# Public Service Enterprise Group Inc: Form 10-Q for the period ended Mar 31, 2021

- Company: [Public Service Enterprise Group Inc](/companies/peg.md) (CIK 788784)
- Form: 10-Q
- Filed: 2021-05-05
- Accepted by EDGAR: May 5, 2021, 16:41 ET
- Period: 2021-03-31
- Accession: 0000788784-21-000012
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/788784/000078878421000012/pseg-20210331.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/788784/000078878421000012/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2021-03-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2021-01-01 to 2021-03-31 | $2.89bn | us-gaap:Revenues |
| Cost of revenue | 3 months, 2021-01-01 to 2021-03-31 | $1.03bn | us-gaap:CostOfGoodsAndServicesSold |
| Operating income | 3 months, 2021-01-01 to 2021-03-31 | $741.0m | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2021-01-01 to 2021-03-31 | $146.0m | us-gaap:InterestExpense |
| Income tax | 3 months, 2021-01-01 to 2021-03-31 | $117.0m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2021-01-01 to 2021-03-31 | $648.0m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2021-01-01 to 2021-03-31 | $1.28 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2021-01-01 to 2021-03-31 | $1.29 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2021-01-01 to 2021-03-31 | 507,000,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months, 2021-01-01 to 2021-03-31 | $1.03bn | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 3 months, 2021-01-01 to 2021-03-31 | $633.0m | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Dividends paid | 3 months, 2021-01-01 to 2021-03-31 | $258.0m | us-gaap:PaymentsOfDividendsCommonStock |
| Cash and equivalents | at 2021-03-31 | $803.0m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2021-03-31 | $3.60bn | us-gaap:AssetsCurrent |
| Total assets | at 2021-03-31 | $50.21bn | us-gaap:Assets |
| Current liabilities | at 2021-03-31 | $4.55bn | us-gaap:LiabilitiesCurrent |
| Long-term debt | at 2021-03-31 | $15.35bn | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2021-03-31 | $1.43bn | us-gaap:LongTermDebtCurrent |
| Short-term borrowings | at 2021-03-31 | $665.0m | us-gaap:CommercialPaper |
| Shareholders' equity | at 2021-03-31 | $16.28bn | us-gaap:StockholdersEquityIncludingPortionAttributableToNoncontrollingInterest |

## Management's discussion and analysis

As filed, 69,954 characters.

This combined MD&A is separately filed by Public Service Enterprise Group Incorporated (PSEG), Public Service Electric and Gas Company (PSE&G) and PSEG Power LLC (PSEG Power). Information contained herein relating to any individual company is filed by such company on its own behalf. PSE&G and PSEG Power each make representations only as to itself and make no representations whatsoever as to any other company.

PSEG’s business consists of two reportable segments, our principal direct wholly owned subsidiaries, which are:

- **PSE&G—**which is a public utility engaged principally in the transmission of electricity and distribution of electricity and natural gas in certain areas of New Jersey. PSE&G is subject to regulation by the New Jersey Board of Public Utilities (BPU) and the Federal Energy Regulatory Commission (FERC). PSE&G also invests in regulated solar generation projects and energy efficiency and related programs in New Jersey, which are regulated by the BPU, and
- **PSEG Power—**which is a multi-regional energy supply company that integrates the operations of its merchant nuclear and fossil generating assets with its power marketing businesses and fuel supply functions through competitive energy sales in well-developed energy markets primarily in the Northeast and Mid-Atlantic United States through its principal direct wholly owned subsidiaries. In addition, PSEG Power owns and operates solar generation in various states. PSEG Power’s subsidiaries are subject to regulation by FERC, the Nuclear Regulatory Commission (NRC), the Environmental Protection Agency (EPA) and the states in which they operate.

PSEG’s other direct wholly owned subsidiaries are: PSEG Long Island LLC (PSEG LI), which operates the Long Island Power Authority’s (LIPA) transmission and distribution (T&D) system under an Amended and Restated Operations Services Agreement (OSA); PSEG Energy Holdings L.L.C. (Energy Holdings), which earns it revenues from its portfolio of lease investments and holds our investment in offshore wind ventures; and PSEG Services Corporation (Services), which provides certain management, administrative and general services to PSEG and its subsidiaries at cost.

Our business discussion in Part I, Item 1. Business of our 2020 Annual Report on 10-K (Form 10-K) provides a review of the regions and markets where we operate and compete, as well as our strategy for conducting our businesses within these markets, focusing on operational excellence, financial strength and making disciplined investments. Our risk factor discussion in Part I, Item 1A. Risk Factors of Form 10-K provides information about factors that could have a material adverse impact on our businesses. The following supplements that discussion and the discussion included in the Executive Overview of 2020 and Future Outlook provided in Item 7 in our Form 10-K by describing significant events and business developments that have occurred during 2021 and changes to the key factors that we expect may drive our future performance. The following discussion refers to the Condensed Consolidated Financial Statements (Statements) and the Related Notes to Condensed Consolidated Financial Statements (Notes). This discussion should be read in conjunction with such Statements, Notes and the Form 10-K.

### EXECUTIVE OVERVIEW OF 2021 AND FUTURE OUTLOOK

We are continuing our transformation into a primarily regulated electric and gas utility that is focused on meeting customer expectations and is aligned with public policy objectives promoting infrastructure investments to modernize and improve reliability and clean energy investments. Our business plan focuses on achieving growth while controlling costs and managing the risks associated with regulatory changes, fluctuating commodity prices and changes in customer demand. In furtherance of these goals, over the past few years, our investments have altered our business mix to reflect a higher percentage of earnings contribution by PSE&G. In May 2021, we entered into a purchase agreement to sell PSEG Power’s solar portfolio and we are continuing to explore strategic alternatives for PSEG Power’s more than 6,750 megawatts (MW) of fossil generation located in New Jersey, Connecticut, New York and Maryland. See Item 1. Note 4. Early Plant Retirements/Asset Dispositions for additional information.

PSE&G, PSEG Power and PSEG LI are providing essential services during this national emergency related to the ongoing coronavirus (COVID-19) pandemic. We have implemented a comprehensive set of enhanced safety actions to help protect our employees, customers and communities, and we will continue to closely monitor developments and adjust as needed to ensure that we provide reliable service while protecting the safety and health of our workforce and the communities we serve. We continue to be guided by the recommendations of health authorities at the federal, state and local levels. Employees who can perform their job duties remotely are doing so. Those employees who must report to a work site are wearing personal protective equipment and practicing physical distancing measures.

The COVID-19 pandemic and associated government actions and economic effects continue to impact our businesses. We have incurred additional expenses to protect our employees and customers, and PSE&G is experiencing significantly higher bad debts and lower cash collections, as discussed below. The potential future impact of the pandemic and the associated economic impacts, which could extend beyond the duration of the pandemic, will depend on a number of factors outside of our control. These include the duration and severity of the outbreak as well as third-party actions taken to contain its spread and mitigate its public health effects, and governmental or regulatory actions regarding customer collections, potential limitations on rate increases, recovery of incremental costs, and other matters. While we currently cannot estimate the potential impact to our results of operations, financial condition and cash flows, this MD&A includes a discussion of potential effects of a prolonged outbreak.

### PSE&G

At PSE&G, our focus is on enhancing reliability and resiliency of our T&D system, meeting customer expectations and supporting public policy objectives by investing capital in T&D infrastructure and clean energy programs. For the five-year period ending December 31, 2025, PSE&G expects to invest between $13 billion to $15 billion, resulting in an expected compound annual growth in rate base of 6.5% to 8%. The low end of the range assumes an extension of our Gas System Modernization Program (GSMP) and Clean Energy Future (CEF)-Energy Efficiency (EE) program at their average annual investment levels, as these programs are expected to continue at least at those current rates beyond their currently approved timeframes of 2023 and 2024, respectively. The range is driven by certain unapproved investment programs, including a to-be- filed extension of the Energy Strong program, which otherwise concludes in 2023, as well as the remaining portion of our CEF proposal (portion of Electric Vehicle (EV) and Energy Storage (ES) programs) and a potentially higher amount of investment for GSMP and CEF-EE beyond current levels. See below for a description of the CEF program.

In January 2020, New Jersey released its Energy Master Plan (EMP) which, among other things, recognizes the importance of the State’s EE targets and supported EVs, ES, and advanced metering infrastructure (AMI).

In September 2020, PSE&G reached a settlement with parties in the CEF-EE proceeding, which the BPU approved. The settlement commits $1 billion over a three-year period, with the majority of the investment occurring over a five-year period. Costs will be recovered through annual rate-making, with returns aligned with our most recent base rate case and a ten-year amortization period.

The approval also included a Conservation Incentive Program, a mechanism that will provide for recovery of lost electric and gas variable margin revenues relative to a baseline of the test year in our last base rate case from July 2017 to June 2018. The deferral period for this mechanism is effective beginning in June 2021 for electric and October 2021 for gas. PSE&G will suspend its gas Weather Normalization Charge (WNC) when the gas deferral period begins.

In January 2021, the BPU approved a settlement with PSE&G and other parties in the CEF-Energy Cloud (EC) proceeding. The capital cost of the program, which includes implementation of AMI, is estimated to be approximately $700 million, invested over the next four years.

Also in January 2021, the BPU approved a settlement with PSE&G and other parties in the CEF-EV proceeding for a majority of the components of the program. The approved investment under the program is for $166 million, primarily relating to preparatory work to deliver infrastructure to the charging point for three programs: residential smart charging; Level-2 mixed use charging; and direct current fast charging.

All of the capital costs and expenses of the CEF-EC and CEF-EV programs will be recovered in PSE&G’s next base rate case, expected in the second half of 2024. From the start of the program until the commencement of new base rates, the return on and of the capital portion of each of these programs, as well as expenses incurred to implement the CEF-EV program and operating costs and stranded costs associated with the retirement of existing meters under the CEF-EC program, will be included for recovery in those rates. The remaining component of our CEF-EV proposal, the vehicle innovation subprogram, as well as the overall CEF-ES program, are being held in abeyance pending future policy guidance from the BPU.

We also continue to invest in transmission infrastructure in order to (i) maintain and enhance system integrity and grid reliability, grid security and safety, (ii) address an aging transmission infrastructure, (iii) leverage technology to improve the operation of the system, (iv) reduce transmission constraints, (v) meet growing demand and (vi) meet environmental requirements and standards set by various regulatory bodies. Our planned capital spending for transmission in 2021-2023 is $2.5 billion.

PSE&G has been deemed by New Jersey to provide essential services during the ongoing coronavirus pandemic. Our capital programs, including GSMP II, Energy Strong II and our transmission infrastructure investments, have not been materially impacted to date. However, a prolonged outbreak and the associated economic impacts, which could extend beyond the duration of the pandemic, could impact our ability to obtain necessary permits and approvals and could lead to shortages of necessary materials, supplies and labor. In addition, a determination by any state or federal regulatory authority that one or all of our projects is non-essential could require us to temporarily halt work. Any delay in our planned capital program could impact our operational performance and could materially impact our results of operations and financial condition through decreased cost recovery.

Further, the ongoing coronavirus pandemic could impact regulatory agencies’ ability to review proposed programs and delay the timing of approvals for matters subject to regulatory approval, including the approval of various clause recovery mechanisms.

PSE&G has experienced a reduction in demand from its commercial and industrial (C&I) customers, partially offset by increases in residential demand, and adverse changes to residential and C&I payment patterns. PSE&G expects these changes to continue during the prolonged coronavirus pandemic. In March 2021, the state formally extended its moratorium on non-safety related service disconnections for non-payment for residential customers through June 30, 2021. During the moratorium, PSE&G has experienced a significant decrease in cash inflow and higher Accounts Receivable aging and an associated increase in bad debt expense, which we expect could extend beyond the duration of the coronavirus pandemic. PSE&G’s electric distribution bad debt expense is recoverable through its Societal Benefits Clause (SBC) mechanism. PSE&G has deferred its incremental gas distribution bad debt expense as a result of COVID-19 as a Regulatory Asset and will seek recovery of that cost, as well as other net incremental COVID-19 costs, in its next base rate case.

In July 2020, the BPU authorized regulated utilities in New Jersey, including PSE&G, to create a COVID-19-related Regulatory Asset by deferring on their books and records the prudently incurred incremental costs related to COVID-19 beginning on March 9, 2020 through September 30, 2021, or 60 days after the New Jersey governor determines that the Public Health Emergency is no longer in effect, or in the absence of such a determination, 60 days from the time the Public Health Emergency automatically terminates by law, whichever is later. Deferred costs are to be offset by any federal or state assistance that the utility may receive as a direct result of the COVID-19 pandemic. As of March 31, 2021, PSE&G has recorded a Regulatory Asset related to COVID-19 to defer incremental costs of $60 million, which PSE&G expects are probable of recovery under the BPU order.

While the impact on our results of operations, financial condition and cash flows for the three months ended March 31, 2021 has not been material, a prolonged coronavirus pandemic and the associated economic impacts, which could extend beyond the duration of the pandemic, could materially impact cash from operations, Accounts Receivable and bad debt expense.

### PSEG Power

In July 2020, we announced that we are exploring strategic alternatives for PSEG Power’s non-nuclear generating fleet with the intention of accelerating the transformation of our business into a primarily regulated electric and gas utility, with a significantly contracted generation business. It is expected to reduce overall business risk and earnings volatility, improve PSEG’s credit profile and is consistent with PSEG’s climate strategy and sustainability efforts, which is to focus on clean energy investments, methane reduction, and zero-carbon generation. PSEG intends to retain ownership of PSEG Power’s existing nuclear fleet. Since the announcement, we have engaged in proprietary activities relating to the potential divestiture of these assets and any potential transactions are expected to be completed sometime in 2021.

In May 2021, PSEG Power Ventures LLC (Power Ventures), a direct wholly owned subsidiary of PSEG Power, entered into a purchase agreement with Quattro Solar, LLC, an affiliate of LS Power, relating to the sale by Power Ventures of 100% of its ownership interest in PSEG Solar Source LLC including its related assets and liabilities. The transaction is expected to close during the second or third quarter of 2021, subject to certain closing conditions, adjustments and regulatory approvals.

There is no assurance that the strategic review will result in a sale or other disposition of all or any portion of the fossil generation assets on terms that are favorable to us, or at all. Any transaction would be subject to market conditions and customary closing conditions, including the receipt of all required regulatory approvals.

At PSEG Power, we have sought to achieve operational excellence and manage costs in order to optimize cash flow generation from our fleet in light of low wholesale power and gas prices, environmental considerations and competitive market forces that reward efficiency and reliability. In the first three months of 2021, our natural gas and nuclear units generated 4.7 and 8.2 terawatt hours and operated at a capacity factor of 41.7% and 98.8%, respectively. Our commitments for load, such as basic generation service (BGS) in New Jersey and other bilateral supply contracts, are backed by this generation or may be combined with the use of physical commodity purchases and financial instruments from the market to optimize the economic efficiency of serving our obligations. PSEG Power’s hedging practices help to manage some of the volatility of the merchant power business. More than 75% of PSEG Power’s expected gross margin in 2021 relates to hedging of our energy margin, our expected revenues from the capacity market mechanisms, Zero Emission Certificate (ZEC) revenues and certain ancillary service payments such as reactive power.

As discussed further below under “Wholesale Power Market Design,” FERC issued an order establishing new rules for PJM’s capacity market, extending the PJM Minimum Offer Price Rule (MOPR) to include both new and existing resources that receive or are entitled to receive certain out-of-market payments, with certain exemptions. PSEG Power’s New Jersey nuclear plants that receive ZEC payments will be subject to the new MOPR. In addition, as a result of FERC’s finding that default procurement auctions such as BGS could be considered subsidies, it is possible that other PSEG units could be subject to the MOPR. The MOPR’s floor prices are not expected to prevent either our nuclear or gas-fired units from clearing in the next

Reliability Pricing Model (RPM) auction. We cannot predict whether additional changes will be made to the MOPR, or whether changes will occur in the PJM market that would impact our ability to clear any of these units in future RPM auctions.

### PSEG LI

Following the effects of Tropical Storm Isaias, the New York Attorney General initiated an inquiry into PSEG LI’s preparation and response to the storm. In addition, the Department of Public Service (DPS) within the New York State Public Service Commission launched an investigation of state electric service providers, including PSEG LI, and other state telephone, cable and internet providers into their preparation and restoration efforts following Tropical Storm Isaias. Although the inquiry by the New York Attorney General remains pending, the DPS issued an interim storm investigation report. With respect to PSEG LI, the DPS’ report found that PSEG LI violated its Emergency Response Plan and DPS Regulations, and recommended that LIPA consider taking various actions, including terminating or renegotiating the OSA. LIPA also initiated its own review of PSEG LI’s performance and issued a report with recommendations for improvements to PSEG LI’s structure and processes, including a timeline for implementing those recommendations. That report also recommended that LIPA either renegotiate or terminate the OSA.

In December 2020, LIPA filed a complaint against PSEG LI in New York State court alleging multiple breaches of the OSA in connection with PSEG LI’s preparation for and response to Tropical Storm Isaias seeking specific performance and $70 million in damages. Pursuant to recommendations by the New York State DPS, LIPA has initiated a series of actions to allow its board to determine whether to seek to terminate the OSA or instead continue with PSEG LI as its Service Provider. LIPA and PSEG LI are engaged in settlement discussions concerning various amendments to the OSA during which the litigation has been tolled. If the parties reach a settlement agreement, any amendments to the OSA will require the approval of the New York Attorney General and the New York Comptroller.

PSEG LI is fully cooperating with the inquiries by the New York Attorney General and the DPS, and we cannot predict their outcome. PSEG LI also continues to work closely with LIPA to address the recommendations in LIPA’s report. In the absence of a settlement agreement and the required approvals, PSEG LI intends to vigorously defend itself with regard to the allegations in LIPA’s complaint alleging breaches of the OSA; however, a decision in this proceeding requiring specific performance or the payment of damages by PSEG LI or resulting in the termination of the OSA could have a material adverse effect on PSEG’s results of operations and financial condition.

### Climate Strategy and Sustainability Efforts

For more than a century, our mission has been to provide safe access to an around-the-clock supply of reliable, affordable energy. Building on this mission, we believe in a future where customers universally use less energy, the energy they use is cleaner, and its delivery is more reliable and more resilient. In July 2019, we announced that we expect to cut carbon emissions at PSEG Power’s generation fleet by 80% by 2046, from 2005 levels. We have also announced our vision of attaining net zero- carbon emissions by 2050, assuming advances in technology, public policy and customer behavior.

PSE&G has also undertaken a number of initiatives that support the reduction of greenhouse gas (GHG) emissions and the implementation of energy efficiency initiatives. The first phase of our GSMP replaced approximately 450 miles of cast-iron and unprotected steel gas infrastructure, and the second phase of this program is expected to replace an additional 875 miles of gas pipes through 2023. The GSMP is designed to significantly reduce gas leaks in our distribution system, which would reduce the release of methane, a potent GHG, into the air. Through GSMP II, from 2018 through 2023 we expect an approximate 22% reduction in methane, and assuming a continuation of GSMP, we expect an approximate 60% reduction in methane emissions from 2011 through 2030. In addition, PSE&G’s CEF-EE which was approved by the BPU in September 2020, the CEF-EC and CEF-EV programs, which were approved by the BPU in January 2021, and the proposed CEF-ES program are intended to support New Jersey’s EMP through programs designed to help customers increase their energy efficiency, support the expansion of the electric vehicle infrastructure in the State, install energy storage capacity to supplement solar generation and enhance grid resiliency, install smart meters and supporting infrastructure to allow for the integration of other clean energy technologies and to more efficiently respond to weather and other outage events. We also continue to assess physical risks of climate change and adapt our capital investment program to improve the reliability and resiliency of our system in an environment of increasing frequency and severity of weather events, notably through our investments in Energy Strong.

### Offshore Wind

In December 2020, PSEG entered into a definitive agreement with Ørsted North America to acquire a 25% equity interest in Ørsted’s Ocean Wind project. Ocean Wind was selected by New Jersey to be the first offshore wind farm as part of the state’s intention to add 7,500 MW of offshore wind generating capacity by 2035. The Ocean Wind project could provide first power in late 2024. On March 31, 2021, the BPU approved PSEG’s investment in Ocean Wind and the acquisition was completed in April 2021. Additionally, PSEG and Ørsted each owns 50% of Garden State Offshore Energy LLC which holds rights to an offshore wind lease area. PSEG and Ørsted are exploring other offshore wind opportunities.

### Operational Excellence

We emphasize operational performance while developing opportunities in both our regulated and competitive businesses. In the first three months of 2021, our utility continued its efforts to control costs while maintaining strong operational performance and has implemented protocols to ensure that we are providing essential services to our customers during the ongoing coronavirus pandemic in a safe and reliable manner.

### Financial Strength

Our financial strength is predicated on a solid balance sheet, positive operating cash flow and reasonable risk-adjusted returns on increased investment. Our financial position remained strong during the first three months of 2021 as we

- maintained sufficient liquidity,
- maintained solid investment grade credit ratings, and
- increased our indicative annual dividend for 2021 to $2.04 per share.

We expect to be able to fund our planned capital requirements, as described in Liquidity and Capital Resources without the issuance of new equity. Our planned capital requirements, which are driven by growth in our regulated utility, and the potential sale of our non-nuclear generation fleet are expected to improve our business and financial profile.

### Financial Results

The results for PSEG, PSE&G and PSEG Power for the three months ended March 31, 2021 and 2020 are presented as follows:

| Earnings (Losses) | Three Months Ended March 31, 2021 Millions | 2020 |
| --- | ---: | ---: |
| PSE&G | $477 | $440 |
| PSEG Power | 161 | 13 |
| Other (A) | 10 | (5) |
| **PSEG Net Income** | **$648** | **$448** |
| **PSEG Net Income Per Share (Diluted)** | **$1.28** | **$0.88** |

(A) Other includes after-tax activities at the parent company, PSEG LI, and Energy Holdings as well as intercompany eliminations.

PSEG Power’s results above include the Nuclear Decommissioning Trust (NDT) Fund activity and the impacts of non-trading commodity mark-to-market (MTM) activity, which consist of the financial impact from positions with future delivery dates.

The variances in our Net Income attributable to changes related to the NDT Fund and MTM are shown in the following table:

|  | Three Months Ended March 31, 2021 Millions, after tax | 2020 |
| --- | ---: | ---: |
| NDT Fund Income (Expense) (A) (B) | $32 | $(135) |
| Non-Trading MTM Gains (Losses) (C) | $(34) | $77 |

(A) NDT Fund Income (Expense) includes gains and losses on NDT securities which are recorded in Net Gains (Losses) on Trust Investments. See Item 1. Note 9. Trust Investments for additional information. NDT Fund Income (Expense) also includes interest and dividend income and other costs related to the NDT Fund recorded in Other Income (Deductions), interest accretion expense on PSEG Power’s nuclear Asset Retirement Obligation (ARO) recorded in Operation and Maintenance Expense and the depreciation related to the ARO asset recorded in Depreciation and Amortization (D&A) Expense.

(B) Net of tax (expense) benefit of $(23) million and $84 million for the three months ended March 31, 2021 and 2020, respectively.

(C) Net of tax (expense) benefit of $13 million and $(30) million for the three months ended March 31, 2021 and 2020, respectively.

Our $200 million increase in Net Income for the three months ended March 31, 2021 was driven primarily by

- net gains on NDT Fund equity securities as compared to significant net losses in 2020 at PSEG Power,
- higher earnings due to continued investments in T&D programs at PSE&G,
- higher average realized prices in the PJM, New England (NE) and New York (NY) regions coupled with higher volumes of electricity sold in the NE region at PSEG Power, and
- higher pension and OPEB credits,
- partially offset by MTM losses in 2021 as compared to MTM gains in 2020 at PSEG Power.

The greater emphasis on capital spending in recent years for projects at PSE&G relative to PSEG Power, particularly those on which we receive contemporaneous returns at PSE&G has yielded strong results, which when combined with the cash flow generated by PSEG Power, has allowed us to meet customer needs and address market conditions and investor expectations. We continue our focus on operational excellence, financial strength and disciplined investment. These guiding principles have provided the base from which we have been able to execute our strategic initiatives.

### Disciplined Investment

We utilize rigorous criteria and consider a number of external factors, focusing on the value for our stakeholders, as well as other impacts, when determining how and when to efficiently deploy capital. We principally explore opportunities for investment in areas that complement our existing business and provide reasonable risk-adjusted returns and continuously assess and optimize our business mix as appropriate. In the first three months of 2021, we

- made additional investments in T&D infrastructure projects on time and on budget,
- continued to execute our Energy Efficiency and other existing BPU-approved utility programs,
- continued to evaluate potential additional offshore wind opportunities, and
- continued the process to potentially sell PSEG Power’s non-nuclear generation business, which is expected to improve our business profile and accelerate our transition to a primarily regulated electric and gas utility, with a significantly contracted energy business.

### Regulatory, Legislative and Other Developments

In our pursuit of operational excellence, financial strength and disciplined investment, we closely monitor and engage with stakeholders on significant regulatory and legislative developments. Transmission planning rules and wholesale power market design are of particular importance to our results and we continue to advocate for policies and rules that promote fair and efficient electricity markets. For additional information about regulatory, legislative and other developments that may affect us, see Part I, Item 1. Business—Regulatory Issues in our Form 10-K and Item 5. Other Information in this Quarterly Report on Form 10-Q.

### Transmission Rate Proceedings and Return on Equity (ROE)

In March 2019, FERC issued a Notice of Inquiry seeking comments on improvements to FERC’s electric transmission incentives policy. Subsequently, in April 2021, FERC issued a supplemental notice of proposed rulemaking to eliminate the incentive for Regional Transmission Organization (RTO) membership for transmitting utilities that have already received the incentive for three or more years. PSE&G began receiving a 50 basis point adder for RTO membership in 2008. Elimination of the adder for RTO membership could reduce PSE&G’s annual Net Income and annual cash inflows by approximately $30 million.

In May 2020, FERC issued an order revising an earlier order that established a new ROE policy for reviewing existing transmission ROEs. The revised methodology uses the Discounted Cash Flow model, the Capital Asset Pricing model and the Risk Premium model to determine if an existing base ROE is unjust and unreasonable and, if so, what replacement ROE is appropriate. FERC’s order indicated that it would not be bound by this revised methodology when considering the just and reasonableness of a utility’s ROE in future proceedings. We continue to analyze the potential impact of these methodologies.

ROE complaints have been pending before FERC regarding MISO transmission owners, the ISO New England Inc. transmission owners and utilities in other jurisdictions. In addition, over the past few years, several companies have negotiated settlements that have resulted in reduced ROEs.

We are engaged in settlement discussions with the BPU Staff and the New Jersey Division of Rate Counsel about the level of PSE&G’s base transmission ROE and other formula rate matters. An adverse change to PSE&G’s base transmission ROE or ROE incentives could be material. We estimate that for each 25 basis point reduction in PSE&G’s base transmission ROE, and all other factors unchanged, PSE&G’s annual Net Income and annual cash inflows would decrease by approximately $15 million. While we cannot predict the outcome of the settlement discussions, it may result in a change to our base transmission ROE that is multiples of this sensitivity measure.

### Wholesale Power Market Design

In December 2019, FERC issued an order establishing new rules for PJM’s capacity market, extending the PJM MOPR to include both new and existing resources that receive or are entitled to receive certain out-of-market payments, with certain exemptions.

PSEG Power’s New Jersey nuclear plants that receive ZEC payments will be subject to the new MOPR. Resources that are subject to the MOPR continue to have the ability to justify a bid below the MOPR floor price under the unit-specific exemption. The MOPR floor prices are not expected to prevent either our nuclear units or gas-fired units from clearing in the next RPM auction. In May 2020, FERC issued an order modifying PJM’s methodology for pricing energy reserves. It also directed PJM to use forward-looking energy and ancillary service revenues, which can affect how the MOPR offer floors are calculated. In addition, if one or more electric distribution zones in New Jersey (or another state) were to become fixed resource requirement (FRR) alternative service areas, procurements needed for that area could provide an alternate means for nuclear units whose ability to clear in RPM auctions was affected by the MOPR to provide capacity within PJM. We cannot predict whether additional changes will be made to the MOPR, or whether changes will occur in the PJM market that would impact our ability to clear any of these units in future RPM auctions.

States that have clean energy programs designed to achieve public policy goals that support such resources as solar, offshore wind and nuclear, are not prevented from pursuing those programs by the expanded MOPR and could choose to utilize the existing FRR approach authorized under the PJM tariff. Subsidized units that cannot clear in a RPM capacity auction because of the expanded MOPR could still count as capacity resources to a load serving entity using the FRR approach. In a March 2020 order, the BPU initiated an investigation to examine whether New Jersey can achieve its long-term clean energy and environmental objectives under the current resource adequacy procurement paradigm and potential alternatives. One of the areas of inquiry concerns the potential creation of FRR service areas within New Jersey. We cannot predict the impact these rules or any measures taken by the BPU will have on the capacity market or our generating stations.

In January 2020, New Jersey rejoined the Regional Greenhouse Gas Initiative (RGGI). As a result, generating plants operating in New Jersey, including those owned by PSEG Power, that emit CO2 emissions will be required to procure credits for each ton they emit. In response to RGGI, PJM initiated a process in 2019 to investigate the development of a carbon pricing mechanism that may mitigate the environmental and financial distortions that could occur when emissions “leak” from non-participating states to the RGGI states. If the process leads to a market solution, it could have a material impact on the value of PSEG Power’s generating fleet.

### Environmental Regulation

We are subject to liability under environmental laws for the costs and penalties of remediating environmental contamination of property now or formerly owned by us and of property contaminated by hazardous substances that we generated. In particular, the historic operations of PSEG companies and the operations of numerous other companies along the Passaic and Hackensack Rivers are alleged by Federal and State agencies to have discharged substantial contamination into the Passaic River/Newark Bay Complex in violation of various statutes. We are also currently involved in a number of proceedings relating to sites where other hazardous substances may have been discharged and may be subject to additional proceedings in the future, and the costs and penalties of any such remediation efforts could be material.

For further information regarding the matters described above, as well as other matters that may impact our financial condition and results of operations, see Item 1. Note 11. Commitments and Contingent Liabilities.

### Nuclear

In April 2019, PSEG Power’s Salem 1, Salem 2 and Hope Creek nuclear plants were awarded ZECs by the BPU. Pursuant to a process established by the BPU, ZECs are purchased from selected nuclear plants and recovered through a non-bypassable distribution charge in the amount of $0.004 per kilowatt-hour used (which is equivalent to approximately $10 per megawatt hour (MWh) generated in payments to selected nuclear plants (ZEC payment)). Each nuclear plant is expected to receive ZEC revenue for approximately three years, through May 2022.

In April 2021, PSEG Power’s Salem 1, Salem 2 and Hope Creek nuclear plants were awarded ZECs for the three-year eligibility period starting June 2022 at the same approximate $10 per MWh received during the current ZEC period through May 2022 referenced above. As a result, each nuclear plant is expected to receive ZEC revenue for approximately three years starting June 2022. The terms and conditions of this April 2021 ZEC award are generally similar to the current ZEC period as discussed above.

The award of ZECs attaches certain obligations, including an obligation to repay the ZECs in the event that a plant ceases operations during the approximate three-year period that it was awarded ZECs, subject to certain exceptions specified in the ZEC legislation. PSEG Power has and will continue to recognize revenue monthly as the nuclear plants generate electricity and satisfy their performance obligations. Further, the ZEC payment may be adjusted by the BPU at any time to offset environmental or fuel diversity payments that a selected nuclear plant may receive from another source. For instance, the New Jersey Division of Rate Counsel (New Jersey Rate Counsel), in written comments filed with the BPU, has advocated for the BPU to offset market benefits resulting from New Jersey’s rejoining the Regional Greenhouse Gas Initiative from the ZEC payment. PSEG intends to vigorously defend against these arguments. Due to its preliminary nature, PSEG cannot predict the outcome of this matter.

The BPU’s April 2019 decision awarding ZECs through May 2022 has been appealed by the New Jersey Rate Counsel. In March 2021, the New Jersey Appellate Division affirmed the BPU’s April 2019 decision granting ZECs for the first eligibility period. In April 2021, New Jersey Rate Counsel has petitioned to the New Jersey Supreme Court for further appellate review. PSEG cannot predict the outcome of this matter.

In the event that (i) the ZEC program is overturned or is otherwise materially adversely modified through legal process; or (ii) any of the Salem 1, Salem 2 and Hope Creek plants is not sufficiently valued for its environmental, fuel diversity or resilience attributes in future periods and does not otherwise experience a material financial change that would remove the need for such attributes to be sufficiently valued, PSEG Power will take all necessary steps to cease to operate all of these plants. Alternatively, even with sufficient valuation of these attributes, if the financial condition of the plants is materially adversely impacted by changes in commodity prices, FERC’s changes to the capacity market construct (absent sufficient capacity revenues provided under a program approved by the BPU in accordance with a FERC-authorized capacity mechanism), or, in the case of the Salem nuclear plants, decisions by the EPA and state environmental regulators regarding the implementation of Section 316(b) of the Clean Water Act and related state regulations, or other factors, PSEG Power will take all necessary steps to cease to operate all of these plants. Ceasing operations of these plants would result in a material adverse impact on PSEG’s and PSEG Power’s results of operations.

### Tax Legislation

On March 31, 2021, the White House released an overview of The American Jobs Plan and Made in America Tax Plan. Although very few details of the plans have been released, the Made in America Tax Plan includes an increase in the federal corporate tax rate and a minimum tax levied on book earnings. If either provision is enacted, it would have an unfavorable impact on PSEG’s and PSEG Power’s financial statements and would increase PSE&G’s customers’ bills.

A prolonged coronavirus pandemic or further economic stimulus could result in future federal or state legislation which could have a material impact on our effective tax rate and cash tax position.

The Consolidated Appropriations Act, 2021 (CAA) was enacted in late December 2020. The CAA provides a 30% investment tax credit for offshore wind projects that begin construction before December 31, 2025. Also, on December 31, 2020, Notice 2021-05 was issued. For qualifying offshore wind projects, the notice extends the four year continuity safe harbor to ten calendar years commencing the calendar year after which construction of the project begins.

In July 2020, the Internal Revenue Service (IRS) issued final and proposed regulations addressing the limitation on deductible business interest expense contained in the Tax Cuts and Jobs Act (Tax Act). These regulations retroactively allow depreciation to be added back in computing the 30% adjusted taxable income (ATI) cap, increasing the amount of interest that can be deducted by unregulated businesses in years before 2022. For 2022 and after, the regulations continue to disallow the addback of depreciation in the computation of ATI, effectively lowering the cap on the amount of deductible business interest. The portion of PSEG’s and PSEG Power’s business interest expense that was disallowed in 2018 and 2019 will now be deductible in those respective years.

In March 2020, the federal Coronavirus Aid, Relief, and Economic Security Act (CARES Act) was enacted. The CARES Act allows a five-year carryback of any net operating loss (NOL) generated in a taxable year beginning after December 31, 2017 and before January 1, 2021.

### Future Outlook

Our future success will depend on our ability to continue to maintain strong operational and financial performance to capitalize on or otherwise address regulatory and legislative developments that impact our business and to respond to the issues and challenges described below. In order to do this, we will continue to:

- obtain approval of and execute on our utility capital investment program to enhance the resiliency of our infrastructure, maintain the reliability of the service we provide to our customers, and align our sustainability and climate goals with

New Jersey’s energy policy,

- focus on controlling costs while maintaining safety, reliability and customer satisfaction and complying with applicable standards and requirements,
- deliver on our Human Capital Management strategy to attract, develop and retain a diverse, high-performing workforce,
- successfully manage our energy obligations and re-contract our open supply positions in response to changes in prices and demand, mindful of the cost and affordability impacts to our electric and gas distribution customers,
- advocate for federal and state programs to properly value New Jersey’s largest zero-carbon generation resource and measures that promote fair and efficient electricity markets, including recognition of the cost of emissions,
- engage constructively with our multiple stakeholders, including regulators, government officials, customers, employees, investors, suppliers and the communities in which we do business,
- finalize our strategic alternatives review for PSEG Power’s non-nuclear generating assets and successfully execute any transactions involving those assets as we transform our business mix into a mostly regulated utility and contracted generating company with a carbon-free nuclear and offshore wind fleet,
- successfully operate the LIPA T&D system and manage LIPA’s fuel supply and generation dispatch obligations, and
- manage the risks and opportunities in environmental, social and governance (ESG) matters, which is an integral part of our long-term strategy to be a clean energy leader for the benefit of all stakeholders.

In addition to the risks described elsewhere in this Form 10-Q and in our Form 10-K, for 2021 and beyond, the key issues and challenges we expect our business to confront include:

- regulatory and political uncertainty, both with regard to future energy policy, design of energy and capacity markets, transmission policy and environmental regulation, as well as with respect to the outcome of any legal, regulatory or other proceedings,
- the continuing impact of the ongoing coronavirus pandemic and the associated economic impact, which could extend beyond the duration of the pandemic,
- future changes in federal and state tax laws, including The American Jobs Plan and Made in America Tax Plan, and
- the impact of changes in demand, natural gas and electricity prices, and expanded efforts to decarbonize several sectors of the economy.

We continually assess a broad range of strategic options to maximize long-term stockholder value and address the interests of our multiple stakeholders. In assessing our options, we consider a wide variety of factors, including the performance and prospects of our businesses; the views of employees, investors, regulators, customers and rating agencies; our existing indebtedness and restrictions it imposes; and tax considerations, among other things. Strategic options available to us include:

- investments in T&D facilities to enhance reliability, resiliency and modernize the system to meet the growing needs and increasingly higher expectations of customers, and clean energy investments such as CEF-EE, CEF-EV and CEF-ES,
- the disposition or restructuring of our merchant generation business or portions thereof or other existing businesses or the acquisition or development of new businesses,
- investments in offshore wind with long-term contracts that provide predictability and a reasonable risk-adjusted return,
- continued operations of our nuclear generation facilities, to the extent there is sufficient certainty that their operation will render an acceptable risk-adjusted return, and
- acquisitions, dispositions and other transactions involving assets or businesses that could provide value to customers and shareholders.

There can be no assurance, however, that we will successfully develop and execute any of the strategic options noted above, or any additional options we may consider in the future. The execution of any such strategic plan may not have the expected benefits or may have unexpected adverse consequences.

### RESULTS OF OPERATIONS

### PSEG

Our results of operations are primarily comprised of the results of operations of our principal operating subsidiaries, PSE&G and PSEG Power, excluding charges related to intercompany transactions, which are eliminated in consolidation. For additional information on intercompany transactions, see Item 1. Note 20. Related-Party Transactions.

|  | Three Months Ended March 31, 2021 Millions | 2020 | Increase/ (Decrease) 2021 vs. 2020 Millions% |  |
| --- | ---: | ---: | ---: | ---: |
| Operating Revenues | $2,889 | $2,781 | $108 | 4 |
| Energy Costs | 1,029 | 906 | 123 | 14 |
| Operation and Maintenance | 778 | 754 | 24 | 3 |
| Depreciation and Amortization | 341 | 324 | 17 | 5 |
| Income from Equity Method Investments | 3 | 3 | — | — |
| Net Gains (Losses) on Trust Investments | 60 | (221) | 281 | N/A |
| Other Income (Deductions) | 25 | 4 | 21 | N/A |
| Net Non-Operating Pension and OPEB Credits (Costs) | 82 | 62 | 20 | 32 |
| Interest Expense | 146 | 153 | (7) | (5) |
| Income Tax (Benefit) Expense | 117 | 44 | 73 | N/A |

The following discussions for PSE&G and PSEG Power provide a detailed explanation of their respective variances.

### PSE&G

|  | Three Months Ended March 31, 2021 Millions | 2020 | Increase/ (Decrease) 2021 vs. 2020 Millions% |  |
| --- | ---: | ---: | ---: | ---: |
| Operating Revenues | $2,073 | $1,883 | $190 | 10 |
| Energy Costs | 849 | 708 | 141 | 20 |
| Operation and Maintenance | 424 | 386 | 38 | 10 |
| Depreciation and Amortization | 241 | 222 | 19 | 9 |
| Net Gains (Losses) on Trust Investments | 1 | — | 1 | N/A |
| Other Income (Deductions) | 28 | 27 | 1 | 4 |
| Net Non-Operating Pension and OPEB Credits (Costs) | 66 | 51 | 15 | 29 |
| Interest Expense | 98 | 96 | 2 | 2 |
| Income Tax Expense (Benefit) | 79 | 109 | (30) | (28) |

### Three Months Ended March 31, 2021 as Compared to 2020

**Operating Revenues** increased $190 million due to changes in delivery, commodity, clause and other operating revenues.

***Delivery Revenues*** increased $23 million due primarily to

- Transmission revenues were $26 million higher due to an increase in revenue requirements attributable to higher rate base investment.
- Electric distribution revenues increased $12 million due primarily to a $10 million increase attributable to higher sales volumes and a $2 million increase in Green Program Recovery Charge (GPRC) collections.
- Gas distribution revenues increased $9 million due primarily to a $57 million increase due to higher sales volumes and a $3 million increase in GPRC revenues. These increases were partially offset by $51 million in accrued WNC revenues in the first quarter of 2020.
- Electric and Gas revenues decreased by $24 million due to a net increase in the flowback to customers of excess deferred tax liabilities and tax repair-related accumulated deferred income tax benefits resulting from rate reductions, which is offset in Income Tax Expense.

***Commodity Revenues*** increased $144 million as a result of higher Gas revenues and higher Electric revenues. The changes in Commodity revenues for both gas and electric are entirely offset by the changes in Energy Costs. PSE&G earns no margin on the provision of basic gas supply service (BGSS) and BGS to retail customers.

- Gas commodity revenues increased $102 million due primarily to higher BGSS sales volumes of $57 million and higher BGSS prices of $45 million.
- Electric commodity revenues increased $42 million due primarily to a $67 million increase in sales volumes, partially offset by $25 million in lower BGS prices.

***Clause Revenues*** increased $23 million due primarily to higher SBC revenues of $22 million and a $1 million net increase in Tax Adjustment Credit (TAC) and GPRC deferrals. The changes in SBC revenues and TAC and GPRC deferral amounts are entirely offset by changes in the amortization of Regulatory Assets and Regulatory Liabilities and related costs in O&M, D&A, Interest and Income Tax Expenses. PSE&G does not earn margin on SBC revenues or TAC and GPRC deferrals.

***Other Operating Revenues*** were flat. An $11 million decrease in Solar Renewable Energy Certificate (SREC) revenues was entirely offset by an $8 million increase in Transition Renewable Energy Certificate (TREC) revenues and a $3 million increase in appliance service revenues. The changes in SREC and TREC components of revenues are entirely offset by changes to Energy Costs.

### Operating Expenses

**Energy Costs** increased $141 million. This is entirely offset by changes in Commodity Revenues and Other Operating Revenues.

**Operation and Maintenance** increased $38 million due primarily to a $21 million increase in clause and renewable-related expenses, a $7 million increase in appliance service costs, a $4 million increase in transmission expenditures, a $3 million increase in grounds maintenance for snow removal, a $2 million increase in distribution corrective and preventative maintenance and $1 million increase in vegetation management expenditures.

**Depreciation and Amortization** increased $19 million due primarily to a $13 million increase related to additional plant in service and a $5 million increase in the amortization of Regulatory Assets.

**Net Non-Operating Pension and OPEB Credits (Costs)** increased $15 million due primarily to a $12 million decrease in interest cost and a $7 million increase in the expected return on plan assets, partially offset by a $2 million increase in the amortization of the net actuarial loss and a $2 million increase in the amortization of net prior service cost.

**Interest Expense** increased $2 million due primarily to a $1 million increase from net debt issuances in 2021 and a $3 million increase from net debt issuances in 2020. These increases were partially offset by a decrease of $2 million due to a reduction in short-term borrowings and a decrease in the allowance for funds used during construction.

**Income Tax Expense** decreased $30 million due primarily to an increase in the 2021 flowback of PSE&G’s excess deferred income tax liabilities and CEF program investments, partially offset by an increase in bad debt flow-through.

### PSEG Power

|  | Three Months Ended March 31, 2021 Millions | 2020 | Increase/ (Decrease) 2021 vs. 2020 Millions% |  |
| --- | ---: | ---: | ---: | ---: |
| Operating Revenues | $1,167 | $1,220 | $(53) | (4) |
| Energy Costs | 682 | 676 | 6 | 1 |
| Operation and Maintenance | 222 | 241 | (19) | (8) |
| Depreciation and Amortization | 92 | 94 | (2) | (2) |
| Income from Equity Method Investments | 3 | 3 | — | — |
| Net Gains (Losses) on Trust Investments | 58 | (220) | 278 | N/A |
| Other Income (Deductions) | (4) | (23) | 19 | (83) |
| Net Non-Operating Pension and OPEB Credits (Costs) | 12 | 8 | 4 | 50 |
| Interest Expense | 27 | 34 | (7) | (21) |
| Income Tax Expense (Benefit) | 52 | (70) | 122 | N/A |

### Three Months Ended March 31, 2021 as Compared to 2020

**Operating Revenues** decreased $53 million due primarily to changes in generation and gas supply revenues.

***Generation Revenues*** decreased $128 million due primarily to

- a net decrease of $202 million due to MTM losses in 2021 as compared to MTM gains in 2020. Of this amount, there was a $167 million decrease due to changes in forward prices in 2021 as compared to 2020 coupled with a $35 million decrease due to losses on positions reclassified to realized upon settlement in 2021 compared to gains in 2020, and
- a net decrease of $22 million in electricity sold primarily due to the transfer of responsibility for firm transmission services under the BGS contracts from the BGS suppliers to the Electric Distribution Companies (EDCs),
- partially offset by a net increase of $81 million due primarily to higher average realized prices in the PJM, NE and NY regions coupled with higher volumes of electricity sold in the NE region. This was partially offset by lower volumes of electricity sold in the PJM region, and
- a net increase of $10 million in capacity revenues due primarily to increases in auction prices in the PJM region, partially offset by decreases in capacity prices and higher load obligations in the NE region.

***Gas Supply Revenues*** increased $75 million due primarily to

- a net increase of $63 million in sales under the BGSS contract primarily due to higher sales volumes, and
- a net increase of $12 million related to sales to third parties, of which $23 million was due to higher average sales prices, partially offset by a decrease of $11 million due to lower volumes sold.

### Operating Expenses

**Energy Costs** represent the cost of generation, which includes fuel costs for generation as well as purchased energy in the market, and gas purchases to meet PSEG Power’s obligation under its BGSS contract with PSE&G. Energy Costs increased $6 million due to

***Gas costs*** increased $48 million due mainly to

- a net increase of $38 million in costs related to sales under the BGSS contract, of which $58 million was due to higher send out volumes, partially offset by a decrease of $20 million due to the lower average cost of gas, and
- a net increase of $8 million related to sales to third parties, of which $18 million was due to an increase in the average cost of gas, partially offset by a decrease of $10 million due to lower volumes sold.

***Generation costs*** decreased $42 million due primarily to

- a net decrease of $48 million due to net MTM gains in 2021 compared to MTM losses in 2020. Of this amount, there was a $32 million decrease due to changes in forward prices in 2021 as compared to 2020 coupled with a $16 million

decrease due to gains on positions reclassified to realized upon settlement in 2021 as compared to losses in 2020,

- a net decrease of $28 million in transmission costs primarily due to a $22 million impact from the transfer of responsibility for firm transmission services under BGS contracts from BGS suppliers to the EDCs, coupled with a $6 million decrease from changes in BGS and other load, and
- a decrease of $20 million due to a lower of cost or market adjustment recorded in the first quarter of 2020 on oil inventory caused by a decrease in oil demand and pricing,
- partially offset by a net increase of $46 million in fuel costs reflecting higher gas prices in the PJM, NY, and NE regions coupled with the utilization of higher volumes of coal in the NE region. This was partially offset by utilization of lower volumes of gas in the PJM region.

**Operation and Maintenance** decreased $19 million due primarily to higher planned outage costs in 2020 at our fossil and nuclear plants.

**Net Gains (Losses) on Trust Investments** increased $278 million due primarily to a $214 million decrease in net unrealized losses on equity investments in the NDT Fund, and a $60 million increase in net realized gains on NDT Fund investments.

**Other Income (Deductions)** increased $19 million primarily due to lower purchases of NOL tax benefits in 2021 under the New Jersey Technology Tax Benefit Transfer Program.

**Non-Operating Pension and OPEB Credits (Costs)** increased $4 million due to a $3 million decrease in interest cost and a $1 million increase in the expected return on plan assets.

**Interest Expense** decreased $7 million due primarily to debt maturities in April 2020.

**Income Tax Expense** increased $122 million due primarily to higher pre-tax income, an additional trust tax on the NDT qualified fund net gains, and the purchase of less New Jersey NOL tax benefits in 2021 as compared to 2020 under the New Jersey Technology Tax Benefit Transfer Program.

### LIQUIDITY AND CAPITAL RESOURCES

The following discussion of our liquidity and capital resources is on a consolidated basis, noting the uses and contributions, where material, of our two direct major operating subsidiaries.

### Operating Cash Flows

We continue to expect our operating cash flows combined with cash on hand and financing activities to be sufficient to fund planned capital expenditures and shareholder dividends.

For the three months ended March 31, 2021, our operating cash flow decreased $126 million as compared to the same period in 2020. The net decrease was primarily due to the net changes from our subsidiaries, as discussed below, offset by higher tax refunds in 2021 at the parent company and tax refunds in 2021 as compared to tax payments in 2020 at Energy Holdings.

Given the current economic challenges, PSE&G has informed both our residential customers and state regulators that all non-safety related service disconnections for non-payment will be temporarily suspended. In addition, the current economic conditions have adversely impacted residential and C&I customer payment patterns. During the moratorium, PSE&G has experienced a significant decrease in cash inflow and higher Accounts Receivable aging and an associated increase in bad debt expense, which we expect will extend beyond the duration of the coronavirus pandemic. While the impact on our results of operations, financial condition and cash flows for the three months ended March 31, 2021 was not material, a prolonged coronavirus pandemic and the associated economic impacts, which could extend beyond the duration of the pandemic, could materially impact cash from operations, Accounts Receivable and bad debt expense.

### PSE&G

PSE&G’s operating cash flow decreased $117 million from $635 million to $518 million for the three months ended March 31, 2021, as compared to the same period in 2020, due primarily to higher accounts receivable reflecting lower collections due to the economic impacts of the pandemic and the moratorium on collections, increases in electric energy and vendor payables, and higher tax payments in 2021. These decreases were partially offset by a net decrease in regulatory deferrals.

### PSEG Power

PSEG Power’s operating cash flow decreased $9 million from $484 million to $475 million for the three months ended March 31, 2021, as compared to the same period in 2020, due to a $99 million reduction related to cash collateral posting requirements, and tax payments in 2021 as compared to tax refunds in 2020, partially offset by higher earnings and a $41 million increase in the usage of fuels, materials and supplies.

### Short-Term Liquidity

PSEG meets its short-term liquidity requirements, as well as those of PSEG Power, primarily through the issuance of commercial paper and, from time to time, short-term loans. PSE&G maintains its own separate commercial paper program to meet its short-term liquidity requirements. Each commercial paper program is fully back-stopped by its own separate credit facilities.

We continually monitor our liquidity and seek to add capacity as needed to meet our liquidity requirements. Each of our credit facilities is restricted as to availability and use to the specific companies as listed below; however, if necessary, the PSEG facilities can also be used to support our subsidiaries’ liquidity needs.

In March 2020, PSEG entered into a $300 million, 364-day term loan agreement which was prepaid in January 2021. In March 2021, PSEG entered into a $500 million, 364-day variable rate term loan agreement. This term loan is not included in the credit facility amounts presented in the following table.

Our total credit facilities and available liquidity as of March 31, 2021 were as follows:

| Company/Facility Total Facility | As of March 31, 2021 Usage Millions | Available Liquidity |  |
| --- | ---: | ---: | ---: |
| PSEG | $1,500 | $167 | $1,333 |
| PSE&G | 600 | 18 | 582 |
| PSEG Power | 2,100 | 152 | 1,948 |
| **Total** | **$4,200** | **$337** | **$3,863** |

As of March 31, 2021, our credit facility capacity was in excess of our projected maximum liquidity requirements over our 12 month planning horizon, including access to capital to meet redemptions. Our maximum liquidity requirements are based on stress scenarios that incorporate changes in commodity prices and the potential impact of PSEG Power losing its investment grade credit rating from S&P or Moody’s, which would represent a three level downgrade from its current Moody’s rating and a two level downgrade from its current S&P rating. In the event of a deterioration of PSEG Power’s credit rating, certain of PSEG Power’s agreements allow the counterparty to demand further performance assurance. The potential additional collateral that we would be required to post under these agreements if PSEG Power were to lose its investment grade credit rating was approximately $818 million and $840 million as of March 31, 2021 and December 31, 2020, respectively.

For additional information, see Item 1. Note 12. Debt and Credit Facilities.

### Long-Term Debt Financing

During the next twelve months,

- PSEG has $300 million of 2.00% Senior Notes maturing in November 2021,
- PSE&G has $134 million of 9.25% Mortgage Bonds Series CC maturing in June 2021, and
- PSEG Power has $700 million of 3.00% Senior Notes maturing in June 2021 and $250 million of 4.15% Senior Notes maturing in September 2021. PSEG Power has a letter of credit backing $44 million of Pennsylvania Economic Development Financing Authority Variable Rate Demand Bonds which expires in March 2022.

PSEG, PSEG Power, Energy Holdings, PSEG LI and Services participate in a corporate money pool, an aggregation of daily cash balances designed to efficiently manage their respective short-term liquidity needs, which are accounted for as intercompany loans. Servco does not participate in the corporate money pool. Servco’s short-term liquidity needs are met through an account funded and owned by LIPA.

For additional information see Item 1. Note 12. Debt and Credit Facilities.

### Guarantor Financial Information

PSEG Power’s Senior Notes are fully and unconditionally guaranteed on a joint and several basis by its subsidiaries, PSEG Fossil LLC, PSEG Nuclear LLC and PSEG Energy Resources & Trade LLC. Each guarantor subsidiary is a wholly owned consolidated subsidiary of PSEG Power.

Summarized financial information is being presented, on a combined basis, only for PSEG Power (parent company) and the guarantors of PSEG Power’s Senior Notes, excluding investments in, and earnings (losses) from, subsidiaries that are not guarantors. All transactions between PSEG Power (parent company) and the guarantor subsidiaries are eliminated in the combined summarized financial information. The required disclosures for the year-to-date interim period and the most recent fiscal year are provided in the following tables.

|  | Three Months Ended March 31, 2021 Millions | Year Ended December 31, 2020 |
| --- | ---: | ---: |
| Operating Revenues (A) | $1,151 | $3,564 |
| Operating Income | $171 | $598 |
| Net Income | $162 | $597 |

(A) Operating Revenues include sales to affiliates of $498 million and $1,218 million, respectively for the three months ended March 31, 2021 and year ended December 31, 2020, respectively.

|  | As of March 31, 2021 Millions | As of December 31, 2020 |
| --- | ---: | ---: |
| Current Receivables from Subsidiaries and Affiliates | $2,525 | $2,350 |
| Total Current Assets | $3,397 | $3,365 |
| Noncurrent Receivables from Affiliates | $17 | $17 |
| Total Noncurrent Assets | $7,178 | $7,228 |
| Current Payables to Subsidiaries and Affiliates | $286 | $258 |
| Total Current Liabilities | $1,800 | $1,734 |
| Noncurrent Payables to Affiliates | $57 | $57 |
| Total Noncurrent Liabilities | $3,974 | $4,027 |

### Pension and NDT Fund Obligations

IRS minimum funding requirements for pension plans are determined based on the fund’s assets and liabilities at the end of a calendar year for the subsequent calendar year. In the event of a prolonged economic downturn associated with the ongoing coronavirus pandemic, our contributions to the pension plans may increase in future periods to meet IRS minimum funding requirements. PSEG had accumulated funding credits totaling approximately $600 million through 2020, which represent historical contributions in excess of IRS minimum funding requirements, and these credits can be applied to offset any future cash contribution obligations.

In addition, the NRC requires a biennial filing of the NDT fund balances against the decommissioning liability estimate. Any funding shortfalls are required to be cured prior to the next NRC reporting period. To the extent of a prolonged economic downturn associated with the ongoing coronavirus pandemic, our funding requirements may increase in future periods to meet NRC minimum funding requirements.

### Common Stock Dividends

On April 20, 2021, our Board of Directors declared a $0.51 dividend per share of common stock for the second quarter of 2021. This reflects an indicative annual dividend rate of $2.04 per share. We expect to continue to pay cash dividends on our common stock; however, the declaration and payment of future dividends to holders of our common stock will be at the discretion of the Board of Directors and will depend upon many factors, including our financial condition, earnings, capital requirements of our businesses, alternate investment opportunities, legal requirements, regulatory constraints, industry practice and other factors that the Board of Directors deems relevant. For additional information related to cash dividends on our common stock, see Item 1. Note 18. Earnings Per Share (EPS) and Dividends.

### Credit Ratings

If the rating agencies lower or withdraw our credit ratings, such revisions may adversely affect the market price of our securities and serve to materially increase our cost of capital and limit access to capital. Credit Ratings shown are for securities that we typically issue. Outlooks are shown for Issuer Credit Ratings and can be Stable, Negative, or Positive. There is no assurance that the ratings will continue for any given period of time or that they will not be revised by the rating agencies, if in their respective judgments, circumstances warrant. Each rating given by an agency should be evaluated independently of the other agencies’ ratings. The ratings should not be construed as an indication to buy, hold or sell any security.

|  | Moody’s (A) | S&P (B) |
| --- | --- | --- |
| **PSEG** |  |  |
| Outlook | **Stable** | **Stable** |
| Senior Notes | Baa1 | BBB |
| Commercial Paper | P2 | A2 |
| **PSE&G** |  |  |
| Outlook | **Stable** | **Stable** |
| Mortgage Bonds | Aa3 | A |
| Commercial Paper | P1 | A2 |
| **PSEG Power** |  |  |
| Outlook | **Stable** | **Stable** |
| Senior Notes | Baa1 | BBB |

(A) Moody’s ratings range from Aaa (highest) to C (lowest) for long-term securities and P1 (highest) to NP (lowest) for short-term securities.

(B) S&P ratings range from AAA (highest) to D (lowest) for long-term securities and A1 (highest) to D (lowest) for short-term securities.

### CAPITAL REQUIREMENTS

We expect that all of our capital requirements over the next three years will come from a combination of internally generated funds and external debt financing. There were no material changes to our projected capital expenditures at PSEG Power and Services as compared to amounts disclosed in our 2020 Form 10-K.

### PSE&G

During the three months ended March 31, 2021, PSE&G made capital expenditures of $586 million, primarily for T&D system reliability. This does not include expenditures for cost of removal, net of salvage, of $27 million, which are included in operating cash flows.

### PSEG Power

During the three months ended March 31, 2021, PSEG Power made capital expenditures of $36 million, excluding $10 million for nuclear fuel, primarily related to various nuclear and fossil projects.

### ACCOUNTING MATTERS

For information related to recent accounting matters, see Item 1. Note 2. Recent Accounting Standards.

## Market risk

As filed, 3,183 characters.

The risk inherent in our market-risk sensitive instruments and positions is the potential loss arising from adverse changes in commodity prices, equity security prices and interest rates as discussed in the Notes to Condensed Consolidated Financial Statements. It is our policy to use derivatives to manage risk consistent with business plans and prudent practices. We have a Risk Management Committee comprised of executive officers who utilize a risk oversight function to ensure compliance with our corporate policies and risk management practices.

Additionally, we are exposed to counterparty credit losses in the event of non-performance or non-payment. We have a credit management process, which is used to assess, monitor and mitigate counterparty exposure. In the event of non-performance or non-payment by a major counterparty, there may be a material adverse impact on our financial condition, results of operations or net cash flows.

### Commodity Contracts

The availability and price of energy-related commodities are subject to fluctuations from factors such as weather, environmental policies, changes in supply and demand, state and federal regulatory policies, market rules and other events. To reduce price risk caused by market fluctuations, we enter into supply contracts and derivative contracts, including forwards, futures, swaps and options with approved counterparties. These contracts, in conjunction with physical sales and other services, help reduce risk and optimize the value of owned electric generation capacity.

### Value-at-Risk (VaR) Models

VaR represents the potential losses, under normal market conditions, for instruments or portfolios due to changes in market factors, for a specified time period and confidence level. We estimate VaR across our commodity businesses.

MTM VaR consists of MTM derivatives that are economic hedges. The MTM VaR calculation does not include market risks associated with activities that are subject to accrual accounting, primarily our generating facilities and some load-serving activities.

The VaR models used are variance/covariance models adjusted for the change of positions with 95% and 99.5% confidence levels and a one-day holding period for the MTM activities. The models assume no new positions throughout the holding periods; however, we actively manage our portfolio.

From January through March 2021, MTM VaR was relatively stable between a low of $7 million and a high of $24 million at the 95% confidence level. The range of VaR was slightly wider for the three months ended March 31, 2021 as compared with the year ended December 31, 2020.

| 95% Confidence Level, Loss could exceed VaR one day in 20 days | MTM VaR Three Months Ended March 31, 2021 Millions | Year Ended December 31, 2020 |
| --- | ---: | ---: |
| Period End | $8 | $16 |
| Average for the Period | $14 | $10 |
| High | $24 | $18 |
| Low | $7 | $5 |
| **99.5% Confidence Level, Loss could exceed VaR one day in 200 days** |  |  |
| Period End | $13 | $24 |
| Average for the Period | $22 | $16 |
| High | $38 | $29 |
| Low | $11 | $8 |

See Item 1. Note 13. Financial Risk Management Activities for a discussion of credit risk.

## Controls and procedures

As filed, 1,638 characters.

### Disclosure Controls and Procedures

### PSEG, PSE&G and PSEG Power

We have established and maintain disclosure controls and procedures as defined under Rule 13a-15(e) and 15d-15(e) promulgated under the Securities Exchange Act of 1934, as amended (the “Exchange Act”) that are designed to provide reasonable assurance that information required to be disclosed in the reports that are filed or submitted under the Exchange Act is recorded, processed, summarized and reported and is accumulated and communicated to the Chief Executive Officer (CEO) and Chief Financial Officer (CFO) of each respective company, as appropriate, by others within the entities to allow timely decisions regarding required disclosure. We have established a disclosure committee which includes several key management employees and which reports directly to the CFO and CEO of each of PSEG, PSE&G and PSEG Power. The committee monitors and evaluates the effectiveness of these disclosure controls and procedures. The CFO and CEO of each of PSEG, PSE&G and PSEG Power have evaluated the effectiveness of the disclosure controls and procedures and, based on this evaluation, have concluded that disclosure controls and procedures at each respective company were effective at a reasonable assurance level as of the end of the period covered by the report.

### Internal Controls

### PSEG, PSE&G and PSEG Power

There have been no changes in internal control over financial reporting that occurred during the first quarter of 2021 that have materially affected, or are reasonably likely to materially affect, each registrant’s internal control over financial reporting.

## Risk factors

As filed, 704 characters.

The discussion of our business and operations in this Quarterly Report on Form 10-Q should be read together with the risk factors contained in Part I, Item 1A of our Form 10-K, which describes various risks and uncertainties that could have a material adverse impact on our business, prospects, financial position, results of operations or cash flows and could cause results to differ materially from those expressed elsewhere in this report. We expect that the risks and uncertainties described in this Form 10-Q and our Form 10-K will be further adversely impacted by the ongoing coronavirus pandemic and any related, sustained economic downturn, which could extend beyond the duration of the pandemic.

Filed May 5, 2021.
Source: SEC EDGAR, the filing index for accession 0000788784-21-000012. Last ingested by Listed: Nov 6, 2026, 17:31 ET. No prices; not investment advice.