# Cadiz Inc: Form 10-Q for the period ended Jun 30, 2016

- Company: [Cadiz Inc](/companies/cdzi.md) (CIK 727273)
- Form: 10-Q
- Filed: 2016-08-08
- Accepted by EDGAR: Aug 8, 2016, 15:55 ET
- Period: 2016-06-30
- Accession: 0000727273-16-000066
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/727273/000072727316000066/form10q_june2016.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/727273/000072727316000066/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2016-06-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2016-04-01 to 2016-06-30 | $108.0k | us-gaap:Revenues |
| Revenue | 6 months, 2016-01-01 to 2016-06-30 | $183.0k | us-gaap:Revenues |
| Operating income | 3 months, 2016-04-01 to 2016-06-30 | −$2.6m | us-gaap:OperatingIncomeLoss |
| Operating income | 6 months, 2016-01-01 to 2016-06-30 | −$5.0m | us-gaap:OperatingIncomeLoss |
| Income tax | 3 months, 2016-04-01 to 2016-06-30 | $1.0k | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 6 months, 2016-01-01 to 2016-06-30 | $2.0k | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 6 months, 2016-01-01 to 2016-06-30 | −$14.4m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2016-04-01 to 2016-06-30 | −$0.31 | us-gaap:EarningsPerShareBasicAndDiluted |
| Diluted EPS | 6 months, 2016-01-01 to 2016-06-30 | −$0.81 | us-gaap:EarningsPerShareBasicAndDiluted |
| Operating cash flow | 6 months, 2016-01-01 to 2016-06-30 | −$4.8m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Cash and equivalents | at 2016-06-30 | $5.9m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2016-06-30 | $6.3m | us-gaap:AssetsCurrent |
| Total assets | at 2016-06-30 | $58.1m | us-gaap:Assets |
| Current liabilities | at 2016-06-30 | $1.6m | us-gaap:LiabilitiesCurrent |
| Total liabilities | at 2016-06-30 | $124.8m | us-gaap:Liabilities |
| Long-term debt | at 2016-06-30 | $109.3m | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2016-06-30 | $167.0k | us-gaap:LongTermDebtCurrent |
| Shareholders' equity | at 2016-06-30 | −$66.7m | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 51,376 characters.

*In connection with the "safe harbor" provisions of the Private Securities Litigation Reform Act of 1995, the following discussion contains trend analysis and other forward-looking statements. Forward-looking statements can be identified by the use of words such as "intends", "anticipates", "believes", "estimates", "projects", "forecasts", "expects", "plans" and "proposes". Although we believe that the expectations reflected in these forward-looking statements are based on reasonable assumptions, there are a number of risks and uncertainties that could cause actual results to differ materially from these forward-looking statements. These include, among others, our ability to maximize value from our Cadiz, California land and water resources; and our ability to obtain new financings as needed to meet our ongoing working capital needs. See additional discussion under the heading "Risk Factors" in Item 1A of our Annual Report on Form 10-K for the year ended December 31, 2015.*

### Overview

We are a land and water resource development company with 45,000 acres of land in three separate areas of eastern San Bernardino County, California. Virtually all of this land is underlain by high-quality, naturally recharging groundwater resources, and is situated in proximity to the Colorado River and the Colorado River Aqueduct ("CRA"), a major source of imported water for Southern California. Our properties are suitable for various uses, including large-scale agricultural development, groundwater storage and water supply projects. Our main objective is to realize the highest and best use of these land and water resources in an environmentally responsible way.

We believe that the long-term highest and best use of our land and water assets can best be realized through the development of a combination of water supply and storage projects at our properties. Therefore, the Company has been primarily focused on the development of the Cadiz Valley Water Conservation, Recovery and Storage Project (the "Water Project" or "Project"), which will capture and conserve millions of acre-feet1 of native groundwater currently being lost to evaporation from the aquifer system beneath our 34,000-acre property in the Cadiz and Fenner valleys of eastern San Bernardino County (the "Cadiz/Fenner Property"), and deliver it to water providers throughout Southern California (see "Water Resource Development"). We believe that the ultimate implementation of this Water Project will provide a significant source of future cash flow.

The primary factor driving the value of such projects is ongoing pressure on water supplies throughout California and the resulting demand for new, reliable supply solutions that can meet both immediate and long-term water needs. Available supply has most recently been constrained by environmental and regulatory restrictions on each of the State's three main water sources: the State Water Project, which provides water supplies from Northern California to the central and southern parts of the state, the CRA and the Los Angeles Aqueduct. Southern California's water providers rely on imports from these systems for a majority of their water supplies, but deliveries from all three into the region have been below capacity over the last several years.

1 One acre-foot is equal to approximately 326,000 gallons or the volume of water that will cover an area of one acre to a depth of one-foot. An acre-foot is generally considered to be enough water to meet the annual water needs of one average California household.

Availability of supplies in California also differs greatly from year to year due to natural hydrological variability. Over the last several years, California has struggled through an historic drought featuring record-low winter precipitation and reservoir storage levels. In 2015, for the first time in the state's history, California Governor Jerry Brown mandated rationing of 25% statewide in an effort to curtail urban demand. An "El Nino" weather pattern developed at the end of 2015 and brought wet conditions to California, yet snowpack and precipitation remained average for the year, especially in Southern California. According to the US Drought Monitor, while statewide drought conditions have eased, as of July 2016, 100% of California remains abnormally dry. Meteorologists have forecast a dry weather pattern into winter 2016/2017, raising the likelihood of a fifth drought year. The Water Project is one of the few nearly "shovel-ready" supply options in Southern California that could help alleviate the region's water supply challenges (see "Water Resource Development" below).

In addition to an urgent need in California for new, reliable water supplies, demand for agricultural land with water rights is also at an all-time high. Therefore, in addition to our Water Project proposal, we are pursuing ways in which the groundwater currently being lost to evaporation from the aquifer system at the Cadiz/Fenner Property can be immediately put to beneficial use through sales, leasing, or agricultural joint ventures that are complementary to the Water Project.

We have farmed portions of the Cadiz/Fenner Property since the late 1980s relying on groundwater from the aquifer system for irrigation and we believe the site is well suited for various permanent and seasonal crops. In 1993, we secured permits to develop agriculture on up to 9,600 acres of the property and withdraw groundwater from the underlying aquifer system for irrigation. We initially developed 1,900 acres of agriculture at the Property, including a well-field and manifold system, and have since maintained various levels of crops on the Property as we developed the Water Project. Today, there is significant interest in expanding agricultural activity onto the entire 9,600 acres, and in February 2016 we completed arrangements to lease 2,100 acres of the Cadiz/Fenner Property for agricultural development (see "Agricultural Development" below).

As part of the agricultural investments to be conducted under our agricultural lease arrangements, the groundwater production capacity of the property's existing well-field is expected to be enhanced through infrastructure improvements that are complementary to the Water Project. As a result of site work completed in 2015, including the drilling of three additional exploratory wells, we have now identified suitable locations for the drilling of high-production wells that could produce all of the water allowable under our existing permit for implementation of the Water Project or alternatively to supply irrigation water for all of the agricultural land. While any additional well-field development for agricultural use would be financed by our agricultural partners as provided under our agricultural arrangements, the Company retained a call feature that allows us, at any time in the initial 20 years, to acquire the well-field and integrate any new agricultural well-field infrastructure developed into the Water Project's facilities.

Our 2016 working capital requirements relate largely to the final development activities associated with the Water Project and those activities related to further development of our land and agricultural assets consistent with the Water Project. While we continue to believe that the ultimate implementation of the Water Project will provide the primary source of our future cash flow, we also believe there is significant additional value in our underlying agricultural assets.

We also continue to explore additional uses of our land and water resource assets, including the marketing of our approved desert tortoise land conservation bank, which is located on our properties outside the Water Project area, solar-energy development, and other long-term legacy uses of our properties, such as habitat conservation and cultural development.

### Water Resource Development

The Water Project is designed to capture and conserve billions of gallons of renewable native groundwater currently being lost annually to evaporation from the aquifer system underlying our Cadiz/Fenner Property, and provide a reliable water supply to water users in Southern California. By implementing established groundwater management practices, the Water Project will create a new, sustainable water supply for Project participants without adversely impacting the aquifer system or the desert environment. The total quantity of groundwater to be recovered and conveyed to Water Project participants will not exceed a long-term annual average of 50,000 acre-feet per year for 50 years. The Water Project also offers participants the ability to carry-over their annual supply, and store it in the groundwater basin from year to year. A second phase of the Water Project, Phase II, will offer approximately one million acre-feet of underground storage capacity that can be used to hold imported water supplies at the Water Project area.

Water Project facilities required for Phase I primarily include, among other things:

- High yield wells designed to efficiently recover available native groundwater from beneath the Water Project area;
- A water conveyance pipeline to deliver water from the well field to Project participants; and
- An energy source to provide power to the well-field, pipeline and pumping plant.

If an imported water storage component of the Water Project is ultimately implemented in Phase II, the following additional facilities would be required, among other things:

- A pumping plant to pump water through the conveyance pipeline from the CRA to the Water Project well-field; and
- Spreading basins, which are shallow settling ponds that will be configured to efficiently percolate water from the ground surface down to the water table using subsurface storage capacity for the storage of water.

In general, several elements are needed to implement such a project: (1) a water conveyance pipeline right-of-way from the Water Project area to a delivery system; (2) storage and supply agreements with one or more public water agencies or private water utilities; (3) environmental/regulatory permits; and (4) construction and working capital. As described below, the first three elements have been progressed on a concurrent basis. The fourth is dependent on actions arising from the completion of the first three.

#### (1) A Water Conveyance Pipeline Right-of-Way from the Water Project Area to a Delivery System

In September 2008, we secured a right-of-way for the Water Project's water conveyance pipeline by entering into a lease agreement with the Arizona & California Railroad Company ("ARZC"), which operates an active shortline railroad extending from Cadiz to Matthie, Arizona. The agreement allows for the use of a portion of the railroad's right-of-way to construct and operate a water conveyance pipeline for a period of up to 99 years. The buried pipeline would be constructed parallel to the railroad tracks and be used to convey water between our Cadiz/Fenner Property and the CRA in Freda, California.

Our lease agreement with the ARZC also expressly requires that the Project further several railroad purposes and, under the terms of the lease agreement, the ARZC reserved water supplies from the Project for its operational needs as well as access to Project facilities, such as roads and power appurtenances, for the benefit of its railroad operation. In September 2013, we also entered into a trackage rights agreement with the ARZC that would enable the operation of steam-powered, passenger excursion trains on the line powered by water made available from the pipeline.

The pipeline route was fully analyzed in the Water Project's Final Environmental Impact Report ("EIR") as part of the CEQA environmental review process completed in 2012 and was found to be the environmentally preferred route for the pipeline. As an existing transportation corridor, the route avoids sensitive habitats. Our plan to construct the Project pipeline within the railroad right-of-way is similar to, and modeled after, the thousands of other existing longitudinal uses of rail corridors across the United States today, such as telecommunications lines, natural gas and petroleum product lines and other water lines. Under the *General Railroad Right-of-Way Act of March 3, 1875 ("1875 Act")*, according to which many of these railroad corridors were established, a railroad right-of-way can be used for third party uses so long as the use also derives from or furthers railroad purposes, at least in part. This interpretation of the 1875 Act was confirmed by Memorandum Opinion M-37025 issued by the Solicitor of the US Department of the Interior on November 4, 2011 ("2011 M-Opinion").

The Project includes the following features provided in furtherance of railroad purposes:

- A new access road along the entire pipeline route to enable maintenance, emergency access and shorten routes for crew-changes,
- Remotely operated fire-suppression systems at each of the existing creosote-treated wooden trestles,
- Inline power generation for crossing operations and lighting, heating and cooling for existing railroad transloading operations,
- Fiber optic information transmission to convey track-speed and cameras in aid of emergency and to discourage vandalism; and
- The distribution of water for the operation of a steam powered locomotive, fire-suppression and other miscellaneous uses.

In August 2014, the U.S. Bureau of Land Management issued guidance (Instruction Memorandum No. 2014-122) to its field offices requiring the evaluation of ALL existing and proposed uses of 1875 Act railroad rights-of-way to ensure consistency with the M-Opinion. While there are thousands of existing uses of 1875 Act railroad right-of-ways across the US, the Water Project conveyance pipeline was chosen to be the first evaluated by the BLM under the 2011 M-Opinion and Instruction Memorandum No. 2014-122. After numerous meetings, discussion and our submission of support documentation, the Company received notification from the BLM California Office in April 2015 that it was analyzing the Project's proposed use of the ARZC right-of-way and expected to provide the results of this evaluation to the BLM Washington D.C. office by the end of summer 2015.

Without any further consultation, on October 2, 2015, the retiring Director of the California Office of the BLM signed a letter that would later be sent to ARZC and the Company summarizing that the Project pipeline is outside the scope of the ARZC right-of-way and would therefore require a new federal right-of-way permit prior to construction. We believe this guidance disregards the framework established by the 2011 M-Opinion and the IM No. 2014-122, as its underlying premise is that while the Project's proposed use may further railroad purposes, these purposes derive from a pipeline which is not an original railroad purpose. We believe this finding strays from the framework provided for in the binding 2011 M-Opinion, which states in relevant part:

*"Within an 1875 Act ROW, a railroad's authority to undertake or authorize activities is limited to those activities that* ***derive from or further*** *a railroad purpose, which allows a railroad to undertake, or others to undertake, activities that have* ***both railroad and commercial purposes****, but does not permit a railroad to authorize activities that bear no relationship to the construction and operation of a railroad." (Emphasis added, M-37025)*

The retiring Director of the California Office of the BLM noted in his letter that this guidance was not a final agency action and is subject to reconsideration upon the presentation of new information and in the public interest. Therefore, the Company and its partners are presently pursuing a reconsideration of the BLM guidance.

Immediately after the receipt of the October 2015 guidance, the Company sent a letter to the Director of the BLM National Office, Neil Kornze, outlining our objections to its findings and seeking its reconsideration. Several Members of Congress also raised concerns about the guidance and its inconsistencies with existing federal policy governing third party railroad right-of-way use, issuing public statements to the press. In November 2015, a bipartisan group of House Members from California met in person with Director Kornze to further express concern. Then, in December 2015, nine House Members joined in a letter to Director Kornze formally objecting to the BLM California guidance and seeking its reconsideration or reversal.

While the Company has pursued a reconsideration of the October 2015 guidance directly with the administration, numerous United States congressional representatives have also worked to clarify the scope of the congressionally granted 1875 Act right-of-way (ROW) for all who rely on them for necessary infrastructure. Railroad ROWs have been routinely used for fiber optics and communications lines, energy, electricity, water, wastewater, sewer, and natural gas lines in accordance with law and policy encouraging the co-location of utilities within existing transportation corridors.

Earlier this year, 23 bi-partisan members of the U.S. House of Representatives from ten states wrote to the House's Appropriations Subcommittee on Interior, Environment and Related Agencies requesting language be added to the fiscal year 2017 (FY17) Appropriations bill to clarify the scope of railroad ROW grants. Language responsive to this request was included in the FY17 Interior and Environment Appropriations Bill (H.R.5538), an annual funding measure for the Department of the Interior, the Environmental Protection Agency, the US Forest Service, and various related agencies, including the Bureau of Land Management. HR 5538 is expected to be conferenced with the Senate version of the bill sometime this fall.

#### (2) Storage and Supply Agreements with One or More Public Water Agencies or Private Water Utilities

In 2010 and 2011, we entered into option and environmental cost sharing agreements with six water providers: Santa Margarita Water District ("SMWD"), Golden State Water Company (a wholly owned subsidiary of American States Water \[NYSE: AWR\]), Three Valleys Municipal Water District, Suburban Water Systems (a wholly owned subsidiary of SouthWest Water Company), Jurupa Community Services District and California Water Service Company, the third largest investor-owned American water utility. The six water providers serve more than one million customers in cities throughout California's San Bernardino, Riverside, Los Angeles, Orange, Imperial and Ventura Counties.

Following CEQA certification, SMWD was the first participant to convert its option agreement and adopt resolutions approving a Water Purchase and Sale Agreement for 5,000 acre-feet of water. The structure of the SMWD purchase agreement calls for an annually adjusted water supply payment, plus a pro rata portion of the capital recovery charge and operating and maintenance costs. The capital recovery charge is calculated by amortizing the total capital investment by the Company over a 30-year term. Under the terms of the option agreements with the other five water providers named above, each agency has the right to acquire an annual supply of 5,000 acre-feet of water at $775 per acre-foot (2010 dollars), which is competitive with their incremental cost of new water. In addition, these agencies have options to acquire storage rights in the Water Project to allow for the management of their Water Project supplies in complement with their other water resources. Up to 150,000 acre-feet of carry-over storage is available for reservation by the agencies prior to construction commencement. Participants that elect to achieve year-to-year flexibility in their use of Project water by utilizing carry-over storage will reserve storage capacity for $1,500 per AF prior to construction.

In 2014, we also executed Letters of Intent ("LOIs") with two California water providers and two California agricultural entities reserving up to 20,000 acre-feet of water per year from the Water Project at $960/acre-foot (2014 dollars) delivered to the Colorado River Aqueduct. The delivery of Project water to agricultural entities will be subject to an exchange with an eligible State Water Project contractor. The terms of any exchange would be finalized prior to commencement of Project construction.

We have executed LOIs, option agreements and purchase agreements that are in excess of Water Project capacity and are working collaboratively with the participating water providers to account for any oversubscription in the final definitive Purchase and Sale Agreements("PSAs"). Final definitive PSAs would be entered into prior to completing construction finance arrangements.

#### (3) Environmental/Regulatory Permits

In order to properly develop and quantify the sustainability of the Water Project, and prior to initiating the formal permitting process for the Water Project, we commissioned environmental consulting firm CH2M HILL to complete a comprehensive study of the water resources at the Project area. Following a year of analysis, CH2M HILL released its study of the aquifer system in February 2010. Utilizing new models produced by the U.S. Geological Survey in 2006 and 2008, the study estimated the total groundwater in storage in the aquifer system to be between 17 and 34 million acre-feet, a quantity on par with Lake Mead, the nation's largest surface reservoir. The study also identified a renewable annual supply of native groundwater in the aquifer system currently being lost to evaporation. CH2M HILL's findings, which were peer reviewed by leading groundwater experts, confirmed that the aquifer system could sustainably support the Water Project.

Further, and also prior to beginning the formal environmental permitting process, we entered into a Memorandum of Understanding ("MOU") with the Natural Heritage Institute ("NHI"), a leading global environmental organization committed to protecting aquatic ecosystems, to assist with our efforts to sustainably manage the development of our Cadiz/Fenner Property. As part of this "Green Compact", we will follow stringent plans for groundwater management and habitat conservation.

#### CEQA review

As discussed in (2), above, we entered into environmental cost-sharing agreements with all participating water providers creating a framework for funds to be committed by each participant to share in the costs associated with the CEQA review work. SMWD served as the lead agency for the review process, which began in February 2011 with SMWD's issuance of a Notice of Preparation ("NOP") of a Draft Environmental Impact Report ("Draft EIR").

Following two NOP public scoping meetings, SMWD released the Draft EIR in December 2011. The Draft EIR analyzed potential impacts to environmental resources at the Water Project area, including critical resources of the desert environment such as vegetation, mountain springs, and water and air quality. The analysis of the Water Project considered peer-reviewed technical reports, independently collected data, existing reports and the Project's state of the art Groundwater Management, Monitoring and Mitigation Plan ("GMMMP"). SMWD held a 100-day public comment period for the Draft EIR, during which SMWD hosted two public comment meetings and an informational workshop.

In May 2012, SMWD, Cadiz and the County of San Bernardino also entered into a Memorandum of Understanding creating the framework for finalizing the GMMMP in accordance with the County's desert groundwater ordinance.

In July 2012, SMWD released the Final EIR and responses to public comments. The Final EIR summarized that, with the exception of unavoidable short-term construction emissions, by implementing the measures developed in the GMMMP, the Project will avoid significant impacts to desert resources. A public hearing was held on July 25, 2012 by the SMWD Board of Directors to take public testimony and consider certification of the Final EIR. On July 31, 2012, the SMWD Board of Directors certified the Final EIR and approved the Project.

Following SMWD's certification of the Final EIR, the San Bernardino County Board of Supervisors voted on October 1, 2012 to approve the GMMMP for the Project and adopted certain findings under CEQA, becoming the first Responsible Agency to take an approving action pursuant to the certified EIR. San Bernardino County served as a Responsible Agency in the CEQA review process as the local government entity responsible for oversight over groundwater resources in the Cadiz Valley.

#### CEQA Litigation

Third parties in California have the ability to challenge CEQA approvals in State Court and, in 2012, the Company was named as a real-party-in-interest in nine lawsuits challenging the various Water Project approvals granted by SMWD and San Bernardino County. In 2013, three cases were dismissed or otherwise settled. Trial in the six remaining cases, which were brought by two petitioners, began in December 2013 and concluded in February 2014. In September 2014, the Court issued final signed judgments ("Judgments") formally denying all claims brought in the six lawsuits. The Judgments upheld the environmental review and approvals of the Water Project and also awarded costs to SMWD, the County, Cadiz and Fenner Valley Mutual Water Company as the prevailing parties in the cases.

During the fourth quarter of 2014, the petitioners filed independent appeals of the six Judgments in the California Court of Appeals, Fourth District. The Company, SMWD and the County were joined in defense of the Judgements by 11 Amicus Curiae "Friends of the Court" representing a diverse cross section of interests. Oral argument before the Appeals Court was held in late March 2016. In May 2016, a three-judge Appellate judge panel unanimously sustained the six trial court decisions and validated the Project's environmental review and approvals. Thereafter, the Petitioners did not seek any additional judicial review and on July 16, 2016, the opportunity for the California State Supreme Court to independently review the six Appellate Court opinions on its own motion passed. The Project's environmental review and approval stands with no changes and the Project is no longer subject to any CEQA challenges in Court.

#### Metropolitan Water District of Southern California Conveyance Terms

In addition, prior to construction of the Project, the Metropolitan Water District of Southern California ("MWD"), which owns and controls the CRA, must take action as a responsible agency under CEQA regarding the terms and conditions of the Water Project's use of the CRA to transport water to its participating agencies. Water Project supplies entering the CRA will comply with MWD's published engineering, design and water quality standards and will be subject to all applicable fees and charges routinely established by MWD for the conveyance of water within its service territory. Any agreement as to the terms and conditions of the Water Project's use of the CRA will be negotiated between and entered into by MWD and the Project participating agencies, not the Company.

#### (4) Construction and Working Capital

As part of the Water Purchase and Sale Agreement with SMWD, referred to in (2), above, SMWD is further authorized to continue next steps with the Company, which includes final permitting, design and construction.

As described above, construction of Phase I of the Water Project would primarily consist of wellfield facilities at the Project site, a conveyance pipeline extending approximately 43 miles along the right-of-way described in (1), above, from the wellfield to the CRA, and an energy source to pump water through the conveyance pipeline between the Project well-field and the CRA. The construction of these facilities, which we expect would cost between $225 – $250 million, will require capital financing that we expect to be secured by the proceeds of our definitive Purchase and Sale Agreements described above and the new facility assets. Of this amount, approximately $35 million would be necessary for construction of the well-field. The Company's existing corporate term debt provides us the flexibility to incorporate Water Project construction financing up to $300 million within our current debt structure.

### Existing Pipeline Asset

We currently hold ownership rights to a 96-mile existing idle natural gas pipeline from the Cadiz/Fenner Property to Barstow, California that would be converted for the transportation of water.

In September 2011, we entered into an agreement with El Paso Natural Gas ("EPNG"), a subsidiary of Kinder Morgan Inc., providing us with rights to purchase approximately 220-miles of idle, natural gas pipeline between Bakersfield and Cadiz, California for $40 million.

Initial feasibility studies indicated that upon conversion, the 30-inch line could transport between 20,000 and 30,000 acre-feet of water per year between the Water Project area and various points along the Central and Northern California water transportation network. In February 2012, we made a $1 million payment to EPNG to extend our option to purchase the 220-mile line until April 2013.

In December 2012, we entered into a new agreement with EPNG dividing the 220-mile pipeline in Barstow, California, with the Company gaining ownership rights to the 96-mile eastern segment between Barstow and the Cadiz Valley and returning to EPNG rights to the 124-mile western segment for its own use. The 96-mile eastern portion from the Cadiz Valley to Barstow was identified as the most critical segment of the line for accessing the nearest points on the California State Water Project infrastructure system. The Barstow area serves as a hub for water delivered from northern and central California to communities in Southern California's High Desert.

In consideration of the new agreement, EPNG reduced the purchase price of the 96-mile eastern segment to $1 (one dollar), plus previous option payments totaling $1.07 million already made by the Company. On April 11, 2014, the Company paid the remaining purchase price of $1 (one dollar) and secured ownership of the asset. In addition, the agreement provided that if EPNG filed for regulatory approval of any use of the 124-mile western segment by December 2015, a further $10 million payment to the Company would be required, or alternatively, the Company would have a further three-year option to acquire the 124-mile western segment for $20 million. The filing for regulatory approval was not made by December 2015, and accordingly, the Company now holds an option to acquire the 124-mile western segment for $20 million. This option expires in December 2018.

The 96-mile Cadiz Barstow pipeline and the further 124-mile optioned segment (together, the "Northern Pipeline Routes") create significant opportunities for our water resource development efforts. Once converted to water use, the Northern Pipeline Routes can be used to directly connect the Cadiz area to northern and central California water sources, serving a diverse group of urban and agricultural water users in need of supply and storage south of the Bay Delta region.

If the Northern Pipeline Routes become operational, then the Water Project would link the two major water delivery systems in California, providing flexible opportunities for both supply and storage. The Northern Pipeline Routes could deliver Phase I supplies, either directly or via exchange, to existing and potential customers of Phase I of the Project. They could also be used to import water to the Project area and provide additional groundwater storage for the region's water providers south of the Bay Delta region. Such use is currently being contemplated as part of Phase II of the Water Project.

The 96-mile pipeline was evaluated in the Water Project's EIR during the CEQA process. Any use of the line would be conducted in conformity with the Project's GMMMP and is subject to further CEQA evaluation (see "Water Resource Development", above) and potentially federal environmental permitting.

The Northern Pipeline Routes also represent new opportunities for the Company independent of the Water Project to offer water transportation to locations along the pipeline route that are not presently interconnected by existing water infrastructure. The entire 220-mile pipeline crosses California's major water infrastructure as well as urban and agricultural centers and can be utilized to transport water between users who presently lack direct interconnections along the pipeline route. We are presently engaged in discussions with parties that may be interested in such transportation, not related to the Water Project.

### Agricultural Development

Within the Cadiz/Fenner Property, all of the existing 34,000 acres are currently zoned for agriculture. Within this total, 9,600 acres are currently designated under a conditional use permit, of which the Company has developed a total of 1,900 acres of the property for agricultural operations. Additionally, there are housing and kitchen facilities that support up to 300 employees. The underlying groundwater, fertile soil, and desert temperatures are well suited for a wide variety of fruits and vegetables.

During 2015, one hundred and sixty of these acres consisted of vineyard that was farmed by the Company to produce dried-on-the-vine organic raisins. Three hundred and forty of these acres were farmed to lemons under a 2013 lease agreement with Limoneira Company ("Limoneira"), a related party. The remaining acres were fallow. We derived our agricultural revenues through direct farming and sale of our products into the market or through the lease of our agricultural properties to third parties for farming. The entire organic raisin crop grown at the property was farmed by the Company and we incurred all of the costs required to produce and harvest the crop. The harvested raisins were then sold in bulk to a raisin processing facility.

In February 2016, we entered into a lease agreement with Fenner Valley Farms LLC ("FVF"), a subsidiary of Water Asset Management LLC, a related party, pursuant to which FVF will lease, for a 99-year term, 2,100 acres at the Cadiz/Fenner property to be used to plant, grow and harvest agricultural crops ("FVF Lease"). As consideration for the lease, FVF paid the Company a one-time payment of $12,000,000 in February 2016 upon closing. The acreage that was historically farmed by the Company and the acreage that is leased to Limoneira was included within the leased acreage. FVF also assumed the Limoneira lease as part of the transaction. Under the FVF Lease, FVF had a further option to lease up to 7,500 additional acres of the Cadiz/Fenner Property which option expired unexercised on June 30, 2016.

Agricultural expansion will allow us to immediately realize underlying value associated with our land and water assets while we continue to progress Water Project implementation. Additional well-field will be necessary to be constructed byFVF to fully irrigate the agricultural property under the lease. Any new well-field infrastructure will be compatible with the Water Project, once it is implemented. Further, the FVF Lease also provides the Company with a call option, in the initial 20 years, to redirect the beneficial use of groundwater at the Property from agriculture to the Water Project and integrate the agricultural infrastructure into the Water Project facilities.

### Additional Eastern Mojave Properties

We also own approximately 11,000 acres outside of the Cadiz/Fenner Valley area in other parts of the Mojave Desert in eastern San Bernardino County.

Our primary landholding outside of the Cadiz area is approximately 9,000 acres in the Piute Valley. This landholding is located approximately 15 miles from the resort community of Laughlin, Nevada, and about 12 miles from the Colorado River town of Needles, California. Extensive hydrological studies, including the drilling and testing of a full-scale production well, have demonstrated that this landholding is underlain by high-quality groundwater. The aquifer system underlying this property is naturally recharged by precipitation (both rain and snow) within a watershed of approximately 975 square miles and could be suitable for a water supply project, agricultural development or solar energy production. Certain of these properties are located in or adjacent to areas designated by the federal government as Critical Desert Tortoise Habitat and/or Desert Wilderness Areas and are suitable candidates for preservation and conservation.

Additionally, we own acreage located near Danby Dry Lake in Ward Valley, approximately 30 miles southeast of our Cadiz/Fenner Valley properties. The Danby Dry Lake property is located approximately 10 miles north of the CRA. Initial hydrological studies indicate that the area has excellent potential for a water supply project. Certain of the properties in this area may also be suitable for agricultural development and/or preservation and conservation.

### Land Conservation Bank

Approximately 10,000 acres of our properties outside of the Cadiz/Fenner Valley area are located within terrain designated by the federal government as Critical Desert Tortoise Habitat and/or Desert Wilderness Areas and have limited development opportunities. In February 2015, the California Department of Fish and Wildlife approved our establishment of the Fenner Valley Desert Tortoise Conservation Bank ("Fenner Bank"), a land conservation bank that makes available approximately 7,500 acres of our properties located within Critical Desert Tortoise Habitat for mitigation of impacts to tortoise and other sensitive species that would be caused by development in the Southern California desert. Under its enabling documents, the Fenner Bank will offer credits that can be acquired by entities that must mitigate or offset impacts linked to planned development. For example, this bank can service the mitigation requirements of renewable energy, military, residential and commercial development mitigation requirements for projects being considered throughout the desert. Credits sold by the Fenner Bank will fund our permanent preservation of the land as well as research by outside entities, including San Diego Zoo Global, into desert tortoise health and species protection.

### Other Opportunities

Other opportunities in the water and agricultural or related infrastructure business complementary to our current objectives could provide new opportunities for our Company.

Over the longer term, we believe the population of Southern California, Nevada and Arizona will continue to grow, and that, in time, the economics of commercial and residential development at our properties may become attractive.

We remain committed to the sustainable use of our land and water assets, and will continue to explore all opportunities for environmentally responsible development of these assets. We cannot predict with certainty which of these various opportunities will ultimately be utilized.

### Results of Operations

### Three Months Ended June 30, 2016, Compared to Three Months Ended June 30, 2015

We have not received significant revenues from our water resource and real estate development activity to date. Our revenues have been limited to our agricultural operations. As a result, we have historically incurred a net loss from operations. We had revenues of $108 thousand for the three months ended June 30, 2016, and $38 thousand for the three months ended June 30, 2015. We incurred a net loss of $5.6 million in the three months ended June 30, 2016, compared with a $6.0 million net loss during the three months ended June 30, 2015. The lower net loss during the quarter ended June 30, 2016 was a result of a decrease in general and administrative expenses related to lower litigation costs related to the Water Project, offset by an increase in interest expense due to additional convertible debt issuance.

Our primary expenses are our ongoing overhead costs associated with the development of the Water Project (i.e., general and administrative expense) and our interest expense. We will continue to incur non-cash expenses in connection with our management and director equity incentive compensation plans.

***Revenues*** Revenue totaled $108 thousand during the three months ended June, 2016, compared to $38 thousand during the three months ended June 30, 2015. The increase in revenue in 2016 is primarily due to an increase in rental income related to the FVF Lease (see "Agricultural Development", above).

***Cost of Sales*** Cost of sales were zero for each of the three months ended June 30, 2016 and 2015.

***General and Administrative Expenses*** General and administrative expenses, exclusive of stock-based compensation costs, totaled $2.0 million and $3.5 million for the three months ended June 30, 2016 and 2015, respectively. The decrease in general and administrative expenses in 2016 was primarily related to lower litigation costs related to the Water Project due to the timing of the appellate litigation (see "Water Resource Development – (3) Environmental/Regulatory Permits", above).

Compensation costs from stock and option awards for the three months ended June 30, 2016, were $593 thousand, compared with $250 thousand for the three months ended June 30, 2015. The higher 2016 expense was primarily due to higher stock-based non-cash compensation costs related to shares awarded to the Brownstein law firm for certain legal and advisory services to the Company. See Note 3 to the Consolidated Financial Statements – "Common Stock".

***Depreciation*** Depreciation expense totaled $73 thousand for the three months ended June 30, 2016 and $65 thousand for the three months ended June 30, 2015.

***Interest Expense, net*** Net interest expense totaled $3.0 million during the three months ended June 30, 2016 compared to $2.2 million during the same period in 2015. The following table summarizes the components of net interest expense for the two periods (in thousands):

|  | Three Months Ended June 30, 2016 | 2015 |
| --- | ---: | ---: |
| Interest on outstanding debt | $2,413 | $2,011 |
| Amortization of debt discount | 562 | 168 |
| Amortization of deferred loan costs | 63 | 59 |
|  | $3,038 | $2,238 |

See Note 2 to the Consolidated Financial Statements – "Long-term Debt".

***Income Taxes*** Income tax expense was $1 thousand for each of the three months ended June 30, 2016 and 2015. See Note 5 to the Consolidated Financial Statements – "Income Taxes".

### Six Months Ended June 30, 2016, Compared to Six Months Ended June 30, 2015

We had revenues of $183 thousand for the six months ended June 30, 2016, compared with $56 thousand in revenues during the six months ended June 30, 2015. We incurred a net loss of $14.4 million in the six months ended June 30, 2016, compared with a $10.8 million net loss during the six months ended June 30, 2015. The higher year to date loss in 2016 was primarily related to a $2.25 million loss on the extinguishment of debt. The higher 2016 loss was also related to higher interest expense on additional convertible debt issued and higher amortization expense, offset by a decrease in litigation costs related to the Water Project due to the timing of the appellate litigation.

***Revenues*** We had revenues of $183 thousand during the six months ended June 30, 2016, and $56 thousand during the six months ended June 30, 2015. The increase in revenue in 2016 is primarily due to an increase in rental income related to the FVF Lease (see "Agricultural Development", above).

***Cost of Sales*** Cost of sales was zero for each of the six months ended June 30, 2016 and 2015.

***General and Administrative Expenses*** General and administrative expenses, exclusive of stock-based compensation costs, totaled $4.2 million and $5.9 million during the six months ended June 30, 2016 and 2015, respectively. The decrease in general and administrative expenses in 2016 was primarily related to lower litigation costs related to the Water Project due to the timing of the appellate litigation (see "Water Resource Development- (3) Environmental/Regulatory Permits", above).

Compensation costs from stock and option awards for the six months ended June 30, 2016, totaled $759 thousand compared with $510 thousand for the six months ended June 30, 2015. The higher 2016 expense was primarily due to higher stock-based non-cash compensation costs related to shares awarded to the Brownstein law firm for certain legal and advisory services to the Company. See Note 3 to the Consolidated Financial Statements – "Common Stock".

***Depreciation*** Depreciation expense totaled $146 thousand for the six months ended June 30, 2016, and $126 thousand for the six months ended June 30, 2015.

***Interest Expense, net*** Net interest expense totaled $7.2 million during the six months ended June 30, 2016, compared to $4.4 million during the same period in 2015. The following table summarizes the components of net interest expense for the two periods (in thousands):

|  | Six Months Ended June 30, 2016 | 2015 |
| --- | ---: | ---: |
| Interest on outstanding debt | $4,655 | $3,982 |
| Amortization of debt discount | 2,454 | 332 |
| Amortization of financing costs | 120 | 117 |
|  | $7,229 | $4,431 |

See Note 2 to the Consolidated Financial Statement, "Long-Term Debt".

***Other Income, net*** Net other income for the six months ended June 30, 2016, was zero and $70 thousand for the six months ended June 30, 2015. The amount recorded in 2015 is in connection with a lease modification fee related to the amended lease agreement with Limoneira Company.

***Income Taxes*** Income tax expense was $2 thousand for each of the six months ended June 30, 2016 and 2015. See Note 5 to the Consolidated Financial Statements – "Income Taxes".

### Liquidity and Capital Resources

### Current Financing Arrangements

As we have not received significant revenues from our development activities to date, we have been required to obtain financing to bridge the gap between the time water resource and other development expenses are incurred and the time that revenue will commence. Historically, we have addressed these needs primarily through secured debt financing arrangements, private equity placements and the exercise of outstanding stock options and warrants. We have also worked with our secured lenders to structure our debt in a way which allows us to continue development of the Water Project and minimize the dilution of the ownership interests of common stockholders.

Limitations on our liquidity and ability to raise capital may adversely affect us. Sufficient liquidity is critical to meet our resource development activities. After consideration of the Convertible Note Financing in April 2016, we currently expect our sources of capital to be sufficient to meet our liquidity needs through February 2017. To meet our cash needs beyond February 2017, we plan to increase liquidity through a variety of means, including equity or debt placements, through the lease, sale or other disposition of assets or reductions in operating costs. Equity placements, if made, would be undertaken only to the extent necessary, so as to minimize the dilutive effect of any such placements upon our existing stockholders.

As we continue to actively pursue our business strategy, additional financing may continue to be required. See "Outlook" below. The covenants in the term debt do not prohibit our use of additional equity financing and allow us to retain 100% of the proceeds of any equity financing. We do not expect the loan covenants to materially limit our ability to finance our water development activities.

At June 30, 2016, we were in compliance with our debt covenants and had no outstanding credit facilities other than the Senior Secured Debt and the convertible notes.

**Cash Used for Operating Activities.** Cash used for operating activities totaled $4.8 million and $5.3 million for the six months ended June 30, 2016 and 2015, respectively. The cash was primarily used to fund general and administrative expenses related to our water development efforts and litigation costs for the six month periods ended June 30, 2016 and 2015.

**Cash Used for Investing Activities.** Cash used for investing activities during the six months ended June 30, 2016 was zero compared with $240 thousand during the same period in 2015.

**Cash Provided By (Used for) Financing Activities.** Cash provided by financing activities for the six month period ended June 30, 2016 was $8.0 million compared to $12 thousand in cash used for the six months ended June 30, 2015. The 2016 results include a payment of approximately $11.5 million related to the FVF Lease (see Agricultural Development, above) and $7.6 million in net proceeds related to the Convertible Note Financing, offset by $100 thousand in recorded debt issuance costs and a principal payment on the Senior Secured Debt of approximately $11.0 million.

### Outlook

***Short-Term Outlook.*** Our cash resources of $5.9 million as of June 30, 2016, provide us with sufficient funds to meet our expected working capital needs through February 2017. Should we require additional working capital to fund operations, we expect to continue our historical practice of structuring our financing arrangements to match the anticipated needs of our development activities. See "Long-Term Outlook". No assurances can be given, however, as to the availability or terms of any new financing.

***Long-Term Outlook.*** In the longer term, we will need to raise additional capital to finance working capital needs, capital expenditures and any payments due under our Senior Secured Debt or our convertible notes at maturity (see "Current Financing Arrangements", above). Our future working capital needs will depend upon the specific measures we pursue in the entitlement and development of our water resources and other developments. Future capital expenditures will depend primarily on the progress of the Water Project.

We are evaluating the amount of cash needed, and the manner in which such cash will be raised, on an ongoing basis. We plan to meet any future cash requirements through a variety of means, including equity or debt placements, or through the sale or other disposition of assets or reductions in operating costs. Equity placements may be made using our existing shelf registration. Equity placements, if made, would be undertaken only to the extent necessary, so as to minimize the dilutive effect of any such placements upon our existing stockholders. While the Company expects to continue to raise working capital consistent with its past practices, there can be no assurance that the Company will be able to raise sufficient funds in the capital markets or through the sale or disposition of assets which raises substantial doubt about the Company's ability to continue as a going concern.

### Recent Accounting Pronouncements

See Note 1 to the Consolidated Financial Statements – "Description of Business and Summary of Significant Accounting Policies".

## Market risk

As filed, 199 characters.

As of June 30, 2016, all of the Company's indebtedness bore interest at fixed rates; therefore, the Company is not exposed to market risk from changes in interest rates on long-term debt obligations.

## Controls and procedures

As filed, 1,634 characters.

### Disclosure Controls and Procedures

The Company established disclosure controls and procedures to ensure that material information related to the Company, including its consolidated entities, is accumulated and communicated to senior management, including the Chief Executive Officer (the "Principal Executive Officer") and Chief Financial Officer (the "Principal Financial Officer") and to its Board of Directors. Based on their evaluation as of June 30, 2016, the Company's Principal Executive Officer and Principal Financial Officer have concluded that the Company's disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Securities Exchange Act of 1934) are effective to ensure that the information required to be disclosed by the Company in the reports that it files or submits under the Securities Exchange Act of 1934 is recorded, processed, summarized and reported within the time periods specified in Securities and Exchange Commission rules and forms, and such information is accumulated and communicated to management, including the principal executive and principal financial officers as appropriate, to allow timely decisions regarding required disclosures.

### Changes in Internal Controls Over Financial Reporting

In connection with the evaluation required by paragraph (d) of Rule 13a-15 under the Exchange Act, there was no change identified in the Company's internal controls over financial reporting that occurred during the last fiscal quarter that has materially affected, or is reasonably likely to materially affect, the Company's internal controls over financial reporting.

Filed Aug 8, 2016.
Source: SEC EDGAR, the filing index for accession 0000727273-16-000066. Last ingested by Listed: Oct 29, 2026, 16:21 ET. No prices; not investment advice.