# Cadiz Inc: Form 10-Q for the period ended Mar 31, 2014

- Company: [Cadiz Inc](/companies/cdzi.md) (CIK 727273)
- Form: 10-Q
- Filed: 2014-05-08
- Accepted by EDGAR: May 8, 2014, 14:30 ET
- Period: 2014-03-31
- Accession: 0000727273-14-000007
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/727273/000072727314000007/form10q_mar2014.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/727273/000072727314000007/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2014-03-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2014-01-01 to 2014-03-31 | $4.0k | us-gaap:Revenues |
| Operating income | 3 months, 2014-01-01 to 2014-03-31 | −$2.6m | us-gaap:OperatingIncomeLoss |
| Income tax | 3 months, 2014-01-01 to 2014-03-31 | $1.0k | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2014-01-01 to 2014-03-31 | −$4.7m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2014-01-01 to 2014-03-31 | −$0.29 | us-gaap:EarningsPerShareBasicAndDiluted |
| Diluted shares (weighted) | 3 months, 2014-01-01 to 2014-03-31 | 16,166,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months, 2014-01-01 to 2014-03-31 | −$4.4m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Cash and equivalents | at 2014-03-31 | $7.5m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2014-03-31 | $8.4m | us-gaap:AssetsCurrent |
| Total assets | at 2014-03-31 | $60.2m | us-gaap:Assets |
| Current liabilities | at 2014-03-31 | $1.3m | us-gaap:LiabilitiesCurrent |
| Total liabilities | at 2014-03-31 | $101.4m | us-gaap:Liabilities |
| Long-term debt | at 2014-03-31 | $98.4m | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2014-03-31 | $11.0k | us-gaap:LongTermDebtCurrent |
| Shareholders' equity | at 2014-03-31 | −$41.2m | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 38,606 characters.

*In connection with the "safe harbor" provisions of the Private Securities Litigation Reform Act of 1995, the following discussion contains trend analysis and other forward-looking statements. Forward-looking statements can be identified by the use of words such as "intends", "anticipates", "believes", "estimates", "projects", "forecasts", "expects", "plans" and "proposes". Although we believe that the expectations reflected in these forward-looking statements are based on reasonable assumptions, there are a number of risks and uncertainties that could cause actual results to differ materially from these forward-looking statements. These include, among others, our ability to maximize value from our Cadiz, California land and water resources; and our ability to obtain new financings as needed to meet our ongoing working capital needs. See additional discussion under the heading “Risk Factors” in Item 1A of our Annual Report on Form 10-K for the year ended December 31, 2013.*

### Overview

At present, our water development efforts are primarily focused on the Cadiz Valley Water Conservation, Recovery and Storage Project (“Water Project” or “Project”), which will capture and conserve millions of acre-feet of native groundwater currently being lost to evaporation from the aquifer system beneath our Cadiz Valley property and deliver it to water providers throughout Southern California (see “Water Resource Development”). We believe that the ultimate implementation of this Water Project will create the primary source of our future cash flow and, accordingly, our working capital requirements relate largely to the development activities associated with this Water Project. During the quarter ended March 31, 2014, we completed arguments against the California Environmental Quality Act (“CEQA”) claims challenging our existing Water Project approvals. On May 1, 2014, the trial court issued a ruling in these matters, which denied all pending CEQA claims and upheld all existing Water Project approvals. See Part II – Other Information, Item 1. Legal Proceedings.

We are a land and water resource development company with 45,000 acres of land in three separate areas of eastern San Bernardino County, California. Virtually all of this land is underlain by high-quality, naturally recharging groundwater resources, and is situated in proximity to the Colorado River and the Colorado River Aqueduct (“CRA”), the major source of imported water for Southern California. Our main objective is to realize the highest and best use of these land and water resources in an environmentally responsible way.

For more than 20 years, we have maintained an agricultural development at our 34,000-acre property in the Cadiz Valley, relying upon groundwater from the underlying aquifer system for irrigation. In 1993, we secured permits to develop agriculture on up to 9,600 acres of the Cadiz Valley property and withdraw more than one million acre-feet of groundwater from the underlying aquifer system. Since that time, we have maintained various levels of agriculture at the property and this operation has provided our principal source of revenue.

In addition to our sustainable agricultural operations, we believe that the long-term value of our land assets can best be derived through the development of a combination of water supply and storage projects at our properties. The primary factor driving the value of such projects is continuing pressure on water supplies throughout California, including environmental and regulatory restrictions on each of the State’s three main water sources: the State Water Project, the CRA and the Los Angeles Aqueduct. Southern California’s water providers rely on imports from these systems for a majority of their water supplies, but deliveries from all three into the region have been below capacity over the last several years. Availability of supplies in California also differs greatly from year to year due to natural hydrological variability. In January 2014, California’s Governor declared a drought emergency for the entire state as a result of record-low winter precipitation and depleted reservoir storage levels. Water deliveries from the State Water Project, which provides water supplies from Northern California to the central and southern parts of the state, have been limited to just 5% of capacity for 2014 in response to below-average precipitation as well as ongoing regulatory restrictions. With the region’s population expected to continue to grow, Southern California water providers are actively seeking new, reliable supply solutions to plan for long-term water needs and anticipated limitations of traditional water supplies.

We also continue to explore additional uses of our land and water resource assets, including additional agricultural opportunities, the development of a land conservation bank on our properties outside the Water Project area and other long-term legacy uses of our properties, such as habitat conservation and cultural uses.

In addition to these development efforts, we will also pursue strategic investments in complementary business or infrastructure to meet our objectives. We cannot predict with certainty when or if these objectives will be realized.

### Water Resource Development

The Water Project is designed to capture and conserve billions of gallons of renewable native groundwater currently being lost annually to evaporation from the aquifer system underlying our Cadiz/Fenner Property, and provide a reliable water supply to water users in Southern California. By implementing established groundwater management practices, the Water Project will create a new, sustainable water supply for project participants without adversely impacting the aquifer system or the desert environment. The total quantity of groundwater to be recovered and conveyed to Water Project participants will not exceed a long-term annual average of 50,000 acre-feet per year for 50 years. The Water Project also offers participants the ability to carry-over their annual supply and store it in the groundwater basin from year to year. A second phase of the Water Project, Phase II, will offer approximately one million acre-feet of storage capacity that can be used to store imported water supplies at the Water Project area.

Water Project facilities required for Phase I primarily include, among other things:

- High yield wells designed to efficiently recover available native groundwater from beneath the Water Project area;
- A water conveyance pipeline to deliver water from the well field to the CRA; and
- An energy source to provide power to the well-field, pipeline and pumping plant.

If an imported water storage component of the Water Project is ultimately implemented in Phase II, the following additional facilities would be required, among other things:

- A pumping plant to pump water through the conveyance pipeline from the CRA to the Water Project well-field; and
- Spreading basins, which are shallow settling ponds that will be configured to efficiently percolate water from the ground surface down to the water table using subsurface storage capacity for the storage of water.

In general, several elements are needed to implement such a project: (1) a water conveyance pipeline right-of-way from the Water Project area to a delivery system; (2) storage and supply agreements with one or more public water agencies or private water utilities; (3) environmental/regulatory permits; and (4) construction and working capital. As described below, the first three elements have been progressed on a concurrent basis. The fourth is dependent on actions arising from the completion of the first three.

#### (1) A Water Conveyance Pipeline Right-of-Way from the Water Project Area to a Delivery System

In September 2008, we secured a right-of-way for the Water Project’s water conveyance pipeline by entering into a lease agreement with the Arizona & California Railroad Company (“ARZC”), which operates an active shortline railroad extending from Cadiz to Matthie, Arizona. The agreement allows for the use of a portion of the railroad’s right-of-way to construct and operate a water conveyance pipeline for a period up to 99 years. The buried pipeline would be constructed parallel to the railroad tracks and be used to convey water between our Cadiz Valley property and the CRA in Rice, California. The ARZC is also a Project participant and would receive water from the Project to serve a variety of railroad purposes, including fire suppression and other safety and maintenance uses. In addition, in September 2013, we entered into a trackage rights agreement with the ARZC that would enable the operation of steam-powered, passenger excursion trains on the line powered by water made available from the pipeline.

The ARZC pipeline route was fully analyzed in the Water Project’s Final Environmental Impact Report (“FEIR”) as part of the CEQA environmental review process completed in 2012. Pursuant to our lease agreement with ARZC, we made a payment in the amount of $3.3 million in March 2013, marking the completion of the environmental review period and the commencement of the construction and operation term of the agreement.

We are also exploring the potential to utilize an unused natural gas pipeline (as described in “Existing Pipeline Asset” below) that exists in the Project area as a means to access additional distribution systems. Initial feasibility studies indicate that this pipeline could be used as a component of the Project to distribute water to Project participants or import water for storage at the Project area in Phase II. The potential use of this pipeline by the Project was preliminarily analyzed as part of the Project’s Environmental Impact Report (“EIR”). Additional environmental review would be required prior to converting this line for water distribution.

#### (2) Storage and Supply Agreements with One or More Public Water Agencies or Private Water Utilities

In 2010 and 2011, we entered into option and environmental cost sharing agreements with six water providers: Santa Margarita Water District (“SMWD”), Golden State Water Company (a wholly-owned subsidiary of American States Water \[NYSE: AWR\]), Three Valleys Municipal Water District, Suburban Water Systems (a wholly owned subsidiary of SouthWest Water Company), Jurupa Community Services District and California Water Service Company, the third largest investor-owned American water utility. The six water providers serve more than one million customers in cities throughout California’s San Bernardino, Riverside, Los Angeles, Orange, Imperial and Ventura Counties.

Under the terms of the agreements with the six water providers, upon completion of the Water Project’s CEQA review and certification of the Final Environmental Impact Report (“Final EIR”), which occurred on July 31, 2012, each agency has the right to acquire an annual supply of 5,000 acre-feet of water at a pre-determined formula competitive with their incremental cost of new water. In addition, the agencies have options to acquire storage rights in the Water Project to allow them to manage their supplies to complement their other water resources.

Following CEQA certification, SMWD was the first participant to adopt resolutions approving a Water Purchase and Sale Agreement for 5,000 acre-feet of water. The structure of the SMWD purchase agreement calls for an annually adjusted water supply payment of up to $500/AF including identified income streams, plus their pro rata portion of the capital recovery charge and operating and maintenance costs. The capital recovery charge is calculated by amortizing the total capital investment by the Company over a 30-year term.

Approximately 80% of the water to be conserved annually by the Project is now either under a Water Purchase and Sale Agreement or remains under option. We are currently working with other participating agencies to convert their option agreements to definitive economic agreements. We are also in discussions with additional water providers interested in acquiring rights to the remaining available Project supplies, as well as with third parties regarding the imported storage aspect of this Project.

#### (3) Environmental/Regulatory Permits

In order to properly develop and quantify the sustainability of the Water Project, and prior to initiating the formal permitting process for the Water Project, we commissioned environmental consulting firm CH2M HILL to complete a comprehensive study of the water resources at the Project area. Following a year of analysis, CH2M HILL released its study of the aquifer system in February 2010. Utilizing new models produced by the U.S. Geological Survey in 2006 and 2008, the study estimated the total groundwater in storage in the aquifer system to be between 17 and 34 million acre-feet, a quantity on par with Lake Mead, the nation’s largest surface reservoir. The study also identified a renewable annual supply of native groundwater in the aquifer system currently being lost to evaporation. CH2M HILL’s findings, which were peer reviewed by leading groundwater experts, confirmed that the aquifer system could sustainably support the Water Project.

Further, and also prior to beginning the formal environmental permitting process, we entered into a Memorandum of Understanding with the Natural Heritage Institute (“NHI”), a leading global environmental organization committed to protecting aquatic ecosystems, to assist with our efforts to sustainably manage the development of our Cadiz/Fenner property. As part of this “Green Compact”, we will follow stringent plans for groundwater management and habitat conservation, and create a groundwater management plan for the Water Project.

As discussed in (2), above, we have entered into environmental cost-sharing agreements with all participating water providers. The environmental cost-sharing agreements created a framework for funds to be committed by each participant to share in the costs associated with the CEQA review work. SMWD served as the lead agency for the review process. ESA Associates, a leading environmental consulting firm, prepared the Water Project’s environmental review documentation.

The CEQA process began in February 2011 with the issuance of a Notice of Preparation (“NOP”) of a Draft Environmental Impact Report (“Draft EIR”) by SMWD. SMWD held two public scoping meetings in March 2011 and released the Draft EIR in December 2011. The Draft EIR analyzed potential impacts to environmental resources at the Project area, including critical resources of the desert environment such as vegetation, mountain springs, and water and air quality. The analysis of the Project considered peer-reviewed technical reports, independently collected data, existing reports and the Project’s state of the art Groundwater Management, Monitoring and Mitigation Plan (“GMMMP”).

SMWD conducted a 100-day public comment period for the Draft EIR, hosting two public comment meetings and an informational workshop in January and February 2012. The public comment period concluded in March 2012. In May 2012, we entered into a Memorandum of Understanding with San Bernardino County and SMWD, creating the framework for finalizing the GMMMP in accordance with County’s desert groundwater ordinance.

At the beginning of July 2012, SMWD released the Final EIR and responses to public comments. The Final EIR summarized that, with the exception of unavoidable short-term construction emissions, by implementing the measures developed in the GMMMP, the Project will avoid significant impacts to desert resources. A public hearing was held on July 25, 2012 by the SMWD Board of Directors to take public testimony and consider certification of the Final EIR. On July 31, 2012, the SMWD Board of Directors certified the Final EIR.

Following SMWD’s certification of the Final EIR, the San Bernardino County Board of Supervisors voted on October 1, 2012 to approve the GMMMP for the Project and adopted certain findings under CEQA, becoming the first Responsible Agency to take an approving action pursuant to the certified EIR. San Bernardino County served as a Responsible Agency in the CEQA review process as the local government entity responsible for oversight over groundwater resources in the Cadiz Valley.

Metropolitan Water District of Southern California (“Metropolitan”), a Responsible Agency, will take action under CEQA prior to construction regarding the terms and conditions of the Project’s use of the CRA. Project water supplies will enter Metropolitan’s CRA in accordance with its published engineering and design standards and subject to all applicable fees and charges routinely established by Metropolitan for the conveyance of water within its service territory.

Third parties in California have the ability to challenge CEQA approvals in State Court. In 2012, the Company was named as a real-party-in-interest in nine lawsuits challenging the various Water Project approvals granted by SMWD and San Bernardino County. In 2013, three cases were dismissed or otherwise settled. Trial in the six remaining cases, which were brought by two petitioners, began in December 2013 and concluded in February 2014. On May 1, 2014, the trial court issued a ruling in these cases, which denied all six petitions and upheld the environmental review and approvals granted by SMWD and San Bernardino County. See Part II – Other Information, Item 1. Legal Proceedings.

#### (4) Construction and Working Capital

As part of the Water Purchase and Sale Agreement with SMWD referred to in (2), above, SMWD further authorized beginning the Project’s next steps with the Company, including final permitting, design and construction.

As described above, construction of Phase I of the Project would primarily consist of well-field facilities at the Water Project site, a conveyance pipeline extending approximately 43 miles along the right-of-way described in (1), above, from the well-field to the CRA, and an energy source to pump water through the conveyance pipeline between the Project well-field and the CRA. The construction of these facilities will require capital financing, which is expected to be entirely provided with lower-cost senior debt, secured by the new facility assets. The Company’s existing corporate term debt (see “Liquidity and Capital Resources” below) provides us the flexibility to incorporate Water Project construction financing within our current debt structure.

Existing wells at the Cadiz Valley property currently in use for our agricultural operations will be integrated into the Water Project well-field, reducing the number of wells that must be constructed prior to Project implementation.

### Existing Pipeline Asset

In September 2011, we entered into an agreement with El Paso Natural Gas (“EPNG”), a subsidiary of Kinder Morgan Inc., providing us with rights to purchase a 220-mile idle, natural gas pipeline between Bakersfield and Cadiz, California for $40 million.

Initial feasibility studies indicated that upon conversion, the 30-inch line could transport between 20,000 and 30,000 acre-feet of water per year between the Water Project area and various points along the Central and Northern California water transportation network. In February 2012, we made a $1 million payment to EPNG to extend our option to purchase the 220-mile line until April 2013.

In December 2012, we entered into a new agreement with EPNG dividing the 220-mile pipeline in Barstow, California, with the Company gaining ownership rights to the 96-mile eastern segment between Barstow and the Cadiz Valley and returning to EPNG rights to the 124-mile western segment for its own use. The 96-mile eastern portion from the Cadiz Valley to Barstow was identified as the most critical segment of the line for accessing the state’s water transportation infrastructure. The Barstow area serves as a hub for water delivered from northern and central California to communities in Southern California’s High Desert.

In consideration of the new agreement, EPNG reduced the purchase price of the 96-mile eastern segment to $1 (one dollar), plus previous option payments totaling $1.07 million already made by the Company. On April 11, 2014, the Company paid the remaining purchase price of $1 (one dollar) and secured ownership of the asset. In addition, the agreement provides that if EPNG files for regulatory approval of any new use of the 124-mile western segment by December 2015, EPNG will make a payment of $10 million to the Company on the date the application for regulatory approval is filed.

The 96-mile Cadiz-Barstow pipeline creates significant opportunities for our water resource development efforts. Once converted to water use, the pipeline can be used to directly connect the Cadiz area to northern and central California water sources, serving a growing need for additional locations for storage of water south of the Bay Delta region. In addition, the 96-mile pipeline creates new opportunities to deliver water, either directly or via exchange, to potential customers in San Bernardino and Kern Counties, areas which do not currently have an interconnection point with the Project. When both the 96-mile line and the 43-mile pipeline to the CRA become operational, the Cadiz Project would link the two major water delivery systems in California providing flexible opportunities for both supply and storage.

The entire EPNG pipeline was evaluated in the Water Project’s EIR during the CEQA process at a programmatic level. Any use of the line would be conducted in conformity with the Project’s GMMMP and is subject to further CEQA evaluation (see “Water Resource Development” above).

### Agricultural Development

Within the Cadiz/Fenner Property, 9,600 acres have been zoned for agriculture. The infrastructure currently includes seven wells that are interconnected within a portion of this acreage, with total annual production capacity of approximately 13,000 acre-feet of water. Additionally, there are housing and kitchen facilities that support up to 300 employees. If the entire 9,600 acres were developed and irrigated, total water usage would be approximately 40,000 – 50,000 acre-feet per year depending on the crop mix. The underlying groundwater, fertile soil, and desert temperatures are well suited for a wide variety of fruits and vegetables.

Permanent crops currently include 160 acres of vineyard used to produce dried-on-the-vine raisins and approximately 520 acres of lemon orchards. Both of these crops are farmed using sustainable agricultural practices.

We currently derive our agricultural revenues through direct farming and sale of our products into the market or through the lease of our agricultural properties to third parties for farming. The entire organic raisin crop grown at the property is farmed by the Company and we incur all of the costs required to produce and harvest the crop. The harvested raisins are then sold in bulk to a raisin processing facility. Approximately 180 acres of lemons in production are farmed by the Company. We incur all of the costs required to produce this lemon crop. Once harvested, the lemons are shipped in bulk to an independent packing and sales facility.

The remaining 340 acres of lemons are developing crops that are farmed pursuant to lease agreements with two separate parties. We expect to receive a profit share component provided by each of the leases once the new lemon orchards reach commercial production.

Agricultural revenues will continue to vary from year to year based on the number of acres in development, crop yields, and prices. We do not expect that our agricultural revenues will be material to our overall results of operations once the Water Project is fully operational. However, our agricultural operations are expected to be maintained in complement with the Water Project to provide added value to Project operations.

### Additional Eastern Mojave Properties

We also own approximately 11,000 acres outside of the Cadiz/Fenner Valley area in other parts of the Mojave Desert in eastern San Bernardino County.

Our primary landholding outside of the Cadiz area is approximately 9,000 acres in the Piute Valley. This landholding is located approximately 15 miles from the resort community of Laughlin, Nevada, and about 12 miles from the Colorado River town of Needles, California. Extensive hydrological studies, including the drilling and testing of a full-scale production well, have demonstrated that this landholding is underlain by high-quality groundwater. The aquifer system underlying this property is naturally recharged by precipitation (both rain and snow) within a watershed of approximately 975 square miles and could be suitable for a water supply project, agricultural development or solar energy production. Certain of these properties are located in or adjacent to areas designated by the federal government as Critical Desert Tortoise Habitat and/or Desert Wilderness Areas and are suitable candidates for preservation and conservation.

Additionally, we own acreage located near Danby Dry Lake, approximately 30 miles southeast of our Cadiz/Fenner Valley properties. The Danby Dry Lake property is located approximately 10 miles north of the CRA. Initial hydrological studies indicate that the area has excellent potential for a water supply project. Certain of the properties in this area may also be suitable for agricultural development and/or preservation and conservation.

### Land Conservation Bank

As stated above, approximately 10,000 acres of our properties outside of the Cadiz Valley that are not currently being developed are located within areas designated by the federal government as Critical Desert Tortoise Habitat and/or Desert Wilderness Areas. We are currently in the permitting process with the California Department of Fish and Wildlife to permit approximately 7,500 acres of these properties for inclusion in a land conservation bank, which would provide credits that can be acquired by entities that must mitigate or offset planned development in other areas. For example, this bank could potentially service the mitigation requirements of numerous utility-scale solar development projects being considered throughout Riverside and San Bernardino Counties, including projects within the recently approved federal Riverside-East Solar Energy Zone.

### Other Opportunities

Over the longer-term, we believe the population of Southern California, Nevada and Arizona will continue to grow, and that, in time, the economics of commercial and residential development at our properties may become attractive. Moreover, other opportunities in business or infrastructure complementary to our current objectives could provide new opportunities for our business.

We remain committed to the sustainable use of our land and water assets, and will continue to explore all opportunities for environmentally responsible development of these assets. We cannot predict with certainty which of these various opportunities will ultimately be utilized.

### Results of Operations

### Three Months Ended March 31, 2014, Compared to Three Months Ended March 31, 2013

We have not received significant revenues from our water resource and real estate development activity to date. Our revenues have been limited to our agricultural operations. As a result, we have historically incurred a net loss from operations. We had revenues of $4 thousand for each of the three months ended March 31, 2014 and 2013. We incurred a net loss of $4.7 million in the three months ended March 31, 2014, compared with a $7.4 million net loss during the three months ended March 31, 2013. The higher 2013 loss was primarily due to higher general and administrative expenses, higher interest expense and the loss on extinguishment of debt and debt refinancing.

Our primary expenses are our ongoing overhead costs associated with the development of the Water Project (i.e., general and administrative expense) and our interest expense. We will continue to incur non-cash expenses in connection with our management and director equity incentive compensation plans.

***Revenues*** We had revenues of $4 thousand for each of the three months ended March 31, 2014 and 2013.

***Cost of Sales*** Cost of sales were zero for each of the three months ended March 31, 2014 and 2013.

***General and Administrative Expenses*** General and administrative expenses were $2.6 million during the three months ended March 31, 2014, and $3.9 million during the three months ended March 31, 2013. Non-cash compensation costs for stock and option awards are included in General and Administrative Expenses.

General and Administrative Expenses, exclusive of stock-based compensation costs, totaled $2.6 million and $3.4 million for the three months ended March 31, 2014 and 2013, respectively. The decrease in general and administrative expenses in 2014 was primarily related to lower litigation costs related to the Water Project due to the timing of the administrative trial (see “Water Resource Development”, above).

Compensation costs from stock and option awards for the three months ended March 31, 2014, were $30 thousand, compared with $439 thousand for the three months ended March 31, 2013. The higher 2013 expense was primarily due to higher stock-based non-cash compensation costs related to shares awarded to the Brownstein law firm for certain legal and advisory services to the Company.

***Depreciation*** Depreciation expense totaled $64 thousand for each of the three months ended March 31, 2014 and 2013.

***Interest Expense, net*** Net interest expense totaled $2.0 million during the three months ended March 31, 2014, compared to $2.4 million during the same period in 2013. The following table summarizes the components of net interest expense for the two periods (in thousands):

|  | Three Months Ended March 31, 2014 | 2013 |
| --- | ---: | ---: |
| Interest on outstanding debt | $1,838 | $1,126 |
| Amortization of financing costs | 55 | 62 |
| Amortization of debt discount | 152 | 1,249 |
|  | $2,045 | $2,437 |

See Note 2 to the Consolidated Financial Statements – “Long-term Debt”.

***Income Taxes*** Income tax expense for the three months ended March 31, 2014 was $1 thousand compare with $3 thousand for the three months ended March 31, 2013. See Note 4 to the Consolidated Financial Statements - “Income Taxes”.

### Liquidity and Capital Resources

### Current Financing Arrangements

As we have not received significant revenues from our development activities to date, we have been required to obtain financing to bridge the gap between the time water resource and other development expenses are incurred and the time that revenue will commence. Historically, we have addressed these needs primarily through secured debt financing arrangements, private equity placements and the exercise of outstanding stock options and warrants. We have also worked with our secured lenders to structure our debt in a way which allows us to continue development of the Water Project and minimize the dilution of the ownership interests of common stockholders.

In March 2013, we refinanced our term debt. See Note 2 to the Consolidated Financial Statements – “Long Term Debt”. The major components of the refinancing included:

I. A $30 million senior term loan secured by the underlying assets of the Company (the “Senior Secured Debt”) that accrues interest at 8% per annum and requires no principal or interest payments before maturity in March 2016; and

II. $53.5 million in convertible notes (the “Convertible Notes”) that accrues interest at 7% per annum with no principal or interest payments required before maturity in March 2018; and

III. $17.5 million in new working capital provided as part of the Convertible Notes issuance.

We believe that by breaking our debt into two components, we now have the flexibility to incorporate project financing for the Water Project, as necessary, into our current debt structure. While the new $30 million senior term loan would be required to be taken out by any necessary project financing, the $53.5 million of Convertible Notes have been designed to allow project financing to be placed ahead of it in terms of priority. The $17.5 million of new working capital provides us with the resources to continue to move through our pre-construction phase, including resolution of outstanding administrative CEQA litigation, facility engineering and design, and the finalization of water supply purchase agreements with all Water Project participants.

In October 2013, we entered into an agreement (“Credit Agreement”) with our majority senior lender, MSD Credit Opportunity Master Fund, L.P. (“MSD Credit”), to increase the existing $30 million senior secured mortgage loan by $10 million to fund additional working capital. This $10 million tranche accrues interest at 8% per annum and requires no principal or interest payments prior to maturity on June 30, 2017. The $10 million and the original $30 million are both secured by the underlying assets of the Company, including all landholdings and infrastructure. The Credit Agreement also provides that in the case of certain asset sales unrelated to the Water Project, the Company would retain for working capital purposes up to 50% of the first $10 million of sales, with the remainder requiring mandatory prepayment of the Senior Secured Debt. As part of the transaction, we issued 700,000 shares of Cadiz Inc. common stock to MSD Credit subject to certain restrictions on resale.

Both the Senior Secured Debt and the Convertible Notes contain representations, warranties and covenants that are typical for agreements of this type, including restrictions that would limit our ability to incur additional indebtedness, incur liens, pay dividends or make restricted payments, dispose of assets, make investments and merge or consolidate with another person. However, while there are affirmative covenants, there are no financial maintenance covenants and no restrictions on our ability to issue additional common stock to fund future working capital needs. The debt covenants associated with the new loans were negotiated by the parties with a view towards our operating and financial condition as it existed at the time the agreements were executed. At March 31, 2014, we were in compliance with our debt covenants.

As we continue to actively pursue our business strategy, additional financing may continue to be required. See “Outlook”, below. The covenants in the term debt do not prohibit our use of additional equity financing and allow us to retain 100% of the proceeds of any equity financing. We do not expect the loan covenants to materially limit our ability to finance our water development activities.

At March 31, 2014, we had no outstanding credit facilities other than the Senior Secured Debt and the Convertible Notes described above.

**Cash Used for Operating Activities.** Cash used for operating activities totaled $4.4 million and $6.7 million for the three months ended March 31, 2014 and 2013, respectively. The cash was primarily used to fund general and administrative expenses related to our water development efforts and litigation costs for the three month periods ended March 31, 2014 and 2013. Additionally, a $3.3 million cash payment was made in March 2013 related to the lease agreement with the Arizona & California Railroad Company to use a portion of the railroad’s right-of-way to construct and operate a water conveyance pipeline which is reflected in the increase in other assets in the consolidated statement of cash flows.

**Cash Used for Investing Activities.** Cash used for investing activities during the three months ended March 31, 2014 was zero compared with $167 thousand during the same period in 2013.

**Cash (Used for) Provided by Financing Activities.** Cash used for financing activities for the three months ended March 31, 2014 was $3 thousand compared with $16.3 million provided by financing activities during the same period in 2013. The 2013 period included $17.5 million of proceeds as part of the issuance of long-term debt, offset by $1.2 million in debt issuance costs related to the debt refinancing.

### Outlook

***Short-Term Outlook.*** Our existing cash resources of $7.5 million provide us with sufficient funds to meet our expected working capital needs through the end of the first quarter of 2015. Should we require additional working capital to fund operations, we expect to continue our historical practice of structuring our financing arrangements to match the anticipated needs of our development activities. See “Long-Term Outlook”. No assurances can be given, however, as to the availability or terms of any new financing.

***Long-Term Outlook.*** In the longer term, we will need to raise additional capital to finance working capital needs, capital expenditures and any payments due under our Senior Secured Debt or our Convertible Notes at maturity (see “Current Financing Arrangements”, above).

Our future working capital needs will depend upon the specific measures we pursue in the entitlement and development of our water resources and other developments. Future capital expenditures will depend primarily on the progress of the Water Project.

We will evaluate the amount of cash needed, and the manner in which such cash will be raised, on an ongoing basis. We may meet any future cash requirements through a variety of means, including equity or debt placements, or through the sale or other disposition of assets. Equity placements would be undertaken only to the extent necessary, so as to minimize the dilutive effect of any such placements upon our existing stockholders. Limitations on our liquidity and ability to raise capital may adversely affect us. Sufficient liquidity is critical to meet our resource development activities. Although we currently expect our sources of capital to be sufficient to meet our near-term liquidity needs, there can be no assurance that our liquidity requirements will continue to be satisfied. If the Company cannot raise needed funds, it might be forced to make substantial reductions in its operating expenses, which could adversely affect its ability to implement its current business plan.

### Recent Accounting Pronouncements

See Note 1 to the Consolidated Financial Statements – “Description of Business and Summary of Significant Accounting Policies”.

## Market risk

As filed, 200 characters.

As of March 31, 2014, all of the Company's indebtedness bore interest at fixed rates; therefore, the Company is not exposed to market risk from changes in interest rates on long-term debt obligations.

## Controls and procedures

As filed, 1,635 characters.

### Disclosure Controls and Procedures

The Company established disclosure controls and procedures to ensure that material information related to the Company, including its consolidated entities, is accumulated and communicated to senior management, including the Chief Executive Officer (the “Principal Executive Officer”) and Chief Financial Officer (the “Principal Financial Officer”) and to its Board of Directors. Based on their evaluation as of March 31, 2014, the Company's Principal Executive Officer and Principal Financial Officer have concluded that the Company's disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Securities Exchange Act of 1934) are effective to ensure that the information required to be disclosed by the Company in the reports that it files or submits under the Securities Exchange Act of 1934 is recorded, processed, summarized and reported within the time periods specified in Securities and Exchange Commission rules and forms, and such information is accumulated and communicated to management, including the principal executive and principal financial officers as appropriate, to allow timely decisions regarding required disclosures.

### Changes in Internal Controls Over Financial Reporting

In connection with the evaluation required by paragraph (d) of Rule 13a-15 under the Exchange Act, there was no change identified in the Company's internal controls over financial reporting that occurred during the last fiscal quarter that has materially affected, or is reasonably likely to materially affect, the Company's internal controls over financial reporting.

## Risk factors

As filed, 167 characters.

There have been no material changes to the factors disclosed in Item 1A. Risk Factors in the Company's Annual Report on Form 10-K for the year ended December 31, 2013.

Filed May 8, 2014.
Source: SEC EDGAR, the filing index for accession 0000727273-14-000007. Last ingested by Listed: Oct 29, 2026, 16:21 ET. No prices; not investment advice.
