# PG&E Corp: Form 10-Q for the period ended Mar 31, 2017

- Company: [PG&E Corp](/companies/pcg.md) (CIK 1004980)
- Form: 10-Q
- Filed: 2017-05-02
- Accepted by EDGAR: May 2, 2017, 19:07 ET
- Period: 2017-03-31
- Accession: 0001004980-17-000012
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/1004980/000100498017000012/form10q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/1004980/000100498017000012/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2017-03-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2017-01-01 to 2017-03-31 | $4.27bn | us-gaap:Revenues |
| Operating income | 3 months, 2017-01-01 to 2017-03-31 | $880.0m | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2017-01-01 to 2017-03-31 | $218.0m | us-gaap:InterestExpense |
| Income tax | 3 months, 2017-01-01 to 2017-03-31 | $109.0m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2017-01-01 to 2017-03-31 | $579.0m | us-gaap:ProfitLoss |
| Diluted EPS | 3 months, 2017-01-01 to 2017-03-31 | $1.13 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2017-01-01 to 2017-03-31 | $1.13 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2017-01-01 to 2017-03-31 | 511,000,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months, 2017-01-01 to 2017-03-31 | $1.57bn | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 3 months, 2017-01-01 to 2017-03-31 | $1.22bn | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Dividends paid | 3 months, 2017-01-01 to 2017-03-31 | $243.0m | us-gaap:PaymentsOfDividendsCommonStock |
| Cash and equivalents | at 2017-03-31 | $164.0m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2017-03-31 | $5.98bn | us-gaap:AssetsCurrent |
| Total assets | at 2017-03-31 | $69.16bn | us-gaap:Assets |
| Current liabilities | at 2017-03-31 | $6.54bn | us-gaap:LiabilitiesCurrent |
| Long-term debt | at 2017-03-31 | $16.81bn | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2017-03-31 | $700.0m | us-gaap:LongTermDebtCurrent |
| Short-term borrowings | at 2017-03-31 | $763.0m | us-gaap:ShortTermBorrowings |
| Shareholders' equity | at 2017-03-31 | $18.35bn | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 97,750 characters.

### RESULTS OF OPERATIONS

### OVERVIEW

PG&E Corporation is a holding company whose primary operating subsidiary is Pacific Gas and Electric Company, a public utility serving northern and central California. The Utility generates revenues mainly through the sale and delivery of electricity and natural gas to customers.

The Utility is regulated primarily by the CPUC and the FERC. The CPUC has jurisdiction over the rates, terms, and conditions of service for the Utility’s electricity and natural gas distribution operations, electric generation, and natural gas transportation and storage. The FERC has jurisdiction over the rates and terms and conditions of service governing the Utility’s electric transmission operations and interstate natural gas transportation contracts. The NRC oversees the licensing, construction, operation, and decommissioning of the Utility’s nuclear generation facilities. The Utility is also subject to the jurisdiction of other federal, state, and local governmental agencies.

This is a combined quarterly report of PG&E Corporation and the Utility and should be read in conjunction with each company’s separate Condensed Consolidated Financial Statements and the Notes to the Condensed Consolidated Financial Statements included in this quarterly report. It also should be read in conjunction with the 2016 Form 10-K.

### Summary of Changes in Net Income and Earnings per Share

The following table is a summary reconciliation of the key changes in PG&E Corporation’s income available for common shareholders and EPS (as well as earnings from operations and EPS based on earnings from operations) compared to the same period in the prior year (see “Results of Operations” below). “Earnings from operations” is a non-GAAP financial measure and is calculated as income available for common shareholders less items impacting comparability. “Items impacting comparability” represent items that management does not consider part of the normal course of operations and affect comparability of financial results between periods. PG&E Corporation uses earnings from operations to understand and compare operating results across reporting periods for various purposes including internal budgeting and forecasting, short and long-term operating plans, and employee incentive compensation. PG&E Corporation believes that earnings from operations provide additional insight into the underlying trends of the business allowing for a better comparison against historical results and expectations for future performance. Earnings from operations are not a substitute or alternative for GAAP measures such as income available for common shareholders and may not be comparable to similarly titled measures used by other companies.

*(in millions, except per share amounts)*

|  | Three Months Ended March 31, Earnings (1) | EPS (diluted) |
| --- | ---: | ---: |
| **PG&E Corporation’s Earnings on a GAAP basis - 2017** | **$576** | **$1.13** |
| Fines and penalties (3) | 36 | 0.07 |
| Pipeline-related expenses (4) | 16 | 0.03 |
| Butte fire related costs (net of insurance) (5) | 2 | - |
| Legal and regulatory related expenses (6) | 2 | - |
| GT&S revenue timing impact (7) | (88) | (0.17) |
| **PG&E Corporation's Earnings from Operations - 2017 (2)** | **$544** | **$1.06** |
| **PG&E Corporation’s Earnings on a GAAP basis - 2016** | **$107** | **$0.22** |
| Butte fire related costs (net of insurance) (8) | 226 | 0.45 |
| Fines and penalties (9) | 51 | 0.10 |
| Pipeline-related expenses (10) | 13 | 0.03 |
| Legal and regulatory related expenses (10) | 10 | 0.02 |
| **PG&E Corporation's Earnings from Operations - 2016 (2)** | **$407** | **$0.82** |
| Timing of 2015 GT&S revenue impact (11) | 75 | 0.15 |
| Tax benefit on stock compensation (12) | 31 | 0.06 |
| Growth in rate base earnings | 17 | 0.03 |
| Miscellaneous | 29 | 0.05 |
| Timing of 2017 GRC decision (13) | (15) | (0.03) |
| Increase in shares outstanding | - | (0.02) |
| **PG&E Corporation's Earnings from Operations - 2017 (2)** | **$544** | **$1.06** |

(1) Tax effect is performed at PG&E Corporation’s statutory tax rate of 40.75% except for fines, which are not tax deductible. See footnote (3) below.

(2) “Earnings from operations” is not calculated in accordance with GAAP and excludes the items impacting comparability shown in footnotes (3) through (10).

(3) The Utility incurred costs of $60 million (before the tax impact of $24 million) during the three months ended March 31, 2017 associated with fines and penalties. This includes costs of $32 million (before the tax impact of $13 million) during the three months ended March 31, 2017 associated with safety-related cost disallowances imposed by the CPUC in its April 9, 2015 decision in the gas transmission pipeline investigations. The Utility also recorded $15 million (before the tax impact of $6 million) during the three months ended March 31, 2017 for disallowances imposed by the CPUC in its final phase two decision of the 2015 GT&S rate case for prohibited ex parte communications. In addition, the Utility accrued financial remedies of $12 million (before the tax impact of $5 million), and $1 million (which is not tax deductible), during the three months ended March 31, 2017, in connection with the settlement filed with the CPUC on March 28, 2017 related to the Order Instituting an Investigation into Compliance with Ex Parte Communication Rules. Future fines or penalties may be imposed in connection with other enforcement, regulatory, and litigation activities regarding natural gas matters and regulatory communications.

(4) The Utility incurred costs of $28 million (before the tax impact of $12 million) during the three months ended March 31, 2017 for pipeline related expenses incurred in connection with the multi-year effort to identify and remove encroachments from transmission pipeline rights of way.

(5) The Utility recorded costs of $3 million (before the tax impact of $1 million) during the three months ended March 31, 2017 associated with the Butte fire, net of insurance. This includes charges of $10 million (before the tax impact of $4 million) related to legal costs associated with the Butte fire, partially offset by $7 million (before the tax impact of $3 million) of probable insurance recovery.

(6) The Utility incurred costs of $4 million (before the tax impact of $2 million) during the three months ended March 31, 2017 for legal and regulatory related expenses incurred in connection with various enforcement, regulatory, and litigation activities regarding natural gas matters and regulatory communications.

(7) As a result of the CPUC’s final phase two decision in the 2015 GT&S rate case, during the three months ended March 31, 2017, the Utility recorded revenues of $150 million (before the tax impact of $62 million) in excess of the 2017 authorized revenue requirement, which includes the final component of under-collected revenues retroactive to January 1, 2015.

(8) For the three months ended March 31, 2016, the Utility incurred charges of $350 million (before the tax impact of $142 million) related to estimated property damages in connection with the Butte fire and $31 million (before the tax impact of $13 million) for Utility clean-up, repair, and legal costs associated with the Butte fire.

(9) Represents disallowed capital charges of $87 million (before the tax impact of $36 million) during the three months ended March 31, 2016.

(10) Represents pipeline-related expenses of $22 million (before the tax impact of $9 million) during the three months ended March 31, 2016, including costs incurred to identify and remove encroachments from transmission pipeline rights of way. Legal and regulatory related expenses of $17 million (before the tax impact of $7 million) during the three months ended March 31, 2016 include various enforcement, regulatory, and litigation activities regarding natural gas matters and regulatory communications.

(11) Represents the impact in 2016 of the delay in the Utility’s 2015 GT&S rate case. The CPUC issued its final phase two decision on December 1, 2016, delaying recognition of the full 2016 revenue increase until the fourth quarter of 2016.

(12) Represents the incremental tax benefit related to share-based compensation awards that vested during the three months ended March 31, 2017. Pursuant to ASU 2016-09, which PG&E Corporation and the Utility adopted in 2016, excess tax benefits associated with vested awards are reflected in net income.

(13) Represents the increase in GRC-related capital costs (depreciation and interest) but does not include an offsetting revenue increase, which is pending a final decision in the Utility’s 2017 GRC proceeding.

### Key Factors Affecting Financial Results

PG&E Corporation and the Utility believe that their future results of operations, financial condition, and cash flows will be materially affected by the following factors:

*The Outcome of Enforcement, Litigation, and Regulatory Matters.* The Utility’s future financial results may continue to be impacted by the outcome of current and future enforcement, litigation, and regulatory matters, including the Butte fire litigation, related insurance recoveries, and the effect, if any, that the SED’s $8.3 million citations issued in connection with the Butte fire may have on such litigation, the ex parte OII and the related settlement agreement that is subject to the CPUC approval, the probation and monitorship imposed as a result of the Utility’s conviction in the federal criminal trial and potential recommendations that the monitor may make, and potential penalties in connection with the Utility’s safety and other self-reports. (See Item 1A. Risk Factors in the 2016 Form 10-K.)

*The Timing and Outcome of Ratemaking Proceedings.* The Utility’s results may be impacted by the timing and outcome of its 2017 GRC, FERC TO rate case, and petition for modification related to its cost of capital. (See “2017 General Rate Case,” “Transmission Owner Rate Case,” and “Cost of Capital” in “Regulatory Matters” below for more information.) The outcome of regulatory proceedings can be affected by many factors, including arguments made by intervening parties, potential rate impacts, the Utility’s reputation, the regulatory and political environments, and other factors.

*The Ability of the Utility to Control and Recover Operating Costs and Capital Expenditures.* The Utility is committed to delivering safe, reliable, sustainable, and affordable electric and gas services to its customers. Increasing demands from state laws and policies relating to increased renewable energy resources, the reduction of GHG emissions, the expansion of energy efficiency programs, the development and widespread deployment of distributed generation and self-generation resources, and the development of energy storage technologies have increased pressure on the Utility to achieve efficiencies in its operations in order to maintain the affordability of its service. In any given year the Utility’s ability to earn its authorized rate of return depends on its ability to manage costs within the amounts authorized in rate case decisions. The Utility forecasts that in 2017 it will incur unrecovered pipeline-related expenses ranging from $80 million to $125 million which primarily relate to costs to identify and remove encroachments from transmission pipeline rights-of-way. Also, the CPUC decision in the Utility’s 2015 GT&S rate case establishes various cost caps that will increase the risk of overspend over the rate case cycle through 2018. (See Note 9 of the Notes to the Condensed Consolidated Financial Statements in Item 1.)

*The Amount and Timing of the Utility’s Financing Needs.* PG&E Corporation contributes equity to the Utility as needed to maintain the Utility’s CPUC-authorized capital structure. For the three months ended March 31, 2017, PG&E Corporation issued $150 million of common stock and used $125 million of the cash proceeds to make equity contributions to the Utility. PG&E Corporation forecasts that it will continue issuing a material amount of equity in future years, including $400 million to $600 million in 2017, primarily to support the Utility’s capital expenditures. PG&E Corporation may issue additional equity to fund unrecoverable pipeline-related expenses and to pay fines and penalties that may be required by the final outcomes of pending enforcement matters. These additional issuances could have a material dilutive impact on PG&E Corporation’s EPS. PG&E Corporation’s and the Utility’s ability to access the capital markets and the terms and rates of future financings could be affected by the outcome of the matters discussed in Note 9 of the Notes to the Condensed Consolidated Financial Statements in Item 1, changes in their respective credit ratings, general economic and market conditions, and other factors.

For more information about the factors and risks that could affect future results of operations, financial condition, and cash flows, or that could cause future results to differ from historical results, see “Item 1A. Risk Factors” in the 2016 Form 10-K and in Part II below under “Item 1A. Risk Factors.” In addition, this quarterly report contains forward-looking statements that are necessarily subject to various risks and uncertainties. These statements reflect management’s judgment and opinions that are based on current estimates, expectations, and projections about future events and assumptions regarding these events and management’s knowledge of facts as of the date of this report. See the section entitled “Forward-Looking Statements” below for a list of some of the factors that may cause actual results to differ materially. PG&E Corporation and the Utility are not able to predict all the factors that may affect future results and do not undertake an obligation to update forward-looking statements, whether in response to new information, future events, or otherwise.

### RESULTS OF OPERATIONS

The consolidated results of operations consist primarily of results related to the Utility, which are discussed in the “Utility” section below. The following table provides a summary of net income available for common shareholders for the three months ended March 31, 2017 and 2016:

*(in millions)*

|  | Three Months Ended March 31, 2017 | 2016 |
| --- | ---: | ---: |
| Consolidated Total | $576 | $107 |
| PG&E Corporation | 10 | 2 |
| Utility | $566 | $105 |

PG&E Corporation’s net income primarily consists of income taxes and interest expense on long-term debt. The increase in PG&E Corporation’s net income for the three months ended March 31, 2017 as compared to the same period in 2016 is primarily due to the effect of income tax benefits.

### Utility

The table below shows certain items from the Utility’s Condensed Consolidated Statements of Income for the three months ended March 31, 2017 and 2016. The table separately identifies the revenues and costs that impacted earnings from those that did not impact earnings. In general, expenses the Utility is authorized to pass through directly to customers (such as costs to purchase electricity and natural gas, as well as costs to fund public purpose programs), and the corresponding amount of revenues collected to recover those pass-through costs, do not impact earnings. In addition, expenses that have been specifically authorized (such as the payment of pension costs) and the corresponding revenues the Utility is authorized to collect to recover such costs, do not impact earnings.

Revenues that impact earnings are primarily those that have been authorized by the CPUC and the FERC to recover the Utility’s costs to own and operate its assets and to provide the Utility an opportunity to earn its authorized rate of return on rate base. Expenses that impact earnings are primarily those that the Utility incurs to own and operate its assets.

*(in millions)*

|  | Three Months Ended March 31, 2017 Revenues and Costs: That Impacted Earnings | That Did Not Impact Earnings | Total Utility | Three Months Ended March 31, 2016 Revenues and Costs: That Impacted Earnings | That Did Not Impact Earnings | Total Utility |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Electric operating revenues | $1,982 | $1,085 | $3,067 | $1,933 | $1,199 | $3,132 |
| Natural gas operating revenues | 777 | 427 | 1,204 | 523 | 320 | 843 |
| **Total operating revenues** | **2,759** | **1,512** | **4,271** | **2,456** | **1,519** | **3,975** |
| Cost of electricity | - | 847 | 847 | - | 950 | 950 |
| Cost of natural gas | - | 325 | 325 | - | 222 | 222 |
| Operating and maintenance | 1,164 | 340 | 1,504 | 1,664 | 347 | 2,011 |
| Depreciation, amortization, and decommissioning | 712 | - | 712 | 696 | - | 696 |
| **Total operating expenses** | **1,876** | **1,512** | **3,388** | **2,360** | **1,519** | **3,879** |
| **Operating income** | **$883** | **$-** | **$883** | **$96** | **$-** | **$96** |
| Interest income (1) |  |  | 5 |  |  | 4 |
| Interest expense (1) |  |  | (216) |  |  | (201) |
| Other income, net (1) |  |  | 17 |  |  | 24 |
| Income (loss) before income taxes |  |  | 689 |  |  | (77) |
| Income tax provision (benefit) (1) |  |  | 120 |  |  | (185) |
| Net income |  |  | 569 |  |  | 108 |
| Preferred stock dividend requirement (1) |  |  | 3 |  |  | 3 |
| **Income Available for Common Stock** |  |  | **$566** |  |  | **$105** |

(1) These items impacted earnings for the three months ended March 31, 2017 and 2016.

### Utility Revenues and Costs that Impacted Earnings

The following discussion presents the Utility’s operating results for the three months ended March 31, 2017 and 2016, focusing on revenues and expenses that impacted earnings for these periods.

#### Operating Revenues

The Utility’s electric and natural gas operating revenues that impacted earnings increased by $303 million, or 12%, in the three months ended March 31, 2017, compared to the same period in 2016 primarily due to additional base revenues authorized by the CPUC in the 2015 GT&S rate case and by the FERC in the TO rate case. The final 2015 GT&S rate case decision authorized the Utility to collect, over a 36-month period, the difference between adopted revenue requirements and amounts previously collected in rates, retroactive to January 1, 2015, beginning August 1, 2016. Accounting rules allow the Utility to recognize revenues in a given year only if they will be collected from customers within 24 months of the end of that year. As a result, the Utility recognized $102 million in the first quarter of 2017 related to remaining retroactive revenues that had not previously been recognized. (See “Regulatory Matters” below.)

#### Operating and Maintenance

The Utility’s operating and maintenance expenses that impacted earnings decreased by $500 million, or 30%, in the three months ended March 31, 2017 compared to the same period in 2016 primarily due to approximately $375 million in higher charges related to the Butte fire (see Note 9 of the Notes to the Condensed Consolidated Financial Statements) and $87 million of disallowed capital charges in the first quarter of 2016 with no corresponding charges in 2017.

The Utility’s future financial statements will continue to be impacted by additional charges associated with costs related to the Butte fire and unrecoverable pipeline-related expenses. (See “Key Factors Affecting Financial Results” above and Note 9 of the Notes to the Condensed Consolidated Financial Statements.)

#### Depreciation, Amortization, and Decommissioning

The Utility’s depreciation, amortization, and decommissioning expenses increased by $16 million, or 2%, in the three months ended March 31, 2017 compared to the same period in 2016 primarily due to capital additions.

#### Interest Income, Interest Expense, and Other Income, Net

There were no material changes to interest income, interest expense, and other income, net for the periods presented.

#### Income Tax Provision

The income tax provision increased by $305 million in the three months ended March 31, 2017 as compared to the same period in 2016. The increase in the income tax provision was primarily the result of the statutory tax effect of pre-tax income in 2017 as compared to a pre-tax loss in 2016. The effective tax rates for the three months ended March 31, 2017 and 2016 were 17% and 241%, respectively. The decrease in effective tax rate is primarily due to a pre-tax loss combined with tax benefits resulting from various tax audit results in the three months ended March 31, 2016 with no comparable amounts during the same period in 2017.

### Utility Revenues and Costs that did not Impact Earnings

Fluctuations in revenues that did not impact earnings are primarily driven by electricity and natural gas procurement costs. See below for more information.

#### Cost of Electricity

The Utility’s cost of electricity includes the cost of power purchased from third parties (including renewable energy resources), transmission, fuel used in its own generation facilities, fuel supplied to other facilities under power purchase agreements, costs to comply with California’s cap-and-trade program, and realized gains and losses on price risk management activities. (See Note 7 of the Notes to the Condensed Consolidated Financial Statements.)

*(in millions)*

|  | Three Months Ended March 31, 2017 | 2016 |
| --- | ---: | ---: |
| Cost of purchased power | $784 | $886 |
| Fuel used in own generation facilities | 63 | 64 |
| **Total cost of electricity** | **$847** | **$950** |
| Average cost of purchased power per kWh (1) | $0.108 | $0.104 |
| **Total purchased power (in millions of kWh) (2)** | **7,291** | **8,539** |

(1) Cost of purchased power was impacted primarily by lower Utility electric customer demand and a larger percentage of higher cost renewable energy resources.

(2) The decrease in purchased power for the three months ended March 31, 2017 compared to the same period in 2016 was primarily due to lower Utility electric customer demand and an increase in generation from hydroelectric facilities.

The Utility’s total purchased power is driven by customer demand, the availability of the Utility’s own generation facilities (including Diablo Canyon and its hydroelectric plants), regulatory requirements to procure certain types of energy, and the cost-effectiveness of each source of electricity.

#### Cost of Natural Gas

The Utility’s cost of natural gas includes the costs of procurement, storage and transportation of natural gas, costs to comply with California’s cap-and-trade program, and realized gains and losses on price risk management activities. (See Note 7 of the Notes to the Condensed Consolidated Financial Statements.) The Utility’s cost of natural gas is impacted by the market price of natural gas, changes in the cost of storage and transportation, and changes in customer demand.

*(in millions)*

|  | Three Months Ended March 31, 2017 | 2016 |
| --- | ---: | ---: |
| Cost of natural gas sold | $293 | $181 |
| Transportation cost of natural gas sold | 32 | 41 |
| **Total cost of natural gas** | **$325** | **$222** |
| Average cost per Mcf of natural gas sold | $3.15 | $2.26 |
| **Total natural gas sold (in millions of Mcf (1))** | **93** | **80** |

(1) One thousand cubic feet

#### Operating and Maintenance Expenses

The Utility’s operating expenses also include certain recoverable costs that the Utility incurs as part of its operations such as pension contributions and public purpose programs costs. If the Utility were to spend over authorized amounts, these expenses could have an impact on earnings.

### LIQUIDITY AND FINANCIAL RESOURCES

### Overview

The Utility’s ability to fund operations, finance capital expenditures, and make distributions to PG&E Corporation depends on the levels of its operating cash flows and access to the capital and credit markets. The CPUC authorizes the Utility’s capital structure, the aggregate amount of long-term and short-term debt that the Utility may issue, and the revenue requirements the Utility is able to collect to recover its cost of capital. The Utility generally utilizes equity contributions from PG&E Corporation and long-term senior unsecured debt issuances to maintain its CPUC-authorized capital structure consisting of 52% equity and 48% debt and preferred stock. The Utility relies on short-term debt, including commercial paper, to fund temporary financing needs.

PG&E Corporation’s ability to fund operations, make scheduled principal and interest payments, fund equity contributions to the Utility, and pay dividends primarily depends on the level of cash distributions received from the Utility and PG&E Corporation’s access to the capital and credit markets. PG&E Corporation has material stand-alone cash flows related to the issuance of equity and long-term debt, dividend payments, and issuances and repayments under its revolving credit facility and commercial paper program. PG&E Corporation relies on short-term debt, including commercial paper, to fund temporary financing needs.

PG&E Corporation’s equity contributions to the Utility are funded primarily through common stock issuances. PG&E Corporation forecasts that it will issue between $400 million and $600 million in common stock during 2017, primarily to fund equity contributions to the Utility. The Utility’s equity needs will continue to be affected by the timing and outcome of unrecoverable pipeline-related expenses, and by fines, penalties and claims that may be imposed in connection with the matters described in “Enforcement and Litigation Matters” below. Common stock issuances by PG&E Corporation to fund these needs could have a material dilutive impact on PG&E Corporation’s EPS.

### Cash and Cash Equivalents

Cash and cash equivalents consist of cash and short-term, highly liquid investments with original maturities of three months or less. PG&E Corporation and the Utility maintain separate bank accounts and primarily invest their cash in money market funds.

### Financial Resources

### Debt and Equity Financings

In February 2017, PG&E Corporation amended its February 2015 equity distribution agreement providing for the sale of PG&E Corporation common stock having an aggregate gross price of up to $275 million. During the three months ended March 31, 2017, PG&E Corporation sold 0.4 million shares of its common stock under the February 2017 equity distribution agreement for cash proceeds of $28 million, net of commissions paid of $0.2 million. As of March 31, 2017, the remaining gross sales available under this agreement were $246 million.

PG&E Corporation also issued common stock under the PG&E Corporation 401(k) plan, the Dividend Reinvestment and Stock Purchase Plan, and share-based compensation plans. During the three months ended March 31, 2017, 3.3 million shares were issued for cash proceeds of $117 million under these plans.

The proceeds from these sales were used for general corporate purposes, including the contribution of equity to the Utility. For the three months ended March 31, 2017, PG&E Corporation made equity contributions to the Utility of $125 million.

In February 2017, the Utility’s $250 million floating rate unsecured term loan, issued in March 2016, matured and was repaid. Additionally, in February 2017, the Utility entered into a $250 million floating rate unsecured term loan that matures on February 22, 2018. In March 2017, the Utility issued $400 million principal amount of 3.30% Senior Notes due March 15, 2027 and $200 million principal amount of 4.00% Senior Notes due December 1, 2046. The proceeds were used for general corporate purposes, including the repayment of a portion of the Utility’s outstanding commercial paper.

### Revolving Credit Facilities and Commercial Paper Programs

At March 31, 2017, PG&E Corporation and the Utility had $300 million and $2.7 billion available under their respective $300 million and $3.0 billion revolving credit facilities. (See Note 4 of the Notes to the Condensed Consolidated Financial Statements.)

PG&E Corporation and the Utility can issue commercial paper up to the maximum amounts of $300 million and $2.5 billion, respectively. For the three months ended March 31, 2017, PG&E Corporation and the Utility had an average outstanding commercial paper balance of $42 million and $754 million, and a maximum outstanding balance of $147 million and $1.1 billion, respectively. At March 31, 2017, the Utility had an outstanding commercial paper balance of $263 million and PG&E Corporation did not have any commercial paper outstanding.

The revolving credit facilities require that PG&E Corporation and the Utility maintain a ratio of total consolidated debt to total consolidated capitalization of at most 65% as of the end of each fiscal quarter. At March 31, 2017, PG&E Corporation’s and the Utility’s total consolidated debt to total consolidated capitalization was 50% and 49%, respectively. PG&E Corporation’s revolving credit facility agreement also requires that PG&E Corporation own, directly or indirectly, at least 80% of the common stock and at least 70% of the voting capital stock of the Utility. In addition, the revolving credit facilities include usual and customary provisions regarding events of default and covenants including covenants limiting liens to those permitted under PG&E Corporation’s and the Utility’s senior note indentures, mergers, and imposing conditions on the sale of all or substantially all of PG&E Corporation’s and the Utility’s assets and other fundamental changes. At March 31, 2017, PG&E Corporation and the Utility were in compliance with all covenants under their respective revolving credit facilities.

### Dividends

In February 2017, the Board of Directors of PG&E Corporation declared quarterly dividends of $0.49 per share, totaling $250 million, of which approximately $245 million was paid on April 15, 2017, to shareholders of record on March 31, 2017.

In February 2017, the Board of Directors of the Utility declared a common stock dividend of $244 million that was paid to PG&E Corporation on February 17, 2017.

In February 2017, the Board of Directors of the Utility declared dividends on its outstanding series of preferred stock, payable on May 15, 2017, to shareholders of record on April 28, 2017.

### Utility Cash Flows

The Utility’s cash flows were as follows:

*(in millions)*

|  | Three Months Ended March 31, 2017 | 2016 |
| --- | ---: | ---: |
| Net cash provided by operating activities | $1,598 | $1,096 |
| Net cash used in investing activities | (1,235) | (1,250) |
| Net cash provided by (used in) financing activities | (374) | 139 |
| **Net change in cash and cash equivalents** | **$(11)** | **$(15)** |

### Operating Activities

The Utility’s cash flows from operating activities primarily consist of receipts from customers less payments of operating expenses, other than expenses such as depreciation that do not require the use of cash. During the three months ended March 31, 2017, net cash provided by operating activities increased by $502 million compared to the same period in 2016. This increase was primarily due to additional electric and natural gas operating revenues collected as authorized by the CPUC in the 2015 GT&S rate case and by the FERC in the TO rate case. The remaining increase was primarily due to fluctuations in activities within the normal course of business such as the timing and amount of customer billings and collections and vendor billings and payments.

Future cash flow from operating activities will be affected by various factors, including:

the timing and outcome of ratemaking proceedings, including the 2017 GRC and the TO rate case, and cost of capital proceeding;

the timing and amounts of costs that may be incurred in connection with claims associated with Butte fire, the timing and amount of related insurance recoveries, and the effect, if any, that the SED's $8.3 million citations issued in connection with the Butte fire may have on such litigation, the ex parte OII, fines or penalties that may be imposed in connection with the ex parte OII and the outcome of the related settlement agreement that is subject to the CPUC approval, fines or penalties that may be imposed in connection with other enforcement and litigation matters, costs associated with the probation and monitorship imposed as a result of the Utility’s conviction in the federal criminal trial and potential recommendations by the monitor, and potential penalties in connection with the Utility's safety and other self-reports;

the timing and amount of costs the Utility incurs, but does not recover, associated with its electric and natural gas systems;

the timing and amount of tax payments (including the bonus depreciation), tax refunds, net collateral payments, and interest payments, as well as changes in tax regulations that could be adopted by Congress as a result of the new federal administration and other proposals; and

the timing of the resolution of the Chapter 11 disputed claims and the amount of principal and interest on these claims that the Utility will be required to pay.

### Investing Activities

Net cash used in investing activities decreased by $15 million during the three months ended March 31, 2017 as compared to the same period in 2016. The Utility’s investing activities primarily consist of construction of new and replacement facilities necessary to provide safe and reliable electricity and natural gas services to its customers. Cash used in investing activities also includes the proceeds from sales of nuclear decommissioning trust investments which are largely offset by the amount of cash used to purchase new nuclear decommissioning trust investments. The funds in the decommissioning trusts, along with accumulated earnings, are used exclusively for decommissioning and dismantling the Utility’s nuclear generation facilities.

Future cash flows used in investing activities are largely dependent on the timing and amount of capital expenditures. The Utility estimates that it will incur approximately $6.0 billion in capital expenditures in each of the years 2017, 2018, and 2019.

### Financing Activities

During the three months ended March 31, 2017, net cash used in financing activities increased by $513 million compared to the same period in 2016. Cash provided by or used in financing activities is driven by the Utility’s financing needs, which depend on the level of cash provided by or used in operating activities, the level of cash provided by or used in investing activities, the conditions in the capital markets, and the maturity date of existing debt instruments. The Utility generally utilizes long-term debt issuances and equity contributions from PG&E Corporation to maintain its CPUC-authorized capital structure, and relies on short-term debt to fund temporary financing needs.

### ENFORCEMENT AND LITIGATION MATTERS

PG&E Corporation and the Utility have significant contingencies arising from their operations, including contingencies related to the enforcement and litigation matters described in Note 9 of the Notes to the Condensed Consolidated Financial Statements. The outcome of these matters, individually or in the aggregate, could have a material effect on PG&E Corporation’s and the Utility’s future financial results. In addition, PG&E Corporation and the Utility are involved in other enforcement and litigation matters described in the 2016 Form 10-K and “Part II. Other Information, Item 1. Legal Proceedings.”

### REGULATORY MATTERS

The Utility is subject to substantial regulation by the CPUC, the FERC, the NRC and other federal and state regulatory agencies. Significant regulatory developments that have occurred since the 2016 Form 10-K was filed with the SEC are discussed below.

### 2017 General Rate Case

On February 27, 2017, the assigned ALJ issued a PD in the Utility’s 2017 GRC which will determine the annual amount of base revenues (or “revenue requirements”) that the Utility will be authorized to collect from customers from 2017 through 2019 to recover its anticipated costs for electric distribution, natural gas distribution, and electric generation operations and to provide the Utility an opportunity to earn its authorized rate of return.

The PD would approve, with certain modifications, the settlement agreement that the Utility, the ORA, TURN, and 12 other intervening parties jointly submitted to the CPUC on August 3, 2016 (the “settlement agreement”). The PD proposes a revenue requirement increase of $86 million for 2017. Consistent with the settlement agreement, the PD includes additional increases of $444 million in 2018 and $361 million in 2019. The PD would modify the settlement agreement in three principal ways.

First, the PD would broaden the proposed tax repair memorandum account. The account proposed in the settlement agreement would have been limited to certain new tax accounting changes and certain tax authority changes affecting repair deductions. In contrast, the PD indicates that the new account would track any revenue differences between the income tax expense forecast in the GRC and the tax expense incurred during the 2017 through 2019 GRC period. Specifically, the PD calls for tracking the differences resulting from (1) net revenue changes, (2) mandatory tax law changes, tax accounting changes, tax procedural changes, or tax policy changes, and (3) elective tax law changes, tax accounting changes, tax procedural changes, or tax policy changes. The PD proposes that the new account remain open and the balance in the account be reviewed in every subsequent GRC proceeding until a CPUC decision closes the account. While it is uncertain how the new account would be interpreted or implemented, income taxes are a significant component of the Utility’s cost of service and as a result the new account may materially impact authorized revenues over the 2017 GRC period.

Second, the PD would require the Utility to file a stand-alone application with the CPUC to recover customer outreach and other costs incurred as a result of residential rate reform implementation or seek such recovery in its next GRC application. The settlement agreement would have allowed the Utility to recover such costs, up to certain caps, through annual advice letters.

Third, the PD would increase the funding for the Utility’s Rule 20A undergrounding capital program by $24 million for 2017 with such funding subject to a one-way balancing account. This increased capital authorization would result in a $2 million reduction to the revenue requirement due to estimated tax-related benefits associated with the increased capital spending. Other than this adjustment, the PD proposes no changes to authorized capital expenditure or rate base levels as compared to the settlement agreement.

The PD also would resolve two contested issues that were identified in the settlement agreement. The PD would deny the proposed fourth year for the 2017 rate case cycle on the grounds that a four-year GRC cycle for the major California utilities is being considered by the CPUC in another proceeding. The PD also would deny the proposed new balancing account for gas leak management requirements that may arise from the separate CPUC rulemaking on gas leak abatement on the grounds that it should be considered in that rulemaking. In their comments to the PD submitted to the CPUC on March 20, 2017, the Utility and other settling parties requested to restore the terms of the settlement agreement.

Additionally, on April 4, 2017, the CPUC issued an alternate PD that proposes to restore the Rule 20A undergrounding capital program to the settlement agreement amount. As a result, the alternate PD proposes revenue requirement increases consistent with the settlement agreement of $88 million for 2017, with additional increases of $444 million in 2018 and $361 million in 2019. In their comments to the alternate PD submitted to the CPUC on April 24, 2017, the Utility and other settling parties recommended that the Rule 20A provisions in the alternate PD be adopted. In these comments, the Utility and other settling parties also recommended alternative provisions concerning the tax and residential rate reform issues mentioned above. These alternative provisions attempt to address the proposed decisions’ concerns in ways that more closely align with the original settlement agreement.

The table below summarizes the differences between the amount of revenue requirement increases included in the settlement agreement, PD, and alternate PD:

| Year | Increase Proposed in Settlement Agreement & Alternate PD (in millions) | Increase Proposed in PD (in millions) | Difference (Decrease) from PD to the Settlement Agreement & Alternate PD (in millions) |
| --- | ---: | ---: | ---: |
| 2017 | $88 | $86 | $(2) |
| 2018 | 444 | 444 | - |
| 2019 | 361 | 361 | - |

The following table shows the differences between the 2017 revenue requirements by line of business proposed in the settlement agreement, PD, and alternate PD:

| (in millions) Line of Business: | Increase (Decrease) Proposed in the Settlement Agreement & Alternate PD |  | Increase (Decrease) Proposed in PD |  | Difference (Decrease) from PD to the Settlement Agreement & Alternate PD |
| --- | ---: | ---: | ---: | ---: | ---: |
| Electric distribution | $(62) | (1.5)% | $(64) | (1.5)% | $(2) |
| Gas distribution | (3) | (0.2) | (3) | (0.2) | - |
| Electric generation | 153 | 7.8 | 153 | 7.8 | - |
| **2017 revenue requirement increases** | **$88** | **1.1%** | **$86** | **1.1%** | **$(2)** |

50

The following table shows the differences, based on line of business and cost category, between the revenue requirement amounts proposed in the settlement agreement, PD, and alternate PD, as well as the differences between the 2016 authorized revenue requirements and the amounts proposed in the settlement agreement, PD, and alternate PD:

*(in millions)*

| Line of Business: | Amounts Proposed in Settlement Agreement & Alternate PD | Amounts Proposed in PD | Difference (Decrease) | Increase/ (Decrease) 2016 vs. Settlement Agreement/ Alternate PD | Increase/ (Decrease) 2016 Amounts vs. PD |
| --- | ---: | ---: | ---: | ---: | ---: |
| Electric distribution | $4,151 | $4,149 | $(2) | $(62) | $(64) |
| Gas distribution | 1,738 | 1,738 | - | (3) | (3) |
| Electric generation | 2,115 | 2,115 | - | 153 | 153 |
| **Total revenue requirements** | **$8,004** | **$8,002** | **$(2)** | **$88** | **$86** |
| **Cost Category:** |  |  |  |  |  |
| (in millions) |  |  |  |  |  |
| Operations and maintenance | $1,794 | $1,794 | $- | $131 | $131 |
| Customer services | 334 | 334 | - | 15 | 15 |
| Administrative and general | 912 | 912 | - | (99) | (99) |
| Less: Revenue credits | (152) | (152) | - | (21) | (21) |
| Franchise fees, taxes other than |  |  |  |  |  |
| income, and other adjustments | 170 | 170 | - | 132 | 132 |
| Depreciation (including costs of asset |  |  |  |  |  |
| removal), return, and income taxes | 4,946 | 4,944 | (2) | (70) | (72) |
| **Total revenue requirements** | **$8,004** | **$8,002** | **$(2)** | **$88** | **$86** |

Reply comments were due on May 1, 2017. The Utility expects that the CPUC could vote on a final decision in its 2017 GRC as soon as May 11, 2017. For more information, see PG&E Corporation’s and the Utility’s 2016 Form 10-K.

### 2015 Gas Transmission and Storage Rate Case

During 2016, the CPUC approved final decisions in phase one and phase two of the Utility’s 2015 GT&S rate case. The phase one decision adopted the revenue requirements that the Utility is authorized to collect through rates beginning August 1, 2016, to recover its costs of gas transmission and storage services for the 2015 GT&S rate case period and phase two determined the allocation of the $850 million penalty assessed in the Penalty Decision and the revenue requirement reduction for the five-month delay caused by the Utility’s violation of the CPUC ex parte communication rules in this proceeding. The decision authorized the Utility to collect, over a 36-month period, the difference between adopted revenue requirements and amounts previously collected in rates, retroactive to January 1, 2015. Accounting rules allow the Utility to recognize revenues in a given year only if they will be collected from customers within 24 months of the end of that year. In adherence with accounting rules, the Utility completed recording $102 million of the retroactive revenue requirement increase in the first quarter of 2017.

The following table shows the revenue requirement amounts adopted in the Utility’s 2015 GT&S rate case including adjustments for the $850 million Penalty Decision disallowance and the ex parte disallowance:

*(in millions)*

|  | 2015 | 2016 | 2017 | 2018 |
| --- | ---: | ---: | ---: | ---: |
| Revenue Requirement Before Adjustments | $1,046 | $1,110 | $1,220 | $1,324 |
| San Bruno Penalty Expense Allocation | (161) | - | - | - |
| San Bruno Penalty Capital Revenue Requirement Allocation | 5 | (47) | (93) | (93) |
| Other Expense Adjustments | (3) | (2) | (2) | (1) |
| Adjusted Ex Parte Penalty | (72) | - | - | - |
| **Final Phase Two Revenue Requirement** | **$815** | **$1,061** | **$1,125** | **$1,230** |

51

The phase one decision excluded from rate base $696 million of capital spending in 2011 through 2014 in excess of the amount adopted. The decision permanently disallowed $120 million of that amount and ordered that the remaining $576 million be subject to a third party audit overseen by the CPUC staff, with the possibility that the Utility may seek recovery in a future proceeding. The decision also established various cost caps that will increase the risk of overspend over the current rate case cycle including new one-way capital balancing accounts. Additional charges may be required in the future based on the Utility’s ability to manage its capital spending and on the outcome of the CPUC’s audit of 2011through 2014 capital spending.

On August 1, 2016, TURN, ORA, and Indicated Shippers filed an application for rehearing of the phase one decision. The application indicated that the decision contains language suggesting that the authorized revenue requirement is to comply with new federal and state safety mandates and should be removed from the final decision, allows recovery of shareholder costs in rates, and improperly sequences the calculation of the San Bruno Penalty and the ex parte disallowance. The Utility filed a response on August 16, 2016. The Utility cannot predict when or if the CPUC will grant the rehearing or if it will adopt the parties’ recommendations.

The final phase two decision adopted total weighted average rate base of $2.8 billion in 2015, $2.8 billion in 2016, $3.0 billion in 2017, and $3.5 billion in 2018. The final phase two decision reduced rate base by the full amount of the disallowed capital expenditures but did not remove the associated deferred taxes, which the Utility believes constitutes a normalization violation. In the final decision, the CPUC authorized the Utility to establish a Tax Normalization Memorandum Account to track relevant costs and clarified that it is the CPUC’s intention that the Utility comply with normalization rules and avoid the potential adverse consequences of a normalization violation. The CPUC allowed the Utility to seek a ruling from the IRS and the Utility filed the ruling request with the IRS on April 10, 2017.

On January 4, 2017, TURN, ORA and Indicated Shippers filed an application for rehearing of the phase two decision. Specifically, the application argued that the decision inappropriately sequenced the San Bruno Penalty and the ex parte ratemaking disallowance. The Utility filed a response on January 19, 2017. The Utility cannot predict when or if the CPUC will grant the rehearing. With the addition of a third attrition year, the Utility’s next GT&S cycle will begin in 2019. The decision requires the Utility to file its next GT&S application in 2017.

### Transmission Owner Rate Case

On July 29, 2016, the Utility filed a rate case (the “TO18 rate case”) at the FERC requesting a 2017 retail electric transmission revenue requirement of $1.718 billion, a $387 million increase over the 2016 revenue requirement of $1.331 billion. The forecasted network transmission rate base for 2017 is $6.7 billion. The Utility is also seeking a return on equity of 10.9%, which includes an incentive component of 50 basis points for the Utility’s continuing participation in the CAISO. In the filing, the Utility forecasted that it will make investments of $1.296 billion in 2017 in various capital projects.

On September 30, 2016, the FERC issued an order accepting the Utility’s July 2016 filing and set it for hearing, but held the hearing procedures in abeyance for settlement procedures. The order set an effective date for rates of March 1, 2017, and made the rates subject to refund following resolution of the case. On March 17, 2017, the FERC chief judge issued an order terminating the settlement procedures due to an impasse in the settlement negotiations reported by the parties. Hearings are scheduled to take place starting January 9, 2018 with an initial decision expected on or before June 1, 2018. The Utility is unable to predict whether the parties will be able to re-engage in settlement negotiations.

On March 31, 2017, several of the parties that had already intervened in the TO18 rate case filed a complaint at the FERC, and requested that the complaint be consolidated with the rate case. The complaint asserts that the Utility’s revenue requirement request in TO18 is unreasonably high and should be reduced. As a result, the complaint asks that, if the outcome of the litigation in TO18 is that the Utility’s revenue requirement should be set at a lower level than the settled revenue requirement from the TO17 settlement, that the FERC order refunds to that lower level determined in litigation. On April 20, 2017, the Utility answered the complaint, requesting that FERC dismiss it. The current number of commissioners at the FERC does not meet the FERC quorum requirements. As a result, until such quorum is reached, the Utility does not expect any action to be taken on the complaint.

The Utility expects to file a rate case at the FERC to request a 2018 retail electric transmission revenue requirement in July 2017.

### Cost of Capital

On February 6, 2017, the Utility, along with Southern California Edison Company, San Diego Gas & Electric Company, and Southern California Gas Company (collectively, the “IOUs”) entered into a MOU with the ORA and TURN to extend the next cost of capital application filing deadline two years to April 22, 2019 for the year 2020. To implement the MOU, on February 7, 2016, the IOUs, ORA, and TURN filed with the CPUC a petition for modification of prior CPUC decisions addressing the cost of capital. If the petition for modification is approved as submitted it would reduce the Utility’s ROE from 10.40% to 10.25% and reset the Utility’s authorized cost of long-term debt and preferred stock beginning January 1, 2018. The long-term debt cost reset will reflect actual embedded costs as of the end of August 2017 and forecasted interest rates for the new long-term debt scheduled to be issued for the remainder of 2017 and all of 2018. The Utility’s current capital structure of 52% common equity, 47% long-term debt, and 1% preferred equity would remain unchanged.

If and once the petition for modification is granted by the CPUC, each IOU will submit to the CPUC in September 2017 its respective updated cost of capital and corresponding revenue requirement impacts with an effective date of January 1, 2018. While the actual changes to the Utility’s revenue requirement resulting from the petition for modification will not be known until the Utility’s filing in September 2017, the Utility estimates that its annual revenue requirement will be reduced by approximately $100 million, beginning in 2018. These estimates are based on current and forecasted market interest rates. Changes in market interest rates can have material effects on the cost of the Utility’s future financings and consequently on the estimated change in annual revenue requirements. The Utility’s cost of capital adjustment mechanism would not operate in 2017 but could operate in 2018 to change the cost of capital for 2019. If the mechanism is activated for 2019, the Utility’s cost of capital, including its new ROE of 10.25%, will be adjusted according to the existing terms of the mechanism.

On April 14, 2017, the CPUC issued a PD granting the petition for modification and placed the PD on its April 27, 2017 business meeting agenda. On April 24, 2017, the CPUC held a closed-door ratesetting deliberative meeting and subsequently removed the cost of capital item from the April 27, 2017 business meeting agenda. The CPUC is expected to issue a new PD and may vote to approve a new or alternate PD on the petition for modification at a later business meeting. If the CPUC does not approve the petition for modification as filed, the Utility may be required to file its test year 2018 cost of capital application no later than 60 days after the CPUC decision is issued. The Utility cannot predict when or how the CPUC will act on the petition for modification.

### Diablo Canyon Nuclear Power Plant

#### Joint Proposal for Plant Retirement

On August 11, 2016, the Utility submitted an application to the CPUC to retire Diablo Canyon at the expiration of its current operating licenses in 2024 and 2025 and replace it with a portfolio of energy efficiency and GHG-free resources. The application implements a joint proposal between the Utility and the Friends of the Earth, Natural Resources Defense Council, Environment California, International Brotherhood of Electrical Workers Local 1245, Coalition of California Utility Employees, and Alliance for Nuclear Responsibility.

The parties to the joint proposal proposed that the Utility be authorized to procure GHG-free replacement resources in three competitive procurement tranches. On February 27, 2017, the Utility announced it would withdraw Tranches 2 and 3 and the associated Clean California Charge from the proceeding. The Utility maintained the Tranche 1 energy efficiency replacement proposal. In withdrawing Tranches 2 and 3, the Utility requested that the output of Diablo Canyon be replaced with GHG-free resources, and that the responsibility for, definition of, and cost of these resources be addressed as part of the Utility’s Integrated Resource Plan proceeding. Additionally, the Utility will seek a 55% RPS by 2031 through the Integrated Resource Plan proceeding. Costs associated with energy efficiency projects or programs in Tranche 1 would be recovered through the Utility’s electric public purpose program rates as a non-bypassable charge, consistent with the existing recovery mechanisms for energy efficiency program costs.

More than 40 parties have submitted responses and protests to the Utility’s application. Rebuttal testimony and comments on the community impact mitigation program settlement agreement were submitted to the CPUC on March 17, 2017 and evidentiary hearings took place in April 2017. Some intervenors argued that a portion of or the entire community impact mitigation program and employee retention plan be funded by shareholders and that the CPUC should deny recovery of all license renewal costs. Opening and reply briefs are due on May 26, 2017 and June 16, 2017, respectively. The Utility expects that a final decision will be issued by the end of 2017. Upon CPUC approval of the application and such approval becoming final and non-appealable, the Utility will withdraw its license renewal application currently pending before the NRC. PG&E Corporation and the Utility are unable to predict whether the CPUC will approve the application.

#### California State Lands Commission Lands Lease

On June 28, 2016, California State Lands Commission approved a new lands lease for the intake and discharge structures at Diablo Canyon to run concurrently with Diablo Canyon’s current operating licenses, until Diablo Canyon Unit 2 ceases operations in August 2025. The Utility believes that the approval of the new lease will ensure sufficient time for the Utility to identify and bring online a portfolio of GHG-free replacement resources. The Utility will submit a future lease extension request to address the period of time required for plant decommissioning, which under NRC regulations can take as long as 60 years. On August 28, 2016, the World Business Academy (WBA) filed a writ in the Los Angeles Superior Court. WBA asserts that the State Lands Commission committed legal error when it determined that the short term lease extension for an existing facility was exempt from review under the California Environmental Quality Act. If the petitioner prevails in its challenge, the State Lands Commission could be required to perform an environmental review of the new lands lease. The court has set a trial date of July 11, 2017. The petitioner’s opening brief was filed on February 27, 2017, opposition briefs were submitted on April 24, 2017, and reply briefs are due May 22, 2017.

#### Asset Retirement Obligations

The Utility expects that the decommissioning of Diablo Canyon will take many years after the expiration of its current operating licenses. Detailed studies of the cost to decommission the Utility’s nuclear generation facilities are conducted every three years in conjunction with the NDCTP. Actual decommissioning costs may vary from these estimates as a result of changes in assumptions such as decommissioning dates; regulatory requirements; technology; and costs of labor, materials, and equipment. The Utility recovers its revenue requirements for decommissioning costs from customers through a non-bypassable charge that the Utility expects will continue until those costs are fully recovered.

On March 1, 2016, the Utility submitted its updated decommissioning cost estimate with the CPUC. The estimated undiscounted cost to decommission the Utility’s nuclear power plants increased by approximately $1.4 billion, for a total estimated cost of $4.8 billion, due to increased estimated costs related to spent fuel storage, staffing, and out-of-state waste disposal. The Utility requested that the CPUC authorize the collection of increased annual revenue requirements beginning on January 1, 2017 based on these updated cost estimates.

On April 20, 2017, the assigned ALJ issued a PD in the Utility’s 2015 NDCTP which proposes to adopt a nuclear decommissioning cost estimate of $1.055 billion for Humboldt Bay, corresponding to the Utility’s request, and $2.421 billion for Diablo Canyon, compared to the Utility’s request of $3.8 billion, or 60 percent of its request. On an aggregate basis, the PD proposes to adopt a $3.5 billion total nuclear decommissioning cost estimate, compared to $4.8 billion requested by the Utility. Compared to the Utility’s estimated cost to decommission Diablo Canyon, the PD proposes decreases to large component removal, site security, decommissioning contractor staff, spent nuclear fuel storage, and waste disposal. If the CPUC adopts the PD, as a result of such reduction in the nuclear decommissioning cost estimate, contributions would not be made in the Diablo Canyon trust fund for the next three years, until 2020. Comments on the PD are due on May 10, 2017. The Utility expects a final decision in the second quarter of 2017.

The estimated nuclear decommissioning cost is discounted for GAAP purposes and recognized as an ARO on the Condensed Consolidated Balance Sheets. The total nuclear decommissioning obligation accrued in accordance with GAAP was $3.5 billion at March 31, 2017, and $3.5 billion at December 31, 2016. These estimates are based on decommissioning cost studies, prepared in accordance with the CPUC requirements. Changes in these estimates could materially affect the amount of the recorded ARO for these assets.

As of March 31, 2017, the nuclear decommissioning trust accounts’ total fair value was $3.1 billion. Changes in the estimated costs, the timing of decommissioning or the assumptions underlying these estimates could cause material revisions to the estimated total cost to decommission.

The Utility expects to file its 2018 NDCTP application in late 2018 or early 2019.

For additional information, see the 2016 Form 10-K.

### CPUC Investigation of the Utility’s Safety Culture

On August 27, 2015, the CPUC began a formal investigation into whether the organizational culture and governance of PG&E Corporation and the Utility prioritize safety and adequately direct resources to promote accountability and achieve safety goals and standards. The CPUC directed the SED to evaluate the Utility’s and PG&E Corporation’s organizational culture, governance, policies, practices, and accountability metrics in relation to the Utility’s record of operations, including its record of safety incidents. The CPUC authorized the SED to engage a consultant to assist in the SED’s investigation and the preparation of a report containing the SED’s assessment. The consultant’s work began in the second quarter of 2016 and was largely completed in the first quarter of 2017.

The CPUC stated that the initial phase of the proceeding was categorized as rate setting because it will consider issues both of fact and policy and because the Utility and PG&E Corporation do not face the prospect of fines, penalties, or remedies in this phase. The assigned commissioner will determine the scope of any next actions in the proceeding. The timing, scope and potential outcome of the investigation are uncertain.

### LEGISLATIVE AND REGULATORY INITIATIVES

The California Legislature and the CPUC have adopted requirements, policies, and decisions to improve and refine gas and electric safety citation programs, implement new state law requirements applicable to natural gas storage facilities, accommodate the growth in distributed electric generation resources (including solar installations), increase the amount of renewable energy delivered to customers, promote customer energy efficiency and demand response programs, and foster the development of a state-wide electric vehicle charging infrastructure to encourage the use of electric vehicles. In addition, the CPUC continues to implement state law requirements to reform electric rates to more closely reflect the utilities’ actual costs of service, reduce cross-subsidization among customer rate classes, implement new rules for net energy metering (which currently allow certain self-generating customers to receive bill credits for surplus power at the full retail rate), and allow customers to have greater control over their energy use. Significant developments that have occurred since the 2016 Form 10-K was filed with the SEC are discussed below.

The Utility’s ability to recover its costs, including investments associated with legislative and regulatory initiatives, as well as its electricity procurement and other operating costs, will, in large part, depend on the final form of legislative or regulatory requirements, and whether the associated ratemaking mechanisms can be timely adjusted to reflect changes in customer demand for the Utility’s electricity and natural gas service.

#### Gas and Electric Safety Citation Program

The SED periodically audits utility operating practices and conducts investigations of potential violations of laws and regulations applicable to the safety of the California utilities’ electric and natural gas facilities and operations. The CPUC has delegated authority to the SED to issue citations and impose penalties for violations identified through audits, investigations, or self-reports. Under both the gas and electric programs, the SED has discretion whether to issue a penalty for each violation, but if it assesses a penalty for a violation, it is required to impose the maximum statutory penalty of $50,000. The SED may, at its discretion, impose penalties on a daily basis, or on less than a daily basis, for violations that continued for more than one day.

On September 29, 2016, the CPUC issued a final decision adopting improvements and refinements to its gas and electric safety citation programs. Specifically, the final decision refines the criteria for the SED to use in determining whether to issue a citation and the amount of penalty, sets an administrative limit of $8 million per citation issued, makes self-reporting voluntary in both gas and electric programs, adopts detailed criteria for the utilities to use to voluntarily self-report a potential violation, and refines other issues in the programs. The decision also merges the rules applicable to its gas and electric safety citation programs into a single set of rules that replace the previous safety citation programs and adopts non-substantive changes to these programs so that the programs can be similar in structure and process where appropriate.

On February 21, 2017, California State Senator Jerry Hill filed a petition for modification of the CPUC’s September 29, 2016 decision regarding the safety citation program. The petition for modification requests that the decision be modified to reinstate mandatory self-reporting for gas safety potential violations and require gas utilities to notify local governments within 30 days when a self-report is submitted to SED. Under the request, electric utilities would keep the voluntary self-reporting regime and would not be required to notify local governments, but the CPUC has discretion to direct notification within ten days on a case-by-case basis. The CPUC’s Office of Safety Advocates filed a response suggesting additional potential modification to the gas and electric safety citation programs. The Utility cannot predict when or how the CPUC will act on the petition of modification.

#### Bulk Electric System Reliability Standard Violations

The FERC has certified the NERC as the Electric Reliability Organization with the authority to establish and enforce reliability standards for the bulk electric system, subject to the FERC review. The NERC has delegated authority to the WECC as the Regional Entity for the Western Interconnection to monitor compliance with reliability standards, assure mitigation of violations, and assess penalties, subject to the NERC and the FERC review. The NERC’s reliability standards govern all aspects of the operation of the grid that impact reliability, including protection of critical assets, cybersecurity, communications, emergency preparedness, vegetation management, transmission planning, transmission operation, facilities design and rating.

The WECC, NERC, and FERC periodically audit electric utilities for compliance with the reliability standards, and may also conduct spot checks and investigate potential compliance violations. The WECC, NERC, and FERC have the authority to impose monetary and non-monetary sanctions for violations of reliability standards, including monetary penalties up to $1 million per day per violation. The amount of a penalty depends upon the risk posed by the violation of a particular standard, the severity of the particular violation, and the duration of the violation. Entities found in violation of a standard must also submit a mitigation plan for approval by the WECC, NERC, and FERC. Entities generally discuss with the WECC the sanctions for an alleged violation and may mutually agree on a reduction in a proposed penalty depending upon mitigating factors and mitigation plans.

The Utility has submitted several self-reports to the WECC that are pending the WECC’s review. The Utility believes it is probable that the WECC, NERC, or FERC will impose penalties or take other enforcement action regarding some of these violations. The Utility cannot reasonably estimate the amount or range of future charges that could be incurred for fines imposed by these agencies regarding these matters given the wide discretion those agencies have in determining whether to bring enforcement action and the number of factors that can be considered in determining the amount of fines. Previously, final monetary penalties that were imposed on the Utility for alleged violations of reliability standards have ranged from less than a few thousand dollars to $1.2 million.

#### Natural Gas Storage Regulations

On January 6, 2016, the California Governor ordered the DOGGR to issue emergency regulations to require gas storage facility operators throughout California, including the Utility, to comply with new safety and reliability measures. On February 5, 2016, the DOGGR adopted the emergency regulations. The Utility implemented the regulations and submitted an Underground Storage Risk and Integrity Management Plan on August 5, 2016 that is pending DOGGR approval.

Additionally, in September 2016, the California Governor signed SB 887 directing DOGGR and CARB to develop permanent regulations for gas storage facility operations in California, which are expected to be finalized in the second half of 2017. The PHMSA has also issued interim final rules effective January 18, 2017 regulating gas storage facilities at the federal level. PHMSA’s regulations are subject to a challenge in federal courts related to the implementation timeframe and the practices that have become mandatory under these new regulations. PG&E Corporation and the Utility are unable to predict the outcome of that challenge.

The Utility may incur significant costs to comply with the new regulations related to (1) the development of a natural gas leak prevention and response program, (2) the development of a plan for corrosion monitoring and evaluation, (3) proactive replacement of equipment at risk of failure, and (4) a review of risk management plans to consider various risk factors. On March 20, 2017, the Utility submitted an advice letter with the CPUC to request a memorandum account to track the future incremental costs associated with implementing the new regulations. Upon approval, a subsequent application would be submitted to the CPUC for recovery of the incremental costs being tracked. The Utility is unable to estimate the timing and outcome of such requests.

#### Electric Distribution Resources Plan

As required by California law, on July 1, 2015, the Utility filed its proposed electric distribution resources plan for approval by the CPUC. The Utility’s plan identifies optimal locations on its electric distribution system for deployment of DERs. The Utility’s proposal is designed to allow energy technologies to be interconnected with each other and integrated into the larger grid while continuing to provide customers with safe, reliable and affordable electric service.

On January 24, 2017, the CPUC convened a workshop aimed at informing the development of a CPUC framework to evaluate grid-modernization investments. The workshop was attended by the California IOUs, the DER industry, consumer advocates, the DOE, and the CPUC’s Energy Division staff. The Energy Division staff is expected to develop a grid modernization investment framework in the second quarter of 2017.

On February 27, 2017, the CPUC issued a ruling that seeks the development of a process for incorporating DER forecasts into the distribution resources plan and takes into consideration the coordination with other statewide planning and forecasting processes, such as the CPUC’s Integrated Resource Plan process, the CEC’s Integrated Energy Policy Report, and the CAISO’s Transmission Planning Process. This ruling mandates the Utility, along with Southern California Edison and San Diego Gas and Electric to develop a draft joint proposal for the CPUC and stakeholder consideration on the process for developing DER forecasts that is coordinated with the various statewide planning and forecasting processes. The Utility is unable to predict when a final CPUC decision approving, disapproving, or modifying the Utility’s electric distribution resources plan will be issued.

#### Transportation Electrification (TE) Application

California Law (SB 350) requires the CPUC, in consultation with the CARB and the CEC, to direct the Utility and electrical corporations to file applications for programs and investments to accelerate widespread TE. In September 2016, the CPUC directed the Utility and the other large IOUs to file TE applications which include both short-term projects (of up to $20 million in total) and two to five-year programs with a requested revenue requirement determined by the Utility. On January 20, 2017, the Utility filed its TE application with the CPUC requesting a total of up to $253 million (approximately $211 million in capital expenditures) in program funding over five years (2018 - 2022) primarily related to make-ready infrastructure for TE in medium to heavy-duty vehicle sectors. The Utility expects a decision to be issued within 12 to 18 months from the application.

#### CPUC General Order 112-F

In June 2015, the CPUC issued a decision that imposed new operation and maintenance standards for natural gas systems. The new standards became effective January 1, 2017. The new standards require additional expenditures in the areas of gas leak repair, leak survey, high consequences area identification, and operator qualifications, and could impact the Utility’s ability to timely recover certain costs. The Utility expects to incur over $50 million in costs to implement the new standards in 2017 and 2018, cumulatively. On January 31, 2017, the Utility filed a petition for modification of the CPUC decision imposing the new requirements to allow the Utility to establish a memorandum account to record for possible future recovery the cost to implement the new requirements concerning the Utility’s natural gas transmission operations in 2017 and 2018. (In June 2016, the CPUC modified the GT&S rate case cycle, making the effective date for rates for the next GT&S rate case January 1, 2019, rather than 2018, as a result of which, in absence of the requested memorandum account, the Utility would not be able to recover costs incurred prior to 2019.) The Utility is unable to predict the outcome of this proceeding.

#### Portfolio Allocation Methodology Filing

On April 25, 2017, the Utility, along with Southern California Edison Company and San Diego Gas & Electric Company, filed a joint application with the CPUC on how to allocate costs associated with long-term power contracts in a manner that ensures all customers are treated equally. At issue is how communities that choose to implement CCA power arrangements and direct access customers pay for their share of the contract costs. Currently, they are not paying their full share of costs associated with the long-term contracts, which results in other customers paying more, which is inconsistent with state law. The proposed approach would replace the current system, which is known as the Power Charge Indifference Adjustment (PCIA), with an updated system known as the Portfolio Allocation Methodology (PAM). The new PAM proposal would do the following: (1) prepare for additional CCAs in the future by allocating resource adequacy and renewable energy credits to the CCAs to start or enhance their portfolios, (2) improve upon the current system by eliminating cost estimates, replacing it with actual costs of energy resources, (3) enable true-up forecasts so customer costs reflect actual energy prices, (4) ensure that low-income customers are treated fairly and aren’t disproportionately impacted by the evolving energy landscape over the next decade or longer, and (5) protect customers who choose to remain with their energy company from paying much more than their fair share.

The Utility proposes that the PAM take effect no sooner than one year from CPUC approval of this application and that it be implemented through its Energy Resource Recovery Account Forecast proceeding. The procedural schedule proposed by the Utility calls for a CPUC decision by the end of 2017.

### ENVIRONMENTAL MATTERS

The Utility’s operations are subject to extensive federal, state, and local laws and permits relating to the protection of the environment and the safety and health of the Utility’s personnel and the public. These laws and requirements relate to a broad range of the Utility’s activities, including the remediation of hazardous wastes; the reporting and reduction of CO2 and other GHG emissions; the discharge of pollutants into the air, water, and soil; the reporting of safety and reliability measures for natural gas storage facilities; and the transportation, handling, storage, and disposal of spent nuclear fuel. (See Note 9 of the Notes to the Condensed Consolidated Financial Statements, as well as “Item 1A. Risk Factors” and Note 13 of the Notes to the Consolidated Financial Statements in the 2016 Form 10-K.)

### CONTRACTUAL COMMITMENTS

PG&E Corporation and the Utility enter into contractual commitments in connection with future obligations that relate to purchases of electricity and natural gas for customers, purchases of transportation capacity, purchases of renewable energy, and purchases of fuel and transportation to support the Utility’s generation activities. (See “Purchase Commitments” in Note 9 of the Notes to the Condensed Consolidated Financial Statements). Contractual commitments that relate to financing arrangements include long-term debt, preferred stock, and certain forms of regulatory financing. For more in-depth discussion about PG&E Corporation’s and the Utility’s contractual commitments, see “Liquidity and Financial Resources” above and Management’s Discussion and Analysis of Financial Condition and Results of Operations – Contractual Commitments in the 2016 Form 10-K.

### Off-Balance Sheet Arrangements

PG&E Corporation and the Utility do not have any off-balance sheet arrangements that have had, or are reasonably likely to have, a current or future material effect on their financial condition, changes in financial condition, revenues or expenses, results of operations, liquidity, capital expenditures, or capital resources, other than those discussed in Note 13 of the Notes to the Consolidated Financial Statements in the 2016 Form 10-K (the Utility’s commodity purchase agreements).

### RISK MANAGEMENT ACTIVITIES

PG&E Corporation, mainly through its ownership of the Utility, and the Utility are exposed to market risk, which is the risk that changes in market conditions will adversely affect net income or cash flows. PG&E Corporation and the Utility face market risk associated with their operations; their financing arrangements; the marketplace for electricity, natural gas, electric transmission, natural gas transportation, and storage, emissions allowances and offset credits, other goods and services, and other aspects of their businesses. PG&E Corporation and the Utility categorize market risks as “commodity price risk” and “interest rate risk.” The Utility is also exposed to “credit risk,” the risk that counterparties fail to perform their contractual obligations.

The Utility actively manages market risk through risk management programs designed to support business objectives, discourage unauthorized risk-taking, reduce commodity cost volatility, and manage cash flows. The Utility uses derivative instruments only for risk mitigation purposes and not for speculative purposes. The Utility’s risk management activities include the use of physical and financial instruments such as forward contracts, futures, swaps, options, and other instruments and agreements, most of which are accounted for as derivative instruments. Some contracts are accounted for as leases. The Utility manages credit risk associated with its counterparties by assigning credit limits based on evaluations of their financial conditions, net worth, credit ratings, and other credit criteria as deemed appropriate. Credit limits and credit quality are monitored periodically. These activities are discussed in detail in the 2016 Form 10-K. There were no significant developments to the Utility’s and PG&E Corporation’s risk management activities during the three months ended March 31, 2017.

### CRITICAL ACCOUNTING POLICIES

The preparation of the Condensed Consolidated Financial Statements in accordance with GAAP involves the use of estimates and assumptions that affect the recorded amounts of assets and liabilities as of the date of the Condensed Consolidated Financial Statements and the reported amounts of revenues and expenses during the reporting period. PG&E Corporation and the Utility consider their accounting policies for regulatory assets and liabilities, loss contingencies associated with environmental remediation liabilities and legal and regulatory matters, accounting policies for insurance recoveries, AROs, and pension and other postretirement benefits plans to be critical accounting policies. These policies are considered critical accounting policies due, in part, to their complexity and because their application is relevant and material to the financial position and results of operations of PG&E Corporation and the Utility, and because these policies require the use of material judgments and estimates. Actual results may differ materially from these estimates. These accounting policies and their key characteristics are discussed in detail in the 2016 Form 10-K.

### ACCOUNTING STANDARDS ISSUED BUT NOT YET ADOPTED

See the discussion above in Note 2 of the Notes to the Condensed Consolidated Financial Statements.

### FORWARD-LOOKING STATEMENTS

This report contains forward-looking statements that are necessarily subject to various risks and uncertainties. These statements reflect management’s judgment and opinions which are based on current estimates, expectations, and projections about future events and assumptions regarding these events and management's knowledge of facts as of the date of this report. These forward-looking statements relate to, among other matters, estimated losses, including penalties and fines, associated with various investigations and proceedings; forecasts of pipeline-related expenses that the Utility will not recover through rates; forecasts of capital expenditures; estimates and assumptions used in critical accounting policies, including those relating to regulatory assets and liabilities, environmental remediation, litigation, third-party claims, and other liabilities; and the level of future equity or debt issuances. These statements are also identified by words such as “assume,” “expect,” “intend,” “forecast,” “plan,” “project,” “believe,” “estimate,” “predict,” “anticipate,” “may,” “should,” “would,” “could,” “potential” and similar expressions. PG&E Corporation and the Utility are not able to predict all the factors that may affect future results. Some of the factors that could cause future results to differ materially from those expressed or implied by the forward-looking statements, or from historical results, include, but are not limited to:

the timing and outcomes of the 2017 GRC, TO rate case, cost of capital proceeding, and other ratemaking and regulatory proceedings;

the timing and outcome of the Butte fire litigation, including any claims that may be submitted or lawsuits that may be commenced in the future, and whether the Utility’s insurance is sufficient to cover the Utility’s liability resulting therefrom or whether insurance is otherwise available; the effect, if any, that the SED’s $8.3 million citations issued in connection with the Butte fire may have on such litigation; and whether additional investigations and proceedings in connection with the Butte fire will be opened and any additional fines or penalties imposed on the Utility;

the outcome of the probation and the monitorship imposed as a result of the Utility’s conviction in the federal criminal trial, the timing and outcomes of the debarment proceeding, the SED’s unresolved enforcement matters relating to the Utility’s compliance with natural gas-related laws and regulations, and other investigations that have been or may be commenced relating to the Utility’s compliance with natural gas- and electric- related laws and regulations, and the ultimate amount of fines, penalties, and remedial costs that the Utility may incur in connection with the outcomes;

the timing and outcomes of the U.S. Attorney’s Office in San Francisco and the California Attorney General’s office investigations in connection with communications between the Utility’s personnel and CPUC officials, whether additional criminal or regulatory investigations or enforcement actions are commenced with respect to allegedly improper communications, and the extent to which such matters negatively affect the final decisions to be issued in the Utility’s ratemaking proceedings, and the timing and outcome of the federal investigation regarding possible criminal violations of the Migratory Bird Treaty Act and conspiracy to violate the act;

whether PG&E Corporation and the Utility are able to repair the harm to their reputations caused by the Utility’s conviction in the federal criminal trial, the state and federal investigations of natural gas incidents, matters relating to the criminal federal trial, improper communications between the CPUC and the Utility, and the Utility’s ongoing work to remove encroachments from transmission pipeline rights-of-way;

whether the Utility can control its costs within the authorized levels of spending, and successfully implement a streamlined organizational structure and achieve project savings, the extent to which the Utility incurs unrecoverable costs that are higher than the forecasts of such costs, and changes in cost forecasts or the scope and timing of planned work resulting from changes in customer demand for electricity and natural gas or other reasons;

the timing and outcome of the complaint filed by the CPUC and certain other parties with the FERC on February 2, 2017 that requests that the Utility provide an open and transparent planning process for its capital transmission projects that do not go through the CAISO’s Transmission Planning Process in order to allow for participation and input from interested parties. The planning process that may result from the proceeding may impact the scope and timing of capital transmission projects that the Utility will execute in the future;

the amount and timing of additional common stock and debt issuances by PG&E Corporation, including the dilutive impact of common stock issuances to fund PG&E Corporation’s equity contributions to the Utility as the Utility incurs charges and costs, including fines, that it cannot recover through rates;

the outcome of the CPUC’s investigation into the Utility’s safety culture, and future legislative or regulatory actions that may be taken to require the Utility to separate its electric and natural gas businesses, restructure into separate entities, undertake some other corporate restructuring, or implement corporate governance changes;

the outcome of current and future self-reports, investigations or other enforcement proceedings that could be commenced or notices of violation that could be issued relating to the Utility’s compliance with laws, rules, regulations, or orders applicable to its operations, including the construction, expansion or replacement of its electric and gas facilities, electric grid reliability, inspection and maintenance practices, customer billing and privacy, physical and cyber security, and environmental laws and regulations;

the impact of environmental remediation laws, regulations, and orders; the ultimate amount of costs incurred to discharge the Utility’s known and unknown remediation obligations; and the extent to which the Utility is able to recover environmental costs in rates or from other sources;

the ultimate amount of unrecoverable environmental costs the Utility incurs associated with the Utility’s natural gas compressor station site located near Hinkley, California;

the impact of the increasing cost of natural gas regulations, including the SB 887 directing DOGGR and CARB to develop permanent regulations for gas storage facility operations in California to comply with new safety and reliability measures, the PHSMA rules effective January 18, 2017 regulating gas storage facilities at the federal level; and the CPUC General Order 112-F that went into effect on January 1, 2017 and that requires additional expenditures in the areas of gas leak repair, leak survey, high consequences area identification, and operator qualifications, and could impact the Utility’s ability to timely recover such costs;

the impact of new legislation or NRC regulations, recommendations, policies, decisions, or orders relating to the nuclear industry, including operations, seismic design, security, safety, relicensing, the storage of spent nuclear fuel, decommissioning, cooling water intake, or other issues; the impact of actions taken by state agencies that may affect the Utility’s ability to continue operating Diablo Canyon; whether the CPUC approves the joint proposal that will phase out the Utility’s Diablo Canyon nuclear units at the expiration of their licenses in 2024 and 2025; whether the Utility obtains the approvals required to withdraw its NRC application to renew the two Diablo Canyon operating licenses; whether the State Lands Commission could be required to perform an environmental review of the new lands lease as a result of the WBA assertion that the State Lands Commission committed legal error when it determined that the short term lease extension for an existing facility was exempt from review under the California Environmental Quality Act; and whether the Utility will be able to successfully implement its retention and retraining and development programs for Diablo Canyon employees, and whether these programs will be recovered in rates;

whether the Utility is successful in ensuring physical security of its critical assets and whether the Utility’s information technology, operating systems and networks, including the advanced metering system infrastructure, customer billing, financial, records management, and other systems, can continue to function accurately while meeting regulatory requirements; whether the Utility and its third party vendors and contractors (who host, maintain, modify and update some of the Utility’s systems) are able to protect the Utility’s operating systems and networks from damage, disruption, or failure caused by cyber-attacks, computer viruses, or other internal or external hazards; whether the Utility’s security measures are sufficient to protect against unauthorized or inadvertent disclosure of information contained in such systems and networks, including confidential proprietary information and the personal information of customers; and whether the Utility can continue to rely on third-party vendors and contractors that maintain and support some of the Utility’s information technology and operating systems;

the impact of droughts, floods, or other weather-related conditions or events, wildfires (such as the Butte fire), climate change, natural disasters, acts of terrorism, war, vandalism (including cyber-attacks), downed power lines, and other events, that can cause unplanned outages, reduce generating output, disrupt the Utility’s service to customers, or damage or disrupt the facilities, operations, or information technology and systems owned by the Utility, its customers, or third parties on which the Utility relies, and of the potential inadequacy of the Utility’s emergency preparedness; whether the Utility incurs liability to third parties for property damage or personal injury caused by such events; whether the Utility is subject to civil, criminal, or regulatory penalties in connection with such events; and whether the Utility’s insurance coverage is available for these types of claims and sufficient to cover the Utility’s liability;

the breakdown or failure of equipment that can cause fires and unplanned outages (such as the power outage on April 21, 2017 in San Francisco, that initial information suggests was due to an equipment failure that led to a fire at Larkin Street substation, and that impacted approximately 88,000 customers); and whether the Utility will be subject to investigations, penalties, and other costs in connection with such events;

how the CPUC and the CARB implement state environmental laws relating to GHG, renewable energy targets, energy efficiency standards, DERs, electric vehicles, and similar matters, including whether the Utility is able to continue recovering associated compliance costs, such as the cost of emission allowances and offsets under cap-and-trade regulations; and whether the Utility is able to timely recover its associated investment costs;

whether the Utility’s climate change adaptation strategies are successful;

the impact that reductions in customer demand for electricity and natural gas have on the Utility’s ability to make and recover its investments through rates and earn its authorized return on equity, and whether the Utility is successful in addressing the impact of growing distributed and renewable generation resources, changing customer demand for natural gas and electric services, and an increasing number of customers departing for CCAs;

the supply and price of electricity, natural gas, and nuclear fuel; the extent to which the Utility can manage and respond to the volatility of energy commodity prices; the ability of the Utility and its counterparties to post or return collateral in connection with price risk management activities; and whether the Utility is able to recover timely its electric generation and energy commodity costs through rates, including its renewable energy procurement costs;

whether, as a result of Westinghouse’s Chapter 11 proceeding, the Utility will experience issues with nuclear fuel supply, nuclear fuel inventory, and related services and products that Westinghouse supplies, and whether such proceeding will affect the Utility’s contracts with Westinghouse;

the amount and timing of charges reflecting probable liabilities for third-party claims; the extent to which costs incurred in connection with third-party claims or litigation can be recovered through insurance, rates, or from other third parties; and whether the Utility can continue to obtain adequate insurance coverage for future losses or claims, especially following a major event that causes widespread third-party losses;

the ability of PG&E Corporation and the Utility to access capital markets and other sources of debt and equity financing in a timely manner on acceptable terms;

changes in credit ratings which could result in increased borrowing costs especially if PG&E Corporation or the Utility were to lose their investment grade credit ratings;

the impact of federal or state laws or regulations, or their interpretation, on energy policy and the regulation of utilities and their holding companies, including how the CPUC interprets and enforces the financial and other conditions imposed on PG&E Corporation when it became the Utility’s holding company, and whether the ultimate outcomes of the CPUC’s pending investigations, the Utility’s conviction in the federal criminal trial, and other enforcement matters will impact the Utility’s ability to make distributions to PG&E Corporation, and, in turn, PG&E Corporation’s ability to pay dividends;

the impact of the corporate tax reform considered by the new federal administration and the outcome of federal or state tax audits and the impact of any changes in federal or state tax laws, policies, regulations, or their interpretation;

changes in the regulatory and economic environment, including potential changes affecting renewable energy sources and associated tax credits, as a result of the new federal administration; and the impact of changes in GAAP, standards, rules, or policies, including those related to regulatory accounting, and the impact of changes in their interpretation or application.

Additional information about risks and uncertainties, including more detail about the factors described in this report, is included throughout MD&A, in “Item 1A. Risk Factors” below, and in the 2016 Form 10-K, including the “Risk Factors” section. Forward-looking statements speak only as of the date they are made. PG&E Corporation and the Utility do not undertake any obligation to update forward-looking statements, whether in response to new information, future events, or otherwise.

Additionally, PG&E Corporation and the Utility routinely provide links to the Utility’s principal regulatory proceedings before the CPUC and the FERC at *http://investor.pgecorp.com,* under the “Regulatory Filings” tab, so that such filings are available to investors upon filing with the relevant agency. It is possible that these regulatory filings or information included therein could be deemed to be material information. The information contained on this website is not part of this or any other report that PG&E Corporation or the Utility files with, or furnishes to, the SEC. PG&E Corporation and the Utility are providing the address to this website solely for the information of investors and do not intend to address to be an active link.

## Market risk

As filed, 606 characters.

PG&E Corporation’s and the Utility’s primary market risk results from changes in energy commodity prices. PG&E Corporation and the Utility engage in price risk management activities for non-trading purposes only. Both PG&E Corporation and the Utility may engage in these price risk management activities using forward contracts, futures, options, and swaps to hedge the impact of market fluctuations on energy commodity prices and interest rates. (See the section above entitled “Risk Management Activities” in Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations.)

## Controls and procedures

As filed, 1,199 characters.

Based on an evaluation of PG&E Corporation’s and the Utility’s disclosure controls and procedures as of March 31, 2017, PG&E Corporation’s and the Utility’s respective principal executive officers and principal financial officers have concluded that such controls and procedures are effective to ensure that information required to be disclosed by PG&E Corporation and the Utility in reports that the companies file or submit under the Securities Exchange Act of 1934, as amended, is (i) recorded, processed, summarized, and reported within the time periods specified in the SEC rules and forms, and (ii) accumulated and communicated to PG&E Corporation’s and the Utility’s management, including PG&E Corporation’s and the Utility’s respective principal executive officers and principal financial officers, or persons performing similar functions, as appropriate to allow timely decisions regarding required disclosure.

There were no changes in internal control over financial reporting that occurred during the quarter ended March 31, 2017, that have materially affected, or are reasonably likely to materially affect, PG&E Corporation’s or the Utility’s internal control over financial reporting.

## Risk factors

As filed, 4,076 characters.

For information about the significant risks that could affect PG&E Corporation’s and the Utility’s future financial condition, results of operations, and cash flows, see the section of the 2016 Form 10-K entitled “Risk Factors,” as supplemented below, and the section of this quarterly report entitled “Cautionary Language Forward-Looking Statements.”

***The Utility purchases its nuclear fuel assemblies from a sole source, Westinghouse. If Westinghouse experiences business disruptions as a result of Chapter 11 proceedings, the Utility could experience disruptions in nuclear fuel supply, delays in connection with its Diablo Canyon outages and refuelings, and rejection in bankruptcy of its contracts with Westinghouse.***

The Utility purchases its nuclear fuel assemblies for Diablo Canyon from a sole source, Westinghouse. The Utility also stores nuclear fuel inventory at the Westinghouse fuel fabrication facility. In addition, Westinghouse provides the Utility with Diablo Canyon outage support services, nuclear fuel analysis, OEM engineering and parts support. On March 29, 2017, Westinghouse filed for Chapter 11 protection in the United States Bankruptcy Court, Southern District of New York. In the event that Westinghouse experiences business disruptions in its nuclear fuel business as a result of bankruptcy proceedings or otherwise, the Utility could experience issues with its nuclear fuel supply and delays in connection with Diablo Canyon refueling outages. The Utility also could experience losses in connection with its nuclear fuel inventory and Westinghouse could seek to reject in bankruptcy its contracts with the Utility. Diablo Canyon’s Unit 1 refueling outage started in mid-April of 2017 and is expected to continue through early July of 2017. Diablo Canyon’s Unit 2 refueling outage is expected to occur in the first quarter of 2018. If Westinghouse were to reject the Utility’s contracts or fail to deliver nuclear fuel or provide outage support to the Utility, the Utility’s operation of Diablo Canyon would be adversely affected. PG&E Corporation and the Utility also could incur additional costs, including costs to purchase replacement power in the event that one or both Diablo Canyon units are unable to operate. There can be no assurance that any such costs would be recoverable in the rates the Utility is permitted to recover from its customers. Furthermore, the Utility currently is not able to estimate the nature or amount of additional costs and expenses that it might incur in connection with the uncertainties surrounding Westinghouse but such costs and expenses could be material.

***For certain critical technologies, products and services, the Utility relies on a limited number of suppliers and, in some cases, sole suppliers. In the event these suppliers are unable to perform, the Utility could experience delays and disruptions in its business operations while it transitions to alternative plans or suppliers.***

The Utility relies on a limited number of sole source suppliers for certain of its technologies, products and services. Although the Utility has long-term agreements with such suppliers, if the suppliers are unable to deliver these technologies, products or services, the Utility could experience delays and disruptions while it implements alternative plans and makes arrangements with acceptable substitute suppliers. As a result, the Utility’s business, financial condition, and results of operations could be significantly affected. As an example, the Utility relies on Silver Spring Networks, Inc. and Aclara Technologies LLC as suppliers of proprietary SmartMeter™ devices and software, and of managed services, utilized in its advanced metering system that collects electric and natural gas usage data from customers. If these suppliers encounter performance difficulties, are unable to supply these devices or maintain and update their software, or provide other services to maintain these systems, the Utility’s metering, billing, and electric network operations could be impacted and disrupted.

Filed May 2, 2017.
Source: SEC EDGAR, the filing index for accession 0001004980-17-000012. Last ingested by Listed: Nov 14, 2026, 23:58 ET. No prices; not investment advice.