# Sterling Infrastructure, Inc.: Form 10-Q for the period ended Mar 31, 2011

- Company: [Sterling Infrastructure, Inc.](/companies/strl.md) (CIK 874238)
- Form: 10-Q
- Filed: 2011-05-10
- Accepted by EDGAR: May 9, 2011, 18:25 ET
- Period: 2011-03-31
- Accession: 0000874238-11-000012
- Inline XBRL: no
- Main document: https://www.sec.gov/Archives/edgar/data/874238/000087423811000012/form10q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/874238/000087423811000012/

## Management's discussion and analysis

As filed, 34,932 characters.

### Forward Looking Statements

This Report includes statements that are, or may be considered to be, "forward-looking statements" within the meaning of Section 27A of the Securities Act of 1933, as amended, or the Securities Act and Section 21E of the Securities Exchange Act of 1934, as amended, or the Exchange Act. These forward-looking statements are included throughout this Report, including this "Management's Discussion and Analysis of Financial Condition and Results of Operations" and relate to matters such as our industry, business strategy, goals and expectations concerning our market position, future operations, margins, profitability, capital expenditures, liquidity and capital resources and other financial and operating information. We have used the words "anticipate," "assume," "believe," "budget," "continue," "could," "estimate," "expect," "forecast," "future," "intend," "may," "plan," "potential," "predict," "project," "should," "will," "would" and similar terms and phrases to identify forward-looking statements in this Report.

Forward-looking statements reflect our current expectations as of the date of this report regarding future events, results or outcomes. These expectations may or may not be realized. Some of these expectations may be based upon assumptions or judgments that prove to be incorrect. In addition, our business and operations involve numerous risks and uncertainties, many of which are beyond our control, that could result in our expectations not being realized or otherwise could materially affect our financial condition, results of operations and cash flows.

Actual events, results and outcomes may differ materially from our expectations due to a variety of factors. Although it is not possible to identify all of these factors, they include, among others, the following:

- changes in general economic conditions, including the current recession/economic conundrum, reductions in federal, state and local government funding for infrastructure services and changes in those governments’ budgets, practices, laws and regulations;
- delays or difficulties related to the completion of our projects, including additional costs, reductions in revenues or the payment of liquidated damages, or delays or difficulties related to obtaining required governmental permits and approvals;
- actions of suppliers, subcontractors, design engineers, joint venture partners, customers, competitors, banks, surety companies and others which are beyond our control, including suppliers’, subcontractors and joint venture partners’ failure to perform;
- the effects of estimates inherent in our percentage-of-completion accounting policies, including onsite conditions that differ materially from those assumed in our original bid, contract modifications, mechanical problems with our machinery or equipment and effects of other risks discussed in this document;
- cost escalations associated with our contracts, including changes in availability, proximity and cost of materials such as steel, cement, concrete, aggregates, oil, fuel and other construction materials, and cost escalations associated with subcontractors and labor;
- our dependence on a few significant customers;
- adverse weather conditions; although we prepare our budgets and bid contracts based on historical rain and snowfall patterns, the incidence of rain, snow, hurricanes, etc., may differ materially from these expectations;
- the presence of competitors with greater financial resources or lower margin requirements than us, and the impact of competitive bidders on our ability to obtain new backlog at reasonable margins acceptable to us;
- our ability to successfully identify, finance, complete and integrate acquisitions;
- citations issued by any governmental authority, including the Occupational Safety and Health Administration;
- federal, state and local environmental laws and regulations, the noncompliance of which can result in penalties and /or termination of contracts as well as civil and criminal liability;
- the current instability of financial institutions, which could cause losses on our cash and cash equivalents and short-term investments; and
- adverse economic conditions in our markets in Texas, Utah and Nevada.

Stockholders and potential investors are urged to carefully consider these factors and the other factors described under “Risk Factors” in Item 1A of the 2010 Form 10-K for the year ended December 31, 2010 in evaluating any forward-looking statements and are cautioned not to place undue reliance on these forward-looking statements. Although we believe that our plans, intentions and expectations reflected in or suggested by the forward-looking statements that we make in this report are reasonable, we can provide no assurance that such plans, intentions or expectations will be achieved.

The forward-looking statements included in this Report are made only as of the date of this Report, and we undertake no obligation to update any information contained in this Report or to publicly release the results of any revisions to any forward-looking statements to reflect events or circumstances that occur, or that we become aware of after the date of this Report, except as may be required by applicable securities laws.

### Overview

We are a company that operates in one segment, heavy civil construction, through our subsidiaries, which specialize in the building, reconstruction and repair of transportation and water infrastructure primarily in large and growing markets in Texas, Utah, Nevada and other states in which we see opportunities. Transportation infrastructure projects include highways, roads, bridges and light and commuter rail. Water infrastructure projects include water, wastewater and storm drainage systems. Sterling provides general contracting services, including excavating, concrete and asphalt paving, installation of large-diameter water and wastewater distribution systems, construction of bridges and similar large structures, construction of light and commuter rail infrastructure, concrete and asphalt batch plant operations, concrete crushing and aggregate operations primarily to public sector clients. We perform the majority of the work required by our contracts with our own crews and equipment.

Our business was founded in 1955 and has a history of profitable growth, which we have achieved by expanding both our service profile and our market areas. This has involved adding services, such as concrete operations, in order to capture a greater percentage of available work in current and potential markets. It also involved strategically expanding operations, either by establishing an office in a new market, often after having successfully bid on and completed a project in that market, or by acquiring a company that gives us an immediate entry into a market.

For a more detailed discussion of the Company's business, readers of this report are advised to review Item 1, Business, of the 2010 Form 10-K for the year ended December 31, 2010.

### Our Markets

Demand for transportation and water infrastructure depends on a variety of factors, including overall population growth, economic expansion and the vitality of the market areas in which we operate, as well as unique local topographical, structural and environmental issues. In addition to these factors, demand for the replacement of infrastructure is driven by the general aging of infrastructure and the need for technical improvements to achieve more efficient or safer use of infrastructure and resources. Funding for this infrastructure depends on federal, state and local governmental resources, budgets and authorizations. Each of these factors is discussed more fully in “Item 1. Business−Our Markets” in the 2010 Form 10-K.

According to 2010 U.S. Census Bureau information, Texas, Utah and Nevada each experienced significant population growth from 2005 to 2010 and are expected to continue to experience population increases from 25.1 million, 2.8 million and 2.7 million people in 2010, respectively, to populations of over 33 million, 3 million and 4 million, respectively, by 2030.

In 2007, the voters of the State of Texas approved $5.0 billion in bonds for highway construction to be repaid out of the State's general funds; the State's budget for the biennium 2010-2011 for highways and bridges includes $1.9 billion of proceeds from these bonds (“Prop 12 Bonds”).

The estimated Texas Department of Transportation (“TXDOT”) lettings (contract awards) for transportation construction projects are $4.8 billion for the state’s fiscal year ending August 31, 2011, including stimulus funds and a portion of the Prop 12 Bonds discussed above versus approximately $4.2 billion of lettings in 2010 including stimulus funds and a portion of the Prop 12 Bonds. Due to the uncertainty regarding federal funding and expected constraints of the Texas budget, TXDOT is forecasting lettings of only $2.7 billion for 2012 before any appropriations from the Prop 12 Bonds discussed above. TXDOT was instructed by the last session of the Texas legislature to move forward on projects with the expectation that additional Prop 12 Bonds would be enabled, which would increase the forecasted lettings for 2012. In April 2011, the Texas State Senate approved the use of the remaining $3.0 billion of the Prop 12 Bonds for highway and bridge construction, rehabilitation and maintenance in the 2012-2013 budget. Such use still requires the approval of the Texas House of Representatives and the Governor.

Utah’s Long Range Transportation Plan for 2007-2030 projects spending for highway and bridge construction of $18.9 billion during that period of time. The Utah Governor’s budget recommends $750 million for transportation capital projects in 2012 versus authorization of $1.2 billion for 2011. Information we have received indicates that there will be a substantial reduction of highway and bridge construction projects in 2013 versus 2012.

Based on press statements by officials of the Nevada Department of Transportation (“NDOT”), and the Nevada legislative website, we estimate NDOT expenditures in 2010 and 2011 will be between $300 million and $400 million in each of those fiscal years, including economic stimulus funds for highways and bridges.

Our water and wastewater, underground utility, light and commuter rail and non-highway paving work is generally funded by municipalities and other local authorities. The size and growth rates of these markets are difficult to determine as a whole, given the number of municipalities, the differences in funding sources and variations in local budget. Two of the many municipalities that we perform work for are discussed below.

The City of Houston’s Capital Improvement Plan includes $665 million and $639 million in the fiscal years ending June 30, 2011 and 2012, respectively, for transportation and water infrastructure projects.

The City of San Antonio adopted a six-year capital improvement plan for its fiscal years 2011 through 2016, which includes $322.5 million for streets and $165.6 million for drainage. The expenditures will be partially funded by the $550 million bond program that the voters of the City of San Antonio approved in May 2007. San Antonio’s budget for such projects is $313 million and $156 million for its fiscal years 2011 and 2012, respectively.

We also do work for the U. S. government, other states and cities, counties and tollroad, business area redevelopment and regional water authorities, which have substantial water and transportation infrastructure spending budgets.

During the last quarter of 2008 and through March 31, 2011, the bidding environment in our markets has been much more competitive because of the following:

- While our business includes only minimal residential and commercial infrastructure work, the severe fall-off in new projects in those markets has resulted in some residential and commercial infrastructure contractors bidding on smaller public sector transportation and water infrastructure projects, sometimes at bid levels below our break-even pricing, thus increasing competition and creating downward pressure on bid prices in our markets.
- Traditional competitors on larger transportation and water infrastructure projects also appear to have been bidding at less than normal margins, sometimes at bid levels below our break-even pricing, in order to replenish their reduced backlogs.
- The entrance of new competitors from other states.

These factors have limited our ability to increase our backlog through successful bids for new projects and have compressed the profitability on the new projects where we submitted successful bids. While we have been more aggressive in reducing the anticipated margins we use to bid on some projects, we have not bid at anticipated loss margins in order to obtain new backlog.

Recent reductions in miles driven in the U.S. and more fuel efficient vehicles have reduced federal and state gasoline taxes and tolls collected. In addition, the federal government has not renewed the five-year SAFETEA-LU bill, which provided states with substantial funding for transportation infrastructure projects. Since the SAFETEA-LU bill expired on September 30, 2009, the federal government has been extending financial assistance to the states on an interim basis, most recently through September 30, 2011. Continued deferral of new funding legislation or reductions in federal funding may negatively impact the states’ highway and bridge construction contract awards for their fiscal years 2011, 2012 and beyond. We had anticipated these matters would be resolved by now; however, they have not yet been resolved and we are unable to predict when or on what terms the federal government might renew the SAFETEA-LU bill or enact other similar legislation.

Further, the nationwide decline in home sales, the increase in foreclosures and a prolonged recession have resulted in decreases in property taxes and some other local taxes, which are among the sources of funding for municipal road, bridge and water infrastructure construction. Expenditures by municipalities may also be limited due to federal, state and local funding limitations in the current economic environment.

These and other factors have adversely affected the levels of transportation and water infrastructure capital awards and expenditures in our markets, reducing bidding opportunities to replace backlog and increasing competition for new projects. Assuming that these factors continue to affect infrastructure capital expenditures in our markets in the near term, and taking into account the lower anticipated margins bid on some projects the Company has recently been awarded and has started or expects to start work on in 2011, we currently anticipate that the Company’s net income and diluted earnings per share of common stock attributable to Sterling common stockholders for 2011 will be significantly less than the results we achieved for 2010.

We do, however, expect that our markets will ultimately recover from the conditions described above and that our backlog and revenues will grow and gross margins, net income and earnings per share will return to levels more consistent with historical rates of return. However, we cannot predict the timing of such a return to historical normalcy in our markets. We believe that the Company is in sound financial condition and has the resources and management experience to weather current market conditions and to continue to compete successfully for projects as they become available at acceptable profit margin levels. See “Business−Markets and Customers−Our Markets” in the 2010 Form 10-K for a more detailed discussion of our markets and their funding sources.

### Results of Operations

#### Backlog at March 31, 2011

Backlog is our estimate of the revenues that we expect to earn in future periods on our construction projects which are typically completed in 12 to 36 months. At March 31, 2011, our backlog was $740 million as compared to $660 million as of December 31, 2010 and $618 million at March 31, 2010. Our backlog at March 31, 2011 included approximately $223 million of expected revenues for which the contracts had not yet been officially awarded, including two projects totaling $184 million on which the customers have deferred executing and starting the contract pending the sale of bonds or the resolution of other funding issues; we expect these issues to be resolved by the end of June 2011. Historically, subsequent non-awards of contracts or finalization of contract price have not materially affected our backlog, results of operations or financial condition. Backlog at March 31, 2011, includes $38 million applicable to consolidated joint ventures where we have a controlling interest, which is the entire amount of such joint ventures’ backlog, and $184 million where we have a noncontrolling interest, which represents our proportionate share of such joint ventures’ backlog. We were awarded or apparent low bidder on contracts of $179 million during the first quarter of 2011 versus $57 million in the first quarter of 2010. Most of the increase in backlog has been in our Texas market. The increase in backlog is in addition to $473 million of new awards during the last nine months of 2010.

Substantially all of the contracts in our backlog may be canceled at the election of the customer; however, we have not been materially adversely affected by contract cancellations or modifications in the past.

#### Three Months Ended March 31, 2011 Compared with Three Months Ended March 31, 2010

*(Dollar amounts in thousands)*

|  | Three Months Ended March 31, 2011 | 2010 | % Change |
| --- | ---: | ---: | ---: |
| Revenues | $$$ 99,242 | $$$ 86,157 | 15.2 |
| Gross profit | $$$ 7,599 | $$$ 8,249 | (7.9) |
| General and administrative expenses, net | (6,056) | (5,464) | 10.8 |
| Other income (loss) | 145 | 31 |  |
| Operating income | 1,688 | 2,816 | (40.1) |
| Gains (loss) on the sale of short-term investments | (204) | 417 |  |
| Interest income | 378 | 202 |  |
| Interest expense | (214) | (297) |  |
| Income before taxes | 1,648 | 3,138 | (47.5) |
| Income tax expense | (166) | (858) | (80.7) |
| Net income | 1,482 | 2,280 | (35.0) |
| Noncontrolling owners’ interests in earnings of subsidiaries and joint ventures | (1,438) | (728) | 97.5 |
| Net income attributable to Sterling common stockholders | $$$ 44 | $$$ 1,552 | (97.2) |
| Gross margin | 7.7% | 9.6% | (19.8) |
| Operating margin | 1.7% | 3.3% | (48.5) |
|  | **Amount as of** |  |  |
|  | March 31, 2011 | December 31, 2011 |  |
| Contract backlog, end of period | $740,000 | $660,000 |  |

#### Revenues

Revenues increased $13.1 million or 15.2% for the three months ended March 31, 2011 as compared to the three months ended March 31, 2010. This increase was primarily due to execution on contracts awarded in our Texas markets in 2010 and increased revenues resulting from a higher level of activity on joint ventures in which we participate in our Utah market. However, the increase in revenues in Texas was less than expected due to severe adverse weather conditions in certain Texas markets during the first quarter of 2011.

#### Gross Profit

At March 31, 2011, we had approximately 60 contracts-in-progress which were less than 90% complete of various sizes, of different expected profitability and in various stages of completion. The nearer a contract progresses toward completion, the more visibility we have in refining our estimate of total revenues (including incentives, delay penalties and change orders), costs and gross profit. Thus gross profit as a percent of revenues can increase or decrease from comparable and sequential quarters due to variations among contracts and depending upon which contracts are just commencing or are at a more advanced stage of completion.

Despite higher revenues, gross profit was $0.7 million lower during the three months ended March 31, 2011 versus gross profit for the three months ended March 31, 2010 due to lower gross margins resulting from on-going competitive bidding pressures since 2008; to under absorption of indirect costs, primarily as a result of severe weather conditions in our Texas markets; and because of increases in crude oil prices from those anticipated at December 31, 2010, which resulted in higher fuel costs than the amounts we used in our estimates of costs to complete contracts-in-progress at that date. These decreases were partially offset by the gross profit earned on the increase in revenues. The gross margin of 7.7% during the first three months of 2011 decreased from 9.6% in the comparable 2010 quarter for the same reasons as the absolute gross profit amount decreased.

#### Operating Profit

Operating income decreased by $1.1 million during the first quarter of 2011 versus operating income in the first quarter of 2010 because of the decrease in gross profit discussed above and an increase in general and administrative expenses (“G&A”) of $0.6 million over the first quarter of 2010. The primary reasons for the higher G&A during the 2011 period versus the comparable 2010 period were an increase in salaries, wages and related benefits, board of director fees and expenses related to strategic, succession and compensation planning and expenses related to education and training of our employees.

As a percentage of revenues, G&A was 6.1% and 6.3% for the three months ended March 31, 2011 and 2010, respectively. General and administrative expenses do not vary directly with the volume of work performed on contracts.

#### Gain (Loss) on Sale of Securities

In the first quarter of 2011, we had a loss on the sale of short-term investments of $0.2 million versus a gain of $0.4 million in the comparable period of 2010. During the first quarter of 2011 we sold our position in the certain ETF securities, the assets of which were a crude oil commodity pool. The gain in 2010 was primarily a gain on the sale of such securities.

#### Income Taxes

Our effective income tax rates for the first three months of 2011 and 2010 were 10.1% and 27.3%, respectively, and varied from the statutory rate primarily as a result of net income attributable to the noncontrolling interest owners which is taxed to those owners rather than Sterling and, in 2011, non-taxable interest income. Partially offsetting these reductions in the effective tax rate was the impact of state income tax expense.

#### Net Income Attributable to Noncontrolling Interests

The net income attributable to noncontrolling owners’ interests in earnings of subsidiaries and joint ventures increased because of an increase in earnings from those entities.

### Historical Cash Flows

The following table sets forth information about our cash flows and liquidity (in thousands):

| Net cash provided by (used in): | Three Months Ended March 31, 2011 | 2010 |
| --- | ---: | ---: |
| Operating activities | $5,446 | $14,702 |
| Capital expenditures | (8,433) | (1,647) |
| Net purchases of short-term securities | (30,152) | (8,807) |
| Other investing activities | 182 | 31 |
| Financing activities | (4,114) | (11,818) |
|  | **Amount as of** |  |
|  | **March 31, 2011** | **December 31, 2010** |
| Cash and cash equivalents | $12,370 | $49,441 |
| Working capital | $103,104 | $107,278 |

#### Operating Activities

Significant non-cash items for the three month periods included in operating activities are:

- depreciation and amortization, which totaled $4.2 million in the 2011 period, an increase of $0.2 million from 2010 primarily as a result of equipment additions;
- deferred tax expense was $1.3 million in the 2011 period, mainly attributable to amortization for tax return purposes of goodwill and accelerated tax depreciation versus deferred tax expense of $0.3 million in 2010. The increase in deferred tax expense between the periods is due to the difference between accelerated tax depreciation over book depreciation in 2011 versus 2010, primarily due to recent tax law changes which allow the expensing for tax return purposes in 2011 of new equipment additions.

Besides net income of $1.5 million for the three months ended March 31, 2011 and the non-cash items discussed above, other significant components of cash flows from operations were:

- contracts receivable decreased in the first quarter of 2011 by $5.4 million primarily because of the collection of retainage and accounts receivable on projects that were in the final stages of completion at December 31, 2010;
- costs and estimated earnings in excess of billings on uncompleted projects increased by $4.7 million because of a higher level of activity in March 2011 as compared to December 2010, which included the holiday season;
- contracts receivable and cost and earnings in excess of billings decreased by $0.8 million in the current period because of higher collections of retention and of receivables for projects that were substantially complete at December 31, 2010;
- income tax receivable increased $2.9 million in the first quarter of 2011 and is composed of an estimated tax deposit made in 2011 and the benefit of the loss for tax purposes in the first quarter of 2011 resulting primarily from the timing differences related to the items discussed above under deferred tax expense;
- accounts payable decreased by $2.1 million in the current period primarily due to the timing of the receipt of vendor invoices for job costs for which the such invoices had not been received and which costs were included in other accrued expenses;
- other accrued expenses increased by $1.9 million in the first three months of 2011 primarily for the reason discussed above under accounts payable.

#### Investing Activities

During the three months ended March 31, 2011 and 2010, the Company had net purchases of short-term securities of $30.2 million and $8.8 million, respectively. Cash held at the beginning of the period as well as cash generated by operations was invested in short-term securities resulting in the $30.2 million increase in short-term investments during the three months ended March 31, 2011.

Expenditures for the purchase of certain equipment and to expand office and shop facilities totaled $8.4 million in the first three months of 2011 versus $1.6 million in the first three months of 2010. The increase in 2011 is consistent with management’s expectations that capital expenditures in 2011 will be higher than 2010 as a result of normal replacement of equipment, which replacement was deferred in 2009 and 2010; additional equipment required by a Utah joint venture project and a recent low bid on a large job in Texas; and shop and office facilities to be acquired by two of our offices in Texas.

#### Financing Activities

Cash used in financing activities of $4.1 million in the first three months of 2011 primarily relates to distributions to noncontrolling interest owners while cash used in financing activities of $11.8 million in the first three months of 2010 primarily reflects a reduction of $10.0 million in borrowings under our $75.0 million Credit Facility.

### Liquidity and Sources of Capital

The level of working capital for our business varies due to fluctuations in:

- customer receivables and contract retentions;
- costs and estimated earnings in excess of billings;
- billings in excess of costs and estimated earnings;
- the size and status of contract mobilization payments and progress billings; and
- the amounts owed to suppliers and subcontractors.

Some of these fluctuations can be significant.

As of March 31, 2011, we had working capital of $103.1 million, a decrease of $4.2 million from December 31, 2010. The decrease in working capital in the three months ended March 31, 2011 was the result of the following (in thousands):

|  |  |
| --- | ---: |
| Net income | $1,482 |
| Depreciation and amortization | 4,211 |
| Deferred tax expense | 1,268 |
| Capital expenditures | (8,433) |
| Dividends paid to noncontrolling interests owners | (3,900) |
| Other | 1,198 |
| Total decrease in working capital | $(4,174) |

In addition to our available cash and cash equivalents, short term investments and cash provided by operations, we use borrowings under our Credit Facility with Comerica Bank to finance our capital expenditures and working capital needs.

We have a $75.0 million Credit Facility with a bank syndicate for which Comerica Bank is a participant and agent. The Credit Facility has a maturity date of October 31, 2012, and is secured by all assets of the Company, other than proceeds and other rights under our construction contracts which are pledged to our bond surety. Borrowings under the Credit Facility are used to finance working capital. At March 31, 2011, there were no borrowings outstanding under the Credit Facility; however, there were outstanding letters of credit of $1.8 million outstanding under the Credit Facility resulting in availability under the Credit Facility of $73.2 million at March 31, 2011. To date we have not experienced any difficulty in borrowing under our Credit Facility or any material change in its terms, and the Company was in compliance with all covenants under the Credit Facility as of March 31, 2011.

As is customary in the construction business, we are required to provide surety bonds to secure our performance under construction contracts. Our ability to obtain surety bonds primarily depends upon our capitalization, working capital, past performance, management expertise and reputation and certain external factors, including the overall capacity of the surety market. Surety companies consider such factors in relationship to the amount of our backlog and their underwriting standards, which may change from time to time. We have pledged all proceeds and other rights under our construction contracts to our bond surety company. Events that affect the insurance and bonding markets may result in bonding becoming more difficult to obtain in the future, or being available only at a significantly greater cost. To date, we have not encountered difficulties or material cost increases in obtaining new surety bonds.

The Company believes that it has sufficient liquid financial resources, including the $73.2 million unused portion of its Credit Facility at March 31, 2011, to fund its requirements for the next twelve months of operations, including its bonding requirements, and the Company expects no material adverse change in its liquidity. Future developments or events, such as an increase in our level of purchases of equipment to support significantly higher backlog or an acquisition of another company could, however, affect our level of working capital and tangible net worth. See “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operation−Sources of Capital” in the 2010 Form 10-K for further discussion of the covenants and restrictions under the Credit Facility.

### Inflation

Until 2008, inflation had not had a material impact on our financial results; however, that year's increases in oil and fuel prices affected our cost of operations. While the prices we have paid for oil and fuel and, generally, for other materials have decreased since 2008, we have over the last several months seen the prices of oil and fuel rise once again, and we have seen increases in steel prices. Anticipated cost increases and reductions are considered in our bids to customers on proposed new construction projects.

In order to mitigate our exposure to increases in fuel prices, in April 2011, we commenced a program to hedge our exposure to increases in diesel fuel prices by entering into diesel futures contracts. We believe that the gains and losses on these contracts will tend to offset increases and decreases in the price we pay for diesel fuel and reduce the volatility of such fuel costs in our operations. Through April 29, 2011, we had entered into diesel futures contracts for 412,000 gallons at $1.4 million, the quoted market value at that date. We will continue to evaluate this strategy and may increase or decrease our commitments depending on our forecast of the diesel fuel market and other operational considerations. There can be no assurance that this strategy will be successful.

Where we are the successful bidder on a project, we can generally execute purchase orders with material suppliers and contracts with subcontractors covering the prices of most materials and services, other than oil and fuel products, thereby mitigating future price increases and supply disruptions. These purchase orders and contracts do not contain quantity guarantees and we have no obligation for materials and services beyond those required to complete the contracts with our customers. Some of the purchase orders and subcontracts do, however, contain cost escalators. There can be no assurance that oil and fuel used in our business or the purchase orders and subcontracts with escalators will be adequately covered by the estimated costs we have included in our bids or that all of our vendors will fulfill their pricing and supply commitments under their purchase orders and contracts with the Company. We adjust our total estimated costs on our projects when we believe it is probable that we will have cost increases which will not be recovered from customers, vendors or re-engineering.

### Off-Balance Sheet Arrangements and Joint Ventures

As discussed further in “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operation−Off-Balance Sheet Arrangements and Joint Ventures” in the 2010 Form 10-K, we participate in various construction joint venture partnerships in order to share expertise, risk and resources for certain highly complex projects. The venture’s contract with the project owner typically requires joint and several liability among the joint venture partners. At March 31, 2011 there was approximately $872 million of construction work to be completed on unconsolidated construction joint venture contracts of which $285 million represented our proportionate share. Due to the joint and several liability under our joint venture arrangements, if one of our joint venture partners fails to perform, we and the remaining joint venture partners, would be responsible for completion of the outstanding work. As of March 31, 2011, we are not aware of situations that would require us to fulfill responsibilities of our joint venture partners pursuant to the joint and several liability under our contracts.

The only other off-balance sheet arrangements are related to the operating leases discussed in Note 9 and commitments and contingencies discussed in Note 13 to consolidated financial statements included in the 2010 Form 10-K and Note 5 of the accompanying condensed consolidated financial statements.

## Market risk

As filed, 390 characters.

Changes in interest rates are one of our sources of market risks. Outstanding indebtedness under our Credit Facility bears interest at floating rates. The average borrowings under this facility during the three months ended March 31, 2011 were $0.1 million.

See “Inflation” above regarding risks associated with materials and fuel purchases required to complete our construction contracts.

## Controls and procedures

As filed, 2,488 characters.

### Evaluation of Disclosure Controls and Procedures

Disclosure controls and procedures include, without limitation, controls and procedures designed to ensure that information required to be disclosed by an issuer in the reports that it files or submits under the Securities Exchange Act of 1934 is accumulated and communicated to the issuer’s management, including the principal executive and principal financial officers, or persons performing similar functions, as appropriate to allow timely decisions regarding required disclosure.

The Company’s principal executive officer and principal financial officer reviewed and evaluated the Company’s disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Securities Exchange Act of 1934). Based on that evaluation, the Company’s principal executive officer and principal financial officer concluded that the Company’s disclosure controls and procedures were effective at March 31, 2011 to ensure that the information required to be disclosed by the Company in this Report is recorded, processed, summarized and reported within the time periods specified in the Securities and Exchange Commission’s rules and forms and is accumulated and communicated to the Company's management including the principal executive and principal financial officers, as appropriate to allow timely decisions regarding required disclosure.

### Changes in Internal Control over Financial Reporting

We maintain a system of internal control over financial reporting that is designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with accounting principles generally accepted in the United States. Based on the most recent evaluation, we have concluded that no significant changes in our internal control over financial reporting occurred during the first three months of 2011 that have materially affected or are reasonably likely to materially affect, our internal control over financial reporting.

### Inherent Limitations on Effectiveness of Controls

Internal control over financial reporting may not prevent or detect all errors and all fraud. Also, projections of any evaluation of effectiveness of internal control to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

Filed May 10, 2011.
Source: SEC EDGAR, the filing index for accession 0000874238-11-000012. Last ingested by Listed: Nov 5, 2026, 14:02 ET. No prices; not investment advice.