## Figures reported in this filing

Standardized XBRL line items for the period ended 2016-06-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2016-04-01 to 2016-06-30 | $4.17bn | us-gaap:Revenues |
| Revenue | 6 months, 2016-01-01 to 2016-06-30 | $8.14bn | us-gaap:Revenues |
| Operating income | 3 months, 2016-04-01 to 2016-06-30 | $401.0m | us-gaap:OperatingIncomeLoss |
| Operating income | 6 months, 2016-01-01 to 2016-06-30 | $496.0m | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2016-04-01 to 2016-06-30 | $207.0m | us-gaap:InterestExpense |
| Interest expense | 6 months, 2016-01-01 to 2016-06-30 | $410.0m | us-gaap:InterestExpense |
| Income tax | 3 months, 2016-04-01 to 2016-06-30 | $12.0m | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 6 months, 2016-01-01 to 2016-06-30 | −$175.0m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2016-04-01 to 2016-06-30 | $210.0m | us-gaap:ProfitLoss |
| Net income | 6 months, 2016-01-01 to 2016-06-30 | $320.0m | us-gaap:ProfitLoss |
| Diluted EPS | 3 months, 2016-04-01 to 2016-06-30 | $0.41 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 6 months, 2016-01-01 to 2016-06-30 | $0.63 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2016-04-01 to 2016-06-30 | $0.41 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 6 months, 2016-01-01 to 2016-06-30 | $0.63 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2016-04-01 to 2016-06-30 | 498,000,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 6 months, 2016-01-01 to 2016-06-30 | 497,000,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 6 months, 2016-01-01 to 2016-06-30 | $1.78bn | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 6 months, 2016-01-01 to 2016-06-30 | $2.65bn | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Dividends paid | 6 months, 2016-01-01 to 2016-06-30 | $440.0m | us-gaap:PaymentsOfDividendsCommonStock |
| Cash and equivalents | at 2016-06-30 | $189.0m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2016-06-30 | $6.13bn | us-gaap:AssetsCurrent |
| Total assets | at 2016-06-30 | $65.93bn | us-gaap:Assets |
| Current liabilities | at 2016-06-30 | $6.65bn | us-gaap:LiabilitiesCurrent |
| Long-term debt | at 2016-06-30 | $16.52bn | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2016-06-30 | $160.0m | us-gaap:LongTermDebtCurrent |
| Short-term borrowings | at 2016-06-30 | $1.53bn | us-gaap:ShortTermBorrowings |
| Shareholders' equity | at 2016-06-30 | $16.75bn | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 101,783 characters.

### RESULTS OF OPERATIONS

### OVERVIEW

PG&E Corporation is a holding company whose primary operating subsidiary is Pacific Gas and Electric Company, a public utility operating in northern and central California. The Utility generates revenues mainly through the sale and delivery of electricity and natural gas to customers.

The Utility is regulated primarily by the CPUC and the FERC. The CPUC has jurisdiction over the rates and terms and conditions of service for the Utility’s electricity and natural gas distribution operations, electric generation, and natural gas transportation and storage. The FERC has jurisdiction over the rates and terms and conditions of service governing the Utility’s electric transmission operations and interstate natural gas transportation contracts. The NRC oversees the licensing, construction, operation, and decommissioning of the Utility’s nuclear generation facilities. The Utility is alsosubject to the jurisdiction of other federal, state, and local governmental agencies.

This is a combined quarterly report of PG&E Corporation and the Utility and should be read in conjunction with each company’s separate Condensed Consolidated Financial Statements and the Notes to the Condensed Consolidated Financial Statements included in this quarterly report. It should also be read in conjunction with the 2015 Form 10-K.

### Summary of Changes in Net Income and Earnings per Share

The following table is a summary reconciliation of the key changes, after-tax, in PG&E Corporation’s income available for common shareholders and EPS (as well as earnings from operations and EPS on an earnings from operations basis) compared to the same period in the prior year (see “Results of Operations” below). “Earnings from operations” is a non-GAAP financial measure and is calculated as income available for common shareholders less items impacting comparability. “Items impacting comparability” represent items that management does not consider part of the normal course of operations and affect comparability of financial results between periods, including certain pipeline related expenses, certain legal and regulatory related expenses, fines and penalties, Butte fire related costs, and impacts of the 2015 GT&S rate case. PG&E Corporation uses earnings from operations to understand and compare operating results across reporting periods for various purposes including internal budgeting and forecasting, short- and long-term operating planning, and employee incentive compensation. PG&E Corporation believes that earnings from operations provide additional insight into the underlying trends of the business allowing for a better comparison against historical results and expectations for future performance. Earnings from operations are not a substitute or alternative for GAAP measures such as income available for common shareholders and may not be comparable to similarly titled measures used by other companies.

*(in millions, except per share amounts)*

|  | Three Months Ended June 30, Earnings (1) | EPS (Diluted) | Six Months Ended June 30, Earnings (1) | EPS (Diluted) |
| --- | ---: | ---: | ---: | ---: |
| **Income Available for Common Shareholders - June 30, 2015** | **$402** | **$0.83** | **$433** | **$0.90** |
| Fines and penalties (2) | 44 | 0.09 | 413 | 0.85 |
| Pipeline-related expenses (3) | 9 | 0.02 | 19 | 0.04 |
| Legal and regulatory related expenses (4) | 10 | 0.02 | 18 | 0.04 |
| Natural gas matters insurance recoveries | (23) | (0.05) | (23) | (0.05) |
| **Earnings from Operations - June 30, 2015 (5)** | **$442** | **$0.91** | **$860** | **$1.78** |
| Growth in rate base earnings | 25 | 0.05 | 51 | 0.10 |
| Timing of taxes (6) | (41) | (0.08) | (81) | (0.16) |
| Nuclear refueling outage | (30) | (0.06) | (30) | (0.06) |
| Regulatory and legal matters | (23) | (0.05) | (23) | (0.05) |
| Gain on disposition of SolarCity stock (7) | - | - | (14) | (0.03) |
| Increase in shares outstanding | - | (0.03) | - | (0.05) |
| Miscellaneous | (43) | (0.08) | (26) | (0.05) |
| **Earnings from Operations - June 30, 2016 (5)** | **$330** | **$0.66** | **$737** | **$1.48** |
| Butte fire related costs (net of insurance) (8) | 125 | 0.25 | (101) | (0.20) |
| Fines and penalties (2) | (112) | (0.22) | (163) | (0.32) |
| Pipeline-related expenses (3) | (16) | (0.03) | (29) | (0.06) |
| Legal and regulatory related expenses (4) | (8) | (0.02) | (18) | (0.04) |
| GT&S capital disallowance (9) | (113) | (0.23) | (113) | (0.23) |
| **Income Available for Common Shareholders - June 30, 2016** | **$206** | **$0.41** | **$313** | **$0.63** |

(1) All amounts presented in the table above are tax-adjusted at PG&E Corporation’s combined statutory tax rate of 40.75%, unless otherwise noted.

(2) Represents the impact of the Penalty Decision (see Note 9 of the Notes to the Condensed Consolidated Financial Statements). For the three and six months ended June 30, 2016, the Utility incurred costs of $148 million pre-tax (before tax impact of $60 million) and $235 million pre-tax (before tax impact of $96 million), respectively for disallowed capital charges. In addition, for the three and six months ended June 30, 2016, the Utility accrued fines of $24 million, which are not deductible for tax purposes, in connection with the POD in the CPUC’s investigation regarding natural gas distribution facilities record-keeping practices.

(3) The Utility incurred costs of $27 million pre-tax (before tax impact of $11 million) and $49 million pre-tax (before tax impact of $20 million), during the three and six months ended June 30, 2016, respectively, for pipeline related expenses incurred in connection with the multi-year effort to identify and remove encroachments from transmission pipeline rights of way.

(4) The Utility incurred costs of $14 million pre-tax (before tax impact of $6 million) and $31 million pre-tax (before tax impact of $13 million), during the three and six months ended June 30, 2016, respectively, for legal and regulatory related expenses incurred in connection with various enforcement, regulatory, and litigation activities regarding natural gas matters and regulatory communications.

(5) “Earnings from operations” is not calculated in accordance with GAAP and excludes the items impacting comparability shown in Notes (2), (3), (4), (8) and (9).

(6) Represents the timing of taxes reportable in quarterly financial statements.

(7) Represents the gain recognized during the six months ended June 30, 2015. No comparable gain was recognized in 2016.

(8) The Utility accrued charges of $0 million and $350 million pre-tax (before tax impact of $143 million), for the three and six months ended June 30, 2016, respectively, related to estimated property damages in connection with the Butte fire, partially offset by approximately $260 million pre-tax (before tax impact of $106 million) accrued as probable insurance recoveries. The Utility also incurred charges of $49 million pre-tax (before tax impact of $20 million) and $80 million pre-tax (before tax impact of $32 million), for the three and six months ended June 30, 2016, respectively, for Utility clean-up, repair, and legal costs associated with the Butte fire.

(9) Represents charges of $190 million pre-tax (before tax impact of $77 million) of probablecapitaldisallowancesas a result of thephase one 2015 GT&S rate case decision that the Utility incurred in the three and six months ended June 30, 2016, including $134 million pre-tax (before tax impact of $54 million) for 2011 through 2014 capital expenditures in excess of adopted amounts and $56 million pre-tax (before tax impact of $23 million) for the Utility’s estimate of 2015 through 2018 capital expenditures that are probable of exceeding authorized amounts. (See “Regulatory Matters” below for more information.)

### Key Factors Affecting Financial Results

PG&E Corporation and the Utility believe that their future results of operations, financial condition, and cash flows will be materially affected by the following factors:

- *The Outcome of Enforcement, Litigation, and Regulatory Matters.* Future financial results will be impacted by the unrecoverable pipeline safety-related and remedies costs required by the Penalty Decision. (For more information about the Penalty Decision, see Note 9 of the Notes to the Condensed Consolidated Financial Statements.) The Utility’s future results may also be impacted by various other pending enforcement, litigation and regulatory actions, including but not limited to those related to the federal criminal charges and CPUC investigations of the Utility’s compliance with natural gas distribution facilities record-keeping practices, potential violations of the CPUC’s ex parte communication rules, and the Butte fire. (See Note 9 of the Notes to the Condensed Consolidated Financial Statements in Item 1.)
- *The Timing and Outcome of Ratemaking Proceedings.* The CPUC approved 2015 GT&S “interim” revenue requirements in its phase one decision dated June 23, 2016. The authorized revenue requirements are effective retroactive to January 1, 2015. However, the Utility will not be able to record the revenue requirement increase since January 1, 2015 until after the final phase two decision is issued. The final phase two decision will allocate the $850 million of shareholder funded safety work related to the Penalty Decision and as a result, reduce revenue requirements in this rate case. (See “Regulatory Matters – 2015 Gas Transmission and Storage Rate Case” below for more information.) Additionally, in May 2016, the Utility updated its 2017 GRC application to request that the CPUC authorize a revenue requirement increase of $319 million for 2017 for the Utility’s electric generation business and its electric and natural gas distribution businesses with attrition increases in 2018 and 2019. In order to allow settlement discussions to proceed, the procedural schedule for this case has been updated calling for a final decision in early 2017, if a settlement has not been reached before then. A settlement conference is currently scheduled for August 3, 2016. (See “Regulatory Matters − 2017 General Rate Case” below for more information.) The outcome of regulatory proceedings can be affected by many factors, including the level of opposition by intervening parties, potential rate impacts, the Utility’s reputation, the regulatory and political environments, and other factors.
- *The Ability of the Utility to Control and Recover Operating Costs and Capital Expenditures.* The Utility’s ability to earn its authorized rate of return could be materially affected if actual costs differ from the amounts authorized in the rate case decisions. In addition to incurring shareholder-funded safety costs and costs associated with remedial measures required by the Penalty Decision, the Utility also forecasts that in 2016 it will incur unrecovered pipeline-related expenses ranging from $100 million to $150 million which primarily relate to costs to identify and remove encroachments from transmission pipeline rights-of-way. Also, the June 23, 2016 phase one CPUC decision in the Utility’s 2015 GT&S rate case establishes various cost caps that will increase the risk of overspend over the current rate case cycle. The ultimate amount of unrecovered costs also could be affected by how the CPUC determines which costs are included in determining whether the $850 million shareholder-funded obligation under the Penalty Decision has been met, and the outcome of pending and future investigations and enforcement matters. (See Note 9 of the Notes to the Condensed Consolidated Financial Statements in Item 1.) The Utility’s ability to recover costs in the future also could be affected by decreases in customer demand. (See “Forward-Looking Statements” below for more information.)

42

- *The Amount and Timing of the Utility’s Financing Needs.* PG&E Corporation contributes equity to the Utility as needed to maintain the Utility’s CPUC-authorized capital structure. For the six months ended June 30, 2016, PG&E Corporation issued $299 million of common stock and used $280 million of the cash proceeds to make equity contributions to the Utility. PG&E Corporation forecasts that it will continue issuing a material amount of equity in 2016 and future years to support the Utility’s capital expenditures. PG&E Corporation will issue additional equity to fund charges incurred by the Utility to comply with the Penalty Decision, to fund unrecoverable pipeline-related expenses, and to pay fines and penalties that may be required by the final outcomes of pending enforcement matters. These additional issuances would have a material dilutive impact on PG&E Corporation’s EPS. PG&E Corporation’s and the Utility’s ability to access the capital markets and the terms and rates of future financings could be affected by the outcome of the matters discussed in Note 9 of the Notes to the Condensed Consolidated Financial Statements in Item 1, Financial Statements and Supplementary Data, changes in their respective credit ratings, general economic and market conditions, and other factors.

For more information about the factors and risks that could affect future results of operations, financial condition, and cash flows, or that could cause future results to differ from historical results, see “Item 1A. Risk Factors”in the 2015 Form 10-K and in Part II below under “Item 1A. Risk Factors.” In addition, this quarterly report contains forward-looking statements that are necessarily subject to various risks and uncertainties. These statements reflect management’s judgment and opinions which are based on current estimates, expectations, and projections about future events and assumptions regarding these events and management’s knowledge of facts as of the date of this report. See the section entitled “Forward-Looking Statements” below for a list of some of the factors that may cause actual results to differ materially. PG&E Corporation and the Utility are not able to predict all the factors that may affect future results and do not undertake an obligation to update forward-looking statements, whether in response to new information, future events, or otherwise.

### RESULTS OF OPERATIONS

The consolidated results of operations consist primarily of balances related to the Utility, which are discussed below. The following table provides a summary of net income available for common shareholders for the three and six months ended June 30, 2016 and 2015:

*(in millions)*

|  | Three Months Ended June 30, 2016 | 2015 | Six Months Ended June 30, 2016 | 2015 |
| --- | ---: | ---: | ---: | ---: |
| Consolidated Total | $206 | $402 | $313 | $433 |
| PG&E Corporation | 1 | - | 3 | 30 |
| Utility | $205 | $402 | $310 | $403 |

PG&E Corporation’s net income primarily consists of interest expense on long-term debt, income taxes, and other income from investments. Results for the six months ended June 30, 2015 include approximately $30 million of realized gains and associated tax benefits related to an investment in SolarCity Corporation with no corresponding gains for the same period in 2016.

### Utility

The tables below shows certain items from the Utility’s Condensed Consolidated Statements of Income for the three and six months ended June 30, 2016 and 2015. The tables separately identify the revenues and costs that impacted earnings from those that did not impact earnings. In general, expenses the Utility is authorized to pass through directly to customers (such as costs to purchase electricity and natural gas, as well as costs to fund public purpose programs), and the corresponding amount of revenues collected to recover those pass-through costs, do not impact earnings. In addition, expenses that have been specifically authorized(such as the payment of pension costs) and the corresponding revenues the Utility is authorized to collect to recover such costs, do not impact earnings.

Revenues that impact earnings are primarily those that have been authorized by the CPUC and the FERC to recover the Utility’s costs to own and operate its assets and to provide the Utility an opportunity to earn its authorized rate of return on rate base. Expenses that impact earnings are primarily those that the Utility incurs to own and operate its assets.

The Utility’s operating results for the three and six months ended June 30, 2016 and 2015 reflect charges associated with the impact of the Penalty Decision. (See “Utility Revenues and Costs that Impacted Earnings” below.)

*(in millions)*

|  | Three Months Ended June 30, 2016 Revenues/Costs: That Impacted Earnings | That Did Not Impact Earnings | Total Utility | Three Months Ended June 30, 2015 Revenues/Costs: That Impacted Earnings | That Did Not Impact Earnings | Total Utility |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Electric operating revenues | $1,993 | $1,472 | $3,465 | $1,877 | $1,585 | $3,462 |
| Natural gas operating revenues | 525 | 179 | 704 | 526 | 228 | 754 |
| **Total operating revenues** | **2,518** | **1,651** | **4,169** | **2,403** | **1,813** | **4,216** |
| Cost of electricity | - | 1,156 | 1,156 | - | 1,277 | 1,277 |
| Cost of natural gas | - | 75 | 75 | - | 118 | 118 |
| Operating and maintenance | 1,417 | 420 | 1,837 | 1,065 | 418 | 1,483 |
| Depreciation, amortization, and decommissioning | 700 | - | 700 | 651 | - | 651 |
| **Total operating expenses** | **2,117** | **1,651** | **3,768** | **1,716** | **1,813** | **3,529** |
| **Operating income** | **401** | **-** | **401** | **687** | **-** | **687** |
| Interest income (1) |  |  | 4 |  |  | 3 |
| Interest expense (1) |  |  | (204) |  |  | (189) |
| Other income, net (1) |  |  | 21 |  |  | 20 |
| Income before income taxes |  |  | 222 |  |  | 521 |
| Income tax provision (1) |  |  | 13 |  |  | 115 |
| Net income |  |  | 209 |  |  | 406 |
| Preferred stock dividend requirement (1) |  |  | 4 |  |  | 4 |
| **Income Available for Common Stock** |  |  | **$205** |  |  | **$402** |

(1) These items impacted earnings for the three months ended June 30, 2016 and 2015.

*(in millions)*

|  | Six Months Ended June 30, 2016 Revenues/Costs: That Impacted Earnings | That Did Not Impact Earnings | Total Utility | Six Months Ended June 30, 2015 Revenues/Costs: That Impacted Earnings | That Did Not Impact Earnings | Total Utility |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Electric operating revenues | $3,910 | $2,687 | $6,597 | $3,662 | $2,814 | $6,476 |
| Natural gas operating revenues | 1,048 | 499 | 1,547 | 1,031 | 609 | 1,640 |
| **Total operating revenues** | **4,958** | **3,186** | **8,144** | **4,693** | **3,423** | **8,116** |
| Cost of electricity | - | 2,106 | 2,106 | - | 2,277 | 2,277 |
| Cost of natural gas | - | 297 | 297 | - | 392 | 392 |
| Operating and maintenance | 3,065 | 783 | 3,848 | 2,652 | 754 | 3,406 |
| Depreciation, amortization, and decommissioning | 1,396 | - | 1,396 | 1,282 | - | 1,282 |
| **Total operating expenses** | **4,461** | **3,186** | **7,647** | **3,934** | **3,423** | **7,357** |
| **Operating income** | **497** | **-** | **497** | **759** | **-** | **759** |
| Interest income (1) |  |  | 8 |  |  | 4 |
| Interest expense (1) |  |  | (405) |  |  | (376) |
| Other income, net (1) |  |  | 45 |  |  | 46 |
| Income before income taxes |  |  | 145 |  |  | 433 |
| Income tax (benefit) provision (1) |  |  | (172) |  |  | 23 |
| Net income |  |  | 317 |  |  | 410 |
| Preferred stock dividend requirement (1) |  |  | 7 |  |  | 7 |
| **Income Available for Common Stock** |  |  | **$310** |  |  | **$403** |

(1) These items impacted earnings for the six months ended June 30, 2016 and 2015.

### Utility Revenues and Costs that Impacted Earnings

The following discussion presents the Utility’s operating results for the three and six months ended June 30, 2016 and 2015, focusing on revenues and expenses that impacted earnings for these periods.

The Utility has received a final phase one decision in its 2015 GT&S rate case. However, the Utility will not be able to recognize the full impact until the CPUC issues a final phase two decision in this rate case. Any revenue requirement increase the CPUC may authorize in the GT&S rate case would be retroactive to January 1, 2015. In addition, accounting rules preclude the Utility from recording the full amount of the revenue requirement increase until 2017.(See “Regulatory Matters” below.)

#### Operating Revenues

The Utility’s electric and natural gas operating revenues that impacted earnings increased by $115 million, or 5%, and by $265 million, or 6%, in the three and six months ended June 30, 2016, compared to the same periods in 2015 primarily due to additional base revenues as authorized by the CPUC in the 2014 GRC decision and by the FERC in the TO rate case. (See “Regulatory Matters” below.)

#### Operating and Maintenance

The Utility’s operating and maintenance expenses that impacted earnings increased by $352 million, or 33%, in the three months ended June 30, 2016 compared to the same period in 2015 primarily due to $190 million in permanently disallowed capital spending in the final phase one 2015 GT&S rate case decision (see “Regulatory Matters” below), $73 million of higher disallowed capital charges related to the Penalty Decision, $50 million in costs related to a scheduled nuclear refueling outage at Diablo Canyon that occurred during the three months ended June 30, 2016, $49 million in charges related to the Butte fire, a $24 million charge recorded in connection with the POD related to the natural gas distribution facilities record-keeping investigation, and other expenses related to timing differences. These increases were partially offset by approximately $260 million in probable insurance recoveries related to the Butte fire recorded in the three months ended June 30, 2016 with no corresponding activity for the same period in 2015. (See Note 9 of the Notes to the Condensed Consolidated Financial Statements.)

The Utility’s operating and maintenance expenses that impacted earnings increased by $413 million, or 16%, in the six months ended June 30, 2016 compared to the same period in 2015 primarily due to $430 million in charges related to the Butte fire, $190 million in permanently disallowed capital spending in the final phase one 2015 GT&S rate case decision (see “Regulatory Matters” below), $107 million of higher disallowed capital charges related to the Penalty Decision, $50 million in costs related to a scheduled nuclear refueling outage at Diablo Canyon that occurred during the three months ended June 30, 2016, a $24 million charge recorded in connection with the POD related to the natural gas distribution facilities record-keeping investigation, and other expenses related to timing differences. These increases were partially offset by $500 million in charges associated with the Penalty Decision for fines and customer refunds incurred in the first six months of 2015 with no corresponding charges in 2016. Additionally, the Utility recorded approximately $260 million in probable insurance recoveries related to the Butte fire in the three months ended June 30, 2016 with no corresponding activity for the same period in 2015. (See Note 9 of the Notes to the Condensed Consolidated Financial Statements.)

The Utility’s future financial statements will continue to be impacted by additional charges associated with the Penalty Decision, costs related to the Butte Fire, and unrecoverable pipeline-related expenses. (See “Key Factors Affecting Financial Results” above and Note 9 of the Notes to the Condensed Consolidated Financial Statements.)

#### Depreciation, Amortization, and Decommissioning

The Utility’s depreciation, amortization, and decommissioning expenses increased by $49 million, or 8%, and by $114 million, or 9%, in the three and six months ended June 30, 2016 compared to the same periods in 2015. These increases were primarily due to the impact of capital additions as authorized by the CPUC in the 2014 GRC decision as well as higher capital additions and higher depreciation rates as authorized by the FERC in the TO rate case.

#### Interest Expense

The Utility’s interest expense increased by $15 million, or 8%, and by $29 million, or 8%, in the three and six months ended June 30, 2016 compared to the same periods in 2015. These increases were primarily driven by higher levels of long term debt and short term borrowings in 2016 compared to the same periods in 2015.

#### Interest Income and Other Income, Net

There were no material changes to interest income and other income, net for the periods presented.

#### Income Tax Provision

The income tax provision decreased by $102 million and $195 million in the three and six months ended June 30, 2016 as compared to the same periods in 2015. The following describes the change in the Utility’s effective tax rate for the three and six months ended June 30, 2016 as compared to the same periods in 2015:

- The effective tax rates for the three months ended June 30, 2016 and 2015 were 6% and 22%, respectively. The decrease in the effective tax rate was primarily due to higher benefits resulting from various property-related tax deductions recorded during the three months ended June 30, 2016 with lower comparable amounts in the three month period ending June 30, 2015.
- The effective tax rates for the six months ended June 30, 2016 and 2015 were (119)% and 5%, respectively. The decrease in the effective tax rate was primarily due to higher benefits resulting from various property-related tax deductions recorded during the six months ended June 30, 2016 with lower comparable amounts in the six month period ending June 30, 2015, as well as benefits resulting from various tax audit results recorded during the six months ended June 30, 2016 with no comparable amounts in the six month period ending June 30, 2015.

### Utility Revenues and Costs that did not Impact Earnings

Fluctuations in revenues that did not impact earnings are primarily driven by electricity and natural gas procurement costs. See below for more information.

#### Cost of Electricity

The Utility’s cost of electricity includes the costs of power purchased from third parties (including renewable energy resources), transmission, fuel used in its own generation facilities, fuel supplied to other facilities under power purchase agreements, costs to comply with California’s cap-and-trade program, and realized gains and losses on price risk management activities. (See Note 7 of the Notes to the Condensed Consolidated Financial Statements.)

*(in millions)*

|  | Three Months Ended June 30, 2016 | 2015 | Six Months Ended June 30, 2016 | 2015 |
| --- | ---: | ---: | ---: | ---: |
| Cost of purchased power | $1,113 | $1,207 | $1,999 | $2,129 |
| Fuel used in own generation facilities | 43 | 70 | 107 | 148 |
| **Total cost of electricity** | **$1,156** | **$1,277** | **$2,106** | **$2,277** |
| Average cost of purchased power per kWh (1) | $0.099 | $0.103 | $0.101 | $0.101 |
| Total purchased power (in millions of kWh) (2) | 11,228 | 11,747 | 19,767 | 21,038 |

(1)Average cost of purchased power for the three and six months ended June 30, 2016 remained relatively flat compared to the same periods in 2015. A higher percentage of renewable energy resources were offset by lower market prices for natural gas.

(2) The decrease in purchased power for the three and six months ended June 30, 2016 resulted from an increase year-to-date in generation from the Utility’s own generation facilities and lower electric customer demand. Hydroelectric generation increased during the three and six months ended June 30, 2016 as compared to the same periods in 2015.

The Utility’s total purchased power is driven by customer demand, the availability of the Utility’s own generation facilities (including the Diablo Canyon nuclear generation power plant and hydroelectric plants), and the cost-effectiveness of each source of electricity.

#### Cost of Natural Gas

The Utility’s cost of natural gas includes the costs of procurement, storage, transportation of natural gas, costs to comply with California’s cap-and-trade program, and realized gains and losses on price risk management activities. (See Note 7 of the Notes to the Condensed Consolidated Financial Statements.) The Utility’s cost of natural gas is impacted by the market price of natural gas, changes in the cost of storage and transportation, and changes in customer demand.

*(in millions)*

|  | Three Months Ended June 30, 2016 | 2015 | Six Months Ended June 30, 2016 | 2015 |
| --- | ---: | ---: | ---: | ---: |
| Cost of natural gas sold | $44 | $83 | $225 | $317 |
| Transportation cost of natural gas sold | 31 | 35 | 72 | 75 |
| **Total cost of natural gas** | **$75** | **$118** | **$297** | **$392** |
| Average cost per Mcf (1) of natural gas sold (2) | $1.16 | $2.18 | $1.91 | $2.88 |
| Total natural gas sold (in millions of Mcf) (1) | 38 | 38 | 118 | 110 |
| (1) One thousand cubic feet |  |  |  |  |

(2) Average cost of natural gas sold primarily impacted by a decline in the market price of natural gas in the three and six months ended June 30, 2016 compared to the same periods in 2015.

#### Operating and Maintenance Expenses

The Utility’s operating expenses also include certain recoverable costs that the Utility incurs as part of its operations such as pension contributions and public purpose programs costs. If the Utility were to spend over authorized amounts, these expenses could have an impact on earnings.

### LIQUIDITY AND FINANCIAL RESOURCES

### Overview

The Utility’s ability to fund operations, finance capital expenditures, and make distributions to PG&E Corporation depends on the levels of its operating cash flows and access to the capital and credit markets. The CPUC authorizes the Utility’s capital structure, the aggregate amount of long-term and short-term debt that the Utility may issue, and the revenue requirements the Utility is able to collect to recover its cost of capital. The Utility generally utilizes equity contributions from PG&E Corporation and long-term senior unsecured debt issuances to maintain its CPUC-authorized capital structure consisting of 52% equity and 48% debt and preferred stock. The Utility relies on short-term debt, including commercial paper, to fund temporary financing needs.

PG&E Corporation’s ability to fund operations, make scheduled principal and interest payments, fund equity contributions to the Utility, and pay dividends, primarily depends on the level of cash distributions received from the Utility and PG&E Corporation’s access to the capital and credit markets. PG&E Corporation has material stand-alone cash flows related to the issuance of equity and long-term debt, dividend payments, and issuances and repayments under its revolving credit facility and commercial paper program. PG&E Corporation relies on short-term debt, including commercial paper, to fund temporary financing needs.

PG&E Corporation’s equity contributions to the Utility are funded primarily through common stock issuances. PG&E Corporation forecasts that it will issue approximately $800 million in common stock during 2016, primarily to fund equity contributions to the Utility. The Utility’s equity needs will continue to be affected by charges incurred to comply with the Penalty Decision, by the timing and outcome of the final phase two decision in the 2015 GT&S rate case, by unrecoverable pipeline-related expenses, and by fines and penalties that may be imposed in connection with the matters described in “Enforcement and Litigation Matters” below. Common stock issuances by PG&E Corporation to fund these needs would have a material dilutive impact on PG&E Corporation’s EPS.

### Cash and Cash Equivalents

Cash and cash equivalents consist of cash and short-term, highly liquid investments with original maturities of three months or less. PG&E Corporation and the Utility maintain separate bank accounts and primarily invest their cash in money market funds. In addition to cash and cash equivalents, the Utility holds restricted cash that primarily consists of cash held in escrow pending the resolution of the remaining disputed claims that were filed in the Utility’s reorganization proceedings under Chapter 11 of the U.S. Bankruptcy Code. (See “Resolution of Remaining Chapter 11 Disputed Claims” in Note 9 of the Notes to the Condensed Consolidated Financial Statements.) The Utility is uncertain when and how the remaining disputed claims will be resolved.

### Financial Resources

### Debt and Equity Financings

During the three and six months ended June 30, 2016, PG&E Corporation sold 0.8 million and 2.2 million shares under its February 2015 equity distribution agreement for cash proceeds of $49 million and $123 million, respectively, net of commissions paid of $0.4 million and $1 million, respectively. As of June 30, 2016, the remaining gross sales available under this agreement were $301 million.

PG&E Corporation also issued common stock under the PG&E Corporation 401(k) plan, the Dividend Reinvestment and Stock Purchase Plan, and share-based compensation plans. During the six months ended June 30, 2016, 4 million shares were issued for cash proceeds of $165 million under these plans.

The proceeds from these sales were used for general corporate purposes, including the contribution of equity to the Utility. For the six months ended June 30, 2016, PG&E Corporation made equity contributions to the Utility of $280 million.

In March 2016, the Utility issued $600 million principal amount of 2.95% Senior Notes due March 1, 2026. The proceeds were used for general corporate purposes, including the repayment of a portion of the Utility’s outstanding commercial paper. In addition, in March 2016, the Utility entered into a $250 million floating rate unsecured term loan that matures on February 2, 2017. The proceeds were used for general corporate purposes, including the repayment of a portion of the Utility’s outstanding commercial paper.

### Revolving Credit Facilities and Commercial Paper Program

In June 2016, PG&E Corporation and the Utility each extended the termination dates of their existing revolving credit facilities by one year from April 27, 2020 to April 27, 2021. At June 30, 2016, PG&E Corporation and the Utility had $300 million and $1.7 billion available under their respective $300 million and $3.0 billion revolving credit facilities. (See Note 4 of the Notes to the Condensed Consolidated Financial Statements.)

PG&E Corporation and the Utility can issue commercial paper up to the maximum amounts of $300 million and $1.75 billion, respectively. For the six months ended June 30, 2016, PG&E Corporation and the Utility had an average outstanding commercial paper balance of $53 million and $813 million, and a maximum outstanding balance of $176 million and $1.3 billion, respectively. At June 30, 2016, the Utility had an outstanding commercial paper balance of $1.3 billion and PG&E Corporation did not have any commercial paper outstanding.

The revolving credit facilities require that PG&E Corporation and the Utility maintain a ratio of total consolidated debt to total consolidated capitalization of at most 65% as of the end of each fiscal quarter. At June 30, 2016, PG&E Corporation’s and the Utility’s total consolidated debt to total consolidated capitalization was 52% and 51%, respectively. PG&E Corporation’s revolving credit facility agreement also requires that PG&E Corporation own, directly or indirectly, at least 80% of the common stock and at least 70% of the voting capital stock of the Utility. In addition, the revolving credit facilities include usual and customary provisions regarding events of default and covenants including covenants limiting liens to those permitted under PG&E Corporation’s and the Utility’s senior note indentures, mergers, and imposing conditions on the sale of all or substantially all of PG&E Corporation’s and the Utility’s assets and other fundamental changes. At June 30, 2016, PG&E Corporation and the Utility were in compliance with all covenants under their respective revolving credit facilities.

### Dividends

The Board of Directors of PG&E Corporation and the Utility have each adopted a new target dividend payout ratio range of 55% to 65% of earnings, with a target to reach a payout ratio of approximately 60% by 2019. Each Board of Directors retains authority to change the respective common stock dividend policy and dividend payout ratio at any time, especially if unexpected events occur that would change its view as to the prudent level of cash conservation. No dividend is payable unless and until declared by the applicable Board of Directors.

In May 2016, the Board of Directors of PG&E Corporation declared quarterly dividends of $0.49 per share, totaling $244 million, of which approximately $239 million was paid on July 15, 2016, to shareholders of record on June 30, 2016.

In May 2016, the Board of Directors of the Utility declared a common stock dividend of $244 million that was paid to PG&E Corporation on June 1, 2016.

In May 2016, the Board of Directors of the Utility declared dividends on its outstanding series of preferred stock, payable on August 15, 2016, to shareholders of record on July 29, 2016.

### Utility Cash Flows

The Utility’s cash flows were as follows:

*(in millions)*

|  | Six Months Ended June 30, 2016 2016 | 2015 |
| --- | ---: | ---: |
| Net cash provided by operating activities | $1,769 | $1,860 |
| Net cash used in investing activities | (2,686) | (2,486) |
| Net cash provided by financing activities | 978 | 719 |
| **Net change in cash and cash equivalents** | **$61** | **$93** |

49

### Operating Activities

The Utility’s cash flows from operating activities primarily consist of receipts from customers less payments of operating expenses, other than expenses such as depreciation that do not require the use of cash. During the six months ended June 30, 2016, net cash provided by operating activities decreased by $91 million compared to the same period in 2015. This decrease was primarily due to the shareholder-funded bill credit of $400 million, as required by the Penalty Decision, which was refunded to natural gas customers in the second quarter of 2016. This decrease was partially offset by state income tax refunds received in 2016.

Future cash flow from operating activities will be affected by various factors, including:

- the timing and amounts of fines or penalties that may be imposed in connection with the criminal prosecution of the Utility and the remaining investigations and other enforcement and litigation matters (see Note 9 of the Notes to the Condensed Consolidated Financial Statements);
- the timing and outcome of ratemaking proceedings, including of a final phase two decision in the 2015 GT&S rate case and of the 2017 GRC;
- the timing and amount of costs the Utility incurs, but does not recover, associated with its natural gas system (including costs to implement remedial measures and $850 million to pay for designated pipeline safety projects and programs, as required by the Penalty Decision);
- the timing and amount of tax payments (including the bonus depreciation), tax refunds, net collateral payments, and interest payments; and
- the timing of the resolution of the Chapter 11 disputed claims and the amount of principal and interest on these claims that the Utility will be required to pay.

### Investing Activities

Net cash used in investing activities increased by $200 million during the six months ended June 30, 2016 as compared to the same period in 2015. The Utility’s investing activities primarily consist of construction of new and replacement facilities necessary to provide safe and reliable electricity and natural gas services to its customers. Cash used in investing activities also includes the proceeds from sales of nuclear decommissioning trust investments which are largely offset by the amount of cash used to purchase new nuclear decommissioning trust investments. The funds in the decommissioning trusts, along with accumulated earnings, are used exclusively for decommissioning and dismantling the Utility’s nuclear generation facilities.

Future cash flows used in investing activities are largely dependent on the timing and amount of capital expenditures. The Utility estimates that it will incur approximately $5.6 billion in capital expenditures in 2016 and between $5.4 billion and $6.4 billion in 2017.

### Financing Activities

During the six months ended June 30, 2016, net cash provided by financing activities increased by $259 million compared to the same period in 2015. Cash provided by or used in financing activities is driven by the Utility’s financing needs, which depend on the level of cash provided by or used in operating activities, the level of cash provided by or used in investing activities, the conditions in the capital markets, and the maturity date of existing debt instruments. The Utility generally utilizes long-term debt issuances and equity contributions from PG&E Corporation to maintain its CPUC-authorized capital structure, and relies on short-term debt to fund temporary financing needs.

### ENFORCEMENT AND LITIGATION MATTERS

PG&E Corporation and the Utility have significant contingencies arising from their operations, including contingencies related to the enforcement and litigation matters described in Note 9 in the Condensed Consolidated Financial Statements. The outcome of these matters, individually or in the aggregate, could have a material effect on PG&E Corporation’s and the Utility’s future financial results. In addition, PG&E Corporation and the Utility are involved in other enforcement and litigation matters described in the 2015 Form 10-K and Part II. Other Information, Item 1. Legal Proceedings. Significant regulatory developments that have occurred since the 2015 Form 10-K was filed with the SEC are discussed below.

### Department of Interior Inquiry

In September 2015, the Utility was notified that the DOI had initiated an inquiry into whether the Utility should be suspended or debarred from entering into federal procurement and non-procurement contracts and programs citing the allegations contained in the superseding federal criminal indictment discussed in Note 9 of the Notes to the Condensed Consolidated Financial Statements. The Utility filed its initial response on November 2, 2015 to demonstrate that it is a “presently responsible” contractor under federal procurement regulations and that it believes suspension or debarment is not appropriate. On April 8, 2016, the Utility received a series of follow-up questions from the DOI regarding the Utility’s November 2015 submission. The Utility continues to fully cooperate with the DOI and expects to start providing responses to these follow-up questions beginning in August 2016. It is uncertain when or if further action will be taken by DOI following the Utility’s response.

### Litigation Related to the San Bruno Accident and Natural Gas Spending

As of June 30, 2016, there were seven purported derivative lawsuits seeking recovery on behalf of PG&E Corporation and the Utility for alleged breaches of fiduciary duty by officers and directors, among other claims.

Four of the complaints were consolidated as the *San Bruno Fire Derivative Cases* and are pending in the Superior Court of California, County of San Mateo. The remaining three cases are *Tellardin v. PG&E Corp. et al., Iron Workers Mid-South Pension Fund v. Johns, et al.,* and *Bushkin v. Rambo et al.*

On December 8, 2015, the California Court of Appeal issued a writ of mandate to the Superior Court of California, San Mateo County, ordering the court to stay all proceedings in the four consolidated *San Bruno Fire Derivative Cases* pending conclusion of the federal criminal proceedings against the Utility.

*Bushkin v. Rambo et al*., pending in the United States District Court for the Northern District of California, has been designated by the plaintiff as related to the pending shareholder derivative suit *Iron Workers Mid-South Pension Fund v. Johns, et al.*, discussed below. The plaintiff in the *Bushkin* lawsuit has agreed that this case should be stayed pending conclusion of the federal criminal proceedings against the Utility and, on May 3, 2016, the judge entered a stipulated order staying the case. The order also provides that the parties should meet and confer within 30 days after the criminal trial concludes and provide the court a status update. Despite the stay of his complaint, on June 20, 2016 the *Bushkin* plaintiff filed a petition in the Superior Court of California, San Francisco County, seeking to enforce the plaintiff’s claimed right as a shareholder to inspect certain PG&E Corporation accounting books and records pursuant to section 1601 of the California Corporations Code. On July 25, 2016, PG&E Corporation filed a motion to stay plaintiff’s petition until the appellate stay of the San Bruno Fire Derivative Cases has been lifted, or, in the alternative, a demurrer asking the Court to dismiss plaintiff’s petition.

The *Iron Workers* action pending in the United States District Court for the Northern District of California has been stayed pending the resolution of the *San Bruno Fire Derivative Cases.* On May 5, 2016, the court ordered the parties to meet and confer within 30 days after the criminal trial concludes and provide the court a status update.

A case management conference in the action entitled *Tellardin v. PG&E Corp. et al.,* also pending in the Superior Court of California, San Mateo County, is currently set for August 9, 2016.

PG&E Corporation and the Utility are uncertain when and how the above lawsuits will be resolved.

### REGULATORY MATTERS

The Utility is subject to substantial regulation by the CPUC, the FERC, the NRC and other federal and state regulatory agencies. Significant regulatory developments that have occurred since the 2015 Form 10-K was filed with the SECare discussed below.

### 2017 General Rate Case

In the 2017 GRC, the Utility has requested that the CPUC determine the annual amount of base revenues (or “revenue requirements”) that the Utility will be authorized to collect from customers from 2017 through 2019 to recover its anticipated costs for electric distribution, natural gas distribution, and electric generation operations and to provide the Utility an opportunity to earn its authorized rate of return. (The Utility’s revenue requirements for other portions of its operations, such as electric transmission, natural gas transmission and storage services, and electricity and natural gas purchases, are authorized in other regulatory proceedings overseen by the CPUC or the FERC.)

The Utility’s supplemental testimony filed on February 22, 2016, reduced the Utility's previously requested 2017 revenue requirement increase of $457 million (as compared to the 2016 authorized amount of $7.9 billion) to $333 million. In its rebuttal testimony that the Utility submitted to the CPUC on May 27, 2016, the Utility further reduced its 2017 requested revenue requirement by $14 million, to $319 million, representing a $138 million reduction from the original request. The requested increase for 2018 was reduced from $489 million to $467 million, and the requested increase for 2019 was reduced from $390 million to $368 million. The Utility reduced its requested increase primarily to reflect the impact of the five-year extension of the federal tax code provisions regarding bonus depreciation, as well as the tax-deductibility of repair costs.

The table below summarizes the differences between the Utility’s revenue requirement increase proposal (as revised in the Utility’s May 27, 2016 rebuttal testimony), and ORA’s and TURN’s recommendations:

| Year | Utility's Proposal (in millions) | ORA's Recommendation (in millions) Increase / (Decrease) |  | Difference (1) Increase / (Decrease) | TURN's Recommendation (in millions) Increase / (Decrease) |  | Difference (1) Increase/(Decrease) |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| 2017 | $319 | $(85) |  | $(404) | $N/A | (2) | $N/A |
| 2018 | 467 | 274 |  | (193) | 469 |  | 2 |
| 2019 | 368 | 283 |  | (85) | 250 |  | (118) |
| 2020 | N/A | 294 | (3) | N/A | N/A |  | N/A |

(1) Reflects the difference between the Utility’s proposal and the recommendation.

(2) TURN’s proposal does not include a revenue requirement recommendation for 2017.

(3) Reflects ORA’s recommendation to extend the GRC cycle another year.

The following table shows the difference between the Utility’s requested increases in 2017 revenue requirements (as revised in the Utility’s May 27, 2016 rebuttal testimony) and ORA’s recommended amounts by line of business (TURN did not present revenue requirement recommendations by line of business):

*(in millions)*

| Line of Business: | Utility's Proposal |  | ORA's Recommendation Increase / (Decrease) |  | Difference (1) Increase / (Decrease) |
| --- | ---: | ---: | ---: | ---: | ---: |
| Electric distribution | $67 | 1.6% | $(145) | (3.5)% | $(212) |
| Gas distribution | 59 | 3.4 | (59) | (3.4) | (118) |
| Electric generation | 193 | 9.8 | 119 | 6.1 | (74) |
| **Total revenue requirement increases** | **$319** | **4.0%** | **$(85)** | **(1.1)%** | **$(404)** |

(1) Reflects the difference between the Utility’s proposal and ORA’s recommendation.

The following tables show the Utility’s currently requested amounts compared to 2016 authorized amounts:

*(in millions)*

| Line of Business: | Amounts Requested | Amounts Currently Authorized For 2016 | Increase Compared to Currently Authorized Amounts |
| --- | ---: | ---: | ---: |
| Electric distribution | $4,279 | $4,212 | $67 |
| Gas distribution | 1,801 | 1,742 | 59 |
| Electric generation | 2,155 | 1,962 | 193 |
| **Total revenue requirements** | **$8,235** | **$7,916** | **$319** |
| **Cost Category:** |  |  |  |
| (in millions) |  |  |  |
| Operations and maintenance | $1,825 | $1,664 | $161 |
| Customer services | 361 | 319 | 42 |
| Administrative and general | 975 | 1,011 | (36) |
| Less: Revenue credits | (140) | (131) | (9) |
| Franchise fees, taxes other than income, and other adjustments | 184 | 37 | 147 |
| Depreciation (including costs of asset removal), return, and |  |  |  |
| income taxes | 5,030 | 5,016 | 14 |
| **Total revenue requirements** | **$8,235** | **$7,916** | **$319** |

In order to allow settlement discussions to proceed, on June 23, 2016, the CPUC revised the procedural schedule for the 2017 GRC. Under the current schedule, evidentiary hearings will be held in August and September 2016, followed by a proposed decision to be released in January 2017 and a final CPUC decision to be issued in February 2017. On March 17, 2016, the CPUC issued a decision to allow the authorized revenue requirement changes to become effective on January 1, 2017, even if the final decision is issued after that date.

On July 21, 2016, the Utility, together with ORA, TURN, and nearly all other parties active in the proceeding, filed a notice to all parties that a settlement conference in the Utility’s 2017 GRC will be held on August 3, 2016. Such notice is required by the CPUC rules. The settlement conference will be open to all parties in the proceeding and is intended to consider the execution of a settlement agreement.

If the parties are able to reach settlement, the parties would file a motion before the CPUC for approval of a settlement agreement. A settlement agreement would be subject to comments by parties, workshops or hearings, and the CPUC approval. The schedule for such activities would be determined by the CPUC.

PG&E Corporation and the Utility are unable to predict whether the parties will be able to reach a settlement agreement and whether the CPUC will approve such settlement agreement.

For more information, see Item 4 of the 2015 Form 10-K and Item 2 of the 2016 Q1 Form 10-Q.

### 2015 Gas Transmission and Storage Rate Case

On June 23, 2016, the CPUC approved a final decision in phase one of the Utility’s 2015 GT&S rate case. The decision adopts the revenue requirements that the Utility will be authorized to collect through rates beginning August 1, 2016, to recover its costs of gas transmission and storage services for the 2015 GT&S rate case period. In this decision, the CPUC determined it will issue a phase two decision to reduce the authorized revenue requirements after considering comments from parties on the allocation of the $850 million of shareholder funded safety work related to the Penalty Decision, including (1) which programs and projects should be considered safety-related, and (2) whether the percentage of the disallowance that should be applied to capital expenditures as opposed to expense should be changed. (As previously disclosed, the Penalty Decision disallows the Utility from recovering $850 million of costs associated with future pipeline safety-related projects and programs to be designated by the CPUC, with a minimum of $689 million of the costs to be capital related.)

The following table shows the revenue requirement amounts requested by the Utility in the 2015 GT&S rate case and the revenue requirement amounts adopted in the CPUC decision, subject to future adjustments for the $850 million San Bruno penalty:

*(in millions)*

|  | 2015 | 2016 | 2017 | 2018 (2) |
| --- | ---: | ---: | ---: | ---: |
| Utility Requested Revenue Requirement | $1,263 | $1,346 | $1,488 | $N/A |
| "Interim" Revenue Requirement | 1,046 | 1,110 | 1,220 | 1,324 |
| "Placeholder" Ex Parte Penalty (1) | (138) |  |  |  |
| Revenue Requirement Before Penalty Decision Disallowance | 908 | 1,110 | 1,220 | 1,324 |

(1) The revenue requirement is reduced by $138 million in 2015 for the disallowance associated with the 5-month delay caused by the Utility’s violation of the CPUC ex parte communication rules in this proceeding, subject to modification after the revenue requirement is adjusted for the $850 million San Bruno penalty.

(2) Due to the delay in issuing this Decision, the CPUC adopted a third year of attrition revenues for 2018.

In 2015, the Utility’s GT&S revenues were approximately $550 million. The decision authorizes the Utility to collect, over a 36-month period, the difference between adopted revenue requirements and amounts previously collected in rates, retroactive to January 1, 2015. Due to the uncertainty regarding the revenue requirement the CPUC will ultimately adopt in its phase two decision, after allocation of the $850 million Penalty Decision disallowance (and the resulting adjustment of the ex parte disallowance), the Utility will not be able to record the revenue requirement increase since January 1, 2015 until after the phase two decision is issued. In addition, accounting rules allow the Utility to recognize revenues in a given year only if they will be collected from customers within 24 months of the end of that year. As a result, the Utility will not be able to complete recording the full retroactive revenue requirement increase until 2017.

The decision adopts capital expenditures of roughly $700 million to $800 million per year through 2018 and authorizes weighted average rate base of $2.9 billion in 2015, $3.3 billion in 2016, $3.6 billion in 2017, and $4.2 billion in 2018. The authorized weighted average rate base excludes $696 million of capital spending in 2011 through 2014 in excess of the amount adopted. The decision permanently disallows $120 million of that amount and orders that the remaining $576 million be subject to a third party audit overseen by the CPUC staff, with the possibility that the Utility may seek recovery in a future proceeding. The decision also establishes various cost caps that will increase the risk of overspend over the current rate case cycle including new one-way capital balancing accounts. As a result, during the three and six months ended June 30, 2016 the Utility incurred charges of $190 million for capital expenditures that the Utility believes are probable of disallowance based on the decision. This includes $134 million to the net plant balance for 2011 through 2014 capital expenditures in excess of adopted amounts and $56 million for the Utility’s estimate of 2015 through 2018 capital expenditures that are probable of exceeding authorized amounts. Additional charges may be required in the future based on the Utility’s ability to manage its capital spending and on the outcome of the third party audit of 2011through 2014 capital spending.

The decision denies the Utility’s request for full balancing account treatment for recovery of authorized transportation and storage revenue requirements, and instead continues the revenue sharing mechanism authorized in the 2011 GT&S rate case that subjects a portion of the Utility’s transportation and storage revenue requirement to market risk.

The decision also authorizes the Utility’s request for cost recovery of up to $157 million for the construction of Line 407, a 25.5 mile, 30-inch pipeline in the Sacramento Valley expected to be built during this rate case period. The authorized revenue requirements will begin when Line 407 becomes operational, subject to refund upon a reasonableness review in the Utility’s next GT&S rate case. The decision authorizes the Utility to track costs exceeding $157 million and seek recovery in the next GT&S rate case, subject to a reasonableness review.

With the addition of a third attrition year, the Utility’s next GT&S cycle will begin in 2019. The decision requires the Utility to file its next GT&S application in 2017.

On July 6, 2016, Indicated Shippers filed a motion to compel with the CPUC, requesting that the Utility submits information regarding rate impacts of various scenarios of the penalty implementation. In addition, on July 7, 2016, several parties filed opening briefs on the allocation of the $850 million Penalty Decision disallowance. In their briefs, some parties recommended that the $850 million be allocated to 100 percent expense to mitigate rate impacts. On July 8, 2016, the ALJ issued a ruling granting in part the motion to compel filed by the Indicated Shippers and, as a result, modified the briefing schedule. Supplemental opening briefs were submitted on July 26 and reply briefs are due on August 2, 2016. The Utility expects that the CPUC will issue a phase two decision within 90 days of the reply briefs.

For more information, see Item 4 of the 2015 Form 10-K and Item 2 of the 2016 Q1 Form 10-Q.

### FERC Transmission Owner Rate Cases

On July 29, 2015, the Utility requested 2016 retail electric transmission revenue requirement of $1.515 billion, a $314 million increase over the currently authorized revenue requirement of $1.201 billion. The Utility’s proposed rates went into effect on March 1, 2016, subject to refund, and pending a final decision by the FERC. The parties to this proceeding are in settlement discussions. If a settlement is reached by the parties, it will be subject to the FERC’s approval. If settlement is not reached, the proceeding will be set for hearing and depending on the timing of such a hearing, the Utility expects that the FERC will issue a decision in mid to late 2017.

The Utility expects to file a rate case at FERC to request a 2017 retail electric transmission revenue requirement on July 29, 2016. The Utility expects to indicate that it will make investments of $1.296 billion in 2017 in various capital projects. The Utility also expects to indicate that its forecasted rate base for 2017 is $6.713 billion, compared to forecasted rate base of $5.85 billion in 2016. A FERC order accepting the Utility’s filing, setting an effective date for rates, subject to hearing and refund, is expected by September 30, 2016. While the Utility will request that the new rates be effective on October 1, 2016, subject to refund, pending a final decision by the FERC, the Utility anticipates that the rates will be suspended for five months and made effective on March 1, 2017, subject to refund.

### CPUC Cost of Capital Decision

On February 25, 2016, the CPUC issued a decision granting a petition for modification filed by the Utility and the other two California investor-owned electric utilities to clarify that the CPUC’s previously adopted cost of capital adjustment mechanism would not be triggered before their 2018 cost of capital applications are due on April 20, 2017. As a result, the Utility’s currently authorized return on equity of 10.40% and capital structure, consisting of 52% common equity, 47% long-term debt, and 1% preferred stock, will remain the same for 2017.

### Diablo Canyon Nuclear Power Plant

#### Joint Proposal for Plant Retirement

On June 20, 2016, the Utility entered into a joint proposal with Friends of the Earth, Natural Resources Defense Council, Environment California, International Brotherhood of Electrical Workers Local 1245, Coalition of California Utility Employees, and Alliance for Nuclear Responsibility to retire Diablo Canyon at the expiration of its current operating licenses in 2024 and 2025 and replace it with a GHG-free portfolio of energy efficiency, renewables, and energy storage.

The joint proposal also includes a voluntary increase in the Utility’s target for RPS-eligible resources to 55 percent, effective in 2031 through 2045, as compared to the state’s goal of 50 percent renewables. The parties to the joint agreement proposed that the Utility be authorized to procure GHG-free replacement resources in three competitive procurement tranches: in Tranche 1, the Utility would be authorized to obtain 2,000 gross GWH of energy efficiency savings to be implemented over the 2018 to 2024 time period; in Tranche 2, the Utility would be authorized to procure 2,000 GWH of GHG-free energy resources through an all-source solicitation that will commence energy deliveries or add energy efficiency programs or projects to the system in the 2025 to 2030 time period, and; in Tranche 3, the Utility commits to a voluntary 55 percent RPS, and will maintain this voluntary commitment through 2045 or until superseded by action of the state legislature or the CPUC. The three tranches of resource procurement proposed in the joint proposal are not intended to specify all energy resources that will be needed to ensure the orderly replacement of Diablo Canyon. Instead, the Utility expects that the full solution will emerge over the 2024-2045 period.

Costs associated with energy efficiency programs in Tranche 1 and Tranche 2 would be recovered through the Utility’s electric public purpose program rates as non-bypassable charges, consistent with the existing recovery mechanisms for energy efficiency program costs. GHG-free energy resources costs from Tranche 2 would be subject to a non-bypassable cost allocation mechanism called the Clean California Charge that (1) equitably allocates costs and benefits, such as RPS or Resource Adequacy credits, associated with the procurement among responsible load-serving entities, and (2) determines the net capacity costs of such procurement consistent with the methodology for the allocation of net capacity costs laid out by the CPUC. Costs associated with procurement for Tranche 3 would be recovered through a separate renewable non-bypassable charge.

The joint proposal seeks confirmation from the CPUC that the Utility’s full investment in Diablo Canyon and authorized rate of return will be recovered in rates by the time the facility ceases operations. Additionally, the Utility requests that the CPUC pre-approve the recovery of certain costs related to the closure of the Diablo Canyon. These include the non-bypassable cost allocation mechanism for procurement of GHG-free energy and the recovery of $1.3 billion for administration and acquisition of the new Tranche 1 energy efficiency procurement as authorized energy efficiency funding, subject to return of all unspent funds; the recovery of employee retention and retraining and development programs to continue safe and efficient operation of Diablo Canyon through the end of its license periods, estimated at approximately $350 million; and a community mitigation program to compensate San Luis Obispo County for the decline in local economic stimulus provided by Diablo Canyon through a transition period ending in 2025, estimated at approximately $50 million. The Utility also seeks cost recovery of approximately $50 million in costs related to the federal and state Diablo Canyon license renewal process.

The Utility expects to submit its application to the CPUC to approve the joint proposal and cost recovery requests included therein, as well as the resulting revenue requirements in August 2016. Upon CPUC approval of the application, the Utility will withdraw its license renewal application currently pending before the NRC when such approval has become final and non-appealable. PG&E Corporation and the Utility are unable to predict whether the CPUC will approve the joint proposal application.

#### California State Lands Commission Lands Lease

On June 28, 2016, California State Lands Commission approved a new lands lease for the intake and discharge structures at Diablo Canyon to run concurrently with Diablo Canyon’s current operating licenses, until Diablo Canyon Unit 2 ceases operations in August 2025. The Utility believes that the approval of the New Lease will ensure sufficient time for the Utility to identify and bring online a portfolio of GHG-free replacement resources. The Utility will submit a future lease extension request to address the period of time required for plant decommissioning, which under NRC regulations can take as long as 20 years.

#### Asset Retirement Obligations

The Utility expects that the decommissioning of Diablo Canyon will take many years after the expiration of its current operating licenses. Detailed studies of the cost to decommission the Utility’s nuclear generation facilities are conducted every three years in conjunction with the NDCTP. Actual decommissioning costs may vary from these estimates as a result of changes in assumptions such as decommissioning dates; regulatory requirements; technology; and costs of labor, materials, and equipment. The Utility recovers its revenue requirements for decommissioning costs from customers through a non-bypassable charge that the Utility expects will continue until those costs are fully recovered.

On March 1, 2016, the Utility submitted its updated decommissioning cost estimate with the CPUC. The estimated undiscounted cost to decommission the Utility’s nuclear power plants increased by approximately $1.4 billion, for a total estimated cost of $4.8 billion, due to increased estimated costs related to spent fuel storage, staffing, and out-of-state waste disposal. The Utility requested that the CPUC authorize the collection of increased annual revenue requirements beginning on January 1, 2017 based on these updated cost estimates. Additionally, as a result of the joint proposal discussed above, an increase of $115 million to the ARO was recognized on the Condensed Consolidated Balance Sheets at June 30, 2016.

While the NDCTP forecast includes employee severance program estimates, it does not include estimated costs related to the joint proposal’s employee retention and retraining and development programs, and the San Luis Obispo County community mitigation program described above. The Utility intends to conduct a site-specific decommissioning study to update the 2015 NDCTP forecast and to submit the study to the CPUC by mid-2019.

On July 15, 2016, the assigned CPUC Commissioner and ALJ issued a scoping memo for the Utility’s 2015 NDCTP and excluded from the scope of the proceeding the issue on whether the Utility should be required to present additional analysis for a license extension scenario for Diablo Canyon, as a result of the Utility’s announcement of its plan to not seek relicensing of Diablo Canyon beyond its current operating authority. The scoping memo also adopts within the scope of the proceeding a reasonableness review of the Utility’s estimated updated cost to decommission the Utility’s nuclear power plants and of the forecasts of certain expenses and the decommissioning trust funds’ rates of return. According to the scoping memo, intervenor testimony is due in August 2016, rebuttal testimony and evidentiary hearings will take place in September 2016, and opening and reply briefs will be submitted in October 2016.

The estimated nuclear decommissioning cost is discounted for GAAP purposes and recognized as an ARO on the Condensed Consolidated Balance Sheets. The total nuclear decommissioning obligation accrued in accordance with GAAP was $3.4 billion at June 30, 2016, which includes an $818 million adjustment to reflect the increased cost estimates and the $115 million increase resulting from the joint proposal described above, and $2.5 billion at December 31, 2015. These estimates are based on decommissioning cost studies, prepared in accordance with the CPUC requirements. Changes in these estimates could materially affect the amount of the recorded ARO for these assets.

As of June 30, 2016, the nuclear decommissioning trust accounts’ total fair value was $2.9 billion. Changes in the estimated costs, the timing of decommissioning or the assumptions underlying these estimates could cause material revisions to the estimated total cost to decommission.

For additional information, see the 2015 Form 10-K and the 2016 Q1 Form 10-Q.

### CPUC Investigation of the Utility’s Safety Culture

On August 27, 2015, the CPUC began a formal investigation into whether the organizational culture and governance of PG&E Corporation and the Utility prioritize safety and adequately direct resources to promote accountability and achieve safety goals and standards. The CPUC directed the SED to evaluate the Utility’s and PG&E Corporation’s organizational culture, governance, policies, practices, and accountability metrics in relation to the Utility’s record of operations, including its record of safety incidents. The CPUC authorized the SED to engage a consultant to assist in the SED’s investigation and the preparation of a report containing the SED’s assessment. The consultant’s work began in the second quarter of 2016.

The CPUC stated that the initial phase of the proceeding was categorized as rate setting because it will consider issues both of fact and policy and because the Utility and PG&E Corporation do not face the prospect of fines, penalties, or remedies in this phase. Upon completion of the consultant’s report, the assigned Commissioner will determine the scope of and next actions in the proceeding. The timing scope and potential outcome of the investigation are uncertain.

### Rehearing of CPUC Decisions Approving 2006 – 2008 Energy Efficiency Incentive Awards

On September 17, 2015, the CPUC granted TURN’s and ORA’s long-standing applications for rehearing of the CPUC decisions that awarded energy efficiency incentive payments to the California IOUs for the 2006-2008 energy efficiency program cycle. Under the incentive ratemaking mechanism applicable to the 2006-2008 program cycle, the Utility could have earned incentive revenues up to a maximum of $180 million, depending on the extent to which the Utility achieved the energy savings targets. Conversely, to the extent the Utility failed to achieve the targets, the Utility could have been required to offset future incentive earnings claims by amounts previously awarded, and, in addition, could have incurred penalties of up to $180 million. The Utility was awarded a total of $104 million for the 2006-2008 program cycle.

On June 24, 2016, the Utility, ORA, and TURN jointly filed a motion with the CPUC seeking approval of a settlement agreement to resolve all issues related to the 2006-2008 customer energy efficiency shareholder incentives. The settlement agreement requires the Utility to reduce certain future energy efficiency shareholder incentives by $29.1 million. The reduction of the shareholder incentive award will be applied in installments of $5.8 million per year for five years, provided that the Utility has sufficient energy efficiency incentive awards to offset that amount. If shareholder incentives are insufficient to offset this amount, the offset in the following year will be increased by the shortfall. At its discretion, the Utility may increase the amount of the offset to reduce the $29.1 million more quickly. If the amount has not been fully offset at the end of five years, the balance will be credited towards electric and gas rates. The first offset will be requested by the Utility in the September 1, 2016 shareholder incentive advice letter. The requested offset will be conditioned on final CPUC approval of the settlement agreement without modifications. It is uncertain whether the CPUC will approve the settlement agreement and when the CPUC will issue a decision.

### Residential Rate Reform Rate Change

On February 17, 2016, the Utility filed a proposed rate change for rates to be billed to customers effective March 1, 2016. On February 29, 2016, the CPUC rejected the Utility’s proposed rate change, stating that the rate design failed to comply with the requirements adopted in the Decision on Residential Rate Reform issued on July 3, 2015, that set a specific rate change “glidepath” for the Utility. The Utility began billing customers based on its proposed rates on March 1, 2016. On March 9, 2016, the assigned ALJ issued a ruling directing the Utility to show cause why the CPUC should not order sanctions and other remedies in response to the alleged non-compliance. On March 11, 2016, the Utility submitted its response in which it stated that its rates were in compliance with the CPUC’s July 2015 decision and addressed the circumstances that make it impossible for the Utility to follow the “glidepath.” On March 24, 2016, the Utility filed an additional advice letter proposing a new, three-tiered rate structure. On May 26, 2016, the CPUC approved the Utility’s three-tiered rate structure and advice letter. The CPUC’s approval recognized that the Utility’s rates fulfill the requirements of the July 2015 decision as applied to the Utility’s particular circumstances. As of the date of this report, the CPUC has not directly terminated its ruling to show cause or ordered sanctions or other remedies. The Utility is uncertain if the CPUC will impose any sanctions or other remedies, and if it does so, their amounts. The CPUC is not required to take any further action on its ruling to show cause.

For more information, see Item 2 of the 2016 Q1 Form 10-Q.

### Utility-Owned PV Generation Cost Savings Incentive Award

In April 2010, the CPUC authorized the Utility to develop, own, and operate PV facilities and established a cost savings incentive mechanism which states that shareholders are eligible to retain ten percent of the difference between the actual average cost per unit and the threshold set by the CPUC. From 2011 – 2013, the Utility constructed nine PV projects with a total capacity of 150 MW and the weighted average unit capital cost came in below the CPUC specified threshold. In July 2016, the CPUC approved the recovery of $16 million in shareholder incentives related to these projects under the PV capital cost savings incentive mechanism.

### LEGISLATIVE AND REGULATORY INITIATIVES

The California Legislature and the CPUC have adopted requirements and policies to accommodate the growth in distributed electric generation resources (including solar installations), increase the amount of renewable energy delivered to customers, foster the development of a state-wide electric vehicle charging infrastructure to encourage the use of electric vehicles, promote customer energy efficiency and demand response programs, and implement new state law requirements applicable to natural gas storage facilities. In addition, the CPUC continues to implement state law requirements to reform electric rates to more closely reflect the utilities’ actual costs of service, reduce cross-subsidization among customer rate classes, implement new rules and rates for net energy metering (which currently allow certain self-generating customers to receive bill credits for surplus power at the full retail rate), and allow customers to have greater control over their energy use. Significant developments that have occurred since the 2015 Form 10-K was filed with the SEC are discussed below.

The Utility’s ability to recover its costs, including investments associated with legislative and regulatory initiatives, as well as its electricity procurement and other operating costs, will, in large part, depend on the final form of legislative or regulatory requirements, and whether the associated ratemaking mechanisms can be timely adjusted to reflect changes in customer demand for the Utility’s electricity and natural gas service.

#### Electric Distribution Resources Plan

As required by California law, on July 1, 2015, the Utility filed its proposed electric distribution resources plan for approval by the CPUC. The Utility’s plan identifies optimal locations on its electric distribution system for deployment of distributed energy resources. The Utility’s proposal is designed to allow energy technologies to be interconnected with each other and integrated into the larger grid while continuing to provide customers with safe, reliable and affordable electric service. The Utility envisions a future electric grid, titled the Grid of Things™, that would allow customers to choose new advanced energy supply technologies and services to meet their needs consistent with safe, reliable and affordable electric service. The Utility’s 2017 GRC includes a request to recover some of the investment costs that it forecasts it will incur under its proposed electric distribution resources plan.

#### Integrated Distributed Energy Resources – Regulatory Incentives Pilot Program

On April 4, 2016, the assigned CPUC Commissioner and ALJ issued a ruling proposing to establish, on a pilot basis, an interim program offering regulatory incentives to the Utility and the other two large California IOUs for the deployment of cost-effective DERs. The ruling assumes that the incentive would take the form of an additional payment to the utility of 3.5% (grossed up for taxes) of the payments made to the DER provider(s). The exact figure would be determined later if the proposal or a similar alternative is adopted by the CPUC. The ruling also states that it does not intend for this phase to adopt a new regulatory framework or business model for the California electric utilities.

On May 9 and May 23, 2016, the Utility, two other California utilities (the “Joint Utilities”) and other parties filed their comments. The Joint Utilities indicate that providing a regulatory incentive to utilities to deploy DERs in place of distribution investment is premature until the operating and performance characteristics of DERs are better understood and evaluated as part of pilot projects. The Joint Utilities instead propose initiating DER pilots that would advance understanding of distribution deferral and DER procurement processes.

On June 17, 2016, the Utility filed revised proposals to conduct demonstration projects under its Distribution Resources Plan to test and demonstrate the operating and performance characteristics of DERs that could defer utility distribution capacity investments. The timing and schedule for CPUC review and approval of the demonstration projects and any regulatory incentive proposal is uncertain.

#### Electric Rate Reform and Net Energy Metering

On July 3, 2015, the CPUC approved a final decision to authorize the California IOUs to gradually flatten their tiered residential electric rate structures from four tiers to two tiers by January 1, 2019. The decision approved higher minimum bill charges for residential customers and also allows the imposition of a surcharge on customers with extremely high electricity use beginning in 2017. The decision requires the Utility to file a proposal by January 1, 2018, to charge residential electric customers based on time-of-use rates (known as “default time-of-use rates”) unless customers elect otherwise. The Utility also may propose to impose a fixed charge on residential electric customers. Under the CPUC’s decision, default time-of-use rates must be implemented before the CPUC will permit the imposition of a fixed charge in electric rates.

In January 2016, the CPUC adopted new NEM rules and rates. The new rules and rates are expected to become effective for new NEM customers later in 2016, when the Utility is expected to reach its current NEM cap. The CPUC indicated that it will revisit the NEM successor tariff in 2019. New NEM customers will be required to pay an interconnection fee, will be charged on time-of-use rates, and will be required to pay non-bypassable charges to help fund some of the costs of low-income, energy efficiency, and other programs that other customers pay. On March 7, 2016, the Utility and certain other parties, including TURN and CUE, filed applications for rehearing. The Utility requested that the CPUC vacate its January 2016 decision that the Utility asserts contains legal and factual errors. Many parties argued that the CPUC failed to complete its duties under AB 327, which required the CPUC to evaluate the costs and benefits of NEM. On July 14, 2016, the CPUC held a closed session discussion on the parties’ applications for rehearing (previously filed on March 7, 2016). The Utility is uncertain when the CPUC will issue a decision.

#### Electric Vehicle (EV) Infrastructure Development

In December 2014, the CPUC issued a decision adopting a policy to expand the California utilities’ role in developing EV charging infrastructure to support California’s climate goals. On February 9, 2015, the Utility filed an application requesting that the CPUC approve the Utility’s proposal to deploy, own, and maintain more than 25,000 EV charging stations and the associated infrastructure. The Utility proposed to engage with third-party EV service providers to operate and maintain the charging stations. The Utility requested that the CPUC approve forecasted capital expenditures of $551 million over the 5-year deployment period.

On September 4, 2015, the assigned CPUC Commissioner and the ALJ issued a scoping memo and procedural schedule that required the Utility to supplement its application by submitting a more phased deployment approach that will be considered in a first phase of the proceeding. On October 12, 2015, the Utility submitted supplemental testimony presenting two separate proposals. In its first proposal, the Utility has requested that the CPUC approve approximately $70 million in capital expenditures to deploy and own 2,510 EV charging stations over approximately 2 years. In its second proposal, the Utility has requested that the CPUC approve approximately $187 million in capital expenditures to deploy and own 7,530 EV charging stations over approximately 3 years.

On March 21, 2016, the Utility filed with the CPUC a settlement agreement that it entered into with certain parties, including environmental advocates, automakers, electric vehicle drivers, labor, and environmental justice advocates, that makes adjustments to the Utility’s second proposal, including a reduction to requested capital expenditures to approximately $132 million. (TURN, ORA, and certain equipment suppliers are not parties to the agreementand filed responses on April 12, 2016, generally opposing the settlement.) The settlement agreement is subject to approval by the CPUC. Hearings were held in April 2016 and a proposed decision for the first phase of the proceeding is expected to be issued in the third quarter of 2016. Further deployment of EV charging stations would be considered in a second phase of the proceeding depending on the outcome of the first phase.

### ENVIRONMENTAL MATTERS

The Utility’s operations are subject to extensive federal, state, and local laws and permits relating to the protection of the environment and the safety and health of the Utility’s personnel and the public. These laws and requirements relate to a broad range of the Utility’s activities, including the remediation of hazardous wastes, such as groundwater contamination caused by hexavalent chromium used in the past at the Utility’s natural gas compressor stations; the reporting and reduction of carbon dioxide and other greenhouse gas emissions; the discharge of pollutants into the air, water, and soil; and the transportation, handling, storage, and disposal of spent nuclear fuel. (See Note 9 of the Notes to the Condensed Consolidated Financial Statements, as well as “Item 1A. Risk Factors” and Note 13 in the 2015 Form 10-K.)

### CONTRACTUAL COMMITMENTS

PG&E Corporation and the Utility enter into contractual commitments in connection with future obligations that relate to purchases of electricity and natural gas for customers, purchases of transportation capacity, purchases of renewable energy, and purchases of fuel and transportation to support the Utility’s generation activities. (See “Purchase Commitments” in Note 9 of the Notes to the Condensed Consolidated Financial Statements). Contractual commitments that relate to financing arrangements include long-term debt, preferred stock, and certain forms of regulatory financing. For more in-depth discussion about PG&E Corporation’s and the Utility’s contractual commitments, see “Liquidity and Financial Resources” above and Management’s Discussion and Analysis of Financial Condition and Results of Operations – Contractual Commitments in the 2015 Form 10-K.

### Off-Balance Sheet Arrangements

PG&E Corporation and the Utility do not have anyoff-balance sheet arrangements that have had, or are reasonably likely to have, a current or future material effect on their financial condition, changes in financial condition, revenues or expenses, results of operations, liquidity, capital expenditures, or capital resources, other than those discussed in Note 13 of the Notes to the Consolidated Financial Statements in the 2015 Form 10-K (the Utility’s commodity purchase agreements).

### RISK MANAGEMENT ACTIVITIES

PG&E Corporation, mainly through its ownership of the Utility, and the Utility are exposed to market risk, which is the risk that changes in market conditions will adversely affect net income or cash flows. PG&E Corporation and the Utility face market risk associated with their operations; their financing arrangements; the marketplace for electricity, natural gas, electric transmission, natural gas transportation, and storage; emissions allowances and offset credits, other goods and services; and other aspects of their businesses. PG&E Corporation and the Utility categorize market risks as “price risk” and “interest rate risk.” The Utility is also exposed to “credit risk,” the risk that counterparties fail to perform their contractual obligations.

The Utility actively manages market risk through risk management programs designed to support business objectives, discourage unauthorized risk-taking, reduce commodity cost volatility, and manage cash flows. The Utility uses derivative instruments only for non-trading purposes (i.e., risk mitigation) and not for speculative purposes. The Utility’s risk management activities include the use of physical and financial instruments such as forward contracts, futures, swaps, options, and other instruments and agreements, most of which are accounted for as derivative instruments. Some contracts are accounted for as leases. The Utility manages credit risk associated with its counterparties by assigning credit limits based on evaluations of their financial conditions, net worth, credit ratings, and other credit criteria as deemed appropriate. Credit limits and credit quality are monitored periodically. These activities arediscussed in detail in the 2015 Form 10-K. There were no significant developments to the Utility and PG&E Corporation’s risk management activities during the six months ended June 30, 2016.

### CRITICAL ACCOUNTING POLICIES

The preparation of the Condensed Consolidated Financial Statements in accordance with GAAP involves the use of estimates and assumptions that affect the recorded amounts of assets and liabilities as of the date of the Condensed Consolidated Financial Statements and the reported amounts of revenues and expenses during the reporting period. PG&E Corporation and the Utility consider their accounting policies for regulatory assets and liabilities, loss contingencies associated with environmental remediation liabilities and legal and regulatory matters, asset retirement obligations, and pension and other postretirement benefits plans to be critical accounting policies. These policies are considered critical accounting policies due, in part, to their complexity and because their application is relevant and material to the financial position and results of operations of PG&E Corporation and the Utility, and because these policies require the use of material judgments and estimates. Actual results may differ materially from these estimates. These accounting policies and their key characteristics are discussed in detail in the 2015Form 10-K.

### ACCOUNTING STANDARDS ISSUED BUT NOT YET ADOPTED

See the discussion above in Note 2 of the Notes to the Condensed Consolidated Financial Statements.

### FORWARD-LOOKING STATEMENTS

This report contains forward-looking statements that are necessarily subject to various risks and uncertainties. These statements reflect management’s judgment and opinions which are based on current estimates, expectations, and projections about future events and assumptions regarding these events and management's knowledge of facts as of the date of this report. These forward-looking statements relate to, among other matters, estimated losses, including penalties and fines, associated with various investigations and proceedings; forecasts of pipeline-related expenses that the Utility will not recover through rates; forecasts of capital expenditures; estimates and assumptions used in critical accounting policies, including those relating to regulatory assets and liabilities, environmental remediation, litigation, third-party claims, and other liabilities; and the level of future equity or debt issuances. These statements are also identified by words such as “assume,” “expect,” “intend,” “forecast,” “plan,” “project,” “believe,” “estimate,” “predict,” “anticipate,” “may,” “should,” “would,” “could,” “potential” and similar expressions. PG&E Corporation and the Utility are not able to predict all the factors that may affect future results. Some of the factors that could cause future results to differ materially from those expressed or implied by the forward-looking statements, or from historical results, include, but are not limited to:

- the timing and outcomes of the final phase two CPUC decision in the 2015 GT&S rate case, the 2017 GRC, the TO rate cases, and other ratemaking and regulatory proceedings;
- the timing and outcomes of the federal criminal prosecution of the Utility, the CPUC decision in the Utility’s natural gas distribution record-keeping practices investigation, the SED’s unresolved enforcement matters relating to the Utility’s compliance with natural gas-related laws and regulations, and the other investigations that have been or may be commenced relating to the Utility’s compliance with natural gas-related laws and regulations, and the ultimate amount of fines, penalties, and remedial costs that the Utility may incur in connection with the outcomes;
- the timing and outcomes of the CPUC’s investigation of communications between the Utility and the CPUC that may have violated the CPUC’s rules regarding ex parte communications or are otherwise alleged to be improper, and of the U.S. Attorney’s Office in San Francisco and the California Attorney General’s office investigations in connection with communications between the Utility’s personnel and CPUC officials, whether additional criminal or regulatory investigations or enforcement actions are commenced with respect to allegedly improper communications, and the extent to which such matters negatively affect the final decisions to be issued in the Utility’s ratemaking proceedings;
- the outcome of the Butte fire litigation, and whether the Utility’s insurance is sufficient to cover the Utility’s liability resulting therefrom or if insurance is otherwise available; and whether additional investigations and proceedings will be opened;
- whether PG&E Corporation and the Utility are able to repair the harm to their reputations caused by the criminal prosecution of the Utility, the state and federal investigations of natural gas incidents, matters relating to the indicted case, improper communications between the CPUC and the Utility; and the Utility’s ongoing work to remove encroachments from transmission pipeline rights-of-way;
- whether the Utility can control its costs within the authorized levels of spending, the extent to which the Utility incurs unrecoverable costs that are higher than the forecasts of such costs, and changes in cost forecasts or the scope and timing of planned work resulting from changes in customer demand for electricity and natural gas or other reasons;
- the amount and timing of additional common stock and debt issuances by PG&E Corporation, including the dilutive impact of common stock issuances to fund PG&E Corporation’s equity contributions to the Utility as the Utility incurs charges and costs, including fines, that it cannot recover through rates;
- the outcome of the CPUC’s investigation into the Utility’s safety culture, and future legislative or regulatory actions that may be taken to require the Utility to separate its electric and natural gas businesses, restructure into separate entities, undertake some other corporate restructuring, or implement corporate governance changes;
- the outcomes of future investigations or other enforcement proceedings that may be commenced relating to the Utility’s compliance with laws, rules, regulations, or orders applicable to its operations, including the construction, expansion or replacement of its electric and gas facilities; inspection and maintenance practices, customer billing and privacy, and physical and cyber security;

62

|  |  |
| --- | --- |
|  | the impact of environmental remediation laws, regulations, and orders; the ultimate amount of costs incurred to discharge the Utility’s known and unknown remediation obligations; and the extent to which the Utility is able to recover environmental costs in rates or from other sources; |
| • | the ultimate amount of unrecoverable environmental costs the Utility incurs associated with the Utility’s natural gas compressor station site located near Hinkley, California; |
| • | the impact of new legislation or NRC regulations, recommendations, policies, decisions, or orders relating to the nuclear industry, including operations, seismic design, security, safety, relicensing, the storage of spent nuclear fuel, decommissioning, cooling water intake, or other issues; the impact of actions taken by state agencies, that may affect the Utility’s ability to continue operating Diablo Canyon; whether the CPUC approves the joint proposal that will phase out the Utility’s Diablo Canyon nuclear units at the expiration of their licenses in 2024 and 2025; whether the Utility obtains the approvals required to withdraw its NRC application to renew the two Diablo Canyon operating licenses; and whether the Utility will be able to successfully implement its retention and retraining and development programs for Diablo Canyon employees, and whether these programs will be recovered in rates; |
| • | whether the Utility’s information technology, operating systems and networks, including the advanced metering system infrastructure, customer billing, financial, records management, and other systems, can continue to function accurately while meeting regulatory requirements; whether the Utility and its third party vendors and contractors (who host, maintain, modify and update some of the Utility’s systems) are able to protect the Utility’s operating systems and networks from damage, disruption, or failure caused by cyber-attacks, computer viruses, or other hazards; whether the Utility’s security measures are sufficient to protect against unauthorized or inadvertent disclosure of information contained in such systems and networks, including confidential proprietary information and the personal information of customers; and whether the Utility can continue to rely on third-party vendors and contractors that maintain and support some of the Utility’s information technology and operating systems; |
| • | the impact of droughts or other weather-related conditions or events, wildfires (such as the Butte fire), climate change, natural disasters, acts of terrorism, war, or vandalism (including cyber-attacks), and other events, that can cause unplanned outages, reduce generating output, disrupt the Utility’s service to customers, or damage or disrupt the facilities, operations, or information technology and systems owned by the Utility, its customers, or third parties on which the Utility relies; whether the Utility incurs liability to third parties for property damage or personal injury caused by such events; and whether the Utility is subject to civil, criminal, or regulatory penalties in connection with such events; and whether the Utility’s insurance coverage is available for these types of claims and whether the amount of insurance is sufficient to cover the Utility’s liability; |
| • | how the CPUC and the CARB implement state environmental laws relating to GHG, renewable energy targets, energy efficiency standards, distributed energy resources, electric vehicles, and similar matters, including whether the Utility is able to continue recovering associated compliance costs, such as the cost of emission allowances and offsets under cap-and-trade regulations, and whether the Utility is able to timely recover its associated investment costs; |
| • | whether the Utility’s climate change adaptation strategies are successful; |
| • | the impact that reductions in customer demand for electricity and natural gas have on the Utility’s ability to make and recover its investments through rates and earn its authorized return on equity, and whether the Utility is successful in addressing the impact of growing distributed and renewable generation resources and changing customer demand for natural gas and electric services; |
| • | the supply and price of electricity, natural gas, and nuclear fuel; the extent to which the Utility can manage and respond to the volatility of energy commodity prices; the ability of the Utility and its counterparties to post or return collateral in connection with price risk management activities; and whether the Utility is able to recover timely its electric generation and energy commodity costs through rates, including its renewable energy procurement costs; |
| • | the amount and timing of charges reflecting probable liabilities for third-party claims; the extent to which costs incurred in connection with third-party claims or litigation can be recovered through insurance, rates, or from other third parties; and whether the Utility can continue to obtain adequate insurance coverage for future losses or claims, especially following a major event that causes widespread third-party losses; |
| • | the ability of PG&E Corporation and the Utility to access capital markets and other sources of debt and equity financing in a timely manner on acceptable terms; |

63

- changes in credit ratings which could result in increased borrowing costs especially if PG&E Corporation or the Utility were to lose its investment grade credit ratings;
- the impact of federal or state laws or regulations, or their interpretation, on energy policy and the regulation of utilities and their holding companies, including how the CPUC interprets and enforces the financial and other conditions imposed on PG&E Corporation when it became the Utility’s holding company, and whether the ultimate outcomes of the CPUC’s pending investigations, the criminal prosecution, and other enforcement matters affect the Utility’s ability to make distributions to PG&E Corporation, and, in turn, PG&E Corporation’s ability to pay dividends;
- the outcome of federal or state tax audits and the impact of any changes in federal or state tax laws, policies, regulations, or their interpretation; and
- the impact of changes in GAAP, standards, rules, or policies, including those related to regulatory accounting, and the impact of changes in their interpretation or application.

For more information about the significant risks that could affect the outcome of these forward-looking statements and PG&E Corporation’s and the Utility’s future financial condition, results of operations, and cash flows, see “Risk Factors” in the 2015 Form 10-K and in Part II, Item. 1A. Risk Factors below. PG&E Corporation and the Utility do not undertake any obligation to update forward-looking statements, whether in response to new information, future events, or otherwise.

## Market risk

As filed, 606 characters.

PG&E Corporation’s and the Utility’s primary market risk results from changes in energy commodity prices. PG&E Corporation and the Utility engage in price risk management activities for non-trading purposes only. Both PG&E Corporation and the Utility may engage in these price risk management activities using forward contracts, futures, options, and swaps to hedge the impact of market fluctuations on energy commodity prices and interest rates. (See the section above entitled “Risk Management Activities” in Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations.)

## Controls and procedures

As filed, 1,562 characters.

Based on an evaluation of PG&E Corporation’s and the Utility’s disclosure controls and procedures as of June 30, 2016, PG&E Corporation’s and the Utility’s respective principal executive officers and principal financial officers have concluded that such controls and procedures were effective to ensure that information required to be disclosed by PG&E Corporation and the Utility in reports that the companies file or submit under the Securities Exchange Act of 1934 is recorded, processed, summarized, and reported within the time periods specified in the SEC rules and forms. In addition, PG&E Corporation’s and the Utility’s respective principal executive officers and principal financial officers have concluded that such controls and procedures were effective in ensuring that information required to be disclosed by PG&E Corporation and the Utility in the reports that PG&E Corporation and the Utility file or submit under the Securities Exchange Act of 1934 is accumulated and communicated to PG&E Corporation’s and the Utility’s management, including PG&E Corporation’s and the Utility’s respective principal executive officers and principal financial officers, or persons performing similar functions, as appropriate to allow timely decisions regarding required disclosure.

There were no changes in internal control over financial reporting that occurred during the quarter ended June 30, 2016, that have materially affected, or are reasonably likely to materially affect, PG&E Corporation’s or the Utility’s internal control over financial reporting.

## Risk factors

As filed, 15,138 characters.

For information about the significant risks that could affect PG&E Corporation’s and the Utility’s future financial condition, results of operations, and cash flows, see the section of the 2015 Form 10-K entitled “Risk Factors,” as supplemented below, and the section of this quarterly report entitled “Forward-Looking Statements.”

***PG&E Corporation and the Utility may incur material liability in connection with the Butte fire.***

On April 28, 2016, Cal Fire released its report of the investigation of the origin and cause of the “Butte fire,” the wildfire that ignited and spread in Amador and Calaveras Counties in Northern California in September 2015. Cal Fire’s report concluded that the wildfire was caused when a Gray Pine tree contacted an electric line of the Utility, which ignited portions of the tree, and determined that the failure by the Utility and its vegetation management contractors to identify certain potential hazards during its vegetation management program ultimately led to the failure of the tree. In a press release also issued on April 28, 2016, Cal Fire indicated that it will seek to recover firefighting costs in excess of $90 million from the Utility.

Approximately 44 individual complaints have been filed to date against the Utility and its vegetation management contractors in the Superior Court of California in both the County of Calaveras and the County of San Francisco, involving approximately 1,550 individual plaintiffs and their insurance companies. These complaints are now pending in a coordinated proceeding in the Superior Court of California for the County of Sacramento and part of two master complaints. The number of individual complaints and plaintiffs may increase in the future.

PG&E Corporation’s and the Utility’s financial statements for the period ended June 30, 2016 reflect a provision of $350 million for property damages in connection with this matter, which corresponds to the lower end of the range of its reasonably estimable losses. This amount is based on estimates about the number, size, and type of structures damaged or destroyed, and assumptions about the contents of such structures and other property damage. The Utility currently is unable to reasonably estimate the upper end of the range because it is at an early stage of the evaluation of claims and the mediation and settlement process. A change in management’s estimates or assumptions could result in an adjustment that could have a material impact on PG&E Corporation’s and the Utility’s financial condition and results of operations during the period in which such change occurred. The Utility also could incur material charges related to fire suppression, personal injury damages and other damages.

The Utility has insurance coverage for third party claims. At June 30, 2016, the Utility recorded $260 million for probable insurance recoveries in connection with recovery of losses related to the Butte fire. The Utility plans to seek full recovery of all insured losses and while the Utility believes that a significant portion of costs incurred for third-party claims (and associated legal expenses) relating to Butte fire will ultimately be recovered through its insurance, it is unable to predict the amount and timing of such insurance recoveries. If the amount of insurance is insufficient to cover such losses, or if insurance is otherwise unavailable, PG&E Corporation’s and the Utility’s financial condition, results of operations, or cash flows could be materially affected.

The Utility also could be subject to material fines, or penalties or disallowances if the CPUC or other law enforcement agency brought enforcement action against the Utility.

***The Utility’s operational and information technology systems could fail to function properly or be improperly accessed or damaged by third parties (including cyberand physical attacks) or damaged by severe weather, natural disasters, or other events. Any of these events could disrupt the Utility’s operations and cause the Utility to incur unanticipated losses and expense or liability.***

The operation of the Utility’s extensive electricity and natural gas systems relies on evolving and increasingly complex operational and information technology systems and network infrastructures that are interconnected with the systems and network infrastructure owned by third parties. All of the Utility’s operational and technology systems and network infrastructure are vulnerable to disability or failures in the event of cyber and physical attacks. Cyberattacks are increasingly sophisticated and may include computer hacking, viruses, malware, social engineering, denial of service attacks, ransomware, destructive malware, or other means of disruption, destruction, or unauthorized access, acquisition or control. In addition, hardware, software, or applications the Utility develops or procures from third parties may contain defects in design or manufacture or other problems that could unexpectedly compromise information security. Physical attacks may include acts of sabotage, acts of war, acts of terrorism, or other physical acts. The Utility’s operational and information technology systems and networks are deemed critical infrastructure, and any failure or decrease in their functionality could, among other things, cause harm to the public or employees, significantly disrupt operations,negatively impact the Utility’s ability to generate, transport, deliver and store energy and gas, or otherwise operate in the most efficient manner or at all, undermine the Utility’s performance of critical business functions, damage the Utility’s assets or operations or those of third parties, and lead to reputational harm. As a result, such events could subject the Utility to significant expenses, claims by customers or third parties, government inquiries, investigations, regulatory actions that could result in fines and penalties, and loss of customers, any of which could have a material effect on PG&E Corporation’s and the Utility’s financial condition and results of operations.

The Utility’s systems, including its financial information, operational systems, advanced metering, and billing systems, require ongoing maintenance, modification, and updating, which can be costly and increase the risk of errors and malfunction. The Utility often relies on third-party vendors to host, maintain, modify, and update its systems and these third-party vendors could cease to exist, fail to establish adequate processes to protect the Utility’s systems and information, or experience internal or external security incidents. Any incidents, disruptions or deficiencies in existing systems, or disruptions, delays or deficiencies in the modification of existing systems or implementation of new systems could result in increased costs, the inability to track or collect revenues, or diversion of management’s and employees’ attention and resources, or negatively affect the Utility’s ability to maintain effective financial controls or timely file required regulatory reports. The Utility also could be subject to patent infringement claims arising from the use of third-party technology by the Utility or by a third-party vendor.

In addition, the Utility’s information systems contain confidential information, including information about customers and employees. A data breach involving theft, improper disclosure, or other unauthorized access to or acquisition of confidential information could subject the Utility to penalties for violation of applicable privacy laws, claims by third parties, and enforcement actions by government agencies. It could also reduce the value of proprietary information, and harm the Utility’s reputation.

The Utility and its third party vendors have been subject, and will likely continue to be subject, to attempts to gain unauthorized access to the Utility’s information technology systems, or confidential data, or to disrupt the Utility’s operations. None of these attempts or breaches has individually or in the aggregate resulted in a security incident with a material impact on PG&E Corporation’s and the Utility’s financial condition and results of operations. Despite implementation of security and control measures, there can be no assurance that the Utility will be able to prevent the unauthorized access to its systems, infrastructure, or data, or the disruption of its operations, either of which could materially affect PG&E Corporation’s and the Utility’s financial condition and results of operations.

While the Utility maintains cyber liability insurance that covers certain damages caused by cyber incidents, there is no guarantee that adequate insurance will continue to be available at rates the Utility believes are reasonable or that the costs of responding to and recovering from a cyber incident will be covered by insurance or recoverable in rates.

***The operation and decommissioning of the Utility’s nuclear power plants expose it to potentially significant liabilities and the Utility may not be able to fully recover its costs if regulatory requirements change or the plant ceases operations before the licenses expire.***

The operation of the Utility’s nuclear generation facilities exposes it to potentially significant liabilities from environmental, health and financial risks, such as risks relating to the storage, handling and disposal of spent nuclear fuel, and the release of radioactive materials caused by a nuclear accident, seismic activity, natural disaster, or terrorist act. If the Utility incurs losses that are either not covered by insurance or exceed the amount of insurance available, such losses could have a material effect on PG&E Corporation’s and the Utility’s financial results. In addition, the Utility may be required under federal law to pay up to $255 million of liabilities arising out of each nuclear incident occurring not only at the Utility’s Diablo Canyon facility but at any other nuclear power plant in the United States. (See Note 13 of the Notes to the Consolidated Financial Statements in the 2015 Form 10-K.)

On June 20, 2016, the Utility entered into a proposal to retire Diablo Canyon power plant at the expiration of its current operating licenses in 2024 and 2025, subject to certain regulatory approvals. However, the Utility continues to face public concern about the safety of nuclear generation and nuclear fuel. Some of these nuclear opposition groups regularly file petitions at the NRC and in other forums challenging the actions of the NRC and urging governmental entities to adopt laws or policies in opposition to nuclear power. Although an action in opposition may ultimately fail, regulatory proceedings may take longer to conclude and be more costly to complete. It is also possible that public pressure could grow leading to adverse changes in legislation, regulations, orders, or their interpretation. As a result, operations at the Utility’s two nuclear generation units at Diablo Canyon could cease before the licenses expire in 2024 and 2025. In such an instance, the Utility could be required to record a charge for the remaining amount of its unrecovered investment and such charge could have a material effect on PG&E Corporation and the Utility’s financial results.

The Utility has incurred, and may continue to incur, substantial costs to comply with NRC regulations and orders. (See “Regulatory Environment” in Item 1. Business in the 2015 Form 10-K.) If the Utility were unable to recover these costs, PG&E Corporation’s and the Utility’s financial results could be materially affected. The Utility may determine that it cannot comply with the new regulations or orders in a feasible and economic manner and voluntarily cease operations; alternatively, the NRC may order the Utility to cease operations until the Utility can comply with new regulations, orders, or decisions. The Utility may incur a material charge if it ceases operations at Diablo Canyon before the licenses expire in 2024 and 2025. At June 30, 2016, the Utility’s unrecovered investment in Diablo Canyon was $2.3 billion.

At the state level, the California Water Board has adopted a policy on once-through cooling that generally requires the installation of cooling towers or other significant measures to reduce the impact on marine life from existing power generation facilities in California by at least 85%. If the California Water Board requires the installation of cooling towers that the Utility believes are not technically or economically feasible, the Utility may be forced to cease operations at Diablo Canyon and may incur a material charge. If the Utility obtains contingent approvals referred to herein that will result in retiring Diablo Canyon at the end of the current NRC operating licenses, the Utility will not be required to install cooling towers or implement alternative measures in order to comply with the California State Water Board Once-Through Cooling Water Policy, thus eliminating the risk of regulatory uncertainty regarding the measures that could have been imposed on the Utility or of incurring a material charge related thereto. Even if the Utility is ultimately not required to install cooling towers, under the State Water Board’s interim mitigation measures applicable to Diablo Canyon’s operations prior to 2025, starting in 2016, it will be required to make payments to the California Coastal Conservancy to fund various environmental mitigation projects, that the Utility does not expect to exceed $5 million per year.

On June 28, 2016 the California State Lands Commission approved an extension of the Utility’s leases of coastal land occupied by the water intake and discharge structures for the nuclear generation units at Diablo Canyon, to run concurrently with Diablo Canyon’s current operating licenses. The Utility will be required to obtain an additional lease extension from the State Lands Commission to cover the period of time necessary to decommission the facility. The State Lands Commission and California Coastal Commission will evaluate appropriate environmental mitigation and development conditions associated with the decommissioning project, the costs of which could be substantial.

The Utility also has an obligation to decommission its electricity generation facilities, including its nuclear facilities, as well as gas transmission system assets, at the end of their useful lives. (See Note 2: Summary of Significant Accounting Policies – Asset Retirement Obligations of the Notes to the Consolidated Financial Statement in Item 8.) The CPUC authorizes the Utility to recover its estimated costs to decommission its nuclear facilities through nuclear decommissioning charges that are collected from customers and held in nuclear decommissioning trusts to be used for the eventual decommissioning of each nuclear unit. If the Utility’s actual decommissioning costs, including the amounts held in the nuclear decommissioning trusts, exceed estimated costs, PG&E Corporation’s and the Utility’s financial results could be materially affected.