# Coeur Mining, Inc.: Form 10-Q for the period ended Mar 31, 2011

- Company: [Coeur Mining, Inc.](/companies/cde.md) (CIK 215466)
- Form: 10-Q
- Filed: 2011-05-09
- Accepted by EDGAR: May 9, 2011, 12:31 ET
- Period: 2011-03-31
- Accession: 0000950123-11-047199
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/215466/000095012311047199/v58921e10vq.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/215466/000095012311047199/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2011-03-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2011-01-01 to 2011-03-31 | $199.6m | us-gaap:SalesRevenueGoodsNet |
| Cost of revenue | 3 months, 2011-01-01 to 2011-03-31 | $92.5m | us-gaap:CostOfGoodsSold |
| Gross profit | 3 months, 2011-01-01 to 2011-03-31 | $57.1m | us-gaap:GrossProfit |
| Operating income | 3 months, 2011-01-01 to 2011-03-31 | $38.5m | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2011-01-01 to 2011-03-31 | $9.3m | us-gaap:InterestExpense |
| Income tax | 3 months, 2011-01-01 to 2011-03-31 | $12.9m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2011-01-01 to 2011-03-31 | $12.5m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2011-01-01 to 2011-03-31 | $0.14 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2011-01-01 to 2011-03-31 | $0.14 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2011-01-01 to 2011-03-31 | 89,653,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months, 2011-01-01 to 2011-03-31 | $35.8m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 3 months, 2011-01-01 to 2011-03-31 | $15.9m | us-gaap:PaymentsToAcquireProductiveAssets |
| Cash and equivalents | at 2011-03-31 | $64.4m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2011-03-31 | $286.3m | us-gaap:AssetsCurrent |
| Total assets | at 2011-03-31 | $3.14bn | us-gaap:Assets |
| Current liabilities | at 2011-03-31 | $214.9m | us-gaap:LiabilitiesCurrent |
| Current portion of debt | at 2011-03-31 | $59.1m | us-gaap:DebtCurrent |
| Shareholders' equity | at 2011-03-31 | $2.06bn | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 47,008 characters.

Management’s Discussion and Analysis of Financial Condition and Results of Operations (“MD&A”) is designed to provide the reader of our financial statements with a narrative from management’s perspective on our financial condition, results of operations, liquidity and other factors that may affect our future results. We believe it is important to read our MD&A in conjunction with our Annual Report on Form 10-K for the year ended December 31, 2010, as well as other publicly available information.

This report contains numerous forward-looking statements relating to the Company’s gold and silver mining business, including estimated production data, expected operating schedules, expected capital costs and other operating data and permit and other regulatory approvals. Such forward-looking statements are identified by the use of words such as “believes,” “intends,” “expects,” “hopes,” “may,” “should,” “will,” “plan,” “projected,” “contemplates,” “anticipates” or similar words. Actual production, operating schedules, results of operations, ore reserves and resources could differ materially from those projected in the forward-looking statements. The important factors that could cause actual results to differ materially from those in the forward-looking statements include; (i) the risk factors set forth below under Part II, Item 1A and the risk factors set forth under Item 1A (“Risk Factors”) of the Company’s Annual Report on form 10-K for the year ended December 31, 2010; (ii) risks and hazards inherent in the mining business (including environmental hazards, industrial accidents, weather and geologically related conditions); (iii) changes in the market prices of gold and silver; (iv) uncertainties inherent in the Company’s production, exploratory and developmental activities, including risks relating to permitting and regulatory delays; (v) any future labor disputes or work stoppages; (vi) uncertainties inherent in the estimation of gold and silver ore reserves; (vii) changes resulting from the Company’s future acquisition of new mining properties or businesses; (viii) reliance on third parties to operate certain mines where the Company owns silver production and reserves; (ix) the loss of any third-party smelter to which the Company markets silver and gold; (x) effects of environmental and other governmental regulations; (xi) risks inherent in the ownership or operation of or investment in mining properties or businesses in foreign countries; (xii) the worldwide economic downturn and difficult conditions in the global capital and credit markets; and (xiii) the Company’s possible inability to raise additional financing necessary to conduct its business, make payments or refinance its debt. Readers are cautioned not to put undue reliance on forward-looking statements. The Company disclaims any intent or obligation to update publicly these forward-looking statements, whether as a result of new information, future events or otherwise.

MD&A includes references to total cash operating costs and cash costs per ounce of silver and gold produced, both on an individual mine basis and on a consolidated basis. Total cash operating costs per ounce and cash costs per ounce are measurements that management uses to monitor and evaluate the performance of its mining operations and are not measurements calculated under U.S. GAAP. A reconciliation of total cash operating costs and cash costs per ounce to production expenses, which is calculated under U.S. GAAP, is also provided in the section titled “Operating Statistics” herein and should be referred to when reading the total cash costs per ounce measurement.

#### Introduction to the Company

The Company is a large primary silver producer with growing gold production and has assets located in the United States, Mexico, Bolivia, Argentina and Australia. The Palmarejo mine, San Bartolomé mine, Kensington mine, Rochester mine and Martha mine, each of which is operated by the Company, and the Endeavor mine, which is operated by a non-affiliated party, constituted the Company’s principal sources of mining revenues during the first three months of 2011. Coeur is an Idaho corporation incorporated in 1928.

The Company’s business strategy is to discover, acquire, develop and operate low-cost silver and gold operations that will produce long-term cash flow, provide opportunities for growth through continued exploration, and generate superior and sustainable returns for shareholders. The Company’s management focuses on maximizing cash flow from its existing operations, the main elements of which are silver and gold prices, cash costs of production and capital expenditures. The Company also focuses on reducing its non-operating costs in order to maximize cash flow.

The results of the Company’s operations are significantly affected by fluctuation in prices of silver and gold, which may fluctuate widely and are affected by numerous factors beyond our control, including interest rates, expectations regarding inflation, currency values, governmental decisions regarding the disposal of precious metals stockpiles, global and regional political and economic conditions and other factors. In addition, we face challenges including raising capital, increasing production and managing social, political and environmental issues. Operating costs at our mines are subject to variation due to a number of factors such as changing commodity prices, ore grades, metallurgy, revisions to mine plans and changes in accounting principles. At foreign locations, operating costs are also influenced by currency fluctuations that may affect our U.S. dollar costs.

### Overview of Performance

### Production

In the first quarter of 2011, the Company’s total silver production increased 0.7 million ounces to 4.1 million ounces as compared to 3.4 million ounces in the comparable period in 2010. The increase is primarily due to higher production from Palmarejo and San Bartolomé from the same time period in 2010. The Company’s total gold production in the first quarter of 2010 increased 27,347, or 106.1%, to 53,130 ounces, as compared to 25,782 ounces in the comparable period in 2010. The increase was driven by the Kensington mine, which operated at full capacity during the first quarter of 2011.

### Metal Prices

Sales of metal increased $111.3 million, or 126.1%, to $199.6 million in the first quarter of 2011, compared to $88.3 million in the first quarter of 2010, primarily due to production from the Kensington mine and from substantially higher average realized silver and gold prices. The Company’s average realized silver and gold prices during the first quarter were $31.27 per ounce and $1,374 per ounce, respectively, representing increases of 85.7% and 24.5% respectively, over last year’s first quarter. Silver production contributed 56.4% of the Company’s total metal sales during the first quarter, compared to 68.0% during the first quarter of 2010.

### Earnings

The Company reported a net income of $12.5 million, or $0.14 per share, for the three months ended March 31, 2011. The earnings reflect $5.3 million of non-cash fair value adjustments, driven primarily by higher gold prices which increased the estimated future liabilities related to the Franco-Nevada royalty obligation, gold lease facility and put and call options.

In comparison, the Company had a net loss of $12.9 million, or $0.16 per share during the three months ended March 31, 2010. The net loss reported in the comparable periods of 2010 reflected lower realized silver and gold prices and lower production.

Increases in interest expense during the three months ended March 31, 2011 as compared to the same period in 2010, are primarily due to a decrease in capitalized interest related to placing the Kensington mine into service on July 3, 2010, thereby decreasing capitalized interest in 2010 coupled with new borrowings related to the Kensington Term Facility and the Senior Term Notes due December 31, 2012.

### Other Highlights

In addition to the matters discussed above regarding the key elements of the Company’s business strategy, the matters management considers most important in evaluating the Company’s financial condition and results of operations include:

- The average price of silver (Handy & Harman) and gold (London Gold PM) for the three months ended March 31, 2011 was $32.00 and $1,386 per ounce, respectively, compared to $16.92 and $1,109 per ounce, respectively, on March 31, 2010. The market price of silver and gold on May 6, 2011 was $35.70 per ounce and $1,487 per ounce, respectively.
- The Company produced a total of 4.1 million ounces of silver during in the first quarter of 2011, which was a 19.6% increase over the first quarter of 2010. The Company produced a total of 53,130 ounces of gold during the first quarter of 2011, which was a 106.1% increase over the first quarter of 2010.
- Net cash provided by operating activities in for the first quarter of 2011 was $35.8 million, compared to net cash used in operating activities of $9.2 million during the first quarter of 2010.
- The Company spent $15.9 million on capital expenditures in the first quarter of 2011, which represents a 66.3% decrease from the same time period last year. The majority of the capital expenditures for the first quarter of 2010 were at Kensington, which began commercial production in July of 2010.
- The Company’s ratio of current assets to current liabilities was 1.33 to 1.0, which is a significant increase from .98 to 1.0 at December 31, 2010.
- There was a significant decrease in accrued liabilities and other as a result of the Company’s decision to sell metal on a spot basis as opposed to pre-selling, which it had done during the first quarter of last year and the repayment of the Mitsubishi gold lease position.

### Operating Highlights and Statistics

### Palmarejo Mine:

Production during the first quarter of 2011 was 1.7 million ounces of silver and 27,759 ounces of gold representing increases of 33.0% and 23.0%, respectively, compared to the first quarter of 2010. Production costs applicable to sales increased by 45.9% during the quarter due to an increase in production. Cash operating costs and total cash costs during the first quarter decreased by 11.3% to $4.80 per ounce compared to the first quarter of 2010. The increase in production levels are primarily due to a 52.7% increase in silver ore grades, and 60.0% increase in gold ore grades as compared to last year’s first quarter.

### San Bartolomé Mine:

Silver production for the first quarter of 2011 was 1.7 million ounces of silver, compared to 1.0 million ounces of silver in the first quarter of 2010. Production costs applicable to sales increased by 53.1% during the quarter due to an increase in production. Total cash operating costs per ounce during the first quarter of 2011 were $9.13 and total cash costs per ounce, including royalties and taxes, were $10.47, compared to $9.98 and $10.84, respectively, in the first quarter of 2010. Tons milled increased to 387,668, from 293,106 in the first quarter of 2010. Silver ore grades increased 49.7% as compared to the first quarter of 2010.

On October 14, 2009, COMIBOL announced by resolution that it was temporarily suspending mining activities above the elevation of 4,400 meters above sea level while stability studies of Cerro Rico mountain are undertaken. The Company holds rights to mine above this elevation under valid contracts backed by Supreme Decree with COMIBOL as well as contracts with local mining cooperatives who hold their rights through COMIBOL. The Company temporarily adjusted its mine plan to confine mining activities to the ore deposits below 4,400 meters above sea level and timely notified COMIBOL of the need to lift the restriction. The mine plan has been temporarily adjusted and mining continues on the remainder of the property. In March 2010, San Bartolomé began mining operations in high grade material located in the Huacajchi deposit above the 4,400 meter level under an agreement with the Cooperative Reserva Fiscal, although restrictions on mining above the 4,400 meter level continue. The Huacajchi deposit was confirmed to be excluded from the October 2009 resolution. Access to the Huacajchi deposit and its higher grade material is having a beneficial effect on production and cost at the mine. Other mining areas above the 4,400 meter level continue to be suspended. The Company does not use explosives in its surface-only mining activities and is sensitive to the preservation of the mountain under its contracts with the state-owned mining entity and the local cooperatives.

### Rochester Mine:

Production was 333,696 ounces of silver and 1,451 ounces of gold during the first quarter of 2011 compared to 522,159 ounces of silver and 2,690 ounces of gold in the first quarter of 2010. Production was lower due to continued leach down of the ore on the existing leach pad. Production cost applicable to sales increased by 25.9% during the quarter due to the costs and recoveries associated with the residual heap leaching process. Total cash operating costs per ounce in the first quarter of 2011 were $10.28 and total cash costs per ounce, including production taxes, were $11.86 in the first quarter of 2011 as compared to total cash operating costs per ounce of $1.68 and total cash costs per ounce of $2.35 in the first quarter of 2010. The increase in total cash cost per ounce was primarily due to a decrease in production as described above.

In 2008, the Company commenced studies to investigate the potential to recommence mining and leaching of new material and in 2009 and 2010 completed feasibility studies demonstrating the viability of an expansion of mining and leaching operations at its Rochester mine through 2017. The Company prepared an Amended Plan of Operations for resumption of mining within the existing and permitted Rochester pit and construction of an additional heap leach pad, all within the currently permitted mine boundary. The Bureau of Land Management (BLM) deemed this plan complete in August 2009 under federal regulations and initiated the National Environmental Policy Act process. The BLM issued a positive Decision Record (DR) for the mine to extend silver and gold mining operations by several years with new production ounces expected to begin being recovered in the fourth quarter of 2011.

### Kensington Mine:

The Kensington mine is an underground gold mine that commenced commercial production on July 3, 2010. Production for the first quarter of 2011 was 23,676 ounces of gold. Total cash operating costs per ounce in the first quarter of 2011 were $988.75.

### Martha Mine:

Silver production decreased 50.7% to 179,985 ounces in the first quarter of 2011 compared to 365,226 million ounces in the first quarter of 2010. Production costs applicable to sales decreased by 97.9% during the quarter due to a decrease in silver production. Total cash operating costs per ounce in the first quarter of 2011 were $24.44 and total cash costs per ounce, including royalties and taxes, were $25.46, as compared to $15.47 and $15.95, respectively, during the first quarter of 2010. The decrease in silver production was primarily due to a 51.0% decrease in ore grade.

### Endeavor Mine:

Silver production at the Endeavor mine in the first quarter of 2011 was 149,182 ounces compared to 204,253 ounces in the first quarter of 2010. Production costs applicable to sales increased 34.5% during the quarter due to the increased operating cost contribution. Total cash costs per ounce of silver produced were $17.15 in the first quarter of 2011 compared to $7.40 in the first quarter of 2010. The increase in total cash cost per ounce was primarily due to the price participation component terms of the transaction, in accordance with the silver purchase agreement with CBH Resources Ltd. Under the terms of the price participation component, CDE Australia Pty. Ltd, a subsidiary of the Company, pays an additional operating cost contribution of 50% of the amount by which the silver price exceeds $7.00 per ounce.

As of March 31, 2011, CDE Australia Pty Ltd had recovered approximately 64.0% of the transaction consideration consisting of 3.2 million payable ounces, or 15.6% of the 20.0 million maximum payable silver ounces to which CDE Australia Pty Ltd is entitled under the terms of the silver sale and purchase agreement. No assurances can be made that the mine will achieve its 20.0 million payable silver ounce maximum.

### Operating Statistics from Continuing Operations

The following table presents information by mine and consolidated sales information for the three month period ended March 31, 2011 and 2010:

| Silver Operations: Palmarejo | Three months ended March 31, 2011 | 2010 |
| --- | ---: | ---: |
| Tons milled | 398,740 | 458,006 |
| Ore grade/Ag oz | 5.97 | 3.91 |
| Ore grade/Au oz | 0.08 | 0.05 |
| Recovery/Ag oz | 72.7% | 72.7% |
| Recovery/Au oz | 87.4% | 92.1% |
| Silver production ounces | 1,729,766 | 1,300,593 |
| Gold production ounces | 27,759 | 22,577 |
| Cash operating costs/oz | $4.80 | $5.41 |
| Cash cost/oz | $4.80 | $5.41 |
| Total production cost/oz | $24.40 | $21.39 |
| **San Bartolomé** |  |  |
| Tons milled | 387,668 | 293,106 |
| Ore grade/Ag oz | 5.60 | 3.74 |
| Recovery/Ag oz | 88.6% | 94.8% |
| Silver production ounces | 1,710,948 | 1,039,926 |
| Cash operating costs/oz | $9.13 | $9.98 |
| Cash cost/oz | $10.47 | $10.84 |
| Total production cost/oz | $13.37 | $13.89 |
| **Martha** |  |  |
| Tons milled | 17,818 | 17,575 |
| Ore grade/Ag oz | 12.06 | 24.59 |
| Ore grade/Au oz | 0.02 | 0.03 |
| Recovery/Ag oz | 83.7% | 84.5% |
| Recovery/Au oz | 75.3% | 88.5% |
| Silver production ounces | 179,985 | 365,226 |
| Gold production ounces | 244 | 515 |
| Cash operating costs/oz | $24.44 | $15.47 |
| Cash cost/oz | $25.46 | $15.95 |
| Total production cost/oz | $29.28 | $22.31 |
| Rochester (A) |  |  |
| Silver production ounces | 333,696 | 522,159 |
| Gold production ounces | 1,451 | 2,690 |
| Cash operating costs/oz | $10.28 | $1.68 |
| Cash cost/oz | $11.86 | $2.35 |
| Total production cost/oz | $13.53 | $3.37 |
| **Endeavor** |  |  |
| Tons milled | 167,287 | 129,872 |
| Ore grade/Ag oz | 2.00 | 3.27 |
| Recovery/Ag oz | 44.5% | 48.1% |
| Silver production ounces | 149,182 | 204,253 |
| Cash operating costs/oz | $17.15 | $7.40 |
| Cash cost/oz | $17.15 | $7.40 |
| Total production cost/oz | $21.30 | $10.63 |

32

| Gold Operation: Kensington(B) | Three months ended March 31, 2011 | 2010 |
| --- | ---: | ---: |
| Tons milled | 105,820 | — |
| Ore grade/AU oz | 0.24 | — |
| Rocovery/AU oz | 92.4% | — |
| Gold production ounces | 23,676 | — |
| Cash operating costs/oz | $988.75 | $— |
| Cash cost/oz | $988.75 | $— |
| Total production cost/oz | $1,384.30 | $— |

| CONSOLIDATED PRODUCTION TOTALS(C) | 2011 | 2010 |
| --- | ---: | ---: |
| Total silver ounces | 4,103,577 | 3,432,157 |
| Total gold ounces | 53,130 | 25,782 |
| **Silver Operations:(D)** |  |  |
| Cash operating costs per oz/silver | $8.36 | $7.41 |
| Cash cost per oz/silver | $9.10 | $7.83 |
| Total production cost/oz | $19.02 | $15.84 |
| **Gold Operation:(E)** |  |  |
| Cash operating costs/oz | $988.75 | $— |
| Cash cost/oz | $988.75 | $— |
| Total production cost/oz | $1,384.30 | $— |
| CONSOLIDATED SALES TOTALS (F) |  |  |
| Silver ounces sold | 3,659,154 | 3,633,695 |
| Gold ounces sold | 65,948 | 25,734 |
| Realized price per silver ounce | $31.27 | $16.84 |
| Realized price per gold ounce | $1,374 | $1,104 |

|  |  |
| --- | --- |
| (A) | The leach cycle at Rochester requires 5 to 10 years to recover gold and silver contained in the ore. The Company estimates the ultimate recovery to be approximately 61% for silver and 92% for gold. However, ultimate recoveries will not be known until leaching operations cease, which is currently estimated for 2014 for the current leach pad. Current recovery may vary significantly from ultimate recovery. See Critical Accounting Policies and Estimates — Ore on Leach Pad. |
| (B) | Kensington achieved commercial production on July 3, 2010. |
| (C) | Current production ounces and recoveries reflect final metal settlements of previously reported production ounces. |
| (D) | Amount includes by-product gold credits deducted in computing cash costs per ounce. |
| (E) | Amounts reflect Kensington per ounce statistics only. |
| (F) | Units sold at realized metal prices will not match reported metal sales due primarily to the effects on revenues of mark-to-market adjustments on embedded derivatives in the Company’s provisionally priced sales contracts. |
|  | “Operating Costs per Ounce” and “Cash Costs per Ounce” are calculated by dividing the operating cash costs and cash costs computed for each of the Company’s mining properties for a specified period by the amount of gold ounces or silver ounces produced by that property during that same period. Management uses cash operating costs per ounce and cash costs per ounce as key indicators of the profitability of each of its mining properties. Gold and silver are sold and priced in the world financial markets on a U.S. dollar per ounce basis. |
|  | “Cash Operating Costs” and “Cash Costs” are costs directly related to the physical activities of producing silver and gold, and include mining, processing and other plant costs, third-party refining and smelting costs, marketing expenses, on-site general and administrative costs, royalties, in-mine drilling expenditures related to production and other direct costs. Sales of by-product metals are deducted from the above in computing cash costs. Cash costs exclude depreciation, depletion and amortization, accretion, corporate general and administrative expenses, exploration, interest, and pre-feasibility costs. Cash operating costs include all cash costs except production taxes and royalties, if applicable. Cash costs are calculated and presented using the “Gold Institute Production Cost Standard” applied consistently for all periods presented. |
|  | Total operating costs and cash costs per ounce are non-U.S. GAAP measures and investors are cautioned not to place undue reliance on them and are urged to read all U.S. GAAP accounting disclosures presented in the consolidated financial statements and accompanying footnotes. In addition, see the reconciliation of “cash costs” to production costs under “Reconciliation of Non-U.S. GAAP Cash Costs to U.S. GAAP Production Costs” set forth below. |

33

The following tables present a reconciliation between non-U.S. GAAP cash operating costs per ounce and cash costs per ounce to production costs applicable to sales including depreciation, depletion and amortization, which are calculated in accordance with U.S. GAAP:

### Reconciliation of Non-U.S. GAAP Cash Costs to U.S. GAAP

### Production Costs

### March 31, 2011

*(In thousands except ounces and per*

| ounce costs) | Palmarejo | San Bartolomé | Kensington | Rochester | Martha | Endeavor | Total |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Production of silver (ounces) | 1,729,766 | 1,710,948 | — | 333,696 | 179,985 | 149,182 | 4,103,577 |
| Production of gold (ounces) |  |  | 23,676 |  |  |  | 23,676 |
| Cash operating cost per Ag ounce | $4.80 | $9.13 |  | $10.28 | $24.44 | $17.15 | $8.36 |
| Cash costs per Ag ounce | $4.80 | $10.47 |  | $11.86 | $25.46 | $17.15 | $9.10 |
| Cash operating cost per Au ounce |  |  | $988.75 |  |  |  | $988.75 |
| Cash cost per Au ounce |  |  | $988.75 |  |  |  | $988.75 |
| Total Cash Operating Cost (Non-U.S. GAAP) | $8,311 | $15,615 | $23,410 | $3,429 | $4,399 | $2,558 | $57,722 |
| Royalties | — | 2,304 | — | 330 | 183 | — | 2,817 |
| Production taxes | — | — | — | 200 | — | — | 200 |
| Total Cash Costs (Non-U.S. GAAP) | 8,311 | 17,919 | 23,410 | 3,959 | 4,582 | 2,558 | 60,739 |
| Add/Subtract: |  |  |  |  |  |  |  |
| Third party smelting costs | — | — | (2,650) | — | (1,373) | (563) | (4,586) |
| By-product credit | 38,468 | — | — | 2,015 | 339 | — | 40,822 |
| Other adjustments | 221 | (189) | — | 42 | 96 | — | 170 |
| Change in inventory | (9,631) | (3,612) | 12,160 | 1,341 | (4,034) | (895) | (4,671) |
| Depreciation, depletion and amortization | 33,666 | 5,143 | 9,365 | 514 | 591 | 619 | 49,898 |
| Production costs applicable to sales, including depreciation, depletion and amortization (U.S. GAAP) | $71,035 | $19,261 | $42,285 | $7,871 | $201 | $1,719 | $142,372 |

*(In thousands except ounces and per*

| March 31, 2010 ounce costs) | Palmarejo | San Bartolomé | Kensington | Rochester | Martha | Endeavor | Total |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Production of silver (ounces) | 1,300,593 | 1,039,926 | — | 522,159 | 365,226 | 204,253 | 3,432,157 |
| Production of gold (ounces) |  |  | — |  |  |  |  |
| Cash operating cost per Ag ounce | $5.41 | $9.98 |  | $1.68 | $15.47 | $7.40 | $7.41 |
| Cash costs per Ag ounce | $5.41 | $10.84 |  | $2.35 | $15.95 | $7.40 | $7.83 |
| Cash operating cost per Au ounce |  |  | $— |  |  |  | $— |
| Cash cost per Au ounce |  |  | $— |  |  |  | $— |
| Total Cash Operating Cost (Non-U.S. GAAP) | $7,030 | $10,379 | $— | $878 | $5,648 | $1,511 | $25,446 |
| Royalties | — | 892 |  | — | 177 | — | 1,069 |
| Production taxes | — | — |  | 348 | — | — | 348 |
| Total Cash Costs (Non-U.S. GAAP) | 7,030 | 11,271 | — | 1,226 | 5,825 | 1,511 | 26,863 |
| Add/Subtract: |  |  |  |  |  |  |  |
| Third party smelting costs | (784) | — | — | — | (693) | (264) | (1,741) |
| By-product credit | 25,045 | — | — | 2,988 | 571 | — | 28,604 |
| Other adjustments | — | — | — | 68 | 6 | — | 74 |
| Change in inventory | (3,408) | (1,868) | — | 1,507 | 1,617 | (629) | (2,781) |
| Depreciation, depletion and amortization | 20,793 | 3,177 | — | 465 | 2,317 | 660 | 27,412 |
| Production costs applicable to sales, including depreciation, depletion and amortization (U.S. GAAP) | $48,676 | $12,580 | $— | $6,254 | $9,643 | $1,278 | $78,431 |

34

### Exploration Activity

During the three months ending March 31, 2011, the Company drilled over 14,000 meters (45,900 feet) of new core on its global exploration program. The majority of this was devoted to exploration at the Company’s Palmarejo, Kensington, and Martha mine properties.

Palmarejo (Mexico)

The Company completed over 9,900 meters (32,500 feet) in 28 new core holes in the quarter to discover new silver and gold mineralization and define new ore reserves. This exploration work concentrated primarily around the Palmarejo mine from both surface and underground drill platforms with 21 new core holes; the majority of which were completed at the Tucson and Chapotillo zones in the current Palmarejo surface mine area. Many assay results were pending as of March 31, 2011, but the Company received positive results from Tucson and a new targeted area, La Virginia, immediately north of the surface mine.

San Bartolomé (Bolivia)

A new program of trenching and sampling, designed to increase ore reserves and mineral resources, commenced in the first quarter of 2011. This program is planned to test areas in the Huacajchi (southwest), Santa Rita (southeast), and Diablo (north) sectors of the mine.

Kensington (USA)

Exploration at Kensington consisted of 1,430 meters (4,691 feet) of core drilling to discover new mineralization and expand ore reserves. The main focus for this drilling was on the Raven structure, a prominent gold-bearing quartz vein, and vein splays situated about 650 meters (2,100 feet) west of the current Kensington mining area. Several high-grade intercepts were encountered in this drilling. At the end of the quarter, drilling commenced on Comet, a new quartz vein target, located south of Raven.

Rochester (USA)

Drilling at Rochester in the first quarter was entirely devoted to geotechnical projects in support of commencement of new mining. Exploration drilling is slated to commence in the second quarter.

Martha and Joaquin (Argentina)

A total of 3,167 meters (10,400 feet) of core drilling were completed on all targets in the Santa Cruz Province of southern Argentina in the first quarter of 2011. This included over 2,547 meters (8,356 feet) of drilling at the Martha mine in the first quarter of 2011 on the Martha Norte and Betty zones. The Company also conducts exploration in other parts of the Santa Cruz Province in Argentina. In the first quarter of 2011, the Company focused this effort on the Joaquin joint venture property, on which the Company recently elected to exercise its next option to acquire a 61% managing interest in the joint venture.

### Critical Accounting Policies and Estimates

**Use of Estimates:** The preparation of the Company’s consolidated financial statements in conformity with U.S. GAAP requires management to make estimates and assumptions that affect the amounts reported in their consolidated financial statements and accompanying notes. The areas requiring significant management estimates and assumptions relate to: recoverable ounces from proven and probable reserves that are the basis of future cash flow estimates and units-of-production depreciation and amortization calculations; useful lives utilized for depreciation, depletion and amortization; estimates of future cash flows for long-lived assets; estimates of recoverable gold and silver ounces in ore on leach pad; amount and timing of reclamation and remediation costs; valuation allowance for deferred tax assets; assessment of valuation allowance for value added tax receivables, and other employee benefit liabilities.

**Reclassifications:** Certain reclassifications of prior year balances have been made to conform to the current year presentation. The most significant reclassifications were to reclassify the Cerro Bayo statements of operations from historical presentation to income (loss) from discontinued operations in the consolidated statements of operations for all periods presented.

**Correction of an Immaterial Error:** In the fourth quarter of 2010, the Company identified an error in the amount of income tax benefit recognized in 2009. The Company assessed the materiality of this error in accordance with Staff Accounting Bulletin No. 108 and determined that the error was immaterial to previously reported amounts contained in its periodic reports and the Company intends to correct this error through subsequent periodic filings. See Note D — Correction of an Immaterial Error in the Company’s Form 10K for the year ended December 31, 2010.

Please see NOTE C — SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES in the Company’s latest Form 10-K for additional critical accounting policies and estimates.

### RESULTS OF OPERATIONS

### Three Months Ended March 31, 2011 Compared to Three Months Ended March 31, 2010

Sales of metal from continuing operations in the first quarter of 2011 increased by 126.1% to $199.6 million from $88.3 million in the first quarter of 2010. The increase in sales of metal was due to a 156.3% increase in the quantity of gold ounces sold, primarily from the Company’s Palmarejo silver and gold mine and the Kensington gold mine, which began commercial production on July 3, 2010. In the first quarter of 2011, the Company sold 3.7 million ounces of silver and 65,948 ounces of gold compared to 3.6 million ounces of silver and 25,734 ounces of gold for the same period in 2010. Realized silver and gold prices in the first quarter of 2011 increased 85.7% and 24.5%, respectively, over the first quarter 2010. Realized silver and gold prices were $31.27 and $1,374 per ounce, respectively, in the first quarter of 2011, compared to $16.84 and $1,104 per ounce, respectively, in the comparable quarter of 2010.

Included in sales of metals are the by-product sales derived from the sale of gold by our silver mines. Total gold sales for the periods ending March 31, 2011 and 2010 were $87.1 and $28.3 million, respectively. Of those totals, by-product metal sales were $39.0 million compared to $28.3 million, respectively. The Company believes that presentation of these metal sales as a by-product from its silver operations will continue to be appropriate in the future.

In the first quarter of 2011, the Company produced a total of 4.1 million ounces of silver and 53,130 ounces of gold, compared to 3.4 million ounces of silver and 25,782 ounces of gold in the first quarter of 2010. The increase is primarily due to higher production from Palmarejo and San Bartolomé from the same time period in 2010. The Company’s total gold production in the first quarter of 2011 increased 27,348, or 106.1%, to 53,130 ounces, as compared to 25,782 ounces in the comparable period in 2010. The increase was driven by the Kensington mine, which operated at full capacity during the first quarter of 2011.

While quarterly sales of metal rose 126.1%, production costs applicable to sales of metal in the first quarter of 2011 increased only 78.5% from $51.8 million to $92.5 million in the first quarter of 2011.

Depreciation and depletion increased by $22.3 million, from $27.7 million to $50.0 million, compared to the first quarter of 2010. The increase is due to depreciation and depletion expense from the Kensington mine, which commenced commercial production in the third quarter of 2010.

#### Costs and Expenses

Administrative and general expenses increased by $5.5 million, from $6.7 million to $12.2 million, as compared to the first quarter of 2010. The increase is due to the expensing of non-cash incentive compensation, corporate administrative, legal and other costs.

Exploration expenses increased to $2.8 million in the first quarter of 2011 compared to $2.5 million in the same period of 2010.

#### Other Income and Expenses

The Company recognized $0.5 million of losses on debt extinguishments during the first quarter of 2011 related to the payment on the Senior Term Notes due 2012 compared to a loss of $7.9 million during the first quarter of 2010, due to the exchange of a portion of the 3.25% Convertible Senior Notes due 2028 and the 1.25% Convertible Senior Notes due 2024 for shares of common stock.

Non-cash fair value adjustments, net in the three months ended March 31, 2011 were $5.3 million compared to $4.3 million in the first quarter of 2010. The majority of the increase was due to Franco-Nevada derivative adjustments realized during the quarter, offset by a decrease of foreign currency contracts and Mandalay derivatives.

Interest and other income in the first quarter of 2011 increased by $0.2 million to a gain of $1.9 million compared with the first quarter of 2010.

Interest expense, net of capitalized interest, increased to $9.3 million in the first quarter of 2011 from $5.8 million in the first quarter of 2010. The increase in interest expense was primarily due to a decrease in capitalized interest related to the Kensington mine, which was placed into service on July 3, 2010, thereby decreasing capitalized interest.

#### Income Taxes

For the three months ended March 31, 2011, the Company reported an income tax provision of approximately $12.9 million compared to an income tax benefit of $7.0 million in the first quarter of 2010. The following table summarizes the components of the Company’s income tax benefit (provision) for the three months ended March 31, 2011 and 2010 (in thousands):

| Current: | Three months ended March 31, 2011 | 2010 |
| --- | ---: | ---: |
| United States — Alternative minimum tax | $1,938 | $— |
| United States — Foreign withholding | (78) | (491) |
| Argentina | 98 | (13) |
| Australia | 101 | — |
| Mexico | (50) | (50) |
| Bolivia | (9,079) | 831 |
| Deferred: |  |  |
| United States | (616) | (5,936) |
| Australia | (519) | (290) |
| Mexico | (3,776) | 14,369 |
| Bolivia | (958) | (1,423) |
| Income tax benefit (provision) | $(12,939) | $6,997 |

37

During the three months ended March 31, 2011, the Company recognized a current provision in Bolivia primarily related to higher metal prices and inflation adjustments on non-monetary assets. Further, the Company accrued foreign withholding taxes of approximately $0.1 million on inter-company transactions between the U.S. parent and subsidiaries operating in Mexico, Argentina and Australia, and a $2.0 million benefit for anticipated operating losses in the U.S. In addition, the Company recognized a net $5.9 million deferred tax provision for the recognition of deferred taxes on deductible temporary differences, foreign exchange rate adjustments and net operating loss carryforwards in various jurisdictions (principally in Bolivia and Mexico).

During the three months ended March 31, 2010, the Company recognized a current benefit in Bolivia primarily related to inflationary adjustments on non-monetary assets. Further, the Company accrued foreign withholding taxes of approximately $0.5 million on inter-company transactions between the U.S. parent and subsidiaries operating in Mexico, Argentina and Australia. Finally, the Company recognized a net $6.7 million deferred tax benefit for the recognition of deferred taxes on deductible temporary differences, foreign exchange rate adjustments and net operating loss carryforwards in various jurisdictions (principally in Mexico).

#### Results of Discontinued Operations

In August 2010, the Company closed the sale of its interest in the Cerro Bayo mine. Pursuant to U.S. GAAP, Cerro Bayo has been reported in discontinued operations for the three month period ended March 31, 2010. There was no gain (loss) from discontinued operations for the three month period ended March 31, 2011. The loss from discontinued operations (net of taxes) for the three month period ended March 31, 2010 was $2.8 million.

The following is a summary of the Company’s discontinued operations included in the consolidated statements of operations for the three months ended March 31, 2011 and March 31, 2010 (in thousands):

|  | Three months ended March 31, 2010 |
| --- | ---: |
| Sales of metals | $— |
| Depreciation and depletion | (1,054) |
| Other operating expenses | (1,077) |
| Interest and other income | (338) |
| Income tax (expense) | (343) |
| Gain on sale of discontinued operations, net of taxes | — |
| Income (loss) from discontinued operations | $(2,812) |

#### LIQUIDITY AND CAPITAL RESOURCES

#### Working Capital; Cash and Cash Equivalents

The Company’s working capital at March 31, 2011, increased by $75.9 million to approximately $71.4 million compared to a deficit of $4.5 million at December 31, 2010. The ratio of current assets to current liabilities was 1.33 to 1 at March 31, 2011 and was 0.98 to 1 at December 31, 2010.

Net cash provided by operating activities in the three months ended March 31, 2011 was $35.8 million, compared with net cash used in operating activities of $9.2 million in the three months period ended March 31, 2010. Excluding changes in operating assets and liabilities, the Company’s operating cash flow consisted of the following:

*(In thousands)*

|  | Three months ended March 31, 2011 | 2010 |
| --- | ---: | ---: |
| CASH (USED IN) PROVIDED BY OPERATING ACTIVITIES | $35,786 | $(9,230) |
| Changes in operating assets and liabilities: |  |  |
| Receivables and other current assets | 4,860 | 11,287 |
| Inventories | 12,493 | 2,657 |
| Accounts payable and accrued liabilities | 36,663 | 23,000 |
| Operating cash flow | $89,802 | $27,714 |

Net cash used in investing activities in the first quarter of 2011 was $16.6 million, compared to $47.3 million used in investing activities in the first quarter of 2010. The decrease is primarily due to lower capital investment activity at the Kensington mine. The Company’s financing activities used $20.9 million of cash during the three months ended March 31, 2011 compared to cash provided by financing activity of $89.7 million during the three months ended March 31, 2010. The decrease is primarily due to cash payments on existing debt in the current quarter and the receipt of the proceeds from issuance of notes in the first quarter of 2010.

### Liquidity

As of March 31, 2011, the Company’s cash, equivalents and short-term investments totaled $64.4 million compared to $66.1 million as of December 31, 2010.

### Capitalized Expenditures

During the three months ended March 31, 2011, capital expenditures totaled $15.9 million, compared to $47.2 million for the first quarter of 2010.

### Gold Lease Facility

As of March 31, 2011, the Company had no gold leased from MIC. At December 31, 2010, the Company had 10,000 ounces of gold leased from MIC, which it delivered to MIC on March 22, 2011. The Company accounts for the gold lease facility as a derivative instrument, which is recorded in accrued liabilities and other in the balance sheet.

As of December 31, 2010, based on the current futures metals prices for each of the delivery dates and using a 3.1% discount rate, the fair value of the instrument was a liability of $14.1 million. The pre-credit risk adjusted fair value of the net derivative liability as of December 31, 2010 was $14.2 million. A credit risk adjustment of $0.1 million to the fair value of the derivative reduced the reported amount of the net derivative liability on the Company’s consolidated balance sheet to $14.1 million. Mark-to-market adjustments for the gold lease facility amounted to a gain of $1.4 million for the three months ended March 31, 2010. The Company recorded realized losses of $2.0 million for the three months ended March 31, 2010. The mark-to-market adjustments and realized losses are included in fair value adjustments, net.

#### Debt and Capital Resources

### 3.25% Convertible Senior Notes due 2028

As of March 31, 2011, the outstanding balance of the 3.25% Convertible Senior Notes was $48.7 million, or $43.8 million net of debt discount.

The fair value of the notes outstanding, as determined by market transactions at March 31, 2011, and December 31, 2010 was $48.5 million and $48.2 million, respectively. The carrying value of the equity component at March 31, 2011, and December 31, 2010 was $10.9 million and $10.9 million, respectively.

During the first quarters of 2011 and 2010, interest expense recognized was $0.4 million and $1.2 million, respectively, and accretion of the debt discount was $0.6 million and $1.4 million, respectively. The debt discount remaining at March 31, 2011 was $4.9 million, which will be amortized through March 15, 2013. The effective interest rate on the notes was 8.9%.

### 1.25% Convertible Senior Notes due 2024

During the first three months of 2011, the Company repurchased or redeemed all of the 1.25% Convertible Senior Notes due 2024 that were outstanding as of December 31, 2010 and, accordingly, there were no outstanding 2024 notes as of March 31, 2011. The notes were originally issued on January 13, 2004.

On January 18, 2011, the Company repurchased $945,000 in aggregate principle amount of the notes pursuant to a Tender Offer Statement filed on December 10, 2010. The Company repurchased the remaining $914,000 in aggregate principal amount of the notes outstanding on January 21, 2011.

### Senior Term Notes due December 31, 2012

As of March 31, 2011 the balance of the Senior Term Notes was $26.3 million.

For the three months ended March 31, 2011 the Company paid $3.8 million in principal and $0.5 million in interest in connection with the quarterly payments due under the notes. In addition, a loss of $0.5 million for the three months ended March 31, 2011 was realized in connection with quarterly debt payments and early payoff premiums. The loss is recorded in debt extinguishments.

### Kensington Term Facility

As of March 31, 2011 the balance of the Kensington Term Facility was $96.7 million.

Borrowings under the amended Kensington term facility bear interest at a rate equal to LIBOR plus 4.5% per year. Interest of $0.2 million was capitalized into the loan balance for the three months ended March 31, 2011.

As a condition to the amended Kensington term facility with Credit Suisse, the Company agreed to enter into a gold hedging program which protects a minimum of 187,500 ounces of gold production over the life of the facility against the risk associated with fluctuations in the market price of gold. This program consists of a series of zero cost collars which consist of a floor price and a ceiling price of gold. Collars protecting 232,500 ounces of gold were outstanding at March 31, 2011. The weighted average put feature of each collar was $940.35 and the weighted average call feature of each collar was $1,852.62. Collars protecting 182,500 ounces of gold were outstanding on December 31, 2010. The weighted average put feature on each collar was $911.99 and the weighted average call feature on each collar was $1,795.18.

### Capital Leases

During the three months ended March 31, 2011, Coeur Mexicana SA de CV (“Coeur Mexicana”), a wholly-owned subsidiary of the Company, entered into sale and leaseback transactions that have associated monthly payments to be paid until April of 2014. As of March 31, 2011, the outstanding balance on these capital leases was $27.2 million.

Other capital leases for equipment and facilities leases totaling $10.1 million were outstanding at March 31, 2011 with monthly payments through June 1, 2014.

### Other

On July 6, 2010, the Company entered into a short-term financing agreement with AFCO Credit Corporation of $2.4 million bearing interest at 2.9% to finance insurance premiums. Installments of $0.2 million are paid monthly with the final payment to be made on June 1, 2011. As of March 31, 2011, the outstanding balance was $0.4 million.

On July 15, 2009, to fund equipment purchases, Coeur Mexicana entered into an equipment financing agreement bearing interest at 8.26% with Atlas Copco. This agreement is secured by certain machinery and equipment. Twenty-four monthly installments will be made on the loans with the final payment being made on January 31, 2012. As of March 31, 2011, the outstanding balance was $0.8 million.

### Palmarejo Gold Production Royalty Obligation

The Company recognized accretion expense of $4.8 million and $5.1 million for the three months ended March 31, 2011 and 2010, respectively. As of March 31, 2011 and December 31, 2010, the remaining minimum obligation under the royalty agreement was $78.4 million and $80.3 million, respectively.

### Capitalized Interest

The Company capitalizes interest incurred on its various debt instruments as a cost of properties under development. For the three months ended March 31, 2011, and 2010 the Company capitalized interest of $0.2 million and $4.1 million, respectively. The decrease in the amount of interest capitalized was the result of the Kensington mine going into production in July of 2010.

### Litigation and Other Events

For a discussion of litigation and other events, see Note 19 to the Company’s Consolidated Financial Statements, Litigation and Other Events.

## Market risk

As filed, 10,620 characters.

### Risk Mitigation Overview

The Company is exposed to various market risks as a part of its operations. In an effort to mitigate losses associated with these risks, the Company may, at times, enter into derivative financial instruments. These may take the form of forward sales contracts, foreign currency exchange contracts and interest rate swaps. The Company does not actively engage in the practice of trading derivative instruments for profit. This discussion of the Company’s market risk assessments contains “forward looking statements” that are subject to risks and uncertainties. Actual results and actions could differ materially from those discussed below.

The Company’s operating results are substantially dependent upon the world market prices of silver and gold. The Company has no control over silver and gold prices, which can fluctuate widely and are affected by numerous factors, such as supply and demand and investor sentiment. From time to time, in order to mitigate some of the risk associated with these fluctuations, the Company may enter into forward sale contracts. The Company continually evaluates the potential benefits of engaging in these strategies based on current market conditions. The Company may be exposed to nonperformance risk by counterparties as a result of its hedging activities. This exposure would be limited to the amount that the spot price of the metal falls short of the contract price. The Company enters into contracts and other arrangements from time to time in an effort to reduce the negative effect of price changes on its cashflows. These arrangements typically consist of managing the Company’s exposure to foreign currency exchange rates and market prices associated with changes in gold and silver commodity prices. The Company may also manage price risk by purchasing put options.

### Concentrate Sales Contracts

The Company enters into concentrate sales contracts with third-party smelters. The contracts, in general, provide for a provisional payment based upon provisional assays and quoted metal prices. The provisionally priced sales contain an embedded derivative that is required to be separated from the host contract for accounting purposes. The host contract is the receivable from the sale of concentrates at the forward price at the time of sale. The embedded derivative, which is the final settlement price based on a future price, does not qualify for hedge accounting. These embedded derivatives are recorded as derivative assets (in Prepaid expenses and other) or derivative liabilities (in Accrued liabilities and other) on the balance sheet and are adjusted to fair value through earnings each period until the date of final settlement. At March 31, 2011, the Company had outstanding provisionally priced sales of $42.2 million, consisting of 107,191 ounces of silver and 28,116 ounces of gold, which had a fair value of $42.5 million including the embedded derivative. For each one cent per ounce change in realized silver price, revenue would vary (plus or minus) approximately $1,000; and for each one dollar per ounce change in realized gold price, revenue would vary (plus or minus) approximately $28,100. At December 31, 2010, the Company had outstanding provisionally priced sales of $35.7 million consisting of 647,711 ounces of silver and 12,758 ounces of gold, which had a fair value of approximately $37.4 million including the embedded derivative. For each one cent per ounce change in realized silver price, revenue would vary (plus or minus) approximately $6,000 and for each one dollar per ounce change in realized gold price, revenue would vary (plus or minus) approximately $12,800.

### Foreign Currency Contracts

The Company operates, or has mining interests, in several foreign countries, specifically Australia, Bolivia, Mexico and Argentina, which exposes the Company to risks associated with fluctuations in the exchange rates of the currencies involved. From time to time, as part of its program to manage foreign currency risk, the Company may enter into foreign currency forward exchange contracts. These contracts enable the Company to purchase a fixed amount of foreign currencies at pre-established exchange rates. Gains and losses on foreign exchange contracts that are related to firm commitments are designated and effective as hedges and are deferred and recognized in the same period as the related transaction. All other contracts that do not qualify as hedges are marked to market and the resulting gains or losses are recorded in income. The Company continually evaluates the potential benefits of entering into these contracts to mitigate foreign currency risk and proceeds when it believes that the exchange rates are most beneficial.

The Company periodically enters into forward foreign currency contracts to reduce the foreign exchange risk associated with forecasted Mexican peso (“MXP”) operating costs at its Palmarejo mine. At March 31, 2011, the Company had MXP foreign exchange contracts of $22.2 million in U.S. dollars. These contracts require the Company to exchange U.S. dollars for MXP at a weighted average exchange rate of 12.67 MXP to each U.S. dollar and had a fair value of $1.0 million at March 31, 2011. The Company recorded mark-to-market gains of $1.0 million and $0.5 million for the three months ended March 31, 2011 and 2010, respectively, which is reflected in fair value adjustments, net. The Company recorded realized gains of $0.3 million and $0.04 million in Production costs applicable to sales during the three months ended March 31, 2011 and 2010, respectively.

### Gold Lease Facility

As of March 31, 2011, the Company had no gold leased from Mitsubishi International Corporation (“MIC”). At December 31, 2010, the Company had 10,000 ounces of gold leased from MIC, which it delivered to MIC on March 22, 2011.

On December 12, 2008, the Company entered into a gold lease facility with MIC. Pursuant to this facility, the Company may lease amounts of gold from MIC and is obligated to deliver the same amounts back to MIC and to pay specified lease fees to MIC that are equivalent to interest at current market rates on the value of the gold leased. Pursuant to a Second Amended and Restated Collateral Agreement, the Company’s obligations under the facility are secured by certain collateral. The collateral agreement specifies the maximum amount of gold the Company may lease from MIC, as well as the amount and type of collateral. The Company accounts for the gold lease facility as a derivative instrument, which is recorded in accrued liabilities and other in the balance sheet.

As of December 31, 2010, based on the current futures metals prices for each of the delivery dates and using a 3.1% discount rate, the fair value of the instrument was a liability of $14.1 million. The pre-credit risk adjusted fair value of the net derivative liability as of December 31, 2010 was $14.2 million. A credit risk adjustment of $0.1 million to the fair value of the derivative reduced the reported amount of the net derivative liability on the Company’s consolidated balance sheet to $14.1 million. Mark-to-market adjustments for the gold lease facility amounted to a gain of $1.4 million for the three months ended March 31, 2010. The Company recorded realized losses of $2.0 million for the three months ended March 31, 2010. The mark-to-market adjustments and realized losses are included in fair value adjustments, net.

### Palmarejo Gold Production Royalty

On January 21, 2009, the Company entered into the gold production royalty transaction with Franco-Nevada Corporation. The minimum royalty obligation ends when payments have been made on a total of 400,000 ounces of gold. As of March 31, 2011, a total of 305,088 ounces of gold remain outstanding under the minimum royalty obligation. The price volatility associated with the minimum royalty obligation is considered an embedded derivative financial instrument under U.S. GAAP. The fair value of the embedded derivative at March 31, 2011 and December 31, 2010 was a liability of $160.9 million and $162.0 million, respectively. During the three months ended March 31, 2011, and 2010, mark-to-market adjustments for this embedded derivative amounted to a gain of $1.1 million and a loss of $1.7 million, respectively. For the three months ended March 31, 2011 and 2010, realized losses on settlement of the liabilities were $7.5 million and $3.2 million respectively. The mark-to-market adjustments and realized losses are included in fair value adjustments, net in the consolidated statement of operations.

For each $1.00 increase in the price of gold, the fair value of the net derivative liability on March 31, 2011 would have increased by approximately $0.3 million. For each $1.00 decrease in the price of gold, the fair value of the net derivative liability on March 31, 2011 would have decreased by approximately $0.3 million.

### Gold Forward Contracts

The Company purchases gold contracts to reduce the risk associated with potential decreases in the market price of gold. At December 31, 2010, the Company had one outstanding forward gold contract of 10,000 ounces at a fixed price of $1,380.00, which was settled on March 22, 2011 for a gain of $0.5 million.

### Kensington Term Facility

On March 31, 2011, in connection with the Kensington Term Facility described in Note 10, Long-Term Debt and Capital Lease Obligation, Kensington Term Facility, the Company had outstanding call options requiring it to deliver 232,500 ounces of gold at a weighted average strike price of $1,852.62 per ounce if the market price of gold exceeds the strike price. At March 31, 2011, the Company had outstanding put options allowing it to sell 232,500 ounces of gold at a weighted average strike price of $940.35 per ounce if the market price of gold were to fall below the strike price. The contracts will expire over the next five years. As of March 31, 2011, the fair market value of these contracts was a net liability of $15.4 million. During the three months ended March 31, 2011, 11,250 ounces of gold call options at a weighted average strike price of $1,723.11 per ounce expired resulting in a realized gain of $0.7 million and 11,250 ounces of gold put options at a weighted average strike price of $878.56 per ounce expired resulting in a realized loss of $0.7 million.

Additional information about the Company’s derivative financial instruments may be found in Note 15, Derivative Financial Instruments and Fair Value of Financial Instruments, to the Company’s financial statements included in Item 1.

## Controls and procedures

As filed, 1,975 characters.

### (a) Disclosure Controls and Procedures

As of the end of the period covered by this quarterly report, the Company carried out an evaluation, under the supervision and with the participation of the Company’s management, including its Chief Executive Officer and Chief Financial Officer, of the effectiveness of the design and operation of the Company’s disclosure controls and procedures (as such term is defined in Rules 13a-15(e) and 15d-15(e) of the Securities Exchange Act of 1934 (the “Exchange Act”), and management necessarily applied its judgment in assessing the costs and benefits of such controls and procedures, which by their nature, can provide only reasonable assurance regarding management’s control objectives. The design of any system of controls is based in part upon certain assumptions about the likelihood of future events. Based upon the foregoing, the Company’s Chief Executive Officer and Chief Financial Officer concluded that the Company’s disclosure controls and procedures were effective and operating to provide reasonable assurance that information required to be disclosed by it in the reports it files or submits under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in the SEC’s rules and forms, and to provide reasonable assurance that such information is accumulated and communicated to the Company’s management, including its Chief Executive Officer and Chief Financial Officer, as appropriate to allow timely decisions regarding required disclosure.

### (b) Changes in Internal Control over Financial Reporting

Based on an evaluation by the Company’s Chief Executive Officer and Chief Financial Officer, such officers concluded that there was no change in the Company’s internal control over financial reporting during the quarter ending March 31, 2011 that has materially affected, or is reasonably likely to materially affect, the Company’s internal control over financial reporting.

## Risk factors

As filed, 3,318 characters.

Item 1A (“Risk Factors”) of the Company’s Annual Report on Form 10-K for the year ended December 31, 2010 sets forth information relating to important risks and uncertainties that could materially adversely affect the Company’s business, financial condition or operating results. Those risk factors continue to be relevant to an understanding of the Company’s business, financial condition and operating results. Those risk factors have been supplemented and updated in this Form 10-Q as set forth below. References to “we,” “our” and “us” in these risk factors refer to the Company. Additional risks and uncertainties that we do not presently know or that we currently deem immaterial may also impair our business operations.

***Coeur’s operations in Bolivia are subject to political risks.***

The Bolivian government adopted a new constitution in early 2009 that strengthened state control over key economic sectors such as mining. The Company cannot assure you that its operations at the San Bartolomé mine in Bolivia will not be affected in the current political environment in Bolivia. In April 2011, media reports suggesting potential nationalization of mining interests led to clarifying statements from the Bolivian government that a recovery of mining interests does not apply to the Company’s mining rights. The government explained that any potential nationalization efforts would not impact the Company due to the fact that we have union labor support and our mining rights are already derived from the Bolivian State and the mining cooperatives who hold their rights from the Bolivian State as well. It is unknown, however, if the current or future administration may take action contrary to these assurances. It is further also unknown if any new mining or investment policies or shifts in political attitude may affect mining in Bolivia.

On October 14, 2009, the Bolivian state-owned mining organization, COMIBOL, announced by resolution that it was temporarily suspending mining activities above the elevation of 4,400 meters above sea level while stability studies of Cerro Rico mountain are undertaken. The Company holds rights to mine above this elevation under valid contracts backed by Supreme Decree with COMIBOL as well as contracts with local mining cooperatives that hold their rights through COMIBOL. The Company temporarily adjusted its mine plan to confine mining activities to the ore deposits below 4,400 meters above sea level and timely notified COMIBOL of the need to lift the restriction. In March 2010, the San Bartolomé mine began mining operations in high grade material located in the Huacajchi deposit above the 4,400 meter level under an agreement with the Cooperative Reserva Fiscal. Although restriction on mining above the 4,400 meter level continue, the Huacajchi deposit was confirmed to be excluded from the October 2009 resolution. The mine plan adjustment may reduce production until the Company is able to resume mining above 4,400 meters generally. It is uncertain at this time how long the temporary suspension will remain in place.

If the mining restriction is not lifted, the Company may need to write down the carrying value of the asset. It is also unknown if any new mining or investment policies or shifts in political attitude may affect mining in Bolivia.

Filed May 9, 2011.
Source: SEC EDGAR, the filing index for accession 0000950123-11-047199. Last ingested by Listed: Nov 14, 2026, 12:15 ET. No prices; not investment advice.
