## Management's discussion and analysis

As filed, 75,905 characters.

Management’s Discussion and Analysis of Financial Condition and Results of Operations (“MD&A”) is designed to provide a reader of our financial statements with a narrative from the perspective of management on our financial condition, results of operations, liquidity and other factors that may affect our future results. We believe it is important to read our MD&A in conjunction with our Annual Report on Form 10-K for the year ended December 31, 2009, as well as other publicly available information.

This report contains numerous forward-looking statements relating to the Company’s gold and silver mining business, including estimated production data, expected operating schedules, expected capital costs and other operating data and permit and other regulatory approvals. Such forward-looking statements are identified by the use of words such as “believes,” “intends,” “expects,” “hopes,” “may,” “should,” “plan,” “projected,” “contemplates,” “anticipates” or similar words. Actual production, operating schedules, results of operations, ore reserve and resource estimates and other projections and estimates could differ materially from those projected in the forward-looking statements. The factors that could cause actual results to differ materially from those projected in the forward-looking statements include (i) the risk factors set forth below under Item 1A, (ii) the risks and hazards inherent in the mining business (including environmental hazards, industrial accidents, weather or geologically related conditions), (iii) changes in the market prices of gold and silver, (iv) the uncertainties inherent in the Company’s production, exploratory and developmental activities, including risks relating to permitting and regulatory delays, (v) any future labor disputes or work stoppages, (vi) the uncertainties inherent in the estimation of gold and silver ore reserves, (vii) changes that could result from the Company’s future acquisition of new mining properties or businesses, (viii) reliance on third parties to operate certain mines where the Company owns silver production and reserves, (ix) the loss of any third-party smelter to which the Company markets silver and gold, (x) the effects of environmental and other governmental regulations, (xi) the risks inherent in the ownership or operation of or investment in mining properties or businesses in foreign countries, (xii) the worldwide economic downturn and difficult conditions in the global capital and credit markets, and (xiii) the Company’s ability to raise additional financing necessary to conduct its business, make payments or refinance its debt. Readers are cautioned not to put undue reliance on forward-looking statements. The Company disclaims any intent or obligation to update publicly these forward-looking statements, whether as a result of new information, future events or otherwise.

MD&A includes references to total operating cash costs and cash costs per ounce of silver produced both on an individual mine basis and on a consolidated basis. Total cash operating costs per ounce and cash costs per ounce are measurements that management uses to monitor and evaluate the performance of its mining operations and is not a measurement calculated under U.S. GAAP. A reconciliation of total operating cash costs and cash costs per ounce to production expenses, which is calculated under U.S. GAAP, is also provided in the section titled “Operating Statistics” herein and should be referred to when reading the total cash costs per ounce measurement.

#### General

The Company is a large primary silver producer with growing gold production and it has assets located in the United States, Mexico, Bolivia, Argentina, Chile and Australia. The Palmarejo mine, San Bartolomé mine, Rochester mine and Martha mine, each of which is operated by the Company, and the Endeavor mine, which is operated by a non-affiliated party, constituted the Company’s principal sources of mining revenues during the first quarter of 2010. Coeur is an Idaho corporation incorporated in 1928.

The Company’s business strategy is to discover, acquire, develop and operate low-cost silver and gold operations that will produce long-term cashflow, provide opportunities for growth through continued exploration, and generate superior and sustainable returns for shareholders.

The Company’s management focuses on maximizing cash flow from its existing operations, the main factors of which are silver and gold prices, cash costs of production and capital expenditures. The Company also focuses on reducing its non-operating costs in order to maximize cashflow.

The results of the Company’s operations are significantly affected by fluctuation in prices of silver and gold, which may fluctuate widely and are affected by numerous factors beyond our control, including interest rates, expectations regarding inflation, currency values, governmental decisions regarding the disposal of precious metals stockpiles, global and regional political and economic conditions and other factors. In addition, we face challenges including raising capital and increasing production and dealing with social, political and environmental issues. Operating costs at our mines are subject to variation due to a number of factors such as changing commodity prices, ore grades, metallurgy, revisions to mine plans and changes in accounting principles. At foreign locations, operating costs are also influenced by currency fluctuations that may affect our U.S. dollar costs.

In addition to the matters discussed above regarding the key factors of the Company’s business strategy, the most important matters management considers in evaluating the Company’s financial condition and results of operations include:

- The average price of silver (Handy & Harman) and gold (London Final) for the three months ended March 31, 2010 was $16.92 and $1,109 per ounce, respectively. The market price of silver and gold on May 6, 2010 was $17.60 per ounce and $1,185 per ounce, respectively.
- The Company owns 100% of Coeur Mexicana S.A. de C.V., which operates the underground and surface Palmarejo silver and gold mine in Mexico. The Palmarejo mine poured its first silver/gold doré on March 30, 2009 and began shipping doré on April 16, 2009. During the first quarter of 2010 Palmarejo produced 1.3 million ounces of silver and 22,577 gold ounces. Silver recoveries improved to 72.7% as compared to recoveries of 66.3% in 2009.
- The Company owns 100% of Empresa Minera Manquiri S.A., a Bolivian company that controls the mining rights for the San Bartolomé mine, a surface silver mine in Bolivia where commercial production commenced in June 2008. San Bartolomé produced 1.0 million ounces of silver during the first quarter of 2010. San Bartolomé has begun mining operations in a high grade material located in the Huacajchi deposit above the 4,400 meter level under its agreement with the Cooperative Reserva Fiscal. The Huacajchi was confirmed to be excluded from the October 2009 resolution restricting mining above the 4,400 meter level of Cerro Rico Mountain. Access to the Huacajchi and its higher grade material is expected to have a beneficial impact on production and costs at the mine. Other mining areas above the 4,400 meter level continue to be temporarily suspended while stability studies of Cerro Rico Mountain are under taken by COMIBOL, the state owned mining organization. See discussion under operating highlights and statistics, San Bartolomé for further details.
- The Company owns 100% of Coeur Alaska, Inc. (“Coeur Alaska”), which owns the Kensington property, an advanced underground gold property located north of Juneau, Alaska. Construction activities remain on schedule and on budget and production is expected to begin in July 2010.
- The Company owns 100% of Coeur Rochester, Inc., which operated the Rochester mine, a silver and gold surface mining operation located in northwestern Nevada since 1986. The active mining of ore at the Rochester mine was completed during 2007; however, silver and gold production is expected to continue through 2014 as a result of continuing heap leaching operations. During 2009, the Company completed a technical and economic evaluation of the continuation of mining operations at its Rochester mine. This study envisions an average of 2.9 million ounces of incremental annual silver production and 30,000 ounces of further gold production through 2017. The Company expects to complete the permitting necessary for construction of facilities this year to restart active mining in early 2011. Rochester produced 0.5 million ounces of silver and 2,690 ounces of gold in the first quarter of 2010.
- The Company owns 100% of the capital stock of Coeur Argentina S.R.L. which owns and operates the underground high-grade silver and gold Martha mine located in Santa Cruz, Argentina. During the first quarter of 2010, Martha produced 365,226 ounces of silver. Due to depletion of the ore reserve at the Martha mine, the Company expects operating activities will cease in late 2010, unless additional mineralization is discovered during the year. In addition, the Company is pursuing strategic alternatives at Martha.

Coeur also has interests in other properties that are subject to silver or gold exploration activities upon which no minable ore reserves have yet been delineated.

### Operating Highlights and Statistics

### South American Operations

San Bartolomé Mine:

Silver production for the first quarter of 2010 was 1.0 million ounces of silver compared to 2.1 million ounces of silver in the first quarter of 2009. Total operating costs per ounce during the first quarter of 2010 were $9.98 and total cash costs per ounce, which include royalties and taxes, were $10.84 compared to total cash operating costs per ounce of $6.74 and total cash costs per ounce of $8.17 during the first quarter of 2009. The decreased production and the increased total cash costs per ounce occurred primarily because of the temporary suspension of mining above the 4,400 meter level of the Cerro Rico Mountain which was mandated in October 2009 as discussed below.

On October 14, 2009, the Bolivian state-owned mining organization, (“COMIBOL”), announced by resolution its temporarily suspension of mining activities above the elevation of 4,400 meters above sea level while stability studies of Cerro Rico mountain are undertaken. The Company holds rights to mine above this elevation under valid contracts backed by Supreme Decree with COMIBOL as well as contracts with local mining cooperatives who hold their rights through COMIBOL. The Company has told COMIBOL that it will temporarily adjust its mine plan to confine its activities to the ore deposits below 4,400 meters above sea level. Cerro Rico mountain is a historic mining area that is the subject of centuries of unregulated underground mining by numerous groups and individuals. The Company does not use explosives in its surface-only mining activities and is sensitive to the preservation of the mountain under its contracts with the state-owned mining entity and the local cooperatives. It is uncertain at this time how long the temporary suspension will remain in place.

In March, 2010, San Bartolomé resumed mining operations of high grade material located in the Huacajchi deposit above the 4,400 meter level under its agreement with the Cooperative Reserva Fiscal. The Huacajchi was confirmed to be excluded from the October 2009 resolution restricting mining above the 4,400 meter level of Cerro Rico Mountain. Access to the Huacajchi deposit and its higher grade material is expected to have a beneficial impact on production and costs at the mine. Monthly production levels increased to approximately 452,000 ounces of silver during March 2010, up from 282,000 ounces of silver in January 2010. Other mining areas above the 4,400 meter level continue to be temporarily suspended while stability studies of Cerro Rico Mountain are under taken by COMIBOL.

Martha Mine:

Silver production decreased 54.8% to 365,226 ounces in the first quarter of 2010 compared to 808,007 ounces in the first quarter of 2009. The decrease in silver production was primarily due to a 36.8% decrease in tons milled and a decrease of 22.4% in silver grades.

Total cash operating costs per ounce in the first quarter of 2010 were $15.47 and total cash costs per ounce, including royalties and taxes, were $15.95 as compared to $5.74 and $6.21, respectively, during the first quarter of 2009. The increase in total cash cost per ounce was primarily due to a decrease in silver production attributable to a 36.8% decrease in tons milled in the first quarter of 2010 compared to the first quarter of 2009. The Company expects active mining operations will cease in late 2010 unless additional mineralization is discovered during the year. In addition, the Company is pursuing strategic alternatives at Martha.

Cerro Bayo Mine:

On October 31, 2008, the Company temporarily suspended operating activities at the Cerro Bayo mine due primarily to higher operating costs. There was no production at the mine during the three months ended March 31, 2010 and 2009. On May 4, 2010, the Company announced that it had agreed to sell to Mandalay Resources its 100% of the shares of its wholly owned subsidiary Compania Minera Cerro Bayo. See Note 18, Subsequent Events, for further details.

### North American Operations

Palmarejo Mine:

The Palmarejo mine commenced commercial production on April 20, 2009. Silver production during the first quarter of 2010 was 1.3 million ounces and 22,577 ounces of gold. Cash operating costs and total cash costs per ounce during the first quarter were $5.41. Silver production increased 10% and gold production increased 9% over the prior quarter while cash operating costs per ounce declined 12%. In addition, silver recoveries continued to increase during the first quarter of 2010.

Rochester Mine:

Silver production was 522,159 ounces and gold production was 2,690 ounces during the first quarter of 2010 compared to 469,861 ounces of silver and 2,818 ounces of gold in the first quarter of 2009. Production was higher due to increased ounces recovered from the ore on leach pad. Total cash operating costs per ounce in the first quarter of 2010 were $1.68 and total cash costs per ounce, including production taxes, were $2.35 in the first quarter of 2010 as compared to total cash operating costs per ounce of $2.82 and total cash costs per ounce of $3.36 in the first quarter of 2009. The decrease in total cash cost per ounce was primarily due to an increase in by-product credits related to increases in gold prices as compared to the first quarter of 2009.

The Company completed a study for continuation of active mining operations in the first quarter of 2010 and is working towards a potential expansion of mining activities in early 2011.

### Australia Operations

Endeavor Mine:

Silver production at the Endeavor mine in the first quarter of 2010 was 204,253 ounces of silver compared to 141,814 ounces of silver in the first quarter of 2009. The increase in silver production was primarily due to a 174.8% increase in ore grades partially offset by a 22.2% decrease in tons milled as compared to the first quarter of 2009. Total cash costs per ounce of silver produced were $7.40 in the first quarter of 2010 compared to $4.94 in the first quarter of 2009. The increase in total cash cost per ounce was primarily due to the price participation component terms of the transaction which were not in effect during the first quarter of 2009. Under the terms of the price participation component, CDE Australia Pty. Ltd, a subsidiary of the Company, pays an additional operating cost contribution of 50% of the amount by which the silver price exceeds $7.00 per ounce.

As of March 31, 2010, CDE Australia had recovered approximately 52% of the transaction consideration consisting of 2.7 million payable ounces, or 13.3% of the 20 million maximum payable silver ounces to which CDE Australia is entitled under the terms of the silver sale and purchase agreement. No assurances can be made that the mine will achieve its 20.0 million payable silver ounce cap to which CDE Australia is entitled under the terms of the silver sale and purchase agreement.

### Operating Statistics from Continuing Operations

The following table presents information by mine and consolidated sales information for the three-month periods ended March 31, 2010 and 2009:

| Palmarejo(A) | Three Months Ended March 31, 2010 | 2009 |
| --- | ---: | ---: |
| Tons milled | 458,006 | — |
| Ore grade/Ag oz | 3.91 | — |
| Ore grade/Au oz | 0.05 | — |
| Recovery/Ag oz (A) | 72.7% | — |
| Recovery/Au oz (A) | 92.1% | — |
| Silver production ounces | 1,300,593 | — |
| Gold production ounces | 22,577 | — |
| Cash operating costs/oz | $5.41 | — |
| Cash cost/oz | $5.41 | — |
| Total production cost/oz | $21.39 | — |
| **San Bartolomé** |  |  |
| Tons milled | 293,106 | 363,779 |
| Ore grade/Ag oz | 3.74 | 6.80 |
| Recovery/Ag oz | 94.8% | 85.4% |
| Silver production ounces | 1,039,926 | 2,113,551 |
| Cash operating costs/oz | $9.98 | $6.74 |
| Cash cost/oz | $10.84 | $8.17 |
| Total production cost/oz | $13.89 | $10.62 |
| **Martha Mine** |  |  |
| Tons milled | 17,575 | 27,817 |
| Ore grade/Ag oz | 24.59 | 31.69 |
| Ore grade/Au oz | 0.03 | 0.04 |
| Recovery/Ag oz | 84.5% | 91.7% |
| Recovery/Au oz | 88.5% | 84.4% |
| Silver production ounces | 365,226 | 808,007 |
| Gold production ounces | 515 | 973 |
| Cash operating costs/oz | $15.47 | $5.74 |
| Cash cost/oz | $15.95 | $6.21 |
| Total production cost/oz | $22.31 | $7.62 |
| Rochester(B) |  |  |
| Silver production ounces | 522,159 | 469,861 |
| Gold production ounces | 2,690 | 2,818 |
| Cash operating costs/oz | $1.68 | $2.82 |
| Cash cost/oz | $2.35 | $3.36 |
| Total production cost/oz | $3.37 | $4.44 |
| **Endeavor** |  |  |
| Tons milled | 129,872 | 166,971 |
| Ore grade/Ag oz | 3.27 | 1.19 |
| Recovery/Ag oz | 48.1% | 71.5% |
| Silver production ounces | 204,253 | 141,814 |
| Cash operating costs/oz | $7.40 | $4.94 |
| Cash cost/oz | $7.40 | $4.94 |
| Total production cost/oz | $10.63 | $7.52 |
| CONSOLIDATED PRODUCTION TOTALS(C) |  |  |
| Silver ounces | 3,432,157 | 3,533,233 |
| Gold ounces | 25,782 | 3,791 |
| Cash operating costs/oz | $7.41 | $5.92 |
| Cash cost per oz/silver | $7.83 | $6.95 |
| Total production cost/oz | $15.84 | $8.99 |
| CONSOLIDATED SALES TOTALS (D) |  |  |
| Silver ounces sold | 3,633,695 | 3,224,285 |
| Gold ounces sold | 25,734 | 5,096 |
| Realized price per silver ounce | $16.84 | $12.34 |
| Realized price per gold ounce | $1,104 | $876 |

40

(A) Palmarejo achieved commercial production on April 20, 2009.

(B) The leach cycle at Rochester requires 5 to 10 years to recover gold and silver contained in the ore. The Company estimates the ultimate recovery to be approximately 61.5% for silver and 93% for gold. However, ultimate recoveries will not be known until leaching operations cease, which is currently estimated for 2014. Current recovery may vary significantly from ultimate recovery. See Critical Accounting Policies and Estimates — Ore on Leach Pad.

(C) Current production ounces and recoveries reflect final metal settlements of previously reported production ounces.

(D) Units sold at realized metal prices will not match reported metal sales due primarily to the effects on revenues of mark-to-market adjustments on embedded derivatives in the Company’s provisionally priced sales contracts.

“Operating Costs per Ounce” and “Cash Costs per Ounce” are calculated by dividing the operating cash costs and cash costs computed for each of the Company’s mining properties for a specified period by the amount of gold ounces or silver ounces produced by that property during that same period. Management uses cash operating costs and cash costs per ounce as key indicators of the profitability of each of its mining properties. Gold and silver are sold and priced in the world financial markets on a U.S. dollar per ounce basis.

“Cash Operating Costs” and “Cash Costs” are costs directly related to the physical activities of producing silver and gold, and include mining, processing and other plant costs, third-party refining and smelting costs, marketing expenses, on-site general and administrative costs, royalties, in-mine drilling expenditures that are related to production and other direct costs. Sales of by-product metals are deducted from the above in computing cash costs. Cash costs exclude depreciation, depletion and amortization, accretion, corporate general and administrative expenses, exploration, interest, and pre-feasibility costs. Cash operating costs include all cash costs except production taxes and royalties, if applicable. Cash costs are calculated and presented using the “Gold Institute Production Cost Standard” applied consistently for all periods presented.

Total operating costs and cash costs per ounce are non-U.S. GAAP measures and investors are cautioned not to place undue reliance on them it and are urged to read all U.S. GAAP accounting disclosures presented in the consolidated financial statements and accompanying footnotes. In addition, see the reconciliation of “cash costs” to production costs under “Reconciliation of Non-U.S. GAAP Cash Costs to U.S. GAAP Production Costs” set forth below.

The following tables present a reconciliation between non-U.S. GAAP cash operating costs per ounce and cash costs per ounce to production costs applicable to sales including depreciation, depletion and amortization, which is calculated in accordance with U.S. GAAP:

### Three Months Ended March 31, 2010

(In thousands except ounces and per ounce costs)

|  | Palmarejo(1) | San Bartolomé | Martha | Rochester | Endeavor | Total |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Production of silver (ounces) | 1,300,593 | 1,039,926 | 365,226 | 522,159 | 204,253 | 3,432,157 |
| Cash operating cost per ounce | $5.41 | $9.98 | $15.47 | $1.68 | $7.40 | $7.41 |
| Cash costs per ounce | $5.41 | $10.84 | $15.95 | $2.35 | $7.40 | $7.83 |
| Total Operating Cost (Non-U.S. GAAP) | 7,030 | 10,379 | 5,648 | 878 | 1,511 | 25,446 |
| Royalties | — | 892 | 177 | — | — | 1,069 |
| Production taxes | — | — | — | 348 | — | 348 |
| Total Cash Costs (Non-U.S. GAAP) | 7,030 | 11,271 | 5,825 | 1,226 | 1,511 | 26,863 |
| Add/Subtract: |  |  |  |  |  |  |
| Third party smelting costs | (784) | — | (693) | — | (264) | (1,741) |
| By-product credit (2) | 25,045 | — | 571 | 2,988 | — | 28,604 |
| Other adjustments | — | — | 6 | 68 | — | 74 |
| Change in inventory | (3,408) | (1,868) | 1,617 | 1,507 | (629) | (2,781) |
| Depreciation, depletion and amortization | 20,793 | 3,177 | 2,317 | 465 | 660 | 27,412 |
| Production costs applicable to sales, including depreciation, depletion and amortization (U.S. GAAP) | $48,676 | $12,580 | $9,643 | $6,254 | $1,278 | $78,431 |

### Three Months Ended March 31, 2009

(In thousands except ounces and per ounce costs)

|  | Palmarejo | San Bartolomé | Martha | Rochester | Endeavor | Total |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Production of silver (ounces) | — | 2,113,551 | 808,007 | 469,861 | 141,814 | 3,533,233 |
| Cash operating costs per ounce | $— | $6.74 | $5.74 | $2.82 | $4.94 | $5.92 |
| Cash costs per ounce | $— | $8.17 | $6.21 | $3.36 | $4.94 | $6.95 |
| Total operating cost (Non-U.S. GAAP) | $— | $14,247 | $4,635 | $1,326 | $701 | $20,909 |
| Royalties | — | 3,024 | 384 | — | — | 3,408 |
| Production taxes | — | — | — | 254 | — | 254 |
| Total cash costs (Non-U.S. GAAP) | — | 17,271 | 5,019 | 1,580 | 701 | 24,571 |
| Add/Subtract: |  |  |  |  |  |  |
| Third party smelting costs | — | — | (1,467) | — | (272) | (1,739) |
| By-product credit(2) | — | — | 883 | 2,557 | — | 3,440 |
| Other adjustments | — | 8 | — | 35 | — | 43 |
| Change in inventory | — | (2,091) | 35 | 535 | (73) | (1,594) |
| Depreciation, depletion and amortization | — | 5,173 | 1,140 | 470 | 365 | 7,148 |
| Production costs applicable to sales, including depreciation, depletion and amortization (U.S. GAAP) | $— | $20,361 | $5,610 | $5,177 | $721 | $31,869 |

(1) The Palmarejo gold production royalty is currently reflected as a minimum royalty obligation which commenced on July 1, 2009 and ends when payments have been made on a total of 400,000 ounces of gold, at which time a royalty expense will be recorded.

(2) Amounts include final metal settlement adjustments.

42

The following tables present a reconciliation between non-U.S. GAAP cash costs per ounce to U.S. GAAP production costs applicable to sales reported in Discontinued Operations for the years ended (see Note 4 — Discontinued Operations):

| Broken Hill | Three Months Ended March 31, 2009 |
| --- | ---: |
| Production of Silver (ounces) | 389,410 |
| Cash operating costs per ounce | $3.45 |
| Cash Costs per ounce | $3.45 |
| Total Cash Costs (Non-U.S. GAAP) | 1,343 |
| Add/Subtract: |  |
| Third party smelting costs | (530) |
| Change in inventory | (28) |
| Depreciation, depletion and amortization | 747 |
| Production costs applicable to sales, including depreciation, depletion and amortization (U.S. GAAP) | $1,532 |

### Exploration Activity

In the three months ended March 31, 2010, the Company spent approximately $3.8 million on its global exploration program. The majority of this was devoted to exploration around its large operating properties.

#### Palmarejo (Mexico)

The Company spent $1.6 million on exploration at the Palmarejo District during the three months ended March 31, 2010 to discover new silver and gold mineralization and define new ore reserves.

The major part of this work was on drilling around the Palmarejo mine from both surface and underground platforms. Over 11,400 meters (37,400 feet) of core drill was completed in the quarter. In addition drilling recommenced on the Guadalupe Norte target at the north end of the long Guadalupe mineral system in the Palmarejo District.

#### Cerro Bayo Mine (Chile)

No exploration was conducted at Cerro Bayo during the first quarter of 2010.

#### Martha Mine (Argentina)

No exploration work was conducted at the mine in the first quarter of 2010.

In addition to its holdings at the Martha mine, the Company also conducts exploration in other parts of the Santa Cruz Province in Argentina. In the first quarter of 2010 the Company focused this effort on the Joaquin property, on which the Company has an option to acquire a majority, managing joint venture interest with Mirasol Resources Ltd. At Joaquin a fourth phase of drilling and further reconnaissance to identify new targets commenced in the first quarter of 2010. Nearly 3,800 meters (12,500 feet) was completed at the La Negra and La Morocha targets. A total of $1.2 million was spent in Argentina in the quarter.

#### Kensington (USA)

Exploration consisted of mapping and sampling, and completion of a new drill drift to support exploration drilling in the second quarter of 2010. The drilling activities in the first quarter were focused on tight-spaced definition of areas slated for mining this year. Drilling will continue on these areas and will start in second quarter of 2010.

#### Rochester (USA)

Exploration work consisted of mapping, sampling and detailed modeling of ore zones slated for future mining at Rochester. In addition, plans for an exploration drill campaign were prepared with a goal of a late second quarter start-up.

### Development Projects:

#### Kensington (Alaska)

The Company invested $29.9 million at Kensington during the first quarter of 2010 and expects to invest an additional $28 million during the second quarter of 2010 prior to production commencing in July 2010. Production during the mine’s initial, partial year is expected to be approximately 50,000 ounces of gold. Based on an initial 12.5 year mine life from current proven and probable mineral reserves, the Company expects gold production to average approximately 125,000 ounces annually and total operating costs to average $475 per ounce.

### Critical Accounting Policies and Estimates

Management considers the following policies to be most critical in understanding the judgments that are involved in preparing the Company’s consolidated financial statements and the uncertainties that could impact its results of operations, financial condition and cash flows. Our consolidated financial statements are affected by the accounting policies used and the estimates and assumptions made by management during their preparation. We have identified the policies below as critical to our business operations and the understanding of our results of operations. The information provided herein is based on our consolidated financial statements, which have been prepared in accordance with U.S. GAAP. The preparation of these statements requires that we make estimates and assumptions that affect the reported amounts of assets and liabilities, disclosure of contingent assets and liabilities at the date of our financial statements, and the reported amounts of revenue and expenses during the reporting period. We base these estimates on historical experience and on assumptions that we consider reasonable under the circumstances; however, reported results could differ from those based on the current estimates under different assumptions or conditions. The effects and associated risks of these policies on our business operations are discussed throughout this discussion and analysis. The areas requiring the use of management’s estimates and assumptions relate to recoverable ounces from proven and probable reserves that are the basis of future cash flow estimates and units-of-production depreciation and amortization calculations; useful lives utilized for depreciation, depletion, and long lived assets; estimates of recoverable gold and silver ounces in ore on leach pad; reclamation and remediation costs; valuation allowance for deferred tax assets; and post-employment and other employee benefit liabilities. For a detailed discussion on the application of these and other accounting policies, see Note 2 in the Notes to the Consolidated Financial Statements of this Form 10-Q.

**Revenue Recognition**. Revenue includes sales value received for our principal product, silver, and associated by-product revenues from the sale of by-product metals consisting primarily of gold and copper. Revenue is recognized when title to silver and gold passes to the buyer and when collectability is reasonably assured. Title passes to the customer based on terms of the sales contract. Product pricing is determined at the point revenue is recognized by reference to active and freely traded commodity markets, for example, the London Bullion Market for both gold and silver, in an identical form to the product sold.

Under our concentrate sales contracts with third-party smelters, final gold and silver prices are set on a specified future quotational period, typically one to three months, after the shipment date based on market metal prices. Revenues are recorded under these contracts at the time title passes to the buyer based on the forward price for the expected settlement period.

The contracts, in general, provide for provisional payment based upon provisional assays and quoted metal prices. Final settlement is based on the average applicable price for a specified future period and generally occurs from three to six months after shipment. Final sales are settled using smelter weights, settlement assays (average of assays exchanged and/or umpire assay results) and are priced as specified in the smelter contract. The Company’s provisionally priced sales contain an embedded derivative that is required to be separated from the host contract for accounting purposes. The host contract is the receivable from the sale of concentrates at the forward price at the time of sale. The embedded derivative does not qualify for hedge accounting. The embedded derivative is recorded as a derivative asset in prepaid expenses and other assets or as a derivative liability in accrued liabilities and other on the balance sheet and is adjusted to fair value through revenue each period until the date of final gold and silver settlement. The form of the material being sold, after deduction for smelting and refining, is in an identical form to that sold on the London Bullion Market. The form of the product is metal in flotation concentrate, which is the final process for which the Company is responsible. Revenue includes sales of by-product gold from its mining operations.

The effects of forward sales contracts are reflected in revenue at the date the related precious metals are delivered. Third-party smelting and refining costs are recorded as a reduction of revenue.

At March 31, 2010, the Company had outstanding provisionally priced sales of $18.7 million, consisting of 1.0 million ounces of silver and 1,266 ounces of gold, which had a fair value of $19.3 million including the embedded derivative. For each one cent per ounce change in realized silver price, revenue would vary (plus or minus) approximately $10,000; and for each one dollar per ounce change in realized gold price, revenue would vary (plus or minus) approximately $1,300. At December 31, 2009, the Company had outstanding provisionally priced sales of $19.1 million consisting of 1.0 million ounces of silver and 1,227 ounces of gold, which had a fair value of approximately $19.1 million including the embedded derivative. For each one cent per ounce change in realized silver price, revenue would vary (plus or minus) approximately $10,000 and for each one dollar per ounce change in realized gold price, revenue would vary (plus or minus) approximately $1,200.

**Estimates.** The preparation of the Company’s consolidated financial statements in conformity with U.S. GAAP requires management to make estimates and assumptions that affect the reported amount of assets and liabilities, disclosure of contingent assets and liabilities at the date of our financial statements, and the reported amounts of revenue and expenses during the reporting period. There can be no assurance that actual results will not differ from those estimates. The most critical accounting principles upon which the Company’s financial status depends are those requiring estimates of recoverable ounces from proven and probable reserves and/or assumptions of future commodity prices. There are a number of uncertainties inherent in estimating quantities of reserves, including many factors beyond our control. Ore reserves estimates are based upon engineering evaluations of samplings of drill holes and other openings. These estimates involve assumptions regarding future silver and gold prices, the geology of our mines, the mining methods we use and the related costs we incur to develop and mine our reserves. Changes in these assumptions could result in material adjustments to our reserve estimates. We use reserve estimates in determining the units-of-production depreciation and amortization expense, as well as in evaluating mine asset impairments.

We review and evaluate our long-lived assets for impairment when events or changes in circumstances indicate that the related carrying amounts may not be recoverable. An impairment is considered to exist if total estimated future cash flows or probability-weighted cash flows on an undiscounted basis are less than the carrying amount of the assets, including property, plant and equipment, mineral property, development property, and any deferred costs. The accounting estimates related to impairment are critical accounting estimates because the future cash flows used to determine whether an impairment exists is dependent on reserve estimates and other assumptions, including silver and gold prices, production levels, and capital and reclamation costs, all of which are based on detailed engineering life-of-mine plans.

We depreciate our property, plant and equipment, mining properties and mine development using the units-of-production method over the estimated life of the ore body based on our proven and probable recoverable reserves or on a straight-line basis over the useful life, whichever is shorter. The accounting estimates related to depreciation and amortization are critical accounting estimates because 1) the determination of reserves involves uncertainties with respect to the ultimate geology of our reserves and the assumptions used in determining the economic feasibility of mining those reserves and 2) changes in estimated proven and probable reserves and useful asset lives can have a material impact on net income.

**Ore on Leach Pad.** The heap leach process is a process of extracting silver and gold by placing ore on an impermeable pad and applying a diluted cyanide solution that dissolves a portion of the contained silver and gold, which are then recovered in metallurgical processes. In August 2007, the Company terminated mining and crushing operations at the Rochester mine as ore reserves were fully mined. Residual heap leach activities are expected to continue through 2014.

The Company used several integrated steps to scientifically measure the metal content of ore placed on the leach pads. As the ore body was drilled in preparation for the blasting process, samples were taken of the drill residue which is assayed to determine estimated quantities of contained metal. The Company estimated the quantity of ore by utilizing global positioning satellite survey techniques. The Company then processed the ore through crushing facilities where the output was again weighed and sampled for assaying. A metallurgical reconciliation with the data collected from the mining operation was completed with appropriate adjustments made to previous estimates. The crushed ore was then transported to the leach pad for application of the leaching solution. As the leach solution is collected from the leach pads, it is continuously sampled for assaying. The quantity of leach solution is measured by flow meters throughout the leaching and precipitation process. After precipitation, the product is converted to dorè, which is the final product produced by the mine. The inventory is stated at lower of cost or market, with cost being determined using a weighted average cost method.

The Company reported ore on leach pad of $22.7 million as of March 31, 2010. Of this amount, $7.7 million is reported as a current asset and $15.0 million is reported as a non-current asset. The distinction between current and non-current is based upon the expected length of time necessary for the leaching process to remove the metals from the broken ore. The historical cost of the metal that is expected to be extracted within twelve months is classified as current and the historical cost of metals contained within the broken ore that will be extracted beyond twelve months is classified as non-current. Inventories of ore on leach pad are valued based on actual production costs incurred to produce and place ore on the leach pad, adjusted for effects on monthly production of costs of abnormal production levels, less costs allocated to minerals recovered through the leach process.

The estimate of both the ultimate recovery expected over time and the quantity of metal that may be extracted relative to the time the leach process occurs requires the use of estimates which are inherently inaccurate since they rely upon laboratory testwork. Testwork consists of 60 day leach columns from which the Company projects metal recoveries up to five years in the future. The quantities of metal contained in the ore are based upon actual weights and assay analysis. The rate at which the leach process extracts gold and silver from the crushed ore is based upon laboratory column tests and actual experience occurring over more than twenty years of leach pad operations at the Rochester Mine. The assumptions used by the Company to measure metal content during each stage of the inventory conversion process includes estimated recovery rates based on laboratory testing and assaying. The Company periodically reviews its estimates compared to actual experience and revises its estimates when appropriate. During the first quarter of 2010, the Company increased its estimated silver ounces contained in the heap inventory by 1.2 million ounces. The increase in estimated silver ounces contained in the heap inventory is due to changes in estimated recoveries anticipated for the remainder of the residual leach phase. There were no significant changes in estimates related to gold contained in the heap. Consequently, the Company believes its current residual heap leach activities are expected to continue through 2014. The ultimate recovery will not be known until leaching operations cease. If our estimate of ultimate recovery requires adjustment, the impact upon our valuation and upon our income statement would be as follows:

|  | Positive/Negative Change in Silver Recovery |  |  | Positive/Negative Change in Gold Recovery |  |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
|  | **1%** | **2%** | **3%** | **1%** | **2%** | **3%** |
| Quantity of recoverable ounces | 1.7 million | 3.5 million | 5.2 million | 13,240 | 26,480 | 39,720 |
| Positive impact on future cost of production per silver equivalent ounce for increases in recovery rates | $3.09 | $2.50 | $2.10 | $3.51 | $3.10 | $2.77 |
| Negative impact on future cost of production per silver equivalent ounce for decreases in recovery rates | $5.87 | $10.65 | $12.21 | $4.78 | $5.84 | $6.05 |

Inventories of ore on leach pads are valued based upon actual production costs incurred to produce and place such ore on the leach pad during the current period, adjusted for the effects on monthly production of costs of abnormal production levels, less costs allocated to minerals recovered through the leach process. The costs consist of those production activities occurring at the mine site and include the costs, including depreciation, associated with mining, crushing and precipitation circuits. In addition, refining is provided by a third-party refiner to place the metal extracted from the leach pad in a saleable form. These additional costs are considered in the valuation of inventory.

**Reclamation and remediation costs.** The Company recognizes obligations associated with the retirement of tangible long-lived assets and the associated asset retirement costs. These legal obligations are associated with the retirement of long-lived assets that result from the acquisition, construction, development and normal use of the asset. The fair value of a liability for an asset retirement obligation will be recognized in the period in which it is incurred if a reasonable estimate of fair value can be made. The fair value of the liability is added to the carrying amount of the associated asset and this additional carrying amount is depreciated over the life of the asset. An accretion cost, representing the increase over time in the present value of the liability, is recorded each period in depreciation, depletion and amortization expense. As reclamation work is performed or liabilities are otherwise settled, the recorded amount of the liability is reduced.

Future remediation costs for inactive mines are accrued based on management’s best estimate at the end of each period of the undiscounted costs expected to be incurred at the site. Such cost estimates include, where applicable, ongoing care and maintenance and monitoring costs. Changes in estimates are reflected in earnings in the period an estimate is revised.

**Income taxes.** The Company computes income taxes using an asset and liability approach which results in the recognition of deferred tax liabilities and assets for the expected future tax consequences or benefits of temporary differences between the financial reporting bases and the tax bases of assets and liabilities, as well as operating loss and tax credit carryforwards, using enacted tax rates in effect in the years in which the differences are expected to reverse.

In assessing the realizability of deferred tax assets, management considers whether it is more likely than not that some portion or all of its deferred tax assets will not be realized. Management considers the scheduled reversal of deferred tax liabilities, projected future taxable income and tax planning strategies in making this assessment. A valuation allowance has been provided for the portion of the Company’s net deferred tax assets for which it is more likely than not that they will not be realized.

The Company and its subsidiaries are subject to U.S. federal income tax as well as income tax of multiple state and foreign jurisdictions. The Company has substantially concluded all U.S. federal income tax matters for years through 1999. Federal income tax returns for 2000 through 2008 are subject to examination. The Company’s practice is to recognize interest and/or penalties related to income tax matters in income tax expense. There were no significant accrued interest or penalties at March 31, 2010.

### RESULTS OF OPERATIONS

### Three Months Ended March 31, 2010 Compared to Three Months Ended March 31, 2009

Sales of metal from continuing operations in the first quarter of 2010 increased by 94.1% or $42.4 million to $87.5 million. The increase in sales of metal was primarily due to an increase in the quantity of gold ounces sold due to contributions from the Company’s Palmarejo silver and gold mine, which began commercial production on April 20, 2009. In the first quarter of 2010, the Company sold 3.6 million ounces of silver and 25,734 ounces of gold compared to 3.2 million ounces of silver and 5,096 ounces of gold for the same period in 2009. Realized silver and gold prices were $16.84 and $1,104 per ounce, respectively, in the first quarter of 2010, compared to $12.34 and $876 per ounce, respectively, in the comparable quarter of 2009.

Included in revenues is the by-product revenue derived from the sale of gold. During the first quarter of 2010, by-product revenues totaled $27.9 million compared to $4.5 million in the first quarter of 2009. The increase is due to additional ounces of gold sold in the first quarter of 2010 primarily as a result of the Company’s Palmarejo mine which operated for the entire first quarter of 2010. The Company believes that presentation of these revenue streams as by-products from its current operations will continue to be appropriate in the future.

In the first quarter of 2010, the Company produced a total of 3.4 million ounces of silver and 25,782 ounces of gold, compared to 3.5 million ounces of silver and 3,791 ounces of gold in the first quarter of 2009. The decrease in silver production is primarily due to the decrease of 1.1 million ounces at the San Bartolomé mine, due to mining restrictions above the 4,400 meter level in 2010 and a decrease of 442,781 ounces at the Martha mine, offset by an increase of 1.3 million ounces from the Company’s Palmarejo mine, which operated at full capacity during the quarter. The increase in gold production in the first quarter of 2010 compared to the first quarter of 2009 is primarily due to the increase of 22,577 ounces of gold from the Palmarejo mine.

Production costs applicable to sales of metal in the first quarter of 2010 increased to $51.0 million, from $25.9 million in the first quarter of 2009. The increase in production costs is primarily due to costs related to the commencement of operating activities at the Palmarejo mine, which was not in production during the first quarter of 2009.

Depreciation and depletion increased by $20.3 million, from $8.5 million to $28.8 million, as compared to the first quarter of 2009. The increase is due to depreciation and depletion expense from the Palmarejo mine, which was not in production during the first quarter of 2009.

#### Costs and Expenses

Administrative and general expenses decreased by $0.8 million, from $7.5 million to $6.7 million, as compared to the first quarter of 2009. The decrease of 11% is primarily due to ongoing reductions in corporate administrative costs.

Exploration expenses decreased by $1.3 million to $2.5 million in the first quarter of 2010 compared to $3.8 million in the same period of 2009 as a result of a decreased exploration activities.

Care and maintenance expenses were $1.5 million during the first quarter of 2010 and was comparable to the first quarter of 2009. Costs were attributed to the non-operating expenses at the Cerro Bayo mine, where operations were temporarily suspended during the fourth quarter of 2008.

#### Other Income and Expenses

The Company recognized $7.9 million of losses on debt extinguishments during the first quarter of 2010 from the exchange of a portion of the 3.25% Convertible Senior Notes and the 1.25% Convertible Senior Notes for shares of common stock compared to a gain of $15.7 million during the first quarter of 2009.

Fair value adjustments, net in the three months ended March 31, 2010 were $4.3 million compared to $9.2 million recorded in the first quarter of 2009. The decrease was due to mark-to-market adjustments driven by variations in gold prices related to the Franco Nevada royalty obligation and warrant, the gold lease facility, warrant to acquire the senior secured floating rate convertible notes, put and call options and forward foreign exchange contracts. See Note 13 of the consolidated financial statements, Derivative Financial Instruments and Fair of Value of Financial Instruments for further discussion.

Interest and other income in the first quarter of 2010 decreased by $0.5 million to $1.4 million compared with the first quarter of 2009. The decrease was primarily due to losses on foreign currency transactions.

Interest expense, net of capitalized interest, increased to $5.8 million in the first quarter of 2010 compared to $0.8 million in the first quarter of 2009 due to an increase in interest expense related to accretion expense for the Franco Nevada obligation, gold lease facility, capital lease obligations and other short-term borrowings. See Note 8 of the Company’s consolidated financial statements, Long-Term Debt, for further discussion. In addition, the Palmarejo mine was placed into service in April 2009, thereby decreasing capitalized interest in the first quarter of 2010.

#### Income Taxes

For the three months ended March 31, 2010, the Company reported an income tax benefit of approximately $11.5 million compared to an income tax benefit of $0.1 million in the first quarter of 2009. The following table summarizes the components of the Company’s income tax provision for the three months ended March 31, 2010 and 2009.

| Current: | Three Months Ended March 31, 2010 | 2009 |
| --- | ---: | ---: |
| United States – Alternative minimum tax | $— | $(269) |
| United States – Foreign withholding | (491) | (260) |
| Argentina | (13) | (465) |
| Australia | — | (158) |
| Mexico | (50) | (42) |
| Bolivia | 831 | — |
| Deferred: |  |  |
| United States | 1,571 | 1,549 |
| Australia | (290) | (327) |
| Bolivia | (1,423) | (4,418) |
| Chile | (343) | 339 |
| Mexico | 11,703 | 4,136 |
| Income tax benefit | $11,495 | $85 |

During the three months ended March 31, 2010, the Company recognized a current benefit in Bolivia primarily related to inflationary adjustments on non-monetary assets. Further, the Company accrued foreign withholding taxes of approximately $0.5 million on inter-company transactions between the U.S. parent and subsidiaries operating in Mexico, Argentina and Australia. Finally, the Company recognized a net $11.2 million deferred tax benefit for the recognition of deferred taxes on deductible temporary differences, foreign exchange rate adjustments and net operating loss carryforwards in various jurisdictions (principally Mexico).

During the three months ended March 31, 2009, the Company recognized a current provision in certain foreign jurisdictions. The Company accrued foreign withholding taxes of approximately $0.3 million on inter-company transactions between the U.S. parent and subsidiaries operating in Mexico, Argentina and Australia. The Company recognized a $5.7 million net deferred tax benefit for the recognition of deferred taxes on deductible temporary differences and net operating loss carryforwards in various jurisdictions (principally Mexico). In addition, the Company recognized a $4.4 million deferred tax provision in Bolivia for inflationary adjustments on non-monetary assets and unrealized foreign exchange gains on U.S. dollar-denominated liabilities in Bolivia.

#### Results of Discontinued Operations

Effective July 1, 2009, the Company completed the sale of its mineral interest in the Broken Hill mine to Perilya Broken Hill Ltd. for $55.0 million in cash. Pursuant to U.S. GAAP, Broken Hill has been reported in discontinued operations for the three month period ended March 31, 2010 and 2009. Income from discontinued operations, net of taxes, was nil during the three months ended March 31, 2010 compared to $2.2 million in the same period of 2009.

The following is a summary of the Company’s discontinued operations included in the consolidated statements of operations for the three months ended March 31, 2009 (in thousands):

|  | Three Months Ended March 31, 2009 |
| --- | ---: |
| Sales of metal | $4,709 |
| Production costs applicable to sales | (786) |
| Depreciation and depletion | (747) |
| Income tax expense | (1,503) |
| Net income from discontinued operations | $1,673 |

50

#### LIQUIDITY AND CAPITAL RESOURCES

#### Working Capital; Cash and Cash Equivalents

The Company’s working capital at March 31, 2010, increased by $42.8 million to approximately $40.2 million compared to a deficit in working capital of $2.6 million at December 31, 2009. The ratio of current assets to current liabilities was 1.2 to 1.0 at March 31, 2010 compared to .99 to 1 at December 31, 2009. The increase in working capital is primarily due to the issuance of the Company’s Senior Term Notes in February 2010.

Net cash used in operating activities in the three months ended March 31, 2010 was $9.2 million compared with net cash provided by operating activities of $3.0 million in the three months ended March 31, 2009. Excluding changes in operating assets and liabilities, the Company’s operating cash flow provided the following:

*(In Thousands)*

|  | Three Months Ended March 31, 2010 | 2009 |
| --- | ---: | ---: |
| CASH PROVIDED (USED) BY OPERATING ACTIVITIES | $(9,230) | $3,046 |
| Changes in operating assets and liabilities: |  |  |
| Receivables and other current assets | 11,287 | (2,653) |
| Inventories | 2,657 | 5,162 |
| Accounts payable and accrued liabilities | 23,000 | 1,239 |
| Operating cash flow | $27,714 | $6,794 |

A total of $48.5 million was used in investing activities in the three months ended March 31, 2010 compared to $70.4 million used in the three months ended March 31, 2009. The decrease of $21.9 million or 31.1%, is primarily due to lower capital investment activity at the Palmarejo mine which was placed into commercial production in April 2009.

The Company’s financing activities provided $90.9 million of cash during the three months ended March 31, 2010 compared to net cash provided by financing activities of $84.7 million during the three months ended March 31, 2009. The increase in net cash provided by financing activities was primarily due to cash proceeds received from the sale of $100 million Senior Term Notes due December 31, 2012, partially offset by the cash proceeds received in the first quarter of 2009, from the exercise of the warrant to purchase the Senior Secured Floating Rate Convertible Notes due 2012, and proceeds from the Franco Nevada gold production royalty.

### Liquidity

As of March 31, 2010, the Company’s cash, equivalents and short-term investments totaled $56.0 million. The Company believes that its liquidity and projected operating cashflows will be adequate to meet its obligations for at least the next twelve months. The Company plans to invest approximately $100 million in capital activities during the remainder of 2010 to complete the construction of the Palmarejo and Kensington facilities/mines and for sustaining capital investments at its existing operations.

The Company may elect to defer some capital investment activities or to secure additional capital to provide additional liquidity. In addition, if the Company decides to pursue the acquisition of additional mineral interests, new capital projects, or acquisitions of new properties, mines or companies, additional financing activities may be necessary. There can be no assurances that such financing will be available when or if needed upon acceptable terms, or at all.

### Capitalized Expenditures

During the three months ended March 31, 2010, capital expenditures totaled $47.2 million. The Company expended $16.5 million at the Palmarejo project, $29.9 million for construction and development activities at the Kensington project, $0.5 million for the development of the San Bartolomé mine and $0.2 million at the remaining sites.

### Gold Lease Facility

On December 18, 2008, the Company entered into a gold lease facility with Mitsubishi International Corporation, or MIC. Under the facility, the Company received proceeds of $20 million for the sale of 23,529 ounces of gold leased from MIC to the Company. During 2009, the Company repaid 2,000 ounces of gold and leased an additional 5,000 ounces of gold. As of March 31, 2010, the Company had 17,029 ounces of gold leased from MIC. The Company has committed to deliver this number of ounces of gold to MIC over the next four months on scheduled delivery dates. As of March 31, 2010 the Company is required to pledge certain collateral, including standby letters of credit of $2.3 million and $9.3 million of metal inventory held at its refiners. The Company accounts for the gold lease facility as a derivative instrument, which is recorded in accrued liabilities and other in the balance sheet.

#### Debt and Capital Resources

### 3.25% Convertible Senior Notes

As of March 31, 2010, the outstanding balance of the 3.25% convertible Senior Notes was $93.1 million or $79.6 million net of debt discount. The notes are unsecured and bear interest at a rate of 3.25% per year, payable on March 15 and September 15 of each year. The notes mature on March 15, 2028, unless earlier converted, redeemed or repurchased by the Company.

Each holder of the notes may require that the Company repurchase some or all of such holder’s notes on March 15, 2013, March 15, 2015, March 15, 2018 and March 15, 2023 at a repurchase price equal to 100% of the principal amount of the notes to be repurchased, plus accrued and unpaid interest, in cash, shares of common stock or a combination of cash and shares of common stock, at the Company’s election. Holders will also have the right, following certain fundamental change transactions, to require the Company to repurchase all or any part of their notes for cash at a repurchase price equal to 100% of the principal amount of the notes to be repurchased plus accrued and unpaid interest. The Company may redeem the notes for cash in whole or in part at any time on or after March 22, 2015 at 100% of the principal amount of the notes to be redeemed plus accrued and unpaid interest.

The notes provide for “net share settlement” of any conversions. Pursuant to this feature, upon conversion of the notes, the Company (1) will pay the note holder an amount in cash equal to the lesser of the conversion obligation or the principal amount of the notes and (2) will settle any excess of the conversion obligation above the notes’ principal amount in the Company’s common stock, cash or a combination thereof, at the Company’s election.

The notes are convertible under certain circumstances, as defined in the indenture agreement, at the holder’s option, at an initial conversion rate of 17.60254 shares of the Company’s common stock per $1,000 principal amount of notes, which is equivalent to an initial conversion price of approximately $56.81 per share, subject to adjustment in certain circumstances.

During the first quarter of 2010, $55.3 million of the 3.25% Convertible Senior Notes due 2028 were repurchased in exchange for 3.6 million shares of the Company’s common stock. The Company recognized a loss on the repurchase of $5.1 million.

The fair value of the notes outstanding, as determined by market transactions at March 31, 2010 and December 31, 2009, was $89.4 million and $131.3 million, respectively. The carrying value of the equity component at March 31, 2010 and December 31, 2009 was $20.9 million and $33.4 million, respectively.

At March 31, 2010 and 2009, the Company had $13.5 million and $39.7 million, respectively, of debt discount remaining and the effective interest rate on the notes was 8.9%, as a result of adopting the new accounting standard.

During the first quarters of 2010 and 2009 interest expense was $1.2 million and $1.8 million, respectively, and accretion of the debt discount was $1.4 million and $2.2 million, respectively.

### 1.25% Convertible Senior Notes

As of March 31, 2010, the Company had outstanding $1.9 million of its 1.25% Convertible Senior Notes due 2024. The remaining $1.9 million principal amount of 1.25% Convertible Notes are convertible into shares of common stock at the option of the holder on January 15, 2011, 2014, and 2019, unless previously redeemed, at an initial conversion price of $76.00 per share, subject to adjustment in certain circumstances.

The Company is required to make semi-annual interest payments. The notes are redeemable at the option of the Company before January 18, 2011, if the closing price of the Company’s common stock over a specified number of trading days has exceeded 150% of the conversion price, and anytime after January 18, 2011. Before January 18, 2011, the redemption price is equal to 100% of the principal amount of the notes, plus an amount equal to 8.75% of the principal amount of the notes, less the amount of any interest actually paid on the notes on or prior to the redemption date. The notes are due on January 15, 2024.

Each holder of the notes may require that the Company repurchase some or all of the holder’s notes on January 15, 2011, January 15, 2014 and January 15, 2019 at a repurchase price equal to 100% of the principal amount of the notes to be repurchased, plus accrued and unpaid interest, in cash, shares of common stock or a combination of cash and shares of common stock, at the Company’s election. Holders will also have the right, following certain fundamental change transactions, to require the Company to repurchase all or any part of their notes for cash at a repurchase price equal to 100% of the principal amount of the notes to be repurchased plus accrued and unpaid interest.

During the first quarter of 2010, $20.4 million of the 1.25% Convertible Senior Notes due 2024 were repurchased in exchange for 1.2 million shares of the Company’s common stock which reduced the principal amount of the notes outstanding to $1.9 million as of March 31, 2010. The Company recognized a loss on the repurchase of $1.7 million.

The fair value of the notes outstanding, as determined by market transactions on March 31, 2010 and December 31, 2009, was $1.7 million and $22.8 million, respectively.

Interest on the notes for the quarter ended March 31, 2010 was $0.01 million. Interest on the notes for the quarter ended March 31, 2009 was $0.5 million.

### Senior Term Notes due December 31, 2012

On February 5, 2010 the Company completed the sale of $100 million of Senior Term Notes due in quarterly payments through December 31, 2012. In conjunction with the sale of these notes, the Company also issued shares of its common stock valued at $4.2 million as financing costs. The principal of the Notes is payable in twelve equal quarterly installments, with the first such installment paid on March 31, 2010. The Company has the option of paying amounts due on the Notes in cash, shares of common stock or a combination of cash and shares of common stock.

The stated interest rate on the Notes is 6.50%, but the payments for principal and interest due on any payment date will be computed to give effect to recent share prices, valuing the shares of common stock at 90% of a weighted average share price over a pricing period ending shortly before the payment date. In March 2010, the Company paid $8.3 million in principal and $1.0 million in interest in exchange for 712,003 shares of the Company’s stock. The effective interest rate was approximately 13% which includes a loss of $1.0 million in connection with this quarterly debt payment, recorded in gain (loss) on debt extinguishments.

### Kensington Term Facility

On October 27, 2009 the Company entered into a term facility with Credit Suisse — Zurich of Switzerland whereby Credit Suisse will provide Coeur Alaska, a wholly-owned subsidiary of Coeur, a $45 million, five-year term facility to fund the remaining construction at the Company’s Kensington Gold Mine in Alaska. The Company began drawing down the facility during the fourth quarter of 2009. Beginning three months after an approximate twelve month grace period commencing November 2009, Coeur Alaska will repay the loan in equal quarterly payments with interest based on a margin over the three-month LIBOR rate. The facility is secured by the mineral rights and infrastructure at Kensington as well as a pledge of the shares of Coeur Alaska owned by Coeur.

As of March 31, 2010, the Company has $28.2 million outstanding bearing interest at 5.2% (three month Libor rate plus 5% margin). The Company is also subject to financial covenants including (i) guarantor tangible net worth; (ii) borrower tangible net worth; (iii) debt to equity ratio; (iv) debt service coverage ratio; and (v) maximum production cost. Events of default in the Kensington term facility include (i) a cross-default of other indebtedness; (ii) a material adverse event; (iii) loss of or failure to obtain applicable permits; or (iv) failure to achieve final completion date.

As a condition of the Kensington term facility with Credit Suisse — Zurich noted above, the Company agreed to enter into a gold hedging program which protects a minimum of 125,000 ounces of gold production over the life of the facility against the risk associated with fluctuations in the market price of gold. This program took the form of a series of zero-cost collars which consist of a floor price and a ceiling price of gold. The required collars of 125,000 ounces of gold were entered into in November and December 2009. The collars mature quarterly beginning September 2010 and conclude in December 2014. The weighted average put feature of each collar is $862.50 per ounce and the weighted average call feature of each collar is $1,688.50 per ounce.

### Bank Loans

On November 27, 2009, the Company’s wholly owned Bolivian subsidiary, Empressa Minera Manquiri, received proceeds from short-term borrowings from Banco Bisa in the amount of $5.0 million bearing interest at approximately 6.5% to fund working capital requirements. The short-term bank loan matures on November 17, 2011.

During 2008, Empressa Minera Manquiri received proceeds from short-term borrowings from Banco Bisa and Banco de Credito de Bolivia in the amount of $3.0 million to fund working capital requirements. The short-term bank loans matured and were repaid in April 2009.

During the fourth quarter of 2008, the Company’s wholly-owned Argentinean subsidiary entered into several temporary credit lines in the amount of $3.5 million with the Standard Bank of Argentina secured by a standby letter of credit by Cerro Bayo, (a wholly owned subsidiary of the Company), to fund working capital requirements. The credit lines matured and were repaid on April 13, 2009, June 30, 2009 and July 24, 2009.

### Palmarejo Gold Production Royalty Obligation

On January 21, 2009, the Company entered into a gold production royalty transaction with Franco-Nevada Corporation under which Franco-Nevada purchased a royalty covering 50% of the life of mine gold to be produced by Coeur from its Palmarejo silver and gold mine in Mexico. Coeur received total consideration of $78.0 million consisting of $75.0 million in cash, plus a warrant to acquire Franco-Nevada Common Shares (the “Franco-Nevada warrant”), which was valued at $3.0 million at closing of the Franco-Nevada transaction and is yet to be exercised. The royalty obligation is accreted to its expected value over the expected minimum payment period based on an implicit interest rate. The Company used an interest rate of 27.4% to discount the original obligation. The royalty obligation is payable in an amount equal to the greater of the minimum of 4,167 ounces of gold or 50% of actual gold production per month multiplied by the market price of gold in excess of $400 (increasing by 1% per annum beginning on the fourth anniversary of the transaction). The minimum royalty obligation commenced on July 1, 2009 and ends when payments have been made on a total of 400,000 ounces of gold. The price volatility associated with this minimum royalty obligation is considered an embedded derivative under U.S. GAAP and is described in Note 13, Derivative Financial Instruments and Fair Value of Financial Instruments, Palmarejo Gold production royalty. During the three months ended March 31, 2010, the Company paid $9.0 million of the Royalty Obligation. As of March 31, 2010 and December 31, 2009, the remaining obligation balance was $84.0 million and $84.8 million, respectively.

#### Capitalized Interest

The Company capitalizes interest incurred on its various debt instruments as a cost of properties under development. For the three months ended March 31, 2010 and 2009, the Company capitalized interest of $4.1 million and $17.7 million, respectively.

#### Off-Balance Sheet Arrangements

The Company has no off-balance sheet arrangements.

#### Recent Adopted Accounting Standards

In May 2008, the Financial Accounting Standards Board, or FASB, adopted new accounting standards related to convertible debt instruments that, by their stated terms, may be settled in cash (or other assets) upon conversion, including partial cash settlement, unless the embedded conversion option is required to be separately accounted for as a derivative. The new rules require that the liability and equity components of convertible debt instruments be separately accounted for in a manner that reflects the entity’s borrowing rate. This requires an allocation of the convertible debt proceeds between the liability component and the embedded conversion option (i.e., the equity component). The difference between the principal amount of the debt and the amount of the proceeds allocated to the liability component is reported as a debt discount and subsequently accreted as additional interest over the instrument’s expected life using the effective interest method. The new accounting standards were adopted effective January 1, 2009 and have been applied retrospectively to all periods presented. The Company determined that the provisions of the new accounting standard were applicable to the 3.25% Convertible Senior Notes. The expected life for purposes of the allocation was deemed to be five years which coincides with the initial put option date of March 15, 2013. If exercised, the Company is required to repurchase some or all of the holder’s notes in cash and/or shares at a repurchase price equal to 100% of the principal amount.

#### The Accounting Standard Codification

In June 2009, the FASB issued new accounting standards related to its accounting standards codification of the hierarchy of generally accepted accounting principles. The new standard, or Codification, is the source of authoritative U.S. GAAP to be applied by nongovernmental entities. Rules and interpretive releases of the Securities and Exchange Commission, or SEC under authority of federal securities laws are also sources of authoritative U.S. GAAP for SEC registrants. The Codification superseded non-SEC accounting and reporting standards.

All accounting literature that is not in the Codification, not issued by the SEC and not otherwise grandfathered is nonauthoritative. The new standard is effective for the Company’s interim quarterly period beginning July 1, 2009. The adoption had no impact on the Company’s consolidated financial position, results of operations or cash flows.

#### Subsequent Events

In May 2009, the FASB issued new accounting standards that established accounting and reporting standards for events that occur after the balance sheet date but before financial statements are issued or are available to be issued. The new standard sets forth (i) a period after the balance sheet date during which a reporting entity’s management should evaluate events or transactions for possible recognition or disclosure in financial statements, (ii) the circumstances under which an entity should recognize events or transactions occurring after the balance sheet in its financial statements, and (iii) the disclosures that an entity should make about events or transactions occurring after the balance sheet date in its financial statements. The Company adopted the provisions of the new accounting standards for the interim period ended June 30, 2009. The adoption had no impact on the Company’s consolidated financial position results of operations or cash flows.

#### Derivative Instruments

In March 2008, the FASB issued new accounting standards related to enhanced disclosures about how and why an entity uses derivative instruments, how derivative instruments and related hedged items are accounted for and how derivative instruments and related hedged items affect an entity’s financial position, financial performance and cash flows. The new accounting standards were adopted effective January 1, 2009 and were effective for the Company’s fiscal year, beginning January 1, 2009.

#### Equity Linked Financial Instruments

In June 2008, the Emerging Issues Task Force, or EITF, reached a consensus which clarifies the accounting treatment of an instrument (or an embedded feature) that is indexed to an entity’s own stock, which would qualify as a scope exception under U.S. GAAP. The adoption of the consensus reached by the EITF was effective for the Company’s fiscal year beginning January 1, 2009. Upon adoption, the Company determined that the bifurcated embedded conversion option in its Senior Secured Floating Rate Convertible Notes was no longer a derivative that is required to be adjusted to fair value at the end of each period. The carrying amount of the liability of $21.6 million for the conversion option was reclassified to shareholders’ equity upon adoption.

#### Risk Factors; Forward-Looking Statements

For information relating to important risks and uncertainties that could materially adversely affect the Company’s business, securities, financial condition or operating results, reference is made to the disclosure set forth under “Item 1A. Risk Factors”. In addition, because the preceding discussion includes numerous forward-looking statements relating to the Company, its results of operations and financial condition and business, reference is made to the information set forth above in “Item 1. Business” under the caption “Important Factors Relating to Forward-Looking Statements.”

#### Litigation and Other Events

For a discussion of litigation and other events, see Note 17 to the Consolidated Financial Statements of this Form 10-Q.

## Market risk

As filed, 10,622 characters.

The Company is exposed to various market risks as a part of its operations. In an effort to mitigate losses associated with these risks, the Company may, at times, enter into derivative financial instruments. These may take the form of forward sales contracts, foreign currency exchange contracts and interest rate swaps. The Company does not actively engage in the practice of trading derivative instruments for profit. This discussion of the Company’s market risk assessments contains “forward looking statements” that contain risks and uncertainties. Actual results and actions could differ materially from those discussed below.

The Company’s operating results are substantially dependent upon the world market prices of silver and gold. The Company has no control over silver and gold prices, which can fluctuate widely and are affected by numerous factors, such as supply and demand and investor sentiment. In order to mitigate some of the risk associated with these fluctuations, the Company will at times enter into forward sale contracts. The Company continually evaluates the potential benefits of engaging in these strategies based on current market conditions. The Company may be exposed to nonperformance risk by counterparties as a result of its hedging activities. This exposure would be limited to the amount that the spot price of the metal falls short of the contract price. The Company enters into contracts and other arrangements from time to time in an effort to reduce the negative effect of price changes on its cashflows. These arrangements typically consist of managing its exposure to foreign currency exchange rates and market prices associated with changes in gold and silver commodity prices. The Company may also manage price risk through the purchase of put options.

The Company enters into concentrate sales contracts with third-party smelters. The contracts, in general, provide for a provisional payment based upon provisional assays and quoted metal prices. The provisionally priced sales contracts contain an embedded derivative that is required to be separated from the host contract for accounting purposes. The host contract is the receivable from the sale of concentrates at the forward price at the time of sale. The embedded derivative, which is the final settlement price based on a future price, does not qualify for hedge accounting. These embedded derivatives are recorded as derivative assets in prepaid expenses and other or as derivative liabilities in accrued liabilities and other on the balance sheet and are adjusted to fair value through earnings each period until the date of final settlement.

At March 31, 2010, the Company had outstanding provisionally priced sales of $18.7 million, consisting of 1.0 million ounces of silver and 1,266 ounces of gold, which had a fair value of $19.3 million including the embedded derivative. For each one cent per ounce change in realized silver price, revenue would vary (plus or minus) approximately $10,000; and for each one dollar per ounce change in realized gold price, revenue would vary (plus or minus) approximately $1,300. At December 31, 2009, the Company had outstanding provisionally priced sales of $19.1 million consisting of 1.0 million ounces of silver and 1,227 ounces of gold, which had a fair value of approximately $19.1 million including the embedded derivative. For each one cent per ounce change in realized silver price, revenue would vary (plus or minus) approximately $10,000 and for each one dollar per ounce change in realized gold price, revenue would vary (plus or minus) approximately $1,200.

The Company operates, or has mining interests, in several foreign countries, specifically Australia, Bolivia, Chile, Mexico and Argentina, which exposes it to risks associated with fluctuations in the exchange rates of the currencies involved. From time to time, as part of its program to manage foreign currency risk, the Company enters into foreign currency forward exchange contracts. These contracts enable the Company to purchase a fixed amount of foreign currencies. Gains and losses on foreign exchange contracts that are related to firm commitments are designated and effective as hedges and are deferred and recognized in the same period as the related transaction. All other contracts that do not qualify as hedges are marked to market and the resulting gains or losses are recorded in income. The Company continually evaluates the potential benefits of entering into these contracts to mitigate foreign currency risk and proceeds when it believes that the exchange rates are most beneficial.

During 2009, the Company entered into forward foreign currency exchange contracts to reduce the foreign exchange risk associated with forecasted Mexican peso (“MXP”) operating costs at its Palmarejo mine. At March 31, 2010, the Company had MXP foreign exchange contracts of $18.9 million in U.S. dollars. These contracts require the Company to exchange U.S. dollars for MXP at a weighted average exchange rate of 13.76 MXP to each U.S. dollar and had a fair value of $1.8 million at March 31, 2010. The Company recorded mark-to-market gains (losses) of $0.5 million and $(3.8) million for the three months ended March 31, 2010 and 2009, respectively, which is reflected in the gain (loss) on derivatives. The Company recorded realized gains of $0.04 million and $0.4 million in production costs applicable to sales during the three months ended March 31, 2010 and 2009, respectively.

On December 18, 2008, the Company entered into a gold lease facility with MIC. Under the facility, the Company received proceeds of $20 million for the sale of 23,529 ounces of gold leased from MIC to the Company. During 2009, the Company repaid 2,000 ounces of gold and leased an additional 5,000 ounces of gold. As of March 31, 2010, the Company had 17,029 ounces of gold leased from MIC. The Company has committed to deliver this number of ounces of gold to MIC over the next four months on scheduled delivery dates. As of March 31, 2010 the Company is required to pledge certain collateral, including standby letters of credit of $2.3 million and $9.3 million of metal inventory held at its refiners. The Company accounts for the gold lease facility as a derivative instrument, which is recorded in accrued liabilities and other in the balance sheet.

As of March 31, 2010 and December 31, 2009, based on the current futures metals prices for each of the delivery dates and using a 5.06% and 5.7% discount rate, respectively, the fair value of the gold lease was a liability of $18.7 million and $28.5 million, respectively. The pre-credit risk adjusted fair value of the net derivative liability as of March 31, 2010 was $19.0 million. A credit risk adjustment of $0.3 million to the fair value of the derivative reduced the reported amount of the net derivative liability on the Company’s consolidated balance sheet to $18.7 million. For the three months ended March 31, 2010 and March 31, 2009, mark-to-market adjustments for the gold lease facility amounted to a gain of a $1.4 million and a gain of $0.1 million, respectively. The Company recorded realized losses of $2.0 and $0.2 million, respectively.

During 2009, the Company purchased silver put options to reduce the risk associated with potential decreases in the market price of silver. The cost of these put options was largely offset by proceeds received from the sale of gold call options. At March 31, 2010, the Company held put options allowing it to deliver 3.6 million ounces of silver at a weighted average strike price of $9.32 per ounce. The contracts will expire over the next six months.

At March 31, 2010, the Company also had written outstanding call options requiring it to deliver 125,000 ounces of gold at a weighted average strike price of $1,688.50 per ounce if the market price of gold exceeds the weighted average strike price. In addition, the Company had purchased outstanding put options allowing it to sell 125,000 ounces of gold at a weighted average strike price of $862.50 per ounce if the market price of gold were to fall below the strike price. The contracts will expire over the next five years. As of March 31, 2010 the fair market value of these contracts was a net liability of $1.4 million.

On January 21, 2009, the Company entered into a gold production royalty transaction with Franco-Nevada Corporation under which Franco-Nevada purchased a royalty covering 50% of the life of mine gold to be produced by the Company from its Palmarejo silver and gold mine in Mexico. The Company received total consideration of $78.0 million consisting of $75.0 million in cash, plus the Franco-Nevada warrant, which was valued at $3.0 million at closing of the Franco-Nevada transaction. The royalty obligation is payable in an amount equal to the greater of the minimum of 4,167 ounces of gold or 50% of actual gold production per month multiplied by the market price of gold in excess of $400 (increasing by 1% per annum beginning on the fourth anniversary of the transaction). The minimum royalty obligation commenced on July 1, 2009 and ends when payments have been made on a total of 400,000 ounces of gold. The 400,000 ounces of gold minimum is considered an embedded derivative financial instrument under U.S. GAAP.

The royalty obligation is accreted to its expected value over the expected minimum payment period based on the implicit interest rate. The fair value of the embedded derivative at March 31, 2010 was a liability of $79.7 million. The Franco-Nevada warrant is a contingent option to acquire 316,436 common shares of Franco-Nevada for no additional consideration, once the mine satisfies certain completion tests stipulated in the agreement. The Franco-Nevada warrant is considered a derivative instrument. The fair value of the warrant was $7.6 million at March 31, 2010. These derivative instruments are recorded in prepaid expenses and other and current or non-current royalty obligation on the balance sheet and adjusted to fair value through current earnings. During the three months ended March 31, 2010, mark-to-market adjustments for the embedded derivative and warrant amounted to a loss of $1.7 million and a gain of $1.3 million, respectively. During 2010, realized losses on settlement of the liabilities were $3.2 million. At March 31, 2010 the Company had a minimum quantity of 356,699 ounces of gold outstanding, which had a fair value of $163.7 million. For each one dollar change in gold price, the undiscounted derivative would vary (plus or minus) by approximately $0.4 million.

## Controls and procedures

As filed, 1,977 characters.

### (a) Disclosure Controls and Procedures

As of the end of the period covered by this quarterly report, the Company carried out an evaluation, under the supervision and with the participation of the Company’s management, including its Chief Executive Officer and Chief Financial Officer, of the effectiveness of the design and operation of the Company’s disclosure controls and procedures (as such term is defined in Rules 13a-15(e) and 15d-15(e) of the Securities Exchange Act of 1934 (the “Exchange Act”), and management necessarily applied its judgment in assessing the costs and benefits of such controls and procedures, which by their nature, can provide only reasonable assurance regarding management’s control objectives. The design of any system of controls is based in part upon certain assumptions about the likelihood of future events. Based upon the foregoing, the Company’s Chief Executive Officer and Chief Financial Officer concluded that the Company’s disclosure controls and procedures were effective and operating to provide reasonable assurance that information required to be disclosed by it in the reports it files or submits under the Exchange Act is recorded, processed, summarized and reported, within the time periods specified in the SEC’s rules and forms, and to provide reasonable assurance that such information is accumulated and communicated to the Company’s management, including its Chief Executive Officer and Chief Financial Officer, as appropriate, to allow timely decisions regarding required disclosure.

### (b) Changes in Internal Control over Financial Reporting

Based on an evaluation by the Company’s Chief Executive Officer and Chief Financial Officer, such officers concluded that there was no change in the Company’s internal control over financial reporting during the quarter ending March 31, 2010 that has materially affected, or is reasonably likely to materially affect, the Company’s internal control over financial reporting.

## Risk factors

As filed, 3,621 characters.

Item 1A (“Risk Factors”) of the Company’s Annual Report on Form 10-K for the year ended December 31, 2009 sets forth information relating to important risks and uncertainties that could materially adversely affect the Company’s business, financial condition or operating results.

Those risk factors continue to be relevant to an understanding of the Company’s business, financial condition and operating results. Certain of those risk factors have been updated in this Form 10-Q to provide updated information, as set forth below. References to “we,” “our” and “us” in these risk factors refer to the Company. Additional risks and uncertainties that we do not presently know or that we currently deem immaterial may also impair our business operations.

***The market prices of silver and gold are volatile. Low silver and gold prices could result in decreased revenues, decreased net income or losses and decreased cash flows, and may negatively affect our business.***

Silver and gold are commodities. Their prices fluctuate, and are affected by many factors beyond our control, including interest rates, expectations regarding inflation, speculation, currency values, governmental decisions regarding the disposal of precious metals stockpiles, global and regional demand and production, political and economic conditions and other factors. Because we currently derive approximately 68% of our revenues from continuing operations from sales of silver and 32% from gold, our earnings are primarily related to the price of these metals.

The market prices of silver (Handy & Harman) and gold (London Final) on May 6, 2010 were $17.60 per ounce and $1,185 per ounce, respectively. The prices of silver and gold may decline in the future. Factors that are generally understood to contribute to a decline in the price of silver include sales by private and government holders, and a general global economic slowdown.

If the prices of silver and gold are depressed for a sustained period and our net losses continue, we may be forced to suspend mining at one or more of our properties until the prices increase, and to record additional asset impairment write-downs. Any lost revenues, continued or increased net losses or additional asset impairment write-downs would adversely affect our financial condition and results of operations.

***High levels of violence in Mexico could affect our operations at our Palmarejo gold and silver mine.***

Our Palmarejo mine is located in Chihuahua, an area of Mexico that currently is experiencing high levels of violence. Security at our Palmarejo mine is an important consideration. High levels of violence in the area could adversely affect our ability to staff the operations at Palmarejo in an optimal fashion, to supply and operate the mine at design capacity and to deliver gold and silver to refiners.

### Our business depends on good relations with our employees.

The Company could experience labor disputes, work stoppages or other disruptions in production that could adversely affect us. As of March 31, 2010, unions represented approximately 17% of our worldwide workforce. On that date, the Company had 7 employees at its Cerro Bayo mine and 55 employees at its Martha mine who were working under a collective bargaining agreement. The agreement covering the Cerro Bayo mine expires on December 21, 2010 and a collective bargaining agreement covering the Martha mine expires on June 1, 2010. Additionally, the Company had 174 employees at its San Bartolomé mine working under a labor agreement which became effective October 11, 2007, and does not have a fixed term.