# PPL Corp: Form 10-K for the period ended Dec 31, 2011

- Company: [PPL Corp](/companies/ppl.md) (CIK 922224)
- Form: 10-K
- Filed: 2012-02-28
- Accepted by EDGAR: Feb 28, 2012, 20:32 ET
- Period: 2011-12-31
- Accession: 0000922224-12-000023
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/922224/000092222412000023/form10k.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/922224/000092222412000023/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2011-12-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 12 months, 2011-01-01 to 2011-12-31 | $12.74bn | us-gaap:Revenues |
| Operating income | 3 months, 2011-10-01 to 2011-12-31 | $934.0m | us-gaap:OperatingIncomeLoss |
| Operating income | 12 months, 2011-01-01 to 2011-12-31 | $3.10bn | us-gaap:OperatingIncomeLoss |
| Interest expense | 12 months, 2011-01-01 to 2011-12-31 | $898.0m | us-gaap:InterestExpense |
| Income tax | 12 months, 2011-01-01 to 2011-12-31 | $691.0m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2011-10-01 to 2011-12-31 | $454.0m | us-gaap:NetIncomeLoss |
| Net income | 12 months, 2011-01-01 to 2011-12-31 | $1.50bn | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2011-10-01 to 2011-12-31 | $0.78 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 12 months, 2011-01-01 to 2011-12-31 | $2.70 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2011-10-01 to 2011-12-31 | $0.78 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 12 months, 2011-01-01 to 2011-12-31 | $2.71 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 12 months, 2011-01-01 to 2011-12-31 | 550,952,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 12 months, 2011-01-01 to 2011-12-31 | $2.51bn | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 12 months, 2011-01-01 to 2011-12-31 | $2.49bn | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Dividends paid | 12 months, 2011-01-01 to 2011-12-31 | $746.0m | us-gaap:PaymentsOfDividendsCommonStock |
| Cash and equivalents | at 2011-12-31 | $1.20bn | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2011-12-31 | $6.43bn | us-gaap:AssetsCurrent |
| Total assets | at 2011-12-31 | $42.65bn | us-gaap:Assets |
| Current liabilities | at 2011-12-31 | $5.25bn | us-gaap:LiabilitiesCurrent |
| Long-term debt | at 2011-12-31 | $17.99bn | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2011-12-31 | $0 | us-gaap:LongTermDebtCurrent |
| Short-term borrowings | at 2011-12-31 | $578.0m | us-gaap:ShortTermBorrowings |
| Shareholders' equity | at 2011-12-31 | $10.83bn | us-gaap:StockholdersEquity |

## Business

As filed, 77,616 characters.

### BACKGROUND

*PPL Corporation*, headquartered in Allentown, Pennsylvania, is an energy and utility holding company that was incorporated in 1994. Through its subsidiaries, PPL generates electricity from power plants in the northeastern, northwestern and southeastern U.S.; markets wholesale or retail energy primarily in the northeastern and northwestern portions of the U.S.; delivers electricity to customers in Pennsylvania, Kentucky, Virginia, Tennessee and the U.K. and natural gas to customers in Kentucky.

In 2011 and 2010, PPL completed two acquisitions:

- On April 1, 2011, PPL, through its indirect, wholly owned subsidiary, PPL WEM, completed its acquisition of all the outstanding ordinary share capital of Central Networks East plc and Central Networks Limited, the sole owner of Central Networks West plc, together with certain other related assets and liabilities (collectively referred to as Central Networks and subsequently renamed WPD Midlands), from subsidiaries of E.ON AG. The consideration for the acquisition consisted of cash of $5.8 billion, including the repayment of $1.7 billion of affiliate indebtedness owed to subsidiaries of E.ON AG and $800 million of long-term debt assumed through consolidation. WPD Midlands operates two regulated distribution networks that serve five million end-users in the Midlands area of England.
- On November 1, 2010, PPL acquired all of the limited liability company interests of E.ON U.S. LLC from a wholly owned subsidiary of E.ON AG. Upon completion of the acquisition, E.ON U.S. LLC was renamed LG&E and KU Energy LLC (LKE). LKE is engaged in regulated utility operations through its subsidiaries, LG&E and KU. The consideration for the acquisition consisted of cash of $6.8 billion, including the repayment of $4.3 billion of affiliate indebtedness owed to subsidiaries of E.ON AG, and $800 million of debt assumed through consolidation.
- See Note 10 to the Financial Statements for additional information on both acquisitions.

The acquisitions of WPD Midlands and LKE: (1) substantially reapportion the mix of PPL's regulated and competitive businesses by increasing the regulated portion of its business; (2) strengthen PPL's credit profile; and (3) enhance rate-regulated growth opportunities as the regulated businesses make investments to meet environmental compliance requirements and improve infrastructure and customer reliability. The investment in regulated assets also provides earnings stability through regulated returns and the ability to recover prudently incurred capital investments, in contrast to the competitive supply business where earnings and cash flows are subject to market conditions. At December 31, 2011, PPL had:

- $12.7 billion in operating revenues (including eight months from WPD Midlands, which are recorded on a one-month lag)
- 10.5 million end-users of its utility services (including 5 million end-users served by the WPD Midlands companies)
- Approximately 19,000 MW of generation
- Approximately 18,000 full-time employees

In January 2011, PPL Energy Supply distributed its 100% membership interest in PPL Global to its parent, PPL Energy Funding (the parent holding company of PPL Energy Supply and PPL Global with no other material operations), to better align PPL's organizational structure with the manner in which it manages its businesses and reports segment information in its consolidated financial statements. The distribution separated the U.S.-based competitive energy marketing and supply business from the U.K.-based regulated electricity distribution business. See Note 9 to the Financial Statements for additional information.

At December 31, 2011 PPL's principal subsidiaries are shown below (\* denotes an SEC registrant; LKE, LG&E and KU became SEC registrants effective June 1, 2011):

In addition to PPL Corporation, the other SEC registrants included in this filing are:

*PPL Energy Supply, LLC*, headquartered in Allentown, Pennsylvania, is an indirect wholly owned subsidiary of PPL formed in 2000 and is an energy company engaged through its subsidiaries in the generation and marketing of electricity, primarily in the northeastern and northwestern power markets of the U.S. PPL Energy Supply's major operating subsidiaries are PPL EnergyPlus and PPL Generation. As noted above, in January 2011, PPL Energy Supply distributed its 100% membership interest in PPL Global to its parent, PPL Energy Funding. For 2010 and 2009, the operating results of PPL Global, which represents the International Regulated segment, are classified as Discontinued Operations. At December 31, 2011, PPL Energy Supply owned or controlled 10,508 MW of electric power generation capacity and is implementing capital projects at certain of its existing generation facilities in Pennsylvania and Montana to provide 191 MW of additional generating capacity by the end of 2013.

*PPL Electric Utilities Corporation*, headquartered in Allentown, Pennsylvania, is a direct subsidiary of PPL incorporated in 1920 and a regulated public utility. PPL Electric delivers electricity in its Pennsylvania service territory and provides electricity supply to retail customers in that territory as a PLR under the Customer Choice Act.

*LG&E and KU Energy LLC,* headquartered in Louisville, Kentucky, is a holding company with regulated utility operations through its subsidiaries, LG&E and KU, and is a wholly owned subsidiary of PPL. LKE, formed in 2003, is the successor to a Kentucky entity incorporated in 1989.

*Louisville Gas and Electric Company,* headquartered in Louisville, Kentucky, is a regulated utility engaged in the generation, transmission, distribution and sale of electricity and the distribution and sale of natural gas in Kentucky. LG&E was incorporated in Kentucky in 1913. At December 31, 2011, LG&E owned 3,352 MW of electric power generation capacity and, subject to certain regulatory approvals, is implementing capital projects at certain of its existing generation facilities to provide 483 MW of additional generating capacity by 2016. LG&E also anticipates retiring 563 MW of generating capacity by the end of 2015 to meet certain environmental regulations. LG&E and KU jointly dispatch their generation units with the lowest cost generation used to serve their retail native load.

*Kentucky Utilities Company,* headquartered in Lexington, Kentucky, is a regulated utility engaged in the generation, transmission, distribution and sale of electricity in Kentucky, Virginia and Tennessee. KU was incorporated in Kentucky in 1912 and Virginia in 1991. KU serves its Virginia customers under the Old Dominion Power name while its Kentucky and Tennessee customers are served under the KU name. At December 31, 2011, KU owned 4,833 MW of electric power generation capacity and, subject to certain regulatory approvals, is implementing capital projects at certain of its existing generation facilities to provide 652 MW of additional generating capacity by 2016. KU also anticipates retiring 234 MW of generating capacity by the end of 2015 to meet certain environmental regulations. KU and LG&E jointly dispatch their generation units with the lowest cost generation used to serve their retail native load.

PPL's utility subsidiaries, and to a lesser extent, certain of its competitive supply subsidiaries, are subject to extensive regulation by the FERC including: wholesale sales of power and related transactions, electric transmission service, accounting practices, issuances and sales of securities, acquisitions and sales of utility properties and payments of dividends. PPL and LKE are subject to certain FERC regulations as holding companies under PUHCA and the Federal Power Act, including with respect to accounting and record-keeping, inter-system sales of non-power goods and services and acquisitions of securities in, or mergers with, certain types of electric utility companies.

Successor and Predecessor Financial Presentation *(LKE, LG&E and KU)*

LKE's, LG&E's and KU's Financial Statements and related financial and operating data include the periods before and after PPL's acquisition of LKE on November 1, 2010 and have been segregated to present pre-acquisition activity as the Predecessor and post-acquisition activity as the Successor. Predecessor activity covers the time period prior to November 1, 2010. Successor activity covers the time period after October 31, 2010. Certain accounting and presentation methods were changed to acceptable alternatives to conform to PPL's accounting policies, and the cost bases of certain assets and liabilities were changed as of November 1, 2010 as a result of the application of push-down accounting. Consequently, the financial position, results of operations and cash flows for the Successor periods are not comparable to the Predecessor periods; however, the core operations of LKE, LG&E and KU have not changed as a result of the acquisition.

#### Segment Information

#### (PPL)

Following the November 1, 2010 acquisition of LKE, PPL is organized into four reportable segments: Kentucky Regulated, International Regulated, Pennsylvania Regulated and Supply. There were no changes to reportable segments in 2011.

#### (PPL Energy Supply)

In 2011, PPL Energy Supply operated in a single reportable segment. Prior to 2011, PPL Energy Supply's segments consisted of Supply and International Regulated. In January 2011, PPL Energy Supply distributed its 100% membership interest in PPL Global to its parent, PPL Energy Funding, to better align PPL's organizational structure with the manner in which it manages its businesses and reports segment information in its consolidated financial statements. For 2010 and 2009, the operating results of PPL Global, which represent the International Regulated segment, are classified as discontinued operations.

#### (PPL Electric, LKE, LG&E and KU)

PPL Electric, LKE, LG&E and KU each operate in a single reportable segment.

#### (PPL and PPL Energy Supply)

See Note 2 to the Financial Statements for financial information about the segments and geographic financial data.

|  |  |
| --- | --- |
| · | **Kentucky Regulated Segment (PPL)** |
|  | Consists of the operations of LKE, which owns and operates regulated public utilities engaged in the generation, transmission, distribution and sale of electricity and the distribution and sale of natural gas, representing primarily the activities of LG&E and KU. The Kentucky Regulated segment also includes interest expense related to the 2010 Equity Units that were issued to partially finance the acquisition of LKE. |

#### (PPL, LKE, LG&E and KU)

LKE became a wholly owned subsidiary of PPL on November 1, 2010. LG&E and KU are engaged in the regulated generation, transmission, distribution and sale of electricity in Kentucky and, in KU's case, Virginia and Tennessee. LG&E also engages in the distribution and sale of natural gas in Kentucky. LG&E provides electric service to approximately 394,000 customers in Louisville and adjacent areas in Kentucky, covering approximately 700 square miles in 9 counties. LG&E provides natural gas service to approximately 319,000 customers in its electric service area and 7 additional counties in Kentucky. KU provides electric service to approximately 512,000 customers in 77 counties in central, southeastern and western Kentucky; approximately 29,000 customers in 5 counties in southwestern Virginia; and fewer than 10 customers in Tennessee, covering approximately 4,800 non-contiguous square miles. KU also sells wholesale electricity to 12 municipalities in Kentucky under load following contracts. In Virginia, KU operates under the name Old Dominion Power Company.

#### Acquisition by PPL

In September 2010, the KPSC approved a settlement agreement among PPL and all of the intervening parties to PPL's joint application to the KPSC for approval of its acquisition of ownership and control of LKE. In the settlement agreement, the parties agreed that LG&E and KU would commit that no base rate increases would take effect before January 1, 2013. The rate increases for LG&E and KU that took effect on August 1, 2010 (as described below) are not impacted by the settlement. Under the terms of the settlement, LG&E and KU retain the right to seek approval for the deferral of "extraordinary and uncontrollable costs." Interim rate adjustments will continue to be permissible during that period through existing fuel, environmental and demand side management recovery mechanisms. The agreement also substitutes an acquisition savings shared deferral mechanism for the previous commitment that LG&E and KU file a synergies plan with the KPSC post-closing. This mechanism, which will be in place until the earlier of five years or the first day of the year in which a base rate increase becomes effective, permits LG&E and KU to each earn up to a 10.75% return on equity. Any earnings above a 10.75% return on equity will be shared with customers on a 50%/50% basis. The KPSC Order and the settlement agreement contained a number of other commitments by LG&E and KU with regard to operations, workforce, community involvement and other matters.

In October 2010, both the VSCC and the TRA approved the transfer of control of LKE to PPL. Certain of these Orders contained additional commitments with regard to operations, workforce, community involvement and other matters.

Also in October 2010, the FERC approved the application for the transfer of control of the utilities. The approval includes various conditional commitments, such as a continuation of certain existing undertakings with intervenors in prior cases, an agreement not to terminate certain KU municipal customer contracts prior to January 2017, an exclusion of any transaction-related costs from wholesale energy and tariff customer rates to the extent that LG&E and KU have agreed not to seek recovery of the same transaction-related cost from retail customers and agreements to coordinate with intervenors in certain open or ongoing matters.

See Note 6 to the Financial Statements for additional information on regulatory matters related to the acquisition.

#### Franchises and Licenses

LG&E and KU provide electric delivery service, and LG&E provides natural gas distribution service, in their various service territories pursuant to certain franchises, licenses, statutory service areas, easements and other rights or permissions granted by state legislatures, cities or municipalities or other entities.

#### Competition

There are currently no other electric public utilities operating within the electric service areas of LKE. Neither the Kentucky General Assembly nor the KPSC has adopted or approved a plan or timetable for retail electric industry competition in Kentucky. The nature or timing of any legislative or regulatory actions regarding industry restructuring and their impact on LKE, which may be significant, cannot currently be predicted. Virginia, formerly a deregulated jurisdiction, has enacted legislation which implemented a hybrid model of cost-based regulation. KU's operations in Virginia have been and remain regulated.

Alternative energy sources such as electricity, oil, propane and other fuels provide indirect competition for natural gas revenues of LKE. Marketers may also compete to sell natural gas to certain large end-users. LG&E's natural gas tariffs include gas price pass-through mechanisms relating to its sale of natural gas as a commodity; therefore, customer natural gas purchases from alternative suppliers do not generally impact profitability. However, some large industrial and commercial customers may physically bypass LG&E's facilities and seek delivery service directly from interstate pipelines or other natural gas distribution systems.

In April 2010, the KPSC commenced a proceeding to investigate the regulatory, financial and operational aspects of natural gas retail competition programs and the potential benefits to Kentucky consumers. A number of entities, including LG&E, were parties to the proceeding. In December 2010, the KPSC issued an Order in the proceeding declining to endorse natural gas competition at the retail level, noting the existence of a number of transition or oversight costs and an uncertain level of economic benefits in such programs. With respect to existing natural gas transportation programs available to large commercial or industrial users, the Order indicates that the KPSC will review utilities' current tariff structures, user thresholds and other terms and conditions of such programs, as part of such utilities' next regular natural gas rate cases.

#### Operating Revenues

LG&E serves approximately 394,000 electricity customers, and its electric transmission and distribution system territory covers more than 700 square miles in 9 counties. KU serves approximately 541,000 electricity customers, and its transmission and distribution system territory covers more than 4,800 non-contiguous square miles in 82 counties. LG&E purchases, transports, distributes or stores natural gas for approximately 319,000 customers in Kentucky. LG&E's natural gas service area covers more than 3,600 square miles in 16 counties. In 2011, 27% of LG&E's annual natural gas throughput was purchased by large commercial and industrial customers directly from alternate suppliers for delivery through LG&E's distribution system.

#### (PPL)

Details of operating revenues for the Kentucky Regulated segment by customer class for the year ended December 31, 2011 and the two months ended December 31, 2010 are shown below.

|  | 2011 Revenue | % of Revenue | 2010 Revenue | % of Revenue |
| --- | ---: | ---: | ---: | ---: |
| Industrial and commercial | $1,252 | 45 | $209 | 42 |
| Residential | 1,087 | 39 | 219 | 44 |
| Retail - other | 269 | 9 | 42 | 9 |
| Wholesale - municipal | 104 | 4 | 15 | 3 |
| Wholesale - other | 81 | 3 | 8 | 2 |
| Total | $2,793 | 100 | $493 | 100 |

#### (LKE, LG&E and KU)

Details of operating revenues by customer class are shown below.

| LKE | Successor Year Ended December 31, 2011 Revenue | % of Revenue | Two Months Ended December 31, 2010 Revenue | % of Revenue | Predecessor Ten Months Ended October 31, 2010 Revenue | % of Revenue | Year Ended December 31, 2009 Revenue | % of Revenue |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Industrial and commercial | $1,252 | 45 | $209 | 42 | $997 | 45 | $1,112 | 44 |
| Residential | 1,087 | 39 | 219 | 44 | 886 | 40 | 1,020 | 41 |
| Retail - other | 269 | 9 | 43 | 9 | 212 | 10 | 227 | 9 |
| Wholesale - municipal | 104 | 4 | 15 | 3 | 88 | 4 | 91 | 4 |
| Wholesale - other (a) | 81 | 3 | 8 | 2 | 31 | 1 | 51 | 2 |
| Total | $2,793 | 100 | $494 | 100 | $2,214 | 100 | $2,501 | 100 |
| **LG&E** |  |  |  |  |  |  |  |  |
| Industrial and commercial | $524 | 38 | $92 | 36 | $409 | 39 | $475 | 37 |
| Residential | 561 | 41 | 113 | 44 | 446 | 42 | 540 | 42 |
| Retail - other | 130 | 10 | 22 | 9 | 98 | 9 | 109 | 9 |
| Wholesale - other (a) (b) | 149 | 11 | 27 | 11 | 104 | 10 | 148 | 12 |
| Total | $1,364 | 100 | $254 | 100 | $1,057 | 100 | $1,272 | 100 |
| **KU** |  |  |  |  |  |  |  |  |
| Industrial and commercial | $728 | 47 | $117 | 44 | $588 | 47 | $637 | 47 |
| Residential | 526 | 34 | 106 | 40 | 440 | 35 | 480 | 35 |
| Retail - other | 139 | 9 | 21 | 8 | 114 | 9 | 118 | 9 |
| Wholesale - municipal | 104 | 7 | 15 | 6 | 88 | 7 | 91 | 7 |
| Wholesale - other (a) (b) | 51 | 3 | 4 | 2 | 18 | 2 | 29 | 2 |
| Total | $1,548 | 100 | $263 | 100 | $1,248 | 100 | $1,355 | 100 |

(a) Includes wholesale and transmission revenues.

(b) Includes intercompany power sales and transmission revenues, which are eliminated upon consolidation at LKE.

#### (PPL, LKE, LG&E and KU)

#### Power Supply

At December 31, 2011, LKE owned, controlled or had an ownership interest in generating capacity (summer rating) of 8,185 MW, of which 3,352 MW related to LG&E and 4,833 MW related to KU, in Kentucky, Indiana, and Ohio. See "Item 2. Properties - Kentucky Regulated Segment" for a complete list of LKE's generating facilities.

The system capacity of LKE's owned or controlled generation is based upon a number of factors, including the operating experience and physical condition of the units, and may be revised periodically to reflect changes in circumstances.

During 2011, LKE's power plants generated the following amounts of electricity.

| Fuel Source | Thousands of MWhs LKE Southeastern | Midwestern | LG&E Southeastern | Midwestern | KU Southeastern | Midwestern |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Coal (a) | 33,897 | 1,132 | 15,291 | 783 | 18,606 | 349 |
| Oil / Gas | 497 |  | 175 |  | 322 |  |
| Hydro | 290 |  | 208 |  | 82 |  |
| Total | 34,684 | 1,132 | 15,674 | 783 | 19,010 | 349 |
| Overall total (b) |  | 35,816 |  | 16,457 |  | 19,359 |

(a) The Midwestern generation represents power generated by and purchased from OVEC.

(b) This generation represents a 1% increase for LKE, a 7% decrease for LG&E and an 8% increase for KU from 2010 output.

A significant portion of LG&E's and KU's generated electricity was used to supply its retail and municipal customer base.

LG&E and KU jointly dispatch their generation units with the lowest cost generation used to serve their retail native load. When LG&E has excess generation capacity after serving its own retail native load and its generation cost is lower than that of KU, KU purchases electricity from LG&E. When KU has excess generation capacity after serving its own retail native load and its generation cost is lower than that of LG&E, LG&E purchases electricity from KU.

See "Item 2. Properties - Kentucky Regulated Segment" for additional information regarding LG&E's and KU's plans for capital projects, subject to certain regulatory approvals, that are expected to provide 483 MW and 652 MW of additional electric generating capacity by 2016. LG&E and KU also anticipate retiring 563 MW and 234 MW of generating capacity by the end of 2015 to meet certain environmental regulations.

#### Fuel Supply

Coal is expected to be the predominant fuel used by LG&E and KU for baseload generation for the foreseeable future, with natural gas and oil being used for intermediate and peaking capacity and flame stabilization in coal-fired boilers.

Fuel inventory is maintained at levels estimated to be necessary to avoid operational disruptions at coal-fired generating units. Reliability of coal deliveries can be affected from time to time by a number of factors including fluctuations in demand, coal mine production issues and other supplier or transporter operating difficulties.

LG&E and KU have entered into coal supply agreements with various suppliers for coal deliveries through 2016 and normally augment their coal supply agreements with spot market purchases.

For their existing units, LG&E and KU expect for the foreseeable future to purchase most of their coal from western Kentucky, southern Indiana, southern Illinois and Ohio. The use of high sulfur coal will increase in 2012 due to the installation of scrubbers at KU's E.W. Brown plant. In 2012 and beyond, LG&E and KU may purchase certain quantities of ultra-low sulfur content coal from Wyoming for blending at TC2. Coal is delivered to the generating plants by barge, truck and rail.

#### (PPL, LKE and LG&E)

#### Natural Gas Supply

Five underground natural gas storage fields, with a current working natural gas capacity of approximately 15 Bcf, are used in providing natural gas service to LG&E's firm sales customers. By using natural gas storage facilities, LG&E avoids the costs typically associated with more expensive pipeline transportation capacity to serve peak winter heating loads. Natural gas is stored during the summer season for withdrawal during the following winter heating season. Without this storage capacity, LG&E would be required to purchase additional natural gas and pipeline transportation services during winter months when customer demand increases and the prices for natural gas supply and transportation services are typically at their highest. Several suppliers under contracts of varying duration provide competitively priced natural gas. At December 31, 2011, LG&E had an 11 Bcf inventory balance of natural gas stored underground with a carrying value of $53 million.

LG&E has a portfolio of supply arrangements of varying terms with a number of suppliers designed to meet its firm sales obligations. These natural gas supply arrangements include pricing provisions that are market-responsive. In tandem with pipeline transportation services, these natural gas supplies provide the reliability and flexibility necessary to serve LG&E's natural gas customers.

LG&E purchases natural gas supply transportation services from two pipelines. LG&E has contracts with one pipeline that are subject to termination by LG&E between 2013 and 2018. Total winter capacity under these contracts is 195,000 MMBtu/day and summer capacity is 88,000 MMBtu/day. LG&E has a contract with the other pipeline that expires in October 2012. Total winter and summer capacity under this contract is 51,000 MMBtu/day during both seasons. That contract has been renegotiated through 2014 for a total capacity of 20,000 MMBtu/day during both the winter and summer seasons beginning in November 2012.

#### (PPL, LKE, LG&E and KU)

#### Rates and Regulation

LG&E is subject to the jurisdiction of the KPSC and the FERC, and KU is subject to the jurisdiction of the KPSC, the FERC, the VSCC and the TRA. LG&E and KU operate under a FERC-approved open access transmission tariff. LG&E and KU contract with the Tennessee Valley Authority, to act as their transmission reliability coordinator, and Southwest Power Pool, Inc. (SPP), to function as their independent transmission operator, pursuant to FERC requirements. The contract with SPP expires on August 31, 2012. LG&E and KU have received FERC approval to transfer from SPP to TranServ International, Inc. as their independent transmission operator beginning September 1, 2012. Approval from the KPSC is also required, and an application requesting approval was filed in January 2012.

LG&E's and KU's Kentucky base rates are calculated based on a return on capitalization (common equity, long-term debt and notes payable) including certain adjustments to exclude non-regulated investments and environmental compliance costs recovered separately through the ECR mechanism. As such, regulatory assets generally earn a return.

KU's Virginia base rates are calculated based on a return on rate base (net utility plant plus working capital less deferred taxes and miscellaneous deductions). All regulatory assets and liabilities, except the levelized fuel factor, are excluded from the return on rate base utilized in the calculation of Virginia base rates; therefore, no return is earned on the related assets.

KU's rates to municipal customers for wholesale requirements are calculated based on annual updates to a rate formula that utilizes a return on rate base (net utility plant plus working capital less deferred taxes and miscellaneous deductions). All regulatory assets and liabilities are excluded from the return on rate base utilized in the development of municipal rates; therefore, no return is earned on the related assets.

See Note 6 to the Financial Statements for additional information on cost recovery mechanisms.

#### Kentucky Rate Case

In January 2010, LG&E and KU filed applications with the KPSC requesting increases in electric base rates of approximately 12%, or $95 million for LG&E and $135 million for KU annually. In addition, LG&E requested an increase in its natural gas base rates of approximately 8%, or $23 million annually. In June 2010, LG&E and KU and all of the intervenors, except the Attorney General, agreed to a stipulation providing for increases in LG&E's electric base rates of $74 million annually, LG&E's natural gas base rates of $17 million annually and KU's electric base rates of $98 million annually. All parties, except the Attorney General, jointly filed a request with the KPSC to approve such stipulation. An Order in the proceeding was issued in July 2010, approving all of the provisions in the stipulation. The KPSC Order determined a return on equity range of 9.75% to 10.75% to be reasonable and noted that the stipulation was within such range. The new rates became effective on August 1, 2010.

#### (PPL, LKE and KU)

#### Virginia Rate Case

In April 2011, KU filed an application with the VSCC requesting an increase in electric base rates for its Virginia jurisdictional customers of $9 million annually, or 14%. In September 2011, a settlement stipulation was reached between KU and the VSCC Staff and filed with the VSCC for consideration. In October 2011, the VSCC approved the stipulation with two modifications that were accepted by KU. The VSCC issued an Order closing the proceeding in October 2011. The approved revenue increase was $7 million annually, based on a return on equity of 10.3%, with new base rates effective November 1, 2011.

#### FERC Wholesale Rate Case

In September 2008, KU filed an application with the FERC for increases in electric base rates applicable to wholesale power sales contracts or interchange agreements involving, collectively, 12 Kentucky municipalities. The application requested a shift from an all-in stated unit charge rate to an unbundled formula rate. This application was approved by the FERC, and annual adjustments are made to the rates charged to the Kentucky municipalities with applications being submitted each May and revised rates taking effect on July 1. In May 2011, KU submitted to the FERC the annual adjustments to the formula rate which incorporated certain proposed decreases. These rates became effective as of July 1, 2011, with no issues raised by the wholesale requirements customers or the FERC.

|  |  |
| --- | --- |
| · | International Regulated Segment (PPL) |
|  | Includes WPD, a regulated electricity distribution company in the U.K. |

WPD, through indirect wholly owned subsidiaries, operates four of the 15 distribution networks providing electricity service in the U.K. With the April 2011 acquisition of WPD Midlands, the total number of end-users served has more than doubled totaling 7.8 million across 21,585 square miles in Wales, southwest and central England. See Note 10 to the Financial Statements for additional information on the acquisition.

Details of revenue by category for the years ended December 31 are shown below.

|  | 2011 Revenue | % of Revenue | 2010 Revenue | % of Revenue | 2009 Revenue | % of Revenue |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Utility revenues (a) | $1,618 | 98 | $727 | 96 | $684 | 96 |
| Energy-related businesses | 35 | 2 | 34 | 4 | 32 | 4 |
| Total | $1,653 | 100 | $761 | 100 | $716 | 100 |

(a) The amounts for 2011 are not comparable to 2010 or 2009 as WPD Midlands was acquired in April 2011. 2011 includes eight months of activity as WPD Midlands' results are recorded on a one-month lag.

WPD's energy-related businesses revenues include ancillary activities that support the distribution business, including telecommunications and real estate. WPD's telecommunication revenues are from the rental of fiber optic cables primarily attached to WPD's overhead electricity distribution network. WPD also provides meter services to businesses across the U.K.

#### Franchise and Licenses

WPD is authorized by Ofgem to provide electric distribution services within its concession areas and service territories, subject to certain conditions and obligations. For instance, WPD is subject to Ofgem regulation of the prices it can charge and the quality of service it must provide, and WPD can be fined or have its licenses revoked if it does not meet the mandated standard of service.

#### Competition

Although WPD operates in non-exclusive concession areas in the U.K., it currently faces little competition with respect to end-users connected to its network. WPD's four distribution businesses, WPD (South West), WPD (South Wales), WPD (West Midlands) and WPD (East Midlands), are thus regulated monopolies which operate under regulatory price controls.

#### Revenue and Regulation

The operations of WPD (South West), WPD (South Wales), WPD (East Midlands) and WPD (West Midlands) are regulated by Ofgem under the direction of the Gas and Electricity Markets Authority. The Electricity Act 1989 provides the fundamental legal framework of electricity companies and established licenses that required each of the Distribution Network Operators (DNOs) to develop, maintain and operate efficient distribution networks. Ofgem has established a price control mechanism that restricts the amount of revenue that can be earned by regulated business and provides for an increase or reduction in revenues based on incentives or penalties for exceeding or underperforming against pre-established targets.

This regulatory structure is an incentive-based regulatory structure in comparison to the U.S. utility businesses which operate under a cost-based regulatory framework. Under the UK regulatory structure, electricity distribution revenues are currently set every five years, but extending to eight years in the next price control period beginning in April 2015. The revenue that DNOs can earn in each of the five years is the sum of: i) the regulator's view of efficient operating costs, ii) a return on the capital from the RAV plus an annual adjustment for the inflation determined by Retail Price Index (RPI) for the prior calendar year, iii) a return of capital from the RAV (i.e. depreciation), and iv) certain pass-through costs over which the DNO has no control. Additionally, incentives are provided for a range of activities including exceeding certain reliability and customer service targets.

WPD is currently operating under DPCR5 which was completed in December 2009 and is effective for the period from April 1, 2010 through March 31, 2015. Ofgem allowed WPD (South West) and WPD (South Wales) an average increase in total revenues, before inflationary adjustments, of 6.9% in each of the five years and WPD Midlands an average increase in total revenues, before inflationary adjustments, of 4.5% in each of the five years. The revenue increase includes reimbursement for higher operating and capital costs to be incurred driven by additional requirements. In DPCR5, Ofgem decoupled WPD's allowed revenue from volume delivered over the five-year price control period. However, in any fiscal period WPD's revenue could be negatively affected if its tariffs and the volume delivered do not fully recover the allowed revenue for a given period. Any under recovery would be recovered in the next regulatory year, but would not be recorded as a receivable in the current period. Any over recovery would be reflected in the current period as a liability and would not be included in revenue.

In addition to providing a base revenue allowance, Ofgem has established incentive mechanisms to provide significant opportunities to enhance overall returns by improving network efficiency, reliability and customer service. Some of the more significant incentive mechanisms under DPCR5 include:

- Interruptions Incentive Scheme (IIS) - This incentive has two major components: 1) Customer interruptions and 2) Customer minutes lost and is designed to incentivize the DNOs to invest and operate their networks to manage and reduce both the frequency and duration of power outages experienced by customers. The target for each DNO is based on an average of the data from the prior price control period.

Beginning April 1, 2012, an additional customer satisfaction incentive mechanism will be implemented that will include a customer satisfaction survey, a complaints metric and a measure of stakeholder engagement. This incentive will replace the customer response telephone performance incentive that was effective April 1, 2010.

- Line Loss Incentive - This incentive existed in the prior price control review and is designed to incentivize DNOs to invest in lower loss equipment, to change the way they operate their systems to reduce losses, and to detect theft and unregistered meters. The targets for each of WPD's four DNOs are set based on their performance during DPCR4. In DPCR5, Ofgem introduced a two year lag in reporting losses to allow for all settlement data to be received. WPD has a $170 million liability recorded at December 31, 2011, calculated in accordance with an accepted methodology, related to the close-out of line losses for the prior price control period, DPCR4. Ofgem is currently consulting on the methodology used to calculate the final line loss incentive/penalty for DPCR4. In October 2011, Ofgem issued a consultation paper citing two potential changes to the methodology, both of which would result in a reduction of the liability; however, it is uncertain at this time whether any changes will be made. Ofgem is expected to make a decision before the end of 2012.
- Information Quality Incentive (IQI) - The IQI is designed to incentivize the DNOs to provide good quality information when they submit their business plans to Ofgem during the price control process and to execute the plan they submitted. The IQI eliminates the distinction between capital expenditure and operating expense and instead looks at total expenditure. Total expenditure is allocated 85% to "slow pot" which is added to RAV and recovered over 20 years through the regulatory depreciation of the RAV and 15% to "fast pot" which is recovered during the current price control review period. The IQI then provides for incentives or penalties at the end of DPCR5 based on the ratio of actual expenditures to the expenditures submitted to Ofgem that were the basis for the revenues allowed during the five-year price control review period.

At the beginning of DPCR5, WPD was awarded $301 million in incentive revenue of which $222 million will be included in revenue throughout the current price control period with the balance recovered over subsequent price control periods. Additional incentive revenue primarily from the IIS of $30 million related to performance for the regulatory year ended March 31, 2011 and will be included in revenues for the 2012-2013 regulatory year.

In October 2010, Ofgem announced a new pricing model that will be effective for the U.K. electricity distribution sector, including WPD, beginning April 2015. The model, known as RIIO (Revenues = Incentives + Innovation + Outputs), is intended to encourage investment in regulated infrastructure. Key components of the model are: an extension of the price review period to eight years, increased emphasis on outputs and incentives, enhanced stakeholder engagement including network customers, a stronger incentive framework to encourage more efficient investment and innovation, expansion of the current Low Carbon Network Fund to stimulate innovation and continued use of a single weighted average cost of capital. Ofgem has also indicated that the depreciation of the RAV for RAV additions after April 1, 2015 will change from 20 years to 45 years. At this time, management does not expect the effect of RIIO to be significant to WPD's financial results. See "Item 1A. Risk Factors - Risks Related to International Regulated Segment."

#### Customers

The majority of WPD's revenue is known as DUoS and is derived from charging energy suppliers for the delivery of electricity to end-users and thus its customers are the suppliers to those end-users. Ofgem requires that all licensed electricity distributors and suppliers become parties to the Distribution Connection and Use of System Agreement. This agreement sets out how creditworthiness will be determined and, as a result, whether the supplier needs to provide collateral.

|  |  |
| --- | --- |
| · | Pennsylvania Regulated Segment (PPL) |
|  | Includes the regulated electric delivery operations of PPL Electric. |

#### (PPL and PPL Electric)

PPL Electric is subject to regulation as a public utility by the PUC, and certain of its transmission activities are subject to the jurisdiction of the FERC under the Federal Power Act. PPL Electric delivers electricity to approximately 1.4 million customers in a 10,000-square mile territory in 29 counties of eastern and central Pennsylvania. PPL Electric also provides electricity supply in this territory as a PLR.

Details of electric revenues by customer class for the years ended December 31, are shown below.

|  | 2011 Revenue | % of Revenue | 2010 Revenue | % of Revenue | 2009 Revenue | % of Revenue |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Residential | $1,266 | 67 | $1,469 | 60 | $1,473 | 45 |
| Industrial | 62 | 3 | 123 | 5 | 519 | 16 |
| Commercial | 431 | 23 | 588 | 24 | 1,173 | 35 |
| Other (a) (b) | 133 | 7 | 275 | 11 | 127 | 4 |
| Total | $1,892 | 100 | $2,455 | 100 | $3,292 | 100 |

(a) Includes regulatory over- or under-recovery reconciliation mechanisms, pole attachment revenues, street lighting and net transmission revenues.

(b) Included in these amounts for 2011, 2010 and 2009 are $11 million, $7 million and $74 million of retail and wholesale electric to affiliate revenue which is eliminated in consolidation for PPL.

#### Franchise, Licenses and Other Regulations

PPL Electric is authorized to provide electric public utility service throughout its service area as a result of grants by the Commonwealth of Pennsylvania in corporate charters to PPL Electric and companies to which it has succeeded and as a result of certification by the PUC. PPL Electric is granted the right to enter the streets and highways by the Commonwealth subject to certain conditions. In general, such conditions have been met by ordinance, resolution, permit, acquiescence or other action by an appropriate local political subdivision or agency of the Commonwealth.

#### Competition

Pursuant to authorizations from the Commonwealth of Pennsylvania and the PUC, PPL Electric operates a regulated transmission and distribution monopoly in its service area. Accordingly, PPL Electric does not face competition in its electricity transmission and distribution businesses.

#### Rates and Regulation

#### Transmission and Distribution

PPL Electric's transmission facilities are within PJM, which operates the electric transmission network and electric energy market in the Mid-Atlantic and Midwest regions of the U.S.

PJM serves as a FERC-approved RTO to promote greater participation and competition in the region it serves. In addition to operating the electric transmission network, PJM also administers regional markets for energy, capacity and ancillary services. A primary objective of any RTO is to separate the operation of, and access to, the transmission grid from market participants that buy or sell electricity in the same markets. Electric utilities continue to own the transmission assets and to receive their share of transmission revenues, but the RTO directs the control and operation of the transmission facilities. PPL Electric is entitled to fully recover from customers the charges that it pays to PJM for transmission-related services.

PPL Electric's transmission revenues are billed in accordance with a FERC tariff that allows recovery of transmission costs incurred, a return on transmission-related plant and an automatic annual update.

PPL Electric's distribution base rates are calculated based on a return on rate base (net utility plant plus a cash working capital allowance less plant-related deferred taxes and other miscellaneous additions and deductions). In November 2004, Pennsylvania enacted the Alternative Energy Portfolio Standard Act (the AEPS), which requires electricity distribution companies and electricity generation suppliers, to obtain a portion of the electricity sold to retail customers in Pennsylvania from alternative energy sources. Under the default service procurement plans approved by the PUC, PPL Electric purchases all of the alternative energy generation supply it needs to comply with the AEPS.

Act 129 became effective in October 2008. The law creates an energy efficiency and conservation program, a demand side management program, smart metering technology requirements, new PLR generation supply procurement rules, remedies for market misconduct, and changes to the existing AEPS.

See "Regulatory Matters - Pennsylvania Activities" in Note 6 to the Financial Statements for additional information regarding Act 129, other legislative and regulatory impacts and PPL Electric's actions to provide default electricity supply for periods after 2009.

#### PLR

The Customer Choice Act requires electric distribution companies, including PPL Electric, to act as a PLR of electricity supply and provides that electricity supply costs will be recovered by such companies pursuant to regulations established by the PUC. As part of the PUC Final Order, PPL Electric agreed to supply this electricity at predetermined capped rates through 2009. To mitigate the risk that PPL Electric would not be able to obtain adequate energy supply at the "capped" rates, PPL Electric entered into full-requirement energy supply contracts with PPL EnergyPlus sufficient for PPL Electric to meet its PLR obligation through the end of 2009. Under these contracts, PPL EnergyPlus supplied PPL Electric's entire PLR load at predetermined prices equal to the capped generation rates that PPL Electric was authorized to charge its customers. Prior to the expiration of the rate caps, PPL Electric's customers had limited incentive to purchase generation supply from other providers because the contracts between PPL Electric and PPL EnergyPlus provided a below-market price for these customers. As a result, a limited amount of "shopping" occurred. Since the expiration of the rate caps, shopping has increased and at December 31, 2011, the following percentages of PPL Electric's customer load were shopping: 43% of residential, 82% of small commercial and industrial and 99% of large commercial and industrial customers. The PUC continues to be interested in the competitive market for electricity. See "Regulatory Matters - Pennsylvania Activities" in Note 6 to the Financial Statements for additional information.

PPL Electric's PLR obligation after 2009 is governed by the PUC pursuant to the Public Utility Code as amended by Act 129, PLR regulations and a policy statement regarding interpretation and implementation of those regulations. Effective January 1, 2010, PPL Electric's cost of electric generation is based on a competitive solicitation process. The PUC has approved PPL Electric's default service plan for the period January 2011 through May 2013, which includes 14 solicitations for supply beginning January 1, 2011 with a portion extending beyond May 2013. Pursuant to this plan, PPL Electric contracts for all of the electricity supply for residential, small commercial and small industrial customers, large commercial and large industrial customers who elect to take that service from PPL Electric. These solicitations include a mix of spot market purchases and long-term and short-term purchases ranging from five months to ten years to fulfill PPL Electric's obligation to provide customer supply as a PLR. To date, PPL Electric has conducted ten of its 14 planned competitive solicitations. See "Energy Purchase Commitments" in Note 15 to the Financial Statements for additional information regarding PPL Electric's solicitations for 2011 and its actions to provide default electricity supply for periods after 2011.

In addition, alternative suppliers have offered to provide generation supply in PPL Electric's service territory. Whether its customers purchase supply from these alternative suppliers or from PPL Electric as a PLR, the purchase of such supply has no impact on the financial results of PPL Electric. The cost to purchase PLR supply is passed directly by PPL Electric to its customers without markup.

#### 2010 Rate Case

In March 2010, PPL Electric filed a request with the PUC to increase distribution rates by approximately $115 million or approximately 2.4% over PPL Electric's projected 2010 revenues, to be effective January 1, 2011. In December 2010, the PUC approved a settlement filed by the parties that provides for a rate increase of $77.5 million, or 1.6%, over PPL Electric's projected 2010 revenues. The approved rates became effective for service rendered on and after January 1, 2011. In January 2011, the PP&L Industrial Customers Alliance (PPLICA) filed a Petition for Reconsideration of the PUC's order regarding PPLICA's proposal for a special rate schedule for certain large commercial and industrial customers. The PUC granted reconsideration and assigned the case to an Administrative Law Judge. Hearings were held in September 2011. In January 2012, the Administrative Law Judge issued a recommended decision that the PUC deny PPLICA's proposal. PPLICA filed exceptions to the recommended decision. PPL Electric will file reply exceptions.

#### FERC Formula Rates

In March 2012, PPL Electric plans to file a request with the FERC seeking recovery, over a 34-year period beginning in June 2012, of its unrecovered regulatory asset related to the deferred state tax liability that existed at the time of the transition from the flow-through treatment of state income taxes to full normalization. This change in tax treatment occurred in 2008 as a result of prior FERC initiatives which transferred regulatory jurisdiction of certain transmission assets from the PUC to the FERC. A regulatory asset of $51 million related to this transition, classified as taxes recoverable through future rates, is included in "Other Noncurrent Assets - Regulatory assets" on the Balance Sheet. PPL Electric believes recoverability of this regulatory asset is probable based on FERC precedent in similar cases; however, it is reasonably possible that the FERC may limit the recovery of all or part of the claimed asset.

See Note 6 to the Financial Statements for additional information on rate mechanisms.

#### (PPL and PPL Energy Supply)

|  |  |
| --- | --- |
| · | **Supply Segment** |
|  | Owns and operates competitive domestic power plants to generate electricity; markets and trades this electricity, purchased power, and other energy-related products to competitive wholesale and retail markets; and acquires and develops competitive domestic generation projects. Consists primarily of the activities of PPL Generation and PPL EnergyPlus. |

PPL Energy Supply has generation assets that are located in the northeastern and northwestern U.S. markets. The northeastern generating capacity is located primarily in Pennsylvania within PJM and northwestern generating capacity is located in Montana. PPL Energy Supply enters into energy and energy-related contracts to hedge the variability of expected cash flows associated with their generating units and marketing activities, as well as for trading purposes. PPL EnergyPlus sells the electricity produced by PPL Energy Supply's generation plants based on prevailing market rates.

Details of revenue by category for the years ended December 31, are shown below.

| Energy | 2011 Revenue | % of Revenue | 2010 Revenue | % of Revenue | 2009 Revenue | % of Revenue |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Wholesale (a) | $5,240 | 82 | $4,347 | 85 | $4,761 | 90 |
| Retail | 727 | 11 | 415 | 8 | 152 | 3 |
| Trading | (2) |  | 2 |  | 17 |  |
| Total energy | 5,965 | 93 | 4,764 | 93 | 4,930 | 93 |
| Energy-related businesses (b) | 464 | 7 | 364 | 7 | 379 | 7 |
| Total | $6,429 | 100 | $5,128 | 100 | $5,309 | 100 |

(a) Included in these amounts for 2011, 2010, and 2009 are $26 million, $320 million and $1.8 billion of wholesale electric sales to an affiliate which are eliminated in consolidation for PPL.

(b) Energy-related businesses revenues include activities that primarily support the generation, marketing and trading businesses. These activities include developing renewable energy projects and providing energy-related products and services to commercial and industrial customers through its mechanical contracting and services subsidiaries. In addition to these amounts, for 2011, 2010, and 2009, PPL has $8 million, $11 million and $12 million of revenue which is not applicable to PPL Energy Supply.

#### Power Supply

PPL Energy Supply owned or controlled generating capacity (summer rating) of 10,508 MW at December 31, 2011. The system capacity of PPL Energy Supply's owned or controlled generation is based upon a number of factors, including the operating experience and physical condition of the units, and may be revised periodically to reflect changes in circumstances. Generating capacity controlled by PPL Generation and other PPL Energy Supply subsidiaries includes power obtained through PPL EnergyPlus' tolling or power purchase agreements (including Ironwood and other facilities that consist of NUGs, wind farms and landfill gas facilities). See "Item 2. Properties - Supply Segment" for a complete listing of PPL Energy Supply's generating capacity.

During 2011, PPL Energy Supply's power plants, excluding renewable facilities that are discussed separately below, generated the following amounts of electricity.

| Fuel Source | Thousands of MWhs Northeastern | Northwestern | Total |
| --- | ---: | ---: | ---: |
| Nuclear | 15,627 |  | 15,627 |
| Oil / Gas (a) | 9,033 |  | 9,033 |
| Coal | 21,612 | 3,842 | 25,454 |
| Hydro (a) | 682 | 3,697 | 4,379 |
| Total (b) | 46,954 | 7,539 | 54,493 |

(a) Northeastern includes generation from certain non-core generation facilities that were sold in March 2011. See Note 9 to the Financial Statements for additional information.

(b) This generation represents a 4% decrease from 2010 output, largely attributable to PPL Susquehanna's dual-unit turbine blade replacement outages and economic reductions in coal unit output in the western U.S. in 2011.

PPL Energy Supply's generation subsidiaries are EWGs that sell electricity into wholesale markets. EWGs are subject to regulation by the FERC, which has authorized these EWGs to sell the electricity generated at market-based prices. This electricity is sold to PPL EnergyPlus under FERC-jurisdictional power purchase agreements. PPL Susquehanna is subject to the jurisdiction of the NRC in connection with the operation of the Susquehanna nuclear units. Certain of PPL Energy Supply's other subsidiaries are subject to the jurisdiction of the NRC in connection with the operation of their fossil plants with respect to certain level and density monitoring devices. Certain operations of PPL Generation's subsidiaries are also subject to OSHA and comparable state statutes.

See Note 9 to the Financial Statements for information on the 2011 sale of certain non-core generation facilities consisting of natural gas-fired facilities in Wallingford, Connecticut and University Park, Illinois and an equity interest in Safe Harbor Water Power Corporation, which owns a hydroelectric facility in Conestoga, Pennsylvania, the 2010 sale of the Long Island Generation business, consisting of plants in New York and the 2010 and 2009 sales of hydroelectric facilities located in Maine.

Substantially all of PPL Energy Supply's total expected generation in 2012 is anticipated to be used to meet its committed contractual sales. PPL Energy Supply has also entered into commitments of varying quantities and terms for the years 2013 and beyond. PPL EnergyPlus purchases the capacity, energy and RECs from two wind farms in Pennsylvania with a combined installed capacity of 50 MW. These contracts extend through 2027.

PPL Energy Supply subsidiaries own or control renewable energy projects located in Pennsylvania, New Jersey, Vermont, Connecticut and New Hampshire with a generating capacity (summer rating) of 65 MW. PPL EnergyPlus sells the energy, capacity and RECs produced by these plants into the wholesale market as well as to commercial, industrial and institutional customers. During 2011, the projects owned and operated by these PPL Energy Supply subsidiaries generated 166,000 MWhs.

See "Item 2. Properties - Supply Segment" for additional information regarding PPL Generation's plans for capital projects in Pennsylvania, Montana, and New Jersey that are expected to provide 191 MW of additional electric generating capacity by 2013.

#### Fuel Supply

PPL EnergyPlus acts as agent for PPL Generation to procure and optimize its various fuels.

#### Coal

#### Pennsylvania

PPL EnergyPlus actively manages PPL's coal requirements by purchasing coal principally from mines located in central and northern Appalachia.

During 2011, PPL Generation purchased 7.1 million tons of coal required for its wholly owned Pennsylvania plants under short-term and long-term contracts. Contracts currently in place are expected to provide 7.9 million tons of coal in 2012. The amount of coal in inventory varies from time to time depending on market conditions and plant operations.

PPL Generation, by and through its agent PPL EnergyPlus, has agreements in place that will provide more than 31 million tons of PPL Generation's projected annual coal needs for the Pennsylvania power plants from 2012 through 2018.

A PPL Generation subsidiary owns a 12.34% interest in the Keystone plant and a 16.25% interest in the Conemaugh plant. PPL Generation owns a 12.34% interest in Keystone Fuels, LLC and a 16.25% interest in Conemaugh Fuels, LLC. The Keystone plant contracts with Keystone Fuels, LLC for its coal requirements, which provided 4.4 million tons of coal to the Keystone plant in 2011. The Conemaugh plant requirements are purchased under contract from Conemaugh Fuels, LLC, which provided 4.5 million tons of coal to the Conemaugh plant in 2011.

All PPL Generation Pennsylvania coal plants have scrubbers installed. Limestone is necessary to operate the scrubbers. Acting as agent for PPL Brunner Island, LLC and PPL Montour, LLC, PPL EnergyPlus has entered into long-term contracts with limestone suppliers that will provide for those plants' limestone requirements through 2014. During 2011, 529,000 tons of limestone were delivered to Brunner Island and Montour under long-term contracts. Annual limestone requirements approximate 600,000 tons.

#### Montana

PPL Montana has a 50% leasehold interest in Colstrip Units 1 and 2, and a 30% leasehold interest in Colstrip Unit 3. NorthWestern owns a 30% leasehold interest in Colstrip Unit 4. PPL Montana and NorthWestern have a sharing agreement to govern each party's responsibilities regarding the operation of Colstrip Units 3 and 4, and each party is responsible for 15% of the respective operating and construction costs, regardless of whether a particular cost is specified to Colstrip Unit 3 or 4. However, each party is responsible for its own fuel-related costs. PPL Montana, along with the other owners, is party to contracts to purchase 100% of its coal requirements with defined coal quality characteristics and specifications. PPL Montana, along with the other owners, has a long-term purchase and supply agreement with the current supplier for Units 1 and 2, which provides these units 100% of their coal requirements through December 2014, and at least 85% of such requirements from January 2015 through December 2019. The coal supply contract for Unit 3's requirements is in effect through December 2019.

These units were built with scrubbers and PPL Montana has entered into a long-term contract to purchase the lime requirements for these units. The contract extends through December 2030.

Coal supply contracts are in place to purchase low-sulfur coal with defined quality characteristics and specifications for PPL Montana's Corette plant. The contracts covered 100% of the plant's coal requirements in 2011, and similar contracts are in place to supply 100% of the expected coal requirements through 2012.

#### Oil and Natural Gas

#### Pennsylvania

PPL Generation's Martins Creek Units 3 and 4 burn both oil and natural gas. During 2011, 100% of the physical gas requirements for the Martins Creek units were purchased on the spot market while oil requirements were supplied from inventory. At December 31, 2011, there were no long-term agreements for oil or natural gas for these units.

Short-term and long-term gas transportation contracts are in place for approximately 38% of the maximum daily requirements of the Lower Mt. Bethel facility. During 2011, 100% of the physical gas requirements for Lower Mt. Bethel were purchased on the spot market.

In 2008, PPL EnergyPlus acquired the rights to an existing long-term tolling agreement associated with the capacity and energy of the Ironwood facility. PPL EnergyPlus has long-term transportation contracts to serve approximately 25% of Ironwood's maximum daily requirements, which began in the fourth quarter of 2010. Ironwood will be served through a combination of transportation capacity release transactions and delivered supply to the plant. PPL EnergyPlus currently has no long-term physical supply agreements to purchase natural gas for Ironwood. During 2011, 100% of the physical gas requirements for Ironwood were purchased on the spot market.

#### Nuclear

The nuclear fuel cycle consists of several material and service components: the mining and milling of uranium ore to produce uranium concentrates; the conversion of these concentrates into uranium hexafluoride, a gas component; the enrichment of the hexafluoride gas; the fabrication of fuel assemblies for insertion and use in the reactor core; and the temporary storage and final disposal of spent nuclear fuel.

PPL Susquehanna has a portfolio of supply contracts, with varying expiration dates, for nuclear fuel materials and services. These contracts are expected to provide sufficient fuel to permit Unit 1 to operate into the first quarter of 2016 and Unit 2 to operate into the first quarter of 2017. PPL Susquehanna anticipates entering into additional contracts to ensure continued operation of the nuclear units.

Federal law requires the U.S. government to provide for the permanent disposal of commercial spent nuclear fuel, but there is no definitive date by which a repository will be operational. As a result, it was necessary to expand Susquehanna's on-site spent fuel storage capacity. To support this expansion, PPL Susquehanna contracted for the design and construction of a spent fuel storage facility employing dry cask fuel storage technology. The facility is modular, so that additional storage capacity can be added as needed. The facility began receiving spent nuclear fuel in 1999. PPL Susquehanna estimates that there is sufficient storage capacity in the spent nuclear fuel pools and the on-site spent fuel storage facility at Susquehanna to accommodate spent fuel discharged through approximately 2017 under current operating conditions. If necessary, the on-site spent fuel storage facility can be expanded, assuming appropriate regulatory approvals are obtained, such that, together, the spent fuel pools and the expanded dry fuel storage facility will accommodate all of the spent fuel expected to be discharged through the current licensed life of the plant.

In 1996, the U.S. Court of Appeals for the District of Columbia Circuit (D.C. Circuit Court) ruled that the Nuclear Waste Policy Act imposed on the DOE an unconditional obligation to begin accepting spent nuclear fuel on or before January 31, 1998. In 1997, the D.C. Circuit Court ruled that the contracts between the utilities and the DOE provide a potentially adequate remedy if the DOE failed to begin accepting spent nuclear fuel by January 31, 1998. The DOE did not, in fact, begin to accept spent nuclear fuel by that date. The DOE continues to contest claims that its breach of contract resulted in recoverable damages. In January 2004, PPL Susquehanna filed suit in the U.S. Court of Federal Claims for unspecified damages suffered as a result of the DOE's breach of its contract to accept and dispose of spent nuclear fuel. In May 2011, the parties entered into a settlement agreement which resolved all claims of PPL Susquehanna through December 2013. Under the settlement agreement, PPL Susquehanna received $50 million for its share of claims to recover costs to store spent nuclear fuel at the Susquehanna plant through September 30, 2009, and recognized a credit to "Fuel" expense in the Statement of Income in the second quarter of 2011. PPL Susquehanna also will be eligible to receive payment of annual claims for allowed costs, as set forth in the settlement agreement, that are incurred thereafter through the December 31, 2013 termination date of the settlement agreement. In exchange, PPL Susquehanna has waived any claims against the United States government for costs paid or injuries sustained related to storing spent nuclear fuel at the Susquehanna plant through December 31, 2013.

#### Energy Marketing

PPL EnergyPlus sells the capacity and electricity produced by PPL Generation subsidiaries, along with purchased power, FTRs, natural gas, oil, uranium, emission allowances and RECs in competitive wholesale and competitive retail markets.

Purchases and sales at the wholesale level are made at competitive prices under FERC market-based prices. PPL EnergyPlus is licensed to provide retail electric supply to customers in Delaware, Maryland, Montana, New Jersey and Pennsylvania and provides retail natural gas supply to customers in Pennsylvania, New Jersey, Delaware and Maryland. Within the constraints of its hedging policy, PPL EnergyPlus actively manages its portfolios of energy and energy-related products to optimize their value and to limit exposure to price fluctuations. See "Commodity Volumetric Activity" in Note 19 to the Financial Statements for the strategies PPL Energy Supply employs to optimize the value of its wholesale and retail energy portfolio.

#### Competition

Since the early 1990s, there has been increased competition in U.S. energy markets because of federal and state competitive market initiatives. While some states, such as Pennsylvania and Montana, have created a competitive market for electricity generation, other states continue to consider different types of regulatory initiatives concerning competition in the power and gas industry. Some states that were considering creating competitive markets have slowed their plans or postponed further consideration. In addition, states that have created competitive markets have, from time to time, considered new market rules and re-regulation measures that could result in more limited opportunities for competitive energy suppliers. The activity around re-regulation, however, has slowed due to the current environment of declining power prices. As such, the markets in which PPL Energy Supply participates are highly competitive.

PPL Energy Supply faces competition in wholesale markets for available energy, capacity and ancillary services. Competition is impacted by electricity and fuel prices, congestion along the power grid, new market entrants, construction by others of generating assets, technological advances in power generation, the actions of environmental and other regulatory authorities and other factors. PPL Energy Supply primarily competes with other electricity suppliers based on its ability to aggregate generation supply at competitive prices from different sources and to efficiently utilize transportation from third-party pipelines and transmission from electric utilities and ISOs. Competitors in wholesale power markets include regulated utilities, industrial companies, NUGs, competitive subsidiaries of regulated utilities and other energy marketers. See "Item 1A. Risk Factors - Risks Related to Supply Segment" and PPL's and PPL Energy Supply's "Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations - Overview" for more information concerning the risks faced with respect to competitive energy markets.

#### Franchise and Licenses

See "Energy Marketing" above for a discussion of PPL EnergyPlus' licenses in various states. PPL EnergyPlus also has an export license from the DOE to sell capacity and/or energy to electric utilities in Canada.

PPL Susquehanna operates Units 1 and 2 pursuant to NRC operating licenses that expire in 2042 for Unit 1 and in 2044 for Unit 2.

In 2008, a PPL Energy Supply subsidiary, PPL Bell Bend, LLC, submitted a COLA to the NRC for a new nuclear generating unit (Bell Bend) to be built adjacent to the Susquehanna plant. Also in 2008, the COLA was accepted for review by the NRC. PPL Bell Bend, LLC does not expect the NRC review of the Bell Bend project to be completed prior to 2014. See Note 8 to Financial Statements for additional information.

PPL Holtwood operates the Holtwood hydroelectric generating plant pursuant to a FERC-granted license that expires in 2030. In October 2009, the FERC approved the request to expand the Holtwood plant. See Note 8 to the Financial Statements for additional information. PPL Holtwood operates the Wallenpaupack hydroelectric generating plant pursuant to a FERC-granted license that expires in 2044.

In 2010, PPL Holtwood owned one-third of the capital stock of Safe Harbor Water Power Corporation (Safe Harbor), which held a project license that would extend operation of its hydroelectric generating plant until 2030. In March 2011, PPL Energy Supply subsidiaries completed the sale of their ownership interests in Safe Harbor and two other non-core generating facilities. See Note 9 to the Financial Statements for additional information.

The 11 hydroelectric facilities and one storage reservoir in Montana are licensed by the FERC. The Thompson Falls and Kerr licenses expire in 2025 and 2035, the licenses for the nine Missouri-Madison facilities expire in 2040, and the license for the Mystic facility expires in 2050.

In connection with the relicensing of these generating facilities, applicable law permits the FERC to relicense the original licensee or license a new licensee or allow the U.S. government to take over the facility. If the original licensee is not relicensed, it is compensated for its net investment in the facility, not to exceed the fair value of the property taken, plus reasonable damages to other property affected by the lack of relicensing. See Note 15 to the Financial Statements for additional information on the Kerr Dam license.

#### (PPL, PPL Energy Supply, PPL Electric, LKE, LG&E and KU)

### SEASONALITY

The demand for and market prices of electricity and natural gas are affected by weather. As a result, the Registrants' operating results in the future may fluctuate substantially on a seasonal basis, especially when more severe weather conditions such as heat waves or winter storms make such fluctuations more pronounced. The pattern of this fluctuation may change depending on the type and location of the facilities owned and the terms of contracts to purchase or sell electricity.

### FINANCIAL CONDITION

See the Registrant's "Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations" for this information.

### CAPITAL EXPENDITURE REQUIREMENTS

See "Financial Condition - Liquidity and Capital Resources - Forecasted Uses of Cash - Capital Expenditures" in the Registrants' "Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations" for information concerning projected capital expenditure requirements for 2012 through 2016. See Note 15 to the Financial Statements for additional information concerning the potential impact on capital expenditures from environmental matters.

### ENVIRONMENTAL MATTERS

The Registrants are subject to certain existing and developing federal, regional, state and local laws and regulations with respect to air and water quality, land use and other environmental matters. The EPA is in the process of proposing and finalizing an unprecedented number of environmental regulations that will directly affect the electric industry. These initiatives cover air, water and waste. See PPL's, PPL Energy Supply's, LKE's, LG&E's and KU's "Financial Condition - Liquidity and Capital Resources" in "Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations - Forecasted Uses of Cash - Capital Expenditures" for information concerning environmental capital expenditures during 2011 and projected environmental capital expenditures for the years 2012-2016. Also, see "Environmental Matters" in Note 15 to the Financial Statements for additional information. To comply with primarily air-related environmental requirements, PPL's forecast for capital expenditures reflects a best estimate projection of expenditures that may be required within the next five years. Such projections are $1.6 billion for LG&E, $1.5 billion for KU and $130 million for PPL Energy Supply. Actual costs (including capital, allowance purchases and operational modifications) may be significantly lower or higher depending on the final requirements and market conditions. Environmental compliance costs incurred by LG&E and KU are subject to recovery through a rate recovery mechanism. See Note 6 to the Financial Statements for additional information.

The Registrants are unable to predict the ultimate effect of evolving environmental laws and regulations upon their existing and proposed facilities and operations and competitive positions. In complying with statutes, regulations and actions by regulatory bodies involving environmental matters, including, among other things, air and water quality, GHG emissions, hazardous and solid waste management and disposal, and regulation of toxic substances, PPL's and LKE's subsidiaries may be required to modify, replace or cease operating certain of their facilities. PPL's and LKE's subsidiaries may also incur significant capital expenditures and operating expenses in amounts which are not now determinable, but could be significant.

### EMPLOYEE RELATIONS

At December 31, 2011, PPL and its subsidiaries had the following full-time employees.

| PPL Energy Supply |  |
| --- | ---: |
| PPL Generation | 2,812 |
| PPL EnergyPlus (a) | 1,864 |
| Total PPL Energy Supply | 4,676 |
| PPL Electric | 2,304 |
| LKE |  |
| KU | 940 |
| LG&E | 966 |
| LKS | 1,285 |
| Total LKE | 3,191 |
| PPL Global (primarily WPD) | 6,264 |
| PPL Services and other | 1,287 |
| Total PPL | 17,722 |

(a) Includes labor union employees of mechanical contracting subsidiaries, whose numbers tend to fluctuate due to the nature of this business.

Approximately 5,600 employees, or 49%, of PPL's domestic workforce are members of labor unions, with four International Brotherhood of Electrical Workers (IBEW) labor unions representing approximately 4,300 employees. The bargaining agreement with the largest IBEW labor union, which expires in May 2014, covers approximately 1,500 PPL Electric, 1,600 PPL Energy Supply and 400 other employees. Approximately 700 employees of LG&E and 70 employees of KU are represented by an IBEW labor union. Both LG&E and KU have three-year labor agreements with the IBEW, which expire in November 2014 and August 2012. KU's agreement includes annual wage reopeners. Approximately 80 employees of KU are represented by a United Steelworkers of America (USWA) labor union. KU and the USWA have agreed in principle on a labor agreement effective through August 2014, which was ratified by the members in February 2012. PPL Montana's largest bargaining unit, an IBEW labor union, represents approximately 270 employees at the Colstrip plant. The four-year labor agreement expires in April 2012. PPL Montana's second largest bargaining unit, also an IBEW labor union, represents approximately 80 employees at hydroelectric facilities and the Corette plant. In 2011, this four-year labor agreement was extended one year and expires in April 2013.

Approximately 4,100 or 65%, of PPL's U.K. workforce are members of labor unions. WPD recognizes four unions, the largest of which represents 26% of its union workforce. WPD's Electricity Business Agreement, which covers approximately 4,000 union employees, may be amended by agreement between WPD and the unions and is terminable with 12 months notice by either side.

See "Separation Benefits - International Regulated Segment" in Note 10 to the Financial Statements for information on a 2011 reorganization designed to transition the WPD Midlands companies to the same operating structure as WPD (South West) and WPD (South Wales). See "Separation Benefits" in Note 13 to the Financial Statements for information on a 2009 cost reduction initiative, which resulted in the elimination of approximately 200 domestic management and staff positions at PPL.

### AVAILABLE INFORMATION

PPL's Internet website is www.pplweb.com. On the Investor Center page of that website, PPL provides access to all SEC filings of the Registrants (including annual reports on Form 10-K, quarterly reports on Form 10-Q, current reports on Form 8-K, and amendments to these reports filed or furnished pursuant to Section 13(d) or 15(d)) free of charge, as soon as reasonably practicable after filing with the SEC. Additionally, the Registrants' filings are available at the SEC's website (www.sec.gov) and at the SEC's Public Reference Room at 100 F Street, NE, Washington, DC 20549, or by calling 1-800-SEC-0330.

## Risk factors

As filed, 63,739 characters.

The Registrants face various risks associated with their businesses. Our businesses, financial condition, cash flows or results of operations could be materially adversely affected by any of these risks. In addition, this report also contains forward-looking and other statements about our businesses that are subject to numerous risks and uncertainties. See "Forward-Looking Information," "Item 1. Business," "Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations" and Note 15 to the Financial Statements for more information concerning the risks described below and for other risks, uncertainties and factors that could impact our businesses and financial results.

As used in this Item 1A., the terms "we," "our" and "us" generally refer to PPL and its consolidated subsidiaries taken as a whole, or to PPL Energy Supply and its consolidated subsidiaries taken as a whole within the Supply segment discussions, or PPL Electric and its consolidated subsidiaries taken as a whole within the Pennsylvania Regulated segment discussion, or LKE and its consolidated subsidiaries taken as a whole within the Kentucky Regulated segment discussion.

### Risks Related to All Segments

(*PPL, PPL Energy Supply, PPL Electric, LKE, LG&E and KU)*

***We plan to selectively pursue growth of generation, transmission and distribution capacity, which involves a number of uncertainties and may not achieve the desired financial results.***

We plan to pursue expansion of our generation, transmission and distribution capacity over the next several years through power uprates at certain of our existing power plants, the potential construction of new power plants, the potential acquisition of existing plants, the potential construction or acquisition of transmission and distribution projects and capital investments to upgrade transmission and distribution infrastructure. We will rigorously scrutinize opportunities to expand our generating capability and may determine not to proceed with any expansion. These types of projects involve numerous risks. Any planned power uprates could result in cost overruns, reduced plant efficiency and higher operating and other costs. With respect to the construction of new plants, the acquisition of existing plants, or the construction or acquisition of transmission and distribution projects, we may be required to expend significant sums for preliminary engineering, permitting, resource exploration, legal and other expenses before it can be established whether a project is feasible, economically attractive or capable of being financed. Expansion in our regulated businesses is dependent on future load or service requirements and subject to applicable regulatory processes. The success of both a new or acquired project would likely be contingent, among other things, upon the negotiation of satisfactory operating contracts, obtaining acceptable financing and maintaining acceptable credit ratings, as well as receipt of required and appropriate governmental approvals. If we were unable to complete construction or expansion of a project, we may not be able to recover our investment in the project. Furthermore, we might be unable to operate any new or acquired plants as efficiently as projected, which could result in higher than projected operating and other costs and reduced earnings.

***Adverse conditions in the economic and financial markets in which we operate could adversely affect our financial condition and results of operations.***

Adverse conditions in the financial markets during 2008 and the associated contraction of liquidity in the wholesale energy markets contributed significantly to declines in wholesale energy prices, significantly impacting our earnings during the second half of 2008 and the first half of 2009. The breadth and depth of these negative economic conditions had a wide-ranging impact on the U.S. and international business environment, including our businesses. As a result of the economic downturn, demand for energy commodities has declined significantly. This reduced demand will continue to impact the key domestic wholesale energy markets we serve (such as PJM) and our Pennsylvania and Kentucky utility businesses. The combination of lower demand for power and natural gas and other fuels has put downward price pressure on wholesale energy markets in general, further impacting our energy marketing results. In general, current economic and commodity market conditions will continue to challenge predictability regarding our unhedged future energy margins, liquidity and overall financial condition.

Our businesses are heavily dependent on credit and capital, among other things, for capital expenditures and providing collateral to support hedging in our energy marketing business. Global bank credit capacity declined and the cost of renewing or establishing new credit facilities increased significantly in 2008, primarily as a result of general credit concerns nationwide, thereby introducing uncertainties as to our businesses' ability to enter into long-term energy commitments or reliably estimate the longer-term cost and availability of credit. Although bank credit conditions have improved since mid-2009, and we currently expect to have adequate access to needed credit and capital based on current conditions, deterioration in the financial markets could adversely affect our financial condition and liquidity. Additionally, regulations to be adopted to implement the Dodd-Frank Act may impose requirements on our businesses and the businesses of others with whom we contract such as banks or other counterparties, or simply result in increased costs to conduct our business or access sources of capital and liquidity upon which the conduct of our businesses is dependent.

***Our operating revenues could fluctuate on a seasonal basis, especially as a result of extreme weather conditions.***

Our businesses are subject to seasonal demand cycles. For example, in some markets demand for, and market prices of, electricity peak during hot summer months, while in other markets such peaks occur in cold winter months. As a result, our overall operating results in the future may fluctuate substantially on a seasonal basis if weather conditions such as heat waves, extreme cold, unseasonably mild weather or severe storms occur. The patterns of these fluctuations may change depending on the type and location of our facilities and the terms of our contracts to sell electricity.

***Operating expenses could be affected by weather conditions, including storms, as well as by significant man-made or accidental disturbances, including terrorism or natural disasters.***

Weather and these other factors can significantly affect our profitability or operations by causing outages, damaging infrastructure and requiring significant repair costs. Storm outages and damage often directly decrease revenues or increase expenses, due to reduced usage and higher restoration charges. In addition, weather and other disturbances may affect capital markets and general economic conditions and impact future growth.

***Our businesses are subject to physical, market and economic risks relating to potential effects of climate change.***

Climate change may produce changes in weather or other environmental conditions, including temperature or precipitation levels, and thus may impact consumer demand for electric power. Temperature increases could result in increased overall electricity consumption or peaks and precipitation changes could result in altered availability of water for hydro generation or plant cooling operations. These or other meteorological changes could lead to increased operating costs, capital expenses or power purchase costs. Greenhouse gas regulation could increase the cost of electric power, particularly power generated by fossil-fuels, and such increases could have a depressive effect on regional economies. Reduced economic and consumer activity in our service areas -- both generally and specific to certain industries and consumers accustomed to previously lower cost power -- could reduce demand for the power we generate, market and deliver. Also, demand for our energy-related services could be similarly lowered should consumers' preferences or market factors move toward favoring energy efficiency, low-carbon power sources or reduced electric usage generally.

***We cannot predict the outcome of the legal proceedings and investigations currently being conducted with respect to our current and past business activities. An adverse determination could have a material adverse effect on our financial condition, results of operations or cash flows.***

We are involved in legal proceedings, claims and litigation and subject to ongoing state and federal investigations arising out of our business operations, the most significant of which are summarized in "Legal Matters," "Regulatory Issues" and "Environmental Matters - Domestic" in Note 15 to the Financial Statements. We cannot predict the ultimate outcome of these matters, nor can we reasonably estimate the costs or liabilities that could potentially result from a negative outcome in each case.

***We could be negatively affected by rising interest rates, downgrades to our bond credit ratings or other negative developments in our ability to access capital markets.***

In the ordinary course of business, we are reliant upon adequate long-term and short-term financing means to fund our significant capital expenditures, debt interest or maturities and operating needs. As a capital-intensive business, we are sensitive to developments in interest rate levels; credit rating considerations; insurance, security or collateral requirements; market liquidity and credit availability and refinancing opportunities necessary or advisable to respond to credit market changes. Changes in these conditions could result in increased costs and decreased liquidity to our regulated utility businesses.

***A downgrade in our credit ratings could negatively affect our ability to access capital and increase the cost of maintaining our credit facilities and any new debt.***

Credit ratings assigned by Moody's, Fitch and S&P to our businesses and their financial obligations have a significant impact on the cost of capital incurred by our businesses. Although we do not expect these ratings to limit our ability to fund short-term liquidity needs or access new long-term debt, any ratings downgrade could increase our short-term borrowing costs and negatively affect our ability to fund short-term liquidity needs and access new long-term debt. See "Item 7. Management's

Discussion and Analysis of Financial Condition and Results of Operations - Financial Condition - Liquidity and Capital Resources - Ratings Triggers" for additional information on the impact of a downgrade in our credit rating.

***Significant increases in our operation and maintenance expenses, including health care and pension costs, could adversely affect our future earnings and liquidity.***

We continually focus on limiting and reducing where possible our operation and maintenance expenses. However, we expect to continue to face increased cost pressures in our operations. Increased costs of materials and labor may result from general inflation, increased regulatory requirements (especially in respect of environmental regulations), the need for higher-cost expertise in the workforce or other factors. In addition, pursuant to collective bargaining agreements, we are contractually committed to provide specified levels of health care and pension benefits to certain current employees and retirees. We provide a similar level of benefits to our management employees. These benefits give rise to significant expenses. Due to general inflation with respect to such costs, the aging demographics of our workforce and other factors, we have experienced significant health care cost inflation in recent years, and we expect our health care costs, including prescription drug coverage, to continue to increase despite measures that we have taken and expect to take to require employees and retirees to bear a higher portion of the costs of their health care benefits. In addition, we expect to continue to incur significant costs with respect to the defined benefit pension plans for our employees and retirees. The measurement of our expected future health care and pension obligations, costs and liabilities is highly dependent on a variety of assumptions, most of which relate to factors beyond our control. These assumptions include investment returns, interest rates, health care cost trends, benefit improvements, salary increases and the demographics of plan participants. If our assumptions prove to be inaccurate, our future costs and cash contribution requirements to fund these benefits could increase significantly.

***We may be required to record impairment charges in the future for certain of our investments, which could adversely affect our earnings.***

Under GAAP, we are required to test our recorded goodwill for impairment on an annual basis, or more frequently if events or circumstances indicate that these assets may be impaired. Although no goodwill impairments were recorded based on our annual review in the fourth quarter of 2011, we are unable to predict whether future impairment charges may be necessary.

We also review our long-lived assets, including equity investments, for impairment when events or circumstances indicate that the carrying value of these assets may not be recoverable. See Notes 9 and 18 to the Financial Statements for additional information on impairment charges taken during the reporting periods. We are unable to predict whether impairment charges, or other losses on sales of other assets or businesses, may occur in future years.

### We may incur liabilities in connection with discontinued operations.

In connection with various divestitures, we have indemnified or guaranteed parties against certain liabilities and with respect to certain transactions. These indemnities and guarantees relate to, among other things, liabilities which may arise with respect to the period during which we or our subsidiaries operated the divested business, and to certain ongoing contractual relationships and entitlements with respect to which we or our subsidiaries made commitments in connection with the divestiture.

***We are subject to liability risks relating to our generation, transmission and distribution businesses.***

The conduct of our physical and commercial operations subjects us to many risks, including risks of potential physical injury, property damage or other financial liability, caused to or caused by employees, customers, contractors, vendors, contractual or financial counterparties and other third parties.

***Our facilities may not operate as planned, which may increase our expenses or decrease our revenues and, thus, have an adverse effect on our financial performance.***

Operation of power plants, transmission and distribution facilities, information technology systems and other assets and activities subjects us to a variety of risks, including the breakdown or failure of equipment, accidents, security breaches, viruses or outages affecting information technology systems, labor disputes, obsolescence, delivery/transportation problems and disruptions of fuel supply and performance below expected levels. These events may impact our ability to conduct our businesses efficiently or lead to increased costs, expenses or losses. Operation of our delivery systems below our expectations may result in lost revenue or increased expense, including higher maintenance costs which may not be recoverable from customers. Planned and unplanned outages at our power plants may require us to purchase power at then-current market prices to satisfy our commitments or, in the alternative, pay penalties and damages for failure to satisfy them.

Although we maintain customary insurance coverage for certain of these risks, no assurance can be given that such insurance coverage will be sufficient to compensate us fully in the event losses occur.

***The operation of our businesses is subject to cyber-based security and integrity risk.***

Numerous functions affecting the efficient operation of our businesses are dependent on the secure and reliable storage, processing and communication of electronic data and the use of sophisticated computer hardware and software systems. The operation of our generation plants, including the Susquehanna nuclear plant, and of our energy and fuel trading businesses, as well as our transmission and distribution operations are all reliant on cyber-based technologies and, therefore, subject to the risk that such systems could be the target of disruptive actions, principally by terrorists or vandals, or otherwise be compromised by unintentional events. As a result, operations could be interrupted, property could be damaged and customer information lost or stolen, causing us to incur significant losses of revenues, other substantial liabilities and damages and costs to replace or repair damaged equipment.

***We are subject to risks associated with federal and state tax laws and regulations.***

Changes in tax law as well as the inherent difficulty in quantifying potential tax effects of business decisions could negatively impact our results of operations. We are required to make judgments in order to estimate our obligations to taxing authorities. These tax obligations include income, property, sales and use and employment-related taxes. We also estimate our ability to utilize tax benefits and tax credits. Due to the revenue needs of the jurisdictions in which our businesses operate, various tax and fee increases may be proposed or considered. We cannot predict whether such tax legislation or regulation will be introduced or enacted or the effect of any such changes on our businesses. If enacted, any changes could increase tax expense and could have a significant negative impact on our results of operations and cash flows.

***We are subject to the risk that our workforce and its knowledge base may become depleted in coming years.***

PPL is experiencing an increase in attrition due primarily to the number of retiring employees. Over the next five years, 38% of PPL's workforce is projected to leave the company, with the risk that critical knowledge will be lost and that it may be difficult to replace departed personnel due to a declining trend in the number of available workers and an increase in competition for such workers.

#### (PPL, PPL Energy Supply and LKE)

### Risk Related to Registrant Holding Companies

***PPL's, PPL Energy Supply's and LKE's cash flows and ability to meet their obligations with respect to indebtedness and under guarantees, and PPL's ability to pay dividends, largely depends on the financial performance of their subsidiaries and, as a result, is effectively subordinated to all existing and future liabilities of those subsidiaries.***

PPL, PPL Energy Supply and LKE are holding companies and conduct their operations primarily through subsidiaries. Substantially all of the consolidated assets of these Registrants are held by such subsidiaries. Accordingly, their cash flows and ability to meet their debt and guaranty obligations, as well as PPL's ability to pay dividends, are largely dependent upon the earnings of those subsidiaries and the distribution or other payment of such earnings in the form of dividends, distributions, loans or advances or repayment of loans and advances. The subsidiaries are separate and distinct legal entities and have no obligation to pay any amounts due from their parents or to make any funds available for such a payment. The ability of the subsidiaries of the Registrants to pay dividends or distributions to such Registrants in the future will depend on the subsidiaries' future earnings and cash flows and the needs of their businesses, and may be restricted by their obligations to holders of their outstanding debt and other creditors, as well as any contractual or legal restrictions in effect at such time, including the requirements of state corporate law applicable to payment of dividends and distributions, and regulatory requirements, including restrictions on the ability of PPL Electric, LG&E and KU to pay dividends under Section 305(a) of the Federal Power Act.

Because PPL, PPL Energy Supply and LKE are holding companies, their debt and guaranty obligations are effectively subordinated to all existing and future liabilities of their subsidiaries. Therefore, PPL's, PPL Energy Supply's and LKE's rights and the rights of their creditors, including rights of any debt holders, to participate in the assets of any of their subsidiaries, in the event that such a subsidiary is liquidated or reorganized, will be subject to the prior claims of such subsidiary's creditors. Although certain agreements to which certain subsidiaries are parties limit their ability to incur additional indebtedness, PPL, PPL Energy Supply and LKE and their subsidiaries retain the ability to incur substantial additional indebtedness and other liabilities. In addition, if PPL elects to receive distributions of earnings from its foreign operations, PPL may incur U.S. income taxes, net of any available foreign tax credits, on such amounts. Distributions to PPL from its international projects are, in some countries, also subject to withholding taxes.

#### (PPL, PPL Electric, LKE, LG&E and KU)

### Risks Related to Domestic Regulated Utility Operations

Our domestic regulated utility businesses face many of the same risks, in addition to those risks that are unique to the Kentucky Regulated segment and the Pennsylvania Regulated segment. Set forth below are risk factors common to both domestic regulated segments, followed by sections identifying separately the risks specific to each of these segments.

***Our profitability is highly dependent on our ability to recover the costs of providing energy and utility services to our customers and earn an adequate return on our capital investments. Regulators may not approve the rates we request.***

We currently provide services to our utility customers at rates approved by one or more federal or state regulatory commissions, including those commissions referred to below. While such regulation is generally premised on the recovery of prudently incurred costs and a reasonable rate of return on invested capital, the rates that we may charge our regulated generation, transmission and distribution customers are subject to authorization of the applicable regulatory authorities. There can be no assurance that such regulatory authorities will consider all of our costs to have been prudently incurred or that the regulatory process by which rates are determined will always result in rates that achieve full recovery of our costs or an adequate return on our capital investments. While our rates are generally regulated based on an analysis of our costs incurred in a base year, the rates we are allowed to charge may or may not match our costs at any given time. With respect to PPL's November 1, 2010 acquisition of LKE, each of LG&E and KU has agreed with the KPSC, subject to certain limited exceptions such as fuel and environmental cost recoveries, that no base rate increases would take effect for their Kentucky retail customers before January 1, 2013. Our regulated utility businesses are subject to substantial capital expenditure requirements over the next several years, which will require rate increase requests to the regulators. If our costs are not adequately recovered through rates, it could have an adverse affect on our business, results of operations, cash flows or financial condition.

***Our domestic utility businesses are subject to significant and complex governmental regulation.***

Various federal and state entities, including but not limited to the FERC, KPSC, VSCC, TRA and PUC regulate many aspects of the domestic utility operations of PPL, including:

- the rates that we may charge and the terms and conditions of our service and operations;
- financial and capital structure matters;
- siting, construction and operation of facilities;
- mandatory reliability and safety standards and other standards of conduct;
- accounting, depreciation and cost allocation methodologies;
- tax matters;
- affiliate restrictions;
- acquisition and disposal of utility assets and securities; and
- various other matters.

Such regulations or changes thereto may subject us to higher operating costs or increased capital expenditures and failure to comply could result in sanctions or possible penalties. In any rate-setting proceedings, federal or state agencies, intervenors and other permitted parties may challenge our rate requests, and ultimately reduce, alter or limit the rates we seek.

***We could be subject to higher costs and/or penalties related to mandatory reliability standards.***

Under the Energy Policy Act of 2005, owners and operators of the bulk power transmission system are now subject to mandatory reliability standards promulgated by the NERC and enforced by the FERC. Compliance with reliability standards may subject us to higher operating costs and/or increased capital expenditures, and violations of these standards could result in substantial penalties which may not be recoverable from customers.

***Changes in transmission and wholesale power market structures could increase costs or reduce revenues.***

Wholesale revenues fluctuate with regional demand, fuel prices and contracted capacity. Changes to transmission and wholesale power market structures and prices may occur in the future, are not predictable and may result in unforeseen effects on energy purchases and sales, transmission and related costs or revenues. These can include commercial or regulatory changes affecting power pools, exchanges or markets in which PPL participates.

***Our domestic regulated businesses undertake significant capital projects and these activities are subject to unforeseen costs, delays or failures, as well as risk of inadequate recovery of resulting costs.***

The domestic regulated utility businesses are capital intensive and require significant investments in energy generation (in the case of LG&E and KU) and transmission, distribution and other infrastructure projects, such as projects for environmental compliance and system reliability. The completion of these projects without delays or cost overruns is subject to risks in many areas, including:

- approval, licensing and permitting;
- land acquisition and the availability of suitable land;
- skilled labor or equipment shortages;
- construction problems or delays, including disputes with third party intervenors;
- increases in commodity prices or labor rates;
- contractor performance;
- environmental considerations and regulations;
- weather and geological issues; and
- political, labor and regulatory developments.

Failure to complete our capital projects on schedule or on budget, or at all, could adversely affect our financial performance, operations and future growth if such expenditures are not granted rate recovery by our regulators.

### Risks Specific to Kentucky Regulated Segment

(*PPL, LKE, LG&E and KU)*

***The costs of compliance with, and liabilities under, environmental laws are significant and are subject to continuing changes.***

Extensive federal, state and local environmental laws and regulations are applicable to LG&E's and KU's generation business, including its air emissions, water discharges and the management of hazardous and solid waste, among other business-related activities; and the costs of compliance or alleged non-compliance cannot be predicted but could be material. In addition, our costs may increase significantly if the requirements or scope of environmental laws, regulations or similar rules are expanded or changed. Costs may take the form of increased capital or operating and maintenance expenses, monetary fines, penalties or forfeitures or other restrictions. Many of these environmental law considerations are also applicable to the operations of our key suppliers, or customers, such as coal producers and industrial power users, and may impact the costs of their products or demand for our services.

***On-going changes in environmental regulations or their implementation requirements and our compliance strategies relating thereto entail a number of uncertainties.***

The environmental standards governing LG&E's and KU's businesses, particularly as applicable to coal-fired generation and related activities, continue to be subject to uncertainties due to ongoing rulemakings and other regulatory developments, legislative activities, and litigation. The uncertainties associated with these developments introduce risks to our management of operations and regulatory compliance. Environmental developments, including revisions to applicable standards, changes in compliance deadlines, and invalidation of rules on appeal may require major changes in compliance strategies, operations or assets or adjustments to prior plans. Depending on the extent, frequency and timing of such changes, the companies may be subject to inconsistent requirements under multiple regulatory programs, compressed windows for decision-making and short compliance deadlines that may require aggressive schedules for construction, permitting, and other regulatory approvals. Under such circumstances, the companies may face higher risks of unsuccessful implementation of environmental-related business plans, noncompliance with applicable environmental rules, or increased costs of implementation.

### Risks Specific to Pennsylvania Regulated Segment

(*PPL and PPL Electric)*

***We may be subject to higher transmission costs and other risks as a result of PJM's regional transmission expansion plan (RTEP) process.***

PJM and the FERC have the authority to require upgrades or expansion of the regional transmission grid, which can result in substantial expenditures for transmission owners. As discussed in Note 8 to the Financial Statements, we expect to make substantial expenditures to construct the Susquehanna-Roseland transmission line that PJM has determined is necessary for the reliability of the regional transmission grid. Although the FERC has granted our request for incentive rate treatment of such facilities, we cannot be certain that all costs that we may incur will be recoverable. In addition, the date when these facilities will be in service, which can be significantly impacted by delays related to public opposition or other factors, is subject to the outcome of future events that are not all within our control. As a result, we cannot predict the ultimate financial or operational impact of this project or other RTEP projects on PPL Electric.

***We could be subject to higher costs and/or penalties related to Pennsylvania Conservation and Energy Efficiency Programs.***

Act 129 became effective in October 2008. This law created requirements for energy efficiency and conservation programs and for the use of smart metering technology, imposed new PLR electricity supply procurement rules, provided remedies for market misconduct, and made changes to the existing Alternative Energy Portfolio Standard. The law also requires electric utilities to meet specified goals for reduction in customer electricity usage and peak demand by specified dates (2011 and 2013). Utilities not meeting these requirements of Act 129 are subject to significant penalties that cannot be recovered in rates. Numerous factors outside of our control could prevent compliance with these requirements and result in penalties to us. See "Regulatory Issues - Energy Policy Act of 2005 - Reliability Standards" in Note 15 to the Financial Statements for additional information.

### Cost recovery remains subject to political risks.

Although prior initiatives have not resulted in the enactment of such legislation, the possibility remains that certain Pennsylvania legislators could introduce legislation to reinstate generation rate caps or otherwise limit cost recovery through rates for Pennsylvania utilities. If such legislation were introduced and ultimately enacted, PPL Electric could face severe financial consequences including operating losses and significant cash flow shortfalls. In addition, continuing uncertainty regarding PPL Electric's ability to recover its market supply and other costs of operating its business could adversely affect its credit quality, financing costs and availability of credit facilities necessary to operate its business.

(*PPL)*

### Risks Related to International Regulated Segment

***Our U.K. delivery business is subject to risks with respect to rate regulation and operational performance.***

Our U.K. delivery business is rate regulated and operates under an incentive-based regulatory framework. In addition, its ability to manage operational risk is critical to its financial performance. Disruption to the distribution network could reduce profitability both directly through the higher costs for network restoration and also through the system of penalties and rewards that Ofgem has in place relating to customer service levels.

In December 2009, Ofgem completed its rate review for the five-year period from April 1, 2010 through March 31, 2015, thus reducing regulatory rate risk in the International Regulated segment until the next rate review which will be effective April 1, 2015. The regulated income of the International Regulated segment and also the RAV are to some extent linked to movements in the Retail Price Index (RPI). Reductions in the RPI would adversely impact revenues and the debt/RAV ratio.

***Our U.K. distribution business exposes us to risks related to U.K. laws and regulations, taxes, economic conditions, foreign currency exchange rate fluctuations, and political conditions and policies of the U.K. government. These risks may reduce the results of operations from our U.K. distribution business.***

The acquisition, financing, development and operation of projects in the U.K. entail significant financial risks including:

- changes in laws or regulations relating to U.K. operations, including tax laws and regulations;
- changes in government policies, personnel or approval requirements;
- changes in general economic conditions affecting the U.K.;
- regulatory reviews of tariffs for distribution companies;
- severe weather and natural disaster impacts on the electric sector and our assets;
- changes in labor relations;
- limitations on foreign investment or ownership of projects and returns or distributions to foreign investors;
- limitations on the ability of foreign companies to borrow money from foreign lenders and lack of local capital or loans;
- fluctuations in foreign currency exchange rates and in converting U.K. revenues to U.S. dollars, which can increase our expenses and/or impair our ability to meet such expenses, and difficulty moving funds out of the country in which the funds were earned; and
- compliance with U.S. foreign corrupt practices laws.

***The WPD Midlands acquisition may not achieve its intended results, including anticipated cost savings, efficiencies and other benefits.***

Although we completed the WPD Midlands acquisition with the expectation that it will result in various benefits, including a significant amount of cost savings and other financial and operational benefits, there can be no assurance regarding the extent to which we will be able to realize these cost-savings or other benefits. Achieving the anticipated benefits, including cost savings, is subject to a number of uncertainties, including whether the businesses acquired can be operated in the manner we intend. Events outside of our control, including but not limited to regulatory changes or developments in the U.K., could also adversely affect our ability to realize the anticipated benefits from the WPD Midlands acquisition. Thus, the integration process may be unpredictable, subject to delays or changed circumstances, and we can give no assurance that the acquired businesses will perform in accordance with our expectations. Additional unanticipated costs may also arise during the integration process. The integration of the WPD (East Midlands) and WPD (West Midlands) businesses may place an additional burden on our management and internal resources, and the diversion of management's attention during the integration and restructuring process could have an adverse effect on our business, financial condition and expected operating results.

***The WPD Midlands acquisition exposes us to additional risks and uncertainties with respect to the acquired businesses and their operations.***

The WPD Midlands acquisition will rebalance our business mix to a greater percentage of regulated operations. While we believe this should help mitigate our exposure to downturns in the wholesale power markets, it will increase our dependence on rate-of-return regulation. Although we are already exposed to risks relating to rate-of-return regulation, the WPD Midlands acquisition will increase these risks.

The acquired businesses will generally be subject to risks similar to those to which we are subject to in our pre-acquisition U.K. businesses. These include:

- There are various changes being contemplated by Ofgem to the current electricity distribution, gas transmission and gas distribution regulatory frameworks in the U.K. and there can be no assurance as to the effects such changes will have on our U.K. regulated businesses in the future, including the acquired businesses. In particular, in October 2010, Ofgem announced a new regulatory framework that is expected to become effective in April 2015 for the electricity distribution sector in the U.K. The framework, known as RIIO (Revenues = Incentives + Innovation + Outputs), focuses on sustainability, environmental-focused output measures, promotion of low carbon energy networks and financing of new investments. The new regulatory framework is expected to have a wide-ranging effect on electricity distribution companies operating in the U.K., including changes to price controls and price review periods. Our U.K. regulated businesses' compliance with this new regulatory framework may result in significant additional capital expenditures, increases in operating and compliance costs and adjustments to our pricing models.
- Ofgem has formal powers to propose modifications to each distribution license. We are not currently aware of any planned modification to any of our U.K. regulated businesses distribution licenses that would result in a material adverse change to the U.K. regulated businesses and PPL. There can, however, be no assurance that a restrictive modification will not be introduced in the future, which could have an adverse effect on the operations and financial condition of the U.K. regulated businesses and PPL.

28

- A failure to operate our U.K. networks properly could lead to compensation payments or penalties, or a failure to make capital expenditures in line with agreed investment programs could lead to deterioration of the network. While our U.K. regulated businesses' investment programs are targeted to maintain asset conditions over a five-year period and reduce customer interruptions and customer minutes lost over that period, no assurance can be provided that these regulatory requirements will be met.
- A failure by any of our U.K. regulated businesses to comply with the terms of a distribution license may lead to the issuance of an enforcement order by Ofgem that could have an adverse impact on PPL. Ofgem has powers to levy fines of up to 10 percent of revenue for any breach of a distribution license or, in certain circumstances, such as insolvency, the distribution license itself may be revoked. Unless terminated in the circumstances mentioned above, a distribution license continues indefinitely until revoked by Ofgem following no less than 25 years' written notice.
- We will be subject to increased foreign currency exchange rate risks because a greater portion of our cash flows and reported earnings will be generated by our U.K. business operations. These risks relate primarily to changes in the relative value of the British pound sterling and the U.S. dollar between the time we initially invest U.S. dollars in our U.K. businesses and the time that cash is repatriated to the U.S. from the U.K., including cash flows from our U.K. businesses that may be distributed as future dividends to our shareholders. In addition, our consolidated reported earnings on a U.S. GAAP basis may be subject to increased earnings translation risk, which is the result of the conversion of earnings as reported in our U.K. businesses on a British pound sterling basis to a U.S. dollar basis in accordance with U.S. GAAP requirements.
- Environmental costs and liabilities associated with aspects of the acquired businesses may differ from those of our existing business.

### Risks Related to Supply Segment

(*PPL and PPL Energy Supply)*

***We face intense competition in our energy supply business, which may adversely affect our ability to operate profitably.***

Unlike our regulated utility businesses, our energy supply business is dependent on our ability to operate in a competitive environment and is not assured of any rate of return on capital investments through a predetermined rate structure. Competition is impacted by electricity and fuel prices, new market entrants, construction by others of generating assets and transmission capacity, technological advances in power generation, the actions of environmental and other regulatory authorities and other factors. These competitive factors may negatively impact our ability to sell electricity and related products and services, as well as the prices that we may charge for such products and services, which could adversely affect our results of operations and our ability to grow our business.

We sell our available energy and capacity into the competitive wholesale markets through contracts of varying duration. Competition in the wholesale power markets occurs principally on the basis of the price of products and, to a lesser extent, on the basis of reliability and availability. We believe that the commencement of commercial operation of new electric facilities in the regional markets where we own or control generation capacity and the evolution of demand side management resources will continue to increase competition in the wholesale electricity market in those regions, which could have an adverse effect on the prices we receive for electricity.

We also face competition in the wholesale markets for electricity capacity and ancillary services. We primarily compete with other electricity suppliers based on our ability to aggregate supplies at competitive prices from different sources and to efficiently utilize transportation from third-party pipelines and transmission from electric utilities and ISOs. We also compete against other energy marketers on the basis of relative financial condition and access to credit sources, and our competitors may have greater financial resources than we have.

Competitors in the wholesale power markets in which PPL Generation subsidiaries and PPL EnergyPlus operate include regulated utilities, industrial companies, non-utility generators and competitive subsidiaries of regulated utilities. In the past, the PUHCA significantly restricted mergers and acquisitions and other investments in the electric utility sector. Entirely new competitors, including financial institutions, have entered the energy markets as a result of the repeal of the original PUHCA in 2006. The repeal of the original PUHCA also may lead to consolidation in our industry, resulting in competitors with significantly greater financial resources than we have.

***Adverse changes in commodity prices and related costs may decrease our future energy margins, which could adversely affect our earnings and cash flows.***

Our energy margins, or the amount by which our revenues from the sale of power exceed our costs to supply power, are impacted by changes in market prices for electricity, fuel, fuel transportation, emission allowances, RECs, electricity transmission and related congestion charges and other costs. Unlike most commodities, the limited ability to store electric power requires that it must be consumed at the time of production. As a result, wholesale market prices for electricity may fluctuate substantially over relatively short periods of time and can be unpredictable. Among the factors that influence such prices are:

- supply and demand for electricity available from current or new generation resources;
- variable production costs, primarily fuel (and the associated fuel transportation costs) and emission allowance expense for the generation resources used to meet the demand for electricity;
- transmission capacity and service into, or out of, markets served;
- changes in the regulatory framework for wholesale power markets;
- liquidity in the wholesale electricity market, as well as general creditworthiness of key participants in the market; and
- weather and economic conditions impacting demand for or the price of electricity or the facilities necessary to deliver electricity.

***We do not always hedge against risks associated with electricity and fuel price volatility.***

We attempt to mitigate risks associated with satisfying our contractual electricity sales obligations by either reserving generation capacity to deliver electricity or purchasing the necessary financial or physical products and services through competitive markets to satisfy our net firm sales contracts. We also routinely enter into contracts, such as fuel and electricity purchase and sale commitments, to hedge our exposure to fuel requirements and other electricity-related commodities. However, based on economic and other considerations, we may decide not to hedge the entire exposure of our operations from commodity price risk. To the extent we do not hedge against commodity price risk, our results of operations and financial position may be adversely affected.

***We are exposed to operational, price and credit risks associated with selling and marketing products in the wholesale and retail electricity markets.***

We purchase and sell electricity in wholesale markets under market-based tariffs authorized by FERC throughout the U.S. and also enter into short-term agreements to market available electricity and capacity from our generation assets with the expectation of profiting from market price fluctuations. If we are unable to deliver firm capacity and electricity under these agreements, we could be required to pay damages. These damages would generally be based on the difference between the market price to acquire replacement capacity or electricity and the contract price of any undelivered capacity or electricity. Depending on price volatility in the wholesale electricity markets, such damages could be significant. Extreme weather conditions, unplanned generation facility outages, environmental compliance costs, transmission disruptions, and other factors could affect our ability to meet our obligations, or cause significant increases in the market price of replacement capacity and electricity.

Our wholesale power agreements typically include provisions requiring us to post collateral for the benefit of our counterparties if the market price of energy varies from the contract prices in excess of certain pre-determined amounts. We currently believe that we have sufficient credit to fulfill our potential collateral obligations under these power contracts. Our obligation to post collateral could exceed the amount of our facilities or our ability to increase our facilities could be limited by financial markets or other factors. See Note 7 to the Financial Statements for a discussion of PPL's credit facilities.

We also face credit risk that parties with whom we contract in both the wholesale and retail markets will default in their performance, in which case we may have to sell our electricity into a lower-priced market or make purchases in a higher-priced market than existed at the time of contract. Whenever feasible, we attempt to mitigate these risks using various means, including agreements that require our counterparties to post collateral for our benefit if the market price of energy varies from the contract price in excess of certain pre-determined amounts. However, there can be no assurance that we will avoid counterparty nonperformance risk, which could adversely impact our ability to meet our obligations to other parties, which could in turn subject us to claims for damages.

***The load following contracts that PPL EnergyPlus is awarded do not provide for specific levels of load and actual load significantly below or above our forecasts could adversely affect our energy margins.***

We generally hedge our load following obligations with energy purchases from third parties, and to a lesser extent with our own generation. If the actual load is significantly lower than the expected load, we may be required to resell power at a lower price than was contracted for to supply the load obligation, resulting in a financial loss. Alternatively, a significant increase in load could adversely affect our energy margins because we are required under the terms of the load following contracts to provide the energy necessary to fulfill increased demand at the contract price, which could be lower than the cost to procure additional energy on the open market. Therefore, any significant decrease or increase in load compared with our forecasts could have a material adverse effect on our results of operations or financial position.

***We may experience disruptions in our fuel supply, which could adversely affect our ability to operate our generation facilities.***

We purchase fuel from a number of suppliers. Disruption in the delivery of fuel and other products consumed during the production of electricity (such as coal, natural gas, oil, water, uranium, lime, limestone and other chemicals), including disruptions as a result of weather, transportation difficulties, global demand and supply dynamics, labor relations, environmental regulations or the financial viability of our fuel suppliers, could adversely affect our ability to operate our facilities, which could result in lower sales and/or higher costs and thereby adversely affect our results of operations.

***Our risk management policy and programs relating to electricity and fuel prices, interest rates, foreign currency and counterparty credit and non-performance risks may not work as planned, and we may suffer economic losses despite such programs.***

We actively manage the market risk inherent in our generation and energy marketing activities, as well as our debt, foreign currency and counterparty credit positions. We have implemented procedures to monitor compliance with our risk management policy and programs, including independent validation of transaction and market prices, verification of risk and transaction limits, portfolio stress tests, sensitivity analyses and daily portfolio reporting of various risk management metrics. Nonetheless, our risk management programs may not work as planned. For example, actual electricity and fuel prices may be significantly different or more volatile than the historical trends and assumptions upon which we based our risk management calculations. Additionally, unforeseen market disruptions could decrease market depth and liquidity, negatively impacting our ability to enter into new transactions. We enter into financial contracts to hedge commodity basis risk, and as a result are exposed to the risk that the correlation between delivery points could change with actual physical delivery. Similarly, interest rates or foreign currency exchange rates could change in significant ways that our risk management procedures were not designed to address. As a result, we cannot always predict the impact that our risk management decisions may have on us if actual events result in greater losses or costs than our risk models predict or greater volatility in our earnings and financial position.

In addition, our trading, marketing and hedging activities are exposed to counterparty credit risk and market liquidity risk. We have adopted a credit risk management policy and program to evaluate counterparty credit risk. However, if counterparties fail to perform, the risk of which has increased due to the economic downturn, we may be forced to enter into alternative arrangements at then-current market prices. In that event, our financial results are likely to be adversely affected.

***Our costs to comply with existing and new environmental laws are expected to continue to be significant, and we plan to incur significant capital expenditures for pollution control improvements that, if delayed, would adversely affect our profitability and liquidity.***

Our business is subject to extensive federal, state and local statutes, rules and regulations relating to environmental protection. To comply with existing and future environmental requirements and as a result of voluntary pollution control measures we may take, we have spent and expect to spend substantial amounts in the future on environmental control and compliance.

In order to comply with existing and proposed federal and state environmental laws and regulations primarily governing air emissions from coal-fired plants, in 2005 PPL began a program to install scrubbers and other pollution control equipment (primarily aimed at sulfur dioxide, particulate matter and nitrogen oxides with co-benefits for mercury emissions reduction). The cost to install this equipment was approximately $1.6 billion. The scrubbers at our Montour and Brunner Island plants are now in service. Many states and environmental groups have challenged certain federal laws and regulations relating to air emissions as not being sufficiently strict. As a result, it is possible that state and federal regulations will be adopted that would impose more stringent restrictions than are currently in effect, which could require us to significantly increase capital expenditures for additional pollution control equipment.

We may not be able to obtain or maintain all environmental regulatory approvals necessary for our planned capital projects which are necessary to our business. If there is a delay in obtaining any required environmental regulatory approval or if we fail to obtain, maintain or comply with any such approval, operations at our affected facilities could be halted, reduced or subjected to additional costs. Furthermore, at some of our older generating facilities it may be uneconomic for us to install necessary pollution control equipment, which could cause us to retire those units.

For more information regarding environmental matters, including existing and proposed federal, state and local statutes, rules and regulations to which we are subject, see "Environmental Matters - Domestic" in Note 15 to the Financial Statements.

***We rely on transmission and distribution assets that we do not own or control to deliver our wholesale electricity. If transmission is disrupted, or not operated efficiently, or if capacity is inadequate, our ability to sell and deliver power may be hindered.***

We depend on transmission and distribution facilities owned and operated by utilities and other energy companies to deliver the electricity and natural gas we sell in the wholesale market, as well as the natural gas we purchase for use in our electric generation facilities. If transmission is disrupted (as a result of weather, natural disasters or other reasons) or not operated efficiently by ISOs and RTOs, in applicable markets, or if capacity is inadequate, our ability to sell and deliver products and satisfy our contractual obligations may be hindered, or we may be unable to sell products at the most favorable terms.

The FERC has issued regulations that require wholesale electric transmission services to be offered on an open-access, non-discriminatory basis. Although these regulations are designed to encourage competition in wholesale market transactions for electricity, there is the potential that fair and equal access to transmission systems will not be available or that transmission capacity will not be available in the amounts we require. We cannot predict the timing of industry changes as a result of these initiatives or the adequacy of transmission facilities in specific markets or whether ISOs and RTOs in applicable markets will efficiently operate transmission networks and provide related services.

***Despite federal and state deregulation initiatives, our supply business is still subject to extensive regulation, which may increase our costs, reduce our revenues, or prevent or delay operation of our facilities.***

Our generation subsidiaries sell electricity into the wholesale market. Generally, our generation subsidiaries and our marketing subsidiaries are subject to regulation by the FERC. The FERC has authorized us to sell generation from our facilities and power from our marketing subsidiaries at market-based prices. The FERC retains the authority to modify or withdraw our market-based rate authority and to impose "cost of service" rates if it determines that the market is not competitive, that we possess market power or that we are not charging just and reasonable rates. Any reduction by the FERC in the rates we may receive or any unfavorable regulation of our business by state regulators could materially adversely affect our results of operations. See "FERC Market-Based Rate Authority" in Note 15 to the Financial Statements for information regarding recent court decisions that could impact the FERC's market-based rate authority program.

In addition, the acquisition, construction, ownership and operation of electricity generation facilities require numerous permits, approvals, licenses and certificates from federal, state and local governmental agencies. We may not be able to obtain or maintain all required regulatory approvals. If there is a delay in obtaining any required regulatory approvals or if we fail to obtain or maintain any required approval or fail to comply with any applicable law or regulation, the operation of our assets and our sales of electricity could be prevented or delayed or become subject to additional costs.

***If market deregulation is reversed or discontinued, our business prospects and financial condition could be materially adversely affected.***

In some markets, state legislators, government agencies and other interested parties have made proposals to change the use of market-based pricing, re-regulate areas of these markets that have previously been competitive or permit electricity delivery companies to construct or acquire generating facilities. The ISOs that oversee the transmission systems in certain wholesale electricity markets have from time to time been authorized to impose price limitations and other mechanisms to address extremely high prices in the power markets. These types of price limitations and other mechanisms may reduce profits that our wholesale power marketing and trading business would have realized under competitive market conditions absent such limitations and mechanisms. Although we generally expect electricity markets to continue to be competitive, other proposals to re-regulate our industry may be made, and legislative or other actions affecting the electric power restructuring process may cause the process to be delayed, discontinued or reversed in states in which we currently, or may in the future, operate. See "New Jersey Capacity Legislation" in Note 15 to the Financial Statements.

### Changes in technology may negatively impact the value of our power plants.

A basic premise of our generation business is that generating electricity at central power plants achieves economies of scale and produces electricity at relatively low prices. There are alternate technologies to produce electricity, most notably fuel cells, micro turbines, windmills and photovoltaic (solar) cells, the development of which has been expanded due to global climate change concerns. Research and development activities are ongoing to seek improvements in alternate technologies. It is possible that advances will reduce the cost of alternate methods of electricity production to a level that is equal to or below that of certain central station production. Also, as new technologies are developed and become available, the quantity and pattern of electricity usage (the "demand") by customers could decline, with a corresponding decline in revenues derived by generators. These alternative energy sources could result in a decline to the dispatch and capacity factors of our plants. As a result of all of these factors, the value of our generation facilities could be significantly reduced.

***We are subject to certain risks associated with nuclear generation, including the risk that our Susquehanna nuclear plant could become subject to increased security or safety requirements that would increase capital and operating expenditures, uncertainties regarding spent nuclear fuel, and uncertainties associated with decommissioning our plant at the end of its licensed life.***

Nuclear generation accounted for about 28% of our 2011 generation output. The risks of nuclear generation generally include:

- the potential harmful effects on the environment and human health from the operation of nuclear facilities and the storage, handling and disposal of radioactive materials;
- limitations on the amounts and types of insurance commercially available to cover losses and liabilities that might arise in connection with nuclear operations; and
- uncertainties with respect to the technological and financial aspects of decommissioning nuclear plants at the end of their licensed lives. The licenses for our two nuclear units expire in 2042 and 2044. See Note 21 to the Financial Statements for additional information on the ARO related to the decommissioning.

The NRC has broad authority under federal law to impose licensing requirements, including security, safety and employee-related requirements for the operation of nuclear generation facilities. In the event of noncompliance, the NRC has authority to impose fines or shut down a unit, or both, depending upon its assessment of the severity of the situation, until compliance is achieved. In addition, revised security or safety requirements promulgated by the NRC could necessitate substantial capital or operating expenditures at our Susquehanna nuclear plant. There also remains substantial uncertainty regarding the temporary storage and permanent disposal of spent nuclear fuel, which could result in substantial additional costs to PPL that cannot be predicted. In addition, although we have no reason to anticipate a serious nuclear incident at our Susquehanna plant, if an incident did occur, any resulting operational loss, damages and injuries could have a material adverse effect on our results of operations, cash flows or financial condition. See Note 15 to the Financial Statements for a discussion of nuclear insurance.

## Properties

As filed, 13,280 characters.

#### (PPL, LKE, LG&E and KU)

#### Kentucky Regulated Segment

LG&E's and KU's properties consist primarily of regulated generation facilities, electric transmission and distribution assets and natural gas transmission and distribution assets in Kentucky. The electric generating capacity at December 31, 2011 was:

| Primary Fuel/Plant (a) Coal | Total MW Capacity (b) Summer | LKE Ownership or Lease Interest in MW | LG&E % Ownership | Ownership or Lease Interest in MW | KU % Ownership | Ownership or Lease Interest in MW |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Ghent | 1,932 | 1,932 |  |  | 100.00 | 1,932 |
| Mill Creek | 1,472 | 1,472 | 100.00 | 1,472 |  |  |
| E.W. Brown - Units 1-3 | 684 | 684 |  |  | 100.00 | 684 |
| Cane Run - Units 4-6 | 563 | 563 | 100.00 | 563 |  |  |
| Trimble County - Unit 1 (c) | 511 | 383 | 75.00 | 383 |  |  |
| Trimble County - Unit 2 (c)(d) | 732 | 549 | 14.25 | 104 | 60.75 | 445 |
| Green River | 163 | 163 |  |  | 100.00 | 163 |
| OVEC - Clifty Creek (e) | 1,304 | 106 | 5.63 | 73 | 2.50 | 33 |
| OVEC - Kyger Creek (e) | 1,086 | 88 | 5.63 | 61 | 2.50 | 27 |
| Tyrone | 71 | 71 |  |  | 100.00 | 71 |
|  | 8,518 | 6,011 |  | 2,656 |  | 3,355 |
| **Natural Gas/Oil** |  |  |  |  |  |  |
| Trimble County Units 7-10 | 628 | 628 | 37.00 | 232 | 63.00 | 396 |
| E.W. Brown Units 8-11 (g) | 486 | 486 |  |  | 100.00 | 486 |
| E.W. Brown Units 6-7 (f) | 292 | 292 | 38.00 | 111 | 62.00 | 181 |
| Trimble County Units 5-6 | 314 | 314 | 29.00 | 91 | 71.00 | 223 |
| Paddy's Run Unit 13 | 147 | 147 | 53.00 | 78 | 47.00 | 69 |
| E.W. Brown Unit 5 (f)(g) | 132 | 132 | 53.00 | 69 | 47.00 | 63 |
| Paddy's Run Units 11-12 | 35 | 35 | 100.00 | 35 |  |  |
| Haefling | 36 | 36 |  |  | 100.00 | 36 |
| Zorn | 14 | 14 | 100.00 | 14 |  |  |
| Cane Run Unit 11 | 14 | 14 | 100.00 | 14 |  |  |
|  | 2,098 | 2,098 |  | 644 |  | 1,454 |
| **Hydro** |  |  |  |  |  |  |
| Ohio Falls | 52 | 52 | 100.00 | 52 |  |  |
| Dix Dam | 24 | 24 |  |  | 100.00 | 24 |
|  | 76 | 76 |  | 52 |  | 24 |
| Total | 10,692 | 8,185 |  | 3,352 |  | 4,833 |

(a) LG&E and KU's properties are primarily located in Kentucky, with the exception of the units owned by OVEC. Clifty Creek is located in Indiana and Kyger Creek is located in Ohio.

(b) The capacity of generation units is based on a number of factors, including the operating experience and physical conditions of the units, and may be revised periodically to reflect changed circumstances.

(c) TC1 and TC2 are jointly owned with Illinois Municipal Electric Agency and Indiana Municipal Power Agency. Each owner is entitled to its proportionate share of the units' total output and funds its proportionate share of capital, fuel and other operating costs. See Note 14 to the Financial Statements for additional information.

(d) LKE took care, custody and control of TC2 on January 22, 2011, and has dispatched the unit to meet customer demand since that date. See Note 15 to the Financial Statements for additional information.

(e) This unit is owned by OVEC. LKE has a power purchase agreement that entitles LKE to its proportionate share of the unit's total output and LKE funds its proportionate share of fuel and other operating costs. See Note 15 to the Financial Statements for additional information.

(f) Includes a leasehold interest. See Note 11 to the Financial Statements for additional information.

(g) There is an inlet air cooling system attributable to these units. This inlet air cooling system is not jointly owned; however, it is used to increase production on the units to which it relates, resulting in an additional 10 MW of capacity for LG&E and an additional 88 MW of capacity for KU.

For a description of LG&E's and KU's service areas, see "Item 1. Business - Background." At December 31, 2011, LG&E's transmission system included in the aggregate, 45 substations (32 of which are shared with the distribution system) with a total capacity of 7 million kVA and 916 circuit miles of lines. The distribution system included 97 substations (32 of which are shared with the transmission system) with a total capacity of 5 million kVA, 3,887 miles of overhead lines and 2,371 miles of underground wires. KU's transmission system included 133 substations (55 of which are shared with the distribution system) with a total capacity of 13 million kVA and 4,078 circuit miles of lines. The distribution system included 478 substations (55 of which are shared with the transmission system) with transformer capacity of 7 million kVA, 14,112 miles of overhead lines and 2,265 miles of underground conduit.

LG&E's natural gas transmission system includes 4,290 miles of gas distribution mains and 386 miles of gas transmission mains, consisting of 254 miles of gas transmission pipeline, 123 miles of gas transmission storage lines, 6 miles of gas combustion turbine lines, and 3 miles of gas transmission pipeline in regulator facilities. Five underground natural gas storage fields, with a total working natural gas capacity of approximately 15 Bcf, are used in providing natural gas service to ultimate consumers. KU's service area includes an additional 11 miles of gas transmission pipeline providing gas supply to natural gas combustion turbine electrical generating units.

Substantially all of LG&E's and KU's respective real and tangible personal property located in Kentucky and used or to be used in connection with the generation, transmission and distribution of electricity and, in the case of LG&E, the storage and distribution of natural gas, is subject to the lien of either the LG&E 2010 Mortgage Indenture or the KU 2010 Mortgage Indenture. See Note 7 to the Financial Statements for additional information.

LG&E and KU continuously reexamine development projects based on market conditions and other factors to determine whether to proceed with the projects, sell, cancel or expand them or pursue other options. At December 31, 2011, LG&E and KU planned to implement the following incremental capacity increases and decreases at the following plants located in Kentucky.

| Primary Fuel/Plant Coal | Total Net Summer MW Capacity Increase / (Decrease) (a) | LG&E % Ownership | Ownership or Lease Interest in MW | KU % Ownership | Ownership or Lease Interest in MW | Date of Incremental Capacity Increase / Decrease (b) |
| --- | ---: | ---: | ---: | ---: | ---: | --- |
| Cane Run - Units 4-6 - (c) | (563) | 100.00 | (563) |  |  | 2015 |
| Green River - (c) | (163) |  |  | 100.00 | (163) | 2015 |
| Tyrone - (c) | (71) |  |  | 100.00 | (71) | 2015 |
| Total Capacity Decreases | (797) |  | (563) |  | (234) |  |
| **Natural Gas/Oil** |  |  |  |  |  |  |
| Cane Run - Unit 7 (d) | 640 | 22.00 | 141 | 78.00 | 499 | 2016 |
| Bluegrass CTs (e) | 495 | 69.00 | 342 | 31.00 | 153 | 2012 |
| Total Capacity Increases | 1,135 |  | 483 |  | 652 |  |
| **Total** | 338 |  | (80) |  | 418 |  |

(a) The capacity of generating units is based on a number of factors, including the operating experience and physical condition of the units, and may be revised periodically to reflect changed circumstances.

(b) The expected in-service dates are subject to receipt of required approvals, permits and other contingencies.

(c) LG&E and KU anticipate retiring these units at the end of 2015. See Notes 8 and 15 to the Financial Statements for additional information.

(d) In September 2011, LG&E and KU requested approval to build this unit at the existing Cane Run site. See Note 8 to the Financial Statements for additional information.

(e) In September 2011, LG&E and KU requested approval to purchase three existing natural gas combustion units. See Note 8 to the Financial Statements for additional information.

#### (PPL)

#### International Regulated Segment

For a description of WPD's service territory, see "Item 1. Business - Background." At December 31, 2011, WPD had electric distribution lines in public streets and highways pursuant to legislation and rights-of-way secured from property owners. WPD's distribution system in the U.K. includes 1,602 substations with a total capacity of 61 million kVA, 57,472 circuit miles of overhead lines and 79,755 cable miles of underground conductors.

#### (PPL and PPL Electric)

#### Pennsylvania Regulated Segment

For a description of PPL Electric's service territory, see "Item 1. Business - Background." At December 31, 2011, PPL Electric had electric transmission and distribution lines in public streets and highways pursuant to franchises and rights-of- way secured from property owners. PPL Electric's transmission system included 60 substations with a total capacity of 17 million kVA and 6,727 pole miles. PPL Electric's distribution system included 321 substations with a total capacity of 15 million kVA, 33,145 circuit miles of overhead lines and 7,407 cable miles of underground conductors. All of PPL Electric's facilities are located in Pennsylvania. Substantially all of PPL Electric's distribution properties and certain transmission properties are subject to the lien of the PPL Electric 2001 Mortgage Indenture.

See Note 8 to the Financial Statements for information on the construction of the Susquehanna-Roseland 500-kilovolt transmission line.

#### (PPL and PPL Energy Supply)

#### Supply Segment

PPL Energy Supply's electric generating capacity (summer rating) at December 31, 2011 was:

| Primary Fuel/Plant Natural Gas/Oil | Total MW Capacity (a) | % Ownership | PPL Energy Supply's Ownership or Lease Interest in MW (a) | Location |
| --- | ---: | ---: | ---: | --- |
| Martins Creek | 1,685 | 100.00 | 1,685 | Pennsylvania |
| Ironwood (b) | 657 | 100.00 | 657 | Pennsylvania |
| Lower Mt. Bethel | 552 | 100.00 | 552 | Pennsylvania |
| Combustion turbines | 362 | 100.00 | 362 | Pennsylvania |
|  | 3,256 |  | 3,256 |  |
| **Coal** |  |  |  |  |
| Montour | 1,515 | 100.00 | 1,515 | Pennsylvania |
| Brunner Island | 1,445 | 100.00 | 1,445 | Pennsylvania |
| Colstrip Units 1 & 2 (c) | 614 | 50.00 | 307 | Montana |
| Conemaugh (d) | 1,717 | 16.25 | 279 | Pennsylvania |
| Colstrip Unit 3 (c) | 740 | 30.00 | 222 | Montana |
| Keystone (d) | 1,717 | 12.34 | 212 | Pennsylvania |
| Corette | 153 | 100.00 | 153 | Montana |
|  | 7,901 |  | 4,133 |  |
| **Nuclear** |  |  |  |  |
| Susquehanna (d) | 2,528 | 90.00 | 2,275 | Pennsylvania |
| **Hydro** |  |  |  |  |
| Various | 604 | 100.00 | 604 | Montana |
| Various | 175 | 100.00 | 175 | Pennsylvania |
|  | 779 |  | 779 |  |
| **Qualifying Facilities** |  |  |  |  |
| Renewables (e) | 57 | 100.00 | 57 | Pennsylvania |
| Renewables | 8 | 100.00 | 8 | Various |
|  | 65 |  | 65 |  |
| Total | 14,529 |  | 10,508 |  |

(a) The capacity of generation units is based on a number of factors, including the operating experience and physical conditions of the units, and may be revised periodically to reflect changed circumstances.

(b) Facility not owned by PPL Energy Supply, but there is a tolling agreement in place through 2021.

(c) Represents the leasehold interest held by PPL Montana. See Note 11 to the Financial Statements for additional information.

(d) This unit is jointly owned. Each owner is entitled to their proportionate share of the unit's total output and funds their proportionate share of fuel and other operating costs. See Note 14 to the Financial Statements for additional information.

(e) Includes facilities owned, controlled or for which PPL Energy Supply has the rights to the output.

Amounts guaranteed by PPL Montour and PPL Brunner Island in connection with an $800 million secured energy marketing and trading facility are secured by liens on the generating facilities owned by PPL Montour and PPL Brunner Island. See Note 7 to the Financial Statements for additional information.

PPL Energy Supply continuously reexamines development projects based on market conditions and other factors to determine whether to proceed with the projects, sell, cancel or expand them, execute tolling agreements or pursue other options. At December 31, 2011, PPL Energy Supply subsidiaries planned to implement the following incremental capacity increases.

| Primary Fuel/Plant Hydro | Location | Total MW Capacity (a) | PPL Energy Supply Ownership or Lease Interest in MW |  | Expected In-Service Date (b) |
| --- | --- | ---: | ---: | ---: | --- |
| Holtwood (c) | Pennsylvania | 128 | 128 | (100%) | 2012 - 2013 |
| Lower Mt. Bethel (d) | Pennsylvania | 33 | 33 | (100%) | 2012 |
| Great Falls (e) | Montana | 28 | 28 | (100%) | 2012 |
| **Solar** |  |  |  |  |  |
| Warren County | New Jersey | 2 | 2 | (100%) | 2012 |
| **Total** |  | 191 | 191 |  |  |

(a) The capacity of generating units is based on a number of factors, including the operating experience and physical condition of the units, and may be revised periodically to reflect changed circumstances.

(b) The expected in-service dates are subject to receipt of required approvals, permits and other contingencies.

(c) This project includes installation of two additional large turbine-generators and the replacement of four existing runners.

(d) This project includes installation of enhanced compressor and turbine hardware and control logic optimization that will increase output and improve heat rate.

(e) This project involves the reconstruction of a powerhouse.

## Legal proceedings

As filed, 152 characters.

See Notes 5, 6 and 15 to the Financial Statements for information regarding legal, tax litigation, regulatory and environmental proceedings and matters.

## Market risk

As filed, 28,233 characters.

**PPL Corporation, PPL Energy Supply, LLC, PPL Electric Utilities Corporation, LG&E and KU Energy LLC, Louisville Gas and Electric Company and Kentucky Utilities Company**

Reference is made to "Risk Management - Energy Marketing & Trading and Other" for PPL and PPL Energy Supply and "Risk Management" for PPL Electric, LKE, LG&E and KU in "Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations."

To the Board of Directors and Shareowners of PPL Corporation

We have audited the accompanying consolidated balance sheets of PPL Corporation and subsidiaries as of December 31, 2011 and 2010, and the related consolidated statements of income, comprehensive income, equity, and cash flows for each of the three years in the period ended December 31, 2011. Our audits also included the financial statement schedule listed in the index at Item 15(a). These financial statements and schedule are the responsibility of the Company's management. Our responsibility is to express an opinion on these financial statements and schedule based on our audits. We did not audit the 2010 financial statements of LG&E and KU Energy LLC (LKE), a wholly owned subsidiary, which statements reflect total assets of $10,719 million as of December 31, 2010, and total revenues of $493 million for the period November 1, 2010 (date of acquisition) to December 31, 2010. Those statements were audited by other auditors whose report has been furnished to us, and our opinion, insofar as it relates to the amounts included for LKE, is based solely on the report of the other auditors.

We conducted our audits in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. An audit includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements. An audit also includes assessing the accounting principles used and significant estimates made by management, as well as evaluating the overall financial statement presentation. We believe that our audits and the report of other auditors provide a reasonable basis for our opinion.

In our opinion, based on our audits and, for 2010, the report of other auditors, the financial statements referred to above present fairly, in all material respects, the consolidated financial position of PPL Corporation and subsidiaries at December 31, 2011 and 2010, and the consolidated results of their operations and their cash flows for each of the three years in the period ended December 31, 2011, in conformity with U.S. generally accepted accounting principles. Also, in our opinion, the related financial statement schedule, when considered in relation to the basic financial statements taken as a whole, presents fairly in all material respects the information set forth therein.

We also have audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), PPL Corporation's internal control over financial reporting as of December 31, 2011, based on criteria established in Internal Control-Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission and our report dated February 28, 2012 expressed an unqualified opinion thereon.

Philadelphia, Pennsylvania

To the Board of Directors and Shareowners of PPL Corporation

We have audited PPL Corporation's internal control over financial reporting as of December 31, 2011, based on criteria established in Internal Control—Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission (the COSO criteria). PPL Corporation's management is responsible for maintaining effective internal control over financial reporting, and for its assessment of the effectiveness of internal control over financial reporting included in Management's Report on Internal Control over Financial Reporting at Item 9A. Our responsibility is to express an opinion on the company's internal control over financial reporting based on our audit.

We conducted our audit in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether effective internal control over financial reporting was maintained in all material respects. Our audit included obtaining an understanding of internal control over financial reporting, assessing the risk that a material weakness exists, testing and evaluating the design and operating effectiveness of internal control based on the assessed risk, and performing such other procedures as we considered necessary in the circumstances. We believe that our audit provides a reasonable basis for our opinion.

A company's internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles. A company's internal control over financial reporting includes those policies and procedures that (1) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the company; (2) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with U.S. generally accepted accounting principles, and that receipts and expenditures of the company are being made only in accordance with authorizations of management and directors of the company; and (3) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the company's assets that could have a material effect on the financial statements.

Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Also, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

As set forth in Item 9A, Management's Report on Internal Control over Financial Reporting, management's assessment of and conclusion on the effectiveness of internal control over financial reporting did not include the internal controls of WPD Midlands, which is included in the 2011 consolidated financial statements of PPL Corporation and subsidiaries and constituted 19% and 27% of total assets and net assets, respectively, as of December 31, 2011 and 6% and 9% of revenues and net income, respectively, for the year then ended. Our audit of internal control over financial reporting of PPL Corporation and subsidiaries also did not include an evaluation of the internal control over financial reporting of WPD Midlands.

In our opinion, PPL Corporation maintained, in all material respects, effective internal control over financial reporting as of December 31, 2011, based on the COSO criteria.

We also have audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the consolidated balance sheets of PPL Corporation and subsidiaries as of December 31, 2011 and 2010, and the related consolidated statements of income, comprehensive income, equity, and cash flows for each of the three years in the period ended December 31, 2011 and our report dated February 28, 2012 expressed an unqualified opinion thereon.

Philadelphia, Pennsylvania

To the Board of Managers and Sole Member of PPL Energy Supply, LLC

We have audited the accompanying consolidated balance sheets of PPL Energy Supply, LLC and subsidiaries as of December 31, 2011 and 2010, and the related consolidated statements of income, comprehensive income, equity, and cash flows for each of the three years in the period ended December 31, 2011. These financial statements are the responsibility of the Company's management. Our responsibility is to express an opinion on these financial statements based on our audits.

We conducted our audits in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. We were not engaged to perform an audit of the Company's internal control over financial reporting. Our audits included consideration of internal control over financial reporting as a basis for designing audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the Company's internal control over financial reporting. Accordingly, we express no such opinion. An audit also includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements, assessing the accounting principles used and significant estimates made by management, and evaluating the overall financial statement presentation. We believe that our audits provide a reasonable basis for our opinion.

In our opinion, the financial statements referred to above present fairly, in all material respects, the consolidated financial position of PPL Energy Supply, LLC and subsidiaries at December 31, 2011 and 2010, and the consolidated results of their operations and their cash flows for each of the three years in the period ended December 31, 2011, in conformity with U.S. generally accepted accounting principles.

Philadelphia, Pennsylvania

To the Board of Directors and Shareowners of PPL Electric Utilities Corporation

We have audited the accompanying consolidated balance sheets of PPL Electric Utilities Corporation and subsidiaries as of December 31, 2011 and 2010, and the related consolidated statements of income, shareowners' equity, and cash flows for each of the three years in the period ended December 31, 2011. These financial statements are the responsibility of the Company's management. Our responsibility is to express an opinion on these financial statements based on our audits.

We conducted our audits in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. We were not engaged to perform an audit of the Company's internal control over financial reporting. Our audits included consideration of internal control over financial reporting as a basis for designing audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the Company's internal control over financial reporting. Accordingly, we express no such opinion. An audit also includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements, assessing the accounting principles used and significant estimates made by management, and evaluating the overall financial statement presentation. We believe that our audits provide a reasonable basis for our opinion.

In our opinion, the financial statements referred to above present fairly, in all material respects, the consolidated financial position of PPL Electric Utilities Corporation and subsidiaries at December 31, 2011 and 2010, and the consolidated results of their operations and their cash flows for each of the three years in the period ended December 31, 2011, in conformity with U.S. generally accepted accounting principles.

Philadelphia, Pennsylvania

To the Board of Directors and Sole Member of LG&E and KU Energy LLC

We have audited the accompanying consolidated balance sheet of LG&E and KU Energy LLC and subsidiaries as of December 31, 2011, and the related consolidated statements of income, comprehensive income, cash flows, and equity for the year then ended. Our audit also included the financial statement schedule listed in the index at Item 15(a). These financial statements and schedule are the responsibility of the Company's management. Our responsibility is to express an opinion on these financial statements and schedule based on our audit.

We conducted our audit in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. We were not engaged to perform an audit of the Company's internal control over financial reporting. Our audit included consideration of internal control over financial reporting as a basis for designing audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the Company's internal control over financial reporting. Accordingly, we express no such opinion. An audit also includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements, assessing the accounting principles used and significant estimates made by management, and evaluating the overall financial statement presentation. We believe that our audit provides a reasonable basis for our opinion.

In our opinion, the financial statements referred to above present fairly, in all material respects, the consolidated financial position of LG&E and KU Energy LLC and subsidiaries at December 31, 2011 and the consolidated results of their operations and their cash flows for the year then ended, in conformity with U.S. generally accepted accounting principles. Also, in our opinion, the related financial statement schedule, when considered in relation to the basic financial statements taken as a whole, presents fairly in all material respects the information set forth therein.

To the Member of LG&E and KU Energy LLC

In our opinion, the accompanying consolidated balance sheet and the related consolidated statements of income, retained earnings, comprehensive income, cash flows, and capitalization present fairly, in all material respects, the financial position of LG&E and KU Energy LLC and its subsidiaries (Successor Company) at December 31, 2010 and the results of their operations and their cash flows for the period from November 1, 2010 to December 31, 2010 in conformity with accounting principles generally accepted in the United States of America. In addition, in our opinion, the financial statement schedule listed in the index appearing under Item 15(a)(2) presents fairly, in all material respects, the information set forth therein when read in conjunction with the related consolidated financial statements. These financial statements and financial statement schedule are the responsibility of the Company's management. Our responsibility is to express an opinion on these financial statements and financial statement schedule based on our audit. We conducted our audit of these statements in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. An audit includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements, assessing the accounting principles used and significant estimates made by management, and evaluating the overall financial statement presentation. We believe that our audit provides a reasonable basis for our opinion.

As discussed in Note 10 to the consolidated financial statements, on November 1, 2010, PPL Corporation completed its acquisition of LG&E and KU Energy LLC and its subsidiaries. The push-down basis of accounting was used at the acquisition date.

To the Member of LG&E and KU Energy LLC

In our opinion, the accompanying consolidated statements of income, retained earnings (deficit), comprehensive income (loss), cash flows, and capitalization present fairly, in all material respects, the results of operations and cash flows of LG&E and KU Energy LLC and its subsidiaries (formerly E.ON U.S. LLC, Predecessor Company) for the period from January 1, 2010 to October 31, 2010 and for the year ended December 31, 2009 in conformity with accounting principles generally accepted in the United States of America. In addition, in our opinion, the financial statement schedule listed in the index appearing under Item 15(a)(2) presents fairly, in all material respects, the information set forth therein when read in conjunction with the related consolidated financial statements. These financial statements and financial statement schedule are the responsibility of the Company’s management. Our responsibility is to express an opinion on these financial statements and financial statement schedule based on our audits. We conducted our audits of these statements in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. An audit includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements, assessing the accounting principles used and significant estimates made by management, and evaluating the overall financial statement presentation. We believe that our audits provide a reasonable basis for our opinion.

As discussed in Note 10 to the consolidated financial statements, on November 1, 2010, PPL Corporation completed its acquisition of LG&E and KU Energy LLC and its subsidiaries. The push-down basis of accounting was used at the acquisition date.

To the Board of Directors and Sole Stockholder of Louisville Gas and Electric Company

We have audited the accompanying balance sheet of Louisville Gas and Electric Company as of December 31, 2011, and the related statements of income, comprehensive income, cash flows, and equity for the year then ended. These financial statements are the responsibility of the Company's management. Our responsibility is to express an opinion on these financial statements based on our audit.

We conducted our audit in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. We were not engaged to perform an audit of the Company's internal control over financial reporting. Our audit included consideration of internal control over financial reporting as a basis for designing audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the Company's internal control over financial reporting. Accordingly, we express no such opinion. An audit also includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements, assessing the accounting principles used and significant estimates made by management, and evaluating the overall financial statement presentation. We believe that our audit provides a reasonable basis for our opinion.

In our opinion, the financial statements referred to above present fairly, in all material respects, the financial position of Louisville Gas and Electric Company at December 31, 2011 and the results of its operations and its cash flows for the year then ended, in conformity with U.S. generally accepted accounting principles.

To the Stockholder of Louisville Gas and Electric Company

In our opinion, the accompanying balance sheet and the related statements of income, retained earnings, comprehensive income, cash flows, and capitalization present fairly, in all material respects, the financial position of Louisville Gas and Electric Company (Successor Company) at December 31, 2010 and the results of its operations and its cash flows for the period from November 1, 2010 to December 31, 2010 in conformity with accounting principles generally accepted in the United States of America. These financial statements are the responsibility of the Company's management. Our responsibility is to express an opinion on these financial statements based on our audit. We conducted our audit of these statements in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. An audit includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements, assessing the accounting principles used and significant estimates made by management, and evaluating the overall financial statement presentation. We believe that our audit provides a reasonable basis for our opinion.

As discussed in Note 10 to the financial statements, on November 1, 2010, PPL Corporation completed its acquisition of LG&E and KU Energy LLC and its subsidiaries. The push-down basis of accounting was used at the acquisition date.

To the Stockholder of Louisville Gas and Electric Company

In our opinion, the accompanying statements of income, retained earnings, comprehensive income, cash flows, and capitalization present fairly, in all material respects, the results of operations and cash flows of Louisville Gas and Electric Company (Predecessor Company) for the period from January 1, 2010 to October 31, 2010 and for the year ended December 31, 2009 in conformity with accounting principles generally accepted in the United States of America. These financial statements are the responsibility of the Company’s management. Our responsibility is to express an opinion on these financial statements based on our audits. We conducted our audits of these statements in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. An audit includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements, assessing the accounting principles used and significant estimates made by management, and evaluating the overall financial statement presentation. We believe that our audits provide a reasonable basis for our opinion.

As discussed in Note 10 to the financial statements, on November 1, 2010, PPL Corporation completed its acquisition of LG&E and KU Energy LLC and its subsidiaries. The push-down basis of accounting was used at the acquisition date.

To the Board of Directors and Sole Stockholder of Kentucky Utilities Company

We have audited the accompanying balance sheet of Kentucky Utilities Company as of December 31, 2011, and the related statements of income, comprehensive income, cash flows, and equity for the year then ended. These financial statements are the responsibility of the Company's management. Our responsibility is to express an opinion on these financial statements based on our audit.

We conducted our audit in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. We were not engaged to perform an audit of the Company's internal control over financial reporting. Our audit included consideration of internal control over financial reporting as a basis for designing audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the Company's internal control over financial reporting. Accordingly, we express no such opinion. An audit also includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements, assessing the accounting principles used and significant estimates made by management, and evaluating the overall financial statement presentation. We believe that our audit provides a reasonable basis for our opinion.

In our opinion, the financial statements referred to above present fairly, in all material respects, the financial position of Kentucky Utilities Company at December 31, 2011 and the results of its operations and its cash flows for the year then ended, in conformity with U.S. generally accepted accounting principles.

To the Stockholder of Kentucky Utilities Company

In our opinion, the accompanying balance sheet and the related statements of income, retained earnings, comprehensive income, cash flows, and capitalization present fairly, in all material respects, the financial position of Kentucky Utilities Company (Successor Company) at December 31, 2010 and the results of its operations and its cash flows for the period from November 1, 2010 to December 31, 2010 in conformity with accounting principles generally accepted in the United States of America. These financial statements are the responsibility of the Company's management. Our responsibility is to express an opinion on these financial statements based on our audit. We conducted our audit of these statements in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. An audit includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements, assessing the accounting principles used and significant estimates made by management, and evaluating the overall financial statement presentation. We believe that our audit provides a reasonable basis for our opinion.

As discussed in Note 10 to the financial statements, on November 1, 2010, PPL Corporation completed its acquisition of LG&E and KU Energy LLC and its subsidiaries. The push-down basis of accounting was used at the acquisition date.

To the Stockholder of Kentucky Utilities Company

In our opinion, the accompanying statements of income, retained earnings, comprehensive income, cash flows, and capitalization present fairly, in all material respects, the results of operations and cash flows of Kentucky Utilities Company (Predecessor Company) for the period from January 1, 2010 to October 31, 2010 and for the year ended December 31, 2009 in conformity with accounting principles generally accepted in the United States of America. These financial statements are the responsibility of the Company’s management. Our responsibility is to express an opinion on these financial statements based on our audits. We conducted our audits of these statements in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. An audit includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements, assessing the accounting principles used and significant estimates made by management, and evaluating the overall financial statement presentation. We believe that our audits provide a reasonable basis for our opinion.

As discussed in Note 10 to the financial statements, on November 1, 2010, PPL Corporation completed its acquisition of LG&E and KU Energy LLC and its subsidiaries. The push-down basis of accounting was used at the acquisition date.

Filed Feb 28, 2012.