# Public Service Enterprise Group Inc: Form 10-Q for the period ended Mar 31, 2018

- Company: [Public Service Enterprise Group Inc](/companies/peg.md) (CIK 788784)
- Form: 10-Q
- Filed: 2018-04-30
- Accepted by EDGAR: Apr 30, 2018, 17:24 ET
- Period: 2018-03-31
- Accession: 0000788784-18-000007
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/788784/000078878418000007/pseg-3312018xq1.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/788784/000078878418000007/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2018-03-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2018-01-01 to 2018-03-31 | $2.82bn | us-gaap:Revenues |
| Operating income | 3 months, 2018-01-01 to 2018-03-31 | $832.0m | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2018-01-01 to 2018-03-31 | $103.0m | us-gaap:InterestExpense |
| Income tax | 3 months, 2018-01-01 to 2018-03-31 | $202.0m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2018-01-01 to 2018-03-31 | $558.0m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2018-01-01 to 2018-03-31 | $1.10 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2018-01-01 to 2018-03-31 | $1.11 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2018-01-01 to 2018-03-31 | 507,000,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months, 2018-01-01 to 2018-03-31 | $1.14bn | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 3 months, 2018-01-01 to 2018-03-31 | $1.05bn | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Dividends paid | 3 months, 2018-01-01 to 2018-03-31 | $227.0m | us-gaap:PaymentsOfDividendsCommonStock |
| Cash and equivalents | at 2018-03-31 | $118.0m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2018-03-31 | $2.81bn | us-gaap:AssetsCurrent |
| Total assets | at 2018-03-31 | $42.79bn | us-gaap:Assets |
| Current liabilities | at 2018-03-31 | $3.95bn | us-gaap:LiabilitiesCurrent |
| Long-term debt | at 2018-03-31 | $12.07bn | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2018-03-31 | $1.00bn | us-gaap:LongTermDebtCurrent |
| Short-term borrowings | at 2018-03-31 | $594.0m | us-gaap:CommercialPaper |
| Shareholders' equity | at 2018-03-31 | $14.10bn | us-gaap:StockholdersEquityIncludingPortionAttributableToNoncontrollingInterest |

## Management's discussion and analysis

As filed, 60,699 characters.

This combined MD&A is separately filed by Public Service Enterprise Group Incorporated (PSEG), Public Service Electric and Gas Company (PSE&G) and PSEG Power LLC (Power). Information contained herein relating to any individual company is filed by such company on its own behalf. PSE&G and Power each make representations only as to itself and make no representations whatsoever as to any other company.

PSEG’s business consists of two reportable segments, our principal direct wholly owned subsidiaries, which are:

- **PSE&G—**which is a public utility engaged principally in the transmission of electricity and distribution of electricity and natural gas in certain areas of New Jersey. PSE&G is subject to regulation by the New Jersey Board of Public Utilities (BPU) and the Federal Energy Regulatory Commission (FERC). PSE&G also invests in solar generation projects and energy efficiency and related programs in New Jersey, which are regulated by the BPU, and
- **Power—**which is a multi-regional energy supply company that integrates the operations of its merchant nuclear and fossil generating assets with its power marketing businesses and fuel supply functions through competitive energy sales in well-developed energy markets primarily in the Northeast and Mid-Atlantic United States through its principal direct wholly owned subsidiaries. In addition, Power owns and operates solar generation in various states. Power’s subsidiaries are subject to regulation by FERC, the Nuclear Regulatory Commission (NRC), the Environmental Protection Agency (EPA) and the states in which they operate.

PSEG’s other direct wholly owned subsidiaries are: PSEG Long Island LLC (PSEG LI), which operates the Long Island Power Authority’s (LIPA) transmission and distribution (T&D) system under an Operations Services Agreement; PSEG Energy Holdings L.L.C. (Energy Holdings), which primarily has investments in leveraged leases; and PSEG Services Corporation (Services), which provides certain management, administrative and general services to PSEG and its subsidiaries at cost.

Our business discussion in Part I, Item 1. Business of our 2017 Annual Report on 10-K (Form 10-K) provides a review of the regions and markets where we operate and compete, as well as our strategy for conducting our businesses within these markets, focusing on operational excellence, financial strength and making disciplined investments. Our risk factor discussion in Part I, Item 1A. Risk Factors of Form 10-K provides information about factors that could have a material adverse impact on our businesses. The following supplements that discussion and the discussion included in the Executive Overview of 2017 and Future Outlook provided in Item 7 in our Form 10-K by describing significant events and business developments that have occurred during 2018 and changes to the key factors that we expect may drive our future performance. The following discussion refers to the Condensed Consolidated Financial Statements (Statements) and the Related Notes to Condensed Consolidated Financial Statements (Notes). This discussion should be read in conjunction with such Statements, Notes and the 2017 Form 10-K.

### EXECUTIVE OVERVIEW OF 2018 AND FUTURE OUTLOOK

Our business plan is designed to achieve growth while managing the risks associated with fluctuating commodity prices and changes in customer demand. We continue our focus on operational excellence, financial strength and disciplined investment. These guiding principles have provided the base from which we have been able to execute our strategic initiatives, including:

- improving utility operations through growth in investment in T&D and other infrastructure projects designed to enhance system reliability and resiliency and to meet customer expectations and public policy objectives, and
- maintaining and expanding a reliable generation fleet with the flexibility to utilize a diverse mix of fuels which allows us to respond to market volatility and capitalize on opportunities as they arise.

### Financial Results

The results for PSEG, PSE&G and Power for the three months ended March 31, 2018 and 2017 are presented as follows:

| Earnings (Losses) | Three Months Ended March 31, 2018 Millions | 2017 |
| --- | ---: | ---: |
| PSE&G | $319 | $299 |
| Power (A) | 234 | (170) |
| Other (B) | 5 | (15) |
| **PSEG Net Income** | **$558** | **$114** |
| **PSEG Net Income Per Share (Diluted)** | **$1.10** | **$0.22** |

(A) Includes after-tax expenses of $334 million primarily for accelerated depreciation related to the early retirement of Power’s Hudson and Mercer coal/gas generation plants for the three months ended March 31, 2017. See Item 1. Note 4. Early Plant Retirements for additional information.

(B) Other includes after-tax activities at the parent company, PSEG LI, and Energy Holdings as well as intercompany eliminations. Energy Holdings recorded after-tax charges of $32 million related to its investments in NRG REMA, LLC’s (REMA) leveraged leases in the three months ended March 31, 2017. See Item 1. Note 7. Financing Receivables for additional information.

Power’s results above include the Nuclear Decommissioning Trust (NDT) Fund activity and the impacts of non-trading commodity mark-to-market (MTM) activity, which consist of the financial impact from positions with future delivery dates.

The variances in our Net Income attributable to changes related to the NDT Fund and MTM are shown in the following table:

|  | Three Months Ended March 31, 2018 Millions, after tax | 2017 |
| --- | ---: | ---: |
| NDT Fund Income (Expense) (A) (B) | $(16) | $8 |
| Non-Trading MTM Gains (Losses) (C) | $85 | $6 |

(A) NDT Fund Income (Expense) includes realized gains and losses and other-than-temporary impairments on certain NDT securities in 2018 and 2017 and unrealized gains and losses on equity securities in 2018, all of which are recorded in Net Gains (Losses) on Trust Investments. NDT Fund Income (Expense) also includes interest and dividend income and other costs related to the NDT Fund recorded in Other Income (Deductions), interest accretion expense on Power’s nuclear Asset Retirement Obligation (ARO) recorded in Operation and Maintenance (O&M) Expense and the depreciation related to the ARO asset recorded in Depreciation and Amortization (D&A) Expense.

(B) Net of tax (expense) benefit of $8 million and $(9) million for the three months ended March 31, 2018 and 2017, respectively.

(C) Net of tax (expense) benefit of $(33) million and $(4) million for the three months ended March 31, 2018 and 2017, respectively.

Our $444 million increase in Net Income for the three months ended March 31, 2018 was driven largely by

- accelerated depreciation in 2017 related to the early retirement of our Hudson and Mercer coal/gas generation units,
- charges in 2017 for estimated losses related to our leveraged lease investments,
- the favorable impact at Power from the lower federal tax rate effective January 1, 2018,
- higher net MTM gains in 2018, and
- higher transmission revenues in 2018.

During the first three months of 2018, we maintained a strong balance sheet. We continued to effectively deploy capital without the need for additional equity, while our solid credit ratings aided our ability to access capital and credit markets. The greater emphasis on capital spending for projects on which we receive contemporaneous returns at PSE&G, our regulated utility, in recent years has yielded strong results, which when combined with the cash flow generated by Power, our merchant generator and power marketer, has allowed us to increase our dividend. These actions to transition our business to meet market conditions and investor expectations reflect our multi-year, long-term approach to managing our company. Our focus has been to invest capital in T&D and other infrastructure projects aimed at maintaining service reliability to our customers and bolstering our system resiliency. At Power, we strive to improve performance and reduce costs in order to enhance the value of our generation fleet in light of low gas prices, environmental considerations and competitive market forces that reward efficiency and reliability.

At PSE&G, we continue to invest in transmission projects that focus on reliability improvements and replacement of aging infrastructure. We also continue to make investments to improve the resiliency of our gas and electric distribution system as part of our Energy Strong Program that was approved by the BPU in 2014 and to seek recovery on such investments. We are modernizing PSE&G’s gas distribution systems as part of our Gas System Modernization Program (GSMP) that was approved by the BPU in late 2015. Over the past few years, these types of investments have altered our business mix to reflect a higher percentage of earnings contribution by PSE&G.

Power manages its existing firm pipeline transportation contracts for the benefit of PSE&G’s customers through the basic gas supply service (BGSS) arrangement. The contracts are sized to provide for delivery of a reliable gas supply to PSE&G customers on peak winter days. When pipeline capacity beyond the customers’ needs is available, Power may use it to make third-party sales and supply gas to its generating units in New Jersey. Alternatively, gas supply and pipeline capacity constraints could adversely impact our ability to meet the needs of our utility customers and generating units. Power’s hedging practices and ability to capitalize on market opportunities help it to balance some of the volatility of the merchant power business. More than half of Power’s expected gross margin in 2018 relates to our hedging strategy, our expected revenues from the capacity market mechanisms and certain ancillary service payments such as reactive power.

Our investments in Keys Energy Center (Keys), Sewaren 7 and Bridgeport Harbor Station Unit 5 (BH5) reflect our recognition of the value of opportunistic growth in the Power business. These additions to our fleet both expand our geographic diversity and adjust our fuel mix and are expected to contribute to the overall efficiency of operations.

### Regulatory, Legislative and Other Developments

In our pursuit of operational excellence, financial strength and disciplined investment, we closely monitor and engage with stakeholders on significant regulatory and legislative developments. Transmission planning rules and wholesale power market design are of particular importance to our results and we continue to advocate for policies and rules that promote fair and efficient electricity markets.

### Transmission Planning

There are several matters pending before FERC and the U. S. Court of Appeals for the District of Columbia Circuit that concern the allocation of costs associated with transmission projects being constructed by PSE&G. Regardless of how these proceedings are resolved, PSE&G’s ability to recover the costs of these projects will not be affected. However, the result of these proceedings could ultimately impact the amount of costs borne by customers in New Jersey. In addition, as a basic generation service (BGS) supplier, Power provides services that include specified transmission costs. If the allocation of the costs associated with the transmission projects were to increase these BGS-related transmission costs, BGS suppliers may be entitled to recovery, subject to BPU approval. We do not believe that these matters will have a material effect on Power’s business or results of operations.

Several complaints have been filed and several remain pending at FERC against transmission owners around the country, challenging those transmission owners’ base return on equity (ROE). Certain of those complaints have resulted in decisions and others have been settled, resulting in reductions of those transmission owners’ base ROEs. The results of these other proceedings could set precedents for other transmission owners with formula rates in place, including PSE&G.

### Wholesale Power Market Design

Capacity market design, including the Reliability Pricing Model (RPM) in PJM, remains an important focus for us. During 2015, PJM implemented a new “Capacity Performance” (CP) mechanism that created a more robust capacity product with enhanced incentives for performance during emergency conditions and significant penalties for non-performance. The CP product was implemented fully in the May 2017 RPM auction for the 2020-2021 Delivery Year. Subsequent to its implementation, FERC approved changes to the CP construct that will enhance the participation of intermittent and demand response resources (seasonal resources). However, FERC recently scheduled a technical conference in response to two complaints requesting that FERC investigate the rules governing the participation of seasonal resources and extend the participation of the base resources for future auctions. We cannot predict the outcome of these matters.

In April 2018, PJM submitted two proposed alternative and mutually exclusive capacity market reforms for FERC’s approval. One option would be to implement a two-tier clearing mechanism that accommodates states’ subsidies and the other option would be to extend the existing Minimum Offer Price Rule (MOPR) to units that are receiving subsidies. We are currently evaluating these two proposals. In a related matter that is currently pending at FERC, a group of suppliers requested that FERC direct PJM to expand the currently effective MOPR to apply to certain existing units seeking subsidies. The suppliers’ request was intended to avoid a scenario where the subsidized generators would submit bids into the PJM capacity market that did not reflect their actual costs of operation and could artificially suppress capacity market prices. We are currently awaiting FERC action on the suppliers’ request and cannot predict the outcome of these proceedings.

In November 2017, PJM issued an energy price formation proposal to address a flaw in the energy market by allowing all resources selected for dispatch, both flexible and inflexible, to set price and consequently, result in prices that more accurately reflect the true cost to serve load. PJM’s proposal would allow large, inflexible units to set price. If placed into effect, this proposal will improve price formation by ensuring that the marginal costs of units serving load will be better reflected in clearing prices. We cannot predict the outcome of this matter.

### Distribution

The BPU has enacted Infrastructure Investment Program (IIP) regulations that allow utilities to construct, install, or remediate utility plant and facilities related to reliability, resiliency, and/or safety to support the provision of safe and adequate service. Under these regulations, utilities can seek authority to make specified infrastructure investments in programs extending for up to five years with accelerated cost recovery mechanisms. The BPU characterized the IIP regulations as a regulatory initiative intended to create a financial incentive for utilities to accelerate the level of investment needed to promote the timely rehabilitation and replacement of certain non-revenue producing infrastructure that enhances reliability, resiliency, and/or safety.

In July 2017, we filed a petition with the BPU for a GSMP II program, an extension of GSMP to continue to modernize our gas system. In April 2018, we reached a settlement with the BPU Staff, Division of Rate Counsel and other parties. Under the GSMP II program, PSE&G will invest $1.9 billion over five years beginning in 2019 to replace approximately 175 miles of cast iron and unprotected steel mains in addition to other improvements to the gas system. Approximately $1.6 billion will be recovered through periodic rate roll-ins, with the remaining $300 million to be recovered through a future base rate case. As part of the settlement, PSE&G agreed to file a base rate case no later than five years from the commencement of the program, to maintain a base level of gas distribution capital expenditures of $155 million and to achieve certain leak reduction targets. The ROE and certain other elements for the program will be determined in the pending base rate case proceeding.

As previously disclosed, PSE&G’s Energy Strong Program, a $1.2 billion investment program to harden and make the electric and gas distribution system more resilient, is expected to be completed during 2018. PSE&G expects to file for a five year extension and expansion of the Energy Strong Program in the second quarter of 2018. The extension would seek to continue efforts to harden the electric system against storms and make it more resilient, to implement a more proactive life cycle replacement program to modernize the electric system and to make the gas system more reliable by mitigating the impacts of potential supply curtailments. The size and duration of the Energy Strong Program extension, as well as PSE&G’s return on equity and certain other elements of the program, are subject to BPU approval.

In January 2018, PSE&G filed a distribution base rate case as required as a condition of approval of its Energy Strong Program approved by the BPU in 2014. The filing requested an approximate 1% increase in revenues and recovery of investments made to strengthen the electric and gas distribution systems. The requested increase took into account a reduction in the revenue requirement as a result of the federal corporate income tax rate reduction from 35% to 21% provided in the Tax Act, including the flow-back to customers of excess accumulated deferred income taxes. In March 2018, the BPU approved interim rate reductions for all their jurisdictional utilities, including PSE&G, reflecting the reduction in the federal corporate tax rate. The BPU approved a reduction to PSE&G’s base electric and gas revenues effective April 1, 2018 by $71 million and $43 million, respectively, on an annual basis (or about 2% combined). The refund to customers for over-collection of revenues at the higher tax rate for the January 1 to March 31, 2018 period, and the flow-back to customers of certain excess deferred income taxes will be addressed in PSE&G’s ongoing base rate case proceeding. As a result of the base rate reduction implemented on April 1, 2018, PSE&G’s requested revenue requirement in its filing will increase accordingly. PSE&G anticipates a decision by the BPU that the new base rates will go into effect in the fourth quarter of 2018.

### Energy Efficiency

In April 2018, the New Jersey Legislature approved legislation that would require the state’s electric and gas utilities to implement energy efficiency programs that would achieve energy savings of at least 2% per year for electric usage and 0.75% per year for gas usage within five years of the utility’s implementation of its BPU-approved energy efficiency programs. To meet these savings targets, energy usage reductions and peak demand reductions that result from utility and non-utility based programs and investments (including building code changes) will be counted. The specific energy savings target for each public electric and gas utility will be determined from an energy efficiency study to be completed within a year from enactment of the legislation. The legislation will require utilities to make filings with the BPU outlining their planned investments and proposed programs for cost-effectively achieving the targeted energy savings. These filings are also expected to address the utility’s return of and on those investments and recovery of lost revenues associated with the lower sales. PSE&G cannot predict whether the legislation will be enacted. If enacted, the BPU will issue rules to implement the legislation. PSE&G is evaluating opportunities to broaden its existing energy efficiency programs to achieve New Jersey’s targeted results, as well as make investments to facilitate the development of the electric vehicle market and a pilot program for energy storage investments.

### Environmental Regulation

We continue to advocate for the development and implementation of fair and reasonable rules by the EPA and state environmental regulators. In particular, section 316(b) of the Federal Water Pollution Control Act requires that cooling water intake structures, which are a significant part of the generation of electricity at steam-electric generating stations, reflect the best technology available for minimizing adverse environmental impacts. Implementation of Section 316(b) and related state regulations could adversely impact future nuclear and fossil operations and costs.

In March 2017, the President of the United States issued an Executive Order that instructed the EPA to review the New Source Performance Standards that establish emissions standards for CO2 for certain new fossil power plants, and the Clean Power Plan (CPP), a greenhouse gas emissions regulation under the Clean Air Act for existing power plants that establishes state-specific emission rate targets based on implementation of the best system of emission reduction. In October 2017, the EPA Administrator signed a proposed repeal of the CPP. The EPA Administrator concluded that the CPP exceeds the EPA’s statutory authority by considering measures that are beyond the control of the owners of the affected sources (fossil fuel-fired electric generating units). The EPA is considering rulemaking to replace the CPP. PSEG cannot assess the impact of any such rulemaking on its business and future results of operations at this time.

We are subject to liability under environmental laws for the costs of remediating environmental contamination of property now or formerly owned by us and of property contaminated by hazardous substances that we generated. In particular, the historic operations of PSEG companies and the operations of numerous other companies along the Passaic and Hackensack Rivers are alleged by Federal and State agencies to have discharged substantial contamination into the Passaic River/Newark Bay Complex in violation of various statutes. We are also currently involved in a number of proceedings relating to sites where other hazardous substances may have been discharged and may be subject to additional proceedings in the future, and the costs of any such remediation efforts could be material.

For further information regarding the matters described above, as well as other matters that may impact our financial condition and results of operations, see Item 1. Note 10. Commitments and Contingent Liabilities.

### FERC Compliance

In the first quarter of 2014, Power discovered that it incorrectly calculated certain components of its cost-based bids for its New Jersey fossil generating units in the PJM energy market. Upon discovery of the errors, PSEG retained outside counsel to assist in the conduct of an investigation into the matter and self-reported the errors. As the internal investigation proceeded, additional pricing errors in the bids were identified. It was further determined that the quantity of energy that Power offered into the energy market for its fossil peaking units differed from the amount for which Power was compensated in the capacity market for those units. PSEG informed FERC, PJM and the PJM Independent Market Monitor (IMM) of these additional issues, corrected the identified errors, and modified the bid quantities for Power’s peaking units. Power has implemented procedures and continues to review its policies and practices to mitigate the risk of similar issues occurring in the future.

Since September 2014, FERC Staff has been conducting a preliminary, non-public staff investigation into these matters. In April 2018, a settlement agreement was entered into between PSEG and FERC Staff, approved by FERC on April 25, 2018, pursuant to which PSEG agreed to pay approximately $40 million for the full resolution of this matter. Accordingly, Power recorded an additional pre-tax charge to income of $5 million in the first quarter of 2018, resulting in a total liability of approximately $40 million accrued for the resolution of this matter. The settlement agreement does not require PSEG to change its business practices in a manner that would have a material impact on its ongoing business operations.

### Early Retirement of Hudson and Mercer Units

On June 1, 2017, Power completed its previously announced retirement of the generation operations of the existing coal/gas units at the Hudson and Mercer generating stations. The decision to retire the Hudson and Mercer units had a material effect on PSEG’s and Power’s results of operations in 2016 and continued to adversely impact their results of operations in 2017. As of June 1, 2017, Power completed recognition of the incremental Depreciation and Amortization (D&A) of $938 million ($964 million in total) due to the significant shortening of the expected economic useful lives of Hudson and Mercer. See Item 1. Note 4. Early Plant Retirements for additional information.

Power is exploring various opportunities with these sites, including using the sites for alternative industrial activity or the disposition of one or both of the sites. If Power determines not to use the sites for alternative industrial activity, the early retirement of the units at such sites would trigger obligations under certain environmental regulations, including possible remediation. The amounts for any such remediation are neither currently probable nor estimable but may be material.

In addition, PSEG and Power continue to monitor their other coal assets, including the Keystone and Conemaugh generating stations, to assess their economic viability through the end of their designated useful lives and their continued classification as held for use. The precise timing of a change in useful lives may be dependent upon events out of PSEG’s and Power’s control and may impact their ability to operate or maintain certain assets in the future. These generating stations may be impacted by factors such as environmental legislation, co-owner capital requirements and continued depressed wholesale power prices or capacity factors, among other things. Any early retirement or change in the classification as held for use of our remaining coal units may have a material adverse impact on PSEG’s and Power’s future financial results.

### Nuclear

Since 2013, several nuclear generating stations in the United States have closed or announced early retirement due to economic reasons, or have announced being at risk for early retirement. In February 2018, Exelon, a co-owner of the Salem units, announced its intention to accelerate the closure of its Oyster Creek nuclear plant located in New Jersey, one year earlier than previously planned for economic reasons. In addition, First Energy announced in March 2018 the early retirement of four nuclear units at the Davis-Besse, Perry Nuclear and Beaver Valley nuclear plants in Ohio and Pennsylvania by 2021. These closures and retirements are generally due to the decline in market prices of energy, resulting from low natural gas prices driven by the growth of shale gas production since 2007, the continuing cost of regulatory compliance and enhanced security for nuclear facilities, both federal and state-level policies that provide financial incentives to construct renewable energy such as wind and solar and the failure to adequately compensate nuclear generating stations for the attributes they bring similar to renewable energy production. These trends have significantly reduced the revenues of nuclear generating stations while limiting their ability to reduce the unit cost of production. This may result in the electric generation industry experiencing a further shift from nuclear generation to natural gas-fired generation, creating less diversity of the generation fleet.

In the ordinary course, management, and in the case of the Salem units the co-owner, each makes a number of decisions that impact the operation of our nuclear units beyond the current year, including whether and to what extent these units participate in RPM capacity auctions, commitments relating to refueling outages and significant capital expenditures, and decisions regarding our hedging arrangements. When considering whether to make these future commitments, management’s decisions will primarily be influenced by the financial outlook of the units, including the progress, timing and continued outlook for enactment of proposed legislation in the state of New Jersey. At a co-owners meeting in February 2018, Exelon and Power agreed to cancel the funding of future capital projects at the Salem generating station that are not required to meet NRC or other regulatory requirements or that are not required to ensure its safe operation. The companies agreed that the funding of these projects may be restored when and if legislation is enacted in New Jersey that sufficiently values the attributes of nuclear generation and Salem benefits from such legislation.

If any or all of the Salem and Hope Creek units were shut down, it would significantly alter New Jersey’s energy supply predominately by increasing New Jersey’s reliance on natural gas generation. Such a decrease in fuel diversity could also increase the market’s vulnerability to price fluctuations and power disruptions in times of high demand. In April 2018, the New Jersey Legislature voted to pass legislation that would provide a safety net in order to prevent the loss of environmental attributes from selected nuclear generating stations. Power cannot predict whether the legislation will be enacted or, if enacted, whether our nuclear generating stations in New Jersey will be selected or whether the legislation will provide a sufficient safety net for the continued operation of nuclear generating stations in New Jersey.

If market prices continue to be depressed and legislation is not enacted that adequately compensates nuclear generating stations for their attributes, Power anticipates it will no longer be covering its costs nor be adequately compensated for its market and operational risks at the Salem and Hope Creek nuclear units and would anticipate retiring these units early. The costs associated with any such retirement, which may include, among other things, accelerated depreciation and amortization or impairment charges, accelerated asset retirement costs, severance costs, environmental remediation costs and additional funding of the NDT Fund would be material to both PSEG and Power.

### Leveraged Lease Impairments

GenOn Energy, Inc. (GenOn) and certain of its subsidiaries filed voluntary petitions for relief under Chapter 11 of the United States Bankruptcy Code on June 14, 2017. REMA was not included in the GenOn bankruptcy filing. GenOn is currently engaged in a balance sheet restructuring, which will take an undetermined time to complete. PSEG cannot predict the outcome of GenOn’s efforts to restructure its balance sheet and improve its liquidity.

PSEG continues to monitor any changes to REMA’s and GenOn’s status and potential impacts on Energy Holdings’ lease investments, which could include further write-downs of the values of Energy Holdings’ leveraged lease receivables, and continue to discuss the situation with various parties relevant to this matter. For additional information, see Item 1. Note 7. Financing Receivables. There can be no assurance that a continuation or worsening of the adverse economic conditions would not lead to additional write-downs at any of our other generation units in our leveraged lease portfolio, and such write-downs could be material.

Additional facilities in our leveraged lease portfolio include the Joliet and Powerton generating facilities. Converted natural gas units such as Shawville and Joliet may have higher operating costs and fuel consumption as well as longer start-up times compared to newer combined cycle gas units. Powerton is a coal-fired generating facility in Illinois. Each of these three facilities may not be as economically competitive as newer combined cycle gas units and could continue to be adversely impacted by the same economic conditions experienced by other less efficient natural gas and coal generation facilities, which could require Energy Holdings to write down the residual value of the leveraged lease receivables associated with these facilities.

### Tax Legislation

In December 2017, the U.S. government enacted comprehensive tax legislation (Tax Act), which, among other things, decreased the statutory U.S. corporate income tax rate from a maximum of 35% to 21%, effective January 1, 2018, and made certain changes to bonus depreciation rules.

As a result of the enacted reduction in the statutory U.S. corporate income tax rate, as well as other aspects of the Tax Act, in December 2017 PSE&G recorded excess deferred taxes of approximately $2.1 billion and recorded an approximate $2.9 billion revenue impact of these excess deferred taxes as Regulatory Liabilities where it is probable that refunds will be made to customers in future rates. The amount and timing of any such refund cannot be determined at this time.

Beginning in 2018, PSEG, on a consolidated basis, is incurring lower income tax expense resulting in a decrease in its projected effective income tax rate. This is also expected to increase PSEG’s and Power’s net income. To the extent allowed under the Tax Act, Power’s operating cash flows will reflect the full expensing of capital investments for income tax purposes. PSEG and Power expect that the interest on their debt will continue to be fully tax deductible albeit at a lower tax rate. For PSE&G, the Tax Act is expected to lead to lower customer rates due to lower income tax expense recoveries and the refund of deferred income tax regulatory liabilities, partially offset by the impacts of higher rate base. The impact of the lower federal income tax rate on PSE&G was reflected in PSE&G’s recently filed distribution base rate case and its 2018 transmission formula rate filings. The Tax Act is generally expected to result in lower operating cash flows for PSE&G resulting from the elimination of bonus depreciation, partially offset by higher revenues due to the higher rate base. Due to the recent enactment of the Tax Act, the full impact of these and other provisions of the Tax Act cannot be determined at this time.

The impact of the Tax Act may differ from these estimates, possibly materially, due to, among other things, changes in interpretations and assumptions PSEG has made, guidance that may be issued and actions PSEG may take as a result of the Tax Act. For additional information, see Item 1. Note 15. Income Taxes.

As a result of the enactment of the Tax Act, various state regulatory authorities, including the BPU, have taken action to ensure that excess federal income taxes previously collected in rates are returned to customers. We have made filings to adjust the revenue requirement in certain of our rate matters as a result of the change in the federal income tax rate. We continue to assess whether we need to take any further action at this time.

In addition, FERC continues to assess whether, and if so how, it will address changes and flow-backs to customers relating to accumulated deferred income taxes and bonus depreciation. See Item 1. Note 6. Rate Filings for additional information.

### Operational Excellence

We emphasize operational performance while developing opportunities in both our competitive and regulated businesses. Flexibility in our generating fleet has allowed us to take advantage of opportunities in a rapidly evolving market as we remain diligent in managing costs. For the first three months of 2018, our

- utility, beginning with comprehensive storm preparation, efficiently and safely completed our customer restorations and then assisted neighboring utilities with their restoration efforts,
- diverse fuel mix and dispatch flexibility allowed us to generate approximately 13 terawatt hours while addressing fuel availability and price volatility, and
- total nuclear fleet achieved an average capacity factor of 99.5%.

### Financial Strength

Our financial strength is predicated on a solid balance sheet, positive operating cash flow and reasonable risk-adjusted returns on increased investment. Our financial position remained strong during the first three months of 2018 as we

- maintained sufficient liquidity,
- maintained solid investment grade credit ratings, and
- increased our indicative annual dividend for 2018 to $1.80 per share.

We expect to be able to fund our planned capital requirements and manage the impacts of the Tax Act without the issuance of new equity.

### Disciplined Investment

We utilize rigorous investment criteria when deploying capital and seek to invest in areas that complement our existing business and provide reasonable risk-adjusted returns. These areas include upgrading our energy infrastructure, responding to trends in environmental protection and providing new energy supplies in domestic markets with growing demand. In the first three months of 2018, we

- made additional investments in transmission infrastructure projects,
- continued to execute our GSMP, Energy Strong, Energy Efficiency and other existing BPU-approved utility programs, and
- continued construction of our Keys and Sewaren 7 generation projects for targeted commercial operation in 2018 and our BH5 generation project for targeted commercial operation in mid-2019.

### Future Outlook

Our future success will depend on our ability to continue to maintain strong operational and financial performance in a slow-growing economy and a cost-constrained environment with low gas prices, to capitalize on or otherwise address appropriately regulatory and legislative developments that impact our business and to respond to the issues and challenges described below. In order to do this, we must continue to:

- focus on controlling costs while maintaining safety and reliability and complying with applicable standards and requirements,
- successfully manage our energy obligations and re-contract our open supply positions in response to changes in demand,
- execute our utility capital investment program, including our Energy Strong Program, GSMP and other investments for growth that yield contemporaneous and reasonable risk-adjusted returns, while enhancing the resiliency of our infrastructure and maintaining the reliability of the service we provide to our customers, and obtain approval for the extension of these programs,
- effectively manage construction of our Keys, Sewaren 7, BH5 and other generation projects,
- advocate for measures to ensure the implementation by PJM and FERC of market design and transmission planning rules that continue to promote fair and efficient electricity markets,
- engage multiple stakeholders, including regulators, government officials, customers and investors, and
- successfully operate the LIPA T&D system and manage LIPA’s fuel supply and generation dispatch obligations.

For 2018 and beyond, the key issues and challenges we expect our business to confront include:

- regulatory and political uncertainty, both with regard to future energy policy, design of energy and capacity markets, transmission policy and environmental regulation, as well as with respect to the outcome of any legal, regulatory or other proceeding, settlement, investigation or claim, applicable to us and/or the energy industry,
- fair and timely rate relief from the BPU and FERC for recovery of costs and return on investments, including with respect to our distribution base rate case which was filed with the BPU in January 2018,
- continuing discussions regarding the restructuring of GenOn and REMA and its potential impact on the value of our Keystone, Conemaugh and Shawville leveraged leases,
- the continuing impacts of the Tax Act,
- national and regional economic conditions, continuing customer conservation efforts, changes in energy usage patterns and evolving technologies, which impact customer behaviors and demand,
- the potential for continued reductions in demand and sustained lower natural gas and electricity prices, both at market hubs and the locations where we operate,
- the impact of lower natural gas prices and increasing environmental compliance costs on the competitiveness of our nuclear and remaining coal-fired generation plants, and the potential for retirement of such plants earlier than their current useful lives,
- delays and other obstacles that might arise in connection with the construction of our T&D, generation and other development projects, including in connection with permitting and regulatory approvals, and
- maintaining a diverse mix of fuels to mitigate risks associated with fuel price volatility and market demand cycles.

Our primary investment opportunities are in two areas: our regulated utility business and our merchant power business. We continually assess a broad range of strategic options to maximize long-term stockholder value. In assessing our options, we consider a wide variety of factors, including the performance and prospects of our businesses; the views of investors, regulators and rating agencies; our existing indebtedness and restrictions it imposes; and tax considerations, among other things. Strategic options available to us include:

- the acquisition, construction or disposition of T&D facilities and/or generation units,
- the disposition or reorganization of our merchant generation business or other existing businesses or the acquisition or development of new businesses,
- the expansion of our geographic footprint,
- continued or expanded participation in solar, demand response and energy efficiency programs, and
- investments in capital improvements and additions, including the installation of environmental upgrades and retrofits, improvements to system resiliency, modernizing existing infrastructure and participation in transmission projects through FERC’s “open window” solicitation process.

Power is developing a retail energy business to sell energy, which we believe complements our existing wholesale marketing business. Power began these marketing activities in 2017 and has been granted retail energy supplier licenses in New Jersey, Pennsylvania and Maryland.

There can be no assurance, however, that we will successfully develop and execute any of the strategic options noted above, or any additional options we may consider in the future. The execution of any such strategic plan may not have the expected benefits or may have unexpected adverse consequences.

### RESULTS OF OPERATIONS

### PSEG

Our results of operations are primarily comprised of the results of operations of our principal operating subsidiaries, PSE&G and Power, excluding charges related to intercompany transactions, which are eliminated in consolidation. For additional information on intercompany transactions, see Item 1. Note 19. Related-Party Transactions.

|  | Three Months Ended March 31, 2018 Millions | 2017 | Increase/ (Decrease) 2018 vs. 2017 Millions% |  |
| --- | ---: | ---: | ---: | ---: |
| Operating Revenues | $2,818 | $2,591 | $227 | 9 |
| Energy Costs | 952 | 868 | 84 | 10 |
| Operation and Maintenance | 754 | 717 | 37 | 5 |
| Depreciation and Amortization | 280 | 828 | (548) | (66) |
| Income from Equity Method Investments | 2 | 3 | (1) | (33) |
| Net Gains (Losses) on Trust Investments | (22) | 28 | (50) | N/A |
| Other Income (Deductions) | 32 | 32 | — | — |
| Non-Operating Pension and OPEB Credits (Costs) | 19 | — | 19 | N/A |
| Interest Expense | 103 | 98 | 5 | 5 |
| Income Tax Expense | 202 | 29 | 173 | N/A |

72

The following discussions for PSE&G and Power provide a detailed explanation of their respective variances.

### PSE&G

|  | Three Months Ended March 31, 2018 Millions | 2017 | Increase/ (Decrease) 2018 vs. 2017 Millions% |  |
| --- | ---: | ---: | ---: | ---: |
| Operating Revenues | $1,845 | $1,826 | $19 | 1 |
| Energy Costs | 782 | 762 | 20 | 3 |
| Operation and Maintenance | 391 | 370 | 21 | 6 |
| Depreciation and Amortization | 190 | 171 | 19 | 11 |
| Net Gains (Losses) on Trust Investments | — | 2 | (2) | N/A |
| Other Income (Deductions) | 20 | 22 | (2) | (9) |
| Non-Operating Pension and OPEB Credits (Costs) | 15 | (2) | 17 | N/A |
| Interest Expense | 81 | 75 | 6 | 8 |
| Income Tax Expense | 117 | 171 | (54) | (32) |

### Three Months Ended March 31, 2018 as Compared to 2017

**Operating Revenues** increased $19 million due to changes in delivery, commodity, clause and other operating revenues.

***Delivery Revenues*** increased $7 million due primarily to an increase in transmission revenues.

- Transmission revenues were $8 million higher due to higher revenue requirements calculated through our transmission formula rate, primarily to recover required investments.
- Gas distribution revenues increased $5 million due to a $17 million increase from the inclusion of the GSMP in base rates, and a $7 million increase due to higher sales volumes. These increases were partially offset by a $19 million decrease in Weather Normalization collections.
- Electric distribution revenues decreased $6 million due to $7 million in lower sales volumes and lower Green Program Recovery Charges of $1 million, partially offset by a $2 million increase from the Energy Strong Program in base rates.

***Commodity Revenues*** increased $20 million as a result of higher Electric revenues partially offset by lower Gas revenues. The changes in Commodity revenues for both electric and gas are entirely offset by the changes in Energy Costs. PSE&G earns no margin on the provision of BGS and BGSS to retail customers.

- Electric commodity revenues increased $34 million due primarily to a $29 million increase in BGS revenues due to $21 million in higher sales volumes and $8 million from higher prices, a $3 million increase from sales of solar renewable energy credits and $2 million of higher revenues from collections of Non-Utility Generation Charges.
- Gas commodity revenues decreased $14 million due to lower BGSS sales prices of $32 million, partially offset by higher BGSS sales volumes of $18 million.

***Clause Revenues*** decreased $11 million due primarily to a $6 million decrease in Margin Adjustment Clause (MAC) revenues and lower Societal Benefit Charges (SBC) of $5 million. The changes in the MAC and SBC amounts are entirely offset by changes in the amortization of Regulatory Assets and Regulatory Liabilities and related costs in O&M, D&A and Interest Expense. PSE&G does not earn margin on MAC or SBC collections.

### Operating Expenses

**Energy Costs** increased $20 million. This is entirely offset by the change in Commodity Revenues.

**Operation and Maintenance** increased $21 million, primarily due to a $10 million increase in transmission operating expenses, a $6 million increase in winter storm costs, a $5 million increase in appliance service costs, a $5 million increase in the gas distribution tariff, a $3 million increase in renewables and a $5 million increase in other operating expenses. These increases were partially offset by a $13 million reduction in clause-related expenditures.

**Depreciation and Amortization** increased $19 million due primarily to an $18 million increase in depreciation due to additional plant in service and an increase of $2 million in amortization of Regulatory Assets.

**Non-Operating Pension and OPEB Credits (Costs)** reflected an increase of $17 million in credits due the adoption of new accounting guidance effective January 1, 2018 which no longer allows capitalization of any portion of these benefit costs. See Item 1. Note 2. Recent Accounting Standards.

**Interest Expense** increased $6 million due primarily to debt issuances in May and December 2017.

**Income Tax Expense** decreased $54 million due primarily to the decrease in the federal statutory income tax rate from 35% in 2017 to 21% in 2018, partially offset by uncertain tax positions and plant-related items.

### Power

|  | Three Months Ended March 31, 2018 Millions | 2017 | Increase/ (Decrease) 2018 vs. 2017 Millions% |  |
| --- | ---: | ---: | ---: | ---: |
| Operating Revenues | $1,403 | $1,269 | $134 | 11 |
| Energy Costs | 746 | 692 | 54 | 8 |
| Operation and Maintenance | 246 | 232 | 14 | 6 |
| Depreciation and Amortization | 82 | 650 | (568) | (87) |
| Income from Equity Method Investments | 2 | 3 | (1) | (33) |
| Net Gains (Losses) on Trust Investments | (22) | 19 | (41) | N/A |
| Other Income (Deductions) | 11 | 11 | — | — |
| Non-Operating Pension and OPEB Credits (Costs) | 4 | 2 | 2 | 100 |
| Interest Expense | 7 | 16 | (9) | (56) |
| Income Tax Expense (Benefit) | 83 | (116) | 199 | N/A |

### Three Months Ended March 31, 2018 as Compared to 2017

**Operating Revenues** increased $134 million due to changes in generation and gas supply revenues.

***Generation Revenues*** increased $140 million due primarily to

- an increase of $134 million due to higher MTM gains in 2018 as compared to 2017. Of this amount, $112 million was due to higher gains on positions reclassified to realized upon settlement coupled with a $22 million increase due to changes in forward prices,
- a net increase of $10 million due primarily to higher volumes of electricity sold under wholesale load contracts in the PJM region offset by lower volumes of electricity sold under wholesale load contracts in the New England (NE) region, and
- a net increase of $7 million in capacity revenues due primarily to increases in cleared capacity auction prices in the NE region,
- partially offset by a net decrease of $13 million in energy sales due primarily to lower volumes and lower average realized prices in the PJM region offset by higher average prices in the NE and New York (NY) regions, and
- a decrease of $9 million in electricity sold under our BGS contracts due primarily to lower prices offset by higher volumes.

***Gas Supply Revenues*** decreased $6 million due primarily to

- a decrease of $13 million due to MTM losses in 2018 as compared to gains in 2017, and
- a decrease of $12 million related to sales to third parties due to lower average sales prices,
- partially offset by an increase of $19 million in sales under the BGSS contract due primarily to an increase in sales volumes due to colder average temperatures in the 2018 winter heating season.

### Operating Expenses

**Energy Costs** represent the cost of generation, which includes fuel costs for generation as well as purchased energy in the market, and gas purchases to meet Power’s obligation under its BGSS contract with PSE&G. Energy Costs increased $54 million due to

***Generation costs*** increased $43 million due primarily to

- higher fuel costs of $46 million reflecting utilization of higher volumes of oil in the PJM region coupled with utilization of higher volumes and higher prices of natural gas in the NY region, and
- an increase of $10 million due to MTM losses in 2018 as compared to gains in 2017. Of this amount, $6 million was due to changes in forward prices coupled with an increase of $4 million due to higher losses on positions reclassified to realized upon settlement in 2018,
- partially offset by a net decrease of $15 million primarily due to a decrease in energy purchase volumes in the NE region to serve load obligations.

***Gas costs*** increased $11 million due mainly to

- an increase of $29 million related to sales under the BGSS contract due primarily to increased volumes sold, coupled with higher average gas costs due to colder average temperatures during the 2018 winter heating season,
- partially offset by a decrease of $18 million related to sales to third parties due primarily to lower average gas costs and a decrease in volumes sold.

**Operation and Maintenance** increased $14 million due primarily to

- a $10 million net increase at our fossil plants, due primarily to higher planned outage costs in 2018 as compared to 2017, and
- a $5 million net increase due primarily to higher planned outage costs at our 100%-owned Hope Creek nuclear plant in 2018 as compared to planned outage costs incurred in 2017 for our 57%-owned Salem Unit 2.

**Depreciation and Amortization** decreased $568 million due primarily to

- $574 million of higher depreciation in 2017 for Hudson and Mercer due to the early retirement of those units,
- partially offset by a $5 million increase in 2018 due to a higher nuclear asset base primarily from increased capitalized asset retirement costs.

**Net Gains (Losses) on Trust Investments** decreased $41 million due primarily to the inclusion in 2018 of $34 million of net unrealized losses on equity investments in the NDT Fund in accordance with new accounting guidance and a $5 million decrease in net realized gains on NDT Fund investments.

**Interest Expense** decreased $9 million due primarily to higher interest capitalized for the construction of the BH5, Sewaren 7 and Keys fossil stations.

**Income Tax Expense (Benefit)** increased $199 million due primarily to pre-tax income in 2018 as compared to a pre-tax loss in 2017. This increase in income tax expense was diminished by the decrease in the federal statutory income tax rate from 35% in 2017 to 21% in 2018.

### LIQUIDITY AND CAPITAL RESOURCES

The following discussion of our liquidity and capital resources is on a consolidated basis, noting the uses and contributions, where material, of our two direct major operating subsidiaries.

### Operating Cash Flows

We expect our operating cash flows combined with cash on hand and financing activities to be sufficient to fund capital expenditures and shareholder dividend payments.

For the three months ended March 31, 2018, our operating cash flow decreased $57 million as compared to the same period in 2017. The net changes were primarily due to tax refunds in 2017 at Energy Holdings combined with net changes from our subsidiaries as discussed below.

### PSE&G

PSE&G’s operating cash flow increased $62 million from $515 million to $577 million for the three months ended March 31, 2018, as compared to the same period in 2017, due primarily to an increase of $58 million primarily due to a reduction in unbilled revenues resulting from lower prices and volumes in 2018, an increase of $54 million due to a change in regulatory deferrals, and higher earnings in 2018, partially offset by a tax refund in 2017.

### Power

Power’s operating cash flow decreased $38 million from $580 million to $542 million for the three months ended March 31, 2018, as compared to the same period in 2017, due primarily to an increase of $71 million in payments to counterparties and a $22 million decrease from fuels, materials and supplies, offset by a $69 million increase from net collections of counterparty receivables.

### Short-Term Liquidity

PSEG meets its short-term liquidity requirements, as well as those of Power, primarily with cash and through the issuance of commercial paper. PSE&G maintains its own separate commercial paper program to meet its short-term liquidity requirements. Each commercial paper program is fully back-stopped by its own separate credit facilities.

We continually monitor our liquidity and seek to add capacity as needed to meet our liquidity requirements. Each of our credit facilities is restricted as to availability and use to the specific companies as listed below; however, if necessary, the PSEG facilities can also be used to support our subsidiaries’ liquidity needs.

Our total credit facilities and available liquidity as of March 31, 2018 were as follows:

| Company/Facility Total Facility | As of March 31, 2018 Millions | Usage | Available Liquidity |
| --- | ---: | ---: | ---: |
| PSEG | $1,500 | $609 | $891 |
| PSE&G | 600 | 16 | 584 |
| Power | 2,100 | 158 | 1,942 |
| **Total** | **$4,200** | **$783** | **$3,417** |

As of March 31, 2018, our credit facility capacity was in excess of our projected maximum liquidity requirements over our 12 month planning horizon. Our maximum liquidity requirements are based on stress scenarios that incorporate changes in commodity prices and the potential impact of Power losing its investment grade credit rating from S&P or Moody’s, which would represent a three level downgrade from its current S&P or Moody’s ratings. In the event of a deterioration of Power’s credit rating certain of Power’s agreements allow the counterparty to demand further performance assurance. The potential additional collateral that we would be required to post under these agreements if Power were to lose its investment grade credit rating was approximately $867 million and $848 million as of March 31, 2018 and December 31, 2017, respectively.

For additional information, see Item 1. Note 11. Debt and Credit Facilities.

### Long-Term Debt Financing

During the next twelve months, PSE&G has $400 million of 5.30% Medium-Term Notes maturing in May 2018 and $350 million of 2.30% Medium-Term Notes maturing in September 2018. Power has $250 million of 2.45% Senior Notes maturing in November 2018.

For additional information see Item 1. Note 11. Debt and Credit Facilities.

### Common Stock Dividends

On February 20, 2018, our Board of Directors approved a $0.45 dividend per share of common stock for the first quarter of 2018. On April 17, 2018, our Board of Directors declared a $0.45 dividend per share of common stock for the second quarter of 2018. This reflects an indicative annual dividend rate of $1.80 per share. We expect to continue to pay cash dividends on our common stock; however, the declaration and payment of future dividends to holders of our common stock will be at the discretion of the Board of Directors and will depend upon many factors, including our financial condition, earnings, capital requirements of our businesses, alternate investment opportunities, legal requirements, regulatory constraints, industry practice and other factors that the Board of Directors deems relevant. For additional information related to cash dividends on our common stock, see Item 1. Note17. Earnings Per Share (EPS) and Dividends.

### Credit Ratings

If the rating agencies lower or withdraw our credit ratings, such revisions may adversely affect the market price of our securities and serve to materially increase our cost of capital and limit access to capital. Credit Ratings shown are for securities that we typically issue. Outlooks are shown for Corporate Credit Ratings (S&P) and Issuer Credit Ratings (Moody’s) and can be Stable, Negative, or Positive. There is no assurance that the ratings will continue for any given period of time or that they will not be revised by the rating agencies, if, in their respective judgments, circumstances warrant. Each rating given by an agency should be evaluated independently of the other agencies’ ratings. The ratings should not be construed as an indication to buy, hold or sell any security.

|  | Moody’s (A) | S&P (B) |
| --- | --- | --- |
| **PSEG** |  |  |
| Outlook | **Stable** | **Stable** |
| Senior Notes | Baa1 | BBB |
| Commercial Paper | P2 | A2 |
| **PSE&G** |  |  |
| Outlook | **Stable** | **Stable** |
| Mortgage Bonds | Aa3 | A |
| Commercial Paper | P1 | A2 |
| **Power** |  |  |
| Outlook | **Stable** | **Stable** |
| Senior Notes | Baa1 | BBB+ |

(A) Moody’s ratings range from Aaa (highest) to C (lowest) for long-term securities and P1 (highest) to NP (lowest) for short-term securities.

(B) S&P ratings range from AAA (highest) to D (lowest) for long-term securities and A1 (highest) to D (lowest) for short-term securities.

### CAPITAL REQUIREMENTS

We expect that all of our capital requirements over the next three years will come from a combination of internally generated funds and external debt financing. There were no material changes to our projected capital expenditures as compared to amounts disclosed in our 2017 Form 10-K.

### PSE&G

During the three months ended March 31, 2018, PSE&G made capital expenditures of $759 million, primarily for T&D system reliability. This does not include expenditures for cost of removal, net of salvage, of $38 million, which are included in operating cash flows.

### Power

During the three months ended March 31, 2018, Power made capital expenditures of $283 million, excluding $16 million for nuclear fuel, primarily related to our Keys, Sewaren 7, BH5 and other generation projects.

### ACCOUNTING MATTERS

For information related to recent accounting matters, see Item 1. Note 2. Recent Accounting Standards.

## Market risk

As filed, 3,162 characters.

The risk inherent in our market-risk sensitive instruments and positions is the potential loss arising from adverse changes in commodity prices, equity security prices and interest rates as discussed in the Notes to Condensed Consolidated Financial Statements. It is our policy to use derivatives to manage risk consistent with business plans and prudent practices. We have a Risk Management Committee comprised of executive officers who utilize a risk oversight function to ensure compliance with our corporate policies and risk management practices.

Additionally, we are exposed to counterparty credit losses in the event of non-performance or non-payment. We have a credit management process, which is used to assess, monitor and mitigate counterparty exposure. In the event of non-performance or non-payment by a major counterparty, there may be a material adverse impact on our financial condition, results of operations or net cash flows.

### Commodity Contracts

The availability and price of energy-related commodities are subject to fluctuations from factors such as weather, environmental policies, changes in supply and demand, state and federal regulatory policies, market rules and other events. To reduce price risk caused by market fluctuations, we enter into supply contracts and derivative contracts, including forwards, futures, swaps and options with approved counterparties. These contracts, in conjunction with physical sales and other services, help reduce risk and optimize the value of owned electric generation capacity.

### Value-at-Risk (VaR) Models

VaR represents the potential losses, under normal market conditions, for instruments or portfolios due to changes in market factors, for a specified time period and confidence level. We estimate VaR across our commodity businesses.

MTM VaR consists of MTM derivatives that are economic hedges. The MTM VaR calculation does not include market risks associated with activities that are subject to accrual accounting, primarily our generating facilities and some load serving activities.

The VaR models used are variance/covariance models adjusted for the change of positions with 95% and 99.5% confidence levels and a one-day holding period for the MTM activities. The models assume no new positions throughout the holding periods; however, we actively manage our portfolio.

From January through March 2018, MTM VaR varied between a low of $8 million and a high of $38 million at the 95% confidence level. The range of VaR was narrower for the three months ended March 31, 2018 as compared with the year ended December 31, 2017.

| 95% Confidence Level, Loss could exceed VaR one day in 20 days | MTM VaR Three Months Ended March 31, 2018 Millions | Year Ended December 31, 2017 |
| --- | ---: | ---: |
| Period End | $9 | $39 |
| Average for the Period | $21 | $10 |
| High | $38 | $39 |
| Low | $8 | $5 |
| **99.5% Confidence Level, Loss could exceed VaR one day in 200 days** |  |  |
| Period End | $14 | $60 |
| Average for the Period | $32 | $15 |
| High | $60 | $60 |
| Low | $13 | $8 |

See Item 1. Note 12. Financial Risk Management Activities for a discussion of credit risk.

## Controls and procedures

As filed, 1,618 characters.

### Disclosure Controls and Procedures

### PSEG, PSE&G and Power

We have established and maintain disclosure controls and procedures as defined under Rule 13a-15(e) and 15d-15(e) promulgated under the Securities Exchange Act of 1934, as amended (the “Exchange Act”) that are designed to provide reasonable assurance that information required to be disclosed in the reports that are filed or submitted under the Exchange Act is recorded, processed, summarized and reported and is accumulated and communicated to the Chief Executive Officer (CEO) and Chief Financial Officer (CFO) of each respective company, as appropriate, by others within the entities to allow timely decisions regarding required disclosure. We have established a disclosure committee which includes several key management employees and which reports directly to the CFO and CEO of each of PSEG, PSE&G and Power. The committee monitors and evaluates the effectiveness of these disclosure controls and procedures. The CFO and CEO of each of PSEG, PSE&G and Power have evaluated the effectiveness of the disclosure controls and procedures and, based on this evaluation, have concluded that disclosure controls and procedures at each respective company were effective at a reasonable assurance level as of the end of the period covered by the report.

### Internal Controls

### PSEG, PSE&G and Power

There have been no changes in internal control over financial reporting that occurred during the first quarter of 2018 that have materially affected, or are reasonably likely to materially affect, each registrant’s internal control over financial reporting.

## Risk factors

As filed, 658 characters.

The discussion of our business and operations in this Quarterly Report on Form 10-Q should be read together with the risk factors contained in Part I, Item 1A of our 2017 Annual Report on Form 10-K and our Quarterly Report on Form 10-Q for the quarter ended March 31, 2018, which describe various risks and uncertainties that could have a material adverse impact on our business, prospects, financial position, results of operations or cash flows and could cause results to differ materially from those expressed elsewhere in this report. There have been no material changes to the risk factors set forth in the above-referenced filings as of March 31, 2018.

Filed Apr 30, 2018.
Source: SEC EDGAR, the filing index for accession 0000788784-18-000007. Last ingested by Listed: Nov 6, 2026, 17:31 ET. No prices; not investment advice.