# Freeport-Mcmoran Inc: Form 10-Q for the period ended Jun 30, 2015

- Company: [Freeport-Mcmoran Inc](/companies/fcx.md) (CIK 831259)
- Form: 10-Q
- Filed: 2015-08-10
- Accepted by EDGAR: Aug 10, 2015, 06:03 ET
- Period: 2015-06-30
- Accession: 0000831259-15-000043
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/831259/000083125915000043/fcxq21510-q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/831259/000083125915000043/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2015-06-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 6 months, 2015-01-01 to 2015-06-30 | $8.40bn | us-gaap:SalesRevenueNet |
| Cost of revenue | 3 months, 2015-04-01 to 2015-06-30 | $6.42bn | us-gaap:CostOfGoodsSold |
| Cost of revenue | 6 months, 2015-01-01 to 2015-06-30 | $13.38bn | us-gaap:CostOfGoodsSold |
| Selling, general and administrative | 3 months, 2015-04-01 to 2015-06-30 | $151.0m | us-gaap:SellingGeneralAndAdministrativeExpense |
| Selling, general and administrative | 6 months, 2015-01-01 to 2015-06-30 | $305.0m | us-gaap:SellingGeneralAndAdministrativeExpense |
| Operating income | 3 months, 2015-04-01 to 2015-06-30 | −$2.37bn | us-gaap:OperatingIncomeLoss |
| Operating income | 6 months, 2015-01-01 to 2015-06-30 | −$5.34bn | us-gaap:OperatingIncomeLoss |
| Income tax | 3 months, 2015-04-01 to 2015-06-30 | −$687.0m | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 6 months, 2015-01-01 to 2015-06-30 | −$1.38bn | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2015-04-01 to 2015-06-30 | −$1.80bn | us-gaap:ProfitLoss |
| Net income | 6 months, 2015-01-01 to 2015-06-30 | −$4.21bn | us-gaap:ProfitLoss |
| Diluted EPS | 3 months, 2015-04-01 to 2015-06-30 | −$1.78 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 6 months, 2015-01-01 to 2015-06-30 | −$4.16 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2015-04-01 to 2015-06-30 | −$1.78 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 6 months, 2015-01-01 to 2015-06-30 | −$4.16 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2015-04-01 to 2015-06-30 | 1,040,000,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 6 months, 2015-01-01 to 2015-06-30 | 1,040,000,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 6 months, 2015-01-01 to 2015-06-30 | $1.79bn | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 3 months, 2015-04-01 to 2015-06-30 | $1.66bn | us-gaap:PaymentsToAcquireProductiveAssets |
| Capital expenditure | 6 months, 2015-01-01 to 2015-06-30 | $3.53bn | us-gaap:PaymentsToAcquireProductiveAssets |
| Dividends paid | 6 months, 2015-01-01 to 2015-06-30 | $380.0m | us-gaap:PaymentsOfDividendsCommonStock |
| Cash and equivalents | at 2015-06-30 | $466.0m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2015-06-30 | $8.70bn | us-gaap:AssetsCurrent |
| Total assets | at 2015-06-30 | $54.01bn | us-gaap:Assets |
| Current liabilities | at 2015-06-30 | $4.74bn | us-gaap:LiabilitiesCurrent |
| Total liabilities | at 2015-06-30 | $35.20bn | us-gaap:Liabilities |
| Long-term debt | at 2015-06-30 | $20.11bn | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2015-06-30 | $791.0m | us-gaap:DebtCurrent |
| Shareholders' equity | at 2015-06-30 | $13.80bn | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 218,480 characters.

*In Management’s Discussion and Analysis of Financial Condition and Results of Operations, "we," "us" and "our" refer to Freeport-McMoRan Inc. (FCX) and its consolidated subsidiaries. You should read this discussion in conjunction with our financial statements, the related Management’s Discussion and Analysis of Financial Condition and Results of Operations and the discussion of our Business and Properties in our annual report on Form 10-K for the year ended December 31, 2014, filed with the United States (U.S.) Securities and Exchange Commission (SEC). The results of operations reported and summarized below are not necessarily indicative of future operating results (refer to "Cautionary Statement" for further discussion). References to "Notes" are Notes included in our Notes to Consolidated Financial Statements. Throughout Management's Discussion and Analysis of Financial Condition and Results of Operations, all references to earnings or losses per share are on a diluted basis.*

### OVERVIEW

We are a premier U.S.-based natural resources company with an industry-leading global portfolio of mineral assets, significant oil and gas resources and a growing production profile. We are the world's largest publicly traded copper producer. Our portfolio of assets includes the Grasberg minerals district in Indonesia, one of the world's largest copper and gold deposits; significant mining operations in North and South America; the Tenke Fungurume (Tenke) minerals district in the Democratic Republic of Congo (DRC) in Africa; and significant U.S. oil and natural gas assets, including reserves in the Deepwater Gulf of Mexico (GOM), onshore and offshore California, the Haynesville shale play in Louisiana, the Madden area in Central Wyoming and a position in the Inboard Lower Tertiary/Cretaceous natural gas trend onshore in South Louisiana.

Our results for the second quarter and first six months of 2015, compared with 2014 periods, reflect lower commodity price realizations and lower oil sales volumes, partly offset by higher gold sales volumes. The first six months of 2015 also reflects higher copper sales volumes, compared with the first six months of 2014. Results for the 2015 periods were impacted by net charges of $2.7 billion ($2.0 billion to net loss attributable to common stockholders) in second-quarter 2015 and $5.8 billion ($4.4 billion to net loss attributable to common stockholders) for the first six months of 2015, for the impairment of our oil and gas properties pursuant to full cost accounting rules and the related tax charges to establish a deferred tax valuation allowance. Refer to “Consolidated Results” for further discussion of our consolidated financial results for the three- and six-month periods ended June 30, 2015 and 2014.

At June 30, 2015, we had $466 million in consolidated cash and cash equivalents and $20.9 billion in total debt. We have made substantial progress toward the completion of our major mining development projects, which are expected to result in increased near-term production, lower unit costs, declining capital expenditures and to contribute to cash flow from operations after capital expenditures in future years. In addition, positive oil and gas drilling and development activities are expected to result in a growing oil production profile. We remain focused on maintaining a strong balance sheet and on continuing to manage costs, capital spending plans and other actions as required to maintain financial strength.

Subsequent to June 30, 2015, copper and molybdenum prices have fallen and at July 31, 2015, prices we would expect to record additional charges for LCM inventory adjustments in third-quarter 2015. Additionally, as further discussed in “Critical Accounting Estimates” in Part II, Items 7. And 7A. of our annual report on Form 10-K for the year ended December 31, 2014, we regularly assess the carrying values of our long-lived mining assets, and decreases in metal prices or other factors may result in impairment of our long-lived mining assets. Also, refer to "Operations - Oil and Gas" for further discussion of potentially significant additional ceiling test impairments of our oil and gas properties.

In July 2015, we announced that we are undertaking a comprehensive review of operating plans in our mining and oil and gas businesses to target significant additional reductions in capital spending and operating and administrative costs in response to weak market conditions for our major products. On August 5, 2015, we provided an update on our progress and announced the deferral of investments in several long-term projects in our oil and gas business, which will result in a reduction of $0.9 billion in projected capital expenditures for each of the years 2016 and 2017. We have also revised our estimate of the start-up of initial production from its recent drilling success in the Horn Mountain area to 2016 from the previously estimated start-up in 2017. The revised plans, together with the previously announced potential initial public offering (IPO) of a minority interest in our wholly owned subsidiary, Freeport-McMoRan Oil & Gas Inc., and potential other actions, will be pursued as required to fund oil and gas capital spending with cash flow for 2016 and subsequent years. Refer to “Operations - Oil and Gas” for further discussion of the potential IPO.

We are completing the review of operating plans at each of our copper and molybdenum mining operations and will revise operating and capital plans to strengthen our financial position in a weak copper price environment. The revised plans will target lower operating and capital costs to achieve maximum cash flow under the current market conditions. Production at certain operations challenged by low commodity prices will be curtailed. We expect to complete this review promptly and will report our revised plans during third-quarter 2015. We will also continue to assess opportunities to partner with strategic investors potentially interested in investing capital with FCX in the development of our oil and gas and mining properties. We have a broad set of assets with valuable infrastructure and associated resources with attractive long-term production and development potential.

### OUTLOOK

We view the long-term outlook for our business positively, supported by limitations on supplies of copper and by the requirements for copper and oil in the world’s economy. Our financial results vary as a result of fluctuations in market prices primarily for copper, gold, molybdenum and oil, as well as other factors. World market prices for these commodities have fluctuated historically and are affected by numerous factors beyond our control. Because we cannot control the price of our products, the key measures that management focuses on in operating our business are sales volumes, unit net cash costs for our mining operations, cash production costs per barrel of oil equivalent (BOE) for our oil and gas operations and operating cash flow. As discussed above in "Overview," we are undertaking a comprehensive review of operating plans in our mining business to target significant additional reductions in capital spending, and operating and administrative costs, which we expect to report during third-quarter 2015. Accordingly, the following outlook is subject to change as a result of the review and other factors.

*Sales Volumes.* Following are our projected consolidated sales volumes for the year 2015:

| Copper (millions of recoverable pounds): |  |  |
| --- | ---: | --- |
| North America copper mines | 1,960 |  |
| South America mining | 900 |  |
| Indonesia mining | 860 |  |
| Africa mining | 460 |  |
|  | 4,180 |  |
| Gold (thousands of recoverable ounces) | 1,300 |  |
| Molybdenum (millions of recoverable pounds) | 93 | a |
| Oil Equivalents (million BOE or MMBOE) | 52.9 |  |

a. Projected molybdenum sales include 44 million pounds produced by our Molybdenum mines and 49 million pounds produced by our North and South America copper mines.

Consolidated sales for third-quarter 2015 are expected to approximate 1.0 billion pounds of copper, 315 thousand ounces of gold, 24 million pounds of molybdenum and 13.6 MMBOE. Projected sales volumes are dependent on a number of factors, including operational performance and other factors. For other important factors that could cause results to differ materially from projections, refer to "Cautionary Statement."

*Mining Unit Net Cash Costs.* Assuming average prices of $1,150 per ounce of gold and $6 per pound of molybdenum for the second half of 2015, and achievement of current sales volume and cost estimates, consolidated unit net cash costs (net of by-product credits) for our copper mines are expected to average $1.53 per pound of copper for the year 2015. Quarterly unit net cash costs vary with fluctuations in sales volumes and average realized prices (primarily gold and molybdenum prices). The impact of price changes for the second half of 2015 on consolidated unit net cash costs would approximate $0.01 per pound for each $50 per ounce change in the average price of gold and $0.01 per pound for each $2 per pound change in the average price of molybdenum. Refer to “Consolidated Results – Production and Delivery Costs” for further discussion of consolidated production and delivery costs for our mining operations.

*Oil and Gas Cash Production Costs per BOE.* Based on current sales volume and cost estimates for the second half of 2015, oil and gas cash production costs are expected to approximate $20 per BOE for the year 2015. Refer to “Operations – Oil and Gas” for further discussion of oil and gas production costs.

*Consolidated Operating Cash Flow.* Our consolidated operating cash flows vary with prices realized from copper, gold, molybdenum and oil sales, sales volumes, production costs, income taxes (refer to “Consolidated Results – Income Taxes” for further discussion of projected income taxes), other working capital changes and other factors. Based on current sales volume and cost estimates, and assuming average prices of $2.50 per pound of copper, $1,150 per ounce of gold, $6 per pound of molybdenum and $56 per barrel of Brent crude oil for the second half of 2015, consolidated operating cash flows are estimated to approximate $3.6 billion for the year 2015. The impact of price changes during the second half of 2015 on operating cash flows would approximate $190 million for each $0.10 per pound change in the average price of copper, $25 million for each $50 per ounce change in the average price of gold, $60 million for each $2 per pound change in the average price of molybdenum and $55 million for each $5 per barrel change in the average Brent crude oil price.

### MARKETS

Metals. World prices for copper, gold and molybdenum can fluctuate significantly. During the period from January 2005 through July 2015, the London Metal Exchange (LME) spot copper price varied from a low of $1.26 per pound in 2008 to a record high of $4.60 per pound in 2011; the London Bullion Market Association (London) PM gold price fluctuated from a low of $411 per ounce in 2005 to a record high of $1,895 per ounce in 2011; and the *Metals Week* Molybdenum Dealer Oxide weekly average price ranged from a low of $5.87 per pound in 2015 to a record high of $39.25 per pound in 2005. Copper, gold and molybdenum prices are affected by numerous factors beyond our control as described further in our “Risk Factors” contained in Part I, Item 1A of our annual report on Form 10-K for the year ended December 31, 2014.

This graph presents LME spot copper prices and the combined reported stocks of copper at the LME, Commodity Exchange Inc., a division of the New York Mercantile Exchange (NYMEX), and the Shanghai Futures Exchange from January 2005 through July 2015. From 2006 through most of 2008, limited supplies, combined with growing demand from China and other emerging economies, resulted in high copper prices and low levels of inventories. We believe current copper prices are supported by a combination of demand from developing economies and pro-growth monetary fiscal policy decisions in Europe, China and the U.S. Since mid-2014, copper prices have declined because of concerns about slowing growth rates in China, a stronger U.S. dollar and a broad-based decline in commodity prices. Renewed concerns about Chinese economic growth rates, concerns about Europe, continued U.S. dollar strength and broad-based weakness in commodity prices in general put downward pressure on copper prices during second-quarter 2015. LME spot copper prices ranged from a low of $2.56 per pound to a high of

$2.92 per pound during second-quarter 2015, averaged $2.74 per pound and closed at $2.60 per pound on June 30, 2015. LME spot copper prices have declined further during July 2015, closing at $2.37 per pound on July 31, 2015.

We believe the underlying long-term fundamentals of the copper business remain positive, supported by the significant role of copper in the global economy and a challenging long-term supply environment attributable to difficulty in replacing existing large mines' output with new production sources. Future copper prices are expected to be volatile and are likely to be influenced by demand from China and emerging markets, as well as economic activity in the U.S. and other industrialized countries, the timing of the development of new supplies of copper, and production levels of mines and copper smelters.

This graph presents London PM gold prices from January 2005 through July 2015. An improving economic outlook and positive equity performance contributed to lower demand for gold in 2014 and early 2015, resulting in generally lower prices. During second-quarter 2015, London PM gold prices ranged from a low of $1,165 per ounce to a high of $1,225 per ounce, averaged $1,192 per ounce and closed at $1,171 per ounce on June 30, 2015. Gold prices have declined further during 2015 and closed at $1,098 per ounce on July 31, 2015.

This graph presents the *Metals Week* Molybdenum Dealer Oxide weekly average prices from January 2005 through July 2015. Molybdenum prices have declined since mid-2014 because of weaker demand from European and U.S. steel and stainless steel producers. During second-quarter 2015, the weekly average price of molybdenum ranged from a low of $6.38 per pound to a high of $8.24 per pound, averaged $7.57 per pound and was $6.38 on June 30, 2015. The *Metals Week* Molybdenum Dealer Oxide weekly average price has declined further during July 2015 and was $5.87 per pound on July 31, 2015.

Oil and Gas. Market prices for crude oil and natural gas can fluctuate significantly. During the period from January 2005 through July 2015, the Brent crude oil price ranged from a low of $36.61 per barrel to a high of $146.08 per barrel in 2008 and the NYMEX natural gas price fluctuated from a low of $2.04 per million British thermal units (MMBtu) in 2012 to a high of $13.91 per MMBtu in 2005. Crude oil and natural gas prices are affected by numerous factors beyond our control as described further in our “Risk Factors” contained in Part I, Item 1A. of our annual report on Form 10-K for the year ended December 31, 2014.

This graph presents Brent crude oil prices and NYMEX natural gas contract prices from January 2005 through July 2015. Crude oil prices reached a record high in July 2008 as economic growth in emerging economies and the U.S. created high global demand for oil and lower inventories. By the end of 2008, financial turmoil in the U.S. contributed to a global economic slowdown and a decline in many commodity prices. Crude oil prices rebounded

after 2008, supported by a gradually improving global economy and demand outlook. Since mid-2014, oil prices have significantly declined associated with global oversupply primarily attributable to continued strong production from U.S. shale plays, the Organization of Petroleum Exporting Countries and Russia, coupled with weak economic data in Europe and slowing Chinese demand. During second-quarter 2015, Brent crude oil prices ranged from a low of $54.95 per barrel to a high of $67.77 per barrel, averaged $63.57 per barrel and were $63.59 per barrel on June 30, 2015. The Brent crude oil price has declined further during July 2015 and was $52.21 per barrel on July 31, 2015.

### CONSOLIDATED RESULTS

*(in millions, except per share amounts)*

| SUMMARY FINANCIAL DATA | Three Months Ended June 30, 2015 |  | 2014a |  | Six Months Ended June 30, 2015 |  | 2014a |  |
| --- | ---: | --- | ---: | --- | ---: | --- | ---: | --- |
| Revenuesb,c,d | $4,248 |  | $5,522 |  | $8,401 |  | $10,507 |  |
| Operating (loss) incomeb,c,d | $(2,374) | e,f,g | $1,153 | h,i | $(5,337) | e,f,g,j | $2,264 | h,i |
| Net (loss) income attributable to common stockc,d,k | $(1,851) | e,f,g,l,m | $482 | h,i,n | $(4,325) | e,f,g,j,l,m | $992 | h,i,n |
| Diluted net (loss) income per share attributable to common stock | $(1.78) | e,f,g,l,m | $0.46 | h,i,n | $(4.16) | e,f,g,j,l,m | $0.95 | h,i,n |
| Diluted weighted-average common shares outstanding | 1,040 |  | 1,045 |  | 1,040 |  | 1,045 |  |
| Operating cash flowso | $1,069 |  | $1,386 |  | $1,786 |  | $2,587 |  |
| Capital expenditures | $1,661 |  | $1,950 |  | $3,528 |  | $3,562 |  |
| At June 30: |  |  |  |  |  |  |  |  |
| Cash and cash equivalents | $466 |  | $1,458 |  | $466 |  | $1,458 |  |
| Total debt, including current portion | $20,902 |  | $20,190 |  | $20,902 |  | $20,190 |  |

a. Includes the results of the Candelaria and Ojos del Salado mines that were sold in November 2014, and the Eagle Ford properties that were sold in June 2014.

b. As further detailed in Note 10, following is a summary of revenues and operating income (loss) by operating division (in millions):

| Revenues | Three Months Ended June 30, 2015 | 2014 | Six Months Ended June 30, 2015 | 2014 |
| --- | ---: | ---: | ---: | ---: |
| North America copper mines | $1,405 | $1,469 | $2,740 | $2,755 |
| South America mining | 453 | 1,031 | 939 | 1,929 |
| Indonesia mining | 790 | 523 | 1,397 | 993 |
| Africa mining | 351 | 418 | 761 | 745 |
| Molybdenum mines | 102 | 170 | 215 | 296 |
| Rod & Refining | 1,097 | 1,242 | 2,166 | 2,396 |
| Atlantic Copper Smelting & Refining | 500 | 629 | 1,046 | 1,222 |
| U.S. oil & gas operations | 569 | 1,236 | 1,069 | 2,497 |
| Other mining, corporate, other & eliminations | (1,019) | (1,196) | (1,932) | (2,326) |
| Total revenues | $4,248 | $5,522 | $8,401 | $10,507 |
| Operating income (loss) |  |  |  |  |
| North America copper mines | $300 | $468 | $594 | $858 |
| South America mining | 65 | 404 | 130 | 737 |
| Indonesia mining | 232 | (67) | 305 | (49) |
| Africa mining | 101 | 154 | 200 | 275 |
| Molybdenum mines | (7) | 65 | (3) | 93 |
| Rod & Refining | 6 | 6 | 10 | 10 |
| Atlantic Copper Smelting & Refining | 19 | (4) | 31 | (13) |
| U.S. oil & gas operations | (2,932) | 232 | (6,403) | 509 |
| Other mining, corporate, other & eliminations | (158) | (105) | (201) | (156) |
| Total operating (loss) income | $(2,374) | $1,153 | $(5,337) | $2,264 |

c. Includes (unfavorable) favorable adjustments to provisionally priced concentrate and cathode copper sales recognized in prior periods totaling $(20) million ($(10) million to net loss attributable to common stock or $(0.01) per share) for second-quarter 2015, $35 million ($16 million to net income attributable to common stock or $0.01 per share) for second-quarter 2014, $(106) million ($(50) million to net loss attributable to common stock or $(0.05) per share) for the first six months of 2015 and $(118) million ($(65) million to net income attributable to common stock or $(0.06) per share) for the first six months of 2014. Refer to “Revenues” for further discussion.

d. Includes net noncash mark-to-market (losses) gains associated with crude oil and natural gas derivative contracts totaling $(95) million ($(59) million to net loss attributable to common stock or $(0.06) per share) for second-quarter 2015, $(7) million ($(4) million to net income attributable to common stock or less than $(0.01) per share) for second-quarter 2014, $(143) million ($(89) million to net loss attributable to common stock or $(0.09) per share) for the first six months of 2015 and $8 million ($5 million to net income attributable to common stock or less than $0.01 per share) for the first six months of 2014. Refer to "Revenues" for further discussion.

e. Includes charges to reduce the carrying value of oil and gas properties pursuant to full cost accounting rules of $2.7 billion ($1.7 billion to net loss attributable to common stock or $1.61 per share) for second-quarter 2015 and $5.8 billion ($3.6 billion to net loss attributable to common stock or $3.47 per share) for the first six months of 2015. See Note 1 and "Operations - Oil & Gas" for further discussion.

f. Includes charges for lower of cost or market (LCM) adjustments primarily attributable to molybdenum inventories totaling $59 million ($38 million to net loss attributable to common stock or $0.04 per share) for second-quarter 2015 and $63 million ($41 million to net loss attributable to common stock or $0.04 per share) for the first six months of 2015. See Note 4 for further discussion.

g. Includes net charges for idle/terminated rig costs and inventory write-downs at oil and gas operations of $22 million ($14 million to net loss attributable to common stock or $0.01 per share) for second-quarter 2015 and $39 million ($24 million to net loss attributable to common stock or $0.02 per share) for the first six months of 2015.

h. Includes net charges for adjustments to environmental obligations and related litigation reserves of $69 million ($68 million to net income attributable to common stock or $0.06 per share) for the second quarter and first six months of 2014.

i. Includes charges for fixed costs charged directly to cost of sales as a result of the impact of export restrictions on PT Freeport Indonesia's (PT-FI) operating rates of $56 million ($30 million to net income attributable to common stock or $0.03 per share) for second-quarter 2014 and $109 million ($58 million to net income attributable to common stock or $0.06 per share) for the first six months of 2014.

j. The first six months of 2015 includes a net gain of $39 million ($25 million to net loss attributable to common stock or $0.02 per share) associated with the sale of FCX's one-third interest in the Luna Energy power facility in New Mexico.

k. We defer recognizing profits on intercompany sales until final sales to third parties occur. For a summary of net impacts from changes in these deferrals, refer to "Operations - Smelting & Refining."

l. The second quarter and first six months of 2015 include a gain of $92 million ($0.09 per share) related to net proceeds received from insurance carriers and other third parties related to the shareholder derivative litigation settlement.

m. As a result of the impairment to oil and gas properties, we recorded tax charges to establish a valuation allowance primarily against U.S. federal alternative minimum tax credits of $305 million ($0.29 per share) for second-quarter 2015 and $763 million ($0.73 per share) for the first six months of 2015.

n. The second quarter and first six months of 2014 included a tax charge of $58 million ($0.06 per share) associated with deferred taxes recorded in connection with the allocation of goodwill to the sale of Eagle Ford.

o. Includes net working capital uses and changes in other tax payments of $104 million for second-quarter 2015, $364 million for second-quarter 2014, $190 million for the first six months of 2015, and $777 million for the first six months of 2014.

| SUMMARY OPERATING DATA Copper | Three Months Ended June 30, 2015 | 2014a | Six Months Ended June 30, 2015 | 2014a |
| --- | ---: | ---: | ---: | ---: |
| Production (millions of recoverable pounds) | 977 | 931 | 1,892 | 1,879 |
| Sales, excluding purchases (millions of recoverable pounds) | 964 | 968 | 1,924 | 1,839 |
| Average realized price per pound | $2.71 | $3.16 | $2.70 | $3.17 |
| Site production and delivery costs per poundb | $1.85 | $1.99 | $1.89 | $1.94 |
| Unit net cash costs per poundb | $1.50 | $1.72 | $1.57 | $1.64 |
| **Gold** |  |  |  |  |
| Production (thousands of recoverable ounces) | 367 | 166 | 626 | 397 |
| Sales, excluding purchases (thousands of recoverable ounces) | 352 | 159 | 615 | 346 |
| Average realized price per ounce | $1,174 | $1,296 | $1,183 | $1,299 |
| **Molybdenum** |  |  |  |  |
| Production (millions of recoverable pounds) | 25 | 25 | 49 | 49 |
| Sales, excluding purchases (millions of recoverable pounds) | 23 | 25 | 46 | 52 |
| Average realized price per pound | $9.51 | $13.43 | $9.84 | $12.27 |
| **Oil Equivalents** |  |  |  |  |
| Sales volumes |  |  |  |  |
| MMBOE | 13.1 | 16.0 | 25.6 | 32.2 |
| Thousand BOE (MBOE) per day | 144 | 176 | 142 | 178 |
| Cash operating margin per BOEc |  |  |  |  |
| Realized revenues | $50.04 | $77.53 | $46.95 | $77.37 |
| Cash production costs | 19.04 | 19.57 | 19.62 | 19.03 |
| Cash operating margin | $31.00 | $57.96 | $27.33 | $58.34 |

a. The 2014 periods include the results of the Candelaria and Ojos del Salado mines that were sold in November 2014, and the Eagle Ford properties that were sold in June 2014. Sales volumes from Candelaria and Ojos del Salado totaled 80 million pounds of copper and 20 thousand ounces of gold for second-quarter 2014 and 174 million pounds of copper and 43 thousand ounces of gold for the first six months of 2014; sales volumes from Eagle Ford totaled 4.0 MMBOE (44 MBOE per day) for second-quarter 2014 and 8.7 MMBOE (48 MBOE per day) for the first six months of 2014.

b. Reflects per pound weighted-average production and delivery costs and unit net cash costs (net of by-product credits) for all copper mines. For reconciliations of per pound unit costs by operating division to production and delivery costs applicable to sales reported in our consolidated financial statements, refer to "Product Revenues and Production Costs."

c. Cash operating margin for oil and gas operations reflects realized revenues less cash production costs. Realized revenues exclude noncash mark-to-market adjustments on derivative contracts. For reconciliations of realized revenues and cash production costs per BOE to revenues and production and delivery costs reported in our consolidated financial statements, refer to "Product Revenues and Production Costs."

### Revenues

Consolidated revenues totaled $4.2 billion in second-quarter 2015 and $8.4 billion for the first six months of 2015, compared with $5.5 billion in second-quarter 2014 and $10.5 billion for the first six months of 2014. Revenues include the sale of copper concentrates, copper cathodes, copper rod, gold, molybdenum, silver and cobalt by our mining operations, and the sale of oil, natural gas and natural gas liquids (NGLs) by our oil and gas operations.

Following is a summary of changes in our consolidated revenues between periods (in millions):

|  | Three Months Ended June 30, | Six Months Ended June 30, |
| --- | ---: | ---: |
| Consolidated revenues - 2014 periods | $5,522 | $10,507 |
| Mining operations: |  |  |
| Higher (lower) sales volumes from mining operations: |  |  |
| Copper | (14) | 268 |
| Gold | 248 | 349 |
| Molybdenum | (26) | (65) |
| Lower average realized prices from mining operations: |  |  |
| Copper | (434) | (904) |
| Gold | (43) | (72) |
| Molybdenum | (89) | (112) |
| Net adjustments for prior period provisionally priced copper sales | (55) | 12 |
| Lower revenues from purchased copper | (44) | (52) |
| Lower Atlantic Copper revenues | (129) | (176) |
| Oil and gas operations: |  |  |
| Lower oil sales volumes | (293) | (613) |
| Lower oil average realized prices, including cash gains (losses) on derivative contacts | (240) | (552) |
| Net noncash mark-to-market adjustments on derivative contracts | (88) | (151) |
| Other, including intercompany eliminations | (67) | (38) |
| Consolidated revenues - 2015 periods | $4,248 | $8,401 |

#### Mining Operations

Sales Volumes. Consolidated copper sales volumes were 964 million pounds of copper in second-quarter 2015 and 1.9 billion pounds for the first six months of 2015, compared with 968 million pounds in second-quarter 2014 and 1.8 billion pounds for the first six months of 2014. The 2015 periods primarily reflect higher copper sales volumes from North America and Indonesia, offset by lower sales volumes from South America, resulting from the sale of Candelaria and Ojos del Salado in fourth-quarter 2014 and lower production from Cerro Verde and El Abra.

Consolidated gold sales increased to 352 thousand ounces of gold in second-quarter 2015 and 615 thousand ounces for the first six months of 2015, compared with 159 thousand ounces in second-quarter 2014 and 346 thousand ounces for the first six months of 2014, primarily reflecting higher ore grades and operating rates at PT-FI. Consolidated molybdenum sales volumes decreased to 23 million pounds in second-quarter 2015 and 46 million pounds for the first six months of 2015, compared with 25 million pounds of molybdenum in second-quarter 2014 and 52 million pounds for the first six months of 2014, primarily reflecting slowing demand in the metallurgic market for molybdenum. Refer to “Operations” for further discussion of sales volumes at our mining operations.

Metals Realized Prices. Our consolidated revenues can vary significantly as a result of fluctuations in the market prices of copper, gold, molybdenum, silver and cobalt. As presented above in the summary operating data table, metals price realizations were lower for the second quarter and first six months of 2015, compared with the 2014 periods. Refer to "Markets" for further discussion.

Provisionally Priced Copper Sales. During the first six months of 2015, 41 percent of our mined copper was sold in concentrate, 33 percent as cathode and 26 percent as rod from North America operations. Impacts of net adjustments for prior period provisionally priced sales primarily relate to copper sales. Substantially all of our copper concentrate and cathode sales contracts provide final copper pricing in a specified future month (generally one to four months from the shipment date) based primarily on quoted LME monthly average spot copper prices. We receive market prices based on prices in the specified future period, which results in price fluctuations recorded through revenues until the date of settlement. We record revenues and invoice customers at the time of shipment based on then-current LME prices, which results in an embedded derivative on our provisionally priced concentrate and cathode sales that is adjusted to fair value through earnings each period, using the period-end forward prices, until final pricing on the date of settlement. To the extent final prices are higher or lower than what was recorded on a provisional basis, an increase or decrease to revenues is recorded each reporting period until the date of final pricing. Accordingly, in times of rising copper prices, our revenues benefit from adjustments to the final pricing of provisionally priced sales pursuant to contracts entered into in prior periods; in times of falling copper prices, the opposite occurs. The (unfavorable) favorable impacts of net adjustments to the prior periods' provisionally priced copper sales totaled $(20) million for second-quarter 2015 and $(106) million for the first six months of 2015, compared with $35 million for second-quarter 2014 and $(118) million for the first six months of 2014.

At June 30, 2015, we had provisionally priced copper sales at our copper mining operations, primarily South America and Indonesia, totaling 433 million pounds of copper (net of intercompany sales and noncontrolling interests) recorded at an average of $2.61 per pound, subject to final pricing over the next several months. We estimate that each $0.05 change in the price realized from the June 30, 2015, provisional price recorded would have an approximate $14 million effect on 2015 net income attributable to common stock. The LME spot copper price was $2.37 per pound on July 31, 2015.

Purchased Copper. We purchased copper cathode for processing by our Rod & Refining segment totaling 24 million pounds in second-quarter 2015 and 64 million for the first six months of 2015, compared with 34 million pounds in second-quarter 2014 and 66 million pounds for the first six months of 2014. Lower purchased copper revenues primarily reflect lower market prices for copper and lower sales volumes.

#### Oil and Gas Operations

Sales Volumes. Oil sales volumes of 8.6 million barrels (MMBbls) in second-quarter 2015 and 17.0 MMBbls for the first six months of 2015, were lower than sales volumes of 11.7 MMBbls in second-quarter 2014 and 23.5 MMBbls for the first six months of 2014, primarily reflecting the sale of the Eagle Ford properties in June 2014.

Realized Oil Prices and Derivative Contracts. Lower average realized prices for oil, excluding cash gains on derivative contracts, of $55.82 per barrel in second-quarter 2015 and $50.25 for the first six months of 2015, compared with $100.46 per barrel in second-quarter 2014 and $99.54 for the first six months of 2014, primarily reflected lower oil prices. Refer to “Operations” for further discussion of average realized prices and sales volumes at our oil and gas operations.

In connection with the acquisition of our oil and gas business, we have derivative contracts for 2015 consisting of crude oil options, and for 2014, had derivative contracts that consisted of crude oil options and natural gas swaps. These crude oil and natural gas derivative contracts are not designated as hedging instruments; accordingly, they are recorded at fair value with the mark-to-market gains and losses recorded in revenues each period. Cash gains (losses) on crude oil and natural gas derivative contracts totaled $101 million for second-quarter 2015 and $201 million for the first six months of 2015, compared with $(63) million for second-quarter 2014 and $(128) million for the first six months of 2014. Net noncash mark-to-market (losses) gains on crude oil and natural gas derivative contracts totaled $(95) million for second-quarter 2015 and $(143) million for the first six months of 2015, compared with $(7) million for second-quarter 2014 and $8 million for the first six months of 2014.

Following presents the estimated (decrease) increase in the net asset on our balance sheet of a 10 percent change in Brent crude oil prices on the fair values of outstanding crude oil derivative contracts, compared with forward prices used to determine the June 30, 2015, fair values (in millions):

|  | 10% Increase | 10% Decrease |
| --- | ---: | ---: |
| Crude oil options | $(37) | $18 |

Refer to Note 7 for further discussion of oil and natural gas derivative contracts.

### Production and Delivery Costs

Consolidated production and delivery costs totaled $2.8 billion in second-quarter 2015 and $5.8 billion for the first six months of 2015, compared with $3.1 billion in second-quarter 2014 and $5.8 billion for the first six months of 2014. Production and delivery costs for the 2015 periods, compared with the 2014 periods, primarily reflect lower costs at our South America mining operations as a result of the sale of the Candelaria and Ojos del Salado mines in fourth-quarter 2014, partly offset by higher costs at our North America mines related to higher production volumes.

Consolidated production and delivery costs included LCM adjustments primarily attributable to molybdenum inventories totaling $59 million for second-quarter 2015 and $63 million for the first six months of 2015. Refer to "Overview" for further discussion of potential additional LCM inventory adjustments and impairments for third-quarter 2015.

#### Mining Unit Site Production and Delivery Costs

Site production and delivery costs for our copper mining operations primarily include labor, energy and commodity-based inputs, such as sulphuric acid, reagents, liners, tires and explosives. Consolidated unit site production and delivery costs (before net noncash and other costs) for our copper mines totaled $1.85 per pound of copper in second-quarter 2015 and $1.89 for the first six months of 2015, compared with $1.99 per pound in second-quarter 2014 and $1.94 for the first six months of 2014. Lower consolidated average site production and delivery costs for the 2015 periods, compared with the 2014 periods, primarily reflected higher copper sales volumes in North America and Indonesia, partly offset by lower sales volumes in South America. Refer to “Operations – Unit Net Cash Costs” for further discussion of unit net cash costs associated with our operating divisions and to “Product Revenues and Production Costs” for reconciliations of per pound costs by operating division to production and delivery costs applicable to sales reported in our consolidated financial statements.

Assuming achievement of current volume and cost estimates, consolidated unit site production and delivery costs are expected to be lower in the second half of 2015 and average $1.81 per pound of copper for the year 2015, which is subject to change as a result of the comprehensive review of operating plans as further discussed in “Overview.”

#### Oil and Gas Cash Production Costs per BOE

Production costs for our oil and gas operations primarily include costs incurred to operate and maintain wells and related equipment and facilities, such as lease operating expenses, steam gas costs, electricity, production and ad valorem taxes, and gathering and transportation expenses. Cash production costs for our oil and gas operations of $19.04 per BOE in second-quarter 2015 were lower than cash production costs of $19.57 per BOE in second-quarter 2014, primarily reflecting lower cash production costs in California related to reductions in repair and maintenance costs and well workover expense, partly offset by higher average costs per BOE resulting from the sale of lower-cost Eagle Ford properties. Cash production costs of $19.62 per BOE for the first six months of 2015, were higher than $19.03 for the first six months of 2014, primarily reflecting the sale of lower-cost Eagle Ford properties, partly offset by lower cash production costs in California. Refer to “Operations” for further discussion of cash production costs at our oil and gas operations.

Assuming achievement of current volume and cost estimates for the remainder of 2015, cash production costs are expected to approximate $20 per BOE for the year 2015.

### Depreciation, Depletion and Amortization

Depreciation will vary under the unit-of-production (UOP) method as a result of changes in sales volumes and the related UOP rates at our mining and oil and gas operations. Consolidated depreciation, depletion and amortization (DD&A) totaled $890 million in second-quarter 2015 and $1.8 billion for first six months of 2015, compared with $1.0 billion in second-quarter 2014 and $2.0 billion for the first six months of 2014. DD&A in the 2015 periods, compared with the 2014 periods, reflected lower expense from our oil and gas operations associated with decreased production as a result of the sale of the Eagle Ford properties. Lower DD&A from our oil and gas operations for the first six months of 2015, compared with the first six months of 2014, was partly offset by higher DD&A from our mining operations mostly associated with higher sales volumes in North America and Indonesia.

### Impairment of Oil and Gas Properties

Under full cost accounting rules, a "ceiling test" is conducted each quarter to review the carrying value of our oil and gas properties for impairment. At June 30, 2015, and March 31, 2015, net capitalized costs with respect to FCX's proved U.S. oil and gas properties exceeded the related ceiling test limitation, which resulted in the recognition of impairment charges of $2.7 billion in second-quarter 2015 and $5.8 billion for the first six months of 2015, reflecting the lower twelve-month average of the first-day-of-the-month historical reference oil price and higher capitalized costs at such dates. Refer to Note 1 and "Operations - Oil and Gas" for further discussion, including discussion of potentially significant additional ceiling test impairments.

### Selling, General and Administrative Expenses

Consolidated selling, general and administrative expenses totaled $151 million in second-quarter 2015 and $305 million for the first six months of 2015, compared with $164 million in second-quarter 2014 and $299 million for the first six months of 2014. Consolidated selling, general and administrative expenses were net of capitalized general and administrative expense at our oil and gas operations, which totaled $38 million in second-quarter 2015 and $71 million for the first six months of 2015, compared with $40 million in second-quarter 2014 and $74 million for the first six months of 2014.

### Mining Exploration and Research Expenses

Consolidated exploration and research expenses for our mining operations totaled $36 million in second-quarter 2015 and $69 million for the first six months of 2015, compared with $34 million in second-quarter 2014 and $64 million for the first six months of 2014. Our exploration activities are generally near our existing mines with a focus on opportunities to expand reserves and resources to support development of additional future production capacity in the large mineral districts where we currently operate. Exploration results continue to indicate opportunities for what we believe could be significant future potential reserve additions in North and South America, and in the Tenke minerals district. The drilling data in North America also indicates the potential for significantly expanded sulfide production. Drilling results and exploration modeling in North America have identified large-scale potential sulfide resources in the Morenci and Safford/Lone Star districts, providing a long-term pipeline for future growth in reserves and production capacity in an established minerals district.

For the year 2015, mining exploration expenditures are expected to total approximately $110 million, which is subject to change as a result of the comprehensive review of operating plans as further discussed in “Overview.”

As further discussed in Note 1 of our annual report on Form 10-K for the year ended December 31, 2014, under the full cost method of accounting, exploration costs for our oil and gas operations are capitalized to oil and gas properties.

### Environmental Obligations and Shutdown Costs

Environmental obligation costs reflect net revisions to our long-term environmental obligations, which vary from period to period because of changes to environmental laws and regulations, the settlement of environmental matters and/or circumstances affecting our operations that could result in significant changes in our estimates. Shutdown costs include care and maintenance costs and any litigation, remediation or related expenditures associated with closed facilities or operations. Net charges for environmental obligations and shutdown costs totaled $11 million in second-quarter 2015 and $24 million for the first six months of 2015, compared with $76 million in second-quarter 2014 and $82 million for the first six months of 2014. Refer to "Contingencies" for further discussion of environmental obligations and litigation matters associated with closed facilities or operations.

### Net Gain on Sale of Assets

Net gain on sale of assets totaled $39 million for the first six months of 2015, primarily related to the January 2015 $140 million sale of our one-third interest in the Luna Energy power facility in New Mexico.

### Interest Expense, Net

Consolidated interest expense (excluding capitalized interest) totaled $215 million in second-quarter 2015 and $425 million for the first six months of 2015, compared with $225 million in second-quarter 2014 and $449 million for the first six months of 2014. Capitalized interest varies with the level of expenditures for our development projects and average interest rates on our borrowings, and totaled $66 million in second-quarter 2015 and $130 million for the first six months of 2015, compared with $61 million in second-quarter 2014 and $124 million for the first six months of 2014. Refer to "Operations" and “Capital Resources and Liquidity - Investing Activities” for further discussion of current development projects.

### Insurance and Other Third-party Recoveries

As further discussed in Note 9, in second-quarter 2015, we recognized a gain of $92 million associated with net proceeds received from insurers under FCX’s directors and officers liability insurance policies and other third parties in accordance with the settlement terms of shareholder derivative litigation.

### Income Taxes

Following is a summary of the approximate amounts used in the calculation of our consolidated income tax benefit (provision) for the 2015 and 2014 periods (in millions, except percentages):

|  | Six Months Ended June 30, 2015 Income(Loss)a |  | Effective Tax Rate |  | Income Tax (Provision) Benefit |  | Six Months Ended June 30, 2014 Income (Loss)a | Effective Tax Rate | Income Tax (Provision) Benefit |  |
| --- | ---: | --- | ---: | --- | ---: | --- | ---: | ---: | ---: | --- |
| U.S. | $(469) | b | 61% |  | $288 |  | $936 | 31% | $(291) | c |
| South America | 81 |  | 37% |  | (30) |  | 747 | 36% | (267) |  |
| Indonesia | 289 |  | 43% |  | (124) |  | (39) | 38% | 15 |  |
| Africa | 114 |  | 46% |  | (53) |  | 187 | 30% | (57) |  |
| Impairment of oil and gas properties | (5,790) |  | 38% |  | 2,179 |  | — | N/A | — |  |
| Valuation allowance | — |  | N/A |  | (763) | d | — | N/A | — |  |
| Eliminations and other | 187 |  | N/A |  | (28) |  | 138 | N/A | (37) |  |
| Annualized rate adjustmente | — |  | N/A |  | (87) |  | — | N/A | (48) |  |
| Consolidated FCX | $(5,588) |  | 25% | f | $1,382 |  | $1,969 | 35% | $(685) |  |

a. Represents income (loss) by geographic location before income taxes and equity in affiliated companies’ net earnings.

b. Includes a gain of $92 million related to net proceeds received from insurance carriers and other third parties related to a shareholder derivative litigation settlement for which there is no related tax provision.

c. Includes a $58 million charge for deferred taxes recorded in connection with the allocation of goodwill to the sale of Eagle Ford.

d. As a result of the impairment to oil and gas properties, we recorded a tax charge to establish a valuation allowance primarily against U.S. federal alternative minimum tax credits.

e. In accordance with applicable accounting rules, we adjust our interim provision for income taxes equal to our estimated annualized tax rate.

f. Our consolidated effective income tax rate is a function of the combined effective tax rates for the jurisdictions in which we operate. Accordingly, variations in the relative proportions of jurisdictional income result in fluctuations to our consolidated effective income tax rate. Assuming achievement of current sales volume and cost estimates and average prices of $2.50 per pound for copper, $1,150 per ounce for gold, $6 per pound for molybdenum and $56 per barrel of Brent crude oil for the second half of 2015, we estimated a tax benefit of $1.4 billion for 2015, substantially all of which relates to the impairment of oil and gas properties and resulting tax charge to establish a valuation allowance in the first half of 2015. See "Operations - Oil and Gas" for discussion regarding the likelihood of potentially significant ceiling charges during the remainder of 2015, which would give rise to additional tax benefits.

### OPERATIONS

### North America Copper Mines

We operate seven open-pit copper mines in North America – Morenci, Bagdad, Safford, Sierrita and Miami in Arizona, and Chino and Tyrone in New Mexico. All of the North America mining operations are wholly owned, except for Morenci. We record our 85 percent joint venture interest in Morenci using the proportionate consolidation method.

The North America copper mines include open-pit mining, sulfide ore concentrating, leaching and solution extraction/electrowinning (SX/EW) operations. A majority of the copper produced at our North America copper mines is cast into copper rod by our Rod & Refining segment. The remainder of our North America copper sales is in the form of copper cathode or copper concentrate, a portion of which is shipped to Atlantic Copper (our wholly owned smelter). Molybdenum concentrates and silver are also produced by certain of our North America copper mines.

As further discussed in “Overview,” we are currently reviewing operating plans at each of our copper and molybdenum mining operations and will revise operating and capital plans to strengthen our financial position in a weak copper price environment. The revised plans will target lower operating and capital costs to achieve maximum cash flow under the current market conditions. Production at certain operations challenged by low commodity prices will be curtailed. We expect to complete this review promptly and will report our revised plans during third-quarter

2015\. Accordingly, our sales volume and unit costs estimates discussed below are subject to change as a result of this review and other factors.

Operating and Development Activities. We have increased production from our North America copper mines by approximately 50 percent over the past five years and continue to evaluate a number of opportunities to add production capacity following positive exploration results. Future investments will be undertaken based on the results of economic and technical feasibility studies and market conditions.

*Morenci Mill Expansion.* The Morenci mill expansion project commenced operations in May 2014 and successfully achieved full rates in second-quarter 2015. The project expanded mill capacity from 50,000 metric tons of ore per day to approximately 115,000 metric tons of ore per day, which results in incremental annual production of approximately 225 million pounds of copper. Morenci's copper production is expected to average over 900 million pounds per year over the next five years. Additionally, the molybdenum circuit began production in first-quarter 2015. Remaining items associated with the project include construction of the expanded tailings storage facility, which is expected to be completed in the second half of 2015.

Operating Data. Following is summary operating data for the North America copper mines for the second quarters and first six months of 2015 and 2014:

| Operating Data, Net of Joint Venture Interest Copper (recoverable) | Three Months Ended June 30, 2015 | 2014 | Six Months Ended June 30, 2015 | 2014 |
| --- | ---: | ---: | ---: | ---: |
| Production (millions of pounds) | 469 | 395 | 921 | 780 |
| Sales (millions of pounds) | 486 | 423 | 958 | 794 |
| Average realized price per pound | $2.77 | $3.16 | $2.73 | $3.21 |
| Molybdenum (recoverable) |  |  |  |  |
| Production (millions of pounds)a | 10 | 9 | 19 | 17 |
| **100% Operating Data** |  |  |  |  |
| SX/EW operations |  |  |  |  |
| Leach ore placed in stockpiles (metric tons per day) | 890,000 | 1,044,500 | 902,500 | 1,014,000 |
| Average copper ore grade (percent) | 0.26 | 0.25 | 0.25 | 0.25 |
| Copper production (millions of recoverable pounds) | 261 | 234 | 508 | 463 |
| Mill operations |  |  |  |  |
| Ore milled (metric tons per day) | 316,000 | 260,100 | 308,800 | 257,700 |
| Average ore grade (percent): |  |  |  |  |
| Copper | 0.47 | 0.44 | 0.48 | 0.43 |
| Molybdenum | 0.03 | 0.03 | 0.03 | 0.03 |
| Copper recovery rate (percent) | 85.8 | 82.8 | 85.6 | 84.4 |
| Copper production (millions of recoverable pounds) | 247 | 188 | 488 | 370 |

a. Refer to "Consolidated Results" for our consolidated molybdenum sales volumes, which includes sales of molybdenum produced at the North America copper mines.

Copper sales volumes from our North America copper mines increased to 486 million pounds in second-quarter 2015 and 958 million pounds for the first six months of 2015, compared with 423 million pounds in second-quarter 2014 and 794 million pounds for the first six months of 2014, primarily reflecting higher milling rates at Morenci and Chino.

Copper sales from North America are expected to approximate 1.96 billion pounds for the year 2015, compared with 1.66 billion pounds in 2014.

Unit Net Cash Costs. Unit net cash costs per pound of copper is a measure intended to provide investors with information about the cash-generating capacity of our mining operations expressed on a basis relating to the primary metal product for our respective operations. We use this measure for the same purpose and for monitoring operating performance by our mining operations. This information differs from measures of performance determined in accordance with U.S. GAAP and should not be considered in isolation or as a substitute for measures of performance determined in accordance with U.S. GAAP. This measure is presented by other metals mining companies, although our measure may not be comparable to similarly titled measures reported by other companies.

#### Gross Profit per Pound of Copper and Molybdenum

The following table summarizes unit net cash costs and gross profit per pound at our North America copper mines for the second quarters and first six months of 2015 and 2014. Refer to “Product Revenues and Production Costs” for an explanation of the “by-product” and “co-product” methods and a reconciliation of unit net cash costs per pound to production and delivery costs applicable to sales reported in our consolidated financial statements.

|  | Three Months Ended June 30, 2015 By- Product Method Copper |  | Co-Product Method Molyb- denuma |  | Three Months Ended June 30, 2014 By- Product Method Copper Molyb- denuma | Co-Product Method |  |
| --- | ---: | --- | ---: | ---: | ---: | ---: | ---: |
| Revenues, excluding adjustments | $2.77 |  | $2.77 | $7.80 | $3.16 | $3.16 | $12.49 |
| Site production and delivery, before net noncash and other costs shown below | 1.78 |  | 1.66 | 6.24 | 1.87 | 1.74 | 6.73 |
| By-product credits | (0.16) |  | — | — | (0.28) | — | — |
| Treatment charges | 0.12 |  | 0.12 | — | 0.11 | 0.11 | — |
| Unit net cash costs | 1.74 |  | 1.78 | 6.24 | 1.70 | 1.85 | 6.73 |
| Depreciation, depletion and amortization | 0.28 |  | 0.27 | 0.53 | 0.30 | 0.28 | 0.64 |
| Noncash and other costs, net | 0.10 | b | 0.09 | 0.06 | 0.07 | 0.06 | 0.05 |
| Total unit costs | 2.12 |  | 2.14 | 6.83 | 2.07 | 2.19 | 7.42 |
| Revenue adjustments, primarily for pricing on prior period open sales | (0.03) |  | (0.03) | — | 0.02 | 0.02 | — |
| Gross profit per pound | $0.62 |  | $0.60 | $0.97 | $1.11 | $0.99 | $5.07 |
| Copper sales (millions of recoverable pounds) | 485 |  | 485 |  | 421 | 421 |  |
| Molybdenum sales (millions of recoverable pounds)a |  |  |  | 10 |  |  | 9 |

|  | Six Months Ended June 30, 2015 By- Product Method Copper |  | Co-Product Method Molyb- denuma |  | Six Months Ended June 30, 2014 By- Product Method Copper Molyb- denuma | Co-Product Method |  |
| --- | ---: | --- | ---: | ---: | ---: | ---: | ---: |
| Revenues, excluding adjustments | $2.73 |  | $2.73 | $8.28 | $3.21 | $3.21 | $11.39 |
| Site production and delivery, before net noncash and other costs shown below | 1.79 |  | 1.68 | 6.24 | 1.87 | 1.76 | 6.45 |
| By-product credits | (0.17) |  | — | — | (0.25) | — | — |
| Treatment charges | 0.13 |  | 0.12 | — | 0.12 | 0.12 | — |
| Unit net cash costs | 1.75 |  | 1.80 | 6.24 | 1.74 | 1.88 | 6.45 |
| Depreciation, depletion and amortization | 0.28 |  | 0.27 | 0.58 | 0.29 | 0.27 | 0.58 |
| Noncash and other costs, net | 0.08 | b | 0.08 | 0.06 | 0.08 | 0.07 | 0.04 |
| Total unit costs | 2.11 |  | 2.15 | 6.88 | 2.11 | 2.22 | 7.07 |
| Revenue adjustments, primarily for pricing on prior period open sales | (0.03) |  | (0.03) | — | (0.01) | (0.01) | — |
| Gross profit per pound | $0.59 |  | $0.55 | $1.40 | $1.09 | $0.98 | $4.32 |
| Copper sales (millions of recoverable pounds) | 956 |  | 956 |  | 790 | 790 |  |
| Molybdenum sales (millions of recoverable pounds)a |  |  |  | 19 |  |  | 17 |

a. Reflects sales of molybdenum produced by certain of the North America copper mines to our molybdenum sales company at market-based pricing.

b. Includes charges for LCM inventory adjustments totaling $0.02 per pound for second-quarter 2015 and $0.01 per pound for the first six months of 2015.

Our North America copper mines have varying cost structures because of differences in ore grades and characteristics, processing costs, by-product credits and other factors. Average unit net cash costs (net of by-product credits) of $1.74 per pound of copper in second-quarter 2015 and $1.75 per pound for the first six months of 2015, were higher than unit net cash costs of $1.70 per pound in second-quarter 2014 and $1.74 per pound for the first six months of 2014, primarily reflecting lower by-product credits, partly offset by higher copper sales volumes.

Because certain assets are depreciated on a straight-line basis, North America's average unit depreciation rate may vary with asset additions and the level of copper production and sales.

Assuming achievement of current sales volume and cost estimates, and an average price of $6 per pound of molybdenum for the second half of 2015, average unit net cash costs (net of by-product credits) for our North America copper mines are expected to approximate $1.72 per pound of copper for the year 2015, compared with $1.73 per pound in 2014. North America's unit net cash costs would change by approximately $0.02 per pound for each $2 per pound change in the average price of molybdenum for the second half of 2015.

### South America Mining

We operate two copper mines in South America – Cerro Verde in Peru (in which we own a 53.56 percent interest) and El Abra in Chile (in which we own a 51 percent interest). These operations in South America are consolidated in our financial statements.

On November 3, 2014, FCX completed the sale of its ownership interests in the Candelaria and Ojos del Salado mines in Chile.

South America mining includes open-pit mining, sulfide ore concentrating, leaching and SX/EW operations. Production from our South America mines is sold as copper concentrate or copper cathode under long-term contracts. Our South America mines also ship a portion of their copper concentrate inventories to Atlantic Copper. In addition to copper, the Cerro Verde mine produces molybdenum concentrates and silver.

As further discussed in “Overview,” we are currently reviewing operating plans at each of our copper and molybdenum mining operations and will revise operating and capital plans to strengthen our financial position in a weak copper price environment. The revised plans will target lower operating and capital costs to achieve maximum cash flow under the current market conditions. Production at certain operations challenged by low commodity prices will be curtailed. We expect to complete this review promptly and will report our revised plans during third-quarter 2015. Accordingly, our sales volume and unit costs estimates discussed below are subject to change as a result of this review and other factors.

#### Development Activities.

*Cerro Verde Expansion.* Construction activities associated with a large-scale expansion at Cerro Verde are advancing on schedule toward completion in late 2015. Detailed engineering and major procurement activities are complete and construction is more than 87 percent complete. The project will expand the concentrator facilities from 120,000 metric tons of ore per day to 360,000 metric tons of ore per day and provide incremental annual production of approximately 600 million pounds of copper and 15 million pounds of molybdenum beginning in 2016. As of June 30, 2015, $3.9 billion had been incurred for this project ($0.8 billion during the first six months of 2015), with approximately $0.7 billion remaining to be incurred.

*El Abra Sulfide.* We continue to evaluate a potential large-scale milling operation at El Abra to process additional sulfide material and to achieve higher recoveries. Exploration results in recent years at El Abra indicate a significant sulfide resource, which could potentially support a major mill project. Future investments will depend on technical studies, economic factors and global copper market conditions.

Operating Data. Following is summary operating data for our South America mining operations for the second quarters and first six months of 2015 and 2014:

| Copper (recoverable) | Three Months Ended June 30, 2015 | 2014a | Six Months Ended June 30, 2015 | 2014a |
| --- | ---: | ---: | ---: | ---: |
| Production (millions of pounds) | 188 | 300 | 381 | 614 |
| Sales (millions of pounds) | 178 | 310 | 378 | 617 |
| Average realized price per pound | $2.69 | $3.17 | $2.68 | $3.16 |
| Gold (recoverable) |  |  |  |  |
| Production (thousands of ounces) | — | 21 | — | 42 |
| Sales (thousands of ounces) | — | 20 | — | 43 |
| Average realized price per ounce | $— | $1,302 | $— | $1,302 |
| Molybdenum (millions of recoverable pounds) |  |  |  |  |
| Productionb | 2 | 2 | 4 | 5 |
| SX/EW operations |  |  |  |  |
| Leach ore placed in stockpiles (metric tons per day) | 237,000 | 281,700 | 235,300 | 284,200 |
| Average copper ore grade (percent) | 0.41 | 0.52 | 0.41 | 0.51 |
| Copper production (millions of recoverable pounds) | 109 | 125 | 223 | 248 |
| Mill operations |  |  |  |  |
| Ore milled (metric tons per day) | 116,500 | 182,200 | 117,900 | 185,500 |
| Average ore grade: |  |  |  |  |
| Copper (percent) | 0.46 | 0.56 | 0.45 | 0.58 |
| Molybdenum (percent) | 0.01 | 0.02 | 0.02 | 0.02 |
| Gold (grams per metric ton) | — | 0.11 | — | 0.11 |
| Copper recovery rate (percent) | 78.2 | 88.7 | 78.9 | 89.4 |
| Copper production (millions of recoverable pounds) | 79 | 175 | 158 | 366 |

a. The 2014 periods include the results of the Candelaria and Ojos del Salado mines, which were sold in November 2014 and had sales volumes totaling 80 million pounds of copper and 20 thousand ounces of gold in second-quarter 2015 and 174 million pounds of copper and 43 thousand ounces of gold for the first six months of 2014.

b. Refer to "Consolidated Results" for our consolidated molybdenum sales volumes, which include sales of molybdenum produced at Cerro Verde.

Consolidated copper sales volumes from South America of 178 million pounds in second-quarter 2015 and 378 million pounds for the first six months of 2015 were lower than sales of 310 million pounds in second-quarter 2014 and 617 million pounds for the first six months of 2014, reflecting the sale of the Candelaria and Ojos del Salado mines and lower production from Cerro Verde and El Abra primarily associated with lower ore grades and recovery rates.

For the year 2015, consolidated sales volumes from South America mines are expected to approximate 900 million pounds of copper, compared with 1.14 billion pounds in 2014, which included copper sales volumes of 268 million pounds from the Candelaria and Ojos del Salado mines.

Unit Net Cash Costs. Unit net cash costs per pound of copper is a measure intended to provide investors with information about the cash-generating capacity of our mining operations expressed on a basis relating to the primary metal product for our respective operations. We use this measure for the same purpose and for monitoring operating performance by our mining operations. This information differs from measures of performance determined in accordance with U.S. GAAP and should not be considered in isolation or as a substitute for measures of performance determined in accordance with U.S. GAAP. This measure is presented by other metals mining companies, although our measure may not be comparable to similarly titled measures reported by other companies.

#### Gross Profit per Pound of Copper

The following table summarizes unit net cash costs and gross profit per pound of copper at the South America mining operations for the second quarters and first six months of 2015 and 2014. Unit net cash costs per pound of copper are reflected under the by-product and co-product methods as the South America mining operations also had small amounts of molybdenum, gold and silver sales. Refer to “Product Revenues and Production Costs” for an explanation of the “by-product” and “co-product” methods and a reconciliation of unit net cash costs per pound to production and delivery costs applicable to sales reported in our consolidated financial statements.

|  | Three Months Ended June 30, 2015 By-Product Method | Co-Product Method | Three Months Ended June 30, 2014 By-Product Method |  | Co-Product Method |
| --- | ---: | ---: | ---: | --- | ---: |
| Revenues, excluding adjustments | $2.69 | $2.69 | $3.17 |  | $3.17 |
| Site production and delivery, before net noncash and other costs shown below | 1.77 | 1.72 | 1.64 |  | 1.52 |
| By-product credits | (0.04) | — | (0.23) |  | — |
| Treatment charges | 0.17 | 0.17 | 0.18 |  | 0.18 |
| Royalty on metals | — | — | 0.01 |  | 0.01 |
| Unit net cash costs | 1.90 | 1.89 | 1.60 | a | 1.71 |
| Depreciation, depletion and amortization | 0.40 | 0.39 | 0.30 |  | 0.29 |
| Noncash and other (credits) costs, net | (0.02) | (0.03) | 0.08 |  | 0.06 |
| Total unit costs | 2.28 | 2.25 | 1.98 |  | 2.06 |
| Revenue adjustments, primarily for pricing on prior period open sales | (0.05) | (0.05) | 0.10 |  | 0.10 |
| Gross profit per pound | $0.36 | $0.39 | $1.29 |  | $1.21 |
| Copper sales (millions of recoverable pounds) | 178 | 178 | 310 |  | 310 |

|  | Six Months Ended June 30, 2015 By-Product Method | Co-Product Method | Six Months Ended June 30, 2014 By-Product Method |  | Co-Product Method |
| --- | ---: | ---: | ---: | --- | ---: |
| Revenues, excluding adjustments | $2.68 | $2.68 | $3.16 |  | $3.16 |
| Site production and delivery, before net noncash and other costs shown below | 1.76 | 1.70 | 1.57 |  | 1.46 |
| By-product credits | (0.06) | — | (0.24) |  | — |
| Treatment charges | 0.17 | 0.17 | 0.18 |  | 0.18 |
| Royalty on metals | — | — | — |  | — |
| Unit net cash costs | 1.87 | 1.87 | 1.51 | a | 1.64 |
| Depreciation, depletion and amortization | 0.39 | 0.38 | 0.29 |  | 0.27 |
| Noncash and other costs, net | — | — | 0.07 |  | 0.06 |
| Total unit costs | 2.26 | 2.25 | 1.87 |  | 1.97 |
| Revenue adjustments, primarily for pricing on prior period open sales | (0.08) | (0.08) | (0.11) |  | (0.11) |
| Gross profit per pound | $0.34 | $0.35 | $1.18 |  | $1.08 |
| Copper sales (millions of recoverable pounds) | 378 | 378 | 617 |  | 617 |

a. Excluding the results of Candelaria and Ojos del Salado, South America mining's unit net cash costs for second-quarter 2014 averaged $1.55 per pound and $1.51 for the first six months of 2014.

Our South America mines have varying cost structures because of differences in ore grades and characteristics, processing costs, by-product credits and other factors. Average unit net cash costs (net of by-product credits) of $1.90 per pound of copper in second-quarter 2015 and $1.87 per pound for the first six months of 2015 were higher than unit net cash costs of $1.60 per pound in second-quarter 2014 and $1.51 per pound for the first six months of 2014, primarily reflecting lower sales volumes and lower by-product credits. Lower by-product credits were mostly because of the sale of Candelaria and Ojos del Salado in fourth-quarter 2014.

Because certain assets are depreciated on a straight-line basis, South America's unit depreciation rate may vary with asset additions and the level of copper production and sales.

Revenue adjustments primarily result from changes in prices on provisionally priced copper sales recognized in prior periods. Refer to “Consolidated Results - Revenues” for further discussion of adjustments to prior period provisionally priced copper sales.

Assuming achievement of current sales volume and cost estimates, and average prices of $6 per pound of molybdenum for the second half of 2015, we estimate that average unit net cash costs (net of by-product credits) for our South America mining operations would approximate $1.75 per pound of copper for the year 2015, compared with $1.58 per pound in 2014.

### Indonesia Mining

Indonesia mining includes PT-FI’s Grasberg minerals district, one of the world's largest copper and gold deposits, in Papua, Indonesia. We own 90.64 percent of PT-FI, including 9.36 percent owned through our wholly owned subsidiary, PT Indocopper Investama.

PT-FI proportionately consolidates an unincorporated joint venture with Rio Tinto plc (Rio Tinto), under which Rio Tinto has a 40 percent interest in certain assets and a 40 percent interest through 2021 in production exceeding specified annual amounts of copper, gold and silver. After 2021, all production and related revenues and costs are shared 60 percent PT-FI and 40 percent Rio Tinto. Refer to Note 3 in our annual report on Form 10-K for the year ended December 31, 2014, for discussion of our joint venture with Rio Tinto.

PT-FI produces copper concentrates that contain significant quantities of gold and silver. Substantially all of PT-FI’s copper concentrates are sold under long-term contracts, and during the first six months of 2015, approximately one-half of PT-FI's copper concentrates was sold to PT Smelting, our 25 percent owned smelter and refinery in Gresik. In July 2015, PT Smelting's operations were temporarily suspended pending completion of required repairs, which are expected to be completed in September 2015.

PT-FI has commenced discussions with union officials regarding its bi-annual labor agreement, which is scheduled for renewal in September 2015.

As further discussed in “Overview,” we are currently reviewing operating plans at each of our copper and molybdenum mining operations and will revise operating and capital plans to strengthen our financial position in a weak copper price environment. The revised plans will target lower operating and capital costs to achieve maximum cash flow under the current market conditions. Production at certain operations challenged by low commodity prices will be curtailed. We expect to complete this review promptly and will report our revised plans during third-quarter 2015. Accordingly, our sales volume and unit costs estimates discussed below are subject to change as a result of this review and other factors.

Regulatory Matters. In January 2014, the Indonesian government published regulations that among other things imposed a progressive export duty on copper concentrates. Despite PT-FI’s rights under its Contract of Work (COW) to export concentrates without the payment of duties, PT-FI was unable to obtain administrative approval for exports and operated at approximately half of its capacity from mid-January 2014 through July 2014.

In July 2014, PT-FI entered into a Memorandum of Understanding (MOU) with the Indonesian government. Under the MOU, PT-FI provided a $115 million assurance bond to support its commitment for smelter development, agreed to increased royalty rates and agreed to pay export duties (which were set at 7.5 percent, declining to 5.0 percent when smelter development progress exceeds 7.5 percent and are eliminated when development progress exceeds 30 percent). The MOU also anticipated an amendment of the COW within six months to address other matters; however, no terms of the COW other than those relating to the smelter bond, increased royalties and export duties were changed. In January 2015, the MOU was extended to July 25, 2015, and it expired on that date. The increased royalty rates, export duties and smelter assurance bond remain in effect.

PT-FI is also required to apply for renewal of export permits at six-month intervals. On July 29, 2015, PT-FI's export permit was renewed through January 28, 2016. In connection with the renewal, export duties were reduced to 5.0 percent, as a result of smelter development progress.

In April 2015, the Indonesian government instituted a requirement that all export sales of concentrates must be arranged through letters of credit with payments received through a foreign exchange bank located in Indonesia. Under the COW, PT-FI is not required to obtain letters of credit in connection with its sales, and PT-FI requested an exemption from the new requirement. The Minister of Trade granted an initial exemption through July 25, 2015. If this exemption is not renewed, shipments could be delayed for a short period of time and additional costs could be incurred.

PT-FI continues to engage in active discussions with the Indonesian government regarding its COW and long-term operating rights. Negotiations are taking into consideration PT-FI's requirement for assurance of legal and fiscal terms post-2021 for PT-FI to continue with its large-scale investment program in Papua, Indonesia.

PT-FI is advancing plans for the construction of new smelter capacity in parallel with completing negotiations on its COW and long-term operating rights. PT-FI has identified potential sites for the construction of additional smelter capacity and is in discussions with potential partners for the project.

We expect, but cannot provide any assurance, that PT-FI will be successful in reaching a satisfactory agreement on the terms of its long-term mining rights. If PT-FI is unable to reach agreement with the Indonesian government on its long-term rights, we may be required to reduce or defer investments in underground development projects, which could have a material adverse effect on PT-FI’s future production and reserves. In addition, PT-FI would intend to pursue any and all claims against the Indonesian government for breach of contract through international arbitration.

Refer to Note 13 in our annual report on Form 10-K for the year ended December 31, 2014, for further discussion of our Indonesia mining contract. For additional discussion of risks associated with our operations in Indonesia, including labor matters and the COW, refer to "Risk Factors" contained in Part I, Item 1A. of our annual report on Form 10-K for the year ended December 31, 2014.

Operating and Development Activities. We have several projects in progress in the Grasberg minerals district related to the development of large-scale, long-lived, high-grade underground ore bodies. In aggregate, these underground ore bodies are expected to ramp up over several years to process approximately 240,000 metric tons of ore per day following the transition from the Grasberg open pit, currently anticipated to occur in late 2017. Development of the Grasberg Block Cave and Deep Mill Level Zone (DMLZ) underground mines is advancing to enable DMLZ to commence production in late 2015 and the Grasberg Block Cave mine to commence production in 2018. Over the next five years, estimated aggregate capital spending on these projects is expected to average $0.8 billion per year ($0.7 billion per year net to PT-FI). Additionally, over the next five years, estimated aggregate capital spending for processing and power facilities to optimize the handling of underground ore is expected to average $0.3 billion per year. Considering the long-term nature and size of these projects, actual costs could vary from these estimates. PT-FI may reduce or defer these activities pending resolution of negotiations regarding the COW.

The following provides additional information on the continued development of the Common Infrastructure project, the Grasberg Block Cave underground mine and the DMLZ ore body that lies below the Deep Ore Zone (DOZ) underground mine.

*Common Infrastructure and Grasberg Block Cave Mine.* In 2004, PT-FI commenced its Common Infrastructure project to provide access to its large undeveloped underground ore bodies located in the Grasberg minerals district through a tunnel system located approximately 400 meters deeper than its existing underground tunnel system. In addition to providing access to our underground ore bodies, the tunnel system will enable PT-FI to conduct future exploration in prospective areas associated with currently identified ore bodies. The tunnel system was completed to the Big Gossan terminal, and the Big Gossan mine was brought into production in 2010. Production from the Big Gossan mine is currently suspended and expected to restart production in the second half of 2016. Development of the DMLZ and Grasberg Block Cave underground mines is advancing using the Common Infrastructure project tunnels as access.

The Grasberg Block Cave underground mine accounts for more than 40 percent of our recoverable proven and probable reserves in Indonesia. Production at the Grasberg Block Cave mine is expected to commence in early 2018, at the end of mining the Grasberg open pit. Targeted production rates once the Grasberg Block Cave mining operation reaches full capacity are expected to approximate 160,000 metric tons of ore per day.

Aggregate mine development capital for the Grasberg Block Cave mine and associated Common Infrastructure is expected to approximate $5.7 billion (incurred between 2008 and 2021), with PT-FI’s share totaling approximately $5.1 billion. Aggregate project costs totaling $2.0 billion have been incurred through June 30, 2015 ($0.2 billion during the first six months of 2015).

*DMLZ.* The DMLZ ore body lies below the DOZ mine at the 2,590-meter elevation and represents the downward continuation of mineralization in the Ertsberg East Skarn system and neighboring Ertsberg porphyry. We plan to mine the ore body using a block-cave method with production beginning in late 2015. Targeted production rates once the DMLZ mining operation reaches full capacity are expected to approximate 80,000 metric tons of ore per day. Drilling efforts continue to determine the extent of this ore body. Aggregate mine development capital costs for the DMLZ mine are expected to approximate $2.7 billion (incurred between 2009 and 2020), with PT-FI’s share totaling approximately $1.6 billion. Aggregate project costs totaling $1.3 billion have been incurred through June 30, 2015 ($0.2 billion during the first six months of 2015).

Operating Data. Following is summary operating data for our Indonesia mining operations for the second quarters and first six months of 2015 and 2014:

| Operating Data, Net of Joint Venture Interest Copper (recoverable) | Three Months Ended June 30, 2015 | 2014 | Six Months Ended June 30, 2015 | 2014 |
| --- | ---: | ---: | ---: | ---: |
| Production (millions of pounds) | 205 | 122 | 359 | 262 |
| Sales (millions of pounds) | 196 | 117 | 351 | 226 |
| Average realized price per pound | $2.61 | $3.19 | $2.66 | $3.15 |
| Gold (thousands of recoverable ounces) |  |  |  |  |
| Production (thousands of ounces) | 360 | 142 | 615 | 350 |
| Sales (thousands of ounces) | 346 | 135 | 606 | 297 |
| Average realized price per ounce | $1,173 | $1,294 | $1,183 | $1,299 |
| **100% Operating Data** |  |  |  |  |
| Ore milled (metric tons per day):a |  |  |  |  |
| Grasberg open pit | 134,200 | 50,700 | 121,200 | 58,200 |
| DOZ underground mineb | 42,700 | 50,500 | 45,800 | 50,400 |
| Big Gossan underground minec | — | 1,700 | — | 1,800 |
| Total | 176,900 | 102,900 | 167,000 | 110,400 |
| Average ore grades: |  |  |  |  |
| Copper (percent) | 0.67 | 0.73 | 0.63 | 0.72 |
| Gold (grams per metric ton) | 0.86 | 0.65 | 0.78 | 0.72 |
| Recovery rates (percent): |  |  |  |  |
| Copper | 90.6 | 89.0 | 90.6 | 88.7 |
| Gold | 83.5 | 76.3 | 83.9 | 78.1 |
| Production (recoverable): |  |  |  |  |
| Copper (millions of pounds) | 205 | 125 | 359 | 269 |
| Gold (thousands of ounces) | 360 | 142 | 615 | 351 |

a. Amounts represent the approximate average daily throughput processed at PT-FI’s mill facilities from each producing mine.

b. Ore milled from the DOZ underground mine is expected to ramp up to 70,000 metric tons of ore per day in the second half of 2015.

c. Production from the Big Gossan underground mine is expected to restart in the second half of 2016 and ramp up to 7,000 metric tons of ore per day in 2018.

Indonesia's sales volumes increased to 196 million pounds of copper and 346 thousand ounces of gold in second-quarter 2015 and 351 million pounds of copper and 606 thousand ounces of gold for the first six months of 2015, compared with 117 million pounds of copper and 135 thousand ounces of gold in second-quarter 2014 and 226 million pounds of copper and 297 thousand ounces of gold for the first six months of 2014, primarily reflecting higher operating rates and higher ore grades for gold.

At the Grasberg mine, the sequencing of mining areas with varying ore grades causes fluctuations in quarterly and annual production of copper and gold. PT-FI expects ore grades to increase beginning in fourth-quarter 2015 through 2017 as high-grade sections of the Grasberg open pit are mined. Consolidated sales volumes from our Indonesia mining operations are expected to approximate 860 million pounds of copper and 1.3 million ounces of gold for the year 2015, compared with 664 million pounds of copper and 1.2 million ounces of gold for the year 2014.

Unit Net Cash Costs. Unit net cash costs per pound of copper is a measure intended to provide investors with information about the cash-generating capacity of our mining operations expressed on a basis relating to the primary metal product for our respective operations. We use this measure for the same purpose and for monitoring operating performance by our mining operations. This information differs from measures of performance determined in accordance with U.S. GAAP and should not be considered in isolation or as a substitute for measures of performance determined in accordance with U.S. GAAP. This measure is presented by other metals mining companies, although our measure may not be comparable to similarly titled measures reported by other companies.

#### Gross Profit (Loss) per Pound of Copper and per Ounce of Gold

The following table summarizes the unit net cash costs and gross profit (loss) per pound of copper and per ounce of gold at our Indonesia mining operations for the second quarters and first six months of 2015 and 2014. Refer to “Production Revenues and Production Costs” for an explanation of “by-product” and “co-product” methods and a reconciliation of unit net cash costs per pound to production and delivery costs applicable to sales reported in our consolidated financial statements.

|  | Three Months Ended June 30, 2015 By-Product Method Copper |  | Co-Product Method Gold | Copper | Three Months Ended June 30, 2014 By-Product Method Gold |  | Co-Product Method |  |
| --- | ---: | --- | ---: | ---: | ---: | --- | ---: | ---: |
| Revenues, excluding adjustments | $2.61 |  | $2.61 | $1,173 | $3.19 |  | $3.19 | $1,294 |
| Site production and delivery, before net noncash and other costs shown below | 2.26 |  | 1.25 | 560 | 3.86 | a | 2.59 | 1,050 |
| Gold and silver credits | (2.13) |  | — | — | (1.57) |  | — | — |
| Treatment charges | 0.32 |  | 0.18 | 79 | 0.26 |  | 0.17 | 70 |
| Export duties | 0.18 |  | 0.10 | 45 | — |  | — | — |
| Royalty on metals | 0.18 | b | 0.10 | 45 | 0.11 |  | 0.08 | 31 |
| Unit net cash costs | 0.81 |  | 1.63 | 729 | 2.66 |  | 2.84 | 1,151 |
| Depreciation and amortization | 0.40 |  | 0.22 | 100 | 0.47 |  | 0.31 | 127 |
| Noncash and other costs, net | 0.04 |  | 0.02 | 10 | 0.55 | a | 0.37 | 151 |
| Total unit costs | 1.25 |  | 1.87 | 839 | 3.68 |  | 3.52 | 1,429 |
| Revenue adjustments, primarily for pricing on prior period open sales | (0.02) |  | (0.02) | 7 | 0.09 |  | 0.09 | 5 |
| PT Smelting intercompany (loss) profit | (0.02) |  | (0.01) | (5) | 0.03 |  | 0.02 | 9 |
| Gross profit (loss) per pound/ounce | $1.32 |  | $0.71 | $336 | $(0.37) |  | $(0.22) | $(121) |
| Copper sales (millions of recoverable pounds) | 196 |  | 196 |  | 117 |  | 117 |  |
| Gold sales (thousands of recoverable ounces) |  |  |  | 346 |  |  |  | 135 |

52

|  | Six Months Ended June 30, 2015 By-Product Method Copper |  | Co-Product Method Gold |  | Six Months Ended June 30, 2014 By-Product Method Copper Gold |  | Co-Product Method |  |
| --- | ---: | --- | ---: | ---: | ---: | --- | ---: | ---: |
| Revenues, excluding adjustments | $2.66 |  | $2.66 | $1,183 | $3.15 |  | $3.15 | $1,299 |
| Site production and delivery, before net noncash and other costs shown below | 2.51 |  | 1.41 | 626 | 3.60 | a | 2.31 | 950 |
| Gold and silver credits | (2.11) |  | — | — | (1.85) |  | — | — |
| Treatment charges | 0.31 |  | 0.17 | 77 | 0.25 |  | 0.16 | 65 |
| Export duties | 0.16 |  | 0.09 | 41 | — |  | — | — |
| Royalty on metals | 0.17 | b | 0.10 | 42 | 0.12 |  | 0.07 | 31 |
| Unit net cash costs | 1.04 |  | 1.77 | 786 | 2.12 |  | 2.54 | 1,046 |
| Depreciation and amortization | 0.42 |  | 0.24 | 106 | 0.45 |  | 0.29 | 120 |
| Noncash and other costs, net | 0.04 |  | 0.02 | 10 | 0.61 | a | 0.39 | 161 |
| Total unit costs | 1.50 |  | 2.03 | 902 | 3.18 |  | 3.22 | 1,327 |
| Revenue adjustments, primarily for pricing on prior period open sales | (0.15) |  | (0.15) | 14 | (0.24) |  | (0.24) | 59 |
| PT Smelting intercompany profit | 0.01 |  | 0.01 | 2 | 0.26 |  | 0.16 | 68 |
| Gross profit (loss) per pound/ounce | $1.02 |  | $0.49 | $297 | $(0.01) |  | $(0.15) | $99 |
| Copper sales (millions of recoverable pounds) | 351 |  | 351 |  | 226 |  | 226 |  |
| Gold sales (thousands of recoverable ounces) |  |  |  | 606 |  |  |  | 297 |

a. Fixed costs totaling $0.48 per pound of copper charged directly to cost of sales as a result of the impact of export restrictions on PT-FI's operating rates are excluded from site production and delivery and included in net noncash and other costs for the second quarter and first six months of 2014.

b. Includes $0.07 per pound of copper for the second quarter and first six months of 2015 associated with PT-FI's increased royalty rates.

A significant portion of PT-FI's costs are fixed and unit costs vary depending on sales volumes. Indonesia's unit net cash costs (net of gold and silver credits) totaled $0.81 per pound of copper in second-quarter 2015 and $1.04 per pound of copper for the first six months of 2015, compared with $2.66 per pound in second-quarter 2014 and $2.12 per pound of copper for the first six months of 2014, primarily reflecting higher gold and silver credits and higher copper sales volumes, partly offset by the impact of export duties and increased royalty rates.

Treatment charges vary with the volume of metals sold and the price of copper, and royalties vary with the volume of metals sold and the prices of copper and gold.

Because certain assets are depreciated on a straight-line basis, PT-FI’s unit depreciation rate varies with the level of copper production and sales.

Revenue adjustments primarily result from changes in prices on provisionally priced copper sales recognized in prior periods. Refer to “Consolidated Results - Revenues” for further discussion of adjustments to prior period provisionally priced copper sales.

PT Smelting intercompany profit represents the change in the deferral of 25 percent of PT-FI's profit on sales to PT Smelting. Refer to "Operations - Smelting & Refining" for further discussion.

Based on current sales volume and cost estimates, and assuming an average gold price of $1,150 per ounce for the second half of 2015, Indonesia's unit net cash costs (net of gold and silver credits) are expected to approximate $1.08 per pound of copper for the year 2015, compared with $1.06 for the year 2014. Indonesia's projected unit net cash costs would change by approximately $0.05 per pound for each $50 per ounce change in the average price of gold for the second half of 2015. Because of the fixed nature of a large portion of Indonesia's costs, unit costs vary from quarter to quarter depending on copper and gold volumes.

### Africa Mining

Africa mining includes the Tenke minerals district. We hold an effective 56 percent interest in the Tenke copper and cobalt mining concessions in the Katanga province of the DRC through our consolidated subsidiary Tenke Fungurume Mining S.A. (TFM), and we are the operator of Tenke.

The Tenke operation includes open-pit mining, leaching and SX/EW operations. Copper production from the Tenke minerals district is sold as copper cathode. In addition to copper, the Tenke minerals district produces cobalt hydroxide.

As further discussed in “Overview,” we are currently reviewing operating plans at each of our copper and molybdenum mining operations and will revise operating and capital plans to strengthen our financial position in a weak copper price environment. The revised plans will target lower operating and capital costs to achieve maximum cash flow under the current market conditions. Production at certain operations challenged by low commodity prices will be curtailed. We expect to complete this review promptly and will report our revised plans during third-quarter 2015. Accordingly, our sales volume and unit costs estimates discussed below are subject to change as a result of this review and other factors.

Operating and Development Activities. TFM completed its second phase expansion project in early 2013, which included increasing mine, mill and processing capacity. Construction of a second sulphuric acid plant is under way, with completion expected in the first half of 2016. We continue to engage in exploration activities and metallurgical testing to evaluate the potential of the highly prospective minerals district at Tenke. These analyses are being incorporated in future plans for potential expansions of production capacity. Future expansions are subject to a number of factors, including power availability, economic and market conditions, and the business and investment climate in the DRC.

Operating Data. Following is summary operating data for our Africa mining operations for the second quarters and first six months of 2015 and 2014:

| Copper (recoverable) | Three Months Ended June 30, 2015 | 2014 | Six Months Ended June 30, 2015 | 2014 |
| --- | ---: | ---: | ---: | ---: |
| Production (millions of pounds) | 115 | 114 | 231 | 223 |
| Sales (millions of pounds) | 104 | 118 | 237 | 202 |
| Average realized price per pounda | $2.63 | $3.08 | $2.66 | $3.08 |
| Cobalt (contained) |  |  |  |  |
| Production (millions of pounds) | 9 | 7 | 16 | 14 |
| Sales (millions of pounds) | 8 | 7 | 16 | 15 |
| Average realized price per pound | $9.27 | $9.58 | $9.23 | $9.29 |
| Ore milled (metric tons per day) | 15,300 | 15,200 | 14,900 | 14,800 |
| Average ore grades (percent): |  |  |  |  |
| Copper | 4.02 | 4.08 | 4.18 | 4.07 |
| Cobalt | 0.44 | 0.34 | 0.40 | 0.33 |
| Copper recovery rate (percent) | 93.9 | 92.7 | 93.9 | 93.7 |

a. Includes point-of-sale transportation costs as negotiated in customer contracts.

TFM's copper sales of 104 million pounds in second-quarter 2015 were lower than second-quarter 2014 copper sales of 118 million pounds primarily because of timing of shipments. TFM's copper sales for the first six months of 2015 of 237 million were higher than copper sales of 202 million for the first six months of 2014, primarily reflecting higher ore grades and timing of shipments.

For the year 2015, we expect sales volumes from TFM to approximate 460 million pounds of copper and 36 million pounds of cobalt, compared with 425 million pounds of copper and 30 million pounds of cobalt for the year 2014.

Unit Net Cash Costs. Unit net cash costs per pound of copper is a measure intended to provide investors with information about the cash-generating capacity of our mining operations expressed on a basis relating to the primary metal product for our respective operations. We use this measure for the same purpose and for monitoring operating performance by our mining operations. This information differs from measures of performance determined in accordance with U.S. GAAP and should not be considered in isolation or as a substitute for measures of performance determined in accordance with U.S. GAAP. This measure is presented by other metals mining companies, although our measure may not be comparable to similarly titled measures reported by other companies.

#### Gross Profit per Pound of Copper and Cobalt

The following table summarizes the unit net cash costs and gross profit per pound of copper and cobalt at our Africa mining operations for the second quarters and first six months of 2015 and 2014. Refer to “Production Revenues and Production Costs” for an explanation of “by-product” and “co-product” methods and a reconciliation of unit net cash costs per pound to production and delivery costs applicable to sales reported in our consolidated financial statements.

|  | Three Months Ended June 30, 2015 By-Product Method Copper | Co-Product Method Cobalt |  | Three Months Ended June 30, 2014 By-Product Method Copper Cobalt | Co-Product Method |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Revenues, excluding adjustmentsa | $2.63 | $2.63 | $9.27 | $3.08 | $3.08 | $9.58 |
| Site production and delivery, before net noncash and other costs shown below | 1.54 | 1.35 | 5.48 | 1.46 | 1.35 | 5.22 |
| Cobalt creditsb | (0.53) | — | — | (0.34) | — | — |
| Royalty on metals | 0.06 | 0.05 | 0.16 | 0.06 | 0.06 | 0.15 |
| Unit net cash costs | 1.07 | 1.40 | 5.64 | 1.18 | 1.41 | 5.37 |
| Depreciation, depletion and amortization | 0.55 | 0.43 | 1.42 | 0.54 | 0.46 | 1.30 |
| Noncash and other costs, net | 0.03 | 0.03 | 0.10 | 0.03 | 0.03 | 0.08 |
| Total unit costs | 1.65 | 1.86 | 7.16 | 1.75 | 1.90 | 6.75 |
| Revenue adjustments, primarily for pricing on prior period open sales | 0.02 | 0.02 | 0.50 | — | — | (0.19) |
| Gross profit per pound | $1.00 | $0.79 | $2.61 | $1.33 | $1.18 | $2.64 |
| Copper sales (millions of recoverable pounds) | 104 | 104 |  | 118 | 118 |  |
| Cobalt sales (millions of contained pounds) |  |  | 8 |  |  | 7 |

|  | Six Months Ended June 30, 2015 By-Product Method Copper | Co-Product Method Cobalt | Copper | Six Months Ended June 30, 2014 By-Product Method Cobalt | Co-Product Method |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Revenues, excluding adjustmentsa | $2.66 | $2.66 | $9.23 | $3.08 | $3.08 | $9.29 |
| Site production and delivery, before net noncash and other costs shown below | 1.56 | 1.37 | 5.54 | 1.47 | 1.30 | 5.19 |
| Cobalt creditsb | (0.44) | — | — | (0.48) | — | — |
| Royalty on metals | 0.06 | 0.05 | 0.15 | 0.07 | 0.06 | 0.16 |
| Unit net cash costs | 1.18 | 1.42 | 5.69 | 1.06 | 1.36 | 5.35 |
| Depreciation, depletion and amortization | 0.55 | 0.46 | 1.31 | 0.57 | 0.49 | 1.03 |
| Noncash and other costs, net | 0.03 | 0.03 | 0.08 | 0.05 | 0.04 | 0.09 |
| Total unit costs | 1.76 | 1.91 | 7.08 | 1.68 | 1.89 | 6.47 |
| Revenue adjustments, primarily for pricing on prior period open sales | (0.03) | (0.03) | (0.04) | (0.01) | (0.01) | 0.13 |
| Gross profit per pound | $0.87 | $0.72 | $2.11 | $1.39 | $1.18 | $2.95 |
| Copper sales (millions of recoverable pounds) | 237 | 237 |  | 202 | 202 |  |
| Cobalt sales (millions of contained pounds) |  |  | 16 |  |  | 15 |

a. Includes point-of-sale transportation costs as negotiated in customer contracts.

Unit net cash costs (net of cobalt credits) for our Africa operations of $1.07 per pound of copper in second-quarter 2015 were lower than unit net cash costs of $1.18 per pound in second-quarter 2014, primarily reflecting higher cobalt credits, partly offset by lower copper sales volumes. Africa's unit net cash costs of $1.18 per pound of copper for the first six months of 2015 were higher than unit net cash costs of $1.06 per pound for the first six months of 2014, primarily reflecting higher site production and delivery costs, partly offset by higher copper sales volumes.

Because certain assets are depreciated on a straight-line basis, Africa's unit depreciation rate may vary with the level of copper production and sales.

Assuming achievement of current sales volume and cost estimates, and an average cobalt market price of $13 per pound for the second half of 2015, average unit net cash costs (net of cobalt credits) are expected to approximate $1.12 per pound of copper for the year 2015, compared with $1.15 per pound in 2014. Africa's projected unit net cash costs would change by $0.05 per pound for each $2 per pound change in the average price of cobalt during the second half of 2015.

### Molybdenum Mines

We have two wholly owned molybdenum mines in North America – the Henderson underground mine and the Climax open-pit mine, both in Colorado. The Henderson and Climax mines produce high-purity, chemical-grade molybdenum concentrates, which are typically further processed into value-added molybdenum chemical products. The majority of the molybdenum concentrates produced at the Henderson and Climax mines, as well as from our North and South America copper mines, are processed at our own conversion facilities.

Production from the Molybdenum mines totaled 13 million pounds of molybdenum in second-quarter 2015, 26 million pounds of molybdenum for the first six months of 2015, 14 million pounds of molybdenum in second-quarter 2014 and 27 million pounds of molybdenum for the first six months of 2014. Refer to "Consolidated Results" for our consolidated molybdenum operating data, which includes sales of molybdenum produced at our Molybdenum mines, and from our North and South America copper mines, and refer to "Outlook" for projected consolidated molybdenum sales volumes.

Unit Net Cash Costs Per Pound of Molybdenum. Unit net cash costs per pound of molybdenum is a measure intended to provide investors with information about the cash-generating capacity of our mining operations expressed on a basis relating to the primary metal product for our respective operations. We use this measure for the same purpose and for monitoring operating performance by our mining operations. This information differs from measures of performance determined in accordance with U.S. GAAP and should not be considered in isolation or as a substitute for measures of performance determined in accordance with U.S. GAAP. This measure is presented by other metals mining companies, although our measure may not be comparable to similarly titled measures reported by other companies.

Average unit net cash costs for our Molybdenum mines of $7.19 per pound of molybdenum in second-quarter 2015 and $7.18 per pound of molybdenum for the first six months of 2015 were higher than average unit net cash costs of $6.47 per pound in second-quarter 2014 and $6.58 per pound of molybdenum for the first six months of 2014, primarily reflecting lower production volumes from the Henderson mine. Assuming achievement of current sales volume and cost estimates, we estimate unit net cash costs for the Molybdenum mines to average $7.50 per pound of molybdenum for the year 2015, compared with $7.08 per pound in 2014. Refer to “Product Revenues and Production Costs” for a reconciliation of unit net cash costs per pound to production and delivery costs applicable to sales reported in our consolidated financial statements.

As further discussed in “Overview,” we are currently reviewing operating plans at each of our copper and molybdenum mining operations and will revise operating and capital plans to strengthen our financial position in a weak copper price environment. The revised plans will target lower operating and capital costs to achieve maximum cash flow under the current market conditions. Production at certain operations challenged by low commodity prices will be curtailed. We expect to complete this review promptly and will report our revised plans during third-quarter 2015. Accordingly, our molybdenum sales volume and unit costs estimates are subject to change as a result of this review and other factors.

### Smelting & Refining

We wholly own and operate a smelter in Arizona (Miami smelter) and a smelter and refinery in Spain (Atlantic Copper). Additionally, PT-FI owns 25 percent of a smelter and refinery in Gresik, Indonesia (PT Smelting). Treatment charges for smelting and refining copper concentrates consist of a base rate and, in certain contracts, price participation based on copper prices. Treatment charges represent a cost to our mining operations and income to Atlantic Copper and PT Smelting. Thus, higher treatment charges benefit our smelter operations and adversely affect our mining operations. Our North America copper mines are less significantly affected by changes in treatment charges because these operations are largely integrated with our Miami smelter. Through this form of downstream integration, we are assured placement of a significant portion of our concentrate production.

Atlantic Copper smelts and refines copper concentrates and markets refined copper and precious metals in slimes. During the first six months of 2015, Atlantic Copper purchased 25 percent of its concentrate requirements from our North America mining operations and 5 percent of its concentrate requirements from our South America mining operations, with the remainder purchased from third parties.

PT-FI's contract with PT Smelting provides for PT-FI to supply 100 percent of the copper concentrate requirements (subject to a minimum or maximum rate) necessary for PT Smelting to produce 205,000 metric tons of copper annually on a priority basis. PT-FI also sells copper concentrate to PT Smelting at market rates for quantities in excess of 205,000 metric tons of copper annually. During the first six months of 2015, PT-FI sold approximately half of its copper concentrate production to PT Smelting. In July 2015, PT Smelting's operations were temporarily suspended pending completion of required repairs, which are expected to be completed in September 2015.

We defer recognizing profits on sales from our mining operations to Atlantic Copper and on 25 percent of Indonesia mining's sales to PT Smelting until final sales to third parties occur. Changes in these deferrals attributable to variability in intercompany volumes resulted in net additions to net income attributable to common stockholders of $13 million in second-quarter 2015 and $37 million for the first six months of 2015, compared with $41 million in second-quarter 2014 and $56 million for the first six months of 2014. Our net deferred profits on inventories at Atlantic Copper and PT Smelting to be recognized in future periods’ net income attributable to common stockholders totaled $28 million at June 30, 2015. Quarterly variations in ore grades, the timing of intercompany shipments and changes in product prices will result in variability in our net deferred profits and quarterly earnings.

### Oil and Gas

Through our wholly owned oil and gas subsidiary FCX Oil & Gas Inc. (FM O&G), our portfolio of oil and gas assets includes significant oil production facilities and growth potential in the Deepwater GOM, established oil production facilities onshore and offshore California, large onshore natural gas resources in the Haynesville shale play in Louisiana, natural gas production from the Madden area in Central Wyoming, and a position in the Inboard Lower Tertiary/Cretaceous natural gas trend onshore in South Louisiana. For the first six months of 2015, 88 percent of our oil and gas revenues, excluding the impact of derivative contracts, were from oil and NGLs.

On June 23, 2015, our wholly owned subsidiary, Freeport-McMoRan Oil & Gas Inc., filed a registration statement on Form S-1 with the U.S. SEC related to its potential IPO of Class A common stock, representing a minority interest in the entity. Freeport-McMoRan Oil & Gas Inc. intends to apply to list the common stock on the New York Stock Exchange under the ticker “FMOG.” The registration statement has not yet become effective, and securities may not be sold nor may offers to buy be accepted prior to the time the registration statement becomes effective.

On August 5, 2015, we announced the deferral of investments in several long-term projects in our oil and gas business, which will result in a reduction of $0.9 billion in projected capital expenditures for each of the years 2016 and 2017. We have also revised our estimate of the start-up of initial production from its recent drilling success in the Horn Mountain area to 2016 from the previously estimated start-up in 2017. This revised operating plan will allow FM O&G to continue to grow production and enhance cash flow in a weak oil and gas price environment. The revised plans, together with the potential IPO of a minority interest in Freeport-McMoRan Oil & Gas Inc., and potential other actions, will be pursued as required to fund oil and gas capital spending with cash flow for 2016 and subsequent years.

Impairment of Oil and Gas Properties. We follow the full cost method of accounting for our oil and gas operations, whereby all costs associated with oil and gas property acquisition, exploration and development activities are capitalized and amortized to expense under the UOP method on a country-by-country basis using estimates of proved oil and natural gas reserves relating to each country where such activities are conducted. The costs of unproved oil and gas properties are excluded from amortization until the properties are evaluated. Our DD&A rate is affected by changes to estimates of proved reserves and costs subject to amortization, as further discussed in "Critical Accounting Estimates" in Part II, Items 7. and 7A. of our annual report on Form 10-K for the year ended December 31, 2014.

Under full cost accounting rules, a "ceiling test" is conducted each quarter to review the carrying value of our oil and gas properties for impairment. The SEC requires the twelve-month average of the first-day-of-the-month historical reference oil price be used in determining the ceiling test limitation. Using West Texas Intermediate (WTI) as the reference oil price, the average price was $71.68 per barrel at June 30, 2015, compared with $82.72 per barrel at March 31, 2015. As of June 30, 2015, and March 31, 2015, net capitalized costs with respect to FM O&G's proved U.S. oil and gas properties exceeded the ceiling test limitation specified by the SEC's full cost accounting rules, which resulted in the recognition of impairment charges totaling $2.7 billion ($1.7 billion to net loss attributable to common stock) in second-quarter 2015 and $5.8 billion ($3.6 billion to net loss attributable to common stock) for the first six months of 2015.

If the twelve-month historical average price remains below the June 30, 2015, twelve-month average of $71.68 per barrel, the ceiling test limitation will decrease resulting in potentially significant additional ceiling test impairments of our oil and gas properties. The WTI spot oil price was $47.12 per barrel at July 31, 2015.

If the trailing twelve-month average prices for the period ended June 30, 2015, had been $59.35 per barrel of oil and $3.07 per MMBtu for natural gas, while all other inputs and assumptions remained constant, an additional pre-tax impairment charge of $1.8 billion would have been recorded to our oil and gas properties in second-quarter 2015. These oil and natural gas prices were determined using a twelve-month simple average of the first day of the month for the eleven months ended August 2015, and the August 2015, prices were held constant for the remaining one month. The additional pre-tax impairment is partly the result of a 26 percent decrease in proved undeveloped reserves because certain locations would not be economic at these prices. This calculation solely reflects the impact of hypothetical lower oil and natural gas prices on our ceiling test limitation and proved reserves as of June 30, 2015, and does not reflect the reduction in oil and gas capital expenditures that was announced on August 5, 2015. The oil and natural gas price is a single variable in the estimation of our proved reserves and other factors could have a significant impact on future reserves and the present value of future cash flows.

As further discussed in "Critical Accounting Estimates" in Part II, Items 7. and 7A. of our annual report on Form 10-K for the year ended December 31, 2014, in addition to declines in the trailing twelve-month average oil and natural gas prices, other factors that could result in future impairment of our oil and gas properties, include costs transferred from unevaluated properties to the full cost pool without corresponding proved oil and natural gas reserve additions, negative reserve revisions and increased future development or production costs. As FM O&G completes activities to assess its $9.3 billion in unevaluated properties, related costs currently recorded as unevaluated properties not subject to amortization will be transferred to the full cost pool. If these activities do not result in additions to discounted future net cash flows from proved oil and natural gas reserves at least equal to the related costs transferred (net of related tax effects), additional ceiling test impairments may occur.

U.S. Oil and Gas Operations. Following is summary operating results for the U.S. oil and gas operations for the second quarters and first six months of 2015 and 2014:

| Sales Volumes | Three Months Ended June 30, 2015 | 2014a | Six Months Ended June 30, 2015 | 2014a |
| --- | ---: | ---: | ---: | ---: |
| Oil (MMBbls) | 8.6 | 11.7 | 17.0 | 23.5 |
| Natural gas (Bcf) | 23.5 | 20.3 | 45.3 | 39.8 |
| NGLs (MMBbls) | 0.6 | 1.0 | 1.1 | 2.1 |
| MMBOE | 13.1 | 16.0 | 25.6 | 32.2 |
| **Average Realized Pricesb** |  |  |  |  |
| Oil (per barrel) | $67.61 | $95.50 | $62.13 | $94.63 |
| Natural gas (per MMBtu) | $2.66 | $4.44 | $2.75 | $4.55 |
| NGLs (per barrel) | $20.50 | $38.79 | $21.71 | $42.35 |
| **Gross (Loss) Profit per BOE** |  |  |  |  |
| Realized revenuesb | $50.04 | $77.53 | $46.95 | $77.37 |
| Less: cash production costsb | 19.04 | 19.57 | 19.62 | 19.03 |
| Cash operating marginb | 31.00 | 57.96 | 27.33 | 58.34 |
| Less: depreciation, depletion and amortization | 36.99 | 38.39 | 39.59 | 38.30 |
| Less: impairment of oil and gas properties | 204.91 | — | 225.89 | — |
| Less: accretion and other costs | 2.46 | 0.94 | 2.39 | 0.87 |
| Plus: net noncash mark-to-market (losses) gains on derivative contracts | (7.26) | (0.44) | (5.60) | 0.23 |
| Plus: other net adjustments | 0.61 | 0.04 | 0.34 | 0.04 |
| Gross (loss) profit | $(220.01) | $18.23 | $(245.80) | $19.44 |

a. The 2014 periods include results from the Eagle Ford field through June 19, 2014. Eagle Ford had sales volumes totaling 4.0 MMBOE for second-quarter 2014 and 8.7 MMBOE for the first six months of 2014; excluding Eagle Ford, oil and gas cash production costs were $21.66 per BOE for second-quarter 2014 and $21.29 per BOE for the first six months of 2014.

b. Cash operating margin for our oil and gas operations reflects realized revenues less cash production costs. Realized revenues exclude noncash mark-to-market adjustments on derivative contracts. For reconciliations of realized revenues (including average realized prices for oil, natural gas and NGLs) and cash production costs to revenues and production and delivery costs reported in our consolidated financial statements, refer to the supplemental schedule, "Product Revenues and Production Costs."

FM O&G's average realized price for crude oil was $67.61 per barrel, including $11.79 per barrel of cash gains on derivative contracts, in second-quarter 2015 and $62.13 per barrel, including $11.88 per barrel of cash gains on derivative contracts, for the first six months of 2015. Excluding the impact of derivative contracts, the second-quarter 2015 average realized price for crude oil was $55.82 per barrel (88 percent of the average Brent crude oil price of $63.57 per barrel) and $50.25 per barrel (85 percent of the average Brent crude oil price of $59.41 per barrel) for the first six months of 2015.

FM O&G has derivative contracts that provide price protection averaging between approximately $70 and $90 per barrel of Brent crude oil for more than 80 percent of estimated 2015 oil production. Assuming an average price of $56 per barrel for Brent crude oil, we would receive a benefit of $20 per barrel on remaining 2015 derivative contract volumes of 15.5 MMBbls, before taking into account weighted-average premiums of $6.89 per barrel. See Note 7 for further discussion.

FM O&G's average realized price for natural gas was $2.66 per MMBtu in second-quarter 2015, compared to the NYMEX natural gas price average of $2.65 per MMBtu for the April through June 2015 contracts; and $2.75 per MMBtu for the first six months of 2015, compared to the NYMEX natural gas price average of $2.81 per MMBtu for the January through June 2015 contracts.

Realized revenues for oil and gas operations of $50.04 per BOE in second-quarter 2015 and $46.95 per BOE for the first six months of 2015 were lower than realized revenues of $77.53 per BOE in second-quarter 2014 and $77.37 per BOE for the first six months of 2014, primarily reflecting lower oil prices, partly offset by the impact of higher realized cash gains on derivative contracts (cash gains were $101 million or $7.73 per BOE in second- quarter 2015 and $201 million or $7.87 per BOE for the first six months of 2015, compared with losses of $63 million or $3.94 per BOE in second-quarter 2014 and $128 million or $3.97 per BOE for the first six months of 2014).

Cash production costs for oil and gas operations of $19.04 per BOE in second-quarter 2015 were lower than cash production costs of $19.57 per BOE in second-quarter 2014, primarily reflecting lower cash production costs in California related to reductions in repair and maintenance costs and well workover expense, partly offset by the impact of the sale of lower-cost Eagle Ford properties in June 2014. Cash production costs for oil and gas properties of $19.62 per BOE for the first six months of 2015 were higher than cash production costs of $19.03 per BOE for the first six months of 2014, primarily reflecting the sale of lower-cost Eagle Ford properties in June 2014, partly offset by lower cash production costs in California related to reductions in repair and maintenance costs and well workover expense.

Following is a summary of average sales volumes per day by region for oil and gas operations for the second quarters and first six months of 2015 and 2014:

| Sales Volumes (MBOE per day): | Three Months Ended June 30, 2015 | 2014 | Six Months Ended June 30, 2015 | 2014a |
| --- | ---: | ---: | ---: | ---: |
| GOMa | 80 | 75 | 77 | 73 |
| California | 38 | 39 | 39 | 39 |
| Haynesville/Madden/Other | 26 | 18 | 26 | 18 |
| Eagle Fordb | — | 44 | — | 48 |
| Total oil and gas operations | 144 | 176 | 142 | 178 |

a. Includes sales from properties on the GOM Shelf and in the Deepwater GOM.

b. FM O&G completed the sale of Eagle Ford in June 2014.

Daily sales volumes averaged 144 MBOE in second-quarter 2015, including 95 MBbls of crude oil, 259 million cubic feet (MMcf) of natural gas and 5 MBbls of NGLs, and 142 MBOE for the first six months of 2015, including 94 MBbls of crude oil, 250 MMcf of natural gas and 6 MBbls of NGLs. Oil and gas sales volumes are expected to average 145 MBOE per day for the year 2015, comprised of 68 percent oil, 27 percent natural gas and 5 percent NGLs.

Based on current sales volume and cost estimates, cash production costs are expected to approximate $20 per BOE for the year 2015.

Exploration, Operating and Development Activities. Our oil and gas business has significant proved, probable and possible reserves, a broad range of development opportunities and high-potential exploration prospects. The business is managed to reinvest its cash flows in projects with attractive rates of return and risk profiles. Following the sharp decline in oil prices in late 2014, we have taken steps to significantly reduce capital spending plans and are evaluating funding opportunities for capital expenditures for our oil and gas business, including the potential IPO for a minority interest in Freeport-McMoRan Oil & Gas Inc.

FM O&G is focused on growing its strategic position in the Deepwater GOM with significant current oil production, strong cash margins and existing infrastructure and facilities with excess production and handling capacity. These assets, combined with FM O&G’s large leasehold interests in an established geologic basin, provide financially attractive investment opportunities for high-impact growth in oil production and cash margins. FM O&G’s capital allocation strategy is principally focused on development opportunities that can be tied back to existing facilities.

During second-quarter 2015, FM O&G achieved several important accomplishments, principally in its Deepwater GOM focus areas, that are expected to contribute to future growth. Production reached full capacity at the Lucius facility and development advanced at the Heidelberg field. Positive drilling results were achieved at the Holstein Deep and Quebec/Victory (QV), Kilo/Oscar (KO) and Horn Mountain Updip tieback prospects. Since commencing development activities in 2014 at its three 100-percent-owned production platforms in the Deepwater GOM, FM O&G has drilled 10 wells with positive results. Three of these wells have been brought on production, and FM O&G plans to complete and place in production six wells over the next 12 months and the remaining well in 2017. Longer term, FM O&G's production is expected to benefit from the success in the Atwater Valley focus area, where multiple discoveries have been drilled to date. During second-quarter 2015, FM O&G commenced drilling at the Deep Sleep exploration well in the Atwater Valley focus area.

U.S. Oil and Gas Capital Expenditures. Capital expenditures for our U.S. oil and gas operations totaled $0.8 billion (including $0.6 billion incurred for the Deepwater GOM and $0.1 billion for the Inboard Lower Tertiary/Cretaceous natural gas trend) for second-quarter 2015 and $1.8 billion (including $1.2 billion incurred for Deepwater GOM and $0.2 billion for the Inboard Lower Tertiary/Cretaceous natural gas trend) for the first six months of 2015.

Capital expenditures for oil and gas operations are estimated to total $2.8 billion for the year 2015, with approximately 85 percent of the 2015 capital budget expected to be directed to the highest potential return focus areas in the GOM.

*Deepwater GOM.* The drilling and evaluation of multiple development and exploration opportunities in the Deepwater GOM is in progress. These prospects benefit from tieback opportunities to significant available production capacity at the FM O&G operated large-scale Holstein, Marlin and Horn Mountain deepwater production platforms. In addition, FM O&G has interests in the Lucius and Heidelberg oil fields, and in the Atwater Valley focus area.

After successfully commencing first production in January 2015, the Lucius oil facility in Keathley Canyon reached capacity of 80 MBbls of oil per day in second-quarter 2015. FM O&G has a 25.1 percent working interest in Lucius, which consists of six subsea wells located in 7,200 feet of water tied back to a truss spar hull.

Field development continued at Heidelberg in the Green Canyon focus area during second-quarter 2015. Fabrication of the main topsides module is complete, the hull is on location, and mooring lines are completed. The Heidelberg truss spar was designed as a Lucius-look-alike facility with capacity of 80 MBbls of oil per day. Development drilling in the field is ongoing and first production is anticipated in 2016. Completion activities on the three initial wells are in progress. FM O&G has a 12.5 percent working interest in Heidelberg, which is a large, high-quality oil development project located in 5,300 feet of water.

In July 2015, FM O&G logged its third successful subsalt Miocene delineation well at the 100-percent-owned Holstein Deep development project in the Green Canyon focus area since commencing drilling in the area in third-quarter 2014. The third delineation well, which is the most updip in the reservoir, was drilled to 29,440 feet and wireline logs indicated that the well encountered approximately 200 feet of net oil pay. Drilling results from this initial three-well development program successfully established sand continuity across the primary reservoir.

Completion activities for the initial three-well subsea tieback development program are expected to commence in third-quarter 2015 and production is expected to begin in 2016. Successful results from the initial three-well drilling program established opportunities for additional wells. When fully developed, this project will have the potential to produce up to 75 MBOE per day. The Holstein Deep development is located in Green Canyon Block 643, west of the Holstein platform in 3,890 feet of water with production facilities capable of processing 113 MBbls of oil per day.

FM O&G’s 100-percent-owned Marlin Hub is located in the Mississippi Canyon focus area and has production facilities capable of processing 60 MBbls of oil per day. Several tieback opportunities have been identified, including the 100-percent-owned Dorado and King development projects. Future wells can be brought on-line using existing infrastructure with the potential to utilize subsea enhancement technologies that could increase total recovery efficiencies. In second-quarter 2015, FM O&G completed maintenance activities, including the installation of new export flow line flex joints, which will extend the life of the Marlin platform.

The initial FM O&G drilled Dorado well was placed in production in March 2015 after a successful production test with gross volumes in excess of 8 MBOE per day and continues to produce at strong rates. Drilling operations for the second and third wells, which are targeting similar undrained fault blocks and updip resource potential south of the Marlin facility, are expected to begin in 2016. The Dorado development is located on Viosca Knoll Block 915 in 3,860 feet of water.

Initial production from the first exploration well at King is expected to commence in fourth-quarter 2015, and additional drilling is planned in the area starting in the second-half of 2015. King is located in Mississippi Canyon south of the Marlin facility in 5,200 feet of water.

FM O&G’s 100-percent-owned Horn Mountain field is also located in the Mississippi Canyon focus area and has production facilities capable of processing 75 MBbls of oil per day. To enhance recovery of remaining oil in place, future development plans will target subsea tieback from multiple stacked sands in the area. In second-quarter 2015, the QV well, the first location of this program, was drilled to 14,780 feet and successfully logged 355 net feet of oil and gas pay. In June 2015, drilling operations commenced at the KO and Horn Mountain Updip wells. At KO, the well was drilled to a total depth of 14,250 feet in July 2015 and successfully logged 166 net feet of oil pay. FM O&G plans to complete the KO and QV wells and place them in production in 2016. At Horn Mountain Updip, the well was drilled to a total depth of 14,780 feet in July 2015 and successfully logged 112 net feet of oil and gas pay. These infill wells are targeting undrained fault blocks and updip resource potential east and west of the Horn Mountain facility, which is located in approximately 5,400 feet of water.

FM O&G has an 18.67 percent working interest in the Vito oil discovery and a significant lease position in the Atwater Valley focus area. Vito is a large, deep subsalt Miocene oil discovery made in 2009, located in approximately 4,000 feet of water. Exploration and delineation drilling in recent years confirmed a significant resource in high-quality, subsalt Miocene sands. Development options are under evaluation and FM O&G expects the operator to propose a sanctioning development plan in 2016.

As previously reported, success at the Power Nap exploration well and appraisal sidetracks, which are located in close proximity to Vito, produced positive results and development options are being assessed. The neighboring Deep Sleep exploration well in the greater Mars/Ursa basin commenced drilling in June 2015. Deep Sleep is located in 4,200 feet of water approximately five miles south of Power Nap. FM O&G owns a 50 percent working interest in the Power Nap and Deep Sleep prospects.

*Inboard Lower Tertiary/Cretaceous*. FM O&G has a position in the Inboard Lower Tertiary/Cretaceous natural gas trend, located onshore in South Louisiana.

In second-quarter 2015, the Highlander well, which has been restricted because of limited processing facilities, averaged a gross rate of 22 MMcf per day (approximately 11 MMcf per day net to FM O&G). As previously reported production testing in February 2015 indicated a flow rate of 75 MMcf per day (approximately 37 MMcf per day net to FM O&G). FM O&G is developing additional processing facilities to accommodate the higher flow rates with installation expected by year-end 2015. In July 2015, the Highlander well was shut in for remedial workover operations to address a mechanical issue encountered in the wellbore. A second well location has been identified, and future plans are being considered. FM O&G is the operator and has a 72 percent working interest and an approximate 49 percent net revenue interest in Highlander. FM O&G has identified multiple additional locations on the Highlander structure, which is located onshore in South Louisiana where FM O&G controls rights to more than 50,000 gross acres.

The Farthest Gate West onshore exploration prospect was drilled to a total depth of approximately 22,000 feet in March 2015. In May 2015, we completed our assessment of the Farthest Gate West well and commenced plug and abandonment activities. No proved reserves were identified.

*California.* Sales volumes from California averaged 38 MBOE per day for second-quarter 2015, compared with 39 MBOE per day for second-quarter 2014. FM O&G’s position in California is located onshore in the San Joaquin Valley and Los Angeles Basin, and offshore in the Point Arguello and Point Pedernales fields. During second-quarter 2015, production from Point Arguello platforms, which produced approximately 2 MBOE per day in first-quarter 2015, was temporarily shut in following the shutdown of a third-party operated pipeline system that transports oil to various California refineries.

*Haynesville*. FM O&G has rights to a substantial natural gas resource, located in the Haynesville shale play in North Louisiana. Drilling activities remain constrained in response to low natural gas prices in order to maximize near-term cash flows and to preserve the resource for potentially higher future natural gas prices.

*International Exploration (Morocco)*. FM O&G has a farm-in arrangement to earn interests in exploration blocks located in the Mazagan permit area offshore Morocco. The exploration area covers 2.2 million gross acres in water depths of 4,500 to 9,900 feet. In May 2015, FM O&G commenced drilling the MZ-1 well associated with the Ouanoukrim prospect. In early August 2015, drilling of the well was completed to its targeted depth below 20,000 feet to evaluate the primary objectives, which did not contain hydrocarbons. As of June 30, 2015, capitalized costs for international oil and gas exploration activities in Morocco approximated $111 million and additional costs have been incurred subsequent to June 30, 2015, all of which will be transferred to the Moroccan full cost pool in third-quarter 2015. FM O&G currently has no proved reserves or production in Morocco.

### CAPITAL RESOURCES AND LIQUIDITY

Our operating cash flows vary with prices realized from copper, gold, molybdenum and oil sales, our sales volumes, production costs, income taxes, other working capital changes and other factors. Since December 31, 2014, our debt has increased primarily reflecting the impact of lower commodity prices and capital expenditures for our oil and gas exploration and development projects and mining expansion projects. Capital expenditures are expected to decline in future years as major mining projects near completion. We remain committed to a strong balance sheet and have sold assets, deferred capital spending and reduced dividends on our common stock.

In July 2015, we announced that we are undertaking a comprehensive review of operating plans in our mining and oil and gas businesses to target significant additional reductions in capital spending and operating and administrative costs in response to weak market conditions for our major products. On August 5, 2015, we provided an update on our progress and announced the deferral of investments in several long-term projects in our oil and gas business, which will result in a reduction of $0.9 billion in projected capital expenditures for each of the years 2016 and 2017. The revised plans, together with the potential IPO of a minority interest in our wholly owned subsidiary, Freeport-McMoRan Oil & Gas Inc., and potential other actions, will be pursued as required to fund oil and gas capital spending with cash flow for 2016 and subsequent years. Refer to “Operations - Oil and Gas” for further discussion of the potential IPO.

We are completing the review of operating plans at each of our copper and molybdenum mining operations and will revise operating and capital plans to strengthen our financial position in a weak copper price environment. The revised plans will target lower operating and capital costs to achieve maximum cash flow under the current market conditions. Production at certain operations challenged by low commodity prices will be curtailed. We expect to complete this review promptly and will report our revised plans during third-quarter 2015. We will also continue to assess opportunities to partner with strategic investors potentially interested in investing capital with FCX in the development of our oil and gas and mining properties. We have a broad set of assets with valuable infrastructure and associated resources with attractive long-term production and development potential.

### Cash

Following is a summary of the U.S. and international components of consolidated cash and cash equivalents, including cash available to the parent company, net of noncontrolling interests' share, taxes and other costs (in millions):

|  | June 30, 2015 | December 31, 2014 |
| --- | ---: | ---: |
| Cash at domestic companies | $29 | $78 |
| Cash at international operations | 437 | 386 |
| Total consolidated cash and cash equivalents | 466 | 464 |
| Less: noncontrolling interests’ share | (119) | (91) |
| Cash, net of noncontrolling interests’ share | 347 | 373 |
| Less: withholding taxes and other | (19) | (16) |
| Net cash available | $328 | $357 |

Cash held at our international operations is generally used to support our foreign operations' capital expenditures, operating expenses, working capital and other tax payments, or other cash needs. With the exception of TFM, we have not elected to permanently reinvest earnings from our foreign subsidiaries, and we have recorded deferred tax liabilities for foreign earnings that are available to be repatriated to the U.S. From time to time, our foreign subsidiaries distribute earnings to the U.S. through dividends that are subject to applicable withholding taxes and noncontrolling interests' share.

### Debt

Following is a summary of our total debt and the related weighted-average interest rates (in billions, except percentages):

|  | June 30, 2015 |  | Weighted- Average Interest Rate | December 31, 2014 | Weighted- Average Interest Rate |
| --- | ---: | --- | ---: | ---: | ---: |
| FCX Senior Notes | $11.9 |  | 3.8% | $12.0 | 3.8% |
| FCX Term Loan | 3.0 |  | 1.9% | 3.1 | 1.7% |
| FM O&G Senior Notes | 2.6 |  | 6.6% | 2.6 | 6.6% |
| Cerro Verde Term Loan | 1.3 | a | 2.1% | 0.4 | 2.1% |
| Other FCX debt | 2.1 | b | 2.7% | 0.9 | 3.9% |
| Total debt | $20.9 |  | 3.6% | $19.0 | 3.8% |

a. At June 30, 2015, Cerro Verde had $1.3 billion of borrowings outstanding and no letters of credit issued under its $1.8 billion senior unsecured credit facility to fund a portion of its expansion project (see "Operations - South America Mining") and for Cerro Verde's general corporate purposes.

b. At June 30, 2015, we had $985 million of borrowings outstanding and $42 million in letters of credit issued under our $4 billion revolving credit facility. We also have uncommitted and short-term lines of credit with certain financial institutions that are unsecured, which have terms and pricing that are generally more favorable than our revolving credit facility. At June 30, 2015, there was $410 million of borrowings drawn on these lines of credit.

As further discussed in Note 18 in our annual report on Form 10-K for the year ended December 31, 2014, in February 2015, our revolving credit facility and term loan were modified to amend the maximum total leverage ratio.

Our revolving credit facility and term loan contain financial ratio covenants governing maximum total leverage and minimum interest coverage, which limits our ability to incur additional debt. We are taking steps to enhance our financial position in response to recent declines in commodity prices. Further actions are being considered, such as additional equity capital or other transactions, including opportunities to partner with strategic investors potentially interested in investing capital in the development of our oil and gas and mining properties. We may also be required to seek an amendment to the covenants in our revolving credit facility and term loan.

For further discussion of our debt, refer to Note 6 in this report, and Note 8 in our annual report on Form 10-K for the year ended December 31, 2014.

### Operating Activities

During the first six months of 2015, we generated consolidated operating cash flows totaling $1.8 billion (net of $190 million for working capital uses and changes in other tax payments), compared with consolidated operating cash flows for the first six months of 2014 of $2.6 billion (net of $777 million for working capital uses and changes in other tax payments). Lower consolidated operating cash flows for the first six months of 2015, compared with the first six months of 2014, primarily reflected the impact of lower commodity price realizations and lower oil volumes, partly offset by a decrease in working capital uses mostly associated with oil and gas derivative contracts and lower commodity prices.

Based on current operating plans and current commodity prices for copper, gold, molybdenum and crude oil, we expect estimated consolidated operating cash flows for the year 2015, plus available cash and availability under our credit facility and uncommitted lines of credit, to be sufficient to fund our budgeted capital expenditures, dividends, noncontrolling interest distributions and other cash requirements for the year. Refer to “Outlook” for further discussion of projected operating cash flows for the year 2015.

### Investing Activities

Capital Expenditures. Capital expenditures, including capitalized interest, totaled $3.5 billion for the first six months of 2015, including $1.2 billion for major projects at mining operations and $1.8 billion for oil and gas operations, compared with $3.6 billion for the first six months of 2014, including $1.4 billion for major projects at mining operations and $1.5 billion for oil and gas operations. Lower capital expenditures for the first six months of 2015 were primarily associated with decreased spending for the Morenci mill expansion, partly offset by increased capital expenditures at our oil and gas operations and increased capital expenditures for the Cerro Verde expansion. Refer to “Operations” for further discussion.

Capital expenditures are currently expected to approximate $6.3 billion for the year 2015, including $2.5 billion for major projects at mining operations (primarily for the Cerro Verde expansion and underground development activities at Grasberg) and $2.8 billion for oil and gas operations, primarily at our highest potential return focus areas in the GOM. Projected 2015 capital expenditures for mining operations are subject to change as a result of the review of operating plans discussed above. We made substantial progress toward the completion of our major mining development projects, which are expected to result in increased near-term production, lower unit costs, declining capital expenditures and to contribute to cash flow from operations after capital expenditures in future years. In addition, positive oil and gas drilling and development activities are expected to result in a growing oil production profile.

Acquisitions and Dispositions. In June 2014, we acquired additional interests in the Deepwater GOM, for $0.9 billion, and also completed the sale of our Eagle Ford shale assets for $3.1 billion (before closing adjustments). The Deepwater GOM acquisition was funded with a portion of the net proceeds from the sale of Eagle Ford. The estimated combined after-tax net proceeds from these transactions approximated $1.8 billion, before purchase price adjustments. Refer to Note 2 for further discussion of our acquisition and disposal transactions.

### Financing Activities

Debt Transactions. Net proceeds from debt for the first six months of 2015 primarily included net borrowings of $1.0 billion under our revolving credit facility and borrowings of $0.8 billion under Cerro Verde's senior unsecured credit facility to fund its expansion project.

On April 30, 2014, we redeemed $210 million of the aggregate principal amount of the outstanding 6.625% Senior Notes. Holders received the principal amount together with the redemption premium and accrued and unpaid interest to the redemption date. Refer to Note 6 for further discussion of debt transactions.

Dividends. We paid dividends on our common stock totaling $380 million for the first six months of 2015 and $653 million for the first six months of 2014. In response to the impact of lower commodity prices, in March 2015, the annual dividend rate for our common stock was reduced to $0.20 per share from the previous rate of $1.25 per share. On June 24, 2015, our Board of Directors (the Board) declared a regular quarterly dividend of $0.05 per share and a one-time special dividend of $0.1105 per share in accordance with the approved settlement terms of shareholder derivative litigation (refer to Note 9). Both the regular quarterly dividend and the special dividend were paid on August 3, 2015. The declaration of dividends is at the discretion of the Board and will depend upon our financial results, cash requirements, future prospects and other factors deemed relevant by the Board. Refer to Note 6 for further discussion.

Cash dividends and other distributions paid to noncontrolling interests totaled $60 million for the first six months of 2015 and $250 million for the first six months of 2014. These payments will vary based on the cash requirements of the related consolidated subsidiaries.

### CONTRACTUAL OBLIGATIONS

As of June 30, 2015, we have current maturities of debt totaling $791 million, including $658 million for the second half of 2015 and $133 million for the first half of 2016, primarily reflecting bank lines of credit, which are extended to us on a uncommitted basis. As of June 30, 2015, debt maturities total $260 million for the year 2016 and $1.5 billion for the year 2017. With the exception of debt maturities and the related impact on scheduled interest payment obligations, there have been no material changes in our contractual obligations since December 31, 2014. Refer to Part II, Items 7. and 7A. in our annual report on Form 10-K for the year ended December 31, 2014, for further information regarding our contractual obligations.

### CONTINGENCIES

### Environmental and Asset Retirement Obligations

Our current and historical operating activities are subject to stringent laws and regulations governing the protection of the environment. We perform a comprehensive annual review of our environmental and asset retirement obligations and also review changes in facts and circumstances associated with these obligations at least quarterly. There have been no material changes to our environmental and asset retirement obligations since December 31, 2014. Updated cost assumptions, including increases and decreases to cost estimates, changes in the anticipated scope and timing of remediation activities, and settlement of environmental matters may result in additional revisions to certain of our environmental obligations.

Refer to Note 12 in our annual report on Form 10-K for the year ended December 31, 2014, for further information regarding our environmental and asset retirement obligations.

### Litigation and Other Contingencies

Other than as discussed in Note 9, and contained in "Legal Proceedings" in Part II, Item 1. of this quarterly report, there have been no material changes to our contingencies associated with legal proceedings and other matters since December 31, 2014. Refer to Note 12 and "Legal Proceedings" contained in Part I, Item 3. of our annual report on Form 10-K for the year ended December 31, 2014.

### NEW ACCOUNTING STANDARDS

We do not expect the impact of recently issued accounting standards to have a significant impact on our future financial statements and disclosures. Refer to Note 12 for discussion of a recently adopted Accounting Standards Update.

### PRODUCT REVENUES AND PRODUCTION COSTS

### Mining Product Revenues and Unit Net Cash Cost

Unit net cash costs per pound of copper and molybdenum are measures intended to provide investors with information about the cash-generating capacity of our mining operations expressed on a basis relating to the primary metal product for the respective operations. We use this measure for the same purpose and for monitoring operating performance by our mining operations. This information differs from measures of performance determined in accordance with U.S. generally accepted accounting principles (GAAP) and should not be considered in isolation or as a substitute for measures of performance determined in accordance with U.S. GAAP. This measure is presented by other metals mining companies, although our measures may not be comparable to similarly titled measures reported by other companies.

We present gross profit per pound of copper in the following tables using both a “by-product” method and a “co-product” method. We use the by-product method in our presentation of gross profit per pound of copper because (i) the majority of our revenues are copper revenues, (ii) we mine ore, which contains copper, gold, molybdenum and other metals, (iii) it is not possible to specifically assign all of our costs to revenues from the copper, gold, molybdenum and other metals we produce, (iv) it is the method used to compare mining operations in certain industry publications and (v) it is the method used by our management and the Board to monitor operations. In the co-product method presentations below, shared costs are allocated to the different products based on their relative revenue values, which will vary to the extent our metals sales volumes and realized prices change.

We show revenue adjustments for prior period open sales as a separate line item. Because these adjustments do not result from current period sales, we have reflected these separately from revenues on current period sales. Noncash and other costs consist of items such as stock-based compensation costs, start-up costs, LCM inventory adjustments, write-offs of equipment and/or unusual charges. They are removed from site production and delivery costs in the calculation of unit net cash costs. As discussed above, gold, molybdenum and other metal revenues at copper mines are reflected as credits against site production and delivery costs in the by-product method. The following schedules for our mining operations are presentations under both the by-product and co-product methods together with reconciliations to amounts reported in our consolidated financial statements.

### Oil and Gas Product Revenues and Cash Production Costs per Unit

Realized revenues and cash production costs per unit are measures intended to provide investors with information about the cash operating margin of our oil and gas operations. We use this measure for the same purpose and for monitoring operating performance by our oil and gas operations. This information differs from measures of performance determined in accordance with U.S. GAAP and should not be considered in isolation or as a substitute for measures of performance determined in accordance with U.S. GAAP. Our measures may not be comparable to similarly titled measures reported by other companies.

We show revenue adjustments from derivative contracts as separate line items. Because these adjustments do not result from oil and gas sales, these gains and losses have been reflected separately from revenues on current period sales. Additionally, accretion charges for asset retirement obligations and other costs are removed from production and delivery costs in the calculation of cash production costs per BOE. The following schedules include calculations of oil and gas product revenues and cash production costs together with a reconciliation to amounts reported in our consolidated financial statements.

### North America Copper Mines Product Revenues, Production Costs and Unit Net Cash Costs

*(In millions)*

| Three Months Ended June 30, 2015 | By-Product Method |  | Co-Product Method Copper |  | Molybdenuma |  | Otherb | Total |
| --- | ---: | --- | ---: | --- | ---: | --- | ---: | ---: |
| Revenues, excluding adjustments | $1,341 |  | $1,341 |  | $80 |  | $28 | $1,449 |
| Site production and delivery, before net noncash and other costs shown below | 862 |  | 804 |  | 64 |  | 22 | 890 |
| By-product credits | (80) |  | — |  | — |  | — | — |
| Treatment charges | 60 |  | 58 |  | — |  | 2 | 60 |
| Net cash costs | 842 |  | 862 |  | 64 |  | 24 | 950 |
| Depreciation, depletion and amortization | 137 |  | 129 |  | 5 |  | 3 | 137 |
| Noncash and other costs, net | 46 | c | 45 |  | 1 |  | — | 46 |
| Total costs | 1,025 |  | 1,036 |  | 70 |  | 27 | 1,133 |
| Revenue adjustments, primarily for pricing on prior period open sales | (13) |  | (13) |  | — |  | — | (13) |
| Gross profit | $303 |  | $292 |  | $10 |  | $1 | $303 |
| Copper sales (millions of recoverable pounds) | 485 |  | 485 |  |  |  |  |  |
| Molybdenum sales (millions of recoverable pounds)a |  |  |  |  | 10 |  |  |  |
| Gross profit per pound of copper/molybdenum: |  |  |  |  |  |  |  |  |
| Revenues, excluding adjustments | $2.77 |  | $2.77 |  | $7.80 |  |  |  |
| Site production and delivery, before net noncash and other costs shown below | 1.78 |  | 1.66 |  | 6.24 |  |  |  |
| By-product credits | (0.16) |  | — |  | — |  |  |  |
| Treatment charges | 0.12 |  | 0.12 |  | — |  |  |  |
| Unit net cash costs | 1.74 |  | 1.78 |  | 6.24 |  |  |  |
| Depreciation, depletion and amortization | 0.28 |  | 0.27 |  | 0.53 |  |  |  |
| Noncash and other costs, net | 0.10 | c | 0.09 |  | 0.06 |  |  |  |
| Total unit costs | 2.12 |  | 2.14 |  | 6.83 |  |  |  |
| Revenue adjustments, primarily for pricing |  |  |  |  |  |  |  |  |
| on prior period open sales | (0.03) |  | (0.03) |  | — |  |  |  |
| Gross profit per pound | $0.62 |  | $0.60 |  | $0.97 |  |  |  |
| Reconciliation to Amounts Reported |  |  |  |  |  |  |  |  |
| (In millions) | Revenues |  | Production and Delivery |  | Depreciation, Depletion and Amortization |  |  |  |
| Totals presented above | $1,449 |  | $890 |  | $137 |  |  |  |
| Treatment charges | — |  | 60 | c | — |  |  |  |
| Noncash and other costs, net | — |  | 46 |  | — |  |  |  |
| Revenue adjustments, primarily for pricing on prior period open sales | (13) |  | — |  | — |  |  |  |
| Eliminations and other | (31) |  | (34) |  | 2 |  |  |  |
| North America copper mines | 1,405 |  | 962 |  | 139 |  |  |  |
| Other mining & eliminationsd | 2,274 |  | 1,603 |  | 263 |  |  |  |
| Total mining | 3,679 |  | 2,565 |  | 402 |  |  |  |
| U.S. oil & gas operations | 569 |  | 281 |  | 3,171 | e |  |  |
| Corporate, other & eliminations | — |  | 2 |  | 3 |  |  |  |
| As reported in FCX’s consolidated financial statements | $4,248 |  | $2,848 |  | $3,576 | e |  |  |

a. Reflects sales of molybdenum produced by certain of the North America copper mines to our molybdenum sales company at market-based pricing.

b. Includes gold and silver product revenues and production costs.

c. Includes charges totaling $11 million ($0.02 per pound) for LCM inventory adjustments.

d. Represents the combined total for all other mining operations and the related eliminations, as presented in Note 10.

e. Includes impairment of oil and gas properties of $2.7 billion.

### North America Copper Mines Product Revenues, Production Costs and Unit Net Cash Costs (continued)

*(In millions)*

| Three Months Ended June 30, 2014 By-Product Method | Co-Product Method Copper | Molybdenuma | Otherb | Total |
| --- | ---: | ---: | ---: | ---: |
| Revenues, excluding adjustments $1,332 | $1,332 | $112 | $30 | $1,474 |
| Site production and delivery, before net noncash and other costs shown below 786 | 733 | 60 | 19 | 812 |
| By-product credits (116) | — | — | — | — |
| Treatment charges 46 | 45 | — | 1 | 46 |
| Net cash costs 716 | 778 | 60 | 20 | 858 |
| Depreciation, depletion and amortization 125 | 117 | 6 | 2 | 125 |
| Noncash and other costs, net 29 | 29 | — | — | 29 |
| Total costs 870 | 924 | 66 | 22 | 1,012 |
| Revenue adjustments, primarily for pricing on prior period open sales 9 | 9 | — | — | 9 |
| Gross profit $471 | $417 | $46 | $8 | $471 |
| Copper sales (millions of recoverable pounds) 421 | 421 |  |  |  |
| Molybdenum sales (millions of recoverable pounds)a |  | 9 |  |  |
| Gross profit per pound of copper/molybdenum: |  |  |  |  |
| Revenues, excluding adjustments $3.16 | $3.16 | $12.49 |  |  |
| Site production and delivery, before net noncash and other costs shown below 1.87 | 1.74 | 6.73 |  |  |
| By-product credits (0.28) | — | — |  |  |
| Treatment charges 0.11 | 0.11 | — |  |  |
| Unit net cash costs 1.70 | 1.85 | 6.73 |  |  |
| Depreciation, depletion and amortization 0.30 | 0.28 | 0.64 |  |  |
| Noncash and other costs, net 0.07 | 0.06 | 0.05 |  |  |
| Total unit costs 2.07 | 2.19 | 7.42 |  |  |
| Revenue adjustments, primarily for pricing |  |  |  |  |
| on prior period open sales 0.02 | 0.02 | — |  |  |
| Gross profit per pound $1.11 | $0.99 | $5.07 |  |  |
| Reconciliation to Amounts Reported |  |  |  |  |
| (In millions) Revenues | Production and Delivery | Depreciation, Depletion and Amortization |  |  |
| Totals presented above $1,474 | $812 | $125 |  |  |
| Treatment charges — | 46 | — |  |  |
| Noncash and other costs, net — | 29 | — |  |  |
| Revenue adjustments, primarily for pricing on prior period open sales 9 | — | — |  |  |
| Eliminations and other (14) | (17) | 3 |  |  |
| North America copper mines 1,469 | 870 | 128 |  |  |
| Other mining & eliminationsc 2,817 | 1,884 | 266 |  |  |
| Total mining 4,286 | 2,754 | 394 |  |  |
| U.S. oil & gas operations 1,236 | 329 | 616 |  |  |
| Corporate, other & eliminations — | (1) | 3 |  |  |
| As reported in FCX’s consolidated financial statements $5,522 | $3,082 | $1,013 |  |  |

a. Reflects sales of molybdenum produced by certain of the North America copper mines to our molybdenum sales company at market-based pricing.

b. Includes gold and silver product revenues and production costs.

c. Represents the combined total for all other mining operations and the related eliminations, as presented in Note 10.

### North America Copper Mines Product Revenues, Production Costs and Unit Net Cash Costs (continued)

*(In millions)*

| Six Months Ended June 30, 2015 | By-Product Method |  | Co-Product Method Copper |  | Molybdenuma |  | Otherb | Total |
| --- | ---: | --- | ---: | --- | ---: | --- | ---: | ---: |
| Revenues, excluding adjustments | $2,612 |  | $2,612 |  | $162 |  | $54 | $2,828 |
| Site production and delivery, before net noncash and other costs shown below | 1,715 |  | 1,605 |  | 122 |  | 41 | 1,768 |
| By-product credits | (163) |  | — |  | — |  | — | — |
| Treatment charges | 121 |  | 118 |  | — |  | 3 | 121 |
| Net cash costs | 1,673 |  | 1,723 |  | 122 |  | 44 | 1,889 |
| Depreciation, depletion and amortization | 270 |  | 254 |  | 11 |  | 5 | 270 |
| Noncash and other costs, net | 77 | c | 76 |  | 1 |  | — | 77 |
| Total costs | 2,020 |  | 2,053 |  | 134 |  | 49 | 2,236 |
| Revenue adjustments, primarily for pricing on prior period open sales | (28) |  | (28) |  | — |  | — | (28) |
| Gross profit | $564 |  | $531 |  | $28 |  | $5 | $564 |
| Copper sales (millions of recoverable pounds) | 956 |  | 956 |  |  |  |  |  |
| Molybdenum sales (millions of recoverable pounds)a |  |  |  |  | 19 |  |  |  |
| Gross profit per pound of copper/molybdenum: |  |  |  |  |  |  |  |  |
| Revenues, excluding adjustments | $2.73 |  | $2.73 |  | $8.28 |  |  |  |
| Site production and delivery, before net noncash |  |  |  |  |  |  |  |  |
| and other costs shown below | 1.79 |  | 1.68 |  | 6.24 |  |  |  |
| By-product credits | (0.17) |  | — |  | — |  |  |  |
| Treatment charges | 0.13 |  | 0.12 |  | — |  |  |  |
| Unit net cash costs | 1.75 |  | 1.80 |  | 6.24 |  |  |  |
| Depreciation, depletion and amortization | 0.28 |  | 0.27 |  | 0.58 |  |  |  |
| Noncash and other costs, net | 0.08 | c | 0.08 |  | 0.06 |  |  |  |
| Total unit costs | 2.11 |  | 2.15 |  | 6.88 |  |  |  |
| Revenue adjustments, primarily for pricing |  |  |  |  |  |  |  |  |
| on prior period open sales | (0.03) |  | (0.03) |  | — |  |  |  |
| Gross profit per pound | $0.59 |  | $0.55 |  | $1.40 |  |  |  |
| Reconciliation to Amounts Reported |  |  |  |  |  |  |  |  |
| (In millions) | Revenues |  | Production and Delivery |  | Depreciation, Depletion and Amortization |  |  |  |
| Totals presented above | $2,828 |  | $1,768 |  | $270 |  |  |  |
| Treatment charges | — |  | 121 |  | — |  |  |  |
| Noncash and other costs, net | — |  | 77 | c | — |  |  |  |
| Revenue adjustments, primarily for pricing on prior period open sales | (28) |  | — |  | — |  |  |  |
| Eliminations and other | (60) |  | (61) |  | 2 |  |  |  |
| North America copper mines | 2,740 |  | 1,905 |  | 272 |  |  |  |
| Other mining & eliminationsd | 4,592 |  | 3,286 |  | 535 |  |  |  |
| Total mining | 7,332 |  | 5,191 |  | 807 |  |  |  |
| U.S. oil & gas operations | 1,069 |  | 564 |  | 6,805 | e |  |  |
| Corporate, other & eliminations | — |  | 5 |  | 7 |  |  |  |
| As reported in FCX’s consolidated financial statements | $8,401 |  | $5,760 |  | $7,619 | e |  |  |

a. Reflects sales of molybdenum produced by certain of the North America copper mines to our molybdenum sales company at market-based pricing.

b. Includes gold and silver product revenues and production costs.

c. Includes charges totaling $11 million ($0.01 per pound) for LCM inventory adjustments.

d. Represents the combined total for all other mining operations and the related eliminations, as presented in Note 10.

e. Includes impairment of oil and gas properties of $5.8 billion.

### North America Copper Mines Product Revenues, Production Costs and Unit Net Cash Costs (continued)

*(In millions)*

| Six Months Ended June 30, 2014 | By-Product Method | Co-Product Method Copper | Molybdenuma | Otherb | Total |
| --- | ---: | ---: | ---: | ---: | ---: |
| Revenues, excluding adjustments | $2,535 | $2,535 | $194 | $59 | $2,788 |
| Site production and delivery, before net noncash and other costs shown below | 1,481 | 1,388 | 110 | 38 | 1,536 |
| By-product credits | (198) | — | — | — | — |
| Treatment charges | 93 | 91 | — | 2 | 93 |
| Net cash costs | 1,376 | 1,479 | 110 | 40 | 1,629 |
| Depreciation, depletion and amortization | 229 | 217 | 10 | 2 | 229 |
| Noncash and other costs, net | 59 | 58 | — | 1 | 59 |
| Total costs | 1,664 | 1,754 | 120 | 43 | 1,917 |
| Revenue adjustments, primarily for pricing on prior period open sales | (7) | (7) | — | — | (7) |
| Gross profit | $864 | $774 | $74 | $16 | $864 |
| Copper sales (millions of recoverable pounds) | 790 | 790 |  |  |  |
| Molybdenum sales (millions of recoverable pounds)a |  |  | 17 |  |  |
| Gross profit per pound of copper/molybdenum: |  |  |  |  |  |
| Revenues, excluding adjustments | $3.21 | $3.21 | $11.39 |  |  |
| Site production and delivery, before net noncash |  |  |  |  |  |
| and other costs shown below | 1.87 | 1.76 | 6.45 |  |  |
| By-product credits | (0.25) | — | — |  |  |
| Treatment charges | 0.12 | 0.12 | — |  |  |
| Unit net cash costs | 1.74 | 1.88 | 6.45 |  |  |
| Depreciation, depletion and amortization | 0.29 | 0.27 | 0.58 |  |  |
| Noncash and other costs, net | 0.08 | 0.07 | 0.04 |  |  |
| Total unit costs | 2.11 | 2.22 | 7.07 |  |  |
| Revenue adjustments, primarily for pricing |  |  |  |  |  |
| on prior period open sales | (0.01) | (0.01) | — |  |  |
| Gross profit per pound | $1.09 | $0.98 | $4.32 |  |  |
| Reconciliation to Amounts Reported |  |  |  |  |  |
| (In millions) | Revenues | Production and Delivery | Depreciation, Depletion and Amortization |  |  |
| Totals presented above | $2,788 | $1,536 | $229 |  |  |
| Treatment charges | — | 93 | — |  |  |
| Noncash and other costs, net | — | 59 | — |  |  |
| Revenue adjustments, primarily for pricing on prior period open sales | (7) | — | — |  |  |
| Eliminations and other | (26) | (32) | 6 |  |  |
| North America copper mines | 2,755 | 1,656 | 235 |  |  |
| Other mining & eliminationsc | 5,255 | 3,524 | 505 |  |  |
| Total mining | 8,010 | 5,180 | 740 |  |  |
| U.S. oil & gas operations | 2,497 | 640 | 1,232 |  |  |
| Corporate, other & eliminations | — | (1) | 7 |  |  |
| As reported in FCX’s consolidated financial statements | $10,507 | $5,819 | $1,979 |  |  |

a. Reflects sales of molybdenum produced by certain of the North America copper mines to our molybdenum sales company at market-based pricing.

b. Includes gold and silver product revenues and production costs.

c. Represents the combined total for all other mining operations and the related eliminations, as presented in Note 10.

### South America Mining Product Revenues, Production Costs and Unit Net Cash Costs

*(In millions)*

| Three Months Ended June 30, 2015 | By-Product Method | Co-Product Method Copper | Othera |  | Total |
| --- | ---: | ---: | ---: | --- | ---: |
| Revenues, excluding adjustments | $479 | $479 | $14 |  | $493 |
| Site production and delivery, before net noncash and other costs shown below | 314 | 305 | 15 |  | 320 |
| By-product credits | (8) | — | — |  | — |
| Treatment charges | 30 | 30 | — |  | 30 |
| Royalty on metals | 1 | 1 | — |  | 1 |
| Net cash costs | 337 | 336 | 15 |  | 351 |
| Depreciation, depletion and amortization | 72 | 70 | 2 |  | 72 |
| Noncash and other (credits) costs, net | (4) | (5) | 1 |  | (4) |
| Total costs | 405 | 401 | 18 |  | 419 |
| Revenue adjustments, primarily for pricing on prior period open sales | (8) | (8) | — |  | (8) |
| Gross profit (loss) | $66 | $70 | $(4) |  | $66 |
| Copper sales (millions of recoverable pounds) | 178 | 178 |  |  |  |
| Gross profit per pound of copper: |  |  |  |  |  |
| Revenues, excluding adjustments | $2.69 | $2.69 |  |  |  |
| Site production and delivery, before net noncash and other costs shown below | 1.77 | 1.72 |  |  |  |
| By-product credits | (0.04) | — |  |  |  |
| Treatment charges | 0.17 | 0.17 |  |  |  |
| Royalty on metals | — | — |  |  |  |
| Unit net cash costs | 1.90 | 1.89 |  |  |  |
| Depreciation, depletion and amortization | 0.40 | 0.39 |  |  |  |
| Noncash and other (credits) costs, net | (0.02) | (0.03) |  |  |  |
| Total unit costs | 2.28 | 2.25 |  |  |  |
| Revenue adjustments, primarily for pricing |  |  |  |  |  |
| on prior period open sales | (0.05) | (0.05) |  |  |  |
| Gross profit per pound | $0.36 | $0.39 |  |  |  |
| Reconciliation to Amounts Reported |  |  |  |  |  |
| (In millions) | Revenues | Production and Delivery | Depreciation, Depletion and Amortization |  |  |
| Totals presented above | $493 | $320 | $72 |  |  |
| Treatment charges | (30) | — | — |  |  |
| Royalty on metals | (1) | — | — |  |  |
| Noncash and other (credits) costs, net | — | (4) | — |  |  |
| Revenue adjustments, primarily for pricing on prior period open sales | (8) | — | — |  |  |
| Eliminations and other | (1) | (1) | — |  |  |
| South America mining | 453 | 315 | 72 |  |  |
| Other mining & eliminationsb | 3,226 | 2,250 | 330 |  |  |
| Total mining | 3,679 | 2,565 | 402 |  |  |
| U.S. oil & gas operations | 569 | 281 | 3,171 | c |  |
| Corporate, other & eliminations | — | 2 | 3 |  |  |
| As reported in FCX’s consolidated financial statements | $4,248 | $2,848 | $3,576 | c |  |

a. Includes silver sales of 373 thousand ounces ($15.15 per ounce average realized price). Also reflects sales of molybdenum produced by Cerro Verde to our molybdenum sales company at market-based pricing.

b. Represents the combined total for all other mining operations and the related eliminations, as presented in Note 10.

c. Includes impairment of oil and gas properties of $2.7 billion.

### South America Mining Product Revenues, Production Costs and Unit Net Cash Costs (continued)

*(In millions)*

| Three Months Ended June 30, 2014 | By-Product Method |  | Co-Product Method Copper | Othera | Total |
| --- | ---: | --- | ---: | ---: | ---: |
| Revenues, excluding adjustments | $984 |  | $984 | $75 | $1,059 |
| Site production and delivery, before net noncash and other costs shown below | 511 |  | 474 | 41 | 515 |
| By-product credits | (71) |  | — | — | — |
| Treatment charges | 55 |  | 55 | — | 55 |
| Royalty on metals | 3 |  | 3 | — | 3 |
| Net cash costs | 498 | b | 532 | 41 | 573 |
| Depreciation, depletion and amortization | 95 |  | 90 | 5 | 95 |
| Noncash and other costs, net | 23 |  | 19 | 4 | 23 |
| Total costs | 616 |  | 641 | 50 | 691 |
| Revenue adjustments, primarily for pricing on prior period open sales | 32 |  | 32 | — | 32 |
| Gross profit | $400 |  | $375 | $25 | $400 |
| Copper sales (millions of recoverable pounds) | 310 | b | 310 |  |  |
| Gross profit per pound of copper: |  |  |  |  |  |
| Revenues, excluding adjustments | $3.17 |  | $3.17 |  |  |
| Site production and delivery, before net noncash and other costs shown below | 1.64 |  | 1.52 |  |  |
| By-product credits | (0.23) |  | — |  |  |
| Treatment charges | 0.18 |  | 0.18 |  |  |
| Royalty on metals | 0.01 |  | 0.01 |  |  |
| Unit net cash costs | 1.60 | b | 1.71 |  |  |
| Depreciation, depletion and amortization | 0.30 |  | 0.29 |  |  |
| Noncash and other costs, net | 0.08 |  | 0.06 |  |  |
| Total unit costs | 1.98 |  | 2.06 |  |  |
| Revenue adjustments, primarily for pricing |  |  |  |  |  |
| on prior period open sales | 0.10 |  | 0.10 |  |  |
| Gross profit per pound | $1.29 |  | $1.21 |  |  |
| Reconciliation to Amounts Reported |  |  |  |  |  |
| (In millions) | Revenues |  | Production and Delivery | Depreciation, Depletion and Amortization |  |
| Totals presented above | $1,059 |  | $515 | $95 |  |
| Treatment charges | (55) |  | — | — |  |
| Royalty on metals | (3) |  | — | — |  |
| Noncash and other costs, net | — |  | 23 | — |  |
| Revenue adjustments, primarily for pricing on prior period open sales | 32 |  | — | — |  |
| Eliminations and other | (2) |  | (8) | — |  |
| South America mining | 1,031 |  | 530 | 95 |  |
| Other mining & eliminationsc | 3,255 |  | 2,224 | 299 |  |
| Total mining | 4,286 |  | 2,754 | 394 |  |
| U.S. oil & gas operations | 1,236 |  | 329 | 616 |  |
| Corporate, other & eliminations | — |  | (1) | 3 |  |
| As reported in FCX’s consolidated financial statements | $5,522 |  | $3,082 | $1,013 |  |

a. Includes gold sales of 20 thousand ounces ($1,302 per ounce average realized price) and silver sales of 748 thousand ounces ($18.83 per ounce average realized price). Also reflects sales of molybdenum produced by Cerro Verde to our molybdenum sales company at market-based pricing.

b. Following is a reconciliation of South America mining's second-quarter 2014 unit net cash costs, excluding the Candelaria and Ojos del Salado mines:

|  | Net Cash Costs (in millions) | Copper Sales (millions of recoverable pounds) | Unit Net Cash Costs (per pound of copper) |
| --- | ---: | ---: | ---: |
| Presented above | $498 | 310 | $1.60 |
| Less: Candelaria and Ojos del Salado | 140 | 80 |  |
|  | $358 | 230 | $1.55 |

c. Represents the combined total for all other mining operations and the related eliminations, as presented in Note 10.

### South America Mining Product Revenues, Production Costs and Unit Net Cash Costs (continued)

*(In millions)*

| Six Months Ended June 30, 2015 | By-Product Method | Co-Product Method Copper | Othera |  | Total |
| --- | ---: | ---: | ---: | --- | ---: |
| Revenues, excluding adjustments | $1,013 | $1,013 | $35 |  | $1,048 |
| Site production and delivery, before net noncash and other costs shown below | 664 | 642 | 33 |  | 675 |
| By-product credits | (24) | — | — |  | — |
| Treatment charges | 64 | 64 | — |  | 64 |
| Royalty on metals | 1 | 1 | — |  | 1 |
| Net cash costs | 705 | 707 | 33 |  | 740 |
| Depreciation, depletion and amortization | 147 | 143 | 4 |  | 147 |
| Noncash and other costs, net | — | — | — |  | — |
| Total costs | 852 | 850 | 37 |  | 887 |
| Revenue adjustments, primarily for pricing on prior period open sales | (31) | (31) | — |  | (31) |
| Gross profit (loss) | $130 | $132 | $(2) |  | $130 |
| Copper sales (millions of recoverable pounds) | 378 | 378 |  |  |  |
| Gross profit per pound of copper: |  |  |  |  |  |
| Revenues, excluding adjustments | $2.68 | $2.68 |  |  |  |
| Site production and delivery, before net noncash |  |  |  |  |  |
| and other costs shown below | 1.76 | 1.70 |  |  |  |
| By-product credits | (0.06) | — |  |  |  |
| Treatment charges | 0.17 | 0.17 |  |  |  |
| Royalty on metals | — | — |  |  |  |
| Unit net cash costs | 1.87 | 1.87 |  |  |  |
| Depreciation, depletion and amortization | 0.39 | 0.38 |  |  |  |
| Noncash and other costs, net | — | — |  |  |  |
| Total unit costs | 2.26 | 2.25 |  |  |  |
| Revenue adjustments, primarily for pricing |  |  |  |  |  |
| on prior period open sales | (0.08) | (0.08) |  |  |  |
| Gross profit per pound | $0.34 | $0.35 |  |  |  |
| Reconciliation to Amounts Reported |  |  |  |  |  |
| (In millions) | Revenues | Production and Delivery | Depreciation, Depletion and Amortization |  |  |
| Totals presented above | $1,048 | $675 | $147 |  |  |
| Treatment charges | (64) | — | — |  |  |
| Royalty on metals | (1) | — | — |  |  |
| Noncash and other costs, net | — | — | — |  |  |
| Revenue adjustments, primarily for pricing on prior period open sales | (31) | — | — |  |  |
| Eliminations and other | (13) | (15) | — |  |  |
| South America mining | 939 | 660 | 147 |  |  |
| Other mining & eliminationsb | 6,393 | 4,531 | 660 |  |  |
| Total mining | 7,332 | 5,191 | 807 |  |  |
| U.S. oil & gas operations | 1,069 | 564 | 6,805 | c |  |
| Corporate, other & eliminations | — | 5 | 7 |  |  |
| As reported in FCX’s consolidated financial statements | $8,401 | $5,760 | $7,619 | c |  |

a. Includes silver sales of 759 thousand ounces ($14.97 per ounce average realized price). Also reflects sales of molybdenum produced by Cerro Verde to our molybdenum sales company at market-based pricing.

b. Represents the combined total for all other mining operations and the related eliminations, as presented in Note 10.

c. Includes impairment of oil and gas properties of $5.8 billion.

### South America Mining Product Revenues, Production Costs and Unit Net Cash Costs (continued)

*(In millions)*

| Six Months Ended June 30, 2014 | By-Product Method |  | Co-Product Method Copper | Othera | Total |
| --- | ---: | --- | ---: | ---: | ---: |
| Revenues, excluding adjustments | $1,951 |  | $1,951 | $159 | $2,110 |
| Site production and delivery, before net noncash and other costs shown below | 972 |  | 900 | 81 | 981 |
| By-product credits | (150) |  | — | — | — |
| Treatment charges | 108 |  | 108 | — | 108 |
| Royalty on metals | 3 |  | 3 | — | 3 |
| Net cash costs | 933 | b | 1,011 | 81 | 1,092 |
| Depreciation, depletion and amortization | 182 |  | 170 | 12 | 182 |
| Noncash and other costs, net | 40 |  | 38 | 2 | 40 |
| Total costs | 1,155 |  | 1,219 | 95 | 1,314 |
| Revenue adjustments, primarily for pricing on prior period open sales | (67) |  | (67) | — | (67) |
| Gross profit | $729 |  | $665 | $64 | $729 |
| Copper sales (millions of recoverable pounds) | 617 | b | 617 |  |  |
| Gross profit per pound of copper: |  |  |  |  |  |
| Revenues, excluding adjustments | $3.16 |  | $3.16 |  |  |
| Site production and delivery, before net noncash |  |  |  |  |  |
| and other costs shown below | 1.57 |  | 1.46 |  |  |
| By-product credits | (0.24) |  | — |  |  |
| Treatment charges | 0.18 |  | 0.18 |  |  |
| Royalty on metals | — |  | — |  |  |
| Unit net cash costs | 1.51 | b | 1.64 |  |  |
| Depreciation, depletion and amortization | 0.29 |  | 0.27 |  |  |
| Noncash and other costs, net | 0.07 |  | 0.06 |  |  |
| Total unit costs | 1.87 |  | 1.97 |  |  |
| Revenue adjustments, primarily for pricing |  |  |  |  |  |
| on prior period open sales | (0.11) |  | (0.11) |  |  |
| Gross profit per pound | $1.18 |  | $1.08 |  |  |
| Reconciliation to Amounts Reported |  |  |  |  |  |
| (In millions) | Revenues |  | Production and Delivery | Depreciation, Depletion and Amortization |  |
| Totals presented above | $2,110 |  | $981 | $182 |  |
| Treatment charges | (108) |  | — | — |  |
| Royalty on metals | (3) |  | — | — |  |
| Noncash and other costs, net | — |  | 40 | — |  |
| Revenue adjustments, primarily for pricing on prior period open sales | (67) |  | — | — |  |
| Eliminations and other | (3) |  | (15) | — |  |
| South America mining | 1,929 |  | 1,006 | 182 |  |
| Other mining & eliminationsc | 6,081 |  | 4,174 | 558 |  |
| Total mining | 8,010 |  | 5,180 | 740 |  |
| U.S. oil & gas operations | 2,497 |  | 640 | 1,232 |  |
| Corporate, other & eliminations | — |  | (1) | 7 |  |
| As reported in FCX’s consolidated financial statements | $10,507 |  | $5,819 | $1,979 |  |

a. Includes gold sales of 43 thousand ounces ($1,302 per ounce average realized price) and silver sales of 1.5 million ounces ($19.34 per ounce average realized price). Also reflects sales of molybdenum produced by Cerro Verde to our molybdenum sales company at market-based pricing.

b. Following is a reconciliation of South America mining's unit net cash costs for the first six months of 2014, excluding the Candelaria and Ojos del Salado mines:

|  | Net Cash Costs (in millions) | Copper Sales (millions of recoverable pounds) | Unit Net Cash Costs (per pound of copper) |
| --- | ---: | ---: | ---: |
| Presented above | $933 | 617 | $1.51 |
| Less: Candelaria and Ojos del Salado | 263 | 174 |  |
|  | $670 | 443 | $1.51 |

c. Represents the combined total for all other mining operations and the related eliminations, as presented in Note 10.

### Indonesia Mining Product Revenues, Production Costs and Unit Net Cash Costs

*(In millions)*

| Three Months Ended June 30, 2015 | By-Product Method | Co-Product Method Copper | Gold |  | Silvera | Total |
| --- | ---: | ---: | ---: | --- | ---: | ---: |
| Revenues, excluding adjustments | $511 | $511 | $406 |  | $8 | $925 |
| Site production and delivery, before net noncash and other costs shown below | 442 | 244 | 194 |  | 4 | 442 |
| Gold and silver credits | (416) | — | — |  | — | — |
| Treatment charges | 62 | 34 | 27 |  | 1 | 62 |
| Export duties | 36 | 20 | 16 |  | — | 36 |
| Royalty on metals | 35 | 19 | 16 |  | — | 35 |
| Net cash costs | 159 | 317 | 253 |  | 5 | 575 |
| Depreciation and amortization | 78 | 43 | 34 |  | 1 | 78 |
| Noncash and other costs, net | 8 | 5 | 3 |  | — | 8 |
| Total costs | 245 | 365 | 290 |  | 6 | 661 |
| Revenue adjustments, primarily for pricing on prior period open sales | (4) | (4) | 2 |  | — | (2) |
| PT Smelting intercompany loss | (5) | (3) | (2) |  | — | (5) |
| Gross profit | $257 | $139 | $116 |  | $2 | $257 |
| Copper sales (millions of recoverable pounds) | 196 | 196 |  |  |  |  |
| Gold sales (thousands of recoverable ounces) |  |  | 346 |  |  |  |
| Gross profit per pound of copper/per ounce of gold: |  |  |  |  |  |  |
| Revenues, excluding adjustments | $2.61 | $2.61 | $1,173 |  |  |  |
| Site production and delivery, before net noncash and other costs shown below | 2.26 | 1.25 | 560 |  |  |  |
| Gold and silver credits | (2.13) | — | — |  |  |  |
| Treatment charges | 0.32 | 0.18 | 79 |  |  |  |
| Export duties | 0.18 | 0.10 | 45 |  |  |  |
| Royalty on metals | 0.18 | 0.10 | 45 |  |  |  |
| Unit net cash costs | 0.81 | 1.63 | 729 |  |  |  |
| Depreciation and amortization | 0.40 | 0.22 | 100 |  |  |  |
| Noncash and other costs, net | 0.04 | 0.02 | 10 |  |  |  |
| Total unit costs | 1.25 | 1.87 | 839 |  |  |  |
| Revenue adjustments, primarily for pricing |  |  |  |  |  |  |
| on prior period open sales | (0.02) | (0.02) | 7 |  |  |  |
| PT Smelting intercompany loss | (0.02) | (0.01) | (5) |  |  |  |
| Gross profit per pound/ounce | $1.32 | $0.71 | $336 |  |  |  |
| Reconciliation to Amounts Reported |  |  |  |  |  |  |
| (In millions) | Revenues | Production and Delivery | Depreciation, Depletion and Amortization |  |  |  |
| Totals presented above | $925 | $442 | $78 |  |  |  |
| Treatment charges | (62) | — | — |  |  |  |
| Export duties | (36) | — | — |  |  |  |
| Royalty on metals | (35) | — | — |  |  |  |
| Noncash and other costs, net | — | 8 | — |  |  |  |
| Revenue adjustments, primarily for pricing on prior period open sales | (2) | — | — |  |  |  |
| PT Smelting intercompany loss | — | 5 | — |  |  |  |
| Indonesia mining | 790 | 455 | 78 |  |  |  |
| Other mining & eliminationsb | 2,889 | 2,110 | 324 |  |  |  |
| Total mining | 3,679 | 2,565 | 402 |  |  |  |
| U.S. oil & gas operations | 569 | 281 | 3,171 | c |  |  |
| Corporate, other & eliminations | — | 2 | 3 |  |  |  |
| As reported in FCX’s consolidated financial statements | $4,248 | $2,848 | $3,576 | c |  |  |

a. Includes silver sales of 558 thousand ounces ($15.48 per ounce average realized price).

b. Represents the combined total for all other mining operations and the related eliminations, as presented in Note 10.

c. Includes impairment of oil and gas properties of $2.7 billion.

### Indonesia Mining Product Revenues, Production Costs and Unit Net Cash Costs (continued)

*(In millions)*

| Three Months Ended June 30, 2014 | By-Product Method |  | Co-Product Method Copper |  | Gold | Silvera | Total |
| --- | ---: | --- | ---: | --- | ---: | ---: | ---: |
| Revenues, excluding adjustments | $372 |  | $372 |  | $176 | $7 | $555 |
| Site production and delivery, before net noncash and other costs shown below | 451 |  | 303 |  | 142 | 6 | 451 |
| Gold and silver credits | (184) |  | — |  | — | — | — |
| Treatment charges | 30 |  | 20 |  | 10 | — | 30 |
| Royalty on metals | 14 |  | 9 |  | 5 | — | 14 |
| Net cash costs | 311 |  | 332 |  | 157 | 6 | 495 |
| Depreciation and amortization | 54 |  | 36 |  | 17 | 1 | 54 |
| Noncash and other costs, net | 64 | b | 43 |  | 20 | 1 | 64 |
| Total costs | 429 |  | 411 |  | 194 | 8 | 613 |
| Revenue adjustments, primarily for pricing on prior period open sales | 11 |  | 11 |  | 1 | — | 12 |
| PT Smelting intercompany profit | 4 |  | 3 |  | 1 | — | 4 |
| Gross loss | $(42) |  | $(25) |  | $(16) | $(1) | $(42) |
| Copper sales (millions of recoverable pounds) | 117 |  | 117 |  |  |  |  |
| Gold sales (thousands of recoverable ounces) |  |  |  |  | 135 |  |  |
| Gross profit per pound of copper/per ounce of gold: |  |  |  |  |  |  |  |
| Revenues, excluding adjustments | $3.19 |  | $3.19 |  | $1,294 |  |  |
| Site production and delivery, before net noncash and other costs shown below | 3.86 |  | 2.59 |  | 1,050 |  |  |
| Gold and silver credits | (1.57) |  | — |  | — |  |  |
| Treatment charges | 0.26 |  | 0.17 |  | 70 |  |  |
| Royalty on metals | 0.11 |  | 0.08 |  | 31 |  |  |
| Unit net cash costs | 2.66 |  | 2.84 |  | 1,151 |  |  |
| Depreciation and amortization | 0.47 |  | 0.31 |  | 127 |  |  |
| Noncash and other costs, net | 0.55 | b | 0.37 |  | 151 |  |  |
| Total unit costs | 3.68 |  | 3.52 |  | 1,429 |  |  |
| Revenue adjustments, primarily for pricing |  |  |  |  |  |  |  |
| on prior period open sales | 0.09 |  | 0.09 |  | 5 |  |  |
| PT Smelting intercompany profit | 0.03 |  | 0.02 |  | 9 |  |  |
| Gross loss per pound/ounce | $(0.37) |  | $(0.22) |  | $(121) |  |  |
| Reconciliation to Amounts Reported |  |  |  |  |  |  |  |
| (In millions) | Revenues |  | Production and Delivery |  | Depreciation, Depletion and Amortization |  |  |
| Totals presented above | $555 |  | $451 |  | $54 |  |  |
| Treatment charges | (30) |  | — |  | — |  |  |
| Royalty on metals | (14) |  | — |  | — |  |  |
| Noncash and other costs, net | — |  | 64 | b | — |  |  |
| Revenue adjustments, primarily for pricing on prior period open sales | 12 |  | — |  | — |  |  |
| PT Smelting intercompany profit | — |  | (4) |  | — |  |  |
| Indonesia mining | 523 |  | 511 |  | 54 |  |  |
| Other mining & eliminationsc | 3,763 |  | 2,243 |  | 340 |  |  |
| Total mining | 4,286 |  | 2,754 |  | 394 |  |  |
| U.S. oil & gas operations | 1,236 |  | 329 |  | 616 |  |  |
| Corporate, other & eliminations | — |  | (1) |  | 3 |  |  |
| As reported in FCX’s consolidated financial statements | $5,522 |  | $3,082 |  | $1,013 |  |  |

a. Includes silver sales of 367 thousand ounces ($19.67 per ounce average realized price).

b. Includes $56 million ($0.48 per pound) of fixed costs charged directly to cost of sales as a result of the impact of export restrictions on PT-FI's operating rates.

c. Represents the combined total for all other mining operations and the related eliminations, as presented in Note 10.

### Indonesia Mining Product Revenues, Production Costs and Unit Net Cash Costs (continued)

*(In millions)*

| Six Months Ended June 30, 2015 | By-Product Method | Co-Product Method Copper | Gold |  | Silvera |  | Total |
| --- | ---: | ---: | ---: | --- | ---: | --- | ---: |
| Revenues, excluding adjustments | $933 | $933 | $716 |  | $16 | a | $1,665 |
| Site production and delivery, before net noncash and other costs shown below | 882 | 494 | 380 |  | 8 |  | 882 |
| Gold and silver credits | (741) | — | — |  | — |  | — |
| Treatment charges | 108 | 61 | 46 |  | 1 |  | 108 |
| Export duties | 57 | 32 | 24 |  | 1 |  | 57 |
| Royalty on metals | 60 | 33 | 26 |  | 1 |  | 60 |
| Net cash costs | 366 | 620 | 476 |  | 11 |  | 1,107 |
| Depreciation and amortization | 148 | 83 | 64 |  | 1 |  | 148 |
| Noncash and other costs, net | 14 | 8 | 6 |  | — |  | 14 |
| Total costs | 528 | 711 | 546 |  | 12 |  | 1,269 |
| Revenue adjustments, primarily for pricing on prior period open sales | (52) | (52) | 9 |  | — |  | (43) |
| PT Smelting intercompany profit | 2 | 2 | — |  | — |  | 2 |
| Gross profit | $355 | $172 | $179 |  | $4 |  | $355 |
| Copper sales (millions of recoverable pounds) | 351 | 351 |  |  |  |  |  |
| Gold sales (thousands of recoverable ounces) |  |  | 606 |  |  |  |  |
| Gross profit per pound of copper/per ounce of gold: |  |  |  |  |  |  |  |
| Revenues, excluding adjustments | $2.66 | $2.66 | $1,183 |  |  |  |  |
| Site production and delivery, before net noncash |  |  |  |  |  |  |  |
| and other costs shown below | 2.51 | 1.41 | 626 |  |  |  |  |
| Gold and silver credits | (2.11) | — | — |  |  |  |  |
| Treatment charges | 0.31 | 0.17 | 77 |  |  |  |  |
| Export duties | 0.16 | 0.09 | 41 |  |  |  |  |
| Royalty on metals | 0.17 | 0.10 | 42 |  |  |  |  |
| Unit net cash costs | 1.04 | 1.77 | 786 |  |  |  |  |
| Depreciation and amortization | 0.42 | 0.24 | 106 |  |  |  |  |
| Noncash and other costs, net | 0.04 | 0.02 | 10 |  |  |  |  |
| Total unit costs | 1.50 | 2.03 | 902 |  |  |  |  |
| Revenue adjustments, primarily for pricing |  |  |  |  |  |  |  |
| on prior period open sales | (0.15) | (0.15) | 14 |  |  |  |  |
| PT Smelting intercompany profit | 0.01 | 0.01 | 2 |  |  |  |  |
| Gross profit per pound/ounce | $1.02 | $0.49 | $297 |  |  |  |  |
| Reconciliation to Amounts Reported |  |  |  |  |  |  |  |
| (In millions) | Revenues | Production and Delivery | Depreciation, Depletion and Amortization |  |  |  |  |
| Totals presented above | $1,665 | $882 | $148 |  |  |  |  |
| Treatment charges | (108) | — | — |  |  |  |  |
| Export duties | (57) | — | — |  |  |  |  |
| Royalty on metals | (60) | — | — |  |  |  |  |
| Noncash and other costs, net | — | 14 | — |  |  |  |  |
| Revenue adjustments, primarily for pricing on prior period open sales | (43) | — | — |  |  |  |  |
| PT Smelting intercompany profit | — | (2) | — |  |  |  |  |
| Indonesia mining | 1,397 | 894 | 148 |  |  |  |  |
| Other mining & eliminationsb | 5,935 | 4,297 | 659 |  |  |  |  |
| Total mining | 7,332 | 5,191 | 807 |  |  |  |  |
| U.S. oil & gas operations | 1,069 | 564 | 6,805 | c |  |  |  |
| Corporate, other & eliminations | — | 5 | 7 |  |  |  |  |
| As reported in FCX’s consolidated financial statements | $8,401 | $5,760 | $7,619 | c |  |  |  |

a. Includes silver sales of 993 thousand ounces ($15.75 per ounce average realized price).

b. Represents the combined total for all other mining operations and the related eliminations, as presented in Note 10.

c. Includes impairment of oil and gas properties of $5.8 billion.

### Indonesia Mining Product Revenues, Production Costs and Unit Net Cash Costs (continued)

*(In millions)*

| Six Months Ended June 30, 2014 | By-Product Method |  | Co-Product Method Copper |  | Gold | Silvera | Total |
| --- | ---: | --- | ---: | --- | ---: | ---: | ---: |
| Revenues, excluding adjustments | $713 |  | $713 |  | $386 | $14 | $1,113 |
| Site production and delivery, before net noncash and other costs shown below | 814 |  | 521 |  | 283 | 10 | 814 |
| Gold and silver credits | (419) |  | — |  | — | — | — |
| Treatment charges | 56 |  | 36 |  | 19 | 1 | 56 |
| Royalty on metals | 27 |  | 17 |  | 9 | 1 | 27 |
| Net cash costs | 478 |  | 574 |  | 311 | 12 | 897 |
| Depreciation and amortization | 102 |  | 65 |  | 36 | 1 | 102 |
| Noncash and other costs, net | 138 | b | 88 |  | 48 | 2 | 138 |
| Total costs | 718 |  | 727 |  | 395 | 15 | 1,137 |
| Revenue adjustments, primarily for pricing on prior period open sales | (56) |  | (56) |  | 18 | 1 | (37) |
| PT Smelting intercompany profit | 58 |  | 37 |  | 20 | 1 | 58 |
| Gross (loss) profit | $(3) |  | $(33) |  | $29 | $1 | $(3) |
| Copper sales (millions of recoverable pounds) | 226 |  | 226 |  |  |  |  |
| Gold sales (thousands of recoverable ounces) |  |  |  |  | 297 |  |  |
| Gross profit per pound of copper/per ounce of gold: |  |  |  |  |  |  |  |
| Revenues, excluding adjustments | $3.15 |  | $3.15 |  | $1,299 |  |  |
| Site production and delivery, before net noncash |  |  |  |  |  |  |  |
| and other costs shown below | 3.60 |  | 2.31 |  | 950 |  |  |
| Gold and silver credits | (1.85) |  | — |  | — |  |  |
| Treatment charges | 0.25 |  | 0.16 |  | 65 |  |  |
| Royalty on metals | 0.12 |  | 0.07 |  | 31 |  |  |
| Unit net cash costs | 2.12 |  | 2.54 |  | 1,046 |  |  |
| Depreciation and amortization | 0.45 |  | 0.29 |  | 120 |  |  |
| Noncash and other costs, net | 0.61 | b | 0.39 |  | 161 |  |  |
| Total unit costs | 3.18 |  | 3.22 |  | 1,327 |  |  |
| Revenue adjustments, primarily for pricing |  |  |  |  |  |  |  |
| on prior period open sales | (0.24) |  | (0.24) |  | 59 |  |  |
| PT Smelting intercompany profit | 0.26 |  | 0.16 |  | 68 |  |  |
| Gross (loss) profit per pound/ounce | $(0.01) |  | $(0.15) |  | $99 |  |  |
| Reconciliation to Amounts Reported |  |  |  |  |  |  |  |
| (In millions) | Revenues |  | Production and Delivery |  | Depreciation, Depletion and Amortization |  |  |
| Totals presented above | $1,113 |  | $814 |  | $102 |  |  |
| Treatment charges | (56) |  | — |  | — |  |  |
| Royalty on metals | (27) |  | — |  | — |  |  |
| Noncash and other costs, net | — |  | 138 | b | — |  |  |
| Revenue adjustments, primarily for pricing on prior period open sales | (37) |  | — |  | — |  |  |
| PT Smelting intercompany profit | — |  | (58) |  | — |  |  |
| Indonesia mining | 993 |  | 894 |  | 102 |  |  |
| Other mining & eliminationsc | 7,017 |  | 4,286 |  | 638 |  |  |
| Total mining | 8,010 |  | 5,180 |  | 740 |  |  |
| U.S. oil & gas operations | 2,497 |  | 640 |  | 1,232 |  |  |
| Corporate, other & eliminations | — |  | (1) |  | 7 |  |  |
| As reported in FCX’s consolidated financial statements | $10,507 |  | $5,819 |  | $1,979 |  |  |

a. Includes silver sales of 700 thousand ounces ($19.84 per ounce average realized price).

b. Includes $109 million ($0.48 per pound) of fixed costs charged directly to cost of sales as a result of the impact of export restrictions on PT-FI's operating rates.

c. Represents the combined total for all other mining operations and the related eliminations, as presented in Note 10.

### Africa Mining Product Revenues, Production Costs and Unit Net Cash Costs

*(In millions)*

| Three Months Ended June 30, 2015 | By-Product Method | Co-Product Method Copper | Cobalt |  | Total |
| --- | ---: | ---: | ---: | --- | ---: |
| Revenues, excluding adjustmentsa | $275 | $275 | $76 |  | $351 |
| Site production and delivery, before net noncash and other costs shown below | 161 | 141 | 45 |  | 186 |
| Cobalt creditsb | (55) | — | — |  | — |
| Royalty on metals | 6 | 5 | 1 |  | 6 |
| Net cash costs | 112 | 146 | 46 |  | 192 |
| Depreciation, depletion and amortization | 57 | 45 | 12 |  | 57 |
| Noncash and other costs, net | 4 | 3 | 1 |  | 4 |
| Total costs | 173 | 194 | 59 |  | 253 |
| Revenue adjustments, primarily for pricing on prior period open sales | 2 | 2 | 4 |  | 6 |
| Gross profit | $104 | $83 | $21 |  | $104 |
| Copper sales (millions of recoverable pounds) | 104 | 104 |  |  |  |
| Cobalt sales (millions of contained pounds) |  |  | 8 |  |  |
| Gross profit per pound of copper/cobalt: |  |  |  |  |  |
| Revenues, excluding adjustmentsa | $2.63 | $2.63 | $9.27 |  |  |
| Site production and delivery, before net noncash and other costs shown below | 1.54 | 1.35 | 5.48 |  |  |
| Cobalt creditsb | (0.53) | — | — |  |  |
| Royalty on metals | 0.06 | 0.05 | 0.16 |  |  |
| Unit net cash costs | 1.07 | 1.40 | 5.64 |  |  |
| Depreciation, depletion and amortization | 0.55 | 0.43 | 1.42 |  |  |
| Noncash and other costs, net | 0.03 | 0.03 | 0.10 |  |  |
| Total unit costs | 1.65 | 1.86 | 7.16 |  |  |
| Revenue adjustments, primarily for pricing |  |  |  |  |  |
| on prior period open sales | 0.02 | 0.02 | 0.50 |  |  |
| Gross profit per pound | $1.00 | $0.79 | $2.61 |  |  |
| Reconciliation to Amounts Reported |  |  |  |  |  |
| (In millions) | Revenues | Production and Delivery | Depreciation, Depletion and Amortization |  |  |
| Totals presented above | $351 | $186 | $57 |  |  |
| Royalty on metals | (6) | — | — |  |  |
| Noncash and other costs, net | — | 4 | — |  |  |
| Revenue adjustments, primarily for pricing on prior period open sales | 6 | — | — |  |  |
| Africa mining | 351 | 190 | 57 |  |  |
| Other mining & eliminationsc | 3,328 | 2,375 | 345 |  |  |
| Total mining | 3,679 | 2,565 | 402 |  |  |
| U.S. oil & gas operations | 569 | 281 | 3,171 | d |  |
| Corporate, other & eliminations | — | 2 | 3 |  |  |
| As reported in FCX’s consolidated financial statements | $4,248 | $2,848 | $3,576 | d |  |

a. Includes point-of-sale transportation costs as negotiated in customer contracts.

c. Represents the combined total for all other mining operations and the related eliminations, as presented in Note 10.

d. Includes impairment of oil and gas properties of $2.7 billion.

### Africa Mining Product Revenues, Production Costs and Unit Net Cash Costs (continued)

*(In millions)*

| Three Months Ended June 30, 2014 | By-Product Method | Co-Product Method Copper | Cobalt | Total |
| --- | ---: | ---: | ---: | ---: |
| Revenues, excluding adjustmentsa | $362 | $362 | $65 | $427 |
| Site production and delivery, before net noncash and other costs shown below | 171 | 159 | 35 | 194 |
| Cobalt creditsb | (41) | — | — | — |
| Royalty on metals | 8 | 7 | 1 | 8 |
| Net cash costs | 138 | 166 | 36 | 202 |
| Depreciation, depletion and amortization | 63 | 54 | 9 | 63 |
| Noncash and other costs, net | 4 | 3 | 1 | 4 |
| Total costs | 205 | 223 | 46 | 269 |
| Revenue adjustments, primarily for pricing on prior period open sales | — | — | (1) | (1) |
| Gross profit | $157 | $139 | $18 | $157 |
| Copper sales (millions of recoverable pounds) | 118 | 118 |  |  |
| Cobalt sales (millions of contained pounds) |  |  | 7 |  |
| Gross profit per pound of copper/cobalt: |  |  |  |  |
| Revenues, excluding adjustmentsa | $3.08 | $3.08 | $9.58 |  |
| Site production and delivery, before net noncash and other costs shown below | 1.46 | 1.35 | 5.22 |  |
| Cobalt creditsb | (0.34) | — | — |  |
| Royalty on metals | 0.06 | 0.06 | 0.15 |  |
| Unit net cash costs | 1.18 | 1.41 | 5.37 |  |
| Depreciation, depletion and amortization | 0.54 | 0.46 | 1.30 |  |
| Noncash and other costs, net | 0.03 | 0.03 | 0.08 |  |
| Total unit costs | 1.75 | 1.90 | 6.75 |  |
| Revenue adjustments, primarily for pricing |  |  |  |  |
| on prior period open sales | — | — | (0.19) |  |
| Gross profit per pound | $1.33 | $1.18 | $2.64 |  |
| Reconciliation to Amounts Reported |  |  |  |  |
| (In millions) | Revenues | Production and Delivery | Depreciation, Depletion and Amortization |  |
| Totals presented above | $427 | $194 | $63 |  |
| Royalty on metals | (8) | — | — |  |
| Noncash and other costs, net | — | 4 | — |  |
| Revenue adjustments, primarily for pricing on prior period open sales | (1) | — | — |  |
| Africa mining | 418 | 198 | 63 |  |
| Other mining & eliminationsc | 3,868 | 2,556 | 331 |  |
| Total mining | 4,286 | 2,754 | 394 |  |
| U.S. oil & gas operations | 1,236 | 329 | 616 |  |
| Corporate, other & eliminations | — | (1) | 3 |  |
| As reported in FCX’s consolidated financial statements | $5,522 | $3,082 | $1,013 |  |

a. Includes point-of-sale transportation costs as negotiated in customer contracts.

c. Represents the combined total for all other mining operations and the related eliminations, as presented in Note 10.

### Africa Mining Product Revenues, Production Costs and Unit Net Cash Costs (continued)

*(In millions)*

| Six Months Ended June 30, 2015 | By-Product Method | Co-Product Method Copper | Cobalt |  | Total |
| --- | ---: | ---: | ---: | --- | ---: |
| Revenues, excluding adjustmentsa | $631 | $631 | $152 |  | $783 |
| Site production and delivery, before net noncash and other costs shown below | 370 | 325 | 92 |  | 417 |
| Cobalt creditsb | (104) | — | — |  | — |
| Royalty on metals | 14 | 12 | 2 |  | 14 |
| Net cash costs | 280 | 337 | 94 |  | 431 |
| Depreciation, depletion and amortization | 130 | 109 | 21 |  | 130 |
| Noncash and other costs, net | 8 | 6 | 2 |  | 8 |
| Total costs | 418 | 452 | 117 |  | 569 |
| Revenue adjustments, primarily for pricing on prior period open sales | (7) | (7) | (1) |  | (8) |
| Gross profit | $206 | $172 | $34 |  | $206 |
| Copper sales (millions of recoverable pounds) | 237 | 237 |  |  |  |
| Cobalt sales (millions of contained pounds) |  |  | 16 |  |  |
| Gross profit per pound of copper/cobalt: |  |  |  |  |  |
| Revenues, excluding adjustmentsa | $2.66 | $2.66 | $9.23 |  |  |
| Site production and delivery, before net noncash |  |  |  |  |  |
| and other costs shown below | 1.56 | 1.37 | 5.54 |  |  |
| Cobalt creditsb | (0.44) | — | — |  |  |
| Royalty on metals | 0.06 | 0.05 | 0.15 |  |  |
| Unit net cash costs | 1.18 | 1.42 | 5.69 |  |  |
| Depreciation, depletion and amortization | 0.55 | 0.46 | 1.31 |  |  |
| Noncash and other costs, net | 0.03 | 0.03 | 0.08 |  |  |
| Total unit costs | 1.76 | 1.91 | 7.08 |  |  |
| Revenue adjustments, primarily for pricing |  |  |  |  |  |
| on prior period open sales | (0.03) | (0.03) | (0.04) |  |  |
| Gross profit per pound | $0.87 | $0.72 | $2.11 |  |  |
| Reconciliation to Amounts Reported |  |  |  |  |  |
| (In millions) | Revenues | Production and Delivery | Depreciation, Depletion and Amortization |  |  |
| Totals presented above | $783 | $417 | $130 |  |  |
| Royalty on metals | (14) | — | — |  |  |
| Noncash and other costs, net | — | 8 | — |  |  |
| Revenue adjustments, primarily for pricing on prior period open sales | (8) | — | — |  |  |
| Africa mining | 761 | 425 | 130 |  |  |
| Other mining & eliminationsc | 6,571 | 4,766 | 677 |  |  |
| Total mining | 7,332 | 5,191 | 807 |  |  |
| U.S. oil & gas operations | 1,069 | 564 | 6,805 | d |  |
| Corporate, other & eliminations | — | 5 | 7 |  |  |
| As reported in FCX’s consolidated financial statements | $8,401 | $5,760 | $7,619 | d |  |

a. Includes point-of-sale transportation costs as negotiated in customer contracts.

c. Represents the combined total for all other mining operations and the related eliminations, as presented in Note 10.

d. Includes impairment of oil and gas properties of $5.8 billion.

### Africa Mining Product Revenues, Production Costs and Unit Net Cash Costs (continued)

*(In millions)*

| Six Months Ended June 30, 2014 | By-Product Method | Co-Product Method Copper | Cobalt | Total |
| --- | ---: | ---: | ---: | ---: |
| Revenues, excluding adjustmentsa | $621 | $621 | $137 | $758 |
| Site production and delivery, before net noncash and other costs shown below | 296 | 262 | 77 | 339 |
| Cobalt creditsb | (96) | — | — | — |
| Royalty on metals | 14 | 12 | 2 | 14 |
| Net cash costs | 214 | 274 | 79 | 353 |
| Depreciation, depletion and amortization | 114 | 99 | 15 | 114 |
| Noncash and other costs, net | 11 | 10 | 1 | 11 |
| Total costs | 339 | 383 | 95 | 478 |
| Revenue adjustments, primarily for pricing on prior period open sales | (1) | (1) | 2 | 1 |
| Gross profit | $281 | $237 | $44 | $281 |
| Copper sales (millions of recoverable pounds) | 202 | 202 |  |  |
| Cobalt sales (millions of contained pounds) |  |  | 15 |  |
| Gross profit per pound of copper/cobalt: |  |  |  |  |
| Revenues, excluding adjustmentsa | $3.08 | $3.08 | $9.29 |  |
| Site production and delivery, before net noncash |  |  |  |  |
| and other costs shown below | 1.47 | 1.30 | 5.19 |  |
| Cobalt creditsb | (0.48) | — | — |  |
| Royalty on metals | 0.07 | 0.06 | 0.16 |  |
| Unit net cash costs | 1.06 | 1.36 | 5.35 |  |
| Depreciation, depletion and amortization | 0.57 | 0.49 | 1.03 |  |
| Noncash and other costs, net | 0.05 | 0.04 | 0.09 |  |
| Total unit costs | 1.68 | 1.89 | 6.47 |  |
| Revenue adjustments, primarily for pricing |  |  |  |  |
| on prior period open sales | (0.01) | (0.01) | 0.13 |  |
| Gross profit per pound | $1.39 | $1.18 | $2.95 |  |
| Reconciliation to Amounts Reported |  |  |  |  |
| (In millions) | Revenues | Production and Delivery | Depreciation, Depletion and Amortization |  |
| Totals presented above | $758 | $339 | $114 |  |
| Royalty on metals | (14) | — | — |  |
| Noncash and other costs, net | — | 11 | — |  |
| Revenue adjustments, primarily for pricing on prior period open sales | 1 | — | — |  |
| Africa mining | 745 | 350 | 114 |  |
| Other mining & eliminationsc | 7,265 | 4,830 | 626 |  |
| Total mining | 8,010 | 5,180 | 740 |  |
| U.S. oil & gas operations | 2,497 | 640 | 1,232 |  |
| Corporate, other & eliminations | — | (1) | 7 |  |
| As reported in FCX’s consolidated financial statements | $10,507 | $5,819 | $1,979 |  |

a. Includes point-of-sale transportation costs as negotiated in customer contracts.

c. Represents the combined total for all other mining operations and the related eliminations, as presented in Note 10.

### Molybdenum Mines Product Revenues, Production Costs and Unit Net Cash Costs

*(In millions)*

|  | Three Months Ended June 30, 2015 |  | 2014 |  |  |  |
| --- | ---: | --- | ---: | --- | ---: | --- |
| Revenues, excluding adjustmentsa | $112 |  | $181 |  |  |  |
| Site production and delivery, before net noncash and other costs shown below | 80 |  | 79 |  |  |  |
| Treatment charges and other | 10 |  | 11 |  |  |  |
| Net cash costs | 90 |  | 90 |  |  |  |
| Depreciation, depletion and amortization | 25 |  | 24 |  |  |  |
| Noncash and other costs, net | 4 | b | 2 |  |  |  |
| Total costs | 119 |  | 116 |  |  |  |
| Gross (loss) profit | $(7) |  | $65 |  |  |  |
| Molybdenum sales (millions of recoverable pounds)a | 13 |  | 14 |  |  |  |
| Gross profit per pound of molybdenum: |  |  |  |  |  |  |
| Revenues, excluding adjustmentsa | $9.00 |  | $12.90 |  |  |  |
| Site production and delivery, before net noncash and other costs shown below | 6.35 |  | 5.64 |  |  |  |
| Treatment charges and other | 0.84 |  | 0.83 |  |  |  |
| Unit net cash costs | 7.19 |  | 6.47 |  |  |  |
| Depreciation, depletion and amortization | 1.97 |  | 1.69 |  |  |  |
| Noncash and other costs, net | 0.37 | b | 0.10 |  |  |  |
| Total unit costs | 9.53 |  | 8.26 |  |  |  |
| Gross (loss) profit per pound | $(0.53) |  | $4.64 |  |  |  |
| Reconciliation to Amounts Reported |  |  |  |  |  |  |
| (In millions) |  |  |  |  |  |  |
| Three Months Ended June 30, 2015 | Revenues |  | Production and Delivery |  | Depreciation, Depletion and Amortization |  |
| Totals presented above | $112 |  | $80 |  | $25 |  |
| Treatment charges and other | (10) |  | — |  | — |  |
| Noncash and other costs, net | — |  | 4 | b | — |  |
| Molybdenum mines | 102 |  | 84 |  | 25 |  |
| Other mining & eliminationsc | 3,577 |  | 2,481 |  | 377 |  |
| Total mining | 3,679 |  | 2,565 |  | 402 |  |
| U.S. oil & gas operations | 569 |  | 281 |  | 3,171 | d |
| Corporate, other & eliminations | — |  | 2 |  | 3 |  |
| As reported in FCX’s consolidated financial statements | $4,248 |  | $2,848 |  | $3,576 | d |
| Three Months Ended June 30, 2014 |  |  |  |  |  |  |
| Totals presented above | $181 |  | $79 |  | $24 |  |
| Treatment charges and other | (11) |  | — |  | — |  |
| Noncash and other costs, net | — |  | 2 |  | — |  |
| Molybdenum mines | 170 |  | 81 |  | 24 |  |
| Other mining & eliminationsc | 4,116 |  | 2,673 |  | 370 |  |
| Total mining | 4,286 |  | 2,754 |  | 394 |  |
| U.S. oil & gas operations | 1,236 |  | 329 |  | 616 |  |
| Corporate, other & eliminations | — |  | (1) |  | 3 |  |
| As reported in FCX’s consolidated financial statements | $5,522 |  | $3,082 |  | $1,013 |  |

a. Reflects sales of the Molybdenum mines' production to our molybdenum sales company at market-based pricing. On a consolidated basis, realizations are based on the actual contract terms for sales to third parties; as a result, our consolidated average realized price per pound of molybdenum will differ from the amounts reported in this table.

b. Includes charges totaling $3 million ($0.21 per pound) for LCM inventory adjustments.

c. Represents the combined total for all other mining operations and the related eliminations, as presented in Note 10. Also includes amounts associated with our molybdenum sales company, which includes sales of molybdenum produced by the Molybdenum mines and by certain of the North and South America copper mines.

d. Includes impairment of oil and gas properties of $2.7 billion.

### Molybdenum Mines Product Revenues, Production Costs and Unit Net Cash Costs (continued)

*(In millions)*

|  | Six Months Ended June 30, 2015 |  | 2014 |  |  |  |
| --- | ---: | --- | ---: | --- | ---: | --- |
| Revenues, excluding adjustmentsa | $236 |  | $318 |  |  |  |
| Site production and delivery, before net noncash and other costs shown below | 161 |  | 154 |  |  |  |
| Treatment charges and other | 21 |  | 22 |  |  |  |
| Net cash costs | 182 |  | 176 |  |  |  |
| Depreciation, depletion and amortization | 51 |  | 46 |  |  |  |
| Noncash and other costs, net | 6 | b | 3 |  |  |  |
| Total costs | 239 |  | 225 |  |  |  |
| Gross (loss) profit | $(3) |  | $93 |  |  |  |
| Molybdenum sales (millions of recoverable pounds)a | 26 |  | 27 |  |  |  |
| Gross profit per pound of molybdenum: |  |  |  |  |  |  |
| Revenues, excluding adjustmentsa | $9.34 |  | $11.88 |  |  |  |
| Site production and delivery, before net noncash and other costs shown below | 6.34 |  | 5.75 |  |  |  |
| Treatment charges and other | 0.84 |  | 0.83 |  |  |  |
| Unit net cash costs | 7.18 |  | 6.58 |  |  |  |
| Depreciation, depletion and amortization | 2.00 |  | 1.72 |  |  |  |
| Noncash and other costs, net | 0.25 | b | 0.10 |  |  |  |
| Total unit costs | 9.43 |  | 8.40 |  |  |  |
| Gross (loss) profit per pound | $(0.09) |  | $3.48 |  |  |  |
| Reconciliation to Amounts Reported |  |  |  |  |  |  |
| (In millions) |  |  |  |  |  |  |
| Six Months Ended June 30, 2015 | Revenues |  | Production and Delivery |  | Depreciation, Depletion and Amortization |  |
| Totals presented above | $236 |  | $161 |  | $51 |  |
| Treatment charges and other | (21) |  | — |  | — |  |
| Noncash and other costs, net | — |  | 6 | b | — |  |
| Molybdenum mines | 215 |  | 167 |  | 51 |  |
| Other mining & eliminationsc | 7,117 |  | 5,024 |  | 756 |  |
| Total mining | 7,332 |  | 5,191 |  | 807 |  |
| U.S. oil & gas operations | 1,069 |  | 564 |  | 6,805 | d |
| Corporate, other & eliminations | — |  | 5 |  | 7 |  |
| As reported in FCX’s consolidated financial statements | $8,401 |  | $5,760 |  | $7,619 | d |
| Six Months Ended June 30, 2014 |  |  |  |  |  |  |
| Totals presented above | $318 |  | $154 |  | $46 |  |
| Treatment charges and other | (22) |  | — |  | — |  |
| Noncash and other costs,net | — |  | 3 |  | — |  |
| Molybdenum mines | 296 |  | 157 |  | 46 |  |
| Other mining & eliminationsc | 7,714 |  | 5,023 |  | 694 |  |
| Total mining | 8,010 |  | 5,180 |  | 740 |  |
| U.S. oil & gas operations | 2,497 |  | 640 |  | 1,232 |  |
| Corporate, other & eliminations | — |  | (1) |  | 7 |  |
| As reported in FCX’s consolidated financial statements | $10,507 |  | $5,819 |  | $1,979 |  |

a. Reflects sales of the Molybdenum mines' production to our molybdenum sales company at market-based pricing. On a consolidated basis, realizations are based on the actual contract terms for sales to third parties; as a result, our consolidated average realized price per pound of molybdenum will differ from the amounts reported in this table.

b. Includes charges totaling $3 million ($0.11 per pound) for LCM inventory adjustments.

c. Represents the combined total for all other mining operations and the related eliminations, as presented in Note 10. Also includes amounts associated with our molybdenum sales company, which includes sales of molybdenum produced by the Molybdenum mines and by certain of the North and South America copper mines.

d. Includes impairment of oil and gas properties of $5.8 billion.

### U.S. Oil & Gas Product Revenues, Cash Production Costs and Realizations

*(In millions)*

| Three Months Ended June 30, 2015 | Oil | Natural Gas | NGLs | Total U.S. Oil & Gas |
| --- | ---: | ---: | ---: | ---: |
| Oil and gas revenues before derivatives | $480 | $63 | $12 | $555 |
| Cash gains on derivative contracts | 101 | — | — | 101 |
| Realized revenues | $581 | $63 | $12 | 656 |
| Less: cash production costs |  |  |  | 249 |
| Cash operating margin |  |  |  | 407 |
| Less: depreciation, depletion and amortization |  |  |  | 485 |
| Less: impairment of oil and gas properties |  |  |  | 2,686 |
| Less: accretion and other costs |  |  |  | 32 |
| Plus: net noncash mark-to-market losses on derivative contracts |  |  |  | (95) |
| Plus: other net adjustments |  |  |  | 8 |
| Gross loss |  |  |  | $(2,883) |
| Oil (MMBbls) | 8.6 |  |  |  |
| Gas (Bcf) |  | 23.5 |  |  |
| NGLs (MMBbls) |  |  | 0.6 |  |
| Oil Equivalents (MMBOE) |  |  |  | 13.1 |
|  | Oil (per barrel) | Natural Gas (per MMBtu) | NGLs (per barrel) | Per BOE |
| Oil and gas revenues before derivatives | $55.82 | $2.66 | $20.50 | $42.31 |
| Cash gains on derivative contracts | 11.79 | — | — | 7.73 |
| Realized revenues | $67.61 | $2.66 | $20.50 | 50.04 |
| Less: cash production costs |  |  |  | 19.04 |
| Cash operating margin |  |  |  | 31.00 |
| Less: depreciation, depletion and amortization |  |  |  | 36.99 |
| Less: impairment of oil and gas properties |  |  |  | 204.91 |
| Less: accretion and other costs |  |  |  | 2.46 |
| Plus: net noncash mark-to-market losses on derivative contracts |  |  |  | (7.26) |
| Plus: other net adjustments |  |  |  | 0.61 |
| Gross loss |  |  |  | $(220.01) |
| Reconciliation to Amounts Reported |  |  |  |  |
| (In millions) | Revenues | Production and Delivery | Depreciation, Depletion and Amortization |  |
| Totals presented above | $555 | $249 | $485 |  |
| Cash gains on derivative contracts | 101 | — | — |  |
| Net noncash mark-to-market losses on derivative contracts | (95) | — | — |  |
| Accretion and other costs | — | 32 | — |  |
| Impairment of oil and gas properties | — | — | 2,686 |  |
| Other net adjustments | 8 | — | — |  |
| U.S. oil & gas operations | 569 | 281 | 3,171 |  |
| Total mininga | 3,679 | 2,565 | 402 |  |
| Corporate, other & eliminations | — | 2 | 3 |  |
| As reported in FCX's consolidated financial statements | $4,248 | $2,848 | $3,576 |  |

a. Represents the combined total for mining operations and the related eliminations, as presented in Note 10.

*U.S. Oil & Gas Product Revenues, Cash Production Costs and Realizations (continued)*

*(In millions)*

| Three Months Ended June 30, 2014 | Oil | Natural Gas | NGLs | Total U.S. Oil & Gas |  |
| --- | ---: | ---: | ---: | ---: | --- |
| Oil and gas revenues before derivatives | $1,172 | $96 | $38 | $1,306 | a |
| Cash losses on derivative contracts | (57) | (6) | — | (63) |  |
| Realized revenues | $1,115 | $90 | $38 | 1,243 |  |
| Less: cash production costs |  |  |  | 314 | a |
| Cash operating margin |  |  |  | 929 |  |
| Less: depreciation, depletion and amortization |  |  |  | 616 |  |
| Less: accretion and other costs |  |  |  | 15 |  |
| Plus: net noncash mark-to-market losses on derivative contracts |  |  |  | (7) |  |
| Plus: other net adjustments |  |  |  | — |  |
| Gross profit |  |  |  | $291 |  |
| Oil (MMBbls) | 11.7 |  |  |  |  |
| Gas (Bcf) |  | 20.3 |  |  |  |
| NGLs (MMBbls) |  |  | 1.0 |  |  |
| Oil Equivalents (MMBOE) |  |  |  | 16.0 |  |
|  | Oil | Natural Gas | NGLs |  |  |
|  | (per barrel) | (per MMBtu) | (per barrel) | Per BOE |  |
| Oil and gas revenues before derivatives | $100.46 | $4.70 | $38.79 | $81.47 | a |
| Cash losses on derivative contracts | (4.96) | (0.26) | — | (3.94) |  |
| Realized revenues | $95.50 | $4.44 | $38.79 | 77.53 |  |
| Less: cash production costs |  |  |  | 19.57 | a |
| Cash operating margin |  |  |  | 57.96 |  |
| Less: depreciation, depletion and amortization |  |  |  | 38.39 |  |
| Less: accretion and other costs |  |  |  | 0.94 |  |
| Plus: net noncash mark-to-market losses on derivative contracts |  |  |  | (0.44) |  |
| Plus: other net adjustments |  |  |  | 0.04 |  |
| Gross profit |  |  |  | $18.23 |  |
| Reconciliation to Amounts Reported |  |  |  |  |  |
| (In millions) | Revenues | Production and Delivery | Depreciation, Depletion and Amortization |  |  |
| Totals presented above | $1,306 | $314 | $616 |  |  |
| Cash losses on derivative contracts | (63) | — | — |  |  |
| Net noncash mark-to-market losses on derivative contracts | (7) | — | — |  |  |
| Accretion and other costs | — | 15 | — |  |  |
| Other net adjustments | — | — | — |  |  |
| U.S. oil & gas operations | 1,236 | 329 | 616 |  |  |
| Total miningb | 4,286 | 2,754 | 394 |  |  |
| Corporate, other & eliminations | — | (1) | 3 |  |  |
| As reported in FCX's consolidated financial statements | $5,522 | $3,082 | $1,013 |  |  |

a. Following is a reconciliation of FM O&G's second-quarter 2014 cash production costs per BOE, excluding Eagle Ford:

|  | Cash Production Costs (in millions) | Oil Equivalents (MMBOE) | Cash Production Costs Per BOE |
| --- | ---: | ---: | ---: |
| Presented above | $314 | 16.0 | $19.57 |
| Less: Eagle Ford | 53 | 4.0 | 13.23 |
|  | $261 | 12.0 | $21.66 |

b. Represents the combined total for mining operations and the related eliminations, as presented in Note 10.

### U.S. Oil & Gas Product Revenues, Cash Production Costs and Realizations (continued)

*(In millions)*

| Six Months Ended June 30, 2015 | Oil | Natural Gas | NGLs | Total U.S. Oil & Gas |
| --- | ---: | ---: | ---: | ---: |
| Oil and gas revenues before derivatives | $853 | $125 | $24 | $1,002 |
| Cash gains on derivative contracts | 201 | — | — | 201 |
| Realized revenues | $1,054 | $125 | $24 | 1,203 |
| Less: cash production costs |  |  |  | 503 |
| Cash operating margin |  |  |  | 700 |
| Less: depreciation, depletion and amortization |  |  |  | 1,015 |
| Less: impairment of oil and gas properties |  |  |  | 5,790 |
| Less: accretion and other costs |  |  |  | 61 |
| Plus: net noncash mark-to-market losses on derivative contracts |  |  |  | (143) |
| Plus: other net adjustments |  |  |  | 9 |
| Gross loss |  |  |  | $(6,300) |
| Oil (MMBbls) | 17.0 |  |  |  |
| Gas (Bcf) |  | 45.3 |  |  |
| NGLs (MMBbls) |  |  | 1.1 |  |
| Oil Equivalents (MMBOE) |  |  |  | 25.6 |
|  | Oil (per barrel) | Natural Gas (per MMBtu) | NGLs (per barrel) | Per BOE |
| Oil and gas revenues before derivatives | $50.25 | $2.75 | $21.71 | $39.08 |
| Cash gains on derivative contracts | 11.88 | — | — | 7.87 |
| Realized revenues | $62.13 | $2.75 | $21.71 | 46.95 |
| Less: cash production costs |  |  |  | 19.62 |
| Cash operating margin |  |  |  | 27.33 |
| Less: depreciation, depletion and amortization |  |  |  | 39.59 |
| Less: impairment of oil and gas properties |  |  |  | 225.89 |
| Less: accretion and other costs |  |  |  | 2.39 |
| Plus: net noncash mark-to-market losses on derivative contracts |  |  |  | (5.60) |
| Plus: other net adjustments |  |  |  | 0.34 |
| Gross loss |  |  |  | $(245.80) |
| Reconciliation to Amounts Reported |  |  |  |  |
| (In Millions) | Revenues | Production and Delivery | Depreciation, Depletion and Amortization |  |
| Totals presented above | $1,002 | $503 | $1,015 |  |
| Cash gains on derivative contracts | 201 | — | — |  |
| Net noncash mark-to-market losses on derivative contracts | (143) | — | — |  |
| Accretion and other costs | — | 61 | — |  |
| Impairment of oil and gas properties | — | — | 5,790 |  |
| Other net adjustments | 9 | — | — |  |
| U.S. oil & gas operations | 1,069 | 564 | 6,805 |  |
| Total mininga | 7,332 | 5,191 | 807 |  |
| Corporate, other & eliminations | — | 5 | 7 |  |
| As reported in FCX's consolidated financial statements | $8,401 | $5,760 | $7,619 |  |

a. Represents the combined total for mining operations and the related eliminations, as presented in Note 10.

### U.S. Oil & Gas Product Revenues, Cash Production Costs and Realizations (continued)

*(In millions)*

| Six Months Ended June 30, 2014 | Oil | Natural Gas | NGLs | Total U.S. Oil & Gas |  |
| --- | ---: | ---: | ---: | ---: | --- |
| Oil and gas revenues before derivatives | $2,334 | $194 | $88 | $2,616 | a |
| Cash losses on derivative contracts | (115) | (13) | — | (128) |  |
| Realized revenues | $2,219 | $181 | $88 | 2,488 |  |
| Less: cash production costs |  |  |  | 612 | a |
| Cash operating margin |  |  |  | 1,876 |  |
| Less: depreciation, depletion and amortization |  |  |  | 1,232 |  |
| Less: accretion and other costs |  |  |  | 28 |  |
| Plus: net noncash mark-to-market gains on derivative contracts |  |  |  | 8 |  |
| Plus: other net adjustments |  |  |  | 1 |  |
| Gross profit |  |  |  | $625 |  |
| Oil (MMBbls) | 23.5 |  |  |  |  |
| Gas (Bcf) |  | 39.8 |  |  |  |
| NGLs (MMBbls) |  |  | 2.1 |  |  |
| Oil Equivalents (MMBOE) |  |  |  | 32.2 |  |
|  | Oil (per barrel) | Natural Gas (per MMBtu) | NGLs (per barrel) | Per BOE |  |
| Oil and gas revenues before derivatives | $99.54 | $4.87 | $42.35 | $81.34 | a |
| Cash losses on derivative contracts | (4.91) | (0.32) | — | (3.97) |  |
| Realized revenues | $94.63 | $4.55 | $42.35 | 77.37 |  |
| Less: cash production costs |  |  |  | 19.03 | a |
| Cash operating margin |  |  |  | 58.34 |  |
| Less: depreciation, depletion and amortization |  |  |  | 38.30 |  |
| Less: accretion and other costs |  |  |  | 0.87 |  |
| Plus: net noncash mark-to-market gains on derivative contracts |  |  |  | 0.23 |  |
| Plus: other net adjustments |  |  |  | 0.04 |  |
| Gross profit |  |  |  | $19.44 |  |
| Reconciliation to Amounts Reported for the Six Months Ended June 30, 2014 |  |  |  |  |  |
| (In millions) | Revenues | Production and Delivery | Depreciation, Depletion and Amortization |  |  |
| Totals presented above | $2,616 | $612 | $1,232 |  |  |
| Cash losses on derivative contracts | (128) | — | — |  |  |
| Net noncash mark-to-market gains on derivative contracts | 8 | — | — |  |  |
| Accretion and other costs | — | 28 | — |  |  |
| Other net adjustments | 1 | — | — |  |  |
| U.S. oil & gas operations | 2,497 | 640 | 1,232 |  |  |
| Total miningb | 8,010 | 5,180 | 740 |  |  |
| Corporate, other & eliminations | — | (1) | 7 |  |  |
| As reported in FCX's consolidated financial statements | $10,507 | $5,819 | $1,979 |  |  |

a. Following is a reconciliation of FM O&G's cash production costs per BOE for the first six months of 2014, excluding Eagle Ford:

|  | Cash Production Costs (in millions) | Oil Equivalents (MMBOE) | Cash Production Costs Per BOE |
| --- | ---: | ---: | ---: |
| Presented above | $612 | 32.2 | $19.03 |
| Less: Eagle Ford | 113 | 8.7 | 12.97 |
|  | $499 | 23.5 | $21.29 |

b. Represents the combined total for mining operations and the related eliminations, as presented in Note 10.

### CAUTIONARY STATEMENT

Our discussion and analysis contains forward-looking statements in which we discuss factors we believe may affect our future performance. Forward-looking statements are all statements other than statements of historical facts, such as projections or expectations relating to ore grades and milling rates; production and sales volumes; unit net cash costs; cash production costs per BOE; operating cash flows; capital expenditures; exploration efforts and results; development and production activities and costs; liquidity; tax rates; the impact of copper, gold, molybdenum, cobalt, crude oil and natural gas price changes; the impact of derivative positions; the impact of deferred intercompany profits on earnings; reserve estimates; future dividend payments; debt reduction and share purchases. The words “anticipates,” “may,” “can,” “plans,” “believes,” “potential,” “estimates,” “expects,” “projects,” “targets,” “intends,” “likely,” “will,” “should,” “to be” and any similar expressions are intended to identify those assertions as forward-looking statements. The declaration of dividends is at the discretion of the Board and will depend on our financial results, cash requirements, future prospects, and other factors deemed relevant by the Board.

We caution readers that forward-looking statements are not guarantees of future performance and actual results may differ materially from those anticipated, projected or assumed in the forward-looking statements. In particular, on July 28, 2015, we announced that we are undertaking a comprehensive review of operating plans to target significant additional reductions in capital spending, and operating and administrative costs. As part of this process, on August 5, 2015, we announced revisions to our oil and gas capital expenditure and production outlook. We expect to report revised plans for our mining operations during third-quarter 2015.

Important factors that can cause our actual results to differ materially from those anticipated in the forward-looking statements include supply of and demand for, and prices of copper, gold, molybdenum, cobalt, crude oil and natural gas, mine sequencing, production rates, industry risks, regulatory changes, political risks, drilling results, potential additional oil and gas property impairment charges, potential LCM inventory adjustments, potential impairment of long-lived mining assets, the outcome of negotiations with the Indonesian government regarding PT-FI's COW, PT-FI's ability to obtain renewal of its export license after January 28, 2016, PT-FI's ability to renew its bi-annual labor agreement expiring in September 2015, PT Smelting's ability to restart smelter operations as expected in September 2015, the potential effects of violence in Indonesia, the resolution of administrative disputes in the DRC, weather- and climate-related risks, labor relations, environmental risks, litigation results and other factors described in more detail in Part I, Item 1A. “Risk Factors” of our annual report on Form 10-K for the year ended December 31, 2014, as updated by our subsequent filings with the SEC.

Investors are cautioned that many of the assumptions upon which our forward-looking statements are based are likely to change after the forward-looking statements are made, including for example commodity prices, which we cannot control, and production volumes and costs, some aspects of which we may not be able to control. Further, we may make changes to our business plans that could affect our results. We caution investors that, except for our expectation that we will report revised plans for our mining operations during third-quarter 2015, we do not intend to update forward-looking statements more frequently than quarterly notwithstanding any changes in our assumptions, changes in business plans, actual experience or other changes, and we undertake no obligation to update any forward-looking statements.

## Market risk

As filed, 754 characters.

There have been no material changes in our market risks during the three-month period ended June 30, 2015. For additional information on market risks, refer to “Disclosures About Market Risks” included in Part I, Item 2. of our annual report on Form 10-K for the year ended December 31, 2014. For projected sensitivities of our operating cash flow to changes in commodity prices, refer to “Outlook” in Part I, Item 2. of this quarterly report on Form 10-Q for the period ended June 30, 2015; for projected sensitivities of our provisionally priced copper sales and derivative instruments to changes in commodity prices refer to “Consolidated Results – Revenues” in Part I, Item 2. of this quarterly report on Form 10-Q for the period ended June 30, 2015.

## Controls and procedures

As filed, 824 characters.

(a) Evaluation of disclosure controls and procedures. Our chief executive officer and chief financial officer, with the participation of management, have evaluated the effectiveness of our “disclosure controls and procedures” (as defined in Rules 13a-15(e) and 15d-15(e) under the Securities Exchange Act of 1934) as of the end of the period covered by this quarterly report on Form 10-Q. Based on their evaluation, they have concluded that our disclosure controls and procedures are effective as of June 30, 2015.

(b) Changes in internal control over financial reporting. There has been no change in our internal control over financial reporting that occurred during the quarter ended June 30, 2015, that has materially affected, or is reasonably likely to materially affect, our internal control over financial reporting.

## Risk factors

As filed, 264 characters.

There have been no material changes to our risk factors during the three-month period ended June 30, 2015 . For additional information on risk factors, refer to Part I, Item 1A. "Risk Factors" of our annual report on Form 10-K for the year ended December 31, 2014.

Filed Aug 10, 2015.
Source: SEC EDGAR, the filing index for accession 0000831259-15-000043. Last ingested by Listed: Nov 6, 2026, 13:42 ET. No prices; not investment advice.