# Cadiz Inc: Form 10-Q for the period ended Mar 31, 2017

- Company: [Cadiz Inc](/companies/cdzi.md) (CIK 727273)
- Form: 10-Q
- Filed: 2017-05-09
- Accepted by EDGAR: May 9, 2017, 16:57 ET
- Period: 2017-03-31
- Accession: 0000727273-17-000012
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/727273/000072727317000012/form10q_mar17.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/727273/000072727317000012/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2017-03-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2017-01-01 to 2017-03-31 | $108.0k | us-gaap:Revenues |
| Operating income | 3 months, 2017-01-01 to 2017-03-31 | −$4.1m | us-gaap:OperatingIncomeLoss |
| Income tax | 3 months, 2017-01-01 to 2017-03-31 | $1.0k | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2017-01-01 to 2017-03-31 | −$7.2m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2017-01-01 to 2017-03-31 | −$0.33 | us-gaap:EarningsPerShareBasicAndDiluted |
| Diluted shares (weighted) | 3 months, 2017-01-01 to 2017-03-31 | 22,097,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months, 2017-01-01 to 2017-03-31 | −$2.6m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 3 months, 2017-01-01 to 2017-03-31 | $116.0k | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Cash and equivalents | at 2017-03-31 | $9.4m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2017-03-31 | $10.2m | us-gaap:AssetsCurrent |
| Total assets | at 2017-03-31 | $62.0m | us-gaap:Assets |
| Current liabilities | at 2017-03-31 | $3.1m | us-gaap:LiabilitiesCurrent |
| Total liabilities | at 2017-03-31 | $119.7m | us-gaap:Liabilities |
| Long-term debt | at 2017-03-31 | $101.8m | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2017-03-31 | $1.5m | us-gaap:LongTermDebtCurrent |
| Shareholders' equity | at 2017-03-31 | −$57.7m | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 42,361 characters.

*In connection with the "safe harbor" provisions of the Private Securities Litigation Reform Act of 1995, the following discussion contains trend analysis and other forward-looking statements. Forward-looking statements can be identified by the use of words such as "intends", "anticipates", "believes", "estimates", "projects", "forecasts", "expects", "plans" and "proposes". Although we believe that the expectations reflected in these forward-looking statements are based on reasonable assumptions, there are a number of risks and uncertainties that could cause actual results to differ materially from these forward-looking statements. These include, among others, our ability to maximize value from our land and water resources; and our ability to obtain new financings as needed to meet our ongoing working capital needs. See additional discussion under the heading "Risk Factors" in Item 1A of our Annual Report on Form 10-K for the year ended December 31, 2016.*

### Overview

We are a land and water resource development company with 45,000 acres of land in three areas of eastern San Bernardino County, California. Virtually all of this land is underlain by high-quality, naturally recharging groundwater resources, and is situated in proximity to the Colorado River and the Colorado River Aqueduct ("CRA"), California's primary mode of water transportation for imports from the Colorado River into the State. Our properties are suitable for various uses, including large-scale agricultural development, groundwater storage and water supply projects. Our main objective is to realize the highest and best use of these land and water resources in an environmentally responsible way.

We believe that the long-term highest and best use of our land and water assets can best be realized through the development of a combination of water supply and storage projects at our properties. Therefore, the Company has been primarily focused on the development of the Cadiz Valley Water Conservation, Recovery and Storage Project ("Water Project" or "Project"), which will capture and conserve millions of acre-feet1 of native groundwater currently being lost to evaporation from the aquifer system beneath our 34,000-acre property in the Cadiz and Fenner valleys of eastern San Bernardino County (the "Cadiz/Fenner Property"), and deliver it to water providers throughout Southern California (see "Water Resource Development"). A second phase of the Water Project would offer storage of up to one million acre-feet of imported water in the aquifer system. We believe that the ultimate implementation of this Water Project will provide a significant source of future cash flow.

The primary factor driving the value of such projects is ongoing pressure on California's traditional water supplies and the resulting demand for new, reliable supply solutions that can meet both immediate and long-term water needs. Available supply is constrained by environmental and regulatory restrictions on each of the State's three main water sources: the CRA, the State Water Project, which provides water supplies from Northern California to the central and southern parts of the state, and the Los Angeles Aqueduct, which delivers water from the eastern Sierra Nevada mountains to Los Angeles. Southern California's water providers rely on imports from these systems for a majority of their water supplies, but deliveries from all three into the region have been below capacity over the last several years, even in wet years.

1 One acre-foot is equal to approximately 326,000 gallons or the volume of water that will cover an area of one acre to a depth of one-foot. An acre-foot is generally considered to be enough water to meet the annual water needs of one average California household.

Availability of supplies in California also differs greatly from year to year due to natural hydrological variability. Over the last several years, California has struggled through an historic drought featuring record-low winter precipitation and reservoir storage levels. However, following a series of strong storms through the 2016-2017 winter, California has received record amounts of rain and snow, reducing drought conditions in California. The rapid swing from drought to an extremely wet year has challenged California's traditional infrastructure system, and deliveries into Southern California from the State Water Project, CRA, and Los Angeles Aqueduct, though larger than in past drought years, remain below capacity.

The Water Project is a local supply option in Southern California that could help address the region's water supply challenges by providing new reliable supply and local groundwater storage opportunities (see "Water Resource Development" below) in both dry and wet years. The Project has received permits in accordance with the California Environmental Quality Act ("CEQA") which allow the capture and conservation of 2.5 million acre-feet of groundwater over 50 years under the terms of a groundwater management plan approved by San Bernardino County, which is responsible for groundwater use at the Project area.

Our current working capital requirements relate largely to the final development activities associated with the Water Project and those activities consistent with the Water Project related to further development of our land and agricultural assets. While we continue to believe that the ultimate implementation of the Water Project will provide the primary source of our future cash flow, we also believe there is significant additional value in our underlying agricultural assets. Demand for agricultural land with water rights is at an all-time high; therefore, in addition to our Water Project proposal, we are engaged in agricultural joint ventures at the Cadiz/Fenner Property that put some of the groundwater currently being lost to evaporation from the underlying aquifer system to immediate beneficial use. We have farmed portions of the Cadiz/Fenner Property since the late 1980s relying on groundwater from the aquifer system for irrigation and have found the site is well suited for various permanent and seasonal crops. Presently, the property has 2,100 acres leased for cultivation of a variety of crops, including citrus, dried-on-the-vine raisins and seasonal vegetables.

We also continue to explore additional uses of our land and water resource assets, including renewable energy development, the marketing of our approved desert tortoise land conservation bank, which is located on our properties outside the Water Project area, and other long-term legacy uses of our properties, such as habitat conservation and cultural development.

### Water Resource Development

The Water Project is designed to supply, capture and conserve billions of gallons of renewable native groundwater currently being lost annually to evaporation from the aquifer system underlying our Cadiz/Fenner Property, and provide a new reliable water supply for approximately 400,000 people in Southern California. The total quantity of groundwater to be recovered and conveyed to Water Project participants will not exceed a long-term annual average of 50,000 acre-feet per year for 50 years. The Water Project also offers participants the ability to carry-over their annual supply and store it in the groundwater basin from year to year. A second phase of the Water Project, Phase II, will offer up to one million acre-feet of storage capacity that can be used to hold imported water supplies at the Water Project area.

Water Project facilities required for Phase I primarily include, among other things:

- High-yield wells designed to efficiently recover available native groundwater from beneath the Water Project area;
- A water conveyance pipeline to deliver water from the well-field to the CRA for further delivery to Project participants; and
- An energy source to provide power to the well-field, pipeline and pumping facilities.

If an imported water storage component of the Project is ultimately implemented in Phase II, the following additional facilities would be required, among other things:

- Facilities to pump water through the conveyance pipeline from the CRA to the Water Project well-field and/or through the Company's pipeline from Cadiz to Barstow, CA; and
- Spreading basins, which are shallow settling ponds that will be configured to efficiently percolate water from the ground surface down to the water table using subsurface storage capacity for the storage of water.

Phase I has been fully reviewed and permitted in accordance with the California Environmental Quality Act (CEQA). In May 2016, all permits and approvals were sustained in the California Court of Appeal and are no longer subject to further litigation. As a result, the Project presently is permitted to provide an average of 50,000 acre-feet of water for 50 years to meet municipal and industrial (M&I) water needs in Southern California. Prior to construction, the Water Project must (1) complete efforts to secure its pipeline right-of-way, (2) finalize contracts with Project participating agencies and secure transportation arrangements to deliver water into each participant's service area, and (3) secure private construction financing. Below is a discussion of present activities to advance these objectives.

#### (1) Water Conveyance Pipeline Right-of-Way

#### Pipeline from Cadiz to CRA

In September 2008, we secured a right-of-way for the Water Project's water conveyance pipeline by entering into a lease agreement with the Arizona & California Railroad Company ("ARZC"), which operated an active shortline railroad extending from Cadiz to Matthie, Arizona. The agreement allows for the use of a portion of the railroad's right-of-way to construct and operate a water conveyance pipeline for a period up to 99 years. The buried pipeline would be constructed parallel to the railroad tracks and be used to convey water between our Cadiz Valley property and the CRA in Freda, California.

Our lease agreement with the ARZC also expressly requires that the Project further several railroad purposes and, under the terms of the lease agreement, the ARZC reserved water supplies from the Project for its operational needs as well as access to Project facilities, such as roads and power appurtenances, for the benefit of its railroad operation. In September 2013, we also entered into a trackage rights agreement with the ARZC that would enable the operation of steam-powered, passenger excursion trains on the line powered by water made available from the pipeline.

The pipeline route was fully analyzed in the Water Project's Final Environmental Impact Report ("EIR") as part of the CEQA environmental review process completed in 2012. As an existing transportation corridor, the route, which avoids sensitive habitats, was found to be the environmentally preferred route for the pipeline. In 2009, the federal government stated that no federal environmental review of the pipeline route was required under the National Environmental Policy Act ("NEPA"), because the pipeline was within the scope of the ARZC's right-of-way grant.

Our plan to construct the Project pipeline within the railroad right-of-way is similar to, and modeled after, the thousands of other existing longitudinal uses of rail corridors across the United States today, such as telecommunications lines, natural gas and petroleum product lines and other water lines. Under the *General Railroad Right-of-Way Act of March 3, 1875 ("1875 Act")*, according to which many of these railroad corridors were established, a railroad can lease its property for third party uses without additional permitting of the federal government so long as the use also derives from or furthers railroad purposes, at least in part. This interpretation of the 1875 Act was confirmed by Memorandum Opinion M-37025 issued by the Solicitor of the US Department of the Interior on November 4, 2011 ("2011 M-Opinion"), which state in relevant part:

"Within an 1875 Act ROW, a railroad's authority to undertake or authorize activities is limited to those activities that ***derive from or further*** a railroad purpose, which allows a railroad to undertake, or others to undertake, activities that have ***both railroad and commercial purposes***, but does not permit a railroad to authorize activities that bear no relationship to the construction and operation of a railroad." (Emphasis added, M-37025)

The Project includes the following features, enabled by the conveyance pipeline, provided in furtherance of railroad purposes:

- A new access road along the entire pipeline route to enable maintenance, emergency access and shorten routes for crew-changes,
- Remotely operated fire-suppression systems at each of the existing creosote-treated wooden trestles,
- Inline power generation for crossing operations and lighting, heating and cooling for existing railroad transloading operations,
- Fiber optic information transmission to convey track-speed and cameras in aid of emergency and to discourage vandalism; and
- The distribution of water for the operation of a steam powered locomotive, fire-suppression and other miscellaneous uses.

In response to inquiries from the BLM beginning in 2012 about these purposes, the Company, the ARZC and Water Project participants had numerous meetings with the BLM and provided several documents for background about the railroad purposes that would be furthered by the Project over several years from 2012 - 2015. In the intervening time, the BLM also issued policy memoranda to its field offices, specifically Instruction Memorandum No. 2014-122 and Instruction Memorandum No. 2012-038 (IMs), which together established a framework for evaluation of third party use of 1875 Act railroad ROWs over federal lands. These IMs were to abide by the 2011 Solicitor Opinion but created criteria for every existing and proposed third party use of a railroad right-of-way over federal lands to be evaluated by a BLM field office. In 2014, the BLM estimated that thousands of miles of railroad corridors and more than 3500 existing uses could be subject to new evaluation by the BLM in accordance with the IMs. The Cadiz Water Project's proposed use of the ARZC right-of-way was the first evaluation conducted in accordance with these IMs.

On October 2, 2015, the Director of the California Office of the BLM signed a letter that would later be sent to ARZC and the Company summarizing that the Project pipeline is outside the scope of the ARZC right-of-way, because a water pipeline would not primarily further a railroad purpose or originate from a railroad purpose, and would therefore require a new federal right-of-way permit prior to construction. We believe BLM California's October 2015 guidance evaluation of the Project pipeline ("2015 BLM Evaluation") disregards federal law and policy and strays from the framework provided for in the binding 2011 M-Opinion, and therefore we immediately pursued steps to rescind the October determination.

Several Members of Congress raised concerns about the 2015 BLM Evaluation and its inconsistencies with law and policy related to third party railroad right-of-way use. As a result of inquiries from Congress, BLM California's State Director met with the Company, the ARZC and Project participants in March 2016. However, BLM representatives at the meeting were not prepared to discuss the framework utilized to evaluate the Water Project's proposed use of the ARZC right-of-way.

Following the production of documents in June 2016 produced via a Freedom of Information Act request regarding BLM's evaluation of the Project's use of the railroad right-of-way, we have had no further formal consultation with BLM California. The 2015 BLM Evaluation is under investigation by the House of Representatives Oversight & Government Reform Committee and the Interior Department Inspector General.

Meanwhile, numerous United States congressional representatives from both parties have worked to clarify the scope of the congressionally granted 1875 Act right-of-way (ROW) for all who rely on them for necessary infrastructure, including, for example, fiber optics and communications lines, energy, electricity, water, wastewater, sewer, and natural gas lines.

Following the change in presidential administration in January 2017, a bipartisan group of congressional representatives from several Western States sent a letter in March 2017 to the new Secretary of the Interior Department, Ryan Zinke, to request that the agency (1) rescind the previous administration's IMs, (2) withdraw the 2015 BLM Evaluation and (3) issue a finding that the Project is consistent with the scope of the original right-of-way grant by Congress under the 1875 Act. On March 29, 2017, the BLM issued a new Instruction Memorandum, IM No. 2017-060, to all field offices that rescinded the previous administration's IMs. BLM also moved all consideration of third party use of railroad ROWs over federal lands from its field offices to the Washington DC office. The Company has had no contact yet with the BLM regarding the bipartisan Congressional request related to the 2015 BLM Evaluation.

In addition, in 2016, a bipartisan group of congressional representatives from several Western States sought legislative language to clarify the scope of railroad ROW over federal lands as part of the fiscal year 2017 (FY17) House Interior and Environment Appropriations Bill (H.R.5538), an annual funding measure for the Department of the Interior ("Interior Department"), the Environmental Protection Agency, the US Forest Service, and various related agencies. HR 5538 passed the full House of Representatives in July 2016 inclusive of the requested railroad ROW language ("House-passed Language"). We believe that if signed into law, the House-passed Language would enable third parties, including the Company, to carry-on existing and future activities within existing railroad ROWs over federal lands without the need to secure a separate ROW grant from BLM. Consideration of FY17 appropriations bills, including HR 5538, were delayed in 2016 as a result of the presidential election and were continued until April 2017. On May 5, 2017, the President signed the Consolidated Appropriations Act, 2017 (H.R.244) that included funding priorities of HR 5538. However, all language regarding the use of railroad ROWs over federal lands was removed from H.R.244, including the House-passed Language and a Senate provision authored by Senator Dianne Feinstein (D-CA), which had been included in the annual federal appropriations bill since 2009 and sought to require the Interior Department to certify that the Project's proposed use of the ARZC ROW was within the ROW's scope, but also precluded the BLM from spending any federal dollars on any permitting evaluation of the Water Project's use of that ROW ("Feinstein rider"). In the absence of both the House-passed Language and the Feinstein rider, the Interior Department remains the agency of jurisdiction for determining the scope of the ARZC ROW for our proposed use, as well as the use of all railroad rights-of-way over federal lands, but it is no longer constrained by the Feinstein rider.

#### Northern Pipeline

We currently own a 96-mile existing idle natural gas pipeline from the Cadiz/Fenner Property to Barstow, California that we intend to convert for the transportation of water. The Barstow area serves as a hub for water delivered from northern and central California to communities in Southern California's High Desert. In addition, the Company holds an option to purchase a further 124-mile segment of this pipeline from Barstow to Wheeler Ridge, California for $20 million. This option expires in December 2018.

Initial feasibility studies indicated that, upon conversion, the 30-inch line could transport between 20,000 and 30,000 acre-feet of water per year between the Water Project area and various points along the Central and Northern California water transportation network. As a result, this line could create significant opportunities for our water resource development efforts.

If this pipeline were to become operational, then the Water Project would link two major water delivery systems in California, providing flexible opportunities for both supply and storage. The Northern Pipeline could deliver Phase I supplies, either directly or via exchange, to existing and potential customers of Phase I of the Project. It could also be used to import water to the Project area and provide additional groundwater storage for the region's water providers. Such use is currently being contemplated as part of Phase II of the Water Project.

The 96-mile pipeline segment was evaluated in the Water Project's EIR during the CEQA process. Any use of the pipeline would be conducted in conformity with the Project's GMMMP and is subject to further CEQA evaluation and potentially federal environmental permitting.

The Northern Pipeline also represents new opportunities for the Company independent of the Water Project to offer water transportation to locations along the pipeline route that are not presently interconnected by existing water infrastructure. The entire 220-mile pipeline crosses California's major water infrastructure as well as urban and agricultural centers and can be utilized to transport water, independent of the Water Project, between users who presently lack direct interconnections along the pipeline route. We are presently engaged in discussions with parties that may be interested in such transportation.

#### (2) Agreements with Public Water Agencies or Private Water Utilities & Conveyance Arrangements

The Company has executed Letters of Intent, option agreements and purchase agreements (collectively, "Agreements") with public water agencies and private water utilities in California during the Project's development. These participating agencies serve more than one million customers in cities throughout California's San Bernardino, Riverside, Los Angeles, Orange, Imperial and Ventura Counties.

Santa Margarita Water District ("SMWD") was the first participant to convert its option agreement and adopt resolutions approving a Water Purchase and Sale Agreement for 5,000 acre-feet of water. The structure of the SMWD purchase agreement calls for an annually adjusted water supply payment, plus a pro rata portion of the capital recovery charge and operating and maintenance costs. The capital recovery charge is calculated by amortizing the total capital investment by the Company over a 30-year term.

Agreements entered into prior to the beginning of the CEQA review process provide the right to acquire an annual supply of 5,000 acre-feet of water at a $775 per acre-foot (2010 dollars, subject to adjustment), which is competitive with the incremental cost of new water. In addition, these agencies have options to acquire storage rights in the Water Project to allow for the management of their Water Project supplies in complement with their own water resources. Up to 150,000 acre-feet of carry-over storage is available for reservation by the agencies prior to construction commencement. Participants that elect to achieve year-to-year flexibility in their use of Project water by utilizing carry-over storage will reserve storage capacity for $1,500 per acre-foot prior to construction.

Letters of Intent ("LOIs") that have been entered into since completion of the CEQA review process reserve supplies from the Water Project at $960 per acre-foot (2014 dollars, subject to adjustment). These LOIs also include the option to reserve carry-over storage capacity for $1,500 per acre-foot prior to construction.

Presently, total reservations of supplies from the Water Project via these Agreements are in excess of Water Project capacity and we are working collaboratively with the participating water agencies to account for any oversubscription in the final definitive Purchase and Sale Agreements we enter into with these agencies.

In addition, prior to construction of the Water Project, terms for moving water supplies in the CRA must be negotiated with Metropolitan Water District of Southern California ("Metropolitan"), which owns and controls the CRA. Water Project supplies entering the CRA will comply with Metropolitan's published engineering, design and water quality standards and will be subject to all applicable fees and charges routinely established by Metropolitan for the conveyance of water within its service territory. Any agreement as to the terms and conditions of the Water Project's use of the CRA will be negotiated between and entered into by Metropolitan and the Project participating agencies, not the Company. Discussions with Metropolitan regarding conveyance of Project water in the CRA have been led by SMWD. We expect arrangements would be recommended by Metropolitan staff and considered by its Board following BLM's clarification of the scope of the ARZC ROW related to the Water Project's conveyance pipeline, discussed above. Once arrangements are reached, Metropolitan would take action as a responsible agency under CEQA regarding the terms and conditions of the Water Project's use of the CRA to transport water to its participating agencies.

#### (3) Construction Financing

As described above, construction of Phase I of the Water Project would primarily consist of wellfield facilities at the Project site, a conveyance pipeline, and an energy source to pump water through the conveyance pipeline between the Project well-field and the CRA. The construction of these facilities, which we expect would cost approximately $250 million, will require capital financing that we expect will be secured by the proceeds of our definitive Purchase and Sale Agreements and the new facility assets. On May 1, 2017, the Company entered into a strategic transaction with funds affiliated with Apollo Global Management, LLC ("Apollo"), a leading global alternative investment manager with approximately $197 billion of assets under management, to initiate financial arrangements for the construction of Phase I. In furtherance of the strategic transaction, funds managed by affiliates of Apollo and the Company executed a series of agreements that will replace and refinance our existing $45 million senior secured debt, provide $15 million of new senior debt to fund immediate construction related expenditures, and conditionally commit up to $240 million for Phase I construction finance expenditures. The conditional commitment for up to $240 million is intended to provide the additional resources necessary to complete the construction of Phase I of the Water Project. However, Cadiz is not obligated to accept such financing from Apollo, and Apollo's commitment is conditional (see "Liquidity and Capital Resources", below).

### Agricultural Development

Within the Cadiz/Fenner Property, all of the existing 34,000 acres are currently zoned for agriculture. In 1993, we secured conditional use permits to develop agriculture on up to 9,600 acres of the property and withdraw groundwater from the underlying aquifer system for irrigation. We have since maintained various levels of crops on the Property as we developed the Water Project. In 2013, we entered into a lease agreement with a third party to develop up to 1,480 acres of lemons at the site, 520 acres of which have been planted to date.

In February 2016, we entered into a lease agreement with Fenner Valley Farms LLC ("FVF"), a subsidiary of Water Asset Management LLC, a related party, pursuant to which FVF leased, for a 99-year term, 2,100 acres at the Cadiz/Fenner property to be used to plant, grow and harvest agricultural crops ("FVF Lease"). As consideration for the lease, FVF paid the Company a one-time payment of $12,000,000 in February 2016. The acreage that was historically farmed by the Company and the acreage that is leased to a third party to develop lemons was included within the leased acreage. Following entry into this lease, the Company is no longer directly involved in the current agricultural operations at the site and all of our agricultural revenue is derived pursuant to the FVF Lease.

As part of the agricultural development to be conducted under the lease arrangements, the groundwater production capacity of the property's existing well-field is expected to be enhanced through infrastructure improvements that are complementary to the Water Project. While any additional well-field development for agricultural use would be financed by our agricultural partners as provided under our agricultural lease arrangements, the Company retained a call feature that allows us, at any time in the initial 20 years, to acquire the well-field and integrate any new agricultural well-field infrastructure developed into the Water Project's facilities.

### Additional Eastern Mojave Properties

We also own approximately 11,000 acres outside of the Cadiz/Fenner Valley area in two locations within the Mojave Desert in eastern San Bernardino County.

Our primary landholding outside of the Cadiz area is approximately 9,000 acres in the Piute Valley. This landholding is located approximately 15 miles from the resort community of Laughlin, Nevada, and about 12 miles from the Colorado River town of Needles, California. Extensive hydrological studies, including the drilling and testing of a full-scale production well, have demonstrated that this landholding is underlain by high-quality groundwater. The aquifer system underlying this property is naturally recharged by precipitation (both rain and snow) within a watershed of approximately 975 square miles and could be suitable for a water supply project, agricultural development or solar energy production. These properties are located in or adjacent to areas designated by the federal government as National Monument, Critical Desert Tortoise Habitat and/or Desert Wilderness Areas and are suitable candidates for preservation and conservation (see "Land Conservation Bank" below).

Additionally, we own acreage located near Danby Dry Lake in Ward Valley, approximately 30 miles southeast of our Cadiz/Fenner Valley properties. The Danby Dry Lake property is located approximately 10 miles north of the CRA. Initial hydrological studies indicate that the area has excellent potential for a water supply project. Certain of the properties in this area may also be suitable for agricultural development and/or preservation and conservation.

### Land Conservation Bank

Approximately 10,000 acres of our properties outside of the Cadiz/Fenner Valley area are located within terrain designated by the federal government as Critical Desert Tortoise Habitat and/or Desert Wilderness Areas and have limited development opportunities. In February 2015, the California Department of Fish and Wildlife approved our establishment of the Fenner Valley Desert Tortoise Conservation Bank ("Fenner Bank"), a land conservation bank that makes available approximately 7,500 acres of our properties located within Critical Desert Tortoise Habitat for mitigation of impacts to tortoise and other sensitive species that would be caused by development in the Southern California desert. Under its enabling documents, the Fenner Bank offers credits that can be acquired by entities that must mitigate or offset impacts linked to planned development. For example, this bank can service the mitigation requirements of renewable energy, military, residential and commercial development mitigation requirements for projects being considered throughout the desert. Credits sold by the Fenner Bank will fund our permanent preservation of the land as well as research by outside entities, including San Diego Zoo Global, into desert tortoise health and species protection.

### Other Opportunities

Other opportunities in the water and agricultural or related infrastructure business complementary to our current objectives could provide new opportunities for our Company.

Over the longer-term, we believe the population of Southern California, Nevada and Arizona will continue to grow, and that, in time, the economics of commercial and residential development at our properties may become attractive.

We remain committed to the sustainable use of our land and water assets, and will continue to explore all opportunities for environmentally responsible development of these assets. We cannot estimate which of these various opportunities will ultimately be utilized.

### Results of Operations

### Three Months Ended March 31, 2017, Compared to Three Months Ended March 31, 2016

We have not received significant revenues from our water resource and real estate development activity to date. Our revenues have been limited to our agricultural operations. As a result, we have historically incurred a net loss from operations. We had revenues of $108 thousand for the three months ended March 31, 2017, and $75 thousand for the three months ended March 31, 2016. We incurred a net loss of $7.2 million in the three months ended March 31, 2017, compared with a $8.8 million net loss during the three months ended March 31, 2016. The higher net loss during the quarter ended March 31, 2016 was primarily a result of the expensing of approximately $3.6 million in fees associated with the extension of our then existing first mortgage in the first quarter of 2016, offset by approximately $1.7 million in stock compensation in the first quarter of 2017 related to shares earned by employees for the achievement of a milestone award in connection with securing construction financing for the Water Project.

Our primary expenses are our ongoing overhead costs associated with the development of the Water Project (i.e., general and administrative expense) and our interest expense. We will continue to incur non-cash expenses in connection with our management and director equity incentive compensation plans.

***Revenues*** Revenue totaled $108 thousand during the three months ended March 31, 2017, compared to $75 thousand during the three months ended March 31, 2016.

***General and Administrative Expenses*** General and Administrative Expenses, exclusive of stock-based compensation costs, totaled $2.3 million and $2.2 million for the three months ended March 31, 2017 and 2016, respectively.

Compensation costs from stock and option awards for the three months ended March 31, 2017, were $1.8 million, compared with $166 thousand for the three months ended March 31, 2016. The higher 2017 expense primarily reflects shares earned by employees for the achievement of a milestone award in connection with securing construction financing for the Water Project.

***Depreciation*** Depreciation expense totaled $71 thousand during the three months ended March 31, 2017, compared to $73 thousand during the three months ended March 31, 2016.

***Interest Expense, net*** Net interest expense totaled $3.1 million during the three months ended March 31, 2017 compared to $4.2 million during the same period in 2016. The following table summarizes the components of net interest expense for the two periods (in thousands):

|  | Three Months Ended March 31, 2017 | 2016 |
| --- | ---: | ---: |
| Interest on outstanding debt | $2,371 | $2,242 |
| Amortization of debt discount | 692 | 1,892 |
| Amortization of deferred loan costs | 50 | 57 |
|  | $3,113 | $4,191 |

Amortization of debt discount decreased from $1.9 million to $700 thousand primarily due to a decrease in debt discount related to the conversion of convertible notes by certain of our lenders.

### Liquidity and Capital Resources

### Current Financing Arrangements

As we have not received significant revenues from our development activities to date, we have been required to obtain financing to bridge the gap between the time water resource and other development expenses are incurred and the time that revenue will commence. Historically, we have addressed these needs primarily through secured debt financing arrangements, private equity placements and the exercise of outstanding stock options and warrants. We have also worked with our secured lenders to structure our debt in a way which allows us to continue development of the Water Project and minimize the dilution of the ownership interests of common stockholders.

On May 1, 2017, we entered into a $60 million Credit Agreement with funds affiliated with Apollo Global Management, LLC ("Apollo") that will replace and refinance our existing $45 million senior secured mortgage debt ("Senior Secured Debt") and provide $15 million of new senior debt to fund immediate construction related expenditures. Additionally, funds affiliated with Apollo also executed a conditional commitment letter to fund up to $240 million in construction finance expenditures for the Cadiz Water Project, subject to the satisfaction of conditions precedent. It is intended to provide the additional resources necessary to complete the construction of Phase I of the Water Project. Apollo's commitment for up to $240 million is conditional and Cadiz is not obligated to accept such financing from Apollo.

The Senior Secured Debt and the convertible notes contain representations, warranties and covenants that are typical for agreements of this type, including restrictions that would limit our ability to incur additional indebtedness, incur liens, pay dividends or make restricted payments, dispose of assets, make investments and merge or consolidate with another person. However, while there are affirmative covenants, there are no financial maintenance covenants and no restrictions on our ability to issue additional common stock to fund future working capital needs. The debt covenants associated with the new loans were negotiated by the parties with a view towards our operating and financial condition as it existed at the time the agreements were executed. At March 31, 2017, we were in compliance with our debt covenants.

Limitations on our liquidity and ability to raise capital may adversely affect us. Sufficient liquidity is critical to meet our resource development activities. We currently expect our cash on hand to be sufficient to meet our short-term liquidity needs. We expect to close the Apollo transaction within 45 days of its May 1, 2017 signing date, which will allow us to meet our future cash needs. To the extent additional capital is required, we may increase liquidity through a variety of means, including equity or debt placements, through the lease, sale or other disposition of assets or reductions in operating costs. Equity placements, if made, would be undertaken only to the extent necessary, so as to minimize the dilutive effect of any such placements upon our existing stockholders.

As we continue to actively pursue our business strategy, additional financing may continue to be required. See "Outlook" below. The covenants in the term debt do not prohibit our use of additional equity financing and allow us to retain 100% of the proceeds of any equity financing. We do not expect the loan covenants to materially limit our ability to finance our water development activities.

At March 31, 2017, we had no outstanding credit facilities other than the Senior Secured Debt and the convertible notes.

**Cash Used in Operating Activities.** Cash used in operating activities totaled $2.6 million and $1.5 million for the three months ended March 31, 2017 and 2016, respectively. The cash was primarily used to fund general and administrative expenses related to our water development efforts and litigation costs for the three month periods ended March 31, 2017 and 2016. During the three months ended March 31, 2017, a previously recorded liability of $3 million related to a legal cash settlement was eliminated upon payment by our insurance carrier.

**Cash Used in Investing Activities.** Cash used in investing activities totaled $116 thousand for the three months ended March 31, 2017, and zero for the three months ended March 31, and 2016.

**Cash (Used in) Provided By Financing Activities.** Cash used in financing activities for the three months ended March 31, 2017 was $14 thousand compared to $893 thousand in cash provided by financing activities during the three months ended March 31, 2016.

### Outlook

***Short-Term Outlook.*** Our cash resources, together with the new cash resources to be provided by the Apollo transaction, provide us sufficient funds to meet any of our short term working capital needs. Once the Apollo transaction is closed, our working capital needs will be satisfied in the short term. Should we require additional working capital to fund operations, we expect to continue our historical practice of structuring our financing arrangements to match the anticipated needs of our development activities. See "Long-Term Outlook". No assurances can be given, however, as to the availability or terms of any new financing.

***Long-Term Outlook.*** In the longer term, we may need to raise additional capital to finance working capital needs, capital expenditures and any payments due under our Senior Secured Debt or our convertible notes at maturity (see "Current Financing Arrangements", above). Our future working capital needs will depend upon the specific measures we pursue in the entitlement and development of our water resources and other developments. Future capital expenditures will depend primarily on the progress of the Water Project.

We are evaluating the amount of cash needed, and the manner in which such cash will be raised, on an ongoing basis. We may meet any future cash requirements through a variety of means, including construction financing to be provided by the Apollo conditional commitment letter described above, equity or debt placements, or through the sale or other disposition of assets. Equity placements would be undertaken only to the extent necessary, so as to minimize the dilutive effect of any such placements upon our existing stockholders. Limitations on our liquidity and ability to raise capital may adversely affect us. Sufficient liquidity is critical to meet our resource development activities.

### Recent Accounting Pronouncements

See Note 1 to the Condensed Consolidated Financial Statements – "Basis of Presentation".

## Market risk

As filed, 200 characters.

As of March 31, 2017, all of the Company's indebtedness bore interest at fixed rates; therefore, the Company is not exposed to market risk from changes in interest rates on long-term debt obligations.

## Controls and procedures

As filed, 1,644 characters.

### Disclosure Controls and Procedures

The Company established disclosure controls and procedures to ensure that material information related to the Company, including its consolidated entities, is accumulated and communicated to senior management, including the Chief Executive Officer (the "Principal Executive Officer") and Chief Financial Officer (the "Principal Financial Officer") and to its Board of Directors. Based on their evaluation as of March 31, 2017, the Company's Principal Executive Officer and Principal Financial Officer have concluded that the Company's disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Securities Exchange Act of 1934) are effective to ensure that the information required to be disclosed by the Company in the reports that it files or submits under the Securities Exchange Act of 1934 is recorded, processed, summarized and reported within the time periods specified in Securities and Exchange Commission rules and forms, and such information is accumulated and communicated to management, including the principal executive and principal financial officers as appropriate, to allow timely decisions regarding required disclosures.

### Changes in Internal Controls Over Financial Reporting

In connection with the evaluation required by paragraph (d) of Rule 13a-15 under the Exchange Act, there was no change identified in the Company's internal controls over financial reporting that occurred during the first fiscal quarter of 2017 that has materially affected, or is reasonably likely to materially affect, the Company's internal controls over financial reporting.

## Risk factors

As filed, 1,398 characters.

### Our Credit Agreement and Conditional Commitment From Apollo Each Remain Subject to Closing Conditions

As previously reported by the Company on Form 8-K filed on May 2, 2017, on May 1, 2017, the Company entered into a $60 million Credit Agreement with funds affiliated with Apollo Global Management, LLC ("Apollo") that will replace and refinance the Company's existing $45 million senior secured mortgage debt and provide $15 million of new senior debt to fund immediate construction related expenditures. Additionally, funds affiliated with Apollo also executed a conditional commitment letter to fund up to $240 million in construction finance expenditures for the Cadiz Water Project, subject to the satisfaction of conditions precedent. The conditional commitment is intended to provide additional resources necessary to complete the construction of Phase I of the Water Project. The Credit Agreement transaction is expected to close within 45 days of its May 1, 2017, signing date, subject to satisfaction of conditions. Apollo's commitment for up to $240 million is conditional and subject to a number of conditions, many of which are not within the Company's control, and the Company is not obligated to accept such financing from Apollo. If either the Credit Agreement transaction or the $240 million commitment does not close, the Company will need to seek financing from other sources.

Filed May 9, 2017.