# Public Service Enterprise Group Inc: Form 10-Q for the period ended Jun 30, 2015

- Company: [Public Service Enterprise Group Inc](/companies/peg.md) (CIK 788784)
- Form: 10-Q
- Filed: 2015-07-31
- Accepted by EDGAR: Jul 31, 2015, 21:07 ET
- Period: 2015-06-30
- Accession: 0000788784-15-000008
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/788784/000078878415000008/pseg-6302015xq2.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/788784/000078878415000008/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2015-06-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2015-04-01 to 2015-06-30 | $2.31bn | us-gaap:Revenues |
| Revenue | 6 months, 2015-01-01 to 2015-06-30 | $5.45bn | us-gaap:Revenues |
| Operating income | 3 months, 2015-04-01 to 2015-06-30 | $568.0m | us-gaap:OperatingIncomeLoss |
| Operating income | 6 months, 2015-01-01 to 2015-06-30 | $1.62bn | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2015-04-01 to 2015-06-30 | $97.0m | us-gaap:InterestExpense |
| Interest expense | 6 months, 2015-01-01 to 2015-06-30 | $195.0m | us-gaap:InterestExpense |
| Income tax | 3 months, 2015-04-01 to 2015-06-30 | $186.0m | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 6 months, 2015-01-01 to 2015-06-30 | $584.0m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2015-04-01 to 2015-06-30 | $345.0m | us-gaap:NetIncomeLoss |
| Net income | 6 months, 2015-01-01 to 2015-06-30 | $931.0m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2015-04-01 to 2015-06-30 | $0.68 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 6 months, 2015-01-01 to 2015-06-30 | $1.83 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2015-04-01 to 2015-06-30 | $0.68 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 6 months, 2015-01-01 to 2015-06-30 | $1.84 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2015-04-01 to 2015-06-30 | 508,000,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 6 months, 2015-01-01 to 2015-06-30 | 508,000,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 6 months, 2015-01-01 to 2015-06-30 | $2.23bn | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 6 months, 2015-01-01 to 2015-06-30 | $1.74bn | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Dividends paid | 3 months, 2015-04-01 to 2015-06-30 | $197.0m | us-gaap:PaymentsOfDividendsCommonStock |
| Dividends paid | 6 months, 2015-01-01 to 2015-06-30 | $394.0m | us-gaap:PaymentsOfDividendsCommonStock |
| Cash and equivalents | at 2015-06-30 | $597.0m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2015-06-30 | $3.63bn | us-gaap:AssetsCurrent |
| Total assets | at 2015-06-30 | $36.21bn | us-gaap:Assets |
| Current liabilities | at 2015-06-30 | $3.11bn | us-gaap:LiabilitiesCurrent |
| Long-term debt | at 2015-06-30 | $8.69bn | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2015-06-30 | $491.0m | us-gaap:LongTermDebtCurrent |
| Shareholders' equity | at 2015-06-30 | $12.71bn | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 48,704 characters.

This combined MD&A is separately filed by Public Service Enterprise Group Incorporated (PSEG), Public Service Electric and Gas Company (PSE&G) and PSEG Power LLC (Power). Information contained herein relating to any individual company is filed by such company on its own behalf. PSE&G and Power each make representations only as to itself and make no representations whatsoever as to any other company.

PSEG's business consists of two reportable segments, our principal direct wholly owned subsidiaries, which are:

- **PSE&G,** our public utility company which primarily provides electric transmission services and distribution of electric energy and natural gas, implements demand response and energy efficiency programs and invests in solar generation in New Jersey, and
- **Power,** our wholesale energy supply company that integrates its nuclear, fossil and renewable generating asset operations with its wholesale energy, fuel supply, energy trading and marketing and risk management activities primarily in the Northeast and Mid-Atlantic United States.

PSEG's other direct wholly owned subsidiaries are: PSEG Energy Holdings L.L.C. (Energy Holdings), which earns its revenues primarily from its portfolio of lease investments; PSEG Long Island LLC (PSEG LI), which operates the Long Island Power Authority's (LIPA) transmission and distribution (T&D) system under a contractual agreement; and PSEG Services Corporation (Services), which provides us and these operating subsidiaries with certain management, administrative and general services at cost.

Our business discussion in Part I, Item 1. Business of our 2014 Annual Report on 10-K (Form 10-K) provides a review of the regions and markets where we operate and compete, as well as our strategy for conducting our businesses within these markets, focusing on operational excellence, financial strength and making disciplined investments. Our risk factor discussion in Part I, Item 1A. Risk Factors of Form 10-K provides information about factors that could have a material adverse impact on our businesses. The following supplements that discussion and the discussion included in the Executive Overview of 2014 and Future Outlook provided in Item 7 in our Form 10-K by describing significant events and business developments that have occurred during 2015 and changes to the key factors that we expect may drive our future performance. The following discussion refers to the Condensed Consolidated Financial Statements (Statements) and the Related Notes to Condensed Consolidated Financial Statements (Notes). This discussion should be read in conjunction with such Statements, Notes and the 2014 Form 10-K.

### EXECUTIVE OVERVIEW OF 2015 AND FUTURE OUTLOOK

Our business plan is designed to achieve growth while managing the risks associated with fluctuating commodity prices and changes in customer demand. We continue our focus on operational excellence, financial strength and disciplined investment. These guiding principles have provided the base from which we have been able to execute our strategic initiatives, including:

- Growing our utility operations through continued investment in T&D infrastructure projects with greater diversity of regulatory oversight, and
- Maintaining a reliable generation fleet with the flexibility to utilize a diverse mix of fuels which allows us to respond to market volatility and capitalize on opportunities as they arise.

### Financial Results

The results for PSEG, PSE&G and Power for the three months and six months ended June 30, 2015 and 2014 are presented as follows:

| Earnings | Three Months Ended June 30, 2015 Millions | 2014 | Six Months Ended June 30, 2015 | 2014 |
| --- | ---: | ---: | ---: | ---: |
| PSE&G | $167 | $151 | $409 | $365 |
| Power (A) | 166 | 54 | 501 | 218 |
| Other (B) | 12 | 7 | 21 | 15 |
| **PSEG Net Income** | **$345** | **$212** | **$931** | **$598** |
| **PSEG Net Income Per Share (Diluted)** | **$0.68** | **$0.42** | **$1.83** | **$1.18** |

(A) Includes an after-tax insurance recovery for Superstorm Sandy of $27 million and $102 million in the three months and six months ended June 30, 2015, respectively. See Note 8. Commitments and Contingent Liabilities.

(B) Other includes activities at the parent company, PSEG LI, and Energy Holdings as well as intercompany eliminations.

Power’s results above include the realized gains, losses and earnings on the Nuclear Decommissioning Trust (NDT) Fund and other related NDT activity and the impacts of non-trading mark-to-market (MTM) activity, which consist of the financial impact from positions with forward delivery dates.

The variances in our Net Income include the changes related to NDT and MTM shown in the following table:

|  | Three Months Ended June 30, 2015 Millions, after tax | 2014 | Six Months Ended June 30, 2015 | 2014 |
| --- | ---: | ---: | ---: | ---: |
| NDT Fund Income (Expense) (A) | $1 | $14 | $3 | $23 |
| Non-Trading MTM Gains (Losses) | $28 | $(42) | $8 | $(174) |

(A) NDT Fund Income (Expense) includes the realized gains and losses, interest and dividend income and other costs related to the NDT Fund which are recorded in Other Income and Deductions, and impairments on certain NDT securities recorded as Other-Than-Temporary Impairments. Interest accretion expense on Power’s nuclear Asset Retirement Obligation (ARO) is recorded in Operation and Maintenance (O&M) Expense and the depreciation related to the ARO asset is recorded in Depreciation and Amortization Expense.

Our $133 million and $333 million increases in Net Income for the three months and six months ended June 30, 2015 were driven primarily by:

- MTM gains in 2015 as compared to MTM losses in 2014,
- lower generation costs due to lower fuel costs,
- higher revenues due to increased investments in transmission projects, and
- insurance recoveries of Superstorm Sandy costs, primarily at Power.

At PSE&G, our regulated utility, we continued to invest capital in T&D and other infrastructure projects aimed at maintaining service reliability to our customers. Effective January 1, 2015, PSE&G's formula rate increased our annual transmission revenues by approximately $182 million. Each year, transmission revenues are filed based on estimated data and subject to true up with actual current year data. The true-up adjustment for 2015 will primarily include the impact on rate base due to the extension of bonus depreciation, which was enacted after the filing was made, and is estimated to reduce our 2015 annual revenue increase by approximately $21 million. Over the past few years, these types of investments have altered the business mix of our overall results of operations to reflect a higher percentage contribution by PSE&G.

Power’s results benefited from access to natural gas supplies through its existing firm pipeline transportation contracts during the cold weather experienced in the first quarter of 2015. Power manages these contracts for the benefit of PSE&G’s customers through the basic gas supply service (BGSS) arrangement. The contracts are sized to ensure delivery of a reliable gas supply to PSE&G customers on peak winter days. When pipeline capacity beyond the customers’ needs is available, Power can use it to make third party sales and supply gas to its generating units in New Jersey.

### Regulatory, Legislative and Other Developments

In our pursuit of operational excellence, financial strength and disciplined investment, we closely monitor and engage with stakeholders on significant regulatory and legislative developments. Transmission planning rules and wholesale power market design are of particular importance to our results and we continue to advocate for policies and rules that promote fair and efficient electricity markets.

### Transmission Planning

The FERC’s rule under Order 1000 altered the right of first refusal (ROFR) previously held by incumbent utilities to build transmission within their respective service territories, creating the potential that new transmission projects in our service territory could be assigned to third parties rather than PSE&G. Order 1000 also presents opportunities for us to construct transmission outside of our service territory. In April 2013, PJM Interconnection, L.L.C. (PJM) initiated a solicitation process in which we participated to review technical solutions to improve the operational performance in the Artificial Island area, consisting of our Salem and Hope Creek nuclear generation facilities. On April 28, 2015, the PJM staff advised stakeholders that it intended to recommend a transmission project that would primarily be awarded to another entity, but that a portion at an estimated construction cost of between $100 million and $130 million would be assigned to PSE&G. We subsequently filed comments with the PJM Board of Managers (PJM Board) identifying what we believed were deficiencies in the PJM staff recommendation. On July 29, 2015, the PJM Board approved the PJM staff's recommendation. See Part II. Item 5. Other Information—Transmission Regulation—Transmission Policy Developments for additional information.

### Wholesale Power Market Design

Capacity market design, including the Reliability Pricing Model (RPM) in PJM, remains an important focus for us. In May 2014, a federal court issued a rule that vacated a FERC Order in which the FERC had determined that demand response (DR) providers should receive full market compensation for power and held that the FERC has no jurisdiction over DR. The U.S. Supreme Court has accepted this case for review. The U.S. Supreme Court's decision could have a material impact on capacity market outcomes in which DR currently participates as a supply resource under FERC jurisdiction.

In a separate development of significance to the wholesale capacity market, in December 2014 PJM filed at the FERC its proposal for a capacity performance product to include generators, DR and energy efficiency providers who would need to certify their availability during emergency conditions, as a supplement to base capacity. The proposal includes enhanced performance-based incentives and penalties. On June 9, 2015, the FERC conditionally accepted the proposal. The capacity performance market design will be implemented for the 2015 base residual auction, which is scheduled to begin on August 10, 2015. It further provides generation owners with greater flexibility in submitting capacity market bids that reflect the additional costs and risks of the more rigorous performance requirements. See Part II, Item 5. Other Information—Capacity Market Issues—PJM for additional information.

### Environmental Regulation

We continue to advocate for the development and implementation of fair and reasonable rules by the U.S. Environmental Protection Agency (EPA) and state environmental regulators. In particular, the EPA’s 316(b) rule on cooling water intake could adversely impact future nuclear and fossil operations and costs. As adopted by the EPA, the rule requires that cooling water intake structures reflect the best technology available for minimizing environmental impacts. Under this standard, power facilities have the flexibility to select one of several options as their method of compliance. However, the EPA has structured the rule so that each state will continue to consider renewal permits for power facilities on a case by case basis. On June 30, 2015, the New Jersey Department of Environmental Protection (NJDEP) issued a draft New Jersey Pollutant Discharge Elimination Systems (NJPDES) permit governing cooling water intake structures for Salem. The draft permit does not require installation of cooling towers and allows Salem to continue to operate utilizing the existing once-through cooling water system. The draft permit is subject to a public notice and comment period after which the NJDEP may make revisions before issuing the final permit expected during the first half of 2016. See Part II, Item 5. Other Information—Water Pollution Control—Cooling Water Intake Structure Regulation for further information.

The EPA’s proposed greenhouse gas emissions regulations are also of potential consequence to our results. We continue to work with the FERC and other federal and state regulators, as well as industry partners, to determine the potential impact of these regulations. Clean Air Act (CAA) regulations governing hazardous air pollutants under the EPA's Maximum Achievable Control Technology rules are also of significance; however, we believe our generation business remains well-positioned for such air pollution control regulations if and when they are implemented. For additional information, see Part II, Item 5. Other

Information—Air Pollution Control—Hazardous Air Pollutants Control. In addition, state environmental regulations governing emissions from power plants also have a significant impact on our operations. In the second quarter of 2015, we retired 1,545 MW of fully depreciated combustion turbine capacity that would not be able to comply with the more stringent emission standards for high electric demand day units (HEDD) under the New Jersey HEDD regulations for nitrous oxide, which will reduce capacity revenues for this year.

### Other Developments

In the first half of 2015, we continued to make investments and seek recovery on such investments made to improve the resiliency of our gas and electric distribution system as part of our Energy Strong program that was approved by the New Jersey Board of Public Utilities (BPU) in 2014. As approved, the Energy Strong program provides for $1.22 billion of investment, with cost recovery at a 9.75% rate of return on equity on the first $1.0 billion of the investment, plus associated allowance for funds used during construction, through an accelerated recovery mechanism. We will seek recovery of the remaining $220 million of investment in PSE&G's next base rate case, which is to be filed no later than November 1, 2017.

In February 2015, we filed a petition with the BPU seeking approval of a Gas System Modernization Program (GSMP) through which we propose to invest approximately $1.6 billion over the next five years, or about $320 million per year, to modernize PSE&G’s gas systems. The matter is pending.

In June 2015, we acquired a development project to construct a 755 MW gas-fired combined cycle generating station (Keys Energy Center) in Maryland with completion expected in 2018 at an estimated investment of $825 million - $875 million.

The preliminary non-public staff investigation initiated by the FERC into Power's discovery and investigation of (i) incorrect calculations for certain components of its cost-based bids for its New Jersey fossil generating units in the PJM energy market and (ii) differences in the quantity of energy that Power offered into the energy market for its fossil peaking units from the amount for which Power was compensated in the capacity market for those units continues. Power has an ongoing process of implementing improved procedures to help mitigate the risk of similar issues occurring in the future. This investigation could result in the FERC seeking disgorgement of any over-collected amounts, civil penalties and non-financial remedies. It is not possible at this time to reasonably estimate the ultimate impact or predict any resulting penalties, other costs associated with this matter, or the applicability of mitigating factors. For more detailed information, refer to Item 1. Note 8. Commitments and Contingent Liabilities—FERC Compliance.

### Operational Excellence

We emphasize operational performance while developing opportunities in both our competitive and regulated businesses. Flexibility in our generating fleet has allowed us to take advantage of market opportunities presented during the year as we remain diligent in managing costs. In the first six months of 2015, our

- total nuclear fleet achieved an average capacity factor of 91%,
- nuclear output increased by 2.6% and combined cycle output by 20.8% as compared to the first half of 2014,
- diverse fuel mix and dispatch flexibility allowed us to generate approximately 28 TWh while addressing unit outages and balancing fuel availability and price volatility, and
- construction of transmission projects proceeded on schedule and within budget.

### Financial Strength

Our financial strength is predicated on a solid balance sheet, positive operating cash flow and reasonable risk-adjusted returns on increased investment. Our financial position remained strong during the first six months of 2015 as we

- had cash flow from operations of $2.2 billion as of June 30, 2015,
- maintained solid investment grade credit ratings,
- extended the expiration dates for approximately $2.0 billion of five-year credit facilities for PSEG, PSE&G and Power from 2018 to 2020, and
- increased our indicated annual dividend for 2015 to $1.56 per share.

We expect to be able to fund our transmission projects required under PJM's reliability program, our Energy Strong program, Keys Energy Center and other planned projects, as well as our proposed GSMP, without the issuance of new equity.

### Disciplined Investment

We utilize rigorous investment criteria when deploying capital and seek to invest in areas that complement our existing business and provide reasonable risk-adjusted returns. These areas include upgrading our energy infrastructure, responding to trends in environmental protection and providing new energy supplies in domestic markets with growing demand. In the first six months of 2015, in addition to our acquisition of the Keys Energy Center, we

- made additional investments in transmission infrastructure projects,
- secured approval to extend three Energy Efficiency Economic Stimulus subprograms to allow for $95 million of additional capital expenditures and $12 million of additional administrative expenses to provide energy efficiency assistance to hospitals, healthcare facilities and residential multi-family housing units,
- continued to execute our existing BPU-approved utility programs,
- completed the power ascension for the extended power uprate at our co-owned Peach Bottom 2 nuclear station, and
- completed installation of equipment to increase output and improve efficiency at our Bergen 2 combined cycle gas unit similar to our 2014 installation at our Linden plant.

### Future Outlook

Our future success will depend on our ability to continue to maintain strong operational and financial performance in a slow-moving economy and a cost-constrained environment, to capitalize on or otherwise address appropriately regulatory and legislative developments that impact our business and to respond to the issues and challenges described below. In order to do this, we must continue to

- focus on controlling costs while maintaining safety and reliability and complying with applicable standards and requirements,
- successfully manage our energy obligations and re-contract our open supply positions,
- execute our capital investment program, including our Energy Strong program, proposed GSMP and other investments for growth that yield contemporaneous and reasonable risk-adjusted returns, while enhancing the resiliency of our infrastructure and maintaining the reliability of the service we provide to our customers,
- effectively manage construction of our Keys Energy Center and other generation projects,
- advocate for measures to ensure the implementation by PJM and the FERC of market design and transmission planning rules that continue to promote fair and efficient electricity markets,
- engage multiple stakeholders, including regulators, government officials, customers and investors, and
- successfully operate the LIPA T&D system and manage LIPA's fuel supply and generation dispatch obligations.

For 2015 and beyond, the key issues and challenges we expect our business to confront include:

- regulatory and political uncertainty, both with regard to future energy policy, design of energy and capacity markets, transmission policy and environmental regulation, as well as with respect to the outcome of any legal, regulatory or other proceeding, settlement, investigation or claim, applicable to us and/or the energy industry,
- uncertainty in the slowly improving national and regional economic recovery, continuing customer conservation efforts, changes in energy usage patterns and evolving technologies, which impact customer behaviors and demand,
- the potential for continued reductions in demand and sustained lower natural gas and electricity prices, both at market hubs and the locations where we operate, and
- delays and other obstacles that might arise in connection with the construction of our T&D and other development projects, including in connection with permitting and regulatory approvals.

### RESULTS OF OPERATIONS

### PSEG

Our results of operations are primarily comprised of the results of operations of our principal operating subsidiaries, PSE&G and Power, excluding charges related to intercompany transactions, which are eliminated in consolidation. For additional information on intercompany transactions, see Item 1. Note 17. Related-Party Transactions.

|  | Three Months Ended June 30, 2015 Millions | 2014 | Increase/ (Decrease) June 30, 2015 vs. 2014 Millions% |  | Six Months Ended 2015 Millions | 2014 | Increase/ (Decrease) 2015 vs. 2014 Millions% |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Operating Revenues | $2,314 | $2,249 | $65 | 3 | $5,449 | $5,472 | $(23) | — |
| Energy Costs | 668 | 789 | (121) | (15) | 1,762 | 2,145 | (383) | (18) |
| Operation and Maintenance | 761 | 800 | (39) | (5) | 1,424 | 1,656 | (232) | (14) |
| Depreciation and Amortization | 317 | 295 | 22 | 7 | 647 | 601 | 46 | 8 |
| Income from Equity Method Investments | 4 | 3 | 1 | 33 | 7 | 7 | — | — |
| Other Income and (Deductions) | 66 | 52 | 14 | 27 | 102 | 88 | 14 | 16 |
| Other-Than-Temporary Impairments | 10 | 2 | 8 | N/A | 15 | 4 | 11 | N/A |
| Interest Expense | 97 | 94 | 3 | 3 | 195 | 191 | 4 | 2 |
| Income Tax Expense | 186 | 112 | 74 | 66 | 584 | 372 | 212 | 57 |

The following discussions for PSE&G and Power provide a detailed explanation of their respective variances.

### PSE&G

|  | Three Months Ended June 30, 2015 Millions | 2014 | Increase/ (Decrease) June 30, 2015 vs. 2014 Millions% |  | Six Months Ended 2015 Millions | 2014 | Increase/ (Decrease) 2015 vs. 2014 Millions% |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Operating Revenues | $1,466 | $1,435 | $31 | 2 | $3,468 | $3,580 | $(112) | (3) |
| Energy Costs | 544 | 565 | (21) | (4) | 1,436 | 1,610 | (174) | (11) |
| Operation and Maintenance | 368 | 362 | 6 | 2 | 780 | 824 | (44) | (5) |
| Depreciation and Amortization | 234 | 217 | 17 | 8 | 481 | 444 | 37 | 8 |
| Other Income (Deductions) | 18 | 13 | 5 | 38 | 35 | 27 | 8 | 30 |
| Interest Expense | 67 | 67 | — | — | 136 | 135 | 1 | 1 |
| Income Tax Expense | 104 | 86 | 18 | 21 | 261 | 229 | 32 | 14 |

### Three Months Ended June 30, 2015 as Compared to 2014

**Operating Revenues** increased $31 million due to changes in delivery, commodity, clause and other operating revenues.

***Delivery Revenues*** increased $69 million due primarily to an increase in transmission revenues.

- Transmission revenues were $49 million higher due to net rate increases resulting primarily from increased capital investments.
- Electric distribution revenues increased $13 million due primarily to higher sales volumes of $9 million and higher CIP II related revenues of $3 million due to the inclusion in base rates beginning in July 2014.
- Gas distribution revenues increased $7 million due primarily to higher Weather Normalization Clause (WNC) revenue of $6 million as a result of warmer than normal weather in the second quarter of 2015.

***Commodity Revenue*** decreased $21 million as a result of lower Gas revenues partially offset by higher Electric revenues. Commodity revenue for both electric and gas is entirely offset with decreased Energy Costs. PSE&G earns no margin on the provision of basic generation service (BGS) and BGSS to retail customers.

- Gas revenues decreased $51 million due primarily to lower BGSS prices.
- Electric revenues increased $30 million due primarily to a $41 million or 11% increase in BGS revenues due to higher sales volumes. This increase was partially offset by an $11 million reduction in revenues due to lower collections of Non-Utility Generation Charges (NGC) and lower volumes of Non-Utility Generation (NUG) energy sold at lower prices.

***Clause Revenues*** decreased $18 million due primarily to lower Societal Benefit Charges (SBC) of $12 million, lower Margin Adjustment Clause (MAC) revenue of $6 million and lower Solar Pilot Recovery Charges (SPRC) of $2 million, partially offset by higher Securitization Transition Charges (STC) of $2 million. The changes in the SBC, MAC, SPRC and STC amounts were entirely offset by the amortization of Regulatory Assets and related costs in O&M, Depreciation and Amortization and Interest Expense. PSE&G does not earn margin on SBC, MAC, SPRC or STC collections.

***Other Operating Revenues*** experienced no material change.

### Operating Expenses

**Energy Costs** decreased $21 million due to lower Gas costs partially offset by higher Electric costs. This is entirely offset by decreased Commodity Revenue.

- Gas costs decreased $51 million or 34% due to lower prices.
- Electric costs increased by $30 million or 7% due to $11 million of higher BGS and NUG prices and $37 million in higher BGS volumes. BGS volumes increased 10% due primarily to reverse customer migration. These increases were partially offset by $14 million of lower NUG volumes and $4 million of decreased deferred cost recovery.

**Operation and Maintenance** increased $6 million, of which the most significant components were

- a $9 million increase in pension and OPEB expenses,
- increased gas bad debt expense of $5 million, and
- $12 million in operating expenses, including increases of $3 million in storm damages, $3 million of higher wages, $2 million in appliance service costs and $1 million for injuries and damages,
- partially offset by a $20 million decrease in costs related to a net decrease in SBC, MAC, GPRC, SPRC and STC. Due to the nature of the SBC, MAC, SPRC and STC clause mechanisms, these are entirely offset in revenues.

**Depreciation and Amortization** increased $17 million due primarily to a $13 million increase in depreciation of additional plant in service related to increased investments in various transmission and distribution projects and an increase of $4 million in amortization of Regulatory Assets.

**Other Income and (Deductions)** increased $5 million due primarily to an increase in Allowance for Funds used During Construction (AFUDC).

**Income Tax Expense** increased $18 million due primarily to higher pre-tax income.

### Six Months Ended June 30, 2015 as Compared to 2014

**Operating Revenues** decreased $112 million due to changes in delivery, commodity, clause and other operating revenues.

***Delivery Revenues*** increased $109 million due primarily to an increase in transmission revenues.

- Transmission revenues were $82 million higher due to net rate increases resulting primarily from increased capital investments.
- Electric distribution revenues increased $14 million due primarily to higher sales volumes of $9 million and an

increase in CIP revenues of $4 million due to the inclusion of CIP II in base rates beginning in July 2014.

- Gas distribution revenues increased $13 million due primarily to $20 million from higher sales volumes outside the WNC clause, partially offset by lower WNC revenue of $9 million due to colder weather in 2015 compared to 2014.

***Commodity Revenue*** decreased $174 million due to lower Gas revenues offset partially by higher Electric revenues. Commodity revenue for both electric and gas is entirely offset with decreased Energy Costs. PSE&G earns no margin on the provision of BGS and BGSS to retail customers.

- Gas revenues decreased $200 million due primarily to lower BGSS prices of $278 million, of which $207 million was due to lower residential rates resulting from $133 million in residential bill credits and $74 million of lower commodity prices, partially offset by higher BGSS volumes of $78 million due to colder weather in 2015.
- Electric revenues increased $26 million due primarily to $58 million of higher net BGS revenues. BGS revenues increased by $87 million or 11%, due to higher sales volumes, which were partially offset by $29 million due to lower BGS prices. The increase from BGS was partially offset by $32 million in lower revenues from lower collection of NGC and lower sales prices and volumes of NUG energy.

***Clause Revenues*** decreased $47 million due primarily to lower SBC of $25 million, lower MAC revenue of $24 million and lower SPRC of $1 million, partially offset by higher STC of $3 million. The changes in the SBC, MAC, SPRC and STC amounts were entirely offset by the amortization of Regulatory Assets and related costs in O&M, Depreciation and Amortization and Interest Expense. PSE&G does not earn margin on SBC, MAC, SPRC or STC collections.

***Other Operating Revenues*** experienced no material change.

### Operating Expenses

**Energy Costs** decreased $174 million due to lower Gas costs partially offset by higher Electric costs. This is entirely offset by decreased Commodity Revenue.

- Gas costs decreased $200 million or 28% due to a $278 million or 39% decline in prices, partially offset by $78 million or 11% in higher sales volumes due to colder than normal weather.
- Electric costs increased $26 million or 3% due to a $72 million or 9% increase in BGS volumes, primarily reflecting reverse customer migration and a $23 million increase due to higher BGS and NUG prices, partially offset by $50 million of decreased deferred cost recovery and $19 million in lower NUG sales volumes.

**Operation and Maintenance** decreased $44 million, of which the most significant components were

- a $60 million decrease in costs related primarily to a net decrease in SBC, MAC, GPRC, CIP, SPRC and STC. Due to the nature of the SBC, MAC, SPRC and STC clause mechanisms, these are entirely offset in revenues.
- storm insurance recovery proceeds of $10 million,
- partially offset by an $18 million increase in pension and OPEB expenses, and
- increased gas bad debt expense of $5 million.

**Depreciation and Amortization** increased $37 million due primarily to a $28 million increase in depreciation of additional plant in service related to increased investments in various transmission and distribution projects and an increase of $10 million in amortization of Regulatory Assets.

**Other Income and (Deductions)** increased $8 million due primarily to an increase in AFUDC.

**Interest Expense** increased $1 million due primarily to net issuances of Medium Term Notes in the first half 2015 and latter half of 2014, partially offset by partial redemption of securitization debt.

**Income Tax Expense** increased $32 million due primarily to higher pre-tax income.

### Power

|  | Three Months Ended June 30, 2015 Millions | 2014 | Increase/ (Decrease) June 30, 2015 vs. 2014 Millions% |  | Six Months Ended 2015 Millions | 2014 | Increase/ (Decrease) 2015 vs. 2014 Millions% |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Operating Revenues | $1,025 | $986 | $39 | 4 | $2,750 | $2,686 | $64 | 2 |
| Energy Costs | 409 | 520 | (111) | (21) | 1,302 | 1,564 | (262) | (17) |
| Operation and Maintenance | 313 | 327 | (14) | (4) | 485 | 629 | (144) | (23) |
| Depreciation and Amortization | 75 | 72 | 3 | 4 | 151 | 144 | 7 | 5 |
| Income from Equity Method Investments | 5 | 3 | 2 | 67 | 8 | 7 | 1 | 14 |
| Other Income (Deductions) | 48 | 37 | 11 | 30 | 66 | 60 | 6 | 10 |
| Other-Than-Temporary Impairments | 10 | 2 | 8 | N/A | 15 | 4 | 11 | N/A |
| Interest Expense | 33 | 29 | 4 | 14 | 64 | 61 | 3 | 5 |
| Income Tax Expense | 72 | 22 | 50 | N/A | 306 | 133 | 173 | N/A |

### Three Months Ended June 30, 2015 as Compared to 2014

**Operating Revenues** increased $39 million due to changes in generation, gas supply and other operating revenues.

***Generation Revenues*** increased $92 million due primarily to

- higher net revenues of $112 million due primarily to MTM gains in 2015 compared to MTM losses in 2014, coupled with higher generation volumes at higher average realized sales prices in the PJM region,
- an increase of $24 million due primarily to higher volumes of electricity sold under wholesale load contracts in the PJM and New England (NE) regions, and
- an increase of $10 million due to higher volumes of electricity sold under our BGS contract,
- partially offset by a decrease of $54 million due to lower capacity revenues resulting from lower average auction prices coupled with a decrease in operating reserve revenue in the PJM region in 2015.

***Gas Supply Revenues*** decreased $55 million due primarily to

- a decrease of $24 million in sales under the BGSS contract substantially comprised of lower average sales prices, and
- a decrease of $31 million due to lower sales volumes at lower average sales prices to third party customers.

***Operating Revenues*** increased $2 million due to higher fees received from fuel management and power supply management contracts with LIPA.

### Operating Expenses

**Energy Costs** represent the cost of generation, which includes fuel costs for generation as well as purchased energy in the market, and gas purchases to meet Power’s obligation under its BGSS contract with PSE&G. Energy Costs decreased $111 million due to

- ***Generation costs*** decreased $55 million due primarily to lower fuel costs, reflecting lower average realized natural gas prices, coupled with a 2014 unfavorable MTM impact from lower average unrealized natural gas prices on forward purchases. These decreased costs were partially offset by the utilization of higher volumes of natural gas and higher congestion costs in the PJM region.
- ***Gas costs*** decreased $56 million related to lower average gas inventory costs on both obligations under the BGSS contract and sales to third parties, coupled with lower volumes sold to third parties.

**Operation and Maintenance** decreased $14 million due primarily to

- a decrease of $17 million due to insurance recovery related to Superstorm Sandy, and
- a net decrease of $17 million related to our fossil plants largely due to higher costs incurred in 2014 for planned outages and maintenance and installation of upgraded technology at our Linden combined cycle gas generating plant, partly offset by installation of upgraded technology in 2015 at our combined cycle Bergen generating plant,
- partially offset by an increase of $23 million at our nuclear facilities, primarily due to a planned outage at our 100%-owned Hope Creek nuclear plant in 2015 as compared to a planned outage at our 57%-owned Salem nuclear unit 2 in 2014.

**Depreciation and Amortization** increased $3 million due primarily to a higher depreciable fossil and nuclear asset base.

**Income from Equity Method Investments** experienced no material change.

**Other Income and (Deductions)** increased $11 million due primarily to a $28 million insurance recovery related to Superstorm Sandy partly offset by lower realized gains from the NDT Fund.

**Other-Than-Temporary Impairments** increased $8 million due to an increase in impairments of the NDT Fund.

**Interest Expense** experienced no material change.

**Income Tax Expense** increased $50 million in 2015 due primarily to higher pre-tax income.

### Six Months Ended June 30, 2015 as Compared to 2014

**Operating Revenues** increased $64 million due to changes in generation, gas supply and other operating revenues.

***Generation Revenues*** increased $200 million due primarily to

- higher net revenues of $239 million due primarily to MTM gains in 2015 compared to MTM losses in 2014, partially offset by lower energy volumes sold in the NE region at lower average realized sales prices, and
- an increase of $105 million due primarily to higher volumes of electricity sold under wholesale load contracts in the PJM and NE regions,
- partially offset by a net decrease of $153 million due primarily to lower capacity revenues resulting from lower average auction prices coupled with lower ancillary and operating reserve revenues in the PJM region.

***Gas Supply Revenues*** decreased $138 million due primarily to

- a net decrease of $71 million in sales under the BGSS contract, substantially comprised of lower average sales prices partially offset by higher sales volumes due to colder average temperatures in the 2015 winter heating season, and
- a decrease of $67 million due to lower average sales prices and volumes to third party customers.

***Other Operating Revenues*** increased $2 million due to higher fees received from fuel management and power supply management contracts with LIPA.

### Operating Expenses

**Energy Costs** represent the cost of generation, which includes fuel costs for generation as well as purchased energy in the market, and gas purchases to meet Power’s obligation under its BGSS contract with PSE&G. Energy Costs decreased $262 million due to

- ***Generation costs*** decreased $90 million due primarily to lower fuel costs, reflecting lower average realized natural gas prices and the utilization of lower volumes of oil, coupled with a 2014 unfavorable MTM impact from lower average unrealized natural gas prices on forward purchases. These decreased costs were partially offset by the utilization of higher volumes of natural gas and higher congestion costs in the PJM region.
- ***Gas costs*** decreased $172 million related to lower average gas inventory costs on both obligations under the BGSS contract and sales to third parties. This was partially offset by higher volumes sold under the BGSS contract due to colder average temperatures during the 2015 winter heating season.

**Operation and Maintenance** decreased $144 million due primarily to

- a decrease of $145 million due to insurance recoveries related to Superstorm Sandy, and
- a net decrease of $36 million related to our fossil plants largely due to higher costs incurred in 2014 for planned outage costs, including maintenance and installation of upgraded technology at our Linden combined cycle gas generating plant, partly offset by planned outage costs in 2015 at our Bethlehem Energy Center generating plant and installation of upgraded technology at our combined cycle Bergen plant,
- partially offset by an increase of $37 million at our nuclear facilities, primarily due to higher planned outage costs at our Hope Creek nuclear plant in 2015 as compared to our Salem nuclear unit 2 in 2014.

**Depreciation and Amortization** increased $7 million due primarily to a higher depreciable fossil and nuclear asset base.

**Income from Equity Method Investments** experienced no material change.

**Other Income and (Deductions)** increased $6 million due primarily to a $28 million insurance recovery related to Superstorm Sandy offset by lower realized gains from the NDT Fund.

**Other-Than-Temporary Impairments** increased $11 million due to an increase in impairments of the NDT Fund.

**Interest Expense** experienced no material change.

**Income Tax Expense** increased $173 million in 2015 due primarily to higher pre-tax income.

### LIQUIDITY AND CAPITAL RESOURCES

The following discussion of our liquidity and capital resources is on a consolidated basis, noting the uses and contributions, where material, of our two direct major operating subsidiaries.

### Operating Cash Flows

Our operating cash flows combined with cash on hand and financing activities are expected to be sufficient to fund planned capital expenditures and shareholder dividend payments.

For the six months ended June 30, 2015, our operating cash flow increased $786 million as compared to the same period in 2014. The net change was due primarily to higher tax payments in 2014 at the parent company and Energy Holdings and the net changes from PSE&G and Power as discussed below.

### PSE&G

PSE&G’s operating cash flow increased $172 million from $737 million to $909 million for the six months ended June 30, 2015, as compared to the same period in 2014, due primarily to higher earnings, a $176 million reduction in tax payments and increased customer collections of $9 million. These amounts were partially offset by a decrease of $227 million due to a change in regulatory deferrals primarily driven by the return of prior year overcollections to customers for BGSS gas costs, Gas Weather Normalization charges and Non-Utility Generation charges.

### Power

Power’s operating cash flow increased $478 million from $814 million to $1,292 million for the six months ended June 30, 2015, as compared to the same period in 2014, primarily due to higher earnings and a reduction in margin deposit requirements, partially offset by an increase of $171 million in tax payments.

### Short-Term Liquidity

PSEG meets its short-term liquidity requirements, as well as those of Power, primarily with cash and through the issuance of commercial paper. PSE&G maintains its own separate commercial paper program to meet its short-term liquidity requirements. Each commercial paper program is fully back-stopped by its own separate credit facilities.

The commitments under our $4.3 billion credit facilities are provided by a diverse bank group. As of June 30, 2015, our total available credit capacity was $4.1 billion.

As of June 30, 2015, no single institution represented more than 8% of the total commitments in our credit facilities.

As of June 30, 2015, our total credit capacity was in excess of our anticipated maximum liquidity requirements.

Each of our credit facilities is restricted as to availability and use to the specific companies as listed in the following table; however, if necessary, the PSEG facilities can also be used to support our subsidiaries' liquidity needs. Our total credit facilities and available liquidity as of June 30, 2015 were as follows:

| Company/Facility PSEG | As of June 30, 2015 Total Facility Millions | Usage | Available Liquidity | Expiration Date | Primary Purpose |
| --- | ---: | ---: | ---: | --- | --- |
| 5-year Credit Facility | $500 | $8 | $492 | Apr 2019 | Commercial Paper (CP) Support/Funding/Letters of Credit |
| 5-year Credit Facility (A) | 500 | — | 500 | Apr 2020 | CP Support/Funding/Letters of Credit |
| **Total PSEG** | **$1,000** | **$8** | **$992** |  |  |
| **PSE&G** |  |  |  |  |  |
| 5-year Credit Facility (B) | $600 | $14 | $586 | Apr 2020 | CP Support/Funding/Letters of Credit |
| **Total PSE&G** | **$600** | **$14** | **$586** |  |  |
| **Power** |  |  |  |  |  |
| 5-year Credit Facility | $1,600 | $198 | $1,402 | Apr 2019 | Funding/Letters of Credit |
| 5-year Credit Facility (C) | 1,000 | — | 1,000 | Apr 2020 | Funding/Letters of Credit |
| Bilateral Credit Facility | 100 | — | 100 | Sept 2015 | Letters of Credit |
| **Total Power** | **$2,700** | **$198** | **$2,502** |  |  |
| **Total** | **$4,300** | **$220** | **$4,080** |  |  |

(A) PSEG facility will be reduced by $23 million in April 2016 and $12 million in March 2018.

(B) PSE&G facility will be reduced by $29 million in April 2016 and $14 million in March 2018.

(C) Power facility will be reduced by $48 million in April 2016 and $24 million in March 2018.

### Long-Term Debt Financing

PSE&G has $171 million of 6.75% Mortgage Bonds maturing in January 2016. Power has $300 million of 5.50% Senior Notes maturing in December 2015.

For a discussion of our long-term debt transactions during 2015, see Note 9. Changes in Capitalization.

### Common Stock Dividends

On July 21, 2015, our Board of Directors approved a $0.39 per share common stock dividend for the third quarter of 2015. This reflects an indicated annual dividend rate of $1.56 per share. We expect to continue to pay cash dividends on our common stock; however, the declaration and payment of future dividends to holders of our common stock will be at the discretion of the Board of Directors and will depend upon many factors, including our financial condition, earnings, capital requirements of our businesses, alternate investment opportunities, legal requirements, regulatory constraints, industry practice and other factors that the Board of Directors deems relevant. For additional information related to cash dividends on our common stock, see Note 15. Earnings Per Share (EPS) and Dividends.

### Credit Ratings

If the rating agencies lower or withdraw our credit ratings, such revisions may adversely affect the market price of our securities and serve to materially increase our cost of capital and limit access to capital. Credit Ratings shown are for securities that we typically issue. Outlooks are shown for Corporate Credit Ratings (S&P) and Issuer Credit Ratings (Moody’s and Fitch) and can be Stable, Negative, or Positive. There is no assurance that the ratings will continue for any given period of time or that they will not be revised by the rating agencies, if, in their respective judgments, circumstances warrant. Each rating given by an agency should be evaluated independently of the other agencies' ratings. The ratings should not be construed as an indication to buy, hold or sell any security.

In May 2015, Moody’s published research reports on PSEG, PSE&G and Power and the existing ratings and outlooks were unchanged. In May 2015, S&P published updated research reports and revised the outlook to stable from positive for PSEG’s Corporate Credit Rating and Power’s Senior Notes. S&P also affirmed the senior unsecured rating of BBB+ at Power and the mortgage bond rating of A at PSE&G.

|  | Moody’s (A) | S&P (B) | Fitch (C) |
| --- | --- | --- | --- |
| **PSEG** |  |  |  |
| Outlook | **Stable** | **Stable** | **Stable** |
| Commercial Paper | P2 | A2 | F2 |
| **PSE&G** |  |  |  |
| Outlook | **Stable** | **Stable** | **Stable** |
| Mortgage Bonds | Aa3 | A | A+ |
| Commercial Paper | P1 | A2 | F2 |
| **Power** |  |  |  |
| Outlook | **Stable** | **Stable** | **Stable** |
| Senior Notes | Baa1 | BBB+ | BBB+ |

(A) Moody’s ratings range from Aaa (highest) to C (lowest) for long-term securities and P1 (highest) to NP (lowest) for short-term securities.

(B) S&P ratings range from AAA (highest) to D (lowest) for long-term securities and A1 (highest) to D (lowest) for short-term securities. The Corporate Credit Rating outlook does not apply to PSEG's or PSE&G's Commercial Paper Rating or PSE&G's Mortgage Bond rating.

(C) Fitch ratings range from AAA (highest) to D (lowest) for long-term securities and F1 (highest) to D (lowest) for short-term securities.

### CAPITAL REQUIREMENTS

We expect that all of our capital requirements over the next three years will come from a combination of internally generated funds and external debt financing.

In February 2015, we filed a petition with the BPU seeking authority to invest $1.6 billion over the next 5 years, or about $320 million per year, to modernize PSE&G’s gas systems.

In June 2015, we acquired a development project to construct a 755 MW gas-fired combined cycle generating station in Maryland (Keys Energy Center). We plan to start constructing this year with expected completion in 2018 at an estimated investment of $825 million - $875 million.

The estimated project expenditures related to the gas system modernization program at PSE&G and the Maryland project at Power are not included in the $8.7 billion three-year capital forecast table in our 2014 Form 10-K. There were no material changes to our projected capital expenditures at Services as compared to amounts disclosed in our 2014 Form 10-K.

### PSE&G

During the six months ended June 30, 2015, PSE&G made capital expenditures of $1,230 million, primarily for transmission and distribution system reliability. This does not include expenditures for cost of removal, net of salvage, of $58 million, which are included in operating cash flows.

### Power

During the six months ended June 30, 2015, Power made capital expenditures of $360 million, excluding $127 million for nuclear fuel, primarily related to various projects at its fossil and nuclear generation stations, including the new Maryland generating station noted above.

### ACCOUNTING MATTERS

For information related to recent accounting matters, see Note 2. Recent Accounting Standards.

## Market risk

As filed, 3,137 characters.

The risk inherent in our market-risk sensitive instruments and positions is the potential loss arising from adverse changes in commodity prices, equity security prices and interest rates as discussed in the Notes to Condensed Consolidated Financial Statements. It is our policy to use derivatives to manage risk consistent with business plans and prudent practices. We have a Risk Management Committee comprised of executive officers who utilize a risk oversight function to ensure compliance with our corporate policies and risk management practices.

Additionally, we are exposed to counterparty credit losses in the event of non-performance or non-payment. We have a credit management process, which is used to assess, monitor and mitigate counterparty exposure. In the event of non-performance or non-payment by a major counterparty, there may be a material adverse impact on our financial condition, results of operations or net cash flows.

### Commodity Contracts

The availability and price of energy-related commodities are subject to fluctuations from factors such as weather, environmental policies, changes in supply and demand, state and federal regulatory policies, market rules and other events. To reduce price risk caused by market fluctuations, we enter into supply contracts and derivative contracts, including forwards, futures, swaps and options with approved counterparties. These contracts, in conjunction with physical sales and other services, help reduce risk and optimize the value of owned electric generation capacity.

### Value-at-Risk (VaR) Models

VaR represents the potential losses, under normal market conditions, for instruments or portfolios due to changes in market factors, for a specified time period and confidence level. We estimate VaR across our commodity businesses.

MTM VaR consists of MTM derivatives that are economic hedges, some of which qualify for hedge accounting. The MTM VaR calculation does not include market risks associated with activities that are subject to accrual accounting, primarily our generating facilities and some load serving activities.

The VaR models used are variance/covariance models adjusted for the change of positions with 95% and 99.5% confidence levels and a one-day holding period for the MTM activities. The models assume no new positions throughout the holding periods; however, we actively manage our portfolio.

From April through June 2015, MTM VaR remained relatively stable. The range of VaR was narrower for the three months ended June 30, 2015 as compared with the year ended December 31, 2014.

| 95% Confidence Level, Loss could exceed VaR one day in 20 days | MTM VaR Three Months Ended June 30, 2015 Millions | Year Ended December 31, 2014 |
| --- | ---: | ---: |
| Period End | $15 | $36 |
| Average for the Period | $18 | $30 |
| High | $23 | $195 |
| Low | $12 | $14 |
| **99.5% Confidence Level, Loss could exceed VaR one day in 200 days** |  |  |
| Period End | $23 | $56 |
| Average for the Period | $28 | $46 |
| High | $36 | $306 |
| Low | $18 | $22 |

See Note 10. Financial Risk Management Activities for a discussion of credit risk.

## Controls and procedures

As filed, 1,735 characters.

### Disclosure Controls and Procedures

We have established and maintain disclosure controls and procedures as defined under Rule 13a-15(e) and 15d-15(e) promulgated under the Securities Exchange Act of 1934, as amended (the “Exchange Act”) that are designed to provide reasonable assurance that information required to be disclosed in the reports that are filed or submitted under the Exchange Act is recorded, processed, summarized and reported and is accumulated and communicated to the Chief Executive Officer (CEO) and Chief Financial Officer (CFO) of each respective company, as appropriate, by others within the entities to allow timely decisions regarding required disclosure. We have established a disclosure committee which includes several key management employees and which reports directly to the CFO and CEO of each of Public Service Enterprise Group Incorporated, Public Service Electric and Gas Company and PSEG Power LLC. The committee monitors and evaluates the effectiveness of these disclosure controls and procedures. The CFO and CEO of each of Public Service Enterprise Group Incorporated, Public Service Electric and Gas Company and PSEG Power LLC have evaluated the effectiveness of the disclosure controls and procedures and, based on this evaluation, have concluded that disclosure controls and procedures at each respective company were effective at a reasonable assurance level as of the end of the period covered by the report.

### Internal Controls

There have been no changes in internal control over financial reporting that occurred during the second quarter of 2015 that have materially affected, or are reasonably likely to materially affect, each registrant’s internal control over financial reporting.

## Risk factors

As filed, 125 characters.

There are no additional Risk Factors to be added to those disclosed in Part I Item 1A of our 2014 Annual Report on Form 10-K.

Filed Jul 31, 2015.