# Vista Gold Corp: Form 10-Q for the period ended Mar 31, 2026

- Company: [Vista Gold Corp](/companies/vgz.md) (CIK 783324)
- Form: 10-Q
- Filed: 2026-04-30
- Accepted by EDGAR: Apr 30, 2026, 16:16 ET
- Period: 2026-03-31
- Accession: 0000783324-26-000025
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/783324/000078332426000025/vgz-20260331x10q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/783324/000078332426000025/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2026-03-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2026-01-01 to 2026-03-31 | $0 | us-gaap:RevenueFromContractWithCustomerExcludingAssessedTax |
| Operating income | 3 months, 2026-01-01 to 2026-03-31 | −$3.3m | us-gaap:OperatingIncomeLoss |
| Net income | 3 months, 2026-01-01 to 2026-03-31 | −$3.1m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2026-01-01 to 2026-03-31 | −$0.02 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2026-01-01 to 2026-03-31 | −$0.02 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2026-01-01 to 2026-03-31 | 131,597,619 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months, 2026-01-01 to 2026-03-31 | −$2.2m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Cash and equivalents | at 2026-03-31 | $52.7m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2026-03-31 | $53.2m | us-gaap:AssetsCurrent |
| Total assets | at 2026-03-31 | $55.3m | us-gaap:Assets |
| Current liabilities | at 2026-03-31 | $1.8m | us-gaap:LiabilitiesCurrent |
| Total liabilities | at 2026-03-31 | $1.9m | us-gaap:Liabilities |
| Shareholders' equity | at 2026-03-31 | $53.4m | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 43,978 characters.

*The following discussion and analysis should be read in conjunction with our unaudited condensed consolidated financial statements for the three months ended March 31, 2026, and the related notes thereto, which have been prepared in accordance with generally accepted accounting principles in the United States (“U.S. GAAP”). This discussion and analysis contains forward-looking statements and forward-looking information that involve risks, uncertainties, and assumptions. Our actual results may differ materially from those anticipated in these forward-looking statements and information as a result of many factors. See section heading “Note Regarding Forward-Looking Statements” below.*

***All dollar amounts are in U.S. dollars in thousands, except per share amounts, commodity prices, and currency exchange rates unless specified otherwise.***

### Overview

Vista Gold Corp. and its subsidiaries (collectively, “Vista,” the “Company,” “we,” “our,” or “us”) operate as a development-stage company in the gold mining industry. Vista does not currently generate cash flows from mining operations.

Our flagship asset is the Mt Todd Gold Project (“Mt Todd” or the “Project”), a development-stage gold deposit located in the Tier-1 mining jurisdiction of Northern Territory, Australia (the “NT”). Mt Todd offers a large gold mineral reserve, development optionality, expansion opportunities, exploration upside, advanced local infrastructure, community support, and demonstrated economic feasibility.

On July 29, 2025, the Company announced the results of a new Mt Todd feasibility study focused on developing a 15,000 tonnes per day (“tpd”), or 5.3 million tonnes per annum (“tpa”), operation (the “Mt Todd FS” or the “Study”). The Mt Todd FS significantly decreased the initial capital, prioritized grade over tonnes, delivered stable gold production over the extended life of the project, and provided a fresh perspective for developing the Project using design and operating practices commonly employed by Australian gold operations.

The Mt Todd FS marks a significant shift in the strategy for Mt Todd, demonstrating the potential for development of a smaller, lower capital cost project than previously evaluated. The Study contemplates the use of contract mining, third-party power generation, and other practices to reduce development and operational risks. The Mt Todd FS demonstrates the opportunity for Mt Todd to deliver attractive economic returns with stable gold production over a 30-year mine life. The Study does not assume any expansion of the planned mining/processing rate, but the Company believes that the 15,000 tpd design provides opportunities for future expansion of the processing plant.

In January 2026, the Company announced continued progress at its Mt Todd gold project and outlined the pathway to initiate detailed engineering and design in 2027. The Company expects this milestone to initiate a period of approximately 27 months for design, construction, and commissioning.

Our focus for 2026 is on establishing the foundation for the successful execution of the Mt Todd project. Priorities include all activities leading to permit modification approvals to align existing approved permits with the Mt Todd FS; expanding corporate capability by building an Australia-based team to lead project development; completing pre-development optimizations as recommended in the Mt Todd FS to provide key inputs for detailed engineering and design; and project execution planning. On March 9, 2026, Vista closed a public offering (the “March 2026 Offering”) for aggregate gross proceeds totaling $44,850, with net proceeds of $42,006, to fund these priorities and other general corporate purposes.

We have commenced efforts to obtain permit modifications and are actively engaged with consultants, regulators, and stakeholders. Some modifications have already been submitted, and programs to support other submissions are in progress. We anticipate the approval of these modifications will be achieved in 2027.

Since the start of the year, we have hired four project management team members to be based in Perth and an approvals manager based in Darwin. We have increased our corporate capacity in the areas of projects/technical services, external relations/social performance, legal, and administration/finance/market relations. We are currently recruiting an Australian-based managing director who will be responsible for delivering the Mt Todd project. Later this year we plan to begin building the project development team.

We are completing pre-development optimizations in line with the recommendations presented in the Mt Todd FS. Recent drilling has provided core for selective metallurgical testing to optimize grind size and gold recoveries and provide data for the optimal selection and sizing of equipment for the process plant. We have commenced a geotechnical review, with drilling and geotechnical mapping in progress in the Batman pit to assess the opportunity to steepen the west pit wall, reduce stripping, and potentially convert additional mineral resources to mineral reserves.

#### Feasibility Study Highlights

- Average annual gold production of 153,000 ounces during years 1-15 and 146,000 over the 30-year life of mine
- Average ore grade of 1.04 grams gold per tonne (“g Au/t”) over the first 15 years of operations and 0.97 g Au/t over the life of mine
- Life of mine average gold recovery of 88.5% from 3-stage crush, single-stage sort, 2-stage grind, and carbon-in-leach (CIL) recovery circuit
- After-tax NPV5% of $1.1 billion, internal rate of return of 27.8%, and 2.7 year payback at a $2,500 per ounce gold price
- After-tax free cash flow at a $2,500 per ounce gold price of $1.6 billion for first 15 years of commercial operations
- Initial capital requirements of $425 million, a 59% reduction from the 2024 FS (as defined below)
- Capital Efficiency: $93 per ounce (initial capital : total ounces of gold produced)
- Benefit to Cost Ratio of 2.5 (NPV5% : initial capital)
- All-in Sustaining Cost (“AISC”) of $1,449 per ounce during years 1-15 and $1,499 per ounce during years 1-30

#### Notes to investors:

*(1) Proven and Probable Mineral Reserves are estimated in accordance with S-K 1300 (as defined below).*

*(2) See “Item 1. Business – Cautionary Note to Investors Regarding Estimates of Measured, Indicated and Inferred Resources and Proven and Probable Mineral Reserves” in the Company’s annual report on Form 10-K, filed February 28, 2025, for additional information.*

*(3) Capital efficiency, benefit to cost ratio, and AISC per ounce are non-U.S. GAAP financial measures; see “Non-U.S. GAAP Financial Measures” for additional disclosure.*

A technical report summary titled “*S-K 1300 Technical Report Summary – Mt Todd Gold Project – 15 ktpd Feasibility Study – Northern Territory, Australia”* with an effective date of July 29, 2025 and a filing date of September 11, 2025 (the “S-K 1300 Report”) for the Mt Todd FS was prepared in accordance with Item 1300 of Regulation S-K (“S-K 1300”) under the U.S. Securities Exchange Act of 1934, as amended (the “Exchange Act”) and filed on EDGAR at www.sec.gov on September 11, 2025.

A companion technical report titled “*NI 43-101 Technical Report, Mt Todd Gold Project, 15 ktpd Feasibility Study, Northen Territory Australia”* with an effective date of July 29, 2025 (the “NI 43-101 Report”) for Canadian purposes was prepared in accordance with Canadian National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) and filed on SEDAR+ at www.sedarplus.ca on September 11, 2025. The NI 43-101 Report is referenced herein for informational purposes only. The Mineral Resources and Mineral Reserves for the NI 43-101 Report are the same as the Mineral Resources and Mineral Reserves for the S-K1300 Report.

The Company previously completed a feasibility study for Mt Todd in 2022, with material project costs and economic returns updated in 2024 (the “2024 FS”). This study evaluated the development of a 50,000 tpd, nominally 17.75 million tpa, operation.

### Mineral Resources and Mineral Reserves Estimates

The tables below present the estimated Mineral Resources and Mineral Reserves, prepared in accordance with S-K 1300 and NI 43-101. The effective date of the Mineral Resources and Mineral Reserves estimates pursuant to the S-K 1300 Report and the NI 43-101 Report is July 25, 2025.

### Mt Todd Gold Project – Summary of Gold Mineral Resource (Exclusive of Gold Mineral Reserves)

### 0.40 g Au/t cut-off at US$1,950/oz

| ​ ​ ​ ​ ​ | ​ Batman Deposit ​ Tonnes (000s) | ​ ​ Grade (g Au/t) | ​ Contained Ounces (000s) | ​ ​ ​ ​ ​ | ​ Heap Leach Pad ​ Tonnes (000s) | ​ ​ Grade (g Au/t) | ​ Contained Ounces (000s) | ​ ​ ​ ​ ​ | ​ Quigleys Deposit ​ Tonnes (000s) | ​ ​ Grade (g Au/t) | ​ Contained Ounces (000s) | ​ ​ ​ ​ ​ | ​ Total ​ Tonnes (000s) | ​ ​ Grade (g Au/t) | ​ Contained Ounces (000s) |
| --- | ---: | ---: | ---: | --- | ---: | ---: | ---: | --- | ---: | ---: | ---: | --- | ---: | ---: | ---: |
| Measured | 47,143 | 0.61 | 930 | ​ | — | — | — | ​ | 3,702 | 1.13 | 134 | ​ | 50,845 | 0.65 | 1,064 |
| Indicated | 110,644 | 0.72 | 2,568 | ​ | — | — | — | ​ | 6,965 | 1.34 | 299 | ​ | 117,609 | 0.76 | 2,867 |
| **Measured & Indicated** | 157,787 | 0.69 | 3,498 | ​ | — | — | — | ​ | 10,667 | 1.26 | 433 | ​ | 168,454 | 0.73 | 3,931 |
| **​** | ​ | ​ | ​ | ​ | ​ | ​ | ​ | ​ | ​ | ​ | ​ | ​ | ​ | ​ | ​ |
| Inferred | 54,338 | 0.78 | 1,369 | ​ | — | — | — | ​ | 2,761 | 0.71 | 63 | ​ | 57,099 | 0.78 | 1,433 |

#### Notes:

- *Measured and Indicated Mineral Resources exclude Proven and Probable Mineral Reserves.*
- *Batman and Quigleys Mineral Resources are quoted at a 0.4 g Au/t cut-off grade.*
- *The Point of Reference for the Batman and Quigleys Mineral Resources estimates is in-situ at the property. The Point of Reference for the Heap Leach Pad Mineral Resources estimates is the physical Heap Leach Pad at the property.*
- *Batman and Quigleys: Mineral Resources constrained within a USD1,950/oz gold pit shell. Pit parameters: Mining Cost US$3.00/tonne, Processing Cost US$17.50/tonne processed, General and Administrative Cost US$1.50/tonne processed, Au Recovery 89.7%.*
- *Tetra Tech is the QP responsible for the Statement of Mineral Resources for the Batman deposit, Quigleys deposit, and Heap Leach Pad.*
- *The effective date of the Batman, Quigleys, and Heap Leach Pad Mineral Resource estimates under the requirements of S-K 1300 and NI 43-101 is July 25, 2025.*
- *Mineral Resources that are not Mineral Reserves have no demonstrated economic viability and do not meet all relevant modifying factors.*
- *Differences in the table due to rounding are not considered material.*
- *The Mineral Resources were estimated in accordance with S-K 1300, NI 43-101, and Canadian Institute of Mining Metallurgy and Petroleum Definition Standards for Mineral Resources and Reserves.*
- *The entirety of the Heap Leach Pad Mineral Resource is converted to Mineral Reserves in the S-K 1300 Report, therefore, a Mineral Resource exclusive of Mineral Reserves is not reported.*
- *“—” indicates no reported value.*
- *Tetra Tech is an engineering and consulting firm independent of the Company.*

### Mt Todd Gold Project – Summary of Gold Mineral Reserves

### Based on 15,000 tpd, 0.50 g Au/t cut-off at US$1,800/oz

| ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ | ​ Batman Deposit ​ Tonnes (000s) | ​ ​ Grade (g Au/t) | ​ ​ ​ Contained ​ ​ ​ Ounces ​ ​ ​ (000s) ​ | ​ Heap Leach Pad ​ Tonnes (000s) | ​ ​ Grade (g Au/t) | ​ ​ ​ Contained ​ ​ ​ Ounces ​ ​ ​ (000s) ​ | ​ Total ​ Tonnes (000s) | ​ ​ Grade (g Au/t) | ​ Contained Ounces (000s) |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Proven | 77,359 | 0.95 | 2,371 | — | — | — | 77,359 | 0.95 | 2,371 |
| Probable | 81,263 | 0.99 | 2,588 | 13,252 | 0.54 | 232 | 94,615 | 0.93 | 2,820 |
| **Proven & Probable** | 158,623 | 0.97 | 4,959 | 13,252 | 0.54 | 232 | 171,975 | 0.94 | 5,190 |

#### Notes:

- *The Mineral Reserves point of reference is the point where material is fed into the process plant.*
- *Batman deposit Mineral Reserves are reported using a 0.50 g Au/t cut-off grade and US$1,800/oz gold price.*
- *Mining Plus Pty Ltd is the QP responsible for the Statement of Mineral Reserves for Batman Deposit Proven and Probable Mineral Reserves.*
- *Because all the Heap Leach Pad Mineral Reserves are to be fed through the process plant, these Mineral Reserves are reported without a cut-off grade applied.*
- *Deepak Malhotra is the QP responsible for reporting the Heap Leach Pad Mineral Reserves.*
- *The effective date of the Batman and Heap Leach Mineral Reserves estimate under the requirements of S-K 1300 and NI 43-101 is July 25, 2025.*
- *Differences in the table due to rounding are not considered material.*
- *The Mineral Reserves were estimated in accordance with S-K 1300, 43-101, and Canadian Institute of Mining Metallurgy and Petroleum Definition Standards for Mineral Resources and Reserves.*
- *Mining Plus Pty Ltd is a consulting firm and Deepak Malhotra is a consultant; both are independent of the Company.*

### Results from Operations

### Summary

Cash totaled $52,729 and working capital was $51,360 at March 31, 2026. See “Liquidity and Capital Resources”. The Company had no debt as of March 31, 2026.

Consolidated net loss for the three months ended March 31, 2026 and 2025 was $3,145 and $2,708, or $0.02 and $0.02 per basic share, respectively. The principal components of the period-over-period changes are discussed below.

### Operating income and expenses

#### Exploration, property evaluation and holding costs

Exploration, property evaluation and holding costs were $1,654 and $1,538 for the three months ended March 31, 2026 and 2025, respectively. Recurring site activities were higher in 2026, due to the addition of project management team members and higher power costs due to water management pumping requirements, offset by lower project program costs in 2026 compared to the prior year which included work on the Mt Todd FS.

#### Corporate administration

Corporate administration costs were $1,631 and $1,298 during the three months ended March 31, 2026 and 2025. Expenses in the comparable three-month periods were higher because of additional legal, consulting, and board costs associated with ongoing advancement of Mt Todd.

### Non-operating income and expenses

#### Interest income

Interest income was $185 and $169 for the three months ended March 31, 2026 and 2025, respectively. The increase in the comparable three-month period was due to higher invested cash balances from the March 2026 Offering for part of the period.

### Financial Position, Liquidity and Capital Resources

### Operating activities

Net cash used in operating activities was $2,200 and $1,820 for the three months ended March 31, 2026 and 2025, respectively. The increase in operating cash outflows largely resulted from higher 2026 expenditures for corporate expenses and additional personnel in Australia.

### Investing activities

Net cash used in investing activities was $nil and $184 for the three months ended March 31, 2026 and 2025, respectively. Cash used in investing activities in 2025 was for expenditures for capitalized development costs and purchases of plant and equipment.

### Financing activities

During the three months ended March 31, 2026 and 2025, net cash of $41,307 and $24, respectively, was provided by financing activities. Cash provided by financing activities during the three months ended March 31, 2026 was $44,850 of proceeds from the March 2026 Offering, partially offset by $2,495 of underwriting and offering costs associated with the March 2026 Offering and payments of $1,048 for employee withholding taxes in lieu of issuing common shares of the

Company (“Common Shares”) earned from the vesting of restricted share unit awards. Cash provided by financing activities during the three months ended March 31, 2025 was $269 of net proceeds under the ATM Program (as defined below) offset by payments of $245 for employee withholding taxes in lieu of issuing Common Shares earned from the vesting of restricted share unit awards.

### Liquidity and capital resources

The Company continues to prioritize the efficient use of financial resources to advance Mt Todd. Our funding strategy is to maintain adequate liquidity to support near-term objectives while minimizing share dilution. The primary measure of liquidity considered by the Company is available cash, cash equivalents, and any short-term investments. As a secondary measure, we consider current assets, net of current liabilities (“Working Capital”).

The following table sets forth the Company’s primary and secondary measures of liquidity at March 31, 2026 and December 31, 2025:

| ​ ​ | ​ ​ ​ ​ | ​ ​ At March 31, 2026 | ​ ​ ​ ​ | ​ ​ At December 31, 2025 | ​ ​ |
| --- | --- | ---: | --- | ---: | --- |
| Cash and cash equivalents | ​ | $52,729 | ​ | $13,622 | ​ |
| Working Capital | ​ | $51,360 | ​ | $13,057 | ​ |

The net increase in cash and cash equivalents during the three months ended March 31, 2026 resulted primarily from net proceeds of the March 2026 Offering, offset by other net cash outflows. On March 9, 2026, Vista closed the March 2026 Offering of 17,940,000 Common Shares, inclusive of the underwriters’ exercise of their 15% overallotment option, at a price of $2.50 per Common Share. Aggregate gross proceeds from the Offering totaled $44,850. After deductions for underwriting discounts, commissions and other costs, net proceeds totaled $42,006. We intend to use the net proceeds to advance exploration and development activities at our Mt Todd gold project and for general corporate purposes. Details regarding financial results for the three months ended March 31, 2026 are presented in the “Results from Operations” section above and the preceding narratives in this section regarding operating activities, investing activities, and financing activities.

For the 12-month period following March 31, 2026, the Company estimates its net expenditures will include approximately $8,600 for recurring expenditures and approximately $7,100 for non-recurring project program costs. Recurring expenditures include ongoing Mt Todd site maintenance; other Australia non-site costs for personnel and general costs; and corporate costs. Non-recurring program costs relate primarily to activities in preparation for the start of detailed engineering, including: metallurgical and geotechnical evaluations; project execution planning; the preparation and submission of applications for permit modifications and related studies and other activities; treatment and discharge of water from the Batman pit; and other technical, social, and administrative programs to better position Mt Todd for the start of detailed engineering and design. As these programs advance, additional activities may arise that will require expenditures beyond management’s current estimates. Management expects to fund Vista’s activities during the next twelve months from existing Working Capital.

We are a party to an at-the-market offering agreement (the “ATM Agreement”) with H. C. Wainwright & Co., LLC (“Wainwright”). Under the ATM Agreement, the Company can, but is not obligated to, issue and sell Common Shares through Wainwright (the “ATM Program”). In connection with the March 2026 Offering, we suspended the ATM Agreement and terminated the continuous offering by us under the associated prospectus supplement. We will not make any sales of Common Shares pursuant to the ATM Agreement unless and until a new prospectus is filed and the expiration of a 90-day lockup period following completion of the March 2026 Offering. However, the ATM Agreement remains in effect. No Common Shares were issued under the ATM Program during the three months ended March 31, 2026.

Potential sources of additional Working Capital may include issuances of Common Shares through public or private offerings; filing of a new prospectus to reestablish availability of the ATM Program; other non-equity sources of project financing; and monetization of Vista’s remaining non-core assets, which include three royalty interests on properties in the U.S. and Canada, and used mill equipment that is being marketed by a third-party mining equipment dealer.

We believe our Working Capital as of March 31, 2026, together with other potential future sources of financing and sales of non-core assets, will be sufficient to fund our currently planned net corporate expenses, Mt Todd holding costs, and other Mt Todd programs for at least one year from the date of issuance of this quarterly report on Form 10-Q. Should the Company accelerate portions of its Mt Todd development plans, additional equity issuances or other forms of financing will be required to meet Working Capital requirements.

Vista’s long-term viability depends upon our ability to realize value from our principal asset, Mt Todd. Our funding strategy is to effectively prioritize activities that support our value realization objectives and, when considered appropriate, issue additional equity or utilize other means of financing. The underlying value and recoverability of the amounts shown as mineral properties and plant and equipment as presented in our Condensed Consolidated Balance Sheets depend on market and industry conditions, our ability to attract sufficient capital resources to execute our strategy, and the ultimate success of our programs to enhance and realize value at Mt Todd.

### Off-Balance Sheet Arrangements

We have no off-balance sheet arrangements.

### Contractual Obligations

We have no material contractual obligations as of March 31, 2026.

### Critical Accounting Policies

See “Critical Accounting Estimates and Recent Accounting Pronouncements” under Item 7 of our Annual Report on Form 10-K for the fiscal year ended December 31, 2025 as filed with the SEC.

### Non-U.S. GAAP Financial Measures

In this report, we have provided information prepared or calculated according to U.S. GAAP, as well as provided certain non-U.S. GAAP prospective financial performance measures. Because the non-U.S. GAAP performance measures do not have standardized meanings prescribed by U.S. GAAP, they may not be comparable to similar measures presented by other companies. These measures should not be considered in isolation or as substitutes for measures of performance prepared in accordance with U.S. GAAP. There are limitations associated with the use of non-U.S. GAAP measures. Since these measures do not incorporate revenues, changes in working capital and non-operating cash costs, they are not necessarily indicative of potential operating profit or loss, or cash flow from operations as determined in accordance with U.S. GAAP.

The non-U.S. GAAP measures presented in this report are not, and are not intended to be, presentations in accordance with U.S. GAAP. These metrics represent financial measures related to the Project.

We believe that these metrics help investors understand the economics of the Project as presented in the Mt Todd FS. We present the non-U.S. GAAP financial measures for the Project in the tables below. Presentation based on U.S. GAAP may cause results to vary from the amounts disclosed in this report. Other companies may calculate these measures differently.

### Determination of Non-U.S. GAAP Financial Measures

This report may include the following financial measures presented on a non-U.S. GAAP basis:

- Cash Costs per ounce produced;
- AISC per ounce;
- Capital Efficiency; and
- Benefit to Cost Ratio.

Cash Costs per ounce of gold produced and AISC per ounce of gold produced are non-U.S. GAAP metrics developed by the World Gold Council intended to improve transparency into the costs associated with producing gold and provide a standard for comparison across the industry. The Company reports Cash Costs and AISC on a per ounce basis and Cash Costs on a per tonne processed basis because we believe these metrics appropriately reflect mining costs over specified periods and the life of mine. The Company reports on Capital Efficiency and Benefit to Cost Ratio because these metrics provide a standard measurement of initial capital efficiency. Similar metrics are used in the gold mining industry as comparative benchmarks of performance.

Cash Costs consist of the Project’s operating costs, refining costs, the Jawoyn Royalty, and the Wheaton Royalty. The sum of these costs is divided by the corresponding ounces of gold produced or tonnes processed to determine Cash Cost per ounce or per tonne processed metrics, respectively.

AISC consists of Cash Costs (as described above), plus sustaining capital costs. The sum of these costs is divided by the corresponding ounces of gold produced to determine the AISC per ounce metric.

Costs excluded from Cash Costs and AISC include depreciation and amortization, exploration and development costs not required to achieve the gold production set out in the technical study, corporate costs or allocations, income taxes, NT Government royalties subject to legislative changes, financing charges, costs related to business combinations, asset acquisitions other than sustaining capital, and asset dispositions.

Capital Efficiency consists of initial capital expenditures divided by the ounces of gold produced.

Benefit to Cost Ratio consists of the after-tax NPV5% of project cash flows divided by initial capital.

The following table presents the calculations used to determine the non-U.S. GAAP financial measures presented in the report.

|  | Units | Years 1-15 | Life of Mine (30 Years) |
| --- | --- | ---: | ---: |
| Gold Produced | koz | 2,298 | 4,368 |
| Tonnes processed | kt | 77,512 | 157,445 |
| Mining Costs | $ millions | $ 1,433 | $ 2,606 |
| Processing Costs | $ millions | 1,372 | 2,774 |
| Site General and Administrative Costs | $ millions | 162 | 328 |
| Jawoyn Royalty | $ millions | 172 | 328 |
| Wheaton Royalty(1) | $ millions | 65 | 115 |
| Refining Cost | $ millions | 11 | 22 |
| Cash Costs | $ millions | 3,216 | 6,172 |
| Sustaining Capital | $ millions | 144 | 376 |
| AISC | $ millions | $ 3,330 | $ 6,548 |

| Per Ounce Produced ($ ÷ Gold Produced): |  |  |  |
| --- | --- | ---: | ---: |
| Mining Cost | $/oz | $ 623 | $ 597 |
| Processing Cost | $/oz | 597 | 635 |
| Site General and Administrative Costs | $/oz | 70 | 75 |
| Jawoyn Royalty | $/oz | 75 | 75 |
| Wheaton Royalty(1) | $/oz | 28 | 26 |
| Refining Cost | $/oz | 5 | 5 |
| Cash Costs | $/oz | $ 1,399 | $ 1,413 |
| Sustaining Capital | $/oz | 50 | 86 |
| AISC | $/oz | $ 1,449 | $ 1,499 |

| ​ ​ | Units | Initial Capital | ​ Sustaining Capital |
| --- | --- | --- | ---: |
| Capital Costs | $ millions | $ 425 | $ 442 |
| Total Gold Produced(2) | koz | 4,554 | 4,554 |
| Capital Efficiency | $/oz | $ 93 | $ 97 |
| ​ | ​ | ​ | ​ |
| ​ | ​ | ​ | ​ |
| After-tax NPV5% | $ millions | ​ | $1,060 |
| Initial Capital | $ millions | ​ | $ 425 |
| Benefit to Cost Ratio | $ millions | ​ | 2.5 |

*(1) The Wheaton Royalty is at an initial rate of 1% of gross revenue from the Project if the completion objectives for the Project are achieved by April 1, 2028. Beginning April 1, 2028, if the completion objectives for the Project are not achieved, the Royalty shall increase annually at a rate of up to 0.13% to a maximum Royalty rate of 2%. Any annual increases beginning April 1, 2028 shall be reduced on a pro rata basis to the extent that Mt Todd has initiated operations but has yet to achieve a completion test at an average daily processing rate of 15,000 tonnes per day. The values as presented represent a 1.13% Wheaton Royalty.*

*(2) Total Gold Produced includes ounces produced during the 30-year life of mine plus three years of reprocessing of heap leap pad material as self-funding reclamation.*

### Project Updates

### Mt Todd Gold Project, Northern Territory, Australia

#### Recent Developments

During the quarter, the Company continued to advance the Mt Todd Gold Project toward development by commencing the process of seeking permit modification approvals, hiring a significant part of the core project management team, and progressing key pre-development optimization in line with recommendations outlined in the Mt Todd FS.

The Company filed its first applications for permit modifications, is finalizing other applications, and has initiated studies to provide supporting documentation for others.

Since the start of the year, we have hired four project management team members to be based in Perth and an approvals manager based in Darwin. We have increased our corporate capacity in the areas of projects/technical services, external relations/social performance, legal, and administration/finance/market relations. We are currently recruiting an Australian-based managing director who will be responsible for delivering the Mt Todd project.

A comprehensive metallurgical test program that will evaluate new core obtained from drilling completed in late 2025 and early 2026 is about to begin at ALS facilities in Balcatta, Western Australia. This program is designed to optimize grind size and gold recoveries and generate additional metallurgical data that will provide critical inputs for the detailed engineering and design of the process plant. Results from the test program are expected in the third quarter of 2026.

In addition, the Company commenced a geotechnical program, with a drill rig and contractor personnel now on site. The results of this comprehensive geotechnical assessment are expected to support optimization of the current open pit design, including favorable changes to the slope of the pit wall on the west side of the pit with potential improvements to the stripping ratio of the current pit.

The recently concluded wet season in the NT saw approximately 50% more rainfall at Mt Todd than is recorded in a normal wet season. Regionally, the NT experienced considerable flooding as a result of unusually heavy rain received in March. The Company experienced only minor road damage and debris accumulation at the site with no accidents related to the flooding and road closures. The excessive rains resulted in greater accumulation of water in the Batman pit and tailings storage facility. The Company is pumping water from the tailings facility and has filed an application to treat the water in the Batman pit later this year and to commence discharging treated water, as it has in past years, during the next wet season.

Vista expects to incur expenditures of approximately $3,900 for its Mt Todd site management, development and environmental stewardship activities and $7,100 for non-recurring project program costs for the ensuing 12 months following March 31, 2026.

All scientific and technical information in this Management’s Discussion and Analysis has been reviewed and approved by Jeff Dang, Vista’s Executive General Manager Projects and Technical Services, and designated Qualified Person (“QP”) as defined by S-K 1300 and NI 43-101.

### Certain U.S. Federal Income Tax Considerations

Vista believes it is possible the Company may be classified as a “passive foreign investment company” (“PFIC”) as defined under Section 1297 of the U.S. Internal Revenue Code of 1986, as amended, in recent years and expects to continue to be a PFIC in the future. Current and prospective United States shareholders should consult their tax advisors as to the tax consequences of PFIC classification and the U.S. federal tax treatment of PFICs. Additional information on this matter is included in Vista’s Annual Report on Form 10-K for the year ended December 31, 2025, under “Part II. Item 5. Market for Registrant’s Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities — Certain United States Federal Income Tax Considerations for U.S. Residents.”

### Note Regarding Forward-Looking Statements

This quarterly report on Form 10-Q contains “forward-looking statements” within the meaning of the *Private Securities Litigation Reform Act of 1995* and forward-looking information under Canadian securities laws that are intended to be covered by the safe harbor created by such legislation. All statements, other than statements of historical facts, included in this quarterly report on Form 10-Q, our other filings with the SEC and Canadian securities commissions and in press releases and public statements by our officers or representatives that address activities, events or developments that we expect or anticipate will or may occur in the future are forward-looking statements and forward-looking information, including, but not limited to, such things as those listed below.

### Operations

- Our belief that Mt Todd is a development-stage gold deposit that offers a large gold mineral reserve, development optionality, expansion opportunities, exploration upside, advanced local infrastructure, community support, and demonstrated economic feasibility;
- the potential for development of a smaller, lower capital cost project at Mt Todd as defined in the Mt Todd FS;
- our belief that the Study reduces development and operational risks by incorporating the use of contract mining, third-party power generation, and other practices to reduce development and operational risks;
- our belief that the 15,000 tpd design provides opportunities for future expansion of the processing plant;
- our belief that the Mt Todd FS demonstrates the opportunity for Mt Todd to deliver attractive economic returns with stable gold production over a 30-year mine life;
- the feasibility of Mt Todd and the results of the Mt Todd FS;
- our estimates of future operating and financial performance;
- future exploration plans;
- our expectation of Mt Todd’s environmental, social, and economic impacts;
- our belief that continued progress at the Mt Todd gold project outlines a pathway to initiate detailed engineering and design in 2027;
- our expectation that initiating detailed engineering and design is a milestone that could initiate a period of approximately 27-months for design, construction, and commissioning;
- our intention that our focus for 2026 is on establishing the foundation for the successful execution of the Mt Todd project;
- our plan to recruit an Australian-based managing director who will be responsible for delivering the Mt Todd project;
- our anticipation that the approval of permit modifications will be achieved in 2027;
- our belief that results from the metallurgical test program are expected in the third quarter of 2026;
- the potential for the geotechnical review, with planned drilling around the Batman pit to assess the opportunity to steepen the west pit wall, reduce stripping, and potentially convert additional mineral resources to mineral reserves;
- our plan to begin building the project development team later in 2026;
- our belief that the results of the comprehensive geotechnical assessment are expected to support optimization of the current open pit design, including favorable changes to the slope of the pit wall on the west side of the pit with potential improvements to the stripping ratio of the current pit;
- our belief that additional activities may arise that will require expenditures beyond management’s current estimates;
- our expectation of funding Vista’s activities during the next twelve months from existing Working Capital;
- our belief that our working capital as of March 31, 2026, together with other potential future sources of financing and sales of non-core assets, will be sufficient to fund our currently planned net corporate expenses, Mt Todd holding costs, and other Mt Todd programs for at least one year from the date of issuance of this quarterly report on Form 10-Q;
- our belief that should the Company accelerate portions of its Mt Todd development plans, additional equity issuances or other forms of financing will be required to meet Working Capital requirements;
- our belief that the outcome of the remaining Mexico tax case cannot be estimated at this time;
- our belief that Vista’s long-term viability depends upon our ability to realize value from our principal asset, Mt Todd;
- our estimate that net recurring expenditures will be approximately $8,600 for recurring expenditures and approximately $7,100 for non-recurring project program costs in the 12 months following March 31, 2026;
- our expectation that Vista will incur approximately $3,900 for its Mt Todd site management, development, and environmental stewardship activities and $7,100 for non-recurring project program costs for the ensuing 12 months following March 31, 2026;

### Business and Industry

- our belief that it is possible the Company may be classified as PFIC for U.S. Federal tax purposes;
- the potential that we may grant stock-based compensation to our directors, officers, employees, and consultants; and
- the potential that future expenditures may be required for compliance with various laws and regulations governing the protection of the environment and our interactions with community stakeholders, among others.

Forward-looking statements and forward-looking information have been based upon a number of estimates and assumptions including material estimates and assumptions related to our current business and operating plans, as approved by the Company’s Board of Directors; our cash and other funding requirements and timing and sources thereof; results of pre-feasibility and feasibility studies, mineral resource and mineral reserve estimates, preliminary economic assessments and exploration activities; advancements of the Company’s required permitting processes; our experience working with regulators; current market conditions and project development plans. The words “estimate,” “plan,” “anticipate,” “expect,” “intend,” “believe,” “will,” “may” and similar expressions are intended to identify forward-looking statements and forward-looking information.

These statements involve known and unknown risks, uncertainties, assumptions and other factors which may cause our actual results, performance or achievements to be materially different from any results, performance or achievements expressed or implied by such forward-looking statements and forward-looking information. These factors include risks such as:

### Operating Risks

- feasibility study results and the accuracy of estimates and assumptions on which they are based;
- mineral resource and mineral reserve estimates, the accuracy of such estimates and the accuracy of sampling and subsequent assays and geologic interpretations on which they are based;
- technical and operational feasibility and the economic viability of deposits;
- our ability to obtain, renew or maintain the necessary licenses, authorizations and permits for Mt Todd, including its development plans and operating activities;
- market conditions supporting a decision to develop Mt Todd;
- delays in project development activities necessary for commencement of construction at Mt Todd;
- our reliance on third-party power generation and contract mining for the construction and operation of Mt Todd;
- increased costs that affect our operations or our financial condition;
- delays or disruptions in supply chains;
- our reliance on third parties to fulfill their obligations under agreements with us;
- whether projects not managed by us will comply with our standards or meet our objectives;
- whether our acquisition, exploration and development activities, as well as the realization of the market value of our assets, will be commercially successful and whether any transactions we enter into will maximize the realization of the market value of our assets;
- the success of any future joint ventures, partnerships, and other arrangements relating to our properties;
- perception of the potential environmental impact of Mt Todd;
- known and unknown environmental and reclamation liabilities, including reclamation requirements at Mt Todd;
- impacts of noncompliance with applicable laws, regulations, and standards for operating;
- potential challenges to the title to our mineral properties;
- events or changes in conditions may affect land use authorizations;
- opposition to construction or operation of Mt Todd;
- future water supply issues at Mt Todd;
- litigation or other legal claims;
- environmental lawsuits;

### Financial and Business Risks

- fluctuations in the price of gold;
- inflation and cost escalation;
- lack of adequate insurance to cover potential liabilities;
- the lack of cash dividend payments by us;
- our history of losses from operations;
- our ability to attract, retain, and hire key personnel;
- volatility in our stock price and gold equities generally;
- our ability to consummate a strategic transaction, obtain a development partner, or secure other means of financing for Mt Todd on favorable terms, if at all;
- our ability to raise additional capital or raise funds from the sale of non-core assets on favorable terms, if at all;
- general economic conditions adverse to Mt Todd development or operation;
- the potential acquisition of a control position in the Company for less than fair value as a result of industry consolidation or otherwise;
- evolving corporate governance and public disclosure regulations;
- intense competition in the mining industry;
- tax legislation, rulings, assessments, initiatives, or changes resulting therefrom on domestic and international levels;
- potential unfavorable outcome of Mexico tax litigation;
- fluctuation in foreign currency values;
- our possible status as a PFIC for U.S. federal tax purposes;
- cybersecurity breaches that threaten or disrupt our information technology systems;
- anti-bribery and anti-corruption laws;
- potential conflicts of interest arising from certain of our directors and officers serving as directors and officers of other companies in the natural resources sector;

### Industry Risks

- inherent hazards of mining exploration, development, and operating activities;
- a shortage of skilled labor, equipment, and supplies;
- the accuracy of calculations of mineral reserves and mineral resources and mineralized material and fluctuations therein based on metal prices, estimated costs, recoverability of metal in the mining process, and other relevant factors;
- changes in environmental regulations to which our exploration and development operations are subject could result in increased operating costs or our ability to operate at all; and
- changes in greenhouse gas emissions regulations and standards could result in increased operating costs or our ability to operate at all.

For a more detailed discussion of such risks and other important factors that could cause actual results to differ materially from those in such forward-looking statements and forward-looking information, please see the risk factors contained in our Annual Report on Form 10-K for the year ended December 31, 2025, under “Part I-Item 1A. Risk Factors”. Although we have attempted to identify important factors that could cause actual results to differ materially from those described in forward-looking statements and forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that these statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in the statements. Additional risks and uncertainties not currently known to us or that we currently deem to be immaterial may also materially adversely affect our business, financial condition, cash flows, and/or future results. Except as required by law, we assume no obligation to publicly update any forward-looking statements and forward-looking information, whether as a result of new information, future events, or otherwise.

## Controls and procedures

As filed, 1,497 characters.

### Disclosure Controls and Procedures.

At the end of the period covered by this quarterly report on Form 10-Q for the three months ended March 31, 2026, an evaluation was carried out under the supervision of and with the participation of our management, including the Chief Executive Officer (“CEO”) and Chief Financial Officer (“CFO”), of the effectiveness of the design and operations of our disclosure controls and procedures (as defined in Rule 13a-15(e) and Rule 15d-15(e) under the Exchange Act). Based on that evaluation, the CEO and the CFO have concluded that as of the end of the period covered by this quarterly report, our disclosure controls and procedures were effective in ensuring that: (i) information required to be disclosed by us in reports that we file or submit to the SEC under the Exchange Act is recorded, processed, summarized, and reported within the time periods specified in applicable rules and forms and (ii) material information required to be disclosed in our reports filed under the Exchange Act is accumulated and communicated to our management, including our CEO and CFO, as appropriate, to allow for accurate and timely decisions regarding required disclosure.

### Changes in Internal Control over Financial Reporting

There has been no change in our internal control over financial reporting during the three months ended March 31, 2026, that has materially affected, or is reasonably likely to materially affect, our internal control over financial reporting.

## Risk factors

As filed, 532 characters.

There have been no material changes from the risk factors set forth in our Annual Report on Form 10-K for the year ended December 31, 2025 as filed with the SEC and Canadian securities regulatory authorities in March 2026. The risks described in our Annual Report and as otherwise herein are not the only risks facing us. Additional risks and uncertainties not currently known to us or that we currently deem to be immaterial may also materially adversely affect our business, financial condition, cash flows, and/or future results.

Filed Apr 30, 2026.