# Public Service Enterprise Group Inc: Form 10-K for the period ended Dec 31, 2008

- Company: [Public Service Enterprise Group Inc](/companies/peg.md) (CIK 788784)
- Form: 10-K
- Filed: 2009-02-26
- Accepted by EDGAR: Feb 26, 2009, 22:27 ET
- Period: 2008-12-31
- Accession: 0000930413-09-001045
- Inline XBRL: no
- Main document: https://www.sec.gov/Archives/edgar/data/788784/000093041309001045/c56713_10k.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/788784/000093041309001045/

## Business

As filed, 98,223 characters.

We were incorporated under the laws of the State of New Jersey in 1985 and our principal executive offices are located at 80 Park Plaza, Newark, New Jersey 07102. We conduct our business through three direct wholly owned subsidiaries, Power, PSE&G and Energy Holdings, each of which also has its principal executive offices at 80 Park Plaza, Newark, New Jersey 07102. PSEG Services Corporation (Services), our wholly owned subsidiary, provides us and these operating subsidiaries with certain management, administrative and general services at cost.

*PSEG*

|  |  |  |
| --- | --- | --- |
| We are an energy company with a diversified business mix. Our operations are located primarily in the Northeastern and Mid Atlantic United States. Our business approach focuses on operational excellence, financial strength and disciplined investment. As a holding company, our profitability depends significantly on our subsidiaries’ operating capabilities. Below are descriptions of our principal operating subsidiaries. |  |  |
| **Power** | **PSE&G** | **Energy Holdings** |
| A Delaware limited liability company formed in 1999 that integrates its generating asset operations with its wholesale energy sales, fuel supply, energy trading and marketing and risk management functions. Earns revenues from selling under contract or on the spot market a range of diverse products such as electricity, natural gas, capacity, emissions credits, congestion credits and a series of energy-related products used to optimize the operation of the energy grid. Owns approximately 13,600 megawatts (MWs) of generation capacity located in the Northeast and Mid Atlantic regions of the U.S. in some of the country’s largest and most developed electricity markets. | A New Jersey corporation, incorporated in 1924, which is a regulated public utility providing transmission and distribution of electric energy and natural gas in New Jersey. It is also the provider of last resort for gas and electric commodity service for end users in its service territory. Earns revenue from its regulated rate tariffs under which it provides electric transmission and electric and gas distribution to residential, commercial and industrial customers in its service territory. It also offers appliance services and repairs to customers throughout its service territory. Provides service to 2.1 million electric customers and 1.7 million gas customers in a service area that covers approximately 2,600 square miles running diagonally across New Jersey where approximately 5.5 million people, or about 70% of the State’s population, resides. Serves the most heavily populated, commercialized and industrialized territory in New Jersey, including its six largest cities and approximately 300 suburban and rural communities. | A New Jersey limited liability company (formed as successor to a company which was incorporated in 1989) that invests and operates through its two primary subsidiaries. Earns revenues from the operation of generation projects and passive energy-related investments. Owns approximately 2,400 MW of generation capacity, mostly in Texas. Also owns and manages a $2 billion diversified portfolio of passive investments, which consists mainly of energy-related leveraged leases. |

The majority of our earnings are derived from the operations of Power, which has contributed at least 70% of our Income from Continuing Operations over the past three years. While this part of the business has produced significant earnings over that period, its operations are subject to higher risks resulting from volatility in the energy markets. PSE&G has continued to produce stable earnings contributions for us. Earnings from Energy Holdings have declined in recent years as we have significantly reduced our investment in international projects. Energy Holdings’ earnings have also been impacted by gains and losses on its asset sales and other charges and impairments taken on its remaining investments.

| Earnings (Losses) in millions | 2008 | 2007 | 2006 |
| --- | ---: | ---: | ---: |
| Power | $1,050 | $949 | $515 |
| PSE&G | 364 | 380 | 265 |
| Energy Holdings | (403) | 63 | (30) |
| Other | (28) | (67) | (77) |
| **PSEG Income from Continuing Operations** | **$983** | **$1,325** | **$673** |

The following is a more detailed description of our business, including a discussion of our:

- Business Operations and Strategy
- Competitive Environment
- Employee Relations
- Regulatory Issues
- Environmental Matters

### BUSINESS OPERATIONS AND STRATEGY

### Power

Through Power, we seek to produce low-cost energy by efficiently operating our nuclear, coal and gas-fired generation facilities, while balancing generation production, fuel requirements and supply obligations through energy portfolio management. We use commodity and financial instruments, combined with our owned generation, to cover our commitments for Basic Generation Service (BGS) in New Jersey and other bilateral contract agreements.

### Products and Services

As a merchant generator, our profit is derived from selling a range of products and services under contract to power marketers and to load-serving entities, such as investor-owned and municipal utilities, and to aggregators who resell energy to retail consumers, or on the spot market. These products and services include:

- **Energy—**is the electrical output produced by generation plants that is ultimately delivered to customers for use in lighting, heating, air conditioning and operation of other electrical equipment. Energy is our principal product and is priced on a usage basis, typically in cents per kWh or dollars per MWh.
- **Capacity—**a product distinct from energy, is a market commitment that a given unit will be available to an Independent System Operator (ISO) for dispatch if it is needed to meet system demand. Capacity is typically priced in dollars per MW for a given sale period.
- **Ancillary Services—**are related activities supplied by generation unit owners to the wholesale market, required by the ISO to ensure the safe and reliable operation of the bulk power system. Owners of generation units may bid units into the ancillary services market in return for compensatory payments. Costs to pay generators for ancillary services are recovered through charges imposed on market participants.
- **Emissions Allowances and Congestion Credits—**Emissions Allowances (or credits) represent the right to emit a specific amount of certain pollutants. Allowance trading is used to control air pollution by providing economic incentives for achieving reductions in the emissions of pollutants. Congestion credits (or Financial Transmission Rights) are financial instruments that entitle the holder

3 to a stream of revenues (or charges) based on the hourly congestion price differences across a transmission path.

Power also sells wholesale natural gas, primarily through a full requirements Basic Gas Supply Service (BGSS) contract with PSE&G to meet the gas supply requirements of PSE&G’s gas customers. The current BGSS contract runs through March 31, 2012.

About 42% of PSE&G’s peak daily gas requirements comes from our firm transportation, which is available every day of the year. We satisfy the remainder of PSE&G’s requirements from our field storage, liquefied natural gas, seasonal purchases, contract peaking supply, propane and refinery and landfill gas. Based upon availability, we also sell gas to others.

### How Power Operates

We have ownership interests in five nuclear generating units: Salem Units 1 and 2, each owned 57.41% by us and 42.59% by Exelon Generation and which we operate; Hope Creek, 100% owned and operated by us; and Peach Bottom Units 2 and 3, each of which is operated by Exelon Generation and owned 50% by us and 50% by Exelon Generation. Salem 1 and 2 and Hope Creek are located at the same site. We also have ownership interests in fossil-fueled generating stations in the Northeast and Mid Atlantic U.S. These units use coal, natural gas and oil for electric generation.

The map below shows the locations of Power’s generation facilities. For additional information, see Item 2. Properties.

### Generation Capacity

Our installed capacity is comprised of a diverse mix of fuels: 45% gas, 27% nuclear, 17% coal, 9% oil and 2% pumped storage. This fuel diversity serves to mitigate risks associated with fuel price volatility and market demand cycles. Our total generating output in 2008 was approximately 55,300 GWh, which was the highest level of generating output achieved in a year by our facilities. We anticipate that our 2009 electric output will be approximately 58,000 GWh. The following table indicates the proportionate share of generating output by fuel type.

| Generation by Fuel Type Nuclear: | Actual 2008 | Estimated 2009 (A) |
| --- | ---: | ---: |
| New Jersey facilities | 36% | 35% |
| Pennsylvania facilities | 17% | 16% |
| Fossil: |  |  |
| Coal: |  |  |
| New Jersey facilities | 8% | 11% |
| Pennsylvania facilities | 11% | 10% |
| Connecticut facilities | 5% | 5% |
| Oil and Natural Gas: |  |  |
| New Jersey facilities | 18% | 17% |
| New York facilities | 5% | 6% |
| **Total** | **100%** | **100%** |

(A) No assurances can be given that actual 2009 output by source will match estimates.

¡ **Generation Dispatch**

Our generation units are typically characterized as serving one or more of the three general energy market segments: base load; load following; and peaking, based on their operating capability and performance. On a capacity basis, our portfolio of generation assets consists of 35% base load, 43% load following and 22% peaking. This diversity serves to reduce the risk associated with market demand cycles and allows us to participate in the market at each segment of the dispatch curve.

¡ **Base Load Units** are the largest and most efficient units that we operate. These units operate whenever they are available. These units generally derive revenues from energy and capacity sales. Operating costs are low due to the combination of high efficiency and the use of coal and nuclear fuels, which have generally been lower in cost relative to oil or natural gas. Performance is generally measured by the unit’s “capacity factor,” or the ratio of the actual output to the theoretical maximum output. During 2008, our base load coal unit average capacity factor was 86.2%. Our base load nuclear unit capacity factors were as follows:

| Unit | Capacity Factor |
| --- | ---: |
| Salem Unit 1 | 89.9% |
| Salem Unit 2 | 81.2% |
| Hope Creek | 100.8% |
| Peach Bottom Unit 2 | 87.4% |
| Peach Bottom Unit 3 | 98.2% |

No assurances can be given that these capacity factors will be achieved in the future.

|  |  |
| --- | --- |
| ¡ | Load Following Units are generally less efficient than base load units. These units generally operate between 20% and 80% of the time. The operating costs are generally higher per unit of output due to lower efficiency and/or the use of higher cost fuels such as oil and natural gas. They operate less frequently than base load units and generally derive revenues from energy, capacity and ancillary services. |
| ¡ | Peaking Units are the least efficient units, run the least amount of time, and generally utilize higher-priced fuels. These units generally operate less than 20% of the time. Costs per unit of output tend to be much higher than that of base load units. The majority of a peaking unit’s revenues is from capacity and ancillary service sales. The characteristics of these units enable them to capture energy revenues during periods of high energy prices. |
|  | In the energy markets in which we operate, owners of power plants generally specify to the ISO prices at which they are prepared to generate and sell energy based on the marginal cost of generating energy from each individual unit. The ISOs will generally dispatch in merit order, calling on the lowest variable cost units first and dispatching progressively higher-cost units until the point that the entire system demand for power (known as the system “load”) is satisfied. Base load units are generally dispatched first, with load following units next, followed by peaking units. The following illustrative chart depicts the order of dispatch of our units based on their dispatch cost: |

### Our Generation Facilities Along Dispatch Curve

The bid price of the last unit dispatched by an ISO establishes the energy market-clearing price. In PJM, after considering the market-clearing price and the effect of transmission, congestion and other factors, the ISO calculates the locational marginal pricing (LMP) for every generation facility. The ISO pays all units that are dispatched their respective LMP for each MWh of energy produced, regardless of their specific bid prices. Since bids generally approximate the marginal cost of production, units with lower marginal costs generate higher operating profits than units with comparatively higher marginal costs.

During periods when one or more parts of the transmission grid are operating at full capability, resulting in a constraint on the transmission system, it may not be possible to dispatch units in merit order without violating transmission reliability standards. Under such circumstances, the ISO will dispatch higher-cost generation out of merit order within the congested area and power suppliers will be paid an increased LMP in congested areas, reflecting the bid prices of those higher-cost generation units.

This method of determining supply and pricing creates an environment in the markets in which Power participates where natural gas prices have often had a major impact on the price that generators will receive for their output, especially in periods of relatively strong demand. As such, significant changes in the price of natural gas will often translate into significant changes in the price of electricity.

For example, the price of natural gas at the Henry Hub terminal increased from an average of about $3 per MMBtu in 2002 to about $9 per MMBtu on average in 2008. Similarly, the electricity spot price quoted at the PJM West market increased from an average of about $25 per MWh for 2002 to an average of about $70 per MWh in 2008. The prices at which transactions are entered into for future delivery of these products also are volatile, as evidenced by the market for forward contracts at points such as PJM West. The historical annual spot prices and forward calendar prices as averaged over a year are reflected in the graphs below.

The prices reflected in the tables above do not necessarily illustrate our contract prices, but they are representative of market prices at relatively liquid hubs, with nearer-term forward pricing generally resulting from more liquid markets than pricing for later years. In addition, the prices do not reflect locational differences resulting from congestion or other factors which can be considerable. While these prices provide some perspective on past and future prices, the forward prices are highly volatile and there is no assurance that such prices will remain in effect nor that we will be able to contract output at these forward prices.

### Fuel Supply

- ***Nuclear Fuel Supply—***To run our nuclear units we have long-term contracts for nuclear fuel. These contracts provide for:

purchase of uranium (concentrates and uranium hexafluoride);

conversion of uranium concentrates to uranium hexafluoride;

enrichment of uranium hexafluoride; and

fabrication of nuclear fuel assemblies.

|  |  |
| --- | --- |
| • | Coal Supply—Coal is the primary fuel for our Hudson, Mercer, Keystone, Conemaugh and Bridgeport stations. We have contracts with numerous suppliers. Coal is delivered to our units through a combination of rail, truck, barge or ocean shipments. |
|  | In order to minimize emissions levels, our Bridgeport 3 and Hudson units use a specific type of coal obtained from Indonesia. If the supply from Indonesia or equivalent coal from other sources was not available for these facilities, their near-term operations would be adversely impacted. In the longer-term, additional material capital expenditures would be required to modify our Bridgeport 3 station to enable it to operate using a broader mix of coal sources. |
|  | Recent volatility in the price of coal has prompted action by coal suppliers to attempt to renegotiate contracts. In particular, the Indonesian government requested that one of its domestic suppliers renegotiate its contracts with us to reflect more current market prices based on certain coal indexes. We reached an agreement with this supplier, which has resulted in an adjustment to the pricing, volumes and term of our contract. |
|  | We are constructing pollution control equipment at Hudson and Mercer that is designed to provide more flexibility in the types of coal we can use at those stations. |
| • | Gas Supply—Natural gas is the primary fuel for the bulk of our load following and peaking fleet. We purchase gas directly from natural gas producers and marketers. These supplies are transported to New Jersey by four interstate pipelines with whom we have contracted. |
|  | We have one billion cubic feet-per-day of firm transportation capacity under contract to meet the primary gas supply needs of our generation fleet and our obligations under the BGSS contract. We supplement that supply with a total storage capacity of 80 billion cubic feet. |
| • | Oil—Oil is used as the primary fuel for two load following steam units and nine combustion turbine peaking units and can be used as an alternate fuel by several load following and peaking units that have dual-fuel capability. Oil is purchased on the spot market and delivered by truck, barge, or pipeline. |

We expect to be able to meet the fuel supply demands of our customers and our own operations. However, the ability to maintain an adequate fuel supply could be affected by several factors not within our control, including changes in prices and demand, curtailments by suppliers, severe weather and the availability of feedstocks for the production of supplements to the natural gas supply. For additional information, see Item 7. MD&A—Overview of 2008 and Future Outlook and Note 11. Commitments and Contingent Liabilities.

### Markets and Market Pricing

In the Northeast and Mid Atlantic U.S., there are three centralized, competitive electricity markets now being operated by ISO organizations:

- **PJM Regional Transmission Organization—**PJM conducts the largest centrally dispatched energy market in North America. It serves nearly 17% of the total U.S. population and has a peak demand of over 139,000 MW. The PJM Interconnection coordinates the movement of electricity through all or parts of Delaware, Illinois, Indiana, Kentucky, Maryland, Michigan, New Jersey, North Carolina, Ohio, Pennsylvania, Tennessee, Virginia, West Virginia and the District of Columbia. All of Power’s generating stations, except for the Bethlehem Energy Center (BEC) and the Bridgeport and New Haven stations, operate in PJM.
- **New York—**The New York ISO is the market coordinator for New York State and is now responsible for managing the New York power pool and for administering its energy marketplace. This service area has a population of about 19 million and a peak demand of over 32,000 MW. Power’s BEC operates in New York.
- **New England—**ISO New England is responsible for managing the New England Power Pool which covers Maine, New Hampshire, Vermont, Massachusetts, Connecticut and Rhode Island. This service area has a population of about 14 million and a peak demand of over 26,000 MW. Power’s Bridgeport and New Haven stations operate in Connecticut.

The pricing of electricity varies by location in each of these markets. Depending upon our production and our obligations, these price differentials can serve to increase or decrease our profitability.

Commodity prices, such as electricity, gas, coal and emissions, as well as the availability of our diverse fleet of generation units to produce these products also have a considerable effect on our profitability. These commodity prices have been, and continue to be, highly volatile.

Since the majority of the power we generate is sourced from lower-cost nuclear and coal units, the rise in electric prices in recent years has yielded higher margins for us. Over a longer-term horizon, if these higher prices are sustained at the levels indicated by the current forward markets, we expect to have an attractive environment in which to contract for the sale of our anticipated output. However, higher prices also increase the cost of replacement power, thereby placing us at risk should any of our generating units fail to function effectively or otherwise become unavailable.

In addition to energy sales, we also earn revenue from capacity payments, through which we are compensated for committing that a portion of our capacity be available to the ISO for dispatch at its discretion. Capacity payments reflect the value to the ISO that at any time there is assurance that sufficient generating capacity is available to meet system reliability and energy requirements. Currently, there is sufficient capacity in the markets in which we operate. However, in certain areas of these markets there are transmission system constraints, raising concerns about reliability and creating a more acute need for capacity. Some generators, including us, announced the retirement of certain older generating facilities in these constrained areas due to insufficient revenues to support their continued operation. To enable the continued availability of these facilities, in separate instances, both PJM and the New England Power Pool (NEPOOL) agreed to enter into Reliability-Must-Run (RMR) contracts to compensate us for those units’ contribution to reliability. By providing for such a payment structure, the ISOs have acknowledged that these units provide a reliability service that is not otherwise compensated for in the existing markets.

Through the implementation of the Reliability Pricing Model (RPM) (the market design for capacity payments in PJM) and the Forward Capacity Market (FCM) (in NEPOOL), the markets in which we operate have changed to provide for a more structured, forward-looking, transparent pricing mechanism. This change is aimed at providing greater clarity regarding the value of capacity, resulting in an improved pricing signal to prospective investors in new generating facilities so as to encourage expansion of capacity to meet future market demands.

The prices to be received by generating units in PJM for capacity have been set through RPM base residual auctions based on the zone in which the generating unit is located. The majority of our PJM generating units are located in zones where the following prices have been set.

| Delivery Year | MW-day | kW-yr |
| --- | ---: | ---: |
| June 2007 to May 2008 | $197.67 | $72.15 |
| June 2008 to May 2009 | $148.80 | $54.31 |
| June 2009 to May 2010 | $191.32 | $69.83 |
| June 2010 to May 2011 | $174.29 | $63.62 |
| June 2011 to May 2012 | $110.00 | $40.16 |

The zone in which our Keystone and Conemaugh units are located experienced fewer constraints on the system, resulting in prices lower than the prices for the rest of our generating assets in the first three auctions. This was not the case for the periods from June 2010 to May 2012 when identical prices were set for all zones.

The price that must be paid by an entity serving load in the various zones is also set through these auctions. These prices can be higher or lower than the prices noted in the table above due to import and export capability to and from lower-priced areas.

The majority of our generating capacity has experienced increases in value from the recent changes in market designs, resulting in significant additional revenue. We cannot determine the long-term sustainability of these market design changes.

On a prospective basis, many factors will affect the capacity pricing in PJM, including but not limited to:

- changes in load and demand;
- changes in the available amounts of demand response resources;
- changes in available generating capacity (including retirements, additions, derates, forced outage rates, etc.);
- increases in transmission capability between zones; and
- changes to the pricing mechanism, including increasing the potential number of zones to create more pricing sensitivity to changes in supply and demand, as well as other potential changes that PJM may propose over time.

For additional information on our collection of RMR payments in PJM and NEPOOL and the RPM and FCM proposals, see Regulatory Issues—Federal Regulation.

### Hedging Strategy

In an attempt to mitigate volatility in our results, we seek to contract in advance for a significant portion of our anticipated electric output, capacity and fuel needs. We seek to sell a portion of our anticipated lower-cost nuclear and coal-fired generation over a multi-year forward horizon, normally over a period of two to three years. We believe this hedging strategy increases stability of earnings.

Among the ways in which we hedge our output are: (1) sales at PJM West and (2) BGS contracts. The BGS-Fixed Price contract, a full requirements contract that includes energy and capacity, ancillary and other services, is awarded for three-year periods through an auction process managed by the New Jersey Board of Public Utilities (BPU). The volume of BGS contracts and the electric utilities our generation operations will serve vary from year to year. Pricing for the BGS contracts for recent and future periods by purchasing utility, including a capacity component, is as follows:

| Load Zone ($/MWh) | 2005-2008 | 2006-2009 | 2007-2010 | 2008-2011 | 2009-2012 |
| --- | ---: | ---: | ---: | ---: | ---: |
| PSE&G | $65.41 | $102.51 | $98.88 | $111.50 | $103.72 |
| Jersey Central Power and Light | $65.70 | $100.44 | $99.64 | $114.09 | $103.51 |
| Atlantic City Electric | $66.48 | $103.99 | $99.59 | $116.50 | $105.36 |
| Rockland Electric Company | $71.79 | $111.14 | $109.99 | $120.49 | $112.70 |

A portion of our total generation capacity is allocated in the BGS contract through the BGS auctions. On average, tranches won in the BGS auctions require 100 MW to 120 MW of capacity on a daily basis. In addition, we hedged a portion of our generation capacity with forward capacity sales contracts.

The capacity prices we contracted for in the 2005-2008 BGS auctions and through some of the forward sales contracts were set prior to the implementation of RPM capacity auctions and therefore do not reflect the capacity prices determined more recently in the RPM capacity auctions. As a result, we were unable to fully realize such pricing for some of our generating capacity. As these older contracts expire, we expect revenues to increase as we realize the RPM auction pricing.

We have obtained price certainty for all of our PJM and New England capacity through May 2012 through these mechanisms.

To support our contracted sales of energy, we also entered into contracts for the future purchase and delivery of nuclear fuel and coal, which include some market-based pricing components. As of February 10, 2009, we had contracted for the following percentages of our nuclear and coal generation output and related fuel supplies for the next three years with modest amounts beyond 2011.

| Nuclear and Coal Generation | 2009 | 2010 | 2011 |
| --- | ---: | --- | --- |
| Generation Sales | 100% | 70%-80% | 30%-50% |
| Nuclear Fuel | 100% | 100% | 100% |
| Coal Supply and Transportation | 90%-100% | 15%-25% | 0%-25% |

We take a more opportunistic approach in hedging our anticipated natural gas-fired generation. The generation from these units is less predictable, as these units are generally dispatched when aggregate market demand has exceeded the supply provided by lower-cost units. The natural gas-fired units have generally provided a lower contribution to our margin than either the nuclear or coal units. We purchase natural gas when gas-fired generation is required to supply forward sale commitments.

In a changing market environment, this hedging strategy may cause our realized prices to differ materially from current market prices. In a rising price environment, this strategy normally results in lower margins than would have been the case if little or no hedging activity had been conducted. Alternatively, in a falling price environment, this hedging strategy will tend to create margins higher than those implied by the then current market.

### PSE&G

Our regulated public utility, PSE&G, distributes electric energy and gas to customers within a designated service territory running diagonally across New Jersey where approximately 5.5 million people, or about 70% of the State’s population, reside.

### Products and Services

Our utility operations primarily earn margins through the transmission and distribution of electricity and the distribution of gas.

- **Transmission—**is the movement of electricity at high voltage from generating plants to substations and transformers, where it is then reduced to a lower voltage for distribution to homes, businesses and industrial customers. Our revenues for these services are based upon tariffs approved by the Federal Energy Regulatory Commission (FERC).
- **Distribution—**is the delivery of electricity and gas to the retail customer’s home, business or industrial facility. Our revenues for these services are based upon tariffs approved by the BPU.

We also earn margins through non-tariff competitive services, such as appliance repair services. The commodity supply portion of our utility business’ electric and gas sales are managed by BGS and BGSS suppliers. Pricing for those services are set by the BPU as a pass-through, resulting in no margin for our utility operations.

In addition to our current utility products and services, we have proposed several programs to improve efficiencies in customer energy use and increase the level of renewable generation to be constructed and owned by us including:

|  |  |
| --- | --- |
| ¡ | a program approved in 2008 to help finance the installation of 30 MW of solar power systems throughout our electric service area, |
| ¡ | a new proposal to develop 120 MW of solar power systems over five years, |

12

|  |  |
| --- | --- |
| ¡ | a proposed energy efficiency stimulus initiative to encourage conservation and energy efficiency and to provide energy and money saving measures directly to businesses and families, and |
| ¡ | a small scale carbon abatement program designed to promote energy efficiency. |

For additional information concerning these proposed programs and the components of our tariffs, see Regulatory Issues.

### How PSE&G Operates

### Transmission

In September 2008, we received FERC approval to use formula transmission rates, effective October 1, 2008, for our existing and future transmission investments. Formula-type rates provide a method of rate recovery where the transmission owner annually determines its revenue requirements through a fixed formula which considers Operations and Maintenance expenditures, Rate Base and capital investments and applies an approved return on equity (ROE). Currently, approved rates provide for a ROE of 11.68% on existing and new transmission investment. FERC has also approved incentive rate treatment for the Susquehanna-Roseland line, which when added to the approved base ROE, will yield a ROE of 12.93% for this particular project. We will also earn this ROE on Construction Work In Progress (CWIP) dollars spent on this project.

*Transmission Statistics*

| December 31, 2008 Network Circuit Miles | Billing Peak (MW) | Historical Annual Growth 2004-2008 |
| ---: | ---: | ---: |
| 1,429 | 10,654 | 1.60% |

For more information on current transmission construction activities, see Regulatory Issues, Federal Regulation—Transmission Regulation.

### Distribution

All electric and gas customers in New Jersey have the ability to choose their own electric energy and/or gas supplier. However, pursuant to BPU requirements, we serve as the supplier of last resort for electric and gas customers within our service territory who have no other supplier. As a practical matter, this means we are obligated to provide supply to a vast majority of residential customers and a smaller portion of commercial and industrial customers.

The percentage of customers we serve as compared to that served by third party suppliers has been reasonably stable over the past several years. As shown in the table below, we continue to provide the electric energy and gas supply for the majority of the customers in our service territory for the year ended December 31, 2008.

|  | Electric GWh% |  | Gas Million Therms% |  |
| --- | ---: | ---: | ---: | ---: |
| PSE&G | 33,702 | 77% | 2,139 | 62% |
| Third Party Suppliers | 10,018 | 23% | 1,302 | 38% |
| **Total Delivered** | **43,720** | **100%** | **3,441** | **100%** |

13

Our load requirements were split during 2008 among residential, commercial and industrial customers, described below. We believe that we have all the non-exclusive franchise rights (including consents) necessary for our electric and gas distribution operations in the territory we serve.

| Customer Type | % of Sales Electric | Gas |
| --- | ---: | ---: |
| Commercial | 57% | 36% |
| Residential | 31% | 60% |
| Industrial | 12% | 4% |
| **Total** | **100%** | **100%** |

We procure the supply to meet our BGS obligations through two concurrent auctions authorized by the BPU for New Jersey’s total BGS requirement. These auctions take place annually in February. Results of these auctions determine which energy suppliers are authorized to supply BGS to New Jersey’s electric distribution companies (EDCs). Once validated by the BPU, electricity prices for BGS service are set.

BGSS is the mechanism approved by the BPU designed to recover all gas costs related to the supply for residential customers. BGSS filings are made annually by June 1 of each year, with an effective date of October 1. PSE&G has a full requirements contract through 2012 with Power to meet the supply requirements of our default service gas customers. Gas commodity costs under this contract are recovered from our customers. Any difference between rates charged under the BGSS contract and rates charged to our residential customers is deferred and collected or refunded through adjustments in future rates.

While our customer base has remained steady, electric load has been fairly flat and gas load has declined, as illustrated:

*Electric and Gas Distribution Statistics*

|  | December 31, 2008 Number of Customers | Electric Sales and Gas Sold and Transported | Historical Annual Load Growth 2004-2008 |
| --- | --- | --- | ---: |
| Electric | 2.1 Million | 43,720 GWh | 0.08% |
| Gas | 1.7 Million | 3,441 Million Therms | -3.50% |

### Markets and Market Pricing

There continues to be significant volatility in commodity prices. Such volatility can have a considerable impact on us since a rising commodity price environment results in higher delivered electric and gas rates for customers. This may result in decreased demand for both electricity and gas, increased regulatory pressures and greater working capital requirements as the collection of higher commodity costs may be deferred under our regulated rate structure. For additional information see Item 7. MD&A.

### Energy Holdings

Through Energy Holdings, we own domestic generation outside of the Mid Atlantic region and own and manage passive energy-related investments. We are also pursuing an offshore wind project and a modest amount of solar and other renewable projects, primarily in our core markets.

### Products and Services

We own 2,395 MW of domestic capacity in areas outside of the Mid Atlantic region, of which 2,000 MW comes from two 1,000 MW gas-fired, combined cycle generation facilities in Texas. The majority of our investments in international generation and distribution projects have been sold.

Our passive energy-related investments consist primarily of leveraged leases. As of December 31, 2008, the single largest lease investment represented 13% of total leveraged leases.

### How Energy Holdings Operates

Approximately 37% of the expected output of our Texas facilities for 2009 has been sold via bilateral agreements. Additional bilateral sales for peak and off-peak services are expected to be signed as the year progresses. Any remaining uncommitted economic output will be offered in the Texas spot market. Included in these bilateral agreements is a 350 MW daily capacity call option at Odessa that expires on December 31, 2010.

In August 2008, we invested in a joint venture to further develop compressed air energy storage (CAES) technology. CAES technology stores energy in the form of compressed air by injection into underground caverns or above ground storage facilities which can then be released to generate electricity through specialized turbine equipment. This technology could be used to optimize an intermittent energy source, such as wind, by storing energy at night and releasing this stored energy during the day when customers need power. Our plan is to use the technology to develop CAES power plants and sell licenses to third parties to implement CAES technology.

In October 2008, the New Jersey Office of Clean Energy (OCE) awarded a $4 million grant to a joint venture owned equally by one of our subsidiaries and an unaffiliated private developer, to advance the development of a 350 MW wind farm to be located approximately 16 miles off the shore of southern New Jersey. An offshore wind farm has not yet been developed and constructed in the U.S. Numerous issues, including federal and state permitting, environmental impacts, power output sale arrangements, construction approach and expected maintenance costs, will need to be worked through in order to successfully develop such a project. If these issues are satisfactorily addressed and the joint venture decides to proceed, the wind farm could be fully operational in 2013.

Our leasing portfolio is designed to provide a fixed rate of return. Income on leveraged leases is recognized by a method which produces a constant rate of return on the outstanding investment in the lease, net of the related deferred tax liability, in the years in which the net investment is positive. Any gains or losses incurred as a result of a lease termination are recorded as Operating Revenues as these events occur in the ordinary course of business of managing the investment portfolio.

Leveraged lease investments involve three parties: an owner/lessor, a creditor and a lessee. In a typical leveraged lease financing, the lessor purchases an asset to be leased. The purchase price is typically financed 80% with debt provided by the creditor and the balance comes from equity funds provided by the lessor. The creditor provides long-term financing to the transaction secured by the property subject to the lease. Such long-term financing is non-recourse to the lessor and, with respect to our lease investments, is not presented in our Consolidated Balance Sheets.

The lessor acquires economic and tax ownership of the asset and then leases it to the lessee for a period of time no greater than 80% of its remaining useful life. As the owner, the lessor is entitled to depreciate the asset under applicable federal and state tax guidelines. The lessor receives income from lease payments made by the lessee during the term of the lease and from tax benefits associated with interest and depreciation deductions with respect to the leased property. The ability to realize these tax benefits is dependent on operating gains generated by our other operating subsidiaries and allocated pursuant to the consolidated tax sharing agreement between us and our operating subsidiaries. During 2008, we recorded after-tax charges of $490 million related to tax deductions previously claimed for certain of these leases that were recently disallowed by the Internal Revenue Service (IRS). See Note 11. Commitments and Contingent Liabilities for further discussion.

Lease rental payments are unconditional obligations of the lessee and are set at levels at least sufficient to service the non-recourse lease debt. The lessor is also entitled to any residual value associated with the leased asset at the end of the lease term. An evaluation of the after-tax cash flows to the lessor determines the return on the investment. Under GAAP, the lease investment is recorded net of non-recourse debt and income is recognized as a constant return on the net unrecovered investment.

For additional information on leases, including the credit, tax and accounting risks related to certain lessees, see Item 1A. Risk Factors, Item 7. MD&A—Results of Operations—Energy Holdings, Item 7A. Qualitative and Quantitative Disclosures About Market Risk—Credit Risk—Energy Holdings and Note 11. Commitments and Contingent Liabilities.

### Markets and Market Pricing

Our generation business in Texas is a merchant generation business located in the Electric Reliability Council of Texas (ERCOT) market. In balancing energy and ancillary service markets, an ISO will generally dispatch the lowest bids first unless local transmission congestion requires units to be dispatched out of merit order. The price that all dispatched units receive is set by the last, or marginal bidder that is dispatched. Our Texas generation assets are combined cycle gas-fired generation units and generally have lower variable costs than less efficient single cycle gas and oil-fired generation units. As a result, during on-peak periods, the price of power in ERCOT is frequently set by generation units with higher variable costs than our Texas generation assets. Unlike the other markets in which we compete, ERCOT does not have a capacity market, and as a result, all generators are compensated solely through energy revenues and revenues for ancillary services, which are subject to substantial volatility as power prices fluctuate.

ERCOT has decided to delay a proposed transition from a zonal market to a nodal wholesale market until the fourth quarter of 2010 at the earliest. As proposed, the redesigned grid will consist of more than 4,000 nodes replacing the current four congestion management zones. The implementation of the new design is expected to deliver improved price signals, improved dispatch efficiencies and direct assignment of local congestion. We will continue to evaluate the potential impact this change will have on our Texas generation facilities once implemented.

### COMPETITIVE ENVIRONMENT

### Power

Various market participants compete with us and one another in buying and selling in wholesale power pools, entering into bilateral contracts and selling to aggregated retail customers. Our competitors include:

- merchant generators,
- domestic and multi-national utility generators,
- energy marketers,
- banks, funds and other financial entities,
- fuel supply companies, and
- affiliates of other industrial companies.

Our business is also under competitive pressure due to demand side management (DSM) and other efficiency efforts aimed at changing the quantity and patterns of usage by consumers which could result in a reduction in load requirements. A reduction in load requirements can also be caused by economic cycles and factors. It is also possible that advances in technology, such as distributed generation, will reduce the cost of alternative methods of producing electricity to a level that is competitive with that of most central station electric production. To the extent that additions to the transmission system relieve or reduce congestion in eastern PJM where most of our plants are located, our revenues could be adversely affected. In addition, pressures from renewable resources, such as wind and solar, could increase over time, especially if government incentive programs continue to grow.

We are also at risk if one or more states in which we operate should decide to turn away from competition and allow regulated utilities to continue to own or reacquire and operate generating stations in a regulated and potentially uneconomical manner, or to encourage rate-based generation for the construction of new base load units. This has occurred in certain states. The lack of consistent rules in energy markets can negatively impact the competitiveness of our plants. Also, regional inconsistencies in environmental regulations, particularly those related to emissions, have put some of our plants which are located in the

Northeast, where rules are more stringent, at an economic disadvantage compared to our competitors in certain Midwest states.

Also, environmental issues such as restrictions on carbon dioxide (CO2) emissions and other pollutants may have a competitive impact on us to the extent it is more expensive for our plants to remain compliant, thus affecting our ability to be a lower-cost provider compared to competitors without such restrictions.

### PSE&G

The electric and gas transmission and distribution business has minimal risks from competitors. Our transmission and distribution business is minimally impacted when customers choose alternate electric or gas suppliers since we earn our return by providing transmission and distribution service, not by supplying the commodity. The demand for electric energy and gas by customers is affected by customer conservation, economic conditions, weather and other factors not within our control.

### Energy Holdings

New additions of lower cost or more efficient generation capacity in Texas could make our plants in the region less economical in the future. A number of competitors have announced plans to build additional coal-fired and gas-fired generation capacity in ERCOT. Although it is not clear if this capacity will be built or, if so, what the economic impact will be, such additions could impact market prices and our competitiveness.

Over the past several years, substantial amounts of wind generation capacity have been constructed in ERCOT, particularly in western Texas, where our Odessa generation facility is located. At the end of 2008, ERCOT had approximately 8,000 MW of installed wind capacity. Given the favorable wind conditions in western Texas, these wind generation facilities are able to produce power during a substantial period of the year, resulting in an additional source of base load power in western Texas, especially during off-peak seasons.

While numerous competitors have announced plans to build substantial amounts of new wind generation capacity, an issue impacting the likelihood of these projects being built is the constrained amount of transmission capacity between western Texas, where wind generation units are typically sited but where power demand is relatively low, and the rest of Texas.

The Public Utility Commission of Texas (PUCT) has designated five Competitive Renewable Energy Zones in western Texas and the Texas Panhandle in an effort to address the constraint issue. The PUCT has requested that ERCOT develop transmission construction options within these zones that would allow for much greater levels of delivery of wind power from western Texas to customers throughout the ERCOT grid. Although it is not clear if these efforts at transmission expansion will be successful or, if so, what the economic impact will be, it is possible that substantial additional amounts of wind generation will be built in ERCOT as a result of such potential transmission expansion, which could impact market prices and our competitiveness.

### EMPLOYEE RELATIONS

The following table provides summarized information about our employees as of December 31, 2008. We believe that we maintain satisfactory relationships with our employees.

*Employees as of December 31, 2008*

|  | Power | PSE&G | Energy Holdings | Services |
| --- | ---: | ---: | ---: | ---: |
| Non-Union | 1,126 | 1,231 | 112 | 1,032 |
| Union | 1,412 | 4,838 | — | 98 |
| **Total Employees** | **2,538** | **6,069** | **112** | **1,130** |
| Number of Union Groups | 3 | 4 | n/a | 1 |
| Bargaining Agreement Expiration Year | 2011 | 2011 | n/a | 2011 |

17

### REGULATORY ISSUES

### Federal Regulation

### FERC

The FERC is an independent federal agency that regulates the transmission of electric energy and gas in interstate commerce and the sale of electric energy and gas at wholesale pursuant to the Federal Power Act (FPA) and the Natural Gas Act. PSE&G and certain subsidiaries of Power and Energy Holdings are public utilities as defined by the FPA. By virtue of its regulation of (a) interstate electric and gas transmission and (b) wholesale sales of electricity and gas, the FERC has extensive oversight over “public utilities” as defined by the FPA. FERC approval is usually required when a “public utility” company seeks to: sell or acquire an asset that is regulated by the FERC (such as a transmission line or a generating station); collect costs from customers associated with a new transmission facility; charge a rate for wholesale sales under a contract or tariff; or engage in certain mergers and internal corporate reorganizations.

The FERC also regulates generating facilities known as qualifying facilities (QFs). QFs are cogeneration facilities that produce electricity and another form of useful thermal energy, or small power production facilities where the primary energy source is renewable, biomass, waste, or geothermal resources. QFs must meet certain ownership, operating and efficiency criteria established by the FERC. Through Energy Holdings, we own several QF plants. QFs are subject to many, but not all, of the same FERC requirements as public utilities.

For us, the major effects of FERC regulation fall into four general categories:

- Regulation of Wholesale Sales—Generation/Market Issues
- Capacity Market Issues
- Transmission Regulation
- Compliance

***Regulation of Wholesale Sales—Generation/Market Issues***

|  |  |
| --- | --- |
| • | Market Power—Under FERC regulations, public utilities must receive FERC authorization to sell power in interstate commerce. They can sell power at cost-based rates or apply to the FERC for authority to make market based rate (MBR) sales. For a requesting company to receive MBR authority, the FERC must first make a determination that the requesting company lacks market power in the relevant markets. The FERC requires that holders of MBR tariffs file an update every three years demonstrating that they continue to lack market power. |
|  | PSE&G and certain subsidiaries of Power and Energy Holdings have received MBR authority from the FERC. Retention of MBR authority is critical to the maintenance of our generation business’ revenues. |
|  | Under new MBR rules issued in 2007, the FERC may look at sub-markets to analyze whether a company possesses market power. Applying these new rules in October 2008, the FERC granted both PSE&G and PSEG Energy Resources & Trade LLC continued MBR authority and granted both PSEG Fossil LLC and PSEG Nuclear LLC initial MBR authority. |
| • | Cost-Based RMR Agreements—The FERC has permitted public utility generation owners to enter into RMR agreements that provide cost-based compensation to a generation owner when a unit proposed for retirement is asked to continue operating for reliability purposes. Our Hudson 1 generating station is currently operating under an RMR agreement which expires September 2010. However, pursuant to the request of PJM, we will be extending this agreement until September 2011. For additional information, see Note 11. Commitments and Contingent Liabilities. |

18

|  |  |
| --- | --- |
|  | In NEPOOL, many owners of generation facilities have also filed for RMR treatment. We currently collect FERC-approved monthly payments for the Bridgeport Harbor Station Unit 2 and the New Haven Harbor Station. These agreements are scheduled to expire in June 2010. |
|  | RMR treatment has enabled these units to continue to operate. Various parties have challenged the continuation of RMR payments in NEPOOL, and thus, there is risk that such payments may be terminated prior to the end of the contract terms. |
| • | Reactive Power—Reactive power encompasses certain ancillary services necessary to maintain voltage support and operate the system. In May 2008, we filed with FERC to increase our annual fixed revenues by $18 million to reflect our provision of reactive power support in PJM. In November 2008, FERC accepted our reactive power rate filing retroactive to May 2008. |

### Capacity Market Issues

RPM is a locational installed capacity market design for the PJM region, including a forward auction for installed capacity. Under RPM, generators located in constrained areas within PJM are paid more for their capacity as an incentive to locate in areas where generation capacity is most needed. PJM’s RPM has been challenged in court.

In early 2006, certain interested market participants in New England agreed to a settlement that establishes the design of the region’s market for installed capacity and which is being implemented gradually over four years. Commencing in December 2006, all generators in New England began receiving fixed capacity payments that escalate gradually over the transition period. The market design consists of a forward-looking auction for installed capacity that is intended to recognize the locational value of generators on the system and contains incentive mechanisms to encourage generator availability during generation shortages. Capacity market rules in both PJM and in New England may change in the future.

### Transmission Regulation

The FERC has exclusive jurisdiction to establish the rates and terms and conditions of service for interstate transmission. We currently have FERC-approved formula rates in effect to recover the costs of our transmission facilities. Under this formula, rates are put into effect in January of each year based upon our internal forecast of annual expenses and capital expenditures. Rates are then trued up the following year to reflect actual annual expenses/capital expenditures. Our allowed ROE is 11.68% for both existing and new transmission investments, and we have received incentive rates—affording a higher return on equity—for specific transmission investments.

|  |  |
| --- | --- |
| • | Transmission Expansion—In June 2007, PJM approved the construction of the Susquehanna-Roseland line, a new 500 kV transmission line intended to maintain the reliability of the electrical grid serving New Jersey customers. PJM assigned construction responsibility for the new line to us and PPL for the New Jersey and Pennsylvania portions of the project, respectively. The estimated cost of our portion of this construction project is approximately $750 million, and PJM has directed that the line be placed into service by June 2012. We have recently filed with the BPU to obtain authorization to construct the Susquehanna-Roseland line. For further discussion, see State Regulation—Energy Policy—Susquehanna-Roseland BPU Petition. |
|  | Construction of the Susquehanna-Roseland line is contingent upon obtaining all necessary federal, state, municipal and landowner permits and approvals. The construction of the line has encountered local opposition. Should the line be cancelled for reasons beyond our control, we will be entitled to recover 100% of prudently-incurred abandonment costs. |
|  | PJM has also approved the construction of a 500 kV transmission line running from Virginia through Maryland and Delaware and is still considering approval of the portion terminating in Salem Township, New Jersey. We will be responsible for constructing and operating a portion of this line, known as the Mid-Atlantic Pathway Project (MAPP), if approved. We have asked the FERC to approve a 150 basis point ROE adder for this project, 100% recovery of abandonment costs and the ability to transfer the project to an affiliate. Several state consumer advocates, including the New |

19

Jersey Division of Rate Counsel, have opposed the incentive rate filing and have requested that the FERC set the matter for hearing. This filing is pending at the FERC.

In December 2008, PJM approved another transmission project, including two additional 500 kV transmission lines. The first would run from Branchburg to Roseland, and the second from Roseland to Hudson. These lines are still in the design phase.

***U.S. Department of Energy (DOE) Congestion Study—National Interest Electric Transmission Corridors and FERC Back-Stop Siting Authority—***By virtue of the Energy Policy Act enacted by Congress in 2005, the DOE has the ability to designate transmission corridors in areas found to be critical congestion areas, which then gives the FERC the ability to site transmission projects within these corridors should certain events occur.

In October 2007, the DOE acted to designate transmission corridors within these critical congestion areas. One of the designated corridors is the Mid-Atlantic Area National Corridor. Thus, entities seeking to build transmission within the Mid-Atlantic Area Corridor, which includes New Jersey, most of Pennsylvania and New York, may be able to use the FERC’s back-stop siting authority in the future under certain circumstances, if necessary, to site transmission, including with respect to the Susquehanna-Roseland line. On February 18, 2009, the United States Court of Appeals for the Fourth Circuit narrowed the scope of the FERC’s back-stop siting authority, which may lead to future legislative changes in this area.

### Compliance

- ***Reliability Standards—***Congress has required the FERC to put in place, through the North American Electric Reliability Council (NERC), national and regional reliability standards to ensure the reliability of the U.S. electric transmission and generation system and to prevent major system blackouts. Many reliability standards have been developed and approved. Since these standards are mandatory and applicable to, among other entities, transmission owners and generation owners and operators, and thus several of our operating subsidiaries, we are obligated to comply with the standards and to ensure continuing compliance. In 2008, our Texas generation plants were audited for NERC Reliability Standards and were found to be in compliance. PSE&G was also audited for NERC Reliability Standards compliance in November 2008, and we are awaiting a final determination on the audit.
- ***FERC Standards of Conduct—***On October 16, 2008, FERC issued a revised rule governing the interaction between transmission provider employees and wholesale merchant employees, which revises FERC’s Standards of Conduct by abandoning the “corporate” separation approach to regulating these interactions and instead adopting an “employee function” approach, which focuses on an individual employee’s job functions in determining how the rules will apply. The effect of these rules will be to permit more affiliate communication with respect to corporate and strategic planning, to loosen restrictions on senior officers and directors and to permit necessary operational communications between those employees engaged in transmission system operations and planning and those employees engaged in generating plant operations. This rule became effective in November 2008, with full compliance required by the FERC during the first quarter of 2009. We expect to be able to comply with these new rules.

### Nuclear Regulatory Commission (NRC)

Our operation of nuclear generating facilities is subject to comprehensive regulation by the NRC, a federal agency established to regulate nuclear activities to ensure protection of public health and safety, as well as the security and protection of the environment. Such regulation involves testing, evaluation and modification of all aspects of plant operation in light of NRC safety and environmental requirements. Continuous demonstration to the NRC that plant operations meet requirements is also necessary. The NRC has the ultimate authority to determine whether any nuclear generating unit may operate. We anticipate filing for extensions of operating licenses for the Salem and Hope Creek facilities in 2009. The current operating licenses of our nuclear facilities expire in the years shown below:

| Unit | Year |
| --- | --- |
| Salem Unit 1 | 2016 |
| Salem Unit 2 | 2020 |
| Hope Creek | 2026 |
| Peach Bottom Unit 2 | 2033 |
| Peach Bottom Unit 3 | 2034 |

### State Regulation

Since our operations are primarily located within New Jersey, our main state regulator is the BPU. The BPU is the regulatory authority that oversees electric and natural gas distribution companies in New Jersey. PSE&G is subject to comprehensive regulation by the BPU including, among other matters, regulation of retail electric and gas distribution rates and service and the issuance and sale of certain types of securities. BPU regulation can also have a direct or indirect impact on our power generation business as it relates to energy supply agreements and energy policy in New Jersey.

We are also subject to some state regulation in California, Connecticut, Hawaii, New Hampshire, New York, Pennsylvania and Texas due to our ownership of generation and transmission facilities in those states.

### Rates

- ***Electric and Gas Base Rates—***We must file electric and gas base rate cases with the BPU in order to change PSE&G’s base rates. The BPU also has authority to seek to adjust rates downward if it believes the rates are no longer just and reasonable. Under our current BPU Order, we may not seek new base rates to be effective prior to November 15, 2009. We also must file a joint electric and gas petition for any future base rate increases. We expect to file a joint electric and gas rate case by mid 2009 with a request that rates become effective in 2010.
- ***Rate Adjustment Clauses—***In addition to base rate determinations, we recover certain costs from customers pursuant to mechanisms, known as adjustment clauses. These permit, at set intervals, the flow-through of costs to customers related to specific programs, outside the context of base rate case proceedings. Recovery of these costs are subject to BPU approval. Costs associated with these programs are deferred when incurred and amortized to expense when recovered in revenues. Delays in the pass-through of costs under these clauses can result in significant changes in cash flow. Our SBC and NGC clauses are detailed in the following table:

| Rate Clause | 2008 Revenue | (Over) Under Recovered Balance as of December 31, 2008 Millions |
| --- | ---: | ---: |
| Energy Efficiency and Renewable Energy | $179 | $9 |
| RAC | 16 | 134 |
| USF | 152 | 34 |
| Social Programs | 33 | 32 |
| **Total SBC** | **380** | **209** |
| NGC | 59 | (9) |
| **Total** | **$439** | **$200** |

***Societal Benefits Charges (SBC)—***The SBC is a mechanism designed to ensure recovery of costs associated with activities required to be accomplished to achieve specific government-mandated public policy determinations. The programs that are covered by the SBC (gas and electric) are energy efficiency and renewable energy programs, Manufactured Gas Plant RAC and the Universal Service Fund (USF). In addition, the electric SBC includes a Social Programs component. All components include interest on both over and under recoveries.

***Non-utility Generation Charge (NGC)—***The NGC recovers the above market costs associated with the long-term power purchase contracts with non-utility generators approved by the BPU.

***Recent Rate Adjustments—USF/Lifeline—***On October 21, 2008, we received an Order to reset rates for the USF and the Lifeline program to recover $85 million and $61 million for USF electric and gas, respectively and $28 million and $16 million for Lifeline electric and gas, respectively. The new rates were effective October 24, 2008.

***SBC/NGC—***On December 8, 2008, the BPU issued its final order approving an electric SBC/NGC rate increase of $89.7 million on an annual basis and a gas SBC increase of $15.3 million. The new rates were effective December 9, 2008. As part of the order, we were required to write off $1.4 million of previously deferred SBC costs.

On February 9, 2009, we filed a petition requesting a decrease in our electric SBC/NGC rates of $18.9 million and an increase in gas SBC rates of $3.7 million. This matter is expected to be transferred to the Office of Administrative Law (OAL) for potential evidentiary hearings.

***RAC—***On October 3, 2008, the BPU issued an order approving a settlement and affirming recovery of our RAC 15 costs of $36 million incurred from August 1, 2006 through July 31, 2007.

On December 1, 2008, we filed a RAC 16 petition with the BPU requesting an Order which would increase our current gas RAC rates by approximately $8.9 million on an annual basis and increase our current electric RAC rates by approximately $7.6 million on an annual basis. This matter has been transferred to the OAL for evidentiary hearings.

### Energy Supply

|  |  |
| --- | --- |
| • | BGS—New Jersey’s EDCs provide two types of BGS, the default electric supply service for customers who do not have a third party supplier. The first type, which represents about 80% of PSE&G’s load requirements, provides default supply service for smaller industrial and commercial customers and residential customers at seasonally-adjusted fixed prices for a three-year term (BGS-Fixed Price). These rates change annually on June 1, and are based on the average price obtained at auctions in the current year and two prior years. The second type provides default supply for larger customers. However, energy is priced at hourly PJM real-time market prices and the term of the contract is 12 months. |
|  | All of New Jersey’s EDCs jointly procure the supply to meet their BGS obligations through two concurrent auctions authorized each year by the BPU for New Jersey’s total BGS requirement. These auctions take place annually in February. Results of these auctions determine which energy suppliers are authorized to supply BGS to New Jersey’s EDCs. PSE&G earns no margin on the provision of BGS. |
|  | PSE&G’s total BGS-Fixed Price load is expected to be approximately 8,700 MW. Approximately one-third of this load is auctioned each year for a three-year term. Current pricing is as follows: |

| 36 Month Term Ending | 2006 May 2009 | 2007 May 2010 | 2008 May 2011 | 2009 May 2012 |
| --- | ---: | ---: | ---: | ---: |
| Load (MW) | 2,882 | 2,758 | 2,840 | 2,840 |
| $ per kWh | $0.10251 | $0.09888 | $0.11150 | $0.10372 |

(a) Prices set in the February 2009 BGS Auction are effective on June 1, 2009 when the 36-month (May 2009) supply agreements expire.

For additional information, see Note 5. Regulatory Assets and Liabilities and Note 11. Commitments and Contingent Liabilities.

***BGSS—***BGSS is the mechanism approved by the BPU designed to recover all gas costs related to the supply for residential customers. BGSS filings are made annually by June 1 of each year, with an effective date of October 1. Revenues are matched with costs using deferral accounting, with the goal of achieving a zero cumulative balance by September 30 of each year. In addition, we have the ability to put in place two self-implementing BGSS increases on December 1 and February 1 of up to 5% and also may reduce the BGSS rate at any time.

PSE&G has a full requirements contract through 2012 with Power to meet the supply requirements of default service gas customers. Power charges PSE&G for gas commodity costs which PSE&G recovers from customers. Any difference between rates charged by Power under the BGSS contract and rates charged to PSE&G’s residential customers are deferred and collected or refunded through adjustments in future rates. PSE&G earns no margin on the provision of BGSS.

In May 2008, PSE&G requested an increase in annual BGSS revenue of $376 million, excluding Sales and Use Tax, to be effective October 1, 2008. Since that time, due to the significant downward trend in wholesale natural gas prices, we filed two revisions to the BGSS increase, a revised Stipulation (increase of 14% or $267 million) and also a BGSS self-implementing decrease (5% or approximately $108 million). The increase in the BGSS-Residential Service Gas (RSG) rate became effective on October 3, 2008 and the decrease became effective on January 1, 2009.

### Energy Policy

- ***New Jersey Energy Master Plan (EMP)—***New Jersey law requires that an EMP be developed every three years, the purpose of which is to ensure safe, secure and reasonably-priced energy supply, foster economic growth and development and protect the environment. The most recent EMP was finalized in October 2008. The plan identifies a number of the actions to improve energy efficiency, increase the use of renewable resources, ensure a reliable supply of energy and stimulate investment in clean energy technologies, including to:

|  |  |
| --- | --- |
| ¡ | maximize energy conservation and energy efficiency to reduce New Jersey’s projected energy use 20% by the year 2020; |
| ¡ | reduce prices by decreasing peak demand 5,700 MW by 2020; |
| ¡ | strive to achieve 30% of the state’s electricity needs from renewable sources by 2020; |
| ¡ | develop at least 3,000 MW of off-shore wind generation by 2020, |
| ¡ | develop new low carbon-emitting, efficient power plants to help close the gap between the supply and demand of electricity; |
| ¡ | invest in innovative clean energy technologies and businesses to stimulate the industry’s growth and green job development in New Jersey; |
| ¡ | work with electric and gas utilities to develop individual utility master plans through 2020 to evaluate options to modernize the electrical grid; |
| ¡ | establish a state energy council; and |
| ¡ | conduct a complete review of the BGS auction process. |

Consistent with the EMP, we have proposed several programs in filings with the BPU addressing different components of the EMP goals, and have submitted a number of strategies designed to improve efficiencies in customer use and increase the level of renewable generation in the State.

- ***Solar Initiative—***In 2007, we filed a plan with the BPU designed to spur investment in solar power in New Jersey and meet energy goals under the EMP. This program received final BPU approval and a written BPU order in April 2008. Under the plan, our utility business will invest

|  |  |
| --- | --- |
|  | approximately $105 million over two years in a pilot program to help finance the installation of 30 MW of solar systems throughout its electric service area by providing loans to customers for the installation of solar photovoltaic systems on their premises. The borrowers can repay the loans over a period of either 10 years (for residential customer loans) or 15 years by providing us with solar renewable energy certificates. Borrowers will also have the option to repay the loans with cash. The program is designed to fulfill approximately 50% of the BPU’s Renewal Portfolio Standard requirements in our utility service area in May 2009 and May 2010. |
|  | In February 2009, we filed a new solar initiative with the BPU. This initiative is called the Solar 4 All Program. Through this program, we seek to invest approximately $773 million to develop 120 MW of solar photovoltaic (PV) systems over a five year horizon. The program consists of four segments: a centralized PV system (35MW); solar systems installed in distribution system poles (40MW), roof-mounted systems installed on local government buildings in our electric service territory (43MW) and roof-mounted solar systems installed in New Jersey Housing and Mortgage Finance Agency affordable housing communities (2MW). This program is under review by the BPU. |
| • | Carbon Abatement Program—In June 2008, we filed a petition for approval for a small scale carbon abatement program with the BPU, under which we propose to invest up to $46 million over four years in programs across specific customer segments. The program is designed to support EMP goals and promote energy efficiency. The BPU approved a settlement with new rates going into effect on January 1, 2009. |
| • | Demand Response (DR)—In July 2008, the BPU directed that DR programs be implemented by each of New Jersey’s electric utilities beginning in June 2009. In its order, the BPU established target goals to increase DR by 300 MW for the first year of the program and a total increase of 600 MW by the end of the third year and stated that 55% of the target would be our responsibility. In response, we filed our program proposal and identified $93.4 million of demand response investment over a period of four years, seeking full recovery of the program costs, including a return on our investment, through rates. |
|  | In September 2008, the BPU voted to defer action on our program (and the proposed programs of the other New Jersey utilities) and to reconvene its working group which will focus on enrolling, with additional incentives, more New Jersey-based demand response in already-existing programs of PJM, in which our role would be limited. It is possible that the BPU may still act to approve all, or at least a portion, of our filing, but the outcome of this proceeding cannot be predicted. |
|  | On December 10, 2008, the BPU issued an order directing each of the State’s electric utilities to implement a one-year demand response program in their respective service territories. The targeted amount of demand response for this program is 600 MW statewide, with a budget of $4.9 million, which represents an incentive in addition to PJM’s existing DR service programs. The utilities’ role is limited to collecting the program costs, plus administrative costs, through rates, and making the incentive payment to the DR service providers after PJM and the BPU direct the utilities to do so. |
| • | Energy Efficiency Economic Stimulus Program—On January 21, 2009, we filed for approval of an energy efficiency economic stimulus program, under which we proposed to spend $190 million to encourage conservation and create green jobs. This filing is in direct response to a call from New Jersey’s Governor to invigorate the economy as part of the State’s economic assistance and recovery plan. The Economic Energy Efficiency Stimulus Program filing was made under New Jersey’s Regional Greenhouse Gas Initiative (RGGI) legislation, which encourages utilities to invest in conservation and energy efficiency programs as part of their regulated business. |
|  | The new expanded energy efficiency initiative offers programs for various targeted customer segments. Sub-programs for residential homes and small businesses in Urban Enterprise Zone municipalities, multi-family buildings, hospitals, data centers and governmental entities provide audits at no cost to identify energy efficiency measures. Customers could be eligible for incentives toward the installation of the energy efficiency measures. Other components include a program that provides |

24

|  |  |
| --- | --- |
|  | funding for new technologies and demonstration projects, and a program to encourage non-residential customers to reduce energy use through improvements in the operation and maintenance of their facilities. |
| • | Capital Economic Stimulus Infrastructure Program—On January 21, 2009, we also filed for approval of a capital economic stimulus infrastructure investment program and an associated cost recovery mechanism. Under this initiative, we propose to undertake $698 million of capital infrastructure investments for electric and gas programs over a 24 month period. These investments would be subject to deferred accounting and recovered through a new Capital Adjustment Mechanism. The goal of these accelerated capital investments is to help improve the State’s economy through the creation of new employment opportunities. While this filing was made in response to the Governor of New Jersey’s proposal to help revive the economy through job growth and capital spending, the outcome of this filing cannot be predicted at this time. |
| • | Susquehanna-Roseland BPU Petition—In January 2009, we filed a Petition with the BPU seeking authorization from the BPU to construct the New Jersey portion of the Susquehanna-Roseland line. The New Jersey portion of the line spans approximately 45 miles and crosses through 16 municipalities. The Petition seeks a finding from the BPU that municipal land use and zoning ordinances of these municipalities do not apply to this line. In this Petition and accompanying testimony, we explain the need for the line—that it is required to address 23 PJM-identified reliability violations—and we address issues such as engineering and design, route selection, construction impacts, property rights, environmental impacts and public outreach. The first prehearing conference in this proceeding is scheduled for February 26, 2009, at which time a procedural schedule will be established. |

### Compliance

The BPU has statutory authority to conduct periodic audits of our utility’s operations and its compliance with applicable affiliate rules and competition standards. The BPU has retained consultants to conduct periodic combined management/competitive service audits of New Jersey utilities and we could be subject to various audits in 2009.

- ***Gas Purchasing Strategies Audit—***In 2007, the BPU engaged a contractor to perform an analysis of the gas purchasing practices and hedging strategies of the four New Jersey gas distribution companies (GDCs). The primary focus was to examine and compare the financial and physical hedging policies and practices of each company and to provide recommendations for improvements to these policies and practices. The audit included a detailed review of gas hedging practices, including discovery and management interviews. A report including findings and recommendations for all four GDCs and each GDC’s comments and suggestions was provided to Rate Counsel who also provided comments. On February 24, 2009, the BPU accepted the final audit report and recommended that the findings be used as a starting point for future changes to each GDC’s hedging program.
- ***Deferral Audit—***The BPU Energy and Audit Division conducts audits of deferred balances. A draft Deferral Audit—Phase II report relating to the 12-month period ended July 31, 2003 was released by the consultant to the BPU in April 2005. For additional information regarding PSE&G’s Deferral Audit, see Item 1A. Risk Factors and Note 11. Commitments and Contingent Liabilities.
- ***RAC Audit—***On February 4, 2008, the BPU’s Division of Audits commenced a review of the RAC program for the RAC 12, 13 and 14 periods encompassing August 1, 2003 through July 31, 2006. Total RAC costs associated with this period were $83 million. The BPU has not issued a final order or report. We cannot predict the final outcome of this audit.

### ENVIRONMENTAL MATTERS

Our operations are subject to environmental regulation by federal, regional, state and local authorities. These environmental laws and regulations impact the manner in which our operations currently are conducted as well as impose costs on us to address the environmental impacts of historical operations that may have been in full compliance with the legal requirements in effect at the time those operations were conducted.

Areas of regulation may include, but are not limited to:

- air pollution control,
- water pollution control,
- hazardous substance liability,
- fuel and waste disposal, and
- climate change.

To the extent that environmental requirements are more stringent and compliance more costly in certain states where we operate compared to other states that are part of the same market, such rules may impact our ability to compete within that market. Due to evolving environmental regulations, it is difficult to project expected costs of compliance and their impact on competition. For additional information related to environmental matters, including anticipated expenditures for installation of pollution control equipment, hazardous substance liabilities and fuel and waste disposal costs, see Item 1A. Risk Factors, Item 3. Legal Proceedings and Note 11. Commitments and Contingent Liabilities.

### Air Pollution Control

The Clean Air Act and its regulations require controls of emissions from sources of air pollution and also impose record keeping, reporting and permit requirements. Facilities that we operate or in which we have an ownership interest are subject to these federal requirements, as well as requirements established under state and local air pollution laws applicable where those facilities are located. Capital costs of complying with air pollution control requirements through 2010 are included in our estimate of construction expenditures in Item 7. MD&A—Capital Requirements.

The New Jersey Air Pollution Control Act requires that certain sources of air emissions obtain operating permits issued by the New Jersey Department of Environmental Protection (NJDEP). All of our generating facilities in New Jersey are required to have such operating permits. Our generating facilities in New York, Connecticut, Pennsylvania and Texas are under jurisdiction of their respective state’s environmental agencies. The costs of compliance associated with any new requirements that may be imposed by these permits in the future are not known at this time and are not included in capital expenditures, but may be material.

|  |  |
| --- | --- |
| • | SO2, NOx and Particulate Matter Emissions—Since January 1, 2000 the Clean Air Act set a cap on SO2 emissions from affected units and allocates SO2 allowances to those units with the stated intent of reducing the impact of acid rain. Generation units with emissions greater than their allocations can obtain allowances from sources that have excess allowances. We do not expect to incur material expenditures to continue complying with the acid rain program. |
|  | The U.S. Environmental Protection Agency (EPA) published the final Clean Air Interstate Rule (CAIR) that identified 28 states and the District of Columbia as contributing significantly to the levels of fine particulates and/or eight-hour ozone air quality in downwind states. New Jersey, New York, Pennsylvania, Texas and Connecticut were among the states the EPA listed in the CAIR. Based on state obligations to address interstate transport of pollutants under the Clean Air Act, the EPA had proposed a two-phased emission reduction program with Phase 1 beginning in 2009 for NOx and 2010 for SO2 and Phase 2 beginning in 2015. The EPA is recommending that the program be implemented through a cap-and-trade program, although states are not required to proceed in this manner. |
|  | In December 2008, the U.S. Court of Appeals for the District of Columbia Circuit remanded CAIR back to the EPA to fix the flaws within CAIR. CAIR will remain in effect until the EPA issues new rules. |

26

The remand allows the NOx trading program in CAIR to commence in 2009, with the annual NOx cap-and-trade program starting on January 1, 2009 (NJ, NY, PA, TX), and the Ozone season NOx cap-and-trade program starting May 1, 2009 (NJ, NY, CT, PA) in a separate and distinct cap- and-trade program. It is anticipated that, in aggregate, we will be net buyers of annual NOx allowances but will likely be allocated sufficient allowances to satisfy Ozone season NOx emissions. At recent market prices of annual NOx allowances, the cost of our estimated shortfall requirement of 3,000 allowances is approximately $10 million for 2009. The future direction of the market is unclear due to the recent court ruling and pending new administration leadership. The final cost of compliance is uncertain due to market instability.

If the SO2 part of CAIR is initiated on January 1, 2010, the financial impact to us is anticipated to be minimal due to the surplus allowances banked from the acid rain program that can be used to satisfy CAIR obligations.

### Water Pollution Control

The Federal Water Pollution Control Act (FWPCA) prohibits the discharge of pollutants to waters of the U.S. from point sources, except pursuant to a National Pollutant Discharge Elimination System (NPDES) permit issued by the EPA or by a state under a federally authorized state program. The FWPCA authorizes the imposition of technology-based and water quality-based effluent limits to regulate the discharge of pollutants into surface waters and ground waters. The EPA has delegated authority to a number of state agencies, including those in New Jersey, New York, Connecticut and Texas, to administer the NPDES program through state acts. We also have ownership interests in facilities in other jurisdictions that have their own laws and implement regulations to control discharges to their surface waters and ground waters that directly govern our facilities in those jurisdictions.

The EPA promulgated regulations under FWPCA Section 316(b), which require that cooling water intake structures reflect the best technology available (BTA) for minimizing adverse environmental impact. The Phase II rule covering large existing power plants became effective in 2004. The Phase II regulations provided five alternative methods by which a facility can demonstrate that it complies with the requirement for best technology available for minimizing adverse environmental impacts associated with cooling water intake structures.

In January 2007, the U.S. Court of Appeals for the Second Circuit issued a decision that remanded major portions of the regulations and determined that Section 316(b) of the Clean Water Act does not support the use of restoration and the site-specific cost-benefit test. The court instructed the EPA to reconsider the definition of best technology available without comparing the costs of the best performing technology to its benefits. Prior to this decision, we had used restoration and/or a site-specific cost-benefit test in applications we had filed to renew the permits at our once-through cooled plants, including Salem, Hudson and Mercer. Although the rule applies to all of our electric generating units that use surface waters for once-through cooling purposes, the impact of the rule and the decision of the court cannot be determined at this time.

The U.S. Supreme Court granted the request of industry petitioners, including us, to review the question of whether Section 316(b) of the FWPCA allows the EPA to compare costs with benefits in determining the “best technology available” for minimizing adverse environmental impact at cooling water intake structures. It is anticipated that the U.S. Supreme Court will render a decision before the end of its 2008-2009 term.

The decision could have a material impact on our ability to renew NPDES permits at our larger once-through cooled plants, including Salem, Hudson, Mercer, Bridgeport and possibly Sewaren and New Haven, without making significant upgrades to our existing intake structures and cooling systems. The costs of those upgrades to one or more of our once-through cooled plants could be material and would require economic review to determine whether to continue operations.

### Hazardous Substance Liability

Because of the nature of our businesses, including the production and delivery of electricity, the distribution of gas and, formerly, the manufacture of gas, various by-products and substances are or were produced or handled that contain constituents classified by federal and state authorities as hazardous. Federal and state laws impose liability for damages to the environment from hazardous substances. This liability can include obligations to conduct an environmental remediation of discharged hazardous substances as well as monetary payments, regardless of the absence of fault and the absence of any prohibitions against the activity when it occurred, as compensation for injuries to natural resources.

- ***Site Remediation—***The Federal Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA) and the New Jersey Spill Compensation and Control Act (Spill Act) require the remediation of discharged hazardous substances and authorize the EPA, the NJDEP and private parties to commence lawsuits to compel clean-ups or reimbursement for clean-ups of discharged hazardous substances. The clean-ups of hazardous substances can be more complicated and the costs higher when the hazardous substances are in a body of water.
- ***Natural Resource Damages—***CERCLA and the Spill Act authorize federal and state trustees for natural resources to assess damages against persons who have discharged a hazardous substance, causing an injury to natural resources. Pursuant to the Spill Act, the NJDEP requires persons conducting remediation to characterize injuries to natural resources and to address those injuries through restoration or damages. The NJDEP adopted regulations concerning site investigation and remediation that require an ecological evaluation of potential damages to natural resources in connection with an environmental investigation of contaminated sites. The NJDEP also issued guidance to assist parties in calculating their natural resource damage liability for settlement purposes, but has stated that those calculations are applicable only for those parties that volunteer to settle a claim for natural resource damages before a claim is asserted by the NJDEP. We are currently unable to assess the magnitude of the potential financial impact of this regulatory change.

### Fuel and Waste Disposal

|  |  |
| --- | --- |
| • | Nuclear Fuel Disposal—The federal government has entered into contracts with the operators of nuclear power plants for transportation and ultimate disposal of spent nuclear fuel. To pay for this service, nuclear plant owners are required to contribute to a Nuclear Waste Fund. The DOE has announced that it does not expect a facility for such purpose to be available earlier than 2017. |
|  | Spent nuclear fuel generated in any reactor can be stored in reactor facility storage pools or in Independent Spent Fuel Storage Installations located at reactors or away-from reactor sites for at least 30 years beyond the licensed life for the reactor. We have an on-site storage facility that is expected to satisfy Salem 1’s, Salem 2’s and Hope Creek’s storage needs through the end of their current licenses as well as storage needs over the units’ anticipated 20 year license extensions. Exelon Generation has advised us that it has an on-site storage facility that will satisfy Peach Bottom’s storage requirements until at least 2014. |
| • | Low Level Radioactive Waste—As a by-product of their operations, nuclear generation units produce low level radioactive waste. Such waste includes paper, plastics, protective clothing, water purification materials and other materials. These waste materials are accumulated on site and disposed of at licensed permanent disposal facilities. New Jersey, Connecticut and South Carolina have formed the Atlantic Compact, which gives New Jersey nuclear generators continued access to the Barnwell waste disposal facility which is owned by South Carolina. We believe that the Atlantic Compact will provide for adequate low level radioactive waste disposal for Salem and Hope Creek through the end of their current licenses including full decommissioning, although no assurances can be given. There are on-site storage facilities for Salem, Hope Creek and Peach Bottom, which we believe have the capacity for at least five years of temporary storage for each facility. |

### Climate Change

In response to global climate change, many states, primarily in the Northeastern U.S., have developed state-specific and regional legislative initiatives to stimulate national climate legislation through CO2 emission reductions in the electric power industry. Ten Northeastern states, including New Jersey, New York and Connecticut, have signed a memorandum of understanding establishing the RGGI intended to cap and reduce

CO2 emissions in the region. A model rule to reflect the memorandum of understanding was established and, in general, states adopted the elements of the model rule into state-specific rules to enable the RGGI regulatory mandate in each state.

States’ rules require the creation of a CO2 allowance allocation and/or auction whereby generators would be expected to receive through allocation, or purchase through an auction, CO2 allowances corresponding to each facility’s emissions. The first two CO2 emissions allowance auctions under RGGI were held in September and December 2008, resulting in prices of $3.07 and $3.38 per allowance, respectively. We anticipate that our 2009 generation would require purchases of approximately 16 million allowances at a total estimated cost of approximately $60 million at recent market prices.

New Jersey adopted the Global Warming Response Act in 2007, which calls for stabilizing its greenhouse gas emissions to 1990 levels by 2020, followed by a further reduction of greenhouse emissions to 80% below 2006 levels by 2050. To reach this goal, the NJDEP, the BPU, other state agencies and stakeholders are required to evaluate methods to meet and exceed the emission reduction targets, taking into account their economic benefits and costs.

In January 2008, additional legislation was enacted authorizing the NJDEP to sell, exchange, retire, assign, allocate or auction allowances from greenhouse gas emission reductions and set forth the procedural requirements to be followed by the NJDEP if allowances are auctioned. Auction proceeds would be used to provide grants and other forms of assistance for the purpose of energy efficiency, renewable energy and new high efficiency generation to stimulate or reward investment in the development of innovative CO2 reduction or avoidance technologies and stewardship of New Jersey’s forests and tidal marshes. The BPU allows an electric or gas public utility to offer programs for energy efficiency, conservation and Class I renewables and to recover associated costs, as well as a return on investment, in rates. The law further provides that the BPU shall adopt an emissions portfolio standard or other regulatory mechanism, to mitigate “leakage” by July 1, 2009, unless New Jersey’s Attorney General determines that this will unconstitutionally burden interstate commerce or would be preempted by federal law.

Absent the implementation of any mitigation mechanisms, the operations of plants within the RGGI region are likely to be reduced since the added costs to reduce CO2 emissions would increase operating costs making the less expensive facilities outside the RGGI region more likely to be dispatched.

On January 29, 2009, an owner of an electric generating unit in New York filed a complaint in New York state court challenging the legality of New York’s implementation of RGGI under both State and Federal law. The outcome of this litigation cannot be predicted, but could impact the continued implementation of RGGI in New York and potentially the RGGI region.

The new legislation also authorizes the BPU to require the disclosure on customer bills of the environmental characteristics of the delivered energy, to develop an interim renewable energy portfolio standard, a requirement for net metering and electric and gas energy efficiency portfolio standards.

A federal program that would impose uniform requirements on all sources of greenhouse gas emissions has not been implemented, thereby allowing for state and regional programs that may establish requirements that impose different costs in the markets where we compete.

In 2007, the U.S. Supreme Court issued a decision stating that the EPA has authority to regulate greenhouse gas emissions from new motor vehicles as air pollutants. This decision could have a future impact on us if the Supreme Court’s opinion or the section of the Clean Air Act relied upon by the Supreme Court in its decision is found to be supportive of regulating CO2 from other sources, including generation units, and it was applied by the EPA to existing regulatory programs under the Clean Air Act applicable to air emissions from our facilities.

The outcome of global climate change initiatives cannot be determined; however, adoption of stringent CO2 emissions reduction requirements in the Northeast, including the potential allocation of allowances to our facilities and the prices of allowances available through auction, could materially impact our operations. The financial impact of a requirement to purchase allowances for emissions of CO2 would be greatest on coal- fired generating units because they typically have the highest CO2 emission rate and thereby the need to purchase the most allowances. Gas-fired units would require fewer allowances and nuclear units would not need any allowances. Further, any addition of CO2 limit requirements under a national program, either through existing authority under the Clean Air Act, or under other legislative authority, could impose an additional financial impact on our fossil generation activities beyond that imposed by state and regional programs, such as RGGI. It is premature to determine the positive or negative financial impact of a future federal climate change program because it is difficult to determine the effect of such program on the dispatch of our electric generation units compared to the dispatch of other power generating companies, particularly those which may have a larger carbon footprint.

### SEGMENT INFORMATION

Financial information with respect to our business segments is set forth in Note 20. Financial Information by Business Segment.

## Risk factors

As filed, 32,957 characters.

The following factors should be considered when reviewing our businesses. These factors could have an adverse impact on our financial position, results of operations or net cash flows and could cause results to differ materially from those expressed elsewhere in this document.

The factors discussed in Item 7. MD&A may also adversely affect our results of operations and cash flows and affect the market prices for our publicly traded securities. While we believe that we have identified and discussed the key risk factors affecting our business, there may be additional risks and uncertainties that are not presently known or that are not currently believed to be significant.

**We are subject to comprehensive regulation by federal, state and local regulatory agencies that affects, or may affect, our business.**

We are subject to regulation by federal, state and local authorities. Changes in regulation can cause significant delays in or materially affect business planning and transactions and can materially increase our costs. Regulation affects almost every aspect of our businesses, such as our ability to:

|  |  |
| --- | --- |
| • | Obtain fair and timely rate relief—Our utility’s base rates for electric and gas distribution are subject to regulation by the BPU and are effective until a new base rate case is filed and concluded. In addition, limited categories of costs such as fuel are recovered through adjustment clauses that are periodically reset to reflect current costs. Our transmission assets are regulated by the FERC and costs are recovered through rates set by the FERC. Inability to obtain a fair return on our investments or to recover material costs not included in rates would have a material adverse effect on our business. |
| • | Obtain required regulatory approvals—The majority of our businesses operate under MBR authority granted by FERC. FERC has determined that our subsidiaries do not have market power and MBR rules have been satisfied. Failure to maintain MBR eligibility, or the effects of any severe mitigation measures that may be required if market power was re-evaluated in the future, could have a material adverse effect on us. |
|  | We may also require various other regulatory approvals to, among other things, buy or sell assets, engage in transactions between our public utility and our other subsidiaries, and, in some cases, enter into financing arrangements, issue securities and allow our subsidiaries to pay dividends. Failure to obtain these approvals could materially adversely affect our results of operations and cash flows. |
| • | Comply with regulatory requirements—There are standards in place to ensure the reliability of the U. S. electric transmission and generation system and to prevent major system black-outs. These standards apply to all transmission owners and generation owners and operators. We are periodically audited for compliance. FERC can impose penalties up to $1 million per day per violation. In |

30 addition, the FERC requires compliance with all of its rules and orders, including rules concerning Standards of Conduct, market behavior and anti-manipulation rules, interlocking directorate rules and cross-subsidization.

The BPU conducts periodic combined management/competitive service audits of New Jersey utilities related to affiliate standard requirements, competitive services, cross-subsidization, cost allocation and other issues. We expect to be subject to management audits in 2009 and, while we believe that we are in compliance, we cannot predict the outcome of any audit.

There are two pending issues at the BPU stemming from the restructuring of the utility industry in New Jersey several years ago.

|  |  |
| --- | --- |
| • | Treatment of previously approved stranded costs—Our utility securitized $2.525 billion of generation and generation-related costs pursuant to an irrevocable, non-bypassable BPU financing order. The authority of the BPU to issue its order was upheld by the New Jersey Supreme Court in 2001. An action seeking injunctive relief from our continued collection of the related charges, as well as recovery of amounts previously charged and collected, was filed in 2007 in the New Jersey Supreme Court. This action was summarily dismissed by that Court, and affirmed on appeal in February 2009. For additional information, see Legal Proceedings. We cannot predict the outcome of the court proceeding or of a related action pending at the BPU. |
| • | Market Transition Charge (MTC) collected during the four-year industry transition period—The BPU has raised certain questions with respect to the reconciliation method we employed in calculating the over-recovery of MTC and other charges during the four-year transition period from 1999 to 2003. The amount in dispute was $114 million, which if required to be refunded to customers with interest through December 2008, would be $140 million. In January 2009, the Administrative Law Judge (ALJ) issued a decision which upheld our central contention that the 2004 BPU order approving the Phase I settlement resolved the issues now raised by the Staff and Advocate, and that these issues should not be subject to re-litigation in respect of the first three years of the transition period. The ALJ’s decision states that the BPU could elect to convene a separate proceeding to address the fourth and final year reconciliation of MTC recoveries. The amount in dispute with respect to this Phase II period is approximately $50 million. |
|  | Exceptions to the ALJ’s decision have been filed by the parties. The BPU may choose to accept, modify or reject the ALJ’s decision in reaching its final decision in the case. We do not expect a final BPU order before March 2009 and cannot predict the outcome of this proceeding. |

**Certain of our leveraged lease transactions may be successfully challenged by the IRS, which would have a material adverse effect on our taxes, operating results and cash flows.**

We have received Revenue Agent’s Reports from the IRS with respect to its audit of our federal corporate income tax returns for tax years 1997 through 2003, which disallowed all deductions associated with certain leveraged lease transactions. In addition, the IRS Reports proposed a 20% penalty for substantial understatement of tax liability.

As of December 31, 2008, $1.2 billion would become currently payable if we conceded all of the deductions taken through that date. We deposited a total of $180 million to defray potential interest costs associated with this disputed tax liability and may make additional deposits in 2009. As of December 31, 2008, penalties of $151 million could also become payable if the IRS is successful in its claims. If the IRS is successful in a litigated case consistent with the positions it has taken in a generic settlement offer recently proposed to us, an additional $130 million to $150 million of tax would be due for tax positions through December 31, 2008.

**We are subject to numerous federal and state environmental laws and regulations that may significantly limit or affect our business, adversely impact our business plans or expose us to significant environmental fines and liabilities.**

We are subject to extensive environmental regulation by federal, state and local authorities regarding air quality, water quality, site remediation, land use, waste disposal, aesthetics, impact on global climate, natural resources damages and other matters. These laws and regulations affect the manner in which we conduct our operations and make capital expenditures. Future changes may result in increased compliance costs.

Delay in obtaining, or failure to obtain and maintain any environmental permits or approvals, or delay or failure to satisfy any applicable environmental regulatory requirements, could:

- prevent construction of new facilities,
- prevent continued operation of existing facilities,
- prevent the sale of energy from these facilities, or
- result in significant additional costs which could materially affect our business, results of operations and cash flows.

In obtaining required approvals and maintaining compliance with laws and regulations, we focus on several key environmental issues, including:

|  |  |
| --- | --- |
| • | Concerns over global climate change could result in laws and regulations to limit CO2 emissions or other “greenhouse” gases produced by our fossil generation facilities—Federal and state legislation and regulation designed to address global climate change through the reduction of greenhouse gas emissions could materially impact our fossil generation facilities. Recent legislation enacted in New Jersey establishes aggressive goals for the reduction of CO2 emissions over a 40-year period. There could be material modifications at a significant cost required for continued operation of our fossil generation facilities, including the potential need to purchase CO2 emission allowances. Such expenditures could materially affect the continued economic viability of one or more such facilities. Multiple states, primarily in the Northeastern U.S., are developing or have developed state-specific or regional legislative initiatives to stimulate CO2 emissions reductions in the electric power industry. The RGGI began in 2009. Member states will control emissions of greenhouse gases by issuance of allowances to emit CO2 through an auction, allocation or a combination of the two methods. |
|  | A significant portion of our fossil fuel-fired electric generation is located in states within the RGGI region and compete with electricity generators within PJM not located within a RGGI state. The costs or inability to purchase CO2 allowances for our fleet operating within a RGGI state could place us at an economic disadvantage compared to our competitors not located in a RGGI state. |
| • | Potential closed-cycle cooling requirements—Our Salem nuclear generating facility has a permit from the NJDEP allowing for its continued operation with its existing cooling water system. That permit expired in July 2006. Our application to renew the permit, filed in February 2006, estimated the costs associated with cooling towers for Salem to be approximately $1 billion, of which our share was approximately $575 million. |
|  | If the NJDEP and the Connecticut Department of Environmental Protection were to require installation of closed-cycle cooling or its equivalent at our Mercer, Hudson, Bridgeport, Sewaren or New Haven generating stations, the related increased costs and impacts would be material to our financial position, results of operations and net cash flows and would require further economic review to determine whether to continue operations or decommission the stations. |
| • | Remediation of environmental contamination at current or formerly owned facilities—We are subject to liability under environmental laws for the costs of remediating environmental contamination of property now or formerly owned by us and of property contaminated by hazardous substances that we generated. Remediation activities associated with our former Manufactured Gas |

32

|  |  |
| --- | --- |
|  | Plant (MGP) operations are one source of such costs. Also, we are currently involved in a number of proceedings relating to sites where other hazardous substances may have been deposited and may be subject to additional proceedings in the future, the related costs of which could have a material adverse effect on our financial condition, results of operations and cash flows. |
|  | In June 2007, the State of New Jersey filed multiple lawsuits against parties, including us, who were alleged to be responsible for injuries to natural resources in New Jersey, including a site being remediated under our MGP program. We cannot predict what further actions, if any, or the costs or the timing thereof, that may be required with respect to these or other natural resource damages claims. For additional information, see Note 11. Commitments and Contingent Liabilities. |
|  | More stringent air pollution control requirements in New Jersey—Most of our generating facilities are located in New Jersey where restrictions are generally considered to be more stringent in comparison to other states. Therefore, there may be instances where the facilities located in New Jersey are subject to more restrictive and, therefore, more costly pollution control requirements and liability for damage to natural resources, than competing facilities in other states. Most of New Jersey has been classified as “nonattainment” with national ambient air quality standards for one or more air contaminants. This requires New Jersey to develop programs to reduce air emissions. Such programs can impose additional costs on us by requiring that we offset any emissions increases from new electric generators we may want to build and by setting more stringent emission limits on our facilities that run during the hottest days of the year. |
| • | Coal Ash Management—A by-product of the combustion of coal is coal ash. Two types of coal ash are produced at our Hudson, Mercer and Bridgeport stations: bottom ash and fly ash. We currently have a program in which we beneficially re-use ash in other processes to avoid disposal. Coal ash is not currently regulated as a hazardous waste under federal and state law. Any future regulation of coal ash could result in additional costs which could be material. |

**Our ownership and operation of nuclear power plants involve regulatory, financial, environmental, health and safety risks.**

Over half of our total generation output each year is provided by our nuclear fleet, which comprises approximately one-fourth of our total owned generation capacity. For this reason, we are exposed to risks related to the continued successful operation of our nuclear facilities and issues that may adversely affect the nuclear generation industry. These include:

|  |  |
| --- | --- |
| • | Storage and Disposal of Spent Nuclear Fuel—We currently use on-site storage for spent nuclear fuel and incur costs to maintain this storage. Potential increased costs of storage, handling and disposal of nuclear materials, including the availability or unavailability of a permanent repository for spent nuclear fuel, could impact future operations of these stations. In addition, the availability of an off-site repository for spent nuclear fuel may affect our ability to fully decommission our nuclear units in the future. |
| • | Regulatory and Legal Risk—The NRC may modify, suspend or revoke licenses, or shut down a nuclear facility and impose substantial civil penalties for failure to comply with the Atomic Energy Act, related regulations or the terms and conditions of the licenses for nuclear generating facilities. As with all of our generation facilities, as discussed above, our nuclear facilities are also subject to comprehensive, evolving environmental regulation. |
|  | Our nuclear generating facilities are currently operating under NRC licenses that expire in 2016, 2020, 2026, 2033 and 2034.While we have applied for extensions to these licenses for Peach Bottom II and III and expect to apply for extensions for Salem and Hope Creek, the extension process can be expected to take three to five years from commencement until completion of NRC review. We cannot be sure that we will receive the requested extensions or be able to operate the facilities for all or any portion of any extended license. |

33

- ***Operational Risk—***Operations at any of our nuclear generating units could degrade to the point where the affected unit needs to be shut down or operated at less than full capacity. If this were to happen, identifying and correcting the causes may require significant time and expense. Since our nuclear fleet provides the majority of our generation output, any significant outage could result in reduced earnings as we would need to purchase or generate higher-priced energy to meet our contractual obligations. For additional information, see our discussion of operational performance for all of our generation facilities below.
- ***Nuclear Incident or Accident Risk—***Accidents and other unforeseen problems have occurred at nuclear stations both in the U.S. and elsewhere. The consequences of an accident can be severe and may include loss of life and property damage. All our nuclear units are located at one of two sites. It is possible that an accident or other incident at a nuclear generating unit could adversely affect our ability to continue to operate unaffected units located at the same site, which would further affect our financial condition, operating results and cash flows. An accident or incident at a nuclear unit not owned by us could also affect our ability to operate our units. Any resulting financial impact from a nuclear accident may exceed our resources, including insurance coverages.

**We may be adversely affected by changes in energy deregulation policies, including market design rules and developments affecting transmission.**

The energy industry continues to experience significant change. Various rules have recently been implemented to respond to commodity pricing, reliability and other industry concerns. Our business has been impacted by established rules that create locational capacity markets in each of PJM, New England and New York. Under these rules, generators located in constrained areas are paid more for their capacity so there is an incentive to locate in those areas where generation capacity is most needed. Because much of our generation is located in constrained areas in PJM and New England, the existence of these rules has had a positive impact on our revenues. PJM’s locational capacity market design rules are currently being challenged in court, and FERC is currently considering changes to PJM’s rules for RPM. Any changes to these rules may have an adverse impact on our financial condition, results of operations and cash flows.

Many factors will affect the capacity pricing in PJM, including but not limited to:

- changes in load and demand,
- changes in the available amounts of demand response resources,
- changes in available generating capacity (including retirements, additions, derates, forced outage rates, etc.,
- increases in transmission capability between zones, and
- changes to the pricing mechanism, including increasing the potential number of zones to create more pricing sensitivity to changes in supply and demand, as well as other potential changes that PJM may propose over time.

We could also be impacted by a number of other events, including regulatory or legislative actions favoring non-competitive markets and energy efficiency initiatives. Further, some of the market-based mechanisms in which we participate, including BGS auctions, are at times the subject of review or discussion by some of the participants in the New Jersey and federal regulatory and political. We can provide no assurance that these mechanisms will continue to exist in their current form or not otherwise be modified by regulations.

To the extent that additions to the transmission system relieve or reduce congestion in eastern PJM where most of our plants are located, our revenues could be adversely affected. In addition, pressures from renewable resources such as wind and solar, could increase over time, especially if government incentive programs continue to grow.

### We face competition in the merchant energy markets.

Our wholesale power and marketing businesses are subject to competition that may adversely affect our ability to make investments or sales on favorable terms and achieve our annual objectives. Increased competition could contribute to a reduction in prices offered for power and could result in lower returns. Decreased competition could negatively impact results through a decline in market liquidity. Some of the competitors include:

- merchant generators,
- domestic and multi-national utility generators,
- energy marketers,
- banks, funds and other financial entities,
- fuel supply companies, and
- affiliates of other industrial companies.

Regulatory, environmental, industry and other operational issues will have a significant impact on our ability to compete in energy markets. Our ability to compete will also be impacted by:

- ***DSM and other efficiency efforts—***DSM and other efficiency efforts aimed at changing the quantity and patterns of consumers’ usage could result in a reduction in load requirements.
- ***Changes in technology and/or customer conservation—***It is possible that advances in technology will reduce the cost of alternative methods of producing electricity, such as fuel cells, microturbines, windmills and photovoltaic (solar) cells, to a level that is competitive with that of most central station electric production. It is also possible that electric customers may significantly decrease their electric consumption due to demand-side energy conservation programs. Changes in technology could also alter the channels through which retail electric customers buy electricity, which could adversely affect financial results.

If any of such issues was to occur, there could be a resultant erosion of our market share and an impairment in the value of our power plants.

**We are exposed to commodity price volatility as a result of our participation in the wholesale energy markets.**

The material risks associated with the wholesale energy markets known or currently anticipated that could adversely affect our operations include:

- ***Price fluctuations and collateral requirements—***We expect to meet our supply obligations through a combination of generation and energy purchases. We also enter into derivative and other positions related to our generation assets and supply obligations. To the extent we hedge our costs, we will be subject to the risk of price fluctuations that could affect our future results and impact our liquidity needs. These include:

variability in costs, such as changes in the expected price of energy and capacity that we sell into the market;

increases in the price of energy purchased to meet supply obligations or the amount of excess energy sold into the market;

the cost of fuel to generate electricity; and

the cost of emission credits and congestion credits that we use to transmit electricity.

As market prices for energy and fuel fluctuate, our forward energy sale and forward fuel purchase contracts could require us to post substantial additional collateral, thus requiring us to obtain additional sources of liquidity during periods when our ability to do so may be limited. If Power were to lose its investment grade credit rating, it would be required under certain agreements to provide a significant amount of additional collateral in the form of letters of credit or cash, which would have a material adverse effect on our liquidity and cash flows. If Power had lost its investment grade credit rating as of December 31, 2008, it would have been required to provide approximately $1.1 billion in additional collateral.

- ***Our cost of coal and nuclear fuel may substantially increase—***Our coal and nuclear units have a diversified portfolio of contracts and inventory that will provide a substantial portion of our fuel needs over the next several years. However, it will be necessary to enter into additional arrangements to acquire coal and nuclear fuel in the future. Market prices for coal and nuclear fuel have recently been volatile. Although our fuel contract portfolio provides a degree of hedging against these market risks, future increases in fuel costs cannot be predicted with certainty and could materially and adversely affect liquidity, financial condition and results of operations.
- ***Third party credit risk—***We sell generation output and buy fuel through the execution of bilateral contracts. These contracts are subject to credit risk, which relates to the ability of our counterparties to meet their contractual obligations to us. Any failure to perform by these counterparties could have a material adverse impact on our results of operations, cash flows and financial position. In the spot markets, we are exposed to the risks of whatever default mechanisms exist in those markets, some of which attempt to spread the risk across all participants, which may not be an effective way of lessening the severity of the risk and the amounts at stake. An increase in the duration and/or severity of the current economic recession may also increase such risk.

**Our inability to balance energy obligations with available supply could negatively impact results.**

The revenues generated by the operation of the generating stations are subject to market risks that are beyond our control. Generation output will either be used to satisfy wholesale contract requirements, other bilateral contracts or be sold into competitive power markets. Participants in the competitive power markets are not guaranteed any specified rate of return on their capital investments. Generation revenues and results of operations are dependent upon prevailing market prices for energy, capacity, ancillary services and fuel supply in the markets served.

Our business frequently involves the establishment of forward sale positions in the wholesale energy markets on long-term and short-term bases. To the extent that we have produced or purchased energy in excess of our contracted obligations, a reduction in market prices could reduce profitability. Conversely, to the extent that we have contracted obligations in excess of energy we have produced or purchased, an increase in market prices could reduce profitability.

If the strategy we utilize to hedge our exposures to these various risks is not effective, we could incur significant losses. Our market positions can also be adversely affected by the level of volatility in the energy markets that, in turn, depends on various factors, including weather in various geographical areas, short-term supply and demand imbalances and pricing differentials at various geographic locations. These cannot be predicted with any certainty.

Increases in market prices also affect our ability to hedge generation output and fuel requirements as the obligation to post margin increases with increasing prices and could require the maintenance of liquidity resources that would be prohibitively expensive.

**If we are unable to access sufficient capital at reasonable rates or maintain sufficient liquidity in the amounts and at the times needed, our ability to successfully implement our financial strategies may be adversely affected.**

Capital for projects and investments has been provided by internally-generated cash flow, equity issuances and borrowings. Continued access to debt capital from outside sources is required in order to efficiently fund the cash flow needs of our businesses. The ability to arrange financing and the costs of capital depend on numerous factors including, among other things, general economic and market conditions, the availability of credit from banks and other financial institutions, investor confidence, the success of current projects and the quality of new projects.

The ability to have continued access to the credit and capital markets at a reasonable economic cost is dependent upon our current and future capital structure, financial performance, our credit ratings and the availability of capital under reasonable terms and conditions. As a result, no assurance can be given that we will be successful in obtaining re-financing for maturing debt, financing for projects and investments or funding the equity commitments required for such projects and investments in the future.

**Capital market performance directly affects the asset values of our nuclear decommissioning trust funds and defined benefit plan trust funds. Sustained decreases in asset value of trust assets could result in the need for significant additional funding.**

The performance of the capital markets will affect the value of the assets that are held in trust to satisfy our future obligations under our pension and postretirement benefit plans and to decommission our nuclear generating plants. The decline in the market value of our pension assets experienced in the fourth quarter of 2008 has resulted in the need to make additional contributions in 2009 to maintain our funding at sufficient levels. Further significant declines in the market value of these assets may significantly increase our funding requirements for these obligations in the future.

**An extended economic recession would likely have a material adverse effect on our businesses.**

Our results of operations may be negatively affected by sustained downturns or sluggishness in the economy, including low levels in the market prices of commodities. Adverse conditions in the economy affect the markets in which we operate and can negatively impact our results. Declines in demand for energy will reduce overall sales and lessen cash flows, especially as customers reduce their consumption of electricity and gas. Although our utility business is subject to regulated allowable rates of return, overall declines in electricity and gas sold and/or increases in non-payment of customer bills would materially adversely affect our liquidity, financial condition and results of operations.

**In the event of an accident or acts of war or terrorism, our insurance coverage may be insufficient if we are unable to obtain adequate coverage at commercially reasonable rates.**

We have insurance for all-risk property damage including boiler and machinery coverage for our nuclear and non-nuclear generating units, replacement power and business interruption coverage for our nuclear generating units, general public liability and nuclear liability, in amounts and with deductibles that we consider appropriate.

We can give no assurance that this insurance coverage will be available in the future on commercially reasonable terms or that the insurance proceeds received for any loss of or any damage to any of our facilities will be sufficient.

**Inability to successfully develop or construct generation, transmission and distribution projects within budget could adversely impact our businesses.**

Our business plan calls for extensive investment in capital improvements and additions, including the installation of required environmental upgrades and retrofits, construction and/or acquisition of additional generation units and transmission facilities and modernizing existing infrastructure. Currently, we have several significant projects underway or being contemplated, including:

- the installation of pollution control equipment at our coal generating facilities;
- the construction of the new Susquehanna-Roseland transmission line;
- the investment in improving the electric and gas distribution infrastructure;
- the implementation of a new customer service system; and
- the solar initiative in New Jersey.

Our success will depend, in part, on our ability to complete these projects within budgets, on commercially reasonable terms and conditions and, in our regulated businesses, our ability to recover the related costs. Any delays, cost escalations or otherwise unsuccessful construction and development could materially affect our financial position, results of operations and cash flows.

**We may be unable to achieve, or continue to sustain, our expected levels of generating operating performance.**

One of the key elements to achieving the results in our business plans is the ability to sustain generating operating performance and capacity factors at expected levels. This is especially important at our lower-cost nuclear and coal facilities. Operations at any of our plants could degrade to the point where the plant has to shut down or operate at less than full capacity. Some issues that could impact the operation of our facilities are:

- breakdown or failure of equipment, processes or management effectiveness;
- disruptions in the transmission of electricity;
- labor disputes;
- fuel supply interruptions;
- transportation constraints;
- limitations which may be imposed by environmental or other regulatory requirements;
- permit limitations; and
- operator error or catastrophic events such as fires, earthquakes, explosions, floods, acts of terrorism or other similar occurrences.

Identifying and correcting any of these issues may require significant time and expense. Depending on the materiality of the issue, we may choose to close a plant rather than incur the expense of restarting it or returning it to full capacity. In either event, to the extent that our operational targets are not met, we could have to operate higher-cost generation facilities or meet our obligations through higher-cost open market purchases.

## Properties

As filed, 8,966 characters.

All of our physical property is owned by our subsidiaries. We believe that we and our subsidiaries maintain adequate insurance coverage against loss or damage to plants and properties, subject to certain exceptions, to the extent such property is usually insured and insurance is available at a reasonable cost.

### Generation Facilities

As of December 31, 2008, Power’s share of summer installed generating capacity was 13,576 MW, as shown in the following table:

| Name Steam: | Location | Total Capacity (MW) | % Owned | Owned Capacity (MW) | Principal Fuels Used | Mission |
| --- | --- | ---: | ---: | ---: | --- | --- |
| Hudson | NJ | 923 | 100% | 923 | Coal/Gas | Load Following |
| Mercer | NJ | 636 | 100% | 636 | Coal | Load Following |
| Sewaren | NJ | 453 | 100% | 453 | Gas | Load Following |
| Keystone(A) | PA | 1,712 | 23% | 391 | Coal | Base Load |
| Conemaugh(A) | PA | 1,711 | 23% | 385 | Coal | Base Load |
| Bridgeport Harbor | CT | 514 | 100% | 514 | Coal/Oil | Base Load/Load Following |
| New Haven Harbor | CT | 448 | 100% | 448 | Oil | Load Following |
| **Total Steam** |  | **6,397** |  | **3,750** |  |  |
| **Nuclear:** |  |  |  |  |  |  |
| Hope Creek | NJ | 1,211 | 100% | 1,211 | Nuclear | Base Load |
| Salem 1 & 2 | NJ | 2,345 | 57% | 1,346 | Nuclear | Base Load |
| Peach Bottom 2 & 3(B) | PA | 2,224 | 50% | 1,112 | Nuclear | Base Load |
| **Total Nuclear** |  | **5,780** |  | **3,669** |  |  |
| **Combined Cycle:** |  |  |  |  |  |  |
| Bergen | NJ | 1,225 | 100% | 1,225 | Gas | Load Following |
| Linden | NJ | 1,230 | 100% | 1,230 | Gas | Load Following |
| Bethlehem | NY | 747 | 100% | 747 | Gas | Load Following |
| **Total Combined Cycle** |  | **3,202** |  | **3,202** |  |  |
| **Combustion Turbine:** |  |  |  |  |  |  |
| Essex | NJ | 617 | 100% | 617 | Gas | Peaking |
| Edison | NJ | 504 | 100% | 504 | Gas | Peaking |
| Kearny | NJ | 446 | 100% | 446 | Gas | Peaking |
| Burlington | NJ | 553 | 100% | 553 | Oil | Peaking |
| Linden | NJ | 336 | 100% | 336 | Gas | Peaking |
| Mercer | NJ | 115 | 100% | 115 | Oil | Peaking |
| Sewaren | NJ | 105 | 100% | 105 | Oil | Peaking |
| Bergen. | NJ | 21 | 100% | 21 | Gas | Peaking |
| National Park | NJ | 21 | 100% | 21 | Oil | Peaking |
| Salem | NJ | 38 | 57% | 22 | Oil | Peaking |
| Bridgeport Harbor | CT | 15 | 100% | 15 | Oil | Peaking |
| **Total Combustion Turbine** |  | **2,771** |  | **2,755** |  |  |
| **Pumped Storage:** |  |  |  |  |  |  |
| Yards Creek(C) | NJ | 400 | 50% | 200 |  | Peaking |
| **Total Operating Generation Plants** |  | **18,550** |  | **13,576** |  |  |

(A) Operated by Reliant Energy.

(B) Operated by Exelon Generation.

(C) Operated by JCP&L.

39

Energy Holdings has investments in the following generation facilities as of December 31, 2008:

| Name United States PSEG Texas | Location | Total Capacity (MW) | % Owned | Owned Capacity (MW) | Principal Fuels Used |
| --- | --- | ---: | ---: | ---: | --- |
| Guadalupe | TX | 1,000 | 100% | 1,000 | Natural gas |
| Odessa | TX | 1,000 | 100% | 1,000 | Natural gas |
| Total PSEG Texas |  | 2,000 |  | 2,000 |  |
| Kalaeloa | HI | 208 | 50% | 104 | Oil |
| GWF | CA | 105 | 50% | 53 | Petroleum coke |
| Hanford L.P. (Hanford) | CA | 27 | 50% | 13 | Petroleum coke |
| GWF Energy |  |  |  |  |  |
| Hanford—Peaker Plant | CA | 95 | 60% | 57 | Natural gas |
| Henrietta—Peaker Plant | CA | 97 | 60% | 58 | Natural gas |
| Tracy—Peaker Plant | CA | 171 | 60% | 103 | Natural gas |
| Total GWF Energy |  | 363 |  | 218 |  |
| Bridgewater | NH | 16 | 40% | 6 | Biomass |
| Conemaugh | PA | 15 | 4% | 1 | Hydro |
| **Total United States** |  | **2,734** |  | **2,395** |  |
| International(A) |  |  |  |  |  |
| PPN Power Generating Company Limited (PPN) | India | 330 | 20% | 66 | Naphtha/Natural gas |
| Turboven | Venezuela | 120 | 50% | 60 | Natural gas |
| Turbogeneradores de Maracay (TGM) | Venezuela | 40 | 9% | 4 | Natural gas |
| **Total International** |  | **490** |  | **130** |  |
| **Total Operating Power Plants** |  | **3,224** |  | **2,525** |  |

(A) We are continuing to explore options for our equity investments in PPN, Turboven and TGM.

### Transmission and Distribution Facilities

As of December 31, 2008, PSE&G’s electric transmission and distribution system included 23,164 circuit miles, of which 7,795 circuit miles were underground, and 818,219 poles, of which 542,162 poles were jointly-owned. Approximately 99% of this property is located in New Jersey.

In addition, as of December 31, 2008, PSE&G owned four electric distribution headquarters and five subheadquarters in four operating divisions, all located in New Jersey.

As of December 31, 2008, the daily gas capacity of PSE&G’s 100%-owned peaking facilities (the maximum daily gas delivery available during the three peak winter months) consisted of liquid petroleum air gas and liquefied natural gas and aggregated 2,973,000 therms (288,640,800 cubic feet on an equivalent basis of 1,030 Btu/cubic foot) as shown in the following table:

### Plant

### Location

### Daily Capacity

### (Therms)

Burlington LNG

Burlington, NJ

773,000

Camden LPG

Camden, NJ

280,000

Central LPG

Edison Twp., NJ

960,000

Harrison LPG

Harrison, NJ

960,000

### Total

### 2,973,000

As of December 31, 2008, PSE&G owned and operated 17,626 miles of gas mains, owned 12 gas distribution headquarters and two subheadquarters, all in three operating regions located in New Jersey and owned one meter shop in New Jersey serving all such areas. In addition, PSE&G operated 62 natural gas metering and regulating stations, all located in New Jersey, of which 26 were located on land owned by customers or natural gas pipeline suppliers and were operated under lease, easement or other similar arrangement. In some instances, the pipeline companies owned portions of the metering and regulating facilities.

PSE&G’s First and Refunding Mortgage, securing the bonds issued thereunder, constitutes a direct first mortgage lien on substantially all of PSE&G’s property.

PSE&G’s electric lines and gas mains are located over or under public highways, streets, alleys or lands, except where they are located over or under property owned by PSE&G or occupied by it under easements or other rights. PSE&G deems these easements and other rights to be adequate for the purposes for which they are being used.

### Office Buildings and Other Facilities

Power leases a portion of the 25-story office tower at 80 Park Plaza, Newark, New Jersey for its corporate headquarters. Other leased properties include office, warehouse, classroom and storage space, primarily located in New Jersey. Power also owns the Central Maintenance Shop at Sewaren, New Jersey.

Power has a 57.41% ownership interest in approximately 13,000 acres in the Delaware River Estuary region to satisfy the condition of the New Jersey Pollutant Discharge Elimination System (NJPDES) permit issued for Salem. Power also owns several other facilities, including the on-site Nuclear Administration and Processing Center buildings.

Power has a 13.91% ownership interest in the 650-acre Merrill Creek Reservoir in Warren County, New Jersey and approximately 2,158 acres of land surrounding the reservoir. The reservoir was constructed to store water for release to the Delaware River during periods of low flow. Merrill Creek is jointly-owned by seven companies that have generation facilities along the Delaware River or its tributaries and use the river water in their operations.

PSE&G rents office space from Services as its headquarters in Newark, New Jersey. PSE&G also leases office space at various locations throughout New Jersey for district offices and offices for various corporate groups and services. PSE&G also owns various other sites for training, testing, parking, records storage, research, repair and maintenance, warehouse facilities and other purposes related to its business.

In addition to the facilities discussed above, as of December 31, 2008, PSE&G owned 42 switching stations in New Jersey with an aggregate installed capacity of 22,809 megavolt-amperes and 245 substations with an aggregate installed capacity of 8,007 megavolt-amperes. In addition, four substations in New Jersey having an aggregate installed capacity of 109 megavolt-amperes were operated on leased property.

Services leases the majority of a 25-story office tower for PSEG’s corporate headquarters at 80 Park Plaza, Newark, New Jersey, together with an adjoining three-story building. As of January 1, 2009, Services transferred ownership of the Maplewood Test Services Facility in Maplewood, New Jersey to Power.

We believe that our subsidiaries maintain adequate insurance coverage against loss or damage to their plants and properties, subject to certain exceptions, to the extent such property is usually insured and insurance is available at a reasonable cost. For a discussion of nuclear insurance, see Note 11. Commitments and Contingent Liabilities.

## Legal proceedings

As filed, 11,213 characters.

We are party to various lawsuits and regulatory matters in the ordinary course of business. For information regarding material legal proceedings, other than those discussed below, see Item 1. Business—Regulatory Issues and Environmental Matters and Item 8. Financial Statements and Supplementary Data—Note 11. Commitments and Contingent Liabilities.

**Electric Discount and Energy Competition Act (Competition Act)**

On April 23, 2007, PSE&G and PSE&G Transition Funding LLC (Transition Funding) were served with a copy of a purported class action complaint (Complaint) in the Superior Court of New Jersey, Law Division challenging the constitutional validity of certain provisions of New Jersey’s Competition Act, seeking injunctive relief against continued collection from PSE&G’s electric customers of the Transition Bond Charge (TBC) of Transition Funding, as well as recovery of TBC amounts previously collected. Notice of the filing of the Complaint was also provided to New Jersey’s Attorney General. Under New Jersey law, the Competition Act, enacted in 1999, is presumed constitutional. On July 9, 2007, the same plaintiff filed an amended Complaint to also seek injunctive relief from continued collection of related taxes, as well as recovery of such taxes previously collected, and also filed a petition with the BPU requesting review and adjustment to PSE&G’s recovery of the same charges. PSE&G and Transition Funding filed a motion to dismiss the amended Complaint (or in the alternative for summary judgment) on July 30, 2007 and PSE&G filed a motion with the BPU on September 30, 2007 to dismiss the petition. On October 10, 2007, PSE&G’s and Transition Funding’s motion to dismiss the amended Complaint was granted. The plaintiff subsequently appealed this dismissal and, on February 6, 2009, the Appellate Division of the New Jersey Superior Court unanimously affirmed the lower court decision. The plaintiff has sought reconsideration of the decision by the Appellate Division. PSE&G’s motion to dismiss the BPU petition remains pending.

### Con Edison (Con Ed)

In November 2001, Con Ed filed a complaint with FERC against PSE&G, PJM and NYISO asserting a failure to comply with agreements between PSE&G and Con Ed covering 1,000 MW of transmission. These agreements are scheduled to expire in May 2012. However, PJM has filed contracts with FERC which would extend until 2017 the transmission service that is the subject of the disputed agreements. PSE&G protested PJM’s filing.

In August 2008, FERC issued an order setting for hearing and settlement procedures most of the issues raised by PSE&G in its protest. Following extensive discussions, on February 23, 2009, a settlement was filed at FERC resolving all issues in the proceedings, including all issues in the related proceedings at the D.C. Circuit Court of Appeals in connection with Con Ed’s November 2001 complaint. Although supported by PSE&G, Con Ed, PJM, the BPU and NYISO, one party failed to support the settlement. Comments on the settlement are scheduled to be filed in March 2009.

### Regulatory Proceedings

### RPM Auction

In May 2008, several state commissions, including the BPU and consumer advocate agencies, as well as customer groups and certain federal agencies filed a complaint with FERC against PJM with respect to RPM. The complaint challenged the results of the RPM capacity auctions held for the 2008/2009, 2009/2010 and 2010/2011 delivery years. They asserted that various RPM rules permitted suppliers to reduce the amount of capacity offered into the auctions, thereby increasing prices and requested that FERC find that the clearing prices produced are unlawful. The FERC issued an order dismissing the complaint in September 2008.

FERC’s dismissal of the complaint is still on rehearing before the FERC. If upheld on rehearing and on appeal, such dismissal eliminates the potential for the payment of refunds with respect to transitional auction payments made to generators in PJM, including Power.

### RPM Model

- ***PJM FERC Filing to Prospectively Change Elements of RPM—***After retaining an outside consultant to prepare a report evaluating the efficacy of the RPM model, PJM submitted a filing at FERC seeking to implement certain prospective changes to RPM. Issues in this proceeding included: the cost of new entry, the integration of transmission upgrades into RPM modeling, recognition of locational capacity value, participation in RPM by demand-side and energy efficiency resources, penalties for deficiencies and unavailability of capacity resources, and the calculation of avoided cost and long-term contracting to encourage new entry. On February 9, 2009, PJM filed an Offer of Settlement with the FERC on behalf of various settling parties. Several parties, including many state commissions, have indicated that they will not oppose the settlement. This Offer of Settlement proposes to, among other things, reduce cost of new entry values, eliminate the minimum offer price rule and develop seasonal capacity pricing. We filed comments in opposition to the settlement proposal on February 23, 2009. We cannot predict the outcome of this matter.
- ***Judicial Appeals—***There remain challenges to the original RPM design that are pending in the Court of Appeals. Specifically, we have filed briefs with the U.S. Court of Appeals for the District of Columbia Circuit due to concerns regarding the manner in which the cost of new entry is calculated. Other petitioners’ briefs, including the BPU, were also filed. We strongly support the RPM design but believe that certain components of the design should be modified.

If the cost of new entry is set too low, generators in the PJM markets may not be adequately compensated for existing capacity and may not have sufficient incentives to construct new generating units.

### Environmental Matters

The following items are environmental matters involving governmental authorities not discussed elsewhere in this Form 10-K. Power and PSE&G do not expect expenditures for any such site relating to the items listed below, individually or for all such current sites in the aggregate, to have a material effect on their respective financial condition, results of operations and net cash flows.

(1) Claim made in 1985 by the U.S. Department of the Interior under CERCLA with respect to the Pennsylvania Avenue and Fountain Avenue municipal landfills in Brooklyn, New York, for damages to natural resources. The U.S. Government alleges damages of approximately $200 million. To PSE&G’s knowledge there has been no action on this matter since 1988.

(2) Duane Marine Salvage Corporation Superfund Site is in Perth Amboy, Middlesex County, New Jersey. The EPA had named PSE&G as one of several potentially responsible parties (PRPs) through a series of administrative orders between December 1984 and March 1985. Following work performed by the PRPs, the EPA declared on May 20, 1987 that all of its administrative orders had been satisfied. The NJDEP, however, named PSE&G as a PRP and issued its own directive dated October 21, 1987. Remediation is currently ongoing.

(3) Various Spill Act directives were issued by the NJDEP to PRPs, including PSE&G with respect to the PJP Landfill in Jersey City, Hudson County, New Jersey, ordering payment of costs associated with operation and maintenance, interim remedial measures and a Remedial Investigation and Feasibility Study (RI/FS) in excess of $25 million. The directives also sought reimbursement of the NJDEP’s past and future oversight costs and the costs of any future remedial action.

(4) Claim by the EPA, Region III, under CERCLA with respect to a Cottman Avenue Superfund Site, a former non-ferrous scrap reclamation facility located in Philadelphia, Pennsylvania, owned and formerly operated by Metal Bank of America, Inc. PSE&G, other utilities and other companies are alleged to be liable for contamination at the site and PSE&G has been named as a PRP. A Final

43

|  |  |
| ---: | --- |
|  | Remedial Design Report was submitted to the EPA in September of 2002. This document presents the design details that will implement the EPA’s selected remediation remedy. PSE&G’s share of the remedy implementation costs is estimated at approximately $4 million. |
| (5) | The Klockner Road site is located in Hamilton Township, Mercer County, New Jersey, and occupies approximately two acres on PSE&G’s Trenton Switching Station property. PSE&G entered into a memorandum of agreement with the NJDEP for the Klockner Road site pursuant to which PSE&G conducted an RI/FS and remedial action at the site to address the presence of soil and groundwater contamination at the site. |
| (6) | The NJDEP assumed control of a former petroleum products blending and mixing operation and waste oil recycling facility in Elizabeth, Union County, New Jersey (Borne Chemical Co. site) and issued various directives to a number of entities, including PSE&G, requiring performance of various remedial actions. PSE&G’s nexus to the site is based upon the shipment of certain waste oils to the site for recycling. PSE&G and certain of the other entities named in the NJDEP directives are members of a PRP group that have been working together to satisfy NJDEP requirements including: funding of the site security program; containerized waste removal; and a site remedial investigation program. |
| (7) | Morton International, Inc., a subsidiary of Rohm and Haas Company, filed a lawsuit against the former customers of a former mercury refining operation located on the banks of Berry’s Creek in Wood Ridge, New Jersey. The lawsuit seeks to recover cleanup costs incurred and to be incurred in remediating the site. PSE&G was among the former customers sued based on allegations that mercury originating at its Kearny Generating Station was sent to the site for refining. |
| (8) | The EPA sent Power, PSE&G and approximately 157 other entities a notice that the EPA considered each of the entities to be a PRP with respect to contamination in Berry’s Creek in Bergen County, New Jersey and requesting that the PRPs perform a RI/FS on Berry’s Creek and the connected tributaries and wetlands. Berry’s Creek flows through approximately 6.5 miles of areas that have been used for a variety of industrial purposes and landfills. The EPA estimates that the study could be completed in approximately five years at a total cost of approximately $18 million. |
| (9) | In 2005, Exelon Generation advised us that it had signed an agreement for Peach Bottom regarding the DOE’s delay in accepting spent nuclear fuel for permanent storage. Under the agreement, Exelon Generation would be reimbursed for costs previously incurred, with future costs incurred resulting from the DOE delays in accepting spent fuel to be reimbursed annually until the DOE fulfills its obligation. In addition, Exelon Generation and Power are required to reimburse the DOE for the previously received credits from the Nuclear Waste Fund, plus lost earnings. We are currently in discussions with the DOE regarding our claims seeking damages for Salem and Hope Creek that were caused by the DOE’s delay in accepting spent nuclear fuel. |

## Management's discussion and analysis

As filed, 83,018 characters.

This combined MD&A is separately filed by PSEG, Power and PSE&G. Information contained herein relating to any individual company is filed by such company on its own behalf. Power and PSE&G each make representations only as to itself and make no representations whatsoever as to any other company.

PSEG’s business consists of three reportable segments, which are:

- **Power**, our wholesale energy supply company that integrates its generating asset operations with its wholesale energy, fuel supply, energy trading and marketing and risk management activities primarily in the Northeast and Mid Atlantic U.S.;
- **PSE&G**, our public utility company which provides transmission and distribution of electric energy and gas in New Jersey; and
- **Energy Holdings**, which owns our other generation assets and holds other energy-related investments.

### OVERVIEW OF 2008 AND FUTURE OUTLOOK

Our business discussion in Item 1 provides a review of the regions and markets where we operate and compete, as well as our strategy for conducting our businesses within these markets, focusing on operational excellence, financial strength and making disciplined investments. The following discussion expands upon that discussion by describing significant events and business developments that have occurred during 2008 and key factors that will drive our future performance.

### Operational Excellence

Market prices for electricity, fuels and other commodities related to our generation business are volatile, which can impact our business results positively or negatively, especially if sustained beyond our current contract periods.

Given this volatility in the market, a key factor in our success is our ability to operate our nuclear and fossil generating stations at sufficient capacity factors in order to limit the need to purchase higher-priced electricity to satisfy obligations under our sales contracts.

In 2008, we completed projects at Hope Creek and Salem stations, increasing our nominal generating capacity by a total of approximately 173 MW. This additional capacity, combined with an increase in the capacity factor at our nuclear facilities from 91% in 2007 to 93% in 2008 and the improved output from our fossil plants drove an increase in the total output from our Northeast/Mid Atlantic generating facilities from approximately 53,200 GWh in 2007 to 55,300 GWh in 2008.

Our estimated fuel needs are subject to change based upon the level of our operations as well as upon market demands for, and on the price of, coal. We have recently renegotiated our coal contract with a key supplier which will increase coal costs. For additional information, see Item 1. Business. We believe we can continue to manage our fuel sourcing needs in this dynamic market but changes in prices and demand could impact our future operations or financial results.

Over the long-term, our success also depends on the continuation of reasonable prices in the energy and capacity markets. We must also be able to effectively manage our construction projects and continue to economically operate our generation facilities under increasingly stringent environmental requirements, including legislation, regulation and voluntary restrictions that address:

- the control of carbon dioxide emissions to reduce the effects of global climate change and greenhouse gas;
- other emissions such as nitrogen oxide, sulfur dioxide and mercury; and

49

- the potential need for significant upgrades to existing intake structures and cooling systems at our larger once-through cooled plants, including Salem, Hudson, Mercer, Sewaren, New Haven and Bridgeport.

Our operations could also be impacted by regulatory or legislative actions favoring non-competitive markets, energy efficiency initiatives, and regulatory policies favoring the construction of rate-based transmission that may result in increased imports of generation, which may be subject to less stringent environmental regulation, into areas served by our generation assets. Also, at times, some of the market-based mechanisms in which we participate, including BGS auctions and RPM capacity payments, are the subject of review or discussion in the regulatory and political arenas by participants including FERC, the BPU, and the PJM market monitor. Accordingly, we can provide no assurance that any or all of these mechanisms will continue to exist in their current form. For additional information, see Item 1. Business—Regulatory Issues.

Due to market volatility, strong competition, market complexity and constantly changing forward prices, there can be no assurance that we will be able to continue to contract our generation output at attractive prices. While higher forward prices may have a potentially significant beneficial impact on margins, they would also raise any replacement power costs that we may incur in the event of unanticipated outages, and could also further increase liquidity requirements as a result of contract obligations. For additional information on liquidity requirements, see Liquidity and Capital Resources.

Our operations focus on maintaining system reliability and safety levels. During 2008, we continued to attain top decile performance in our ability to limit service interruptions, outage restoration times and gas leaks per mile.

Our utility operation results depend on the treatment of the various rate and other issues by the BPU and FERC, as well as other state and federal regulatory agencies. Therefore, our success will depend on our ability to:

- continue cost containment initiatives;
- attain an adequate return on the investments we plan to make in our electric and gas transmission and distribution system; and
- continue recovery of the regulatory assets we have deferred.

We expect to file a joint electric and gas rate case by mid 2009 with a request that rates become effective in 2010.

The FERC has recently approved our petition to implement formula rates for our existing and future transmission investments. This forward-looking formula rate mechanism allows us to update our transmission rates annually based on forecasted Operation and Maintenance Expense and capital expenditures for the coming year, with no lag of recovery, and will provide for a true-up to actual expenditures in the subsequent year.

### Financial Strength

We continued to take steps to strengthen our financial position during 2008. We reduced our international investment exposure through the sale of the SAESA Group in Chile and our 85% ownership interest in Bioenergie in Italy and used the proceeds from these assets sales and other cash on hand to reduce outstanding debt. We repurchased 2,382,200 shares of our Common Stock under a program authorized by the Board of Directors in August and added capacity to our credit facilities during the year. We also reduced our financial risk by establishing a reserve for a significant percentage of our leveraged lease related tax exposure.

We believe that our strong operations and strong financial position will allow us to manage through the current weakening financial markets which has resulted in increased costs of borrowing as well as significant reductions in the value of both our pension trust and Nuclear Decommissioning Trust (NDT) funds. The reduction in value of the pension trust fund during the year is expected to result in an increase to pension expense of $131 million in 2009 as compared to 2008. We will also likely make additional cash contributions of up to $275 million for pension funding in 2009.

Total pension costs were $37 million in 2008 and are projected to be approximately $215 million in 2009. Of the total amount of pension expense, the amounts recognized in 2008 and expected to be recognized in 2009 in the Consolidated Statements of Operations are as follows:

|  | 2008 Millions | 2009 Expected |
| --- | ---: | ---: |
| Power | $14 | $77 |
| PSE&G | 15 | 82 |
| Energy Holdings | 2 | 3 |
| **Total** | **$31** | **$162** |

The amounts above include the portion of Services’ costs charged to each company. The difference between total cost and amounts recognized in the Consolidated Statements of Operations is due to amounts capitalized.

We have and will continue to review our other proposed spending in response to these market concerns. Going forward, we will continue to focus on reducing costs while maintaining our safety and reliability standards.

We expect that our cash from our operations, when combined with cash on hand, will be the primary source used to:

- support our projected capital expenditure program,
- fund shareholder dividends,
- fund contributions to the pension funds, and
- provide for potential payments to address income tax claims related to our leveraged lease transactions, discussed in Note 11. Commitments and Contingent Liabilities.

Any funds remaining after satisfying these obligations, when combined with potential additional financing capacity, would be discretionary cash that could be used to invest in the business, reduce debt and/or repurchase common stock.

### Disciplined Investment

During 2008, we also continued to pursue investments focusing on areas that complement our existing businesses and provide prudent growth opportunities. These areas include responding to climate change and continuing to improve environmental performance, upgrading critical energy infrastructure and providing new energy supplies in a disciplined manner. Some examples of actions taken pursuant to this investment philosophy include:

- Construction of back end technology at Mercer, Hudson and Keystone stations to meet our environmental commitments.
- Conducting engineering and design work in connection with the Susquehanna-Roseland 500 kV transmission project with construction expected to begin in early 2010 to meet a 2012 in-service date. Our share of this transmission project is expected to cost $750 million over the next four years.
- Proposing stimulus programs to the BPU for us to invest approximately $888 million in capital infrastructure and energy efficiency programs over a two-year period beginning in April 2009.

51

- Making funds available for approximately $105 million in a solar energy pilot program designed to spur investment in solar power in New Jersey to meet energy goals under the Energy Master Plan.
- Filing a new solar initiative with the BPU seeking to invest approximately $773 million to develop 120 MW of solar power over a five-year horizon.
- Pursuing construction of 130 MW of gas-fired peaking capacity in Connecticut for an estimated cost of $130 million to $140 million, with construction commencing in June 2011.
- Pursuing the potential development of an offshore wind project, and a modest amount of solar and other renewable energy projects at Energy Holdings.

There is no guarantee that these or future initiatives will be achieved since many issues need to be favorably resolved, such as system reliability concerns, regulatory approvals and construction or development costs.

### RESULTS OF OPERATIONS

| Earnings (Losses) In Millions Years Ended December 31, | 2008 | 2007 | 2006 |
| --- | ---: | ---: | ---: |
| Power | $1,050 | $949 | $515 |
| PSE&G | 364 | 380 | 265 |
| Energy Holdings (A) | (403) | 63 | (30) |
| Other (B) | (28) | (67) | (77) |
| **PSEG Income from Continuing Operations** | **983** | **1,325** | **673** |
| Income from Discontinued Operations, Including Gain on Disposal (C) | 205 | 10 | 66 |
| **PSEG Net Income** | **$1,188** | **$1,335** | **$739** |

| Earnings Per Share (Diluted) Years Ended December 31, | 2008 | 2007 | 2006 |
| --- | ---: | ---: | ---: |
| **PSEG Income from Continuing Operations** | **$1.93** | **$2.60** | **$1.33** |
| Income from Discontinued Operations, Including Gain on Disposal (C) | 0.41 | 0.02 | 0.13 |
| **PSEG Net Income** | **$2.34** | **$2.62** | **$1.46** |

(A) Energy Holdings results include after-tax charges of $490 million taken in 2008 related to leveraged lease transactions, $23 million of after-tax loss resulting from the sale of Chilquinta and Luz del Sur (LDS) in 2007; and a $178 million after-tax loss on the sale of Rio Grande Energia S.A. in 2006.

(B) Other includes parent company interest and financing costs, donations and certain administrative and general expenses.

(C) See Note 3. Discontinued Operations, Dispositions and Impairments.

Our results include the realized gains, losses and earnings on Power’s NDT Funds and other related activity. This includes the net realized gains and other-than-temporary impairments, as well as interest and dividend income and other costs related to the NDT Funds which are recorded in Other Income and Deductions. The total amounts recorded in Other Income and Deductions related to the NDT Funds, including the net realized gains (losses), were $(115) million, $48 million and $64 million for the years ended December 31, 2008, 2007 and 2006, respectively. The interest accretion expense on Power’s asset retirement obligation, which primarily relates to the decommissioning of the nuclear power plants for which the NDT Funds are maintained, is recorded in Operation and Maintenance Expense and was $25 million, $23 million and $33 million for the years ended December 31, 2008, 2007 and 2006, respectively. The combined after-tax impact on earnings of this activity for the years ended December 31, 2008, 2007 and 2006 was as follows:

*NDT Fund Activity*

*In Millions, after tax*

| 2008 | 2007 | 2006 |
| ---: | ---: | ---: |
| $(71) | $12 | $11 |

Our results also include the following after-tax impacts of mark-to-market (MTM) activity.

*Non-Trading Mark-to-Market*

*In Millions, after tax*

|  | 2008 | 2007 | 2006 |
| --- | ---: | ---: | ---: |
| Power | $14 | $(6) | $(1) |
| Energy Holdings | 2 | 16 | 29 |
| **Total** | **$16** | **$10** | **$28** |

### PSEG

Our results of operations are primarily comprised of the results of operations of our operating subsidiaries, Power, PSE&G and Energy Holdings, excluding changes related to intercompany transactions, which are eliminated in consolidation. We also include certain financing costs, donations and general and administrative costs at the parent company. For additional information on intercompany transactions, see Note 21. Related-Party Transactions.

|  | For the Years Ended December 31, 2008 Millions | 2007 | 2006 | Increase / (Decrease) 2008 vs 2007 Millions% |  | Increase / (Decrease) 2007 vs 2006 Millions% |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Operating Revenues | $13,322 | $12,677 | $11,735 | $645 | 5 | $942 | 8 |
| Energy Costs | 7,295 | 6,512 | 6,544 | 783 | 12 | (32) | (0) |
| Operation and Maintenance | 2,486 | 2,406 | 2,260 | 80 | 3 | 146 | 6 |
| Depreciation and Amortization | 792 | 774 | 808 | 18 | 2 | (34) | (4) |
| Income from Equity Method Investments | 37 | 115 | 115 | (78) | (68) | — | — |
| Gain (Loss) on Sale of and (Impairment) on Equity Method Investments | (27) | 137 | (272) | (164) | N/A | 409 | N/A |
| Other Income and Deductions | (116) | 22 | 89 | (138) | N/A | (67) | (75) |
| Interest Expense | (594) | (727) | (788) | (133) | (18) | (61) | (8) |
| Income Tax Expense | (926) | (1,064) | (457) | (138) | (13) | 607 | N/A |
| Income (Loss) from Discontinued Operations, net of tax | 33 | (38) | 47 | 71 | N/A | (85) | N/A |
| Gain on Disposal of Discontinued Operations, net of tax | 172 | 48 | 19 | 124 | N/A | 29 | N/A |

The 2008 year-over-year decrease in our Income from Continuing Operations reflects the following:

¡ After-tax charges of $490 million were recorded in June 2008 associated with deductions taken for tax purposes on certain types of leveraged lease transactions at Energy Holdings that are being challenged by the IRS. See Note 11. Commitments and Contingent Liabilities for additional information.

|  |  |
| --- | --- |
| ¡ | Earnings were slightly lower at PSE&G due to lower gas delivery sales and higher Operations and Maintenance expense. |
| ¡ | Earnings were higher at Power due to higher prices realized under sales contracts and higher sales volumes, partially offset by higher generation costs, losses in the NDT Funds and higher Operation and Maintenance Costs. |
| ¡ | Excluding the lease transaction charges, Energy Holdings earnings were higher due to lower interest and bond premiums and improved operations at the Texas generation facilities, partially offset by lower income from assets sold. |

For a detailed explanation of the variances, see the discussions for Power, PSE&G and Energy Holdings below.

### Power

### For the Years Ended

### December 31,

### Increase /

### (Decrease)

### Increase /

### (Decrease)

### 2008

### 2007

### 2006

### 2008 vs 2007

### 2007 vs 2006

Millions

Income from Continuing Operations

1,050

949

515

101

434

Loss from Discontinued Operations, including Loss on Disposal, net of tax

(8

(239

(8

(231

Net Income

1,050

941

276

93

203

For the year ended December 31, 2008, the primary reasons for the increase in Income from Continuing Operations were

- higher prices and sales volumes on BGS contracts and in the various power pools, partially offset by higher generation costs, and
- higher prices on a reduced sales volume under the BGSS contract due to customer conservation and a milder winter heating season in 2008,
- partially offset by net losses on investments in the NDT Funds.

For the year ended December 31, 2007, the primary reasons for the increase in Income from Continuing Operations were

- higher prices realized from new contracts, including BGS contracts, combined with higher sales volumes and lower generation costs, and
- improved margins and higher sales volumes under the BGSS contract due to a colder winter heating season and more favorable fuel pricing in 2007.

54

The year-over-year detail for these variances for these periods are discussed below:

| Power | For the Years Ended December 31, 2008 Millions | 2007 | 2006 | Increase / (Decrease) 2008 vs 2007 Millions% |  | Increase / (Decrease) 2007 vs 2006 Millions% |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Operating Revenues | $7,770 | $6,796 | $6,057 | $974 | 14 | $739 | N/A |
| Energy Costs | 4,556 | 3,975 | 3,955 | 581 | 15 | 20 | 1 |
| Operation and Maintenance | 1,054 | 1,001 | 1,002 | 53 | 5 | (1) | — |
| Depreciation and Amortization | 164 | 140 | 140 | 24 | 17 | — | — |
| Other Income and Deductions | (121) | 69 | 66 | (190) | (275) | 3 | 5 |
| Interest Expense | (164) | (159) | (148) | 5 | 3 | 11 | 7 |
| Income Tax Expense | (661) | (641) | (363) | 20 | 3 | 278 | 77 |
| Loss from Discontinued Operations, including Loss on Disposal, net of tax | $— | $(8) | $(239) | $8 | 100 | $(231) | (97) |

### For the year ended December 31, 2008 as compared to 2007

**Operating Revenues** increased $974 million due to:

- ***Generation*** revenues increased $797 million due to

a net increase of $355 million from higher prices on a higher volume of BGS contracts modestly offset by the expiration of several contracts in May 2008,

higher revenues of $331 million and $20 million resulting from a higher volume of generation being sold at higher prices into PJM and NEPOOL, respectively,

$33 million from higher prices on a lower volume of sales in the New York power pool,

$67 million from higher capacity prices resulting from the changes in the capacity markets in PJM, New York and Connecticut, and

$32 million for ancillary and other services as well as a damage claim awarded by the federal government for an oil spill in the Delaware River in 2004,

partially offset by $25 million of net losses on financial hedging transactions.

- ***Gas Supply*** revenues increased $154 million

|  |  |
| --- | --- |
| ¡ | including $130 million resulting from sales under the BGSS contract, comprised of $208 million from higher prices partly offset by lower sales volumes of $78 million due to customer conservation and milder winter temperatures in 2008, and |
| ¡ | a net increase of $27 million due to higher prices on sales to third party customers on a reduced sales volume. |

- ***Trading*** revenues increased $23 million principally due to gains on electric-related contracts and contracts related to financial transmission rights.

### Operating Expenses

- ***Energy Costs*** represent the cost of generation, which includes fuel purchases for generation as well as purchased energy in the market, and gas purchases to meet Power’s obligation under its BGSS contract with PSE&G. Energy Costs increased by $581 million due to:

¡ **Generation costs** increased by $410 million due to $445 million of higher fuel costs related to higher prices and higher volumes of natural gas and $17 million of higher costs of purchases reflecting higher prices, partly offset by net gains of $59 million from financial hedging transactions.

¡ **Gas costs** increased $171 million, reflecting net increases of $150 million and $34 million related to Power’s obligations under the BGSS contract and sales to third party customers, respectively, reflecting higher inventory costs partially offset by reduced volumes. These increases were partially offset by a reduction of $14 million in losses on financial hedging transactions in 2008 as compared to 2007.

***Operation and Maintenance*** increased $53 million primarily due to

|  |  |
| --- | --- |
| ¡ | a net increase of $47 million due to planned outages and higher maintenance costs at our fossil stations, primarily Hudson and Linden, and |
| ¡ | an increase of $10 million related to planned outages at the Peach Bottom and Salem stations. |

- ***Depreciation and Amortization*** increased $24 million due to

|  |  |
| --- | --- |
| ¡ | an increase of $14 million resulting from a larger depreciable nuclear and fossil asset base in 2008, and |
| ¡ | an increase of $9 million due to depreciation of pollution control equipment being placed into service at our Bridgeport generating facility. |

**Other Income and Deductions** decreased $190 million due to

- higher charges of $147 million ($219 million in 2008 versus $72 million in 2007) for other-than-temporary impairments related to the NDT Fund securities,
- net unrealized losses of $24 million on the NDT Fund derivative instruments,
- lower interest income of $13 million from short-term loans to our parent company, and
- a $13 million charge for the purchase of net operating loss carryforwards under the State of New Jersey Tax Benefit Purchase Program,
- partially offset by an increase of $5 million from net realized income related to the NDT Funds.

**Interest Expense** increased $5 million primarily due to the issuance of $40 million of 5.75% Pollution Control Bonds due 2037 in November 2007 and $44 million of 4.00% Pollution Control Bonds due 2042 in December 2007.

**Income Tax Expense** increased $20 million in 2008 primarily due to

- an increase of $50 million due to higher pre-tax income,
- partially offset by a reduction of $16 million due to lower earnings from the NDT Funds, and
- a reduction of $9 million due to increased benefits from a manufacturing deduction under the American Jobs Creation Act of 2004.

### For the year ended December 31, 2007 as compared to 2006

**Operating Revenues** increased $739 million due to:

- ***Generation*** revenues increased $416 million

|  |  |
| --- | --- |
| ¡ | due to higher revenues of $355 million from higher prices on BGS fixed-price contracts, and |
| ¡ | $149 million from higher capacity prices resulting from the changes in the capacity markets in PJM and Connecticut, which resulted in $47 million in reduced RMR revenues in these markets. |
| ¡ | Power also had increased revenues resulting from more generation being sold into the various pools following the expiration of certain wholesale power contracts. The increased revenues from sales into the various pools offset the reduction in wholesale contract revenues. |

56

- ***Gas Supply*** revenues increased $349 million

including $248 million resulting from higher sales volumes under the BGSS contract, largely due to colder average temperatures in the 2007 winter heating season,

recognition of gains of $69 million on financial hedging transactions, and

to a lesser degree, increases due to increased pricing and volumes sold to other gas distributors and increased revenues received for balancing and storage due to higher sales volumes and higher tariff rates that became effective in January 2007.

- **Trading** revenues decreased $26 million mainly due to the absence of gains related to emissions credits that were realized in 2006.

### Operating Expenses

- ***Energy Costs*** increased $20 million due to:

|  |  |
| --- | --- |
| ¡ | Gas Costs increased $247 million due to a $209 million net increase from a higher volume of gas sold at lower prices to satisfy Power’s BGSS obligations, an increase of $22 million from a higher volume of sales to third party customers and an increase of $16 million due to the recognition of losses in 2007 coupled with gains in 2006 related to financial hedging transactions. |
| ¡ | Generation Costs decreased $227 million due to lower pool purchases of $240 million, resulting from reduced load obligations in Connecticut following the expiration of a wholesale power contract in 2006, combined with $124 million in lower congestion and transmission costs. These decreases were partially offset by an increase of $154 million due to higher volumes of fuel purchases, primarily natural gas, as these units ran more during 2007. |

- ***Operation and Maintenance*** decreased $1 million due to

|  |  |
| --- | --- |
| ¡ | a write-down of $44 million in 2006 related to four turbines which were sold in April 2007. For additional information, see Note 3. Discontinued Operations, Dispositions and Impairments, |
| ¡ | mostly offset by an increase of $43 million due to costs incurred in 2007 related to various maintenance projects at certain fossil stations, mainly Hudson and Mercer. |

- ***Depreciation and Amortization*** experienced no material change

**Other Income and Deductions** increased $3 million due to

- increased net realized income of $42 million related to the NDT Funds,
- the absence of $14 million of penalties that were recorded in 2006 related to negotiations concerning environmental concerns and an alternate pollution reduction plan for Hudson, and
- increased interest income of $13 million from short-term loans to our parent company,
- partially offset by increased charges of $58 million recorded in 2007 for other-than-temporary impairments related to the NDT Fund securities, and
- the absence of $6 million of expense reversals recorded in 2006 related to certain excess liability reserves.

57

**Interest Expense** increased $11 million due to

- a $20 million increase due to the reclassification of Interest Expense to Discontinued Operations of the Lawrenceburg facility combined with a $23 million increase due to the absence of capitalized interest related to the Linden construction project since its completion in May 2006,
- partially offset by a reduction of $15 million due to interest capitalized on a higher volume of construction projects in 2007,
- the absence of $10 million of interest expense in 2007 due to the maturity of the 6.87% Senior Notes in April 2006, as well as
- decreases in interest incurred on lower average short-term borrowings from our parent company and lower commitment and letter of credit fees.

**Income Tax Expense** increased $278 million in 2007 primarily due to higher pre-tax income.

### Loss from Discontinued Operations, including Loss on Disposal, net of tax

In connection with the sale of its Lawrenceburg generation facility, Power recorded an after-tax charge of $208 million which was reflected in Discontinued Operations in the fourth quarter of 2006. After-tax Losses from Discontinued Operations of Lawrenceburg, not including the Loss on Disposal, were $8 million and $31 million for the years ended December 31, 2007 and 2006, respectively. See Note 3. Discontinued Operations, Dispositions and Impairments for additional information.

### PSE&G

|  | For the Years Ended December 31, 2008 Millions | 2007 | 2006 | Increase / (Decrease) 2008 vs 2007 | Increase / (Decrease) 2007 vs 2006 |
| --- | ---: | ---: | ---: | ---: | ---: |
| Income from Continuing Operations | $364 | $380 | $265 | $(16) | $115 |
| Net Income | $364 | $380 | $265 | $(16) | $115 |

For the year ended December 31, 2008, the primary reasons for the decrease in Income from Continuing Operations were

- lower revenues due to lower customer demand resulting from current economic conditions, and
- lower electric and gas sales volumes due to a milder winter heating season,
- partially offset by FIN 48 tax adjustments related to an IRS refund and other tax items.

For the year ended December 31, 2007, the primary reasons for the increase in Income from Continuing Operations were

- the full year effect of the electric and gas base rate increases which became effective in November 2006, and
- the return to a normal heating load (degree days were 16% higher in 2007 compared to 2006) for gas and a 2% growth in electric sales.

58

The year-over-year detail for these variances for these periods are discussed below:

| PSE&G | For the Years Ended December 31, 2008 Millions | 2007 | 2006 | Increase / (Decrease) 2008 vs 2007 Millions% |  | Increase / (Decrease) 2007 vs 2006 Millions% |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Operating Revenues | $9,038 | $8,493 | $7,569 | $545 | 6 | $924 | 12 |
| Energy Costs | 6,072 | 5,498 | 4,884 | 574 | 10 | 614 | 13 |
| Operation and Maintenance | 1,338 | 1,308 | 1,160 | 30 | 2 | 148 | 13 |
| Depreciation and Amortization | 583 | 591 | 620 | (8) | (1) | (29) | (5) |
| Other Income and Deductions | 8 | 12 | 22 | (4) | (33) | (10) | (45) |
| Interest Expense | (325) | (332) | (346) | (7) | (2) | (14) | (4) |
| Income Tax Expense | (228) | (257) | (183) | (29) | (11) | 74 | 40 |

### For the year ended December 31, 2008 as compared to 2007

**Operating Revenues** increased $545 million primarily due to:

- ***Commodity*** related revenues increased $573 million due to

increased electric revenues of $432 million primarily due to $379 million in higher BGS revenues (higher auction prices of $491 million offset by decreased sales of $112 million) and $75 million in higher non-utility generation (NUG) prices, and

¡ increased gas revenues of $141 million due to $234 million in increased BGSS prices offset by $93 million in lower sales due to weather and economic conditions.

- ***Delivery*** revenues decreased $23 million due to

|  |  |
| --- | --- |
| ¡ | decreased gas revenues of $23 million due to $14 million of lower SBC revenues and $9 million of lower sales due to weather and economic conditions. The SBC revenues were 10% lower in 2008, and |
| ¡ | flat electric revenues including $49 million in decreased sales and demands due to weather and economic conditions and a lower transmission peak, offset by $49 million for SBC, securitization transition charge and transmission rate increases. PSE&G retains no margins from SBC or STC collections as the revenues are offset in operating expenses below. |

### Operating Expenses

- ***Energy Costs*** increased $574 million due to

|  |  |
| --- | --- |
| ¡ | increased electric costs of $432 million due to $556 million or 17% in higher prices for BGS and NUG purchases offset by $124 million or 4% in lower BGS volumes due to weather and economic conditions, and |
| ¡ | increased gas costs of $142 million due to $234 million or 11% in higher prices offset by $93 million or 4% in lower sales volumes due to weather and economic conditions. |

- ***Operation and Maintenance*** increased $30 million primarily due to

|  |  |
| --- | --- |
| ¡ | increases in Electric SBC expenses of $42 million, and |
| ¡ | $8 million of bad debt expense, |
| ¡ | partially offset by lower injuries and damages of $8 million, |
| ¡ | lower gas SBC expenses of $6 million which were offset in delivery revenues with no impact on net income, and |

59

¡ decreased payroll and fringes of $8 million.

- ***Depreciation and Amortization*** decreased $8 million due to

decreases of $10 million for amortization of regulatory assets,

$5 million in software amortization, and

$5 million in amortization of DOE enrichment facility decommissioning costs,

partially offset by increases of $12 million due to additional plant in service.

**Other Income and Deductions** decreased $4 million due to

- $7 million in lower investment income due to current market conditions,
- partially offset by a $3 million reduction in income tax gross-ups on contributions in aid of construction (CIAC). CIAC is taxable and PSE&G recognizes the gross-up as income when collected.

**Interest Expense** experienced no material change.

**Income Tax Expense** decreased $29 million primarily due to

- $18 million on lower pre-tax income, and
- $17 million in FIN 48 adjustments related to an IRS refund.

### For the year ended December 31, 2007 as compared to 2006

**Operating Revenues** increased $924 million primarily due to:

- ***Commodity*** related revenues increased $613 million due to

¡ increased electric revenues of $510 million due to

|  |  |
| --- | --- |
| ™ | $541 million in higher BGS revenues (higher auction prices of $484 million plus increased sales of $57 million), and |
| ™ | $44 million in higher NUG prices, |
| ™ | offset by a $74 million decrease in the NGC revenues ($78 million in lower prices due to a March 2007 rate change offset by $4 million in higher volumes), |

¡ increased gas revenues of $103 million due to $240 million in increased sales due to weather offset by $137 million in lower BGSS prices.

- ***Delivery*** revenues increased $301 million due to

|  |  |
| --- | --- |
| ¡ | Electric revenues increased $169 million due to $83 million for increased SBC rates, $42 million due to increased base rates effective November 2006 and $44 million in increased sales and demands primarily due to weather. |
| ¡ | Gas revenues increased $132 million due to weather, $39 million due to the SBC rate increases in November 2006 and March 2007 and $31 million due to base rate increases effective November 2006. |

### Operating Expenses

- ***Energy Costs*** increased $614 million due to

|  |  |
| --- | --- |
| ¡ | increased electric costs of $512 million due to $453 million or 18% in higher prices for BGS and NUG purchases and $59 million or 2% in higher BGS volumes due to weather, and |
| ¡ | increased gas costs of $102 million due to a $239 million or 11% increase in sales volumes due to weather offset by $137 million in lower prices. |

60

- ***Operation and Maintenance*** increased $148 million primarily due to

increased SBC expenses of $132 million resulting from rate increases in November 2006 and March 2007, which were offset in delivery revenues with no impact on net income,

increased payroll of $16 million, and

a higher reserve for injuries and damages of $10 million,

partially offset by $19 million in lower pension expenses.

- ***Depreciation and Amortization*** decreased $29 million due to

|  |  |
| --- | --- |
| ¡ | decreases of $30 million due to revised plant depreciation rates and $11 million due to lower cost of removal rates, both resulting from the November 2006 rate case, and |
| ¡ | a decrease of $8 million for software fully amortized in 2006, |
| ¡ | partially offset by increases of $11 million due to amortization of regulatory assets and $9 million due to additional plant in service. |

**Other Income and Deductions** decreased $10 million primarily due to a $7 million reduction in income tax gross-ups on CIAC.

**Interest Expense** decreased $14 million due to

- lower interest expense of $12 million related to settlement of IRS audits in 2006, and
- lower interest on regulatory clauses of $7 million,
- partially offset by an increase of $5 million due to new debt issuances in December 2006 and May 2007.

**Income Tax Expense** increased $74 million primarily due to higher pre-tax income.

### Energy Holdings

|  | For the Years Ended December 31, 2008 Millions | 2007 | 2006 | Increase / (Decrease) 2008 vs 2007 | Increase / (Decrease) 2007 vs 2006 |
| --- | ---: | ---: | ---: | ---: | ---: |
| Income (Loss) from Continuing Operations | $(403) | $63 | $(30) | $(466) | $93 |
| Income from Discontinued Operations, including Gain on Disposal, net of tax | 205 | 18 | 305 | 187 | (287) |
| Net Income (Loss) | $(198) | $81 | $275 | $(279) | $(194) |

For the year ended December 31, 2008, the primary reasons for the decrease in Income from Continuing Operations were

- the after-tax charge on leveraged leases recorded in the second quarter in 2008, and
- the absence of income from Chilquinta and LDS which were sold in 2007,
- partially offset by lower interest expense due to debt retirement and lower premium on bond redemption, and
- FIN 48 tax adjustments related to an IRS refund.

For the year ended December 31, 2007, the primary reasons for the increase in Income from Continuing Operations were

- the absence of the loss on the sale of RGE in 2006,
- partially offset by

lower operational earnings at our Texas plants, driven by lower volume and lower unrealized MTM gains, partially offset by higher prices,

the loss resulting from the sale of Chilquinta and LDS in 2007,

higher premium on bond redemption, and

lower leveraged lease income in 2007.

The year-over-year detail for these variances for these periods are below:

| Energy Holdings | For the Years Ended December 31, 2008 Millions | 2007 | 2006 | Increase / (Decrease) 2008 vs 2007 Millions% |  | Increase / (Decrease) 2007 vs 2006 Millions% |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Operating Revenues | $345 | $793 | $929 | $(448) | (56) | $(136) | (15) |
| Energy Costs | 496 | 439 | 515 | 57 | 13 | (76) | (15) |
| Operation and Maintenance | 128 | 126 | 127 | 2 | 2 | (1) | (2) |
| Depreciation and Amortization | 29 | 30 | 28 | (1) | (3) | 2 | 7 |
| Income from Equity Method Investments | 37 | 115 | 115 | (78) | (68) | — | — |
| Gain (Loss) on Sale of and (Impairment) on Equity Method Investments | (27) | 137 | (272) | (164) | N/A | 409 | N/A |
| Other Income and (Deductions) | 25 | (25) | 15 | 50 | N/A | (40) | N/A |
| Interest Expense | (83) | (151) | (183) | (68) | (45) | (32) | (17) |
| Income Tax (Expense) Credit | (47) | (211) | 36 | (164) | (78) | 247 | N/A |
| Income from Discontinued Operations, including Gain (Loss) on Disposal, net of tax | $205 | $18 | $305 | $187 | N/A | $(287) | (94) |

### For the year ended December 31, 2008 as compared to 2007

**Operating Revenues** decreased $448 million primarily due to

- $485 million charge on leveraged leases in 2008, and
- $38 million decrease in leveraged lease income, due to lease adjustments,
- partially offset by $87 million in higher revenue from our Texas plants due to

|  |  |
| --- | --- |
| ¡ | $172 million increase in electricity prices, |
| ¡ | partially offset by $31 million in higher unrealized MTM losses, and |
| ¡ | a $54 million decrease in electricity sales. |

### Operating Expenses

- ***Energy Costs*** increased $57 million related to our Texas plants primarily due to

|  |  |
| --- | --- |
| ¡ | $103 million for higher fuel prices, |
| ¡ | partially offset by $41 million in lower fuel consumption, and |
| ¡ | $9 million in higher unrealized MTM gains on gas purchases driven by strengthening of the forward market curve for 2008 and beyond. |

- ***Operation and Maintenance*** increased $2 million primarily due to higher scheduled maintenance at our Texas plants.
- ***Depreciation and Amortization*** experienced no material change.

62

**Income from Equity Method Investments** decreased $78 million primarily due to

- the absence of earnings of $65 million from Chilquinta and LDS which were sold in 2007, and
- $7 million in lower income from GWF, due to higher fuel costs and lower generation.

**Gain (Loss) on Sale of and Impairment on Equity Method Investments** decreased $164 million due to

- the absence of $153 million pre-tax gain on the sale of equity investments in 2007, and
- $11 million in higher write-downs of investment in PPN and Turboven in 2008 as compared to 2007.

**Other Income and Deductions** increased $50 million primarily due to

- $46 million of lower loss on the early retirement of debt resulting from the December 2007 redemption of Energy Holdings’ 10% Senior Notes due 2009, and
- $6 million of higher interest and dividend income.

**Interest Expense** decreased $68 million primarily due to lower debt balances.

**Income Tax Expense** decreased $164 million primarily due to

- the absence of $163 million of taxes recorded as a result of the sale of Chilquinta and LDS in 2007, and
- $37 million of lower FIN 48 expense,
- partially offset by $14 million in higher taxes on pre-tax income and $18 million of federal and state audit adjustments for prior years paid in 2008.

### Income from Discontinued Operations, including Gains on Disposal, net of tax

¡ ***Electroandes***

In October 2007, we sold our investment in Electroandes. Income from Discontinued Operations, including Gain on Disposal, related to Electroandes for the years ended December 31, 2007 and 2006 was $58 million and $16 million respectively.

### SAESA Group

In July 2008, we sold our investment in SAESA Group. Income from Discontinued Operations, including Gain on Disposal, related to SAESA for the years ended December 31, 2008, 2007, and 2006 was $217 million, $(34) million and $57 million, respectively.

¡ ***Bioenergie***

In November 2008, we sold our ownership interest in Bioenergie. Income from Discontinued Operations, including Loss on Disposal, related to Bioenergie for the years ended December 31, 2008, 2007, and 2006 was $(12) million, $(6) million and $6 million respectively.

See Note 3. Discontinued Operations, Dispositions and Impairments for additional information.

### For the year ended December 31, 2007 as compared to 2006

**Operating Revenues** decreased $136 million, primarily due to

- $114 million in lower generation revenues at our Texas plants, primarily due to

|  |  |
| --- | --- |
| ¡ | $80 million of lower electricity sales, resulting from forced outages at both facilities, and |
| ¡ | $42 million in lower unrealized MTM gains on electricity, largely driven by strengthening of forward curves for 2007, |
| ¡ | partially offset by an $8 million increase in electricity prices, and |

- $17 million in reduced leveraged lease revenue due primarily to the effect of adopting FIN 48 and FSP13-2.

### Operating Expenses

***Energy Costs*** decreased $76 million primarily due to lower generation at our Texas plants

|  |  |
| --- | --- |
| ¡ | including $42 million in lower fuel consumption, |
| ¡ | $22 million in reduced MTM costs on gas purchases driven by improvement of future spark spreads for 2007 and beyond, and |
| ¡ | an $8 million reduction in purchased power costs. |

- ***Operation and Maintenance*** experienced no material change.
- ***Depreciation and Amortization*** experienced no material change.

**Gain (Loss) on Sale and Impairment of Equity Method Investments** increased $409 million primarily due to

- the absence of $263 million pre-tax loss on the sale of RGE in 2006, and
- $153 million pre-tax gain on the sale of equity investments in 2007,
- partially offset by $9 million in higher write-down of investments in PPN and Turboven.

**Other Income and Deductions** decreased $40 million primarily due to

- $35 million loss on the early retirement of debt resulting from the redemption of Energy Holdings’ Senior Notes in 2007, and
- $9 million in lower interest income from our parent due to lower average intercompany debt balances.

**Interest Expense** decreased $32 million due to

- $22 million in lower interest expense on senior notes at Energy Holdings due to redemptions, and
- lower interest expense due to lower non-recourse debt balances.

**Income Tax Expense** increased $247 million due primarily to

- $163 million of taxes recorded in 2007 as a result of the sale of Chilquinta and LDS, and
- the absence of the $93 million tax benefit obtained in 2006 on the impairment of RGE.

### LIQUIDITY AND CAPITAL RESOURCES

The following discussion of our liquidity and capital resources is on a consolidated basis, noting the uses and contributions, where material, of our three direct operating subsidiaries.

### Financing Methodology

Our capital requirements are met through internally generated cash flows and external financings, consisting of short-term debt for liquidity purposes and long-term debt and equity for capital investments.

PSE&G’s sources of external liquidity include a $600 million multi-year syndicated credit facility as well as bilateral credit agreements. PSE&G’s commercial paper program, which is sized at $600 million, is the primary vehicle for meeting its short-term funding needs. This program provides liquidity to meet seasonal, intra-month and temporary working capital needs. PSE&G does not engage in any intercompany borrowing or lending with PSEG or any other affiliate. PSE&G’s dividend payments to PSEG are consistent with its capital structure objectives which have been established to achieve solid investment grade credit ratings. PSE&G’s long-term financing plan is designed to replace maturities, fund a portion of its capital program and manage short-term debt balances. Generally, PSE&G uses either secured medium-term notes or first mortgage bonds to raise long-term capital which it believes will provide the lowest cost of financing and most consistent access to capital markets.

PSEG, Power, Energy Holdings and Services participate in a corporate money pool, an aggregation of daily cash balances designed to efficiently manage their respective short term liquidity needs. Energy Holdings has historically lent to the money pool; its primary source of liquidity is its invested balance with PSEG and a $136 million credit facility. PSEG’s sources of external liquidity include a $1.0 billion multi-year syndicated credit facility as well as bilateral credit agreements. These facilities are available to back-stop PSEG’s $1.0 billion commercial paper program, issue letters of credit, and for general corporate purposes. These facilities may also be used to provide support to Power for the issuance of letters of credit. PSEG’s credit facilities and the $1 billion commercial paper program are available to support PSEG working capital needs or to temporarily fund growth opportunities in advance of obtaining permanent financing. From time to time, PSEG may make equity contributions or provide credit support to its subsidiaries.

Power’s sources of external liquidity include a $1.6 billion syndicated multi-year credit facility. Additionally, from time to time, Power maintains bilateral credit agreements designed to enhance its liquidity position. Credit capacity is primarily used to provide collateral in support of hedging activities and to meet potential collateral postings in the event of a credit rating downgrade below investment grade. Power’s dividends payments to the parent are also designed to be consistent with its capital structure objectives which have been established to achieve solid investment grade credit ratings and provide sufficient financial flexibility. Generally, Power issues either retail medium-term notes or senior unsecured debt to raise long-term capital.

### Operating Cash Flows

Our operating cash flows combined with cash on hand and financing activities are expected to be sufficient to fund capital expenditures and shareholder dividend payments, with excess cash available to invest in the business, reduce debt and/or repurchase common stock.

For the year ended December 31, 2008, our operating cash flow increased by $424 million as compared to 2007. For the year ended December 31, 2007, our operating cash flow decreased by $5 million as compared to 2006. The net changes were due to net changes from our subsidiaries as discussed below.

### Power

Power’s operating cash flow increased $481 million from $1,205 million to $1,686 million for the year ended December 31, 2008, as compared to 2007, primarily resulting from an increase of $400 million in net cash collateral receipts, an increase of $121 million from net collections of counterparty receivables and an increase in net income of $109 million, partially offset by a decrease of $197 million due to higher gas and coal inventory prices and a buildup of coal inventory at the end of 2008.

Power’s operating cash flow increased $162 million for the year ended December 31, 2007 as compared to 2006, due principally to an increase in net income of $457 million, net of the Loss on Disposal of Lawrenceburg of $208 million, partially offset by an increase of $322 million in margin receivables related to higher collateral requirements.

### PSE&G

PSE&G’s operating cash flow increased $235 million from $678 million to $913 million for the year ended December 31, 2008, as compared to 2007, primarily due to increases of $164 million in deferred income taxes due to bonus depreciation and increased planned 2009 pension contributions; $199 million in collections of customer receivables offset by decreases of $122 million in accounts payable due primarily to lower electric and gas payables; and $39 million in higher 2008 pension fund contributions.

The December 2008 accounts receivable balance was slightly higher than the previous year while December 2007 had increased dramatically in comparison to the prior year when there was unusually mild weather in December 2006. The impact was higher cash flow from receivables in 2008. PSE&G anticipates lower cash collections from customers resulting in higher accounts receivable balances in 2009 due to current economic conditions.

PSE&G’s operating cash flow decreased $128 million for the year ended December 31, 2007, as compared to 2006, primarily due to a decline in cash from working capital. The operating cash flow for the year 2006 was $806 million primarily due to very cold weather at the end of 2005 which resulted in increased cash flow during 2006. The return of more normal weather conditions in 2007 caused operating cash flow to decline to the 2005 level.

### Energy Holdings

Energy Holdings’ operating cash flow decreased $381 million from $71 million to $(310) million for the year ended December 31, 2008, as compared to 2007. The decrease was mainly attributable to increased tax payments in 2008.

Energy Holdings’ operating cash flow decreased $83 million for the year ended December 31, 2007, as compared to 2006. The decrease was mainly due to a $100 million tax deposit made with the IRS in the fourth quarter of 2007 and the timing of tax payments related to the sales of Elcho, Skawina and RGE in 2006.

### Short-Term Liquidity

We have been managing our liquidity to assure that we continue to have sufficient access to cash to operate our businesses in the event the capital markets do not allow for near term financing at reasonable terms. We are also closely monitoring the financial condition and concentration of lenders in our bank facilities. There is no provision in any of the credit facilities that would require other lenders in the facility to assume loan commitments of any financial institution that fails to meet its loan commitments. No single institution is committing more than 9% of the total.

We continually monitor our liquidity and seek to add capacity as needed to meet our liquidity requirements. During 2008, PSEG, Power and PSE&G added capacity of $147 million, $225 million and $28 million, respectively. Each of our credit facilities is restricted as to availability and use to the specific companies as listed below; however, if necessary, the PSEG facilities can also be used to support Power’s liquidity needs. Our total credit facilities and available liquidity as of December 31, 2008 were as follows:

| Company/Facility | Total Facility Usage Millions | As of December 31, 2008 Available Liquidity |  |
| --- | ---: | ---: | ---: |
| PSEG | $1,100 | $13 | $1,087 |
| Power | 2,000 | 288 | 1,712 |
| PSE&G | 600 | 20 | 580 |
| Energy Holdings | 136 | 21 | 115 |
| **Total** | **$3,836** | **$342** | **$3,494** |

During 2009, $400 million of bilateral credit facilities at PSEG and Power are scheduled to expire. While we expect to request renewal of each of these facilities, no assurances can be given that such facilities will be renewed or renewed on reasonable terms.

For additional information on the specific credit facilities, see Note 12. Schedule of Consolidated Debt.

### Long-Term Debt Financing

PSEG, Power and PSE&G have $249 million, $250 million and $60 million, respectively, of debt maturities upcoming in 2009, excluding securitized and non-recourse debt. These maturities will occur during the second quarter of 2009 for Power and PSE&G and during the third and fourth quarters for PSEG. In February 2009, Energy Holdings issued a par call notice for the early redemption of its remaining $280 million outstanding non-recourse project debt associated with its Texas assets. The debt, which is due on December 31, 2009, is expected to be redeemed by the end of February 2009. We believe that we will be able to refinance or retire these obligations given our current financial position and demonstrated continued access to the capital markets.

For a discussion of our long-term debt transactions during 2008 and into 2009, see Note 12. Schedule of Consolidated Debt.

### Debt Covenants

Our credit agreements may contain maximum debt to equity ratios, minimum cash flow tests and other restrictive covenants and conditions to borrowing. We are currently in compliance with all of our debt covenants. Continued compliance with applicable financial covenants will depend upon our future financial position, level of earnings and cash flows, as to which no assurances can be given.

In addition, under its First and Refunding Mortgage (Mortgage), PSE&G may issue new First and Refunding Mortgage Bonds against previous additions and improvements, provided that its ratio of earnings to fixed charges calculated in accordance with its Mortgage is at least 2 to 1, and/or against retired Mortgage Bonds. As of December 31, 2008, PSE&G’s Mortgage coverage ratio was 4.1 to 1 and the Mortgage would permit up to approximately $2.2 billion aggregate principal amount of new Mortgage Bonds to be issued against additions and improvements to its property.

### Default Provisions

Our bank credit agreements and indentures contain various default provisions that could result in the potential acceleration of payment under the defaulting company’s agreement. We have not defaulted under these agreements.

PSEG’s bank credit agreement and note purchase agreements related to private placement of debt contain cross default provisions under which events at Power or PSE&G, including payment defaults, bankruptcy events, the failure to satisfy certain final judgments or other events of default under their financing agreements, would each constitute an event of default under PSEG’s agreements. Under the note purchase agreements, it is also an event of default if Power or PSE&G ceases to be wholly-owned by PSEG. Under the bank credit agreement, both Power and PSE&G would have to cease to be wholly-owned by PSEG before an event of default would occur.

There are no cross default provisions to affiliates in Power’s or PSE&G’s credit agreements or indentures.

### Ratings Triggers

Our debt indentures and credit agreements do not contain any material ‘ratings triggers’ that would cause an acceleration of the required interest and principal payments in the event of a ratings downgrade. However, in the event of a downgrade, any one or more of the affected companies may be subject to increased interest costs on certain bank debt and certain collateral requirements.

Fluctuations in commodity prices or a deterioration of Power’s credit rating to below investment grade could increase Power’s required margin postings under various agreements entered into in the normal course of business. Power believes it has sufficient liquidity to meet the required posting of collateral which would likely result from a credit rating downgrade at today’s market prices. See Note 11. Commitments and Contingent Liabilities for further information.

In accordance with BPU requirements under the BGS contracts, PSE&G is required to maintain an investment grade credit rating. If PSE&G were to lose its investment grade rating, it would be required to file a plan to assure continued payment for the BGS requirements of its customers.

PSE&G is the servicer for the bonds issued by PSE&G Transition Funding LLC and PSE&G Transition Funding II LLC. If PSE&G were to lose its investment grade rating, PSE&G would be required to remit collected cash daily to the bond trustee. Currently, cash is remitted monthly.

### Common Stock Dividends and Repurchases

Dividend payments on common stock for the year ended December 31, 2008 were $1.29 per share and totaled $655 million. Dividend payments on common stock for the year ended December 31, 2007 were $1.17 per share and totaled $594 million.

In July 2008, our Board of Directors authorized the repurchase of up to $750 million of our common stock to be executed over 18 months beginning August 1, 2008. We are not obligated to acquire any specific number of shares and may suspend or terminate share repurchases at any time. We repurchased 2,382,200 shares of our common stock for $92 million under this authorization through September 30, 2008. No repurchases have been made since that date.

On February 17, 2009, our Board of Directors also approved a $0.01 increase in our quarterly common stock dividend, from $0.3225 to $0.3325 per share for the first quarter of 2009. This reflects an indicated annual dividend rate of $1.33 per share. We expect to continue to pay cash dividends on our common stock; however, the declaration and payment of future dividends to holders of our common stock will be at the discretion of the Board of Directors and will depend upon many factors, including our financial condition, earnings, capital requirements of our business, alternate investment opportunities, legal requirements, regulatory constraints, industry practice and other factors that the Board of Directors deems relevant.

### Credit Ratings

If the rating agencies lower or withdraw our credit ratings, such revisions may adversely affect the market price of our securities and serve to materially increase our cost of capital and limit access to capital. Outlooks assigned to ratings are as follows: stable, negative (Neg) or positive (Pos). There is no assurance that the ratings will continue for any given period of time or that they will not be revised by the rating agencies, if, in their respective judgments, circumstances warrant. Each rating given by an agency should be evaluated independently of the other agencies’ ratings. The ratings should not be construed as an indication to buy, hold or sell any security. In June 2008, Moody’s affirmed the rating of Energy Holdings and changed the ratings outlook to Stable from Negative. In July 2008, Moody’s affirmed the ratings of PSEG and PSE&G and changed the ratings outlook of both companies to Stable from Negative. The rating and outlook of Power remained unchanged.

|  | Moody’s(A) | S&P(B) | Fitch(C) |
| --- | --- | --- | --- |
| **PSEG:** |  |  |  |
| Outlook | **Stable** | **Stable** | **Stable** |
| Commercial Paper | P2 | A2 | F2 |
| **Power:** |  |  |  |
| Outlook | **Stable** | **Stable** | **Stable** |
| Senior Notes | Baa1 | BBB | BBB+ |
| **PSE&G:** |  |  |  |
| Outlook | **Stable** | **Stable** | **Stable** |
| Mortgage Bonds | A3 | A– | A |
| Preferred Securities | Baa3 | BB+ | BBB+ |
| Commercial Paper | P2 | A2 | F2 |

(A) Moody’s ratings range from Aaa (highest) to C (lowest) for long-term securities and P1 (highest) to NP (lowest) for short-term securities.

(B) S&P ratings range from AAA (highest) to D (lowest) for long-term securities and A1 (highest) to D (lowest) for short-term securities.

(C) Fitch ratings range from AAA (highest) to D (lowest) for long-term securities and F1 (highest) to D (lowest) for short-term securities.

68

### Other Comprehensive Income

For the year ended December 31, 2008, we had Other Comprehensive Income of $39 million on a consolidated basis. Other Comprehensive Income was primarily due to $429 million of unrealized gains on derivative contracts accounted for as hedges, substantially offset by $79 million of unrealized losses related to the NDT Funds, a $205 million increase in our consolidated liability for pension and postretirement benefits and $106 million of losses from foreign currency translation adjustments.

### CAPITAL REQUIREMENTS

It is expected that the majority of our capital requirements over the next three years will come from internally generated funds. Projected construction and investment expenditures, excluding nuclear fuel purchases, for the next three years are presented in the table below. These amounts are subject to change, based on various factors.

| Power: | 2009 Millions | 2010 | 2011 |
| --- | ---: | ---: | ---: |
| Hudson Environmental | $305 | $214 | $5 |
| Mercer Environmental | 101 | 11 | 1 |
| Other Environmental | 67 | 32 | 13 |
| Exploration of New Nuclear Plant | 11 | 14 | 9 |
| Other, including Growth Opportunities | 209 | 334 | 341 |
| **Total Power** | **$693** | **$605** | **$369** |
| **PSE&G:** |  |  |  |
| Transmission |  |  |  |
| Reliability Enhancements | $211 | $391 | $587 |
| Facility Replacement | 81 | 95 | 117 |
| Environmental/Regulatory | 4 | 5 | 1 |
| Support | 1 | 1 | 1 |
| Distribution |  |  |  |
| Support Facilities | 39 | 59 | 56 |
| New Business | 159 | 147 | 154 |
| Reliability Enhancements | 78 | 153 | 109 |
| Facility Replacement | 155 | 152 | 155 |
| Environmental/Regulatory | 114 | 108 | 57 |
| **Total PSE&G** | **$842** | **$1,111** | **$1,237** |
| **Other** | **72** | **128** | **158** |
| **Total PSEG** | **$1,607** | **$1,844** | **$1,764** |

### Power

Power’s projected expenditures for the various items listed above are primarily comprised of the following:

- Hudson Environmental—construction of pollution control equipment, including a selective catalytic reduction system, a scrubber, and a baghouse at our Hudson facility.
- Mercer Environmental—construction of pollution control equipment, including scrubbers, at our Mercer facility.
- Other Environmental—construction of other pollution control equipment, including scrubbers at our Keystone facility.

69

- Exploration of New Nuclear Plant—costs associated with exploring the feasibility of, and the technologies involved with, building a new nuclear plant.
- Other, including Growth Opportunities—costs associated with potential opportunities to build other new plants, such as peaking facilities, and various capital projects at existing facilities to either extend plants’ useful lives or increase operating output.

In 2008, Power made $822 million of capital expenditures (excluding $150 million for nuclear fuel), primarily related to the Salem steam generator replacement, the Hope Creek uprate, upgrades at Hudson and the baghouse installation at Mercer.

### PSE&G

PSE&G’s projections for future capital expenditures include additions and replacements to its transmission and distribution systems to meet expected growth and to manage reliability. As project scope and cost estimates develop, PSE&G will modify its current projections to include these required investments. PSE&G’s projected expenditures for the various items reported above are primarily comprised of the following:

- Support Facilities—ancillary equipment needed to support the business lines, such as computers, office furniture, and buildings and structures housing support personnel or equipment/inventory.
- New Business—investments made in support of new business to PSE&G (e.g. add new customers).
- Reliability Enhancements—investments made to improve the reliability and efficiency of the system or function.
- Facility Replacement—investments made to replace systems or equipment in kind.
- Environmental/Regulatory—investments made in response to regulatory or legal mandates where financial loss is imminent if not pursued.

In 2008, PSE&G made $761 million of capital expenditures, primarily for transmission and distribution system reliability. This does not include $44 million spent on cost of removal.

### Disclosures about Long-Term Maturities, Contractual and Commercial Obligations and Certain Investments

The following table reflects our contractual cash obligations and other commercial commitments in the respective periods in which they are due. See Note 11. Commitments and Contingent Liabilities for a discussion of contractual commitments for a variety of services for which annual amounts are not quantifiable. In addition, the table summarizes anticipated recourse and non-recourse debt maturities for the years shown. The table does not reflect debt maturities of Energy Holdings’ non-consolidated investments. If those obligations were not able to be refinanced by the project, Energy Holdings may elect to make additional contributions in these investments. For additional information, see Note 12. Schedule of Consolidated Debt. The table below does not reflect any anticipated cash payments for pension obligations due to uncertain timing of payments or liabilities under FIN 48 since we are unable to reasonably estimate the timing of FIN 48 liability payments in individual years beyond 12 months due to uncertainties in the timing of the effective settlement of tax positions. See Note 18. Income Taxes for additional information.

| Contractual Cash Obligations Short-Term Debt Maturities | Total Amount Committed Millions | Less Than 1 year | 2-3 years | 4-5 years | Over 5 years |
| --- | ---: | ---: | ---: | ---: | ---: |
| PSEG | $— | $— | $— | $— | $— |
| PSE&G | 19 | 19 | — | — | — |
| **Long-Term Recourse Debt Maturities** |  |  |  |  |  |
| PSEG | 249 | 249 | — | — | — |
| Power | 2,908 | 250 | 800 | 666 | 1,192 |
| PSE&G | 3,531 | 60 | 300 | 1,025 | 2,146 |
| Transition Funding (PSE&G) | 1,454 | 178 | 381 | 418 | 477 |
| Transition Funding II (PSE&G) | 76 | 10 | 22 | 24 | 20 |
| Energy Holdings | 505 | — | 505 | — | — |
| **Long-Term Non-Recourse Project Financing** |  |  |  |  |  |
| Energy Holdings | 328 | 286 | 26 | 7 | 9 |
| **Interest on Recourse Debt** |  |  |  |  |  |
| PSEG | 13 | 13 | — | — | — |
| Power | 1,659 | 191 | 342 | 181 | 945 |
| PSE&G | 2,494 | 190 | 360 | 339 | 1,605 |
| Transition Funding (PSE&G) | 379 | 93 | 150 | 98 | 38 |
| Transition Funding II (PSE&G) | 12 | 3 | 5 | 3 | 1 |
| Energy Holdings | 107 | 43 | 64 | — | — |
| **Interest on Non-Recourse Project Financing** |  |  |  |  |  |
| Energy Holdings | 31 | 24 | 4 | 2 | 1 |
| **Capital Lease Obligations** |  |  |  |  |  |
| PSEG | 49 | 7 | 14 | 15 | 13 |
| Power | 11 | 1 | 3 | 4 | 3 |
| Energy Holdings | — | — | — | — | — |
| **Operating Leases** | — |  |  |  |  |
| Power | 39 | 39 | — | — | — |
| PSE&G | 14 | 4 | 6 | 2 | 2 |
| Energy Holdings | 2 | 1 | 1 | — | — |
| **Energy-Related Purchase Commitments** |  |  |  |  |  |
| Power | 3,173 | 972 | 1,292 | 536 | 373 |
| Energy Holdings | 94 | 94 | — | — | — |
| **Total Contractual Cash Obligations** | **$17,147** | **$2,727** | **$4,275** | **$3,320** | **$6,825** |
| **Commercial Commitments** |  |  |  |  |  |
| **Standby Letters of Credit** |  |  |  |  |  |
| Power | $302 | $302 | $— | $— | $— |
| Energy Holdings | 20 | 20 | — | — | — |
| **Guarantees and Equity Commitments** |  |  |  |  |  |
| Energy Holdings | 8 | 6 | 2 | — | — |
| **Total Commercial Commitments** | **$330** | **$328** | **$2** | **$—** | **$—** |
| **Liability Payments Under FIN 48** |  |  |  |  |  |
| PSEG | $46 | $46 | $— | $— | $— |
| Energy Holdings | 21 | 21 | — | — | — |

71

### OFF-BALANCE SHEET ARRANGEMENTS

### Power

Power issues guarantees in conjunction with certain of its energy contracts. See Note 11. Commitments and Contingent Liabilities for further discussion.

### Energy Holdings

We have certain investments that are accounted for under the equity method in accordance with accounting principles generally accepted in the United States (GAAP). Accordingly, amounts recorded in the Consolidated Balance Sheets for such investments represent our equity investment, which is increased for our pro-rata share of earnings less any dividend distribution from such investments. The companies in which we invest that are accounted for under the equity method have an aggregate $154 million of debt on their combined, Consolidated Balance Sheets. Our pro-rata share of such debt is $81 million. This debt is non-recourse to us. We are generally not required to support the debt service obligations of these companies. However, default with respect to this non-recourse debt could result in a loss of invested equity.

Energy Holdings has investments in leveraged leases that are accounted for in accordance with SFAS No. 13, “Accounting for Leases.” Leveraged lease investments generally involve three parties: an owner/lessor, a creditor and a lessee. In a typical leveraged lease financing, the lessor purchases an asset to be leased. The purchase price is typically financed 80% with debt provided by the creditor and the balance comes from equity funds provided by the lessor. The creditor provides long-term financing to the transaction secured by the property subject to the lease. Such long-term financing is non-recourse to the lessor and is not presented on our Consolidated Balance Sheets. In the event of default, the leased asset, and in some cases the lessee, secure the loan. As a lessor, Energy Holdings has ownership rights to the property and rents the property to the lessees for use in their business operation. For additional information, see Note 6. Long-Term Investments.

In the event that collectibility of the minimum lease payments to be received by Energy Holdings is no longer reasonably assured, the accounting treatment for some of the leases may change. In such cases, Energy Holdings may deem that a lessee has a high probability of defaulting on the lease obligation, and would reclassify the lease from a leveraged lease to an operating lease and would consider the need to record an impairment of its investment. Should Energy Holdings ever directly assume a debt obligation, the fair value of the underlying asset and the associated debt would be recorded on the Consolidated Balance Sheets instead of the net equity investment in the lease.

### CRITICAL ACCOUNTING ESTIMATES

Under GAAP, many accounting standards require the use of estimates, variable inputs and assumptions (collectively referred to as estimates) that are subjective in nature. Because of this, differences between the actual measure realized versus the estimate can have a material impact on results of operations, financial position and cash flows. We have determined that the following estimates are considered critical to the application of rules that relate to the respective businesses.

### Accounting for Pensions

We account for pensions under SFAS No. 87, “Employers’ Accounting for Pensions” (SFAS 87). Pension costs under SFAS 87 are calculated using various economic and demographic assumptions. Economic assumptions include the discount rate and the long-term rate of return on trust assets. Demographic assumptions include projections of future mortality rates, pay increases and retirement patterns.

| Assumption | 2009 | 2008 | 2007 |
| --- | ---: | ---: | ---: |
| Discount Rate | 6.80% | 6.50% | 6.00% |
| Rate of Return on Plan Assets | 8.75% | 8.75% | 8.75% |

72

Our discount rate assumption, which is determined annually, is based on the rates of return on high-quality fixed-income investments currently available and expected to be available during the period to maturity of the pension benefits. The discount rate used to calculate pension obligations is determined as of December 31 each year, our SFAS 87 measurement date. The discount rate used to determine year-end obligations is also used to develop the following year’s net periodic pension cost.

Our expected rate of return on plan assets reflects current asset allocations, historical long-term investment performance and an estimate of future long-term returns by asset class and long-term inflation assumptions.

Based on the above assumptions, we have estimated net periodic pension expense of approximately $162 million, net of amounts capitalized, and contributions of up to $275 million in 2009. As part of the business planning process, we have modeled future costs assuming an 8.75% rate of return and a 6.80% discount rate for 2010 and beyond. Actual future pension expense and funding levels will depend on future investment performance, changes in discount rates, market conditions, funding levels relative to our projected benefit obligation and accumulated benefit obligation and various other factors related to the populations participating in the pension plans.

The following chart reflects the sensitivities associated with a change in certain assumptions. The effects of the assumption changes shown below solely reflect the impact of that specific assumption.

| Assumption | 2009 | Change | As of 12/31/2008 Impact on Pension Benefit Obligation Millions | Increase to Pension Expense in 2009 |
| --- | ---: | ---: | ---: | ---: |
| Discount Rate | 6.80% | -1% | $444 | $42 |
| Rate of Return on Plan Assets | 8.75% | -1% | $— | $25 |

### Accounting for Deferred Taxes

We provide for income taxes based on the liability method required by SFAS No. 109, “Accounting for Income Taxes” (SFAS 109). Under this method, deferred tax assets and liabilities are recognized for the future tax consequences attributable to differences between the financial statement carrying amounts of existing assets and liabilities and their respective tax basis, as well as net operating loss and credit carryforwards.

We evaluate the need for a valuation allowance against respective deferred tax assets based on the likelihood of expected future taxable income. We do not believe a valuation allowance is necessary; however, if the expected level of future taxable income changes or certain tax planning strategies become unavailable, we would record a valuation allowance through income tax expense in the period the valuation allowance is deemed necessary. Our subsidiaries’ ability to realize their deferred tax assets are dependent on other subsidiaries’ ability to generate ordinary income and capital gains.

### Uncertain Tax Positions

We are required to make judgments regarding the potential tax effects of various financial transactions and results of operations in order to estimate our obligations to taxing authorities. Beginning January 1, 2007, we began accounting for uncertain income tax positions using a benefit recognition model with a two-step approach, a more-likely-than-not recognition criterion and a measurement attribute that measures the position as the largest amount of tax benefit that is greater than 50% likely of being realized upon ultimate settlement in accordance with FIN 48. If it is not more likely than not that the benefit will be sustained on its technical merits, no benefit will be recorded. Uncertain tax positions that relate only to timing of when an item is included on a tax return are considered to have met the recognition threshold. Prior to January 1, 2007, we estimated our uncertain income tax obligations in accordance with SFAS 109 and SFAS No. 5, “Accounting for Contingencies” (SFAS No. 5). We also have non-income tax obligations related to real estate, sales and use and employment-related taxes and ongoing appeals related to these tax matters that are outside the scope of FIN 48 and accounted for under SFAS No. 5.

Accounting for tax obligations requires judgments, including estimating reserves for potential adverse outcomes regarding tax positions that have been taken. We also assess our ability to utilize tax attributes, including those in the form of carryforwards, for which the benefits have already been reflected in the financial statements. We do not record valuation allowances for deferred tax assets related to capital losses that we believe will be realized in future periods. While we believe the resulting tax reserve balances as of December 31, 2008 are appropriately accounted for in accordance with FIN 48, SFAS No. 5 and SFAS No. 109, as applicable, the ultimate outcome of such matters could result in favorable or unfavorable adjustments to our consolidated financial statements and such adjustments could be material.

### Hedge and MTM Accounting

SFAS No. 133, “Accounting for Derivative Instruments and Hedging Activities” (SFAS 133) requires an entity to recognize the fair value of derivative instruments held as assets or liabilities on the balance sheet. SFAS 133 applies to all derivative instruments that we hold. The fair value of most derivative instruments is determined by reference to quoted market prices, listed contracts, or quotations from brokers. Some of these derivative contracts are long-term and rely on forward price quotations over the entire duration of the derivative contracts.

In the absence of the pricing sources listed above, for a small number of contracts, we utilize mathematical models that rely on historical data to develop forward pricing information in the determination of fair value. Because the determination of fair value using such models is subject to significant assumptions and estimates, we developed reserve policies that are consistently applied to model-generated results to determine reasonable estimates of value to record in the financial statements.

We have entered into various derivative instruments to hedge exposure to commodity price risk and interest rate risk. Many such instruments have been designated as cash flow hedges. For a cash flow hedge, the change in the value of a derivative instrument is measured against the offsetting change in the value of the underlying contract, anticipated transaction or other business condition that the derivative instrument is intended to hedge. This is known as the measure of derivative effectiveness. In accordance with SFAS 133, the effective portion of the change in the fair value of a derivative instrument designated as a cash flow hedge is reported in Accumulated Other Comprehensive Loss, net of tax, or as a Regulatory Asset (Liability). Amounts in Accumulated Other Comprehensive Loss are ultimately recognized in earnings when the related hedged forecasted transaction occurs. During periods of extreme price volatility, there will be significant changes in the value recorded in Accumulated Other Comprehensive Loss. The changes in the fair value of the ineffective portions of derivative instruments designated as cash flow hedges are recorded in earnings.

For our wholesale energy business, many of the forward sale, forward purchase, option and other contracts are derivative instruments that hedge commodity price risk, but for which the business is not able to meet the hedge accounting requirements in SFAS 133. The changes in value of such derivative contracts are marked to market through earnings as the related commodity prices fluctuate. As a result, our earnings may experience significant fluctuations depending on the volatility of commodity prices.

For additional information regarding Derivative Financial Instruments, see Note 14. Financial Risk Management Activities.

### NDT Funds

We account for the assets in the NDT Funds under SFAS No. 115, “Accounting for Certain Investments in Debt and Equity Securities” (SFAS 115). The assets in the NDT Funds are classified as available-for-sale securities and are marked to market with unrealized gains and losses recorded in Accumulated Other Comprehensive Loss unless securities with such unrealized losses are deemed to be other-than-temporarily-impaired. Realized gains, losses and dividend and interest income are recorded in our Statements of Operations as Other Income and Other Deductions. Unrealized losses that are deemed to be other-than-temporarily-impaired, as defined under SFAS 115, and related interpretive guidance, are charged against earnings rather than Accumulated Other Comprehensive Loss.

### Unbilled Revenues

Electric and gas revenues are recorded based on services rendered to customers during each accounting period. We record unbilled revenues for the estimated amount customers will be billed for services rendered from the time meters were last read to the end of the respective accounting period. Unbilled usage is calculated in two steps. The initial step is to apply a base usage per day to the number of unbilled days in the period. The second step estimates seasonal loads based upon the time of year and the variance of actual degree-days and temperature-humidity-index hours of the unbilled period from expected norms. The resulting usage is priced at current rate levels and recorded as revenue. A calculation of the associated energy cost for the unbilled usage is recorded as well. Each month, the prior month’s unbilled amounts are reversed and the current month’s amounts are accrued. The resulting revenue and expense reflect the service rendered in the calendar month. Using benchmarks other than those used in this calculation could have a material effect on the amounts accrued in a reporting period.

### SFAS 71

PSE&G prepares its Consolidated Financial Statements in accordance with the provisions of SFAS 71, which differs in certain respects from the application of GAAP by non-regulated businesses. In general, SFAS 71 recognizes that accounting for rate-regulated enterprises should reflect the economic effects of regulation. As a result, a regulated utility is required to defer the recognition of costs (a Regulatory Asset) or recognize obligations (a Regulatory Liability) if it is probable that, through the rate-making process, there will be a corresponding increase or decrease in future rates. Accordingly, PSE&G has deferred certain costs, which will be amortized over various future periods. To the extent that collection of such costs or payment of liabilities is no longer probable as a result of changes in regulation and/or PSE&G’s competitive position, the associated Regulatory Asset or Liability is charged or credited to income. See Note 5. Regulatory Assets and Liabilities for additional information related to these and other regulatory issues.

## Market risk

As filed, 12,988 characters.

### MARKET RISK

The market risk inherent in our market-risk sensitive instruments and positions is the potential loss arising from adverse changes in commodity prices, equity security prices and interest rates as discussed in the Notes to Consolidated Financial Statements. It is our policy to use derivatives to manage risk consistent with business plans and prudent practices. We have a Risk Management Committee comprised of our executive officers who utilize a risk oversight function to ensure compliance with our corporate policies and risk management practices.

Additionally, we are exposed to counterparty credit losses in the event of non-performance or non-payment. We have a credit management process, which is used to assess, monitor and mitigate counterparty exposure. In the event of non-performance or non-payment by a major counterparty, there may be a material adverse impact on our financial condition, results of operations or net cash flows.

### Commodity Contracts

The availability and price of energy-related commodities are subject to fluctuations from factors such as weather, environmental policies, changes in supply and demand, state and federal regulatory policies, market rules and other events. To reduce price risk caused by market fluctuations, we enter into supply contracts and derivative contracts, including forwards, futures, swaps and options with approved counterparties. These contracts, in conjunction with demand obligations, help reduce risk and optimize the value of owned electric generation capacity.

### Value-at-Risk (VaR) Models

We use VaR models to assess the market risk of our commodity businesses. The portfolio VaR model includes our owned generation and physical contracts, as well as fixed price sales requirements, load requirements and financial derivative instruments. VaR represents the potential gains or losses, under normal market conditions, for instruments or portfolios due to changes in market factors, for a specified time period and confidence level. We estimate VaR across our commodity businesses.

We manage our exposure at the portfolio level, which consists of owned generation, load-serving contracts (both gas and electric), fuel supply contracts and energy derivatives designed to manage the risk around generation and load. While we manage our risk at the portfolio level, we also monitor separately the risk of our trading activities and hedges. Non-trading mark-to-market (MTM) VaR consists of MTM derivatives that are economic hedges, some of which qualify for hedge accounting. The MTM derivatives that are not hedges are included in the trading VaR.

The VaR models used are variance/covariance models adjusted for the delta of positions with a 95% one-tailed confidence level and a one-day holding period for the MTM trading and non-trading activities and a 95% one-tailed confidence level with a one-week holding period for the portfolio VaR. The models assume no new positions throughout the holding periods, however, we actively manage our portfolio.

Increased trading activities during 2008 have led to a higher VaR as compared to December 31, 2007. As of December 31, 2008, VaR was $1 million. As of December 31, 2007, trading VaR was less than $1 million.

| For the Year Ended December 31, 2008 95% Confidence Level, One-Day Holding Period, One-Tailed: | Trading VaR Millions |  | Non-Trading MTM VaR |
| --- | ---: | --- | ---: |
| Period End | $1 |  | $44 |
| Average for the Period | $1 |  | $56 |
| High | $1 |  | $71 |
| Low | $— | \* | $43 |
| 99% Confidence Level, One-Day Holding Period, Two-Tailed: |  |  |  |
| Period End | $1 |  | $69 |
| Average for the Period | $1 |  | $88 |
| High | $2 |  | $111 |
| Low | $— | \* | $67 |

\* less than $1 million

### Interest Rates

We are subject to the risk of fluctuating interest rates in the normal course of business. It is our policy to manage interest rate risk through the use of fixed and floating rate debt, interest rate swaps and interest rate lock agreements. We manage our respective interest rate exposures by maintaining a targeted ratio of fixed and floating rate debt.

As of December 31, 2008, a hypothetical 10% increase in market interest rates would result in

- $2 million of additional annual interest costs related to both the current and long-term portion of long-term debt, and
- a $253 million decrease in the fair value of debt, including a $132 million decrease at PSE&G and a $92 million decrease at Power.

### Debt and Equity Securities

We have $2.4 billion invested in our pension plans. Although fluctuations in market prices of securities within this portfolio do not directly affect our earnings in the current period, changes in the value of these investments could affect

- our future contributions to these plans,
- our financial position if our accumulated benefit obligation under our pension plans exceeds the fair value of the pension funds, and
- future earnings, as we could be required to adjust pension expense and the assumed rate of return.

The NDT Funds are comprised of both fixed income and equity securities totaling $970 million as of December 31, 2008. The fair value of equity securities is determined independently each month by the Trustee. As of December 31, 2008, the portfolio was comprised of $413 million of equity securities and $557 million in fixed income securities. The fair market value of the assets in the NDT Funds will fluctuate primarily depending upon the performance of equity markets. As of December 31, 2008, a hypothetical 10% change in the equity market would impact the value of the equity securities in the NDT Funds by approximately $41 million.

We use duration to measure the interest rate sensitivity of the fixed income portfolio. Duration is a summary statistic of the effective average maturity of the fixed income portfolio. The benchmark for the fixed income component of the NDT Funds currently has a duration of 3.71 years and a yield of 3.99%. The portfolio’s value will appreciate or depreciate by the duration with a 1% change in interest rates. As of December 31, 2008, a hypothetical 1% increase in interest rates would result in a decline in the market value for the fixed income portfolio of approximately $18 million.

### Credit Risk

Credit risk relates to the risk of loss that we would incur as a result of non-performance by counterparties pursuant to the terms of their contractual obligations. We have established credit policies that we believe significantly minimize credit risk. These policies include an evaluation of potential counterparties’ financial condition (including credit rating), collateral requirements under certain circumstances and the use of standardized agreements, which may allow for the netting of positive and negative exposures associated with a single counterparty.

Counterparties expose Power’s operations to credit losses in the event of non-performance or non-payment. We have a credit management process, which is used to assess, monitor and mitigate counterparty exposure for Power and its subsidiaries. Power’s counterparty credit limits are based on a scoring model that considers a variety of factors, including leverage, liquidity, profitability, credit ratings and risk management capabilities. Power has entered into master agreements that allow for payment netting with the majority of its large counterparties, which reduce Power’s exposure to counterparty risk by providing the offset of amounts payable to the counterparty against amounts receivable from the counterparty. In the event of non-performance or non-payment by a major counterparty, there may be a material adverse impact on Power’s financial condition, results of operations or net cash flows. As of December 31, 2008, 81% of the credit exposure (MTM plus net receivables and payables, less cash collateral) for Power’s operations was with investment grade counterparties. The majority of the credit exposure with non-investment grade counterparties was with certain companies that supply fuel (primarily coal) to Power. This exposure relates to the risk of a counterparty performing under its obligations rather than payment risk.

The following table provides information on Power’s credit exposure, net of collateral, as of December 31, 2008. Credit exposure is defined as any positive results of netting accounts receivable/accounts payable and the forward value on open positions. It further delineates that exposure by the credit rating of the counterparties and provides guidance on the concentration of credit risk to individual counterparties and an indication of the maturity of a company’s credit risk by credit rating of the counterparties.

### Schedule of Credit Risk Exposure on Energy Contracts Net

### Assets As of December 31, 2008

### Rating

### Current

### Exposure

### Securities

### Held

### as Collateral

### Net

### Exposure

### Number of

### Counterparties

### \>10%

### Net Exposure

### Counterparties

### \>10%

Millions

Millions

Investment Grade—

External Rating

1,028

280

996

1

(A)

545

Non-Investment Grade—

External Rating

235

235

1

(B)

231

Investment Grade—

No External Rating

14

15

Non-Investment Grade—No External Rating

12

1

11

### Total

### 1,289

### 281

### 1,257

### 2

### 776

(A) PSE&G is a counterparty with net exposure of $545 million.

(B) Credit exposure is with a non-investment grade counterparty that is a coal supplier to Power. Therefore, this exposure relates to the risk of the counterparty’s non-performance under its obligations rather than payment risk.

The net exposure listed above, in some cases, will not be the difference between the current exposure and the collateral held. Counterparty may have posted more cash collateral than the outstanding exposure, in which case there would not be exposure. When letters of credit have been posted as collateral, the exposure amount is not reduced, but the exposure amount is transferred to the rating of the issuing bank. As of December 31, 2008, Power had 140 active counterparties.

BGS suppliers expose PSE&G to credit losses in the event of non-performance or non-payment upon a default of the BGS supplier. Credit requirements are governed under BPU approved BGS contracts.

Energy Holdings has credit risk with respect to its counterparties to power purchase agreements and other parties.

Energy Holdings also has credit risk related to its investments in leveraged leases, totaling $285 million, which is net of deferred taxes of $2 billion, as of December 31, 2008. These investments are largely concentrated in the energy industry. As of December 31, 2008, 58% of counterparties in the lease portfolio was rated investment grade by both S&P and Moody’s. As of December 31, 2008, the weighted average credit rating of the lessees in Holdings’ leasing portfolio was A–/A3 by S&P and Moody’s respectively. The credit exposure to the lessees is partially mitigated through various credit enhancement mechanisms within the lease transactions. These credit enhancement features vary from lease to lease. Some of the leasing transactions include covenants that restrict the flow of dividends from the lessee to its parent, over-collateralization of the lessee with non-leased assets, historical and forward cash flow coverage tests that prohibit discretionary capital expenditures and dividend payments to the parent/lessee if stated minimum coverages are not met and similar cash flow restrictions if ratings are not maintained at stated levels. These covenants are designed to maintain cash reserves in the transaction entity for the benefit of the non-recourse lenders and the lessor/equity participants in the event of a market downturn or degradation in operating performance of the leased assets.

In any lease transaction, in the event of a default, Energy Holdings would exercise its rights and attempt to seek recovery of its investment. The results of such efforts may not be known for a period of time. A bankruptcy of a lessee and failure to recover adequate value could lead to a foreclosure of the lease. Under a worst-case scenario, if a foreclosure were to occur, Energy Holdings would record a pre-tax write-off up to its gross investment, including deferred taxes, in these facilities. Also, in the event of a potential foreclosure, the net tax benefits generated by Energy Holdings’ portfolio of investments could be materially reduced in the period in which gains associated with the potential forgiveness of debt at these projects occurs. The amount and timing of any potential reduction in net tax benefits is dependent upon a number of factors including, but not limited to, the time of a potential foreclosure, the amount of lease debt outstanding, any cash trapped at the projects and negotiations during such potential foreclosure process. The potential loss of earnings, impairment and/or tax payments could have a material impact to our financial position, results of operations and net cash flows.

## Controls and procedures

As filed, 2,990 characters.

### Disclosure Controls and Procedures

PSEG, Power and PSE&G have established and maintain disclosure controls and procedures as defined under Rule 13a-15(e) and 15d-15(e) promulgated under the Securities Exchange Act of 1934, as amended (the “Exchange Act”) that are designed to provide reasonable assurance that information required to be disclosed in the reports that are filed or submitted under the Exchange Act is recorded, processed, summarized and reported and is accumulated and communicated to the Chief Executive Officer and Chief Financial Officer of each respective company, as appropriate, by others within the entities to allow timely decisions regarding required disclosure. We have established a disclosure committee which includes several key management employees and which reports directly to the Chief Financial Officer and Chief Executive Officer of each respective company. The committee monitors and evaluates the effectiveness of these disclosure controls and procedures. The Chief Financial Officer and Chief Executive Officer of each company have evaluated the effectiveness of the disclosure controls and procedures and, based on this evaluation, have concluded that disclosure controls and procedures at each respective company were effective at a reasonable assurance level as of the end of the period covered by the report.

### Internal Controls

### PSEG, Power and PSE&G

We have conducted assessments of our internal control over financial reporting as of December 31, 2008, as required by Section 404 of the Sarbanes-Oxley Act, using the framework promulgated by the Committee of Sponsoring Organizations of the Treadway Commission, commonly referred to as “COSO”. Management’s reports on PSEG’s, Power’s and PSE&G’s internal control over financial reporting is included on pages 180, 181 and 182, respectively. The Independent Registered Public Accounting Firm’s report with respect to the effectiveness of PSEG’s internal control over financial reporting is included on page 183. This annual report does not include an attestation report of the Independent Registered Public Accounting Firm for Power or PSE&G regarding internal control over financial reporting. Management’s report for Power and PSE&G was not subject to attestation by the Independent Registered Public Accounting Firm pursuant to temporary rules of the Securities and Exchange Commission that permit Power and PSE&G to provide only management’s report in this annual report. Management has concluded that internal control over financial reporting is effective as of December 31, 2008.

We continually review our disclosure controls and procedures and make changes, as necessary, to ensure the quality of their financial reporting. There have been no changes in internal control over financial reporting that occurred during the fourth quarter of 2008 that have materially affected, or are reasonably likely to materially affect, each registrant’s internal control over financial reporting.

Filed Feb 26, 2009.