## Figures reported in this filing

Standardized XBRL line items for the period ended 2016-03-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2016-01-01 to 2016-03-31 | $3.97bn | us-gaap:Revenues |
| Operating income | 3 months, 2016-01-01 to 2016-03-31 | $95.0m | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2016-01-01 to 2016-03-31 | $203.0m | us-gaap:InterestExpense |
| Income tax | 3 months, 2016-01-01 to 2016-03-31 | −$187.0m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2016-01-01 to 2016-03-31 | $110.0m | us-gaap:ProfitLoss |
| Diluted EPS | 3 months, 2016-01-01 to 2016-03-31 | $0.22 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2016-01-01 to 2016-03-31 | $0.22 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2016-01-01 to 2016-03-31 | 495,000,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months, 2016-01-01 to 2016-03-31 | $1.05bn | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 3 months, 2016-01-01 to 2016-03-31 | $1.23bn | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Dividends paid | 3 months, 2016-01-01 to 2016-03-31 | $219.0m | us-gaap:PaymentsOfDividendsCommonStock |
| Cash and equivalents | at 2016-03-31 | $142.0m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2016-03-31 | $5.63bn | us-gaap:AssetsCurrent |
| Total assets | at 2016-03-31 | $64.65bn | us-gaap:Assets |
| Current liabilities | at 2016-03-31 | $5.97bn | us-gaap:LiabilitiesCurrent |
| Long-term debt | at 2016-03-31 | $16.52bn | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2016-03-31 | $160.0m | us-gaap:LongTermDebtCurrent |
| Short-term borrowings | at 2016-03-31 | $693.0m | us-gaap:ShortTermBorrowings |
| Shareholders' equity | at 2016-03-31 | $16.61bn | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 80,038 characters.

### RESULTS OF OPERATIONS

### OVERVIEW

PG&E Corporation is a holding company whose primary operating subsidiary is Pacific Gas and Electric Company, a public utility operating in northern and central California. The Utility generates revenues mainly through the sale and delivery of electricity and natural gas to customers.

The Utility is regulated primarily by the CPUC and the FERC. The CPUC has jurisdiction over the rates and terms and conditions of service for the Utility’s electricity and natural gas distribution operations, electric generation, and natural gas transportation and storage. The FERC has jurisdiction over the rates and terms and conditions of service governing the Utility’s electric transmission operations and interstate natural gas transportation contracts. The NRC oversees the licensing, construction, operation, and decommissioning of the Utility’s nuclear generation facilities. The Utility also is subject to the jurisdiction of other federal, state, and local governmental agencies.

This is a combined quarterly report of PG&E Corporation and the Utility and should be read in conjunction with each company’s separate Condensed Consolidated Financial Statements and the Notes to the Condensed Consolidated Financial Statements included in this quarterly report. It should also be read in conjunction with the 2015 Form 10-K.

### Summary of Changes in Net Income and Earnings per Share

The following table is a summary reconciliation of the key changes, after-tax, in PG&E Corporation’s income available for common shareholders and EPS (as well as earnings from operations and EPS on an earnings from operations basis) compared to the same period in the prior year (see “Results of Operations” below). “Earnings from operations” is a non-GAAP financial measure and is calculated as income available for common shareholders less items impacting comparability. “Items impacting comparability” represent items that management does not consider part of the normal course of operations and affect comparability of financial results between periods. PG&E Corporation uses earnings from operations to understand and compare operating results across reporting periods for various purposes including internal budgeting and forecasting, short- and long-term operating plans, and employee incentive compensation. PG&E Corporation believes that earnings from operations provide additional insight into the underlying trends of the business allowing for a better comparison against historical results and expectations for future performance. Earnings from operations are not a substitute or alternative for GAAP measures such as income available for common shareholders and may not be comparable to similarly titled measures used by other companies.

*(in millions, except per share amounts)*

|  | Three Months Ended March 31, Earnings | EPS (Diluted) |
| --- | ---: | ---: |
| **Income Available for Common Shareholders - March 31, 2015** | **$31** | **$0.06** |
| Fines and penalties (1) | 369 | 0.77 |
| Pipeline-related expenses (2) | 10 | 0.02 |
| Legal and regulatory related expenses (2) | 8 | 0.02 |
| **Earnings from Operations -March 31, 2015 (3)** | **$418** | **$0.87** |
| Growth in rate base earnings | 26 | 0.05 |
| Timing of taxes (4) | (40) | (0.08) |
| Gain on disposition of SolarCity stock (5) | (14) | (0.03) |
| Increase in shares outstanding | - | (0.03) |
| Miscellaneous | 17 | 0.04 |
| **Earnings from Operations - March 31, 2016 (3)** | **$407** | **$0.82** |
| Butte fire related expenses (6) | (226) | (0.45) |
| Fines and penalties (1) | (51) | (0.10) |
| Pipeline-related expenses (2) | (13) | (0.03) |
| Legal and regulatory related expenses (2) | (10) | (0.02) |
| **Income Available for Common Shareholders - March 31, 2016** | **$107** | **$0.22** |

(1) Represents the impact of the Penalty Decision (see Note 9 of the Notes to the Condensed Consolidated Financial Statements for before-tax amounts).

(2) Represents pipeline-related expenses, including costs incurred to identify and remove encroachments from transmission pipeline rights of way and to perform remaining work under the Utility’s PSEP which only occurred in 2015. Legal and regulatory related expenses include various enforcement, regulatory, and litigation activities regarding natural gas matters and regulatory communications.

(3) “Earnings from operations” is not calculated in accordance with GAAP and excludes the items impacting comparability shown in Notes (1) and (2).

(4) Represents the timing of taxes reportable in quarterly financial statements.

(5)Represents the gain recognized during the three months ended March 31, 2015. No comparable gain was recognized in 2016.

(6)For the three months ended March 31, 2016, the Utility incurred charges of $350 million, pre-tax, related to estimated property damages in connection with the Butte fire and $31 million, pre-tax, for Utility clean-up, repair, and legal costs associated with the Butte fire, for a total of $381 million, pre-tax.

### Key Factors Affecting Financial Results

PG&E Corporation and the Utility believe that their future results of operations, financial condition, and cash flows will be materially affected by the following factors:

- *The Outcome of Enforcement, Litigation, and Regulatory Matters.* Future financial results will be impacted by the unrecoverable pipeline safety-related and remedies costs required by the Penalty Decision. (For more information about the Penalty Decision, see Note 9 of the Notes to the Condensed Consolidated Financial Statements.) The Utility’s future results may also be impacted by various other pending enforcement, litigation and regulatory actions, including but not limited to those related to the federal criminal charges and CPUC investigations of the Utility’s compliance with natural gas distribution facilities record-keeping practices,potential violations of the CPUC’s ex parte communication rules, the re-hearing of the 2006-2008 energy efficiency incentive awards, and the Butte fire. (See “Enforcement and Litigation Matters” in Note 9 of the Notes to the Condensed Consolidated Financial Statements in Item 1.)
- *The Timing and Outcome of Ratemaking Proceedings.* The 2015 GT&S rate case remains pending. The Utility requested that the CPUC authorize a $532 million increase in annual revenue requirements for gas transmission and storage operations beginning on January 1, 2015 with attrition increases in 2016 and 2017. Any revenue requirement increase that the CPUC may authorize would be retroactive to January 1, 2015 but would be recorded in the period a final decision is reached. (See “Regulatory Matters − 2015 Gas Transmission and Storage Rate Case” below for more information.) In February 2016, the Utility updated its 2017 GRC application to request that the CPUC authorize a revenue requirement increase of $333 million for 2017 for the Utility’s electric generation business and its electric and natural gas distribution businesses with attrition increases in 2018 and 2019. (See “Regulatory Matters − 2017 General Rate Case” below for more information.) The CPUC’s decisions in these cases are expected to be issued in 2016. The outcome of regulatory proceedings can be affected by many factors, including the level of opposition by intervening parties, potential rate impacts, the Utility’s reputation, the regulatory and political environments, and other factors.
- *The Ability of the Utility to Control and Recover Operating Costs and Capital Expenditures.* Whether the Utility is able to earn its authorized rate of return could be materially affected if the Utility’s actual costs differ from the amounts authorized in the rate case decisions. In addition to incurring shareholder-funded costs and costs associated with remedial measures required by the Penalty Decision, the Utility also forecasts that in 2016 it will incur unrecovered pipeline-related expenses ranging from $100 million to $150 million which primarily relate to costs to identify and remove encroachments from transmission pipeline rights-of-way. The ultimate amount of unrecovered costs also could be affected by how the CPUC determines which costs are included in determining whether the $850 million shareholder-funded obligation under the Penalty Decision has been met, and the outcome of pending and future investigations and enforcement matters. (See “Enforcement and Litigation Matters” in Note 9 of the Notes to the Condensed Consolidated Financial Statements in Item 1.) The Utility’s ability to recover costs in the future also could be affected by decreases in customer demand driven by legislative and regulatory initiatives relating to distributed generation resources, renewable energy requirements, and changes in the electric rate structure.
- *The Amount and Timing of the Utility’s Financing Needs.* PG&E Corporation contributes equity to the Utility as needed to maintain the Utility’s CPUC-authorized capital structure. For the three months ended March 31, 2016, PG&E Corporation issued $152 million of common stock and used $65 million of the cash proceeds to make equity contributions to the Utility. PG&E Corporation forecasts that it will continue issuing a material amount of equity in 2016 and future years to support the Utility’s capital expenditures. PG&E Corporation will issue additional equity to fund charges incurred by the Utility to comply with the Penalty Decision, to fund unrecoverable pipeline-related expenses, and to pay fines and penalties that may be required by the final outcomes of pending enforcement matters. These additional issuances would have a material dilutive impact on PG&E Corporation’s EPS. PG&E Corporation’s and the Utility’s ability to access the capital markets and the terms and rates of future financings could be affected by the outcome of the matters discussed in “Enforcement and Litigation Matters” in Note 9 of the Notes to the Condensed Consolidated Financial Statements in Item 1, Financial Statements and Supplementary Data, changes in their respective credit ratings, general economic and market conditions, and other factors.

41

For more information about the factors and risks that could affect future results of operations, financial condition, and cash flows, or that could cause future results to differ from historical results, see “Item 1A. Risk Factors”in the 2015 Form 10-K and in Part II below under “Item 1A. Risk Factors.” In addition, this quarterly report contains forward-looking statements that are necessarily subject to various risks and uncertainties. These statements reflect management’s judgment and opinions which are based on current estimates, expectations, and projections about future events and assumptions regarding these events and management’s knowledge of facts as of the date of this report. See the section entitled “Cautionary Language Regarding Forward-Looking Statements” below for a list of some of the factors that may cause actual results to differ materially. PG&E Corporation and the Utility are not able to predict all the factors that may affect future results and do not undertake an obligation to update forward-looking statements, whether in response to new information, future events, or otherwise.

### RESULTS OF OPERATIONS

The consolidated results of operations consist primarily of balances related to the Utility, which are discussed below. The following table provides a summary of net income available for common shareholders for the three months ended March 31,2016 and 2015:

*(in millions)*

|  | Three Months Ended March 31, 2016 | 2015 |
| --- | ---: | ---: |
| Consolidated Total | $107 | $31 |
| PG&E Corporation | 2 | 30 |
| Utility | $105 | $1 |

PG&E Corporation’s net income primarily consists of interest expense on long-term debt, income taxes, and other income from investments. Results in 2015 include approximately $30 million of realized gains and associated tax benefits related to an investment in SolarCity Corporation with no corresponding gains in 2016.

### Utility

The table below shows certain items from the Utility’s Condensed Consolidated Statements of Income for the threemonths ended March 31,2016 and 2015. The table separately identifies the revenues and costs that impacted earnings from those that did not impact earnings. In general, expenses the Utility is authorized to pass through directly to customers (such as costs to purchase electricity and natural gas, as well as costs to fund public purpose programs), and the corresponding amount of revenues collected to recover those pass-through costs, do not impact earnings. In addition, expenses that have been specifically authorized(such as the payment of pension costs) and the corresponding revenues the Utility is authorized to collect to recover such costs, do not impact earnings.

Revenues that impact earnings are primarily those that have been authorized by the CPUC and the FERC to recover the Utility’s costs to own and operate its assets and to provide the Utility an opportunity to earn its authorized rate of return on rate base. Expenses that impact earnings are primarily those that the Utility incurs to own and operate its assets.

The Utility’s operating results for the three months ended March 31, 2016 and 2015 reflect charges associated with the impact of the Penalty Decision. (See “Utility Revenues and Costs that Impacted Earnings” below.)

*(in millions)*

|  | Three Months Ended March 31, 2016 Revenues/Costs: That Impacted Earnings | That Did Not Impact Earnings | Total Utility | Three Months Ended March 31, 2015 Revenues/Costs: That Impacted Earnings | That Did Not Impact Earnings | Total Utility |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Electric operating revenues | $1,933 | $1,199 | $3,132 | $1,786 | $1,228 | $3,014 |
| Natural gas operating revenues | 523 | 320 | 843 | 506 | 380 | 886 |
| **Total operating revenues** | **2,456** | **1,519** | **3,975** | **2,292** | **1,608** | **3,900** |
| Cost of electricity | - | 950 | 950 | - | 1,000 | 1,000 |
| Cost of natural gas | - | 222 | 222 | - | 274 | 274 |
| Operating and maintenance | 1,664 | 347 | 2,011 | 1,589 | 334 | 1,923 |
| Depreciation, amortization, and decommissioning | 696 | - | 696 | 631 | - | 631 |
| **Total operating expenses** | **2,360** | **1,519** | **3,879** | **2,220** | **1,608** | **3,828** |
| **Operating income** | **96** | **-** | **96** | **72** | **-** | **72** |
| Interest income (1) |  |  | 4 |  |  | 1 |
| Interest expense (1) |  |  | (201) |  |  | (187) |
| Other income, net (1) |  |  | 24 |  |  | 26 |
| Income (loss) before income taxes |  |  | (77) |  |  | (88) |
| Income tax benefit (1) |  |  | (185) |  |  | (92) |
| Net income |  |  | 108 |  |  | 4 |
| Preferred stock dividend requirement (1) |  |  | 3 |  |  | 3 |
| **Income Available for Common Stock** |  |  | **$105** |  |  | **$1** |

(1) These items impacted earnings for the three months endedMarch 31,2016 and 2015.

### Utility Revenues and Costs that Impacted Earnings

The following discussion presents the Utility’s operating results for the three months ended March 31,2016 and 2015, focusing on revenues and expenses that impacted earnings for these periods.

#### Operating Revenues

The Utility’s electric and natural gas operating revenues that impacted earnings increased by $164 million, or 7%,in the three months ended March 31, 2016, compared to the same period in 2015 primarily due additional base revenues as authorized by the CPUC in the 2014 GRC decision and by the FERC in the TO rate case.

The Utility has requested the CPUC authorize an increase to its revenue requirements for 2015, 2016, and 2017 in its GT&S rate case. It is unlikely that the Utility will be able to recognize an increase in its GT&S revenue until the second half 2016 or a later period during which a final decision is issued. The CPUC’s decision in this case is expected to be issued in 2016. (See “Ratemaking Proceedings” below.)

#### Operating and Maintenance

The Utility’s operating and maintenance expenses that impacted earnings increased by $75million, or 5%,in the three months ended March 31, 2016 compared to the same period in 2015 primarily due to $381 million in charges related to the Butte Fire,approximately $90 million ofother operating expenses, $34 million of higher disallowed capital charges related to the Penalty Decision, and $30 million of higher benefit-related expenses. This increase was offset by $500 million in charges associated with the Penalty Decision for fines and customer refunds incurred in the first quarter of 2015 with no corresponding charges in 2016. (See Note 9 of the Notes to the Condensed Consolidated Financial Statements.)

The Utility’s future financial statements will continue to be impacted by additional charges associated with the Penalty Decision, costs related to the Butte Fire, and unrecoverable pipeline-related expenses. (See “Key Factors Affecting Financial Results” above and Note 9 of the Notes to the Condensed Consolidated Financial Statements.)

#### Depreciation, Amortization, and Decommissioning

The Utility’s depreciation, amortization, and decommissioning expenses increased by $65 million, or 10% in the three months ended March 31, 2016 compared to the same period in 2015. This increase was primarily due to the impact of capital additions and higher depreciation rates as authorized by CPUC in the 2014 GRC decision, which was first reflected in the third quarter of 2014, and by the FERC in the TO rate case.

#### Interest Income, Interest Expense, and Other Income, Net

There were no material changes to interest income, interest expense, and other income, net for the periods presented.

#### Income Tax Benefit

The income tax benefit increased by $93 million, or 101%in the three months ended March 31, 2016 as compared to the same period in 2015. The effective tax rates for the three months ended March 31, 2016 and 2015 were 241% and 105%, respectively. These increases were primarily driven by benefits resulting from various tax audit results in the three months ended March 31, 2016 with no comparable amounts in the three months ended March 31, 2015 and the tax impact of a non-deductible penalty accrued in the three months ended March 31, 2015 with no comparable amount in the three months ended March 31, 2016.

### Utility Revenues and Costs that did not Impact Earnings

Fluctuations in revenues that did not impact earnings are primarily driven by procurement costs. See below for more detail.

#### Cost of Electricity

TheUtility’s cost of electricity includes the costs of power purchased from third parties (including renewable energy resources), transmission, fuel used in its own generation facilities, fuel supplied to other facilities under power purchase agreements, costs to comply with California’s cap-and-trade program, and realized gains and losses on price risk management activities. (See Note 7 of the Notes to the Condensed Consolidated Financial Statements.)

*(in millions)*

|  | Three Months Ended March 31, 2016 | 2015 |
| --- | ---: | ---: |
| Cost of purchased power | $886 | $922 |
| Fuel used in own generation facilities | 64 | 78 |
| **Total cost of electricity** | **$950** | **$1,000** |
| Average cost of purchased power per kWh (1) | $0.104 | $0.099 |
| Total purchased power (in millions of kWh) (2) | 8,539 | 9,291 |

(1)Average cost of purchased power for the three months ended March 31, 2016 increased compared to the same period in 2015 primarily due to higher percentage of renewable energy resources. This increase was partially offset by lower market prices for natural gas.

(2) The decrease in purchased power resulted from an increase in generation from the Utility’s own generation facilities. Hydroelectric and nuclear generation increased during the three months ended March 31, 2016 as compared to the same periods in 2015.

The Utility’s total purchased power is driven by customer demand, the availability of the Utility’s own generation facilities (including the Diablo Canyon nuclear generation power plant and hydroelectric plants), and the cost-effectiveness of each source of electricity.

#### Cost of Natural Gas

The Utility’s cost of natural gas includes the costs of procurement, storage, transportation of natural gas, costs to comply with California’s cap-and-trade program, and realized gains and losses on price risk management activities. (See Note 7 of the Notes to the Condensed Consolidated Financial Statements.) The Utility’s cost of natural gas is impacted by the market price of natural gas, changes in the cost of storage and transportation, and changes in customer demand.

*(in millions)*

|  | Three Months Ended March 31, 2016 | 2015 |
| --- | ---: | ---: |
| Cost of natural gas sold | $181 | $235 |
| Transportation cost of natural gas sold | 41 | 39 |
| **Total cost of natural gas** | **$222** | **$274** |
| Average cost per Mcf (1) of natural gas sold (2) | $2.26 | $3.26 |
| Total natural gas sold (in millions of Mcf) (1) | 80 | 72 |
| (1) One thousand cubic feet |  |  |

(2) Average cost of natural gas sold primarily impacted by a decline in the market price of natural gas in the three months ended March 31, 2016 compared to the same period in 2015.

#### Operating and Maintenance Expenses

The Utility’s operating expenses also include certain recoverable costs that the Utility incurs as part of its operations such as pension contributions and public purpose programs costs. If the Utility were to spend over authorized amounts, these expenses could have an impact on earnings.

### LIQUIDITY AND FINANCIAL RESOURCES

### Overview

The Utility’s ability to fund operations, finance capital expenditures, and make distributions to PG&E Corporation depends on the levels of its operating cash flows and access to the capital and credit markets. The CPUC authorizes the Utility’s capital structure, the aggregate amount of long-term and short-term debt that the Utility may issue, and the revenue requirements the Utility is able to collect to recover its debt financing costs. The Utility generally utilizes equity contributions from PG&E Corporation and long-term senior unsecured debt issuances to maintain its CPUC-authorized capital structure consisting of 52% equity and 48% debt and preferred stock. The Utility relies on short-term debt, including commercial paper, to fund temporary financing needs.

PG&E Corporation’s ability to fund operations, make scheduled principal and interest payments, fund equity contributions to the Utility, and pay dividends, primarily depends on the level of cash distributions received from the Utility and PG&E Corporation’s access to the capital and credit markets. PG&E Corporation has material stand-alone cash flows related to the issuance of equity and long-term debt, dividend payments, and borrowings and repayments under its revolving credit facility. PG&E Corporation relies on short-term debt, including commercial paper, to fund temporary financing needs.

PG&E Corporation’s equity contributions to the Utility are funded primarily through common stock issuances. PG&E Corporation forecasts that it will issue between $600 million and $800 million in common stock during 2016, primarily to fund equity contributions to the Utility. The Utility’s equity needs will continue to be affected by charges incurred to comply with the Penalty Decision, by the timing and outcome of the 2015 GT&S rate case, by unrecoverable pipeline-related expenses, and by fines and penalties that may be imposed in connection with the matters described in “Enforcement and Litigation Matters” below. Common stock issuances by PG&E Corporation to fund these needs would have a material dilutive impact on PG&E Corporation’s EPS.

### Cash and Cash Equivalents

Cash and cash equivalents consist of cash and short-term, highly liquid investments with original maturities of three months or less. PG&E Corporation and the Utility maintain separate bank accounts and primarily invest their cash in money market funds. In addition to cash and cash equivalents, the Utility holds restricted cash that primarily consists of cash held in escrow pending the resolution of the remaining disputed claims that were filed in the Utility’s reorganization proceedings under Chapter 11 of the U.S. Bankruptcy Code. (See “Resolution of Remaining Chapter 11 Disputed Claims” in Note 9 of the Notes to the Condensed Consolidated Financial Statements.) The Utility is uncertain when and how the remaining disputed claims will be resolved.

### Financial Resources

### Debt and Equity Financings

During the three months ended March 31, 2016, PG&E Corporation sold 1.3 million shares under its February 2015 equity distribution agreement for cash proceeds of $74 million, net of commissions paid of $1 million. As of March 31, 2016, the remaining gross sales available under this agreement were $350 million.

PG&E Corporation also issued common stock under the PG&E Corporation 401(k) plan, the Dividend Reinvestment and Stock Purchase Plan, and share-based compensation plans. During the three months ended March 31, 2016, 2.3 million shares were issued for cash proceeds of $72 million under these plans.

The proceeds from these sales were used for general corporate purposes, including the contribution of equity to the Utility. For the three months ended March 31, 2016, PG&E Corporation made equity contributions to the Utility of $65 million.

In March 2016, the Utility issued $600 million principal amount of 2.95% Senior Notes due March 1, 2026. The proceeds were used for general corporate purposes, including the repayment of a portion of the Utility’s outstanding commercial paper. In addition, in March 2016, the Utility entered into a $250 million floating rate unsecured term loan that matures on February 2, 2017. The proceeds were used for general corporate purposes, including the repayment of a portion of the Utility’s outstanding commercial paper.

### Revolving Credit Facilities and Commercial Paper Program

At March 31, 2016, PG&E Corporation and the Utility had $300 million and $2.5 billion available under their respective $300 million and $3.0 billion revolving credit facilities. (See Note 4 of the Notes to the Condensed Consolidated Financial Statements.)

The revolving credit facilities require that PG&E Corporation and the Utility maintain a ratio of total consolidated debt to total consolidated capitalization of at most 65% as of the end of each fiscal quarter. At March 31, 2016, PG&E Corporation’s and the Utility’s total consolidated debt to total consolidated capitalization was 51% and 50%, respectively. PG&E Corporation’s revolving credit facility agreement also requires that PG&E Corporation own, directly or indirectly, at least 80% of the common stock and at least 70% of the voting capital stock of the Utility. In addition, the revolving credit facilities include usual and customary provisions regarding events of default and covenants including covenants limiting liens to those permitted under PG&E Corporation’s and the Utility’s senior note indentures, mergers, and imposing conditions on the sale of all or substantially all of PG&E Corporation’s and the Utility’s assets and other fundamental changes. At March 31, 2016, PG&E Corporation and the Utility were in compliance with all covenants under their respective revolving credit facilities.

### Dividends

In February 2016, the Board of Directors of PG&E Corporation declared quarterly dividends of $0.455 per share, totaling $226 million, of which approximately $221 million was paid on April 15, 2016, to shareholders of record on March 31, 2016.

In February 2016, the Board of Directors of the Utility declared a common stock dividend of $179 million that was paid to PG&E Corporation on February 19, 2016.

In February 2016, the Board of Directors of the Utility declared dividends on its outstanding series of preferred stock, payable on May 15, 2016, to shareholders of record on April 29, 2016.

### Utility Cash Flows

The Utility’s cash flows were as follows:

*(in millions)*

|  | Three Months Ended March 31, 2016 2016 | 2015 |
| --- | ---: | ---: |
| Net cash provided by operating activities | $1,063 | $1,101 |
| Net cash used in investing activities | (1,250) | (1,272) |
| Net cash provided by financing activities | 172 | 166 |
| **Net change in cash and cash equivalents** | **$(15)** | **$(5)** |

### Operating Activities

The Utility’s cash flows from operating activities primarily consist of receipts from customers less payments of operating expenses, other than expenses such as depreciation that do not require the use of cash. During the three months ended March 31, 2016, net cash provided by operating activities decreased by $38 million compared to the same period in 2015. This decrease was primarily due to fluctuations in activities within the normal course of business such as the timing and amount of customer billings and collections.

Future cash flow from operating activities will be affected by various factors, including:

- the shareholder-funded bill credit of $400 million to natural gas customers in 2016, as required by the Penalty Decision (see Note 9 of the Notes to the Condensed Consolidated Financial Statements);
- the timing and amounts of other fines or penalties that may be imposed in connection with the criminal prosecution of the Utility and the remaining investigations and other enforcement and litigation matters (see Note 9 of the Notes to the Condensed Consolidated Financial Statements);
- the timing and outcome of ratemaking proceedings, including the 2015 GT&S rate case and the 2017 GRC;
- the timing and amount of costs the Utility incurs, but does not recover, associated with its natural gas system (including costs to implement remedial measures and $850 million to pay for designated pipeline safety projects and programs, as required by the Penalty Decision);
- the timing and amount of tax payments (including the bonus depreciation), tax refunds, net collateral payments, and interest payments; and
- the timing of the resolution of the Chapter 11 disputed claims and the amount of principal and interest on these claims that the Utility will be required to pay.

### Investing Activities

Net cash used in investing activities decreased by $22 million during the three months ended March 31, 2016 as compared to the same period in 2015. The Utility’s investing activities primarily consist of construction of new and replacement facilities necessary to provide safe and reliable electricity and natural gas services to its customers. Cash used in investing activities also includes the proceeds from sales of nuclear decommissioning trust investments which are largely offset by the amount of cash used to purchase new nuclear decommissioning trust investments. The funds in the decommissioning trusts, along with accumulated earnings, are used exclusively for decommissioning and dismantling the Utility’s nuclear generation facilities.

Future cash flows used in investing activities are largely dependent on the timing and amount of capital expenditures. The Utility estimates that it will incur approximately $5.6 billion in capital expenditures in 2016 and between $5.4 billion and $6.5 billion in 2017.

### Financing Activities

During the three months ended March 31, 2016, net cash provided by financing activities increased by $6 million compared to the same period in 2015. Cash provided by or used in financing activities is driven by the Utility’s financing needs, which depend on the level of cash provided by or used in operating activities, the level of cash provided by or used in investing activities, the conditions in the capital markets, and the maturity date of existing debt instruments. The Utility generally utilizes long-term debt issuances and equity contributions from PG&E Corporation to maintain its CPUC-authorized capital structure, and relies on short-term debt to fund temporary financing needs.

### ENFORCEMENT AND LITIGATION MATTERS

PG&E Corporation and the Utility have significant contingencies arising from their operations, including contingencies related to the enforcement and litigation matters described in Note 9 in the Condensed Consolidated Financial Statements. The outcome of these matters, individually or in the aggregate, could have a material effect on PG&E Corporation’s and the Utility’s future financial results. In addition, PG&E Corporation and the Utility are involved in other enforcement and litigation matters described in the 2015 Form 10-K and Part II. Other Information, Item 1. Legal Proceedings. Significant regulatory developments that have occurred since the 2015 Form 10-K was filed with the SEC are discussed below.

### Department of Interior Inquiry

In September 2015, the Utility was notified that the DOI had initiated an inquiry into whether the Utility should be suspended or debarred from entering into federal procurement and non-procurement contracts and programs citing the allegations contained in the superseding federal criminal indictment discussed in Note 9 of the Notes to the Condensed Consolidated Financial Statements. The Utility filed its initial response on November 2, 2015 to demonstrate that it is a presently responsible contractor under federal procurement regulations and that it believes suspension or debarment is not appropriate. On April 8, 2016, the Utility received a series of follow-up questions from the DOI regarding the Utility’s November 2015 submission. The DOI has not yet set a timeline for the Utility’s response to the questions. It is uncertain when or if further action will be taken by DOI following the Utility’s response.

### Litigation Related to the San Bruno Accident and Natural Gas Spending

As of March 31, 2016, there were seven purported derivative lawsuits seeking recovery on behalf of PG&E Corporation and the Utility for alleged breaches of fiduciary duty by officers and directors, among other claims.

On February 27, 2016, a new shareholder derivative complaint, *Bushkin v. Rambo et al*., was filed in the United States District Court for the Northern District of California. This complaint has been designated by the plaintiff as related to the pending shareholder derivative suit *Iron Workers Mid-South Pension Fund v. Johns, et al.*, discussed below. The *Bushkin* complaint seeks to hold certain individual defendants responsible on claims of breach of fiduciary duty for damage to the company caused by the San Bruno accident, as well as by an alleged obstruction of the NTSB's investigation into the San Bruno accident and an alleged false statement related to PG&E Corporation’s corporate governance practices in its 2015 Proxy Statement. A case management conference on this matter is currently set for June 17, 2016.

A case management conference in the *Iron Workers* action pending in the United States District Court for the Northern District of California is currently set for June 3, 2016. Aside from the June 3, 2016 case management conference, the case has been stayed pending conclusion of the federal criminal proceedings against the Utility. As previously disclosed, on December 8, 2015, the California Court of Appeal issued a writ of mandate to the Superior Court of California, San Mateo County, ordering the Court to stay all proceedings in the four consolidated *San Bruno Fire Derivative Cases* pending conclusion of the federal criminal proceedings against the Utility.

A case management conference in the action entitled *Tellardin v. PG&E Corp. et al.,* also pending in the Superior Court of California, San Mateo County, is currently set for August 9, 2016. PG&E Corporation and the Utility are uncertain when and how the above lawsuits will be resolved.

### REGULATORY MATTERS

The Utility is subject to substantial regulation by the CPUC, the FERC, the NRC and other federal and state regulatory agencies. Significant regulatory developments that have occurred since the 2015 Form 10-K was filed with the SECare discussed below.

### 2017 General Rate Case

In the 2017 GRC, the Utility has requested that the CPUC determine the annual amount of base revenues (or “revenue requirements”) that the Utility will be authorized to collect from customers from 2017 through 2019 to recover its anticipated costs for electric distribution, natural gas distribution, and electric generation operations and to provide the Utility an opportunity to earn its authorized rate of return. (The Utility’s revenue requirements for other portions of its operations, such as electric transmission, natural gas transmission and storage services, and electricity and natural gas purchases, are authorized in other regulatory proceedings overseen by the CPUC or the FERC.)

The Utility’s supplemental testimony filed on February 22, 2016, reduced the Utility's previously requested 2017 revenue requirement increase of $457 million (as compared to the 2016 authorized amount of $7.9 billion) to $333 million, representing a $124 million reduction from the previous request. The requested increase for 2018 was reduced from $489 million to $469 million, and the requested increase for 2019 was reduced from $390 million to $368 million. The Utility reduced its requested increase primarily to reflect the impact of the five-year extension of the federal tax code provisions regarding bonus depreciation, as well as the tax-deductibility of repair costs.

On April 8, 2016, ORA submitted its testimony. For 2017, instead of the Utility’s requested increase, ORA recommended an $85 million reduction (approximately 1.1%) from the Utility’s currently authorized 2016 revenue requirement. For 2018 and 2019, ORA proposed increases of $274 million and $283 million, respectively (representing an approximately 3.5% annual increase), significantly below the Utility’s requested attrition increases of $469 million and $368 million, respectively. ORA also recommended to extend the GRC cycle another year and recommends a 2020 increase of $294 million (a 3.5% increase).

On April 29, 2016, TURN and several other intervening parties filed their testimonies. While TURN’s proposal does not include a revenue requirement recommendation for 2017, TURN recommended significant reductions to 2017 forecast operating expense, capital expenditures and other items. For 2018 and 2019, TURN presented a revenue requirement increase proposal of $469 million (representing an approximately 5.9% annual increase) and $250 million (representing an approximately 3.0% annual increase), respectively.

The table below summarizes the differences between the Utility’s revenue requirement increase proposal (based on the February 22, 2016 update), and ORA’s and TURN’s recommendations:

| Year | Utility's Proposal (in millions) | ORA's Recommendation (in millions) Increase / (Decrease) |  | Difference (1) (Decrease) | TURN's Recommendation (in millions) Increase / (Decrease) |  | Difference Increase/(Decrease) |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| 2017 | $333 | $(85) |  | $(418) | $N/A | (2) | $N/A |
| 2018 | 469 | 274 |  | (195) | 469 |  | - |
| 2019 | 368 | 283 |  | (85) | 250 |  | (118) |
| 2020 | N/A | 294 | (3) | N/A | N/A |  | N/A |

(1) Reflects the difference between the Utility’s proposal and the recommendation.

(2) TURN’s proposal does not include a revenue requirement recommendation for 2017.

(3) Reflects ORA’s recommendation to extend the GRC cycle another year.

For 2017, ORA accepted the Utility’s capital expenditure forecasts in most lines of business. The reduction proposed by ORA is primarily related to operating expenses. ORA recommended reductions in programs across all major lines of business, including programs such as gas leak survey frequency, gas record consolidation, information technology programs, electric operations and automation, hydroelectric programs, residential rate reform education and outreach (ORA recommended that these costs be tracked in a memorandum account), and enterprise records and information management. ORA also recommended reductions in administrative and general expenses, employee incentive compensation and benefits, as well as general business expenses, such as insurance. ORA’s recommended capital reductions for 2015, 2016, and 2017 would result in a rate base reduction of nearly $200 million in 2017 compared to the Utility’s 2017 forecast of $24.5 billion in the GRC lines of business.

For 2017, TURN recommended significant reductions to forecast operating expense, capital expenditures and other items across the major lines of business. TURN recommended reductions in gas programs, including pipeline replacement, replacement of gas services; electric programs, including new business and substation equipment replacement and grid modernization programs; customer service programs; and real estate programs. TURN also recommended reductions in administrative and general expenses, as well as employee incentive compensation and benefits. For 2017, TURN’s recommended reductions in operating expense and capital expenditures amount to approximately $166 million and $733 million, respectively.

The following table shows the difference between the Utility’s requested increases in 2017 revenue requirements (based on the February 22, 2016 update) and ORA’s recommended amounts by line of business:

| (in millions) Line of Business: | Utility's Proposal |  | ORA's Recommendation Increase / (Decrease) (1) |  | Difference (1) (2) Increase / (Decrease) |
| --- | ---: | ---: | ---: | ---: | ---: |
| Electric distribution | $71 | 1.7% | $(146) | (3.5)% | $(217) |
| Gas distribution | 63 | 3.6 | (59) | (3.4) | (122) |
| Electric generation | 199 | 10.1 | 119 | 6.1 | (80) |
| **Total revenue requirements** | **$333** | **4.2%** | **$(85)** | **(1.1)%** | **$(418)** |

(1) Certain amounts have been rounded.

(2) Reflects the difference between the Utility’s proposal and the recommendation.

TURN did not present revenue requirement recommendations by line of business.

In addition, 11 other parties provided recommendations. The Alliance for Nuclear Responsibility recommended for the Utility’s Diablo Canyon nuclear power plant an annual filing on the Utility’s plans to extend the license, a new performance-based ratemaking measure and various disallowances. The Coalition of California Utility Employees, which represents the International Brotherhood of Electrical Workers, recommended increasing funding for gas operations (such as for pipe replacement and leak survey frequency) and for electric operations (such as for fault location isolation and services restoration, also known as FLISR, overhead fuses, poles, and cable), and reducing depreciation expense for gas mains and poles. Other parties made various other recommendations regarding investments in connection with electric reliability, leak management practices, safety, executive compensation, customer outreach, local office closures, and supplier and employee diversity.

The following tables show the Utility’s currently requested amounts compared to 2016 authorized amounts:

*(in millions)*

| Line of Business: | Amounts Requested | Amounts Currently Authorized For 2016 | Increase Compared to Currently Authorized Amounts |
| --- | ---: | ---: | ---: |
| Electric distribution | $4,284 | $4,213 | $71 |
| Gas distribution | 1,804 | 1,741 | 63 |
| Electric generation | 2,161 | 1,962 | 199 |
| **Total revenue requirements** | **$8,249** | **$7,916** | **$333** |
| **Cost Category:** |  |  |  |
| (in millions) |  |  |  |
| Operations and maintenance | $1,833 | $1,664 | $169 |
| Customer services | 367 | 319 | 48 |
| Administrative and general | 975 | 1,011 | (36) |
| Less: Revenue credits | (140) | (131) | (9) |
| Franchise fees, taxes other than income, and other adjustments | 184 | 37 | 147 |
| Depreciation (including costs of asset removal), return, and |  |  |  |
| income taxes | 5,030 | 5,016 | 14 |
| **Total revenue requirements** | **$8,249** | **$7,916** | **$333** |

According to the CPUC’s procedural schedule, rebuttal testimonies are scheduled to be submitted by the Utility and other parties on May 27, 2016. Evidentiary hearings are to be held this summer, followed by a proposed decision to be released in November 2016 and a final CPUC decision to be issued in December 2016. On March 17, 2016, the CPUC issued a decision to allow the authorized revenue requirement changes to become effective on January 1, 2017, even if the final decision is issued after that date.

### 2015 Gas Transmission and Storage Rate Case

In the 2015 GT&S rate case, the Utility requested that the CPUC authorize a 2015 revenue requirement of $1.263 billion to recover anticipated costs of providing natural gas transmission and storage services, an increase of $532 million over currently authorized amounts. The Utility also requested attrition increases of $83 million in 2016 and $142 million in 2017. The Utility requested that the CPUC authorize the Utility’s forecast of its 2015 weighted average rate base for its gas transmission and storage business of $3.44 billion, which includes capital spending above authorized levels for the prior rate case period.

ORA has recommended a 2015 revenue requirement of $1.044 billion, an increase of $329 million over authorized amounts. TURN recommended that the Utility not recover costs associated with hydrostatic testing for pipeline segments placed in service after January 1, 1956, as well as certain other work that TURN considers to be remedial. TURN also recommended the disallowance of about $200 million of capital expenditures incurred over the period 2011 through 2014 and recommended that about $500 million of capital expenditures during this period be subject to a reasonableness review and an independent audit. TURN stated that the Utility’s cost recovery should not begin until the CPUC issues a decision on the independent audit.

The Utility also has proposed changes to the revenue sharing mechanism authorized in the last GT&S rate case (covering 2011-2014) that subjected a portion of the Utility’s transportation and storage revenue requirement to market risk. The Utility proposed full balancing account treatment that allows for recovery of the Utility’s authorized transportation and storage revenue requirements (except for the revenue requirement associated with the Utility’s 25% interest in the Gill Ranch storage field).

Based on the scoping ruling and procedural schedule that was issued on June 11, 2015, the CPUC plans to issue an initial decision to authorize revenue requirements followed by a second decision to reduce the authorized revenue requirements by the costs of designated safety-related projects and programs of $850 million cost disallowance imposed by the Penalty Decision. (See Note 9 in the Condensed Consolidated Financial Statements for more information about the CPUC’s Penalty Decision.) (In accordance with an earlier CPUC decision regarding the Utility’s violation of the CPUC’s ex parte communication rules made in the GT&S rate case, the first decision could disallow the Utility from recovering up to a five-month portion of the revenue increase that may otherwise have been authorized.) The second CPUC decision is expected to identify the costs that are counted toward the $850 million shareholder-funded obligation. If the Utility’s actual costs exceed costs that the CPUC counts towards the $850 million maximum, the Utility would record additional charges if such costs are not otherwise authorized by the CPUC.

The authorized revenue requirements in the 2015 GT&S rate case would be retroactive to January 1, 2015but would be recorded in the period a final decision is issued. Both decisions are anticipated in 2016.

### CPUC Cost of Capital Decision

On February 25, 2016, the CPUC issued a decision granting a petition for modification filed by the Utility and the other two California investor-owned electric utilities to clarify that the CPUC’s previously adopted cost of capital adjustment mechanism would not be triggered before their 2018 cost of capital applications are due on April 20, 2017. As a result, the Utility’s currently authorized return on equity of 10.40% and capital structure, consisting of 52% common equity, 47% long-term debt, and 1% preferred stock, will remain the same for 2017.

### Asset Retirement Obligations

Detailed studies of the cost to decommission the Utility’s nuclear generation facilities are conducted every three years in conjunction with the NDCTP. On March 1, 2016, the Utility submitted its updated decommissioning cost estimate with the CPUC in its 2015 NDCTP. The estimated undiscounted cost to decommission the Utility’s nuclear power plants increased by approximately $1.4 billion, for a total estimated cost of $4.8 billion, due to increased estimated costs related to spent fuel storage, staffing, and out-of-state waste disposal. Actual decommissioning costs may vary from these estimates as a result of changes in assumptions such as decommissioning dates; regulatory requirements; technology; and costs of labor, materials, and equipment. The Utility recovers its revenue requirements for decommissioning costs from customers through a non-bypassable charge that the Utility expects will continue until those costs are fully recovered. The Utility requested that the CPUC authorize the collection of increased annual revenue requirements beginning on January 1, 2017 based on these updated cost estimates.

On April 4, 2016, TURN and ORA submitted protests to the Utility’s 2015 NDCTP. TURN indicated that it intends to thoroughly review the Utility’s power plants cost estimate to determine overall reasonableness of the Utility’s request and that the Utility should be required to provide an alternative assessment of decommissioning costs and funding requirements if the Diablo Canyon license is renewed.ORA requested an evidentiary hearing to develop a full and complete record of the support and justification for the Utility’s 2015 NDCTP application. On April 14, 2016, the Utility filed its response and objected to TURN’s proposal for an alternate assessment of Diablo Canyon costs.

The estimated nuclear decommissioning cost is discounted for GAAP purposes and recognized as an ARO on the Condensed Consolidated Balance Sheets. The total nuclear decommissioning obligation accrued in accordance with GAAP was $3.3 billion at March 31, 2016, which includes an $818 million adjustment to reflect the increased cost estimates described above, and $2.5 billion at December 31, 2015. These estimates are based on the 2016 decommissioning cost studies prepared in accordance with the CPUC requirements. Changes in these estimates could materially affect the amount of the recorded ARO for these assets.

### CPUC Investigation of the Utility’s Safety Culture

On August 27, 2015, the CPUC began a formal investigation into whether the organizational culture and governance of PG&E Corporation and the Utility prioritize safety and adequately direct resources to promote accountability and achieve safety goals and standards. The CPUC directed the SED to evaluate the Utility’s and PG&E Corporation’s organizational culture, governance, policies, practices, and accountability metrics in relation to the Utility’s record of operations, including its record of safety incidents. The CPUC authorized the SED to engage a consultant to assist in the SED’s investigation and the preparation of a report containing the SED’s assessment. The consultant’s work is expected to begin in the second quarter of 2016.

The CPUC stated that the initial phase of the proceeding was categorized as rate setting because it will consider issues both of fact and policy and because the Utility and PG&E Corporation do not face the prospect of fines, penalties, or remedies in this phase. Upon completion of the consultant’s report, the assigned Commissioner will determine the scope of and next actions in the proceeding. The timing scope and potential outcome of the investigation are uncertain.

### Rehearing of CPUC Decisions Approving 2006 – 2008 Energy Efficiency Incentive Awards

On September 17, 2015, the CPUC granted TURN’s and ORA’s long-standing applications for rehearing of the CPUC decisions that awarded energy efficiency incentive payments to the California IOUs for the 2006-2008 energy efficiency program cycle. Under the incentive ratemaking mechanism applicable to the 2006-2008 program cycle, the Utility could have earned incentive revenues up to a maximum of $180 million, depending on the extent to which the Utility achieved the energy savings targets. Conversely, to the extent the Utility failed to achieve the targets, the Utility could have been required to offset future incentive earnings claims by amounts previously awarded, and, in addition, could have incurred penalties of up to $180 million. The Utility was awarded a total of $104 million for the 2006-2008 program cycle. In the re-opened proceeding, the CPUC will evaluate whether the incentive amounts awarded to the IOUs were just and reasonable, and whether any refunds are due.

On March 18, 2016, TURN and ORA submitted a joint proposal to require the refund of incentive awards that TURN and ORA argue were not calculated in accordance with the ratemaking mechanism rules and procedures the CPUC had previously adopted. TURN and ORA contended that the CPUC should order the Utility to refund $104 million, the entire incentive earnings award, plus interest, to customers as either (1) a revenue credit to customers’ distribution and gas transportation accounts or (2) as a line item to the customers’ first monthly bill following the issuance of a CPUC decision.

Additionally, on March 18, 2016, the IOUs submitted their proposals requesting that the CPUC reaffirm its prior decisions. The IOUs asserted that, given the many unresolved disputes about the data in the Energy Division’s 2010 Evaluation Report, the CPUC appropriately used different data to calculate the awards. The IOUs noted that under the incentive ratemaking mechanism, any refunds of prior incentive earnings should be deducted from future incentive earnings claims.

On April 8, 2016, the IOUs, TURN and ORA filed comments on the proposals, in which the parties reiterated their requests. The Utility currently expects that evidentiary hearings, if ordered by the CPUC, would be held in July 2016. It is uncertain how the CPUC will resolve this matter and when the CPUC will issue a decision.

PG&E Corporation and the Utility believe it is reasonably possible that the Utility will be required to refund amounts previously awarded or incur other obligations related to this matter, but they are unable to reasonably estimate the amount of such refunds or other obligations. If the Utility were required to make a refund as TURN and ORA propose, PG&E Corporation’s and the Utility’s financial results would be affected by the amount of any refund-related charges.

### OTHER MATTERS

### Agreement with TransCanyon, LLC for Competitive Transmission Opportunities

On March 29, 2016, the Utilityentered into an agreement with TransCanyon, LLC, a joint venture between subsidiaries of Berkshire Hathaway Energy and Pinnacle West Capital Corporation, to jointly pursue competitive transmission opportunities solicited by the CAISO, the operator for the majority of the California electric transmission grid. The Utility and TransCanyon intend to jointly engage in the development of future transmission infrastructure and compete to develop, build, own and operate transmission projects approved by the CAISO.

### LEGISLATIVE AND REGULATORY INITIATIVES

The California Legislature and the CPUC have adopted requirements and policies to accommodate the growth in distributed electric generation resources (including solar installations), increase the amount of renewable energy delivered to customers, foster the development of a state-wide electric vehicle charging infrastructure to encourage the use of electric vehicles, promote customer energy efficiency and demand response programs, and implement new state law requirements applicable to natural gas storage facilities. In addition, the CPUC continues to implement state law requirements to reform electric rates to more closely reflect the utilities’ actual costs of service, reduce cross-subsidization among customer rate classes, implement new rules and rates for net energy metering (which currently allow certain self-generating customers to receive bill credits for surplus power at the full retail rate), and allow customers to have greater control over their energy use. Significant developments that have occurred since the 2015 Form 10-K was filed with the SEC are discussed below.

The Utility’s ability to recover its costs, including investments associated with legislative and regulatory initiatives, as well as its electricity procurement and other operating costs, will, in large part, depend on the final form of legislative or regulatory requirements, and whether the associated ratemaking mechanisms can be timely adjusted to reflect changes in customer demand for the Utility’s electricity and natural gas service.

#### Electric Distribution Resources Plan

As required by California law, on July 1, 2015, the Utility filed its proposed electric distribution resources plan for approval by the CPUC. The Utility’s plan identifies optimal locations on its electric distribution system for deployment of distributed energy resources. The Utility’s proposal is designed to allow energy technologies to be interconnected with each other and integrated into the larger grid while continuing to provide customers with safe, reliable and affordable electric service. The Utility envisions a future electric grid, titled the Grid of Things™, that would allow customers to choose new advanced energy supply technologies and services to meet their needs consistent with safe, reliable and affordable electric service. The Utility’s 2017 GRC includes a request to recover some of the investment costs that it forecasts it will incur under its proposed electric distribution resources plan.

#### Integrated Distributed Energy Resources Pilot Program

On April 4, 2016, the assigned CPUC Commissioner and ALJ issued a ruling proposing to establish, on a pilot basis, an interim program offering regulatory incentives to the Utility and the other two large California IOUs for the deployment of cost-effective distributed energy resources (“DERs”). The ruling assumes that the incentive would take the form of an additional payment to the utility of 3.5% (grossed up for taxes) of the payments made to the DERprovider(s). The exact figure would be determined later if the proposal or a similar alternative is adopted by the CPUC. The ruling also states that it does not intend for this phase to adopt a new regulatory framework or business model for the California electric utilities. Comments on the proposal are due May 9, 2016 and reply comments are due May 23, 2016.

#### Electric Rate Reform and Net Energy Metering

On July 3, 2015, the CPUC approved a final decision to authorize the California IOUs to gradually flatten their tiered residential electric rate structures from four tiers to two tiers by January 1, 2019. The decision approved increased minimum bill charges for residential customers and also allows the imposition of a surcharge on customers with extremely high electricity use beginning in 2017. The decision requires the Utility to file a proposal by January 1, 2018, to charge residential electric customers based on time-of-use rates (known as “default time-of-use rates”) unless customers elect otherwise. The Utility also may propose to impose a fixed charge on residential electric customers. Under the CPUC’s decision, default time-of-use rates must be implemented before the CPUC will permit the imposition of a fixed charge in electric rates.

In January 2016, the CPUC adopted new NEM rules and rates. The new rules and rates are expected to become effective for new NEM customerslater in 2016. New NEM customers will be required to pay an interconnection fee, will be charged on time-of-use rates, and will be required to pay non-bypassable charges to help fund some of the costs of low-income, energy efficiency, and other programs that other customers pay. On March 7, 2016, the Utility and certain other parties, including TURN and CUE, filed applications for rehearing. The Utility requested that the CPUC vacate its January 2016 decision that the Utility asserts contains legal and factual errors. Many parties argued that the CPUC failed to complete its duties under AB 327, which required the CPUC to evaluate the costs and benefits of NEM.

#### Electric Vehicle (EV) Infrastructure Development

In December 2014, the CPUC issued a decision adopting a policy to expand the California utilities’ role in developing an EV charging infrastructure to support California’s climate goals. On February 9, 2015, the Utility filed an application requesting that the CPUC approve the Utility’s proposal to deploy, own, and maintain more than 25,000 EV charging stations and the associated infrastructure. The Utility proposed to engage with third-party EV service providers to operate and maintain the charging stations. The Utility requested that the CPUC approve forecasted capital expenditures of $551 million over the 5-year deployment period.

On September 4, 2015, the assigned CPUC Commissioner and the ALJ issued a scoping memo and procedural schedule that required the Utility to supplement its application by submitting a more phased deployment approach that will be considered in a first phase of the proceeding. On October 12, 2015, the Utility submitted supplemental testimony presenting two separate proposals. In its first proposal, the Utility has requested that the CPUC approve approximately $70 million in capital expenditures to deploy and own 2,510 EV charging stations over approximately 2 years. In its second proposal, the Utility has requested that the CPUC approve approximately $187 million in capital expenditures to deploy and own 7,530 EV charging stations over approximately 3 years.

On March 21, 2016, the Utility filed with the CPUC a settlement agreement that it entered into with certain parties, including environmental advocates, automakers, electric vehicle drivers, labor, and environmental justice advocates, that makes adjustments to the Utility’s second proposal, including a reduction to requested capital expenditures to approximately $132 million. (TURN, ORA, and certain equipment suppliers are not parties to the agreementand filed responses on April 12, 2016, generally opposing the settlement.) The settlement agreement is subject to approval by the CPUC. Hearings were held in April 2016 and under the CPUC’s schedule, a proposed decision for the first phase of the proceeding is expected to be issued in the third quarter of 2016. Further deployment of EV charging stations would be considered in a second phase of the proceeding depending on the outcome of the first phase.

### ENVIRONMENTAL MATTERS

The Utility’s operations are subject to extensive federal, state, and local laws and permits relating to the protection of the environment and the safety and health of the Utility’s personnel and the public. These laws and requirements relate to a broad range of the Utility’s activities, including the remediation of hazardous wastes, such as groundwater contamination caused by hexavalent chromium used in the past at the Utility’s natural gas compressor stations; the reporting and reduction of carbon dioxide and other greenhouse gas emissions; the discharge of pollutants into the air, water, and soil; and the transportation, handling, storage, and disposal of spent nuclear fuel. (See Note 9 of the Notes to the Condensed Consolidated Financial Statements, as well as “Item 1A. Risk Factors” and Note 13 in the 2015 Form 10-K.)

### CONTRACTUAL COMMITMENTS

PG&E Corporation and the Utility enter into contractual commitments in connection with future obligations that relate to purchases of electricity and natural gas for customers, purchases of transportation capacity, purchases of renewable energy, and purchases of fuel and transportation to support the Utility’s generation activities. (See “Purchase Commitments” in Note 9 of the Notes to the Condensed Consolidated Financial Statements). Contractual commitments that relate to financing arrangements include long-term debt, preferred stock, and certain forms of regulatory financing. For more in-depth discussion about PG&E Corporation’s and the Utility’s contractual commitments, see “Liquidity and Financial Resources” above and Management’s Discussion and Analysis of Financial Condition and Results of Operations – Contractual Commitments in the 2015 Form 10-K.

### Off-Balance Sheet Arrangements

PG&E Corporation and the Utility do not have anyoff-balance sheet arrangements that have had, or are reasonably likely to have, a current or future material effect on their financial condition, changes in financial condition, revenues or expenses, results of operations, liquidity, capital expenditures, or capital resources, other than those discussed in Note 13 of the Notes to the Consolidated Financial Statements in the 2015 Form 10-K (the Utility’s commodity purchase agreements).

### RISK MANAGEMENT ACTIVITIES

PG&E Corporation, mainly through its ownership of the Utility, and the Utility are exposed to market risk, which is the risk that changes in market conditions will adversely affect net income or cash flows. PG&E Corporation and the Utility face market risk associated with their operations; their financing arrangements; the marketplace for electricity, natural gas, electric transmission, natural gas transportation, and storage; emissions allowances and offset credits, other goods and services; and other aspects of their businesses. PG&E Corporation and the Utility categorize market risks as “price risk” and “interest rate risk.” The Utility is also exposed to “credit risk,” the risk that counterparties fail to perform their contractual obligations.

The Utility actively manages market risk through risk management programs designed to support business objectives, discourage unauthorized risk-taking, reduce commodity cost volatility, and manage cash flows. The Utility uses derivative instruments only for non-trading purposes (i.e., risk mitigation) and not for speculative purposes. The Utility’s risk management activities include the use of physical and financial instruments such as forward contracts, futures, swaps, options, and other instruments and agreements, most of which are accounted for as derivative instruments. Some contracts are accounted for as leases. The Utility manages credit risk associated with its counterparties by assigning credit limits based on evaluations of their financial conditions, net worth, credit ratings, and other credit criteria as deemed appropriate. Credit limits and credit quality are monitored periodically. These activities arediscussed in detail in the 2015 Form 10-K. There were no significant developments to the Utility and PG&E Corporation’s risk management activities during the three months ended March 31, 2016.

### CRITICAL ACCOUNTING POLICIES

The preparation of the Condensed Consolidated Financial Statements in accordance with GAAP involves the use of estimates and assumptions that affect the recorded amounts of assets and liabilities as of the date of the Condensed Consolidated Financial Statements and the reported amounts of revenues and expenses during the reporting period. PG&E Corporation and the Utility consider their accounting policies for regulatory assets and liabilities, loss contingencies associated with environmental remediation liabilities and legal and regulatory matters, asset retirement obligations, and pension and other postretirement benefits plans to be critical accounting policies. These policies are considered critical accounting policies due, in part, to their complexity and because their application is relevant and material to the financial position and results of operations of PG&E Corporation and the Utility, and because these policies require the use of material judgments and estimates. Actual results may differ materially from these estimates. These accounting policies and their key characteristics are discussed in detail in the 2015Form 10-K.

### ACCOUNTING STANDARDS ISSUED BUT NOT YET ADOPTED

See the discussion above in Note 2 of the Notes to the Condensed Consolidated Financial Statements.

### CAUTIONARY LANGUAGE REGARDING FORWARD-LOOKING STATEMENTS

This report contains forward-looking statements that are necessarily subject to various risks and uncertainties. These statements reflect management’s judgment and opinions which are based on current estimates, expectations, and projections about future events and assumptions regarding these events and management's knowledge of facts as of the date of this report. These forward-looking statements relate to, among other matters, estimated losses, including penalties and fines, associated with various investigations and proceedings; forecasts of pipeline-related expenses that the Utility will not recover through rates; forecasts of capital expenditures; estimates and assumptions used in critical accounting policies, including those relating to regulatory assets and liabilities, environmental remediation, litigation, third-party claims, and other liabilities; and the level of future equity or debt issuances. These statements are also identified by words such as “assume,” “expect,” “intend,” “forecast,” “plan,” “project,” “believe,” “estimate,” “predict,” “anticipate,” “may,” “should,” “would,” “could,” “potential” and similar expressions. PG&E Corporation and the Utility are not able to predict all the factors that may affect future results. Some of the factors that could cause future results to differ materially from those expressed or implied by the forward-looking statements, or from historical results, include, but are not limited to:

the timing and outcomes of the 2015 GT&S rate case, the 2017 GRC, the TO rate cases, and other ratemaking and regulatory proceedings;

the timing and outcomes of the federal criminal prosecution of the Utility, the pending CPUC investigation of the Utility’s natural gas distribution record-keeping practices, the SED’s unresolved enforcement matters relating to the Utility’s compliance with natural gas-related laws and regulations, and the other investigations that have been or may be commenced relating to the Utility’s compliance with natural gas-related laws and regulations, and the ultimate amount of fines, penalties, and remedial costs that the Utility may incur in connection with the outcomes;

the timing and outcome of the CPUC’s investigation of communications between the Utility and the CPUC that may have violated the CPUC’s rules regarding ex parte communications or are otherwise alleged to be improper, whether additional criminal or regulatory investigations or enforcement actions are commenced with respect to allegedly improper communications, and whether such matters negatively affect the final decisions to be issued in the 2015 GT&S rate case or other ratemaking proceedings;

the outcome of the Butte fire litigation, and whether the Utility’s insurance is sufficient to cover the Utility’s liability resulting therefrom, or if insurance is otherwise available; and whether additional investigations and proceedings will be opened

whether PG&E Corporation and the Utility are able to repair the harm to their reputations caused by the criminal prosecution of the Utility, the state and federal investigations of natural gas incidents, matters relating to the indicted case, improper communications between the CPUC and the Utility; and the Utility’s ongoing work to remove encroachments from transmission pipeline rights-of-way;

whether the Utility can control its costs within the authorized levels of spending, the extent to which the Utility incurs unrecoverable costs that are higher than the forecasts of such costs, and changes in cost forecasts or the scope and timing of planned work resulting from changes in customer demand for electricity and natural gas or other reasons;

the amount and timing of additional common stock and debt issuances by PG&E Corporation, including the dilutive impact of common stock issuances to fund PG&E Corporation’s equity contributions to the Utility as the Utility incurs charges and costs, including fines, that it cannot recover through rates;

the outcome of the CPUC’s investigation into the Utility’s safety culture, and future legislative or regulatory actions that may be taken to require the Utility to separate its electric and natural gas businesses, restructure into separate entities, undertake some other corporate restructuring, or implement corporate governance changes;

the outcomes of future investigations or other enforcement proceedings that may be commenced relating to the Utility’s compliance with laws, rules, regulations, or orders applicable to its operations, including the construction, expansion or replacement of its electric and gas facilities; inspection and maintenance practices, customer billing and privacy, and physical and cyber security;

the impact of environmental remediation laws, regulations, and orders; the ultimate amount of costs incurred to discharge the Utility’s known and unknown remediation obligations; and the extent to which the Utility is able to recover environmental costs in rates or from other sources;

58 the ultimate amount of unrecoverable environmental costs the Utility incurs associated with the Utility’s natural gas compressor station site located near Hinkley, California;

the impact of new legislation or NRC regulations, recommendations, policies, decisions, or orders relating to the nuclear industry, including operations, seismic design, security, safety, relicensing, the storage of spent nuclear fuel, decommissioning, cooling water intake, or other issues; the impact of actions taken by state agencies, including the California State Water Resources Board and the California State Lands Commission, that may affect the Utility’s ability to continue operating Diablo Canyon; and whether the Utility decides to resume its pursuit to renew the two Diablo Canyon NRC operating licenses, and if so, whether the licenses are renewed;

the impact of droughts or other weather-related conditions or events, wildfires (such as the Butte fire), climate change, natural disasters, acts of terrorism, war, or vandalism (including cyber-attacks), and other events, that can cause unplanned outages, reduce generating output, disrupt the Utility’s service to customers, or damage or disrupt the facilities, operations, or information technology and systems owned by the Utility, its customers, or third parties on which the Utility relies; whether the Utility incurs liability to third parties for property damage or personal injury caused by such events; and whether the Utility is subject to civil, criminal, or regulatory penalties in connection with such events; and whether the Utility’s insurance coverage is available for these types of claims and whether the amount of insurance is sufficient to cover the Utility’s liability;

how the CPUC and the CARB implement state environmental laws relating to GHG, renewable energy targets, energy efficiency standards, distributed energy resources, electric vehicles, and similar matters, including whether the Utility is able to continue recovering associated compliance costs, such as the cost of emission allowances and offsets under cap-and-trade regulations, and whether the Utility is able to timely recover its associated investment costs;

whether the Utility’s climate change adaptation strategies are successful;

the impact that reductions in customer demand for electricity and natural gas have on the Utility’s ability to make and recover its investments through rates and earn its authorized return on equity, and whether the Utility is successful in addressing the impact of growing distributed and renewable generation resources and changing customer demand for natural gas and electric services;

the supply and price of electricity, natural gas, and nuclear fuel; the extent to which the Utility can manage and respond to the volatility of energy commodity prices; the ability of the Utility and its counterparties to post or return collateral in connection with price risk management activities; and whether the Utility is able to recover timely its electric generation and energy commodity costs through rates, including its renewable energy procurement costs;

whether the Utility’s information technology, operating systems and networks, including the advanced metering system infrastructure, customer billing, financial, records management, and other systems, can continue to function accurately while meeting regulatory requirements; whether the Utility is able to protect its operating systems and networks from damage, disruption, or failure caused by cyber-attacks, computer viruses, or other hazards; whether the Utility’s security measures are sufficient to protect against unauthorized or inadvertent disclosure of information contained in such systems and networks, including confidential proprietary information and the personal information of customers; and whether the Utility can continue to rely on third-party vendors and contractors that maintain and support some of the Utility’s information technology and operating systems;

the amount and timing of charges reflecting probable liabilities for third-party claims; the extent to which costs incurred in connection with third-party claims or litigation can be recovered through insurance, rates, or from other third parties; and whether the Utility can continue to obtain adequate insurance coverage for future losses or claims, especially following a major event that causes widespread third-party losses;

the ability of PG&E Corporation and the Utility to access capital markets and other sources of debt and equity financing in a timely manner on acceptable terms;

changes in credit ratings which could result in increased borrowing costs especially if PG&E Corporation or the Utility were to lose its investment grade credit ratings;

59 the impact of federal or state laws or regulations, or their interpretation, on energy policy and the regulation of utilities and their holding companies, including how the CPUC interprets and enforces the financial and other conditions imposed on PG&E Corporation when it became the Utility’s holding company, and whether the ultimate outcomes of the CPUC’s pending investigations, the criminal prosecution, and other enforcement matters affect the Utility’s ability to make distributions to PG&E Corporation, and, in turn, PG&E Corporation’s ability to pay dividends;

the outcome of federal or state tax audits and the impact of any changes in federal or state tax laws, policies, regulations, or their interpretation; and

the impact of changes in GAAP, standards, rules, or policies, including those related to regulatory accounting, and the impact of changes in their interpretation or application.

For more information about the significant risks that could affect the outcome of these forward-looking statements and PG&E Corporation’s and the Utility’s future financial condition, results of operations, and cash flows, see “Risk Factors” in the 2015 Form 10-K and in Part II, Item. 1A. Risk Factors below. PG&E Corporation and the Utility do not undertake any obligation to update forward-looking statements, whether in response to new information, future events, or otherwise.

## Market risk

As filed, 606 characters.

PG&E Corporation’s and the Utility’s primary market risk results from changes in energy commodity prices. PG&E Corporation and the Utility engage in price risk management activities for non-trading purposes only. Both PG&E Corporation and the Utility may engage in these price risk management activities using forward contracts, futures, options, and swaps to hedge the impact of market fluctuations on energy commodity prices and interest rates. (See the section above entitled “Risk Management Activities” in Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations.)

## Controls and procedures

As filed, 1,562 characters.

Based on an evaluation of PG&E Corporation’s and the Utility’s disclosure controls and procedures as of March 31,2016, PG&E Corporation’s and the Utility’s respective principal executive officers and principal financial officers have concluded that such controls and procedures were effective to ensure that information required to be disclosed by PG&E Corporation and the Utility in reports that the companies file or submit under the Securities Exchange Act of 1934 is recorded, processed, summarized, and reported within the time periods specified in the SEC rules and forms. In addition, PG&E Corporation’s and the Utility’s respective principal executive officers and principal financial officers have concluded that such controls and procedures were effective in ensuring that information required to be disclosed by PG&E Corporation and the Utility in the reports that PG&E Corporation and the Utility file or submit under the Securities Exchange Act of 1934 is accumulated and communicated to PG&E Corporation’s and the Utility’s management, including PG&E Corporation’s and the Utility’s respective principal executive officers and principal financial officers, or persons performing similar functions, as appropriate to allow timely decisions regarding required disclosure.

There were no changes in internal control over financial reporting that occurred during the quarter ended March 31,2016, that have materially affected, or are reasonably likely to materially affect, PG&E Corporation’s or the Utility’s internal control over financial reporting.

## Risk factors

As filed, 2,810 characters.

For information about the significant risks that could affect PG&E Corporation’s and the Utility’s future financial condition, results of operations, and cash flows, see the section of the 2015 Form 10-K entitled “Risk Factors,” as supplemented below, and the section of this quarterly report entitled “Cautionary Language Regarding Forward-Looking Statements.”

***PG&E Corporation and the Utility may incur material liability in connection with the Butte fire.***

On April 28, 2016, Cal Fire released its report of the investigation of the origin and cause of the “Butte fire,” the wildfire that ignited and spread in Amador and Calaveras Counties in Northern California in September 2015. Cal Fire’s report concluded that the wildfire was caused when a Gray Pine tree contacted an electric line of the Utility, which ignited portions of the tree, and determined that the failure by the Utility and its vegetation management contractors to identify certain potential hazards during its vegetation management program ultimately led to the failure of the tree. In a press release also issued on April 28, 2016, Cal Fire indicated that it will seek to recover firefighting costs in excess of $90 million from the Utility.

In connection with the Butte fire, approximately 32 complaints have been filed to date against the Utility and its vegetation management contractors in the Superior Court of California in both the County of Calaveras and the County of San Francisco, involving approximately 1,300 individual plaintiffs and their insurance companies. The number of complaints may increase in the future. PG&E Corporation’s and the Utility’s financial statements for the period ended March 31, 2016 reflect a provision of $350 million for property damages in connection with this matter. This amount is based on estimates about the number, size, and type of structures damaged or destroyed, and assumptions about the contents of such structures and other property damage. A change in management’s estimates or assumptions could result in an adjustment that could have a material impact on PG&E Corporation’s and the Utility’s financial condition and results of operations during the period in which such change occurred. The Utility also could incur material charges related to fire suppression, personal injury damages and other damages.

The Utility has insurance coverage for third party claims. If the amount of insurance is insufficient to cover such losses, or if insurance is otherwise unavailable, PG&E Corporation’s and the Utility’s financial condition, results of operations, or cash flows could be materially affected.

The Utility also could be subject to material fines, or penalties or disallowances if the CPUC or other law enforcement agency brought enforcement action against the Utility.

Filed May 4, 2016.
Source: SEC EDGAR, the filing index for accession 0001004980-16-000073. Last ingested by Listed: Nov 14, 2026, 23:58 ET. No prices; not investment advice.