# Public Service Enterprise Group Inc: Form 10-Q for the period ended Sep 30, 2014

- Company: [Public Service Enterprise Group Inc](/companies/peg.md) (CIK 788784)
- Form: 10-Q
- Filed: 2014-10-30
- Accepted by EDGAR: Oct 30, 2014, 21:28 ET
- Period: 2014-09-30
- Accession: 0000788784-14-000013
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/788784/000078878414000013/pseg-9302014xq3.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/788784/000078878414000013/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2014-09-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2014-07-01 to 2014-09-30 | $2.64bn | us-gaap:Revenues |
| Revenue | 9 months, 2014-01-01 to 2014-09-30 | $8.11bn | us-gaap:Revenues |
| Operating income | 3 months, 2014-07-01 to 2014-09-30 | $746.0m | us-gaap:OperatingIncomeLoss |
| Operating income | 9 months, 2014-01-01 to 2014-09-30 | $1.82bn | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2014-07-01 to 2014-09-30 | $100.0m | us-gaap:InterestExpense |
| Interest expense | 9 months, 2014-01-01 to 2014-09-30 | $291.0m | us-gaap:InterestExpense |
| Income tax | 3 months, 2014-07-01 to 2014-09-30 | $261.0m | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 9 months, 2014-01-01 to 2014-09-30 | $633.0m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2014-07-01 to 2014-09-30 | $444.0m | us-gaap:NetIncomeLoss |
| Net income | 9 months, 2014-01-01 to 2014-09-30 | $1.04bn | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2014-07-01 to 2014-09-30 | $0.87 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 9 months, 2014-01-01 to 2014-09-30 | $2.05 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2014-07-01 to 2014-09-30 | $0.88 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 9 months, 2014-01-01 to 2014-09-30 | $2.06 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2014-07-01 to 2014-09-30 | 507,422,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 9 months, 2014-01-01 to 2014-09-30 | 507,402,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 9 months, 2014-01-01 to 2014-09-30 | $2.54bn | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 9 months, 2014-01-01 to 2014-09-30 | $1.92bn | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Dividends paid | 3 months, 2014-07-01 to 2014-09-30 | $187.0m | us-gaap:PaymentsOfDividendsCommonStock |
| Dividends paid | 9 months, 2014-01-01 to 2014-09-30 | $561.0m | us-gaap:PaymentsOfDividendsCommonStock |
| Cash and equivalents | at 2014-09-30 | $703.0m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2014-09-30 | $3.85bn | us-gaap:AssetsCurrent |
| Total assets | at 2014-09-30 | $34.15bn | us-gaap:Assets |
| Current liabilities | at 2014-09-30 | $3.14bn | us-gaap:LiabilitiesCurrent |
| Long-term debt | at 2014-09-30 | $8.39bn | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2014-09-30 | $316.0m | us-gaap:LongTermDebtCurrent |
| Short-term borrowings | at 2014-09-30 | $0 | us-gaap:CommercialPaper |
| Shareholders' equity | at 2014-09-30 | $12.08bn | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 53,342 characters.

This combined MD&A is separately filed by Public Service Enterprise Group Incorporated (PSEG), PSEG Power LLC (Power) and Public Service Electric and Gas Company (PSE&G). Information contained herein relating to any individual company is filed by such company on its own behalf. Power and PSE&G each make representations only as to itself and make no representations whatsoever as to any other company.

PSEG's business consists of two reportable segments, our principal direct wholly owned subsidiaries, which are:

- **Power,** our wholesale energy supply company that integrates its nuclear, fossil and renewable generating asset operations with its wholesale energy, fuel supply, energy trading and marketing and risk management activities primarily in the Northeast and Mid-Atlantic United States, and
- **PSE&G,** our public utility company which primarily provides electric transmission services and distribution of electric energy and natural gas, implements demand response and energy efficiency programs and invests in solar generation in New Jersey.

PSEG's other direct wholly owned subsidiaries are: PSEG Energy Holdings L.L.C. (Energy Holdings), which earns its revenues primarily from its portfolio of lease investments; PSEG Long Island LLC (PSEG LI), which effective January 1, 2014, operates the Long Island Power Authority's (LIPA) transmission and distribution (T&D) system under a contractual agreement; and PSEG Services Corporation (Services), which provides us and these operating subsidiaries with certain management, administrative and general services at cost.

Our business discussion in Part I, Item 1. Business of our 2013 Annual Report on 10-K (Form 10-K) provides a review of the regions and markets where we operate and compete, as well as our strategy for conducting our businesses within these markets, focusing on operational excellence, financial strength and making disciplined investments. Our risk factor discussion in Part I, Item 1A. Risk Factors of Form 10-K provides information about factors that could have a material adverse impact on our businesses. The following supplements that discussion and the discussion included in the Overview of 2013 and Future Outlook provided in Item 7 in our Form 10-K by describing significant events and business developments that have occurred during 2014 and changes to the key factors that we expect may drive our future performance. The following discussion refers to the Condensed Consolidated Financial Statements (Statements) and the Related Notes to Condensed Consolidated Financial Statements (Notes). This discussion should be read in conjunction with such Statements, Notes and the 2013 Form 10-K and the Quarterly Reports on Form 10-Q for the quarters ended June 30, 2014 and March 31, 2014.

### OVERVIEW OF 2014 AND FUTURE OUTLOOK

Our business plan is designed to achieve growth while managing the risks associated with fluctuating commodity prices and changes in customer demand. We continue our focus on operational excellence, financial strength and disciplined investment. These guiding principles have provided the base from which we have been able to execute our strategic initiatives, including:

- Growing our utility operations through continued investment in T&D infrastructure projects with greater diversity of regulatory oversight, and
- Maintaining a reliable generation fleet with the flexibility to utilize a diverse mix of fuels to allow us to respond to market volatility and capitalize on opportunities as they arise in the locations in which we operate.

### Financial Results

The results for PSEG, PSE&G and Power for the three months and nine months ended September 30, 2014 and 2013 are presented as follows:

| Earnings (Losses) | Three Months Ended September 30, 2014 Millions | 2013 | Nine Months Ended September 30, 2014 | 2013 |
| --- | ---: | ---: | ---: | ---: |
| Power | $222 | $226 | $440 | $577 |
| PSE&G | 200 | 168 | 565 | 468 |
| Other (A) | 22 | (4) | 37 | (2) |
| **PSEG Net Income** | **$444** | **$390** | **$1,042** | **$1,043** |
| **PSEG Net Income Per Share (Diluted)** | **$0.87** | **$0.77** | **$2.05** | **$2.06** |

(A) Other includes activities at the parent company, PSEG LI, and Energy Holdings as well as intercompany eliminations.

Power’s results above include the realized gains, losses and earnings on the Nuclear Decommissioning Trust (NDT) Fund and other related NDT activity and the impacts of non-trading mark-to-market (MTM) activity, which consist of the financial impact from positions with forward delivery dates.

The variances in our Net Income include the changes related to NDT and MTM shown in the following table:

|  | Three Months Ended September 30, 2014 Millions, after tax | 2013 | Nine Months Ended September 30, 2014 | 2013 |
| --- | ---: | ---: | ---: | ---: |
| NDT Fund Income (Expense) (A) | $17 | $12 | $40 | $29 |
| Non-Trading MTM Gains (Losses) | $36 | $3 | $(138) | $(22) |

(A) NDT Fund Income (Expense) includes the net realized gains, interest and dividend income and other costs related to the NDT Fund which are recorded in Other Income and Deductions, and impairments on certain NDT securities recorded as Other-Than-Temporary Impairments. Interest accretion expense on Power’s nuclear Asset Retirement Obligation (ARO) is recorded in Operation and Maintenance (O&M) Expense and the depreciation related to the ARO asset is recorded in Depreciation and Amortization Expense.

Our $54 million increase in Net Income for the three months ended September 30, 2014 was driven by

- lower pension and other postretirement (OPEB) costs and lower maintenance costs due to a planned outage at our combined cycle Bethlehem Energy Center (BEC) fossil plant in 2013,
- higher revenues due to increased investments in transmission projects, and
- lower income tax expense due to tax benefits related to the settlement of the Internal Revenue Service audits for the years 2007-2010.

These increases were partially offset by lower capacity revenues resulting from lower average auction prices in PJM.

Our Net Income for the nine months ended September 30, 2014 remained nearly level with Net Income for the comparable prior year period. While we experienced

- higher sales volumes under the basic gas supply service (BGSS) contract due to colder average temperatures in the 2014 winter heating season,
- higher volumes of gas sold to third party customers,
- higher revenues due to increased investments in transmission projects, and
- lower pension and OPEB costs and lower storm costs related to Superstorm Sandy,

such increases were completely offset by

- higher MTM losses in 2014 resulting from an increase in prices on forward positions,
- lower volumes of electricity sold under our basic generation service (BGS) contracts resulting from serving fewer tranches in 2014, and
- higher generation costs due to higher fuel costs and higher gas costs related to the BGSS contract.

Power’s results benefited from access to natural gas supplies through its existing firm pipeline transportation contracts during the cold weather experienced in the first quarter of 2014. Power manages these contracts for the benefit of PSE&G’s customers through the BGSS arrangement. The contracts are sized to ensure delivery of a reliable gas supply to PSE&G customers on peak winter days. When pipeline capacity beyond the customers’ needs is available, Power can use it to supply gas to its generating units in New Jersey and to make third party sales.

Under the PJM capacity auction conducted in May 2014, Power cleared 8,693 MW of its generating capacity at an average price of $164.61 MW-day for the 2017-2018 delivery period, a price consistent with what has been realized in the past three auctions. For a more detailed discussion on the Reliability Pricing Model (RPM) capacity auction, refer to Part II, Item 5. Other Information—Federal Regulation—Capacity Market Issues—PJM.

Power’s 2014 results were unfavorably impacted by an extended refueling outage at Salem Unit 2. A planned refueling outage began on April 12, 2014 but was extended due to repairs to the Reactor Coolant Pump Turning Vanes. Salem Unit 2 returned to service on July 14, 2014.

At PSE&G, our regulated utility, we continued to invest capital in T&D infrastructure projects aimed at maintaining the reliability of our service to our customers. PSE&G’s results for the first half of 2014 reflect the favorable impacts from these investments as well as a slowly improving economy. Effective January 1, 2014, PSE&G's annual formula rate increased our annual transmission revenues by approximately $171 million. In October 2014, we filed our 2015 Annual Formula Rate Update with the Federal Energy Regulatory Commission (FERC), which would provide $182 million in increased annual transmission revenues effective January 1, 2015. Over the past few years, these types of investments have altered the business mix of our overall results of operations to reflect a higher percentage contribution by PSE&G.

### Regulatory, Legislative and Other Developments

In developing and implementing our strategy of operational excellence, financial strength and disciplined investment, we closely monitor significant regulatory and legislative developments. Transmission planning rules and wholesale power market design are of particular importance to our results and we continue to advocate for policies and rules that promote fair and efficient electricity markets.

We also advocate for the development and implementation of fair and reasonable rules by the U.S. Environmental Protection Agency (EPA) and state environmental regulators. On May 19, 2014, the EPA released the final Clean Water Act Section 316(b) rule on cooling water intake that establishes new requirements for the regulation of cooling water intakes at existing power plants and industrial facilities with a design flow of more than two million gallons of water per day. Eight of Power’s generating facilities and three of its jointly-owned generating facilities are subject to the rule. As adopted by the EPA, the rule requires that cooling water intake structures reflect the best technology available for minimizing adverse environmental impacts, primarily by reducing the amount of fish and shellfish that are impinged or entrained at a cooling water intake structure. Under this standard, power facilities have the flexibility to select one of several options as their method of compliance. However, the EPA has structured the rule so that each state will continue to consider renewal permits for existing power facilities on a case by case basis, and will require facilities to conduct a wide range of studies related to impingement mortality and entrainment and submit the results with their permit applications. A federal court challenge to the EPA rule is pending. We are unable to predict the outcome that these permitting decisions may take and the effect, if any, that they may have on us although such impacts could be material. See Item 1. Note 8. Commitments and Contingent Liabilities and Part II, Item 5. Other Information—Environmental Matters—Water Pollution Control for additional information.

On June 18, 2014, the EPA issued a proposed greenhouse gas emissions regulation for existing power plants. The regulation establishes state-specific emission rate targets based on implementation of the best system of emission reduction. States may choose these or other methodologies to achieve the necessary reductions of carbon dioxide emissions. The EPA is requesting comment on many aspects of the proposal and therefore, the final rule may look considerably different than the proposal. We continue to work with state and federal regulators, as well as industry partners, to determine the potential impact of the regulation. See Part II, Item 5. Other Information—Environmental Matters—Climate Change for additional information.

In addition, Clean Air Act (CAA) regulations governing hazardous air pollutants under the EPA's Maximum Achievable Control Technology rules are also of significance; however, we believe our generation business remains well-positioned for such air pollution control regulations if and when they are implemented.

The FERC’s rule under Order 1000 altered the right of first refusal previously held by incumbent utilities to build all transmission within their respective service territories. Our challenge to the rule itself was rejected by the federal court. However, PJM’s implementation of the rule has minimized the risk associated with the FERC’s changes to the right of first refusal by carving out categories of projects that will continue to default to incumbent transmission owners. Further, the FERC's action presents opportunities for us to construct transmission outside of our service territory. In April 2013, PJM initiated a solicitation process pursuant to Order 1000 to review technical solutions to improve the operational performance in the Artificial Island area, consisting of our Salem Units 1 and 2 and Hope Creek nuclear generation facilities. In June 2014, PJM’s management recommended approval by its Board of a 500 kV project to be constructed by PSE&G to address performance issues at Artificial Island. In July 2014, the PJM Board announced that it was deferring the selection of a project to enable four developers, including PSE&G, to supplement their project proposals by, among other things, re-evaluating the costs of their respective proposals. In September 2014, PSE&G and three other finalists submitted supplemental proposals. PJM currently expects to select a project in the first quarter of 2015.

PJM has filed with the FERC to add a new “multi-driver” category of transmission projects, which projects may include a combination of reliability, economic and public policy elements. Changes to the factors used in making determinations in the PJM project planning and cost-allocation processes could have significant implications for the types of projects selected and the utility customers ultimately charged for the costs of such new transmission facilities.

Capacity market design, including the RPM, remains an important focus for us. In May 2014, a federal court issued a rule that vacated a FERC Order in which the FERC had determined that demand response (DR) providers should receive full market compensation for power and held that the FERC has no jurisdiction over DR. A subsequent challenge to the participation of DR as a resource in the PJM capacity market is pending at the FERC. In addition, PJM has filed at the FERC to reset the demand curve for the RPM, as is done every three years. We are working to assure that the demand curve is set at a level that accurately reflects the cost of building a new generating unit in New Jersey. Further, in response to last winter’s polar vortex, PJM is developing a proposal to be filed with the FERC for a capacity performance product to include generators, DR and energy efficiency providers who would guarantee availability during peak winter and summer conditions, as a supplement to base capacity and with enhanced performance-based incentives and penalties. The implications of these developments could be significant for the capacity market. See Part II, Item 5. Other Information—Federal Regulation—Capacity Market Issues—PJM for additional information.

In 2014, appeals to challenge the federal court rulings that the New Jersey Long-Term Capacity Agreement Pilot Program Act to subsidize above-market new generation and a similar action taken by Maryland were unconstitutional and null and void were each denied. For additional information, refer to Part II, Item 5. Other Information—Federal Regulation—Capacity Market Issues—Long-Term Capacity Agreement Pilot Program Act.

A critical aspect of our wholesale energy marketing business is the continued retention of market-based rate (MBR) authority from the FERC for our operating subsidiaries that engage in such activities. On October 14, 2014, the FERC issued an Order that accepted our triennial market power update, concluding that our submission satisfied its requirements for retention of MBR authority.

In recent years we have been impacted by severe weather conditions, including Hurricane Irene in 2011 and Superstorm Sandy in 2012, the latter storm resulting in the highest level of customer outages in our history. For more detailed information, refer to Item 1—Note 8. Commitments and Contingent Liabilities—Superstorm Sandy. We have begun work in our gas and electric distribution systems to improve resiliency. The New Jersey Board of Public Utilities (BPU) approved the settlement of our Energy Strong Proposal in a total amount of $1.22 billion. The settlement provides for cost recovery at a 9.75% rate of return on equity on the first $1.0 billion of the investment, plus associated allowance for funds used during construction, through an accelerated recovery mechanism. We will seek recovery of the remaining $220 million of investment in PSE&G's next base rate case, which is to be filed no later than November 1, 2017. For additional information, refer to Part II, Item 5. Other Information—State Regulation—Energy Strong Program.

In September 2014, the BPU approved substantially our entire request for a determination that our storm related costs, in the total amount of $366 million, were prudently incurred and recoverable in a future base rate proceeding, subject to offset for the amount of insurance proceeds received. For additional information, refer to Item 1. Note 4. Rate Filings.

On January 1, 2014, we commenced operation of the LIPA T&D system under a twelve-year contract with opportunity to extend for an additional eight years. Also, beginning in January 2015, Power will provide fuel procurement and power management services to LIPA under separate agreements.

In the first quarter of 2014, Power discovered that it incorrectly calculated certain components of its cost-based bids for its New Jersey fossil generating units in the PJM energy market. We notified the FERC, PJM and the PJM Independent Market Monitor (IMM) of this issue. Upon discovery of the errors, we retained outside counsel to assist in the conduct of an investigation into the matter. As the investigation proceeded, additional pricing errors in the bids were identified and it was further determined that the quantity of energy that Power offered into the energy market for its fossil peaking units differed from the amount for which Power was compensated in the capacity market for those units. We informed the FERC, PJM and the IMM of these additional issues, and have corrected these errors. Power is also in the process of implementing procedures to help mitigate the risk of similar issues occurring in the future. On September 2, 2014, the FERC Staff verbally informed us that they have initiated a preliminary, non-public staff investigation into the matter. This investigation could result in the FERC seeking disgorgement of any over-collected amounts, civil penalties and non-financial remedies. It is not possible at this time to reasonably estimate the ultimate impact or predict any resulting penalties, other costs associated with this matter, or the applicability of mitigating factors. For more detailed information regarding this matter, refer to Item 1. Note 8. Commitments and Contingent Liabilities—FERC Compliance.

### Operational Excellence

We emphasize operational performance while developing opportunities in both our competitive and regulated businesses. Flexibility in our generating fleet has allowed us to take advantage of market opportunities presented during the year as we remain diligent in managing costs. In the first nine months of 2014, our

- total nuclear fleet achieved an average capacity factor of 91%, while also completing an extended outage at Salem Unit 2,
- diverse fuel mix and dispatch flexibility allowed us to generate approximately 41,300 GWh, while addressing unit outages and balancing fuel availability and price volatility, and
- construction of transmission and solar projects proceeded on schedule and within budget.

### Financial Strength

Our financial strength is predicated on a solid balance sheet, positive cash flow and reasonable risk-adjusted returns on increased investment. Our financial position remained strong during the first nine months of 2014 as we

- had cash on hand of $703 million as of September 30, 2014,
- extended the expiration dates of PSEG's $500 million and Power's $1.6 billion five-year credit facilities from 2017 to 2019, and maintained substantial liquidity,
- maintained solid investment grade credit ratings, and
- increased our indicated annual dividend for 2014 to $1.48 per share.

We expect to be able to fund our transmission projects required under PJM's reliability program, our Energy Strong program and other projects with internally generated cash and external debt financing.

### Disciplined Investment

We utilize rigorous investment criteria when deploying capital and seek to invest in areas that complement our existing business and provide reasonable risk-adjusted returns. These areas include upgrading our energy infrastructure, responding to trends in environmental protection and providing new energy supplies in domestic markets with growing demand. In the first nine months of 2014 we

- placed into service our 230 kV Burlington-Camden and 230 kV North Central Reliability transmission projects,
- made additional investments in transmission infrastructure projects,
- continued to execute our existing BPU-approved utility programs,
- completed installation of equipment to increase output and improve efficiency at our Linden combined cycle gas generating plant and continue to plan for the installation of such equipment at our other combined cycle gas units,
- acquired an equity interest with an expected investment of $100-$120 million in the 105.5 mile

PennEast pipeline to transport natural gas from eastern Pennsylvania to New Jersey, and

- acquired rights to solar energy facilities located near El Paso, Texas and Burlington, Vermont, totaling 16.6 MW which are expected to be operational in the fourth quarter of 2014.

### Future Outlook

Our future success will depend on our ability to continue to maintain strong operational and financial performance in a difficult economy and cost-constrained environment, to capitalize on or otherwise address appropriately regulatory and legislative developments and to respond to the issues and challenges described below. In order to do this, we must continue to

- focus on controlling costs while maintaining safety and reliability and complying with applicable standards and requirements,
- successfully re-contract our open supply positions,
- execute our capital investment program, including our Energy Strong program and other investments for growth that yield contemporaneous and reasonable risk-adjusted returns, while enhancing the resiliency of our infrastructure and maintaining the reliability of the service we provide to our customers,
- advocate for measures to ensure the implementation by PJM and the FERC of market design rules that continue to promote fair and efficient electricity markets,
- engage multiple stakeholders, including regulators, government officials, customers and investors, and
- successfully operate the LIPA T&D system.

For the remainder of 2014 and beyond, the key issues and challenges we expect our business to confront include

- regulatory and political uncertainty, both with regard to future energy policy, design of energy and capacity markets, transmission policy and environmental regulation, as well as with respect to the outcome of any legal, regulatory or other proceeding, settlement, investigation or claim, applicable to us and/or the energy industry,
- uncertainty in the slowly improving national and regional economic recovery, continuing customer conservation efforts, changes in energy usage patterns and evolving technologies, which impact customer behaviors and demand,
- the continuing potential for sustained lower natural gas and electricity prices, both at market hubs and at locations where we operate, and
- delays and other obstacles that might arise in connection with the construction of our T&D projects, including in connection with permitting and regulatory approvals.

### RESULTS OF OPERATIONS

### PSEG

Our results of operations are primarily comprised of the results of operations of our principal operating subsidiaries, Power and PSE&G, excluding charges related to intercompany transactions, which are eliminated in consolidation. For additional information on intercompany transactions, see Note 17. Related-Party Transactions.

|  | Three Months Ended September 30, 2014 Millions | 2013 | Increase/ (Decrease) September 30, 2014 vs. 2013 Millions% |  | Nine Months Ended 2014 Millions | 2013 | Increase/ (Decrease) 2014 vs. 2013 Millions% |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Operating Revenues | $2,641 | $2,554 | $87 | 3 | $8,113 | $7,650 | $463 | 6 |
| Energy Costs | 863 | 801 | 62 | 8 | 3,008 | 2,711 | 297 | 11 |
| Operation and Maintenance | 714 | 713 | 1 | — | 2,370 | 2,069 | 301 | 15 |
| Depreciation and Amortization | 318 | 313 | 5 | 2 | 919 | 886 | 33 | 4 |
| Taxes Other than Income Taxes | — | 15 | (15) | (100) | — | 50 | (50) | (100) |
| Income from Equity Method Investments | 3 | 4 | (1) | (25) | 10 | 9 | 1 | 11 |
| Other Income and (Deductions) | 66 | 47 | 19 | 40 | 154 | 118 | 36 | 31 |
| Other-Than-Temporary Impairments | 10 | 3 | 7 | N/A | 14 | 7 | 7 | 100 |
| Interest Expense | 100 | 100 | — | — | 291 | 303 | (12) | (4) |
| Income Tax Expense | 261 | 270 | (9) | (3) | 633 | 708 | (75) | (11) |

The 2014 amounts in the preceding table for Operating Revenues and O&M Costs each include $107 million and $307 million for the three months and nine months ended September 30, 2014, respectively, for Long Island Electric Utility Servco, LLC, a wholly owned subsidiary of PSEG LI. These amounts represent the O&M pass-through costs for the Long Island operations, the full reimbursement of which is reflected in Operating Revenues. See Note 3. Variable Interest Entities for further explanation. The following discussions for Power and PSE&G provide a detailed explanation of their respective variances.

### Power

|  | Three Months Ended September 30, 2014 Millions | 2013 | Increase/ (Decrease) September 30, 2014 vs. 2013 Millions% |  | Nine Months Ended 2014 Millions | 2013 | Increase/ (Decrease) 2014 vs. 2013 Millions% |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Operating Revenues | $1,138 | $1,174 | $(36) | (3) | $3,824 | $3,818 | $6 | — |
| Energy Costs | 472 | 430 | 42 | 10 | 2,036 | 1,785 | 251 | 14 |
| Operation and Maintenance | 242 | 305 | (63) | (21) | 871 | 868 | 3 | — |
| Depreciation and Amortization | 71 | 69 | 2 | 3 | 215 | 202 | 13 | 6 |
| Income from Equity Method Investments | 4 | 4 | — | — | 11 | 12 | (1) | (8) |
| Other Income (Deductions) | 50 | 34 | 16 | 47 | 110 | 78 | 32 | 41 |
| Other-Than-Temporary Impairments | 10 | 3 | 7 | N/A | 14 | 7 | 7 | 100 |
| Interest Expense | 31 | 26 | 5 | 19 | 92 | 85 | 7 | 8 |
| Income Tax Expense | 144 | 153 | (9) | (6) | 277 | 384 | (107) | (28) |

76

### Three Months Ended September 30, 2014 as Compared to 2013

**Operating Revenues** decreased $36 million due to changes in generation, gas supply and other operating revenues.

***Generation Revenues*** decreased $55 million due primarily to

- a decrease of $71 million due to lower capacity revenues resulting from lower average auction prices partially coupled with a decrease in operating reserve revenue in PJM in 2014, and
- a decrease of $27 million due primarily to lower volumes of electricity sold under our BGS contracts as a result of serving fewer tranches in 2014,
- partially offset by higher net revenues of $23 million due primarily to higher generation volumes at higher average realized prices in the New York (NY) region and higher MTM gains in 2014 which were partially offset by lower average realized prices in the PJM and New England (NE) regions, and
- an increase of $20 million due to higher volumes on wholesale load contracts in the PJM region.

***Gas Supply Revenues*** increased $15 million due primarily to higher sales volumes at lower average natural gas prices to third party customers.

***Other Operating Revenues*** increased $4 million due to transition fees related to the fuel and power supply management contracts with LIPA.

### Operating Expenses

**Energy Costs** represent the cost of generation, which includes fuel costs for generation as well as purchased energy in the market, and gas purchases to meet Power’s obligation under its BGSS contract with PSE&G. Energy Costs increased $42 million due to

- ***Generation costs*** increased $32 million due primarily to higher congestion costs and renewable energy credits, partially offset by the favorable MTM impact from lower average unrealized prices on forward positions.
- ***Gas costs*** increased $10 million, reflecting higher sales volumes to third party customers, partially offset by lower average gas inventory costs on obligations under the BGSS contract.

**Operation and Maintenance** decreased $63 million due primarily to

- lower planned outage costs of $39 million at our fossil stations, primarily at our BEC combined cycle gas generating plant due to maintenance on the low pressure turbine in 2013 and lower outage costs at our nuclear Peach Bottom facility,
- a decrease of $13 million due to lower storm costs related to Superstorm Sandy, and
- lower pension and OPEB expense of $14 million.

**Depreciation and Amortization** experienced no material change.

**Income from Equity Method Investments** experienced no material change.

**Other Income and (Deductions)** increased $16 million primarily due to higher net realized gains related to the NDT Fund restructuring in May 2014.

**Other-Than-Temporary Impairments** increased $7 million due to an increase in impairments on the NDT Fund.

**Interest Expense** increased $5 million due primarily to the issuance of $500 million of Senior Notes in November 2013.

**Income Tax Expense** decreased $9 million in 2014 due primarily to lower pre-tax income.

### Nine Months Ended September 30, 2014 as Compared to 2013

**Operating Revenues** increased $6 million due to changes in generation, gas supply and other operating revenues.

***Generation Revenues*** decreased $128 million due primarily to

- lower net revenues of $72 million due primarily to higher MTM losses in 2014 resulting from an increase in prices on forward positions, partially offset by higher energy volumes sold in the NY and NE regions, and
- a decrease of $70 million due to lower volumes of electricity sold under our BGS contracts as a result of serving fewer tranches in 2014 and lower average pricing,
- partially offset by a net increase of $12 million due primarily to higher capacity revenues resulting from higher average auction prices and higher ancillary revenue in the PJM region, and
- a net increase of $2 million due primarily to higher volumes on wholesale load contracts in the PJM region.

***Gas Supply Revenues*** increased $123 million due primarily to

- a net increase of $74 million in sales under the BGSS contract, substantially comprised of higher sales volume due to colder average temperatures during the 2014 winter heating season, and
- a net increase of $49 million due primarily to higher sales volumes at lower average prices to third party customers.

***Other Operating Revenues*** increased $11 million due to transition fees related to the fuel management and power supply management contracts with LIPA.

### Operating Expenses

**Energy Costs** represent the cost of generation, which includes fuel costs for generation as well as purchased energy in the market, and gas purchases to meet Power’s obligation under its BGSS contract with PSE&G. Energy Costs increased $251 million due to

- ***Generation costs*** increased $200 million due primarily to higher fuel costs, reflecting higher average realized natural gas prices, the unfavorable MTM impact from lower average unrealized natural gas prices on forward positions and the utilization of higher volumes of coal and oil.
- ***Gas costs*** increased $51 million, principally related to higher volumes sold under the BGSS contract and to third parties due to colder average temperatures during the 2014 winter heating season, partially offset by lower average gas inventory costs.

**Operation and Maintenance** increased $3 million due primarily to

- an increase of $62 million related primarily to higher planned outage and maintenance costs at our fossil plants, including maintenance and installation of upgraded technology at our Linden combined cycle gas generating plant, partially offset by lower costs at our BEC fossil station as well as lower outage costs at our nuclear Peach Bottom facility, partially offset by
- lower pension and OPEB costs of $40 million, and
- a decrease of $19 million due to lower storm costs related to Superstorm Sandy.

**Depreciation and Amortization** increased $13 million due primarily to a higher depreciable fossil and nuclear asset base.

**Income from Equity Method Investments** experienced no material change.

**Other Income and (Deductions)** increased $32 million due primarily to net losses that were incurred in March 2013 as a result of rebalancing the NDT portfolio.

**Other-Than-Temporary Impairments** increased $7 million due to an increase in impairments on the NDT Fund.

**Interest Expense** increased $7 million due primarily to the issuance of $500 million of Senior Notes in November 2013, partially offset by the maturity of $300 million of Senior Notes in April 2013.

**Income Tax Expense** decreased $107 million in 2014 due primarily to lower pre-tax income.

### PSE&G

|  | Three Months Ended September 30, 2014 Millions | 2013 | Increase/ (Decrease) September 30, 2014 vs. 2013 Millions% |  | Nine Months Ended 2014 Millions | 2013 | Increase/ (Decrease) 2014 vs. 2013 Millions% |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Operating Revenues | $1,655 | $1,666 | $(11) | (1) | $5,235 | $5,084 | $151 | 3 |
| Energy Costs | 668 | 661 | 7 | 1 | 2,278 | 2,208 | 70 | 3 |
| Operation and Maintenance | 366 | 408 | (42) | (10) | 1,190 | 1,204 | (14) | (1) |
| Depreciation and Amortization | 238 | 236 | 2 | 1 | 682 | 658 | 24 | 4 |
| Taxes Other Than Income Taxes | — | 15 | (15) | (100) | — | 50 | (50) | (100) |
| Other Income (Deductions) | 14 | 12 | 2 | 17 | 41 | 38 | 3 | 8 |
| Interest Expense | 71 | 75 | (4) | (5) | 206 | 223 | (17) | (8) |
| Income Tax Expense | 126 | 115 | 11 | 10 | 355 | 311 | 44 | 14 |

### Three Months Ended September 30, 2014 as Compared to 2013

**Operating Revenues** decreased $11 million due to changes in delivery, commodity, clause, and other operating revenues.

***Delivery Revenues*** increased $15 million due primarily to an increase in transmission revenues. The Transitional Energy Facilities Assessment (TEFA) reductions in electric and gas distribution revenues are entirely offset by the decrease in Taxes Other Than Income Taxes.

- Transmission revenues were $38 million higher due to net rate increases resulting primarily from increased capital investments.
- Electric distribution revenues decreased $22 million due primarily to lower TEFA revenue of $13 million due to elimination of the TEFA rate effective January 1, 2014 and lower sales volumes of $5 million, $3 million of lower Capital Infrastructure Program (CIP) related revenue due to the 2014 reduction in the Capital Adjustment Charge (CAC) tariff and lower revenue from Green Program Recovery Charges (GPRC) of $1 million.
- Gas distribution revenues decreased $1 million due primarily to lower TEFA revenue of $2 million due to elimination of the TEFA rate in 2014 and lower CIP related revenue of $2 million due to the 2014 reduction in the CAC tariff, partially offset by an increase of $3 million from higher sales volumes.

***Commodity Revenue*** increased $7 million due to higher Gas revenues, partially offset by lower Electric revenues. This is entirely offset with increased Energy Costs. PSE&G earns no margin on the provision of BGS and BGSS to retail customers.

- Electric revenues decreased $3 million due primarily to $17 million in lower revenues from collection of Non-Utility Generation Charges (NGC) and lower sales volumes of Non-Utility generation (NUG) energy, partially offset by $14 million in higher BGS revenues. BGS sales volumes decreased 1% due primarily to weather.
- Gas revenues increased $10 million due primarily to higher BGSS volumes of $5 million and higher BGSS prices of $5 million.

***Clause Revenues*** decreased $32 million due primarily to lower Societal Benefit Charges (SBC) of $19 million, lower Securitization Transition Charge (STC) revenues of $9 million and lower Margin Adjustment Clause (MAC) of $4 million. The change in the SBC, STC and MAC amounts were entirely offset by the amortization of Regulatory Assets and related costs in O&M, Depreciation and Amortization and Interest Expense. PSE&G does not earn margin on SBC, STC or MAC collections.

***Other Operating Revenues*** remained level with the prior period.

### Operating Expenses

**Energy Costs** increased $7 million. This is entirely offset by Commodity Revenue.

- Electric costs decreased $3 million or 1% due primarily to $9 million of lower BGS and NUG prices and $15 million in lower BGS and NUG volumes, partially offset by $21 million of increased deferred cost recovery. BGS and NUG volumes decreased 3% due primarily to customer migration to third party suppliers (TPS) and weather.
- Gas costs increased $10 million or 14% due to $5 million or 7% in higher sales volumes and $5 million or 7% in higher prices.

**Operation and Maintenance** decreased $42 million, of which the most significant components were

- a $28 million decrease in costs related to clauses due primarily to lower SBC, MAC, CIP and GPRC. Due to the nature of the SBC, MAC, CIP and GPRC clause mechanisms, these are entirely offset in revenues,
- an $18 million decrease in pension and OPEB expenses and partially offset by
- an increase in other operating expenses of $4 million.

**Depreciation and Amortization** increased $2 million due primarily to

- a $12 million increase in depreciation of additional plant in service related to increased investments in various transmission and distribution projects,
- partially offset by a $10 million decrease in amortization of Regulatory Assets.

**Taxes Other Than Income Taxes** decreased $15 million due to elimination of the TEFA rate in 2014. This is entirely offset by the reduction in electric and gas distribution revenues.

**Other Income and (Deductions)** experienced no material change.

**Interest Expense** decreased $4 million due primarily to a partial redemption of securitization debt.

**Income Tax Expense** increased $11 million due primarily to higher pre-tax income.

### Nine Months Ended September 30, 2014 as Compared to 2013

**Operating Revenues** increased $151 million due to changes in delivery, commodity, clause, and other operating revenues.

***Delivery Revenues*** increased $93 million due primarily to an increase in transmission revenues. The TEFA reductions in electric and gas distribution revenues are entirely offset by the decrease in Taxes Other Than Income Taxes.

- Transmission revenues were $115 million higher due to net rate increases resulting primarily from increased capital investments.
- Gas distribution revenues were flat due primarily to $53 million from higher sales volumes and higher revenue from GPRC of $6 million, offset by lower Weather Normalization Clause (WNC) revenue of $36 million due to colder than normal weather, lower TEFA revenue of $15 million due to elimination of the TEFA rate in 2014 and lower CIP related revenues of $8 million partially due to the 2014 reduction in the CAC tariff.
- Electric distribution revenues decreased $22 million due primarily to lower TEFA revenue of $35 million due to elimination of the TEFA rate in 2014, lower sales volumes of $7 million and lower CIP related revenues of $3 million due to the 2014 reduction in the CAC tariff, partially offset by higher revenue from the GPRC of $23 million.

***Commodity Revenue*** increased $70 million due to higher Electric and Gas revenues. This is entirely offset with increased Energy Costs. PSE&G earns no margin on the provision of BGS and BGSS to retail customers.

- Electric revenues increased $15 million due primarily to $48 million in higher volumes and prices of BGS sales, partially offset by $33 million in lower revenues from collection of NGC and lower sales volumes of NUG energy. BGS sales volumes increased 2% due primarily to weather.
- Gas revenues increased $55 million due primarily to higher BGSS volumes of $106 million, partially offset by lower BGSS prices of $51 million. The average price of natural gas was 7% lower in 2014.

***Clause Revenues*** decreased $20 million due primarily to lower STC of $12 million, lower SBC of $7 million and lower MAC of $7 million partially offset by higher Solar Pilot Recovery Charge (SPRC). The change in the STC, SBC MAC and SPRC amounts were entirely offset by the amortization of Regulatory Assets and related costs in O&M, Depreciation and Amortization and Interest Expense. PSE&G does not earn margin on STC, SBC, MAC or SPRC collections.

***Other Operating Revenues*** increased $8 million due primarily to increased revenues from our appliance repair business and miscellaneous electric operating revenues.

### Operating Expenses

**Energy Costs** increased $70 million. This is entirely offset by Commodity Revenue.

- Electric costs increased $15 million or 1% due to $72 million of increased deferred cost recovery and $2 million of higher BGS and NUG prices, partially offset by $59 million in lower BGS and NUG volumes. BGS and NUG volumes decreased 4% due primarily to customer migration to TPS.
- Gas costs increased $55 million or 8% due to $106 million or 14% in higher sales volumes, partially offset by $51 million or 6% in lower prices.

**Operation and Maintenance** decreased $14 million, of which the most significant components were

- a $55 million decrease in pension and OPEB expenses, partially offset by,
- an $11 million increase in costs related primarily to a net increase in SBC, MAC, CIP and GPRC. Due to the nature of the SBC, MAC, CIP and GPRC clause mechanisms, these are entirely offset in revenues, and
- a $30 million increase in operational expenses due primarily to storm-related costs of $7 million, damage claims of $8 million, transmission related costs of $3 million, general wage increases of $2 million, tree trimming of $2 million and general operating expenses of $8 million.

**Depreciation and Amortization** increased $24 million due primarily to a $33 million increase in depreciation of additional plant in service related to increased investments in various transmission and distribution projects, partially offset by a decrease of $11 million in amortization of Regulatory Assets.

**Taxes Other Than Income Taxes** decreased $50 million due to elimination of the TEFA rate in 2014. This is entirely offset by the reduction in electric and gas distribution revenues.

**Other Income and (Deductions)** experienced no material change.

**Interest Expense** decreased $17 million due primarily to a partial redemption of securitization debt and maturity of Medium Term Notes (MTNs) in the second half of 2013, partially offset by the issuance of MTNs in the latter part of 2013 and 2014.

**Income Tax Expense** increased $44 million due primarily to higher pre-tax income.

### LIQUIDITY AND CAPITAL RESOURCES

The following discussion of our liquidity and capital resources is on a consolidated basis, noting the uses and contributions, where material, of our two direct major operating subsidiaries.

### Operating Cash Flows

Our operating cash flows combined with cash on hand and financing activities are expected to be sufficient to fund planned capital expenditures and shareholder dividend payments.

For the nine months ended September 30, 2014, our operating cash flow increased $101 million as compared to the same period in 2013. The net change was due primarily to the net changes from Power and PSE&G as discussed below and higher federal tax payments made by the parent company in 2014.

### Power

Power’s operating cash flow decreased $204 million from $1,314 million to $1,110 million for the nine months ended September 30, 2014, as compared to the same period in 2013, primarily resulting from an increase in working capital needs, largely due to higher margin deposit requirements, partially offset by a $40 million decrease in employee benefit plan funding.

### PSE&G

PSE&G’s operating cash flow increased $294 million from $1,049 million to $1,343 million for the nine months ended September 30, 2014, as compared to the same period in 2013, due primarily to higher earnings, an increase in net regulatory liabilities related to BGS and NUG costs and overcollections in Gas Weather Normalization Charges partly offset by GPRC rate recoveries and an $80 million decrease in employee benefit plan funding.

### Short-Term Liquidity

PSEG meets its short-term liquidity requirements, as well as those of Power, primarily with cash and through the issuance of commercial paper. PSE&G maintains its own separate commercial paper program to meet its short-term liquidity requirements. Each commercial paper program is fully back-stopped by its own separate credit facilities.

The commitments under our $4.3 billion credit facilities are provided by a diverse bank group. As of September 30, 2014, our total available credit capacity was $4.1 billion.

As of September 30, 2014, no single institution represented more than 8% of the total commitments in our credit facilities.

As of September 30, 2014, our total credit capacity was in excess of our anticipated maximum liquidity requirements.

Each of our credit facilities is restricted as to availability and use to the specific companies as listed in the following table; however, if necessary, the PSEG facilities can also be used to support our subsidiaries’ liquidity needs. In April 2014, PSEG and Power amended their 2012 credit agreements ending in 2017, extending the expiration date from March 2017 to April 2019. PSEG's $500 million and Power's $1.6 billion facility amendments, resulting in total commitments of $2.1 billion, will mature in 2019.

Our total credit facilities and available liquidity as of September 30, 2014 were as follows:

| Company/Facility PSEG | As of September 30, 2014 Total Facility Millions | Usage | Available Liquidity | Expiration Date | Primary Purpose |
| --- | ---: | ---: | ---: | --- | --- |
| 5-year Credit Facility | $500 | $8 | $492 | Apr 2019 | Commercial Paper (CP) Support/Funding/Letters of Credit |
| 5-year Credit Facility (A) | 500 | — | 500 | Mar 2018 | CP Support/Funding/Letters of Credit |
| **Total PSEG** | **$1,000** | **$8** | **$992** |  |  |
| **Power** |  |  |  |  |  |
| 5-year Credit Facility | $1,600 | $76 | $1,524 | Apr 2019 | Funding/Letters of Credit |
| 5-year Credit Facility (B) | 1,000 | — | 1,000 | Mar 2018 | Funding/Letters of Credit |
| Bilateral Credit Facility | 100 | 100 | — | Sept 2015 | Letters of Credit |
| **Total Power** | **$2,700** | **$176** | **$2,524** |  |  |
| **PSE&G** |  |  |  |  |  |
| 5-year Credit Facility (C) | $600 | $14 | $586 | Mar 2018 | CP Support/Funding/Letters of Credit |
| **Total PSE&G** | **$600** | **$14** | **$586** |  |  |
| **Total** | **$4,300** | **$198** | **$4,102** |  |  |

(A) In April 2016, this facility will be reduced by $23 million.

(B) In April 2016, this facility will be reduced by $48 million.

(C) In April 2016, this facility will be reduced by $29 million.

### Long-Term Debt Financing

PSE&G has $300 million of 2.70%, Series G, Medium Term Notes maturing in May 2015.

For a discussion of our long-term debt transactions during 2014, see Note 9. Changes in Capitalization.

### Common Stock Dividends

On July 15, 2014, our Board of Directors approved a $0.37 per share common stock dividend for the third quarter of 2014. This reflects an indicated annual dividend rate of $1.48 per share. We expect to continue to pay cash dividends on our common stock; however, the declaration and payment of future dividends to holders of our common stock will be at the discretion of the Board of Directors and will depend upon many factors, including our financial condition, earnings, capital requirements of our businesses, alternate investment opportunities, legal requirements, regulatory constraints, industry practice and other factors that the Board of Directors deems relevant. For additional information related to cash dividends on our common stock, see Note 15. Earnings Per Share (EPS) and Dividends.

### Credit Ratings

If the rating agencies lower or withdraw our credit ratings, such revisions may adversely affect the market price of our securities and serve to materially increase our cost of capital and limit access to capital. Outlooks assigned to ratings are as follows: stable, negative (Neg) or positive (Pos). There is no assurance that the ratings will continue for any given period of time or that they will not be revised by the rating agencies, if, in their respective judgments, circumstances warrant. Each rating given by an agency should be evaluated independently of the other agencies' ratings. The ratings should not be construed as an indication to buy, hold or sell any security. In January 2014, Moody's upgraded PSE&G's Mortgage Bond Rating from A1 to Aa3 and its commercial paper rating from P2 to P1. PSE&G's outlook is stable. In May 2014, Moody’s published updated research reports on PSEG, PSE&G and Power and the existing ratings and outlooks were unchanged.

In May 2014, S&P published updated research reports and revised the outlook to positive from stable for Power. S&P also affirmed the senior unsecured rating of BBB+ at Power and mortgage bond rating of A at PSE&G. In October 2014, Fitch affirmed the ratings and outlooks for PSEG, PSE&G and Power.

|  | Moody’s (A) | S&P (B) | Fitch (C) |
| --- | --- | --- | --- |
| **PSEG** |  |  |  |
| Outlook | **Stable** | **Stable** | **Stable** |
| Commercial Paper | P2 | A2 | F2 |
| **Power** |  |  |  |
| Outlook | **Stable** | **Positive** | **Stable** |
| Senior Notes | Baa1 | BBB+ | BBB+ |
| **PSE&G** |  |  |  |
| Outlook | **Stable** | **Stable** | **Stable** |
| Mortgage Bonds | Aa3 | A | A+ |
| Commercial Paper | P1 | A2 | F2 |

(A) Moody’s ratings range from Aaa (highest) to C (lowest) for long-term securities and P1 (highest) to NP (lowest) for short-term securities.

(B) S&P ratings range from AAA (highest) to D (lowest) for long-term securities and A1+ (highest) to D (lowest) for short-term securities.

(C) Fitch ratings range from AAA (highest) to D (lowest) for long-term securities and F1+ (highest) to D (lowest) for short-term securities.

### CAPITAL REQUIREMENTS

We expect that all of our capital requirements over the next three years will come from a combination of internally generated funds and external debt financing. There were no material changes to our projected capital expenditures at Power and Services as compared to amounts disclosed in our 2013 Form 10-K. PSE&G has increased its total projected capital expenditures through 2016 by $295 million, including $145 million for additional transmission reliability enhancements in 2015 and $50 million and $100 million in 2015 and 2016, respectively, related to additional distribution expenditures for reliability enhancements and facility replacement.

On May 21, 2014, the BPU issued an Order approving our Energy Strong program, agreeing that PSE&G would spend $1.22 billion to protect and strengthen PSE&G's electric and gas systems against severe weather conditions over primarily a three-year period with some projects extending over five years. This amount is not included in the projected capital expenditures disclosed in our 2013 Form 10-K or in the increases reported above. See Item 5. Other Information—Energy Strong Program for additional information.

### Power

During the nine months ended September 30, 2014, Power made capital expenditures of $298 million, excluding $116 million for nuclear fuel, primarily related to various projects at its fossil and nuclear generation stations.

### PSE&G

During the nine months ended September 30, 2014, PSE&G made capital expenditures of $1.49 billion, primarily for transmission and distribution system reliability. This does not include expenditures for certain energy efficiency and renewable programs of $13 million or cost of removal, net of salvage, of $68 million, which are included in operating cash flows.

### ACCOUNTING MATTERS

For information related to recent accounting matters, see Note 2. Recent Accounting Standards.

## Market risk

As filed, 3,155 characters.

The market risk inherent in our market-risk sensitive instruments and positions is the potential loss arising from adverse changes in commodity prices, equity security prices and interest rates as discussed in the Notes to Condensed Consolidated Financial Statements. It is our policy to use derivatives to manage risk consistent with business plans and prudent practices. We have a Risk Management Committee comprised of executive officers who utilize a risk oversight function to ensure compliance with our corporate policies and risk management practices.

Additionally, we are exposed to counterparty credit losses in the event of non-performance or non-payment. We have a credit management process, which is used to assess, monitor and mitigate counterparty exposure. In the event of non-performance or non-payment by a major counterparty, there may be a material adverse impact on our financial condition, results of operations or net cash flows.

### Commodity Contracts

The availability and price of energy-related commodities are subject to fluctuations from factors such as weather, environmental policies, changes in supply and demand, state and federal regulatory policies, market rules and other events. To reduce price risk caused by market fluctuations, we enter into supply contracts and derivative contracts, including forwards, futures, swaps and options with approved counterparties. These contracts, in conjunction with physical sales and other services, help reduce risk and optimize the value of owned electric generation capacity.

### Value-at-Risk (VaR) Models

VaR represents the potential losses, under normal market conditions, for instruments or portfolios due to changes in market factors, for a specified time period and confidence level. We estimate VaR across our commodity businesses.

MTM VaR consists of MTM derivatives that are economic hedges, some of which qualify for hedge accounting. The MTM VaR calculation does not include market risks associated with activities that are subject to accrual accounting, primarily our generating facilities and some load serving activities.

The VaR models used are variance/covariance models adjusted for the change of positions with 95% and 99.5% confidence levels and a one-day holding period for the MTM activities. The models assume no new positions throughout the holding periods; however, we actively manage our portfolio.

From July through September 2014, MTM VaR remained relatively stable. The range of VaR was narrower for the three months ended September 30, 2014 as compared with the year ended December 31, 2013.

| 95% Confidence Level, Loss could exceed VaR one day in 20 days | MTM VaR Three Months Ended September 30, 2014 Millions | Year Ended December 31, 2013 |
| --- | ---: | ---: |
| Period End | $20 | $12 |
| Average for the Period | $20 | $15 |
| High | $26 | $29 |
| Low | $15 | $8 |
| **99.5% Confidence Level, Loss could exceed VaR one day in 200 days** |  |  |
| Period End | $32 | $18 |
| Average for the Period | $31 | $23 |
| High | $40 | $46 |
| Low | $24 | $13 |

See Note 10. Financial Risk Management Activities for a discussion of credit risk.

## Controls and procedures

As filed, 1,879 characters.

### Disclosure Controls and Procedures

We have established and maintain disclosure controls and procedures as defined under Rule 13a-15(e) and 15d-15(e) promulgated under the Securities Exchange Act of 1934, as amended (the “Exchange Act”) that are designed to provide reasonable assurance that information required to be disclosed in the reports that are filed or submitted under the Exchange Act is recorded, processed, summarized and reported and is accumulated and communicated to the Chief Executive Officer (CEO) and Chief Financial Officer (CFO) of each respective company, as appropriate, by others within the entities to allow timely decisions regarding required disclosure. We have established a disclosure committee which includes several key management employees and which reports directly to the CFO and CEO of each of Public Service Enterprise Group Incorporated, PSEG Power LLC, and Public Service Electric and Gas Company. The committee monitors and evaluates the effectiveness of these disclosure controls and procedures. The CFO and CEO of each of Public Service Enterprise Group Incorporated, PSEG Power LLC, and Public Service Electric and Gas Company have evaluated the effectiveness of the disclosure controls and procedures and, based on this evaluation, have concluded that disclosure controls and procedures at each respective company were effective at a reasonable assurance level as of the end of the period covered by the report.

### Internal Controls

We continually review our disclosure controls and procedures and make changes, as necessary, to ensure the quality of our financial reporting. There have been no changes in internal control over financial reporting that occurred during the third quarter of 2014 that have materially affected, or are reasonably likely to materially affect, each registrant’s internal control over financial reporting.

## Risk factors

As filed, 125 characters.

There are no additional Risk Factors to be added to those disclosed in Part I Item 1A of our 2013 Annual Report on Form 10-K.

Filed Oct 30, 2014.
Source: SEC EDGAR, the filing index for accession 0000788784-14-000013. Last ingested by Listed: Nov 6, 2026, 17:31 ET. No prices; not investment advice.