## Figures reported in this filing

Standardized XBRL line items for the period ended 2021-03-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2021-01-01 to 2021-03-31 | $4.72bn | us-gaap:RevenueFromContractWithCustomerExcludingAssessedTax |
| Operating income | 3 months, 2021-01-01 to 2021-03-31 | $304.0m | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2021-01-01 to 2021-03-31 | $408.0m | us-gaap:InterestExpense |
| Income tax | 3 months, 2021-01-01 to 2021-03-31 | −$98.0m | us-gaap:IncomeTaxExpenseBenefit |
| Diluted EPS | 3 months, 2021-01-01 to 2021-03-31 | $0.06 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2021-01-01 to 2021-03-31 | $0.06 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2021-01-01 to 2021-03-31 | 2,131,000,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months, 2021-01-01 to 2021-03-31 | $1.20bn | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 3 months, 2021-01-01 to 2021-03-31 | $1.78bn | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Cash and equivalents | at 2021-03-31 | $229.0m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2021-03-31 | $9.07bn | us-gaap:AssetsCurrent |
| Total assets | at 2021-03-31 | $98.56bn | us-gaap:Assets |
| Current liabilities | at 2021-03-31 | $12.22bn | us-gaap:LiabilitiesCurrent |
| Long-term debt | at 2021-03-31 | $37.80bn | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2021-03-31 | $1.52bn | us-gaap:LongTermDebtCurrent |
| Short-term borrowings | at 2021-03-31 | $1.45bn | us-gaap:ShortTermBorrowings |
| Shareholders' equity | at 2021-03-31 | $21.13bn | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 138,645 characters.

### OVERVIEW

PG&E Corporation is a holding company whose primary operating subsidiary is Pacific Gas and Electric Company, a public utility serving northern and central California. The Utility generates revenues mainly through the sale and delivery of electricity and natural gas to customers.

The Utility is regulated primarily by the CPUC and the FERC. The CPUC has jurisdiction over the rates, terms, and conditions of service for the Utility’s electricity and natural gas distribution operations, electric generation, and natural gas transportation and storage. The FERC has jurisdiction over the rates and terms and conditions of service governing the Utility’s electric transmission operations and interstate natural gas transportation contracts. The NRC oversees the licensing, construction, operation, and decommissioning of the Utility’s nuclear generation facilities. The Utility is also subject to the jurisdiction of other federal, state, and local governmental agencies.

This is a combined quarterly report of PG&E Corporation and the Utility and should be read in conjunction with each company’s separate Condensed Consolidated Financial Statements and the Notes to the Condensed Consolidated Financial Statements included in this Form 10-Q. It also should be read in conjunction with the 2020 Form 10-K.

### Tax Matters

PG&E Corporation expects to have a U.S. federal net operating loss carryforward of approximately $28.1 billion and California net operating loss carryforward of $26.2 billion at the end of 2021.

Under section 382 of the Internal Revenue Code, if a corporation (or a consolidated group) undergoes an “ownership change,” net operating loss carryforwards and other tax attributes may be subject to certain limitations. In general, an ownership change occurs if the aggregate stock ownership of certain shareholders (generally five percent shareholders, applying certain look-through and aggregation rules) increases by more than 50% over such shareholders’ lowest percentage ownership during the testing period (generally three years). PG&E Corporation’s and the Utility’s Amended Articles limit Transfers (as defined in the Amended Articles) that increase a person’s or entity’s (including certain groups of persons) ownership of PG&E Corporation’s equity securities to 4.75% or more prior to the Restriction Release Date without approval by the Board of Directors (the “Ownership Restrictions”). As discussed below under “Update on Ownership Restrictions in PG&E Corporation’s Amended Articles,” the calculation of the Percentage Ownership (as defined in the Amended Articles) may differ depending on whether the Fire Victim Trust is treated as a qualified settlement trust or grantor trust. As of the date of this report, it is more likely than not that PG&E Corporation has not undergone an ownership change, and consequently, its net operating loss carryforwards and other tax attributes are not limited by section 382 of the Internal Revenue Code.

In addition, the tax deduction recorded reflects PG&E Corporation’s conclusion as of March 31, 2021 that it is more likely than not that the Fire Victim Trust will be treated as a “qualified settlement fund” for U.S. federal income tax purposes, in which case the corresponding tax deduction occurred at the time transfers of cash and other property (including PG&E Corporation common stock) were made to the Fire Victim Trust. In January 2021, PG&E Corporation received an IRS ruling that states the Utility is eligible to make a grantor trust election for U.S. federal income tax purposes with respect to the Fire Victim Trust and addressed certain, but not all, related issues. PG&E Corporation believes benefits associated with “grantor trust” treatment, including, a potentially larger tax deduction related to the proceeds realized by the Fire Victim Trust from the sale of shares contributed to the Fire Victim Trust, could be realized, but only if PG&E Corporation and the Fire Victim Trust can meet certain requirements of the Internal Revenue Code and Treasury Regulations thereunder, relating to sales of PG&E Corporation common stock. PG&E Corporation expects to elect grantor trust treatment if it is able to enter into a definitive agreement regarding the same with the Fire Victim Trust. On April 28, 2021, the Bankruptcy Court issued an oral ruling that it would approve the material terms of an agreement between PG&E Corporation, the Utility, and the Fire Victim Trust that supports the election of the grantor trust treatment. There can be no assurance that the parties will execute a definitive agreement or that PG&E Corporation will be able to avail itself of the benefits of a grantor trust election.

At December 31, 2020, PG&E Corporation’s Consolidated Financial Statements reflect “qualified settlement fund” treatment. If PG&E Corporation were to make a “grantor trust” election for the Fire Victim Trust, the Utility’s tax deduction will occur instead at the time the Fire Victim Trust pays the fire victims and will be impacted by the price at which the Fire Victim Trust sells the shares. Therefore, $5.4 billion of cash and $4.54 billion of PG&E Corporation common stock, in the aggregate $10.0 billion that was transferred to the Fire Victim Trust in 2020 will not be deductible for tax purposes until the trust pays the fire victims. Consequently, PG&E Corporation’s net operating loss will decrease by approximately $10.0 billion. In addition, there will be a $1.3 billion charge, net of tax, decreasing net deferred tax assets by $1.3 billion on its Consolidated Financial Statements for activity through December 31, 2020. PG&E Corporation will subsequently recognize income tax benefits and the corresponding deferred tax asset as the Fire Victim Trust sells the shares. The value of the deduction may be materially different than the value of the deduction if the Fire Victim Trust were to be treated as a “qualified settlement fund.”

### Update on Ownership Restrictions in PG&E Corporation’s Amended Articles

The Plan contemplates that the Fire Victim Trust will be treated as a “qualified settlement fund” for U.S. federal and state income tax purposes, subject to PG&E Corporation’s ability to elect to treat the Fire Victim Trust as a “grantor trust” for U.S. federal and state income tax purposes instead. Based on the facts known to date, PG&E Corporation believes the “grantor trust” treatment would be favorable for U.S. federal and state income tax purposes. (See “Tax Matters” above for more information.)

If PG&E Corporation were to make a “grantor trust” election with respect to the Fire Victim Trust, then any shares owned by the Fire Victim Trust would effectively be excluded from the total number of outstanding equity securities when calculating a person’s percentage ownership for purposes of the 4.75% ownership limitation in the Amended Articles. For example, although PG&E Corporation had 1,985,105,703 shares outstanding as of April 26, 2021, only 1,507,362,113 shares (the number of outstanding shares of common stock less the number of shares held by the Fire Victim Trust) would count as outstanding for purposes of the ownership restrictions in the Amended Articles. As such, based on the total number of outstanding equity securities and assuming the Fire Victim Trust has not sold any shares of PG&E Corporation common stock, a person’s effective percentage ownership limitation for purposes of the Amended Articles would be 3.6%. As of April 26, 2021, to the knowledge of PG&E Corporation, the Fire Victim Trust had not sold any shares of PG&E Corporation common stock.

### Summary of Changes in Net Income and Earnings per Share

PG&E Corporation’s net income was $120 million for the three months ended March 31, 2021, compared to $371 million in the same period in 2020. In the three months ended March 31, 2021, PG&E Corporation recognized additional base revenues authorized in the 2020 GRC and 2019 GT&S rate cases, as compared to the same period in 2020. This increase was partially offset by wildfire-related claims, net of insurance recoveries of $172 million associated with the 2019 Kincade fire and the 2020 Zogg fire for the three months ended March 31, 2021, with no similar charge in the same period of 2020. Additionally, PG&E Corporation recognized $119 million in wildfire fund amortization and accretion expense for the three months ended March 31, 2021, with no similar charge in the same period during 2020.

### Key Factors Affecting Financial Results

PG&E Corporation and the Utility believe that their financial condition, results of operations, liquidity, and cash flows may be materially affected by the following factors:

- *The Uncertainties in Connection with Any Future Wildfires, Wildfire Insurance, and AB 1054.* While PG&E Corporation and the Utility cannot predict the occurrence, timing or extent of damages in connection with future wildfires, factors such as environmental conditions (including weather and vegetation conditions) and the efficacy of wildfire risk mitigation initiatives are expected to influence the frequency and severity of future wildfires. To the extent that future wildfires occur in the Utility’s service territory, the Utility may incur costs associated with the investigations of the causes and origins of such fires, even if it is subsequently determined that such fires were not caused by the Utility’s facilities. The financial impact of future wildfires could be mitigated through insurance, the Wildfire Fund or other forms of cost recovery. However, the Utility may not be able to obtain sufficient wildfire insurance coverage at a reasonable cost, or at all, and any such coverage may include limitations that could result in substantial uninsured losses depending on the amount and type of damages resulting from covered events. Various coverage limitations applicable to different insurance layers could result in material uninsured costs in the future depending on the amount and type of damages resulting from covered events. The Utility will not be able to obtain any recovery from the Wildfire Fund for wildfire-related losses in any year that do not exceed the greater of $1.0 billion in the aggregate and the amount of insurance coverage required under AB 1054. In addition, the policy reforms contemplated by AB 1054 are likely to affect the financial impact of future wildfires on PG&E Corporation and the Utility should any such wildfires occur. The Wildfire Fund is available to the Utility to pay eligible claims for liabilities arising from future wildfires and serves as an alternative to traditional insurance products, provided that the Utility satisfies the conditions to the Utility’s ongoing participation in the Wildfire Fund set forth in AB 1054 and that the Wildfire Fund has sufficient remaining funds. (See “Insurance Coverage” in Note 10 of the Notes to the Condensed Consolidated Financial Statements in Item 1.)

However, the impact of AB 1054 on PG&E Corporation and the Utility is subject to numerous uncertainties, including the Utility’s ability to demonstrate to the CPUC that wildfire-related costs paid from the Wildfire Fund were just and reasonable, and whether the benefits of participating in the Wildfire Fund ultimately outweigh its substantial costs. Finally, even if the Utility satisfies the ongoing eligibility and other requirements set forth in AB 1054, for eligible claims against the Utility arising from wildfires that occurred between July 12, 2019 and the Utility’s emergence from Chapter 11 on July 1, 2020, the availability of the Wildfire Fund to pay such claims would be capped at 40% of the amount of such claims. (See “Wildfire Fund under AB 1054” in Note 10 of the Notes to the Condensed Consolidated Financial Statements in Item 1.)

- *The Uncertainties Regarding the Impact of Public Safety Power Shutoffs.* The Utility’s wildfire risk mitigation initiatives involve substantial and ongoing expenditures and could involve other costs. The extent to which the Utility will be able to recover these expenditures and potential other costs through rates is uncertain. The PSPS program, one of the Utility’s wildfire risk mitigation initiatives outlined in the 2019 WMP and included in the 2020-2022 WMP, has been the subject of significant scrutiny and criticism by various stakeholders, including the California governor, the CPUC and the court overseeing the Utility’s probation. On November 12, 2019, the CPUC issued an order to show cause against the Utility related to implementation of the October 2019 PSPS events, and on November 13, 2019, the CPUC instituted an OII to examine California’s IOUs’ late 2019 PSPS events and to consider enforcement actions. TURN, as an intervenor in the OII to Examine the Late 2019 Public Safety Power Shutoff Events, and Cal Advocates, as an intervenor in the Order to Show Cause Against the Utility Related to Implementation of the October 2019 PSPS Events, each proposed significant financial penalties. If adopted by the CPUC, such penalties could be expected to have a material impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. The PSPS program has had an adverse impact on PG&E Corporation’s and the Utility’s reputation with customers, regulators and policymakers and future PSPS events may increase these negative perceptions. In addition to the 2019 PSPS events, the Utility initiated several PSPS events in the third and fourth quarters of 2020 and one in January 2021 and expects that additional PSPS events will be necessary in future years. (See “OII to Examine the Late 2019 Public Safety Power Shutoff Events” and “OIR to Examine Electric Utility De-energization of Power Lines in Dangerous Conditions” in “Regulatory Matters” below.)
- *The Costs and Execution of Other Wildfire Mitigation Efforts.* In response to the wildfire threat facing California, PG&E Corporation and the Utility have taken aggressive steps to mitigate the threat of catastrophic wildfires, the spread of wildfires should they occur and the impact of PSPS events. PG&E Corporation and the Utility incurred approximately $2.6 billion in connection with the 2019 WMP and incurred approximately $3.4 billion through March 31, 2021 in connection with the 2020-2022 WMP. Although the Utility may seek cost recovery for certain of these expenses and capital expenditures, the Utility has agreed in the Wildfires OII not to seek rate recovery of certain wildfire-related expenses and capital expenditures that it has incurred or will incur in the amount of $1.823 billion in future applications.

The Utility is subject to a number of legal and regulatory requirements related to its wildfire mitigation efforts, which require periodic inspections of electric assets and ongoing reporting related to this work. Although the Utility believes that it has complied substantially with these requirements, it is undertaking a review and has identified instances of noncompliance. The Utility intends to update the CPUC upon the completion of its review. The Utility could face fines, penalties, enforcement action, or other adverse legal or regulatory consequences for the late inspections or other noncompliance related to wildfire mitigation efforts.

While PG&E Corporation and the Utility are committed to taking aggressive wildfire mitigation actions, if additional requirements are imposed that go beyond current expectations, such requirements could have a substantial impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows. For example, the Court overseeing the Utility’s probation in connection with the Utility’s federal criminal proceeding has imposed numerous obligations on the Utility related to its business and operations. The success of the Utility’s wildfire mitigation efforts depends on many factors, including on whether the Utility is able to retain or contract for the workforce necessary to execute its wildfire mitigation actions. (See “U.S. District Court Matters and Probation” and “Order Instituting Investigation into the 2017 Northern California Wildfires and the 2018 Camp Fire” in Note 11 of the Notes to the Condensed Consolidated Financial Statements in Item 1.)

- *The Timing and Outcome of Ratemaking Proceedings.* The Utility’s financial results may be impacted by the timing and outcome of its FERC TO18 and TO19 rate cases, WMCE application, and its ability to timely recover costs not currently in rates, including costs already incurred and future costs tracked in its CEMA, WEMA, WMPMA, FRMMA, CPPMA, VMBA, WMBA, and RTBA. The outcome of regulatory proceedings can be affected by many factors, including intervening parties’ testimonies, potential rate impacts, the Utility’s reputation, the regulatory and political environments, and other factors. The Utility’s ability to seek cost recovery will also be limited as a result of the outcome of the Wildfires OII. (See Notes 4 and 11 of the Notes to the Condensed Consolidated Financial Statements in Item 1 and “Regulatory Matters” below.)
- *The Impact of the 2019 Kincade Fire*. Claims related to the 2019 Kincade fire that were not satisfied in full as of the Effective Date were not discharged in connection with emerging from Chapter 11. On July 16, 2020, Cal Fire issued a press release stating that it had determined that “the Kincade fire was caused by electrical transmission lines owned and operated by Pacific Gas and Electric (PG&E).” On April 6, 2021, the Sonoma County District Attorney’s Office, charged the Utility with 5 felonies and 28 misdemeanors in connection with the 2019 Kincade fire. Accordingly, if PG&E Corporation or the Utility were determined to be liable for the 2019 Kincade fire, such liabilities could be significant and could exceed or be excluded from the amounts available under applicable insurance policies or the Wildfire Fund under AB 1054, which could have a material impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows. As of March 31, 2021, PG&E Corporation and the Utility had recorded a loss of $800 million for the 2019 Kincade fire (before available insurance), which amount corresponds to the lower end of the range of reasonably estimable probable losses, but does not include all categories of potential damages and losses. If the Utility were to be convicted of certain charges in the criminal complaint, the Utility could be subject to material fines, penalties, and restitution, as well as non-monetary remedies such as oversight requirements, and accordingly the Utility currently believes that, depending on which charges it were to be convicted of, its total losses associated with the 2019 Kincade fire would materially exceed the $800 million aggregate liability that PG&E Corporation and the Utility have recorded. If the liability for the 2019 Kincade fire were to exceed $1.0 billion, it is possible the Utility would be eligible to make a claim to the Wildfire Fund under AB 1054 for such excess amount, subject to the 40% limitation on claims arising before emergence from bankruptcy and the other limitations and requirements under AB 1054. As of March 31, 2021, the Utility had also recorded an insurance receivable for $430 million. However, the Utility does not expect that any of its liability insurance would cover restitution payments ordered by the court presiding over the criminal proceeding. (See “2019 Kincade Fire” in Note 10 of the Notes to the Condensed Consolidated Financial Statements in Item 1 for more information.)
- *The Impact of the 2020 Zogg Fire.* There were numerous wildfires in the Utility’s service territory during the 2020 wildfire season. If the Utility were alleged or determined to be a cause of one or more of these wildfires, this allegation or determination could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. On October 9, 2020 Cal Fire informed the Utility that it had taken possession of Utility equipment as part of Cal Fire’s ongoing investigation into the 2020 Zogg fire. On March 22, 2021, Cal Fire issued a press release with its determination that the 2020 Zogg fire was caused by a pine tree contacting electrical facilities. Cal Fire also indicated that its investigative report has been forwarded to the Shasta County District Attorney’s Office, which is investigating the matter. Accordingly, if PG&E Corporation or the Utility were determined to be liable for the 2020 Zogg fire, such liabilities could be significant and could exceed or be excluded from the amounts available under applicable insurance policies or the Wildfire Fund under AB 1054, which could be expected to have a material impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows. As of March 31, 2021, PG&E Corporation and the Utility had recorded a loss of $300 million for the 2020 Zogg fire (before available insurance), which amount corresponds to the lower end of the range of reasonably estimable probable losses, but does not include all categories of potential damages. As of March 31, 2021, the Utility had also recorded an insurance receivable for $247 million in connection with the 2020 Zogg fire. (For more information see “2020 Zogg Fire” in Note 10 of the Notes to the Condensed Consolidated Financial Statements in Item 1.)
- *The Impact of the COVID-19 Pandemic.* PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows have been and could continue to be significantly affected by the outbreak of COVID-19. The principal areas of near-term impact include liquidity, financial results and business operations, stemming primarily from the ongoing economic hardship of the Utility’s customers, the moratorium on service disconnections for residential and small business customers and for eligible medium and large commercial and industrial customers, the CPUC’s “Emergency Authorization and Order Directing Utilities to Implement Emergency Customer COVID-19 Protections” and an observed reduction in non-residential electrical load. The Utility continues to monitor the overall impact of the COVID-19 pandemic; however, the Utility expects a significant impact on monthly cash collections as long as current circumstances persist. As of March 31, 2021, PG&E Corporation and the Utility had access to approximately $3.6 billion of total liquidity comprised of approximately $127 million of Utility cash, $102 million of PG&E Corporation cash and $3.4 billion of availability under the Utility and PG&E Corporation credit facilities. Other potential impacts of COVID-19 on PG&E Corporation and the Utility include operational disruptions, workforce disruptions, both in personnel availability (including a reduction in contract labor resources) and deployment, delays in production and shipping of materials used in the Utility’s operations, a reduction in revenue due to the cost of capital adjustment mechanism, the potential for higher credit spreads and borrowing costs and incremental financing needs. The Utility has established a memorandum account for tracking costs related to the CPUC’s emergency authorization and order, which, as of March 31, 2021, was $132 million. The Utility intends to seek recovery of this balance in a future application, subject to CPUC reasonableness review. For more information on the impact of COVID-19 on PG&E Corporation and the Utility, see “PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows have been and could continue to be significantly affected by the outbreak of the COVID-19 pandemic” in Item 1A Risk Factors in Part I of the 2020 Form 10-K.

PG&E Corporation and the Utility expect additional financial impacts in the future as a result of COVID-19. PG&E Corporation and the Utility continue to evaluate the overall impact of COVID-19 and their analysis is subject to change.

- *The Outcome of Other Enforcement, Litigation, and Regulatory Matters, and Other Government Proposals.* The Utility’s financial results may continue to be impacted by the outcome of other current and future enforcement, litigation, and regulatory matters, including those described above as well as the outcome of the OII into PG&E Corporation’s and the Utility’s Safety Culture, the sentencing terms of the Utility’s January 27, 2017 federal criminal conviction, including the oversight of the Utility’s probation and the potential recommendations by the Monitor, and potential penalties in connection with the Utility’s safety and other self-reports. (See Note 11 of the Notes to the Condensed Consolidated Financial Statements in Item 1.) In addition, the Utility’s business profile and financial results could be impacted by the outcome of recent calls for municipalization of part or all of the Utility’s businesses, offers by municipalities and other public entities to acquire the electric assets of the Utility within their respective jurisdictions and calls for state intervention, including the possibility of a state takeover of the Utility. PG&E Corporation and the Utility cannot predict the nature, occurrence, timing or extent of any such scenario, and there can be no assurance that any such scenario would not involve significant ownership or management changes to PG&E Corporation or the Utility, including by the state of California. Further, certain parties filed notices of appeal with respect to the Confirmation Order, including provisions related to the injunction contained in the Plan that channels certain pre-petition fire-related claims to trusts to be satisfied from the trusts’ assets. There can be no assurance that any such appeal will not be successful and, if successful, that any such appeal would not have a material adverse effect on PG&E Corporation and the Utility.
- *The Uncertainties in Connection with the Enhanced Oversight and Enforcement Process.* On April 15, 2021, the CPUC placed the Utility in step 1 of the EOEP. As a result, the Utility will be subject to additional reporting requirements, monitoring, and oversight by the CPUC. (See “Enhanced Oversight and Enforcement Process” in “Enforcement and Litigation Matters” below.)

For more information about the risks that could materially affect PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows, or that could cause future results to differ from historical results, see “Item 1A. Risk Factors” in this Form 10-Q and the 2020 Form 10-K. In addition, this quarterly report contains forward-looking statements that are necessarily subject to various risks and uncertainties. These statements reflect management’s judgment and opinions that are based on current estimates, expectations, and projections about future events and assumptions regarding these events and management’s knowledge of facts as of the date of this report. See the section entitled “Forward-Looking Statements” above for a list of some of the factors that may cause actual results to differ materially. PG&E Corporation and the Utility are unable to predict all the factors that may affect future results and do not undertake an obligation to update forward-looking statements, whether in response to new information, future events, or otherwise.

### RESULTS OF OPERATIONS

The following discussion presents PG&E Corporation’s and the Utility’s operating results for the three months ended March 31, 2021 and 2020. See “Key Factors Affecting Financial Results” above for further discussion about factors that could affect future results of operations.

The consolidated results of operations consist primarily of results related to the Utility, which are discussed in the “Utility” section below. The following table provides a summary of net income (loss) attributable to common shareholders for the three months ended March 31, 2021 and 2020:

*(in millions)*

|  | Three Months Ended March 31, 2021 | 2020 |
| --- | ---: | ---: |
| Consolidated Total | $120 | $371 |
| PG&E Corporation | (54) | (77) |
| Utility | $174 | $448 |

PG&E Corporation’s net loss primarily consists of income taxes and interest expense on long-term debt. PG&E Corporation’s net loss for the three months ended March 31, 2020 also included reorganization items.

### Utility

The table below shows certain items from the Utility’s Condensed Consolidated Statements of Income for the three months ended March 31, 2021 and 2020. The table separately identifies the revenues and costs that impacted earnings from those that did not impact earnings. In general, expenses the Utility is authorized to pass through directly to customers (such as costs to purchase electricity and natural gas, as well as costs to fund public purpose programs), and the corresponding amount of revenues collected to recover those pass-through costs, do not impact earnings. In addition, expenses that have been specifically authorized (such as energy procurement costs) and the corresponding revenues the Utility is authorized to collect to recover such costs do not impact earnings.

Revenues that impact earnings are primarily those that have been authorized by the CPUC and the FERC to recover the Utility’s costs to own and operate its assets and to provide the Utility an opportunity to earn its authorized rate of return on rate base. Expenses that impact earnings are primarily those that the Utility incurs to own and operate its assets.

*(in millions)*

|  | Three Months Ended March 31, 2021 Revenues/Costs: That Impacted Earnings | That Did Not Impact Earnings | Total Utility | Three Months Ended March 31, 2020 Revenues/Costs: That Impacted Earnings | That Did Not Impact Earnings | Total Utility |
| --- | ---: | ---: | ---: | ---: | ---: | ---: |
| Electric operating revenues | $2,343 | $1,052 | $3,395 | $2,155 | $885 | $3,040 |
| Natural gas operating revenues | 897 | 424 | 1,321 | 864 | 402 | 1,266 |
| **Total operating revenues** | **3,240** | **1,476** | **4,716** | **3,019** | **1,287** | **4,306** |
| Cost of electricity | — | 590 | 590 | — | 545 | 545 |
| Cost of natural gas | — | 307 | 307 | — | 284 | 284 |
| Operating and maintenance | 1,708 | 623 | 2,331 | 1,463 | 502 | 1,965 |
| Wildfire-related claims, net of insurance recoveries | 172 | — | 172 | — | — | — |
| Wildfire Fund expense | 119 | — | 119 | — | — | — |
| Depreciation, amortization, and decommissioning | 888 | — | 888 | 855 | — | 855 |
| **Total operating expenses** | **2,887** | **1,520** | **4,407** | **2,318** | **1,331** | **3,649** |
| **Operating income (loss)** | **353** | **(44)** | **309** | **701** | **(44)** | **657** |
| Interest income | 2 | — | 2 | 16 | — | 16 |
| Interest expense | (348) | — | (348) | (252) | — | (252) |
| Other income, net | 89 | 44 | 133 | 49 | 44 | 93 |
| Reorganization items, net | (2) | — | (2) | (93) | — | (93) |
| Income before income taxes | $94 | $— | $94 | $421 | $— | $421 |
| Income tax benefit (1) |  |  | (83) |  |  | (30) |
| Net income |  |  | 177 |  |  | 451 |
| Preferred stock dividend requirement (1) |  |  | 3 |  |  | 3 |
| **Income Attributable to Common Stock** |  |  | **$174** |  |  | **$448** |

(1) These items impacted earnings for the three months ended March 31, 2021 and 2020.

### Utility Revenues and Costs that Impacted Earnings

The following discussion presents the Utility’s operating results for the three months ended March 31, 2021 and 2020, focusing on revenues and expenses that impacted earnings for these periods.

### Operating Revenues

The Utility’s electric and natural gas operating revenues that impacted earnings increased by $221 million, or 7%, in the three months ended March 31, 2021, compared to the same period in 2020, primarily due to an increase in base revenues authorized in the 2020 GRC and 2019 GT&S rate cases.

### Operating and Maintenance

The Utility’s operating and maintenance expenses that impacted earnings increased by $245 million or 17% in the three months ended March 31, 2021, compared to the same period in 2020, primarily due to an increase in insurance costs of approximately $200 million. Additionally, the Utility recognized $79 million in previously deferred costs recorded in conjunction with interim rate relief associated with the WMCE application (see “Wildfire Mitigation and Catastrophic Events Costs Recovery Application” below) in the three months ended March 31, 2021, with no comparable costs in the same period in 2020. These increases are partially offset by clean-up and repair costs of $43 million relating to the 2019 Kincade fire incurred in the three months ended March 31, 2020, with no comparable costs during the same period in 2021.

### Wildfire-related claims, net of insurance recoveries

Costs related to wildfires that impacted earnings increased by $172 million, or 100%, in the three months ended March 31, 2021, compared to the same period in 2020. The Utility recognized pre-tax charges of $175 million related to the 2019 Kincade fire and pre-tax charges of $25 million related to the 2020 Zogg fire, offset by $28 million of probable insurance recoveries in the three months ended March 31, 2021, with no comparable costs during the same period in 2020.

### Wildfire Fund expense

Wildfire Fund expense that impacted earnings increased by $119 million, or 100%, in the three months ended March 31, 2021, compared to the same period in 2020. During the quarter ended June 30, 2020, the Utility became eligible to participate in the Wildfire Fund and as a result began to record amortization and accretion expense related to the Wildfire Fund coverage.

### Depreciation, Amortization, and Decommissioning

The Utility’s depreciation, amortization, and decommissioning expenses that impacted earnings increased by $33 million, or 4%, in the three months ended March 31, 2021, compared to the same period in 2020, primarily due to capital additions.

### Interest Income

There was no material change to interest income that impacted earnings for the periods presented.

### Interest Expense

Interest expense that impacted earnings increased by $96 million, or 38%, in the three months ended March 31, 2021, compared to the same period in 2020 primarily due to the issuance of new debt in connection with emergence from Chapter 11.

### Other Income, Net

Other income, net increased by $40 million, or 82%, in the three months ended March 31, 2021, compared to the same period in 2020, due to the decrease in the discount rate resulting in lower expenses on non-service pension costs.

### Reorganization items, net

Reorganization items, net decreased by $91 million, or 98% in the three months ended March 31, 2021, compared to the same period in 2020, primarily due to the Utility’s emergence from Chapter 11 on July 1, 2020.

### Income Tax Benefit

Income tax benefit increased by $53 million in the three months ended March 31, 2021, compared to the same period in 2020, primarily due to lower pre-tax income in 2021, compared to the same period in 2020.

The following table reconciles the income tax expense at the federal statutory rate to the income tax provision:

|  | Three Months Ended March 31, 2021 | 2020 |
| --- | ---: | ---: |
| Federal statutory income tax rate | 21.0% | 21.0% |
| Increase (decrease) in income tax rate resulting from: |  |  |
| State income tax (net of federal benefit) (1) | (16.7)% | 1.0% |
| Effect of regulatory treatment of fixed asset differences (2) | (101.5)% | (23.4)% |
| Tax credits | (3.1)% | (0.4)% |
| Other, net | 13.1% | (5.2)% |
| **Effective tax rate** | **(87.2)%** | **(7.0)%** |

(1) Includes the effect of state flow-through ratemaking treatment.

(2) Includes the effect of federal flow-through ratemaking treatment for certain property-related costs. For these temporary tax differences, the Utility recognizes the deferred tax impact in the current period and records offsetting regulatory assets and liabilities. Therefore, the Utility’s effective tax rate is impacted as these differences arise and reverse. The Utility recognizes such differences as regulatory assets or liabilities as it is probable that these amounts will be recovered from or returned to customers in future rates. In 2021 and 2020, the amounts also reflect the impact of the amortization of excess deferred tax benefits to be refunded to customers as a result of the Tax Act passed in December 2017.

### Utility Revenues and Costs that Did Not Impact Earnings

Fluctuations in revenues that did not impact earnings are primarily driven by procurement costs. See below for more information.

### Cost of Electricity

The Utility’s cost of electricity includes the cost of power purchased from third parties (including renewable energy resources), fuel and associated transmission costs used in its own generation facilities, fuel and associated transmission costs supplied to other facilities under power purchase agreements, costs to comply with California’s cap-and-trade program, and realized gains and losses on price risk management activities. Cost of electricity also includes net sales (Utility owned generation and third parties) in the CAISO electricity markets. (See Note 8 of the Notes to the Condensed Consolidated Financial Statements in Item 1.) The Utility’s total purchased power is driven by customer demand, net CAISO electricity market activities (purchases or sales), the availability of the Utility’s own generation facilities (including Diablo Canyon and its hydroelectric plants), and the cost-effectiveness of each source of electricity.

*(in millions)*

|  | Three Months Ended March 31, 2021 | 2020 |
| --- | ---: | ---: |
| Cost of purchased power, net | $530 | $473 |
| Fuel used in generation facilities | 60 | 72 |
| **Total cost of electricity** | **$590** | **$545** |

### Cost of Natural Gas

The Utility’s cost of natural gas includes the costs of procurement, storage and transportation of natural gas, costs to comply with California’s cap-and-trade program, and realized gains and losses on price risk management activities. (See Note 8 of the Notes to the Condensed Consolidated Financial Statements in Item 1.) The Utility’s cost of natural gas is impacted by the market price of natural gas, changes in the cost of storage and transportation, and changes in customer demand.

*(in millions)*

|  | Three Months Ended March 31, 2021 | 2020 |
| --- | ---: | ---: |
| Cost of natural gas sold | $270 | $253 |
| Transportation cost of natural gas sold | 37 | 31 |
| **Total cost of natural gas** | **$307** | **$284** |

75

### Operating and Maintenance Expenses

The Utility’s operating expenses that did not impact earnings include certain costs that the Utility is authorized to recover as incurred. If the Utility were to spend more than authorized amounts, these expenses could have an impact to earnings.

### Other Income, Net

The Utility’s other income, net that did not impact earnings includes pension and other post-retirement benefit costs that fluctuate primarily from market and interest rate changes.

### LIQUIDITY AND FINANCIAL RESOURCES

### Overview

The Utility’s ability to fund operations, finance capital expenditures, make scheduled principal and interest payments, and make distributions to PG&E Corporation depends on the levels of its operating cash flows and access to the capital and credit markets. The CPUC authorizes the Utility’s capital structure, the aggregate amount of long-term and short-term debt that the Utility may issue, and the revenue requirements the Utility is able to collect to recover its cost of capital. The Utility generally utilizes retained earnings, equity contributions from PG&E Corporation and long-term debt issuances to maintain its CPUC-authorized long-term capital structure consisting of 52% equity and 48% debt and preferred stock and relies on short-term debt, including its revolving credit facilities, to fund temporary financing needs. On May 28, 2020, the CPUC approved a final decision in the Chapter 11 Proceedings OII, which, among other things, grants the Utility a temporary, five-year waiver from compliance with its authorized capital structure for the financing in place upon the Utility’s emergence from Chapter 11.

PG&E Corporation’s ability to fund operations, make scheduled principal and interest payments, and fund equity contributions to the Utility, depends on the level of cash on hand, cash distributions received from the Utility, and PG&E Corporation’s access to the capital and credit markets.

PG&E Corporation’s and the Utility’s credit ratings may be affected by the ultimate outcome of pending enforcement and litigation matters. Credit rating downgrades may increase the cost and availability of short-term borrowings, including credit facilities and long-term debt costs. In addition, some of the Utility’s commodity contracts contain collateral posting provisions tied to the Utility’s credit rating from each of the major credit rating agencies. The collateral posting provisions for some of the Utility’s power and natural gas commodity, and transportation and service agreements state that if the Utility’s credit ratings were to fall below investment grade, the Utility would be required to post additional cash immediately to fully collateralize some or all of its net liability positions. The Utility’s credit ratings fell below investment grade in January 2019, at which time the Utility was required to post additional collateral under its commodity purchase agreements. A further downgrade would not materially impact the collateral postings for procurement activity. (See Notes 8 and 11 of the Notes to the Condensed Consolidated Financial Statements in Item 1.).

As a result of the outbreak of COVID-19, PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows have been and could continue to be significantly affected by the outbreak of COVID-19. The Utility continues to evaluate the overall impact of the COVID-19 pandemic; however, the Utility expects a significant impact on monthly cash collections as long as current circumstances persist, including the moratorium on service disconnections for residential and small business customers, as well as for medium and large commercial and industrial customers through June 30, 2021. The Utility’s customer energy accounts receivable balances over 30 days outstanding as of March 31, 2021, were approximately $965 million, or $544 million higher as compared to the balance as of March 31, 2020. The Utility is unable to estimate the portion of the increase directly attributable to the COVID-19 pandemic. The Utility expects to continue experiencing an impact on monthly cash collections in 2021 and for as long as current COVID-19 circumstances persist.

The outbreak of COVID-19 and the resulting economic conditions and government orders have had and will continue to have a significant adverse impact on the Utility’s customers and, as a result, these circumstances have and will continue to impact the Utility for an indeterminate period of time. Although the Utility is seeking regulatory relief to mitigate the impact of the consequences of the COVID-19 pandemic, there can be no assurance that any relief is forthcoming or that, if any relief measures are implemented, the timing that any such relief would impact the Utility. On April 16, 2020, the CPUC approved a resolution that authorizes utilities to establish memorandum accounts to track incremental costs associated with complying with the customer protections described within the resolution. On May 1, 2020, the Utility submitted an advice letter with the CPUC, describing all reasonable and necessary actions to implement emergency customer protections through April 16, 2021, which was subsequently updated on June 2, 2020, and July 15, 2020, to modify and clarify the filing based on CPUC guidance. On July 27, 2020, the CPUC approved the Utility’s advice letter. In February and March 2021, the CPUC extended the moratorium on service disconnections to June 30, 2021. In addition, on April 19, 2021, the CPUC issued a final decision to implement a temporary moratorium on service disconnection for medium and large commercial and industrial customers through June 30, 2021. (See “Emergency Authorization and Order Directing Utilities to Implement Emergency Customer COVID-19 Protections” below for more information.)

### Cash, Cash Equivalents, and Restricted Cash

Cash and cash equivalents consist of cash and short-term, highly liquid investments with original maturities of three months or less. PG&E Corporation and the Utility maintain separate bank accounts and primarily invest their cash in money market funds. In addition to cash and cash equivalents, the Utility holds restricted cash that primarily consists of cash held in escrow to be used to pay bankruptcy related professional fees.

### Financial Resources

### Sale of Transmission Tower Wireless Licenses

On February 16, 2021, the Utility granted to a subsidiary of SBA Communications Corporation (such subsidiary, “SBA”) an exclusive license enabling SBA to sublicense and market wireless communications equipment attachment locations (“Cell Sites”) on more than 700 of the Utility’s electric transmission towers, telecommunications towers, monopoles, buildings or other structures (collectively, the “Effective Date Towers”) to wireless telecommunication carriers (“Carriers”) for attachment of wireless communications equipment, as contemplated by a Master Transaction Agreement (the “Transaction Agreement”) dated February 2, 2021, between the Utility and SBA. Pursuant to the Transaction Agreement, the Utility also assigned to SBA license agreements between the Utility and Carriers for substantially all of the existing Cell Sites on the Effective Date Towers.

The exclusive license was granted pursuant to a Master Multi-Site License Agreement (the “License Agreement”) between the Utility and SBA. The term of the License Agreement is for 100 years. The Utility has the right to terminate the license for individual Cell Sites for certain regulatory or utility operational reasons, with a corresponding payment to SBA. Pursuant to the License Agreement, SBA is entitled to the sublicensing revenue generated by new sublicenses of Cell Sites on the Effective Date Towers, subject to the Utility’s right to a percentage of such sublicensing revenue.

The Utility and SBA also entered into a Master Transmission Tower Site License Agreement (the “Tower Site Agreement”), pursuant to which SBA received the exclusive rights to sublicense and market additional attachment locations on up to 28,000 of the Utility’s other electric transmission towers to Carriers for attachment of wireless communications equipment. The Tower Site Agreement provides for a split of license fees from Carriers between the Utility and SBA. The Tower Site Agreement has a licensing period of up to 15 years, depending on SBA’s achievement of certain performance metrics, and any sites licensed during such licensing period will continue to be subject to the Tower Site Agreement for the same term as the License Agreement.

In addition, the Utility and SBA entered into a Pipeline Cell Site Transaction Agreement pursuant to which the Utility and SBA established terms and conditions for adding additional cell sites under the License Agreement. Pipeline Cell Sites are locations where the Utility was in the process of locating a new Cell Site for a wireless carrier at the close of the transaction.

In exchange for the exclusive license and entry into the License Agreement, SBA agreed to pay the Utility a purchase price of $973 million. SBA paid the Utility $946 million of such purchase price at the closing pursuant to the Transaction Agreement, which also contemplates the post-closing assignment of additional specified Cell Sites to SBA upon the satisfaction of certain terms and conditions, for which SBA will make additional purchase price payments to the Utility. The closing settlement also reflected an adjustment for an estimated amount of payments received by the Utility from Carriers in the pre-closing period that are allocable to licenses in the post-closing period. The purchase price is subject to further adjustment pursuant to the terms of the Transaction Agreement through June 30, 2021.

The Utility recorded approximately $365 million of the $946 million sales proceeds as a financing obligation, as this portion of the proceeds for existing Cell Sites represents a sale of future revenues. The Utility recorded approximately $106 million of the $946 million sales proceeds as a contract liability (deferred revenue), as a portion of proceeds with respect to the sublicensing of Cell Sites, as well as the Tower Site Agreement represents an upfront payment for access to space on the Utility’s assets. The Utility utilized a discounted cash flow model based on business assumptions and estimates to determine the allocation of the purchase price between the financing obligation and deferred revenue. The financing obligation and deferred revenue are presented within Other non-current liabilities on the Condensed Consolidated Balance Sheets.

The Utility recorded the remaining approximately $475 million ($471 million of which is noncurrent) of the sale proceeds to a regulatory liability, for the portion that is probable to be returned to customers in accordance with existing revenue sharing practices.

The Utility will amortize the financing obligation through Electric operating revenue and Interest expense on the Condensed Consolidated Statements of Income using the effective interest method and will amortize the deferred revenue balance through Electric operating revenue ratably over the 100-year term.

### Debt Financings

#### Utility

In March 2021, the Utility issued $1.5 billion aggregate principal amount of 1.367% First Mortgage Bonds due March 10, 2023, $450 million aggregate principal amount of 3.25% First Mortgage Bonds due June 1, 2031, and $450 million aggregate principal amount of 4.20% First Mortgage Bonds due June 1, 2041. The proceeds were used for (i) the prepayment of all of the $1.5 billion 364-day term loan facility (maturing June 30, 2021) outstanding under the Utility’s term loan credit agreement, (ii) the repayment of all of the borrowings outstanding under the revolving credit facility pursuant to the revolving credit agreement and (iii) general corporate purposes.

#### PG&E Corporation

On June 23, 2020, PG&E Corporation obtained a $2.75 billion secured term loan (the “Term Loan”) under a term loan credit agreement (the “Term Loan Agreement”). The Term Loan matures on June 23, 2025, unless extended by PG&E Corporation pursuant to the terms of the Term Loan Agreement. In accordance with the Term Loan Agreement, PG&E Corporation is required to repay the principal amount outstanding on the Term Loan in an amount equal to $6.875 million on the last day of each quarter.

On February 1, 2021, PG&E Corporation entered into a repricing amendment with the lenders under the Term Loan Agreement pursuant to which, among other things, the applicable margin was reduced from 450 basis points to 300 basis points and the LIBOR floor was reduced from 100 basis points to 50 basis points.

### Credit Facilities

At March 31, 2021, PG&E Corporation and the Utility had $500 million and $2.9 billion available under their respective $500 million and $6.0 billion credit facilities, including the Utility’s term loan credit facility and Receivables Securitization Programs. The amount the Utility may borrow under the Receivables Securitization Program is limited to the lesser of the facility limit and the facility availability. The facility availability may vary based on the amount of accounts receivable that the Utility owns that are eligible for sale to the SPV and the portion of those accounts receivable that are sold to the SPV that are eligible for advances by the lenders under the Receivables Securitization Program from time to time. As of April 22, 2021, the Receivables Securitization Program had a maximum borrowing base of $888 million and was fully drawn.

For more information, see “Credit Facilities” in Note 5 to the Condensed Consolidated Financial Statements in Item 1.

### Dividends

On December 20, 2017, the Boards of Directors of PG&E Corporation and the Utility suspended quarterly cash dividends on both PG&E Corporation’s and the Utility’s common stock, beginning the fourth quarter of 2017, as well as the Utility’s preferred stock, beginning the three-month period ending January 31, 2018.

Subject to the dividend restrictions as described in Note 6 of the Notes to the Consolidated Financial Statements in Item 8 of the 2020 Form 10-K, any decision to declare and pay dividends in the future will be made at the discretion of the Boards of Directors and will depend on, among other things, results of operations, financial condition, cash requirements, contractual restrictions and other factors that the Boards of Directors may deem relevant. As of March 31, 2021, it is uncertain as to when PG&E Corporation and the Utility will commence the payment of dividends on their common stock and when the Utility will commence the payment of dividends on its preferred stock.

### Utility Cash Flows

The Utility’s cash flows were as follows:

*(in millions)*

|  | Three Months Ended March 31, 2021 | 2020 |
| --- | ---: | ---: |
| Net cash provided by (used in) operating activities | $1,283 | $1,612 |
| Net cash used in investing activities | (1,796) | (1,655) |
| Net cash provided by financing activities | 265 | 476 |
| **Net change in cash, cash equivalents and restricted cash** | **$(248)** | **$433** |

### Operating Activities

The Utility’s cash flows from operating activities primarily consist of receipts from customers less payments of operating expenses, other than expenses such as depreciation that do not require the use of cash. During the three months ended March 31, 2021, net cash provided by operating activities decreased by $329 million compared to the same period in 2020. This decrease was primarily due to the payment of $758 million to the Fire Victim Trust in accordance with the Plan, and payment for interest in the amount of $467 million, with no similar payments made during the same period in 2020. These payments were partially offset by $581 million of cash received from SBA related to a portion of the License Agreement and Tower Site Agreement, with no similar cash receipts in the same period in 2020, and by higher base revenue collections authorized in the 2020 GRC and 2019 GT&S rate cases.

Future cash flow from operating activities will be affected by various factors, including:

- the timing and amount of costs in connection with the 2019 Kincade fire and the timing and amount of related insurance recoveries;
- the timing and amount of costs in connection with the 2020 Zogg fire and the timing and amount of related insurance recoveries;
- the timing and amounts of costs, including fines and penalties, that may be incurred in connection with current and future enforcement, litigation, and regulatory matters (see “Enforcement Matters” in Note 11 of the Notes to the Condensed Consolidated Financial Statements in Item 1 and “Regulatory Matters” below for more information);
- the severity, extent and duration of the global COVID-19 pandemic and its impact on the Utility’s service territory, the ability of the Utility to collect on its customer invoices, the ability of the Utility’s customers to pay their utility bills in full and in a timely manner, the ability of the Utility to offset these effects, including with spending reductions and the ability of the Utility to recover from customers any losses incurred in connection with COVID-19, as well as the impact of COVID-19 on the availability or cost of financing;
- the timing and amounts of annual contributions to the Wildfire Fund and if necessary, the availability of funds to pay eligible claims for liabilities arising from future wildfires;
- the timing and amount of substantially increasing costs in connection with 2020-2022 WMPs and the costs previously incurred in connection with the 2019 WMP that are not currently being recovered in rates (see “Regulatory Matters” below for more information);
- the timing and amount of premium payments related to wildfire insurance (see “Insurance Coverage” in Note 10 of the Notes to the Condensed Consolidated Financial Statements in Item 1 for more information);
- the timing of the final payment to be made to the Fire Victim Trust, pursuant to the terms of the Tax Benefits Payment Agreement (see “Restructuring Support Agreement with the TCC” in Note 10 of the Notes to the Condensed Consolidated Financial Statements in Item 1 for more information);
- the timing of and amount of the gain to be returned to customers from the sale of the SFGO; and
- the timing and outcomes of the FERC TO18 and TO19 rate cases, 2018 CEMA application, WEMA application, WMCE application, future applications for cost recovery of amounts recorded to the FRMMA, CPPMA, WMPMA, VMBA, WMBA and RTBA, future cost of capital proceedings and other ratemaking and regulatory proceedings.

### Investing Activities

Net cash used in investing activities increased by $141 million during the three months ended March 31, 2021 as compared to the same period in 2020. The Utility’s investing activities primarily consist of the construction of new and replacement facilities necessary to provide safe and reliable electricity and natural gas services to its customers. Cash used in investing activities also includes the proceeds from sales of nuclear decommissioning trust investments which are largely offset by the amount of cash used to purchase new nuclear decommissioning trust investments. The funds in the decommissioning trusts, along with accumulated earnings, are used exclusively for decommissioning and dismantling the Utility’s nuclear generation facilities.

Future cash flows used in investing activities are largely dependent on the timing and amount of capital expenditures. The Utility estimates that it will incur between $7.5 billion and $8.3 billion in capital expenditures in 2021 and between $7.8 billion and $8.2 billion in 2022. Additionally, future cash flows from investing activities will be impacted by the timing of and amount received from the proposed sale of the Utility’s SFGO.

### Financing Activities

Net cash provided by financing activities decreased by $211 million during the three months ended March 31, 2021 as compared to the same period in 2020.

Cash provided by or used in financing activities is driven by the Utility’s financing needs, which depend on the level of cash provided by or used in operating activities, the level of cash provided by or used in investing activities, the conditions in the capital markets, and the maturity date or prepayment date of existing debt instruments. Additionally, future cash flows from financing activities will be affected by the timing and outcome of the Utility’s applications for a post-emergence securitization transaction and for a AB 1054 securitization transaction. (See “Application for Post-Emergence Securitization Transaction” and “Application for AB 1054 Securitization Transaction” below for more information.)

### ENFORCEMENT AND LITIGATION MATTERS

PG&E Corporation and the Utility have significant contingencies arising from their operations, including contingencies related to the enforcement and litigation matters described in Notes 10 and 11 of the Notes to the Condensed Consolidated Financial Statements in Item 1. The outcome of these matters, individually or in the aggregate, could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. In addition, PG&E Corporation and the Utility are involved in other enforcement and litigation matters described in the 2020 Form 10-K.

### U.S. District Court Matters and Probation

On August 9, 2016, the jury in the federal criminal trial against the Utility in the United States District Court for the Northern District of California, in San Francisco, found the Utility guilty on one count of obstructing a federal agency proceeding and five counts of violations of pipeline integrity management regulations of the Natural Gas Pipeline Safety Act. On January 26, 2017, the court imposed a sentence on the Utility in connection with the conviction. The court sentenced the Utility to a five-year corporate probation period, oversight by the Monitor for a period of five years, with the ability to apply for early termination after three years, a fine of $3 million to be paid to the federal government, certain advertising requirements, and community service.

The probation includes a requirement that the Utility not commit any local, state, or federal crimes during the probation period. As part of the probation, the Utility has retained the Monitor at the Utility’s expense. The goal of the Monitor is to help ensure that the Utility takes reasonable and appropriate steps to maintain the safety of its gas and electric operations, and to maintain effective ethics, compliance and safety related incentive programs on a Utility-wide basis.

On August 7, 2020, after a number of filings involving different parties, the court entered an order adopting the new conditions jointly proposed by the Utility, the Monitor, and the Department of Justice on June 24, 2020. Among other things, these conditions require the Utility to staff an in-house vegetation inspection manager and approximately 30 additional field inspectors to oversee vegetation management work. Further, the Utility is required to implement a program to assess the age and expected useful life of certain electrical components in high fire-threat areas, incorporate this information into its risk-based asset management programs and provide monthly progress reports to the Monitor. The Utility must also hire additional inspectors to oversee inspections of its transmission assets and implement a 90-day replacement requirement for cold end hardware in high fire-threat areas with an observed material loss approaching 50%.

On December 29, 2020, the court entered an order requiring the Utility to show cause as to why additional proposed conditions of probation should not be added. The proposed conditions would require the Utility to, when determining which distribution lines to de-energize during a PSPS event: (i) take into account the extent to which vegetation bordering those lines is not in compliance with certain requirements, and (ii) to the extent that information shows that such vegetation presents a safety hazard in the event of a windstorm, make a specific determination with respect to that distribution line and de-energize it unless the Utility finds in writing that there are specific reasons to believe that no safety issues exist. The Utility filed its response on January 20, 2021, proposing supplemental language to clarify and specify how the Utility will implement the new conditions proposed by the court. A hearing on the matter was held on February 3, 2021. On February 4, 2021, the court entered an order indicating that, if certain alterations were made, the court may be willing to accept the Utility’s proposed modified conditions in lieu of the conditions proposed in the court’s December 29, 2020 order. The Utility, the CPUC, the California Governor’s Office of Emergency Services, and amici responded to the order on February 19, 2021. The CPUC and the Utility submitted further responses on March 19, 2021 and March 22, 2021, respectively, and the CPUC submitted a correction to its March 19, 2021 submission on March 23, 2021. A hearing was held on March 23, 2021. On March 24, 2021, the court issued an order requiring the Utility to provide, among other information, a revision of the proposed conditions of probation that incorporates consideration of the potential for a tree to fall into an overhead electric line based on its height and distance from the line. The Utility submitted its response on March 29, 2021. On April 20, 2021, the CPUC submitted a letter to the court suggesting further revisions to one of the proposed conditions of probation. On April 21, 2021, the court ordered all parties who wanted to respond to the CPUC’s April 20, 2021 filing to do so by April 26, 2021.

On February 4, 2021, the court entered an order requiring the Utility to show cause as to why the additional proposed conditions of probation suggested by amici in a January 27, 2021 filing should not be added. The proposed conditions would require the Utility to: (i) hire a chief data operations officer with the responsibility to review the Utility’s information management and record-keeping systems and manage the relationship to operations, including vegetation management work and PSPS; (ii) initiate steps to prevent data falsification or omission; (iii) propose a plan to mark trees in tier 2 and tier 3 high wildfire danger zones for removal and track the status of the tree removal process for vegetation management; and (iv) propose steps to improve its information management and records-keeping process to improve information integrity, inform analysis, and inform and enhance daily operations including PSPS. The Utility’s and the United States’ responses were submitted on March 3, 2021, and reply by amici was submitted on March 10, 2021.

On February 18, 2021, the court issued an order requiring the Utility to show cause as to why an additional proposed condition of probation, which would require the Utility to “identify and remove any tree or portion thereof leaning toward any distribution line if it may contact the line from the side or fall on the line and must do so *regardless of the health of the tree\[,\]”* should not be added. The Utility’s response was submitted on March 4, 2021, responses by the United States and the CPUC and Cal Fire (jointly) were submitted on March 11, 2021, and the Utility’s reply was submitted on March 17, 2021. A hearing on the matter was held on March 23, 2021.

On April 20, 2021, the court issued an order requiring the Utility to appear on May 4, 2021 in connection with a potential probation violation based on the charges filed by the Sonoma County District Attorney’s office related to the 2019 Kincade fire.

In the course of 2021, the court entered numerous other orders, including in connection with the Utility’s vegetation management, the Utility’s PSPS program, the 2018 Camp fire, the 2019 Kincade fire, and the 2020 Zogg fire.

The Utility expects to receive additional orders from the court in the future.

### Enhanced Oversight and Enforcement Process

In the OII to Consider PG&E Corporation’s and the Utility’s Plan of Reorganization final decision, the CPUC adopted an EOEP designed to provide a roadmap for how the CPUC will monitor the Utility’s performance on an ongoing basis. The EOEP contains six steps that are triggered by specific events and includes enhanced reporting requirements and additional monitoring and oversight. These trigger events include failure to obtain an approved WMP, failure to comply with regulatory reporting requirements in the WMP, insufficient progress toward approved safety or risk-driven investments and failure to comply with or demonstrate sufficient progress toward certain metrics (some of which will be determined in an ongoing regulatory proceeding). The EOEP also contains provisions for the Utility to cure and permanently exit the EOEP if it can satisfy specific criteria. If the Utility is placed into the EOEP, actions taken would occur in coordination with the CPUC’s existing formal and informal reporting requirements and procedures. The EOEP does not replace or limit the CPUC’s regulatory authority, including the authority to issue Orders to Show Cause and Orders Instituting Investigations and to impose fines and penalties. The EOEP requires the Utility to report the occurrence of a triggering event to the CPUC’s Executive Director no later than five business days after the date on which any member of senior management of the Utility becomes aware of the occurrence of a triggering event.

The Utility is unable to predict whether additional fines or penalties may be imposed, or other regulatory actions may be taken.

#### Vegetation Management

On April 15, 2021, the CPUC placed the Utility into step 1 of the EOEP and will impose additional reporting requirements on the Utility. The CPUC’s resolution states that a step 1 triggering event has occurred because the Utility “has made insufficient progress toward approved safety or risk-driven investments related to its electric business.” The resolution finds that, based on the CPUC’s evaluation of the Utility’s enhanced vegetation management work in 2020, the Utility “is not sufficiently prioritizing its Enhanced Vegetation Management (EVM) based on risk” and “is not making risk-driven investments.” The resolution also finds that “less than five percent of the EVM work” the Utility completed in 2020 “was on the 20 highest risk power lines according to \[its\] own risk rankings.”

As a result, the Utility is required to submit a corrective action plan to the CPUC’s executive director by May 6, 2021, which is designed to correct or prevent recurrence of the step 1 triggering event, or otherwise mitigate any ongoing safety risk or impact, as soon as practicable, among other things. Thereafter, the Utility is required to update the information contained in the corrective action plan every 90 days. The Utility will remain in step 1 of the EOEP until the CPUC determines that the Utility has met the conditions of the corrective action plan. If the Utility does not adequately meet such conditions within the timeframe approved by the CPUC, the CPUC may place the Utility into a higher step of the EOEP, or the Utility may remain in step 1 of the EOEP if it demonstrates sufficient progress towards meeting such conditions.

The Utility is preparing a corrective action plan to address the issues in the draft resolution.

The Utility is unable to predict the outcome of this regulatory process.

### REGULATORY MATTERS

The Utility is subject to substantial regulation by the CPUC, the FERC, the NRC and other federal and state regulatory agencies. The resolutions of the proceedings described below, and other proceedings may materially affect PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. Discussed below are significant regulatory developments that have occurred since filing the 2020 Form 10-K.

### Rate Cases

### 2020 Cost of Capital Proceeding

On December 19, 2019, the CPUC approved a final decision in the 2020 Cost of Capital proceeding, maintaining the Utility’s return on common equity at the 2019 level of 10.25% for the three-year period beginning January 1, 2020. The Utility’s annual cost of capital adjustment mechanism, which allows for changes in the Utility’s authorized ROE and cost of debt, also remains unchanged. In any year in which the difference between the average Moody’s utility bond rates, as measured in the 12-month period from October through September (the index), and 4.5% (the benchmark) exceeds 100 basis points, the Utility’s ROE will be adjusted by one-half of such difference, and the cost of debt will be trued up to the most recent recorded cost of debt. The Utility must initiate this adjustment mechanism by filing an advice letter on or before October 15, to become effective on January 1 of the next year. The mechanism did not trigger in September 2020; however, as of April 27, 2021, the index was more than 100 basis points below the 4.5% benchmark. If the mechanism triggers in October 2021, then for 2022 the ROE and the cost of debt will be adjusted accordingly. The decision maintains the common equity component of the Utility’s capital structure at 52%, and reduces its preferred stock component from 1% to 0.5%. The decision also approves the cost of debt requested by the Utility.

### 2023 General Rate Case

In accordance with a January 16, 2020 CPUC rate case plan decision, the Utility is required to file with the CPUC on June 30, 2021 a single “general rate case” application requesting integrated GRC and GT&S related revenue requirements for test year 2023 and three attrition years. The Utility expects to file the 2023 GRC by June 30, 2021.

On June 30, 2020, the Utility filed the 2020 RAMP Report in advance of its 2023 GRC application. On November 25, 2020, the SPD released its evaluation of the Utility’s 2020 RAMP Report. The SPD found that “\[t\]he 2020 RAMP showed marked improvements in risk modeling rigor, data quality, and transparency over previous rate cases,” but cautioned that the Utility’s “track record calls for continued improvements by PG&E and continued rigorous oversight by the Commission.” On March 24, 2021, TURN submitted a proposal that would require the Utility to provide an alternative forecast in the 2023 GRC corresponding to the rate of inflation. On April 8, 2021, the Utility submitted a filing opposing TURN’s proposal.

### 2015 Gas Transmission and Storage Rate Case

As previously disclosed, in its final decision in the Utility’s 2015 GT&S rate case, the CPUC excluded from rate base $696 million of capital spending in 2011 through 2014. This was the amount forecast to be recorded in excess of the amount adopted in the 2011 GT&S rate case. The decision permanently disallowed $120 million of that amount and ordered that the remaining $576 million be subject to an audit overseen by the CPUC staff, with the possibility that the Utility may seek recovery in a future proceeding. The audit report was released June 2, 2020 and did not recommend any additional disallowances. The 2015 GT&S decision authorized the Utility to seek recovery, through a separate application, of those costs not recommended for disallowance by the audit. On July 31, 2020, the Utility filed an application seeking recovery of $373.3 million in revenue associated with $512 million of recorded capital expenditures. On October 16, 2020, the assigned commissioner issued a scoping memo establishing the scope and schedule for the proceeding. On January 20, 2021, the Utility provided supplemental testimony addressing the reasonableness of the capital expenditures. Intervenors’ testimony was served on April 7, 2021 and the Utility’s rebuttal testimony is due on May 5, 2021. The scoping memo calls for the issuance of a PD in the fourth quarter of 2021.

On November 10, 2020, the Utility filed a motion seeking approximately $100 million in interim rates, assuming the CPUC reaches a final decision in this matter in late 2021 or early 2022. The CPUC has not yet ruled upon the Utility’s motion.

The Utility is unable to predict the timing and outcome of this application.

### Transmission Owner Rate Cases

#### Transmission Owner Rate Cases for 2015 and 2016 (the “TO16” and “TO17” rate cases, respectively)

As previously disclosed, on January 8, 2018, the Ninth Circuit Court of Appeals issued an opinion granting an appeal of the FERC’s decisions in the TO16 and TO17 rate cases that had granted the Utility a 50-basis point ROE incentive adder for its continued participation in the CAISO. If the FERC concluded on remand that the Utility should no longer be authorized to receive the 50 basis point ROE incentive adder, the Utility would incur a refund obligation of $1 million and $8.5 million for TO16 and TO17, respectively. Those rate case decisions were remanded to the FERC for further proceedings consistent with the Court of Appeals’ opinion.

On July 18, 2019, the FERC issued its order on remand reaffirming its prior grant of the Utility’s request for the 50-basis point ROE adder.

On March 17, 2020, the FERC issued an order denying requests for rehearing previously filed by several parties. On May 11, 2020, the CPUC and a number of other parties filed a petition for review of the FERC’s orders in the Ninth Circuit Court of Appeals. Oral argument was held on April 16, 2021. The Utility is unable to predict the timing and outcome of this proceeding.

For more information, see the 2020 Form 10-K.

#### Transmission Owner Rate Case for 2017 (the “TO18” rate case)

As previously disclosed, on July 29, 2016, the Utility filed its TO18 rate case with the FERC requesting a 2017 retail electric transmission revenue requirement of $1.72 billion, a $387 million increase over the 2016 revenue requirement of $1.33 billion. The forecasted network transmission rate base for 2017 was $6.7 billion. The Utility sought a ROE of 10.9%, which included an incentive component of 50 basis points for the Utility’s continuing participation in the CAISO.

Also, as previously disclosed, on October 1, 2018, the ALJ issued an initial decision in the TO18 rate case proposing a ROE of 9.13% compared to the Utility’s request of 10.9%, and an estimated composite depreciation rate of 2.94% compared to the Utility’s request of 3.25%. In addition, the ALJ proposed to reduce forecasted capital and expense spending to actual costs incurred for the rate case period, proposed to remove certain items from the Utility’s rate base and revenue requirement, and rejected the Utility’s direct assignment of common plant to transmission and required the allocation of all common plant between CPUC and FERC jurisdiction be based on operating and maintenance labor ratios.

As previously disclosed, on October 15, 2020, the FERC issued an order that affirmed in part and reversed in part the initial decision. The order, among other things, rejects the Utility’s direct assignment of common plant to FERC and required the allocation of all common plant between CPUC and FERC jurisdiction be based on operating and maintenance labor ratios. The order reopens the record for the limited purpose of allowing the participants to the proceeding an opportunity to present written evidence concerning the FERC’s revised ROE methodology adopted in the FERC Opinion No. 569-A, issued on May 21, 2020. Initial briefs and testimony were filed on December 14, 2020 and responses were filed on February 12, 2021.

As previously disclosed, on December 17, 2020, the FERC denied all the pending requests for rehearing that were previously submitted by the Utility and intervenors. On February 11, 2021, the Utility filed a petition for review of the order in the District of Columbia Court of Appeals, and a separate petition for review was jointly filed the same day by two other parties in the Ninth Circuit of Appeals. The District of Columbia Court of Appeals and the Ninth Circuit of Appeals have issued orders holding the appeals in abeyance until July 14, 2021 and June 30, 2021, respectively, so that the FERC has time to issue a substantive order on rehearing. On April 15, 2021, the FERC issued an order denying the Utility’s request for rehearing and granting the request for rehearing of two parties regarding the impact of the Tax Act on TO18 rates in January and February 2018. The Utility may seek rehearing of the FERC’s reversal on the applicability of the Tax Act on TO18 rates which may affect the timing for judicial review of the FERC order on the Utility’s request for rehearing.

As a result of the FERC’s April 15, 2021 order denying rehearing on the common plant allocation, the Utility increased its Regulatory liabilities for amounts previously collected during the TO18, TO19, and TO20 rate case periods from 2017 through the first quarter of 2021 by approximately $270 million. A portion of these common plant costs are expected to be recovered at the CPUC in a separate application and as a result, the Utility has recorded approximately $150 million to Regulatory assets.

Aside from the ultimate outcome of the common plant allocation, which is subject to further appellate briefing and a further FERC decision on ROE, the FERC’s April 15, 2021 order is not expected to result in a material impact on the Utility’s financial condition, results of operations, liquidity, and cash flows. Some of the issues that will be decided in a final and unappealable TO18 decision, including the common plant allocation, will also be incorporated into the Utility’s TO19 and TO20 rate cases. (See “Transmission Owner Rate Case Revenue Subject to Refund” in Note 11 of the Notes to the Condensed Consolidated Financial Statements in Item 1.)

The Utility is unable to predict the timing and outcome of this proceeding.

For more information, see the 2020 Form 10-K.

### Wildfire Mitigation and Catastrophic Events Costs Recovery Application

On September 30, 2020, the Utility filed an application with the CPUC requesting cost recovery of recorded expenditures related to wildfire mitigation, certain catastrophic events, and a number of other activities (the “WMCE application”). The recorded expenditures, which exclude amounts disallowed as a result of the CPUC’s decision in the OII into the 2017 Northern California Wildfires and the 2018 Camp fire, consist of $1.18 billion in expense and $801 million in capital expenditures, resulting in a proposed revenue requirement of approximately $1.28 billion.

The costs addressed in the WMCE application cover activities mainly during the years 2017 to 2019 and are incremental to those previously authorized in the Utility’s 2017 GRC and other proceedings. The majority of costs addressed in this application reflect work necessary to mitigate wildfire risk and to respond to catastrophic events occurring during the years 2017 to 2019. The Utility’s requested revenue includes amounts for the FHPMA of $293 million, the FRMMA and the WMPMA of $740 million, and the CEMA of $251 million. The requested revenue for CEMA costs reflected in the application include the Utility’s costs incurred responding to ten catastrophic events.

Given the CPUC’s prior approval of $447 million in interim rate relief (which includes interest), the Utility proposed to recover the remaining $868 million revenue requirement, including interest, over a one-year period (following the conclusion of interim rate relief recovery). Cost recovery requested in this application is subject to the CPUC’s reasonableness review, which could result in some or all of the interim rate relief of $447 million being subject to refund.

Intervenors’ testimony was served on April 14, 2021 and the Utility’s rebuttal testimony is due on April 30, 2021. The scoping memo and ruling for the proceeding calls for a PD to be issued in September 2021.

The Utility is unable to predict the outcome of this application. PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows could be materially affected if the Utility is unable to timely recover costs included in this application.

For more information regarding the FHPMA, the FRMMA, the WMPMA, and the CEMA memorandum accounts, see Note 4 of the Notes to the Condensed Consolidated Financial Statements in Item 1 and the 2020 Form 10-K.

### Application for Recovery of Costs Recorded in the Wildfire Expense Memorandum Account

On February 7, 2020, the Utility filed an application seeking recovery of certain costs recorded in the WEMA. In the application, the Utility seeks recovery of $498.7 million for the cost of insurance premiums paid by the Utility between July 26, 2017 through December 31, 2019 that is incremental to the insurance costs already authorized in the 2017 GRC or the 2020 GRC. These incremental costs are not associated with any specific wildfire event. The application does not seek recovery of wildfire claims or associated legal costs eligible for recording to WEMA.

On April 2, 2020, the CPUC held a prehearing conference in this matter. On January 12, 2021, the CPUC issued a scoping memo establishing the scope and schedule for the proceeding. On February 26, 2021, parties served testimony addressing the Utility’s application. The Utility served rebuttal testimony on March 19, 2021. On April 15, 2021, the Utility notified the CPUC that it had reached a settlement in principle with a number of parties in the proceeding.

The Utility is unable to predict the timing and outcome of this proceeding.

For more information see Note 4 of the Notes to the Condensed Consolidated Financial Statements in Item 1.

### Catastrophic Event Memorandum Accounts and Applications

The CPUC allows utilities to recover the reasonable, incremental costs of responding to catastrophic events that have been declared a disaster or state of emergency by competent federal or state authorities through a CEMA. In 2014, the CPUC directed the Utility to perform additional fire prevention and vegetation management work in response to the severe drought in California. The costs associated with this work are tracked in the CEMA. In the 2020 GRC Decision, the CPUC required the Utility to track these costs in the VMBA beginning January 1, 2020. The Utility’s CEMA applications are subject to CPUC review and approval. For more information see Note 4 of the Notes to the Condensed Consolidated Financial Statements in Item 1.

### Emergency Authorization and Order Directing Utilities to Implement Emergency Customer COVID-19 Protections

In response to the COVID-19 pandemic, on April 16, 2020, the CPUC adopted a resolution ordering utilities to implement a number of emergency customer protections for one year beginning on March 4, 2020 through April 16, 2021.

The resolution also authorizes utilities to establish memorandum accounts to track incremental costs associated with complying with the resolution. On February 11, 2021, the CPUC approved a resolution extending the moratorium on service disconnections for residential and small business customers to June 30, 2021. In addition, the February 11, 2021 resolution ordered the utilities to file advice letters containing their respective transition plans associated with the discontinuance of the emergency customer protections on June 30, 2021. The Utility filed its advice letter and transition plan to the CPUC for review on April 1, 2021, which was approved by the CPUC on April 28, 2021.

On June 11, 2020, the CPUC issued a final decision as part of the OIR to Consider New Approaches to Disconnections and Reconnections to Improve Energy Access and Contain Costs that permanently eliminated deposit requirements for residential customers. On April 19, 2021, the CPUC issued a final decision to implement a temporary moratorium on service disconnection for medium and large commercial and industrial customers through June 30, 2021. To be eligible, medium or large commercial or industrial customers must be enrolled in and current on a payment plan by June 30, 2021. The final decision authorized the Utility to submit an advice letter to establish a memorandum account to track incremental costs for the period of December 30, 2020 to June 30, 2021 for this moratorium. The Utility expects to submit the advice letter by May 14, 2021.

PG&E Corporation and the Utility are unable to predict whether this resolution will be extended or expanded to additional customer classes, which could have a material impact on results of operations, financial condition, and cash flows of PG&E Corporation and the Utility.

For more information, see the 2020 Form 10-K.

### Other Regulatory Proceedings

### Application to Sell General Office Complex

On September 30, 2020, the Utility filed an application with the CPUC to sell its SFGO located at 215 Market Street, 245 Market Street, 77 Beale Street, 50 Main Street, 25 Beale Street, and 45 Beale Street in downtown San Francisco, and to recover costs to relocate its staff at SFGO to a new headquarters to the Lakeside Building, and for appropriate ratemaking treatment of those transactions.

The Utility proposes the SFGO sale and headquarters transition proceed in several interrelated steps: the Utility has entered into a lease for the Lakeside Building with an option to purchase the Lakeside Building; the Utility will market and sell the SFGO, subject to CPUC approval; and the Utility will enter into an agreement with the buyer of the SFGO to lease back space during the multi-year relocation period (collectively, the “Transactions”). As space in the Lakeside Building becomes available following the expiration of existing tenants’ leases and completion of the redevelopment of the property to the Utility’s specifications, the Utility will relocate employees and operations from the SFGO and certain East Bay office locations to the Lakeside Building in phases over several years, beginning in 2022.

In this application, the Utility requests that the CPUC: (i) authorize the Utility to sell the SFGO pursuant to Public Utilities Code section 851, (ii) approve the Utility’s ratemaking proposal to distribute all of the gain on sale of the SFGO to customers over five years, beginning in 2022, (iii) approve the recovery of costs to lease back the SFGO after the buildings are sold, costs to lease the Lakeside Building, and other transition costs, and (iv) authorize the Utility to forecast the intended purchase of the Lakeside Building and include it in the Utility’s 2023 GRC. The Utility also proposes to establish a balancing account to record lease payments, net savings or costs on operating expense and capital expense, gain on sale, moving costs and related costs for inclusion in electric and gas rates.

On December 15, 2020, the assigned commissioner issued a scoping memo, which contemplates a CPUC final decision as early as August 2021 and provides for additional timeline flexibility depending on the pace of the sale process. On April 21, 2021, the Utility entered into a settlement agreement with certain other parties and submitted the settlement agreement to the CPUC for approval. Under the settlement, the parties agree that (1) the Utility’s headquarters strategy, including the move to Oakland, the sale of SFGO, and the terms of the agreement to lease and the option to purchase the Lakeside Building, is reasonable, (2) all of the gain on sale of SFGO will be returned to customers over five years, beginning in 2022, and (3) the SFGO sale terms and the costs associated with the Utility’s move to the Lakeside Building and development will be considered at later stages of the proceeding and through the CPUC’s advice letter process.

The Utility launched the marketing of the SFGO in March 2021.

PG&E Corporation and the Utility are unable to predict the timing and outcome of this proceeding.

### Application for Post-Emergence Securitization Transaction

On April 30, 2020, the Utility filed an application with the CPUC seeking authorization for a post-emergence transaction to recover $7.5 billion of 2017 wildfire claims costs through securitization that is designed to be rate neutral to customers, with the proceeds used to pay or reimburse the Utility for the payment of wildfire claims costs associated with 2017 Northern California wildfires. Among other uses, as a result of the proposed transaction, the Utility would retire $6.0 billion of Utility debt and accelerate a $592 million payment due to the Fire Victim Trust. Specifically, the application requests administration of the stress test methodology approved in the CHT OIR and a determination that $7.5 billion in 2017 catastrophic wildfire costs and expenses are stress test costs and eligible for securitization. In this context, a securitization refers to a financing transaction where a special purpose financing vehicle issues new debt that is secured by the proceeds of a new recovery charge to Utility customers. The application also proposes a customer credit designed to equal the bond charges over the life of the bonds, which would insulate customers from the charge on customer bills associated with the bonds. The Utility initially proposed to fund the customer credit through a trust that consists of shareholder assets including: (1) an initial contribution of $1.8 billion; (2) up to $7.59 billion of additional contributions funded by certain shareholder tax benefits; and (3) investment returns on the assets in the trust. The Utility also proposed to share with customers 25% of any surplus of shareholder assets in the customer credit trust at the end of the life of the trust.

Protests and response to the application were due June 4, 2020 and the Utility filed a reply on June 12, 2020. A prehearing conference was held on June 18, 2020. The assigned commissioner issued the scoping memo on July 28, 2020 and directed the Utility to file updated testimony, if any, based on its post-emergence financial status by August 7, 2020. On August 7, 2020, the Utility served its updated testimony, in which it discussed, among other things, PG&E Corporation’s and Utility’s exit financings from Chapter 11 and related equity issuances, including to the Fire Victim Trust, in connection with consummating the Plan on July 1, 2020; issuance of revised credit ratings; updated financial forecasts for the Utility and their impacts on the securitization application, including on the stress test costs and the customer credit trust; and certain expected tax impacts.

Intervenor testimony was served on October 14, 2020, and the Utility’s rebuttal testimony was served on November 11, 2020. An evidentiary hearing was held on December 7-16, 2020. Opening briefs were submitted on January 15, 2021, and reply briefs were submitted on February 1, 2021. In a post-hearing briefing, the Utility and other parties in the proceeding included potential conditions and alternatives for the CPUC’s consideration. In post-hearing briefing, the Utility included an alternative proposal for the CPUC’s consideration comprised of four elements: (1) a $200 million increase in the initial shareholder contribution, from $1.8 billion to $2 billion, provided that $1 billion is contributed in 2021 and up to $1 billion in 2024; (2) potential shift in the customer credit trust’s investment portfolio to a greater proportion of fixed income investments; (3) a single CPUC review of the balance of the customer credit trust in 2040, with a single contingent supplemental shareholder contribution, if needed, up to $775 million in 2040; and (4) a reduced sharing of any trust surplus with customers to 10%.

On January 6, 2021, the Utility filed an application requesting that the CPUC issue a financing order authorizing the issuance of one or more series of recovery bonds in connection with the post-emergence transaction to securitize the $7.5 billion of claims associated with the 2017 Northern California Wildfires referenced above. On January 7, 2021, the Utility filed a motion to consolidate the pending application seeking authorization for a post-emergence transaction and the application for a financing order. The ALJ granted the Utility’s motion to shorten the time for protests to January 22, 2021, and the Utility filed a reply on February 1, 2021. A prehearing conference was held on February 5, 2021. On February 10, 2021, certain intervenors filed a joint motion to dismiss the Utility’s application for a financing order. On February 17, 2021, the Utility filed a response opposing the motion to dismiss. Also on February 17, 2021, the PAO filed a response supporting the motion to dismiss. Opening briefs were submitted on March 1, 2021, and reply briefs were submitted on March 12, 2021.

On March 23, 2021, the ALJ issued a PD granting the Utility’s application for a post-emergence transaction to securitize $7.5 billion. On April 5, 2021, the ALJ issued a PD granting the Utility’s application for a financing order authorizing the issuance of recovery bonds in connection with the post-emergence transaction. Oral argument on both applications was held before the CPUC on April 9, 2021. The parties filed opening comments on the PD granting the Utility’s application for a post-emergence transaction to securitize $7.5 billion on April 12, 2021, and reply comments on April 19, 2021. On April 21, 2021, a revised PD was issued. On April 23, 2021, the CPUC issued a decision granting the Utility’s application for a post-emergence transaction to securitize $7.5 billion. The parties filed opening comments on the PD granting the Utility’s application for a financing order on April 26, 2021, and reply comments are due on May 3, 2021. The Utility expects a CPUC decision on the financing order by May 6, 2021.

### Application for AB 1054 Securitization Transaction

On February 24, 2021 the Utility filed an application with the CPUC seeking authorization for a transaction to securitize up to $1.19 billion of fire risk mitigation capital expenditures that have been or will be incurred by the Utility in 2020 and 2021. The $1.19 billion reflects capital expenditures related to the Utility’s Community Wildfire Safety Program that were approved by the CPUC in the 2020 GRC, and includes $655 million in recorded 2020 capital expenditures and an additional $535 million in forecast capital expenditures in 2021. The final amount to be securitized would be based on recorded 2020 and 2021 Community Wildfire Safety Program capital expenditures incurred by the Utility prior to the securitization transaction.

The application requests that the CPUC issue a financing order authorizing one or more series of recovery bonds, determine that the issuance of the bonds and collection through fixed recovery charges is just and reasonable, consistent with the public interest and would reduce rates on a present value basis compared to traditional utility financing mechanisms, and authorize the Utility to collect a NBC sufficient to pay debt service on the recovery bonds. The application also requests to exclude the securitized debt from the Utility’s ratemaking capital structure and to adjust its 2020 GRC revenue requirement following the issuance of the recovery bonds. The application indicates that the issuance of the bonds is anticipated to occur before the end of 2021, but timing is subject to change.

On March 30, 2021, the CPUC held a prehearing conference. The assigned commissioner issued the scoping memo on April 5, 2021. The parties filed opening briefs on April 23, 2021, and reply briefs are due on May 7, 2021. The Utility expects a CPUC decision on the financing order by June 24, 2021.

### 2020-2022 Wildfire Mitigation Plan

As previously disclosed, on February 7, 2020, the Utility submitted its 2020 WMP and utility survey. The Utility’s 2020 WMP describes the Utility’s wildfire safety programs, which are focused on three key areas: reducing the potential for fires to be started by electrical equipment, reducing the potential for fires to spread, and minimizing the frequency, scope and duration of Public Safety Power Shut-off events, as well as providing historical data requested by the guidelines. The Utility’s 2020 WMP covers a three-year period from 2020-2022 but is updated annually.

On June 11, 2020, the CPUC voted to adopt two resolutions which conditionally approved the Utility’s 2020 WMP. The resolutions indicate that while the Utility’s 2020 WMP met the minimum requirements for its submission, the deficiencies found, classified as severity level A, B, or C Conditions, require significant follow-up from the Utility and oversight to ensure appropriate remedies for the deficiencies. The Utility received 41 Conditions in total with the first set, classified as Class A Conditions, submitted on July 27, 2020. The second set, Class B Conditions, were completed on September 9, 2020 and the third, Class C Conditions, were submitted as part of the 2021 WMP update on February 5, 2021. On December 30, 2020, the WSD issued a Notice of Non-Compliance finding that the Utility’s responses to the Class A Conditions were insufficient. The WSD has required the Utility to include 39 action items in its 2021 WMP to address the insufficient responses. On January 8, 2021, the WSD issued a Notice of Non-Compliance finding that the Utility’s quarterly report addressing the Class B Conditions was insufficient. The WSD directed the Utility to respond to 84 action items in its 2021 WMP or via a supplemental filing by February 26, 2021. The Utility’s 2021 WMP was submitted on February 5, 2021. The 2021 WMP updated the 2020 WMP and addressed the Utility’s wildfire safety programs focused on reducing the potential for catastrophic wildfires related to electrical equipment, reducing the potential for fires to spread and reducing the impact of PSPS events. On February 26, 2021, the Utility submitted its supplemental filing addressing the remaining action items regarding the Class A and Class B conditions that WSD determined were insufficient.

Failure to remedy insufficiencies in the 2020-2022 WMP could lead to enforcement actions by the CPUC, including potentially placing the Utility in the EOEP, and making the Utility unable to obtain an AB 1054 safety certification and, as a result, unable to access the Wildfire Fund, which could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows.

On March 4, 2021, the Utility notified the CPUC it had missed inspections for a small percentage of assets in HFTD areas that were subject to the 2020 WMP. On March 12, 2021, the Utility submitted a report updating the CPUC on the Utility’s progress in completing the missing inspections. The Utility is undertaking a review of its electric asset inspections. For more information, see “Electric Asset Inspections” below.

On April 27, 2021, the WSD extended its deadline to issue a determination on the Utility’s 2021 WMP. The Utility expects the WSD to require modification of the WMP through the issuance of revision notices, which the CPUC is expected to send by May 5, 2021. The Utility will then have 30 days to respond to a revision notice. The Utility is unable to predict the timing or outcome of a CPUC decision on the 2021 WMP.

PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows could be materially affected if the Utility is unable to timely recover costs in connection with the 2019 WMP, 2020 WMP, and 2021 WMP recorded in the FRMMA and WMPMA, which the Utility expects will be substantial.

### OIR Regarding Microgrids

As previously disclosed, on September 19, 2019, the CPUC initiated a rulemaking proceeding to examine microgrid implementation issues and resiliency strategies pursuant to SB 1339. In the first track of that proceeding, the CPUC sought to deploy resiliency planning in areas that are prone to outage events and wildfires, with the stated goal of putting some microgrid and other resiliency strategies in place by spring or summer 2020, if not sooner. At the CPUC’s direction, the Utility submitted a proposal for immediate implementation of resiliency strategies on January 21, 2020. The Utility’s proposal contained three components for which it sought scope and cost recovery authorization of up to approximately $379 million in both expense and capital.

The CPUC adopted a decision in the first track of the proceeding on June 11, 2020 (the “Track 1 Decision”), which approved with conditions the Utility’s proposal and requires the Utility to track costs in a new memorandum account for subsequent regulatory review and recovery in rates.

The CPUC initiated the second track of the proceeding on July 3, 2020, which focused on further implementation of SB 1339, as well as activity to shape the transition from diesel mobile generation to alternative, cleaner backup power generation. On January 14, 2021, the CPUC adopted a final decision in the second track of the proceeding (the “Track 2 Decision”). The Track 2 Decision requires the Utility to submit an advice letter to justify the amount of temporary generation necessary for use at substations during the 2021 wildfire season; to identify, if feasible, at least one clean substation project to pilot the use of diesel generation alternatives to power substation-level microgrids; to file an application by June 30, 2021 to propose a longer-term framework for substation generation solutions to mitigate PSPS outage events; and to file an application by September 30, 2021 to recover the costs incurred in 2020 associated with the use of temporary generation to mitigate PSPS outages. The Track 2 Decision also authorizes the Utility to record the future costs of temporary generation for substations in a memorandum account, with recovery of those costs through the GRC or a separate application. The costs for any clean substation project(s) are authorized to be recovered through a one-way balancing account established by the Track 2 Decision, up to a $350 million cap and subject to other eligibility requirements.

On March 5, 2021, the Utility submitted an advice letter seeking authorization to track and record costs for the reservation and operation of up to 168 MW of temporary generation to support substation-level microgrids during 2021 PSPS events. The CPUC approved that advice letter in part on April 14, 2021, specifically approving the request to reserve up to 168 MW of temporary generation in 2021. The CPUC’s disposition letter does not address or resolve the Utility’s plan to establish any clean substation project(s) in 2021, stating that it will address that issue separately.

Failure to obtain a substantial or full recovery of costs could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows.

### Regionalization Proposal

On June 30, 2020, the Utility filed its application for approval of its Regionalization Proposal with the CPUC. The Utility’s proposal would divide its service area into five new regions to further improve safety and reliability, core operations, and be more responsive to the needs of its customers. The Utility’s Regionalization Proposal describes the development of these regions, plans to hire new regional leadership, and a new regional organization structure. The Utility’s application requested the CPUC to approve a memorandum account to record any incremental costs the Utility incurs in connection with the development and implementation of regionalization. The memorandum account proposal was approved in an October 2, 2020 Assigned Commissioner’s Scoping Memo and Ruling. The Utility filed an updated Regionalization Proposal with the CPUC on February 26, 2021. Additional opening and reply comments were filed on April 2, 2021 and April 9, 2021.

The Utility is unable to predict the timing and outcome of this application.

### Wildfire Fund Non-Bypassable Charge

In response to directives in AB 1054, on July 26, 2019, the CPUC opened a new rulemaking to consider the authorization of an NBC to support the Wildfire Fund. On October 24, 2019, the CPUC issued a final decision finding that the imposition of the NBC is just and reasonable. The decision also continues the same allocation of the wildfire charge revenue requirement among the IOUs as previously adopted for the Department of Water Resources power and bond charge revenue requirements. The decision adopts revenue requirements for the Utility of $404.6 million, which is based on average annual collections and will expire at the end of the year 2035.

On December 17, 2020, the CPUC authorized the Utility to collect the Wildfire Fund NBC from eligible customers from January 1, 2021 through December 31, 2021 in the amount of $0.00580 per kilowatt-hour. On December 30, 2020, the Utility submitted an advice letter incorporating final rates effective January 1, 2021.

On March 4, 2021, the CPUC issued a final decision which created a new rulemaking regarding the amount of the Wildfire Non-Bypassable Charge in 2022 and 2023. A prehearing conference for the new rulemaking took place on April 26, 2021. A scoping memo is expected from the CPUC by the end of May 2021.

### OIR to Establish Policies, Processes, and Rules to Ensure Safe and Reliable Gas Systems in California and Perform Long-Term Gas Planning

As previously disclosed, on January 16, 2020, the CPUC opened an OIR to address reliability and standards for gas public utilities, the regulatory changes necessary to improve the coordination between gas utilities and gas-fired electric generators, and impacts due to legislative mandates to address the greenhouse gas reduction emissions which will result in the replacement of gas-fuel technologies and forecast reduced demand for natural gas. This proceeding will examine whether recent industry related events will require the CPUC to change the rules, processes and regulations governing gas utilities, including but not limited to, gas reliability standards, long-term contracting, regulatory accounting, reporting and tariff changes for operational flow orders.

On February 26, 2021, the ALJ issued a ruling seeking comments regarding penalties and financial incentives and potential mechanisms for implementation. Other questions included whether the CPUC should establish new rules to attempt to decrease the risk of electricity price volatility caused by potential gas supply issues and if certain pipeline operating procedures should be uniform across the state. Parties filed comments on the questions on March 19, 2021. In accordance with the amended procedural schedule, on April 2, 2021, parties filed motions regarding the need to serve testimony, file briefs or request evidentiary hearings in Phase 1.

### OIR to Examine Electric Utility De-energization of Power Lines in Dangerous Conditions

On December 13, 2018, the CPUC opened an OIR to examine the notification, mitigation, and reporting requirements on electric utilities when de-energizing power lines in case of dangerous conditions that threaten life or property in California.

On May 30, 2019, the CPUC approved a decision for phase one of this proceeding, which adopted de-energization communication and notification guidelines for the electric IOUs along with updates to requirements established in Resolution ESRB-8.

On May 28, 2020, the CPUC adopted PSPS Phase 2 guidelines, which require utilities to restore energy within 24 hours after the end of a PSPS event where possible; to consult with critical facilities on back-up power for PSPS events; and to support access and functional needs populations during PSPS events, including powering medical equipment at customer resource centers.

On December 2, 2020, the Utility and other parties submitted comments in this proceeding in response to an August 3, 2020 scoping ruling regarding SED’s report in a separate PSPS-related proceeding, OII to Examine the Late 2019 Public Safety Power Shutoff Events. In their comments, the Utility and other parties commented that issues raised in SED’s report should be addressed in a Phase 3 of this OIR rulemaking proceeding.

On November 12, 2019, the assigned commissioner and ALJ issued an order to show cause directing the Utility to show why it should not be sanctioned for the PSPS events of October 9-12, 2019, October 23-25, 2019, and October 26-November 1, 2019.

Opening briefs were filed on October 30, 2020 by all parties, which included an intervenor proposing financial penalties against the Utility of $166 million. If adopted by the CPUC, such penalties could have a material impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. Reply briefs were filed by all parties on November 17, 2020, including the Utility, which opposed the imposition of any penalties.

On February 19, 2021, the CPUC issued a scoping memo proposing updated or additional new guidelines in Phase 3 of this proceeding. If adopted, these guidelines would require utilities to submit annual pre- and post- season reports, have certain percentages of Community Resource Centers be indoors, conduct public outreach in all languages prevalent in its service territory, have a webpage that explains “critical facility” requirements, implement new notification requirements and conduct de-energization simulation exercises. Parties commented in March 2021, and a PD is expected in May 2021, with a final decision in June 2021.

The Utility is unable to predict the outcome of this proceeding.

### OII to Examine the Late 2019 Public Safety Power Shutoff Events

On November 13, 2019, the CPUC issued an OII to determine “whether California’s IOUs prioritized safety and complied with the CPUC’s regulations and requirements with respect to their PSPS events in late 2019.” The first phase of this proceeding focuses on (1) the effectiveness of the utilities’ procedures to notify the public of the PSPS events, (2) the utilities’ communication and coordination with first responders, local jurisdictions and state agencies, and (3) the utilities’ management of its resources to ensure public safety. In later phases of this proceeding, the CPUC may consider taking action if it finds violations of statutes or its decisions or general orders have been committed and to enforce compliance, if necessary.

On August 3, 2020, the assigned commissioner issued a ruling and scoping memo directing parties to file comments regarding: (1) whether the Utility and other large electric IOUs in October and November 2019 complied with the criteria set forth in applicable laws and regulations when pro-actively deenergizing and re-energizing their power lines, and (2) what corrective actions the CPUC should require of the Utility and other large electric IOUs for any failure in late 2019 to comply with the then-existing PSPS guidelines. Each of the large electric IOUs filed their comments on September 2, 2020, intervenors filed their comments on October 16, 2020, and reply comments were filed by all parties on November 16, 2020. Several parties proposed in their comments that penalties be imposed on the utilities for inadequate implementation of the PSPS events. For example, TURN proposed that the CPUC should treat each customer affected by a PSPS event, for which the utility has not adequately demonstrated that the benefits outweigh the public safety risks, as a separate offense, with each offense subject to a penalty of no less than $500 and no more than $100,000. In reply comments, the Utility argued that the proposed penalties should not be adopted for procedural and substantive reasons. If adopted by the CPUC, such penalties could be expected to have a material impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows.

On March 10, 2021, the presiding judge directed the Utility and the other large electric IOUs to provide an accounting of the PSPS events that occurred in their service territories in calendar years 2019 and 2020 and how those PSPS events impacted revenue collections. On April 7, 2021, the Utility and San Diego Gas & Electric submitted their accountings. The Utility estimated the revenue impact from the 2019 PSPS and 2020 PSPS events at approximately $14 million and $5 million, respectively.

On April 20, 2021, the CPUC issued a PD in the case that found each of the large electric IOUs to be noncompliant with CPUC-required guidelines in certain of their 2019 PSPS events. The PD proposes a financial remedy and a number of corrective actions. The financial remedy would consist of forgoing collection of revenues from customers associated with electricity not sold during future PSPS events until it can be demonstrated that the utilities have made improvements in assessing public harm when determining whether to initiate a PSPS event. The corrective actions involve the Utility’s processes, reporting, and other aspects of its PSPS program. The CPUC’s final decision is anticipated no sooner than May 20, 2021.

### Power Charge Indifference Adjustment OIR

As previously disclosed, in 2017, the CPUC initiated the PCIA Rulemaking to make refinements to the PCIA, a cost recovery mechanism to ensure that customers that leave the Utility’s bundled service for a non-Utility provider, such as a DA or CCA provider, pay their fair share of the above-market costs associated with long-term power purchase commitments and Utility-owned generation made on their behalf. The above-market costs of the Utility’s generation portfolio are calculated using benchmarks for energy, RA and renewables portfolio standard attributes.

As previously disclosed, on October 11, 2018, the CPUC approved a phase one decision to modify the PCIA methodology. The Utility implemented a revised PCIA reflecting this decision in rates as of July 1, 2019.

Also, as previously disclosed, on October 10, 2019, the CPUC approved a final decision that finalized the true-up for the new PCIA methodology.

On March 26, 2020, the CPUC approved a final decision on departing load forecasting and PCIA bill presentation issues, establishing that the IOUs shall show a PCIA line item in their tariffs and bill summary tables on all customer bills, which shall be implemented by the last business day of 2021.

On August 6, 2020 the CPUC issued a final decision that would provide a non-Utility provider an option to prepay its entire PCIA obligation.

The proceeding is now examining structures and rules governing how the Utility addresses excess resources in its portfolio due to load loss to CCA and DA, including standards for active management of the Utility’s portfolios. On December 16, 2020, the assigned commissioner issued an amended scoping memo and ruling expanding the rulemaking’s scope to include the potential modification of the annual PCIA rate cap and potential changes to the Utility’s cost recovery and rate setting proceedings to improve PCIA and energy resource recovery account alignment. On April 5, 2021, the CPUC issued a PD that addresses portfolio optimization. The PD removes the PCIA rate cap and trigger mechanism and adopts a limited proposal for portfolio management focused only on the Utility’s renewables portfolio standard eligible resources. Opening comments were filed on April 26, 2021, and reply comments are due on May 3, 2021.

The Utility is unable to predict the outcome of this proceeding.

### Central Procurement of the Resource Adequacy Program

On June 17, 2020, the CPUC issued a decision on the Central Procurement of the RA program. The decision shifts local RA procurement responsibility under the CPUC’s RA program from all LSEs to a CPE in two distribution service areas, including the Utility’s distribution service area, resulting in a change from decentralized to centralized local RA procurement in those distribution service areas. The decision also adopted implementation details for the central procurement of multi-year local RA, ordered the Utility and another IOU to serve as the CPE for their respective distribution service areas, and adopted a hybrid central procurement framework for the multi-year local RA program beginning for the 2023 RA compliance year.

The decision requires the Utility, as the CPE for its distribution service area, to conduct a competitive, all-source solicitation for local RA procurement, with any existing local resource that does not have a contract, any new local resource that can be brought online in time to meet solicitation requirements, or any LSE or third-party with an existing local RA contract eligible to bid into the solicitation.

Subsequently, on December 3, 2020, the CPUC issued a follow-up decision adopting a compensation mechanism applicable to certain local resources that may be procured by the CPE for purposes of reducing the total CPE procurement requirements. This mechanism applies to new preferred local resources and new local energy storage resources, including utility-owned generation. Procurement by the Utility of, and compensation for, such resources will occur outside of the competitive, all-source solicitation.

The cost allocation mechanism methodology is adopted as the cost recovery mechanism to cover procurement costs incurred in serving the central procurement function. The administrative costs incurred in serving the central procurement entity function will also be recoverable under the cost allocation mechanism.

On January 29, 2021, the Utility submitted an advice letter seeking approval by the CPUC’s energy division of a detailed CPE procurement plan. On March 25, 2021, the CPUC’s energy division issued a disposition letter converting the advice letter into an information-only submittal, which does not require approval by the CPUC.

### Integrated Resource Planning Procurement

On November 13, 2019, the CPUC issued a decision that takes a number of steps to address the potential for system RA shortages beginning in 2021. The decision requires incremental procurement of system-level qualifying RA capacity of 3,300 MWs by all LSEs operating within the CAISO’s balancing area for the period 2021-2023, of which the Utility is responsible for 716.9 MWs for its bundled customer portion. The decision requires that at least 50% of LSE resource responsibilities come online by August 1, 2021, at least 75% by August 1, 2022, and the remaining by August 1, 2023. Additionally, the decision directs the IOUs to act as the backstop procurement agent for CCAs and Energy Service Providers (ESPs) that choose not to voluntarily self-procure or that fail to meet their procurement responsibilities after electing to self-provide their assigned MWs of system RA capacity under the decision. On April 15, 2020, the ALJ issued a ruling that the Utility must procure 48.2 MWs of RA capacity for LSEs that chose to opt-out of voluntarily self-providing their required portion.

The Utility has procured its required RA capacity for the August 1, 2021 milestone from third parties through CPUC-approved contracts for lithium ion battery energy storage resources with terms ranging from 10-15 years. On December 22, 2020, the Utility filed an advice letter seeking CPUC approval of an additional group of similar contracts that would satisfy the balance of the Utility’s procurement obligations for the August 1, 2022 and August 1, 2023 milestones. On April 15, 2021, the CPUC approved the contracts.

The CPUC is developing a modified cost allocation mechanism methodology, under which the Utility will be able to recover procurement and administrative costs it incurs in serving the backstop procurement function.

On February 22, 2021, an ALJ issued a ruling seeking comments on a CPUC staff analysis of system reliability need between the years 2024-2026 due to, in part, the pending retirements of Diablo Canyon and once-through-cooling natural gas plants in Southern California. The ALJ ruling includes a CPUC staff recommendation that 7,500 MWs of incremental system reliability resources be ordered to come online by 2026 and be allocated among CPUC-jurisdictional LSEs. A decision is expected by end of the second quarter 2021.

### OIR to Further Develop a Risk-Based Decision-Making Framework for Electric and Gas Utilities

On July 20, 2020, the CPUC initiated a rulemaking proceeding to consider ways to strengthen the risk-based decision-making framework that regulated energy utilities use to assess, manage, mitigate and minimize safety risks. The rulemaking will build on requirements for a utility risk framework adopted in the first Safety Model Assessment Proceeding. The CPUC’s goal is to further the prioritization of safety by electric and gas utilities.

On November 2, 2020, the assigned commissioner issued a scoping memo establishing the scope, schedule, and categorization for Phase I and Phase II of the proceeding. Phase I, which began November 2020, is considering (i) clarifications to the technical requirements of the risk-based decision-making framework; (ii) safety and operational performance metrics; and (iii) refining RAMP procedural requirements.

On November 17, 2020, the assigned commissioner issued a ruling regarding the development of safety and operational metrics for the Utility. The ruling directed the Utility to propose metrics that are “suitable for the use as triggering events as specified in the Enhanced Oversight and Enforcement Process” and “suitable, over time, for the Commission, intervenors, and the public to potentially use to gauge the safety and operational performance of all gas and electric IOUs.” On January 15, 2021, the Utility filed a response proposing 12 safety and operational metrics using the criteria outlined by the ruling. On January 25, 2021, parties filed responses to the Utility’s proposal. On January 28, 2021, the CPUC hosted a public workshop where the Utility, the other IOUs, and intervenors commented on the Utility’s safety and operational metrics proposal. All parties filed comments on the Utility’s safety and operational metrics on March 1, 2021.

On April 22, 2021, the SPD issued a draft staff proposal regarding the Utility’s safety and operational metrics. The proposal recommends 36 safety and operational metrics addressing worker and contractor safety, electric safety risks, reliability, gas safety risks, and customer satisfaction. The SPD will host a workshop on May 4, 2021 to discuss the proposal, and informal comments are due by May 10, 2021. A ruling on the proposal and a PD are expected in May 2021 and August 2021, respectively.

### OIR to Revisit Net Energy Metering Tariffs

On August 17, 2020, the CPUC initiated a rulemaking proceeding to develop a successor to the existing NEM tariffs. The successor tariff is being developed pursuant to the requirements of AB 327. Under AB 327, the successor to the existing NEM tariffs should provide customer-generators with credit or compensation for electricity generated by their renewable facilities based on the value of that generation to all customers and allows customer-sited renewable generation to grow sustainably among different types of customers.

On November 19, 2020, the assigned commissioner and the ALJ issued a scoping memo and ruling for this proceeding. The scoping memo separated the proceeding into two phases. In the first phase, the CPUC will address several issues, including determining the principles to assist in the development and evaluation of a successor to the current NEM tariffs, assessing what information from a study on existing tariffs should inform the successor, outlining the methods to use to analyze the program elements and the resulting proposals, and determining the program elements or specific features that should be included in the successor tariff. In the second phase, the CPUC will consider what additional or enhanced consumer protections for customers should be adopted, as well as other issues that may arise, such as the virtual net energy metering tariffs, NEM aggregation tariff, the Renewable Energy Self-Generation Bill Credit Transfer program, and the NEM fuel cell tariff.

On February 11, 2021, the CPUC issued a final decision that outlined certain guiding principles to assist in the development and evaluation of proposals for successor to the current NEM tariff.

On March 15, 2021, several parties submitted proposals to reform the existing NEM tariff. Parties presented their proposals at workshops on March 23 and 24, 2021, and an additional workshop was held on April 22, 2021. A PD is expected in the fourth quarter of 2021.

### OIR to Address Energy Utility Customer Debt Accumulated during the Coronavirus Pandemic

On February 11, 2021, the CPUC initiated a rulemaking proceeding to consider arrearage relief for utility customers who will have outstanding utility bills when the moratorium on service disconnections ends. The OIR will evaluate a more global program beyond the currently approved arrearage management program focused on low-income residential customers that is funded by the Utility’s customers. The OIR may consider various funding approaches for this expanded debt forgiveness proposal, which could include shareholder funding.

The CPUC has indicated that it expects to issue a PD on May 21, 2021 and a final decision on June 24, 2021.

The Utility is unable to predict the outcome of this proceeding.

### Electric Asset Inspections

On November 17, 2020, the Utility notified the CPUC of missed inspections associated with the Utility’s Pole Test and Treat program. In an audit, the Utility was unable to locate records confirming that approximately 41,000 poles had received intrusive tests in accordance with the 20-year intrusive inspection cycle required by the CPUC General Order 165. The Utility is reviewing its records to reconcile available data to determine the status of inspections on these poles. Where records are inconclusive or where the Utility confirms that inspections have not taken place, the Utility is performing inspections on the poles. The Utility is also taking measures to prevent recurrence of this issue in the future. The Utility is providing bi-weekly updates to the CPUC on the status of the review. The Utility also identified a need to correct representations made in prior General Order 165 annual reports once the data review is complete.

On March 4, 2021, the Utility notified the CPUC of errors that the Utility identified in connection with electric asset inspections under its 2020 WMP. The Utility determined that it did not perform enhanced inspections of approximately 24 hydroelectric substations in HFTD Tier 3 areas under the 2020 WMP, or approximately 43% of substations in this tier. The Utility completed remedial inspections on an expedited basis to inspect the hydroelectric substations in HFTD Tier 3 and approximately one-third of the hydroelectric substations in HFTD Tier 2 by March 31, 2021. HFTD areas are those designated by the CPUC where there is an elevated risk for power line fires igniting and spreading rapidly and where stricter fire-safety regulations apply. In addition, the Utility is taking corrective measures to prevent similar errors going forward. Under the EOEP, the Utility “fail\[ing\] to comply with, or \[showing\] insufficient progress toward, any of the metrics (i) set forth in its approved wildfire mitigation plan” constitutes a step one triggering event. The Utility could face penalties, enforcement action, or other adverse legal or regulatory consequences for the errors reported in the notification. The Utility is unable to predict the likelihood and amount of any fines or penalties related to this matter.

The Utility is currently in the process of identifying missed electric asset inspections, beyond those identified in the Pole Test and Treat audit or the hydroelectric substations remedial inspections. The Utility intends to update the CPUC upon completion of its reviews. The Utility could face penalties, enforcement action, or other adverse legal or regulatory consequences for the late inspections. The Utility is unable to predict the likelihood and the amount of potential fines or penalties related to these matters.

### LEGISLATIVE AND REGULATORY INITIATIVES

### Assembly Bill 1054

On July 12, 2019, the California governor signed into law AB 1054, a bill which provides for the establishment of a statewide fund that will be available for eligible electric utility companies to pay eligible claims for liabilities arising from wildfires occurring after July 12, 2019 that are caused by the applicable electric utility company’s equipment, subject to the terms and conditions of AB 1054. Eligible claims are claims for third party damages resulting from any such wildfires, limited to the portion of such claims that exceeds the greater of (i) $1.0 billion in the aggregate in any year and (ii) the amount of insurance coverage required to be in place for the electric utility company pursuant to section 3293 of the Public Utilities Code, added by AB 1054.

AB 1054 also provides that the first $5.0 billion expended in the aggregate by California’s three large electric IOUs on fire risk mitigation capital expenditures included in their respective approved WMPs will be excluded from their respective equity rate bases. The $5.0 billion of capital expenditures will be allocated among the large electric IOUs in accordance with their Wildfire Fund allocation metrics. (See Note 3 of the Notes to the Condensed Consolidated Financial Statements in Item 1.) AB 1054 contemplates that such capital expenditures may be securitized through a customer charge. On February 24, 2021, the Utility filed an application with the CPUC seeking authorization for a transaction to securitize up to a principal amount of approximately $1.19 billion related to fire risk mitigation capital expenditures that have been or will be incurred by the Utility in 2020 and 2021.

Each of California’s large electric IOUs have elected to participate in the Wildfire Fund. On July 1, 2020, having satisfied the conditions for the Utility’s participation in the Wildfire Fund, the Utility deposited approximately $5 billion in the Wildfire Fund, which represents PG&E’s initial and first annual contributions. On December 30, 2020, the Utility made its second annual contribution of $193 million to the Wildfire Fund.

### ENVIRONMENTAL MATTERS

The Utility’s operations are subject to extensive federal, state, and local laws and permits relating to the protection of the environment and the safety and health of the Utility’s personnel and the public. These laws and requirements relate to a broad range of the Utility’s activities, including the remediation of hazardous wastes; the reporting and reduction of carbon dioxide and other greenhouse gas emissions; the discharge of pollutants into the air, water, and soil; the reporting of safety and reliability measures for natural gas storage facilities; and the transportation, handling, storage, and disposal of spent nuclear fuel. (See Note 11 of the Notes to the Condensed Consolidated Financial Statements in Item 1 of this Form 10-Q, as well as “Item 1A. Risk Factors” and Note 15 of the Notes to the Consolidated Financial Statements in Item 8 of the 2020 Form 10-K.)

### CONTRACTUAL COMMITMENTS

PG&E Corporation and the Utility enter into contractual commitments in connection with future obligations that relate to purchases of electricity and natural gas for customers, purchases of transportation capacity, purchases of renewable energy, and purchases of fuel and transportation to support the Utility’s generation activities. (See “Purchase Commitments” in Note 11 of the Notes to the Condensed Consolidated Financial Statements in Item 1). Contractual commitments that relate to financing arrangements include long-term debt, preferred stock, and certain forms of regulatory financing. For more in-depth discussion about PG&E Corporation’s and the Utility’s contractual commitments, see “Liquidity and Financial Resources” above and MD&A “Contractual Commitments” in Item 7 of the 2020 Form 10-K.

### Off-Balance Sheet Arrangements

PG&E Corporation and the Utility do not have any off-balance sheet arrangements that have had, or are reasonably likely to have, a current or future material effect on their financial condition, changes in financial condition, revenues or expenses, results of operations, liquidity, capital expenditures, or capital resources, other than those discussed in Note 15 of the Notes to the Consolidated Financial Statements in Item 8 of the 2020 Form 10-K (the Utility’s commodity purchase agreements).

### RISK MANAGEMENT ACTIVITIES

PG&E Corporation, mainly through its ownership of the Utility, and the Utility are exposed to risks associated with adverse changes in commodity prices, interest rates, and counterparty credit.

The Utility actively manages market risk through risk management programs designed to support business objectives, discourage unauthorized risk-taking, reduce commodity cost volatility, and manage cash flows. The Utility uses derivative instruments only for risk mitigation purposes and not for speculative purposes. The Utility’s risk management activities include the use of physical and financial instruments such as forward contracts, futures, swaps, options, and other instruments and agreements, most of which are accounted for as derivative instruments. Some contracts are accounted for as leases. The Utility manages credit risk associated with its counterparties by assigning credit limits based on evaluations of their financial conditions, net worth, credit ratings, and other credit criteria as deemed appropriate. Credit limits and credit quality are monitored periodically. These activities are discussed in detail in the 2020 Form 10-K. There were no significant developments to the Utility’s and PG&E Corporation’s risk management activities during the three months ended March 31, 2021.

### CRITICAL ACCOUNTING POLICIES

The preparation of the Condensed Consolidated Financial Statements in accordance with GAAP involves the use of estimates and assumptions that affect the recorded amounts of assets and liabilities as of the date of the Condensed Consolidated Financial Statements and the reported amounts of revenues and expenses during the reporting period. PG&E Corporation and the Utility consider their accounting policies for regulatory assets and liabilities, loss contingencies associated with environmental remediation liabilities and legal and regulatory matters, AROs, contributions to the Wildfire Fund, and pension and other post-retirement benefit plans to be critical accounting policies. These policies are considered critical accounting policies due, in part, to their complexity and because their application is relevant and material to the financial position and results of operations of PG&E Corporation and the Utility, and because these policies require the use of material judgments and estimates. Actual results may differ materially from these estimates and assumptions. These accounting policies and their key characteristics are discussed in detail in the 2020 Form 10-K.

### ACCOUNTING STANDARDS ISSUED BUT NOT YET ADOPTED

See the discussion above in Note 3 of the Notes to the Condensed Consolidated Financial Statements in Item 1.

## Market risk

As filed, 612 characters.

PG&E Corporation’s and the Utility’s primary market risk results from changes in energy commodity prices. PG&E Corporation and the Utility engage in price risk management activities for non-trading purposes only. Both PG&E Corporation and the Utility may engage in these price risk management activities using forward contracts, futures, options, and swaps to hedge the impact of market fluctuations on energy commodity prices and interest rates. (See the section above entitled “Risk Management Activities” in MD&A and in Notes 8 and 9 of the Notes to the Condensed Consolidated Financial Statements in Item 1.)

## Controls and procedures

As filed, 1,168 characters.

Based on an evaluation of PG&E Corporation’s and the Utility’s disclosure controls and procedures as of March 31, 2021, PG&E Corporation’s and the Utility’s respective principal executive officers and principal financial officers have concluded that such controls and procedures are effective to ensure that information required to be disclosed by PG&E Corporation and the Utility in reports that the companies file or submit under the Exchange Act, is (i) recorded, processed, summarized, and reported within the time periods specified in the SEC rules and forms, and (ii) accumulated and communicated to PG&E Corporation’s and the Utility’s management, including PG&E Corporation’s and the Utility’s respective principal executive officers and principal financial officers, or persons performing similar functions, as appropriate to allow timely decisions regarding required disclosure.

There were no changes in internal control over financial reporting that occurred during the quarter ended March 31, 2021, that have materially affected, or are reasonably likely to materially affect, PG&E Corporation’s or the Utility’s internal control over financial reporting.

## Risk factors

As filed, 9,647 characters.

For information about the significant risks that could affect PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows, see the section of the 2020 Form 10-K entitled “Risk Factors,” as supplemented below, and the section of this quarterly report entitled “Forward-Looking Statements.”

***If PG&E Corporation elects to treat the Fire Victim Trust as a “grantor trust,” the application of the Ownership Restrictions, as defined in PG&E Corporation’s Amended Articles of Incorporation, will be determined on the basis of a number of shares outstanding that could differ materially from the number of shares reported as outstanding on the cover page of its periodic reports under the Exchange Act.***

The Plan contemplates that the Fire Victim Trust will be treated as a “qualified settlement fund” for U.S. federal and state income tax purposes, subject to PG&E Corporation’s ability to elect to treat the Fire Victim Trust as a “grantor trust” for U.S. federal and state income tax purposes instead. In January 2021, PG&E Corporation received an IRS ruling that states the Utility is eligible to make a grantor trust election for U.S. federal income tax purposes, with respect to the Fire Victim Trust and addressed certain, but not all, related issues. PG&E Corporation believes benefits associated with “grantor trust” treatment, including, a potentially larger tax deduction related to the proceeds realized by the Fire Victim Trust from the sale of shares contributed to the Fire Victim Trust, could be realized, but only if PG&E Corporation and the Fire Victim Trust can meet certain requirements of the Internal Revenue Code and Treasury Regulations thereunder, relating to sales of PG&E Corporation stock. PG&E Corporation expects to elect grantor trust treatment if it is able to enter into a definitive agreement with the Fire Victim Trust. On April 28, 2021, the Bankruptcy Court issued an oral ruling that it would approve the material terms of an agreement between PG&E Corporation, the Utility and the Fire Victim Trust that supports the election of the grantor trust treatment. There can be no assurance that the parties will execute a definitive agreement or that PG&E Corporation will be able to avail itself of the benefits of a grantor trust election.

If PG&E Corporation were to elect to treat the Fire Victim Trust as a “grantor trust,” any shares owned by the Fire Victim Trust would effectively be excluded from the total number of outstanding equity securities when calculating a person’s Percentage Ownership (as defined in the Amended Articles) for purposes of the Ownership Restrictions. For example, whereas the number of outstanding shares of PG&E Corporation common stock for corporate purposes as of April 26, 2021 was 1,985,105,703 shares, for purposes of the Ownership Restrictions, the number of outstanding shares of PG&E Corporation common stock would be 1,507,362,113 shares (the number of outstanding shares of common stock less the number of shares owned by the Fire Victim Trust as of April 26, 2021). As such, based on the total number of outstanding equity securities and assuming the Fire Victim Trust has not sold any shares of PG&E Corporation common stock, a person’s effective percentage ownership restriction for purposes of the Amended Articles would be 3.6%. PG&E Corporation does not control the number of shares held by the Fire Victim Trust and is not able to determine in advance the number of shares the Fire Victim Trust will hold. PG&E Corporation intends to periodically make available to investors information about the number of shares of common stock held by the Fire Victim Trust as of a specified date for purposes of the Ownership Restrictions, including in its Quarterly Reports and Annual Reports filed with the SEC.

PG&E Corporation expects to publicly announce its determination on whether it will elect to treat the Fire Victim Trust as a “grantor trust” promptly after entering into definitive documentation with the Fire Victim Trust with respect to meeting certain requirements of the Internal Revenue Code and Treasury Regulations necessary to realize the benefits associated with “grantor trust” treatment. In the event PG&E Corporation makes a “grantor trust” election with respect to the Fire Victim Trust, PG&E Corporation intends to enforce the Ownership Restrictions as described in the foregoing paragraph (excluding any shares owned by the Fire Victim Trust from the number of outstanding equity securities), including with respect to Transfers (as defined in the Amended Articles) occurring before such announcement. However, it is anticipated that the Board of Directors of PG&E Corporation will exempt Transfers to shareholders that occurred prior to July 30, 2020 (the date PG&E Corporation initially announced it was considering treating the Fire Victim Trust as a grantor trust in its Form 10-Q for the quarterly period ended June 30, 2020), solely to the extent that such Transfers would have complied with the Ownership Restrictions if the Ownership Restrictions were applied on the basis that the shares owned by the Fire Victim Trust were treated as outstanding equity securities. For the avoidance of doubt, all other Transfers of equity securities (including acquisitions from and after the July 30, 2020 by shareholders benefiting from an exemption described in the preceding sentence) will continue to be subject to the ownership restrictions. All current and prospective shareholders are advised to consider the foregoing in determining their ownership and acquisition of PG&E Corporation common stock.

***PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected as a result of the 2019 Kincade fire, the 2020 Zogg fire or future wildfires.***

PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected as a result of the 2019 Kincade fire, the 2020 Zogg fire or future wildfires.

Based on the facts and circumstances available as of the date of this report, PG&E Corporation and the Utility have determined that it is probable they will incur a loss in connection with the 2019 Kincade fire and the 2020 Zogg fire. Although PG&E Corporation and the Utility have recorded liabilities for probable losses in connection with such wildfires, these liability estimates correspond to the lower end of the range of reasonably estimable losses, do not include several categories of potential damages that are not reasonably estimable, and are subject to change based on new information.

Although there are a number of unknown facts surrounding Cal Fire’s causation determinations of the 2019 Kincade fire and the 2020 Zogg fire, the Utility could be subject to significant liability in excess of insurance coverage or amounts available under the Wildfire Fund under AB 1054 that would be expected to have a material impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. PG&E Corporation and the Utility have also received and have responded or are responding to data requests from the CPUC’s SED relating to the 2019 Kincade fire and the 2020 Zogg fire. Furthermore, the Sonoma County District Attorney’s Office has filed criminal charges against the Utility in connection with the 2019 Kincade fire and the Shasta County District Attorney’s Office is conducting an investigation into the 2020 Zogg fire. If the Utility were to be convicted of the charges in the criminal complaint, the Utility could be subject to fines, penalties, and restitution to victims for their economic losses, as well as non-monetary remedies such as oversight requirements. The Utility does not expect that any of its liability insurance would be available to cover restitution payments ordered by the court presiding over the criminal proceeding. PG&E Corporation and the Utility could be the subject of additional investigations, lawsuits, or enforcement actions in connection with the 2019 Kincade fire, the 2020 Zogg fire or future wildfires.

Although the Utility has taken extensive measures to reduce the threat of future wildfires, the potential that the Utility’s equipment will be involved in the ignition of future wildfires, including catastrophic wildfires, is significant. This risk may be attributable to, and exacerbated by, a variety of factors, including climate (in particular extended periods of seasonal dryness coupled with periods of high wind velocities and other storms), infrastructure, and vegetation conditions. Despite significant investment in mitigation measures to improve infrastructure and manage vegetation, as well as implementation of de-energization strategies, the Utility may not be successful in mitigating the risk of future wildfires.

In addition, the 2019 Kincade fire and the 2020 Zogg fire have had and, along with any future wildfires could continue to have adverse consequences on the Utility’s probation proceeding, the Utility’s proceedings with the CPUC and the FERC (including the Safety Culture OII), and future regulatory proceedings, including future applications for the safety certification required by AB 1054. PG&E Corporation and the Utility may also suffer additional reputational harm and face an even more challenging operating, political, and regulatory environment as a result of the 2019 Kincade fire, 2020 Zogg fire or any future wildfires. For more information about the 2019 Kincade fire and the 2020 Zogg fire, see Note 10 in Item 1.

Filed Apr 29, 2021.