# Freeport-Mcmoran Inc: Form 10-Q for the period ended Mar 31, 2010

- Company: [Freeport-Mcmoran Inc](/companies/fcx.md) (CIK 831259)
- Form: 10-Q
- Filed: 2010-05-07
- Accepted by EDGAR: May 7, 2010, 20:28 ET
- Period: 2010-03-31
- Accession: 0000831259-10-000029
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/831259/000083125910000029/fcx1q10_10q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/831259/000083125910000029/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2010-03-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Cost of revenue | 3 months, 2010-01-01 to 2010-03-31 | $2.19bn | us-gaap:CostOfRevenue |
| Selling, general and administrative | 3 months, 2010-01-01 to 2010-03-31 | $95.0m | us-gaap:SellingGeneralAndAdministrativeExpense |
| Operating income | 3 months, 2010-01-01 to 2010-03-31 | $2.05bn | us-gaap:OperatingIncomeLoss |
| Income tax | 3 months, 2010-01-01 to 2010-03-31 | $678.0m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2010-01-01 to 2010-03-31 | $1.22bn | us-gaap:ProfitLoss |
| Diluted EPS | 3 months, 2010-01-01 to 2010-03-31 | $2.00 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2010-01-01 to 2010-03-31 | $2.08 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2010-01-01 to 2010-03-31 | 473,000,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months, 2010-01-01 to 2010-03-31 | $1.82bn | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Dividends paid | 3 months, 2010-01-01 to 2010-03-31 | $66.0m | us-gaap:PaymentsOfDividendsCommonStock |
| Cash and equivalents | at 2010-03-31 | $3.75bn | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2010-03-31 | $8.57bn | us-gaap:AssetsCurrent |
| Total assets | at 2010-03-31 | $27.11bn | us-gaap:Assets |
| Current liabilities | at 2010-03-31 | $4.31bn | us-gaap:LiabilitiesCurrent |
| Total liabilities | at 2010-03-31 | $15.28bn | us-gaap:Liabilities |
| Long-term debt | at 2010-03-31 | $5.05bn | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2010-03-31 | $1.02bn | us-gaap:DebtCurrent |
| Shareholders' equity | at 2010-03-31 | $9.99bn | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 109,947 characters.

### OVERVIEW and OUTLOOK

*In Management’s Discussion and Analysis of Financial Condition and Results of Operations, “we,” “us” and “our” refer to Freeport-McMoRan Copper & Gold Inc. (FCX) and its consolidated subsidiaries. You should read this discussion in conjunction with our financial statements, the related Management’s Discussion and Analysis of Financial Condition and Results of Operations and the discussion of our Business and Properties in our Form 10-K for the year ended December 31, 2009, filed with the United States (U.S.) Securities and Exchange Commission (SEC). The results of operations reported and summarized below are not necessarily indicative of future operating results. References to “Notes” are Notes included in our Notes to Consolidated Financial Statements. Throughout Management's Discussion and Analysis of Financial Condition and Results of Operations all references to earnings or losses per share are on a diluted basis, unless otherwise noted.*

We are one of the world’s largest copper, gold and molybdenum mining companies in terms of reserves and production. Our portfolio of assets includes the Grasberg minerals district in Indonesia, significant mining operations in North and South America, and the Tenke Fungurume minerals district in the Democratic Republic of Congo (DRC). The Grasberg minerals district contains the largest single recoverable copper reserve and the largest single gold reserve of any mine in the world based on the latest available reserve data provided by third-party industry consultants. We also operate Atlantic Copper, our wholly owned copper smelting and refining unit in Spain.

Our significantly improved first-quarter 2010 results, compared with first-quarter 2009, primarily reflected higher realized copper prices, partly offset by lower copper sales volumes. Refer to “Consolidated Results” for further discussion of our consolidated financial results for the three-month periods ended March 31, 2010 and 2009.

Rising copper and gold prices throughout 2009 have enabled us to enhance our financial and liquidity position, allowing us to manage volatile conditions effectively. We have reduced debt and reinstated cash dividends to common shareholders, and are now focused on future growth opportunities. During first-quarter 2010, we made open-market debt purchases totaling $269 million at a cost of $293 million, and on April 1, 2010, we redeemed our $1 billion of outstanding Senior Floating Rate Notes due 2015. Additionally, in April 2010, our Board of Directors authorized an increase in FCX’s common stock dividend. Refer to “Capital Resources and Liquidity – Financing Activities” for further discussion. With the improved market conditions, we have also resumed certain project development activities at our North and South America copper mines. Refer to “Operations” for further discussion.

We view the long-term outlook for our business positively, supported by limitations on supplies of copper and by the requirements for copper in the world’s economy and will continue to adjust our operating strategy as market conditions change.

### Outlook

Consolidated sales from mines for the year 2010 are expected to approximate 3.8 billion pounds of copper, 1.8 million ounces of gold and 62 million pounds of molybdenum, including 830 million pounds of copper, 270 thousand ounces of gold and 15 million pounds of molybdenum for second-quarter 2010. Consolidated sales in the second half of 2010 are expected to be higher than the first half because of mine sequencing at Grasberg. These sales volume estimates are dependent on the achievement of targeted mining rates, the successful operation of production facilities, the impact of weather conditions and other factors.

Assuming average prices of $3.50 per pound of copper, $1,100 per ounce of gold and $15 per pound of molybdenum for the remainder of 2010 and current sales and cost estimates, we estimate our consolidated unit net cash costs (net of by-product credits and excluding Africa mining) for our copper mining operations would average approximately $0.88 per pound of copper for the year 2010. Quarterly unit net cash costs will vary with fluctuations in production volumes. The impact of price changes on consolidated unit net cash costs in 2010 would approximate $0.015 per pound for each $50 per ounce change in gold prices for the remainder of 2010, and $0.01 per pound for each $2 per pound change in molybdenum prices for the remainder of 2010. Estimated consolidated unit net cash costs are higher, compared with consolidated unit net cash costs of $0.55 per pound of copper in 2009, primarily because of lower projected copper and gold sales volumes from Grasberg, combined with increases in commodity-based input costs and foreign currency exchange rates. Refer to “Consolidated Results – Production and Delivery Costs” for further discussion of consolidated unit net cash costs.

Consolidated revenues, operating cash flows and net income vary significantly with fluctuations in the market prices of copper, gold and molybdenum, sales volumes and other factors. Based on projected consolidated sales volumes for 2010 and assuming average prices of $3.50 per pound of copper, $1,100 per ounce of gold and $15 per pound of molybdenum for the remainder of 2010, our consolidated operating cash flows for the year 2010 are expected to exceed $6 billion, net of an estimated $0.3 billion for working capital requirements. The impact of price changes on operating cash flows in 2010 would approximate $200 million for each $0.10 per pound change in copper prices, $40 million for each $50 per ounce change in gold prices and $23 million for each $1 per pound change in molybdenum prices.

Capital expenditures for the year 2010 are expected to approximate $1.7 billion, including $0.8 billion for major projects primarily associated with underground development activities at Grasberg, the sulfide ore project at El Abra and the sulphur burner facility at Safford. For 2009, capital expenditures totaled $1.6 billion, which included $0.8 billion for major projects. We have resumed certain project development activities at our North and South America copper mines (refer to “Operations” for further discussion) and a number of studies are ongoing, which may result in increased capital spending programs.

### COPPER, GOLD AND MOLYBDENUM MARKETS

The following graphs illustrate the movements in metals prices from January 2000 through April 2010. World prices for copper, gold and molybdenum have fluctuated significantly during this period. The London Metal Exchange (LME) spot copper price varied from a low of $0.60 per pound in 2001 to a high of $4.08 per pound in July 2008, the London gold price fluctuated from a low of approximately $256 per ounce in 2001 to a high of $1,213 per ounce in December 2009, and the *Metals Week* Molybdenum Dealer Oxide weekly average price ranged from $2.19 per pound in 2000 to a high of $39.25 per pound in June 2005. Copper, gold and molybdenum prices are affected by numerous factors beyond our control as described further in our “Risk Factors” contained in Part I, Item 1A of our Form 10-K for the year ended December 31, 2009.

\* Excludes Shanghai stocks, producer, consumer and merchant stocks.

This graph presents LME spot copper prices and reported stocks of copper at the LME and the New York Mercantile Exchange (COMEX) from January 2000 through April 2010. From 2006 through most of 2008, disruptions associated with strikes and other operational issues, combined with growing demand from China and other emerging economies resulted in low levels of inventory. Beginning in late 2008, slowing consumption led to increases in inventory levels; however, China’s increased buying activity contributed to a decline in exchange inventories during the first half of 2009. After reaching a low for the year in July 2009, inventories grew during the second half of 2009 with combined LME and COMEX stocks ending the year at approximately 592 thousand metric tons. At March 31, 2010, combined LME and COMEX stocks totaled approximately 606 thousand metric tons or less than two weeks of global consumption.

Turmoil in the U.S. financial markets and concerns about the global economy negatively impacted copper prices in late 2008, which declined to a four-year low of $1.26 per pound in December 2008; however, copper prices improved during 2009 as a result of strong Chinese import activity and supply limitations. During first-quarter 2010, LME spot copper prices ranged from $2.83 per pound to $3.55 per pound and averaged $3.29 per pound. While the near-term outlook is uncertain, we believe the underlying fundamentals of the copper business remain positive, supported by limited supplies from existing mines and the absence of significant new development projects. Future copper prices are expected to be volatile and are likely to be influenced by demand from China, economic activity in the U.S. and other industrialized countries, the timing of the development of new supplies of copper and production levels of mines and copper smelters. The LME spot copper price closed at $3.34 per pound on April 30, 2010, and declined further to $3.15 per pound on May 6, 2010.

This graph presents London gold prices from January 2000 through April 2010. Continued investment demand and potential weakness in the U.S. dollar are expected to support gold prices in 2010. During first-quarter 2010, gold prices ranged from approximately $1,058 per ounce to $1,153 per ounce and averaged $1,109 per ounce. London gold prices closed at approximately $1,179 per ounce on April 30, 2010.

This graph presents the *Metals Week* Molybdenum Dealer Oxide price from January 2000 through April 2010. In late 2008, molybdenum prices declined significantly as a result of the financial market turmoil and a decline in demand; however, molybdenum prices improved during 2009 supported by Chinese imports and supply reductions. During first-quarter 2010, the weekly average price of molybdenum ranged from approximately $11.75 per pound to approximately $18.60 per pound and averaged $15.73 per pound. The weekly average *Metals Week* Molybdenum Dealer Oxide price was $17.50 per pound on April 30, 2010.

### CONSOLIDATED RESULTS

| Financial Data (in millions, except per share amounts) | First Quarter 2010 |  | 2009 |  |
| --- | ---: | --- | ---: | --- |
| Revenuesa | $4,363 | b | $2,602 | b |
| Operating income | $2,048 | b | $672 | b,c |
| Net income | $1,215 |  | $207 |  |
| Net income attributable to noncontrolling interests | $270 |  | $104 |  |
| Net income attributable to FCX common stockholdersd | $897 | e | $43 | c |
| Diluted net income per share attributable to FCX common stockholders | $2.00 | e | $0.11 | c |
| Diluted weighted-average common shares outstanding | 473 | f | 401 |  |
| **FCX Mining Operating Data** |  |  |  |  |
| Copper (recoverable) |  |  |  |  |
| Production (millions of pounds) | 929 |  | 1,041 |  |
| Sales, excluding purchases (millions of pounds) | 960 |  | 1,020 |  |
| Average realized price per pound | $3.42 |  | $1.72 |  |
| Site production and delivery costs per poundg | $1.35 |  | $1.07 |  |
| Unit net cash costs per poundg | $0.81 |  | $0.66 |  |
| Gold (recoverable) |  |  |  |  |
| Production (thousands of ounces) | 449 |  | 595 |  |
| Sales, excluding purchases (thousands of ounces) | 478 |  | 545 |  |
| Average realized price per ounce | $1,110 |  | $904 |  |
| Molybdenum (recoverable) |  |  |  |  |
| Production (millions of pounds) | 17 |  | 14 |  |
| Sales, excluding purchases (millions of pounds) | 17 |  | 10 |  |
| Average realized price per pound | $15.09 |  | $11.52 |  |

a. Includes the impact of adjustments to provisionally priced concentrate and cathode sales recognized in prior periods. Refer to “Revenues” for further discussion.

b. Following is a summary of revenues and operating income (loss) by operating division (in millions):

|  | First-Quarter 2010 Revenues | Operating Income (Loss) | First-Quarter 2009 Revenues | Operating Income (Loss) |
| --- | ---: | ---: | ---: | ---: |
| North America copper mines | $1,054 | $508 | $618 | $(32) |
| South America mining | 1,069 | 632 | 702 | 264 |
| Indonesia mining | 1,459 | 892 | 1,122 | 689 |
| Africa mining | 249 | 109 | – | (19) |
| Molybdenum | 275 | 73 | 146 | (4) |
| Rod & Refining | 1,073 | 4 | 619 | 5 |
| Atlantic Copper Smelting & Refining | 633 | (11) | 292 | (11) |
| Corporate, other & eliminations | (1,449) | (159) | (897) | (220) |
| Total | $4,363 | $2,048 | $2,602 | $672 |

c. First-quarter 2009 operating income includes charges totaling $31 million ($31 million to net income attributable to FCX common stockholders or $0.08 per share) associated with adjustments to environmental obligations, $25 million ($22 million to net income attributable to FCX common stockholders or $0.05 per share) for restructuring and other charges associated with our revised operating plans and $19 million ($19 million to net income attributable to FCX common stockholders or $0.05 per share) for lower of cost or market (LCM) molybdenum inventory adjustments.

d. After net income attributable to noncontrolling interests in subsidiaries and preferred dividends.

e. First-quarter 2010 includes net losses on early extinguishment of debt totaling $23 million ($0.05 per share) associated with open-market purchases of our 8.25% Senior Notes and 8.375% Senior Notes. Refer to Note 6 for further discussion.

f. Weighted-average common shares outstanding reflects assumed conversion of our 6¾% Mandatory Convertible Preferred Stock (39 million shares) and also includes 17.9 million shares resulting from the redemption of our 5½% Convertible Perpetual Preferred Stock in September 2009 and 26.8 million shares of common stock sold in February 2009.

g. Reflects per pound weighted-average production and delivery costs and unit net cash costs (net of by-product credits) for all copper mines, excluding net noncash and other costs and Africa mining. For reconciliations of the per pound costs by operating division to production and delivery costs applicable to sales reported in our consolidated financial statements, refer to “Operations – Unit Net Cash Costs” and to “Product Revenues and Production Costs.”

### Revenues

Consolidated revenues include the sale of copper concentrates, copper cathodes, copper rod, gold, molybdenum and other metals by our North and South America copper mines, the sale of copper concentrates (which also contain significant quantities of gold and silver) by our Indonesia mining operation, the sale of copper cathodes and cobalt hydroxide by our Africa mining operation, the sale of molybdenum in various forms by our Molybdenum operations, and the sale of copper cathodes, copper anodes, and gold in anodes and slimes by Atlantic Copper. Consolidated revenues totaled $4.4 billion in first-quarter 2010, compared with $2.6 billion in first-quarter 2009. Following is a summary of changes in our consolidated revenues between periods (in millions):

|  |  |
| --- | ---: |
| First-quarter 2009 consolidated revenues | $2,602 |
| Higher sales price realizations from mining operations: |  |
| Copper | 1,632 |
| Gold | 98 |
| Molybdenum | 60 |
| (Lower) higher sales volumes from mining operations: |  |
| Copper | (103) |
| Gold | (61) |
| Molybdenum | 80 |
| Lower purchased copper and molybdenum | (4) |
| Lower adjustments for prior year provisionally priced sales | (133) |
| Higher Atlantic Copper revenues | 341 |
| Other, including intercompany eliminations | (149) |
| First-quarter 2010 consolidated revenues | $4,363 |

Consolidated revenues in first-quarter 2010 were favorably impacted by higher copper, gold and molybdenum prices, compared with first-quarter 2009. Realized copper prices increased to an average of $3.42 per pound in first-quarter 2010, compared with $1.72 per pound in first-quarter 2009; realized gold prices increased to an average of $1,110 per ounce in first-quarter 2010, compared with $904 per ounce in first-quarter 2009; and realized molybdenum prices increased to an average of $15.09 per pound in first-quarter 2010, compared with $11.52 per pound in first-quarter 2009.

Consolidated sales volumes in first-quarter 2010 totaled 960 million pounds of copper, 478 thousand ounces of gold and 17 million pounds of molybdenum, compared with 1.0 billion pounds of copper, 545 thousand ounces of gold and 10 million pounds of molybdenum in first-quarter 2009. Lower copper and gold sales volumes in first-quarter 2010 primarily reflect anticipated lower ore grades at Grasberg resulting from planned mine sequencing. Lower copper sales volumes were also impacted by decreased volumes at our South America mining operations, partly offset by additional volumes provided by the Tenke Fungurume mine. Higher molybdenum sales volumes in first-quarter 2010 reflected improved demand in the metallurgical and chemical sectors. Refer to “Operations” for further discussion.

During first-quarter 2010, approximately 47 percent of our mined copper was sold in concentrate, approximately 27 percent as cathodes and approximately 26 percent as rod (from our North America operations). Substantially all concentrate and cathode sales contracts at our copper mining operations provide final copper pricing in a specified future period (generally one to four months from the shipment date) based primarily on quoted LME prices. We receive market prices based on prices in the specified future period, which results in price fluctuations recorded through revenues until the date of settlement. We record revenues and invoice customers at the time of shipment based on then-current LME prices, which results in an embedded derivative on our provisional priced concentrate and cathode sales that is adjusted to fair value through earnings each period, using the period-end forward prices, until the date of final pricing. To the extent final prices are higher or lower than what was recorded on a provisional basis, an increase or decrease to revenues is recorded each reporting period until the date of final pricing. Accordingly, in times of rising copper prices, our revenues benefit from higher prices received for contracts priced at current market rates and also from an increase related to the final pricing of provisionally priced sales pursuant to contracts entered into in prior periods; in times of falling copper prices, the opposite occurs.

At December 31, 2009, we had provisionally priced copper sales at our copper mining operations totaling 378 million pounds of copper (net of intercompany sales and noncontrolling interests) recorded at an average of $3.34 per pound. Adjustments to the December 31, 2009, provisionally priced copper sales resulted in a net decrease to consolidated revenues of $4 million ($2 million to net income attributable to FCX common stockholders or less than $0.01 per share) in first-quarter 2010, compared with an increase of $128 million ($60 million to net income attributable to FCX common stockholders or $0.15 per share) in first-quarter 2009.

LME spot copper prices averaged $3.29 per pound in first-quarter 2010, compared with our average realized price of $3.42 per pound. A significant portion of our first-quarter 2010 consolidated copper sales were provisionally priced at the time of shipment and are subject to final pricing over the next several months. At March 31, 2010, we had provisionally priced copper sales at our copper mining operations totaling 372 million pounds of copper (net of intercompany sales and noncontrolling interests) recorded at an average of $3.53 per pound, subject to final pricing over the next several months. We estimate that each $0.05 change in the price realized from the March 31, 2010, price for provisionally priced sales would have a net impact on our 2010 consolidated revenues of approximately $25 million ($12 million to net income attributable to FCX common stockholders). The LME spot copper price closed at $3.34 per pound on April 30, 2010. Based on quarter-to-date average copper prices and assuming we apply the May 6, 2010, average forward curve price of $3.14 per pound to the March 31, 2010, provisionally priced sales, we would record a reduction to second-quarter 2010 revenues of approximately $130 million (approximately $60 million to net income).

### Production and Delivery Costs

Consolidated production and delivery costs increased to $1.9 billion in first-quarter 2010, compared with $1.6 billion in first-quarter 2009, primarily reflecting higher costs of concentrate purchases at Atlantic Copper associated with higher copper prices. Also impacting first-quarter 2010 production and delivery costs were higher commodity-based input costs at our mining operations.

Our copper mining operations require a significant amount of energy, principally electricity, diesel, coal and natural gas. Excluding Africa mining, for the year 2010 we expect energy costs to approximate 22 percent of our consolidated copper production costs, compared with approximately 20 percent in 2009, which reflects purchases of approximately 215 million gallons of diesel fuel; 5,800 gigawatt hours of electricity at our North and South America mines (we generate all of our power at our Indonesia mining operation); 800 thousand metric tons of coal for our coal power plant in Indonesia; and 1 million MMBTU (million british thermal units) of natural gas at certain of our North America mines.

Consolidated site production and delivery costs for our copper mining operations, excluding net noncash and other costs and Africa mining, averaged $1.35 per pound of copper in first-quarter 2010 compared with $1.07 per pound of copper in first-quarter 2009. Higher site production and delivery costs in first-quarter 2010, primarily reflected lower copper sales volumes at Grasberg and South America. Refer to “Operations – Unit Net Cash Costs” for further discussion of unit net cash costs associated with our operating divisions, and to “Product Revenues and Production Costs” for reconciliations of per pound costs by operating division to production and delivery costs applicable to sales reported in our consolidated financial statements. We expect to incorporate Africa mining in our consolidated unit net cash cost disclosures upon completion of ramp-up activities in the cobalt circuit (refer to “Operations – Africa Mining” for further discussion).

### Depreciation, Depletion and Amortization

Consolidated depreciation, depletion and amortization expense increased to $271 million in first-quarter 2010, compared with $232 million in first-quarter 2009, primarily reflecting higher expense at our Tenke Fungurume mine, which commenced initial copper production in late March 2009.

### LCM Inventory Adjustments

Inventories are required to be recorded at the lower of cost or market. In first-quarter 2009, we recognized charges of $19 million ($19 million to net income attributable to FCX common stockholders or $0.05 per share) for LCM inventory adjustments associated with our molybdenum inventories. There have been no further LCM inventory adjustments recorded since first-quarter 2009.

### Selling, General and Administrative Expenses

Consolidated selling, general and administrative expenses increased to $95 million in first-quarter 2010, compared with $62 million in first-quarter 2009, primarily reflecting higher incentive compensation costs. Adjustments to compensation costs attributable to prior-year financial results reduced general and administrative expenses by $9 million in first-quarter 2010 and $33 million in first-quarter 2009.

### Exploration and Research Expenses

Consolidated exploration and research expenses totaled $31 million in first-quarter 2010 compared with $30 million in first-quarter 2009. Exploration activities are being conducted near our existing mines with a focus on opportunities to expand reserves that will support additional future production capacity in the large mineral districts where we currently operate. Significantly expanded drilling activities in recent years were successful in providing reserve additions and in identifying potential additional ore adjacent to existing ore bodies. Results indicate opportunities for future potential reserve additions at Morenci, Sierrita and Bagdad in North America, at Cerro Verde and El Abra in South America and in the Tenke Fungurume district.

During 2010, exploration activities will continue to focus principally on the potential in our existing mineral districts, and spending is expected to approximate $100 million.

### Restructuring and Other Charges

In first-quarter 2009, we recognized net charges of $25 million ($22 million to net income attributable to FCX common stockholders or $0.05 per share) associated with revised operating plans, including contract termination costs, other project cancellation costs and charges for employee severance and benefits, partially offset by gains for pension and postretirement special benefits and curtailments.

### Interest Expense, Net

Consolidated interest expense (before capitalization) totaled $151 million in first-quarter 2010 and $176 million in first-quarter 2009. Lower interest expense in first-quarter 2010 primarily reflected the impact of net repayments of debt during 2009 and lower interest rates on our variable-rate debt.

Capitalized interest decreased to $6 million in first-quarter 2010, compared with $45 million in first-quarter 2009, primarily reflecting the completion of development activities for the initial project at our Tenke Fungurume mine.

### Losses on Early Extinguishment of Debt

During first-quarter 2010, we recorded losses on early extinguishment of debt totaling $27 million ($23 million to net income attributable to FCX common stockholders or $0.05 per share) associated with open-market purchases of our 8.25% Senior Notes and 8.375% Senior Notes. Refer to Note 6 for further discussion.

### Provision for Income Taxes

Our first-quarter 2010 income tax provision resulted from taxes on international operations ($597 million) and U.S. operations ($81 million). The difference between our consolidated effective income tax rate of 36 percent for first-quarter 2010 and the U.S. federal statutory rate of 35 percent was primarily attributable to the proportion of income earned in Indonesia, which was taxed at an effective tax rate of 43 percent.

Our first-quarter 2009 income tax provision resulted from taxes on international operations ($330 million) and U.S. operations ($1 million). During first-quarter 2009, we did not record a benefit for losses generated in the U.S., and those losses could not be used to offset income generated from international operations. These factors combined with the high proportion of income earned in Indonesia, taxed at an effective tax rate of 42 percent, caused our consolidated effective income tax rate of approximately 63 percent to be substantially higher than the U.S. federal statutory rate of 35 percent.

A summary of the approximate amounts in the calculation of our consolidated provision for income taxes for the first quarters of 2010 and 2009 follows (in millions, except percentages):

|  | First-Quarter 2010 Income (Loss)a | Effective Tax Rate | Income Tax (Provision) Benefit | First-Quarter 2009 Income (Loss)a | Effective Tax Rate | Income Tax (Provision) Benefit |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| U.S. | $329 | 25% b | $(81) | $(288) | – | $(1) |
| South America | 623 | 32% | (197) | 253 | 33% | (84) |
| Indonesia | 909 | 43% | (393) | 689 | 42% | (288) |
| Africa | 85 | 30% | (25) | (2) | 30% | 1 |
| Eliminations and other | (58) | N/A | 18 | (125) | N/A | 41 |
| Consolidated FCX | $1,888 | 36%c | $(678) | $527 | 63% | $(331) |

a. Represents income (loss) by geographic location before income taxes and equity in affiliated companies’ net earnings.

b. During first-quarter 2010 the “Patient Protection and Affordable Care Act” and the “Health Care and Education Reconciliation Act of 2010” (the Acts) were enacted. These Acts reduce the tax benefit available for Medicare Part D subsidies paid to us by the U.S. federal government; as a result, our first-quarter 2010 U.S. income tax provision includes a cumulative tax charge of $5 million.

c. Our estimated consolidated effective tax rate for the year 2010 will vary with commodity price changes and the mix of income from international and U.S. operations. Assuming average prices of $3.50 per pound of copper, $1,100 per ounce of gold and $15 per pound of molybdenum for the remainder of 2010 and projected sales volumes for the year, we estimate our annual consolidated effective tax rate will approximate 36 percent. However, this rate would range from 38 percent at an average price of $2.50 per pound for copper to 36 percent at an average price of $4.00 per pound for copper.

### OPERATIONS

### North America Copper Mines

We currently have six operating copper mines in North America – Morenci, Sierrita, Bagdad, Safford and Miami in Arizona, and Tyrone in New Mexico. All of these mining operations are wholly owned, except for Morenci, an unincorporated joint venture, in which we own an 85 percent undivided interest.

The North America copper mines include open-pit mining, sulfide ore concentrating, leaching and solution extraction/electrowinning (SX/EW) operations. In addition to copper, the Sierrita and Bagdad mines produce molybdenum as a by-product. A majority of the copper produced at our North America copper mines is cast into copper rod by our Rod & Refining operations. The remainder of our North America copper sales is primarily in the form of copper cathode or copper concentrate. Refer to Note 11 for further discussion of our reportable segment in the North America copper mines division.

Operating and Development Activities. In response to weak market conditions, operating plans at our North America copper mines were revised at the end of 2008 and in early 2009 to reduce costs, which included curtailed production rates and capital cost reductions. However, we have resumed certain project development activities; we have also restarted the Morenci mill and announced a ramp up of Morenci’s mining rates. Operating plans for the North America copper mines are being assessed and adjustments will be made based on market conditions.

*Morenci Mill Restart and Mine Ramp-up.* In March 2010, we restarted the Morenci mill to process available sulfide material currently being mined. Mill throughput is initially expected to approximate 30,000 metric tons per day increasing to 50,000 metric tons per day by 2011. We are also initiating plans for a staged ramp up at the Morenci mine from the current rate of 450,000 metric tons per day to 635,000 metric tons per day. These activities are expected to expose additional ore and enable Morenci’s annual copper production to increase by approximately 125 million pounds, beginning in 2011. Further increases to Morenci’s mining rate are being evaluated.

*Miami Restart.* We have restarted limited mining activities at the Miami copper mine in Arizona to improve efficiencies of ongoing reclamation projects associated with historical mining operations at the site. During the approximate five-year mine life, we expect to ramp up production at Miami to approximately 100 million pounds of copper per year by the second half of 2011. The capital investment for this project is expected to approximate $40 million, mostly for mining equipment.

*Safford Sulphur Burner.* We are restarting work on the sulphur burner at Safford, which will provide a more cost effective source of sulphuric acid used in SX/EW operations and reduce transportation costs. This project is expected to be complete during 2011 at a capital investment of approximately $150 million.

*Twin Buttes Acquisition.* In December 2009, we purchased property adjacent to our Sierrita operations. The property includes the Twin Buttes copper mine, which ceased operations in 1994, and contains mineralized material of approximately 0.7 billion metric tons with average grades of 0.43 percent for copper and 0.024 percent for molybdenum. The purchase provides significant synergies in the Sierrita minerals district, including the potential for expanded mining activities and access to material that can be used for Sierrita tailings and stockpile reclamation purposes. Studies have commenced to incorporate the Twin Buttes resources in our future plans to determine the optimum development plans for the district.

Operating Data. Following is summary operating data for the North America copper mines for the first quarters of 2010 and 2009:

| Operating Data, Net of Joint Venture Interest Copper (millions of recoverable pounds) | First Quarter 2010 | 2009 |
| --- | ---: | ---: |
| Production | 264 | 289 |
| Sales, excluding purchases | 291 | 301 |
| Average realized price per pound | $3.32 | $1.59 |
| Molybdenum (millions of recoverable pounds) |  |  |
| Productiona | 6 | 6 |
| **100% Operating Data** |  |  |
| SX/EW operations |  |  |
| Leach ore placed in stockpiles (metric tons per day) | 601,900 | 669,200 |
| Average copper ore grade (percent) | 0.24 | 0.30 |
| Copper production (millions of recoverable pounds) | 202 | 222 |
| Mill operations |  |  |
| Ore milled (metric tons per day) | 162,900 | 180,800 |
| Average ore grade (percent): |  |  |
| Copper | 0.30 | 0.35 |
| Molybdenum | 0.02 | 0.02 |
| Copper recovery rate (percent) | 85.7 | 85.2 |
| Production (millions of recoverable pounds): |  |  |
| Copper | 80 | 88 |
| Molybdenum | 6 | 6 |

a. Reflects by-product molybdenum production from the North America copper mines. Sales of by-product molybdenum are reflected in the Molybdenum division.

Copper sales volumes from our North America copper mines decreased to 291 million pounds in first-quarter 2010, compared with 301 million pounds in first-quarter 2009, primarily reflecting reduced operating rates at Morenci. However, as discussed above in “Operating and Development Activities,” we have restarted the Morenci mill and are initiating plans for a staged ramp up of Morenci’s mining rates.

Consolidated sales volumes from our North America copper mines are expected to approximate 1.0 billion pounds of copper for the year 2010, compared with 1.2 billion pounds of copper in 2009.

Unit Net Cash Costs. Unit net cash costs per pound of copper is a measure intended to provide investors with information about the cash-generating capacity of our mining operations expressed on a basis relating to the primary metal product for our respective operations. We use this measure for the same purpose and for monitoring operating performance by our mining operations. This information differs from measures of performance determined in accordance with generally accepted accounting principles (GAAP) in the U.S. and should not be considered in isolation or as a substitute for measures of performance determined in accordance with U.S. GAAP. This measure is presented by other mining companies, although our measure may not be comparable to similarly titled measures reported by other companies.

#### Gross Profit per Pound of Copper and Molybdenum

The following table summarizes unit net cash costs and gross profit per pound at the North America copper mines for the first quarters of 2010 and 2009. Refer to “Product Revenues and Production Costs” for an explanation of the “by-product” and “co-product” methods and a reconciliation of unit net cash costs per pound to production and delivery costs applicable to sales reported in our consolidated financial statements.

|  | First-Quarter 2010 By- Product Method | Co-Product Method Copper | Molyb- denuma | First-Quarter 2009 By- Product Method | Co-Product Method Copper | Molyb- denuma |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Revenues, excluding adjustments shown below | $3.32 | $3.32 | $13.93 | $1.59 | $1.59 | $9.71 |
| Site production and delivery, before net noncash |  |  |  |  |  |  |
| and other costs shown below | 1.31 | 1.20 | 7.40 | 1.32 | 1.26 | 4.28 |
| By-product creditsa | (0.26) | – | – | (0.18) | – | – |
| Treatment charges | 0.08 | 0.08 | – | 0.08 | 0.08 | – |
| Unit net cash costs | 1.13 | 1.28 | 7.40 | 1.22 | 1.34 | 4.28 |
| Depreciation, depletion and amortization | 0.27 | 0.25 | 0.63 | 0.24 | 0.23 | 0.21 |
| Noncash and other costs, net | 0.08 | 0.08 | 0.05 | 0.15 | 0.15 | 0.15 |
| Total unit costs | 1.48 | 1.61 | 8.08 | 1.61 | 1.72 | 4.64 |
| Revenue adjustments, primarily for hedging | – | – | – | 0.24 | 0.24 | – |
| Idle facility and other non-inventoriable costs | (0.06) | (0.06) | – | (0.13) | (0.13) | – |
| Gross profit (loss) per pound | $1.78 | $1.65 | $5.85 | $0.09 | $(0.02) | $5.07 |
| Copper sales (millions of recoverable pounds) | 291 | 291 |  | 301 | 301 |  |
| Molybdenum sales (millions of recoverable pounds)b |  |  | 6 |  |  | 6 |

a. Molybdenum by-product credits and revenues reflect volumes produced at market-based pricing and also include tolling revenues at Sierrita.

b. Reflects molybdenum produced by the North America copper mines.

Unit net cash costs (net of by-product credits) for our North America copper mines decreased to $1.13 per pound of copper in first-quarter 2010, compared with $1.22 per pound of copper in first-quarter 2009, primarily reflecting higher molybdenum credits ($0.08 per pound) resulting from higher molybdenum prices.

Some of our U.S. copper rod customers request a fixed market price instead of the COMEX average price in the month of shipment. We hedge this price exposure in a manner that allows us to receive market prices in the month of shipment while the customer pays the fixed price they requested. Because these contracts previously did not meet the criteria to qualify for hedge accounting, revenue adjustments in first-quarter 2009 primarily reflect unrealized gains on these copper derivative contracts.

Our operating North America copper mines have varying cost structures because of differences in ore grades and ore characteristics, processing costs, by-products and other factors. Based on current operating plans and assuming achievement of current sales estimates and an average price of $15 per pound of molybdenum for the remainder of 2010, we estimate that average unit net cash costs (net of by-product credits) for our North America copper mines would approximate $1.24 per pound of copper for the year 2010, compared with $1.11 per pound in 2009. Each $2 per pound change in the molybdenum price during the remainder of 2010 would have an approximate $0.03 per pound impact on the North America copper mines’ 2010 unit net cash costs.

### South America Mining

We have four operating copper mines in South America – Cerro Verde in Peru, and Candelaria, Ojos del Salado and El Abra in Chile. We own a 53.56 percent interest in Cerro Verde, an 80 percent interest in both Candelaria and Ojos del Salado and a 51 percent interest in El Abra.

South America mining includes open-pit and underground mines, sulfide ore concentrating, leaching and SX/EW operations. In addition to copper, the Cerro Verde mine produces molybdenum concentrates as a by-product, and the Candelaria and Ojos del Salado mines produce gold and silver as by-products. Production from our South America mines is sold as copper concentrate or copper cathode under long-term contracts. Our South America mines sell a portion of their copper concentrate and cathode inventories to Atlantic Copper, an affiliated smelter. Refer to Note 11 for further discussion of our reportable segment in the South America mining division.

Operating and Development Activities. In response to weak market conditions, operating plans at our South America mining operations were revised at the end of 2008 to reduce costs, which included capital spending reductions. We also temporarily curtailed the molybdenum circuit at Cerro Verde, which resumed in September 2009. We have resumed certain project development activities, including the El Abra sulfide project and the Cerro Verde mill optimization project.

*El Abra Sulfide.* We have resumed construction activities associated with the development of a large sulfide deposit at El Abra to extend its mine life by over 10 years. Production from the sulfide ore, which will ramp up to approximately 300 million pounds of copper per year, is expected to begin in 2012 and will replace currently depleting oxide copper production. The aggregate capital investment for this project is expected to total $725 million through 2015, of which approximately $535 million is for the initial phase of the project expected to be completed in 2012. Aggregate project costs of $110 million have been incurred as of March 31, 2010, of which $35 million was incurred during first-quarter 2010.

In addition, we have initiated studies for a potential milling operation at El Abra to process additional sulfide material and to achieve higher recoveries.

*Cerro Verde Expansion.* We have commenced a project to optimize throughput at the existing Cerro Verde concentrator. This project, which is expected to be completed by the end of 2010, is designed to add 30 million pounds of additional copper production per year by increasing mill throughput from 108,000 metric tons of ore per day to 120,000 metric tons of ore per day. The aggregate capital investment for this project is expected to total approximately $50 million.

Reserve additions in recent years have provided opportunities to potentially more than double the existing facility’s capacity; accordingly, we are evaluating the potential for a large scale concentrator expansion at Cerro Verde. A feasibility study is expected to be completed in the first half of 2011.

As reported in Note 14 of our report on Form 10-K for the year ended December 31, 2009, Cerro Verde was notified by SUNAT, the Peruvian national tax authority of its intent to assess mining royalties related to the minerals processed by the Cerro Verde concentrator, which was added to Cerro Verde’s processing facilities in late 2006. In August 2009, Cerro Verde received a formal assessment approximating $50 million in connection with its alleged obligations for mining royalties and fines for the period from October 2006 through December 2007. In April 2010, SUNAT issued a ruling denying Cerro Verde’s protest of the assessment, and Cerro Verde plans to appeal this decision. Also in April 2010, Cerro Verde received a formal assessment approximating $40 million in royalties for the year 2008.

Cerro Verde is challenging these royalties because its stability agreement with the Peruvian government exempts from royalties all minerals extracted from its mining concession, irrespective of the method used for processing those minerals. No amounts have been accrued for this contingency. The full amount of royalties and fines now claimed by the revenue authorities is approximately $90 million. If Cerro Verde is ultimately found responsible for those royalties, it will also be liable for interest, which accrues at rates that range from 6 to 18 percent based on the year accrued and the currency in which the amounts would be payable.

In April 2010, there was a major earthquake in Chile that resulted in significant damages in certain regions of the country. Our operations were not significantly affected. As a result of the earthquake, the Chilean government is proposing to temporarily increase mining royalties to help fund reconstruction activities. The proposed measures require legislative approval. We continue to monitor the activity associated with these proposals and their potential impact on our financial results.

Operating Data. Following is summary operating data for our South America mining operations for the first quarters of 2010 and 2009:

| Copper (millions of recoverable pounds) | First Quarter 2010 | 2009 |
| --- | ---: | ---: |
| Production | 322 | 348 |
| Sales | 307 | 350 |
| Average realized price per pound | $3.46 | $1.76 |
| Gold (thousands of recoverable ounces) |  |  |
| Production | 19 | 23 |
| Sales | 19 | 23 |
| Average realized price per ounce | $1,113 | $902 |
| Molybdenum (millions of recoverable pounds) |  |  |
| Productiona | 2 | 1 |
| SX/EW operations |  |  |
| Leach ore placed in stockpiles (metric tons per day) | 255,800 | 250,500 |
| Average copper ore grade (percent) | 0.44 | 0.45 |
| Copper production (millions of recoverable pounds) | 133 | 137 |
| Mill operations |  |  |
| Ore milled (metric tons per day) | 180,100 | 182,400 |
| Average ore grade:b |  |  |
| Copper (percent) | 0.62 | 0.68 |
| Molybdenum (percent) | 0.02 | 0.02 |
| Copper recovery rate (percent) | 89.2 | 88.9 |
| Production (recoverable): |  |  |
| Copper (millions of pounds) | 189 | 211 |
| Gold (thousands of ounces) | 19 | 23 |
| Molybdenum (millions of pounds) | 2 | 1 |

a. Reflects by-product molybdenum production from our Cerro Verde copper mine. Sales of by-product molybdenum are reflected in the Molybdenum division.

b. Average ore grades of gold produced at our South America mining operations rounds to less than 0.001 grams per metric ton.

Copper sales from our South America mining operations decreased to 307 million pounds in first-quarter 2010, compared with 350 million pounds in first-quarter 2009, primarily reflecting lower ore grades at Candelaria and the timing of shipments at Cerro Verde and El Abra.

Consolidated sales volumes from South America mining are expected to approximate 1.3 billion pounds of copper and 100 thousand ounces of gold, compared with 1.4 billion pounds of copper and 90 thousand ounces of gold in 2009. Projected copper sales volumes for 2010 are lower than 2009 primarily reflecting anticipated lower ore grades at El Abra.

Unit Net Cash Costs. Unit net cash costs per pound of copper is a measure intended to provide investors with information about the cash-generating capacity of our mining operations expressed on a basis relating to the primary metal product for our respective operations. We use this measure for the same purpose and for monitoring operating performance by our mining operations. This information differs from measures of performance determined in accordance with U.S. GAAP and should not be considered in isolation or as a substitute for measures of performance determined in accordance with U.S. GAAP. This measure is presented by other mining companies, although our measure may not be comparable to similarly titled measures reported by other companies.

#### Gross Profit per Pound of Copper

The following table summarizes unit net cash costs and gross profit per pound at the South America mining operations for the first quarters of 2010 and 2009. Unit net cash costs per pound of copper are reflected under the by-product and co-product methods as the South America mining operations also had small amounts of molybdenum, gold and silver sales. Refer to “Product Revenues and Production Costs” for an explanation of the “by-product” and “co-product” methods and a reconciliation of unit net cash costs per pound to production and delivery costs applicable to sales reported in our consolidated financial statements.

|  | First-Quarter 2010 By-Product Method | Co-Product Method | First-Quarter 2009 By-Product Method | Co-Product Method |
| --- | ---: | ---: | ---: | ---: |
| Revenues, excluding adjustments shown below | $3.46 | $3.46 | $1.76 | $1.76 |
| Site production and delivery, before net noncash |  |  |  |  |
| and other costs shown below | 1.20 | 1.14 | 1.00 | 0.92 |
| By-product credits | (0.17) | – | (0.11) | – |
| Treatment charges | 0.15 | 0.15 | 0.14 | 0.14 |
| Unit net cash costs | 1.18 | 1.29 | 1.03 | 1.06 |
| Depreciation, depletion and amortization | 0.19 | 0.19 | 0.18 | 0.17 |
| Noncash and other costs, net | 0.01 | 0.01 | 0.02 | 0.02 |
| Total unit costs | 1.38 | 1.49 | 1.23 | 1.25 |
| Revenue adjustments, primarily for pricing on |  |  |  |  |
| prior period open sales | (0.01) | (0.01) | 0.25 | 0.25 |
| Other non-inventoriable costs | (0.03) | (0.02) | (0.02) | (0.02) |
| Gross profit per pound | $2.04 | $1.94 | $0.76 | $0.74 |
| Copper sales (millions of recoverable pounds) | 307 | 307 | 350 | 350 |

Unit net cash costs (net of by-product credits) for our South America mining operations increased to $1.18 per pound of copper in first-quarter 2010, compared with $1.03 per pound in first-quarter 2009, primarily reflecting higher site production and delivery costs ($0.20 per pound) associated with lower sales volumes and the impact of increased profit sharing with employees and governments at Cerro Verde because of higher copper prices. Partly offsetting higher site production and delivery costs were higher by-product credits ($0.06 per pound) primarily associated with higher gold and molybdenum prices.

Our South America mines have varying cost structures because of differences in ore grades and ore characteristics, processing costs, by-products and other factors. Assuming achievement of current sales volume and cost estimates for the remainder of 2010, we estimate that average unit net cash costs (net of by-product credits) for our South America mining operations would approximate $1.20 per pound of copper in 2010, compared with $1.12 per pound in 2009.

### Indonesia Mining

Indonesia mining includes PT Freeport Indonesia’s Grasberg minerals district. We own 90.64 percent of PT Freeport Indonesia, including 9.36 percent owned through our wholly owned subsidiary, PT Indocopper Investama.

PT Freeport Indonesia produces copper concentrates, which contain significant quantities of gold and silver. Substantially all of PT Freeport Indonesia’s copper concentrates are sold under long-term contracts, of which approximately one-half is sold to affiliated smelters, Atlantic Copper and PT Smelting (PT Freeport Indonesia’s 25-percent owned copper smelter and refinery in Indonesia) and the remainder to other customers.

PT Freeport Indonesia operates under an agreement, called a Contract of Work, with the Government of Indonesia that allows us to conduct exploration, mining and production activities in a 24,700-acre area called Block A located in Papua, Indonesia. Under the Contract of Work, PT Freeport Indonesia also conducts exploration activities in an approximate 500,000-acre area called Block B in Papua. All of PT Freeport Indonesia’s proven and probable mineral reserves and current mining operations, including the Grasberg minerals district, are located in Block A.

We have established certain unincorporated joint ventures with Rio Tinto plc (Rio Tinto), an international mining company with headquarters in London, England. Pursuant to the joint venture agreement, Rio Tinto has a 40 percent interest in certain assets and future production exceeding specified annual amounts of copper, gold and silver through 2021 in Block A of PT Freeport Indonesia’s Contract of Work, and, after 2021, a 40 percent interest in all production from Block A.

Operating and Development Activities. We have several projects in progress in the Grasberg minerals district, including development of the large-scale, high-grade underground ore bodies located beneath and adjacent to the

Grasberg open pit. In addition, we have completed the feasibility study for the Deep Mill Level Zone (DMLZ). Based on current estimates, we expect aggregate expenditures for underground mine development in the Grasberg minerals district to average $525 million per year during the next five years. These costs will be shared with Rio Tinto in accordance with our joint venture agreement. Considering the long-term nature and large size of these projects, actual costs could differ materially from these estimates.

In addition to the underground mine development costs, our current mine development plans include approximately $3 billion of capital expenditures at our processing facilities to optimize the handling of underground ore types once Grasberg open-pit operations cease. Substantially all of these expenditures will be made between 2017 and 2029. We continue to review our mine development and processing plans to maximize the value of our reserves.

The following discussion provides additional information on our current Indonesia mining projects, including the continued development of the Common Infrastructure project, the Grasberg Block Cave and Big Gossan underground mines, a further expansion of the Deep Ore Zone (DOZ) underground mine and development of the DMLZ ore body.

*Common Infrastructure and Grasberg Block Cave.* In 2004, PT Freeport Indonesia commenced its Common Infrastructure project to provide access to its large undeveloped underground ore bodies located in the Grasberg minerals district through a tunnel system located approximately 400 meters deeper than its existing underground tunnel system. In addition to providing access to our underground ore bodies, the tunnel system will enable PT Freeport Indonesia to conduct future exploration in prospective areas associated with currently identified ore bodies. The tunnel system has reached the Big Gossan terminal and we are proceeding with development of the lower Big Gossan infrastructure. We have also advanced development of the Grasberg spur and have completed the tunneling required to reach the Grasberg underground ore body. During first-quarter 2010, we continued development of the Grasberg Block Cave terminal infrastructure and mine access. The DMLZ Spur has reached the DMLZ terminal area and development continues on terminal infrastructure and mine access.

In 2008, we completed the feasibility study for the development of the Grasberg Block Cave underground mine, which accounts for over one-third of our reserves in Indonesia. Production at the Grasberg Block Cave mine is currently scheduled to commence at the end of mining the Grasberg open pit, which is expected to continue until mid-2016. The timing of the underground Grasberg Block Cave mine development will continue to be assessed.

Based on the 2008 feasibility study, aggregate mine development capital for the Grasberg Block Cave mine and associated Common Infrastructure is expected to approximate $3.6 billion to be incurred between 2008 and 2021, with PT Freeport Indonesia’s share totaling approximately $3.4 billion. Aggregate project costs totaling $154 million have been incurred through March 31, 2010, of which $27 million was incurred during first-quarter 2010. Targeted production rates once the Grasberg Block Cave mining operation reaches full capacity are expected to approximate 160,000 metric tons of ore per day.

*Big Gossan.* The Big Gossan underground mine is a high-grade deposit located near PT Freeport Indonesia’s existing milling complex. The Big Gossan mine is being developed as an open-stope mine with backfill consisting of mill tailings and cement, an established mining methodology expected to be higher cost than the block-cave method used at the DOZ mine. Production is designed to ramp up to 7,000 metric tons of ore per day by late 2012 (equal to average annual aggregate incremental production of 125 million pounds of copper and 65,000 ounces of gold, with PT Freeport Indonesia receiving 60 percent of these amounts). The aggregate capital investment for this project is currently estimated at approximately $0.5 billion, of which $393 million has been incurred through March 31, 2010, including $16 million during first-quarter 2010.

*DOZ Expansion.* In mid-2007, PT Freeport Indonesia completed an expansion of the DOZ underground operation to allow a sustained rate of 50,000 metric tons of ore per day. PT Freeport Indonesia’s further expansion of the DOZ mine to 80,000 metric tons of ore per day is essentially complete. The capital cost for this expansion approximated $100 million, with PT Freeport Indonesia’s 60 percent share totaling approximately $60 million. The success of the development of the DOZ mine, one of the world’s largest underground mines, provides confidence in the future development of PT Freeport Indonesia’s large-scale undeveloped underground ore bodies.

*DMLZ.* The DMLZ ore body lies below the DOZ mine at the 2,590-meter elevation and represents the downward continuation of mineralization in the Ertsberg East Skarn system and neighboring Ertsberg porphyry. The DMLZ feasibility study was completed in fourth-quarter 2009. We plan to mine the ore body using a block-cave method with production beginning in 2015, near completion of mining at the DOZ. Drilling efforts continue to determine the extent of this ore body. We continue to develop the Common Infrastructure project and tunnels from mill level. In 2009, we completed a portion of the spur to the DMLZ mine and reached the edge of the DMLZ terminal. Aggregate mine development capital costs for the DMLZ are expected to approximate $2.1 billion with PT Freeport Indonesia’s share totaling approximately $1.2 billion, which are expected to be incurred from 2009 to 2020. Aggregate project costs totaling $50 million have been incurred through March 31, 2010, including $25 million in first-quarter 2010. Targeted production rates once the DMLZ mining operation reaches full capacity are expected to approximate 80,000 metric tons of ore per day.

Since July 2009, there have been a series of shooting incidents along the road leading to our mining and milling operations at the Grasberg minerals district, including an incident in January 2010. In connection with these incidents there were three fatalities in July 2009, and there have been several injuries. The Indonesian government has responded with additional security forces and expressed a strong commitment to protect the safety of the community and our operations. The investigation of these matters is continuing, and we have taken precautionary measures, including limiting use of the road to secured convoys. Our mining and milling activities have continued uninterrupted; however, prolonged limitations on access to the road could adversely affect operations at the mine. See “Risk Factors” contained in Part I, Item 1A of our Form 10-K for the year ended December 31, 2009, for further discussion of these matters.

Operating Data. Following is summary operating data for our Indonesia mining operations for the first quarters of 2010 and 2009:

| Consolidated Operating Data, Net of Joint Venture Interest Copper (millions of recoverable pounds) | First Quarter 2010 | 2009 |
| --- | ---: | ---: |
| Production | 279 | 404 |
| Sales | 296 | 369 |
| Average realized price per pound | $3.51 | $1.80 |
| Gold (thousands of recoverable ounces) |  |  |
| Production | 429 | 570 |
| Sales | 458 | 521 |
| Average realized price per ounce | $1,110 | $904 |
| **100% Operating Data** |  |  |
| Ore milled (metric tons per day): |  |  |
| Grasberg open pita | 155,100 | 165,000 |
| DOZ underground minea | 78,900 | 72,400 |
| Total | 234,000 | 237,400 |
| Average ore grade: |  |  |
| Copper (percent) | 0.78 | 1.12 |
| Gold (grams per metric ton) | 0.87 | 1.13 |
| Recovery rates (percent): |  |  |
| Copper | 88.2 | 90.7 |
| Gold | 79.0 | 81.9 |
| Production (recoverable): |  |  |
| Copper (millions of pounds) | 308 | 456 |
| Gold (thousands of ounces) | 466 | 619 |

a. Amounts represent the approximate average daily throughput processed at PT Freeport Indonesia’s mill facilities from each producing mine.

At Grasberg the sequencing in mining areas with varying ore grades causes fluctuations in the timing of ore production resulting in varying quarterly and annual sales of copper and gold. PT Freeport Indonesia’s share of sales decreased to 296 million pounds of copper and 458 thousand ounces of gold in first-quarter 2010, compared with 369 million pounds of copper and 521 thousand ounces of gold in first-quarter 2009, as a result of mining in a lower grade section of the Grasberg open pit.

Anticipated changes in ore grade throughout the year are expected to result in significant variability in quarterly volumes, with higher copper and gold grades expected by fourth-quarter 2010. For the year 2010, PT Freeport Indonesia’s sales are expected to approximate 1.2 billion pounds of copper and 1.7 million ounces of gold, with approximately 60 percent of PT Freeport Indonesia’s copper and gold production expected in the second half of 2010. PT Freeport Indonesia’s sales for the year 2009 totaled 1.4 billion pounds of copper and 2.5 million ounces of gold.

Unit Net Cash Costs. Unit net cash costs per pound of copper is a measure intended to provide investors with information about the cash-generating capacity of our mining operations expressed on a basis relating to the primary metal product for our respective operations. We use this measure for the same purpose and for monitoring operating performance by our mining operations. This information differs from measures of performance determined in accordance with U.S. GAAP and should not be considered in isolation or as a substitute for measures of performance determined in accordance with U.S. GAAP. This measure is presented by other mining companies, although our measure may not be comparable to similarly titled measures reported by other companies.

#### Gross Profit per Pound of Copper/per Ounce of Gold

The following table summarizes the unit net cash costs (credits) and gross profit per pound of copper and per ounce of gold at our Indonesia mining operations for the first quarters of 2010 and 2009. Refer to “Production Revenues and Production Costs” for an explanation of “by-product” and “co-product” methods and a reconciliation of unit net cash costs per pound to production and delivery costs applicable to sales reported in our consolidated financial statements.

|  | First-Quarter 2010 By-Product Method | Co-Product Method Copper | Gold | First-Quarter 2009 By-Product Method | Co-Product Method Copper | Gold |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Revenues, after adjustments shown below | $3.51 | $3.51 | $1,109.64 | $1.80 | $1.80 | $904.18 |
| Site production and delivery, before net noncash |  |  |  |  |  |  |
| and other costs shown below | 1.54 | 1.02 | 323.21 | 0.92 | 0.53 | 268.28 |
| Gold and silver credits | (1.79) | – | – | (1.34) | – | – |
| Treatment charges | 0.23 | 0.15 | 47.38 | 0.20 | 0.11 | 59.27 |
| Royalty on metals | 0.12 | 0.08 | 25.64 | 0.07 | 0.04 | 19.48 |
| Unit net cash costs (credits) | 0.10 | 1.25 | 396.23 | (0.15) | 0.68 | 347.03 |
| Depreciation and amortization | 0.21 | 0.14 | 44.87 | 0.18 | 0.10 | 51.27 |
| Noncash and other costs, net | 0.06 | 0.04 | 13.07 | 0.03 | 0.02 | 8.69 |
| Total unit costs | 0.37 | 1.43 | 454.17 | 0.06 | 0.80 | 406.99 |
| Revenue adjustments, primarily for pricing on |  |  |  |  |  |  |
| prior period open sales | (0.03) | (0.03) | 2.33 | 0.17 | 0.17 | 11.85 |
| PT Smelting intercompany profit | 0.04 | 0.03 | 8.55 | (0.01) | (0.01) | (5.46) |
| Gross profit per pound/ounce | $3.15 | $2.08 | $666.35 | $1.90 | $1.16 | $503.58 |
| Copper sales (millions of recoverable pounds) | 296 | 296 |  | 369 | 369 |  |
| Gold sales (thousands of recoverable ounces) |  |  | 458 |  |  | 521 |

Because of the fixed nature of a large portion of PT Freeport Indonesia’s costs, unit costs vary significantly from period to period depending on volumes of copper and gold sold during the period. Unit net cash costs (net of gold and silver credits) for PT Freeport Indonesia increased to $0.10 per pound of copper in first-quarter 2010, compared with a net credit $0.15 per pound in first-quarter 2009, primarily reflecting higher site production and delivery costs ($0.62 per pound) mostly associated with lower copper sales volumes, partly offset by higher gold credits ($0.45 per pound) as a result of higher gold sales prices.

Treatment charges vary with the volume of metals sold and the price of copper, and royalties vary with the volume of metals sold and the prices of copper and gold.

Because certain assets are depreciated on a straight-line basis, PT Freeport Indonesia’s unit depreciation rate varies with the level of copper production and sales.

Assuming achievement of current sales volume and cost estimates, and average gold prices of $1,100 per ounce for the remainder of 2010, we estimate that average unit net cash costs for PT Freeport Indonesia (net of gold and silver credits) would approximate $0.25 per pound of copper in 2010, compared with a net credit of $0.49 per pound in 2009. Each $50 per ounce change in gold prices during the remainder of 2010 would have an approximate $0.05 per pound impact on PT Freeport Indonesia’s 2010 unit net cash costs.

### Africa Mining

Africa mining includes the Tenke Fungurume (Tenke) copper and cobalt mining concessions in the Katanga province of the DRC. We own an effective 57.75 percent interest in Tenke and are the operator of the project. The Tenke mine includes open-pit mining, leaching and SX/EW operations. Copper production from the Tenke mine is sold as copper cathode. In addition to copper, the Tenke mine produces cobalt hydroxide.

Construction activities for the initial development project were completed during 2009. Initial copper production commenced in late March 2009, and targeted copper production rates were achieved in September 2009. The cobalt and sulphuric acid plants were commissioned in third-quarter 2009; start-up and quality issues continue to be addressed in the cobalt circuit and sustained target levels are expected to be reached during 2010. Based on the 10-year average of current design operations, Tenke expects to produce approximately 250 million pounds of copper and 18 million pounds of cobalt per year.

Operating and Development Activities. We continue to engage in drilling activities, exploration analyses and metallurgical testing to evaluate the potential of this highly prospective minerals district and expect Tenke’s reserves to increase significantly over time. These analyses are being incorporated in future plans to evaluate opportunities for expansion. We commenced a feasibility study in fourth-quarter 2009 to evaluate a second phase of the project, which would include optimizing the current plant and increasing capacity significantly. The feasibility study is expected to be completed by mid-year 2010.

We are continuing to work cooperatively with the DRC government to resolve the ongoing contract review, but cannot predict the timing or the outcome of this process. We believe that the contract is fair and equitable, complies with Congolese law and is enforceable without modifications. See “Risk Factors” contained in Part I, Item 1A of our Form 10-K for the year ended December 31, 2009, for further discussion of these matters.

We are currently negotiating the labor agreement covering all national Tenke Fungurume employees, which expires in May 2010.

Operating Data. Following is summary operating data for our Africa mining operations for the first quarter of 2010 (because initial production began in late March 2009 operating data for first-quarter 2009 was negligible):

| Copper (millions of recoverable pounds) |  |
| --- | ---: |
| Production | 64 |
| Sales | 66 |
| Average realized price per pound | $3.26 |
| Ore milled (metric tons per day) | 9,700 |
| Average copper ore grade (percent) | 3.70 |
| Copper recovery rate (percent) | 91.7 |

Tenke’s sales are expected to approximate 250 million pounds of copper and over 20 million pounds of cobalt for the year 2010, compared with 130 million pounds of copper and 3 million pounds of cobalt for 2009. Higher grades of cobalt in the initial years are expected to result in higher than average annual cobalt production volumes.

The high grades of copper and cobalt in the ore at the Tenke mine are expected to result in an attractive cost structure once the full operation reaches design capacity. Upon reaching design capacity in the copper and cobalt circuits and assuming average cobalt prices of $10 per pound, average unit net cash costs for Tenke are targeted to approximate $0.50 per pound of copper. Each $2 per pound change in the average price of cobalt would have an approximate $0.12 per pound impact on Tenke’s unit net cash costs. Costs in the initial operations have been higher as start-up issues are being addressed. We expect to incorporate Tenke in our consolidated unit net cash costs disclosure upon completion of ramp-up activities in the cobalt circuit, expected during 2010.

### Molybdenum

Our Molybdenum operation is an integrated producer of molybdenum, with mining, sulfide ore concentrating, roasting and processing facilities that produce high-purity, molybdenum-based chemicals, molybdenum metal powder and metallurgical products, which are sold to customers around the world, and includes the wholly owned Henderson molybdenum mine in Colorado and related conversion facilities. The Henderson underground mine produces high-purity, chemical-grade molybdenum concentrates, which are typically further processed into value-added molybdenum chemical products. The Molybdenum operation also includes the wholly owned Climax molybdenum mine in Colorado, which has been on care-and-maintenance status since 1995; a sales company that purchases and sells molybdenum from our Henderson mine and from our North and South America copper mines that produce molybdenum as a by-product; and related conversion facilities that, at times, roast and/or process material on a toll basis. Toll arrangements require the tolling customer to deliver appropriate molybdenum-bearing material to our facilities for processing into a product that is returned to the customer, who pays us for processing their material into the specified products.

Operating and Development Activities. Beginning in fourth-quarter 2008, molybdenum markets were significantly affected by the downturn in economic conditions, which required us to operate the Henderson molybdenum mine at reduced rates during 2009. As market conditions have improved, Henderson operated at greater than 80 percent capacity during first-quarter 2010 and is expected to operate at 90 percent capacity for the remainder of 2010. We will continue to review operating plans and adjust rates to reflect market conditions.

Additionally, in response to weak market conditions during late 2008, we suspended construction activities associated with the project to restart the Climax molybdenum mine. We have continued to advance the project to prepare for resumption of construction activities as market conditions improve. Once a decision is made to resume construction activities, the project could be completed within 18 months. The Climax mine would have an initial annual design capacity of 30 million pounds, with significant expansion options. Estimated remaining costs for the project approximate $500 million, including approximately $75 million in costs for water management, treatment and tailings facilities, most of which would be incurred after initial start up.

Operating Data. Following is summary operating data for the Molybdenum operations for the first quarters of 2010 and 2009:

| Molybdenum (millions of recoverable pounds) | First Quarter 2010 | 2009 |
| --- | ---: | ---: |
| Productiona | 9 | 7 |
| Sales, excluding purchasesb | 17 | 10 |
| Average realized price per pound | $15.09 | $11.52 |
| **Henderson molybdenum mine** |  |  |
| Ore milled (metric tons per day) | 23,200 | 15,200 |
| Average molybdenum ore grade (percent) | 0.23 | 0.25 |
| Molybdenum production (millions of recoverable pounds) | 9 | 7 |

a. Reflects production at the Henderson molybdenum mine.

b. Includes sales of molybdenum produced as a by-product at our North and South America copper mines.

Molybdenum sales volumes increased to 17 million pounds in first-quarter 2010, compared with 10 million pounds in first-quarter 2009, because of improved demand in the metallurgical and chemical sectors. Molybdenum sales volumes are expected to approximate 62 million pounds for the year 2010, of which 30 million pounds represents by-product production from our North and South America copper mines, compared with 58 million pounds in 2009, of which 27 million pounds represented by-product production from our North and South America copper mines.

Unit Net Cash Costs. Unit net cash costs per pound of molybdenum is a measure intended to provide investors with information about the cash-generating capacity of our mining operations expressed on a basis relating to the primary metal product for our respective operations. We use this measure for the same purpose and for monitoring operating performance by our mining operations. This information differs from measures of performance determined in accordance with U.S. GAAP and should not be considered in isolation or as a substitute for measures of performance determined in accordance with U.S. GAAP. This measure is presented by other mining companies, although our measure may not be comparable to similarly titled measures reported by other companies.

#### Gross Profit per Pound of Molybdenum

The following table summarizes the unit net cash costs and gross profit per pound of molybdenum at our Henderson molybdenum mine for the first quarters of 2010 and 2009. Refer to “Product Revenues and Production Costs” for a reconciliation of unit net cash costs per pound to production and delivery costs applicable to sales reported in our consolidated financial statements.

|  | First Quarter 2010 | 2009a |
| --- | ---: | ---: |
| Revenues, after adjustments | $14.66 | $11.64 |
| Site production and delivery, before net noncash |  |  |
| and other costs shown below | 4.48 | 5.60 |
| Treatment charges and other | 1.08 | 1.09 |
| Unit net cash costs | 5.56 | 6.69 |
| Depreciation, depletion and amortization | 0.84 | 0.93 |
| Noncash and other costs, net | 0.04 | 0.04 |
| Total unit costs | 6.44 | 7.66 |
| Gross profitb | $8.22 | $3.98 |
| Molybdenum sales (millions of recoverable pounds)c | 9 | 7 |

a. Revenues and costs were adjusted to include freight and downstream conversion costs in net cash costs; gross profit was not affected by these adjustments.

b. Gross profit reflects sales of Henderson products based on volumes produced at market-based pricing. On a consolidated basis, the Molybdenum segment includes profits on sales as they are made to third parties and realizations based on actual contract terms. As a result, the actual gross profit realized will differ from the amounts reported in this table.

c. Reflects molybdenum produced by the Henderson molybdenum mine.

Henderson’s unit net cash costs decreased to $5.56 per pound of molybdenum in first-quarter 2010, compared with $6.69 per pound of molybdenum in first-quarter 2009, primarily reflecting higher volumes. Assuming achievement of current 2010 sales estimates, we estimate that the 2010 average unit net cash costs for Henderson would approximate $6.25 per pound of molybdenum, compared with $6.52 per pound in 2009.

### Rod & Refining

The Rod & Refining operations consist of copper conversion facilities located in North America, including a refinery, three rod mills and a specialty copper products facility. These operations process copper produced at our North America copper mines and purchased copper into copper cathode, rod and custom copper shapes. At times these operations refine copper and produce copper rod and shapes for customers on a toll basis. Toll arrangements require the tolling customer to deliver appropriate copper-bearing material to our facilities for processing into a product that is returned to the customer, who pays us for processing their material into the specified products.

During April 2010, we successfully negotiated a new three-year labor contract with certain of our employees at Bayway, our specialty copper products facility in New Jersey.

### Atlantic Copper Smelting & Refining

Atlantic Copper, our wholly owned subsidiary located in Spain, smelts and refines copper concentrates and markets refined copper and precious metals in slimes. Our Indonesia mining operation sells copper concentrate and our South America mining operations sell copper concentrate and copper cathode to Atlantic Copper. Through downstream integration, we are assured placement of a significant portion of our concentrate production. During first-quarter 2010, Atlantic Copper purchased approximately 25 percent of its concentrate requirements from our Indonesia mining operation and approximately 18 percent from our South America mining operations.

Smelting and refining charges consist of a base rate and, in certain contracts, price participation based on copper prices. Treatment charges for smelting and refining copper concentrates represent a cost to our Indonesia and South America mining operations, and income to Atlantic Copper and PT Smelting. Thus, higher treatment and refining charges benefit our smelter operations at Atlantic Copper and adversely affect our mining operations in Indonesia and South America. Our North America copper mines are not significantly affected by changes in treatment and refining charges because these operations are fully integrated with our Miami smelter located in Arizona.

Atlantic Copper had an operating loss of $11 million in both first-quarter 2010 and first-quarter 2009.

We defer recognizing profits on sales from our Indonesia and South America mining operations to Atlantic Copper and on 25 percent of our Indonesia mining sales to PT Smelting until final sales to third parties occur. Changes in these net deferrals resulted in net reductions to net income attributable to FCX common stockholders totaling $20 million ($0.04 per share) in first-quarter 2010, compared with net reductions of $62 million ($0.15 per share) in first-quarter 2009. At March 31, 2010, our net deferred profits on our Indonesia and the South America mining operations’ inventories at Atlantic Copper and PT Smelting to be recognized in future periods’ net income after taxes and noncontrolling interests totaled $157 million. Quarterly variations in ore grades, the timing of intercompany shipments and changes in prices will result in variability in our net deferred profits and quarterly earnings.

### CAPITAL RESOURCES AND LIQUIDITY

Our operating cash flows vary with prices realized from copper, gold and molybdenum sales, our production levels, production costs, cash payments for income taxes and interest, other working capital changes and other factors. As a result of weak economic conditions, we revised our operating plans at the end of 2008 and in early 2009 to protect liquidity while preserving our large mineral resources and growth options for the longer term. However, strong operating performance and rising copper prices have enabled us to enhance our financial and liquidity position, allowing us to manage volatile conditions effectively, reduce debt and reinstate cash dividends to shareholders, while maintaining our future growth opportunities. In addition, we have announced initiatives to resume certain project development activities (refer to “Operations” for further discussion). We view the long-term outlook for our business positively, supported by limitations on supplies of copper and by the requirements for copper in the world’s economy, and will continue to adjust our operating strategy as market conditions change.

Based on current mine plans and subject to future copper, gold and molybdenum prices, we expect estimated operating cash flows for the year 2010 to be greater than our budgeted capital expenditures, expected debt payments, dividends, noncontrolling interest distributions and other cash requirements.

### Cash and Cash Equivalents

At March 31, 2010, we had consolidated cash and cash equivalents of $3.8 billion. The following table reflects the U.S. and international components of consolidated cash and cash equivalents at March 31, 2010, and December 31, 2009 (in billions):

|  | March 31, 2010 | December 31, 2009 |
| --- | ---: | ---: |
| Cash at domestic companiesa | $2.1 | $1.5 |
| Cash at international operations | 1.7 | 1.2 |
| Total consolidated cash and cash equivalents | 3.8 b | 2.7 |
| Less: Noncontrolling interests’ share | (0.6) | (0.3) |
| Cash, net of noncontrolling interests’ share | 3.2 | 2.4 |
| Less: Withholding taxes and other | (0.2) | (0.2) |
| Net cash available to FCX | $3.0 | $2.2 |

a. Includes cash at our parent company and North America operations.

b. After taking into account the April 1, 2010, redemption of our Senior Floating Rate Notes consolidated cash approximated $2.7 billion (refer to “Financing Activities” for further discussion).

### Operating Activities

Consolidated operating cash flows vary significantly with fluctuations in the market prices of copper, gold and molybdenum, sales volumes and other factors. We generated operating cash flows totaling $1.8 billion in first-quarter 2010, including $280 million from working capital sources. Net cash used for operating activities totaled $258 million in first-quarter 2009, net of $895 million used for working capital requirements (which included approximately $573 million related to settlement of final pricing with customers on 2008 provisionally priced copper sales). The increase in first-quarter 2010 operating cash flows, compared with first-quarter 2009, primarily reflects higher copper prices.

Refer to “Overview and Outlook” for further discussion of projected operating cash flows for the year 2010.

### Investing Activities

Capital expenditures, including capitalized interest, decreased to $231 million in first-quarter 2010, compared with $519 million in first-quarter 2009, primarily reflecting the effects of lower capital spending for the Tenke Fungurume development project, for which construction activities are complete.

Refer to “Overview and Outlook” for further discussion of projected capital expenditures for 2010.

### Financing Activities

Debt and Equity Transactions. Total debt approximated $6.1 billion at March 31, 2010, and $6.3 billion at December 31, 2009. During first-quarter 2010, we had open-market purchases of $269 million of our 8.25% Senior Notes and 8.375% Senior Notes at a cost of $293 million (refer to Note 6 for further discussion of these transactions).

On April 1, 2010, we redeemed all of our $1 billion of outstanding Senior Floating Rate Notes due 2015. In addition, during April 2010 and through May 6, 2010, we made open-market purchases of $51 million of our senior notes. In second-quarter 2010, we expect to record a $27 million loss on early extinguishment of debt primarily associated with the redemption of the Senior Floating Rate Notes. Refer to Note 10 for further discussion. After taking into account the April 1, 2010, redemption of our Senior Floating Rate Notes and open-market purchases of senior notes during April 2010 and through May 6, 2010, total debt approximated $5.0 billion, which is $2.3 billion (or 32 percent) lower than at the beginning of 2009, resulting in estimated annual interest savings of approximately $160 million. We have no significant debt maturities in the near term; however, we may consider opportunities to prepay debt in advance of scheduled maturities.

We have revolving credit facilities available through March 2012, which are composed of a (i) $1.0 billion revolving credit facility available to FCX and (ii) $0.5 billion revolving credit facility available to both FCX and PT Freeport Indonesia. At March 31, 2010, we had no borrowings and $40 million of letters of credit issued under the facilities, resulting in availability of approximately $1.5 billion ($960 million of which could be used for additional letters of credit). The revolving credit facilities contain restrictions on the amount available for dividend payments, purchases of our common stock and certain debt prepayments. However, these restrictions do not apply as long as availability under the revolvers plus domestic cash exceeds $750 million. At March 31, 2010, we had availability under the revolvers plus available domestic cash (as defined by the revolving credit facility) totaling approximately $3.9 billion.

In addition, the indenture governing certain of our senior notes contains restrictions on incurring debt, making restricted payments and selling assets. As a result of our current corporate credit rating and the ratings on our unsecured notes (investment grade), these covenants are currently suspended. However, to the extent the rating is downgraded below investment grade, the covenants would again become effective.

As of March 31, 2010, we had 431 million common shares outstanding. After conversion of our 6¾% Mandatory Convertible Preferred Stock on May 1, 2010, we have approximately 470 million common shares outstanding.

In February 2009, we completed a public offering of 26.8 million shares of our common stock at an average price of $28.00 per share, which generated gross proceeds of $750 million (net proceeds of $740 million after fees and expenses), which were used for general corporate purposes.

We have an open-market share purchase program for up to 30 million shares. There are 23.7 million shares remaining under this program, and the timing of future purchases of our common stock is dependent on many factors, including our operating results; cash flows and financial position; copper, gold and molybdenum prices; the price of our common shares; and general economic and market conditions.

Cash Dividends. The declaration and payment of dividends is at the discretion of our Board of Directors (the Board). The amount of our cash dividend on our common stock is dependent upon our financial results, cash requirements, future prospects and other factors deemed relevant by the Board. Because of the deterioration in copper and molybdenum prices and in general economic conditions, in December 2008, the Board suspended the cash dividend on our common stock; accordingly, there were no common dividends paid in first-quarter 2009. In October 2009, the Board reinstated an annual cash dividend on our common stock of $0.60 per share, and we paid common dividends of $66 million in first-quarter 2010. On March 25, 2010, the Board declared a quarterly dividend of $0.15 per share, which was paid on May 1, 2010, to common shareholders of record at the close of business on April 15, 2010. In April 2010, the Board authorized an increase in the annual cash dividend on common stock to $1.20 per share ($0.30 per share quarterly), with the first quarterly dividend expected to be paid on August 1, 2010. The Board will continue to review our financial policy on an ongoing basis.

Preferred stock dividends paid totaled $49 million in first-quarter 2010 representing dividends on our 6¾% Mandatory Convertible Preferred Stock, and $60 million in first-quarter 2009 representing dividends on our 5½% Convertible Perpetual Preferred Stock and 6¾% Mandatory Convertible Preferred Stock. In September 2009, we redeemed our 5½% Convertible Perpetual Preferred Stock in exchange for 17.9 million shares of our common stock. During first-quarter 2010 and April 2010, holders of our 6¾% Mandatory Convertible Preferred Stock elected to convert approximately 0.9 million preferred shares into 1.3 million shares of our common stock (refer to Notes 6 and 10), and on May 1, 2010, the remaining 28 million shares of our 6¾% Mandatory Convertible Preferred Stock automatically converted into approximately 38 million shares of our common stock (refer to Note 10 for further discussion). Holders of our 6¾% Mandatory Convertible Preferred Stock as of the April 15, 2010, record date received the final quarterly dividend of $1.6875 per share on May 1, 2010, unless the preferred shares were voluntarily converted into shares of our common stock prior to the May 1 ,2010, mandatory conversion date.

Cash dividends paid to noncontrolling interests totaled $75 million in first-quarter 2010, which reflected dividends paid to the noncontrolling interest owners of PT Freeport Indonesia and the South America mining operations. Cash dividends paid to noncontrolling interest were less than $1 million in first-quarter 2009.

### CONTRACTUAL OBLIGATIONS

There have been no material changes in our contractual obligations since year-end 2009. Refer to Item 7 in our report on Form 10-K for the year ended December 31, 2009, for further information regarding our contractual obligations.

### ENVIRONMENTAL AND RECLAMATION MATTERS

Our mining, exploration, production and historical operating activities are subject to stringent laws and regulations governing the protection of the environment. There have been no material changes to our environmental and reclamation obligations since year-end 2009. Refer to Note 14 in our report on Form 10-K for the year ended December 31, 2009, for further information regarding our environmental and reclamation obligations.

### NEW ACCOUNTING STANDARDS

We do not expect the impact of recently issued accounting standards to have a significant impact on our future financial statements and disclosures.

### PRODUCT REVENUES AND PRODUCTION COSTS

Unit net cash costs per pound of copper and molybdenum are measures intended to provide investors with information about the cash-generating capacity of our mining operations expressed on a basis relating to the primary metal product for the respective operations. We use this measure for the same purpose and for monitoring operating performance by our mining operations. This information differs from measures of performance determined in accordance with U.S. GAAP and should not be considered in isolation or as a substitute for measures of performance determined in accordance with U.S. GAAP. This measure is presented by other mining companies, although our measure may not be comparable to similarly titled measures reported by other companies.

We present gross profit per pound of copper using both a “by-product” method and a “co-product” method. We use the by-product method in our presentation of gross profit per pound of copper because (i) the majority of our revenues are copper revenues, (ii) we mine ore, which contains copper, gold, molybdenum and other metals, (iii) it is not possible to specifically assign all of our costs to revenues from the copper, gold, molybdenum and other metals we produce, (iv) it is the method used to compare mining operations in certain industry publications and (v) it is the method used by our management and the Board to monitor operations. In the co-product method presentation below, costs are allocated to the different products based on their relative revenue values, which will vary to the extent our metals sales volumes and realized prices change.

In both the by-product and the co-product method calculations, we show adjustments to copper revenues for prior period open sales as separate line items. Because the copper pricing adjustments do not result from current period sales, we have reflected these separately from revenues on current period sales. Noncash and other costs consist of items such as LCM inventory adjustments, stock-based compensation costs and/or unusual charges. They are removed from site production and delivery costs in the calculation of unit net cash costs. As discussed above, gold, molybdenum and other metal revenues at copper mines are reflected as credits against site production and delivery costs in the by-product method. Following are presentations under both the by-product and co-product methods together with reconciliations to amounts reported in our consolidated financial statements.

### North America Copper Mines Product Revenues and Production Costs

*(In millions)*

| Three Months Ended March 31, 2010 | By-Product Method | Co-Product Method Copper | Molybdenuma | Otherb | Total |
| --- | ---: | ---: | ---: | ---: | ---: |
| Revenues, excluding adjustments shown below | $965 | $965 | $77 | $12 | $1,054 |
| Site production and delivery, before net noncash |  |  |  |  |  |
| and other costs shown below | 381 | 349 | 41 | 5 | 395 |
| By-product creditsa | (75) | – | – | – | – |
| Treatment charges | 22 | 21 | – | 1 | 22 |
| Net cash costs | 328 | 370 | 41 | 6 | 417 |
| Depreciation, depletion and amortization | 78 | 74 | 4 | – | 78 |
| Noncash and other costs, net | 24 | 24 | – | – | 24 |
| Total costs | 430 | 468 | 45 | 6 | 519 |
| Revenue adjustments, primarily for hedging | (1) | (1) | – | – | (1) |
| Idle facility and other non-inventoriable costs | (18) | (18) | – | – | (18) |
| Gross profit | $516 | $478 | $32 | $6 | $516 |
| Reconciliation to Amounts Reported |  |  |  |  |  |
| (In millions) |  |  | Depreciation, |  |  |
|  |  | Production | Depletion and |  |  |
|  | Revenues | and Delivery | Amortization |  |  |
| Totals presented above | $1,054 | $395 | $78 |  |  |
| Net noncash and other costs per above | N/A | 24 | N/A |  |  |
| Treatment charges per above | N/A | 22 | N/A |  |  |
| Revenue adjustments, primarily for hedging per above | (1) | N/A | N/A |  |  |
| Eliminations and other | 1 | 23 | 4 |  |  |
| North America copper mines | 1,054 | 464 | 82 |  |  |
| South America mining | 1,069 | 376 | 61 |  |  |
| Indonesia mining | 1,459 | 475 | 63 |  |  |
| Africa mining | 249 | 110 | 30 |  |  |
| Molybdenum | 275 | 185 | 13 |  |  |
| Rod & Refining | 1,073 | 1,067 | 2 |  |  |
| Atlantic Copper Smelting & Refining | 633 | 628 | 10 |  |  |
| Corporate, other & eliminations | (1,449) | (1,387) | 10 |  |  |
| As reported in FCX’s consolidated financial statements | $4,363 | $1,918 | $271 |  |  |

a. Molybdenum by-product credits and revenues reflect volumes produced at market-based pricing and also include tolling revenues at Sierrita.

b. Includes gold and silver product revenues and production costs.

### North America Copper Mines Product Revenues and Production Costs (continued)

*(In millions)*

| Three Months Ended March 31, 2009 | By-Product Method | Co-Product Method Copper | Molybdenuma | Otherb | Total |
| --- | ---: | ---: | ---: | ---: | ---: |
| Revenues, excluding adjustments shown below | $480 | $480 | $59 | $6 | $545 |
| Site production and delivery, before net noncash |  |  |  |  |  |
| and other costs shown below | 396 | 378 | 26 | 2 | 406 |
| By-product creditsa | (55) | – | – | – | – |
| Treatment charges | 25 | 25 | – | – | 25 |
| Net cash costs | 366 | 403 | 26 | 2 | 431 |
| Depreciation, depletion and amortization | 71 | 69 | 1 | 1 | 71 |
| Noncash and other costs, net | 46 | 45 | 1 | – | 46 |
| Total costs | 483 | 517 | 28 | 3 | 548 |
| Revenue adjustments, primarily for hedging | 69 | 69 | – | – | 69 |
| Idle facility and other non-inventoriable costs | (38) | (38) | – | – | (38) |
| Gross profit (loss) | $28 | $(6) | $31 | $3 | $28 |
| Reconciliation to Amounts Reported |  |  |  |  |  |
| (In millions) |  |  | Depreciation, |  |  |
|  |  | Production | Depletion and |  |  |
|  | Revenues | and Delivery | Amortization |  |  |
| Totals presented above | $545 | $406 | $71 |  |  |
| Net noncash and other costs per above | N/A | 46 | N/A |  |  |
| Treatment charges per above | N/A | 25 | N/A |  |  |
| Revenue adjustments, primarily for hedging per above | 69 | N/A | N/A |  |  |
| Eliminations and other | 4 | 76 | 4 |  |  |
| North America copper mines | 618 | 553 | 75 |  |  |
| South America mining | 702 | 367 | 65 |  |  |
| Indonesia mining | 1,122 | 350 | 65 |  |  |
| Africa mining | – | 16 | 3 |  |  |
| Molybdenum | 146 | 138 c | 9 |  |  |
| Rod & Refining | 619 | 614 | 2 |  |  |
| Atlantic Copper Smelting & Refining | 292 | 293 | 8 |  |  |
| Corporate, other & eliminations | (897) | (750) | 5 |  |  |
| As reported in FCX’s consolidated financial statements | $2,602 | $1,581 c | $232 |  |  |

a. Molybdenum by-product credits and revenues reflect volumes produced at market-based pricing and also include tolling revenues at Sierrita.

b. Includes gold and silver product revenues and production costs.

c. Includes LCM molybdenum inventory adjustments totaling $19 million.

### South America Mining Product Revenues and Production Costs

*(In millions)*

| Three Months Ended March 31, 2010 | By-Product Method | Co-Product Method Copper | Other a | Total |
| --- | ---: | ---: | ---: | ---: |
| Revenues, excluding adjustments shown below | $1,061 | $1,061 | $56 | $1,117 |
| Site production and delivery, before net noncash |  |  |  |  |
| and other costs shown below | 367 | 348 | 23 | 371 |
| By-product credits | (51) | – | – | – |
| Treatment charges | 47 | 47 | – | 47 |
| Net cash costs | 363 | 395 | 23 | 418 |
| Depreciation, depletion and amortization | 60 | 58 | 3 | 61 |
| Noncash and other costs, net | 2 | 2 | – | 2 |
| Total costs | 425 | 455 | 26 | 481 |
| Revenue adjustments, primarily for pricing on prior |  |  |  |  |
| period open sales | (2) | (2) | – | (2) |
| Other non-inventoriable costs | (8) | (7) | (1) | (8) |
| Gross profit | $626 | $597 | $29 | $626 |
| Reconciliation to Amounts Reported |  |  |  |  |
| (In millions) |  |  | Depreciation, |  |
|  |  | Production | Depletion and |  |
|  | Revenues | and Delivery | Amortization |  |
| Totals presented above | $1,117 | $371 | $61 |  |
| Net noncash and other costs per above | N/A | 2 | N/A |  |
| Treatment charges per above | (47) | N/A | N/A |  |
| Revenue adjustments, primarily for pricing on prior |  |  |  |  |
| period open sales per above | (2) | N/A | N/A |  |
| Eliminations and other | 1 | 3 | – |  |
| South America mining | 1,069 | 376 | 61 |  |
| North America copper mines | 1,054 | 464 | 82 |  |
| Indonesia mining | 1,459 | 475 | 63 |  |
| Africa mining | 249 | 110 | 30 |  |
| Molybdenum | 275 | 185 | 13 |  |
| Rod & Refining | 1,073 | 1,067 | 2 |  |
| Atlantic Copper Smelting & Refining | 633 | 628 | 10 |  |
| Corporate, other & eliminations | (1,449) | (1,387) | 10 |  |
| As reported in FCX’s consolidated financial statements | $4,363 | $1,918 | $271 |  |

a. Includes molybdenum, gold and silver product revenues and production costs.

### South America Mining Product Revenues and Production Costs (continued)

*(In millions)*

| Three Months Ended March 31, 2009 | By-Product Method | Co-Product Method Copper | Other a | Total |
| --- | ---: | ---: | ---: | ---: |
| Revenues, excluding adjustments shown below | $617 | $617 | $44 | $661 |
| Site production and delivery, before net noncash |  |  |  |  |
| and other costs shown below | 352 | 323 | 34 | 357 |
| By-product credits | (39) | – | – | – |
| Treatment charges | 48 | 48 | – | 48 |
| Net cash costs | 361 | 371 | 34 | 405 |
| Depreciation, depletion and amortization | 65 | 62 | 3 | 65 |
| Noncash and other costs, net | 5 | 5 | – | 5 |
| Total costs | 431 | 438 | 37 | 475 |
| Revenue adjustments, primarily for pricing on prior |  |  |  |  |
| period open sales | 88 | 88 | – | 88 |
| Other non-inventoriable costs | (9) | (8) | (1) | (9) |
| Gross profit | $265 | $259 | $6 | $265 |
| Reconciliation to Amounts Reported |  |  |  |  |
| (In millions) |  |  | Depreciation, |  |
|  |  | Production | Depletion and |  |
|  | Revenues | and Delivery | Amortization |  |
| Totals presented above | $661 | $357 | $65 |  |
| Net noncash and other costs per above | N/A | 5 | N/A |  |
| Treatment charges per above | (48) | N/A | N/A |  |
| Revenue adjustments, primarily for pricing on prior |  |  |  |  |
| period open sales per above | 88 | N/A | N/A |  |
| Eliminations and other | 1 | 5 | – |  |
| South America mining | 702 | 367 | 65 |  |
| North America copper mines | 618 | 553 | 75 |  |
| Indonesia mining | 1,122 | 350 | 65 |  |
| Africa mining | – | 16 | 3 |  |
| Molybdenum | 146 | 138 b | 9 |  |
| Rod & Refining | 619 | 614 | 2 |  |
| Atlantic Copper Smelting & Refining | 292 | 293 | 8 |  |
| Corporate, other & eliminations | (897) | (750) | 5 |  |
| As reported in FCX’s consolidated financial statements | $2,602 | $1,581 b | $232 |  |

a. Includes molybdenum, gold and silver product revenues and production costs.

b. Includes LCM molybdenum inventory adjustments totaling $19 million.

### Indonesia Mining Product Revenues and Production Costs

*(In millions)*

| Three Months Ended March 31, 2010 | By-Product Method | Co-Product Method Copper | Gold | Silver | Total |
| --- | ---: | ---: | ---: | ---: | ---: |
| Revenues, after adjustments shown below | $1,039 | $1,039 | $509 | $21 | $1,569 |
| Site production and delivery, before net noncash |  |  |  |  |  |
| and other costs shown below | 456 | 302 | 148 | 6 | 456 |
| Gold and silver credits | (530) | – | – | – | – |
| Treatment charges | 67 | 44 | 21 | 2 | 67 |
| Royalty on metals | 36 | 24 | 12 | – | 36 |
| Net cash costs | 29 | 370 | 181 | 8 | 559 |
| Depreciation and amortization | 63 | 42 | 21 | – | 63 |
| Noncash and other costs, net | 19 | 13 | 6 | – | 19 |
| Total costs | 111 | 425 | 208 | 8 | 641 |
| Revenue adjustments, primarily for pricing on prior |  |  |  |  |  |
| period open sales | (7) | (7) | – | – | (7) |
| PT Smelting intercompany loss | 12 | 8 | 4 | – | 12 |
| Gross profit | $933 | $615 | $305 | $13 | $933 |
| Reconciliation to Amounts Reported |  |  |  |  |  |
| (In millions) |  |  | Depreciation, |  |  |
|  |  | Production | Depletion and |  |  |
|  | Revenues | and Delivery | Amortization |  |  |
| Totals presented above | $1,569 | $456 | $63 |  |  |
| Net noncash and other costs per above | N/A | 19 | N/A |  |  |
| Treatment charges per above | (67) | N/A | N/A |  |  |
| Royalty on metals per above | (36) | N/A | N/A |  |  |
| Revenue adjustments, primarily for pricing on prior |  |  |  |  |  |
| period open sales per above | (7) | N/A | N/A |  |  |
| Indonesia mining | 1,459 | 475 | 63 |  |  |
| North America copper mines | 1,054 | 464 | 82 |  |  |
| South America mining | 1,069 | 376 | 61 |  |  |
| Africa mining | 249 | 110 | 30 |  |  |
| Molybdenum | 275 | 185 | 13 |  |  |
| Rod & Refining | 1,073 | 1,067 | 2 |  |  |
| Atlantic Copper Smelting & Refining | 633 | 628 | 10 |  |  |
| Corporate, other & eliminations | (1,449) | (1,387) | 10 |  |  |
| As reported in FCX’s consolidated financial statements | $4,363 | $1,918 | $271 |  |  |

47

### Indonesia Mining Product Revenues and Production Costs (continued)

*(In millions)*

| Three Months Ended March 31, 2009 | By-Product Method | Co-Product Method Copper | Gold | Silver | Total |
| --- | ---: | ---: | ---: | ---: | ---: |
| Revenues, after adjustments shown below | $665 | $665 | $477 | $17 | $1,159 |
| Site production and delivery, before net noncash |  |  |  |  |  |
| and other costs shown below | 339 | 195 | 140 | 4 | 339 |
| Gold and silver credits | (494) | – | – | – | – |
| Treatment charges | 75 | 43 | 31 | 1 | 75 |
| Royalty on metals | 25 | 14 | 10 | 1 | 25 |
| Net cash (credits) costs | (55) | 252 | 181 | 6 | 439 |
| Depreciation and amortization | 65 | 37 | 27 | 1 | 65 |
| Noncash and other costs, net | 11 | 7 | 4 | – | 11 |
| Total costs | 21 | 296 | 212 | 7 | 515 |
| Revenue adjustments, primarily for pricing on prior |  |  |  |  |  |
| period open sales | 63 | 63 | – | – | 63 |
| PT Smelting intercompany loss | (7) | (4) | (3) | – | (7) |
| Gross profit | $700 | $428 | $262 | $10 | $700 |
| Reconciliation to Amounts Reported |  |  |  |  |  |
| (In millions) |  |  | Depreciation, |  |  |
|  |  | Production | Depletion and |  |  |
|  | Revenues | and Delivery | Amortization |  |  |
| Totals presented above | $1,159 | $339 | $65 |  |  |
| Net noncash and other costs per above | N/A | 11 | N/A |  |  |
| Treatment charges per above | (75) | N/A | N/A |  |  |
| Royalty on metals per above | (25) | N/A | N/A |  |  |
| Revenue adjustments, primarily for pricing on prior |  |  |  |  |  |
| period open sales per above | 63 | N/A | N/A |  |  |
| Indonesia mining | 1,122 | 350 | 65 |  |  |
| North America copper mines | 618 | 553 | 75 |  |  |
| South America mining | 702 | 367 | 65 |  |  |
| Africa mining | – | 16 | 3 |  |  |
| Molybdenum | 146 | 138 a | 9 |  |  |
| Rod & Refining | 619 | 614 | 2 |  |  |
| Atlantic Copper Smelting & Refining | 292 | 293 | 8 |  |  |
| Corporate, other & eliminations | (897) | (750) | 5 |  |  |
| As reported in FCX’s consolidated financial statements | $2,602 | $1,581 a | $232 |  |  |

a. Includes LCM molybdenum inventory adjustments totaling $19 million.

### Henderson Molybdenum Mine Product Revenues and Production Costs

*(In millions)*

|  | Three Months Ended March 31, 2010 | 2009a |  |
| --- | ---: | ---: | ---: |
| Revenues, after adjustments | $139 | $77 |  |
| Site production and delivery, before net noncash |  |  |  |
| and other costs shown below | 42 | 37 |  |
| Treatment charges and other | 10 | 7 |  |
| Net cash costs | 52 | 44 |  |
| Depreciation, depletion and amortization | 8 | 6 |  |
| Noncash and other costs, net | 1 | – |  |
| Total costs | 61 | 50 |  |
| Gross profitb | $78 | $27 |  |
| Reconciliation to Amounts Reported |  | Production | Depreciation, |
| (In millions) |  | and | Depletion and |
|  | Revenues | Delivery | Amortization |
| Three Months Ended March 31, 2010 |  |  |  |
| Totals presented above | $139 | $42 | $8 |
| Treatment charges and other per above | (10) | N/A | N/A |
| Net noncash and other costs per above | N/A | 1 | N/A |
| Henderson mine | 129 | 43 | 8 |
| Other molybdenum operations and eliminationsc | 146 | 142 | 5 |
| Molybdenum | 275 | 185 | 13 |
| North America copper mines | 1,054 | 464 | 82 |
| South America mining | 1,069 | 376 | 61 |
| Indonesia mining | 1,459 | 475 | 63 |
| Africa mining | 249 | 110 | 30 |
| Rod & Refining | 1,073 | 1,067 | 2 |
| Atlantic Copper Smelting & Refining | 633 | 628 | 10 |
| Corporate, other & eliminations | (1,449) | (1,387) | 10 |
| As reported in FCX’s consolidated financial statements | $4,363 | $1,918 | $271 |
| Three Months Ended March 31, 2009 |  |  |  |
| Totals presented above | $77 | $37 | $6 |
| Treatment charges and other per above | (7) | N/A | N/A |
| Net noncash and other costs per above | N/A | – | N/A |
| Henderson mine | 70 | 37 | 6 |
| Other molybdenum operations and eliminationsc | 76 | 101 d | 3 |
| Molybdenum | 146 | 138 | 9 |
| North America copper mines | 618 | 553 | 75 |
| South America mining | 702 | 367 | 65 |
| Indonesia mining | 1,122 | 350 | 65 |
| Africa mining | – | 16 | 3 |
| Rod & Refining | 619 | 614 | 2 |
| Atlantic Copper Smelting & Refining | 292 | 293 | 8 |
| Corporate, other & eliminations | (897) | (750) | 5 |
| As reported in FCX’s consolidated financial statements | $2,602 | $1,581 d | $232 |

a. Revenues and costs were adjusted to include freight and downstream conversion costs in net cash costs; gross profit was not affected by these adjustments.

**b.** Gross profit reflects sales of Henderson products based on volumes produced at market-based pricing. On a consolidated basis, the Molybdenum segment includes profits on sales as they are made to third parties and realizations based on actual contract terms. As a result, the actual gross profit realized will differ from the amounts reported in this table.

**c.** Primarily includes amounts associated with the molybdenum sales company, which includes sales of molybdenum produced as a by-product at our North and South America copper mines.

**d.** Includes LCM molybdenum inventory adjustments totaling $19 million.

### CAUTIONARY STATEMENT

Our discussion and analysis contains forward-looking statements in which we discuss our expectations regarding future performance. Forward-looking statements are all statements other than statements of historical facts, such as those statements regarding anticipated production volumes, sales volumes, unit net cash costs, ore grades, milling rates, commodity prices, development and other capital expenditures, mine production and development plans, environmental liabilities, potential future dividend payments, reserve estimates, projected exploration efforts and results, operating cash flows, the impact of copper, gold, molybdenum and cobalt price changes, the impact of deferred intercompany profits on earnings, liquidity, other financial commitments and tax rates. The words “anticipates,” “may,” “can,” “plans,” “believes,” “estimates,” “expects,” “projects,” “intends,” “likely,” “will,” “should,” “to be” and any similar expressions and/or statements that are not historical facts, in each case as they relate to us or our management, are intended to identify those assertions as forward-looking statements.

In making any of those statements, the person making them believes that the expectations are based on reasonable assumptions. We caution readers that those statements are not guarantees of future performance, and our actual results may differ materially from those anticipated, projected or assumed in the forward-looking statements. Important factors that can cause our actual results to differ materially from those anticipated in the forward-looking statements include commodity prices, mine sequencing, production rates, industry risks, regulatory changes, political risks, the potential effects of the recent violence in Indonesia, potential outcomes of the contract review process in the DRC, weather-related risks, labor relations, environmental risks, litigation results, currency translation risks and other factors described in more detail under the heading “Risk Factors” in our Form 10-K for the year ended December 31, 2009, filed with the SEC.

Accordingly, no assurances can be given that any of the events anticipated by the forward-looking statements will transpire or occur, or if any of them do so, what impact they will have on our results of operations or financial condition. We do not intend to update our forward-looking statements more frequently than quarterly, and undertake no obligation to update any forward-looking statements.

## Market risk

As filed, 664 characters.

There have been no material changes in our market risks during the three months ended March 31, 2010. For additional information on market risks, refer to “Disclosures About Market Risks” included in Part II, Item 7A of our annual report on Form 10-K for the year ended December 31, 2009. For projected sensitivities of our operating cash flow to changes in commodity prices, refer to “Overview and Outlook” in Part I, Item 2 of this quarterly report on Form 10-Q; for projected sensitivities of our provisionally priced copper sales to changes in commodity prices refer to “Consolidated Results – Revenues” in Part I, Item 2 of this quarterly report on Form 10-Q.

## Controls and procedures

As filed, 833 characters.

(a) Evaluation of disclosure controls and procedures. Our chief executive officer and chief financial officer, with the participation of management, have evaluated the effectiveness of our “disclosure controls and procedures” (as defined in Rules 13a-15(e) and 15(d)-15(e) under the Securities Exchange Act of 1934) as of the end of the period covered by this quarterly report on Form 10-Q. Based on their evaluation, they have concluded that our disclosure controls and procedures are effective as of the end of the period covered by this report.

(b) Changes in internal control. There has been no change in our internal control over financial reporting that occurred during the quarter ended March 31, 2010, that has materially affected, or is reasonably likely to materially affect, our internal control over financial reporting.

## Risk factors

As filed, 262 characters.

There have been no material changes to our risk factors during the three months ended March 31, 2010. For additional information on risk factors, refer to “Risk Factors” included in Part I, Item 1A of our report on Form 10-K for the year ended December 31, 2009.

Filed May 7, 2010.