# Sterling Infrastructure, Inc.: Form 10-K/A for the period ended Dec 31, 2021

- Company: [Sterling Infrastructure, Inc.](/companies/strl.md) (CIK 874238)
- Form: 10-K/A
- Filed: 2022-03-24
- Accepted by EDGAR: Mar 24, 2022, 16:10 ET
- Period: 2021-12-31
- Accession: 0000874238-22-000044
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/874238/000087423822000044/strl-20211231.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/874238/000087423822000044/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2021-12-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 12 months, 2021-01-01 to 2021-12-31 | $1.58bn | us-gaap:RevenueFromContractWithCustomerExcludingAssessedTax |
| Cost of revenue | 12 months, 2021-01-01 to 2021-12-31 | $1.37bn | us-gaap:CostOfGoodsAndServicesSold |
| Gross profit | 12 months, 2021-01-01 to 2021-12-31 | $214.8m | us-gaap:GrossProfit |
| Operating income | 12 months, 2021-01-01 to 2021-12-31 | $107.3m | us-gaap:OperatingIncomeLoss |
| Income tax | 12 months, 2021-01-01 to 2021-12-31 | $24.9m | us-gaap:IncomeTaxExpenseBenefit |
| Diluted EPS | 12 months, 2021-01-01 to 2021-12-31 | $2.15 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 12 months, 2021-01-01 to 2021-12-31 | $2.19 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 12 months, 2021-01-01 to 2021-12-31 | 29,101,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 12 months, 2021-01-01 to 2021-12-31 | $151.6m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 12 months, 2021-01-01 to 2021-12-31 | $46.7m | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Share repurchases | 12 months, 2021-01-01 to 2021-12-31 | $0 | us-gaap:PaymentsForRepurchaseOfCommonStock |
| Cash and equivalents | at 2021-12-31 | $81.8m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2021-12-31 | $434.7m | us-gaap:AssetsCurrent |
| Total assets | at 2021-12-31 | $1.23bn | us-gaap:Assets |
| Current liabilities | at 2021-12-31 | $351.8m | us-gaap:LiabilitiesCurrent |
| Total liabilities | at 2021-12-31 | $870.8m | us-gaap:Liabilities |
| Long-term debt | at 2021-12-31 | $428.6m | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2021-12-31 | $28.2m | us-gaap:LongTermDebtCurrent |
| Shareholders' equity | at 2021-12-31 | $358.8m | us-gaap:StockholdersEquity |

## Business

As filed, 23,892 characters.

### Overview of the Company’s Business

Sterling Construction Company, Inc. (“Sterling” or “the Company”), operates through a variety of subsidiaries within three segments specializing in Transportation, E-Infrastructure and Building Solutions in the United States (the “U.S.”), primarily across the Southern, Northeastern and Mid-Atlantic U.S., the Rocky Mountain States, California and Hawaii, as well as other areas with strategic construction opportunities. Transportation Solutions includes infrastructure and rehabilitation projects for highways, roads, bridges, airports, ports, light rail, water, wastewater and storm drainage systems. E-Infrastructure Solutions projects develop advanced, large-scale site development systems and services for data centers, e-commerce distribution centers, warehousing, transportation, energy and more. Building Solutions projects include residential and commercial concrete foundations for single-family and multi-family homes, parking structures, elevated slabs and other concrete work. From strategy to operations, we are committed to sustainability by operating responsibly to safeguard and improve society’s quality of life. Caring for our people and our communities, our customers and our investors – that is The Sterling Way.

In this report, unless the context otherwise indicates, “Sterling,” “the Company,” “we,” “our” or “us” mean Sterling and its consolidated subsidiaries. In addition, references to “Note” or “Notes” refer to the Notes to the Consolidated Financial Statements, included in Item 8 of Part II of this annual report on Form 10-K, unless indicated otherwise.

### Business Strategy

Since 2016, our strategic vision has been based on the following elements and objectives:

| Strategic Element | Strategic Objectives |
| --- | --- |
| Solidifying the base | Risk Reduction |
| Growing high margin products | Bottom-Line Growth |
| Expansion into adjacent markets | Exceed Peer Performance |
|  | Build a Platform for Future Accretive Growth |

*Solidifying the base—*The Company’s historic base business is our low-bid heavy highway projects within our Transportation Solutions segment. Heavy highway projects typically have gross margins of 7-8%; however, prior to 2016 our gross margin was approximately 4%. In 2016, we implemented a strategy to solidify this base business by improving bid discipline to significantly reduce the probability of project losses. To execute this strategic focus, a key objective, risk reduction, was prioritized. Since the implementation of the strategy and application of the key objective, we have improved the heavy highway backlog gross margin to 9.5% as of December 31, 2021, and we expect gross margins to continue improving as projects bid prior to implementing our strategy come to a completion.

*Growing high margin products—*While solidifying the base is important to the profitability of the Company, the improvement of gross margins is limited due to the highly competitive bidding environment for heavy highway projects. In 2016, we implemented a strategy to shift our project mix from low-bid heavy highway projects to alternative delivery heavy highway projects and other higher margin work (e.g., airports, commercial, piling and shoring). In 2016, our low-bid heavy highway revenue was approximately 79% of our total revenue, but we have progressively brought that down to 19% as of December 31, 2021. The key objective in this strategic area is our focus on bottom-line growth and the higher margin projects we target have gross margins in the range of 12%-15%.

*Expansion into adjacent markets—*In 2016, we implemented a strategy to pursue growth through the acquisition of companies and assets that will enable us to broaden the types of projects we execute and also expand into adjacent markets. Since 2016, we have completed four acquisitions and plan to consider other strategic acquisitions in the future. The companies we target for acquisition typically have gross margins of 15% or more. Specifically, we expanded into adjacent markets and broadened the types of projects we execute through our 2017 acquisition of Tealstone and our recent acquisitions of Plateau, Kimes and Petillo. This strategic focus allows us to broaden our portfolio of products and services, and broaden our end customer base to remain competitive in the markets where we operate.

### Recent Acquisitions

*Petillo Acquisition—*On December 30, 2021, we completed our acquisition of Petillo Incorporated and its related entities (collectively, “Petillo”) for aggregate consideration of $204.6 million, consisting of $175.0 million in cash, 759,447 shares of the Company’s common stock, and a target working capital adjustment of $1.4 million. Petillo is a leading specialty site development contractor based in Flanders, New Jersey and serves the Northeastern and Mid-Atlantic States, providing large-scale site infrastructure improvement services, including full-service excavation, underground utility construction, environmental remediation, drainage systems for commercial construction and water management and distribution systems. The results of Petillo are included within our E-Infrastructure Solutions segment. See *Note 3 - Acquisitions* for further discussion.

*Kimes Acquisition—*On December 28, 2021, we completed our acquisition of Kimes & Stone (“Kimes”) for an all-cash purchase price of $7.6 million. Kimes provides a diversified services offering of soil stabilization for site development on e-commerce projects such as large fulfillment and distribution centers and data centers, as well as soil stabilization for roadways and manufacturing plant construction. The transaction includes a fleet of soil stabilization equipment and working capital. The results of Kimes are included within Plateau which is included within our E-Infrastructure Solutions segment.

*Plateau Acquisition—*On October 2, 2019, we completed our acquisition of Plateau Excavation, Inc. and its related entities (collectively, “Plateau”) for aggregate consideration of $427.5 million, consisting of $375.0 million in cash, a working capital adjustment of $21.3 million, 1.25 million shares of the Company’s common stock, a $10.0 million subordinated promissory note that bears interest at 8% and a tax basis election of $5.0 million. Plateau is engaged in executing site development for general contractors and developers on e-commerce projects such as large fulfillment and distribution centers and data centers. The results of Plateau are included within our E-Infrastructure Solutions segment.

### Segments, Markets and Customers

The Company’s internal and public segment reporting are aligned based upon the services offered by its operating groups, which represent the reportable segments. With the December 30, 2021 acquisition of Petillo, the Company realigned its operating groups to reflect management’s present oversight of operations. After realignment, the Company’s operations consist of three reportable segments: Transportation Solutions, E-Infrastructure Solutions and Building Solutions, with our commercial business reclassified from the previously reported Specialty Services operating group into our newly formed Building Solutions operating group. See Item 7 “Management’s Discussion and Analysis of Financial Condition and Results of Operations” and *Note 21 - Segment Information* for further discussion of our business segments.

*Transportation Solutions—*Our Transportation Solutions segment is comprised of heavy highway, aviation and rail, and relies heavily on federal and state infrastructure spending. The principal markets of this segment are Arizona, California, Colorado, Hawaii, Nevada, Texas and Utah. Within these principal markets, our core customers are the Departments of Transportation (“DOT(s)”) in various states, regional transit authorities, airport authorities, port authorities, water authorities and railroads. In our Transportation Solutions segment, four state DOTs accounted for 42% of that segment’s revenue in 2021, 44% in 2020 and 43% in 2019.

*E-Infrastructure Solutions—*Our E-Infrastructure Solutions segment serves large, blue-chip end users in the e-commerce, data center, distribution center and warehousing and energy sectors. We are a leading provider of large-scale specialty site infrastructure improvement contracting services in the Southeastern, Northeastern and Mid-Atlantic U.S. In our E-Infrastructure Solutions segment, four customers accounted for 58% of that segment’s revenue in 2021 and 44% in 2020.

*Building Solutions—*Our Building Solutions segment is comprised of our residential and commercial businesses. The principal market for our residential business is Texas, specifically the Dallas-Fort Worth and Houston areas and the surrounding communities; and in 2021 we expanded our footprint into Phoenix, Arizona. Our core residential customer base is comprised of leading national home builders as well as regional and custom home builders. Our commercial business focuses on concrete construction of multi-family foundations, parking structures, elevated slabs and other concrete work for leading developers and general contractors in commercial markets. In our Building Solutions segment, four customers, including their respective affiliates, accounted for 57% of that segment’s revenue in 2021, 50% in 2020 and 46% in 2019.

We did not have any customers contribute more than 10% of our consolidated revenues in 2021; however we routinely construct projects for our largest customers mentioned above. If we lost any of these customers, it could have a material adverse effect on our financial results. Refer to Item 1A “Risk Factors” and *Note 19 - Concentration of Risk and Enterprise Wide Disclosures* for the Company’s major customers that represent a concentration of risk due to their significant revenue contributions.

### Competition

Competition for our segments ranges from small local contractors to large international construction companies. We traditionally try to position ourselves to bid on work too large for the small local contractors yet too small for the large national and international construction companies. However, if market conditions became less favorable, we would tend to see migration from both the small local contractors and large international players into that mid-level market. This, in return, could increase competitive bidding pressure and reduce both revenue growth and margins. See Item 1A “Risk Factors” for further discussion of risks associated with our competitive environment.

### Seasonality

Operations for our segments are typically affected by weather conditions primarily during the first and fourth quarters of our fiscal year, which may alter construction schedules and can create variability in our revenues, profitability and the required number of employees. For additional discussion regarding the potential impacts of seasonality on our business, see Item 1A “Risk Factors—*Adverse weather conditions may cause delays, which could slow completion of our construction activity.”*

### Resources

We purchase raw materials for our segments, including but not limited to, cement, aggregate, concrete, liquid asphalt, lumber, steel, diesel and gasoline fuel, natural gas and propane from numerous sources. The price and availability of raw materials may vary from year to year due to fluctuations in market conditions and production capacities.

### Backlog

Our remaining performance obligations on our projects are referred to as “Backlog” and represent the amount of revenues we expect to recognize in the future from our contract commitments on projects. The value of our Backlog was $1.49 billion at December 31, 2021, as compared to $1.18 billion at December 31, 2020. We exclude from Backlog contracts where we are the apparent low bidder for projects (“Unsigned Low-bid Awards”) until the contract is executed by our customer (approximately $22.5 million at December 31, 2021). Certain Building Solutions revenue is recognized upon completion at a point in time and therefore is never reflected in our backlog. See Item 7 “Management’s Discussion and Analysis of Financial Condition and Results of Operations—Market Outlook and Trends” for discussion and quantification of our Backlog. Also see Item 1A “Risk Factors.”

### Contracts

Our contracts are awarded on a competitively bid basis or negotiated bid basis using a range of contracting options, including fixed-unit price, lump sum and cost-reimbursable. Each contract is designed to optimize the balance between risk and reward. At December 31, 2021, substantially all of our backlog was contracted on a fixed-unit price or lump sum basis. We occasionally present claims or change orders to our clients for additional costs exceeding a contract price or for costs not included in the original contract price.

Substantially all of the contracts in our Backlog contain “termination for convenience” clauses which allow the customer to cancel the contract at their election but require that the Company be paid for work performed through the date of termination. As part of our business, we are a party to joint venture arrangements, pursuant to which we typically jointly bid on and execute particular projects with other companies in the construction industry. See Item 1A “Risk Factors” and Item 7 “Management’s Discussion and Analysis of Financial Condition and Results of Operations” for a discussion of our types of risk and how we mitigate cancellation and credit risk.

### Insurance and Bonding

Our buildings and equipment are covered by insurance, at levels our management believes to be adequate. In addition, we maintain general liability, excess liability, workers’ compensation and auto insurance all in amounts consistent with our risk of loss and industry practice.

As a normal part of the Transportation Solutions business and occasionally with the E-Infrastructure Solutions business, we are required to provide various types of surety and payment bonds that provide an additional measure of security for our performance under the contract. Typically, a bidder for a contract must post a bid bond, generally for 5% to 10% of the bid amount, and on being awarded the bid, must post a performance and payment bond for up to 100% of the costs to construct. Usually, upon posting of the performance bond, a contractor must also post a maintenance bond for generally 1% of the contract amount for one to two years. Our ability to obtain bonds depends upon our capitalization, working capital, aggregate contract size, past performance, management expertise and external factors, including the capacity of the overall surety market. Bonding companies consider such factors in light of the amount of our backlog that we have currently bonded and their current underwriting standards, which may change from time to time. As is customary, we have agreed to indemnify our bonding company for all losses incurred by it in connection with bonds that are issued, and we have granted our bonding company a security interest in certain assets, including accounts receivable, as collateral for such obligation.

### Government and Environmental Regulations

Our operations are subject to compliance with numerous regulatory requirements of federal, state and local agencies and authorities, including regulations concerning safety, wage and hour, and other labor issues, immigration controls, vehicle and equipment operations and other aspects of our business. For example, our operations are subject to the requirements of the Occupational Safety and Health Act (“OSHA”) and comparable state laws directed toward the protection of employees. In addition, most of our Transportation Solutions construction contracts are entered into with public authorities, and these contracts frequently impose additional governmental requirements, including requirements regarding labor relations and subcontracting with designated classes of disadvantaged businesses.

All of our operations are also subject to federal, state and local laws and regulations relating to the environment, including those relating to discharges into air, water and land, climate change, the handling and disposal of solid and hazardous waste, the handling of underground storage tanks and the cleanup of properties affected by hazardous substances. For example, we must apply water or chemicals to reduce dust on road construction projects and to contain contaminants in storm run-off water at construction sites. In certain circumstances, we may also be required to hire subcontractors to dispose of hazardous wastes encountered on a project in accordance with a plan approved in advance by the customer. Certain environmental laws impose substantial penalties for non-compliance and others, such as the federal Comprehensive Environmental Response, Compensation and Liability Act, or CERCLA, impose strict and retroactive joint and several liability upon persons responsible for releases of hazardous substances.

CERCLA and comparable state laws impose liability, without regard to fault or the legality of the original conduct, on certain classes of persons that contributed to the release of a “hazardous substance” into the environment. These persons include the owner or operator of the site where the release occurred and companies that disposed or arranged for the disposal of the hazardous substances found at the site. Under CERCLA, these persons may be subject to joint and several liability for the costs of cleaning up the hazardous substances that have been released into the environment, for damages to natural resources and for the costs of certain health studies. CERCLA also authorizes the Federal Environmental Protection Agency, or EPA, and, in some instances, third parties, to act in response to threats to the public health or the environment and to seek to recover from the responsible classes of persons the costs they incur.

Solid wastes, which may include hazardous wastes, are subject to the requirements of the Federal Solid Waste Disposal Act, the Federal Resource Conservation and Recovery Act, referred to as RCRA, and comparable state statutes. Although we do not generate solid waste, we occasionally dispose of solid waste on behalf of customers. From time to time, the EPA considers the adoption of stricter disposal standards for non-hazardous wastes. Moreover, it is possible that additional wastes will in the future be designated as “hazardous wastes.” Hazardous wastes are subject to more rigorous and costly disposal requirements than are non-hazardous wastes.

We continually evaluate whether we must take additional steps at our locations to ensure compliance with environmental laws. While compliance with applicable regulatory requirements has not materially adversely affected our operations in the past, there can be no assurance these requirements will not change and compliance will not adversely affect our operations in the future. In addition, tighter regulation for the protection of the environment and other factors may make it more difficult to obtain new permits and renewal of existing permits may be subject to more restrictive conditions than currently exist.

### Human Capital

At December 31, 2021, the Company had approximately 2,900 employees, comprised of approximately 700 salaried employees and approximately 2,200 hourly employees. The percentage of our employees represented by unions at December 31, 2021 was approximately 14%. We have agreements, which we customarily renew periodically, with various unions representing groups of employees at project sites. We consider our relationships with our employees and the applicable labor unions to be satisfactory.

Our business is dependent upon a readily available supply of management, supervisory and field personnel. Substantially all of our employees are hired on a full-time basis; however, as is typical in the construction industry, we experience a high degree of turnover as construction projects are completed. In the past, we have been able to attract a sufficient number of personnel to support the growth of our operations; however, we continue to face competition for experienced workers in all our markets.

Our employees are important to the success of our business. Hiring, developing and retaining our employees is not only important, but is a necessity for continued growth and delivery at all levels within our organization. Every employee is critical to the success of our organization and we strive daily to ensure that we are managing our workforce’s needs and requirements. We often work in tight labor markets that make hiring and retaining employees challenging. Therefore, it is critical to have a strategic plan for hiring and managing our workforce. We develop hiring practices by geographic area to ensure a customizable recruiting strategy that allows all of our businesses to thrive. Retaining our employees through various means of succession planning and other retention tools is also a critical component of our strategy, particularly for our key positions. Planning for today as well as the future is the cornerstone of our people strategy.

Our focus on diversity is at the forefront of how we operate in each of our locations. We strive to instill an inclusive culture that allows all employees the opportunity to thrive.

As of December 31, 2021, our workforce was comprised of the following race and ethnicity demographics:

| Employees as of December 31, 2021 |  |
| --- | ---: |
| Hispanic | 47.1% |
| White | 44.2% |
| Black | 4.0% |
| Pacific Islander | 2.5% |
| Other | 2.2% |

We focus on our safety processes which have allowed us to maintain a high level of safety at our work sites. All project employees receive hazard specific training and our newly-hired employees undergo an initial safety orientation and receive follow-up trainings during their first 90 days of employment. Our project managers and superintendents work closely with the safety department to ensure safety is planned into all of our operations before they begin. Daily, our project foremen are required to conduct safety briefings with employees. Regular safety walkthroughs are conducted by our managers, supervisors and safety staff to evaluate project conditions and observe employee safety behavior. To address the safety and health of our workforce due to the COVID-19 pandemic, we implemented additional employee health and safety protocols. For the Company’s office-based personnel, the Company is social distancing and, when needed, working from home. For personnel onsite at the Company’s construction sites, the Company has taken mitigation measures to prevent the spread of COVID-19, including but not limited to, social distancing, wellness checks, providing sanitation stations and wearing personal protective equipment.

### Access to Company’s Filings

The Company maintains a website at www.strlco.com on which our latest annual report on Form 10-K, recent quarterly reports on Form 10-Q, recent current reports on Form 8-K, any amendments to those filings and other filings may be accessed free of charge; some directly on the website and others through a link to the SEC’s website (www.sec.gov) where those reports are filed. Our website also has recent press releases, the Company’s code of business conduct, the charters of the audit committee, compensation and talent development committee, and corporate governance and nominating committee of the Board of Directors and information on the Company’s “whistleblower” procedures. Our website content is made available for information purposes only. It should not be relied upon for investment purposes, and none of the information on the website is intended to be incorporated into this annual report on Form 10-K by reference.

## Risk factors

As filed, 63,430 characters.

The following discussion of risk factors contains forward-looking statements. These risk factors may be important to understanding other statements in this annual report on Form 10-K. The following information should be read in conjunction with Part II, Item 7 “Management’s Discussion and Analysis of Financial Condition and Results of Operations” and the Consolidated Financial Statements and related Notes in Part II, Item 8 “Financial Statements and Supplementary Data” of this annual report on Form 10-K.

Our business, financial condition and operating results can be affected by a number of factors, whether currently known or unknown, including but not limited to those described below; any one or more of which could, directly or indirectly, cause our actual financial condition and operating results to vary materially from past, or from anticipated future, financial condition and operating results. Any of these factors, in whole or in part, could materially and adversely affect our business, prospects, financial condition, results of operations, stock price and cash flows. These could also be affected by additional factors that apply to all companies generally which are not specifically mentioned below.

Because of the following factors, as well as other factors affecting our financial condition and operating results, our past financial performance should not be considered to be a reliable indicator of our future performance, and investors should not use historical trends to anticipate results or trends in future periods.

### Risks Relating to Our Business

***If we do not accurately estimate the overall risks, requirements or costs related to a project when we bid for a contract that is ultimately awarded to us, we may achieve a lower than anticipated profit or incur a loss on the contract.***

The majority of our revenues and backlog are derived from fixed-unit price contracts and from lump sum contracts. Fixed-unit price contracts require us to provide materials and services at a fixed-unit price based on agreed quantities irrespective of our actual per unit costs. Lump sum contracts require the contract work to be completed for a single price irrespective of our actual costs incurred. Our ability to achieve profitability under such contracts is dependent upon our ability to avoid cost overruns by accurately estimating our costs and then successfully controlling our actual costs. If our cost estimates for a contract are inaccurate, or if we do not perform the contract within our cost estimates, we may incur losses due to cost overruns or the contract may be less profitable than expected. As a result, these types of contracts could negatively affect our cash flow, earnings and financial position.

The costs incurred and gross profit realized on our contracts can vary, sometimes substantially, from our original estimates due to a variety of factors, that may include the following:

- onsite conditions that differ from those assumed in the original bid or contract;
- failure to include required materials or work in a bid, or the failure to estimate properly the quantities or costs needed to complete a lump sum contract;
- delays caused by weather conditions;
- contract or project modifications creating unanticipated costs not covered by change orders or contract price adjustments;
- changes in availability, proximity and costs of materials, including steel, concrete, aggregates and other construction materials (such as stone, gravel, sand and oil for asphalt paving), as well as fuel and lubricants for our equipment;
- higher than anticipated costs to lease, acquire and maintain equipment;
- inability to predict the costs of accessing and producing aggregates and purchasing oil required for asphalt paving projects;
- availability and skill level of workers in the geographic location of a project;
- rapidly increasing labor costs;
- failure by our suppliers, subcontractors, designers, engineers, joint venture partners or customers to perform their obligations;
- fraud, theft or other improper activities by our suppliers, subcontractors, designers, engineers, joint venture partners, customers or our own personnel;
- mechanical problems with our machinery or equipment;
- citations issued by any governmental authority, including OSHA;
- difficulties in obtaining required governmental permits or approvals;
- changes in applicable laws and regulations;
- delays in quickly identifying and taking measures to address issues which arise during execution of a project; and
- claims or demands from third parties for alleged damages arising from the design, construction or use and operation of a project of which our work is a part.

Many of our contracts with public sector customers contain provisions that purport to shift some or all of the above risks from the customer to us, even in cases where the customer is partly at fault. Public sector customers may seek to impose contractual risk-shifting provisions more aggressively, which could increase risks and adversely affect our cash flow, earnings and financial position.

Substantially all of the contracts in our Backlog contain “termination for convenience” clauses which allow the customer to cancel the contract at their election but require that the Company be remunerated for work performed through the date of termination.

***We may not accurately assess the quality, and we may not accurately estimate the quantity, availability and cost, of aggregates we need to complete a project, particularly for projects in rural areas.***

Particularly for projects in rural areas, we may estimate the quality, quantity, availability and cost for aggregates (such as sand, gravel, crushed stone, slag and recycled concrete) from sources that we have not previously used as suppliers, which increases the risk that our estimates may be inaccurate. Inaccuracies in our estimates regarding aggregates could result in significantly higher costs to supply aggregates needed for our projects, as well as potential delays and other inefficiencies. If we fail to accurately assess the quality, quantity, availability and cost of aggregates, it could cause us to incur losses, which could materially adversely affect our results of operations.

***We may incur higher costs to lease, acquire and maintain equipment necessary for our operations, and the market value of our owned equipment may decline.***

We service a significant portion of our contracts with our own construction equipment rather than leased or rented equipment. To the extent that we are unable to buy construction equipment necessary for our needs, either due to a lack of available funding or equipment shortages in the marketplace, we may be forced to rent equipment on a short-term basis, which could increase the costs of performing our contracts.

The equipment that we own or lease requires continuous maintenance, for which we maintain our own repair facilities. If we are unable to utilize our own facilities to maintain the equipment in our fleet, we may be forced to obtain third party repair services, which could increase our costs.

***The industry is highly competitive, with a variety of companies competing against us, and our failure to compete effectively could reduce the number of new contracts awarded to us or adversely affect our margins on contracts awarded.***

In the past, a majority of the contracts on which we bid were awarded through a competitive bid process, with awards generally being made to the lowest bidder, but sometimes recognizing other considerations, such as shorter contract schedules or prior experience with the customer and reputation. Within our geographic markets, we compete with many international, national, regional and local construction firms. Several of these competitors have achieved greater geographic market penetration than we have in the geographic markets in which we compete, and several of our competitors have greater financial and other resources than we do. In addition, a number of international and national companies in our industry that are larger than we are and that currently do not have a significant presence in our geographic markets, if they so desire, could establish a presence in our geographic markets and compete with us for contracts.

In addition, if the use of design-build, construction manager/general contractor (CM/GC) and other alternative project delivery methods continues to increase and we are not able to further develop our capabilities and reputation in connection with these alternative delivery methods, we will be at a competitive disadvantage, which may have a material adverse effect on our financial position, results of operations, cash flows and prospects. If we are unable to compete successfully in our markets, our relative market share and profits could also be reduced.

***Our E-Infrastructure Solutions business, as well as the industries of many of our customers upon whom we are dependent, are susceptible to economic downturns, including periods of slower than anticipated economic growth.***

Demand for our E-Infrastructure Solutions business is cyclical and may be vulnerable to economic downturns, interest rate fluctuations or other adverse developments in the credit markets, and reductions in private industry spending; the effects of which may cause our customers to delay, curtail or cancel proposed and existing projects. A number of factors can adversely affect the industries we serve, including, among other things, financing or credit availability, potential bankruptcies, global and U.S. trade relationships or other geopolitical events. A reduction in cash flow or the lack of availability of debt or equity financing for our customers could cause our customers to reduce their spending for our services or affect the ability of our customers to pay amounts owed to us.

### Most of our significant contracts can be canceled on short notice.

Our contracts generally have clauses that permit the cancellation of the contract unilaterally and at any time as long as the customer pays for the work already completed. A cancellation of an unfinished contract could cause our equipment and work crews to be idle for a significant period of time until other comparable work becomes available, which could have a material adverse effect on our business and results of operations.

***The homebuilding industry is cyclical and susceptible to downward changes in general economic or other business conditions which could adversely affect our Building Solutions projects, including foundations for single-family and multi-family homes.***

The Building Solutions industry is sensitive to changes in economic conditions and other factors, such as the level of employment, consumer confidence, consumer income, availability of financing and interest rate levels. Adverse changes in any of these conditions generally, or in the markets where we operate, could decrease demand and pricing for new homes in these areas or result in customer cancellations of pending contracts, which could adversely affect the number of Building Solutions concrete projects we have or reduce the prices we can charge for these projects, either of which could result in a decrease in our revenues and earnings that could materially adversely affect our results of operations.

We cannot predict with certainty the overall trajectory of the U.S. housing market or the duration of trends due to changes in conditions that are beyond our control, which may include the following:

- rising interest rates;
- economic downturn or recession;
- shortage of lots available for development;
- changes in demographics and population migration that impair the demand for new housing;
- labor shortages, especially craft labor, and rising costs of labor; and
- changes in the tax laws that reduce the benefits of home ownership.

### We may fail to meet schedule or performance requirements of our contracts.

In most cases, our contracts require completion by a scheduled acceptance date. Failure to timely complete a project could result in additional costs, penalties or liquidated damages being assessed against us, and these could exceed projected profit margins on the contract.

***The design-build project delivery method subjects us to the risk of design errors and omissions.***

We could be liable for a design error or omission that causes or contributes to damages with respect to one of our design-build projects. Although by contract we pass design responsibility on to the engineering firms that we engage to perform design services on our behalf for these projects, in the event of a design error or omission causing damages, there is risk that the engineering firm, its professional liability insurance, and the errors and omissions insurance that they and we purchase will not fully protect us from costs or liabilities. Any liabilities resulting from an asserted design defect with respect to our Transportation Solutions projects may have a material adverse effect on our financial position, results of operations and cash flows. Performance problems on existing and future Transportation Solutions contracts could cause actual results of operations to differ materially from those anticipated by us and could cause us to suffer damage to our reputation within the industry and among our customers.

***An inability to obtain bonding could limit the aggregate dollar amount of contracts that we are able to pursue.***

As is customary in the construction business, we are required to provide bonding to our customers to secure our performance under our contracts. Our ability to obtain bonding primarily depends upon our capitalization, working capital, borrowing capacity under our credit facilities, past performance, management expertise and reputation and certain external factors, including the overall capacity of the credit market. Bonding companies and banks consider such factors in relationship to the amount of our backlog and their underwriting standards, which may change from time to time. Events that adversely affect the financial markets generally may result in bonding becoming more difficult to obtain in the future, or being available only at a significantly greater cost. Our inability to obtain adequate bonding would limit the amount that we can bid on new contracts and could have a material adverse effect on our future revenues and business prospects.

### Timing of the award and performance of new contracts may fluctuate.

It is generally very difficult to predict whether and when new contracts will be offered for tender, as our contracts frequently involve a lengthy and complex design and bidding process, which is affected by a number of factors, such as market conditions, funding arrangements and governmental approvals. Because of these factors, our results of operations and cash flows may fluctuate from quarter to quarter and year to year, and the fluctuation may be substantial.

The uncertainty of the timing of contract awards may also present difficulties in matching the size of our equipment fleet and work crews with contract needs. In some cases, we may maintain and bear the cost of more equipment and ready work crews than are currently required, in anticipation of future needs for existing contracts or expected future contracts. If a contract is delayed or an expected contract award is not received, we would incur costs that could have a material adverse effect on our anticipated profit.

***Adverse weather conditions may cause delays, which could slow completion of our construction activity.***

Because all of our construction projects are performed outdoors, work on our contracts is subject to seasonal weather conditions that may delay our work and contribute to project inefficiency. Lengthy periods of wet or cold winter weather will generally interrupt construction, and this can lead to under-utilization of crews and equipment, resulting in less efficient rates of overhead recovery. Extreme heat or cold can prevent us from performing certain types of operations. For example, during the late fall to the early spring months of each year, our work on construction projects in the Rocky Mountain States has been curtailed at times due to snow and other work-limiting weather. In addition, our work is subject to extreme and unpredictable weather conditions, which could become more frequent or severe if general climatic changes occur. For example, in 2017

Hurricane Harvey caused damage and disruption that resulted in our inability to perform work on all Houston-area contracts for several days and in some cases several weeks, and the 2021 Texas-wide freezing weather event also caused delays for some of our Transportation Solutions and Building Solutions operations. Future evacuations due to hurricanes along the coastal areas can delay our performance of work on contracts for several days or weeks or longer. Future extreme weather events may also limit the availability of resources, increase our costs or cause our projects to be canceled. While revenues can be recovered following a period of bad weather, it is generally impossible to recover the cost of inefficiencies, and significant periods of bad weather typically reduce profitability of affected contracts both in the current period and during the future life of affected contracts. Such reductions in contract profitability negatively affect our results of operations in current and future periods until the affected contracts are completed, and to the extent climate change results in an increase in such extreme adverse weather conditions, the likelihood of a negative impact on our operations may increase.

***We rely on information technology systems to conduct our business, which are subject to disruption, failure or security breaches.***

We rely on information technology (“IT”) systems in order to achieve our business objectives. We also rely upon industry accepted security measures and technology to securely maintain confidential information on our IT systems. However, our portfolio of hardware and software products, solutions and services and our enterprise IT systems may be vulnerable to damage or disruption caused by circumstances beyond our control such as catastrophic events, power outages, natural disasters, computer system or network failures, computer viruses, cyber-attacks or other malicious software programs. The failure or disruption of our IT systems to perform as anticipated for any reason could disrupt our business and result in decreased performance, significant remediation costs, transaction errors, loss of data, processing inefficiencies, downtime, litigation and the loss of suppliers or customers. A significant disruption or failure could have a material adverse effect on our business operations, financial performance and financial condition.

***The COVID-19 pandemic and any future major public health crisis could disrupt the Company’s operations and adversely affect its business, results of operations and financial condition.***

The COVID-19 pandemic, including new and emerging strains and variants, continues to have adverse effects on the U.S. and global economies. This outbreak, which has continued to spread worldwide, has adversely affected workforces, customers, economies and financial markets globally. While the Company has not incurred significant disruptions thus far from the COVID-19 pandemic, the pandemic and any future major public health crisis could impact our business, consolidated results of operations and financial condition in the future. For example, our business and results of operations could be materially adversely affected if significant portions of our workforce are unable to work effectively, including because of illness, quarantines, or government actions or other restrictions in connection with the COVID-19 pandemic or any future major public health crisis. However, the significance of the impact on our operations going forward is not yet certain and depends on numerous evolving factors that the Company may not be able to accurately predict or effectively respond to, including, without limitation: the COVID-19 pandemic or any future major public health crisis, actions taken by governments, businesses and individuals in response, the effect on economic activity and actions taken in response, the effect on customers and their demand for the Company’s products and services, the ability of our subcontractors to perform under their contracts due to their own financial or operational difficulties, the availability of subcontractors and other talent, the speed and effectiveness of responses to combat the COVID-19 virus or any future major public health crisis, including vaccine efficacy, distribution and widespread public acceptance, and the Company’s ability to continue operations, including without limitation as a result of supply chain challenges, facility closures, social distancing, restrictions on travel, fear or anxiety by the populace and shelter-in-place orders.

### Risks Related to Our Subcontractors, Suppliers, Joint Venture Partners and Customers

***Our dependence on subcontractors and suppliers of materials (including petroleum-based products) could increase our costs and impair our ability to complete contracts on a timely basis or at all.***

We rely on third party subcontractors to perform some of the work on many of our projects and third party suppliers to provide substantially all of the materials (including aggregates, cement, asphalt, concrete, steel, oil and fuel) for our contracts. Increasing prices of materials and equipment, including due to inflation, and substantial delays in delivering supplies could adversely impact our operations and construction projects. To the extent that we are unable to engage subcontractors or obtain commitments from our suppliers for materials, our ability to bid for contracts may be impaired. In addition, if a subcontractor or supplier is unable to deliver its services or materials in accordance with the agreed terms for any reason, including the deterioration of its financial condition, we may suffer delays and be required to purchase the services or materials from another source at a higher price or incur other unanticipated costs. This may reduce the profit to be realized, or result in a loss, on a contract.

Diesel fuel and other petroleum-based products are utilized to operate the plants and equipment on which we rely to perform our construction contracts. In addition, our asphalt plants and suppliers use oil in combination with aggregates to produce asphalt used in our road and highway construction projects. Decreased supplies of such products relative to demand, unavailability of petroleum supplies due to refinery turnarounds, higher prices charged for petroleum-based products and other factors can increase the cost of such products. Future increases in the costs of fuel and other petroleum-based products used in our business, particularly if a bid has been submitted for a contract and the costs of such products have been estimated at amounts less than the actual costs thereof, could result in a lower profit, or a loss, on a contract.

***Our participation in joint ventures exposes us to liability and/or harm to our reputation for failures of our partners.***

As part of our business, we are a party to joint venture arrangements, pursuant to which we typically jointly bid on and execute particular projects with other companies in the construction industry. Success on these joint projects depends in part on whether our joint venture partners satisfy their contractual obligations.

We and our joint venture partners are generally jointly and severally liable for all liabilities and obligations of our joint ventures. If a joint venture partner fails to perform or is financially unable to bear its portion of required capital contributions or other obligations, including liabilities stemming from lawsuits, we could be required to make additional investments, provide additional services or pay more than our proportionate share of a liability to make up for our partner’s shortfall. Furthermore, if we are unable to adequately address our partner’s performance issues, the customer may terminate the project, which could result in legal liability to us, harm to our reputation and reduce our profit on a project.

Certain counterparties to joint venture arrangements, which may include our historical direct competitors, may not desire to continue such arrangements with us and may terminate the joint venture arrangements or not enter into new arrangements following a merger or acquisition. Any termination of a joint venture arrangement could cause us to reduce our backlog and could materially and adversely affect our business, results of operations and financial condition.

At December 31, 2021, there was approximately $286.9 million of construction work to be completed on unconsolidated construction joint venture contracts, of which $123.1 million represented our proportionate share. As of December 31, 2021, we are not aware of any situation that would require us to fulfill responsibilities of our joint venture partners pursuant to the joint and several liability under our contracts.

***We may not be able to recover on claims or change orders against clients for payment or on claims against subcontractors for performance.***

We occasionally present claims or change orders to our clients for additional costs exceeding a contract price or for costs not included in the original contract price. Change orders are modifications of an original contract that effectively change the provisions of the contract without adding new provisions. They generally include changes in specifications or design, facilities, equipment, materials, sites and periods for completion of work. Claims are amounts in excess of the agreed contract price (or amounts not included in the original contract price) that we seek to collect for customer-caused delays, errors in specifications and designs, contract terminations or other causes of unanticipated additional costs. These costs may or may not be recovered until the claim is resolved. In addition, we may have claims against subcontractors for performance or non-performance related issues that resulted in additional costs on a project. In some instances, these claims can be the subject of lengthy legal proceedings, and it is difficult to accurately predict when they will be fully resolved. A failure to promptly document and negotiate a recovery for change orders and claims could have a negative impact on our cash flows and overall ability to recover change orders and claims, which would have a negative impact on our financial condition, results of operations and cash flows.

### We are dependent on a limited number of significant customers.

Due to the size and nature of our contracts, one or a few customers have in the past and may in the future represent a substantial portion of our consolidated revenues and gross profits in any one year or over a period of several consecutive years. Similarly, our backlog frequently reflects multiple contracts for certain customers; therefore, one customer may comprise a significant percentage of backlog at a certain point in time. We are unable to predict whether a customer will have a significant downturn in their business or financial condition. The loss of business or a default or delay in payment from any one of these customers could have a material adverse effect on our business, results of operations, cash flows and financial condition.

### Risks Related to Our Workforce

### Our business depends on our ability to attract and retain talented employees.

Our ability to attract and retain reliable, qualified personnel is a significant factor that enables us to successfully bid for and profitably complete our work. This includes management, project managers, estimators, supervisors, foremen, equipment operators and laborers for each of our subsidiaries. The loss of the services of any of our subsidiaries’ management-level personnel could have a material adverse effect on us. Our future success will also depend on our ability to hire and retain, or to attract when needed, highly-skilled personnel. Our business operations may be further impacted by general labor shortages in our industry or markets. If competition for additional employees is intense, we could experience difficulty hiring and retaining the personnel necessary to support our business. If we do not succeed in retaining our current employees and attracting, developing and retaining new highly-skilled employees, our reputation may be harmed and our operations and future earnings may be negatively impacted. Effective succession planning is also important to our long-term success. Failure to ensure effective transfer of knowledge and smooth transitions involving key employees could hinder our strategic planning and execution.

***We may be subject to unionization, work stoppages, slowdowns or increased labor costs.***

In Arizona, California, Hawaii, Maryland, Nevada, New Jersey and New York, a substantial number of our equipment operators and laborers are unionized. Additional groups of our employees may also unionize in the future. If at any time a significant amount of our employees unionized, it could limit the flexibility of the workforce and could result in demands that might increase our operating expenses and adversely affect our profitability. Our inability to negotiate acceptable contracts with unions could result in work stoppages, and any new or extended contracts could result in increased operating costs. Each of our different employee groups could unionize at any time and would require separate collective bargaining agreements. If any group of our employees were to unionize and we were unable to agree on the terms of their collective bargaining agreement or we were to experience widespread employee dissatisfaction, we could be subject to work slowdowns or stoppages. In addition, we may be subject to disruptions by organized labor groups protesting our non-union status. The future or continued occurrence of any of these events would be disruptive to our operations and could have a material adverse effect on our business, operating results and financial condition.

***If we are unable to comply with applicable immigration laws, our ability to successfully complete contracts may be negatively impacted.***

We rely heavily on immigrant labor. We have taken steps that we believe are sufficient and appropriate to ensure compliance with immigration laws. However, we cannot provide assurance that we have identified, or will identify in the future, all undocumented immigrants who work for us. Our failure to identify undocumented immigrants who work for us may result in fines or other penalties being imposed upon us, which could have a material adverse effect on our results of operations and financial condition.

***Our operations are subject to hazards that may cause personal injury or property damage, thereby subjecting us to liabilities and possible losses, which may not be covered by insurance as well as negative reputational impacts relating to health and safety matters.***

Our workers are subject to hazards associated with providing construction and related services on construction sites, plants and quarries. These operating hazards can cause personal injury, loss of life, damage to or destruction of property, plant and equipment, or environmental damage. On most sites, we are responsible for safety and are contractually obligated to implement safety procedures. Our safety record is an important consideration for us and for our customers. If we experience a material increase in the frequency or severity of accidents, our safety record could substantially deteriorate, which may preclude us from bidding on certain work, expose us to potential lawsuits or cause customers to cancel existing contracts.

We maintain general liability and excess liability insurance, workers’ compensation insurance, auto insurance and other types of insurance all in amounts consistent with our risk of loss and industry practice, but this insurance may not be adequate to cover all losses or liabilities that we may incur in our operations. Insurance liabilities are difficult to assess and quantify due to unknown factors, including the severity of an injury, the determination of our liability in proportion to other parties, the number of incidents not reported and the effectiveness of our safety program. If we were to experience insurance claims or costs above our estimates, we might be required to use working capital to satisfy these claims rather than to maintain or expand our operations. To the extent that we experience a material increase in the frequency or severity of accidents or workers’ compensation and health claims, or unfavorable developments on existing claims, our results of operations and financial condition could be materially and adversely affected.

### Risks Related to Regulatory Matters

***Environmental and other regulatory matters, including those relating to climate change, could adversely affect our ability to conduct our business and could require expenditures that could have a material adverse effect on our results of operations and financial condition.***

Our operations are subject to various environmental laws and regulations relating to the management, disposal and remediation of hazardous substances and the emission and discharge of pollutants into the air and water. We could be held liable for such contamination created not only from our own activities but also from the historical activities of others on our project sites or on properties that we acquire or lease. Our operations are also subject to laws and regulations relating to workplace safety and worker health, which, among other things, regulate employee exposure to hazardous substances. Violations of such laws and regulations could subject us to substantial fines and penalties, cleanup costs, third party property damage or personal injury claims. In addition, growing concerns about climate change and other environmental issues could result in the imposition of additional environmental regulations. Such legislation or restrictions could increase the costs of projects for us and our clients or, in some cases, prevent a project from going forward, thereby potentially reducing the need for our services which could in turn have a material adverse effect on our operations and financial condition. Generally, environmental laws and regulations have become, and enforcement practices and compliance standards are becoming, increasingly stringent. Moreover, we cannot predict the nature, scope or effect of legislation or regulatory requirements that could be imposed, or how existing or future laws or regulations will be administered or interpreted, with respect to products or activities to which they have not been previously applied. Compliance with more stringent laws or regulations, as well as more vigorous enforcement policies of the regulatory agencies, could increase our compliance costs. Compliance with new regulations could require us to make substantial expenditures for, among other things, pollution control systems and other equipment that we do not currently possess, or the acquisition or modification of permits applicable to our activities.

Our aggregate quarry leases in Utah and Nevada could subject us to costs and liabilities. As lessee and operator of the quarries, we could be held responsible for any contamination or regulatory violations resulting from activities or operations at the quarries. Any such costs and liabilities could be significant and could materially and adversely affect our business, operating results and financial condition.

***Recent and potential changes in U.S. trade policies and retaliatory responses from other countries may significantly increase the costs or limit supplies of materials and products used in our construction projects involving concrete.***

In the recent past, the federal government imposed new or increased tariffs or duties on an array of imported materials and goods used in connection with our construction business, including steel and lumber, which raised our costs for these items (or products made with them). Foreign governments, including China and Canada, and trading blocs, such as the European Union, have responded by imposing or increasing tariffs, duties and/or trade restrictions on U.S. goods, and are reportedly considering other measures. Any trading conflicts and related escalating governmental actions that result in additional tariffs, duties and/or trade restrictions could increase our costs further, cause disruptions or shortages in our supply chains and/or negatively impact the U.S., regional or local economies, and, individually or in the aggregate, materially and adversely affect our business and result of operations.

### Risks Related to Our Transportation Solutions Business

***Our Transportation Solutions business relies on highly competitive and highly regulated state or local government contracts.***

State and local government funding for public works projects is limited, thus creating a highly competitive environment for the limited number of public projects available. In addition, state and local government contracts are subject to specific procurement regulations, contract provisions and a variety of regulatory requirements relating to their formation, administration, performance and accounting. Many of these contracts include express or implied certifications of compliance with applicable laws and contract provisions. As a result, any violations of these regulations could bring about litigation and could cause termination of other existing state or local government contracts and result in the loss of future state or local government contracts. Due to the significant competition in the marketplace and the level of regulations on state or local government contracts, we could suffer reductions in new projects and see lower revenues and profit margins on those projects, which could have a material adverse effect on the business, operating results and financial condition.

***Our Transportation Solutions business depends on our ability to qualify as an eligible bidder under state or local government contract criteria and to compete successfully against other qualified bidders in order to obtain state or local government contracts.***

State and local government agencies conduct rigorous competitive processes for awarding many contracts. Some contracts include multiple award task order contracts in which several contractors are selected as eligible bidders for future work. We will potentially face strong competition and pricing pressures for any additional Transportation Solutions contract awards from other government agencies, and we may be required to qualify or continue to qualify under various multiple award task order contract criteria. Our inability to qualify as an eligible bidder under state or local government contract criteria could preclude us from competing for certain other government contract awards. In addition, our inability to qualify as an eligible bidder, or to compete successfully when bidding for certain state or local government contracts and to win those Transportation Solutions contracts, could materially adversely affect our business, operations, revenues and profits.

***Our Transportation Solutions business is susceptible to economic downturns and reductions in state or local government funding of infrastructure projects.***

Our business is highly dependent on the amount and timing of infrastructure work funded by various governmental entities, which, in turn, depend on the overall condition of the economy, the need for new or replacement infrastructure, the priorities placed on various projects funded by governmental entities and federal, state or local government spending levels. Spending on infrastructure could decline for numerous reasons, including decreased revenues received by state and local governments for spending on such projects. For example, state spending on highway and other projects can be adversely affected by decreases or delays in, or uncertainties regarding, federal highway funding, which could adversely affect us since we are reliant upon contracts with state transportation departments for a significant portion of our revenues.

Refer to our “Business—Segments, Markets and Customers” section within Item 1 for a more detailed discussion of our geographic markets, and refer to Item 7 “Management’s Discussion and Analysis of Financial Condition and Results of Operations—Market Outlook and Trends” for a discussion of our current expectations regarding federal spending.

***A prolonged government shutdown may adversely affect our Transportation Solutions business.***

We derive a significant portion of our Transportation Solutions revenue from governmental agencies and programs. A prolonged government shutdown could impact inspections, regulatory review and certifications, grants, approvals, or cause other situations that could result in our incurring substantial labor or other costs without reimbursement under government contracts, or the delay or cancellation of key government programs in which we are involved, all of which could have a material adverse effect on our business and results of operations.

### Risks Related to Recent Acquisitions and Strategy

### We expect to continue to incur expenses related to the Petillo Acquisition.

We have incurred expenses in connection with completing the Petillo Acquisition on December 30, 2021, and we expect to continue to incur expenses in connection with integrating our business, operations, networks, systems, technologies, policies and procedures with those of Petillo. While we have assumed that a certain level of transaction and integration expenses will be incurred, there are a number of factors beyond our control that could affect the total amount and the timing of our integration expenses.

***We may be unable to successfully integrate Petillo’s business with ours and realize the anticipated benefits of the Petillo Acquisition.***

The Petillo Acquisition previously operated as a private enterprise, whereas we are a public company. We will be required to devote management attention and resources to integrating the business practices and operations of Petillo with the Company. Potential difficulties we may encounter in the integration process include the following:

- lost sales and customers as a result of certain customers of the Company or Petillo deciding to terminate or reduce their business with the Company or Petillo following the Petillo Acquisition;
- the complexities of combining multiple companies with different histories, regulatory restrictions, operating structures and markets, including geographic location and operating geography;
- the failure to retain key employees of the Company or Petillo;
- potential unknown liabilities and unforeseen increased expenses associated with the Petillo Acquisition; and
- performance shortfalls at the Company or Petillo as a result of the diversion of management’s attention caused by integrating the companies’ operations.

For all these reasons, it is possible that the integration process could result in the distraction of management, the disruption of our ongoing business or inconsistencies in our products, services, standards, controls, procedures and policies, any of which could adversely affect the ability of the Company to maintain relationships with customers, vendors and employees or to achieve the anticipated benefits of the Petillo Acquisition, or could otherwise adversely affect our business and financial results.

### We may be unable to retain key employees.

Our success following the Petillo Acquisition will depend in part upon our ability to retain key employees of the Company and Petillo. Key employees may depart because of issues relating to uncertainty, changes in workplace responsibilities or demands, or difficulty of integration. Accordingly, we may be unable to retain key employees to the same extent as in the past.

***Our strategy, which includes expanding into adjacent markets, may not be successful.***

We may pursue growth through the acquisition of companies or assets that will enable us to broaden the types of projects we execute and also expand into new markets. We have completed several acquisitions and plan to consider strategic acquisitions in the future. We may be unable to implement this growth strategy if we cannot identify suitable companies or assets or reach agreement on potential strategic acquisitions on acceptable terms. Moreover, an acquisition involves certain risks, including:

- difficulties in the integration of operations, systems, policies and procedures;
- enhancements in controls and procedures including those necessary for a public company may make it more difficult to integrate operations and systems;
- failure to implement proper overall business controls, including those required to support our growth, resulting in inconsistent operating and financial practices at companies we acquire or have acquired;
- termination of relationships with the key personnel and customers of an acquired company;
- additional financial and accounting challenges and complexities in areas such as tax planning, treasury management, financial reporting and internal controls;
- the incurrence of environmental and other liabilities, including liabilities arising from the operation of an acquired business or asset prior to our acquisition for which we are not indemnified or for which the indemnity is inadequate;
- disruption of, or receipt of, insufficient management attention to our ongoing business; and
- inability to realize the cost savings or other financial benefits that we anticipate.

### Risks Related to Our Financial Results, Financing and Liquidity

***Our use of over time revenue recognition (formally known as percentage-of-completion method) accounting related to our projects could result in a reduction or elimination of previously reported revenue and profits.***

As is more fully discussed in Item 7 “Management’s Discussion and Analysis of Financial Condition and Results of Operations–Critical Accounting Estimates,” we recognize contract revenue over time. This method is used because management considers the cost-to-cost measure of progress to be the best measure of progress on these contracts.

Under this method, estimated contract revenue is recognized by applying the cost-to-cost measure of progress for the period (based on the ratio of costs incurred to total estimated costs of a contract) to the total estimated revenue for the contract. Contract estimates are based on various assumptions to project the outcome of future events that often span several years. These assumptions include labor productivity and availability, the complexity of the work to be performed, the cost and availability of materials and the performance of subcontractors. Changes in job performance, job conditions and estimated profitability, including those changes arising from contract penalty provisions and final contract settlements, may result in revisions to costs and income and are recognized in the period in which the revisions are determined. These adjustments could result in both increases and decreases in profit margins or losses. Actual results could differ from estimated amounts and could result in a reduction or elimination of previously recognized earnings. In certain circumstances, it is possible that such adjustments could be significant and could have an adverse effect on our business. To the extent that these adjustments result in an increase, a reduction or an elimination of previously reported contract profit, we recognize a credit or a charge against current earnings, which could be material.

### We may not be able to fully realize the revenue value reported in our Backlog.

Backlog as of December 31, 2021 totaled $1.49 billion. Backlog develops as a result of new awards, which represent the potential revenue value realizable pursuant to new project commitments received by us during a given period. Backlog is measured and defined differently by companies within our industry. We refer to “Backlog” as the unearned revenue we expect to earn in future periods on our executed contracts. As the construction on our projects progresses, we increase or decrease Backlog to take into account newly signed contracts, revenue earned during the period and our estimates of the effects of changes in estimated quantities, changed conditions, change orders and other variations from previously anticipated contract revenues, including completion penalties and incentives. We cannot guarantee that the revenue projected in our Backlog will be realized, or if realized, will result in earnings.

Given these factors, our Backlog at any point in time may not accurately represent the revenue that we expect to realize during any period, and our Backlog as of the end of a fiscal year may not be indicative of the revenue we expect to earn in the following fiscal year. Inability to realize revenue from our Backlog could have an adverse effect on our business.

***We may need to raise additional capital in the future for working capital, capital expenditures and/or acquisitions, and we may not be able to do so on favorable terms or at all, which would impair our ability to operate our business or achieve our growth objectives.***

Our ability to obtain additional financing in the future will depend in part upon prevailing credit and equity market conditions, as well as the condition of our business and our operating results; such factors may adversely affect our efforts to arrange additional financing on terms satisfactory to us and makes us more vulnerable to adverse economic and competitive conditions.

We have pledged substantially all of our assets as collateral in connection with our Credit Agreement and we have additionally pledged the proceeds of and other rights under our Transportation Solutions and E-Infrastructure Solutions contracts to our bonding agent. As a result, we may have difficulty in obtaining additional financing in the future if such financing requires us to pledge assets as collateral. In addition, under our Credit Agreement, we must obtain the consent of our lenders to incur additional debt from other sources (subject to certain limited exceptions).

If adequate funds are not available, or are not available on acceptable terms, we may not be able to make future investments, take advantage of acquisitions or other opportunities, or respond to competitive challenges.

***In connection with the Petillo Acquisition, we incurred a substantial amount of additional indebtedness, and the agreement governing such indebtedness contains various covenants and other provisions that impose restrictions on our ability to operate and manage our business.***

As a result of borrowing additional funds for the Petillo Acquisition, we have a higher level of indebtedness; specifically, as of December 31, 2021, our aggregate principal amount outstanding under our credit facility (“Credit Facility”) was $446.9 million. The Credit Facility will mature on October 2, 2024. While we currently believe we will have the financial resources to meet or refinance our obligations when they come due, we cannot fully anticipate our future performance or financial condition, the future condition of the credit markets or the economy generally.

The Credit Agreement governing the additional indebtedness incurred by us in connection with the Petillo Acquisition contains certain subsidiary guarantees, which are secured by a first priority security interest in substantially all assets directly owned by such subsidiaries and us, subject to certain exceptions and limitations. The Credit Agreement contains various affirmative and negative covenants that may, subject to certain exceptions, restrict the ability of us and our subsidiaries to, among other things, grant liens, incur additional indebtedness, make loans, advances or other investments, make non-ordinary course asset sales, declare or pay dividends or make other distributions with respect to equity interests, purchase, redeem or otherwise acquire or retire capital stock or other equity interests, or merge or consolidate with any other person, among various other things.

In addition, the Credit Agreement contains financial covenants that require us and certain of our subsidiaries to maintain certain financial ratios and to prepay outstanding loans under the Credit Agreement in certain cases with proceeds from the issuance of additional debt, asset dispositions, events of loss and excess cash flows. These requirements could limit our cash flow or impair our ability to conduct business and pursue business strategies, which could have a material adverse effect on our results of operations, cash flows or financial condition. The ability of us and our subsidiaries to comply with these provisions may be affected by events beyond our and their control. Failure to comply with these covenants could result in an event of default, which, if not cured or waived, could accelerate our debt repayment obligations, which in turn may trigger cross-acceleration or cross-default provisions in other debt or bonding agreements. The Credit Agreement also contains a cross-default provision. This provision could have a wider impact on liquidity than might otherwise arise from a default of a single debt instrument. Our available cash and liquidity would not be sufficient to fully repay borrowings under all of our debt instruments that could be accelerated upon such an event of default.

Further, our level of indebtedness could have important other consequences to our business, including the following:

- limiting our flexibility in planning for, or reacting to, changes in the industry in which we operate;
- increasing our vulnerability to general adverse economic and industry conditions;
- limiting our ability to fund future working capital and capital expenditures because of the need to dedicate a substantial portion of our cash flows from operations to payments on our debt service;
- placing us at a competitive disadvantage compared to our competitors that have less debt;
- limiting our ability to borrow additional funds or refinance existing debt; or
- requiring that we pledge substantial collateral, which may limit flexibility in operating our business and restrict our ability to sell assets.

We may elect to borrow, continue or convert certain term or revolving loans under our Credit Agreement to bear interest at an annual rate of one-, two-, three-, six- or, if available, twelve-month London Interbank Offered Rate (“LIBOR”), plus 2.5% per annum. Accordingly, increases in interest rates could have a material adverse effect on our business operations, financial performance and financial condition.

While our Credit Agreement contains “benchmark” transition language to address the phase out of LIBOR that began with the initial phase of the non-publication of LIBOR data in December 2021, LIBOR and other interest rates and other types of indices which are deemed to be financing “benchmarks” are the subject of ongoing international regulatory reform. Any changes announced by regulators or any other governance or oversight body, or future changes adopted thereby, regarding the continuing use or method of determining LIBOR rates may impact our interest costs. Although our Credit Agreement provides for alternative methods of calculating the interest rate payable on such indebtedness if LIBOR is not reported, we may be required to amend our Credit Agreement to incorporate alternative benchmark rates. Further, uncertainty as to the extent and manner of future changes regarding an alternative rate or benchmark may adversely affect the value of our variable rate indebtedness or increase our cost of debt.

***To service our indebtedness and to fund working capital, we will require a significant amount of cash. Our ability to generate cash depends on many factors that are beyond our control, including the fact that adverse capital and credit market conditions may affect our ability to meet liquidity needs, access to capital and cost of capital.***

Our ability to generate cash, outside of funds available through our revolving credit facility (“Revolving Credit Facility”), is subject to our operational performance, as well as general economic, financial, competitive, legislative, regulatory and other factors that are beyond our control. We may be unable to expand our credit capacity, which could adversely affect our operations and business. Earnings from our operations and our working capital requirements can vary from period to period based primarily on the mix of our projects underway and the percentage of project work completed during the period. Capital expenditures may also vary significantly from period to period. We cannot provide assurance that our business will generate sufficient cash flow from operations or asset sales or that we can obtain future borrowing capacity in an amount sufficient to enable us to pay our indebtedness, to fund working capital requirements or to fund our other liquidity needs. Without sufficient liquidity, we will be forced to curtail our operations, and our business will suffer.

In the event we cannot generate enough cash to satisfy our liquidity needs, we may have to seek additional financing. The Credit Agreement, subject to certain exceptions, restricts our ability to incur additional financing indebtedness. The availability of additional financing will depend on a variety of factors such as market conditions, the general availability of credit, the volume of trading activities, our credit ratings and credit capacity, as well as the possibility that customers or lenders could develop a negative perception of our long- or short-term financial prospects if the level of our business activity decreased due to a market downturn. The domestic and worldwide capital and credit markets may experience significant volatility, disruptions and dislocations with respect to price and credit availability. Should we need additional funds or to refinance our existing indebtedness, we may not be able to obtain such additional funds. If internal sources of liquidity prove to be insufficient, we may not be able to successfully obtain additional financing on favorable terms, or at all.

We may need to refinance all or a portion of our indebtedness on or before maturity. We cannot provide assurance that we will be able to refinance any of our indebtedness on commercially reasonable terms or at all. Our inability to refinance our debt on commercially reasonable terms also could have a material adverse effect on our business. If we experience operational difficulties, we may need to increase our available borrowing capacity or seek amendments to the terms of our Credit Agreement. There can be no assurance that we will be able to secure any additional capacity or amendment to our Credit Agreement or to do so on terms that are acceptable to us, in which case, our costs of borrowing could rise and our business and results of operations could be materially adversely affected.

### We must manage our liquidity carefully to fund our working capital.

The need for working capital for our business varies due to fluctuations in the following amounts, among other factors:

- receivables;
- contract retentions;
- contract assets;
- contract liabilities;
- the size and status of contract mobilization payments and progress billings; and
- the amounts owed to suppliers and subcontractors.

We may have limited cash on hand and the timing of payments on our contract receivables is difficult to predict. If the timing of payments on our receivables is delayed or the amount of such payments is less than expected, our liquidity and ability to fund working capital could be materially and adversely affected.

### We may be required to write down all or part of our goodwill and intangibles.

We had approximately $259.8 million of goodwill and $303.2 million of intangibles recorded on our Consolidated Balance Sheet at December 31, 2021. Goodwill represents the excess of cost over the fair value of net assets acquired in business combinations reduced by any impairments recorded subsequent to the date of acquisition. Intangible assets are recognized as an asset apart from goodwill if it arises from contractual or other legal rights or if it is separable; that is, it is capable of being separated or divided from the acquired business and sold, transferred, licensed, rented or exchanged (whether there is intent to do so). A shortfall in our revenues or net income or changes in various other factors from that expected by securities analysts and investors could significantly reduce the market price of our common stock. If our market capitalization drops significantly below the amount of net equity recorded on our balance sheet, it might indicate a decline in our fair value and would require us to further evaluate whether our goodwill or intangible assets have been impaired. We perform an annual test of our goodwill and periodic assessments of intangible assets to determine if they have become impaired. On an interim basis, we also review the factors that have or may affect our operations or market capitalization for events that may trigger impairment testing. Write downs of goodwill and intangible assets may be substantial. If we were required to write down all or a significant part of our goodwill and/or intangible assets in future periods, our net earnings and equity could be materially adversely affected.

***Failure to maintain adequate financial and management processes and internal controls could lead to errors in reporting our financial results.***

The accuracy of our financial reporting is dependent on the effectiveness of our internal controls. We are required to provide a report from management to our shareholders on our internal control over financial reporting that includes an assessment of the effectiveness of these controls. Internal control over financial reporting has inherent limitations, including human error, the possibility that controls could be circumvented or become inadequate because of changed conditions, resource challenges and fraud. Because of these inherent limitations, internal control over financial reporting might not prevent or detect all misstatements or fraud. If we fail to maintain the adequacy of our internal controls, including any failure to implement required new or improved controls, otherwise fail to prevent financial reporting misstatements, or if we experience difficulties in implementing internal controls, our business and operating results could be harmed, and we could fail to meet our financial reporting obligations. Please refer to Item 9A of this annual report on Form 10-K for further information.

## Properties

As filed, 1,565 characters.

We own or lease properties in locations throughout the U.S. to conduct our business. We believe these facilities are adequate to meet our current and near-term requirements. The following list summarizes our principal properties by segment for which they are primarily utilized and our “Corporate” headquarters:

| Location | Type of Facility | Interest | Segment(s) |
| --- | --- | --- | --- |
| The Woodlands, TX | Administrative | Leased | Corporate |
| Austell, GA | Administrative, operations and equipment yard | Owned/Leased | E-Infrastructure Solutions |
| Flanders, NJ | Administrative, operations and equipment yard | Leased | E-Infrastructure Solutions |
| Denton, TX | Administrative and operations | Owned | Building Solutions |
| Draper, UT (1) | Administrative and operations | Leased | Building Solutions and Transportation Solutions |
| Phoenix, AZ | Administrative and operations | Leased | Transportation Solutions |
| Houston, TX | Administrative, operations and equipment yard | Owned | Transportation Solutions |
| Sacramento, CA | Administrative, operations and equipment yard | Owned/Leased | Transportation Solutions |
| Sparks, NV | Administrative and operations | Owned/Leased | Transportation Solutions |
| (1) The leased office space in Draper, UT is owned by companies which are principally owned by a related party. Refer to Note 20 - Related Party Transactions for additional information. |  |  |  |

All of our wholly-owned assets are encumbered, see *Note 9 - Debt* for further discussion on debt and our current credit agreements.

## Legal proceedings

As filed, 703 characters.

The Company, including its construction joint ventures and its consolidated 50% owned subsidiaries, is now and may in the future be involved as a party to various legal proceedings that are incidental to the ordinary course of business. The Company regularly analyzes current information about these proceedings and, as necessary, provides accruals for probable liabilities on the eventual disposition of these matters.

In the opinion of management, after consultation with legal counsel, there are currently no threatened or pending legal matters that would reasonably be expected to have a material adverse impact on the Company’s Consolidated Results of Operations, Financial Position or Cash Flows.

## Management's discussion and analysis

As filed, 39,137 characters.

The following “Management’s Discussion and Analysis of Financial Condition and Results of Operations” is provided to assist readers in understanding our financial performance during the periods presented and significant trends that may impact our future performance. This discussion should be read in conjunction with our Consolidated Financial Statements and the related notes thereto.

### OVERVIEW

*General—*Sterling Construction Company, Inc. operates through a variety of subsidiaries within three segments specializing in Transportation, E-Infrastructure and Building Solutions in the United States (the “U.S.”), primarily across the Southern, Northeastern and Mid-Atlantic U.S., the Rocky Mountain States, California and Hawaii, as well as other areas with strategic construction opportunities. Transportation Solutions includes infrastructure and rehabilitation projects for highways, roads, bridges, airports, ports, light rail, water, wastewater and storm drainage systems. E-Infrastructure Solutions projects develop advanced, large-scale site development systems and services for data centers, e-commerce distribution centers, warehousing, transportation, energy and more. Building Solutions projects include residential and commercial concrete foundations for single-family and multi-family homes, parking structures, elevated slabs and other concrete work. From strategy to operations, we are committed to sustainability by operating responsibly to safeguard and improve society’s quality of life. Caring for our people and our communities, our customers and our investors – that is The Sterling Way.

*Petillo Acquisition—*On December 30, 2021, we completed our acquisition of Petillo for aggregate consideration of $204.6 million. Petillo is a leading specialty site development contractor based in Flanders, New Jersey and serves the Northeastern and Mid-Atlantic States, providing large-scale site infrastructure improvement services, including full-service excavation, underground utility construction, environmental remediation, drainage systems for commercial construction and water management and distribution systems. The results of Petillo are included within our E-Infrastructure Solutions segment. See *Note 3 - Acquisitions* for further discussion.

*Kimes Acquisition—*On December 28, 2021, we completed our acquisition of Kimes & Stone (“Kimes”) for an all-cash purchase price of $7.6 million. Kimes provides a diversified services offering of soil stabilization for site development on e-commerce projects such as large fulfillment and distribution centers and data centers, as well as soil stabilization for roadways and manufacturing plant construction. The transaction includes a fleet of soil stabilization equipment and working capital. The results of Kimes are included within Plateau which is included within our E-Infrastructure Solutions segment.

*Impact of COVID-19—*The Company continues to monitor closely the actual and expected impacts of the COVID-19 pandemic on our business, financial condition and results of operations. To date, we have not experienced significant shutdowns of project sites or operational interruptions. While the Company has not incurred significant disruptions thus far from the COVID-19 pandemic, the pandemic may impact our business, condensed consolidated results of operations and financial condition in the future. The significance of impacts on our operations going forward is not yet certain and depends on numerous evolving factors as discussed further in Part I, Item 1A “Risk Factors” in this annual report on Form 10-K.

### MARKET OUTLOOK AND TRENDS

The market outlook and trends currently reflect favorable opportunities for long-term growth despite the challenging market pressures that include inflation, supply chain issues and labor challenges. To remain competitive in the current market environments, Sterling remains focused on our strategic business elements and objectives as outlined. We continue to shift our focus from low-bid heavy highway, that now represents approximately 19% of our total revenue, and increasing margins in our E-Infrastructure and Building Solutions segments.

*Transportation Solutions—*Sterling’s Transportation Solutions business is primarily driven by federal, state and municipal funding. Federal funds, on average, provide 50% of annual State Department of Transportation capital outlays for highway and bridge projects. In October 2018, the Federal Aviation Administration reauthorized $3.35 billion annually through 2023. This reauthorization also includes more than $1 billion a year for airport infrastructure grants and about $1.7 billion for disaster relief. In November 2020, various state and local transportation measures were passed securing, and in some cases increasing, funding of major initiatives in Texas ($7.5 billion) and California ($520 million). On November 5, 2021 Congress passed the Infrastructure Investments and Jobs Act (“IIJA”) that provided a new five-year reauthorization of highway and public transportation programs with historic investment increases of $284 billion for all modes of transportation. With the passing of the IIJA, additional funding is reserved for transportation infrastructure with $110 billion reserved for roads and bridges, $66 billion for rail and $25 billion for airports. This bill could add additional multi-year funding for highways, rail and airports starting in 2022, however current changes for funding allocation may cause project start delays. Even though several of the states in Sterling’s key markets have instituted actions to further increase annual spending, shorter project cycles and continued fluctuations in pricing are causing delays in project awards.

*E-Infrastructure Solutions—*Sterling’s E-Infrastructure Solutions business is primarily driven by investments in the development of data centers, e-commerce distribution centers and warehouses. The continued revenue growth of the Company’s complex site development business is directly related to the continued implementation of publicly announced multi-year capital infrastructure campaigns from end users, including Amazon, Facebook and Home Depot. In our growing East Coast market, project activity includes data centers, new warehouse and industrial development. Within this market, the warehouse availability rate is at 3.6%, despite over 16.7 million square feet of new building deliveries in 2021. Additionally, the market experienced over 11.8 million square feet of absorption during Q4, bringing 2021 total absorption to 34.5 million square feet, more than any other year on record. Equipment availability, material delays and fuel price increases continue to be challenging factors. With the forecasted increases expected in land prices, the customer trends show projects for full site development versus staged site development. The trend for full site development is expected to continue in 2022.

*Building Solutions—*Our Building Solutions segment is comprised of our residential and commercial businesses. The continued revenue growth of our residential business is directly related to the growth of new home starts in its key market of Dallas-Fort Worth, the continued expansion in the Houston market, and the mid-2021 entry into the Phoenix market. Residential’s core customer base is primarily made up of leading national home builders as well as regional and custom home builders. Over the last several quarters, the residential market has experienced significant price volatility and availability for key materials including concrete, steel and lumber, as well as increases in subcontractor labor cost. While the Company has worked with customers to pass on the increases in material and labor cost, the Company may not be successful in recouping these additional costs in the future. For our commercial business, the outlook for the multi-family market continues to decline, as developers face economic concerns due to the COVID-19 pandemic and the availability and affordability of starter single family homes continues to rise.

### BACKLOG

Our backlog (“Backlog”) of construction projects is the remaining amount of contracts that we expect to recognize as revenue in future periods. The contracts in Backlog are typically completed in 6 to 36 months. Our unsigned low-bid awards (“Unsigned Low-bid Awards”) are excluded from Backlog until the contract is executed by our customer. We refer to the combination of our Backlog and Unsigned Low-bid Awards as “Combined Backlog.” Our book-to-burn ratio, a non-GAAP measure, is determined by taking our additions to Backlog and dividing it by revenue for the applicable period. This metric allows management to monitor the Company’s business development efforts to ensure we grow our Backlog and our business over time, and management believes that this measure is useful to investors for the same reason.

At December 31, 2021, our Backlog was $1.49 billion, as compared to $1.18 billion at December 31, 2020, with a book-to-burn ratio of 1.23 for the year ended December 31, 2021. Backlog includes $123.1 million and $234.2 million attributable to our share of estimated revenues related to joint ventures where we are a noncontrolling joint venture partner at December 31, 2021 and 2020, respectively. At December 31, 2021, backlog also includes $210.6 million related to the newly acquired Petillo business. We anticipate that approximately 63% of our Backlog will be recognized as revenues during 2022, with substantially all remaining recognized in the twelve months following.

Unsigned Low-bid Awards were $22.5 million at December 31, 2021 and $356.9 million at December 31, 2020. Combined Backlog totaled $1.52 billion at December 31, 2021 and $1.53 billion at December 31, 2020, with a book-to-burn ratio of 0.99 for the year ended December 31, 2021.

The Company’s margin in Backlog has increased from 12.0% at December 31, 2020 to 12.2% at December 31, 2021 and the Combined Backlog margin increased from 11.8% at December 31, 2020 to 12.2% at December 31, 2021, driven by a greater mix of E-Infrastructure Solutions awards and a shift in backlog from low-bid to design build heavy highway work.

Backlog and gross margin:

*(In thousands)*

|  | Backlog | Gross Margin in Backlog |
| --- | ---: | ---: |
| Fourth quarter of 2021 | $1,493,115 | 12.2% |
| Third quarter of 2021 | $1,411,347 | 12.3% |
| Second quarter of 2021 | $1,570,641 | 12.4% |
| First quarter of 2021 | $1,639,222 | 11.8% |
| Fourth quarter of 2020 | $1,175,388 | 12.0% |

24

### RESULTS OF OPERATIONS

### Consolidated Results

*Summary—*For 2021, the Company had operating income of $107.3 million, income before income taxes of $90.0 million, net income attributable to Sterling common stockholders of $62.6 million and net income per diluted share attributable to Sterling common stockholders of $2.15.

Consolidated financial highlights for 2021 as compared to 2020 are as follows:

*(In thousands)*

|  | Years Ended December 31, 2021 | 2020 |
| --- | ---: | ---: |
| Revenues | $1,581,766 | $1,427,412 |
| Gross profit | 214,757 | 191,369 |
| General and administrative expenses | (78,506) | (71,415) |
| Intangible asset amortization | (11,464) | (11,436) |
| Acquisition related costs | (3,877) | (1,026) |
| Other operating expense, net | (13,623) | (12,600) |
| Operating income | 107,287 | 94,892 |
| Interest, net | (19,296) | (29,216) |
| Gain (loss) on extinguishment of debt | 2,032 | (301) |
| Income before income taxes and noncontrolling interests | 90,023 | 65,375 |
| Income tax expense | (24,900) | (22,471) |
| Less: Net income attributable to noncontrolling interests | (2,478) | (598) |
| Net income attributable to Sterling common stockholders | $62,645 | $42,306 |
| Gross margin | 13.6% | 13.4% |

*Revenues—*Revenues were $1.58 billion for 2021, an increase of $154.4 million or 10.8% compared to the prior year. The increase was driven by a $71.5 million increase in E-Infrastructure Solutions, a $41.8 million increase in Transportation Solutions and a $41.1 million increase in Building Solutions.

*Gross profit—*Gross profit was $214.8 million for 2021, an increase of $23.4 million or 12.2% compared to the prior year. The Company’s gross margin increased to 13.6% in 2021, as compared to 13.4% in the prior year, driven by higher volume and the ramp up of construction on large design-build joint venture projects as we continued to reduce the lower margin low-bid heavy highway revenues for Transportation Solutions.

Contracts in progress which were not substantially complete totaled approximately 200 at both December 31, 2021 and 2020. These contracts are of various sizes, of different expected profitability and in various stages of completion. The nearer a contract progresses toward completion, the more visibility the Company has in refining its estimate of total revenues (including incentives, delay penalties and change orders), costs and gross profit. Thus, gross profit as a percent of revenues can increase or decrease from comparable and subsequent quarters due to variations among contracts and depending upon the stage of completion of contracts.

*General and administrative expenses—*General and administrative expenses were $78.5 million, or 5.0% of revenue, for 2021, compared to $71.4 million, or 5.0% of revenue, in the prior year. The increase is primarily due to higher employee and insurance related costs.

*Acquisition related costs—*The Company had acquisition related costs of $3.9 million and $1.0 million in the years ended 2021 and 2020, respectively. These costs relate primarily to the acquisition of Petillo in 2021 and completing the integration of Plateau in 2020.

*Other operating expense, net—*Other operating expense, net, includes 50% of earnings and losses related to members’ interest of consolidated 50% owned subsidiaries, earn-out expense and other miscellaneous operating income or expense. Members’ interest earnings are treated as an expense and increase the liability account. The change in other operating expense, net, was an increase of $1.0 million during 2021 compared to the prior year. Members’ interest earnings increased by $2.0 million during 2021 to $13.1 million from $11.1 million in the prior year, as a result of improved margin mix from our 50% owned subsidiaries. Earn-out expense decreased by $1.0 million during 2021 to $0.5 million from $1.5 million in the prior year as the result of the end of the earn-out period in the second quarter of 2021.

*Interest expense—*Interest expense was $19.3 million in 2021 compared to $29.4 million in the prior year. The decrease is in part due to a 2% lower applicable interest rate provided under the amended Credit Agreement (as defined below), which was amended in the second quarter of 2021, and in part due to the Company’s declining original Term Loan Facility (as defined below) balance, as the Company has paid down $48.1 million of the balance in 2021.

*Income taxes—*The effective income tax rate was 27.7% in 2021 and 34.4% in the prior year. The decrease is primarily due to reduction in state income taxes and other permanent differences. Due to its net operating loss carryforwards, the Company had no cash payments for federal income taxes in 2021 or 2020. The Company makes cash payments for state income taxes in states in which the Company does not have net operating loss carryforwards. See *Note 13 - Income Taxes* for more information.

### Segment Results

With the December 30, 2021 acquisition of Petillo, the Company realigned its operating groups to reflect management’s present oversight of operations. After realignment, the Company’s operations consist of three reportable segments: Transportation Solutions, E-Infrastructure Solutions and Building Solutions, with the commercial business reclassified from the previously reported Specialty Services operating group into the newly formed Building Solutions operating group. We incur expenses at the corporate level that relate to our business as a whole. Certain of these amounts have been charged to our business segments by various methods, largely on the basis of usage, with the unallocated remainder reported in the “Corporate” line. The segment information for the prior periods has been recast to conform to the current presentation.

*(In thousands)*

| Revenues | Years Ended December 31, 2021 | % of Revenues | 2020 | % of Revenues |
| --- | ---: | ---: | ---: | ---: |
| Transportation Solutions | $795,582 | 50% | $753,824 | 53% |
| E-Infrastructure Solutions | 468,784 | 30% | 397,253 | 28% |
| Building Solutions | 317,400 | 20% | 276,335 | 19% |
| Total Revenues | $1,581,766 |  | $1,427,412 |  |
| **Operating Income** |  |  |  |  |
| Transportation Solutions | $21,514 | 2.7% | $14,439 | 1.9% |
| E-Infrastructure Solutions | 80,478 | 17.2% | 76,522 | 19.3% |
| Building Solutions | 32,564 | 10.3% | 30,441 | 11.0% |
| Segment Operating Income | 134,556 | 8.5% | 121,402 | 8.5% |
| Corporate | (23,392) |  | (25,484) |  |
| Acquisition related costs | (3,877) |  | (1,026) |  |
| Total Operating Income | $107,287 | 6.8% | $94,892 | 6.6% |

#### Transportation Solutions

*Revenues—*Revenues were $795.6 million for 2021, an increase of $41.8 million or 5.5%, compared to the prior year. The increase was driven by higher heavy highway and aviation revenue, partly offset by lower water containment and treatment revenue. The increase in heavy highway revenue was primarily due to the ramp up of construction on large design-build joint venture projects. During 2021, our low-bid heavy highway revenue decreased by $79.8 million, which was offset by an increase of $126.1 million from heavy highway design build and other revenues compared to the prior year.

*Operating income—*Operating income was $21.5 million for 2021, an increase of $7.1 million, compared to the prior year. The increase was the result of improved margin mix with the ramp up of construction on large design-build joint venture projects and the continuation of our strategic revenue reduction from lower margin low-bid heavy highway work.

#### E-Infrastructure Solutions

*Revenues—*Revenues were $468.8 million for 2021, an increase of $71.5 million or 18.0%, compared to the prior year. The increase was primarily driven by a higher volume of site development.

*Operating income—*Operating income was $80.5 million for 2021, an increase of $4.0 million, compared to the prior year. The increase was primarily driven by higher volume; however, it was partly offset by continued headwinds from supply chain issues and the related impact on productivity and efficiency.

#### Building Solutions

*Revenues—*Revenues were $317.4 million for 2021, an increase of $41.1 million or 14.9% compared to the prior year. The increase in revenue was primarily the result of a $44.5 million increase in residential revenues, partly offset by a $3.4 million decrease in commercial revenues. Despite inclement weather in Texas in the first half of 2021, the Company’s revenue increased due to a record number of concrete slabs poured in 2021. We continue to see strong demand for new housing in our Texas footprint and our expansion into the Arizona market.

*Operating income—*Operating income was $32.6 million for 2021, an increase of $2.1 million compared to the prior year. The increase was driven by the aforementioned higher volume; however, operating margins declined due to higher material costs for concrete, steel and lumber, and the lack of consistent availability of these materials, as well as labor shortages and increased subcontractor labor costs. While the Company has worked with customers to pass on the increases in material and labor cost, the Company may not be successful in recouping these additional costs in the future.

#### Corporate

*Operating expense—*The corporate overhead element of general and administrative expenses, which is not allocated to the business segments, was $23.4 million for 2021, a decrease of $2.1 million compared to the prior year. Corporate overhead is primarily comprised of corporate headquarters facility expense, the cost of the executive management team, and expenses pertaining to certain centralized functions that benefit the entire Company but are not directly attributable to the businesses, such as corporate human resources, legal, governance and finance functions.

### LIQUIDITY AND SOURCES OF CAPITAL

*Cash—*Cash at December 31, 2021 was $81.8 million, and includes the following components:

*(In thousands)*

|  | As of December 31, 2021 | 2020 |
| --- | ---: | ---: |
| Generally Available | $29,812 | $26,419 |
| Consolidated 50% Owned Subsidiaries | 30,429 | 30,354 |
| Construction Joint Ventures | 21,599 | 9,412 |
| Total Cash | $81,840 | $66,185 |

The following tables set forth information about our cash flows and liquidity:

*(In thousands)*

| Net cash provided by (used in): | Years Ended December 31, 2021 | 2020 |
| --- | ---: | ---: |
| Operating activities | $151,594 | $120,911 |
| Investing activities | (223,449) | (30,491) |
| Financing activities | 87,906 | (68,340) |
| Net change in cash and cash equivalents | $16,051 | $22,080 |

*Operating Activities—*During 2021, net cash provided by operating activities was $151.6 million compared to net cash provided by operating activities of $120.9 million in the prior year. Cash flows provided by operating activities were driven by higher net income, adjusted for various non-cash items and changes in accounts receivable, net contracts in progress and accounts payable balances (collectively, “Contract Capital”), as discussed below, and other accrued liabilities.

*Changes in Contract Capital—*The change in operating assets and liabilities varies due to fluctuations in operating activities and investments in Contract Capital. The changes in components of Contract Capital during the years ended December 31, 2021 and 2020 were as follows:

*(In thousands)*

|  | Years Ended December 31, 2021 | 2020 |
| --- | ---: | ---: |
| Contracts in progress, net | $12,906 | $65,963 |
| Accounts receivable | (8,300) | (8,552) |
| Receivables from and equity in construction joint ventures | (243) | (7,457) |
| Accounts payable | 26,605 | (42,392) |
| Change in Contract Capital, net | $30,968 | $7,562 |

During 2021, the change in Contract Capital increased liquidity by $31.0 million. The Company’s Contract Capital fluctuations are impacted by the mix of projects in Backlog, seasonality, the timing of new awards and related payments for work performed and the contract billings to the customer as projects are completed. Contract Capital is also impacted at period-end by the timing of accounts receivable collections and accounts payable payments for projects.

*Investing Activities—*During 2021, net cash used in investing activities was $223.4 million, compared to net cash used of $30.5 million in the prior year. In 2021, the cash used in investing activities was driven by acquisitions, primarily the Petillo Acquisition, and to a lesser extent, purchases of capital equipment less cash proceeds from the sale of property and equipment. Capital equipment is acquired as needed to support changing levels of production activities and to replace retiring equipment.

*Financing Activities—*During 2021, net cash provided by financing activities was $87.9 million compared to net cash used of $68.3 million in the prior year. In 2021, the cash provided by financing activities was driven by the $140.0 million of cash received from our amended Credit Facility (as defined below), which was utilized to fund the Petillo Acquisition. The financing inflow was partially offset by $48.1 million in repayments on the Term Loan Facility (as defined below), $2.5 million in distributions to noncontrolling interest owners and $1.3 million in payments of debt issuance costs associated with amending our Credit Facility (as defined below).

### Credit Facilities, Debt and Other Capital

*General—*In addition to our available cash, cash equivalents and cash provided by operations, from time to time we use borrowings to finance acquisitions, our capital expenditures and working capital needs.

*Credit Facility—*Our amended credit agreement (as amended, the “Credit Agreement”) provides the Company with senior secured debt financing in an initial principal amount of up to $475.0 million in the aggregate (collectively, the “Credit Facility”), consisting of (i) a senior secured first lien term loan facility (the “Term Loan Facility”) in the initial aggregate principal amount of $400.0 million and (ii) a senior secured first lien revolving credit facility (the “Revolving Credit Facility”) in an aggregate principal amount of $75.0 million (with a $75.0 million limit for the issuance of letters of credit and a $15.0 million sublimit for swing line loans). At December 31, 2021, we had $446.9 million of outstanding borrowings under the Term Loan Facility and no outstanding borrowings under the Revolving Credit Facility. The obligations under the Credit Facility are secured by substantially all assets of the Company and the subsidiary guarantors, subject to certain permitted liens and interests of other parties. The Credit Facility will mature on October 2, 2024.

*Other Debt—*Other debt primarily consists of a subordinated promissory note to the Plateau seller and short-term Paycheck Protection Program loans (the “PPP Loans”) received by the Company’s two 50% owned subsidiaries.

As part of the Plateau Acquisition, the Company issued a $10.0 million subordinated promissory note to one of the Plateau sellers that bears interest at 8% with interest payments due quarterly beginning January 1, 2020. The subordinated promissory note has no scheduled payments, however, it may be repaid in whole or in part at any time, subject to certain payment restrictions under a subordination agreement with the Agent under our Credit Agreement, without premium or penalty, with final payment of all principal and interest then outstanding due on April 2, 2025. At inception, the subordinated promissory note’s interest rate approximated market.

During the second quarter of 2020, the Company’s two 50% owned subsidiaries received three short-term PPP Loans totaling approximately $9.8 million. The loans may be fully or partially forgiven if the funds are used for payroll related costs, interest on mortgages, rent and utilities, and as long as the employee headcount and salary levels remain consistent with our baseline period over an eight to twenty-four week period following the date the loans were received. Any forgiveness of the loans requires approval by the Small Business Administration (“SBA”). If the SBA determines that the loans are not fully or partially forgiven, the balance is subject to a 1% interest rate and requires repayment. During 2021, the SBA forgave two of the PPP Loans totaling approximately $5.0 million, of which the Company recorded a gain on debt extinguishment of approximately $2.5 million for its 50% portion of the gain. The remaining PPP Loan is classified as short-term debt under “Current Liabilities” on the Consolidated Balance Sheet at December 31, 2021, as we filed for a forgiveness determination with the SBA in 2021 and we are awaiting their decision.

*Compliance and Other—*The Credit Agreement contains various affirmative and negative covenants that may, subject to certain exceptions, restrict the ability of us and our subsidiaries to, among other things, grant liens, incur additional indebtedness, make loans, advances or other investments, make non-ordinary course asset sales, declare or pay dividends or make other distributions with respect to equity interests, purchase, redeem or otherwise acquire or retire capital stock or other equity interests, or merge or consolidate with any other person, among various other things. In addition, the Company is required to maintain certain financial covenants. As of December 31, 2021, we were in compliance with all of our restrictive and financial covenants. The Company’s debt is recorded at its carrying amount in the Consolidated Balance Sheets. As of December 31, 2021 and 2020, the carrying values of our debt outstanding approximated the fair values.

*Borrowings—*Based on our average borrowings for 2021 and our 2022 forecasted cash needs, we continue to believe that the Company has sufficient liquid financial resources to fund our requirements for the next year of operations. Furthermore, the Company is continually assessing ways to increase revenues and reduce costs to improve liquidity. However, in the event of a substantial cash constraint and if we were unable to secure adequate debt financing, our liquidity could be materially and adversely affected.

*Issuance Common Stock—*On December 30, 2021, in connection with the acquisition of Petillo, the Company issued 759,447 shares of the Company’s stock as consideration paid to the Petillo sellers. The value of the shares issued was $20.4 million based on Sterling’s closing stock price on December 29, 2021. See *Note 3 - Acquisitions* for further discussion.

*Bonding—*As is customary in the construction business, we are required to provide surety bonds to secure our performance under construction contracts. Our ability to obtain surety bonds primarily depends upon our capitalization, working capital, past performance, management expertise and reputation and certain external factors, including the overall capacity of the surety market. Surety companies consider such factors in relationship to the amount of our backlog and their underwriting standards, which may change from time to time. We have pledged all proceeds and other rights under our construction contracts to our bond surety company. Events that affect the insurance and bonding markets may result in bonding becoming more difficult to obtain in the future, or being available only at a significantly greater cost. To date, we have not encountered difficulties or material cost increases in obtaining new surety bonds.

*Capital Strategy—*The Company will continue to explore additional revenue growth and capital alternatives to improve leverage and strengthen its financial position in order to take advantage of trends in the civil infrastructure and E-infrastructure markets. The Company expects to pursue strategic uses of its cash, such as, investing in projects or businesses that meet its gross margin targets and overall profitability and managing its debt balances.

### Material Cash Requirements

The following table sets forth our material cash requirements from contractual obligations at December 31, 2021:

*(In thousands)*

|  | Payments due by period Total | \<1 Year | 1 - 3 Years | 4 – 5 Years | \>5 Years |
| --- | ---: | ---: | ---: | ---: | ---: |
| Credit Facility | $446,888 | $23,225 | $423,663 | $— | $— |
| Credit Facility interest | 34,434 | 13,205 | 21,229 | — | — |
| Other notes payable (inclusive of outstanding interest) | 13,171 | 948 | 1,823 | 10,400 | — |
| Members’ interest subject to mandatory redemption and undistributed earnings (1) | 55,115 | 55,115 | — | — | — |
| Total | $549,608 | $92,493 | $446,715 | $10,400 | $— |

(1) Mandatory redemption is based on the death or disability of the interest holders. Undistributed earnings can be distributed upon unanimous consent from the members and for tax distributions. At this time we cannot predict when such distributions will be made. The Company has purchased two separate $20.0 million death and permanent total disability insurance policies to mitigate the Company’s cash draw if such events were to occur.

*Capital Expenditures—*Capital equipment is acquired as needed by increased levels of production and to replace retiring equipment. Capital expenditures, net of disposals, incurred in 2021 were $42.5 million. Management expects net capital expenditures in 2022 to be in the range of $50.0 to $55.0 million; however, the award of a project requiring significant purchases of equipment or other factors could result in increased expenditures.

### NEW ACCOUNTING STANDARDS

See the applicable section of *Note 2 - Basis of Presentation and Significant Accounting Policies* for a discussion of new accounting standards.

### CRITICAL ACCOUNTING ESTIMATES

The discussion and analysis of the financial condition and results of operations are based on the Company’s Consolidated Financial Statements, which have been prepared in accordance with accounting policies generally accepted in the U.S. (“GAAP”). The preparation of these Consolidated Financial Statements requires the Company to make estimates and judgments that affect the reported amounts of assets, liabilities, revenue and expenses and related disclosures of contingent assets and liabilities. The Company continually evaluates its estimates based on historical experience and various other assumptions that the Company believes to be reasonable under the circumstances. Actual results may differ from these estimates under different assumptions or conditions. The Company believes the following critical accounting estimates involve more significant judgment used in the preparation of the Consolidated Financial Statements.

### Revenue Recognition

*Performance Obligations Satisfied Over Time—*Revenue for contracts that satisfy the criteria for over time recognition is recognized as the work progresses. The Company measures transfer of control of the performance obligation utilizing the cost-to-cost measure of progress, with cost of revenue including direct costs, such as materials and labor, and indirect costs that are attributable to contract activity. Under the cost-to-cost approach, the use of estimated costs to complete each performance obligation is a significant variable in the process of determining recognized revenue and is a significant factor in the accounting for such performance obligations. Significant estimates that impact the cost to complete each performance obligation are materials, components, equipment, labor and subcontracts; labor productivity; schedule durations, including subcontractor or supplier progress; contract disputes, including claims; achievement of contractual performance requirements; and contingencies, among others. The cumulative impact of revisions in total cost estimates during the progress of work is reflected in the period in which these changes become known, including, to the extent required, the reversal of profit recognized in prior periods and the recognition of losses expected to be incurred on performance obligations in progress. Due to the various estimates inherent in contract accounting, actual results could differ from those estimates, which could result in material changes to the Company’s Consolidated Financial Statements and related disclosures. See “Contract Estimates” within *Note 4 - Revenue from Customers* for further discussion.

### Fair Value Measurements

The Company may use fair value measurements that involve the input of estimates that require significant judgment. The Company’s use of these fair value measurements include:

- determining the purchase price allocation for an acquired business;
- goodwill impairment testing when a quantitative analysis is deemed necessary; and
- long-lived asset (such as property, equipment and intangible assets) impairment testing when impairment indicators are present.

When performing quantitative fair value or impairment evaluations, the Company estimates the fair value of assets by considering the results of income-based and/or a market-based valuation method. Under the income-based method, a discounted cash flow valuation model uses recent forecasts to compare the estimated fair value of each asset to its carrying value. Cash flow forecasts are discounted using the weighted-average cost of capital for the applicable reporting unit at the date of evaluation. The weighted-average cost of capital is comprised of the cost of equity and the cost of debt with a weighting for each that reflects the Company’s current capital structure. Preparation of long-term forecasts involve significant judgments involving consideration of backlog, expected future awards, customer attribution, working capital assumptions and general market trends and conditions. Significant changes in these forecasts or any valuation assumptions, such as the discount rate selected, could affect the estimated fair value of our assets and could result in impairment. Under the market-based method, market information such as multiples of comparable publicly traded companies and/or completed sales transactions are used to develop or validate our fair value conclusions, when appropriate and available.

*Purchase Price Allocations—*The aggregate purchase price for the acquisition of Petillo was allocated to the major categories of assets and liabilities acquired based upon their estimated fair values as of December 30, 2021, which were based, in part, upon internal and external valuations of certain assets, including specifically identified intangible assets and property and equipment. The valuations were based on the income-based and market-based valuation methods noted above. The excess of the purchase price over the estimated fair value of the net tangible and identifiable intangible assets acquired, totaling $67.8 million, was recorded as goodwill. See *Note 3 - Acquisitions* for further discussion.

*Goodwill—*Goodwill is not amortized to earnings, but instead is reviewed for impairment at least annually, absent any indicators of impairment or when other actions require an impairment assessment. The Company performs the annual impairment assessment during the fourth quarter of each year based on balances as of October 1. During the fourth quarter of 2021, 2020 and 2019, the Company performed a qualitative assessment of goodwill, and based on this assessment, no indicators of impairment were present. Factors considered include macroeconomic, industry and competitive conditions, financial performance and reporting unit specific events. These are discussed in a number of places including Item 1A “Risk Factors.” Our annual assessments indicated there was no impairment of goodwill during the years ended December 31, 2021, 2020 and 2019.

*Long-lived Assets—*Long-lived assets, which include property, equipment and acquired intangible assets, are reviewed for impairment whenever events or changes in circumstances indicate that the carrying amount may not be recoverable. If a recoverability assessment is required, the estimated future cash flow associated with the asset or asset group will be compared to their respective carrying amounts to determine if an impairment exists. Actual useful lives and cash flows could be different from those estimated by management, and this could have a material effect on operating results and financial position. For the years ended December 31, 2021, 2020 and 2019, there were no events or changes in circumstances that would indicate a material impairment of our long-lived assets.

## Market risk

As filed, 1,952 characters.

### Interest Rate Risk

We continue to utilize a swap arrangement to hedge against interest rate variability associated with $275.0 million of the $446.9 million outstanding under the Term Loan Facility. The Company has designated its interest rate swap agreement as a cash flow hedging derivative. To the extent the derivative instrument is effective and the documentation requirements have been met, changes in fair value are recognized in other comprehensive income (loss) (“OCI”) until the underlying hedged item is recognized in earnings. At December 31, 2021 the fair value of the swap recorded in accumulated other comprehensive income (loss) (“AOCI”) was a net loss of $2.2 million. For the $171.9 million remaining portion of the Term Loan Facility not associated with the interest rate swap hedge, at December 31, 2021 a 100-basis point (or 1%) increase or decrease in the interest rate would increase or decrease interest expense by approximately $1.7 million per year.

### Other

*Fair Value—*The carrying values of the Company’s cash and cash equivalents, accounts receivable and accounts payable approximate their fair values because of the short-term nature of these instruments. At December 31, 2021, the fair value of the term loan, based upon the current market rates for debt with similar credit risk and maturities, approximated its carrying value as interest is based on LIBOR plus an applicable margin.

*Inflation—*For the past several years, inflation generally has not had a material impact on our financial results. However, beginning in 2021, supply chain volatility has resulted in price increases in oil, fuel, lumber, concrete and steel which have increased our cost of operations, and inflation has increased our general and administrative expense. Anticipated cost increases are considered in our bids to customers; however, inflation has had, and may continue to have, a negative impact on the Company’s financial results.

## Controls and procedures

As filed, 6,801 characters.

### Evaluation of Disclosure Controls and Procedures

Disclosure controls and procedures include, but are not limited to, controls and procedures designed to ensure that information required to be disclosed by an issuer in the reports that it files or submits under the Securities Exchange Act of 1934 is accumulated and communicated to the issuer’s management, including the principal executive and principal financial officers, or persons performing similar functions, as appropriate to allow timely decisions regarding required disclosure.

The Company’s principal executive officer and principal financial officer reviewed and evaluated the Company’s disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Securities Exchange Act of 1934) as of December 31, 2021. As previously disclosed, we completed the Petillo and Kimes Acquisitions on December 30, 2021 and December 28, 2021, respectively, and, as permitted by SEC guidance for newly acquired businesses, we have elected to exclude the acquired operations of Petillo and Kimes from the scope of design and operation of our disclosure controls and procedures for the year ended December 31, 2021. Based on that evaluation, the Company’s principal executive officer and principal financial officer concluded that the Company’s disclosure controls and procedures were effective at December 31, 2021 to ensure that the information required to be disclosed by the Company in this annual report on Form 10-K is recorded, processed, summarized and reported within the time periods specified in the Securities and Exchange Commission’s rules and forms and is accumulated and communicated to the Company’s management including the principal executive and principal financial officers, as appropriate to allow timely decisions regarding required disclosure.

### Management’s Report on Internal Control over Financial Reporting

The Company’s management is responsible for establishing and maintaining adequate internal control over financial reporting. Internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles. Internal control over financial reporting includes those policies and procedures that (i) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect our transactions and dispositions of our assets, (ii) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that our receipts and expenditures are being made only in accordance with authorizations of our management and directors,

and (iii) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of our assets that could have a material effect on the financial statements.

Internal control over financial reporting cannot provide absolute assurance of achieving financial reporting objectives because of its inherent limitations. Internal control over financial reporting is a process that involves human diligence and compliance and is subject to lapses in judgment and breakdowns resulting from human failures. Internal control over financial reporting can also be circumvented by collusion or improper management override. Because of such limitations, there is a risk that material misstatements may not be prevented or detected on a timely basis by internal control over financial reporting. Also, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate. However, these inherent limitations are known features of the financial reporting process. Therefore, it is possible to design into the process safeguards to reduce, though not eliminate, this risk.

Management conducted an assessment of the effectiveness of our internal control over financial reporting as of December 31, 2021. In making this assessment, management used the criteria described in Internal Control - Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission. As permitted by guidance provided by the staff of the SEC, the scope of management’s assessment of the effectiveness of our internal control over financial reporting as of December 31, 2021 did not include the internal controls of Petillo or Kimes, which are included with the Consolidated Financial Statements of the Company. Management has excluded from its evaluation the internal control over financial reporting of Petillo and Kimes, which constituted 22% of total assets. Management will include Petillo and Kimes in the scope of its assessment of internal control over financial reporting beginning in 2022. Based on this assessment, management concluded that our internal control over financial reporting was effective as of December 31, 2021.

### Attestation Report of the Registered Public Accounting Firm

Grant Thornton LLP, the independent registered public accounting firm that audited our Consolidated Financial Statements included in this annual report on Form 10-K, has issued an attestation report on the effectiveness of the Company’s internal control over financial reporting as of December 31, 2021, included in Item 15 “Exhibits and Financial Statement Schedules” under the heading “Reports of the Company’s Independent Registered Public Accounting Firm.”

### Changes in Internal Control over Financial Reporting

We maintain a system of internal control over financial reporting that is designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with accounting principles generally accepted in the U.S. Based on the most recent evaluation, we have concluded that no changes in our internal control over financial reporting occurred during the three months ended December 31, 2021 that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.

### Inherent Limitations on Effectiveness of Controls

Internal control over financial reporting may not prevent or detect all errors and all fraud. Also, projections of any evaluation of effectiveness of internal control to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.