# Coeur Mining, Inc.: Form 10-Q for the period ended Jun 30, 2010

- Company: [Coeur Mining, Inc.](/companies/cde.md) (CIK 215466)
- Form: 10-Q
- Filed: 2010-08-09
- Accepted by EDGAR: Aug 9, 2010, 16:44 ET
- Period: 2010-06-30
- Accession: 0000950123-10-075098
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/215466/000095012310075098/v56700e10vq.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/215466/000095012310075098/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2010-06-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2010-04-01 to 2010-06-30 | $101.0m | us-gaap:SalesRevenueGoodsNet |
| Revenue | 6 months, 2010-01-01 to 2010-06-30 | $189.3m | us-gaap:SalesRevenueGoodsNet |
| Cost of revenue | 3 months, 2010-04-01 to 2010-06-30 | $58.6m | us-gaap:CostOfGoodsSold |
| Cost of revenue | 6 months, 2010-01-01 to 2010-06-30 | $110.4m | us-gaap:CostOfGoodsSold |
| Gross profit | 3 months, 2010-04-01 to 2010-06-30 | $12.4m | us-gaap:GrossProfit |
| Gross profit | 6 months, 2010-01-01 to 2010-06-30 | $21.2m | us-gaap:GrossProfit |
| Operating income | 3 months, 2010-04-01 to 2010-06-30 | $1.9m | us-gaap:OperatingIncomeLoss |
| Operating income | 6 months, 2010-01-01 to 2010-06-30 | $1.0m | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2010-04-01 to 2010-06-30 | $5.6m | us-gaap:InterestExpense |
| Interest expense | 6 months, 2010-01-01 to 2010-06-30 | $11.5m | us-gaap:InterestExpense |
| Income tax | 3 months, 2010-04-01 to 2010-06-30 | −$9.4m | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 6 months, 2010-01-01 to 2010-06-30 | −$21.2m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2010-04-01 to 2010-06-30 | −$50.7m | us-gaap:NetIncomeLoss |
| Net income | 6 months, 2010-01-01 to 2010-06-30 | −$58.8m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2010-04-01 to 2010-06-30 | −$0.57 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 6 months, 2010-01-01 to 2010-06-30 | −$0.69 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2010-04-01 to 2010-06-30 | −$0.57 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 6 months, 2010-01-01 to 2010-06-30 | −$0.69 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2010-04-01 to 2010-06-30 | 88,501,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 6 months, 2010-01-01 to 2010-06-30 | 85,145,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months, 2010-04-01 to 2010-06-30 | $32.5m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Operating cash flow | 6 months, 2010-01-01 to 2010-06-30 | $23.2m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 3 months, 2010-04-01 to 2010-06-30 | $45.5m | us-gaap:PaymentsToAcquireProductiveAssets |
| Capital expenditure | 6 months, 2010-01-01 to 2010-06-30 | $92.7m | us-gaap:PaymentsToAcquireProductiveAssets |
| Cash and equivalents | at 2010-06-30 | $41.2m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2010-06-30 | $246.9m | us-gaap:AssetsCurrent |
| Total assets | at 2010-06-30 | $3.15bn | us-gaap:Assets |
| Current liabilities | at 2010-06-30 | $243.9m | us-gaap:LiabilitiesCurrent |
| Current portion of debt | at 2010-06-30 | $61.8m | us-gaap:DebtCurrent |
| Shareholders' equity | at 2010-06-30 | $2.07bn | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 94,051 characters.

Management’s Discussion and Analysis of Financial Condition and Results of Operations (“MD&A”) is designed to provide a reader of our financial statements with a narrative from management’s perspective on our financial condition, results of operations, liquidity and other factors that may affect our future results. We believe it is important to read our MD&A in conjunction with our Annual Report on Form 10-K for the year ended December 31, 2009, as well as other publicly available information.

This report contains numerous forward-looking statements relating to the Company’s gold and silver mining business, including estimated production data, expected operating schedules, expected capital costs and other operating data and permit and other regulatory approvals. Such forward-looking statements are identified by the use of words such as “believes,” “intends,” “expects,” “hopes,” “may,” “should,” “will,” “plan,” “projected,” “contemplates,” “anticipates” or similar words. Actual production, operating schedules, results of operations, ore reserve and resource estimates and other projections and estimates could differ materially from those projected in the forward-looking statements. The important factors that could cause actual results to differ materially from those in the forward-looking statements include (i) the risk factors set forth below under Part II, Item 1A, (ii) risks and hazards inherent in the mining business (including environmental hazards, industrial accidents, weather or geologically related conditions), (iii) changes in the market prices of gold and silver, (iv) uncertainties inherent in the Company’s production, exploratory and developmental activities, including risks relating to permitting and regulatory delays, (v) any future labor disputes or work stoppages, (vi) uncertainties inherent in the estimation of gold and silver ore reserves, (vii) changes resulting from the Company’s future acquisition of new mining properties or businesses, (viii) reliance on third parties to operate certain mines where the Company owns silver production and reserves, (ix) the loss of any third-party smelter to which the Company markets silver and gold, (x) effects of environmental and other governmental regulations, (xi) risks inherent in the ownership or operation of or investment in mining properties or businesses in foreign countries, (xii) the worldwide economic downturn and difficult conditions in the global capital and credit markets, and (xiii) the Company’s ability to raise additional financing necessary to conduct its business, make payments or refinance its debt. Readers are cautioned not to put undue reliance on forward-looking statements. The Company disclaims any intent or obligation to update publicly these forward-looking statements, whether as a result of new information, future events or otherwise.

MD&A includes references to total cash operating costs and cash costs per ounce of silver produced both on an individual mine basis and on a consolidated basis. Total cash operating costs per ounce and cash costs per ounce are measurements that management uses to monitor and evaluate the performance of its mining operations and is not a measurement calculated under U.S. GAAP. A reconciliation of total cash operating costs and cash costs per ounce to production expenses, which is calculated under U.S. GAAP, is also provided in the section titled “Operating Statistics” herein and should be referred to when reading the total cash costs per ounce measurement.

#### Introduction to the Company

The Company is a large primary silver producer with growing gold production and has assets located in the United States, Mexico, Bolivia, Argentina and Australia. The Palmarejo mine, San Bartolomé mine, Rochester mine and Martha mine, each of which is operated by the Company, and the Endeavor mine, which is operated by a non-affiliated party, constituted the Company’s principal sources of mining revenues during the first half of 2010. The Kensington mine, the Company’s newest operating mine, began production in June 2010. Coeur is an Idaho corporation incorporated in 1928.

The Company’s business strategy is to discover, acquire, develop and operate low-cost silver and gold operations that will produce long-term cashflow, provide opportunities for growth through continued exploration, and generate superior and sustainable returns for shareholders. The Company’s management focuses on maximizing cash flow from its existing operations, the main elements of which are silver and gold prices, cash costs of production and capital expenditures. The Company also focuses on reducing its non-operating costs in order to maximize cashflow.

The results of the Company’s operations are significantly affected by fluctuation in prices of silver and gold, which may fluctuate widely and are affected by numerous factors beyond our control, including interest rates, expectations regarding inflation, currency values, governmental decisions regarding the disposal of precious metals stockpiles, global and regional political and economic conditions and other factors. In addition, we face challenges including raising capital, increasing production and managing social, political and environmental issues. Operating costs at our mines are subject to variation due to a number of factors such as changing commodity prices, ore grades, metallurgy, revisions to mine plans and changes in accounting principles. At foreign locations, operating costs are also influenced by currency fluctuations that may affect our U.S. dollar costs.

### Overview of Performance

### Production

The Company’s total gold and silver production in the second quarter of 2010 increased compared to the first quarter of 2010 and the second quarter of 2009. In the second quarter of 2010, the Company’s silver production increased 277,983 ounces, or 7.2%, to 4.2 million ounces, as compared to 3.9 million ounces in the comparable period in 2009. The Company’s gold production in the second quarter of 2010 increased 9,329, or 67.6%, to 23,124 ounces, as compared to 13,795 ounces in the comparable period in 2009. The increase was driven by the Palmarejo mine which operated at full capacity during the second quarter of 2010.

### Metal Prices

Sales of metal increased $33.1 million, or 48.9%, to $101.0 million in the second quarter of 2010, compared to $67.9 million in the second quarter of 2009, primarily due to the significant rise in gold production from the Palmarejo mine and from substantially higher average realized silver and gold prices. Similarly, sales of metal increased $78.1 million for the first six months of 2010 to $189.3 million, as compared to $111.2 million in the comparable period of 2009. The Company’s average realized silver and gold prices during the second quarter were $18.56 per ounce and $1,176 per ounce, respectively, representing increases of 35.4% and 25.6% over last year’s second quarter. Silver production contributed 72.6% of the Company’s total metal sales during the second quarter, compared to 83.8% during the second quarter of 2009.

### Earnings

The Company reported operating income of $1.9 million and $1.0 million for the three months and six months, respectively, ended June 30, 2010. However, the Company reported a net loss of $50.7 million, or $(0.57) per share, for the three months ended June 30, 2010 and a net loss of $58.8 million, or $(0.69) per share, for the six months ended June 30, 2010. The net losses reflect $42.5 million and $46.8 million, respectively, of fair value adjustments, which were driven primarily by higher gold prices related to the Franco-Nevada royalty obligation and warrant, the Mitsubishi gold lease facility, put and call options and forward foreign exchange contracts.

In comparison, the Company had operating losses of $8.8 million and $8.5 million during the three months and six months, respectively, ended June 30, 2009. However, the Company reported net income of $11.6 million, or $0.17 per share, for the three months ended June 30, 2009 and $17.7 million, or $0.27 per share, for the six months ended June 30, 2009. The net income reflects $22.7 million and $38.4 million, respectively, of gains on debt extinguishments. The operating losses reported in the comparable periods of 2009 reflected lower realized silver and gold prices and higher operating costs at the Palmarejo mine as the mine was transitioning into production.

### Other Highlights

In addition to the matters discussed above regarding the key elements of the Company’s business strategy, the most important matters management considers in evaluating the Company’s financial condition and results of operations include:

- The average price of silver (Handy & Harman) and gold (London Final) for the six months ended June 30, 2010 was $17.66 and $1,152.22 per ounce, respectively. The market price of silver and gold on August 6, 2010 was $18.51 per ounce and $1,207.75 per ounce, respectively.
- The Company owns 100% of Coeur Mexicana S.A. de C.V., a Mexican company that operates the underground and surface Palmarejo silver and gold mine in Mexico. The Palmarejo mine poured its first silver/gold doré on March 30, 2009 and began shipping doré on April 16, 2009. During the six months ended June 30, 2010 Palmarejo produced 2.4 million ounces of silver and 42,527 ounces of gold.
- The Company owns 100% of Empresa Minera Manquiri S.A., a Bolivian company that controls the mining rights to the San Bartolomé mine, a surface silver mine in Bolivia where commercial production commenced in June 2008. San Bartolomé produced 1.9 million ounces of silver during the second quarter of 2010, a 79.2% increase compared to the first quarter. San Bartolomé began mining higher grade material located in the Huacajchi deposit above the 4,400 meter level under its agreement with the Cooperative Reserva Fiscal. The Huacajchi was confirmed to be excluded from the October 2009 resolution restricting mining above the 4,400 meter level of Cerro Rico Mountain. See discussion under Operating Highlights and Statistics, South American Operations, San Bartolomé for further details.
- The Company owns 100% of Coeur Alaska, Inc. (“Coeur Alaska”), which owns the Kensington property, north of Juneau, Alaska, which began processing ore on June 24, 2010 and commercial production commenced effective July 3, 2010.
- The Company owns 100% of Coeur Rochester, Inc., which operated the Rochester mine, a silver and gold surface mine located in northwestern Nevada, since 1986. The active mining of ore at the Rochester mine ceased in 2007; however, silver and gold production is expected to continue through 2014 as a result of continuing heap leaching operations. During 2009, the Company completed a technical and economic evaluation of the continuation of mining operations at its Rochester mine. This study envisions an average of 2.5 million ounces of incremental annual silver production and 30,000 ounces of annual gold production through 2017. The Company expects to complete the permitting necessary for construction of facilities this year to restart active mining in 2011. Rochester produced 1.1 million ounces of silver and 5,306 ounces of gold in the first half of 2010.
- The Company owns 100% of Coeur Argentina S.R.L., an Argentine company that owns and operates the underground high-grade silver and gold Martha mine in Santa Cruz, Argentina. During the first half of 2010, Martha produced 915,111 ounces of silver. Due to depletion of the ore reserve at the Martha mine, the Company expects operating activities will cease in late 2010 unless additional mineralization is discovered during the year. In addition, the Company is pursuing strategic alternatives at Martha.

Coeur also has interests in other properties that are subject to silver or gold exploration activities upon which no minable ore reserves have yet been delineated.

### Operating Highlights and Statistics

### South American Operations

San Bartolomé Mine:

Silver production for the second quarter of 2010 was 1.9 million ounces of silver or 79.2% higher than the first quarter of 2010 and was comparable to production during the second quarter of 2009. Total cash operating costs per ounce during the second quarter of 2010 were $7.78 and total cash costs per ounce, including royalties and taxes, were $8.32, compared to $9.98 and $10.84 respectively, in the first quarter of 2010 and $7.37 and $10.64, respectively, during the second quarter of 2009. The significant increase in production and decline in costs compared to the first quarter of 2010 was due to process handling improvements and the resumed mining of higher grade material located in the Huacajchi deposit which was confirmed to be excluded from the October 2009 resolution restricting mining above the 4,400 meter level of the Cerro Rico Mountain.

Silver production for the first six months of 2010 was 2.9 million ounces of silver compared to 4.0 million ounces in the six months ended June 30, 2009. Cash operating costs per ounce in the first half of 2010 were $8.57 and total cash costs per ounce were $9.22, compared to $7.04 and $9.35, respectively, in the six months ended June 30, 2009. Lower production and higher costs per ounce in the first half of 2010 compared to the first half of 2009 were due to the temporary suspension of mining above the 4,400 level of the Cerro Rico Mountain which was mandated in October 2009 as discussed below.

On October 14, 2009, the Bolivian state-owned mining organization, (COMIBOL), announced by resolution its temporary suspension of mining activities above the elevation of 4,400 meters above sea level while stability studies of Cerro Rico Mountain are undertaken. Cerro Rico Mountain is a historic mining area that has been the subject of centuries of unregulated underground mining by numerous groups and individuals. The Company holds rights to mine above this elevation under valid contracts backed by Supreme Decree with COMIBOL as well as contracts with local mining cooperatives that hold their rights through COMIBOL. The Company has told COMIBOL that it will temporarily adjust its mine plan to confine its activities to the ore deposits below 4,400 meters above sea level. San Bartolomé has begun mining operations in high grade material located in the Huacajchi deposit above the 4,400 meter level under its agreement with the Cooperative Reserva Fiscal. The Huacajchi deposit was confirmed to be excluded from the October 2009 resolution restricting mining above the 4,400 meter level of Cerro Rico Mountain. Access to the Huacajchi deposit and its higher grade material is having beneficial impact on production and cost at the mine. Other mining areas above the 4,400 meter level continue to be temporarily suspended while stability studies of Cerro Rico Mountain are under taken by COMIBOL, the state owned mining organization. The Company does not use explosives in its surface-only mining activities and is sensitive to the preservation of the mountain under its contracts with the state-owned mining entity and the local cooperatives. It is uncertain at this time how long the temporary suspension will remain in place.

Martha Mine:

Silver production decreased 22.3% to 549,885 ounces in the second quarter of 2010 compared to 707,898 ounces in the second quarter of 2009. Total cash operating costs per ounce in the second quarter of 2010 were $8.97 and total cash costs per ounce, including royalties and taxes, were $9.57, as compared to $7.89 and $8.33, respectively, during the second quarter of 2009. The decrease in silver production were primarily due to a 54.2% decrease in tons milled offset by a 77.5% increase in the average silver grade.

Silver production was 915,111 ounces in the six months ended June 30, 2010 compared to 1.5 million ounces in the six months ended June 30, 2009. Total cash operating costs per ounce in the first half of 2010 was $11.57 and total cash costs, including royalties and taxes, were $12.12, compared to $6.74 and $7.20, respectively, during the first half of 2009. The decrease in silver production and increase in total cash costs per ounce was primarily due to the 45.4% decrease in tons milled. The Company expects active mining operations will cease in late 2010 unless additional mineralization is discovered during the year. In addition, the Company is pursuing strategic alternatives at Martha.

### North American Operations

Palmarejo Mine:

The Palmarejo Mine commenced commercial production on April 20, 2009. Palmarejo contributed 44% of the company’s metal sales during the second quarter of 2010. The Company completed a substantial amount of test work during the first half of the year and is continuing to pursue additional opportunities to improve silver recovery rates at Palmarejo. Many important milestones were achieved during the second quarter, which are expected to result in higher production and lower costs during the remainder of 2010. These milestones include:

- Commissioning of Merrill Crowe refining plant during June to supplement existing electrowinning plant
- June commencement of mining of higher-grade ore from underground production stopes versus ore from development activities
- Improved ore sorting and blending procedures from the various distinct ore types at Palmarejo

Silver recoveries remained flat during the second quarter of 2010 compared to the first quarter of 2010. Production during the second quarter of 2010 was 1.1 million ounces of silver and 19,950 ounces of gold an increase of 82.2% and 105.0%, respectively, compared to the second quarter of 2009. Cash operating costs and total cash costs during the second quarter decreased by 44.5% to $10.78 per ounce compared to the second quarter of 2009. The increase in production levels are primarily due to a 60.4% increase in tons milled, and increases of 35.3% in silver recoveries and 13.4% in gold recoveries as compared to last year’s second quarter, which was the mines initial, startup quarter. The Company is in early stages of implementing conclusions from recent test work and expects to see continued improvement through the remainder of the year. During the month of July, Palmarejo produced 488,600 ounces of silver and 9,300 ounces of gold, representing monthly increases of 60.9% and 50.9%, respectively. These improvements are a result of recently commenced mining of higher-grade underground ore as well as improved ore blending procedures.

Silver production at the Palmarejo Mine in the six months ended June 30, 2010, was 2.4 million ounces and gold production was 42,527, compared to 0.6 million ounces of silver and 9,730 ounces of gold in the six months ended June 30, 2009. Cash operating cost and total cash costs per ounce were $7.83 compared to $19.44 in the six months ended June 30, 2009. The increase in production and decrease in cash costs per ounce were primarily attributed to a 221.0% increase in tons milled, a 35.4% increase in silver recoveries and a 16.1% increase in gold recoveries as compared to the same period last year which was a partial year of operating activities.

Rochester Mine:

Production was 533,093 ounces of silver and 2,616 ounces of gold during the second quarter of 2010 compared to 543,543 ounces of silver and 3,231 ounces of gold in the second quarter of 2009. Production was lower due to continued leach down of the ore on leach pad along with the lack of incremental ore production. Total cash operating costs per ounce in the second quarter of 2010 were $2.44 and total cash costs per ounce, including production taxes, were $2.93 in the second quarter of 2010 as compared to total cash operating costs per ounce of $2.50 and total cash costs per ounce of $2.96 in the second quarter of 2009. The decrease in total cash cost per ounce was primarily due to an increase in by-product credits related to increases in gold prices as compared to the second quarter of 2009.

Production at the Rochester mine in the six months ended June 30, 2010, was 1.1 million ounces of silver and 5,306 ounces of gold, compared to 1.0 million ounces of silver and 6,049 ounces of gold in the six months ended June 30, 2009. Cash operating costs per ounce were $2.06 and total cash cost which include production taxes were $2.64, compared to $2.64 and $3.14, respectively, in the six months ending June 30, 2009. The decrease in cash costs per ounce was primarily due to an increase in by-product credits related to increases in gold prices as compared to the six months ended June 30, 2009.

The Company completed a study regarding continuation of active mining operations and is working towards a resumption of active mining at the Rochester mine in 2011.

### Australia Operations

Endeavor Mine:

Silver production at the Endeavor mine in the second quarter of 2010 was 139,447 ounces compared to 122,705 ounces in the second quarter of 2009. The increase in silver production was primarily due to a 9.6% increase in tons milled and a 4.7% increase in ore grades compared to the second quarter of 2009. Total cash costs per ounce of silver produced were $8.98 in the second quarter of 2010 compared to $6.19 in the second quarter of 2009. The increase in total cash cost per ounce was primarily due to the price participation component terms of the transaction. Under the terms of the price participation component, CDE Australia Pty. Ltd, a subsidiary of the Company, pays an additional operating cost contribution of 50% of the amount by which the silver price exceeds $7.00 per ounce.

Silver production in the six months ended June 30, 2010 was 343,700 ounces compared to 264,519 ounces in the six months ended June 30, 2009. The increase in silver production was due to a 72.8% increase in ore grades partially offset by an 8.3% decrease in tons milled compared to the first half of 2009. Total cash costs per ounce were $8.04 in the first half of 2010 compared to $5.52 in the first half of 2009. The increase in total cash costs per ounce was primarily due to the price participation component terms described above.

As of June 30, 2010, CDE Australia Pty Ltd had recovered approximately 57% of the transaction consideration consisting of 2.8 million payable ounces, or 14% of the 20 million maximum payable silver ounces to which CDE Australia Pty Ltd is entitled under the terms of the silver sale and purchase agreement. No assurances can be made that the mine will achieve its 20.0 million payable silver ounce maximum.

### Operating Statistics from Continuing Operations

The following table presents information by mine and consolidated sales information for the three and six month periods ended June 30, 2010 and 2009:

| Palmarejo (A) | Three Months Ended June 30, 2010 | 2009 | Six Months Ended June 30, 2010 | 2009 |
| --- | ---: | ---: | ---: | ---: |
| Tons milled | 457,268 | 285,095 | 915,275 | 285,095 |
| Ore grade/Ag oz | 3.23 | 3.84 | 3.57 | 3.84 |
| Ore grade/Au oz | 0.05 | 0.04 | 0.05 | 0.04 |
| Recovery/Ag oz | 72.5% | 53.6% | 72.6% | 53.6% |
| Recovery/Au oz | 87.3% | 77.0% | 89.4% | 77.0% |
| Silver production ounces | 1,070,638 | 587,716 | 2,371,231 | 587,716 |
| Gold production ounces | 19,950 | 9,730 | 42,527 | 9,730 |
| Cash operating costs/oz | $10.78 | $19.44 | $7.83 | $19.44 |
| Cash cost/oz | $10.78 | $19.44 | $7.83 | $19.44 |
| Total production cost/oz | $29.73 | $40.50 | $25.16 | $40.50 |
| **San Bartolomé** |  |  |  |  |
| Tons milled | 446,909 | 352,938 | 740,014 | 716,717 |
| Ore grade/Ag oz | 5.00 | 6.10 | 4.50 | 6.46 |
| Recovery/Ag oz | 83.4% | 89.0% | 87.2% | 87.1% |
| Silver production ounces | 1,863,141 | 1,916,359 | 2,903,068 | 4,029,910 |
| Cash operating costs/oz | $7.78 | $7.37 | $8.57 | $7.04 |
| Cash cost/oz | $8.32 | $10.64 | $9.22 | $9.35 |
| Total production cost/oz | $11.56 | $13.13 | $12.39 | $11.82 |
| **Martha Mine** |  |  |  |  |
| Tons milled | 12,421 | 27,097 | 29,996 | 54,914 |
| Ore grade/Ag oz | 50.24 | 28.31 | 35.21 | 30.02 |
| Ore grade/Au oz | 0.06 | 0.04 | 0.04 | 0.04 |
| Recovery/Ag oz | 88.1% | 92.3% | 86.6% | 91.9% |
| Recovery/Au oz | 81.7% | 83.4% | 89.5% | 83.9% |
| Silver production ounces | 549,885 | 707,898 | 915,111 | 1,515,905 |
| Gold production ounces | 558 | 834 | 1,074 | 1,807 |
| Cash operating costs/oz | $8.97 | $7.89 | $11.57 | $6.74 |
| Cash cost/oz | $9.57 | $8.33 | $12.12 | $7.20 |
| Total production cost/oz | $14.10 | $10.03 | $17.38 | $8.74 |
| Rochester (B) |  |  |  |  |
| Silver production ounces | 533,093 | 543,543 | 1,055,253 | 1,013,404 |
| Gold production ounces | 2,616 | 3,231 | 5,306 | 6,049 |
| Cash operating costs/oz | $2.44 | $2.50 | $2.06 | $2.64 |
| Cash cost/oz | $2.93 | $2.96 | $2.64 | $3.14 |
| Total production cost/oz | $3.97 | $3.90 | $3.67 | $4.14 |
| **Endeavor** |  |  |  |  |
| Tons milled | 143,371 | 130,872 | 273,244 | 297,843 |
| Ore grade/Ag oz | 2.01 | 1.92 | 2.61 | 1.51 |
| Recovery/Ag oz | 48.4% | 48.7% | 48.2% | 58.8% |
| Silver production ounces | 139,447 | 122,705 | 343,700 | 264,519 |
| Cash operating costs/oz | $8.98 | $6.19 | $8.04 | $5.52 |
| Cash cost/oz | $8.98 | $6.19 | $8.04 | $5.52 |
| Total production cost/oz | $12.21 | $8.76 | $11.27 | $8.09 |
| CONSOLIDATED PRODUCTION TOTALS (C) |  |  |  |  |
| Silver ounces | 4,156,204 | 3,878,221 | 7,588,363 | 7,411,454 |
| Gold ounces | 23,124 | 13,795 | 48,907 | 17,586 |
| Cash operating costs/oz | $8.06 | $8.57 | $7.77 | $7.31 |
| Cash cost per oz/silver | $8.44 | $10.33 | $8.17 | $8.72 |
| Total production cost/oz | $15.62 | $15.28 | $15.72 | $12.28 |
| CONSOLIDATED SALES TOTALS (D) |  |  |  |  |
| Silver ounces sold | 4,051,838 | 4,318,092 | 7,685,594 | 7,489,069 |
| Gold ounces sold | 23,645 | 11,816 | 49,379 | 15,941 |
| Realized price per silver ounce | $18.56 | $13.71 | $17.74 | $13.22 |
| Realized price per gold ounce | $1,176.09 | $936.53 | $1,138.51 | $933.72 |

(A) Palmarejo achieved commercial production on April 20, 2009.

|  |  |
| --- | --- |
| (B) | The leach cycle at Rochester requires 5 to 10 years to recover gold and silver contained in the ore. The Company estimates the ultimate recovery to be approximately 61.5% for silver and 93% for gold. However, ultimate recoveries will not be known until leaching operations cease, which is currently estimated for 2014. Current recovery may vary significantly from ultimate recovery. See Critical Accounting Policies and Estimates – Ore on Leach Pad. |
| (C) | Current production ounces and recoveries reflect final metal settlements of previously reported production ounces. |
| (D) | Units sold at realized metal prices will not match reported metal sales due primarily to the effects on revenues of mark-to-market adjustments on embedded derivatives in the Company’s provisionally priced sales contracts. |
|  | “Operating Costs per Ounce” and “Cash Costs per Ounce” are calculated by dividing the operating cash costs and cash costs computed for each of the Company’s mining properties for a specified period by the amount of gold ounces or silver ounces produced by that property during that same period. Management uses cash operating costs per ounce and cash costs per ounce as key indicators of the profitability of each of its mining properties. Gold and silver are sold and priced in the world financial markets on a U.S. dollar per ounce basis. |
|  | “Cash Operating Costs” and “Cash Costs” are costs directly related to the physical activities of producing silver and gold, and include mining, processing and other plant costs, third-party refining and smelting costs, marketing expenses, on-site general and administrative costs, royalties, in-mine drilling expenditures related to production and other direct costs. Sales of by-product metals are deducted from the above in computing cash costs. Cash costs exclude depreciation, depletion and amortization, accretion, corporate general and administrative expenses, exploration, interest, and pre-feasibility costs. Cash operating costs include all cash costs except production taxes and royalties, if applicable. Cash costs are calculated and presented using the “Gold Institute Production Cost Standard” applied consistently for all periods presented. |
|  | Total operating costs and cash costs per ounce are non-U.S. GAAP measures and investors are cautioned not to place undue reliance on them and are urged to read all U.S. GAAP accounting disclosures presented in the consolidated financial statements and accompanying footnotes. In addition, see the reconciliation of “cash costs” to production costs under “Reconciliation of Non-U.S. GAAP Cash Costs to U.S. GAAP Production Costs” set forth below. |

The following tables present a reconciliation between non-U.S. GAAP cash operating costs per ounce and cash costs per ounce to production costs applicable to sales including depreciation, depletion and amortization, which are calculated in accordance with U.S. GAAP:

### Reconciliation of Non-U.S. GAAP Cash Costs to U.S. GAAP Production Costs

### Three months ended June 30, 2010

*(In thousands except ounces and per ounce costs)*

|  | Palmarejo | San Bartolomé | Martha | Rochester | Endeavor | Total |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Production of silver (ounces) | 1,070,638 | 1,863,142 | 549,885 | 533,094 | 139,447 | 4,156,206 |
| Cash operating cost per ounce | $10.78 | $7.78 | $8.97 | $2.44 | $8.98 | $8.06 |
| Cash costs per ounce | $10.78 | $8.32 | $9.57 | $2.93 | $8.98 | $8.44 |
| Total Operating Cost (Non-U.S. GAAP) | $11,542 | $14,490 | $4,937 | $1,298 | $1,252 | $33,519 |
| Royalties | — | 999 | 329 | — | — | 1,328 |
| Production taxes | — | — | — | 260 | — | 260 |
| Total Cash Costs (Non-U.S. GAAP) | 11,542 | 15,489 | 5,266 | 1,558 | 1,252 | 35,107 |
| Add/Subtract: |  |  |  |  |  |  |
| Third party smelting costs | — | — | (1,133) | — | (346) | (1,479) |
| By-product credit | 23,846 | — | 666 | 3,131 | — | 27,643 |
| Other adjustments | — | — | 253 | 95 | — | 348 |
| Change in inventory | (3,289) | (148) | (920) | 811 | 517 | (3,029) |
| Depreciation, depletion and amortization | 20,289 | 6,032 | 2,236 | 458 | 450 | 29,465 |
| Production costs applicable to sales, including depreciation, depletion and amortization (U.S. GAAP) | $52,388 | $21,373 | $6,368 | $6,053 | $1,873 | $88,055 |

47

### Six months ended June 30, 2010

*(In thousands except ounces and per ounce costs)*

|  | Palmarejo | San Bartolomé | Martha | Rochester | Endeavor | Total |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Production of silver (ounces) | 2,371,231 | 2,903,068 | 915,111 | 1,055,253 | 343,700 | 7,588,363 |
| Cash operating cost per ounce | $7.83 | $8.57 | $11.57 | $2.06 | $8.04 | $7.77 |
| Cash costs per ounce | $7.83 | $9.22 | $12.12 | $2.64 | $8.04 | $8.17 |
| Total Operating Cost (Non-U.S. GAAP) | $18,572 | $24,869 | $10,585 | $2,175 | $2,764 | $58,965 |
| Royalties | — | 1,891 | 506 | — | — | 2,397 |
| Production taxes | — | — | — | 608 | — | 608 |
| Total Cash Costs (Non-U.S. GAAP) | 18,572 | 26,760 | 11,091 | 2,783 | 2,764 | 61,970 |
| Add/Subtract: |  |  |  |  |  |  |
| Third party smelting costs | — | — | (1,826) | — | (610) | (2,436) |
| By-product credit | 48,891 | — | 1,237 | 6,119 | — | 56,247 |
| Other adjustments | — | — | 259 | 163 | — | 422 |
| Change in inventory | (6,697) | (2,016) | 697 | 2,318 | (112) | (5,810) |
| Depreciation, depletion and amortization | 41,083 | 9,209 | 4,553 | 923 | 1,110 | 56,878 |
| Production costs applicable to sales, including depreciation, depletion and amortization (U.S. GAAP) | $101,849 | $33,953 | $16,011 | $12,306 | $3,152 | $167,271 |

### Three months ended June 30, 2009

*(In thousands except ounces and per ounce costs)*

|  | Palmarejo | San Bartolomé | Martha | Rochester | Endeavor | Total |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Production of silver (ounces) | 587,716 | 1,916,359 | 707,898 | 543,543 | 122,705 | 3,878,221 |
| Cash operating cost per ounce | $19.44 | $7.37 | $7.89 | $2.50 | $6.19 | $8.57 |
| Cash costs per ounce | $19.44 | $10.64 | $8.33 | $2.96 | $6.19 | $10.33 |
| Total Operating Cost (Non-U.S. GAAP) | $11,423 | $14,119 | $5,587 | $1,358 | $760 | $33,247 |
| Royalties | — | 6,277 | 307 | — | — | 6,584 |
| Production taxes | — | — | — | 249 | — | 249 |
| Total Cash Costs (Non-U.S. GAAP) | 11,423 | 20,396 | 5,894 | 1,607 | 760 | 40,080 |
| Add/Subtract: |  |  |  |  |  |  |
| Third party smelting costs | — | — | (1,379) | — | (262) | (1,641) |
| By-product credit | 9,101 | — | 772 | 2,974 | — | 12,847 |
| Other adjustments | — | — | 167 | 53 | — | 220 |
| Change in inventory | (6,854) | 1,850 | 634 | 1,506 | (25) | (2,889) |
| Depreciation, depletion and amortization | 12,380 | 4,774 | 1,034 | 457 | 316 | 18,961 |
| Production costs applicable to sales, including depreciation, depletion and amortization (U.S. GAAP) | $26,050 | $27,020 | $7,122 | $6,597 | $789 | $67,578 |

48

### Six months ended June 30, 2009

*(In thousands except ounces and per ounce costs)*

|  | Palmarejo | San Bartolomé | Martha | Rochester | Endeavor | Total |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Production of silver (ounces) | 587,716 | 4,029,910 | 1,515,905 | 1,013,404 | 264,519 | 7,411,454 |
| Cash operating cost per ounce | $19.44 | $7.04 | $6.74 | $2.64 | $5.52 | $7.31 |
| Cash costs per ounce | $19.44 | $9.35 | $7.20 | $3.14 | $5.52 | $8.72 |
| Total Operating Cost (Non-U.S. GAAP) | $11,423 | $28,366 | $10,223 | $2,684 | $1,460 | $54,156 |
| Royalties | — | 9,302 | 691 | — | — | 9,993 |
| Production taxes | — | — | — | 503 | — | 503 |
| Total Cash Costs (Non-U.S. GAAP) | 11,423 | 37,668 | 10,914 | 3,187 | 1,460 | 64,652 |
| Add/Subtract: |  |  |  |  |  |  |
| Third party smelting costs | — | — | (2,846) | — | (534) | (3,380) |
| By-product credit | 9,101 | — | 1,655 | 5,531 | — | 16,287 |
| Other adjustments | — | 7 | 167 | 88 | — | 262 |
| Change in inventory | (6,853) | (241) | 669 | 2,040 | (97) | (4,482) |
| Depreciation, depletion and amortization | 12,380 | 9,947 | 2,174 | 927 | 681 | 26,109 |
| Production costs applicable to sales, including depreciation, depletion and amortization (U.S. GAAP) | $26,051 | $47,381 | $12,733 | $11,773 | $1,510 | $99,448 |

### Exploration Activity

In the three and six months ending June 30, 2010, the Company spent approximately $4.0 million and $7.8 million respectively, on its global exploration program. The majority of this was devoted to exploration at the Company’s Palmarejo, Martha and Kensington properties.

#### Palmarejo (Mexico)

The Company spent a total of $2.1 million on exploration at the Palmarejo District during the three months ending June 30, 2010 to discover new silver and gold mineralization and define new ore reserves.

This exploration work concentrated primarily on drilling around the Palmarejo mine from both surface and underground platforms. A total of 12,359 meters (40,458 feet) of core drill was completed in the second quarter of 2010 in this program in an effort to discover new mineralization at the mine and expand ore reserves. In addition drilling recommenced in the north end of the long Guadalupe mineral system in the Palmarejo District where a total of 7,420 meters (24,344 feet) of core drill was completed in the second quarter.

#### Kensington (USA)

Exploration at Kensington consisted of mapping, sampling, and commencing core drilling in an effort to discover new mineralization and expand ore reserves. The main focus for this drilling was on the Horrible structure, a prominent, gold-bearing quartz vein and vein swarm situated about 650 meters west of the current Kensington mining area. A total of 9,941 feet (3,030 meters) of core drilling was completed at Horrible and a total of $0.2 million was spent on this program in the second quarter. In addition, drilling activities continued in the second quarter on close-spaced definition of areas slated for mining this year and 2011.

#### Cerro Bayo Mine (Chile)

No exploration was conducted at Cerro Bayo during the second quarter of 2010.

#### Martha Mine (Argentina)

Exploration work at the Martha mine in the second quarter of 2010 consisted of target generation and drill site selection for future testing.

However, the Company conducts exploration in other parts of the Santa Cruz Province in Argentina. In the second quarter of 2010, the Company focused this effort on the Joaquin property, on which the Company has an option to acquire up to a 71% managing interest in a joint venture with Mirasol Resources Ltd. At Joaquin a fourth phase of drilling and further reconnaissance to identify new targets commenced in the second quarter of 2010. A total of 4,426 meters (14,521 feet) of core drilling were completed at the La Negra and La Morocha targets. The Company spent a total of $1.1 million in Argentina in the second quarter of 2010 on this and other work in the province. The Company holds a large area of surface and mineral concessions in Santa Cruz and is actively exploring several parcels.

#### Rochester (USA)

Exploration work consisted of mapping, sampling and detailed modeling of ore zones slated for future mining at Rochester. Late in the second quarter, drilling commenced on new targets between the Rochester and Packard mines. A total of 15,000 feet (4,472 meters) is planned in a first phase drilling program expected to be completed in the third quarter.

Development Projects:

#### Kensington (Alaska)

The Company invested $33.2 million at Kensington during the second quarter of 2010 and expects to invest an additional $41.0 million for the remainder of the year. Production during the mine’s initial, partial year is expected to be approximately 50,000 ounces of gold. Based on an initial 12.5 year mine life from current proven and probable mineral reserves, the Company expects gold production to average approximately 125,000 ounces annually and total operating costs to average $490 per ounce.

### Critical Accounting Policies and Estimates

Management considers the following policies to be most critical in understanding the judgments that are involved in preparing the Company’s consolidated financial statements and the uncertainties that could impact its results of operations, financial condition and cash flows. Our consolidated financial statements are affected by the accounting policies used and the estimates and assumptions made by management during their preparation. We have identified the policies below as critical to our business operations and the understanding of our results of operations. The information provided herein is based on our consolidated financial statements, which have been prepared in accordance with U.S. GAAP. The preparation of these statements requires that we make estimates and assumptions that affect the reported amounts of assets and liabilities, disclosure of contingent assets and liabilities at the date of the financial statements, and the reported amounts of revenue and expenses during the reporting period. We base these estimates on historical experience and on assumptions that we consider reasonable under the circumstances; however, reported results could differ from those based on the current estimates under different assumptions or conditions. The effects and associated risks of these policies on our business operations are discussed throughout this discussion and analysis. The areas requiring the use of management’s estimates and assumptions relate to ounces recoverable from proven and probable reserves that are the basis of future cash flow estimates and units-of-production depreciation and amortization calculations; useful lives utilized for depreciation, depletion, and long lived assets; estimates of gold and silver ounces recoverable from ore on leach pad; reclamation and remediation costs; valuation allowance for deferred tax assets; and post-employment and other employee benefit liabilities. For a detailed discussion on the application of these and other accounting policies, see Note 2 to the Notes to the Company’s consolidated financial statements.

**Revenue Recognition**. Revenue includes sales value received for our principal product, silver, and associated by-product revenues from the sale of by-product metals consisting primarily of gold. Revenue is recognized when title to metal passes to the buyer and when collectability is reasonably assured. Title passes to the customer based on terms of the sales contract. Product pricing is determined at the point revenue is recognized by reference to prices for the product in active and freely traded commodity markets, such as the London Bullion Market for both gold and silver, in an identical form to the product sold.

Under our concentrate sales contracts with third-party smelters, final gold and silver prices are set on a specified future quotational period, typically one to three months, after the shipment date based on market metal prices. Revenues are recorded under these contracts at the time title passes to the buyer based on the forward price for the expected settlement period. The contracts, in general, provide for provisional payment based upon provisional assays and quoted metal prices. Final settlement is based on the average applicable price for a specified future period and generally occurs from three to six months after shipment. Final sales are settled using smelter weights, settlement assays (average of assays exchanged or umpire assay results) and are priced as specified in the smelter contract. The Company’s provisionally priced sales contain an embedded derivative that is required to be separated from the host contract for accounting purposes. The host contract is the receivable from the sale of concentrates at the forward price at the time of sale. The embedded derivative does not qualify for hedge accounting. The embedded derivative is recorded on the balance sheet as a derivative asset in “Prepaid expenses and other assets” or as a derivative liability in “Accrued liabilities and other” and is adjusted to fair value through revenue each period until the date of final gold and silver settlement. The product sold, after smelting and refining, is in an identical form to that sold on the London Bullion Market. The form of the ultimate product is metal in flotation concentrate. Revenue includes sales of by-product gold from the Company’s mining operations.

The effects of forward sales contracts are reflected in revenue at the date the related precious metals are delivered. Third-party smelting and refining costs are recorded as a reduction of revenue.

At June 30, 2010, the Company had outstanding provisionally priced sales of $14.4 million, consisting of 0.7 million ounces of silver and 693 ounces of gold, which had a fair value of $14.4 million including the embedded derivative. For each one cent per ounce change in realized silver price, revenue would vary (plus or minus) approximately $7,000; and for each one dollar per ounce change in realized gold price, revenue would vary (plus or minus) approximately $700. At December 31, 2009, the Company had outstanding provisionally priced sales of $19.1 million consisting of 1.0 million ounces of silver and 1,227 ounces of gold, which had a fair value of approximately $19.1 million including the embedded derivative. For each one cent per ounce change in realized silver price, revenue would vary (plus or minus) approximately $10,000 and for each one dollar per ounce change in realized gold price, revenue would vary (plus or minus) approximately $1,200.

**Estimates.** Preparing the Company’s consolidated financial statements in conformity with U.S. GAAP requires management to make estimates and assumptions that affect the reported amount of assets and liabilities, disclosure of contingent assets and liabilities at the date of our financial statements, and the reported amounts of revenue and expenses during the reporting period. There can be no assurance that actual results will not differ from those estimates. The most critical accounting principles upon which the Company’s financial status depends are those requiring estimates of ounces recoverable from proven and probable reserves or assumptions of future commodity prices. There are a number of uncertainties inherent in estimating quantities of reserves, including many factors beyond our control. Ore reserves estimates are based upon engineering evaluations of samplings from drill holes and other openings. These estimates involve assumptions regarding future silver and gold prices, the geology of our mines, the mining methods we use and the related costs we incur to develop and mine our reserves. Changes in these assumptions could result in material adjustments to our reserve estimates. We use ore reserves estimates in determining the units-of-production depreciation and amortization expense, as well as in evaluating mine asset impairments.

We review and evaluate our long-lived assets for impairment when events or changes in circumstances indicate that the related carrying amounts may not be recoverable. An impairment is considered to exist if total estimated future cash flows or probability-weighted cash flows on an undiscounted basis are less than the carrying amount of the assets, including property, plant and equipment, mineral property, development property, and any deferred costs. The accounting estimates related to impairment are critical accounting estimates because the future cash flows used to determine whether an impairment exists are dependent on reserve estimates and other assumptions, including silver and gold prices, production levels, and capital and reclamation costs, all of which are based on detailed engineering life-of-mine plans.

We depreciate our property, plant and equipment, mining properties and mine development using the units-of-production method over the estimated life of the ore body based on our proven and probable recoverable reserves or on a straight-line basis over the useful life, whichever is shorter. The accounting estimates related to depreciation and amortization are critical accounting estimates because 1) the determination of reserves involves uncertainties with respect to the ultimate geology of our reserves and the assumptions used in assessing the economic feasibility of mining those reserves and 2) changes in estimated proven and probable reserves and useful asset lives can have a material impact on net income.

**Ore on Leach Pad.** The heap leach process is a process of extracting silver and gold by placing ore on an impermeable pad and applying a diluted cyanide solution that dissolves a portion of the contained silver and gold, which are then recovered in metallurgical processes. In August 2007, the Company terminated mining and crushing operations at the Rochester mine as ore reserves were fully mined. Residual heap leach activities are expected to continue through 2014.

The Company used several integrated steps to scientifically measure the metal content of ore placed on the leach pads. As the ore body was drilled in preparation for the blasting process, samples were taken of the drill residue which was assayed to determine estimated quantities of contained metal. The Company estimated the quantity of ore by utilizing global positioning satellite survey techniques. The Company then processed the ore through crushing facilities where the output was again weighed and sampled for assaying. A metallurgical reconciliation with the data collected from the mining operation was completed with appropriate adjustments made to previous estimates. The crushed ore was then transported to the leach pad for application of the leaching solution. As the leach solution is collected from the leach pads, it is continuously sampled for assaying. The quantity of leach solution is measured by flow meters throughout the leaching and precipitation process. After precipitation, the product is converted to doré, which is the final product produced by the mine. The inventory is stated at the lower of cost or market, with cost determined using a weighted average cost method.

The Company reported a value of ore on leach pad of $21.1 million as of June 30, 2010. Of this amount, $7.5 million is reported as a current asset and $13.6 million is reported as a non-current asset. The distinction between current and non-current is based upon the expected length of time necessary for the leaching process to remove the metals from the broken ore. The historical cost of metals contained within the broken ore that are expected to be extracted within twelve months is classified as current and the historical cost of metals contained within the broken ore that are expected to be extracted beyond twelve months is classified as non-current. Inventories of ore on leach pad are valued based on actual production costs incurred to produce and place ore on the leach pad, adjusted for effects on monthly production of costs of abnormal production levels, less costs allocated to minerals recovered through the leach process.

Estimates of both the ultimate recovery expected over time and the quantity of metal that may be extracted relative to the time the leach process occurs are inherently inaccurate since they rely upon laboratory testwork. Testwork evaluates 60 day leach columns from which the Company projects metal recoveries up to five years in the future. The quantities of metal contained in the ore are estimated based upon actual weights and assay analysis. The rate at which the leach process extracts gold and silver from the crushed ore is estimated based upon laboratory column tests and experience occurring over more than twenty years of leach pad operations at the Rochester Mine. The assumptions used by the Company to measure metal content during each stage of the inventory conversion process includes estimated recovery rates based on laboratory testing and assaying. The Company periodically reviews its estimates compared to actual experience and revises its estimates when appropriate. During the first quarter of 2010, the Company increased its estimate of silver ounces contained in the heap inventory by 1.2 million ounces. The increase in estimated silver ounces contained in the heap inventory is due to changes in estimated recoveries anticipated for the remainder of the residual leach phase. There were no significant changes in estimates related to gold contained in the heap. Consequently, the Company expects to continue its residual heap leach activities through 2014. The ultimate recovery will not be known until leaching operations cease. If our estimate of the ultimate recovery requires adjustment, the impact upon our valuation and upon our income statement would be as follows:

|  | Positive/Negative Changes in Silver Recovery |  |  | Positive/Negative Change in Gold Recovery |  |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
|  | **1%** | **2%** | **3%** | **1%** | **2%** | **3%** |
| Quantity of recoverable ounces | 1.7 million | 3.5 million | 5.2 million | 13,240 | 26,480 | 39,720 |
| Positive impact on future of cost of production per silver equivalent ounce for increases in recovery rates | $3.16 | $2.51 | $2.08 | $3.63 | $3.15 | $2.79 |
| Negative impact on future of cost of production per silver equivalent ounce for decreases in recovery rates | $6.60 | $12.22 | $12.22 | $5.21 | $6.58 | $6.58 |

Inventories of ore on leach pads are valued based upon actual production costs incurred to produce and place ore on the leach pad during the current period, adjusted for the effects on monthly production of costs of abnormal production levels, less costs allocated to minerals recovered through the leach process. The costs consist of those production activities occurring at the mine site and include the costs, including depreciation, associated with mining, crushing and precipitation circuits. In addition, a third party refines the metal extracted from the leach pad to a saleable form. These additional costs are considered in the valuation of inventory.

**Reclamation and remediation costs.** The Company recognizes obligations associated with the retirement of tangible long-lived assets and the associated asset retirement costs. These legal obligations are associated with the retirement of long-lived assets that result from the acquisition, construction, development and normal use of the assets. The fair value of a liability for an asset retirement obligation will be recognized in the period in which it is incurred if a reasonable estimate of fair value can be made. The fair value of the liability is added to the carrying amount of the associated asset and this additional carrying amount is depreciated over the life of the asset. An accretion cost, representing the increase over time in the present value of the liability, is recorded each period in depreciation, depletion and amortization expense. As reclamation work is performed or liabilities are otherwise settled, the recorded amount of the liability is reduced.

Future remediation costs for inactive mines are accrued based on management’s best estimate at the end of each period of the undiscounted costs expected to be incurred at the site. Such cost estimates include, where applicable, ongoing care and maintenance and monitoring costs. A change in an estimate is reflected in earnings in the period the estimate is revised.

**Income taxes.** The Company computes income taxes using an asset and liability approach which results in the recognition of deferred tax liabilities and assets for the expected future tax consequences or benefits of temporary differences between the financial reporting bases and the tax bases of assets and liabilities, as well as operating loss and tax credit carryforwards, using enacted tax rates in effect in the years in which the differences are expected to reverse.

In assessing the realizability of deferred tax assets, management considers whether it is more likely than not that some portion or all of its deferred tax assets will not be realized. Management considers the scheduled reversal of deferred tax liabilities, projected future taxable income and tax planning strategies in making this assessment. A valuation allowance has been provided for the portion of the Company’s net deferred tax assets which, it is more likely than not, will not be realized.

The Company and its subsidiaries are subject to U.S. federal income tax as well as income tax of multiple state and foreign jurisdictions. The Company has substantially concluded all U.S. federal income tax matters for years through 1999. Federal income tax returns for 2000 through 2008 are subject to examination. The Company’s practice is to recognize interest or penalties related to income tax matters in income tax expense. There were no significant accrued interest or penalties at June 30, 2010.

### RESULTS OF OPERATIONS

### Three Months Ended June 30, 2010 Compared to Three Months Ended June 30, 2009

Sales of metal from continuing operations in the second quarter of 2010 increased by 48.9% or $33.2 million to $101.0 million. The increase in sales of metal was primarily due to an increase in the quantity of gold ounces sold due to contributions from the Company’s Palmarejo silver and gold mine, which began commercial production on April 20, 2009. In the second quarter of 2010, the Company sold 4.1 million ounces of silver and 23,645 ounces of gold compared to 4.3 million ounces of silver and 11,816 ounces of gold for the same period in 2009. Realized silver and gold prices were $18.56 and $1,176.09 per ounce, respectively, in the second quarter of 2010, compared to $13.71 and $936.53 per ounce, respectively, in the comparable quarter of 2009.

Included in sales of metal are the by-product sales derived from the sale of gold. During the second quarter of 2010, by-product revenues totaled $27.7 million compared to $11.0 million in the second quarter of 2009. The increase is due to additional ounces of gold sold in the second quarter of 2010 primarily as a result of contribution from the Company’s Palmarejo mine which operated for the entire second quarter of 2010. The Company believes that presentation of these metal sales as by-products from its current operations will continue to be appropriate in the future.

In the second quarter of 2010, the Company produced a total of 4.2 million ounces of silver and 23,124 ounces of gold, compared to 3.9 million ounces of silver and 13,795 ounces of gold in the second quarter of 2009. The increase in silver production is primarily due to the increase of 482,922 ounces at the Palmarejo mine which operated at full capacity during the quarter, offset by decreased silver production of 53,218 ounces at the San Bartolomé mine primarily due to mining restrictions above the 4,400 meter level and 158,013 ounces of silver at the Martha Mine, which is expected to cease operating activities later this year. The increase in gold production in the second quarter of 2010 compared to the second quarter of 2009 is primarily due to the increase of 10,220 ounces of gold from the Palmarejo mine.

While quarterly sales of metal rose 48.9%, production costs applicable to sales of metal in the second quarter of 2010 increased only 19.9% to $58.6 million from $48.9 million in the second quarter of 2009.

Depreciation and depletion increased by $10.8 million, from $19.2 million to $30.0 million, compared to the second quarter of 2009. The increase is due to depreciation and depletion expense from the Palmarejo mine, which was not in full production during the second quarter of 2009.

#### Costs and Expenses

Administrative and general expenses increased by $1.5 million, from $5.4 million to $6.9 million, as compared to the second quarter of 2009. The increase is due to corporate administrative, legal and other costs.

Exploration expenses were $3.2 million in the second quarter of 2010 compared to $3.2 million in the same period of 2009.

Pre-development expenses were $0.6 million during the second quarter of 2010 due to permitting activities at the Rochester mine related to potential resumption of active mining in 2011. There were no pre-development costs in the second quarter of 2009.

#### Other Income and Expenses

The Company recognized $4.1 million of losses on debt extinguishments during the second quarter of 2010 from the exchange of a portion of the 3.25% Convertible Senior Notes and the 1.25% Convertible Senior Notes for shares of common stock, compared to a gain of $22.7 million during the second quarter of 2009.

Fair value adjustments, net in the three months ended June 30, 2010 were $42.5 million compared to $4.1 million in the second quarter of 2009. The increase was due to mark-to-market adjustments driven by higher gold prices related to the Franco-Nevada royalty obligation, the Mitsubishi gold lease facility, put and call options and forward foreign exchange contracts.

Interest and other income in the second quarter of 2010 decreased by $5.3 million to a loss of $3.8 million compared with the second quarter of 2009. The decrease was due to losses on foreign currency transactions.

Interest expense, net of capitalized interest, increased to $5.6 million in the second quarter of 2010 compared to $5.2 million in the second quarter of 2009 due to an increase in accretion expense related to the Franco-Nevada obligation, the gold lease facility, capital lease obligations and other short-term borrowings and lower capitalized interest at the Palmarejo mine which was placed into service in April 2009, thereby decreasing capitalized interest in the second quarter of 2010.

#### Income Taxes

For the three months ended June 30, 2010, the Company reported an income tax benefit of approximately $9.4 million compared to an income tax benefit of $3.9 million in the second quarter of 2009. The following table summarizes the components of the Company’s income tax benefits for the three months ended June 30, 2010 and 2009.

| Current: | Three Months Ended June 30, 2010 | 2009 |
| --- | ---: | ---: |
| United States — Alternative minimum tax | $— | $30 |
| United States — Foreign withholding | (624) | (578) |
| Argentina | (2,128) | (867) |
| Australia | (57) | 976 |
| Mexico | (33) | (7) |
| Canada | — | (53) |
| Bolivia | (3,721) | (3157) |
| Deferred: |  |  |
| United States | 20,422 | 817 |
| Australia | (292) | 230 |
| Mexico | (4,007) | 7,560 |
| Bolivia | (188) | (1,058) |
| Income tax benefit | $9,372 | $3,893 |

During the three months ended June 30, 2010, the Company recognized a current provision in Argentina and Bolivia primarily related to higher metal prices and inflation adjustments on non-monetary assets. Further, the Company accrued foreign withholding taxes of approximately $0.6 million on inter-company transactions between the U.S. parent and subsidiaries operating in Mexico, Argentina and Australia. Finally, the Company recognized a net $15.9 million deferred tax benefit for the recognition of deferred taxes on deductible temporary differences, foreign exchange rate adjustments and net operating loss carryforwards in various jurisdictions (principally in the U.S. and Mexico). In addition, the Company recorded a tax provision adjustment of $2.1 million related to prior periods.

During the three months ended June 30, 2009, the Company recognized a current provision in certain foreign jurisdictions primarily related to higher metal prices, inflationary adjustments on non-monetary assets and unrealized foreign exchange gains on U.S. dollar-denominated liabilities in Mexico and Bolivia. Further, the Company accrued foreign withholding taxes of approximately $0.6 million on inter-company transactions between the U.S. parent and subsidiaries operating in Argentina and Australia. Finally, the Company recognized a net $8.6 million deferred tax benefit for the recognition of deferred taxes on deductible temporary differences and net operating loss carryforwards in various jurisdictions (principally Mexico). The Company recognized a $1.1 million deferred tax provision in Bolivia for inflationary adjustments on non-monetary assets and unrealized foreign exchange gains on U.S. dollar-denominated liabilities.

#### Results of Discontinued Operations

On or about August 9, 2010, the Company expects to close the sale of its interest in the Cerro Bayo Mine. Pursuant to U.S. GAAP, Cerro Bayo has been reported in discontinued operations for the three month periods ended June 30, 2010 and 2009. Effective July 1, 2009, the Company completed the sale of its mineral interest in the Broken Hill mine to Perilya Broken Hill Ltd. for $55.0 million in cash. Pursuant to U.S. GAAP, Broken Hill has been reported in discontinued operations for the three month period ended June 30, 2009. There was no income (loss) from discontinued operations related to Broken Hill during the three months ended 2010. Loss from discontinued operations (net of taxes) for the three month period ended June 30, 2010 was $5.9 million, as compared to a gain from discontinued operation (net of taxes) for the three month period ended June 30, 2009 of $1.7 million.

The following is a summary of the Company’s discontinued operations included in the consolidated statements of operations for the three months ended June 30, 2010 and June 30, 2009 (in thousands):

|  | Three months ended June 30, 2010 Broken Hill | Cerro Bayo Mine | Total | Three months ended June 30, 2009 Broken Hill | Cerro Bayo Mine | Total |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Sales of metals | $— | $— | $— | $5,647 | $(84) | $5,563 |
| Productions costs applicable to sales | — | — | — | 913 | — | 913 |
| Depreciation and depletion | — | 1,028 | 1,028 | 872 | 1,061 | 1,933 |
| Care and maintenance expense | — | 809 | 809 | — | 609 | 609 |
| Other operating expenses | — | 8 | 8 | — | 1,216 | 1,216 |
| Interest and other income | — | (143) | (143) | — | 1,010 | 1,010 |
| Income tax benefit (expense) | — | (978) | (978) | (487) | 297 | (190) |
| Loss on sale of discontinued assets | — | (2,977) | (2,977) |  | — | — |
| Net income (loss) | $— | $(5,943) | $(5,943) | $3,375 | $(1,663) | $1,712 |

### Six Months Ended June 30, 2010 Compared to Six Months Ended June 30, 2009

Sales of metal from continuing operations in the six months ended June 30, 2010 increased by 70.2% or $78.1 million to $189.3 million. The increase in sales of metal was primarily due to an increase in the quantity of gold ounces sold due to contributions from the Company’s Palmarejo silver and gold mine, which began commercial production on April 20, 2009. During the six months ended June 30, 2010, the Company sold 7.7 million ounces of silver and 49,379 ounces of gold compared to 7.5 million ounces of silver and 15,941 ounces of gold during the same period in 2009. Realized silver and gold prices were $17.74 and $1,138.51 per ounce, respectively, in the six months ended June 30, 2010, compared to $13.22 and $933.72 per ounce, respectively, in the comparable quarter of 2009.

Included in sales of metal is the by-product sales derived from the sale of gold. During the six months ended June 30, 2010, by-product metal sales totaled $56.0 million compared to $14.6 million in the six months ended June 30, 2009. The increase is due to additional ounces of gold sold in the first half of 2010 primarily as a result of production at the Company’s Palmarejo mine which operated for the entire first half of 2010. The Company believes that presentation of these metal sales as by-products from its current operations will continue to be appropriate in the future.

In the six months ended June 30, 2010, the Company produced a total of 7.6 million ounces of silver and 48,907 ounces of gold, compared to 7.4 million ounces of silver and 17,586 ounces of gold in the six months ended June 30, 2009. The increase in silver production is primarily due to the increase of 1.8 million ounces at the Company’s Palmarejo mine, which operated at full capacity during the quarter offset by a decrease of 1.1 million at the San Bartolomé mine, due to mining restrictions above the 4,400 meter level and a decrease of 600,794 ounces at the Martha mine. The increase in gold production in the six months ended June 30, 2010 compared to the same period of 2009 is primarily due to the increase of 32,797 ounces of gold from the Palmarejo mine, which commenced commercial production in April of 2009.

While sales of metal increased 70.2% during the first six months of 2010, production costs applicable to sales of metal in the six months ended June 30, 2010 increased 50.1% to $110.4 million from $73.6 million in the six months ended June 30, 2009. The increase in production costs is primarily due to costs related to the commencement of operating activities at the Palmarejo mine, which was not in production until April of 2009.

Depreciation and depletion increased by $31.0 million, from $26.7 million to $57.7 million, as compared to the six months ended June 30, 2009. The increase is due to depreciation and depletion expense from the Palmarejo mine, which was not in production until April of 2009.

#### Costs and Expenses

Administrative and general expenses increased by $0.6 million, from $13.2 million to $13.8 million, as compared to the six months ended June 30, 2009. The increase of $0.6 million is primarily due to corporate administrative costs, legal and other expenses.

Exploration expenses decreased by $0.6 million to $5.7 million in the six months ended June 30, 2010 compared to $6.3 million in the same period of 2009 as a result of decreased exploration activities.

Pre-development expenses were $0.7 million during the first half of 2010, due to permitting activities, at the Rochester mine related to potential expansion of mining activities in early 2011. There were no pre-development costs in the first half of 2009.

#### Other Income and Expenses

The Company recognized $11.9 million of losses on debt extinguishments during the six months ended June 30, 2010 from the exchange of a portion of the 3.25% Convertible Senior Notes due 2028 and the 1.25% Convertible Senior Notes due 2024 for shares of common stock compared to a gain of $38.4 million during the six months ended June 30, 2009.

Fair value adjustments, net in the six months ended June 30, 2010 were $46.8 million compared to $13.6 million recorded in the six months ended June 30, 2009. The increase was due to mark-to-market adjustments driven by variations in gold prices related to the Franco-Nevada royalty obligation, the gold lease facility, put and call options and forward foreign exchange contracts.

Interest and other income in the six months ended June 30, 2010 decreased by $3.9 million to a loss of $2.1 million compared with the six months ended June 30, 2009. The decrease was due to losses on foreign currency transactions.

Interest expense, net of capitalized interest, increased to $11.5 million in the six months ended June 30, 2010 compared to $6.0 million in the six months ended June 30, 2009 due to an increase in interest expense related to senior secured notes, the Kensington credit facility, accretion expense for the Franco-Nevada obligation, the Mitsubishi gold lease facility, capital lease obligations and other short-term borrowings and lower capitalized interest at the Palmarejo mine which was placed into service in April 2009.

#### Income Taxes

For the six months ended June 30, 2010, the Company reported an income tax benefit of approximately $21.2 million compared to an income tax benefit of $3.6 million in the same period of 2009. The following table summarizes the components of the Company’s income tax benefit for the six months ended June 30, 2010 and 2009 (in thousands):

| Current: | Six Months Ended June 30, 2010 | 2009 |
| --- | ---: | ---: |
| United States — Alternative minimum tax | $— | $(239) |
| United States — Foreign withholding | (1,115) | (838) |
| Argentina | (2,141) | (1,332) |
| Australia | (57) | 818 |
| Mexico | (83) | (49) |
| Canada | — | (53) |
| Bolivia | (2,890) | (3,157) |
| Deferred: |  |  |
| United States | 21,993 | 2,366 |
| Australia | (582) | (97) |
| Mexico | 7,696 | 11,696 |
| Bolivia | (1,611) | (5,476) |
| Income tax benefit | $21,210 | $3,639 |

During the six months ended June 30, 2010, the Company recognized a current provision in Argentina and Bolivia primarily related to higher metals prices and inflationary adjustments on non-monetary assets. Further, the Company accrued foreign withholding taxes of approximately $1.1 million on inter-company transactions between the U.S. parent and subsidiaries operating in Mexico, Argentina and Australia. Finally, the Company recognized a net $27.5 million deferred tax benefit for the recognition of deferred taxes on deductible temporary differences, foreign exchange rate adjustments and net operating loss carryforwards in various jurisdictions (principally in the U.S. and Mexico).

During the six months ended June 30, 2009, the Company recognized a current provision in certain foreign jurisdictions primarily related to higher metals prices, inflationary adjustments on non-monetary assets and unrealized foreign exchange gains on U.S. dollar-denominated liabilities in Mexico and Bolivia. Further, the Company accrued foreign withholding taxes of approximately $0.8 million on inter-company transactions from the U.S. parent to the Argentina, Mexico, Chile and Australia subsidiaries. Finally, the Company recognized a $14.1 million deferred tax benefit for the recognition of deferred taxes on deductible temporary differences and net operating loss carryforwards in various jurisdictions (principally Mexico). The Company recognized a deferred tax provision of $5.6 million (principally in Bolivia) for inflation adjustments on non-monetary assets and unrealized foreign exchange gains on U.S. dollar denominated liabilities.

#### Results of Discontinued Operations

On or about August 9, 2010, the Company expects to close the sale of its interest in the Cerro Bayo Mine. Pursuant to U.S. GAAP, Cerro Bayo has been reported in discontinued operations for the six month periods ended June 30, 2010 and 2009. Effective July 1, 2009, the Company completed the sale of its mineral interest in the Broken Hill mine to Perilya Broken Hill Ltd. for $55.0 million in cash. Pursuant to U.S. GAAP, Broken Hill has been reported in discontinued operations for the six month period ended June 30, 2009. There was no income (loss) from discontinued operations related to Broken Hill during the six months ended June 30, 2010. Income (loss) from discontinued operations (net of taxes) for the six month periods ended June 30, 2010 and 2009 was ($8.8) million and $1.8 million respectively.

The following is a summary of the Company’s discontinued operations included in the consolidated statements of operations for the six months ended and June 30, 2010 June 30, 2009 (in thousands):

|  | Six months ended June 30, 2010 Broken Hill | Cerro Bayo Mine | Total | Six months ended June 30, 2009 Broken Hill | Cerro Bayo Mine | Total |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Sales of metals | $— | $— | $— | $10,356 | $1,631 | $11,987 |
| Productions costs applicable to sales | — | — | — | 1,699 | 1,211 | 2,910 |
| Depreciation and depletion | — | 2,082 | 2,082 | 1,619 | 2,129 | 3,748 |
| Care and maintenance expense | — | 1,878 | 1,878 | — | 1,347 | 1,347 |
| Other operating expenses | — | 16 | 16 | — | 2,547 | 2,547 |
| Interest and other income | — | (481) | (481) | — | 1,753 | 1,753 |
| Income tax benefit (expense) | — | (1,321) | (1,321) | (1,990) | 636 | (1,354) |
| Loss on sale of discontinued assets | — | (2,977) | (2,977) | — | — | — |
| Net income (loss) | $— | $(8,755) | $(8,755) | $5,048 | $(3,214) | $1,834 |

#### LIQUIDITY AND CAPITAL RESOURCES

#### Working Capital; Cash and Cash Equivalents

The Company’s working capital at June 30, 2010, decreased by $7.7 million to approximately $3.0 million compared to working capital of $10.7 million at December 31, 2009. The ratio of current assets to current liabilities was 1.0 to 1.0 at June 30, 2010 and was 1.1 to 1.0 at December 31, 2009. The decrease in working capital is primarily due to net assets held for sale relating to the Cerro Bayo sale partially offset by draw downs on the Kensington Credit Facility related to capital investment activity at the Kensington mine.

Net cash provided by operating activities in the three and six months ended June 30, 2010 was $32.5 million and $23.2 million respectively, compared with net cash provided by operating activities of $15.0 million and $18.1 million in the three and six month periods ended June 30, 2009. Excluding changes in operating assets and liabilities, the Company’s operating cash flow consisted of the following:

*(In thousands)*

*(In thousands)*

|  | Three Months Ended June 30, 2010 | 2009 | Six Months Ended June 30, 2010 | 2009 |
| --- | ---: | ---: | ---: | ---: |
| CASH PROVIDED BY OPERATING ACTIVITIES | $32,456 | $15,039 | $23,226 | $18,085 |
| Changes in operating assets and liabilities: |  |  |  |  |
| Receivables and other current assets | (3,662) | 11,653 | 7,625 | 9,000 |
| Inventories | 2,251 | 8,024 | 4,908 | 13,186 |
| Accounts payable and accrued liabilities | (8,998) | (18,175) | 14,003 | (16,936) |
| Operating cash flow | $22,047 | $16,541 | $49,762 | $23,335 |

Net cash used in investing activities in the second quarter of 2010 was $45.3 million compared to $36.8 million used in the second quarter of 2009. The increase is primarily due to higher capital investment activity at the Kensington mine and lower proceeds from the sale of investments. The Company’s financing activities used $1.9 million of cash during the three months ended June 30, 2010 compared to net cash provided by financing activities of $8.3 million during the three months ended June 30, 2009. The decrease in net cash provided by financing activities was primarily due to payments on the gold production royalty and payments for the credit facility, long-term debt, capital leases and bank borrowings, partially offset by the cash proceeds received in the second quarter of 2010 from bank borrowings.

Net cash used in investing activities in the six months ended June 30, 2010 was $92.6 million compared to $107.2 million used in the six months ended June 30, 2009. The decrease is primarily due to lower capital investment activity at the Palmarejo mine which commenced commercial production in April 2009. The Company’s financing activities provided $87.8 million of cash during the six months ended June 30, 2010 compared to $93.0 million during the six months ended June 30, 2009. The decrease in net cash provided by financing activities was primarily due to increased payments on the gold production royalty, credit facility, long-term debt and capital leases, partially offset by cash proceeds received from bank borrowings.

### Liquidity

As of June 30, 2010, the Company’s cash, equivalents and short-term investments totaled $41.2 million compared to $56.0 million in the first quarter of 2010. The decrease in cash and cash equivalants of 26.4% compared to the first quarter of 2010, was due to capital investment activity at Kensington and Palmarejo. The Company believes that its liquidity and projected operating cashflows will be adequate to meet its obligations for at least the next twelve months.

The Company may elect to defer some capital investment activities or to secure additional capital to provide additional liquidity. In addition, if the Company decides to pursue the acquisition of additional mineral interests, new capital projects, or acquisitions of new properties, mines or companies, additional financing activities may be necessary. There can be no assurances that such financing will be available when or if needed upon acceptable terms, or at all.

### Capitalized Expenditures

During the first half of 2010, capital expenditures totaled $92.7 million. The Company expended $27.3 million at the Palmarejo project, $63.1 million for construction and development activities at the Kensington project, $1.9 million for the development of the San Bartolomé mine and $0.4 million at the remaining sites.

### Gold Lease Facility

On December 12, 2008, the Company entered into a gold lease facility with Mitsubishi International Corporation (“MIC”). Under the facility, the Company received proceeds of $20 million for the sale of 23,529 ounces of gold leased from MIC to the Company. During 2009, the Company repaid 2,000 ounces of gold and leased an additional 5,000 ounces of gold. As of June 30, 2010, the Company had 15,029 ounces of gold leased from MIC. The Company has committed to deliver this number of ounces of gold to MIC over the next month on scheduled delivery dates. As of June 30, 2010 the Company is required to pledge certain collateral, including standby letters of credit of $2.25 million and $9.3 million of metal inventory held by a refiner. The Company accounts for the gold lease facility as a derivative instrument, which is recorded in accrued liabilities and other in the balance sheet.

#### Debt and Capital Resources

### 3.25% Convertible Senior Notes due 2028

As of June 30, 2010, the outstanding balance of the 3.25% convertible Senior Notes was $48.7 million, or $42.1 million net of debt discount. The notes are unsecured and bear interest at a rate of 3.25% per year, payable on March 15 and September 15 of each year. The notes mature on March 15, 2028, unless earlier converted, redeemed or repurchased by the Company.

Each holder of the notes may require that the Company repurchase some or all of such holder’s notes on March 15, 2013, March 15, 2015, March 15, 2018 and March 15, 2023 at a repurchase price equal to 100% of the principal amount of the notes to be repurchased, plus accrued and unpaid interest, in cash, shares of common stock or a combination of cash and shares of common stock, at the Company’s election. Holders will also have the right, following certain fundamental change transactions, to require the Company to repurchase all or any part of the notes for cash at a repurchase price equal to 100% of the principal amount of the notes to be repurchased plus accrued and unpaid interest. The Company may redeem the notes for cash in whole or in part at any time on or after March 22, 2015 at 100% of the principal amount of the notes to be redeemed plus accrued and unpaid interest.

The notes provide for “net share settlement” of any conversions. Pursuant to this feature, upon conversion of the notes, the Company (1) will pay the note holder an amount in cash equal to the lesser of the conversion obligation or the principal amount of the notes and (2) will settle any excess of the conversion obligation above the notes’ principal amount in the Company’s common stock, cash or a combination thereof, at the Company’s election.

The notes are convertible under certain circumstances, as described in the indenture agreement, at the holder’s option, at an initial conversion rate of 17.60254 shares of the Company’s common stock per $1,000 principal amount of notes, which is equivalent to an initial conversion price of approximately $56.81 per share, subject to adjustment in certain circumstances.

During the second quarter of 2010, $44.4 million of the 3.25% Convertible Senior Notes due 2028 were repurchased in exchange for 2.9 million shares of the Company’s common stock. The Company recognized a loss on the repurchase of $3.5 million in gain (loss) and debt extingushments.

During the six months ended June 30, 2010, $99.7 million of the 3.25% Convertible Senior Notes due 2025 were repurchased in exchange for 6.5 million shares of the Company’s Common Stock. The Company recognized a loss on the repurchase of $8.6 million in gain (loss) on debt extinguishments.

The fair value of the notes outstanding, as determined by market transactions at June 30, 2010 and December 31, 2009, was $44.5 million and $131.3 million, respectively. The carrying value of the equity component at June 30, 2010 and December 31, 2009 was $10.9 million and $33.4 million, respectively.

For the three and six month periods ended June 30, 2010, interest expense was $0.4 million and $1.6 million, respectively and accretion of the debt discount was $0.6 million and $1.9 million, respectively. The debt discount remaining was $6.5 million, which will be amortized through March 15, 2013. The effective interest rate on the notes was 8.9%, as a result of adopting the new accounting standard.

During the three and six months ended June 30, 2009, interest expense was $1.6 million and $3.4 million, respectively, and accretion of the debt discount was $1.9 million and $4.1 million, respectively.

### 1.25% Convertible Senior Notes due 2024

As of June 30, 2010, the Company had outstanding $1.9 million of its 1.25% Convertible Senior Notes due 2024. The remaining $1.9 million principal amount of the 1.25% Convertible Notes are convertible into shares of common stock at the option of the holder on each of January 15, 2011, January

14, 2014, and January 15, 2019, unless previously redeemed, at an initial conversion price of $76.00 per share, subject to adjustment in certain circumstances.

The Company is required to make semi-annual interest payments on January 15 and July 15 of each year. The notes are redeemable at the option of the Company before January 18, 2011, if the closing price of the Company’s common stock over a specified number of trading days exceeds 150% of the conversion price, and anytime after January 18, 2011. Before January 18, 2011, the redemption price is equal to 100% of the principal amount of the notes, plus an amount equal to 8.75% of the principal amount of the notes, less the amount of any interest actually paid on the notes on or prior to the redemption date. The notes are due on January 15, 2024.

Each holder of the notes may require that the Company repurchase some or all of the holder’s notes on January 15, 2011, January 15, 2014 and January 15, 2019 at a repurchase price equal to 100% of the principal amount of the notes to be repurchased, plus accrued and unpaid interest, in cash, shares of common stock or a combination of cash and shares of common stock, at the Company’s election. Holders will also have the right, following certain fundamental change transactions, to require the Company to repurchase all or any part of their notes for cash at a repurchase price equal to 100% of the principal amount of the notes to be repurchased plus accrued and unpaid interest.

During the six months ended June 30, 2010, $20.4 million of the 1.25% convertible senior notes due 2024 were repurchased in exchange for 1.2 million shares of the Company’s common stock which reduced the principal amount of the notes to $1.9 million as of June 30, 2010. The company recognized a loss on the repurchase of $1.7 million in gain (loss) on debt extinguishments. There were no repurchases in the second quarter of 2010.

The fair value of the notes outstanding, as determined by market transactions on June 30, 2010 and December 31, 2009, was $1.9 million and $22.8 million, respectively.

Interest on the notes for the three and six month periods ended June 30, 2010 was $5,809 and $16,508, respectively. Interest on the notes for the three and six month periods ended June 30, 2009 was $0.4 million and $1.0 million, respectively.

### Senior Term Notes due December 31, 2012

On February 5, 2010 the Company completed the sale of $100 million of Senior Term Notes due in quarterly payments through December 31, 2012. In conjunction with the sale of these notes, the Company also issued shares of its common stock valued at $4.2 million as financing costs. The principal of the notes is payable in twelve equal quarterly installments, with the first such installment paid on March 31, 2010. The Company has the option of paying amounts due on the notes in cash, shares of common stock or a combination of cash and shares of common stock. The stated interest rate on the notes is 6.5%, but the payments for principal and interest due on any payment date will be computed to give effect to recent share prices, valuing the shares of common stock at 90% of a weighted average share price over a pricing period ending shortly before the payment date. The company elected to pay the June 30, 2010 payment with a combination of 50% cash and 50% common stock. The March 31, 2010 payment was paid entirely with common stock. For the three and six months ended June 30, 2010, the Company paid $8.3 million and $16.6 million, respectively, in principal and $1.5 million and $2.5 million, respectively, in interest. For the three and six months ended June 30, 2010 the Company issued 348,410 shares and 1,060,413 shares, respectively, of the Company’s stock. The effective interest rate was approximately 10.6%, which includes a loss of $0.5 million and $1.6 million, for the three and six months ended June 30, 2010 respectively, in connection with this quarterly debt payment. The loss is recorded in gain (loss) on debt extinguishments.

### Kensington Term Facility

On October 27, 2009 the Company entered into a term facility with Credit Suisse whereby Credit Suisse agreed to provide Coeur Alaska, a wholly-owned subsidiary of the Company, a $45 million, five-year term facility to fund the remaining construction at the Company’s Kensington Gold Mine in Alaska. The Company began drawing down the facility during the fourth quarter of 2009. Beginning three months after an approximate twelve-month grace period commencing in November 2009, Coeur Alaska will repay the loan in equal quarterly payments with interest based on a margin over the three-month LIBOR rate. The facility is secured by the mineral rights and infrastructure at Kensington as well as a pledge of the shares of Coeur Alaska owned by Coeur.

As of June 30, 2010, the Company has $40.8 million outstanding, bearing interest at 5.5% (three month Libor rate plus 5% margin). The Company is also subject to financial covenants including (i) guarantor tangible net worth; (ii) borrower tangible net worth; (iii) debt to equity ratio; (iv) debt service coverage ratio; and (v) maximum production cost. Events of default under the Kensington term facility include (i) a cross-default of other indebtedness; (ii) a material adverse effect; (iii) loss of or failure to obtain applicable permits; and (iv) failure to achieve final completion date.

As a condition to the Kensington term facility, with Credit Suisse noted above, the Company agreed to enter into a gold hedging program which protects a minimum of 125,000 ounces of gold production over the life of the facility against the risk associated with fluctuations in the market price of gold. This program took the form of a series of zero cost collars which consist of a floor price and a ceiling price of gold. The required collars of 125,000 ounces of gold were entered into in November and December 2009. The collars mature quarterly beginning September 2010 and conclude in December 2014. The weighted average put feature of each collar is $862.50 per ounce and the weighted average call feature of each collar is $1,688.50 per ounce.

### Bank Loans

On March 3, 2010, Coeur Mexicana, entered into three short term bank loans in the amount of $5.0 million with FIFOMI secured by Coeur d’ Alene Mines and certain machinery and equipment to fund working capital requirements. The bank loans bear interest at 13.45% and mature between 36 and 60 months. As of June 30, 2010 the company has drawn $4.6 million on two of the loans.

On April 14, 2010, the Company’s wholly owned Bolivian subsidiary, Empresa Minera Manquiri, received proceeds from short-term borrowings from Banco de Credito de Bolivia in the amount of $2.5 million bearing interest at approximately 5.0% to fund working capital requirements. The short-term borrowings were repaid on June 14, 2010.

On June 22, 2010, Empresa Minera Manquiri received proceeds from short-term borrowings from Banco de Credito de Bolivia in the amount of $2.5 million bearing interest at approximately 4.8% to fund working capital requirements. The short-term borrowings mature on August 22, 2010.

On November 27, 2009, Empressa Minera Manquiri, received proceeds from short-term borrowings from Banco Bisa in the amount of $5.0 million bearing an interest rate of 6.5% to fund working capital requirements. The short-term bank loan matures on November 17, 2011.

During 2008, Empressa Minera Manquiri received proceeds from short-term borrowings from Banco Bisa and Banco de Credito de Bolivia in the amount of $3.0 million to fund working capital requirements. The short-term bank loans matured and were repaid in April 2009.

During the fourth quarter of 2008, the Company’s wholly-owned Argentine subsidiary, (Coeur Argentina S.R.L.), entered into several temporary credit lines in the amount of $3.5 million with the Standard Bank of Argentina secured by a standby letter of credit by Cerro Bayo, (a wholly owned subsidiary of the Company), to fund working capital requirements. The credit lines matured and were repaid on April 13, 2009, June 30, 2009 and July 24, 2009.

### Palmarejo Gold Production Royalty Obligation

On January 21, 2009, the Company entered into a gold production royalty transaction with Franco-Nevada Corporation under which Franco-Nevada purchased a royalty covering 50% of the life of mine gold to be produced by Coeur from its Palmarejo silver and gold mine in Mexico. Coeur received total consideration of $78.0 million consisting of $75.0 million in cash, plus a warrant to acquire Franco-Nevada Common Shares (the “Franco-Nevada warrant”), which was valued at $3.0 million at closing of the Franco-Nevada transaction and is yet to be exercised. From July 1, 2009 until payments have been made on a total of 400,000 ounces of gold, the royalty obligation is payable in an amount equal to the greater of the minimum of 4,167 ounces of gold or 50% of actual gold production per month multiplied by the market price of gold in excess of $400 (which $400 floor is subject to a 1% annual inflation compounding adjustment beginning on the fourth anniversary of the transaction). After payments have been made on a total of 400,000 ounces of gold, the royalty obligation is payable in an amount equal to 50% of actual gold production per month multiplied by the market price of gold in excess of $400, as adjusted as described above. The Company used an implicit interest rate of 27.4% to discount the original obligation. The royalty obligation is accreted to its expected value over the expected minimum payment period based on an implicit interest rate. The price volatility associated with this minimum Royalty Obligation is considered an embedded derivative under U.S. GAAP and is described in Note 13, Derivative Financial Instruments and Fair Value of Financial Instruments, Palmarejo Gold production royalty. During the three and six months ended June 30, 2010, the Company paid $9.6 million and $18.5 million, respectively, in royalty payments to Franco-Nevada Corporation. As of June 30, 2010 and December 31, 2009, the remaining obligation balance was $83.0 million and $84.8 million, respectively.

#### Capitalized Interest

The Company capitalizes interest incurred on its various debt instruments as a cost of properties under development. For the three and six months ended June 30, 2010 the Company capitalized interest of $4.2 million and $8.4 million, respectively. For the three and six months ended June 30, 2009, the Company capitalized interest of $4.9 million and $15.9 million, respectively.

#### Litigation and Other Events

For a discussion of litigation and other events, see Note 17 to the Company’s Consolidated Financial Statements, Litigation and Other Events.

## Market risk

As filed, 11,776 characters.

The Company is exposed to various market risks as a part of its operations. In an effort to mitigate losses associated with these risks, the Company may, at times, enter into derivative financial instruments. These may take the form of forward sales contracts, foreign currency exchange contracts and interest rate swaps. The Company does not actively engage in the practice of trading derivative instruments for profit. This discussion of the Company’s market risk assessments contains “forward looking statements” that are subject to risks and uncertainties. Actual results and actions could differ materially from those discussed below.

The Company’s operating results are substantially dependent upon the world market prices of silver and gold. The Company has no control over silver and gold prices, which can fluctuate widely and are affected by numerous factors, such as supply and demand and investor sentiment. From time to time, in order to mitigate some of the risk associated with these fluctuations, the Company may enter into forward sale contracts. The Company continually evaluates the potential benefits of engaging in these strategies based on current market conditions. The Company may be exposed to nonperformance risk by counterparties as a result of its hedging activities. This exposure would be limited to the amount that the spot price of the metal falls short of the contract price. The Company enters into contracts and other arrangements from time to time in an effort to reduce the negative effect of price changes on its cashflows. These arrangements typically consist of managing the Company’s exposure to foreign currency exchange rates and market prices associated with changes in gold and silver commodity prices. The Company may also manage price risk by purchasing put options.

The Company enters into concentrate sales contracts with third-party smelters. The contracts, generally, provide for a provisional payment based upon provisional assays and quoted metal prices. The provisionally priced sales contracts contain an embedded derivative that is required to be separated from the host contract for accounting purposes. The host contract is the receivable from the sale of concentrates at the forward price at the time of sale. The embedded derivative, which is the final settlement price based on a future price, does not qualify for hedge accounting. These embedded derivatives are recorded on our balance sheet as derivative assets in “Prepaid expenses and other” or as derivative liabilities in “Accrued liabilities and other” and are adjusted to fair value through earnings each period until the date of final settlement.

At June 30, 2010, the Company had outstanding provisionally priced sales of $14.4 million, consisting of 0.7 million ounces of silver and 693 ounces of gold, which had an aggregate fair value of $14.4 million including the embedded derivative. For each one cent per ounce change in realized silver price, revenue would vary (plus or minus) approximately $7,000; and for each one dollar per ounce change in realized gold price, revenue would vary (plus or minus) approximately $700. At December 31, 2009, the Company had outstanding provisionally priced sales of $19.1 million consisting of 1.0 million ounces of silver and 1,227 ounces of gold, which had an aggregate fair value of approximately $19.1 million including the embedded derivative. For each one cent per ounce change in realized silver price, revenue would vary (plus or minus) approximately $10,000 and for each one dollar per ounce change in realized gold price, revenue would vary (plus or minus) approximately $1,200.

The Company operates, or has mining interests, in several foreign countries, specifically Australia, Bolivia, Chile, Mexico and Argentina, which exposes the Company to risks associated with fluctuations in the exchange rates of the currencies involved. From time to time, as part of its program to manage foreign currency risk, the Company may enter into foreign currency forward exchange contracts. These contracts enable the Company to purchase a fixed amount of foreign currencies at pre-established exchange rates. Gains and losses on foreign exchange contracts that are related to firm commitments are designated and effective as hedges and are deferred and recognized in the same period as the related transaction. All other contracts that do not qualify as hedges are marked to market and the resulting gains or losses are recorded in income. The Company continually evaluates the potential benefits of entering into these contracts to mitigate foreign currency risk and proceeds when it believes that the exchange rates are most beneficial.

During 2009, the Company entered into forward foreign currency contracts to reduce the foreign exchange risk associated with forecasted Mexican peso (“MXP”) operating costs at its Palmarejo mine. At June 30, 2010, the Company had MXP foreign exchange contracts of $21.6 million in U.S. dollars. These contracts require the Company to exchange U.S. dollars for MXP at a weighted average exchange rate of 13.22 MXP to each U.S. dollar and had a fair value of $0.1 million at June 30, 2010. The Company recorded mark-to-market gains (losses) of $(1.6) million and $0.5 million for the three months ended June 30, 2010 and 2009, respectively, and $(1.2) million and $(3.3) million for the six months ended June 30, 2010 and 2009, respectively which is reflected in the consolidated statement of operations in “Fair value adjustments, net.” The Company recorded realized gains of $0.5 million and $0.2 million in production costs applicable to sales during the three months ended June 30, 2010 and 2009, respectively and $0.5 million and $0.5 million for the six months ended June 30, 2010 and 2009, respectively.

On December 12, 2008, the Company entered into a gold lease facility with Mitsubishi International Corporation (“MIC”). Under the facility, the Company received proceeds of $20 million for the sale of 23,529 ounces of gold leased from MIC to the Company. During 2009, the Company repaid 2,000 ounces of gold and leased an additional 5,000 ounces of gold. As of June 30, 2010, the Company had 15,029 ounces of gold leased from MIC. The Company has committed to deliver this number of ounces of gold to MIC on scheduled delivery dates. As of June 30, 2010 the Company is required to pledge certain collateral, including standby letters of credit of $2.25 million and $9.3 million of metal inventory held by a refiner. The Company accounts for the gold lease facility as a derivative instrument, which is recorded on the balance sheet in “Accrued liabilities and other”.

As of June 30, 2010 and December 31, 2009, based on the current futures metals prices for each of the delivery dates and using a 5.8% and 5.7% discount rate, respectively, the fair value of the Gold Lease facility was a liability of $18.6 million and $28.5 million, respectively. The pre-credit risk adjusted fair value of the net derivative liability as of June 30, 2010 was $18.7 million. A credit risk adjustment of $0.1 million to the fair value of the derivative reduced the reported amount of the net derivative liability on the Company’s consolidated balance sheet to $18.6 million. Mark-to market adjustments for the gold lease facility amounted to a loss of a $2.2 million and a loss of $1.5 million for the three months ended June 30, 2010 and 2009, respectively and $0.8 million and $1.6 million for the six months ended June 30, 2010 and 2009, respectively. The Company recorded realized losses of nil for the three months ended June 30, 2010 and 2009, respectively, and $1.9 million and $0.2 million for the six months ended June 30, 2010 and 2009, respectively. The mark-to-market adjustments and realized losses are included on the consolidated statement of operations in “Fair value adjustments, net.”

During 2009, the Company purchased silver put options to reduce the risk associated with potential decreases in the market price of silver. The cost of these put options was largely offset by proceeds received from the sale of gold call options. At June 30, 2010, the Company held put options allowing it to deliver 1.8 million ounces of silver at a weighted average strike price of $9.17 per ounce. The contracts will expire over the next three months.

In connection with the Credit Suisse credit facility described in Note 8, Kensington Term Facility, at June 30, 2010, the Company had written outstanding call options requiring it to deliver 125,000 ounces of gold at a weighted average strike price of $1,688.50 per ounce if the market price of gold exceeds the strike price. In addition, the Company had purchased outstanding put options allowing it to sell 125,000 ounces of gold at a weighted average strike price of $862.50 per ounce if the market price of gold were to fall below the strike price. The contracts will expire over the next five years. As of June 30, 2010 the fair market value of these contracts was a net liability of $7.5 million.

During the six months ended June 30, 2010, outstanding put options allowing the Company to deliver 3.6 million ounces of silver at an average strike price of $9.24 per ounce expired. The Company recorded realized losses of $0.8 million and $1.6 million for the three and six months ended June 30, 2010, respectively, included in fair value adjustments, net.

During the three and six months ended June 30, 2009, the Company recorded realized gains of $0.2 million and $0.2 million, respectively, included in fair value adjustments, net.

On January 21, 2009, the Company entered into the gold production royalty transaction with Franco-Nevada Corporation that is described in Note 8, Long Term Debt, Franco-Nevada Royalty Obligation. The minimum royalty obligation ends when payments have been made on a total of 400,000 ounces of gold. The price volatility associated with minimum royalty obligation is considered an embedded derivative financial instrument under U.S. GAAP. The fair value of the embedded derivative at June 30, 2010 and December 31, 2009 was a liability of $109.7 million and $78.0 million, respectively. The Franco-Nevada warrant is a contingent option to acquire 316,436 common shares of Franco-Nevada for no additional consideration, once the mine satisfies certain completion tests stipulated in the agreement. The Franco-Nevada warrant is considered a derivative instrument. The fair value of the warrant at June 30, 2010 and December 31, 2009 was $8.7 million and $6.3 million, respectively. These derivative instruments are recorded in prepaid expenses and other, current or non-current royalty obligation on the balance sheet and adjusted to fair value through current earnings. During the three months ended June 30, 2010, mark-to-market adjustments for the embedded derivative and warrant amounted to a loss of $30.0 million and a gain of $1.0 million, respectively, and for the same period in 2009, a loss of $5.5 million and a gain of $0.5 million, respectively. During the six months ended June 30, 2010, mark-to-market adjustments for the embedded derivative and warrant amounted to a loss of $31.7 million and a gain of $2.3 million, respectively, and for the same period in 2009 a loss of $18.2 million and a gain of $1.9 million, respectively. For the three and six months ended June 30, 2010, realized losses on settlement of the liabilities were $3.7 million and $6.8 million respectively. For the three and six months ended June 30, 2009, realized losses on settlement of liabilities were $0.1 million and $0.1 million, respectively. The mark-to-market adjustments and realized losses are included in fair value adjustments, net in the consolidated statement of operations.

## Controls and procedures

As filed, 1,975 characters.

### (a) Disclosure Controls and Procedures

As of the end of the period covered by this quarterly report, the Company carried out an evaluation, under the supervision and with the participation of the Company’s management, including its Chief Executive Officer and Chief Financial Officer, of the effectiveness of the design and operation of the Company’s disclosure controls and procedures (as such term is defined in Rules 13a-15(e) and 15d-15(e) of the Securities Exchange Act of 1934 (the “Exchange Act”), and management necessarily applied its judgment in assessing the costs and benefits of such controls and procedures, which by their nature, can provide only reasonable assurance regarding management’s control objectives. The design of any system of controls is based in part upon certain assumptions about the likelihood of future events. Based upon the foregoing, the Company’s Chief Executive Officer and Chief Financial Officer concluded that the Company’s disclosure controls and procedures were effective and operating to provide reasonable assurance that information required to be disclosed by it in the reports it files or submits under the Exchange Act is recorded, processed, summarized and reported, within the time periods specified in the SEC’s rules and forms, and to provide reasonable assurance that such information is accumulated and communicated to the Company’s management, including its Chief Executive Officer and Chief Financial Officer, as appropriate to allow timely decisions regarding required disclosure.

### (b) Changes in Internal Control over Financial Reporting

Based on an evaluation by the Company’s Chief Executive Officer and Chief Financial Officer, such officers concluded that there was no change in the Company’s internal control over financial reporting during the quarter ending June 30, 2010 that has materially affected, or is reasonably likely to materially affect, the Company’s internal control over financial reporting.

## Risk factors

As filed, 3,765 characters.

Item 1A (“Risk Factors”) of the Company’s Annual Report on Form 10-K for the year ended December 31, 2009 sets forth information relating to important risks and uncertainties that could materially adversely affect the Company’s business, financial condition or operating results. Those risk factors continue to be relevant to an understanding of the Company’s business, financial condition and operating results. Those risk factors have been supplemented and updated in this Form 10-Q as set forth below. References to “we,” “our” and “us” in these risk factors refer to the Company. Additional risks and uncertainties that we do not presently know or that we currently deem immaterial may also impair our business operations.

***The market prices of silver and gold are volatile. Low silver and gold prices could result in decreased revenues, decreased net income or increased losses and decreased cash flows, and may negatively affect our business.***

Silver and gold are commodities. Their prices fluctuate, and are affected by many factors beyond our control, including interest rates, expectations regarding inflation, speculation, currency values, governmental decisions regarding the disposal of precious metals stockpiles, global and regional demand and production, political and economic conditions and other factors. Because we currently derive approximately 70% of our revenues from continuing operations from sales of silver and 30% from gold, our earnings are primarily related to the price of these metals.

The market prices of silver (Handy & Harman) and gold (London Final) on August 6, 2010 were $18.51 per ounce and $1,207.75 per ounce, respectively. The prices of silver and gold may decline in the future. Factors that are generally understood to contribute to a decline in the price of silver include sales by private and government holders, and a general global economic slowdown.

If the prices of silver and gold are depressed for a sustained period and our net losses continue, we may be forced to suspend mining at one or more of our properties until the prices increase, and to record additional asset impairment write-downs. Any lost revenues, continued or increased net losses or additional asset impairment write-downs would adversely affect our financial condition and results of operations.

***High levels of violence in Mexico could affect our operations at our Palmarejo gold and silver mine.***

Our Palmarejo mine is located in Chihuahua, an area of Mexico that currently is experiencing high levels of violence. Security at our Palmarejo mine is an important consideration. High levels of violence in the area could adversely affect our ability to staff the operations at Palmarejo in an optimal fashion, to supply and operate the mine at design capacity and to deliver gold and silver to refiners.

### Our business depends on good relations with our employees.

The Company could experience labor disputes, work stoppages or other disruptions in production that could adversely affect us. As of June 30, 2010, unions represented approximately 19% of our worldwide workforce. On that date, the Company had 7 employees at its Cerro Bayo mine and 98 employees at its Martha mine who were working under collective bargaining agreement. The agreement covering the Cerro Bayo mine expires on December 21, 2010 and a collective bargaining agreement covering the Martha mine expires on October 31, 2010. In connection with the sale of Cerro Bayo which is expected to close on August 9, 2010, our obligations under the agreement at Cerro Bayo will terminate. Additionally, the Company had 175 employees at its San Bartolomé mine working under a labor agreement which became effective October 11, 2007, and does not have a fixed term.

Filed Aug 9, 2010.
Source: SEC EDGAR, the filing index for accession 0000950123-10-075098. Last ingested by Listed: Nov 14, 2026, 12:15 ET. No prices; not investment advice.