“JCSD”). JCSD provides water and sewer services in an unincorporated 48-square mile service area of western Riverside County, California.

Under the terms of the option agreements with the five water providers, upon completion of the Water Project’s California Environmental Quality Act (“CEQA”) review, each agency will have the right to acquire an annual supply of 5,000 acre-feet of water at a pre-determined formula competitive with their incremental cost of new water. SMWD also has the option to purchase an additional 10,000 acre-feet of water per year. The agencies also have options to acquire carry-over storage rights in the Water Project to allow them to manage their supplies in complement with their other water resources. The option agreements had no impact to our operations, financial position, or cash flows for the three months ended March 31, 2011.

We continue to work with additional water providers interested in acquiring rights to the remaining annual supply expected to be conserved by the Water Project and are in discussions with third parties regarding the imported storage aspect of this Project. We have also begun to develop an operating plan for the Water Project that will manage the delivery of conserved water to the Project’s subscribers.

#### (3) Environmental Permits

In order to properly develop and quantify the sustainability of the Water Project, and prior to initiating the formal permitting process for the Water Project, we commissioned internationally recognized environmental consulting firm CH2M HILL to complete a comprehensive study of the water resources at the Project area. Following a year of analysis, CH2M HILL released its study of the aquifer system in February 2010. Utilizing new models produced by the U.S. Geological Survey in 2006 and 2008, the study estimated the total groundwater in storage in the aquifer system to be between 17 and 34 million acre-feet, a quantity on par with Lake Mead, the nation’s largest surface reservoir. The study also identified a renewable annual supply of native groundwater in the aquifer system currently being lost to evaporation. CH2M Hill’s findings, which were peer reviewed by leading groundwater experts, confirmed that the aquifer system could sustainably support the Water Project.

Further, and also prior to beginning the formal environmental permitting process, we entered into a Memorandum of Understanding with the Natural Heritage Institute (“NHI”), a leading global environmental organization committed to protecting aquatic ecosystems, to assist with our efforts to sustainably manage the development of our Cadiz Valley property. As part of this “Green Compact,” we follow stringent plans for groundwater management and habitat conservation, and will create a groundwater monitoring plan for the Water Project.

As discussed in (2), above, we entered into environmental cost sharing agreements with all participating water providers. The environmental cost sharing agreements created a framework for funds to be committed by each participant to share in the costs associated with the CEQA review work. SMWD is serving as the lead agency for the review process. In July 2010, ESA Associates, a leading environmental consulting firm, was retained to prepare the Water Project’s formal CEQA documentation.

A Notice of Preparation (NOP) of a Draft Environmental Impact Report (DEIR) formally commencing the public portion of the CEQA process was issued in February 2011 by SMWD, and a 30-day scoping comment period was initiated at that time. Two public scoping meetings were held in March 2011. Preparation of the DEIR by ESA and SMWD is ongoing and the document is expected to be released for public review and comment following consideration of comments received during the scoping period.

In April 2011, a 13-member Groundwater Stewardship Committee (“GSC”) comprised of leading national groundwater experts was formed by SMWD and other project participants, including the Company, to review historical and recently collected field data and modeling work and provide advice and recommendations for the Water Project’s proposed operating plan and monitoring program. Members of the GSC have been drawn from various sectors and include individuals from regulatory institutions, non-governmental organizations, academia, and the professional groundwater industry, all with extensive experience on similar projects. The work of the GSC is being conducted concurrently with the Project’s CEQA environmental review and permitting process. The operating plan and monitoring plans will be components of the DEIR document.

#### (4) Construction and Working Capital

Once the environmental review is concluded, we expect that we will complete economic agreements with the Water Project participants and make arrangements for the construction phase of the Water Project. Construction would consist of wellfield facilities at our Cadiz Valley property and a conveyance pipeline extending approximately 44 miles along the right-of-way described in (1), above, from the wellfield to the Colorado River Aqueduct.

### Agricultural Development

Within the Cadiz Valley property, 9,600 acres have been zoned for agriculture. The infrastructure includes seven wells that are interconnected within this acreage, with total annual production capacity of approximately 13,000 acre-feet of water. Additionally, there are housing and kitchen facilities that support up to 300 employees. The underlying groundwater, fertile soil, and desert temperatures are well suited for a wide variety of fruits and vegetables.

Permanent crops currently in commercial production include 160 acres of vineyards of certified-organic, dried-on-the-vine raisins and 260 acres of lemons. Both of these crops are farmed using sustainable agricultural practices. Seasonal vegetable crops in production include squash and beans. All seasonal vegetable crops are grown organically.

We currently derive our agricultural revenues through the sale of our products in bulk or through independent packing facilities. We incur all of the costs necessary to produce and harvest our organic raisin crop. These raisins are then sold in bulk to a raisin processing facility. We also incur all of the costs necessary to produce our lemon crop. Once harvested, the lemons are shipped in bulk to a packing and sales facility. In 2009, we entered into a lease agreement with a third party to develop up to an additional 500 acres of lemon orchards. We expect to receive lease income once the new lemon orchards reach commercial production through a profit sharing agreement within the lease. The first 110 acres of this new orchard have been planted as of April 2011.

Although we plan to maintain our agricultural development, revenues will continue to vary from year to year based on acres in development, crop yields, and prices. Further, we do not believe that our agricultural revenues are likely to be material to our overall results of operations once we begin to receive revenues from the Water Project.

### Other Development Opportunities

In addition to the development projects described above, we believe that our landholdings are suitable for other types of development, including solar energy production. Located in an area with strong solar irradiation, proximity to existing utility corridors, appropriate topography, and access to water supplies, our properties could provide an ideal setting for solar energy generation. Moreover, state, federal and local government entities, along with environmental organizations, have issued compelling calls to increase the production of renewable energy to reduce greenhouse gas emissions and the consumption of imported fossil fuels. Solar energy development on private land, particularly in the Mojave Desert region where our properties are located, is being encouraged as an alternative to the use of federal desert lands.

We believe that our significant, contiguous private landholdings in the Mojave Desert could provide an alternative to the use of federal lands for new solar facilities in the region. Up to 20,000 acres at our Cadiz Valley property could potentially be made available for solar energy projects. We are presently in discussions with energy companies interested in utilizing our landholdings for various types of solar energy development.

In addition to solar energy development, we believe that over the longer-term, the population of Southern California, Nevada, and Arizona will continue to grow, and that, in time, the economics of commercial and residential development of our properties will become attractive.

We remain committed to the ongoing sustainable use of our land and water assets, and will continue to explore all opportunities for environmentally-responsible development of these assets. We cannot predict with certainty which of these various opportunities will ultimately be utilized.

### Results of Operations

### Three Months Ended March 31, 2011, Compared to Three Months Ended March 31, 2010

We have not received significant revenues from our water resource and real estate development activity to date. As a result, we have historically incurred a net loss from operations. We had revenues of $457 thousand for the three months ended March 31, 2011, and $3 thousand for the three months ended March 31, 2010. We incurred a net loss of $4.3 million in the three months ended March 31, 2011, compared with a $5.2 million net loss during the three months ended March 31, 2010. The lower 2011 loss was primarily due to lower stock based non-cash compensation costs related to options issued in 2010 under the 2009 Equity Incentive Plan.

Our primary expenses are our ongoing overhead costs associated with the development of the Water Project (i.e. general and administrative expense) and our interest expense. We will continue to incur non-cash expenses in connection with our management and director equity incentive compensation plans.

***Revenues*** We had revenues of $457 thousand for the three months ended March 31, 2011, and $3 thousand for the three months ended March 31, 2011. The increase in revenue in 2011 was primarily due to a larger and longer 2010-2011 lemon harvest season in comparison to the 2009-2010 lemon harvest year.

***Cost of Sales*** Cost of sales totaled $432 thousand for the three months ended March 31, 2011, and $0 for the three months ended March 31, 2010. The higher cost of sales reflects higher lemon harvesting and marketing costs due to the larger size of the 2010-2011 lemon crop.

***General and Administrative Expenses*** General and administrative expenses were $3.0 million during the three months ended March 31, 2011, and $4.1 million during the three months ended March 31, 2010. Non-cash compensation costs for stock and option awards are included in General and Administrative Expenses. The lower 2011 expense was primarily due to lower stock based non-cash compensation costs related to options issued in 2010 under the 2009 Equity Incentive Plan.

Compensation costs from stock and option awards for the three months ended March 31, 2011, were $1.2 million, compared with $2.1 million for the three months ended March 31, 2010. The expense reflects the vesting schedules of the stock and option awards under the 2007 and 2009 equity incentive plans.

Other General and Administrative Expenses, exclusive of stock based compensation costs, totaled $1.7 million and $2.0 million for the three months ended March 31, 2011 and 2010, respectively.

***Depreciation*** Depreciation expense totaled $89 thousand for the three months ended March 31, 2011, and $99 thousand for the three months ended March 31, 2010.

***Interest Expense, net*** Net interest expense totaled $1.2 million during the three months ended March 31, 2011, compared to $1.0 million during the same period in 2010. The following table summarizes the components of net interest expense for the two periods (in thousands):

|  | Three Months Ended March 31, 2011 | 2010 |
| --- | ---: | ---: |
| Interest on outstanding debt | $771 | $655 |
| Amortization of financing costs | 19 | 10 |
| Amortization of debt discount | 555 | 370 |
| Interest income | (2) | (2) |
|  | $1,343 | $1,033 |

See Notes to the Consolidated Financial Statements: Note 3 – Long-term Debt.

***Other Income, net*** Net other income for the three months ended March 31, 2011, was $121 thousand, and $0 for the three months ended March 31, 2010. The amount recorded in 2011 is in connection to the derivative liability related to certain of the Term Loan’s conversion options. This derivative liability had a fair value of $330 thousand at March 31, 2011, and will be marked-to-market at the end of each reporting period and recorded as other income (expense). See Notes to the Consolidated Financial Statements: Note 3 – Long-term Debt.

***Income Taxes*** Income tax expense for the three months ended March 31, 2011, was $2 thousand, and $1 thousand for the three months ended March 31, 2010. See Notes to the Consolidated Financial Statements: Note 6 – Income Taxes.

### Liquidity and Capital Resources

### Current Financing Arrangements

As we have not received significant revenues from our water resource, agricultural and renewable energy development activity to date, we have been required to obtain financing to bridge the gap between the time water resource and other development expenses are incurred, and the time that revenue will commence. Historically, we have addressed these needs primarily through secured debt financing arrangements, private equity placements and the exercise of outstanding stock options and warrants.

We have worked with our secured lenders to structure our debt in a way which allows us to continue our development of the Water Project and minimize the dilution of the ownership interests of common stockholders. In June 2006, we entered into a $36.4 million five year zero coupon senior secured convertible term loan with Peloton Partners LLP and another lender (the “Term Loan”). On April 16, 2008, we were advised that Peloton had assigned its interest in the Term Loan to an affiliate of Lampe Conway & Company LLC (“Lampe Conway” or “Lenders”), and Lampe Conway subsequently replaced Peloton as administrative agent of the loan. On June 4, 2009, we completed arrangements to extend the maturity date of the Term Loan from June 29, 2011 to June 29, 2013 with interest continuing to accrue at 6% per annum though maturity. Further, the conversion feature was modified to allow up to $4.55 million of principal to be converted into 650,000 shares of Cadiz common stock at a conversion price of $7 per share, and the remaining principal and interest to be converted into shares of Cadiz common stock at a conversion price of $35 per share.

On October 19, 2010, we closed a new $10 million working capital facility with our existing Lenders. Under the terms of the new $10 million facility, we drew the first $5 million on the Closing Date (“First Tranche”). At our option, we may draw up to an additional $5 million over the 12 months following the Closing Date (“Second Tranche”). All interest on outstanding balances will accrue at 6%, with no principal or interest payments required before the new facility’s June 29, 2013 maturity date, consistent with our existing term debt facility. The First Tranche (including accrued interest) is convertible at any time into our common stock at a price of $13.50 per share, and the Second Tranche (including accrued interest), if drawn, would be convertible into our common stock at $12.50 per share.

Also on the Closing Date, our existing debt facility with the Lenders, which as of September 30, 2010, had $45.65 million outstanding, was modified as to certain of its conversion features. $20.62 million of the existing convertible debt has been changed to allow for up to $2.5 million of this amount to be converted at any time into our common stock at the price of $13.50 per share, with the remaining amount becoming non-convertible. If the Second Tranche is drawn, approximately $20 million of additional existing debt would be changed to allow for up to $5 million of this amount to be converted at any time into our common stock at $12.50 per share, with the remaining amount becoming non-convertible. The final $4.55 million of the existing debt continues to be convertible at $7 per share.

The debt covenants associated with the loan were negotiated by the parties with a view towards our operating and financial condition as it existed at the time the agreements were executed. At March 31, 2011, the Company was in compliance with its debt covenants.

Additionally, as a result of private placements conducted in 2008 and 2009, the Company has 165,000 common stock purchase warrants outstanding that are exercisable at $12.50 and expire in November and December of 2011, and 226,200 common stock purchase warrants outstanding that are exercisable at $15.00 and expire in October and November of 2012. If these warrants were fully exercised, they would result in proceeds of approximately $5.4 million to the Company.

As we continue to actively pursue our business strategy, additional financing will be required. See “Outlook”, below. The covenants in the Term Loan do not prohibit our use of additional equity financing and allow us to retain 100% of the proceeds of any equity financing. We do not expect the loan covenants to materially limit our ability to finance our water development activities.

At March 31, 2011, we had no outstanding credit facilities other than the Convertible Term Loan.

**Cash Used for Operating Activities.** Cash used for operating activities totaled $2.0 million and $2.3 million for the three months ended March 31, 2011 and 2010, respectively. The first quarter cash requirements are typically seasonally higher than those required for the remaining quarters due to cultural costs incurred in the agricultural operations and the timing of certain administrative costs. The cash was primarily used to fund general and administrative expenses related to our resource development efforts.

**Cash Used In Investing Activities.** Cash used in investing activities during the three months ended March 31, 2011, was $1.1 million, compared with $352 thousand during the same period in 2010. The 2011 period included additional investments in well-field and environmental work related to progressing the Water Project.

**Cash Used In Financing Activities.** Cash used in financing activities was $4 thousand during the three months ended March 31, 2011, compared with $7 thousand during the comparable prior year period.

### Outlook

**Short Term Outlook**. Our $10 million working capital facility, which closed on October 19, 2010, together with our existing cash resources, provide us with sufficient funds to meet our expected working capital needs through fiscal year 2011. Based on our current and anticipated usage of cash resources, we will require additional working capital commencing during the second quarter of fiscal 2012 to meet our cash resource needs from that point forward and to continue to finance our operations until such time as our asset development programs produce revenues. If we are unable to generate this from our current development activities, then we will need to seek additional debt or equity financing in the capital markets. We expect to continue our historical practice of structuring our financing arrangements to match the anticipated needs of our development activities. See "Long Term Outlook", below. No assurances can be given, however, as to the availability or terms of any new financing.

**Long Term Outlook.** In the longer term, we will need to raise additional capital to finance working capital needs, capital expenditures and any payments due under our senior secured convertible term loan at maturity. See “Current Financing Arrangements” above. Payments will be due under the term loan only to the extent that lenders elect not to exercise equity conversion rights prior to the loan’s final maturity date. Our future working capital needs will depend upon the specific measures we pursue in the entitlement and development of our water resources and other development. Future capital expenditures will depend primarily on the progress of the Water Project. We will evaluate the amount of cash needed, and the manner in which such cash will be raised, on an ongoing basis. We may meet any future cash requirements through a variety of means, including debt or equity placements, or through the sale or other disposition of assets. Equity placements would be undertaken only to the extent necessary, so as to minimize the dilutive effect of any such placements upon our existing stockholders. Limitations on our liquidity and ability to raise capital may adversely affect us. Sufficient liquidity is critical to meet our resource development activities. However, liquidity in the currently dislocated capital markets has been severely constrained since the beginning of the credit crisis. Although we currently expect our sources of capital to be sufficient to meet our near term liquidity needs, there can be no assurance that our liquidity requirements will continue to be satisfied. If we cannot raise needed funds, we might be forced to make substantial reductions in our operating expenses, which could adversely affect our ability to implement our current business plan and ultimately our viability as a company.

### Recent Accounting Pronouncements

See Note 1 to the Consolidated Financial Statements – Description of Business and Summary of Significant Accounting Policies.

### Certain Known Contractual Obligations

*(in thousands)*

| Contractual Obligations | Payments Due by Period Total | 1 year or less | 2-3 years | 4-5 years | After 5 years |
| --- | ---: | ---: | ---: | ---: | ---: |
| Long-term debt obligations | $52,199 | $16 | $52,183 | $- | $- |
| Interest Expense | 7,591 | 1 | 7,590 | - | - |
| Operating leases | 525 | 312 | 213 | - | - |
|  | $60,315 | $329 | $59,986 | $- | $- |

Not included in the table above is a potential obligation to pay an amount of up to 1% of the net present value of the Water Project in consideration of certain legal and advisory services to be provided to us by Brownstein Hyatt Farber Schreck LLP. The primary services being provided are advising us as to Water Project design and implementation, permit approvals, environmental compliance, negotiation and drafting of agreements related to the Water Project. This fee would be payable upon receipt of all environmental approvals and permits and the execution of binding agreements for at least 51% of the Water Project’s annual capacity. A portion of this fee may be payable in stock. Interim payments of up to $1.5 million, to be credited against the final total, would be made upon the achievement of certain specified milestones. $500 thousand of these interim payments was earned in June 2009 in consideration for the legal and advisory services previously provided. This arrangement may be terminated by either party upon 60 days notice, with any compensation earned but unpaid prior to termination payable following termination.

## Market risk

As filed, 200 characters.

As of March 31, 2011, all of the Company's indebtedness bore interest at fixed rates; therefore, the Company is not exposed to market risk from changes in interest rates on long-term debt obligations.

## Controls and procedures

As filed, 1,648 characters.

### Disclosure Controls and Procedures

The Company established disclosure controls and procedures to ensure that material information related to the Company, including its consolidated entities, is accumulated and communicated to senior management, including the Chairman and Chief Executive Officer (the “Principal Executive Officer”) and Chief Financial Officer (the “Principal Financial Officer”) and to its Board of Directors. Based on their evaluation as of March 31, 2011, the Company's Principal Executive Officer and Principal Financial Officer have concluded that the Company's disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Securities Exchange Act of 1934) are effective to ensure that the information required to be disclosed by the Company in the reports that it files or submits under the Securities Exchange Act of 1934 is recorded, processed, summarized and reported within the time periods specified in Securities and Exchange Commission rules and forms, and such information is accumulated and communicated to management, including the principal executive and principal financial officers as appropriate, to allow timely decisions regarding required disclosures.

### Changes in Internal Controls Over Financial Reporting

In connection with the evaluation required by paragraph (d) of Rule 13a-15 under the Exchange Act, there was no change identified in the Company's internal controls over financial reporting that occurred during the last fiscal quarter that has materially affected, or is reasonably likely to materially affect, the Company's internal controls over financial reporting.

## Risk factors

As filed, 167 characters.

There have been no material changes to the factors disclosed in Item 1A. Risk Factors in the Company's Annual Report on Form 10-K for the year ended December 31, 2010.