# PG&E Corp: Form 10-Q for the period ended Jun 30, 2014

- Company: [PG&E Corp](/companies/pcg.md) (CIK 1004980)
- Form: 10-Q
- Filed: 2014-07-31
- Accepted by EDGAR: Jul 31, 2014, 20:34 ET
- Period: 2014-06-30
- Accession: 0001004980-14-000069
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/1004980/000100498014000069/form10q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/1004980/000100498014000069/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2014-06-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2014-04-01 to 2014-06-30 | $3.95bn | us-gaap:Revenues |
| Revenue | 6 months, 2014-01-01 to 2014-06-30 | $7.84bn | us-gaap:Revenues |
| Operating income | 3 months, 2014-04-01 to 2014-06-30 | $518.0m | us-gaap:OperatingIncomeLoss |
| Operating income | 6 months, 2014-01-01 to 2014-06-30 | $1.00bn | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2014-04-01 to 2014-06-30 | $188.0m | us-gaap:InterestExpense |
| Interest expense | 6 months, 2014-01-01 to 2014-06-30 | $373.0m | us-gaap:InterestExpense |
| Income tax | 3 months, 2014-04-01 to 2014-06-30 | $104.0m | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 6 months, 2014-01-01 to 2014-06-30 | $195.0m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2014-04-01 to 2014-06-30 | $271.0m | us-gaap:ProfitLoss |
| Net income | 6 months, 2014-01-01 to 2014-06-30 | $501.0m | us-gaap:ProfitLoss |
| Diluted EPS | 3 months, 2014-04-01 to 2014-06-30 | $0.57 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 6 months, 2014-01-01 to 2014-06-30 | $1.06 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2014-04-01 to 2014-06-30 | $0.57 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 6 months, 2014-01-01 to 2014-06-30 | $1.07 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2014-04-01 to 2014-06-30 | 469,000,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 6 months, 2014-01-01 to 2014-06-30 | 465,000,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 6 months, 2014-01-01 to 2014-06-30 | $1.28bn | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 6 months, 2014-01-01 to 2014-06-30 | $2.32bn | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Dividends paid | 6 months, 2014-01-01 to 2014-06-30 | $408.0m | us-gaap:PaymentsOfDividendsCommonStock |
| Cash and equivalents | at 2014-06-30 | $132.0m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2014-06-30 | $6.20bn | us-gaap:AssetsCurrent |
| Total assets | at 2014-06-30 | $57.02bn | us-gaap:Assets |
| Current liabilities | at 2014-06-30 | $6.65bn | us-gaap:LiabilitiesCurrent |
| Long-term debt | at 2014-06-30 | $13.97bn | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2014-06-30 | $0 | us-gaap:LongTermDebtCurrent |
| Short-term borrowings | at 2014-06-30 | $1.45bn | us-gaap:ShortTermBorrowings |
| Shareholders' equity | at 2014-06-30 | $15.03bn | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 85,060 characters.

### RESULTS OF OPERATIONS

### OVERVIEW

PG&E Corporation is a holding company whose primary operating subsidiary is Pacific Gas and Electric Company, a public utility operating in northern and central California. The Utility generates revenues mainly through the sale and delivery of electricity and natural gas to customers.

The Utility is regulated primarily by the CPUC and the FERC. The CPUC has jurisdiction over the rates and terms and conditions of service for the Utility’s electricity and natural gas distribution operations, electric generation, and natural gas transportation and storage. The FERC has jurisdiction over the rates and terms and conditions of service governing the Utility’s electric transmission operations and interstate natural gas transportation contracts. The NRC oversees the licensing, construction, operation, and decommissioning of the Utility’s nuclear generation facilities. The Utility also is subject to the jurisdiction of other federal, state, and local governmental agencies.

This is a combined quarterly report of PG&E Corporation and the Utility and should be read in conjunction with each company’s separate Condensed Consolidated Financial Statements and the Notes to the Condensed Consolidated Financial Statements included in this quarterly report. It should also be read in conjunction with the 2013 Annual Report.

### Summary of Changes in Net Income and Earnings per Share

The following table is a summary reconciliation of the key changes, after-tax, in PG&E Corporation’s income available for common shareholders and EPS compared to the prior year (see “Results of Operations” below for additional information):

*(in millions, except per share amounts)*

|  | Three Months Ended June 30, Earnings | EPS (Diluted) | Six Months Ended June 30, Earnings | EPS (Diluted) |
| --- | ---: | ---: | ---: | ---: |
| **Income Available for Common Shareholders - 2013** | $328 | $0.74 | $567 | $1.29 |
| Natural gas matters (1) | (40) | (0.08) | (27) | (0.06) |
| Growth in rate base earnings (2) | 6 | 0.01 | 11 | 0.02 |
| Timing of 2014 GRC expense recovery (3) | (21) | (0.04) | (41) | (0.08) |
| Increase in shares outstanding (4) | - | (0.04) | - | (0.07) |
| Other | (6) | (0.02) | (16) | (0.04) |
| **Income Available for Common Shareholders - 2014** | **$267** | **$0.57** | **$494** | **$1.06** |

(1) Represents the increase in net costs related to natural gas matters during the three and six months ended June 30, 2014 as compared to the same periods in 2013. These amounts are not recoverable through rates. See “Operating and Maintenance” below.

(2) Represents the impact of the increase in rate base as authorized in various rate cases during the three and six months ended June 30, 2014 as compared to the same periods in 2013.

(3) Represents additional capital-related expenses during the three and six months ended June 30, 2014 as compared to the same periods in 2013, with no corresponding increase in revenue. The CPUC has not yet issued a final decision on the Utility’s 2014 GRC request to increase revenues beginning on January 1, 2014. Upon receipt of a final decision, the Utility has been authorized to collect any final adopted increase in revenue requirements from January 1, 2014.

(4) Represents the impact of a higher number of weighted average shares of common stock outstanding during the three and six months ended June 30, 2014 as compared to the same periods in 2013. PG&E Corporation issues shares to fund its equity contributions to the Utility to maintain the Utility’s capital structure and fund operations, including unrecovered expenses related to natural gas matters.

### Key Factors Affecting Financial Results

PG&E Corporation and the Utility believe that their future results of operations, financial condition, and cash flows will be materially affected by the following factors :

- *The Timing and Outcome of Ratemaking Proceedings.* The majority of the Utility’s revenue requirements for the next several years will be determined by the outcomes of the 2014 GRC and the 2015 GT&S rate case. A proposed decision was recently issued in the Utility’s GRC that recommended an increase in 2014 revenue requirements of $453 million, or 6.8% over currently authorized amounts, compared to the Utility’s requested increase of $1,160 million. The proposed decision also recommended attrition increases of $322 million for 2015 and $371 million for 2016. Upon receipt of a final decision, the Utility has been authorized to collect any final adopted increase in revenue requirements from January 1, 2014. (See “2014 General Rate Case” below.) In the GT&S rate case, the Utility is seeking an increase in its 2015 revenue requirements of $555 million over the comparable authorized revenues for 2014, as well as attrition increases for 2016 and 2017. After the CPUC issues a final decision, the Utility’s authorized revenue requirements will be adjusted as of January 1, 2015. (See “2015 Gas Transmission and Storage Rate Case” below.) In addition, the Utility has two transmission owner rate cases pending at the FERC. (See “FERC Transmission Owner Rate Cases” below.) The positions taken by the intervening parties in these proceedings are often contentious and the outcome can be affected by many factors, including general economic conditions, the level of customer rates, regulatory policies, and political considerations.
- *The Ability of the Utility to Control Operating Costs and Capital Expenditures.* Net income is negatively affected when the authorized revenues are not sufficient for the Utility to recover the costs it actually incurs to provide utility services. (See “Results of Operations – Utility Revenues and Costs That Impact Earnings” below.) During the last GRC and GT&S rate case periods, the Utility incurred costs to improve the safety and reliability of its electric and natural gas operations that materially exceeded annual authorized revenues. PG&E Corporation’s and the Utility’s future results of operations, financial condition, and cash flows could be materially affected if the Utility’s actual costs differ from the amounts assumed or authorized in the final 2014 GRC and 2015 GT&S rate case decisions. (See “Regulatory Matters” below.) The Utility also forecasts that in 2014 it will incur unrecovered pipeline-related expenses ranging from $350 million to $450 million, including costs to perform continuing work under the Utility’s PSEP and other gas transmission safety work, as well as legal and other expenses. The Utility also could record charges in 2014 for PSEP capital if the Utility’s cost forecasts increase. (See “Pipeline Safety Enhancement Plan” below.) Differences between the amount or timing of the Utility’s actual costs and forecasted or authorized amounts may affect the Utility’s ability to earn its authorized ROE.
- *The Outcome of Pending Investigations and Enforcement Matters.* Three CPUC investigations are still pending against the Utility related to its natural gas operations and the San Bruno accident. It is uncertain when the outcome of these investigations will be determined. Under the SED’s penalty recommendation, the Utility estimates that its total unrecovered costs and fines related to natural gas transmission operations would be about $4.5 billion. (See “Pending CPUC Investigations” below.) The U.S. Attorney’s Office has filed a superseding criminal indictment against the Utility alleging that it violated the Pipeline Safety Act and illegally obstructed the NTSB’s investigation of the San Bruno accident that occurred on September 9, 2010. Based on the superseding indictment’s allegation that the Utility derived gross gains of approximately $281 million, and that victims suffered losses of approximately $565 million, the maximum alternative fine would be approximately $1.13 billion. (See “Criminal Indictment” and “Item 1.A. Risk Factors” below.) In addition, fines may be imposed, or other regulatory or governmental enforcement action could be taken, with respect to the natural gas matters described under “Other Enforcement Matters” below.
- *The Amount and Timing of the Utility’s Financing Needs.* PG&E Corporation contributes equity to the Utility as needed to maintain the Utility’s CPUC-authorized capital structure. For the six months ended June 30, 2014, PG&E Corporation issued common stock of $589 million and made equity contributions to the Utility of $580 million. PG&E Corporation forecasts that it will continue issuing a material amount of equity in 2014, primarily to support the Utility’s capital expenditures and to fund unrecovered costs. Depending on the outcome of the pending investigations and other enforcement matters described above, PG&E Corporation may be required to issue additional common stock to fund its equity contributions as the Utility pays fines and incurs additional unrecovered pipeline-related costs. These additional issuances could have a material dilutive effect on PG&E Corporation’s EPS. PG&E Corporation’s and the Utility’s ability to access the capital markets and the terms and rates of future financings could be affected by changes in their respective credit ratings, the outcome of the matters discussed under “Natural Gas Matters” below, general economic and market conditions, and other factors.

For more information about the factors and risks that could affect future results of operations, financial condition, and cash flows, or that could cause future results to differ from historical results, see the section entitled “Risk Factors” in the 2013 Annual Report and “Item 1A. Risk Factors” below. In addition, this quarterly report contains forward-looking statements that are necessarily subject to various risks and uncertainties. These statements reflect management’s judgment and opinions which are based on current estimates, expectations, and projections about future events and assumptions regarding these events and management's knowledge of facts as of the date of this report. See the section entitled “Cautionary Language Regarding Forward-Looking Statements” below for a list of some of the factors that may cause actual results to differ materially. PG&E Corporation and the Utility are not able to predict all the factors that may affect future results and do not undertake an obligation to update forward-looking statements, whether in response to new information, future events, or otherwise.

### RESULTS OF OPERATIONS

The consolidated results of operations consist primarily of balances related to the Utility, which are discussed below. The following table provides a summary of net income for the three and six months ended June 30, 2014 and 2013:

*(in millions)*

|  | Three Months Ended June 30, 2014 | 2013 | Six Months Ended June 30, 2014 | 2013 |
| --- | ---: | ---: | ---: | ---: |
| Consolidated Total | $267 | $328 | $494 | $567 |
| PG&E Corporation | 21 | 3 | 23 | 8 |
| Utility | $246 | $325 | $471 | $559 |

PG&E Corporation’s net income consists primarily of interest expense on long-term debt, other income from investments, and income taxes. Results for 2014 include a gain on investments of approximately $20 million, with no similar activity in 2013.

### Utility

The table below shows certain items from the Utility’s Condensed Consolidated Statements of Income for the three and six months ended June 30, 2014 and 2013. The tables separately identify the revenues and costs that impacted earnings from those that did not impact earnings. In general, expenses the Utility is authorized to pass through directly to customers (such as costs to purchase electricity and natural gas, as well as costs to fund public purpose programs) and the corresponding amount of revenues collected to recover those pass-through costs, do not impact earnings. In addition, expenses that have been specifically authorized, such as the payment of pension costs, and the corresponding revenues the Utility is authorized to collect to recover such costs, do not impact earnings.

Revenues that impact earnings are primarily those that have been authorized by the CPUC and the FERC to recover the Utility’s costs to own and operate its assets and to provide the Utility an opportunity to earn its authorized rate of return on rate base. Expenses that impact earnings are primarily those that the Utility incurs to own and operate its assets.

*(in millions)*

|  | Three Months Ended June 30, 2014 Revenues/Costs: That Impacted Earnings | That Did Not Impact Earnings | Total Utility | Three Months Ended June 30, 2013 Revenues/Costs: That Impacted Earnings | That Did Not Impact Earnings | Total Utility |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Electric operating revenues | $1,632 | $1,600 | $3,232 | $1,611 | $1,446 | $3,057 |
| Natural gas operating revenues | 454 | 265 | 719 | 431 | 287 | 718 |
| **Total operating revenues** | **2,086** | **1,865** | **3,951** | **2,042** | **1,733** | **3,775** |
| Cost of electricity | - | 1,349 | 1,349 | - | 1,189 | 1,189 |
| Cost of natural gas | - | 200 | 200 | - | 179 | 179 |
| Operating and maintenance | 1,005 | 316 | 1,321 | 891 | 365 | 1,256 |
| Depreciation, amortization, and decommissioning | 556 | - | 556 | 516 | - | 516 |
| **Total operating expenses** | **1,561** | **1,865** | **3,426** | **1,407** | **1,733** | **3,140** |
| **Operating income** | **525** | **-** | **525** | **635** | **-** | **635** |
| Interest income (1) |  |  | 3 |  |  | 3 |
| Interest expense (1) |  |  | (185) |  |  | (171) |
| Other income, net (1) |  |  | 17 |  |  | 22 |
| Income before income taxes |  |  | 360 |  |  | 489 |
| Income tax provision (1) |  |  | 110 |  |  | 160 |
| Net income |  |  | 250 |  |  | 329 |
| Preferred stock dividend requirement (1) |  |  | 4 |  |  | 4 |
| **Income Available for Common Stock** |  |  | **$246** |  |  | **$325** |

(1) These items impacted earnings for the three months ended June 30, 2014 and 2013.

*(in millions)*

|  | Six Months Ended June 30, 2014 Revenues/Costs: That Impacted Earnings | That Did Not Impact Earnings | Total Utility | Six Months Ended June 30, 2013 Revenues/Costs: That Impacted Earnings | That Did Not Impact Earnings | Total Utility |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Electric operating revenues | $3,217 | $3,015 | $6,232 | $3,198 | $2,657 | $5,855 |
| Natural gas operating revenues | 925 | 684 | 1,609 | 870 | 721 | 1,591 |
| **Total operating revenues** | **4,142** | **3,699** | **7,841** | **4,068** | **3,378** | **7,446** |
| Cost of electricity | - | 2,559 | 2,559 | - | 2,172 | 2,172 |
| Cost of natural gas | - | 560 | 560 | - | 525 | 525 |
| Operating and maintenance | 2,038 | 580 | 2,618 | 1,911 | 681 | 2,592 |
| Depreciation, amortization, and decommissioning | 1,094 | - | 1,094 | 1,019 | - | 1,019 |
| **Total operating expenses** | **3,132** | **3,699** | **6,831** | **2,930** | **3,378** | **6,308** |
| **Operating income** | **1,010** | **-** | **1,010** | **1,138** | **-** | **1,138** |
| Interest income (1) |  |  | 5 |  |  | 4 |
| Interest expense (1) |  |  | (364) |  |  | (341) |
| Other income, net (1) |  |  | 37 |  |  | 46 |
| Income before income taxes |  |  | 688 |  |  | 847 |
| Income tax provision (1) |  |  | 210 |  |  | 281 |
| Net income |  |  | 478 |  |  | 566 |
| Preferred stock dividend requirement (1) |  |  | 7 |  |  | 7 |
| **Income Available for Common Stock** |  |  | **$471** |  |  | **$559** |

(1) These items impacted earnings for the six months ended June 30, 2014 and 2013.

### Utility Revenues and Costs that Impact Earnings

The following discussion presents the Utility’s operating results for the three and six months ended June 30, 2014 and 2013, focusing on revenues and expenses that had an impact on earnings for these periods.

#### Operating Revenues

The Utility’s electric and natural gas operating revenues that impacted earnings increased by $44 million, or 2%, and by $74 million, or 2%, in the three and six months ended June 30, 2014, respectively, compared to the same periods in 2013, primarily due to increases in revenues authorized by the FERC in the electric transmission rate case and revenues the CPUC authorized the Utility to collect for recovery of certain PSEP-related costs, as well as other higher gas transmission revenues resulting from additional demand for gas-fired generation (see "Cost of Electricity" below). The increase for both periods was partially offset by $25 million of revenue authorized by the CPUC in 2013 for recovery of the Utility’s incremental costs of responding to storms and wildfires from 2009 to 2011, with no similar activity in 2014.

In June 2014, a proposed decision was issued in the Utility’s 2014 GRC that recommends an increase in revenue requirements of $453 million, or 6.8%, over currently authorized amounts. Upon receipt of a final decision, the Utility has been authorized to collect any final adopted increase in revenue requirements from January 1, 2014. The Utility has not recorded any revenues associated with the GRC proposed decision in the three and six months ended June 30, 2014. See “Regulatory Matters” below.

#### Operating and Maintenance

The Utility’s operating and maintenance expenses that impacted earnings increased by $114 million, or 13%, and by $127 million, or 7%, in the three and six months ended June 30, 2014, respectively, compared to the same periods in 2013. The increases are primarily due to higher unrecovered costs of $68 million and $46 million, respectively, incurred in connection with natural gas matters (see table below). The remaining increases consisted of benefit-related expenses and other expenses.

The following table provides a summary of the Utility’s costs associated with natural gas matters that are not recoverable through rates:

*(in millions)*

|  | Three Months Ended June 30, 2014 | 2013 | Six Months Ended June 30, 2014 | 2013 |
| --- | ---: | ---: | ---: | ---: |
| Pipeline-related expenses (1) | $97 | $74 | $137 | $136 |
| Insurance recoveries | - | (45) | - | (45) |
| **Total natural gas matters** | **$97** | **$29** | **$137** | **$91** |

(1) Includes $58 million for work performed under the PSEP and $64 million for other gas safety-related work for the six months ended June 30, 2014. See “Natural Gas Matters” below.

There were no additional charges recorded in the three and six months ended June 30, 2014 and 2013, respectively, related to natural gas matters for disallowed capital, fines, or third-party claims. As described in “Key Factors Affecting Financial Results” above, the Utility forecasts that its total unrecoverable pipeline-related expenses in 2014 will range from $350 million to $450 million. See “Natural Gas Matters” below.

#### Depreciation, Amortization, and Decommissioning

The Utility’s depreciation, amortization, and decommissioning expenses increased by $40 million, or 8%, and by $75 million, or 7%, in the three and six months ended June 30, 2014, respectively, compared to the same periods in 2013, primarily due to the impact of capital additions.

#### Interest Income, Interest Expense, and Other Income, Net

There were no material changes to interest income, interest expense, and other income, net for the periods presented.

#### Income Tax Provision

The Utility’s income tax provision decreased by $50 million, or 31%, and by $71 million, or 25%, in the three and six months ended June 30, 2014 compared to the same periods in 2013. The effective tax rates were 31% and 33% in the three and six months ended June 30, 2014 and 2013, respectively. The decrease in effective tax rates for both periods was primarily due to higher deductible software development costs in 2014.

### Utility Revenues and Costs that do not Impact Earnings

#### Cost of Electricity

The Utility’s cost of electricity includes the costs of power purchased from third parties, transmission, fuel used in its own generation facilities, fuel supplied to other facilities under power purchase agreements, and realized gains and losses on price risk management activities. (See Note 7 of the Notes to the Condensed Consolidated Financial Statements.) The volume of power purchased by the Utility is driven by customer demand, the availability of the Utility’s own generation facilities, and the cost effectiveness of each source of electricity. Additionally, the cost of electricity is impacted by the higher cost of procuring renewable energy as the Utility increases the amount of its renewable energy deliveries to comply with California legislative and regulatory requirements, and by costs associated with complying with California’s GHG laws.

*(in millions)*

|  | Three Months Ended June 30, 2014 | 2013 | Six Months Ended June 30, 2014 | 2013 |
| --- | ---: | ---: | ---: | ---: |
| Cost of purchased power | $1,287 | $1,120 | $2,399 | $2,030 |
| Fuel used in own generation facilities | 62 | 69 | 160 | 142 |
| **Total cost of electricity** | **$1,349** | **$1,189** | **$2,559** | **$2,172** |
| Average cost of purchased power per kWh (1) | $0.097 | $0.088 | $0.093 | $0.086 |
| Total purchased power (in millions of kWh) | **13,320** | **12,788** | **25,788** | **23,674** |
| (1) Kilowatt-hour |  |  |  |  |

36

The Utility’s cost of electricity for 2014 is expected to continue to be higher due to the low levels of hydroelectric generation caused by the drought in California and higher market prices for natural gas used to fuel conventional generation resources. The Utility expects that it will be able to continue to recover the increasing cost of electricity through rates. If the Utility’s forecasted aggregate over-collections or under-collections of its electricity procurement costs exceed five percent of its prior year electricity procurement revenues, the CPUC may authorize an adjustment to retail electricity generation rates before the next annual update, which is January 1, 2015.

#### Cost of Gas

The Utility’s cost of natural gas includes the costs of procurement, storage, transportation of natural gas and realized gains and losses on price risk management activities. (See Note 7 of the Notes to the Condensed Consolidated Financial Statements.) The Utility’s cost of natural gas is impacted by the market price of natural gas, changes in the cost of storage and transportation, changes in customer demand, and by costs associated with complying with California’s GHG laws.

*(in millions)*

|  | Three Months Ended June 30, 2014 | 2013 | Six Months Ended June 30, 2014 | 2013 |
| --- | ---: | ---: | ---: | ---: |
| Cost of natural gas sold | $165 | $137 | $489 | $437 |
| Transportation cost of natural gas sold | 35 | 42 | 71 | 88 |
| **Total cost of natural gas** | **$200** | **$179** | **$560** | **$525** |
| Average cost per Mcf (1) of natural gas sold | $4.34 | $3.43 | $4.22 | $3.08 |
| Total natural gas sold (in millions of Mcf) | **38** | **40** | **116** | **142** |
| (1) One thousand cubic feet |  |  |  |  |

#### Operating and Maintenance Expenses

The Utility’s operating expenses also include certain recoverable costs that the Utility incurs as part of its operations such as public purpose programs, pension, and other recurring expenses. If the Utility were to spend over authorized amounts, these expenses could have an impact to earnings.

### LIQUIDITY AND FINANCIAL RESOURCES

### Overview

The Utility’s ability to fund operations and make distributions to PG&E Corporation depends on the levels of its operating cash flows and access to the capital and credit markets. The Utility generally utilizes equity contributions from PG&E Corporation and long-term senior unsecured debt issuances to maintain its CPUC-authorized capital structure consisting of 52% equity and 48% debt and preferred stock. The Utility relies on short-term debt, including commercial paper, to fund temporary financing needs. The CPUC authorizes the aggregate amount of long-term debt and short-term debt that the Utility may issue and authorizes the Utility to recover its related debt financing costs.

The Utility’s future equity needs will continue to be affected by costs that are not recoverable through rates, including costs related to natural gas matters, and will also be affected by various other factors described in “Operating Activities” below. The Utility’s equity needs would also increase to the extent it is required to pay fines or penalties in connection with the CPUC’s pending investigations and other enforcement matters related to its natural gas operations. (See “Natural Gas Matters” below.) Further, given the Utility’s significant ongoing capital expenditures, the Utility will continue to need equity contributions from PG&E Corporation to maintain its authorized capital structure.

PG&E Corporation’s ability to fund operations, make scheduled principal and interest payments, fund equity contributions to the Utility, and pay dividends, primarily depends on the level of cash distributions received from the Utility and PG&E Corporation’s access to the capital and credit markets. PG&E Corporation’s equity contributions to the Utility are funded primarily through common stock issuances. These contributions have been dilutive to PG&E Corporation’s EPS to the extent that the equity contributions are used by the Utility to restore equity that has been depleted by unrecoverable costs and charges. Future issuances of common stock by PG&E Corporation to fund equity contributions could have a material dilutive effect on EPS depending upon the ultimate outcomes of the CPUC’s pending investigations, the criminal proceeding and other enforcement matters, as well as the extent to which the Utility incurs costs that are not recoverable through rates.

### 2014 Financings

In February 2014, PG&E Corporation issued $350 million principal amount of 2.40% Senior Notes due March 1, 2019. The proceeds were used to repay the 5.75% Senior Notes, in the principal outstanding amount of $350 million. PG&E Corporation also entered into a new equity distribution agreement in February 2014 providing for the sale of its common stock having an aggregate gross sales price of up to $500 million.

PG&E Corporation issued common stock in the following transactions:

- During the six months ended June 30, 2014, 4 million shares were issued for cash proceeds of $160 million under the PG&E Corporation 401(k) plan, the Dividend Reinvestment and Stock Purchase Plan, and share-based compensation plans; and
- During the three and six months ended June 30, 2014, PG&E Corporation sold 5 and 10 million shares under the February 2014 equity distribution agreement for cash proceeds of $206 and $429 million, net of commissions paid of $2 and $4 million, respectively.

The proceeds from these sales were used for general corporate purposes, including the infusion of equity into the Utility. For the six months ended June 30, 2014, PG&E Corporation made equity contributions to the Utility of $580 million. On July 30, 2014, PG&E Corporation made an equity contribution to the Utility of $125 million. PG&E Corporation forecasts that it will need to continue to issue additional common stock to fund the Utility’s equity needs.

### Utility

In February 2014, the Utility issued $450 million principal amount of 3.75% Senior Notes due February 15, 2024 and $450 million principal amount of 4.75% Senior Notes due February 15, 2044. The proceeds were used to repay the 4.80% Senior Notes, in the principal outstanding amount of $539 million, to fund capital expenditures, and for general corporate purposes. In addition, in May 2014, the Utility issued $300 million principal amount of Floating Rate Senior Notes due May 11, 2015. The proceeds were used for general corporate purposes, including the repayment of a portion of outstanding commercial paper.

### Revolving Credit Facilities and Commercial Paper Program

In April 2014, PG&E Corporation and the Utility each extended the termination dates of their existing revolving credit facilities by one year from April 1, 2018 to April 1, 2019. PG&E Corporation and the Utility can issue commercial paper up to the maximum amounts of $300 million and $1.75 billion, respectively. PG&E Corporation and the Utility treat the amount of outstanding commercial paper as a reduction to the amount available under their respective revolving credit facilities.

The following table summarizes PG&E Corporation’s and the Utility’s outstanding borrowings at June 30, 2014:

*(in millions)*

|  | Termination Date | Facility Limit |  | Letters of Credit Outstanding | Borrowings | Commercial Paper | Facility Availability |
| --- | --- | ---: | ---: | ---: | ---: | ---: | ---: |
| PG&E Corporation | April 2019 | $300 | (1) | $- | $- | $112 | $188 |
| Utility | April 2019 | 3,000 | (2) | 86 | - | 1,041 | 1,873 |
| **Total revolving** |  |  |  |  |  |  |  |
| **credit facilities** |  | **$3,300** |  | **$86** | **$-** | **$1,153** | **$2,061** |

(1) Includes a $100 million sublimit for letters of credit and a $100 million commitment for loans that are made available on a same-day basis and are repayable in full within 7 days.

(2) Includes a $1.0 billion sublimit for letters of credit and a $300 million commitment for loans that are made available on a same-day basis and are repayable in full within 7 days.

For the six months ended June 30, 2014, the average outstanding borrowings under PG&E Corporation’s revolving credit facility were $54 million and the maximum outstanding balance was $260 million. In February 2014, PG&E Corporation repaid the full outstanding borrowings of $260 million and initiated borrowing under its commercial paper program established in January 2014. For the six months ended June 30, 2014, PG&E Corporation’s average outstanding commercial paper balance was $138 million and the maximum outstanding balance during the period was $260 million.

For the six months ended June 30, 2014, the Utility’s average outstanding commercial paper balance was $957 million and the maximum outstanding balance during the period was $1.4 billion. The Utility has not borrowed under its credit facility during 2014.

At June 30, 2014, PG&E Corporation and the Utility were in compliance with all covenants under their respective revolving credit facilities.

### Dividends

In June 2014, the Board of Directors of PG&E Corporation declared quarterly dividends of $0.455 per share, totaling $215 million, of which approximately $210 million was paid on July 15, 2014 to shareholders of record on June 30, 2014.

In June 2014, the Board of Directors of the Utility declared a common stock dividend of $179 million that was paid to PG&E Corporation on June 19, 2014.

In June 2014, the Board of Directors of the Utility declared dividends on its outstanding series of preferred stock, payable on August 15, 2014, to shareholders of record on July 31, 2014.

### Utility

### Operating Activities

The Utility’s cash flows from operating activities primarily consist of receipts from customers less payments of operating expenses, other than expenses such as depreciation that do not require the use of cash.

The Utility’s cash flows from operating activities for the six months ended June 30, 2014 and 2013 were as follows:

*(in millions)*

|  | Six Months Ended June 30, 2014 | 2013 |
| --- | ---: | ---: |
| Net income | $478 | $566 |
| Adjustments to reconcile net income to net cash provided by operating |  |  |
| activities: |  |  |
| Depreciation, amortization, and decommissioning | 1,094 | 1,019 |
| Allowance for equity funds used during construction | (46) | (52) |
| Deferred income taxes and tax credits, net | 18 | 337 |
| Other | 108 | 126 |
| Net effect of changes in operating assets and liabilities | (391) | (532) |
| **Net cash provided by operating activities** | **$1,261** | **$1,464** |

During the six months ended June 30, 2014, net cash provided by operating activities decreased by $203 million compared to the same period in 2013. This decrease consisted of various fluctuations in cash flows including higher purchased power costs and natural gas costs during 2014 as compared to 2013.

Future cash flow from operating activities will be affected by various factors, including:

- the timing and outcome of ratemaking proceedings, including the 2014 GRC and 2015 GT&S rate cases;
- the timing and amount of tax payments, tax refunds, net collateral payments, and interest payments;
- the timing and amount of insurance recoveries related to third-party claims (see “Natural Gas Matters” below);
- the timing and amount of fines or penalties that may be imposed, as well as any costs associated with remedial actions the Utility may be required to implement (see “Natural Gas Matters” below);
- the timing and amount of costs the Utility incurs, but does not recover, to improve the safety and reliability of its natural gas system (see “Operating and Maintenance” above and “Natural Gas Matters” below); and
- the timing of the resolution of the Chapter 11 disputed claims and the amount of interest on these claims that the Utility will be required to pay (see Note 9 of the Notes to the Condensed Consolidated Financial Statements).

39

### Investing Activities

The Utility’s investing activities primarily consist of construction of new and replacement facilities necessary to provide safe and reliable electricity and natural gas services to its customers. Cash used in investing activities also includes the proceeds from sales of nuclear decommissioning trust investments which are largely offset by the amount of cash used to purchase new nuclear decommissioning trust investments. The funds in the decommissioning trusts, along with accumulated earnings, are used exclusively for decommissioning and dismantling the Utility’s nuclear generation facilities.

The Utility’s cash flows from investing activities for the six months ended June 30, 2014 and 2013 were as follows:

*(in millions)*

|  | Six Months Ended June 30, 2014 | 2013 |
| --- | ---: | ---: |
| Capital expenditures | $(2,320) | $(2,521) |
| Decrease in restricted cash | 2 | 25 |
| Proceeds from sales and maturities of nuclear decommissioning trust investments | 877 | 795 |
| Purchases of nuclear decommissioning trust investments | (873) | (786) |
| Other | 17 | 8 |
| **Net cash used in investing activities** | **$(2,297)** | **$(2,479)** |

Net cash used in investing activities decreased by $182 million during the six months ended June 30, 2014 compared to the same period in 2013 primarily due to lower capital expenditures.

Future cash flows used in investing activities are largely dependent on the timing and amount of capital expenditures. The Utility estimates that it will incur between $5 billion and $6 billion in capital expenditures for 2014, including PSEP-related expenditures.

### Financing Activities

The Utility’s cash flows from financing activities for the six months ended June 30, 2014 and 2013 were as follows:

*(in millions)*

|  | Six Months Ended June 30, 2014 | 2013 |
| --- | ---: | ---: |
| Net issuances of commercial paper, net of discount of $1 at respective dates | $125 | $321 |
| Proceeds from issuance of short-term debt, net of issuance costs | 300 | - |
| Proceeds from issuance of long-term debt, net of premium, discount, and issuance |  |  |
| costs of $11 and $8 at respective dates | 889 | 742 |
| Repayments of long-term debt | (539) | (461) |
| Preferred stock dividends paid | (7) | (7) |
| Common stock dividends paid | (358) | (358) |
| Equity contribution | 580 | 665 |
| Other | 51 | (20) |
| **Net cash provided by financing activities** | **$1,041** | **$882** |

During the six months ended June 30, 2014, net cash provided by financing activities increased by $159 million compared to the same period in 2013. Cash provided by or used in financing activities is driven by the Utility’s financing needs, which depend on the level of cash provided by or used in operating activities, the level of cash provided by or used in investing activities, the conditions in the capital markets, and the maturity date of existing debt instruments. The Utility generally utilizes long-term debt issuances and equity contributions from PG&E Corporation to maintain its CPUC-authorized capital structure, and relies on commercial paper and other short-term debt to fund temporary financing needs.

### NATURAL GAS MATTERS

Since the San Bruno accident occurred on September 9, 2010, PG&E Corporation and the Utility have incurred total cumulative charges of approximately $2.6 billion related to natural gas matters that are not recoverable through rates, as shown in the following table:

*(in millions)*

|  | Cumulative December 31, 2013 | Six Months Ended June 30, 2014 | Cumulative June 30, 2014 |
| --- | ---: | ---: | ---: |
| Pipeline-related expenses (1) | $1,410 | $137 | $1,547 |
| Disallowed capital (2) | 549 | - | 549 |
| Accrued fines (3) | 239 | - | 239 |
| Third-party liability claims (4) | 565 | - | 565 |
| Insurance recoveries (4) | (354) | - | (354) |
| Contribution to City of San Bruno | 70 | - | 70 |
| **Total natural gas matters** | **$2,479** | **$137** | **$2,616** |

(1) Cumulative costs through June 30, 2014 included PSEP expenses of approximately $794 million and other gas safety-related work of $411 million. The Utility forecasts that it will incur total unrecovered pipeline-related expenses ranging from $350 million to $450 million in 2014.

(2) See “Pipeline Safety Enhancement Plan” below.

(3) See “Pending CPUC Investigations” below.

(4) See “Third-Party Liability Claims” below.

### Pending CPUC Investigations

As described in the 2013 Annual Report, there are three CPUC investigative enforcement proceedings pending against the Utility related to its natural gas operations and the San Bruno accident. The ALJs who are presiding over the investigations are expected to issue one or more decisions to address the violations that they have determined the Utility committed and to impose penalties. It is uncertain when these decisions will be issued. In July 2013, the SED recommended that the CPUC impose what the SED characterizes as a penalty of $2.25 billion on the Utility, allocated as follows: (1) $300 million as a fine payable to the State General Fund, (2) $435 million for a portion of costs related to the Utility’s PSEP that were previously disallowed by the CPUC and funded by shareholders, and (3) $1.5 billion to perform PSEP work that was previously approved by the CPUC, implement operational remedies, and for future costs. Other parties, including the City of San Bruno, TURN, the CPUC’s ORA, and the City and County of San Francisco, have recommended total penalties of at least $2.25 billion, including fines payable to the State General Fund of differing amounts.

Aside from any penalty resulting from the CPUC’s investigations, the Utility estimates that its total unrecovered costs for gas pipeline safety-related work incurred or committed over the next several years will be approximately $2.7 billion, including cumulative charges reflected in the table above for unrecovered PSEP expenses and capital costs and other gas safety-related work (see “pipeline-related expenses” and “disallowed capital”). If the SED’s penalty recommendation is adopted by the CPUC, the Utility estimates that its total unrecovered costs related to natural gas transmission operations would be about $4.5 billion, including: (1) the approximately $2.7 billion discussed in the preceding sentence; (2) a fine of $300 million; and (3) $1.5 billion to perform incremental shareholder-funded gas safety work.

Based on the CPUC’s rules, after the ALJs issue their decisions, the Utility and other parties would have 30 days to file an appeal. Parties would have 15 days to respond to appeals. In addition, within 30 days after the decisions are issued, a CPUC commissioner could request that the CPUC review the decisions. If appeals are filed or a CPUC commissioner requests a review, it is uncertain when the final outcome of these investigations would be determined.

At June 30, 2014, the Condensed Consolidated Balance Sheets included an accrual of $200 million in other current liabilities for the minimum amount of fines deemed probable that the Utility will be required to pay to the State General Fund. The Utility is unable to make a better estimate due to the many variables that could affect the final outcome, including: how the total number and duration of violations will be determined; how the various penalty recommendations will be considered; how the financial and tax impact of unrecoverable costs the Utility has incurred, and will continue to incur, to improve the safety and reliability of its pipeline system, will be considered; whether the Utility’s costs to perform any required remedial actions will be considered; and how the CPUC will respond to public pressure. Future changes in these estimates or the assumptions on which they are based could have a material impact on future financial condition, results of operations, and cash flows.

The CPUC may impose fines on the Utility that are materially higher than the amount accrued and may disallow future costs, or costs that were previously authorized for recovery, including PSEP costs. Disallowed capital investments would be charged to net income in the period in which the CPUC orders such a disallowance. See “Pipeline Safety Enhancement Plan” below. Future disallowed expense and capital costs would be charged to net income in the period incurred.

On July 28, 2014, the City of San Bruno filed a motion alleging that the Utility violated CPUC rules that prohibit certain communications between “an interested person,” such as the Utility, and a “decision maker,” such as a Commissioner, regarding adjudicatory proceedings, such as the pending investigations. The City of San Bruno requested that the CPUC issue an “order to show cause” why the Utility should not be penalized for the alleged violations. The City of San Bruno also filed a motion seeking the recusal of the President of the CPUC from serving as an assigned Commissioner in the investigatory proceedings and from voting on the final decisions. Responses to the motions are due on August 12, 2014.

### Criminal Indictment

On July 30, 2014, the U.S. Attorney’s Office for the Northern District of California filed a 28-count superseding criminal indictment against the Utility in federal district court replacing the indictment that had been filed on April 1, 2014. The superseding indictment alleges 27 felony counts (increased from 12 counts alleged in the original indictment) charging that the Utility knowingly and willfully violated minimum safety standards under the Natural Gas Pipeline Safety Act relating to record keeping, pipeline integrity management, and identification of pipeline threats. The superseding indictment also includes one felony count charging that the Utility obstructed the NTSB’s investigation of the San Bruno accident in violation of a federal statute prohibiting obstruction of a federal agency’s proceedings. The maximum statutory fine for each felony count is $500,000, for total fines of $14 million. The superseding indictment also alleges a maximum alternative fine under the Alternative Fines Act which states, in part: “If any person derives pecuniary gain from the offense, or if the offense results in pecuniary loss to a person other than the defendant, the defendant may be fined not more than the greater of twice the gross gain or twice the gross loss, unless imposition of a fine under this subsection would unduly complicate or prolong the sentencing process.” Based on the superseding indictment’s allegations that the Utility derived gross gains of approximately $281 million and that victims suffered losses of approximately $565 million, the maximum alternate fine would be approximately $1.13 billion. The Utility continues to believe that criminal charges are not merited and that it did not knowingly and willfully violate minimum safety standards under the Natural Gas Pipeline Safety Act or obstruct the NTSB’s investigation, as alleged in the superseding indictment. PG&E Corporation and the Utility have not accrued any charges for criminal fines in their condensed consolidated financial statements as such amounts are not probable. The Utility will appear in court at a status conference that is scheduled to be held on August 18, 2014. See the discussion in “Item 1A. Risk Factors” below.

### Other Enforcement Matters

PG&E Corporation’s and the Utility’s financial condition, results of operations, and cash flows also may be affected by the outcome of the following matters. They are unable to reasonably estimate the amount or range of future charges that could be incurred in connection with these matters given the wide discretion the CPUC and the SED have in determining whether to bring enforcement action and the number of factors that can be considered in determining the amount of fines.

*Gas Safety Citation Program.* The SED has authority to issue citations and impose fines on California gas corporations, such as the Utility, for violations of certain state and federal regulations that relate to the safety of natural gas facilities and operating practices. The California gas corporations are required to inform the SED of any self-identified or self-corrected violations of these regulations. (California law also requires the CPUC to adopt a safety enforcement program for California electric corporations. See “Regulatory Matters” below.) The SED has discretion to impose fines or take other enforcement action to address a violation, based on the totality of the circumstances. The SED can consider various factors in determining whether to impose fines and the amount of fines, including the severity of the safety risk associated with each violation, the number and duration of the violations, whether the violation was self-reported, and whether corrective actions were taken. The SED has imposed fines ranging from $50,000 to $16.8 million in connection with several of the Utility’s self-reports.

At June 30, 2014, the Utility has submitted about 65 self-reports (plus some follow-up reports) that the SED has not yet addressed. In addition, in July 2014, the Utility reported that it discovered that, contrary to its procedures, employees who perform work to fuse plastic pipes together had completed only part of their requisite re-qualification. The Utility believes that this issue does not constitute a safety concern as every plastic pipe installed in the field is tested on site and under pressure before being put into service. The Utility suspended non-emergency plastic fusion work until employees who perform this work undergo proper re-qualifications.

The Utility believes it is probable that the SED will impose fines or take other enforcement action with respect to some of the Utility’s self-reports in the future. In addition, the SED has been conducting numerous compliance audits of the Utility’s operating practices and has informed the Utility that the SED’s audit findings include several allegations of noncompliant practices. It is reasonably possible that the SED will impose fines with respect to its audit findings. The Utility has been taking corrective actions in response to these matters.

*Natural Gas Transmission Pipeline Rights-of-Way.* In 2012, the Utility notified the CPUC and the SED that the Utility planned to complete a system-wide survey of its transmission pipelines in an effort to identify encroachments (such as building structures and vegetation overgrowth) on the Utility’s pipeline rights-of-way. The Utility also submitted a proposed compliance plan that set forth the scope and timing of remedial work to remove identified encroachments over a multi-year period and to pay penalties if the proposed milestones were not met. In March 2014, the Utility informed the SED that the survey has been completed and that remediation work, including removal of the encroachments, is expected to continue for several years. The SED has not addressed the Utility’s proposed compliance plan, and it is reasonably possible that the SED will impose fines on the Utility or take other enforcement action in the future based on the Utility’s failure to continuously survey its system and remove encroachments.

*Other Matters.* On March 3, 2014, a vacant house in Carmel, California was severely damaged due to a natural gas explosion while the Utility’s employees were performing work to upgrade the main natural gas distribution pipeline in the area. There were no injuries or fatalities. A third-party engineering firm hired by the Utility determined that the root cause of the incident was “inadequate verification of system status and configuration when performing work on a live line.” The Utility is implementing the recommendations made by the consultant. The CPUC, the U.S. Attorney’s Office, and local Carmel officials are continuing to investigate the incident. It is reasonably possible that fines could be imposed on the Utility, or that other enforcement actions could be taken, in connection with this matter.

### Pipeline Safety Enhancement Plan

On July 25, 2014, the Utility, together with the CPUC’s ORA and TURN, requested that the CPUC approve a settlement agreement to resolve the Utility’s PSEP Update application (submitted in October 2013). The settlement agreement proposes that the CPUC approve total PSEP-related revenue requirements (2012-2014) that reflect a $23 million reduction to expense funding, as compared to the Utility’s request. For the three months ended June 30, 2014, the Utility recorded a charge against operating revenue to reflect the cumulative impact of this reduction. The settlement agreement does not propose any reductions to total PSEP capital costs of $766 million requested by the Utility in the PSEP Update application. The Utility previously has recorded cumulative charges of $549 million for PSEP-related capital costs that are expected to exceed the amount to be recovered. At June 30, 2014, approximately $400 million of PSEP-related capital costs is recorded in property, plant, and equipment on the Condensed Consolidated Balance Sheets. The Utility would be required to record charges in future periods to the extent PSEP-related capital costs are higher than currently expected and to the extent the CPUC authorizes total capital costs that are lower than $766 million. The parties have requested the CPUC’s approval of the settlement agreement by December 1, 2014. The Utility’s ability to recover PSEP-related costs also could be affected by the final decisions to be issued in the CPUC’s pending investigations discussed above.

### Third-Party Liability Claims

The Utility has recorded cumulative charges of $565 million as its best estimate of probable loss for third-party claims related to the San Bruno accident. The Utility has settled substantially all third-party claims. Since the San Bruno accident, the Utility has made cumulative settlement payments of $532 million through June 30, 2014. In addition, the Utility has incurred cumulative expenses of $88 million for associated legal costs. The Utility has recognized cumulative insurance recoveries of $354 million for third-party claims and associated legal costs. The Utility believes it will recover a significant portion of its remaining costs through insurance, although the amount and timing of additional insurance recoveries are uncertain. The Utility has been engaged in settlement negotiations with its insurers regarding recovery of its remaining claims and costs.

### Class Action Complaint

In August 2012, a complaint was filed in the San Francisco Superior Court against PG&E Corporation and the Utility (and other unnamed defendants) by individuals who seek certification of a class consisting of all California residents who were customers of the Utility between 1997 and 2010, with certain exceptions. The plaintiffs allege that the Utility collected more than $100 million in customer rates from 1997 through 2010 for the purpose of various safety measures and operations projects but instead used the funds for general corporate purposes such as executive compensation and bonuses. The plaintiffs allege that PG&E Corporation and the Utility engaged in unfair business practices in violation of California state law. The plaintiffs seek restitution and disgorgement, as well as compensatory and punitive damages. PG&E Corporation and the Utility contest the plaintiffs’ allegations. In May 2013, the court granted PG&E Corporation’s and the Utility’s request to dismiss the complaint on the grounds that the CPUC has exclusive jurisdiction to adjudicate the issues raised by the plaintiffs’ allegations. The plaintiffs have appealed the court’s ruling to the California Court of Appeal. PG&E Corporation and the Utility are unable to estimate the amount or range of reasonably possible losses, if any, that may be incurred in connection with this matter if the lower court’s ruling is reversed.

### Other Pending Lawsuits and Claims

At June 30, 2014, there were also five purported shareholder derivative lawsuits outstanding against PG&E Corporation and the Utility seeking recovery on behalf of PG&E Corporation and the Utility for alleged breaches of fiduciary duty by officers and directors, among other claims. The plaintiffs for four of these lawsuits filed a consolidated complaint with the San Mateo County Superior Court. Although the proceedings were stayed, the state court permitted the plaintiffs to amend the consolidated complaint to discuss recent events, including the federal criminal indictment discussed above. The plaintiffs in the consolidated state court lawsuits have requested that the judge lift the stay and allow the litigation to resume and PG&E Corporation, the Utility, and the individual defendants have requested that the judge continue the stay while the criminal proceeding is pending. On July 25, 2014, the judge issued a tentative ruling to lift the stay. At a hearing held on July 28, 2014, the judge stated that he would issue his final ruling on August 1, 2014. PG&E Corporation, the Utility, and the individual defendants have reserved their right to challenge all of the allegations in the amended complaint if the stay is lifted. The purported shareholder derivative lawsuit that was filed in the U.S. District Court for the Northern District of California remains stayed.

In February 2011, the Board of Directors of PG&E Corporation authorized PG&E Corporation to reject a demand made by another shareholder that the Board of Directors (1) institute an independent investigation of the San Bruno accident and related alleged safety issues; (2) seek recovery of all costs associated with such issues through legal proceedings against those determined to be responsible, including Board of Directors members, officers, other employees, and third parties; and (3) adopt corporate governance initiatives and safety programs. The Board of Directors also reserved the right to commence further investigation or litigation regarding the San Bruno accident if the Board of Directors deems such investigation or litigation appropriate.

PG&E Corporation and the Utility are uncertain when and how the above lawsuits will be resolved.

### REGULATORY MATTERS

The Utility is subject to substantial regulation by the CPUC, the FERC, the NRC and other federal and state regulatory agencies. Significant regulatory developments that have occurred since the 2013 Annual Report was filed with the SEC are discussed below.

### 2014 General Rate Case

In the GRC, the CPUC will determine the revenue requirements that the Utility is authorized to collect through rates from 2014 through 2016 to recover anticipated costs associated with its electric and natural gas distribution operations and electric generation operations. The revenue requirements requested by the Utility were based on the Utility’s detailed expense and capital forecasts developed using operational plans that incorporate risk assessments and mitigation measures to address safety and security issues. The Utility also made various assumptions to develop these forecasts, including assumptions about depreciation methods and rates, cost escalation rates, and flow-through treatment of certain federal tax benefits.

On June 18, 2014, a proposed decision was issued that recommends an increase in 2014 revenue requirements of $453 million, or 6.8% over currently authorized amounts, compared to the $1,160 million, or 17.5%, increase requested by the Utility. The proposed decision recommends a total authorized revenue requirement of $7.1 billion for 2014 compared to the Utility’s $7.8 billion request. The proposed decision recommends attrition increases of $322 million for 2015 and $371 million for 2016, compared to the Utility’s requested attrition increases, as adjusted, of $436 million for 2015 and $486 million for 2016. The following table shows the differences between the Utility’s requested increases in 2014 revenue requirements and the recommended amounts by line of business:

*(in millions)*

| Line of business | Proposed Decision | Requested by the Utility | Difference |
| --- | ---: | ---: | ---: |
| Electric distribution | $127 | $514 | $(387) |
| Gas distribution | 242 | 446 | (204) |
| Electric generation | 84 | 200 | (116) |
| **Total revenue increase** | **$453** | **$1,160** | **$(707)** |

Compared to the Utility’s 2014 request, the proposed decision recommends reductions in funding for various safety, reliability, and customer service improvements across various parts of the business. The proposed decision recommends a depreciation rate-related expense increase of approximately $157 million as compared to the $492 million increase supported by the Utility’s depreciation rate study. The Utility’s analysis of the proposed decision also indicates that, if approved, the Utility’s 2014 capital expenditures would be reduced from the $3.9 billion requested to approximately $3.5 billion. The proposed decision recommends authorizing a 2014 weighted average rate base of $20.5 billion as compared to the Utility’s request of $21.0 billion, which reflects a reduction of approximately $400 million to exclude nuclear fuel inventory from rate base.

The proposed decision agrees with the Utility’s request for new two-way balancing accounts to allow the Utility to recover costs associated with gas leak survey and repair, major emergencies, and certain new regulatory requirements related to nuclear operations and hydroelectric relicensing.

In July 2014, several parties, including the Utility, the CPUC’s ORA, and TURN, submitted comments on the proposed decision. The CPUC may issue a final decision at its meeting on August 14, 2014. Upon receipt of a final decision, the Utility has been authorized to collect any final adopted increase in revenue requirements from January 1, 2014. PG&E Corporation’s and the Utility’s financial condition, results of operations, and cash flows could be materially affected if the Utility’s actual costs differ from the amounts authorized in the final GRC decision.

### 2015 Gas Transmission and Storage Rate Case

As disclosed in the 2013 Annual Report, the Utility has requested that the CPUC approve an annual revenue requirement of $1.29 billion for 2015 for the Utility’s anticipated costs of providing natural gas transmission and storage services, with attrition increases of $61 million in 2016 and $168 million in 2017. The CPUC has authorized the Utility’s revenue requirement changes to become effective as of January 1, 2015, even if the final decision is issued after that date. The CPUC’s current procedural schedule contemplates intervenor testimony to be submitted in August 2014, followed by evidentiary hearings to be held in October 2014, and a final decision to be issued in approximately March 2015.

The Utility has not requested authorization to recover approximately $150 million of costs it forecasts it will incur over the three-year period to pressure test pipelines placed into service after 1961 and perform remedial work associated with the Utility’s pipeline corrosion control program. The Utility also has not requested authorization to recover costs it forecasts it will incur through 2017 to identify and remove encroachments from its gas transmission pipeline rights-of-way.

The Utility’s continued use of regulatory accounting under GAAP (which enables it to account for the effects of regulation, including recording regulatory assets and liabilities) for gas transmission and storage service depends on its ability to recover its cost of service. If the Utility were unable to continue using regulatory accounting under GAAP, there would be differences in the timing of expense (or gain) recognition that could materially affect PG&E Corporation’s and the Utility’s future financial results.

### FERC Transmission Owner Rate Cases

The Utility has two transmission owner rate cases pending at the FERC. With respect to the rate case that was filed in July 2013, the Utility, the FERC Trial Staff and all active intervening parties reached a settlement that was submitted to the FERC for approval in July 2014. The settlement, if approved, will increase the annual retail revenue requirement from $1,017 million to approximately $1,040 million, effective as of October 1, 2013. The Utility has been collecting revenues at the higher as-filed rates requested in the Utility’s application. In future periods, the Utility will refund to customers the difference between revenues collected at the higher as-filed rates and the rates approved in the settlement. It is uncertain when the FERC will act on the settlement.

On July 30, 2014, the Utility filed an application with the FERC to request authorization of its proposed 2015 retail electric transmission revenue requirement of $1,366 million, a $326 million increase to the revenue requirements, if approved, described in the preceding paragraph. The Utility’s 2015 cost forecasts reflect the continuing need to replace and modernize aging electric transmission infrastructure, to meet the need for increased capacity in the CAISO controlled grid, and to comply with new rules aimed at ensuring the physical and cyber security of the nation’s electric system. The Utility forecasts that it will make investments of $975 million in 2014 and $1,125 million in 2015 in various capital projects. The proposed rate base in 2015 is forecast to be $5.12 billion compared to $4.57 billion in 2014. The Utility has requested that the FERC approve a 11.26% ROE. The Utility has requested the FERC to issue an order by September 2014 to accept the application and make the new rates effective on October 1, 2014, subject to refund pending a final decision by the FERC. It is anticipated that the rates will be suspended for five months and made effective on March 1, 2015, subject to refund.

### Oakley Generation Facility

In December 2012, the CPUC approved an amended purchase and sale agreement between the Utility and a third-party developer that provides for the construction of a 586-megawatt natural gas-fired facility in Oakley, California. The CPUC authorized the Utility to recover the purchase price through rates. The CPUC’s denial of various applications for rehearing that had been filed with respect to its decision was appealed to the California Court of Appeal. In February 2014, the California Court of Appeal issued a ruling that annulled the CPUC's decision after the court determined that the evidence presented did not support a finding of need for the Oakley facility. The Utility is considering its options.

### Diablo Canyon Power Plant

The Utility filed an application with the NRC in 2009 to renew the operating licenses for the two operating units at Diablo Canyon. (The current licenses expire in 2024 and 2025.) In May 2011, after an earthquake and resulting tsunami that caused significant damage to the Fukushima-Dai-ichi nuclear facilities in Japan, the NRC granted the Utility’s request to delay processing the Utility’s application while certain advanced seismic studies were completed by the Utility. The Utility is currently assessing the data from recently completed advanced seismic studies along with other available seismic data and expects to provide its final seismic report to the NRC and the CPUC’s Independent Peer Review Panel in the third quarter of 2014. (See the “2013 Annual Report” for additional information.)

### Safety Enforcement Programs

On May 21, 2014, the CPUC began a rulemaking proceeding to implement a new electric safety citation program that would authorize CPUC staff to issue citations for safety violations and assess fines. California law enacted in 2013 requires the CPUC to implement a safety enforcement program for gas corporations by July 1, 2014 and for electric corporations by January 1, 2015. The rulemaking noted that the CPUC’s current gas safety enforcement program appears to satisfy the law’s requirements. (See “Natural Gas Matters – Other Enforcement Matters” above about the reports the Utility has filed to notify the CPUC staff of noncompliance with certain gas safety regulations.) As part of the rulemaking proceeding, the CPUC may modify the gas program and determine the timing and process for considering future modifications of the citation programs. The CPUC has indicated that it plans to implement an electric safety citation program before the end of 2014 and that it plans to decide which safety violations electric corporations will be required to self-report. Depending on the number and severity of reported violations, the Utility could be required to pay fines that, individually or in the aggregate, could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, and cash flows.

### Electricity Rate Reform

New state legislation that became effective on January 1, 2014 (AB 327) repealed prior law that restricted the CPUC’s ability to change residential electric rates, granting the CPUC authority to approve fixed charges to be collected from residential customers. In 2012, the CPUC began a rulemaking to examine residential rate design in California that, consistent with AB 327, allows the CPUC to simplify the rate structure and bring rates closer to actual costs. In February 2014, as ordered by the CPUC, the Utility submitted a long-term rate reform plan that proposes a fixed customer charge, gradual flattening of the tiered rate structure, and an optional time-of-use rate. The CPUC is expected to issue a final decision by the summer of 2015.

AB 327 also requires the CPUC to develop a new structure for net energy metering by December 31, 2015 that must be implemented no later than July 1, 2017. California’s net energy metering program currently allows customers installing renewable distributed generation to receive bill credits for power delivered to the grid at their full retail rate. Increasing levels of self-generation of electricity by customers, coupled with net metering, has increased rates and shifted costs to remaining customers. AB 327 gives the CPUC new authority to reduce the cost shift associated with renewable distributed generation under the net energy metering rules. In July 2014, the CPUC began a rulemaking proceeding to develop a successor to the existing net energy metering program to comply with the requirements of AB 327. The CPUC’s preliminary schedule contemplates a scoping memo to be issued in September 2014 and a proposed decision in the fall of 2015.

If the CPUC fails to adjust the Utility’s rate design to bring rates closer to actual costs, or to adequately address the impact of increasing net energy metering and the growth of distributed generation, there will be increasing rate pressure on remaining customers. These increasing rate pressures could, in turn, cause more customers to seek alternative energy providers or sources, further exacerbating the Utility’s risk it will not recover its costs to provide electric service.

### ENVIRONMENTAL MATTERS

The Utility’s operations are subject to extensive federal, state, and local laws and permits relating to the protection of the environment and the safety and health of the Utility’s personnel and the public. These laws and requirements relate to a broad range of the Utility’s activities, including the remediation of hazardous wastes; the reporting and reduction of carbon dioxide and other GHG emissions; the discharge of pollutants into the air, water, and soil; and the transportation, handling, storage, and disposal of spent nuclear fuel. (See “Risk Factors” in the 2013 Annual Report.)

### Natural Gas Compressor Station Sites

The Utility is legally responsible for remediating groundwater contamination caused by hexavalent chromium used in the past at the Utility’s natural gas compressor stations. The Utility is also required to take measures to abate the effects of the contamination on the environment. At June 30, 2014, $170 million and $269 million was accrued in the Condensed Consolidated Balances Sheets for estimated undiscounted remediation costs associated with the Hinkley site and the Topock site, respectively. Costs associated with the Hinkley site are not recovered through rates. (See Note 10 of the Notes to the Condensed Consolidated Financial Statements.)

### Clean Air Act

In June 2014, the EPA published draft federal regulations under section 111(d) of the Clean Air Act that are designed to reduce GHG emissions from existing fossil fuel-fired power plants by as much as 30 percent by 2030, compared with 2005 levels. As presently written, once the EPA has finalized regulations, all states will have one year to prepare, adopt, and submit to the EPA an implementation plan addressing how each state will control GHG emissions from existing power plants. The EPA is expected to issue final regulations by June 2015. It is uncertain whether and how these federal regulations would ultimately impact existing California state regulation, which currently requires, among other things, the gradual reduction of state-wide GHG emissions to the 1990 level by 2020. (As disclosed in the 2013 Annual Report, the Utility expects all costs and revenues associated with the state-wide, comprehensive “cap and trade” program to be passed through to customers).

### CONTRACTUAL COMMITMENTS

PG&E Corporation and the Utility enter into contractual commitments in connection with future obligations that relate to financing arrangements (such as long-term debt, preferred stock, and certain forms of regulatory financing), purchases of electricity and natural gas for customers, purchases of transportation capacity, purchases of renewable energy, and purchases of fuel and transportation to support the Utility’s generation activities. (Refer to the 2013 Annual Report and “Liquidity and Financial Resources” above.)

### OFF-BALANCE SHEET ARRANGEMENTS

PG&E Corporation and the Utility do not have any off-balance sheet arrangements that have had, or are reasonably likely to have, a current or future material effect on their financial condition, changes in financial condition, revenues or expenses, results of operations, liquidity, capital expenditures, or capital resources, other than those discussed in Note 2 of the Notes to the Condensed Consolidated Financial Statements (PG&E Corporation’s tax equity financing agreements) and Note 14 of the Notes to the Consolidated Financial Statements in the 2013 Annual Report (the Utility’s commodity purchase agreements).

### RISK MANAGEMENT ACTIVITIES

PG&E Corporation, mainly through its ownership of the Utility, and the Utility are exposed to market risk, which is the risk that changes in market conditions will adversely affect net income or cash flows. PG&E Corporation and the Utility face market risk associated with their operations; their financing arrangements; the marketplace for electricity, natural gas, electric transmission, natural gas transportation, and storage; emissions allowances and offset credits, other goods and services; and other aspects of their businesses. PG&E Corporation and the Utility categorize market risks as “price risk” and “interest rate risk.” The Utility is also exposed to “credit risk,” the risk that counterparties fail to perform their contractual obligations.

The Utility actively manages market risk through risk management programs designed to support business objectives, discourage unauthorized risk-taking, reduce commodity cost volatility, and manage cash flows. The Utility uses derivative instruments only for non-trading purposes (i.e., risk mitigation) and not for speculative purposes. The Utility’s risk management activities include the use of energy and financial instruments such as forward contracts, futures, swaps, options, and other instruments and agreements, most of which are accounted for as derivative instruments. Some contracts are accounted for as leases. These activities are discussed in detail in the 2013 Annual Report. There were no significant developments to the Utility and PG&E Corporation’s risk management activities during the six months ended June 30, 2014.

### CRITICAL ACCOUNTING POLICIES

The preparation of the Condensed Consolidated Financial Statements in accordance with U.S. GAAP involves the use of estimates and assumptions that affect the recorded amounts of assets and liabilities as of the date of the Condensed Consolidated Financial Statements and the reported amounts of revenues and expenses during the reporting period. PG&E Corporation and the Utility consider their accounting policies for regulatory assets and liabilities, loss contingencies associated with environmental remediation liabilities and legal and regulatory matters, asset retirement obligations, and pension and other postretirement benefits plans to be critical accounting policies. These policies are considered critical accounting policies due, in part, to their complexity and because their application is relevant and material to the financial position and results of operations of PG&E Corporation and the Utility, and because these policies require the use of material judgments and estimates. Actual results may differ materially from these estimates. These accounting policies and their key characteristics are discussed in detail in the 2013 Annual Report.

### ACCOUNTING STANDARDS ISSUED BUT NOT YET ADOPTED

### Revenue Recognition Standard

In May 2014, the Financial Accounting Standards Board issued Accounting Standards Update No. 2014-09, *Revenue from Contracts with Customers,* which amends existing revenue recognition guidance. The accounting standards update will be effective on January 1, 2017. PG&E Corporation and the Utility are currently evaluating the impact the guidance will have on their consolidated financial statements and related disclosures.

### CAUTIONARY LANGUAGE REGARDING FORWARD-LOOKING STATEMENTS

This report contains forward-looking statements that are necessarily subject to various risks and uncertainties. These statements reflect management’s judgment and opinions which are based on current estimates, expectations, and projections about future events and assumptions regarding these events and management's knowledge of facts as of the date of this report. These forward-looking statements relate to, among other matters, estimated losses, including penalties and fines, associated with various investigations and proceedings; forecasts of costs the Utility will incur to make safety and reliability improvements, including natural gas transmission costs that the Utility will not recover through rates; forecasts of capital expenditures; estimates and assumptions used in critical accounting policies, including those relating to regulatory assets and liabilities, environmental remediation, litigation, third-party claims, and other liabilities; and the level of future equity or debt issuances. These statements are also identified by words such as “assume,” “expect,” “intend,” “forecast,” “plan,” “project,” “believe,” “estimate,” “predict,” “anticipate,” “may,” “should,” “would,” “could,” “potential” and similar expressions. PG&E Corporation and the Utility are not able to predict all the factors that may affect future results. Some of the factors that could cause future results to differ materially from those expressed or implied by the forward-looking statements, or from historical results, include, but are not limited to:

- the timing and outcome of the pending CPUC investigations and enforcement matters related to the Utility’s natural gas system operating practices and the San Bruno accident, including the ultimate amount of fines the Utility will be required to pay to the State General Fund, the ultimate amount of costs the Utility will incur in its natural gas transmission business that it will not recover through rates, including the cost of any remedial actions the Utility may be ordered to perform;
- the timing and outcome of the federal criminal prosecution of the Utility, including the amount of any criminal fines or penalties imposed;
- whether the CPUC or a federal judge in the criminal case appoints a monitor to oversee the Utility’s natural gas operations;
- whether additional investigations are commenced relating to the Utility’s natural gas operating practices or specific incidents;
- whether PG&E Corporation and the Utility are able to repair the harm to their reputations caused by negative publicity about the San Bruno accident, the CPUC investigations, the criminal prosecution, the Utility’s self-reports of noncompliance with certain natural gas safety regulations, and the ongoing work to remove encroachments from transmission pipeline rights-of-way;
- the outcomes of ratemaking proceedings, such as the 2014 GRC, the 2015 GT&S rate case, and the transmission owner rate cases and whether the cost and revenue forecasts assumed in such outcomes prove to be accurate;
- the amount and timing of additional common stock issuances by PG&E Corporation, the proceeds of which are contributed as equity to maintain the Utility’s authorized capital structure as the Utility incurs charges and costs that it cannot recover through rates, including costs and fines associated with natural gas matters and the pending investigations;
- the outcome of future investigations, citations, or other enforcement proceedings, that may be commenced relating to the Utility’s compliance with laws, rules, regulations, or orders applicable to its operations, including the construction, expansion or replacement of its electric and gas facilities; inspection and maintenance practices, customer billing and privacy, and physical and cyber security;
- the impact of environmental remediation laws, regulations, and orders; the ultimate amount of costs incurred to discharge the Utility’s known and unknown remediation obligations; the extent to which the Utility is able to recover environmental compliance and remediation costs in rates or from other sources; and the ultimate amount of environmental remediation costs the Utility incurs but does not recover, such as the remediation costs associated with the Utility’s natural gas compressor station site located near Hinkley, California;
- the impact of new legislation or NRC regulations, recommendations, policies, decisions, or orders relating to the nuclear industry, including operations, seismic design, security, safety, relicensing, the storage of spent nuclear fuel, decommissioning, cooling water intake, or other issues; and whether the Utility decides to request that the NRC resume processing the Utility’s renewal application for the two Diablo Canyon operating licenses, and if so, whether the NRC grants the renewal;
- the impact of droughts or other weather-related conditions or events, climate change, natural disasters, acts of terrorism, war, or vandalism (including cyber-attacks), and other events, that can cause unplanned outages, reduce generating output, disrupt the Utility’s service to customers, or damage or disrupt the facilities, operations, or information technology and systems owned by the Utility, its customers, or third parties on which the Utility relies; and subject the Utility to third-party liability for property damage or personal injury, or result in the imposition of civil, criminal, or regulatory penalties on the Utility;
- the impact of environmental laws and regulations aimed at the reduction of carbon dioxide and GHGs, and whether the Utility is able to continue recovering associated compliance costs, such as the cost of emission allowances and offsets under cap-and-trade regulations and the cost of renewable energy procurement;
- changes in customer demand for electricity and natural gas resulting from unanticipated population growth or decline in the Utility’s service area; general and regional economic and financial market conditions; municipalization of the Utility’s electric or gas distribution facilities; changing levels of “direct access” customers who procure electricity from alternative energy providers; changing levels of customers who purchase electricity from governmental bodies that act as “community choice aggregators”; the development of alternative energy technologies including self-generation, storage and distributed generation technologies; and changing levels of “core gas aggregation” customers who procure gas from core transport agents (alternative gas providers);
- the supply and price of electricity, natural gas, and nuclear fuel; the extent to which the Utility can manage and respond to the volatility of energy commodity prices; the ability of the Utility and its counterparties to post or return collateral in connection with price risk management activities; and whether the Utility is able to recover timely its electric generation and energy commodity costs through rates, especially if the integration of renewable generation resources force conventional generation resource providers to curtail production, triggering “take or pay” provisions in the Utility’s power purchase agreements;
- whether the Utility’s information technology, operating systems and networks, including the advanced metering system infrastructure, customer billing, financial, and other systems, can continue to function accurately while meeting regulatory requirements; whether the Utility is able to protect its operating systems and networks from damage, disruption, or failure caused by cyber-attacks, computer viruses, or other hazards; whether the Utility’s security measures are sufficient to protect against unauthorized or inadvertent disclosure of information contained in such systems and networks; and whether the Utility can continue to rely on third-party vendors and contractors that maintain and support some of the Utility’s operating systems;
- the extent to which costs incurred in connection with third-party claims or litigation can be recovered through insurance, rates, or from other third parties; including the timing and amount of insurance recoveries related to third party claims arising from the San Bruno accident;
- the ability of PG&E Corporation and the Utility to access capital markets and other sources of debt and equity financing in a timely manner on acceptable terms;
- changes in credit ratings which could result in increased borrowing costs especially if PG&E Corporation or the Utility were to lose its investment grade credit ratings;
- the impact of federal or state laws or regulations, or their interpretation, on energy policy and the regulation of utilities and their holding companies, including how the CPUC interprets and enforces the financial and other conditions imposed on PG&E Corporation when it became the Utility’s holding company, and whether the ultimate outcomes of the matters discussed under “Natural Gas Matters” below affect the Utility’s ability to make distributions to PG&E Corporation, and, in turn, PG&E Corporation’s ability to pay dividends;
- the outcome of federal or state tax audits and the impact of any changes in federal or state tax laws, policies, regulations, or their interpretation; and
- the impact of changes in GAAP, standards, rules, or policies, including those related to regulatory accounting, and the impact of changes in their interpretation or application.

For more information about the significant risks that could affect the outcome of these forward-looking statements and PG&E Corporation’s and the Utility’s future financial condition, results of operations, and cash flows, see “Risk Factors” in the 2013 Annual Report and “Item 1A. Risk Factors” below. PG&E Corporation and the Utility do not undertake any obligation to update forward-looking statements, whether in response to new information, future events, or otherwise.

## Market risk

As filed, 606 characters.

PG&E Corporation’s and the Utility’s primary market risk results from changes in energy commodity prices. PG&E Corporation and the Utility engage in price risk management activities for non-trading purposes only. Both PG&E Corporation and the Utility may engage in these price risk management activities using forward contracts, futures, options, and swaps to hedge the impact of market fluctuations on energy commodity prices and interest rates. (See the section above entitled “Risk Management Activities” in Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations.)

## Controls and procedures

As filed, 1,561 characters.

Based on an evaluation of PG&E Corporation’s and the Utility’s disclosure controls and procedures as of June 30, 2014, PG&E Corporation’s and the Utility’s respective principal executive officers and principal financial officers have concluded that such controls and procedures were effective to ensure that information required to be disclosed by PG&E Corporation and the Utility in reports that the companies file or submit under the Securities Exchange Act of 1934 is recorded, processed, summarized, and reported within the time periods specified in the SEC rules and forms. In addition, PG&E Corporation’s and the Utility’s respective principal executive officers and principal financial officers have concluded that such controls and procedures were effective in ensuring that information required to be disclosed by PG&E Corporation and the Utility in the reports that PG&E Corporation and the Utility file or submit under the Securities Exchange Act of 1934 is accumulated and communicated to PG&E Corporation’s and the Utility’s management, including PG&E Corporation’s and the Utility’s respective principal executive officers and principal financial officers, or persons performing similar functions, as appropriate to allow timely decisions regarding required disclosure.

There were no changes in internal control over financial reporting that occurred during the quarter ended June 30, 2014 that have materially affected, or are reasonably likely to materially affect, PG&E Corporation’s or the Utility’s internal control over financial reporting.

## Risk factors

As filed, 4,647 characters.

For information about the significant risks that could affect PG&E Corporation’s and the Utility’s future financial condition, results of operations, and cash flows, see the section of the 2013 Annual Report entitled “Risk Factors,” as supplemented below, and the section of this quarterly report entitled “Cautionary Language Regarding Forward-Looking Statements.”

***PG&E Corporation’s and the Utility’s reputations have been significantly affected by the negative publicity about the federal criminal indictment of the Utility for alleged violations of the federal Pipeline Safety Act and for allegedly obstructing the NTSB’s investigation of the San Bruno accident. Their reputations could be further harmed by the eventual outcome of the pending CPUC investigations and if additional enforcement action is taken with respect to other natural gas operating practices or incidents. The outcome of these matters, including the amount of fines and penalties that may be imposed on the Utility and the ultimate amount of unrecoverable costs the Utility incurs in connection with its natural gas operations could have a material impact on PG&E Corporation’s and the Utility’s financial condition, results of operations and cash flows.***

The reputations of PG&E Corporation and the Utility have suffered as a result of the extensive media coverage of the federal criminal prosecution of the Utility and allegations that the Utility improperly communicated with the CPUC regarding the substance of the pending CPUC investigations. (See “Natural Gas Matters” above.) Media coverage of future developments in the criminal prosecution and following the issuance of the decisions in the three pending CPUC investigations may cause further reputational harm. In addition, their reputations could suffer further depending on the outcome of the other matters relating to the Utility’s natural gas operations as discussed under “Natural Gas Matters – Other Enforcement Matters” above. While the CPUC investigations remain unresolved and as personnel changes occur at the CPUC, it can become increasingly difficult to estimate how these other matters will be addressed. If events or developments occur that further harm PG&E Corporation’s and the Utility’s reputations, the additional reputational harm could have a negative influence on how these other matters are addressed. Additional reputational harm also could negatively influence the regulatory decision-making process in the Utility’s ratemaking proceedings pending at the CPUC, such as the 2014 GRC and the GT&S rate case.

Continuing negative publicity and uncertainty about the outcome of the CPUC investigations and the criminal proceeding may cause investors to question management’s ability to repair the reputational harm that PG&E Corporation and the Utility have suffered, resulting in an adverse impact on the market price of PG&E Corporation common stock. The issuance of common stock by PG&E Corporation to fund the Utility’s unrecovered costs has materially diluted PG&E Corporation’s EPS. Additional share issuances following a declining stock price would cause further dilution.

In addition to the reputational harm associated with these matters, PG&E Corporation’s and the Utility’s financial condition, results of operations, and cash flows could be materially affected by the outcome of these matters. The final decisions to be issued in the CPUC investigations may order the Utility to pay fines that materially exceed the amount previously accrued. The ultimate amount of pipeline-related costs that the Utility incurs but does not recover through rates will be affected by the final decisions in the CPUC investigations, the outcome of pending ratemaking proceedings, the extent to which the scope and timing of planned pipeline work changes, and whether actual costs exceed forecasts. In addition, if the Utility is convicted of the criminal charges in the federal prosecution and the jury finds that the criminal conduct caused a pecuniary gain or loss, a material amount of fines could be imposed on the Utility. Although the maximum statutory fine for each of the 28 counts charged in the superseding indictment is $500,000 (for a total of $14 million), the U.S. Attorney is seeking an alternative fine based on the greater of twice the gross gain the Utility allegedly derived or twice the gross loss allegedly caused. The superseding indictment alleges that the Utility derived gross gains of approximately $281 million and caused gross losses of approximately $565 million. Based on these allegations, the maximum alternative fine would be approximately $1.13 billion.

Filed Jul 31, 2014.
Source: SEC EDGAR, the filing index for accession 0001004980-14-000069. Last ingested by Listed: Nov 14, 2026, 23:58 ET. No prices; not investment advice.