# PG&E Corp: Form 10-Q for the period ended Mar 31, 2018

- Company: [PG&E Corp](/companies/pcg.md) (CIK 1004980)
- Form: 10-Q
- Filed: 2018-05-03
- Accepted by EDGAR: May 3, 2018, 14:50 ET
- Period: 2018-03-31
- Accession: 0001004980-18-000005
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/1004980/000100498018000005/pge-033118x10q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/1004980/000100498018000005/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2018-03-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Operating income | 3 months, 2018-01-01 to 2018-03-31 | $599.0m | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2018-01-01 to 2018-03-31 | $220.0m | us-gaap:InterestExpense |
| Income tax | 3 months, 2018-01-01 to 2018-03-31 | $51.0m | us-gaap:IncomeTaxExpenseBenefit |
| Diluted EPS | 3 months, 2018-01-01 to 2018-03-31 | $0.86 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2018-01-01 to 2018-03-31 | $0.86 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2018-01-01 to 2018-03-31 | 516,000,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months, 2018-01-01 to 2018-03-31 | $1.51bn | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 3 months, 2018-01-01 to 2018-03-31 | $1.47bn | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Dividends paid | 3 months, 2018-01-01 to 2018-03-31 | $0 | us-gaap:PaymentsOfDividendsCommonStock |
| Cash and equivalents | at 2018-03-31 | $144.0m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2018-03-31 | $5.86bn | us-gaap:AssetsCurrent |
| Total assets | at 2018-03-31 | $68.15bn | us-gaap:Assets |
| Current liabilities | at 2018-03-31 | $6.92bn | us-gaap:LiabilitiesCurrent |
| Long-term debt | at 2018-03-31 | $17.41bn | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2018-03-31 | $394.0m | us-gaap:LongTermDebtCurrent |
| Short-term borrowings | at 2018-03-31 | $967.0m | us-gaap:ShortTermBorrowings |
| Shareholders' equity | at 2018-03-31 | $19.73bn | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 109,587 characters.

### OVERVIEW

PG&E Corporation is a holding company whose primary operating subsidiary is Pacific Gas and Electric Company, a public utility serving northern and central California. The Utility generates revenues mainly through the sale and delivery of electricity and natural gas to customers.

The Utility is regulated primarily by the CPUC and the FERC. The CPUC has jurisdiction over the rates, terms, and conditions of service for the Utility’s electricity and natural gas distribution operations, electric generation, and natural gas transportation and storage. The FERC has jurisdiction over the rates and terms and conditions of service governing the Utility’s electric transmission operations and interstate natural gas transportation contracts. The NRC oversees the licensing, construction, operation, and decommissioning of the Utility’s nuclear generation facilities. The Utility is also subject to the jurisdiction of other federal, state, and local governmental agencies.

This is a combined quarterly report of PG&E Corporation and the Utility and should be read in conjunction with each company’s separate Condensed Consolidated Financial Statements and the Notes to the Condensed Consolidated Financial Statements included in this quarterly report. It also should be read in conjunction with the 2017 Form 10-K.

Beginning on October 8, 2017, multiple wildfires spread through Northern California, including Napa, Sonoma, Butte, Humboldt, Mendocino, Del Norte, Lake, Nevada, and Yuba Counties, as well as in the area surrounding Yuba City (the “Northern California wildfires”). According to the Cal Fire California Statewide Fire Summary dated October 30, 2017, at the peak of the wildfires, there were 21 major wildfires in Northern California that, in total, burned over 245,000 acres and destroyed an estimated 8,900 structures. The wildfires also resulted in 44 fatalities.

The Northern California wildfires are under investigation by Cal Fire and the CPUC, including the possible role of the Utility’s power lines and other facilities. The Utility expects that Cal Fire will issue a report or reports stating its conclusions as to the sources of ignition of the fires and the ways that they progressed. Further, the CPUC’s SED is conducting investigations to assess the compliance of electric and communication companies’ facilities with applicable rules and regulations in fire-impacted areas. According to information made available by the CPUC, investigation topics include, but are not limited to, maintenance of facilities, vegetation management, and emergency preparedness and response. It is uncertain when the investigations will be complete and whether Cal Fire will release any preliminary findings before its investigations are complete.

PG&E Corporation and the Utility’s financial condition, results of operations, liquidity and cash flows could be materially affected by potential losses resulting from the impact of the Northern California wildfires. See Item 1A. Risk Factors in the 2017 Form 10-K.

### Tax Cuts and Jobs Act of 2017

On December 22, 2017, the U.S. government enacted expansive tax legislation commonly referred to as the Tax Act. Among other provisions, the Tax Act reduces the federal income tax rate from 35% to 21% beginning on January 1, 2018 and eliminated bonus depreciation for utilities. The Tax Act required PG&E Corporation and the Utility to re-measure all existing deferred income tax assets and liabilities to reflect the reduction in the federal tax rate. PG&E Corporation and the Utility recorded reasonable estimates to reflect the impacts of the Tax Act and recorded provisional amounts, in accordance with rules issued by the SEC in Staff Accounting Bulletin No. 118, for the re-measurement of deferred tax balances as of December 31, 2017. There were no material updates to these estimates in the three months ended March 31, 2018.

On March 30, 2018, the Utility submitted to the CPUC PFMs of the CPUC’s final decisions in the Utility’s 2017 GRC, and the 2015 GT&S rate case. Additionally, the Utility submitted updated testimony in connection with the 2019 GT&S rate case. These submittals reflect the effects of the Tax Act on these rate cases. On an aggregate basis from these submittals, the Utility anticipates an annual reduction to revenue requirements of approximately $325 million starting in 2018, and incremental increases to rate base of approximately $271 million for 2018 (including the impact of the pending private letter ruling advice letter), and $613 million for 2019. The incremental increases to rate base are due primarily to the elimination of bonus depreciation. The Utility also expects to reflect an annual revenue requirement reduction, starting in 2018, of approximately $125 million from other rate cases, including the TO19 rate case. The associated rate base increases are approximately $100 million in 2018 and $200 million in 2019. The Utility is unable to predict the timing and outcome of the CPUC decisions in connection with these submittals.

### Summary of Changes in Net Income and Earnings per Share

The tables below include a summary reconciliation of PG&E Corporation’s consolidated income available for common shareholders and EPS to earnings from operations and EPS based on earnings from operations for three months ended March 31, 2018 as compared to the same period in 2017 and a summary reconciliation of the key drivers of PG&E Corporation’s earnings from operations and EPS based on earnings from operations for the three months ended March 31, 2018 as compared to the same period in 2017. “Earnings from operations” is a non-GAAP financial measure and is calculated as income available for common shareholders less items impacting comparability. “Items impacting comparability” represent items that management does not consider part of the normal course of operations and affect comparability of financial results between periods. PG&E Corporation uses earnings from operations to understand and compare operating results across reporting periods for various purposes including internal budgeting and forecasting, short and long-term operating plans, and employee incentive compensation. PG&E Corporation believes that earnings from operations provide additional insight into the underlying trends of the business allowing for a better comparison against historical results and expectations for future performance. Earnings from operations are not a substitute or alternative for GAAP measures such as income available for common shareholders and may not be comparable to similarly titled measures used by other companies.

*(in millions, except per share amounts)*

|  | Three Months Ended March 31, Earnings 2018 | 2017 | Earnings per Common Share (Diluted) 2018 | 2017 |
| --- | ---: | ---: | ---: | ---: |
| **PG&E Corporation’s Earnings on a GAAP basis** | **$442** | **$576** | **$0.86** | **$1.13** |
| Items Impacting Comparability: (1) |  |  |  |  |
| Northern California wildfire-related costs (2) | 15 | — | 0.03 | — |
| Pipeline-related expenses (3) | 7 | 16 | 0.01 | 0.03 |
| Butte fire-related costs, net of insurance (4) | 4 | 2 | 0.01 | — |
| Legal and regulatory-related expenses | — | 2 | — | — |
| Fines and penalties | — | 36 | — | 0.07 |
| GT&S revenue timing impact | — | (88) | — | (0.17) |
| **PG&E Corporation’s Earnings from Operations (5)** | **$468** | **$544** | **$0.91** | **$1.06** |

All amounts presented in the table above are tax adjusted at PG&E Corporation’s statutory tax rate of 27.98 percent for 2018 and 40.75 percent for 2017, except for certain fines and penalties in 2017.

(1) “Items impacting comparability” represent items that management does not consider part of the normal course of operations and affect comparability of financial results between periods.

(2) The Utility incurred costs of $21 million (before the tax impact of $6 million) during the three months ended March 31, 2018, for legal and other costs associated with the Northern California wildfires.

(3) The Utility incurred costs of $10 million (before the tax impact of $3 million) during the three months ended March 31, 2018 for pipeline-related expenses incurred in connection with the multi-year effort to identify and remove encroachments from transmission pipeline rights-of-way.

(4) The Utility incurred costs, net of insurance, of $5 million (before the tax impact of $1 million) during the three months ended March 31, 2018 associated with the Butte fire. The Utility incurred charges of $12 million (before the tax impact of $3 million) during the three months ended March 31, 2018 for legal costs. These costs were partially offset by $7 million (before the tax impact of $2 million) recorded during the three months ended March 31, 2018, for contractor insurance recoveries.

(5) “Earnings from operations” is a non-GAAP financial measure.

### Reconciliation of Key Drivers of PG&E Corporation’s EPS from Operations (Non-GAAP):

*(in millions, except per share amounts)*

|  | Three Months Ended March 31, Earnings | Earnings per Common Share (Diluted) |
| --- | ---: | ---: |
| **2017 Earnings from Operations (1)** | **$544** | **$1.06** |
| Growth in rate base earnings (2) | 42 | 0.08 |
| Timing of 2017 GRC cost recovery (3) | 18 | 0.03 |
| Tax impact of stock compensation (4) | (44) | (0.08) |
| Timing of nuclear refueling outages | (31) | (0.06) |
| Timing of taxes (5) | (25) | (0.05) |
| Decrease in authorized return on equity (6) | (7) | (0.01) |
| Increase in shares outstanding | — | (0.01) |
| Miscellaneous | (29) | (0.05) |
| **2018 Earnings from Operations (1)** | **$468** | **$0.91** |

(1) See first table above for a reconciliation of EPS on a GAAP basis to EPS from Operations. All amounts presented in the table above are tax adjusted at PG&E Corporation’s statutory tax rate of 27.98 percent for 2018 and 40.75 percent for 2017, except for the tax impact of stock compensation. See Footnote 4 below.

(2) Represents the impact of the increase in rate base authorized in various rate cases, including the 2017 GRC, during the three months ended March 31, 2018, as compared to the same period in 2017. The CPUC issued its final decision in the 2017 GRC proceeding on May 11, 2017, delaying recognition of the 2017 revenue increase until the second quarter of 2017.

(3) Represents revenue for GRC-related capital costs (depreciation and interest) in the first quarter of 2018, with no similar impact in 2017. The CPUC issued its final decision in the 2017 GRC on May 11, 2017, delaying recognition of the 2017 revenue increase until the second quarter of 2017.

(4) Represents the impact of income taxes related to share-based compensation awards under the Long-Term Incentive Plan that vested during the three months ended March 31, 2018, as compared to the same period in 2017.

(5) Represents the timing of taxes reportable in quarterly statements in accordance with Accounting Standards Codification 740, *Income Taxes*, and results from variances in the percentage of quarterly earnings to annual earnings.

(6) Represents the decrease in ROE from 10.40 percent in 2017 to 10.25 percent in 2018 as a result of the 2017 CPUC final decision approving an additional extension to the original 2013 Cost of Capital decision.

### Key Factors Affecting Financial Results

PG&E Corporation and the Utility believe that their financial condition, results of operations, liquidity, and cash flows may be materially affected by the following factors:

- *The Impact of the Northern California Wildfires.* PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected by potential losses resulting from the Northern California wildfires. The Utility incurred costs of $259 million for service restoration and repair to the Utility’s facilities (including $108 million in capital expenditures) through March 31, 2018, in connection with these fires. PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected if the Utility is unable to recover such costs through CEMA. If the Utility’s facilities, such as its electric distribution and transmission lines, are determined to be the substantial cause of one or more fires, and the doctrine of inverse condemnation applies, the Utility could be liable for property damage, business interruption, interest, and attorneys’ fees without having been found negligent, which liability, in the aggregate, could be substantial and have a material adverse effect on PG&E Corporation and the Utility. In addition to such claims for property damage, business interruption, interest and attorneys' fees, the Utility could be liable for fire suppression costs, evacuation costs, medical expenses, personal injury damages, and other damages under other theories of liability, including if the Utility were found to have been negligent, which liability, in the aggregate, could be substantial and have a material effect on PG&E Corporation and the Utility. Further, the Utility could be subject to material fines or penalties if the CPUC or any other law enforcement agency brought an enforcement action and determined that the Utility failed to comply with applicable laws and regulations. (See Note 9 of the Notes to the Condensed Consolidated Financial Statements in Item 1.)
- *The Applicability of the Doctrine of Inverse Condemnation in PG&E Corporation and the Utility’s Wildfire Litigation.* The doctrine of inverse condemnation, if applied by courts in litigation to which PG&E Corporation and the Utility are subject, could expose PG&E Corporation and the Utility to substantial liabilities from such litigation and materially affect PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows. Although the imposition of liability is premised on the assumption that utilities have the ability to recover these costs from their customers, there can be no guarantee that the CPUC would authorize cost recovery even if a court decision imposes liability under the doctrine of inverse condemnation. In November 2017, the CPUC denied recovery of costs that San Diego Gas & Electric Company stated it incurred as a result of the doctrine of inverse condemnation, holding that the inverse condemnation principles of strict liability are not relevant to the CPUC’s prudent manager standard. That determination is being challenged by San Diego Gas & Electric as well as by the Utility and Southern California Edison. PG&E Corporation and the Utility are also challenging the appropriateness of applying inverse condemnation to investor-owned utilities in the Butte Fire litigation and the Northern California wildfires litigation. In addition, the applicability of inverse condemnation could be impacted by actions of the California state legislature which addressed the 2017 wildfires through multiple committee hearings during the first quarter of 2018. On March 13, 2018, Governor Brown along with Democratic and Republican legislative leaders also issued a joint statement indicating an intent to partner on solutions to protect Californians from the threat of natural disasters and climate change, including an update to liability rules and regulations for utility services. (See Note 9 of the Notes to the Condensed Consolidated Financial Statements in Item 1.)
- *The Success of the Utility's Community Wildfire Safety Program.* The Utility has developed a comprehensive community wildfire safety program in coordination with first responders, civic and community leaders, and customers to help reduce wildfire threats and improve safety as a result of climate-driven wildfires and extreme weather events. The community safety wildfire program focuses on three areas: bolstering wildfire prevention and emergency response; working with communities on new and enhanced safety measures; and, longer term, hardening the electric system and integrating new technologies to increase grid resilience.
- *The Tax Cut and Jobs Act.* On December 22, 2017, the U.S. government enacted expansive tax legislation commonly referred to as the Tax Act. Among other provisions, the Tax Act reduces the federal income tax rate from 35% to 21% beginning on January 1, 2018 and eliminates bonus depreciation for utilities. On March, 30, 2018, the Utility submitted PFMs of the CPUC's final decisions in the Utility's 2017 GRC, and the 2015 GT&S rate case. Additionally, the Utility submitted updated testimony in connection with the 2019 GT&S rate case. These submittals reflect the effects of the Tax Act on these rate cases. On May 14, 2018, the Utility will file a proposal to reflect the impact of the Tax Act on its TO tariff rates effective, March 1, 2018, in the resolution of the TO19 rate case. The Utility is unable to predict the timing and outcome of the CPUC's and FERC's decisions in connection with these submittals. (See Note 9 of the Notes to the Condensed Consolidated Financial Statements in Item 1.)
- *The Outcome of Enforcement, Litigation, and Regulatory Matters.* The Utility’s financial results may continue to be impacted by the outcome of current and future enforcement, litigation, and regulatory matters, including the impact of the Northern California wildfires, the Butte fire, the safety culture OII and any related fines, penalties, or other ratemaking tools that could be imposed by the CPUC, including as a result of phase two of the proceeding, the outcome of phase two of the ex parte OII, the potential recommendations that the third-party monitor (retained by the Utility in the first quarter of 2017 as part of its compliance with the sentencing terms of the Utility’s January 27, 2017 federal criminal conviction) may make, and potential penalties in connection with the Utility’s safety and other self-reports. (See Note 9 of the Notes to the Condensed Consolidated Financial Statements in Item 1.)
- *The Timing and Outcome of Ratemaking Proceedings*. The Utility’s financial results may be impacted by the timing and outcome of its 2019 GT&S rate case, FERC TO18 and TO19 rate cases, as well as the recent remand decision by the Ninth Circuit regarding an ROE incentive adder for transmission facilities, and the 2018 CEMA filing. The outcome of regulatory proceedings can be affected by many factors, including intervening parties’ testimonies, potential rate impacts, the Utility’s reputation, the regulatory and political environments, and other factors. (See “Regulatory Matters – 2019 Gas Transmission and Storage Rate Case” and “Regulatory Matters − FERC Transmission Owner Rate Cases”.)
- *The Ability of the Utility to Control and Recover Operating Costs and Capital Expenditures.* In any given year the Utility’s ability to earn its authorized rate of return depends on its ability to manage costs within the amounts authorized in rate case decisions. The Utility forecasts that in 2018 it will incur unrecovered pipeline-related expenses ranging from $35 million to $60 million which primarily relate to costs to identify and remove encroachments from transmission pipeline rights-of-way. Also, the CPUC decision in the Utility’s 2015 GT&S rate case established various cost caps that will increase the risk of overspend over the rate case cycle through 2018.
- *The Amount and Timing of the Utility's Financing Needs.* PG&E Corporation’s and the Utility’s ability to access the capital markets, ability to borrow under its loan financing arrangements, and the terms and rates of future financings could be materially affected by the outcome of, or market perception of, the matters discussed in Note 9 of the Notes to the Condensed Consolidated Financial Statements, including liabilities, if any, incurred in relation to the Northern California wildfires, adverse effects on PG&E Corporation’s and the Utility’s ability to comply with consolidated debt to total capitalization ratio covenants in their financing arrangements and regulatory capital structure requirements, adverse changes in their respective credit ratings, general economic and market conditions, and other factors. PG&E Corporation contributes equity to the Utility as needed to maintain the Utility’s CPUC-authorized capital structure. For the three months ended March 31, 2018, PG&E Corporation issued $35 million of common stock and made no equity contributions to the Utility. PG&E Corporation may seek to issue additional equity to pay claims, losses, fines, and penalties that may be required by the outcome of litigation and enforcement matters. Additional issuances of equity, if any, could have a material dilutive impact on PG&E Corporation’s EPS.
- *Changes in the Utility Industry.* The Utility is committed to delivering safe, reliable, sustainable, and affordable electric and gas services to its customers. Increasing demands from state laws and policies relating to increased renewable energy resources, the reduction of GHG emissions, the expansion of energy efficiency programs, the development and widespread deployment of distributed generation and self-generation resources, and the development of energy storage technologies have increased pressure on the Utility to achieve efficiencies in its operations while continuing to provide customers with safe, reliable, and affordable service. The utility industry is also undergoing transformative change driven by technological advancements enabling customer choice (for example, customer-owned generation and energy storage) and state climate policy supporting a decarbonized economy. California’s environmental policy objectives are accelerating the pace and scope of the industry change. The electric grid is a critical enabler of the adoption of new energy technologies that support California's climate change and GHG reduction objectives, which continue to be publicly supported by California policy makers notwithstanding a recent change in the federal approach to such matters. In order to enable the California clean energy economy, sustained investments are required in grid modernization, renewable integration projects, energy efficiency programs, energy storage options, EV infrastructure, and state infrastructure modernization (e.g. rail and water projects). In addition, these changes brought about by technological advancements and climate policy may cause a reduction in natural gas usage and increase natural gas costs. The combination of reduced natural gas load and increased costs could result in higher natural gas customer bills and potential cost recovery risk.

For more information about the factors and risks that could affect PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows, or that could cause future results to differ from historical results, see “Item 1A. Risk Factors” in the 2017 Form 10-K and in Part II below under “Item 1A. Risk Factors.” In addition, this quarterly report contains forward-looking statements that are necessarily subject to various risks and uncertainties. These statements reflect management’s judgment and opinions that are based on current estimates, expectations, and projections about future events and assumptions regarding these events and management’s knowledge of facts as of the date of this report. See the section entitled “Forward-Looking Statements” below for a list of some of the factors that may cause actual results to differ materially. PG&E Corporation and the Utility are not able to predict all the factors that may affect future results and do not undertake an obligation to update forward-looking statements, whether in response to new information, future events, or otherwise.

### RESULTS OF OPERATIONS

The consolidated results of operations consist primarily of results related to the Utility, which are discussed in the “Utility” section below. The following table provides a summary of net income available for common shareholders for the three months ended March 31, 2018 and 2017:

*(in millions)*

|  | Three Months Ended March 31, 2018 | 2017 |
| --- | ---: | ---: |
| Consolidated Total | $442 | $576 |
| PG&E Corporation | (7) | 10 |
| Utility | $449 | $566 |

PG&E Corporation’s net income (loss) primarily consists of income taxes and interest expense on long-term debt. The decrease in PG&E Corporation’s net income for the three months ended March 31, 2018 as compared to the same period in 2017 is primarily due to the impact of income taxes.

### Utility

The table below shows certain items from the Utility’s Condensed Consolidated Statements of Income for the three months ended March 31, 2018 and 2017. The table separately identifies the revenues and costs that impacted earnings from those that did not impact earnings. In general, expenses the Utility is authorized to pass through directly to customers (such as costs to purchase electricity and natural gas, as well as costs to fund public purpose programs), and the corresponding amount of revenues collected to recover those pass-through costs, do not impact earnings. In addition, expenses that have been specifically authorized (such as the payment of pension costs) and the corresponding revenues the Utility is authorized to collect to recover such costs do not impact earnings.

Revenues that impact earnings are primarily those that have been authorized by the CPUC and the FERC to recover the Utility’s costs to own and operate its assets and to provide the Utility an opportunity to earn its authorized rate of return on rate base. Expenses that impact earnings are primarily those that the Utility incurs to own and operate its assets.

*(in millions)*

|  | Three Months Ended March 31, 2018 Revenues/Costs: That Impacted Earnings | That Did Not Impact Earnings | Total Utility | Three Months Ended March 31, 2017 Revenues/Costs: That Impacted Earnings | That Did Not Impact Earnings | Total Utility |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Electric operating revenues | $1,937 | $1,014 | $2,951 | $1,982 | $1,085 | $3,067 |
| Natural gas operating revenues | 738 | 367 | 1,105 | 777 | 427 | 1,204 |
| **Total operating revenues** | **2,675** | **1,381** | **4,056** | **2,759** | **1,512** | **4,271** |
| Cost of electricity | — | 819 | 819 | — | 847 | 847 |
| Cost of natural gas | — | 289 | 289 | — | 325 | 325 |
| Operating and maintenance | 1,244 | 353 | 1,597 | 1,164 | 354 | 1,518 |
| Depreciation, amortization, and decommissioning | 752 | — | 752 | 712 | — | 712 |
| **Total operating expenses** | **1,996** | **1,461** | **3,457** | **1,876** | **1,526** | **3,402** |
| **Operating income** | **679** | **(80)** | **599** | **883** | **(14)** | **869** |
| Interest income | 9 | — | 9 | 5 | — | 5 |
| Interest expense | (217) | — | (217) | (216) | — | (216) |
| Other income, net | 29 | 80 | 109 | 17 | 14 | 31 |
| Income before income taxes | $500 | $— | $500 | $689 | $— | $689 |
| Income tax provision (1) |  |  | 48 |  |  | 120 |
| Net income |  |  | 452 |  |  | 569 |
| Preferred stock dividend requirement (1) |  |  | 3 |  |  | 3 |
| **Income Available for Common Stock** |  |  | **$449** |  |  | **$566** |

(1) These items impacted earnings for the three months ended March 31, 2018 and 2017.

### Utility Revenues and Costs that Impacted Earnings

The following discussion presents the Utility’s operating results for the three months ended March 31, 2018 and 2017, focusing on revenues and expenses that impacted earnings for these periods.

#### Operating Revenues

The Utility’s electric and natural gas operating revenues that impacted earnings decreased by $84 million, or 3%, in the three months ended March 31, 2018, compared to the same period in 2017, primarily due to $102 million in retroactive base revenues authorized in the 2015 GT&S rate case recognized in the three months ended March 31, 2017, with no similar revenues recorded in the same period in 2018 and $81 million recorded in the three months ended March 31, 2018, as provisions for rate refunds for the 2017 GRC and the 2015 GT&S rate case as a result of the Tax Act, with no corresponding revenue reductions in the same period in 2017. These revenue reductions were partially offset by increased base revenues authorized in the 2017 GRC, 2015 GT&S rate case, and the TO18 rate case.

#### Operating and Maintenance

The Utility’s operating and maintenance expenses that impacted earnings increased by $80 million, or 7%, in the three months ended March 31, 2018 compared to the same period in 2017 primarily due an increase in environmental remediation expenses at the San Francisco Potrero Power Plant of approximately $40 million in the first quarter of 2018 as compared to the same period in 2017 and $32 million in costs related to higher premiums for liability insurance incurred during the first quarter of 2018 as compared to the same period in 2017. Additionally, the Utility incurred $21 million in legal and other costs associated with the Northern California wildfires in the three months ended March 31, 2018 with no corresponding costs in the same period in 2017.

The Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected by potential losses resulting from the impact of the Northern California wildfires and any additional charges associated with costs related to the Butte fire. (See "Item 1A. Risk Factors" in the 2017 Form 10-K and Note 9 of the Notes to the Condensed Consolidated Financial Statements in Item 1 of this Form 10-Q.)

#### Depreciation, Amortization, and Decommissioning

The Utility’s depreciation, amortization, and decommissioning expenses that impacted earnings increased by $40 million, or 6%, in the three months ended March 31, 2018 compared to the same period in 2017 primarily due to capital additions and the delay in the 2017 GRC rate case decision.

#### Interest Income and Interest Expense

There were no material changes to interest income and interest expense that impacted earnings for the periods presented.

#### Other Income, Net

There were no material changes to other income, net, that impacted earnings for the periods presented.

#### Income Tax Provision

The income tax provision decreased by $72 million, or 60%, in the three months ended March 31, 2018 as compared to the same period in 2017. The effective tax rates for the three months ended March 31, 2018 and 2017 were 9.6% and 17.4%, respectively. The decrease in the income tax provision and the effective tax rate is primarily the result of the decrease in the corporate income tax rate from 35% to 21% as a result of the Tax Act, partially offset by a reduction in tax benefits related to share-based compensation.

The following table reconciles the income tax expense at the federal statutory rate to the income tax provision:

|  | Three Months Ended March 31, 2018 | 2017 |
| --- | ---: | ---: |
| Federal statutory income tax rate | 21.0% | 35.0% |
| Increase (decrease) in income tax rate resulting from: |  |  |
| State income tax (net of federal benefit) (1) | 2.3% | 1.8% |
| Effect of regulatory treatment of fixed asset differences (2) | (16.5)% | (13.1)% |
| Tax credits | (0.6)% | (0.4)% |
| Other, net (3) | 3.4% | (5.9)% |
| **Effective tax rate** | **9.6%** | **17.4%** |

(1) Includes the effect of state flow-through ratemaking treatment.

(2) Includes the effect of federal flow-through ratemaking treatment for certain property-related costs as authorized by the 2014 GRC decision (impacting 2017) & the 2017 GRC decision (impacting 2018), and by the 2015 GT&S decision (impacting both periods presented). All amounts are impacted by the level of income before income taxes. The 2014 GRC, 2017 GRC, and 2015 GT&S rate case decisions authorized revenue requirements that reflect flow-through ratemaking for temporary income tax differences attributable to repair costs and certain other property-related costs for federal tax purposes. For these temporary tax differences, PG&E Corporation and the Utility recognize the deferred tax impact in the current period and record offsetting regulatory assets and liabilities. Therefore, PG&E Corporation’s and the Utility’s effective tax rates are impacted as these differences arise and reverse. PG&E Corporation and the Utility recognize such differences as regulatory assets or liabilities as it is probable that these amounts will be recovered from or returned to customers in future rates. The 2018 amount also reflects the impact of the amortization of excess deferred tax benefits to be refunded to customers as a result of the Tax Act passed in December of 2017.

(3) These amounts primarily represent the impact of income taxes related to share-based compensation adjustments associated with ASU 2016-09, *Compensation - Stock Compensation (Topic 718): Improvements to Employee Share-Based Payment Accounting.*

### Utility Revenues and Costs that did not Impact Earnings

Fluctuations in revenues that did not impact earnings are primarily driven by electricity and natural gas procurement costs. See below for more information.

#### Cost of Electricity

The Utility’s cost of electricity includes the cost of power purchased from third parties (including renewable energy resources), transmission, fuel used in its own generation facilities, fuel supplied to other facilities under power purchase agreements, costs to comply with California’s cap-and-trade program, and realized gains and losses on price risk management activities. (See Note 7 of the Notes to the Condensed Consolidated Financial Statements in Item 1.) The Utility’s total purchased power is driven by customer demand, the availability of the Utility’s own generation facilities (including Diablo Canyon and its hydroelectric plants), and the cost-effectiveness of each source of electricity.

*(in millions)*

|  | Three Months Ended March 31, 2018 | 2017 |
| --- | ---: | ---: |
| Cost of purchased power | $753 | $784 |
| Fuel used in own generation facilities | 66 | 63 |
| **Total cost of electricity** | **$819** | **$847** |
| Average cost of purchased power per kWh (1) | $0.123 | $0.108 |
| **Total purchased power (in millions of kWh) (2)** | **6,110** | **7,291** |

(1) Average cost of purchased power was impacted primarily by lower Utility electric customer demand, driven by customer departures to CCAs or direct access providers, and a larger percentage of higher cost renewable energy resources being allocated to the fewer remaining Utility electric customers. See further discussion in “Legislative and Regulatory Initiatives - Power Charge Indifference Adjustment OIR”, below.

(2) The decrease in purchased power for the three months ended March 31, 2018 compared to the same period in 2017 was primarily due to lower Utility electric customer demand.

#### Cost of Natural Gas

The Utility’s cost of natural gas includes the costs of procurement, storage and transportation of natural gas, costs to comply with California’s cap-and-trade program, and realized gains and losses on price risk management activities. (See Note 7 of the Notes to the Condensed Consolidated Financial Statements in Item 1.) The Utility’s cost of natural gas is impacted by the market price of natural gas, changes in the cost of storage and transportation, and changes in customer demand.

*(in millions)*

|  | Three Months Ended March 31, 2018 | 2017 |
| --- | ---: | ---: |
| Cost of natural gas sold | $257 | $293 |
| Transportation cost of natural gas sold | 32 | 32 |
| **Total cost of natural gas** | **$289** | **$325** |
| Average cost per Mcf (1) of natural gas sold | $3.03 | $3.15 |
| **Total natural gas sold (in millions of Mcf)** | **85** | **93** |

(1) One thousand cubic feet

#### Operating and Maintenance Expenses

The Utility’s operating expenses that did not impact earnings include certain costs that the Utility is authorized to recover as incurred such as pension contributions and public purpose programs costs. If the Utility were to spend more than authorized amounts, these expenses could have an impact to earnings.

#### Other Income, Net

The Utility’s other income, net that did not impact earnings includes pension and other post-retirement benefit costs that fluctuate primarily from market and interest rate changes.

### LIQUIDITY AND FINANCIAL RESOURCES

### Overview

The Utility’s ability to fund operations, finance capital expenditures, and make distributions to PG&E Corporation depends on the levels of its operating cash flows and access to the capital and credit markets. The CPUC authorizes the Utility’s capital structure, the aggregate amount of long-term and short-term debt that the Utility may issue, and the revenue requirements the Utility is able to collect to recover its cost of capital. The Utility generally utilizes equity contributions from PG&E Corporation and long-term senior unsecured debt issuances to maintain its CPUC-authorized capital structure consisting of 52% equity and 48% debt and preferred stock. The Utility relies on short-term debt, including commercial paper, to fund temporary financing needs.

PG&E Corporation’s ability to fund operations, make scheduled principal and interest payments, fund equity contributions to the Utility, and declare and pay dividends primarily depends on the level of cash distributions received from the Utility and PG&E Corporation’s access to the capital and credit markets. PG&E Corporation's equity contributions to the Utility are funded primarily through common stock issuances. PG&E Corporation has material stand-alone cash flows related to the issuance of equity and long-term debt, and issuances and repayments under its revolving credit facility and commercial paper program. PG&E Corporation relies on short-term debt, including commercial paper, to fund temporary financing needs.

PG&E Corporation’s and the Utility’s credit ratings may be affected by the ultimate outcome of pending enforcement and litigation matters, including the outcome of the uncertainties and potential liabilities associated with the Northern California wildfires. Credit rating downgrades may increase the cost and availability of short-term borrowing, including commercial paper, the costs associated with credit facilities, and long-term debt costs. In addition, some of the Utility’s commodity contracts contain collateral posting provisions tied to the Utility’s credit rating from each of the major credit rating agencies. During the first quarter of 2018, Fitch Ratings, Standard & Poor’s Global Ratings, and Moody's Investors Service, Inc. downgraded PG&E Corporation's and the Utility’s credit ratings. At March 31, 2018, PG&E Corporation's and the Utility's credit ratings remained at investment grade levels. If the Utility’s credit rating were to fall below investment grade, the Utility estimates it would be required to fully collateralize up to $800 million in net liability positions. (See Note 7 and Note 9 of the Notes to the Condensed Consolidated Financial Statements in Item 1.)

PG&E Corporation's and the Utility's equity needs could increase materially and its liquidity and cash flows could be materially affected by potential costs and other liabilities in connection with the Northern California wildfires. The Utility’s equity needs will continue to be affected by the timing and amount of disallowed capital expenditures, and by fines, penalties and claims that may be imposed in connection with the matters described in Note 9 of the Notes to the Condensed Consolidated Financial Statements in Item 1, "Part II. Other Information, Item 1. Legal Proceedings," and in the 2017 Form 10-K. In addition, PG&E Corporation’s and the Utility’s ability to access the capital markets in a manner consistent with its past practices, if at all, could be adversely affected by such matters. (See “Item 1A. Risk Factors” in the 2017 Form 10-K and in Part II below under “Item 1A. Risk Factors”.)

### Cash and Cash Equivalents

Cash and cash equivalents consist of cash and short-term, highly liquid investments with original maturities of three months or less. PG&E Corporation and the Utility maintain separate bank accounts and primarily invest their cash in money market funds.

### Financial Resources

### Debt and Equity Financings

There were no issuances under the PG&E Corporation February 2017 equity distribution agreement for the three months ended March 31, 2018. As of March 31, 2018, the remaining gross sales available under this agreement were $246.3 million.

PG&E Corporation issued common stock under the PG&E Corporation 401(k) plan and share-based compensation plans. During the three months ended March 31, 2018, 1.2 million shares were issued for cash proceeds of $35.1 million under these plans. The proceeds from these sales were used for general corporate purposes.

In January 2018, the Utility sent a notice of redemption to redeem all $400 million aggregate principal amount of the 8.25% Senior Notes due October 15, 2018. On January 31, 2018, the Utility deposited with the trustee funds sufficient to effect the early redemption of these bonds and satisfy and discharge its remaining obligation of $400 million on February 18, 2018.

In February 2018, the Utility’s $250 million floating rate unsecured term loan, issued in February 2017, matured and was repaid. Additionally, in February 2018, the Utility entered into a $250 million floating rate unsecured term loan that will mature on February 22, 2019. The proceeds were used for general corporate purposes, including the repayment of a portion of the Utility’s outstanding commercial paper.

In April 2018, PG&E Corporation entered into a $350 million floating rate unsecured term loan. The term loan matures on April 16, 2020, unless extended by PG&E Corporation pursuant to the terms of the term loan agreement. The proceeds were used for general corporate purposes, including the early redemption of PG&E Corporation's outstanding $350 million principal amount of 2.40% Senior Notes due March 1, 2019. On April 16, 2018, PG&E Corporation issued a notice of early redemption of these bonds, with a redemption date of April 26, 2018.

### Revolving Credit Facilities and Commercial Paper Programs

At March 31, 2018, PG&E Corporation and the Utility had $179 million and $2.9 billion available under their respective $300 million and $3.0 billion revolving credit facilities. (See Note 4 of the Notes to the Condensed Consolidated Financial Statements in Item 1.)

PG&E Corporation and the Utility can issue commercial paper up to the maximum amounts of $300 million and $2.5 billion, respectively. For the three months ended March 31, 2018, PG&E Corporation and the Utility had an average outstanding commercial paper balance of $114 million and $31 million, and a maximum outstanding balance of $137 million and $205 million, respectively. At March 31, 2018, PG&E Corporation and the Utility had outstanding commercial paper balances of $121 million and $97 million, respectively.

The revolving credit facilities require that PG&E Corporation and the Utility maintain a ratio of total consolidated debt to total consolidated capitalization of at most 65% as of the end of each fiscal quarter. At March 31, 2018, PG&E Corporation’s and the Utility’s total consolidated debt to total consolidated capitalization was 49% and 48%, respectively. PG&E Corporation’s revolving credit facility agreement also requires that PG&E Corporation own, directly or indirectly, at least 80% of the common stock and at least 70% of the voting capital stock of the Utility. In addition, the revolving credit facilities include usual and customary provisions regarding events of default and covenants including covenants limiting liens to those permitted under PG&E Corporation’s and the Utility’s senior note indentures, mergers, and imposing conditions on the sale of all or substantially all of PG&E Corporation’s and the Utility’s assets and other fundamental changes. At March 31, 2018, PG&E Corporation and the Utility were in compliance with all covenants under their respective revolving credit facilities.

### Dividends

On December 20, 2017, the Boards of Directors of PG&E Corporation and the Utility suspended quarterly cash dividends on both PG&E Corporation’s and the Utility’s common stock, beginning the fourth quarter of 2017, as well as the Utility’s preferred stock, beginning the three-month period ending January 31, 2018, due to the uncertainty related to the causes of and potential liabilities associated with the Northern California wildfires. (See Note 9 of the Notes to the Condensed Consolidated Financial Statements in Item 1.)

### Utility Cash Flows

The Utility’s cash flows were as follows:

*(in millions)*

|  | Three Months Ended March 31, 2018 | 2017 |
| --- | ---: | ---: |
| Net cash provided by operating activities | $1,516 | $1,598 |
| Net cash used in investing activities | (1,475) | (1,235) |
| Net cash used in financing activities | (366) | (374) |
| **Net change in cash and cash equivalents** | **$(325)** | **$(11)** |

57

### Operating Activities

The Utility’s cash flows from operating activities primarily consist of receipts from customers less payments of operating expenses, other than expenses such as depreciation that do not require the use of cash. During the three months ended March 31, 2018, net cash provided by operating activities decreased by $82 million compared to the same period in 2017. This decrease was due to fluctuations in activities within the normal course of business such as the timing and amount of customer billings and collections and vendor billings and payments.

Future cash flow from operating activities will be affected by various factors, including:

- the timing and amount of costs in connection with the Northern California wildfires, as well as potential liabilities in connection with third-party claims and fines or penalties that could be imposed on the Utility if the CPUC or any other law enforcement agency brought an enforcement action and determined that the Utility failed to comply with applicable laws and regulations;
- the timing and amounts of costs, including fines and penalties, that may be incurred in connection with the current and future enforcement, litigation, and regulatory matters, including the impact of the Butte fire and the timing and amount of related insurance recoveries, the safety culture OII, including other ratemaking tools that could be imposed by the CPUC as a result of phase two of the proceeding, the outcome of phase two of the ex parte OII, costs associated with potential recommendations that the third-party monitor may make related to the Utility’s conviction in the federal criminal trial, and potential penalties in connection with the Utility’s safety and other self-reports;
- the Tax Act, which is expected to accelerate the timing of federal tax payments and reduce revenue requirements, resulting in lower operating cash flows (see "Overview" above and "Regulatory Matters" below for more information);
- the timing and outcomes of the 2019 GT&S rate case, FERC TO18 and TO19 rate cases, 2018 CEMA filing, and other ratemaking and regulatory proceedings; and
- the timing of the resolution of the Chapter 11 disputed claims and the amount of principal and interest on these claims that the Utility will be required to pay.

### Investing Activities

Net cash used in investing activities increased by $240 million during the three months ended March 31, 2018 as compared to the same period in 2017 primarily due to an increase in capital expenditures of approximately $250 million. The Utility’s investing activities primarily consist of construction of new and replacement facilities necessary to provide safe and reliable electricity and natural gas services to its customers. Cash used in investing activities also includes the proceeds from sales of nuclear decommissioning trust investments which are largely offset by the amount of cash used to purchase new nuclear decommissioning trust investments. The funds in the decommissioning trusts, along with accumulated earnings, are used exclusively for decommissioning and dismantling the Utility’s nuclear generation facilities.

The Utility's capital expenditures were approximately $5.7 billion in 2017. Future cash flows used in investing activities are largely dependent on the timing and amount of capital expenditures. The Utility estimates that it will incur approximately $6.3 billion in capital expenditures in 2018, and $6.0 billion in 2019.

### Financing Activities

Net cash used in financing activities decreased by $8 million during the three months ended March 31, 2018 as compared to the same period in 2017. This decrease was primarily due to the suspension of dividend payments (see "Dividends" section above), partially offset by an increase in net repayments of short-term and long-term borrowings.

Cash provided by or used in financing activities is driven by the Utility’s financing needs, which depend on the level of cash provided by or used in operating activities, the level of cash provided by or used in investing activities, the conditions in the capital markets, and the maturity date of existing debt instruments. The Utility generally utilizes long-term debt issuances and equity contributions from PG&E Corporation to maintain its CPUC-authorized capital structure, and relies on short-term debt to fund temporary financing needs.

### ENFORCEMENT AND LITIGATION MATTERS

PG&E Corporation and the Utility have significant contingencies arising from their operations, including contingencies related to the enforcement and litigation matters described in Note 9 of the Notes to the Condensed Consolidated Financial Statements in Item 1. The outcome of these matters, individually or in the aggregate, could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, and cash flows. In addition, PG&E Corporation and the Utility are involved in other enforcement and litigation matters described in the 2017 Form 10-K and “Part II. Other Information, Item 1. Legal Proceedings.”

### REGULATORY MATTERS

The Utility is subject to substantial regulation by the CPUC, the FERC, the NRC and other federal and state regulatory agencies. The resolutions of these and other proceedings may affect PG&E Corporation's and the Utility's financial condition, results of operations, and cash flows. Significant regulatory developments that have occurred since the 2017 Form 10-K was filed with the SEC are discussed below.

### 2017 General Rate Case

On May 11, 2017, the CPUC issued a final decision in the Utility’s 2017 GRC, which determined the annual amount of base revenues (or “revenue requirements”) that the Utility is authorized to collect from customers from 2017 through 2019 to recover its anticipated costs for electric distribution, natural gas distribution, and electric generation operations and to provide the Utility an opportunity to earn its authorized rate of return. The final decision approved, with certain modifications, the settlement agreement that the Utility, the ORA, TURN, and 12 other intervening parties jointly submitted to the CPUC on August 3, 2016 (the “settlement agreement”). The final decision approved a revenue requirement increase of $88 million for 2017, with additional increases of $444 million in 2018 and $361 million in 2019, in line with the amounts proposed in the settlement agreement.

As required by the final decision, the Utility has submitted a variety of compliance filings, including a filing on June 12, 2017, which provides an accounting for the January 2017 $300 million expense reduction announcement and on July 10, 2017, providing an update of the cost effectiveness study for the SmartMeter™ Upgrade project. On February 8, 2018, the CPUC extended the statutory deadline for the 2017 GRC from February 8, 2018 to August 9, 2018, to allow for comments and CPUC action on the SmartMeter™ Upgrade cost effectiveness study, as well as the scope and schedule for an audit of expenditures under the Utility's electric distribution undergrounding program.

As a result of the Tax Act, on March 30, 2018, the Utility submitted to the CPUC a PFM of the CPUC's final decision in the 2017 GRC. The PFM, if adopted, would reduce revenue requirements by $267 million and $296 million for 2018 and 2019 respectively, and increase rate base by $199 million and $425 million for 2018 and 2019, respectively. The Utility has proposed to work with the CPUC staff to implement rate changes under a schedule that minimizes rate volatility, which could defer some rate impacts beyond 2018. The timing of rate changes will also have an impact on the Utility's financing needs. The Utility cannot predict the timing and outcome of this PFM.

For more information, see the 2017 Form 10-K.

### 2020 General Rate Case and RAMP Filing

On November 30, 2017, the Utility filed its first RAMP report with the CPUC in advance of its 2020 GRC filing. The RAMP is a new CPUC requirement directing each large investor-owned energy utility to submit a report describing how it assesses its risks and how it plans to mitigate and minimize such risks in advance of the utility’s GRC application. The objective of this report is to inform the CPUC of the utility’s top safety-related risks, risk assessment procedures, and proposed mitigations of those risks for 2020-2022.

On April 3, 2018, the SED released a report assessing the Utility's RAMP report. The SED report requested, among other items, an updated risk analysis regarding wildfire risk mitigation strategies in the Utility's 2020 GRC. A workshop on the report was held on April 17, 2018, and the parties will submit comments on May 10, 2018. The RAMP results will be incorporated in the Utility’s 2020 GRC.

The Utility expects to file the 2020 GRC by September 1, 2018.

### 2015 Gas Transmission and Storage Rate Case

During 2016, the CPUC issued final decisions in phases one and two of the Utility’s 2015 GT&S rate case. The phase one decision adopted the revenue requirements that the Utility is authorized to collect through rates beginning August 1, 2016, to recover its costs of gas transmission and storage services for the 2015 GT&S rate case period (2015 through 2018). The phase two decision determined the allocation of the $850 million penalty assessed in the San Bruno Penalty Decision and the revenue requirement reduction for the five-month delay caused by the Utility’s violation of the CPUC ex parte communication rules in this proceeding.

The phase one decision excluded from rate base $696 million of capital spending in 2011 through 2014 in excess of the amount adopted. The decision permanently disallowed $120 million of that amount and ordered that the remaining $576 million be subject to an audit overseen by the CPUC staff, with the possibility that the Utility may seek recovery in a future proceeding. The Utility would be required to take a charge in the future if the CPUC’s audit of 2011 through 2014 capital spending resulted in additional permanent disallowance. The decision established new one-way balancing accounts to track certain costs as well as various cost caps that will increase the risk of disallowance over the current rate case cycle.

As a result of the Tax Act, on March 30, 2018, the Utility submitted to the CPUC a PFM of the CPUC's final decision in the 2015 GT&S rate case. The PFM, if adopted, would reduce revenue requirements by $58 million and increase rate base by $12 million for 2018 (excluding the impact of an approximately $9 million increase in revenue requirement and a $60 million increase in rate base associated with the Utility's private letter ruling advice letter that is currently pending). The Utility has proposed to work with the CPUC staff to implement rate changes under a schedule that minimizes rate volatility, which could defer some rate impacts beyond 2018. The timing of rate changes will also have an impact on the Utility's financing needs. The Utility cannot predict the timing and outcome of this PFM.

In August 2016 and January 2017, TURN, ORA and Indicated Shippers filed applications for rehearing of the phase one and phase two decisions. The Utility cannot predict when or if the CPUC will grant the rehearings or if it will adopt the parties’ recommendations. Additionally, in June 2017, the Utility filed a PFM of the phase one decision to eliminate the requirement that the Utility install new cathodic protection systems in 2018 because the Utility is not in a position to identify the optimal location for such new systems in 2018. Instead, the Utility requested to be allowed to continue its current cathodic protection program. On April 26, 2018, the CPUC issued a final decision granting the Utility's PFM.

For more information, see the 2017 Form 10-K.

### 2019 Gas Transmission and Storage Rate Case

On November 17, 2017, the Utility filed its 2019 GT&S rate case application with the CPUC, covering the years 2019 through 2021. While the Utility has not formally proposed a fourth year for this rate case, it provided a revenue requirement and rates for 2022, in the event the CPUC adopts an additional year.

In its application, the Utility requested that the CPUC authorize a 2019 revenue requirement of $1.59 billion to recover anticipated costs of providing natural gas transmission and storage services beginning on January 1, 2019. This corresponds to an increase of $289 million over the Utility’s 2018 authorized revenue requirement of $1.30 billion. The Utility’s request also includes proposed revenue requirements of $1.73 billion for 2020, $1.91 billion for 2021, and $1.91 billion for 2022 if the CPUC orders a fourth year for the rate case period.

The requested rate base for 2019 is $4.66 billion, which corresponds to an increase of $0.95 billion over the 2018 authorized rate base of $3.71 billion. These rate base amounts exclude approximately $576 million of capital spending subject to audit by the CPUC related to 2011 through 2014 expenditures in excess of amounts adopted in the 2011 GT&S rate case. The Utility is unable to predict whether the $576 million, or a portion thereof, will ultimately be authorized by the CPUC and included in the Utility’s future rate base. The Utility’s request also excludes rate base adjustments that the Utility requested with the CPUC on November 14, 2017, resulting from the Internal Revenue Service’s October 5, 2017 private letter ruling issued in connection with the CPUC’s final phase two decision in the 2015 GT&S rate case. The Utility’s request is based on capital expenditure forecasts of $971 million for 2019, $963 million for 2020, and $804 million for 2021 (which exclude common capital allocations).

The increase in revenue requirement is largely attributable to increased infrastructure investment and costs related to new natural gas storage safety and environmental regulations. Such new regulations were issued by: (1) DOGGR, which issued emergency safety and reliability natural gas storage measures in 2016 in response to the 2015 Southern California natural gas storage leak in Aliso Canyon. The final rule-making on new gas storage safety rules is expected in 2018; (2) the Pipeline and Hazardous Materials Safety Administration, which issued interim final rules, effective January 18, 2017, that address pipeline safety issues and mandate certain reporting requirements for operators of underground natural gas storage facilities; and (3) the CPUC, which issued General Order 112-F that became effective on January 1, 2017, and requires additional expenditures in the areas of gas leak repair, leak survey, and high consequence area identification, among other things. In its application, the Utility proposes a new two-way gas storage balancing account to address uncertainty around the anticipated DOGGR regulations, and also proposes a new memorandum account to track costs related to other anticipated new regulations.

As a result of the existing and anticipated gas storage safety requirements, the Utility developed and proposed in its 2019 GT&S rate case application a natural gas storage strategy which includes the discontinuation (through closure or sale) of operations at two gas storage fields. The discontinuation is expected to reduce long-term costs for customers and to reduce safety and environmental risks.

As a result of the Tax Act, on March 30, 2018, the Utility submitted updated testimony to the CPUC. The updated testimony, including the pending private letter ruling advice letter, reduces the Utility's previously forecasted revenue requirement by $25 million for 2019, $30 million for 2020, $22 million for 2021, and $5 million for 2022, and increases rate base by $188 million for 2019, $254 million for 2020, $378 million for 2021, and $469 million for 2022. The Utility cannot predict the timing and outcome of this submittal.

On April 24, 2018, the CPUC issued a scoping memo and ruling establishing a procedural schedule. Testimony is scheduled to be served in the second and third quarter of 2018, and evidentiary hearings are scheduled to begin in the third quarter of 2018.

For more information, see the 2017 Form 10-K.

### Transmission Owner Rate Cases

#### Transmission Owner Rate Case for 2017 (the "TO18" rate case)

On July 29, 2016, the Utility filed its TO18 rate case at the FERC requesting a 2017 retail electric transmission revenue requirement of $1.72 billion, a $387 million increase over the 2016 revenue requirement of $1.33 billion. The forecasted network transmission rate base for 2017 was $6.7 billion. The Utility is seeking a return on equity of 10.9%, which includes an incentive component of 50 basis points for the Utility’s continuing participation in the CAISO. In the filing, the Utility forecasted that it would make investments of $1.30 billion in 2017 in various capital projects.

On September 30, 2016, the FERC issued an order accepting the Utility’s July 2016 filing and set it for hearing, but held the hearing procedures in abeyance for settlement procedures. The order set an effective date for rates of March 1, 2017, and made the rates subject to refund following resolution of the case. On March 17, 2017, the FERC issued an order terminating the settlement procedures due to an impasse in the settlement negotiations reported by the parties.

Hearings were held from January 9, 2018 through January 30, 2018. During the hearings, the Utility, intervenors, and the FERC trial staff, addressed questions relating to return on equity, capital structure, depreciation rates, capital additions, rate base, operating and maintenance expense, administrative and general expense, and the allocation of common, general and intangible costs. On April 11, 2018, the FERC extended the initial decision deadline from June 1, 2018, to October 1, 2018.

Also, on March 31, 2017, several of the parties that had already intervened in the TO18 rate case filed a complaint at the FERC, and requested that the complaint be consolidated with the rate case. The complaint asserts that the Utility’s revenue requirement request in TO18 is unreasonably high and should be reduced. The complaint asks that, if the outcome of the litigation in TO18 is that the Utility’s revenue requirement should be set at a lower level than the revenue requirement from the TO17 settlement, that the FERC order refunds to that lower level determined in TO18 litigation. On April 20, 2017, the Utility answered the complaint, requesting that FERC dismiss it. On November 16, 2017, FERC dismissed the complaint as the Utility had requested. On December 18, 2017, the complainants filed a request for rehearing of that order, and on January 16, 2018, FERC issued an order granting rehearing for further consideration. That order does not address the merits of the complaint; it simply gives FERC more time to reconsider its prior order dismissing the complaint. The Utility is unable to predict when FERC may issue an order on the merits of the complaint.

#### Transmission Owner Rate Case for 2018 (the "TO19" rate case)

On July 27, 2017, the Utility filed its TO19 rate case at the FERC requesting a 2018 retail electric transmission revenue requirement of $1.79 billion, a $74 million increase over the proposed 2017 revenue requirement of $1.72 billion. The forecasted network transmission rate base for 2018 is $6.9 billion. The Utility is seeking an ROE of 10.75%, which includes an incentive component of 50 basis points for the Utility’s continuing participation in the CAISO. In the filing, the Utility forecasted capital expenditures of approximately $1.4 billion. On September 28, 2017, the FERC issued an order accepting the Utility’s July 2017 filing, subject to hearing and refund, and established March 1, 2018, as the effective date for rate changes. FERC also ordered that the hearings be held in abeyance pending settlement discussion among the parties. The next settlement conference is scheduled for May 16, 2018.

In response to a FERC order, on May 14, 2018, the Utility will file a proposal to reflect the impact of the Tax Act on its TO tariff rates effective, March 1, 2018, in the resolution of the TO19 rate case. The Utility cannot predict the timing and outcome of FERC's response.

On September 29, 2017, several of the parties that have intervened in the TO18 rate case filed a complaint at the FERC, and requested that the complaint be consolidated with the TO19 rate case. The TO19 complaint asserts that the Utility’s revenue requirement request in TO19 is unreasonably high and should be reduced. The complaint asks that, if the outcome of the litigation in TO19 is that the Utility’s revenue requirement should be set at a lower level than the settled revenue requirement approved by FERC in TO18, FERC order refunds to that lower level determined in the TO19 litigation. On October 17, 2017, the Utility answered the complaint, requesting that FERC dismiss it. The Utility is unable to predict when and how the FERC will respond to the complaint.

#### Transmission Owner Rate Cases for 2015 and 2016 (the “TO16” and “TO17” rate cases, respectively)

On January 8, 2018, the Ninth Circuit Court of Appeals issued an opinion granting an appeal of FERC’s decisions in the TO16 and TO17 rate cases to grant the Utility a 50 basis point ROE incentive adder for its continued participation in the CAISO. Those decisions have been remanded to FERC for further proceedings consistent with the Court of Appeals’ opinion. If FERC concludes on remand that the Utility is no longer authorized to receive the 50 basis point ROE incentive adder, the Utility would incur a refund obligation of $1 million and $8.5 million for TO16 and TO17, respectively. Alternatively, if FERC again concludes that the Utility should receive the 50 basis point ROE incentive adder and provides the additional explanation that the Ninth Circuit found the FERC’s prior decisions lacked, then the Utility would not owe any refunds for this issue for TO16 or TO17.

On February 28, 2018, the Utility filed a motion to establish procedures on remand requesting a paper hearing and additional briefing on the issues identified in the Ninth Circuit Court's opinion. The Utility is unable to predict the timing and outcome of FERC’s response to this motion.

For more information, see the 2017 Form 10-K.

### Diablo Canyon Nuclear Power Plant

#### Joint Proposal for Plant Retirement

On August 11, 2016, the Utility submitted an application to the CPUC to retire Diablo Canyon at the expiration of its current operating licenses in 2024 and 2025 and replace it with a portfolio of energy efficiency and GHG-free resources. The application implements a joint proposal between the Utility and the Friends of the Earth, Natural Resources Defense Council, Environment California, International Brotherhood of Electrical Workers Local 1245, Coalition of California Utility Employees, and Alliance for Nuclear Responsibility (together, the “Joint Parties”).

On January 11, 2018, the CPUC issued a final decision in the Utility’s proposal to retire Diablo Canyon Unit 1 by 2024 and Unit 2 by 2025. The CPUC also:

- deferred consideration of replacement resources to the CPUC’s Integrated Resource Planning proceeding;
- authorized rate recovery for up to $211.3 million (compared with the $352.1 million requested by the Utility) for an employee retention program;
- authorized rate recovery for an employee retraining program of $11.3 million requested by the Utility;
- rejected rate recovery of the proposed $85 million for the community impacts mitigation program on the ground that rate recovery for such a program requires legislative authorization;
- authorized rate recovery of $18.6 million of the total Diablo Canyon license renewal cost of $53 million and rate recovery of cancelled project costs equal to 100% of direct costs incurred prior to June 30, 2016, and 25% of direct costs incurred after June 30, 2016, based on a settlement agreement among the Utility, the Joint Parties, and certain other parties that the Utility filed with the CPUC in May 2017; and
- approved the amortization of the book value for Diablo Canyon consistent with the Diablo Canyon closure schedule.

On March 7, 2018, the Utility submitted a request to the NRC to withdraw its Diablo Canyon license renewal application.

On March 16, 2018, California legislative leaders announced they are moving forward with legislation in the California Assembly to meet the key remaining goals of the Diablo Canyon joint proposal agreement. The bill, Senate Bill 1090, seeks to:

- require the CPUC to approve the community impact mitigation settlement of $85 million, originally proposed in the joint settlement agreement;
- direct the CPUC to manage its Integrated Resource Planning to ensure that there is no increase in GHG emissions as a result of the Diablo Canyon retirement; and
- require the CPUC to approve full funding of the $352.1 million Diablo Canyon employee retention program, originally proposed in the joint settlement agreement.

#### California State Lands Commission Lands Lease

On June 28, 2016, the California State Lands Commission approved a new lands lease for the intake and discharge structures at Diablo Canyon to run concurrently with Diablo Canyon’s current operating licenses, until Diablo Canyon Unit 2 ceases operations in August 2025. The Utility believes that the approval of the new lease will ensure sufficient time for the Utility to identify and bring online a portfolio of GHG-free replacement resources. The Utility will submit a future lease extension request to address the period of time required for plant decommissioning, which under NRC regulations can take as long as 60 years. On August 28, 2016, the World Business Academy filed a writ in the Los Angeles Superior Court asserting that the State Lands Commission committed legal error when it determined that the short term lease extension for an existing facility was exempt from review under the California Environmental Quality Act and alleging that the State Lands Commission should be required to perform an environmental review of the new lands lease. The trial took place on July 11, 2017, in Los Angeles Superior Court and the judge dismissed the petition on all grounds, ruling that the State Lands Commission properly determined the short term lease extension was subject to the existing facilities exemption under the California Environmental Quality Act. The World Business Academy appealed this decision and the matter is currently before the California Court of Appeals in Los Angeles, Second District. The trial date has not been set. The Utility is unable to predict the timing and outcome of this proceeding.

#### Asset Retirement Obligations

The Utility expects that the decommissioning of Diablo Canyon will take many years after the expiration of its current operating licenses. Detailed studies of the cost to decommission the Utility’s nuclear generation facilities are conducted every three years in conjunction with the NDCTP. Actual decommissioning costs may vary from these estimates as a result of changes in assumptions such as decommissioning dates; regulatory requirements; technology; and costs of labor, materials, and equipment. The Utility recovers its revenue requirements for decommissioning costs from customers through a non-bypassable charge that the Utility expects will continue until those costs are fully recovered.

While the current NDCTP forecast includes employee severance program estimates, it does not include estimated costs related to the final decision’s employee retention and retraining and development programs, and the San Luis Obispo County community mitigation program; the employee retraining program costs will be included in future cost estimates. The Utility intends to conduct a site-specific decommissioning study to update the 2015 NDCTP forecast and to submit the study to the CPUC by mid-2019.

The Utility expects to file its 2018 NDCTP application in late 2018 or early 2019. For more information, see "Asset Retirement Obligations" in Note 2 of the Notes to the Consolidated Financial Statements in Item 8 of the 2017 Form 10-K.

### Application to Establish a Wildfire Expense Memorandum Account

On July 26, 2017, the Utility filed an application with the CPUC requesting to establish a WEMA to track wildfire expenses and to preserve the opportunity for the Utility to request recovery of wildfire costs in excess of insurance at a future date. Concurrently with this application, the Utility also submitted a motion to the CPUC requesting that the WEMA be deemed effective as of July 26, 2017, such that the Utility may begin recording costs to the account while the application is pending before the CPUC.

Under the WEMA as proposed, the Utility would record costs related to wildfires, including: (1) payments to satisfy wildfire claims, including any deductibles, co-insurance and other insurance expense paid by the Utility but excluding costs that have already been authorized in the Utility’s GRC; (2) outside legal costs incurred in the defense of wildfire claims; (3) insurance premium costs not in rates; and (4) the cost of financing these amounts. Insurance proceeds, as well as any payments received from third parties, would be credited to the WEMA as they are received. The WEMA would not include the Utility’s costs for fire response and infrastructure costs which are tracked in CEMA. The Utility would be required to file an application to seek approval to recover costs tracked in WEMA.

A prehearing conference was held on December 8, 2017, and a scoping memo was issued on January 11, 2018. The Utility filed its opening brief with the CPUC on January 25, 2018, and other parties’ briefs were filed on February 15, 2018. On February 22, 2018, the Utility filed its reply brief. The Utility cannot predict the timing and outcome of this proceeding.

### Catastrophic Event Memorandum Account Applications

The CPUC allows utilities to recover the reasonable, incremental costs of responding to catastrophic events through a CEMA. The CEMA tariff authorizes the utilities to recover costs incurred in connection with a catastrophic event that has been declared a disaster or state of emergency by competent federal or state authorities. In 2014, the CPUC directed the Utility to perform additional fire prevention and vegetation management work in response to the severe drought in California. The costs associated with this work were tracked in the CEMA. While the Utility believes such costs are recoverable through CEMA, its CEMA applications are subject to CPUC approval.

#### 2016 CEMA Application

In 2016, the Utility submitted a request to the CPUC to authorize recovery under the CEMA tariff revenue requirement of approximately $146 million for recorded capital and expense costs related to the 2015 drought mitigations and emergency response activities for declared disasters that occurred from December 2012 through March 2016. On January 4, 2018, ORA, TURN, and the Utility filed an all-party motion with the CPUC seeking approval of a settlement agreement these parties have entered into. The settlement agreement proposes that the Utility’s total CEMA revenue requirement request be reduced by $29 million, from $146 million to $117 million.

#### 2018 CEMA Application

On March 30, 2018, the Utility submitted to the CPUC its 2018 CEMA application requesting cost recovery of $183 million in connection with nine catastrophic events that included fire and storm declared emergencies from the middle of 2016 through early 2017, and $405 million for work to cut back or remove dead or dying trees in 2016 and 2017 resulting from years of drought conditions and associated bark beetle infestation. The 2018 CEMA application also seeks cost recovery of $555 million on a forecast basis for additional tree mortality and fire mitigation work anticipated in 2018 and 2019.

In the application, the Utility proposed to recover the authorized CEMA expenses and capital costs that have already been incurred over a two-year period beginning on January 1, 2019, or as soon as possible thereafter. With respect to the Utility’s forecasted expenses for 2018 and 2019, the Utility proposed to recover the 2018 and 2019 revenue requirements over a two-year period beginning on January 1, 2019. The 2018 CEMA application does not include costs related to Butte fire or the October 2017 Northern California wildfires. The Utility has requested a decision by the end of 2018.

PG&E Corporation and the Utility are unable to predict the outcomes of these proceedings.

### Other Regulatory Proceedings

#### Transportation Electrification

California Law (Senate Bill 350) requires the CPUC, in consultation with the California Air Resources Board and the CEC, to direct electrical corporations to file applications for programs and investments to accelerate widespread TE. In September 2016, the CPUC directed the Utility and the other large IOUs to file TE applications which include both short-term projects (of up to $20 million in total) and two- to five-year programs with a requested revenue requirement determined by the Utility.

On January 20, 2017, the Utility filed its TE application with the CPUC requesting a total of up to $253 million (approximately $211 million in capital expenditures) in program funding over five years (2018-2022) related to make-ready infrastructure for TE in medium to heavy-duty vehicle sectors, fast charging stations, and short-term projects which includes a series of TE demonstration projects and pilot programs. On January 11, 2018, the CPUC approved, with modifications, four out of the five short-term projects proposed by the Utility for a total of approximately $8 million.

On March 30, 2018, the CPUC issued a proposed decision approving, with modifications, the Utility’s standard review program proposals for approximately $238 million ($198 million of capital expenditures) to support make-ready infrastructure supporting public fast charging and medium to heavy-duty fleets. In the FleetReady program, the Utility will have a goal of providing utility-owned make-ready infrastructure at 700 sites, conducting operation and maintenance of installed infrastructure, and educating customers on the benefits of electric vehicles. The proposed decision would give customers the option of owning the make-ready infrastructure installed beyond the customer meter in lieu of utility ownership. The Fast Charge program will have a goal to install make-ready infrastructure at 52 public charging sites, increase access to charging stations for customers, and reduce driver range anxiety. The costs associated with the standard review projects will be tracked in a one-way balancing account. The CPUC is expected to issue a final decision in the second quarter of 2018.

#### Electric Distribution Resources Plan

As required by California law, on July 1, 2015, the Utility filed its proposed electric distribution resources plan for approval by the CPUC. The Utility’s plan identifies optimal locations on its electric distribution system for deployment of DERs. The Utility’s proposal is designed to allow energy technologies to be integrated into the larger grid while continuing to provide customers with safe, reliable, and affordable electric service.

The CPUC issued a final decision on February 15, 2018, requiring the California IOUs to use the CEC’s DER forecast for the 2018-2019 distribution planning cycle. The decision also requires the IOUs to develop an alternative planning forecast scenario in 2018 to establish a method for calculating costs and benefits for DER grid integration to better inform DER sourcing policies. The Utility has historically used the CEC forecast for planning and will have the opportunity to adjust forecasts for EV, photovoltaic, and energy storage, if needed during the planning cycle.

The CPUC's final decision also required the Utility to develop an annual grid needs assessment and an annual distribution deferral opportunity report, to identify proposed electric distribution investments that potentially could be deferred by deployment of DERs. The decision also extends to all DER distribution deferral projects the regulatory incentive mechanism being piloted in the Integrated Distributed Energy Resources Proceeding where the Utility can earn a 4% pre-tax incentive on the annual payments for DER deferral contracts.

On March 26, 2018, the CPUC issued a final decision requiring the Utility to include a grid modernization plan addressing distribution system upgrades required to deploy DERs in the Utility's GRC. The grid modernization plan must include a narrative 10-year vision for investments needed to support DER growth, safety, and reliability, and a status update of previously funded DER-related grid modernization GRC projects. The Utility is required to submit a grid modernization plan with each GRC application starting with its 2020 GRC application.

#### Integrated Distributed Energy Resources Proceeding

On April 4, 2016, the CPUC issued a ruling proposing to establish, on a pilot basis, an interim program offering regulatory incentives to the California IOUs for the deployment of cost-effective DERs. The ruling stated that it did not intend for this phase to adopt a new regulatory framework or business model for the California electric utilities. On December 22, 2016, the CPUC issued a final decision in the proceeding which authorizes a pilot to test a regulatory incentive mechanism through which the Utility will earn a 4% pre-tax incentive on annual payments for DERs, as well as test a regulatory process that will allow the Utility to competitively solicit DER services to defer electric distribution infrastructure. Each IOU is required to conduct at least one pilot, but may conduct up to three additional pilots.

In June 2017, the Utility submitted a pilot project proposal to the CPUC for approval to begin solicitations. The pilot aims to evaluate the effectiveness of an earnings opportunity in motivating utilities to source DERs. In December 2017, the CPUC granted the Utility’s request to cancel the current pilot project proposal due to the damage of the Utility’s facilities in the area of the Northern California wildfires.

On February 12, 2018, the CPUC issued an amended scoping memo and ruling to investigate DER sourcing mechanisms beyond the existing competitive solicitations for DERs. The scope now includes: (1) the design, for CPUC consideration and adoption, of alternative sourcing mechanisms or approaches that satisfy distribution planning objectives; and (2) the consideration of how existing programs, incentives, and tariffs can be coordinated to maximize locational benefits and minimize DER costs. The IOUs and other parties filed opening and reply comments on March 29, 2018, and April 13, 2018, respectively, in response to the CPUC's ruling to further investigate sourcing mechanisms beyond the existing competitive solicitations framework.

### LEGISLATIVE AND REGULATORY INITIATIVES

#### Power Charge Indifference Adjustment OIR

On April 25, 2017, the Utility, along with Southern California Edison Company and San Diego Gas & Electric Company, filed a joint application with the CPUC regarding allocating costs associated with long-term power commitments in a manner that treats all customers equally. At issue is how customers within communities that choose to implement CCA power arrangements and those served under direct access pay for their share of the costs. The utilities believe that these CCA and direct access customers are not paying their full share of costs associated with the long-term commitments, which results in other customers paying more, which is inconsistent with state law. The Utility projects that more than half of its customers will purchase electricity from a CCA or direct access provider by 2020. Without changes to the current cost allocation system, a portion of the contract and facilities costs will be shifted to customers who remain with the Utility or live in areas that do not have access to alternative electricity providers. The utilities’ joint proposed approach would replace the current system, which is known as the PCIA, with an updated system known as the Portfolio Allocation Methodology.

On June 29, 2017, the CPUC dismissed the Utility’s joint Portfolio Allocation Methodology application without prejudice and instead approved an OIR to review, revise, and consider alternatives to the PCIA. The OIR will focus on PCIA within the larger context of consumer choice in energy services. On September 25, 2017, the CPUC issued a scoping memo and ruling establishing a procedural schedule and a new overall goal to mitigate cost increases for both bundled and CCA and direct access customers. On April 2, 2018, the Utility served joint testimony with Southern California Edison and San Diego Gas & Electric to the CPUC along with eight other parties including ORA, TURN, and California Community Choice Association. The Utility, Southern California Edison, and San Diego Gas & Electric served joint rebuttal testimony on April 23, 2018. Evidentiary hearings are scheduled to begin on May 7, 2018, and a proposed decision is expected in the third quarter of 2018.

#### OIR to Consider Strategies and Guidance for Climate Change Adaptation

On April 26, 2018, the CPUC opened an OIR to consider strategies for integrating climate change adaptation considerations into relevant CPUC proceedings. Phase one of the OIR will broadly consider how to integrate climate change adaptation into the investor-owned electric and gas utilities’ existing planning and operations to ensure their safety and reliability.

The CPUC will consider (1) the definition of climate adaptation that should be used for IOUs, (2) resources that should be used to inform CPUC proceedings and utility planning and operations, (3) climate parameters that should be used to determine climate-driven risks and resilience for electric and natural gas utilities, (4) climate scenarios, climate-relevant parameters, and resilience metrics that should be used in electric and gas utility planning and operations, and in CPUC proceedings, to address climate adaptation in a consistent manner, and (5) climate impacts specifically relevant to disadvantaged communities.

According to the OIR, the scope of the proceeding may further include consideration of robust utility-conducted vulnerability assessments, and the scope and breadth of those assessments. Guidance resulting from this OIR will instruct utilities on how to incorporate adaptation in their investment plans, program design, and operations. The scope for future phases of this proceeding will be considered at a later time, but they are anticipated to consider climate adaptation for CPUC-regulated water and telecommunications utilities.

While the preliminary schedule for phase one is subject to change, comments are due in late May 2018, followed by workshops expected in late summer 2018. The CPUC anticipates issuing a proposed decision by late April 2019.

### ENVIRONMENTAL MATTERS

The Utility’s operations are subject to extensive federal, state, and local laws and permits relating to the protection of the environment and the safety and health of the Utility’s personnel and the public. These laws and requirements relate to a broad range of the Utility’s activities, including the remediation of hazardous wastes; the reporting and reduction of carbon dioxide and other GHG emissions; the discharge of pollutants into the air, water, and soil; the reporting of safety and reliability measures for natural gas storage facilities; and the transportation, handling, storage, and disposal of spent nuclear fuel. (See Note 9 of the Notes to the Condensed Consolidated Financial Statements in Item 1 of this Form 10-Q, as well as “Item 1A. Risk Factors” and Note 13 of the Notes to the Consolidated Financial Statements in Item 8 of the 2017 Form 10-K.)

### CONTRACTUAL COMMITMENTS

PG&E Corporation and the Utility enter into contractual commitments in connection with future obligations that relate to purchases of electricity and natural gas for customers, purchases of transportation capacity, purchases of renewable energy, and purchases of fuel and transportation to support the Utility’s generation activities. (See “Purchase Commitments” in Note 9 of the Notes to the Condensed Consolidated Financial Statements in Item 1). Contractual commitments that relate to financing arrangements include long-term debt, preferred stock, and certain forms of regulatory financing. For more in-depth discussion about PG&E Corporation’s and the Utility’s contractual commitments, see “Liquidity and Financial Resources” above and MD&A "Contractual Commitments" in Item 7 of the 2017 Form 10-K.

### Off-Balance Sheet Arrangements

PG&E Corporation and the Utility do not have any off-balance sheet arrangements that have had, or are reasonably likely to have, a current or future material effect on their financial condition, changes in financial condition, revenues or expenses, results of operations, liquidity, capital expenditures, or capital resources, other than those discussed in Note 13 of the Notes to the Consolidated Financial Statements in Item 8 of the 2017 Form 10-K (the Utility’s commodity purchase agreements).

### RISK MANAGEMENT ACTIVITIES

PG&E Corporation, mainly through its ownership of the Utility, and the Utility are exposed to risks associated with adverse changes in commodity prices, interest rates, and counterparty credit.

The Utility actively manages market risk through risk management programs designed to support business objectives, discourage unauthorized risk-taking, reduce commodity cost volatility, and manage cash flows. The Utility uses derivative instruments only for risk mitigation purposes and not for speculative purposes. The Utility’s risk management activities include the use of physical and financial instruments such as forward contracts, futures, swaps, options, and other instruments and agreements, most of which are accounted for as derivative instruments. Some contracts are accounted for as leases. The Utility manages credit risk associated with its counterparties by assigning credit limits based on evaluations of their financial conditions, net worth, credit ratings, and other credit criteria as deemed appropriate. Credit limits and credit quality are monitored periodically. These activities are discussed in detail in the 2017 Form 10-K. There were no significant developments to the Utility’s and PG&E Corporation’s risk management activities during the three months ended March 31, 2018.

### CRITICAL ACCOUNTING POLICIES

The preparation of the Condensed Consolidated Financial Statements in accordance with GAAP involves the use of estimates and assumptions that affect the recorded amounts of assets and liabilities as of the date of the Condensed Consolidated Financial Statements and the reported amounts of revenues and expenses during the reporting period. PG&E Corporation and the Utility consider their accounting policies for regulatory assets and liabilities, loss contingencies associated with environmental remediation liabilities and legal and regulatory matters, AROs, and pension and other post-retirement benefits plans to be critical accounting policies. These policies are considered critical accounting policies due, in part, to their complexity and because their application is relevant and material to the financial position and results of operations of PG&E Corporation and the Utility, and because these policies require the use of material judgments and estimates. Actual results may differ materially from these estimates. These accounting policies and their key characteristics are discussed in detail in the 2017 Form 10-K.

### ACCOUNTING STANDARDS ISSUED BUT NOT YET ADOPTED

See the discussion above in Note 2 of the Notes to the Condensed Consolidated Financial Statements in Item 1.

### FORWARD-LOOKING STATEMENTS

This report contains forward-looking statements that are necessarily subject to various risks and uncertainties. These statements reflect management’s judgment and opinions that are based on current estimates, expectations, and projections about future events and assumptions regarding these events and management's knowledge of facts as of the date of this report. These forward-looking statements relate to, among other matters, estimated losses, including penalties and fines, associated with various investigations and proceedings; forecasts of pipeline-related expenses that the Utility will not recover through rates; forecasts of capital expenditures; estimates and assumptions used in critical accounting policies, including those relating to regulatory assets and liabilities, environmental remediation, litigation, third-party claims, and other liabilities; and the level of future equity or debt issuances. These statements are also identified by words such as “assume,” “expect,” “intend,” “forecast,” “plan,” “project,” “believe,” “estimate,” “predict,” “anticipate,” “may,” “should,” “would,” “could,” “potential” and similar expressions. PG&E Corporation and the Utility are not able to predict all the factors that may affect future results. Some of the factors that could cause future results to differ materially from those expressed or implied by the forward-looking statements, or from historical results, include, but are not limited to:

- the impact of the Northern California wildfires, including whether the Utility will be able to recover costs for service restoration and repair to the Utility's facilities through CEMA ; the timing and outcome of the wildfire investigations, including into the causes of the wildfires; whether the Utility may have liability associated with these fires; if liable for one or more fires, whether the Utility would be able to recover all or part of such costs through insurance or through regulatory mechanisms, to the extent insurance is not available or exhausted; and potential liabilities in connection with fines or penalties that could be imposed on the Utility if the CPUC or any other law enforcement agency brought an enforcement action and determined that the Utility failed to comply with applicable laws and regulations;
- the timing and outcome of the Butte fire litigation, the timing and outcome of any proceeding to recover from customers restoration and repair costs and costs in excess of insurance, if any; the effect, if any, that the SED’s $8.3 million citations issued in connection with the Butte fire may have on the Butte fire litigation; and whether additional investigations and proceedings in connection with the Butte fire will be opened and any additional fines or penalties imposed on the Utility;
- whether the CPUC approves the Utility’s application to establish a WEMA to track wildfire expenses and to preserve the opportunity for the Utility to request recovery of wildfire costs in excess of insurance at a future date, and the outcome of any potential request to recover such costs;
- the impact of the Tax Act, and the timing and outcome of CPUC decision(s) related to the Utility’s March 30, 2018 submissions in connection with the impact of the Tax Act on the Utility’s rate cases and its implementation plan;
- the timing and outcomes of the 2019 GT&S rate case, TO18 and TO19 rate cases, 2018 CEMA, and other ratemaking and regulatory proceedings;
- the cost of the Utility's community wildfire safety program, and the timing and outcome of any proceeding to recover such costs through rates;
- the outcome of the probation and the monitorship imposed by the federal court after the Utility’s conviction in the federal criminal trial in 2017, the timing and outcomes of the debarment proceeding, the SED’s unresolved enforcement matters relating to the Utility’s compliance with natural gas-related laws and regulations, and other investigations that have been or may be commenced relating to the Utility’s compliance with natural gas- and electric- related laws and regulations, ex parte communications, and the ultimate amount of fines, penalties, and remedial costs that the Utility may incur in connection with the outcomes;
- the timing and outcomes of investigations by the U.S. Attorney’s Office in San Francisco and the California Attorney General’s office related to communications between the Utility’s personnel and CPUC officials, whether additional criminal or regulatory investigations or enforcement actions are commenced with respect to allegedly improper communications, and the extent to which such matters negatively affect the final decisions to be issued in the Utility’s ratemaking proceedings;
- the effects on PG&E Corporation and the Utility’s reputations caused by the Utility’s conviction in the federal criminal trial in 2017, the CPUC's investigations of natural gas incidents, and the Northern California wildfires, improper communications between the CPUC and the Utility, and the Utility’s ongoing work to remove encroachments from transmission pipeline rights-of-way;
- whether the Utility can control its costs within the authorized levels of spending, and timely recover its costs through rates; whether the Utility can continue implementing a streamlined organizational structure and achieve project savings, the extent to which the Utility incurs unrecoverable costs that are higher than the forecasts of such costs; and changes in cost forecasts or the scope and timing of planned work resulting from changes in customer demand for electricity and natural gas or other reasons;
- whether the Utility and its third-party vendors and contractors are able to protect the Utility’s operational networks and information technology systems from cyber- and physical attacks, or other internal or external hazards;
- the timing and outcome of the complaint filed by the CPUC and certain other parties with the FERC on February 2, 2017, that requests that the Utility provide an open and transparent planning process for its capital transmission projects that do not go through the CAISO’s Transmission Planning Process to allow for greater participation and input from interested parties; and the timing and ultimate outcome of the Ninth Circuit Court of Appeals decision on January 8, 2018, to reverse FERC’s decision granting PG&E a 50 basis point ROE incentive adder for continued participation in the CAISO and remanding the case to FERC for further proceedings;
- the amount and timing of additional common stock and debt issuances by PG&E Corporation, including the dilutive impact of common stock issuances to fund PG&E Corporation’s equity contributions to the Utility as the Utility incurs charges and costs, including fines, that it cannot recover through rates;
- the outcome of the safety culture OII, including its phase two proceeding opened on May 8, 2017, and future legislative or regulatory actions that may be taken, such as requiring the Utility to separate its electric and natural gas businesses, or restructure into separate entities, or undertake some other corporate restructuring, or implement corporate governance changes;
- the outcome of current and future self-reports, investigations, or other enforcement proceedings that could be commenced or notices of violation that could be issued relating to the Utility’s compliance with laws, rules, regulations, or orders applicable to its operations, including the construction, expansion, or replacement of its electric and gas facilities, electric grid reliability, inspection and maintenance practices, customer billing and privacy, physical and cybersecurity, environmental laws and regulations; and the outcome of existing and future SED notices of violations;
- the impact of comments and CPUC action in connection with the Utility’s SmartMeter™ Upgrade cost-benefit analysis;
- the impact of environmental remediation laws, regulations, and orders; the ultimate amount of costs incurred to discharge the Utility’s known and unknown remediation obligations; and the extent to which the Utility is able to recover environmental costs in rates or from other sources;
- the impact of California Governor Jerry Brown's executive order issued on January 26, 2018, to implement a new target of five million zero-emission vehicles on the road in California by 2030;
- the ultimate amount of unrecoverable environmental costs the Utility incurs associated with the Utility’s natural gas compressor station site located near Hinkley, California and the Utility's fossil fuel-fired generation sites;
- the impact of new legislation or NRC regulations, recommendations, policies, decisions, or orders relating to the nuclear industry, including operations, seismic design, security, safety, relicensing, the storage of spent nuclear fuel, decommissioning, cooling water intake, or other issues; the impact of potential actions, such as legislation, taken by state agencies that may affect the Utility’s ability to continue operating Diablo Canyon until its planned retirement; and whether the Utility will be able to successfully implement its retention and retraining and development programs for Diablo Canyon employees as a result of its planned retirement by 2024 and 2025;
- the impact of wildfires, droughts, floods, or other weather-related conditions or events, climate change, natural disasters, acts of terrorism, war, vandalism (including cyber-attacks), downed power lines, and other events, that can cause unplanned outages, reduce generating output, disrupt the Utility’s service to customers, or damage or disrupt the facilities, operations, or information technology and systems owned by the Utility, its customers, or third parties on which the Utility relies, and the reparation and other costs that the Utility may incur in connection with such conditions or events; the impact of the adequacy of the Utility’s emergency preparedness; whether the Utility incurs liability to third parties for property damage or personal injury caused by such events; whether the Utility is subject to civil, criminal, or regulatory penalties in connection with such events; and whether the Utility’s insurance coverage is available for these types of claims and sufficient to cover the Utility’s liability;
- the outcome of state initiatives and numerous bills introduced by state legislators to address climate resilience and augment disaster planning in response to the wildfires in California, that if passed, could affect the Utility’s cost recovery mechanisms, operational requirements, and resiliency plans for certain catastrophic events;
- the breakdown or failure of equipment that can cause damages, including fires, and unplanned outages; and whether the Utility will be subject to investigations, penalties, and other costs in connection with such events;
- how the CPUC and the California Air Resources Board implement state environmental laws relating to GHG, renewable energy targets, energy efficiency standards, DERs, EVs, and similar matters, including whether the Utility is able to continue recovering associated compliance costs, such as the cost of emission allowances and offsets under cap-and-trade regulations; and whether the Utility is able to timely recover its associated investment costs;
- whether the Utility’s climate change adaptation strategies are successful;
- the impact that reductions in customer demand for electricity and natural gas have on the Utility’s ability to make and recover its investments through rates and earn its authorized return on equity, and whether the Utility is successful in addressing the impact of growing distributed and renewable generation resources, changing customer demand for natural gas and electric services, and an increasing number of customers departing the Utility’s procurement service for CCAs;
- the supply and price of electricity, natural gas, and nuclear fuel; the extent to which the Utility can manage and respond to the volatility of energy commodity prices; the ability of the Utility and its counterparties to post or return collateral in connection with price risk management activities; and whether the Utility is able to recover timely its electric generation and energy commodity costs through rates, including its renewable energy procurement costs;
- whether, as a result of Westinghouse’s Chapter 11 proceeding and its bankruptcy court approved plan of reorganization, the Utility will experience issues with nuclear fuel supply, nuclear fuel inventory, and related services and products that Westinghouse supplies, and whether the implementation of the plan or reorganization will affect the Utility’s contracts with Westinghouse;
- the amount and timing of charges reflecting probable liabilities for third-party claims; the extent to which costs incurred in connection with third-party claims or litigation can be recovered through insurance, rates, or from other third parties; and whether the Utility can continue to obtain adequate insurance coverage for future losses or claims, especially following a major event that causes widespread third-party losses;
- the ability of PG&E Corporation and the Utility to access capital markets and other sources of debt and equity financing in a timely manner on acceptable terms;
- changes in credit ratings which could, among other things, result in higher borrowing costs and fewer financing options, especially if PG&E Corporation or the Utility were to lose their investment grade credit ratings;
- the impact of the regulation of utilities and their holding companies, including how the CPUC interprets and enforces the financial and other conditions imposed on PG&E Corporation when it became the Utility’s holding company, and whether the uncertainty in connection with the Northern California wildfires, the ultimate outcomes of the CPUC’s pending investigations, and other enforcement matters will impact the Utility’s ability to make distributions to PG&E Corporation, and whether they will continue impacting PG&E Corporation's and the Utility's ability to pay dividends;
- the outcome of federal or state tax audits and the impact of any changes in federal or state tax laws, policies, regulations, or their interpretation;
- changes in the regulatory and economic environment, including potential changes affecting renewable energy sources and associated tax credits, as a result of the current federal administration; and
- the impact of changes in GAAP, standards, rules, or policies, including those related to regulatory accounting, and the impact of changes in their interpretation or application.

Additional information about risks and uncertainties, including more detail about the factors described in this report, is included throughout MD&A, in “Item 1A. Risk Factors” below, and in the 2017 Form 10-K, including the “Risk Factors” section. Forward-looking statements speak only as of the date they are made. PG&E Corporation and the Utility do not undertake any obligation to update forward-looking statements, whether in response to new information, future events, or otherwise.

Additionally, PG&E Corporation and the Utility routinely provide links to the Utility’s principal regulatory proceedings before the CPUC and the FERC at *http://investor.pgecorp.com*, under the “Regulatory Filings” tab, so that such filings are available to investors upon filing with the relevant agency. It is possible that these regulatory filings or information included therein could be deemed to be material information. The information contained on this website is not part of this or any other report that PG&E Corporation or the Utility files with, or furnishes to, the SEC. PG&E Corporation and the Utility are providing the address to this website solely for the information of investors and do not intend the address to be an active link. PG&E Corporation and the Utility also routinely post or provide direct links to presentations, documents, and other information that may be of interest to investors at *http://investor.pgecorp.com*, under the “News & Events: Events & Presentations” tab, in order to publicly disseminate such information.

## Market risk

As filed, 654 characters.

PG&E Corporation’s and the Utility’s primary market risk results from changes in energy commodity prices. PG&E Corporation and the Utility engage in price risk management activities for non-trading purposes only. Both PG&E Corporation and the Utility may engage in these price risk management activities using forward contracts, futures, options, and swaps to hedge the impact of market fluctuations on energy commodity prices and interest rates. (See the section above entitled “Risk Management Activities” in MD&A and in Note 7: Derivatives and Note 8: Fair Value Measurements of the Notes to the Condensed Consolidated Financial Statements in Item 1.)

## Controls and procedures

As filed, 1,199 characters.

Based on an evaluation of PG&E Corporation’s and the Utility’s disclosure controls and procedures as of March 31, 2018, PG&E Corporation’s and the Utility’s respective principal executive officers and principal financial officers have concluded that such controls and procedures are effective to ensure that information required to be disclosed by PG&E Corporation and the Utility in reports that the companies file or submit under the Securities Exchange Act of 1934, as amended, is (i) recorded, processed, summarized, and reported within the time periods specified in the SEC rules and forms, and (ii) accumulated and communicated to PG&E Corporation’s and the Utility’s management, including PG&E Corporation’s and the Utility’s respective principal executive officers and principal financial officers, or persons performing similar functions, as appropriate to allow timely decisions regarding required disclosure.

There were no changes in internal control over financial reporting that occurred during the quarter ended March 31, 2018, that have materially affected, or are reasonably likely to materially affect, PG&E Corporation’s or the Utility’s internal control over financial reporting.

## Risk factors

As filed, 3,355 characters.

For information about the significant risks that could affect PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows, see the section of the 2017 Form 10-K entitled “Risk Factors,” as supplemented below, and the section of this quarterly report entitled “Forward-Looking Statements.”

***PG&E Corporation’s and the Utility’s financial results will be affected by their ability to continue accessing the capital markets and by the terms of debt and equity financings.***

PG&E Corporation and the Utility will continue to seek funds in the capital and credit markets to enable the Utility to make capital investments, and to pay fines that may be imposed in the future, as well as legal and regulatory costs. PG&E Corporation’s and the Utility’s ability to access the capital and credit markets and the costs and terms of available financing depend primarily on PG&E Corporation’s and the Utility’s credit ratings and outlook. Their credit ratings and outlook can be affected by many factors, including pending or anticipated litigation, the pending Cal Fire and CPUC investigations and CPUC ratemaking proceedings, substantial legislative or judicial changes to the application of inverse condemnation, and by the December 20, 2017 decision of the Boards of Directors of PG&E Corporation and the Utility to suspend dividends, as well as the perceived impact of all such matters on PG&E Corporation’s and the Utility’s financial condition, whether or not such perception is accurate. During the first quarter of 2018, Fitch Ratings, Standard & Poor’s Global Ratings, and Moody's Investor Services lowered PG&E Corporation's and the Utility’s credit ratings. If PG&E Corporation’s or the Utility’s credit ratings were to be further downgraded, in particular to below investment grade, their ability to access the capital and credit markets would be negatively affected and could result in higher borrowing costs, fewer financing options, including reduced, or lack of, access to the commercial paper market and additional collateral posting requirements, which in turn could affect liquidity and lead to an increased financing need. Other factors can affect the availability and terms of debt and equity financing, including changes in the federal or state regulatory environment affecting energy companies generally or PG&E Corporation and the Utility in particular, the overall health of the energy industry, an increase in interest rates by the Federal Reserve Bank, and general economic and financial market conditions.

The reputations of PG&E Corporation and the Utility continue to suffer from the negative publicity about matters discussed under “Enforcement and Litigation Matters” in Part II, Item 1. Legal Proceedings and Note 9 of the Notes to the Condensed Consolidated Financial Statements in Part I, Item 1. The negative publicity and the uncertainty about the outcomes of these matters may undermine confidence in management’s ability to execute its business strategy and restore a constructive regulatory environment, which could adversely impact PG&E Corporation’s stock price. Further, the market price of PG&E Corporation common stock could decline materially depending on the outcome of these matters. The amount and timing of future share issuances also could affect the stock price.

Filed May 3, 2018.
Source: SEC EDGAR, the filing index for accession 0001004980-18-000005. Last ingested by Listed: Nov 14, 2026, 23:58 ET. No prices; not investment advice.