# Stratus Properties Inc: Form 10-Q for the period ended Sep 30, 2009

- Company: [Stratus Properties Inc](/companies/strs.md) (CIK 885508)
- Form: 10-Q
- Filed: 2009-11-06
- Accepted by EDGAR: Nov 6, 2009, 16:32 ET
- Period: 2009-09-30
- Accession: 0000831259-09-000102
- Inline XBRL: no
- Main document: https://www.sec.gov/Archives/edgar/data/885508/000083125909000102/strs3q09_10q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/885508/000083125909000102/

## Management's discussion and analysis

As filed, 41,117 characters.

### OVERVIEW

*Management’s discussion and analysis presented below should be read in conjunction with our discussion and analysis of financial results contained in our 2008 Annual Report on Form 10-K (2008 Form 10-K) filed with the Securities and Exchange Commission (SEC) and with “Note 2. Revisions of Previously Issued Consolidated Financial Statements” included in Notes to Consolidated Financial Statements (unaudited) contained elsewhere in this Quarterly Report on Form 10-Q. The operating results summarized in this report are not necessarily indicative of our future operating results. All subsequent references to “Notes” refer to Notes to Consolidated Financial Statements (unaudited), unless otherwise stated.*

We are engaged in the acquisition, development, management, operations and sale of commercial, multi-family and residential real estate properties located primarily in the Austin, Texas area. We primarily generate revenues from sales of developed properties and through rental income from our commercial properties. Developed property sales can include an individual tract of land that has been developed and permitted for residential use or a developed lot with a home already built on it. We may, on occasion, sell properties under development or undeveloped properties, if opportunities arise that we believe will maximize overall asset values.

Our principal real estate holdings are in southwest Austin, Texas. The number of developed lots, developed or under development acreage and undeveloped acreage as of September 30, 2009, are presented in the following table.

| Austin | Developed Lots |  | Acreage Developed or Under Development Single Family | Multi- family | Commercial |  | Total | Undeveloped Single Family |  | Commercial | Total | Total Acreage |
| --- | ---: | --- | ---: | ---: | ---: | --- | ---: | ---: | --- | ---: | ---: | ---: |
| Barton Creek | 122 |  | 358 | 249 | 368 |  | 975 | 510 |  | 28 | 538 | 1,513 |
| Lantana | - |  | - | - | - |  | - | - |  | 223 | 223 | 223 |
| Circle C | 59 | a | - | - | 265 |  | 265 | 148 | a | 122 | 270 | 535 |
| W Austin Hotel |  |  |  |  |  |  |  |  |  |  |  |  |
| & Residences | - |  | - | - | 2 | b | 2 | - |  | - | - | 2 |
| San Antonio |  |  |  |  |  |  |  |  |  |  |  |  |
| Camino Real | - |  | - | - | - |  | - | - |  | 2 | 2 | 2 |
| Total | 181 |  | 358 | 249 | 635 |  | 1,242 | 658 |  | 375 | 1,033 | 2,275 |

a. Relates to Meridian, an 800-lot residential development.

b. Represents a city block in downtown Austin planned for a mixture of hotel, residential, retail, office and entertainment uses.

Our other Austin holdings at September 30, 2009, consisted of two 75,000-square-foot office buildings at 7500 Rialto Boulevard (7500 Rialto) located in our Lantana development, a 22,000-square-foot retail complex representing phase one of Barton Creek Village and two retail buildings totaling 21,000 square feet at the 5700 Slaughter project in the Circle C community.

The sharp decline in activity in the real estate market, among other factors, significantly impacted our consolidated financial results. In the third quarter of 2009, our revenues totaled $3.3 million and our net loss attributable to common stock totaled $1.6 million, compared with revenues of $6.9 million and a net loss attributable to common stock of $0.4 million for the third quarter of 2008. For the first nine months of 2009, our revenues totaled $8.4 million and our net loss attributable to common stock totaled $4.7 million, compared with revenues of $16.1 million and a net loss attributable to common stock of $1.9 million for the first nine months of 2008. Our financial condition and results of operations are highly dependent upon market conditions for real estate activity in Austin, Texas. Our future operating cash flows and, ultimately, our ability to develop our properties and expand our business will be largely dependent on the level of our real estate sales. In turn, these sales will be significantly affected by future real estate market conditions in Austin, Texas, including development costs, interest rate levels, the availability of credit to finance real estate transactions, demand for residential and commercial real estate, and regulatory factors including our land use and development entitlements.

Recent economic conditions have also resulted in a general decline in leasing activity across the United States (U.S.), and have caused vacancy rates to increase in most markets, including Austin, Texas. Investment sales activity in the U.S. declined sharply during 2008 because of, among other factors, limited availability and increased cost of financing, especially the absence of securitized debt, which was the source of heightened investment activity, and the resulting gap between buyer and seller expectations of value.

Periods of economic slowdown or recession, rising interest rates, tightening of the credit markets, declining demand for or increased supply of real estate, or the public perception that any of these events may occur can adversely affect our business. These conditions could result in a general decline in rents, which in turn would reduce revenue from leases. In addition, these conditions could lead to a decline in property values as well as a decline in funds invested in commercial real estate and related assets, which in turn may reduce revenues from leases and development fees.

U.S. credit markets have yet to fully recover, and this lingering problem is impacting the broader U.S. economy. Commercial real estate lenders have substantially tightened underwriting standards or have withdrawn from the lending market, materially impacting liquidity in the real estate debt markets, making financing terms for owners of retail properties less attractive, and in certain cases resulting in the unavailability of certain types of debt financing. Tighter lending standards and higher borrowing costs have exerted downward pressure on the value and liquidity of real estate assets which will impact the values we could obtain from the sale of our properties. These factors may make it more difficult for us to sell properties or may adversely affect the price we receive for properties that we do sell, as prospective buyers may experience increased costs of debt financing or difficulties in obtaining such financing. Our future performance will, in part, be dependent upon the recovery of the credit markets and the underlying strength of the U.S. economy.

### BUSINESS STRATEGY

Over the past several years, we have successfully worked cooperatively with the City of Austin (the City) to obtain approvals that allow the development of our properties to proceed in a timely manner while protecting the environment. We believe the desirable location and overall quality of our properties, in combination with the land use and development entitlements we have obtained, will under normal market conditions command a premium over the value of other Austin-area properties.

Our long-term success will depend on our ability to maximize the value of our real estate through obtaining required approvals that permit us to develop and sell our properties in a timely manner at a reasonable cost. We must incur significant development expenditures and secure additional permits prior to the development and sale of certain properties. In addition, we continue to pursue additional development opportunities, and currently believe we can obtain financing necessary for developing our properties, although our ability to obtain financing in the future may be impacted by current U.S. economic conditions. See “Risk Factors” located in Item 1A of our 2008 Form 10-K.

### REVISIONS OF PREVIOUSLY ISSUED CONSOLIDATED FINANCIAL STATEMENTS

As discussed in Note 2, an accounting matter was identified in connection with the preparation of our financial results for the year ended December 31, 2008, that required revisions of our consolidated financial statements for the three-month and nine-month periods ended September 30, 2008. Management’s discussion and analysis has been updated to discuss changes in comparative results of operations after considering the impact of the item discussed in Note 2.

### DEVELOPMENT AND OTHER ACTIVITIES

*W Austin Hotel & Residences.* In 2005, the City selected our proposal to develop a mixed-use project in downtown Austin immediately north of the new City Hall complex. The W Austin Hotel & Residences project includes an entire city block and is planned for a mixture of hotel, residential, retail, office and entertainment uses. In 2006, we acquired the property for $15.1 million. We have executed agreements with Starwood Hotels & Resorts Worldwide, Inc. for the development of a W Hotel & Residences on the site. In May 2007, we announced our proposed partnership with Canyon-Johnson Urban Fund II, L.P. (Canyon-Johnson) for the development of the W Austin Hotel & Residences project. The grand opening for the onsite sales center was held in conjunction with the groundbreaking ceremony in October 2007. Effective May 1, 2008, we entered into a joint venture with Canyon-Johnson for the development of the project (see Note 4). A construction loan with Corus Bank N.A. (Corus) was signed effective May 2, 2008. Construction of the $300 million project commenced in the second quarter of 2008 and is proceeding as scheduled.

On June 26, 2009, the construction loan agreement with Corus was assigned to a subsidiary of Stratus, which is managed by Stratus and Canyon-Johnson, in exchange for a pay down of $250,000 of the outstanding principal balance of $2.1 million. As a result, Corus was no longer the lender, and in the second quarter of 2009, we recognized a $0.2 million loss on extinguishment of debt, which includes the write-off of unamortized deferred loan costs in the amount of $2.1 million.

On October 21, 2009, the subsidiary assigned and transferred the project construction loan documents to Beal Bank Nevada (Beal Bank). In connection with the assignment, the joint venture executed an amended and restated loan agreement, an amended and restated promissory note and related loan documents with Beal Bank (Beal Bank loan agreement). Pursuant to the Beal Bank loan agreement, the joint venture may borrow up to an aggregate of $120 million to fund the construction, development and marketing costs of the W Austin Hotel & Residences project. An initial advance under the Beal Bank loan agreement of $3.4 million was made at closing.

As of September 30, 2009, capital contributions to the joint venture totaled $101.3 million, of which we contributed $42.2 million and Canyon-Johnson contributed $59.1 million. The next advance under the Beal Bank loan agreement is expected to occur in mid-2010 and thereafter advances are expected to be made monthly until the loan is fully funded. As a condition to further funding from the Beal Bank loan agreement, the joint venture must invest at least $180 million. Previously, when Corus was the construction lender, the joint venture was required to invest total equity of $128 million ($53 million from us and $75 million from Canyon-Johnson). As a result of changing construction lenders, $52 million of additional equity is now required. The joint venture is currently pursuing third parties to fund all or a portion of the $52 million. To the extent acceptable third-party or other financing is not secured, the joint venture may be obligated to fund the additional capital necessary to meet the $180 million pre-funding requirement under the Beal Bank loan agreement.

*Crestview Station.* In 2005, we formed a joint venture with Trammell Crow to acquire an approximate 74-acre tract at the intersection of Airport Boulevard and Lamar Boulevard in Austin, Texas, for $7.7 million. The property, known as Crestview Station, is a single-family, multi-family, retail and office development, which is located on the site of a future commuter rail line approved by City of Austin voters. With Trammell Crow, we have completed environmental remediation, which the State of Texas certified as complete in 2007, and permitting of the property. The initial phase of utility and roadway infrastructure is complete. Crestview Station sold substantially all of its multi-family and commercial properties in 2007 and one commercial site in the first quarter of 2008. The joint venture retained the single-family component of Crestview Station and one commercial site. The joint venture is currently processing permits to develop Crestview Station as a 450-unit transit-oriented neighborhood. At September 30, 2009, our investment in the Crestview Station project totaled $3.5 million and the joint venture partnership had $8.2 million of outstanding debt, of which we guarantee $1.4 million. To the extent the joint venture does not have funds available, we and Trammell Crow will equally fund monthly interest payments on the outstanding loan balance and scheduled principal payments beginning in 2011.

*Residential.* As of September 30, 2009, the number of our residential developed lots, lots under development and potential development by area are shown below (excluding lots and units associated with our Canyon-Johnson and Crestview Station joint ventures):

| Barton Creek: Calera: | Residential Lots Developed | Under Development | Potential Development a | Total |
| --- | ---: | ---: | ---: | ---: |
| Calera Court Courtyard Homes | 2 | - | - | 2 |
| Calera Drive | 8 | - | - | 8 |
| Verano Drive | 67 | - | - | 67 |
| Amarra Drive: |  |  |  |  |
| Phase I Lots | 7 | - | - | 7 |
| Phase II Lots | 35 | - | - | 35 |
| Phase II and III Townhomes | - | - | 221 | 221 |
| Phase III | - | 89 | - | 89 |
| Mirador Estate | 2 | - | - | 2 |
| Wimberly Lane Phase II | 1 | - | - | 1 |
| Section N Multi-familyb | - | - | 1,860 | 1,860 |
| Other Barton Creek Sections | - | - | 154 | 154 |
| Circle C: |  |  |  |  |
| Meridian | 59 | - | 57 | 116 |
| Total Residential Lots | 181 | 89 | 2,292 | 2,562 |

a. Our development of the properties identified under the heading “Potential Development” is dependent upon the approval of our development plans and permits by governmental agencies, including the City. Those governmental agencies may either not approve one or more development plans and permit applications related to such properties or require us to modify our development plans. Accordingly, our development strategy with respect to those properties may change in the future. The timing for development of these properties has not been determined. While we may be proceeding with approved infrastructure projects on some of these properties, they are not considered to be “under development” for disclosure in this table unless other development activities necessary to fully realize the properties’ intended final use are in progress or scheduled to commence in the near term.

b. Represents 1,860 potential units on 174 acres.

Calera. Calera is a residential subdivision with plat approval for 155 lots. During 2004, we began construction of 16 courtyard homes at Calera Court, the 16-acre initial phase of the Calera subdivision. The second phase of Calera, Calera Drive, consisting of 53 single-family lots, many of which adjoin the Fazio Canyons Golf Course, received final plat and construction permit approval in 2005. Construction of the final phase, known as Verano Drive, was completed in July 2008 and includes 71 single-family lots. As of September 30, 2009, two courtyard homes at Calera Court, eight lots at Calera Drive and 67 lots at Verano Drive remained unsold.

Amarra Drive. Amarra Drive Phase I, which is the initial phase of the Amarra Drive subdivision, was completed in 2007 and includes eight lots with sizes ranging from approximately one to four acres, some of which are course-side lots on the Fazio Canyons Golf Course and others are secluded lots adjacent to the Nature Conservancy of Texas. In 2008, we commenced development of Amarra Drive Phase II, which consists of 35 lots on 51 acres. Development was substantially completed in October 2008, but no sales have occurred.

Mirador Estate. The Mirador subdivision consists of 34 estate lots, with each lot averaging approximately 3.5 acres in size. As of September 30, 2009, two Mirador estate lots remained unsold.

Wimberly Lane. Wimberly Lane included two phases, with phase one consisting of 75 residential lots and phase two consisting of 47 residential lots. As of September 30, 2009, one Wimberly Lane lot remained unsold.

Circle C. We are developing the Circle C community based on the entitlements secured in our Circle C settlement with the City. Our Circle C settlement, as amended in 2004, permits development of 1.16 million square feet of commercial space, 504 multi-family units and 830 single family residential lots. Meridian is an 800-lot residential development at the Circle C community. Development of Meridian included our contracts with three national homebuilders to complete the construction and sales of 494 lots. As of September 30, 2009, 30 lots remained unsold and 24 lots are expected to be sold in the fourth quarter of 2009 for $1.6 million. The remaining six lots are expected to be sold for $0.4 million in the first quarter of 2010.

In 2006, we signed another contract with a national homebuilder for 42 additional lots. Development of those lots was substantially completed in April 2008. In June 2009, the contract was terminated by the homebuilder. As of the date the contract was terminated, there were 30 remaining lots. In connection with the termination, the homebuilder forfeited a deposit of $0.6 million, which we recorded as other income in the second quarter of 2009. We are currently pursuing development contracts with other homebuilders for the remaining lots. One lot was sold in August 2009 for $0.1 million and 29 lots remained unsold as of September 30, 2009. The final phase of Meridian is expected to consist of 57 one-acre lots.

*Commercial.* As of September 30, 2009, the number of square feet of our commercial property developed, under development and our potential development are shown below (excluding property associated with our Canyon-Johnson and Crestview Station joint ventures):

| Barton Creek: | Commercial Property Developed | Under Development | Potential Development a | Total |
| --- | ---: | ---: | ---: | ---: |
| Barton Creek Village Phase I | 22,000 | - | - | 22,000 |
| Barton Creek Village Phase II | - | - | 18,000 | 18,000 |
| Entry Corner | - | - | 5,000 | 5,000 |
| Amarra Retail/Office | - | - | 90,000 | 90,000 |
| Section N | - | - | 1,500,000 | 1,500,000 |
| Circle C: |  |  |  |  |
| Chase Ground Lease | 4,000 | - | - | 4,000 |
| Tract 106 | 21,000 | - | - | 21,000 |
| Tract 107 | - | 80,000 | - | 80,000 |
| Tract 110 | - | - | 760,000 | 760,000 |
| Tract 101 | - | - | 90,000 | 90,000 |
| Tract 102 | - | - | 25,000 | 25,000 |
| Tract 114 | - | - | 5,000 | 5,000 |
| Lantana: |  |  |  |  |
| 7500 Rialto | 150,000 | - | - | 150,000 |
| Advanced Micro Devices |  |  |  |  |
| Option Tracts | - | - | 760,000 | 760,000 |
| Tract GR1 | - | - | 325,000 | 325,000 |
| Tract G07 | - | - | 210,000 | 210,000 |
| Tract CS5 | - | - | 175,000 | 175,000 |
| Tract CS1-CS3 | - | - | 150,000 | 150,000 |
| Tract LR1 | - | - | 75,000 | 75,000 |
| Tract L04 | - | - | 70,000 | 70,000 |
| Austin 290 Tract | - | - | 20,000 | 20,000 |
| Total Square Feet | 197,000 | 80,000 | 4,278,000 | 4,555,000 |

a. Our development of the properties identified under the heading “Potential Development” is dependent upon the approval of our development plans and permits by governmental agencies, including the City. Those governmental agencies may either not approve one or more development plans and permit applications related to such properties or require us to modify our development plans. Accordingly, our development strategy with respect to those properties may change in the future. The timing for development of these properties has not been determined. While we may be proceeding with approved infrastructure projects on some of these properties, they are not considered to be “under development” for disclosure in this table unless other development activities necessary to fully realize the properties’ intended final use are in progress or scheduled to commence in the near term.

Barton Creek. The first phase of the Barton Creek Village includes a 22,000-square-foot retail complex and a 3,300-square-foot bank building within this retail complex. As of September 30, 2009, the retail complex was 84 percent leased and the bank building is leased through 2022.

Circle C. During the third quarter of 2008, we completed the construction of two retail buildings, totaling 21,000 square feet, at the 5700 Slaughter project. This retail project also includes a 4,000-square-foot bank building on an existing ground lease. Leasing for the two retail buildings is under way with 32 percent of the 21,000-square-foot retail complex leased as of September 30, 2009. We expect the 21,000-square-foot retail complex to be substantially leased by the end of 2009.

The Circle C community also includes Parkside Village, an 80,000-square-foot planned retail project. The project will be developed in two phases. The first phase will consist of a 34,000-square-foot building to accommodate a full-service restaurant and theater. The second phase will consist of three tilt-wall retail buildings at 14,775 square feet, 8,075 square feet and 7,600 square feet, and two pads available for ground leases. We are pursuing final permits and entitlements to position the project for commencement of construction when appropriate.

Lantana. Lantana is a partially developed, mixed-use real-estate development project. Lantana includes two 75,000-square-foot office buildings at 7500 Rialto. As of September 30, 2009, occupancy was 71 percent for the original office building and 94 percent for the second office building. We are actively pursuing tenants to fill the available office space at this property. As of September 30, 2009, we had remaining entitlements for approximately 1.0 million square feet of office and retail use on 223 acres. Regional utility and road infrastructure is in place with capacity to serve Lantana at full build-out permitted under our existing entitlements.

### RESULTS OF OPERATIONS

We are continually evaluating the development potential of our properties and considering opportunities to enter into transactions involving our properties. As a result, and because of numerous other factors affecting our business activities as described herein, our past operating results are not necessarily indicative of our future results.

Summary operating results follow (in thousands):

| Revenues: | Third Quarter 2009 | 2008 | Nine Months 2009 | 2008 |
| --- | ---: | ---: | ---: | ---: |
| Real estate operations | $2,181 | $5,751 | $5,070 | $12,786 |
| Commercial leasing | 1,163 | 1,158 | 3,296 | 3,278 |
| Total revenues | $3,344 | $6,909 | $8,366 | $16,064 |
| Operating loss | $(2,375) | $(1,147) | $(7,904) | $(4,270) |
| Benefit from income taxes | $844 | $268 | $2,448 | $660 |
| Net loss attributable to Stratus common stock | $(1,553) | $(447) | $(4,734) | $(1,851) |

We have two operating segments, “Real Estate Operations” and “Commercial Leasing” (see Note 10). The following is a discussion of our operating results by segment.

### Real Estate Operations

Summary operating results for real estate operations follow (in thousands):

| Revenues: | Third Quarter 2009 | 2008 | Nine Months 2009 | 2008 |
| --- | ---: | ---: | ---: | ---: |
| Developed property sales | $2,116 | $5,691 | $4,201 | $11,953 |
| Undeveloped property sales | - | - | - | 41 |
| Commissions, management fees and other | 65 | 60 | 869 | 792 |
| Total revenues | 2,181 | 5,751 | 5,070 | 12,786 |
| Cost of sales, including depreciation | (2,760) | (5,007) | (6,982) | (11,310) |
| General and administrative expenses | (1,134) | (1,482) | (3,636) | (4,538) |
| Operating loss | $(1,713) | $(738) | $(5,548) | $(3,062) |

21

*Developed Property Sales.* Residential property sales for the third-quarter and nine-month periods of 2009 and 2008 included the following (revenues in thousands):

| Barton Creek | Third Quarter 2009 Lots | Revenues | 2008 Lots | Revenues |
| --- | ---: | ---: | ---: | ---: |
| Calera Court Courtyard Homes | 1 | $ 549 | 1 | $ 643 |
| Verano Drive | 1 | 450 | 3 | 1,875 |
| Circle C |  |  |  |  |
| Meridian | 16 | 1,117 | 48 | 3,173 |
| Total Residential | 18 | $ 2,116 | 52 | $ 5,691 |

| Barton Creek | Nine Months 2009 Lots | Revenues | 2008 Lots | Revenues |  |
| --- | ---: | ---: | ---: | ---: | --- |
| Calera Court Courtyard Homes | 2 | $ 1,149 | 2 | $ 1,278 |  |
| Wimberly Lane Phase II |  |  |  |  |  |
| Standard Homebuilder | - | - | 1 | 265 | a |
| Verano Drive | 1 | 450 | 3 | 1,875 |  |
| Circle C |  |  |  |  |  |
| Meridian | 39 | 2,602 | 103 | 7,125 |  |
| Deerfieldb | - | - | 21 | 1,410 |  |
| Total Residential | 42 | $ 4,201 | 130 | $ 11,953 |  |

a. Includes $0.1 million for homebuilder contract termination fee.

b. In 2004, we acquired the Deerfield property in Plano, Texas, for $7.0 million. We executed agreements with a national homebuilder, whereby the homebuilder paid us $1.4 million for an option to purchase all 234 lots over 36 monthly take-downs. In 2005, we executed a revised agreement with the homebuilder, increasing the lot sizes and average purchase price to $67,150 based on a new total of 224 lots. In January 2008, we sold the final 21 lots for $1.4 million.

The decrease in developed property sales revenues to $2.1 million for the third quarter of 2009 and $4.2 million for the first nine months of 2009, from $5.7 million for the third quarter of 2008 and $12.0 million for the first nine months of 2008 resulted from a lower number of lots sold primarily caused by deterioration of demand and available financing in the real estate market as further discussed under “Overview.” Although real estate market conditions have resulted in fewer lot sales, we have not made significant changes to our lot prices.

*Cost of Sales.* Cost of sales totaled $2.8 million for the third quarter of 2009, $5.0 million for the third quarter of 2008, $7.0 million for the first nine months of 2009 and $11.3 million for the first nine months of 2008, and includes cost of property sold, ongoing project expenses and allocated overhead costs, partially offset by reductions for certain Municipal Utility District (MUD) reimbursements. Accordingly, while profit margins on developed property sales remain positive, the inclusion of ongoing project expenses and allocated overhead costs in cost of sales results in a negative gross margin. Most of the sales for the 2009 and 2008 periods were Circle C lots, which have lower profit margins than Barton Creek lots. Cost of sales also included reductions for Barton Creek MUD reimbursements totaling less than $0.1 million for the third quarter and first nine months of 2009 and $0.1 million for the first nine months of 2008.

We are projecting continued lower levels of lot sales in the next several quarters because of the continued weakness in the U.S. and Austin real estate markets.

*General and Administrative Expenses.* Consolidated general and administrative expenses increased to $1.8 million for the third quarter of 2009 from $1.7 million for the third quarter of 2008, and increased to $5.8 million for the first nine months of 2009 from $5.3 million for the first nine months of 2008, primarily because of higher fees for professional services associated with SEC filings. General and administrative expenses allocated to real estate operations decreased to $1.1 million for the third quarter of 2009 from $1.5 million for the third quarter of 2008, and decreased to $3.6 million for the first nine months of 2009 from $4.5 million for the first nine months of 2008 primarily as a result of a lower allocation of general and administrative expenses to the real estate operations segment in 2009 because of lower projected real estate operations revenues.

### Commercial Leasing

Summary commercial leasing operating results follow (in thousands):

|  | Third Quarter 2009 | 2008 | Nine Months 2009 | 2008 |
| --- | ---: | ---: | ---: | ---: |
| Rental income | $1,163 | $1,158 | $3,296 | $3,278 |
| Rental property costs | (788) | (944) | (2,405) | (2,683) |
| Depreciation | (353) | (382) | (1,051) | (1,064) |
| General and administrative expenses | (684) | (241) | (2,196) | (739) |
| Operating loss | $(662) | $(409) | $(2,356) | $(1,208) |

*Rental Income.* While rental income for the 2009 periods approximated the 2008 periods, rental income from 7500 Rialto was $0.1 million lower in each of the 2009 periods because of higher vacancies, compared to the 2008 periods; however, these 2009 decreases were offset by additional rental income from the new leases in 2009 at Barton Creek Village and 5700 Slaughter.

*Rental Property Costs.* Rental property costs decreased to $0.8 million for the third quarter of 2009 from $0.9 million for the third quarter of 2008 and $2.4 million for the first nine months of 2009 from $2.7 million for the first nine months of 2008. The decrease in rental property costs in the 2009 periods is primarily the result of a decrease in personnel and operating costs associated with the property management function, which was outsourced to a third party in the fourth quarter of 2008. The decrease in the 2009 nine-month period was partly offset by higher costs from 5700 Slaughter, which commenced operations in July 2008.

*General and Administrative Expenses.* General and administrative expenses from commercial leasing increased to $0.7 million for the third quarter of 2009 from $0.2 million for the third quarter of 2008, and increased to $2.2 million for the first nine months of 2009 from $0.7 million for the first nine months of 2008, primarily as a result of a lower allocation of general and administrative expenses to the real estate operations segment in 2009 because of lower projected real estate operations revenues.

### Non-Operating Results

*Interest Income and Other.* Interest income totaled $0.1 million in the third quarter of 2009, $0.3 million in the third quarter of 2008, $0.3 million in the first nine months of 2009 and $1.4 million in the first nine months of 2008. The decrease in interest income in the first nine months of 2009 primarily reflects $0.6 million less of Barton Creek MUD reimbursements. Interest income included interest on Barton Creek MUD reimbursements totaling $0.1 million in the third quarter of 2009, $0.2 million in the third quarter of 2008, $0.3 million in the first nine months of 2009 and $0.9 million in the first nine months of 2008. Additionally, the decrease in interest income reflects a decrease in average cash balances during the 2009 periods compared to the 2008 periods.

We recorded other income of $0.6 million in the first nine months of 2009 for a forfeited deposit in connection with the termination of a homebuilder contract for certain lots in the Circle C community.

*Loss on Extinguishment of Debt*. We recorded a loss on extinguishment of debt of $0.2 million in the first nine months of 2009, reflecting the assignment of the W Austin Hotel & Residences construction loan to a Stratus subsidiary (see Note 4).

*Gain (Loss) on Interest Rate Cap Agreement*. We recognized a loss on the interest rate cap agreement of less than $0.1 million in the third quarter of 2009, a gain of less than $0.1 million in the first nine months 2009, and losses of $0.1 million in the 2008 periods, reflecting the impact of changing interest rates on the fair value of this derivative instrument (see Note 5).

*Equity in Unconsolidated Affiliate’s (Loss) Income.* We account for our 50 percent interest in our unconsolidated affiliate, Crestview Station, using the equity method. Crestview Station sold substantially all of its multi-family and commercial properties in 2007 and one commercial site in the first quarter of 2008. Our equity in Crestview Station’s (losses) earnings decreased to $(0.1) million for the third quarter of 2009 from $0.1 million for the third quarter of 2008, and decreased to $(0.3) million for the first nine months of 2009 from $0.4 million for the first nine months of 2008. The decrease in our equity in Crestview Station’s (losses) earnings primarily reflects the losses recognized by Crestview Station in the 2009 periods, as there were no sales during the first nine months of 2009.

*Benefit from Income Taxes.* We recorded an income tax benefit of $0.8 million for the third quarter of 2009, $0.3 million for the third quarter of 2008, $2.4 million for the first nine months of 2009 and $0.7 million for the first nine months of 2008. The difference between our consolidated effective income tax rates for the first nine months of 2009 and 2008 and the U.S. federal statutory rate of 35 percent was primarily attributable to state income tax expense and other permanent items.

*Net Loss Attributable to Noncontrolling Interest in Subsidiary*. Net loss attributable to nonconrolling interest in subsidiary totaled less than $0.1 million in the third quarter of 2009, $0.1 million in the third quarter of 2008, $0.3 million in the first nine months of 2009 and $0.2 million in the first nine months of 2008 related to the W Austin Hotel & Residences project (see Note 4).

### CAPITAL RESOURCES AND LIQUIDITY

At September 30, 2009, we had $24.9 million in cash and cash equivalents and $31.8 million in availability under our $45 million revolving credit facility, which matures in May 2010. In May 2009, we began making additional capital contributions to the W Austin Hotel & Residences project joint venture. Through September 30, 2009, we have funded $42.2 million and Canyon-Johnson has funded $59.1 million. Without additional financing, the joint venture may be obligated to fund approximately $79 million for the project costs after October 1, 2009, until funds under the Beal Bank loan agreement are available. The joint venture is actively seeking other financing options to fund the balance of the project costs that will not be funded by the construction loan once we and Canyon-Johnson have funded the required capital commitments (see Notes 4 and 12).

### Comparison of Nine-Months 2009 and 2008 Cash Flows

Cash used in operating activities increased to $26.2 million during the first nine months of 2009, compared with $10.7 million during the first nine months of 2008, primarily because of a $7.8 million decrease in proceeds from developed property sales, a $10.7 million increase in cash used in development of real estate properties, a $1.7 million decrease in MUD reimbursements and a $1.3 million distribution of income from our unconsolidated affiliate, Crestview Station, received in the first nine months of 2008. As stated previously, the continued weakness in the U.S. real estate market has negatively affected sales of lots, and we expect this trend to continue in the near-term. Expenditures for purchases and development of real estate properties for the first nine months of 2009 and 2008 included development costs for properties held for sale, including the residential portion of the W Austin Hotel & Residences project ($26.6 million in 2009 and $10.4 million in 2008), and the Barton Creek, Lantana and Circle C communities. We received Barton Creek MUD reimbursements totaling $4.6 million in the first nine months of 2009 and $6.2 million in the first nine months of 2008. Capital expenditures for the W Austin Hotel & Residences project, including both residential and commercial leasing expenditures, are expected to approximate $26 million for the fourth quarter of 2009 and $110 million for the year 2010.

Cash used in investing activities totaled $13.3 million during the first nine months of 2009 and $8.6 million during the first nine months of 2008. Commercial leasing development expenditures for the first nine months of 2009 and 2008 included development costs for the W Austin Hotel & Residences project totaling $26.8 million in 2009 and $9.7 million in 2008. Other expenditures for commercial leasing properties primarily related to Barton Creek Village in the 2008 period. We also contributed capital of $1.5 million to Crestview Station in the first nine months of 2009 and received distributions representing a partial return of our investment in Crestview Station totaling $2.4 million in the first nine months of 2008. Crestview Station generated proceeds from sales in the 2008 period but had no sales or cash proceeds in the 2009 period. In addition, we received proceeds from matured U.S. treasury securities of $15.4 million in the first nine months of 2009.

Cash provided by financing activities totaled $47.3 million during the first nine months of 2009, which included $33.4 million of noncontrolling interest contributions from Canyon-Johnson for the W Austin Hotel & Residences project, $10.2 million in net borrowings from our revolving credit facility and $4.7 million in net borrowings from the Barton Creek Village term loan. Other debt repayments totaled $0.5 million, including a $250,000 payment to terminate the W Austin Hotel & Residences project loan with Corus (see “Development and Other Activities”). In the first nine months of 2009, we used $0.4 million to repurchase shares of our common stock on the open market (see below). Cash provided by financing activities totaled $15.3 million during the first nine months of 2008, which included $16.7 million of noncontrolling interest contributions from Canyon-Johnson for the W Austin Hotel & Residences project and $2.1 million of borrowings from the W Austin Hotel & Residences project loan, partly offset by $2.8 million of financing costs. In the first nine months of 2008, we used $0.5 million to repurchase shares of our common stock.

In 2001, our Board of Directors approved an open market share purchase program for up to 0.7 million shares of our common stock. During the third quarter of 2009, there were no purchases under this program. A total of 161,145 shares remain available under this program as of September 30, 2009. Our loan agreement with Comerica provides a limit of $6.5 million for common stock purchases after September 30, 2005, of which $0.9 million remained at September 30, 2009. The timing of future purchases of our common stock is dependent on many factors including the price of our common shares, our cash flows and financial position, and general economic and market conditions.

### Credit Facility and Other Financing Arrangements

At September 30, 2009, we had total debt of $76.0 million, compared with $63.4 million at December 31, 2008. Our debt outstanding at September 30, 2009 consisted of the following:

- $10.2 million of borrowings outstanding and $2.9 million of letters of credit issued under our $45.0 million revolving credit facility with Comerica, resulting in availability of approximately $31.8 million. The revolving credit facility matures in May 2010.
- $40.0 million of borrowings outstanding under seven unsecured term loans, which include two $5.0 million loans, two $8.0 million loans, a $7.0 million loan and two $3.5 million loans, all of which will mature in December 2011.
- $21.1 million of borrowings outstanding under the Lantana promissory note, which matures in January 2018.
- $4.7 million of borrowings outstanding under a term loan secured by Barton Creek Village. The note bears interest at 6.25 percent per annum and matures in April 2014. Payments of interest and principal are due monthly beginning May 1, 2009.

Pursuant to an October 21, 2009, loan agreement with Beal Bank, the joint venture for the W Austin Hotel & Residences may borrow up to an aggregate of $120 million to fund the construction, development and marketing costs. Amounts borrowed under the Beal Bank loan agreement will bear interest at an annual rate equal to The Wall Street Journal Prime Rate, as it changes from time to time, plus 6¼ percent. The outstanding principal is due at maturity on October 21, 2014 (see Note 12).

### NEW ACCOUNTING STANDARDS

Refer to Note 11 for discussion of new accounting standards.

### CAUTIONARY STATEMENT

Our discussion and analysis contains forward-looking statements regarding future reimbursements for infrastructure costs, future events related to financing and regulatory matters, projected capital expenditures, the expected results of our business strategy, and other plans and objectives of management for future operations and activities. Important factors that could cause actual results to differ materially from our expectations include economic and business conditions, business opportunities that may be presented to and pursued by us, changes in laws or regulations and other factors, many of which are beyond our control, and other factors that are described in more detail under “Risk Factors” located in our 2008 Form 10-K.

## Controls and procedures

As filed, 700 characters.

(a) Evaluation of disclosure controls and procedures. Our chief executive officer and chief financial officer, with the participation of management, have evaluated the effectiveness of our “disclosure controls and procedures” (as defined in Rules 13a-15(e) and 15(d)-15(e) under the Securities Exchange Act of 1934) and determined that our controls and procedures were effective as of the end of September 30, 2009.

(b) Changes in internal control. There was no change in our internal control over financial reporting that occurred during the quarter ended September 30, 2009, that has materially affected, or is reasonably likely to materially affect, our internal control over financial reporting.

Filed Nov 6, 2009.
Source: SEC EDGAR, the filing index for accession 0000831259-09-000102. Last ingested by Listed: Nov 12, 2026, 20:38 ET. No prices; not investment advice.
