## Figures reported in this filing

Standardized XBRL line items for the period ended 2019-06-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2019-04-01 to 2019-06-30 | $3.94bn | us-gaap:RevenueFromContractWithCustomerExcludingAssessedTax |
| Revenue | 6 months, 2019-01-01 to 2019-06-30 | $7.95bn | us-gaap:RevenueFromContractWithCustomerExcludingAssessedTax |
| Operating income | 3 months, 2019-04-01 to 2019-06-30 | −$3.64bn | us-gaap:OperatingIncomeLoss |
| Operating income | 6 months, 2019-01-01 to 2019-06-30 | −$3.45bn | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2019-04-01 to 2019-06-30 | $60.0m | us-gaap:InterestExpense |
| Interest expense | 6 months, 2019-01-01 to 2019-06-30 | $163.0m | us-gaap:InterestExpense |
| Income tax | 3 months, 2019-04-01 to 2019-06-30 | −$1.12bn | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 6 months, 2019-01-01 to 2019-06-30 | −$1.20bn | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2019-04-01 to 2019-06-30 | −$2.55bn | us-gaap:ProfitLoss |
| Net income | 6 months, 2019-01-01 to 2019-06-30 | −$2.41bn | us-gaap:ProfitLoss |
| Diluted EPS | 3 months, 2019-04-01 to 2019-06-30 | −$4.83 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 6 months, 2019-01-01 to 2019-06-30 | −$4.58 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2019-04-01 to 2019-06-30 | −$4.83 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 6 months, 2019-01-01 to 2019-06-30 | −$4.58 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2019-04-01 to 2019-06-30 | 529,000,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 6 months, 2019-01-01 to 2019-06-30 | 528,000,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 6 months, 2019-01-01 to 2019-06-30 | $2.76bn | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 6 months, 2019-01-01 to 2019-06-30 | $2.41bn | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Cash and equivalents | at 2019-06-30 | $3.46bn | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2019-06-30 | $11.58bn | us-gaap:AssetsCurrent |
| Total assets | at 2019-06-30 | $84.39bn | us-gaap:Assets |
| Current liabilities | at 2019-06-30 | $5.71bn | us-gaap:LiabilitiesCurrent |
| Current portion of debt | at 2019-06-30 | $0 | us-gaap:LongTermDebtCurrent |
| Short-term borrowings | at 2019-06-30 | $0 | us-gaap:ShortTermBorrowings |
| Shareholders' equity | at 2019-06-30 | $10.34bn | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 159,979 characters.

### OVERVIEW

PG&E Corporation is a holding company whose primary operating subsidiary is Pacific Gas and Electric Company, a public utility serving northern and central California. The Utility generates revenues mainly through the sale and delivery of electricity and natural gas to customers.

The Utility is regulated primarily by the CPUC and the FERC. The CPUC has jurisdiction over the rates, terms, and conditions of service for the Utility’s electricity and natural gas distribution operations, electric generation, and natural gas transportation and storage. The FERC has jurisdiction over the rates and terms and conditions of service governing the Utility’s electric transmission operations and interstate natural gas transportation contracts. The NRC oversees the licensing, construction, operation, and decommissioning of the Utility’s nuclear generation facilities. The Utility is also subject to the jurisdiction of other federal, state, and local governmental agencies.

This is a combined quarterly report of PG&E Corporation and the Utility and should be read in conjunction with each company’s separate Condensed Consolidated Financial Statements and the Notes to the Condensed Consolidated Financial Statements included in this quarterly report. It also should be read in conjunction with the 2018 Form 10-K.

### Chapter 11 Proceedings

On the Petition Date, PG&E Corporation and the Utility filed voluntary petitions for relief under Chapter 11 in the Bankruptcy Court. PG&E Corporation’s and the Utility’s Chapter 11 Cases are being jointly administered under the caption In re: PG&E Corporation and Pacific Gas and Electric Company, Case No. 19-30088 (DM). For additional information regarding the Chapter 11 Cases, refer to the website maintained by Prime Clerk, LLC, PG&E Corporation’s and the Utility’s claims and noticing agent, at http://restructuring.primeclerk.com/pge.

For more information about the Chapter 11 Cases, see “Item 1A. Risk Factors – Risks Related to Chapter 11 Proceedings and Liquidity” and “Item 7. MD&A – Chapter 11 Proceedings” in the 2018 Form 10-K and Notes 2 and 5 of the Notes to the Condensed Consolidated Financial Statements in Item 1 of this Form 10-Q.

### Going Concern

The accompanying Condensed Consolidated Financial Statements to this Form 10-Q have been prepared on a going concern basis, which contemplates the continuity of operations, the realization of assets and the satisfaction of liabilities in the normal course of business. However, PG&E Corporation and the Utility are facing extraordinary challenges relating to a series of catastrophic wildfires that occurred in Northern California in 2017 and 2018. As a result of these challenges, such realization of assets and satisfaction of liabilities are subject to uncertainty. For more information about the 2018 Camp fire and 2017 Northern California wildfires, see Note 10 of the Notes to the Condensed Consolidated Financial Statements and the 2018 Form 10-K.

Management has concluded that uncertainty regarding these matters raises substantial doubt about PG&E Corporation’s and the Utility’s ability to continue as going concerns, and their independent registered public accountants included an explanatory paragraph in their auditors’ reports relating to the consolidated balance sheets of PG&E Corporation and the Utility as of December 31, 2018 and 2017, and the related consolidated statements of income, comprehensive income, equity, and cash flows, for each of the three years in the period ended December 31, 2018, included in the 2018 Form 10-K, which stated certain conditions exist which raise substantial doubt about PG&E Corporation’s and the Utility’s ability to continue as going concerns in relation to the foregoing. The Condensed Consolidated Financial Statements do not include any adjustments that might result from the outcome of these uncertainties. For more information about these matters, see Notes 1 and 2 to the Condensed Consolidated Financial Statements and the 2018 Form 10-K.

### Summary of Changes in Net Income and Earnings per Share

PG&E Corporation’s net loss was $2,553 million and $2,420 million in the three and six months ended June 30, 2019, respectively, compared to net losses of $984 million and $542 million in the same periods in 2018. PG&E Corporation recognized charges of $1.9 billion and $2.0 billion, net of probable insurance recoveries, associated with the 2018 Camp fire and the 2017 Northern California wildfires, respectively, for the three and six months ended June 30, 2019, compared to charges of $2.1 billion, net of probable insurance recoveries, associated with the 2017 Northern California wildfires during the same periods in 2018.

### Key Factors Affecting Financial Results

PG&E Corporation and the Utility believe that their financial condition, results of operations, liquidity, and cash flows may be materially affected by the following factors:

- *The Outcome of the Chapter 11 Cases.* For the duration of the Chapter 11 Cases, PG&E Corporation’s and the Utility’s business is subject to the risks and uncertainties of bankruptcy. For example, the Chapter 11 Cases could adversely affect the Utility’s relationships with suppliers and employees which, in turn, could adversely affect the value of the business and assets of PG&E Corporation and the Utility. PG&E Corporation and the Utility also expect to incur increased legal and other professional costs associated with the Chapter 11 Cases and the reorganization. At this time, it is not possible to predict with certainty the effect of the Chapter 11 Cases on their business or various creditors, or whether or when PG&E Corporation and the Utility will emerge from bankruptcy. PG&E Corporation’s and the Utility’s future financial condition, results of operations, liquidity and cash flows depend upon confirming, and successfully implementing, on a timely basis, a plan of reorganization. Although PG&E Corporation and the Utility have currently retained the exclusive rights to file a plan of reorganization until September 26, 2019 and to solicit acceptances thereof until November 26, 2019, the Ad Hoc Noteholder Committee and the Ad Hoc Subrogation Group have submitted motions to the Bankruptcy Court for the entry of orders terminating these exclusive rights. If these rights are terminated, there could be a material effect on PG&E Corporation’s and the Utility’s ability to achieve confirmation of a plan of reorganization that would enable PG&E Corporation and the Utility to reach their stated goals.
- *The Utility’s Ability to Fund Ongoing Operations and Other Capital Needs.* In connection with the Chapter 11 Cases, PG&E Corporation and the Utility entered into the DIP Credit Agreement, which was approved on a final basis on March 27, 2019. For the duration of the Chapter 11 Cases, PG&E Corporation and the Utility expect that the DIP Credit Agreement, together with cash on hand, cash flow from operations and distributions received from subsidiaries, will be the Utility’s primary source of capital to fund ongoing operations and other capital needs and that they will have limited, if any, access to additional financing. In the event that cash on hand, cash flow from operations, distributions received from subsidiaries, and availability under the DIP Credit Agreement are not sufficient to meet these liquidity needs, PG&E Corporation and the Utility may be required to seek additional financing, and can provide no assurance that additional financing would be available or, if available, offered on acceptable terms. The amount of any such additional financing could be limited by negative covenants in the DIP Credit Agreement, which include restrictions on PG&E Corporation’s and the Utility’s ability to, among other things, incur additional indebtedness and create liens on assets.
- *The Impact of the 2018 Camp Fire and the 2017 Northern California Wildfires.* PG&E Corporation and the Utility face several uncertainties in connection with the 2018 Camp fire and 2017 Northern California wildfires, related to:
- the amount of possible loss related to third-party claims (as of June 30, 2019, the Utility recorded total charges of $18 billion, which reflects the low end of the range of reasonably estimated losses and is subject to change based on additional information), which aggregate possible losses, if the Utility were found liable for certain or all of the costs, expenses and other losses in connection with the 2018 Camp fire and 2017 Northern California wildfires (other than potential punitive damages, fines and penalties or damages related to future claims), could exceed $30 billion; any punitive damages, fines and penalties or damages related to future claims could be material;
- whether, in light of the CPUC July 8, 2019 final decision in the Customer Harm Threshold OIR that excludes companies in Chapter 11 from accessing the Customer Harm Threshold, the Utility will be able to obtain a substantial recovery of costs related to the 2017 Northern California wildfires;
- the impact of investigations, including criminal, regulatory, and SEC investigations;
- the outcome of the 2017 Northern California Wildfires OII, and any fines or penalties that could result therefrom;
- fines or penalties, which could be material, if any regulatory or law enforcement agency were to bring an enforcement action, including a criminal proceeding, and determined that the Utility had failed to comply with applicable laws and regulations;
- the amount of damages in respect of future claims, which could be material;
- the applicability of the doctrine of inverse condemnation in the 2018 Camp fire and 2017 Northern California wildfires litigation, which the Utility intends to continue to challenge during the pendency of its Chapter 11 Case; the applicability of other theories of liability, including negligence, related to the 2018 Camp fire and 2017 Northern California wildfire claims;
- the recoverability of the above-mentioned costs, even if a court decision imposes liability under the doctrine of inverse condemnation;
- the ability of PG&E Corporation and the Utility to finance costs, expenses and other possible losses in respect of claims related to the 2018 Camp fire and the 2017 Northern California wildfires, through securitization mechanisms or otherwise, which potential financings are not addressed by AB 1054 as it only applies to future wildfires;
- the amount and recoverability of enhanced and accelerated inspection costs of the Utility’s electric transmission and distribution assets (the Utility incurred costs of $275 million and $485 million for enhanced and accelerated inspection and repair costs for the three and six months ended June 30, 2019, respectively); and
- the amount and recoverability of clean-up and repair costs (the Utility incurred costs of $989 million for clean-up and repair of the Utility’s facilities through June 30, 2019).

(See Notes 4 and 10 of the Notes to the Condensed Consolidated Financial Statements in Item 1 and Item 1A. Risk Factors in Part II.)

- *The Uncertainties in Connection with Any Future Wildfires, Wildfire Insurance, and AB 1054.* While PG&E Corporation and the Utility cannot predict the occurrence, timing or extent of damages in connection with future wildfires, factors such as environmental conditions (including weather and vegetation conditions) and the efficacy of wildfire risk mitigation initiatives are expected to influence the frequency and severity of future wildfires. Although the financial impact of future wildfires could be mitigated through insurance, the Utility may not be able to obtain sufficient wildfire insurance coverage at a reasonable cost, or at all, and any such coverage may include limitations that could result in substantial uninsured loses depending on the amount and type of damages resulting from covered events. In addition, the policy reforms contemplated by AB 1054 are likely to affect the financial impact of future wildfires on PG&E Corporation and the Utility should any such wildfires occur. The Wildfire Fund would be available to the Utility to pay eligible claims for liabilities arising from future wildfires and would serve as an alternative to traditional insurance products, provided that the Utility satisfies the numerous conditions to the Utility’s participation in the Wildfire Fund set forth in AB 1054.

However, the impact of AB 1054 on PG&E Corporation and the Utility is subject to numerous uncertainties, including the Utility’s eligibility to access relief under the Wildfire Fund (which is dependent on, among other things, PG&E Corporation and the Utility emerging from Chapter 11 by June 30, 2020 and making the initial contribution thereto), the Utility’s ability to demonstrate to the CPUC that wildfire-related costs paid from the Wildfire Fund were just and reasonable, and whether the benefits of participating in the Wildfire Fund ultimately outweigh its substantial costs. The Utility may not be able to finance its required contributions to the Wildfire Fund, which consist of an initial contribution of approximately $4.8 billion and annual contributions of approximately $193 million. Finally, even if the Utility satisfies the eligibility and other requirements set forth in AB 1054, for eligible claims against the Utility arising between July 12, 2019 and the Utility’s emergence from Chapter 11, the availability of the Wildfire Fund to pay such claims will be capped at 40% of the amount of such claims.

- *The Outcome of Other Enforcement, Litigation, and Regulatory Matters*. The Utility’s financial results may continue to be impacted by the outcome of other current and future enforcement, litigation (to the extent not stayed as a result of the Chapter 11 Cases), and regulatory matters, including those described above as well as the outcome of the Locate and Mark OII, the outcome of the Safety Culture OII, the outcome of phase two of the ex parte OII, the sentencing terms of the Utility’s January 27, 2017 federal criminal conviction, including the oversight of the Utility’s probation and the potential recommendations by the Monitor, and potential penalties in connection with the Utility’s safety and other self-reports. (See Note 11 of the Notes to the Condensed Consolidated Financial Statements in Item 1.)
- *The Timing and Outcome of Ratemaking Proceedings*. The Utility’s financial results may be impacted by the timing and outcome of its 2019 GT&S rate case, 2020 GRC, FERC TO18, TO19, and TO20 rate cases, 2020 cost of capital proceeding, and its ability to timely recover costs not currently in rates, including costs already incurred and future costs tracked in its CEMA, WEMA, FHPMA, WPMA, and FRMMA that are incurred in connection with the Utility's 2019 Wildfire Safety Plan, the amount of which is substantial and is expected to increase. The outcome of regulatory proceedings can be affected by many factors, including intervening parties’ testimonies, potential rate impacts, the Utility’s reputation, the regulatory and political environments, and other factors. (See Notes 4 and 11 of the Notes to the Condensed Consolidated Financial Statements in Item 1 and “Regulatory Matters” below.)
- *The Utility’s Compliance with the CPUC Capital Structure*. The CPUC’s capital structure decisions require the Utility to maintain a 52% equity ratio on average over the period that the authorized capital structure is in place, and to file an application for a waiver to the capital structure condition if an adverse financial event reduces its equity ratio by 1% or more. Due to the net charges recorded in connection with the 2018 Camp fire and the 2017 Northern California wildfires as of December 31, 2018, the Utility submitted to the CPUC an application for a waiver of the capital structure condition on February 28, 2019. The waiver is subject to CPUC approval. The CPUC’s decisions state that the Utility shall not be considered in violation of these conditions during the period the waiver application is pending resolution. The Utility is unable to predict the timing and outcome of its waiver application. (See “Regulatory Matters” below.)

For more information about the factors and risks that could affect PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows, or that could cause future results to differ from historical results, see “Item 1A. Risk Factors” in this Form 10-Q and the 2018 Form 10-K. In addition, this quarterly report contains forward-looking statements that are necessarily subject to various risks and uncertainties. These statements reflect management’s judgment and opinions that are based on current estimates, expectations, and projections about future events and assumptions regarding these events and management’s knowledge of facts as of the date of this report. See the section entitled “Forward-Looking Statements” below for a list of some of the factors that may cause actual results to differ materially. PG&E Corporation and the Utility are not able to predict all the factors that may affect future results and do not undertake an obligation to update forward-looking statements, whether in response to new information, future events, or otherwise.

### RESULTS OF OPERATIONS

### PG&E Corporation

The consolidated results of operations consist primarily of results related to the Utility, which are discussed in the “Utility” section below. The following table provides a summary of net income (loss) for the three and six months ended June 30, 2019 and 2018:

*(in millions)*

|  | Three Months Ended June 30, 2019 | 2018 | Six Months Ended June 30, 2019 | 2018 |
| --- | ---: | ---: | ---: | ---: |
| Consolidated Total | $(2,553) | $(984) | $(2,420) | $(542) |
| PG&E Corporation | 1 | (4) | 4 | (11) |
| Utility | $(2,554) | $(980) | $(2,424) | $(531) |

PG&E Corporation’s net income (loss) primarily consists of income taxes, interest income on cash held, and interest expense on long-term debt.

### Utility

The table below shows certain items from the Utility’s Condensed Consolidated Statements of Income for the three and six months ended June 30, 2019 and 2018. The table separately identifies the revenues and costs that impacted earnings from those that did not impact earnings. In general, expenses the Utility is authorized to pass through directly to customers (such as costs to purchase electricity and natural gas, as well as costs to fund public purpose programs), and the corresponding amount of revenues collected to recover those pass-through costs, do not impact earnings. In addition, expenses that have been specifically authorized (such as the payment of pension costs) and the corresponding revenues the Utility is authorized to collect to recover such costs do not impact earnings.

Revenues that impact earnings are primarily those that have been authorized by the CPUC and the FERC to recover the Utility’s costs to own and operate its assets and to provide the Utility an opportunity to earn its authorized rate of return on rate base. Expenses that impact earnings are primarily those that the Utility incurs to own and operate its assets.

*(in millions)*

|  | Three Months Ended June 30, 2019 Revenues/Costs: That Impacted Earnings | That Did Not Impact Earnings | Total Utility | Three Months Ended June 30, 2018 Revenues/Costs: That Impacted Earnings | That Did Not Impact Earnings | Total Utility |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Electric operating revenues | $1,872 | $1,074 | $2,946 | $1,979 | $1,333 | $3,312 |
| Natural gas operating revenues | 792 | 205 | 997 | 752 | 170 | 922 |
| **Total operating revenues** | **2,664** | **1,279** | **3,943** | **2,731** | **1,503** | **4,234** |
| Cost of electricity | — | 837 | 837 | — | 963 | 963 |
| Cost of natural gas | — | 108 | 108 | — | 79 | 79 |
| Operating and maintenance | 1,562 | 378 | 1,940 | 1,244 | 542 | 1,786 |
| Wildfire-related claims, net of insurance recoveries | 3,900 | — | 3,900 | 2,125 | — | 2,125 |
| Depreciation, amortization, and decommissioning | 796 | — | 796 | 746 | — | 746 |
| **Total operating expenses** | **6,258** | **1,323** | **7,581** | **4,115** | **1,584** | **5,699** |
| **Operating loss** | **(3,594)** | **(44)** | **(3,638)** | **(1,384)** | **(81)** | **(1,465)** |
| Interest income | 22 | — | 22 | 11 | — | 11 |
| Interest expense | (60) | — | (60) | (222) | — | (222) |
| Other income, net | 20 | 44 | 64 | 27 | 81 | 108 |
| Reorganization items | (57) | — | (57) | — | — | — |
| Loss before income taxes | $(3,669) | $— | $(3,669) | $(1,568) | $— | $(1,568) |
| Income tax benefit (1) |  |  | (1,119) |  |  | (592) |
| Net loss |  |  | (2,550) |  |  | (976) |
| Preferred stock dividend requirement |  |  | 4 |  |  | 4 |
| **Loss Attributable to Common Stock** |  |  | **$(2,554)** |  |  | **$(980)** |

(1) This item impacted earnings for the three months ended June 30, 2019 and 2018.

*(in millions)*

|  | Six Months Ended June 30, 2019 Revenues/Costs: That Impacted Earnings | That Did Not Impact Earnings | Total Utility | Six Months Ended June 30, 2018 Revenues/Costs: That Impacted Earnings | That Did Not Impact Earnings | Total Utility |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Electric operating revenues | $3,786 | $1,952 | $5,738 | $3,915 | $2,348 | $6,263 |
| Natural gas operating revenues | 1,586 | 630 | 2,216 | 1,490 | 537 | 2,027 |
| **Total operating revenues** | **5,372** | **2,582** | **7,954** | **5,405** | **2,885** | **8,290** |
| Cost of electricity | — | 1,436 | 1,436 | — | 1,782 | 1,782 |
| Cost of natural gas | — | 447 | 447 | — | 368 | 368 |
| Operating and maintenance | 3,256 | 788 | 4,044 | 2,494 | 896 | 3,390 |
| Wildfire-related claims, net of insurance recoveries | 3,900 | — | 3,900 | 2,118 | — | 2,118 |
| Depreciation, amortization, and decommissioning | 1,593 | — | 1,593 | 1,498 | — | 1,498 |
| **Total operating expenses** | **8,749** | **2,671** | **11,420** | **6,110** | **3,046** | **9,156** |
| **Operating loss** | **(3,377)** | **(89)** | **(3,466)** | **(705)** | **(161)** | **(866)** |
| Interest income | 43 | — | 43 | 20 | — | 20 |
| Interest expense | (161) | — | (161) | (439) | — | (439) |
| Other income, net | 41 | 89 | 130 | 56 | 161 | 217 |
| Reorganization items | (168) | — | (168) | — | — | — |
| Loss before income taxes | $(3,622) | $— | $(3,622) | $(1,068) | $— | $(1,068) |
| Income tax benefit (1) |  |  | (1,205) |  |  | (544) |
| Net loss |  |  | (2,417) |  |  | (524) |
| Preferred stock dividend requirement |  |  | 7 |  |  | 7 |
| **Loss Attributable to Common Stock** |  |  | **$(2,424)** |  |  | **$(531)** |

(1) This item impacted earnings for the six months ended June 30, 2019 and 2018.

### Utility Revenues and Costs that Impacted Earnings

The following discussion presents the Utility’s operating results for the three and six months ended June 30, 2019 and 2018, focusing on revenues and expenses that impacted earnings for these periods.

### Operating Revenues

The Utility’s electric and natural gas operating revenues that impacted earnings decreased by $67 million, or 2%, and $33 million, or 1% in the three and six months ended June 30, 2019, respectively, compared to the same periods in 2018, primarily due to the regulatory treatment of interest on pre-petition debt and other impacts of the Chapter 11 Cases.

### Operating and Maintenance

The Utility’s operating and maintenance expenses that impacted earnings increased by $318 million, or 26%, in the three months ended June 30, 2019, compared to the same period in 2018, primarily due to $275 million related to enhanced and accelerated inspections and repairs of transmission and distribution assets and $71 million for clean-up and repair costs relating to the 2018 Camp fire, with no similar charges in the same period in 2018.

The Utility’s operating and maintenance expenses that impacted earnings increased by $762 million, or 31%, in the six months ended June 30, 2019, compared to the same period in 2018, primarily due to $485 million related to enhanced and accelerated inspections and repairs of transmission and distribution assets and $250 million for clean-up and repair costs relating to the 2018 Camp fire, with no similar charges in the same period in 2018. Additionally, the Utility recorded $40 million in clean-up and repair costs relating to the 2017 Northern California wildfires in the six months ended June 30, 2018, with no similar charges in the same period in 2019.

### Wildfire-related claims, net of insurance recoveries

Costs related to wildfires that impacted earnings increased by $1,775 million, or 84%, and $1,782 million, or 84%, in the three and six months ended June 30, 2019, respectively, compared to the same periods in 2018. The Utility recognized pre-tax charges of $1.9 billion and $2.0 billion associated with the 2018 Camp fire and 2017 Northern California wildfires, respectively, for the three and six months ended June 30, 2019, as compared to pre-tax charges of $2.5 billion, offset by probable insurance recoveries of $375 million, associated with the 2017 Northern California wildfires during the same periods in 2018.

(See “Item 1A. Risk Factors” in the 2018 Form 10-K and Note 10 of the Notes to the Condensed Consolidated Financial Statements in Item 1 of this Form 10-Q.)

### Depreciation, Amortization, and Decommissioning

The Utility’s depreciation, amortization, and decommissioning expenses that impacted earnings increased by $50 million, or 7%, and $95 million, or 6%, in the three and six months ended June 30, 2019, respectively, compared to the same periods in 2018, primarily due to capital additions.

### Interest Income

There was no material change to interest income that impacted earnings for the periods presented.

### Interest Expense

Interest expense that impacted earnings decreased by $162 million, or 73%, and $278 million, or 63% in the three and six months ended June 30, 2019, respectively, compared to the same periods in 2018, primarily due to the cessation of interest accruals on outstanding pre-petition debt beginning January 29, 2019 in connection with the Chapter 11 Cases.

### Other Income, Net

There were no material changes to other income, net, that impacted earnings for the periods presented.

### Reorganization items, net

Reorganization items, net increased by $57 million and $168 million in the three and six months ended June 30, 2019, respectively, compared to the same periods in 2018, due to $75 million and $195 million, respectively, of expenses directly associated with the Utility’s Chapter 11 filing in the three and six months ended June 30, 2019, partially offset by interest income of $18 million and $27 million, respectively.

(See “Item 1A. Risk Factors” in the 2018 Form 10-K and Note 2 of the Notes to the Condensed Consolidated Financial Statements in Item 1 of this Form 10-Q.)

### Income Tax Provision

Income tax benefits increased by $527 million and $661 million in the three and six months ended June 30, 2019, respectively, as compared to the same periods in 2018. The increases in income tax benefits were primarily the result of higher pretax losses in the three and six months ended June 30, 2019, compared to the same period in 2018.

The following table reconciles the income tax expense at the federal statutory rate to the income tax provision:

|  | Three Months Ended June 30, 2019 | 2018 | Six Months Ended June 30, 2019 | 2018 |
| --- | ---: | ---: | ---: | ---: |
| Federal statutory income tax rate | 21.0% | 21.0% | 21.0% | 21.0% |
| Increase (decrease) in income tax rate resulting from: |  |  |  |  |
| State income tax (net of federal benefit) (1) | 7.4% | 8.6% | 7.7% | 11.5% |
| Effect of regulatory treatment of fixed asset differences (2) | 2.3% | 6.2% | 4.6% | 16.8% |
| Tax credits | 0.1% | 0.2% | 0.2% | 0.6% |
| Other, net | (0.3)% | 1.9% | (0.2)% | 1.1% |
| **Effective tax rate** | **30.5%** | **37.9%** | **33.3%** | **51.0%** |

(1) Includes the effect of state flow-through ratemaking treatment.

(2) Includes the effect of federal flow-through ratemaking treatment for certain property-related costs as authorized by various CPUC decisions. All amounts are impacted by the level of income before income taxes. The various CPUC rate case decisions authorized revenue requirements that reflect flow-through ratemaking for temporary income tax differences attributable to repair costs and certain other property-related costs for federal tax purposes. For these temporary tax differences, PG&E Corporation and the Utility recognize the deferred tax impact in the current period and record offsetting regulatory assets and liabilities. Therefore, PG&E Corporation’s and the Utility’s effective tax rates are impacted as these differences arise and reverse. PG&E Corporation and the Utility recognize such differences as regulatory assets or liabilities as it is probable that these amounts will be recovered from or returned to customers in future rates. In 2018 and 2019, the amounts also reflect the impact of the amortization of excess deferred tax benefits to be refunded to customers as a result of the Tax Act passed in December 2017.

### Utility Revenues and Costs that did not Impact Earnings

Fluctuations in revenues that did not impact earnings are primarily driven by electricity and natural gas procurement costs. See below for more information.

### Cost of Electricity

The Utility’s cost of electricity includes the cost of power purchased from third parties (including renewable energy resources), transmission, fuel used in its own generation facilities, fuel supplied to other facilities under power purchase agreements, costs to comply with California’s cap-and-trade program, and realized gains and losses on price risk management activities. The costs also include net sales (Utility owned generation and third parties) in the CAISO electricity markets. (See Note 8 of the Notes to the Condensed Consolidated Financial Statements in Item 1.) The Utility’s total purchased power is driven by customer demand, net CAISO electricity market activities (purchases or sales), the availability of the Utility’s own generation facilities (including Diablo Canyon and its hydroelectric plants), and the cost-effectiveness of each source of electricity.

*(in millions)*

|  | Three Months Ended June 30, 2019 | 2018 | Six Months Ended June 30, 2019 | 2018 |
| --- | ---: | ---: | ---: | ---: |
| Cost of purchased power, net (1) | $796 | $919 | $1,295 | $1,672 |
| Fuel used in generation facilities | 41 | 44 | 141 | 110 |
| **Total cost of electricity** | **$837** | **$963** | **$1,436** | **$1,782** |

(1) Cost of purchased power, net decreased for the three and six months ended June 30, 2019, compared to the same periods in 2018, primarily due to lower Utility electric customer demand, driven by customer departures to CCAs and DA providers, and by higher net sales in the CAISO electricity markets.

### Cost of Natural Gas

The Utility’s cost of natural gas includes the costs of procurement, storage and transportation of natural gas, costs to comply with California’s cap-and-trade program, and realized gains and losses on price risk management activities. (See Note 8 of the Notes to the Condensed Consolidated Financial Statements in Item 1.) The Utility’s cost of natural gas is impacted by the market price of natural gas, changes in the cost of storage and transportation, and changes in customer demand.

*(in millions)*

|  | Three Months Ended June 30, 2019 | 2018 | Six Months Ended June 30, 2019 | 2018 |
| --- | ---: | ---: | ---: | ---: |
| Cost of natural gas sold | $82 | $53 | $391 | $310 |
| Transportation cost of natural gas sold | 26 | 26 | 56 | 58 |
| **Total cost of natural gas** | **$108** | **$79** | **$447** | **$368** |

(1) One thousand cubic feet

### Operating and Maintenance Expenses

The Utility’s operating expenses that did not impact earnings include certain costs that the Utility is authorized to recover as incurred such as pension contributions and public purpose programs costs. If the Utility were to spend more than authorized amounts, these expenses could have an impact to earnings.

### Other Income, Net

The Utility’s other income, net that did not impact earnings includes pension and other post-retirement benefit costs that fluctuate primarily from market and interest rate changes.

### LIQUIDITY AND FINANCIAL RESOURCES

### Overview

On the Petition Date, PG&E Corporation and the Utility filed voluntary petitions for relief under Chapter 11 in the Bankruptcy Court. In connection with the Chapter 11 Cases, PG&E Corporation and the Utility entered into the DIP Credit Agreement. The DIP Credit Agreement provides for $5.5 billion in senior secured superpriority debtor in possession credit facilities in the form of (i) a revolving credit facility in an aggregate amount of $3.5 billion (the “DIP Revolving Facility”), including a $1.5 billion letter of credit subfacility, (ii) a term loan facility in an aggregate principal amount of $1.5 billion (the “DIP Initial Term Loan Facility”) and (iii) a delayed draw term loan facility in an aggregate principal amount of $500 million (the “DIP Delayed Draw Term Loan Facility,” together with the DIP Revolving Facility and the DIP Initial Term Loan Facility, the “DIP Facilities”), subject to the terms and conditions set forth therein. On March 27, 2019, the Bankruptcy Court approved the DIP Facilities on a final basis, authorizing the Utility to borrow up to the full amount of the DIP Revolving Facility (including the full amount of the $1.5 billion letter of credit subfacility), the DIP Initial Term Loan Facility and the DIP Delayed Draw Term Loan Facility, in each case subject to the terms and conditions of the DIP Credit Agreement. (For more information on the DIP Credit Agreement, see “DIP Credit Agreement” below and Note 5 of the Notes to the Consolidated Financial Statements in Item 1.)

For the duration of the Chapter 11 Cases, the Utility’s ability to fund operations, finance capital expenditures and pay other ongoing expenses and make distributions to PG&E Corporation will primarily depend on the levels of its operating cash flows and availability under the DIP Credit Agreement. The Utility expects that the DIP Facilities will provide it with sufficient liquidity to fund its ongoing operations, including its ability to provide safe service to customers, during the Chapter 11 Cases. For the duration of the Chapter 11 Cases, PG&E Corporation’s ability to fund operations and pay other ongoing expenses will primarily depend on cash on hand and intercompany transfers. In the event that PG&E Corporation’s and the Utility’s capital needs increase materially due to unexpected events or transactions, additional financing outside of the DIP Facilities may be required, which would be subject to approval by the Bankruptcy Court. Such approval is not assured. For more information on PG&E Corporation’s and the Utility’s material commitments for capital expenditures, see “Regulatory Matters” below.

During 2018 and January 2019, PG&E Corporation’s and the Utility’s credit ratings were subject to multiple downgrades by Fitch, S&P and Moody’s including to ratings below investment grade and ultimately to “D” or low “C” ratings. In the first quarter of 2019, Moody’s and Fitch withdrew each of their credit ratings for PG&E Corporation and the Utility as a result of the Chapter 11 Cases. As a result of PG&E Corporation’s and the Utility’s credit ratings ceasing to be rated at investment grade, the Utility has been required to post additional collateral under its commodity purchase agreements and certain other obligations, and has been exposed to significant constraints on its customary trade credit. In addition, PG&E Corporation and the Utility may be required to post additional collateral in respect of certain other obligations, including workers’ compensation and environmental remediation obligations. (See Notes 8 and 11 of the Notes to the Consolidated Financial Statements in Item 1.)

### Cash and Cash Equivalents

Cash and cash equivalents consist of cash and short-term, highly liquid investments with original maturities of three months or less. PG&E Corporation and the Utility maintain separate bank accounts and primarily invest their cash in money market funds.

### Financial Resources

### Acceleration of Pre-Petition Debt Obligations

The commencement of the Chapter 11 Cases constituted an event of default or termination event with respect to, and caused an automatic and immediate acceleration of, the Accelerated Direct Financial Obligations. Accordingly, as a result of the commencement of the Chapter 11 Cases, the principal amount of the Accelerated Direct Financial Obligations, together with accrued interest thereon, and in case of certain indebtedness, premium, if any, thereon, immediately became due and payable. However, any efforts to enforce such payment obligations are automatically stayed as of the Petition Date, and are subject to the applicable provisions of the Bankruptcy Code and orders of the Bankruptcy Court. The material Accelerated Direct Financial Obligations include the Utility’s outstanding senior notes, agreements in respect of certain series of pollution control bonds, and PG&E Corporation’s term loan facility, as well as short-term borrowings under PG&E Corporation’s and the Utility’s revolving credit facilities and the Utility’s term loan facility disclosed in Note 5 of the Notes to the Condensed Consolidated Financial Statements in Item 1.

### DIP Credit Agreement

On February 1, 2019, the Utility borrowed $350 million under the DIP Revolving Facility. On April 3, 2019, the Utility borrowed $1.5 billion under the DIP Initial Term Loan Facility and received the proceeds of such borrowing, net of original issue discount and repayment of the $350 million in outstanding borrowings under the DIP Revolving Facility. The DIP Initial Term Loan Facility matures on December 31, 2020 (subject to an extension option described further below) and bears interest at a spread of 225 basis points over LIBOR.

Borrowings under the DIP Facilities are senior secured obligations of the Utility, secured by substantially all of the Utility’s assets and entitled to superpriority administrative expense claim status in the Utility’s Chapter 11 Case. The Utility’s obligations under the DIP Facilities are guaranteed by PG&E Corporation, and such guarantee is a senior secured obligation of PG&E Corporation, secured by substantially all of PG&E Corporation’s assets and entitled to superpriority administrative expense claim status in PG&E Corporation’s Chapter 11 Case. The DIP Facilities will mature on December 31, 2020, subject to the Utility’s option to extend the maturity to December 31, 2021 if certain terms and conditions are satisfied, including the payment of an extension fee. The Utility paid customary fees and expenses in connection with obtaining the DIP Facilities.

As of August 7, 2019, the Utility had outstanding borrowings of $1.5 billion under the DIP Initial Term Loan Facility, no outstanding borrowings under the DIP Delayed Draw Term Loan Facility or the DIP Revolving Facility and $537 million in face amount of letters of credit outstanding under the DIP Revolving Facility. As of August 7, 2019, there were undrawn commitments of $500 million and $3.0 billion on the DIP Delayed Draw Term Loan Facility and the DIP Revolving Facility, respectively. Pursuant to the terms of the DIP Credit Agreement, until such time as the DIP Delayed Draw Term Loan Facility has been drawn in full, or the commitments in respect thereof have terminated or expired, further borrowings under the DIP Revolving Facility are not permitted.

### CPUC Authorization of DIP Credit Agreement

On January 28, 2019, the CPUC granted the Utility exemptions from the requirement of prior CPUC approval for issuance of debt instruments for the incurrence of the DIP financing. The CPUC also indicated its position that the exemptions do not extend to the transfer of ownership of any Utility asset that is pledged as part of the DIP financing and that in the event of the Utility’s default under the DIP financing, the Utility would need to seek the CPUC’s approval to execute such a transfer. Further, the CPUC indicated that the Utility’s “expenditure of the initial DIP financing funds for any purposes may not be recovered from ratepayers without Commission approval in a future application for rate recovery” and that the Utility “bears the burden of demonstrating the reasonableness of any expenditure.”

### Equity Financings

There were no issuances under the PG&E Corporation February 2017 equity distribution agreement for the six months ended June 30, 2019.

During the six months ended June 30, 2019, PG&E Corporation issued 8.3 million shares for cash proceeds of $85.2 million under the PG&E Corporation 401(k) plan. The proceeds from these sales were used for general corporate purposes. Beginning January 1, 2019, PG&E Corporation’s matching contributions under its 401(k) plan are deposited in cash. Beginning in March 2019, at PG&E Corporation’s directive, the 401(k) plan trustee began purchasing new shares in the PCG common stock fund on the open market rather than from PG&E Corporation.

PG&E Corporation does not expect to issue equity for the remaining duration of the Chapter 11 Cases.

### Dividends

On December 20, 2017, the Boards of Directors of PG&E Corporation and the Utility suspended quarterly cash dividends on both PG&E Corporation’s and the Utility’s common stock, beginning the fourth quarter of 2017, as well as the Utility’s preferred stock, beginning the three-month period ending January 31, 2018, due to the uncertainty related to the causes of and potential liabilities associated with the 2018 Camp fire and the 2017 Northern California wildfires. PG&E Corporation does not expect to pay any cash dividends during the Chapter 11 Cases. (See Note 10 of the Notes to the Condensed Consolidated Financial Statements in Item 1.) Also, on April 3, 2019, the court overseeing the Utility’s probation issued an order imposing new conditions of probation, including foregoing issuing “any dividends until \[the Utility\] is in compliance with all applicable vegetation management requirements” under applicable law and the Utility’s wildfire mitigation plan. (See “U.S. District Court Matters and Probation” in Item 1. Legal Proceedings and Item 7. MD&A.)

### Utility Cash Flows

The Utility’s cash flows were as follows:

*(in millions)*

|  | Six Months Ended June 30, 2019 | 2018 |
| --- | ---: | ---: |
| Net cash provided by operating activities | $2,776 | $2,722 |
| Net cash used in investing activities | (2,434) | (2,895) |
| Net cash provided by financing activities | 1,399 | 210 |
| **Net change in cash, cash equivalents and restricted cash** | **$1,741** | **$37** |

### Operating Activities

The Utility’s cash flows from operating activities primarily consist of receipts from customers less payments of operating expenses, other than expenses such as depreciation that do not require the use of cash. During the six months ended June 30, 2019, net cash provided by operating activities increased by $54 million compared to the same period in 2018. This increase was due to a reduction in interest paid of $368 million, offset by an increase in amounts paid for reorganization items, and enhanced and accelerated inspections and repairs of transmission and distribution assets in 2019, with no similar payments in 2018.

The Utility will continue to operate its business as a debtor in possession under the jurisdiction of the Bankruptcy Court and in accordance with applicable provisions of the Bankruptcy Code and the orders of the Bankruptcy Court. Future cash flow from operating activities will be affected by various ongoing activities, including:

- the timing and amounts of costs, including fines and penalties, that may be incurred in connection with current and future enforcement, litigation, and regulatory matters (see “Enforcement and Litigation Matters” in Note 11 of the Notes to the Condensed Consolidated Financial Statements in Item 1 and Part II, Item 1. Legal Proceedings for more information);
- the timing and amount of premium payments related to wildfire insurance (see “Wildfire Insurance” in Note 11 of the Notes to the Condensed Consolidated Financial Statements in Item 1 for more information);
- the Tax Act, which may accelerate the timing of federal tax payments and reduce revenue requirements, resulting in lower operating cash flows depending on the timing of wildfire payments;
- the timing and outcomes of the 2019 GT&S rate case, 2020 GRC, FERC TO18, TO19 and TO20 rate cases, 2018 CEMA filing, 2020 Cost of Capital, NDCTP, and other ratemaking and regulatory proceedings; and
- the timing and amount of substantially increasing costs in connection with the 2019 Wildfire Safety Plan (see “Regulatory Matters” below for more information).

The Utility had material obligations outstanding as of the Petition Date, including claims related to the 2018 Camp fire and 2017 Northern California wildfires. Any efforts to enforce such payment obligations are automatically stayed as of the Petition Date, and are subject to the applicable provisions of the Bankruptcy Code and orders of the Bankruptcy Court. Future cash flows will be materially impacted by the timing and outcome of the Chapter 11 Cases.

### Investing Activities

Net cash used in investing activities decreased by $461 million during the six months ended June 30, 2019 as compared to the same period in 2018. The Utility’s investing activities primarily consist of the construction of new and replacement facilities necessary to provide safe and reliable electricity and natural gas services to its customers. Cash used in investing activities also includes the proceeds from sales of nuclear decommissioning trust investments which are largely offset by the amount of cash used to purchase new nuclear decommissioning trust investments. The funds in the decommissioning trusts, along with accumulated earnings, are used exclusively for decommissioning and dismantling the Utility’s nuclear generation facilities.

The Utility’s capital expenditures were approximately $6.5 billion in 2018. Future cash flows used in investing activities are largely dependent on the timing and amount of capital expenditures. The Utility estimates that it will incur approximately $7.1 billion in capital expenditures in 2019, and $7 billion in 2020.

### Financing Activities

Net cash provided by financing activities increased by $1.2 billion during the six months ended June 30, 2019 as compared to the same period in 2018. This increase was primarily due to $1.5 billion of borrowings under the DIP Initial Term Loan Facility in 2019.

Cash provided by or used in financing activities is driven by the Utility’s financing needs, which depend on the level of cash provided by or used in operating activities, the level of cash provided by or used in investing activities, the conditions in the capital markets, and the maturity date of existing debt instruments.

### ENFORCEMENT AND LITIGATION MATTERS

PG&E Corporation and the Utility have significant contingencies arising from their operations, including contingencies related to the enforcement and litigation matters described in Notes 10 and 11 of the Notes to the Condensed Consolidated Financial Statements in Item 1. The outcome of these matters, individually or in the aggregate, could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, and cash flows. In addition, PG&E Corporation and the Utility are involved in other enforcement and litigation matters described in the 2018 Form 10-K and “Part II. Other Information, Item 1. Legal Proceedings.”

### REGULATORY MATTERS

The Utility is subject to substantial regulation by the CPUC, the FERC, the NRC and other federal and state regulatory agencies. The resolutions of the proceedings described below and other proceedings may affect PG&E Corporation’s and the Utility’s financial condition, results of operations, and cash flows. Discussed below are significant regulatory developments that have occurred since filing the 2018 Form 10-K.

### Application for a Waiver of the Capital Structure Condition

The CPUC’s capital structure decisions require the Utility to maintain a 52% equity ratio on average over the period that the authorized capital structure is in place, and to file an application for a waiver to the capital structure condition if an adverse financial event reduces its equity ratio by 1% or more. The CPUC’s decisions state that the Utility shall not be considered in violation of these conditions during the period the waiver application is pending resolution. Due to the net charges recorded in connection with the 2018 Camp fire and the 2017 Northern California wildfires as of December 31, 2018, the Utility submitted to the CPUC an application for a waiver of the capital structure condition on February 28, 2019. The waiver is subject to CPUC approval. On April 30, 2019, the CPUC held a prehearing conference, and on May 29, 2019, the CPUC issued a scoping memo and ruling on issues for briefing. On July 15, 2019, the ALJ approved briefing dates in August and September of 2019. No evidentiary hearings are scheduled. The Utility is unable to predict the timing and outcome of its waiver application.

### 2020 Cost of Capital Proceeding

On April 22, 2019, the Utility filed an application with the CPUC, requesting that the CPUC authorize the Utility's capital structure and rates of return for its electric generation, electric and natural gas distribution, and natural gas transmission and storage rate base beginning on January 1, 2020. In its application, the Utility requested that the CPUC approve the Utility’s proposed capital structure (i.e., the relative weightings of common equity, preferred equity, and debt), as well as the proposed return on equity, proposed cost of preferred stock, and proposed cost of debt. The Utility requested a 16% rate of return on equity for 2020, which reflected, among other things, the wildfire-related challenges that the Utility was facing. The Utility also proposed to amend its cost of capital application with an updated cost of capital if the CPUC or the California legislature implemented actions to materially reduce the challenges that investor-owned utilities face in California in connection with the extreme wildfire risk.

AB 1054, enacted on July 12, 2019, provides for the establishment of the Wildfire Fund that will be available for eligible electric utility companies to pay eligible claims for liabilities arising from wildfires occurring after July 12, 2019 that are caused by the applicable electric utility company’s equipment, subject to the terms and conditions of AB 1054. On July 23, 2019, the Utility notified the CPUC of its election to participate in the Wildfire Fund. The Utility’s participation in the Wildfire Fund is subject to the conditions and limitations set forth in AB 1054 and approval by the Bankruptcy Court.

As a result of the expected effects of AB 1054 on the Utility’s wildfire-related risk profile, on August 1, 2019, in a supplemental cost of capital testimony, the Utility proposed to revise its rate of return on equity to 12%.

The following table compares the revenue requirement amounts currently authorized in the Utility’s 2015 GT&S rate case and the 2017 GRC, with those requested in the Utility’s 2020 cost of capital application, as updated by the Utility’s August 1, 2019 testimony to reflect a revised rate of return on equity:

|  | 2019 Currently Authorized Cost | Capital Structure | Weighted Cost | 2020 Requested (as revised) Cost | Capital Structure | Weighted Cost |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Return on common equity | 10.25% | 52.00% | 5.33% | 12.00% | 52.00% | 6.24% |
| Preferred stock | 5.60% | 1.00% | 0.06% | 5.52% | 0.50% | 0.03% |
| Long-term debt | 4.89% | 47.00% | 2.30% | 5.16% | 47.50% | 2.45% |
| **Weighted average cost of capital** |  |  | **7.69%** |  |  | **8.72%** |

87

The proposed cost of capital and capital structure will be essential for the Utility to attract new investment capital to upgrade, maintain, and modernize its critical energy infrastructure. The Utility indicated in its application that, over the next four years (2019-2022), the Utility expects to fund up to $28 billion in energy infrastructure investments, including $21 billion in electric and gas safety and reliability and system hardening, $4 billion in new gas pipelines and electric powerlines, $1 billion in power generation, and $2 billion in information technology, equipment and facilities.

The Utility indicated in its supplemental cost of capital testimony that AB 1054 does not directly impact the Utility’s test year 2020 cost of debt. However, the cost of debt will be impacted by the Utility’s exit financing as part of its future chapter 11 plan of reorganization. The supplemental cost of capital testimony did not address the Utility’s currently-effective formula rate for electric transmission rates, including the requested return on equity, which is pending at the FERC. The parties in the FERC proceeding are currently involved in settlement negotiations.

The Utility also proposed to file a new cost of capital application with the CPUC on or about the time it emerges from its Chapter 11 proceeding. The Utility requested in its cost of capital application that the annual cost of capital adjustment mechanism be continued, although its normal operation could be superseded by a new cost of capital application. (The annual cost of capital adjustment mechanism is a tool to modify the cost of long-term debt and cost of equity authorized by the CPUC based on changes in interest rates.) The Utility is unable to predict the timing and outcome of this proceeding.

### Revenue Requirements

For 2020, the Utility expects that the proposed cost of capital, if adopted, would result in revenue requirement increases of approximately $271 million for electric generation and distribution and $74 million gas distribution operations, assuming 2017 authorized rate base amounts. The revenues for the gas transmission and storage operations would increase by approximately $51 million, assuming 2018 authorized rate base amounts. However, if the CPUC subsequently approves different electric and gas rate base amounts for the Utility in its 2019 GT&S Rate Case and its 2020 GRC, both currently pending before the CPUC, the revenue requirement changes resulting from the Utility’s requested 2020 ROE may differ from the amounts reflected in this cost of capital application.

The following table compares the revenue requirement amounts currently authorized in the Utility’s 2015 GT&S rate case and the 2017 GRC, with those requested in the Utility’s 2020 cost of capital application, as updated to reflect a revised rate of return on equity submitted to the CPUC on August 1, 2019:

| Revenue Requirement (in millions) | Authorized in 2017 GRC and 2015 GT&S | Requested in 2020 Cost of Capital Application (as revised) |
| --- | ---: | ---: |
| Electric generation and distribution | $6,266 | $6,537 |
| Gas distribution | 1,739 | 1,813 |
| Gas transmission and storage | $1,269 | $1,320 |

As disclosed in “Application for a Waiver of the Capital Structure Condition” above, due to the net charges recorded in connection with the 2018 Camp fire and the 2017 Northern California wildfires as of December 31, 2018, on February 28, 2019, the Utility submitted to the CPUC an application for a waiver of the capital structure condition. The 2020 cost of capital application does not modify that request.

On July 2, 2019, the assigned Commissioner issued a scoping memo and ruling that, among other things, consolidated the Utility’s proceeding with the 2020 cost of capital applications submitted to the CPUC by Southern California Edison Company, San Diego Gas & Electric Company, and Southern California Gas Company. The scoping memo also identified the issues to be addressed within the proceeding and its schedule. On July 15, 2019, the assigned ALJ also issued a ruling directing the Utility and the other Applicants to submit supplemental testimony regarding AB 1054’s impact on financial risks and other issues within the scope of this proceeding by August 1, 2019. According to the current schedule, rebuttal testimony is due August 16, 2019, and additional rebuttal on testimony regarding the passage of AB 1054 is due August 21, 2019. A proposed decision would be issued on November 15, 2019. A final decision would be issued no sooner than 30 days after the proposed decision. The Utility is unable to predict the timing and outcome of this proceeding.

### 2017 General Rate Case

On May 11, 2017, the CPUC issued a final decision in the Utility’s 2017 GRC, which determined the annual amount of base revenues (or “revenue requirements”) that the Utility is authorized to collect from customers from 2017 through 2019 to recover its anticipated costs for electric distribution, natural gas distribution, and electric generation operations and to provide the Utility an opportunity to earn its authorized rate of return. The final decision approved, with certain modifications, the settlement agreement that the Utility, PAO, TURN, and 12 other intervening parties jointly submitted to the CPUC on August 3, 2016. Consistent with the amounts proposed in the settlement agreement, the final decision approved a revenue requirement increase of $88 million for 2017, with additional increases of $444 million in 2018 and $361 million in 2019.

On September 24, 2018, the CPUC approved the Utility’s advice letter proposal to make a one-time reduction to revenues by approximately $21 million. This advice letter was directed by an ALJ ruling in response to the Utility’s $300 million expense reduction announcement in January 2017.

Also, as a result of the Tax Act, on March 30, 2018, the Utility submitted to the CPUC a PFM of the CPUC’s final decision in the 2017 GRC. The PFM, if adopted, would reduce revenue requirements by $267 million and $296 million for 2018 and 2019 respectively, and increase rate base by $199 million and $425 million for 2018 and 2019, respectively. On July 12, 2019, a proposed decision on the PFM was issued requesting that the Utility make additional reductions to the revenue requirements. There were two primary changes: first, to include the cost of removal component of book depreciation when calculating the amortization of protected excess deferred income taxes using the average rate assumption method (ARAM); and second, to amortize unprotected excess deferred taxes over a shorter period of time developed in collaboration with the Energy Division. The earliest the CPUC can consider this matter is on August 15, 2019. The Utility cannot predict the timing and outcome of this matter.

The Utility provided an update of the cost effectiveness study for the SmartMeterTM Upgrade project to the CPUC on July 10, 2017. On July 11, 2019, the CPUC further extended the statutory deadline for the 2017 GRC to February 9, 2020, in order to allow for comments and CPUC action on a PD on the SmartMeterTM upgrade cost effectiveness study. The Utility cannot predict the timing and outcome of any CPUC action in connection with this study.

For more information, see the 2018 Form 10-K.

### 2020 General Rate Case

On December 13, 2018, the Utility filed its 2020 GRC application with the CPUC. In the 2020 GRC, the Utility has requested that the CPUC determine the annual amount of base revenues (or “revenue requirements”) that the Utility will be authorized to collect from customers from 2020 through 2022 to recover its anticipated costs for electric distribution, natural gas distribution, and electric generation operations and to provide the Utility an opportunity to earn its authorized rate of return. The Utility’s request also reflects an updated capital forecast for 2018 and 2019. The 2020 GRC application also includes recorded costs for 2017 and updated forecasts for the proposed mitigations for the period 2018 through 2022 for the Utility’s top safety-related risks as presented in the Utility’s November 2017 Risk Assessment Mitigation Phase report.

For 2020, the Utility has requested base revenues of $9.6 billion, an increase of $1.1 billion, or 12.4%, as compared to authorized base revenues for 2019. The requested weighted average rate base for 2020 is approximately $30 billion, which corresponds to an increase of $2.7 billion over the 2019 authorized rate base of $27.3 billion. The Utility also requested that the CPUC establish a ratemaking mechanism that would increase the Utility’s authorized revenues in 2021 and 2022 by $454 million and $486 million, respectively. Over the 2020-2022 GRC period, the Utility plans to make average annual capital investments of approximately $4.5 billion in electric distribution, natural gas distribution and electric generation infrastructure, and to improve safety, reliability, and customer service.

| Line of Business: (in millions) | Amounts Requested in the GRC Application | Amounts Currently Authorized for 2019 (1) | Increase (Decrease) to 2019 Authorized Amounts |
| --- | ---: | ---: | ---: |
| Electric distribution | $5,113 | $4,364 | $749 |
| Gas distribution | 2,097 | 1,963 | 134 |
| Electric generation | 2,366 | 2,191 | 175 |
| **Total revenue requirements** | **$9,576** | **$8,518** | **$1,058** |

(1) These amounts include revenues from the Utility’s 2017 GRC decision adjusted for attrition year increases, cost of capital, and reductions due to the Tax Act.

| Cost Category: (in millions) | Amounts Requested in the GRC Application | Amounts Currently Authorized for 2019 (1) | Increase (Decrease) to 2019 Authorized Amounts |
| --- | ---: | ---: | ---: |
| Operations and maintenance | $2,156 | $1,946 | $210 |
| Customer services | 319 | 338 | (19) |
| Administrative and general | 1,315 | 953 | 361 |
| Less: Revenue credits | (196) | (152) | (44) |
| Franchise fees, taxes other than income, and other adjustments | 236 | 181 | 55 |
| Depreciation, return, and income taxes | 5,747 | 5,252 | 495 |
| **Total revenue requirements** | **$9,576** | **$8,518** | **$1,058** |

(1) These amounts include revenues from the Utility’s 2017 GRC decision adjusted for attrition year increases, cost of capital, and reductions due to the Tax Act.

(2) These amounts may appear not to tie due to small rounding differences.

| Revenue requirement drivers | Increase to 2019 Authorized Amounts |
| --- | ---: |
| Community Wildfire Safety Program | 6.8% |
| Liability insurance (1) | 3.2% |
| Core gas and electric operations | 2.4% |
| **Total proposed revenue requirement increase** | **12.4%** |

(1) The Utility’s GRC forecast indicates that future liability insurance premium costs will be approximately $355 million in 2020

Among other things, the Utility proposed to invest a total of approximately $5 billion (including approximately $3 billion for capital expenditures) between 2018 and 2022 on CWSP measures. Through this program, the Utility proposes to bolster wildfire prevention, risk monitoring, emergency response efforts, and add new and enhanced safety measures, increase vegetation management and harden its electric system to help further reduce wildfire risks.

In addition, the Utility requested authorization to establish several new balancing accounts, including:

- a two-way electric and gas Risk Transfer Balancing Account to record the difference between the amounts adopted for liability insurance premiums and the Utility’s actual costs; this two-way account would allow the Utility to pass-through actual insurance costs for up to $2 billion in coverage and return to customers any overcollection if forecast costs exceed actuals costs; and
- a two-way Wildfire Safety Balancing Account to track and record actual incremental expenses and capital revenue requirements associated with the incremental costs of fire risk mitigation work that are not already addressed and recorded in another account; this would include the costs associated with overhead system hardening, enhanced vegetation management, and other incremental costs of wildfire mitigations.

This GRC proposal did not request funding for potential lawsuits or claims resulting from the 2018 Camp fire and 2017 Northern California wildfires. Also, the Utility is not seeking recovery of compensation of PG&E Corporation’s and the Utility’s officers. In addition, the Chapter 11 Cases may require a change to the scope of work that the Utility proposes to accomplish in the 2020 GRC period. The Utility also may seek or may be required to update the scope of work for the 2019 Wildfire Safety Plan that was approved by the CPUC on June 4, 2019.

In its application, the Utility requests that the CPUC issue a final decision by March 2020 and that the 2020 GRC rates be effective January 1, 2020. On March 8, 2019, the CPUC issued a ruling addressing the schedule and scope of the 2020 GRC. The ruling indicates a proposed decision will be issued in the first quarter of 2020.

On June 28, 2019, PAO submitted testimony recommending that the CPUC authorize a 2020 GRC revenue requirement of $503 million, or 5.91%, higher than the 2019 authorized level. PAO also recommended establishing a one-way balancing account for the Utility’s revenue requirement during the rate case term (2020 to 2022).

### 2015 Gas Transmission and Storage Rate Case

In its final decisions in the Utility’s 2015 GT&S rate case, the CPUC excluded from rate base $696 million of capital spending in 2011 through 2014. This was the amount recorded in excess of the amount adopted in the 2011 GT&S rate case. The decision permanently disallowed $120 million of that amount and ordered that the remaining $576 million be subject to an audit overseen by the CPUC staff, with the possibility that the Utility may seek recovery in a future proceeding. The Utility would be required to take a charge in the future if the CPUC’s audit of 2011 through 2014 capital spending resulted in additional permanent disallowance. The audit is still in process. The Utility cannot predict the timing and outcome of the audit.

As a result of the Tax Act, on March 30, 2018, the Utility submitted to the CPUC a PFM of the CPUC’s final decision in the 2015 GT&S rate case proposing to reduce revenue requirements by $58 million and increase rate base by $12 million for 2018 (excluding the impacts of an approximately $7 million increase in revenue requirement and a $60 million increase in rate base associated with the Utility’s private letter ruling advice letter approved by the CPUC on July 18, 2018). On July 15, 2019, a proposed decision on the PFM was issued requesting that the Utility make additional reductions to the revenue requirements. There were two primary changes: first, to include the cost of removal component of book depreciation when calculating the amortization of protected excess deferred income taxes using the average rate assumption method (ARAM); and second, to amortize unprotected excess deferred taxes over a shorter period of time developed in collaboration with the Energy Division. The earliest a final decision could be voted is on August 15, 2019. The Utility cannot predict the timing and outcome of this matter.

For more information, see the 2018 Form 10-K.

### 2019 Gas Transmission and Storage Rate Case

On November 17, 2017, the Utility filed its 2019 GT&S rate case application with the CPUC for the years 2019 through 2021. The Utility also provided a revenue requirement and rates for 2022, in the event the CPUC adopts an additional year. On October 1, 2018, the Utility entered into a stipulation with PAO that, if approved, would extend the rate case cycle through 2022 as recommended by PAO.

In its application, the Utility requested that the CPUC authorize a 2019 revenue requirement of $1.59 billion to recover anticipated costs of providing natural gas transmission and storage services beginning on January 1, 2019. This corresponds to an increase of $289 million over the Utility’s 2018 authorized revenue requirement of $1.30 billion. The Utility’s request also proposed revenue requirements of $1.73 billion for 2020, $1.91 billion for 2021, and $1.91 billion for 2022 if the CPUC orders a fourth year for the rate case period.

The Utility subsequently revised its forecast revenue requirement as a result of the Tax Act and other forecast updates, including significant reductions in the areas of gas storage facilities and gas system operations programs. The revised revenue requirements are as follows: $1.48 billion for 2019, $1.59 billion for 2020, $1.69 billion for 2021, and $1.68 billion for 2022. The revised 2019 requested revenue requirement corresponds to an increase of $184 million over the Utility’s 2018 authorized revenue requirement.

The requested rate base for 2019 is $4.75 billion, which corresponds to an increase of $1.04 billion over the 2018 adopted rate base of $3.71 billion. The Utility’s request is based on capital expenditure forecasts of $829 million for 2019, $872 million for 2020, and $830 million for 2021 (which exclude common capital allocations). The requested rate base amounts exclude approximately $576 million of capital spending subject to audit by the CPUC related to 2011 through 2014 expenditures in excess of amounts adopted in the 2011 GT&S rate case. The Utility is unable to predict whether the $576 million, or a portion thereof, will ultimately be approved by the CPUC and included in the Utility’s future rate base.

The requested increase in revenue requirement is largely attributable to increased infrastructure investment and costs related to new natural gas storage safety and environmental regulations issued by DOGGR, the Pipeline and Hazardous Materials Safety Administration, and the CPUC.

In response to the Utility’s application, parties proposed various forecast reductions. For example, the PAO recommended a 2019 revenue requirement of $1.35 billion, an increase of $45 million over 2018 adopted amounts. TURN proposed widespread reductions in forecast costs and recommended capital and expense disallowances of more than $500 million.

A second phase of the proceeding addressed the removal of officer compensation costs from the revenue requirement, which is required by SB 901. On March 1, 2019, the Utility, PAO and TURN submitted a joint stipulation to the CPUC proposing to reduce the Utility’s requested 2019 GT&S operating expenses by $1.428 million and capital expenditures by $455,000 for total operating expenses and capital expenditures of $617 million and $829 million, respectively.

In this case, the CPUC will authorize the revenue requirement that the Utility will collect through rates to recover its anticipated costs of providing natural gas transmission and storage services from 2019 through 2021, or 2022, in the event the CPUC adopts an additional year.

On July 16, 2019, the assigned ALJ issued a PD in the Utility’s 2019 GT&S rate case pending at the CPUC. The PD proposes a 2019 revenue requirement of $1.327 billion compared to the Utility’s (revised) request of $1.485 billion. This corresponds to an increase of $27 million over the Utility’s 2018 authorized revenue requirement of $1.301 billion, compared to the $184 million increase requested by the Utility. The PD also proposes revenue requirements of $1.427 billion for 2020, and $1.511 billion for 2021, compared to the Utility’s request of $1.595 billion for 2020, and $1.693 million for 2021. The PD also proposes a revenue requirement of $1.575 billion for 2022, compared to the Utility’s request of $1.679 billion for 2022. The proposed revenue requirement for 2022 allows for the possible combination of the Utility’s 2023 GRC and GT&S rate cases.

The revenue requirement amounts requested by the Utility and the revenue requirement amounts in the PD are set forth in the following table:

| Revenue Requirement (in millions) | 2018 Currently Authorized | 2019 | 2020 | 2021 | 2022 |
| --- | ---: | ---: | ---: | ---: | ---: |
| Utility’s Request | $1,301 | $1,485 | $1,595 | $1,693 | $1,679 |
| PD | $1,301 | $1,327 | $1,427 | $1,511 | $1,575 |

The PD proposes to remove from rate base of $304 million of pipeline replacement capital expenditures for the 2016-2018 period due to cost overruns. Incorporating this reduction, the PD proposes a rate base for 2019 of $4.46 billion, which corresponds to an increase of $0.75 billion over the 2018 adopted rate base of $3.71 billion. This is compared to the Utility’s rate base request of $4.75 billion for 2019.

The PD proposes a rate base of $4.98 billion for 2020, $5.37 billion for 2021, and $5.71 billion for 2021. The rate base amounts also exclude approximately $576 million of capital spending subject to audit by the CPUC related to 2011 through 2014 expenditures in excess of amounts adopted in the 2011 GT&S rate case pursuant to the 2015 GT&S rate case decision. The Utility is unable to predict whether the $576 million, or a portion thereof, will ultimately be approved by the CPUC and included in the Utility’s future rate base.

The PD proposes the adoption of the Utility’s proposed Natural Gas Storage Strategy, with minor modifications related to the decommissioning or sale of the Utility’s Los Medanos and Pleasant Creek storage fields, and adopts a two-way balancing account for storage costs, which will be subject to a reasonableness review in the next GT&S rate case. The PD proposes to retain the one-way balancing account for transmission integrity management, and to adopt a number of new, one-way balancing accounts covering other operational areas.

If adopted, the PD also would resolve the second phase of the proceeding, which addressed the removal of officer compensation costs from the revenue requirement, which is required by SB 901. The PD proposes adoption of the joint stipulation offered by the Utility, PAO and TURN that reduces the Utility’s requested 2019 GT&S operating expenses by $1.428 million and capital expenditures by $0.455 million.

Opening comments on the PD were filed on August 5, 2019. The CPUC may vote on the PD, at the earliest, on August 15, 2019. The Utility is unable to predict the timing and outcome of this proceeding.

For more information, see the 2018 Form 10-K.

### Transmission Owner Rate Cases

### Transmission Owner Rate Cases for 2015 and 2016 (the “TO16” and “TO17” rate cases, respectively)

On January 8, 2018, the Ninth Circuit Court of Appeals issued an opinion granting an appeal of FERC’s decisions in the TO16 and TO17 rate cases that had granted the Utility a 50 basis point ROE incentive adder for its continued participation in the CAISO. Those rate case decisions were remanded to FERC for further proceedings consistent with the Court of Appeals’ opinion. If FERC concluded on remand that the Utility should no longer be authorized to receive the 50 basis point ROE incentive adder, the Utility would incur a refund obligation of $1 million and $8.5 million for TO16 and TO17, respectively. Alternatively, if FERC again concluded that the Utility should receive the 50 basis point ROE incentive adder and provides the additional explanation that the Ninth Circuit found the FERC’s prior decisions lacked, then the Utility would not owe any refunds for this issue for TO16 or TO17.

On February 28, 2018, the Utility filed a motion to establish procedures on remand requesting a hearing and additional briefing on the issues identified in the Ninth Circuit Court’s opinion. On August 20, 2018, FERC issued an order granting the Utility’s motion to allow for additional briefing. The order also consolidated the TO18 rate case with TO16 and TO17 for this issue. The Utility filed briefs on September 19, 2018 and reply briefs on October 10, 2018. On July 18, 2019, FERC issued its Order on Remand reaffirming its prior grant of the Utility’s request for the 50 basis point ROE adder.

### Transmission Owner Rate Case for 2017 (the “TO18” rate case)

On July 29, 2016, the Utility filed its TO18 rate case at the FERC requesting a 2017 retail electric transmission revenue requirement of $1.72 billion, a $387 million increase over the 2016 revenue requirement of $1.33 billion. The forecasted network transmission rate base for 2017 was $6.7 billion. The Utility is seeking a return on equity of 10.9%, which includes an incentive component of 50 basis points for the Utility’s continuing participation in the CAISO. In the filing, the Utility forecasted that it would make investments of $1.30 billion in 2017 in various capital projects.

On September 30, 2016, the FERC issued an order accepting the Utility’s July 2016 filing and set it for hearing, but held the hearing procedures in abeyance for settlement procedures. The order set an effective date for rates of March 1, 2017 and made the rates subject to refund following resolution of the case. On March 17, 2017, the FERC issued an order terminating the settlement procedures due to an impasse in the settlement negotiations reported by the parties. During the hearings held in January 2018, the Utility, intervenors, and the FERC trial staff, addressed questions relating to return on equity, capital structure, depreciation rates, capital additions, rate base, operating and maintenance expense, administrative and general expense, and the allocation of common, general and intangible costs.

Additionally, on March 31, 2017, intervenors in the TO18 rate case filed a complaint at the FERC alleging that the Utility failed to justify its proposed rate increase in the TO18 rate case. On November 16, 2017, the FERC dismissed the complaint. On December 18, 2017, the complainants filed a request for a rehearing of that order, which the FERC denied on May 17, 2018.

On October 1, 2018, the ALJ issued an initial decision in the TO18 rate case proposing a ROE of 9.13% compared to the Utility’s request of 10.90%, and an estimated composite depreciation rate of 2.83% compared to the Utility’s request of 3.25%. The ALJ also rejected the Utility’s method of allocating common plant between CPUC and FERC jurisdiction. In addition, the ALJ proposed to reduce forecasted capital and expense spending to actual costs incurred for the rate case period. Further, the ALJ proposed to remove certain items from the Utility’s rate base and revenue requirement. The Utility and intervenors filed initial briefs on October 31, 2018, and reply briefs on November 20, 2018, in response to the ALJ’s recommendations. The Utility expects FERC to issue a decision in late-2019, but expects one or more parties to seek rehearing of that decision and then appeal it to the courts. The Utility is unable to predict the timing of when a final decision will be issued.

### Transmission Owner Rate Case for 2018 (the “TO19” rate case)

On July 27, 2017, the Utility filed its TO19 rate case at the FERC requesting a 2018 retail electric transmission revenue requirement of $1.79 billion, a $74 million increase over the proposed 2017 revenue requirement of $1.72 billion. The forecasted network transmission rate base for 2018 is $6.9 billion. The Utility is seeking an ROE of 10.75%, which includes an incentive component of 50 basis points for the Utility’s continuing participation in the CAISO. In the filing, the Utility forecasted capital expenditures of approximately $1.4 billion. On September 28, 2017, the FERC issued an order accepting the Utility’s July 2017 filing, subject to hearing and refund, and established March 1, 2018, as the effective date for rate changes. FERC also ordered that the hearings be held in abeyance pending settlement discussion among the parties. On May 14, 2018, the Utility filed a proposal to reflect the impact of the Tax Act on its TO tariff rates effective March 1, 2018, in the resolution of the TO19 rate case. The tax impact reduces the TO19 requested revenue requirement from $1.79 billion to $1.66 billion.

On September 29, 2017, intervenors in the TO19 rate case filed a complaint at the FERC alleging that the Utility failed to justify its proposed rate increase in the TO19 rate case. On October 17, 2017, the Utility requested that the FERC dismiss the complaint. On May 17, 2018, the FERC issued an order setting the complaint for hearing, settlement judge procedures, and consolidation with the TO19 proceeding.

On September 21, 2018, the Utility filed an all-party settlement with FERC in connection with TO19. As part of the settlement, the TO19 revenue requirement will be set at 98.85% of the revenue requirement for TO18 that will be determined upon the issuance of a final unappealable TO18 decision. Additionally, if FERC determined that the Utility was not entitled to the 50 basis point incentive adder for the Utility’s continued CAISO participation, then the Utility would be obligated to make a refund to customers of approximately $25 million. On December 20, 2018, FERC issued an order approving the all-party settlement. Additionally, on July 18, 2019, FERC issued an Order on Remand reaffirming its grant of the Utility’s request for the 50 basis point incentive adder for continued CAISO participation.

### Transmission Owner Rate Case for 2019 (the “TO20” rate case)

On October 1, 2018, the Utility filed its TO20 rate case at FERC requesting approval of a formula rate for the costs associated with the Utility’s electric transmission facilities. On November 30, 2018, the FERC issued an order accepting the Utility’s October 2018 filing, subject to hearings and refund, and established May 1, 2019, as the effective date for rate changes. FERC also ordered that the hearings will be held in abeyance pending settlement discussions among the parties. The Utility is unable to predict the timing and outcome of settlement discussions.

The formula rate replaces the “stated rate” methodology that the Utility used in its previous TO rate case filings. The formula rate methodology still includes an authorized revenue requirement and rate base for a given year, but it also provides for an annual update of the following year’s revenue requirement and rates in accordance with the terms of the FERC-approved formula. Under the formula rate mechanism, transmission revenues, including Construction Work in Progress, will be updated to the actual cost of service annually. Differences between amounts collected and determined under the formula rate will be either collected from or refunded to customers.

In the filing, the Utility forecasts a 2019 retail electric transmission revenue requirement of $1.96 billion. The proposed amount reflects an approximately 9.5% increase over the as-filed TO19 requested revenue requirement of $1.79 billion (a subsequent reduction to $1.66 billion was identified as a result of the Tax Act). The Utility forecasts that it will make investments of approximately $1.1 billion and $0.7 billion for 2018 and 2019, respectively, for various capital projects to be placed in service before the end of 2019. Including projects to be placed in service beyond 2019, the Utility forecasts total electric transmission capital expenditures of $1.4 billion in 2018 and $1.4 billion in 2019. The Utility’s forecasted rate base for 2019 is approximately $8 billion on a weighted average basis, compared to the Utility’s forecasted rate base of $6.9 billion in 2018. The Utility has requested that FERC approve a 12.5% return on equity (which includes an incentive component of 50 basis points for the Utility’s continuing participation in the CAISO), an increase from the 10.75% (also inclusive of a 50 basis point CAISO incentive adder) requested in its TO19 rate case. The parties conducted a settlement conference on March 14 to 15, 2019 and on June 13 to 14, 2019. The next settlement conference is scheduled for August 13 to 14, 2019.

On May 9, 2019, the Utility filed an application with the FERC requesting revisions to its TO20 rate case formula rate model to remove the impact of this non-cash charge on the ratio of common equity to total capital. The Utility indicates in its application that, because of the recording of the non-cash wildfire-related charges in connection with the 2017 Northern California wildfires and the 2018 Camp fire, the Utility’s financial statements reflected a ratio of common equity to total capital of approximately 41% as of December 31, 2018. The Utility indicates that the proposed revisions adjust the equity ratio to accurately reflect how the Utility financed the capital projects that are included in rate base. The Utility’s current rate base was financed with an equity ratio of approximately 52%, rather than the 41% equity ratio. In addition, on May 9, 2019, the Utility submitted a request to the FERC to exclude the Wildfire Charge from the Utility’s capital structure for the purpose of calculating its Allowance for Funds Used During Construction (AFUDC) effective January 1, 2019.

On July 10, 2019, the FERC accepted the Utility’s revisions to the formula rate to become effective December 9, 2019, subject to refund, and established hearing and settlement judge procedures.

The Utility expects to file an annual update to its TO tariff on or before December 1 of each year beginning in December 2019, for rates and charges to become effective January 1 of the following year, consistent with the formula rate.

For more information on the TO rate cases, see the 2018 Form 10-K.

### Nuclear Decommissioning Cost Triennial Proceeding

The Utility expects that the decommissioning of Diablo Canyon will take many years after the expiration of its current operating licenses. Detailed studies of the cost to decommission the Utility’s nuclear generation facilities are conducted every three years in conjunction with the NDCTP. Actual decommissioning costs may vary from these estimates as a result of changes in assumptions such as regulatory requirements; technology; and costs of labor, materials, and equipment. The Utility recovers its revenue requirements for decommissioning costs from customers through a non-bypassable charge that the Utility expects will continue until those costs are fully recovered.

On December 13, 2018, the Utility submitted a Diablo Canyon site-specific decommissioning cost estimate of $4.8 billion which represents a total cost estimate to decommission the Diablo Canyon facilities.

On February 14, 2019, the CPUC issued a scoping memo authorizing addressing the scope of the NDCTP Proceeding to include reasonableness reviews of the Diablo Canyon decommissioning cost estimates, ratemaking proposals, proposed Diablo Canyon milestone framework, plans to address host community needs, reasonableness of Humboldt Bay Power Plant decommissioning costs, and reasonableness of preforming Diablo Canyon planning activities pre-shutdown including the proposed rate of recovery of these pre-planning activities addressed in Application 18-07-013.

On March 7, 2019, the CPUC amended the scoping memo to combine A.18-07-013, which seeks authorization for the Utility to establish the Diablo Canyon Decommissioning Memorandum Account to track funding for Diablo Canyon pre-shutdown decommissioning planning activities with the NDCTP A.18-12-008. The CPUC approved the Utility to establish an interim mechanism to track decommissioning planning activity expenses in the Diablo Canyon Decommissioning Memorandum Account. Any Memorandum Account recovery of such expenses is subject to the authorization and approval of the CPUC which will be discussed in this year’s NDCTP Proceeding. The CPUC will hold a public participation hearing for residents and organizations in and near San Luis Obispo to give their perspective and input to the CPUC about the Utility’s request to track costs of Diablo Canyon Decommissioning Planning Activities. The public participation hearing is scheduled for August 7 to 8, 2019.

On July 15, 2019, intervenors in this proceeding submitted their testimonies. Rebuttal Testimony is due August 15, 2019.

The Utility seeks to collect $383.7 million and $3.9 million for the funding of Diablo Canyon tax qualified trust and Humboldt Bay tax qualified trust, respectively, commencing January 1, 2020. Additionally, the Utility seeks cost recovery of pre-planning activities commencing January 1, 2020, of $30 million for the 3-year period 2020 to 2022 and a $44 million revenue requirements for the 2-year period 2023 to 2024; by an annual expense only balancing account. The Utility is also defending the reasonableness and prudence of the $398.4 million spent for Humboldt Bay Power Plant decommissioning project costs completed to date.

### Wildfire Expense Memorandum Account

On June 21, 2018, the CPUC issued a decision granting the Utility’s request to establish a WEMA to track specific incremental wildfire liability costs effective as of July 26, 2017. In the WEMA, the Utility can record costs related to wildfires, including: (1) payments to satisfy wildfire claims, including any deductibles, co-insurance and other insurance expense paid by the Utility but excluding costs that have already been forecasted and adopted in the Utility’s GRC; (2) outside legal costs incurred in the defense of wildfire claims; (3) insurance premium costs not in rates; and (4) the cost of financing these amounts. Insurance proceeds, as well as any payments received from third parties, or through FERC authorized rates, will be credited to the WEMA as they are received. The WEMA will not include the Utility’s costs for fire response and infrastructure costs which are tracked in the CEMA. The decision does not grant the Utility rate recovery of any wildfire-related costs. Any such rate recovery would require CPUC authorization in a separate proceeding. (See Notes 4 and 10 of the Notes to the Condensed Consolidated Financial Statements in Item 1.)

As of June 30, 2019, the Condensed Consolidated Financial Statements include long-term regulatory assets of $127 million, consisting of insurance premium costs that are probable of recovery. Should PG&E Corporation and the Utility conclude in future periods that recovery of insurance premiums in excess of amounts included in authorized revenue requirements is no longer probable, PG&E Corporation and the Utility will record a charge in the period such conclusion is reached.

### Catastrophic Event Memorandum Account Applications

The CPUC allows utilities to recover the reasonable, incremental costs of responding to catastrophic events that have been declared a disaster or state of emergency by competent federal or state authorities through a CEMA. In 2014, the CPUC directed the Utility to perform additional fire prevention and vegetation management work in response to the severe drought in California. The costs associated with this work are tracked in the CEMA. While the Utility believes such costs are recoverable through CEMA, its CEMA applications are subject to CPUC review and approval. For more information see Note 3 of the Notes to the Condensed Consolidated Financial Statements in Item 1.

### 2018 CEMA Application

On March 30, 2018, the Utility submitted to the CPUC its 2018 CEMA application requesting cost recovery of $183 million in connection with seven catastrophic events that included fire and storm declared emergencies from mid-2016 through early 2017, as well as $405 million related to work performed in 2016 and 2017 to cut back or remove dead or dying trees that were exposed to years of drought conditions and bark beetle infestation. The 2018 CEMA application originally sought cost recovery of $555 million on a forecast basis, subject to true-up if actual costs were greater or less than the forecast, for additional tree mortality and fire risk mitigation work anticipated in 2018 and 2019. However, on April 25, 2019, the CPUC adopted a decision denying cost recovery on a forecast basis for the 2018 and 2019 costs requested.

On November 2, 2018, the assigned ALJ denied the Utility’s July 25, 2018 motion requesting interim rate relief for $441 million, which represents 75% of the costs incurred in 2016 and 2017 related to storms, wildfires and tree mortality response work. Subsequently, on December 4, 2018, the Utility filed a renewed motion for interim rate relief, due to worsening financial conditions. The renewed motion for interim relief sought approximately $588 million, which represents 100% of the total costs incurred in 2016 and 2017 for the activities referenced above. The Utility requested that cost recovery occur over a one-year period, with the amounts collected to be subject to refund based on the authorized amount in the proceeding. On April 25, 2019, the CPUC authorized the Utility’s request for interim rate relief, allowing for recovery of $373 million of costs (63% of the total costs incurred in 2016 and 2017). Costs included in the interim rate relief are subject to audit and refund. On July 1, 2019, the Utility filed a motion requesting approval to: (i) revise the 2018 CEMA testimony and workpapers to exclude forecast costs, (ii) include 2018 recorded tree mortality and fire risk reduction costs, and (iii) assist with the hiring of an independent auditor for the recorded tree mortality costs included in the 2018 CEMA. The assigned Commissioner and ALJs issued three separate rulings on July 31, 2019, granting the Utility’s requests pertaining to the removal of the forecast costs and revisions and the inclusion of 2018 recorded tree mortality costs, and directed the Utility to assist with the hiring of an independent auditor in conjunction with the CPUC Energy Division. On August 7, 2019, the Utility filed a Revised Application, Revised Testimony and Revised Workpapers, reflecting a new revenue requirement request of $669 million. The $669 million incorporates (i) the removal of forecast tree mortality costs (reduction of approximately $555 million); (ii) inclusion of the 2018 Tree Mortality and Fire Risk Reduction activities (increase of approximately $90.318 million); and (iii) other corrections and updates found since the filing (reduction of approximately $9 million), as compared to the Utility’s original request of $1.14 billion.

The 2018 CEMA application does not include costs related to the 2015 Butte fire, the 2017 Northern California wildfires, or the 2018 Camp fire.

PG&E Corporation and the Utility are unable to predict the timing and outcome of the overall proceeding.

### Fire Hazard Prevention Memorandum Account

The CPUC allows utilities to track and record costs associated with implementing regulations and requirements adopted to protect the public from potential fire hazards associated with overhead power line facilities and nearby aerial communication facilities that have not been previously authorized in another proceeding. The Utility currently is authorized to track such costs in the FHPMA through the end of 2019. During 2018, the Utility recorded $262 million of costs to the FHPMA, corresponding to vegetation management work performed to comply with CPUC December 2017 fire safety regulations. While the Utility believes such costs are recoverable, rate recovery requires CPUC reasonableness review and authorization in a separate proceeding or through a GRC.

### Fire Risk Mitigation Memorandum Account

On March 12, 2019, the CPUC approved the Utility’s FRMMA to track costs incurred beginning January 1, 2019, for fire risk mitigation activities that are not otherwise covered in revenue requirements. The FRMMA was authorized by SB 901 to capture mitigation costs incurred in advance of the CPUC’s approval of the Utility’s Wildfire Mitigation Plan. The Utility has proposed that the FRMMA continue after the approval of its 2019 Wildfire Mitigation Plan to record costs of wildfire mitigation activities that were beyond the initial identified scope of work.

While the Utility intends to seek recovery of the FRMMA balance in a future application, rate recovery requires CPUC reasonableness review and authorization in a separate proceeding or through a GRC. PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows could be materially affected if the Utility is unable to timely recover costs in connection with the 2019 Wildfire Safety Plan recorded in the FRMMA, which the Utility expects will be substantial.

### Wildfire Plan Memorandum Account

On June 5, 2019, the Utility submitted an advice letter to establish the WPMA effective May 30, 2019. The purpose of the WPMA is to track costs incurred to implement the Utility’s Wildfire Mitigation Plan, as required by SB 901. The WPMA is required to be established upon approval of a utility’s wildfire mitigation plan to track costs incurred to implement the plan. Upon approval of the memorandum account, the Utility will record any costs incurred in implementing an approved Wildfire Mitigation Pan.

The Utility anticipates that the recovery of the costs recorded to the WPMA would occur through a general rate case or future application at which time the CPUC would review the costs for reasonableness as required by SB 901. PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows could be materially affected if the Utility is unable to timely recover costs in connection with the 2019 Wildfire Safety Plan recorded in the WPMA, which the Utility expects will be substantial.

### Other Regulatory Proceedings

### 2019 Wildfire Safety Plan

On October 25, 2018, the CPUC opened an OIR to implement the provisions of SB 901 related to electric utility wildfire mitigation plans. This OIR provided guidance on the form and content of the initial wildfire mitigation plans, provided a venue for review of the initial plans, and developed and refined the content of and process for review and implementation of wildfire mitigation plans to be filed in future years. In this proceeding the CPUC will consider, among other things, how to interpret and apply SB 901’s list of required plan elements, as well as whether additional elements beyond those required in SB 901 should be included in the wildfire mitigation plans. SB 901 also requires, among other things, that such plans include a description of the preventive strategies and programs to be adopted by an electrical corporation to minimize the risk of its electrical lines and equipment causing catastrophic wildfires, including the consideration of dynamic climate change risks, plans for vegetation management, and plans for inspections of the electrical corporation’s electrical infrastructure. The scope of this proceeding does not include utility recovery of costs related to wildfire mitigation plans, which SB 901 requires to be addressed in separate rate recovery applications.

On February 6, 2019, the Utility filed its wildfire mitigation plan (the “2019 Wildfire Safety Plan”) with the CPUC. The 2019 Wildfire Safety Plan describes forecasted work and investments in 2019 that are designed to help further reduce the potential for wildfire ignitions associated with the Utility’s electrical equipment in high fire-threat areas. The 2019 Wildfire Safety Plan specifically addresses wildfire risk factors that occur most frequently and have potential to start or spread a fire. The 2019 Wildfire Safety Plan focuses on the measures the Utility proposes to take in 2019, but includes longer-term plans, while acknowledging that the Utility may modify these plans based upon new information or conditions as the Utility implements these measures. The new and ongoing safety measures being pursued include:

- Installing nearly 600 new, high-definition cameras, made available to Cal Fire and local fire officials, in high fire-threat areas by 2022, increasing coverage across high fire-threat areas to more than 90%;
- Adding approximately 1,300 additional new weather stations by 2022, at a density of one station roughly every 20 circuit miles in high fire-threat areas;
- Conducting enhanced safety inspections of electric infrastructure in high-fire threat areas, including approximately 735,000 electric towers and poles across approximately 5,700 transmission line miles and 25,200 distribution line miles;
- Further enhancing vegetation management efforts across high and extreme fire-threat areas to address vegetation that poses higher potential for wildfire risk, such as removing or trimming trees from particular “at-risk” tree species that have exhibited a higher pattern of failing;
- Continuing to disable automatic reclosing in high fire-threat areas during wildfire season and periods of high fire-risk and upgrading reclosers and circuit breakers in high fire-threat areas with remote control capabilities;
- Expanding the Public Safety Power Shutoff Program (PSPS) to include all transmission and distribution lines in Tier 2 and Tier 3 High Fire-Threat District (HFTD) areas;
- Installing stronger and more resilient poles and covered power lines, including targeted undergrounding, starting in areas with the highest fire risk, ultimately upgrading and strengthening approximately 7,100 miles over the next 10 years; and
- Partnering with additional communities in high fire-threat areas to create new resilience zones that can power central community resources during a Public Safety Power Shutoff.

On February 12, February 14, and April 25, 2019, the Utility filed amendments to the 2019 Wildfire Safety Plan with the CPUC to correct inadvertent errors in the cost table attached to the 2019 Wildfire Safety Plan; refine language in the 2019 Wildfire Safety Plan; and modify certain 2019 Wildfire Safety Plan targets in light of external conditions, enhance other targets based on early learnings, and clarify targets to minimize the potential for misinterpretation, respectively.

On May 30, 2019, the CPUC approved two decisions related to the Utility’s 2019 Wildfire Safety Plan. The first decision was specific to the Utility’s plan and generally approved the plan, subject to certain reporting, data gathering, and other requirements set forth in the decision. The Utility-specific decision did not approve the amendment filed by the Utility on April 25, 2019. The second decision was a guidance decision for all of the utilities that submitted wildfire mitigation plans. This guidance decision included additional reporting, data gathering, and other requirements and provided that the Utility’s April 25th amendment will be examined in Phase 2 of this proceeding. On June 14, 2019, the Assigned Commissioner and ALJ issued a decision implementing Phase 2 of the OIR, announcing Phase 2 workshops to develop metrics and templates to evaluate the Utility’s 2019 Wildfire Safety Plan and report data consistently and a process for submission of the 2020 plans. The decision also announced that the CPUC would evaluate the Utility’s April 25th amendment in Phase 2, as well as the process for independent evaluation of the Utility’s compliance with its 2019 plan. PG&E Corporation and the Utility are unable to predict the timing and outcome of this proceeding. PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows could be materially affected if the Utility is unable to timely recover costs in connection with the 2019 Wildfire Safety Plan recorded in the FRMMA and WPMA, which the Utility expects will be substantial.

### OIR to Implement Public Utilities Code Section 451.2 Regarding Criteria and Methodology for Wildfire Cost Recovery Pursuant to Senate Bill 901

SB 901, signed into law on September 21, 2018, requires the CPUC to establish a customer harm threshold, directing the CPUC to limit certain disallowances in the aggregate, so that they do not exceed the maximum amount that the Utility can pay without harming ratepayers or materially impacting its ability to provide adequate and safe service (the “Customer Harm Threshold”). SB 901 also authorizes the CPUC to issue a financing order that permits recovery, through the issuance of recovery bonds (also referred to as “securitization”), of wildfire-related costs found to be just and reasonable by the CPUC and, only for the 2017 Northern California wildfires, any amounts in excess of the Customer Harm Threshold. SB 901 does not authorize securitization with respect to possible 2018 Camp fire costs.

On January 10, 2019, the CPUC adopted an OIR, which establishes a process to develop criteria and a methodology to inform determinations of the Customer Harm Threshold in future applications under Section 451.2(a) of the Public Utilities Code for recovery of costs related to the 2017 Northern California wildfires.

On March 29, 2019, the Assigned Commissioner issued a scoping memo, which confirmed that the CPUC in this proceeding would establish a Customer Harm Threshold methodology applicable only to 2017 fires, to be invoked in connection with a future application for cost recovery, and would not determine a specific financial outcome in this proceeding.

On July 8, 2019, the CPUC issued a decision in the Customer Harm Threshold proceeding. The CPUC decision provides that “\[a\]n electrical corporation that has filed for relief under chapter 11 of the Bankruptcy Code may not access the Stress Test to recover costs in an application under Section 451.2(b), because the Commission cannot determine the corporation’s ‘financial status,’ which includes, among other considerations, its capital structure, liquidity needs, and liabilities, as required by Section 451.2(b).” This determination effectively bars PG&E Corporation and the Utility from access to relief under the Customer Harm Threshold during the pendency of the Chapter 11 Cases. On August 7, 2019, the Utility submitted to the CPUC an application for rehearing of the decision. The Utility indicated in its application, among other things, that the CPUC’s decision “is contrary to law because it bars a utility that has filed for Chapter 11 from accessing the CHT \[Customer Harm Threshold\], requires a utility to file a cost recovery application before the CHT \[Customer Harm Threshold\] will be determined, and erects ratepayer protection mechanisms as an extra-statutory hurdle for accessing the CHT \[Customer Harm Threshold\].” The Utility also argued that the CPUC should apply the Customer Harm Threshold methodology to costs related to the 2018 Camp fire.

The decision otherwise adopts a methodology to determine the Customer Harm Threshold based on: (1) the maximum additional debt that a utility can take on and maintain a minimum investment grade credit rating; (2) excess cash available to the utility; (3) a potential maximum regulatory adjustment of either 20% of the Customer Harm Threshold or 5% of the total disallowed wildfire liabilities, whichever is greater; and (4) an adjustment to preserve for ratepayers any tax benefits associated with the Customer Harm Threshold. The decision also requires a utility to include proposed ratepayer protection measures to mitigate harm to ratepayers as part of an application under section 451.2(b).

Failure to obtain a substantial or full recovery of costs related to wildfires could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows.

### Transportation Electrification

California law SB 350 requires the CPUC, in consultation with the California Air Resources Board and the CEC, to direct electrical corporations to file applications for programs and investments to accelerate widespread TE. In September 2016, the CPUC directed the Utility and the other large IOUs to file TE applications that include both short-term projects (of up to $20 million in total) and two-to-five year programs with a requested revenue requirement determined by the Utility.

On May 31, 2018, the CPUC issued a final decision approving the Utility’s two-to-five year program proposals for actual expenditures up to approximately $269 million (including $198 million of capital expenditures), to support utility-owned make-ready infrastructure supporting public fast charging and medium to heavy-duty fleets. In the EV Fleet program, the Utility has a goal of providing make-ready infrastructure at 700 sites supporting 6,500 vehicles, conducting operation and maintenance of installed infrastructure, and educating customers on the benefits of electric vehicles. The final decision gives customers the option of self-funding, installing, owning, and maintaining the make-ready infrastructure installed beyond the customer meter in lieu of utility ownership, after which they would receive a utility rebate for a portion of those costs. The EV Fast Charge program has a goal to install utility-owned make-ready infrastructure at approximately 52 public charging sites amounting to roughly 234 DC fast chargers.

On December 19, 2018, the CPUC initiated a new Rulemaking for vehicle electrification matters (R.18-12-006). This new proceeding will include issues related to utility rate designs supporting transportation electrification and hydrogen fueling stations, a framework for IOUs’ transportation electrification investments, and vehicle-grid integration. A prehearing conference for this rulemaking was held on March 1, 2019. On May 2, 2019, the Assigned Commissioner issued a scoping memo and ruling for the proceeding, which sets forth the category, issues to be addressed, and schedule of the proceeding.

### Electric Distribution Resources Plan

As required by California law, on July 1, 2015, the Utility filed its proposed electric DRP for approval by the CPUC. The Utility’s DRP identifies its approach for identifying optimal locations on its electric distribution system for deployment of DERs. The Utility’s DRP approach is designed to allow distributed energy technologies to be integrated into the larger grid while continuing to provide customers with safe, reliable, and affordable electric service.

As part of the Utility’s DRP approach, on June 1, 2018, the Utility filed its first annual distribution grid needs assessment report with the CPUC, and on September 4, 2018, the Utility filed its first distribution deferral opportunity report. The distribution deferral report proposes cost effective electric distribution investments that can be deferred through deployment of dispatchable third-party-owned DERs, or non-wire alternative solutions, to operate during specific grid events. The Utility convened a distribution planning advisory group comprised of CPUC staff, ratepayer and environmental advocates, and DER market participants, to review and provide advisory input to the Utility on its distribution deferral identification process and to identify distribution deferral opportunities. After incorporating the advisory group’s input, on November 28, 2018, the Utility filed a proposal with the CPUC for competitively procuring distribution services from third-party owned DERs to defer selected distribution projects. Following the CPUC’s approval of the Utility’s procurement plan on February 5, 2019, the Utility launched a competitive solicitation and is currently evaluating offers. The Utility’s next annual distribution grid needs assessment and distribution deferral opportunity reports will be filed and served on August 15, 2019.

On March 26, 2018, the CPUC issued a final decision requiring the Utility to include a grid modernization plan for integrating DERs in the Utility’s GRC. The grid modernization plan for DERs must include a narrative 10-year vision for investments needed to support DER growth, while ensuring safety and service reliability. On June 25, 2018, the Utility hosted a public grid modernization workshop for integrating DERs to provide a high-level overview of its vision and 10-year plan and incorporate stakeholder input. On December 13, 2018, the Utility filed its 2020 GRC Application, which includes the Utility’s grid modernization vision and plan. On June 28, 2019, PAO submitted testimony recommending changes to the Utility’s grid modernization vision and plan in the Utility’s 2020 GRC application. See summary of PAO’s overall 2020 GRC testimony in “2020 General Rate Case” above.

### OIR to Consider Strategies and Guidance for Climate Change Adaptation

On April 26, 2018, the CPUC opened an OIR to consider strategies for integrating climate change adaptation matters into relevant CPUC proceedings. Phase one will focus on how to integrate climate change adaptation into the IOUs’ existing planning and operations to ensure utility safety and reliability.

The CPUC OIR will consider:

- how to define climate change adaptation for the IOUs;
- the climate-driven risks facing the IOUs;
- data, tools, resources, and guidance to instruct utilities on how to incorporate adaptation in their existing planning and operational processes; and
- strategies to address climate change in CPUC proceedings, including impacts on disadvantaged communities.

On October 10, 2018, the CPUC issued a scoping memo and established a procedural schedule. A final decision is expected in late 2019.

### OIR to Examine Utility De-energization of Power Lines in Dangerous Conditions

On December 13, 2018, the CPUC opened an OIR to examine the notification, mitigation, and reporting requirements on electric utilities when de-energizing power lines in case of dangerous conditions that threaten life or property in California. This proceeding has focused on the following issues:

- examining conditions in which proactive and planned de-energization is practiced;
- developing best practices and ensuring an orderly and effective set of criteria for evaluating de-energization programs;
- ensuring electric utilities coordinate with state and local level first responders, and align their systems with the Standardized Emergency Management System framework;
- mitigating the impact of de-energization on vulnerable populations;
- examining whether there are ways to reduce the need for de-energization;
- ensuring effective notice to affected stakeholders of possible de-energization and follow-up notice of actual de-energization; and
- ensuring consistency in notice and reporting of de-energization events.

On May 30, 2019, the CPUC approved a decision for phase one of this proceeding, which adopted de-energization communication and notification guidelines for the electric IOUs along with updates to requirements established in Resolution ESRB-8. The CPUC also provided clarity on phase two issues; however, a final determination of phase two issues will be conveyed in the phase two scoping memo. Phase 2 will take a more comprehensive look at de-energization practices, including mitigation, additional coordination across agencies, further refinements to findings in phase 1, re-energization practices, and other matters.

### LEGISLATIVE AND REGULATORY INITIATIVES

### Senate Bill 901

SB 901, signed into law on September 21, 2018, requires the CPUC to establish a Customer Harm Threshold (as defined herein), directing the CPUC to limit certain disallowances in the aggregate, so that they do not exceed the Customer Harm Threshold. SB 901 also authorizes the CPUC to issue a financing order that permits recovery, through the issuance of recovery bonds (also referred to as “securitization”), of wildfire-related costs found to be just and reasonable by the CPUC and, only for the 2017 Northern California wildfires, any amounts in excess of the Customer Harm Threshold. SB 901 does not authorize securitization with respect to possible 2018 Camp fire costs.

On January 10, 2019, the CPUC adopted an OIR, which establishes a process to develop criteria and a methodology to inform determinations of the Customer Harm Threshold in future applications under Section 451.2(a) of the Public Utilities Code for recovery of costs related to the 2017 Northern California wildfires. On March 29, 2019, the Assigned Commissioner issued a scoping memo, which confirmed that the CPUC in this proceeding would establish a Customer Harm Threshold methodology applicable only to 2017 fires, to be invoked in connection with a future application for cost recovery, and would not determine a specific financial outcome in this proceeding. On July 8, 2019, the CPUC issued a decision in the OIR, which establishes a methodology to establish the Customer Harm Threshold in future applications under Section 451.2(a), but determines that a utility that has filed for relief under Chapter 11 cannot access the Customer Harm Threshold. On August 7, 2019, the Utility submitted to the CPUC an application for rehearing of the decision. The Utility indicated in its application, among other things, that the CPUC’s decision “is contrary to law because it bars a utility that has filed for Chapter 11 from accessing the CHT \[Customer Harm Threshold\], requires a utility to file a cost recovery application before the CHT \[Customer Harm Threshold\] will be determined, and erects ratepayer protection mechanisms as an extra-statutory hurdle for accessing the CHT \[Customer Harm Threshold\].” The Utility also argued that the CPUC should apply the Customer Harm Threshold methodology to costs related to the 2018 Camp fire.

(See “Regulatory Matters - OIR to Implement Public Utilities Code Section 451.2 Regarding Criteria and Methodology for Wildfire Cost Recovery Pursuant to Senate Bill 901” above.)

In addition, SB 901 requires utilities to submit annual wildfire mitigation plans for approval by the CPUC on a schedule to be established by the CPUC. The wildfire mitigation plan must include the components specified in SB 901, such as identification and prioritization of wildfire risks, and drivers for those risks; plans for vegetation management; actions to harden the system, prepare for, and respond to events; and protocols for disabling reclosers and deenergizing the system. The CPUC has three months to approve a utility’s plan, with the ability to extend the deadline. The CPUC will conduct an annual compliance review, which will be supported by an independent evaluator’s report. The CPUC will complete the compliance review within 18 months. SB 901 establishes factors to be considered by the CPUC when setting penalties for failure to substantially comply with the plan. Costs associated with the wildfire mitigation plan are tracked in a memorandum account, and the costs of implementing the plan will be assessed in each utility’s GRC proceeding, or other application proceedings. The Utility is unable to predict the timing or outcome of the CPUC’s review of the wildfire mitigation plan, the results of the CPUC compliance review of wildfire mitigation plan implementation, or the timing or extent of cost recovery for wildfire mitigation plan activities.

### Assembly Bill 1054

On July 12, 2019, the California Governor signed into law AB 1054, a bill which provides for the establishment of a statewide fund that will be available for eligible electric utility companies to pay eligible claims for liabilities arising from wildfires occurring after July 12, 2019 that are caused by the applicable electric utility company’s equipment, subject to the terms and conditions of AB 1054. Eligible claims are claims for third party damages resulting from any such wildfires, limited to the portion of such claims that exceeds the greater of (i) $1.0 billion in the aggregate in any calendar year and (ii) the amount of insurance coverage required to be in place for the electric utility company pursuant to Section 3293 of the Public Utilities Code, added by AB 1054.

Each of California’s large investor-owned electric utility companies that are not currently subject to Chapter 11 (Southern California Edison and San Diego Gas & Electric Company) has elected to participate in the Wildfire Fund to be established under AB 1054. On July 23, 2019, the Utility notified the CPUC of its intent to participate in the Wildfire Fund (which participation is subject to the conditions set forth in AB 1054, including those conditions outlined below).

The Wildfire Fund to be established under AB 1054 will be available for eligible electric utility companies to pay eligible claims for liabilities arising from wildfires occurring after July 12, 2019 that are caused by the applicable electric utility company’s equipment. Electric utility companies that draw from the fund will only be required to repay amounts that are determined by the CPUC in an application for cost recovery not to be just and reasonable, subject to a rolling three-year disallowance cap equal to 20% of the electric utility company’s transmission and distribution equity rate base. For the Utility, this disallowance cap is expected to be approximately $2.3 billion for the three-year period starting in 2019, subject to adjustment based on changes in the Utility’s total transmission and distribution equity rate base. The disallowance cap is inapplicable in certain circumstances, including if the Wildfire Fund administrator determines that the electric utility company’s actions or inactions that resulted in the applicable wildfire constituted “conscious or willful disregard for the rights and safety of others,” or the electric utility company fails to maintain a valid safety certification. Costs that the CPUC determines to be just and reasonable will not need to be repaid to the fund, resulting in a draw-down of the fund. The Wildfire Fund and disallowance cap will be terminated when the amounts therein are exhausted. The Wildfire Fund is expected to be capitalized with (i) $10.5 billion of proceeds of bonds supported by a 15-year extension of the Department of Water Resources charge to ratepayers, (ii) $7.5 billion in initial contributions from California’s three investor-owned electric utility companies and (iii) $300 million in annual contributions paid by California’s three investor-owned electric utility companies. The contributions from the investor-owned electric utility companies will be effectively borne by their respective shareholders, as they will not be permitted to recover these costs from ratepayers. The costs of the initial and annual contributions are allocated among the three investor-owned electric utility companies pursuant to a “Wildfire Fund allocation metric” set forth in AB 1054 based on land area in the applicable utility’s service territory classified as high fire threat districts and adjusted to account for risk mitigation efforts. The Utility’s initial Wildfire Fund allocation metric is expected to be 64.2% (representing an initial contribution of approximately $4.8 billion and annual contributions of approximately $193 million). In addition, all initial and annual contributions will be excluded from the measurement of the Utility’s authorized capital structure.

AB 1054 provides that the Wildfire Fund will be established when Southern California Edison and San Diego Gas & Electric Company provide their initial contributions.

In order to participate in the Wildfire Fund, within 60 days of the effective date of AB 1054, the Utility must obtain the Bankruptcy Court’s approval of the Utility’s election to pay the initial and annual Wildfire Fund contributions upon emergence from Chapter 11. The Utility would then be required to pay its share of the initial contribution to the Wildfire Fund upon emergence from Chapter 11, and meet certain eligibility requirements listed below, in order to participate in the Wildfire Fund. In such event (assuming the Utility satisfies the eligibility and other requirements set forth in AB 1054), the Wildfire Fund will be available to the Utility to pay for eligible claims arising between the effective date of AB 1054 and the Utility’s emergence from Chapter 11, subject to a limit of 40% of the amount of such claims. The balance of any such claims would need to be addressed through the Chapter 11 Cases. There are several additional eligibility requirements for the Utility, including that by June 30, 2020, the following conditions are satisfied:

- the Utility’s Chapter 11 Case has been resolved pursuant to a plan of reorganization or similar document not subject to a stay;
- the Bankruptcy Court has determined that the resolution of the Utility’s Chapter 11 Case provides funding or otherwise provides for the satisfaction of any pre-petition wildfire claims asserted against the Utility in the Chapter 11 Case, in the amounts agreed upon in any settlement agreements, authorized by the Bankruptcy Court through an estimation process or otherwise allowed by the Bankruptcy Court;
- the CPUC has approved the Utility’s plan of reorganization and other documents resolving its Chapter 11 Case, including the Utility’s resulting governance structure as being acceptable in light of the Utility’s safety history, criminal probation, recent financial condition and other factors deemed relevant by the CPUC;
- the CPUC has determined that the Utility’s plan of reorganization and other documents resolving its Chapter 11 Case are (i) consistent with California’s climate goals as required pursuant to the California Renewables Portfolio Standard Program and related procurement requirements and (ii) neutral, on average, to the Utility’s ratepayers; and
- the CPUC has determined that the Utility’s plan of reorganization and other documents resolving its Chapter 11 Case recognize the contributions of ratepayers, if any, and compensate them accordingly through mechanisms approved by the CPUC, which may include sharing of value appreciation.

On August 7, 2019, PG&E Corporation and the Utility submitted a motion with the Bankruptcy Court for the entry of an order authorizing PG&E Corporation and the Utility to participate in the Wildfire Fund and to make any initial and annual contributions to the Wildfire Fund upon emergence from Chapter 11. The motion is expected to be heard on August 28, 2019, and objections and other responses are due August 21, 2019.

If the Utility satisfies the requirements to participate in the Wildfire Fund, the Utility will be required to fund its initial contribution upon its emergence from Chapter 11. The Utility’s required contributions to the Wildfire Fund will be substantial. Participation in the Wildfire Fund is expected to have a material impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows. The Utility is currently evaluating the accounting and tax treatment of the required initial and annual contributions. The timing and amount of any potential charges associated with shareholder contributions would also depend on various factors, including the final determination of an allocation of contributions among the Utility and California’s other large electric utility companies (San Diego Gas & Electric Company and Southern California Edison Company) and the timing of resolution of the Chapter 11 Cases. The Utility is currently developing a Chapter 11 plan of reorganization that would provide for the financing of such required contributions, but there can be no assurance that PG&E Corporation and the Utility will successfully develop, consummate or implement any such plan, which will ultimately require Bankruptcy Court, creditor and regulatory approval. Further, there can be no assurance that the expected benefits of participating in the Wildfire Fund ultimately outweigh its substantial costs.

AB 1054 includes certain modifications to the “just and reasonable” standard to be utilized by the CPUC in determining applications for recovery of wildfire-related costs. These modifications will apply to wildfires occurring following the effective date of AB 1054. AB 1054 provides that costs and expenses arising from any such wildfires “are just and reasonable if the conduct of the electrical corporation related to the ignition was consistent with actions that a reasonable utility would have undertaken in good faith under similar circumstances, at the relevant point in time, and based on the information available to the electrical corporation at the relevant point of time.” Further, in applying such standard, the CPUC is directed to take into account factors “both within and beyond the utility’s control that may have exacerbated the costs and expenses, including humidity, temperature, and winds.” Finally, AB 1054 modifies the circumstances under which an electric utility company bears the burden of demonstrating that its conduct was reasonable in accordance with the above standard.

AB 1054 also provides that the first $5.0 billion expended in the aggregate by California’s three investor-owned electric utility companies on fire risk mitigation capital expenditures included in their respective approved wildfire mitigation plans will be excluded from their respective equity rate bases. The $5.0 billion of capital expenditures will be allocated among the investor-owned electric utility companies in accordance with their Wildfire Fund allocation metrics (described above). AB 1054 contemplates that such capital expenditures may be securitized through a customer charge.

In response to directives in AB 1054, on July 26, 2019, the CPUC opened a new rulemaking to consider the authorization of a non-bypassable charge to support the Wildfire Fund. Comments on issues (e.g., the just and reasonableness of such a charge) are expected to be due in late August, 2019. A final decision in the proceeding is expected in October 2019.

### Power Charge Indifference Adjustment OIR

On October 11, 2018, the CPUC approved a decision to modify the PCIA methodology, which was developed after the 2001 California energy crisis, which adjusts how customers that leave the Utility’s bundled service for CCA or DA service pay for their share of the costs associated with long-term power purchase commitments made on their behalf. The decision better enables utilities to recover their above market costs from departing customers as compared to the previous methodology, by:

- adopting benchmark values used to set the PCIA rate that more closely resemble actual market prices for resource adequacy and renewable energy credits;
- continuing to allow legacy utility-owned generation costs to be recovered from CCA customers;
- eliminating the 10-year limit on PCIA cost recovery for post-2002 utility owned generation and certain storage costs; and
- adding an annual true-up to the PCIA rate based on market sales.

The Utility implemented a revised PCIA in rates as of July 1, 2019.

On December 19, 2018, a prehearing conference was held to initiate phase two of the PCIA proceeding, to further develop proposals for future consideration by the CPUC. On February 1, 2019, the assigned commissioner issued a phase two scoping memo and ruling, which sets forth the category, issues, need for hearing, schedule, and other matters. As indicated in the scoping memo and ruling, Phase Two of this proceeding will primarily rely upon a stakeholder working group process to further develop a number of PCIA-related proposals for consideration by the CPUC. Working Group One, which is co-facilitated by the Utility and the California Community Choice Association, focuses on developing benchmarks and a true-up mechanism that reflect the current market value of brown power, resource adequacy, and renewable energy credits (Issues 1 to 7); and load forecasting, rate design mechanics, and customer bill presentation (Issues 8 to 12). Working Group Two focuses on CCA and DA prepayment options; and Working Group Three focuses on portfolio optimization and cost reduction, allocation and auctions, and whether the CPUC should consider new or modified shareholder responsibility for future portfolio mismanagement. The schedule included in the scoping memo and ruling indicates that the CPUC is expected to issue two decisions impactful to 2020 rates in late 2019 concerning benchmark true-ups and PCIA rate design mechanics. Proposed decisions addressing matters relevant to the prepayment working group and the portfolio optimization and cost reduction, and allocation and auction working group are anticipated in 2020.

On May 31, 2019, the Working Group One co-leads filed the Final Report on Issues 1 to 7. On July 1, 2019, the Working Group One co-leads filed the Final Report on Issues 8 to 12. On July 9, 2019, the assigned ALJ modified the procedural schedule allowing parties to file comments on the July 1 Final Report, and updated the date for parties to request evidentiary hearings on the Final Report of Working Group One on Issues 8 to 12. Opening comments on issues 8 to 12 were filed on July 19, 2019, reply comments were filed on July 26, 2019, and motions for evidentiary hearings were due August 2, 2019. In accordance with the current schedule, a proposed decision on Working Group One issues 1 to 7 would be issued in September 2019, a proposed decision on Working Group One issues 8 to 12 would be issued in Fall 2019, and final decisions on each of those matters would be voted 30 days after those proposed decisions.

### ENVIRONMENTAL MATTERS

The Utility’s operations are subject to extensive federal, state, and local laws and permits relating to the protection of the environment and the safety and health of the Utility’s personnel and the public. These laws and requirements relate to a broad range of the Utility’s activities, including the remediation of hazardous wastes; the reporting and reduction of carbon dioxide and other GHG emissions; the discharge of pollutants into the air, water, and soil; the reporting of safety and reliability measures for natural gas storage facilities; and the transportation, handling, storage, and disposal of spent nuclear fuel. (See Note 11 of the Notes to the Condensed Consolidated Financial Statements in Item 1 of this Form 10-Q, as well as “Item 1A. Risk Factors” and Note 14 of the Notes to the Consolidated Financial Statements in Item 8 of the 2018 Form 10-K.)

### CONTRACTUAL COMMITMENTS

PG&E Corporation and the Utility enter into contractual commitments in connection with future obligations that relate to purchases of electricity and natural gas for customers, purchases of transportation capacity, purchases of renewable energy, and purchases of fuel and transportation to support the Utility’s generation activities. (See “Purchase Commitments” in Note 11 of the Notes to the Condensed Consolidated Financial Statements in Item 1). Contractual commitments that relate to financing arrangements include long-term debt, preferred stock, and certain forms of regulatory financing. For more in-depth discussion about PG&E Corporation’s and the Utility’s contractual commitments, see “Liquidity and Financial Resources” above and MD&A “Contractual Commitments” in Item 7 of the 2018 Form 10-K.

### Off-Balance Sheet Arrangements

PG&E Corporation and the Utility do not have any off-balance sheet arrangements that have had, or are reasonably likely to have, a current or future material effect on their financial condition, changes in financial condition, revenues or expenses, results of operations, liquidity, capital expenditures, or capital resources, other than those discussed in Note 14 of the Notes to the Consolidated Financial Statements in Item 8 of the 2018 Form 10-K (the Utility’s commodity purchase agreements).

### RISK MANAGEMENT ACTIVITIES

PG&E Corporation, mainly through its ownership of the Utility, and the Utility are exposed to risks associated with adverse changes in commodity prices, interest rates, and counterparty credit.

The Utility actively manages market risk through risk management programs designed to support business objectives, discourage unauthorized risk-taking, reduce commodity cost volatility, and manage cash flows. The Utility uses derivative instruments only for risk mitigation purposes and not for speculative purposes. The Utility’s risk management activities include the use of physical and financial instruments such as forward contracts, futures, swaps, options, and other instruments and agreements, most of which are accounted for as derivative instruments. Some contracts are accounted for as leases. The Utility manages credit risk associated with its counterparties by assigning credit limits based on evaluations of their financial conditions, net worth, credit ratings, and other credit criteria as deemed appropriate. Credit limits and credit quality are monitored periodically. These activities are discussed in detail in the 2018 Form 10-K. There were no significant developments to the Utility’s and PG&E Corporation’s risk management activities during the six months ended June 30, 2019.

### RECENT DEVELOPMENTS

### New Chief Executive Officer and Board Members

On April 3, 2019, PG&E Corporation announced the appointment of 10 new directors to the Board of Directors of PG&E Corporation, with seven of the 10 then-incumbent directors stepping down, to be effective later that month. On April 22, 2019, Richard C. Kelly resigned from the Boards of PG&E Corporation and the Utility. Also, PG&E Corporation entered into a Settlement Agreement (the “Settlement Agreement”) with Blue Mountain Credit Alternatives Master Fund L.P. (together with its affiliates, “BlueMountain”), who had previously nominated candidates for election to PG&E Corporation’s Board of Directors. In connection with the execution and delivery of the Settlement Agreement, among other things, Frederick W. Buckman was appointed to the Boards of Directors of PG&E Corporation and the Utility and BlueMountain withdrew its nominations. The full text of the Settlement Agreement with BlueMountain is attached as an exhibit to PG&E Corporation’s Current Report on Form 8-K filed with the SEC on April 23, 2019. As of May 2, 2019, the Boards of Directors of PG&E Corporation and the Utility were each constituted with the following individuals: Richard R. Barrera, Jeffrey L. Bleich, Nora Mead Brownell, Frederick W. Buckman, Cheryl F. Campbell, Fred J. Fowler, William D. Johnson (Utility Board only), Michael J. Leffell, Kenneth Liang, Dominique Mielle, Meridee A. Moore, Eric D. Mullins, Kristine M. Schmidt and Alejandro D. Wolff.

In addition, William D. Johnson joined PG&E Corporation as its new Chief Executive Officer and President, effective May 2, 2019. In connection with the Settlement Agreement, PG&E Corporation agreed to engage Christopher A. Hart, a former chairman of the National Transportation Safety Board, to provide consulting services to Mr. Johnson regarding matters of safety.

PG&E Corporation and the Utility expect that these leadership changes will have a significant impact on their operations and financial performance in the future.

### CRITICAL ACCOUNTING POLICIES

The preparation of the Condensed Consolidated Financial Statements in accordance with GAAP involves the use of estimates and assumptions that affect the recorded amounts of assets and liabilities as of the date of the Condensed Consolidated Financial Statements and the reported amounts of revenues and expenses during the reporting period. In addition to those items listed below, PG&E Corporation and the Utility consider their accounting policies for regulatory assets and liabilities, loss contingencies associated with environmental remediation liabilities and legal and regulatory matters, AROs, and pension and other post-retirement benefits plans to be critical accounting policies. These policies are considered critical accounting policies due, in part, to their complexity and because their application is relevant and material to the financial position and results of operations of PG&E Corporation and the Utility, and because these policies require the use of material judgments and estimates. Actual results may differ materially from these estimates. These accounting policies and their key characteristics are discussed in detail in the 2018 Form 10-K.

### Liabilities Subject to Compromise

As a result of the Chapter 11 Cases, the payment of pre-petition indebtedness is subject to compromise or other treatment under a plan of reorganization. The determination of how liabilities will ultimately be settled or treated cannot be made until the Bankruptcy Court confirms a Chapter 11 plan of reorganization and such plan becomes effective. Accordingly, the ultimate amount of such liabilities is not determinable at this time. ASC 852 requires pre-petition liabilities that are subject to compromise to be reported at the amounts expected to be allowed, even if they may be settled for lesser amounts. The amounts currently classified as liabilities subject to compromise are preliminary and may be subject to future adjustments depending on the Bankruptcy Court actions, further developments with respect to disputed claims, determinations of the secured status of certain claims, the values of any collateral securing such claims, rejection of executory contracts, continued reconciliation or other events.

### ACCOUNTING STANDARDS ISSUED BUT NOT YET ADOPTED

See the discussion above in Note 3 of the Notes to the Condensed Consolidated Financial Statements in Item 1.

### FORWARD-LOOKING STATEMENTS

This report contains forward-looking statements that are necessarily subject to various risks and uncertainties. These statements reflect management’s judgment and opinions that are based on current estimates, expectations, and projections about future events and assumptions regarding these events and management’s knowledge of facts as of the date of this report. These forward-looking statements relate to, among other matters, estimated losses, including penalties and fines, associated with various investigations and proceedings; forecasts of pipeline-related expenses that the Utility will not recover through rates; forecasts of capital expenditures; estimates and assumptions used in critical accounting policies, including those relating to regulatory assets and liabilities, environmental remediation, litigation, third-party claims, and other liabilities; and the level of future equity or debt issuances. These statements are also identified by words such as “assume,” “expect,” “intend,” “forecast,” “plan,” “project,” “believe,” “estimate,” “predict,” “anticipate,” “may,” “should,” “would,” “could,” “potential” and similar expressions. PG&E Corporation and the Utility are not able to predict all the factors that may affect future results. Some of the factors that could cause future results to differ materially from those expressed or implied by the forward-looking statements, or from historical results, include, but are not limited to:

- the risks and uncertainties associated with the Chapter 11 Cases, including, but not limited to, the ability to develop, consummate, and implement a plan of reorganization with respect to PG&E Corporation and the Utility, which could be adversely affected if the Exclusive Filing Period or the Exclusive Solicitation Period is terminated; the ability to develop and obtain applicable Bankruptcy Court, creditor or regulatory approvals; the effect of any alternative proposals, views or objections related to the plan of reorganization; potential complexities that may arise in connection with concurrent proceedings involving the Bankruptcy Court, the U.S. District Court, the CPUC, and the FERC; increased costs related to the Chapter 11 Cases; the ability to obtain sufficient financing sources for ongoing and future operations; disruptions to PG&E Corporation’s and the Utility’s business and operations and the potential impact on regulatory compliance;
- whether, in light of the CPUC July 8, 2019 final decision in the Customer Harm Threshold OIR that excludes companies in Chapter 11 from accessing the Customer Harm Threshold, the Utility will be able to obtain a substantial recovery of costs related to the 2017 Northern California wildfires;
- restrictions on PG&E Corporation’s and the Utility’s ability to pursue strategic and operational initiatives for the duration of the Chapter 11 Cases;
- PG&E Corporation’s and the Utility’s historical financial information not being indicative of future financial performance as a result of the Chapter 11 Cases;
- the potential delay in emergence from bankruptcy if PG&E Corporation and the Utility are not able to develop and consummate a consensual plan of reorganization and are forced to engage in a contested proceeding;
- the possibility that the DIP Credit Agreement is not sufficient to fund PG&E Corporation’s and the Utility’s cash requirements through their emergence from bankruptcy;
- the possibility that PG&E Corporation and the Utility may not be able to obtain exit financing on favorable terms or at all;
- the impact of AB 1054 on potential losses in connection with future wildfires;
- the outcome of the U.S. District Court matters and probation;
- the impact of the 2018 Camp fire and the 2017 Northern California wildfires, including whether the Utility will be able to timely recover costs incurred in connection with the wildfires in excess of the Utility’s currently authorized revenue requirements; the timing and outcome of the remaining wildfire investigations and the extent to which the Utility will have liability associated with these fires; the timing and amount of insurance recoveries; the timing and outcome of the 2017 Northern California Wildfires OII and potential liabilities in connection with fines or penalties that could be imposed on the Utility if the CPUC or any other law enforcement agency were to bring an enforcement action, including a criminal proceeding, and determined that the Utility failed to comply with applicable laws and regulations;
- the timing and outcome of any potential settlement with holders of wildfire-related claims;
- the ability of PG&E Corporation and the Utility to finance costs, expenses and other possible losses in respect of claims related to the 2018 Camp fire and the 2017 Northern California wildfires, through securitization mechanisms or otherwise, which potential financings are not addressed by AB 1054 as it only applies to future wildfires;
- the timing and outcome of claims arising from the 2015 Butte fire, including claims by the OES; the timing and outcome of any proceeding to recover related costs in excess of insurance through rates; and whether any regulatory enforcement proceedings in connection with the 2015 Butte fire will be opened and any additional fines or penalties imposed on the Utility;
- whether PG&E Corporation and the Utility are able to successfully challenge the application of the doctrine of inverse condemnation to the 2018 Camp fire, the 2017 Northern California wildfires and the 2015 Butte fire;
- the timing and outcome of future regulatory and legislative developments in connection with SB 901, including future wildfire reforms, inverse condemnation reform, and other wildfire mitigation measures or other reforms targeted at the Utility;
- the outcome of the Utility’s CWSP that the Utility has developed in coordination with first responders, civic and community leaders, and customers, to help reduce wildfire threats and improve safety as a result of climate-driven wildfires and extreme weather, including the Utility’s ability to comply with the targets and metrics set forth in the 2019 Wildfire Safety Plan; and the cost of the program, and the timing and outcome of any proceeding to recover such cost through rates;
- whether the Utility will be able to obtain full recovery of its significantly increased insurance premiums, and the timing of any such recovery;
- whether the Utility can obtain wildfire insurance at a reasonable cost in the future, or at all, and whether insurance coverage is adequate for future losses or claims;
- increased employee attrition as a result of the filing of the Chapter 11 Cases;
- the timing and outcomes of the 2019 GT&S rate case, 2020 GRC, FERC TO18, TO19, and TO20 rate cases, 2018 CEMA, future applications for WEMA, FHPMA and FRMMA, future cost of capital proceeding, and other ratemaking and regulatory proceedings;
- the outcome of the probation and the monitorship imposed by the federal court after the Utility’s conviction in the federal criminal trial in 2017, the timing and outcomes of the debarment proceeding, potential reliability penalties or sanctions from the North American Electric Reliability Corporation, the SED’s unresolved enforcement matters relating to the Utility’s compliance with natural gas-related laws and regulations, and other investigations that have been or may be commenced relating to the Utility’s compliance with natural gas- and electric- related laws and regulations, ex parte communications, and the ultimate amount of fines, penalties, and remedial costs that the Utility may incur in connection with the outcomes;
- the effects on PG&E Corporation’s and the Utility’s reputations caused by items such as the CPUC’s investigations of natural gas and electric incidents, the 2018 Camp fire and 2017 Northern California wildfires, locate and mark, improper communications between the CPUC and the Utility, and the Utility’s ongoing enhanced and accelerated inspection of its electric transmission and distribution assets;
- the implementation of the Safety Culture OII decision approved on November 29, 2018, and the outcome of the proceeding, and future legislative or regulatory actions that may be taken, such as requiring the Utility to separate its electric and natural gas businesses, or restructure into separate entities, or undertake some other corporate restructuring, or implement corporate governance changes;
- whether the Utility can control its costs within the authorized levels of spending, and timely recover its costs through rates; whether the Utility can continue implementing a streamlined organizational structure and achieve project savings, the extent to which the Utility incurs unrecoverable costs that are higher than the forecasts of such costs; and changes in cost forecasts or the scope and timing of planned work resulting from changes in customer demand for electricity and natural gas or other reasons;
- whether the Utility and its third-party vendors and contractors are able to protect the Utility’s operational networks and information technology systems from cyber- and physical attacks, or other internal or external hazards;
- the timing and outcome of the October 1, 2018 request for rehearing of FERC’s denial of the complaint filed by the CPUC and certain other parties that the Utility provide an open and transparent planning process for its capital transmission projects that do not go through the CAISO’s Transmission Planning Process to allow for greater participation and input from interested parties; and the timing and ultimate outcome of the Ninth Circuit Court of Appeals decision on January 8, 2018, to reverse FERC’s decision granting the Utility a 50 basis point ROE incentive adder for continued participation in the CAISO and remanding the case to FERC for further proceedings;
- the outcome of current and future self-reports, investigations, or other enforcement proceedings that could be commenced or notices of violation that could be issued relating to the Utility’s compliance with laws, rules, regulations, or orders applicable to its operations, including the construction, expansion, or replacement of its electric and gas facilities, electric grid reliability, inspection and maintenance practices, customer billing and privacy, physical and cybersecurity, environmental laws and regulations; and the outcome of existing and future SED notices of violations;
- the timing and outcome of any CPUC action in connection with the Utility’s SmartMeter™ Upgrade cost-benefit analysis;
- the impact of environmental remediation laws, regulations, and orders; the ultimate amount of costs incurred to discharge the Utility’s known and unknown remediation obligations; and the extent to which the Utility is able to recover environmental costs in rates or from other sources;
- the impact of SB 100, which was signed into law on September 10, 2018, that increases the percentage from 50% to 60% of California’s electricity portfolio that must come from renewables by 2030; and establishes state policy that 100% of all retail electricity sales must come from renewable portfolio standard-eligible or carbon-free resources by 2045;
- how the CPUC and the California Air Resources Board implement state environmental laws relating to GHG, renewable energy targets, energy efficiency standards, DERs, EVs, and similar matters, including whether the Utility is able to continue recovering associated compliance costs, such as the cost of emission allowances and offsets under cap-and-trade regulations; and whether the Utility is able to timely recover its associated investment costs;
- the impact of the California governor’s executive order issued on January 26, 2018, to implement a new target of five million zero-emission vehicles on the road in California by 2030;
- the ultimate amount of unrecoverable environmental costs the Utility incurs associated with the Utility’s natural gas compressor station site located near Hinkley, California and the Utility’s fossil fuel-fired generation sites;
- the impact of new legislation or NRC regulations, recommendations, policies, decisions, or orders relating to the nuclear industry, including operations, seismic design, security, safety, relicensing, the storage of spent nuclear fuel, decommissioning, cooling water intake, or other issues; the impact of potential actions, such as legislation, taken by state agencies that may affect the Utility’s ability to continue operating Diablo Canyon until its planned retirement;
- the impact of wildfires, droughts, floods, or other weather-related conditions or events, climate change, natural disasters, acts of terrorism, war, vandalism (including cyber-attacks), downed power lines, and other events, that can cause unplanned outages, reduce generating output, disrupt the Utility’s service to customers, or damage or disrupt the facilities, operations, or information technology and systems owned by the Utility, its customers, or third parties on which the Utility relies, and the reparation and other costs that the Utility may incur in connection with such conditions or events; the impact of the adequacy of the Utility’s emergency preparedness; whether the Utility incurs liability to third parties for property damage or personal injury caused by such events; whether the Utility is subject to civil, criminal, or regulatory penalties in connection with such events; and whether the Utility’s insurance coverage is available for these types of claims and sufficient to cover the Utility’s liability;
- whether the Utility’s climate change adaptation strategies are successful;
- the breakdown or failure of equipment that can cause damages, including fires, and unplanned outages; and whether the Utility will be subject to investigations, penalties, and other costs in connection with such events;
- the impact that reductions in Utility customer demand for electricity and natural gas, driven by customer departures to CCAs and DA providers, have on the Utility’s ability to make and recover its investments through rates and earn its authorized return on equity, and whether the Utility is successful in addressing the impact of growing distributed and renewable generation resources, changing customer demand for its natural gas and electric services;
- the supply and price of electricity, natural gas, and nuclear fuel; the extent to which the Utility can manage and respond to the volatility of energy commodity prices; the ability of the Utility and its counterparties to post or return collateral in connection with price risk management activities; and whether the Utility is able to recover timely its electric generation and energy commodity costs through rates, including its renewable energy procurement costs;
- the amount and timing of charges reflecting probable liabilities for third-party claims; the extent to which costs incurred in connection with third-party claims or litigation can be recovered through insurance, rates, or from other third parties; and whether the Utility can continue to obtain adequate insurance coverage for future losses or claims, especially following a major event that causes widespread third-party losses;
- the ability of PG&E Corporation and the Utility to access capital markets and other sources of debt and equity financing in a timely manner and on acceptable terms;
- the impact of the regulation of utilities and their holding companies, including how the CPUC interprets and enforces the financial and other conditions imposed on PG&E Corporation when it became the Utility’s holding company, and whether the uncertainty in connection with the 2018 Camp fire and the 2017 Northern California wildfires, the ultimate outcomes of the CPUC’s pending investigations, and other enforcement matters will impact the Utility’s ability to make distributions to PG&E Corporation;
- the outcome of federal or state tax audits and the impact of any changes in federal or state tax laws, policies, regulations, or their interpretation;
- changes in the regulatory and economic environment, including potential changes affecting renewable energy sources and associated tax credits, as a result of the current federal administration; and
- the impact of changes in GAAP, standards, rules, or policies, including those related to regulatory accounting, and the impact of changes in their interpretation or application.

For more information about the significant risks that could affect the outcome of the forward-looking statements and PG&E Corporation’s and the Utility’s future financial condition, results of operations, liquidity, and cash flows, see Item 1A. Risk Factors below and a detailed discussion of these matters contained elsewhere in MD&A. PG&E Corporation and the Utility do not undertake any obligation to update forward-looking statements, whether in response to new information, future events, or otherwise.

Additionally, PG&E Corporation and the Utility routinely provide links to the Utility’s principal regulatory proceedings before the CPUC and the FERC at http://investor.pgecorp.com, under the “Regulatory Filings” tab, so that such filings are available to investors upon filing with the relevant agency. PG&E Corporation and the Utility also routinely post or provide direct links to presentations, documents, and other information that may be of interest to investors at http://investor.pgecorp.com, under the “News & Events: Events & Presentations” tab and links to certain documents and information related to the 2018 Camp fire, the 2017 Northern California wildfires, the 2015 Butte fire, and other updates which may be of interest to investors, at http://investor.pgecorp.com, under the “Wildfire Updates” tab, in order to publicly disseminate such information. It is possible that any of these filings or information included therein could be deemed to be material information. The information contained on this website is not part of this or any other report that PG&E Corporation or the Utility files with, or furnishes to, the SEC. PG&E Corporation and the Utility are providing the address to this website solely for the information of investors and do not intend the address to be an active link.

## Market risk

As filed, 616 characters.

PG&E Corporation’s and the Utility’s primary market risk results from changes in energy commodity prices. PG&E Corporation and the Utility engage in price risk management activities for non-trading purposes only. Both PG&E Corporation and the Utility may engage in these price risk management activities using forward contracts, futures, options, and swaps to hedge the impact of market fluctuations on energy commodity prices and interest rates. (See the section above entitled “Risk Management Activities” in MD&A and in Note 8 and Note 9 of the Notes to the Condensed Consolidated Financial Statements in Item 1.)

## Controls and procedures

As filed, 1,197 characters.

Based on an evaluation of PG&E Corporation’s and the Utility’s disclosure controls and procedures as of June 30, 2019, PG&E Corporation’s and the Utility’s respective principal executive officers and principal financial officers have concluded that such controls and procedures are effective to ensure that information required to be disclosed by PG&E Corporation and the Utility in reports that the companies file or submit under the Securities Exchange Act of 1934, as amended, is (i) recorded, processed, summarized, and reported within the time periods specified in the SEC rules and forms, and (ii) accumulated and communicated to PG&E Corporation’s and the Utility’s management, including PG&E Corporation’s and the Utility’s respective principal executive officers and principal financial officers, or persons performing similar functions, as appropriate to allow timely decisions regarding required disclosure.

There were no changes in internal control over financial reporting that occurred during the quarter ended June 30, 2019, that have materially affected, or are reasonably likely to materially affect, PG&E Corporation’s or the Utility’s internal control over financial reporting.

## Risk factors

As filed, 8,549 characters.

For information about the significant risks that could affect PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows, see the section of the 2018 Form 10-K and PG&E Corporation’s and the Utility’s combined Quarterly Report on Form 10-Q for the quarterly period ended March 31, 2019 entitled “Risk Factors,” as supplemented below, and the section of this quarterly report entitled “Forward-Looking Statements.”

***PG&E Corporation’s and the Utility’s financial results could be materially affected as a result of legislative and regulatory developments.***

The Utility’s financial results could be materially affected as a result of SB 901 adopted in 2018 by the California legislature. In December 2018, the CPUC opened an OIR in connection with SB 901 that will adopt criteria and a methodology for use by the CPUC in future applications for cost recovery of wildfire costs. On July 8, 2019, the CPUC issued a decision in the Customer Harm Threshold proceeding. The CPUC decision provides that “\[a\]n electrical corporation that has filed for relief under chapter 11 of the Bankruptcy Code may not access the Stress Test to recover costs in an application under Section 451.2(b), because the Commission cannot determine the corporation’s ‘financial status,’ which includes, among other considerations, its capital structure, liquidity needs, and liabilities, as required by Section 451.2(b).” This determination effectively bars PG&E Corporation and the Utility from access to relief under the Customer Harm Threshold during the pendency of the Chapter 11 Cases. On August 7, 2019, the Utility submitted to the CPUC an application for rehearing of the decision. Failure to obtain a substantial or full recovery of costs related to wildfires could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows. (See “Regulatory Matters - Other Regulatory Proceedings” in Item 2. MD&A.)

In addition, SB 901 requires utilities to submit annual wildfire mitigation plans for approval by the CPUC on a schedule to be established by the CPUC. SB 901 establishes factors to be considered by the CPUC when setting penalties for failure to substantially comply with the plan. The Utility is unable to predict the timing or outcome of the CPUC’s review of the wildfire mitigation plan, the results of the CPUC compliance review of wildfire mitigation plan implementation, or the timing or extent of cost recovery for wildfire mitigation plan activities. Failure to substantially comply with the plan could result in fines and other penalties imposed on the Utility that could be material. (See “Regulatory Matters - Other Regulatory Proceedings” in Item 2. MD&A.)

On July 12, 2019, the California Governor signed into law AB 1054, a bill which, among other policy reforms, provides for the establishment of a statewide fund that would be available for eligible electric utility companies to pay eligible claims for liabilities arising from wildfires occurring after July 12, 2019 that are caused by the applicable electric utility company’s equipment. Although PG&E Corporation and the Utility have delivered notice to the CPUC electing to participate in the Wildfire Fund, the impact of AB 1054 on PG&E Corporation and the Utility is subject to numerous uncertainties, including the Utility’s eligibility to access relief under the Wildfire Fund (which is dependent on, among other things, PG&E Corporation and the Utility emerging from Chapter 11 by June 30, 2020 and making its initial contribution thereto) and the Utility’s ability to demonstrate to the CPUC that wildfire-related costs paid from the Wildfire Fund are just and reasonable, subject to a disallowance cap. Failure to meet the eligibility conditions to access relief under the Wildfire Fund, including emerging from Chapter 11 by June 30, 2020 and making the initial contribution thereto, would preclude PG&E Corporation and the Utility from accessing the Wildfire Fund for future wildfire-related claims and any related benefits, including the disallowance cap.

The costs of participating in the Wildfire Fund (should the Utility be eligible to do so) are expected to exceed $6.7 billion. The Utility is currently evaluating the accounting and tax treatment of the required initial and annual contributions. The timing and amount of any potential charges associated with shareholder contributions would also depend on various factors, including the final determination of an allocation of contributions among the Utility and California’s other large electric utility companies (San Diego Gas & Electric Company and Southern California Edison Company) and the timing of resolution of the Chapter 11 Cases. Participation in the Wildfire Fund is expected to have a material impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows, and there can be no assurance that the benefits of participating in the Wildfire Fund ultimately outweigh these substantial costs.

Finally, AB 1054 does not apply to wildfires with an ignition date prior to the effective date of AB 1054. PG&E Corporation and the Utility may be dependent on additional legislative measures in order to facilitate the financing of costs, expenses and other possible losses in respect of claims related to the 2018 Camp fire and the 2017 Northern California wildfires. There can be no assurance that any such legislative measures will be enacted or enacted in a form that would materially address PG&E Corporation’s and the Utility’s financing needs.

Also, in June 2018, the State of California enacted the CCPA, which will come into effect on January 1, 2020, with a 12-month look-back period requiring compliance by January 1, 2019. The CCPA requires companies that process information on California residents to make new disclosures to consumers about their data collection, use and sharing practices, allows consumers to opt out of certain data sharing with third parties and provides a new cause of action for data breaches. The CCPA provides for financial penalties in the event of non-compliance and statutory damages in the event of a data security breach. However, California legislators have stated that they intend to propose amendments to the CCPA, and it remains unclear what, if any, modifications will be made to the CCPA or how it will be interpreted. Failure to comply with the CCPA could result in fines imposed on PG&E Corporation and the Utility that could be material.

***The Utility’s insurance coverage may not be sufficient to cover losses caused by an operating failure or catastrophic events, including severe weather events, or may not be available at a reasonable cost, or available at all.***

The Utility has experienced increased costs and difficulties in obtaining insurance coverage for wildfires and other risks that could arise from the Utility’s ordinary operations. PG&E Corporation, the Utility or its contractors and customers could continue to experience coverage reductions and/or increased insurance costs in future years. No assurance can be given that future losses will not exceed the limits of the Utility’s insurance coverage. Uninsured losses and increases in the cost of insurance may not be recoverable in customer rates. A loss that is not fully insured or cannot be recovered in customer rates could materially affect PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows.

As a result of the potential application to investor-owned utilities of a strict liability standard under the doctrine of inverse condemnation, recent losses recorded by insurance companies, the risk of increased wildfires including as a result of climate change, the 2018 Camp fire, the 2017 Northern California wildfires, and the 2015 Butte fire, the Utility may not be able to obtain sufficient insurance coverage in the future at a reasonable cost, or at all. In addition, the Utility is unable to predict whether it would be allowed to recover in rates the increased costs of insurance or the costs of any uninsured losses.

If the amount of insurance is insufficient or otherwise unavailable, or if the Utility is unable to obtain insurance at a reasonable cost or recover in rates the costs of any uninsured losses, PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected.