# Freeport-Mcmoran Inc: Form 10-Q for the period ended Mar 31, 2018

- Company: [Freeport-Mcmoran Inc](/companies/fcx.md) (CIK 831259)
- Form: 10-Q
- Filed: 2018-05-04
- Accepted by EDGAR: May 4, 2018, 14:10 ET
- Period: 2018-03-31
- Accession: 0000831259-18-000016
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/831259/000083125918000016/fcxq11810-q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/831259/000083125918000016/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2018-03-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2018-01-01 to 2018-03-31 | $4.99bn | us-gaap:RevenueFromContractWithCustomerExcludingAssessedTax |
| Cost of revenue | 3 months, 2018-01-01 to 2018-03-31 | $3.26bn | us-gaap:CostOfRevenue |
| Selling, general and administrative | 3 months, 2018-01-01 to 2018-03-31 | $131.0m | us-gaap:SellingGeneralAndAdministrativeExpense |
| Operating income | 3 months, 2018-01-01 to 2018-03-31 | $1.46bn | us-gaap:OperatingIncomeLoss |
| Income tax | 3 months, 2018-01-01 to 2018-03-31 | $506.0m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2018-01-01 to 2018-03-31 | $817.0m | us-gaap:ProfitLoss |
| Diluted shares (weighted) | 3 months, 2018-01-01 to 2018-03-31 | 1,458,000,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months, 2018-01-01 to 2018-03-31 | $1.37bn | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 3 months, 2018-01-01 to 2018-03-31 | $402.0m | us-gaap:PaymentsToAcquireProductiveAssets |
| Dividends paid | 3 months, 2018-01-01 to 2018-03-31 | $0 | us-gaap:PaymentsOfDividendsCommonStock |
| Cash and equivalents | at 2018-03-31 | $3.70bn | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2018-03-31 | $10.11bn | us-gaap:AssetsCurrent |
| Total assets | at 2018-03-31 | $36.64bn | us-gaap:Assets |
| Current liabilities | at 2018-03-31 | $4.34bn | us-gaap:LiabilitiesCurrent |
| Total liabilities | at 2018-03-31 | $24.71bn | us-gaap:Liabilities |
| Long-term debt | at 2018-03-31 | $11.12bn | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2018-03-31 | $483.0m | us-gaap:DebtCurrent |
| Shareholders' equity | at 2018-03-31 | $8.66bn | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 100,895 characters.

*In Management’s Discussion and Analysis of Financial Condition and Results of Operations (MD&A), “we,” “us” and “our” refer to Freeport-McMoRan Inc. (FCX) and its consolidated subsidiaries. You should read this discussion in conjunction with our consolidated financial statements, the related MD&A and the discussion of our Business and Properties in our annual report on Form 10-K for the year ended December 31, 2017, filed with the United States (U.S.) Securities and Exchange Commission (SEC). The results of operations reported and summarized below are not necessarily indicative of future operating results (refer to “Cautionary Statement” for further discussion). References to “Notes” are Notes included in our Notes to Consolidated Financial Statements. Throughout MD&A, all references to income or losses per share are on a diluted basis.*

### OVERVIEW

We are a leading international mining company with headquarters in Phoenix, Arizona. We operate large, long-lived, geographically diverse assets with significant proven and probable reserves of copper, gold and molybdenum. We are the world’s largest publicly traded copper producer. Our portfolio of assets includes the Grasberg minerals district in Indonesia, one of the world’s largest copper and gold deposits; and significant mining operations in the Americas, including the large-scale Morenci minerals district in North America and the Cerro Verde operation in South America.

Net income attributable to common stock totaled $692 million in first-quarter 2018 and $228 million in first-quarter 2017. First-quarter 2018, compared with the 2017 period, benefited from higher copper and gold sales volumes and copper prices, partly offset by higher foreign income tax expense. Refer to “Consolidated Results” for further discussion.

During first-quarter 2018, we repaid borrowings totaling $1.5 billion, and in April 2018, we redeemed $404 million of senior notes due 2022 and $50 million of senior notes due 2023. During first-quarter 2018, our Board of Directors (Board) also reinstated a cash dividend on our common stock, and declared a quarterly cash dividend of $0.05 per share that was paid on May 1, 2018. Refer to Note 5 for further discussion.

At March 31, 2018, we had $3.7 billion in consolidated cash and cash equivalents and $11.6 billion in total debt. We had no borrowings and $3.5 billion available under our revolving credit facility. In April 2018, we entered into a new $3.5 billion, five-year, unsecured revolving credit facility with substantially similar structure and terms as our prior credit facility. Refer to Note 5 for further discussion.

We believe that we have a high-quality portfolio of long-lived copper assets positioned to generate long-term value. We continue to advance a project to develop the Lone Star oxide ores near the Safford operation in eastern Arizona. We are also pursuing other opportunities to enhance our mines’ net present values, and we continue to advance studies for future development of our copper resources, the timing of which will be dependent on market conditions.

As further discussed in Note 8, we continue to actively engage with Indonesian government officials to address regulatory changes that conflict with PT Freeport Indonesia’s (PT-FI) contractual rights in a manner that provides long-term stability for its operations and investment plans, and protects value for our stockholders. The parties have a mutual objective of completing negotiations and the required documentation as soon as possible. In December 2017, PT-FI was granted an extension of its temporary special license (IUPK) through June 30, 2018, to enable normal operations to continue during the negotiation period. In February 2018, PT-FI’s export license was extended to February 15, 2019. Until a definitive agreement is reached, PT-FI has reserved all rights under its Contract of Work (COW), including dispute resolution procedures.

As further discussed in Note 8, PT-FI is engaged in discussions with Indonesia's Ministry of Environment and Forestry regarding PT-FI’s controlled riverine tailings management system. Resolution of these matters is a requirement for concluding a comprehensive agreement for PT-FI's extended operations.

### OUTLOOK

We continue to view the long-term outlook for our business positively, supported by limitations on supplies of copper and by the requirements for copper in the world’s economy. Our financial results vary as a result of fluctuations in market prices primarily for copper, gold and molybdenum, as well as other factors. World market prices for these commodities have fluctuated historically and are affected by numerous factors beyond our control. Because we cannot control the price of our products, the key measures that management focuses on in operating our business are sales volumes, unit net cash costs, operating cash flow and capital expenditures.

Projections for 2018 and other forward looking statements in this quarterly report on Form 10-Q assume resolution of PT-FI’s long-term mining rights or an extension of its temporary IUPK after June 30, 2018. Refer to Note 8 for further discussion of Indonesia regulatory matters, which could have a significant impact on future results. For other important factors that could cause results to differ materially from projections, refer to “Cautionary Statement.”

### Consolidated Sales Volumes

Following are our projected consolidated sales volumes for the year 2018:

| Copper (millions of recoverable pounds): |  |  |
| --- | ---: | --- |
| North America copper mines | 1,475 |  |
| South America mining | 1,205 |  |
| Indonesia mining | 1,150 |  |
| **Total** | 3,830 |  |
| Gold (thousands of recoverable ounces) | 2,430 |  |
| Molybdenum (millions of recoverable pounds) | 95 | a |

a. Projected molybdenum sales include 35 million pounds produced by our Molybdenum mines and 60 million pounds produced by our North America and South America copper mines.

Consolidated sales volumes for second-quarter 2018 are expected to approximate 970 million pounds of copper, 700 thousand ounces of gold and 24 million pounds of molybdenum.

### Consolidated Unit Net Cash Costs

Assuming average prices of $1,300 per ounce of gold and $12.00 per pound of molybdenum for the remainder of 2018 and achievement of current sales volume and cost estimates, consolidated unit net cash costs (net of by-product credits) for our copper mines are expected to average $1.01 per pound of copper for the year 2018. The impact of price changes for the remainder of 2018 on consolidated unit net cash costs would approximate $0.025 per pound for each $50 per ounce change in the average price of gold and $0.02 per pound for each $2 per pound change in the average price of molybdenum. Quarterly unit net cash costs vary with fluctuations in sales volumes and realized prices, primarily for gold and molybdenum. Refer to “Consolidated Results – Production and Delivery Costs” for further discussion of consolidated production costs for our mining operations.

### Consolidated Operating Cash Flow

Our consolidated operating cash flows vary with sales volumes, prices realized from copper, gold and molybdenum sales, production costs, income taxes, other working capital changes and other factors. Based on current sales volume and cost estimates, and assuming average prices of $3.15 per pound of copper, $1,300 per ounce of gold and $12.00 per pound of molybdenum for the remainder of 2018, our consolidated operating cash flows are estimated to approximate $5.6 billion for the year 2018 (including $0.2 billion in working capital sources and timing of other tax payments). Projected consolidated operating cash flows for the year 2018 also reflect an estimated income tax provision of $2.1 billion (refer to “Consolidated Results – Income Taxes” for further discussion of our projected income tax rate for the year 2018). The impact of price changes during the remainder of 2018 on operating cash flows would approximate $250 million for each $0.10 per pound change in the average price of copper, $90 million for each $50 per ounce change in the average price of gold and $85 million for each $2 per pound change in the average price of molybdenum.

### Consolidated Capital Expenditures

Consolidated capital expenditures are expected to approximate $2.0 billion for the year 2018, including $1.1 billion for major mining projects primarily associated with underground development activities in the Grasberg minerals district and development of the Lone Star oxide project. If PT-FI is unable to reach a definitive agreement with the

Indonesian government on its long-term mining rights, we intend to reduce or defer investments significantly in underground development projects and will pursue dispute resolution procedures under PT-FI’s COW.

### MARKETS

World prices for copper, gold and molybdenum can fluctuate significantly. During the period from January 2008 through March 2018, the London Metal Exchange (LME) spot copper price varied from a low of $1.26 per pound in 2008 to a record high of $4.60 per pound in 2011; the London Bullion Market Association (London) PM gold price fluctuated from a low of $713 per ounce in 2008 to a record high of $1,895 per ounce in 2011; and the *Metals Week* Molybdenum Dealer Oxide weekly average price ranged from a low of $4.46 per pound in 2015 to a high of $33.88 per pound in 2008. Copper, gold and molybdenum prices are affected by numerous factors beyond our control as described further in “Risk Factors” contained in Part I, Item 1A. of our annual report on Form 10-K for the year ended December 31, 2017.

This graph presents LME spot copper prices and the combined reported stocks of copper at the LME, Commodity Exchange Inc. (COMEX), a division of the New York Mercantile Exchange (NYMEX), and the Shanghai Futures Exchange from January 2008 through March 2018. Beginning in mid-2014, copper prices declined because of concerns about slowing growth rates in China, a stronger U.S. dollar and a broad-based decline in commodity prices, but began to improve in fourth-quarter 2016 and throughout 2017. During first-quarter 2018, LME spot copper prices ranged from a low of $2.95 per pound to a high of $3.27 per pound, averaged $3.16 per pound and closed at $3.03 per pound on March 31, 2018. The LME spot copper price was $3.08 per pound on April 30, 2018.

We believe the underlying long-term fundamentals of the copper business remain positive, supported by the significant role of copper in the global economy and a challenging long-term supply environment attributable to difficulty in replacing existing large mines’ output with new production sources. Future copper prices are expected to be volatile and are likely to be influenced by demand from China and emerging markets, as well as economic activity in the U.S. and other industrialized countries, the timing of the development of new supplies of copper and the production levels of mines and copper smelters.

This graph presents London PM gold prices from January 2008 through March 2018. An improving economic outlook, stronger U.S. dollar and positive equity performance contributed to lower demand for gold since 2014. During first-quarter 2018, London PM gold prices ranged from a low of $1,308 per ounce to a high of $1,355 per ounce, averaged $1,329 per ounce, and closed at $1,324 per ounce on March 31, 2018. The London PM gold price was $1,313 per ounce on April 30, 2018.

This graph presents the *Metals Week* Molybdenum Dealer Oxide weekly average prices from January 2008 through March 2018. Molybdenum prices declined beginning in mid-2014 because of weaker demand from global steel and stainless steel producers but have rebounded starting in mid-2016 with further improvement in late-2017 and into 2018. During first-quarter 2018, the weekly average price of molybdenum ranged from a low of $11.03 per pound to a high of $12.97 per pound, averaged $12.22 per pound, and was $12.66 per pound on March 31, 2018. The *Metals Week* Molybdenum Dealer Oxide weekly average price was $12.35 per pound on April 30, 2018.

### CONSOLIDATED RESULTS

*(in millions, except per share amounts)*

| SUMMARY FINANCIAL DATA | Three Months Ended March 31, 2018 |  | 2017 |  |
| --- | ---: | --- | ---: | --- |
| Revenuesa,b | $4,868 |  | $3,341 |  |
| Operating incomea,c | $1,459 |  | $597 | d,e,f |
| Net income from continuing operationsg | $828 | h | $268 |  |
| Net (loss) income from discontinued operationsi | $(11) |  | $38 |  |
| Net income attributable to common stock | $692 |  | $228 |  |
| Diluted net income (loss) per share of common stock: |  |  |  |  |
| Continuing operations | $0.48 |  | $0.13 |  |
| Discontinued operations | (0.01) |  | 0.03 |  |
|  | $0.47 |  | $0.16 |  |
| Diluted weighted-average common shares outstanding | 1,458 |  | 1,454 |  |
| Operating cash flowsj | $1,369 |  | $792 |  |
| Capital expenditures | $402 |  | $344 |  |
| At March 31: |  |  |  |  |
| Cash and cash equivalents | $3,702 |  | $4,001 |  |
| Total debt, including current portion | $11,606 |  | $15,363 |  |

a. As further detailed in Note 9, following is a summary of revenues and operating income (loss) by operating division (in millions):

| Revenues | Three Months Ended March 31, 2018 | 2017 |
| --- | ---: | ---: |
| North America copper mines | $1,308 | $1,095 |
| South America mining | 877 | 868 |
| Indonesia mining | 1,573 | 534 |
| Molybdenum mines | 95 | 63 |
| Rod & Refining | 1,393 | 1,115 |
| Atlantic Copper Smelting & Refining | 579 | 458 |
| Corporate, other & eliminations | (957) | (792) |
| Total revenues | $4,868 | $3,341 |
| Operating income (loss) |  |  |
| North America copper mines | $419 | $311 |
| South America mining | 205 | 260 |
| Indonesia mining | 896 | 151 |
| Molybdenum mines | 9 | (8) |
| Rod & Refining | 3 | 4 |
| Atlantic Copper Smelting & Refining | 10 | 10 |
| Corporate, other & eliminations | (83) | (131) |
| Total operating income | $1,459 | $597 |

b. Includes adjustments to embedded derivatives for provisionally priced concentrate and cathode sales (refer to Note 6).

c. First-quarter 2018 includes a gain on sales of assets totaling $11 million ($11 million to net income attributable to common stock or $0.01 per share), primarily reflecting adjustments to the fair value of contingent consideration related to the 2016 sale of onshore California oil and gas properties, which will continue to be adjusted through December 31, 2020. First-quarter 2017 includes a net gain on sales of assets totaling $23 million ($23 million to net income attributable to common stock or $0.01 per share) associated with oil and gas property sales, partly offset by adjustments to the fair value of the potential contingent consideration related to the 2016 sale of onshore California oil and gas properties.

d. Includes charges at mining operations totaling $40 million ($30 million to net income attributable to common stock or $0.02 per share) for costs charged directly to cost of sales as a result of the impact of regulatory restrictions on PT-FI’s concentrate exports and for asset impairments at Morenci.

e. Includes net charges at oil and gas operations totaling $1 million ($1 million to net income attributable to common stock or less than $0.01 per share) consisting of $21 million in selling, general and administrative expenses for contract termination costs, mostly offset by adjustments of $20 million in production and delivery costs for contingent payments related to 2016 drillship settlements.

f. Includes net charges to environmental obligations and related litigation reserves totaling $19 million ($19 million to net income attributable to common stock or $0.01 per share).

g. We defer recognizing profits on intercompany sales until final sales to third parties occur. Refer to “Operations – Smelting & Refining” for a summary of net impacts from changes in these deferrals.

h. Includes interest received by PT-FI with the refund of prior years' tax receivables totaling $24 million ($13 million to net income attributable to common stock or $0.01 per share).

i. Primarily reflects adjustments to the estimated fair value of contingent consideration related to the November 2016 sale of our interest in TF Holdings Limited (TFHL), which will continue to be adjusted through December 31, 2019.

j. Includes net working capital (uses) sources and timing of other tax payments of $(21) million in first-quarter 2018 and $189 million in first-quarter 2017.

| SUMMARY OPERATING DATA Copper (millions of recoverable pounds) | Three Months Ended March 31, 2018 | 2017 |
| --- | ---: | ---: |
| Production | 952 | 851 |
| Sales, excluding purchases | 993 | 809 |
| Average realized price per pound | $3.11 | $2.67 |
| Site production and delivery costs per pounda | $1.67 | $1.60 |
| Unit net cash costs per pounda | $0.98 | $1.39 |
| Gold (thousands of recoverable ounces) |  |  |
| Production | 599 | 239 |
| Sales, excluding purchases | 610 | 182 |
| Average realized price per ounce | $1,312 | $1,229 |
| Molybdenum (millions of recoverable pounds) |  |  |
| Production | 22 | 23 |
| Sales, excluding purchases | 24 | 24 |
| Average realized price per pound | $11.95 | $8.71 |

a. Reflects per pound weighted-average production and delivery costs and unit net cash costs (net of by-product credits) for all copper mines, before net noncash and other costs. For reconciliations of per pound unit costs by operating division to production and delivery costs applicable to sales reported in our consolidated financial statements, refer to “Product Revenues and Production Costs.”

### Revenues

Consolidated revenues totaled $4.9 billion in first-quarter 2018 and $3.3 billion in first-quarter 2017. Revenues from our mining operations primarily include the sale of copper concentrate, copper cathode, copper rod, gold in concentrate and molybdenum. Following is a summary of changes in our consolidated revenues between periods (in millions):

|  | Three Months Ended March 31 |
| --- | ---: |
| Consolidated revenues - 2017 period | $3,341 |
| Higher (lower) sales volumes: |  |
| Copper | 491 |
| Gold | 525 |
| Molybdenum | (1) |
| Higher average realized prices: |  |
| Copper | 437 |
| Gold | 51 |
| Molybdenum | 77 |
| Adjustments for prior period provisionally priced copper sales | (169) |
| Higher treatment charges | (29) |
| Higher revenues from purchased copper | 81 |
| Higher Atlantic Copper revenues | 121 |
| Other, including intercompany eliminations | (57) |
| Consolidated revenues - 2018 period | $4,868 |

Sales Volumes. Consolidated copper sales increased to 993 million pounds in first-quarter 2018, compared with 809 million pounds in first-quarter 2017, primarily reflecting higher operating rates in Indonesia. Consolidated gold sales volumes increased to 610 thousand ounces in first-quarter 2018, compared with 182 thousand ounces in first- quarter 2017, primarily reflecting higher ore grades and operating rates in Indonesia. Lower operating rates in first-quarter 2017 reflected the regulatory restrictions on PT-FI's concentrate exports from mid-January 2017 to mid-April 2017.

Consolidated molybdenum sales volumes of 24 million pounds in first-quarter 2018 approximated first-quarter 2017 sales of 24 million pounds.

Refer to “Operations” for further discussion of sales volumes at our mining operations.

Realized Prices. Our consolidated revenues can vary significantly as a result of fluctuations in the market prices of copper, gold and molybdenum. First-quarter 2018 average realized prices, compared with first-quarter 2017, were 16 percent higher for copper, 7 percent higher for gold and 37 percent higher for molybdenum. Refer to “Markets” for further discussion.

As discussed below, substantially all of our copper concentrate and cathode sales contracts provide final copper pricing in a specified future month. We record revenues and invoice customers at the time of shipment based on then-current LME prices, which results in an embedded derivative on provisionally priced concentrate and cathode sales that is adjusted to fair value through earnings each period until final pricing on the date of settlement. Average realized copper prices include net adjustments to current period provisionally priced copper sales totaling $(57) million in first-quarter 2018 and $16 million in first-quarter 2017. Refer to Notes 6 and 9 for a summary of total adjustments to prior period and current period provisionally priced sales.

Prior Period Provisionally Priced Copper Sales. Substantially all of our copper concentrate and cathode sales contracts provide final copper pricing in a specified future month (generally one to four months from the shipment date) based primarily on quoted LME monthly average spot copper prices. We receive market prices based on prices in the specified future period, which results in price fluctuations recorded through revenues until the date of settlement. We record revenues and invoice customers at the time of shipment based on then-current LME prices, which results in an embedded derivative on our provisionally priced concentrate and cathode sales that is adjusted to fair value through earnings each period, using the period-end forward prices, until final pricing on the date of settlement. To the extent final prices are higher or lower than what was recorded on a provisional basis, an increase or decrease to revenues is recorded each reporting period until the date of final pricing. Accordingly, in times of rising copper prices, our revenues benefit from adjustments to the final pricing of provisionally priced sales pursuant to contracts entered into in prior periods; in times of falling copper prices, the opposite occurs. Net adjustments to prior periods’ provisionally priced copper sales recorded in consolidated revenues totaled $(78) million in first-quarter 2018 and $91 million in first-quarter 2017. Refer to Notes 6 and 9 for a summary of total adjustments to prior period and current period provisionally priced sales.

At March 31, 2018, we had provisionally priced copper sales totaling 324 million pounds of copper (net of intercompany sales and noncontrolling interests) recorded at an average of $3.04 per pound, subject to final pricing over the next several months. We estimate that each $0.05 change in the price realized from the March 31, 2018, provisional price recorded would have an approximate $10 million effect on our 2018 net income attributable to common stock. The LME spot copper price was $3.08 per pound on April 30, 2018.

Treatment Charges. Revenues from our concentrate sales are recorded net of treatment charges. Higher treatment charges in first-quarter 2018, compared with first-quarter 2017, primarily reflect higher sales volumes from Indonesia.

Purchased Copper. We purchase copper cathode primarily for processing by our Rod & Refining operations. Purchased copper volumes totaled 74 million pounds in first-quarter 2018, compared with 58 million pounds in first-quarter 2017.

Atlantic Copper Revenues. Atlantic Copper revenues totaled $579 million in first-quarter 2018, compared with $458 million in first-quarter 2017. Higher revenues in first-quarter 2018, compared with first-quarter 2017, primarily reflect higher copper sales volumes and higher copper prices.

### Production and Delivery Costs

Consolidated production and delivery costs totaled $2.8 billion in first-quarter 2018 and $2.2 billion in first-quarter 2017. Higher consolidated production and delivery costs in first-quarter 2018, compared with first-quarter 2017, primarily reflect higher mining rates and repair and maintenance costs.

Mining Unit Site Production and Delivery Costs. Site production and delivery costs for our copper mining operations primarily include labor, energy and commodity-based inputs, such as sulphuric acid, reagents, liners, tires and explosives. Consolidated unit site production and delivery costs (before net noncash and other costs) for our copper mines averaged $1.67 per pound of copper in first-quarter 2018, compared with $1.60 per pound of copper in first-quarter 2017. Higher consolidated unit site production and delivery costs in first-quarter 2018, compared with first-quarter 2017, primarily reflect higher mining rates and higher repair and maintenance costs. Refer to “Operations – Unit Net Cash Costs” for further discussion of unit net cash costs associated with our operating divisions and to “Product Revenues and Production Costs” for reconciliations of per pound costs by operating division to production and delivery costs applicable to sales reported in our consolidated financial statements.

### Depreciation, Depletion and Amortization

Depreciation will vary under the unit-of-production (UOP) method as a result of changes in sales volumes and the related UOP rates at our mining operations. Consolidated depreciation, depletion and amortization (DD&A) totaled $451 million in first-quarter 2018, compared with $389 million in first-quarter 2017. Higher DD&A in first-quarter 2018, compared with first-quarter 2017, primarily reflected higher sales volumes at PT-FI.

### Selling, General and Administrative Expenses

Consolidated selling, general and administrative expenses totaled $131 million in first-quarter 2018 and $151 million in first-quarter 2017 (which included net charges of $21 million for contract termination costs at our oil and gas operations).

### Mining Exploration and Research Expenses

Consolidated exploration and research expenses for our mining operations totaled $21 million in first-quarter 2018 and $14 million in first-quarter 2017. Our mining exploration activities are generally associated with our existing mines, focusing on opportunities to expand reserves and resources to support development of additional future production capacity. Exploration results continue to indicate opportunities for significant future potential reserve additions in North America and South America. Exploration spending is expected to approximate $72 million for the year 2018.

### Environmental Obligations and Shutdown Costs

Environmental obligation costs reflect net revisions to our long-term environmental obligations, which vary from period to period because of changes to environmental laws and regulations, the settlement of environmental matters and/or circumstances affecting our operations that could result in significant changes in our estimates. Shutdown costs include care-and-maintenance costs and any litigation, remediation or related expenditures associated with closed facilities or operations. Net charges for environmental obligations and shutdown costs totaled $9 million in first-quarter 2018 and $25 million in first-quarter 2017.

### Net Gain on Sales of Assets

Net gain on sales of assets totaled $11 million in first-quarter 2018, primarily reflecting adjustments to the fair value of the potential $150 million in contingent consideration related to the 2016 sale of onshore California oil and gas properties, which will continue to be adjusted through December 31, 2020. Net gain on sales of assets totaled $23 million in first-quarter 2017, including gains of $17 million related to the sale of Madden property interests and $16 million of adjustments related to the December 2016 Deepwater Gulf of Mexico sale, partly offset by adjustments of $10 million to the fair value of contingent consideration related to the December 2016 onshore California sale.

### Interest Expense, Net

Consolidated interest costs (before capitalization) totaled $176 million in first-quarter 2018 and $195 million in first-quarter 2017. Lower interest costs in first-quarter 2018, compared to first-quarter 2017, reflect a decrease in total debt.

Capitalized interest varies with the level of expenditures for our development projects and average interest rates on our borrowings, and totaled $25 million in first-quarter 2018 and $28 million in first-quarter 2017.

### Income Taxes

Following is a summary of the approximate amounts used in the calculation of our consolidated income tax provision (in millions, except percentages):

|  | Three Months Ended March 31, 2018 Incomea | Effective Tax Rate |  | Income Tax (Provision) Benefit | 2017 Incomea | Effective Tax Rate | Income Tax (Provision) Benefit |
| --- | ---: | ---: | --- | ---: | ---: | ---: | ---: |
| U.S. | $170 | (2)% |  | $4 | $10 | 70% | $(7) |
| South America | 183 | 39% |  | (72) | 260 | 39% | (101) |
| Indonesia | 933 | 43% |  | (401) | 152 | 44% | (67) |
| Eliminations and other | 50 | N/A |  | (3) | 16 | N/A | (1) |
| Rate adjustmentb | — | N/A |  | (34) | — | N/A | 2 |
| Consolidated FCX | $1,336 | 38% | c | $(506) | $438 | 40% | $(174) |

a. Represents income from continuing operations by geographic location before income taxes and equity in affiliated companies’ net (losses) earnings.

b. In accordance with applicable accounting rules, we adjust our interim provision for income taxes to equal our consolidated tax rate.

c. The consolidated effective income tax rate is a function of the combined effective tax rates for the jurisdictions in which we operate. Accordingly, variations in the relative proportions of jurisdictional income result in fluctuations to our consolidated effective income tax rate. Assuming achievement of current sales volume and cost estimates and average prices of $3.15 per pound for copper, $1,300 per ounce for gold and $12.00 per pound for molybdenum for the remainder of 2018, we estimate our consolidated effective tax rate for the year 2018 will approximate 36 percent and would decrease with higher prices.

### Net (Loss) Income from Discontinued Operations

Net (loss) income from discontinued operations of $(11) million in first-quarter 2018 and $38 million in first-quarter 2017, primarily reflected adjustments to the fair value of the potential $120 million contingent consideration related to the November 2016 sale of our interest in TFHL, which will continue to be adjusted through December 31, 2019.

### OPERATIONS

### North America Copper Mines

We operate seven open-pit copper mines in North America – Morenci, Bagdad, Safford, Sierrita and Miami in Arizona, and Chino and Tyrone in New Mexico. All of the North America mining operations are wholly owned, except for Morenci. We record our 72 percent undivided joint venture interest in Morenci using the proportionate consolidation method.

The North America copper mines include open-pit mining, sulfide ore concentrating, leaching and solution extraction/electrowinning (SX/EW) operations. A majority of the copper produced at our North America copper mines is cast into copper rod by our Rod & Refining segment. The remainder of our North America copper sales is in the form of copper cathode or copper concentrate, a portion of which is shipped to Atlantic Copper (our wholly owned smelter). Molybdenum concentrate, gold and silver are also produced by certain of our North America copper mines.

Operating and Development Activities. We have significant undeveloped reserves and resources in North America and a portfolio of potential long-term development projects. Future investments will be undertaken based on the results of economic and technical feasibility studies, and are dependent on market conditions. We continue to study opportunities to reduce the capital intensity of our potential long-term development projects.

Through exploration drilling, we have identified a significant resource at our wholly owned Lone Star project located near the Safford operation in eastern Arizona. We have commenced an initial project to develop the Lone Star oxide ores with first production expected by the end of 2020. Total estimated capital costs, including mine equipment and pre-production stripping, approximate $850 million and will benefit from the utilization of existing infrastructure at the adjacent Safford operation. At March 31, 2018, approximately $35 million has been incurred for this project. Production from the Lone Star oxide ores is expected to average approximately 200 million pounds of copper per year with an approximate 20-year mine life. The project also advances the potential for development of a larger-scale district opportunity. We are conducting additional drilling to follow up on positive exploration results as we continue to evaluate longer term opportunities available from the significant long-term sulfide potential in the Lone Star/Safford minerals district.

Operating Data. Following is a summary of consolidated operating data for the North America copper mines:

| Operating Data, Net of Joint Venture Interests Copper (millions of recoverable pounds) | Three Months Ended March 31, 2018 | 2017 |
| --- | ---: | ---: |
| Production | 348 | 392 |
| Sales, excluding purchases | 384 | 375 |
| Average realized price per pound | $3.16 | $2.68 |
| Molybdenum (millions of recoverable pounds) |  |  |
| Productiona | 7 | 9 |
| **100% Operating Data** |  |  |
| SX/EW operations |  |  |
| Leach ore placed in stockpiles (metric tons per day) | 674,600 | 701,800 |
| Average copper ore grade (percent) | 0.27 | 0.28 |
| Copper production (millions of recoverable pounds) | 262 | 277 |
| Mill operations |  |  |
| Ore milled (metric tons per day) | 288,600 | 303,800 |
| Average ore grade (percent): |  |  |
| Copper | 0.35 | 0.41 |
| Molybdenum | 0.02 | 0.03 |
| Copper recovery rate (percent) | 88.0 | 86.4 |
| Copper production (millions of recoverable pounds) | 151 | 186 |

a. Refer to “Consolidated Results” for our consolidated molybdenum sales volumes, which include sales of molybdenum produced at the North America copper mines.

North America’s consolidated copper sales volumes of 384 million pounds in first-quarter 2018 were higher than first-quarter 2017 sales of 375 million pounds, primarily reflecting timing of shipments. North America copper sales are estimated to approximate 1.5 billion pounds for the year 2018, compared with 1.5 billion pounds in 2017.

Unit Net Cash Costs. Unit net cash costs per pound of copper is a measure intended to provide investors with information about the cash-generating capacity of our mining operations expressed on a basis relating to the primary metal product for our respective operations. We use this measure for the same purpose and for monitoring operating performance by our mining operations. This information differs from measures of performance determined in accordance with U.S. GAAP and should not be considered in isolation or as a substitute for measures of performance determined in accordance with U.S. GAAP. This measure is presented by other metals mining companies, although our measure may not be comparable to similarly titled measures reported by other companies.

#### Gross Profit per Pound of Copper and Molybdenum

The following table summarizes unit net cash costs and gross profit per pound at our North America copper mines. Refer to “Product Revenues and Production Costs” for an explanation of the “by-product” and “co-product” methods and a reconciliation of unit net cash costs per pound to production and delivery costs applicable to sales reported in our consolidated financial statements.

|  | Three Months Ended March 31, 2018 By- Product Method Copper | Co-Product Method Molyb- denuma |  | 2017 By- Product Method Copper Molyb- denuma |  | Co-Product Method |  |
| --- | ---: | ---: | ---: | ---: | --- | ---: | ---: |
| Revenues, excluding adjustments | $3.16 | $3.16 | $10.87 | $2.68 |  | $2.68 | $7.00 |
| Site production and delivery, before net noncash and other costs shown below | 1.84 | 1.73 | 7.81 | 1.50 |  | 1.42 | 5.16 |
| By-product credits | (0.20) | — | — | (0.15) |  | — | — |
| Treatment charges | 0.10 | 0.09 | — | 0.11 |  | 0.11 | — |
| Unit net cash costs | 1.74 | 1.82 | 7.81 | 1.46 |  | 1.53 | 5.16 |
| DD&A | 0.25 | 0.23 | 0.66 | 0.31 |  | 0.29 | 0.52 |
| Noncash and other costs, net | 0.05 | 0.05 | 0.09 | 0.09 | b | 0.09 | 0.07 |
| Total unit costs | 2.04 | 2.10 | 8.56 | 1.86 |  | 1.91 | 5.75 |
| Other revenue adjustments, primarily for pricing on prior period open sales | (0.01) | (0.01) | — | 0.02 |  | 0.02 | — |
| Gross profit per pound | $1.11 | $1.05 | $2.31 | $0.84 |  | $0.79 | $1.25 |
| Copper sales (millions of recoverable pounds) | 383 | 383 |  | 374 |  | 374 |  |
| Molybdenum sales (millions of recoverable pounds)a |  |  | 7 |  |  |  | 9 |

a. Reflects sales of molybdenum produced by certain of the North America copper mines to our molybdenum sales company at market-based pricing.

b. Includes $19 million ($0.05 per pound of copper) for asset impairment charges at Morenci.

Our North America copper mines have varying cost structures because of differences in ore grades and characteristics, processing costs, by-product credits and other factors. Average unit net cash costs (net of by-product credits) for the North America copper mines of $1.74 per pound of copper in first-quarter 2018 were higher than unit net cash costs of $1.46 per pound in first-quarter 2017, primarily reflecting higher repair and maintenance costs.

Because certain assets are depreciated on a straight-line basis, North America’s average unit depreciation rate may vary with asset additions and the level of copper production and sales.

Average unit net cash costs (net of by-product credits) for our North America copper mines are expected to approximate $1.71 per pound of copper for the year 2018, based on achievement of current sales volume and cost estimates and assuming an average molybdenum price of $12.00 per pound for the remainder of 2018. North

America’s average unit net cash costs for the year 2018 would change by approximately $0.03 per pound for each $2 per pound change in the average price of molybdenum for the remainder of 2018.

### South America Mining

We operate two copper mines in South America – Cerro Verde in Peru (in which we own a 53.56 percent interest) and El Abra in Chile (in which we own a 51 percent interest), which are consolidated in our financial statements.

South America mining includes open-pit mining, sulfide ore concentrating, leaching and SX/EW operations. Production from our South America mines is sold as copper concentrate or cathode under long-term contracts. Our South America mines also sell a portion of their copper concentrate production to Atlantic Copper. In addition to copper, the Cerro Verde mine produces molybdenum concentrate and silver.

Operating and Development Activities. The Cerro Verde expansion project, which commenced operations in September 2015, achieved capacity operating rates in early 2016. The project expanded the concentrator facilities’ capacity from 120,000 metric tons of ore per day to 360,000 metric tons of ore per day. Cerro Verde’s expanded operations benefit from its large-scale, long-lived reserves and cost efficiencies. The project has continued to perform well, with average mill throughput rates of 385,500 metric tons of ore per day in first-quarter 2018, including a daily record of 462,900 metric tons of ore.

Exploration results at El Abra indicate a significant sulfide resource, which could potentially support a major mill project similar to facilities recently constructed at Cerro Verde. We continue to evaluate a major expansion at El

Abra to process additional sulfide material and to achieve higher recoveries. Future investments will depend on technical studies, which are being advanced, economic factors and market conditions.

Operating Data. Following is a summary of consolidated operating data for our South America mining operations:

| Copper (millions of recoverable pounds) | Three Months Ended March 31, 2018 | 2017 |
| --- | ---: | ---: |
| Production | 293 | 304 |
| Sales | 290 | 309 |
| Average realized price per pound | $3.08 | $2.66 |
| Molybdenum (millions of recoverable pounds) |  |  |
| Productiona | 6 | 6 |
| SX/EW operations |  |  |
| Leach ore placed in stockpiles (metric tons per day) | 168,000 | 120,100 |
| Average copper ore grade (percent) | 0.33 | 0.42 |
| Copper production (millions of recoverable pounds) | 67 | 66 |
| Mill operations |  |  |
| Ore milled (metric tons per day) | 385,500 | 338,900 |
| Average ore grade (percent): |  |  |
| Copper | 0.39 | 0.44 |
| Molybdenum | 0.01 | 0.02 |
| Copper recovery rate (percent) | 79.0 | 84.5 |
| Copper production (millions of recoverable pounds) | 226 | 238 |

a. Refer to “Consolidated Results” for our consolidated molybdenum sales volumes, which include sales of molybdenum produced at Cerro Verde.

South America’s consolidated copper sales volumes of 290 million pounds in first-quarter 2018 were lower than first-quarter 2017 sales of 309 million pounds, primarily reflecting lower ore grades and recovery rates at Cerro Verde. Copper sales from South America mines are expected to approximate 1.2 billion pounds of copper for the year 2018, compared with 1.2 billion pounds of copper in 2017.

Unit Net Cash Costs. Unit net cash costs per pound of copper is a measure intended to provide investors with information about the cash-generating capacity of our mining operations expressed on a basis relating to the primary metal product for our respective operations. We use this measure for the same purpose and for monitoring operating performance by our mining operations. This information differs from measures of performance determined in accordance with U.S. GAAP and should not be considered in isolation or as a substitute for measures of performance determined in accordance with U.S. GAAP. This measure is presented by other metals mining companies, although our measure may not be comparable to similarly titled measures reported by other companies.

#### Gross Profit per Pound of Copper

The following table summarizes unit net cash costs and gross profit per pound of copper at the South America mining operations. Unit net cash costs per pound of copper are reflected under the by-product and co-product methods as the South America mining operations also had sales of molybdenum and silver. Refer to “Product Revenues and Production Costs” for an explanation of the “by-product” and “co-product” methods and a reconciliation of unit net cash costs per pound to production and delivery costs applicable to sales reported in our consolidated financial statements.

|  | Three Months Ended March 31, 2018 By-Product Method | Co-Product Method | 2017 By-Product Method | Co-Product Method |
| --- | ---: | ---: | ---: | ---: |
| Revenues, excluding adjustments | $3.08 | $3.08 | $2.66 | $2.66 |
| Site production and delivery, before net noncash and other costs shown below | 1.78 | 1.64 | 1.48 | 1.38 |
| By-product credits | (0.25) | — | (0.18) | — |
| Treatment charges | 0.20 | 0.20 | 0.22 | 0.22 |
| Royalty on metals | 0.01 | 0.01 | 0.01 | 0.01 |
| Unit net cash costs | 1.74 | 1.85 | 1.53 | 1.61 |
| DD&A | 0.43 | 0.40 | 0.43 | 0.40 |
| Noncash and other costs, net | 0.05 | 0.05 | 0.01 | 0.01 |
| Total unit costs | 2.22 | 2.30 | 1.97 | 2.02 |
| Other revenue adjustments, primarily for pricing on prior period open sales | (0.15) | (0.15) | 0.16 | 0.16 |
| Gross profit per pound | $0.71 | $0.63 | $0.85 | $0.80 |
| Copper sales (millions of recoverable pounds) | 290 | 290 | 309 | 309 |

Our South America mines have varying cost structures because of differences in ore grades and characteristics, processing costs, by-product credits and other factors. Average unit net cash costs (net of by-product credits) of $1.74 per pound of copper in first-quarter 2018 were higher than unit net cash costs of $1.53 per pound in first-quarter 2017, primarily reflecting higher mining rates and lower ore grades.

Revenues from Cerro Verde’s concentrate sales are recorded net of treatment charges, which will vary with Cerro Verde’s sales volumes and the price of copper.

Because certain assets are depreciated on a straight-line basis, South America’s unit depreciation rate may vary with asset additions and the level of copper production and sales.

Revenue adjustments primarily result from changes in prices on provisionally priced copper sales recognized in prior periods. Refer to “Consolidated Results – Revenues” for further discussion of adjustments to prior period provisionally priced copper sales.

Average unit net cash costs (net of by-product credits) for our South America mining operations are expected to approximate $1.64 per pound of copper for the year 2018, based on current sales volume and cost estimates and assuming an average price of $12.00 per pound of molybdenum for the remainder of 2018.

### Indonesia Mining

Indonesia mining includes PT-FI’s Grasberg minerals district, one of the world’s largest copper and gold deposits, in Papua, Indonesia. We own 90.64 percent of PT-FI, including 9.36 percent owned through our wholly owned subsidiary, PT Indocopper Investama.

PT-FI operates a proportionately consolidated unincorporated joint venture with Rio Tinto plc (Rio Tinto), under which Rio Tinto has a 40 percent interest in certain assets and a 40 percent interest through 2022 in production exceeding specified annual amounts of copper, gold and silver. After 2022, all production and related revenues and costs are shared 60 percent PT-FI and 40 percent Rio Tinto. Refer to Note 3 in our annual report on Form 10-K for the year ended December 31, 2017, for discussion of our joint venture with Rio Tinto.

PT-FI produces copper concentrate that contains significant quantities of gold and silver. Substantially all of PT-FI’s copper concentrate is sold under long-term contracts, and during first-quarter 2018, approximately 40 percent of PT-FI’s concentrate production was sold to PT Smelting (PT-FI’s 25-percent-owned smelter and refinery in Gresik, Indonesia).

Regulatory Matters. As further discussed in Note 8, PT-FI continues to actively engage with Indonesian government officials to address regulatory changes that conflict with its contractual rights in a manner that provides long-term stability for PT-FI’s operations and investment plans, and protects value for our stockholders. The parties have a mutual objective of completing negotiations and the required documentation as soon as possible.

In December 2017, PT-FI was granted an extension of its temporary IUPK through June 30, 2018, to enable normal operations to continue during the negotiation period. In February 2018, PT-FI’s export license was extended to February 15, 2019. Until a definitive agreement is reached, PT-FI has reserved all rights under its COW, including dispute resolution procedures.

PT-FI is also engaged in discussions with Indonesia's Ministry of Environment and Forestry regarding PT-FI’s controlled riverine tailings management system. Resolution of these matters is a requirement for concluding a comprehensive agreement for PT-FI's extended operations.

We cannot predict whether PT-FI will be successful in reaching a satisfactory agreement on the terms of its long-term mining rights. If PT-FI is unable to reach a definitive agreement with the Indonesian government on its long-term mining rights, we intend to reduce or defer investments significantly in underground development projects and will pursue dispute resolution procedures under PT-FI’s COW. For further discussion of the regulatory matters and risks associated with operations in Indonesia, refer to Part I, Item IA. “Risk Factors” of our annual report on Form 10-K for the year ended December 31, 2017.

Operating and Development Activities. PT-FI is currently mining the final phase of the Grasberg open pit, which contains high copper and gold ore grades. PT-FI expects to mine high-grade ore until transitioning to the Grasberg Block Cave underground mine in the first half of 2019, resulting in lower copper and gold production from Indonesia mining during the transition period.

PT-FI has several projects in the Grasberg minerals district related to the development of its large-scale, long-lived, high-grade underground ore bodies. In aggregate, these underground ore bodies are expected to produce large-scale quantities of copper and gold following the transition from the Grasberg open pit. Substantial progress has been made to prepare for the transition to mining of the Grasberg Block Cave underground mine. Mine development activities are sufficiently advanced to commence caving in early 2019. The ore flow system and underground rail line are expected to be completed in the second half of 2018.

Subject to reaching a definitive agreement with the Indonesian government to support PT-FI’s long-term investment plans, estimated annual capital spending on these projects would average $0.8 billion per year ($0.7 billion per year net to PT-FI) over the next five years. Considering the long-term nature and size of these projects, actual costs could vary from these estimates. In response to market conditions and Indonesian regulatory uncertainty, the timing of these expenditures continues to be reviewed. If PT-FI is unable to reach a definitive agreement with the Indonesian government on its long-term mining rights, we intend to reduce or defer investments significantly in our underground development projects and will pursue dispute resolution procedures under PT-FI’s COW.

The following provides additional information on the continued development of the Common Infrastructure project, the Grasberg Block Cave underground mine and the Deep Mill Level Zone (DMLZ) ore body that lies below the Deep Ore Zone (DOZ) underground mine. Our current plans and mineral reserves in Indonesia assume that PT-FI’s long-term mining rights will be extended through 2041, as stated in the COW.

*Common Infrastructure and Grasberg Block Cave Mine.* In 2004, PT-FI commenced its Common Infrastructure project to provide access to its large undeveloped underground ore bodies located in the Grasberg minerals district through a tunnel system located approximately 400 meters deeper than its existing underground tunnel system. In addition to providing access to our underground ore bodies, the tunnel system will enable PT-FI to conduct future exploration in prospective areas associated with currently identified ore bodies. The tunnel system was completed to the Big Gossan terminal, and the Big Gossan mine was brought into production in 2010. The Big Gossan underground mine was on care-and-maintenance status during most of 2017 and production restarted in fourth-quarter 2017. Development of the DMLZ and Grasberg Block Cave underground mines is advancing using the Common Infrastructure project tunnels as access.

The Grasberg Block Cave underground mine accounts for approximately half of our recoverable proven and probable reserves in Indonesia. Production from the Grasberg Block Cave mine is expected to commence in the first half of 2019, following the end of mining of the Grasberg open pit. Targeted production rates once the Grasberg

Block Cave mining operation reaches full capacity are expected to approximate 130,000 to 160,000 metric tons of ore per day. PT-FI continues to review its operating plans to determine the optimum mine plan for the Grasberg Block Cave underground mine.

Aggregate mine development capital for the Grasberg Block Cave underground mine and associated Common Infrastructure is expected to approximate $6.4 billion (incurred between 2008 and 2023), with PT-FI’s share totaling approximately $5.9 billion. Aggregate project costs totaling $3.4 billion have been incurred through March 31, 2018, including $136 million during first-quarter 2018.

*DMLZ.* The DMLZ ore body lies below the DOZ mine at the 2,590-meter elevation and represents the downward continuation of mineralization in the Ertsberg East Skarn system and neighboring Ertsberg porphyry. In September 2015, PT-FI initiated pre-commercial production that represents ore extracted during the development phase for the purpose of obtaining access to the ore body. PT-FI continues to review its mine plan for the DMLZ underground mine, which is currently in pre-commercial production. In response to mining-induced seismic activity that began in 2017, the development plans have been revised to a slower ramp up to full production to assess alternatives to manage the rock stress encountered in the early phase of cave development. The DMLZ rock types and geologic setting are different than other ore bodies in the Grasberg minerals district. PT-FI currently expects DMLZ to ramp up to full capacity of 80,000 metric tons of ore per day in 2022. Near-term production plans will continue to be reviewed and potentially revised as additional data becomes available.

Drilling efforts continue to determine the extent of the ore body. Aggregate mine development capital costs for the DMLZ underground mine are expected to approximate $3.1 billion (incurred between 2009 and 2021), with PT-FI’s share totaling approximately $1.9 billion. Aggregate project costs totaling $2.2 billion have been incurred through March 31, 2018, including $75 million during first-quarter 2018.

Other Matters. As further discussed in “Risk Factors” contained in Part I. Item 1A of our annual report on Form 10-K for the year ended December 31, 2017, there have been a series of shooting incidents within the PT-FI project area and in nearby areas. During March and April 2018, there were six additional shooting incidents, which did not result in any injuries. The safety of our workforce is a critical concern, and PT-FI continues to work with the Indonesian government to address security issues. We also continue to limit the use of the road leading to our mining and milling operations to secured convoys.

Operating Data. Following is a summary of consolidated operating data for our Indonesia mining operations:

| Operating Data, Net of Joint Venture Interest Copper (millions of recoverable pounds) | Three Months Ended March 31, 2018 | 2017 |
| --- | ---: | ---: |
| Production | 311 | 155 |
| Sales | 319 | 125 |
| Average realized price per pound | $3.06 | $2.63 |
| Gold (thousands of recoverable ounces) |  |  |
| Production | 595 | 232 |
| Sales | 603 | 177 |
| Average realized price per ounce | $1,312 | $1,229 |
| **100% Operating Data** |  |  |
| Ore milled (metric tons per day):a |  |  |
| Grasberg open pit | 125,200 | 53,600 |
| DOZ underground mine | 39,400 | 26,100 |
| DMLZ underground mine | 2,600 | 3,200 |
| Grasberg Block Cave underground mine | 4,000 | 2,600 |
| Big Gossan underground mine | 2,400 | 1,700 |
| Total | 173,600 | 87,200 |
| Average ore grades: |  |  |
| Copper (percent) | 1.12 | 1.15 |
| Gold (grams per metric ton) | 1.63 | 1.17 |
| Recovery rates (percent): |  |  |
| Copper | 92.0 | 92.2 |
| Gold | 84.7 | 84.8 |
| Production: |  |  |
| Copper (millions of recoverable pounds) | 340 | 172 |
| Gold (thousands of recoverable ounces) | 673 | 241 |

a. Amounts represent the approximate average daily throughput processed at PT-FI’s mill facilities from each producing mine and from development activities that result in metal production.

Indonesia mining’s consolidated sales of 319 million pounds of copper and 603 thousand ounces of gold in first-quarter 2018 were higher than first-quarter 2017 sales of 125 million pounds of copper and 177 thousand ounces of gold, primarily reflecting higher operating rates and gold ore grades. Lower operating rates in first-quarter 2017 reflected the regulatory restrictions on PT-FI’s concentrate exports from mid-January 2017 to mid-April 2017.

Sales volumes from Indonesia mining are expected to approximate 1.15 billion pounds of copper and 2.4 million ounces of gold for the year 2018, compared with 1.0 billion pounds of copper and 1.5 million ounces of gold for the year 2017. Indonesia mining’s projected sales volumes and unit net cash credits (refer to discussion below) for the year 2018 are dependent on a number of factors, including operational performance, workforce productivity, timing of shipments, and Indonesia regulatory matters, including the resolution of PT-FI’s long-term mining rights or an extension of PT-FI’s temporary IUPK after June 30, 2018. Refer to Note 8 for further discussion.

Unit Net Cash Costs. Unit net cash costs per pound of copper is a measure intended to provide investors with information about the cash-generating capacity of our mining operations expressed on a basis relating to the primary metal product for our respective operations. We use this measure for the same purpose and for monitoring operating performance by our mining operations. This information differs from measures of performance determined in accordance with U.S. GAAP and should not be considered in isolation or as a substitute for measures of performance determined in accordance with U.S. GAAP. This measure is presented by other metals mining companies, although our measure may not be comparable to similarly titled measures reported by other companies.

45

#### Gross Profit per Pound of Copper and per Ounce of Gold

The following table summarizes the unit net cash costs and gross profit per pound of copper and per ounce of gold at our Indonesia mining operations. Refer to “Product Revenues and Production Costs” for an explanation of “by-product” and “co-product” methods and a reconciliation of unit net cash costs per pound to production and delivery costs applicable to sales reported in our consolidated financial statements.

|  | Three Months Ended March 31, 2018 By-Product Method Copper | Co-Product Method Gold | Copper | 2017 By-Product Method Gold |  | Co-Product Method |  |
| --- | ---: | ---: | ---: | ---: | --- | ---: | ---: |
| Revenues, excluding adjustments | $3.06 | $3.06 | $1,312 | $2.63 |  | $2.63 | $1,229 |
| Site production and delivery, before net noncash and other costs shown below | 1.36 | 0.75 | 319 | 2.13 |  | 1.26 | 589 |
| Gold and silver credits | (2.59) | — | — | (1.88) |  | — | — |
| Treatment charges | 0.25 | 0.13 | 57 | 0.28 |  | 0.17 | 77 |
| Export duties | 0.14 | 0.08 | 34 | 0.11 |  | 0.07 | 31 |
| Royalty on metals | 0.21 | 0.11 | 49 | 0.16 |  | 0.09 | 45 |
| Unit net cash (credits) costs | (0.63) | 1.07 | 459 | 0.80 |  | 1.59 | 742 |
| DD&A | 0.57 | 0.31 | 133 | 0.66 |  | 0.39 | 184 |
| Noncash and other costs, net | 0.04 | 0.02 | 11 | 0.26 | a | 0.15 | 72 |
| Total unit (credit) costs | (0.02) | 1.40 | 603 | 1.72 |  | 2.13 | 998 |
| Other revenue adjustments, primarily for pricing on prior period open sales | (0.12) | (0.12) | 27 | 0.33 |  | 0.33 | 51 |
| PT Smelting intercompany (loss) profit | (0.03) | (0.02) | (7) | 0.21 |  | 0.13 | 59 |
| Gross profit per pound/ounce | $2.93 | $1.52 | $729 | $1.45 |  | $0.96 | $341 |
| Copper sales (millions of recoverable pounds) | 319 | 319 |  | 125 |  | 125 |  |
| Gold sales (thousands of recoverable ounces) |  |  | 603 |  |  |  | 177 |

a. Includes $21 million ($0.17 per pound of copper) of costs charged directly to cost of sales as a result of the impact of regulatory restrictions on PT-FI’s concentrate exports.

A significant portion of PT-FI’s costs are fixed, and unit costs vary depending on production volumes and other factors. As a result of higher sales volumes and gold and silver credits, Indonesia had unit net cash credits (including gold and silver credits) of $0.63 per pound of copper in first-quarter 2018, compared with unit net cash costs of $0.80 per pound of copper in first-quarter 2017.

Treatment charges vary with the volume of metals sold and the price of copper, and royalties vary with the volume of metals sold and the prices of copper and gold. PT-FI’s royalties totaled $67 million in first-quarter 2018 and $19 million in first-quarter 2017. Export duties totaled $46 million in first-quarter 2018 and $14 million in first-quarter 2017.

Because certain assets are depreciated on a straight-line basis, PT-FI’s unit depreciation rate varies with the level of copper production.

Revenue adjustments primarily result from changes in prices on provisionally priced copper sales recognized in prior periods. Refer to “Consolidated Results – Revenues” for further discussion of adjustments to prior period provisionally priced copper sales.

PT Smelting intercompany (loss) profit represents the change in the deferral of 25 percent of PT-FI’s profit on sales to PT Smelting. Refer to “Smelting & Refining” below for further discussion.

Assuming an average gold price of $1,300 per ounce for the remainder of 2018 and achievement of current sales volume and cost estimates, unit net cash credits (including gold and silver credits) for Indonesia mining are expected to approximate $0.55 per pound of copper for the year 2018. Indonesia mining’s unit net cash credits for the year 2018 would change by approximately $0.09 per pound for each $50 per ounce change in the average price of gold for the remainder of 2018. Because of the fixed nature of a large portion of Indonesia’s costs, unit net cash credits/costs vary from quarter to quarter depending on copper and gold volumes.

### Molybdenum Mines

We have two wholly owned molybdenum mines in North America – the Henderson underground mine and the Climax open-pit mine, both in Colorado. The Henderson and Climax mines produce high-purity, chemical-grade molybdenum concentrate, which is typically further processed into value-added molybdenum chemical products. The majority of the molybdenum concentrate produced at the Henderson and Climax mines, as well as from our North America and South America copper mines, is processed at our own conversion facilities.

Operating and Development Activities. Production from the Molybdenum mines totaled 9 million pounds of molybdenum in first-quarter 2018 and 8 million pounds in first-quarter 2017. Refer to “Consolidated Results” for our consolidated molybdenum operating data, which includes sales of molybdenum produced at our Molybdenum mines, and from our North America and South America copper mines, and refer to “Outlook” for projected consolidated molybdenum sales volumes.

Unit Net Cash Costs Per Pound of Molybdenum. Unit net cash costs per pound of molybdenum is a measure intended to provide investors with information about the cash-generating capacity of our mining operations expressed on a basis relating to the primary metal product for our respective operations. We use this measure for the same purpose and for monitoring operating performance by our mining operations. This information differs from measures of performance determined in accordance with U.S. GAAP and should not be considered in isolation or as a substitute for measures of performance determined in accordance with U.S. GAAP. This measure is presented by other metals mining companies, although our measure may not be comparable to similarly titled measures reported by other companies.

Unit net cash costs for our Molybdenum mines averaged $8.57 per pound of molybdenum in first-quarter 2018 and $7.02 per pound in first-quarter 2017. Based on current sales volume and cost estimates, average unit net cash costs for the Molybdenum mines are expected to approximate $8.75 per pound of molybdenum for the year 2018. Refer to “Product Revenues and Production Costs” for a reconciliation of unit net cash costs per pound to production and delivery costs applicable to sales reported in our consolidated financial statements.

### Smelting and Refining

We wholly own and operate a smelter in Arizona (Miami smelter), a refinery in Texas (El Paso refinery) and a smelter and refinery in Spain (Atlantic Copper). Additionally, PT-FI owns 25 percent of a smelter and refinery in Gresik, Indonesia (PT Smelting). Treatment charges for smelting and refining copper concentrate consist of a base rate per pound of copper and per ounce of gold and are generally fixed. Treatment charges represent a cost to our mining operations and income to Atlantic Copper and PT Smelting. Thus, higher treatment charges benefit our smelter operations and adversely affect our mining operations. Our North America copper mines are less significantly affected by changes in treatment charges because these operations are largely integrated with our Miami smelter and El Paso refinery. Through this form of downstream integration, we are assured placement of a significant portion of our concentrate production.

Atlantic Copper smelts and refines copper concentrate and markets refined copper and precious metals in slimes. During first-quarter 2018, approximately one-third of Atlantic Copper’s concentrate purchases were from our North America and South America copper mining operations, with the remainder purchased from third parties.

PT-FI’s contract with PT Smelting provides for PT-FI to supply 100 percent of the copper concentrate requirements (subject to a minimum or maximum rate) necessary for PT Smelting to produce 205,000 metric tons of copper annually on a priority basis. PT-FI may also sell copper concentrate to PT Smelting at market rates for quantities in excess of 205,000 metric tons of copper annually. During first-quarter 2018, PT-FI supplied all of PT Smelting’s concentrate requirements.

We defer recognizing profits on sales from our mining operations to Atlantic Copper and on 25 percent of PT-FI’s sales to PT Smelting until final sales to third parties occur. Changes in these deferrals attributable to variability in intercompany volumes resulted in net (reductions) additions to net income attributable to common stock of $(7) million in first-quarter 2018 and $27 million in first-quarter 2017. Our net deferred profits on our inventories at Atlantic Copper and PT Smelting to be recognized in future periods’ net income attributable to common stock totaled $95 million at March 31, 2018. Quarterly variations in ore grades, the timing of intercompany shipments and changes in product prices will result in variability in our net deferred profits and quarterly earnings.

### CAPITAL RESOURCES AND LIQUIDITY

Our consolidated operating cash flows vary with prices realized from copper, gold and molybdenum; our sales volumes; production costs; income taxes; other working capital changes; and other factors. We believe that we have a high-quality portfolio of long-lived copper assets positioned to generate long-term value. We have commenced a project to develop the Lone Star oxide ores near the Safford operation in eastern Arizona. We are also pursuing other opportunities to enhance net present values, and we continue to advance studies for future development of our copper resources, the timing of which will be dependent on market conditions.

### Cash

Following is a summary of the U.S. and international components of consolidated cash and cash equivalents available to the parent company, net of noncontrolling interests’ share, taxes and other costs at March 31, 2018 (in billions):

|  |  |
| --- | ---: |
| Cash at domestic companies | $2.5 |
| Cash at international operations | 1.2 |
| Total consolidated cash and cash equivalents | 3.7 |
| Noncontrolling interests’ share | (0.4) |
| Cash, net of noncontrolling interests’ share | 3.3 |
| Withholding taxes and other | (0.1) |
| Net cash available | $3.2 |

Cash held at our international operations is generally used to support our foreign operations’ capital expenditures, operating expenses, debt repayment, working capital and other tax payments, or other cash needs. Management believes that sufficient liquidity is available in the U.S. from cash balances and availability from our revolving credit facility. We have not elected to permanently reinvest earnings from our foreign subsidiaries, and we have recorded deferred tax liabilities for foreign earnings that are available to be repatriated to the U.S. From time to time, our foreign subsidiaries distribute earnings to the U.S. through dividends that are subject to applicable withholding taxes and noncontrolling interests’ share.

### Debt

Following is a summary of our total debt and the related weighted-average interest rates at March 31, 2018 (in billions, except percentages):

|  |  | Weighted- Average Interest Rate |
| --- | ---: | ---: |
| Senior Notes | $10.4 | 4.7% |
| Cerro Verde credit facility | 1.2 | 3.8% |
| Total debt | $11.6 | 4.6% |

At March 31, 2018, we had no borrowings, $13 million in letters of credit issued and availability of $3.5 billion under our revolving credit facility. In April 2018, we entered into a new $3.5 billion, five-year, unsecured revolving credit facility with substantially similar structure and terms as our prior facility, which was scheduled to mature in May 2019.

In April 2018, we redeemed $404 million of senior notes due 2022 and $50 million of senior notes due 2023. We expect to record a gain of $10 million in second-quarter 2018 related to these redemptions, and the aggregate annual cash interest savings approximates $30 million.

Refer to Note 5 for further discussion of debt.

### Operating Activities

We generated consolidated operating cash flows of $1.4 billion (net of $21 million in working capital uses and timing of other tax payments) in first-quarter 2018 and $792 million (including $189 million in working capital sources and timing of other tax payments) in first-quarter 2017. Higher operating cash flows in first-quarter 2018, compared to first-quarter 2017, primarily reflect higher copper and gold sales volumes and higher metals prices.

Subject to future commodity prices for copper, gold and molybdenum, we expect estimated consolidated operating cash flows for the year 2018, plus available cash and availability under our credit facility, to be sufficient to fund our budgeted capital expenditures, cash dividends, noncontrolling interest distributions and other cash requirements for the year. Refer to “Outlook” for further discussion of projected operating cash flows for the year 2018. For a discussion of regulatory matters in Indonesia that could have a significant impact on future results, refer to “Risk Factors,” contained in Part I, Item 1A. of our annual report on Form 10-K for the year ended December 31, 2017.

### Investing Activities

Capital Expenditures. Capital expenditures, including capitalized interest, totaled $402 million in first-quarter 2018, including $250 million for major mining projects. Capital expenditures, including capitalized interest, totaled $344 million in first-quarter 2017, including $210 million for major mining projects. Refer to “Outlook” for further discussion of projected capital expenditures for the year 2018.

### Financing Activities

Debt Transactions. Net repayments of debt in first-quarter 2018 totaled $1.5 billion, consisting of $1.4 billion for senior notes due March 2018 and $0.1 billion for the Cerro Verde credit facility.

Net repayments of debt in first-quarter 2017 totaled $0.7 billion primarily for the repayment of our senior notes due 2017 and payments on the Cerro Verde credit facility.

Dividends. In February 2018, the Board reinstated a cash dividend on our common stock. On March 28, 2018, the Board declared a quarterly cash dividend of $0.05 per share, which was paid May 1, 2018, to stockholders of record as of April 13, 2018. The declaration of dividends is at the discretion of our Board and will depend upon our financial results, cash requirements, future prospects and other factors deemed relevant by our Board.

Common stock dividends of $1 million in first-quarter 2017 related to accumulated dividends paid for vested stock-based compensation.

Cash dividends paid to noncontrolling interests totaled $80 million in first-quarter 2018 and $15 million in first-quarter 2017. These payments will vary based on the operating results and cash requirements of our consolidated subsidiaries.

### CONTRACTUAL OBLIGATIONS

There have been no material changes in our contractual obligations since December 31, 2017. Refer to Part II, Items 7. and 7A. in our annual report on Form 10-K for the year ended December 31, 2017, for information regarding our contractual obligations.

### CONTINGENCIES

### Environmental and Asset Retirement Obligations

Our current and historical operating activities are subject to stringent laws and regulations governing the protection of the environment. We perform a comprehensive annual review of our environmental and asset retirement obligations and also review changes in facts and circumstances associated with these obligations at least quarterly. There have been no material changes to our environmental and asset retirement obligations since December 31, 2017. Updated cost assumptions, including increases and decreases to cost estimates, changes in the anticipated scope and timing of remediation activities, and settlement of environmental matters may result in additional revisions to certain of our environmental obligations. Refer to Note 12 in our annual report on Form 10-K for the year ended December 31, 2017, for further information regarding our environmental and asset retirement obligations.

### Litigation and Other Contingencies

Other than as discussed in Note 8, there have been no material changes to our contingencies associated with legal proceedings, environmental and other matters since December 31, 2017. Refer to Note 12 and “Legal Proceedings” contained in Part I, Item 3. of our annual report on Form 10-K for the year ended December 31, 2017, for further information regarding legal proceedings, environmental and other matters.

### NEW ACCOUNTING STANDARDS

Refer to Note 11 for a summary of recently adopted accounting standards.

### PRODUCT REVENUES AND PRODUCTION COSTS

Unit net cash (credits) costs per pound of copper and molybdenum are measures intended to provide investors with information about the cash-generating capacity of our mining operations expressed on a basis relating to the primary metal product for the respective operations. We use this measure for the same purpose and for monitoring operating performance by our mining operations. This information differs from measures of performance determined in accordance with U.S. GAAP and should not be considered in isolation or as a substitute for measures of performance determined in accordance with U.S. GAAP. These measures are presented by other metals mining companies, although our measures may not be comparable to similarly titled measures reported by other companies.

We present gross profit per pound of copper in the following tables using both a “by-product” method and a “co-product” method. We use the by-product method in our presentation of gross profit per pound of copper because (i) the majority of our revenues are copper revenues, (ii) we mine ore, which contains copper, gold, molybdenum and other metals, (iii) it is not possible to specifically assign all of our costs to revenues from the copper, gold, molybdenum and other metals we produce and (iv) it is the method used by our management and our Board to monitor our mining operations and to compare mining operations in certain industry publications. In the co-product method presentations, shared costs are allocated to the different products based on their relative revenue values, which will vary to the extent our metals sales volumes and realized prices change.

We show revenue adjustments for prior period open sales as a separate line item. Because these adjustments do not result from current period sales, these amounts have been reflected separately from revenues on current period

sales. Noncash and other costs, which are removed from site production and delivery costs in the calculation of unit

net cash (credits) costs, consist of items such as stock-based compensation costs, start-up costs, inventory adjustments, long-lived asset impairments, restructuring and/or unusual charges. As discussed above, gold, molybdenum and other metal revenues at copper mines are reflected as credits against site production and delivery costs in the by-product method. The following schedules are presentations under both the by-product and co-product methods together with reconciliations to amounts reported in our consolidated financial statements.

50

### North America Copper Mines Product Revenues, Production Costs and Unit Net Cash Costs

*(In millions)*

| Three Months Ended March 31, 2018 | By-Product Method | Co-Product Method Copper | Molybdenuma | Otherb | Total |
| --- | ---: | ---: | ---: | ---: | ---: |
| Revenues, excluding adjustments | $1,209 | $1,209 | $76 | $23 | $1,308 |
| Site production and delivery, before net noncash |  |  |  |  |  |
| and other costs shown below | 705 | 660 | 55 | 13 | 728 |
| By-product credits | (76) | — | — | — | — |
| Treatment charges | 37 | 35 | — | 2 | 37 |
| Net cash costs | 666 | 695 | 55 | 15 | 765 |
| DD&A | 94 | 88 | 4 | 2 | 94 |
| Noncash and other costs, net | 19 | 18 | 1 | — | 19 |
| Total costs | 779 | 801 | 60 | 17 | 878 |
| Other revenue adjustments, primarily for pricing |  |  |  |  |  |
| on prior period open sales | (5) | (5) | — | — | (5) |
| Gross profit | $425 | $403 | $16 | $6 | $425 |
| Copper sales (millions of recoverable pounds) | 383 | 383 |  |  |  |
| Molybdenum sales (millions of recoverable pounds)a |  |  | 7 |  |  |
| Gross profit per pound of copper/molybdenum: |  |  |  |  |  |
| Revenues, excluding adjustments | $3.16 | $3.16 | $10.87 |  |  |
| Site production and delivery, before net noncash |  |  |  |  |  |
| and other costs shown below | 1.84 | 1.73 | 7.81 |  |  |
| By-product credits | (0.20) | — | — |  |  |
| Treatment charges | 0.10 | 0.09 | — |  |  |
| Unit net cash costs | 1.74 | 1.82 | 7.81 |  |  |
| DD&A | 0.25 | 0.23 | 0.66 |  |  |
| Noncash and other costs, net | 0.05 | 0.05 | 0.09 |  |  |
| Total unit costs | 2.04 | 2.10 | 8.56 |  |  |
| Other revenue adjustments, primarily for pricing |  |  |  |  |  |
| on prior period open sales | (0.01) | (0.01) | — |  |  |
| Gross profit per pound | $1.11 | $1.05 | $2.31 |  |  |
| Reconciliation to Amounts Reported |  |  |  |  |  |
| (In millions) |  |  |  |  |  |
|  |  | Production |  |  |  |
|  | Revenues | and Delivery | DD&A |  |  |
| Totals presented above | $1,308 | $728 | $94 |  |  |
| Treatment charges | (8) | 29 | — |  |  |
| Noncash and other costs, net | — | 19 | — |  |  |
| Other revenue adjustments, primarily for pricing |  |  |  |  |  |
| on prior period open sales | (5) | — | — |  |  |
| Eliminations and other | 13 | 15 | — |  |  |
| North America copper mines | 1,308 | 791 | 94 |  |  |
| Other miningc | 4,517 | 3,011 | 336 |  |  |
| Corporate, other & eliminations | (957) | (994) | 21 |  |  |
| As reported in FCX’s consolidated financial statements | $4,868 | $2,808 | $451 |  |  |

a. Reflects sales of molybdenum produced by certain of the North America copper mines to our molybdenum sales company at market-based pricing.

b. Includes gold and silver product revenues and production costs.

c. Represents the combined total for our other mining operations, including South America mining, Indonesia mining, Molybdenum mines, Rod & Refining and Atlantic Copper Smelting & Refining, as presented in Note 9.

### North America Copper Mines Product Revenues, Production Costs and Unit Net Cash Costs

*(In millions)*

| Three Months Ended March 31, 2017 | By-Product Method |  | Co-Product Method Copper | Molybdenuma | Otherb | Total |
| --- | ---: | --- | ---: | ---: | ---: | ---: |
| Revenues, excluding adjustments | $1,005 |  | $1,005 | $59 | $20 | $1,084 |
| Site production and delivery, before net noncash |  |  |  |  |  |  |
| and other costs shown below | 562 |  | 530 | 44 | 10 | 584 |
| By-product credits | (57) |  | — | — | — | — |
| Treatment charges | 42 |  | 41 | — | 1 | 42 |
| Net cash costs | 547 |  | 571 | 44 | 11 | 626 |
| DD&A | 116 |  | 110 | 4 | 2 | 116 |
| Noncash and other costs, net | 33 | c | 32 | 1 | — | 33 |
| Total costs | 696 |  | 713 | 49 | 13 | 775 |
| Other revenue adjustments, primarily for pricing |  |  |  |  |  |  |
| on prior period open sales | 5 |  | 5 | — | — | 5 |
| Gross profit | $314 |  | $297 | $10 | $7 | $314 |
| Copper sales (millions of recoverable pounds) | 374 |  | 374 |  |  |  |
| Molybdenum sales (millions of recoverable pounds)a |  |  |  | 9 |  |  |
| Gross profit per pound of copper/molybdenum: |  |  |  |  |  |  |
| Revenues, excluding adjustments | $2.68 |  | $2.68 | $7.00 |  |  |
| Site production and delivery, before net noncash |  |  |  |  |  |  |
| and other costs shown below | 1.50 |  | 1.42 | 5.16 |  |  |
| By-product credits | (0.15) |  | — | — |  |  |
| Treatment charges | 0.11 |  | 0.11 | — |  |  |
| Unit net cash costs | 1.46 |  | 1.53 | 5.16 |  |  |
| DD&A | 0.31 |  | 0.29 | 0.52 |  |  |
| Noncash and other costs, net | 0.09 | c | 0.09 | 0.07 |  |  |
| Total unit costs | 1.86 |  | 1.91 | 5.75 |  |  |
| Other revenue adjustments, primarily for pricing |  |  |  |  |  |  |
| on prior period open sales | 0.02 |  | 0.02 | — |  |  |
| Gross profit per pound | $0.84 |  | $0.79 | $1.25 |  |  |
| Reconciliation to Amounts Reported |  |  |  |  |  |  |
| (In millions) |  |  | Production |  |  |  |
|  | Revenues |  | and Delivery | DD&A |  |  |
| Totals presented above | $1,084 |  | $584 | $116 |  |  |
| Treatment charges | (9) |  | 33 | — |  |  |
| Noncash and other costs, net | — |  | 33 | — |  |  |
| Other revenue adjustments, primarily for pricing |  |  |  |  |  |  |
| on prior period open sales | 5 |  | — | — |  |  |
| Eliminations and other | 15 |  | 16 | — |  |  |
| North America copper mines | 1,095 |  | 666 | 116 |  |  |
| Other miningd | 3,038 |  | 2,340 | 244 |  |  |
| Corporate, other & eliminations | (792) |  | (818) | 29 |  |  |
| As reported in FCX’s consolidated financial statements | $3,341 |  | $2,188 | $389 |  |  |

a. Reflects sales of molybdenum produced by certain of the North America copper mines to our molybdenum sales company at market-based pricing.

b. Includes gold and silver product revenues and production costs.

c. Includes $19 million ($0.05 per pound of copper) for other asset impairment charges at Morenci.

d. Represents the combined total for our other mining operations, including South America mining, Indonesia mining, Molybdenum mines, Rod & Refining and Atlantic Copper Smelting & Refining, as presented in Note 9.

### South America Mining Product Revenues, Production Costs and Unit Net Cash Costs

*(In millions)*

| Three Months Ended March 31, 2018 |  | By-Product Method | Co-Product Method Copper | Othera | Total |
| --- | ---: | ---: | ---: | ---: | ---: |
| Revenues, excluding adjustments |  | $894 | $894 | $85 | $979 |
| Site production and delivery, before net noncash |  |  |  |  |  |
| and other costs shown below |  | 517 | 476 | 52 | 528 |
| By-product credits |  | (74) | — | — | — |
| Treatment charges |  | 59 | 59 | — | 59 |
| Royalty on metals |  | 2 | 2 | — | 2 |
| Net cash costs |  | 504 | 537 | 52 | 589 |
| DD&A |  | 126 | 115 | 11 | 126 |
| Noncash and other costs, net |  | 15 | 15 | — | 15 |
| Total costs |  | 645 | 667 | 63 | 730 |
| Other revenue adjustments, primarily for pricing |  |  |  |  |  |
| on prior period open sales |  | (43) | (43) | — | (43) |
| Gross profit |  | $206 | $184 | $22 | $206 |
| Copper sales (millions of recoverable pounds) |  | 290 | 290 |  |  |
| Gross profit per pound of copper: |  |  |  |  |  |
| Revenues, excluding adjustments |  | $3.08 | $3.08 |  |  |
| Site production and delivery, before net noncash |  |  |  |  |  |
| and other costs shown below |  | 1.78 | 1.64 |  |  |
| By-product credits |  | (0.25) | — |  |  |
| Treatment charges |  | 0.20 | 0.20 |  |  |
| Royalty on metals |  | 0.01 | 0.01 |  |  |
| Unit net cash costs |  | 1.74 | 1.85 |  |  |
| DD&A |  | 0.43 | 0.40 |  |  |
| Noncash and other costs, net |  | 0.05 | 0.05 |  |  |
| Total unit costs |  | 2.22 | 2.30 |  |  |
| Other revenue adjustments, primarily for pricing |  |  |  |  |  |
| on prior period open sales |  | (0.15) | (0.15) |  |  |
| Gross profit per pound |  | $0.71 | $0.63 |  |  |
| Reconciliation to Amounts Reported |  |  |  |  |  |
| (In millions) |  |  | Production |  |  |
|  |  | Revenues | and Delivery | DD&A |  |
| Totals presented above |  | $979 | $528 | $126 |  |
| Treatment charges |  | (59) | — | — |  |
| Royalty on metals |  | (2) | — | — |  |
| Noncash and other costs, net |  | — | 15 | — |  |
| Other revenue adjustments, primarily for pricing |  |  |  |  |  |
| on prior period open sales |  | (43) | — | — |  |
| Eliminations and other |  | 2 | — | 1 |  |
| South America mining |  | 877 | 543 | 127 |  |
| Other miningb | — | 4,948 | 3,259 | 303 |  |
| Corporate, other & eliminations | — | (957) | (994) | 21 |  |
| As reported in FCX’s consolidated financial statements |  | $4,868 | $2,808 | $451 |  |

a. Includes silver sales of 975 thousand ounces ($16.52 per ounce average realized price). Also reflects sales of molybdenum produced by Cerro Verde to our molybdenum sales company at market-based pricing.

b. Represents the combined total for our other mining operations, including North America copper mines, Indonesia mining, Molybdenum mines, Rod & Refining and Atlantic Copper Smelting & Refining, as presented in Note 9.

### South America Mining Product Revenues, Production Costs and Unit Net Cash Costs

*(In millions)*

| Three Months Ended March 31, 2017 | By-Product Method | Co-Product Method Copper | Othera | Total |
| --- | ---: | ---: | ---: | ---: |
| Revenues, excluding adjustments | $821 | $821 | $68 | $889 |
| Site production and delivery, before net noncash |  |  |  |  |
| and other costs shown below | 457 | 426 | 43 | 469 |
| By-product credits | (56) | — | — | — |
| Treatment charges | 68 | 68 | — | 68 |
| Royalty on metals | 2 | 2 | — | 2 |
| Net cash costs | 471 | 496 | 43 | 539 |
| DD&A | 133 | 123 | 10 | 133 |
| Noncash and other costs, net | 5 | 5 | — | 5 |
| Total costs | 609 | 624 | 53 | 677 |
| Other revenue adjustments, primarily for pricing |  |  |  |  |
| on prior period open sales | 49 | 49 | — | 49 |
| Gross profit | $261 | $246 | $15 | $261 |
| Copper sales (millions of recoverable pounds) | 309 | 309 |  |  |
| Gross profit per pound of copper: |  |  |  |  |
| Revenues, excluding adjustments | $2.66 | $2.66 |  |  |
| Site production and delivery, before net noncash |  |  |  |  |
| and other costs shown below | 1.48 | 1.38 |  |  |
| By-product credits | (0.18) | — |  |  |
| Treatment charges | 0.22 | 0.22 |  |  |
| Royalty on metals | 0.01 | 0.01 |  |  |
| Unit net cash costs | 1.53 | 1.61 |  |  |
| DD&A | 0.43 | 0.40 |  |  |
| Noncash and other costs, net | 0.01 | 0.01 |  |  |
| Total unit costs | 1.97 | 2.02 |  |  |
| Other revenue adjustments, primarily for pricing |  |  |  |  |
| on prior period open sales | 0.16 | 0.16 |  |  |
| Gross profit per pound | $0.85 | $0.80 |  |  |
| Reconciliation to Amounts Reported |  |  |  |  |
| (In millions) |  | Production |  |  |
|  | Revenues | and Delivery | DD&A |  |
| Totals presented above | $889 | $469 | $133 |  |
| Treatment charges | (68) | — | — |  |
| Royalty on metals | (2) | — | — |  |
| Noncash and other costs, net | — | 5 | — |  |
| Other revenue adjustments, primarily for pricing |  |  |  |  |
| on prior period open sales | 49 | — | — |  |
| Eliminations and other | — | (1) | — |  |
| South America mining | 868 | 473 | 133 |  |
| Other miningb | 3,265 | 2,533 | 227 |  |
| Corporate, other & eliminations | (792) | (818) | 29 |  |
| As reported in FCX’s consolidated financial statements | $3,341 | $2,188 | $389 |  |

a. Includes silver sales of 964 thousand ounces ($16.06 per ounce average realized price). Also reflects sales of molybdenum produced by Cerro Verde to our molybdenum sales company at market-based pricing.

b. Represents the combined total for our other mining operations, including North America copper mines, Indonesia mining, Molybdenum mines, Rod & Refining and Atlantic Copper Smelting & Refining, as presented in Note 9.

54

### Indonesia Mining Product Revenues, Production Costs and Unit Net Cash Costs

*(In millions)*

| Three Months Ended March 31, 2018 | By-Product Method | Co-Product Method Copper | Gold | Silvera | Total |
| --- | ---: | ---: | ---: | ---: | ---: |
| Revenues, excluding adjustments | $976 | $976 | $791 | $19 | $1,786 |
| Site production and delivery, before net noncash |  |  |  |  |  |
| and other costs shown below | 433 | 237 | 192 | 4 | 433 |
| Gold and silver credits | (826) | — | — | — | — |
| Treatment charges | 78 | 43 | 34 | 1 | 78 |
| Export duties | 46 | 25 | 21 | — | 46 |
| Royalty on metals | 67 | 36 | 30 | 1 | 67 |
| Net cash (credits) costs | (202) | 341 | 277 | 6 | 624 |
| DD&A | 181 | 99 | 80 | 2 | 181 |
| Noncash and other costs, net | 15 | 8 | 6 | 1 | 15 |
| Total (credits) costs | (6) | 448 | 363 | 9 | 820 |
| Other revenue adjustments, primarily for pricing |  |  |  |  |  |
| on prior period open sales | (38) | (38) | 16 | — | (22) |
| PT Smelting intercompany loss | (9) | (5) | (4) | — | (9) |
| Gross profit | $935 | $485 | $440 | $10 | $935 |
| Copper sales (millions of recoverable pounds) | 319 | 319 |  |  |  |
| Gold sales (thousands of recoverable ounces) |  |  | 603 |  |  |
| Gross profit per pound of copper/per ounce of gold: |  |  |  |  |  |
| Revenues, excluding adjustments | $3.06 | $3.06 | $1,312 |  |  |
| Site production and delivery, before net noncash |  |  |  |  |  |
| and other costs shown below | 1.36 | 0.75 | 319 |  |  |
| Gold and silver credits | (2.59) | — | — |  |  |
| Treatment charges | 0.25 | 0.13 | 57 |  |  |
| Export duties | 0.14 | 0.08 | 34 |  |  |
| Royalty on metals | 0.21 | 0.11 | 49 |  |  |
| Unit net cash (credits) costs | (0.63) | 1.07 | 459 |  |  |
| DD&A | 0.57 | 0.31 | 133 |  |  |
| Noncash and other costs, net | 0.04 | 0.02 | 11 |  |  |
| Total unit (credits) costs | (0.02) | 1.40 | 603 |  |  |
| Other revenue adjustments, primarily for pricing |  |  |  |  |  |
| on prior period open sales | (0.12) | (0.12) | 27 |  |  |
| PT Smelting intercompany loss | (0.03) | (0.02) | (7) |  |  |
| Gross profit per pound/ounce | $2.93 | $1.52 | $729 |  |  |
| Reconciliation to Amounts Reported |  |  |  |  |  |
| (In millions) |  | Production |  |  |  |
|  | Revenues | and Delivery | DD&A |  |  |
| Totals presented above | $1,786 | $433 | $181 |  |  |
| Treatment charges | (78) | — | — |  |  |
| Export duties | (46) | — | — |  |  |
| Royalty on metals | (67) | — | — |  |  |
| Noncash and other costs, net | — | 15 | — |  |  |
| Other revenue adjustments, primarily for pricing |  |  |  |  |  |
| on prior period open sales | (22) | — | — |  |  |
| PT Smelting intercompany loss | — | 9 | — |  |  |
| Indonesia mining | 1,573 | 457 | 181 |  |  |
| Other miningb | 4,252 | 3,345 | 249 |  |  |
| Corporate, other & eliminations | (957) | (994) | 21 |  |  |
| As reported in FCX’s consolidated financial statements | $4,868 | $2,808 | $451 |  |  |

a. Includes silver sales of 1.2 million ounces ($15.76 per ounce average realized price).

b. Represents the combined total for our other mining operations, including North America copper mines, South America mining, Molybdenum mines, Rod & Refining and Atlantic Copper Smelting & Refining, as presented in Note 9.

55

### Indonesia Mining Product Revenues, Production Costs and Unit Net Cash Costs

*(In millions)*

| Three Months Ended March 31, 2017 | By-Product Method |  | Co-Product Method Copper | Gold | Silvera | Total |
| --- | ---: | --- | ---: | ---: | ---: | ---: |
| Revenues, excluding adjustments | $327 |  | $327 | $218 | $7 | $552 |
| Site production and delivery, before net noncash |  |  |  |  |  |  |
| and other costs shown below | 265 |  | 157 | 104 | 4 | 265 |
| Gold and silver credits | (234) |  | — | — | — | — |
| Treatment charges | 35 |  | 21 | 14 | — | 35 |
| Export duties | 14 |  | 8 | 6 | — | 14 |
| Royalty on metals | 19 |  | 11 | 8 | — | 19 |
| Net cash costs | 99 |  | 197 | 132 | 4 | 333 |
| DD&A | 83 |  | 49 | 33 | 1 | 83 |
| Noncash and other costs, net | 32 | b | 19 | 13 | — | 32 |
| Total costs | 214 |  | 265 | 178 | 5 | 448 |
| Other revenue adjustments, primarily for pricing |  |  |  |  |  |  |
| on prior period open sales | 41 |  | 41 | 9 | — | 50 |
| PT Smelting intercompany profit | 27 |  | 16 | 11 | — | 27 |
| Gross profit | $181 |  | $119 | $60 | $2 | $181 |
| Copper sales (millions of recoverable pounds) | 125 |  | 125 |  |  |  |
| Gold sales (thousands of recoverable ounces) |  |  |  | 177 |  |  |
| Gross profit per pound of copper/per ounce of gold: |  |  |  |  |  |  |
| Revenues, excluding adjustments | $2.63 |  | $2.63 | $1,229 |  |  |
| Site production and delivery, before net noncash |  |  |  |  |  |  |
| and other costs shown below | 2.13 |  | 1.26 | 589 |  |  |
| Gold and silver credits | (1.88) |  | — | — |  |  |
| Treatment charges | 0.28 |  | 0.17 | 77 |  |  |
| Export duties | 0.11 |  | 0.07 | 31 |  |  |
| Royalty on metals | 0.16 |  | 0.09 | 45 |  |  |
| Unit net cash costs | 0.80 |  | 1.59 | 742 |  |  |
| DD&A | 0.66 |  | 0.39 | 184 |  |  |
| Noncash and other costs, net | 0.26 | b | 0.15 | 72 |  |  |
| Total unit costs | 1.72 |  | 2.13 | 998 |  |  |
| Other revenue adjustments, primarily for pricing |  |  |  |  |  |  |
| on prior period open sales | 0.33 |  | 0.33 | 51 |  |  |
| PT Smelting intercompany profit | 0.21 |  | 0.13 | 59 |  |  |
| Gross profit per pound/ounce | $1.45 |  | $0.96 | $341 |  |  |
| Reconciliation to Amounts Reported |  |  |  |  |  |  |
| (In millions) |  |  | Production |  |  |  |
|  | Revenues |  | and Delivery | DD&A |  |  |
| Totals presented above | $552 |  | $265 | $83 |  |  |
| Treatment charges | (35) |  | — | — |  |  |
| Export duties | (14) |  | — | — |  |  |
| Royalty on metals | (19) |  | — | — |  |  |
| Noncash and other costs, net | — |  | 32 | — |  |  |
| Other revenue adjustments, primarily for pricing |  |  |  |  |  |  |
| on prior period open sales | 50 |  | — | — |  |  |
| PT Smelting intercompany profit | — |  | (27) | — |  |  |
| Indonesia mining | 534 |  | 270 | 83 |  |  |
| Other miningc | 3,599 |  | 2,736 | 277 |  |  |
| Corporate, other & eliminations | (792) |  | (818) | 29 |  |  |
| As reported in FCX’s consolidated financial statements | $3,341 |  | $2,188 | $389 |  |  |

a. Includes silver sales of 404 thousand ounces ($17.37 per ounce average realized price).

b. Includes $21 million ($0.17 per pound of copper) of costs charged directly to cost of sales as a result of the impact of regulatory restrictions on PT-FI's concentrate exports.

c. Represents the combined total for our other mining operations, including North America copper mines, South America mining, Molybdenum mines, Rod & Refining and Atlantic Copper Smelting & Refining, as presented in Note 9.

56

### Molybdenum Mines Product Revenues, Production Costs and Unit Net Cash Costs

*(In millions)*

|  | Three Months Ended March 31, 2018 | 2017 |  |
| --- | ---: | ---: | ---: |
| Revenues, excluding adjustmentsa | $102 | $70 |  |
| Site production and delivery, before net noncash and other costs shown below | 65 | 51 |  |
| Treatment charges and other | 7 | 7 |  |
| Net cash costs | 72 | 58 |  |
| DD&A | 19 | 19 |  |
| Noncash and other costs, net | 2 | 1 |  |
| Total costs | 93 | 78 |  |
| Gross profit (loss) | $9 | $(8) |  |
| Molybdenum sales (millions of recoverable pounds)a | 9 | 8 |  |
| Gross profit (loss) per pound of molybdenum: |  |  |  |
| Revenues, excluding adjustmentsa | $11.99 | $8.57 |  |
| Site production and delivery, before net noncash and other costs shown below | 7.71 | 6.17 |  |
| Treatment charges and other | 0.86 | 0.85 |  |
| Unit net cash costs | 8.57 | 7.02 |  |
| DD&A | 2.24 | 2.37 |  |
| Noncash and other costs, net | 0.15 | 0.15 |  |
| Total unit costs | 10.96 | 9.54 |  |
| Gross profit (loss) per pound | $1.03 | $(0.97) |  |
| Reconciliation to Amounts Reported |  |  |  |
| (In millions) |  |  |  |
|  |  | Production |  |
| Three Months Ended March 31, 2018 | Revenues | and Delivery | DD&A |
| Totals presented above | $102 | $65 | $19 |
| Treatment charges and other | (7) | — | — |
| Noncash and other costs, net | — | 2 | — |
| Molybdenum mines | 95 | 67 | 19 |
| Other miningb | 5,730 | 3,735 | 411 |
| Corporate, other & eliminations | (957) | (994) | 21 |
| As reported in FCX’s consolidated financial statements | $4,868 | $2,808 | $451 |
| Three Months Ended March 31, 2017 |  |  |  |
| Totals presented above | $70 | $51 | $19 |
| Treatment charges and other | (7) | — | — |
| Noncash and other costs, net | — | 1 | — |
| Molybdenum mines | 63 | 52 | 19 |
| Other miningb | 4,070 | 2,954 | 341 |
| Corporate, other & eliminations | (792) | (818) | 29 |
| As reported in FCX’s consolidated financial statements | $3,341 | $2,188 | $389 |

a. Reflects sales of the Molybdenum mines’ production to our molybdenum sales company at market-based pricing. On a consolidated basis, realizations are based on the actual contract terms for sales to third parties; as a result, our consolidated average realized price per pound of molybdenum will differ from the amounts reported in this table.

b. Represents the combined total for our other mining operations, including North America copper mines, South America mining, Indonesia mining, Rod & Refining and Atlantic Copper Smelting & Refining, as presented in Note 9. Also includes amounts associated with our molybdenum sales company, which includes sales of molybdenum produced by the Molybdenum mines and by certain of the North America and South America copper mines.

57

### CAUTIONARY STATEMENT

Our discussion and analysis contains forward-looking statements in which we discuss our potential future performance. Forward-looking statements are all statements other than statements of historical facts, such as projections or expectations relating to ore grades and milling rates, production and sales volumes, unit net cash costs, operating cash flows, capital expenditures, exploration efforts and results, development and production activities and costs, liquidity, tax rates, the impact of copper, gold and molybdenum price changes, the impact of deferred intercompany profits on earnings, reserve estimates, future dividend payments, and share purchases and sales. The words “anticipates,” “may,” “can,” “plans,” “believes,” “estimates,” “expects,” “projects,” “targets,” “intends,” “likely,” “will,” “should,” “to be,” “potential” and any similar expressions are intended to identify those assertions as forward-looking statements. The declaration of dividends is at the discretion of the Board and will depend on our financial results, cash requirements, future prospects, and other factors deemed relevant by the Board.

We caution readers that forward-looking statements are not guarantees of future performance and actual results may differ materially from those anticipated, projected or assumed in the forward-looking statements. Important factors that can cause our actual results to differ materially from those anticipated in the forward-looking statements include supply of and demand for, and prices of, copper, gold and molybdenum; mine sequencing; production rates; potential inventory adjustments; potential impairment of long-lived mining assets; the outcome of negotiations with the Indonesian government regarding PT-FI’s long-term mining rights; the potential effects of violence in Indonesia generally and in the province of Papua; industry risks; regulatory changes; political risks; labor relations; weather- and climate-related risks; environmental risks (including resolution of the administrative sanctions and other environmental matters pending before Indonesia's Ministry of Environment and Forestry); litigation results (including the final disposition of Indonesian tax disputes and the outcome of Cerro Verde’s royalty dispute with the Peruvian national tax authority); and other factors described in more detail in Part I, Item 1A. “Risk Factors” of our annual report on Form 10-K for the year ended December 31, 2017, filed with the SEC. With respect to our operations in Indonesia, such factors include whether PT-FI will be able to resolve complex regulatory matters in Indonesia by June 30, 2018, or obtain an extension of its temporary IUPK after June 30, 2018.

Investors are cautioned that many of the assumptions upon which our forward-looking statements are based are likely to change after the forward-looking statements are made, including for example commodity prices, which we cannot control, and production volumes and costs, some aspects of which we may not be able to control. Further, we may make changes to our business plans that could affect our results. We caution investors that we do not intend to update forward-looking statements more frequently than quarterly notwithstanding any changes in our assumptions, changes in business plans, actual experience or other changes, and we undertake no obligation to update any forward-looking statements.

## Market risk

As filed, 740 characters.

There have been no material changes in our market risks during the three-month period ended March 31, 2018. For additional information on market risks, refer to “Disclosures About Market Risks” included in Part II, Items 7. and 7A. of our annual report on Form 10-K for the year ended December 31, 2017. For projected sensitivities of our operating cash flow to changes in commodity prices, refer to “Outlook” in Part I, Item 2. of this quarterly report on Form 10-Q for the period ended March 31, 2018; for projected sensitivities of our provisionally priced copper sales to changes in commodity prices refer to “Consolidated Results – Revenues” in Part I, Item 2. of this quarterly report on Form 10-Q for the period ended March 31, 2018.

## Controls and procedures

As filed, 826 characters.

(a) Evaluation of disclosure controls and procedures. Our chief executive officer and chief financial officer, with the participation of management, have evaluated the effectiveness of our “disclosure controls and procedures” (as defined in Rules 13a-15(e) and 15d-15(e) under the Securities Exchange Act of 1934) as of the end of the period covered by this quarterly report on Form 10-Q. Based on their evaluation, they have concluded that our disclosure controls and procedures are effective as of March 31, 2018.

(b) Changes in internal control over financial reporting. There has been no change in our internal control over financial reporting that occurred during the quarter ended March 31, 2018, that has materially affected, or is reasonably likely to materially affect, our internal control over financial reporting.

## Risk factors

As filed, 183 characters.

There have been no material changes to our risk factors previously disclosed in Part I, Item 1A. “Risk Factors” of our annual report on Form 10-K for the year ended December 31, 2017.

Filed May 4, 2018.
Source: SEC EDGAR, the filing index for accession 0000831259-18-000016. Last ingested by Listed: Nov 6, 2026, 13:42 ET. No prices; not investment advice.