# PG&E Corp: Form 10-Q for the period ended Sep 30, 2012

- Company: [PG&E Corp](/companies/pcg.md) (CIK 1004980)
- Form: 10-Q
- Filed: 2012-10-29
- Accepted by EDGAR: Oct 29, 2012, 19:08 ET
- Period: 2012-09-30
- Accession: 0001004980-12-000064
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/1004980/000100498012000064/form10q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/1004980/000100498012000064/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2012-09-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2012-07-01 to 2012-09-30 | $3.98bn | us-gaap:Revenues |
| Revenue | 9 months, 2012-01-01 to 2012-09-30 | $11.21bn | us-gaap:Revenues |
| Operating income | 3 months, 2012-07-01 to 2012-09-30 | $614.0m | us-gaap:OperatingIncomeLoss |
| Operating income | 9 months, 2012-01-01 to 2012-09-30 | $1.57bn | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2012-07-01 to 2012-09-30 | $178.0m | us-gaap:InterestExpense |
| Interest expense | 9 months, 2012-01-01 to 2012-09-30 | $528.0m | us-gaap:InterestExpense |
| Income tax | 3 months, 2012-07-01 to 2012-09-30 | $100.0m | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 9 months, 2012-01-01 to 2012-09-30 | $291.0m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2012-07-01 to 2012-09-30 | $364.0m | us-gaap:ProfitLoss |
| Net income | 9 months, 2012-01-01 to 2012-09-30 | $839.0m | us-gaap:ProfitLoss |
| Diluted EPS | 3 months, 2012-07-01 to 2012-09-30 | $0.84 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 9 months, 2012-01-01 to 2012-09-30 | $1.96 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2012-07-01 to 2012-09-30 | $0.84 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 9 months, 2012-01-01 to 2012-09-30 | $1.96 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2012-07-01 to 2012-09-30 | 429,000,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 9 months, 2012-01-01 to 2012-09-30 | 423,000,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 9 months, 2012-01-01 to 2012-09-30 | $3.45bn | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 9 months, 2012-01-01 to 2012-09-30 | $3.36bn | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Dividends paid | 9 months, 2012-01-01 to 2012-09-30 | $556.0m | us-gaap:PaymentsOfDividendsCommonStock |
| Cash and equivalents | at 2012-09-30 | $296.0m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2012-09-30 | $5.59bn | us-gaap:AssetsCurrent |
| Total assets | at 2012-09-30 | $50.87bn | us-gaap:Assets |
| Current liabilities | at 2012-09-30 | $5.44bn | us-gaap:LiabilitiesCurrent |
| Long-term debt | at 2012-09-30 | $12.91bn | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2012-09-30 | $0 | us-gaap:LongTermDebtCurrent |
| Short-term borrowings | at 2012-09-30 | $397.0m | us-gaap:ShortTermBorrowings |
| Shareholders' equity | at 2012-09-30 | $13.13bn | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 118,940 characters.

### RESULTS OF OPERATIONS

### OVERVIEW

PG&E Corporation, incorporated in California in 1995, is a holding company that conducts its business through Pacific Gas and Electric Company (“Utility”), a public utility operating in northern and central California. The Utility generates revenues mainly through the sale and delivery of electricity and natural gas to customers. The Utility served approximately five million electricity distribution customers and approximately four million natural gas distribution customers at September 30, 2012.

The Utility is regulated primarily by the California Public Utilities Commission (“CPUC”) and the Federal Energy Regulatory Commission (“FERC”). In addition, the Nuclear Regulatory Commission (“NRC”) oversees the licensing, construction, operation, and decommissioning of the Utility’s nuclear generation facilities. The CPUC has jurisdiction over the rates and terms and conditions of service for the Utility’s electricity and natural gas distribution operations, electric generation, and natural gas transportation and storage. The FERC has jurisdiction over the rates and terms and conditions of service governing the Utility’s electric transmission operations and over the rates and terms and conditions of service governing the Utility on its interstate natural gas transportation contracts. The Utility also is subject to the jurisdiction of other federal, state, and local governmental agencies.

Most of the Utility’s base revenues (“revenue requirements”) that the Utility is authorized to collect through rates are set by the CPUC in the General Rate Case (“GRC”), which occurs generally every three years. The Utility’s revenue requirements for other portions of its operations, such as electric transmission, natural gas transportation and storage services, electricity and natural gas purchases, are authorized in other regulatory proceedings overseen by the CPUC or the FERC. The Utility’s revenue requirements are generally set at a level to allow the Utility to recover its forecasted operating expenses, to recover depreciation, tax, and interest expenses associated with forecasted capital expenditures, and to provide the Utility with an opportunity to earn its authorized rate of return on equity (“ROE”). The Utility also collects revenue requirements to recover certain costs that the CPUC has authorized the Utility to pass through to customers, such as electricity procurement costs. From time to time, the Utility also files separate applications with the CPUC requesting authority to recover costs for other projects. PG&E Corporation’s and the Utility’s financial condition, results of operations, and cash flows are affected by the extent to which the Utility is able to timely recover its actual costs through rates and earn its authorized ROE.

This is a combined quarterly report of PG&E Corporation and the Utility and should be read in conjunction with each company’s separate Condensed Consolidated Financial Statements and the Notes to the Condensed Consolidated Financial Statements included in this quarterly report. In addition, this quarterly report should be read in conjunction with PG&E Corporation’s and the Utility’s combined Annual Report on Form 10-K for the year ended December 31, 2011 which contains or incorporates by reference each company’s audited Consolidated Financial Statements, the Notes to the Consolidated Financial Statements, and other information (“2011 Annual Report”).

### Key Factors Affecting Results of Operations and Financial Condition

During 2012, PG&E Corporation’s and the Utility’s financial condition, results of operations, and cash flows have continued to be materially affected by costs the Utility has incurred to improve the safety and reliability of its natural gas operations, as well as by costs related to the ongoing regulatory proceedings, investigations, and civil lawsuits that commenced following the rupture of one of the Utility’s natural gas transmission pipelines in San Bruno, California on September 9, 2010 (the “San Bruno accident”). The outcome of these matters and a number of other factors have had, and will continue to have, a material impact on PG&E Corporation’s and the Utility’s future results of operations, financial condition, and cash flows.

- *The Outcome of Matters Related to the Utility’s Natural Gas System.* The Utility forecasts that total unrecoverable pipeline-related expenses could be as much as $550 million in 2012, including $371 million incurred during the nine months ended September 30, 2012 to validate pipeline operating pressures, conduct strength tests, and perform other work within the scope of the Utility’s proposed pipeline safety enhancement plan, as well as legal and regulatory costs. (See “Operating and Maintenance” below.) On October 12, 2012, a proposed decision was issued that, if adopted by the CPUC, would disallow rate recovery for a significant portion of plan-related expenses and capital expenditures requested in the Utility’s proposed plan. (See “CPUC Gas Safety Rulemaking Proceeding” below.) PG&E Corporation and the Utility also continue to believe that the CPUC will impose penalties on the Utility of at least $200 million in connection with the CPUC’s investigations and enforcement matters and that the ultimate amount of penalties could be materially higher. (See Note 10 to the Condensed Consolidated Financial Statements and “Natural Gas Matters” below.) PG&E Corporation and the Utility also believe it is reasonably possible that they may incur additional charges of up to $145 million for third-party claims related to the San Bruno accident. An ongoing investigation of the San Bruno accident by federal, state, and local authorities also may result in the imposition of civil or criminal penalties on the Utility. PG&E Corporation’s and the Utility’s future financial condition, results of operations, and cash flows may also be affected by additional civil or criminal penalties, or punitive damages, if any, that the Utility may be required to pay.
- *Authorized Rate of Return, Capital Structure, and Financing.* PG&E Corporation contributes equity to the Utility as needed by the Utility to maintain its CPUC-authorized capital structure for its electric and natural gas distribution and electric generation rate base, consisting of 52% common equity and 48% debt and preferred stock. The Utility has incurred significant costs that are not recoverable through rates, which has increased the Utility’s equity financing needs. For the nine months ended September 30, 2012, the Utility received equity contributions from PG&E Corporation of approximately $715 million, which were funded primarily through common stock issuances. The Utility’s future equity financing needs will be affected by the ultimate amount of unrecoverable costs and penalties incurred in connection with natural gas matters discussed above. Additional equity issued by PG&E Corporation in the future could have a material dilutive effect on PG&E Corporation’s earnings per common share. In addition, the Utility’s net income and PG&E Corporation’s income available for common shareholders in 2013 and future years may be affected by changes in the Utility’s authorized capital structure and ROE, currently set at 11.35%, including any reductions that may be made to ROE for authorized capital expenditures incurred under the Utility’s pipeline safety enhancement plan. (See “2013 Cost of Capital Proceeding” and “CPUC Gas Safety Rulemaking Proceeding” below.) The Utility’s financing needs also will be affected by other factors, including the expiration of the accelerated (or “bonus”) depreciation provisions of the federal Tax Relief Act in 2013, and the timing and amount of the Utility’s capital expenditures, operating expenses, and collateral requirements associated with price risk management activities. PG&E Corporation’s and the Utility’s ability to access the capital markets and the terms and rates of future financings could be affected by changes in their respective credit ratings, the outcome of natural gas matters, general economic and market conditions, and other factors. (See “Liquidity and Financial Resources” below.)
- *The Timing and Outcome of Ratemaking and Other Regulatory Proceedings.* The Utility’s financial results are affected by the timing and outcome of rate case decisions and other proceedings. As described in the 2011 Annual Report, the CPUC issued decisions in 2011 that determined the majority of the Utility’s base revenue requirements through 2013 or later. The Utility intends to file its 2014 GRC application with the CPUC before the end of 2012. In the 2014 GRC, the CPUC will determine the amount of revenue requirements the Utility can collect through rates for its electric generation operations and electric and natural gas distribution from 2014 through 2016. (See “2014 General Rate Case” below.) On September 28, 2012, the Utility filed its Transmission Owner (“TO”) rate case application with the FERC requesting an increase of $254 million in electric transmission rates over the estimated revenues that the Utility would receive in 2013 based on present rates. (See “TO Rate Case” below.) Further, as noted above, the Utility’s future financial results will be affected by the timing and outcome of the CPUC’s final decision regarding the Utility’s proposed pipeline safety enhancement plan and the outcome of the pending investigations related to natural gas matters. (See “Natural Gas Matters – CPUC Gas Safety Rulemaking Proceeding” below.) In addition, the CPUC is expected to issue a decision by December 31, 2012 on the Utility’s application to change its capital structure and rates of return on each component beginning on January 1, 2013. The outcome of these regulatory proceedings can be affected by many factors, including general economic conditions, the level of customer rates, regulatory policies, and political considerations.
- *The Ability of the Utility to Control Operating Costs.* In addition to the expenses related to the Utility’s proposed pipeline safety enhancement plan and the other natural gas matters described above, the Utility incurred expenses in the nine months ended September 30, 2012 that are $176 million higher than amounts authorized in the 2011 rate cases to improve the safety and reliability of its electric and natural gas operations. The Utility forecasts that these incremental expenses, which are not recoverable through rates, will total approximately $250 million in 2012. The Utility expects that it will continue to incur these incremental and non-recoverable costs in 2013 as the Utility continues to work to improve the safety and reliability of its operations. (See “Results of Operations” below.) The Utility plans to request that the CPUC authorize increased revenue requirements in the 2014 GRC and the 2015 Gas Transmission and Storage (“GT&S”) rate case to allow the Utility to recover the higher level of expenses it anticipates it will incur. In addition, any future increase in the Utility’s environmental-related liabilities that are not recoverable through rates, such as costs associated with its natural gas compressor station located in Hinkley, California, also will negatively affect PG&E Corporation’s and the Utility’s future financial condition, results of operations, and cash flows. (See “Environmental Matters” below.) Other differences between the amount or timing of the Utility’s actual costs and forecasted or authorized amounts may also affect the Utility’s ability to earn its authorized ROE and negatively affect the amount of PG&E Corporation’s future income available for common shareholders.

### Summary of Changes in Earnings per Common Share and Income Available for Common Shareholders for the Three and Nine Months Ended September 30, 2012

The following table is a summary reconciliation of the key changes in PG&E Corporation’s income available for common shareholders and earnings per common share for the three and nine months ended September 30, 2012:

*(in millions, except per share amounts)*

|  | Three Months Ended September 30, Earnings | Earnings Per Common Share (Diluted) | Nine Months Ended September 30, Earnings | Earnings Per Common Share (Diluted) |
| --- | ---: | ---: | ---: | ---: |
| **Income Available for Common Shareholders – September 30, 2011** | **$200** | **$0.50** | **$761** | **$1.90** |
| Increase in rate base earnings | 20 | 0.05 | 62 | 0.14 |
| Litigation and regulatory matters | 10 | 0.02 | 34 | 0.08 |
| Storm and outage expenses | - | - | 34 | 0.08 |
| Environmental-related costs | 60 | 0.15 | 18 | 0.06 |
| Gas transmission revenues | - | - | 14 | 0.03 |
| Natural gas matters | 138 | 0.34 | 8 | 0.05 |
| Planned incremental work | (42) | (0.10) | (104) | (0.24) |
| Increase in shares outstanding (1) | - | (0.06) | - | (0.14) |
| Other | (25) | (0.06) | 2 | - |
| **Income Available for Common Shareholders – September 30, 2012** | **$361** | **$0.84** | **$829** | **$1.96** |

(1) Represents the impact of a higher number of shares outstanding at September 30, 2012, compared to the number of shares outstanding at September 30, 2011. PG&E Corporation issues shares to fund its equity contributions to the Utility that are used by the Utility to maintain its capital structure and fund operations, including expenses related to natural gas matters. This has no dollar impact on earnings.

### CAUTIONARY LANGUAGE REGARDING FORWARD-LOOKING STATEMENTS

This report contains forward-looking statements that are necessarily subject to various risks and uncertainties. These statements reflect management’s judgment and opinions which are based on current estimates, expectations, and projections about future events and assumptions regarding these events and management’s knowledge of facts as of the date of this report. These forward-looking statements relate to, among other matters, estimated capital expenditures; estimated environmental remediation, tax, and other liabilities; estimates and assumptions used in PG&E Corporation’s and the Utility’s critical accounting policies; estimated losses associated with various investigations, enforcement matters, and regulatory proceedings pertaining to the San Bruno accident and the Utility’s natural gas operations; estimated losses and insurance recoveries associated with the civil litigation arising from the San Bruno accident; estimated additional costs the Utility will incur related to its natural gas and electric operations; estimated future cash flows; and the amount of future equity or debt financings. These statements are also identified by words such as “assume,” “expect,” “intend,” “forecast,” “plan,” “project,” “believe,” “estimate,” “target,” “predict,” “anticipate,” “aim,” “may,” “might,” “should,” “would,” “could,” “goal,” “potential,” and similar expressions. PG&E Corporation and the Utility are not able to predict all the factors that may affect future results. Some of the factors that could cause future results to differ materially from those expressed or implied by the forward-looking statements, or from historical results, include, but are not limited to:

- the timing and terms of the resolution of pending investigations and enforcement matters related to the Utility’s natural gas system operating practices and the San Bruno accident, including the ultimate amount of penalties the Utility will be required to pay, and whether the resolution is reached through settlement negotiations, or a fully litigated proceeding; the ultimate amount of third-party claims associated with the San Bruno accident and the timing and amount of related insurance recoveries; the ultimate amount of punitive damages, if any, the Utility may incur related to third-party claims; and the ultimate amount of civil or criminal penalties, if any, the Utility may incur related to the criminal investigation;
- the outcomes of regulatory proceedings, such as the CPUC’s natural gas rulemaking proceeding, and the outcome of ratemaking proceedings, such as the 2014 GRC and the 2013 cost of capital proceeding;
- the ultimate amount of costs the Utility incurs in the future that are not recovered through rates, including costs incurred under its pipeline safety enhancement plan, and additional costs incurred to perform incremental work to improve the safety and reliability of its electric and natural gas operations;
- the outcome of future investigations or proceedings that may be commenced by the CPUC or other regulatory authorities relating to the Utility’s compliance with laws, rules, regulations, or orders applicable to the operation, inspection, and maintenance of its electric and gas facilities (in addition to investigations or proceedings related to the San Bruno accident and natural gas matters);
- whether PG&E Corporation and the Utility are able to repair the reputational harm that they have suffered, and may suffer in the future, due to the San Bruno accident and the related civil litigation, the occurrence of adverse developments in the CPUC investigations or the criminal investigation, including any finding of criminal liability;
- the level of equity contributions that PG&E Corporation must make to the Utility to enable the Utility to maintain its authorized capital structure as the Utility incurs charges and costs, including costs associated with natural gas matters and penalties imposed in connection with the pending investigations, that are not recoverable through rates or insurance;
- the impact of environmental remediation laws, regulations, and orders; the ultimate amount of costs incurred to discharge the Utility’s known and unknown remediation obligations; the extent to which the Utility is able to recover compliance and remediation costs from third parties or through rates or insurance; and the ultimate amount of costs the Utility incurs in connection with environmental remediation liabilities that are not recoverable through rates or insurance, such as the remediation costs associated with the Utility’s natural gas compressor station site located near Hinkley, California;
- the results of seismic studies the Utility is conducting that could affect the Utility’s ability to continue operating its Diablo Canyon nuclear power plant (“Diablo Canyon”) or renew the operating licenses for Diablo Canyon, and the impact of new legislation, regulations, recommendations or policies applicable to the operations, security, safety, or decommissioning of nuclear facilities, the storage of spent nuclear fuel, seismic design, cooling water intake, or other issues;
- the impact of weather-related conditions or events (such as storms, tornadoes, floods, drought, solar or electromagnetic events, and wildland and other fires), natural disasters (such as earthquakes, tsunamis, and pandemics), and other events (such as explosions, fires, accidents, mechanical breakdowns, equipment failures, human errors, and labor disruptions), as well as acts of terrorism, war, or vandalism, including cyber-attacks, that can cause unplanned outages, reduce generating output, disrupt the Utility’s service to customers, or damage or disrupt the facilities, operations, or information technology and systems owned by the Utility, its customers, or third parties on which the Utility relies; and subject the Utility to third-party liability for property damage or personal injury, or result in the imposition of civil, criminal, or regulatory penalties on the Utility;
- the impact of environmental laws and regulations aimed at the reduction of carbon dioxide and other greenhouse gases (“GHG”s), and whether the Utility is able to recover associated compliance costs, including the cost of emission allowances and offsets, that the Utility may incur under cap-and-trade regulations;
- changes in customer demand for electricity (“load”) and natural gas resulting from unanticipated population growth or decline in the Utility’s service area, general and regional economic and financial market conditions, the extent of municipalization of the Utility’s electric distribution facilities, changing levels of “direct access” customers who procure electricity from alternative energy providers, changing levels of customers who purchase electricity from governmental bodies that act as “community choice aggregators,” and the development of alternative energy technologies including self-generation and distributed generation technologies;
- the adequacy and price of electricity, natural gas, and nuclear fuel supplies; the extent to which the Utility can manage and respond to the volatility of energy commodity prices; the ability of the Utility and its counterparties to post or return collateral in connection with price risk management activities; and whether the Utility is able to recover timely its energy commodity costs through rates;
- whether the Utility’s information technology, operating systems and networks, including the newly installed advanced metering system infrastructure, customer billing, financial, and other systems, continue to function accurately; whether the Utility can modify its operating systems and networks as needed to timely implement “dynamic pricing” retail electric rates and comply with other requirements established by the CPUC; whether the Utility is able to protect its operating systems and networks from damage, disruption, or failure caused by cyber-attacks, computer viruses, or other hazards; whether the Utility’s security measures are sufficient to protect confidential customer, vendor, and financial data contained in such systems and networks from unauthorized access and disclosure; and whether the Utility can continue to rely on third-party vendors and contractors that maintain and support some of the Utility’s operating systems;
- the extent to which costs incurred in connection with third-party claims or litigation are not recoverable through insurance, rates, or from other third parties;
- the ability of PG&E Corporation and the Utility to access capital markets and other sources of debt and equity financing in a timely manner on acceptable terms;
- the impact of federal or state laws or regulations, or their interpretation, on energy policy and the regulation of utilities and their holding companies, including how the CPUC interprets and enforces the financial and other conditions imposed on PG&E Corporation when it became the Utility’s holding company, and whether the outcome of proceedings and investigations relating to the Utility’s natural gas operations affects the Utility’s ability to make distributions to PG&E Corporation in the form of dividends or share repurchases; and
- the outcome of federal or state tax audits and the impact of any changes in federal or state tax laws, policies, or regulations.

For more information about the significant risks that could affect the outcome of these forward-looking statements and PG&E Corporation’s and the Utility’s future financial condition, results of operations, and cash flows, see the discussion in the section entitled “Risk Factors” in the 2011 Annual Report and Item 1A. Risk Factors, below. PG&E Corporation and the Utility do not undertake an obligation to update forward-looking statements, whether in response to new information, future events, or otherwise.

### RESULTS OF OPERATIONS

The table below details certain items from the accompanying Condensed Consolidated Statements of Income for the three and nine months ended September 30, 2012 and 2011:

*(in millions)*

| Utility | Three Months Ended September 30, 2012 | 2011 | Nine Months Ended September 30, 2012 | 2011 |
| --- | ---: | ---: | ---: | ---: |
| Electric operating revenues | $3,321 | $3,187 | $9,022 | $8,691 |
| Natural gas operating revenues | 653 | 672 | 2,184 | 2,447 |
| Total operating revenues | 3,974 | 3,859 | 11,206 | 11,138 |
| Cost of electricity | 1,283 | 1,224 | 3,104 | 3,018 |
| Cost of natural gas | 118 | 170 | 593 | 936 |
| Operating and maintenance | 1,343 | 1,497 | 4,134 | 3,951 |
| Depreciation, amortization, and decommissioning | 617 | 566 | 1,807 | 1,648 |
| Total operating expenses | 3,361 | 3,457 | 9,638 | 9,553 |
| Operating Income | 613 | 402 | 1,568 | 1,585 |
| Interest income | 2 | 2 | 5 | 6 |
| Interest expense | (172) | (171) | (511) | (511) |
| Other income, net | 19 | 19 | 64 | 52 |
| Income before income taxes | 462 | 252 | 1,126 | 1,132 |
| Income tax provision | 122 | 56 | 328 | 376 |
| **Net Income** | **340** | **196** | **798** | **756** |
| Preferred stock dividend requirement | 3 | 3 | 10 | 10 |
| **Income Available for Common Stock** | **$337** | **$193** | **$788** | **$746** |
| **PG&E Corporation, Eliminations, and Other(1)** |  |  |  |  |
| Operating revenues | $2 | $1 | $4 | $3 |
| Operating expenses (income) | 1 | (5) | 4 | 4 |
| Operating Income (Loss) | 1 | 6 | - | (1) |
| Interest income | - | - | 1 | 1 |
| Interest expense | (6) | (5) | (17) | (16) |
| Other income (expense), net | 7 | (1) | 20 | 4 |
| Income (loss) before income taxes | 2 | - | 4 | (12) |
| Income tax benefit | (22) | (7) | (37) | (27) |
| **Net Income** | **$24** | **$7** | **$41** | **$15** |
| **Consolidated Total** |  |  |  |  |
| Operating revenues | $3,976 | $3,860 | $11,210 | $11,141 |
| Operating expenses | 3,362 | 3,452 | 9,642 | 9,557 |
| Operating Income | 614 | 408 | 1,568 | 1,584 |
| Interest income | 2 | 2 | 6 | 7 |
| Interest expense | (178) | (176) | (528) | (527) |
| Other income, net | 26 | 18 | 84 | 56 |
| Income Before Income Taxes | 464 | 252 | 1,130 | 1,120 |
| Income tax provision | 100 | 49 | 291 | 349 |
| **Net Income** | **364** | **203** | **839** | **771** |
| Preferred stock dividend requirement of subsidiary | 3 | 3 | 10 | 10 |
| **Income Available for Common Shareholders** | **$361** | **$200** | **$829** | **$761** |

(1) PG&E Corporation eliminates all intercompany transactions in consolidation.

The following presents the Utility’s operating results for the three and nine months ended September 30, 2012 and 2011.

### Electric Operating Revenues

The Utility’s electric operating revenues consist of amounts charged to customers for electricity generation, transmission and distribution services, as well as amounts charged to customers to recover electricity procurement costs and the costs of public purpose, energy efficiency, and demand response programs.

The following table provides a summary of the Utility’s total electric operating revenues:

*(in millions)*

|  | Three Months Ended September 30, 2012 | 2011 | Nine Months Ended September 30, 2012 | 2011 |
| --- | ---: | ---: | ---: | ---: |
| Revenues excluding pass-through costs | $1,616 | $1,573 | $4,763 | $4,595 |
| Revenues for recovery of passed-through costs | 1,705 | 1,614 | 4,259 | 4,096 |
| **Total electric operating revenues** | **$3,321** | **$3,187** | **$9,022** | **$8,691** |

The Utility’s total electric operating revenues, including revenues intended to recover costs that are passed through to customers, increased by $134 million, or 4%, in the three months ended September 30, 2012 and by $331 million, or 4%, in the nine months ended September 30, 2012, as compared to the same periods in 2011. Revenues intended to recover costs that are passed through to customers and do not impact net income increased by $91 million and $163 million in the three and nine months ended September 30, 2012, respectively, as compared to the same periods in 2011, primarily due to an increase in cost of electricity. (See “Cost of Electricity” below.)

Electric operating revenues, excluding revenues intended to recover costs that are passed through to customers, increased by $43 million and $168 million in the three and nine months ended September 30, 2012, respectively, as compared to the same periods in 2011. The increase for both periods is primarily due to an increase in base revenues as authorized in the 2011 GRC decision.

The Utility’s future electric operating revenues, excluding revenues intended to recover costs that are passed through to customers, are expected to increase during the remainder of 2012 and in 2013 as authorized by the CPUC in the 2011 GRC. Additionally, the Utility’s future electric operating revenues are also expected to increase as authorized by the FERC in the TO rate case. These future electric operating revenues will be impacted by the cost of electricity and other revenues intended to recover costs that are passed through to customers.

### Cost of Electricity

The Utility’s cost of electricity includes the costs of power purchased from third parties, transmission, fuel used in its own generation facilities, fuel supplied to other facilities under power purchase agreements, and realized gains and losses on price risk management activities. (See Note 7 of the Notes to the Condensed Consolidated Financial Statements.) The Utility’s cost of electricity is passed through to customers. The Utility’s cost of electricity excludes non-fuel costs associated with operating the Utility’s own generation facilities and electric transmission system, which are included in operating and maintenance expense in the Condensed Consolidated Statements of Income.

The following table provides a summary of the Utility’s cost of electricity and the total volume and average cost of purchased power:

*(in millions)*

|  | Three Months Ended September 30, 2012 | 2011 | Nine Months Ended September 30, 2012 | 2011 |
| --- | ---: | ---: | ---: | ---: |
| Cost of purchased power | $1,214 | 1,141 | $2,896 | $2,819 |
| Fuel used in own generation facilities | 69 | 83 | 208 | 199 |
| **Total cost of electricity** | **$1,283** | **$1,224** | **$3,104** | **$3,018** |
| Average cost of purchased power per kWh (1) | $0.088 | 0.092 | $0.079 | 0.089 |
| Total purchased power (in millions of kWh) | 13,720 | 12,446 | 36,539 | 31,582 |

(1) Kilowatt-hour

The Utility’s total cost of electricity increased by $59 million, or 5%, in the three months ended September 30, 2012 and by $86 million, or 3%, in the nine months ended September 30, 2012, as compared to the same periods in 2011, primarily due to an increase in the volume of purchased power, which was partially offset by the decrease in the average cost of purchased power. The volume of power the Utility purchases is driven by load, the availability of the Utility’s own generation facilities, and the cost effectiveness of each source of electricity.

Various factors will affect the Utility’s future cost of electricity, including the market prices for electricity and natural gas, the availability of Utility-owned generation, and changes in load. Additionally, the cost of electricity is expected to be impacted by the higher cost of procuring renewable energy as the Utility increases the amount of its renewable energy deliveries to comply with current and future California law and regulatory requirements. The Utility’s future cost of electricity also will be affected by legislation and rules applicable to GHG emissions. (See “Environmental Matters” below.)

### Natural Gas Operating Revenues

The Utility’s natural gas operating revenues consist of amounts charged for transportation, distribution, and storage services, as well as amounts charged to customers to recover the cost of natural gas procurement and public purpose program expenses.

The following table provides a summary of the Utility’s natural gas operating revenues:

*(in millions)*

|  | Three Months Ended September 30, 2012 | 2011 | Nine Months Ended September 30, 2012 | 2011 |
| --- | ---: | ---: | ---: | ---: |
| Revenues excluding pass-through costs | $433 | $422 | $1,320 | $1,275 |
| Revenues for recovery of passed-through costs | 220 | 250 | 864 | 1,172 |
| **Total natural gas operating revenues** | **$653** | **672** | **$2,184** | **$2,447** |

The Utility’s natural gas operating revenues, including revenues intended to recover costs that are passed through to customers, decreased by $19 million, or 3%, and by $263 million, or 11%, in the three and nine months ended September 30, 2012, respectively, as compared to the same periods in 2011. Revenues intended to recover costs that are passed through to customers and do not impact net income decreased by $30 million and $308 million in the three and nine months ended September 30, 2012, respectively, as compared to the same periods in 2011, primarily due to a decrease in the cost of natural gas.

Natural gas operating revenues, excluding revenues intended to recover costs that are passed through to customers, increased by $11 million and by $45 million in the three and nine months ended September 30, 2012, respectively, as compared to the same periods in 2011. The increase for both periods is primarily due to an increase in base revenues as authorized in the 2011 GT&S rate case and GRC decisions and increases in natural gas storage revenues.

The Utility’s operating revenues for natural gas transmission and storage services in 2013 and 2014 will reflect revenue increases that have been authorized by the CPUC in the 2011 GT&S rate case decision. The Utility’s revenues for natural gas distribution services in 2013 (excluding revenues intended to recover passed-through costs) will also reflect revenue increases authorized by the CPUC in the 2011 GRC decision. Additionally, the Utility’s future operating revenues will reflect those revenues authorized by the CPUC under the Utility’s proposed pipeline safety enhancement plan. (See “Natural Gas Matters” below.) The Utility’s future gas operating revenues also will be impacted by changes in the cost of natural gas, natural gas throughput volume, and other factors.

### Cost of Natural Gas

The Utility’s cost of natural gas includes the costs of procurement, storage, transportation of natural gas and realized gains and losses on price risk management activities. (See Note 7 of the Notes to the Condensed Consolidated Financial Statements.) The Utility’s cost of natural gas is passed through to customers. The cost of natural gas excludes the cost of transportation on the Utility’s pipeline system, which is included in operating and maintenance expense in the Condensed Consolidated Statements of Income.

The following table provides a summary of the Utility’s cost of natural gas:

*(in millions)*

|  | Three Months Ended September 30, 2012 | 2011 | Nine Months Ended September 30, 2012 | 2011 |
| --- | ---: | ---: | ---: | ---: |
| Cost of natural gas sold | $75 | $128 | $454 | $802 |
| Transportation cost of natural gas sold | 43 | 42 | 139 | 134 |
| **Total cost of natural gas** | **$118** | **$170** | **$593** | **$936** |
| Average cost per Mcf of natural gas sold | $2.42 | $3.88 | $2.52 | $4.20 |
| Total natural gas sold (in millions of Mcf) (1) | 31 | 33 | 180 | 191 |

(1) One thousand cubic feet.

The Utility’s total cost of natural gas decreased by $52 million, or 31%, and by $343 million, or 37%, in the three and nine months ended September 30, 2012, respectively, as compared to the same periods in 2011. These decreases were primarily due to a lower average market price of natural gas during 2012.

The Utility’s future cost of natural gas will be affected by the market price of natural gas and changes in customer demand. In addition, the Utility’s future cost of natural gas may be affected by federal or state legislation or rules to regulate the GHG emissions from the Utility’s natural gas transportation and distribution facilities and from natural gas consumed by the Utility’s customers.

### Operating and Maintenance

Operating and maintenance expenses consist mainly of the Utility’s costs to operate and maintain its electricity and natural gas facilities, customer billing and service expenses, the cost of public purpose programs, and administrative and general expenses. The Utility’s ability to earn its authorized rate of return depends in part on the success of its ability to manage its expenses and to achieve operational and cost efficiencies.

The Utility’s operating and maintenance expenses decreased by $154 million, or 10%, from $1,497 million in the three months ended September 30, 2011 to $1,343 million in the three months ended September 30, 2012. The total decrease in operating and maintenance expense was primarily due to a $233 million decrease in net costs associated with natural gas matters (see table below) and a $76 million decrease in environmental remediation costs associated with the Hinkley natural gas compressor site, which were partially offset by approximately $40 million of increased labor and benefit-related costs, and costs to improve the safety and reliability of the Utility’s electric and natural gas operations that were $72 million higher than amounts assumed under the 2011 rate cases.

The Utility’s operating and maintenance expenses increased by $183 million, or 5%, from $3,951 million in the nine months ended September 30, 2011 to $4,134 million in the nine months ended September 30, 2012. The total increase in operating and maintenance expense was primarily due to costs incurred to improve the safety and reliability of electric and natural gas operations that were $176 million higher than amounts assumed under the 2011 rate cases and approximately $80 million of increased labor and benefit-related costs, which were partially offset by a $58 million decrease in storm-related costs, a $24 million decrease in environmental remediation costs associated with the Hinkley natural gas compressor site, and a $12 million decrease in net costs associated with natural gas matters (see table below).

The following table provides a summary of the Utility’s costs associated with natural gas matters, principally included in operating and maintenance expenses:

*(in millions)*

|  | Three Months Ended September 30, 2012 | 2011 | Nine Months Ended September 30, 2012 | 2011 |
| --- | ---: | ---: | ---: | ---: |
| Pipeline-related costs | $139 | $177 | $371 | $303 |
| Third-party liability | - | 96 | 80 | 155 |
| Insurance recoveries | (99) | - | (135) | (60) |
| Contributions | - | - | 70 | - |
| **Total natural gas matters** | **$40** | **$273** | **$386** | **$398** |

47

The Utility incurred net costs of $40 million and $386 million during the three and nine months ended September 30, 2012, respectively, in connection with natural gas matters. These amounts included pipeline-related costs to validate safe operating pressures, conduct strength testing, and perform other activities associated with safety improvements to the Utility’s natural gas pipeline system, as well as legal and regulatory costs. Costs incurred for the nine months ended September 30, 2012 also included an increase in the accrual for third-party claims related to the San Bruno accident and a contribution to the City of San Bruno. These costs were partially offset by insurance recoveries related to third-party claims. There were no additional charges incurred during these periods related to penalties. (See “Natural Gas Matters” below.)

Future operating and maintenance expense will continue to be affected by costs associated with natural gas matters that are not recoverable through rates, including pipeline-related expenses incurred under the pipeline safety enhancement plan that are not authorized for recovery by the CPUC, any additional charges for third-party claims arising from the San Bruno accident that are not recoverable through insurance, additional charges for civil or criminal penalties, or punitive damages, if any, that may be imposed on the Utility, and ongoing legal and regulatory expenses related to these matters. (See “Natural Gas Matters” below.) The Utility also anticipates that it will incur additional costs in future periods as it undertakes a multi-year effort to clear some of its gas transmission pipeline easements of encroachments caused by vegetation overgrowth and building structures that could impede the Utility’s access to pipelines. The additional costs incurred to clear encroachments may not be recoverable through rates.

Following the Utility’s detection of mercury, a hazardous substance, in some gas transmission pipeline segments that have undergone hydrostatic pressure testing, the Utility has begun to assess the need for further remedial action to address the possible presence of mercury in other pipeline segments. The Utility is currently assessing the scope of the matter and the extent to which the Utility’s future operating and maintenance costs may be affected is uncertain.

The Utility also forecasts that it will incur expenses in 2012 that are approximately $250 million higher than amounts assumed under the 2011 rate case decisions (including $176 million incurred during the nine months ended September 30, 2012, as described above) as the Utility works to improve the safety and reliability of its electric and natural gas operations. The Utility expects to continue to incur these incremental expenses in 2013.

### Depreciation, Amortization, and Decommissioning

The Utility’s depreciation and amortization expense consists of depreciation and amortization of plant and regulatory assets, and decommissioning expenses associated with fossil fuel-fired generation facilities and nuclear power facilities. The Utility’s depreciation, amortization, and decommissioning expenses increased by $51 million, or 9%, and by $159 million, or 10%, in the three and nine months ended September 30, 2012, respectively, as compared to the same periods in 2011. The increase in the three and nine months ended September 30, 2012 is primarily due to capital additions.

The Utility’s depreciation expense for future periods is expected to be impacted as a result of capital additions and the implementation of new depreciation rates as authorized by the CPUC in future GRC and GT&S rate cases, and by the FERC TO rate cases.

### Interest Income, Interest Expense and Other Income, Net

There were no material changes to interest income, interest expense and other income, net for the three and nine months ended September 30, 2012, as compared to the same periods in 2011.

### Income Tax Provision

The Utility’s income tax provision increased by $66 million, or 118%, in the three months ended September 30, 2012, as compared to the same period in 2011. The effective tax rates for the three months ended September 30, 2012 and 2011 were 26% and 22%, respectively. The effective tax rates increased in the three months ended September 30, 2012, as compared to the same period in 2011, mainly due to lower tax-deductible costs, including decommissioning and software development costs.

The Utility’s income tax provision decreased by $48 million, or 13%, in the nine months ended September 30, 2012, as compared to the same period in 2011. The effective tax rates for the nine months ended September 30, 2012 and 2011 were 29% and 33%, respectively. The effective tax rates decreased in the nine months ended September 30, 2012, as compared to the same period in 2011, mainly due to receiving a benefit associated with a tax settlement for prior year tax returns, a higher tax deduction resulting from an accounting method change for repairs as compared to the same periods in 2011, and non-tax-deductible penalties recorded in 2011, with no comparable amount in 2012.

### LIQUIDITY AND FINANCIAL RESOURCES

### Overview

The Utility’s ability to fund operations, make distributions to PG&E Corporation and preferred stockholders, and pay off maturing debt depends on the levels of its operating cash flows and access to the capital and credit markets. The levels of the Utility’s operating cash and short-term debt fluctuate as a result of seasonal load, volatility in energy commodity costs, collateral requirements related to price risk management activities, the timing and amount of tax payments or refunds, and the timing and effect of regulatory decisions and financings, among other factors. The Utility generally utilizes equity contributions from PG&E Corporation and long-term senior unsecured debt issuances to maintain its CPUC-authorized capital structure and to fund its capital expenditures. The Utility relies on short-term debt, including commercial paper and draws under its revolving credit facility, to fund temporary financing needs. The CPUC authorizes the aggregate amount of long-term debt and short-term debt that the Utility may issue and authorizes the Utility to recover its related debt financing costs. The Utility has short-term borrowing authority of $4.0 billion, including $500 million that is restricted to certain contingencies.

PG&E Corporation’s ability to fund operations, make scheduled principal and interest payments, fund Utility equity contributions as needed for the Utility to maintain its CPUC-authorized capital structure, fund tax equity investments, and pay dividends primarily depends on the level of cash distributions received from the Utility and PG&E Corporation’s access to the capital and credit markets.

### Revolving Credit Facilities

The following table summarizes PG&E Corporation’s and the Utility’s outstanding borrowings under their revolving credit facilities and the Utility’s commercial paper program at September 30, 2012:

*(in millions)*

| Termination Date | Facility Limit |  | Letters of Credit Outstanding | Borrowings | Commercial Paper |  | Facility Availability |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| PG&E Corporation May 2016 | $300 | (1) | $- | $- | $- |  | $300 |  |
| Utility May 2016 | 3,000 | (2) | 330 | - | 145 | (3) | 2,525 | (3) |
| **Total revolving credit facilities** | **$3,300** |  | **$330** | **$-** | **$145** |  | **$2,825** |  |

(1) Includes a $100 million sublimit for letters of credit and a $100 million commitment for loans that are made available on a same-day basis and are repayable in full within 7 days.

(2) Includes a $1.0 billion sublimit for letters of credit and a $300 million commitment for loans that are made available on a same-day basis and are repayable in full within 7 days.

(3) The Utility treats the amount of its outstanding commercial paper as a reduction to the amount available under its revolving credit facility.

For the nine months ended September 30, 2012, there were no borrowings under PG&E Corporation’s and the Utility’s revolving credit facilities. For the nine months ended September 30, 2012, the average outstanding commercial paper balance was $879 million and the maximum outstanding balance during the period was $1.4 billion.

The revolving credit facilities include usual and customary covenants for revolving credit facilities of this type, including covenants limiting liens to those permitted under PG&E Corporation’s and the Utility’s senior note indentures, mergers, sales of all or substantially all of PG&E Corporation’s and the Utility’s assets, and other fundamental changes. In addition, the revolving credit facilities require that PG&E Corporation and the Utility maintain a ratio of total consolidated debt to total consolidated capitalization of at most 65% as of the end of each fiscal quarter. The $300 million revolving credit facility agreement also requires that PG&E Corporation own, directly or indirectly, at least 80% of the common stock and at least 70% of the voting capital stock of the Utility. At September 30, 2012, PG&E Corporation and the Utility were in compliance with all covenants under their respective revolving credit facilities.

### 2012 Financings

### Utility

On April 2, 2012, the Utility repurchased the entire $50 million principal amount of pollution control bonds Series 2010 E that were subject to mandatory tender on that same date. The Utility will hold the bonds until they are remarketed to investors or retired.

On April 16, 2012, the Utility issued $400 million principal amount of 4.45% Senior Notes due April 15, 2042. The proceeds from the issuance were used to repay a portion of outstanding commercial paper and for general corporate purposes.

On August 16, 2012, the Utility issued $400 million principal amount of 2.45% Senior Notes due August 15, 2022 and $350 million principal amount of 3.75% Senior Notes due August 15, 2042. The proceeds were used to repay a portion of outstanding commercial paper and for general corporate purposes.

During the nine months ended September 30, 2012, the Utility received equity contributions of $715 million from PG&E Corporation to maintain the 52% equity component of the Utility’s CPUC-authorized capital structure.

During the nine months ended September 30, 2012, PG&E Corporation sold 5,446,760 shares of its common stock under the Equity Distribution Agreement executed in November 2011 for cash proceeds of $234 million, net of fees and commissions of $2 million. At September 30, 2012, PG&E Corporation had the ability to issue an additional $64 million of its common stock under the Equity Distribution Agreement. On March 20, 2012, PG&E Corporation sold 5,900,000 shares of its common stock in an underwritten public offering for cash proceeds of $254 million, net of fees and commissions. In addition, during the nine months ended September 30, 2012, PG&E Corporation issued 5,446,542 shares of its common stock under its 401(k) plan, its Dividend Reinvestment and Stock Purchase Plan, and its share-based compensation plans for total cash proceeds of $214 million. PG&E Corporation used the cash proceeds for general corporate purposes and to contribute equity to the Utility.

### Future Financing and Liquidity Needs

The amount and timing of the Utility’s future financing and liquidity needs will depend on various factors, including:

- the amount of cash generated through normal business operations;
- the timing and amount of capital expenditures;
- the timing and amount of payments, including punitive damages, if any, made to third parties in connection with the San Bruno accident, and the timing and amount of related insurance recoveries (see “Natural Gas Matters –Third Party Claims” below);
- the timing and amount of penalties imposed on the Utility in connection with the investigations and enforcement matters pending against the Utility related to the San Bruno accident and the Utility’s natural gas pipeline system (see “Natural Gas Matters − Pending CPUC Investigations and Enforcement Matters” below);
- the timing and amount of costs associated with the Utility’s natural gas pipeline system, and the amount that is not recoverable through rates (see “Operating and Maintenance” above and “Natural Gas Matters” below);
- the timing of the resolution of the Chapter 11 disputed claims and the amount of interest on these claims that the Utility will be required to pay (see Note 9 of the Notes to the Condensed Consolidated Financial Statements);
- the amount of future tax payments; and
- the conditions in the capital and credit markets, and other factors.

As the Utility incurs charges that are not recoverable through customer rates, the Utility’s equity financing needs will increase. PG&E Corporation contributes equity to the Utility as needed to maintain the Utility’s CPUC-authorized capital structure. PG&E Corporation’s equity contributions to the Utility are funded primarily through common stock issuances. PG&E Corporation also may use draws under its revolving credit facility to occasionally fund equity contributions on an interim basis. Additional common stock issued by PG&E Corporation in the future to fund further equity contributions to the Utility could have a material dilutive effect on PG&E Corporation’s earnings per common share.

A change in the Utility’s authorized capital structure also may impact PG&E Corporation’s and the Utility’s future debt and equity financing needs. On April 20, 2012, the Utility filed an application to begin the cost of capital proceeding in which the CPUC will determine the Utility’s authorized capital structure and rates of return beginning on January 1, 2013. (See “2013 Cost of Capital Proceeding” in “Regulatory Matters” below.)

### Dividends

On September 18, 2012, the Board of Directors of PG&E Corporation declared a dividend of $0.455 per share, totaling $195 million, of which $190 million was paid on October 15, 2012 to shareholders of record on October 1, 2012. The remaining $5 million was reinvested under the Dividend Reinvestment and Stock Purchase Plan.

On September 18, 2012, the Board of Directors of the Utility declared dividends on its outstanding series of preferred stock, payable on November 15, 2012, to shareholders of record on October 31, 2012.

### Utility

### Operating Activities

The Utility’s cash flows from operating activities primarily consist of receipts from customers less payments of operating expenses, other than expenses such as depreciation that do not require the use of cash.

The Utility’s cash flows from operating activities for the nine months ended September 30, 2012 and 2011 were as follows:

*(in millions)*

|  | Nine Months Ended September 30, 2012 | 2011 |
| --- | ---: | ---: |
| Net income | $798 | $756 |
| Adjustments to reconcile net income to net cash provided by operating activities: |  |  |
| Depreciation, amortization, and decommissioning | 1,807 | 1,648 |
| Allowance for equity funds used during construction | (79) | (64) |
| Deferred income taxes and tax credits, net | 633 | 564 |
| Other | 189 | 193 |
| Effect of changes in operating assets and liabilities: |  |  |
| Accounts receivable | (327) | (125) |
| Inventories | (34) | (60) |
| Accounts payable | (31) | 97 |
| Income taxes receivable/payable | 153 | (156) |
| Other current assets and liabilities | 15 | (153) |
| Regulatory assets, liabilities, and balancing accounts, net | 66 | 70 |
| Other noncurrent assets and liabilities | 315 | 491 |
| **Net cash provided by operating activities** | **$3,505** | **$3,261** |

In the nine months ended September 30, 2012, net cash provided by operating activities increased by $244 million compared to the same period in 2011 primarily due to fluctuations in activities within the normal course of business such as the timing and amount of customer billings and collections.

Future cash flow from operating activities will be affected by the timing and amount of payments, including punitive damages, if any, that may be awarded, to third parties in connection with the San Bruno accident, any related insurance recoveries, any civil or criminal penalties that may be imposed on the Utility, higher operating and maintenance costs associated with the Utility’s natural gas and electric operations, and future tax payments, among other factors. (See “Operating and Maintenance” above and “Natural Gas Matters” below.)

### Investing Activities

The Utility’s investing activities primarily consist of construction of new and replacement facilities necessary to deliver safe and reliable electricity and natural gas services to its customers. The amount and timing of the Utility’s capital expenditures is affected by many factors, including the timing of regulatory approvals and the occurrence of storms and other events causing outages or damages to the Utility’s infrastructure. Cash used in investing activities also includes the proceeds from sales of nuclear decommissioning trust investments which are largely offset by the amount of cash used to purchase new nuclear decommissioning trust investments. The funds in the decommissioning trusts, along with accumulated earnings, are used exclusively for decommissioning and dismantling the Utility’s nuclear facilities.

The Utility’s cash flows from investing activities for the nine months ended September 30, 2012 and 2011 were as follows:

*(in millions)*

|  | Nine Months Ended September 30, 2012 | 2011 |
| --- | ---: | ---: |
| Capital expenditures | $(3,361) | $(2,968) |
| (Increase) decrease in restricted cash | (38) | 170 |
| Proceeds from sales and maturities of nuclear decommissioning trust investments | 903 | 1,574 |
| Purchases of nuclear decommissioning trust investments | (964) | (1,604) |
| Other | 14 | 13 |
| **Net cash used in investing activities** | **$(3,446)** | **$(2,815)** |

Net cash used in investing activities increased by $631 million in the nine months ended September 30, 2012 compared to the same period in 2011. This increase was partially due to an increase of $393 million in capital expenditures in the nine months ended September 30, 2012. In addition, in the nine months ended September 30, 2011, there was a decrease of $170 million in restricted cash that primarily reflected $191 million in releases from escrow for settled or withdrawn Chapter 11 disputed claims, with no comparable activity in 2012.

Future cash flows used in investing activities are largely dependent on the timing and amount of capital expenditures. (See “Capital Expenditures” below for further discussion of expected spending and significant capital projects.)

### Financing Activities

The Utility’s cash flows from financing activities for the nine months ended September 30, 2012 and 2011 were as follows:

*(in millions)*

|  | Nine Months Ended September 30, 2012 | 2011 |
| --- | ---: | ---: |
| Borrowings under revolving credit facilities | $- | $208 |
| Repayments under revolving credit facilities | - | (208) |
| Net (repayments) issuances of commercial paper, net of discount of $3 in 2012 and $2 in 2011 | (1,247) | 196 |
| Proceeds from issuance of long-term debt, net of discount and issuance costs of $10 in 2012 and $6 in 2011 | 1,140 | 544 |
| Long-term debt matured | (50) | (700) |
| Energy recovery bonds matured | (313) | (299) |
| Preferred stock dividends paid | (10) | (10) |
| Common stock dividends paid | (537) | (537) |
| Equity contribution | 715 | 350 |
| Other | 25 | 12 |
| **Net cash used in financing activities** | **$(277)** | **$(444)** |

In the nine months ended September 30, 2012, net cash used in financing activities decreased by $167 million compared to the same period in 2011. Cash provided by or used in financing activities is driven by the level of cash provided by or used in operating and investing activities. The Utility generally utilizes equity contributions from PG&E Corporation and long-term senior unsecured debt issuances to maintain its CPUC-authorized capital structure and to fund its capital expenditures, and relies on short-term debt to fund temporary financing needs.

### CONTRACTUAL COMMITMENTS

PG&E Corporation and the Utility enter into contractual commitments in connection with future obligations that relate to financing arrangements (such as long-term debt, preferred stock, and certain forms of regulatory financing), purchases of electricity and natural gas for customers, purchases of transportation capacity, purchases of renewable energy, and purchases of fuel and transportation to support the Utility’s generation activities. (Refer to the 2011 Annual Report, the “Liquidity and Financial Resources” section above, and Notes 4 and 10 of the Notes to the Condensed Consolidated Financial Statements.)

### CAPITAL EXPENDITURES

The Utility makes capital investments in its electric generation and electric and natural gas transmission and distribution infrastructure to maintain and improve system reliability, safety, and customer service; to extend the life of or replace existing infrastructure; and to add new infrastructure to meet growth. Most of the Utility’s revenue requirements to recover forecasted capital expenditures are authorized in the GRC, TO, and GT&S rate cases. The Utility collects additional revenue requirements to recover capital expenditures related to projects that have been specifically authorized by the CPUC in separate proceedings, such as for new power plants, the SmartMeterTM advanced metering infrastructure, or other initiatives.

### Oakley Generation Facility

In March 2012, the California Court of Appeal granted The Utility Reform Network’s (“TURN”) appeal of the CPUC’s decision in December 2010 that had approved the Utility’s purchase of a 586-megawatt natural gas-fired facility in Oakley, California (“Oakley Generation Facility”). The Court determined that the CPUC had not allowed TURN, or other parties, sufficient opportunity to protest the Oakley Generation Facility, conduct discovery, or present evidence concerning the Utility’s purchase and sale agreement. The facility is fully permitted and construction began in June 2011. On March 30, 2012, in response to the Court’s ruling, the Utility filed a new application with the CPUC requesting approval of the Oakley Generation Facility and an amended and restated purchase and sale agreement between the Utility and Contra Costa Generating Station LLC. The Utility expects that the CPUC will issue a proposed decision on the application in late 2012.

### Natural Gas Pipeline Safety Enhancement Plan

See “Natural Gas Matters – CPUC Gas Safety Rulemaking Proceeding” below.

### NATURAL GAS MATTERS

PG&E Corporation’s and the Utility’s financial condition, results of operations, and cash flows, have continued to be negatively affected by costs incurred to improve the safety and reliability of the Utility’s natural gas operations and to respond to the regulatory proceedings, investigations, and civil lawsuits related to the San Bruno accident and the Utility’s natural gas operations. The current status of these matters and new developments are described below.

### Pending CPUC Investigations and Enforcement Matters

The CPUC is conducting three investigations of the Utility’s natural gas operations that relate to (1) the Utility’s safety recordkeeping for its natural gas transmission system (the “Records OII”), (2) the Utility’s operation of its natural gas transmission pipeline system in or near locations of higher population density (the “Class Location OII”), and (3) the Utility’s pipeline installation, integrity management, recordkeeping and other operational practices, and other events or courses of conduct, that could have led to or contributed to the San Bruno accident (the “San Bruno OII”). During 2012, the CPSD issued investigative reports in each of these investigations alleging that the Utility committed numerous violations of applicable laws and regulations and recommending the CPUC impose penalties on the Utility. See “Penalties Conclusion” below. The CPUC began hearings on each of the investigations. (See Note 10 of the Notes to the Condensed Consolidated Financial Statements.) The CPUC will also consider testimony submitted by the CPSD in September 2012 that consisted of a financial analysis report prepared by a consultant engaged by the CPSD to examine PG&E Corporation’s financial health and to provide an estimate of its ability to raise equity capital sufficient to fund a CPUC-imposed penalty on the Utility. The consultant concluded that PG&E Corporation could raise approximately $2.25 billion in addition to equity PG&E Corporation had already forecasted it would issue in 2012 to fund CPUC-imposed penalties on the Utility.

On October 11, 2012, the procedural schedule for evidentiary hearings and briefings in the three investigations as well as the submittal of the Utility’s response on the financial resources issue was suspended until November 1, 2012 to enable the Utility, the CPSD, and other parties to continue to engage in negotiations to reach a stipulated outcome of these proceedings. Any settlement agreement that may be reached would be required to be submitted to the CPUC for its consideration. The CPUC would hold hearings before issuing a final decision. PG&E Corporation and the Utility are uncertain whether the parties will reach a settlement agreement and, if a settlement agreement is reached, whether the CPUC would approve it. See “Penalties Conclusion” below.

#### Other Natural Gas Compliance Matters

California gas corporations are required to provide notice to the CPUC of any self-identified or self-corrected violations of certain state and federal regulations related to the safety of natural gas facilities and utilities’ natural gas operating practices. The CPSD has been delegated authority from the CPUC to enforce compliance with these regulations. As of September 30, 2012, the Utility has submitted 29 self-reports with the CPUC, plus additional follow-up reports. In a self-report filed on October 19, 2012, the Utility reported that it does not have documentation substantiating that approximately 4.5 miles of pipe had undergone integrity assessments prior to December 17, 2007, as required by federal regulations. In April 2012, the CPUC affirmed a $17 million penalty that had been imposed by the CPSD based on the Utility’s self-report that it failed to conduct periodic leak surveys because it had not included 16 gas distribution maps in its leak survey schedule. (The Utility has completed all of the missed leak surveys.) The CPSD has not yet taken action with respect to the Utility’s other self-reports. The CPSD may issue additional citations and impose penalties on the Utility associated with these or future reports that the Utility may file. (See “Penalties Conclusion” below.)

In July 2012, the Utility reported to the CPUC that it had discovered that its access to some pipelines has been limited by vegetation overgrowth or building structures that encroach upon some of the Utility’s gas pipeline property easements and that the Utility plans to undertake a multi-year effort to clear these encroachments. (Also see “Operating and Maintenance” above.) PG&E Corporation and the Utility are uncertain how this matter will affect the investigative proceedings related to natural gas operations, or whether additional proceedings or investigations will be commenced by the CPUC.

#### Penalties Conclusion

The CPUC can impose significant penalties for violations of applicable laws, rules, and orders in connection with the pending investigations and enforcement matters described above. The CPUC and the CPSD have wide discretion to determine the number of violations and the length of time the violations existed. The calculation of penalties is generally based on the totality of the circumstances, including such factors as the severity of the violations; the type of harm caused by the violations and the number of persons affected; conduct taken to prevent, detect, disclose or rectify the violations; and the financial resources of the regulated entity.

PG&E Corporation and the Utility continue to believe it is probable that the Utility will incur total penalties of at least $200 million in connection with these investigations and other enforcement matters. PG&E Corporation and the Utility have not recorded any additional charges during the nine months ended September 30, 2012 and are unable to estimate the reasonably possible amount of penalties in excess of the amount accrued, and such amounts could be material. These estimates, and the assumptions on which they are based, are subject to change based on many factors, including developments that may occur during the settlement negotiations, the terms of any proposed settlement agreement that may be reached, whether and when the CPUC approves the proposed settlement agreement, and rulings and decisions by the CPUC and the administrative law judges presiding over these proceedings. Future changes in these estimates or assumptions could have a material impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, and cash flows.

### CPUC Gas Safety Rulemaking Proceeding

The CPUC is conducting a rulemaking proceeding to adopt new safety and reliability regulations for natural gas transmission and distribution pipelines in California and the related ratemaking mechanisms. The CPUC is considering proposed implementation plans that were filed by the Utility and other California natural gas pipeline operators. As directed by the CPUC, the Utility also submitted proposed ratemaking mechanisms to allocate plan costs between ratepayers and shareholders. Several parties, including the CPUC’s Division of Ratepayer Advocates (“DRA”) and TURN, opposed various aspects of the Utility’s proposals.

#### Pipeline Safety Enhancement Plan

On October 12, 2012, the CPUC administrative law judge (“ALJ”) overseeing the proceeding issued a proposed decision regarding the Utility’s proposed pipeline safety enhancement plan, cost forecasts, and ratemaking mechanisms. The Utility’s proposed plan consists of two major programs, a pipeline modernization program (including valve automation) and a pipeline records integration program. The Utility has proposed to carry out the plan in two phases; the first phase began on January 1, 2011 and the second phase will begin on January 1, 2015. In its application, the Utility forecasted that its total plan-related costs over the first phase would be approximately $2.2 billion, including $1.4 billion in capital expenditures and $750 million in expenses. The Utility requested that the CPUC approve the scope and timing of projects proposed in the plan and authorize the Utility to recover its forecasted capital expenditures. The Utility proposed that most plan-related expenses incurred from 2012 through 2014 be recovered through rates but did not seek recovery of expenses for 2011 (forecasted to be $221 million).

In general, the ALJ recommended approval of the Utility’s plan, but proposed to limit recovery of expenses to $167 million (plus two months of expenses in 2012 assuming an effective date of November 1, 2012) and to limit recovery of capital expenditures to $1.0 billion. Assuming a final decision is not issued until after December 31, 2012, the Utility would be unable to recover 2011 and 2012 expenses. Under the proposed decision, the Utility would be unable to recover any costs in excess of the adopted capital and expense amounts and the adopted amounts would be reduced by the cost of any plan project not completed and not replaced with a higher priority project. In addition, the ALJ recommended that the Utility’s ROE for plan-related capital investments through 2014 be reduced to the cost of debt (currently 6.05%) for the first five years the investments are in service, which the Utility currently estimates would reduce net income over the relevant period by approximately $130 million. See “2013 Cost of Capital Proceeding” below.

The following table compares the Utility’s requested expense and capital amounts with the ALJ’s recommended amounts and shows the total estimated reduction in equity earnings over the relevant period based on the ALJ’s ROE recommendation:

*(in millions)*

| Expense | 2011 |  | 2012 |  | 2013 | 2014 | Total |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Requested | $221 |  | $231 |  | $155 | $144 | $751 |
| ALJ’s recommendation | - | (1) | - | (2) | 74 | 93 | 167 |
| Difference | $221 |  | $231 |  | $81 | $51 | $584 |
| **Capital** |  |  |  |  |  |  |  |
| Requested | $69 |  | $384 |  | $480 | $500 | $1,433 |
| ALJ’s recommendation | 47 |  | 265 |  | 353 | 367 | 1,032 |
| Difference | $22 |  | $119 |  | $127 | $133 | $401 |
| **ROE (3)** |  |  |  |  |  |  | $130 |

(1) The Utility’s August 2011 application did not request recovery of forecast 2011 plan-related expenses of $221 million.

(2) The ALJ assumed a November 1, 2012 effective date, but the table above assumes a delayed effective date resulting in no recovery of 2012 expenses.

(3) Estimated total after-tax reduction in equity earnings based on ALJ’s recommended rate of ROE and recommended lower capital amounts over the relevant period, as compared to the 11% rate requested in the Utility’s pending cost of capital proceeding.

The ALJ stated that if the proposed decision is adopted by the CPUC, the ratemaking recovery authorized in the rulemaking decision would be subject to refund, noting the possibility that further ratemaking adjustments may be made in the pending CPUC investigations in which the CPUC will address potential penalties to be imposed on the Utility. (See “Pending CPUC Investigations and Enforcement Matters” above.) Comments on the proposed decision are due on November 13, 2012; reply comments are due on November 26, 2012.

The Utility forecasts that total unrecoverable pipeline-related expenses for 2012 could be as much as $550 million, including $371 million incurred in the nine months ended September 30, 2012 to validate safe pipeline operating pressures and conduct strength testing, as well as legal and other expenses related to natural gas matters. At September 30, 2012, PG&E Corporation and the Utility had capitalized approximately $187 million of plan-related expenditures in their Condensed Consolidated Balance Sheets. If the proposed decision is adopted by the CPUC, disallowed capital investments will be charged to net income in the period in which the CPUC orders such a disallowance. Future disallowed expense and capital costs would be charged to net income in the period incurred.

The ultimate amount of pipeline-related costs that the Utility will be allowed to recover from customers will be affected by various factors, including the terms of the CPUC’s final decision on the Utility’s plan, the outcome of the CPUC’s pending investigations discussed above, including the terms of a potential settlement, if any, that may be reached in the pending CPUC investigations. PG&E Corporation’s and the Utility’s financial results also will be impacted by additional costs the Utility will incur to address any other pipeline matters identified by the Utility or to comply with new regulatory or legislative requirements.

#### Gas Safety Plan

On June 29, 2012, the Utility filed its proposed gas safety plan with the CPUC to comply with recently enacted California law (“Senate Bill 705”) that requires each California gas corporation to implement industry best practices for both natural gas transmission and distribution. In the plan, the Utility outlined the safety programs the Utility has in place, those that are being implemented, and future projects and initiatives to increase the safety and reliability of the Utility’s gas system, including the extensive work proposed in the Utility’s pipeline safety enhancement plan. The plan includes a proposed timeline for implementing the proposed projects and initiatives that corresponds to future rate case proceedings, such as the 2014 GRC and the 2015 GT&S rate case. (See “2014 General Rate Case” below.) The CPUC is required to accept, modify, or reject the gas safety plan by the end of 2012.

The CPUC also ordered that CPSD-managed management and financial audits of each gas corporation be conducted to address safety-related corporate culture and historical spending. The financial audits will examine the gas corporations’ authorized and budgeted safety-related capital investments and operation and maintenance expenditures for their last two authorized GRC cycles. (The CPUC stated that the Utility’s natural gas transmission-related expenditures will be excluded from the financial audit since its transmission-related expenditures were already the subject of an audit.) The ALJ has not yet issued an order to establish the scope and timing of the management and financial audits and the Utility is uncertain when the audits will be completed and what action the CPUC may take in response to the results of the audits.

### Criminal Investigation

The U.S. Department of Justice, the California Attorney General’s Office, and the San Mateo County District Attorney’s Office are conducting an investigation of the San Bruno accident and have indicated that the Utility is a target of the investigation. The Utility is cooperating with the investigation. PG&E Corporation and the Utility are uncertain whether any criminal charges will be brought against either company or any of their current or former employees. PG&E Corporation and the Utility are unable to estimate the amount (or range of amounts) of reasonably possible losses associated with any civil or criminal penalties that could be imposed on the Utility.

### Third-Party Claims

In addition to the investigations and proceedings discussed above, at September 30, 2012, approximately 130 lawsuits involving third-party claims for personal injury and property damage, including two class action lawsuits, had been filed against PG&E Corporation and the Utility in connection with the San Bruno accident on behalf of approximately 420 plaintiffs. The lawsuits seek compensation for personal injury and property damage, and other relief, including punitive damages. These cases have been coordinated and assigned to one judge in the San Mateo County Superior Court. As of October 26, 2012, approximately 70 plaintiffs have settled their claims. The trial date for the first group of the remaining plaintiffs is currently scheduled for January 2, 2013. PG&E Corporation and the Utility have filed a motion to dismiss the remaining plaintiffs’ claims for punitive damages based upon a lack of evidence to support such claims. The court has set a hearing date for October 29, 2012 to consider the motion.

At September 30, 2012, the Utility has recorded a cumulative charge of $455 million for estimated third-party claims related to the San Bruno accident, including an $80 million charge made during the second quarter of 2012, primarily to reflect settlements and information exchanged by the parties during the settlement and discovery process. The Utility estimates it is reasonably possible that it may incur as much as an additional $145 million for third-party claims, for a total possible loss of $600 million. PG&E Corporation and the Utility are unable to estimate the amount (or range of amounts) of reasonably possible losses associated with punitive damages, if any, related to these matters. The Utility has publicly stated that it is liable for the San Bruno accident and will take financial responsibility to compensate all of the victims for the injuries they suffered as a result of the accident. (See Note 10 to the Condensed Consolidated Financial Statements.)

The Utility has liability insurance from various insurers who provide coverage at different policy limits that are triggered in sequential order or “layers.” Generally, as the policy limit for a layer is exhausted, the next layer of insurance becomes available. The aggregate amount of this insurance coverage is approximately $992 million in excess of a $10 million deductible. At September 30, 2012, the Utility has recognized cumulative insurance recoveries of $234 million, including $99 million and $135 million during the three and nine months ended September 30, 2012. Although the Utility believes that a significant portion of costs incurred for third-party claims related to the San Bruno accident will ultimately be recovered through its insurance, it is unable to predict the amount and timing of future insurance recoveries. (See Note 10 to the Condensed Consolidated Financial Statements.)

### Class Action Complaint

On August 23, 2012, a complaint was filed in the San Francisco Superior Court against PG&E Corporation and the Utility (and other unnamed defendants) by individuals who seek certification of a class consisting of all California residents who were customers of the Utility between 1997 and 2010, with certain exceptions. The plaintiffs allege that the Utility collected more than $100 million in customer rates from 1997 through 2010 for the purpose of various safety measures and operations projects but instead used the funds for general corporate purposes such as executive compensation and bonuses. To state their claims, the plaintiffs cited the CPSD’s January 2012 investigative report that alleged, from 1996 to 2010, the Utility spent less on capital expenditures and operations and maintenance expense for its natural gas transmission operations than it recovered in rates, by $95 million and $39 million, respectively. The CPSD recommended that the Utility should use such amounts to fund future gas transmission expenditures and operations. (See 2011 Annual Report.) Plaintiffs allege that PG&E Corporation and the Utility engaged in unfair business practices in violation of Section 17200 of the California Business and Professions Code (“Section 17200”) and claim that this violation also constitutes a violation of California Public Utilities Code Section 2106 (“Section 2106”), which provides a private right of action for violations of the California constitution or state laws by public utilities. Plaintiffs seek restitution and disgorgement under Section 17200 and compensatory and punitive damages under Section 2106.

PG&E Corporation and the Utility contest the plaintiffs’ allegations. On October 9, 2012, PG&E Corporation and the Utility requested the court to dismiss the complaint on the grounds that the CPUC has exclusive jurisdiction to adjudicate the issues raised by the plaintiffs’ allegations. In the alternative, PG&E Corporation and the Utility have requested that the court order the plaintiffs to delay proceeding on the complaint until the CPUC investigations described above are concluded. The court has set a hearing for December 17, 2012. Due to the early stage of this proceeding, PG&E Corporation and the Utility are unable to estimate the amount (or range of amounts) of reasonably possible losses that may be incurred in connection with this matter.

### Other Pending Lawsuits and Claims

A purported shareholder derivative lawsuit was filed following the San Bruno accident to seek recovery on behalf of PG&E Corporation and the Utility for alleged breaches of fiduciary duty by officers and directors, among other claims. On May 26, 2011, the judge ordered that proceedings in the derivative lawsuit be delayed until further order of the court.

In February 2011, the Board authorized PG&E Corporation to reject a shareholder demand that the Board (1) institute an independent investigation of the San Bruno accident and related alleged safety issues; (2) seek recovery of all costs associated with such issues through legal proceedings against those determined to be responsible, including Board members, officers, other employees, and third parties; and (3) adopt corporate governance initiatives and safety programs. The Board also reserved the right to commence further investigation or litigation regarding the San Bruno accident if the Board deems such investigation or litigation appropriate.

### REGULATORY MATTERS

The Utility is subject to substantial regulation by the CPUC, the FERC, the NRC and other federal and state regulatory agencies. The resolutions of these and other proceedings may affect PG&E Corporation’s and the Utility’s results of operations and financial condition. Significant regulatory developments that have occurred since the 2011 Annual Report was filed with the Securities and Exchange Commission (“SEC”) are discussed below.

### 2014 General Rate Case

In the Utility’s 2014 GRC, the CPUC will determine the annual amount of authorized revenue requirements that the Utility is authorized to collect from customers beginning January 1, 2014 through 2016 to recover its anticipated costs for electric and natural gas distribution and electric generation operations and to provide the Utility an opportunity to earn its authorized rate of return. During the GRC period, the Utility plans to make additional capital investments in electric and natural gas distribution and electric generation infrastructure, and improve safety, reliability and customer service.

Under the process established by the CPUC for general rate cases, the Utility is required to submit a draft of its GRC application to the DRA for review. On July 2, 2012, the Utility submitted its draft application to the DRA, which included the Utility’s calculations supporting the amount of its proposed increase in revenue requirements for the GRC period. On September 14, 2012, the DRA notified the Utility that it had completed its review and that the Utility was authorized to file its formal application with the CPUC after the expiration of a 60-day waiting period. The Utility anticipates that it will file its formal application with the CPUC, including revised calculations supporting the final amount of its requested revenue requirement increase, before the end of 2012.

Independent consultants hired by the CPUC’s CPSD are expected to review certain operational plans underlying the Utility’s 2014 cost forecast to ensure that safety and security concerns have been addressed and that the plans properly incorporate risk assessments and mitigation measures. The consultants are expected to evaluate the Utility’s plans, provide information about the quality and cost-effectiveness of the Utility’s safety and security proposals, and compare the proposals to industry best practices and standards. The Utility will be able to respond to the consultants' reviews later in the proceeding, and the Utility’s response may include a revised revenue requirement forecast to address specific recommendations made by the consultants.

Other parties, including the DRA and TURN, will have an opportunity to file comments on the Utility’s application. Following the submission of comments and public hearings, the assigned CPUC ALJ would issue a proposed decision for consideration by the CPUC. The Utility intends to request that the CPUC issue a final decision by December 31, 2013.

### Electric Transmission Owner Rate Case

On September 28, 2012, the Utility filed an application with the FERC requesting an increase in retail and wholesale electric transmission rates charged to customers to recover the Utility’s costs to provide electric transmission services. The Utility’s present rates have been in effect since March 1, 2011. The Utility has requested the FERC to authorize an estimated 2013 annual revenue requirement of $1.2 billion, an increase of $254 million over the estimated revenues that the Utility would receive in 2013 based on present rates. This includes a requested return on equity of 11.5%.

The most significant factors driving the requested increase are the Utility’s continuing needs to replace and modernize aging infrastructure; to interconnect new electric generation, including renewable resources; and to accommodate the magnitude and location of forecasted electric load growth in California. The Utility forecasts that it will make investments of $783 million in 2012 and an additional $837 million in 2013 in various capital projects, including projects to add transmission capacity, expand automation technology, improve overall system reliability, and maintain and replace equipment at substations. The proposed rate base in 2013 is forecast to be $4.5 billion compared to $3.6 billion in 2011. The operations and maintenance costs associated with this request are forecast to be approximately $191 million, compared to $152 million in 2011.

The Utility requested that the new rates become effective on December 1, 2012. In accordance with past practice, the Utility expects that the FERC will issue an order accepting the requested increase and allowing the proposed rate changes to become effective on May 1, 2013, subject to refund following the FERC’s issuance of a final decision on the application.

### 2013 Cost of Capital Proceeding

On April 20, 2012, the Utility filed an application with the CPUC to request that the CPUC authorize the Utility’s capital structure and the rates of return on each capital structure component, for the Utility’s electric generation, electric and natural gas distribution, and natural gas transmission and storage rate base beginning on January 1, 2013. (The FERC has jurisdiction over the rates of return for the Utility’s electric transmission rate base.) The following table compares the currently authorized capital structure and rates of return that will remain in effect through 2012 with those requested in the Utility’s application:

|  | Currently Authorized Cost | Capital Structure | Weighted Cost | Requested Cost(1) | Capital Structure | Weighted Cost |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Long-term debt | 6.05% | 46% | 2.78% | 5.69% | 47% | 2.67% |
| Preferred stock | 5.68% | 2% | 0.11% | 5.60% | 1% | 0.06% |
| Return on common equity | 11.35% | 52% | 5.90% | 11.00% | 52% | 5.72% |
| Overall Rate of Return |  |  | 8.79% |  |  | 8.45% |

(1) In October 2012, the Utility filed an updated application with the CPUC to update its requested costs of long-term debt from 5.69% to 5.52%

The Utility also has requested that the CPUC approve the continuation of the annual cost of capital adjustment mechanism that has been in effect since 2008. The mechanism would be triggered in a particular year if the 12-month October-through-September average of the applicable Moody's Investors Service utility bond index increases or decreases by more than 100 basis points from the benchmark. If the adjustment mechanism is triggered, the Utility’s authorized ROE beginning on the next January 1st would be adjusted by one-half of the increase or decrease. In addition, the Utility’s authorized long-term debt and preferred stock costs would be updated to reflect actual August month-end embedded costs and forecasted interest rates for variable long-term debt and new long-term debt and preferred stock scheduled to be issued in the coming year. In any year where the 12-month average yield triggers an automatic ROE adjustment, that average yield would become the new benchmark.

The CPUC split the proceeding into two phases with the first phase addressing test year 2013 cost of capital issues and the second phase addressing the cost of capital adjustment mechanism. The CPUC recently concluded evidentiary hearings on the first phase of the proceeding and is expected to issue a final decision before the end of 2012. The Utility has proposed that any changes to its revenue requirements resulting from the CPUC’s cost of capital decision be effective January 1, 2013. (The Utility estimates that its 2013 revenue requirement associated with the requested cost of capital would be approximately $100 million less than the currently authorized revenue requirement.)

Evidentiary hearings for the second phase are scheduled for January 2013 with a final decision expected in the second quarter of 2013. The Utility has proposed to file its next full cost of capital application with the CPUC in April 2015 for test year 2016.

### Diablo Canyon Nuclear Power Plant

In March 2012, the NRC issued several orders to the owners of all U.S. operating nuclear reactors to implement the highest-priority recommendations issued by the NRC’s task force to incorporate the lessons learned from the March 2011 earthquake and tsunami that caused significant damage to nuclear facilities in Japan. The NRC also requested nuclear power plant owners to provide additional information about seismic and flooding hazards and emergency preparedness, which the NRC may consider in future regulatory proceedings or actions. As applied to the Utility, the NRC’s March 12, 2012 orders require the Utility to develop mitigation strategies to respond to potential extreme natural events resulting in the loss of power at Diablo Canyon and to enhance the instrumentation used in the plant’s spent fuel pool to better monitor water temperature. The Utility, as well as other nuclear power plant owners, are required to submit an integrated plan, including a description of how compliance with the orders will be achieved, to the NRC by February 2013. After reviewing the plans, the NRC plans to issue facility-specific orders, as necessary, imposing license conditions that address the requirements of the orders. Each nuclear power plant owner will be required to be in full compliance with the NRC orders within two refueling outages or by December 31, 2016, whichever comes first.

The NRC operating licenses for the two generation units at Diablo Canyon include various license conditions related to seismic design and safety that were based on seismic information and studies that were used to develop the seismic qualification basis for plant structures, systems, and components at Diablo Canyon. In January 2011, the Utility provided updated information to the NRC about seismological information about a newly discovered earthquake fault called the Shoreline fault. In the report, the Utility concluded that the seismic risks associated with the Shoreline fault were within the existing design basis of the current operating licenses. On October 12, 2012, the NRC notified the Utility that the NRC agreed with the Utility’s seismic analysis. The NRC also noted that the Utility was conducting offshore and onshore two-and three-dimensional seismic studies and stated that if, during the collection of the data, new faults are discovered or information is uncovered that would suggest the Shoreline fault is more capable than currently believed, the staff expects that the Utility will provide the NRC with an interim evaluation that describes actions taken or planned to address the higher seismic hazard relative to the design basis, as appropriate, as part of the evaluations requested in the NRC staff's March 12, 2012 request for information. The NRC also stated that changes to the licensing basis may be appropriate to capture the information developed in response to the March 12, 2012 request for information. The Utility expects that the seismic studies will not be completed until 2013 or 2014.

The NRC’s operating license for Diablo Canyon Unit 1 expires in November 2024 and the operating license for Unit 2 expires in August 2025. The Utility has filed an application at the NRC seeking renewal of the licenses, a process that is expected to take several years. (At the Utility’s request, the NRC has agreed to delay processing the Utility’s pending license renewal application until the Utility completes the seismic studies discussed above.) On August 7, 2012, the NRC ruled that it will not issue final decisions in licensing or re-licensing proceedings, including the Utility’s application, until it has reconsidered the environmental impacts of the temporary and permanent storage of spent nuclear fuel to comply with the National Environmental Policy Act (“NEPA”). The NRC issued its order in response to a federal appellate court’s ruling issued in June 2012 that found that the NRC had failed to comply with the NEPA before issuing its “waste confidence decision” in which the NRC determined that spent nuclear fuel can be safely managed until a permanent off-site repository is established. In its August 2012 ruling, the NRC stated that it would consider all available options for resolving the waste confidence issue, which could include generic or site-specific NRC actions, or some combination of both. The NRC has instructed its staff to develop and issue a new waste confidence decision and temporary storage rule by September 2014, develop an environmental impact statement to support the rulemaking, and refrain from site-specific review of waste-confidence issues except in rare circumstances. (See Item 1.A. Risk Factors, below.)

In September 2012, the CPUC granted the Utility’s request for authority to recover an additional $47 million in rates to conduct the seismic studies discussed above. Actual costs of the seismic studies may differ from estimates depending on the procurement process, environmental permitting processes, and required environmental monitoring and mitigation. The Utility expects that it will incur additional costs to comply with the NRC’s March 12, 2012 order to implement new requirements the NRC may adopt after it reviews the information submitted in response to the NRC’s March 12, 2012 request for information. Although the Utility intends to request CPUC approval to recover estimated compliance costs as part of the 2014 GRC funding request, the Utility’s forecast may be insufficient or the CPUC may not fully approve recovery of such costs in rates.

### Other Matters

### Electric Distribution Facilities

The Utility has been conducting a system-wide review of its maintenance plans for underground and overhead electric distribution facilities after the Utility reported to the CPUC in July 2012 that the Utility had determined, based on a review of its maintenance plans and distribution maps, that some of its facilities in one of its divisions were not patrolled and inspected at the periodic intervals required by the CPUC’s rules. As of October 25, 2012, preliminary data indicated that approximately 0.4% of the Utility’s total electric distribution facilities are not included in maintenance plans and were not patrolled or inspected at the intervals required by CPUC rules. The Utility plans to submit the results of its system-wide assessment to the CPSD, along with the Utility’s plan for completing the inspections and performing any remedial work that may be identified.

The Utility has also reported to CPSD that it planned to re-inspect electric distribution underground and overhead facilities that had been identified as inspected by a contractor after the Utility performed a sampling of the contractor’s inspections of electric underground facilities and determined that the inspection practices used by some of the contractor’s employees did not meet the Utility’s quality standards for installation of verification tags.

PG&E Corporation and the Utility are uncertain how the above matters will affect the other regulatory proceedings and current investigations involving the Utility, or whether additional proceedings or investigations will be commenced that could result in regulatory orders or the imposition of fines or penalties on the Utility.

### Electric Rate Design

In June 2012, the CPUC opened a rulemaking proceeding to examine electric rate design for residential customers among California’s electric utilities and consider regulatory and legislative changes that may be needed to the current rate structure. PG&E Corporation and the Utility are uncertain how the outcome of this rulemaking proceeding will affect the Utility’s future electric rate structure.

### ENVIRONMENTAL MATTERS

The Utility’s operations are subject to extensive federal, state, and local laws and permits relating to the protection of the environment and the safety and health of the Utility’s personnel and the public. (See “Risk Factors” in the 2011 Annual Report.) These laws and requirements relate to a broad range of the Utility’s activities, including the remediation of hazardous wastes; the reporting and reduction of carbon dioxide and other GHG emissions; the discharge of pollutants into the air, water, and soil; and the transportation, handling, storage, and disposal of spent nuclear fuel. Significant developments that have occurred since the 2011 Annual Report was filed with the SEC are discussed below.

### Natural Gas Compressor Sites

The Utility is legally responsible for remediating groundwater contamination caused by hexavalent chromium used in the past at the Utility’s natural gas compressor sites near Hinkley, California and Topock, Arizona. The Utility is also required to take measures to abate the effects of the contamination on the environment.

### Hinkley Site

The Utility’s remediation and abatement efforts at the Hinkley site are subject to the regulatory authority of the California Regional Water Quality Control Board, Lahontan Region (“Regional Board”). The Regional Board has issued several orders directing the Utility to implement interim remedial measures to reduce the mass of the underground plume of hexavalent chromium, monitor and control movement of the plume, and provide replacement water to affected residents.

In June 2012, the Regional Board issued an amended cleanup and abatement order to allow the Utility to implement a voluntary whole house water replacement program for approximately 300 resident households located within or near the chromium plume boundary. Eligible residents were given until October 15, 2012 to decide whether to accept a replacement water supply or have the Utility purchase their properties, or alternatively not participate in the program. The majority of eligible residents opted to accept the Utility’s offer to purchase their property. The Utility is required to complete implementation of the whole house water replacement systems by August 31, 2013. The Utility will maintain and operate the whole house replacement systems for five years or until the State of California has adopted a drinking water standard specifically for hexavalent chromium at which time the program will be evaluated.

In August 2012, the Regional Board issued a draft environmental impact report (“EIR”) that evaluated several alternatives for remediating groundwater contamination using a combination of different remedial methods, including using pumped groundwater from extraction wells to irrigate agricultural land and in-situ treatment of the contaminated water. The Utility expects that the Regional Board will consider certification of the final EIR in 2013.

At September 30, 2012, $227 million was accrued in PG&E Corporation’s and the Utility’s Condensed Consolidated Balance Sheets for estimated undiscounted future remediation costs associated with the Hinkley natural gas compressor site, compared to $149 million accrued at December 31, 2011. The increase primarily reflects the Utility’s best estimate of costs associated with providing water replacement systems to eligible residents or purchasing property from eligible residents, as described above. Remediation costs for the Hinkley natural gas compressor site are not recovered from customers.

Future costs will depend on many factors, including the Regional Board’s certification of the final EIR, the levels of hexavalent chromium the Utility is required to use as the standard for remediation, the Utility’s required time frame for remediation, and adoption of a final drinking water standard currently under development by the State of California, as mentioned above. As more information becomes known regarding these factors, estimates and assumptions regarding the amount of liability incurred may be subject to further changes. Future changes in estimates may have a material impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, and cash flows.

### Topock Site

The Utility’s remediation and abatement efforts at the Topock site are subject to the regulatory authority of the California Department of Toxic Substances Control (“DTSC”) and the U.S. Department of the Interior (“DOI”). As directed by the DTSC, the Utility has implemented interim remediation measures, including a system of extraction wells and a treatment plant designed to prevent movement of a hexavalent chromium plume toward the Colorado River. The DTSC has certified the final EIR and approved the Utility’s final remediation plan for the groundwater plume, under which the Utility will implement an in-situ groundwater treatment system to convert hexavalent chromium into a non-toxic and non-soluble form of chromium. The Utility has completed the preliminary design stage for implementing the final groundwater remedy and plans to submit its intermediate design plan to the DTSC and the DOI in January 2013 and a final plan for approval in late 2013. In developing its intermediate plan, the Utility is currently evaluating input received from regulatory agencies and other stakeholders, exploring potential sources of fresh water to be used as part of the remedy, and performing other engineering activities necessary to complete the remedial design.

At September 30, 2012, $236 million was accrued in PG&E Corporation’s and the Utility’s Condensed Consolidated Balance Sheets for estimated undiscounted future remediation costs associated with the Topock site, compared to $218 million accrued at December 31, 2011. As the Utility completes its remedial design plan and more information becomes known regarding the extent of work to be performed to implement the final groundwater remedy, estimates and assumptions regarding the amount of liability incurred may be subject to change. The Utility expects to recover 90% of its remediation costs for the Topock site from customers. Future changes in estimates could have a material impact on PG&E Corporation’s and the Utility’s future financial condition.

### Greenhouse Gas Regulation

California Assembly Bill 32 requires the gradual reduction of statewide GHG emissions to the 1990 level by 2020. The California Air Resources Board (“CARB”) has approved various regulations, including regulations to establish a state-wide, comprehensive “cap-and-trade” program that sets a gradually declining limit (or “cap”) on the amount of GHGs that may be emitted by the major sources of GHG emissions. The cap-and-trade compliance period will begin on January 1, 2013. The CARB has allocated a fixed number of emission allowances (i.e., the rights to emit GHGs) to regulated electric distribution utilities, such as the Utility. The Utility is required to consign allocated emission allowances into periodic auctions, the first of which is scheduled to be held on November 14, 2012. All proceeds received from auction participants, as well as the Utility’s compliance costs under the cap-and-trade program, are expected to be passed through to customers through rates.

Under the CARB’s regulations, emitters (also known as covered entities) also can purchase “offset credits” from certified parties that develop environmental projects in sectors not regulated under the cap, such as reforestation and methane capture projects. Emitters would be able to use the offset credits to satisfy up to 8% of their compliance obligations. In March 2012, a lawsuit was filed in the San Francisco Superior Court challenging the CARB’s regulations pertaining to offset credits. Evidentiary hearings are scheduled for November 2012, but it is currently uncertain when this challenge will be resolved and how its resolution will affect implementation of the CARB’s cap-and-trade program.

### Renewable Energy Resources

California’s new Renewables Portfolio Standard (“RPS”) program increases the amount of renewable energy that load-serving entities (“LSE”s), such as the Utility, must deliver to their customers from at least 20% of their total retail sales, as required by the prior law, to 33% of their total retail sales. The new RPS program, which became effective in December 2011, established three initial compliance periods: 2011 through 2013, 2014 through 2016, and 2017 through 2020. The RPS compliance requirement that must be met for each of these compliance periods will gradually increase through 2020 and will be 33% on an annual basis thereafter.

In June 2012, the CPUC adopted rules for transitioning between the prior 20% RPS program and the new 33% RPS program, applying excess procurement quantities across compliance periods, using procurement from short-term contracts to meet compliance requirements, and reporting RPS compliance annually to the CPUC. In future decisions, the CPUC is expected to address the process for seeking a reduction or waiver of compliance obligations. The CPUC is also expected to determine whether to change the penalty provisions applicable to the former RPS program, which had generally established a maximum penalty of $25 million per year on each retail seller that had an unexcused failure to meet its compliance obligation.

The Utility has made substantial financial commitments under third-party renewable energy contracts to meet RPS procurement quantity requirements. (See Note 10 of the Notes to the Condensed Consolidated Financial Statements.) The Utility currently forecasts that it will comply with its procurement requirements. The costs incurred by the Utility under third-party contracts to meet RPS requirements are expected to be recovered with other procurement costs through rates. The costs of Utility-owned renewable generation projects will be recoverable through traditional cost-of-service ratemaking mechanisms provided that costs do not exceed the maximum amounts authorized by the CPUC for the respective project.

### Water Quality

The U.S. Environmental Protection Agency (“EPA”) published draft regulations in April 2011 to implement the requirements of the federal Clean Water Act which requires that cooling water intake structures at electric power plants, such as the nuclear generation facilities at Diablo Canyon, reflect the best technology available to minimize adverse environmental impacts. In June 2012, the EPA proposed changes to these draft regulations which, if adopted, would provide more flexibility in complying with some of the requirements. The EPA is required to issue final regulations by July 2013.

### OFF-BALANCE SHEET ARRANGEMENTS

PG&E Corporation and the Utility do not have any off-balance sheet arrangements that have had, or are reasonably likely to have, a current or future material effect on their financial condition, changes in financial condition, revenues or expenses, results of operations, liquidity, capital expenditures, or capital resources, other than those discussed in Note 2 (PG&E Corporation’s tax equity financing agreements) and Note 10 (the Utility’s commodity purchase agreements) of the Notes to the Condensed Consolidated Financial Statements.

### CONTINGENCIES

In addition to the contingencies described under “Natural Gas Matters” above, PG&E Corporation and the Utility have significant contingencies arising from their operations, including contingencies related to Chapter 11 disputed claims, guarantees, regulatory proceedings, nuclear operations, legal matters, environmental compliance and remediation, and tax matters. (See Notes 9 and 10 of the Notes to the Condensed Consolidated Financial Statements.)

### RISK MANAGEMENT ACTIVITIES

The Utility and PG&E Corporation, mainly through its ownership of the Utility, are exposed to market risk, which is the risk that changes in market conditions will adversely affect net income or cash flows. PG&E Corporation and the Utility face market risk associated with their operations; their financing arrangements; the marketplace for electricity, natural gas, electric transmission, natural gas transportation, and storage; other goods and services; and other aspects of their businesses. PG&E Corporation and the Utility categorize market risks as “price risk” and “interest rate risk.” The Utility is also exposed to “credit risk,” the risk that counterparties fail to perform their contractual obligations.

The Utility actively manages market risk through risk management programs designed to support business objectives, discourage unauthorized risk-taking, reduce commodity cost volatility, and manage cash flows. The Utility uses derivatives only for non-trading purposes (i.e., risk mitigation) and not for speculative purposes. The Utility’s risk management activities include the use of energy and financial instruments such as forward contracts, futures, swaps, options, and other instruments and agreements, most of which are accounted for as derivatives. Some contracts are accounted for as leases.

On July 21, 2010, President Obama signed into law federal financial reform legislation, the Dodd-Frank Wall Street Reform and Consumer Protection Act. PG&E Corporation and the Utility are implementing programs to comply with final regulations that have been issued and continue to monitor draft regulations, including evaluation of potential impacts on the Utility’s procurement activities and risk management programs.

### Commodity Price Risk

The Utility is exposed to commodity price risk as a result of its electricity and natural gas procurement activities, including the procurement of natural gas and nuclear fuel necessary for electricity generation and natural gas procurement for core customers. As long as the Utility can conclude that it is probable that its reasonably incurred wholesale electricity procurement costs and natural gas costs are recoverable, fluctuations in electricity and natural gas prices will not affect earnings but may impact cash flows. The Utility’s natural gas transportation and storage costs for core customers are also fully recoverable through a ratemaking mechanism.

The Utility’s natural gas transportation and storage costs for non-core customers may not be fully recoverable. The Utility is subject to price and volumetric risk for the portion of intrastate natural gas transportation and storage capacity that has not been sold under long-term contracts providing for the recovery of all fixed costs through the collection of fixed reservation charges. The Utility sells most of its capacity based on the volume of gas that the Utility’s customers actually ship, which exposes the Utility to volumetric risk.

The Utility uses value-at-risk to measure its shareholders’ exposure to price and volumetric risks resulting from variability in the price of, and demand for, natural gas transportation and storage services that could impact revenues due to changes in market prices and customer demand. Value-at-risk measures this exposure over a rolling 12-month forward period and assumes that the contract positions are held through expiration. This calculation is based on a 95% confidence level, which means that there is a 5% probability that the impact to revenues on a pre-tax basis, over the rolling 12-month forward period, will be at least as large as the reported value-at-risk. Value-at-risk uses market data to quantify the Utility’s price exposure. When market data is not available, the Utility uses historical data or market proxies to extrapolate the required market data. Value-at-risk as a measure of portfolio risk has several limitations, including, but not limited to, inadequate indication of the exposure to extreme price movements and the use of historical data or market proxies that may not adequately capture portfolio risk.

The Utility’s value-at-risk calculated under the methodology described above was approximately $13 million at September 30, 2012. The Utility’s approximate high, low, and average values-at-risk during the 12 months ended September 30, 2012 were $13 million, $10 million, and $11 million, respectively. (See Note 7 of the Notes to the Condensed Consolidated Financial Statements for further discussion of price risk management activities.)

### Interest Rate Risk

Interest rate risk sensitivity analysis is used to measure interest rate risk by computing estimated changes in cash flows as a result of assumed changes in market interest rates. At September 30, 2012, if interest rates changed by 1% for all current PG&E Corporation and Utility variable rate and short-term debt and investments, the change would affect net income for the next 12 months by $6 million, based on net variable rate debt and other interest rate-sensitive instruments outstanding.

### Energy Procurement Credit Risk

The Utility conducts business with counterparties mainly in the energy industry, including other California investor-owned electric utilities, municipal utilities, energy trading companies, financial institutions, and oil and natural gas production companies located in the United States and Canada. If a counterparty fails to perform on its contractual obligation to deliver electricity or gas, then the Utility may find it necessary to procure electricity or gas at current market prices, which may be higher than the contract prices.

The Utility manages credit risk associated with its counterparties by assigning credit limits based on evaluations of their financial conditions, net worth, credit ratings, and other credit criteria as deemed appropriate. Credit limits and credit quality are monitored periodically. The Utility ties many energy contracts to master commodity enabling agreements that may require security (referred to as “Credit Collateral” in the table below). Credit collateral may be in the form of cash or letters of credit. The Utility may accept other forms of performance assurance in the form of corporate guarantees of acceptable credit quality or other eligible securities (as deemed appropriate by the Utility). Credit collateral or performance assurance may be required from counterparties when current net receivables and replacement cost exposure exceed contractually specified limits.

The following table summarizes the Utility’s net credit risk exposure to its counterparties, as well as the Utility’s credit risk exposure to counterparties accounting for greater than 10% net credit exposure, as of September 30, 2012 and December 31, 2011:

*(in millions)*

|  | September 30, 2012 | December 31, 2011 |
| --- | ---: | ---: |
| Gross credit exposure before credit collateral(1) | $127 | $151 |
| Credit collateral | (10) | (13) |
| Net credit exposure(2) | $117 | $138 |
| Number of wholesale customers or counterparties \>10% | 2 | 2 |
| Net credit exposure to wholesale customers or counterparties \>10% | $78 | $106 |

(1) Gross credit exposure equals mark-to-market value on physically and financially settled contracts, notes receivable, and net receivables (payables) where netting is contractually allowed. Gross and net credit exposure amounts reported above do not include adjustments for time value or liquidity.

(2) Net credit exposure is the Gross Credit Exposure minus Credit Collateral (cash deposits and letters of credit). For purposes of this table, parental guarantees are not included as part of the calculation.

### CRITICAL ACCOUNTING POLICIES

The preparation of the Condensed Consolidated Financial Statements in accordance with U.S. generally accepted accounting principles involved the use of estimates and assumptions that affect the recorded amounts of assets and liabilities as of the date of the Condensed Consolidated Financial Statements and the reported amounts of revenues and expenses during the reporting period. PG&E Corporation and the Utility consider their accounting policies for regulatory assets and liabilities, loss contingencies associated with environmental remediation liabilities and legal and regulatory matters, asset retirement obligations, and pension and other postretirement benefit plans to be critical accounting policies due, in part, to these accounting policies’ complexity, relevance and materiality to the financial position and results of operations of PG&E Corporation and the Utility, and requirement to use material judgments and estimates. Actual results may differ substantially from these estimates. These accounting policies and their key characteristics are discussed in detail in the 2011 Annual Report.

## Market risk

As filed, 606 characters.

PG&E Corporation’s and the Utility’s primary market risk results from changes in energy commodity prices. PG&E Corporation and the Utility engage in price risk management activities for non-trading purposes only. Both PG&E Corporation and the Utility may engage in these price risk management activities using forward contracts, futures, options, and swaps to hedge the impact of market fluctuations on energy commodity prices and interest rates. (See the section above entitled “Risk Management Activities” in Item 2: Management’s Discussion and Analysis of Financial Condition and Results of Operations.)

## Controls and procedures

As filed, 1,561 characters.

Based on an evaluation of PG&E Corporation’s and the Utility’s disclosure controls and procedures as of September 30, 2012, PG&E Corporation’s and the Utility’s respective principal executive officers and principal financial officers have concluded that such controls and procedures were effective to ensure that information required to be disclosed by PG&E Corporation and the Utility in reports that the companies file or submit under the Securities Exchange Act of 1934 (“1934 Act”) is recorded, processed, summarized, and reported within the time periods specified in the SEC rules and forms. In addition, PG&E Corporation’s and the Utility’s respective principal executive officers and principal financial officers have concluded that such controls and procedures were effective in ensuring that information required to be disclosed by PG&E Corporation and the Utility in the reports that PG&E Corporation and the Utility file or submit under the 1934 Act is accumulated and communicated to PG&E Corporation’s and the Utility’s management, including PG&E Corporation’s and the Utility’s respective principal executive officers and principal financial officers, or persons performing similar functions, as appropriate to allow timely decisions regarding required disclosure.

There were no changes in internal control over financial reporting that occurred during the quarter ended September 30, 2012 that have materially affected, or are reasonably likely to materially affect, PG&E Corporation’s or the Utility’s internal control over financial reporting.

## Risk factors

As filed, 12,660 characters.

For information about the significant risks that could affect PG&E Corporation’s and the Utility’s future financial condition, results of operations, and cash flows, see the section of the 2011 Annual Report entitled “Risk Factors,” as supplemented below, and the section of this quarterly report entitled “Cautionary Language Regarding Forward-Looking Statements.”

### CPUC Pending Investigations and Rulemaking Proceeding Related to Natural Gas Matters, Litigation Arising from the San Bruno Accident

As discussed above in the section entitled “Natural Gas Matters − Pending CPUC Investigations and Enforcement Ma**t**ters,” in Item 2: Management’s Discussion and Analysis of Financial Condition and Results of Operations, the CPUC is conducting three investigations pertaining to the Utility’s natural gas operations, including an investigation of the San Bruno accident. (For more information, see Note 10 of the Notes to the Condensed Consolidated Financial Statements.) In 2012, the CPSD issued reports in each of these investigations alleging that the Utility committed numerous violations of applicable laws and regulations and recommending that the CPUC impose penalties on the Utility and began hearings in each of the investigations. The CPUC is also considering testimony submitted by the CPSD in September 2012 that consisted of a financial analysis report prepared by a consultant engaged by the CPSD to examine PG&E Corporation’s financial health and to provide an estimate of its ability to raise equity capital sufficient to fund a CPUC-imposed penalty on the Utility. The consultant concluded that PG&E Corporation could raise approximately $2.25 billion in addition to equity PG&E Corporation had already forecasted it would issue in 2012 to fund CPUC imposed penalties on the Utility.

On October 11, 2012, the procedural schedules for evidentiary hearings and briefings in the three investigations, as well as the submittal of the Utility’s response on the financial resources issue, were suspended until November 1, 2012, to enable the CPSD, the Utility, and other parties to continue to engage in negotiations to reach a stipulated outcome of these investigations. Any settlement agreement that may be reached would be subject to CPUC approval. The CPUC would hold public hearings to consider comments and objections to the proposed stipulated outcome before issuing a final decision. Even if the CPUC approves a stipulated outcome, implementation could be delayed pending the resolution of appeals or applications for rehearing that may be filed after a final decision is issued.

PG&E Corporation and the Utility continue to believe it is probable that the CPUC will impose total penalties of at least $200 million on the Utility with these investigations and other enforcement matters relating to self-reports the Utility has filed regarding its compliance with regulations related to the safety of natural gas facilities and natural gas operating practices. They are unable to estimate the reasonably possible amount of penalties in excess of this amount and such amounts could be material.

These estimates, and the assumptions on which they are based, are subject to change based on many factors, including developments that may occur during the settlement negotiations, the terms of a proposed settlement agreement that may be reached, whether and when the CPUC approves the proposed settlement agreement, and rulings and decisions by the CPUC and the administrative law judges presiding over these proceedings. Future changes in these estimates or assumptions could have a material impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, and cash flows. Further, the CPSD may issue additional citations and impose penalties on the Utility in connection with other self-reports the Utility has filed, or may file in the future, regarding its compliance with natural gas regulations. In addition, on October 12, 2012, a proposed decision was issued that, if adopted by the CPUC, would deny the Utility’s request to recover a material amount of the costs the Utility has incurred, and forecasts that it will incur through 2014, to perform work under the pipeline safety enhancement plan. Assuming a final decision is not issued until after December 31, 2012, the Utility would be unable to recover 2011 and 2012 expenses. The proposed decision also recommends that the authorized rate of ROE on authorized capital expenditures made under the plan be reduced for five years. (See “Natural Gas Matters−CPUC Gas Safety Rulemaking Proceeding” and “Results of Operations−Operating and Maintenance Expenses” in Item 2: Management’s Discussion and Analysis of Financial Condition and Results of Operations.”) The ultimate amount of unrecoverable pipeline-related costs the Utility incurs will depend on many factors, including the terms of the CPUC’s final decision and the extent to which actual costs incurred under the plan exceed authorized amounts.

Future developments in the pending litigation and criminal investigation arising from the San Bruno accident also could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, and cash flows. (See the sections entitled “Criminal Investigation,” “Third-Party Claims,” and “Class Action Complaint” under the heading “Natural Gas Matters” in Item 2: Management’s Discussion and Analysis of Financial Condition and Results of Operations.)

### Diablo Canyon

In March 2012, the NRC issued several orders to the owners of all U.S. operating nuclear reactors to implement the highest-priority recommendations issued by the NRC’s task force to incorporate the lessons learned from the March 2011 earthquake and tsunami that caused significant damage to nuclear facilities in Japan. The NRC has also requested nuclear power plant owners to provide additional information about seismic and flooding hazards and emergency preparedness, which the NRC may consider in future regulatory proceedings or actions. As applied to the Utility, the orders require the Utility to re-evaluate the seismic hazards at Diablo Canyon and develop mitigation strategies to respond to potential extreme natural events resulting in the loss of power at Diablo Canyon and to enhance the instrumentation used in the plant’s spent fuel pool to better monitor water temperature. The Utility, as well as other nuclear power plant owners, are required to submit an integrated plan, including a description of how compliance with the orders will be achieved, to the NRC by February 2013. After reviewing the plans, the NRC plans to issue facility-specific orders, as necessary, imposing license conditions that address the requirements of the orders. Each nuclear power plant owner will be required to be in full compliance with the NRC orders within two refueling outages or by December 31, 2016, whichever comes first.

The Utility has requested that the NRC renew the operating licenses for the two units at Diablo Canyon. The NRC’s operating license for Diablo Canyon Unit 1 expires in November 2024 and the operating license for Unit 2 expires in August 2025. At the Utility’s request, the NRC has agreed to delay processing the Utility’s pending license renewal application until the Utility completes extensive seismic studies of onshore and offshore areas surrounding Diablo Canyon. The Utility also will submit new data collected from the seismic studies to the NRC pursuant to the NRC’s March 12, 2012 request. The Utility expects that the seismic studies will not be completed until 2013 or 2014.

On August 7, 2012, the NRC ruled that it will not issue final decisions in licensing or re-licensing proceedings, including the Utility’s application, until it has reconsidered the environmental impacts of the temporary and permanent storage of spent nuclear fuel to comply with the National Environmental Policy Act (“NEPA”). The NRC issued its order in response to a federal appellate court’s ruling issued in June 2012 that found that the NRC had failed to comply with the NEPA before issuing its “waste confidence decision” in which the NRC determined that spent nuclear fuel can be safely managed until a permanent off-site repository is established. In its August 2012 ruling, the NRC stated that it would consider all available options for resolving the waste confidence issue, which could include generic or site-specific NRC actions, or some combination of both. The NRC has instructed its staff to develop and issue a new waste confidence decision and temporary storage rule by September 2014, develop an environmental impact statement to support the rulemaking, and refrain from site-specific review of waste-confidence issues except in rare circumstances.

The Utility expects that it will incur additional costs to comply with the NRC’s March 12, 2012 order. The Utility also may incur costs to comply with new requirements the NRC may adopt after it reviews the information submitted in response to the NRC’s March 12, 2012 request for information. Further, the new waste confidence decision and temporary storage rule may require the Utility to incur additional costs in order to obtain NRC approval of the Utility’s re-licensing application. The CPUC may not authorize the Utility to recover all of its compliance costs.

PG&E Corporation and the Utility are unable to predict whether the Utility will be able to comply with new requirements or new seismic license conditions that may adopted by the NRC. If the Utility is unable to comply with the new requirements or license conditions, the NRC may order the Utility to cease operating Diablo Canyon or deny the Utility’s re-licensing application. Alternatively, the Utility may determine that compliance is not economically feasible and may choose to cease operating Diablo Canyon.

### Hinkley Natural Gas Compressor Station

The Utility is legally responsible for remediating groundwater contamination caused by hexavalent chromium used in the past at the Hinkley natural gas compressor site. As discussed above in the section entitled “Environmental Matters,” in Item 2: Management’s Discussion and Analysis of Financial Condition and Results of Operations, several orders have been issued to require the Utility to take measures to remediate the underground chromium plume and abate the effects of the contamination on the environment, including an order requiring the Utility to offer affected residents a choice to either have the Utility install a permanent whole house water replacement system or purchase their property. Eligible residents were given until October 15, 2012 to make a choice and the majority have chosen to have the Utility purchase their property. For residents who have chosen a water replacement system, the Utility is required to maintain and operate the systems for five years or until the State of California has adopted a drinking water standard specifically for hexavalent chromium at which time the program will be evaluated.

In August 2012, the Regional Board issued a draft environmental impact report (“EIR”) that evaluated several alternatives for remediating groundwater contamination using a combination of different remedial methods, including using pumped groundwater from extraction wells to irrigate agricultural land and in-situ treatment of the contaminated water. The Utility expects that the Regional Board will consider certification of the final EIR in 2013.

The Utility’s remediation and abatement costs associated with the Hinkley natural gas compressor site are not recoverable through rates or insurance. As a result, costs incurred for remediation at the Hinkley natural gas compressor site, as well as changes in the environmental remediation liability for the Hinkley natural gas compressor site, have materially affected PG&E Corporation’s and the Utility’s financial condition and results of operations.

Future costs will depend on many factors, including the Regional Board’s certification of the final EIR, the levels of hexavalent chromium the Utility is required to use as the standard for remediation, the Utility’s required time frame for remediation, and adoption of a final drinking water standard currently under development by the State of California, as mentioned above. As more information becomes known regarding these factors, estimates and assumptions regarding the amount of liability incurred may be subject to further changes. Future changes in estimates may have a material impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, and cash flows.

Filed Oct 29, 2012.
Source: SEC EDGAR, the filing index for accession 0001004980-12-000064. Last ingested by Listed: Nov 14, 2026, 23:58 ET. No prices; not investment advice.