# Sterling Infrastructure, Inc.: Form 10-Q for the period ended Jun 30, 2011

- Company: [Sterling Infrastructure, Inc.](/companies/strl.md) (CIK 874238)
- Form: 10-Q
- Filed: 2011-08-08
- Accepted by EDGAR: Aug 8, 2011, 06:48 ET
- Period: 2011-06-30
- Accession: 0000874238-11-000020
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/874238/000087423811000020/form_10q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/874238/000087423811000020/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2011-06-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2011-04-01 to 2011-06-30 | $128.5m | us-gaap:Revenues |
| Revenue | 6 months, 2011-01-01 to 2011-06-30 | $227.7m | us-gaap:Revenues |
| Cost of revenue | 3 months, 2011-04-01 to 2011-06-30 | $114.9m | us-gaap:CostOfGoodsSold |
| Cost of revenue | 6 months, 2011-01-01 to 2011-06-30 | $206.6m | us-gaap:CostOfGoodsSold |
| Gross profit | 3 months, 2011-04-01 to 2011-06-30 | $13.6m | us-gaap:GrossProfit |
| Gross profit | 6 months, 2011-01-01 to 2011-06-30 | $21.2m | us-gaap:GrossProfit |
| Operating income | 3 months, 2011-04-01 to 2011-06-30 | $7.3m | us-gaap:OperatingIncomeLoss |
| Operating income | 6 months, 2011-01-01 to 2011-06-30 | $9.0m | us-gaap:OperatingIncomeLoss |
| Income tax | 3 months, 2011-04-01 to 2011-06-30 | $1.1m | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 6 months, 2011-01-01 to 2011-06-30 | $1.3m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2011-04-01 to 2011-06-30 | $4.2m | us-gaap:NetIncomeLoss |
| Net income | 6 months, 2011-01-01 to 2011-06-30 | $4.3m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2011-04-01 to 2011-06-30 | $0.25 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 6 months, 2011-01-01 to 2011-06-30 | $0.26 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2011-04-01 to 2011-06-30 | $0.26 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 6 months, 2011-01-01 to 2011-06-30 | $0.26 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2011-04-01 to 2011-06-30 | 16,594,509 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 6 months, 2011-01-01 to 2011-06-30 | 16,604,368 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 6 months, 2011-01-01 to 2011-06-30 | $6.6m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 6 months, 2011-01-01 to 2011-06-30 | $15.2m | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Share repurchases | 6 months, 2011-01-01 to 2011-06-30 | $1.8m | us-gaap:PaymentsForRepurchaseOfCommonStock |
| Cash and equivalents | at 2011-06-30 | $10.3m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2011-06-30 | $178.7m | us-gaap:AssetsCurrent |
| Total assets | at 2011-06-30 | $375.9m | us-gaap:Assets |
| Current liabilities | at 2011-06-30 | $72.7m | us-gaap:LiabilitiesCurrent |
| Long-term debt | at 2011-06-30 | $299.0k | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2011-06-30 | $73.0k | us-gaap:LongTermDebtCurrent |
| Shareholders' equity | at 2011-06-30 | $253.4m | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 34,760 characters.

### Forward Looking Statements

This Report includes statements that are, or may be considered to be, "forward-looking statements" within the meaning of Section 27A of the Securities Act of 1933, as amended, or the Securities Act and Section 21E of the Securities Exchange Act of 1934, as amended, or the Exchange Act. These forward-looking statements are included throughout this Report, including this "Management's Discussion and Analysis of Financial Condition and Results of Operations" and relate to matters such as our industry, business strategy, goals and expectations concerning our market position, future operations, margins, profitability, capital expenditures, liquidity and capital resources and other financial and operating information. We have used the words "anticipate," "assume," "believe," "budget," "continue," "could," "estimate," "expect," "forecast," "future," "intend," "may," "plan," "potential," "predict," "project," "should," "will," "would" and similar terms and phrases to identify forward-looking statements in this Report.

Forward-looking statements reflect our current expectations as of the date of this report regarding future events, results or outcomes. These expectations may or may not be realized. Some of these expectations may be based upon assumptions or judgments that prove to be incorrect. In addition, our business and operations involve numerous risks and uncertainties, many of which are beyond our control, that could result in our expectations not being realized or otherwise could materially affect our financial condition, results of operations and cash flows.

Actual events, results and outcomes may differ materially from our expectations due to a variety of factors. Although it is not possible to identify all of these factors, they include, among others, the following:

- changes in general economic conditions, including the recent economic downturn, reductions in federal, state and local government funding for infrastructure services and changes in those governments’ budgets, practices, laws and regulations;
- delays or difficulties related to the completion of our projects, including additional costs, reductions in revenues or the payment of liquidated damages, or delays or difficulties related to obtaining required governmental permits and approvals;
- actions of suppliers, subcontractors, design engineers, joint venture partners, customers, competitors, banks, surety companies and others which are beyond our control, including suppliers’, subcontractors’ and joint venture partners’ failure to perform;
- the effects of estimates inherent in our percentage-of-completion accounting policies, including onsite conditions that differ materially from those assumed in our original bid, contract modifications, mechanical problems with our machinery or equipment and effects of other risks discussed in this document;
- cost escalations associated with our contracts, including changes in availability, proximity and cost of materials such as steel, cement, concrete, aggregates, oil, fuel and other construction materials, and cost escalations associated with subcontractors and labor;
- our dependence on a few significant customers;
- adverse weather conditions; although we prepare our budgets and bid contracts based on historical rain and snowfall patterns, the incidence of rain, snow, hurricanes, etc., may differ materially from these expectations;
- the presence of competitors with greater financial resources or lower margin requirements than us, and the impact of competitive bidders on our ability to obtain new backlog at reasonable margins acceptable to us;
- our ability to successfully identify, finance, complete and integrate acquisitions;
- citations issued by any governmental authority, including the Occupational Safety and Health Administration;
- federal, state and local environmental laws and regulations, the noncompliance of which can result in penalties and /or termination of contracts as well as civil and criminal liability;
- the current instability of financial institutions, which could cause losses on our cash and cash equivalents and short-term investments; and
- adverse economic conditions in our markets in Texas, Utah and Nevada.

Stockholders and potential investors are urged to carefully consider these factors and the other factors described under “Risk Factors” in Item 1A of the 2010 Form 10-K for the year ended December 31, 2010 in evaluating any forward-looking statements and are cautioned not to place undue reliance on these forward-looking statements. Although we believe that our plans, intentions and expectations reflected in or suggested by the forward-looking statements that we make in this report are reasonable, we can provide no assurance that such plans, intentions or expectations will be achieved.

The forward-looking statements included in this Report are made only as of the date of this Report, and we undertake no obligation to update any information contained in this Report or to publicly release the results of any revisions to any forward-looking statements to reflect events or circumstances that occur, or that we become aware of after the date of this Report, except as may be required by applicable securities laws.

### Overview

We are a company that operates in one segment, heavy civil construction, through our subsidiaries, which specialize in the building, reconstruction and repair of transportation and water infrastructure primarily in large and growing markets in Texas, Utah, Nevada and other states in which we see opportunities. Transportation infrastructure projects include highways, roads, bridges and light and commuter rail. Water infrastructure projects include water, wastewater and storm drainage systems. Sterling provides general contracting services, including excavating, concrete and asphalt paving, installation of large-diameter water and wastewater distribution systems, construction of bridges and similar large structures, construction of light and commuter rail infrastructure, concrete and asphalt batch plant operations, concrete crushing and aggregate operations primarily to public sector clients. We perform the majority of the work required by our contracts with our own crews and equipment.

Our business was founded in 1955 and has a history of profitable growth, which we have achieved by expanding both our service profile and our market areas. This has involved adding services, such as concrete operations, in order to capture a greater percentage of available work in current and potential markets. It also involved strategically expanding operations, either by establishing an office in a new market, often after having successfully bid on and completed a project in that market, or by acquiring a company that gives us an immediate entry into a market.

For a more detailed discussion of the Company's business, readers of this report are advised to review Item 1, Business, of the 2010 Form 10-K for the year ended December 31, 2010.

### Our Markets

Demand for transportation and water infrastructure depends on a variety of factors, including overall population growth, economic expansion and the vitality of the market areas in which we operate, as well as unique local topographical, structural and environmental issues. In addition to these factors, demand for the replacement of infrastructure is driven by the general aging of infrastructure and the need for technical improvements to achieve more efficient or safer use of infrastructure and resources. Funding for this infrastructure depends on federal, state and local governmental resources, budgets and authorizations. Each of these factors is discussed more fully in “Item 1. Business−Our Markets” in the 2010 Form 10-K.

According to 2010 U.S. Census Bureau information, Texas, Utah and Nevada each experienced significant population growth from 2005 to 2010 and over the long-term these states are expected to continue to experience population increases from 25.1 million, 2.8 million and 2.7 million people in 2010, respectively, to populations of over 33 million, 3 million and 4 million, respectively, by 2030.

In 2007, the voters of the State of Texas approved $5.0 billion in bonds for highway construction to be repaid out of the State's general funds; the governor’s request for the State's 2012-2013 biennium budget for highways and bridges includes $1 billion of proceeds from these bonds (“Prop 12 Bonds”) in 2012 and $1 billion in 2013.

The estimated Texas Department of Transportation (“TXDOT”) lettings (contract awards) for transportation construction projects are $4.8 billion for the state’s fiscal year ending August 31, 2011, including stimulus funds and a portion of the Prop 12 Bonds discussed above versus approximately $4.2 billion of lettings in 2010 including stimulus funds and a portion of the Prop 12 Bonds. In the 2011 legislative session, the Texas legislature approved the use of the remaining $3.0 billion of the Prop 12 Bonds for highway and bridge construction, rehabilitation and maintenance in the 2012-2013 budget. TXDOT is forecasting lettings of only $2.6 billion for 2012 and $2.4 billion for 2013 before any appropriations from the Prop 12 Bonds which would increase the amount of lettings for 2012 and 2013.

The Utah Governor’s budget recommends $750 million for transportation capital projects in 2012 versus authorization of $1.2 billion for 2011. Information we have received indicates that there will be a substantial reduction of highway and bridge construction projects in 2013 versus 2012.

The governor’s recommended budget for the Nevada Department of Transportation (“NDOT”) expenditures is $377 million and $369 million for fiscal years 2012 and 2013, respectively, including economic stimulus funds for highways and bridges.

Our water and wastewater, underground utility, light and commuter rail and non-highway paving work is generally funded by municipalities and other local authorities. The size and growth rates of these markets are difficult to determine as a whole, given the number of municipalities, the differences in funding sources and variations in local budget. Two of the many municipalities that we perform work for are discussed below.

The City of Houston’s Capital Improvement Plan includes $719 million and $598 million in the fiscal years ending June 30, 2012 and 2013, respectively, for transportation and water infrastructure projects.

The City of San Antonio’s budget for streets and drainage construction is $313 million and $156 million for its fiscal years 2011 and 2012, respectively.

We also do work for the U.S. government, other states and cities, counties and tollroad, business area redevelopment and regional water authorities, which have substantial water and transportation infrastructure spending budgets.

Since 2008, the bidding environment in our markets has been much more competitive because of the following:

- While our business includes only minimal residential and commercial infrastructure work, the severe fall-off in new projects in those markets has resulted in some residential and commercial infrastructure contractors bidding on smaller public sector transportation and water infrastructure projects, sometimes at bid levels below our break-even pricing, thus increasing competition and creating downward pressure on bid prices in our markets.
- Traditional competitors on larger transportation and water infrastructure projects also appear to have been bidding at less than normal margins, sometimes at bid levels below our break-even pricing, in order to replenish their reduced backlogs.
- The entrance of new competitors from other states.

These factors have limited our ability to increase our backlog through successful bids for new projects and have compressed the profitability on the new projects where we submitted successful bids. While we have been more aggressive in reducing the anticipated margins we use to bid on some projects, we have not bid at anticipated loss margins in order to obtain new backlog.

Recent reductions in miles driven in the U.S. and more fuel efficient vehicles have reduced federal and state gasoline taxes and tolls collected. In addition, the federal government has not renewed the five-year SAFETEA-LU bill, which provided states with substantial funding for transportation infrastructure projects. Since the SAFETEA-LU bill expired on September 30, 2009, the federal government has been extending financial assistance to the states on an interim basis, most recently through September 30, 2011. Continued deferral of new funding legislation or reductions in federal funding may negatively impact the states’ highway and bridge construction contract awards for their fiscal years 2011, 2012 and beyond. We had anticipated these matters would be resolved by now; however, they have not yet been resolved, and we are unable to predict when or on what terms the federal government might renew the SAFETEA-LU bill or enact other similar legislation. The ongoing disagreements in Congress over balancing the federal budget in the short-term and long-term as well as reducing the federal deficit add to the uncertainties surrounding the renewal or enactment of federal highway funding legislation.

Further, the nationwide decline in home sales, the increase in foreclosures and a prolonged recession have resulted in decreases in property taxes and some other local taxes, which are among the sources of funding for municipal road, bridge and water infrastructure construction. Expenditures by municipalities may also be limited due to federal, state and local funding limitations in the current economic environment.

These and other factors have adversely affected the levels of transportation and water infrastructure capital awards and expenditures in our markets, reducing bidding opportunities to replace backlog and increasing competition for new projects. Assuming that these factors continue to affect infrastructure capital expenditures in our markets in the near term, and taking into account the lower anticipated margins bid on some projects the Company has recently been awarded and has started or expects to start work on in 2011, we currently anticipate that the Company’s net income and diluted earnings per share of common stock attributable to Sterling common stockholders for 2011 will be significantly less than the results we achieved for 2010.

We do, however, expect that our markets will ultimately recover from the conditions described above and that our backlog and revenues will grow and gross margins, net income and earnings per share will return to levels more consistent with historical rates of return. However, we cannot predict the timing of such a return to historical normalcy in our markets. We believe that the Company is in sound financial condition and has the resources and management experience to weather current market conditions and to continue to compete successfully for projects as they become available at acceptable profit margin levels. See “Business−Markets and Customers−Our Markets” in the 2010 Form 10-K for a more detailed discussion of our markets and their funding sources.

### Results of Operations

#### Backlog at June 30, 2011

Backlog is our estimate of the revenues that we expect to earn in future periods on our construction projects which are typically completed in 12 to 36 months. At June 30, 2011, our backlog was $720 million as compared to $740 million as of March 31, 2011 and $557 million at June 30, 2010. Our backlog at June 30, 2011 included approximately $185 million of expected revenues for which the contracts had not yet been officially awarded. Historically, subsequent non-awards of contracts or finalization of contract price have not materially affected our backlog, results of operations or financial condition. Backlog at June 30, 2011, includes $28 million applicable to consolidated joint ventures where we have a controlling interest, which is the entire amount of such joint ventures’ backlog, and $163 million where we have a noncontrolling interest, which represents our proportionate share of such joint ventures’ backlog. We were awarded or apparent low bidder on contracts of $104 million during the second quarter of 2011. Backlog decreased during the three months ended June 30, 2011 as a result of fewer awarded contracts in our Nevada and Utah markets.

Substantially all of the contracts in our backlog may be canceled at the election of the customer; however, we have not been materially adversely affected by contract cancellations or modifications in the past.

#### Three and Six Months Ended June 30, 2011 Compared with Three and Six Months Ended June 30, 2010 (Amounts in thousands)

|  | Three Months ended June 30, 2011 | 2010 | % Change | Six Months ended June 30, 2011 | 2010 | % Change |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Revenues | $128,498 | $116,865 | 10.0% | $227,740 | $203,022 | 12.2% |
| Gross Profit | 13,582 | 12,703 | 6.9 | 21,181 | 20,956 | 1.1 |
| General and administrative expenses, net | (6,300) | (5,241) | 20.2 | (12,356) | (10,708) | 15.4 |
| Other income (loss) | 5 | (83) |  | 150 | (52) |  |
| Operating income | 7,287 | 7,379 | (1.2) | 8,975 | 10,196 | (12.0) |
| Gains (loss) on the sale of securities and other | (41) | 547 |  | (245) | 964 |  |
| Interest income | 565 | 483 |  | 943 | 685 |  |
| Interest expense | (374) | (297) |  | (588) | (594) |  |
| Income before taxes | 7,437 | 8,112 | (8.3) | 9,085 | 11,251 | (19.3) |
| Income tax expense | (1,145) | (2,263) | (49.4) | (1,311) | (3,121) | (58.0) |
| Net income | 6,292 | 5,849 | 7.6 | 7,774 | 8,130 | (4.4) |
| Noncontrolling owners’ interests in earnings of subsidiaries and joint ventures | (2,081) | (1,182) | 76.1 | (3,519) | (1,911) | 84.1 |
| Net income attributable to Sterling common stockholders | $4,211 | $4,667 | (9.8) | $4,255 | $6,219 | (31.6) |
| Gross margin | 10.6% | 10.9% | (2.8) | 9.3% | 10.3% | (9.7) |
| Operating margin | 5.7% | 6.3% | (9.5) | 3.9% | 5.0% | (22.0) |

|  | Amount as of June 30, 2011 | March 31, 2011 | December 31, 2010 |
| --- | ---: | ---: | ---: |
| Contract Backlog, end of period | $720,000 | $740,000 | $660,000 |

#### Revenues

Revenues increased $11.6 million and $24.7 million for the three and six months ended June 30, 2011, respectively, versus the comparable 2010 periods. This increase was primarily due to increased activity levels in 2011 as a result of execution on contracts awarded in our Texas markets in 2010 and increased revenues resulting from a higher level of activity on joint ventures in which we participate, primarily in Utah. Revenues for Nevada declined between the periods due to fewer contracts in progress. The increase in revenues in Texas was less than expected due to severe adverse weather conditions during the first quarter of 2011 and delays in starting two sizable contracts.

#### Gross Profit

At June 30, 2011, we had approximately 65 contracts-in-progress which were less than 90% complete of various sizes, of different expected profitability and in various stages of completion. The nearer a contract progresses toward completion, the more visibility we have in refining our estimate of total revenues (including incentives, delay penalties and change orders), costs and gross profit. Thus gross profit as a percent of revenues can increase or decrease from comparable and sequential quarters due to variations among contracts and depending upon which contracts are just commencing or are at a more advanced stage of completion.

While gross profit increased during the three and six months ended June 30, 2011 versus gross profit for the comparable 2010 periods, gross margins decreased from 10.9% during the three months ended June 30, 2010 to 10.6% for the three months ended June 30, 2011, and for the six month period, the gross margin decreased from 10.3% in 2010 to 9.3% in 2011. Gross margins have been negatively impacted by the on-going competitive bidding pressures since 2008. In addition, lower than expected activity levels in Texas and Nevada resulted in under absorption of indirect costs. These decreases were partially offset by higher margins on jobs completed or nearing completion.

#### Operating Income

Operating income decreased $0.1 million during the second quarter of 2011 from operating income in the second quarter of 2010. For the six months ended June 30, 2011, operating income decreased by $1.2 million versus the comparable 2010 period. The decreases between periods were a result of an increase in general and administrative expenses due primarily to an increase in salaries, wages and related benefits partially offset by the increase in gross profit.

#### Gain (Loss) on Sale of Securities and Other

In the second quarter of 2011, we had a loss on the sale of securities and other income (loss) of $41,000 versus a gain of $547,000 in the second quarter of 2010. The six months ended June 30, 2011 included a loss incurred during the first quarter related to the sale of our position in certain exchange traded fund (“ETF”) securities, the assets of which were a crude oil commodity pool. The gains for the six months ended June 30, 2010 were primarily related to gains on the ETF securities as well as improved returns from mutual fund investments.

#### Income Taxes

Our effective income tax rates for the six months ended June 30, 2011 and 2010 were 14.4% and 27.7%, respectively, and varied from the statutory rate primarily as a result of net income attributable to the noncontrolling interest owners which is taxed to those owners rather than Sterling. In addition, the effective tax rate for the six months ended June 30, 2011 declined from the effective rate for the comparable prior year period as the 2011 period includes a $0.5 million decrease to the estimated state tax expense for 2010 identified in connection with the preparation of the 2010 state income tax returns.

#### Net Income Attributable to Noncontrolling Interests

The net income attributable to noncontrolling owners’ interests in earnings of subsidiaries and joint ventures increased because of an increase in earnings from those entities, primarily as a result of a higher level of activity.

### Historical Cash Flows

The following table sets forth information about our cash flows and liquidity (in thousands):

| Net cash provided by (used in): | Six Months Ended June 30, 2011 | 2010 |
| --- | ---: | ---: |
| Operating activities | $6,568 | $23,743 |
| Capital expenditures | (15,171) | (3,605) |
| Net purchases of short-term securities | (24,561) | (20,915) |
| Other investing activities | 564 | 465 |
| Financing activities | (6,574) | (17,271) |
|  | **Amount as of** |  |
|  | **June 30, 2011** | **December 31, 2010** |
| Cash and cash equivalents | $10,267 | $49,441 |
| Working capital | $106,017 | $107,278 |

#### Operating Activities

*Significant* non-cash items for the six month periods included in operating activities are:

- depreciation and amortization, which totaled $8.4 million in the 2011 period, an increase of $0.3 million from 2010 primarily as a result of equipment additions and;
- deferred tax expense was $1.7 million in the 2011 period, versus deferred tax expense of $0.9 million in 2010; deferred tax expense in both periods is mainly attributable to amortization for tax return purposes of goodwill and accelerated tax depreciation. The increase in deferred tax expense between the periods is due to the difference between accelerated tax depreciation over book depreciation in 2011 versus 2010, primarily due to recent tax law changes which allow the expensing for tax return purposes in 2011 of new equipment additions.

Besides net income of $7.8 million for the six months ended June 30, 2011 and the non-cash items discussed above, other significant components of cash flows from operations were:

- an increase in contracts receivable in the first half of 2011 of $7.3 million primarily because of higher activity levels resulting in higher billings at the end of June 30, 2011 versus December 31, 2011 for our operations in Utah and Nevada;
- an increase in costs and estimated earnings in excess of billings on uncompleted projects of $9.4 million because of an unusual amount of jobs starting near June 30, 2011 along with an increase in the volume of materials purchased on other existing jobs at June 30, 2011as compared to December 2010. Further, December 2010 was impacted by lower activity due to the holiday season;
- income tax receivable increased $1.1 million in the first half of 2011 as a result of anticipated refunds of federal income tax payments; and
- other current liabilities increased by $2.4 million in the first six months of 2011 primarily due an increase in accrued job costs reflecting higher activity levels.

#### Investing Activities

During the six months ended June 30, 2011 and 2010, the Company had net purchases of short-term securities of $24.6 million and $20.9 million, respectively. The net purchases were funded by cash held at the beginning of the years as well as cash generated by operations.

Expenditures for the purchase of certain equipment and to expand office and shop facilities totaled $15.2 million in the first six months of 2011 versus $3.6 million in the first six months of 2010. The increase in 2011 is consistent with management’s expectations that capital expenditures in 2011 will be higher than 2010 as a result of normal replacement of equipment, which replacement was deferred in 2009 and 2010; additional equipment required by a Utah joint venture project and a recent low bid on a large job in Texas; and shop and office facilities to be acquired by two of our offices in Texas.

On August 1, 2011 the Company used $8 million of existing cash and short-term investments to fund the purchase of the acquisition of J. Banicki Construction, Inc., a heavy civil construction business operating in Arizona. Additional purchase price of up to $5 million may be paid in connection with this acquisition subject to the achievement of certain earnings requirements during the period from 2011 through July 31, 2016. Also on August 1, 2011, the Company acquired a 50% interest in a construction limited partnership located in California. The Company paid a purchase price of $1.3 million which was funded by available cash of the Company. See Note 11 for further information.

#### Financing Activities

Cash used in financing activities of $6.6 million in the first six months of 2011 primarily relates to distributions to noncontrolling interest owners while cash used in financing activities of $17.3 million in the first six months of 2010 primarily reflects a reduction of $15.0 million in borrowings under our $75.0 million Credit Facility.

### Liquidity and Sources of Capital

The need for working capital for our business varies due to fluctuations in:

- customer receivables and contract retentions;
- costs and estimated earnings in excess of billings;
- billings in excess of costs and estimated earnings;
- the size and status of contract mobilization payments and progress billings; and
- the amounts owed to suppliers and subcontractors.

Some of these fluctuations can be significant.

As of June 30, 2011, we had working capital of $106 million, a decrease of $1.3 million from December 31, 2010. The decrease in working capital in the six months ended June 30, 2011 was the result of the following (in thousands):

|  |  |
| --- | ---: |
| Net income | $7,774 |
| Depreciation and amortization | 8,436 |
| Deferred tax expense | 1,665 |
| Capital expenditures | (15,171) |
| Distributions paid to noncontrolling interest owners | (4,818) |
| Treasury stock purchases | (1,841) |
| Reclassification of amounts payable to noncontrolling interest owner | 1,054 |
| Other | 1,640 |
| Total decrease in working capital | $(1,261) |

In addition to our available cash and cash equivalents, short term investments and cash provided by operations, we use borrowings under our Credit Facility with Comerica Bank to finance our capital expenditures and working capital needs.

We have a $75.0 million Credit Facility with a bank syndicate for which Comerica Bank is a participant and agent. The Credit Facility has a maturity date of October 31, 2012, and is secured by all assets of the Company, other than proceeds and other rights under our construction contracts which are pledged to our bond surety. Borrowings under the Credit Facility are used to finance working capital. At June 30, 2011, there were no borrowings outstanding under the Credit Facility; however, there were letters of credit of $1.8 million outstanding under the Credit Facility resulting in availability under the Credit Facility of $73.2 million. To date we have not experienced any difficulty in borrowing under our Credit Facility or any material change in its terms, and the Company was in compliance with all covenants under the Credit Facility as of June 30, 2011.

As is customary in the construction business, we are required to provide surety bonds to secure our performance under construction contracts. Our ability to obtain surety bonds primarily depends upon our capitalization, working capital, past performance, management expertise and reputation and certain external factors, including the overall capacity of the surety market. Surety companies consider such factors in relationship to the amount of our backlog and their underwriting standards, which may change from time to time. We have pledged all proceeds and other rights under our construction contracts to our bond surety company. Events that affect the insurance and bonding markets may result in bonding becoming more difficult to obtain in the future, or being available only at a significantly greater cost. To date, we have not encountered difficulties or material cost increases in obtaining new surety bonds.

The Company believes that it has sufficient liquid financial resources, including the $73.2 million unused portion of its Credit Facility at June 30, 2011, to fund its requirements for the next twelve months of operations, including its bonding requirements, and the Company expects no material adverse change in its liquidity. Future developments or events, such as an increase in our level of purchases of equipment to support significantly higher backlog or an acquisition of another company could, however, affect our level of working capital and tangible net worth. See “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operation−Sources of Capital” in the 2010 Form 10-K for further discussion of the covenants and restrictions under the Credit Facility.

### Inflation

Until 2008, inflation had not had a material impact on our financial results; however, that year's increases in oil and fuel prices affected our cost of operations. While the prices we have paid for oil and fuel and, generally, for other materials have decreased since 2008, in 2011 we have seen the prices of oil and fuel rise once again, and we have seen increases in steel prices. Anticipated cost increases and reductions are considered in our bids to customers on proposed new construction projects.

In order to mitigate our exposure to increases in fuel prices, in April 2011, we commenced a program to hedge our exposure to increases in diesel fuel prices by entering into diesel futures contracts. We believe that the gains and losses on these contracts will tend to offset increases and decreases in the price we pay for diesel fuel and reduce the volatility of such fuel costs in our operations. As of June 30, 2011, we had diesel futures contracts for 1,790,000 gallons which fixed prices at an average of $3.12 per gallon. This compares to the June 30, 2011 price for off-road ultra-low sulphur diesel published by Platts of $2.97. We will continue to evaluate this strategy and may increase or decrease our commitments depending on our forecast of the diesel fuel market and other operational considerations. There can be no assurance that this strategy will be successful.

Where we are the successful bidder on a project, we can generally execute purchase orders with material suppliers and contracts with subcontractors covering the prices of most materials and services, other than oil and fuel products, thereby mitigating future price increases and supply disruptions. These purchase orders and contracts do not contain quantity guarantees and we have no obligation for materials and services beyond those required to complete the contracts with our customers. Some of the purchase orders and subcontracts do, however, contain cost escalators. There can be no assurance that oil and fuel used in our business or the purchase orders and subcontracts with escalators will be adequately covered by the estimated costs we have included in our bids or that all of our vendors will fulfill their pricing and supply commitments under their purchase orders and contracts with the Company. We adjust our total estimated costs on our projects when we believe it is probable that we will have cost increases which will not be recovered from customers, vendors or re-engineering.

### Off-Balance Sheet Arrangements and Joint Ventures

As discussed further in “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operation−Off-Balance Sheet Arrangements and Joint Ventures” in the 2010 Form 10-K, we participate in various construction joint ventures in order to share expertise, risk and resources for certain highly complex projects. The venture’s contract with the project owner typically requires joint and several liability among the joint venture partners. At June 30, 2011, there was approximately $763 million of construction work to be completed on unconsolidated construction joint venture contracts, of which $163 million represented our proportionate share. Due to the joint and several liability under our joint venture arrangements, if one of our joint venture partners fails to perform, we and the remaining joint venture partners would be responsible for completion of the outstanding work. As of June 30, 2011, we are not aware of situations that would require us to fulfill responsibilities of our joint venture partners pursuant to the joint and several liabilities under our contracts.

The only other off-balance sheet arrangements are related to the operating leases discussed in Note 9 and commitments and contingencies discussed in Note 13 to the consolidated financial statements included in the 2010 Form 10-K and Note 6 of the accompanying condensed consolidated financial statements.

## Market risk

As filed, 1,432 characters.

Changes in interest rates are one of our sources of market risks. Outstanding indebtedness under our Credit Facility bears interest at floating rates. The average borrowings under this facility during the six months ended June 30, 2011 were $0.1 million.

We are exposed to market risk from changes in commodity prices. In the normal course of business, we enter into derivative transactions, specifically cash flow hedges, to mitigate our exposure to commodity price movements. We do not participate in these transactions for trading or speculative purposes. While the use of these arrangements may limit the benefit to us of decreases in the prices of diesel fuel, it also limits the risk of adverse price movements. The following represents the outstanding contracts at June 30, 2011:

| Period | Beginning | Ending | Price Per Gallon Range | Weighted Average | Remaining Volume (gallons) | Fair Value at June 30, 2011 (in thousands) |
| --- | --- | --- | --- | ---: | ---: | ---: |
| July 1, 2011 – December 31, 2011 | July 1, 2011 | December 31, 2011 | $3.08 – 3.11 | $3.09 | 1,000,000 | $(89) |
| 2012 | January 1, 2012 | December 31, 2012 | 3.02 – 3.34 | 3.17 | 520,000 | (71) |
| 2013 | January 1, 2013 | December 31, 2013 | 2.99 – 3.29 | 3.11 | 270,000 | (34) |
|  |  |  |  |  |  | $(194) |

See “Inflation” above regarding risks associated with materials and fuel purchases required to complete our construction contracts.

## Controls and procedures

As filed, 2,493 characters.

### Evaluation of Disclosure Controls and Procedures

Disclosure controls and procedures include, without limitation, controls and procedures designed to ensure that information required to be disclosed by an issuer in the reports that it files or submits under the Securities Exchange Act of 1934 is accumulated and communicated to the issuer’s management, including the principal executive and principal financial officers, or persons performing similar functions, as appropriate to allow timely decisions regarding required disclosure.

The Company’s principal executive officer and principal financial officer reviewed and evaluated the Company’s disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Securities Exchange Act of 1934). Based on that evaluation, the Company’s principal executive officer and principal financial officer concluded that the Company’s disclosure controls and procedures were effective at June 30, 2011 to ensure that the information required to be disclosed by the Company in this Report is recorded, processed, summarized and reported within the time periods specified in the Securities and Exchange Commission’s rules and forms and is accumulated and communicated to the Company's management including the principal executive and principal financial officers, as appropriate to allow timely decisions regarding required disclosure.

### Changes in Internal Control over Financial Reporting

We maintain a system of internal control over financial reporting that is designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with accounting principles generally accepted in the United States. Based on the most recent evaluation, we have concluded that no significant changes in our internal control over financial reporting occurred during the three months ended June 30, 2011 that have materially affected or are reasonably likely to materially affect, our internal control over financial reporting.

### Inherent Limitations on Effectiveness of Controls

Internal control over financial reporting may not prevent or detect all errors and all fraud. Also, projections of any evaluation of effectiveness of internal control to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

Filed Aug 8, 2011.