## Figures reported in this filing

Standardized XBRL line items for the period ended 2020-09-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2020-07-01 to 2020-09-30 | $4.88bn | us-gaap:RevenueFromContractWithCustomerExcludingAssessedTax |
| Revenue | 9 months, 2020-01-01 to 2020-09-30 | $13.72bn | us-gaap:RevenueFromContractWithCustomerExcludingAssessedTax |
| Operating income | 3 months, 2020-07-01 to 2020-09-30 | $398.0m | us-gaap:OperatingIncomeLoss |
| Operating income | 9 months, 2020-01-01 to 2020-09-30 | $1.33bn | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2020-07-01 to 2020-09-30 | $391.0m | us-gaap:InterestExpense |
| Interest expense | 9 months, 2020-01-01 to 2020-09-30 | $844.0m | us-gaap:InterestExpense |
| Income tax | 3 months, 2020-07-01 to 2020-09-30 | −$109.0m | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 9 months, 2020-01-01 to 2020-09-30 | $394.0m | us-gaap:IncomeTaxExpenseBenefit |
| Diluted EPS | 3 months, 2020-07-01 to 2020-09-30 | $0.04 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 9 months, 2020-01-01 to 2020-09-30 | −$1.50 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2020-07-01 to 2020-09-30 | $0.04 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 9 months, 2020-01-01 to 2020-09-30 | −$1.50 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2020-07-01 to 2020-09-30 | 2,140,000,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 9 months, 2020-01-01 to 2020-09-30 | 1,012,000,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 9 months, 2020-01-01 to 2020-09-30 | −$19.22bn | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 9 months, 2020-01-01 to 2020-09-30 | $5.47bn | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Cash and equivalents | at 2020-09-30 | $464.0m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2020-09-30 | $9.80bn | us-gaap:AssetsCurrent |
| Total assets | at 2020-09-30 | $95.59bn | us-gaap:Assets |
| Current liabilities | at 2020-09-30 | $13.32bn | us-gaap:LiabilitiesCurrent |
| Long-term debt | at 2020-09-30 | $36.31bn | us-gaap:LongTermDebtNoncurrent |
| Short-term borrowings | at 2020-09-30 | $2.43bn | us-gaap:ShortTermBorrowings |
| Shareholders' equity | at 2020-09-30 | $20.81bn | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 185,095 characters.

### OVERVIEW

PG&E Corporation is a holding company whose primary operating subsidiary is Pacific Gas and Electric Company, a public utility serving northern and central California. The Utility generates revenues mainly through the sale and delivery of electricity and natural gas to customers.

The Utility is regulated primarily by the CPUC and the FERC. The CPUC has jurisdiction over the rates, terms, and conditions of service for the Utility’s electricity and natural gas distribution operations, electric generation, and natural gas transportation and storage. The FERC has jurisdiction over the rates and terms and conditions of service governing the Utility’s electric transmission operations and interstate natural gas transportation contracts. The NRC oversees the licensing, construction, operation, and decommissioning of the Utility’s nuclear generation facilities. The Utility is also subject to the jurisdiction of other federal, state, and local governmental agencies.

This is a combined quarterly report of PG&E Corporation and the Utility and should be read in conjunction with each company’s separate Condensed Consolidated Financial Statements and the Notes to the Condensed Consolidated Financial Statements included in this Form 10-Q. It also should be read in conjunction with the 2019 Form 10-K.

### Chapter 11 Proceedings

On the Petition Date, PG&E Corporation and the Utility filed voluntary petitions for relief under Chapter 11 in the Bankruptcy Court. PG&E Corporation’s and the Utility’s Chapter 11 Cases were jointly administered under the caption In re: PG&E Corporation and Pacific Gas and Electric Company, Case No. 19-30088 (DM). On the Effective Date, PG&E Corporation and the Utility emerged from Chapter 11. For additional information regarding the Chapter 11 Cases, refer to the website maintained by Prime Clerk, LLC, PG&E Corporation’s and the Utility’s claims and noticing agent, at http://restructuring.primeclerk.com/pge. The contents of this website are not incorporated into this document.

For more information about Chapter 11 emergence and related transactions, see the Notes to the Condensed Consolidated Financial Statements in Item 1 of this Form 10-Q.

### Chapter 11 Emergence

PG&E Corporation and the Utility emerged from Chapter 11 on July 1, 2020. For more information regarding the Chapter 11 emergence and the related transactions, see the Notes to the Condensed Consolidated Financial Statements in Item 1 of this Form 10-Q.

### Tax Matters

As a result of the Plan, which includes wildfire settlement payments made in the third quarter of 2020, PG&E Corporation expects to have a federal net operating loss carryforward of around $26.0 billion and state net operating loss carryforward of $23.0 billion at the end of 2020.

Under Section 382 of the Internal Revenue Code, if a corporation (or a consolidated group) undergoes an “ownership change,” net operating loss carryforwards and other tax attributes may be subject to certain limitations. In general, an ownership change occurs if the aggregate stock ownership of certain shareholders (generally 5% shareholders, applying certain look-through and aggregation rules) increases by more than 50% over such shareholders’ lowest percentage ownership during the testing period (generally three years). PG&E Corporation’s and the Utility’s Amended Articles limit Transfers (as defined in the Amended Articles) that increase a person’s ownership of PG&E Corporation’s equity securities to more than 4.75% prior to the Restriction Release Date without approval by the Board of Directors. As discussed below under “Update on Ownership Restrictions in PG&E Corporation’s Amended Articles,” the calculation of the percentage ownership may differ depending on whether the Fire Victim Trust is treated as a qualified settlement trust or grantor trust.

As of the date of this report, PG&E Corporation does not believe that it has undergone an ownership change, and consequently, its net operating loss carryforwards and other tax attributes are not limited by Section 382 of the Internal Revenue Code.

In 2019, $6.75 billion of the liability to be paid to the Fire Victim Trust in PG&E Corporation’s common stock was accrued by the Utility. Because the corresponding tax deduction generally occurs no earlier than payment, the Utility established a deferred tax asset for the accrual in 2019. On July 1, 2020, the Utility paid to the Fire Victim Trust 477 million shares of PG&E Corporation’s common stock. Because of the price of the stock on the date of transfer, the shares transferred to the Fire Victim Trust were valued at $4.53 billion, $2.22 billion less than the $6.75 billion that had been accrued as a liability in the Condensed Consolidated Financial Statements. Therefore, in the quarter ended June 30, 2020, the Utility recorded a charge of $619 million to adjust the measurement of the deferred tax asset to reflect the tax-effected difference between the accrual of $6.75 billion and the tax deduction of $4.53 billion for the transfer of PG&E Corporation’s shares to the Fire Victim Trust.

In addition, this deferred tax asset reflects PG&E Corporation’s conclusion as of September 30, 2020 that it is more likely than not that the Fire Victim Trust will be treated as a “qualified settlement fund” for U.S. federal income tax purposes, in which case the corresponding tax deduction will have occurred at the time the PG&E Corporation common stock was transferred to the Fire Victim Trust. As discussed further below under “Update on Ownership Restrictions in PG&E Corporation’s Amended Articles,” PG&E Corporation believes that it may be beneficial to elect to treat the Fire Victim Trust as a “grantor trust,” but only if PG&E Corporation receives favorable determinations from the IRS regarding certain aspects of such election. If PG&E Corporation makes a “grantor trust” election for the Fire Victim Trust, the Utility’s tax deduction will occur instead at the time the Fire Victim Trust pays the fire victims and will be based on the price at which the Fire Victim Trust sells the shares. In this case, the accounting treatment will require a re-evaluation under applicable accounting guidance of the remaining deferred tax asset and could result in a further impairment thereof or other material impact on the Condensed Consolidated Financial Statements. Additionally, the value of the deduction may be materially different than the value of the deduction if the Fire Victim Trust is treated as a “qualified settlement fund.”

### Update on Ownership Restrictions in PG&E Corporation’s Amended Articles

The Plan contemplates that the Fire Victim Trust will be treated as a “qualified settlement fund” for U.S. federal income tax purposes, subject to PG&E Corporation’s ability to elect to treat the Fire Victim Trust as a “grantor trust” for U.S. federal income tax purposes instead. Based on the facts known to date, PG&E Corporation believes that it may be beneficial to elect to treat the Fire Victim Trust as a “grantor trust” for U.S. federal income tax purposes, subject to receipt of certain favorable determinations from the Internal Revenue Service regarding such election.

If PG&E Corporation were to make a “grantor trust” election with respect to the Fire Victim Trust, then any shares owned by the Fire Victim Trust would effectively be excluded from the total number of outstanding equity securities when calculating a person’s percentage ownership for purposes of the 4.75 percent ownership limitation in PG&E Corporation's charter. For example, although PG&E had 1,984,565,829 shares outstanding as of October 20, 2020 for corporate purposes, only 1,506,822,239 shares (the number of outstanding shares of common stock less the number of shares held by the Fire Victim Trust) would count as outstanding for purposes of the ownership restrictions in the Amended Articles. As of October 20, 2020, to the knowledge of PG&E Corporation, the Fire Victim Trust had not sold any shares of PG&E Corporation common stock.

For more information about the ownership restrictions in PG&E Corporation’s Amended Articles, see PG&E Corporation’s and the Utility’s joint quarterly report on Form 10-Q for the period ended June 30, 2020.

### Summary of Changes in Net Income and Earnings per Share

PG&E Corporation’s net income was $83 million and net loss attributable to common shareholders was $1,518 million in the three and nine months ended September 30, 2020, respectively, compared to net losses of $1,619 million and $4,039 million in the same periods in 2019. PG&E Corporation recognized charges of $526 million and $2.0 billion associated with the 2018 Camp fire and 2017 Northern California wildfires, respectively, for the three months ended September 30, 2019, as compared to a charge of $25 million related to the 2019 Kincade fire in the three months ended September 30, 2020. PG&E Corporation recognized charges of $2.4 billion and $4.0 billion associated with the 2018 Camp fire and 2017 Northern California wildfires, respectively, for the nine months ended September 30, 2019, as compared to a charge of $195 million, net of probable insurance recoveries, related to the 2019 Kincade fire during the same period in 2020. Additionally, in the nine months ended September 30, 2020, PG&E Corporation recognized $1.1 billion of expense related to the Backstop Commitment premium and $452 million of expense related to the Additional Backstop Premium Shares, with no similar amounts for the same periods in 2019.

### Key Factors Affecting Financial Results

PG&E Corporation and the Utility believe that their financial condition, results of operations, liquidity, and cash flows may be materially affected by the following factors:

- *The Uncertainties in Connection with Any Future Wildfires, Wildfire Insurance, and AB 1054.* While PG&E Corporation and the Utility cannot predict the occurrence, timing or extent of damages in connection with future wildfires, factors such as environmental conditions (including weather and vegetation conditions) and the efficacy of wildfire risk mitigation initiatives are expected to influence the frequency and severity of future wildfires. To the extent that future wildfires occur in the Utility’s service territory, the Utility may incur costs associated with the investigations of the causes and origins of such fires, even if it is subsequently determined that such fires were not caused by the Utility’s facilities. Although the financial impact of future wildfires could be mitigated through insurance, the Utility may not be able to obtain sufficient wildfire insurance coverage at a reasonable cost, and any such coverage may include limitations that could result in substantial uninsured losses depending on the amount and type of damages resulting from covered events. In July and August 2020, the Utility renewed its liability insurance coverage for wildfire events in the aggregate amount of $867.5 million (subject to an initial self-insured retention of $60 million), comprised of $825 million for the period of August 1, 2020 to July 31, 2021 and $42.5 million in reinsurance for the period of July 1, 2020 through June 30, 2021. Various coverage limitations applicable to different insurance layers could result in material uninsured costs in the future depending on the amount and type of damages resulting from covered events. The Utility will not be able to obtain any recovery from the Wildfire Fund for wildfire-related losses in any calendar year that do not exceed the greater of $1.0 billion in the aggregate and the amount of insurance coverage required under AB 1054. In addition, the policy reforms contemplated by AB 1054 are likely to affect the financial impact of future wildfires on PG&E Corporation and the Utility should any such wildfires occur. The Wildfire Fund would be available to the Utility to pay eligible claims for liabilities arising from future wildfires and would serve as an alternative to traditional insurance products, provided that the Utility satisfies the conditions to the Utility’s ongoing participation in the Wildfire Fund set forth in AB 1054 and that the Wildfire Fund has sufficient remaining funds. (See “Insurance Coverage” in Note 10 of the Notes to the Condensed Consolidated Financial Statements in Item 1.)

However, the impact of AB 1054 on PG&E Corporation and the Utility is subject to numerous uncertainties, including the Utility’s ability to demonstrate to the CPUC that wildfire-related costs paid from the Wildfire Fund were just and reasonable, and whether the benefits of participating in the Wildfire Fund ultimately outweigh its substantial costs. Finally, even if the Utility satisfies the ongoing eligibility and other requirements set forth in AB 1054, for eligible claims against the Utility arising from wildfires that occurred between July 12, 2019 and the Utility’s emergence from Chapter 11 on July 1, 2020, the availability of the Wildfire Fund to pay such claims would be capped at 40% of the amount of such claims. (See “Wildfire Fund under AB 1054” in Note 10 of the Notes to the Condensed Consolidated Financial Statements in Item 1.)

- *The Uncertainties Regarding the Impact of Public Safety Power Shutoffs.* The Utility’s wildfire risk mitigation initiatives involve substantial and ongoing expenditures and could involve other costs. The extent to which the Utility will be able to recover these expenditures and potential other costs through rates is uncertain. The PSPS program, one of the Utility’s wildfire risk mitigation initiatives outlined in the 2019 Wildfire Mitigation Plan, has been the subject of significant scrutiny and criticism by various stakeholders, including the California governor, the CPUC and the court overseeing the Utility’s probation. On November 12, 2019, the CPUC issued an order to show cause against the Utility related to implementation of the October 2019 PSPS events, and on November 13, 2019, the CPUC instituted an OII to examine California’s investor-owned utilities late 2019 PSPS events and to consider enforcement actions. In addition, the PSPS program has had an adverse impact on PG&E Corporation’s and the Utility’s reputation with customers, regulators and policymakers and future PSPS events may increase these negative perceptions. In addition to the 2019 PSPS events, the Utility initiated several PSPS events in September and October of 2020, and expects that additional PSPS events will be necessary in 2020 and future years. (See “Order to Show Cause Against the Utility Related to Implementation of the October 2019 PSPS Events,” “OII to Examine the Late 2019 Public Safety Power Shutoff Events.” and “OIR to Examine Electric Utility De-energization of Power Lines in Dangerous Conditions” in “Regulatory Matters” below.)

In addition, the proposals of SB 378 and AB 1941, which would impose penalties and other requirements on electric utility companies relating to PSPS events, could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. (See “Legislative and Regulatory Initiatives” below.) In addition, on April 13, 2020, a group of local governments and associations filed a Joint Motion for Emergency Order Regarding De-Energization Protocols During the COVID-19 Pandemic, requesting that the CPUC issue an emergency order setting forth de-energization protocols for the Utility and other investor-owned utilities that will remain in place for as long as a State of Emergency or shelter-in-place order remains in effect due to the COVID-19 pandemic. On August 24, 2020, the ALJ in the “OIR to Examine Electric Utility De-energization of Power Lines in Dangerous Conditions” proceedings ruled that the CPUC’s May 28, 2020 Decision, which adopted additional guidelines for de-energization events, had largely addressed the issues raised in the Joint Motion, and held the motion in abeyance. If the motion were reinstated in the future, a CPUC decision could restrict or impose additional requirements on the Utility in implementing PSPS events. (See “OIR to Examine Electric Utility De-energization of Power Lines in Dangerous Conditions” in Regulatory Matters” below.)

- *The Costs and Execution of Other Wildfire Mitigation Efforts.* In response to the wildfire threat facing California, PG&E Corporation and the Utility have taken aggressive steps to mitigate the threat of catastrophic wildfires, the spread of wildfires should they occur and the impact of PSPS events. PG&E Corporation and the Utility incurred approximately $2.6 billion in connection with the 2019 WMP and expect to incur approximately $2.6 billion in 2020 in connection with their 2020-2022 WMP. Although the Utility may seek cost recovery for certain of these expenses and capital expenditures, the Utility has agreed in the Wildfires OII not to seek rate recovery of certain wildfire-related expenses and capital expenditures in future applications in the amount of $1.823 billion.

While PG&E Corporation and the Utility are committed to taking aggressive wildfire mitigation actions, if additional requirements are imposed that go beyond current expectations, such requirements could have a substantial impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows. For example, the Court overseeing the Utility’s probation in connection with the Utility’s federal criminal proceeding has imposed numerous obligations on the Utility related to its business and operations. The success of the Utility’s wildfire mitigation efforts depends on many factors, including on whether the Utility is able to retain or contract for the workforce necessary to execute its wildfire mitigation actions. (See “2020 GRC” below and “Order Instituting Investigation into the 2017 Northern California Wildfires and the 2018 Camp Fire” in Note 11 of the Notes to the Condensed Consolidated Financial Statements in Item 1.)

- *The Timing and Outcome of Ratemaking Proceedings.* The Utility’s financial results may be impacted by the timing and outcome of its 2020 GRC, FERC TO18, TO19, and TO20 rate cases, WMCE application, and its ability to timely recover costs not currently in rates, including costs already incurred and future costs tracked in its CEMA, WEMA, WMPMA, FRMMA, and CPPMA. The outcome of regulatory proceedings can be affected by many factors, including intervening parties’ testimonies, potential rate impacts, the Utility’s reputation, the regulatory and political environments, and other factors. The Utility’s ability to seek cost recovery will also be limited as a result of the outcome of the Wildfires OII. (See Notes 4 and 11 of the Notes to the Condensed Consolidated Financial Statements in Item 1 and “Regulatory Matters” below.)
- *The Impact of the 2019 Kincade Fire*. Claims related to the 2019 Kincade fire will not be discharged in connection with emerging from Chapter 11. On July 16, 2020, Cal Fire issued a press release stating that it had determined that “the Kincade fire was caused by electrical transmission lines owned and operated by Pacific Gas and Electric (PG&E).” Accordingly, if PG&E Corporation or the Utility were determined to be liable for the 2019 Kincade fire, such liabilities could be significant and could exceed the amounts available under applicable insurance policies, which could have a material impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows. As of September 30, 2020, PG&E Corporation and the Utility had recorded a loss of $625 million for the 2019 Kincade fire, which amount corresponds to the lower end of the range of reasonably estimable probable losses. If the liability for the 2019 Kincade fire were to exceed $1.0 billion, it is possible the Utility would be eligible to make a claim to the Wildfire Fund under AB 1054 for such excess amount, subject to a 40% cap on the amount of such claim. As of September 30, 2020, the Utility has also recorded an insurance receivable for $430 million. (See “2019 Kincade Fire” in Note 10 of the Notes to the Condensed Consolidated Financial Statements in Item 1 for more information.)
- *The Impact of the 2020 Zogg Fire and Other 2020 Wildfires.* On October 9, 2020 Cal Fire informed the Utility that it had taken possession of Utility equipment as part of Cal Fire’s ongoing investigation into the 2020 Zogg fire. The investigation is preliminary and Cal Fire has not issued a determination of cause, but if PG&E Corporation or the Utility were determined to be liable for the 2020 Zogg fire, such liabilities could be significant and could exceed the amounts available under applicable insurance policies, which could be expected to have a material impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows. (For more information see Note 10 of the Notes to the Condensed Consolidated Financial Statements in Item 1 of this Form 10-Q.) Apart from the 2020 Zogg fire, there have been numerous wildfires in the Utility’s service territory during the 2020 wildfire season, attributable to various weather conditions (such as lightning, dry conditions, or high winds) and other causes. In addition, the cause of many 2020 wildfires has yet to be determined. If the Utility were alleged or determined to be a cause of one or more of these wildfires, this allegation or determination could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows.
- *The Impact of the COVID-19 Pandemic.* PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows have been and could continue to be significantly affected by the outbreak of COVID-19. The principal areas of near-term impact include liquidity, financial results and business operations, stemming primarily from the ongoing economic hardship of the Utility’s customers, the moratorium on service disconnections for residential and small business customers and an observed reduction in non-residential electrical load. The Utility continues to monitor the overall impact of the COVID-19 pandemic; however, the Utility expects a significant impact on monthly cash collections as long as current circumstances persist. This impact to liquidity may be partially offset by reductions in discretionary spending or potential regulatory impacts. As of September 30, 2020, PG&E Corporation and the Utility had access to approximately $2.6 billion of total liquidity comprised of approximately $140 million of Utility cash, $262 million of PG&E Corporation cash and $2.2 billion of availability under the Utility and PG&E Corporation credit facilities. Other potential impacts of COVID-19 on PG&E Corporation and the Utility include operational disruptions, workforce disruptions, both in personnel availability (including a reduction in contract labor resources) and deployment, delays in production and shipping of materials used in the Utility’s operations may also adversely impact operations, a reduction in revenue due to the cost of capital adjustment mechanism, the potential for higher credit spreads and borrowing costs and incremental financing needs. For more information on the impact of COVID-19 on PG&E Corporation and the Utility, see “PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows could be significantly affected by the outbreak of the COVID-19 pandemic” in Item 1A Risk Factors in Part II.

PG&E Corporation and the Utility expect additional financial impacts in the future as a result of COVID-19. PG&E Corporation and the Utility continue to evaluate the overall impact of COVID-19 and their analysis is subject to change.

- *The Outcome of Other Enforcement, Litigation, and Regulatory Matters, and Other Government Proposals.* The Utility’s financial results may continue to be impacted by the outcome of other current and future enforcement, litigation, and regulatory matters, including those described above as well as the outcome of the Safety Culture OII, the sentencing terms of the Utility’s January 27, 2017 federal criminal conviction, including the oversight of the Utility’s probation and the potential recommendations by the Monitor, and potential penalties in connection with the Utility’s safety and other self-reports. (See Note 11 of the Notes to the Condensed Consolidated Financial Statements in Item 1.) In addition, the Utility’s business profile and financial results could be impacted by the outcome of recent calls for municipalization of part or all of the Utility’s businesses, offers by municipalities and other public entities to acquire the electric assets of the Utility within their respective jurisdictions and calls for state intervention, including the possibility of a state takeover of the Utility. PG&E Corporation and the Utility cannot predict the nature, occurrence, timing or extent of any such scenario, and there can be no assurance that any such scenario would not involve significant ownership or management changes to PG&E Corporation or the Utility, including by the state of California. Further, certain parties filed notices of appeal with respect to the Confirmation Order, including provisions related to the injunction contained in the Plan that channels certain pre-petition fire-related claims to trusts to be satisfied from the trusts’ assets. There can be no assurance that any such appeal will not be successful and, if successful, that any such appeal would not have a material adverse effect on PG&E Corporation and the Utility.

For more information about the risks that could materially affect PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows, or that could cause future results to differ from historical results, see “Item 1A. Risk Factors” in this Form 10-Q and the 2019 Form 10-K. In addition, this quarterly report contains forward-looking statements that are necessarily subject to various risks and uncertainties. These statements reflect management’s judgment and opinions that are based on current estimates, expectations, and projections about future events and assumptions regarding these events and management’s knowledge of facts as of the date of this report. See the section entitled “Forward-Looking Statements” above for a list of some of the factors that may cause actual results to differ materially. PG&E Corporation and the Utility are unable to predict all the factors that may affect future results and do not undertake an obligation to update forward-looking statements, whether in response to new information, future events, or otherwise.

### RESULTS OF OPERATIONS

The following discussion presents PG&E Corporation’s and the Utility’s operating results for the three and nine months ended September 30, 2020 and 2019. See “Key Factors Affecting Financial Results” above for further discussion about factors that could affect future results of operations.

### PG&E Corporation

The consolidated results of operations consist primarily of results related to the Utility, which are discussed in the “Utility” section below. The following table provides a summary of net income (loss) attributable to common shareholders for the three and nine months ended September 30, 2020 and 2019:

*(in millions)*

|  | Three Months Ended September 30, 2020 | 2019 | Nine Months Ended September 30, 2020 | 2019 |
| --- | ---: | ---: | ---: | ---: |
| Consolidated Total | $83 | $(1,619) | $(1,518) | $(4,039) |
| PG&E Corporation | (84) | (6) | (1,656) | (2) |
| Utility | $167 | $(1,613) | $138 | $(4,037) |

PG&E Corporation’s net loss primarily consists of income taxes, interest expense on long-term debt, reorganization items, net, including approximately $1.5 billion in expense related to the Backstop Commitment premium and Additional Backstop Premium Shares in the second quarter of 2020, which is not deductible for tax purposes.

### Utility

The table below shows certain items from the Utility’s Condensed Consolidated Statements of Income for the three and nine months ended September 30, 2020 and 2019. The table separately identifies the revenues and costs that impacted earnings from those that did not impact earnings. In general, expenses the Utility is authorized to pass through directly to customers (such as costs to purchase electricity and natural gas, as well as costs to fund public purpose programs), and the corresponding amount of revenues collected to recover those pass-through costs, do not impact earnings. In addition, expenses that have been specifically authorized (such as energy procurement costs) and the corresponding revenues the Utility is authorized to collect to recover such costs do not impact earnings.

Revenues that impact earnings are primarily those that have been authorized by the CPUC and the FERC to recover the Utility’s costs to own and operate its assets and to provide the Utility an opportunity to earn its authorized rate of return on rate base. Expenses that impact earnings are primarily those that the Utility incurs to own and operate its assets.

*(in millions)*

|  | Three Months Ended September 30, 2020 Revenues/Costs: That Impacted Earnings | That Did Not Impact Earnings | Total Utility | Three Months Ended September 30, 2019 Revenues/Costs: That Impacted Earnings | That Did Not Impact Earnings | Total Utility |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Electric operating revenues | $2,392 | $1,418 | $3,810 | $2,232 | $1,322 | $3,554 |
| Natural gas operating revenues | 896 | 176 | 1,072 | 714 | 164 | 878 |
| **Total operating revenues** | **3,288** | **1,594** | **4,882** | **2,946** | **1,486** | **4,432** |
| Cost of electricity | — | 1,114 | 1,114 | — | 1,070 | 1,070 |
| Cost of natural gas | — | 90 | 90 | — | 68 | 68 |
| Operating and maintenance | 1,877 | 434 | 2,311 | 1,816 | 392 | 2,208 |
| Wildfire-related claims, net of insurance recoveries | 25 | — | 25 | 2,548 | — | 2,548 |
| Wildfire fund expense | 120 | — | 120 | — | — | — |
| Depreciation, amortization, and decommissioning | 845 | — | 845 | 840 | — | 840 |
| **Total operating expenses** | **2,867** | **1,638** | **4,505** | **5,204** | **1,530** | **6,734** |
| **Operating income (loss)** | **421** | **(44)** | **377** | **(2,258)** | **(44)** | **(2,302)** |
| Interest income | 5 | — | 5 | 18 | — | 18 |
| Interest expense | (323) | — | (323) | (52) | — | (52) |
| Other income, net | 57 | 44 | 101 | 13 | 44 | 57 |
| Reorganization items, net | (82) | — | (82) | (69) | — | (69) |
| Income (loss) before income taxes | $78 | $— | $78 | $(2,348) | $— | $(2,348) |
| Income tax benefit (1) |  |  | (92) |  |  | (738) |
| Net income (loss) |  |  | 170 |  |  | (1,610) |
| Preferred stock dividend requirement (1) |  |  | 3 |  |  | 3 |
| **Income (loss) Attributable to Common Stock** |  |  | **$167** |  |  | **$(1,613)** |

(1) These items impacted earnings for the three months ended September 30, 2020 and 2019.

*(in millions)*

|  | Nine Months Ended September 30, 2020 Revenues/Costs: That Impacted Earnings | That Did Not Impact Earnings | Total Utility | Nine Months Ended September 30, 2019 Revenues/Costs: That Impacted Earnings | That Did Not Impact Earnings | Total Utility |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Electric operating revenues | $6,851 | $3,434 | $10,285 | $6,017 | $3,275 | $9,292 |
| Natural gas operating revenues | 2,592 | 844 | 3,436 | 2,300 | 794 | 3,094 |
| **Total operating revenues** | **9,443** | **4,278** | **13,721** | **8,317** | **4,069** | **12,386** |
| Cost of electricity | — | 2,418 | 2,418 | — | 2,506 | 2,506 |
| Cost of natural gas | — | 508 | 508 | — | 515 | 515 |
| Operating and maintenance | 4,937 | 1,484 | 6,421 | 5,071 | 1,181 | 6,252 |
| Wildfire-related claims, net of insurance recoveries | 195 | — | 195 | 6,448 | — | 6,448 |
| Wildfire fund expense | 293 | — | 293 | — | — | — |
| Depreciation, amortization, and decommissioning | 2,574 | — | 2,574 | 2,433 | — | 2,433 |
| **Total operating expenses** | **7,999** | **4,410** | **12,409** | **13,952** | **4,202** | **18,154** |
| **Operating income (loss)** | **1,444** | **(132)** | **1,312** | **(5,635)** | **(133)** | **(5,768)** |
| Interest income | 33 | — | 33 | 61 | — | 61 |
| Interest expense | (764) | — | (764) | (213) | — | (213) |
| Other income, net | 155 | 132 | 287 | 54 | 133 | 187 |
| Reorganization items, net | (286) | — | (286) | (237) | — | (237) |
| Income (loss) before income taxes | $582 | $— | $582 | $(5,970) | $— | $(5,970) |
| Income tax provision (benefit) (1) |  |  | 434 |  |  | (1,943) |
| Net income (loss) |  |  | 148 |  |  | (4,027) |
| Preferred stock dividend requirement (1) |  |  | 10 |  |  | 10 |
| **Income (loss) Attributable to Common Stock** |  |  | **$138** |  |  | **$(4,037)** |

(1) These items impacted earnings for the nine months ended September 30, 2020 and 2019.

### Utility Revenues and Costs that Impacted Earnings

The following discussion presents the Utility’s operating results for the three and nine months ended September 30, 2020 and 2019, focusing on revenues and expenses that impacted earnings for these periods.

### Operating Revenues

The Utility’s electric and natural gas operating revenues that impacted earnings increased by $342 million, or 12%, and $1,126 million, or 14%, in the three and nine months ended September 30, 2020, respectively, compared to the same periods in 2019, primarily due to additional revenues recorded pursuant to the TO20 rate case and cost recovery of capital expenditures related to the 2011-2014 GT&S rate case. In addition, the portion of authorized revenues related to interest expense on pre-petition debt was deferred as a regulatory liability and reduced revenues that impacted earnings during the three and nine months ended September 30, 2019 with no comparable impacts in the same periods in 2020.

### Operating and Maintenance

The Utility’s operating and maintenance expenses that impacted earnings increased by $61 million or 3% in the three months ended September 30, 2020, compared to the same period in 2019, primarily due to $75 million in previously deferred CEMA costs recorded in conjunction with interim rate relief (see “2018 CEMA Application” below) in the three months ended September 30, 2020, with no comparable costs in the same period in 2019. In addition, bad debt expense increased in the three months ended September 30, 2020, as compared to the same period in 2019 as a result of the COVID-19 pandemic. The Utility also experienced increased labor and contract costs in the three months ended September 30, 2020, compared to the same period in 2019. These increases were partially offset by $237 million in disallowed costs for previously incurred capital expenditures in excess of adopted amounts in the 2019 GT&S rate case incurred in the three months ended September 30, 2019, with no corresponding charges during the same period in 2020.

The Utility’s operating and maintenance expenses that impacted earnings decreased by $134 million, or 3%, in the nine months ended September 30, 2020, compared to the same period in 2019, primarily due to a reduction in clean-up costs related to the 2018 Camp fire of $237 million (the Utility recorded $265 million of clean-up and repair costs relating to the 2018 Camp fire incurred in the nine months ended September 30, 2019, compared to $28 million in restoration and rebuild costs related to the 2018 Camp fire in the same period in 2020). Additionally, the Utility recorded $237 million in disallowed costs for previously incurred capital expenditures in excess of adopted amounts in the 2019 GT&S rate case in the nine months ended September 30, 2019, with no corresponding charges during the same period in 2020. These decreases were partially offset by $225 million in previously deferred CEMA costs recorded in conjunction with interim rate relief (see “2018 CEMA Application” below) in the nine months ended September 30, 2020, with no comparable costs in the same period in 2019. In addition, bad debt expense increased in the nine months ended September 30, 2020, as compared to the same period in 2019 as a result of the COVID-19 pandemic. Finally, the Utility incurred $35 million of clean-up and repair costs relating to the 2019 Kincade fire incurred in the nine months ended September 30, 2020, with no comparable charges in the same period in 2019.

### Wildfire-related claims, net of insurance recoveries

Costs related to wildfires that impacted earnings decreased by $2.5 billion, or 99%, in the three months ended September 30, 2020, compared to the same period in 2019. The Utility recognized pre-tax charges of $526 million and $2.0 billion associated with the 2018 Camp fire and 2017 Northern California wildfires, respectively, for the three months ended September 30, 2019, compared to $25 million in pre-tax charges to the 2019 Kincade fire in the three months ended September 30, 2020.

Costs related to wildfires that impacted earnings decreased by $6.3 billion, or 97%, in the nine months ended September 30, 2020, compared to the same period in 2019. The Utility recognized pre-tax charges of $625 million related to the 2019 Kincade fire, partially offset by $430 million in insurance recoveries for the nine months ended September 30, 2020, with no corresponding charges during the same period in 2019. Additionally, the Utility recognized pre-tax charges of $2.4 billion and $4.0 billion associated with the 2018 Camp fire and 2017 Northern California wildfires, respectively, for the nine months ended September 30, 2019, with no corresponding charges during the same period in 2020.

(See “Item 1A. Risk Factors” in the 2019 Form 10-K, as updated in “Item 1A. Risk Factors” in this Form 10-Q, and Note 10 of the Notes to the Condensed Consolidated Financial Statements in Item 1 of this Form 10-Q.)

### Wildfire fund expense

Wildfire fund expense that impacted earnings increased by $120 million, or 100%, and $293 million or 100%, in the three and nine months ended September 30, 2020, respectively, compared to the same periods in 2019. In 2020, the Utility became eligible to participate in the Wildfire Fund and as a result recorded amortization expense related to the Wildfire Fund coverage received from the effective date of AB 1054 through September 30, 2020.

(See Notes 3 and 10 of the Notes to the Condensed Consolidated Financial Statements in Item 1 of this Form 10-Q.)

### Depreciation, Amortization, and Decommissioning

The Utility’s depreciation, amortization, and decommissioning expenses that impacted earnings increased by $5 million, or 1%, and $141 million, or 6%, in the three and nine months ended September 30, 2020, respectively, compared to the same periods in 2019, primarily due to capital additions and an increase in depreciation expense associated with the 2019 GT&S rate case.

### Interest Income

There was no material change to interest income that impacted earnings for the periods presented.

### Interest Expense

Interest expense that impacted earnings increased by $271 million, or 521%, and $551 million, or 259%, in the three and nine months ended September 30, 2020, respectively, compared to the same periods in 2019, primarily due to the cessation of interest accruals on outstanding pre-petition debt in 2019 in connection with the Chapter 11 Cases. In the fourth quarter of 2019, the Utility concluded that interest was probable of being an allowed claim and resumed recording interest on pre-petition debt subject to compromise. Additionally, in the third quarter of 2020, the Utility started recording interest related to new debt issued in connection with emergence from Chapter 11.

### Other Income, Net

Other income, net increased by $44 million, or 338%, and $101 million or 187%, in the three and nine months ended September 30, 2020, respectively, compared to the same periods in 2019, primarily due to lower pension expense resulting from higher than expected return on plan assets.

### Reorganization items, net

Reorganization items, net increased by $13 million, or 19% in the three months ended September 30, 2020, compared to the same period in 2019, primarily due to an increase of $7 million of expenses directly associated with the Utility’s Chapter 11 filing and an decrease in interest income of $6 million.

Reorganization items, net increased by $49 million, or 21% in the nine months ended September 30, 2020, compared to the same period in 2019, primarily due to an increase of $115 million of expenses directly associated with the Utility’s Chapter 11 filing and a decrease in interest income of $28 million, offset by a decrease in DIP financing costs of $94 million.

(See “Item 1A. Risk Factors” in the 2019 Form 10-K and Note 2 of the Notes to the Condensed Consolidated Financial Statements in Item 1 of this Form 10-Q.)

### Income Tax Expense (Benefit)

Income tax benefit decreased by $646 million in the three months ended September 30, 2020, as compared to the same period in 2019, primarily due to a pre-tax loss in 2019 compared to pre-tax income in 2020.

Income tax expense increased by $2.4 billion, in the nine months ended September 30, 2020, as compared to the same period in 2019, primarily due to a write-off of a deferred tax asset associated with the decline in value of PG&E Corporation stock contributed into the Fire Victim’s Trust in 2020. Additionally, there was a pre-tax loss in 2019 compared to pre-tax income in 2020.

The following table reconciles the income tax expense at the federal statutory rate to the income tax provision:

|  | Three Months Ended September 30, 2020 | 2019 | Nine Months Ended September 30, 2020 | 2019 |
| --- | ---: | ---: | ---: | ---: |
| Federal statutory income tax rate | 21.0% | 21.0% | 21.0% | 21.0% |
| Increase (decrease) in income tax rate resulting from: |  |  |  |  |
| State income tax (net of federal benefit) (1) | (17.8)% | 7.5% | 30.9% | 7.6% |
| Effect of regulatory treatment of fixed asset differences (2) | (113.5)% | 2.4% | (48.1)% | 3.8% |
| Bankruptcy and emergence (3) | 1.4% | — | 75.2% | —% |
| Other, net | (8.0)% | 0.5% | (4.5)% | 0.2% |
| **Effective tax rate** | **(116.9)%** | **31.4%** | **74.5%** | **32.6%** |

(1) Includes the effect of state flow-through ratemaking treatment.

(2) Includes the effect of federal flow-through ratemaking treatment for certain property-related costs. For these temporary tax differences, PG&E Corporation and the Utility recognize the deferred tax impact in the current period and record offsetting regulatory assets and liabilities. Therefore, PG&E Corporation’s and the Utility’s effective tax rates are impacted as these differences arise and reverse. PG&E Corporation and the Utility recognize such differences as regulatory assets or liabilities as it is probable that these amounts will be recovered from or returned to customers in future rates. In 2020 and 2019, the amounts also reflect the impact of the amortization of excess deferred tax benefits to be refunded to customers as a result of the Tax Act passed in December 2017.

(3) Includes an adjustment of the measurement of the deferred tax asset associated with the difference between the liability recorded related to the TCC RSA and the ultimate value of PG&E Corporation stock contributed to the Fire Victim Trust.

### Utility Revenues and Costs that Did Not Impact Earnings

Fluctuations in revenues that did not impact earnings are primarily driven by procurement costs. See below for more information.

### Cost of Electricity

The Utility’s cost of electricity includes the cost of power purchased from third parties (including renewable energy resources), transmission, fuel used in its own generation facilities, fuel supplied to other facilities under power purchase agreements, costs to comply with California’s cap-and-trade program, and realized gains and losses on price risk management activities. Cost of electricity also includes net sales (Utility owned generation and third parties) in the CAISO electricity markets. (See Note 8 of the Notes to the Condensed Consolidated Financial Statements in Item 1.) The Utility’s total purchased power is driven by customer demand, net CAISO electricity market activities (purchases or sales), the availability of the Utility’s own generation facilities (including Diablo Canyon and its hydroelectric plants), and the cost-effectiveness of each source of electricity.

*(in millions)*

|  | Three Months Ended September 30, 2020 | 2019 | Nine Months Ended September 30, 2020 | 2019 |
| --- | ---: | ---: | ---: | ---: |
| Cost of purchased power, net | $1,043 | $1,001 | $2,228 | $2,296 |
| Fuel used in generation facilities | 71 | 69 | 190 | 210 |
| **Total cost of electricity** | **$1,114** | **$1,070** | **$2,418** | **$2,506** |

### Cost of Natural Gas

The Utility’s cost of natural gas includes the costs of procurement, storage and transportation of natural gas, costs to comply with California’s cap-and-trade program, and realized gains and losses on price risk management activities. (See Note 8 of the Notes to the Condensed Consolidated Financial Statements in Item 1.) The Utility’s cost of natural gas is impacted by the market price of natural gas, changes in the cost of storage and transportation, and changes in customer demand.

*(in millions)*

|  | Three Months Ended September 30, 2020 | 2019 | Nine Months Ended September 30, 2020 | 2019 |
| --- | ---: | ---: | ---: | ---: |
| Cost of natural gas sold | $56 | $42 | $411 | $433 |
| Transportation cost of natural gas sold | 34 | 26 | 97 | 82 |
| **Total cost of natural gas** | **$90** | **$68** | **$508** | **$515** |

89

### Operating and Maintenance Expenses

The Utility’s operating expenses that did not impact earnings include certain costs that the Utility is authorized to recover as incurred such as pension contributions and public purpose programs costs. If the Utility were to spend more than authorized amounts, these expenses could have an impact to earnings.

### Other Income, Net

The Utility’s other income, net that did not impact earnings includes pension and other post-retirement benefit costs that fluctuate primarily from market and interest rate changes.

### LIQUIDITY AND FINANCIAL RESOURCES

### Overview

As a result of PG&E Corporation’s and the Utility’s emergence from Chapter 11 on July 1, 2020, substantial doubt has been alleviated regarding the Company’s ability to meet its obligations as they become due within one year after the date of the accompanying Condensed Consolidated Financial Statements.

As of and subsequent to the Effective Date, the Utility’s ability to fund operations, finance capital expenditures, make scheduled principal and interest payments, and make distributions to PG&E Corporation depends on the levels of its operating cash flows and access to the capital and credit markets. The CPUC authorizes the Utility’s capital structure, the aggregate amount of long-term and short-term debt that the Utility may issue, and the revenue requirements the Utility is able to collect to recover its cost of capital. The Utility generally utilizes retained earnings, equity contributions from PG&E Corporation and long-term debt issuances to maintain its CPUC-authorized long-term capital structure consisting of 52% equity and 48% debt and preferred stock and relies on short-term debt, including its revolving credit facilities, to fund temporary financing needs. On May 28, 2020, the CPUC approved a final decision in the Chapter 11 Proceedings OII, which, among other things, grants the Utility a temporary, five-year waiver from compliance with its authorized capital structure for the financing in place upon the Utility’s exit from Chapter 11.

PG&E Corporation’s ability to fund operations, make scheduled principal and interest payments, and fund equity contributions to the Utility, depends on the level of cash on hand, cash distributions received from the Utility, and PG&E Corporation’s access to the capital and credit markets.

In 2019, as a result of the initiation of the Chapter 11 Cases, each of Moody’s, Fitch, and S&P withdrew its credit ratings for PG&E Corporation and the Utility. As a result of PG&E Corporation’s and the Utility’s credit ratings ceasing to be rated at investment grade, the Utility was required to post collateral under certain of its commodity purchase agreements and certain other obligations. On June 15, 2020, the agencies re-commenced rating the Utility and PG&E Corporation. The Utility and PG&E Corporation were assigned Ba2, BB, and BB- as their issuer credit ratings by Moody’s, Fitch, and S&P, respectively. Additionally, Moody’s assigned a B1 rating to PG&E Corporation’s Senior Secured debt, a Baa3 rating to the Utility’s Senior Secured debt, and a B1 rating to the Utility’s preferred stock. Fitch assigned a BB rating to PG&E Corporation’s Senior Secured debt, a BBB- rating to the Utility’s Senior Secured debt, and a BB rating to the Utility’s preferred stock. Lastly, S&P assigned a BB- and BBB- rating to PG&E Corporation’s and the Utility’s Senior Secured debt, respectively.

As a result of the outbreak of COVID-19, PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows could continue to be significantly affected. The Utility continues to evaluate the overall impact of the COVID-19 pandemic; however, the Utility expects a significant impact on monthly cash collections as long as current circumstances persist, including the moratorium on service disconnections for residential and small business customers and an observed reduction in non-residential electrical load. The Utility’s customer energy accounts receivable balances over 30 days outstanding as of September 30, 2020, were approximately $696 million, or $310 million higher as compared to the corresponding month in 2019. The Utility is unable to estimate the portion of the increase directly attributable to the COVID-19 pandemic. The Utility expects to continue experiencing an impact on monthly cash collections in 2020 and for as long as current COVID-19 circumstances persist. The reduction in cash collections from customers may be partially offset by reductions in discretionary spending or potential regulatory impacts.

The outbreak of COVID-19 and the resulting economic conditions and government orders have and will continue to have a significant adverse impact on the Utility’s customers and, as a result, these circumstances have and will continue to impact the Utility for an indeterminate period of time. Although the Utility is seeking regulatory relief to mitigate the impact of the consequences of the COVID-19 pandemic, there can be no assurance that any relief is forthcoming or that, if any relief measures are implemented, the timing that any such relief would impact the Utility. On April 16, 2020, the CPUC approved a resolution that authorizes utilities to establish memorandum accounts to track incremental costs associated with complying with the customer protections described within the resolution. On May 1, 2020, the Utility filed an advice letter with the CPUC, describing all reasonable and necessary actions to implement emergency customer protections through April 16, 2021, which was subsequently updated on June 2, 2020, and July 15, 2020, to modify and clarify the filing based on CPUC guidance. On July 27, 2020, the CPUC approved the Utility’s advice letter. (See “Emergency Authorization and Resolution Directing Utilities to Implement Emergency Customer COVID-19 Protections” below for more information.)

### Cash and Cash Equivalents

Cash and cash equivalents consist of cash and short-term, highly liquid investments with original maturities of three months or less. PG&E Corporation and the Utility maintain separate bank accounts and primarily invest their cash in money market funds. In addition to cash and cash equivalents, the Utility holds restricted cash that primarily consists of cash held in escrow to be used to pay bankruptcy related professional fees.

### Financial Resources

### DIP Credit Agreement

In connection with the Chapter 11 Cases, PG&E Corporation and the Utility entered into the DIP Credit Agreement, which received final approval from the Bankruptcy Court on March 27, 2019.

On July 1, 2020, the DIP Facilities were repaid in full and all commitments thereunder were terminated in connection with emergence from Chapter 11.

### Equity Financings

On July 23, 2020, PG&E Corporation sent a notice of termination to the managers of the Amended and Restated Equity Distribution Agreement, dated as of February 17, 2017, effectively terminating the agreement on that date. During the nine months ended September 30, 2020, there were no issuances under this agreement.

In connection with its emergence from Chapter 11, in July 2020, PG&E Corporation issued for gross proceeds of approximately $9.0 billion (i) 423.4 million shares of common stock in the Common Stock Offering, (ii) 342.1 million shares of common stock pursuant to the Investment Agreement, (iii) forward stock purchase contracts to the Backstop Parties pursuant to the Forward Stock Purchase Agreement and (iv) 14.5 million Equity Units in the Equity Unit Offering.

In August 2020, PG&E Corporation issued (i) 1.45 million Equity Units to the Equity Units Underwriters upon their exercise of their over-allotment option to purchase up to 1.45 million additional Equity Units and (ii) 42.3 million shares to the Backstop Parties pursuant to the Forward Stock Purchase Agreements.

The prepaid forward stock purchase contract portion of the Equity Units issued in July and August 2020 represents the right of the unitholders to receive, on the settlement date, between 125 million and 153 million shares, and between 12.5 million and 15.3 million shares, respectively, of PG&E Corporation common stock, based on the value of PG&E Corporation common stock. The common stock received was based on the value of PG&E Corporation common stock over a measurement period specified in the purchase contracts and subject to certain adjustments as provided therein. The settlement date of the purchase contracts is August 16, 2023, subject to acceleration or postponement as provided in the purchase contracts. Such gross proceeds were used to fund distributions under the Plan.

For the nine months ended September 30, 2020, PG&E Corporation made equity contributions to the Utility of $12.9 billion in cash and 477 million shares of PG&E Corporation common stock. Such shares were transferred to the Fire Victim Trust.

For more information, see Note 6 to the Notes to the Condensed Consolidated Financial Statements in Item 1.

### Debt Financings

#### Utility

On June 19, 2020, the Utility completed the sale of (i) $500 million aggregate principal amount of Floating Rate First Mortgage Bonds due June 16, 2022, (ii) $2.5 billion aggregate principal amount of 1.75% First Mortgage Bonds due June 16, 2022, (iii) $1 billion aggregate principal amount of 2.10% First Mortgage Bonds due August 1, 2027, (iv) $2 billion aggregate principal amount of 2.50% First Mortgage Bonds due February 1, 2031, (v) $1 billion aggregate principal amount of 3.30% First Mortgage Bonds due August 1, 2040, and (vi) $1.925 billion aggregate principal amount of 3.50% First Mortgage Bonds due August 1, 2050 (collectively, the “Mortgage Bonds”). The proceeds of the Mortgage Bonds were deposited into an account at The Bank of New York Mellon Trust Company, N.A., as Escrow Agent, which proceeds were held by the Escrow Agent as collateral pursuant to an escrow agreement by and among the Escrow Agent and the Utility. On July 1, 2020, the net proceeds from the sale of the Mortgage Bonds were released from escrow and, together with the net proceeds from certain other Plan financing transactions, were used to effectuate the reorganization of the Utility and PG&E Corporation in accordance with the terms and conditions contained in the Plan.

On the Effective Date, pursuant to the Plan, the Utility issued approximately $11.9 billion of its first mortgage bonds (collectively, the “New Mortgage Bonds”) in satisfaction of certain of its pre-petition senior unsecured debt.

On the Effective Date, pursuant to the Plan, the Utility reinstated approximately $9.6 billion aggregate principal amount of the Utility Reinstated Senior Notes. On the Effective Date, each series of the Utility Reinstated Senior Notes was collateralized by the Utility’s delivery of a first mortgage bond in a corresponding principal amount to the applicable trustee for the benefit of the holders of the Utility Reinstated Senior Notes.

The Mortgage Bonds, the New Mortgage Bonds and the Utility Reinstated Senior Notes are secured by a first lien, subject to permitted liens, on substantially all of the Utility’s real property and certain tangible property related to its facilities. The Mortgage Bonds, the New Mortgage Bonds and the Utility Reinstated Senior Notes are the Utility’s senior obligations and rank equally in right of payment with the Utility’s other existing or future first mortgage bonds issued under the Utility’s mortgage indenture.

On the Effective Date, by operation of the Plan, all outstanding obligations under the Utility Short-Term Senior Notes, the Utility Long-Term Senior Notes and the Utility Funded Debt were cancelled and the applicable agreements governing such obligations were terminated.

For more information, see “Long-Term Debt” in Note 5 to the Notes to the Condensed Consolidated Financial Statements in Item 1.

#### PG&E Corporation

On June 23, 2020, PG&E Corporation obtained a $2.75 billion secured term loan under a term loan credit agreement (“the “Term Loan Agreement”). The Term Loan matures on the date that is five years after June 23, 2020, unless extended by PG&E Corporation pursuant to the terms of the Term Loan Agreement. The proceeds of the Term Loan were deposited into an account at The Bank of New York Mellon Trust Company, N.A., as Escrow Agent, which proceeds were held by the Escrow Agent as collateral pursuant to an escrow agreement by and among the Collateral Agent, the Escrow Agent, the Administrative Agent and PG&E Corporation. On July 1, 2020, the net proceeds from the Term Loan were released from escrow and were used to fund, in part, the transactions contemplated under the Plan.

In accordance with the Term Loan Credit Agreement, PG&E Corporation is required to repay the principal amount outstanding on the Term Loan by $6.875 million on the last day of each quarter.

Additionally, on June 23, 2020, PG&E Corporation completed the sale of (i) $1.0 billion aggregate principal amount of 5.00% Senior Secured Notes due July 1, 2028 and (ii) $1.0 billion aggregate principal amount of 5.25% Senior Secured Notes due July 1, 2030 (collectively, the “Notes”). The proceeds of the Notes were deposited into an account at The Bank of New York Mellon Trust Company, N.A., as Escrow Agent, which proceeds were held by the Escrow Agent as collateral pursuant to an escrow agreement by and amount the Escrow Agent and PG&E Corporation. On July 1, 2020, the net proceeds from the sale of the Notes were released from escrow and, together with the net proceeds from certain other Plan financing transactions, were used to effectuate the reorganization of PG&E Corporation and the Utility in accordance with the terms and conditions contained in the Plan.

For more information, see “Long-Term Debt” in Note 5 to the Notes to the Condensed Consolidated Financial Statements in Item 1.

### Credit Facilities

#### Utility

On July 1, 2020, the Utility entered into a $3.5 billion revolving credit agreement (the “Utility Revolving Credit Agreement”) with JPM, and Citibank, N.A. as co-administrative agents and Citibank, N.A., as designated agent. The Utility Revolving Credit Facility has tenor of three years, subject to two one-year extension options. The proceeds from the Utility Revolving Credit Facility were used in part to fund transactions contemplated under the Plan and are intended to finance working capital needs, capital expenditures and other general corporate purposes of the Utility and its subsidiaries.

In addition, on July 1, 2020, the Utility obtained a $3.0 billion secured term loan under a term loan credit agreement (the “Utility Term Loan Credit Agreement”) with JPM, as administrative agent, and the other lenders from time to time party thereto. The facilities under the Utility Term Loan Credit Agreement consist of a $1.5 billion 364-day term loan facility (the “Utility 364-Day Term Loan Facility”) and a $1.5 billion 18-month term loan facility (the “Utility 18-Month Term Loan Facility”). The maturity date for the Utility 364-Day Term Loan Facility is June 30, 2021 and the maturity date for the Utility 18-Month Term Loan Facility is January 1, 2022. The proceeds from the Utility Term Loan Credit Facility were used to fund transactions contemplated under the Plan.

At September 30, 2020, the Utility had fully drawn on its $3.0 billion term loan credit facilities and had $1.7 billion available under its $3.5 billion revolving credit facility.

For more information, see “Credit Facilities” in Note 5 to the Condensed Consolidated Financial Statements in Item 1.

#### PG&E Corporation

On July 1, 2020, PG&E Corporation entered into a $500 million revolving credit agreement (the “Corporation Revolving Credit Agreement”) with JPM, as administrative agent and collateral agent. The Corporation Revolving Credit Agreement has a maturity date three years after its Effective Date, subject to two one-year extensions at the option of PG&E Corporation. The proceeds from the Corporation Revolving Credit Facility will be used to finance working capital needs, capital expenditures and other general corporate purposes of PG&E Corporation and its subsidiaries.

On the Effective Date, PG&E Corporation repaid and terminated (i) $300 million of outstanding borrowings under the Second Amended and Restated Credit Agreement, dated as of April 27, 2015, among PG&E Corporation, as borrower, the several lenders party thereto and Bank of America, N.A., as administrative agent and (ii) $350 million of borrowings, plus interest, fees and other expenses arising under or in connection with the Term Loan Agreement, dated as of April 16, 2018, among PG&E Corporation, as borrower, the several lenders party thereto and Mizuho Bank Ltd., as administrative agent.

At September 30, 2020, PG&E Corporation did not have any borrowings outstanding under its revolving credit facility.

For more information, see “Credit Facilities” in Note 5 to the Condensed Consolidated Financial Statements in Item 1.

### Accounts Receivable Financing

On October 5, 2020, the Utility, in its individual capacity and in its capacity as initial servicer, entered into an accounts receivable securitization program (the “Receivables Securitization Program”), providing for the sale of a portion of the Utility's accounts receivable to PG&E AR Facility, LLC (the “SPV”), a limited liability company wholly owned by the Utility. Pursuant to the Receivables Securitization Program, the Utility will sell certain of its receivables and certain related rights to payment and obligations of the Utility with respect to such receivables and certain other related rights to the SPV, which, in turn, will obtain loans secured by the receivables from financial institutions (the “Lenders”). The Utility has pledged to the Lenders 100% of the equity interests in the SPV as security for the repayment of the loans. The aggregate principal amount of the loans made by the Lenders cannot exceed $1 billion outstanding at any time.

The loans under the Receivables Securitization Program will bear interest based on a spread over LIBOR dependent on the tranche period thereto and any breakage fees accrued. The receivables financing agreement contains customary LIBOR benchmark replacement language giving the administrative agent, with consent from the SPV as to the successor rate, the right to determine such successor rate. The Receivables Securitization Program contains certain customary representations and warranties and affirmative and negative covenants, including as to the eligibility of the receivables being sold by the Utility and securing the loans made by the Lenders, as well as customary reserve requirements, Receivables Securitization Program termination events, and servicer defaults. The Receivables Securitization Program termination events permit the Lenders to terminate the agreement upon the occurrence of certain specified events, including failure by the SPV to pay amounts when due, certain defaults on indebtedness under the Utility’s credit facility, certain judgments, a change of control, certain events negatively affecting the overall credit quality of transferred receivables and bankruptcy and insolvency events.

The Receivables Securitization Program is scheduled to terminate on October 5, 2022, unless extended or earlier terminated, at which time no further advances will be available and the obligations thereunder must be repaid in full no later than (i) the date that is 180 days following such date or (ii) such earlier date on which the loans under the program become due and payable.

The Utility closed the Receivables Securitization Program on October 5, 2020. As of October 27, 2020, the Utility has obtained $1 billion in loans under the Receivables Securitization Program and the proceeds were primarily used to reduce borrowings outstanding on the Utility Revolving Credit Facility. In general, the proceeds from the sale of the accounts receivable will be used by the SPV to pay the purchase price for accounts receivables it acquires from the Utility and may be used to fund capital expenditures, repay borrowings on the Utility Revolving Credit Facility, satisfy maturing debt obligations, as well as fund working capital needs and other approved uses.

Although PG&E AR Facility, LLC is a wholly owned subsidiary of the Utility whose financial results are consolidated for accounting purposes with the Utility, PG&E AR Facility, LLC is legally separate from the Utility. The assets of PG&E AR Facility, LLC (including the accounts receivables) are not available to creditors of the Utility or PG&E Corporation, and its accounts receivable are not legally assets of the Utility or PG&E Corporation. The Receivables Securitization Program will be accounted for as a secured financing. When amounts are received from the Lenders, the pledged receivables and the corresponding debt will be included in Accounts receivable and Short-term borrowings, respectively, on the Condensed Consolidated Balance Sheets.

### Dividends

On December 20, 2017, the Boards of Directors of PG&E Corporation and the Utility suspended quarterly cash dividends on both PG&E Corporation’s and the Utility’s common stock, beginning the fourth quarter of 2017, as well as the Utility’s preferred stock, beginning the three-month period ending January 31, 2018.

On April 3, 2019, the court overseeing the Utility’s probation issued an order imposing new conditions of probation, including foregoing issuing “any dividends until \[the Utility\] is in compliance with all applicable vegetation management requirements” under applicable law and the Utility’s Wildfire Mitigation Plan.

On March 20, 2020, PG&E Corporation and the Utility filed a Case Resolution Contingency Process Motion with the Bankruptcy Court that includes a dividend restriction for PG&E Corporation. According to the dividend restriction, PG&E Corporation “will not pay common dividends until it has recognized $6.2 billion in non-GAAP core earnings following the Effective Date” of the Plan. The Bankruptcy Court entered the order approving the motion on April 9, 2020.

In addition, the Corporation Revolving Credit Agreement will require that PG&E Corporation (1) maintain a ratio of total consolidated debt to consolidated capitalization of no greater than 70% as of the end of each fiscal quarter and (2) if revolving loans are outstanding as of the end of a fiscal quarter, a ratio of adjusted cash to fixed charges, as of the end of such fiscal quarter, of at least 150% prior to the date that PG&E Corporation first declares a cash dividend on its common stock and at least 100% thereafter.

Under the Utility’s Articles of Incorporation, the Utility cannot pay common stock dividends unless all cumulative preferred dividends on the Utility’s preferred stock have been paid. The Utility’s preferred stock is cumulative and any dividends in arrears must be paid before the Utility may pay any common stock dividends. Additionally, the CPUC requires the Utility to maintain a capital structure composed of at least 52% equity on average. On May 28, 2020, the CPUC approved a final decision in the Chapter 11 Proceedings OII, which, among other things, grants the Utility a temporary, five-year waiver from compliance with its authorized capital structure for the financing in place upon the Utility’s exit from Chapter 11.

Subject to the foregoing restrictions, any decision to declare and pay dividends in the future will be made at the discretion of the Boards of Directors and will depend on, among other things, results of operations, financial condition, cash requirements, contractual restrictions and other factors that the Boards of Directors may deem relevant. As of September 30, 2020, it is uncertain as to when PG&E Corporation and the Utility will commence the payment of dividends on their common stock and when the Utility will commence the payment of dividends on its preferred stock.

For more information on dividends, see “Dividends” in Note 6 to the Condensed Consolidated Financial Statements.

### PG&E Corporation Cash Flows - Holding Company

The PG&E Corporation consolidated cash flows consist primarily of cash flows related to the Utility, which are discussed in the “Utility Cash Flows” section below.

There was no material change to PG&E Corporation’s standalone cash flows from operating and investing activities for the periods presented.

PG&E Corporation’s standalone cash flows from financing activities decreased by $205 million during the nine months ended September 30, 2020, as compared to the same period in 2019. This decrease is due to PG&E Corporation’s cash equity contribution to the Utility of approximately $13 billion and long-term debt repayments of $650 million, with no similar payments made in 2019. This decrease is partially offset by cash received from long-term debt issuances of $4.7 billion, with no similar issuances in 2019, and cash received from common stock and equity units issued of $8.9 billion, as compared to common stock issuances of $85 million in 2019.

Cash provided by or used in financing activities is driven by PG&E Corporation’s standalone financing needs, which depends on the level of cash on hand, cash distributions received from the Utility, access to the capital and credit markets, and the maturity date or prepayment of existing debt instruments.

### Utility Cash Flows

The Utility’s cash flows were as follows:

*(in millions)*

|  | Nine Months Ended September 30, 2020 | 2019 |
| --- | ---: | ---: |
| Net cash provided by (used in) operating activities | $(19,170) | $4,078 |
| Net cash used in investing activities | (5,524) | (4,250) |
| Net cash provided by financing activities | 23,982 | 1,416 |
| **Net change in cash, cash equivalents and restricted cash** | **$(712)** | **$1,244** |

### Operating Activities

The Utility’s cash flows from operating activities primarily consist of receipts from customers less payments of operating expenses, other than expenses such as depreciation that do not require the use of cash. During the nine months ended September 30, 2020, net cash provided by operating activities decreased by $23.2 billion compared to the same period in 2019. This decrease was primarily due to the payment of $18.8 billion in satisfaction of pre-petition wildfire-related claims (including claims associated with the 2018 Camp fire, the 2017 Northern California wildfires, and the 2015 Butte fire), and initial and first annual contributions made to the Wildfire Fund of $5.0 billion, with no similar payments made in 2019.

Future cash flow from operating activities will be affected by various factors, including:

- the timing and amount of costs in connection with the Kincade fire;
- the timing and amount of costs in connection with the 2020 Zogg fire;
- the timing and amounts of costs, including fines and penalties, that may be incurred in connection with current and future enforcement, litigation, and regulatory matters (see “Enforcement and Litigation Matters” in Note 11 of the Notes to the Condensed Consolidated Financial Statements in Item 1 and Part II, Item 1. Legal Proceedings and “Regulatory Matters” below for more information);
- the severity, extent and duration of the global COVID-19 pandemic and its impact on the Utility’s service territory, the ability of the Utility to collect on its customer invoices, the ability of the Utility’s customers to pay their utility bills in full and in a timely manner, the ability of the Utility to offset these effects, including with spending reductions and the ability of the Utility to recover from customers any losses incurred in connection with COVID-19, as well as the impact of COVID-19 on the availability or cost of financing;
- the timing and amounts of annual contributions to the Wildfire Fund and if necessary, the availability of funds to pay eligible claims for liabilities arising from future wildfires;
- the timing and amount of substantially increasing costs in connection with the 2019 and 2020 Wildfire Mitigation Plans that are not currently being recovered in rates (see “Regulatory Matters” below for more information);
- the timing and amount of premium payments related to wildfire insurance (see “Insurance Coverage” in Note 10 of the Notes to the Condensed Consolidated Financial Statements in Item 1 for more information);
- the timing of and amount of the gain to be returned to customers from the sale of the SFGO; and
- the timing and outcomes of the 2020 GRC, FERC TO18, TO19 and TO20 rate cases, 2018 and 2019 CEMA applications, WEMA application, WMCE application, future applications for cost recovery of amounts recorded to the FRMMA, CPPMA and WMPMA, future cost of capital proceedings and other ratemaking and regulatory proceedings.

### Investing Activities

Net cash used in investing activities increased by $1.3 billion during the nine months ended September 30, 2020 as compared to the same period in 2019 partially due to the payment of pre-petition vendor payables for capital expenditures as a result of emerging from Chapter 11. The Utility’s investing activities primarily consist of the construction of new and replacement facilities necessary to provide safe and reliable electricity and natural gas services to its customers. Cash used in investing activities also includes the proceeds from sales of nuclear decommissioning trust investments which are largely offset by the amount of cash used to purchase new nuclear decommissioning trust investments. The funds in the decommissioning trusts, along with accumulated earnings, are used exclusively for decommissioning and dismantling the Utility’s nuclear generation facilities.

Cash paid by the Utility for capital expenditures was approximately $6.3 billion in 2019. Future cash flows used in investing activities are largely dependent on the timing and amount of capital expenditures. The Utility estimates that it will incur approximately $7.5 billion in capital expenditures in 2020 and between $7.6 billion and $8.2 billion in 2021. Additionally, future cash flows from investing activities will be impacted by the timing of and amount received from the sale of the SFGO.

### Financing Activities

Net cash provided by financing activities increased by $22.6 billion during the nine months ended September 30, 2020 as compared to the same period in 2019. This increase was primarily due to PG&E Corporation making a cash equity contribution to the Utility of approximately $13 billion and due to the Utility receiving $8.8 billion in proceeds from the issuance of first mortgage bonds, with no similar activity in 2019. Additionally, the Utility had net borrowings of $940 million under its revolving credit facility during the nine months ended September 30, 2020, with no similar activity in 2019 due to the Utility entering into the revolving credit agreement on July 1, 2020.

Cash provided by or used in financing activities is driven by the Utility’s financing needs, which depend on the level of cash provided by or used in operating activities, the level of cash provided by or used in investing activities, the conditions in the capital markets, and the maturity date or prepayment of existing debt instruments.

### ENFORCEMENT AND LITIGATION MATTERS

PG&E Corporation and the Utility have significant contingencies arising from their operations, including contingencies related to the enforcement and litigation matters described in Notes 10 and 11 of the Notes to the Condensed Consolidated Financial Statements in Item 1 and matters described in “Part II. Other Information, Item 1. Legal Proceedings” below. The outcome of these matters, individually or in the aggregate, could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. In addition, PG&E Corporation and the Utility are involved in other enforcement and litigation matters described in the 2019 Form 10-K and “Part II. Other Information, Item 1. Legal Proceedings.”

### U.S. District Court Matters and Probation

On August 9, 2016, the jury in the federal criminal trial against the Utility in the United States District Court for the Northern District of California, in San Francisco, found the Utility guilty on one count of obstructing a federal agency proceeding and five counts of violations of pipeline integrity management regulations of the Natural Gas Pipeline Safety Act. On January 26, 2017, the court imposed a sentence on the Utility in connection with the conviction. The court sentenced the Utility to a five-year corporate probation period, oversight by the Monitor for a period of five years, with the ability to apply for early termination after three years, a fine of $3 million to be paid to the federal government, certain advertising requirements, and community service.

The probation includes a requirement that the Utility not commit any local, state, or federal crimes during the probation period. As part of the probation, the Utility has retained the Monitor at the Utility’s expense. The goal of the Monitor is to help ensure that the Utility takes reasonable and appropriate steps to maintain the safety of its gas and electric operations, and to maintain effective ethics, compliance and safety related incentive programs on a Utility-wide basis.

Upon the court’s request, on March 2, 2020, the Utility provided to the court its target number of contract tree trimmers for 2020, information regarding the Utility’s 2019 inspections of Tower 009/081 on the Cresta-Rio Oso 230 kV Transmission Line (the “Cresta-Rio Oso Line”), information regarding the relationship between priority codes set forth in the Utility’s Electric Transmission Preventive Maintenance Manual and the safety factors specified in General Order 95 promulgated by the CPUC, as well as the application of each to the C-hooks of interest on the Cresta-Rio Oso Line. In addition, on April 2, 2020, the Utility submitted a report to the court regarding the Utility’s March 19, 2020 collection of equipment from the Cresta-Rio Oso Line. On April 10, 2020, the TCC in the Utility’s Chapter 11 Cases and estimation proceedings filed a declaration from a TCC expert concerning Cresta-Rio Oso 230kV Transmission Line evidence collection and removal on March 19, 2020.

On April 29, 2020, the court issued an order imposing new conditions of probation.

On May 13, 2020, the Utility filed motions with the court asking that it reconsider the April 29, 2020 order and issue a stay on implementing the new conditions until it has had a chance to rule on the Utility’s request for reconsideration.

On May 14, 2020, the court issued an order staying the April 29, 2020 order and ordering certain other procedural actions. On June 24, 2020, after a hearing on the Utility’s motion for reconsideration, the Utility filed a joint brief with the Monitor overseeing its probation and the Department of Justice, outlining which actions, if any, the court should take regarding the conditions of the Utility’s probation. On July 1, 2020, the court issued a notice inviting comments from “any interested party . . . on whether and the extent to which these joint proposed probation conditions should be accepted.” One interested party filed comments on July 16, 2020, stating that the proposed probation conditions submitted by the joint parties were inadequate and should be rejected by the court. The CPUC also filed comments indicating it did not oppose the conditions agreed to by the Utility, the Monitor, and the Department of Justice.

On June 17, 2020, the court issued an order requiring the Utility to respond to each statement in the Butte County District Attorney’s report filed in the criminal prosecution of the Utility in connection with the 2018 Camp Fire entitled “People’s Statement of Factual Basis in Support of the Pleas and Sentencing Statement” that the Utility denies is true and provide the reason for the denial. The Utility filed its response on July 1, 2020.

On July 21, 2020, the court issued an order requiring the Utility, the Monitor, and the Department of Justice to clarify certain aspects of the proposed additional conditions of probation set forth in the June 24, 2020 joint submission. The Utility filed its response on July 28, 2020.

On July 24, 2020, the Utility submitted a report to the court to update the court on the condition of the Utility’s Caribou-Palermo 115 kV Transmission Line (the “Caribou-Palermo Line”). The Utility indicated in its report that energized lines in the same vicinity as the Utility’s de-energized Caribou-Palermo Line may have the potential to induce voltage and current onto the Caribou-Palermo line, despite the Caribou-Palermo line’s de-energized state. The Utility further indicated in its report the steps it has taken to mitigate this risk and additional steps that it will be taking in the future. The Utility also has notified the Monitor, its probation officer, the CPUC and the Butte County District Attorney of the facts and mitigation efforts set forth in its report.

On August 7, 2020, the court entered an order withdrawing the conditions of probation proposed in its April 29, 2020 order and adopting the new conditions jointly proposed by the Utility, the Monitor, and the Department of Justice on June 24, 2020. Among other things, these conditions require the Utility to staff an in-house vegetation inspection manager and approximately 30 additional field inspectors to oversee vegetation management work. Further, the Utility is required to implement a program to assess the age and expected useful life of certain electrical components in high fire-threat areas, incorporate this information into its risk-based asset management programs, and provide monthly progress reports to the Monitor. The Utility must also hire additional inspectors to oversee inspections of its transmission assets and implement a 90-day replacement requirement for cold end hardware in high fire-threat areas with an observed material loss approaching 50 percent.

On October 12, 2020, the court entered an order requesting that the Utility explain its role in the ignition of the 2020 Zogg fire. Regarding the Utility’s equipment removed by Cal Fire as part of Cal Fire’s investigation into the 2020 Zogg fire, the court ordered the Utility to describe, among other things, the location of the equipment when it was in use; whether the equipment was transmission line equipment, distribution line equipment, or substation equipment; and the extent of trimmed and untrimmed vegetation in the area near where Cal Fire took possession of the equipment.

On October 21, 2020, the court entered an additional order related to the 2020 Zogg fire, requesting that the Utility: (1) supply all documents, emails, text messages, reports, voicemails and any other materials related to “the decision to leave energized the line or circuit in question that possibly led to the Zogg Fire”; (2) identify the officer or other employee who made the decision to leave such line energized; (3) identify all others with any role in the decision or recommendation to leave such line energized; (4) describe “the sequence of all events that possibly relate to PG&E’s involvement in the ignition of the Zogg Fire” in chronological order; and (5) provide photographs or videos of the relevant scene. The Utility filed its response to both orders on October 26, 2020, including a detailed, chronologically ordered sequence of events potentially related to the 2020 Zogg fire.

On October 16, 2020, the federal Monitor overseeing the Utility’s probation filed a letter with the court, responding to the court’s “request for an update on the Monitor team’s field inspections of \[the Utility’s\] vegetation management and infrastructure inspection operations since last year.” On October 20, 2020, the court entered an order noting that “\[t\]he Monitor has found more exceptions per mile this year than from September to December of last year” and that “as of August 31, 2020, \[the Utility\] failed to conduct any enhanced, ignition-based climbing inspections of the 967 applicable transmission structures selected for 2020 inspections in high-fire threat districts.” The court requested that the Utility “explain these shortcomings and any other points in the Monitor’s letter it wishes to address” by November 3, 2020.

On October 26, 2020, the court entered an additional order related to the 2020 Zogg fire, requesting that the Utility “state the extent to which the line in question had been cleared of vegetation within the last five years and the extent to which its records or its contractor records showed there was any vegetation that needed to be cut, but was not yet cut in the general area where equipment was seized by authorities.” The Utility included information responsive to the October 26, 2020 order in its response submitted that day and plans to provide a supplemental response with additional information responsive to the October 26, 2020 order at a future date.

For more information on the Utility’s probation, see the 2019 Form 10-K.

The Utility expects to receive additional orders from the court in the future.

### REGULATORY MATTERS

The Utility is subject to substantial regulation by the CPUC, the FERC, the NRC and other federal and state regulatory agencies. The resolutions of the proceedings described below, and other proceedings may materially affect PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. Discussed below are significant regulatory developments that have occurred since filing the 2019 Form 10-K.

### Rate Cases

### 2020 Cost of Capital Proceeding

On December 19, 2019, the CPUC approved a final decision in the 2020 Cost of Capital proceeding, maintaining the Utility’s return on common equity at the 2019 level of 10.25% for the three-year period beginning January 1, 2020, as compared to 12% requested by the Utility. The Utility’s annual cost of capital adjustment mechanism also remains unchanged. The cost of capital adjustment mechanism can trigger changes in the Utility’s authorized ROE and cost of debt, if the 12-month average Moody’s Baa bond rate for the period ending September 30, 2020 were to be 100 basis points higher or lower than 4.5 percent (the benchmark). The adjustment to i) ROE would be one-half the basis point change in the bond rate from the benchmark, and ii) authorized cost of debt would be updated. The decision maintains the common equity component of the Utility’s capital structure at 52%, as requested by the Utility, and reduces its preferred stock component from 1% to 0.5%, also as requested by the Utility. The decision also approves the cost of debt requested by the Utility.

On May 28, 2020, the CPUC issued a decision in the OII to Consider PG&E Corporation’s and the Utility’s Plan of Reorganization that directed the Utility to submit an Advice Letter to update its authorized cost of debt within 30 days of the Effective Date of the Plan. On July 22, 2020, the Utility submitted an Advice Letter requesting to update the authorized cost of long-term debt to implement the interest cost savings resulting from the Utility’s exit financing. On August 20, 2020, the CPUC approved the Utility’s request to update the authorized cost of long-term debt from 5.16%, as authorized in December 2019, to 4.17% effective July 1, 2020.

For additional information, see the 2019 Form 10-K.

### 2017 General Rate Case

As previously disclosed, on September 13, 2019 the Utility submitted an advice letter containing a revised computation of its revenue requirement due to the effects of the Tax Act, which indicated a $282 million net reduction to the 2018 revenue requirement and a $291 million net reduction to the 2019 revenue requirement. The revised gas revenue requirements increased by $21 million and $11 million for years 2018 and 2019, respectively, and the revised electric revenue requirements decreased by $304 million and $302 million for years 2018 and 2019, respectively. On October 17, 2019, the CPUC approved the Utility’s advice letter. The Utility incorporated the gas revenue requirement increases into rates through its Annual Gas True-up advice letter beginning on January 1, 2020 and amortized over 12 months. The Utility incorporated the electric revenue requirement reductions into rates through its Annual Electric True-up advice letter beginning on May 1, 2020. The revenue requirement reduction of $175 million related to electric generation is amortized over 12 months and the 2018 revenue requirement reduction of $215 million related to electric distribution is amortized over 10 months. The Utility will incorporate the remaining 2019 revenue requirement reduction of $216 million related to electric distribution with other anticipated changes, such as the change in revenue requirement resulting from the 2020 GRC phase one decision. The IRS is expected to provide additional guidance on the average rate assumption method. This IRS guidance may impact the Utility’s calculation of the related revenue requirement. It is uncertain when the IRS guidance may be issued.

For additional information, see the 2019 Form 10-K.

### 2020 General Rate Case

On October 23, 2020, the assigned ALJs issued a PD in the Utility’s 2020 GRC proceeding. In this proceeding, the CPUC will determine the annual amount of base revenues (or “revenue requirements”) that the Utility will be authorized to collect from customers for electric distribution, natural gas distribution, and electric generation operations from 2020 through 2022. In the 2020 GRC proceedings, the CPUC will also provide the Utility an opportunity to earn its authorized rate of return.

The PD proposes to adopt most of the provisions in the settlement agreement that the Utility, together with the Public Advocates Office of the California Public Utilities Commission, TURN, CUE, SED and certain other settling parties jointly submitted to the CPUC on December 20, 2019 (the “settlement agreement”). The PD also proposes several modifications, including reduction of the Community Wildfire Safety Program (the “CWSP”) capital forecasts for 2021 and 2022. The PD includes less favorable procedural requirements for recovery of undercollections tracked by certain regulatory accounts and for closure of up to 10 customer service branch offices.

#### Revenue Requirements and Attrition Year Revenues

The PD proposes that the Utility’s 2019 authorized revenue requirement of $8.5 billion be increased by $585 million, effective January 1, 2020, to $9.102 billion, as requested in the settlement agreement. The PD revises the revenue requirement for 2021 and 2022 by reducing the Utility’s capital expenditure forecast for wildfire mitigation stated in the settlement agreement for 2021 and 2022. The PD provides for an additional increase of $339 million in 2021 to the authorized 2020 revenue requirement, or a 3.7% increase, and an additional increase of $344 million in 2022, or a 3.6% increase, as shown in the table below.

| (in millions) Year Revenue Requirement | Increase Proposed in the Settlement (1) | Increase Recommended in the PD | Difference: Increase (Decrease) from the Settlement |
| --- | ---: | ---: | ---: |
| 2020 | $585 | $585 | $— |
| 2021 | 316 | 339 | 23 |
| 2022 | $364 | $344 | $(20) |

(1) The settlement and PD amounts reflect the requirement to exclude certain capital expenditures for wildfire mitigation from the Utility’s rate base pursuant to Assembly Bill (AB) 1054 and reflect a $10 million increase in 2020 revenues over the $575 million included in the settlement agreement as a result of updating for 2018 recorded capital additions, as stipulated in the settlement agreement.

The PD proposes to adopt the revenue requirements for lines of business and cost categories proposed for 2020 in the settlement agreement. The following table shows the revenue requirements proposed in both the settlement agreement and the PD by line of business and cost category, as well as the differences between the 2019 authorized revenue requirements and the amounts in the settlement agreement adopted in the PD.

| (in millions) Lines of Business: | Amounts Proposed in Settlement Agreement and in the PD | Increase / (Decrease) 2019 Amounts vs. Settlement Agreement and the PD |  |
| --- | ---: | ---: | ---: |
| Electric distribution | $4,800 | $436 | 10.0% |
| Gas distribution | 2,013 | 51 | 2.6% |
| Electric generation | $2,289 | $98 | 2.5% |
| **Total revenue requirements** | **$9,102** | **$585** | **6.9%** |
| **Cost Category:** |  |  |  |
| Operations and maintenance | $2,073 | $128 |  |
| Customer services | 277 | (61) |  |
| Administrative and general | 1,203 | 250 |  |
| Less: Revenue credits | (195) | (43) |  |
| Franchise fees, taxes other than income, and other adjustments | 214 | 33 |  |
| Depreciation (including costs of asset removal), return, and income taxes | 5,530 | 278 |  |
| **Total revenue requirements** | **$9,102** | **$585** |  |

While the PD would adopt most of the settlement agreement, it proposes changes to the cost recovery process proposed in the settlement agreement for liability insurance, vegetation management and wildfire mitigation that are less favorable, by requiring that the Utility file applications for recovery of costs above 130% of the authorized amounts instead of addressing such costs in an advice letter. In addition, the PD proposes reductions to wildfire mitigation capital in the CWSP to $603 million for each of 2021 and 2022, as compared to $931 million in 2021 and $1.15 billion in 2022 proposed in the settlement agreement.

#### Rate Base and Capital Additions

The PD proposes the 2019 weighted-average rate base of $27.7 billion to be increased by $1.7 billion, effective January 1, 2020, to $29.5 billion, or a 6.2% increase. The PD revises weighted average rate base amounts for 2021 and 2022, providing for a rate base of $30.9 billion in 2021, a 5.1% increase, and $32.7 billion in 2022, or a $5.5% increase, as shown in the table below. The rate base amounts for 2020 through 2022 proposed in the PD include $1.95 billion in total of forecast capital spend that will not earn an equity return, pursuant to AB 1054, or $147 million for August to December 2019, and $601 million for each of 2020, 2021 and 2022. (The rate base amounts proposed in the settlement agreement included $147 million for August to December 2019, $601 million for 2020, $930 million for 2021 and $1.15 billion for 2022, for a total of $2.83 billion in forecast capital spend without an equity return.)

| (in millions) Year Rate Base | Increase Proposed in the Settlement | Increase Recommended in the PD | Difference: Increase (Decrease) from the Settlement |
| --- | ---: | ---: | ---: |
| 2020 | $1,717 | $1,717 | $— |
| 2021 | 1,603 | 1,493 | (110) |
| 2022 | $1,989 | $1,716 | $(273) |

Over the 2020-2022 GRC period, the PD provides average annual capital investments of approximately $4.3 billion in electric distribution, natural gas distribution and electric generation infrastructure, as compared to $4.5 billion in the settlement agreement. (While the settlement agreement proposed overall revenue requirement increases for 2021 and 2022, it did not specify capital expenditures for those years.)

Consistent with the Utility’s GRC application, the settlement agreement did not propose funding for claims resulting from the 2017 Northern California wildfires or the 2018 Camp fire. Also, the Utility did not seek recovery of compensation of PG&E Corporation’s and the Utility’s officers.

The CPUC could vote on the PD no earlier than at its meeting scheduled for December 3, 2020. Settling parties’ notice to accept the PD or motion protesting the changes to the settlement are due 15 days after the date the Commission formally issues its final decision.

On June 30, 2020, the Utility filed the 2020 Risk Assessment Mitigation Phase Report.

In accordance with a January 16, 2020 CPUC decision in its OIR to Develop a Risk-Based Decision-Making Framework to Evaluate Safety and Reliability Improvements and Revise the GRC Plan the decision, the Utility is required to file with the CPUC on June 30, 2021 a single “general rate case” application requesting integrated GRC and GT&S related revenue requirements for test year 2023 and three attrition years.

For additional information, see the 2019 Form 10-K.

### 2015 Gas Transmission and Storage Rate Case

As previously disclosed, in its final decisions in the Utility’s 2015 GT&S rate case, the CPUC excluded from rate base $696 million of capital spending in 2011 through 2014. This was the amount forecast to be recorded in excess of the amount adopted in the 2011 GT&S rate case. The decision permanently disallowed $120 million of that amount and ordered that the remaining $576 million be subject to an audit overseen by the CPUC staff, with the possibility that the Utility may seek recovery in a future proceeding. The audit report was released June 2, 2020 and did not result in any additional disallowances. The 2015 GT&S decision authorized the Utility to seek recovery of costs not otherwise disallowed through a separate application upon completion of the audit. On July 31, 2020, the Utility filed an application seeking recovery of $512 million (on a recorded basis). On October 16, 2020, the assigned commissioner issued a scoping memo establishing the scope and schedule for the proceeding. The scoping memo requires the Utility to provide supplemental testimony on January 20, 2021 addressing the reasonableness of the capital expenditures. The scoping memo calls for the issuance of a proposed decision in the fourth quarter of 2021.

As previously disclosed, as a result of the Tax Act, on October 17, 2019, the CPUC approved the Utility’s advice letter including a revised computation of the effects of the Tax Act on the revenue requirements, resulting in a $61 million reduction to the 2018 revenue requirement. The Utility incorporated the revenue requirement reduction into rates through its Annual Gas True-up advice letter beginning January 1, 2020 and amortized over 12 months. The IRS is expected to provide additional guidance on the average rate assumption method. This IRS guidance may impact the Utility’s calculation of the related revenue requirement. It is uncertain when the IRS guidance may be issued.

For additional information, see the 2019 Form 10-K.

### 2019 Gas Transmission and Storage Rate Case

As previously disclosed, on September 12, 2019, the CPUC voted out the final decision in the 2019 GT&S rate case of the Utility. By approving the decision, the CPUC adopted a 2019 revenue requirement of $1.332 billion compared to the Utility’s (revised) request of $1.485 billion. This corresponds to an increase of $31 million over the Utility’s 2018 authorized revenue requirement of $1.301 billion, compared to the $184 million increase requested by the Utility. The CPUC also adopted revenue requirements of $1.432 billion for 2020, $1.516 billion for 2021, and $1.580 billion for 2022, compared to the Utility’s request of $1.595 billion for 2020, $1.693 billion for 2021, and $1.679 billion for 2022.

As previously disclosed, on January 16, 2020, the CPUC approved a final decision in its OIR to Develop a Risk-Based Decision-Making Framework to Evaluate Safety and Reliability Improvements and Revise the GRC Plan, as a result of which the Utility will be required to combine the GRC and GT&S rate cases starting with the 2023 GRC. In accordance with the decision, on June 30, 2021, the Utility is required to file with the CPUC a single “general rate case” application requesting integrated GRC and GT&S related revenue requirements for test year 2023 and three attrition years.

For additional information, see the 2019 Form 10-K.

### Transmission Owner Rate Cases

#### Transmission Owner Rate Cases for 2015 and 2016 (the “TO16” and “TO17” rate cases, respectively)

As previously disclosed, on January 8, 2018, the Ninth Circuit Court of Appeals issued an opinion granting an appeal of FERC’s decisions in the TO16 and TO17 rate cases that had granted the Utility a 50-basis point ROE incentive adder for its continued participation in the CAISO. If FERC concluded on remand that the Utility should no longer be authorized to receive the 50 basis point ROE incentive adder, the Utility would incur a refund obligation of $1 million and $8.5 million for TO16 and TO17, respectively. Those rate case decisions were remanded to FERC for further proceedings consistent with the Court of Appeals’ opinion.

On July 18, 2019, FERC issued its order on remand reaffirming its prior grant of the Utility’s request for the 50-basis point ROE adder. On August 16, 2019, a number of parties filed for rehearing of that order.

On March 17, 2020, FERC issued its order denying the requests for rehearing. On May 11, 2020, the CPUC and a number of other parties filed a petition for review of FERC’s orders in the Ninth Circuit Court of Appeals. Briefing on the appeal will be completed in December 2020. The Utility is unable to predict the timing and outcome of this proceeding.

For additional information, see the 2019 Form 10-K.

#### Transmission Owner Rate Case for 2017 (the “TO18” rate case)

As previously disclosed, on July 29, 2016, the Utility filed its TO18 rate case at the FERC requesting a 2017 retail electric transmission revenue requirement of $1.72 billion, a $387 million increase over the 2016 revenue requirement of $1.33 billion. The forecasted network transmission rate base for 2017 was $6.7 billion. The Utility sought a return on equity of 10.9%, which included an incentive component of 50 basis points for the Utility’s continuing participation in the CAISO. In the filing, the Utility forecasted that it would make investments of $1.30 billion in 2017 in various capital projects.

Also, as previously disclosed, on October 1, 2018, the ALJ issued an initial decision in the TO18 rate case proposing a ROE of 9.13% compared to the Utility’s request of 10.90%, and an estimated composite depreciation rate of 2.96% compared to the Utility’s request of 3.25%. In addition, the ALJ proposed to reduce forecasted capital and expense spending to actual costs incurred for the rate case period. Further, the ALJ proposed to remove certain items from the Utility’s rate base and revenue requirement. Finally, the ALJ rejected the Utility’s direct assignment of common plant to FERC and required the allocation of all common plant between CPUC and FERC jurisdiction be based on operating and maintenance labor ratios. Application of the operating and maintenance labor rates would result in an allocation of 6.15% of common plant to FERC in comparison to 8.84% under the Utility’s direct assignment method. The Utility and intervenors filed initial briefs on October 31, 2018, and reply briefs on November 20, 2018, in response to the ALJ’s initial decision.

On October 15, 2020, FERC issued an order that affirmed in part and reversed in part the initial decision. The order reopens the record for the limited purpose of allowing the participants to the proceeding an opportunity to present written evidence concerning FERC’s revised ROE methodology adopted in FERC Opinion No. 569-A, issued on May 21, 2020, which refined the methodology it established in Opinion No. 569 for setting the ROE that electric utilities are authorized to earn on electric transmission investments. Initial briefs are due 60 days from the date of this decision and responses are due 30 days later. In addition, the order approves depreciation rates that yield an estimated composite depreciation rate of 2.94% compared to the Utility’s request of 3.25%. Further, the order reduces forecasted capital, operations and maintenance, and cost of debt expense to actual costs incurred for the rate case period. Finally, the order rejected the Utility’s direct assignment of common plant to FERC and required the allocation of all common plant between CPUC and FERC jurisdiction be based on operating and maintenance labor ratios. Aside from the ultimate outcome of the common plant allocation and ROE methodology, which is subject to further briefing, FERC’s October 15, 2020 order is not expected to result in a material impact on the Utility’s financial condition, results of operations, liquidity, and cash flows. Some of the issues that will be decided in a final and unappealable TO18 decision, including the common plant allocation, will also be incorporated into the Utility’s current formula rate, described below under the TO20 rate case.

In addition to the additional return on equity briefing, the order is subject to requests for rehearing and potential appellate review of any rehearing order. The Utility is unable to predict the timing and outcome of this proceeding.

For additional information, see the 2019 Form 10-K.

#### Transmission Owner Rate Case for 2018 (the “TO19” rate case)

As previously disclosed, on July 27, 2017, the Utility filed its TO19 rate case at the FERC requesting a 2018 retail electric transmission revenue requirement of $1.79 billion, a $74 million increase over the proposed 2017 revenue requirement of $1.72 billion. The forecasted network transmission rate base for 2018 was $6.9 billion. The Utility sought a ROE of 10.75%, which includes an incentive component of 50 basis points for the Utility’s continuing participation in the CAISO. In the filing, the Utility forecasted capital expenditures of approximately $1.4 billion.

Also, as previously disclosed, on September 21, 2018, the Utility filed an all-party settlement with the FERC in connection with TO19. As part of the settlement, the TO19 revenue requirement will be set at 98.85% of the revenue requirement for TO18 that will be determined upon the issuance of a final, non-appealable TO18 decision. Additionally, if the Court of Appeals were to determine that the Utility was not entitled to the 50 basis point incentive adder for the Utility’s continued CAISO participation, then the Utility would be obligated to make a refund to customers of approximately $25 million. See Transmission Owner Rate Cases for 2015 and 2016 above for a discussion of the incentive adder. On December 20, 2018, the FERC issued an order approving the all-party settlement.

For additional information, see the 2019 Form 10-K.

#### Transmission Owner Rate Case for 2019 (the “TO20” rate case)

As previously disclosed, on October 1, 2018, the Utility filed its TO20 rate case at FERC requesting approval of a formula rate for the costs associated with the Utility’s electric transmission facilities. On November 30, 2018, the FERC issued an order accepting the Utility’s October 2018 filing, subject to hearings and refund, and established May 1, 2019 as the Effective Date for rate changes. FERC also ordered that the hearings will be held in abeyance pending settlement discussions among the parties.

The formula rate replaces the “stated rate” methodology that the Utility used in its previous TO rate case filings. The formula rate methodology still includes an authorized revenue requirement and rate base for a given year, but it also provides for an annual update of the following year’s revenue requirement and rates in accordance with the terms of the FERC-approved formula. Under the formula rate mechanism, transmission revenue requirements will be updated to the actual cost of service annually as part of the true-up process. Differences between amounts collected and determined under the formula rate will be either collected from or refunded to customers.

The parties conducted several settlement conferences throughout 2019. On March 31, 2020, the Utility filed a partial settlement with FERC that resolves issues regarding the inputs, and methods used in the formula rate consistent with FERC precedent. In addition, the partial settlement establishes a stakeholder transmission asset review process that allows the stakeholders to review transmission capital projects that are not subject to review under the CAISO Transmission Planning Process which would be included in TO rates; allows the Utility to resolve the issue of compliance to reconcile the rate base with the CAISO register data base.

On May 9, 2019, the Utility filed a request with the FERC to modify the formula rate determination of the Utility’s capital structure to address certain non-cash charges related to wildfire liability. The filing was accepted by FERC, subject to hearing and refund, on July 8, 2019 and was consolidated with the TO20 rate case. In addition, on June 30, 2020, the Utility filed another request with the FERC to modify the formula rate determination of the Utility’s capital structure to address certain financing issuances related to the Utility’s emergence from Chapter 11 and requirements of AB 1054. The filing was accepted by FERC, subject to hearing and refund, on August 28, 2020 and was consolidated with the TO20 rate case (together, the “Formula Rate Proceedings”).

On March 31, 2020, the Utility filed a partial settlement with FERC that resolves issues regarding the inputs, and methods used in the formula rate consistent with FERC precedent. In addition, the partial settlement establishes a stakeholder transmission asset review process that allows the stakeholders to review transmission capital projects that are not subject to review under the CAISO Transmission Planning Process which would be included in TO rates; allows the Utility to resolve the issue of compliance to reconcile the rate base with the CAISO register data base; and requires the Utility to seek FERC authorization before recovering claims related to 2017 Northern California wildfires and 2018 Camp fire. The partial settlement was approved by FERC on August 17, 2020.

On October 15, 2020, the Utility filed a settlement with FERC resolving all of the remaining issues in the Formula Rate Proceedings, including the Utility’s ROE, capital structure, depreciation rates, as well as certain other aspects of the Utility’s formula rate. Specifically, the settlement, if approved by FERC, establishes an all-in ROE of 10.45%; a fixed capital structure of 49.75% common stock, 49.75% debt, and 0.5% preferred stock; and fixed depreciation rates for various categories of transmission facilities (represented by individual FERC accounts). The term of the settlement continues until December 31, 2023 and the Utility will be required to file a replacement rate filing to be effective on January 1, 2024. The settlement also requires the Utility to concurrently file a motion for interim rates requesting that the settlement rates go into effect on January 1, 2021 while approval of the settlement is pending at FERC. The settlement also provides that the Utility will make supplemental filings in two FERC dockets addressing the calculation of the Utility’s AFUDC to reflect the terms of the settlement. The two AFUDC dockets have not been consolidated with the Formula Rate Proceedings but include capital structure issues addressed by the settlement.

For additional information, see the 2019 Form 10-K.

### Nuclear Decommissioning Cost Triennial Proceeding

The Utility expects that the decommissioning of Diablo Canyon will take many years after the expiration of its current operating licenses. Detailed studies of the cost to decommission the Utility’s nuclear generation facilities are conducted every three years in conjunction with the NDCTP. Actual decommissioning costs may vary from these estimates as a result of changes in assumptions such as regulatory requirements; technology; and costs of labor, materials, and equipment. The Utility recovers its revenue requirements for decommissioning costs from customers through a non-bypassable charge that the Utility expects will continue until those costs are fully recovered.

As previously disclosed, on December 13, 2018, the Utility submitted its 2018 NDCTP application, which includes a Diablo Canyon site-specific decommissioning cost estimate of $4.8 billion to decommission the Diablo Canyon facilities.

Also, as previously disclosed, on January 10, 2020, the settlement agreement that the parties had reached in this proceeding was filed with the CPUC, along with a joint motion for adoption of the settlement agreement.

Under the proposed settlement agreement, the Utility would collect annual revenue requirements of $112.5 million and $3.9 million for the funding of the Diablo Canyon non-qualified trust and Humboldt Bay tax qualified trust, respectively, commencing January 1, 2020. Additionally, under the proposed settlement agreement, the $398.4 million spent for Humboldt Bay Power Plant decommissioning project costs completed to date would be deemed reasonable.

The Utility is unable to determine the timing and outcome of this proceeding.

For additional information, see the 2019 Form 10-K.

### Application for Wildfire Mitigation and Catastrophic Events Interim Rates

On February 7, 2020, the Utility filed an interim relief application seeking $899 million in interim rates related to certain electric distribution costs recorded in the following memorandum accounts: WMPMA, FRMMA, FHPMA, and CEMA. The costs pertain mainly to the years 2017-2019. The application addresses costs recorded in: (i) the WMPMA and FRMMA to comply with the 2019 WMP and other wildfire mitigation costs not otherwise recoverable through rates, (ii) the FHPMA to comply with various fire safety rulemakings through 2019, and (iii) the CEMA for responding to, and restoring customer service after, certain storms and fires occurring in 2017-2019.

The Utility submitted a request on March 23, 2020, to reduce the interim rate relief by $8.4 million to the proposed revenue requirement. This reduction, which reduces the requested rate relief to $891 million, relates to the capital cost reduction required by Assembly Bill 1054.

On October 22, 2020, the CPUC voted out its final decision that approved interim relief in the amount of $447 million. The Utility will recover these costs over a 17-month period beginning in January 2021.

For additional information, see the 2019 Form 10-K.

### Wildfire Mitigation and Catastrophic Events Costs Recovery Application

On September 30, 2020, the Utility filed an application with the CPUC requesting cost recovery of recorded expenditures related to wildfire mitigation, certain catastrophic events, and a number of other activities (the “WMCE application”). The recorded expenditures exclude amounts disallowed as a result of the CPUC’s decision in the Order Instituting Investigation into the 2017 Northern California Wildfires and the 2018 Camp fire and consist of $1.18 billion in expense and $801 million in capital expenditures, which result in a revenue requirement of approximately $1.28 billion.

The costs addressed in the WMCE application cover activities mainly during the years 2017 to 2019 and are incremental to those previously authorized in the Utility’s 2017 GRC and other proceedings. The majority of costs addressed in this application reflect work necessary to mitigate wildfire risk and to respond to catastrophic events occurring during the years 2017 to 2019. The Utility recorded these costs to the FHPMA of $293 million, the FRMMA of $112 million, the WMPMA of $608 million, and the CEMA of $251 million. The CEMA costs reflected in the application include the Utility’s costs incurred responding to ten catastrophic events, including the 2017 Tubbs fire.

In its application, the Utility proposed the following ratemaking scenario: given the CPUC approval of $447 million in interim rate relief, the Utility proposes to recover the remaining $868 million revenue requirement over a one-year period (following the conclusion of interim rate relief recovery). Cost recovery requested in this application is subject to the CPUC’s reasonableness review.

The Utility has proposed a schedule that would call for a final decision by the CPUC in September 2021.

The Utility is unable to predict the timing and outcome of this application. PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows could be materially affected if the Utility is unable to timely recover costs included in this application.

For more information regarding the FHPMA, the FRMMA, the WMPMA, and the CEMA memorandum accounts, see “Wildfire Mitigation Memorandum Accounts” and “Catastrophic Event Memorandum Accounts and Applications” below.

### Application for Recovery of Costs Recorded in the Wildfire Expense Memorandum Account

On February 7, 2020, the Utility filed an application seeking recovery of certain costs recorded in the WEMA. In the application, the Utility seeks recovery of $498.7 million for the cost of insurance premiums paid by the Utility between July 26, 2017 through December 31, 2019 that is incremental to the insurance costs already authorized in the 2017 GRC or sought to be authorized in rates in the 2020 GRC. These incremental costs are not associated with any specific wildfire event. The application does not seek recovery of wildfire claims or associated legal costs eligible for recording to WEMA. The Utility has proposed a schedule for the proceeding that requests a final decision by the end of 2020 and costs to be recovered in 2021.

On April 2, 2020, the CPUC held a prehearing conference in this matter. The CPUC has yet to issue a scoping memo that would establish the scope and schedule for the proceeding.

### Catastrophic Event Memorandum Accounts and Applications

The CPUC allows utilities to recover the reasonable, incremental costs of responding to catastrophic events that have been declared a disaster or state of emergency by competent federal or state authorities through a CEMA. In 2014, the CPUC directed the Utility to perform additional fire prevention and vegetation management work in response to the severe drought in California. The costs associated with this work are tracked in the CEMA. The Utility’s CEMA applications are subject to CPUC review and approval. For more information see Note 4 of the Notes to the Condensed Consolidated Financial Statements in Item 1.

### 2019 CEMA Application

On September 13, 2019, the Utility submitted to the CPUC its 2019 CEMA application requesting cost recovery of $159.3 million in connection with 13 catastrophic events that included 12 wildfires and one storm for declared emergencies from mid-2017 through 2018. The 2019 CEMA application does not include costs related to the 2015 Butte fire, the 2017 Northern California wildfires, or the 2018 Camp fire.

On June 30, 2020, the Utility reported that it reached a settlement in principle with TURN and the PAO, and asked the ALJ to suspend the scheduled evidentiary hearings and give the parties time to finalize a settlement.

On August 31, 2020 the Utility filed a joint motion on behalf of the settling parties seeking approval and adoption of the settlement agreement. A final decision is expected by the end of 2020.

PG&E Corporation and the Utility are unable to predict the outcome of this proceeding.

### 2018 CEMA Application

On March 30, 2018, the Utility submitted to the CPUC its 2018 CEMA application requesting cost recovery of $183 million in connection with seven catastrophic events that included fire and storm declared emergencies from mid-2016 through early 2017, as well as $405 million related to work performed in 2016 and 2017 to cut back or remove dead or dying trees that were exposed to years of drought conditions and bark beetle infestation.

On April 25, 2019, the CPUC approved the Utility’s request for interim rate relief, allowing for recovery of $373 million of costs (63% of the total costs incurred in 2016 and 2017), compared to $588 million requested by the Utility. The interim rate relief was implemented on October 1, 2019. Costs included in the interim rate relief are subject to audit and refund. On August 7, 2019, the Utility filed a Revised Application, Revised Testimony and Revised Workpapers, reflecting a new revenue requirement request of $669 million, pursuant to CPUC ruling allowing these changes.

The 2018 CEMA application does not include costs related to the 2015 Butte fire, the 2017 Northern California wildfires, or the 2018 Camp fire.

On March 9, 2020, the CPUC issued a modified scoping memo and ruling, requiring the Utility to file by June 30, 2020 a revised application that would include actual 2019 tree mortality costs and an independent auditor to be hired for audit of all vegetation management costs and related interest calculations.

On May 4, 2020, the Utility filed a revised application, which included 2019 tree mortality costs, reflecting a new revenue requirement request of $757 million.

The Utility is unable to predict the timing and outcome of this proceeding.

The Utility requested recovery of costs recorded in the 2018 CEMA in its Wildfire Mitigation and Catastrophic Events Interim Rates Application described above. (See “Wildfire Mitigation and Catastrophic Events Interim Rates Application.”)

For additional information, see the 2019 Form 10-K.

### Wildfire Mitigation Memorandum Accounts

### Fire Hazard Prevention Memorandum Account

The CPUC allows utilities to track and record costs associated with implementing regulations and requirements adopted to protect the public from potential fire hazards associated with overhead power line facilities and nearby aerial communication facilities that have not been previously authorized in another proceeding. The Utility tracked such costs in the FHPMA through the end of 2019.

On December 17, 2019, the Utility, the SED of the CPUC, the CPUC’s Office of the Safety Advocate, and CUE jointly submitted to the CPUC a proposed settlement agreement in connection with the OII into the 2017 Northern California Wildfires and the 2018 Camp Fire. Pursuant to the settlement agreement, the Utility agrees, among other things, to not seek recovery of $36 million of wildfire-related expenses recorded in the FHPMA. For more information on the settlement agreement, see Note 11 of the Notes to the Condensed Consolidated Financial Statements.

Other than the amounts subject to the settlement agreement, as modified by the Decision Different approved on May 7, 2020, in connection with the OII into the 2017 Northern California Wildfires and the 2018 Camp Fire, the Utility believes such costs are recoverable but rate recovery requires CPUC reasonableness review.

The Utility requested recovery of costs recorded in the FHPMA in its Wildfire Mitigation and Catastrophic Events Costs Recovery Application described above. (See “Wildfire Mitigation and Catastrophic Events Costs Recovery Application” above.)

The amount reflected in this memorandum account as of September 30, 2020 was $259 million, see Note 4 of the Notes to the Condensed Consolidated Financial Statements in Item 1.

For additional information, see the 2019 Form 10-K.

### Fire Risk Mitigation Memorandum Account

On March 12, 2019, the CPUC approved the Utility’s FRMMA to track costs incurred beginning January 1, 2019, for fire risk mitigation activities that are not otherwise covered in revenue requirements. The FRMMA was authorized by SB 901 and AB 1054 to capture mitigation costs of activities not included in a CPUC approved Wildfire Mitigation Plan. The Utility has proposed that the FRMMA continue after the approval of its 2019 Wildfire Mitigation Plan to record costs of wildfire mitigation activities that were beyond the initial identified scope of work or are not included in the subsequent wildfire mitigation plans.

On December 17, 2019, the Utility, the SED of the CPUC, the CPUC’s Office of the Safety Advocate, and CUE jointly submitted to the CPUC a proposed settlement agreement in connection with the OII into the 2017 Northern California wildfires and the 2018 Camp fire. Pursuant to the settlement agreement, the Utility agrees, among other things, not to seek recovery of $236 million of wildfire-related expenses recorded in the FRMMA and the WMPMA. For more information on the settlement agreement, see Note 11 of the Notes to the Condensed Consolidated Financial Statements.

The Utility requested recovery of costs recorded in the FRMMA in its Wildfire Mitigation and Catastrophic Events Costs Recovery Application, except for the amounts subject to the settlement agreement, as modified by the Decision Different approved on May 7, 2020, in connection with the OII into the 2017 Northern California wildfires and the 2018 Camp fire. (See “Wildfire Mitigation and Catastrophic Events Costs Recovery Application” above.) PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows could be materially affected if the Utility is unable to timely recover costs in connection with the 2019 WMP recorded in the FRMMA.

The amount reflected in this memorandum account as of September 30, 2020 was $99 million, see Note 4 of the Notes to the Condensed Consolidated Financial Statements in Item 1.

For additional information, see the 2019 Form 10-K.

### Wildfire Mitigation Plan Memorandum Account

As previously disclosed, on June 5, 2019, the Utility submitted an advice letter to establish the WMPMA (also called the Wildfire Plan Memorandum Account) effective May 30, 2019. The purpose of the WMPMA is to track costs incurred to implement the Utility’s Wildfire Mitigation Plans, as required by Public Utilities Code Sections 8386 et seq., as modified by SB 901 and subsequent bills including AB 1054, AB 111, SB 70, SB 167, SB 247, and SB 560. The WMPMA is required to be established upon approval of a utility’s wildfire mitigation plan to track costs incurred to implement the plan. The CPUC approved the memorandum account on August 5, 2019, so the Utility has recorded costs incurred in implementing the Wildfire Mitigation Plan, which was approved May 30, 2019, as of the WMPMA Effective Date, June 5, 2019.

The Utility requested recovery of costs recorded in the WMPMA in its Wildfire Mitigation and Catastrophic Events Costs Recovery Application, except for the amounts subject to the settlement agreement, as modified by the Decision Different approved on May 7, 2020, in connection with the OII into the 2017 Northern California wildfires and the 2018 Camp fire. (See “Wildfire Mitigation and Catastrophic Events Costs Recovery Application” above.) PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows could be materially affected if the Utility is unable to timely recover costs in connection with the 2019 Wildfire Mitigation Plan recorded in the WMPMA.

The amount reflected in this memorandum account as of September 30, 2020 was $1.08 billion, see Note 4 of the Notes to the Condensed Consolidated Financial Statements in Item 1.

For additional information, see the 2019 Form 10-K.

### Emergency Authorization and Order Directing Utilities to Implement Emergency Customer COVID-19 Protections

In response to the COVID-19 pandemic, on April 16, 2020, the CPUC adopted a Resolution ordering utilities to implement a number of emergency customer protections for one year beginning on March 4, 2020 through April 16, 2021, including:

- waive deposit requirements for residential customers seeking to reestablish service for one;
- implement payment plan options for residential customers;
- suspend disconnection for nonpayment and associated fees, waive deposit and late fee requirements for residential and small business customers;
- support low-income residential customers by:
- freezing all standard and high-usage reviews for the CARE program eligibility for 12 months and potentially longer, as warranted;
- contacting all community outreach contractors, the community-based organizations that assist in enrolling hard-to-reach low-income customers into CARE, to help better inform customers of these eligibility changes;
- partnering with the program administrator of the customer funded emergency assistance program for low-income customers and increasing the assistance limit amount for the next 12 months; and
- indicate how the energy savings assistance program can be deployed to assist customers;
- suspend all CARE and Federal Emergency Relief Administration program removals to avoid unintentional loss of the discounted rate during the period for which the customer is protected under these customer protections;
- discontinue generating all recertification and verification requests that require customers to provide their current income information;
- offer repair processing and timing assistance and timely access to utility customers;
- include these customer protections as part of their larger community outreach and public awareness plans;
- meet and confer with the Community Choice Aggregators as early as possible to discuss their roles and responsibilities for each emergency customer protection.

The Resolution also authorizes utilities to establish memorandum accounts to track incremental costs associated with complying with the Resolution.

### COVID-19 Pandemic Protections Memorandum Account

On May 1, 2020, the Utility submitted an advice letter to establish the CPPMA. The purpose of the CPPMA is to track costs incurred to implement the CPUC’s Emergency Authorization and Order Directing Utilities to Implement Emergency Customer Protections to Support California Customers During the COVID-19 Pandemic. Costs included in the CPPMA will include incremental uncollectibles expense for residential and small business customers, incremental accounts receivable financing costs for residential and small business customers, and the costs of complying with various customer protections described in “Emergency Authorization and Order Directing Utilities to Implement Emergency Customer COVID-19 Protections,” above. The Utility intends to seek recovery of the CPPMA balance in a future application, recovery of which will require CPUC reasonableness review.

On June 2, 2020 and July 15, 2020, the Utility submitted updated advice letters to modify and clarify prior proposals based on CPUC guidance. On July 27, 2020, the CPUC approved the Utility’s advice letter.

The amount reflected in this memorandum account as of September 30, 2020 was $53 million, see Note 4 of the Notes to the Condensed Consolidated Financial Statements in Item 1.

### Other Regulatory Proceedings

### Application to Sell General Office Complex

On September 30, 2020, the Utility filed an application with the CPUC to authorize it to sell its San Francisco General Office headquarters complex (the “SFGO”) located at 215 Market Street, 245 Market Street, 77 Beale Street, 50 Main Street, 25 Beale Street, and 45 Beale Street in downtown San Francisco, and relocate and consolidate this site and certain East Bay office locations into a single Bay Area corporate headquarters located at 300 Lakeside Drive in Oakland (the “Lakeside Building”), and for appropriate ratemaking treatment of those transactions.

According to this application, the Utility proposes the SFGO sale and headquarters transition proceed in several interrelated steps: the Utility will enter into the lease, with an option to purchase, the Lakeside Building; the Utility will initiate the sale process for, and ultimately sell, the SFGO, subject to CPUC approval; the Utility will enter into an agreement with the buyer of the SFGO to lease back space during the multi-year relocation period; and as space in the Lakeside Building becomes available following the expiration of existing tenants’ leases and completion of the redevelopment of the property to the Utility’s specifications, the Utility will relocate employees and operations from the SFGO and certain East Bay office locations to the Lakeside Building in phases over several years, beginning in 2022 (collectively, the “Transactions”).

In this application, the Utility requests that the CPUC: (i) authorize the Utility to sell the SFGO; (ii) approve the Utility’s proposal to distribute all of the gain on sale of the SFGO to customers on an annual basis over a period of five years, beginning in 2022; (iii) determine that the Transactions are reasonable, and authorize the Utility to recover (a) the costs of exercising the option to purchase the Lakeside Building and include the costs in rate base; (b) the costs of leasing necessary space in both the SFGO and in the Lakeside Building during the transition period (with the SFGO leased space decreasing as the Lakeside Building space increases); and (c) other transition and/or transaction-related costs, in accordance with the ratemaking treatment requested; and (iv) establish a balancing account to record lease payments, net savings or costs on operating expense and capital expense, gain on sale, moving costs and related costs for inclusion in electric and gas rates.

PG&E Corporation and the Utility are unable to predict the timing and outcome of this proceeding.

### Application for Post-Emergence Securitization Transaction

On April 30, 2020, the Utility filed an application with the CPUC seeking authorization for a post-emergence transaction to securitize $7.5 billion of 2017 wildfire claims costs that is designed to be rate neutral to customers, with the proceeds used to pay or reimburse the Utility for the payment of wildfire claims costs associated with 2017 Northern California wildfires. As a result of the proposed transaction, the Utility would retire $6.0 billion of Utility debt and accelerate a $700 million payment due to the Fire Victim Trust post-Effective Date. Specifically, the application requests administration of the Stress Test Methodology approved in the CHT OIR and a determination that $7.5 billion in 2017 catastrophic wildfire costs and expenses are Stress Test Costs and eligible for securitization. In this context, a securitization refers to a financing transaction where a special purpose financing vehicle issues new debt that is secured by the proceeds of a new recovery charge to Utility customers. The application also contemplates a customer credit designed to insulate customers from the charge on customer bills associated with the bonds. The Utility proposes to fund the customer credit through a trust that consists of shareholder assets including: (1) an initial contribution of $1.8 billion; (2) up to $7.59 billion of additional contributions funded by certain shareholder tax benefits; and (3) investment returns on the assets in the trust. The Utility anticipates that this will be sufficient to ensure that the customer credits equal the bond charges over the life of the bonds. The Utility also proposes to share with customers 25% of any surplus of shareholder assets in the customer credit trust at the end of the life of the trust.

Protests and response to the application were due June 4, 2020 and the Utility filed a reply on June 12, 2020. A prehearing conference was held on June 18, 2020. The Assigned Commissioner issued the scoping memorandum on July 28, 2020 and directed the Utility to file updated testimony, if any, based on its post-emergence financial status by August 7, 2020. The Utility served its updated testimony on August 7, 2020, in which it discussed , among other things, PG&E Corporation’s and Utility’s exit financings from Chapter 11 and related equity issuances, including to the Fire Victim Trust, in connection with consummating the Plan on July 1, 2020, issuance of revised credit ratings, updated financial forecasts for the Utility and their impacts on the securitization application, including on the Stress Test Costs and the Customer Credit Trust, as well as certain expected tax impacts.

Intervenor testimony was served on October 14, 2020, and the Utility’s rebuttal testimony is due on November 11, 2020. An evidentiary hearing is scheduled to commence on December 7, 2020. Opening briefs are due on January 7, 2021, and reply briefs are due on January 22, 2021.

### 2019 Wildfire Mitigation Plan

As previously disclosed, on October 25, 2018, the CPUC opened an OIR to implement the provisions of SB 901 related to electric utility wildfire mitigation plans. This OIR provided guidance on the form and content of the initial wildfire mitigation plans, provided a venue for review of the initial plans, and developed and refined the content of and process for review and implementation of wildfire mitigation plans to be filed in future years. In this proceeding the CPUC determined, among other things, how to interpret and apply SB 901’s list of required plan elements, as well as what additional elements beyond those required in SB 901 should be included in the wildfire mitigation plans. SB 901 also requires, among other things, that such plans include a description of the preventive strategies and programs to be adopted by an electrical corporation to minimize the risk of its electrical lines and equipment causing catastrophic wildfires, including the consideration of dynamic climate change risks, plans for vegetation management, and plans for inspections of the electrical corporation’s electrical infrastructure. The scope of this proceeding does not include utility recovery of costs related to wildfire mitigation plans, which SB 901 requires to be addressed in separate rate recovery applications.

On February 6, 2019, the Utility filed its wildfire mitigation plan (the “2019 WMP”) with the CPUC, and amended it subsequently on February 12 and February 14. On May 30, 2019, the CPUC approved the 2019 WMP. (The Utility also filed an amendment to the plan on April 25, 2019, but CPUC approval did not extend to that amendment.)

For additional information, see the 2019 Form 10-K.

### 2020-2022 Wildfire Mitigation Plan

As previously disclosed, on February 7, 2020, the Utility publicly posted its 2020 Wildfire Mitigation Plan (the “2020 WMP”) and utility survey. The Utility’s 2020 WMP describes the Utility’s wildfire safety programs, which are focused on three key areas: reducing the potential for fires to be started by electrical equipment, reducing the potential for fires to spread, and minimizing the frequency, scope and duration of Public Safety Power Shut-off events, as well as providing historical data requested by the guidelines.

On March 18, 2020, the CPUC issued a decision in this proceeding, clarifying that the CPUC’s newly created Wildfire Safety Division will review 2020 wildfire mitigation plans, present resolutions for CPUC consideration on the 2020 Plans, and oversee independent evaluation and other compliance activity with regard to both 2019 and 2020 Plans.

On June 11, 2020, the CPUC voted to adopt two resolutions which conditionally approved PG&E’s 2020-2022 WMP. The resolutions indicate that while the Utility’s 2020-2022 WMP met the minimum requirements for its submission, the deficiencies found, classified as Conditions A, B, or C, will require significant oversight to ensure they appropriately prioritize and remedy the deficiencies. The Utility received 41 Conditions in total with the first set classified as Conditions A, which were completed on July 27, 2020. The second set, Conditions B were completed on September 9, 2020 and the third, Conditions C are due as part of the 2021 WMP update in February 2021.

PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows could be materially affected if the Utility is unable to timely recover costs in connection with the 2019 WMP, and the 2020-2022 WMP recorded in the FRMMA and WMPMA, which the Utility expects will be substantial.

For additional information, see the 2019 Form 10-K.

### OIR Regarding Microgrids

As previously disclosed, on September 19, 2019, the CPUC initiated a rulemaking proceeding to examine microgrid implementation issues and resiliency strategies pursuant to SB 1339. In the first track of that proceeding, the CPUC sought to deploy resiliency planning in areas that are prone to outage events and wildfires, with the stated goal of putting some microgrid and other resiliency strategies in place by Spring or Summer 2020, if not sooner. At the CPUC’s direction, the Utility submitted a proposal for immediate implementation of resiliency strategies on January 21, 2020. The Utility’s proposal contained three components for which it is sought scope and cost recovery authorization of up to approximately $379 million in both expense and capital. On April 1, 2020, the Utility filed a motion seeking to supplement its original proposal and to reduce the total cost recovery authorization it was seeking to approximately $257 million. The Utility described in its supplemental testimony that it was focusing in 2020 on the use of temporary, mobile generation solutions to power microgrids in 2020 and that the Utility had suspended its solicitation for permanent generation located at substations with online dates in 2020. On April 13, 2020, the ALJ presiding over the rulemaking issued a ruling denying on procedural grounds the Utility’s motion to supplement its proposal.

The CPUC adopted a decision in the first track of the proceeding on June 11, 2020, which approved with conditions each of the Utility’s three proposed components and requires the Utility to track costs in a new memorandum account. The decision requires the Utility to seek recovery of the recorded costs for the temporary, mobile generation and associated substation facility equipment in a future track of the proceeding. The decision requires the Utility to seek recovery of the costs of the community microgrid enablement program through reasonableness review in a future separate application or a general rate case.

The CPUC initiated the second track of the proceeding on July 3, 2020, which will focus on further implementation of SB 1339, as well as activity to shape the transition from diesel mobile generation to alternative, clean backup power generation. As part of the second track, the CPUC issued a staff proposal on September 4, 2020, describing an interim approach for providing temporary power at substations during the 2021 wildfire season, and a process for completing the transition to clean technologies and fuels in future years. The Utility expects the CPUC to issue a decision on temporary generation policy for the 2021 wildfire season and beyond by the end of 2020.

Failure to obtain a substantial or full recovery of costs could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows.

The Utility has approximately 450 megawatts of temporary generation reserved for use in 2020.

For additional information, see the 2019 Form 10-K.

### OIR Regarding Criteria and Methodology for Wildfire Cost Recovery Pursuant to Senate Bill 901

As previously disclosed, on July 8, 2019, the CPUC issued a decision in the CHT proceeding, which adopts a methodology to determine the CHT based on (1) the maximum additional debt that a utility can take on and maintain a minimum investment grade credit rating; (2) excess cash available to the utility; (3) a potential regulatory adjustment of 20% of the CHT or 5% of the total disallowed wildfire liabilities; and (4) an adjustment to preserve for ratepayers any tax benefits associated with the CHT. The decision also requires a utility to include proposed ratepayer protection measures to mitigate harm to ratepayers as part of an application under Section 451.2(b).

Pursuant to SB 901 and the CPUC’s methodology adopted in the CHT OIR, on April 30, 2020, the Utility filed an application with the CPUC seeking authorization for a post-emergence transaction to securitize $7.5 billion of 2017 wildfire claims costs that is designed to be rate-neutral to customers, with the proceeds used to pay or reimburse the Utility for the payment of wildfire claims costs associated with the 2017 Northern California wildfires. As a result of the proposed transaction, the Utility would retire $6.0 billion of Utility debt and accelerate a $700 million payment due to the Fire Victim Trust post-Effective Date.

For additional information, see “Application for Post-Emergence Securitization Transaction” above and the 2019 Form 10-K.

### OII to Consider PG&E Corporation’s and the Utility’s Plan of Reorganization

As previously disclosed, on October 4, 2019, the CPUC issued an OII to consider the ratemaking and other implications “that will result from the confirmation of a plan of reorganization and other regulatory approvals necessary to resolve” the Chapter 11 Cases (the “Chapter 11 Proceedings OII”).

On May 28, 2020, the CPUC approved a final decision in this proceeding. As previously disclosed, the decision approved PG&E Corporation’s and the Utility’s Plan with certain conditions and modifications related to certain topics, including but not limited to, governance, operational structure, safety performance, executive competition, and financial condition. On September 17, 2020, the CPUC issued a proposed decision that would close the proceeding. On October 22, 2020, the CPUC approved the decision.

#### Regionalization Proposal

On June 30, 2020, the Utility filed its application for approval of its Regionalization Proposal with the CPUC. The Utility’s proposal would divide its service area into five new regions to further improve safety and reliability, core operations, and be more responsive to the needs of its customers. The Utility’s Regionalization Proposal describes the development of these regions, plans to hire new regional leadership, and a new regional organization structure that moves certain work to local regions for both scheduling and execution. The Utility’s application requests the CPUC to approve a memorandum account to record any incremental costs the Utility incurs in connection with the development and implementation of regionalization.

The Utility is unable to predict the timing and outcome of this application.

#### Enhanced Enforcement Process

In the Chapter 11 Proceedings OII final decision, the CPUC adopted an Enhanced Oversight and Enforcement Process (the “Process”) designed to provide a roadmap for how the CPUC will monitor the Utility’s performance on an ongoing basis. The Process contains six steps that are triggered by specific events and includes enhanced reporting requirements and additional monitoring and oversight. The Process also contains provisions for the Utility to cure and permanently exit the Process if it can satisfy specific criteria. If the Utility is placed into the Process, actions taken would occur in coordination with the CPUC’s existing formal and informal reporting requirements and procedures. The Process does not replace or limit the CPUC’s regulatory authority, including the authority to issue Orders to Show Cause and Orders Instituting Investigations and to impose fines and penalties. The Process requires the Utility to report the occurrence of a triggering event to the CPUC’s Executive Director no later than five business day after the date on which any member of senior management of the Utility becomes aware of the occurrence of a triggering event.

For more information about this OII, see PG&E Corporation’s and the Utility’s joint 2019 Form 10-K.

### Wildfire Fund Non-Bypassable Charge

In response to directives in AB 1054, on July 26, 2019, the CPUC opened a new rulemaking to consider the authorization of an NBC to support the Wildfire Fund. On October 24, 2019, the CPUC issued a final decision finding that the imposition of the NBC is just and reasonable. In addition, the decision affirmed that the Utility and its customers will not pay an allocated share of the adopted wildfire charge revenue requirement unless and until the Utility participates in the Wildfire Fund. The decision also continues the same allocation of the wildfire charge revenue requirement among the investor-owned utilities as previously adopted for the Department of Water Resources power and bond charge revenue requirements. The decision proposes revenue requirements for the Utility of $404.6 million, which is based on average annual collections and shall expire at the end of the year 2035.

On November 25, 2019, an individual intervenor filed an application for rehearing of the decision arguing that the decision constitutes a constitutional violation of procedural due process and an unjust and unreasonable rate increase. On March 2, 2020, the CPUC issued a decision denying the application for rehearing.

On July 16, 2020, the CPUC approved the Wildfire Fund NBC servicing orders between the California Department of Water Resources and the Large Electrical Corporations to impose the Wildfire Fund NBC. On September 10, 2020, the CPUC ordered the Utility to cease collection of the DWR Bond Charge related revenue requirement from electric customers in their respective territories. The final month in which a Bond Charge related revenue requirement will be imposed to collect revenue from electric customers of the Utilities will be September 2020.

On September 24, 2020, the CPUC ordered the Utility to collect the Wildfire Fund NBC from eligible customers from October 1, 2020 through December 31, 2020 in the amount of $0.00580 per kilowatt-hour.

On September 29, 2020, the Utility submitted an advice letter to submit tariffs incorporating final rates effective October 1, 2020. In addition to submitting tariff revisions that include final rates as outlined the letter included the tariff revisions needed to cease the imposition of the DWR Bond Charge and implement the Wildfire Fund Charge, submitted on September 25, 2020.

For additional information, see the 2019 Form 10-K.

### Transportation Electrification

SB 350 (the Clean Energy and Pollution Reduction Act), requires the CPUC, in consultation with the CARB and the California Energy Resources Conservation and Development Commission, to direct electrical corporations to file applications for programs and investments to accelerate widespread transportation electrification. In September 2016, the CPUC directed the Utility and the other large IOUs to file transportation electrification applications that include both short-term projects (of up to $20 million in total) and two-to-five year programs with a requested revenue requirement determined by the Utility.

As previously disclosed, on May 31, 2018, the CPUC issued a final decision approving the Utility’s two-to-five year program proposals for actual expenditures up to approximately $269 million (including $198 million of capital expenditures), to support utility-owned make-ready infrastructure supporting public fast charging and medium to heavy-duty fleets.

On December 19, 2018, the CPUC initiated a new Rulemaking for vehicle electrification matters. This new proceeding will include issues related to utility rate designs supporting transportation electrification and hydrogen fueling stations, a framework for IOUs’ transportation electrification investments, and vehicle-grid integration. A prehearing conference for this rulemaking was held on March 1, 2019. On May 2, 2019, the assigned commissioner issued a scoping memo and ruling for the proceeding, which sets forth the category, issues to be addressed, and schedule of the proceeding. On February 3, 2020 the CPUC issued a draft Transportation Electrification Framework for review and comment. The CPUC has held workshops in 2020. Approval of the framework is expected by early 2021.

For additional information, see the 2019 Form 10-K.

### OIR to Establish Policies, Processes, and Rules to Ensure Safe and Reliable Gas Systems in California and Perform Long-Term Gas Planning

On January 16, 2020, the CPUC opened an OIR to address reliability and standards for gas public utilities, the regulatory changes necessary to improve the coordination between gas utilities and gas-fired electric generators, and impacts due to legislative mandates to address the greenhouse gas reduction emissions which will result in the replacement of gas-fuel technologies and forecast reduced demand for natural gas. This proceeding will examine whether recent industry related events will require the CPUC to change the rules, processes and regulations governing gas utilities, including but not limited to, gas reliability standards, long-term contracting, regulatory accounting, reporting and tariff changes for operational flow orders.

The Utility filed opening comments on the preliminary scope on February 26, 2020 and reply comments on March 12, 2020. The assigned ALJ and assigned commissioner held a prehearing conference on March 24, 2020. The Utility filed a post-prehearing conference Statement on April 1, 2020. On April 23, 2020, the assigned commissioner issued a ruling setting the final scope, schedule and categorization for phase 1 (Tracks 1A and 1B). On July 7, the CPUC held a workshop to address natural gas reliability standards (Track 1A) and on July 21, 2020 a second workshop was held to address market structure and regulations (Track 1B). On September 14, 2020, the assigned ALJ issued a Ruling modifying the procedural schedule to allow additional time for CPUC staff to issue a workshop report including recommendations. In accordance with the revised procedural schedule for Phase I, the CPUC staff is expected to issue its Report on October 2, 2020. Parties may then submit opening and reply comments in November 2020 on the Report.

For additional information, see the 2019 Form 10-K.

### OIR to Consider Strategies and Guidance for Climate Change Adaptation

On April 26, 2018, the CPUC opened an OIR to consider strategies for integrating climate change adaptation matters into relevant CPUC proceedings.

On October 24, 2019, the CPUC adopted a final decision on a portion of phase one (Topic 1 and 2), defining climate change adaptation for California’s energy utilities as “adjustment in natural and human systems to a new or changing environment. Adaptation to climate change for energy utilities regulated by the CPUC refers to adjustment in utility systems using strategic and data-driven consideration of actual or expected climatic impacts and stimuli or their effects on utility planning, facilities maintenance and construction, and communications, to maintain safe, reliable, affordable and resilient operations.” In addition, this decision provides guidance on what data should be used by the investor-owned utilities to perform all climate impact, climate risk, and climate vulnerability analyses undertaken with respect to their infrastructure assets, operations, and customer impacts. Finally, this decision requires the energy utilities to adhere to the same climate scenarios and projections used in the most recent California Statewide Climate Change Assessment when analyzing climate impacts, climate risk, and climate vulnerability of utility systems, operations, and customers.

On October 22, 2019, the CPUC issued a staff proposal for a framework for climate-related decision-making and accountability. In the staff proposal, the CPUC instructed each of the large IOUs to research and develop a new form of risk assessment, a CVA. CVAs instruct utilities to “examine the risks posed by climate change to their core lines of business, including generation, transmission, distribution, and storage, irrespective of who owns the assets.” In addition, the staff proposal provides guidance regarding the data sources to be used in the CVA, outreach and coordination with the community, and incorporation of CVA findings into RAMP and GRC filings. The Utility provided opening and reply comments on February 18 and March 3, 2020, respectively.

On August 27, 2020, the CPUC adopted a final decision on Topics 4 and 5, regarding adaptation outreach to disadvantaged communities and detailed requirements for each IOU’s CVA. The CPUC instructed IOUs to establish “climate change teams,” with cross-departmental responsibilities, which will report directly to a designated executive at the SVP level or above. Each IOU must disclose to the CPUC such changes in organizational structure, listing the individual names and department titles of all internal participants. Board members should oversee and prioritize climate adaptation planning, as informed by senior leadership. Each IOU is required to consider climate risks to assets, operations, and services over which IOUs have direct control. Additionally, the decision directs the IOUs seek to obtain and acknowledgement in new contracts with third party providers that the operator has considered long-term climate risk. Each IOUs’ completed CVA will coincide with its RAMP filing during its four-year GRC cycle, and IOUs must detail resulting climate adaptation measures in a new chapter in future GRC applications. Each IOU must file a Community Engagement Plan detailing community outreach on climate adaptation, covering every disadvantaged vulnerable community and leveraging existing IOU community outreach on other matters. The IOUs’ climate adaptation CEP proposals must be filed one year prior to their CVA, with the Utility’s first CEP due in June 2023, as PG&E’s first CVA under this decision will be due in June 2024. A new memorandum account, the Climate Adaptation Vulnerability Assessment Memorandum Account, was authorized, to cover CVA costs and incremental costs of outreach.

### OIR to Examine Electric Utility De-energization of Power Lines in Dangerous Conditions

On December 13, 2018, the CPUC opened an OIR to examine the notification, mitigation, and reporting requirements on electric utilities when de-energizing power lines in case of dangerous conditions that threaten life or property in California.

On May 30, 2019, the CPUC approved a decision for phase one of this proceeding, which adopted de-energization communication and notification guidelines for the electric IOUs along with updates to requirements established in Resolution ESRB-8.

On January 30, 2020, the CPUC proposed new guidelines. Parties submitted opening and reply comments on the guidelines on February 19, 2020 and February 26, 2020, respectively.

As discussed above, on April 13, 2020, a group of local governments and associations filed a Joint Motion for Emergency Order Regarding De-Energization Protocols During the COVID-19 Pandemic, requesting that the CPUC issue an emergency order setting forth de-energization protocols for the Utility and other investor-owned utilities that will remain in place for as long as a State of Emergency or shelter-in-place order remains in effect due to the COVID-19 pandemic. The requested requirements included providing back-up generation to essential services and allowing local governments to veto PSPS events for their areas. The Utility and other entities (including the other IOUs) filed responses on April 20, 2020, requesting that the CPUC deny the motion, and the moving parties and other entities filed responses on April 24, 2020. On August 24, 2020, the ALJ issued a decision holding the April 13, 2020 joint motion in abeyance, finding that the May 28, 2020 decision dealt with many of the issues raised. If the motion were reinstated in the future, a CPUC decision could restrict or impose additional requirements on the Utility in implementing PSPS events.

On May 28, 2020 the CPUC adopted PSPS Phase 2 Guidelines, which requires utilities to restore energy within 24 hours after the end of a PSPS event where possible; to consult with critical facilities on back-up power for PSPS events; and to support access and functional needs populations during PSPS events, including powering medical equipment at customer resource centers. The CPUC’s May 28, 2020 decision did not act on the joint motion.

On June 15, 2020, 14 parties (including telecommunications providers, CCAs, and 10 cities and counties) filed a joint motion requesting that the CPUC perform a reasonableness review of past IOU PSPS events to determine whether each was reasonable. In its August 24, 2020 decision, the CPUC denied the June 15, 2020 motion, finding that the CPUC already performed reasonableness reviews of IOU PSPS events.

For additional information, see the 2019 Form 10-K.

### Order to Show Cause Against the Utility Related to Implementation of the October 2019 PSPS Events

On November 12, 2019, the assigned commissioner and ALJ in the OIR to Examine Electric Utility De-energization of Power Lines in Dangerous Conditions issued an order to show cause directing the Utility to show cause why it should not be sanctioned for violations of law or CPUC decisions related to the PSPS events of October 9-12, 2019, October 23-25, 2019, and October 26-November 1, 2019.

The Utility filed its testimony with the CPUC on February 5, 2020. Parties filed testimony on February 28, 2020; concurrent rebuttal was filed on April 7, 2020. On April 16, 2020, proceedings in the order to show cause phase of this proceeding were suspended indefinitely pending the COVID-19-related restrictions. On July 7, 2020, in response to an email ruling from the ALJ, parties in the order to show cause submitted a joint response that discussed, among other things, the need for evidentiary hearings in the proceeding and a proposed schedule for the remainder of the proceedings. On July 9, 2020 and August 27, 2020, the ALJ held status conferences at which parties discussed those issues. On September 21, 2020, the assigned commissioner and the ALJ issued an order that required the Utility to provide responses to certain factual questions regarding the issues in the proceeding, concluded that with the provision of responsive answers to those questions evidentiary hearings would not be needed in the proceeding, and established a schedule for the remainder of the proceeding. The schedule provides for concurrent opening briefs to be filed on October 30, 2020; concurrent reply briefs on November 17, 2020; a presiding officer decision no later than 60 days following submission; and a final decision no sooner than 30 days after the presiding officer decision if no appeal or request for review is submitted.

The Utility is unable to predict the outcome of this proceeding.

For additional information, see the 2019 Form 10-K.

### OII to Examine the Late 2019 Public Safety Power Shutoff Events

On November 13, 2019, the CPUC issued an OII to determine “whether California’s investor-owned utilities prioritized safety and complied with the CPUC’s regulations and requirements with respect to their Public Safety Power Shutoff (PSPS) events in late 2019.” The first phase of this proceeding will assess for each utility, among other things, (1) the effectiveness of the utility’s procedures to notify the public of the PSPS events, (2) the utility’s communication and coordination with first responders, local jurisdictions and state agencies, and (3) the utility’s management of its resources to ensure public safety. In later phases of this proceeding, the CPUC may consider taking action if it finds violations of statutes or its decisions or general orders have been committed and to enforce compliance, if necessary.

On June 8, 2020, the SED issued a Public Report on the Late 2019 Public Safety Power Shutoff Events. The Report indicated that it described the manner and extent to which each electric investor-owned utility implemented the CPUC’s PSPS Guidelines during their late 2019 PSPS events. The Report stated that it was intended to be advisory in nature, subject to modification, and not intended to serve as an adjudicatory-staff investigatory pre-enforcement report. On June 19, 2020, parties to the OII submitted prehearing statements that provided, among other things, views on the appropriate next steps in the proceeding. On June 22, 2020, the ALJ held a prehearing conference that discussed appropriate next steps in the proceeding. On August 3, 2020, the ALJ issued a ruling finding that a hearing was not necessary and setting the schedule for the proceeding, and on September 18, 2020, the ALJ granted a motion to extend time for intervenor and reply comments. IOU comments were submitted September 2, 2020, intervenor comments were submitted October 16, 2020, and reply comments are due November 16, 2020. The proposed decision is anticipated 90 days after submission of reply briefs, and the CPUC decision is anticipated no sooner than 30 days after issuance of the proposed decision.

Also on August 3, 2020, the assigned commissioner issued a ruling and scoping memo directing parties to file comments on SED’s report and the following two issues: (1) whether the Utility and other IOUs in October and November 2019 complied with the criteria set forth in applicable laws and regulations when pro-actively deenergizing and re-energizing their power lines, and (2) what corrective actions should the CPUC should require of the Utility and other IOUs for any failure in late 2019 to comply with the then-existing PSPS guidelines

For additional information, see the 2019 Form 10-K.

### Power Charge Indifference Adjustment OIR

In 2017, the CPUC initiated the PCIA Rulemaking to make refinements to the PCIA, a cost recovery mechanism to ensure that customers that leave the Utility’s bundled service for a non-Utility provider, such as a DA or CCA provider, pay their fair share of the above market costs associated with long-term power purchase commitments and Utility-owned generation made on their behalf. The above market costs of the Utility’s generation portfolio are calculated using benchmarks for energy, resource adequacy (RA) and RPS attributes.

As previously disclosed, on October 11, 2018, the CPUC approved a phase one decision to modify the PCIA methodology. The Utility implemented a revised PCIA reflecting this decision in rates as of July 1, 2019.

Also, as previously disclosed, on October 10, 2019, the CPUC approved a final decision that finalized the true-up for the new PCIA methodology.

On March 26, 2020, the CPUC approved a final decision on departing load forecasting and PCIA bill presentation issues, establishing that the IOUs shall show a PCIA line item in their tariffs and bill summary tables on all customer bills, which shall be implemented by the last business day of 2021.

On June 30, 2020, the CPUC issued a PD that would provide a non-Utility provider an option to prepay their entire PCIA obligation. On August 6, 2020 the CPUC issued a final decision adopting a framework for prepayment agreements for PCIA obligations.

The proceeding is now examining structures and rules governing how the Utility addresses excess resources in its portfolio due to load loss to CCA and DA, including standards for active management of the Utility’s portfolios. A PD is expected in the fourth quarter of 2020.

For additional information, see the 2019 Form 10-K.

### Central Procurement of the Resource Adequacy Program

On June 17, 2020, the CPUC issued a decision on the Central Procurement of the RA Program. The decision adopted implementation details for the central procurement of multi-year local RA procurement, ordered the Utility and another IOU to serve as the central procurement entities for their respective distribution service areas, and adopted a hybrid central procurement framework for the multi-year local RA program beginning for the 2023 RA compliance year.

The decision requires the Utility, as the central procurement entity for its distribution service area, to conduct a competitive, all-source solicitation for local RA procurement, with any existing local resource that does not have a contract, any new local resource that can be brought online in time to meet solicitation requirements, or any load serving entity or third-party with an existing local RA contract eligible to bid into the solicitation.

The Cost Allocation Mechanism methodology is adopted as the cost recovery mechanism to cover procurement costs incurred in serving the central procurement function. The administrative costs incurred in serving the central procurement entity function shall also be recoverable under the Cost Allocation Mechanism.

### LEGISLATIVE AND REGULATORY INITIATIVES

### Senate Bill 350

On June 30, 2020, the California governor signed into law SB 350 (the Golden State Energy Act), a bill which authorizes the creation by the governor of a new entity “Golden State Energy,” a nonprofit public benefit corporation, for the purpose of acquiring the Utility’s assets and serving electric and gas in the Utility’s service territory only in the event that the CPUC determines that the Utility’s Certificate of Public Convenience and Necessity should be revoked pursuant to any process or procedures adopted by the CPUC in its decision approving PG&E Corporation’s and the Utility’s Plan of Reorganization.

### Senate Bill 901

SB 901, signed into law on September 21, 2018, requires the CPUC to establish a CHT, directing the CPUC to limit certain disallowances in the aggregate, so that they do not exceed the CHT. SB 901 also authorizes the CPUC to issue a financing order that permits recovery, through the issuance of recovery bonds (also referred to as “securitization”), of wildfire-related costs found to be just and reasonable by the CPUC and, only for the 2017 Northern California wildfires, any amounts in excess of the CHT.

For additional information, see the 2019 Form 10-K.

### Assembly Bill 1054

On July 12, 2019, the California governor signed into law AB 1054, a bill which provides for the establishment of a statewide fund that will be available for eligible electric utility companies to pay eligible claims for liabilities arising from wildfires occurring after July 12, 2019 that are caused by the applicable electric utility company’s equipment, subject to the terms and conditions of AB 1054. Eligible claims are claims for third party damages resulting from any such wildfires, limited to the portion of such claims that exceeds the greater of (i) $1.0 billion in the aggregate in any calendar year and (ii) the amount of insurance coverage required to be in place for the electric utility company pursuant to section 3293 of the Public Utilities Code, added by AB 1054.

AB 1054 also provides that the first $5.0 billion expended in the aggregate by California’s three investor-owned electric utility companies on fire risk mitigation capital expenditures included in their respective approved wildfire mitigation plans will be excluded from their respective equity rate bases. The $5.0 billion of capital expenditures will be allocated among the investor-owned electric utility companies in accordance with their Wildfire Fund allocation metrics (described above). AB 1054 contemplates that such capital expenditures may be securitized through a customer charge.

Each of California’s large investor owned utilities have elected to participate in the Wildfire Fund. On July 1, 2020, having satisfied the conditions for the Utility’s participation in the Wildfire Fund, the Utility deposited approximately $5 billion in the Wildfire Fund, which represents PG&E’s initial and first annual contributions.

For additional information, see the 2019 Form 10-K.

### Senate Bill 378

In addition to other requirements, SB 378 would impose on an electric utility company a civil penalty of at least $250,000 per 50,000 affected customers for every hour that a PSPS event is in place, would require the CPUC to establish a procedure for customers, local governments and others to recover costs accrued during a PSPS event from the electric utility company, which cost recovery would be borne by shareholders, and would prohibit an electric utility company from billing customers for any nonfixed costs during a PSPS event.

### Assembly Bill 1941

AB 1941 proposes to suspend RPS requirements, determine the savings to electric utility companies from the suspension and direct those savings towards system hardening to mitigate wildfire risks and PSPS impacts, and would prohibit salary increases or bonuses to executive officers during the suspension of RPS requirements.

### ENVIRONMENTAL MATTERS

The Utility’s operations are subject to extensive federal, state, and local laws and permits relating to the protection of the environment and the safety and health of the Utility’s personnel and the public. These laws and requirements relate to a broad range of the Utility’s activities, including the remediation of hazardous wastes; the reporting and reduction of carbon dioxide and other greenhouse gas emissions; the discharge of pollutants into the air, water, and soil; the reporting of safety and reliability measures for natural gas storage facilities; and the transportation, handling, storage, and disposal of spent nuclear fuel. (See Note 11 of the Notes to the Condensed Consolidated Financial Statements in Item 1 of this Form 10-Q, as well as “Item 1A. Risk Factors” and Note 15 of the Notes to the Consolidated Financial Statements in Item 8 of the 2019 Form 10-K.)

### CONTRACTUAL COMMITMENTS

PG&E Corporation and the Utility enter into contractual commitments in connection with future obligations that relate to purchases of electricity and natural gas for customers, purchases of transportation capacity, purchases of renewable energy, and purchases of fuel and transportation to support the Utility’s generation activities. (See “Purchase Commitments” in Note 11 of the Notes to the Condensed Consolidated Financial Statements in Item 1). Contractual commitments that relate to financing arrangements include long-term debt, preferred stock, and certain forms of regulatory financing. For more in-depth discussion about PG&E Corporation’s and the Utility’s contractual commitments, see “Liquidity and Financial Resources” above and MD&A “Contractual Commitments” in Item 7 of the 2019 Form 10-K.

### Off-Balance Sheet Arrangements

PG&E Corporation and the Utility do not have any off-balance sheet arrangements that have had, or are reasonably likely to have, a current or future material effect on their financial condition, changes in financial condition, revenues or expenses, results of operations, liquidity, capital expenditures, or capital resources, other than those discussed in Note 15 of the Notes to the Consolidated Financial Statements in Item 8 of the 2019 Form 10-K (the Utility’s commodity purchase agreements).

### RISK MANAGEMENT ACTIVITIES

PG&E Corporation, mainly through its ownership of the Utility, and the Utility are exposed to risks associated with adverse changes in commodity prices, interest rates, and counterparty credit.

The Utility actively manages market risk through risk management programs designed to support business objectives, discourage unauthorized risk-taking, reduce commodity cost volatility, and manage cash flows. The Utility uses derivative instruments only for risk mitigation purposes and not for speculative purposes. The Utility’s risk management activities include the use of physical and financial instruments such as forward contracts, futures, swaps, options, and other instruments and agreements, most of which are accounted for as derivative instruments. Some contracts are accounted for as leases. The Utility manages credit risk associated with its counterparties by assigning credit limits based on evaluations of their financial conditions, net worth, credit ratings, and other credit criteria as deemed appropriate. Credit limits and credit quality are monitored periodically. These activities are discussed in detail in the 2019 Form 10-K. There were no significant developments to the Utility’s and PG&E Corporation’s risk management activities during the nine months ended September 30, 2020.

### CRITICAL ACCOUNTING POLICIES

The preparation of the Condensed Consolidated Financial Statements in accordance with GAAP involves the use of estimates and assumptions that affect the recorded amounts of assets and liabilities as of the date of the Condensed Consolidated Financial Statements and the reported amounts of revenues and expenses during the reporting period. PG&E Corporation and the Utility consider their accounting policies for regulatory assets and liabilities, loss contingencies associated with environmental remediation liabilities and legal and regulatory matters, AROs, and pension and other post-retirement benefit plans to be critical accounting policies. These policies are considered critical accounting policies due, in part, to their complexity and because their application is relevant and material to the financial position and results of operations of PG&E Corporation and the Utility, and because these policies require the use of material judgments and estimates. Actual results may differ materially from these estimates and assumptions. These accounting policies and their key characteristics are discussed in detail in the 2019 Form 10-K.

### Contributions to the Wildfire Fund

On the Effective Date, PG&E Corporation and the Utility contributed, in accordance with AB 1054, an initial contribution of approximately $4.8 billion and first annual contribution of approximately $193 million to the Wildfire Fund to secure participation of the Utility therein. As of September 30, 2020, PG&E Corporation and the Utility have nine remaining annual contributions of $193 million. PG&E Corporation and the Utility account for the contributions to the Wildfire Fund similarly to prepaid insurance with expense being allocated to periods ratably based on an estimated period of coverage. The Wildfire Fund is available to pay for eligible claims arising as of July 12, 2019, the effective date of AB 1054, subject to a limit of 40% of the amount of such claims arising between the effective date of AB 1054 and the Utility’s emergence from Chapter 11. The 40% limit does not apply to eligible claims that arise after the Utility’s emergence from Chapter 11. The Wildfire Fund is additionally limited to the portion of such claims that exceeds the greater of (i) $1.0 billion in the aggregate in any calendar year and (ii) the amount of insurance coverage required to be in place for the electric utility company pursuant to Section 3293 of the Public Utilities Code, added by AB 1054.

In the second quarter of 2020, PG&E Corporation and the Utility recorded a current liability of $5.2 billion in “Wildfire fund liability” and $1.5 billion in Other noncurrent liabilities for the present value of unpaid contribution amounts, as well as $6.5 billion in assets for its commitment to make contributions, reduced by amortization, of which $6.0 billion were non-current, called “Wildfire fund asset” in the Condensed Consolidated Balance Sheets. The initial contribution and first annual contribution were paid in the third quarter of 2020. During the three and nine months ended September 30, 2020, the Utility recorded amortization and accretion expense of $120 million and $293 million, respectively. The amortization of the asset, accretion of the liability, and if applicable, impairment of the asset is reflected in “Wildfire fund expense” in the Condensed Consolidated Statements of Income. Expected contributions are discounted to the present value using the 10-year US treasury rate at the date PG&E Corporation and the Utility satisfied all the eligibility requirements to participate in the Wildfire Fund. A useful life of 15 years is being used to amortize the Wildfire Fund asset.

AB 1054 did not specify a period of coverage; therefore, this accounting treatment is subject to significant accounting judgments and estimates. In estimating the period of coverage, PG&E Corporation and the Utility use a Monte Carlo simulation starting with 12 years of historical, publicly available fire-loss data from wildfires caused by electrical equipment. The period of historic fire-loss data and the effectiveness of mitigation efforts by the California electric utility companies are significant assumptions used to estimate the useful life. These assumptions along with the other assumptions below create a high degree of uncertainty related to the estimated useful life of the Wildfire Fund. The simulation results in the estimated number and severity of catastrophic fires that could occur in California within the participating electric utilities’ service territories during the term of the Wildfire Fund. Using a 5 year period of historical data, with average annual statewide claims or settlements of approximately $6.5 billion, compared to approximately $2.9 billion for the 12-year historical data, would decrease the amortization period to 6 years. Similarly, a ten percent change to the assumption around current and future mitigation effort effectiveness would increase the amortization period to 17 years assuming greater effectiveness and would decrease the amortization period to 12 years assuming less effectiveness.

Other assumptions used to estimate the useful life include the estimated cost of wildfires caused by other electric utilities, the amount at which wildfire claims would be settled, the likely adjudication of the CPUC in cases of electric utility-caused wildfires, the impacts of climate change, the level of future insurance coverage held by the electric utilities, the FERC-allocable portion of loss recovery, and the future transmission and distribution equity rate base growth of other electric utilities. Significant changes in any of these estimates could materially impact the amortization period.

PG&E Corporation and the Utility evaluate all assumptions quarterly, or upon claims being made from the Wildfire Fund for catastrophic wildfires, and the expected life of the Wildfire Fund will be adjusted as required. The Wildfire Fund is available to other participating utilities in California and the amount of claims that a participating utility incurs is not limited to their individual contribution amounts. PG&E Corporation and the Utility will assess the Wildfire Fund asset for impairment in the event that a participating utility's electrical equipment is found to be the substantial cause of a catastrophic wildfire. Timing of any such impairment could lag as the emergence of sufficient cause and claims information can take many quarters and could be limited to public disclosure of the participating electric utility, if ignition were to occur outside the Utility’s service territory. At September 30, 2020, there were no such known events requiring a reduction of the Wildfire Fund asset nor have there been any claims or withdrawals by the participating utilities against the Wildfire Fund.

### ACCOUNTING STANDARDS ISSUED BUT NOT YET ADOPTED

See the discussion above in Note 3 of the Notes to the Condensed Consolidated Financial Statements in Item 1.

## Market risk

As filed, 616 characters.

PG&E Corporation’s and the Utility’s primary market risk results from changes in energy commodity prices. PG&E Corporation and the Utility engage in price risk management activities for non-trading purposes only. Both PG&E Corporation and the Utility may engage in these price risk management activities using forward contracts, futures, options, and swaps to hedge the impact of market fluctuations on energy commodity prices and interest rates. (See the section above entitled “Risk Management Activities” in MD&A and in Note 8 and Note 9 of the Notes to the Condensed Consolidated Financial Statements in Item 1.)

## Controls and procedures

As filed, 1,207 characters.

Based on an evaluation of PG&E Corporation’s and the Utility’s disclosure controls and procedures as of September 30, 2020, PG&E Corporation’s and the Utility’s respective principal executive officers and principal financial officers have concluded that such controls and procedures are effective to ensure that information required to be disclosed by PG&E Corporation and the Utility in reports that the companies file or submit under the Securities Exchange Act of 1934, as amended, is (i) recorded, processed, summarized, and reported within the time periods specified in the SEC rules and forms, and (ii) accumulated and communicated to PG&E Corporation’s and the Utility’s management, including PG&E Corporation’s and the Utility’s respective principal executive officers and principal financial officers, or persons performing similar functions, as appropriate to allow timely decisions regarding required disclosure.

There were no changes in internal control over financial reporting that occurred during the quarter ended September 30, 2020, that have materially affected, or are reasonably likely to materially affect, PG&E Corporation’s or the Utility’s internal control over financial reporting.

## Risk factors

As filed, 23,239 characters.

For information about the significant risks that could affect PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows, see the section of the 2019 Form 10-K and in PG&E Corporation’s and the Utility’s joint quarterly reports for the periods ended March 31, 2020 and June 30, 2020 entitled “Risk Factors,” as supplemented below, and the section of this quarterly report entitled “Forward-Looking Statements.”

***PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected as a result of the 2019 Kincade fire, the 2020 Zogg fire or future wildfires.***

PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected as a result of the 2019 Kincade fire, the 2020 Zogg fire or future wildfires.

On July 16, 2020, Cal Fire issued a press release addressing the cause of the 2019 Kincade fire. Cal Fire stated that it had “determined that the Kincade Fire was caused by electrical transmission lines owned and operated by Pacific Gas and Electric (PG&E) located northeast of Geyserville. Tinder dry vegetation and strong winds combined with low humidity and warm temperatures contributed to extreme rates of fire spread.” Cal Fire also indicated that its investigative report has been forwarded to the Sonoma County District Attorney’s Office, which is investigating the matter.

On October 9, 2020, Cal Fire informed the Utility that it had taken possession of the Utility’s equipment as part of its ongoing investigation into the cause of the 2020 Zogg fire. Cal Fire has not issued a determination of cause. The Shasta County District Attorney’s Office is also investigating the fire.

Although there are a number of unknown facts surrounding Cal Fire’s causation determination of the 2019 Kincade fire and their investigation of the 2020 Zogg fire, the Utility could be subject to significant liability in excess of insurance coverage that would be expected to have a material impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. PG&E Corporation and the Utility have also received and are responding to data requests from the CPUC’s SED relating to the 2019 Kincade fire and the 2020 Zogg fire. PG&E Corporation and the Utility could be the subject of additional investigations, lawsuits, or enforcement actions in connection with the 2019 Kincade fire, the 2020 Zogg fire or future wildfires.

In addition, the 2019 Kincade fire, the 2020 Zogg fire or future wildfires could have adverse consequences on the Utility’s probation proceeding, the Utility’s proceedings with the CPUC and FERC (including the Safety Culture OII), and future regulatory proceedings, including future applications for the safety certification required by AB 1054. PG&E Corporation and the Utility may also suffer additional reputational harm and face an even more challenging operating, political, and regulatory environment. For more information about the 2019 Kincade fire and the 2020 Zogg fire, see Note 10 “Wildfire-Related Contingencies” in Part I, Item 1.

***PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows could be significantly affected by the outbreak of the COVID-19 pandemic.***

PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows have been (beginning in March 2020) and could continue to be significantly affected by the outbreak of COVID-19, but the extent of such impact is uncertain. In December 2019, a novel strain of coronavirus (COVID-19) was reported to have surfaced in Wuhan, China, resulting in significant disruptions to manufacturing, supply chain, markets, and travel world-wide. On January 30, 2020, the International Health Regulations Emergency Committee of the World Health Organization declared the COVID-19 outbreak a public health emergency of international concern and on March 12, 2020, announced the outbreak was a pandemic. On March 16, 2020, the California governor issued an Executive Order requiring the CPUC to direct electric utility companies to follow customer protection measures including a moratorium on service disconnections for residential and small business customers, retroactive to March 4, 2020. After a statewide shelter in place order instituted on March 19, 2020, on April 28, 2020, the California governor announced four different stages for easing the California shelter-in-place measures. California currently has a blueprint for reducing COVID-19 in the state with revised criteria for loosening and tightening restrictions on activities. It is uncertain when further modifications and restrictions will be implemented.

While the extent of the impact of the current COVID-19 outbreak on PG&E Corporation’s and the Utility’s business and financial results is uncertain, the consequences of a continued and prolonged outbreak and resulting government and regulatory orders could have a further negative impact on the Utility’s financial condition, results of operations, liquidity and cash flows.

The outbreak of COVID-19 and the resulting economic conditions, including but not limited to the shelter-in-place order and resulting decrease in economic and industrial activity in the Utility’s service territory have and will continue to have a significant adverse impact on the Utility’s customers; these circumstances have impacted and will continue to impact the Utility for a period of time that PG&E Corporation and the Utility are unable to predict. For example, the economic downturn has already resulted in a reduction in customer receipts and collection delays in the second and third quarters of 2020.

The Utility’s customer energy accounts receivable balances over 30 days outstanding as of September 30, 2020 were approximately $696 million, or $310 million higher as compared to the corresponding month in 2019. The Utility is unable to estimate the portion of the increase directly attributable to the COVID-19 pandemic. The Utility expects to continue experiencing an impact on monthly cash collections in 2020 and for as long as current COVID-19 circumstances persist.

On April 16, 2020, the CPUC passed a resolution requiring COVID-19 related emergency customer protection measures starting from the March 4, 2020 Emergency Proclamation and consistent with the March 16, 2020 Executive Order. The Resolution allows associated costs to be tracked in a memorandum account, the COVID-19 Pandemic Protections Memorandum Account (CPPMA). The CPPMA allows tracking of residential and small business customers’ incremental uncollectible costs. In addition, the Utility’s proposed 2020 GRC settlement would continue the Utility’s existing mechanism to address uncollectibles, which allows the Utility to readjust its uncollectibles rate on an annual basis based on the most recent 10-year average of uncollectibles. In addition, the June 11, 2020 decision in the *OIR to Consider New Approaches to Disconnections and Reconnections to Improve Energy Access and Contain Costs* (Disconnections OIR) provides for a two-way balancing account for residential uncollectibles and memorandum account for OIR implementation costs. The Utility is unable to predict whether these measures will allow for future recovery of these amounts.

In addition, the Utility has experienced average reductions of approximately 3% in electric load and approximately 3% in core gas load on a weather-adjusted basis from mid-March to early October, resulting in an estimated $350 million reduction in billed revenues for the mid-March to early October period. PG&E Corporation and the Utility are currently unable to quantify the long-term potential impact of the changes in customer collections or changes in energy demand on earnings and cash flows due, in part, to uncertainties regarding the timing, duration and intensity of the COVID-19 outbreak and the resulting economic downturn. Although the CPUC authorized the establishment of memorandum and balancing accounts to track costs associated with customer protection measures, the timing of regulatory relief, if any, and ultimately cost recovery from such accounts or otherwise, are uncertain.

The COVID-19 pandemic and resulting economic downturn have resulted and will continue to result in workforce disruptions, both in personnel availability (including a reduction in contract labor resources) and deployment. In preparation for the return of a few teams to their offices, the Utility has issued a “Return to PG&E Playbook” that explains the safety-related steps the company is taking, as well as the steps that PG&E Corporation’s and the Utility’s employees should take. The guidance includes important reminders of policies on personal hygiene, travel, reporting exposure or illness, and other topics.

Although the Utility continues to prioritize customer and community safety, these disruptions necessitate changes to the Utility’s operating and capital expenditure plans, which could lead to project delays or service disruptions in certain programs. Delays in production and shipping of materials used in the Utility’s operations may also impact operations.

In addition, COVID-19 has the potential to cause delays and disruptions in various regulatory proceedings in which the Utility is involved. Following Department of Health guidance concerning restrictions on public gatherings, the CPUC has cancelled all public forums and has been conducting remote meetings for events it deems essential. A disruption in CPUC operations could impact the timing of PG&E Corporation’s and the Utility’s rate cases and other regulatory proceedings.

In addition, as discussed above, a group of local government entities and organizations filed a Joint Motion asking the CPUC to require utilities to comply with additional requirements when implementing PSPS events while local areas are sheltering-in-place due to COVID-19. The requested requirements included providing back-up generation to essential services and allowing local governments to veto PSPS events for their areas. The Utility and other entities (including the other IOUs) filed responses on April 20, 2020, requesting that the CPUC deny the motion, and the moving parties and other entities filed responses on April 24, 2020. On August 24, 2020, the ALJ issued a decision holding the April 13, 2020 joint motion in abeyance, finding that the May 28, 2020 decision dealt with many of the issues raised. If the motion were reinstated in the future, a CPUC decision could restrict or impose additional requirements on the Utility in implementing PSPS events.

PG&E Corporation and the Utility expect additional financial impacts in the future as a result of COVID-19. Potential longer-term impacts of COVID-19 on PG&E Corporation or the Utility include the potential for higher credit spreads and borrowing costs and incremental financing needs. PG&E Corporation’s and the Utility’s analysis of the potential impact of COVID-19 is preliminary and subject to change. PG&E Corporation and the Utility are unable to predict the timing, duration or intensity of the COVID-19 situation and its effects on the business and general economic conditions in the State of California and the United States of America.

***PG&E Corporation’s and the Utility’s substantial indebtedness following the Reorganization may adversely affect their financial health and operating flexibility.***

PG&E Corporation and the Utility have a substantial amount of indebtedness as a result of the reorganization transactions in connection with implementation of the Plan, most of which is secured by liens on the assets of PG&E Corporation and the Utility. As of September 30, 2020, PG&E Corporation had approximately $4.75 billion of outstanding indebtedness (such indebtedness consisting of the 2028 Notes, the 2030 Notes and borrowings under the Term Loan), and the Utility had approximately $31.8 billion of outstanding indebtedness (such indebtedness including the Utility Reinstated Senior Notes, the Mortgage Bonds and the Utility Term Loan Credit Agreement). In addition, PG&E Corporation and the Utility had $500 million of additional borrowing capacity under the Corporation Revolving Credit Agreement, and the Utility had $1.71 billion of additional borrowing capacity under the Utility Revolving Credit Agreement. In addition, the Utility had outstanding preferred stock with an aggregate liquidation preference of $252 million.

Since PG&E Corporation and the Utility have a historically high level of debt, a substantial portion of cash flow from operations will be used to make payments on this debt. Furthermore, since a significant percentage of the Utility’s assets are used to secure its debt, this reduces the amount of collateral available for future secured debt or credit support and reduces its flexibility in operating these secured assets. This relatively high level of debt and related security could have other important consequences for PG&E Corporation and the Utility, including:

- limiting their ability or increasing the costs to refinance their indebtedness;
- limiting their ability to borrow additional amounts for working capital, capital expenditures, debt service requirements, execution of their business strategy or other purposes;
- limiting their ability to use operating cash flow in other areas of their business because they must dedicate a substantial portion of these funds to service debt;
- increasing their vulnerability to general adverse economic and industry conditions, including increases in interest rates, particularly given their substantial indebtedness that bears interest at variable rates, as well as to catastrophic events; and
- limiting their ability to capitalize on business opportunities.

Under the terms of the agreements and indentures governing their respective indebtedness, PG&E Corporation and the Utility are permitted to incur additional indebtedness, some of which could be secured (subject to compliance with certain tests) and which could further accentuate these risks. As a result of the high level of indebtedness, PG&E Corporation and the Utility may be unable to generate sufficient cash through operations to service such debt, and may need to refinance such indebtedness at or prior to maturity and be unable to obtain financing on suitable terms or at all, any of which could have a material adverse effect on PG&E Corporation’s and the Utility’s business, financial condition and results of operations.

### Parties have appealed the Confirmation Order.

Following entry of the Confirmation Order confirming the Plan, certain parties filed notices of appeal with respect to the Confirmation Order. There can be no assurance that any such appeal will not be successful and, if successful, that any such appeal would not have a material adverse effect on PG&E Corporation and the Utility.

***PG&E Corporation may be required to issue shares with respect to HoldCo Rescission or Damage Claims, which would result in dilution to holders of PG&E Corporation common stock.***

On the Effective Date, PG&E Corporation issued to the Fire Victim Trust a number of shares of common stock equal to 22.19% of the outstanding common stock on such date. As further described in “Satisfaction of HoldCo Rescission or Damage Claims and Subordinated Debt Claims” in Note 10 of the Notes to the Condensed Consolidated Financial Statements in Item 1, PG&E Corporation may be required to issue shares of its common stock in respect of allowed HoldCo Rescission or Damage Claims. If such issuance is required, it may be determined that, under the Plan, the Fire Victim Trust should receive additional shares of PG&E Corporation common stock such that it would have owned 22.19% of the outstanding common stock of reorganized PG&E Corporation on the Effective Date, assuming that such issuance of shares in respect of the HoldCo Rescission or Damage Claims had occurred on the Effective Date. Any such issuances will result in dilution to anyone who holds shares of PG&E Corporation common stock prior to such issuance and may cause the trading price of PG&E Corporation shares to decline.

***Any substantial sale of stock by existing stockholders could depress the market value of PG&E Corporation’s common stock, thereby devaluing the market price and causing investors to risk losing all or part of their investment.***

Certain existing stockholders, including the Fire Victim Trust, the investors party to the Investment Agreement and the Backstop Parties, hold a large number of the outstanding shares of PG&E Corporation. PG&E Corporation can make no prediction as to the effect, if any, that sales of shares, or the availability of shares for future sale, will have on the prevailing market price of shares of PG&E Corporation common stock. Sales of substantial amounts of shares common stock in the public market, or the perception that such sales could occur, could depress prevailing market prices for such shares. Such sales may also make it more difficult for PG&E Corporation to sell equity securities or equity-linked securities in the future at a time and price which it deems appropriate.

***The ability of PG&E Corporation to use some or all of its net operating loss carryforwards and other tax attributes to offset future income may be limited.***

As of December 31, 2019, PG&E Corporation had net operating loss carryforwards for PG&E Corporation’s consolidated group for U.S. federal and California income tax purposes of approximately $5.9 billion and $1.9 billion, respectively, and PG&E Corporation incurred and will incur in connection with the Plan significant net operating loss carryforwards and other tax attributes. The ability of PG&E Corporation to use some or all of these net operating loss carryforwards and certain other tax attributes may be subject to certain limitations. Under Section 382 of the Internal Revenue Code (which also applies for California state income tax purposes), if a corporation (or a consolidated group) undergoes an “ownership change,” such net operating loss carryforwards and other tax attributes may be subject to certain limitations. In general, an ownership change occurs if the aggregate stock ownership of certain shareholders (generally 5% shareholders, applying certain look-through and aggregation rules) increases by more than 50% over such shareholders’ lowest percentage ownership during the testing period (generally three years). Losses incurred in the same taxable year as an ownership change generally can be pro-rated between the pre- and post-change portions of the taxable year, even if a disproportionate amount of such losses were actually incurred on or prior to the date of the ownership change. Only the portion of such losses allocated to the pre-change portion of the year would be subject to the annual limitation.

As of the date of this report, PG&E Corporation does not believe that it has undergone an ownership change and its net operating loss carryforwards and other tax attributes are not limited by Section 382 of the Internal Revenue Code. However, whether PG&E Corporation underwent or will undergo an ownership change as a result of the transactions in PG&E Corporation’s equity that occurred pursuant to the Plan depends on several factors outside PG&E Corporation’s control and the application of certain laws that are uncertain in several respects. Accordingly, there can be no assurance that the IRS would not successfully assert that PG&E Corporation has undergone or will undergo an ownership change pursuant to the Plan. In addition, even if these transactions did not cause an ownership change, they may increase the likelihood that PG&E Corporation may undergo an ownership change in the future. If the IRS successfully asserts that PG&E Corporation did undergo, or PG&E Corporation otherwise does undergo, an ownership change, the limitation on its net operating loss carryforwards and other tax attributes under Section 382 of the Internal Revenue Code could be material to its operations.

In particular, limitations imposed on PG&E Corporation’s ability to utilize net operating loss carryforwards or other tax attributes could cause U.S. federal and California income taxes to be paid earlier than would be paid if such limitations were not in effect and could cause such net operating loss carryforwards or other tax attributes to expire unused, in each case reducing or eliminating the benefit of such net operating loss carryforwards and other tax attributes. Specifically, PG&E Corporation’s ability to utilize its net operating loss carryforwards is critical to a successful rate-neutral securitization transaction after the Effective Date, the proceeds of which are expected to be used to satisfy PG&E Corporation’s and the Utility’s obligations to the Fire Victim Trust, and to PG&E Corporation’s and the Utility’s commitment to make certain operating and capital expenditures. Failure to consummate a securitization transaction or obtain alternative sources of capital could have a material adverse effect on PG&E Corporation and the Utility and the value of PG&E Corporation common stock.

***The ability of PG&E Corporation to pay dividends on shares of PG&E Corporation common stock is subject to restrictions.***

In response to concerns raised by California governor Gavin Newsom, PG&E Corporation and the Utility filed the Case Resolution Contingency Process Motion with the Bankruptcy Court setting forth certain commitments in connection with the confirmation process and implementation of the Plan, including, among other things, limitations on the ability of PG&E Corporation to pay dividends on shares of its common stock (the “Dividend Restriction”). The Dividend Restriction provides that PG&E Corporation may not pay dividends on shares of its common stock until it recognizes $6.2 billion in Non-GAAP Core Earnings following the Effective Date. “Non-GAAP Core Earnings” means GAAP earnings adjusted for certain non-core items. Additionally, the ruling of the court overseeing the Utility’s probation dated April 3, 2019 places further restrictions on the ability of PG&E Corporation and the Utility to issue dividends. Under the ruling, no dividends may be issued until the Utility is fully in compliance with all applicable laws concerning vegetation management and clearance requirements, as well as the vegetation management and enhanced vegetation management targets and metrics in the Utility’s wildfire mitigation plan.

Subject to the foregoing restrictions, any decision to declare and pay dividends in the future will be made at the discretion of the Board of Directors and will depend on, among other things, PG&E Corporation’s results of operations, financial condition, cash requirements, contractual restrictions and other factors that the Board of Directors may deem relevant. Certain of the Utility’s debt instruments contain covenants that restrict the ability of the Utility to pay dividends to PG&E Corporation.

Filed Oct 29, 2020.