# Public Service Enterprise Group Inc: Form 10-Q for the period ended Sep 30, 2013

- Company: [Public Service Enterprise Group Inc](/companies/peg.md) (CIK 788784)
- Form: 10-Q
- Filed: 2013-10-31
- Accepted by EDGAR: Oct 30, 2013, 22:34 ET
- Period: 2013-09-30
- Accession: 0000788784-13-000013
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/788784/000078878413000013/pseg-9302013xq3.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/788784/000078878413000013/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2013-09-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2013-07-01 to 2013-09-30 | $2.55bn | us-gaap:Revenues |
| Revenue | 9 months, 2013-01-01 to 2013-09-30 | $7.65bn | us-gaap:Revenues |
| Operating income | 3 months, 2013-07-01 to 2013-09-30 | $712.0m | us-gaap:OperatingIncomeLoss |
| Operating income | 9 months, 2013-01-01 to 2013-09-30 | $1.93bn | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2013-07-01 to 2013-09-30 | $100.0m | us-gaap:InterestExpense |
| Interest expense | 9 months, 2013-01-01 to 2013-09-30 | $303.0m | us-gaap:InterestExpense |
| Income tax | 3 months, 2013-07-01 to 2013-09-30 | $270.0m | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 9 months, 2013-01-01 to 2013-09-30 | $708.0m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2013-07-01 to 2013-09-30 | $390.0m | us-gaap:NetIncomeLoss |
| Net income | 9 months, 2013-01-01 to 2013-09-30 | $1.04bn | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2013-07-01 to 2013-09-30 | $0.77 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 9 months, 2013-01-01 to 2013-09-30 | $2.06 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2013-07-01 to 2013-09-30 | $0.77 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 9 months, 2013-01-01 to 2013-09-30 | $2.06 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2013-07-01 to 2013-09-30 | 507,694,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 9 months, 2013-01-01 to 2013-09-30 | 507,433,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 9 months, 2013-01-01 to 2013-09-30 | $2.44bn | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 9 months, 2013-01-01 to 2013-09-30 | $2.10bn | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Dividends paid | 3 months, 2013-07-01 to 2013-09-30 | $182.0m | us-gaap:PaymentsOfDividendsCommonStock |
| Dividends paid | 9 months, 2013-01-01 to 2013-09-30 | $546.0m | us-gaap:PaymentsOfDividendsCommonStock |
| Cash and equivalents | at 2013-09-30 | $448.0m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2013-09-30 | $3.74bn | us-gaap:AssetsCurrent |
| Total assets | at 2013-09-30 | $32.61bn | us-gaap:Assets |
| Current liabilities | at 2013-09-30 | $3.23bn | us-gaap:LiabilitiesCurrent |
| Long-term debt | at 2013-09-30 | $7.48bn | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2013-09-30 | $775.0m | us-gaap:LongTermDebtCurrent |
| Short-term borrowings | at 2013-09-30 | $0 | us-gaap:CommercialPaper |
| Shareholders' equity | at 2013-09-30 | $11.34bn | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 48,939 characters.

This combined MD&A is separately filed by PSEG, Power and PSE&G. Information contained herein relating to any individual company is filed by such company on its own behalf. Power and PSE&G each make representations only as to itself and make no representations whatsoever as to any other company.

PSEG’s business consists of three reportable segments, which are:

- **Power,** our wholesale energy supply company that integrates its generating asset operations with its wholesale energy, fuel supply, energy trading and marketing and risk management activities primarily in the Northeast and Mid-Atlantic United States,
- **PSE&G,** our public utility company which provides electric transmission services and distribution of electric energy and natural gas in New Jersey; implements demand response and energy efficiency programs and invests in solar generation, and
- **Energy Holdings,** which principally owns energy-related leveraged leases and solar generation projects. A subsidiary of Energy Holdings has been awarded a contract to manage the transmission and distribution assets of LIPA beginning on January 1, 2014.

Our business discussion in Part I, Item 1. Business of our 2012 Annual Report on 10-K (Form 10-K) provides a review of the regions and markets where we operate and compete, as well as our strategy for conducting our businesses within these markets, focusing on operational excellence, financial strength and making disciplined investments. Our risk factor discussion in Part I Item 1A of Form 10-K provides information about factors that could have a material adverse impact on our businesses. The following supplements that discussion and the discussion included in the Overview of 2012 and Future Outlook provided in Item 7 in our Form 10-K by describing significant events and business developments that have occurred during 2013 and changes to the key factors that we expect may drive our future performance. The following discussion refers to the Condensed Consolidated Financial Statements (Statements) and the Related Notes to Condensed Consolidated Financial Statements (Notes). This discussion should be read in conjunction with such Statements, Notes, the 2012 Form 10-K and the Quarterly Reports on Form 10-Q for the quarters ended June 30, 2013 and March 31, 2013.

### OVERVIEW OF 2013 AND FUTURE OUTLOOK

Our business plan is designed to maintain earnings stability while achieving growth in recognition of market, regulatory and economic trends. We continue to focus on operational excellence to provide the foundation for our financial strength, which enables us to invest in a disciplined way.

### Financial Results

The results for PSEG, PSE&G, Power and Energy Holdings for the three months and nine months ended September 30, 2013 and 2012 are presented below:

| Earnings (Losses) | Three Months Ended September 30, 2013 Millions | 2012 | Nine Months Ended September 30, 2013 | 2012 |
| --- | ---: | ---: | ---: | ---: |
| Power | $221 | $181 | $562 | $538 |
| PSE&G | 168 | 155 | 468 | 453 |
| Energy Holdings | (3) | 7 | 1 | 49 |
| Other (A) | 4 | 4 | 12 | 11 |
| **PSEG Net Income** | **$390** | **$347** | **$1,043** | **$1,051** |
| **Earnings Per Share (Diluted)** |  |  |  |  |
| **PSEG Net Income** | **$0.77** | **$0.68** | **$2.06** | **$2.07** |

(A) Other primarily includes parent company interest and financing activity and certain administrative and general expenses.

Power’s results above include the realized gains, losses and earnings on the Nuclear Decommissioning Trust (NDT) Fund and other related NDT activity and the impacts of non-trading mark-to-market (MTM) activity, which consist of the financial impact from positions with forward delivery dates.

The variances in our Net Income include the changes related to NDT and MTM shown in the chart below:

|  | Three Months Ended September 30, 2013 Millions, after tax | 2012 | Nine Months Ended September 30, 2013 | 2012 |
| --- | ---: | ---: | ---: | ---: |
| NDT Fund Income (Expense) (A) | $12 | $40 | $29 | $49 |
| Non-Trading MTM Gains (Losses) | $3 | $(76) | $(22) | $(34) |

(A) NDT Fund Income (Expense) includes the net realized gains, interest and dividend income and other costs related to the NDT Fund which are recorded in Other Income and Deductions. This also includes impairments on certain NDT securities which are included in Other-Than-Temporary Impairments and the interest accretion expense on Power’s nuclear Asset Retirement Obligation (ARO), which is recorded in Operation and Maintenance Expense and the depreciation related to the ARO asset.

Our $43 million increase in Net Income for the three months ended September 30, 2013 includes the MTM and NDT activity above and was also impacted by:

- higher revenues due to increased investments in transmission projects, and
- higher capacity revenues, and
- higher Operation and Maintenance Costs due primarily to planned maintenance costs at our gas-fired Bethlehem Energy Center (BEC) in New York and costs related to damage caused by Superstorm Sandy at our fossil plants, partly offset by cost control measures.

Our $8 million decrease in Net Income for the nine months ended September 30, 2013 was driven primarily by:

- lower volumes of electricity sold under our basic generation service (BGS) contracts at lower average prices,
- lower volumes of wholesale load contracts in the PJM and NE regions,
- higher generation costs due to higher fuel costs,
- higher Operation and Maintenance Costs in 2013, including costs related to damage caused by Superstorm Sandy, partially offset by cost control measures,
- higher Income Tax Expense at PSE&G and Energy Holdings due to the absence of tax benefits related to the settlement of the 1997-2006 Internal Revenue Service (IRS) audits in 2012, and
- net realized gains in September 2012 resulting from restructuring our NDT Fund.

These decreases were largely offset by

- higher capacity pricing in the PJM region resulting from higher auction prices as well as higher generation sold primarily in the PJM region,
- higher average gas prices on sales to third party customers, and
- higher revenues due to increased investments in transmission projects,

Under the PJM capacity auction conducted in May 2013, Power cleared 8,637 MW of its generating capacity at an average price of $166 per MW-day for the 2016-2017 delivery period. While this year's auction resulted in lower clearing prices for the PJM Regional Transmission Organization (RTO), Power benefited from higher prices than the rest of the RTO, as the majority of its generation fleet is situated in the relatively constrained Eastern part of PJM.

Power’s results also benefited from access to low cost natural gas from the Marcellus region through its existing transportation and storage contracts. Power manages these contracts primarily for the benefit of PSE&G’s customers through the basic gas supply service (BGSS) arrangement. During times of low customer demand for gas, Power can use the remaining transportation that is available to supply the Marcellus gas to its generating units in New Jersey.

At our regulated utility, we continued to invest capital in transmission and distribution infrastructure projects, aimed at maintaining the reliability of our service to our customers. PSE&G’s results for 2013 reflect the favorable impacts from these investments. We filed our 2014 Annual Formula Rate Update with the FERC in October of this year, which would provide for approximately $176 million in increased annual transmission revenues effective January 1, 2014. Over the past few years, these types of investments have altered the business mix of PSEG’s overall results of operations to reflect a higher percentage contribution by PSE&G.

### Regulatory, Legislative and Other Developments

In developing and implementing our strategy of operational excellence, financial strength and disciplined investment, we monitor significant regulatory and legislative developments. Competitive wholesale power market design is of particular importance to our results and we continue to advocate for policies and rules that promote competitive electricity markets. This includes opposing efforts by states to subsidize generation and supporting rule changes which we believe are necessary to avoid artificial price suppression and other distortions in the energy and capacity markets. For a more detailed discussion of the status of these efforts, refer to Part II. Item 5. Other Information—Federal Regulation—Capacity Market Issues—LCAPP.

We continue to advocate for the development and implementation of fair and reasonable rules by the U.S. Environmental Protection Agency (EPA). In particular, the EPA's 316(b) rule on cooling water intake could adversely impact future nuclear and fossil operations and costs. Clean Air Act (CAA) regulations governing hazardous air pollutants under the EPA's Maximum Achievable Control Technology (MACT) rules are also of significance; however, we believe our generation business remains well-positioned for such regulations if and when they are implemented. These matters are discussed in Part II. Item 5. Other Information—Environmental Matters—Climate Change—CO2 Regulation under the CAA.

As discussed in further detail under Part II. Item 5. Other Information—Federal Regulation—Transmission Regulation— Transmission Policy Developments, the FERC's rules under Order 1000 altered the right of first refusal previously held by incumbent utilities to build all transmission within their respective service territories. We are challenging the FERC's determination in court as we do not believe that the FERC sufficiently justified its decision to alter this right embedded in the FERC-approved contracts and tariffs. At the same time, the FERC's action presents opportunities for us to construct transmission outside of our service territory.

In the fourth quarter of 2012, we were severely impacted by Superstorm Sandy, which resulted in the highest level of customer outages in our history. We sustained significant damage to some of our generation, transmission and distribution facilities. The New Jersey Board of Public Utilities (BPU) issued an order allowing us to defer actually incurred prudent, incremental storm restoration costs not otherwise recoverable through base rates or insurance. In February 2013, the BPU initiated a generic proceeding to evaluate the prudency of extraordinary storm-related costs incurred by all of the regulated utilities as a result of the natural disasters experienced in New Jersey in 2011 and 2012. In June 2013, we made a compliance filing with the BPU providing the details of our storm restoration costs for Superstorm Sandy as well as other major storms and seeking to demonstrate that we responded to these extreme weather events in a timely, diligent and thorough manner and that the costs incurred were prudent. We requested that the BPU issue an Order approving the compliance filing and specifically finding that the storm costs incurred were reasonable and prudent, and should be recovered from ratepayers.

Power also incurred significant storm-related expenses, primarily for repairs at certain of its coal and gas-fired generating stations in the first nine months of 2013 (See Note 9. Commitments and Contingent Liabilities). We are seeking recovery from our insurers for the property damage, above our self-insured retentions; however, no assurances can be given relative to the timing or amount of any such recovery. In June 2013, we filed suit against the insurance carriers seeking legal interpretation of certain terms in the insurance policies regarding losses resulting from damage caused by Superstorm Sandy's storm surge. For a more detailed discussion concerning this proceeding, refer to Part II. Item 1. Legal Proceedings—Superstorm Sandy.

On February 20, 2013, we filed a petition with the BPU describing our Energy Strong program, consisting of $3.9 billion of proposed improvements we recommend making to our gas and electric distribution systems over a ten-year period to harden and improve resiliency. In the petition, we sought approval for $2.6 billion of the $3.9 billion of investments over an initial five year period, plus associated expenses, and to receive contemporaneous recovery of and on such investments. We cannot predict the outcome of this pending proceeding, including whether the program will be approved or the terms under which it would be approved. We anticipate seeking BPU approval to complete our investment under the program at a later date. In addition, we anticipate investing an additional $1.5 billion in our transmission system for the same reason. As proposed, we believe that the rate impacts of the Energy Strong program will be significantly muted as a result of scheduled reductions to customer bills that will be taking place over the next few years and assuming continued low gas prices. See Part II Item 5. Other Information—State Regulation—Energy Strong Program for additional details.

We continue to take all necessary steps in connection with the expected January 1, 2014 commencement of our management of the Long Island Power Authority (LIPA) transmission and distribution (T&D) system. Legislation enacted in New York in July 2013 authorized an expanded role for us in the management of LIPA's T&D system. A revised contract with LIPA was approved by the LIPA Board in October 2013, but implementation of the new contract remains subject to a number of factors, including LIPA’s receipt of a Private Letter Ruling from the IRS on the continued tax-exempt status of certain LIPA debt securities and LIPA’s approval of the proposed 2014 and 2015 operating and capital pass-through budgets. See Part II. Item 5. Other Information—Business Operations and Strategy—Energy Holdings—Products and Services for additional details.

### Operational Excellence

We emphasize operational performance while developing opportunities in both our competitive and regulated businesses. Flexibility in our generating fleet has allowed us to take advantage of market opportunities presented in the first nine months of the year as we remain diligent in managing costs. In the first nine months of 2013, our

- outstanding performance allowed us to increase generation to meet loads, and
- construction of transmission and solar projects proceeded on schedule and within budget.

### Financial Strength

Our financial position remained strong during the first nine months of 2013 as we:

- had cash on hand of $448 million as of September 30, 2013,
- extended the expiration date of approximately half of our credit facilities, and maintained substantial liquidity and solid investment grade credit ratings, as evidenced by the recent credit rating upgrades by Standard & Poor's (S&P) of PSEG, Power and PSE&G as disclosed below in Liquidity and Capital Resources—Credit Ratings,
- completed pension and other postretirement benefit funding for 2013,
- issued bonds at PSE&G to refinance its maturing debt at historically low rates and fund its capital program,
- repaid Power's maturing debt with cash on hand, and
- increased our indicated annual dividend to $1.44.

We expect to be able to fund our proposed Energy Strong program with internally generated cash and external debt financing.

### Disciplined Investment

We seek to invest in areas that complement our existing business and provide reasonable risk-adjusted returns. These areas include upgrading our energy infrastructure, responding to trends in environmental protection and providing new energy supplies in domestic markets with growing demand. In the first nine months of 2013 we

- made additional investments in transmission infrastructure projects,
- continued to execute our existing BPU-approved utility programs,
- obtained approval from the BPU to increase our spending up to $247 million and $199 million under our Solar 4 All Extension and Solar Loan III investment programs, respectively, and
- continued construction of a 19 MW solar project in Arizona.

Delays in the construction schedules of our projects could impact their costs as well as the timing of expected revenues.

### Future Outlook

Our future success will depend on our ability to continue to maintain strong operational and financial performance in a difficult economy and cost-constrained environment, to capitalize on or otherwise address appropriately regulatory and legislative developments and to respond to the issues and challenges described below. In order to do this, we must continue to:

- focus on controlling costs while maintaining safety and reliability and complying with applicable standards and requirements,
- successfully re-contract our open supply positions,
- execute our capital investment program, including investments for growth that yield contemporaneous and reasonable risk-adjusted returns, while enhancing the resiliency of our infrastructure and maintaining the reliability of the service we provide to our customers,
- advocate for measures to ensure the implementation by PJM and the FERC of market design rules that continue to protect competition and achieve appropriate Reliability Pricing Model (RPM) and BGS pricing, and
- engage multiple stakeholders, including regulators, government officials, customers and investors.

For the remainder of 2013 and beyond, the key issues and challenges we expect our business to confront include

- regulatory and political uncertainty, particularly with regard to future energy policy, design of energy and capacity markets, transmission policy and environmental regulation,
- uncertainty in the national and regional economic recovery, continuing customer conservation efforts, changes in energy usage patterns and evolving technologies, which impact customer demand,
- the continuing potential for sustained lower natural gas and electricity prices, both at market hubs and at locations where we operate,
- the aftermath of Hurricane Irene and Superstorm Sandy, including addressing the BPU's review of performance and communications, as well as cost recovery and opportunities for investment in system strengthening, including our proposed Energy Strong program,
- financially-stressed power plant leveraged lease investments,
- delays and other obstacles that might arise in connection with the construction of our transmission and distribution projects, including in connection with permitting and regulatory approvals, and
- the successful transition to our management of the LIPA T&D system.

### RESULTS OF OPERATIONS

### PSEG

Our results of operations are primarily comprised of the results of operations of our operating subsidiaries, Power, PSE&G and Energy Holdings, excluding charges related to intercompany transactions, which are eliminated in consolidation. We also include certain financing costs, charitable contributions and general and administrative costs at the parent company. For additional information on intercompany transactions, see Note 18. Related-Party Transactions. For an explanation of the variances, see the discussions for Power, PSE&G and Energy Holdings that follow the table below:

|  | Three Months Ended September 30, 2013 Millions | 2012 | Increase/ (Decrease) September 30, 2013 vs. 2012 Millions% |  | Nine Months Ended 2013 Millions | 2012 | Increase/ (Decrease) 2013 vs. 2012 Millions% |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Operating Revenues | $2,554 | $2,402 | $152 | 6 | $7,650 | $7,375 | $275 | 4 |
| Energy Costs | 801 | 879 | (78) | (9) | 2,711 | 2,819 | (108) | (4) |
| Operation and Maintenance | 713 | 619 | 94 | 15 | 2,069 | 1,876 | 193 | 10 |
| Depreciation and Amortization | 313 | 286 | 27 | 9 | 886 | 797 | 89 | 11 |
| Taxes Other than Income Taxes | 15 | 24 | (9) | (38) | 50 | 73 | (23) | (32) |
| Income from Equity Method Investments | 4 | 7 | (3) | (43) | 9 | 9 | — | N/A |
| Other Income and (Deductions) | 47 | 95 | (48) | (51) | 118 | 155 | (37) | (24) |
| Other-Than-Temporary Impairments | 3 | 2 | 1 | 50 | 7 | 14 | (7) | (50) |
| Interest Expense | 100 | 106 | (6) | (6) | 303 | 310 | (7) | (2) |
| Income Tax Expense | 270 | 241 | 29 | 12 | 708 | 599 | 109 | 18 |

### Power

|  | Three Months Ended September 30, 2013 Millions | 2012 | Increase/ (Decrease) September 30, 2013 vs. 2012 | Nine Months Ended 2013 | 2012 | Increase/ (Decrease) 2013 vs. 2012 |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Net Income | $221 | $181 | $40 | $562 | $538 | $24 |

For the three months ended September 30, 2013, the primary reasons for the $40 million increase in Net Income were:

- significant MTM losses in 2012 resulting from an increase in prices on forward positions, and
- higher capacity revenues in 2013.

These increases were partially offset by

- higher Operation and Maintenance Costs, due primarily to planned maintenance costs at our BEC plant and costs related to damage caused by Superstorm Sandy at our fossil plants, and
- $59 million of net realized gains in September 2012 resulting from restructuring our NDT Fund.

For the nine months ended September 30, 2013, the primary reasons for the $24 million increase in Net Income were:

- higher capacity pricing in the PJM region resulting from higher auction prices as well as higher generation sold primarily in the PJM region, and
- higher average gas prices on sales to third party customers.

These increases were largely offset by

- lower volumes of electricity sold under our BGS contracts at lower average prices,
- lower volumes of wholesale load contracts in the PJM and NE regions,
- higher generation costs due to higher fuel costs,
- higher Operation and Maintenance Costs in 2013, including costs related to damage caused by Superstorm Sandy at our fossil plants, and
- $59 million of net realized gains in September 2012 resulting from restructuring our NDT Fund.

The quarter and year-to date details for these variances are discussed below:

|  | Three Months Ended September 30, 2013 Millions | 2012 | Increase/ (Decrease) September 30, 2013 vs. 2012 Millions% |  | Nine Months Ended 2013 Millions | 2012 | Increase/ (Decrease) 2013 vs. 2012 Millions% |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Operating Revenues | $1,169 | $1,038 | $131 | 13 | $3,806 | $3,584 | $222 | 6 |
| Energy Costs | 430 | 456 | (26) | (6) | 1,786 | 1,725 | 61 | 4 |
| Operation and Maintenance | 304 | 255 | 49 | 19 | 866 | 780 | 86 | 11 |
| Depreciation and Amortization | 66 | 60 | 6 | 10 | 195 | 175 | 20 | 11 |
| Other Income (Deductions) | 34 | 84 | (50) | (60) | 78 | 119 | (41) | (34) |
| Other-Than-Temporary Impairments | 3 | 2 | 1 | 50 | 7 | 14 | (7) | (50) |
| Interest Expense | 26 | 35 | (9) | (26) | 85 | 97 | (12) | (12) |
| Income Tax Expense | 153 | 133 | 20 | 15 | 383 | 374 | 9 | 2 |

### Three Months Ended September 30, 2013 as Compared to 2012

**Operating Revenues** increased $131 million due to changes in generation and gas supply revenues.

***Generation Revenues*** increased $133 million due primarily to

- an increase of $147 million largely due to a $137 million increase primarily attributable to significant MTM losses in 2012 in the PJM region resulting from increases in prices on forward positions, and
- an increase of $78 million due to higher capacity revenues resulting from higher average auction prices and an increase in operating reserve revenues in the PJM region,
- partially offset by a decrease of $74 million due primarily to lower volumes of electricity sold under our BGS contracts and lower average pricing, and
- a net decrease of $18 million due primarily to lower volumes in the NE region as well as lower average prices in the PJM and NE regions on wholesale load contracts.

***Gas Supply Revenues*** decreased $2 million due primarily to

- a net decrease of $5 million in sales under the BGSS contract, primarily due to lower average gas prices partly offset by higher sales volumes,
- partially offset by a net increase of $3 million partially due to higher sales volumes to third party customers.

### Operating Expenses

**Energy Costs** represent the cost of generation, which includes fuel costs for generation as well as purchased energy in the market, and gas purchases to meet Power’s obligation under its BGSS contract with PSE&G. Energy Costs decreased $26 million due to

- ***Generation costs*** decreased $20 million due primarily to $28 million of lower fuel costs, reflecting utilization of lower volumes of coal and natural gas at lower average prices, partially offset by higher nuclear fuel prices. This decrease was partially offset by a net increase of $8 million due to energy purchases at higher average prices partly offset by the recovery of excess solar renewable energy credit (SREC) cost in PJM.
- ***Gas costs*** decreased $6 million due primarily to lower average prices under the BGSS contract and on sales to third party customers offset in part by higher sales volumes in 2013.

**Operation and Maintenance** increased $49 million due primarily to planned maintenance costs at our BEC plant and costs incurred from Superstorm Sandy in 2013 at our New Jersey fossil plants.

**Depreciation and Amortization** increased $6 million due primarily to a higher depreciable fossil asset base and completion of a steam path retrofit upgrade at our co-owned nuclear Peach Bottom Unit 2 in October 2012.

**Other Income and (Deductions)** decreased $50 million due primarily to net realized gains of $59 million resulting from restructuring our NDT Fund in September 2012, partially offset by lower NDT Fund realized losses in 2013.

**Other-Than-Temporary Impairments** increased $1 million due to higher impairments on the NDT Fund in 2013.

**Interest Expense** decreased $9 million due primarily to a decrease from lower outstanding debt in 2013 resulting from certain debt redeemed prior to maturity in December 2012, as well as the maturity of Senior Notes in April 2013, and lower interest expense due to interest costs we capitalized for projects under construction.

**Income Tax Expense** increased $20 million in 2013 due primarily to higher pre-tax income.

### Nine Months Ended September 30, 2013 as Compared to 2012

**Operating Revenues** increased $222 million due to changes in generation and gas supply revenues.

***Generation Revenues*** increased $130 million due primarily to

- an increase of $275 million due to higher capacity revenues resulting from higher average auction prices and an increase in operating reserve revenues in PJM, and
- higher revenues of $91 million due primarily to higher generation sold in the PJM and NE regions partly offset by lower average prices in PJM,
- partially offset by a decrease of $144 million due primarily to lower volumes of electricity sold under our BGS contracts and lower average pricing, and
- a net decrease of $92 million due to lower volumes on wholesale load contracts in the PJM and NE regions.

***Gas Supply Revenues*** increased $92 million due primarily to

- a net increase of $60 million in sales under the BGSS contract, substantially comprised of higher sales volumes due to colder average temperatures during the 2013 winter heating season, partially offset by lower average gas prices, and
- a net increase of $32 million due primarily to higher average gas prices, partially offset by lower sales volumes to third party customers.

### Operating Expenses

**Energy Costs** represent the cost of generation, which includes fuel costs for generation as well as purchased energy in the market, and gas purchases to meet Power’s obligation under its BGSS contract with PSE&G. Energy Costs increased $61 million due to

- ***Generation costs*** increased $18 million due primarily to $83 million of higher fuel costs, reflecting higher average realized natural gas prices, higher nuclear fuel costs, and the utilization of higher volumes of coal and oil, partially offset by lower average coal prices. The increase was partially offset by $21 million of lower energy purchases, recovery of excess SREC costs and a decrease of $44 million in congestion costs in PJM.
- ***Gas costs*** increased $43 million, principally related to obligations under the BGSS contract, reflecting higher sales volumes in 2013 due to colder average temperatures during the 2013 winter heating season, partially offset by lower average gas inventory costs.

**Operation and Maintenance** increased $86 million due primarily to $63 million in costs incurred from Superstorm Sandy in 2013 at our fossil plants, and $48 million of higher planned outage and maintenance costs in 2013, mainly at BEC, our Bergen gas-fired plant in New Jersey and Conemaugh coal-fired plant in Pennsylvania. This was partially offset by the recognition of a $25 million insurance recovery related to Superstorm Sandy.

**Depreciation and Amortization** increased $20 million due primarily to a higher depreciable asset base at Fossil, including placing into service the new gas-fired peaking units at Kearny, New Jersey and New Haven, Connecticut in June 2012 and completion of the steam path retrofit upgrade at our co-owned Peach Bottom Unit 2 in October 2012.

**Other Income and (Deductions)** decreased $41 million due primarily to the factors disclosed in the above analysis for the three months ended September 30, 2013 versus 2012.

**Other-Than-Temporary Impairments** decreased $7 million due to lower impairments on the NDT Fund in 2013.

**Interest Expense** decreased $12 million due primarily to a decrease from lower outstanding debt in 2013 resulting from certain debt redeemed prior to maturity in December 2012, as well as the maturity of Senior Notes in April 2013, partially offset by higher interest costs in 2013 since interest capitalization ceased for our Kearny and New Haven gas-fired peaking projects on their June 2012 in-service date.

**Income Tax Expense** increased $9 million in 2013 due primarily to higher pre-tax income.

### PSE&G

|  | Three Months Ended September 30, 2013 Millions | 2012 | Increase/ (Decrease) September 30, 2013 vs. 2012 | Nine Months Ended 2013 | 2012 | Increase/ (Decrease) 2013 vs. 2012 |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Net Income | $168 | $155 | $13 | $468 | $453 | $15 |

For the three months ended September 30, 2013, the primary reason for the $13 million increase in Net Income was higher transmission revenues due to increased investments in transmission projects.

For the nine months ended September 30, 2013, the primary reasons for the $15 million increase in Net Income were

- higher transmission revenues due to increased investments in transmission projects,
- partially offset by higher Income Tax Expense due to the absence of tax benefits related to the settlement of the 1997-2006 IRS audits in 2012.

The quarter and year-to-date details for these variances are discussed below:

|  | Three Months Ended September 30, 2013 Millions | 2012 | Increase/ (Decrease) September 30, 2013 vs. 2012 Millions% |  | Nine Months Ended 2013 Millions | 2012 | Increase/ (Decrease) 2013 vs. 2012 Millions% |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Operating Revenues | $1,666 | $1,683 | $(17) | (1) | $5,084 | $5,029 | $55 | 1 |
| Energy Costs | 661 | 756 | (95) | (13) | 2,208 | 2,380 | (172) | (7) |
| Operation and Maintenance | 408 | 366 | 42 | 11 | 1,204 | 1,092 | 112 | 10 |
| Depreciation and Amortization | 236 | 216 | 20 | 9 | 658 | 594 | 64 | 11 |
| Taxes Other Than Income Taxes | 15 | 24 | (9) | (38) | 50 | 73 | (23) | (32) |
| Other Income (Deductions) | 12 | 10 | 2 | 20 | 38 | 31 | 7 | 23 |
| Interest Expense | 75 | 73 | 2 | 3 | 223 | 220 | 3 | 1 |
| Income Tax Expense | 115 | 103 | 12 | 12 | 311 | 248 | 63 | 25 |

### Three Months Ended September 30, 2013 as Compared to 2012

**Operating Revenues** decreased $17 million due to changes in delivery, clause, commodity and other operating revenues.

***Commodity Revenue*** decreased $95 million due to lower Electric and Gas revenues. This is entirely offset as savings in Energy Costs. PSE&G earns no margin on the provision of BGS and BGSS to retail customers.

- Electric revenues decreased $92 million due primarily to $40 million in lower BGS revenues and $52 million in lower revenues from a reduced volume of sales of Non-Utility Generation (NUG) energy and lower Non-Utility Generation Charges (NGC) due to lower tariff rates. BGS sales decreased 6% due to customer migration to third party suppliers (TPS) and weather.
- Gas revenues decreased $3 million due to lower BGSS prices of $5 million, partially offset by higher BGSS volumes of $2 million primarily due to weather. The average price of natural gas was 7% lower in 2013 than in 2012.

***Delivery Revenues*** increased $52 million due primarily to an increase in transmission revenues.

- Transmission revenues were $46 million higher due to net rate increases resulting primarily from increased capital investments.
- Electric distribution revenues increased $7 million due primarily to an increase in Capital Infrastructure Program (CIP) related revenues of $14 million and higher Green Program Recovery Charges (GPRC) of $17 million, partially offset by lower sales volumes of $16 million, and lower Transitional Energy Facilities Assessment (TEFA) revenue of $8 million due to a lower TEFA rate.
- Gas distribution revenues decreased $1 million due primarily to lower Weather Normalization Clause (WNC) revenue of $6 million due to more normal weather compared to the prior period, partially offset by $3 million from higher sales volumes and $2 million from CIP related revenues.

***Clause Revenues*** increased $22 million due primarily to higher Securitization Transition Charge (STC) revenues of $10 million, higher Solar Pilot Recovery Charge (SPRC) revenue of $5 million and higher Margin Adjustment Clause (MAC) revenue of $7 million. The changes in STC, SPRC and MAC amounts were entirely offset by the amortization of Regulatory Assets and related costs in Operation and Maintenance (O&M), Depreciation and Amortization and Interest Expense. PSE&G does not earn margin on STC, SPRC or MAC collections.

***Other Operating Revenues*** increased $4 million due primarily to increased revenues from our miscellaneous electric operating revenues.

**Energy Costs** decreased $95 million. This is entirely offset by Commodity Revenue.

- Electric costs decreased $92 million or 14% due to $73 million in lower BGS and NUG volumes, $10 million of lower BGS and NUG prices and $9 million for decreased deferred cost recovery. BGS and NUG volumes decreased 11% due primarily to customer migration to TPS and weather.
- Gas costs decreased $3 million or 4% due to $5 million or 7% in lower prices, partially offset by $2 million or 3% in higher sales volumes due primarily to weather.

**Operation and Maintenance** increased $42 million, of which the most significant components were

- a $37 million increase in costs related primarily to Societal Benefit Charges (SBC), CIP and GPRC. Due to the nature of the SBC, CIP and GPRC clause mechanisms, these are entirely offset in revenues, and
- a $3 million increase in appliance service costs.

**Depreciation and Amortization** increased $20 million due primarily to

- an $11 million increase in amortization of Regulatory Assets, and
- an $8 million increase in depreciation of additional plant in service.

**Taxes Other Than Income Taxes** decreased $9 million due to a lower TEFA rate for electric and gas, partially offset by higher sales volumes for gas.

**Other Income and (Deductions)** net increase of $2 million was due primarily to an increase in Solar Loan interest income.

**Interest Expense** increased due primarily to higher average long-term debt partially offset by lower average securitization debt.

**Income Tax Expense** increased $12 million due primarily to higher pre-tax income.

### Nine Months Ended September 30, 2013 as Compared to 2012

**Operating Revenues** increased $55 million due to changes in delivery, clause, commodity and other operating revenues.

***Delivery Revenues*** increased $143 million due primarily to an increase in transmission revenues.

- Transmission revenues were $131 million higher due to net rate increases resulting primarily from increased capital investments.
- Gas distribution revenues increased $10 million due primarily to $58 million from higher sales volumes and an increase of $16 million in CIP related revenues, partially offset by lower WNC revenue of $61 million due to more normal weather compared to the prior period.
- Electric distribution revenues increased $2 million due primarily to an increase in CIP related revenues of $14 million and higher GPRC of $21 million, partially offset by lower TEFA revenue of $18 million due to a lower TEFA rate and lower sales volumes of $15 million.

***Clause Revenues*** increased $74 million due primarily to higher STC revenues of $35 million, higher SBC of $29 million, higher SPRC revenue of $8 million and higher MAC revenue of $2 million. The changes in STC, SBC, SPRC and MAC amounts were entirely offset by the amortization of Regulatory Assets and related costs in O&M, Depreciation and Amortization and Interest Expense. PSE&G does not earn margin on STC, SBC, SPRC or MAC collections.

***Other Operating Revenues*** increased $10 million due primarily to increased revenues from our appliance repair business and miscellaneous electric operating revenues.

***Commodity Revenue*** decreased $172 million due to lower Electric revenues, partially offset by higher Gas revenues. This is entirely offset as savings in Energy Costs. PSE&G earns no margin on the provision of BGS and BGSS to retail customers.

- Electric revenues decreased $267 million due primarily to $164 million in lower BGS revenues and $103 million in lower revenues from a lower volume of sales of NUG energy and lower NGC due to lower tariff rates. BGS sales decreased 6% due primarily to customer migration to TPS.
- Gas revenues increased $95 million due primarily to higher BGSS volumes.

**Energy Costs** decreased $172 million. This is entirely offset by Commodity Revenue.

- Electric costs decreased $267 million or 15% due to $177 million in lower BGS and NUG volumes, $54 million of lower BGS and NUG prices, and $36 million for decreased deferred cost recovery. BGS and NUG volumes decreased 10% due primarily to customer migration to TPS.
- Gas costs increased $95 million or 15% due primarily to higher sales volumes.

**Operation and Maintenance** increased $112 million, of which the most significant components were

- an $87 million increase in costs recognized related primarily to SBC, CIP and GPRC. Due to the nature of the SBC, CIP and GPRC clause mechanisms, these are entirely offset in revenues,
- an $8 million increase in costs relating to repairs from Superstorm Sandy and a colder winter, and
- a $9 million increase in appliance service costs.

**Depreciation and Amortization** increased $64 million due primarily to

- a $41 million increase in amortization of Regulatory Assets, and
- a $21 million increase in depreciation of additional plant in service.

**Taxes Other Than Income Taxes** decreased $23 million due to a lower TEFA rate for electric and gas, partially offset by higher sales volumes for gas.

**Other Income and (Deductions)** net increase of $7 million was due primarily to an increase in Solar Loan interest income.

**Interest Expense** increased due primarily to higher average long-term debt partially offset by lower average securitization debt.

**Income Tax Expense** increased $63 million due primarily to the absence of tax benefits related to the settlement of the 1997-2006 IRS audits in 2012 and higher pre-tax income.

### Energy Holdings

|  | Three Months Ended September 30, 2013 Millions | 2012 | Increase/ (Decrease) September 30, 2013 vs. 2012 | Nine Months Ended 2013 | 2012 | Increase/ (Decrease) 2013 vs. 2012 |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Net Income | $(3) | $7 | $(10) | $1 | $49 | $(48) |

For the three months ended September 30, 2013, the primary reasons for the $10 million decrease in Net Income were the impairment of real estate assets and legal expenses related to the LIPA contract expansion in 2013 and a gain on an asset sale in 2012.

For the nine months ended September 30, 2013, the primary reason for the $48 million decrease in Net Income was the absence of tax benefits related to the settlement of the 1997-2006 IRS audits in the prior year.

### LIQUIDITY AND CAPITAL RESOURCES

The following discussion of our liquidity and capital resources is on a consolidated basis, noting the uses and contributions, where material, of our three direct operating subsidiaries.

### Operating Cash Flows

Our operating cash flows combined with cash on hand and financing activities are expected to be sufficient to fund capital expenditures and shareholder dividend payments.

For the nine months ended September 30, 2013, our operating cash flow increased $124 million as compared to the same period in 2012. The net change was due primarily to net changes from Power and PSE&G, as discussed below.

### Power

Power’s operating cash flow increased $112 million from $1,172 million to $1,284 million for the nine months ended September 30, 2013, as compared to the same period in 2012, primarily resulting from higher earnings and an increase of $124 million related to margin deposits.

### PSE&G

PSE&G’s operating cash flow increased $8 million from $1,041 million to $1,049 million for the nine months ended September 30, 2013, as compared to the same period in 2012, due primarily to higher earnings and an increase from a net change in regulatory deferrals primarily related to BGSS gas costs and the collection of Gas Weather Normalization Charges, offset by higher payments for storm related costs. The increases were partially offset by higher tax payments.

### Short-Term Liquidity

PSEG meets its short-term liquidity requirements, as well as those of Power, primarily with cash and through the issuance of commercial paper. PSE&G maintains its own separate commercial paper program to meet its short-term liquidity requirements. Each commercial paper program is fully back-stopped by its own separate credit facilities.

The commitments under our credit facilities are provided by a diverse bank group. In March 2013, Power, PSEG and PSE&G amended their respective 5-year credit agreements scheduled to end in 2016, extending the expiration dates from April 2016 to March 2018. Of the total commitments of $2.1 billion under these agreements, $2.0 billion has been extended until 2018. The commitments for the $100 million balance will terminate in 2016. As of September 30, 2013, our total credit capacity was $4.3 billion.

As of September 30, 2013, no single institution represented more than 8% of the total commitments in our credit facilities.

As of September 30, 2013, our total credit capacity was in excess of our anticipated maximum liquidity requirements.

Each of our credit facilities is restricted as to availability and use to the specific companies as listed below; however, if necessary, the PSEG facilities can also be used to support our subsidiaries’ liquidity needs. Our total credit facilities and available liquidity as of September 30, 2013 were as follows:

| Company/Facility PSEG | As of September 30, 2013 Total Facility Millions | Usage |  | Available Liquidity | Expiration Date | Primary Purpose |
| --- | ---: | ---: | --- | ---: | --- | --- |
| 5-year Credit Facility | $500 | $5 | (D) | $495 | Mar 2017 | Commercial Paper (CP) Support/Funding/Letters of Credit |
| 5-year Credit Facility (A) | 500 | — |  | 500 | Mar 2018 | CP Support/Funding/Letters of Credit |
| **Total PSEG** | **$1,000** | **$5** |  | **$995** |  |  |
| **Power** |  |  |  |  |  |  |
| 5-year Credit Facility | $1,600 | $58 | (D) | $1,542 | Mar 2017 | Funding/Letters of Credit |
| 5-year Credit Facility (B) | 1,000 | — |  | 1,000 | Mar 2018 | Funding/Letters of Credit |
| Bilateral Credit Facility | 100 | 100 | (D) | — | Sept 2015 | Letters of Credit |
| **Total Power** | **$2,700** | **$158** |  | **$2,542** |  |  |
| **PSE&G** |  |  |  |  |  |  |
| 5-year Credit Facility (C) | $600 | $13 | (D) | $587 | Mar 2018 | CP Support/Funding/Letters of Credit |
| **Total PSE&G** | **$600** | **$13** |  | **$587** |  |  |
| **Total** | **$4,300** | **$176** |  | **$4,124** |  |  |

(A) In April 2016, this facility will be reduced by $23 million.

(B) In April 2016, this facility will be reduced by $48 million.

(C) In April 2016, this facility will be reduced by $29 million.

(D) Includes amounts related to letters of credit outstanding.

### Long-Term Debt Financing

PSE&G has $275 million of 6.33% Medium-Term Notes maturing in November 2013. For a discussion of our long-term debt transactions during 2013, see Note 10. Changes in Capitalization.

### Common Stock Dividends

On July 16, 2013, the Board of Directors declared a quarterly dividend of $0.36 per share of common stock for the third quarter of 2013. We expect to continue to pay cash dividends on our common stock; however, the declaration and payment of future dividends to holders of our common stock will be at the discretion of the Board of Directors and will depend upon many factors, including our financial condition, earnings, capital requirements of our businesses, alternate investment opportunities, legal requirements, regulatory constraints, industry practice and other factors that the Board of Directors deems relevant. For additional information related to cash dividends on our common stock, see Note 16. Earnings Per Share and Dividends.

### Credit Ratings

If the rating agencies lower or withdraw our credit ratings, such revisions may adversely affect the market price of our securities and serve to materially increase our cost of capital and limit access to capital. Outlooks assigned to ratings are as follows: stable, negative (Neg) or positive (Pos). There is no assurance that the ratings will continue for any given period of time or that they will not be revised by the rating agencies, if, in their respective judgments, circumstances warrant. Each rating given by an agency should be evaluated independently of the other agencies' ratings. The ratings should not be construed as an indication to buy, hold or sell any security.

In April 2013, S&P upgraded the corporate credit ratings on PSEG, Power and PSE&G to BBB+ from BBB and PSE&G's Mortgage Bond rating to A from A-. PSEG's, Power's and PSE&G's outlooks were changed to stable from positive. In May 2013, Moody's published updated credit opinions on PSEG, Power and PSE&G. PSEG's, Power's and PSE&G's ratings and outlooks remained unchanged. In July 2013, Fitch published updated research on PSEG, Power and PSE&G which kept their ratings and outlooks unchanged.

|  | Moody’s (A) | S&P (B) | Fitch (C) |
| --- | --- | --- | --- |
| **PSEG** |  |  |  |
| Outlook | **Stable** | **Stable** | **Stable** |
| Commercial Paper | P2 | A2 | F2 |
| **Power** |  |  |  |
| Outlook | **Stable** | **Stable** | **Stable** |
| Senior Notes | Baa1 | BBB+ | BBB+ |
| **PSE&G** |  |  |  |
| Outlook | **Stable** | **Stable** | **Stable** |
| Mortgage Bonds | A1 | A | A+ |
| Commercial Paper | P2 | A2 | F2 |

(A) Moody’s ratings range from Aaa (highest) to C (lowest) for long-term securities and P1 (highest) to NP (lowest) for short-term securities.

(B) S&P ratings range from AAA (highest) to D (lowest) for long-term securities and A1+ (highest) to D (lowest) for short-term securities.

(C) Fitch ratings range from AAA (highest) to D (lowest) for long-term securities and F1+ (highest) to D (lowest) for short-term securities.

### CAPITAL REQUIREMENTS

We expect that all of our capital requirements over the next three years will come from a combination of internally generated funds and external debt financing. In the Quarterly Report on Form 10-Q for the quarter ended June 30, 2013, PSE&G reported an increase in its projected base level capital expenditures of $215 million through 2015, as compared to the amounts disclosed in our Form 10-K for the year ended December 31, 2012. This increase primarily reflects our projected additional spending during the period under our Solar Loan III and Solar 4 All Extension programs which were approved by the BPU in May 2013. There have been no additional material changes to our projected capital expenditures at Power, PSE&G and Energy Holdings as compared to amounts disclosed in our Form 10-K for the year ended December 31, 2012. See Note 9. Commitments and Contingent Liabilities for additional information.

### ACCOUNTING MATTERS

For information related to recent accounting matters, see Note 2. Recent Accounting Standards.

## Market risk

As filed, 2,955 characters.

The market risk inherent in our market-risk sensitive instruments and positions is the potential loss arising from adverse changes in commodity prices, equity security prices and interest rates as discussed in the Notes to Condensed Consolidated Financial Statements. It is our policy to use derivatives to manage risk consistent with business plans and prudent practices. We have a Risk Management Committee comprised of executive officers who utilize a risk oversight function to ensure compliance with our corporate policies and risk management practices.

Additionally, we are exposed to counterparty credit losses in the event of non-performance or non-payment. We have a credit management process, which is used to assess, monitor and mitigate counterparty exposure. In the event of non-performance or non-payment by a major counterparty, there may be a material adverse impact on our financial condition, results of operations or net cash flows.

### Commodity Contracts

The availability and price of energy-related commodities are subject to fluctuations from factors such as weather, environmental policies, changes in supply and demand, state and federal regulatory policies, market rules and other events. To reduce price risk caused by market fluctuations, we enter into supply contracts and derivative contracts, including forwards, futures, swaps and options with approved counterparties. These contracts, in conjunction with physical sales and other services, help reduce risk and optimize the value of owned electric generation capacity.

### Value-at-Risk (VaR) Models

VaR represents the potential losses, under normal market conditions, for instruments or portfolios due to changes in market factors, for a specified time period and confidence level. We estimate VaR across our commodity businesses.

MTM VaR consists of MTM derivatives that are economic hedges, some of which qualify for hedge accounting. The MTM VaR calculation does not include market risks associated with activities that are subject to accrual accounting, primarily our generating facilities and some load serving activities.

The VaR models used are variance/covariance models adjusted for the change of positions with 95% and 99.5% confidence levels and a one-day holding period for the MTM activities. The models assume no new positions throughout the holding periods; however, we actively manage our portfolio.

| 95% Confidence Level, Loss could exceed VaR one day in 20 days | MTM VaR Three Months Ended September 30, 2013 Millions | Year Ended December 31, 2012 |
| --- | ---: | ---: |
| Period End | $9 | $18 |
| Average for the Period | $14 | $16 |
| High | $19 | $29 |
| Low | $9 | $7 |
| **99.5% Confidence Level, Loss could exceed VaR one day in 200 days** |  |  |
| Period End | $15 | $28 |
| Average for the Period | $22 | $25 |
| High | $30 | $46 |
| Low | $14 | $11 |

See Note 11. Financial Risk Management Activities for a discussion of credit risk.

## Controls and procedures

As filed, 1,879 characters.

### Disclosure Controls and Procedures

We have established and maintain disclosure controls and procedures as defined under Rule 13a-15(e) and 15d-15(e) promulgated under the Securities Exchange Act of 1934, as amended (the “Exchange Act”) that are designed to provide reasonable assurance that information required to be disclosed in the reports that are filed or submitted under the Exchange Act is recorded, processed, summarized and reported and is accumulated and communicated to the Chief Executive Officer (CEO) and Chief Financial Officer (CFO) of each respective company, as appropriate, by others within the entities to allow timely decisions regarding required disclosure. We have established a disclosure committee which includes several key management employees and which reports directly to the CFO and CEO of each of Public Service Enterprise Group Incorporated, PSEG Power LLC, and Public Service Electric and Gas Company. The committee monitors and evaluates the effectiveness of these disclosure controls and procedures. The CFO and CEO of each of Public Service Enterprise Group Incorporated, PSEG Power LLC, and Public Service Electric and Gas Company have evaluated the effectiveness of the disclosure controls and procedures and, based on this evaluation, have concluded that disclosure controls and procedures at each respective company were effective at a reasonable assurance level as of the end of the period covered by the report.

### Internal Controls

We continually review our disclosure controls and procedures and make changes, as necessary, to ensure the quality of our financial reporting. There have been no changes in internal control over financial reporting that occurred during the third quarter of 2013 that have materially affected, or are reasonably likely to materially affect, each registrant’s internal control over financial reporting.

## Risk factors

As filed, 121 characters.

There no additional Risk Factors to be added to those disclosed in Part I Item 1A of our 2012 Annual Report on Form 10-K.

Filed Oct 31, 2013.