# Ormat Technologies, Inc.: Form 10-Q for the period ended Sep 30, 2010

- Company: [Ormat Technologies, Inc.](/companies/ora.md) (CIK 1296445)
- Form: 10-Q
- Filed: 2010-11-04
- Accepted by EDGAR: Nov 4, 2010, 16:53 ET
- Period: 2010-09-30
- Accession: 0000950123-10-100995
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/1296445/000095012310100995/y87403e10vq.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/1296445/000095012310100995/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2010-09-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2010-07-01 to 2010-09-30 | $101.5m | us-gaap:SalesRevenueNet |
| Revenue | 9 months, 2010-01-01 to 2010-09-30 | $280.4m | us-gaap:SalesRevenueNet |
| Cost of revenue | 3 months, 2010-07-01 to 2010-09-30 | $76.3m | us-gaap:CostOfGoodsAndServicesSold |
| Cost of revenue | 9 months, 2010-01-01 to 2010-09-30 | $220.9m | us-gaap:CostOfGoodsAndServicesSold |
| Gross profit | 3 months, 2010-07-01 to 2010-09-30 | $25.2m | us-gaap:GrossProfit |
| Gross profit | 9 months, 2010-01-01 to 2010-09-30 | $59.5m | us-gaap:GrossProfit |
| Research and development | 3 months, 2010-07-01 to 2010-09-30 | $1.3m | us-gaap:ResearchAndDevelopmentExpense |
| Research and development | 9 months, 2010-01-01 to 2010-09-30 | $8.1m | us-gaap:ResearchAndDevelopmentExpense |
| Operating income | 3 months, 2010-07-01 to 2010-09-30 | $14.8m | us-gaap:OperatingIncomeLoss |
| Operating income | 9 months, 2010-01-01 to 2010-09-30 | $19.3m | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2010-07-01 to 2010-09-30 | $11.0m | us-gaap:InterestExpense |
| Interest expense | 9 months, 2010-01-01 to 2010-09-30 | $30.1m | us-gaap:InterestExpense |
| Income tax | 3 months, 2010-07-01 to 2010-09-30 | $11.9m | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 9 months, 2010-01-01 to 2010-09-30 | $6.0m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2010-07-01 to 2010-09-30 | $32.5m | us-gaap:NetIncomeLoss |
| Net income | 9 months, 2010-01-01 to 2010-09-30 | $32.9m | us-gaap:NetIncomeLoss |
| Diluted shares (weighted) | 3 months, 2010-07-01 to 2010-09-30 | 45,450,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 9 months, 2010-01-01 to 2010-09-30 | 45,452,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Dividends paid | 9 months, 2010-01-01 to 2010-09-30 | $10.0m | us-gaap:PaymentsOfDividendsCommonStock |
| Cash and equivalents | at 2010-09-30 | $49.2m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2010-09-30 | $218.8m | us-gaap:AssetsCurrent |
| Total assets | at 2010-09-30 | $1.96bn | us-gaap:Assets |
| Current liabilities | at 2010-09-30 | $139.7m | us-gaap:LiabilitiesCurrent |
| Total liabilities | at 2010-09-30 | $1.03bn | us-gaap:Liabilities |
| Shareholders' equity | at 2010-09-30 | $934.3m | us-gaap:StockholdersEquity |
| Shares outstanding | at 2010-09-30 | 45,430,886 shares | dei:EntityCommonStockSharesOutstanding |

## Management's discussion and analysis

As filed, 133,616 characters.

This quarterly report on Form 10-Q includes “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995. All statements, other than statements of historical facts, included in this quarterly report that address activities, events or developments that we expect or anticipate will or may occur in the future, including such matters as our projections of annual revenues, expenses and debt service coverage with respect to our debt securities, future capital expenditures, business strategy, competitive strengths, goals, development or operation of generation assets, market and industry developments and the growth of our business and operations, are forward-looking statements. When used in this quarterly report on Form 10-Q, the words “may”, “will”, “could”, “should”, “expects”, “plans”, “anticipates”, “believes”, “estimates”, “predicts”, “projects”, “potential”, or “contemplate” or the negative of these terms or other comparable terminology are intended to identify forward-looking statements, although not all forward-looking statements contain such words or expressions. The forward-looking statements in this quarterly report are primarily located in the material set forth under the headings “Management’s Discussion and Analysis of Financial Condition and Results of Operations”, “Risk Factors”, and “Notes to Condensed Consolidated Financial Statements”, but are found in other locations as well. These forward-looking statements generally relate to our plans, objectives and expectations for future operations and are based upon management’s current estimates and projections of future results or trends. Although we believe that our plans and objectives reflected in or suggested by these forward-looking statements are reasonable, we may not achieve these plans or objectives. You should read this quarterly report on Form 10-Q completely and with the understanding that actual future results and developments may be materially different from what we expect due to a number of risks and uncertainties, many of which are beyond our control. We will not update forward-looking statements even though our situation may change in the future.

Specific factors that might cause actual results to differ from our expectations include, but are not limited to:

- significant considerations, risks and uncertainties discussed in this quarterly report;
- operating risks, including equipment failures and the amounts and timing of revenues and expenses;
- geothermal resource risk (such as the heat content, useful life and geological formation of the reservoir);
- financial market conditions and the results of financing efforts;
- environmental constraints on operations and environmental liabilities arising out of past or present operations, including the risk that we may not have, and in the future may be unable to procure, any necessary permits or other environmental authorization;
- construction or other project delays or cancellations;
- political, legal, regulatory, governmental, administrative and economic conditions and developments in the United States and other countries in which we operate;
- the enforceability of the long-term power purchase agreements (PPAs) for our power plants;
- contract counterparty risk;
- weather and other natural phenomena;
- the impact of recent and future federal and state regulatory proceedings and changes, including legislative and regulatory initiatives regarding deregulation and restructuring of the electric utility industry and incentives for the production of renewable energy at the federal and state level in the United States and elsewhere;
- changes in environmental and other laws and regulations to which our company is subject, as well as changes in the application of existing laws and regulations;

31

- current and future litigation;
- our ability to successfully identify, integrate and complete acquisitions;
- competition from other existing geothermal energy projects and new geothermal energy projects developed in the future, and from alternative electricity producing technologies;
- the effect of and changes in economic conditions in the areas in which we operate;
- market or business conditions and fluctuations in demand for energy or capacity in the markets in which we operate;
- the direct or indirect impact on our company’s business resulting from terrorist incidents or responses to such incidents, including the effect on the availability of and premiums on insurance;
- the effect of and changes in current and future land use and zoning regulations, residential, commercial and industrial development and urbanization in the areas in which we operate;
- the risk factors set forth in our Annual Report on Form 10-K for the year ended December 31, 2009;
- other uncertainties which are difficult to predict or beyond our control and the risk that we incorrectly analyze these risks and forces or that the strategies we develop to address them could be unsuccessful; and
- other risks and uncertainties detailed from time to time in our filings with the Securities and Exchange Commission (SEC).

Investors are cautioned that these forward-looking statements are inherently uncertain. Should one or more of these risks or uncertainties materialize, or should underlying assumptions prove incorrect, actual results or outcomes may vary materially from those described herein. We undertake no obligation to update forward-looking statements even though our situation may change in the future. Given these risks and uncertainties, readers are cautioned not to place undue reliance on such forward-looking statements.

The following discussion and analysis of our financial condition and results of operations should be read together with our condensed consolidated financial statements and related notes included elsewhere in this report and the “Risk Factors” section of our Annual Report on Form 10-K for the year ended December 31, 2009 and any updates contained herein as well as those set forth in our reports and other filings made with the SEC.

### General

### Overview

We are a leading vertically integrated company engaged in the geothermal and recovered energy power business. We design, develop, build, sell, own and operate clean, environmentally friendly geothermal and recovered energy-based power plants, in most cases using equipment that we design and manufacture.

Our geothermal power plants include both power plants that we have built and power plants that we have acquired, while all of our recovered energy-based plants have been constructed by us. We conduct our business activities in two business segments, which we refer to as our Electricity Segment and Product Segment. In our Electricity Segment, we develop, build, own and operate geothermal and recovered energy-based power plants in the United States and geothermal power plants in other countries around the world, and sell the electricity they generate. We have recently decided to expand our activities in the Electricity Segment to include the ownership and operation of power plants that produce electricity generated by solar-photovoltaic (PV) systems that we do not manufacture. In our Product Segment, we design, manufacture and sell equipment for geothermal and recovered energy-based electricity generation, remote power units and other power generating units and provide services relating to the engineering, procurement, construction, operation and maintenance of geothermal and recovered energy power plants. Both our Electricity Segment and Product Segment operations are conducted in the United States and throughout the world. Our current generating portfolio includes geothermal power plants in the United States, Guatemala, Kenya, and Nicaragua, as well as recovered energy generation (REG) power plants in the United States. During the nine months ended September 30, 2010 and 2009, our consolidated power plants generated 2,735,018 MWh and 2,454,862 MWh, respectively.

For the nine months ended September 30, 2010, our Electricity Segment revenues represented approximately 77.8% of our total revenues, while our Product Segment revenues represented approximately 22.2% of our total revenues during such period. For the nine months ended September 30, 2009, our Electricity Segment revenues represented approximately 59.7% of our total revenues, while our Product Segment revenues represented approximately 40.3% of our total revenues, during such period.

For the nine months ended September 30, 2010, our total revenues decreased by 11.8% (from $317.8 million to $280.4 million) over the same period last year. Revenues from the Electricity Segment increased by 15.0%, while revenues from the Product Segment decreased by 51.5%. As discussed below and in our previous quarterly report for the six months ended June 30, 2010, this decrease is attributable to the decline in our Product Segment customer orders, and we expect this downward fluctuation to affect revenues from our Product Segment at least for the remainder of the year.

For the nine months ended September 30, 2010, total Electricity Segment revenues from the sale of electricity by our consolidated power plants were $218.3 million, compared to $189.8 million for the nine months ended September 30, 2009. In addition, revenues from our 50% ownership of the Mammoth complex in the period from January 1, 2010 to August 1, 2010 (the date we acquired the remaining 50% interest in the Mammoth complex) and in the nine months ended September 30, 2009 were $5.7 million and $7.4 million, respectively. This additional data is a Non-Generally Accepted Accounting Principles (Non-GAAP) financial measure, as defined by the SEC. There is no comparable GAAP measure. We believe that such Non-GAAP data is useful to the readers as it provides a more complete view of the scope of activities of the power plants that we operate. Our investment in the Mammoth complex prior to our acquisition of the remaining 50% interest was accounted for in our consolidated financial statements under the equity method, and the revenues were not included in our consolidated revenues for the period from January 1, 2010 to August 1, 2010 nor for the nine-month period ended September 30, 2009.

For the nine months ended September 30, 2010, revenues attributable to our Product Segment were $62.1 million, compared to $128.0 million for the nine months ended September 30, 2009, a decrease of 51.5%. The decrease is due to a decline in our Product Segment customer orders.

Revenues from our Electricity Segment are relatively predictable, as they are derived from sales of electricity generated by our power plants pursuant to long-term PPAs. The price for electricity under all but one of our PPAs is effectively a fixed price at least through May 2012. The exception is the PPA of the Puna power plant. It has a monthly variable energy rate based on the local utility’s avoided cost, which is the incremental cost that the power purchaser avoids by not having to generate such electrical energy itself or purchase it from others. In the nine months ended September 30, 2010, the variable energy rate in the Puna power plant decreased significantly mainly as a result of lower oil prices, which in turn impacted the gross margin in our Electricity Segment. In the nine months ended September 30, 2010, 86.5% of our electricity revenues were derived from contracts with fixed energy rates, and therefore most of our electricity revenues were not affected by the fluctuations in energy commodity prices. However, electricity revenues are subject to seasonal variations and can be affected by higher-than average ambient temperatures, as described below under the heading “Seasonality.” Revenues attributable to our Product Segment are based on the sale of equipment and the provision of various services to our customers. These revenues may vary significantly from period to period because of the timing of our receipt of purchase orders and the progress of our execution of each project.

Our management assesses the performance of our two segments of operation differently. In the case of our Electricity Segment, when making decisions about potential acquisitions or the development of new projects, we typically focus on the internal rate of return of the relevant investment, relevant technical and geological matters and other relevant business considerations. We evaluate our operating projects based on revenues and expenses, and our projects that are under development based on costs attributable to each such project. We evaluate the performance of our Product Segment based on the timely delivery of our products, performance quality of our products and costs actually incurred to complete customer orders compared to the costs originally budgeted for such orders.

### Recent Developments

- Since the beginning of 2010, we have entered into new lease agreements covering approximately 65,580 acres of federal or private land in Nevada, Utah, Hawaii, Oregon, and California.
- In November 2010, our subsidiary, Ormat Systems Ltd. signed a joint venture agreement with Sunday Energy Ltd. (Sunday), a private company incorporated under the laws of Israel, to develop, construct and operate solar PV energy systems in Israel with a total capacity of 22 MW of roof top installation. This is a second joint venture agreement between the parties. The first agreement was signed in October 2009. Sunday will contribute the rights to all of its property required to develop solar energy systems to special purpose entities (SPEs). Ormat Systems Ltd. will own 51% of each SPE. The electricity generated from the projects will be sold to Israel Electric Corporation Ltd. under 20-year long-term PPAs.
- On October 29, 2010 we and Nevada Geothermal Power Inc. (NGP) have agreed to jointly develop, construct, own and operate one or more geothermal power plants in the Crump Geyser Area located in Lake County, Oregon. All activities will be carried out through Crump Geothermal Company LLC (CGC), a limited liability company that will be owned equally by our wholly owned subsidiary, Ormat Nevada Inc. (Ormat Nevada) and NGP.

We will be the engineering, procurement and construction (EPC) contractor for the project, which will utilize our proprietary generating and other balance of plant equipment. We will also be the Operator and provide operating and maintenance (O&M) services to CGC.

The parties intend to build an up to 30 MW power plant, which is expected to be placed in service before the end of 2013 in order to qualify for the United States Department of Treasury (Treasury) Cash Grant under Section 1603 of the American Recovery and Reinvestment Act of 2009 (ARRA). The parties also intend to apply for a Department of Energy loan guarantee under Section 1705 of the ARRA.

- In October 2010, we invested $2 million in Watts & More Ltd. (W&M), an early stage start-up company, engaged in the development of energy harvesting and system balancing solutions for electrical sources and, in particular, PV systems. We now hold approximately 28.6% of W&M’s shares.
- We are part of a consortium that consists of international and Israeli organizations (including a university), which has won an Israeli governmental tender for the establishment and management of a Technology Center for Renewable Energies (the Center). The Center will be established in the Arava area in Israel. We hold 5.2% of the Center’s shares and are responsible for 4% of the total investment of $11 million to be invested over five years.
- In September 2010, we received from the Treasury $108.3 million in a cash grant for Specified Energy Property in Lieu of Tax Credits relating to our North Brawley geothermal power plant under Section 1603 of the ARRA.
- On August 25, 2010, we declared commercial operation of the 5.5 MW OREG 3 (GRE) power plant that converts recovered waste heat from the exhaust of an existing gas turbine at a compressor station located along a natural gas pipeline near Martin County, Minnesota. The electricity produced by the power plant is sold under a 20-year PPA to Great River Energy.
- On August 3, 2010, we entered into a trust instrument governing the issuance of, and accepted subscriptions for an aggregate principal amount of approximately $142 million of senior unsecured bonds (the Bonds). We issued the bonds outside the United States to investors who are not “U.S. persons” in an unregistered offering pursuant to, and subject to the requirements of, Regulation S under the Securities Act of 1933, as amended. Subject to early redemption, the principal of the bonds is

34 repayable in a single bullet payment upon the final maturity of the Bonds on August 1, 2017. The Bonds bear interest at a fixed rate of 7% per annum, payable semi-annually.

- On August 2, 2010, we acquired the remaining 50% interest (14.5 MW) in Mammoth Pacific, LP (Mammoth Pacific), an entity that owns the Mammoth complex, for a purchase price of $72.5 million in cash. Following the acquisition, we became the sole owner of the Mammoth complex, and have the rights to over 10,000 acres of undeveloped federal lands which will enable us to expand the facility and substantially increase its generation capacity.

Following the acquisition, Mammoth Pacific, which had been previously accounted for under the equity method, has been included in our consolidated financial statements effective August 2, 2010. The acquisition-date fair value of the initial 50% equity interest was $64.9 million. We recognized in the three and nine-month periods ended September 30, 2010, a pre-tax gain of $36.9 million, which is equal to the difference between the acquisition-date fair value of the initial 50% equity interest in Mammoth Pacific and the acquisition-date carrying value of such investment.

- In July 2010, our subsidiary, Ormat Nevada, engaged John Hancock Life Insurance Company (U.S.A.) (John Hancock) to arrange senior secured construction and term loan facilities under a DOE loan guarantee program of up to $350 million for three geothermal projects currently under construction in Nevada. The three projects are the McGinness Hills, Jersey Valley and Tuscarora geothermal projects. Construction of all three projects has already commenced with commercial operation of the first phase of each project is expected between 2011 and 2013. John Hancock and the DOE will conduct a due diligence review of the three projects. Upon the satisfactory completion of the review, John Hancock and the DOE will consider issuing a conditional commitment which will lead to a loan guarantee.
- On June 2, 2010, Alaska Governor Sean Parnell signed Alaska Senate Bill 243. This bill significantly reduces the annual royalty rate paid from geothermal production on state lands from a minimum of 10% of gross revenues to the same level paid on Federal land. Following the passage of Alaska Senate Bill 243, we announced that we will accelerate geothermal exploration work on our Mount Spurr lease that we had won through a competitive bid in October 2008.
- The Alaska Energy Authority (AEA) has recently approved a $2 million grant from the Renewable Energy Grant Fund to support our exploration and drilling work at Mount Spurr. We expect to sign the grant contract during the fourth quarter of 2010. The grant will reimburse us for eligible costs as from July 1, 2010. In the summer of 2010 we drilled two core holes, and in 2011 we will continue exploration activities. The goal for the Renewable Energy Grant is to promote renewable energy projects throughout the state, with a focus on rural Alaska where current diesel-based power prices are very high. The state has appropriated a total of $250 million for this program in an attempt to distribute the funds over five years, of which $25 million are allocated for the 2010 fiscal year (July 2010 to July 2011).
- On April 26, 2010, the Medco-Ormat-Itochu-Kyushu Consortium, which consists of Medco Energi Internasional Tbk, Ormat International Inc., our wholly owned subsidiary, Itochu Corporation and Kyushu Electric Power Co. Inc., signed the “Sarulla Project Joint Confirmation” with the state-owned Indonesian power company PT Perusahaan Listrik Negara (PLN) confirming an agreement on terms for amending the Energy Sales Contract (ESC), with the concession holder PT Pertamina Geothermal Energy (PGE), a wholly owned subsidiary of the Indonesian state-owned oil and gas company PT Pertamina (Persero), signing as witness. The ESC had been executed in December 2007 for the 330 MW net power Sarulla Geothermal Project. The Sarulla Project Joint Confirmation was signed during the opening ceremony of the World Geothermal Congress in Bali.

The parties have agreed to change the price of the power sold under the ESC to a levelized payment of 6.79 cents per kWh, whereby the tariff payable in the early years after commercial operation date shall be higher and shall be reduced in the later years. The 90-day schedule for resolving certain other contractual amendments for facilitation of project financing and for signing the resulting amended ESC has expired and negotiations are still ongoing. The modified tariff itself is subject to verification by the

State Audit Agency for Development and approval from the Minister of Energy and Mineral Resources.

- In February 2010, we signed a letter of intent with Kenya Power and Lighting Co. Ltd. (KPLC), the off-taker, of the Olkaria III complex located in Naivasha, Kenya, to amend the existing PPA by expanding the Olkaria III complex by up to 52 MW within the framework of the existing PPA. The expansion is to be developed in two phases. Phase I will be comprised of 36 MW, to be completed within 3.5 years from finalizing the amendment to the existing PPA. An optional phase II may be comprised of up to 16 MW, to be completed within 4.5 years from finalizing the amendment to the existing PPA. The amendment to the existing PPA is subject to applicable governmental approvals and the consent of the lenders that provided the financing to the existing power plant.
- In February 2010, we signed an agreement to acquire 100% of the membership interests in HSS II, LLC, which owns the Tuscarora Project in the northern Independence Valley of northeast Nevada. The project is in an advanced stage of development and has one successful well. We plan to construct and operate a geothermal plant on the site, the first phase of 16 MW of which is expected to become operational in 2012, and sell electricity under a new PPA, which we signed with Nevada Power Company (a subsidiary of NV Energy, Inc.).
- In January 2010, the North Brawley geothermal power plant in California was placed in service and is currently operating at a stable capacity of 25 MW. Southern California Edison Company (Southern California Edison), the PPA off-taker, agreed to extend the firm operation date until March 31, 2011.
- In January 2010, we were awarded a geothermal exploration concession in Chile. The concession is on approximately 26,000 acres located to the north of the San Pablo/San Pedro twin volcanic complex in northern Chile and is close to access roads and to copper mines that could be potential users of the electricity. We plan to engage in preliminary testing and studies to assess the feasibility of the site for commercial development in accordance with the milestones set forth in the concession.
- In January 2010, we sold our interest in GDL for NZ$3.5 million (approximately US$2.8 million), and we were repaid a loan we had made to GDL with an outstanding balance of NZ$24.3 million (approximately US$17.6 million).

### Trends and Uncertainties

The geothermal industry in the United States has historically experienced significant growth followed by a consolidation of owners and operators of geothermal power plants. During the 1990s, growth and development in the geothermal industry occurred primarily in foreign markets and only minimal growth and development occurred in the United States. Since 2001, there has been increased demand for energy generated from geothermal resources in the United States as costs for electricity generated from geothermal resources have become more competitive relative to fossil fuel generation. This has partly been due to increasing natural gas and oil prices during much of this period and, equally important, to newly enacted legislative and regulatory requirements and incentives, such as state renewable portfolio standards and federal tax credits. The recently enacted ARRA further encourages the use of geothermal energy through production or investment tax credits as well as cash grants (which are discussed in more detail in the section entitled “Government Grants and Tax Benefits”). We see the increasing demand for energy generated from geothermal and other renewable resources in the United States and the further introduction of renewable portfolio standards as significant trends affecting our industry today and in the immediate future. Our operations and the trends that from time to time impact our operations are subject to market cycles.

We expect to continue to generate the majority of our revenues from our Electricity Segment through the sale of electricity from our power plants. All of our current revenues from the sale of electricity are derived from fully-contracted long-term PPAs. We also intend to continue to pursue growth in our recovered energy business. We expect our Product Segment revenues in 2010 to be significantly lower than the 2009 revenues in such segment.

Although other trends, factors and uncertainties may impact our operations and financial condition, including many that we do not or cannot foresee, we believe that our results of operations and financial condition for the foreseeable future will be affected by the following trends, factors and uncertainties:

- The global recession that began in late 2007 has resulted in reduced demand for energy in a number of the markets we serve. If these conditions continue or worsen, they may adversely affect both our Electricity and Product Segments. Among other things, we might face: (i) potential declines in revenues in our Products Segment due to reduced orders or other factors caused by economic challenges faced by our customers and prospective customers; (ii) potential declines in revenues from some of our existing geothermal power projects as a result of curtailed electricity demand and low oil and gas prices; and (iii) potential adverse impacts on our customers’ ability to pay, when due, amounts payable to us. In addition, we may experience related increases in our cost of capital associated with any increased working capital or borrowing needs we may have if our customers do not pay, or if we are unable to collect amounts payable to us in full (or at all) if any of our customers fail or seek protection under applicable bankruptcy or insolvency laws. In addition, the cost of obtaining financing for our project needs may increase or such financing may be more difficult to obtain.
- Our primary focus continues to be the implementation of our organic growth through exploration, development, the construction of new projects and enhancements of existing projects. We expect that this investment in organic growth will increase our total generating capacity, consolidated revenues and operating income attributable to our Electricity Segment year over year. We are continuously looking at acquisition opportunities.
- In the United States, we expect to continue to benefit from the increasing demand for renewable energy. Thirty-six states and the District of Columbia, including California, Nevada and Hawaii (where we have been most active in geothermal development and in which all of our U.S. geothermal projects are located) have adopted renewable portfolio standards (RPS), renewable portfolio goals or other similar laws. These laws require that an increasing percentage of the electricity supplied by electric utility companies operating in such states be derived from renewable energy resources until certain pre-established goals are met. We expect that the additional demand for renewable energy from utilities in such states will outpace a possible reduction in general demand for energy due to the economic slow down and will continue to create opportunities for us to expand existing projects and build new power plants.
- We expect that the increased awareness of climate change may result in significant changes in the business and regulatory environments, which may create business opportunities for us going forward. In May 2010, the EPA announced the “Tailoring Rule’’, which sets thresholds for when permitting requirements under the Clean Air Act’s Prevention of Significant Deterioration and Title V programs will apply to certain major sources of greenhouse gas emissions. The EPA plans on phasing in the Tailoring Rule starting in 2011. Federal legislation or additional federal regulations addressing climate change are possible. Several states and regions are already addressing climate change. For example, the California Global Warming Solutions Act of 2006, which was signed into law in September 2006, regulates most sources of greenhouse gas emissions and aims to reduce greenhouse gas emissions to 1990 levels by 2020, representing an approximately 30% reduction in greenhouse gas emissions from projected 2020 levels. The California Air Resources Board is expected to put in place measures for implementing the Global Warming Solutions Act of 2006 by 2012. However, Proposition 23, entitled the “California Jobs Initiative” will be voted on by the California electorate in November 2010. If passed, Proposition 23 would suspend the effectiveness of the greenhouse gas emission limits and regulations that were passed as part of the California Global Warming Solutions Act of 2006 until the State’s unemployment level drops below 5.5 percent for four consecutive quarters. In September of 2006, California also passed Senate Bill 1368, which prohibits the state’s utilities from entering into long-term financial commitments for base-load generation with power plants that fail to meet a CO2 emission performance standard established by the California Energy Commission and the California Public Utilities Commission. California’s long-term climate change goals are reflected in Executive Order S-3-05, which requires a reduction in greenhouse gases to: (i) 2000 levels by 2010; (ii) 1990 levels by 2020; and (iii) 80% of 1990 levels by 2050. In addition to California, twenty-two other states

37 have set greenhouse gas emissions targets or goals (Arizona, Colorado, Connecticut, Florida, Hawaii, Illinois, Maine, Maryland, Massachusetts, Michigan, Minnesota, Montana, New Hampshire, New Jersey, New Mexico, New York, Oregon, Rhode Island, Utah, Vermont, Virginia and Washington). Regional initiatives, such as the Western Climate Initiative (which includes seven U.S. states and four Canadian provinces) and the Midwest Greenhouse Gas Reduction Accord, are also being developed to reduce greenhouse gas emissions and develop trading systems for renewable energy credits. In September 2008, the first-in-the-nation auction of CO2 allowances was held under the RGGI, a regional cap-and-trade system, which includes ten Northeast and Mid-Atlantic States. Under RGGI, the ten participating states plan to stabilize power section carbon emissions at their capped level, and then reduce the cap by 10% at a rate of 2.5% each year between 2015 and 2018. In addition, twenty-nine states and the District of Columbia have all adopted RPS and seven other states have adopted renewable portfolio goals. In November 2008, California, by Executive Order S-14-08, adopted a goal for all retailers of electricity to serve 33% of their load with renewable energy by 2020, and in September of 2009, Executive Order S-21-09 directed the California Air Resources Board to adopt regulations consistent with the 33% renewable energy target.

- Outside of the United States, we expect that a variety of governmental initiatives will create new opportunities for the development of new projects, as well as create additional markets for our products. These initiatives include the award of long-term contracts to independent power generators, the creation of competitive wholesale markets for selling and trading energy, capacity and related energy products and the adoption of programs designed to encourage “clean” renewable and sustainable energy sources.
- We expect competition from the wind and solar power generation industry to continue. The current demand for renewable energy is large enough that this increased competition has not materially impacted our ability to obtain new PPAs. However, the increase in competition and in the amount of renewable energy under contract may contribute to a reduction in electricity prices. Despite increased competition from the wind and solar power generation industry, we believe that baseload electricity, such as geothermal-based energy, will continue to be a leading source of renewable energy in areas with commercially viable geothermal resources.
- We expect increased competition from binary power plant equipment suppliers. While we believe that we have a distinct competitive advantage based on our accumulated experience and current worldwide share of installed binary generation capacity, which is in excess of 90%, an increase in competition may impact our ability to secure new purchase orders from potential customers. The increased competition also may lead to a reduction in prices that we are able to charge for our binary equipment, which in turn may impact our profitability.
- We also expect increased competition from new developers which may impact the prices and availability of new leases for geothermal resource.
- While the current demand for renewable energy is large enough that increased competition has not impacted our ability to obtain new PPAs and new leases, increased competition in the power generation space may contribute to a reduction in electricity prices, and increased competition in geothermal leasing may contribute to an increase in lease costs.
- The viability of a geothermal resource depends on various factors such as the resource temperature, the permeability of the resource (i.e., the ability to get geothermal fluids to the surface) and operational factors relating to the extraction and injection of the geothermal fluids. Such factors, together with the possibility that we may fail to find commercially viable geothermal resources in the future, represent significant uncertainties we face in connection with our operations.
- As our power plants age, they may require increased maintenance with a resulting decrease in their availability, potentially leading to the imposition of penalties if we are not able to meet the requirements under our PPAs as a result of such decrease in availability.
- Our foreign operations are subject to significant political, economic and financial risks, which vary by country. These risks include the partial privatization of the electricity sector in Guatemala, labor unrest

38 in Nicaragua and the political uncertainty currently prevailing in some of the countries in which we operate. Although we maintain political risk insurance for most of our foreign power plants to mitigate these risks, insurance does not provide complete coverage with respect to all such risks.

- On May 4, 2009, President Obama and the U.S. Treasury Department proposed changing certain of the U.S. tax rules for U.S. corporations doing business outside the United States. The proposed changes would limit the ability of U.S. corporations doing business through controlled foreign subsidiaries to deduct expenses attributable to offshore earnings, modify the foreign tax credit rules and further restrict the ability of U.S. corporations to transfer funds between foreign subsidiaries without triggering a requirement to pay U.S. income tax. Although the scope of the proposed changes is unclear, it is possible that these or other changes in the U.S. tax laws may increase our U.S. income tax liability and adversely affect our profitability.
- The Energy Policy Act of 2005 authorizes the Federal Energy Regulatory Commission (FERC) to revise the Public Utility Regulatory Policies Act (PURPA) so as to terminate the obligation of electric utilities to purchase the output of a Qualifying Facility if FERC finds that there is an accessible competitive market for energy and capacity from the Qualifying Facility. The legislation does not affect existing PPAs. We do not expect this change in law to affect our U.S. projects significantly, as all except one of our current contracts (our Steamboat 1 power plant, which sells its electricity to Sierra Pacific Power Company on a year-by-year basis) are long-term. FERC issued a final rule that makes it easier to eliminate the utilities’ purchase obligation in four regions of the country. None of those regions includes a state in which our current projects operate. However, FERC has the authority under the Energy Policy Act of 2005 to act, on a case-by-case basis, to eliminate the mandatory purchase obligation in other regions. If the utilities in the regions in which our domestic projects operate were to be relieved of the mandatory purchase obligation, they would not be required to purchase energy from us upon termination of the existing PPAs, which could have an adverse effect on our revenues.

### Revenues

We generate our revenues from the sale of electricity from our geothermal and recovered energy-based power plants; the design, manufacturing and sale of equipment for electricity generation; and the construction, installation and engineering of power plant equipment.

Revenues attributable to our Electricity Segment are relatively predictable as they are derived from the sale of electricity from our power plants pursuant to long-term PPAs. However, such revenues are subject to seasonal variations, as more fully described below in the section entitled “Seasonality”. Electricity Segment revenues may also be affected by higher-than-average ambient temperatures, which could cause a decrease in the generating capacity of our power plants, and by unplanned major maintenance activities related to our power plants.

Our PPAs generally provide for the payment of energy payments, or energy and capacity payments. Generally, capacity payments are payments calculated based on the amount of time that our power plants are available to generate electricity. Some of our PPAs provide for bonus payments in the event that we are able to exceed certain target levels and the potential forfeiture of payments if we fail to meet minimum target levels. Energy payments, on the other hand, are payments calculated based on the amount of electrical energy delivered to the relevant power purchaser at a designated delivery point. The rates applicable to such payments are either fixed (subject, in certain cases, to certain adjustments) or are based on the relevant power purchaser’s short run avoided costs (the incremental costs that the power purchaser avoids by not having to generate such electrical energy itself or purchase it from others). Our more recent PPAs generally provide for energy payments along with an obligation to compensate the off-taker for its incremental costs as a result of shortfalls in our supply.

The prices paid for electricity pursuant to the PPA of the Puna power plant are tied to the price of oil. Accordingly, our revenues for that power plant, which accounted for approximately 8.3% of our total revenues for the nine-month period ended September 30, 2010, may be volatile.

Revenues attributable to our Product Segment are generally less predictable than revenues from our Electricity Segment. This is because larger customer orders for our products are typically a result of our participating in, and winning, tenders or requests for proposals issued by potential customers in connection with projects they are developing. Such projects often take a long time to design and develop and are often subject to various contingencies such as the customer’s ability to raise the necessary financing for a project. As a result, we are generally unable to predict the timing of such orders for our products and may not be able to replace existing orders that we have completed with new ones. As a result, our revenues from our Product Segment fluctuate (and at times, extensively) from period to period. As discussed under “Trends and Uncertainties” above, we may experience declines in revenues in our Product Segment due to reduced orders or other factors caused by the global recession and economic challenges faced by our customers and prospective customers.

The following table sets forth a breakdown of our revenues for the periods indicated:

*Revenues in Thousands*

| Revenues | Three Months Ended September 30, 2010 | 2009 | Nine Months Ended September 30, 2010 | 2009 | % of Revenues for Period Indicated Three Months Ended September 30, 2010 | 2009 | Nine Months Ended September 30, 2010 | 2009 |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Electricity Segment | $83,357 | $67,913 | $218,269 | $189,799 | 82.1% | 57.1% | 77.8% | 59.7% |
| Product Segment | 18,120 | 51,113 | 62,128 | 128,037 | 17.9 | 42.9 | 22.2 | 40.3 |
| Total | $101,477 | $119,026 | $280,397 | $317,836 | 100.0% | 100.0% | 100.0% | 100.0% |

### Geographical Breakdown of Revenues

The following table sets forth the geographic breakdown of the revenues attributable to our Electricity Segment for the periods indicated:

*Revenues in Thousands*

| Electricity Segment: | Three Months Ended September 30, 2010 | 2009 | Nine Months Ended September 30, 2010 | 2009 | % of Revenues for Period Indicated Three Months Ended September 30, 2010 | 2009 | Nine Months Ended September 30, 2010 | 2009 |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| United States | $65,556 | $49,877 | $164,055 | $137,160 | 78.6% | 73.4% | 75.2% | 72.3% |
| Foreign | 17,801 | 18,036 | 54,214 | 52,639 | 21.4 | 26.6 | 24.8 | 27.7 |
| Total | $83,357 | $67,913 | $218,269 | $189,799 | 100.0% | 100.0% | 100.0% | 100.0% |
| Product Segment: |  |  |  |  |  |  |  |  |
| United States | $3,512 | $8,321 | $8,535 | $55,533 | 19.4% | 16.3% | 13.7% | 43.4% |
| Foreign | 14,608 | 42,792 | 53,593 | 72,504 | 80.6 | 83.7 | 86.3 | 56.6 |
| Total | $18,120 | $51,113 | $62,128 | $128,037 | 100.0% | 100.0% | 100.0% | 100.0% |

### Seasonality

The prices paid for the electricity generated by some of our domestic power plants pursuant to our PPAs are subject to seasonal variations. The prices paid for electricity under the PPAs with Southern California Edison Company (Southern California Edison) for the Heber 1 and 2 plants, the Mammoth complex, the Ormesa complex, and the North Brawley plant are higher in the months of June through September. As a result, we receive and will receive in the future higher revenues during such months. The prices paid for electricity pursuant to the PPAs of our projects in Nevada have no significant changes during the year. In the winter, due principally to the lower ambient temperature, our power plants produce more energy and as a result we receive higher energy revenues. However, the higher capacity payments payable by Southern

California Edison in California in the summer months have a more significant impact on our revenues than that of the higher energy revenues generally generated in winter due to increased efficiency. As a result, our electricity revenues are generally higher in the summer than in the winter.

### Breakdown of Cost of Revenues

#### Electricity Segment

The principal expenses attributable to our operating projects include operation and maintenance expenses such as depreciation and amortization, salaries and related employee benefits, equipment expenses, costs of parts and chemicals, costs related to third-party services, lease expenses, royalties, startup and auxiliary electricity purchases, property taxes and insurance and, for the California projects, transmission charges, scheduling charges and purchases of make-up water for use in our cooling towers. Some of these expenses, such as parts, third-party services and major maintenance, are not incurred on a regular basis. This results in fluctuations in our expenses and our results of operations for individual projects from quarter to quarter. Payments made to government agencies and private entities on account of site leases where plants are located are included in cost of revenues. Royalty payments, included in cost of revenues, are made as compensation for the right to use certain geothermal resources and are paid as a percentage of the revenues derived from the associated geothermal rights. For each of the nine-month periods ended September 30, 2010 and 2009, royalties constituted approximately 3.8% of the Electricity Segment revenues.

#### Product Segment

The principal expenses attributable to our Product Segment include materials, salaries and related employee benefits, expenses related to subcontracting activities, transportation expenses and sales commissions to sales representatives. Some of the principal expenses attributable to our Product Segment, such as a portion of the costs related to labor, utilities and other support services are fixed, while others, such as materials, construction, transportation and sales commissions, are variable and may fluctuate significantly, depending on market conditions. As a result, the cost of revenues attributable to our Product Segment, expressed as a percentage of total revenues, fluctuates. Another reason for such fluctuation is that in responding to bids for our products, we price our products and services in relation to existing competition and other prevailing market conditions, which may vary substantially from order to order.

### Cash and Cash Equivalents

Our cash and cash equivalents as of September 30, 2010 increased to $49.2 million from $46.3 million as of December 31, 2009. This increase is principally due to: (i) issuance of an aggregate principal amount of approximately $142.0 million of senior unsecured bonds on August 3, 2010; (ii) $108.3 million received in September 2010 for Specified Energy Property in Lieu of Tax Credits relating to our North Brawley geothermal power plant under Section 1603 of the ARRA; (iii) $79.6 million derived from operating activities during the nine months ended September 30, 2010; and (iv) $19.6 million received from the sale of GDL. The increase in our cash resources was partially offset by: (i) our use of $194.9 million to fund capital expenditures; (ii) net payment of $64.5 million for acquisition of controlling interest in Mammoth Pacific ($72.5 million purchase price less $8.0 million available cash in such subsidiary at the acquisition date); (iii) $37.7 million to repay long-term debt to our parent and to third parties; (iv) a net repayment of $17.5 million against our revolving credit lines with commercial banks; and (v) a net increase of $23.4 million in restricted cash and cash equivalents. Our corporate borrowing capacity under committed lines of credit with different commercial banks as of September 30, 2010 was $402.5 million, as described below in the section entitled “Liquidity and Capital Resources”, of which we utilized $179.8 million (including $63.3 million of letters of credit) as of September 30, 2010.

### Critical Accounting Policies

A comprehensive discussion of our critical accounting policies is included in the “Management’s Discussion and Analysis of Financial Condition and Results of Operations” section in our annual report on Form 10-K for the year ended December 31, 2009.

### New Accounting Pronouncements

On January 1, 2010, we adopted the amended consolidation guidance for variable interest entities. As to the impact of the adoption of this amendment on the consolidated financial statements and the additional disclosure in such consolidated financial statements, see Note 6 to our condensed consolidated financial statements set forth in Item 1 of this quarterly report.

On July 1, 2010, we adopted an accounting standards update that amends and clarifies the guidance on how entities should evaluate credit derivatives embedded in beneficial interests in securitized financial assets. The adoption of this accounting standards update resulted in a reclassification to retained earnings with an offset to other comprehensive income effective July 1, 2010.

See Note 2 to our condensed consolidated financial statements set forth in Item 1 of this quarterly report for additional information regarding new accounting pronouncements.

### Results of Operations

Our historical operating results in dollars and as a percentage of total revenues are presented below. A comparison of the different periods described below may be of limited utility as a result of each of the following: (i) our recent construction of new projects and enhancement of acquired projects; (ii) a significant downward fluctuation in revenues from our Product Segment; and (iii) to a lesser extent the inclusion of the Mammoth complex in our consolidated financial statements beginning on August 2, 2010.

*(In thousands, except*

*(In thousands, except*

| Statements of Operations Historical Data: Revenues: | Three Months Ended September 30, 2010 per share data) | 2009 (As Revised(1)) | Nine Months Ended September 30, 2010 per share data) | 2009 (As Revised(1)) |
| --- | ---: | ---: | ---: | ---: |
| Electricity | $83,357 | $67,913 | $218,269 | $189,799 |
| Product | 18,120 | 51,113 | 62,128 | 128,037 |
|  | 101,477 | 119,026 | 280,397 | 317,836 |
| **Cost of revenues:** |  |  |  |  |
| Electricity | 61,530 | 44,085 | 179,551 | 132,489 |
| Product | 14,764 | 35,780 | 41,316 | 87,265 |
|  | 76,294 | 79,865 | 220,867 | 219,754 |
| **Gross margin:** |  |  |  |  |
| Electricity | 21,827 | 23,828 | 38,718 | 57,310 |
| Product | 3,356 | 15,333 | 20,812 | 40,772 |
|  | 25,183 | 39,161 | 59,530 | 98,082 |
| **Operating expenses:** |  |  |  |  |
| Research and development expenses | 1,252 | 3,863 | 8,133 | 7,151 |
| Selling and marketing expenses | 3,333 | 3,393 | 9,221 | 10,909 |
| General and administrative expenses | 5,780 | 6,437 | 19,796 | 19,554 |
| Write-off of unsuccessful exploration activities | — | 2,367 | 3,050 | 2,367 |
| Operating income | 14,818 | 23,101 | 19,330 | 58,101 |
| **Other income (expense):** |  |  |  |  |
| Interest income | 140 | 157 | 432 | 585 |
| Interest expense, net | (10,961) | (4,358) | (30,101) | (12,063) |
| Foreign currency translation and transaction gains (losses) | 1,074 | 25 | 475 | (1,324) |
| Income attributable to sale of tax benefits | 2,183 | 3,869 | 6,392 | 12,403 |
| Gain on acquisition of controlling interest | 36,928 | — | 36,928 | — |
| Other non-operating income (expense), net | 233 | 246 | (47) | 646 |
| Income from continuing operations, before income taxes and equity in income (losses) of investees | 44,415 | 23,040 | 33,409 | 58,348 |
| Income tax provision | (11,931) | (2,935) | (6,009) | (10,232) |
| Equity in income (losses) of investees, net | (83) | 591 | 942 | 1,496 |
| Income from continuing operations | 32,401 | 20,696 | 28,342 | 49,612 |
| Discontinued operations: |  |  |  |  |
| Income from discontinued operations, net of related tax of $0, $536, $6 and $1,206, respectively | — | 1,251 | 14 | 2,815 |
| Gain on sale of of a subsidiary in New Zealand, net of related tax of $2,000 | — | — | 4,336 | — |
| Net income | 32,401 | 21,947 | 32,692 | 52,427 |
| Net loss attributable to noncontrolling interest | 58 | 80 | 168 | 236 |
| Net income attributable to the Company’s stockholders | $32,459 | $22,027 | $32,860 | $52,663 |
| Earnings per share — basic and diluted: |  |  |  |  |
| Income from continuing operations | $0.71 | $0.45 | $0.62 | $1.10 |
| Income from discontinued operations | — | 0.03 | 0.10 | 0.06 |
| Net income | $0.71 | $0.48 | $0.72 | $1.16 |
| Weighted average number of shares used in computation of earnings per share: |  |  |  |  |
| Basic | 45,431 | 45,413 | 45,431 | 45,379 |
| Diluted | 45,450 | 45,564 | 45,452 | 45,477 |

43

| Statements of Operations Percentage Data: Revenues: | Three Months Ended September 30, 2010 | 2009 (As Revised(1)) | Nine Months Ended September 30, 2010 | 2009 (As Revised(1)) |
| --- | ---: | ---: | ---: | ---: |
| Electricity | 82.1% | 57.1% | 77.8% | 59.7% |
| Product | 17.9 | 42.9 | 22.2 | 40.3 |
|  | 100.0 | 100.0 | 100.0 | 100.0 |
| **Cost of revenues:** |  |  |  |  |
| Electricity | 73.8 | 64.9 | 82.3 | 69.8 |
| Product | 81.5 | 70.0 | 66.5 | 68.2 |
|  | 75.2 | 67.1 | 78.8 | 69.1 |
| **Gross margin:** |  |  |  |  |
| Electricity | 26.2 | 35.1 | 17.7 | 30.2 |
| Product | 18.5 | 30.0 | 33.5 | 31.8 |
|  | 24.8 | 32.9 | 21.2 | 30.9 |
| **Operating expenses:** |  |  |  |  |
| Research and development expenses | 1.2 | 3.2 | 2.9 | 2.2 |
| Selling and marketing expenses | 3.3 | 2.9 | 3.3 | 3.4 |
| General and administrative expenses | 5.7 | 5.4 | 7.1 | 6.2 |
| Write-off of unsuccessful exploration activities | 0.0 | 2.0 | 1.1 | 0.7 |
| Operating income | 14.6 | 19.4 | 6.9 | 18.3 |
| **Other income (expense):** |  |  |  |  |
| Interest income | 0.1 | 0.1 | 0.2 | 0.2 |
| Interest expense, net | (10.8) | (3.7) | (10.7) | (3.8) |
| Foreign currency translation and transaction gains (losses) | 1.1 | 0.0 | 0.2 | (0.4) |
| Income attributable to sale of tax benefits | 2.2 | 3.3 | 2.3 | 3.9 |
| Gain on acquisition of controlling interest | 36.4 | 0.0 | 13.2 | 0.0 |
| Other non-operating income (expense), net | 0.2 | 0.2 | (0.0) | 0.2 |
| Income from continuing operations, before income taxes and equity in income (losses) of investees | 43.8 | 19.4 | 11.9 | 18.4 |
| Income tax provision | (11.8) | (2.5) | (2.1) | (3.2) |
| Equity in income (losses) of investees, net | (0.1) | 0.5 | 0.3 | 0.5 |
| Income from continuing operations | 31.9 | 17.4 | 10.1 | 15.6 |
| Discontinued operations: |  |  |  |  |
| Income from discontinued operations, net of related tax | — | 1.1 | 0.0 | 0.9 |
| Gain on sale of of a subsidiary in New Zealand, net of related tax | — | — | 1.5 | — |
| Net income | 31.9 | 18.4 | 11.7 | 16.5 |
| Net loss attributable to noncontrolling interest | 0.1 | 0.1 | 0.1 | 0.1 |
| Net income attributable to the Company’s stockholders | 32.0% | 18.5% | 11.7% | 16.6% |

(1) Revision of the financial statements for three and nine-month periods ended September 30, 2009

Through the third quarter of 2009, we accounted for exploration and development costs using an accounting method that is analogous to the full cost method used in the oil and gas industry. Under that method, we capitalized costs incurred in connection with the exploration and development of geothermal resources on an “area-of-interest” basis. Each area of interest included a number of potential projects in the state of Nevada that were planned to be operated together with the same operation and maintenance team. Impairment tests were performed on an area-of-interest basis rather than at a single site. Under this methodology, costs associated with projects that we determined are not economically feasible remained capitalized as long as the area-of-interest was not subject to impairment.

Following a periodic review performed by the SEC Staff, we concluded that this accounting treatment was inappropriate in certain respects and restated the consolidated financial statements for the year ended December 31, 2008 to write-off capitalized costs for projects we determined are not economically feasible in the period such determination was made. We also revised our financial statements for the three and nine-month period ended September 30, 2009 to give effect to a write-off of costs associated with a project which we determined in the third quarter of 2009 would not support commercial operations.

The effect of the revision on the results of operations in those periods is presented in Note 1 to our condensed consolidated financial statements set forth in Item 1 of this quarterly report.

### Comparison of the Three Months Ended September 30, 2010 and the Three Months Ended September 30, 2009

### Total Revenues

Total revenues for the three months ended September 30, 2010 were $101.5 million, compared to $119.0 million for the three months ended September 30, 2009, which represented a 14.7% decrease in total revenues. This decrease in total revenues is due to a 64.5% decrease in revenues from our Product Segment from the same period in 2009, while revenues from our Electricity Segment increased by 22.7% from the same period last year.

#### Electricity Segment

Revenues attributable to our Electricity Segment for the three months ended September 30, 2010 were $83.4 million, compared to $67.9 million for the three months ended September 30, 2009, which represented a 22.7% increase in such revenues. This increase is a result of increased electricity generation at most of our power plants from 783,532 MWh in the three months ended September 30, 2009 to 937,402 MWh in the three months ended September 30, 2010. The most significant contributors to the increase in our electricity generation were: (i) an increase in the generation of the Puna power plant due to repair work that was completed in the second quarter of 2010; (ii) the placement in service of our North Brawley power plant in January 2010, with revenues of $5.1 million in the three months ended September 30, 2010; and (iii) the consolidation of the Mammoth complex effective August 2, 2010 with revenues of $3.5 million in the period from August 2, 2010 to September 30, 2010, resulting from the acquisition of the remaining 50% interest in Mammoth Pacific, as discussed above. The increase in our Electricity Segment revenues is also attributable to a slight increase in the average revenue rate of our electricity portfolio from $87 per MWh in the third quarter of 2009 to $89 per MWh in the third quarter of 2010.

#### Product Segment

Revenues attributable to our Product Segment for the three months ended September 30, 2010 were $18.1 million, compared to $51.1 million for the three months ended September 30, 2009, which represented a 64.5% decrease in such revenues. This decrease in our product revenue is a result of a decline in our Product Segment customer orders. As previously disclosed, the Product Segment revenues are volatile and unpredictable. We expect this downward fluctuation to affect revenues from our Product Segment at least for the remainder of this year.

### Total Cost of Revenues

Total cost of revenues for the three months ended September 30, 2010 was $76.3 million, compared to $79.9 million for the three months ended September 30, 2009, which represented a 4.5% decrease in total cost of revenues. This decrease is attributable to a decrease in our Product Segment cost of revenues, as discussed below, which was partially offset by an increase in our Electricity Segment cost of revenues. As a percentage of total revenues, our total cost of revenues for the three months ended September 30, 2010 was 75.2%, compared to 67.1% for the same period in 2009. This increase is mainly attributable to high costs in our North Brawley plant, as described below, as well as the lower volume of the Product Segment revenues.

#### Electricity Segment

Total cost of revenues attributable to our Electricity Segment for the three months ended September 30, 2010 was $61.5 million, which includes $10.1 million (including depreciation) related to the North Brawley power plant, compared to $44.1 million for the three months ended September 30, 2009, which represented a 39.6% increase in total cost of revenues for such segment. The increase over the same period last year is mainly attributable to our North Brawley power plant, which was placed in service in January 2010. We have incurred high costs (including depreciation) associated with operating and maintaining a 50 MW power plant that is operating at a lower rate. The higher costs in the North Brawley power plant increased the cost per MWh in the current quarter compared to the third quarter of 2009. Since March 2010, we have been installing permanent solids removal equipment on the injection flow. This equipment provides better removal efficiency at a fraction of the operating costs that we have seen with disposable cartridges, and we are in the process of implementing this solution on the production wells. Nevertheless, we expect to have high operation expenses in the next few quarters. As a percentage of total electricity revenues, the total cost of revenues attributable to our Electricity Segment for the three months ended September 30, 2010 was 73.8%, compared to 64.9% for the three months ended September 30, 2009. We expect this trend to continue during the remainder of 2010.

#### Product Segment

Total cost of revenues attributable to our Product Segment for the three months ended September 30, 2010 was $14.8 million, compared to $35.8 million for the three months ended September 30, 2009, which represented a 58.7% decrease in total cost of revenues related to such segment. This decrease is attributable to the decrease in product revenues as described above. As a percentage of total Product Segment revenues, our total cost of revenues attributable to this segment for the three months ended September 30, 2010 was 81.5%, compared to 70.0% for the three months ended September 30, 2009. This increase reflects a decrease in our gross margin, which is mainly attributable to the lower volume of Product Segment revenues.

### Research and Development Expenses

Research and development expenses for the three months ended September 30, 2010 were $1.3 million, compared to $3.9 million for the three months ended September 30, 2009, which represented a 67.6% decrease. The decrease in our research and development expenses from the same period last year is primarily attributable to the costs related to an experimental REG plant specifically designed to use the residual energy from the vaporization process at liquefied natural gas regasification terminals, including developing and building a unit at a customer’s premises in Spain, which costs decreased to $0.3 million in the three months ended September 30, 2010, from $1.9 million in the three months ended September 30, 2009. The large decrease is because the majority of the costs related to the experimental REG plant have been incurred through the second quarter of 2010. Construction of the plant commenced in the third quarter of 2010 and is expected to be completed in the first quarter of 2011. If the development of the unit is not successful we will have to remove the unit from the customer’s site. If the unit operates successfully and passes acceptance tests, we will be paid by the customer an amount of approximately $15.0 million which will be recognized as revenue upon acceptance by the customer. Our research and development activities during the three months ended September 30, 2010 also included: (i) continued development of enhanced geothermal systems (EGS); (ii) development of a solar thermal system for the production of electricity; and (iii) research of various solutions related to power plant cooling systems.

### Selling and Marketing Expenses

Selling and marketing expenses for the three months ended September 30, 2010 were $3.3 million, compared to $3.4 million for the three months ended September 30, 2009. Selling and marketing expenses for the three months ended September 30, 2010 constituted 3.3% of total revenues for such period compared to 2.9% for the three months ended September 30, 2009.

### General and Administrative Expenses

General and administrative expenses for the three months ended September 30, 2010 were $5.8 million, compared to $6.4 million for the three months ended September 30, 2009, which represented a 10.2% decrease. General and administrative expenses for the three months ended September 30, 2010 constituted 5.7% of total revenues for such period, compared to 5.4% for the three months ended September 30, 2009.

### Write-off of Unsuccessful Exploration Activities

We did not have any write-offs of unsuccessful exploration activities for the three months ended September 30, 2010. Write-off of unsuccessful exploration activities for the three months ended September 30, 2009 was $2.4 million (as revised), which represents the write-off of exploration costs related to the Rock Hills exploration project in Nevada, which we determined in the third quarter of 2009 would not support commercial operations.

### Operating Income

Operating income for the three months ended September 30, 2010 was $14.8 million, compared to $23.1 million (as revised) for the three months ended September 30, 2009. Such decrease of $8.3 million in operating income was principally attributable to a decrease in the total gross margin due to the decrease in Product Segment revenues and the increase in Electricity Segment cost of revenues. Operating income attributable to our Electricity Segment for the three months ended September 30, 2010 was $13.5 million, compared to $14.7 million (as revised) for the three months ended September 30, 2009, mainly due to the increase in electricity cost of revenues, as explained above. Operating income attributable to our Product Segment for the three months ended September 30, 2010 was $1.4 million, compared to $8.4 million for the three months ended September 30, 2009, due to the decrease in our Product Segment revenues.

### Interest Expense, Net

Interest expense, net, for the three months ended September 30, 2010 was $11.0 million, compared to $4.4 million for the three months ended September 30, 2009, which represented a 151.5% increase. The $6.6 million increase is primarily due to: (i) a decrease of $4.8 million in interest capitalized to projects as a result of decreased aggregate investment in projects under construction; (ii) issuance of senior unsecured bonds on August 3, 2010, in the aggregate principal amount of approximately $142.0 million, as discussed above; and (iii) loan agreements with two groups of institutional investors and a commercial bank in an aggregate total amount of $90.0 million in the third and fourth quarters of 2009. The increase was partially offset by a decrease in interest expense as a result of the acquisition of a thirty percent interest in the Class B membership units of OPC on October 30, 2009 by our subsidiary, Ormat Nevada, as well as principal repayments.

### Foreign Currency Translation and Transaction Gains

Foreign currency translation and transaction gains for the three months ended September 30, 2010 were $1.1 million, compared to $0.1 million for the three months ended September 30, 2009. The $1.0 million increase is primarily due to higher gains on forward foreign exchange transactions which do not qualify as hedge transactions for accounting purposes for the three months ended September 30, 2010, compared to the three months ended September 30, 2009.

### Income Attributable to Sale of Tax Benefits

Income attributable to the sale of tax benefits to institutional equity investors (as described in “OPC Transaction” below) for the three months ended September 30, 2010 was $2.2 million, compared to $3.9 million for the three months ended September 30, 2009. This income represents the value of production tax credits (PTCs) and taxable income or loss generated by OPC and allocated to the investors. The decrease is due to lower depreciation for tax purposes as a result of declining depreciation rates utilizing the Modified Accelerated Cost Recovery System (MACRS) and to our purchase of Class B membership units of OPC from Lehman-OPC on October 30, 2009.

### Gain on acquisition of controlling interest

Gain on acquisition of controlling interest for the three months ended September 30, 2010 was $36.9 million. This gain relates to the acquisition of the remaining 50% interest in Mammoth Pacific as discussed above. The acquisition-date fair value of the previous 50% equity interest was $64.9 million. In three months ended September 30, 2010, we recognized a pre-tax gain of $36.9 million ($22.6 million after tax), which is equal to the difference between the acquisition-date fair value of the initial investment in Mammoth Pacific and the acquisition-date carrying value of such investment.

### Income Taxes

Income tax provision for the three months ended September 30, 2010 was $11.9 million, compared to $2.9 million (as revised) for the three months ended September 30, 2009. The effective tax rate for the three months ended September 30, 2010 was 26.9%, compared to 12.7% for the three months ended September 30, 2009. The increase in the effective tax rate primarily resulted from the tax impact of the gain on acquisition of controlling interest as discussed above, offset partially by the PTCs which reduce the effective tax rate for the third quarter of 2010 as a result of our lower pre-tax income from continuing operations (excluding the gain on acquisition of controlling interest). Excluding the gain on acquisition of controlling interest, we expect to recognize an income tax benefit during 2010 due to the significance of the forecasted PTCs in relation to our forecasted pretax income from continuing operations.

### Equity in Income (Losses) of Investees

Our participation in the losses generated from our investees for the three months ended September 30, 2010 was $0.1 million, compared to income of $0.6 million for the three months ended September 30, 2009. The amount is derived mainly from our 50% ownership of the Mammoth complex which was included in the Company’s consolidated financial statements effective August 2, 2010, as a result of our acquisition of the remaining 50% interest in Mammoth Pacific. For the third quarter of 2010, the amount represents our share in the loss of the Mammoth complex in the period from July 1, 2010 to August 1, 2010.

### Income from Continuing Operations

Income from continuing operations for the three months ended September 30, 2010 was $32.4 million, compared to $20.7 million (as revised) for the three months ended September 30, 2009. Such increase of $11.7 million in income from continuing operations was principally attributable to: (i) gain on acquisition of controlling interest in the amount of $36.9 million; and (ii) a $1.0 million increase in foreign currency transaction and translation gains. The increase was partially offset by: (i) an $8.3 million decrease in operating income; (ii) a $6.6 million increase in interest expense, net; (iii) a $1.7 million decrease in income attributable to the sale of tax benefits; and (iv) a $9.0 million increase in income tax provision.

### Discontinued Operations

In January 2010, a former shareholder of GDL exercised a call option to purchase from us our shares in GDL for approximately $2.8 million. We did not exercise our right of first refusal and, therefore, we transferred our shares in GDL to the former shareholder. The operations of GDL have been included in discontinued operations for all periods prior to the sale of GDL.

### Net Income

Net income for the three months ended September 30, 2010 was $32.4 million, compared to $21.9 million (as revised) for the three months ended September 30, 2009. Such increase in net income was principally attributable to the increase in income from continuing operations in the amount of $11.7 million, as discussed above.

### Comparison of the Nine Months Ended September 30, 2010 and the Nine Months Ended September 30, 2009

### Total Revenues

Total revenues for the nine months ended September 30, 2010 were $280.4 million, compared to $317.8 million for the nine months ended September 30, 2009, which represented an 11.8% decrease in total revenues. The decrease in our total revenues is due to a 51.5% decrease in our Product Segment revenues, while revenues from our Electricity Segment increased by 15.0% from the same period last year.

#### Electricity Segment

Revenues attributable to our Electricity Segment for the nine months ended September 30, 2010 were $218.3 million, compared to $189.8 million for the nine months ended September 30, 2009, which represented a 15.0% increase in such revenues. This increase is a result of increased electricity generation at most of our power plants from 2,454,862 MWh in the nine months ended September 30, 2009 to 2,735,018 MWh in the nine months ended September 30, 2010. The most significant contributors to the increase in our electricity generation were: (i) an increase in the generation of the Puna power plant due to repair work that was completed in the second quarter of 2010; (ii) the placement in service of our North Brawley power plant in January 2010, with revenues of $11.3 million in the nine months ended September 30, 2010; and (iii) the consolidation of the Mammoth complex effective August 2, 2010 with revenues of $3.5 million in the period from August 2, 2010 to September 30, 2010, resulting from the acquisition of the remaining 50% interest in Mammoth Pacific, as discussed above. The increase in our Electricity Segment revenues is also attributable to a slight increase in the average revenue rate of our electricity portfolio from $77 per MWh in the nine months ended September 30, 2009 to $80 per MWh in the nine months ended September 30, 2010.

#### Product Segment

Revenues attributable to our Product Segment for the nine months ended September 30, 2010 were $62.1 million, compared to $128.0 million for the nine months ended September 30, 2009, which represented a 51.5% decrease in such revenues. This decrease in our product revenue is a result of a decline in our Product Segment customer orders, which we have previously discussed.

### Total Cost of Revenues

Total cost of revenues for the nine months ended September 30, 2010 was $220.9 million, compared to $219.8 million for the nine months ended September 30, 2009. This slight increase is attributable to an increase in our Electricity Segment cost of revenues, which was offset by a decrease in our Product Segment cost of revenues, as discussed below. As a percentage of total revenues, our total cost of revenues for the nine months ended September 30, 2010 was 78.8%, compared to 69.1% for the same period in 2009. This increase is mainly attributable to high costs in our North Brawley plant, as described below, as well as the lower volume of the Product Segment revenues.

#### Electricity Segment

Total cost of revenues attributable to our Electricity Segment for the nine months ended September 30, 2010 was $179.6 million, which includes $31.5 million (including depreciation) related to our North Brawley power plant, compared to $132.5 million for the nine months ended September 30, 2009, which represented a 35.5% increase in total cost of revenues for such segment. The increase over the same period last year is mainly attributable to our North Brawley power plant which was placed in service in January 2010. We have incurred high costs (including depreciation) associated with operating and maintaining a 50 MW power plant that is operating at a lower rate. The higher costs in the North Brawley power plant increased the cost per MWh for the nine months ended September 30, 2010, compared to the nine months ended September 30, 2009. As a percentage of total electricity revenues, the total cost of revenues attributable to our Electricity Segment for the nine months ended September 30, 2010 was 82.3%, compared to 69.8% for the nine months ended September 30, 2009.

#### Product Segment

Total cost of revenues attributable to our Product Segment for the nine months ended September 30, 2010 was $41.3 million, compared to $87.3 million for the nine months ended September 30, 2009, which represented a 52.7% decrease in total cost of revenues related to such segment. This decrease is attributable to the decrease in product revenues, as described above. As a percentage of total Product Segment revenues, our total cost of revenues attributable to this segment for the nine months ended September 30, 2010 was 66.5%, compared to 68.2% for the nine months ended September 30, 2009. This percentage decrease is attributable to the removal of a contingency relating to a project that was substantially completed in the second quarter of 2010.

### Research and Development Expenses

Research and development expenses for the nine months ended September 30, 2010 were $8.1 million, compared to $7.2 million for the nine months ended September 30, 2009, which represented a 13.7% increase. The increase is primarily attributable to the costs related to the experimental REG plant in the amount of $5.3 million (in addition to $7.5 million recorded in the year ended December 31, 2009) compared to $3.8 million for the nine months ended September 30, 2009. Our research and development activities during the nine months ended September 30, 2010 also included: (i) continued development of EGS; (ii) development of a solar thermal system for the production of electricity; and (ii) research of various solutions related to power plant cooling systems.

### Selling and Marketing Expenses

Selling and marketing expenses for the nine months ended September 30, 2010 were $9.2 million, compared to $10.9 million for the nine months ended September 30, 2009, which represented a 15.5% decrease. The decrease was due primarily to the decrease in Product Segment revenues. Selling and marketing expenses for the nine months ended September 30, 2010 constituted 3.3% of total revenues for such period, compared to 3.4% for the nine months ended September 30, 2009.

### General and Administrative Expenses

General and administrative expenses for the nine months ended September 30, 2010 and 2009 were $19.8 million, compared to $19.6 million for the nine months ended September 30, 2009. General and administrative expenses for the nine months ended September 30, 2010 constituted 7.1% of total revenues for such period, compared to 6.2% for the nine months ended September 30, 2009.

### Write-off of Unsuccessful Exploration Activities

Write-off of unsuccessful exploration activities for the nine months ended September 30, 2010 was $3.1 million, compared to $2.4 million (as revised) for the nine months ended September 30, 2009. Write-off of unsuccessful exploration activities for the nine months ended September 30, 2010 relates to the Gabbs Valley exploration project in Nevada, which we determined in the second quarter of 2010 would not support commercial operations. Write-off of unsuccessful exploration activities for the nine months ended September 30, 2009 relates to the Rock Hills exploration project in Nevada, which we determined in the third quarter of 2009 would not support commercial operations.

### Operating Income

Operating income for the nine months ended September 30, 2010 was $19.3 million, compared to $58.1 million (as revised) for the nine months ended September 30, 2009. Such decrease of $38.8 million in operating income was principally attributable to a decrease in the total gross margin due to the decrease in Product Segment revenues and the increase in Electricity Segment cost of revenues. Operating income attributable to our Electricity Segment for the nine months ended September 30, 2010 was $11.4 million, compared to $35.2 million (as revised) for the nine months ended September 30, 2009, mainly due to the increase in electricity cost of revenues, as explained above. Operating income attributable to our Product Segment for the nine months ended September 30, 2010 was $7.9 million, compared to $22.9 million for the nine months ended September 30, 2009, mainly due to the decrease in product revenues, as explained above.

### Interest Expense, Net

Interest expense, net, for the nine months ended September 30, 2010 was $30.1 million, compared to $12.1 million for the nine months ended September 30, 2009, which represented a 149.5% increase. The $18.0 million increase is primarily due to: (i) a decrease of $13.2 million in interest capitalized to projects as a result of decreased aggregate investment in projects under construction; (ii) an increase in interest expenses related to our long-term project finance loans of the Olkaria III and Amatitlan power plants; (iii) borrowings under our revolving credit lines with banks; (iv) loan agreements with two groups of institutional investors and a commercial bank in the third and fourth quarter of 2009; and (v) issuance of senior unsecured bonds on August 3, 2010, as discussed above. The increase was partially offset by a decrease in interest expense as a result of the acquisition of a thirty percent interest in the Class B membership units of OPC on October 30, 2009 by our subsidiary, Ormat Nevada, as well as principal repayments.

### Foreign Currency Translation and Transaction Gains (Losses)

Foreign currency translation and transaction gains for the nine months ended September 30, 2010 were $0.5 million, compared to losses of $1.3 million for the nine months ended September 30, 2009. The $1.8 million increase is primarily due to higher gains on forward foreign exchange transactions which do not qualify as hedge transactions for accounting purposes for the nine months ended September 30, 2010, compared to losses for the nine months ended September 30, 2009.

### Income Attributable to Sale of Tax Benefits

Income attributable to the sale of tax benefits to institutional equity investors (as described in “OPC Transaction” below) for the nine months ended September 30, 2010 was $6.4 million, compared to $12.4 million for the nine months ended September 30, 2009. This income represents the value of PTCs and taxable income or loss generated by OPC and allocated to the investors. The decrease is due to lower depreciation for tax purposes as a result of declining depreciation rates utilizing MACRS and to our purchase of Class B membership units of OPC from Lehman-OPC.

### Gain on acquisition of controlling interest

Gain on acquisition of controlling interest for the nine months ended September 30, 2010 was $36.9 million. This gain relates to the acquisition of the remaining 50% interest in Mammoth Pacific as discussed above. The acquisition-date fair value of the previous 50%-equity interest was $64.9 million. In the nine months ended September 30, 2010, we recognized a pre-tax gain of $36.9 million ($22.4 million after tax), which is equal to the difference between the acquisition-date fair value of the initial investment in Mammoth Pacific and the acquisition-date carrying value of such investment.

### Income Taxes

Income tax provision for the nine months ended September 30, 2010 was $6.0 million, compared to $10.2 million (as revised) for the nine months ended September 30, 2009. The effective tax rate for the nine months ended September 30, 2010 was 18.0%, compared to 17.5% for the nine months ended September 30,

2009\. The fluctuation in the effective tax rate primarily resulted from the tax impact of the gain on acquisition of controlling interest as discussed above, offset by the PTCs which reduce the effective tax rate for the nine months ended September 30, 2010 as a result of our low pre-tax income from continuing operations (excluding the gain on acquisition of controlling interest), partially offset by a valuation allowance recorded in 2010 relating to capital loss carryovers. Excluding the gain on acquisition of controlling interest, we expect to recognize an income tax benefit during 2010 due to the significance of the forecasted PTCs in relation to our forecasted pretax income from continuing operations.

### Equity in Income of Investees

Our participation in the income generated from our investees for the nine months ended September 30, 2010 was $0.9 million, compared to $1.5 million for the nine months ended September 30, 2009. The amount is derived mainly from our 50% ownership of the Mammoth complex which was included in the Company’s consolidated financial statements effective August 2, 2010, as a result of the acquisition of the remaining 50% interest in Mammoth Pacific. For the first nine months of 2010, the amount represents our share in the income of the Mammoth complex in the period from January 1, 2010 to August 1, 2010.

### Income from Continuing Operations

Income from continuing operations for the nine months ended September 30, 2010 was $28.3 million, compared to $49.6 million (as revised) for the nine months ended September 30, 2009. Such decrease of $21.3 million in income from continuing operations was principally attributable to: (i) a $38.8 million decrease in operating income; (ii) an $18.0 million increase in interest expense; and (iii) a $6.0 million decrease in income attributable to the sale of tax benefits. This was partially offset by: (i) a $1.8 million increase in foreign currency transaction and translation gains; (ii) gain on acquisition of controlling interest of $36.9 million; and (iii) a $4.2 million decrease in income tax provision.

### Discontinued Operations

In January 2010, a former shareholder of GDL exercised a call option to purchase from us our shares in GDL for approximately $2.8 million. We did not exercise our right of first refusal and, therefore, we transferred our shares in GDL to the former shareholder. As a result, we recorded an after-tax gain of $4.3 million in the nine months ended September 30, 2010. The operations of GDL have been included in discontinued operations for all periods prior to the sale of GDL.

### Net Income

Net income for the nine months ended September 30, 2010 was $32.7 million, compared to $52.4 million (as revised) for the nine months ended September 30, 2009. Such decrease in net income was principally attributable to the decrease in income from continuing operations in the amount of $21.3 million, as discussed above, partially offset by the gain on the sale of shares in GDL in the amount of $4.3 million, net of related income taxes.

### Liquidity and Capital Resources

Our principal sources of liquidity have been derived from cash flows from operations, the issuance of our common stock in public and private offerings, proceeds from third party debt in the form of borrowings under credit facilities and private offerings, issuance by Ormat Funding Corp. (OFC) and OrCal Geothermal Inc. (OrCal) of their respective Senior Secured Notes, project financing (including the Puna lease and the OPC Transaction described below), and a cash grant we received under the ARRA in respect of the North Brawley power plant. We have utilized this cash to fund our acquisitions (including the acquisition of the remaining 50% ownership of the Mammoth complex in August 2010), to develop and construct power generation plants, and to meet our other cash and liquidity needs.

As of September 30, 2010, we have access to the following sources of funds: (i) $49.2 million in cash and cash equivalents; and (ii) $222.7 million of unused corporate borrowing capacity under existing committed lines of credit with different commercial banks.

Our estimated capital needs for the rest of 2010 include approximately $132 million for capital expenditures on new projects in development or construction, exploration activity, operating projects, and machinery and equipment, as well as $24.2 million for debt repayment.

We expect to finance these requirements with: (i) the sources of liquidity described above; (ii) cash flows from our operations; (iii) additional borrowing capacity under future lines of credit with commercial banks that are under negotiations; and (iv) future project financing and refinancing. Management believes that these sources will address our anticipated liquidity, capital expenditures and other investment requirements. Our shelf registration statement on Form S-3, which was declared effective on October 2, 2008, provides us with the ability to raise additional capital of up to $1.5 billion through the issuance of securities, subject to market conditions.

### Third Party Debt

Our third party debt is composed of two principal categories. The first category consists of project finance debt or acquisition financing that we or our subsidiaries have incurred for the purpose of developing and constructing, refinancing or acquiring our various projects, which are described under the heading “Non-Recourse and Limited-Recourse Third Party Debt”. The second category consists of debt incurred by us or our subsidiaries for general corporate purposes, which are described under the heading “Full-Recourse Third Party Debt”.

### Non-Recourse and Limited-Recourse Third Party Debt

#### OFC Senior Secured Notes — Non Recourse

On February 13, 2004, OFC, one of our subsidiaries, issued $190.0 million, 81/4% Senior Secured Notes (OFC Senior Secured Notes) in an offering subject to Rule 144A and Regulation S of the Securities Act of 1933, as amended (the Securities Act), for the purpose of refinancing the acquisition cost of the Brady, Ormesa and Steamboat 1/1A power plants, and the financing of the acquisition cost of the Steamboat 2/3 power plants. The OFC Senior Secured Notes have a final maturity date of December 30, 2020. Principal and interest on the OFC Senior Secured Notes are payable in semi-annual payments which commenced on September 30, 2004. The OFC Senior Secured Notes are collateralized by substantially all of the assets of OFC and those of its wholly owned subsidiaries and are fully and unconditionally guaranteed by all of the wholly owned subsidiaries of OFC. There are various restrictive covenants under the OFC Senior Secured Notes, which include limitations on additional indebtedness and payment of dividends. As of September 30, 2010, OFC was in compliance with the covenants under the OFC Senior Secured Notes. As of September 30, 2010, there were $141.4 million of OFC Senior Secured Notes outstanding.

#### OrCal Secured Notes — Non-Recourse

On December 8, 2005, OrCal, one of our subsidiaries, issued $165.0 million, 6.21% Senior Secured Notes (OrCal Senior Secured Notes) in an offering subject to Rule 144A and Regulation S of the Securities Act, for the purpose of refinancing the acquisition cost of the Heber power plants. The OrCal Senior Secured Notes have been rated BBB- by Fitch. The OrCal Senior Secured Notes have a final maturity date of December 30, 2020. Principal and interest on the OrCal Senior Secured Notes are payable in semi-annual payments that commenced on September 30, 2006. The OrCal Senior Secured Notes are collateralized by substantially all of the assets of OrCal and those of its wholly owned subsidiaries and are fully and unconditionally guaranteed by all of the wholly owned subsidiaries of OrCal. There are various restrictive covenants under the OrCal Senior Secured Notes, which include limitations on additional indebtedness and payment of dividends. As of September 30, 2010, OrCal was in compliance with the covenants under the OrCal Senior Secured Notes. As of September 30, 2010, there were $103.2 million of OrCal Senior Secured Notes outstanding.

#### Olkaria III Loan — Non-Recourse

OrPower 4, Inc. (OrPower 4), has a project financing loan of $105.0 million which refinanced its investment in the 48 MW Olkaria III geothermal power plant located in Kenya. The loan was provided by a group of European Development Finance Institutions (DFIs) arranged by DEG — Deutsche Investitions-und Entwicklungsgesellschaft mbH (DEG). The loan will mature on December 15, 2018, and will be payable in 19 equal semi-annual installments, commencing December 15, 2009. Interest on the loan is variable based on 6-month LIBOR plus 4.0%. We fixed the interest rate on $77.0 million of the loan at 6.90% per annum. There are various restrictive covenants under the loan, which include limitations on OrPower 4’s ability to make distributions to its shareholders. As of September 30, 2010, OrPower 4 was in compliance with the covenants under the loan. As of September 30, 2010, $93.9 million of the Olkaria III loan was outstanding.

#### Amatitlan Loan — Non-Recourse

Ortitlan Limitada (Ortitlan), entered into a note purchase agreement in an aggregate principal amount of $42.0 million which refinanced its investment in the 20 MW Amatitlan geothermal power plant located in Amatitlan, Guatemala. The loan was provided by TCW Global Project Fund II, Ltd. (TCW). The loan will mature on June 15, 2016, and will be payable in 28 quarterly installments, commencing September 15, 2009. The annual interest rate on the loan is 9.83%, but the effective cost for us is approximately 8%, due to the elimination, following the refinancing, of the political risk insurance premiums that we had been paying on our equity investment in the project. There are various restrictive covenants under the loan, which include limitations on Ortitlan’s ability to make distributions to its shareholders. Management believes that as of September 30, 2010, Ortitlan was in compliance with the covenants under the loan. As of September 30, 2010, $39.5 million of the Amatitlan loan was outstanding.

#### Senior Loan from International Finance Corporation (IFC) — (The Zunil Power Plant) — Non-Recourse

Orzunil I de Electricidad, Limitada (Orzunil), a wholly owned subsidiary in Guatemala, has a senior loan agreement with IFC. The loan, of which $2.1 million was outstanding as of September 30, 2010, has a fixed annual interest rate of 11.775%, and matures on November 15, 2011. There are various restrictive covenants under the senior loan, which include limitations on Orzunil’s ability to make distributions to its shareholders. As of September 30, 2010, Orzunil was in compliance with the covenants under this senior loan.

### New Financing of Our Projects

#### Financing of the North Brawley Power Plant

We refinanced a portion of the equity invested in the North Brawley power plant with the cash grant we received under the ARRA in September 2010, and we intend to refinance a portion of the remainder with long-term debt of up to $100 million that we are currently negotiating with a financial institution.

#### Financing for Jersey Valley, McGinness Hills and Tuscarora Projects in Nevada

Our subsidiary, Ormat Nevada, has engaged John Hancock to arrange senior secured construction and term loan facilities under a United States DOE loan guarantee program of up to $350 million for three geothermal projects currently under construction in Nevada. The three projects are the McGinness Hills, Jersey Valley and Tuscarora geothermal projects. Construction of all three projects has already commenced with commercial operation of the first phase of each project expected between 2011 and 2013.

The availability of the credit facilities is subject to various conditions, including execution of mutually satisfactory documentation and approval of the DOE.

John Hancock and the DOE will conduct a due diligence review of the three projects. Upon the satisfactory completion of the review, John Hancock and the DOE will consider issuing a conditional commitment which will lead to a loan guarantee.

### Full-Recourse Third Party Debt

In December 2008, our subsidiary, Ormat Nevada, entered into an amendment of its credit agreement with Union Bank, N.A. (Union Bank), extending the final maturity of the facility and increasing its total amount to $37.5 million. Under the credit agreement, Ormat Nevada can request extensions of credit in the form of loans and/or the issuance of one or more letters of credit. Union Bank is currently the sole lender and issuing bank under the credit agreement, but is also designated as an administrative agent on behalf of banks that may, from time to time in the future, join the credit agreement as parties thereto. In connection with this transaction, we have entered into a guarantee in favor of the administrative agent for the benefit of the banks, pursuant to which we agreed to guarantee Ormat Nevada’s obligations under the credit agreement. Ormat Nevada’s obligations under the credit agreement are otherwise unsecured by any of its (or any of its subsidiaries’) assets.

Loans and draws under the letters of credit (if any) under the credit agreement will bear interest at a floating rate based on the Eurodollar plus a margin. There are various restrictive covenants under the credit agreement, which include maintaining certain levels of tangible net worth, leverage ratio, minimum coverage ratio, and a distribution coverage ratio. In addition, there are restrictions on dividend distributions in the event of a payment default or noncompliance with such ratios, and Ormat Nevada is subject to a negative pledge in favor of Union Bank.

As of September 30, 2010, letters of credit in the aggregate amount of $34.4 million remain issued and outstanding under this credit agreement with Union Bank.

We also have credit agreements with five commercial banks for an aggregate amount of $365.0 million. Under these credit agreements, we or our Israeli subsidiary, Ormat Systems Ltd., can request extensions of credit in the form of loans in the amount of up to $315.0 million and/or the issuance of one or more letters of credit in the amount of up to $365.0 million. The credit agreements mature between December 2010 and September 2013.

Loans and draws under the credit agreements or under any letters of credit will bear interest at the respective bank’s cost of funds plus a margin.

As of September 30, 2010, loans in the total amount of $116.5 million were outstanding, and letters of credit in the total amount of $28.9 million remain issued and outstanding under such credit agreements.

We have a $20.0 million term loan with a group of financial institutions, which matures on July 16, 2015, is payable in 12 semi-annual installments commencing January 16, 2010, and bears annual interest of 6.5%. As of September 30, 2010, $17.2 million was outstanding under this loan.

We have a $20.0 million term loan with a group of financial institutions, which matures on August 1, 2017, is payable in 12 semi-annual installments commencing February 1, 2012, and bears interest at 6-month LIBOR plus 5.0%. As of September 30, 2010, $20.0 million was outstanding under this loan.

We have a $50.0 million term loan with a commercial bank, which matures on November 10, 2014, and is payable in 10 semi-annual installments commencing May 10, 2010, and bears interest at 6-month LIBOR plus 3.25%. As of September 30, 2010, $45.0 million was outstanding under this loan.

On August 3, 2010, we entered into a trust instrument governing the issuance of, and accepted subscriptions for an aggregate principal amount of approximately $142.0 million of senior unsecured bonds (the Bonds). We issued the Bonds outside the United States to investors who are not “U.S. persons” in an unregistered offering pursuant to, and subject to the requirements of, Regulation S under the Securities Act.

Subject to early redemption, principal of the Bonds is repayable in a single bullet payment upon the final maturity of the Bonds on August 1, 2017. The Bonds bear interest at a fixed rate of 7% per annum, payable semi-annually. We intend to use the proceeds of the Bonds for general corporate purposes, which may include the repayment of existing indebtedness and the acquisition, directly or indirectly, of additional energy assets, including by way of construction, enhancement and expansion of its existing projects.

Our obligations under the credit agreements, the loan agreements and the trust agreement governing the Bonds, described above, are unsecured, but we are subject to a negative pledge in favor of the banks and the other lenders and certain other restrictive covenants. These include, among other things, a prohibition on: (i) creating any floating charge or any permanent pledge, charge or lien over our assets without obtaining the prior written approval of the lender; (ii) guaranteeing the liabilities of any third party without obtaining the prior written approval of the lender; and (iii) selling, assigning, transferring, conveying or disposing of all or substantially all of our assets. In some cases, we have agreed to maintain certain financial ratios such as a debt service coverage ratio, a debt to equity ratio, and a debt to EBITDA ratio. There are also certain restrictions on distribution of dividends. The failure to perform or observe any of the covenants set forth in such agreements, subject to various cure periods, would result in the occurrence of an event of default and would enable the lenders to accelerate all amounts due under each such agreement.

Some of the credit agreements, the loan agreements and the trust agreement governing the Bonds contain cross-default provisions with respect to other material indebtedness owed by us to any third party.

We are currently in compliance with our covenants with respect to these credit and loan agreements, and believe that the restrictive covenants, financial ratios and other terms of any of our (or Ormat Systems’) full-recourse bank credit agreements will not materially impact our business plan or plan of operations.

### Letters of Credit

Some of our customers require our project subsidiaries to post letters of credit in order to guarantee their respective performance under relevant contracts. We are also required to post letters of credit to secure our obligations under various leases and licenses and may, from time to time, decide to post letters of credit in lieu of cash deposits in reserve accounts under certain financing arrangements. In addition, our subsidiary, Ormat Systems, is required from time to time to post performance letters of credit in favor of our customers with respect to orders of products.

Two commercial banks have issued such performance letters of credit in favor of our customers from time to time. As of September 30, 2010, such banks have issued us letters of credit totaling $22.0 million. These letters of credit were not issued under the credit agreements discussed under “Full-Recourse Third Party Debt” above.

In addition, we and certain of our subsidiaries may request letters of credit under the credit agreements with Union Bank and five other commercial banks as described above under “Full-Recourse Third Party Debt”. As of September 30, 2010, letters of credit in the aggregate amount of $63.3 million remained issued and outstanding under the Union Bank credit agreement and our other agreements with commercial banks.

### Puna Project Lease Transactions

On May 19, 2005, our subsidiary in Hawaii, Puna Geothermal Venture (PGV), entered into a transaction involving the Puna geothermal power plant located on the Big Island of Hawaii. The transaction was concluded with financing parties by means of a leveraged lease transaction. A secondary stage of the lease transaction relating to two new geothermal wells that PGV drilled in the second half of 2005 (for production and injection) was completed on December 30, 2005. Pursuant to a 31-year head lease, PGV leased its geothermal power plant to the abovementioned financing parties in return for deferred lease payments by such financing parties to PGV in the aggregate amount of $83.0 million.

### OPC Transaction

In September 2007, our wholly owned subsidiary, Ormat Nevada, entered into agreements with affiliates of Morgan Stanley & Co. Incorporated and Lehman Brothers Inc. (Morgan Stanley Geothermal LLC and Lehman-OPC), under which those investors purchased, for cash, interests in a newly formed subsidiary of Ormat Nevada, OPC, entitling the investors to certain tax benefits (such as PTCs and accelerated depreciation) and distributable cash associated with four geothermal power plants.

The first closing under the agreements occurred in 2007 and covered the Company’s Desert Peak 2, Steamboat Hills and Galena 2 power plants. The investors paid $71.8 million at the first closing. The second closing under the agreements occurred in 2008 and covered the Galena 3 power plant. The investors paid $63.0 million at the second closing.

Ormat Nevada continues to operate and maintain the power plants and will receive initially all of the distributable cash flow generated by the power plants until it recovers the capital that it has invested in the power plants, while the investors will receive substantially all of the PTCs and the taxable income or loss, and the distributable cash flow after Ormat Nevada has recovered its capital. The investors’ return is limited by the term of the transaction. Once the investors reach a target after-tax yield on their investment in OPC (the Flip Date), Ormat Nevada will receive 95% of both distributable cash and taxable income, on a going forward basis. Following the Flip Date, Ormat Nevada also has the option to buy out the investors’ remaining interest in OPC at the then-current fair market value or, if greater, the investors’ capital account balances in OPC. Should Ormat Nevada exercise this purchase option, it would thereupon revert to being sole owner of the power plants.

The Class B membership units are provided with a 5% residual economic interest in OPC. The 5% residual interest commences on achievement by the investors of a contractually stipulated return that triggers the Flip Date. The actual Flip Date is not known with certainty and is determined by the operating results of OPC. This residual 5% interest represents a noncontrolling interest and is not subject to mandatory redemption or guaranteed payments. As a result of the acquisition by Ormat Nevada, on October 30, 2009, of all of the Class B membership units of OPC held by Lehman-OPC LLC (see below), the residual interest decreased to 3.5%.

Our voting rights in OPC are based on a capital structure that is comprised of Class A and Class B membership units. We own, through our subsidiary, Ormat Nevada, all of the Class A membership units, which represent 75% of the voting rights in OPC and 30% of the Class B membership units, which represent 7.5% of the voting rights of OPC, and in total we have 82.5% of the voting rights in OPC. The investors own 70% of the Class B membership units, which represent 17.5% of the voting rights of OPC. Other than in respect of customary protective rights, all operational decisions in OPC are decided by the vote of a majority of the membership units. Following the Flip Date, Ormat Nevada’s voting rights will increase to 96.5% and the investor’s voting rights will decrease to 3.5%. Ormat Nevada retains the controlling voting interest in OPC both before and after the Flip Date and therefore has continued to consolidate OPC.

On October 30, 2009, Ormat Nevada acquired from Lehman-OPC LLC all of the Class B membership units of OPC held by Lehman-OPC LLC pursuant to a right of first offer for a purchase price of $18.5 million.

### Liquidity Impact of Uncertain Tax positions

As discussed in Note 17 to our condensed consolidated financial statements set forth in Item 1 of this quarterly report, we have a liability associated with unrecognized tax benefits and related interest and penalties in the amount of approximately $5.6 million as of September 30, 2010. This liability is included in long-term liabilities in our consolidated balance sheet, because we generally do not anticipate that settlement of the liability will require payment of cash within the next twelve months. We are not able to reasonably estimate when we will make any cash payments required to settle this liability, but believe that the ultimate settlement of our obligations will not materially affect our liquidity.

### Dividend

The following are the dividends declared by us during the past two years:

| Date Declared | Dividend Amount per Share | Record Date | Payment Date |
| --- | ---: | --- | --- |
| November 5, 2008 | $0.05 | November 19, 2008 | December 2, 2008 |
| February 24, 2009 | $0.07 | March 16, 2009 | March 26, 2009 |
| May 8, 2009 | $0.06 | May 20, 2009 | May 27, 2009 |
| August 5, 2009 | $0.06 | August 18, 2009 | August 27, 2009 |
| November 4, 2009 | $0.06 | November 18, 2009 | December 1, 2009 |
| February 23, 2010 | $0.12 | March 16, 2010 | March 25, 2010 |
| May 5, 2010 | $0.05 | May 18, 2010 | May 25, 2010 |
| August 4, 2010 | $0.05 | August 17, 2010 | August 26, 2010 |
| November 2, 2010 | $0.05 | November 17, 2010 | November 30, 2010 |

### Historical Cash Flows

The following table sets forth the components of our cash flows for the relevant periods indicated:

*(Dollars in thousands)*

|  | Nine Months Ended September 30, 2010 | 2009 |
| --- | ---: | ---: |
| Net cash provided by operating activities | $79,644 | $77,696 |
| Net cash used in investing activities | (153,020) | (248,881) |
| Net cash provided by financing activities | 76,309 | 156,919 |
| Translation adjustments on cash and cash equivalents | — | 216 |
| Net change in cash and cash equivalents | 2,933 | (14,050) |

#### For the Nine Months Ended September 30, 2010

Net cash provided by operating activities for the nine months ended September 30, 2010 was $79.6 million, compared to $77.7 million for the nine months ended September 30, 2009. The net increase of $1.9 million resulted primarily from: (i) a decrease in net income to $32.7 million in the nine months ended September 30, 2010, from $52.4 million in the nine months ended September 30, 2009, mainly as a result of the decrease in operating income, as described above; (ii) gain on acquisition of controlling interest of $36.9 million; and (iii) a gain on sale of GDL of $6.4 million in the nine months ended September 30, 2010. Such decrease was partially offset by: (i) an increase of $15.7 million in depreciation and amortization mainly due to the placement in service of our North Brawley power plant in January 2010, as described above; (ii) an increase in receivables of $5.7 million in the nine months ended September 30, 2010, compared to $10.1 million in the nine months ended September 30, 2009; and (iii) a net decrease in costs and estimated earnings in excess of billings on uncompleted contracts of $15.3 million in the nine months ended September 30, 2010, compared to a net increase of $27.1 million in the nine months ended September 30, 2009.

Net cash used in investing activities for the nine months ended September 30, 2010 was $153.0 million, compared to $248.9 million for the nine months ended September 30, 2009. The principal factors that affected our net cash used in investing activities during the nine months ended September 30, 2010 were: (i) capital expenditures of $194.9 million, primarily for our facilities under construction; (ii) net payment of $64.5 million for acquisition of controlling interest in Mammoth Pacific ($72.5 million purchase price less $8.0 million available cash in such subsidiary at the acquisition date); and (iii) net increase of $23.4 million in restricted cash, cash equivalents and marketable securities, offset by: (i) $108.3 million received in September 2010 for Specified Energy Property in Lieu of Tax Credits relating to our North Brawley geothermal power plant under Section 1603 of the ARRA; and (ii) $19.6 million cash received from the sale of GDL. The principal factors that affected our net cash used in investing activities during the nine months ended September 30, 2009 were capital expenditures of $212.3 million, primarily for our power facilities under construction, and a $36.2 million increase in restricted cash, cash equivalents and marketable securities.

Net cash provided by financing activities for the nine months ended September 30, 2010 was $76.3 million, compared to $156.9 million for the nine months ended September 30, 2009. The principal factor that affected the net cash provided by financing activities during the nine months ended September 30, 2010 was the issuance of an aggregate amount of approximately $142.0 million senior unsecured bonds on August 3, 2010 offset by: (i) the repayment of long-term debt in the amount of $37.7 million; (ii) a net decrease of $17.5 million against our revolving lines of credit with commercial banks; and (iii) the payment of a dividend to our shareholders in the amount of $10.0 million. The principal factors that affected our net cash provided by financing activities during the nine months ended September 30, 2009 were: (i) the proceeds of $105.0 million from the Olkaria III Loans; (ii) the proceeds of $42.0 million from the Amatitlan Loan; (iii) the $12.0 million drawn under revolving lines of credit from commercial banks; and (iv) $40.0 million proceeds from long term loan agreements with two groups of institutional investors, offset by: (i) the repayment of debt to our parent in the amount of $16.6 million; (ii) the payment of a dividend to our shareholders in the amount of $8.6 million; and (iii) the repayment of long-term debt in the amount of $13.0 million.

### Adjusted EBITDA

Adjusted EBITDA for the three months ended September 30, 2010 was $78.8 million, compared to $48.0 million (as restated) for the three months ended September 30, 2009. Adjusted EBITDA for the nine months ended September 30, 2010 was $134.9 million, compared to $125.1 million (as restated) for the nine months ended September 30, 2009. Adjusted EBITDA includes consolidated EBITDA and our share in the interest, taxes, depreciation and amortization related to our unconsolidated 50% interest in the Mammoth complex.

We calculate EBITDA as net income before interest, taxes, depreciation and amortization. We calculate adjusted EBITDA to include depreciation and amortization, interest and taxes attributable to our equity investments in the Mammoth complex. EBITDA and adjusted EBITDA are not measurements of financial performance or liquidity under GAAP and should not be considered as an alternative to cash flow from operating activities or as a measure of liquidity or an alternative to net earnings as indicators of our operating performance or any other measures of performance derived in accordance with GAAP. EBITDA and adjusted EBITDA are presented because we believe they are frequently used by securities analysts, investors and other interested parties in the evaluation of a Company’s ability to service and/or incur debt. However, other companies in our industry may calculate EBITDA and adjusted EBITDA differently than we do.

The following table reconciles net cash provided by operating activities to EBITDA and adjusted EBITDA, for the three and nine-month periods ended September 30, 2010 and 2009:

*(In thousands)*

*(In thousands)*

|  | Three Months Ended September 30, 2010 | 2009 (As Revised) | Nine Months Ended September 30, 2010 | 2009 (As Revised) |
| --- | ---: | ---: | ---: | ---: |
| Net cash provided by operating activities | $20,710 | $22,364 | $79,644 | $77,696 |
| Adjusted for: |  |  |  |  |
| Interest expense, net (excluding amortization of deferred financing costs) | 10,271 | 4,074 | 28,046 | 10,201 |
| Interest income | (140) | (157) | (432) | (585) |
| Income tax provision (benefit) | 11,931 | 3,472 | 8,015 | 11,439 |
| Adjustments to reconcile net income to net cash provided by operating activities (excluding depreciation and amortization) | 35,823 | 17,184 | 17,509 | 23,525 |
| EBITDA | 78,595 | 46,937 | 132,782 | 122,276 |
| Interest, taxes, depreciation and amortization attributable to the Company’s equity in Mammoth-Pacific L.P. | 203 | 1,020 | 2,115 | 2,843 |
| Adjusted EBITDA | $78,798 | $47,957 | $134,897 | $125,119 |
| Net cash used in investing activities | $(44,006) | $(90,479) | $(153,020) | $(248,881) |
| Net cash provided by financing activities | $18,341 | $42,400 | $76,309 | $156,919 |

This non-GAAP information is provided to assist investors in performing their financial analysis of our operations for the periods presented. This information should not be considered in isolation or as a substitute for, or superior to, measures of financial performance prepared in accordance with GAAP or other non-GAAP financial measures.

### Capital Expenditures

Our capital expenditures primarily relate to two principal components: (i) the enhancement of our existing power plants; and (ii) the development and construction of new power plants. We expect that the following enhancements of our existing power plants and the construction of new power plants will be funded initially from internally generated cash or other available corporate resources, which we expect to subsequently refinance with limited or non-recourse debt at the project level.

*Puna Project* An enhancement program for the Puna project is underway to increase the output of the project by an estimated 8 MW and improve the performance of the wellfield. The enhancement includes recompletion of the major production and injection wells and the construction of two additional OEC units. Permits to start construction have been obtained and the site construction is at advanced stage. Equipment manufacturing has been completed. We signed a memorandum of understanding and concluded the final terms of the PPA with Hawaii Electric Light Company for the sale of additional electrical power from the Puna project and we are currently waiting for the the Puna power plant lender’s approval. We expect to place the enhancement in service by the end of 2010 or the beginning of 2011. Full commertial operation would require upgrades by the utility that will occur later in 2011.

*Jersey Valley Project* We are currently constructing the Jersey Valley project on Bureau of Land Management leases located in Pershing County, Nevada. We plan to build the project with three units. Field development and production of the power generating unit for the 15MW first phase has been completed; the construction permits have been obtained; and the project is at an advanced construction stage. Completion of construction of the first phase is expected at the end of 2010 or the beginning of 2011.

*McGinness Hills Project* We are currently developing the first phase of the 30 MW McGinness Hills project on Bureau of Land Management leases located in Lander County, Nevada. Basic well field site preparation has been completed and permits to drill have been obtained. Four production wells and two successful injection wells have been drilled and drilling for additional wells is continuing. We have submitted documents to obtain the required construction permits and an Environmental Assessment is in progress. We signed a 20-year PPA with Nevada Power Company, which was approved by the Public Utilities Commission of Nevada (PUCN) on July 28, 2010. Commercial operation of the project’s first phase is expected in 2012.

*Tuscarora Project* We are currently developing the first phase (16 MW) of the Tuscarora project on private land located in Elko County, Nevada. The land, when acquired, contained a drilled production well. We have drilled two successful injection wells and two successful production wells. We have conducted a flow test, and we are continuing with drilling work. We signed a 20-year PPA with Nevada Power Company, which was approved by the PUCN on July 28, 2010. Commercial operation of the project’s first phase is expected in 2012. The National Environmental Policy Act (NEPA) process is in progress in order to comply with the requirements under the DOE 1705 loan guarantee program.

*Carson Lake Project* We are currently developing the 20 MW Carson Lake project on Bureau of Land Management leases located in Churchill County, Nevada. Our initial joint venture with Nevada Power Company for this project contemplated a larger project. We are in preliminary discussions to address the implications of a smaller project.

*Mammoth Complex* We are currently developing 30 MW to 40 MW of new capacity to the Mammoth Complex located in Mammoth Lakes, California, which is comprised mainly by BLM leases. We have started the equipment fabrication for the replacement of the old generating equipment with modern units designed and manufactured by us. The new equipment will increase the annual generation and reduce the operating costs of the old PPAs. In parallel, we have commenced field development and drilled successful production well and drilling of additional wells is continuing. The project is expected to be completed in 2013.

We have estimated approximately $672 million for projects that are currently under construction and expected to be completed by 2013 and have invested approximately $222 million of such estimate as of September 30, 2010. We expect to invest approximately $81 million for these power plants in the rest of 2010 (including the North Brawley power plant).

In addition, we expect to invest approximately $51.1 million through the remainder of 2010 as follows: (i) $118 million in new projects under development; (ii) $7.0 million in capital expenditure in our operating power plants; (iii) $28.3 million in exploration activities in various leases for geothermal resources in which we have started the exploration activity; and (iv) $4 million in our production facilities.

### Exposure to Market Risks

Based on current conditions, we believe that we have sufficient financial resources to fund our activities and execute our business plans. However, the cost of obtaining financing for our project needs may increase significantly or such financing may be difficult to obtain. A prolonged economic slowdown could reduce worldwide demand for energy, including our geothermal energy, REG and other products.

One market risk to which power plants are typically exposed is the volatility of electricity prices. Our exposure to such market risk is currently limited because our long-term PPAs (except for Puna) have fixed or escalating rate provisions that limit our exposure to changes in electricity prices. However, beginning in May 2012, the energy payments under the PPAs of the Heber 1 and 2 power plants, the Ormesa complex and the Mammoth complex will be determined by reference to the relevant power purchaser’s short run avoided costs. The Puna power plant is currently benefiting from energy prices which are higher than the floor under the Puna PPA as a result of the high fuel costs that impact HELCO’s avoided costs.

As of September 30, 2010, 71.4% of our consolidated long-term debt was in the form of fixed rate securities, and therefore, not subject to interest rate volatility risk. As of such date, 28.6% of our debt was in the form of a floating rate instrument, exposing us to changes in interest rates in connection therewith. As of September 30, 2010, $206.4 million of our debt remained subject to some floating rate risk.

We currently maintain our surplus cash in short-term, interest-bearing bank deposits, money market securities and commercial paper (with a minimum investment grade rating of AA by Standard & Poor’s Ratings Services).

Our cash equivalents and our portfolio of marketable securities are subject to market risk due to changes in interest rates. Fixed rate securities may have their market value adversely impacted due to a rise in interest rates, while floating rate securities may produce less income than expected if interest rates fall. Due in part to these factors, our future investment income may fall short of expectation due to changes in interest rates or we may suffer losses in principal if we are forced to sell securities that decline in market value due to changes in interest rates. However, because we classify our debt securities as “available-for-sale”, no gains or losses are recognized due to changes in interest rates unless such securities are sold prior to maturity or declines in fair value are determined to be other-than-temporary. Auction rate securities are securities that are structured with short-term interest rate reset dates of generally less than ninety days but with contractual maturities that can be well in excess of ten years. At the end of each reset period, which depending on the security can occur on a daily, weekly, or monthly basis, investors can sell or continue to hold the securities at par. These securities are subject to fluctuations in fair value depending on the supply and demand at each auction.

Another market risk to which we are exposed is primarily related to potential adverse changes in foreign currency exchange rates, in particular the fluctuation of the U.S. dollar versus the New Israeli Shekel (NIS). Risks attributable to fluctuations in currency exchange rates can arise when we or any of our foreign subsidiaries borrows funds or incurs operating or other expenses in one type of currency but receives revenues in another. In such cases, an adverse change in exchange rates can reduce our or such subsidiary’s ability to meet its debt service obligations, reduce the amount of cash and income we receive from such foreign subsidiary, or increase such subsidiary’s overall expenses. Risks attributable to fluctuations in foreign currency exchange rates can also arise when the currency denomination of a particular contract is not the U.S. dollar. Substantially all of our PPAs in the international markets are either U.S. dollar-denominated or linked to the U.S. dollar. Our construction contracts from time to time contemplate costs which are incurred in local currencies. The way we often mitigate such risk is to receive part of the proceeds from the sale contract in the currency in which the expenses are incurred. Through most of 2009, we did not use any material foreign currency exchange contracts or other derivative instruments to reduce our exposure to this risk. Currently, we have forward and option contracts in place to reduce our foreign currency exposure, and expect to continue to use currency exchange and other derivative instruments to the extent we deem such instruments to be the appropriate tool for managing such exposure. We do not believe that our exchange rate exposure has or will have a material adverse effect on our financial condition, results of operations or cash flows.

### Concentration of Credit Risk

Our credit risk is currently concentrated with a limited number of major customers: Southern California Edison, Hawaii Electric Light Company, and Sierra Pacific Power Company and Nevada Power Company (subsidiaries of NV Energy, Inc.), and Kenya Power and Lighting Co. Ltd. If any of these electric utilities fails to make payments under its PPAs with us, such failure would have a material adverse impact on our financial condition.

Southern California Edison accounted for 36.9% and 24.5% of our total revenues for the three months ended September 30, 2010 and 2009, respectively, and 29.6% and 21.4% of our total revenues for the nine months ended September 30, 2010 and 2009, respectively. Southern California Edison is also the power purchaser and revenue source for our Mammoth complex, which was accounted for under the equity method through August 1, 2010. Following our acquisition of the remaining 50% interest in the Mammoth complex we have included the results of the Mammoth complex in our consolidated financial statements.

Sierra Pacific Power Company and Nevada Power Company accounted for 12.1% and 10.3% of our total revenues for the three months ended September 30, 2010 and 2009, respectively, and 14.8% and 12.0% of our total revenues for the nine months ended September 30, 2010 and 2009, respectively.

Hawaii Electric Light Company accounted for 9.5% and 3.8% of our total revenues for the three months ended September 30, 2010 and 2009, respectively, and 8.3% and 6.1% of our total revenues for the nine months ended September 30, 2010 and 2009, respectively.

Kenya Power and Lighting Co. Ltd. accounted for 8.7% and 7.5% of the Company’s total revenues for the three months ended September 30, 2010 and 2009, respectively, and 9.4% and 8.2% of our total revenues for the nine months ended September 30, 2010 and 2009, respectively.

### Government Grants and Tax Benefits

The U.S. government encourages production of electricity from geothermal resources through certain tax subsidies under the recently enacted ARRA. We are permitted to claim 30% of the eligible costs of each new geothermal power plant in the United States as an ITC against our federal income taxes. Alternatively, we are permitted to claim a PTC, which in 2010 is 2.2 cents per kWh and which is adjusted annually for inflation. The PTC may be claimed for ten years on the electricity output of new geothermal power plants put into service by December 31, 2013. The owner of the project must choose between the PTC and the 30% ITC described above. In either case, under current tax rules, any unused tax credit has a 1-year carry back and a 20-year carry forward. Whether we claim the PTC or the ITC, we are also permitted to depreciate most of the plant for tax purposes over five years on an accelerated basis, meaning that more of the cost may be deducted in the first few years than during the remainder of the depreciation period. If we claim the ITC, our “tax basis” in the plant that we can recover through depreciation must be reduced by half of the tax credit. If we claim a PTC, there is no reduction in the tax basis for depreciation. Companies that begin construction on, or place in service qualifying renewable energy facilities, during 2009 or 2010 may choose to apply for a cash grant from the U.S. Department of Treasury in an amount equal to the ITC. Under the ARRA, the U.S. Department of Treasury is instructed to pay the cash grant within 60 days of the application or the date on which the qualifying facility is placed in service.

Production of electricity from geothermal resources is also supported under the new “Temporary Program For Rapid Deployment of Renewable Energy and Electric Power Transmission Projects” established with the DOE as part of the DOE’s existing Innovative Technology Loan Guarantee Program. The new program: (i) extends the scope of the existing federal loan guarantee program to cover renewable energy projects, renewable energy component manufacturing facilities, and electricity transmission projects that embody established commercial, as well as innovative, technologies; and (ii) provides an appropriation to cover the “credit subsidy costs” of such projects (meaning the estimated average costs to the federal government from issuing the loan guarantee, equivalent to a lending bank’s loan loss reserve).

To be eligible for a guarantee under the new program, a supported project must break ground, and the guarantee must be issued, by September 30, 2011. A project supported by the federal guarantee under the new program must pay prevailing federal wages.

Based on the appropriation of $6 billion dollars to pay the credit subsidy costs of guarantees issued under the new program, it is likely that between $60 billion to $120 billion of financing (assuming average subsidy requirements between 10% and 5%, respectively) will be available to eligible projects, including geothermal power plants.

Our subsidiary, Ormat Systems, received “Benefited Enterprise” status under Israel’s Law for Encouragement of Capital Investments, 1959 (the Investment Law), with respect to two of its investment programs. As a Benefited Enterprise, Ormat Systems was exempt from Israeli income taxes with respect to income derived from the first benefited investment for a period of two years that started in 2004, and thereafter such income is subject to reduced Israeli income tax rates, which will not exceed 25% for an additional five years. Ormat Systems is also exempt from Israeli income taxes with respect to income derived from the second benefited investment for a period of two years that started in 2007, and thereafter such income is subject to reduced Israeli income tax rates which will not exceed 25% for an additional five years. These benefits are subject to certain conditions, including among other things, that all transactions between Ormat Systems and our affiliates are at arms length, and that the management and control of Ormat Systems will be from Israel during the whole period of the tax benefits. A change in control should be reported to the Israeli Tax Authorities in order to maintain the tax benefits. In addition, as an industrial company, Ormat Systems is entitled to accelerated depreciation on equipment used for its industrial activities. Under the provisions of certain tax regulations published in Israel in 2005, industrial companies whose operations are mostly “Eligible Operations” are entitled to claim accelerated depreciation at the rate of 100% on machinery and equipment acquired from July 1, 2005 to December 31, 2006. Accelerated depreciation is to be claimed over two years. In the year in which the equipment was acquired, the regular depreciation rate is to be claimed with the remainder to be claimed in the second year. Under the provisions of certain tax regulations published in Israel in July 2008, industrial companies whose operations are mostly “Eligible Operations” are entitled to claim accelerated depreciation at the rate of 50% on machinery and equipment acquired from June 1, 2008 to May 31, 2009 and placed in service at the later of nine months after acquisition or before May 31, 2009.

## Market risk

As filed, 178 characters.

We incorporate by reference the information appearing under “Exposure to Market Risks” and “Concentration of Credit Risk” in Part I, Item 2 of this quarterly report on Form 10-Q.

## Controls and procedures

As filed, 1,678 characters.

### a. Evaluation of disclosure controls and procedures

Our management, with the participation of our Chief Executive Officer and Chief Financial Officer, evaluated the effectiveness of our disclosure controls and procedures to ensure that the information required to be disclosed in our filings pursuant to Rule 13a-15 under the Securities and Exchange Act of 1934, as amended, is recorded, processed, summarized and reported within the time periods specified in the Securities and Exchange Commission’s rules and forms and to ensure that such information is accumulated and communicated to management, including our Chief Executive Officer and Chief Financial Officer, as appropriate to allow timely decisions regarding required disclosure. Based on that evaluation, as of September 30, 2010, our Chief Executive Officer and Chief Financial Officer have concluded that our disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Securities Exchange Act of 1934, as amended) were effective.

Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Also, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

### b. Changes in internal controls over financial reporting

There were no changes in our internal controls over financial reporting in the third quarter of 2010 that have materially affected or are reasonably likely to materially affect our internal controls over financial reporting.

## Risk factors

As filed, 196 characters.

A comprehensive discussion of our risk factors is included in the “Risk Factors” section of our annual report on Form 10-K for the year ended December 31, 2009 filed with the SEC on March 8, 2010.

Filed Nov 4, 2010.