# Freeport-Mcmoran Inc: Form 10-Q for the period ended Jun 30, 2013

- Company: [Freeport-Mcmoran Inc](/companies/fcx.md) (CIK 831259)
- Form: 10-Q
- Filed: 2013-08-09
- Accepted by EDGAR: Aug 8, 2013, 17:39 ET
- Period: 2013-06-30
- Accession: 0000831259-13-000057
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/831259/000083125913000057/fcxq21310-q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/831259/000083125913000057/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2013-06-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2013-04-01 to 2013-06-30 | $4.29bn | us-gaap:SalesRevenueNet |
| Revenue | 6 months, 2013-01-01 to 2013-06-30 | $8.87bn | us-gaap:SalesRevenueNet |
| Cost of revenue | 3 months, 2013-04-01 to 2013-06-30 | $3.38bn | us-gaap:CostOfGoodsSold |
| Cost of revenue | 6 months, 2013-01-01 to 2013-06-30 | $6.43bn | us-gaap:CostOfGoodsSold |
| Selling, general and administrative | 3 months, 2013-04-01 to 2013-06-30 | $186.0m | us-gaap:SellingGeneralAndAdministrativeExpense |
| Selling, general and administrative | 6 months, 2013-01-01 to 2013-06-30 | $299.0m | us-gaap:SellingGeneralAndAdministrativeExpense |
| Operating income | 3 months, 2013-04-01 to 2013-06-30 | $639.0m | us-gaap:OperatingIncomeLoss |
| Operating income | 6 months, 2013-01-01 to 2013-06-30 | $1.99bn | us-gaap:OperatingIncomeLoss |
| Income tax | 3 months, 2013-04-01 to 2013-06-30 | $40.0m | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 6 months, 2013-01-01 to 2013-06-30 | $468.0m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2013-04-01 to 2013-06-30 | $610.0m | us-gaap:ProfitLoss |
| Net income | 6 months, 2013-01-01 to 2013-06-30 | $1.43bn | us-gaap:ProfitLoss |
| Diluted EPS | 3 months, 2013-04-01 to 2013-06-30 | $0.49 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 6 months, 2013-01-01 to 2013-06-30 | $1.17 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2013-04-01 to 2013-06-30 | $0.49 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 6 months, 2013-01-01 to 2013-06-30 | $1.17 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2013-04-01 to 2013-06-30 | 984,000,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 6 months, 2013-01-01 to 2013-06-30 | 968,000,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 6 months, 2013-01-01 to 2013-06-30 | $1.86bn | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 3 months, 2013-04-01 to 2013-06-30 | $1.17bn | us-gaap:PaymentsToAcquireProductiveAssets |
| Capital expenditure | 6 months, 2013-01-01 to 2013-06-30 | $1.98bn | us-gaap:PaymentsToAcquireProductiveAssets |
| Dividends paid | 6 months, 2013-01-01 to 2013-06-30 | $595.0m | us-gaap:PaymentsOfDividendsCommonStock |
| Cash and equivalents | at 2013-06-30 | $3.29bn | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2013-06-30 | $10.58bn | us-gaap:AssetsCurrent |
| Total assets | at 2013-06-30 | $63.16bn | us-gaap:Assets |
| Current liabilities | at 2013-06-30 | $5.61bn | us-gaap:LiabilitiesCurrent |
| Total liabilities | at 2013-06-30 | $38.51bn | us-gaap:Liabilities |
| Long-term debt | at 2013-06-30 | $21.14bn | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2013-06-30 | $73.0m | us-gaap:DebtCurrent |
| Shareholders' equity | at 2013-06-30 | $19.88bn | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 189,387 characters.

*In Management’s Discussion and Analysis of Financial Condition and Results of Operations, “we,” “us” and “our” refer to Freeport-McMoRan Copper & Gold Inc. (FCX) and its consolidated subsidiaries. You should read this discussion in conjunction with our financial statements, the related Management’s Discussion and Analysis of Financial Condition and Results of Operations and the discussion of our Business and Properties in our annual report on Form 10-K for the year ended December 31, 2012, filed with the United States (U.S.) Securities and Exchange Commission (SEC). The results of operations reported and summarized below are not necessarily indicative of future operating results (refer to "Cautionary Statement" for further discussion). In particular, the financial results for the second quarter and first six months of 2013 include the results of Freeport-McMoRan Oil & Gas (FM O&G) only since June 1, 2013. References to “Notes” are Notes included in our Notes to Consolidated Financial Statements. Throughout Management's Discussion and Analysis of Financial Condition and Results of Operations all references to earnings or losses per share are on a diluted basis, unless otherwise noted.*

### OVERVIEW

During second-quarter 2013, we completed the acquisitions of Plains Exploration & Production Company (PXP) and McMoRan Exploration Co. (MMR). PXP per-share consideration was equivalent to 0.6531 shares of our common stock and $25.00 in cash, resulting in issuance of 91 million shares of FCX common stock and payment of $3.8 billion in cash (including $411 million for the special dividend paid to PXP stockholders on May 31, 2013). In the MMR acquisition, for each MMR share owned, MMR shareholders received $14.75 in cash ($1.7 billion in cash, net of our and PXP's existing interests in MMR) and 1.15 units of a royalty trust, which holds a five percent overriding royalty interest in future production from MMR's ultra-deep exploration prospects that existed as of December 5, 2012, the date of the merger agreement. Refer to Note 2 for further discussion of the oil and gas acquisitions, including a summary of the preliminary purchase price allocations.

With these acquisitions, we are a premier U.S.-based natural resource company with an industry leading global portfolio of mineral assets, significant oil and gas resources and a growing production profile. We are the world's largest publicly traded copper producer. Our portfolio of assets includes the Grasberg minerals district in Indonesia, one of the world's largest copper and gold deposits, significant mining operations in North and South America, the Tenke Fungurume (Tenke) minerals district in the Democratic Republic of Congo (DRC) and significant oil and natural gas assets in North America, including reserves in the Deepwater Gulf of Mexico (GOM), onshore and offshore California and in the Eagle Ford and Haynesville shale plays, and an industry leading position in the emerging shallow water, ultra-deep gas trend on the shelf of the GOM and onshore in South Louisiana.

Our results for the second quarter and first six months of 2013, compared with the 2012 periods, primarily reflected lower metal price realizations, and include the results of FM O&G beginning June 1, 2013. Refer to "Consolidated Results" for further discussion of our consolidated financial results for the three- and six-month periods ended June 30, 2013 and 2012.

On May 14, 2013, a tragic accident, which resulted in 28 fatalities and 10 injuries, occurred at PT Freeport Indonesia when the rock structure above an underground ceiling for a training facility collapsed in an unprecedented and unexpected event. While the accident occurred outside the area of mining operations, PT Freeport Indonesia temporarily suspended mining and processing activities at the Grasberg complex in respect for the deceased and injured workers and their families, to devote all available resources to the rescue and recovery efforts, and to conduct inspections of its facilities in coordination with Indonesian government authorities. Refer to "Operations - Indonesia Mining" for further discussion.

At June 30, 2013, we had $3.3 billion in consolidated cash and cash equivalents and $21.2 billion in total debt, including $10.5 billion of acquisition-related debt and $7.1 billion of debt assumed in connection with the acquisitions of PXP and MMR. Refer to Note 7 and "Capital Resources and Liquidity" for further discussion.

During second-quarter 2013, we took actions to reduce or defer capital expenditures and other costs, and initiated efforts to identify potential asset sales to reduce debt and maintain financial strength and flexibility in response to recent declines in metals prices. Refer to "Capital Resources and Liquidity" for further discussion.

At current copper and oil prices, we expect to produce significant operating cash flows, and to use our cash to invest in our development projects, reduce debt and return cash to shareholders through dividends on our common stock.

### OUTLOOK

We view the long-term outlook for our business positively, supported by limitations on supplies of copper and oil and by the requirements for copper and oil in the world’s economy. Our financial results vary as a result of fluctuations in market prices primarily for copper, gold, molybdenum and oil, as well as other factors. World market prices for these commodities have fluctuated historically and are affected by numerous factors beyond our control. Because we cannot control the price of our products, the key measures that management focuses on in operating our business are sales volumes, unit net cash costs for our mining operations, cash production costs per barrel of oil equivalent (BOE) for our oil and gas operations and operating cash flow. Discussion of the outlook for each of these measures follows.

*Sales Volumes.* Following are our projected consolidated sales volumes for the year 2013:

| Copper (billions of recoverable pounds): |  |  |
| --- | ---: | --- |
| North America copper mines | 1.5 |  |
| South America mining | 1.3 |  |
| Indonesia mining | 0.9 |  |
| Africa mining | 0.4 |  |
|  | 4.1 |  |
| Gold (millions of recoverable ounces): |  |  |
| Indonesia mining | 1.0 |  |
| North and South America mining | 0.1 |  |
|  | 1.1 |  |
| Molybdenum (millions of recoverable pounds)a | 92 |  |
| Oil Equivalents (million BOE, or MMBOE) | 35 | b |

a. Projected molybdenum sales include 50 million pounds produced at our molybdenum mines and 42 million pounds produced at our North and South America copper mines.

b. Reflects projected sales of oil and gas for the period June 1, 2013, to December 31, 2013.

Consolidated sales for third-quarter 2013 are expected to approximate 1.1 billion pounds of copper, 330 thousand ounces of gold, 22 million pounds of molybdenum and 15 MMBOE. Projected 2013 sales volumes of copper and gold are approximately 210 million pounds and 260 thousand ounces lower than the estimates provided in our quarterly report on Form 10-Q for the period ended March 31, 2013, primarily reflecting the impact of the temporary production suspension in second-quarter 2013, impacts of achieving a full ramp-up in underground production and the timing of accessing higher grade material in the Grasberg open pit at PT Freeport Indonesia. Projected sales volumes are dependent on a number of factors, including operational performance, the impact of weather conditions and other factors.

*Mining Unit Net Cash Costs.* Assuming average prices of $1,300 per ounce of gold and $10 per pound of molybdenum for the second half of 2013, and achievement of current sales volume and cost estimates, consolidated unit net cash costs (net of by-product credits) for our copper mining operations are expected to average $1.58 per pound of copper for 2013. Projected unit net cash costs for 2013 are higher than the estimates provided in our quarterly report on Form 10-Q for the period ended March 31, 2013, primarily because of the impact of lower copper and gold volumes from Indonesia. The impact of price changes for the second half of 2013 on consolidated unit net cash costs would approximate $0.01 per pound for each $50 per ounce change in the average price of gold and $0.01 per pound for each $2 per pound change in the average price of molybdenum. Quarterly unit net cash costs vary with fluctuations in sales volumes and average realized prices (primarily gold and molybdenum prices). Unit net cash costs are expected to decline during the second half of 2013 and in 2014 as we gain access to higher grade ore in Indonesia. Refer to “Consolidated Results – Production and Delivery Costs” for further discussion of consolidated production and delivery costs for our mining operations.

*Oil and Gas Cash Production Costs per BOE.* Based on current sales volume and cost estimates for the second half of 2013, cash production costs per BOE are expected to approximate $19 per BOE for the year 2013 (reflecting results beginning June 1, 2013). Refer to “Operations – Oil and Gas” for further discussion of oil and gas production and delivery costs.

*Operating Cash Flow.* Our operating cash flows vary with prices realized from copper, gold, molybdenum and oil sales, our sales volumes, production costs, income taxes and other working capital changes and other factors. Based on current sales volume and cost estimates and assuming average prices of $3.15 per pound of copper, $1,300 per ounce of gold, $10 per pound of molybdenum and $105 per barrel of Brent crude oil for the second half of 2013, consolidated operating cash flows are estimated to approximate $5.8 billion (net of $30 million in net working capital uses and changes in other tax payments) for the year 2013. Projected operating cash flows for the year 2013 also reflect estimated taxes of $1.3 billion, which includes a net income tax benefit of $183 million for acquisition related adjustments (refer to “Consolidated Results – Provision for Income Taxes” for further discussion of our projected consolidated effective annual tax rate for 2013). The impact of price changes for the second half of 2013 on operating cash flows would approximate $200 million for each $0.10 per pound change in the average price of copper, $30 million for each $50 per ounce change in the average price of gold, $55 million for each $2 per pound change in the average price of molybdenum and $55 million for each $5 per barrel increase in the price of Brent crude oil.

### MARKETS

Metals. World prices for copper, gold and molybdenum can fluctuate significantly. During the period from January 2003 through July 2013, the London Metal Exchange (LME) spot copper price varied from a low of $0.70 per pound in 2003 to a record high of $4.60 per pound in 2011, the London Bullion Market Association (London) PM gold price fluctuated from a low of $320 per ounce in 2003 to a record high of $1,895 per ounce in 2011, and the *Metals Week* Molybdenum Dealer Oxide weekly average price ranged from a low of $3.28 per pound in 2003 to a record high of $39.25 per pound in 2005. Copper, gold and molybdenum prices are affected by numerous factors beyond our control as described further in our “Risk Factors” contained in Part I, Item 1A of our annual report on Form 10-K for the year ended December 31, 2012, as updated by our subsequent SEC filings.

This graph presents LME spot copper prices and the combined reported stocks of copper at the LME, Commodity Exchange Inc. (COMEX), a division of the New York Mercantile Exchange (NYMEX), and the Shanghai Futures Exchange from January 2003 through July 2013. From 2006 through most of 2008, limited supplies, combined with growing demand from China and other emerging economies, resulted in high copper prices and low levels of inventories. In late 2008, slowing consumption, turmoil in the U.S. financial markets and concerns about the global economy led to a sharp decline in copper prices, which reached a low of $1.26 per pound in December 2008. Higher copper prices since that time are attributable to a combination of demand from developing economies and pro-growth monetary and fiscal policy decisions in Europe, China and the U.S. During second-quarter 2013, LME spot copper prices ranged from a low of $3.01 per pound to a high of $3.42 per pound, averaged $3.24 per pound, and closed at $3.06 per pound on June 30, 2013.

We believe the underlying long-term fundamentals of the copper business remain positive, supported by the significant role of copper in the global economy and a challenging supply environment. Future copper prices are expected to be volatile and are likely to be influenced by demand from China and emerging markets, economic activity in the U.S. and other industrialized countries, the timing of the development of new supplies of copper and production levels of mines and copper smelters. LME spot copper prices closed at $3.09 per pound on July 31, 2013.

This graph presents London PM gold prices from January 2003 through July 2013. During second-quarter 2013, gold prices ranged from a low of $1,192 per ounce to a high of $1,584 per ounce, averaged $1,415 per ounce and closed at $1,192 per ounce on June 30, 2013. Gold prices have been under significant pressure in 2013 as investor sentiment toward gold turned negative. Gold prices closed at $1,315 per ounce on July 31, 2013.

This graph presents the *Metals Week* Molybdenum Dealer Oxide weekly average prices from January 2003 through July 2013. During second-quarter 2013, the weekly average price of molybdenum ranged from a low of $10.38 per pound to a high of $11.20 per pound, averaged $10.87 per pound and was $10.38 on June 30, 2013. The *Metals Week* Molybdenum Dealer Oxide weekly average price was $9.21 per pound on July 31, 2013.

Energy. The market prices for crude oil and natural gas can fluctuate significantly. During the period from January 2003 through July 2013, the Brent crude oil price ranged from a low of $23.26 per barrel in 2003 to a high of $146.08 per barrel in 2008 and the NYMEX natural gas price fluctuated from a low of $1.91 per million British thermal units (MMBtu) in 2012 to a high of $15.38 per MMBtu in 2005. Crude oil and natural gas prices are affected by numerous factors beyond our control as described further in our “Risk Factors” contained in Part II, Item 1A.

This graph presents Brent crude oil prices and NYMEX natural gas contract prices from January 2003 through July 2013. Oil prices reached a record high of $146.08 per barrel in July 2008 as economic growth in emerging economies and the U.S. created high global demand for oil and lower inventories. By the end of 2008, financial turmoil in the U.S. contributed to a global economic slowdown and a decline in many commodity prices, including oil which reached a low of $36.61 in December 2008. Crude oil prices have rebounded since 2008, supported by a gradually improving global economy and demand outlook. Recently, prospects for increased North American oil supplies led by U.S. shale production and weaker global growth expectations have weighed on the markets. During second-quarter 2013, the Brent crude oil price ranged from a low of $97.69 per barrel to a high of $111.08 per barrel, averaged $103.36 per barrel and was $102.16 per barrel on June 30, 2013. The Brent crude oil price was $107.70 on July 31, 2013.

### CRITICAL ACCOUNTING POLICIES AND ESTIMATES

Management’s discussion and analysis of financial condition and results of operations are based on our consolidated financial statements, which have been prepared in conformity with generally accepted accounting principles (GAAP) in the U.S. The preparation of these statements requires that we make estimates and assumptions that affect the reported amounts of assets, liabilities, revenues and expenses. We base these estimates on historical experience and on assumptions that we consider reasonable under the circumstances; however, reported results could differ from those based on the current estimates under different assumptions or conditions. As a result of the acquisitions of PXP and MMR, the following provides updates to the critical accounting policies and estimates presented in our annual report on Form 10-K for the year ended December 31, 2012.

*Oil and Gas Reserves.* Proved oil and gas reserves are those quantities of oil and natural gas which, by analysis of geoscience and engineering data, can be estimated with reasonable certainty to be economically producible from a given date forward, from known reservoirs, and under existing economic conditions, operating methods, and government regulations. The term “reasonable certainty” means a high degree of confidence that the quantities of oil and natural gas actually recovered will equal or exceed the estimate. Engineering estimates of proved oil and natural gas reserves directly impact financial accounting estimates, including depreciation, depletion and amortization and the full cost ceiling limitation. Preliminary estimates of total proved reserves, which are determined using methods prescribed by the U.S. SEC, including the use of an average price calculated as the trailing twelve-month average of the first-day-of-the-month reference price as adjusted for location and quality differentials. Actual future prices and costs may be materially higher or lower than the average prices and costs as of the date of the estimate.

There are numerous uncertainties inherent in estimating quantities and values of proved reserves and in projecting future rates of production and the amount and timing of development expenditures, including many factors beyond our control. Future development and abandonment costs are determined annually for each of our properties based upon its geographic location, type of production structure, water depth, reservoir depth and characteristics, currently available procedures and consultations with engineering consultants. Because these costs typically extend many years into the future, estimating these future costs is difficult and requires management to make judgments that are subject to future revisions based upon numerous factors, including changing technology and the political and regulatory environment. Reserve engineering is a subjective process of estimating the recovery from underground accumulations of oil and gas that cannot be measured in an exact manner and the accuracy of any reserve estimate is a function of the quality of available data and of engineering and geological interpretation and judgment. Because all reserve estimates are subjective, the quantities of oil and gas that are ultimately recovered, production and operating costs, the amount and timing of future development expenditures and future oil and gas sales prices may all differ from those assumed in our estimates.

Changes to estimates of proved reserves could result in changes to the prospective depletion rate for our oil and gas operations, which could have a significant impact our results of operations. Based on our estimated proved reserves and our net oil and gas properties subject to amortization at June 30, 2013, a 10 percent increase in our costs subject to depletion would increase our depletion rate by approximately $3.37 per BOE and a 10 percent reduction to proved reserves would increase our depletion rate by approximately $3.75 per BOE. Changes in estimates of proved oil and gas reserves may also affect our assessment of the impairments of oil and gas properties and goodwill. We believe that if our aggregate estimated proved reserves were significantly revised, such a revision could have a material impact on our results of operations.

*Impairments of Oil and Gas Properties.* As discussed in Note 3, we follow the full cost method of accounting whereby all costs associated with oil and gas property acquisition, exploration and development activities are capitalized and amortized to expense under the unit-of-production method using estimates of proved oil and natural gas reserves. Additionally, at June 30, 2013, we had $11.4 billion of costs for unproved oil and gas properties, which are excluded from amortization. These costs will be transferred into the amortization base as the properties are evaluated and proved reserves are established or if impairment is determined. We assess our unproved properties at least annually, and if impairment is indicated, the amount of the impairment is added to the amortization base. Accordingly, an impairment of unproved properties does not immediately result in the recognition of a charge to the consolidated statements of income, but rather increases the costs subject to amortization. The transfer of costs into the amortization base involves a significant amount of judgment and may be subject to changes over time based on our drilling plans and results, geological and geophysical evaluations, the assignment of proved reserves, and other factors.

We review the carrying value of our oil and gas properties each quarter on a country-by-country basis in accordance with full cost accounting rules. In evaluating our oil and gas properties for impairment, estimates of future cash flows are used (refer to Note 3, for further discussion of the ceiling test calculation). Additionally, SEC rules require that we price our future oil and gas production at the twelve-month average of the first-day-of-the-month reference prices adjusted for location and quality differentials. Such prices are utilized except where different prices are fixed and determinable from applicable contracts for the remaining term of those contracts. The pricing in ceiling test impairment calculations required by full cost accounting may cause results that are not in line with market conditions that exist at the end of an accounting period. For example, in periods of increasing oil and gas prices, the use of a twelve-month average price in the ceiling test calculation may result in an impairment. Conversely, in times of declining prices, ceiling test calculations may not result in an impairment. At June 30, 2013, with respect to our U.S. oil and gas properties, our only cost center, the "ceiling" exceeded net capitalized costs by approximately 10 percent and we did not record an impairment.

Because the ceiling test used to evaluate impairment of our oil and gas properties requires us to make several estimates and assumptions that are subject to risk and uncertainty, changes in these estimates and assumptions could result in the impairment of our oil and gas properties. Events that could result in impairment of our oil and gas properties include, but are not limited to, decreases in future oil and natural gas prices, decreases in estimated proved oil and gas reserves and any event that might otherwise have a material adverse effect on our oil and gas production levels or costs. Any potential future impairment charge would not have an impact on our operating cash flows.

*Goodwill.* At June 30, 2013, the carrying value of goodwill related to our oil and gas acquisitions totaled $1.9 billion (refer to Note 3 for further discussion). The final valuation of assets acquired, liabilities assumed and noncontrolling interests is not complete and the carrying amounts initially assigned to the assets, liabilities and noncontrolling interests may change as the fair value analysis is completed. Any adjustments to the recorded values of the assets acquired, liabilities assumed and noncontrolling interests in the acquisitions of PXP and MMR could impact the amount of goodwill recorded. In accordance with accounting rules, goodwill resulting from a business combination is assigned to the acquiring entity's reporting units that are expected to benefit from the business combination. The reporting unit to which goodwill is allocated under full cost accounting is the associated full cost pool. As discussed in Note 3, our oil and gas operations currently have one cost center, the U.S; therefore, goodwill has been allocated to the oil and gas reporting unit.

Goodwill is required to be evaluated for impairment at least annually. We will review goodwill for impairment during the fourth quarter of each year, and between annual evaluations if events occur or circumstances change that may indicate that the fair value of the reporting unit is below its carrying amount.

Because cash flows used to assess recoverability of goodwill will require us to make several estimates and assumptions that are subject to risk and uncertainty, changes in these estimates and assumptions could result in the impairment of recorded goodwill. Additionally, because projected oil and gas prices represent a critical assumption used in evaluating goodwill for impairment, future decreases in oil and gas prices could result in impairment of goodwill. Other events that could indicate impairment of goodwill assigned to our U.S. oil and gas reporting unit include, but are not limited, a decrease in estimated oil and gas reserves, sales of oil and gas properties, a significant adverse change in the economic or business climate and any event that might otherwise have a material adverse affect on our oil and gas production volumes or future development costs. Furthermore, as our U.S. full cost pool represents a depleting asset, absent net increases in the fair value of the reporting unit, the amount of recorded goodwill could be impaired at a future date; any future goodwill impairment charge would not have an impact on our operating cash flows.

### CONSOLIDATED RESULTS

| Financial Data (in millions, except per share amounts) | Three Months Ended June 30, 2013a |  | 2012 | Six Months Ended June 30, 2013a |  | 2012 |  |
| --- | ---: | --- | ---: | ---: | --- | ---: | --- |
| Revenuesb,c | $4,288 |  | $4,475 | $8,871 |  | $9,080 |  |
| Operating incomeb | $639 | d | $1,311 | $1,994 | d | $3,045 |  |
| Net income attributable to FCX common stockholderse | $482 | d,f | $710 | $1,130 | d,f,g | $1,474 | g |
| Diluted net income per share attributable to FCX common stockholders | $0.49 | d,f | $0.74 | $1.17 | d,f,g | $1.55 | g |
| Diluted weighted-average common shares outstanding | 984 |  | 953 | 968 |  | 954 |  |
| Operating cash flowsh | $1,034 |  | $1,182 | $1,865 |  | $1,983 |  |
| Capital expenditures | $1,173 |  | $840 | $1,978 |  | $1,547 |  |
| **Mining Operating Data** |  |  |  |  |  |  |  |
| Copper (millions of recoverable pounds) |  |  |  |  |  |  |  |
| Production | 909 |  | 887 | 1,889 |  | 1,720 |  |
| Sales, excluding purchases | 951 |  | 927 | 1,905 |  | 1,754 |  |
| Average realized price per pound | $3.17 |  | $3.53 | $3.29 |  | $3.61 |  |
| Site production and delivery costs per poundi | $2.11 |  | $2.01 | $2.02 |  | $1.98 |  |
| Unit net cash costs per poundi | $1.85 |  | $1.49 | $1.71 |  | $1.38 |  |
| Gold (thousands of recoverable ounces) |  |  |  |  |  |  |  |
| Production | 151 |  | 251 | 386 |  | 503 |  |
| Sales, excluding purchases | 173 |  | 266 | 387 |  | 554 |  |
| Average realized price per ounce | $1,322 |  | $1,588 | $1,434 |  | $1,639 |  |
| Molybdenum (millions of recoverable pounds) |  |  |  |  |  |  |  |
| Production | 24 |  | 20 | 46 |  | 41 |  |
| Sales, excluding purchases | 23 |  | 20 | 48 |  | 41 |  |
| Average realized price per pound | $12.35 |  | $15.44 | $12.56 |  | $15.39 |  |
| **Oil and Gas Operating Data** |  |  |  |  |  |  |  |
| **Oil Equivalents** |  |  |  |  |  |  |  |
| Sales volumes: |  |  |  |  |  |  |  |
| MMBOE | 5.0 |  |  | 5.0 |  |  |  |
| MBOE per day | 169 |  |  | 169 |  |  |  |
| Cash operating margin per BOEj: |  |  |  |  |  |  |  |
| Realized revenues | $74.37 |  |  | $74.37 |  |  |  |
| Cash production costs | 16.58 |  |  | 16.58 |  |  |  |
| Cash operating margin | $57.79 |  |  | $57.79 |  |  |  |

a. Includes the results of FM O&G beginning June 1, 2013.

b. Refer to Note 13 for a summary of revenues and operating income by business segment, including the results of our recently acquired oil and gas operations.

c. Includes the impact of adjustments to provisionally priced concentrate and cathode sales recognized in prior periods. The 2013 periods also include the impact of adjustments to oil and gas derivative contracts assumed in connection with the acquisition of PXP. Refer to “Revenues” for further discussion.

d. Includes charges of $61 million ($46 million to net income attributable to FCX common stockholders or $0.05 per share) for second-quarter 2013 and $75 million ($57 million to net income attributable to FCX common stockholders or $0.06 per share) for the first six months of 2013 for transaction and related costs principally associated with the acquisitions of PXP and MMR.

e. We defer recognizing profits on intercompany sales until final sales to third parties occur. Refer to "Operations - Atlantic Copper Smelting & Refining" for a summary of net impacts from changes in these deferrals.

f. The second quarter and first six months of 2013 include gains associated with the acquisitions of PXP and MMR, including (i) $128 million to net income attributable to FCX common stockholders, $0.13 per share, primarily related to our preferred stock investment in and the subsequent acquisition of MMR, and (ii) $183 million to net income attributable to FCX common stockholders, $0.19 per share, associated with net reductions in our deferred tax liabilities and deferred tax asset valuation allowances.

g. Includes losses on early extinguishment of debt totaling $39 million to net income attributable to FCX common stockholders,$0.04 per share, for the first six months of 2013 related to the termination of the acquisition bridge loan facilities and $149 million to net income attributable to FCX common stockholders, $0.16 per share, for the first six months of 2012 associated with the redemption of our remaining 8.375% senior notes. Refer to Note 7 for further discussion.

h. Includes net working capital sources (uses) and changes in other tax payments of $235 million for second-quarter 2013, $(54) million for second-quarter 2012, $(195) million for the first six months of 2013 and $(774) million for the first six months of 2012.

i. Reflects per pound weighted-average production and delivery costs and unit net cash costs (net of by-product credits) for all copper mines, excluding net noncash and other costs. For reconciliations of the per pound unit costs by operating division to production and delivery costs applicable to sales reported in our consolidated financial statements, refer to “Operations – Unit Net Cash Costs” and to “Product Revenues and Production Costs.”

j. Cash operating margin reflects realized revenues less cash production costs for our oil and gas operations. Realized revenues exclude unrealized gains (losses) on derivative instruments and cash production costs exclude accretion and other costs. For reconciliations of realized revenues and cash production costs per BOE to revenues and production and delivery costs reported in our consolidated financial statements, refer to "Product Revenues and Production Costs."

### Revenues

Consolidated revenues totaled $4.3 billion in second-quarter 2013 and $8.9 billion for the first six months of 2013, compared with $4.5 billion in second-quarter 2012 and $9.1 billion for the first six months of 2012, and primarily included the sale of copper concentrates, copper cathodes, copper rod, gold, molybdenum, silver and cobalt hydroxide, and beginning June 1, 2013, oil, natural gas and natural gas liquids (NGLs). Following is a summary of changes in our consolidated revenues between periods (in millions):

|  | Three Months Ended June 30, | Six Months Ended June 30, |
| --- | ---: | ---: |
| Consolidated revenues - 2012 periods | $4,475 | $9,080 |
| Higher (lower) sales volumes from mining operations: |  |  |
| Copper | 85 | 548 |
| Gold | (148) | (274) |
| Molybdenum | 40 | 99 |
| (Lower) higher price realizations from mining operations: |  |  |
| Copper | (342) | (610) |
| Gold | (46) | (79) |
| Molybdenum | (71) | (135) |
| Unfavorable impact of net adjustments for prior period provisionally priced sales | (69) | (133) |
| Oil and gas revenues, including the impact of derivative instruments | 336 | 336 |
| Other, including intercompany eliminations | 28 | 39 |
| Consolidated revenues - 2013 periods | $4,288 | $8,871 |

#### Sales Volumes

Consolidated copper sales volumes increased to 951 million pounds in second-quarter 2013 and 1.9 billion pounds for the first six months of 2013, compared with 927 million pounds in second-quarter 2012 and 1.8 billion for the first six months of 2012, primarily reflecting increased sales from the Americas and Africa. The first six months of 2013 also reflected increased sales from Indonesia, primarily because of lower production rates as a result of the first-quarter 2012 work interruptions at PT Freeport Indonesia.

Consolidated gold sales volumes decreased to 173 thousand ounces in second-quarter 2013 and 387 thousand ounces for the first six months of 2013, compared with 266 thousand ounces in second-quarter 2012 and 554 thousand ounces for the first six months of 2012, primarily reflecting lower production from Indonesia as a result of the temporary suspension of operations in mid-May following a tragic accident.

Consolidated molybdenum sales volumes increased to 23 million pounds in second-quarter 2013 and 48 million pounds for the first six months of 2013, compared with 20 million pounds in second-quarter 2012 and 41 million pounds for the first six months of 2012, primarily reflecting stronger sales in the metallurgical and chemical sectors.

Consolidated sales from our recently acquired oil and gas operations consisted of 5.0 MMBOE during June 2013, including 3.4 million barrels (MMBbls) of crude oil, 7.7 billion cubic feet (Bcf) of natural gas and 0.3 MMBbls of NGLs.

Refer to “Operations” for further discussion of sales volumes at our operating divisions.

#### Price Realizations

Our consolidated revenues can vary significantly as a result of fluctuations in the market prices of copper, gold, molybdenum and crude oil. Following is a summary of our average realized prices for the second quarters and first six months of 2013 and 2012:

|  | Three Months Ended June 30, 2013 |  | 2012 | Six Months Ended June 30, 2013 |  | 2012 |
| --- | ---: | --- | ---: | ---: | --- | ---: |
| Copper (per pound)a | $3.17 |  | $3.53 | $3.29 |  | $3.61 |
| Gold (per ounce) | $1,322 |  | $1,588 | $1,434 |  | $1,639 |
| Molybdenum (per pound) | $12.35 |  | $15.44 | $12.56 |  | $15.39 |
| Oil (per barrel)a | $97.42 | b | $— | $97.42 | b | $— |

a. Average realized prices exclude unrealized gains (losses) on derivative instruments.

b. Represents our average realized price for the period beginning June 1, 2013.

#### Provisionally Priced Copper Sales

During the first six months of 2013, 45 percent of our mined copper was sold in concentrate, 29 percent as cathode and 26 percent as rod from our North America operations. Substantially all of our copper concentrate and cathode sales contracts provide final copper pricing in a specified future month (generally one to four months from the shipment date) based primarily on quoted LME monthly average spot copper prices. We receive market prices based on prices in the specified future period, which results in price fluctuations recorded through revenues until the date of settlement. We record revenues and invoice customers at the time of shipment based on then-current LME prices, which results in an embedded derivative on our provisionally priced concentrate and cathode sales that is adjusted to fair value through earnings each period, using the period-end forward prices, until final pricing on the date of settlement. To the extent final prices are higher or lower than what was recorded on a provisional basis, an increase or decrease to revenues is recorded each reporting period until the date of final pricing. Accordingly, in times of rising copper prices, our revenues benefit from adjustments to the final pricing of provisionally priced sales pursuant to contracts entered into in prior periods; in times of falling copper prices, the opposite occurs.

Following are the (unfavorable) favorable impacts of net adjustments to the prior periods' provisionally priced copper sales for the second quarters and first six months of 2013 and 2012 (in millions, except per share amounts):

|  | Three Months Ended June 30, 2013 | 2012 | Six Months Ended June 30, 2013 | 2012 |
| --- | ---: | ---: | ---: | ---: |
| Revenues | $(117) | $(75) | $(26) | $101 |
| Net income attributable to FCX common stockholders | $(55) | $(31) | $(12) | $43 |
| Net income per share attributable to FCX common stockholders | $(0.06) | $(0.03) | $(0.01) | $0.05 |

At June 30, 2013, we had provisionally priced copper sales at our copper mining operations, primarily South America and Indonesia, totaling 306 million pounds of copper (net of intercompany sales and noncontrolling interests) recorded at an average of $3.06 per pound, subject to final pricing over the next several months. We estimate that each $0.05 change in the price realized from the June 30, 2013, provisional price recorded would have a net impact on our 2013 consolidated revenues of approximately $21 million ($11 million to net income attributable to common stockholders). The LME spot copper price closed at $3.09 per pound on July 31, 2013.

#### Oil & Gas Derivative Instruments

Our oil and gas operations use various derivative instruments to manage our exposure to commodity price risk related to sales of oil and gas production. These instruments do not qualify for hedge accounting and mark-to-market price fluctuations are reflected in revenues each period. A variety of derivative instruments, including swaps, put and call options, and various combinations of these instruments are in place to protect certain levels of oil and gas cash flows through 2015.

Following are the unfavorable impacts of net adjustments to oil and gas derivative contracts during June 2013 (in millions, except per share amount):

|  |  |
| --- | ---: |
| Revenues | $(35) |
| Net income attributable to FCX common stockholders | $(27) |
| Net income per share attributable to FCX common stockholders | $(0.03) |

Refer to Note 9 and "Disclosure About Market Risks - Commodity Price Risk" for further discussion.

### Production and Delivery Costs

Consolidated production and delivery costs increased to $2.9 billion in second-quarter 2013 and $5.6 billion for the first six months of 2013, compared with $2.6 billion in second-quarter 2012 and $5.1 billion for the first six months of 2012. Excluding production and delivery costs associated with oil and gas operations ($89 million for June 2013), higher production and delivery costs for our mining operations primarily reflected higher production in Africa and North America. The first six months of 2013 also reflected higher production in Indonesia and higher costs in North and South America.

Consolidated unit site production and delivery costs (before net noncash and other costs) for our copper mining operations were $2.11 per pound of copper in second-quarter 2013, $2.02 for the first six months of 2013, $2.01 per pound of copper in second-quarter 2012 and $1.98 for the first six months of 2012. Higher consolidated unit site production and delivery costs in the 2013 periods primarily reflected higher mining rates in North America and higher costs in South America. The second-quarter 2013 was also impacted by lower copper sales volumes in Indonesia, and the higher mining rates and costs in the Americas for the first six months of 2013 were partly offset by higher copper sales volumes in Indonesia. Assuming achievement of current volume and cost estimates, consolidated unit site production and delivery costs are expected to average $1.94 per pound of copper for the year 2013. Refer to “Operations – Unit Net Cash Costs” for further discussion of unit net cash costs associated with our operating divisions, and to “Product Revenues and Production Costs” for reconciliations of per pound costs by operating division to production and delivery costs applicable to sales reported in our consolidated financial statements.

Our copper mining operations require significant energy, principally diesel, electricity, coal and natural gas. Energy costs approximated 21 percent of our consolidated copper production costs in 2012 and are expected to approximate 20 percent for the year 2013, including purchases of approximately 270 million gallons of diesel fuel; 7,400 gigawatt hours of electricity at our North America, South America and Africa copper mining operations (we generate all of our power at our Indonesia mining operation); 685 thousand metric tons of coal for our coal power plant in Indonesia; and 1 million MMBtu of natural gas at certain of our North America mines.

### Depreciation, Depletion and Amortization

Consolidated depreciation, depletion and amortization expense totaled $530 million in second-quarter 2013 and $859 million for the first six months of 2013 (which included $169 million for our oil and gas operations in June 2013) compared with, $291 million in second-quarter 2012 and $558 million for the first six months of 2012. Our mining depreciation will vary under the UOP method as a result of changes in sales volumes and the related UOP rates at our individual mines, which have increased because of asset additions. Higher depreciation, depletion and amortization for our mining operations primarily reflected higher production in Africa, North America and at our molybdenum operations, and asset additions in South America and Indonesia. The first six months of 2013 also reflects higher production from Indonesia.

### Selling, General and Administrative Expenses

Consolidated selling, general and administrative expenses increased to $186 million in second-quarter 2013 and $299 million for the first six months of 2013, compared with $97 million in second-quarter 2012 and $201 million for the first six months of 2012, primarily because of costs associated with the acquisitions of PXP and MMR. Refer to Note 2 for further discussion of these acquisitions.

### Mining Exploration and Research Expenses

Consolidated exploration and research expenses for our mining operations totaled $64 million in second-quarter 2013 and $116 million for the first six months of 2013, compared to $73 million in second-quarter 2012 and $135 million for the first six months of 2012. We are actively conducting exploration activities near our existing mines with a focus on opportunities to expand reserves that will support additional future production capacity in the large mineral districts where we currently operate. Exploration results indicate opportunities for what we believe could be significant future potential reserve additions in North and South America and in the Tenke minerals district. The drilling data in North America continues to indicate the potential for expanded sulfide production.

For the year 2013, exploration and research expenditures for our mining operations are expected to approximate $220 million, including $185 million for exploration. Mining exploration activities will continue to focus primarily on the potential for future reserve additions in our existing mineral districts. Projected exploration spending for 2013 is approximately 20 percent lower than the estimates provided in our quarterly report on Form 10-Q for the period ended March 31, 2013, as a result of ongoing efforts to reduce capital spending and other operating costs (refer to "Capital Resources and Liquidity" for further discussion).

As discussed in Note 3, exploration costs for our oil and gas operations are capitalized as oil and natural gas properties within property, plant, equipment and development costs on our consolidated balance sheets.

### Environmental Obligations and Shutdown Costs

Environmental obligation costs reflect net revisions to our long-term environmental obligations, which will vary from period to period because of changes to environmental laws and regulations, the settlement of environmental matters and/or circumstances affecting our operations that could result in significant changes in our estimates. Shutdown costs include care and maintenance costs and any litigation, remediation or related expenditures associated with closed facilities or operations. Net charges for environmental obligations and shutdown costs totaled $16 million in second-quarter 2013 and $31 million for the first six months of 2013, compared with $81 million in second-quarter 2012 and $91 million for the first six months of 2012. Refer to Note 8 and "Contingencies" for further discussion of environmental obligations and litigation matters associated with closed facilities or operations.

### Interest Expense, Net

Consolidated interest expense (excluding capitalized interest) increased to $167 million in second-quarter 2013 and $242 million for the first six months of 2013, compared with $55 million in second-quarter 2012 and $154 million for the first six months of 2012, primarily reflecting additional interest expense associated with acquisition related debt. Refer to Note 7 for further discussion.

Capitalized interest is primarily related to the level of expenditures for our development projects and average interest rates on our borrowings, and totaled $35 million in second-quarter 2013 and $53 million for the first six months of 2013, compared to $12 million in second-quarter 2012 and $48 million for the first six months of 2012. Refer to “Capital Resources and Liquidity - Investing Activities” for further discussion of current development projects.

### Losses on Early Extinguishment of Debt

Losses on early extinguishment of debt totaled $45 million for the first six months of 2013 related to the termination of the bridge loan facilities for the PXP and MMR acquisitions, and $168 million for the first six months of 2012 related to the redemption of our remaining outstanding 8.375% senior notes. Refer to Note 7 for further discussion.

### Gain on Investment in MMR

Gain on investment in MMR totaled $128 million in the second quarter and first six months of 2013 primarily related to the carrying value of our 2010 preferred investment in MMR and the subsequent acquisition of MMR.

### Provision for Income Taxes

Following is a summary of the approximate amounts in the calculation of our consolidated provision for income taxes for the 2013 and 2012 periods (in millions, except percentages):

|  | Six Months Ended June 30, 2013 Incomea | Effective Tax Rate |  | Income Tax Provision |  | Six Months Ended June 30, 2012 Incomea | Effective Tax Rate | Income Tax (Provision) Benefit |
| --- | ---: | ---: | --- | ---: | --- | ---: | ---: | ---: |
| U.S. | $578 | 28% |  | $(160) |  | $793 | 24% | $(193) |
| South America | 784 | 35% |  | (278) |  | 1,136 | 34% | (391) |
| Indonesia | 213 | 54% |  | (116) | b | 643 | 43% | (276) |
| Africa | 210 | 31% |  | (66) |  | 168 | 31% | (51) |
| Eliminations and other | 113 | N/A |  | (18) |  | 69 | N/A | 1 |
| Annualized rate adjustmentc | — | N/A |  | (13) |  | — | N/A | (3) |
|  | 1,898 | 34% | e | (651) |  | 2,809 | 33% | (913) |
| Acquisition related adjustmentsd | — | N/A |  | 183 |  | — | N/A | — |
| Consolidated FCX | $1,898 | 25% |  | $(468) |  | $2,809 | 33% | $(913) |

a. Represents income by geographic location before income taxes and equity in affiliated companies’ net earnings (losses).

b. Includes an $18 million charge in second-quarter 2013 to reflect increases in tax reserves related to prior periods.

c. In accordance with applicable accounting rules, we adjust our interim provision for income taxes equal to our estimated annualized tax rate.

d. Reflects net reductions in our deferred tax liabilities and deferred tax asset valuation allowances resulting from our oil and gas acquisitions.

e. Our consolidated effective income tax rate is a function of the combined effective tax rates for the jurisdictions in which we operate. Accordingly, variations in the relative proportions of jurisdictional income can result in fluctuations to our consolidated effective income tax rate. Assuming average prices of $3.15 per pound for copper, $1,300 per ounce for gold, $10 per pound for molybdenum and $105 per barrel of Brent crude oil for the second half of 2013 and achievement of current sales volume and cost estimates, we estimate our consolidated effective tax rate, excluding the impact of the acquisition related adjustments, for the year 2013 will approximate 34 percent.

### OPERATIONS

### North America Copper Mines

We operate seven copper mines in North America – Morenci, Bagdad, Safford, Sierrita and Miami in Arizona, and Chino and Tyrone in New Mexico. All of these mining operations are wholly owned, except for Morenci. We record our 85 percent joint venture interest in Morenci using the proportionate consolidation method.

The North America copper mines include open-pit mining, sulfide ore concentrating, leaching and solution extraction/electrowinning (SX/EW) operations. A majority of the copper produced at our North America copper mines is cast into copper rod by our Rod & Refining segment. The remainder of our North America copper sales is in the form of copper cathode or copper concentrate, a portion of which is shipped to Atlantic Copper (our wholly owned copper smelter). Molybdenum concentrate is also produced by certain of our North America copper mines (Sierrita, Bagdad, Morenci and Chino), which is sold to our molybdenum sales company at market-based pricing.

Operating and Development Activities. We have increased production from our North America copper mines and continue to evaluate opportunities to invest in additional production capacity at our North America copper mines in response to positive exploration results in recent years. Future investments will be undertaken based on the results of economic and technical feasibility studies and taking into consideration market conditions.

*Morenci Mill Expansion.* We are expanding mining and milling capacity at Morenci to process additional sulfide ores identified through exploratory drilling. The project is targeting incremental annual production of approximately 225 million pounds of copper in 2014 (an approximate 40 percent increase from 2012) through an increase in milling rates from 50,000 metric tons of ore per day to approximately 115,000 metric tons of ore per day, and mining rates from 700,000 short tons per day to 900,000 short tons per day. The targeted increase in mining rates has been achieved and construction activities for the new mill and related facilities are in progress. At June 30, 2013, $629 million has been incurred for this project ($335 million during the first six months of 2013), with approximately $1.0 billion remaining to be incurred. Current cost estimates for the project are approximately 15 percent higher than previous estimates resulting from increased equipment and material costs and higher labor costs.

Operating Data. Following is summary operating data for the North America copper mines for the second quarters and first six months of 2013 and 2012:

| Operating Data, Net of Joint Venture Interest Copper (millions of recoverable pounds) | Three Months Ended June 30, 2013 | 2012 | Six Months Ended June 30, 2013 | 2012 |
| --- | ---: | ---: | ---: | ---: |
| Production | 349 | 331 | 692 | 668 |
| Sales, excluding purchases | 372 | 361 | 725 | 699 |
| Average realized price per pound | $3.25 | $3.57 | $3.41 | $3.68 |
| Molybdenum (millions of recoverable pounds) |  |  |  |  |
| Productiona | 9 | 9 | 17 | 19 |
| **100% Operating Data** |  |  |  |  |
| SX/EW operations |  |  |  |  |
| Leach ore placed in stockpiles (metric tons per day) | 1,053,000 | 948,600 | 1,026,700 | 990,800 |
| Average copper ore grade (percent) | 0.22 | 0.21 | 0.22 | 0.22 |
| Copper production (millions of recoverable pounds) | 226 | 210 | 435 | 428 |
| Mill operations |  |  |  |  |
| Ore milled (metric tons per day) | 240,900 | 228,300 | 245,700 | 232,200 |
| Average ore grade (percent): |  |  |  |  |
| Copper | 0.38 | 0.37 | 0.39 | 0.37 |
| Molybdenum | 0.03 | 0.03 | 0.03 | 0.03 |
| Copper recovery rate (percent) | 82.4 | 85.3 | 83.4 | 82.6 |
| Copper production (millions of recoverable pounds) | 148 | 144 | 306 | 286 |

a. Refer to "Consolidated Results" for our consolidated molybdenum sales volumes, which includes sales of molybdenum produced at the North America copper mines.

Copper sales volumes from our North America copper mines of 372 million pounds in second-quarter 2013 and 725 million pounds for the first six months of 2013, compared to 361 million pounds in second-quarter 2012 and 699 million pounds for the first six months of 2012, primarily reflecting increased production at the Chino mine.

For the year 2013, copper sales volumes from our North America copper mines are expected to approximate 1.5 billion pounds, compared with 1.35 billion pounds in 2012, primarily reflecting higher production at Morenci and Chino. Refer to "Outlook" for projected molybdenum sales volumes.

Unit Net Cash Costs. Unit net cash costs per pound of copper is a measure intended to provide investors with information about the cash-generating capacity of our mining operations expressed on a basis relating to the primary metal product for our respective operations. We use this measure for the same purpose and for monitoring operating performance by our mining operations. This information differs from measures of performance determined in accordance with U.S. GAAP and should not be considered in isolation or as a substitute for measures of performance determined in accordance with U.S. GAAP. This measure is presented by other metals mining companies, although our measure may not be comparable to similarly titled measures reported by other companies.

#### Gross Profit per Pound of Copper and Molybdenum

The following tables summarize unit net cash costs and gross profit per pound at our North America copper mines for the second quarters and first six months of 2013 and 2012. Refer to “Product Revenues and Production Costs” for an explanation of the “by-product” and “co-product” methods and a reconciliation of unit net cash costs per pound to production and delivery costs applicable to sales reported in our consolidated financial statements.

|  | Three Months Ended June 30, 2013 By- Product Method Copper | Co-Product Method Molyb- denum |  | Copper | Three Months Ended June 30, 2012 By- Product Method Molyb- denum | Co-Product Method |  |  |
| --- | ---: | ---: | ---: | --- | ---: | ---: | ---: | --- |
| Revenues, excluding adjustments | $3.25 | $3.25 | $11.17 | a | $3.57 | $3.57 | $13.53 | a |
| Site production and delivery, before net noncash and other costs shown below | 2.09 | 2.01 | 4.63 |  | 1.88 | 1.71 | 7.00 |  |
| By-product credits | (0.25) | — | — |  | (0.36) | — | — |  |
| Treatment charges | 0.08 | 0.08 | — |  | 0.10 | 0.10 | — |  |
| Unit net cash costs | 1.92 | 2.09 | 4.63 |  | 1.62 | 1.81 | 7.00 |  |
| Depreciation, depletion and amortization | 0.28 | 0.27 | 0.30 |  | 0.25 | 0.23 | 0.57 |  |
| Noncash and other costs, net | 0.08 | 0.08 | 0.04 |  | 0.11 | 0.10 | 0.07 |  |
| Total unit costs | 2.28 | 2.44 | 4.97 |  | 1.98 | 2.14 | 7.64 |  |
| Revenue adjustments, primarily for pricing on prior period open sales | (0.04) | (0.04) | — |  | (0.02) | (0.02) | — |  |
| Gross profit per pound | $0.93 | $0.77 | $6.20 |  | $1.57 | $1.41 | $5.89 |  |
| Copper sales (millions of recoverable pounds) | 370 | 370 |  |  | 360 | 360 |  |  |
| Molybdenum sales (millions of recoverable pounds)a |  |  | 9 |  |  |  | 9 |  |

|  | Six Months Ended June 30, 2013 By- Product Method Copper | Co-Product Method Molyb- denum | Copper |  | Six Months Ended June 30, 2012 By- Product Method Molyb- denum | Co-Product Method |  |  |
| --- | ---: | ---: | ---: | --- | ---: | ---: | ---: | --- |
| Revenues, excluding adjustments | $3.41 | $3.41 | $11.45 | a | $3.68 | $3.68 | $13.83 | a |
| Site production and delivery, before net noncash and other costs shown below | 2.04 | 1.98 | 3.98 |  | 1.84 | 1.72 | 4.92 |  |
| By-product credits | (0.26) | — | — |  | (0.39) | — | — |  |
| Treatment charges | 0.11 | 0.10 | — |  | 0.12 | 0.11 | — |  |
| Unit net cash costs | 1.89 | 2.08 | 3.98 |  | 1.57 | 1.83 | 4.92 |  |
| Depreciation, depletion and amortization | 0.28 | 0.27 | 0.26 |  | 0.26 | 0.24 | 0.37 |  |
| Noncash and other costs, net | 0.08 | 0.08 | 0.04 |  | 0.08 | 0.08 | 0.04 |  |
| Total unit costs | 2.25 | 2.43 | 4.28 |  | 1.91 | 2.15 | 5.33 |  |
| Revenue adjustments, primarily for pricing on prior period open sales | (0.01) | (0.01) | — |  | 0.01 | 0.01 | — |  |
| Gross profit per pound | $1.15 | $0.97 | $7.17 |  | $1.78 | $1.54 | $8.50 |  |
| Copper sales (millions of recoverable pounds) | 722 | 722 |  |  | 697 | 697 |  |  |
| Molybdenum sales (millions of recoverable pounds)a |  |  | 17 |  |  |  | 19 |  |

a. Reflects sales of molybdenum produced by certain of the North America copper mines to our molybdenum sales company at market-based pricing.

Our North America copper mines have varying cost structures because of differences in ore grades and characteristics, processing costs, by-product credits and other factors. As anticipated, average unit net cash costs (net of by-product credits) of $1.92 per pound of copper in second-quarter 2013 and $1.89 per pound for the first six months of 2013, were higher than unit net cash costs of $1.62 per pound in second-quarter 2012 and $1.57 per pound for the first six months of 2012, primarily reflecting higher mining rates and lower molybdenum credits.

Because certain assets are depreciated on a straight-line basis, North America's average unit depreciation rate may vary with asset additions and the level of copper production and sales.

Assuming achievement of current sales volume and cost estimates and an average price of $10 per pound of molybdenum for the second half of 2013, we estimate that average unit net cash costs (net of by-product credits) for our North America copper mines would approximate $1.87 per pound of copper for the year 2013, compared with $1.67 per pound in 2012. North America's projected average unit net cash costs would change by approximately $0.015 per pound for each $2 per pound change in the average price of molybdenum during the second half of 2013.

### South America Mining

We operate four copper mines in South America – Cerro Verde in Peru, and El Abra, Candelaria and Ojos del Salado in Chile. We own a 53.56 percent interest in Cerro Verde, a 51 percent interest in El Abra, and an 80 percent interest in both Candelaria and Ojos del Salado. All operations in South America are consolidated in our financial statements.

South America mining includes open-pit and underground mining, sulfide ore concentrating, leaching and SX/EW operations. Production from our South America mines is sold as copper concentrate or copper cathode under long-term contracts. Our South America mines ship a portion of their copper concentrate inventories to Atlantic Copper (our wholly owned copper smelter). In addition to copper, the Candelaria and Ojos del Salado mines produce gold and silver, and the Cerro Verde mine produces molybdenum concentrates which are sold to our molybdenum sales company at market-based pricing.

#### Operating and Development Activities.

*Cerro Verde Expansion.* We have commenced initial construction activities associated with a large-scale expansion at Cerro Verde. The project will expand the concentrator facilities from 120,000 metric tons of ore per day to 360,000 metric tons of ore per day and provide incremental annual production of approximately 600 million pounds of copper and 15 million pounds of molybdenum beginning in 2016. Considering the long-term nature and large size of the project, actual costs could vary from these estimates. At June 30, 2013, $849 million has been incurred for this project ($358 million during the first six months of 2013), with approximately $3.6 billion remaining to be incurred.

An agreement has been reached with the Regional Government of Arequipa, the National Government, Servicio de Agua Potable y Alcantarillado de Arequipa S.A. (SEDAPAR) and other local institutions to allow Cerro Verde to finance the engineering and construction of a wastewater treatment plant for Arequipa. Once Cerro Verde obtains a license for the treated water it would be used to supplement existing water supplies to support the concentrator expansion.

*El Abra Sulfide.* We continue to evaluate a potential large-scale milling operation at El Abra to process additional sulfide material and to achieve higher recoveries. Exploration results at El Abra have identified a significant sulfide resource. Future long-term investments will require evaluation and the completion of feasibility studies and will be dependent on overall market conditions.

Operating Data. Following is summary operating data for our South America mining operations for the second quarters and first six months of 2013 and 2012:

| Copper (millions of recoverable pounds) | Three Months Ended June 30, 2013 | 2012 | Six Months Ended June 30, 2013 | 2012 |
| --- | ---: | ---: | ---: | ---: |
| Production | 299 | 304 | 597 | 597 |
| Sales | 315 | 301 | 600 | 587 |
| Average realized price per pound | $3.13 | $3.51 | $3.22 | $3.56 |
| Gold (thousands of recoverable ounces) |  |  |  |  |
| Production | 19 | 18 | 40 | 37 |
| Sales | 21 | 16 | 42 | 35 |
| Average realized price per ounce | $1,317 | $1,596 | $1,449 | $1,630 |
| Molybdenum (millions of recoverable pounds) |  |  |  |  |
| Productiona | 2 | 2 | 4 | 4 |
| SX/EW operations |  |  |  |  |
| Leach ore placed in stockpiles (metric tons per day) | 279,100 | 242,700 | 271,000 | 219,500 |
| Average copper ore grade (percent) | 0.50 | 0.54 | 0.50 | 0.55 |
| Copper production (millions of recoverable pounds) | 110 | 113 | 219 | 231 |
| Mill operations |  |  |  |  |
| Ore milled (metric tons per day) | 194,600 | 192,600 | 191,600 | 189,300 |
| Average ore grade: |  |  |  |  |
| Copper (percent) | 0.56 | 0.58 | 0.57 | 0.57 |
| Gold (grams per metric ton) | 0.09 | 0.08 | 0.10 | 0.09 |
| Molybdenum (percent) | 0.02 | 0.02 | 0.02 | 0.02 |
| Copper recovery rate (percent) | 89.8 | 88.6 | 90.3 | 88.9 |
| Copper production (millions of recoverable pounds) | 189 | 191 | 378 | 366 |

a. Refer to "Consolidated Results" for our consolidated molybdenum sales volumes, which includes sales of molybdenum produced at Cerro Verde.

Consolidated copper sales volumes from South America increased to 315 million pounds in second-quarter 2013 and 600 million pounds for the first six months of 2013, compared to 301 million pounds in second-quarter 2012 and 587 million pounds for the first six months of 2012, primarily related to timing of shipments. The increase in the first six months of 2013 was partly offset by lower grade ore at Cerro Verde.

For the year 2013, consolidated sales volumes from South America mines are expected to approximate 1.3 billion pounds of copper compared with sales of 1.25 billion pounds of copper in 2012, primarily reflecting higher grade ore at Candelaria. Refer to "Outlook" for projected gold and molybdenum sales volumes.

Unit Net Cash Costs. Unit net cash costs per pound of copper is a measure intended to provide investors with information about the cash-generating capacity of our mining operations expressed on a basis relating to the primary metal product for our respective operations. We use this measure for the same purpose and for monitoring operating performance by our mining operations. This information differs from measures of performance determined in accordance with U.S. GAAP and should not be considered in isolation or as a substitute for measures of performance determined in accordance with U.S. GAAP. This measure is presented by other metals mining companies, although our measure may not be comparable to similarly titled measures reported by other companies.

#### Gross Profit per Pound of Copper

The following tables summarize unit net cash costs and gross profit per pound at the South America mining operations for the second quarters and first six months of 2013 and 2012. Unit net cash costs per pound of copper are reflected under the by-product and co-product methods as the South America mining operations also had small amounts of molybdenum, gold and silver sales. Refer to “Product Revenues and Production Costs” for an explanation of the “by-product” and “co-product” methods and a reconciliation of unit net cash costs per pound to production and delivery costs applicable to sales reported in our consolidated financial statements.

|  | Three Months Ended June 30, 2013 By-Product Method | Co-Product Method | Three Months Ended June 30, 2012 By-Product Method | Co-Product Method |
| --- | ---: | ---: | ---: | ---: |
| Revenues, excluding adjustments | $3.13 | $3.13 | $3.51 | $3.51 |
| Site production and delivery, before net noncash and other costs shown below | 1.62 | 1.50 | 1.56 | 1.45 |
| By-product credits | (0.24) | — | (0.23) | — |
| Treatment charges | 0.16 | 0.16 | 0.16 | 0.16 |
| Unit net cash costs | 1.54 | 1.66 | 1.49 | 1.61 |
| Depreciation, depletion and amortization | 0.27 | 0.25 | 0.24 | 0.23 |
| Noncash and other costs, net | 0.02 | (0.01) | 0.07 | 0.05 |
| Total unit costs | 1.83 | 1.90 | 1.80 | 1.89 |
| Revenue adjustments, primarily for pricing on prior period open sales | (0.21) | (0.21) | (0.22) | (0.22) |
| Gross profit per pound | $1.09 | $1.02 | $1.49 | $1.40 |
| Copper sales (millions of recoverable pounds) | 315 | 315 | 301 | 301 |

|  | Six Months Ended June 30, 2013 By-Product Method | Co-Product Method | Six Months Ended June 30, 2012 By-Product Method | Co-Product Method |
| --- | ---: | ---: | ---: | ---: |
| Revenues, excluding adjustments | $3.22 | $3.22 | $3.56 | $3.56 |
| Site production and delivery, before net noncash and other costs shown below | 1.62 | 1.50 | 1.55 | 1.43 |
| By-product credits | (0.26) | 0.16 | (0.26) | — |
| Treatment charges | 0.17 | — | 0.16 | 0.16 |
| Unit net cash costs | 1.53 | 1.66 | 1.45 | 1.59 |
| Depreciation, depletion and amortization | 0.26 | 0.25 | 0.22 | 0.22 |
| Noncash and other costs, net | 0.04 | 0.01 | 0.07 | 0.05 |
| Total unit costs | 1.83 | 1.92 | 1.74 | 1.86 |
| Revenue adjustments, primarily for pricing on prior period open sales | (0.05) | (0.05) | 0.18 | 0.18 |
| Gross profit per pound | $1.34 | $1.25 | $2.00 | $1.88 |
| Copper sales (millions of recoverable pounds) | 600 | 600 | 587 | 587 |

Our South America mines have varying cost structures because of differences in ore grades and characteristics, processing costs, by-product credits and other factors. Higher average unit net cash costs (net of by-product credits) of $1.54 per pound of copper in second-quarter 2013 and $1.53 per pound for the first six months of 2013, compared with $1.49 per pound in second-quarter 2012 and $1.45 per pound for the first six months of 2012, primarily reflected higher mining costs.

Because certain assets are depreciated on a straight-line basis, South America's unit depreciation rate may vary with asset additions and the level of copper production and sales.

Revenue adjustments primarily result from changes in prices on provisionally priced copper sales recognized in prior periods. Refer to “Consolidated Results - Revenues” for further discussion of adjustments to prior period provisionally priced copper sales.

Assuming achievement of current sales volume and cost estimates and average prices of $1,300 per ounce of gold and $10 per pound of molybdenum for the second half of 2013, we estimate that average unit net cash costs (net of by-product credits) for our South America mining operations would approximate $1.42 per pound of copper for the year 2013, compared with $1.50 per pound in 2012.

### Indonesia Mining

Indonesia mining includes PT Freeport Indonesia’s Grasberg minerals district. We own 90.64 percent of PT Freeport Indonesia, including 9.36 percent owned through our wholly owned subsidiary, PT Indocopper Investama. As previously reported in Note 14 of our annual report on Form 10-K for the year ended December 31, 2012, we have agreed to consider a potential sale of our interest in PT Freeport Indocopper Investama at fair market value. PT Freeport Indonesia is currently engaged in discussions with the Indonesian government related to its Contract of Work (COW) and intends to conclude that process before proceeding with a potential sale of an interest in PT Indocopper Investama.

PT Freeport Indonesia produces copper concentrates, which contain significant quantities of gold and silver. Substantially all of PT Freeport Indonesia’s copper concentrates are sold under long-term contracts, of which approximately one-half is sold to Atlantic Copper (our wholly owned copper smelter) and PT Smelting (PT Freeport Indonesia’s 25-percent owned copper smelter and refinery in Indonesia) and the remainder to other third-party customers.

We have established certain unincorporated joint ventures with Rio Tinto plc (Rio Tinto), under which Rio Tinto has a 40 percent interest in certain assets and future production exceeding specified annual amounts of copper, gold and silver. Refer to Note 2 in our annual report on Form 10-K for the year ended December 31, 2012, for discussion of our joint ventures with Rio Tinto.

PT Freeport Indonesia has commenced discussions with union officials regarding its bi-annual labor agreement which is scheduled for renewal in September 2013. For additional discussion of risks associated with our operations in Indonesia, including labor matters, refer to “Risk Factors” contained in Part I, Item 1A. of our annual report on Form 10-K for the year ended December 31, 2012.

Operating and Development Activities. We have several projects in progress in the Grasberg minerals district, primarily related to the development of the large-scale, high-grade underground ore bodies. In aggregate, these underground ore bodies are expected to ramp up over several years to produce approximately 240,000 metric tons of ore per day following the currently anticipated transition from the Grasberg open pit in 2017. Over the next five years, estimated aggregate capital spending on these projects is currently expected to average $760 million per year ($600 million per year net to PT Freeport Indonesia). Considering the long-term nature and large size of these projects, actual costs could vary from these estimates.

The following provides additional information on the continued development of the Common Infrastructure project, the Grasberg Block Cave underground mine and development of the Deep Mill Level Zone (DMLZ) ore body that lies below the Deep Ore Zone (DOZ) underground mine.

*Common Infrastructure and Grasberg Block Cave.* In 2004, PT Freeport Indonesia commenced its Common Infrastructure project to provide access to its large undeveloped underground ore bodies located in the Grasberg minerals district through a tunnel system located approximately 400 meters deeper than its existing underground tunnel system. In addition to providing access to our underground ore bodies, the tunnel system will enable PT Freeport Indonesia to conduct future exploration in prospective areas associated with currently identified ore bodies. The tunnel system was completed to the Big Gossan terminal, and the Big Gossan mine was brought into production in fourth-quarter 2010. Development of the DMLZ and Grasberg Block Cave underground mines is advancing.

The Grasberg Block Cave underground mine accounts for more than 40 percent of our recoverable proven and probable reserves in Indonesia. Production at the Grasberg Block Cave mine is currently scheduled to commence in 2017, at the end of mining the Grasberg open pit (currently expected to occur at the end of 2016). Targeted production rates once the Grasberg Block Cave mining operation reaches full capacity are expected to approximate 160,000 metric tons of ore per day.

Aggregate mine development capital for the Grasberg Block Cave mine and associated Common Infrastructure is expected to approximate $4.4 billion (incurred between 2008 and 2021), with PT Freeport Indonesia’s share totaling approximately $4.1 billion. Aggregate project costs totaling $1.0 billion have been incurred through June 30, 2013 ($186 million during the first six months of 2013).

*DMLZ.* The DMLZ ore body lies below the DOZ mine at the 2,590-meter elevation and represents the downward continuation of mineralization in the Ertsberg East Skarn system and neighboring Ertsberg porphyry. We plan to mine the ore body using a block-cave method with production beginning in 2015. Targeted production rates once the DMLZ mining operation reaches full capacity are expected to approximate 80,000 metric tons of ore per day.

Drilling efforts continue to determine the extent of this ore body. Aggregate mine development capital costs for the DMLZ mine are expected to approximate $2.3 billion (incurred between 2009 to 2020), with PT Freeport Indonesia’s share totaling approximately $1.4 billion. Aggregate project costs totaling $652 million have been incurred through June 30, 2013 ($142 million during the first six months of 2013).

Operating Data. Following is summary operating data for our Indonesia mining operations for the second quarters and first six months of 2013 and 2012:

| Operating Data, Net of Joint Venture Interest Copper (millions of recoverable pounds) | Three Months Ended June 30, 2013 | 2012 | Six Months Ended June 30, 2013 | 2012 |
| --- | ---: | ---: | ---: | ---: |
| Production | 139 | 173 | 358 | 296 |
| Sales | 158 | 183 | 356 | 317 |
| Average realized price per pound | $3.08 | $3.49 | $3.20 | $3.56 |
| Gold (thousands of recoverable ounces) |  |  |  |  |
| Production | 131 | 230 | 343 | 459 |
| Sales | 151 | 247 | 342 | 513 |
| Average realized price per ounce | $1,321 | $1,587 | $1,431 | $1,639 |
| **100% Operating Data** |  |  |  |  |
| Ore milled (metric tons per day):a |  |  |  |  |
| Grasberg open pit | 81,800 | 132,800 | 109,500 | 106,600 |
| DOZ underground mineb | 31,100 | 45,400 | 44,900 | 39,300 |
| Big Gossan underground minec | 1,400 | 1,300 | 2,200 | 1,200 |
| Total | 114,300 | 179,500 | 156,600 | 147,100 |
| Average ore grades: |  |  |  |  |
| Copper (percent) | 0.73 | 0.57 | 0.69 | 0.59 |
| Gold (grams per metric ton) | 0.53 | 0.58 | 0.53 | 0.68 |
| Recovery rates (percent): |  |  |  |  |
| Copper | 89.0 | 88.9 | 88.7 | 89.2 |
| Gold | 75.4 | 76.2 | 73.1 | 79.0 |
| Production (recoverable): |  |  |  |  |
| Copper (millions of pounds) | 139 | 173 | 358 | 296 |
| Gold (thousands of ounces) | 131 | 230 | 343 | 459 |

a. Amounts represent the approximate average daily throughput processed at PT Freeport Indonesia’s mill facilities from each producing mine.

b. Production from the DOZ underground mine is expected to ramp up to the design rate of 80,000 metric tons of ore per day by mid-2014.

c. Production from the Big Gossan underground mine is expected to ramp up to 7,000 metric tons of ore per day by 2016.

Indonesia's copper sales volumes totaled 158 million pounds for second-quarter 2013, 356 million pounds for the first six months of 2013, 183 million pounds for second-quarter 2012 and 317 million pounds for the first six months of 2012. Indonesia's gold sales volumes totaled 151 thousand ounces for second-quarter 2013 and 342 thousand ounces for the first six months of 2013, compared with 247 thousand ounces for second-quarter 2012 and 513 thousand ounces for the first six months of 2012.

Copper and gold sales volumes for the 2013 periods reflect estimated production impacts of approximately 125 million pounds of copper and 125 thousand ounces of gold as a result of the temporary suspension of operations following the accident described below. Lower gold sales volumes for the 2013 periods also reflect mining in a lower grade section of the open pit. Additionally, copper and gold sales volumes for the first six months of 2012 were impacted by lower production rates as a result of the first-quarter 2012 work interruptions at PT Freeport Indonesia.

On May 14, 2013, a tragic accident, which resulted in 28 fatalities and 10 injuries, occurred at PT Freeport Indonesia when the rock structure above an underground ceiling for a training facility collapsed in an unprecedented and unexpected event. While the accident occurred outside the area of mining operations, PT Freeport Indonesia temporarily suspended mining and processing activities at the Grasberg complex in respect for the deceased and injured workers and their families, to devote all available resources to the rescue and recovery efforts, and to conduct inspections of its facilities in coordination with Indonesian government authorities.

Following approval from Indonesia's Department of Energy and Mineral Resources, PT Freeport Indonesia resumed open-pit mining and concentrating activities at its Grasberg operations on June 24, 2013, and resumed underground operations on July 9, 2013. PT Freeport Indonesia has conducted safety inspections throughout its operations, which focused on ground control installation and monitoring. PT Freeport Indonesia's mill rates currently average approximately 200,000 metric tons of ore per day. Productivity in the open-pit operations continues to improve and the DOZ mine is being ramped up. Current DOZ rates approximate 40,000 metric tons of ore per day and are expected to reach 80,000 metric tons of ore per day by mid-2014. For further discussion of the risks associated with underground mining, refer to "Risk Factors" contained in Part 1, Item 1A. of our annual report on Form 10-K for the year ended December 31, 2012, as updated by our subsequent filings with the SEC.

At the Grasberg mine, the sequencing in mining areas with varying ore grades causes fluctuations in the timing of ore production resulting in varying quarterly and annual sales of copper and gold. Consolidated sales volumes from our Indonesia mining operations are expected to approximate 0.9 billion pounds of copper and 1.0 million ounces of gold for 2013, compared with 0.7 billion pounds of copper and 0.9 million ounces of gold in 2012. Projected 2013 sales volumes of copper and gold are approximately 230 million pounds and 250 thousand ounces lower than the estimates provided in our quarterly report on Form 10-Q for the period ended March 31, 2013, primarily reflecting the impact of the temporary production suspension in second-quarter 2013, impacts of achieving a full ramp-up in underground production and the timing of accessing higher grade material in the open pit. Sales from Indonesia are expected to increase in 2014 through 2016 as PT Freeport Indonesia gains access to higher ore grades.

Unit Net Cash Costs. Unit net cash costs per pound of copper is a measure intended to provide investors with information about the cash-generating capacity of our mining operations expressed on a basis relating to the primary metal product for our respective operations. We use this measure for the same purpose and for monitoring operating performance by our mining operations. This information differs from measures of performance determined in accordance with U.S. GAAP and should not be considered in isolation or as a substitute for measures of performance determined in accordance with U.S. GAAP. This measure is presented by other metals mining companies, although our measure may not be comparable to similarly titled measures reported by other companies.

#### Gross Profit per Pound of Copper and per Ounce of Gold

The following tables summarize the unit net cash costs and gross profit per pound of copper and per ounce of gold at our Indonesia mining operations for the second quarters and first six months of 2013 and 2012. Refer to “Production Revenues and Production Costs” for an explanation of “by-product” and “co-product” methods and a reconciliation of unit net cash costs per pound to production and delivery costs applicable to sales reported in our consolidated financial statements.

|  | Three Months Ended June 30, 2013 By-Product Method Copper | Co-Product Method Gold | Copper | Three Months Ended June 30, 2012 By-Product Method Gold | Co-Product Method |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Revenues, excluding adjustments | $3.08 | $3.08 | $1,321 | $3.49 | $3.49 | $1,587 |
| Site production and delivery, before net noncash and other costs shown below | 3.55 | 2.49 | 1,066 | 3.23 | 1.97 | 898 |
| Gold and silver credits | (1.20) | — | — | (2.20) | — | — |
| Treatment charges | 0.23 | 0.16 | 69 | 0.21 | 0.13 | 58 |
| Royalty on metals | 0.13 | 0.09 | 39 | 0.13 | 0.08 | 37 |
| Unit net cash costs | 2.71 | 2.74 | 1,174 | 1.37 | 2.18 | 993 |
| Depreciation and amortization | 0.37 | 0.26 | 111 | 0.29 | 0.18 | 80 |
| Noncash and other costs, net | 0.22 | 0.15 | 67 | 0.03 | 0.02 | 8 |
| Total unit costs | 3.30 | 3.15 | 1,352 | 1.69 | 2.38 | 1,081 |
| Revenue adjustments, primarily for pricing on prior period open sales | (0.18) | (0.18) | (110) | (0.11) | (0.11) | (9) |
| PT Smelting intercompany profit | 0.21 | 0.14 | 62 | 0.05 | 0.03 | 13 |
| Gross (loss) profit per pound/ounce | $(0.19) | $(0.11) | $(79) | $1.74 | $1.03 | $510 |
| Copper sales (millions of recoverable pounds) | 158 | 158 |  | 183 | 183 |  |
| Gold sales (thousands of recoverable ounces) |  |  | 151 |  |  | 247 |

|  | Six Months Ended June 30, 2013 By-Product Method Copper | Co-Product Method Gold | Copper | Six Months Ended June 30, 2012 By-Product Method Gold | Co-Product Method |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Revenues, excluding adjustments | $3.20 | $3.20 | $1,431 | $3.56 | $3.56 | $1,639 |
| Site production and delivery, before net noncash and other costs shown below | 3.03 | 2.08 | 934 | 3.35 | 1.89 | 869 |
| Gold and silver credits | (1.44) | — | — | (2.75) | — | — |
| Treatment charges | 0.23 | 0.16 | 70 | 0.20 | 0.11 | 52 |
| Royalty on metals | 0.13 | 0.09 | 41 | 0.13 | 0.08 | 35 |
| Unit net cash costs | 1.95 | 2.33 | 1,045 | 0.93 | 2.08 | 956 |
| Depreciation and amortization | 0.32 | 0.22 | 98 | 0.31 | 0.18 | 81 |
| Noncash and other costs, net | 0.24 | 0.17 | 76 | 0.09 | 0.05 | 25 |
| Total unit costs | 2.51 | 2.72 | 1,219 | 1.33 | 2.31 | 1,062 |
| Revenue adjustments, primarily for pricing on prior period open sales | — | — | (4) | 0.04 | 0.04 | 5 |
| PT Smelting intercompany profit | 0.10 | 0.07 | 33 | (0.04) | (0.02) | (10) |
| Gross profit per pound/ounce | $0.79 | $0.55 | $241 | $2.23 | $1.27 | $572 |
| Copper sales (millions of recoverable pounds) | 356 | 356 |  | 317 | 317 |  |
| Gold sales (thousands of recoverable ounces) |  |  | 342 |  |  | 513 |

A significant portion of PT Freeport Indonesia's costs are fixed and unit costs vary depending on production volumes. Indonesia's unit net cash costs (net of gold and silver credits) increased to $2.71 per pound of copper in second-quarter 2013, compared with $1.37 per pound in second-quarter 2012, primarily reflecting the impact of the temporary production suspension in second-quarter 2013 and lower gold credits.

Average unit net cash costs at PT Freeport Indonesia averaged $1.95 per pound for the first six months of 2013, compared with $0.93 per pound for the first six months of 2012, primarily reflecting lower gold credits, partly offset by higher sales volumes.

Treatment charges vary with the volume of metals sold and the price of copper, and royalties vary with the volume of metals sold and the prices of copper and gold.

Because certain assets are depreciated on a straight-line basis, PT Freeport Indonesia’s unit depreciation rate

varies with the level of copper production and sales.

Revenue adjustments primarily result from changes in prices on provisionally priced copper sales recognized in prior periods. Refer to “Consolidated Results - Revenues” for further discussion of adjustments to prior period provisionally priced copper sales.

Assuming achievement of current sales volume and cost estimates, and an average gold price of $1,300 per ounce for the second half of 2013, we estimate that Indonesia's unit net cash costs (net of gold and silver credits) would approximate $1.51 per pound of copper for the year 2013, and would change by $0.04 per pound for each $50 per ounce change in the average price of gold for the second half of 2013. Because of the fixed nature of a large portion of Indonesia's costs, unit costs vary from quarter to quarter depending on copper and gold sales volumes. Indonesia's unit net cash costs are expected to decline during the second half of 2013 and in 2014 as it gains access to higher grade ore.

### Africa Mining

Africa mining includes Tenke Fugurume Mining S.A.R.L.'s (TFM) Tenke minerals district. We hold an effective 56 percent interest in the Tenke copper and cobalt mining concessions in the Katanga province of the DRC through our consolidated subsidiary TFM and are the operator of Tenke.

The Tenke operation includes surface mining, leaching and SX/EW operations. Copper production from the Tenke minerals district is sold as copper cathode. In addition to copper, the Tenke minerals district produces cobalt hydroxide.

For additional discussion of risks associated with our operations in Africa, refer to “Risk Factors” contained in Part I, Item 1A. of our annual report on Form 10-K for the year ended December 31, 2012, as updated by our subsequent filings with the SEC.

Operating and Development Activities. TFM has completed its second phase expansion project, which included optimizing the current plant and increasing mine, mill and processing capacity. The expanded mill is capable of throughput of 14,000 metric tons of ore per day to enable increasing copper production by 150 million pounds to over 430 million pounds per year. The expanded mill facility is performing well, with average throughput rates for the first six months of 2013 averaging 14,800 metric tons of ore per day. The addition of a second sulphuric acid plant is expected to be completed in 2015.

We continue to engage in drilling activities, exploration analyses and metallurgical testing to evaluate the potential of the highly prospective Tenke minerals district. These analyses are being incorporated in future plans to evaluate opportunities for expansion. Future expansions are subject to a number of factors, including economic and market conditions, and the business and investment climate in the DRC.

Operating Data. Following is summary operating data for our Africa mining operations for the second quarters and first six months of 2013 and 2012:

| Copper (millions of recoverable pounds) | Three Months Ended June 30, 2013 | 2012 | Six Months Ended June 30, 2013 | 2012 |
| --- | ---: | ---: | ---: | ---: |
| Production | 122 | 79 | 242 | 159 |
| Sales | 106 | 82 | 224 | 151 |
| Average realized price per pounda | $3.10 | $3.45 | $3.22 | $3.54 |
| Cobalt (millions of contained pounds) |  |  |  |  |
| Production | 5 | 6 | 11 | 12 |
| Sales | 5 | 6 | 11 | 11 |
| Average realized price per pound | $8.48 | $8.24 | $7.99 | $8.40 |
| Ore milled (metric tons per day) | 15,000 | 12,900 | 14,800 | 12,500 |
| Average ore grades (percent): |  |  |  |  |
| Copper | 4.59 | 3.45 | 4.52 | 3.53 |
| Cobalt | 0.31 | 0.36 | 0.32 | 0.37 |
| Copper recovery rate (percent) | 89.9 | 90.6 | 91.7 | 90.9 |

a. Includes point-of-sale transportation costs as negotiated in customer contracts.

Copper sales from Africa increased to 106 million pounds in second-quarter 2013 and 224 million pounds for the first six months of 2013, compared to 82 million pounds in second-quarter 2012 and 151 million pounds for the first six months of 2012, primarily reflecting higher mining and milling rates principally related to the ramp up of the expansion project and higher ore grades.

For the year 2013, we expect sales volumes from our Africa mining operations to approximate 450 million pounds of copper and 24 million pounds of cobalt, compared with 336 million pounds of copper and 25 million pounds of cobalt in 2012.

Unit Net Cash Costs. Unit net cash costs per pound of copper is a measure intended to provide investors with information about the cash-generating capacity of our mining operations expressed on a basis relating to the primary metal product for our respective operations. We use this measure for the same purpose and for monitoring operating performance by our mining operations. This information differs from measures of performance determined in accordance with U.S. GAAP and should not be considered in isolation or as a substitute for measures of performance determined in accordance with U.S. GAAP. This measure is presented by other metals mining companies, although our measure may not be comparable to similarly titled measures reported by other companies.

#### Gross Profit per Pound of Copper and Cobalt

The following tables summarize the unit net cash costs and gross profit per pound of copper and cobalt at our Africa mining operations for the second quarters and first six months of 2013 and 2012. Refer to “Production Revenues and Production Costs” for an explanation of “by-product” and “co-product” methods and a reconciliation of unit net cash costs per pound to production and delivery costs applicable to sales reported in our consolidated financial statements.

|  | Three Months Ended June 30, 2013 By-Product Method Copper | Co-Product Method Cobalt |  | Three Months Ended June 30, 2012 By-Product Method Copper Cobalt | Co-Product Method |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Revenues, excluding adjustmentsa | $3.10 | $3.10 | $8.48 | $3.45 | $3.45 | $8.24 |
| Site production and delivery, before net noncash and other costs shown below | 1.47 | 1.37 | 4.92 | 1.48 | 1.39 | 5.09 |
| Cobalt creditsb | (0.30) | — | — | (0.33) | — | — |
| Royalty on metals | 0.06 | 0.05 | 0.15 | 0.07 | 0.06 | 0.13 |
| Unit net cash costs | 1.23 | 1.42 | 5.07 | 1.22 | 1.45 | 5.22 |
| Depreciation, depletion and amortization | 0.53 | 0.49 | 0.80 | 0.49 | 0.43 | 0.75 |
| Noncash and other costs, net | 0.11 | 0.10 | 0.17 | 0.09 | 0.08 | 0.14 |
| Total unit costs | 1.87 | 2.01 | 6.04 | 1.80 | 1.96 | 6.11 |
| Revenue adjustments, primarily for pricing on prior period open sales | (0.07) | (0.07) | 0.27 | (0.07) | (0.07) | 0.12 |
| Gross profit per pound | $1.16 | $1.02 | $2.71 | $1.58 | $1.42 | $2.25 |
| Copper sales (millions of recoverable pounds) | 106 | 106 |  | 82 | 82 |  |
| Cobalt sales (millions of contained pounds) |  |  | 5 |  |  | 6 |

|  | Six Months Ended June 30, 2013 By-Product Method Copper | Co-Product Method Cobalt |  | Six Months Ended June 30, 2012 By-Product Method Copper Cobalt | Co-Product Method |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Revenues, excluding adjustmentsa | $3.22 | $3.22 | $7.99 | $3.54 | $3.54 | $8.40 |
| Site production and delivery, before net noncash and other costs shown below | 1.43 | 1.35 | 4.54 | 1.49 | 1.41 | 5.11 |
| Cobalt creditsb | (0.26) | — | — | (0.34) | — | — |
| Royalty on metals | 0.06 | 0.06 | 0.14 | 0.08 | 0.07 | 0.13 |
| Unit net cash costs | 1.23 | 1.41 | 4.68 | 1.23 | 1.48 | 5.24 |
| Depreciation, depletion and amortization | 0.51 | 0.47 | 0.75 | 0.48 | 0.42 | 0.71 |
| Noncash and other costs, net | 0.08 | 0.07 | 0.11 | 0.10 | 0.09 | 0.14 |
| Total unit costs | 1.82 | 1.95 | 5.54 | 1.81 | 1.99 | 6.09 |
| Revenue adjustments, primarily for pricing on prior period open sales | 0.01 | 0.01 | 0.21 | 0.06 | 0.06 | 0.22 |
| Gross profit per pound | $1.41 | $1.28 | $2.66 | $1.79 | $1.61 | $2.53 |
| Copper sales (millions of recoverable pounds) | 224 | 224 |  | 151 | 151 |  |
| Cobalt sales (millions of contained pounds) |  |  | 11 |  |  | 11 |

a. Includes point-of-sale transportation costs as negotiated in customer contracts.

Unit net cash costs (net of cobalt credits) for our Africa operations of $1.23 per pound of copper in both the second quarter and first six months of 2013, were consistent with unit net cash costs of $1.22 per pound in second-quarter 2012 and $1.23 per pound for the first six months of 2012. Unit net cash costs in the first six months of 2013 reflected higher sales volumes, offset by lower cobalt credits.

Assuming achievement of current sales volume and cost estimates, and an average cobalt market price of $12 per pound for the second half of 2013, we estimate that average unit net cash costs (net of cobalt credits) would approximate $1.24 per pound of copper for the year 2013, compared with $1.23 per pound in 2012. Africa's projected unit net cash costs would change by $0.035 per pound for each $2 per pound change in the average price of cobalt during the second half of 2013.

### Molybdenum Mines

We have two wholly owned molybdenum mines in North America – the Henderson underground mine and the Climax open-pit mine, both in Colorado. The Henderson and Climax mines produce high-purity, chemical-grade molybdenum concentrates, which are typically further processed into value-added molybdenum chemical products. The majority of the molybdenum concentrates produced at the Henderson and Climax mines, as well as from certain of our North and South America copper mines, are processed at our own conversion facilities.

Operating Data. Following is summary operating data for the molybdenum mines for the second quarters and first six months of 2013 and 2012:

| Molybdenum mines operating data | Three Months Ended June 30, 2013 | 2012 | Six Months Ended June 30, 2013 | 2012 |
| --- | ---: | ---: | ---: | ---: |
| Molybdenum production (millions of recoverable pounds) | 13 | 9 | 25 | 18 |
| Ore milled (metric tons per day)a | 39,000 | 22,000 | 37,400 | 20,900 |
| Average molybdenum ore grade (percent)a | 0.19 | 0.22 | 0.19 | 0.24 |

a. The 2013 periods reflect operating data for the Henderson and Climax mines; the 2012 periods reflect the operating data of only the Henderson mine as start-up activities were still underway for the Climax mine.

Refer to "Consolidated Results" for our consolidated molybdenum operating data, which includes sales of molybdenum produced at our molybdenum mines and at our North and South America copper mines, and refer to "Outlook" for projected consolidated molybdenum sales volumes.

Unit Net Cash Costs. Unit net cash costs per pound of molybdenum is a measure intended to provide investors with information about the cash-generating capacity of our mining operations expressed on a basis relating to the primary metal product for our respective operations. We use this measure for the same purpose and for monitoring operating performance by our mining operations. This information differs from measures of performance determined in accordance with U.S. GAAP and should not be considered in isolation or as a substitute for measures of performance determined in accordance with U.S. GAAP. This measure is presented by other metals mining companies, although our measure may not be comparable to similarly titled measures reported by other companies.

#### Gross Profit per Pound of Molybdenum

The following table summarizes the average unit net cash costs and gross profit per pound of molybdenum at the molybdenum mines for the second quarter and first six months of 2013 and of the Henderson mine for the second quarter and first six months of 2012. Refer to “Product Revenues and Production Costs” for a reconciliation of unit net cash costs per pound to production and delivery costs applicable to sales reported in our consolidated financial statements.

|  | Three Months Ended June 30, 2013a | 2012a | Six Months Ended June 30, 2013a | 2012a |
| --- | ---: | ---: | ---: | ---: |
| Revenues, excluding adjustmentsb | $12.13 | $15.11 | $12.33 | $15.07 |
| Site production and delivery, before net noncash and other costs shown below | 5.84 | 5.95 | 6.10 | 5.98 |
| Treatment charges and other | 0.95 | 0.88 | 0.95 | 0.87 |
| Unit net cash costs | 6.79 | 6.83 | 7.05 | 6.85 |
| Depreciation, depletion and amortization | 1.65 | 0.95 | 1.64 | 0.93 |
| Noncash and other costs, net | 0.18 | 0.25 | 0.16 | 0.06 |
| Total unit costs | 8.62 | 8.03 | 8.85 | 7.84 |
| Gross profit | $3.51 | $7.08 | $3.48 | $7.23 |
| Molybdenum production (millions of recoverable pounds)b | 13 | 8 | 25 | 17 |

61 a. The 2013 periods reflect operating data for the Henderson and Climax mines; the 2012 periods reflect the results of only the Henderson mine as startup activities were still underway for the Climax mine.

b. Revenues reflect sales of the molybdenum mines' production to our molybdenum sales company at market-based pricing. On a consolidated basis, realizations are based on actual contract terms of sales made to third parties. As a result, our consolidated average realized price per pound of molybdenum (refer to "Consolidated Results") will differ from the amounts reported in this table.

Average unit net cash costs for our molybdenum mines totaled $6.79 per pound of molybdenum in second-quarter 2013 and $7.05 per pound for the first six months of 2013, compared with Henderson's unit net cash costs of $6.83 per pound in second-quarter 2012 and $6.85 per pound for the first six months of 2012. Assuming achievement of current sales volume and cost estimates, we estimate average unit net cash costs for our molybdenum mines to average approximately $7.10 per pound of molybdenum for the year 2013.

### Atlantic Copper Smelting & Refining

Atlantic Copper, our wholly owned subsidiary located in Spain, smelts and refines copper concentrates and markets refined copper and precious metals in slimes. During the first six months of 2013, Atlantic Copper purchased 33 percent of its concentrate requirements from our South America mining operations, 18 from our Indonesia mining operations and 16 percent from our North America copper mines, with the remainder purchased from third parties. Through this form of downstream integration, we are assured placement of a significant portion of our concentrate production.

Smelting and refining charges consist of a base rate and, in certain contracts, price participation based on copper prices. Treatment charges for smelting and refining copper concentrates represent a cost to our mining operations, and income to Atlantic Copper and PT Smelting. Thus, higher treatment and refining charges benefit our smelter operations and adversely affect our mining operations.

Atlantic Copper is planning a 60-day major maintenance turnaround beginning in September 2013, which is expected to have a net impact of approximately $45 million on second-half 2013 operating results.

We defer recognizing profits on sales from our mining operations to Atlantic Copper and on 25 percent of Indonesia mining sales to PT Smelting until final sales to third parties occur. Changes in these deferrals attributable to variability in intercompany volumes resulted in net additions (reductions) to net income attributable to common stockholders totaling $2 million in second-quarter 2013 and $27 million for the first six months of 2013, compared with $17 million in second-quarter 2012 and $(35) million for the first six months of 2012. Our net deferred profits on our inventories at Atlantic Copper and PT Smelting to be recognized in future periods’ net income attributable to common stockholders totaled $31 million at June 30, 2013. Quarterly variations in ore grades, the timing of intercompany shipments and changes in product prices will result in variability in our net deferred profits and quarterly earnings.

### Oil and Gas

Our recently acquired oil and gas business (FM O&G) provides exposure to energy markets with positive fundamentals, strong margins and cash flows and a large resource base with financially attractive exploration and development investment opportunities. The portfolio of assets includes significant oil production facilities and growth potential in the Deepwater GOM, strong oil production from the onshore Eagle Ford shale play in Texas, established oil production facilities onshore and offshore California, large onshore resources in the Haynesville natural gas shale play in Louisiana and an industry leading position in the emerging shallow water, ultra-deep gas trend on the Shelf of the GOM and onshore in South Louisiana. Excluding the impact of derivative instruments, approximately 90 percent of our oil and gas revenues are from oil and NGLs.

Exploration, Operating and Development Activities. Our oil and gas business has significant reserves with financially attractive organic growth opportunities. The portfolio includes a broad range of relatively low-risk development opportunities and high-potential exploration prospects. The business will be managed to reinvest its cash flows in projects with attractive rates of returns and risk profiles.

Capital expenditures for our oil and gas operations totaled $190 million during June 2013, including $77 million in Eagle Ford, $52 million in GOM (including GOM Shelf), $30 million in California and $18 million in the ultra-deep gas trend. Capital expenditures for our oil and gas operations are expected to approximate $1.3 billion for the second half of 2013, including approximately $0.4 billion in the Deepwater GOM, $0.4 billion in Eagle Ford and $0.2 billion in the ultra-deep gas trend. Capital expenditures for our oil and gas operations are expected to be funded by their operating cash flows. In addition, we are undertaking a plan to divest certain conventional GOM Shelf oil and gas properties and may consider potential additional sales or partnering arrangements, depending on market conditions (refer to "Capital Resources and Liquidity" for further discussion).

*GOM.* Multiple development and exploration opportunities have been identified in the Deepwater GOM that are expected to benefit from tieback opportunities to available production capacity at the large-scale Holstein, Marlin and Horn Mountain deepwater production platforms, which are operated by FM O&G. We have contracted three drill ships to drill and evaluate deepwater prospects, two of which are currently under construction. Completion of construction and delivery of these drill ships is expected mid-2014 and early 2015, respectively.

At the Lucius development in Keathley Canyon (in which FM O&G has a 23.33 percent working interest) five of the six planned wells have been drilled with the sixth well currently in progress. In December 2011, the operator and its working interest partners sanctioned development of Lucius, a subsea development consisting of a truss spar hull located in 7,200 feet of water with a topside capacity of 80 MBbls of oil per day and 450 MMcf of gas per day. First production is anticipated in the second half of 2014.

In April 2013, the operator of the Phobos prospect (in which FM O&G has a 50 percent working interest) announced that the Phobos-1 well encountered approximately 250 net feet of high quality oil pay in Lower Tertiary reservoirs. The Phobos discovery is located in approximately 8,500 feet of water, approximately 11 miles south of the Lucius development. Phobos' close proximity to Lucius could enhance the economics of this project. The operator and partners are incorporating the data from the Phobos-1 well to determine future plans.

*Eagle Ford.* We have an attractive position in a section of the Eagle Ford shale play rich in oil and NGLs, located in South Texas. Production from the field has grown significantly in recent years and totaled 43 MBOE per day in June 2013. At June 30, 2013, we had six drilling rigs operating. As part of our capital reduction initiatives, we expect to reduce drilling activity at Eagle Ford over the next several quarters. Our Eagle Ford acreage position provides flexibility to manage our drilling program to meet capital spending and cash flow objectives.

*California.* Our development plans are principally focused on maintaining stable production levels in our long established producing fields principally onshore in California.

*Haynesville.* We have rights to a substantial natural gas resource located in the Haynesville shale play in North Louisiana. Drilling activities in recent years have been significantly reduced as a result of low natural gas prices. The field is currently being operated to maximize cash flows in a low natural gas price environment. FM O&G has flexibility to manage its drilling program while preserving its large resource to benefit from potentially higher future natural gas prices.

*Ultra-deep Trend.* We have a leading industry position in the emerging ultra-deep trend with a significant onshore and offshore lease acreage position with high quality prospects and the potential to develop a significant long-term, low-cost source of natural gas. Data from seven wells drilled to date indicate the presence of geologic formations that are analogous to productive formations in the Deepwater GOM and onshore in the Gulf Coast region. The near-term focus is on further defining the trend onshore. We currently have two onshore ultra-deep exploration prospects in-progress, including Lineham Creek (in which FM O&G has a 36 percent working interest) and Lomond North in the Highlander area (in which FM O&G has a 72 percent working interest). Our 2014 development plans are expected to include activities at the Davy Jones No. 2 well (in which FM O&G has a 63.4 percent working interest) and Blackbeard West No. 1 well (in which FM O&G has a 69.4 percent working interest).

Financial and Operating Data. The following table reflects the summary operating results of our oil and gas operations for June 2013:

| Sales Volumes |  |  |
| --- | ---: | --- |
| Oil (MMBbls) | 3.4 |  |
| Natural gas (Bcf) | 7.7 |  |
| NGLs (MMBbls) | 0.3 |  |
| MMBOE | 5.0 |  |
| **Average Realizations** |  |  |
| Oil (per barrel) | $97.42 | a |
| Natural gas (per MMbtu) | $3.86 | a |
| NGLs (per barrel) | $35.18 | a |
| **Gross Profit per BOE** |  |  |
| Realized revenues | $74.37 | a |
| Less: Cash production costs | 16.58 | a |
| Cash operating margin | 57.79 | a |
| Less: Depreciation, depletion and amortization | 33.82 |  |
| Less: Accretion and other costs | 1.11 |  |
| Revenue adjustments for unrealized losses on derivative instruments | (7.27) |  |
| Other net adjustments | (0.02) |  |
| Gross profit | $15.57 |  |

a. Cash operating margin for our oil and gas operations reflects realized revenues less cash production costs. Realized revenues exclude unrealized gains (losses) on derivative instruments and cash production costs exclude accretion and other costs. For reconciliations of realized revenues (including average realizations for oil, natural gas and NGLs) and cash production costs per BOE to revenues and production and delivery costs reported in our consolidated financial statements, refer to "Product Revenues and Production Costs."

In June 2013, realized revenues for our oil and gas operations averaged $74.37 per BOE and cash production costs averaged $16.58 per BOE, resulting in a cash operating margin of $57.79 per BOE. Based on current sales volume and cost estimates for the second half of 2013, cash production costs are expected to approximate $19 per BOE for the year 2013 (reflecting results beginning June 1, 2013).

During June 2013, Brent crude oil price averaged $103.38 per barrel. Our average realized price for crude oil in June 2013 was $97.42 per barrel, or 94 percent of Brent. Excluding the impact of derivative instruments, the June 2013 average realized price for crude oil was $97.05 per barrel.

During June 2013, the NYMEX gas price for the June 2013 contract was $4.15 per MMBtu. Our average realized price for natural gas in June 2013 was $3.86 per MMBtu, or approximately 93 percent of NYMEX. Excluding the impact of derivative instruments, the June 2013 average realized price for natural gas was $3.81 per MMBtu.

The following table presents sales volumes per day by region for our oil and gas operations in June 2013:

| Sales Volumes (MBOE per day): |  |
| --- | ---: |
| GOMa | 64 |
| Eagle Ford | 43 |
| California | 37 |
| Haynesville/Madden/Other | 25 |
| Total oil and gas operations | 169 |

a. Includes sales from properties on the GOM Shelf and in the Deepwater GOM. Production from the GOM Shelf totaled 15 MBOE per day in June 2013, approximating 22 percent of the GOM total.

Daily sales volumes averaged 169 MBOE in June 2013, including 114 MBbls of crude oil per day, 263 MMcf of natural gas per day and 11 MBbls of NGLs per day. For the second half of 2013, sales volumes from our oil and gas operations are expected to average 163 MBOE per day, comprised of 67 percent oil, 27 percent natural gas and 6 percent NGLs.

### CAPITAL RESOURCES AND LIQUIDITY

Our operating cash flows vary with prices realized from copper, gold, molybdenum and oil, our sales volumes, production costs, income taxes, other working capital changes and other factors. During second-quarter 2013, we took actions to reduce capital expenditures and other costs, and initiated efforts to identify potential asset sales to reduce debt and maintain financial strength and flexibility in response to recent declines in metals prices. As a first step, we have reduced our budgeted future capital expenditures, exploration and other costs by a total of $1.9 billion in 2013 and 2014, including $1.0 billion in reductions and deferrals of mining capital projects, $0.4 billion in reduced oil and gas investments and $0.5 billion in reduced minerals exploration, research and other costs. Capital spending plans remain under review and will be revised as market conditions warrant.

We have also initiated a process to divest certain oil and gas properties from our conventional GOM Shelf properties. We have a broad set of natural resource assets which provide many alternatives for future actions to enhance our financial flexibility and value for shareholders. Additional capital cost reductions and divestitures will be pursued as required to maintain a strong balance sheet while preserving a strong resource position and portfolio of assets with attractive long-term growth prospects.

### Cash

Following is a summary of the U.S. and international components of consolidated cash and cash equivalents, including cash available to the parent company, net of noncontrolling interests' share, taxes and other costs at June 30, 2013, and December 31, 2012 (in billions):

|  | June 30, 2013 |  | December 31, 2012 |
| --- | ---: | --- | ---: |
| Cash at domestic companies | $1.3 |  | $1.3 |
| Cash at international operations | 2.0 |  | 2.4 |
| Total consolidated cash and cash equivalents | 3.3 |  | 3.7 |
| Less: Noncontrolling interests’ share | (0.8) |  | (0.8) |
| Cash, net of noncontrolling interests’ share | 2.5 |  | 2.9 |
| Less: Withholding taxes and other | (0.1) |  | (0.2) |
| Net cash available | $2.4 | a | $2.7 |

a. On July 1, 2013, we paid a $1.00 per share supplemental common stock dividend for a total of $1.0 billion.

Cash held at our international operations is generally used to support our foreign operations' capital expenditures, operating expenses, working capital and other tax payments, or other cash needs. Management believes that sufficient liquidity is available in the U.S. With the exception of TFM, we have not elected to permanently reinvest earnings from our foreign subsidiaries, and we have recorded deferred tax liabilities for foreign earnings that are available to be repatriated to the U.S. From time to time, our foreign subsidiaries distribute earnings to the U.S. through dividends, which are subject to applicable withholding taxes and noncontrolling interests' share.

### Debt

Following is a summary of total debt and related weighted-average interest rates at June 30, 2013:

*(in billions)*

|  | June 30, 2013 |  | Weighted- Average Interest Rate |
| --- | ---: | --- | ---: |
| Acquisition-related debt | $10.5 | a | 3.1% |
| Assumed debt of PXP and MMR | 7.1 | b | 7.0% |
| FCX's previously existing debt | 3.6 |  | 3.5% |
|  | $21.2 |  | 4.4% |

a. We used the proceeds from the issuance of $6.5 billion of senior notes and a $4.0 billion bank term loan to finance the acquisitions of PXP and MMR and repay certain PXP debt. Refer to Note 7 for further discussion.

b. Refer to Note 7 for further discussion of repayments of debt assumed in the acquisitions of PXP and MMR.

We have established a plan to reduce debt and we are targeting reductions that will reduce total debt to $12 billion over the next three years.

Upon closing of the PXP acquisition, we replaced our revolving credit facility that was scheduled to expire in March 2016 with a new $3.0 billion senior unsecured revolving credit facility, which is available through May 2018. At

June 30, 2013, we had no borrowings outstanding and $46 million of letters of credit issued under our revolving credit facility, resulting in availability of $3.0 billion. Refer to Note 7 for further discussion.

### Operating Activities

During the first six months of 2013, we generated operating cash flows totaling $1.9 billion (net of $195 million for working capital uses and changes in other tax payments), compared with operating cash flows for the first six months of 2012 totaled $2.0 billion (net of $774 million for working capital uses and changes in other tax payments). The decrease in net working capital uses and changes in other tax payments was primarily associated with changes in accounts receivable. As discussed in "Consolidated Results - Revenues," substantially all of our copper concentrate and cathode sales contracts are provisionally priced; accordingly, the quarter-end forward price is a major determinate of recorded revenues and the resulting receivables. At June 30, 2013, our provisionally prices copper sales we recorded at an average of $3.06 per pound of copper, compared with $3.49 per pound at June 30, 2012.

Based on current operating plans and subject to future copper, gold, molybdenum and oil prices, we expect estimated operating cash flows for the year 2013 plus available cash to be sufficient to fund our budgeted capital expenditures, dividends, noncontrolling interest distributions and other cash requirements for the year. Refer to “Outlook” for further discussion of projected operating cash flows for the year 2013.

### Investing Activities

Capital Expenditures. Capital expenditures, including capitalized interest, totaled $2.0 billion for the first six months of 2013 (including $190 million for oil and gas operations beginning June 1, 2013), compared with $1.5 billion for the first six months of 2012. Higher capital expenditures for our mining operations in first six months of 2013 primarily reflected increased capital spending associated with the expansion projects at Morenci and Cerro Verde and our underground development activities at Grasberg, partly offset by decreased spending for the second phase expansion at Tenke and at the Climax mine relating to completion of the related projects. Refer to “Operations” for further discussion.

Capital expenditures are expected to approximate $5.5 billion for the year 2013, including $2.3 billion for major projects at our mining operations and $1.5 billion for our oil and gas operations (for the period beginning June 1, 2013). Major projects at our mines for 2013 primarily include the expansion projects at Cerro Verde and Morenci and underground development activities at Grasberg. Capital expenditures for our oil and gas operations are expected to be funded by its operating cash flows. Capital spending plans will continue to be reviewed and adjusted in response to changes in market conditions and other factors. Refer to "Operations" for further discussion.

Acquisitions. In second-quarter 2013, we paid $3.5 billion in cash (net of $315 million cash acquired) for the acquisition of PXP and $1.6 billion in cash (net of $29 million cash acquired) for the acquisition of MMR. Refer to Note 2 for further discussion.

In first-quarter 2013, we paid $321 million (net of $34 million of cash acquired) to fund the acquisition of a large-scale cobalt chemical refinery in Kokkola, Finland, and the related sales and marketing business. The acquisition was funded 70 percent by us and 30 percent by Lundin, which amounts will be repaid prior to any shareholder distributions. Refer to Note 2 for further discussion.

### Financing Activities

Debt Transactions. In first-quarter 2013, we sold $6.5 billion of senior notes in four tranches with a weighted average interest rate of 3.9 percent, and in second-quarter 2013, we borrowed $4.0 billion under a bank term loan with an interest rate of LIBOR plus 1.50 percent. Net proceeds from these borrowings were used to fund the acquisitions of PXP and MMR and repay certain debt of PXP assumed in the acquisitions. Refer to Note 7 for further discussion.

In first-quarter 2012, we sold $3.0 billion of senior notes in three tranches with a weighted-average interest rate of approximately 3.0 percent. Net proceeds from this offering, plus cash on hand, were used to redeem the remaining $3.0 billion of our 8.375% Senior Notes. Refer to Note 7 for further discussion.

Dividends and Other Equity Transactions. We paid dividends on our common stock totaling $595 million for the first six months of 2013 and $535 million for the first six months of 2012. The current annual dividend rate for our common stock is $1.25 per share ($0.3125 per share quarterly). In addition to our regular quarterly dividend, in second-quarter 2013, the Board declared a supplemental common stock dividend of $1.00 per share that was paid on July 1, 2013, and totaled $1.0 billion (refer to Note 7 for further discussion). The declaration of dividends is at the discretion of the Board and will depend upon our financial results, cash requirements, future prospects and other factors deemed relevant by the Board. The Board will continue to review our financial policy on an ongoing basis.

Cash dividends and other distributions paid to noncontrolling interests totaled $90 million for the first six months of 2013 and $38 million for the first six months of 2012.

During second-quarter 2013, the make-whole premiums triggered by our acquisition of MMR resulted in the payment of $202 million for the conversion of MMR's 5.75% Convertible Perpetual Preferred Stock and 8% Convertible Perpetual Preferred Stock (refer to Note 12 for further discussion).

### CONTRACTUAL OBLIGATIONS

In connection with the acquisitions of PXP and MMR, contractual obligations (including debt) as of June 30, 2013, have increased compared to December 31, 2012. The following table, as of June 30, 2013, reflects an update to the similar table presented in our annual report on Form 10-K for the year ended December 31, 2012, and the effect such obligations are expected to have on our liquidity and cash flows in future periods for those obligations with significant changes (in millions):

|  | Total | Remainder of 2013 | 2014 to 2015 | 2016 to 2017 | Thereafter |
| --- | ---: | ---: | ---: | ---: | ---: |
| Debt maturities | $21,215 | $70 | $1,666 | $1,477 | $18,002 |
| Scheduled interest payment obligationsa | 9,173 | 453 | 1,728 | 1,641 | 5,351 |
| Reclamation and environmental obligationsb | 6,520 | 141 | 467 | 327 | 5,585 |
| Take-or-pay contractsc | 4,581 | 2,286 | 1,481 | 448 | 366 |
| Totald | $41,489 | $2,950 | $5,342 | $3,893 | $29,304 |

a. Scheduled interest payment obligations were calculated using stated coupon rates for fixed-rate debt and interest rates applicable at June 30, 2013, for variable-rate debt.

b. Represents estimated cash payments, on an undiscounted and unescalated basis, associated with reclamation and environmental activities (including $1.3 billion for our recently acquired oil and gas operations). The timing and the amount of these payments could change as a result of changes in regulatory requirements, changes in scope and timing of reclamation activities, the settlement of environmental matters and as actual spending occurs. Refer to Note 8 (and also to Note 13 in our annual report on Form 10-K for the year ended December 31, 2012), for additional discussion of environmental and reclamation matters.

c. Represents contractual obligations for purchases of goods or service agreements enforceable and legally binding and that specify all significant terms, including $2.2 billion for our recently acquired oil and gas operations, which primarily includes ultra-deepwater drillships for the GOM drilling campaign ($1.3 billion) and deferred derivative premiums and accrued interest ($490 million). The remaining take-or-pay contracts primarily comprise the procurement of copper concentrates ($1.0 billion), electricity ($507 million) and transportation services ($495 million). Some of our take-or-pay contracts are settled based on the prevailing market rate for the service or commodity purchased, and in some cases, the amount of the actual obligation may change over time because of market conditions. Obligations for copper concentrates provide for deliveries of specified volumes to Atlantic Copper at market-based prices. Electricity obligations are primarily for contractual minimum demand at the South America and Tenke mines. Transportation obligations are primarily for South America contracted ocean freight and for North America rail freight.

d. This table excludes operating lease obligations and certain other obligations in our consolidated balance sheets, including estimated funding for pension obligations as the funding may vary from year to year based on changes in the fair value of plan assets and actuarial assumptions, accrued liabilities that relate to unrecognized tax benefits where the timing of settlement is not determinable; and others that are further described in our annual report on form 10-K for the year ended December 31, 2012. This table also excludes purchase orders for the purchase of inventory and other goods and services, as purchase orders typically represent authorizations to purchase rather than binding agreements.

### CONTINGENCIES

### Environmental and Reclamation Matters

Our current and historical operating activities are subject to stringent laws and regulations governing the protection of the environment. We perform a comprehensive annual review of our environmental and reclamation obligations and also review changes in facts and circumstances associated with these obligations at least quarterly. During second-quarter 2013, we assumed $1.0 billion of reclamation obligations associated with our recently acquired oil and gas operations. Updated cost assumptions, including increases and decreases to cost estimates, changes in the anticipated scope and timing of remediation activities and settlement of environmental matters may result in revisions to certain of our environmental obligations. We recorded adjustments to environmental obligations totaling $2 million in second-quarter 2013, $1 million for the first six months of 2013, and $46 million for both the second quarter and first six months of 2012.

Refer to Note 8 (and also to Note 13 in our annual report on Form 10-K for the year ended December 31, 2012), for further information regarding our environmental and reclamation obligations.

### Litigation and Other Contingencies

Other than as disclosed in Note 8 and contained in "Legal Proceedings" in Part II, Item 1. of this quarterly report, there have been no material changes to our contingencies associated with legal proceedings and other matters since the end of 2012. Refer to Note 13 and "Legal Proceedings" contained in Part I, Item 3. of our annual report on Form 10-K for the year ended December 31, 2012, for further information regarding legal proceedings and other matters.

### DISCLOSURE ABOUT MARKET RISKS

During second-quarter 2013, we completed the acquisitions of PXP and MMR. Accordingly, the following presents updated disclosures about market risks contained in our annual report on Form 10-K for the year ended December 31, 2012.

### Commodity Price Risk

In addition to the commodity price risk associated with the market prices of copper, gold and molybdenum, as described in our annual report on Form 10-K for the year ended December 31, 2012, our financial results may vary with fluctuations in oil prices. Market prices for crude oil have fluctuated historically and are affected by numerous factors beyond our control. Because we cannot control the price of our products, including oil, the key measure that management focuses on in operating our business are sales volumes, production costs and operating cash flows. Refer to “Outlook” for further discussion of projected sales volumes, unit net cash costs for our mining operations, cash production costs per BOE for our oil and gas operations and operating cash flows.

Our recently acquired oil and gas business has historically used derivative instruments to manage commodity price risk for a substantial portion of its oil and gas production. In connection with the acquisition of PXP, we assumed PXP's 2013, 2014 and 2015 derivative contracts that consist of crude oil options, and crude oil and natural gas swaps (refer to Note 9 for further discussion). As a result, we may not benefit fully from increases in oil and gas prices above the maximum fixed amount specified in the derivative contracts. The unfavorable impact of net adjustments to the derivative contracts we acquired in connection with our acquisition of PXP totaled $35 million ($27 million to net income attributable to common stock) in second-quarter 2013. Because the oil and gas derivative contracts do not qualify or are not designated as hedging instruments, they are recorded at fair value with the mark-to-market gains and losses recorded in revenues. We expect fluctuations in our consolidated statements of income as changes occur in the index prices.

Following presents the estimated impact of a 10 percent change in Brent crude oil and NYMEX forward prices on the fair values of outstanding oil and natural gas derivative instruments, compared with the forward prices used to determine the June 30, 2013, fair values:

|  | 10% Increase | 10% Decrease |
| --- | ---: | ---: |
| Crude oil puts | $(148) | $224 |
| Crude oil collars | (15) | 30 |
| Crude oil swaps | (74) | 74 |
| Natural gas swaps | (20) | 20 |
|  | $(257) | $348 |

68

Refer to Note 9 for further discussion of our oil and gas derivative positions at June 30, 2013.

These contracts may expose us to the risk of financial loss in certain circumstances. Our derivative arrangements provide us protection on the volumes if prices decline below the prices at which these derivatives are set, but ceiling prices in our derivatives may cause us to receive less revenue on the volumes than we would receive in the absence of derivatives.

### NEW ACCOUNTING STANDARDS

We do not expect the impact of recently issued accounting standards to have a significant impact on our future financial statements and disclosures.

### PRODUCT REVENUES AND PRODUCTION COSTS

**Mining Product Revenues and Unit Net Cash Cost.** Unit net cash costs per pound of copper and molybdenum are measures intended to provide investors with information about the cash-generating capacity of our mining operations expressed on a basis relating to the primary metal product for the respective operations. We use this measure for the same purpose and for monitoring operating performance by our mining operations. This information differs from measures of performance determined in accordance with U.S. GAAP and should not be considered in isolation or as a substitute for measures of performance determined in accordance with U.S. GAAP. This measure is presented by other metals mining companies, although our measures may not be comparable to similarly titled measures reported by other companies.

We present gross profit per pound of copper in the following tables using both a “by-product” method and a “co-product” method. We use the by-product method in our presentation of gross profit per pound of copper because (i) the majority of our revenues are copper revenues, (ii) we mine ore, which contains copper, gold, molybdenum and other metals, (iii) it is not possible to specifically assign all of our costs to revenues from the copper, gold, molybdenum and other metals we produce, (iv) it is the method used to compare mining operations in certain industry publications and (v) it is the method used by our management and the Board to monitor operations. In the co-product method presentation below, shared costs are allocated to the different products based on their relative revenue values, which will vary to the extent our metals sales volumes and realized prices change.

We show revenue adjustments for prior period open sales as separate line items. Because these adjustments do not result from current period sales, we have reflected these separately from revenues on current period sales. Noncash and other costs consist of items such as stock-based compensation costs, start-up costs, write-offs of equipment and/or unusual charges. They are removed from site production and delivery costs in the calculation of unit net cash costs. As discussed above, gold, molybdenum and other metal revenues at copper mines are reflected as credits against site production and delivery costs in the by-product method. The following schedules for our mining operations are presentations under both the by-product and co-product methods together with reconciliations to amounts reported in our consolidated financial statements.

**Oil & Gas Product Revenues and Cash Production Costs per Unit.** Realized revenues and cash production costs per unit are measures intended to provide investors with information about the cash operating margin of our oil and gas operations expressed on a basis relating to each BOE. We use this measure for the same purpose and for monitoring operating performance by our oil and gas operations. This information differs from measures of performance determined in accordance with U.S. GAAP and should not be considered in isolation or as a substitute for measures of performance determined in accordance with U.S. GAAP. Our measures may not be comparable to similarly titled measures reported by other companies.

Because gains and losses on derivative instruments do not result from sales of oil and gas, we have reflected these separately as adjustments to revenues. Additionally, accretion and other costs are removed from site production and delivery costs in the calculation of cash production costs per BOE. The following schedules include calculations of oil and natural gas product revenues and cash production costs together with a reconciliation to amounts reported in our consolidated financial statements.

### North America Copper Mines Product Revenues and Production Costs

*(In millions)*

| Three Months Ended June 30, 2013 | By-Product Method | Co-Product Method Copper | Molybdenuma | Otherb | Total |
| --- | ---: | ---: | ---: | ---: | ---: |
| Revenues, excluding adjustments | $1,205 | $1,205 | $98 | $26 | $1,329 |
| Site production and delivery, before net noncash and other costs shown below | 774 | 745 | 41 | 18 | 804 |
| By-product creditsa | (94) | — | — | — | — |
| Treatment charges | 31 | 30 | — | 1 | 31 |
| Net cash costs | 711 | 775 | 41 | 19 | 835 |
| Depreciation, depletion and amortization | 105 | 101 | 3 | 1 | 105 |
| Noncash and other costs, net | 29 | 29 | — | — | 29 |
| Total costs | 845 | 905 | 44 | 20 | 969 |
| Revenue adjustments, primarily for pricing on prior period open sales | (14) | (14) | — | — | (14) |
| Gross profit | $346 | $286 | $54 | $6 | $346 |
| Copper sales (millions of recoverable pounds) | 370 | 370 |  |  |  |
| Molybdenum sales (millions of recoverable pounds)a |  |  | 9 |  |  |
| Gross profit per pound of copper and molybdenum: |  |  |  |  |  |
| Revenues, excluding adjustments | $3.25 | $3.25 | $11.17 |  |  |
| Site production and delivery, before net noncash |  |  |  |  |  |
| and other costs shown below | 2.09 | 2.01 | 4.63 |  |  |
| By-product creditsa | (0.25) | — | — |  |  |
| Treatment charges | 0.08 | 0.08 | — |  |  |
| Unit net cash costs | 1.92 | 2.09 | 4.63 |  |  |
| Depreciation, depletion and amortization | 0.28 | 0.27 | 0.30 |  |  |
| Noncash and other costs, net | 0.08 | 0.08 | 0.04 |  |  |
| Total unit costs | 2.28 | 2.44 | 4.97 |  |  |
| Revenue adjustments, primarily for pricing |  |  |  |  |  |
| on prior period open sales | (0.04) | (0.04) | — |  |  |
| Gross profit per pound | $0.93 | $0.77 | $6.20 |  |  |
| Reconciliation to Amounts Reported |  |  |  |  |  |
| (In millions) | Revenues | Production and Delivery | Depreciation, Depletion and Amortization |  |  |
| Totals presented above | $1,329 | $804 | $105 |  |  |
| Treatment charges | — | 31 | — |  |  |
| Net noncash and other costs | — | 29 | — |  |  |
| Revenue adjustments, primarily for pricing on prior period open sales | (14) | — | — |  |  |
| Eliminations and other | (6) | (11) | 3 |  |  |
| North America copper mines | 1,309 | 853 | 108 |  |  |
| Other mining & eliminationsc | 2,642 | 1,906 | 250 |  |  |
| Total mining | 3,951 | 2,759 | 358 |  |  |
| Oil & Gas operations | 336 | 89 | 169 |  |  |
| Corporate, other & eliminations | 1 | 5 | 3 |  |  |
| As reported in FCX’s consolidated financial statements | $4,288 | $2,853 | $530 |  |  |

a. Reflects sales of molybdenum produced by certain of the North America copper mines to our molybdenum sales company at market-based pricing.

b. Includes gold and silver product revenues and production costs.

c. Represents the combined total for all other mining operations and the related eliminations, as presented in Note 13.

### North America Copper Mines Product Revenues and Production Costs (continued)

*(In millions)*

| Three Months Ended June 30, 2012 By-Product Method | Co-Product Method Copper | Molybdenuma | Otherb | Total |
| --- | ---: | ---: | ---: | ---: |
| Revenues, excluding adjustments $1,286 | $1,286 | $121 | $21 | $1,428 |
| Site production and delivery, before net noncash and other costs shown below 676 | 614 | 62 | 12 | 688 |
| By-product creditsa (130) | — | — | — | — |
| Treatment charges 38 | 37 | — | 1 | 38 |
| Net cash costs 584 | 651 | 62 | 13 | 726 |
| Depreciation, depletion and amortization 90 | 84 | 5 | 1 | 90 |
| Noncash and other costs, net 38 | 37 | 1 | — | 38 |
| Total costs 712 | 772 | 68 | 14 | 854 |
| Revenue adjustments, primarily for pricing on prior period open sales (8) | (8) | — | — | (8) |
| Gross profit $566 | $506 | $53 | $7 | $566 |
| Copper sales (millions of recoverable pounds) 360 | 360 |  |  |  |
| Molybdenum sales (millions of recoverable pounds)a |  | 9 |  |  |
| Gross profit per pound of copper and molybdenum: |  |  |  |  |
| Revenues, excluding adjustments $3.57 | $3.57 | $13.53 |  |  |
| Site production and delivery, before net noncash |  |  |  |  |
| and other costs shown below 1.88 | 1.71 | 7.00 |  |  |
| By-product creditsa (0.36) | — | — |  |  |
| Treatment charges 0.10 | 0.10 | — |  |  |
| Unit net cash costs 1.62 | 1.81 | 7.00 |  |  |
| Depreciation, depletion and amortization 0.25 | 0.23 | 0.57 |  |  |
| Noncash and other costs, net 0.11 | 0.10 | 0.07 |  |  |
| Total unit costs 1.98 | 2.14 | 7.64 |  |  |
| Revenue adjustments, primarily for pricing |  |  |  |  |
| on prior period open sales (0.02) | (0.02) | — |  |  |
| Gross profit per pound $1.57 | $1.41 | $5.89 |  |  |
| Reconciliation to Amounts Reported |  |  |  |  |
| (In millions) Revenues | Production and Delivery | Depreciation, Depletion and Amortization |  |  |
| Totals presented above $1,428 | $688 | $90 |  |  |
| Treatment charges — | 38 | — |  |  |
| Net noncash and other costs — | 38 | — |  |  |
| Revenue adjustments, primarily for pricing on prior period open sales (8) | — | — |  |  |
| Eliminations and other 8 | (2) | 3 |  |  |
| North America copper mines 1,428 | 762 | 93 |  |  |
| Other mining & eliminationsc 3,045 | 1,859 | 196 |  |  |
| Total mining 4,473 | 2,621 | 289 |  |  |
| Oil & Gas operations — | — | — |  |  |
| Corporate, other & eliminations 2 | 1 | 2 |  |  |
| As reported in FCX’s consolidated financial statements $4,475 | $2,622 | $291 |  |  |

a. Reflects sales of molybdenum produced by certain of the North America copper mines to our molybdenum sales company at market-based pricing.

b. Includes gold and silver product revenues and production costs.

c. Represents the combined total for all other mining operations and the related eliminations, as presented in Note 13.

### North America Copper Mines Product Revenues and Production Costs (continued)

*(In millions)*

| Six Months Ended June 30, 2013 | By-Product Method | Co-Product Method Copper | Molybdenuma | Otherb | Total |
| --- | ---: | ---: | ---: | ---: | ---: |
| Revenues, excluding adjustments | $2,463 | $2,463 | $191 | $53 | $2,707 |
| Site production and delivery, before net noncash and other costs shown below | 1,477 | 1,430 | 66 | 38 | 1,534 |
| By-product creditsa | (187) | — | — | — | — |
| Treatment charges | 76 | 74 | — | 2 | 76 |
| Net cash costs | 1,366 | 1,504 | 66 | 40 | 1,610 |
| Depreciation, depletion and amortization | 204 | 197 | 4 | 3 | 204 |
| Noncash and other costs, net | 60 | 59 | 1 | — | 60 |
| Total costs | 1,630 | 1,760 | 71 | 43 | 1,874 |
| Revenue adjustments, primarily for pricing on prior period open sales | (4) | (4) | — | — | (4) |
| Gross profit | $829 | $699 | $120 | $10 | $829 |
| Copper sales (millions of recoverable pounds) | 722 | 722 |  |  |  |
| Molybdenum sales (millions of recoverable pounds)a |  |  | 17 |  |  |
| Gross profit per pound of copper and molybdenum: |  |  |  |  |  |
| Revenues, excluding adjustments | $3.41 | $3.41 | $11.45 |  |  |
| Site production and delivery, before net noncash |  |  |  |  |  |
| and other costs shown below | 2.04 | 1.98 | 3.98 |  |  |
| By-product creditsa | (0.26) | — | — |  |  |
| Treatment charges | 0.11 | 0.10 | — |  |  |
| Unit net cash costs | 1.89 | 2.08 | 3.98 |  |  |
| Depreciation, depletion and amortization | 0.28 | 0.27 | 0.26 |  |  |
| Noncash and other costs, net | 0.08 | 0.08 | 0.04 |  |  |
| Total unit costs | 2.25 | 2.43 | 4.28 |  |  |
| Revenue adjustments, primarily for pricing |  |  |  |  |  |
| on prior period open sales | (0.01) | (0.01) | — |  |  |
| Gross profit per pound | $1.15 | $0.97 | $7.17 |  |  |
| Reconciliation to Amounts Reported |  |  |  |  |  |
| (In millions) | Revenues | Production and Delivery | Depreciation, Depletion and Amortization |  |  |
| Totals presented above | $2,707 | $1,534 | $204 |  |  |
| Treatment charges | — | 76 | — |  |  |
| Net noncash and other costs | — | 60 | — |  |  |
| Revenue adjustments, primarily for pricing on prior period open sales | (4) | — | — |  |  |
| Eliminations and other | (9) | (18) | 6 |  |  |
| North America copper mines | 2,694 | 1,652 | 210 |  |  |
| Other mining & eliminationsc | 5,838 | 3,823 | 475 |  |  |
| Total mining | 8,532 | 5,475 | 685 |  |  |
| Oil & Gas operations | 336 | 89 | 169 |  |  |
| Corporate, other & eliminations | 3 | 8 | 5 |  |  |
| As reported in FCX’s consolidated financial statements | $8,871 | $5,572 | $859 |  |  |

a. Reflects sales of molybdenum produced by certain of the North America copper mines to our molybdenum sales company at market-based pricing.

b. Includes gold and silver product revenues and production costs.

c. Represents the combined total for all other mining operations and the related eliminations, as presented in Note 13.

### North America Copper Mines Product Revenues and Production Costs (continued)

*(In millions)*

| Six Months Ended June 30, 2012 | By-Product Method | Co-Product Method Copper | Molybdenuma | Otherb | Total |
| --- | ---: | ---: | ---: | ---: | ---: |
| Revenues, excluding adjustments | $2,566 | $2,566 | $257 | $42 | $2,865 |
| Site production and delivery, before net noncash and other costs shown below | 1,283 | 1,198 | 91 | 24 | 1,313 |
| By-product creditsa | (269) | — | — | — | — |
| Treatment charges | 79 | 76 | — | 3 | 79 |
| Net cash costs | 1,093 | 1,274 | 91 | 27 | 1,392 |
| Depreciation, depletion and amortization | 179 | 169 | 7 | 3 | 179 |
| Noncash and other costs, net | 59 | 58 | 1 | — | 59 |
| Total costs | 1,331 | 1,501 | 99 | 30 | 1,630 |
| Revenue adjustments, primarily for pricing on prior period open sales | 7 | 7 | — | — | 7 |
| Gross profit | $1,242 | $1,072 | $158 | $12 | $1,242 |
| Copper sales (millions of recoverable pounds) | 697 | 697 |  |  |  |
| Molybdenum sales (millions of recoverable pounds)a |  |  | 19 |  |  |
| Gross profit per pound of copper and molybdenum: |  |  |  |  |  |
| Revenues, excluding adjustments | $3.68 | $3.68 | $13.83 |  |  |
| Site production and delivery, before net noncash |  |  |  |  |  |
| and other costs shown below | 1.84 | 1.72 | 4.92 |  |  |
| By-product creditsa | (0.39) | — | — |  |  |
| Treatment charges | 0.12 | 0.11 | — |  |  |
| Unit net cash costs | 1.57 | 1.83 | 4.92 |  |  |
| Depreciation, depletion and amortization | 0.26 | 0.24 | 0.37 |  |  |
| Noncash and other costs, net | 0.08 | 0.08 | 0.04 |  |  |
| Total unit costs | 1.91 | 2.15 | 5.33 |  |  |
| Revenue adjustments, primarily for pricing |  |  |  |  |  |
| on prior period open sales | 0.01 | 0.01 | — |  |  |
| Gross profit per pound | $1.78 | $1.54 | $8.50 |  |  |
| Reconciliation to Amounts Reported |  |  |  |  |  |
| (In millions) | Revenues | Production and Delivery | Depreciation, Depletion and Amortization |  |  |
| Totals presented above | $2,865 | $1,313 | $179 |  |  |
| Treatment charges | — | 79 | — |  |  |
| Net noncash and other costs | — | 59 | — |  |  |
| Revenue adjustments, primarily for pricing on prior period open sales | 7 | — | — |  |  |
| Eliminations and other | 10 | (4) | 7 |  |  |
| North America copper mines | 2,882 | 1,447 | 186 |  |  |
| Other mining & eliminationsc | 6,194 | 3,603 | 368 |  |  |
| Total mining | 9,076 | 5,050 | 554 |  |  |
| Oil & Gas operations | — | — | — |  |  |
| Corporate, other & eliminations | 4 | — | 4 |  |  |
| As reported in FCX’s consolidated financial statements | $9,080 | $5,050 | $558 |  |  |

a. Reflects sales of molybdenum produced by certain of the North America copper mines to our molybdenum sales company at market-based pricing.

b. Includes gold and silver product revenues and production costs.

c. Represents the combined total for all other mining operations and the related eliminations, as presented in Note 13.

### South America Mining Product Revenues and Production Costs

*(In millions)*

| Three Months Ended June 30, 2013 | By-Product Method | Co-Product Method Copper | Other |  | Total |
| --- | ---: | ---: | ---: | --- | ---: |
| Revenues, excluding adjustments | $986 | $986 | $80 | a | $1,066 |
| Site production and delivery, before net noncash and other costs shown below | 511 | 472 | 45 |  | 517 |
| By-product credits | (74) | — | — |  | — |
| Treatment charges | 49 | 49 | — |  | 49 |
| Net cash costs | 486 | 521 | 45 |  | 566 |
| Depreciation, depletion and amortization | 86 | 80 | 6 |  | 86 |
| Noncash and other costs, net | 7 | (1) | 8 |  | 7 |
| Total costs | 579 | 600 | 59 |  | 659 |
| Revenue adjustments, primarily for pricing on prior period open sales | (65) | (65) | — |  | (65) |
| Gross profit | $342 | $321 | $21 |  | $342 |
| Copper sales (millions of recoverable pounds) | 315 | 315 |  |  |  |
| Gross profit per pound of copper: |  |  |  |  |  |
| Revenues, excluding adjustments | $3.13 | $3.13 |  |  |  |
| Site production and delivery, before net noncash |  |  |  |  |  |
| and other costs shown below | 1.62 | 1.50 |  |  |  |
| By-product credits | (0.24) | — |  |  |  |
| Treatment charges | 0.16 | 0.16 |  |  |  |
| Unit net cash costs | 1.54 | 1.66 |  |  |  |
| Depreciation, depletion and amortization | 0.27 | 0.25 |  |  |  |
| Noncash and other costs, net | 0.02 | (0.01) |  |  |  |
| Total unit costs | 1.83 | 1.90 |  |  |  |
| Revenue adjustments, primarily for pricing |  |  |  |  |  |
| on prior period open sales | (0.21) | (0.21) |  |  |  |
| Gross profit per pound | $1.09 | $1.02 |  |  |  |
| Reconciliation to Amounts Reported |  |  |  |  |  |
| (In millions) | Revenues | Production and Delivery | Depreciation, Depletion and Amortization |  |  |
| Totals presented above | $1,066 | $517 | $86 |  |  |
| Treatment charges | (49) | — | — |  |  |
| Net noncash and other costs | — | 7 | — |  |  |
| Revenue adjustments, primarily for pricing on prior period open sales | (65) | — | — |  |  |
| Eliminations and other | (1) | (8) | — |  |  |
| South America mining | 951 | 516 | 86 |  |  |
| Other mining & eliminationsb | 3,000 | 2,243 | 272 |  |  |
| Total mining | 3,951 | 2,759 | 358 |  |  |
| Oil & Gas operations | 336 | 89 | 169 |  |  |
| Corporate, other & eliminations | 1 | 5 | 3 |  |  |
| As reported in FCX’s consolidated financial statements | $4,288 | $2,853 | $530 |  |  |

a. Includes gold sales of 21 thousand ounces ($1,317 per ounce average realized price) and silver sales of 809 thousand ounces ($20.40 per ounce average realized price). Also reflects sales of molybdenum produced by Cerro Verde to our molybdenum sales company at market-based pricing.

b. Represents the combined total for all other mining operations and the related eliminations, as presented in Note 13.

### South America Mining Product Revenues and Production Costs (continued)

*(In millions)*

| Three Months Ended June 30, 2012 | By-Product Method | Co-Product Method Copper | Other |  | Total |
| --- | ---: | ---: | ---: | --- | ---: |
| Revenues, excluding adjustments | $1,057 | $1,057 | $75 | a | $1,132 |
| Site production and delivery, before net noncash and other costs shown below | 469 | 438 | 37 |  | 475 |
| By-product credits | (69) | — | — |  | — |
| Treatment charges | 47 | 47 | — |  | 47 |
| Net cash costs | 447 | 485 | 37 |  | 522 |
| Depreciation, depletion and amortization | 71 | 68 | 3 |  | 71 |
| Noncash and other costs, net | 22 | 14 | 8 |  | 22 |
| Total costs | 540 | 567 | 48 |  | 615 |
| Revenue adjustments, primarily for pricing on prior period open sales | (68) | (68) | — |  | (68) |
| Gross profit | $449 | $422 | $27 |  | $449 |
| Copper sales (millions of recoverable pounds) | 301 | 301 |  |  |  |
| Gross profit per pound of copper: |  |  |  |  |  |
| Revenues, excluding adjustments | $3.51 | $3.51 |  |  |  |
| Site production and delivery, before net noncash |  |  |  |  |  |
| and other costs shown below | 1.56 | 1.45 |  |  |  |
| By-product credits | (0.23) | — |  |  |  |
| Treatment charges | 0.16 | 0.16 |  |  |  |
| Unit net cash costs | 1.49 | 1.61 |  |  |  |
| Depreciation, depletion and amortization | 0.24 | 0.23 |  |  |  |
| Noncash and other costs, net | 0.07 | 0.05 |  |  |  |
| Total unit costs | 1.80 | 1.89 |  |  |  |
| Revenue adjustments, primarily for pricing |  |  |  |  |  |
| on prior period open sales | (0.22) | (0.22) |  |  |  |
| Gross profit per pound | $1.49 | $1.40 |  |  |  |
| Reconciliation to Amounts Reported |  |  |  |  |  |
| (In millions) | Revenues | Production and Delivery | Depreciation, Depletion and Amortization |  |  |
| Totals presented above | $1,132 | $475 | $71 |  |  |
| Treatment charges | (47) | — | — |  |  |
| Net noncash and other costs | — | 22 | — |  |  |
| Revenue adjustments, primarily for pricing on prior period open sales | (68) | — | — |  |  |
| Eliminations and other | (1) | (7) | 1 |  |  |
| South America mining | 1,016 | 490 | 72 |  |  |
| Other mining & eliminationsb | 3,457 | 2,131 | 217 |  |  |
| Total mining | 4,473 | 2,621 | 289 |  |  |
| Oil & Gas operations | — | — | — |  |  |
| Corporate, other & eliminations | 2 | 1 | 2 |  |  |
| As reported in FCX’s consolidated financial statements | $4,475 | $2,622 | $291 |  |  |

a. Includes gold sales of 16 thousand ounces ($1,596 per ounce average realized price) and silver sales of 712 thousand ounces ($28.36 per ounce average realized price). Also reflects sales of molybdenum produced by Cerro Verde to our molybdenum sales company at market-based pricing.

b. Represents the combined total for all other mining operations and the related eliminations, as presented in Note 13.

### South America Mining Product Revenues and Production Costs (continued)

*(In millions)*

| Six Months Ended June 30, 2013 | By-Product Method | Co-Product Method Copper | Other |  | Total |
| --- | ---: | ---: | ---: | --- | ---: |
| Revenues, excluding adjustments | $1,929 | $1,929 | $166 | a | $2,095 |
| Site production and delivery, before net noncash and other costs shown below | 973 | 897 | 86 |  | 983 |
| By-product credits | (156) | — | — |  | — |
| Treatment charges | 99 | 99 | — |  | 99 |
| Net cash costs | 916 | 996 | 86 |  | 1,082 |
| Depreciation, depletion and amortization | 156 | 147 | 9 |  | 156 |
| Noncash and other costs, net | 22 | 6 | 16 |  | 22 |
| Total costs | 1,094 | 1,149 | 111 |  | 1,260 |
| Revenue adjustments, primarily for pricing on prior period open sales | (29) | (29) | — |  | (29) |
| Gross profit | $806 | $751 | $55 |  | $806 |
| Copper sales (millions of recoverable pounds) | 600 | 600 |  |  |  |
| Gross profit per pound of copper: |  |  |  |  |  |
| Revenues, excluding adjustments | $3.22 | $3.22 |  |  |  |
| Site production and delivery, before net noncash |  |  |  |  |  |
| and other costs shown below | 1.62 | 1.50 |  |  |  |
| By-product credits | (0.26) | 0.16 |  |  |  |
| Treatment charges | 0.17 | — |  |  |  |
| Unit net cash costs | 1.53 | 1.66 |  |  |  |
| Depreciation, depletion and amortization | 0.26 | 0.25 |  |  |  |
| Noncash and other costs, net | 0.04 | 0.01 |  |  |  |
| Total unit costs | 1.83 | 1.92 |  |  |  |
| Revenue adjustments, primarily for pricing |  |  |  |  |  |
| on prior period open sales | (0.05) | (0.05) |  |  |  |
| Gross profit per pound | $1.34 | $1.25 |  |  |  |
| Reconciliation to Amounts Reported |  |  |  |  |  |
| (In millions) | Revenues | Production and Delivery | Depreciation, Depletion and Amortization |  |  |
| Totals presented above | $2,095 | $983 | $156 |  |  |
| Treatment charges | (99) | — | — |  |  |
| Net noncash and other costs | — | 22 | — |  |  |
| Revenue adjustments, primarily for pricing on prior period open sales | (29) | — | — |  |  |
| Eliminations and other | (2) | (14) | 1 |  |  |
| South America mining | 1,965 | 991 | 157 |  |  |
| Other mining & eliminationsb | 6,567 | 4,484 | 528 |  |  |
| Total mining | 8,532 | 5,475 | 685 |  |  |
| Oil & Gas operations | 336 | 89 | 169 |  |  |
| Corporate, other & eliminations | 3 | 8 | 5 |  |  |
| As reported in FCX’s consolidated financial statements | $8,871 | $5,572 | $859 |  |  |

a. Includes gold sales of 42 thousand ounces ($1,449 per ounce average realized price) and silver sales of 1.8 million ounces ($25.93 per ounce average realized price). Also reflects sales of molybdenum produced by Cerro Verde to our molybdenum sales company at market-based pricing.

b. Represents the combined total for all other mining operations and the related eliminations, as presented in Note 13.

### South America Mining Product Revenues and Production Costs (continued)

*(In millions)*

| Six Months Ended June 30, 2012 | By-Product Method | Co-Product Method Copper | Other |  | Total |
| --- | ---: | ---: | ---: | --- | ---: |
| Revenues, excluding adjustments | $2,094 | $2,094 | $164 | a | $2,258 |
| Site production and delivery, before net noncash and other costs shown below | 908 | 842 | 77 |  | 919 |
| By-product credits | (153) | — | — |  | — |
| Treatment charges | 95 | 95 | — |  | 95 |
| Net cash costs | 850 | 937 | 77 |  | 1,014 |
| Depreciation, depletion and amortization | 134 | 127 | 7 |  | 134 |
| Noncash and other costs, net | 42 | 27 | 15 |  | 42 |
| Total costs | 1,026 | 1,091 | 99 |  | 1,190 |
| Revenue adjustments, primarily for pricing on prior period open sales | 104 | 104 | — |  | 104 |
| Gross profit | $1,172 | $1,107 | $65 |  | $1,172 |
| Copper sales (millions of recoverable pounds) | 587 | 587 |  |  |  |
| Gross profit per pound of copper: |  |  |  |  |  |
| Revenues, excluding adjustments | $3.56 | $3.56 |  |  |  |
| Site production and delivery, before net noncash |  |  |  |  |  |
| and other costs shown below | 1.55 | 1.43 |  |  |  |
| By-product credits | (0.26) | — |  |  |  |
| Treatment charges | 0.16 | 0.16 |  |  |  |
| Unit net cash costs | 1.45 | 1.59 |  |  |  |
| Depreciation, depletion and amortization | 0.22 | 0.22 |  |  |  |
| Noncash and other costs, net | 0.07 | 0.05 |  |  |  |
| Total unit costs | 1.74 | 1.86 |  |  |  |
| Revenue adjustments, primarily for pricing |  |  |  |  |  |
| on prior period open sales | 0.18 | 0.18 |  |  |  |
| Gross profit per pound | $2.00 | $1.88 |  |  |  |
| Reconciliation to Amounts Reported |  |  |  |  |  |
| (In millions) | Revenues | Production and Delivery | Depreciation, Depletion and Amortization |  |  |
| Totals presented above | $2,258 | $919 | $134 |  |  |
| Treatment charges | (95) | — | — |  |  |
| Net noncash and other costs | — | 42 | — |  |  |
| Revenue adjustments, primarily for pricing on prior period open sales | 104 | — | — |  |  |
| Eliminations and other | 3 | (8) | — |  |  |
| South America mining | 2,270 | 953 | 134 |  |  |
| Other mining & eliminationsb | 6,806 | 4,097 | 420 |  |  |
| Total mining | 9,076 | 5,050 | 554 |  |  |
| Oil & Gas operations | — | — | — |  |  |
| Corporate, other & eliminations | 4 | — | 4 |  |  |
| As reported in FCX’s consolidated financial statements | $9,080 | $5,050 | $558 |  |  |

a. Includes gold sales of 35 thousand ounces ($1,630 per ounce average realized price) and silver sales of 1.4 million ounces ($29.33 per ounce average realized price). Also reflects sales of molybdenum produced by Cerro Verde to our molybdenum sales company at market-based pricing.

b. Represents the combined total for all other mining operations and the related eliminations, as presented in Note 13.

### Indonesia Mining Product Revenues and Production Costs

*(In millions)*

| Three Months Ended June 30, 2013 | By-Product Method | Co-Product Method Copper | Gold | Silver |  | Total |
| --- | ---: | ---: | ---: | ---: | --- | ---: |
| Revenues, excluding adjustments | $487 | $487 | $199 | $9 | a | $695 |
| Site production and delivery, before net noncash and other costs shown below | 561 | 393 | 161 | 7 |  | 561 |
| Gold and silver credits | (190) | — | — | — |  | — |
| Treatment charges | 36 | 25 | 10 | 1 |  | 36 |
| Royalty on metals | 21 | 15 | 6 | — |  | 21 |
| Net cash costs | 428 | 433 | 177 | 8 |  | 618 |
| Depreciation and amortization | 58 | 41 | 16 | 1 |  | 58 |
| Noncash and other costs, net | 35 | 25 | 10 | — |  | 35 |
| Total costs | 521 | 499 | 203 | 9 |  | 711 |
| Revenue adjustments, primarily for pricing on prior period open sales | (29) | (29) | (17) | (1) |  | (47) |
| PT Smelting intercompany profit | 33 | 23 | 10 | — |  | 33 |
| Gross loss | $(30) | $(18) | $(11) | $(1) |  | $(30) |
| Copper sales (millions of recoverable pounds) | 158 | 158 |  |  |  |  |
| Gold sales (thousands of recoverable ounces) |  |  | 151 |  |  |  |
| Gross profit per pound of copper/per ounce of gold: |  |  |  |  |  |  |
| Revenues, excluding adjustments | $3.08 | $3.08 | $1,321 |  |  |  |
| Site production and delivery, before net noncash |  |  |  |  |  |  |
| and other costs shown below | 3.55 | 2.49 | 1,066 |  |  |  |
| Gold and silver credits | (1.20) | — | — |  |  |  |
| Treatment charges | 0.23 | 0.16 | 69 |  |  |  |
| Royalty on metals | 0.13 | 0.09 | 39 |  |  |  |
| Unit net cash costs | 2.71 | 2.74 | 1,174 |  |  |  |
| Depreciation and amortization | 0.37 | 0.26 | 111 |  |  |  |
| Noncash and other costs, net | 0.22 | 0.15 | 67 |  |  |  |
| Total unit costs | 3.30 | 3.15 | 1,352 |  |  |  |
| Revenue adjustments, primarily for pricing on |  |  |  |  |  |  |
| prior period open sales | (0.18) | (0.18) | (110) |  |  |  |
| PT Smelting intercompany profit | 0.21 | 0.14 | 62 |  |  |  |
| Gross loss per pound/ounce | $(0.19) | $(0.11) | $(79) |  |  |  |
| Reconciliation to Amounts Reported |  |  |  |  |  |  |
| (In millions) | Revenues | Production and Delivery | Depreciation, Depletion and Amortization |  |  |  |
| Totals presented above | $695 | $561 | $58 |  |  |  |
| Treatment charges | (36) | — | — |  |  |  |
| Royalty on metals | (21) | — | — |  |  |  |
| Net noncash and other costs | — | 35 | — |  |  |  |
| Revenue adjustments, primarily for pricing on prior period open sales | (47) | — | — |  |  |  |
| PT Smelting intercompany profit | — | (33) | — |  |  |  |
| Indonesia mining | 591 | 563 | 58 |  |  |  |
| Other mining & eliminationsb | 3,360 | 2,196 | 300 |  |  |  |
| Total mining | 3,951 | 2,759 | 358 |  |  |  |
| Oil & Gas operations | 336 | 89 | 169 |  |  |  |
| Corporate, other & eliminations | 1 | 5 | 3 |  |  |  |
| As reported in FCX’s consolidated financial statements | $4,288 | $2,853 | $530 |  |  |  |

a. Includes silver sales of 452 thousand ounces ($20.04 per ounce average realized price).

b. Represents the combined total for all other mining operations and the related eliminations, as presented in Note 13.

### Indonesia Mining Product Revenues and Production Costs (continued)

*(In millions)*

| Three Months Ended June 30, 2012 | By-Product Method | Co-Product Method Copper | Gold | Silver |  | Total |
| --- | ---: | ---: | ---: | ---: | --- | ---: |
| Revenues, excluding adjustments | $637 | $637 | $391 | $13 | a | $1,041 |
| Site production and delivery, before net noncash and other costs shown below | 589 | 361 | 221 | 7 |  | 589 |
| Gold and silver credits | (402) | — | — | — |  | — |
| Treatment charges | 38 | 23 | 14 | 1 |  | 38 |
| Royalty on metals | 25 | 15 | 10 | — |  | 25 |
| Net cash costs | 250 | 399 | 245 | 8 |  | 652 |
| Depreciation and amortization | 53 | 32 | 20 | 1 |  | 53 |
| Noncash and other costs, net | 5 | 3 | 2 | — |  | 5 |
| Total costs | 308 | 434 | 267 | 9 |  | 710 |
| Revenue adjustments, primarily for pricing on prior period open sales | (20) | (20) | (2) | — |  | (22) |
| PT Smelting intercompany profit | 8 | 5 | 3 | — |  | 8 |
| Gross profit | $317 | $188 | $125 | $4 |  | $317 |
| Copper sales (millions of recoverable pounds) | 183 | 183 |  |  |  |  |
| Gold sales (thousands of recoverable ounces) |  |  | 247 |  |  |  |
| Gross profit per pound of copper/per ounce of gold: |  |  |  |  |  |  |
| Revenues, excluding adjustments | $3.49 | $3.49 | $1,587 |  |  |  |
| Site production and delivery, before net noncash |  |  |  |  |  |  |
| and other costs shown below | 3.23 | 1.97 | 898 |  |  |  |
| Gold and silver credits | (2.20) | — | — |  |  |  |
| Treatment charges | 0.21 | 0.13 | 58 |  |  |  |
| Royalty on metals | 0.13 | 0.08 | 37 |  |  |  |
| Unit net cash costs | 1.37 | 2.18 | 993 |  |  |  |
| Depreciation and amortization | 0.29 | 0.18 | 80 |  |  |  |
| Noncash and other costs, net | 0.03 | 0.02 | 8 |  |  |  |
| Total unit costs | 1.69 | 2.38 | 1,081 |  |  |  |
| Revenue adjustments, primarily for pricing on |  |  |  |  |  |  |
| prior period open sales | (0.11) | (0.11) | (9) |  |  |  |
| PT Smelting intercompany profit | 0.05 | 0.03 | 13 |  |  |  |
| Gross profit per pound/ounce | $1.74 | $1.03 | $510 |  |  |  |
| Reconciliation to Amounts Reported |  |  |  |  |  |  |
| (In millions) | Revenues | Production and Delivery | Depreciation, Depletion and Amortization |  |  |  |
| Totals presented above | $1,041 | $589 | $53 |  |  |  |
| Treatment charges | (38) | — | — |  |  |  |
| Royalty on metals | (25) | — | — |  |  |  |
| Net noncash and other costs | — | 5 | — |  |  |  |
| Revenue adjustments, primarily for pricing on prior period open sales | (22) | — | — |  |  |  |
| PT Smelting intercompany profit | — | (8) | — |  |  |  |
| Indonesia mining | 956 | 586 | 53 |  |  |  |
| Other mining & eliminationsb | 3,517 | 2,035 | 236 |  |  |  |
| Total mining | 4,473 | 2,621 | 289 |  |  |  |
| Oil & Gas operations | — | — | — |  |  |  |
| Corporate, other & eliminations | 2 | 1 | 2 |  |  |  |
| As reported in FCX’s consolidated financial statements | $4,475 | $2,622 | $291 |  |  |  |

a. Includes silver sales of 476 thousand ounces ($27.23 per ounce average realized price).

b. Represents the combined total for all other mining operations and the related eliminations, as presented in Note 13.

### Indonesia Mining Product Revenues and Production Costs (continued)

*(In millions)*

| Six Months Ended June 30, 2013 | By-Product Method | Co-Product Method Copper | Gold | Silver |  | Total |
| --- | ---: | ---: | ---: | ---: | --- | ---: |
| Revenues, excluding adjustments | $1,137 | $1,137 | $490 | $24 | a | $1,651 |
| Site production and delivery, before net noncash and other costs shown below | 1,077 | 742 | 319 | 16 |  | 1,077 |
| Gold and silver credits | (512) | — | — | — |  | — |
| Treatment charges | 81 | 56 | 24 | 1 |  | 81 |
| Royalty on metals | 47 | 33 | 14 | — |  | 47 |
| Net cash costs | 693 | 831 | 357 | 17 |  | 1,205 |
| Depreciation and amortization | 113 | 78 | 33 | 2 |  | 113 |
| Noncash and other costs, net | 87 | 60 | 26 | 1 |  | 87 |
| Total costs | 893 | 969 | 416 | 20 |  | 1,405 |
| Revenue adjustments, primarily for pricing on prior period open sales | 1 | 1 | (2) | — |  | (1) |
| PT Smelting intercompany profit | 38 | 26 | 11 | 1 |  | 38 |
| Gross profit | $283 | $195 | $83 | $5 |  | $283 |
| Copper sales (millions of recoverable pounds) | 356 | 356 |  |  |  |  |
| Gold sales (thousands of recoverable ounces) |  |  | 342 |  |  |  |
| Gross profit per pound of copper/per ounce of gold: |  |  |  |  |  |  |
| Revenues, excluding adjustments | $3.20 | $3.20 | $1,431 |  |  |  |
| Site production and delivery, before net noncash |  |  |  |  |  |  |
| and other costs shown below | 3.03 | 2.08 | 934 |  |  |  |
| Gold and silver credits | (1.44) | — | — |  |  |  |
| Treatment charges | 0.23 | 0.16 | 70 |  |  |  |
| Royalty on metals | 0.13 | 0.09 | 41 |  |  |  |
| Unit net cash costs | 1.95 | 2.33 | 1,045 |  |  |  |
| Depreciation and amortization | 0.32 | 0.22 | 98 |  |  |  |
| Noncash and other costs, net | 0.24 | 0.17 | 76 |  |  |  |
| Total unit costs | 2.51 | 2.72 | 1,219 |  |  |  |
| Revenue adjustments, primarily for pricing on |  |  |  |  |  |  |
| prior period open sales | — | — | (4) |  |  |  |
| PT Smelting intercompany profit | 0.10 | 0.07 | 33 |  |  |  |
| Gross profit per pound/ounce | $0.79 | $0.55 | $241 |  |  |  |
| Reconciliation to Amounts Reported |  |  |  |  |  |  |
| (In millions) | Revenues | Production and Delivery | Depreciation, Depletion and Amortization |  |  |  |
| Totals presented above | $1,651 | $1,077 | $113 |  |  |  |
| Treatment charges | (81) | — | — |  |  |  |
| Royalty on metals | (47) | — | — |  |  |  |
| Net noncash and other costs | — | 87 | — |  |  |  |
| Revenue adjustments, primarily for pricing on prior period open sales | (1) | — | — |  |  |  |
| PT Smelting intercompany profit | — | (38) | — |  |  |  |
| Indonesia mining | 1,522 | 1,126 | 113 |  |  |  |
| Other mining & eliminationsb | 7,010 | 4,349 | 572 |  |  |  |
| Total mining | 8,532 | 5,475 | 685 |  |  |  |
| Oil & Gas operations | 336 | 89 | 169 |  |  |  |
| Corporate, other & eliminations | 3 | 8 | 5 |  |  |  |
| As reported in FCX’s consolidated financial statements | $8,871 | $5,572 | $859 |  |  |  |

a. Includes silver sales of 1.0 million ounces ($23.19 per ounce average realized price).

b. Represents the combined total for all other mining operations and the related eliminations, as presented in Note 13.

### Indonesia Mining Product Revenues and Production Costs (continued)

*(In millions)*

| Six Months Ended June 30, 2012 | By-Product Method | Co-Product Method Copper | Gold | Silver |  | Total |
| --- | ---: | ---: | ---: | ---: | --- | ---: |
| Revenues, excluding adjustments | $1,128 | $1,128 | $841 | $27 | a | $1,996 |
| Site production and delivery, before net noncash and other costs shown below | 1,059 | 598 | 446 | 15 |  | 1,059 |
| Gold and silver credits | (871) | — | — | — |  | — |
| Treatment charges | 63 | 36 | 26 | 1 |  | 63 |
| Royalty on metals | 43 | 24 | 18 | 1 |  | 43 |
| Net cash costs | 294 | 658 | 490 | 17 |  | 1,165 |
| Depreciation and amortization | 99 | 56 | 42 | 1 |  | 99 |
| Noncash and other costs, net | 30 | 17 | 13 | — |  | 30 |
| Total costs | 423 | 731 | 545 | 18 |  | 1,294 |
| Revenue adjustments, primarily for pricing on prior period open sales | 13 | 13 | 3 | — |  | 16 |
| PT Smelting intercompany loss | (12) | (7) | (5) | — |  | (12) |
| Gross profit | $706 | $403 | $294 | $9 |  | $706 |
| Copper sales (millions of recoverable pounds) | 317 | 317 |  |  |  |  |
| Gold sales (thousands of recoverable ounces) |  |  | 513 |  |  |  |
| Gross profit per pound of copper/per ounce of gold: |  |  |  |  |  |  |
| Revenues, excluding adjustments | $3.56 | $3.56 | $1,639 |  |  |  |
| Site production and delivery, before net noncash |  |  |  |  |  |  |
| and other costs shown below | 3.35 | 1.89 | 869 |  |  |  |
| Gold and silver credits | (2.75) | — | — |  |  |  |
| Treatment charges | 0.20 | 0.11 | 52 |  |  |  |
| Royalty on metals | 0.13 | 0.08 | 35 |  |  |  |
| Unit net cash costs | 0.93 | 2.08 | 956 |  |  |  |
| Depreciation and amortization | 0.31 | 0.18 | 81 |  |  |  |
| Noncash and other costs, net | 0.09 | 0.05 | 25 |  |  |  |
| Total unit costs | 1.33 | 2.31 | 1,062 |  |  |  |
| Revenue adjustments, primarily for pricing on |  |  |  |  |  |  |
| prior period open sales | 0.04 | 0.04 | 5 |  |  |  |
| PT Smelting intercompany loss | (0.04) | (0.02) | (10) |  |  |  |
| Gross profit per pound/ounce | $2.23 | $1.27 | $572 |  |  |  |
| Reconciliation to Amounts Reported |  |  |  |  |  |  |
| (In millions) | Revenues | Production and Delivery | Depreciation, Depletion and Amortization |  |  |  |
| Totals presented above | $1,996 | $1,059 | $99 |  |  |  |
| Treatment charges | (63) | — | — |  |  |  |
| Royalty on metals | (43) | — | — |  |  |  |
| Net noncash and other costs | — | 30 | — |  |  |  |
| Revenue adjustments, primarily for pricing on prior period open sales | 16 | — | — |  |  |  |
| PT Smelting intercompany loss | — | 12 | — |  |  |  |
| Indonesia mining | 1,906 | 1,101 | 99 |  |  |  |
| Other mining & eliminationsb | 7,170 | 3,949 | 455 |  |  |  |
| Total mining | 9,076 | 5,050 | 554 |  |  |  |
| Oil & Gas operations | — | — | — |  |  |  |
| Corporate, other & eliminations | 4 | — | 4 |  |  |  |
| As reported in FCX’s consolidated financial statements | $9,080 | $5,050 | $558 |  |  |  |

a. Includes silver sales of 925 thousand ounces ($29.84 per ounce average realized price).

b. Represents the combined total for all other mining operations and the related eliminations, as presented in Note 13.

### Africa Mining Product Revenues and Production Costs

*(In millions)*

| Three Months Ended June 30, 2013 | By-Product Method | Co-Product Method Copper | Cobalt | Total |
| --- | ---: | ---: | ---: | ---: |
| Revenues, excluding adjustmentsa | $330 | $330 | $47 | $377 |
| Site production and delivery, before net noncash and other costs shown below | 156 | 146 | 27 | 173 |
| Cobalt creditsb | (31) | — | — | — |
| Royalty on metals | 6 | 5 | 1 | 6 |
| Net cash costs | 131 | 151 | 28 | 179 |
| Depreciation, depletion and amortization | 57 | 52 | 5 | 57 |
| Noncash and other costs, net | 12 | 11 | 1 | 12 |
| Total costs | 200 | 214 | 34 | 248 |
| Revenue adjustments, primarily for pricing on prior period open sales | (7) | (8) | 2 | (6) |
| Gross profit | $123 | $108 | $15 | $123 |
| Copper sales (millions of recoverable pounds) | 106 | 106 |  |  |
| Cobalt sales (millions of contained pounds) |  |  | 5 |  |
| Gross profit per pound of copper/cobalt: |  |  |  |  |
| Revenues, excluding adjustmentsa | $3.10 | $3.10 | $8.48 |  |
| Site production and delivery, before net noncash |  |  |  |  |
| and other costs shown below | 1.47 | 1.37 | 4.92 |  |
| Cobalt creditsb | (0.30) | — | — |  |
| Royalty on metals | 0.06 | 0.05 | 0.15 |  |
| Unit net cash costs | 1.23 | 1.42 | 5.07 |  |
| Depreciation, depletion and amortization | 0.53 | 0.49 | 0.80 |  |
| Noncash and other costs, net | 0.11 | 0.10 | 0.17 |  |
| Total unit costs | 1.87 | 2.01 | 6.04 |  |
| Revenue adjustments, primarily for pricing |  |  |  |  |
| on prior period open sales | (0.07) | (0.07) | 0.27 |  |
| Gross profit per pound | $1.16 | $1.02 | $2.71 |  |
| Reconciliation to Amounts Reported |  |  |  |  |
| (In millions) | Revenues | Production and Delivery | Depreciation, Depletion and Amortization |  |
| Totals presented above | $377 | $173 | $57 |  |
| Royalty on metals | (6) | — | — |  |
| Net noncash and other costs | — | 12 | — |  |
| Revenue adjustments, primarily for pricing on prior period open sales | (6) | — | — |  |
| Africa mining | 365 | 185 | 57 |  |
| Other mining & eliminationsc | 3,586 | 2,574 | 301 |  |
| Total mining | 3,951 | 2,759 | 358 |  |
| Oil & Gas operations | 336 | 89 | 169 |  |
| Corporate, other & eliminations | 1 | 5 | 3 |  |
| As reported in FCX’s consolidated financial statements | $4,288 | $2,853 | $530 |  |

a. Includes point-of-sale transportation costs as negotiated in customer contracts.

c. Represents the combined total for all other mining operations and the related eliminations, as presented in Note 13.

### Africa Mining Product Revenues and Production Costs (continued)

*(In millions)*

| Three Months Ended June 30, 2012 | By-Product Method | Co-Product Method Copper | Cobalt | Total |
| --- | ---: | ---: | ---: | ---: |
| Revenues, excluding adjustmentsa | $284 | $284 | $49 | $333 |
| Site production and delivery, before net noncash and other costs shown below | 121 | 114 | 30 | 144 |
| Cobalt creditsb | (27) | — | — | — |
| Royalty on metals | 6 | 5 | 1 | 6 |
| Net cash costs | 100 | 119 | 31 | 150 |
| Depreciation, depletion and amortization | 40 | 35 | 5 | 40 |
| Noncash and other costs, net | 8 | 7 | 1 | 8 |
| Total costs | 148 | 161 | 37 | 198 |
| Revenue adjustments, primarily for pricing on prior period open sales | (6) | (6) | 1 | (5) |
| Gross profit | $130 | $117 | $13 | $130 |
| Copper sales (millions of recoverable pounds) | 82 | 82 |  |  |
| Cobalt sales (millions of contained pounds) |  |  | 6 |  |
| Gross profit per pound of copper/cobalt: |  |  |  |  |
| Revenues, excluding adjustmentsa | $3.45 | $3.45 | $8.24 |  |
| Site production and delivery, before net noncash |  |  |  |  |
| and other costs shown below | 1.48 | 1.39 | 5.09 |  |
| Cobalt creditsb | (0.33) | — | — |  |
| Royalty on metals | 0.07 | 0.06 | 0.13 |  |
| Unit net cash costs | 1.22 | 1.45 | 5.22 |  |
| Depreciation, depletion and amortization | 0.49 | 0.43 | 0.75 |  |
| Noncash and other costs, net | 0.09 | 0.08 | 0.14 |  |
| Total unit costs | 1.80 | 1.96 | 6.11 |  |
| Revenue adjustments, primarily for pricing |  |  |  |  |
| on prior period open sales | (0.07) | (0.07) | 0.12 |  |
| Gross profit per pound | $1.58 | $1.42 | $2.25 |  |
| Reconciliation to Amounts Reported |  |  |  |  |
| (In millions) | Revenues | Production and Delivery | Depreciation, Depletion and Amortization |  |
| Totals presented above | $333 | $144 | $40 |  |
| Royalty on metals | (6) | — | — |  |
| Net noncash and other costs | — | 8 | — |  |
| Revenue adjustments, primarily for pricing on prior period open sales | (5) | — | — |  |
| Africa mining | 322 | 152 | 40 |  |
| Other mining & eliminationsc | 4,151 | 2,469 | 249 |  |
| Total mining | 4,473 | 2,621 | 289 |  |
| Oil & Gas operations | — | — | — |  |
| Corporate, other & eliminations | 2 | 1 | 2 |  |
| As reported in FCX’s consolidated financial statements | $4,475 | $2,622 | $291 |  |

a. Includes point-of-sale transportation costs as negotiated in customer contracts.

c. Represents the combined total for all other mining operations and the related eliminations, as presented in Note 13.

### Africa Mining Product Revenues and Production Costs (continued)

*(In millions)*

| Six Months Ended June 30, 2013 | By-Product Method | Co-Product Method Copper | Cobalt | Total |
| --- | ---: | ---: | ---: | ---: |
| Revenues, excluding adjustmentsa | $724 | $724 | $89 | $813 |
| Site production and delivery, before net noncash and other costs shown below | 321 | 303 | 51 | 354 |
| Cobalt creditsb | (58) | — | — | — |
| Royalty on metals | 14 | 13 | 1 | 14 |
| Net cash costs | 277 | 316 | 52 | 368 |
| Depreciation, depletion and amortization | 115 | 107 | 8 | 115 |
| Noncash and other costs, net | 16 | 15 | 1 | 16 |
| Total costs | 408 | 438 | 61 | 499 |
| Revenue adjustments, primarily for pricing on prior period open sales | 2 | 2 | 2 | 4 |
| Gross profit | $318 | $288 | $30 | $318 |
| Copper sales (millions of recoverable pounds) | 224 | 224 |  |  |
| Cobalt sales (millions of contained pounds) |  |  | 11 |  |
| Gross profit per pound of copper/cobalt: |  |  |  |  |
| Revenues, excluding adjustmentsa | $3.22 | $3.22 | $7.99 |  |
| Site production and delivery, before net noncash |  |  |  |  |
| and other costs shown below | 1.43 | 1.35 | 4.54 |  |
| Cobalt creditsb | (0.26) | — | — |  |
| Royalty on metals | 0.06 | 0.06 | 0.14 |  |
| Unit net cash costs | 1.23 | 1.41 | 4.68 |  |
| Depreciation, depletion and amortization | 0.51 | 0.47 | 0.75 |  |
| Noncash and other costs, net | 0.08 | 0.07 | 0.11 |  |
| Total unit costs | 1.82 | 1.95 | 5.54 |  |
| Revenue adjustments, primarily for pricing |  |  |  |  |
| on prior period open sales | 0.01 | 0.01 | 0.21 |  |
| Gross profit per pound | $1.41 | $1.28 | $2.66 |  |
| Reconciliation to Amounts Reported |  |  |  |  |
| (In millions) | Revenues | Production and Delivery | Depreciation, Depletion and Amortization |  |
| Totals presented above | $813 | $354 | $115 |  |
| Royalty on metals | (14) | — | — |  |
| Net noncash and other costs | — | 16 | — |  |
| Revenue adjustments, primarily for pricing on prior period open sales | 4 | — | — |  |
| Africa mining | 803 | 370 | 115 |  |
| Other mining & eliminationsc | 7,729 | 5,105 | 570 |  |
| Total mining | 8,532 | 5,475 | 685 |  |
| Oil & Gas operations | 336 | 89 | 169 |  |
| Corporate, other & eliminations | 3 | 8 | 5 |  |
| As reported in FCX’s consolidated financial statements | $8,871 | $5,572 | $859 |  |

a. Includes point-of-sale transportation costs as negotiated in customer contracts.

c. Represents the combined total for all other mining operations and the related eliminations, as presented in Note 13.

### Africa Mining Product Revenues and Production Costs (continued)

*(In millions)*

| Six Months Ended June 30, 2012 | By-Product Method | Co-Product Method Copper | Cobalt | Total |
| --- | ---: | ---: | ---: | ---: |
| Revenues, excluding adjustmentsa | $536 | $536 | $92 | $628 |
| Site production and delivery, before net noncash and other costs shown below | 224 | 213 | 56 | 269 |
| Cobalt creditsb | (50) | — | — | — |
| Royalty on metals | 12 | 11 | 1 | 12 |
| Net cash costs | 186 | 224 | 57 | 281 |
| Depreciation, depletion and amortization | 72 | 64 | 8 | 72 |
| Noncash and other costs, net | 15 | 13 | 2 | 15 |
| Total costs | 273 | 301 | 67 | 368 |
| Revenue adjustments, primarily for pricing on prior period open sales | 8 | 8 | 3 | 11 |
| Gross profit | $271 | $243 | $28 | $271 |
| Copper sales (millions of recoverable pounds) | 151 | 151 |  |  |
| Cobalt sales (millions of contained pounds) |  |  | 11 |  |
| Gross profit per pound of copper/cobalt: |  |  |  |  |
| Revenues, excluding adjustmentsa | $3.54 | $3.54 | $8.40 |  |
| Site production and delivery, before net noncash |  |  |  |  |
| and other costs shown below | 1.49 | 1.41 | 5.11 |  |
| Cobalt creditsb | (0.34) | — | — |  |
| Royalty on metals | 0.08 | 0.07 | 0.13 |  |
| Unit net cash costs | 1.23 | 1.48 | 5.24 |  |
| Depreciation, depletion and amortization | 0.48 | 0.42 | 0.71 |  |
| Noncash and other costs, net | 0.10 | 0.09 | 0.14 |  |
| Total unit costs | 1.81 | 1.99 | 6.09 |  |
| Revenue adjustments, primarily for pricing |  |  |  |  |
| on prior period open sales | 0.06 | 0.06 | 0.22 |  |
| Gross profit per pound | $1.79 | $1.61 | $2.53 |  |
| Reconciliation to Amounts Reported |  |  |  |  |
| (In millions) | Revenues | Production and Delivery | Depreciation, Depletion and Amortization |  |
| Totals presented above | $628 | $269 | $72 |  |
| Royalty on metals | (12) | — | — |  |
| Net noncash and other costs | — | 15 | — |  |
| Revenue adjustments, primarily for pricing on prior period open sales | 11 | — | — |  |
| Africa mining | 627 | 284 | 72 |  |
| Other mining & eliminationsc | 8,449 | 4,766 | 482 |  |
| Total mining | 9,076 | 5,050 | 554 |  |
| Oil & Gas operations | — | — | — |  |
| Corporate, other & eliminations | 4 | — | 4 |  |
| As reported in FCX’s consolidated financial statements | $9,080 | $5,050 | $558 |  |

a. Includes point-of-sale transportation costs as negotiated in customer contracts.

c. Represents the combined total for all other mining operations and the related eliminations, as presented in Note 13.

### Molybdenum Mines Product Revenues and Production Costs

*(In millions)*

|  | Three Months Ended June 30, 2013a | 2012a |  |
| --- | ---: | ---: | ---: |
| Revenues, excluding adjustmentsb | $156 | $130 |  |
| Site production and delivery, before net noncash and other costs shown below | 76 | 51 |  |
| Treatment charges and other | 12 | 8 |  |
| Net cash costs | 88 | 59 |  |
| Depreciation, depletion and amortization | 21 | 8 |  |
| Noncash and other costs, net | 2 | 2 |  |
| Total costs | 111 | 69 |  |
| Gross profit | $45 | $61 |  |
| Molybdenum production (millions of recoverable pounds)b | 13 | 8 |  |
| Gross profit per pound of molybdenum: |  |  |  |
| Revenues, excluding adjustmentsb | $12.13 | $15.11 |  |
| Site production and delivery, before net noncash and other costs shown below | 5.84 | 5.95 |  |
| Treatment charges and other | 0.95 | 0.88 |  |
| Unit net cash costs | 6.79 | 6.83 |  |
| Depreciation, depletion and amortization | 1.65 | 0.95 |  |
| Noncash and other costs, net | 0.18 | 0.25 |  |
| Total unit costs | 8.62 | 8.03 |  |
| Gross profit per pound | $3.51 | $7.08 |  |
| Reconciliation to Amounts Reported (In millions) | Revenues | Production and Delivery | Depreciation, Depletion and Amortization |
| Three Months Ended June 30, 2013 |  |  |  |
| Totals presented above | $156 | $76 | $21 |
| Treatment charges and other | (12) | — | — |
| Net noncash and other costs | — | 2 | — |
| Molybdenum mines | 144 | 78 | 21 |
| Other mining & eliminationsc | 3,807 | 2,681 | 337 |
| Total mining | 3,951 | 2,759 | 358 |
| Oil & Gas operations | 336 | 89 | 169 |
| Corporate, other & eliminations | 1 | 5 | 3 |
| As reported in FCX’s consolidated financial statements | $4,288 | $2,853 | $530 |
| Three Months Ended June 30, 2012 |  |  |  |
| Totals presented above | $130 | $51 | $8 |
| Treatment charges and other | (8) | — | — |
| Net noncash and other costs | — | 2 | — |
| Henderson mine | 122 | 53 | 8 |
| Climax mine | 12 | 26 | 4 |
| Molybdenum mines | 134 | 79 | 12 |
| Other mining & eliminationsc | 4,339 | 2,542 | 277 |
| Total mining | 4,473 | 2,621 | 289 |
| Oil & Gas operations | — | — | — |
| Corporate, other & eliminations | 2 | 1 | 2 |
| As reported in FCX’s consolidated financial statements | $4,475 | $2,622 | $291 |

a. The 2013 period includes the results of the Henderson and Climax mines; the 2012 period reflects the results of only the Henderson mine as start up activities were still underway for the Climax mine.

b. Reflects sales of the molybdenum mines' production to our molybdenum sales company at market-based pricing. On a consolidated basis, realizations are based on the actual contract terms for sales to third-parties; as a result, our consolidated average realized price per pound of molybdenum will differ from the amounts reported in this table.

c. Represents the combined total for all other mining operations and the related eliminations, as presented in Note 13. Also includes amounts associated with our molybdenum sales company, which includes sales of molybdenum produced by the molybdenum mines and by certain of the North and South America copper mines.

### Molybdenum Mines Product Revenues and Production Costs (continued)

*(In millions)*

|  | Six Months Ended June 30, 2013a | 2012a |  |
| --- | ---: | ---: | ---: |
| Revenues, excluding adjustmentsb | $311 | $264 |  |
| Site production and delivery, before net noncash and other costs shown below | 154 | 105 |  |
| Treatment charges and other | 24 | 15 |  |
| Net cash costs | 178 | 120 |  |
| Depreciation, depletion and amortization | 41 | 16 |  |
| Noncash and other costs, net | 4 | 1 |  |
| Total costs | 223 | 137 |  |
| Gross profit | $88 | $127 |  |
| Molybdenum sales (millions of recoverable pounds)b | 25 | 17 |  |
| Gross profit per pound of molybdenum: |  |  |  |
| Revenues, excluding adjustmentsb | $12.33 | $15.07 |  |
| Site production and delivery, before net noncash and other costs shown below | 6.10 | 5.98 |  |
| Treatment charges and other | 0.95 | 0.87 |  |
| Unit net cash costs | 7.05 | 6.85 |  |
| Depreciation, depletion and amortization | 1.64 | 0.93 |  |
| Noncash and other costs, net | 0.16 | 0.06 |  |
| Total unit costs | 8.85 | 7.84 |  |
| Gross profit per pound | $3.48 | $7.23 |  |
| Reconciliation to Amounts Reported (In millions) | Revenues | Production and Delivery | Depreciation, Depletion and Amortization |
| Six Months Ended June 30, 2013 |  |  |  |
| Totals presented above | $311 | $154 | $41 |
| Treatment charges and other | (24) | — | — |
| Net noncash and other costs | — | 4 | — |
| Molybdenum mines | 287 | 158 | 41 |
| Other mining & eliminationsc | 8,245 | 5,317 | 644 |
| Total mining | 8,532 | 5,475 | 685 |
| Oil & Gas operations | 336 | 89 | 169 |
| Corporate, other & eliminations | 3 | 8 | 5 |
| As reported in FCX’s consolidated financial statements | $8,871 | $5,572 | $859 |
| Six Months Ended June 30, 2012 |  |  |  |
| Totals presented above | $264 | $105 | $16 |
| Treatment charges and other | (15) | — | — |
| Net noncash and other costs | — | 1 | — |
| Henderson mine | 249 | 106 | 16 |
| Climax mine | 11 | 43 | 7 |
| Molybdenum mines | 260 | 149 | 23 |
| Other mining & eliminationsc | 8,816 | 4,901 | 531 |
| Total mining | 9,076 | 5,050 | 554 |
| Oil & Gas operations | — | — | — |
| Corporate, other & eliminations | 4 | — | 4 |
| As reported in FCX’s consolidated financial statements | $9,080 | $5,050 | $558 |

a. The 2013 period includes the results of the Henderson and Climax mines; the 2012 period reflects the results of only the Henderson mine as start up activities were still underway for the Climax mine.

b. Reflects sales of the molybdenum mines' production to our molybdenum sales company at market-based pricing. On a consolidated basis, realizations are based on the actual contract terms for sales to third-parties; as a result, our consolidated average realized price per pound of molybdenum will differ from the amounts reported in this table.

c. Represents the combined total for all other mining operations and the related eliminations, as presented in Note 13. Also includes amounts associated with our molybdenum sales company, which includes sales of molybdenum produced by the molybdenum mines and by certain of the North and South America copper mines.

### Oil & Gas Product Revenues and Cash Production Costs and Realizations

*(In millions)*

| June 1, 2013, to June 30, 2013 | Oil | Natural Gas | NGLs | Total Oil & Gas |
| --- | ---: | ---: | ---: | ---: |
| Oil and gas revenues before derivatives | $330 | $30 | $11 | $371 |
| Realized gains on derivative instruments | 1 | — | — | 1 |
| Realized revenues | $331 | $30 | $11 | 372 |
| Less: cash production costs |  |  |  | 83 |
| Cash operating margin |  |  |  | 289 |
| Less: depreciation, depletion and amortization |  |  |  | 169 |
| Less: accretion and other costs |  |  |  | 6 |
| Unrealized losses on derivative instruments |  |  |  | (36) |
| Other net adjustments |  |  |  | — |
| Gross profit |  |  |  | $78 |
| Oil (MMBbls) | 3.4 |  |  |  |
| Gas (Bcf) |  | 7.7 |  |  |
| NGLs (MMBbls) |  |  | 0.3 |  |
| Oil Equivalents (MMBOE) |  |  |  | 5.0 |
|  | Oil (per barrel) | Natural Gas (per MMBtu) | NGLs (per barrel) | Per BOE |
| Oil and gas revenues before derivatives | $97.05 | $3.81 | $35.18 | $74.03 |
| Realized gains on derivative instruments | 0.37 | 0.05 | — | 0.34 |
| Realized revenues | $97.42 | $3.86 | $35.18 | 74.37 |
| Less: cash production costs |  |  |  | 16.58 |
| Cash operating margin |  |  |  | 57.79 |
| Less: depreciation, depletion and amortization |  |  |  | 33.82 |
| Less: accretion and other costs |  |  |  | 1.11 |
| Unrealized losses on derivative instruments |  |  |  | (7.27) |
| Other net adjustments |  |  |  | (0.02) |
| Gross profit |  |  |  | $15.57 |
| Reconciliation to Amounts Reported |  |  |  |  |
| (In millions) | Revenues | Production and Delivery | Depreciation, Depletion and Amortization |  |
| Revenues, before derivative instruments | $371 | $— | $— |  |
| Realized gains on derivative instruments | 1 | — | — |  |
| Unrealized losses on derivative instruments | (36) | — | — |  |
| Cash production costs | — | 83 | — |  |
| Accretion and other costs | — | 6 | — |  |
| Depreciation, depletion and amortization | — | — | 169 |  |
| Oil & Gas operations | 336 | 89 | 169 |  |
| Total mining | 3,951 | 2,759 | 358 |  |
| Corporate, other & eliminations | 1 | 5 | 3 |  |
| As reported in our consolidated financial statements | $4,288 | $2,853 | $530 |  |

88

### CAUTIONARY STATEMENT

Our discussion and analysis contains forward-looking statements in which we discuss factors we believe may affect our future performance. Forward-looking statements are all statements other than statements of historical facts, such as projections or expectations relating to ore grades and milling rates, production and sales volumes, unit net cash costs, operating cash flows, capital expenditures, exploration efforts and results, development and production activities and costs, liquidity, tax rates, the impact of copper, gold, molybdenum, cobalt, oil and gas price changes, the impact of derivative positions, the impact of deferred intercompany profits on earnings, reserve estimates, future dividend payments and potential share purchases. The words “anticipates,” “may,” “can,” “plans,” “believes,” “estimates,” “expects,” “projects,” “intends,” “likely,” “will,” “should,” “to be,” and any similar expressions are intended to identify those assertions as forward-looking statements. The declaration of dividends is at the discretion of the Board and will depend on our financial results, cash requirements, future prospects, and other factors deemed relevant by the Board.

We caution readers that forward-looking statements are not guarantees of future performance and our actual results may differ materially from those anticipated, projected or assumed in the forward-looking statements. Important factors that can cause our actual results to differ materially from those anticipated in the forward-looking statements include demand for, and prices of, copper, gold, molybdenum, cobalt, oil and gas, mine sequencing, production rates, drilling results, the outcome of ongoing discussions with the Indonesian government, the potential effects of violence in Indonesia, the resolution of administrative disputes in the Democratic Republic of Congo, labor relations, the ability to retain current or future lease acreage rights, unanticipated hazards for which we have limited or no insurance coverage, failure of third party partners to fulfill their capital and other commitments, adverse conditions that could lead to structural or mechanical failures or increased costs, changes in reserve estimates, currency translation risks, risks associated with the integration of recently acquired oil and gas operations, industry risks, regulatory changes, political risks, weather- and climate-related risks, environmental risks, litigation results, and other factors described in more detail under the heading “Risk Factors” in our annual report on Form 10-K for the year ended December 31, 2012, filed with the SEC as updated by our subsequent filings with the SEC.

Investors are cautioned that many of the assumptions on which our forward-looking statements are based are likely to change after our forward-looking statements are made, including for example commodity prices, which we cannot control, and production volumes and costs, some aspects of which we may or may not be able to control. Further, we may make changes to our business plans that could or will affect our results. We caution investors that we do not intend to update our forward-looking statements more frequently than quarterly notwithstanding any changes in our assumptions, changes in our business plans, our actual experience, or other changes, and we undertake no obligation to update any forward-looking statements.

## Market risk

As filed, 756 characters.

There have been no material changes in our market risks during the three-month period ended June 30, 2013. For additional information on market risks, refer to “Disclosures About Market Risks” included in Part I, Item 2. of this quarterly report on Form 10-Q for the period ended June 30, 2013. For projected sensitivities of our operating cash flow to changes in commodity prices, refer to “Outlook” in Part I, Item 2. of this quarterly report on Form 10-Q for the period ended June 30, 2013; for projected sensitivities of our provisionally priced copper sales and derivative instruments to changes in commodity prices refer to “Consolidated Results – Revenues” in Part I, Item 2. of this quarterly report on Form 10-Q for the period ended June 30, 2013.

## Controls and procedures

As filed, 2,993 characters.

(a) Evaluation of disclosure controls and procedures. Our chief executive officer and chief financial officer, with the participation of management, have evaluated the effectiveness of our “disclosure controls and procedures” (as defined in Rules 13a-15(e) and 15(d)-15(e) under the Securities Exchange Act of 1934) as of the end of the period covered by this quarterly report on Form 10-Q. Based on their evaluation, they have concluded that our disclosure controls and procedures are effective as of June 30, 2013.

(b) Changes in internal control over financial reporting. During second-quarter 2011, we began a phased implementation of a new enterprise resource planning (ERP) information technology system to upgrade our information technology infrastructure and enhance operating efficiency and effectiveness. Implementation has been completed at our North America, South America, Africa and Indonesia mining operations and at our downstream operations in Europe, and we expect the initial implementation of the ERP system to be completed at all of our operations in 2013, excluding the recently acquired oil and gas operations. During each phase of the implementation, an appropriate level of training of employees, testing of the system and monitoring of the financial results recorded in the system is conducted. Management has updated our system of internal control over financial reporting for the impacted operating business units.

During second-quarter 2013, we completed our acquisitions of Plains Exploration & Production Company and McMoRan Exploration Co. (collectively known as Freeport-McMoRan Oil & Gas, or FM O&G). We consider these oil and gas acquisitions material to our results of operations, financial position and cash flows from June 1, 2013 through June 30, 2013. The assets of FM O&G represented 42 percent of our total assets as of June 30, 2013, and the revenues from the FM O&G operations represented 8 percent of our total revenues for the three months ended June 30, 2013. Refer Note 2 for additional information regarding the oil and gas acquisitions.

We are currently in the process of integrating the FM O&G operations, including internal controls and procedures and extending our Sarbanes-Oxley Act Section 404 compliance program to include FM O&G. We anticipate a successful integration of FM O&G's operations and internal controls and procedures and will continue to evaluate our internal control over financial reporting as we execute integration activities. We expect that our assessment of the effectiveness of our controls and procedures for the year ended December 31, 2013, will include FM O&G.

With the exception of the ERP implementation and the ongoing integration activities described above,

there has been no change in our internal control over financial reporting that occurred during the quarter ended June 30, 2013, that materially affected, or is reasonably likely to materially affect, our internal control over financial reporting.

## Risk factors

As filed, 18,426 characters.

During second-quarter 2013, we completed the acquisitions of Plains Exploration & Production Company (PXP) and McMoRan Exploration Co. (MMR). Accordingly, the following discussion updates the risk factors reported in Part I, Item 1A. “Risk Factors” of our annual report on Form 10-K for the year ended December 31, 2012, by addressing risk factors specific to the newly acquired oil and gas operations:

### Financial risks

***Extended declines in the market prices of copper, gold, molybdenum, and/or oil could adversely affect our earnings and cash flows and, if sustained, could adversely affect our ability to repay debt. Fluctuations in the market prices of copper, gold, molybdenum or oil can cause significant volatility in our financial performance and adversely affect the trading prices of our debt and common stock.***

In addition to the financial risks related to market prices of copper, gold and molybdenum, as described in Part I, Item 1A. “Risk Factors” of our annual report on Form 10-K for the year ended December 31, 2012, our financial results may vary with fluctuations in oil prices. Historically, the market for oil has been volatile and is likely to continue to be volatile in the future. For the three-year period ending June 30, 2013, Brent crude oil prices ranged from a low of $71.45 per barrel to a high of $126.65 per barrel. Oil prices are affected by numerous factors beyond our control, including:

- Worldwide and domestic supplies of and demand for oil;
- The level of global oil inventories;
- Weather conditions;
- Actions by the Organization of the Petroleum Exporting Countries and other major oil producing nations;
- Political conditions and events in oil producing regions, including the possibility of insurgency, terrorism or war in such areas;
- The prices of foreign exports and the availability of alternate fuel sources;
- Technological advances affecting energy exploration, production and consumption;
- The overall economic conditions in the United States (U.S.) and worldwide, including the value of the U.S. Dollar relative to other major currencies; and
- Governmental regulations and taxes.

A significant decline in the prices of oil and gas could adversely affect our financial results and our reserve estimates. We may also have to revise operating plans for our oil and gas operations, including delaying or postponing capital projects. In addition, declines in the prices of oil and gas could result in a “ceiling” write-down of the carrying value of our oil and gas properties and/or of goodwill recorded in connection with the second-quarter 2013 oil and gas acquisitions. For further discussion of our accounting policies and estimates used in evaluating our oil and gas properties and goodwill for impairment, refer to Note 3 (contained in Part I, Item 1. of this quarterly report) and to Critical Accounting Policies and Estimates (contained in Part I, Item 2. of this quarterly report). Any impairment charge related to our oil and gas properties or goodwill would potentially have a material adverse impact on our results of operations and stockholders' equity, but would have no effect on cash flows.

***A significant portion of our oil and gas production for 2013 through 2015, are hedged with derivative contracts, which may prevent us from benefitting fully from price increases and may expose us to other risks.***

PXP historically used derivative instruments to manage commodity price risk for a substantial portion of its oil and gas production. In connection with the acquisition of PXP, we assumed the 2013, 2014 and 2015 hedge positions that consist of oil options, and oil and gas swaps. As a result, we may not benefit fully from increases in oil and gas prices above the maximum fixed amount specified in the derivative contracts. In addition, these derivative instruments may also expose us to the risk of financial loss in certain circumstances, including when:

- a counterparty to the derivative contract is unable to satisfy its obligations;
- production is delayed or is less than expected; or
- there is an adverse change in the expected differential between the underlying price in the derivative instrument and actual prices received for our production.

Refer to Note 9 for a summary of our oil and gas derivative positions at June 30, 2013. Because the oil and gas derivative contracts do not qualify for hedge accounting and are recorded at fair value with the mark-to-market gains and losses recorded in revenues, we expect fluctuations in our consolidated statements of income as changes occur in the index prices.

### Operational risks

***Oil and gas reserves are estimates, and actual recoveries may vary significantly.***

There are numerous uncertainties inherent in estimating quantities and values of reserves. Petroleum engineering is a subjective process of estimating underground accumulations of oil and gas that cannot be measured in an exact manner. Because of the high degree of judgment involved, the accuracy of any reserve estimate is inherently imprecise, and a function of the quality of available data and the engineering and geological interpretation. In accordance with Securities and Exchange Commission guidelines, our estimates of proved oil and gas reserves are based on the twelve-month average of the first-day-of-the-month reference prices as adjusted for location and quality differentials. Therefore, these reserve quantities will change when actual oil or gas prices increase or decrease. Our estimates of economically recoverable oil and gas reserves and of the related future net cash flows depend upon a number of factors and assumptions that may vary from actual results, including:

- Historical production from the area, compared with production from other comparable producing areas;
- The effects of regulations by governmental agencies;
- Future oil and gas prices; and
- Amounts and timing of future operating costs, transportation costs, severance and excise taxes, development costs and workover and remedial costs.

Future decreases in estimated proved oil and gas reserves could result in prospective changes to our depletion rates, which could have a significant impact on our results of operations. Estimated proved oil and gas reserve decreases could also result in impairment of our oil and gas properties and/or to goodwill recorded in connection with the second-quarter 2013 oil and gas acquisitions. Any impairment charge related to our oil and gas properties or goodwill would potentially have a material adverse impact on our results of operations and stockholders' equity, but would have no effect on cash flows. For further discussion of our accounting policies and estimates used in evaluating our oil and gas properties and goodwill for impairment, refer to Note 3 (contained in Part I, Item 1. of this quarterly report) and to Critical Accounting Policies and Estimates (contained in Part I, Item 2. of this quarterly report).

***We must continually replace oil and gas reserves depleted by production. We may not be successful in acquiring, developing or exploring oil and gas properties.***

The future success of our oil and gas operations depends on our ability to find, develop and acquire additional oil and gas reserves that are economically recoverable. Without successful acquisition or exploration activities, our oil and gas reserves will decline as a result of our current reserves being depleted by production and we may not be able to find or acquire additional reserves that are economically recoverable.

***Operations in the deepwaters of the Gulf of Mexico (GOM) present unique and more costly operating risks than operations in the shallower waters or onshore. In addition, our ultra-deep prospects, which target shallow water, ultra-deep formations on the Shelf of the GOM and onshore Gulf Coast, have greater risks and costs associated with their exploration and development than conventional GOM prospects.***

The Deepwater GOM area has had relatively limited drilling activity due to risks associated with geological complexity, water depth and higher drilling and development costs, any of which can cause substantial cost overruns and uneconomic projects or wells. The Deepwater GOM also lacks the infrastructure present in shallower waters, which can result in significant delays in obtaining or maintaining production. As a result, deepwater operations may require significant time between a discovery and marketability, thereby increasing the financial risk of these operations.

Our objectives in our ultra-deep prospects target formations below the salt weld (i.e., ultra-deep targets) in the shallow water of the GOM Shelf and onshore in South Louisiana. These ultra-deep targets have not traditionally been the subject of exploratory activity in these regions, so that little direct comparative data is available. To date, there has been no production of hydrocarbons from ultra-deep reservoirs in these areas. As a result of the unavailability of direct comparative data and limitations of diagnostic tools that operate in the extreme temperatures and pressures encountered, it is very difficult to predict with accuracy the reservoir quality and performance of ultra-deep formations. Additionally, ultra-deep formations are significantly more expensive to drill and complete than wells drilled on the GOM Shelf at more conventional depths. Major contributors to such increased costs include far higher temperatures and pressures encountered down hole and longer drilling times.

***Operating hazards, natural disasters or other interruptions of our oil and gas operations could result in potential liabilities, which may not be fully covered by our insurance.***

In addition to the operational risks that could adversely affect our business, as described in Part I, Item 1A. “Risk Factors” of our annual report on Form 10-K for the year ended December 31, 2012, the oil and gas business involves operating hazards such as well blowouts, cratering, explosions, fires, uncontrollable flows of oil, gas or well fluids, pipeline ruptures, pollution, and releases of toxic gas, as well as natural disasters such as earthquakes, mudslides, and hurricanes. Any of these operating hazards could cause personal injuries, fatalities, oil spills, discharge of hazardous materials, lost production, remediation and clean-up costs and other environmental damages, or property damage, all of which could adversely affect our business, operating results and cash flows.

***Our oil and gas operations are subject to extensive regulation, some of which require permits and other approvals. These regulations increase our costs and in some circumstances may terminate, delay or suspend our operations.***

Our oil and gas business is subject to extensive federal, state and local laws and regulations that are interpreted by governmental agencies and other bodies vested with broad authority relating to the exploration for, and the development, production and transportation of, oil and gas, as well as environmental and safety matters. Certain of these regulations require permits for the drilling and operation of wells. Existing laws and regulations, or their interpretations, can be changed, and any changes can increase costs of compliance and operations, delay projects or significantly limit drilling activity which could adversely affect our business, operating results and cash flows.

***Certain of our undeveloped leasehold acreage is subject to leases that will expire over the next several years unless production is established on units containing the acreage.***

Unless production in paying quantities is established on units containing undeveloped leasehold acreage during their terms, the leases will expire. If leases expire and we are unable to renew them, we will lose our right to develop those properties. Our drilling plans are subject to change based upon various factors, including drilling results, oil and gas prices, the availability and cost of capital, drilling and production costs, availability of drilling services and equipment, gathering system and pipeline transportation constraints, and regulatory approvals.

***We have limited control over the development of properties in which we have an interest but do not operate.***

Certain of our oil and gas properties, including Lucius, Ram Powell, Lineham Creek, Haynesville and portions of our Eagle Ford acreage, are operated by other companies and involve third-party working interest owners. As a result, we have limited ability to influence or control the operation or future development of such properties, including compliance with environmental, safety and other regulations, or the amount of capital expenditures that we will be required to fund with respect to such properties. Additionally, we are dependent on the other working interest owners of such projects to fund their contractual share of the operating costs and capital expenditures of such projects. These limitations and our dependence on the operator and other working interest owners for these projects could cause us to incur unexpected future costs, result in lower production and materially and adversely affect our financial condition and results of operations.

### Environmental risks

***Our oil and gas operations may incur significant costs related to environmental matters.***

Oil and gas operations are subject to environmental hazards, such as oil spills, gas leaks, ruptures, discharges of petroleum products and hazardous substances, and historical disposal activities. These environmental hazards could expose us to material liabilities for property damages, personal injuries or other environmental harm, including costs of investigating and remediating contaminated properties. We may also be liable for environmental damages caused by the previous owners or operators of properties we are currently operating.

Our oil and gas operations are subject to federal, state and local laws and regulations relating to the discharge of materials into, and the protection of, the environment. These laws and regulations, among other things, impose liability on the lessee under an oil and gas lease for the cost of pollution clean-up resulting from operations, subject the lessee to liability for pollution damages and require suspension or cessation of operations in affected areas. Any noncompliance with these laws and regulations could result in material administrative, civil or criminal penalties or other liabilities. Additionally, our compliance with these laws may, from time to time, result in delays to project implementation, and increased costs to our operations or decreased production. Furthermore, changes to existing laws and regulations, or their interpretations, can result in increased costs of compliance and operations, delayed projects, or significantly limited drilling activity.

In addition, in response to the 2010 Deepwater Horizon incident, the Bureau of Ocean Energy Management and the Bureau of Safety and Environmental Enforcement issued new guidelines and regulations regarding safety, environmental matters, drilling equipment, and decommissioning applicable to drilling in the GOM. The enactment of new or stricter regulations in the U.S. and increased liability for companies operating in this area could adversely impact our oil and gas operations in the GOM.

***Proposed federal, state or local regulations regarding hydraulic fracturing could increase our operating and capital costs.***

Our oil and gas operations utilize hydraulic fracturing and other types of well stimulation. Hydraulic fracturing involves the injection of water, sand and chemicals under pressure into rock formations to stimulate the flow of oil and gas. Hydraulic fracturing is necessary to produce commercial quantities of oil and gas from many reservoirs, especially shale formations such as the Haynesville Shale and the Eagle Ford Shale.

The process is typically regulated by state oil and gas commissions and agencies, and continues to receive significant regulatory and legislative attention at the federal, state, and local levels. Several proposals are before the U.S. Congress that, if implemented, would either prohibit or restrict the practice of hydraulic fracturing or subject the process to more extensive regulations. Several states have adopted or are considering legislation to regulate hydraulic fracturing practices that could impose more stringent permitting, transparency, and well construction requirements on hydraulic-fracturing operations or otherwise seek to ban fracturing activities altogether. In addition, some municipalities have significantly limited or prohibited drilling activities and/or hydraulic fracturing, or are considering doing so.

Although it is not possible to predict the final outcome of any legislation regarding hydraulic fracturing, any new federal, state or local restrictions on hydraulic fracturing that are enacted in areas where we conduct our oil and gas operations could result in increased compliance costs or additional operating restrictions in the U.S.

### Other risks

***We may experience difficulties in integrating the oil and gas businesses of PXP and MMR, which could cause us to fail to realize many of the anticipated potential synergies of our acquisitions of PXP and MMR.***

We acquired PXP and MMR because we believe that the transactions will be beneficial to our company and our stockholders. Achieving the anticipated benefits of the transactions will depend in part upon whether we can integrate these oil and gas businesses in an efficient and effective manner. We may not be able to accomplish this integration process smoothly or successfully. The difficulties of combining the oil and gas businesses of PXP and MMR potentially will include, among other things:

- Coordinating geographically separated organizations and addressing possible differences with respect to incorporating corporate cultures and management philosophies;
- Dedicating significant management resources to the integration, which may temporarily distract management's attention from the day-to-day business of the combined company;
- Operating in states where we have not previously conducted business; and
- Operating an oil and gas business, which is a line of business in which FCX has not historically engaged.

Filed Aug 9, 2013.
Source: SEC EDGAR, the filing index for accession 0000831259-13-000057. Last ingested by Listed: Nov 6, 2026, 13:42 ET. No prices; not investment advice.