# PG&E Corp: Form 10-K for the period ended Dec 31, 2021

- Company: [PG&E Corp](/companies/pcg.md) (CIK 1004980)
- Form: 10-K
- Filed: 2022-02-10
- Accepted by EDGAR: Feb 10, 2022, 08:07 ET
- Period: 2021-12-31
- Accession: 0001004980-22-000009
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/1004980/000100498022000009/pcg-20211231.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/1004980/000100498022000009/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2021-12-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 12 months, 2021-01-01 to 2021-12-31 | $20.64bn | us-gaap:Revenues |
| Operating income | 12 months, 2021-01-01 to 2021-12-31 | $1.88bn | us-gaap:OperatingIncomeLoss |
| Interest expense | 12 months, 2021-01-01 to 2021-12-31 | $1.60bn | us-gaap:InterestExpense |
| Income tax | 12 months, 2021-01-01 to 2021-12-31 | $836.0m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 12 months, 2021-01-01 to 2021-12-31 | −$88.0m | us-gaap:ProfitLoss |
| Diluted EPS | 12 months, 2021-01-01 to 2021-12-31 | −$0.05 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 12 months, 2021-01-01 to 2021-12-31 | −$0.05 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 12 months, 2021-01-01 to 2021-12-31 | 1,985,000,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 12 months, 2021-01-01 to 2021-12-31 | $2.26bn | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 12 months, 2021-01-01 to 2021-12-31 | $7.69bn | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Cash and equivalents | at 2021-12-31 | $291.0m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2021-12-31 | $11.08bn | us-gaap:AssetsCurrent |
| Total assets | at 2021-12-31 | $103.33bn | us-gaap:Assets |
| Current liabilities | at 2021-12-31 | $17.43bn | us-gaap:LiabilitiesCurrent |
| Long-term debt | at 2021-12-31 | $38.23bn | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2021-12-31 | $4.48bn | us-gaap:LongTermDebtCurrent |
| Short-term borrowings | at 2021-12-31 | $2.18bn | us-gaap:ShortTermBorrowings |
| Shareholders' equity | at 2021-12-31 | $20.97bn | us-gaap:StockholdersEquity |

## Business

As filed, 114,749 characters.

PG&E Corporation, incorporated in California in 1995, is a holding company whose primary operating subsidiary is Pacific Gas and Electric Company, a public utility operating in Northern and Central California. The Utility was incorporated in California in 1905. PG&E Corporation became the holding company of the Utility and its subsidiaries in 1997. The Utility generates revenues mainly through the sale and delivery of electricity and natural gas to customers. The Utility’s service area is shown in the graphic below.

PG&E Corporation’s and the Utility’s operating revenues, income, and total assets can be found below in Item 8. Financial Statements and Supplementary Data.

The principal executive offices of PG&E Corporation and the Utility are located at 77 Beale Street, P.O. Box 770000, San Francisco, California 94177. PG&E Corporation’s telephone number is (415) 973-1000 and the Utility’s telephone number is (415) 973-7000.

This is a combined Annual Report on Form 10-K for PG&E Corporation and the Utility. Each of PG&E Corporation and the Utility is a separate entity, with distinct creditors and claimants, and is subject to separate laws, rules, and regulations.

Over the past several years, Northern California has experienced major wildfires. For more information about material wildfires, see Item 7. MD&A, and Note 14 of the Notes to the Consolidated Financial Statements in Item 8.

This 2021 Form 10-K contains forward-looking statements that are necessarily subject to various risks and uncertainties. For a discussion of the significant risks that could affect the outcome of these forward-looking statements and PG&E Corporation’s and the Utility’s future financial condition, results of operations, liquidity, and cash flows, see Item 1A. Risk Factors and “Forward-Looking Statements” above.

### Triple Bottom Line

PG&E Corporation’s and the Utility’s purpose is to deliver for their hometowns, serve the planet, and lead with love. In support of this purpose, the companies employ a Lean operating model designed to drive more effective and responsive decision-making, reduce the human struggle many coworkers face in their day-to-day work, and deliver better outcomes for customers and communities.

PG&E Corporation and the Utility measure their progress toward the purpose by considering their impact on the “triple bottom line” of people, planet, and prosperity, which is underpinned by performance; this consideration takes into account not only the economic value they create for customers and investors, but also their responsibility to social and environmental goals. The triple bottom line is designed to balance the interests of the companies’ many stakeholders, and it reflects the broader societal impacts of the companies’ activities.

PG&E Corporation and the Utility will continue to consider the impact on the triple bottom line of people, planet, and prosperity in their daily operations as well as in their long-term strategic decisions. The Utility will continue to seek fair and timely regulatory treatment in order to support its customer-driven investment plan while pursuing cost-control measures that would allow it to maintain the affordability of its service. The Lean operating system is an important means of realizing PG&E Corporation’s and the Utility’s objective of achieving world class performance while delivering hometown service.

### People

The people element of the triple bottom line represents PG&E Corporation’s and the Utility’s commitment to their workforce, their customers, the residents of local communities in which the companies do business, and other stakeholders.

PG&E Corporation’s and the Utility’s goal is to continually reduce risk to keep customers, the communities they serve, and their workforce (both employees and contractors) safe. Their focus is on continuously building an organization where every work activity is designed to facilitate safe performance, every worker knows and practices safe behaviors, and every individual is encouraged to speak up and stop work if they see unsafe or risky behavior, and has confidence that their concerns and ideas will be heard and pursued. PG&E Corporation and the Utility are committed to significantly improving their safety performance by understanding their risks, prioritizing their work, using controls to reduce risks, and continuously measuring and improving risk reduction.

PG&E Corporation’s and the Utility’s human capital resource objectives are to build and retain an engaged, well trained, diverse, and equitable workforce. PG&E Corporation and the Utility place a high priority on delivering customer value and providing a hometown customer experience. The Utility’s customer-driven investment program is aimed at improving safety, increasing electric and gas reliability, and improving customer satisfaction.

For more information, see “Human Capital” below.

### Planet

The planet element of the triple bottom line represents PG&E Corporation’s and the Utility’s commitment to protect and serve the environment. This commitment extends beyond compliance with various state and federal environmental, health, and safety laws and regulations. Management believes that integrating and managing climate change and other environmental considerations in the companies’ business strategies creates long-term value for PG&E Corporation and the Utility, and for their customers, communities, coworkers, and other stakeholders. Mitigating and adapting to the impacts of climate change presents opportunities for growth for the Utility’s business and economic opportunity for the communities it serves.

The Utility strives to be prepared to continue to deliver safe, clean, affordable, and reliable energy in the face of increasingly severe and extreme climate-driven natural hazards. To build resilience to these hazards, the Utility is working to systematically integrate the consideration of forward-looking climate data and tools in its decision-making. PG&E Corporation and the Utility also work with policymakers and regulators to advance effective climate adaptation policy in California, and work directly with local governments and communities on adaptation solutions.

PG&E Corporation and the Utility are an important enabler of California’s effort to reduce GHG emissions. California has set a goal to achieve economy-wide carbon neutrality no later than 2045. SB 100 increased California’s RPS target to 60% by the end of 2030 and requires 100% of retail sales to come from eligible renewables or zero-carbon resources by the end of 2045.

The impacts of climate change on the Utility’s infrastructure are already a reality. Record-breaking extreme heat and heat waves are increasingly a regular occurrence throughout California. Peak loads are expected to increase with increasing temperatures due to direct impacts of ambient temperatures on equipment and direct impacts on electricity demand driven by rising air conditioning installation and usage. The Utility’s assets on the coast and in or near watersheds face potential increased exposures to coastal, riverine, and precipitation-related flooding because of climate-driven changes in precipitation and sea-level rise.

Climate change will also continue to intensify the potential for wildfires throughout California. The worsening conditions across California increase the likelihood and severity of wildfires, including those where the Utility’s equipment may be alleged to be associated with the fire’s ignition. Reducing risk will be even more important as climate change continues to exacerbate the risks facing the Utility. A key element of preparing the Utility for the physical risks of climate change is a system-wide CVA of the Utility’s assets, operations, and services, which the Utility expects to file with the CPUC in 2024. The CVA is expected to improve the Utility’s understanding of its exposure to climate hazards and the sensitivity of assets and operations to these hazards.

The electric power industry is undergoing transformative change driven by technological advancements enabling customer choice (for example, customer-owned generation and energy storage) and state climate policy supporting a decarbonized economy. California utilities also are experiencing increasing deployment by customers and third parties of distributed energy resources, such as on-site solar generation, energy storage, fuel cells, energy efficiency, and load management technologies. These developments will require sustained investments in grid modernization, renewable integration projects, energy efficiency programs, energy storage options, and EV infrastructure. To this end, the CPUC is conducting proceedings to evaluate changes to the planning and operation of the electric distribution grid in order to prepare for higher penetration of distributed energy resources and consider future grid modernization and grid reinforcement investments; evaluate if traditional grid investments can be deferred by distributed energy resources, and if feasible, what, if any, compensation to utilities would be appropriate for enabling those investments; and clarify the role of the electric distribution grid operator.

PG&E Corporation and the Utility continue to pursue policies and programs that enable safe, reliable, and affordable clean and resilient energy for their customers. As a result of actions already taken by PG&E Corporation and the Utility, the companies have:

- Exceeded California’s renewable portfolio standards goal for each utility (including the Utility) to deliver 33 percent of eligible renewable energy by the end of 2020, and delivered clean electricity to customers in 2021 that was more than 90% GHG free.
- Helped customers avoid emissions through energy efficiency programs, supporting California’s goal to double energy efficiency in existing buildings by 2030.
- Awarded contracts for more than 1.7 GWs of battery energy storage, strengthening California’s grid efficiency and reliability.
- Installed approximately 5,000 charging ports for EVs at workplaces and multi-family dwellings, including installing 39% of these charging ports in disadvantaged communities, and also offered programs to support medium- and heavy-duty fleets and public fast charging in support of California’s goal of 100 percent sales of light-duty zero-emission vehicles by 2035.
- Brought the total number of interconnected private solar customers to more than 600,000 and supported more than 33,000 customers who have installed battery storage at their homes or businesses.
- Pursued decarbonization initiatives for the Utility’s natural gas delivery system, including working to interconnect several renewable natural gas projects.

Looking ahead, the Utility expects its GHG-free energy supply mix of renewable, large hydroelectric, and nuclear generation resources to remain elevated while Diablo Canyon continues to operate. Once Diablo Canyon ceases operations in 2025, the Utility expects its percentage of GHG-free electricity to decrease substantially. The CPUC coordinates the planning of supply resources through the Integrated Resource Planning (“IRP”) proceeding and has determined that replacing the power generated by Diablo Canyon is the responsibility of all LSEs within the CAISO. Towards the end of the decade and beyond, the Utility’s GHG-free energy supply mix is expected to grow relative to 2025 levels as the Utility works to meet California’s IRP GHG emissions reduction targets and its RPS target. For more information, see “Integrated Resource Planning Procurement” below.

### Prosperity

The prosperity element of the triple bottom line represents PG&E Corporation’s and the Utility’s commitment to meeting their financial objectives and providing economic development opportunities and benefits in the communities they serve. Management believes clean energy should be affordable for and inclusive of all economic backgrounds.

The Utility operates under a “cost of service ratemaking model,” which means that rates for electric and natural gas utility services are generally set at levels that are intended to allow the Utility to recover its costs of providing service and have the opportunity to earn a return on invested capital. Under cost of service ratemaking, a utility’s earnings depend on the outcomes of its ratemaking proceedings and its ability to manage costs.

In order to set rates, the CPUC and the FERC conduct proceedings to determine the amount that the Utility will be authorized to collect from its customers (“revenue requirements”). Revenue authorized by the CPUC through GRC proceedings is intended to provide the Utility a reasonable opportunity to recover its costs and earn a return on its investments in generation and distribution assets and general plant (also referred to as “rate base”) on a forecast basis. The Utility’s revenue requirements consist primarily of a base amount set to enable the Utility to recover its reasonable operating expenses (e.g., maintenance, administration and general expenses) and capital costs (e.g., depreciation, taxes, and financing expenses). In addition, the CPUC authorizes the Utility to collect revenues to recover costs that the Utility is allowed to “pass-through” to customers (referred to as “Utility Revenues and Costs that did not Impact Earnings” in Item 7. MD&A), including its costs to procure electricity and natural gas for customers and to administer public purpose and customer programs.

The Utility’s rate of return on electric transmission assets is determined in the FERC TO proceedings. The rate of return on all other Utility assets is set in the CPUC’s cost of capital proceeding. Other than certain gas transmission and storage revenues, the Utility’s base revenues are “decoupled” from its sales volume through certain regulatory balancing accounts, or revenue adjustment mechanisms, that are designed to allow the Utility to collect its authorized base revenue requirements regardless of sales volume. As a result, the Utility’s base revenues are not impacted by fluctuations in sales resulting from, for example, weather or economic conditions. The Utility’s earnings primarily depend on its ability to manage its base operating and capital costs (referred to as “Utility Revenues and Costs that Impacted Earnings” in Item 7. MD&A) within its authorized base revenue requirements.

See “Ratemaking Mechanisms” below and “Regulatory Matters” in Item 7. MD&A for more information on specific CPUC and FERC proceedings.

Generally, differences between forecast costs and actual costs (referred to as “Utility Revenues and Costs that Impacted Earnings” in Results of Operations in Item 7. MD&A) can occur for numerous reasons, including the volume of work required and the impact of market forces on the cost of labor and materials. Differences in costs can also arise from changes in laws and regulations at both the state and federal level. The Utility has initiated a program to reduce its spending on operations and maintenance.

PG&E Corporation and the Utility are committed to taking steps to improve their credit ratings and metrics over time, including by reducing their debt. PG&E Corporation and the Utility have set goals to reduce their debt over time, including reducing PG&E Corporation’s debt by $2 billion by the end of 2023. PG&E Corporation and the Utility expect that reducing the consolidated debt will help them achieve investment grade credit ratings for their unsecured securities, for the benefit of both customers and investors. For more information, see Note 5 of the Notes to the Consolidated Financial Statements in Item 8. Additionally, the Utility filed an application with the CPUC seeking authorization for a post-emergence transaction to recover $7.5 billion of 2017 wildfire claims costs. Among other uses, as a result of the proposed transaction, the Utility would retire $6.0 billion of Utility debt. For more information, see “Application for Post-Emergence Securitization Transaction” in Item 7. MD&A.

On December 20, 2017, the Boards of Directors of PG&E Corporation and the Utility suspended quarterly cash dividends on both PG&E Corporation’s and the Utility’s common stock, as well as the Utility’s preferred stock. PG&E Corporation’s and the Utility’s ability to issue dividends is subject to restrictions. On February 8, 2022, the Board of Directors of the Utility authorized the payment of all cumulative and unpaid dividends on the Utility’s preferred stock. For more information, see “Dividends” in Item 7. MD&A.

Total capital expenditures (including accruals) recorded in 2021 were $8.6 billion. The Utility’s total capital expenditures (including accruals) are forecasted to be between $7.8 billion and $8.9 billion for 2022, between $7.9 billion and $10.4 billion for 2023, between $7.9 billion and $10.7 billion for 2024, between $8.0 billion and $11.3 billion for 2025, and between $8.1 billion and $12.0 billion for 2026. The completion of projects, the timing of expenditures, and the associated cost recovery may be affected by permitting requirements and delays, construction schedules, availability of labor, equipment and materials, financing, legal and regulatory approvals and developments, community requests or protests, weather and other unforeseen conditions.

The Utility expects to make additional CPUC capital expenditures, the recovery of which will be subject to future regulatory approval, including the 2023 GRC. These expenditures include capital expenditures exceeding amounts authorized in the 2020 GRC, and expenditures to be included in a later stage of the 2023 GRC. The 2023 through 2026 currently above authorized capital spending levels are primarily for additional wildfire mitigation, transportation electrification and the Lakeside Building. Additionally, $3.21 billion of fire risk mitigation capital expenditures will be excluded from the Utility’s equity rate base pursuant to AB 1054.

PG&E Corporation and the Utility are committed to keeping gas and electric services affordable for all customers. The Utility’s capital investment plan, increasing procurement of renewable power and energy storage, increasing environmental regulations, and the cumulative impact of other public policy requirements collectively place continuing upward pressure on customer rates. Certain CPUC proceedings, such as the OIR to Revisit Net Energy Metering Tariffs, could impact different types of customers differently. Similarly, although the Utility generally recovers its electricity and natural gas procurement costs through rates as “pass-through” costs, commodity prices rose substantially in 2021, relative to 2020. The Utility is addressing this customer rate pressure with cost reductions through increased efficiency, including efficiency driven by implementing the Lean operating system, improving its work management, identifying additional opportunities to convert expenses to capital expenditures, and an improved organizational design. The Utility has a number of programs in place to assist low-income customers, such as the CARE program. Under the CARE program, income-qualified customers can receive a monthly discount of 20% or more on their gas and electric bill.

PG&E Corporation’s and the Utility’s Corporate Sustainability Report, which is available to the public, describes the companies’ progress toward world-class performance measured with the triple bottom line framework.

In 2020, the Utility spent $3.9 billion with certified diverse suppliers, representing 38.9% of its total spend.

### Performance: Underpinning The Triple Bottom Line

PG&E Corporation and the Utility are transitioning to the Lean operating system, which includes four basic “plays”: visual management, operating reviews, problem solving and standard work. PG&E Corporation and the Utility have implemented the first two plays in 2021 and expect to roll out the second two plays in 2022. Visual management allows teams to see how they are performing against their most important metrics using real-time data. During 2021, PG&E Corporation and the Utility have set up over 2,000 daily operating reviews, beginning with crews closest to the work and cascading up to senior leadership. These brief meetings help the Utility identify gaps and quickly develop plans to support the teams performing the work and give the Utility more visibility, control and predictability in its operations. For instance, the Lean operating system helped the Utility identify patterns in the conditions of ignitions and led to the implementation of EPSS. PG&E Corporation’s and the Utility’s performance is also driven by an increased focus on alignment on shared outcomes among its leadership and within the organization.

PG&E Corporation and the Utility have implemented a regional operating model to place more co-workers and operational leadership closer to their customers. The purposes of regionalization are to address local issues faster; reduce outage response times; create faster interconnections for customers connecting solar or distributed energy to the grid; and build stronger relationships and information flow between the companies and their customers.

California has experienced unprecedented weather conditions in recent years and the Utility’s service territory remains susceptible to additional wildfire activity. In response, the Utility has implemented operational changes and investments that reduce wildfire risk, including:

- *Enhanced Powerline Safety Settings:* In 2021, the Utility implemented the EPSS program, which adjusts the sensitivity of circuit protection devices on certain power lines to de-energize them more rapidly in the event of a disturbance to help prevent potential ignitions. After EPSS was initiated, CPUC-reportable ignitions were reduced substantially on EPSS-enabled circuits, compared to the prior three-year average.
- *Public Safety Power Shutoffs:* The PSPS program proactively de-energizes power lines in response to forecasted weather conditions. Since its inception in late 2017, the PSPS program has become more targeted because the Utility has developed more granular risk models, including adding consideration of vegetation management and maintenance tag statuses for scoping PSPS events. The Utility has also installed sectionalizers for more strategic de-energizations of circuits and transmission lines.
- *Vegetation management:* The Utility inspects its overhead electric distribution and transmission facilities on an annual basis to identify and clear vegetation that might grow or fall into utility equipment. In addition, the Utility operates an EVM program for distribution facilities in HFTD areas. The Utility is also increasing oversight and engagement with the contractors supporting vegetation management work.
- *Asset inspections:* Since 2018, the Utility has reoriented its asset inspections programs toward asset condition and consequence risk, particularly wildfire risk, and have become more thorough, standardized, digitized, and verifiable. The Utility uses risk-informed inspection cycles. In 2021, the Utility continued to refine its risk modeling, including further incorporating data from asset inspections.
- *System hardening:* System hardening entails replacing or eliminating existing distribution lines in HFTDs and installing stronger and more resilient equipment. Hardening methods include replacing bare overhead conductor with covered conductor and installing stronger poles, removing the line and serving our customers through remote grids, or converting the line from overhead to underground. In 2021, the Utility announced a commitment to underground 10,000 miles of electric distribution lines in HFTDs, which will eliminate ignition risks from overhead vegetation or wind-induced equipment failures in those areas and help reduce the need for vegetation management.

Even as the Utility works to mitigate wildfire risk, it also works to reduce the impact of those mitigations on its customers, including making the PSPS program less disruptive through sectionalizing devices for both distribution and transmission lines, temporary generation applications, and implementation of microgrid pilot technologies. For example, in 2021, the CPUC authorized the Utility to prepare 10 substations to form microgrids in the event of PSPS outages impacting the transmission lines feeding those substations, in addition to nine other distribution microgrids that the Utility made ready to operate in 2021. Two of the distribution microgrids piloted battery storage and a linear generator in a hybrid configuration with diesel generation to assist in energizing the microgrids when needed. Through these and other mitigation actions, PSPS events in 2021 impacted 78% fewer customers on average than PSPS events in 2019. The Utility also brought online its first “remote grid” in 2021, which allows distribution lines in HFTDs to be removed and replaced with locally sited resources. Remote grids can reduce costs and fire risks, while maintaining service to impacted customers. The Utility is pursuing the development of additional remote grid projects.

In 2021, the Utility also worked to reduce the impact of EPSS by adjusting the sensitivity of devices to reduce the likelihood of an outage, improving coordination between its devices to reduce the size of outages, and improving internal coordination of patrol crews for faster restoration times. In 2022, the Utility plans to expand the scope of the EPSS program to all HFTD areas.

The Utility has focused on continuously improving its gas operations safety record. Since the San Bruno natural gas pipeline explosion in 2010, the Utility’s asset safety efforts have included replacing distribution mains and transmission pipelines, as well as strength testing transmission pipelines. The Utility uses in-line inspections to assess the integrity of transmission pipelines. The Utility also uses safety and control systems to monitor, gather, and process real-time data on its gas system. In 2021, the Utility’s gas operations achieved zero workforce serious injuries and fatalities (“SIF-A”) incidents and reductions in the number of injuries that result in days away, restricted or transferred duty per 200,000 hours worked (“DART”). As of the date of this filing, the Utility’s gas system has not had a public safety-related incident that resulted in a fatality or injury since 2015 or 2018, respectively.

The Utility has engaged in educating employees, contractors, and the public regarding safe digging programs and practices for their awareness during construction and when digging near the Utility’s underground gas and electric assets. The Utility also installed safety devices that automatically detect increasing pressure on systems and stop the flow of gas to avoid outages and overpressure events. Additionally, the Utility continues to streamline its efforts to respond to outages timely. The Utility’s outage response is designed to keep the public safe while limiting customer outages and returning service safely and as quickly as possible.

The Utility’s generation operations have focused on safety and reliability. In 2021, the Utility’s generation operations achieved zero SIF-A incidents and reductions in DART. Challenged by a drought year, the Utility scheduled dispatch and rescheduled outages to maximize availability during the summer months when demand for electricity is highest. The Utility is working to implement a comprehensive generation asset management strategy and further mature its outage and project management capabilities.

### Regulatory Environment

The Utility’s business is subject to the regulatory jurisdiction of various agencies at the federal, state, and local levels. At the state level, the Utility is regulated primarily by the CPUC. At the federal level, the Utility is regulated primarily by the FERC and the NRC. The Utility is also subject to the requirements of other federal, state and local regulatory agencies, including with respect to safety, the environment, and health, such as the NTSB and OEIS.

This section and the “Environmental Regulation” and the “Ratemaking Mechanisms” sections below summarize some of the more significant laws, regulations, and regulatory proceedings affecting the Utility. For more information, see Item 1A. Risk Factors and “Regulatory Matters” in Item 7. MD&A.

PG&E Corporation is a “public utility holding company” as defined under the Public Utility Holding Company Act of 2005 and is subject to regulatory oversight by the FERC. PG&E Corporation and its subsidiaries are exempt from all requirements of the Public Utility Holding Company Act of 2005 other than the obligation to provide access to their books and records to the FERC and the CPUC for ratemaking purposes.

### California Public Utilities Commission

The CPUC is a regulatory agency that regulates privately owned public utilities in California. The CPUC has jurisdiction over the rates and terms and conditions of service for the Utility’s electric and natural gas distribution operations, electric generation, and natural gas transmission and storage services. The CPUC also has exercised jurisdiction over the Utility’s issuances of securities, dispositions of utility assets and facilities, energy purchases on behalf of the Utility’s electric and natural gas retail customers, rates of return, rates of depreciation, oversight of nuclear decommissioning, and aspects of the siting of facilities used in providing electric and natural gas utility service.

The CPUC enforces state laws and regulations that set forth safety requirements pertaining to the design, construction, testing, operation, and maintenance of utility gas and electric facilities. The CPUC can impose penalties of up to $100,000 per day, per violation. The CPUC has wide discretion to determine the amount of penalties based on the totality of the circumstances, including such factors as the gravity of the violations; the type of harm caused by the violations and the number of persons affected; and the good faith of the entity charged in attempting to achieve compliance, after notification of a violation. The CPUC also is required to consider the appropriateness of the amount of the penalty to the size of the entity charged.

The CPUC has delegated authority to the SED to issue citations and impose penalties for violations identified through audits, investigations, or self-reports. Under the current gas and electric citation programs adopted by the CPUC in September 2016, the SED has discretion whether to issue a penalty for each violation; but if it assesses a penalty for a violation, it has the authority to impose the maximum statutory penalty of $100,000 per day, with an administrative limit of $8 million per citation issued. Similar to penalties imposed by the CPUC, penalty payments for citations issued pursuant to the gas and electric safety citation programs are the responsibility of shareholders of an issuer and may not be recovered in rates or otherwise directly or indirectly charged to customers. The CPUC has also authorized the SED to propose for CPUC approval administrative consent orders and administrative enforcement orders when the SED deems a formal OII unnecessary.

The California State Legislature also directs the CPUC to implement state laws and policies, such as the laws relating to wildfires and wildfire cost recovery, increasing renewable energy resources, the development and widespread deployment of distributed generation and self-generation resources, the reduction of GHG emissions, the establishment of energy storage procurement targets, and the development of a state-wide EV charging infrastructure. The CPUC is responsible for approving funding and administration of state-mandated public purpose programs such as energy efficiency and other customer programs. The CPUC also conducts audits and reviews of the Utility’s accounting, performance, and compliance with regulatory guidelines.

The CPUC has imposed various conditions that govern the relationship between the Utility and PG&E Corporation and other affiliates, including financial conditions that require PG&E Corporation’s Board of Directors to give first priority to the capital requirements of the Utility, as determined to be necessary and prudent to meet the Utility’s obligation to serve or to operate the Utility in a prudent and efficient manner. For more information on specific CPUC enforcement matters and CPUC-implemented laws and policies and the related impact on PG&E Corporation and the Utility, see Item 1A. Risk Factors, and “Enforcement and Litigation Matters,” “Regulatory Matters,” “Legislative and Regulatory Initiatives” and “Liquidity and Financial Resources” in Item 7. MD&A and Note 15 of the Notes to the Consolidated Financial Statements in Item 8.

### Federal Energy Regulatory Commission and California Independent System Operator Corporation

The FERC has jurisdiction over the Utility’s electric transmission revenue requirements and rates, the licensing of substantially all of the Utility’s hydroelectric generation facilities, and the interstate sale and transportation of natural gas. The FERC regulates the interconnections of the Utility’s transmission systems with other electric systems and generation facilities, the tariffs and conditions of service of regional transmission organizations, and the terms and rates of wholesale electricity sales. The FERC also is charged with adopting and enforcing mandatory standards governing the reliability of the nation’s electric transmission grid, including standards to protect the nation’s bulk power system against potential disruptions from cyber and physical security breaches. The FERC’s approval is also required under Federal Power Act Section 203 before undertaking certain transactions, including most mergers and consolidations, certain transactions that result in a change in control of a utility, purchases of utility securities and dispositions of utility property. The FERC has authority to impose fines of up to $1 million per day for violations of certain federal statutes and regulations. For more information on specific FERC requirements and their impact on PG&E Corporation and the Utility, see Item 1A. Risk Factors, and “Regulatory Matters,” “Legislative and Regulatory Initiatives” and “Liquidity and Financial Resources” in Item 7. MD&A and Note 15 of the Notes to the Consolidated Financial Statements in Item 8.

The CAISO is the FERC-approved regional transmission organization for the Utility’s service territory. The CAISO controls the operation of the electric transmission system in California and provides open access transmission service on a non-discriminatory basis. The CAISO is also responsible for planning transmission system additions, ensuring the maintenance of adequate reserves of generating capacity, ensuring that the reliability of the transmission system is maintained, and operating an interstate energy imbalance market.

### Nuclear Regulatory Commission

The NRC oversees the licensing, construction, operation and decommissioning of nuclear facilities, including the Utility’s two nuclear generating units at Diablo Canyon and the Utility’s retired nuclear generating unit at Humboldt Bay. See “Electricity Resources” below. NRC regulations require extensive monitoring and review of the safety, radiological, seismic, environmental, and security aspects of these facilities. In the event of non-compliance, the NRC has the authority to impose fines or to force a shutdown of a nuclear plant, or both. NRC safety and security requirements have, in the past, necessitated substantial capital expenditures at Diablo Canyon, and substantial capital expenditures could be required in the future. For more information about Diablo Canyon, see Item 1A. Risk Factors and Note 15 of the Notes to the Consolidated Financial Statements in Item 8.

### Other Regulators

The California Energy Commission is California’s primary energy policy and planning agency. The CEC is responsible for licensing all thermal power plants over 50 MW within California. The CEC also is responsible for forecasts of future energy needs used by the CPUC in determining the adequacy of the utilities’ electricity procurement plans and for adopting building and appliance energy efficiency requirements.

The CARB is the state agency responsible for setting and monitoring GHG and other emission limits. The CARB is also responsible for adopting and enforcing regulations to implement state law requirements to gradually reduce GHG emissions in California. See “Environmental Regulation - Air Quality and Climate Change” below.

The NTSB is an independent U.S. government investigative agency responsible for civil transportation accident investigations, including pipeline accidents. The NTSB also conducts special investigations and safety studies, and issues safety recommendations to prevent future accidents.

The California Geologic Energy Management Division is the state agency responsible for establishing and enforcing regulations for the operation of the Utility’s underground gas storage wells.

The OEIS is a state agency responsible for reviewing and approving the Utility’s WMP and for evaluating the Utility’s implementation of the WMP.

In addition, the Utility obtains permits, authorizations, and licenses in connection with the construction and operation of the Utility’s generation facilities, electricity transmission lines, natural gas transportation pipelines, and gas compressor station facilities. The Utility also periodically obtains permits, authorizations, and licenses in connection with distribution of electricity and natural gas that grant the Utility rights to occupy or use public property for the operation of the Utility’s business and to conduct certain related operations. The Utility has franchise agreements with approximately 300 cities and counties that permit the Utility to install, operate, and maintain the Utility’s electric and natural gas facilities in the public streets and highways. In exchange for the right to use public streets and highways, the Utility pays annual fees to the cities and counties. In most cases, the Utility’s franchise agreements are for an indeterminate term, with no expiration date. For more information see Item 1A. Risk Factors.

### Third-party Monitors

On April 12, 2017, the Utility retained the Monitor at the Utility’s expense as part of its compliance with the sentencing terms of the Utility’s January 27, 2017 federal criminal conviction, which sentenced the Utility to, among other things, a five-year corporate probation period and oversight by the Monitor for a period of five years. On January 25, 2022, the period of probation expired and the Monitor’s oversight of the Utility ended. For more information see Item 1A. Risk Factors and “US District Court Matters and Probation” under “Enforcement and Litigation Matters” in Item 7. MD&A.

Additionally, as a condition to its approval of the Plan, the CPUC required the appointment of an independent safety monitor (the “Independent Safety Monitor”) for a term of five years, subject to extension if the CPUC determines that the Utility’s safety conditions would benefit from an Independent Safety Monitor’s continued involvement. On January 28, 2022, the CPUC announced that it had selected Filsinger Energy Partners to serve as the Independent Safety Monitor. According to the scope of work authorized by the CPUC, the Independent Safety Monitor will (1) monitor and alert CPUC staff whether the Utility is implementing its highest priority and risk-driven safety mitigations and (2) monitor the Utility’s safety-related recordkeeping and record management systems. In addition to confidential updates to the CPUC staff regarding safety-related concerns, the Independent Safety Monitor will also provide public summary reports of its activities to the CPUC every six months.

### Material Effects of Compliance with Governmental Regulations

As indicated above, the Utility’s business is subject to the regulatory jurisdiction of various agencies at the federal, state, and local levels. Compliance with such extensive government regulations requires substantial expenditures and has had in the past and may continue to have in the future a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, cash flows and competitive position. Generally, the Utility expects to recover the cost of compliance with government regulations through rates in its GRC proceedings, or other proceedings. To the extent the Utility incurs costs above authorized or incurs additional types of costs not included in rates, the Utility would expect to apply for recovery of such costs. Such recovery would be subject to the CPUC’s approval and could involve its reasonableness review.

Costs incurred in 2021 included costs in connection with upgrading and maintaining the Utility’s electric and natural gas infrastructure in accordance with CPUC and federal requirements, participating in the Wildfire Fund under AB 1054, execution of wildfire mitigation initiatives, the licensing and other regulations of the FERC, environmental regulations, clean energy standards, regulations regarding Diablo Canyon, and various other generation, distribution and storage regulations, the amount of which was substantial.

If the Utility is unable to recover these costs or incurs fines or penalties as a result of non-compliance with such laws and regulations, PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, cash flows and competitive position could be materially impacted. For more information, see Item 1A. Risk Factors, “Regulatory Matters” in Item 7. MD&A, and Notes 14 and 15 of the Notes to the Consolidated Financial Statements in Item 8.

### Environmental Regulation

The Utility’s operations are subject to extensive federal, state, and local laws and requirements relating to the protection of the environment and the safety and health of the Utility’s personnel and the public. These laws and requirements relate to a broad range of activities, including the remediation of hazardous and radioactive substances; the discharge of pollutants into the air, water, and soil; the reporting and reduction of CO2 and other GHG emissions; the transportation, handling, storage and disposal of spent nuclear fuel; and the environmental impacts of land use, including endangered species and habitat protection. The penalties for violation of these laws and requirements can be severe and may include significant fines, damages, and criminal or civil sanctions. These laws and requirements also may require the Utility, under certain circumstances, to interrupt or curtail operations. See Item 1A. Risk Factors. Generally, the Utility recovers most of the costs of complying with environmental laws and regulations through the Utility’s rates, subject to reasonableness review. Environmental costs associated with the clean-up of most sites that contain hazardous substances are subject to a ratemaking mechanism described in Note 15 of the Notes to the Consolidated Financial Statements in Item 8.

### Hazardous Waste Compliance and Remediation

The Utility’s facilities are subject to various regulations adopted by the EPA, including the Resource Conservation and Recovery Act and the Comprehensive Environmental Response, Compensation and Liability Act of 1980, as amended. The Utility is also subject to the regulations adopted by other federal agencies responsible for implementing federal environmental laws. The Utility also must comply with environmental laws and regulations adopted by the State of California and various state and local agencies. These federal and state laws impose strict liability for the release of a hazardous substance on the (1) owner or operator of the site where the release occurred, (2) on companies that disposed of, or arranged for the disposal of, the hazardous substances, and (3) in some cases, their corporate successors. Under the Comprehensive Environmental Response, Compensation and Liability Act, these persons (known as “potentially responsible parties”) may be jointly and severally liable for the costs of cleaning up the hazardous substances, monitoring and paying for the harm caused to natural resources, and paying for the costs of health studies.

The Utility has a comprehensive program in place to comply with these federal, state, and local laws and regulations. Under federal and California laws, the Utility may be responsible for remediation of hazardous substances even if it did not deposit those substances on the site. The Utility’s remediation activities are overseen by the California DTSC, several California regional water quality control boards, and various other federal, state, and local agencies. The Utility has incurred significant environmental remediation liabilities associated with former MGP sites, power plant sites, gas gathering sites, sites where natural gas compressor stations are located, and sites used by the Utility for the storage, recycling, or disposal of potentially hazardous substances. Groundwater at the Utility’s Hinkley and Topock natural gas compressor stations contains hexavalent chromium as a result of the Utility’s past operating practices. The Utility is responsible for remediating this groundwater contamination and for abating the effects of the contamination on the environment.

For more information about environmental remediation liabilities, see Note 15 of the Notes to the Consolidated Financial Statements in Item 8.

### Air Quality and Climate Change

The Utility’s electric generation plants, natural gas pipeline operations, vehicle fleet, and fuel storage tanks are subject to numerous air pollution control laws, including the federal Clean Air Act, as well as state and local statutes. These laws and regulations cover, among other pollutants, those contributing to the formation of ground-level ozone, carbon dioxide (CO2), sulfur dioxide (SO2), nitrogen oxides (NOx), particulate matter, and other emissions.

#### Federal Regulation

At the federal level, the EPA is charged with implementation and enforcement of the Clean Air Act. Although there have been several legislative attempts to address climate change through imposition of nationwide regulatory limits on GHG emissions, comprehensive federal legislation has not yet been enacted. In the absence of federal legislative action, the EPA has used its existing authority under the Clean Air Act to address GHG emissions.

Tackling the climate crisis is a key priority of the Biden Administration, and the Administration has signaled its intent to use its executive and regulatory authorities to reduce emissions in line with science-based targets. On January 20, 2021, President Biden issued an EO directing the EPA to consider suspending, revising or rescinding the Trump Administration’s rule for methane emissions from new sources in the oil and gas sector and propose a companion regulation for existing sources, including the transmission, processing and storage segments of the industry. For power plants, the EPA is expected to propose a more stringent GHG standard for existing sources in the wake of challenges to the Trump Administration’s Affordable Clean Energy rule.

#### State Regulation

California’s AB 32, the Global Warming Solutions Act of 2006, provided for the gradual reduction of state-wide GHG emissions to 1990 levels by 2020. The CARB has approved various regulations to achieve the 2020 target, including GHG emissions reporting and a state-wide, comprehensive cap-and-trade program that sets gradually declining limits (or “caps”) on the amount of GHGs that may be emitted by major GHG emission sources within different sectors of the economy.

The cap-and-trade program’s first compliance period, which began on January 1, 2013, applied to the electric generation and large industrial sectors. In the subsequent compliance period, which began on January 1, 2015, the scope of the regulation was expanded to include the natural gas and transportation sectors, effectively covering all of the state economy’s major sectors through 2020. The Utility’s compliance obligation as a natural gas supplier applies to the GHG emissions attributable to the combustion of natural gas delivered to the Utility’s customers other than large natural gas delivery customers that are separately regulated as covered entities and have their own compliance obligation.

In 2017, AB 398 extended the cap-and-trade program through January 1, 2031. During each year of the program, the CARB issues emission allowances (i.e., the rights to emit GHGs) equal to the amount of GHG emissions allowed for that year. Entities with a compliance obligation can obtain allowances from the CARB at quarterly auctions or from third parties or exchanges. Complying entities may also satisfy a portion of their compliance obligation through the purchase of offset credits (e.g., credits for GHG reductions achieved by third parties, such as landowners, livestock owners, and farmers, that occur outside of the entities’ facilities through CARB-qualified offset projects such as reforestation or biomass projects). The Utility expects all costs and revenues associated with the GHG cap-and-trade program to be passed through to customers.

SB 32 (2016) requires that CARB ensure a 40% reduction in GHGs by 2030 compared to 1990 levels. The California RPS program that requires utilities to gradually increase the amount of renewable energy delivered to their customers is also expected to help reduce GHG emissions in California. In September 2018, SB 100 was signed into law, which accelerated California’s 50% RPS target to December 31, 2026, increased the RPS target to 60% by December 31, 2030, and further amended the RPS statute to set a policy of meeting 100% of retail sales from eligible renewables and zero-carbon resources by December 31, 2045. Additionally, EO B-55-18 set a statewide goal to achieve economy-wide carbon neutrality by 2045 and to maintain net negative emissions thereafter. The Utility will be an active participant in regulatory proceedings to determine how the state will achieve carbon neutrality. For the percentage of the Utility’s estimated total net deliveries of electricity to customers in 2021, including estimated GHG-free and renewable energy percentages, see “Electric Utility Operations-Electricity Resources” below.

#### Climate Change Resilience Strategies

During 2021, the Utility continued its programs to mitigate the impact of the Utility’s operations (including customer energy usage) on the environment and to take actions to increase its resilience to the physical impacts of climate change on the Utility’s operations. The Utility regularly reviews the most relevant scientific literature on climate change such as rising sea levels, major storm events, increasing temperatures and heatwaves, wildfires, drought and land subsidence, to help the Utility identify and evaluate climate change-related risks and develop resilience strategies. The Utility maintains emergency response plans and procedures to address a range of near-term risks, including wildfires, extreme storms, and heat waves and considers climate hazards in its risk-assessment process to account for long-term risks associated with climate change. The Utility also engages with leaders from business, government, academia, and non-profit organizations to share information and plan for the future.

The Utility is continuing its work to better understand the current and future impacts of climate change. Climate change is incorporated into the Utility’s Risk Assessment Mitigation Phase (“RAMP”) filing, which describes its quantitative risk modeling process and major risks. The Utility also considers the RAMP analysis in developing its infrastructure investment plans. Additionally, the Utility is conducting a system-wide CVA focused on 2050 to identify and help prioritize the Utility’s climate-driven hazards. Concurrent with the CVA are efforts to align key processes with the best available climate projections. For example, the Utility is currently reviewing and updating equipment design standards that rely on historically observed heat thresholds, which are not expected to be predictive of future temperatures.

With respect to electric operations, climate scientists project that climate change will lead to increased electricity demand due to more extreme and frequent hot weather. The Utility believes its strategies to reduce GHG emissions through energy efficiency and demand response programs, infrastructure improvements, and the use of renewable energy and energy storage will help it adapt to the expected changes in demand for electricity. The Utility is making substantial investments to build a more resilient system that can better withstand extreme weather and related emergencies. For more information on such investments, see “Performance: Underpinning The Triple Bottom Line” above. Over the long term, the Utility also faces the risk of higher flooding and inundation potential at coastal and low elevation facilities due to projected sea level rise combined with high tides, storm runoff and storm surges. Inland areas, such as near the Sacramento-San Joaquin River Delta, will also be vulnerable to flooding amid changes to precipitation patterns and extreme storms. As the state continues to face increased risk of wildfires, the Utility’s wildfire mitigation activities, including vegetation management and undergrounding electric powerlines, will continue to play an important role to help reduce the risk of wildfire and its impact on electric and gas facilities.

Climate scientists predict that climate change will result in rising temperatures and changes in precipitation patterns in the Utility’s service territory, including decreasing snowpack. This could, in turn, affect the Utility’s hydroelectric generation. This issue is being analyzed as part of the Utility’s CVA. To plan for this change, the Utility is engaging with state and local stakeholders and is also adopting strategies such as maintaining higher winter carryover reservoir storage levels, reducing discretionary reservoir water releases, and collaborating on research and new modeling tools.

With respect to natural gas operations, both safety-related pipeline strength testing and normal pipeline maintenance and operations release the GHG methane into the atmosphere. The Utility has taken steps to reduce the release of methane by implementing techniques including drafting and cross-compression, which reduce the pressure and volume of natural gas within pipelines prior to venting. In addition, the Utility continues to achieve reductions in methane emissions by implementing improvements in leak detection and repair, upgrades at metering and regulating stations, and maintenance and replacement of other pipeline materials. The Utility is also actively engaged with renewable natural gas producers to facilitate supply interconnections with the Utility’s natural gas pipeline system and is participating in CPUC proceedings that evaluate standards to allow for the injection of hydrogen into natural gas systems and decarbonization through electrification.

### Emissions Data

PG&E Corporation and the Utility track and report their annual environmental performance results across a broad spectrum of areas. The Utility reports its GHG emissions to the CARB and the EPA on a mandatory basis. On a voluntary basis, the Utility reports a more comprehensive emissions inventory to The Climate Registry, a non-profit organization. The Utility’s third-party verified voluntary GHG inventory reported to The Climate Registry for 2020, which is the most recent data available, totaled more than 44 million metric tons of CO2 equivalent, the majority of which came from customer natural gas use. The following table shows the 2020 GHG emissions data the Utility reported to the CARB under AB 32, which is the most recent data available. PG&E Corporation and the Utility also publish additional GHG emissions data in their annual Corporate Sustainability Report.

| Source | Amount (metric tons CO2 equivalent) |
| --- | ---: |
| Fossil Fuel-Fired Plants (1) | 2,550,622 |
| Natural Gas Compressor Stations and Storage Facilities (2) | 315,802 |
| Distribution Fugitive Natural Gas Emissions | 497,512 |
| Customer Natural Gas Use (3) | 40,304,583 |

(1) Includes nitrous oxide and methane emissions from the Utility’s generating stations.

(2) Includes emissions from compressor stations and storage facilities that are reportable to CARB.

(3) Includes emissions from the combustion of natural gas delivered to all entities on the Utility’s distribution system, with the exception of gas delivered to other natural gas local distribution companies.

The Utility utilized the CEC’s Power Source Disclosure program methodology to calculate the CO2 emissions rate associated with the electricity delivered to retail customers in 2020. This resulted in a third-party verified CO2 emissions rate of 160 pounds of CO2 per MWh.

### Air Emissions Data for Utility-Owned Generation

In addition to GHG emissions data provided above, the table below sets forth information about the air emissions from the Utility’s owned generation facilities. PG&E Corporation and the Utility also publish air emissions data in their annual Corporate Sustainability Report.

|  | 2020 | 2019 |
| --- | ---: | ---: |
| Total NOx Emissions (tons) | 141 | 135 |
| NOx Emissions Rate (pounds/MWh) | 0.01 | 0.01 |
| Total SO2 Emissions (tons) | 15 | 14 |
| SO2 Emissions Rate (pounds/MWh) | 0.001 | 0.001 |

### Nuclear Fuel Disposal

Under the Nuclear Waste Policy Act of 1982, the DOE and electric utilities with commercial nuclear power plants were authorized to enter into contracts under which the DOE would be required to dispose of the utilities’ spent nuclear fuel and high-level radioactive waste by January 1998, in exchange for fees paid by the utilities’ customers. The DOE has been unable to meet its contractual obligation with the Utility to dispose of nuclear waste from the Utility’s two nuclear generating units at Diablo Canyon and the retired nuclear facility at Humboldt Bay. As a result, the Utility constructed interim dry cask storage facilities to store its spent fuel onsite at Diablo Canyon and at Humboldt Bay until the DOE fulfills its contractual obligation to take possession of the spent fuel. The Utility and other nuclear power plant owners sued the DOE to recover the costs that they incurred to construct interim storage facilities for spent nuclear fuel.

In September 2012, the U.S. Department of Justice and the Utility executed a settlement agreement that provided a claims process by which the Utility submits annual requests for reimbursement of its ongoing spent fuel storage costs. The claim for the period June 1, 2020 through May 31, 2021, totaled approximately $11.6 million and is currently under review by the DOE. Amounts reimbursed by DOE are refunded to customers through rates. Considerable uncertainty continues to exist regarding when and whether the DOE will meet its contractual obligation to the Utility and other nuclear power plant owners to dispose of spent fuel.

### Ratemaking Mechanisms

The Utility’s rates for electric and natural gas utility services are generally set at levels that are intended to allow the Utility to recover its costs of providing service and a return on invested capital (“cost-of-service ratemaking”). In order to set rates, the CPUC and the FERC conduct proceedings to determine the amount that the Utility will be authorized to collect from its customers (“revenue requirements”). The Utility’s revenue requirements consist primarily of a base amount set to enable the Utility to recover its reasonable operating expenses (e.g., maintenance, administration and general expenses) and capital costs (e.g., depreciation, and financing expenses). In addition, the CPUC authorizes the Utility to collect revenues to recover costs that the Utility is allowed to “pass-through” to customers (referred to as “Utility Revenues and Costs that did not Impact Earnings” in Item 7. MD&A), including its costs to procure electricity and natural gas for customers and to administer public purpose and customer programs.

The Utility’s rate of return on electric transmission assets is determined in the FERC TO proceedings. The rate of return on all other Utility assets is set in the CPUC’s cost of capital proceeding. Other than certain gas transmission and storage revenues, the Utility’s base revenues are “decoupled” from its sales volume through certain regulatory balancing accounts, or revenue adjustment mechanisms, that are designed to allow the Utility to collect its authorized base revenue requirements regardless of sales volume. As a result, the Utility’s base revenues are not impacted by fluctuations in sales resulting from, for example, weather or economic conditions. The Utility’s earnings primarily depend on its ability to manage its base operating and capital costs (referred to as “Utility Revenues and Costs that Impacted Earnings” in Item 7. MD&A) within its authorized base revenue requirements.

Due to the seasonal nature of the Utility’s business and rate design, customer electric bills are generally higher during summer months (May to October) because of higher demand, driven by air conditioning loads. Customer bills related to gas service are generally higher during winter months (November to March) because of higher demand due to heating.

From time to time, the CPUC may use incentive ratemaking mechanisms that provide the Utility an opportunity to earn some additional revenues. For example, the Utility has earned incentives for the successful implementation of energy efficiency programs.

See “Regulatory Matters” in Item 7. MD&A for more information on specific CPUC proceedings.

### Base Revenues

#### General Rate Cases

The GRC is the primary proceeding in which the CPUC determines the amount of base revenue requirements that the Utility is authorized to collect from customers to recover the Utility’s anticipated costs related to its electric distribution, natural gas distribution, and Utility-owned electric generation operations and return on rate base. In the past, the CPUC has generally conducted a GRC every three years. Starting with the 2023 GRC, the CPUC will conduct a GRC every four years that includes the Utility’s costs of its gas transmission and storage facilities. The CPUC approves the annual revenue requirements for the first year (or “test year”) of the GRC period and typically authorizes the Utility to receive annual increases in revenue requirements for the subsequent years of the GRC period (known as “attrition years”). Attrition year rate adjustments are generally authorized for cost increases related to invested capital and inflation. Parties in the Utility’s GRC include the Public Advocates Office of the CPUC (formerly known as Office of Ratepayer Advocates or ORA) and TURN, which generally represent the overall interests of residential customers, as well as numerous intervenors, that represent other business, community, customer, environmental, and union interests. For more information about the Utility’s GRC, see “Regulatory Matters - 2020 General Rate Case” and “Regulatory Matters - 2023 General Rate Case” in Item 7. MD&A.

#### Cost of Capital Proceedings

The CPUC periodically conducts a cost of capital proceeding to authorize the Utility’s capital structure and rates of return for its electric generation, electric and natural gas distribution, and natural gas transmission and storage rate base. The CPUC’s cost of capital proceedings generally take place in a consolidated proceeding with California’s other large investor-owned electric and gas utilities. For more information about the cost of capital proceedings, see “Regulatory Matters - Cost of Capital Proceedings” in Item 7. MD&A.

#### Electricity Transmission Owner Rate Cases

The FERC determines the amount of authorized revenue requirements, including the rate of return on electric transmission assets, that the Utility may collect in rates in the TO rate case. In its TO rate cases, the Utility uses a formula rate methodology, which includes an authorized revenue requirement and rate base for a given year but also provides for an annual update of the following year’s revenue requirement and rates in accordance with the terms of the FERC-approved formula. Under the formula rate mechanism, transmission revenue requirements are updated to the actual cost of service annually as part of the true-up process. Differences between amounts collected and determined under the formula rate are either collected from or refunded to customers. The FERC-approved formula rate will be effective through December 31, 2023. These FERC-approved rates are included by the CPUC in the Utility’s retail electric rates and by the CAISO in its Transmission Access Charges to wholesale customers. For more information, see “Regulatory Matters - Transmission Owner Rate Cases” in Item 7. MD&A. The Utility also recovers a portion of its revenue requirements for its wholesale electric transmission costs through charges collected under specific contracts with wholesale transmission customers that the Utility entered into before the CAISO began its operations. These wholesale customers are charged individualized rates based on the terms of their contracts.

#### Program-Specific Memorandum Account and Balancing Account Costs

Periodically, costs arise outside of the CPUC GRC rate requests or that have been deliberately excluded therefrom. These costs may result from catastrophic events, changes in regulation, new programs, or extraordinary changes in operating practices. The Utility may seek authority to track incremental costs in a memorandum account and the CPUC may authorize recovery of costs tracked in memorandum accounts if the costs are deemed reasonable. For instance, these accounts allow the Utility to track the costs associated with work related to disaster and wildfire response, and other wildfire prevention-related costs. Recovery of the costs tracked in these memorandum accounts in rates requires CPUC authorization in separate proceedings for which the Utility may be unable to predict the outcome. Alternatively, the Utility may seek authority to track incremental costs related to these non-GRC programs in balancing accounts. The CPUC may authorize recovery of costs tracked in the balancing accounts on either a “one-way” basis, which only allows actual costs to be recovered up to a pre-established cap, or a “two-way” basis, which allows actual costs to be recovered, subject to CPUC review. For more information, see “Regulatory Matters - Cost Recovery Proceedings” in Item 7. MD&A and Note 4 of the Notes to the Consolidated Financial Statements in Item 8.

### Revenues to Recover Energy Procurement and Other Pass-Through Costs

#### Electricity Procurement Costs

California IOUs are responsible for procuring electrical capacity required to meet bundled customer demand, plus applicable reserve margins, that are not satisfied from their own generation facilities and existing electric contracts. The utilities are responsible for scheduling and bidding electric generation resources, including certain electricity procured from third parties into the wholesale market, to meet customer demand according to which resources are the least expensive (i.e., using the principles of “least-cost dispatch”). In addition, the utilities are required to obtain CPUC approval of their BPPs based on long-term demand forecasts. In October 2015, the CPUC approved the Utility’s most recent comprehensive BPP. It was revised since its initial approval and will remain in effect as revised until superseded by a subsequent CPUC-approved plan.

California law allows electric utilities to recover the costs incurred in compliance with their CPUC-approved BPPs without further after-the-fact reasonableness review by the CPUC. The CPUC may disallow costs associated with electricity purchases if the costs were not incurred in compliance with the CPUC-approved plan or if the CPUC determines that the utility failed to follow the principles of least-cost dispatch. Additionally, the CPUC may disallow the value of lost generation due to unplanned outages at utility-owned generation facilities.

The Utility recovers its electric procurement costs annually primarily through balancing accounts. See Note 4 of the Notes to the Consolidated Financial Statements in Item 8. Each year, the CPUC reviews the Utility’s forecasted procurement costs related to power purchase agreements, derivative instruments, GHG emissions costs, and generation fuel expense, and approves a forecasted revenue requirement. The CPUC may adjust the Utility’s retail electric rates more frequently if the forecasted aggregate over-collections or under-collections in the Energy Resource Recovery Account, net of Portfolio Allocation Balancing Account balances, exceed five percent of its prior year electric procurement and Utility-owned generation revenues. The CPUC performs an annual compliance review of the procurement transactions recovered in various balancing accounts, including the Energy Resource Recovery Account and the Portfolio Allocation Balancing Account.

The CPUC has approved various power purchase agreements that the Utility has entered into with third parties in accordance with the Utility’s CPUC-approved BPP, to meet mandatory renewable energy targets, and to comply with RA requirements. For more information, see “Electric Utility Operations - Electricity Resources” below as well as Note 15 of the Notes to the Consolidated Financial Statements in Item 8.

The Utility is also responsible, as the central procurement entity (“CPE”) for its distribution service area, for seeking to procure the entire amount of required local RA on behalf of all load serving entities in its distribution service area. The decision grants the Utility, acting as CPE, discretion to defer procurement of local resources to the CAISO’s backstop mechanisms if bid costs are deemed unreasonably high. The Utility, as the CPE, will not be assessed fines or penalties for failing to procure resources to meet the local RA requirements and deferring local procurement to the CAISO backstop mechanism, as long as the CPE exercised reasonable efforts to secure capacity and certain specified requirements are met. In connection with its CPE function, the Utility is responsible for making compliance demonstrations to the CPUC and the CAISO. The Utility recovers its administrative and procurement costs associated with its CPE function through a balancing account. Each year, the CPUC reviews the Utility’s forecasted administrative costs related to the CPE function and approves a forecasted revenue requirement associated with the administrative costs. The CPUC performs an annual compliance review of the CPE function, including procurement transactions with terms of five years or less (for which costs incurred in compliance with certain prescribed criteria are deemed reasonable and pre-approved without further after-the-fact reasonableness review). Procurement transactions with terms exceeding five years are reviewed separately. The CPUC may disallow costs associated with the CPE function that were not incurred in compliance with the CPUC’s decisions and guidance.

The CPUC has also approved the Power Charge Indifference Adjustment (“PCIA”). The PCIA is a cost recovery mechanism to ensure that customers who switch from the Utility’s bundled service to a non-Utility provider, such as a DA or CCA provider, pay their share of the above market costs associated with long-term power purchase commitments and Utility-owned generation made on their behalf.

#### Natural Gas Procurement, Storage, and Transportation Costs

The Utility recovers the cost of gas used in generation facilities as a cost of electricity that is recovered annually through retail electric rates.

The Utility sets the natural gas procurement rate for small commercial and residential customers (referred to as “core” customers) monthly, based on the forecasted costs of natural gas, core pipeline capacity and storage costs. The Utility recovers the cost of gas purchased on behalf of core customers as well as the cost of derivative instruments for its core gas portfolio, through its retail gas rates, subject to limits as set forth in its CPIM described below. The Utility reflects the difference between actual natural gas purchase costs and forecasted natural gas purchase costs in several natural gas balancing accounts, with under-collections and over-collections taken into account in subsequent monthly rate changes.

The CPIM protects the Utility against after-the-fact reasonableness reviews of its gas procurement costs for its core gas portfolio. Under the CPIM, the Utility’s natural gas purchase costs for a fixed 12-month period are compared to an aggregate market-based benchmark based on a weighted average of published monthly and daily natural gas price indices at the points where the Utility typically purchases natural gas. Costs that fall within a tolerance band, which is 99% to 102% of the commodity benchmark, are considered reasonable and are fully recovered through rates. One-half of the costs above 102% of the benchmark are recoverable through rates, and the Utility’s customers receive in their rates 80% of any savings resulting from the Utility’s cost of natural gas that is less than 99% of the benchmark. The Utility retains the remaining amount of these savings as incentive revenues, subject to a cap equal to 1.5% of total natural gas commodity costs. While this mechanism remains in place, changes in the price of natural gas, consistent with the market-based benchmark, are not expected to materially impact net income.

The Utility incurs transportation costs under various agreements with interstate and Canadian third-party transportation service providers. These providers transport natural gas from the points at which the Utility takes delivery of natural gas (typically in Canada, the U.S. Rocky Mountains, and the southwestern United States) to the points at which the Utility’s natural gas transportation system begins. These agreements are governed by the FERC-approved tariffs that detail rates, rules, and terms of service for the provision of natural gas transportation services to the Utility on interstate and Canadian pipelines. The FERC approves the United States tariffs that shippers, including the Utility, pay for pipeline service, and the applicable Canadian tariffs are approved by the National Energy Board, a Canadian regulatory agency. The transportation costs the Utility incurs under these agreements are recovered through CPUC-approved rates as core natural gas procurement costs or as a cost of electricity.

#### Costs Associated with Public Purpose and Customer Programs

The CPUC authorizes the Utility to recover the costs of various public purpose and other customer programs through the collection of rates from most Utility customers. These programs relate to energy efficiency, demand response, distributed generation, energy research and development, and other matters. Additionally, the CPUC has authorized the Utility to provide discounted rates for specified types of customers, such as for low-income customers under the CARE program, which is paid for by the Utility’s other customers.

#### Nuclear Decommissioning Costs

The Utility’s nuclear power facilities consist of two units at Diablo Canyon and the retired facility at Humboldt Bay. Nuclear decommissioning requires the safe removal of nuclear facilities from service and the reduction of residual radioactivity to a level that permits termination of the NRC license and release of the property for unrestricted use. Nuclear decommissioning costs are generally collected in advance through rates and are held in nuclear decommissioning trusts to be used for the eventual decommissioning of each nuclear unit. The Utility files an application with the CPUC every three years requesting approval of the Utility’s updated estimated decommissioning costs and any rate change necessary to fully fund the nuclear decommissioning trusts to the levels needed to decommission the Utility’s nuclear plants. If the nuclear decommissioning trusts are overfunded, the amount of such overfunding will be returned to customers. Pursuant to Public Utilities Code Section 8325, to the extent the monies available for decommissioning are insufficient to pay for all reasonable and prudent decommissioning costs, the CPUC must authorize the electric utility to collect these charges from its customers.

For costs related to AROs see “Nuclear Decommissioning Obligation” in Note 3 of the Notes to the Consolidated Financial Statements in Item 8.

### Human Capital

### Employees and Contractors

As of December 31, 2021, PG&E Corporation and the Utility had approximately 26,000 regular employees, 11 of whom were employees of PG&E Corporation. Of the Utility’s regular employees, approximately 16,000 are covered by collective bargaining agreements with the local chapters of three labor unions: the International Brotherhood of Electrical Workers (“IBEW”) Local 1245; the Engineers and Scientists of California (“ESC”) IFPTE 20; and the Service Employees International Union Local 24/7 (“SEIU”). The collective bargaining agreements currently in effect for the IBEW Local 1245 and ESC Local 20 will expire on December 31, 2025. The agreements increase wages annually by 3.75% from 2022 through 2025 and maintain current contributions to specified benefits. The IBEW and ESC represent approximately 62% of the Utility’s employee workforce and support several areas of the Utility’s business, including gas and electric operations. The term of the SEIU bargaining agreement ended on December 31, 2021. The parties have reached an agreement which is pending ratification by the SEIU. The Utility enjoys stable and productive relationships with its unions and did not experience any work stoppages in 2021.

PG&E Corporation’s employees are primarily at the executive management level, which experienced significant employee turnover throughout the course of its Chapter 11 Cases in 2019 and 2020. The Utility generally has a stable workforce, which translated into low voluntary turnover during that period. The Utility’s turnover rates for 2021 and 2020 were 5.8% and 4.7%, respectively. Approximately 41% of PG&E Corporation’s and the Utility’s employees have a tenure of more than 10 years, with an average tenure of 11 years. Currently, approximately 21% of PG&E Corporation’s and the Utility’s employees are eligible to retire. (PG&E Corporation and the Utility define retirement age as 55 years and older.)

The Utility’s contractors and subcontractors include approximately 35,300 individuals from approximately 1,560 contractor companies.

#### Human Capital Management

PG&E Corporation’s and the Utility’s human capital resource objectives are to build and retain an engaged, well trained, diverse, and equitable workforce. PG&E Corporation’s and the Utility’s Boards of Directors are responsible for overseeing management’s development and execution of PG&E Corporation’s and the Utility’s human capital strategy.

To build employee engagement, the Utility has a variety of both executive-level and employee-led initiatives and programs. PG&E Corporation’s and the Utility’s executive teams meet regularly to discuss and evaluate the state of employee talent, determine which programs are driving engagement and performance, and clarify the specific skills, behaviors, and values that should be cultivated. Each year, the Utility honors employees whose work embodies safety, diversity and inclusion, environmental leadership, and community service. The Utility conducts a biennial employee engagement survey, quarterly pulse surveys, and voluntary upward feedback surveys to measure and track employee engagement progress.

Every year, PG&E Corporation and the Utility offer or require technical, leadership, and employee training, which includes a range of technical training for employees on the knowledge and skills required to perform their jobs safely using approved tools and work procedures. In addition, employees are required to complete an annual compliance and ethics training and a Code of Conduct training, both of which are intended to promote a culture in which employees are encouraged to speak up with any concerns or ideas for continuous improvement. In addition, the Utility offers a variety of other trainings and education opportunities.

Among other programs, the Utility provides career opportunities through its Power Pathway™ workforce development program. Launched in 2008, PowerPathway is a workforce development model to enlarge the talent pool of local, qualified, diverse candidates for skilled craft and utility industry jobs through training program partnerships with educational, community-based and government organizations. PowerPathway helps people throughout the Utility service territory, including women and military veterans, prepare and compete for high demand jobs in the utility and energy industry. Students receive approximately eight weeks of industry-informed curriculum to ensure the academic, job specific, employability skills and physical training necessary to effectively compete for entry-level employment. Programs may also include hands-on training and on-the-job training.

PG&E Corporation and the Utility also provide integrated solutions and programs that cover employee health and wellness and that encompass physical, emotional, and financial health, including an on-site health clinic, an annual health screening, and health management tools and resources, in addition to more traditional programs.

PG&E Corporation’s and the Utility’s financial incentives offered to employees include a Short-Term Incentive Plan (“STIP”), an at-risk part of employee compensation designed to reward eligible employees for achieving specific performance goals. The 2021 STIP was focused on company objectives of safety, customer impact, and financial health.

All PG&E Corporation or Utility officer compensation currently is funded by shareholders.

#### Safety

The Utility has developed a five-year workforce safety strategy that includes two major pillars: systems and culture. Systems refers to risk management, equipment, processes and procedures. Culture refers to employee engagement, adherence to established requirements, a sense of urgency for safety, and leadership. Focus areas in the Utility’s workplace safety strategy include: an enterprise safety management system, enhanced risk management, strengthening the contractor management program, improvement of safety technical standards, ergonomics, safety audits, improving data management and reporting systems, and enhancing safety leadership training. For employees and contractors performing medium- and high-risk work, the Utility’s safety metrics include the number of SIF-A incidents and the SIF-P rate, which measures events that could have resulted in a SIF-A per 200,000 hours worked. In 2021, the Utility had five SIF-A events, which resulted in three fatalities and three serious injuries, and a SIF-P rate of 0.11, which was 10% higher than the SIF-P rate in 2020. The requirement for contractors to report SIF-P events was implemented in June 2020. Additionally, the Utility measures DART. In 2021, the Utility’s DART was 1.01, which was 25% lower than in 2020 and its lowest rate in the past five years.

Throughout the COVID-19 pandemic, PG&E Corporation and the Utility have continued to monitor activities at the Centers for Disease Control and Prevention and the World Health Organization, PG&E Corporation and the Utility have updated their protocols and actions in accordance with guidance from these organizations, following state and local health and safety regulations, and in consultation with the Utility’s medical director. PG&E Corporation and the Utility have also remained focused on protecting the health and safety of their employees, contractors and the Utility’s customers, while continuing to perform critical utility work, and have continued to monitor and track the impact of the pandemic, modifying or adopting new policies in support of their employees’ health and safety as pandemic conditions and governmental response have changed. For example, PG&E Corporation and the Utility have directed employees to work remotely from home where possible, implemented face coverings, physical distancing policies, and required a daily health check when an employee works outside his or her home, required virtual ergonomic evaluations to ensure that employees working from home so do safely and ergonomically, provided additional COVID-19 safety resources for employees who perform utility work in the field, and updated several of their employee benefits as a result of COVID-19, including healthcare benefits and interim time off and leave policies that support the care and new educational environment of children during the pandemic.

#### Diversity and Inclusion

PG&E Corporation’s and the Utility’s goal is to foster a diverse, equitable, and inclusive environment that enables all of their coworkers to bring their best selves to work so that they can provide exceptional customer service. These efforts are led by PG&E Corporation’s and the Utility’s Executive Vice President, People, Shared Services and Supply Chain, with support from the executive team. The People and Compensation Committee of PG&E Corporation’s Board of Directors reviews the companies’ diversity and inclusion practices and performance.

Key elements of PG&E Corporation’s and the Utility’s approach include active programming to heighten cultural competency, encourage understanding and appreciation of diversity, and integrate thoughtful content into training and performance support materials.

Additionally, the Utility’s 11 Employee Resource Groups and three Engineering Network Groups execute enterprise-wide programming, certain coworkers lead efforts within their departments, and other specialized teams facilitate dialogue across the companies. These efforts foster employee belonging and support an environment of inclusion that values and respects diversity in the workforce.

In 2021, women, minorities, and military veterans accounted for approximately 27%, 48% and 7%, respectively, of total PG&E Corporation and Utility employees. Approximately 8% of the Utility’s employees are younger than 30, 60% are between the ages of 30 and 49, and 32% are 50 or older.

### Electric Utility Operations

The Utility generates electricity and provides electric transmission and distribution services throughout its service territory in northern and central California to residential, commercial, industrial, and agricultural customers. The Utility provides “bundled” services (i.e., electricity, transmission, and distribution services) to customers in its service territory. Customers also can obtain electricity from alternative providers such as municipalities or CCAs, as well as from self-generation resources, such as rooftop solar installations. For more information, see “Regulatory Matters” in Item 7. MD&A.

### Electricity Resources

The Utility is required to maintain capacity adequate to meet its customers’ demand for electricity (“load”), including peak demand and planning and operating reserves, deliverable to the locations and at times as may be necessary to provide reliable electric service. The Utility is responsible for scheduling and bidding electric generation resources, including certain electricity procured from third parties into the wholesale market, to meet customer demand.

The following table shows the percentage of the Utility’s estimated total net deliveries of electricity to customers in 2021 represented by each major electric resource, and further discussed below. The Utility’s deliveries were primarily from renewable energy resources that qualify under California’s RPS and other GHG-free resources (i.e., nuclear, and large hydroelectric generation). California’s RPS requirements and SB 100 goal to serve 100% of retail electricity sales with GHG-free resources by 2045 are discussed further below and in the Environmental Regulation section above.

The total estimated electricity generated, procured, and sold (net), as of December 31, 2021 was 33,149 GWh (1) and comprised of the following:

| Owned Generation Facilities | Percent of Bundled Retail Sales (estimated procurement) | CEC Reporting Methodology Adjustment(2) | Percent of Bundled Retail Sales (estimated Power Content Label) (2) |
| --- | ---: | ---: | ---: |
| Renewable (3) | 2% | —% | 2% |
| Nuclear | 39% | —% | 39% |
| Large Hydroelectric | 4% | —% | 4% |
| Fossil fuel-fired (4) | 19% | (15)% | 4% |
| **Total** | **64%** | **(15)%** | **49%** |
| Third-Party Purchase Agreements |  |  |  |
| Renewable (3) | 48% | —% | 48% |
| Large Hydroelectric | —% | —% | —% |
| Fossil fuel-fired (4) | 15% | (12)% | 3% |
| **Total** | **63%** | **(12)%** | **51%** |
| Others, Net (2)(5) | **(27)%** | **27%** | **—%** |
| **TOTAL** | **100%** | **—%** | **100%** |
| **Total Renewable Energy Resources (3)** | **50%** | **—%** | **50%** |
| **GHG-Free Resources (6)** | **93%** | **—%** | **93%** |

(1) This amount excludes electricity provided by DA providers and CCAs that procure their own supplies of electricity for their respective customers.

(2) The allocation of “Others, Net” in the “CEC Reporting Methodology Reduction” and “Power Content Label” columns is consistent with CEC guidelines, applied to specified electric generation and procurement volumes (i.e., fossil fuel-fired, nuclear, large hydroelectric, and renewable). Total reported generation and procurement volumes equate to actual electric retail sales.

(3) Amounts include biopower (e.g., biogas, biomass), solar, wind, certain hydroelectric (i.e., 30MW or less), and geothermal facilities.

(4) Amounts consist primarily of natural gas facilities.

(5) Amount is mainly comprised of net CAISO open market (sales)/purchases.

(6) Amount is comprised of renewable, nuclear, and large hydroelectric facility resources generated, procured, and sold.

#### Renewable Energy Resources

California law established an RPS that requires LSEs, such as the Utility, to gradually increase the amount of renewable energy they deliver to their customers. SB 350 increased the amount of renewable energy that must be delivered by most LSEs, including the Utility, to their customers from 33% of their total annual retail sales by the end of the 2017-2020 compliance period, to 50% of their total annual retail sales by the end of the 2028- 2030 compliance period, and in each three-year compliance period thereafter, unless changed by legislative action. SB 350 provides compliance flexibility and waiver mechanisms, including increased flexibility to apply excess renewable energy procurement in one compliance period to future compliance periods. In September 2018, the California Governor signed SB 100 into law, increasing from 50% to 60% of California’s electricity portfolio that must come from renewables by 2030; and established state policy that 100% of all retail electricity sales must come from RPS-eligible or carbon-free resources by 2045. The Utility may in the future incur additional costs to procure renewable energy to meet the new renewable energy targets, which the Utility expects will continue to be recoverable through rates as “pass-through” costs. The Utility also may be subject to penalties for failure to meet the higher targets. The CPUC is required to open a new rulemaking proceeding to adopt regulations to implement the higher renewable targets.

Renewable generation resources, for purposes of the RPS requirements, include bioenergy such as biogas and biomass, certain hydroelectric facilities (30 MW or less), wind, solar, and geothermal energy. RPS requirements are based on procurement, which aligns with the methodology presented in the first column of the table above. Procurement from renewable energy sources was estimated as 50% in 2021.

The estimated total renewable deliveries as of December 31, 2021 shown above was 16,387 GWh and comprised of the following:

| Type | Percent of Bundled Retail Sales (estimated procurement)(1) (2) |
| --- | ---: |
| Biopower | 4% |
| Geothermal | 5% |
| RPS-Eligible Small Hydroelectric | 2% |
| Solar | 28% |
| Wind | 11% |
| Total | **50%** |

(1) Estimated renewable procurement amounts are expected to be consistent with Power Content Label reporting and adjustments, based on current CEC guidelines.

(2) Estimated renewable procurement percentages above and renewable compliance percentages are expected to be consistent; however, final RPS compliance reporting may result in some differences between the two percentages.

#### Energy Storage

Energy storage improves system reliability and supports California’s decarbonization goals by integrating increased levels of renewable energy. The CPUC has established a multi-year energy storage procurement framework, under which the Utility was required to procure 580 MW of qualifying storage capacity by the end of 2020, with all energy storage projects required to be operational by the end of 2024. As of December 31, 2021, the Utility was on track to meet its storage goals by the end of 2024.

Additionally, the Utility has been actively procuring energy storage to meet critical reliability needs. The CPUC previously approved more than 1,100 MW of storage to come online in 2022 and 2023. In January 2022, the Utility also requested CPUC approval for another 1,600 MW of storage to be completed by the summer of 2024, which would bring the Utility’s total energy storage system capacity to more than 3,330 MW. Finally, the Utility expects to solicit 200 MW of long-duration storage, which is storage with at least eight hours of discharge capacity, in 2022 to have these resources online between 2026 and 2028.

#### Owned Generation Facilities

At December 31, 2021, the Utility owned the following generation facilities, all located in California, listed by energy source and further described below:

| Generation Type Nuclear (1): | County Location | Number of Units | Net Operating Capacity (MW) |
| --- | --- | ---: | ---: |
| Diablo Canyon | San Luis Obispo | 2 | 2,240 |
| Hydroelectric (2): |  |  |  |
| Conventional | 16 counties in northern and central California | 100 | 2,648 |
| Helms pumped storage | Fresno | 3 | 1,212 |
| Fossil fuel-fired: |  |  |  |
| Colusa Generating Station | Colusa | 1 | 657 |
| Gateway Generating Station | Contra Costa | 1 | 580 |
| Humboldt Bay Generating Station | Humboldt | 10 | 163 |
| Photovoltaic (3): | Various | 13 | 152 |
| **Total** |  | **130** | **7,652** |

(1) The Utility’s Diablo Canyon power plant consists of two nuclear power reactor units, Units 1 and 2. The NRC operating licenses expire in 2024 and 2025, respectively. On January 11, 2018, the CPUC approved the Utility’s application to retire Unit 1 by 2024 and Unit 2 by 2025.

(2) The Utility’s hydroelectric system consists of 103 generating units at 64 powerhouses. All of the Utility’s powerhouses are licensed by the FERC (except for two small powerhouses not subject to the FERC’s licensing requirements), with license terms between 30 and 50 years.

(3) The Utility’s large photovoltaic facilities are Cantua solar station (20 MW), Five Points solar station (15 MW), Gates solar station (20 MW), Giffen solar station (10 MW), Guernsey solar station (20 MW), Huron solar station (20 MW ), Stroud solar station (20 MW), West Gates solar station (10 MW), and Westside solar station (15 MW). All of these facilities are located in Fresno County, except for Guernsey solar station, which is located in Kings County.

#### Generation Resources from Third Parties

The Utility has entered into various agreements to purchase power and electric capacity, including agreements for renewable energy resources, in accordance with its CPUC-approved procurement plan. See “Ratemaking Mechanisms” above. For more information regarding the Utility’s power purchase agreements, see Note 15 of the Notes to the Consolidated Financial Statements in Item 8.

### Electricity Transmission

At December 31, 2021, the Utility owned approximately 18,000 circuit miles of interconnected transmission lines operating at voltages ranging from 60 kV to 500 kV. The Utility also operated 33 electric transmission substations with a capacity of approximately 70,000 MVA. The Utility’s electric transmission system is interconnected with electric power systems in the Western Electricity Coordinating Council, which includes many western states, the Canadian provinces of Alberta and British Columbia, and parts of Mexico.

Decisions about expansions and maintenance of the transmission system can be influenced by decisions of the Utility’s regulators and the CAISO.

### Electricity Distribution

The Utility’s electric distribution network consists of approximately 108,000 circuit miles of distribution lines (of which, as of December 31, 2021, approximately 25% are underground and approximately 75% are overhead), 67 transmission switching substations, and 753 distribution substations with a capacity of approximately 35,000 MVA. The Utility’s distribution network interconnects with its transmission system, primarily at switching and distribution substations, where equipment reduces the high-voltage transmission voltages to lower voltages, ranging from 44 kV to 2.4 kV, suitable for distribution to the Utility’s customers.

These distribution substations serve as the central hubs for the Utility’s electric distribution network. Emanating from each substation are primary and secondary distribution lines connected to local transformers and switching equipment that link distribution lines and provide delivery to end-users. In some cases, the Utility sells electricity from its distribution facilities to entities, such as municipal and other utilities, that resell the electricity. The Utility operates electric distribution control center facilities in Concord, Rocklin, and Fresno, California; these control centers form a key part of the Utility’s efforts to create a smarter, more resilient grid.

### Electricity Operating Statistics

The following table shows certain of the Utility’s operating statistics from 2019 to 2021 for electricity sold or delivered, including the classification of revenues by type of service. No single customer of the Utility accounted for 10% or more of consolidated revenues for electricity sold in 2021, 2020 or 2019.

|  | 2021 | 2020 | 2019 |
| --- | ---: | ---: | ---: |
| Customers (average for the year) | 5,539,969 | 5,498,044 | 5,457,101 |
| Deliveries (in GWh) (1) | 78,588 | 78,497 | 78,070 |
| Revenues (in millions): |  |  |  |
| Residential | $6,089 | $5,523 | $4,847 |
| Commercial | 5,042 | 4,722 | 4,756 |
| Industrial | 1,493 | 1,530 | 1,493 |
| Agricultural | 1,565 | 1,471 | 1,106 |
| Public street and highway lighting | 73 | 69 | 67 |
| Other (2) | (84) | (130) | 168 |
| Subtotal | 14,178 | 13,185 | 12,437 |
| Regulatory balancing accounts (3) | 953 | 673 | 303 |
| **Total operating revenues** | **$15,131** | **$13,858** | **$12,740** |
| Selected Statistics: |  |  |  |
| Average annual residential usage (kWh) | 5,889 | 6,179 | 5,750 |
| Average billed revenues per kWh: |  |  |  |
| Residential | $0.2125 | $0.1852 | $0.1762 |
| Commercial | 0.1802 | 0.1730 | 0.1585 |
| Industrial | 0.1075 | 0.1085 | 0.1015 |
| Agricultural | 0.2104 | 0.2210 | 0.2172 |
| Net plant investment per customer | $9,199 | $8,889 | $8,375 |

(1) These amounts include electricity provided by DA providers and CCAs that procure their own supplies of electricity for their respective customers.

(2) This activity is primarily related to provisions for rate refunds and unbilled electric revenue, partially offset by other miscellaneous revenue items.

(3) These amounts represent revenues authorized to be billed.

### Natural Gas Utility Operations

The Utility provides natural gas transportation services to “core” customers (i.e., small commercial and residential customers) and to “non-core” customers (i.e., industrial, large commercial, and natural gas-fired electric generation facilities) that are connected to the Utility’s gas system in its service territory. Core customers can purchase natural gas procurement service (i.e., natural gas supply) from either the Utility or non-utility third-party gas procurement service providers (referred to as “core transport agents”). When core customers purchase gas supply from a core transport agent, the Utility continues to provide gas delivery, metering and billing services to customers. When the Utility provides both transportation and procurement services, the Utility refers to the combined service as “bundled” natural gas service. Currently, more than 96% of core customers, representing approximately 85% of the annual core market demand, receive bundled natural gas service from the Utility.

The Utility generally does not provide procurement service to non-core customers, which must purchase their gas supplies from third-party suppliers, unless the customer is a natural gas-fired generation facility with which the Utility has a power purchase agreement that includes its generation fuel expense. The Utility offers backbone gas transmission, gas delivery (local transmission and distribution), and gas storage services as separate and distinct services to its non-core customers. Access to the Utility’s backbone gas transmission system is available for all natural gas marketers and shippers, as well as non-core customers. The Utility also delivers gas to off-system customers (i.e., outside of the Utility’s service territory) and to third-party natural gas storage customers.

### Natural Gas Supplies

The Utility can receive natural gas from all the major natural gas basins in western North America, including basins in western Canada, the Rocky Mountains, and the southwestern United States. The Utility can also receive natural gas from fields in California. The Utility purchases natural gas to serve its core customers directly from producers and marketers in both Canada and the United States. The contract lengths and natural gas sources of the Utility’s portfolio of natural gas purchase contracts have varied generally based on market conditions. During 2021, the Utility purchased approximately 302,000 MMcf of natural gas (net of the sale of excess supply of gas). Substantially all of this natural gas was purchased under contracts with a term of one year or less. The Utility’s largest individual supplier represented approximately 43% of the total natural gas volume the Utility purchased during 2021.

### Natural Gas System Assets

The Utility owns and operates an integrated natural gas transmission, storage, and distribution system that includes most of northern and central California. At December 31, 2021, the Utility’s natural gas system consisted of approximately 43,800 miles of distribution pipelines, over 6,200 miles of backbone and local transmission pipelines, and various storage facilities. The Utility owns and operates eight natural gas compressor stations on its backbone transmission system and one small station on its local transmission system that are used to move gas through the Utility’s pipelines. The Utility’s backbone transmission system, composed primarily of Lines 300, 400, and 401, is used to transport gas from the Utility’s interconnection with interstate pipelines, other local distribution companies, and California gas fields to the Utility’s local transmission and distribution systems.

The Utility has firm transportation agreements for delivery of natural gas from western Canada to the United States-Canada border with TransCanada NOVA Gas Transmission, Ltd. interconnecting downstream with TransCanada Foothills Pipe Lines Ltd., B.C. System. The Foothills system interconnects at the border to the pipeline system owned by Gas Transmission Northwest, LLC, which provides natural gas transportation services to a point of interconnection with the Utility’s natural gas transportation system on the Oregon-California border near Malin, Oregon. The Utility also has firm transportation agreements with Ruby Pipeline, LLC to transport natural gas from the U.S. Rocky Mountains to the interconnection point with the Utility’s natural gas transportation system in the area of Malin, Oregon, at the California border. Similarly, the Utility has a firm transportation agreement with Transwestern Pipeline Company, LLC to transport natural gas from supply points in the southwestern United States to interconnection points with the Utility’s natural gas transportation system in the area of California near Topock, Arizona. (For more information regarding the Utility’s natural gas transportation agreements, see Note 15 of the Notes to the Consolidated Financial Statements in Item 8.)

The Utility owns and operates three underground natural gas storage fields and has a 25% interest in a fourth storage field, all of which are connected to the Utility’s gas transmission system. In 2019, the CPUC approved the discontinuation, through closure or sale, of operations at two of the Utility’s owned and operated gas storage fields, Pleasant Creek and Los Medanos. The Utility expects to sell Pleasant Creek in 2022 in accordance with the CPUC’s final decision in the 2019 GT&S rate case. The Utility intends to retain the Los Medanos field to further support system supply reliability as proposed in the 2023 GRC. The Utility owns and operates compressors and other facilities at these storage fields that are used to inject gas into the fields for storage and later for withdrawal. In addition, four independent storage operators are interconnected to the Utility’s Northern California gas transmission system.

In 2021, the Utility continued upgrading transmission pipeline to allow for the use of in-line inspection tools and continued its work on the final recommendation from the NTSB’s 2010-11 San Bruno investigation to hydrostatically test all high consequence pipeline mileage. The Utility currently plans to complete this NTSB recommendation by 2022 for remaining short pipeline segments that include tie-in pieces, fittings or smaller diameter off-takes from the larger transmission pipelines.

### Natural Gas Operating Statistics

The following table shows the Utility’s operating statistics from 2019 through 2021 (excluding subsidiaries) for natural gas, including the classification of revenues by type of service. No single customer of the Utility accounted for 10% or more of consolidated revenues for bundled gas sales in 2021, 2020 or 2019.

|  | 2021 | 2020 | 2019 |
| --- | ---: | ---: | ---: |
| Customers (average for the year) (1) | 4,563,747 | 4,545,700 | 4,518,209 |
| Gas purchased (MMcf) | 226,037 | 226,746 | 227,621 |
| Average price of natural gas purchased | $3.19 | $2.02 | $2.08 |
| Bundled gas sales (MMcf): |  |  |  |
| Residential | 162,205 | 162,682 | 162,876 |
| Commercial | 54,262 | 49,834 | 54,479 |
| **Total Bundled Gas Sales** | **216,467** | **212,516** | **217,355** |
| Revenues (in millions): |  |  |  |
| Bundled gas sales: |  |  |  |
| Residential | $2,759 | $2,517 | $2,325 |
| Commercial | 713 | 597 | 605 |
| Other | 140 | 61 | 123 |
| Bundled gas revenues | 3,612 | 3,175 | 3,053 |
| Transportation service only revenue | 1,346 | 1,211 | 1,249 |
| Subtotal | 4,958 | 4,386 | 4,302 |
| Regulatory balancing accounts (2) | 553 | 225 | 87 |
| **Total operating revenues** | **$5,511** | **$4,611** | **$4,389** |
| Selected Statistics: |  |  |  |
| Average annual residential usage (Mcf) | 37 | 37 | 38 |
| Average billed bundled gas sales revenues per Mcf: |  |  |  |
| Residential | $16.54 | $15.09 | $13.88 |
| Commercial | 11.63 | 10.61 | 9.72 |
| Net plant investment per customer | $4,130 | $3,794 | $3,522 |

(1) These amounts include natural gas provided by core transport agents and CCAs that procure their own supplies of natural gas for their respective customers.

(2) These amounts represent revenues authorized to be billed.

### Competition

### Trends in Market Demand and Competitive Conditions in the Electricity Industry

California law allows qualifying non-residential electric customers of IOUs to purchase electricity from energy service providers rather than from the utilities up to certain annual limits specified for each utility. This arrangement is known as DA. In 2018, the California legislature passed a bill to expand the annual statewide DA cap by 4,000 GWh and directed the CPUC to consider whether DA should be further expanded. In addition, California law permits cities, counties, and certain other public agencies that have qualified to become a CCA to generate or purchase electricity for their local residents and businesses. By law, a CCA can procure electricity for all of its residents and businesses that do not affirmatively elect to continue to receive electricity generated or procured by a utility. In 2019, the CPUC issued an order implementing the 4,000 GWh increase for DA transactions, including an apportionment to the Utility’s service area of approximately 1,873 GWh.

On June 24, 2021, the CPUC adopted a decision further implementing the 2018 legislation. In that decision, the CPUC recommended against further legislative expansion of DA at this time. Although a CPUC staff report issued in September 2020 had recommended expanding DA at a rate of ten percent each year, the CPUC ultimately found that recent reliability events and the current integrated resource planning forecasted needs for additional generation prevented a need for further DA reopening. The CPUC found that expanded DA would result in further fragmentation of the electric market in California and raise electric system reliability concerns. Additionally, the CPUC based its recommendation in part on DA providers’ primary reliance on unspecified power sources, which it found may not support California’s climate goals.

The Utility continues to provide transmission, distribution, metering, and billing services to DA customers at the election of their energy service provider. The CCA customers continue to obtain transmission, distribution, metering, and billing services from the Utility. In addition to collecting charges for transmission, distribution, metering, and billing services that it provides, the Utility is able to collect charges intended to recover the generation-related costs that the Utility incurred on behalf of DA and CCA customers while they were the Utility’s customers. The Utility remains the electricity provider of last resort for these customers. Section 387 of the Public Utilities Code allows for a request to transfer the responsibilities of the provider of last resort obligation from IOUs to other entities.

The Utility is also impacted by the increasing viability of distributed generation and energy storage. The levels of self-generation of electricity by customers (primarily solar installations) and the use of customer NEM, which allows self-generating customers employing qualifying renewable resources to receive bill credits at the full retail rate, are increasing, putting upward rate pressure on remaining customers. New NEM customers are required to pay an interconnection fee, utilize time of use rates, and are required to pay certain non-bypassable charges to help fund some of the costs of low income, energy efficiency, and other programs that other customers pay. Significantly higher bills for remaining customers may result in a decline of the number of such customers as they may seek alternative energy providers or adopt self-generation technologies. See “Rising rates for the Utility’s customers could result in circumstances in which the Utility is unable to fully recover costs or earn its authorized ROE” in Item 1A. Risk Factors and “Regulatory Matters-OIR to Revisit Net Energy Metering Tariffs” in Item 7. MD&A.

Further, in some circumstances, governmental entities such as cities and irrigation districts may have authority under the state constitution or state statute to provide retail electric service directly to consumers. Those entities may rely upon FERC open access tariffs and Utility infrastructure to deliver energy to them at wholesale rates for resale at retail to existing or potential new Utility customers. These entities may also seek to acquire the Utility’s transmission or distribution facilities through eminent domain for use in serving electricity at retail to existing or potential new Utility customers. During the Chapter 11 Cases, multiple entities communicated their interest in acquiring Utility assets through voluntary sales. It is also expected that some publicly-owned utilities will construct duplicate or new transmission or distribution facilities to serve existing or potential new Utility customers. In some instances, microgrid formation is a key factor in a community’s choice to engage governmental entities.

The Utility also competes for the opportunity to develop and construct certain types of electric transmission facilities within, or interconnected to, its service territory through a competitive bidding process managed by the CAISO.

The effect of such types of retail competition generally is to reduce the number of utility customers, leading to a reduction in the Utility’s rate base.

For risks in connection with increasing competition, see Item 1A. Risk Factors.

### Competition in the Natural Gas Industry

The Utility competes with other natural gas pipeline companies for customers transporting natural gas into the southern California market on the basis of transportation rates, access to competitively priced supplies of natural gas, and the quality and reliability of transportation services. The Utility also competes for storage services with other third-party storage providers, primarily in Northern California.

## Risk factors

As filed, 95,209 characters.

PG&E Corporation’s and the Utility’s financial results can be affected by many factors, including estimates and assumptions used in the critical accounting estimates described in Item 7. MD&A, that can cause their actual financial results to differ materially from historical results or from anticipated future financial results. The following discussion of key risk factors should be considered in evaluating an investment in PG&E Corporation and the Utility and should be read in conjunction with Item 7. MD&A and the Consolidated Financial Statements and related notes in Part II, Item 8, “Financial Statements and Supplementary Data” of this 2021 Form 10-K. Any of these factors, in whole or in part, could materially affect PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows.

### Risk Factors Summary

The following is a summary of the principal risks that could adversely affect our business, operations, and financial results. These risks are discussed more fully below.

### Risks related to wildfires, including risks related to:

- The extent to which the Wildfire Fund and revised recoverability standard under AB 1054 effectively mitigates the risk of liability for damages arising from catastrophic wildfires;
- The 2019 Kincade fire, the 2020 Zogg fire, the 2021 Dixie fire or future wildfires;
- Recovery of excess costs in connection with wildfires; and
- Implementation of wildfire mitigation initiatives.

### Risks related to operations and information technology, including risks related to:

- The hazardous nature of the Utility’s electricity and natural gas operations;
- The Utility’s insurance coverage;
- Changes in the electric power and gas industries;
- A cyber incident, cyber security breach, severe natural event or physical attack; and
- The operation and decommissioning of the Utility’s nuclear generation facilities.

### Risks related to environmental factors, including risks related to:

- Severe weather conditions, extended drought and climate change and events resulting from these conditions (including wildfires); and
- Extensive environmental laws.

### Risks related to enforcement matters, investigations, and regulatory proceedings, including risks related to:

- The Enhanced Oversight and Enforcement Process;
- Legislative and regulatory developments;
- Outcomes of enforcement proceedings in connection with extensive regulations to which the Utility is subject; and
- Outcomes of regulatory and ratemaking proceedings and the Utility’s ability to manage its costs.

### Risks related to the environment and financial condition, including risks related to:

- PG&E Corporation’s and the Utility’s substantial indebtedness;
- Restrictions in indebtedness documents;
- Appeals of the Confirmation Order;
- Potential additional dilution to holders of PG&E Corporation common stock;
- Any substantial sale of stock by existing stockholders;
- Ownership and transfer restrictions associated with PG&E Corporation common stock;
- Tax-related risks and uncertainties, including the grantor trust election for the Fire Victim Trust;
- Restrictions on PG&E Corporation’s and the Utility’s ability to issue dividends;
- PG&E Corporation’s reliance on dividends, distributions and other payments from the Utility;
- Restrictions on shareholders ability to change the direction or management of PG&E Corporation;
- The COVID-19 pandemic; and
- Increased customer rates.

### General risks, including related to:

- Attracting and maintaining a qualified workforce or prolonged labor disruptions.

### Risks Related to Wildfires

***The Wildfire Fund and other provisions of AB 1054 may not effectively mitigate the risk of liability for damages arising from catastrophic wildfires.***

If the Utility does not have an approved WMP, the Utility will not be issued a safety certification and will consequently not benefit from the presumption of prudency or the AB 1054 disallowance cap. Under AB 1054, the Utility is required to maintain a safety certification issued by the OEIS to be eligible for certain benefits, including a cap on Wildfire Fund reimbursement and a reformed prudent manager standard. The AB 1054 Wildfire Fund disallowance cap, which caps the amount of liability that the Utility could be required to bear for a catastrophic wildfire, is inapplicable if the Wildfire Fund administrator determines that the electric utility company’s actions or inactions that resulted in the applicable wildfire constituted “conscious or willful disregard for the rights and safety of others,” or the electric utility company fails to maintain a valid safety certification at the time the applicable wildfire ignited. In addition, if the Utility fails to maintain a valid safety certificate at the time a wildfire ignites, the initial burden of proof in a prudency proceeding shifts from intervenors to the Utility. The Utility will be required to reimburse amounts that are determined by the CPUC not to be just and reasonable. For more information on the disallowance cap, see Note 14 of the Notes to the Consolidated Financial Statements in Item 8.

Furthermore, the Wildfire Fund will only be available for payment of eligible claims so long as there are sufficient funds remaining in the Wildfire Fund. Such funds could be depleted more quickly than expected, including as a result of claims made by California’s other participating electric utility companies. If the Utility is unable to maintain an AB 1054 safety certification or if the Wildfire Fund is exhausted, the ineffectiveness of the Wildfire Fund could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. Also, the Utility will not be able to obtain any recovery from the Wildfire Fund for wildfire-related losses in any year that do not exceed the greater of $1.0 billion in the aggregate and the amount of insurance coverage required under AB 1054.

The costs of participating in the Wildfire Fund are expected to exceed $6.7 billion over the anticipated ten-year contribution period for the fund. The timing and amount of any potential charges associated with the Utility’s contributions would also depend on various factors. In addition, there could also be a significant delay between the occurrence of a wildfire and the timing on which the Utility recognizes impairment for the reduction in future coverage, due to the lack of data available to the Utility following a catastrophic event, especially if the wildfire occurs in the service territory of another participating electric utility. Participation in the Wildfire Fund is expected to have a material impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows, and there can be no assurance that the benefits of participating in the Wildfire Fund ultimately outweigh these substantial costs.

***PG&E Corporation and the Utility could be liable as a result of the 2019 Kincade fire, the 2020 Zogg fire, the 2021 Dixie fire, or future wildfires.***

Based on the facts and circumstances available as of the date of this report, PG&E Corporation and the Utility have determined that it is probable they will incur losses in connection with the 2019 Kincade fire, the 2020 Zogg fire and the 2021 Dixie fire. Although PG&E Corporation and the Utility have recorded liabilities for probable losses in connection with these fires, these liability estimates correspond to the lower end of the range of reasonably estimable losses, do not include several categories of potential damages that are not reasonably estimable, and are subject to change based on new information.

Although there are a number of unknown facts surrounding Cal Fire’s causation determinations of the 2019 Kincade fire, the 2020 Zogg fire, and the 2021 Dixie fire, the Utility could be subject to significant liability in excess of recoveries that would be expected to have a material impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. PG&E Corporation and the Utility have also received and have responded or are responding to document, data, and other information requests from the CPUC’s SED and law enforcement agencies that are investigating these wildfires. PG&E Corporation and the Utility could be the subject of additional investigations, lawsuits, or enforcement actions in connection with the 2019 Kincade fire, the 2020 Zogg fire, the 2021 Dixie fire or other wildfires. For more information, see Note 14 of the Notes to the Consolidated Financial Statements in Item 8.

Under California law (including Penal Code section 1202.4), if the Utility were convicted of any of the charges in the Kincade Amended Complaint or the Zogg Complaint, the sentencing court must order the Utility to “make restitution to the victim or victims in an amount established by court order” that is “sufficient to fully reimburse the victim or victims for every determined economic loss incurred as the result of” the Utility’s underlying conduct, in addition to interest and the victim’s or victims’ attorneys’ fees. This requirement for full reimbursement of economic loss is not waivable by either the government or the victims and is not offset by any compensation that the victims have received or may receive from their insurance carriers. In the event that the Utility were convicted of certain charges in the Kincade Amended Complaint or the Zogg Complaint, the Utility currently believes that, depending on which charges it were to be convicted of, its total losses associated with each of the Kincade Amended Complaint and the Zogg Complaint would materially exceed the $800 million and the $375 million aggregate liability that PG&E Corporation and the Utility have recorded to reflect the lower end of the range of the reasonably estimable range of losses for the 2019 Kincade fire and 2020 Zogg fire civil claims, respectively. The Utility is currently unable to determine a reasonable estimate of the amount of such additional losses. The Utility does not expect that any of its liability insurance would be available to cover restitution payments ordered by the court presiding over the criminal proceeding.

There have also been numerous other wildfires in the Utility’s service territory, of which the Utility has not been alleged or determined to be a cause. The Utility could be alleged or determined to be a cause of one or more of these wildfires.

Additionally, under the doctrine of inverse condemnation, courts have imposed liability against utilities on the grounds that losses borne by the person whose property was damaged through a public-use undertaking should be spread across the community that benefited from such undertaking, even if the utility is unable to recover these costs through rates. In fact, in December 2017, the CPUC denied recovery of costs that San Diego Gas & Electric Company stated it had incurred as a result of the doctrine of inverse condemnation. Legal challenges to that denial were unsuccessful. Plaintiffs have asserted and continue to assert the doctrine of inverse condemnation in lawsuits related to certain wildfires that occurred in the Utility’s service territory. Inverse condemnation imposes strict liability (including liability for attorneys’ fees) for damages as a result of the design, construction and maintenance of utility facilities, including utilities’ electric transmission lines. While the Utility currently continues to dispute the applicability of inverse condemnation to the Utility, there can be no assurance that the Utility will be successful in challenging the applicability of inverse condemnation in the 2019 Kincade fire, the 2020 Zogg fire, the 2021 Dixie fire, or other litigation against PG&E Corporation or the Utility.

Although the Utility has taken extensive measures to reduce the threat of future wildfires, the potential that the Utility’s equipment will be involved in the ignition of future wildfires, including catastrophic wildfires, is significant. This risk may be attributable to, and exacerbated by, a variety of factors, including climate (in particular extended periods of seasonal dryness coupled with periods of high wind velocities and other storms), infrastructure, and vegetation conditions. Despite significant investment in mitigation measures to improve infrastructure and manage vegetation, as well as implementation of de-energization strategies, the Utility may not be successful in mitigating the risk of future wildfires.

In addition, wildfires have had and, along with any future wildfires, could continue to have, adverse consequences on the Utility’s proceedings with the CPUC (including the Safety Culture OII) and the FERC, and future regulatory proceedings, including future applications with the OEIS for the safety certification required by AB 1054. PG&E Corporation and the Utility may also suffer additional reputational harm and face an even more challenging operating, political, and regulatory environment as a result of the 2019 Kincade fire, the 2020 Zogg fire, the 2021 Dixie fire or any future wildfires. For more information about the 2019 Kincade fire, the 2020 Zogg fire, and the 2021 Dixie fire, see Note 14 of the Notes to the Consolidated Financial Statements in Item 8.

***The Utility may be unable to recover all or a significant portion of its excess costs in connection with wildfires from insurance, through rates, or from the Wildfire Fund in a timely manner.***

The Utility could incur substantial costs in excess of insurance coverage or amounts potentially available under the Wildfire Fund under AB 1054 in the future in connection with the 2019 Kincade fire, the 2020 Zogg fire and the 2021 Dixie fire. There can be no assurance that the Utility will be allowed to recover costs in excess of insurance or amounts potentially available under the Wildfire Fund under AB 1054 in the future either through FERC TO rates or as costs recorded to the WEMA, even if a court decision were to determine that the Utility is liable as a result of the application of the doctrine of inverse condemnation. The inability to recover all or a significant portion of costs in excess of insurance through rates or by collecting such rates in a timely manner could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. For more information on wildfire recovery risk, see “The Wildfire Fund and other provisions of AB 1054 may not effectively mitigate the risk of liability for damages arising from catastrophic wildfires” above, “The Utility’s insurance coverage may not be sufficient to cover losses caused by an operating failure or catastrophic events, including severe weather events and events resulting from these conditions (including wildfires), or may not be available at a reasonable cost, or available at all” below, and Note 14 of the Notes to the Consolidated Financial Statements in Item 8.

### The Utility may not effectively implement its wildfire mitigation initiatives.

The Utility’s infrastructure is aging and poses risks to safety and system reliability. Although the Utility spends significant resources on initiatives designed to mitigate wildfire risks, there is no assurance that these initiatives will be successful or effective in reducing wildfire-related losses or that their costs will be fully recoverable through rates. The Utility will face a higher likelihood of catastrophic wildfires in its service territory if it cannot effectively implement these efforts and its WMPs. For example, the Utility may not be able to effectively implement its WMPs if it experiences unanticipated difficulties relative to sourcing, engaging, training, overseeing and retaining contract workers it needs to fulfill its mitigation obligations under the WMPs. The CPUC may assess penalties on the Utility if it finds that the Utility has failed to substantially comply with its WMPs.

There can be no assurance that the Utility’s wildfire mitigation initiatives will be effective. For instance, a wildfire may be ignited and spread even in conditions that do not trigger proactive de-energization according to criteria for initiating a PSPS event. The Utility’s inspections of vegetation near its assets may not detect structural weaknesses within a tree or other issues. If the Utility’s wildfire mitigation initiatives are not effective, a wildfire could be ignited and spread.

The PSPS program has been subject to significant scrutiny and criticism by various stakeholders, including customers, regulators, and lawmakers. The Utility also is the subject of a class action litigation in connection with the 2019 PSPS events.

In addition, on a risk-informed basis, the Utility is making efforts to reduce the frequency and impacts of PSPS. The Utility may be subject to mandated changes to, or restrictions on, its operational practices, regulatory fines and penalties, claims for damages, and reputational harm if the Utility does not execute PSPS in compliance with applicable rules and regulations. The Utility establishes the criteria under which it implements PSPS in its territory. To the extent the Utility’s criteria for implementing PSPS are not sufficient to mitigate the risk of wildfires, the Utility does not fully implement PSPS when criteria are met due to other overriding conditions or the Utility’s regulators mandate changes to, or restrictions on, its criteria or other operational PSPS practices, the Utility will face a higher likelihood of catastrophic wildfires in its territory during high-risk weather conditions.

PG&E Corporation and the Utility cannot predict the timing and outcome of the various proceedings and litigation in connection with its wildfire mitigation initiatives. PG&E Corporation and the Utility could be subject to additional investigations, regulatory proceedings or other enforcement actions as well as to additional litigation and claims by customers as a result of the Utility’s implementation of its wildfire mitigation initiatives, which could result in fines, penalties, customer rebates or other payments. The amount of any fines, penalties, customer rebates or other payments (if PG&E Corporation or the Utility were to issue any credits, rebates or other payments in connection with any other wildfire mitigation initiatives or liability for damages) could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. In addition, the PSPS and EPSS programs have had an adverse impact on PG&E Corporation’s and the Utility’s reputation with customers, regulators and policymakers and future PSPS and EPSS events may increase these negative perceptions. For more information, see “Regulatory Matters” in Item 7. MD&A.

### Risks Related to Operations and Information Technology

***The Utility’s electricity and natural gas operations are inherently hazardous and involve significant risks.***

The Utility owns and operates extensive electricity and natural gas facilities, including two nuclear generation units and an extensive hydroelectric generating system. See “Electric Utility Operations” and “Natural Gas Utility Operations” in Item 1. above. The Utility undertakes substantial capital investment projects to construct, replace, and improve its electricity and natural gas facilities. In addition, the Utility is obligated to decommission its electricity generation facilities at the end of their useful operating lives, and the CPUC approved retirement of Diablo Canyon by 2024 and 2025. For more information, see “The operation and decommissioning of the Utility’s nuclear generation facilities expose it to potentially significant liabilities and the Utility may not be able to fully recover its costs if regulatory requirements or operating conditions change or the facilities cease operations before the licenses expire” below.

The Utility’s ability to efficiently construct, maintain, operate, protect, and decommission its facilities, and provide electricity and natural gas services safely and reliably is subject to numerous risks, many of which are beyond the Utility’s control, including those that arise from:

- the breakdown or failure of equipment, electric transmission or distribution lines, or natural gas transmission and distribution pipelines or other assets or group of assets, that can cause explosions, fires, public or workforce safety issues, large scale system disruption or other catastrophic events;
- an overpressure event occurring on natural gas facilities due to equipment failure, incorrect operating procedures or failure to follow correct operating procedures, or welding or fabrication-related defects, that results in the failure of downstream transmission pipelines or distribution assets and uncontained natural gas flow;
- the failure to maintain adequate capacity to meet customer demand on the gas system that results in customer curtailments, controlled/uncontrolled gas outages, gas surges back into homes, serious personal injury or loss of life;
- a prolonged statewide electrical black-out that results in damage to the Utility’s equipment or damage to property owned by customers or other third parties;
- the failure to fully identify, evaluate, and control workplace hazards that result in serious injury or loss of life for employees, contractors, or the public, environmental damage, or reputational damage;
- the release of radioactive materials caused by a nuclear accident, seismic activity, natural disaster, or terrorist act;
- the failure of a large dam or other major hydroelectric facility, or the failure of one or more levees that protect land on which the Utility’s assets are built;
- the failure to take expeditious or sufficient action to mitigate operating conditions, facilities, or equipment, that the Utility has identified, or reasonably should have identified, as unsafe, which failure then leads to a catastrophic event (such as a wildfire or natural gas explosion);
- inadequate emergency preparedness plans and the failure to respond effectively to a catastrophic event that can lead to public or employee harm or extended outages;
- operator or other human error;
- a motor vehicle or aviation incident involving a Utility vehicle or aircraft, respectively (or one operated on behalf of the Utility) resulting in serious injuries to or fatalities of the workforce or the public, property damage, or other consequences;
- an ineffective records management program that results in the failure to construct, operate and maintain a utility system safely and prudently;
- construction performed by third parties that damages the Utility’s underground or overhead facilities, including, for example, ground excavations or “dig-ins” that damage the Utility’s underground pipelines, the risk of which may be exacerbated if the Utility does not have an effective contract management system;
- the release of hazardous or toxic substances into the air, water, or soil, including, for example, gas leaks from natural gas storage facilities; flaking lead-based paint from the Utility’s facilities, and leaking or spilled insulating fluid from electrical equipment; and
- attacks by third parties, including cyber-attacks, acts of terrorism, vandalism, or war. For more information, see “The Utility’s operational networks and information technology systems could be impacted by a cyber incident, cyber security breach, severe natural event or physical attack” below.

The occurrence of any of these events could interrupt fuel supplies, affect demand for electricity or natural gas, cause unplanned outages or reduce generating output, damage the Utility’s assets or operations, damage the assets or operations of third parties on which the Utility relies, damage property owned by customers or others, and cause personal injury or death. As a result, the Utility could incur costs to purchase replacement power, to repair assets and restore service, and to compensate third parties. Any of such incidents also could lead to significant claims against the Utility.

Further, although the Utility often enters into agreements for third-party contractors to perform work, such as patrolling and inspection of facilities, vegetation management, or the construction or demolition or facilities, the Utility may have less control over contractors than its employees and may retain liability for the quality and completion of the contractor’s work and can be subject to penalties or other enforcement action if the contractor violates applicable laws, rules, regulations, or orders. The Utility may also be subject to liability, penalties or other enforcement action as a result of personal injury or death caused by third-party contractor actions.

Insurance, equipment warranties, or other contractual indemnification requirements may not be sufficient or effective to provide full or even partial recovery under all circumstances or against all hazards or liabilities to which the Utility may become subject. An uninsured loss could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows.

***The Utility’s insurance coverage may not be sufficient to cover losses caused by an operating failure or catastrophic events, including severe weather events and events resulting from these conditions (including wildfires), or may not be available at a reasonable cost, or available at all.***

As a result of the potential application to IOUs of a strict liability standard under the doctrine of inverse condemnation, past losses recorded by insurance companies, past wildfires and the risk of increased wildfires including as a result of climate change, the Utility may not be able to obtain sufficient insurance coverage in the future at a reasonable cost, or at all.

The Utility has experienced increased costs and difficulties in obtaining insurance coverage for wildfires and other risks that could arise from the Utility’s ordinary operations. PG&E Corporation, the Utility or its contractors and customers could continue to experience coverage reductions or increased insurance costs in future years. No assurance can be given that future losses will not exceed the limits of the Utility’s insurance coverage, including losses arising from litigation. Uninsured losses and increases in the cost of insurance may not be recoverable through rates. A loss that is not fully insured or cannot be recovered through rates, and increased insurance costs that are not recoverable, could materially affect PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows.

***The electric power and gas industries are undergoing significant changes driven by technological advancements and a decarbonized economy.***

The electric power industry is undergoing transformative change driven by technological advancements enabling customer choice and state climate policy supporting a decarbonized economy. California utilities also are experiencing increasing deployment by customers and third parties of distributed energy resources, such as on-site solar generation, energy storage, fuel cells, energy efficiency, and demand response technologies. These developments will require modernization of the electric distribution grid to, among other things, accommodate two-way flows of electricity, increase the grid’s capacity, and interconnect distributed energy resources. In order to enable the California clean energy economy, sustained investments are required in grid modernization, renewable integration projects, energy efficiency programs, energy storage options, EV infrastructure and state infrastructure modernization (e.g., rail and water projects). If the Utility is unable to effectively adapt to these changes, its business model and its ability to execute on its strategy could be materially impacted.

Various jurisdictions within California have enacted prohibitions or restrictions on use and consumption of natural gas, for example in buildings, that will reduce the use of natural gas. Reducing natural gas use could lead to a reduction in the gas customer base and a diminished need for gas infrastructure and, as a result, could lead to certain gas assets no longer being “used and useful,” potentially causing substantial investment value of gas assets to be stranded (under CPUC precedent, when an asset no longer meets the standard of “used and useful,” the asset is removed from rate base, which results in a reduction in associated rate recovery). However, while natural gas demand is projected to decline over time, the costs of operating a safe and reliable gas delivery system in California have been increasing, among other things, to cover the cost of long-term pipeline safety enhancements. Inability by the Utility to recover through rates its investments into the natural gas system while still ensuring gas system safety and reliability could materially affect the Utility’s financial condition, results of operations, liquidity, and cash flows.

These industry changes, costs associated with complying with new regulatory developments and initiatives and with technological advancements, or the Utility’s inability to successfully adapt to changes in the electric and gas industry, could materially affect the Utility’s financial condition, results of operations, liquidity, and cash flows.

***The Utility’s operational networks and information technology systems could be impacted by a cyber incident, cyber security breach, severe natural event, or physical attack.***

The Utility’s electricity and natural gas systems rely on a complex, interconnected network of generation, transmission, distribution, control, and communication technologies, which can be damaged by natural events-such as severe weather or seismic events-and by malicious events, such as cyber and physical attacks. Private and public entities, such as the North American Electric Reliability Corporation, and the U.S. federal government, including the Departments of Defense, Homeland Security and Energy, and the White House, have noted that cyber-attacks targeting utility systems are increasing in sophistication, magnitude, and frequency. The Utility’s operational networks also may face new cyber security risks due to modernizing and interconnecting the existing infrastructure with new technologies and control systems. Any failure or decrease in the functionality of the Utility’s operational networks could cause harm to the public or employees, significantly disrupt operations, negatively impact the Utility’s ability to safely generate, transport, deliver and store energy and gas or otherwise operate in the most safe and efficient manner or at all, and damage the Utility’s assets or operations or those of third parties.

The Utility also relies on complex information technology systems that allow it to create, collect, use, disclose, store and otherwise process sensitive information, including the Utility’s financial information, customer energy usage and billing information, and personal information regarding customers, employees and their dependents, contractors, and other individuals. In addition, the Utility often relies on third-party vendors to host, maintain, modify, and update its systems, and to provide other services to the Utility or the Utility’s customers. In addition, the Utility is increasingly being required to disclose large amounts of data (including customer energy usage and personal information regarding customers) to support changes to California’s electricity market related to grid modernization and customer choice. These third-party vendors could cease to exist, fail to establish adequate processes to protect the Utility’s systems and information, or experience security incidents or inadequate security measures. Any incidents or disruptions in the Utility’s information technology systems could impact the Utility’s ability to track or collect revenues and to maintain effective internal controls over financial reporting.

The Utility and its third-party vendors have been subject to, and will likely continue to be subject to, breaches and attempts to gain unauthorized access to the Utility’s information technology systems or confidential data (including information about customers and employees), or to disrupt the Utility’s operations. None of these breaches or attempts has individually or in the aggregate resulted in a security incident with a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. Despite implementation of security and control measures, there can be no assurance that the Utility will be able to prevent unauthorized access to its operational networks, information technology systems or data, or the disruption of its operations. Such events could subject the Utility to significant expenses, claims by customers or third parties, government inquiries, penalties for violation of applicable privacy laws, investigations, and regulatory actions that could result in material fines and penalties, loss of customers and harm to PG&E Corporation’s and the Utility’s reputation, any of which could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows.

The Utility maintains cyber liability insurance that covers certain damages caused by cyber incidents. However, there is no assurance that adequate insurance will continue to be available at rates the Utility believes are reasonable or that the costs of responding to and recovering from a cyber incident will be covered by insurance or recoverable through rates.

***The operation and decommissioning of the Utility’s nuclear generation facilities expose it to potentially significant liabilities and the Utility may not be able to fully recover its costs if regulatory requirements or operating conditions change or the facilities cease operations before the licenses expire.***

The operation of the Utility’s nuclear generation facilities exposes it to potentially significant liabilities from environmental, health and financial risks, such as risks relating to operation of the Diablo Canyon nuclear generation units as well as the storage, handling and disposal of spent nuclear fuel, and the release of radioactive materials caused by a nuclear accident, seismic activity, natural disaster, or terrorist act. If the Utility incurs losses that are either not covered by insurance or exceed the amount of insurance available, such losses could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. In addition, the Utility may be required under federal law to pay up to $275 million of liabilities arising out of each nuclear incident occurring not only at the Utility’s Diablo Canyon facility but at any other nuclear power plant in the United States.

On January 11, 2018, the CPUC approved the retirement of Diablo Canyon units by 2024 and 2025. However, the Utility continues to face public concern about the safety of nuclear generation and nuclear fuel. Some of these nuclear opposition groups regularly file petitions at the NRC and in other forums challenging the actions of the NRC and urging governmental entities to adopt laws or policies in opposition to nuclear power. Although an action in opposition may ultimately fail, regulatory proceedings may take longer to conclude and be more costly to complete. It is also possible that public pressure could grow leading to adverse changes in legislation, regulations, orders, or their interpretation. As a result, operations at the Utility’s two nuclear generation units at Diablo Canyon could cease before their respective licenses expire in 2024 and 2025. In such an instance, the Utility could be required to record a charge for the remaining amount of its unrecovered investment and such charge could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows.

In addition, in order to retain highly skilled personnel necessary to safely operate Diablo Canyon during the remaining years of operations, the Utility will incur costs in connection with (i) an employee retention program to ensure adequate staffing levels at Diablo Canyon, and (ii) an employee retraining and development program, to facilitate redeployment of a portion of Diablo Canyon personnel to the decommissioning project and elsewhere in the Utility. There can be no assurance that the Utility will be successful in retaining highly skilled personnel under its employee programs.

The Utility has incurred, and may continue to incur, substantial costs to comply with NRC regulations and orders. See “Regulatory Environment” in Item 1. Business above. If the Utility were unable to recover these costs, PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected. The Utility may determine that it cannot comply with the new regulations or orders in a feasible and economic manner and voluntarily cease operations; alternatively, the NRC may order the Utility to cease operations until the Utility can comply with new regulations, orders, or decisions. The Utility may incur a material charge if it ceases operations at Diablo Canyon’s two nuclear generation units before their respective licenses expire in 2024 and 2025. As of December 31, 2021, the Utility’s unrecovered investment in Diablo Canyon was $1.16 billion.

The Utility also has an obligation to decommission its electricity generation facilities, including its nuclear facilities, as well as gas transmission system assets, at the end of their useful lives. See “Asset Retirement Obligations” in Note 3 of the Notes to the Consolidated Financial Statement in Item 8. The Utility’s costs to decommission its nuclear facilities through nuclear decommissioning are subject to reasonableness review by the CPUC. The Utility will be responsible for any costs that the CPUC determines were not reasonably incurred. If the Utility’s actual decommissioning costs, including the amounts held in the nuclear decommissioning trusts, exceed estimated costs, PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected.

### Risks Related to Environmental Factors

***Severe weather conditions, extended drought, and climate change could materially affect PG&E Corporation and the Utility.***

Extreme weather, drought and shifting climate patterns have intensified the challenges associated with many of the other risks facing PG&E Corporation and the Utility, particularly wildfire management in California. The Utility’s service territory encompasses some of the most densely forested areas in California and, as a consequence, is subject to higher risk from vegetation-related ignition events than other California IOUs. Further, environmental extremes, such as drought conditions and extreme heat followed by periods of wet weather, can drive additional vegetation growth (which can then fuel fires) and influence both the likelihood and severity of extraordinary wildfire events. In particular, the risk posed by wildfires, including during the 2021 wildfire season, has increased in the Utility’s service area as a result of an ongoing extended period of drought, bark beetle infestations in the California forest and wildfire fuel increases due to rising temperatures and record rainfall following the drought, and strong wind events, among other environmental factors. As of December 31, 2021, more than 86% of California is experiencing severe to extreme drought. Moderate or severe drought conditions occur and can persist in virtually all of the Utility’s service territory. More than half of the Utility’s service area is in an HFTD. Contributing factors other than environmental can include local land use policies and historical forestry management practices. The combined effects of extreme weather and climate change also impact this risk. In January 2018, the CPUC approved a statewide fire-threat map that shows that approximately half of the Utility’s service territory is facing “elevated” or “extreme” fire danger. Approximately 25,000 circuit miles of the Utility’s nearly 81,000 distribution overhead circuit miles and approximately 5,500 miles of the nearly 18,000 transmission overhead circuit miles are in such HFTDs, significantly more in total than other California IOUs.

Severe weather events and other natural disasters, including wildfires and other fires, storms, tornadoes, floods, extreme heat events (including recent extreme heat events during the 2021 wildfire season), drought, earthquakes, lightning, tsunamis, rising sea levels, pandemics, solar events, electromagnetic events, wind events or other weather-related conditions, climate change, or natural disasters, could result in severe business disruptions, prolonged power outages, property damage, injuries and loss of life, significant decreases in revenues and earnings, and significant additional costs to PG&E Corporation and the Utility. Any such event could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. Any of such events also could lead to significant claims against the Utility. Further, these events could result in regulatory penalties and disallowances, particularly if the Utility encounters difficulties in restoring power to its customers on a timely basis or if the related losses are found to be the result of the Utility’s practices or the failure of electric and other equipment of the Utility.

Further, the Utility has been studying the potential effects of climate change (increased severity and frequency of storm events, sea level rise, land subsidence, change in temperature extremes, changes in precipitation patterns and drought, and wildfire) on its assets, operations, and services, and the Utility is developing adaptation plans to set forth a strategy for those events and conditions that the Utility believes are most significant. Consequences of these climate-driven events may vary widely and could include increased stress on the energy supply network due to new patterns of demand, reduced hydroelectric output, physical damage to the Utility’s infrastructure, higher operational costs, and an increase in the number and duration of customer outages and safety consequences for both employees and customers. As a result, the Utility’s hydroelectric generation could change, and the Utility would need to consider managing or acquiring additional generation. If the Utility increases its reliance on conventional generation resources to replace hydroelectric generation and to meet increased customer demand, it may become more costly for the Utility to comply with GHG emissions limits. In addition, climate hazards such as heatwaves, windstorms, and flooding caused by rising sea levels and extreme storms could damage the Utility’s facilities, including gas, generation, and electric transmission and distribution assets. The Utility could incur substantial costs to repair or replace facilities, restore service, or compensate customers and other third parties for damages or injuries. The Utility anticipates that the increased costs would be recovered through rates, but as rate pressures increase, the likelihood of disallowance or non-recovery may increase. See “Rising rates for the Utility’s customers could result in circumstances in which the Utility is unable to fully recover costs or earn its authorized ROE” above.

Events or conditions caused by climate change could have a greater impact on the Utility’s operations than the Utility’s studies suggest and could result in lower revenues or increased expenses, or both. If the CPUC fails to adjust the Utility’s rates to reflect the impact of events or conditions caused by climate change, PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected.

***The Utility’s operations are subject to extensive environmental laws, and such laws could change.***

The Utility’s operations are subject to extensive federal, state, and local environmental laws, regulations, and orders, relating to air quality, water quality and usage, remediation of hazardous wastes, and the protection and conservation of natural resources and wildlife. The Utility incurs significant capital, operating, and other costs associated with compliance with these environmental statutes, rules, and regulations. The Utility has been in the past, and may be in the future, required to pay for environmental remediation costs at sites where it is identified as a potentially responsible party under federal and state environmental laws. Although the Utility has recorded liabilities for known environmental obligations, these costs can be difficult to estimate due to uncertainties about the extent of contamination, remediation alternatives, the applicable remediation levels, and the financial ability of other potentially responsible parties. For more information, see Note 15 of the Notes to the Consolidated Financial Statements in Item 8.

Environmental remediation costs could increase in the future as a result of new legislation, the current trend toward more stringent standards, and stricter and more expansive application of existing environmental regulations. Failure to comply with these laws and regulations, or failure to comply with the terms of licenses or permits issued by environmental or regulatory agencies, could expose the Utility to claims by third parties or the imposition of civil or criminal fines or other sanctions.

The CPUC has authorized the Utility to recover its environmental remediation costs for certain sites through various ratemaking mechanisms. One of these mechanisms allows the Utility rate recovery for 90% of its hazardous substance remediation costs for certain approved sites without a reasonableness review. The CPUC may discontinue or change these ratemaking mechanisms in the future, or the Utility may incur environmental costs that exceed amounts the CPUC has authorized the Utility to recover through rates.

Some of the Utility’s environmental costs, such as the remediation costs associated with the Hinkley natural gas compressor site, are not recoverable through rates or insurance. See “Environmental Regulation” in Item 1. and Note 15 of the Notes to the Consolidated Financial Statements in Item 8. The Utility’s costs to remediate groundwater contamination near the Hinkley natural gas compressor site and to abate the effects of the contamination, changes in estimated costs, and the extent to which actual remediation costs differ from recorded liabilities have had, and may continue to have, a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows.

### Risks Related to Other Enforcement Matters, Investigations, and Regulatory Proceedings

***PG&E Corporation and the Utility are subject to the Enhanced Oversight and Enforcement Process.***

The EOEP is a six-step process with potentially escalating CPUC oversight and enforcement measures based on specific “triggering events” identified for each of the six steps. If the Utility is placed into the EOEP, it will be subject to additional reporting requirements and additional monitoring and oversight by the CPUC. Higher steps of the process (steps 3 through 6) also contemplate additional enforcement mechanisms, including appointment of an independent third-party monitor, appointment of a chief restructuring officer, pursuit of the receivership remedy, and review of the Utility’s Certificate of Public Convenience and Necessity (i.e., its license to operate as a utility). The process contains provisions for the Utility to cure and exit the process if it can satisfy specific criteria. The EOEP states that the Utility should presumptively move through the steps of the process sequentially, but the CPUC may place the Utility into the appropriate step of the process upon occurrence of a specified triggering event.

On April 15, 2021, the CPUC placed the Utility into step 1 of the EOEP for failing to sufficiently prioritize clearing vegetation on its highest risk power lines as part of the 2020 WMP work. There can be no assurance regarding if or when the Utility will exit the EOEP, or whether the CPUC will initiate another step 1 proceeding or whether the CPUC will seek to move the Utility into a higher step of the process. See “Enforcement and Litigation Matters” in Item 7. MD&A.

***PG&E Corporation and the Utility could be materially affected by legislative and regulatory developments.***

The Utility is subject to extensive regulations. PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected if the Wildfire Fund does not effectively mitigate the financial risk of liability for damages arising from catastrophic wildfires where the Utility’s facilities are a substantial cause. See “The Wildfire Fund and other provisions of AB 1054 may not effectively mitigate the risk of liability for damages arising from catastrophic wildfires.” above.

In June 2018, the State of California enacted the CCPA, which went into effect on January 1, 2020, with a 12-month look-back period requiring compliance by January 1, 2019. The State of California announced enacted regulations in August 2020 and March 2021 which provide guidance on the requirements of the CCPA. The CCPA requires companies that process information on California residents to make new disclosures to consumers about their data collection, use and sharing practices, allows consumers to opt out of certain data sharing with third parties and provides a new cause of action for data breaches. The CCPA provides for financial penalties in the event of non-compliance and statutory damages in the event of a data security breach. On November 3, 2020, Californians voted to approve Proposition 24, a ballot measure that creates the California Privacy Rights Act (the “CPRA”), which amended and expanded the CCPA. The State of California enacted the CPRA in November 2020, with most provisions operative as of January 1, 2023 and applicable to personal information collected beginning January 1, 2022. Failure to comply with the CCPA and the CPRA could result in the imposition of material fines imposed on PG&E Corporation and the Utility.

Also, SB 100 (the 100 Percent Clean Energy Act of 2018) increased the percentage from 50% to 60% of California’s electricity portfolio that must come from renewables by 2030; and established state policy that 100% of all retail electricity sales must come from renewable portfolio standard-eligible or carbon-free resources by 2045. Failure to comply with SB 100 could result in fines imposed on PG&E Corporation and the Utility that could be material.

***The Utility is subject to extensive regulations and the risk of enforcement proceedings in connection with compliance with such regulations.***

The Utility is subject to extensive regulations, including federal, state, and local energy, environmental and other laws and regulations, and the risk of enforcement proceedings in connection with compliance with such regulations. The Utility could incur material charges, including fines and other penalties, in connection with the Safety Culture OII (as defined in “Order Instituting an Investigation into PG&E Corporation’s and the Utility’s Safety Culture” under “Enforcement and Litigation Matters” in Item 7. MD&A) and other matters that the CPUC’s SED may be investigating. The SED could launch investigations at any time on any issue it deems appropriate. In addition, OEIS has authority to approve and oversee compliance with the WMP.

The Utility could be subject to additional regulatory or governmental enforcement action in the future with respect to compliance with federal, state, or local laws, regulations or orders that could result in additional fines, penalties or customer refunds, including those regarding renewable energy and RA requirements; customer billing; customer service; affiliate transactions; vegetation management; design, construction, operating and maintenance practices; safety and inspection practices; compliance with CPUC GOs or other applicable CPUC decisions or regulations; whether the Utility is able to achieve the targets in its WMPs; federal electric reliability standards; and environmental compliance. CPUC staff could also impose penalties on the Utility in the future in accordance with its authority under the gas and electric safety citation programs. The amount of such fines, penalties, or customer refunds could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows.

The Utility also is a target of a number of investigations, in addition to certain investigations in connection with the wildfires. See “Risks Related to Wildfires,” above. The Utility is unable to predict the outcome of pending investigations, including whether any charges will be brought against the Utility, or the amount of any costs and expenses associated with such investigations.

If these investigations result in enforcement action against the Utility, the Utility could incur additional fines or penalties the amount of which could be substantial and, in the event of a judgment against the Utility, suffer further ongoing negative consequences. Furthermore, a negative outcome in any of these investigations, or future enforcement actions, could negatively affect the outcome of future ratemaking and regulatory proceedings to which the Utility may be subject; for example, by enabling parties to challenge the Utility’s request to recover costs that the parties allege are somehow related to the Utility’s violations.

***The Utility’s ratemaking and cost recovery proceedings may not authorize sufficient revenues, or the Utility’s actual costs could exceed its authorized or forecasted costs due to various factors, including if the Utility is not able to manage its costs effectively.***

The Utility’s financial results depend on its ability to earn a reasonable return on capital, including long-term debt and equity, and to recover costs from its customers, through the rates it charges its customers as approved by the CPUC and the FERC. PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected if the CPUC or the FERC does not authorize sufficient revenues for the Utility or if the amount of actual costs incurred differs from the forecast or authorized costs embedded in rates. The outcome of the Utility’s ratemaking proceedings can be affected by many factors, including the level of opposition by intervening parties; potential rate impacts; increasing levels of regulatory review; changes in the political, regulatory, or legislative environments; and the opinions of the Utility’s regulators, consumer and other stakeholder organizations, and customers, about the Utility’s ability to provide safe, reliable, and affordable electric and gas services. If the CPUC does not authorize sufficient funding for investments in the Utility’s infrastructure, it may negatively impact the Utility's ability to modernize the grid and make it resilient to risks related to climate change, including wildfires.

In addition to the amount of authorized revenues, PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected if the Utility’s actual costs differ from authorized or forecast costs. The Utility’s ability to recover its costs and earn a reasonable rate of return can be affected by many factors, including the time delay between when costs are incurred and when those costs are recovered through rates. The CPUC or the FERC may not allow the Utility to recover costs on the basis that such costs were not reasonably or prudently incurred or for other reasons. Further, the Utility may be required to incur expenses before the relevant regulatory agency approves the recovery of such costs. For example, the Utility has incurred, and continues to incur, costs to strengthen its wildfire mitigation and prevention efforts before it is clear whether such costs will be recoverable through rates. Also, the CPUC may deny recovery of uninsured wildfire- related costs incurred by the Utility if the CPUC determines that the Utility was not prudent.

The Utility may incur additional costs or reduced revenue for many reasons including changing market circumstances, unanticipated events (such as wildfires, storms, earthquakes, accidents, or catastrophic or other events affecting the Utility’s operations), increased self-generation by customers, an increase in distributed generation, lower customer demand due to adverse economic conditions, the loss of the Utility’s customers to other retail providers like CCAs or DA providers, whether the CAISO wholesale electricity market continues to function effectively, returning customers, or compliance with new state laws or policies. See “Competition in the Electricity Industry” in Item 1.

### Risks Related to PG&E Corporation’s and the Utility’s Environment and Financial Condition

***PG&E Corporation’s and the Utility’s substantial indebtedness may adversely affect their financial health and operating flexibility.***

PG&E Corporation and the Utility have a substantial amount of indebtedness, most of which is secured by liens on certain assets of PG&E Corporation and the Utility. As of December 31, 2021, PG&E Corporation had approximately $4.71 billion of outstanding indebtedness (such indebtedness consisting of PG&E Corporation’s $1.0 billion aggregate principal amount of senior secured notes due 2028, $1.0 billion aggregate principal amount of senior secured notes due 2030, and borrowings under the $2.75 billion secured term loan agreement entered into in June 2020), and the Utility had approximately $38.3 billion of outstanding indebtedness (such indebtedness including outstanding First Mortgage Bonds, borrowings under the Utility Revolving Credit Agreement and borrowings under the Utility Term Loan Credit Agreement). In addition, PG&E Corporation had $500 million of additional borrowing capacity under the Corporation Revolving Credit Agreement, and the Utility had $1.4 billion of additional borrowing capacity under the Utility Revolving Credit Agreement. In addition, the Utility had outstanding preferred stock with an aggregate liquidation preference of $252 million.

Since PG&E Corporation and the Utility have a high level of debt, a substantial portion of cash flow from operations will be used to make payments on this debt. Furthermore, since a significant percentage of the Utility’s assets are used to secure its debt, this reduces the amount of collateral available for future secured debt or credit support and reduces its flexibility in operating these secured assets. This relatively high level of debt and related security could have other important consequences for PG&E Corporation and the Utility, including:

- limiting their ability or increasing the costs to refinance their indebtedness;
- limiting their ability to borrow additional amounts for working capital, capital expenditures, debt service requirements, execution of their business strategy or other purposes;
- limiting their ability to use operating cash flow in other areas of their business;
- increasing their vulnerability to general adverse economic and industry conditions, including increases in interest rates, particularly given their substantial indebtedness that bears interest at variable rates, as well as to catastrophic events; and
- limiting their ability to capitalize on business opportunities.

Under the terms of the agreements and indentures governing their respective indebtedness, PG&E Corporation and the Utility are permitted to incur additional indebtedness, some of which could be secured (subject to compliance with certain tests) and which could further accentuate these risks. As a result of the high level of indebtedness, PG&E Corporation and the Utility may be unable to generate sufficient cash through operations to service such debt, and may need to refinance such indebtedness at or prior to maturity and be unable to obtain financing on suitable terms or at all. As a capital-intensive company, the Utility relies on access to the capital markets. If the Utility were unable to access the capital markets or the cost of financing were to substantially increase, its financial condition, results of operations, liquidity, and cash flows could be materially affected. The Utility’s ability to obtain financing, as well as its ability to refinance debt and make scheduled payments of principal and interest, are dependent on numerous factors, including the Utility’s levels of indebtedness, maintenance of acceptable credit ratings, financial performance, liquidity and cash flow, and other market conditions. The Utility’s inability to service its substantial debt or access the financial markets on reasonable terms could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows.

***The documents that govern PG&E Corporation’s and the Utility’s indebtedness limit their flexibility in operating their business.***

PG&E Corporation’s and the Utility’s material financing agreements, including certain of their respective credit agreements and indentures, contain various covenants restricting, among other things, their ability to:

- incur or assume indebtedness or guarantees of indebtedness;
- incur or assume liens;
- sell or dispose of all or substantially all of its property or business;
- merge or consolidate with other companies;
- enter into any sale leaseback transactions; and
- enter into swap agreements.

The restrictions contained in these material financing agreements could affect PG&E Corporation’s and the Utility’s ability to operate their business and may limit their ability to react to market conditions or take advantage of potential business opportunities as they arise. For example, such restrictions could adversely affect PG&E Corporation’s and the Utility’s ability to finance their operations and expenditures, make strategic acquisitions, investments or alliances, sell assets, restructure their organization or finance their capital needs. Additionally, PG&E Corporation’s and the Utility’s ability to comply with these covenants and restrictions may be affected by events beyond their control, including prevailing regulatory, economic, financial and industry conditions.

### Parties have appealed the Confirmation Order.

Following entry of the Confirmation Order confirming the Plan, certain parties filed notices of appeal with respect to the Confirmation Order. While a number of such appeals have been dismissed, there can be no assurance that any of the remaining appeals will not be successful and, if successful, that any such appeal would not have a material adverse effect on PG&E Corporation and the Utility.

***PG&E Corporation may be required to issue shares with respect to HoldCo Rescission or Damage Claims, which would result in dilution to holders of PG&E Corporation common stock, or pay a material amount of cash with respect to allowed Subordinated Debt Claims.***

On the Emergence Date, PG&E Corporation issued to the Fire Victim Trust a number of shares of common stock equal to 22.19% of the outstanding common stock on such date. As further described in “Satisfaction of HoldCo Rescission or Damage Claims and Subordinated Debt Claims” in Note 14 of the Notes to the Consolidated Financial Statements in Item 8, PG&E Corporation may be required to issue shares of its common stock in satisfaction of allowed HoldCo Rescission or Damage Claims. If such issuance is required, it may be determined that, under the Plan, the Fire Victim Trust should receive additional shares of PG&E Corporation common stock such that it would have owned 22.19% of the outstanding common stock of reorganized PG&E Corporation on the Emergence Date, assuming that such issuance of shares in satisfaction of the HoldCo Rescission or Damage Claims had occurred on the Emergence Date. Any such issuances will result in dilution to anyone who holds shares of PG&E Corporation common stock prior to such issuance and may cause the trading price of PG&E Corporation shares to decline.

Additionally, PG&E Corporation may be required to pay a material amount of cash with respect to allowed Subordinated Debt Claims (as defined in “Satisfaction of HoldCo Rescission or Damage Claims and Subordinated Debt Claims” in Note 14 of the Notes to the Consolidated Financial Statements in Item 8). Such payment may have a material adverse impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows.

***Any substantial sale of stock by existing stockholders could depress the market value of PG&E Corporation’s common stock, thereby devaluing the market price.***

Certain stockholders, including the Fire Victim Trust, received a large number of shares in the Chapter 11 Cases and may continue to hold shares of PG&E Corporation. PG&E Corporation can make no prediction as to the effect, if any, that sales of shares, or the availability of shares for future sale, will have on the prevailing market price of shares of PG&E Corporation common stock. Sales of substantial amounts of shares of common stock in the public market, or the perception that such sales could occur, could depress prevailing market prices for such shares. Such sales may also make it more difficult for PG&E Corporation to sell equity securities or equity-linked securities in the future at a time and price which it deems appropriate.

PG&E Corporation may also sell additional shares of common stock in subsequent offerings or issue additional shares of common stock or securities convertible into shares of PG&E Corporation common stock. The issuance of any shares of PG&E Corporation common stock in future financings, acquisitions upon conversion or exercise of convertible securities, or otherwise may result in a reduction of the book value and market price of PG&E Corporation's outstanding common stock. If PG&E Corporation issues any such additional shares, the issuance will cause a reduction in the proportionate ownership and voting power of all current shareholders. PG&E Corporation cannot predict the size of future issuances of shares of PG&E Corporation common stock or securities convertible into shares of PG&E Corporation common stock or, for any issuance, the effect, if any, that such future issuances will have on the market price of PG&E Corporation's common stock.

***PG&E Corporation common stock is subject to ownership and transfer restrictions intended to preserve PG&E Corporation’s ability to use its net operating loss carryforwards and other tax attributes.***

PG&E Corporation has incurred and may also continue to incur in connection with the Plan significant net operating loss carryforwards and other tax attributes, the amount and availability of which are subject to certain qualifications, limitations and uncertainties. The Amended Articles (as defined below) impose certain restrictions on the transferability and ownership of PG&E Corporation common stock and preferred stock (together, the “capital stock”) and other interests designated as “stock” of PG&E Corporation by the Board of Directors as disclosed in an SEC filing (such stock and other interests, the “Equity Securities,” and such restrictions on transferability and ownership, the “Ownership Restrictions”) in order to reduce the possibility of an equity ownership shift that could result in limitations on PG&E Corporation’s ability to utilize net operating loss carryforwards and other tax attributes from prior taxable years or periods for federal income tax purposes. Any acquisition of PG&E Corporation capital stock that results in a shareholder being in violation of these restrictions may not be valid.

Subject to certain exceptions, the Ownership Restrictions restrict (i) any person or entity (including certain groups of persons) from directly or indirectly acquiring or accumulating 4.75% or more of the outstanding Equity Securities and (ii) the ability of any person or entity (including certain groups of persons) already owning, directly or indirectly, 4.75% or more of the Equity Securities to increase their proportionate interest in the Equity Securities. For more information, see “Because PG&E Corporation and the Utility have elected to treat the Fire Victim Trust as a grantor trust, the application of the Ownership Restrictions, as defined in PG&E Corporation’s Amended Articles of Incorporation, will be determined on the basis of a number of shares outstanding that could differ materially from the number of shares reported as outstanding on the cover page of its periodic reports under the Exchange Act” below. Any transferee receiving Equity Securities that would result in a violation of the Ownership Restrictions will not be recognized as a shareholder of PG&E Corporation or entitled to any rights of shareholders, including, without limitation, the right to vote and to receive dividends or distributions, whether liquidating or otherwise, in each case, with respect to the Equity Securities causing the violation.

The Ownership Restrictions remain in effect until the earliest of (i) the repeal, amendment, or modification of Section 382 (and any comparable successor provision) of the Internal Revenue Code, in a manner that renders the restrictions imposed by Section 382 of the Internal Revenue Code no longer applicable to PG&E Corporation, (ii) the beginning of a taxable year in which the Board of Directors of PG&E Corporation determines that no tax benefits attributable to net operating losses or other tax attributes are available, (iii) the date selected by the Board of Directors if it determines that the limitation amount imposed by Section 382 of the Internal Revenue Code as of such date in the event of an “ownership change” of PG&E Corporation (as defined in Section 382 of the Internal Revenue Code and Treasury Regulation Sections 1.1502-91 et seq.) would not be materially less than the net operating loss carryforwards or “net unrealized built-in loss” (within the meaning of Section 382 of the Internal Revenue Code and Treasury Regulation Sections 1.1502-91 et seq.) of PG&E Corporation, and (iv) the date selected by the Board of Directors if it determines that it is in the best interests of PG&E Corporation’s shareholders for the Ownership Restrictions to be removed or released. The Ownership Restrictions may also be waived by the Board of Directors on a case by case basis.

***Because PG&E Corporation and the Utility have elected to treat the Fire Victim Trust as a grantor trust, the application of the Ownership Restrictions, as defined in PG&E Corporation’s Amended Articles of Incorporation, will be determined on the basis of a number of shares outstanding that could differ materially from the number of shares reported as outstanding on the cover page of its periodic reports under the Exchange Act.***

The Plan contemplated that the Fire Victim Trust would be treated as a “qualified settlement fund” for U.S. federal and state income tax purposes, subject to PG&E Corporation’s ability to elect to treat the Fire Victim Trust as a grantor trust for U.S. federal and state income tax purposes instead. On July 8, 2021, PG&E Corporation, the Utility, ShareCo, and the Fire Victim Trust entered into the Share Exchange and Tax Matters Agreement, pursuant to which PG&E Corporation and the Utility made a grantor trust election for the Fire Victim Trust effective retroactively to the inception of the Fire Victim Trust.

As a result of the grantor trust election, shares of PG&E Corporation common stock owned by the Fire Victim Trust are treated as held by the Utility and, in turn attributed to PG&E Corporation for income tax purposes. Consequently, any shares owned by the Fire Victim Trust are effectively excluded from the total number of outstanding equity securities when calculating a person’s Percentage Stock Ownership (as defined in the Amended Articles) for purposes of the Ownership Restrictions. See “Tax Matters” in Item 7. MD&A for an example of these calculations. PG&E Corporation does not control the number of shares held by the Fire Victim Trust and is not able to determine in advance the number of shares the Fire Victim Trust will hold. PG&E Corporation intends to periodically make available to investors information about the number of shares of common stock held by the Fire Victim Trust, the Utility, and ShareCo as of a specified date for purposes of the Ownership Restrictions, including in its Quarterly Reports and Annual Reports filed with the SEC.

PG&E Corporation intends to enforce the Ownership Restrictions as described in the foregoing paragraph (calculated as excluding any shares owned by the Fire Victim Trust, the Utility, and ShareCo from the number of outstanding equity securities). All current and prospective shareholders are advised to consider the foregoing in determining their ownership and acquisition of PG&E Corporation common stock.

***PG&E Corporation may not be able to use some or all of its net operating loss carryforwards and other tax attributes to offset future income.***

As of December 31, 2021, PG&E Corporation had net operating loss carryforwards for PG&E Corporation’s consolidated group for U.S. federal and California income tax purposes of approximately $21.1 billion and $18.9 billion, respectively, and PG&E Corporation incurred and may also continue to incur in connection with the Plan significant net operating loss carryforwards and other tax attributes. The ability of PG&E Corporation to use some or all of these net operating loss carryforwards and certain other tax attributes may be subject to certain limitations. Under Section 382 of the Internal Revenue Code (which also applies for California state income tax purposes), if a corporation (or a consolidated group) undergoes an “ownership change,” such net operating loss carryforwards and other tax attributes may be subject to certain limitations. In general, an ownership change occurs if the aggregate stock ownership of certain shareholders (generally five percent shareholders, applying certain look-through and aggregation rules) increases by more than 50% over such shareholders’ lowest percentage ownership during the testing period (generally three years).

As of the date of this report, it is more likely than not that PG&E Corporation has not undergone an ownership change and its net operating loss carryforwards and other tax attributes are not limited by Section 382 of the Internal Revenue Code. However, whether PG&E Corporation underwent or will undergo an ownership change as a result of the transactions in PG&E Corporation’s equity that occurred pursuant to the Plan depends on several factors outside PG&E Corporation’s control and the application of certain laws that are uncertain in several respects. Accordingly, there can be no assurance that the IRS would not successfully assert that PG&E Corporation has undergone or will undergo an ownership change pursuant to the Plan. In addition, even if these transactions did not cause an ownership change, they may increase the likelihood that PG&E Corporation may undergo an ownership change in the future. If the IRS successfully asserts that PG&E Corporation did undergo, or PG&E Corporation otherwise does undergo, an ownership change, the limitation on its net operating loss carryforwards and other tax attributes under Section 382 of the Internal Revenue Code could be material to PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows.

In particular, limitations imposed on PG&E Corporation’s ability to utilize net operating loss carryforwards or other tax attributes could cause U.S. federal and California income taxes to be paid earlier than would be paid if such limitations were not in effect and could cause such net operating loss carryforwards or other tax attributes to expire unused, in each case reducing or eliminating the benefit of such net operating loss carryforwards and other tax attributes. In addition, PG&E Corporation’s ability to utilize its net operating loss carryforwards is critical to a successful rate-neutral securitization transaction and to PG&E Corporation’s and the Utility’s commitment to make certain operating and capital expenditures. Failure to consummate a securitization transaction or obtain alternative sources of capital could have a material adverse effect on PG&E Corporation and the Utility and the value of PG&E Corporation common stock.

***PG&E Corporation’s ability to pay dividends on shares of its common stock is subject to restrictions.***

Pursuant to the Confirmation Order, PG&E Corporation may not pay dividends on shares of its common stock until it recognizes $6.2 billion in Non-GAAP Core Earnings following the Emergence Date. “Non-GAAP Core Earnings” means GAAP earnings adjusted for certain non-core items.

Subject to the foregoing restrictions, any decision to declare and pay dividends in the future will be made at the discretion of the Board of Directors and will depend on, among other things, PG&E Corporation’s results of operations, financial condition, cash requirements, contractual restrictions, and other factors that the Board of Directors may deem relevant.

***PG&E Corporation is a holding company and relies on dividends, distributions and other payments, advances, and transfers of funds from the Utility to meet its obligations.***

PG&E Corporation conducts its operations primarily through its subsidiary, the Utility, and substantially all of PG&E Corporation’s consolidated assets are held by the Utility. Accordingly, PG&E Corporation’s cash flow and its ability to meet its debt service obligations under its existing and future indebtedness are largely dependent upon the earnings and cash flows of the Utility and the distribution or other payment of these earnings and cash flows to PG&E Corporation in the form of dividends or loans or advances and repayment of loans and advances from the Utility. The ability of the Utility to pay dividends or make other advances, distributions, and transfers of funds will depend on its results of operations and may be restricted by, among other things, applicable laws limiting the amount of funds available for payment of dividends and certain restrictive covenants contained in the agreements of those subsidiaries. Additionally, the Utility must use its resources to satisfy its own obligations, including its obligation to serve customers, to pay principal and interest on outstanding debt, to pay preferred stock dividends, and to meet its obligations to employees and creditors, before it can distribute cash to PG&E Corporation. Under the Utility’s Articles of Incorporation, the Utility cannot pay common stock dividends unless all cumulative preferred dividends on the Utility’s preferred stock have been paid. As of January 31, 2022, there were $59.1 million of such cumulative and unpaid dividends on the Utility’s preferred stock. In addition, the CPUC has imposed various conditions that govern the relationship between PG&E Corporation and the Utility, including financial conditions that require the Board of Directors to give first priority to the capital requirements of the Utility, as determined to be necessary and prudent to meet the Utility’s obligation to serve or to operate the Utility in a prudent and efficient manner. On February 8, 2022, the Board of Directors of the Utility authorized the payment of all cumulative and unpaid dividends on the Utility’s preferred stock as of January 31, 2022 totaling $59.1 million, payable on May 13, 2022, to holders of record on April 29, 2022 and declared a dividend on the Utility’s preferred stock totaling $3.5 million that will be accrued during the three-month period ending April 30, 2022, payable on May 15, 2022, to holders of record on April 29, 2022. It is uncertain when PG&E Corporation and the Utility will commence the payment of dividends on their common stock. The deterioration of income from, or other available assets of, the Utility for any reason could limit or impair the Utility’s ability to pay dividends or other distributions to PG&E Corporation, which could, in turn, materially and adversely affect PG&E Corporation’s ability to meet its obligations.

***California law and certain provisions in the Amended Articles and the amended and restated bylaws of PG&E Corporation (the “Amended Bylaws”) may prevent efforts by shareholders to change the direction or management of PG&E Corporation.***

The Amended Articles and the Amended Bylaws contain provisions that may make the acquisition of PG&E Corporation more difficult without the approval of the Board of Directors, including the following:

- until 2024, the Board of Directors will be divided into two equal classes, with members of each class elected in different years for different terms;
- only holders of shares who are entitled to cast ten percent or more of the votes can request a special meeting of the shareholders, and any such request must satisfy the requirements specified in the Amended Bylaws; action by shareholders may otherwise only be taken at an annual or special meeting duly called by or at the direction of a majority of the Board of Directors, or action by written consent signed by shareholders owning at least the number of votes necessary to authorize the action at a meeting where all shares entitled to vote were present;
- advance notice for all shareholder proposals is required; and
- any person acquiring PG&E Corporation Equity Securities will be restricted from owning 4.75% or more of such Equity Securities (as determined for federal income tax purposes (see “Tax Matters” in Item 7. MD&A)), subject to certain exceptions as may be determined by the Board of Directors of PG&E Corporation.

These and other provisions in the Amended Articles, the Amended Bylaws, and California law could make it more difficult for shareholders or potential acquirers to obtain control of the Board of Directors or initiate actions that are opposed by the then-current Board of Directors, including delaying or impeding merger, tender offer, or proxy contest involving PG&E Corporation. The existence of these provisions could negatively affect the price of PG&E Corporation common stock and limit opportunities for shareholders to realize value in a corporate transaction.

***PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows have been and could continue to be significantly affected by the outbreak of the COVID-19 pandemic.***

PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows have been (beginning in March 2020) and could continue to be significantly affected by the outbreak of the COVID-19 pandemic (and its variants), but the extent of such impact is uncertain.

PG&E Corporation and the Utility continue to evaluate the impact of the current COVID-19 outbreak on their business and financial results. The consequences of a continued and prolonged outbreak and resulting governmental and regulatory orders have had and could continue to have a negative impact on the Utility’s financial condition, results of operations, liquidity, and cash flows.

The outbreak of the COVID-19 pandemic and the resulting economic conditions, and resulting decrease in economic and industrial activity in the Utility’s service territory, have and will continue to have a significant adverse impact on the Utility’s customers. These circumstances have impacted and will continue to impact the Utility for a period of time that PG&E Corporation and the Utility are unable to predict. For example, the economic downturn has resulted in a reduction in customer receipts and collection delays throughout the COVID-19 pandemic.

The Utility’s accounts receivable balances over 30 days outstanding as of December 31, 2021 were approximately $1.1 billion, or $832 million higher as compared to the balances as of December 31, 2019. The Utility is unable to estimate the portion of the increase directly attributable to the COVID-19 pandemic. The Utility expects to continue experiencing an impact on monthly cash collections for as long as current COVID-19 circumstances persist.

On January 1, 2021, electric rates were reset using sales that were adjusted for the COVID-19 pandemic impacts and significant ongoing shortfalls are not currently expected in 2021. PG&E Corporation and the Utility are currently unable to quantify the long-term potential impact of the changes in customer collections or changes in energy demand on earnings and cash flows due, in part, to uncertainties regarding the timing, duration and intensity of the COVID-19 outbreak and the resulting economic downturn. Although the CPUC authorized the establishment of memorandum and balancing accounts to track costs associated with customer protection measures, the timing of regulatory relief, if any, and ultimate cost recovery from such accounts or otherwise, are uncertain.

The COVID-19 pandemic and resulting economic downturn have resulted and will continue to result in workforce disruptions, both in personnel availability (including a reduction in contract labor resources) and deployment. Increased governmental regulation of the COVID-19 pandemic protections, including vaccination mandates or testing requirement for workers, could result in employee attrition, workforce disruptions and increased supplier and contractor costs.

Although the Utility continues to prioritize customer and community safety, these disruptions necessitate changes to the Utility’s operating and capital expenditure plans, which could lead to project delays or service disruptions in certain programs. Delays in production and shipping of materials used in the Utility’s operations may also impact operations.

The Utility has experienced shortages in certain materials, longer lead times and delivery delays as a result of domestic and international raw material and labor shortages. If these disruptions to the supply chain persist or worsen, the Utility may be delayed or prevented from completing planned maintenance and capital projects work.

PG&E Corporation and the Utility expect additional financial impacts in the future as a result of the COVID-19 pandemic. Potential longer-term impacts of the COVID-19 pandemic on PG&E Corporation or the Utility include the potential for higher credit spreads, borrowing costs and incremental financing needs. PG&E Corporation’s and the Utility’s analysis of the potential impact of the COVID-19 pandemic is ongoing and subject to change. PG&E Corporation and the Utility are unable to predict the timing, duration or intensity of the COVID-19 pandemic situation and any resurgence of the COVID-19 pandemic and any variant strains of the COVID-19 virus, the effectiveness and intensity of measures to contain the COVID-19 pandemic (including availability and effectiveness of vaccines), and the effects of the COVID-19 situation on the business, financial condition and results of operations of PG&E Corporation and the Utility and on the business and general economic conditions in the State of California and the United States of America.

***Rising rates for the Utility’s customers could result in circumstances in which the Utility is unable to fully recover costs or earn its authorized ROE.***

The rates paid by the Utility’s customers are impacted by the Utility’s costs, commodity prices, and broader energy trends. The Utility’s capital investment plan, increasing procurement of renewable power and energy storage, increasing environmental regulations, leveling demand, and the cumulative impact of other public policy requirements, collectively place continuing upward pressure on customer rates. In particular, the Utility will need to make substantial, sustained investments to its infrastructure to adapt to climate change. For more information on factors that could cause the Utility’s costs to increase, see “The Utility’s ratemaking and cost recovery proceedings may not authorize sufficient revenues, or the Utility’s actual costs could exceed its authorized or forecasted costs due to various factors, including if the Utility is not able to manage its costs effectively” above. If customer rates increase, the CPUC may face greater pressure to approve lesser amounts in the Utility’s ratemaking or cost recovery proceedings.

The Utility generally recovers its electricity and natural gas procurement costs through rates as “pass-through” costs. Increases in the Utility’s commodity costs directly impact customer bills.

Increasing levels of self-generation of electricity by customers (primarily solar installations) and customer enrollment in NEM, which allows self-generating customers to receive bill credits for surplus power at the full retail rate, shifts costs to other customers. Under this structure, NEM customers do not pay their proportionate share of the cost of maintaining and operating the electric transmission and distribution system, subject to certain exceptions, while still receiving electricity from the system when their self-generation is inadequate to meet their electricity needs. These unpaid costs are subsidized by customers not participating in NEM. Accordingly, as more electric customers switch to NEM and self-generate energy, the burden on the remaining customers increases, which in turn encourages more self-generation, further increasing rate pressure on existing non-NEM customers.

Other long-term trends could also increase costs for gas customers. Natural gas providers are subject to compliance with CARB’s cap-and-trade program, and natural gas end-use customers have an increasing exposure to carbon costs under the program through 2030 (when the full cost will be reflected in customer bills). CARB may also require aggressive energy efficiency programs to reduce natural gas end use. Increased renewable portfolio standards generation in the electric sector could reduce electric generation gas load. Additionally, customers replacing natural gas appliances with electric appliances will lead to further reduced gas demand. The combination of reduced load and increased costs to maintain the gas system could result in higher natural gas customer bills. In addition, some local city governments have passed ordinances restricting use of natural gas in new construction and, if other jurisdictions follow suit, this could affect future demand for the provision of natural gas. If fewer customers receive gas from the Utility, the Utility’s gas system maintenance costs, many of which cannot be reduced in the short term even if gas quantities decrease, would be borne by fewer customers. Finally, a potential mandate to purchase renewable natural gas for core customers could lead to cost recovery risk if utilities are competing with the transportation sector without receiving the same incentives.

A confluence of technology-related cost declines and sustained federal or state subsidies could make a combination of distributed generation and energy storage a viable, cost-effective alternative to the Utility’s bundled electric service which could further reduce energy demand. Reduced energy demand or significantly slowed growth in demand due to customer migration to other energy providers, adoption of energy efficient technology, conservation, increasing levels of distributed generation and self-generation, unless substantially offset through regulatory cost allocations, could increase the energy rates for other customers.

If rates were to rise too rapidly, customer usage could decline. This decline would decrease the volume of sales, among which the Utility’s fixed costs are allocated, and increase rates.

To relieve some of this upward rate pressure, the CPUC may authorize lower revenues than the Utility requested or increase the period over which the Utility is allowed to recover amounts, which could impact the Utility’s ability to timely recover its operating costs. The Utility’s level of authorized capital investment could decline as well, leading to a slower growth in rate base and earnings. As a result, PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected.

### General Risk Factors

***The Utility may be unable to attract and retain qualified personnel and senior management talent, or prolonged labor disruptions may occur.***

The Utility’s workforce is aging, and many employees are or will become eligible to retire within the next few years. Although the Utility has undertaken efforts to recruit and train new field service personnel, the Utility may be faced with a shortage of experienced and qualified personnel. The majority of the Utility’s employees are covered by collective bargaining agreements with three unions. Labor disruptions could occur depending on the outcome of negotiations to renew the terms of these agreements with the unions or if tentative new agreements are not ratified by their members. In addition, some of the remaining non-represented Utility employees could join one of these unions in the future.

PG&E Corporation and the Utility also may face challenges in attracting and retaining senior management talent especially if they are unable to restore the reputational harm generated by the negative publicity stemming from the ongoing enforcement proceedings and the Chapter 11 Cases. Any such occurrences could materially affect PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. For more information about labor disruptions related to the COVID-19 pandemic, see “PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows have been and could continue to be significantly affected by the outbreak of the COVID-19 pandemic” above.

## Properties

As filed, 2,738 characters.

The Utility owns or has obtained the right to occupy or use real property comprising the Utility’s electricity and natural gas distribution facilities, electric generation facilities, natural gas gathering facilities and generation facilities, and natural gas and electricity transmission facilities, which are described in Item 1. Business, under “Electric Utility Operations” and “Natural Gas Utility Operations.” The Utility occupies or uses real property primarily through various leases, easements, rights-of-way, permits, or licenses from private landowners or governmental authorities. In total, the Utility occupies 9 million square feet of real property, including 7 million square feet owned by the Utility. On September 17, 2021, the sale of the SFGO closed and the Utility entered into a leaseback agreement with the new SFGO owner (the “Leaseback Agreement”) to lease back certain space within the SFGO to allow for additional time to relocate critical facilities to other Utility sites. The Leaseback Agreement commenced on September 17, 2021 and continues through various dates for the various leased spaces, with December 31, 2023 being the latest lease expiration date. On October 23, 2020, the Utility entered into an office lease agreement with BA2 300 Lakeside LLC for approximately 910,000 rentable square feet of space within the Lakeside Building to serve as the Utility’s principal administrative headquarters. The term of the lease will begin on or about April 8, 2022 and the lease grants the Utility an option to purchase the legal parcel that contains the Lakeside Building. For more information, see Note 15 of the Notes to the Consolidated Financial Statements in Item 8.

PG&E Corporation also leases approximately 42,000 square feet of office space from a third party in San Francisco, California. This lease will expire and be surrendered at the end of February 2022.

The Utility currently owns approximately 148,000 acres of land, including approximately 121,000 acres of watershed lands. In 2002, the Utility agreed to implement its Land Conservation Commitment (“LCC”) to permanently preserve the six “beneficial public values” on all the watershed lands through conservation easements or equivalent protections, as well as to make approximately 40,000 acres of the watershed lands available for donation to qualified organizations. The six “beneficial public values” being preserved by the LCC include: natural habitat of fish, wildlife, and plants; open space; outdoor recreation by the general public; sustainable forestry; agricultural uses; and historic values. The Utility’s goal is to implement all the LCC transactions by the end of 2023, subject to securing all required regulatory approvals.

## Legal proceedings

As filed, 368 characters.

PG&E Corporation and the Utility are parties to various lawsuits and regulatory proceedings in the ordinary course of their business. For more information regarding material lawsuits and proceedings, see “Enforcement and Litigation Matters” in Item 7. MD&A, Item 1A. Risk Factors and Notes 2, 14, and 15 of the Notes to the Consolidated Financial Statements in Item 8.

## Management's discussion and analysis

As filed, 165,136 characters.

### OVERVIEW

This is a combined report of PG&E Corporation and the Utility, and includes separate Consolidated Financial Statements for each of these two entities. This combined MD&A should be read in conjunction with the Consolidated Financial Statements and the Notes to the Consolidated Financial Statements included in Item 8.

### Summary of Changes in Net Income and Earnings per Share

PG&E Corporation’s net loss attributable to common shareholders was $102 million in 2021, compared to $1.3 billion in 2020. In the year ended December 31, 2021, PG&E Corporation recorded a $1.3 billion charge, net of tax as a result of the grantor trust election, with no similar amount in 2020. This amount is partially offset by increases in base revenues authorized in the 2020 GRC and previously deferred costs associated with various regulatory proceedings in the year ended December 31, 2021. In the year ended December 31, 2020, PG&E Corporation recognized $1.1 billion of expense related to the Backstop Commitment Premium Shares and $452 million of expense related to the Additional Backstop Premium Shares, with no similar amounts in 2021.

### Key Factors Affecting Financial Results

PG&E Corporation and the Utility believe that their financial condition, results of operations, liquidity, and cash flows may be materially affected by the following factors:

- *The Uncertainties in Connection with Any Future Wildfires, Wildfire Insurance, and AB 1054.* While PG&E Corporation and the Utility cannot predict the occurrence, timing or extent of damages in connection with future wildfires, factors such as environmental conditions (including weather and vegetation conditions) and the efficacy of wildfire risk mitigation initiatives are expected to influence the frequency and severity of future wildfires. To the extent that future wildfires occur in the Utility’s service territory, the Utility may incur costs associated with the investigations of the causes and origins of such fires, even if it is subsequently determined that such fires were not caused by the Utility’s facilities. The financial impact of future wildfires could be mitigated through insurance, the Wildfire Fund or other forms of cost recovery. However, the Utility may not be able to obtain sufficient wildfire insurance coverage at a reasonable cost, or at all, and any such coverage may include limitations that could result in substantial uninsured losses depending on the amount and type of damages resulting from covered events, including coverage limitations applicable to different insurance layers. The Utility will not be able to obtain any recovery from the Wildfire Fund for wildfire-related losses in any Wildfire Fund coverage year (“Coverage Year”) that do not exceed the greater of $1.0 billion in the aggregate and the amount of insurance coverage required under AB 1054. In addition, the policy reforms contemplated by AB 1054 are likely to affect the financial impact of future wildfires on PG&E Corporation and the Utility should any such wildfires occur. The Wildfire Fund is available to the Utility to pay eligible claims for liabilities arising from wildfires and serves as an alternative to traditional insurance products, provided that the Utility satisfies the conditions to the Utility’s ongoing participation in the Wildfire Fund set forth in AB 1054 and that the Wildfire Fund has sufficient remaining funds. See “Loss Recoveries” in Note 14 of the Notes to the Consolidated Financial Statements in Item 8.

However, the impact of AB 1054 on PG&E Corporation and the Utility is subject to numerous uncertainties, including the Utility’s ability to demonstrate to the CPUC that wildfire-related costs paid from the Wildfire Fund were just and reasonable and therefore not subject to reimbursement, and whether the benefits of participating in the Wildfire Fund ultimately outweigh its substantial costs. Finally, even if the Utility satisfies the ongoing eligibility and other requirements set forth in AB 1054, for eligible claims against the Utility arising from wildfires that occurred between July 12, 2019 and the Utility’s emergence from Chapter 11 on July 1, 2020, the availability of the Wildfire Fund to pay such claims would be capped at 40% of the allowed amount of such claims. See “Wildfire Fund under AB 1054” in Note 14 of the Notes to the Consolidated Financial Statements in Item 8.

- *The Costs, Effectiveness, and Execution of the Utility’s Wildfire Mitigation Initiatives.* In response to the wildfire threat facing California, PG&E Corporation and the Utility have taken aggressive steps to mitigate the threat of catastrophic wildfires, the spread of wildfires should they occur and the impact of PSPS events.

PG&E Corporation and the Utility incurred substantial expenditures in 2020 and 2021 in connection with the 2020-2022 WMP. For more information, see Note 4 of the Notes to the Consolidated Financial Statements in Item 8. The Utility expects that its wildfire mitigation initiatives will continue to involve substantial and ongoing expenditures. The extent to which the Utility will be able to recover these expenditures and potential other costs through rates is uncertain.

The Utility has implemented operational changes and investments that reduce wildfire risk, including the EPSS, PSPS, vegetation management, asset inspection, and system hardening programs. These programs, particularly the PSPS and EPSS programs, have been the subject of significant scrutiny and criticism by various stakeholders, including the California governor, the CPUC and the court that oversaw the Utility’s probation. The PSPS and EPSS programs have had an adverse impact on PG&E Corporation’s and the Utility’s reputation with customers, regulators and policymakers, and future PSPS events may increase these negative perceptions. See “OII to Examine the Late 2019 Public Safety Power Shutoff Events” in “Regulatory Matters” below.

The Utility is subject to a number of legal and regulatory requirements related to its wildfire mitigation efforts, which require periodic inspections of electric assets and ongoing reporting related to this work. Although the Utility believes that it has complied substantially with these requirements, it is undertaking a review and has identified instances of noncompliance. The Utility intends to update the CPUC and OEIS as its review progresses. The Utility could face fines, penalties, enforcement action, or other adverse legal or regulatory consequences for the late inspections or other noncompliance related to wildfire mitigation efforts. See “Self-Reports to the CPUC” in “Regulatory Matters” below.

While PG&E Corporation and the Utility are committed to taking aggressive wildfire mitigation actions, if additional requirements are imposed that go beyond current expectations, such requirements could have a substantial impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. The success of the Utility’s wildfire mitigation efforts depends on many factors, including on whether the Utility is able to retain or contract for the workforce necessary to execute its wildfire mitigation actions. See “Order Instituting Investigation into the 2017 Northern California Wildfires and the 2018 Camp Fire” in Note 15 of the Notes to the Consolidated Financial Statements in Item 8.

- *The Timing and Outcome of Ratemaking Proceedings.* The Utility’s financial results may be impacted by the timing and outcome of its FERC TO18 rate case and the resulting impact on the TO19 and TO20 rate cases, 2023 GRC, WMCE applications, and its ability to timely recover costs not currently in rates, including costs already incurred and future costs tracked in its CEMA, WEMA, WMPMA, FRMMA, CPPMA, VMBA, WMBA, and RTBA. The outcome of regulatory proceedings can be affected by many factors, including intervening parties’ testimonies, potential rate impacts, the regulatory and political environments, and other factors. See Notes 4 and 15 of the Notes to the Consolidated Financial Statements in Item 8 and “Regulatory Matters” below.
- *The Impact of Wildfires*. PG&E Corporation’s and the Utility’s liabilities for the 2019 Kincade fire, the 2020 Zogg fire, or the 2021 Dixie fire, are significant and may be excluded from any potential amounts recoverable under applicable insurance policies, the WEMA, FERC TO rates, or the Wildfire Fund under AB 1054. Recorded liabilities in connection with the 2019 Kincade fire and the 2021 Dixie fire have already exceeded potential amounts recoverable under applicable insurance policies. Liabilities in excess of recoverable amounts for these wildfires could have a material impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows.

As of December 31, 2021, PG&E Corporation and the Utility had recorded an aggregate liability of $800 million, $375 million, and $1.15 billion for claims in connection with the 2019 Kincade fire, the 2020 Zogg fire, and the 2021 Dixie fire, respectively, and in each case before available insurance and other probable cost recoveries in the case of the 2021 Dixie fire. These liability amounts correspond to the lower end of the range of reasonably estimable probable losses, but do not include all categories of potential damages and losses. Claims related to the 2019 Kincade fire that were not satisfied in full as of the Emergence Date were not discharged in connection with emerging from Chapter 11.

On April 6, 2021, the Sonoma County District Attorney’s Office charged the Utility with five felonies and 28 misdemeanors in connection with the 2019 Kincade fire, and on January 28, 2022, the Sonoma County District Attorney’s Office filed the Kincade Amended Complaint, which replaced two felonies with five different felonies and dropped six misdemeanor counts. On September 24, 2021, the Shasta County District Attorney’s Office charged the Utility with 11 felonies and 20 misdemeanors in connection with the 2020 Zogg fire and three other fires. If the Utility were to be convicted of certain charges in the Kincade Amended Complaint or the Zogg Complaint, the Utility could be subject to material fines, penalties, and restitution, as well as non-monetary remedies such as oversight requirements, and accordingly the Utility currently believes that, depending on which charges it were to be convicted of, its total losses associated with the 2019 Kincade fire or the 2020 Zogg fire would materially exceed the $800 million or $375 million, respectively, of aggregate liability that PG&E Corporation and the Utility have recorded.

If the eligible claims for liabilities arising from wildfires were to exceed $1.0 billion in any Coverage Year, the Utility may be eligible to make a claim to the Wildfire Fund under AB 1054 for such excess amount, except that recoveries for the 2019 Kincade fire would be subject to the 40% limitation on the allowed amount of claims arising before emergence from bankruptcy, and recoveries for each of these fires would also be subject to the other limitations and requirements under AB 1054. As of December 31, 2021, the Utility had recorded insurance receivables of $430 million for the 2019 Kincade fire, $337 million for the 2020 Zogg fire, and $563 million for the 2021 Dixie fire. The Utility had recorded regulatory recovery and Wildfire Fund receivables of $448 million and $150 million, respectively, for the 2021 Dixie fire. However, there can be no assurance that such amounts will ultimately be recovered, and the Utility does not expect that any of its liability insurance would cover restitution payments ordered by the courts presiding over the criminal proceedings. See “2019 Kincade Fire,” “2020 Zogg Fire,” and “2021 Dixie Fire” in Note 14 of the Notes to the Consolidated Financial Statements in Item 8 for more information.

- *The Outcome of Other Enforcement, Litigation, and Regulatory Matters, and Other Government Proposals.* The Utility’s financial results may continue to be impacted by the outcome of other current and future enforcement, litigation, and regulatory matters, including those described above as well as the outcome of the Safety Culture OII, and potential penalties in connection with the Utility’s WMP and safety and other self-reports. See Note 15 of the Notes to the Consolidated Financial Statements in Item 8. In addition, the Utility’s business profile and financial results could be impacted by the outcome of recent calls for municipalization of part or all of the Utility’s businesses, offers by municipalities and other public entities to acquire the electric assets of the Utility within their respective jurisdictions and calls for state intervention, including the possibility of a state takeover of the Utility. PG&E Corporation and the Utility cannot predict the nature, occurrence, timing or extent of any such scenario, and there can be no assurance that any such scenario would not involve significant ownership or management changes to PG&E Corporation or the Utility, including by the state of California. Further, certain parties filed notices of appeal with respect to the Confirmation Order, including provisions related to the injunction contained in the Plan that channels certain pre-petition fire-related claims to trusts to be satisfied from the trusts’ assets. There can be no assurance that any such appeal will not be successful and, if successful, that any such appeal would not have a material adverse effect on PG&E Corporation and the Utility.
- *The Uncertainties in Connection with the Enhanced Oversight and Enforcement Process.* On April 15, 2021, the CPUC placed the Utility in step 1 of the EOEP. As a result, the Utility is subject to additional reporting requirements, monitoring, and oversight by the CPUC. See “Enhanced Oversight and Enforcement Process” in “Enforcement and Litigation Matters” below.
- *The Impact of the COVID-19 Pandemic.* PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows have been and could continue to be significantly affected by the outbreak of the COVID-19 pandemic. The principal areas of near-term impact include liquidity, financial results and business operations, stemming primarily from the ongoing economic hardship of the Utility’s customers, the moratorium on service disconnections, and an observed reduction in non-residential electrical load. The Utility continues to monitor the overall impact of the COVID-19 pandemic; however, the Utility expects a significant impact on monthly cash collections as long as current circumstances persist. PG&E Corporation and the Utility expect additional financial impacts in the future as a result of COVID-19 pandemic. Other impacts of COVID-19 pandemic on PG&E Corporation and the Utility have included operational disruptions, workforce disruptions, both in personnel availability (including a reduction in contract labor resources) and deployment, delays in production and shipping of materials used in the Utility’s operations, higher credit spreads and borrowing costs and could potentially also include a reduction in revenue due to the cost of capital adjustment mechanism and incremental financing needs. For more information on the impact of COVID-19 pandemic on PG&E Corporation and the Utility, see “PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows have been and could continue to be significantly affected by the outbreak of the COVID-19 pandemic.” in Item 1A Risk Factors and “COVID-19” in Liquidity and Financial Resources below.

For more information about the risks that could materially affect PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows, or that could cause future results to differ from historical results, see Item 1A. Risk Factors. In addition, this annual report contains forward-looking statements that are necessarily subject to various risks and uncertainties. These statements reflect management’s judgment and opinions that are based on current estimates, expectations, and projections about future events and assumptions regarding these events and management’s knowledge of facts as of the date of this report. See “Forward-Looking Statements” above for a list of some of the factors that may cause actual results to differ materially. PG&E Corporation and the Utility are unable to predict all the factors that may affect future results and do not undertake an obligation to update forward-looking statements, whether in response to new information, future events, or otherwise.

### Tax Matters

PG&E Corporation had a U.S. federal net operating loss carryforward of approximately $21.1 billion and California net operating loss carryforward of $18.9 billion at the end of 2021.

Under Section 382 of the Internal Revenue Code, if a corporation (or a consolidated group) undergoes an “ownership change,” net operating loss carryforwards and other tax attributes may be subject to certain limitations. In general, an ownership change occurs if the aggregate stock ownership of certain shareholders (generally five percent shareholders, applying certain look-through and aggregation rules) increases by more than 50% over such shareholders’ lowest percentage ownership during the testing period (generally three years). PG&E Corporation’s and the Utility’s Amended Articles limit Transfers (as defined in the Amended Articles) that increase a person’s or entity’s (including certain groups of persons) ownership of PG&E Corporation’s equity securities to 4.75% or more prior to the Restriction Release Date (as defined in the Amended Articles) without approval by the Board of Directors of PG&E Corporation (the “Ownership Restrictions”). As discussed below under “Update on Ownership Restrictions in PG&E Corporation’s Amended Articles,” due to the election to treat the Fire Victim Trust as a grantor trust for income tax purposes, the calculation of Percentage Stock Ownership (as defined in the Amended Articles) will effectively be based on a reduced number of shares outstanding, namely the total number of outstanding equity securities less the number of equity securities held by the Fire Victim Trust, the Utility and ShareCo. As of the date of this report, it is more likely than not that PG&E Corporation has not undergone an ownership change, and consequently, its net operating loss carryforwards and other tax attributes are not limited by Section 382 of the Internal Revenue Code.

On July 8, 2021, PG&E Corporation, the Utility, ShareCo and the Fire Victim Trust entered into the Share Exchange and Tax Matters Agreement, pursuant to which PG&E Corporation and the Utility made a grantor trust election for the Fire Victim Trust effective retroactively to the inception of the Fire Victim Trust.

As a result of the benefits of a grantor trust election, the Utility’s tax deductions occur when the Fire Victim Trust pays the fire victims, rather than when the Utility transferred cash and other property (including PG&E Corporation common stock) to the Fire Victim Trust. Therefore, $5.4 billion of cash and $4.54 billion of PG&E Corporation common stock, in the aggregate $10.0 billion, that were transferred to the Fire Victim Trust in 2020, will not be deductible for tax purposes by the Utility until the Fire Victim Trust pays the fire victims.

Furthermore, the activities of the Fire Victim Trust are treated as activities of the Utility for tax purposes. PG&E Corporation’s net operating loss has decreased by approximately $10.0 billion which will be offset by payments made by the Fire Victim Trust to the fire victims (which totaled approximately $1.67 billion in 2021) and the net activities of the Fire Victim Trust. Additionally, there was a $1.3 billion charge, net of tax, decreasing net DTAs for the payment made to the Fire Victim Trust in PG&E Corporation common stock on its Consolidated Financial Statements for activity through December 31, 2020. PG&E Corporation will recognize income tax benefits and the corresponding DTA as the Fire Victim Trust sells shares of PG&E Corporation common stock, and the amounts of such benefits and assets will be impacted by the price at which the Fire Victim Trust sells the shares, rather than the price at the time such shares were transferred to the Fire Victim Trust. As of December 31, 2021, to the knowledge of PG&E Corporation, the Fire Victim Trust had not sold any shares of PG&E Corporation common stock, resulting in no tax impact on PG&E Corporation’s and the Utility’s Consolidated Financial Statements for the year ended December 31, 2021. On January 31, 2022, the Fire Victim Trust initiated an exchange of 40,000,000 Plan Shares for an equal number of New Shares in the manner contemplated by the Share Exchange and Tax Matters Agreement and announced that it had entered into a transaction for the sale of these shares.

### Update on Ownership Restrictions in PG&E Corporation’s Amended Articles

As a result of the grantor trust election, shares of PG&E Corporation common stock owned by the Fire Victim Trust are treated as held by the Utility and, in turn, attributed to PG&E Corporation for income tax purposes. Consequently, any shares of PG&E Corporation common stock owned by the Fire Victim Trust, along with any shares owned by the Utility directly, are effectively excluded from the total number of outstanding equity securities when calculating a person’s Percentage Stock Ownership (as defined in the Amended Articles) for purposes of the 4.75% ownership limitation in the Amended Articles. Shares owned by ShareCo are also effectively excluded because ShareCo is a disregarded entity for income tax purposes. For example, although PG&E Corporation had 2,463,891,104 shares outstanding as of February 4, 2022, only 1,548,403,924 shares (the number of outstanding shares of common stock less the number of shares held by the Fire Victim Trust, the Utility and ShareCo) count as outstanding for purposes of the ownership restrictions in the Amended Articles. As such, based on the total number of outstanding equity securities and assuming the Fire Victim Trust has not sold any shares of PG&E Corporation common stock, a person’s effective Percentage Stock Ownership limitation for purposes of the Amended Articles as of February 4, 2022 was 2.98% of outstanding shares. As of December 31, 2021, to the knowledge of PG&E Corporation, the Fire Victim Trust had not sold any shares of PG&E Corporation common stock. On January 31, 2022, the Fire Victim Trust initiated an exchange of 40,000,000 Plan Shares for an equal number of New Shares in the manner contemplated by the Share Exchange and Tax Matters Agreement and announced that it had entered into a transaction for the sale of these shares.

### RESULTS OF OPERATIONS

The following discussion presents PG&E Corporation’s and the Utility’s operating results for 2021, 2020, and 2019. See “Key Factors Affecting Financial Results” above for further discussion about factors that could affect future results of operations.

The consolidated results of operations consist primarily of results related to the Utility, which are discussed in the “Utility” section below. The following table provides a summary of net income (loss) available for common shareholders:

*(in millions)*

|  | 2021 | 2020 | 2019 |
| --- | ---: | ---: | ---: |
| Consolidated Total | $(102) | $(1,318) | $(7,656) |
| PG&E Corporation | (226) | (1,715) | (20) |
| Utility | 124 | 397 | (7,636) |

PG&E Corporation’s net loss decreased in 2021, as compared to 2020 and primarily consists of income taxes, interest expense on long-term debt, and reorganization items, net. PG&E Corporation’s net loss for the year ended December 31, 2020 included $1.5 billion in expense related to the Backstop Commitment Premium Shares and Additional Backstop Premium Shares, which is not deductible for tax purposes.

### Utility

The table below shows certain items from the Utility’s Consolidated Statements of Income for 2021, 2020, and 2019. The table separately identifies the revenues and costs that impacted earnings from those that did not impact earnings. In general, expenses the Utility is authorized to pass through directly to customers (such as costs to purchase electricity and natural gas, as well as costs to fund public purpose programs) and the corresponding amount of revenues collected to recover those pass-through costs, do not impact earnings.

Revenues that impact earnings are primarily those that have been authorized by the CPUC and the FERC to recover the Utility’s costs to own and operate its assets and to provide the Utility an opportunity to earn its authorized rate of return on rate base. Expenses that impact earnings are primarily those that the Utility incurs to own and operate its assets.

*(in millions)*

|  | 2021 Revenues and Costs: That Impacted Earnings | That Did Not Impact Earnings | Total Utility | 2020 Revenues and Costs: That Impacted Earnings | That Did Not Impact Earnings | Total Utility | 2019 Revenues and Costs: That Impacted Earnings | That Did Not Impact Earnings | Total Utility |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Electric operating revenues | $9,542 | $5,589 | $15,131 | $8,979 | $4,879 | $13,858 | $8,634 | $4,106 | $12,740 |
| Natural gas operating revenues | 3,753 | 1,758 | 5,511 | 3,460 | 1,151 | 4,611 | 3,259 | 1,130 | 4,389 |
| **Total operating revenues** | **13,295** | **7,347** | **20,642** | **12,439** | **6,030** | **18,469** | **11,893** | **5,236** | **17,129** |
| Cost of electricity | — | 3,232 | 3,232 | — | 3,116 | 3,116 | — | 3,095 | 3,095 |
| Cost of natural gas | — | 1,149 | 1,149 | — | 782 | 782 | — | 734 | 734 |
| Operating and maintenance | 6,820 | 3,374 | 10,194 | 6,399 | 2,308 | 8,707 | 7,167 | 1,583 | 8,750 |
| Wildfire-related claims, net of insurance recoveries | 258 | — | 258 | 251 | — | 251 | 11,435 | — | 11,435 |
| Wildfire fund expense | 517 | — | 517 | 413 | — | 413 | — | — | — |
| Depreciation, amortization, and decommissioning | 3,403 | — | 3,403 | 3,469 | — | 3,469 | 3,233 | — | 3,233 |
| **Total operating expenses** | **10,998** | **7,755** | **18,753** | **10,532** | **6,206** | **16,738** | **21,835** | **5,412** | **27,247** |
| **Operating income (loss)** | **2,297** | **(408)** | **1,889** | **1,907** | **(176)** | **1,731** | **(9,942)** | **(176)** | **(10,118)** |
| Interest income | 22 | — | 22 | 39 | — | 39 | 82 | — | 82 |
| Interest expense | (1,373) | — | (1,373) | (1,111) | — | (1,111) | (912) | — | (912) |
| Other income, net | 104 | 408 | 512 | 294 | 176 | 470 | 63 | 176 | 239 |
| Reorganization items, net | (12) | — | (12) | (310) | — | (310) | (320) | — | (320) |
| **Income (loss) before income taxes** | $1,038 | $— | $1,038 | $819 | $— | $819 | $(11,029) | $— | $(11,029) |
| Income tax provision (benefit) (1) |  |  | 900 |  |  | 408 |  |  | (3,407) |
| **Net income (loss)** |  |  | 138 |  |  | 411 |  |  | (7,622) |
| Preferred stock dividend requirement (1) |  |  | 14 |  |  | 14 |  |  | 14 |
| **Income (loss) Attributable to Common Stock** |  |  | **$124** |  |  | **$397** |  |  | **$(7,636)** |

(1) These items impacted earnings.

### Utility Revenues and Costs that Impacted Earnings

The following discussion presents the Utility’s operating results for 2021, 2020, and 2019, focusing on revenues and expenses that impacted earnings for these periods.

### Operating Revenues

The Utility’s electric and natural gas operating revenues that impacted earnings increased by $856 million, or 7%, in 2021 compared to 2020, primarily due to increased base revenues authorized in the 2020 GRC and FERC formula rates.

The Utility’s electric and natural gas operating revenues that impacted earnings increased by $546 million, or 5%, in 2020 compared to 2019, primarily due to increased base revenues authorized in the 2020 GRC and 2019 GT&S rate cases, additional revenues recorded pursuant to the TO20 rate case, and CEMA interim rate relief.

### Operating and Maintenance

The Utility’s operating and maintenance expenses that impacted earnings increased by $421 million, or 7%, in 2021 compared to 2020, primarily due to increases in labor and insurance costs as well as a $135 million charge related to wildfire response and mitigation regulatory matters, including the 2020 WMCE settlement. These increases were partially offset by $298 million in previously deferred CEMA costs recorded in conjunction with interim rate relief in 2020, with no comparable costs in 2021.

The Utility’s operating and maintenance expenses that impacted earnings decreased by $768 million, or 11%, in 2020 compared to 2019, primarily due to a reduction in accelerated transmission inspection and repair costs of approximately $460 million. Additionally, in 2019 the Utility recorded $398 million related to the Wildfires OII settlement and $237 million in disallowed costs for previously incurred capital expenditures in excess of adopted amounts in the 2019 GT&S rate case in 2019, with no similar charges in 2020. These decreases were partially offset by an increase of $223 million in previously deferred CEMA costs recorded in conjunction with interim rate relief (see “2018 CEMA Application” below) (the Utility amortized $298 million in deferred CEMA costs in 2020, compared to $75 million amortized in 2019). The Utility also experienced increased insurance premium costs in the year ended December 31, 2020, compared to 2019.

### Wildfire-Related Claims, Net of Recoveries

Costs related to wildfires that impacted earnings increased by $7 million, or 3%, in 2021 compared to 2020. The Utility recognized pre-tax charges of $1.15 billion related to the 2021 Dixie fire, offset by $563 million of probable insurance recoveries, $347 million of probable recoveries through the WEMA, and $150 million of probable recoveries from the Wildfire Fund in 2021, with no comparable charges and recoveries in 2020. The Utility recognized pre-tax charges of $175 million related to the 2019 Kincade fire in the year ended December 31, 2021, as compared to $625 million, partially offset by $430 million of probable insurance recoveries in the year ended December 31, 2020. Additionally, the Utility recognized pre-tax charges of $100 million related to the 2020 Zogg fire, fully offset by $100 million of probable insurance recoveries, in the year ended December 31, 2021, as compared to pre-tax charges of $275 million, partially offset by $219 million of probable insurance recoveries in the year ended December 31, 2020.

In addition to the probable wildfire-related recoveries noted above, in 2021, the Utility recorded $101 million of probable recoveries through FERC TO formula rates, which are recorded as a reduction to regulatory liabilities and are not captured in wildfire-related claims, which along with the items noted above, fully offset the $1.15 billion charge related to the 2021 Dixie fire.

Costs related to wildfires that impacted earnings decreased by $11.2 billion, or 98%, in 2020 compared to 2019. The Utility recognized pre-tax charges of $625 million related to the 2019 Kincade fire, partially offset by $430 million of probable insurance recoveries, and pre-tax charges of $275 million related to the 2020 Zogg fire, partially offset by $219 million of probable insurance recoveries in 2020. The Utility recognized charges of $11.4 billion in 2019, for wildfire-related claims primarily associated with the 2018 Camp fire and 2017 Northern California wildfires.

See Item 1A. Risk Factors and Note 14 of the Notes to the Consolidated Financial Statements in Item 8.

### Wildfire Fund Expense

Wildfire fund expense that impacted earnings increased by $104 million, or 25%, in 2021 compared to 2020. Due to the Chapter 11 Cases, the Utility’s participation in the Wildfire Fund was limited to 40% for the period from July 12, 2019 to June 30, 2020. Additionally, the Utility recorded $43 million of accelerated amortization as a result of the Wildfire Fund receivable accrued in relation to the 2021 Dixie fire.

Wildfire fund expense that impacted earnings increased by $413 million, or 100%, in 2020 compared to 2019. In 2020, the Utility became eligible to participate in the Wildfire Fund and as a result recorded amortization and accretion expense related to the Wildfire Fund coverage received from the effective date of AB 1054 through December 31, 2020.

See Notes 3 and 14 of the Notes to the Consolidated Financial Statements in Item 8.

### Depreciation, Amortization, and Decommissioning

The Utility’s depreciation, amortization, and decommissioning expenses decreased by $66 million, or 2%, in 2021 compared to 2020, primarily due to a reduction in decommissioning expense that was recorded as a result of the final 2018 Nuclear Decommissioning Cost Triennial Proceeding decision.

The Utility’s depreciation, amortization, and decommissioning expenses increased by $236 million, or 7%, in 2020 compared to 2019, primarily due to capital additions and an increase in depreciation rates associated with the TO20 decision.

### Interest Income

The Utility’s interest income that impacted earnings decreased by $17 million, or 44%, in 2021 compared to 2020. Interest income decreased by $43 million, or 52%, in 2020 compared to 2019. The Utility’s interest income is primarily affected by changes in regulatory balancing accounts and changes in interest rates.

### Interest Expense

Interest expense that impacted earnings increased by $262 million, or 24%, in 2021 compared to 2020, primarily due to the issuance of additional long-term debt.

The Utility’s interest expense that impacted earnings increased by $199 million, or 22%, in 2020 compared to 2019, primarily due to the issuance of new debt in 2020 in connection with the emergence from Chapter 11.

### Other Income, Net

Changes to Other income, net that impact earnings are primarily driven by fluctuations in the balance of construction work in progress that impact equity AFUDC.

### Reorganization Items, Net

Reorganization items, net that impacted earnings decreased by $298 million, or 96%, in 2021 compared to 2020, primarily due to the Utility’s emergence from the Chapter 11 Cases on July 1, 2020.

There was no material change to reorganization items, net that impacted earnings in 2020 compared to 2019.

### Income Tax Provision (Benefit)

Income tax expense increased by $492 million in 2021 compared to 2020, primarily due to a DTA write-off associated with the grantor trust election for the Fire Victim Trust in 2021, as compared to a smaller DTA write-off associated with the decline in value of PG&E Corporation common stock contributed into a Fire Victim Trust in the same period in 2020.

The Utility’s income tax benefit increased by $3.8 billion in 2020 compared to 2019, primarily due to a pre-tax loss in 2019 compared to pre-tax income in 2020. Additionally, there was a $619 million adjustment from the measurement of the DTA associated with the difference between the liability recorded related to the TCC RSA and the ultimate value of PG&E Corporation stock contributed to the Fire Victim Trust in 2020.

The following table reconciles the income tax expense at the federal statutory rate to the income tax provision:

|  | 2021 | 2020 | 2019 |
| --- | ---: | ---: | ---: |
| Federal statutory income tax rate | 21.0% | 21.0% | 21.0% |
| Increase (decrease) in income tax rate resulting from: |  |  |  |
| State income tax (net of federal benefit) (1) | 24.1% | 19.1% | 7.5% |
| Effect of regulatory treatment of fixed asset differences (2) | (51.6)% | (44.9)% | 2.8% |
| Tax credits | (1.2)% | (1.7)% | 0.1% |
| Fire Victim Trust (3) | 91.9% | 51.7% | —% |
| Bankruptcy and emergence | —% | 2.4% | —% |
| Other, net (4) | 2.6% | 2.2% | (0.5)% |
| **Effective tax rate** | **86.8%** | **49.8%** | **30.9%** |

(1) Includes the effect of state flow-through ratemaking treatment and the effect of the grantor trust election.

(2) Includes the effect of federal flow-through ratemaking treatment for certain property-related costs. For these temporary tax differences, PG&E Corporation and the Utility recognize the deferred tax impact in the current period and record offsetting regulatory assets and liabilities. Therefore, PG&E Corporation’s and the Utility’s effective tax rates are impacted as these differences arise and reverse. PG&E Corporation and the Utility recognize such differences as regulatory assets or liabilities as it is probable that these amounts will be recovered from or returned to customers in future rates. In 2021 and 2020, the amounts also reflect the impact of the amortization of excess deferred tax benefits to be refunded to customers as a result of the Tax Act passed in December 2017.

(3) Includes the effect of the grantor trust election as discussed in Note 6 of the Notes to the Consolidated Financial Statements in Item 8.

(4) These amounts primarily represent the impact of tax audit settlements and non-tax deductible penalty costs in 2021 and 2020.

### Utility Revenues and Costs that did not Impact Earnings

Fluctuations in revenues that did not impact earnings are primarily driven by procurement costs. See below for more information.

### Cost of Electricity

The Utility’s cost of electricity includes the cost of power purchased from third parties (including renewable energy resources), fuel and associated transmission costs used in its own generation facilities, fuel and associated transmission costs supplied to other facilities under power purchase agreements, costs to comply with California’s cap-and-trade program, and realized gains and losses on price risk management activities. Cost of electricity also includes net sales (Utility owned generation and third parties) in the CAISO electricity markets. See Note 10 of the Notes to the Consolidated Financial Statements in Item 8. The Utility’s total purchased power is driven by customer demand, net CAISO electricity market activities (purchases or sales), the availability of the Utility’s own generation facilities (including Diablo Canyon and its hydroelectric plants), and the cost-effectiveness of each source of electricity.

*(in millions)*

|  | 2021 | 2020 | 2019 |
| --- | ---: | ---: | ---: |
| Cost of purchased power, net | $2,883 | $2,854 | $2,809 |
| Fuel used in own generation facilities | 349 | 262 | 286 |
| **Total cost of electricity** | **$3,232** | **$3,116** | **$3,095** |

### Cost of Natural Gas

The Utility’s cost of natural gas includes the costs of procurement, storage and transportation of natural gas, costs to comply with California’s cap-and-trade program, and realized gains and losses on price risk management activities. See Note 10 of the Notes to the Consolidated Financial Statements in Item 8. The Utility’s cost of natural gas is impacted by the market price of natural gas, changes in the cost of storage and transportation, and changes in customer demand.

*(in millions)*

|  | 2021 | 2020 | 2019 |
| --- | ---: | ---: | ---: |
| Cost of natural gas sold | $1,010 | $648 | $622 |
| Transportation cost of natural gas sold | 139 | 134 | 112 |
| **Total cost of natural gas** | **$1,149** | **$782** | **$734** |

72

### Operating and Maintenance Expenses

The Utility’s operating expenses that did not impact earnings include certain costs that the Utility is authorized to recover as incurred. If the Utility were to spend more than authorized amounts, these expenses could have an impact to earnings.

### Other Income, Net

The Utility’s other income, net that did not impact earnings includes pension and other post-retirement benefit costs that fluctuate primarily from market and interest rate changes.

### LIQUIDITY AND FINANCIAL RESOURCES

### Overview

The Utility’s ability to fund operations, finance capital expenditures, make scheduled principal and interest payments, and make distributions to PG&E Corporation depends on the levels of its operating cash flows and access to the capital and credit markets. The CPUC authorizes the Utility’s capital structure, the aggregate amount of long-term and short-term debt that the Utility may issue, and the revenue requirements the Utility is able to collect to recover its cost of capital. The Utility generally utilizes retained earnings, equity contributions from PG&E Corporation and long-term debt issuances to maintain its CPUC-authorized long-term capital structure consisting of 52% equity and 48% debt and preferred stock and relies on short-term debt, including its revolving credit facilities, to fund temporary financing needs. On May 28, 2020, the CPUC approved a final decision in the Chapter 11 Proceedings OII, which, among other things, grants the Utility a temporary, five-year waiver from compliance with its authorized capital structure for the financing in place upon the Utility’s emergence from Chapter 11.

PG&E Corporation’s ability to fund operations, make scheduled principal and interest payments, and fund equity contributions to the Utility depends on the level of cash on hand, cash received from the Utility, and PG&E Corporation’s access to the capital and credit markets.

PG&E Corporation’s and the Utility’s credit ratings may be affected by the ultimate outcome of pending enforcement and litigation matters. Credit rating downgrades may impact the cost and availability of short-term borrowings, including credit facilities, and long-term debt costs. In addition, some of the Utility’s commodity contracts contain collateral posting provisions tied to the Utility’s credit rating from each of the major credit rating agencies. The collateral posting provisions for some of the Utility’s power and natural gas commodity, and transportation and service agreements state that if the Utility’s credit ratings were to fall below investment grade, the Utility would be required to post additional cash immediately to fully collateralize some or all of its net liability positions. The Utility’s credit ratings fell below investment grade in January 2019, at which time the Utility was required to post additional collateral under its commodity purchase agreements. A further downgrade would not materially impact the collateral postings for procurement activity. See Note 10 of the Notes to the Consolidated Financial Statements in Item 8.

PG&E Corporation and the Utility have various contractual commitments which impact cash requirements. These commitments are discussed in “Recognition of Lease Assets and Liabilities” in Note 3, Note 5, Note 12, and “Purchase Commitments” in Note 15 of the Notes to the Consolidated Financial Statements in Item 8.

### COVID-19

PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows have been and could continue to be significantly affected by the outbreak of the COVID-19 pandemic. The outbreak of the COVID-19 pandemic, the emergence of variant strains of the virus (including Delta and Omicron), and the resulting economic conditions and government orders have had and will continue to have a significant adverse impact on the Utility’s customers and, as a result, these circumstances have impacted and will continue to impact the Utility for an indeterminate period of time. The principal areas of near-term impact include liquidity, financial results and business operations, stemming primarily from the ongoing economic hardship of the Utility’s customers, the moratorium on service disconnections for residential and small business customers and for eligible medium and large commercial and industrial customers that expired on September 30, 2021, the CPUC’s “Emergency Authorization and Order Directing Utilities to Implement Emergency Customer COVID-19 Protections” and an observed reduction in non-residential electrical load. The Utility’s accounts receivable balances over 30 days outstanding as of December 31, 2021, were approximately $1.1 billion, or $832 million higher as compared to the balance as of December 31, 2019. The Utility is unable to estimate the portion of the increase directly attributable to the COVID-19 pandemic. The Utility expects to continue experiencing an impact on monthly cash collections for as long as current COVID-19 circumstances persist.

On April 16, 2020, the CPUC adopted a resolution ordering utilities to implement a number of emergency customer protections, including a moratorium on service disconnections for residential and small business customers, beginning on March 4, 2020, which it subsequently extended through June 30, 2021. The CPUC authorized utilities to establish memorandum accounts to track incremental costs associated with complying with the resolution. On April 19, 2021, the CPUC issued a final decision to implement a temporary moratorium on service disconnection for medium and large commercial and industrial customers. Although the moratorium on service disconnections ended on September 30, 2021, the Utility does not anticipate resuming service disconnections until 2022. If the moratorium on service disconnections were to be reinstated, it could have a material impact on results of operations, financial condition, and cash flows of PG&E Corporation and the Utility.

Although the Utility is seeking further regulatory relief to mitigate the impact of the consequences of the COVID-19 pandemic, there can be no assurance as to the amount or timing of such relief. On July 16, 2021, the California governor signed into law AB 135, which provides financing assistance to customer accounts in arrears. See “Assembly Bill 135” below for more information. AB 135 allocates roughly $300 million in relief funding to the Utility’s customers and the amount was paid on January 27, 2022.

As of December 31, 2021, PG&E Corporation and the Utility had access to approximately $2.2 billion of total liquidity comprised of approximately $165 million of Utility cash, $126 million of PG&E Corporation cash and $1.9 billion of availability under PG&E Corporation’s and the Utility’s revolving credit facilities. The 2022 cost of capital application was filed off-cycle based on the extraordinary event of the COVID-19 pandemic and related government response. See “Cost of Capital Proceedings” below for more information.

The Utility has established the CPPMA memorandum accounts for tracking costs related to the CPUC’s emergency authorization and order, which, as of December 31, 2021, totaled $49 million and is reflected in Long-term regulatory assets on the Consolidated Balance Sheets. In addition to the $49 million recorded to the CPPMA that is subject to CPUC approval, the Utility has recorded approximately $127 million of undercollections from residential customers from June 11, 2020 to December 31, 2021 to the RUBA, which has been approved by the CPUC and is reflected in Regulatory balancing accounts receivable on the Consolidated Balance Sheets. During the quarter ended December 31, 2021, there was an adjustment to the RUBA current balancing accounts receivable of $180 million as a result of the expected CAPP funding, which was received on January 27, 2022. For more information on the impact of the COVID-19 pandemic on PG&E Corporation and the Utility, see “PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows have been and could continue to be significantly affected by the outbreak of the COVID-19 pandemic” in Item 1A. Risk Factors in Part I of this 2021 Form 10-K.

The COVID-19 pandemic may continue to impact PG&E Corporation and the Utility financially, and PG&E Corporation and the Utility will continue to monitor the overall impact of the COVID-19 pandemic.

### Cash and Cash Equivalents

Cash and cash equivalents consist of cash and short-term, highly liquid investments with original maturities of three months or less. PG&E Corporation and the Utility maintain separate bank accounts and primarily invest their cash in money market funds.

### Financial Resources

### Equity Financings

On April 30, 2021, PG&E Corporation entered into an Equity Distribution Agreement with the Agents, the Forward Sellers and the Forward Purchasers (each as defined in “At the Market Equity Distribution Program” in Note 6 of the Notes to the Consolidated Financial Statements in Item 8), establishing an at the market equity distribution program, pursuant to which PG&E Corporation, through the Agents, may offer and sell from time to time shares of PG&E Corporation’s common stock having an aggregate gross sales price of up to $400 million. The Equity Distribution Agreement provides that, in addition to the issuance and sale of shares of common stock by PG&E Corporation to or through the Agents, PG&E Corporation may enter into Forward Sale Agreements (as defined in “At the Market Equity Distribution Program” in Note 6 of the Notes to the Consolidated Financial Statements in Item 8) with the Forward Purchasers.

As of December 31, 2021, there was $400 million available under PG&E Corporation’s at the market equity distribution program for future offerings. During the year ended December 31, 2021, PG&E Corporation has not sold any shares pursuant to the Equity Distribution Agreement or any Forward Sale Agreement.

### Debt Financings

In March 2021, the Utility issued (i) $1.5 billion aggregate principal amount of 1.367% First Mortgage Bonds due March 10, 2023, (ii) $450 million aggregate principal amount of 3.25% First Mortgage Bonds due June 1, 2031, and (iii) $450 million aggregate principal amount of 4.20% First Mortgage Bonds due June 1, 2041. The proceeds were used for (i) the prepayment of all of the $1.5 billion 364-day term loan facility (maturing June 30, 2021) outstanding under the Utility Term Loan Credit Agreement, (ii) the repayment of all of the borrowings outstanding under the Utility’s revolving credit facility pursuant to the Utility Revolving Credit Agreement, and (iii) general corporate purposes.

In June 2021, the Utility issued $800 million aggregate principal amount of 3.0% First Mortgage Bonds due June 15, 2028. The proceeds were used for general corporate purposes, including the repayment of borrowings under the Utility’s revolving credit facility pursuant to the Utility Revolving Credit Agreement.

On November 15, 2021, the Utility completed the sale of (i) $300 million aggregate principal amount of Floating Rate First Mortgage Bonds due November 14, 2022, (ii) $900 million aggregate principal amount of 1.70% First Mortgage Bonds due November 15, 2023 and (iii) an additional $550 million aggregate principal amount of 3.25% First Mortgage Bonds due June 1, 2031 (the “2031 Bonds”). The 2031 Bonds are part of the same series of debt securities issued by the Utility in March 2021. The proceeds were used for the repayment of the $1.45 billion aggregate principal amount of the Utility’s Floating Rate First Mortgage Bonds due November 15, 2021. The Utility used the remaining net proceeds for general corporate purposes, including the repayment of approximately $300 million of borrowings outstanding under the Utility’s revolving credit facility pursuant to the Utility Revolving Credit Agreement.

For more information, see “Recovery Bonds” below and “Long-Term Debt” in Note 5 of the Notes to the Consolidated Financial Statements in Item 8.

### Credit Facilities

As of December 31, 2021, PG&E Corporation and the Utility had $500 million and $1.4 billion available under their respective $500 million and $6.4 billion credit facilities, including the Utility’s term loan credit facility and Receivables Securitization Program. The amount the Utility may borrow under the Receivables Securitization Program is limited to the lesser of the facility limit and the facility availability. The facility availability may vary based on the amount of accounts receivable that the Utility owns that are eligible for sale to the SPV and the portion of those accounts receivable that are sold to the SPV that are eligible for advances by the lenders under the Receivables Securitization Program from time to time.

For more information, see “Credit Facilities” in Note 5 of the Notes to the Consolidated Financial Statements in Item 8.

### Intercompany Note Payable

On August 11, 2021, PG&E Corporation borrowed $145 million from the Utility under an interest bearing 364-day intercompany note due August 10, 2022. The intercompany note includes usual and customary provisions for notes of this type. The interest rate on the loan is a variable rate equal to the interest rate applicable to loans under the Corporation Revolving Credit Agreement. Interest is due on the last business day of each month, commencing on August 31, 2021. The proceeds were borrowed to fund debt service obligations of PG&E Corporation. As of December 31, 2021, the intercompany note is reflected in Accounts receivable - other on the Utility’s Consolidated Balance Sheet and is eliminated upon consolidation of PG&E Corporation’s Consolidated Balance Sheet.

### Recovery Bonds

On November 12, 2021, PG&E Recovery Funding LLC, a bankruptcy remote, limited liability company wholly owned by the Utility, issued approximately $860 million of senior secured recovery bonds. The recovery bonds were issued in three tranches: (1) approximately $266 million with an interest rate of 1.46% and is due July 15, 2033, (2) approximately $160 million with an interest rate of 2.28% and is due January 15, 2038, and (3) approximately $434 million with an interest rate of 2.82% and is due July 15, 2048. The net proceeds were used to fund fire risk mitigation capital expenditures that have been incurred by the Utility and incurred by PG&E Corporation on behalf of the Utility in 2020 and 2021.

For more information, see “AB 1054” in Note 5 of the Notes to the Consolidated Financial Statements in Item 8.

### Dividends

On December 20, 2017, the Boards of Directors of PG&E Corporation and the Utility suspended quarterly cash dividends on both PG&E Corporation’s and the Utility’s common stock, beginning the fourth quarter of 2017, as well as the Utility’s preferred stock, beginning the three-month period ending January 31, 2018.

On March 20, 2020, PG&E Corporation and the Utility filed a motion with the Bankruptcy Court that includes a dividend restriction for PG&E Corporation. According to the dividend restriction, PG&E Corporation “will not pay common dividends until it has recognized $6.2 billion in non-GAAP core earnings following the Effective Date” of the Plan. The Bankruptcy Court entered the order approving the motion on April 9, 2020.

In addition, the Corporation Revolving Credit Agreement requires that PG&E Corporation (1) maintain a ratio of total consolidated debt to consolidated capitalization of no greater than 70% as of the end of each fiscal quarter and (2) if revolving loans are outstanding as of the end of a fiscal quarter, a ratio of adjusted cash to fixed charges, as of the end of such fiscal quarter, of at least 150% prior to the date that PG&E Corporation first declares a cash dividend on its common stock and at least 100% thereafter.

Under the Utility’s Articles of Incorporation, the Utility cannot pay common stock dividends unless all cumulative preferred dividends on the Utility’s preferred stock have been paid. As of January 31, 2022, there were $59.1 million of such cumulative and unpaid dividends on the Utility’s preferred stock. Additionally, the CPUC requires the Utility to maintain a capital structure composed of at least 52% equity on average. On May 28, 2020, the CPUC approved a final decision in the Chapter 11 Proceedings OII, which, among other things, grants the Utility a temporary, five-year waiver from compliance with its authorized capital structure for the financing in place upon the Utility’s emergence from Chapter 11.

Subject to the foregoing restrictions, any decision to declare and pay dividends in the future will be made at the discretion of the Boards of Directors and will depend on, among other things, results of operations, financial condition, cash requirements, contractual restrictions and other factors that the Boards of Directors may deem relevant. On February 8, 2022, the Board of Directors of the Utility authorized the payment of all cumulative and unpaid dividends on the Utility’s preferred stock as of January 31, 2022 totaling $59.1 million, payable on May 13, 2022, to holders of record on April 29, 2022 and declared a dividend on the Utility’s preferred stock totaling $3.5 million that will be accrued during the three-month period ending April 30, 2022, payable on May 15, 2022, to holders of record on April 29, 2022. It is uncertain as to when PG&E Corporation and the Utility will commence the payment of dividends on their common stock.

### Utility Cash Flows

The Utility’s cash flows were as follows:

*(in millions)*

|  | Year Ended December 31, 2021 | 2020 | 2019 |
| --- | ---: | ---: | ---: |
| Net cash provided by (used in) operating activities | $2,448 | $(19,047) | $4,810 |
| Net cash used in investing activities | (7,050) | (7,748) | (6,378) |
| Net cash provided by financing activities | 4,379 | 26,070 | 1,395 |
| **Net change in cash, cash equivalents, and restricted cash** | **$(223)** | **$(725)** | **$(173)** |

76

### Operating Activities

The Utility’s cash flows from operating activities primarily consist of receipts from customers less payments of operating expenses, other than expenses such as depreciation that do not require the use of cash. During 2021, net cash provided by operating activities increased by $21.5 billion compared to the same period in 2020. This increase was primarily due to the payment of $18.8 billion in satisfaction of pre-petition wildfire-related claims in 2020 as compared to the payment of $758 million to the Fire Victim Trust in 2021. Additionally, the Utility made initial and first annual contributions to the Wildfire Fund of $5.2 billion during the year ended December 31, 2020 as compared to the $193 million contribution made during the year ended December 31, 2021. Lastly, the Utility paid approximately $260 million more in interest in satisfaction of pre-petition claims during the year ended December 31, 2020 as compared to 2021. The increase was partially offset by wildfire-related insurance reimbursements of $2.2 billion received in 2020 as compared to $0.1 billion in 2021.

During 2020, net cash provided by operating activities decreased by $23.9 billion compared to 2019. This decrease was primarily due to the payment of $18.8 billion in satisfaction of pre-petition wildfire-related claims (including claims associated with the 2018 Camp fire, the 2017 Northern California wildfires, and the 2015 Butte fire), and the initial, first, and second annual contributions made to the Wildfire Fund of $5.2 billion, with no similar payments made in 2019.

Future cash flow from operating activities will be affected by various factors, including:

- the timing and amount of costs in connection with the 2019 Kincade fire, the 2020 Zogg fire, and the 2021 Dixie fire, and the timing and amount of any potential related insurance, Wildfire Fund, and regulatory recoveries;
- the timing and amounts of costs, including fines and penalties, that may be incurred in connection with current and future enforcement, litigation, and regulatory matters (see “Wildfire-Related Securities Class Action” in Note 14 and “Enforcement Matters” in Note 15 of the Notes to the Consolidated Financial Statements in Item 8 and “Regulatory Matters” below for more information);
- the severity, extent and duration of the global COVID-19 pandemic and its impact on the Utility’s service territory, the ability of the Utility to collect on its customer invoices, the ability of the Utility’s customers to pay their utility bills in full and in a timely manner, the ability of the Utility to offset these effects, including with spending reductions, and the ability of the Utility to recover through rates any losses incurred in connection with the COVID-19 pandemic, as well as the impact of the COVID-19 pandemic on the availability or cost of financing;
- the timing and amounts of available funds to pay eligible claims for liabilities arising from future wildfires;
- the timing and amount of substantially increasing costs in connection with 2020-2022 WMPs and the costs previously incurred in connection with the 2019 WMP that are not currently being recovered through rates (see “Regulatory Matters” below for more information);
- the timing and amount of premium payments related to wildfire insurance (see “Insurance Coverage” in Note 14 of the Notes to the Consolidated Financial Statements in Item 8 for more information);
- the timing of the gain to be returned to customers from the sale of the SFGO and transmission tower wireless licenses and the amounts incurred related to the move to and the leasing of the Lakeside Building; and
- the timing and outcomes of the Utility’s pending and future ratemaking and regulatory proceedings, including the extent to which PG&E Corporation and the Utility are able to recover their costs through regulated rates as recorded in memorandum accounts or balancing accounts, or as otherwise requested.

PG&E Corporation and the Utility do not have any off-balance sheet arrangements that have had, or are reasonably likely to have, a current or future material effect on their financial condition, changes in financial condition, revenues or expenses, results of operations, liquidity, capital expenditures, or capital resources, other than those discussed under “Purchase Commitments” in Note 15 of the Notes to the Consolidated Financial Statements in Item 8.

### Investing Activities

Net cash used in investing activities decreased by $698 million during 2021 as compared to the same period in 2020. The decrease was primarily due to the sale of the SFGO, which resulted in net proceeds received of $749 million in September 2021, with no similar receipts in 2020. See “Application to Sell General Office Complex” below for more information.

Net cash used in investing activities increased by $1.4 billion during 2020 as compared to 2019 partially due to the payment of pre-petition vendor payables for capital expenditures as a result of emerging from the Chapter 11 Cases. The Utility’s investing activities primarily consist of the construction of new and replacement facilities necessary to provide safe and reliable electricity and natural gas services to its customers. Cash used in investing activities also includes the proceeds from sales of nuclear decommissioning trust investments which are largely offset by the amount of cash used to purchase new nuclear decommissioning trust investments. The funds in the decommissioning trusts, along with accumulated earnings, are used exclusively for decommissioning and dismantling the Utility’s nuclear generation facilities.

Future cash flows used in investing activities are largely dependent on the timing and amount of capital expenditures. The Utility estimates that it will incur between $7.8 billion and $8.9 billion in 2022. Additionally, future cash flows used in investing activities will be impacted by the timing and amount related to the intended purchase of the Lakeside Building.

### Financing Activities

During 2021, net cash provided by financing activities decreased by $21.7 billion as compared to 2020. This decrease was primarily due to PG&E Corporation making a cash equity contribution to the Utility of approximately $13.0 billion in 2020, with no similar activity in 2021. Additionally, during 2021, the Utility issued approximately $3.3 billion less of long-term debt, net of repayments, as compared to the same period in 2020. In addition, the Utility had net borrowings of $4.6 billion under its credit facilities during the year ended December 31, 2020 as compared to net repayments of $246 million during the same period in 2021. The Utility had net borrowings of short-term debt of $1.4 billion during the year ended December 31, 2020, as compared to net repayments of short-term debt of $1.2 billion during the same period in 2021. The decrease was partially offset by $1.5 billion of net repayments of debtor-in-possession credit facilities in 2020, with no similar payments in 2021. Lastly, the Utility received $370 million of proceeds in 2021 in connection with the Transaction Agreement between the Utility and SBA, with no similar receipts in 2020. For more information, see “Sale of Transmission Tower Wireless Licenses” in Note 3 of the Notes to the Consolidated Financial Statements in Item 8.

During 2020, net cash provided by financing activities increased by $24.7 billion as compared to 2019. This increase was primarily due to PG&E Corporation making a cash equity contribution to the Utility of approximately $13.0 billion, and the Utility receiving $10.4 billion in proceeds from the issuance of short-term and long-term first mortgage bonds, with no similar activities in 2019. Additionally, the Utility had net borrowings of $4.6 billion under its credit facilities during the year ended December 31, 2020, with no similar activity in 2019 due to the Utility entering into the facilities in 2020. These increases were partially offset by net repayments of $1.5 billion on the debtor-in-possession facilities in 2020, as compared to net borrowings of $1.5 billion on the debtor-in-possession facilities in 2019.

Cash provided by or used in financing activities is driven by the Utility’s financing needs, which depend on the level of cash provided by or used in operating activities, the level of cash provided by or used in investing activities, the conditions in the capital markets, and the maturity date or prepayment date of existing debt instruments. Additionally, future cash flows from financing activities will be affected by the timing and outcome of the Utility’s applications for a post-emergence securitization transaction and for an AB 1054 securitization transaction. See “Application for Post-Emergence Securitization Transaction” and “Application for AB 1054 Securitization Transaction” below for more information.

### ENFORCEMENT AND LITIGATION MATTERS

PG&E Corporation and the Utility have significant contingencies arising from their operations, including contingencies related to the enforcement and litigation matters described in Notes 14 and 15 of the Notes to the Consolidated Financial Statements in Item 8. that are incorporated by reference herein. The outcome of these matters, individually or in the aggregate, could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows.

### U.S. District Court Matters and Probation

On August 9, 2016, the jury in the federal criminal trial against the Utility in the United States District Court for the Northern District of California, in San Francisco, found the Utility guilty on one count of obstructing a federal agency proceeding and five counts of violations of pipeline integrity management regulations of the Natural Gas Pipeline Safety Act. On January 26, 2017, the court imposed a sentence on the Utility in connection with the conviction. The court sentenced the Utility to a five-year corporate probation period, oversight by the Monitor for a period of five years, with the ability to apply for early termination after three years, a fine of $3 million to be paid to the federal government, certain advertising requirements, and community service.

In the course of 2021, the court entered numerous other orders, including in connection with the Utility’s vegetation management, the Utility’s PSPS program, the 2018 Camp fire, the 2019 Kincade fire, the 2020 Zogg fire and the 2021 Dixie fire.

On January 25, 2022, the period of probation expired and the Monitor’s oversight of the Utility ended.

### Enhanced Oversight and Enforcement Process

In the OII to Consider PG&E Corporation’s and the Utility’s Plan of Reorganization final decision, the CPUC adopted an EOEP designed to provide a roadmap for how the CPUC will monitor the Utility’s operational performance on an ongoing basis. The EOEP contains six steps that are triggered by specific events and includes enhanced reporting requirements and additional monitoring and oversight. These trigger events include failure to obtain an approved WMP, failure to comply with regulatory reporting requirements in the WMP, insufficient progress toward approved safety or risk-driven investments and failure to comply with or demonstrate sufficient progress toward certain metrics (some of which will be determined in an ongoing regulatory proceeding). The EOEP also contains provisions for the Utility to cure and permanently exit the EOEP if it can satisfy specific criteria. If the Utility is placed into the EOEP, actions taken would occur in coordination with the CPUC’s existing formal and informal reporting requirements and procedures. The EOEP does not replace or limit the CPUC’s regulatory authority, including the authority to issue Orders to Show Cause and Orders Instituting Investigations and to impose fines and penalties. The EOEP requires the Utility to report the occurrence of a triggering event to the CPUC’s executive director no later than five business days after the date on which any member of senior management of the Utility becomes aware of the occurrence of a triggering event.

The Utility is unable to predict whether additional fines or penalties may be imposed, or other regulatory actions may be taken.

On August 18, 2021, the President of the CPUC informed the Utility that the CPUC staff intends to conduct a fact-finding review regarding a pattern of self-reported missed inspections and other self-reported safety incidents to determine whether a recommendation to advance the Utility further within the EOEP is warranted.

#### Vegetation Management

The CPUC placed the Utility into step 1 of the EOEP on April 15, 2021 and imposed additional reporting requirements on the Utility. The CPUC’s resolution states that a step 1 triggering event had occurred because the Utility “has made insufficient progress toward approved safety or risk-driven investments related to its electric business.” The resolution finds that, based on the CPUC’s evaluation of the Utility’s EVM work in 2020, the Utility “is not sufficiently prioritizing its Enhanced Vegetation Management (“EVM”) based on risk” and “is not making risk-driven investments.” The resolution also finds that “less than five percent of the EVM work” the Utility completed in 2020 “was on the 20 highest risk power lines according to \[its\] own risk rankings.”

As required by the CPUC’s resolution, the Utility submitted a corrective action plan to the CPUC’s Executive Director on May 6, 2021, which is designed to correct or prevent recurrence of the step 1 triggering event, or otherwise mitigate any ongoing safety risk or impact, as soon as practicable, among other things. The corrective action plan addresses the EVM situation that occurred in 2020 and provides a risk-informed EVM workplan for 2021. The Utility is required to update the information contained in the corrective action plan every 90 days. The Utility will remain in step 1 of the EOEP until the CPUC determines that the Utility has met the conditions of the corrective action plan. If the Utility does not adequately meet such conditions within the timeframe approved by the CPUC, the CPUC may place the Utility into a higher step of the EOEP, or the Utility may remain in step 1 of the EOEP if it demonstrates sufficient progress towards meeting such conditions.

The Utility is unable to predict the outcome of this regulatory process.

### Order Instituting an Investigation into PG&E Corporation’s and the Utility’s Safety Culture

On August 27, 2015, the CPUC began a formal investigation into whether the organizational culture and governance of PG&E Corporation and the Utility prioritize safety and adequately direct resources to promote accountability and achieve safety goals and standards (the “Safety Culture OII”). The CPUC directed the SED to evaluate the Utility’s and PG&E Corporation’s organizational culture, governance, policies, practices, and accountability metrics in relation to the Utility’s record of operations, including its record of safety incidents.

On June 18, 2019, the CPUC issued a ruling requesting comments from parties on four proposals that it stated may improve the safety culture of PG&E Corporation and the Utility. The four proposals are: separating the Utility into gas and electric utilities (including, as one possibility, sale of the gas assets to a third party); establishing periodic review of the Utility’s certificate of convenience and necessity; modifying or eliminating PG&E Corporation’s holding company structure; and linking the Utility’s rate of return or ROE to safety performance metrics.

On September 4, 2020, the administrative law judge issued a ruling updating case status, which states that the proceeding will remain open as a vehicle to monitor the progress of the Utility in improving its safety culture, and to address any relevant issues that arise, with the CPUC’s consultant NorthStar Consulting Group, Inc. continuing in a monitoring role. The ruling states that additional issues may be raised in the proceedings by parties or the CPUC.

### REGULATORY MATTERS

The Utility is subject to substantial regulation by the CPUC, the FERC, the NRC, and other federal and state regulatory agencies. The resolutions of the proceedings described below and other proceedings may materially affect PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows.

During 2021, the Utility continued to make progress on regulatory matters.

- In June, the Utility filed its 2023 GRC application. The application requests a revenue requirement of $15.46 billion for the 2023 test year.
- In August, the CPUC approved the Utility’s agreement to sell the SFGO. In September, the sale closed.
- In September, OEIS issued a final decision statement approving the Utility’s 2021 WMP, and in October the CPUC ratified the OEIS’ approval.
- In September, the Utility filed a motion seeking CPUC approval of a settlement agreement for its 2020 WMCE application. Under the settlement agreement, the Utility would recover a revenue requirement of $1.04 billion, or 81% of the requested $1.28 billion.
- In September, the Utility filed its 2021 WMCE application, requesting cost recovery of approximately $1.6 billion of recorded expenditures related to wildfire mitigation, certain catastrophic events, and a number of other activities, resulting in a proposed revenue requirement of approximately $1.47 billion.
- In October, the CPUC approved the settlement agreement among the Utility and other parties that authorizes the Utility to recover $445.5 million in incremental insurance costs in its WEMA that were incurred for the period of July 26, 2017 through December 31, 2019.
- In November, the Utility filed a motion seeking CPUC approval of a settlement agreement for its 2018 CEMA application. Under the settlement agreement, the Utility would recover approximately $683 million plus interest, compared to the requested $763 million.

In addition, on January 31, 2022, the OEIS issued the Utility’s 2021 safety certification, which will be valid for 12 months or until a timely request for a new safety certification is acted upon, whichever occurs later.

### Cost Recovery Proceedings

Periodically, costs arise that could not have been anticipated by the Utility during CPUC GRC rate requests or that have been deliberately excluded therefrom. These costs may result from catastrophic events, changes in regulation, or extraordinary changes in operating practices. The Utility may seek authority to track incremental costs in a memorandum account and the CPUC may authorize recovery of costs tracked in memorandum accounts if the costs are deemed incremental and prudently incurred. The CPUC also authorized balancing accounts with limitations or caps to cost recovery. These accounts, which include the CEMA, WEMA, FHPMA, FRMMA, WMPMA, VMBA, WMBA, and RTBA among others, allow the Utility to track the costs associated with work related to disaster and wildfire response, other wildfire prevention-related costs, certain third-party wildfire claims, and insurance costs. While the Utility generally expects such costs to be recoverable, there can be no assurance that the CPUC will authorize the Utility to recover the full amount of its costs.

In recent years, the amount of the costs recorded in these accounts has increased. As of December 31, 2021, the Utility had recorded an aggregate amount of approximately $5.4 billion in costs not otherwise being recovered in existing revenue requirements, if any, for the CEMA, WEMA, FHPMA, FRMMA, WMPMA, VMBA, WMBA, MGMA, and RTBA. Because rate recovery may require CPUC authorization for these accounts, there is a delay between when the Utility incurs costs and when it may recover those costs.

If the amount of the costs recorded in these accounts continues to increase, the delay between incurring and recovering costs lengthens, or the Utility does not recover the full amount of its costs, PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected.

Except as otherwise noted, the Utility is unable to predict the timing and outcome of the following applications. PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected if the Utility is unable to timely recover costs included in these applications.

For more information, see Note 4 of the Notes to the Consolidated Financial Statements in Item 8., “Regulatory Matters - Wildfire Mitigation and Catastrophic Events Costs Recovery Applications,” “Regulatory Matters - Application for Recovery of Costs Recorded in the Wildfire Expense Memorandum Account,” and “Regulatory Matters - Catastrophic Event Memorandum Accounts and Applications” below.

### Wildfire Mitigation and Catastrophic Events Cost Recovery Applications

#### 2020 WMCE Application

On September 30, 2020, the Utility filed an application with the CPUC requesting cost recovery of recorded expenditures related to wildfire mitigation and certain catastrophic events (the “2020 WMCE application”). The recorded expenditures, which exclude amounts disallowed as a result of the CPUC’s decision in the OII into the 2017 Northern California wildfires and the 2018 Camp fire, consist of $1.18 billion in expense and $801 million in capital expenditures, resulting in a proposed revenue requirement of approximately $1.28 billion.

The costs addressed in the 2020 WMCE application cover activities mainly during the years 2017 to 2019 and are incremental to those previously authorized in the Utility’s 2017 GRC and other proceedings. The Utility’s request includes amounts from the FHPMA of $293 million, the FRMMA and the WMPMA of $740 million, and the CEMA of $251 million.

Given the CPUC’s prior approval of $447 million in interim rate relief (which includes interest), the Utility proposed to recover the remaining $868 million revenue requirement over a one-year period (following the conclusion of interim rate relief recovery). Cost recovery requested in this application is subject to the CPUC’s reasonableness review, which could result in some or all of the interim rate relief being subject to refund.

On September 21, 2021, the Utility and certain parties filed a motion with the CPUC seeking approval of a settlement agreement that would resolve all of the issues raised by the settling parties in the 2020 WMCE application. The settlement agreement proposes that the Utility recover a revenue requirement of $1.04 billion. The settlement agreement would authorize the Utility to continue to recover the interim revenue requirement of $447 million over a 17-month amortization period, followed by an additional revenue requirement of $591 million over a 24-month amortization period. On September 23, 2021, the CPUC extended the statutory deadline for a PD in this matter to April 1, 2022.

#### 2021 WMCE Application

On September 16, 2021, the Utility filed an application with the CPUC requesting cost recovery of approximately $1.6 billion of recorded expenditures, resulting in a proposed revenue requirement of approximately $1.47 billion (the “2021 WMCE application”). The costs addressed in this application reflect costs related to wildfire mitigation and certain catastrophic events, as well as implementation of various customer-focused initiatives. These costs were incurred primarily in 2020.

The recorded expenditures consist of $1.4 billion in expenses and $197 million in capital expenditures. The costs addressed in the 2021 WMCE application are incremental to those previously authorized in the Utility’s 2017 GRC, 2020 GRC, and other proceedings. The majority of the Utility’s proposed revenue requirement would be collected over a two-year period starting in January 2023.

The Utility’s requested revenue requirement includes amounts recorded to the VMBA of $592 million, the CEMA of $535 million, the WMBA of $149 million, and other memo accounts. On November 18, 2021, the Utility filed updates to the application, increasing total costs by $19.4 million. On December 30, 2021, the Utility filed supplemental testimony reducing the cost recovery ask of the COVID-19 CEMA costs by $12.2 million. The $12.2 million reduction is a result of identified avoided costs, such as employee business travel expenses and in-person training costs, due to the pandemic.

The scoping memo shows a schedule with the CPUC issuing a PD in the fourth quarter of 2022.

### Wildfire Expense Memorandum Account Application

On February 7, 2020, the Utility filed an application requesting cost recovery of $499 million of insurance premiums paid by the Utility between July 26, 2017 through December 31, 2019, which were recorded in the WEMA. These costs are incremental to the insurance costs authorized in the 2017 GRC. These incremental costs are not associated with any specific wildfire event. The application does not seek recovery of wildfire claims or associated legal costs eligible for recording to the WEMA. On October 21, 2021, the CPUC adopted a final decision approving a settlement agreement among the Utility and the other active parties that authorizes the Utility to recover $445.5 million over a 12-month period beginning January 1, 2022.

### Catastrophic Event Memorandum Account Application

The CPUC allows utilities to recover the reasonable, incremental costs of responding to catastrophic events that have been declared a disaster or state of emergency by competent federal or state authorities. The Utility has historically sought such costs through standalone CEMA applications. More recently, the Utility has sought CEMA-eligible costs through its WMCE applications.

In addition to the Utility’s responsibilities in responding to catastrophic events, in 2014, the CPUC directed the Utility to perform additional fire prevention and vegetation management work in response to the severe drought in California. Through 2019, the costs associated with this work were tracked in the CEMA. In the 2020 GRC decision, the CPUC required the Utility to track these costs in the VMBA beginning January 1, 2020.

#### 2018 CEMA Application

On March 30, 2018, the Utility submitted to the CPUC its 2018 CEMA application requesting cost recovery of $183 million in connection with seven catastrophic events that included fire and storm declared emergencies from mid-2016 through early 2017, as well as $405 million related to work performed in 2016 and 2017 to cut back or remove dead or dying trees that were exposed to years of drought conditions and bark beetle infestation. The Utility filed three revisions to this application, resulting in a total cost recovery request of $763 million.

On April 25, 2019, the CPUC approved the Utility’s request for interim rate relief, allowing for recovery of $373 million of costs as requested by the Utility at that time. The interim rate relief was implemented, commencing on October 1, 2019. Costs included in the interim rate relief are subject to audit and refund.

On November 2, 2021, the Utility filed with the CPUC a settlement agreement with the active parties in the matter. The settlement agreement, if approved by the CPUC, would authorize the Utility to collect a total of $683 million plus interest for the 2018 CEMA application. As noted above, $373 million of the total amount has already been collected in interim rates. The interim rates would become final and no longer subject to refund. The remainder of the authorized revenue requirement that has yet to be collected would be amortized over a 12-month period.

### Forward-Looking Rate Cases

The Utility routinely participates in forward-looking rate case applications before the CPUC and the FERC. Those applications include GRCs, where the revenue required for general operations (“base revenue”) of the Utility is assessed and reset. In addition, the Utility is periodically involved in proceedings to adjust its regulated return on rate base.

Decisions in GRC proceedings are generally expected prior to the commencement of the period to which the rates would apply. However, delayed decisions in the Utility’s GRCs may cause the Utility to develop its budgets based on possible outcomes, rather than authorized amounts. When decisions are delayed, the CPUC typically provides rate relief to the Utility effective as of the commencement of the rate case period (not effective as of the date of the delayed decision). Nonetheless, the Utility’s spending during the period of the delay may exceed the authorized amount, without an ability for the Utility to seek cost recovery of such excess. If the Utility’s spending during the period of the delay is less than the authorized amount, the Utility could be exposed to operational and financial risk associated with the lower level of work achieved compared to that funded by the CPUC.

Except as otherwise noted, the Utility is unable to predict the timing and outcome of the following applications. PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected depending on the outcomes of these applications.

The Utility’s rate cases that are pending, have pending appeals, or were completed in 2021 are summarized in the following table:

| Rate Case | Request | Status |
| --- | --- | --- |
| 2023 GRC | Revenue requirement of $15.28 billion for 2023 | Filed June 2021. A decision on the initial track of the proceeding is expected in the second quarter of 2023. |
| 2019 GT&S | Removal of $39.4 million of disallowance | Approved January 2022. |
| 2022 Cost of Capital | Leave cost of capital components at pre-2022 levels for 2022 | Filed August 2021. Briefing is expected to be completed by March 2022. |
| 2015 GT&S | Revenue requirement of $416 million | Settlement agreement to recover $356 million of revenue requirement filed July 2021. |

### 2023 General Rate Case

On June 30, 2021, the Utility filed its 2023 GRC application with the CPUC. The 2023 GRC combined what had historically been separated into the GRC and GT&S rate cases. In the 2023 GRC, the CPUC will determine the annual amount of base revenues that the Utility will be authorized to collect from customers from 2023 through 2026 to recover its anticipated costs for gas distribution, gas transmission and storage, electric distribution, and electric generation and to provide the Utility an opportunity to earn its authorized rate of return. The Utility’s revenue requirements for other portions of its operations, such as electric transmission, and electricity and natural gas purchases, are authorized in other regulatory proceedings overseen by the CPUC or the FERC.

In a GRC, the CPUC approves annual revenue requirements for the first year (a “test year”) of the GRC period and typically authorizes the Utility to receive annual increases in revenue requirements for the subsequent years of the GRC period (known as “attrition years”). For its 2023 test year, the Utility has requested revenue requirements of $15.46 billion, an increase of $3.56 billion over the adopted 2020 GRC and 2019 GT&S revenue requirements for 2022 of $11.90 billion. The GRC application further states that the Utility’s requested 2023 revenue requirements represent a 9.6% increase over its total revenue requirements for 2022 (including both amounts that are authorized and that are requested outside of the GRC and remain subject to the regulatory process). The requested weighted-average GRC rate base for 2023 is approximately $48.52 billion, which corresponds to an increase of $9.35 billion over the authorized rate base for 2022 of $39.17 billion. The Utility also requested that the CPUC establish a ratemaking mechanism that would increase the Utility’s authorized GRC revenues in 2024, 2025, and 2026 by $930 million, $590 million, and $381 million, respectively. The Utility estimated its proposed revenue requirements for 2024, 2025, and 2026 would result in revenue requirement increases of 2.4%, 1.9%, and 1.5%, compared to its total estimated revenue requirements for 2023, 2024, and 2025, respectively. Over the 2023-2026 GRC period, the Utility plans to make average annual capital investments of approximately $7.75 billion in gas distribution, transmission and storage, electric distribution, and electric generation infrastructure, and to improve safety, reliability, and customer service.

The following table compares the Utility’s initial requested revenue requirements for 2023 with the comparable revenue requirements currently authorized for 2022, by both line of business and cost category:

*(in millions)*

| Line of Business (1) | Amounts requested in the 2023 GRC application | Amounts currently authorized for 2022 (2) | Requested increase compared to currently authorized amounts |
| --- | ---: | ---: | ---: |
| Gas distribution | $2,870 | $2,321 | $550 |
| Gas transmission and storage | 1,989 | 1,662 | 327 |
| Electric distribution | 8,171 | 5,514 | 2,657 |
| Electric generation | 2,431 | 2,404 | 26 |
| **Total revenue requirements** | **$15,461** | **$11,901** | **$3,560** |

(1) May not sum due to rounding.

(2) These amounts include revenues from Decision (“D.”) 20-12-005 (the Utility’s 2020 GRC), D.19-09-025 (the Utility’s 2019 GT&S) adjusted for D.19-12-056 and Advice Letter (“AL”) 4275-G/5887-E (Cost of Capital changes adopted for Long Term Debt and Common Stock) and AL 4367-G/6062-E (Excess Accumulated Deferred Income Taxes Pursuant to the 2017 Tax Act). Also included are the 2022 adopted revenue requirements associated with the following previously separately-funded projects: AL 5322-E (Energy Storage), D.16-12-065 (Electric Vehicle Charging Network Phase I), D.14-03-021 (Mobile Home Park to the Meter), D.20-11-035 (2019 CEMA), AL 4392-G/6100-E (WMBA and VMBA), AL 4444-G/6210-E (RTBA).

In the 2023 GRC application, the Utility proposed a series of safety, resiliency, and clean energy investments to further reduce wildfire risk and deliver safe, reliable, and clean energy service. Among other things, the Utility proposed to invest a total of approximately $31 billion between 2023 and 2026 to reduce wildfire risk; improve gas and electric system safety, reliability, and resiliency; increase the use of new, innovative technologies; and expand its clean energy infrastructure.

In addition to coverage that may be available from the private insurance market, the Utility also proposed to use self-insurance as part of its wildfire insurance program as follows: (1) the Utility’s recommended approach, a new self-insurance structure whereby the Utility would seek customer-funded self-insurance in the amount of $250 million annually and traditional private insurance procurement for amounts between the accumulated self-insurance balance and $1.0 billion; or, alternatively (2) continuing the currently authorized mechanism whereby the Utility seeks procurement of wildfire liability insurance instruments through the private insurance market and is authorized to use any unspent authorized revenue requirements on self-insurance.

In addition, the Utility requested authorization to establish one new balancing account and one new memorandum account as follows:

- Catastrophic Events Straight-Time Labor Balancing Account, a two-way account which would recover straight-time labor costs associated with catastrophic events. These costs are currently recovered through the Catastrophic Events Memorandum Account process.
- Helms Capacity Memorandum Account, which would allow the Utility to track and recover the actual costs associated with upgrading the Helms Pumped Storage Facility through a future application.

The Utility did not seek recovery of compensation of PG&E Corporation’s and the Utility’s officers within the scope of 17 Code of Federal Regulations 240.3b-7.

On October 1, 2021, the CPUC issued a scoping memo indicating that the CPUC will issue a decision on an initial track of the proceeding in the second quarter of 2023. The scoping memo also established a second track of the 2023 GRC to consider costs incurred from 2019 to 2021 that are recorded in balancing or memorandum accounts for, among other work, wildfire mitigation and gas system safety improvements. The second track will review more than $500 million in capital and $160 million in expense included in the Utility’s initial 2023 GRC application for the period from 2019 to 2020, plus additional costs recorded in memorandum and balancing accounts in 2021. The scoping memo indicated that the CPUC will issue a decision on the second track in the third quarter of 2023. The scoping memo also directed the Utility to file an update for its

undergrounding program in February 2022.

On November 5, 2021, the Utility filed a motion to revise the proceeding schedule.

Between August 2021 and January 2022, the Utility served updates to its 2023 GRC testimony that would, if approved, reduce the requested revenue requirement in 2023 by approximately $181 million in the aggregate.

### 2020 General Rate Case

On December 3, 2020, the CPUC approved the final decision for the Utility’s 2020 GRC.

#### Revenue Requirements and Attrition Year Revenues

The final decision approved a 2020 authorized revenue requirement of $9.102 billion, effective January 1, 2020. The CPUC also approved the revenue requirements for 2021 and 2022 as follows: an additional increase of $316 million in 2021 over the authorized 2020 revenue requirement, or a 3.5% increase, and an additional increase of $364 million in 2022, or a 3.9% increase. The Utility is authorized to collect in rates the difference between the revenue requirement in effect and the 2020 GRC decision-authorized revenue requirement for the period of January 1, 2020 to February 28, 2021 over the period of March 1, 2021 through December 31, 2022.

The final decision also allows the Utility to recover the annual cost of excess liability insurance for coverage of up to $1.4 billion. An advice letter is required for recovery of excess liability insurance costs for coverage exceeding $1.4 billion. The final decision also approved wildfire mitigation capital expenditures in the Community Wildfire Safety Program of $603 million in 2020, $931 million in 2021 and $1.15 billion in 2022. In addition, the final decision requires a reasonableness review and recovery of WMBA costs or unit costs for system hardening in excess of 115% of the adopted amounts and VMBA costs in excess of 120% of the adopted amounts through an application.

#### Rate Base and Capital Additions

The CPUC also adopted a rate base of $31.0 billion in 2021, or a 5.4% increase over 2020; and $33.0 billion in 2022, or a 6.3% increase over 2021. Consistent with AB 1054, the decision provides for a total of $2.83 billion in forecast capital spend without an equity return for the period of August 2019 to December 2022, which includes $931 million for 2021 and $1.15 billion for 2022.

Over the 2020-2022 GRC period, the decision provided average annual capital investments of approximately $4.5 billion in electric distribution, natural gas distribution and electric generation infrastructure.

### 2019 Gas Transmission and Storage Rate Case

As previously disclosed, on September 12, 2019, the CPUC approved the final decision in the 2019 GT&S rate case of the Utility. The CPUC adopted revenue requirements of $1.516 billion for 2021 and $1.580 billion for 2022, compared to the Utility’s request of $1.693 billion for 2021 and $1.679 billion for 2022.

On October 23, 2019, the Utility filed an application with the CPUC requesting the rehearing of the final decision. Specifically, issues identified by the Utility include the adopted disallowance associated with vintage pipe replacement, reduction in the Utility’s expense forecast for in-line inspections, and establishment of a memo account for Internal Corrosion Direct Assessment. On November 19, 2021, the CPUC issued a decision denying the Utility’s application for rehearing but allowing the Utility to file an advice letter to remove the 2015 portion of the capital vintage pipe replacement disallowance. The advice letter was approved by the CPUC on January 21, 2022.

Removing the 2015 value of $39.4 million from the disallowance reduced the total disallowed amount from $237.3 million to $197.9 million.

### Cost of Capital Proceedings

On December 19, 2019, the CPUC approved a final decision in the 2020 cost of capital application (the “2020 cost of capital application”), maintaining the Utility’s return on common equity at the 2019 level of 10.25% for the three-year period beginning January 1, 2020. The decision maintained the common equity component of the Utility’s capital structure at 52% and reduced its preferred stock component from 1% to 0.5%. The decision also approved the cost of debt requested by the Utility.

The Utility’s annual cost of capital adjustment mechanism, which allows for changes in the Utility’s authorized ROE and cost of debt, also remained unchanged by the final 2020 cost of capital application decision. The mechanism provides that in any year in which the difference between (i) the average Moody’s utility bond rates (as measured in the 12-month period from October through September (the index)) and (ii) 4.5% (the benchmark) exceeds 100 basis points, the Utility’s ROE will be adjusted by one-half of such difference, and the cost of debt will be trued up to the most recent recorded cost of debt. The Utility is to initiate this adjustment mechanism by filing an advice letter on or before October 15 of the year in which the mechanism triggered, to become effective on January 1 of the next year.

On August 23, 2021, the Utility filed an off-cycle 2022 cost of capital application with the CPUC based on the extraordinary event of the COVID-19 pandemic and related government response, which has decreased interest rates but has not reduced the cost of capital for electric utilities in general, and the Utility in particular, to the same extent as the overall financial markets (the “2022 cost of capital application”). The 2022 cost of capital application requested that the CPUC authorize the Utility's cost of capital for its electric generation, electric distribution, natural gas distribution, and natural gas transmission and storage rate base beginning on January 1, 2022 for 2022, 2023, and 2024. The Utility requested that the CPUC approve the Utility’s proposed ratemaking capital structure (i.e., the relative weightings of common equity, preferred equity, and debt for ratemaking), ROE, cost of preferred stock, and cost of debt. The Utility proposed to establish a cost of long-term debt of 4.14%, a return on preferred stock of 5.52%, a ROE of 11%, and to retain the existing capital structure. The Utility also concurrently filed a motion requesting that the revenue requirement for the 2022 cost of capital be recorded in memorandum accounts to be trued-up following a final decision in this proceeding.

In September 2021, the cost of capital adjustment mechanism was triggered because the index was 117 basis points below the benchmark. As the 2022 cost of capital application was pending, the Utility did not file the October 15, 2021 advice letter to adjust rates. Subsequently, on October 28, 2021, the CPUC ruled that the 2022 cost of capital application did not suspend the adjustment mechanism as requested by the application. The ruling also required that the Utility comply with the cost of capital mechanism by filing the information that would have been included in the October 15, 2021 advice letter in the 2022 cost of capital application proceeding on November 8, 2021, which the Utility did.

On December 17, 2021, the CPUC issued a final decision authorizing the Utility’s request to establish memorandum accounts to track revenue requirement changes starting on January 1, 2022 and leaving the cost of capital rates at current levels, subject to true-up based on the CPUC’s decision on the 2022 cost of capital application.

On December 24, 2021, the CPUC issued a scoping memo in the 2022 cost of capital application limiting the scope of the Utility’s 2022 cost of capital application to the 2022 cost of capital only. The scoping memo also affirmed that the Utility is to file a 2023 cost of capital application in April 2022 for the 2023 test year.

To set the 2022 cost of capital, the CPUC will consider (i) whether there are extraordinary circumstances that warrant a departure from the cost of capital mechanism for 2022; and (ii) if so, whether to leave the cost of capital components at pre-2022 levels for the year 2022, or open a second phase to consider alternative cost of capital proposals for the year 2022. The Utility’s position is that there are extraordinary circumstances that warrant a departure from the cost of capital mechanism for 2022 and that the CPUC should leave the cost of capital components at pre-2022 levels for 2022.

If the CPUC determines that the 2022 cost of capital application establishes extraordinary circumstances that warrant a departure from the cost of capital mechanism for 2022 and leaves the Utility’s cost of capital components at pre-2022 levels for 2022, the cost of long-term debt would be 4.17%, the return on preferred stock would be 5.52%, and the ROE would be 10.25%. If the CPUC opens a second phase of the proceeding, the CPUC would set the cost of capital for 2022 based on alternative cost of capital proposals that would address the technical cost of capital material included within the Utility’s 2022 cost of capital application.

If the CPUC determines that there are not extraordinary circumstances that warrant a departure from the cost of capital mechanism for 2022, the cost of capital adjustment mechanism would operate and the cost of long-term debt would be 4.15%, the return on preferred stock would be 5.52%, and the ROE would be 9.67%. The resulting decrease in the CPUC jurisdictional gas and electric revenue requirement would be approximately $163 million ($99 million electric and $64 million gas).

The scoping memo called for briefing to be completed by March 25, 2022 but did not indicate timing for a PD or final decision.

### 2015 Gas Transmission and Storage Rate Case

On June 23, 2016, the CPUC approved a final phase one decision in the Utility’s 2015 GT&S rate case. The phase one decision excluded from rate base $696 million of 2011 to 2014 capital spending in excess of the amount adopted in the prior GT&S rate case. The decision permanently disallowed $120 million of that amount and ordered that the remaining $576 million be subject to an audit overseen by the CPUC staff, with the possibility that the Utility may seek recovery in a future proceeding. For more information regarding this proceeding, see Note 15 of the Notes to the Consolidated Financial Statements in Item 8.

### Transmission Owner Rate Cases

#### Transmission Owner Rate Cases for 2015 and 2016 (the “TO16” and “TO17” rate cases, respectively)

As previously disclosed, on January 8, 2018, the Ninth Circuit Court of Appeals issued an opinion granting an appeal of the FERC’s decisions in the TO16 and TO17 rate cases that had granted the Utility a 50-basis point ROE incentive adder for its continued participation in the CAISO. If the FERC concluded on remand that the Utility should no longer be authorized to receive the 50 basis point ROE incentive adder, the Utility would incur a refund obligation of $1 million and $8.5 million for TO16 and TO17, respectively. Those rate case decisions were remanded to the FERC for further proceedings consistent with the Ninth Circuit Court of Appeals’ opinion.

On July 18, 2019, the FERC issued its order on remand reaffirming its prior grant of the Utility’s request for the 50-basis point ROE adder.

On March 17, 2020, the FERC issued its order denying requests for rehearing that were previously filed by several parties. On May 11, 2020, the CPUC and a number of other parties filed a petition for review of the FERC’s orders in the Ninth Circuit Court of Appeals. Oral argument was held on April 16, 2021.

#### Transmission Owner Rate Case for 2017 (the “TO18” rate case)

As previously disclosed, on July 29, 2016, the Utility filed its TO18 rate case with the FERC requesting a 2017 retail electric transmission revenue requirement of $1.72 billion, a $387 million increase over the 2016 revenue requirement of $1.33 billion. The forecasted network transmission rate base for 2017 was $6.7 billion. The Utility sought a ROE of 10.9%, which included an incentive component of 50 basis points for the Utility’s continuing participation in the CAISO.

On October 15, 2020, the FERC issued an order that, among other things, rejected the Utility’s direct assignment of common plant to FERC and required the allocation of all common plant between CPUC and FERC jurisdiction be based on operating and maintenance labor ratios. The order reopened the record for the limited purpose of allowing the participants to the proceeding an opportunity to present written evidence concerning the FERC’s revised ROE methodology adopted in FERC Opinion No. 569-A, issued on May 21, 2020. Initial briefs and testimony were filed on December 14, 2020 and responses were filed on February 12, 2021.

On December 17, 2020 and June 17, 2021, the FERC issued orders denying requests for rehearing submitted by the Utility and intervenors. In 2021, the Utility filed four appeals. The appeals related to two issues: (1) impact of the Tax Act on TO18 rates in January and February 2018 and (2) aspects of the rehearing order other than the Tax Act. The appeals have been consolidated and are currently being held in abeyance until the FERC addresses the ROE issue.

As a result of an order denying rehearing on the common plant allocation, the Utility increased its Regulatory liabilities for amounts previously collected during the TO18, TO19, and TO20 rate case periods from 2017 through the fourth quarter of 2021 by approximately $324 million. A portion of these common plant costs are expected to be recovered at the CPUC in a separate application and as a result, as of December 31, 2021, the Utility has recorded approximately $197 million to Regulatory assets.

Aside from the ultimate outcome of the common plant allocation, which is subject to further appellate briefing and a further FERC decision on ROE, that order is not expected to result in a material impact on the Utility’s financial condition, results of operations, liquidity, and cash flows. Some of the issues that will be decided in a final and unappealable TO18 decision, including the common plant allocation, will also be incorporated into the Utility’s TO19 and TO20 rate cases. See “Transmission Owner Rate Case Revenue Subject to Refund” in Note 15 of the Notes to the Consolidated Financial Statements in Item 8.

#### Transmission Owner Rate Case for 2018 (the “TO19” rate case)

As previously disclosed, on July 27, 2017, the Utility filed its TO19 rate case with the FERC. On December 20, 2018, the FERC issued an order approving an all-party settlement filed by the Utility. As part of the settlement, the TO19 revenue requirement will be set at 98.85% of the revenue requirement for TO18 that will be determined upon the issuance of a final, non-appealable TO18 decision. Additionally, if the Ninth Circuit Court of Appeals were to determine that the Utility was not entitled to the 50 basis point incentive adder for the Utility’s continued CAISO participation, then the Utility would be obligated to make a refund to customers of approximately $25 million. See “Transmission Owner Rate Cases for 2015 and 2016” above for a discussion of the incentive adder. On December 20, 2018, the FERC issued an order approving the all-party settlement.

#### Transmission Owner Rate Case for 2019 (the “TO20” rate case)

As previously disclosed, on October 1, 2018, the Utility filed its TO20 rate case with the FERC requesting approval of a formula rate for the costs associated with the Utility’s electric transmission facilities. On November 30, 2018, the FERC issued an order accepting the Utility’s October 2018 filing, subject to hearings and refund, and established May 1, 2019 as the effective date for rate changes. The FERC also ordered that the hearings be held in abeyance pending settlement discussions among the parties.

On March 31, 2020, the Utility filed a partial settlement with the FERC, which the FERC approved on August 17, 2020. On October 15, 2020, the Utility filed a settlement with the FERC resolving all of the remaining issues in the formula rate proceedings, including the Utility’s ROE, capital structure, depreciation rates, as well as certain other aspects of the Utility’s formula rate. Specifically, the settlement establishes an all-in ROE of 10.45%; a fixed capital structure of 49.75% common stock, 49.75% debt, and 0.5% preferred stock; and fixed depreciation rates for various categories of transmission facilities (represented by individual FERC accounts). The term of the settlement continues until December 31, 2023 and the Utility will be required to file a replacement rate filing to be effective on January 1, 2024.

On December 30, 2020, the FERC approved the settlement without modifications.

Some of the issues that will be decided in a final and unappealable TO18 decision, including the common plant allocation, will also be incorporated into the Utility’s TO19 and TO20 rate cases.

### Other Regulatory Proceedings

### Application to Sell General Office Complex

On September 30, 2020, the Utility filed an application with the CPUC to sell the SFGO located at 25 Beale Street, 45 Beale Street, 77 Beale Street, 50 Main Street, 215 Market Street and 245 Market Street in downtown San Francisco, and to recover costs to relocate its staff at the SFGO to a new headquarters at the Lakeside Building, and for appropriate ratemaking treatment of those transactions.

On May 21, 2021, the Utility entered into a purchase agreement with HNG Atlas US LP, to sell the SFGO for $800 million.

On May 26, 2021, the Utility filed an amended settlement agreement with the CPUC. Under the amended settlement, the parties agreed that (1) the Utility’s headquarters strategy, including the move to the Lakeside Building, the sale of the SFGO, and the terms of the agreement to lease and the option to purchase the Lakeside Building, is reasonable, (2) all of the net gain on sale of the SFGO will be distributed to customers over five years, beginning in 2022, and (3) the costs associated with the Utility’s move to the Lakeside Building and development will be considered at later stages of the proceeding through a petition for modification of the final decision in the proceeding.

The CPUC issued a final decision approving the purchase agreement and the ratemaking treatment proposed under the parties’ settlement on August 19, 2021, and the sale closed on September 17, 2021. The final decision defers, until the petition for modification, determinations as to the amount of the Utility’s cost recovery in connection with the anticipated purchase of the Lakeside Building and operating and capital expenses related to the transition to the Lakeside Building.

### Application for Post-Emergence Securitization Transaction

On April 30, 2020, the Utility filed an application with the CPUC seeking authorization for a post-emergence transaction to recover $7.5 billion of 2017 wildfire claims costs through securitization that is designed to be rate neutral to customers, with the proceeds used to pay or reimburse the Utility for the payment of wildfire claims costs associated with 2017 Northern California wildfires. Among other uses, as a result of the proposed transaction, the Utility would retire $6.0 billion of Utility debt. Specifically, the application requested administration of the stress test methodology approved in the CHT OIR and a determination that $7.5 billion in 2017 catastrophic wildfire costs and expenses are stress test costs and eligible for securitization. In this context, a securitization refers to a financing transaction where a special purpose financing vehicle issues new debt that is secured by the proceeds of a new recovery charge to Utility customers. The application also proposed a customer credit designed to equal the bond charges over the life of the bonds, which would insulate customers from the charge on customer bills associated with the bonds.

On April 23, 2021, the CPUC issued a decision finding that $7.5 billion of the Utility’s 2017 catastrophic wildfire costs and expenses are stress test costs that may be financed through the issuance of recovery bonds pursuant to Public Utilities Code sections 850 *et seq.* and approving a structure for the transaction. As requested, the decision authorizes the Utility to establish a customer credit trust funded by PG&E Corporation’s shareholders, that will provide a monthly credit to customers that is anticipated to equal the securitized charges such that the securitization is designed to be rate neutral to customers. Subject to retention of the CPUC’s existing jurisdiction, the decision adopts a transaction structure comprised of four elements (1) an initial shareholder contribution of $2.0 billion, with $1.0 billion to be contributed in 2022 and $1.0 billion to be contributed in 2024; (2) up to $7.59 billion of additional contributions funded by certain shareholder tax benefits; (3) a single CPUC review of the balance of the customer credit trust in 2040, with a single contingent supplemental shareholder contribution, if needed, up to $775 million in 2040; and (4) sharing with customers 25% of any surplus of shareholder assets in the customer credit trust at the end of the life of the trust. Three parties filed applications for rehearing of the decision on May 3, 2021, and the Utility filed a response to those applications on May 14, 2021. On August 12, 2021, the CPUC issued a decision denying the applications for rehearing.

Separately, on January 6, 2021, the Utility filed an additional application requesting that the CPUC issue a financing order authorizing the issuance of one or more series of recovery bonds in connection with the post-emergence transaction to finance, using securitization, the $7.5 billion of claims associated with the 2017 Northern California wildfires. On May 11, 2021, the CPUC issued a decision granting the Utility’s January 2021 application for a financing order authorizing the issuance of $7.5 billion of recovery bonds in connection with the rate neutral securitization proceeding. Two parties filed applications for rehearing of the financing order, and the Utility filed a response to those applications for rehearing on June 4, 2021. On August 12, 2021, the CPUC issued a decision denying the applications for rehearing.

On September 10, 2021, TURN filed a petition for writ of review of the decision and financing order in state court. Responses to the petition were filed on October 15, 2021. TURN filed a reply in support of the petition on November 9, 2021.

### Application for AB 1054 Securitization Transaction

AB 1054 provides that the first $5.0 billion expended in the aggregate by California’s three large electric IOUs on fire risk mitigation capital expenditures included in their respective approved WMPs will be excluded from their respective equity rate bases. The $5.0 billion of capital expenditures has been allocated among the large electric IOUs in accordance with their Wildfire Fund allocation metrics. The Utility’s allocation is $3.21 billion. (See Note 3 of the Notes to the Consolidated Financial Statements in Item 8.) AB 1054 contemplates that such capital expenditures may be financed using a structure that securitizes a dedicated customer charge.

On February 24, 2021 the Utility filed an application with the CPUC seeking authorization for a transaction to finance, using securitization, up to $1.19 billion of fire risk mitigation capital expenditures that were or will be incurred by the Utility in 2020 and 2021, with the final amount to be financed based on recorded 2020 and 2021 Community Wildfire Safety Program capital expenditures incurred by the Utility prior to the securitization transaction.

The application requested that the CPUC issue a financing order authorizing one or more series of recovery bonds, determine that the issuance of the bonds and collection through fixed recovery charges is just and reasonable, consistent with the public interest and would reduce rates on a present value basis compared to traditional utility financing mechanisms, and authorize the Utility to collect a non-bypassable charge sufficient to pay debt service on the recovery bonds. The application also requested to exclude the securitized debt from the Utility’s ratemaking capital structure and to adjust its 2020 GRC revenue requirement following the issuance of the recovery bonds.

On June 24, 2021, the CPUC issued a decision granting the Utility’s application and authorizing the Utility to issue up to approximately $1.2 billion of recovery bonds. On July 6, 2021, the financing order became final and non-appealable. On November 12, 2021, PG&E Recovery Funding LLC issued approximately $860 million of senior secured recovery bonds. The recovery bonds were issued in three tranches: (1) approximately $266 million with an interest rate of 1.46% and is due July 15, 2033, (2) approximately $160 million with an interest rate of 2.28% and is due January 15, 2038, and (3) approximately $434 million with an interest rate of 2.82% and is due July 15, 2048.

### 2020-2022 Wildfire Mitigation Plan

As previously disclosed, on February 7, 2020, the Utility submitted its 2020 WMP and the related utility survey. The Utility’s 2020 WMP describes the Utility’s wildfire safety programs, which are focused on three key areas: reducing the potential for fires to be started by electrical equipment, reducing the potential for fires to spread, and minimizing the frequency, scope and duration of PSPS events, as well as providing historical data. The Utility’s 2020 WMP covers a three-year period from 2020 to 2022 but is updated annually.

The Utility’s 2021 WMP was submitted on February 5, 2021. The 2021 WMP updated the 2020 WMP and addressed the Utility’s wildfire safety programs focused on reducing the potential for catastrophic wildfires related to electrical equipment, reducing the potential for fires to spread and reducing the impact of PSPS events.

On September 22, 2021, OEIS issued a final action statement approving the Utility’s 2021 WMP and on October 21, 2021, the CPUC ratified OEIS’s approval.

In 2021, the Utility notified the CPUC that it had missed inspections and other targets subject to the 2020 WMP. The Utility is undertaking a review of its electric asset inspections. For more information, see “Electric Asset Inspections” below.

On December 16, 2021, the CPUC closed the WMP proceeding, noting that OEIS is now responsible for review and approval of the WMP.

### OII to Examine the Late 2019 Public Safety Power Shutoff Events

On November 13, 2019, the CPUC issued an OII to determine “whether California’s IOUs prioritized safety and complied with the CPUC’s regulations and requirements with respect to their PSPS events in late 2019.”

On June 7, 2021, the CPUC issued a final decision in the case that found each of the large electric IOUs to be noncompliant with CPUC-required guidelines in certain of their 2019 PSPS events. The decision included a financial remedy and a number of corrective actions. The financial remedy consists of forgoing collection of revenues from customers associated with electricity not sold during future PSPS events until it can be demonstrated that the utilities have made improvements in assessing public harm when determining whether to initiate a PSPS event. The corrective actions involve the Utility’s processes, reporting, and other aspects of its PSPS program. On July 7, 2021, the Acton Town Council filed an application to rehear the decision. Responses to the application for rehearing were filed on July 22, 2021.

### Integrated Resource Planning Procurement

On November 13, 2019, the CPUC issued a decision that takes a number of steps to address the potential for system RA shortages beginning in 2021. The decision requires incremental procurement of system-level qualifying RA capacity of 3,300 MWs by all LSEs operating within the CAISO’s balancing area for the period 2021-2023, of which the Utility is responsible for 716.9 MWs for its bundled customer portion. The decision requires that at least 50% of LSE resource responsibilities come online by August 1, 2021, at least 75% by August 1, 2022, and the remaining by August 1, 2023. Additionally, the decision directs the IOUs to act as the backstop procurement agent for CCAs and energy service providers that choose not to voluntarily self-procure or that fail to meet their procurement responsibilities after electing to self-provide their assigned MWs of system RA capacity under the decision.

The Utility procured its required RA capacity for the August 1, 2021 milestone from third parties through CPUC-approved contracts for lithium-ion battery energy storage resources with terms ranging from 10-15 years. On December 22, 2020, the Utility filed an advice letter seeking CPUC approval of an additional group of similar contracts that would satisfy the balance of the Utility’s procurement obligations for the August 1, 2022 and August 1, 2023 milestones. On April 15, 2021, the CPUC approved the contracts.

On June 24, 2021, the CPUC adopted a mid-term reliability decision to address incremental electric system reliability needs between 2024 and 2026 due to, in part, the pending retirements of Diablo Canyon and once-through-cooling natural gas plants in Southern California by requiring at least 11,500 MW of additional net qualifying capacity to be procured by LSEs subject to the CPUC’s integrated resource planning authority. The decision sets procurement requirements of 2,000 MW by 2023, an additional 6,000 MW by 2024, an additional 1,500 MW by 2025, and an additional 2,000 MW by 2026. The decision sets the Utility’s share of the procurement at 2,302 MW of incremental net qualifying capacity.

On January 21, 2022, the Utility filed an advice letter with the CPUC seeking approval of a group of nine long-term RA agreements to meet a portion of its procurement requirements under the CPUC’s mid-term reliability decision. The agreements are each for a term of 15 years and collectively supply 1,598.7 MW of lithium-ion energy storage capacity with some projects expected to be operational in 2023 and others in 2024.

### OIR to Further Develop a Risk-Based Decision-Making Framework for Electric and Gas Utilities

On July 20, 2020, the CPUC initiated a rulemaking proceeding to consider ways to strengthen the risk-based decision-making framework that energy utilities use to assess, manage, mitigate and minimize safety risks.

On November 4, 2021, the CPUC issued a final decision adopting 32 safety and operational metrics, which can serve as triggering events in the EOEP and requiring the Utility to report on performance against these metrics on a semi-annual basis. The Utility is required to submit the first report by March 31, 2022. The Utility will propose one- and five-year targets for each metric in such report.

### OIR to Revisit Net Energy Metering Tariffs

On August 17, 2020, the CPUC initiated a rulemaking proceeding to develop a successor to the existing NEM tariffs. The successor tariff is being developed pursuant to the requirements of AB 327. Under AB 327, the successor to the existing NEM tariffs should provide customer-generators with credit or compensation for electricity generated by their renewable facilities based on the value of that generation to all customers and allow customer-sited renewable generation to grow sustainably among different types of customers.

On December 13, 2021, the CPUC issued a PD that would reduce the compensation for new non-CARE NEM customers by about 80 percent for standalone solar and about 60 percent for solar-paired storage. Commercial customer NEM compensation would be reduced by about 35 percent. Additionally, the PD would reduce the legacy period for existing non-CARE NEM customers from 20 years to 15 years after which such customers would transition to the successor tariff. Comments and reply comments on the PD were filed in January 2022. The PD has not yet been scheduled to be voted on by the CPUC.

### OIR to Address Energy Utility Customer Debt Accumulated during the COVID-19 Pandemic

On February 11, 2021, the CPUC initiated a rulemaking proceeding to consider arrearage relief for utility customers with outstanding utility bills when the moratorium on service disconnections ended. The OIR will evaluate a more global program beyond the currently approved arrearage management program focused on low-income residential customers that is funded by the Utility’s customers. The OIR may consider various funding approaches for this expanded debt forgiveness proposal, which could include shareholder funding.

On June 30, 2021, the CPUC issued a final decision directing the Utility and other IOUs to automatically enroll residential customers and small business customers more than 60 days in arrears in payment plans. The decision also extended the moratorium on service disconnections for residential and small business, as well as medium and large commercial and industrial customers, through September 30, 2021.

On November 19, 2021, the CPUC issued a decision authorizing IOUs to allocate payments made on past-due electric utility bills proportionally between utilities and CCAs through September 2024.

### Self-Reports to the CPUC

The Utility self-reports certain errors and omissions to the CPUC. The Utility could face penalties, enforcement actions, or other adverse legal or regulatory consequences for these errors or omissions, including under the EOEP. The Utility is unable to predict the likelihood and the amount of potential fines or penalties, if any, related to these matters.

#### Electric Asset Inspections

The Utility has notified the CPUC of various errors relating to inspections and maintenance of its electric assets or implementation of WMP initiatives. These notices include missed inspections or the inability to locate records evidencing performance of inspections required under CPUC GOs 95 and 165 (including failure to perform inspections in compliance with GO 165 of approximately 55,000 poles in 2020) and errors regarding reporting meeting targets set by the Utility’s 2020 WMP. In these notices, the Utility describes the failures and corrective actions the Utility is taking to remediate these issues and to prevent recurrence in the future. Among other corrective measures, the Utility has developed short-term and longer-term systemic corrective actions to address these errors, including performing enhanced inspections for poles with outdated or incomplete GO 165 inspection records and strengthening the Utility’s asset registry, as well as corrective actions regarding reporting on the progress toward WMP targets.

The Utility continues to evaluate whether there are additional failures to comply with GOs 95 and 165 and the 2020 WMP, beyond those identified in submitted self-reports. The Utility intends to update the CPUC upon completion of its reviews.

On November 21, 2021, the SED issued two citations to the Utility in relation to the Utility’s self-reports. One citation was for incomplete inspections performed on distribution poles as required under GO 165, and the other citation was for the Utility’s failure to adequately inspect a transmission line. The citations resulted in penalties of $2.5 million and $5 million, respectively, which the Utility paid in full on December 22, 2021.

#### Subsurface Electric Ducts

On October 21, 2021, the Utility notified the CPUC of inconsistent application of the requirements to locate and mark empty subsurface electric ducts in accordance with Government Code section 4216(k), 4216(s) and 4216.3(a)(1)(A).

### LEGISLATIVE AND REGULATORY INITIATIVES

### Assembly Bill 242

Assembly Bill 242, which was signed into law on September 23, 2021, expanded the definition of a “covered wildfire” from AB 1054 to also include those wildfires determined by a court of competent jurisdiction to be caused by an electrical corporation, and those wildfires asserted to have been caused by an electrical corporation that result in a court-approved dismissal resulting from the settlement of third-party damage claims.

### Assembly Bill 135

On July 16, 2021, the California governor approved AB 135, which established the CAPP. CAPP enables the IOUs to apply for a statewide total of approximately $695 million to offset customer arrearages incurred during the COVID-19 pandemic. The Utility received approximately $300 million in January 2022 to reduce the amounts owed by customer accounts in arrears. The amount of funding was determined by the California Department of Community Services and Development, which is the agency responsible for administering the CAPP.

### Vaccine Mandates

On September 9, 2021, President Biden issued an EO that would require certain COVID-19 precautions for government contractors and their subcontractors, including mandatory employee vaccination. The requirements under the EO is currently stayed pending the outcome of ongoing litigation. The ultimate implementation of the EO could result in workplace disruptions, employee attrition, and difficulty securing future labor needs.

### ENVIRONMENTAL MATTERS

The Utility’s operations are subject to extensive federal, state, and local laws and permits relating to the protection of the environment and the safety and health of the Utility’s personnel and the public. These laws and requirements relate to a broad range of the Utility’s activities, including the remediation of hazardous wastes; the reporting and reduction of carbon dioxide and other GHG emissions; the discharge of pollutants into the air, water, and soil; the reporting of safety and reliability measures for natural gas storage facilities; and the transportation, handling, storage, and disposal of spent nuclear fuel. See Item 1A. Risk Factors, “Environmental Regulation” in Item 1. and “Environmental Remediation Contingencies” in Note 15 of the Notes to the Consolidated Financial Statements in Item 8.

### RISK MANAGEMENT ACTIVITIES

PG&E Corporation, mainly through its ownership of the Utility, and the Utility are exposed to risks associated with adverse changes in commodity prices, interest rates, and counterparty credit. The Utility actively manages market risk through risk management programs designed to support business objectives, discourage unauthorized risk-taking, reduce commodity cost volatility, and manage cash flows. The Utility uses derivative instruments only for non-trading purposes (i.e., risk mitigation) and not for speculative purposes.

### Commodity Price Risk

The Utility is exposed to commodity price risk as a result of its electricity and natural gas procurement activities, including the procurement of natural gas and nuclear fuel necessary for electricity generation and natural gas procurement for core customers. The Utility’s risk management activities include the use of physical and financial instruments such as forward contracts, futures, swaps, options, and other instruments and agreements. As long as the Utility can conclude that it is probable that its reasonably incurred wholesale electricity procurement costs and natural gas costs are recoverable, fluctuations in electricity and natural gas prices do not affect earnings. Such fluctuations, however, may impact cash flows. The Utility’s natural gas transportation and storage costs for core customers are also fully recoverable through a ratemaking mechanism.

The Utility’s current authorized revenue requirement for natural gas transportation and storage service to non-core customers is not balancing account protected. The Utility recovers these costs in its GRC through fixed reservation charges and volumetric charges from long-term contracts, resulting in price and volumetric risk. The Utility uses value-at-risk to measure its shareholders’ exposure to these risks. The Utility’s value-at-risk was approximately $5 million and $14 million at December 31, 2021 and 2020, respectively. See Note 10 of the Notes to the Consolidated Financial Statements in Item 8. for further discussion of price risk management activities.

### Interest Rate Risk

Interest rate risk sensitivity analysis is used to measure interest rate risk by computing estimated changes in cash flows as a result of assumed changes in market interest rates. At December 31, 2021 and 2020, if interest rates changed by one percent for all PG&E Corporation and Utility variable rate long-term debt, short-term debt, and cash investments, the pre-tax impact on net income over the next 12 months would be $76 million and $89 million, respectively, based on net variable rate debt and other interest rate-sensitive instruments outstanding. See Note 5 of the Notes to the Consolidated Financial Statements in Item 8. for further discussion of interest rates.

### Energy Procurement Credit Risk

The Utility conducts business with counterparties mainly in the energy industry to purchase electricity or gas and related services, including the CAISO market, other California IOUs, municipal utilities, energy trading companies, pipelines, financial institutions, electricity generation companies, and oil and natural gas production companies located in the United States and Canada. If a counterparty fails to perform on its contractual obligation to deliver electricity or gas and related services, then the Utility may find it necessary to procure electricity or gas at current market prices or seek alternate services, which may be higher than the contract prices.

The Utility manages credit risk associated with its counterparties by assigning credit limits based on evaluations of their financial conditions, net worth, credit ratings, and other credit criteria as deemed appropriate. Credit limits and credit quality are monitored periodically. The Utility executes many energy contracts under master commodity enabling agreements that may require security. Security may be in the form of cash or letters of credit. The Utility may accept other forms of performance assurance in the form of corporate guarantees of acceptable credit quality or other eligible securities (as deemed appropriate by the Utility). Security or performance assurance may be required from the Utility or counterparties when current net receivables/payables and exposure exceed contractually specified limits.

The following table summarizes the Utility’s energy procurement credit risk exposure to its counterparties:

|  | Exposure (1) (in millions) | Number of Wholesale Customers or Counterparties \>10% | Net Credit Exposure to Wholesale Customers or Counterparties \>10% (in millions) |
| --- | ---: | ---: | ---: |
| December 31, 2021 | $570 | 1 | $63 |
| December 31, 2020 | $250 | 2 | $57 |

(1) Exposure is the positive exposure maximum that equals mark-to-market value on physically and financially settled contracts, plus net receivables (payables) where netting is contractually allowed minus collateral posted by counterparties and held by the Utility plus collateral posted by the Utility and held by the counterparties. For purposes of this table, parental guarantees are not included as part of the calculation. Exposure amounts reported above do not include adjustments for time value or liquidity.

### CRITICAL ACCOUNTING ESTIMATES

The preparation of the Consolidated Financial Statements in accordance with GAAP involves the use of estimates and assumptions that affect the recorded amounts of assets and liabilities as of the date of the financial statements and the reported amounts of revenues and expenses during the reporting period. The accounting policies described below are considered to be critical accounting estimates due, in part, to their complexity and because their application is relevant and material to the financial position and results of operations of PG&E Corporation and the Utility, and because these policies require the use of material judgments and estimates. Actual results may differ materially from these estimates and assumptions. These accounting estimates and their key characteristics are outlined below.

### Contributions to the Wildfire Fund

The Wildfire Fund is expected to be capitalized with (i) $10.5 billion of proceeds of bonds supported by a 15-year extension of the Department of Water Resources charge to customers, (ii) $7.5 billion in initial contributions from California’s three large electric IOUs, and (iii) $300 million in annual contributions paid by California’s three large electric IOUs for a 10-year period. The contributions from the IOUs will be effectively borne by their respective shareholders, as they will not be permitted to recover these costs through rates. The costs of the initial and annual contributions are allocated among the IOUs pursuant to a “Wildfire Fund allocation metric” set forth in AB 1054 based on land area in the applicable IOU’s service territory classified as HFTDs and adjusted to account for risk mitigation efforts. The Utility’s Wildfire Fund allocation metric is 64.2% (representing an initial contribution of approximately $4.8 billion and annual contributions of approximately $193 million).

On the Emergence Date, PG&E Corporation and the Utility contributed, in accordance with AB 1054, an initial contribution of approximately $4.8 billion and first annual contribution of approximately $193 million to the Wildfire Fund to secure participation of the Utility therein. The other large electric IOUs made their initial contributions to the Wildfire Fund in September 2019. On December 30, 2020 and 2021, the Utility made its second and third annual contributions of $193 million each to the Wildfire Fund. As of December 31, 2021, PG&E Corporation and the Utility have seven remaining annual contributions of $193 million (based on the current Wildfire Fund allocation metric). PG&E Corporation and the Utility account for the contributions to the Wildfire Fund similarly to prepaid insurance with expense being allocated to periods ratably based on an estimated period of coverage.

As of December 31, 2021, PG&E Corporation and the Utility recorded $193 million in Other current liabilities, $1.1 billion in Other non-current liabilities, $461 million in current assets - Wildfire fund asset, and $5.3 billion in non-current assets - Wildfire fund asset in the Consolidated Balance Sheets. During the years ended December 31, 2021 and 2020, the Utility recorded amortization and accretion expense of $517 million and $413 million, respectively. The amortization of the asset, accretion of the liability, and acceleration of the amortization of the asset is reflected in Wildfire Fund expense in the Consolidated Statements of Income. Expected contributions recorded in Wildfire Fund asset on the Consolidated Balance Sheets are discounted to the present value using the 10-year U.S. treasury rate at the date PG&E Corporation and the Utility satisfied all the eligibility requirements to participate in the Wildfire Fund. A useful life of 15 years is being used to amortize the Wildfire Fund asset.

AB 1054 did not specify a period of coverage; therefore, this accounting treatment is subject to significant accounting judgments and estimates. In estimating the period of coverage, PG&E Corporation and the Utility use a Monte Carlo simulation that began with 12 years of historical, publicly available fire-loss data from wildfires caused by electrical equipment, and subsequently plan to add an additional year of data each following year. The period of historic fire-loss data and the effectiveness of mitigation efforts by the California electric utility companies are significant assumptions used to estimate the useful life. These assumptions along with the other assumptions below create a high degree of uncertainty related to the estimated useful life of the Wildfire Fund. The simulation creates annual distributions of potential losses due to fires that could be attributed to the participating electric utilities. Starting with a five-year period of historical data, with average annual statewide claims or settlements of approximately $6.5 billion, compared to approximately $2.9 billion for the 12-year historical data, would have decreased the amortization period to six years. As of December 31, 2021, a 10% change to the assumption around current and future mitigation effort effectiveness would increase the amortization period by three years assuming greater effectiveness and would decrease the amortization period by two years assuming less effectiveness.

Other assumptions used to estimate the useful life include the estimated cost of wildfires caused by other electric utilities, the amount at which wildfire claims would be settled, the likely adjudication of the CPUC in cases of electric utility-caused wildfires and determination of any amounts required to be reimbursed to the Wildfire Fund, the impacts of climate change, the level of future insurance coverage held by the electric utilities, the FERC-allocable portion of loss recovery, and the future transmission and distribution equity rate base growth of other electric utilities. Significant changes in any of these estimates could materially impact the amortization period.

PG&E Corporation and the Utility evaluate all assumptions quarterly and upon claims being made from the Wildfire Fund for catastrophic wildfires, and the expected life of the Wildfire Fund will be adjusted as required. The Wildfire Fund is available to other participating utilities in California and the amount of claims that a participating utility incurs is not limited to their individual contribution amounts. PG&E Corporation and the Utility assess the Wildfire Fund asset for acceleration of the amortization of the asset in the event that a participating utility’s electrical equipment is found to be the substantial cause of a catastrophic wildfire. Timing of any such acceleration of the amortization of the asset could lag as the emergence of sufficient cause and claims information can take many quarters and could be limited to public disclosure of the participating electric utility, if ignition were to occur outside the Utility’s service territory. There were fires in the Utility’s and other participating utilities’ services territories since July 12, 2019, including fires for which the cause is currently unknown, which may in the future be determined to be covered by the Wildfire Fund. As of December 31, 2021, PG&E Corporation and the Utility recorded $150 million in Other noncurrent assets for Wildfire Fund receivables related to the 2021 Dixie fire and $43 million of accelerated amortization, reflected in Wildfire Fund expense.

For more information, see “Initial and Annual Contributions to the Wildfire Fund Established Pursuant to AB 1054” in Note 3 and “Wildfire Fund under AB 1054” in Note 14 of the Notes to the Consolidated Financial Statements in Item 8.

### Loss Contingencies

As discussed below, PG&E Corporation and the Utility have recorded material accruals for various wildfire-related, enforcement and legal matters, and environmental remediation liabilities. PG&E Corporation and the Utility have also recorded insurance receivables for third-party claims.

### Wildfire-Related Liabilities

PG&E Corporation and the Utility are subject to potential liabilities related to wildfires. PG&E Corporation and the Utility record a wildfire-related liability when they determine that a loss is probable and they can reasonably estimate the loss or a range of losses. The provision is based on the lower end of the range, unless an amount within the range is a better estimate than any other amount.

Potential liabilities related to wildfires depend on various factors, including negotiations and settlements or the cause of each fire, contributing causes of the fires (including alternative potential origins, weather and climate related issues), the number, size and type of structures damaged or destroyed, the contents of such structures and other personal property damage, the number and types of trees damaged or destroyed, attorneys’ fees for claimants, the nature and extent of any personal injuries, including the loss of lives, the extent to which future claims arise, the amount of fire suppression and clean-up costs, other damages the Utility may be responsible for if found negligent, and the amount of any penalties or fines that may be imposed by governmental entities. There are a number of unknown facts and legal considerations that may impact the amount of any potential liability, including the total scope and nature of claims that may be asserted against PG&E Corporation or the Utility. For example, the Utility’s wildfire-related accruals have changed in the past as new facts and information became available to the Utility, including the availability of new evidence and additional information about the scope and nature of damages.

The process for estimating wildfire-related liabilities requires management to exercise significant judgment based on a number of assumptions and subjective factors, including the factors identified above and estimates based on currently available information and prior experience with wildfires. See Note 14 of the Notes to the Consolidated Financial Statements in Item 8.

### Enforcement and Litigation Matters

PG&E Corporation and the Utility are subject to various laws and regulations and, in the normal course of business, are named as parties in a number of claims and lawsuits. In addition, penalties may be incurred for failure to comply with federal, state, or local laws and regulations. PG&E Corporation and the Utility record a provision for a loss contingency when it is both probable that a loss has been incurred and the amount of the loss can be reasonably estimated. PG&E Corporation and the Utility evaluate the range of reasonably estimated losses and record a provision based on the lower end of the range, unless an amount within the range is a better estimate than any other amount. The assessment of whether a loss is probable or reasonably possible, and whether the loss or a range of loss is estimable, often involves a series of complex judgments about future events. Loss contingencies are reviewed quarterly and estimates are adjusted to reflect the impact of all known information, such as negotiations, discovery, settlements and payments, rulings, advice of legal counsel, and other information and events pertaining to a particular matter. PG&E Corporation’s and the Utility’s provision for loss and expense excludes anticipated legal costs, which are expensed as incurred. Actual results may differ materially from these estimates and assumptions. See Note 14 and “Enforcement and Litigation Matters” in Note 15 of the Notes to the Consolidated Financial Statements in Item 8.

### Loss Recoveries

PG&E Corporation and the Utility have recovery mechanisms available for wildfire liabilities including from insurance, through rates, and from the Wildfire Fund. The Utility has liability insurance from various insurers, which provides coverage for third-party claims. PG&E Corporation and the Utility record a receivable for a recovery when it is deemed probable that recovery of a recorded loss will occur and they can reasonably estimate the amount or its range. The assessment of whether recovery is probable or reasonably possible, and whether the recovery or a range of recoveries is estimable, often involves a series of complex judgments about future events. Loss recoveries are reviewed quarterly and estimates are adjusted to reflect the impact of all known information, including contractual liability insurance policy coverage, advice of legal counsel, past experience with similar events, conversations with the Wildfire Fund administrators, the CPUC and FERC, and other information and events pertaining to a particular matter. See “Loss Recoveries” in Note 14 of the Notes to the Consolidated Financial Statements in Item 8.

### Environmental Remediation Liabilities

The Utility is subject to loss contingencies pursuant to federal and California environmental laws and regulations that in the future may require the Utility to pay for environmental remediation at sites where it has been, or may be, a potentially responsible party. Such contingencies may exist for the remediation of hazardous substances at various potential sites, including former MGP sites, power plant sites, gas compressor stations, and sites used by the Utility for the storage, recycling, or disposal of potentially hazardous materials, even if the Utility did not deposit those substances on the site.

The Utility generally commences the environmental remediation assessment process upon notification from federal or state agencies, or other parties, of a potential site requiring remedial action. (In some instances, the Utility may initiate action to determine its remediation liability for sites that it no longer owns in cooperation with regulatory agencies. For example, the Utility has a program related to certain former MGP sites.) Based on such notification, the Utility completes an assessment of the potential site and evaluates whether it is probable that a remediation liability has been incurred. The Utility records an environmental remediation liability when site assessments indicate remediation is probable and it can reasonably estimate the loss or a range of possible losses. Given the complexities of the legal and regulatory environment and the inherent uncertainties involved in the early stages of a remediation project, the process for estimating remediation liabilities is subjective and requires significant judgment. Key factors evaluated in developing cost estimates include the extent and types of hazardous substances at a potential site, the range of technologies that can be used for remediation, the determination of the Utility’s liability in proportion to other responsible parties, and the extent to which such costs are recoverable from third parties.

When possible, the Utility estimates costs using site-specific information, but also considers historical experience for costs incurred at similar sites depending on the level of information available. Estimated costs are composed of the direct costs of the remediation effort and the costs of compensation for employees who are expected to devote a significant amount of time directly to the remediation effort. These estimated costs include remedial site investigations, remediation actions, operations and maintenance activities, post remediation monitoring, and the costs of technologies that are expected to be approved to remediate the site. Remediation efforts for a particular site generally extend over a period of several years. During this period, the laws governing the remediation process may change, as well as site conditions, thereby possibly affecting the cost of the remediation effort.

As of December 31, 2021 and 2020, the Utility’s accruals for undiscounted gross environmental liabilities were $1.3 billion each. The Utility’s undiscounted future costs could increase to as much as $2.2 billion if the extent of contamination or necessary remediation is greater than anticipated or if the other potentially responsible parties are not financially able to contribute to these costs, and could increase further if the Utility chooses to remediate beyond regulatory requirements. Although the Utility has provided for known environmental obligations that are probable and reasonably estimable, estimated costs may vary significantly from actual costs, and the amount of additional future costs may be material to results of operations in the period in which they are recognized.

### Regulatory Accounting

As a regulated entity, the Utility records regulatory assets and liabilities for amounts that are deemed probable of recovery from, or refund to, customers. Despite the ongoing losses related to wildfires (see Note 14 of the Notes to the Consolidated Financial Statements in Item 8.), there is no actual or anticipated change in the cost of service regulation of the Utility’s operations. Therefore, the Utility continues to apply the accounting ASC 980, *Regulated Operations*. These amounts would otherwise be recorded to expense or income under GAAP. Refer to “Regulation and Regulated Operations” in Note 3 as well as Note 4 of the Notes to the Consolidated Financial Statements in Item 8. As of December 31, 2021, PG&E Corporation and the Utility reported regulatory assets (including current regulatory balancing accounts receivable) of $12.7 billion and regulatory liabilities (including current regulatory balancing accounts payable) of $13.8 billion.

Determining probability requires significant judgment by management and includes, but is not limited to, consideration of testimony presented in regulatory hearings, proposed regulatory decisions, final regulatory orders, and the strength or status of applications for rehearing or state court appeals. For some of the Utility’s regulatory assets, including utility retained generation, the Utility has determined that the costs are recoverable based on specific approval from the CPUC. The Utility also records a regulatory asset when a mechanism is in place to recover current expenditures and historical experience indicates that recovery of incurred costs is probable, such as the regulatory assets for pension benefits; deferred income tax; price risk management; and unamortized loss, net of gain, on reacquired debt. If the Utility determined that it is no longer probable that regulatory assets would be recovered or reflected in future rates, or if the Utility ceased to be subject to rate regulation, the regulatory assets would be charged against income in the period in which that determination was made. If regulatory accounting did not apply, the Utility’s future financial results could become more volatile as compared to historical financial results due to the differences in the timing of expense or revenue recognition.

A portion of the Utility's regulatory asset balances relate to items which could not be anticipated by the Utility during CPUC GRC rate requests resulting from catastrophic events, changes in regulation, or extraordinary changes in operating practices. The Utility may seek authority to track incremental costs in a memorandum account and the CPUC may authorize recovery of costs tracked in memorandum accounts if the costs are deemed incremental and prudently incurred. These accounts, which include the CEMA, WEMA, FHPMA, FRMMA, WMPMA, VMBA, WMBA, and RTBA among others, allow the Utility to track the costs associated with work related to disaster and wildfire response, and other wildfire prevention-related costs. In addition, the CPPMA and RUBA accounts track costs incurred to implement the CPUC’s Emergency Authorization and Order Directing Utilities to Implement Emergency Customer Protections to Support California Customers During the COVID-19 Pandemic. While the Utility generally believes such costs are recoverable, rate recovery requires CPUC authorization in separate proceedings or through a GRC. For more information, see “Regulatory Matters - Application for Recovery of Costs Recorded in the Wildfire Expense Memorandum Account” and “Regulatory Matters - Catastrophic Event Memorandum Accounts and Applications” above.

Additionally, SB 901 provides a mechanism for the CPUC to potentially allow recovery in future rates, through a securitization mechanism, of wildfire-related costs found to be just and reasonable by the CPUC and, only for the 2017 Northern California wildfires, any amounts in excess of the CHT. The Utility must evaluate the likelihood of recovery in future rates each period. If the criteria are met at a later date, the Utility would recognize a regulatory asset and a related gain in the consolidated income statement in the period in which it is determined that the likelihood of recovery is probable.

In addition, regulatory accounting standards require recognition of a loss if it becomes probable that capital expenditures will be disallowed for ratemaking purposes and if a reasonable estimate of the amount of the disallowance can be made. Such assessments require significant judgment by management regarding probability of recovery, as described above, and the ultimate cost of construction of capital assets. The Utility records a loss to the extent capital costs are expected to exceed the amount to be recovered. The Utility’s capital forecasts involve a series of complex judgments regarding detailed project plans, estimates included in third-party contracts, historical cost experience for similar projects, permitting requirements, environmental compliance standards, and a variety of other factors.

### Asset Retirement Obligations

PG&E Corporation and the Utility account for an ARO at fair value in the period during which the legal obligation is incurred if a reasonable estimate of fair value and its settlement date can be made. At the time of recording an ARO, the associated asset retirement costs are capitalized as part of the carrying amount of the related long-lived asset. The Utility recognizes a regulatory asset or liability for the timing differences between the recognition of expenses and costs recovered through the ratemaking process. See Notes 3 and 4 of the Notes to the Consolidated Financial Statements in Item 8.

To estimate its liability, the Utility uses a discounted cash flow model based upon significant estimates and assumptions about future decommissioning costs, inflation rates, and the estimated date of decommissioning. The estimated future cash flows are discounted using a credit-adjusted risk-free rate that reflects the risk associated with the decommissioning obligation.

At December 31, 2021, the Utility’s recorded ARO for the estimated cost of retiring these long-lived assets was approximately $5.3 billion. Changes in these estimates and assumptions could materially affect the amount of the recorded ARO for these assets.

### Pension and Other Postretirement Benefit Plans

PG&E Corporation and the Utility sponsor a non-contributory defined benefit pension plan for eligible employees as well as contributory postretirement health care and medical plans for eligible retirees and their eligible dependents, and non-contributory postretirement life insurance plans for eligible employees and retirees. Adjustments to the pension and other benefit obligation are based on the differences between actuarial assumptions and actual plan results. These amounts are deferred in accumulated other comprehensive income (loss) and amortized into income on a gradual basis. The differences between pension benefit expense recognized in accordance with GAAP and amounts recognized for ratemaking purposes are recorded as regulatory assets or liabilities as amounts are probable of recovery through rates. To the extent the other benefits are in an overfunded position, the Utility records a regulatory liability. See Note 4 of the Notes to the Consolidated Financial Statements in Item 8.

The pension and other postretirement benefit obligations are calculated using actuarial models as of the December 31 measurement date. The significant actuarial assumptions used in determining pension and other benefit obligations include the discount rate, the average rate of future compensation increases, the health care cost trend rate and the expected return on plan assets. PG&E Corporation and the Utility review these assumptions on an annual basis and adjust them as necessary. While PG&E Corporation and the Utility believe that the assumptions used are appropriate, significant differences in actual experience, plan changes or amendments, or significant changes in assumptions may materially affect the recorded pension and other postretirement benefit obligations and future plan expenses. See Note 12 of the Notes to the Consolidated Financial Statements in Item 8.

In establishing health care cost assumptions, PG&E Corporation and the Utility consider recent cost trends and projections from industry experts. This evaluation suggests that current rates of inflation are expected to continue in the near term. In recognition of continued high inflation in health care costs and given the design of PG&E Corporation’s plans, the assumed health care cost trend rate for 2022 was 6.0%, gradually decreasing to the ultimate trend rate of approximately 4.5% in 2028 and beyond.

Expected rates of return on plan assets were developed by estimating future stock and bond returns and then applying these returns to the target asset allocations of the employee benefit plan trusts, resulting in a weighted average rate of return on plan assets. Returns on fixed-income debt investments were projected based on real maturity and credit spreads added to a long-term inflation rate. Returns on equity investments were projected based on estimates of dividend yield and real earnings growth added to a long-term inflation rate. For the Utility’s defined benefit pension plan, the assumed return of 5.5% compares to a ten-year actual return of 9.6%.

The rate used to discount pension benefits and other benefits was based on a yield curve developed from market data of approximately 817 Aa-grade non-callable bonds at December 31, 2021. This yield curve has discount rates that vary based on the duration of the obligations. The estimated future cash flows for the pension and other postretirement benefit obligations were matched to the corresponding rates on the yield curve to derive a weighted average discount rate.

The following reflects the sensitivity of pension costs and projected benefit obligation to changes in certain actuarial assumptions:

*(in millions)*

|  | Increase (Decrease) in Assumption | Increase in 2021 Pension Costs | Increase in Projected Benefit Obligation at December 31, 2021 |
| --- | ---: | ---: | ---: |
| Discount rate | (0.50)% | $111 | $1,872 |
| Rate of return on plan assets | (0.50)% | 103 | — |
| Rate of increase in compensation | 0.50% | 51 | 403 |

The following reflects the sensitivity of other postretirement benefit costs and accumulated benefit obligation to changes in certain actuarial assumptions:

*(in millions)*

|  | Increase (Decrease) in Assumption | Increase in 2021 Other Postretirement Benefit Costs | Increase in Accumulated Benefit Obligation at December 31, 2021 |
| --- | ---: | ---: | ---: |
| Health care cost trend rate | 0.50% | $9 | $58 |
| Discount rate | (0.50)% | 12 | 138 |
| Rate of return on plan assets | (0.50)% | 15 | — |

### NEW ACCOUNTING PRONOUNCEMENTS

See Note 3 of the Notes to the Consolidated Financial Statements in Item 8.

## Market risk

As filed, 242 characters.

Information responding to Item 7A is set forth under the heading “Risk Management Activities,” in MD&A in Item 7 and in Note 10: Derivatives and Note 11: Fair Value Measurements of the Notes to the Consolidated Financial Statements in Item 8.

## Controls and procedures

As filed, 2,208 characters.

### Evaluation of Disclosure Controls and Procedures

Based on an evaluation of PG&E Corporation’s and the Utility’s disclosure controls and procedures as of December 31, 2021, PG&E Corporation’s and the Utility’s respective principal executive officers and principal financial officers have concluded that such controls and procedures are effective to ensure that information required to be disclosed by PG&E Corporation and the Utility in reports that the companies file or submit under the 1934 Act is (i) recorded, processed, summarized, and reported within the time periods specified in the SEC rules and forms, and (ii) accumulated and communicated to PG&E Corporation’s and the Utility’s management, including PG&E Corporation’s and the Utility’s respective principal executive officers and principal financial officers, or persons performing similar functions, as appropriate to allow timely decisions regarding required disclosure.

### Management’s Annual Report on Internal Control over Financial Reporting

Management of PG&E Corporation and the Utility have prepared an annual report on internal control over financial reporting. Management’s report, together with the report of the independent registered public accounting firm, appears in Item 8 of this 2021 Form 10-K under the heading “Management’s Report on Internal Control Over Financial Reporting” and “Report of Independent Registered Public Accounting Firm.”

### Registered Public Accounting Firm’s Report on Internal Control over Financial Reporting

Deloitte & Touche LLP, an independent registered public accounting firm, has audited PG&E Corporation’s and the Utility’s internal control over financial reporting as of December 31, 2021, based on criteria established in *Internal Control — Integrated Framework (2013)* issued by the Committee of Sponsoring Organizations of the Treadway Commission.

### Changes in Internal Control over Financial Reporting

There were no changes in internal control over financial reporting that occurred during the quarter ended December 31, 2021 that have materially affected, or are reasonably likely to materially affect, PG&E Corporation’s or the Utility’s internal control over financial reporting.

Filed Feb 10, 2022.
Source: SEC EDGAR, the filing index for accession 0001004980-22-000009. Last ingested by Listed: Nov 14, 2026, 23:58 ET. No prices; not investment advice.