# Firstenergy Corp: Form 10-Q for the period ended Jun 30, 2019

- Company: [Firstenergy Corp](/companies/fe.md) (CIK 1031296)
- Form: 10-Q
- Filed: 2019-07-23
- Accepted by EDGAR: Jul 23, 2019, 16:59 ET
- Period: 2019-06-30
- Accession: 0001031296-19-000034
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/1031296/000103129619000034/fe-06302019x10q.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/1031296/000103129619000034/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2019-06-30.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2019-04-01 to 2019-06-30 | $2.45bn | us-gaap:RevenueFromContractWithCustomerExcludingAssessedTax |
| Revenue | 6 months, 2019-01-01 to 2019-06-30 | $5.25bn | us-gaap:RevenueFromContractWithCustomerExcludingAssessedTax |
| Operating income | 3 months, 2019-04-01 to 2019-06-30 | $585.0m | us-gaap:OperatingIncomeLoss |
| Operating income | 6 months, 2019-01-01 to 2019-06-30 | $1.21bn | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2019-04-01 to 2019-06-30 | $259.0m | us-gaap:InterestExpense |
| Interest expense | 6 months, 2019-01-01 to 2019-06-30 | $512.0m | us-gaap:InterestExpense |
| Income tax | 3 months, 2019-04-01 to 2019-06-30 | $81.0m | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 6 months, 2019-01-01 to 2019-06-30 | $174.0m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2019-04-01 to 2019-06-30 | $312.0m | us-gaap:NetIncomeLoss |
| Net income | 6 months, 2019-01-01 to 2019-06-30 | $632.0m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2019-04-01 to 2019-06-30 | $0.58 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 6 months, 2019-01-01 to 2019-06-30 | $1.17 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2019-04-01 to 2019-06-30 | $0.58 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 6 months, 2019-01-01 to 2019-06-30 | $1.17 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2019-04-01 to 2019-06-30 | 533,000,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 6 months, 2019-01-01 to 2019-06-30 | 533,000,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 6 months, 2019-01-01 to 2019-06-30 | $625.0m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 3 months, 2019-04-01 to 2019-06-30 | $674.0m | us-gaap:PaymentsToAcquireProductiveAssets |
| Capital expenditure | 6 months, 2019-01-01 to 2019-06-30 | $1.23bn | us-gaap:PaymentsToAcquireProductiveAssets |
| Dividends paid | 6 months, 2019-01-01 to 2019-06-30 | $403.0m | us-gaap:PaymentsOfDividendsCommonStock |
| Cash and equivalents | at 2019-06-30 | $422.0m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2019-06-30 | $2.39bn | us-gaap:AssetsCurrent |
| Total assets | at 2019-06-30 | $40.88bn | us-gaap:Assets |
| Current liabilities | at 2019-06-30 | $3.98bn | us-gaap:LiabilitiesCurrent |
| Short-term borrowings | at 2019-06-30 | $1.25bn | us-gaap:ShortTermBorrowings |
| Shareholders' equity | at 2019-06-30 | $7.27bn | us-gaap:StockholdersEquity |
| Shares outstanding | at 2019-06-30 | 532,092,829 shares | dei:EntityCommonStockSharesOutstanding |

## Management's discussion and analysis

As filed, 143,054 characters.

### MANAGEMENT’S DISCUSSION AND ANALYSIS OF

### FINANCIAL CONDITION AND RESULTS OF OPERATIONS

### FIRSTENERGY’S BUSINESS

FE and its subsidiaries are principally involved in the transmission, distribution and generation of electricity through its reportable segments, Regulated Distribution and Regulated Transmission.

On March 31, 2018, FirstEnergy deconsolidated FES and FENOC and presented FES, FENOC, BSPC and a portion of AE Supply, representing substantially all of FirstEnergy’s operations that previously comprised the CES reportable operating segment, as discontinued operations in FirstEnergy’s consolidated financial statements resulting from actions taken as part of the strategic review to exit commodity-exposed generation. The financial information for all periods has been revised to present the discontinued operations within Reconciling Adjustments. The remaining business activities that previously comprised the CES reportable operating segment were not material and, as such, have been combined into Corporate/Other for reporting purposes.

The **Regulated Distribution** segment distributes electricity through FirstEnergy’s ten utility operating companies, serving approximately six million customers within 65,000 square miles of Ohio, Pennsylvania, West Virginia, Maryland, New Jersey and New York, and purchases power for its POLR, SOS, SSO and default service requirements in Ohio, Pennsylvania, New Jersey and Maryland. This segment also controls 3,790 MWs of regulated electric generation capacity located primarily in West Virginia, Virginia and New Jersey. The segment’s results reflect the costs of securing and delivering electric generation from transmission facilities to customers, including the deferral and amortization of certain related costs.

The **Regulated Transmission** segment provides transmission infrastructure owned and operated by the Transmission Companies and certain of FirstEnergy’s utilities (JCP&L, MP, PE and WP) to transmit electricity from generation sources to distribution facilities. The segment’s revenues are primarily derived from forward-looking formula rates at the Transmission Companies as well as stated transmission rates at certain of JCP&L, MP, PE and WP. Both the forward-looking formula and stated rates recover costs that the regulatory agencies determine are permitted to be recovered and provide a return on transmission capital investment. Under forward-looking formula rates, the revenue requirement is updated annually based on a projected rate base and projected costs, which is subject to an annual true-up based on actual costs. The segment’s results also reflect the net transmission expenses related to the delivery of electricity on FirstEnergy’s transmission facilities.

The **Corporate/Other** segment reflects corporate support not charged to FE’s subsidiaries, interest expense on FE’s holding company debt and other businesses that do not constitute an operating segment. Additionally, reconciling adjustments for the elimination of inter-segment transactions and discontinued operations are included in Corporate/Other. As of June 30, 2019, 67 MWs of electric generating capacity, representing AE Supply’s OVEC capacity entitlement, was included in continuing operations of the Corporate/Other reportable segment. As of June 30, 2019, Corporate/Other had approximately $7.1 billion of FE holding company debt.

### EXECUTIVE SUMMARY

FirstEnergy’s strategy is to be a fully regulated utility company, focusing on stable and predictable earnings and cash flow from its regulated business units - Regulated Distribution and Regulated Transmission - through delivering enhanced customer service and reliability. Together, the Regulated Distribution and Regulated Transmission businesses are expected to provide stable, predictable earnings and cash flows that support FE’s dividend.

The scale and diversity of the ten Utilities that comprise the Regulated Distribution business uniquely position this business for growth through opportunities for additional investment. Over the past several years, Regulated Distribution has experienced rate base growth through investments that have improved reliability and added operating flexibility to the distribution infrastructure, which provide benefits to the customers and communities those Utilities serve. Based on its current capital plan, which includes $6.2 to $6.7 billion in forecasted capital investments from 2018 through 2021, Regulated Distribution’s rate base growth rate is expected to be approximately 5% from 2018 through 2021. Additionally, this business is exploring other opportunities for growth, including investments in electric system improvement and modernization projects to increase reliability and improve service to customers, as well as exploring opportunities in customer engagement that focus on the electrification of customers’ homes and businesses by providing a full range of products and services.

With approximately 24,500 miles in operations, the Regulated Transmission business is the centerpiece of FirstEnergy’s regulated investment strategy with approximately 80% of its capital investments recovered under the forward-looking formula rates at ATSI, TrAIL and MAIT. Regulated Transmission has also experienced significant growth as part of its *Energizing the Future* transmission plan with plans to invest up to $4.8 billion in capital from 2018 to 2021, which is expected to result in Regulated Transmission rate base growth of approximately 11% through 2021.

As part of the Energizing the Future initiative, a Center for Advanced Technology was opened in Akron, Ohio in April 2019. The 88,000 square feet facility was designed to be a hands-on environment where engineers and technicians can develop and evaluate new technology and grid solutions and simulate a variety of real-world conditions.

FirstEnergy believes there are incremental investment opportunities for its existing transmission infrastructure of over $20 billion beyond those identified through 2021, which are expected to strengthen grid and cyber-security and make the transmission system more reliable, robust, secure and resistant to extreme weather events, with improved operational flexibility.

On December 22, 2017, the President signed the Tax Act into law. Substantially all of the provisions of the Tax Act are effective for taxable years beginning after December 31, 2017. As discussed below, various state regulatory proceedings have been initiated to investigate the impact of the Tax Act on the Utilities’ rates and charges. FirstEnergy continues to work with various state regulatory commissions to determine appropriate changes to customer rates resulting from the Tax Act. Several states have since implemented rate reductions to reflect the impact of the Tax Act, while in the remaining states, FirstEnergy continues to track and apply regulatory accounting treatment for the expected rate impact of changes resulting from the Tax Act. FERC also recently took action to address the impact of the Tax Act on FERC-jurisdictional rates, including transmission and electric wholesale rates. FirstEnergy has reflected the impact of changes to current taxes in its normal update to FERC-jurisdictional transmission rates and will continue to work with FERC regarding whether and how it should address possible changes to transmission and wholesale rates resulting from the Tax Act.

As previously disclosed, on January 22, 2018, FirstEnergy announced a $2.5 billion equity issuance, which included $1.62 billion in mandatorily convertible preferred equity with an initial conversion price of $27.42 per share and $850 million of common equity issued at $28.22 per share. The equity investment strengthened the Company’s balance sheet, supports the company’s transition to a fully regulated utility company and positions FirstEnergy for sustained investment-grade credit metrics. The shares of preferred stock participate in the dividend paid on common stock on an as-converted basis and are non-voting except in certain limited circumstances. Because of this investment, FirstEnergy does not currently anticipate the need to issue additional equity through at least 2021 outside of its regular stock investment and employee benefit plans. As of June 30, 2019, 1,406,178 shares of preferred stock have been converted to 51,282,928 shares of common stock at the option of the holders. On July 22, 2019, 28,302 shares of preferred stock automatically converted into 1,032,165 shares of common stock, and 181,520 shares of preferred stock remained unconverted as the holder reached the 4.9% cap as outlined in the terms of the preferred stock. All remaining outstanding shares of preferred stock will be automatically converted on January 22, 2020.

On March 31, 2018, FirstEnergy’s competitive subsidiary FES and FENOC voluntarily filed petitions under Chapter 11 of the Federal Bankruptcy Code with the U.S. Bankruptcy Court. FirstEnergy and its other subsidiaries - including its Utilities and AE Supply - are not part of the filing and are not subject to the Chapter 11 process. The voluntary bankruptcy filings by the FES Debtors represented a significant event in FirstEnergy’s previously announced strategy to exit the competitive generation business and become a fully regulated utility company with a stronger balance sheet, solid cash flows and more predictable earnings. As a result of the bankruptcy filings, as of March 31, 2018, the FES Debtors were deconsolidated from FirstEnergy’s financial statements. Additionally, the operating results of the FES Debtors, as well as BSPC and a portion of AE Supply (including the Pleasants Power Station) that were subject to completed or pending asset sales, collectively representing substantially all of FirstEnergy’s operations that comprised the CES reportable segment, are presented as discontinued operations. Prior periods have been reclassified to conform with such presentation as discontinued operations.

On April 23, 2018, FirstEnergy and the FES Key Creditor Groups reached an agreement in principle to resolve certain claims by FirstEnergy against the FES Debtors and all claims by the FES Debtors and their creditors against FirstEnergy. On September 26, 2018, the Bankruptcy Court approved a FES Bankruptcy settlement agreement dated August 26, 2018, by and among FirstEnergy, two groups of key FES creditors (collectively, the FES Key Creditor Groups), the FES Debtors and the UCC. The FES Bankruptcy settlement agreement resolves certain claims by FirstEnergy against the FES Debtors and all claims by the FES Debtors and the FES Key Creditor Groups against FirstEnergy, and includes the following terms, among others:

- FE will pay certain pre-petition FES Debtors employee-related obligations, which include unfunded pension obligations and other employee benefits.
- A nonconsensual release of all claims against FirstEnergy by the FES Debtors’ creditors, which was subsequently waived pursuant to the Waiver Agreement, discussed below.
- A $225 million cash payment from FirstEnergy.
- A $628 million aggregate principal amount note issuance by FirstEnergy to the FES Debtors, which may be decreased by the amount, if any, of cash paid by FirstEnergy to the FES Debtors under the Intercompany Income Tax Allocation Agreement for the tax benefits related to the sale or deactivation of certain plants.
- Transfer of the Pleasants Power Station and related assets, including the economic interests therein as of January 1, 2019, and a requirement that FE continue to provide access to the McElroy’s Run CCR Impoundment Facility, which is not being transferred. FE will provide guarantees for certain retained environmental liabilities of AE Supply, including the McElroy’s Run CCR Impoundment Facility
- FirstEnergy agrees to waive all pre-petition claims related to shared services and credit for nine months of the FES Debtors’ shared service costs beginning as of April 1, 2018 through December 31, 2018, in an amount not to exceed $112.5 million, and FirstEnergy agrees to extend the availability of shared services until no later than June 30, 2020.
- FirstEnergy has agreed to fund through its pension plan a pension enhancement, which is subject to a cap, should FES offer a voluntary enhanced retirement package in 2019 and to offer certain other employee benefits (approximately $14 million recognized in 2019).
- FirstEnergy agrees to perform under the Intercompany Tax Allocation Agreement through the FES Debtors’ emergence from bankruptcy, at which time FirstEnergy will waive a 2017 overpayment for NOLs of approximately $71 million, reverse 2018 estimated payments for NOLs of approximately $88 million and pay the FES Debtors for the use of NOLs in an amount no less than $66 million for 2018 (approximately $52 million was paid in 2018, which amount will be finalized after filing the 2018 Federal tax return).

The FES Bankruptcy settlement agreement remains subject to satisfaction of certain conditions, most notably the issuance of a final order by the Bankruptcy Court approving the plan or plans of reorganization for the FES Debtors that are acceptable to FirstEnergy consistent with the requirements of the FES Bankruptcy settlement agreement. There can be no assurance that such conditions will be satisfied or the FES Bankruptcy settlement agreement will be otherwise consummated, and the actual outcome of this matter may differ materially from the terms of the agreement described herein. FirstEnergy will continue to evaluate the impact of any new factors on the settlement and their relative impact on the financial statements.

On April 11, 2019, the Bankruptcy Court entered an order denying the FES Debtors’ disclosure statement approval motion. The Bankruptcy Court concluded that the nonconsensual third-party releases proposed under the plan of reorganization and which were a condition under the FES Bankruptcy settlement agreement for FirstEnergy’s benefit, were legally impermissible and rendered the plan unconfirmable. On April 18, 2019, FirstEnergy consented to the waiver of the condition. Additionally, the FES Debtors agreed to provide FirstEnergy with the same third-party release provided in favor of certain other parties in any plan of reorganization and pay FirstEnergy approximately $60 million in cash (paid during the second quarter of 2019) to resolve certain outstanding pension and service charges totaling $87 million, which resulted in FirstEnergy recognizing a $27 million pre-tax charge to income in the first quarter of 2019 ($17 million of which was recognized in continuing operations). Further, the FES Debtors agreed to initiate negotiations with the EPA, OEPA, PA DEP and the NRC to obtain those parties’ cooperation with the FES Debtors’ revised plan of reorganization. FirstEnergy may choose to participate in those negotiations at its option. On May 20, 2019, the Bankruptcy Court approved the waiver and a revised disclosure statement.

In connection with the FES Bankruptcy settlement agreement, FirstEnergy entered into a separation agreement with the FES Debtors to implement the separation of the FES Debtors and their businesses from FirstEnergy. A business separation committee was established between FirstEnergy and the FES Debtors to review and determine issues that arise in the context of the separation of the FES Debtors’ businesses from those of FirstEnergy.

With the bankruptcy filings of FES and FENOC, and the completed sale of the previously announced competitive Bath hydroelectric station, FirstEnergy’s electric generation fleet is now made up of 3,790 MW of regulated generation, including four plants in West Virginia, Virginia and New Jersey. This excludes AE Supply’s remaining competitive generation assets - the 1,300 MW Pleasants Power Station, which will be transferred to FG pursuant to the settlement agreement, and its 67 MW OVEC capacity entitlement.

### FINANCIAL OVERVIEW AND RESULTS OF OPERATIONS

*(In millions)*

|  | For the Three Months Ended June 30, 2019 | 2018 | Change |  | For the Six Months Ended June 30, 2019 | 2018 | Change |  |
| --- | ---: | ---: | ---: | ---: | ---: | ---: | ---: | ---: |
| Revenues | $2,516 | $2,625 | $(109) | (4)% | $5,399 | $5,487 | $(88) | (2)% |
| Operating expenses | 1,931 | 1,925 | 6 | —% | 4,185 | 4,207 | (22) | (1)% |
| **Operating income** | 585 | 700 | (115) | (16)% | 1,214 | 1,280 | (66) | (5)% |
| Other expenses, net | (163) | (291) | 128 | (44)% | (344) | (457) | 113 | (25)% |
| **Income before income taxes** | 422 | 409 | 13 | 3% | 870 | 823 | 47 | 6% |
| **Income taxes** | 81 | 101 | (20) | (20)% | 174 | 334 | (160) | (48)% |
| **Income from continuing operations** | 341 | 308 | 33 | 11% | 696 | 489 | 207 | 42% |
| Discontinued operations, net of tax | (29) | (9) | (20) | NM | (64) | 1,179 | (1,243) | NM |
| **Net income** | $312 | $299 | $13 | 4% | $632 | $1,668 | $(1,036) | (62)% |

\* NM = not meaningful

The financial results discussed below include revenues and expenses from transactions among FirstEnergy’s business segments. A reconciliation of segment financial results is provided in Note 14, “Segment Information,” of the Notes to Consolidated Financial Statements.

Certain prior year amounts have been reclassified to conform to the current year presentation.

### Summary of Results of Operations — Second Quarter 2019 Compared with Second Quarter 2018

Financial results for FirstEnergy’s business segments in the second quarter of 2019 and 2018 were as follows:

*(In millions)*

| Second Quarter 2019 Financial Results Revenues: | Regulated Distribution | Regulated Transmission | Corporate/Other and Reconciling Adjustments | FirstEnergy Consolidated |
| --- | ---: | ---: | ---: | ---: |
| Electric | $2,131 | $367 | $(32) | $2,466 |
| Other | 61 | 5 | (16) | 50 |
| Total Revenues | 2,192 | 372 | (48) | 2,516 |
| Operating Expenses: |  |  |  |  |
| Fuel | 129 | — | — | 129 |
| Purchased power | 606 | — | 5 | 611 |
| Other operating expenses | 630 | 64 | (88) | 606 |
| Provision for depreciation | 220 | 71 | 18 | 309 |
| Amortization of regulatory assets, net | 34 | 3 | — | 37 |
| General taxes | 177 | 52 | 10 | 239 |
| Total Operating Expenses | 1,796 | 190 | (55) | 1,931 |
| Operating Income | 396 | 182 | 7 | 585 |
| Other Income (Expense): |  |  |  |  |
| Miscellaneous income, net | 46 | 4 | 30 | 80 |
| Interest expense | (124) | (48) | (87) | (259) |
| Capitalized financing costs | 7 | 8 | 1 | 16 |
| Total Other Expense | (71) | (36) | (56) | (163) |
| Income (Loss) Before Income Taxes (Benefits) | 325 | 146 | (49) | 422 |
| Income taxes (benefits) | 67 | 30 | (16) | 81 |
| Income (Loss) From Continuing Operations | 258 | 116 | (33) | 341 |
| Discontinued operations, net of tax | — | — | (29) | (29) |
| Net Income (Loss) | $258 | $116 | $(62) | $312 |

44

*(In millions)*

| Second Quarter 2018 Financial Results Revenues: | Regulated Distribution | Regulated Transmission | Corporate/Other and Reconciling Adjustments | FirstEnergy Consolidated |
| --- | ---: | ---: | ---: | ---: |
| Electric | $2,291 | $336 | $(56) | $2,571 |
| Other | 61 | 5 | (12) | 54 |
| Total Revenues | 2,352 | 341 | (68) | 2,625 |
| Operating Expenses: |  |  |  |  |
| Fuel | 128 | — | — | 128 |
| Purchased power | 699 | — | (2) | 697 |
| Other operating expenses | 666 | 60 | (42) | 684 |
| Provision for depreciation | 200 | 62 | 21 | 283 |
| Deferral of regulatory assets, net | (107) | — | — | (107) |
| General taxes | 184 | 48 | 8 | 240 |
| Total Operating Expenses | 1,770 | 170 | (15) | 1,925 |
| Operating Income (Loss) | 582 | 171 | (53) | 700 |
| Other Income (Expense): |  |  |  |  |
| Miscellaneous income (expense), net | 56 | 3 | (11) | 48 |
| Interest expense | (129) | (42) | (184) | (355) |
| Capitalized financing costs | 6 | 10 | — | 16 |
| Total Other Expense | (67) | (29) | (195) | (291) |
| Income (Loss) Before Income Taxes (Benefits) | 515 | 142 | (248) | 409 |
| Income taxes (benefits) | 138 | 38 | (75) | 101 |
| Income (Loss) From Continuing Operations | 377 | 104 | (173) | 308 |
| Discontinued operations, net of tax | — | — | (9) | (9) |
| Net Income (Loss) | $377 | $104 | $(182) | $299 |

45

*(In millions)*

| Changes Between Second Quarter 2019 and Second Quarter 2018 Financial Results Revenues: | Regulated Distribution | Regulated Transmission | Corporate/Other and Reconciling Adjustments | FirstEnergy Consolidated |
| --- | ---: | ---: | ---: | ---: |
| Electric | $(160) | $31 | $24 | $(105) |
| Other | — | — | (4) | (4) |
| Total Revenues | (160) | 31 | 20 | (109) |
| Operating Expenses: |  |  |  |  |
| Fuel | 1 | — | — | 1 |
| Purchased power | (93) | — | 7 | (86) |
| Other operating expenses | (36) | 4 | (46) | (78) |
| Provision for depreciation | 20 | 9 | (3) | 26 |
| Amortization (deferral) of regulatory assets, net | 141 | 3 | — | 144 |
| General taxes | (7) | 4 | 2 | (1) |
| Total Operating Expenses | 26 | 20 | (40) | 6 |
| Operating Income (Loss) | (186) | 11 | 60 | (115) |
| Other Income (Expense): |  |  |  |  |
| Miscellaneous income, net | (10) | 1 | 41 | 32 |
| Interest expense | 5 | (6) | 97 | 96 |
| Capitalized financing costs | 1 | (2) | 1 | — |
| Total Other Expense | (4) | (7) | 139 | 128 |
| Income (Loss) Before Income Taxes (Benefits) | (190) | 4 | 199 | 13 |
| Income taxes (benefits) | (71) | (8) | 59 | (20) |
| Income (Loss) From Continuing Operations | (119) | 12 | 140 | 33 |
| Discontinued operations, net of tax | — | — | (20) | (20) |
| Net Income (Loss) | $(119) | $12 | $120 | $13 |

46

### Regulated Distribution — Second Quarter 2019 Compared with Second Quarter 2018

Regulated Distribution’s operating results decreased $119 million in the second quarter of 2019, as compared to the same period of 2018, primarily reflecting the absence of the reversal of a reserve on recoverability of certain REC purchases in Ohio, the net impact of a FERC settlement that reallocated certain transmission costs, and lower revenues associated with decreased weather-related usage.

#### Revenues —

The $160 million decrease in total revenues resulted from the following sources:

*(In millions)*

| Revenues by Type of Service | For the Three Months Ended June 30, 2019 | 2018 | Decrease |
| --- | ---: | ---: | ---: |
| Distribution services(1) | $1,215 | $1,288 | $(73) |
| Generation sales: |  |  |  |
| Retail | 806 | 882 | (76) |
| Wholesale | 110 | 121 | (11) |
| Total generation sales | 916 | 1,003 | (87) |
| Other | 61 | 61 | — |
| **Total Revenues** | $2,192 | $2,352 | $(160) |

(1) Includes $55 million and $60 million of ARP revenues for the three months ended June 30, 2019 and 2018, respectively.

Distribution services revenues decreased $73 million in the second quarter of 2019, as compared to the same period of 2018, primarily resulting from lower weather-related customer usage and the implementation of rate orders and settlements related to the Tax Act. Distribution deliveries by customer class are summarized in the following table:

*(In thousands)*

| Electric Distribution MWH Deliveries | For the Three Months Ended June 30, 2019 | 2018 | Decrease |
| --- | ---: | ---: | ---: |
| Residential | 10,900 | 12,074 | (9.7)% |
| Commercial | 9,622 | 10,197 | (5.6)% |
| Industrial | 12,976 | 13,201 | (1.7)% |
| Other | 138 | 140 | (1.4)% |
| **Total Electric Distribution MWH Deliveries** | 33,636 | 35,612 | (5.5)% |

Lower distribution deliveries to residential and commercial customers primarily reflect lower weather-related usage resulting from cooling degree days that were 28% below 2018, and 4% below normal, as well as heating degree days that were 23% below 2018, and 20% below normal. Deliveries to industrial customers reflect higher shale customer usage offset by lower steel and automotive customer usage.

The following table summarizes the price and volume factors contributing to the $87 million decrease in generation revenues for the second quarter of 2019, as compared to the same period of 2018:

*(In millions)*

| Source of Change in Generation Revenues Retail: | Increase (Decrease) |
| --- | ---: |
| Change in sales volumes | $(44) |
| Change in prices | (32) |
|  | (76) |
| Wholesale: |  |
| Change in sales volumes | (16) |
| Change in prices | 6 |
| Capacity revenue | (1) |
|  | (11) |
| Decrease in Generation Revenues | $(87) |

The decrease in retail generation sales volumes was primarily due to lower weather-related usage, as described above. Total generation provided by alternative suppliers as a percentage of total MWH deliveries was flat. The decrease in retail generation prices primarily resulted from a lower ENEC rate in West Virginia and rate reductions resulting from the Tax Act.

Wholesale generation revenues decreased $11 million in the second quarter of 2019, as compared to the same period in 2018, primarily due to lower wholesale sales volumes related to lower generation output. The difference between current wholesale generation revenues and certain energy costs incurred are deferred for future recovery or refund, with no material impact to earnings.

#### Operating Expenses —

Total operating expenses increased $26 million in the second quarter of 2019, as compared to the same period of 2018, primarily due to the following:

- Purchased power costs were $93 million lower in the second quarter of 2019, as compared to the same period in 2018, primarily due to lower customer weather-related usage and lower unit costs, partially offset by the implementation of the NJ Zero Emission Program in June 2019.

*(In millions)*

| Source of Change in Purchased Power Purchases from non-affiliates: | Increase (Decrease) |
| --- | ---: |
| Change due to decreased unit costs | $(46) |
| Change due to volumes | (19) |
|  | (65) |
| Purchases from affiliates: |  |
| Change due to decreased unit costs | (2) |
| Change due to volumes | (27) |
|  | (29) |
| Capacity expense | 1 |
| Decrease in Purchased Power Costs | $(93) |

48

- Other operating expenses decreased $36 million in the second quarter of 2019, as compared to the same period of 2018, primarily due to the following:
- Decreased storm restoration costs of $30 million, which were mostly deferred for future recovery, resulting in no material impact on current period earnings.
- Lower operating and maintenance expense of $41 million, primarily associated with lower employee benefit and corporate support costs, lower regulated generation maintenance activities and transactions now accounted for as finance leases. As a result of the adoption of the new lease accounting standard, financing lease expenses that were recognized in other operating expenses are now recognized in depreciation and interest expense in 2019.
- Lower energy efficiency program costs of $5 million, which are deferred for future recovery, resulting in no material impact on current period earnings.
- Higher network transmission expenses of $40 million, reflecting increased transmission costs as well as the absence of the FERC settlement during the second quarter of 2018, which reallocated certain transmission costs across utilities in PJM and resulted in a refund to the Ohio Companies. Except for certain transmission costs and credits at the Ohio Companies recognized in 2018, the difference between current revenues and transmission costs incurred are deferred for future recovery or refund, resulting in no material impact on current period earnings.
- Depreciation expense increased $20 million in the second quarter of 2019, as compared to the same period of 2018, primarily due to a higher asset base and transactions now accounted for as finance leases, as discussed above.
- Amortization expense increased $141 million in the second quarter of 2019, as compared to the same period of 2018, primarily due to lower storm restoration cost deferrals, the absence of the reversal of a liability at the Ohio Companies for an Ohio Supreme Court ruling regarding the purchase of RECs that occurred in 2018, as well as lower deferrals of generation and transmission expenses, including the FERC settlement discussed above.

#### Other Expense —

Other Expense increased $4 million in the second quarter of 2019, as compared to the same period of 2018, primarily due to lower net miscellaneous income resulting from higher pension and OPEB non-service costs. Interest expense decreased due to lower expense from debt maturities and refinancings and higher capitalized financing costs, partially offset by transactions now accounted for as finance leases, as discussed above.

#### Income Taxes —

Regulated Distribution’s effective tax rate was 20.6% and 26.8% for the three months ended June 30, 2019 and 2018, respectively. The lower effective tax rate in 2019 was primarily due to the amortization of net excess deferred income taxes resulting from Tax Act settlements and orders with certain regulatory commissions since June 30, 2018, and the remeasurement of uncertain tax positions during the second quarter of 2019.

### Regulated Transmission — Second Quarter 2019 Compared with Second Quarter 2018

Regulated Transmission’s operating results increased $12 million in the second quarter of 2019, as compared to the same period of 2018, primarily due to the impact of a higher rate base at ATSI and MAIT, partially offset by a lower rate base at TrAIL.

#### Revenues —

Total revenues increased $31 million in the second quarter of 2019, as compared to the same period of 2018, primarily due to recovery of incremental operating expenses and a higher rate base at ATSI and MAIT, partially offset by a lower rate base at TrAIL.

The following table shows revenues by transmission asset owner:

*(In millions)*

| Revenues by Transmission Asset Owner | For the Three Months Ended June 30, 2019 | 2018 | Increase (Decrease) |
| --- | ---: | ---: | ---: |
| ATSI | $185 | $168 | $17 |
| TrAIL | 61 | 65 | (4) |
| MAIT | 51 | 35 | 16 |
| Other | 75 | 73 | 2 |
| Total Revenues | $372 | $341 | $31 |

49

#### Operating Expenses —

Total operating expenses increased $20 million in the second quarter of 2019, as compared to the same period of 2018, primarily due to higher operating and maintenance expenses as well as higher property taxes and depreciation due to a higher asset base. The majority of the increases were recovered through formula rates at ATSI and MAIT, resulting in no material impact on current period earnings.

#### Income Taxes —

Regulated Transmission’s effective tax rate was 20.5% and 26.8% for the three months ended June 30, 2019 and 2018, respectively. The lower effective tax rate in 2019 was primarily due to the amortization of net excess deferred income taxes resulting from FERC guidance related to the Tax Act occurring since June 30, 2018.

### Corporate / Other — Second Quarter 2019 Compared with Second Quarter 2018

Financial results from the Corporate/Other operating segment resulted in a $140 million increase in income from continuing operations in the second quarter of 2019, as compared to the same period of 2018, primarily due to lower interest expense of $97 million from the absence of make-whole payments and higher net miscellaneous income from higher returns on certain equity method investments and lower non-operating expenses.

For the three months ended June 30, 2019 and 2018, FirstEnergy recorded a loss from discontinued operations, net of tax of $29 million and $9 million, respectively.

### Summary of Results of Operations — First Six Months of 2019 Compared with First Six Months of 2018

Financial results for FirstEnergy’s business segments in the first six months of 2019 and 2018 were as follows:

*(In millions)*

| First Six Months 2019 Financial Results Revenues: | Regulated Distribution | Regulated Transmission | Corporate/Other and Reconciling Adjustments | FirstEnergy Consolidated |
| --- | ---: | ---: | ---: | ---: |
| Electric | $4,643 | $719 | $(63) | $5,299 |
| Other | 122 | 9 | (31) | 100 |
| Total Revenues | 4,765 | 728 | (94) | 5,399 |
| Operating Expenses: |  |  |  |  |
| Fuel | 260 | — | — | 260 |
| Purchased power | 1,383 | — | 9 | 1,392 |
| Other operating expenses | 1,401 | 130 | (146) | 1,385 |
| Provision for depreciation | 429 | 140 | 37 | 606 |
| Amortization of regulatory assets, net | 37 | 5 | — | 42 |
| General taxes | 375 | 103 | 22 | 500 |
| Total Operating Expenses | 3,885 | 378 | (78) | 4,185 |
| Operating Income (Loss) | 880 | 350 | (16) | 1,214 |
| Other Income (Expense): |  |  |  |  |
| Miscellaneous income, net | 92 | 8 | 34 | 134 |
| Interest expense | (246) | (93) | (173) | (512) |
| Capitalized financing costs | 17 | 16 | 1 | 34 |
| Total Other Expense | (137) | (69) | (138) | (344) |
| Income (Loss) Before Income Taxes (Benefits) | 743 | 281 | (154) | 870 |
| Income taxes (benefits) | 156 | 61 | (43) | 174 |
| Income (Loss) From Continuing Operations | 587 | 220 | (111) | 696 |
| Discontinued operations, net of tax | — | — | (64) | (64) |
| Net Income (Loss) | $587 | $220 | $(175) | $632 |

51

*(In millions)*

| First Six Months 2018 Financial Results Revenues: | Regulated Distribution | Regulated Transmission | Corporate/Other and Reconciling Adjustments | FirstEnergy Consolidated |
| --- | ---: | ---: | ---: | ---: |
| Electric | $4,799 | $655 | $(77) | $5,377 |
| Other | 129 | 9 | (28) | 110 |
| Total Revenues | 4,928 | 664 | (105) | 5,487 |
| Operating Expenses: |  |  |  |  |
| Fuel | 267 | — | — | 267 |
| Purchased power | 1,518 | — | (1) | 1,517 |
| Other operating expenses | 1,564 | 114 | (54) | 1,624 |
| Provision for depreciation | 396 | 123 | 41 | 560 |
| Amortization (deferral) of regulatory assets, net | (259) | 4 | — | (255) |
| General taxes | 379 | 95 | 20 | 494 |
| Total Operating Expenses | 3,865 | 336 | 6 | 4,207 |
| Operating Income (Loss) | 1,063 | 328 | (111) | 1,280 |
| Other Income (Expense): |  |  |  |  |
| Miscellaneous income (expense), net | 112 | 7 | (4) | 115 |
| Interest expense | (257) | (81) | (265) | (603) |
| Capitalized financing costs | 12 | 19 | — | 31 |
| Total Other Expense | (133) | (55) | (269) | (457) |
| Income (Loss) Before Income Taxes | 930 | 273 | (380) | 823 |
| Income taxes | 231 | 70 | 33 | 334 |
| Income (Loss) From Continuing Operations | 699 | 203 | (413) | 489 |
| Discontinued operations, net of tax | — | — | 1,179 | 1,179 |
| Net Income | $699 | $203 | $766 | $1,668 |

52

*(In millions)*

| Changes Between First Six Months 2019 and First Six Months 2018 Financial Results Revenues: | Regulated Distribution | Regulated Transmission | Corporate/Other and Reconciling Adjustments | FirstEnergy Consolidated |
| --- | ---: | ---: | ---: | ---: |
| Electric | $(156) | $64 | $14 | $(78) |
| Other | (7) | — | (3) | (10) |
| Total Revenues | (163) | 64 | 11 | (88) |
| Operating Expenses: |  |  |  |  |
| Fuel | (7) | — | — | (7) |
| Purchased power | (135) | — | 10 | (125) |
| Other operating expenses | (163) | 16 | (92) | (239) |
| Provision for depreciation | 33 | 17 | (4) | 46 |
| Amortization (deferral) of regulatory assets, net | 296 | 1 | — | 297 |
| General taxes | (4) | 8 | 2 | 6 |
| Total Operating Expenses | 20 | 42 | (84) | (22) |
| Operating Income (Loss) | (183) | 22 | 95 | (66) |
| Other Income (Expense): |  |  |  |  |
| Miscellaneous income (expense), net | (20) | 1 | 38 | 19 |
| Interest expense | 11 | (12) | 92 | 91 |
| Capitalized financing costs | 5 | (3) | 1 | 3 |
| Total Other Expense | (4) | (14) | 131 | 113 |
| Income (Loss) Before Income Taxes (Benefits) | (187) | 8 | 226 | 47 |
| Income taxes (benefits) | (75) | (9) | (76) | (160) |
| Income (Loss) From Continuing Operations | (112) | 17 | 302 | 207 |
| Discontinued operations, net of tax | — | — | (1,243) | (1,243) |
| Net Income (Loss) | $(112) | $17 | $(941) | $(1,036) |

53

### Regulated Distribution — First Six Months of 2019 Compared with First Six Months of 2018

Regulated Distribution’s net income decreased $112 million in the first six months of 2019, as compared to the same period of 2018, primarily reflecting the absence of the reversal of a reserve on recoverability of certain REC purchases in Ohio, the net impact of a FERC settlement that reallocated certain transmission costs, and lower revenues associated with decreased weather-related usage.

#### Revenues —

The $163 million decrease in total revenues resulted from the following sources:

*(In millions)*

| Revenues by Type of Service | For the Six Months Ended June 30, 2019 | 2018 | Decrease |
| --- | ---: | ---: | ---: |
| Distribution services(1) | $2,563 | $2,633 | $(70) |
| Generation sales: |  |  |  |
| Retail | 1,864 | 1,922 | (58) |
| Wholesale | 216 | 244 | (28) |
| Total generation sales | 2,080 | 2,166 | (86) |
| Other | 122 | 129 | (7) |
| **Total Revenues** | $4,765 | $4,928 | $(163) |

(1) Includes $117 million and $124 million of ARP revenues for the six months ended June 30, 2019 and 2018, respectively.

Distribution services revenues decreased $70 million in the first six months of 2019, as compared to the same period of 2018, primarily resulting from lower weather-related customer usage and the implementation of rate orders and settlements related to the Tax Act. Distribution deliveries by customer class are summarized in the following table:

*(In thousands)*

| Electric Distribution MWH Deliveries | For the Six Months Ended June 30, 2019 | 2018 | Decrease |
| --- | ---: | ---: | ---: |
| Residential | 26,003 | 27,073 | (4.0)% |
| Commercial | 20,002 | 20,723 | (3.5)% |
| Industrial | 26,032 | 26,275 | (0.9)% |
| Other | 279 | 281 | (0.7)% |
| **Total Electric Distribution MWH Deliveries** | 72,316 | 74,352 | (2.7)% |

Lower distribution deliveries to residential and commercial customers primarily reflect lower weather-related usage resulting from cooling degree days that were 28% below 2018, and 4% below normal, as well as, heating degree days that were 3% below 2018, and 4% below normal. Deliveries to industrial customers reflect higher shale customer usage offset by lower steel and automotive customer usage.

The following table summarizes the price and volume factors contributing to the $86 million decrease in generation revenues for the first six months of 2019, as compared to the same period of 2018:

*(In millions)*

| Source of Change in Generation Revenues Retail: | Increase (Decrease) |
| --- | ---: |
| Change in sales volumes | $2 |
| Change in prices | (60) |
|  | (58) |
| Wholesale: |  |
| Change in sales volumes | (32) |
| Change in prices | (4) |
| Capacity Revenue | 8 |
|  | (28) |
| Decrease in Generation Revenues | $(86) |

The change in retail generation sales volumes was primarily due to lower customer weather-related usage, offset by decreased customer shopping in New Jersey and Pennsylvania. Total generation provided by alternative suppliers as a percentage of total MWH deliveries decreased to 49% from 52% in New Jersey and to 66% from 67% in Pennsylvania. The decrease in retail generation prices primarily resulted from a lower ENEC rate in West Virginia and rate reductions resulting from the Tax Act.

Wholesale generation revenues decreased $28 million in the first six months of 2019, as compared to the same period in 2018, primarily due to lower wholesale sales volumes related to lower generation output. The difference between current wholesale generation revenues and certain energy costs incurred are deferred for future recovery or refund, with no material impact to earnings.

#### Operating Expenses —

Total operating expenses increased $20 million, primarily due to the following:

- Fuel costs were $7 million lower during the first six months of 2019, as compared to the same period of 2018, primarily due to lower unit costs.
- Purchased power costs decreased $135 million during the first six months of 2019, as compared to the same period of 2018, primarily due to lower unit costs and lower customer weather-related usage, partially offset by the implementation of the NJ Zero Emission Program in June 2019.

*(In millions)*

| Source of Change in Purchased Power Purchases from non-affiliates: | Increase (Decrease) |
| --- | ---: |
| Change due to decreased unit costs | $(108) |
| Change due to volumes | 10 |
|  | (98) |
| Purchases from affiliates: |  |
| Change due to decreased unit costs | (3) |
| Change due to volumes | (46) |
|  | (49) |
| Capacity | 12 |
| Decrease in Purchased Power Costs | $(135) |

55

- Other operating expenses decreased $163 million in the first six months of 2019, as compared to the same period of 2018, primarily due to:
- Decreased storm restoration costs of $146 million, which were deferred for future recovery, resulting in no material impact on current period earnings.
- Higher net network transmission expenses of $38 million, reflecting increased transmission costs as well as the absence of the FERC settlement during the second quarter of 2018, which reallocated certain transmission costs across utilities in PJM and resulted in a refund to the Ohio Companies. Except for certain transmission costs and credits at the Ohio Companies recognized in 2018, the difference between current revenues and transmission costs incurred are deferred for future recovery or refund, resulting in no material impact on current period earnings.
- Lower energy efficiency and other program costs of $16 million, which are deferred for future recovery, resulting in no material impact on current period earnings.
- Lower operating and maintenance expenses of $39 million, primarily associated with lower employee benefit and general corporate support costs, lower regulated generation maintenance activities and transactions now accounted for as finance leases. As a result of the adoption of the new lease accounting standard, financing lease expenses that were recognized in other operating expenses are now recognized in depreciation and interest expense in 2019.
- Depreciation expense increased $33 million in the first six months of 2019, as compared to the same period of 2018, primarily due to a higher rate base and transactions now accounted for as finance leases, as discussed above.
- Amortization expense increased $296 million in the first six months of 2019, as compared to the same period of 2018, primarily due to decreased deferral of storm restoration costs, the absence of the reversal of a liability at the Ohio Companies for an Ohio Supreme Court ruling regarding purchase of RECs, as well as lower deferrals of generation and transmission expenses, including the FERC settlement discussed above.

#### Other Expense —

Total other expense increased $4 million in the first six months of 2019, as compared to the same period of 2018, primarily due lower miscellaneous income due to higher pension and OPEB non-service costs. Interest expense decreased primarily due to lower expense from debt maturities and refinancings, and higher capitalized financing costs, partially offset by transactions now accounted for as finance leases, as discussed above.

#### Income Taxes —

Regulated Distribution’s effective tax rate was 21.0% and 24.8% for the six months ended June 30, 2019 and 2018, respectively. The lower effective tax rate in 2019 was primarily due to the amortization of net excess deferred income taxes resulting from Tax Act settlements and orders with certain regulatory commissions since June 30, 2018, and the remeasurement of uncertain tax positions during the second quarter of 2019.

### Regulated Transmission — First Six Months of 2019 Compared with First Six Months of 2018

Regulated Transmission’s net income increased $17 million in the first six months of 2019, as compared to the same period of 2018, primarily resulting from the impact of a higher rate base at ATSI and MAIT, partially offset by a lower rate base at TrAIL.

#### Revenues —

Total revenues increased $64 million, primarily due to the recovery of incremental operating expenses and a higher rate base at ATSI and MAIT, partially offset by a lower rate base at TrAIL.

The following table shows revenues by transmission asset owner:

*(In millions)*

| Revenues by Transmission Asset Owner | For the Six Months Ended June 30, 2019 | 2018 | Increase (Decrease) |
| --- | ---: | ---: | ---: |
| ATSI | $360 | $327 | $33 |
| TrAIL | 121 | 127 | (6) |
| MAIT | 101 | 66 | 35 |
| Other | 146 | 144 | 2 |
| Total Revenues | $728 | $664 | $64 |

56

#### Operating Expenses —

Total operating expenses increased $42 million in the first six months of 2019, as compared to the same period of 2018, primarily due to higher operating and maintenance expenses as well as higher property taxes and depreciation due to a higher asset base. The majority of the increases were recovered through formula rates at ATSI and MAIT, resulting in no material impact on current period earnings.

#### Other Expense —

Total other expense increased $14 million in the first six months of 2019, as compared to the same period of 2018, primarily due to higher interest expense associated with new debt issuances at MAIT and FET.

#### Income Taxes —

Regulated Transmission’s effective tax rate was 21.7% and 25.6% for the six months ended June 30, 2019 and 2018, respectively. The lower effective tax rate in 2019 was primarily due to the amortization of net excess deferred income taxes resulting from FERC guidance related to the Tax Act occurring since June 30, 2018.

### Corporate / Other — First Six Months of 2019 Compared with First Six Months of 2018

Financial results from the Corporate/Other operating segment and reconciling adjustments resulted in a $302 million increase in income from continuing operations in the first six months of 2019, as compared to the same period of 2018, primarily due to lower income taxes from the absence of a $126 million charge in the first quarter of 2018 associated with the remeasurement of state deferred taxes in West Virginia when FES and FENOC were removed from the unitary group following their bankruptcy filing on March 31, 2018. Lower interest expense of $92 million was due to the absence of make-whole payments, and lower other operating expenses of $92 million was primarily due to lower incurred corporate support costs in continuing operations related to FES and FENOC. Although the operations of FES and FENOC for the first quarter of 2018 (prior to deconsolidation on March 31, 2018) are reflected as discontinued operations, certain allocated corporate support costs to FES and FENOC continue to be reflected in continued operations. Additionally, higher net miscellaneous income was primarily due to higher returns on certain equity method investments and lower non-operating expenses.

For the six months ended June 30, 2019, FirstEnergy recorded a loss from discontinued operations, net of tax of $64 million compared to income of $1,179 million, for the six months ended June 30, 2018. The change in discontinued operations, net of tax was primarily due to the absence of a $1.2 billion gain on deconsolidation of FES and FENOC recorded in the first quarter of 2018 following their bankruptcy filing on March 31, 2018.

### Regulatory Assets and Liabilities

Regulatory assets represent incurred costs that have been deferred because of their probable future recovery from customers through regulated rates. Regulatory liabilities represent amounts that are expected to be credited to customers through future regulated rates or amounts collected from customers for costs not yet incurred. FirstEnergy, the Utilities and the Transmission Companies net their regulatory assets and liabilities based on federal and state jurisdictions.

The following table provides information about the composition of net regulatory assets and liabilities as of June 30, 2019, and December 31, 2018, and the changes during the six months ended June 30, 2019:

*(In millions)*

| Net Regulatory Assets (Liabilities) by Source | June 30, 2019 | December 31, 2018 | Change |
| --- | ---: | ---: | ---: |
| Regulatory transition costs | $(11) | $49 | $(60) |
| Customer payables for future income taxes | (2,708) | (2,725) | 17 |
| Nuclear decommissioning and spent fuel disposal costs | (194) | (148) | (46) |
| Asset removal costs | (770) | (787) | 17 |
| Deferred transmission costs | 167 | 170 | (3) |
| Deferred generation costs | 197 | 202 | (5) |
| Deferred distribution costs | 182 | 208 | (26) |
| Contract valuations | 62 | 62 | — |
| Storm-related costs | 537 | 500 | 37 |
| Other | 48 | 62 | (14) |
| Net Regulatory Liabilities included on the Consolidated Balance Sheets | $(2,490) | $(2,407) | $(83) |

57

The following is a description of the regulatory assets and liabilities described above:

**Regulatory transition costs** - Includes the recovery of PN above-market NUG costs; JCP&L costs incurred during the transition to a competitive retail market and under-recovered during the period from August 1, 1999 through July 31, 2003; and JCP&L costs associated with basic generation service, capacity and ancillary services, net of revenues from the sale of the committed supply in the wholesale market. Amounts are amortized through 2021.

**Customer payables for future income taxes** - Reflects amounts to be recovered or refunded through future rates to pay income taxes that become payable when rate revenue is provided to recover items such as AFUDC-equity and depreciation of property, plant and equipment for which deferred income taxes were not recognized for ratemaking purposes, including amounts attributable to tax rate changes such as tax reform. These amounts are being amortized over the period in which the related deferred tax assets reverse, which is generally over the expected life of the underlying asset.

**Nuclear decommissioning and spent fuel disposal costs** - Reflects a regulatory liability representing amounts collected from customers and placed in external trusts including income, losses and changes in fair value thereon (as well as accretion of the related ARO) primarily for the future decommissioning of TMI-2.

**Asset removal costs** - Primarily represents the rates charged to customers that include a provision for the cost of future activities to remove assets, including obligations for which an ARO has been recognized, that are expected to be incurred at the time of retirement.

**Deferred transmission costs** - Principally represents differences between revenues earned based on actual costs for the formula-rate Transmission Companies and the amounts billed. Amounts are recorded as a regulatory asset or liability and recovered or refunded, respectively, in subsequent periods.

**Deferred generation costs** - Primarily relates to regulatory assets associated with the securitized recovery of certain electric customer heating discounts, fuel and purchased power regulatory assets at the Ohio Companies (amortized through 2034) as well as the ENEC at MP and PE. MP and PE recover net power supply costs, including fuel costs, purchased power costs and related expenses, net of related market sales revenue through the ENEC. The ENEC rate is updated annually.

**Deferred distribution costs** - Primarily relates to the Ohio Companies’ deferral of certain expenses resulting from distribution and reliability related expenditures, including interest, and are amortized through 2036.

**Contract valuations** - Includes the changes in fair value of PN above-market NUG costs and the amortization of a PE purchase accounting adjustment which was recorded in connection with the AE merger representing the fair value of NUG purchased power contracts (amortized over the life of the contracts with various end dates from 2027 through 2036).

**Storm-related costs** - Relates to the recovery of storm costs, which vary by jurisdiction. Approximately $231 million and $232 million are currently being recovered through rates as of June 30, 2019 and December 31, 2018, respectively.

The following table provides information about the composition of net regulatory assets that do not earn a current return as of June 30, 2019 and December 31, 2018, a majority of which are currently being recovered through rates over varying periods depending on the nature of the deferral and the jurisdiction. Additionally, certain regulatory assets, totaling approximately $109 million as of June 30, 2019, are recorded based on prior precedent or anticipated recovery based on rate making premises without a specific order.

*(In millions)*

| Regulatory Assets by Source Not Earning a Current Return | June 30, 2019 | December 31, 2018 | Change |
| --- | ---: | ---: | ---: |
| Regulatory transition costs | $11 | $10 | $1 |
| Deferred transmission costs | 40 | 87 | (47) |
| Storm-related costs | 423 | 363 | 60 |
| Other | 42 | 43 | (1) |
| Regulatory Assets Not Earning a Current Return | $516 | $503 | $13 |

### CAPITAL RESOURCES AND LIQUIDITY

FirstEnergy’s business is capital intensive, requiring significant resources to fund operating expenses, construction expenditures, scheduled debt maturities and interest payments, dividend payments, and contributions to its pension plan.

On January 22, 2018, FirstEnergy announced a $2.5 billion equity issuance, which included $1.62 billion in mandatorily convertible preferred equity with an initial conversion price of $27.42 per share and $850 million of common equity issued at $28.22 per share. The shares of preferred stock participate in the dividend paid on common stock on an as-converted basis and are non-voting except in certain limited circumstances. The shares of preferred stock contain an optional conversion right, requiring mandatory conversion in July 2019, subject to certain exceptions noted below. Proceeds from the investment were used to reduce holding company debt by $1.45 billion and fund FirstEnergy’s pension plan as discussed below, with the remainder used for general corporate purposes. At the option of the preferred stockholders, 494,767 shares of preferred stock were converted into 18,044,018 shares of common stock in January 2019. As of June 30, 2019, 1,406,178 shares of preferred stock have been converted into 51,282,928 shares of common stock at the option of the preferred stockholders, resulting in 209,822 preferred shares outstanding and yet to be converted. On July 22, 2019, 28,302 shares of preferred stock automatically converted into 1,032,165 shares of common stock, and 181,520 shares of preferred stock remained unconverted as the holder reached the 4.9% cap as outlined in the terms of the preferred stock. All remaining outstanding shares of preferred stock will be automatically converted on January 22, 2020.

The equity investment strengthened FirstEnergy’s balance sheet and supports the company’s transition to a fully regulated utility company. By deleveraging the company, the investment also enables FirstEnergy to enhance its investment grade credit metrics and FirstEnergy does not currently anticipate the need to issue additional equity through at least 2021 outside of its regular stock investment and employee benefit plans.

In addition to this equity investment, FE and its distribution and transmission subsidiaries expect their existing sources of liquidity to remain sufficient to meet their respective anticipated obligations. In addition to internal sources to fund liquidity and capital requirements for 2019 and beyond, FE and its distribution and transmission subsidiaries expect to rely on external sources of funds. Short-term cash requirements not met by cash provided from operations are generally satisfied through short-term borrowings. Long-term cash needs may be met through the issuance of long-term debt by certain distribution and transmission subsidiaries to, among other things, fund capital expenditures and refinance short-term and maturing long-term debt, subject to market conditions and other factors.

On February 1, 2019, FirstEnergy made a $500 million voluntary cash contribution to the qualified pension plan. As a result of this contribution, FirstEnergy expects no required contributions through 2021.

FirstEnergy’s transmission growth program, *Energizing the Future*, provides a stable and proven investment platform, while producing important customer benefits. Through the program, $4.4 billion in capital investments were made from 2014 through 2017, and the company plans to invest up to an additional $4.8 billion in the 2018-2021 time frame, which includes a target of $1.2 billion annually through 2021. As noted above, over 80% of these capital investments are recoverable through formula rate mechanisms, reducing regulatory lag in recovering a return on investment, while offering a reasonable rate of return. These investments are expected to continue to improve the performance and condition of the transmission system while increasing automation and communication, adding capacity to the system and improving customer reliability. Beyond 2021, FirstEnergy believes there are incremental investment opportunities for its existing transmission infrastructure of over $20 billion, which are expected to strengthen grid and cyber-security and make the transmission system more reliable, robust, secure and resistant to extreme weather events, with improved operational flexibility.

In the Regulated Distribution segment, FirstEnergy remains committed to providing customer service-oriented growth opportunities by investing between $6.2 billion and $6.7 billion over 2018 to 2021. Approximately 40% of capital expenditures are recoverable through various rate mechanisms, riders and trackers. Beginning in 2019, expected investments at the Ohio Companies include the pending Ohio Grid Modernization plan which includes installation of approximately 700,000 advanced meters, distribution automation, and integrated ‘volt/var’ controls. Additionally, the JCP&L Reliability Plus infrastructure improvement plan will reduce outages and strengthen the system while preparing for the grid of the future in New Jersey. FirstEnergy continues to explore other opportunities for growth in its Regulated Distribution business, including investments in electric system improvement and modernization projects to increase reliability and improve service to customers, as well as exploring opportunities in customer engagement that focus on electrification of customers’ homes and businesses by providing a full range of products and services.

In alignment with FirstEnergy’s strategy to invest in its Regulated Transmission and Regulated Distribution segments as a fully regulated company, FirstEnergy is also focused on improving the balance sheet over time consistent with its business profile and maintaining investment grade ratings at its regulated businesses and FE. Specifically, at the regulated businesses, regulatory authority has been obtained for various regulated distribution and transmission subsidiaries to issue and/or refinance debt.

Any financing plans by FE or any of its consolidated subsidiaries, including the issuance of equity and debt, and the refinancing of short-term and maturing long-term debt are subject to market conditions and other factors. No assurance can be given that any such issuances, financing or refinancing, as the case may be, will be completed as anticipated or at all. Any delay in the completion of financing plans could require FE or any of its consolidated subsidiaries to utilize short-term borrowing capacity, which could impact available liquidity. In addition, FE and its consolidated subsidiaries expect to continually evaluate any planned financings, which may result in changes from time to time.

On March 9, 2018, FES borrowed $500 million from FE under the secured credit facility, dated as of December 6, 2016, among FES, as Borrower, FG and NG as guarantors, and FE, as lender, which fully utilized the committed line of credit available under the secured credit facility. Following deconsolidation of FES, FE fully reserved for the $500 million associated with the borrowings under the secured credit facility. Under the terms of the FES Bankruptcy settlement agreement, FE will release any and all claims against the FES Debtors with respect to the $500 million borrowed under the secured credit facility.

On September 26, 2018, the Bankruptcy Court approved a FES Bankruptcy settlement agreement dated August 26, 2018, by and among FirstEnergy, two groups of key FES creditors (collectively, the FES Key Creditor Groups), the FES Debtors and the UCC. The FES Bankruptcy settlement agreement resolves certain claims by FirstEnergy against the FES Debtors and all claims by the FES Debtors and their creditors against FirstEnergy and would result in the cash payment upon emergence, note issuance and other terms as discussed in the Executive Summary.

The FES Bankruptcy settlement agreement remains subject to satisfaction of certain conditions, most notably the issuance of a final order by the Bankruptcy Court approving the plan or plans of reorganization for the FES Debtors that are acceptable to FirstEnergy consistent with the requirements of the FES Bankruptcy settlement agreement. There can be no assurance that such conditions will be satisfied or the FES Bankruptcy settlement agreement will be otherwise consummated, and the actual outcome of this matter may differ materially from the terms of the agreement described herein. FirstEnergy will continue to evaluate the impact of any new factors on the settlement and their relative impact on the financial statements.

As of June 30, 2019, FirstEnergy’s net deficit in working capital (current assets less current liabilities) was due in large part to short-term borrowings of $1,250 million, currently payable long-term debt of $381 million, and other current liabilities of $840 million primarily attributable to interest, customer deposits and anticipated payments under the FES Bankruptcy settlement. Currently payable long-term debt as of June 30, 2019, consisted of the following:

*(In millions)*

| Currently Payable Long-Term Debt |  |
| --- | ---: |
| Unsecured notes | $250 |
| Secured notes | 50 |
| Sinking fund requirements | 64 |
| Other notes | 17 |
|  | $381 |

FirstEnergy believes its cash from operations and available liquidity will be sufficient to meet its working capital needs.

### Short-Term Borrowings / Revolving Credit Facilities

FE and the Utilities and FET and certain of its subsidiaries participate in two separate five-year syndicated revolving credit facilities providing for aggregate commitments of $3.5 billion (Facilities), which are available until December 6, 2022. Under the FE Facility, an aggregate amount of $2.5 billion is available to be borrowed, repaid and reborrowed, subject to separate borrowing sub-limits for each borrower including FE and its regulated distribution subsidiaries. Under the FET Facility, an aggregate amount of $1.0 billion is available to be borrowed, repaid and reborrowed under a syndicated credit facility, subject to separate borrowing sub-limits for each borrower including FE’s transmission subsidiaries.

Borrowings under their Facilities may be used for working capital and other general corporate purposes, including intercompany loans and advances by a borrower to any of its subsidiaries. Generally, borrowings under each of the Facilities are available to each borrower separately and mature on the earlier of 364 days from the date of borrowing or the commitment termination date, as the same may be extended. Each of the Facilities contains financial covenants requiring each borrower to maintain a consolidated debt-to-total-capitalization ratio (as defined under each of the Facilities) of no more than 65%, and 75% for FET, measured at the end of each fiscal quarter.

FirstEnergy had $1,250 million of short-term borrowings as of both June 30, 2019 and December 31, 2018. FirstEnergy’s available liquidity from external sources as of July 22, 2019, was as follows:

*(In millions)*

| Borrower(s) | Type Maturity | Commitment | Available Liquidity |
| --- | --- | ---: | ---: |
| FirstEnergy(1) | Revolving December 2022 | $2,500 | $2,491 |
| FET(2) | Revolving December 2022 | 1,000 | 1,000 |
|  | Subtotal | $3,500 | $3,491 |
|  | Cash and cash equivalents | — | 278 |
|  | Total | $3,500 | $3,769 |

(1) FE and the Utilities. Available liquidity includes impact of $9 million of LOCs issued under various terms.

(2) Includes FET and the Transmission Companies.

The following table summarizes the borrowing sub-limits for each borrower under the facilities, the limitations on short-term indebtedness applicable to each borrower under current regulatory approvals and applicable statutory and/or charter limitations as of June 30, 2019:

*(In millions)*

| Borrower | FirstEnergy Revolving Credit Facility Sub-Limit | FET Revolving Credit Facility Sub-Limit | Regulatory and Other Short-Term Debt Limitations |  |
| --- | ---: | ---: | ---: | ---: |
| FE | $2,500 | $— | $— | (1) |
| FET | — | 1,000 | — | (1) |
| OE | 500 | — | 500 | (2) |
| CEI | 500 | — | 500 | (2) |
| TE | 300 | — | 300 | (2) |
| JCP&L | 500 | — | 500 | (2) |
| ME | 500 | — | 500 | (2) |
| PN | 300 | — | 300 | (2) |
| WP | 200 | — | 200 | (2) |
| MP | 500 | — | 500 | (2) |
| PE | 150 | — | 150 | (2) |
| ATSI | — | 500 | 500 | (2) |
| Penn | 100 | — | 100 | (2) |
| TrAIL | — | 400 | 400 | (2) |
| MAIT | — | 400 | 400 | (2) |

(1) No limitations.

(2) Includes amounts which may be borrowed under the regulated companies’ money pool.

$250 million of the FE Facility and $100 million of the FET Facility, subject to each borrower’s sub-limit, is available for the issuance of LOCs (subject to borrowings drawn under the Facilities) expiring up to one year from the date of issuance. The stated amount of outstanding LOCs will count against total commitments available under each of the Facilities and against the applicable borrower’s borrowing sub-limit.

The Facilities do not contain provisions that restrict the ability to borrow or accelerate payment of outstanding advances in the event of any change in credit ratings of the borrowers. Pricing is defined in “pricing grids,” whereby the cost of funds borrowed under the Facilities is related to the credit ratings of the company borrowing the funds, Additionally, borrowings under each of the Facilities are subject to the usual and customary provisions for acceleration upon the occurrence of events of default, including a cross-default for other indebtedness in excess of $100 million.

As of June 30, 2019, the borrowers were in compliance with the applicable debt-to-total-capitalization ratio covenants in each case as defined under the respective Facilities. The minimum interest charge coverage ratio no longer applies following FE’s upgrade to an investment grade credit rating.

### Term Loans

FE participates in two separate syndicated term loan credit facilities, the first being a $1.25 billion 364-day facility with The Bank of Nova Scotia, as administrative agent, and the lenders identified therein, and the second being a $500 million two-year facility with JPMorgan Chase Bank, N.A., as administrative agent, and the lenders identified therein, respectively. The term loans contain covenants and other terms and conditions substantially similar to those of the FE revolving credit facility described above, including a consolidated debt-to-total-capitalization ratio.

The initial borrowing of $1.75 billion under the new term loans, which took the form of a Eurodollar rate advance, may be converted from time to time, in whole or in part, to alternate base rate advances or other Eurodollar rate advances. Outstanding alternate base rate advances will bear interest at a fluctuating interest rate per annum equal to the sum of an applicable margin for alternate base rate advances determined by reference to FE’s reference ratings plus the highest of (i) the administrative agent’s publicly-announced “prime rate”, (ii) the sum of 1/2 of 1% per annum plus the Federal Funds Rate in effect from time to time and (iii) the rate of interest per annum appearing on a nationally-recognized service such as the Dow Jones Market Service (Telerate) equal to one-month LIBOR on each day plus 1%. Outstanding Eurodollar rate advances will bear interest at LIBOR for interest periods of one week or one, two, three or six months plus an applicable margin determined by reference to FE’s reference ratings. Changes in FE’s reference ratings would lower or raise its applicable margin depending on whether ratings improved or were lowered, respectively.

### FirstEnergy Money Pools

FirstEnergy’s utility operating subsidiary companies also have the ability to borrow from each other and FE to meet their short-term working capital requirements. Similar but separate arrangements exist among FirstEnergy’s unregulated companies with AE Supply, FE, FET, FEV and certain other unregulated subsidiaries. FESC administers these money pools and tracks surplus funds of FE and the respective regulated and unregulated subsidiaries, as the case may be, as well as proceeds available from bank borrowings. Companies receiving a loan under the money pool agreements must repay the principal amount of the loan, together with accrued interest, within 364 days of borrowing the funds. The rate of interest is the same for each company receiving a loan from their respective pool and is based on the average cost of funds available through the pool. The average interest rate for borrowings in the first six months of 2019 was 2.54% per annum for the regulated companies’ money pool and 3.04% per annum for the unregulated companies’ money pool.

### Long-Term Debt Capacity

FE’s and its subsidiaries’ access to capital markets and costs of financing are influenced by the credit ratings of their securities. The following table displays FE’s and its subsidiaries’ credit ratings as of July 23, 2019:

| Issuer | Senior Secured S&P | Moody’s | Fitch | Senior Unsecured S&P | Moody’s | Fitch |
| --- | ---: | ---: | ---: | --- | --- | --- |
| FE | — | — | — | BBB- | Baa3 | BBB- |
| ATSI | — | — | — | BBB | A3 | BBB+ |
| CEI | A- | A3 | A- | BBB | Baa2 | BBB+ |
| FET | — | — | — | BBB- | Baa2 | BBB- |
| JCP&L | — | — | — | BBB | Baa1 | BBB+ |
| ME | — | — | — | BBB | A3 | BBB+ |
| MAIT | — | — | — | BBB | A3 | BBB+ |
| MP | A- | A3 | A- | BBB | Baa2 | — |
| OE | A- | A1 | A- | BBB | A3 | BBB+ |
| PN | — | — | — | BBB | Baa1 | BBB+ |
| Penn | — | A1 | A- | — | — | — |
| PE | — | — | A- | — | — | — |
| TE | A- | A2 | A- | — | — | — |
| TrAIL | — | — | — | BBB | A3 | BBB+ |
| WP | — | — | A- | — | — | — |

On July 23, 2019, Moody’s upgraded the issuer ratings of OE and Penn to A3 from Baa1, TE to Baa1 from Baa3, and CEI to Baa2 from Baa3. The secured ratings for OE and Penn were changed to A1 from A2, TE to A2 from Baa1, and CEI to A3 from Baa1. The rating outlook for OE remains positive, Penn was revised to positive, and TE and CEI were revised to stable.

Debt capacity is subject to the consolidated debt-to-total-capitalization limits in the credit facilities previously discussed. As of June 30, 2019, FE and its subsidiaries could issue additional debt of approximately $8.6 billion, or incur a $4.6 billion reduction to equity, and remain within the limitations of the financial covenants required by the FE Facility.

### Changes in Cash Position

As of June 30, 2019, FirstEnergy had $422 million of cash and cash equivalents and approximately $52 million of restricted cash compared to $367 million of cash and cash equivalents and approximately $62 million of restricted cash as of December 31, 2018, on the Consolidated Balance Sheets.

### Cash Flows From Operating Activities

FirstEnergy’s most significant sources of cash are derived from electric service provided by its distribution and transmission operating subsidiaries. The most significant use of cash from operating activities is buying electricity to serve non-shopping customers and paying fuel suppliers, employees, tax authorities, lenders and others for a wide range of materials and services.

FirstEnergy’s Consolidated Statement of Cash Flows combines cash flows from discontinued operations with cash flows from continuing operations within each cash flow category. The following table summarizes the major classes of cash flow items from discontinued operations for the six months ended June 30, 2019 and 2018:

*(In millions)*

| CASH FLOWS FROM OPERATING ACTIVITIES: | For the Six Months Ended June 30, 2019 | 2018 |
| --- | ---: | ---: |
| Income (loss) from discontinued operations | $(64) | $1,179 |
| Depreciation and amortization, including regulatory assets, net, intangible assets and deferred debt-related costs | — | 80 |
| Unrealized gain on derivative transactions | — | (10) |

Net cash provided from operating activities was $625 million during the first six months of 2019, compared to $288 million used for operating activities during the same period of 2018. Key changes were as follows:

- a $750 million decrease in cash contributions to the qualified pension plan;
- higher transmission revenue reflecting a higher base rate and recovery of incremental operating expenses;
- lower storm costs; partially offset by
- the absence of FES’ cash from operations from the first quarter of 2018;
- a decline in working capital primarily due to the timing of payments to vendors.

### Cash Flows From Financing Activities

In the first six months of 2019, cash provided from financing activities was $756 million, compared to $1,534 million in the same period of 2018. The following table summarizes new equity and debt financing, redemptions, repayments, make-whole premiums paid on debt redemptions, short-term borrowings and dividends:

*(In millions)*

| Securities Issued or Redeemed / Repaid New Issues | For the Six Months Ended June 30, 2019 | 2018 |
| --- | ---: | ---: |
| Unsecured notes | $1,850 | $450 |
| FMBs | 100 | — |
|  | $1,950 | $450 |
| Preferred stock issuance | $— | $1,616 |
| Common stock issuance | $— | $850 |
| Redemptions / Repayments |  |  |
| Unsecured notes | $(725) | $(555) |
| Term Loan | — | (1,450) |
| Pollution Control Revenue Bonds | — | (216) |
| Senior secured notes | (32) | (30) |
|  | $(757) | $(2,251) |
| Make-whole premiums paid on debt redemptions | $— | $(89) |
| Short-term borrowings, net | $— | $1,364 |
| Preferred stock dividend payments | $(6) | $(42) |
| Common stock dividend payments | $(403) | $(343) |

On January 10, 2019, ME issued $500 million of 4.30% senior notes due 2029. Proceeds from the issuance of senior notes were primarily used to refinance existing indebtedness, including ME’s $300 million of 7.70% senior notes due 2019, and borrowings outstanding under the FE regulated utility money pool and the FE Facility, to fund capital expenditures, and for other general corporate purposes.

On February 8, 2019, JCP&L issued $400 million of 4.30% senior notes due 2026. Proceeds from the issuance of the senior notes were primarily used to refinance existing indebtedness, including amounts under the FE regulated utility money pool incurred in connection with the repayment at maturity of JCP&L’s $300 million of 7.35% senior notes due 2019 and the funding of storm recovery and restoration costs and expenses, to fund capital expenditures and working capital requirements and for other general corporate purposes.

On March 28, 2019, FET issued $500 million of 4.55% senior notes due 2049. Proceeds from the issuance of the senior notes were used primarily to support FET’s capital structure, to repay short-term borrowings outstanding under the FE unregulated money pool, to finance capital improvements, and for other general corporate purposes, including funding working capital needs and day-to-day operations.

On April 15, 2019, ATSI issued $100 million of 4.38% senior notes due 2031. Proceeds from the issuance of the senior notes were used primarily to repay short-term borrowings, to fund capital expenditures and working capital needs, and for other general corporate purposes.

On May 9, 2019, WP agreed to sell $250 million of new 4.22% FMBs due 2059. On May 21, 2019, WP issued $100 million of 4.22% FMBs due 2059. The remaining sale is expected to settle on August 15, 2019. Proceeds from the issuance of the FMBs were or are, as the case may be, used to refinance existing indebtedness, to fund capital expenditures, and for other general corporate purposes.

On June 3, 2019, PN issued $300 million of 3.60% senior notes due 2029. Proceeds from the issuance of the senior notes were used to refinance existing indebtedness, including amounts outstanding under the FE regulated companies’ money pool incurred in connection with the repayment at maturity of PN’s $125 million of 6.63% senior notes due 2019, to fund capital expenditures, and for other general corporate purposes.

On June 5, 2019, AGC issued $50 million of 4.47% senior unsecured notes due 2029. Proceeds from the issuance of the senior notes were used to improve liquidity, re-establish the debt component within its capital structure following the recent redemption of all of its existing long-term debt, and satisfy working capital requirements and other general corporate purposes.

### Cash Flows From Investing Activities

Cash used for investing activities in the first six months of 2019 principally represented cash used for property additions. The following table summarizes investing activities for the first six months of 2019 and 2018:

*(In millions)*

| Cash Used for Investing Activities(1) Property Additions: | For the Six Months Ended June 30, 2019 | 2018 | Increase (Decrease) |
| --- | ---: | ---: | ---: |
| Regulated Distribution | $672 | $655 | $17 |
| Regulated Transmission | 531 | 574 | (43) |
| Corporate / Other | 25 | 78 | (53) |
| Proceeds from asset sales | (12) | (390) | 378 |
| Investments | 20 | 33 | (13) |
| Notes receivable from affiliated companies | — | 500 | (500) |
| Asset removal costs | 103 | 118 | (15) |
| Other | (3) | (3) | — |
|  | $1,336 | $1,565 | $(229) |

(1) See Note 3, “Discontinued Operations,” for major classes of discontinued operations for cash used for investing activities.

Cash used for investing activities for the first six months of 2019 decreased $229 million, compared to the same period of 2018, primarily due to the absence of FES’ borrowings from the committed line of credit available under the secured credit facility with FE during the first quarter of 2018, lower property additions and asset removal costs, partially offset by lower proceeds from asset sales.

The decrease in property additions was due to the following:

- a decrease of $43 million at Regulated Transmission due to timing of capital investments associated with its *Energizing the Future* investment program;
- a decrease of $53 million at Corporate/Other due to lower competitive generation related investments; partially offset by
- an increase of $17 million at Regulated Distribution due to investments in electric system improvements and modernization projects to increase reliability.

### GUARANTEES AND OTHER ASSURANCES

FirstEnergy has various financial and performance guarantees and indemnifications which are issued in the normal course of business. These contracts include performance guarantees, stand-by letters of credit, debt guarantees, surety bonds and indemnifications. FirstEnergy enters into these arrangements to facilitate commercial transactions with third parties by enhancing the value of the transaction to the third party. The maximum potential amount of future payments FirstEnergy and its subsidiaries could be required to make under these guarantees as of June 30, 2019, was approximately $1.7 billion, as summarized below:

*(In millions)*

| Guarantees and Other Assurances FE’s Guarantees on Behalf of FES and FENOC | Maximum Exposure |
| --- | ---: |
| Energy and Energy-Related Contracts(1) | $5 |
| Surety Bonds - FG(2) | 200 |
| Deferred compensation arrangements | 145 |
|  | 350 |
| **FE’s Guarantees on Behalf of its Consolidated Subsidiaries** |  |
| AE Supply asset sales(3) | 555 |
| Deferred compensation arrangements | 424 |
| Fuel related contracts and other | 20 |
|  | 999 |
| **FE’s Guarantees on Behalf of Business Ventures** |  |
| Global Holding Facility | 180 |
| **Other Assurances** |  |
| Surety Bonds | 131 |
| LOCs(4) | 9 |
|  | 140 |
| **Total Guarantees and Other Assurances** | $1,669 |

(1) Issued for open-ended terms, with a 10-day termination right by FirstEnergy.

(2) FE provides credit support for FG surety bonds for $169 million and $31 million for the benefit of the PA DEP with respect to LBR CCR impoundment closure and post-closure activities and the Hatfield’s Ferry CCR disposal site, respectively.

(3) As a condition to closing AE Supply’s sale of four natural gas generating plants in December 2017, FE provided the purchaser two limited three-year guarantees totaling $555 million of certain obligations of AE Supply and AGC. In connection with the FES Bankruptcy settlement agreement, FirstEnergy has also committed to provide additional guarantees to FG for certain retained environmental liabilities of AE Supply related to the Pleasants Power Station and the McElroy’s Run CCR disposal facility.

(4) Includes $9 million issued for various terms pursuant to LOC capacity available under FirstEnergy’s revolving credit facilities.

#### Collateral and Contingent-Related Features

Certain bilateral agreements contain provisions that require FE or its subsidiaries to post collateral. This collateral may be posted in the form of cash or credit support with thresholds contingent upon FE’s or its subsidiaries’ credit ratings from each of the major credit rating agencies. The collateral and credit support requirements vary by contract and by counterparty. The incremental collateral requirement allows for the offsetting of assets and liabilities with the same counterparty, where the contractual right of offset exists under applicable master netting agreements.

Bilateral agreements entered into by FE and its subsidiaries have margining provisions that require posting of collateral. The Utilities have posted collateral totaling $2 million.

These credit-risk-related contingent features, or the margining provisions within bilateral agreements, stipulate that if the subsidiary were to be downgraded or lose its investment grade credit rating (based on its senior unsecured debt rating), it would be required to provide additional collateral. Depending on the volume of forward contracts and future price movements, higher amounts for margining, which is the ability to secure additional collateral when needed, could be required. The following table discloses the potential additional credit rating contingent contractual collateral obligations as of June 30, 2019:

*(In millions)*

| Potential Collateral Obligations Contractual Obligations for Additional Collateral | AE Supply | Utilities and FET | FE | Total |
| --- | ---: | ---: | ---: | ---: |
| At Current Credit Rating | $1 | $— | $— | $1 |
| Upon Further Downgrade | — | 43 | — | 43 |
| Surety Bonds (Collateralized Amount)(1) | 1 | 59 | 246 | 306 |
| Total Exposure from Contractual Obligations | $2 | $102 | $246 | $350 |

(1) Surety Bonds are not tied to a credit rating. Surety Bonds’ impact assumes maximum contractual obligations (typical obligations require 30 days to cure). FE provides credit support for FG surety bonds for $169 million and $31 million for the benefit of the PA DEP with respect to LBR CCR impoundment closure and post-closure activities and the Hatfield’s Ferry CCR disposal site, respectively.

#### Other Commitments and Contingencies

FE is a guarantor under a $300 million syndicated senior secured term loan facility due March 3, 2020, under which Global Holding’s outstanding principal balance is $180 million as of June 30, 2019. In addition to FE, Signal Peak, Global Rail, Global Mining Group, LLC and Global Coal Sales Group, LLC, each being a direct or indirect subsidiary of Global Holding, continue to provide their joint and several guaranties of the obligations of Global Holding under the facility.

In connection with the facility, 69.99% of Global Holding’s direct and indirect membership interests in Signal Peak, Global Rail and their affiliates along with FEV’s and WMB Marketing Ventures, LLC’s respective 33-1/3% membership interests in Global Holding, are pledged to the lenders under the current facility as collateral.

### MARKET RISK INFORMATION

FirstEnergy uses various market risk sensitive instruments, including derivative contracts, primarily to manage the risk of price and interest rate fluctuations. FirstEnergy’s Risk Policy Committee, comprised of members of senior management, provides general oversight for risk management activities throughout the company.

#### Commodity Price Risk

FirstEnergy has limited exposure to financial risks resulting from fluctuating commodity prices, including prices for electricity, natural gas, coal and energy transmission. FirstEnergy’s Risk Management Committee is responsible for promoting the effective design and implementation of sound risk management programs and oversees compliance with corporate risk management policies and established risk management practice.

The valuation of derivative contracts is based on observable market information. As of June 30, 2019, FirstEnergy has a net liability of $33 million in non-hedge derivative contracts that are primarily related to NUG contracts at certain of the Utilities. NUG contracts are subject to regulatory accounting and do not impact earnings.

#### Equity Price Risk

As of June 30, 2019, the FirstEnergy pension plan assets were allocated approximately as follows: 37% in equity securities, 36% in fixed income securities, 10% in absolute return strategies, 8% in real estate, 2% in private equity, 5% in derivatives and 2% in cash and short-term securities. A decline in the value of pension plan assets could result in additional funding requirements. FirstEnergy’s funding policy is based on actuarial computations using the projected unit credit method. On February 1, 2019, FirstEnergy made a $500 million voluntary cash contribution to the qualified pension plan. As a result of this contribution, FirstEnergy expects no required contributions through 2021. See Note 5, “Pension and Other Postemployment Benefits,” of the Notes to Consolidated Financial Statements for additional details on FirstEnergy’s pension and OPEB plans. Through June 30, 2019, FirstEnergy’s pension plan assets have earned approximately 13.7% as compared to an annual expected return on plan assets of 7.5%.

As of June 30, 2019, FirstEnergy’s OPEB plans were invested in fixed income and equity securities. Through June 30, 2019, FirstEnergy’s OPEB plans have earned approximately 10.9% as compared to an annual expected return on plan assets of 7.5%.

NDT funds have been established to satisfy JCP&L, ME and PN’s nuclear decommissioning obligations associated with TMI-2. As of June 30, 2019, approximately 54% of the funds were invested in fixed income securities, 45% of the funds were invested in equity securities and 1% were invested in short-term investments, with limitations related to concentration and investment grade ratings. The investments are carried at their market values of approximately $475 million, $393 million and $11 million for fixed income securities, equity securities and short-term investments, respectively, as of June 30, 2019, excluding $16 million of net receivables, payables and accrued income. A hypothetical 10% decrease in prices quoted by stock exchanges would result in a $39 million reduction in fair value as of June 30, 2019. A decline in the value of JCP&L, ME and PN’s NDTs or a significant escalation in estimated decommissioning costs could result in additional funding requirements. During the six months ended June 30, 2019, JCP&L, ME and PN made no contributions to the NDTs.

#### Interest Rate Risk

FirstEnergy recognizes net actuarial gains or losses for its pension and OPEB plans in the fourth quarter of each fiscal year and whenever a plan is determined to qualify for a remeasurement. A primary factor contributing to these actuarial gains and losses are changes in the discount rates used to value pension and OPEB obligations as of the measurement date of December 31 and the difference between expected and actual returns on the plans’ assets. At this time, FirstEnergy is unable to determine or project the mark-to-market adjustment that may be recorded as of December 31, 2019.

### CREDIT RISK

Credit risk is the risk that FirstEnergy would incur a loss as a result of nonperformance by counterparties of their contractual obligations. FirstEnergy maintains credit policies and procedures with respect to counterparty credit (including requirement that counterparties maintain specified credit ratings) and require other assurances in the form of credit support or collateral in certain circumstance in order to limit counterparty credit risk. However, FirstEnergy, as applicable, has concentrations of suppliers and customers among electric utilities, financial institutions and energy marketing and trading companies. These concentrations may impact FirstEnergy’s overall exposure to credit risk, positively or negatively, as counterparties may be similarly affected by changes in economic, regulatory or other conditions. In the event an energy supplier of the Ohio Companies, Pennsylvania Companies, JCP&L or PE defaults on its obligation, the affected company would be required to seek replacement power in the market. In general, subject to regulatory review or other processes, appropriate incremental costs incurred by these entities would be recoverable from customers through applicable rate mechanisms, thereby mitigating the financial risk for these entities. FirstEnergy’s credit policies to manage credit risk include the use of an established credit approval process, daily credit mitigation provisions, such as margin, prepayment or collateral requirements. FirstEnergy and its subsidiaries may request additional credit assurance, in certain circumstances, in the event that the counterparties’ credit ratings fall below investment grade, their tangible net worth falls below specified percentages or their exposures exceed an established credit limit.

### OUTLOOK

### STATE REGULATION

Each of the Utilities’ retail rates, conditions of service, issuance of securities and other matters are subject to regulation in the states in which it operates - in Maryland by the MDPSC, in New Jersey by the NJBPU, in Ohio by the PUCO, in Pennsylvania by the PPUC, in West Virginia by the WVPSC and in New York by the NYPSC. The transmission operations of PE in Virginia are subject to certain regulations of the VSCC. In addition, under Ohio law, municipalities may regulate rates of a public utility, subject to appeal to the PUCO if not acceptable to the utility. Further, if any of the FirstEnergy affiliates were to engage in the construction of significant new transmission facilities, depending on the state, they may be required to obtain state regulatory authorization to site, construct and operate the new transmission facility.

#### MARYLAND

PE operates under MDPSC approved base rates that were effective as of March 23, 2019. PE also provides SOS pursuant to a combination of settlement agreements, MDPSC orders and regulations, and statutory provisions. SOS supply is competitively procured in the form of rolling contracts of varying lengths through periodic auctions that are overseen by the MDPSC and a third-party monitor. Although settlements with respect to SOS supply for PE customers have expired, service continues in the same manner until changed by order of the MDPSC. PE recovers its costs plus a return for providing SOS.

The EmPOWER Maryland program requires each electric utility to file a plan to reduce electric consumption and demand 0.2% per year, up to the ultimate goal of 2% annual savings, for the duration of the 2018-2020 and 2021-2023 EmPOWER Maryland program cycles, to the extent the MDPSC determines that cost-effective programs and services are available. PE’s 2016 starting goal under this requirement was 0.97%. PE’s approved 2018-2020 EmPOWER Maryland plan continues and expands upon prior years’ programs, and adds new programs, for a projected total cost of $116 million over the three-year period. PE recovers program costs subject to a five-year amortization. Maryland law only allows for the utility to recover lost distribution revenue attributable to energy efficiency or demand reduction programs through a base rate case proceeding, and to date, such recovery has not been sought or obtained by PE.

On January 19, 2018, PE filed a joint petition along with other utility companies, work group stakeholders and the MDPSC electric vehicle work group leader to implement a statewide electric vehicle portfolio in connection with a 2016 MDPSC proceeding to consider an array of issues relating to electric distribution system design, including matters relating to electric vehicles, distributed energy resources, advanced metering infrastructure, energy storage, system planning, rate design, and impacts on low-income customers. PE proposed an electric vehicle charging infrastructure program at a projected total cost of $12 million, to be recovered over a five-year amortization. On January 14, 2019, the MDPSC approved the petition subject to certain reductions in the scope of the program. The MDPSC approved PE’s compliance filing, which implements the pilot program, with minor modifications, on July 3, 2019.

On August 24, 2018, PE filed a base rate case with the MDPSC, which it supplemented on October 22, 2018, to update the partially forecasted test year with a full twelve months of actual data. The rate case requested an annual increase in base distribution rates of $19.7 million, plus creation of an EDIS to fund four enhanced service reliability programs. In responding to discovery, PE revised its request for an annual increase in base rates to $17.6 million. The proposed rate increase reflected $7.3 million in annual savings for customers resulting from the recent federal tax law changes. On March 22, 2019, the MDPSC issued a final order that approved a rate increase of $6.2 million, approved three of the four EDIS programs for four years, directed PE to file a new depreciation study within 18 months, and ordered the filing of a new base rate case in four years to correspond to the ending of the approved EDIS programs.

#### NEW JERSEY

JCP&L operates under NJBPU approved rates that were effective as of January 1, 2017. JCP&L provides BGS for retail customers who do not choose a third-party EGS and for customers of third-party EGSs that fail to provide the contracted service. All New Jersey EDCs participate in this competitive BGS procurement process and recover BGS costs directly from customers as a charge separate from base rates.

On April 18, 2019, pursuant to the May 2018 New Jersey enacted legislation establishing a ZEC program to provide ratepayer funded subsidies of New Jersey nuclear energy supply, the NJBPU approved the implementation of a non-bypassable, irrevocable ZEC charge for all New Jersey electric utility customers, including JCP&L’s customers. Once collected from customers by JCP&L, these funds will be remitted to eligible nuclear energy generators.

In December 2017, the NJBPU issued proposed rules to modify its current CTA policy in base rate cases to: (i) calculate savings using a five-year look back from the beginning of the test year; (ii) allocate savings with 75% retained by the company and 25% allocated to ratepayers; and (iii) exclude transmission assets of electric distribution companies in the savings calculation, which were published in the NJ Register in the first quarter of 2018. JCP&L filed comments supporting the proposed rulemaking. On January 17, 2019, the NJBPU approved the proposed CTA rules with no changes. On May 17, 2019, the Rate Counsel filed an appeal with the Appellate Division of the Superior Court of New Jersey.

Also in December 2017, the NJBPU approved its IIP rulemaking. The IIP creates a financial incentive for utilities to accelerate the level of investment needed to promote the timely rehabilitation and replacement of certain non-revenue producing components that enhance reliability, resiliency, and/or safety. On July 13, 2018, JCP&L filed an infrastructure plan, JCP&L Reliability Plus, which proposed to accelerate $386.8 million of electric distribution infrastructure investment over four years to enhance the reliability and resiliency of its distribution system and reduce the frequency and duration of power outages. On January 23, 2019, the NJBPU granted JCP&L’s request to temporarily suspend the procedural schedule in the matter pending settlement discussions. On April 23, 2019, JCP&L filed a Stipulation of Settlement with the NJBPU on behalf of the JCP&L, Rate Counsel, NJBPU Staff and New Jersey Large Energy Users Coalition, which provides that JCP&L will invest up to approximately $97 million in capital investments beginning on June 1, 2019 through December 31, 2020. JCP&L shall seek recovery of the capital investment through an accelerated cost recovery mechanism, provided for in the rules, that includes a revenue adjustment calculation and a process for two rate adjustments. On May 8, 2019, the NJBPU issued an order approving the Stipulation of Settlement without modifications.

On January 31, 2018, the NJBPU instituted a proceeding to examine the impacts of the Tax Act on the rates and charges of New Jersey utilities. The NJBPU ordered New Jersey utilities to: (1) defer on their books the impacts of the Tax Act effective January 1, 2018; (2) to file tariffs effective April 1, 2018, reflecting the rate impacts of changes in current taxes; and (3) to file tariffs effective July 1, 2018, reflecting the rate impacts of changes in deferred taxes. On March 2, 2018, JCP&L filed a petition with the NJBPU, which included proposed tariffs for a base rate reduction of $28.6 million effective April 1, 2018, and a rider to reflect $1.3 million in rate impacts of changes in deferred taxes. On March 26, 2018, the NJBPU approved JCP&L’s rate reduction effective April 1, 2018, on an interim basis subject to refund, pending the outcome of this proceeding. On April 23, 2019, JCP&L filed a Stipulation of Settlement on behalf of the Rate Counsel, NJBPU Staff, and the New Jersey Large Energy Users Coalition with the NJBPU. The terms of the Stipulation of Settlement provide that between January 1, 2018 and March 31, 2018, JCP&L’s refund obligation is estimated to be approximately $7 million, which will be refunded to customers. The Stipulation of Settlement also provides for a base rate reduction of $28.6 million, which was reflected in rates on April 1, 2018, and a Rider Tax Act Adjustment for certain items over a five-year period. On May 8, 2019, the NJBPU issued an order approving the Stipulation of Settlement without modification.

#### OHIO

The Ohio Companies currently operate under ESP IV through May 31, 2024. ESP IV includes Rider DMR, which provides for the Ohio Companies to collect $132.5 million annually for three years beginning in 2017, with the possibility of a two-year extension and is grossed up for federal income taxes, resulting in an approved amount of approximately $168 million annually in 2018 and

2019\. Revenues from Rider DMR will be excluded from the significantly excessive earnings test for the initial three-year term but the exclusion will be reconsidered upon application for a potential two-year extension. The PUCO set three conditions for continued recovery under Rider DMR: (1) retention of the corporate headquarters and nexus of operations in Akron, Ohio; (2) no change in control of the Ohio Companies; and (3) a demonstration of sufficient progress in the implementation of grid modernization programs approved by the PUCO. ESP IV also continues a base distribution rate freeze through May 31, 2024. In addition, ESP IV continues the supply of power to non-shopping customers at a market-based price set through an auction process. On February 1, 2019, the Ohio Companies filed with the PUCO an application requesting a two-year extension of Rider DMR at the same amount and conditions.

ESP IV also continues Rider DCR, which supports continued investment related to the distribution system for the benefit of customers, with increased revenue caps of $30 million per year through May 31, 2019; $20 million per year from June 1, 2019 through May 31, 2022; and $15 million per year from June 1, 2022 through May 31, 2024. ESP IV also includes: (1) the collection of lost distribution revenues associated with energy efficiency and peak demand reduction programs; (2) an agreement to file a Grid Modernization Business Plan for PUCO consideration and approval, which was filed in February 2016, and remains pending as part of the grid modernization settlement described below; (3) a goal across FirstEnergy to reduce CO2 emissions by 90% below 2005 levels by 2045; (4) contributions, totaling $51 million to: (a) fund energy conservation programs, economic development and job retention in the Ohio Companies’ service territories; (b) establish a fuel-fund in each of the Ohio Companies’ service territories to assist low-income customers; and (c) establish a Customer Advisory Council to ensure preservation and growth of the competitive market in Ohio; and (5) an agreement to file an application to transition to a straight fixed variable cost recovery mechanism for residential customers’ base distribution rates, which filing the PUCO denied on June 13, 2018.

Several parties, including the Ohio Companies, filed applications for rehearing regarding the Ohio Companies’ ESP IV with the PUCO. On August 16, 2017, the PUCO denied all remaining intervenor applications for rehearing, denied the Ohio Companies’ challenges to the modifications to Rider DMR and added a third-party monitor to ensure that Rider DMR funds are spent appropriately. The Ohio Companies then filed an application for rehearing of the PUCO’s August 16, 2017 ruling on the issues of the third-party monitor and the ROE calculation for advanced metering infrastructure, which the PUCO denied. In October 2017, the Sierra Club and the OMAEG filed notices of appeal with the SCOH appealing various PUCO entries on their applications for rehearing. The Ohio Companies intervened in the appeal, and additional parties subsequently filed notices of appeal with the SCOH challenging various PUCO entries on their applications for rehearing. On September 26, 2018, the SCOH denied a July 30, 2018 joint motion filed by the OCC, the NOAC, and the OMAEG to stay the portions of the PUCO’s orders and entries under appeal that authorized Rider DMR. On June 19, 2019, the SCOH reversed the PUCO’s determination that Rider DMR is lawful, and remanded the matter to the PUCO with instructions to remove Rider DMR from ESP IV. On July 1, 2019, the Ohio Companies filed a motion with the SCOH requesting reconsideration of the SCOH decision. Also, on July 1, 2019, the Ohio Companies filed revised tariffs with the PUCO providing that while the motion for reconsideration is pending, Rider DMR is being collected subject to refund. On July 2, 2019, the PUCO approved the Ohio Companies’ revised tariffs. On July 11, 2019, various parties filed a memorandum with the SCOH in opposition to the motion for reconsideration.

Under Ohio law, the Ohio Companies are required to implement energy efficiency programs that achieve certain annual energy savings and total peak demand reductions. The Ohio Companies’ 2017-2019 plan, as proposed in April 2016, includes a portfolio of energy efficiency programs targeted to a variety of customer segments, including residential customers, low income customers, small commercial customers, large commercial and industrial customers and governmental entities. In December 2016, the Ohio Companies filed a Stipulation and Recommendation with several parties that contained changes to the plan and a decrease in the plan costs. The Ohio Companies anticipate the cost of the plans will be approximately $268 million over the life of the portfolio plans and such costs are expected to be recovered through the Ohio Companies’ existing rate mechanisms. On November 21, 2017, the PUCO issued an order that approved the proposed plans with several modifications, including a cap on the Ohio Companies’ collection of program costs and shared savings set at 4% of the Ohio Companies’ total sales to customers. On December 21, 2017, the Ohio Companies filed an application for rehearing challenging the PUCO’s modifications, which the PUCO denied on January 10, 2018. On March 12, 2018, the Ohio Companies appealed to the SCOH challenging the PUCO’s imposition of a 4% cost cap. Various other parties also appealed challenging various PUCO entries on their applications for rehearing. Oral argument on the appeals was held on February 20, 2019.

On July 23, 2019, Ohio enacted legislation establishing support for nuclear energy supply in Ohio. In addition to the provisions supporting nuclear energy, the legislation included a provision implementing a decoupling mechanism for Ohio electric utilities. The legislation also is ending current energy efficiency program mandates on December 31, 2020, provided statewide energy efficiency mandates are achieved as determined by the PUCO. Should the Ohio Companies elect to apply to the PUCO for approval of the decoupling mechanism, it would set residential and commercial base distribution related revenues at the levels collected in 2018. As such, those base distribution revenues would no longer be based on electric consumption, which allows continued support of energy efficiency initiatives while also providing revenue certainty to the Ohio Companies. FirstEnergy is reviewing the potential impacts to customers and the Ohio Companies, and may seek approval for this mechanism later this year.

On December 1, 2017, the Ohio Companies filed an application with the PUCO for approval of a DPM Plan. The DPM Plan is a portfolio of approximately $450 million in distribution platform investment projects, which are designed to modernize the Ohio Companies’ distribution grid, prepare it for further grid modernization projects, and provide customers with immediate reliability benefits. On November 9, 2018, the Ohio Companies filed a settlement agreement that provides for the implementation of the first phase of grid modernization plans, including the investment of $516 million over three years to modernize the Ohio Companies’ electric distribution system, and for all tax savings associated with the Tax Act, discussed below, to flow back to customers. On January 25, 2019, the Ohio Companies filed a supplemental settlement agreement that keeps intact the provisions of the settlement described above and adds further customer benefits and protections, which broadened support for the settlement. The settlement has broad support, including PUCO Staff, the OCC, representatives of industrial and commercial customers, a low-income advocate, environmental advocates, hospitals, competitive generation suppliers and other parties. On July 17, 2019, the PUCO approved the settlement agreement with no material modifications.

On January 10, 2018, the PUCO opened a case to consider the impacts of the Tax Act and determine the appropriate course of action to pass benefits on to customers. The Ohio Companies, effective January 1, 2018, were required to establish a regulatory liability for the estimated reduction in federal income tax resulting from the Tax Act, and filed comments on February 15, 2018, explaining that customers will save nearly $40 million annually as a result of updating tariff riders for the tax rate changes and that the Ohio Companies’ base distribution rates are not impacted by the Tax Act changes because they are frozen through May 2024. On October 24, 2018, the PUCO entered an Order in its investigation into the impacts of the Tax Act on Ohio’s utilities directing that by January 1, 2019, all Ohio rate-regulated utility companies, unless ordered otherwise, file applications not for an increase in rates to reflect the impact of the Tax Act on each specific utility’s current rates. On October 30, 2018, the Ohio Companies filed an application to open a new proceeding for the implementation of matters relating to the impact of the Tax Act. As discussed further above, on November 9, 2018, the Ohio Companies filed a settlement agreement that provides for all tax savings associated with the Tax Act to flow back to customers and for the implementation of the first phase of grid modernization plans. As part of the agreement, the Ohio Companies also filed an application for approval of a rider to return the remaining tax savings to customers following PUCO approval of the settlement. On December 19, 2018, the PUCO upheld its January 10, 2018 ruling that utilities should be required to establish a deferred tax liability, effective January 1, 2018, in response to the Tax Act. On January 25, 2019, the Ohio Companies filed a supplemental settlement agreement that keeps intact the provisions of the settlement described above and adds further customer benefits and protections, which broadened support for the settlement. The PUCO conducted a hearing on February 5 and 6, 2019. On July 17, 2019, the PUCO approved the settlement agreement with no material modifications.

The Ohio Companies’ Rider NMB is designed to recover non-market-based transmission-related costs imposed on or charged to the Ohio Companies by FERC or PJM. On December 14, 2018, the Ohio Companies filed an application for a review of their 2019 Rider NMB, including recovery of future Legacy RTEP costs and previously absorbed Legacy RTEP costs, net of refunds received from PJM. On February 27, 2018, the PUCO issued an order directing the Ohio Companies to file revised final tariffs recovering Legacy RTEP costs incurred since May 31, 2018, but excluding recovery of approximately $95 million in Legacy RTEP costs incurred prior to May 31, 2018, net of refunds received from PJM. The PUCO solicited comments on whether the Ohio Companies should be permitted to recover the Legacy RTEP charges incurred prior to May 31, 2018. The Ohio Companies, OCC and OMAEG filed comments on March 29, 2019. The Ohio Companies filed reply comments on April 15, 2019.

On April 19, 2019, OCC filed an application for rehearing alleging Rider DMR revenues should not have been excluded from the determination of the existence of Significantly Excessive Earnings under ESP IV for calendar year 2017 and claiming a $42 million refund is due to OE customers. On May 15, 2019, the PUCO denied OCC’s application for rehearing, and on July 15, 2019, OCC filed a Notice of Appeal with the SCOH. The Ohio Companies intend to contest this appeal but are unable to predict the outcome of this matter.

#### PENNSYLVANIA

The Pennsylvania Companies operate under rates approved by the PPUC, effective as of January 27, 2017. These rates were adjusted for the net impact of the Tax Act, effective March 15, 2018. The net impact of the Tax Act for the period January 1, 2018 through March 14, 2018 must also be separately tracked for treatment in a future rate proceeding. The Pennsylvania Companies operate under DSPs for the June 1, 2019 through May 31, 2023 delivery period, which provide for the competitive procurement of generation supply for customers who do not choose an alternative EGS or for customers of alternative EGSs that fail to provide the contracted service.

Under the 2019-2023 DSPs, supply will be provided by wholesale suppliers through a mix of 3, 12 and 24-month energy contracts, as well as two RFPs for 2-year SREC contracts for ME, PN and Penn. The 2019-2023 DSPs also include modifications to the Pennsylvania Companies’ POR programs in order to continue their clawback pilot program as a long-term, permanent program term, and modifications to the Pennsylvania Companies’ customer class definitions to allow for the introduction of hourly priced default service to customers at or above 100kW. The PPUC directed a working group to further discuss the implementation of customer assistance program shopping limitations and appropriate scripting for the Pennsylvania Companies’ customer referral programs, and in November 2018, issued a subsequent order to approve additional customer assistance program shopping parameters and further limit the scope of the working group discussion. On December 21, 2018, the PPUC issued a tentative order proposing a model to incorporate the directed shopping restrictions. Comments on the proposal were filed January 22, 2019. On February 28, 2019, the PPUC issued a final order approving the Pennsylvania Companies’ proposal on customer assistance programs shopping limitations and directing script modifications to the Pennsylvania Companies’ customer referral programs.

Pursuant to Pennsylvania Act 129 of 2008 and PPUC orders, Pennsylvania EDCs implement energy efficiency and peak demand reduction programs. The Pennsylvania Companies’ Phase III EE&C plans for the June 2016 through May 2021 period, which were approved in March 2016, with expected costs up to $390 million, are designed to achieve the targets established in the PPUC’s Phase III Final Implementation Order with full recovery through the reconcilable EE&C riders.

Pennsylvania EDCs may establish a DSIC to recover costs of infrastructure improvements and costs related to highway relocation projects with PPUC approval. LTIIPs outlining infrastructure improvement plans for PPUC review and approval must be filed prior to approval of a DSIC. On June 14, 2017, the PPUC approved modified LTIIPs for ME, PN and Penn for the remaining years of 2017 through 2020 to provide additional support for reliability and infrastructure investments. On September 20, 2018, following a periodic review of the LTIIPs as required by regulation once every five years, the PPUC entered an Order concluding that the Pennsylvania Companies have substantially adhered to the schedules and expenditures outlined in their LTIIPs, but that changes to the LTIIPs as designed are necessary to maintain and improve reliability and directed the Pennsylvania Companies to file modified or new LTIIPs. On January 18, 2019, the Pennsylvania Companies filed modifications to their current LTIIPs that would terminate those LTIIPs at the end of 2019, and proposed revised LTIIP spending in 2019 of approximately $45 million by ME, $25 million by PN, $26 million by Penn and $51 million by WP. The Pennsylvania Companies also committed to making filings later in 2019, which would propose new LTIIPs for the 2020 through 2024 period. On May 23, 2019, the PPUC issued an order approving the Pennsylvania Companies’ Modified LTIIPs as filed.

The Pennsylvania Companies’ approved DSIC riders for quarterly cost recovery went into effect July 1, 2016, subject to hearings and refund or reallocation among customer classes. In the January 19, 2017 order approving the Pennsylvania Companies’ general rate cases, the PPUC added an additional issue to the DSIC proceeding to include whether ADIT should be included in DSIC calculations. On February 2, 2017, the parties to the DSIC proceeding submitted a Joint Settlement to the ALJ that resolved the issues that were pending from the order issued on June 9, 2016. On April 19, 2018, the PPUC approved the Joint Settlement without modification and reversed the ALJ’s previous decision that would have required the Pennsylvania Companies to reflect all federal and state income tax deductions related to DSIC-eligible property in currently effective DSIC rates. On May 21, 2018, the Pennsylvania OCA filed an appeal with the Pennsylvania Commonwealth Court of the PPUC’s decision of April 19, 2018. On June 11, 2018, the Pennsylvania Companies filed a Notice of Intervention in the Pennsylvania OCA’s appeal to the Commonwealth Court. On July 11, 2019, the Commonwealth Court issued an opinion and order reversing the PPUC’s decision of April 19, 2018, and remanding the matter to the PPUC to require the Pennsylvania Companies to revise their tariffs and DSIC calculations to include ADIT and state income taxes. The Pennsylvania Companies are reviewing the Commonwealth Court’s opinion and order.

#### WEST VIRGINIA

MP and PE provide electric service to all customers through traditional cost-based, regulated utility ratemaking and operates under rates approved by the WVPSC effective February 2015. MP and PE recover net power supply costs, including fuel costs, purchased power costs and related expenses, net of related market sales revenue through the ENEC. MP’s and PE’s ENEC rate is updated annually.

### FERC REGULATORY MATTERS

Under the FPA, FERC regulates rates for interstate wholesale sales, transmission of electric power, accounting and other matters, including construction and operation of hydroelectric projects. With respect to their wholesale services and rates, the Utilities, AE Supply, AGC, and the Transmission Companies are subject to regulation by FERC. FERC regulations require JCP&L, MP, PE, WP and the Transmission Companies to provide open access transmission service at FERC-approved rates, terms and conditions. Transmission facilities of JCP&L, MP, PE, WP and the Transmission Companies are subject to functional control by PJM and transmission service using their transmission facilities is provided by PJM under the PJM Tariff.

FERC regulates the sale of power for resale in interstate commerce in part by granting authority to public utilities to sell wholesale power at market-based rates upon showing that the seller cannot exert market power in generation or transmission or erect barriers to entry into markets. The Utilities and AE Supply each have been authorized by FERC to sell wholesale power in interstate commerce at market-based rates and have a market-based rate tariff on file with FERC, although major wholesale purchases remain subject to regulation by the relevant state commissions.

Federally-enforceable mandatory reliability standards apply to the bulk electric system and impose certain operating, record-keeping and reporting requirements on the Utilities, AE Supply, and the Transmission Companies. NERC is the ERO designated by FERC to establish and enforce these reliability standards, although NERC has delegated day-to-day implementation and enforcement of these reliability standards to eight regional entities, including RFC. All of the facilities that FirstEnergy operates are located within the RFC region. FirstEnergy actively participates in the NERC and RFC stakeholder processes, and otherwise monitors and manages its companies in response to the ongoing development, implementation and enforcement of the reliability standards implemented and enforced by RFC.

FirstEnergy believes that it is in material compliance with all currently effective and enforceable reliability standards. Nevertheless, in the course of operating its extensive electric utility systems and facilities, FirstEnergy occasionally learns of isolated facts or circumstances that could be interpreted as excursions from the reliability standards. If and when such occurrences are found, FirstEnergy develops information about the occurrence and develops a remedial response to the specific circumstances, including in appropriate cases “self-reporting” an occurrence to RFC. Moreover, it is clear that NERC, RFC and FERC will continue to refine existing reliability standards as well as to develop and adopt new reliability standards. Any inability on FirstEnergy’s part to comply with the reliability standards for its bulk electric system could result in the imposition of financial penalties, or obligations to upgrade or build transmission facilities that could have a material adverse effect on its financial condition, results of operations and cash flows.

#### RTO Realignment

On June 1, 2011, ATSI and the ATSI zone transferred from MISO to PJM. While many of the matters involved with the move have been resolved, FERC denied recovery under ATSI’s transmission rate for certain charges that collectively can be described as “exit fees” and certain other transmission cost allocation charges totaling approximately $78.8 million until such time as ATSI submits a cost/benefit analysis demonstrating net benefits to customers from the transfer to PJM. Subsequently, FERC rejected a proposed settlement agreement to resolve the exit fee and transmission cost allocation issues, stating that its action is without prejudice to ATSI submitting a cost/benefit analysis demonstrating that the benefits of the RTO realignment decisions outweigh the exit fee and transmission cost allocation charges. In a subsequent order, FERC affirmed its prior ruling that ATSI must submit the cost/benefit analysis. ATSI is evaluating the cost/benefit approach.

#### FERC Actions on Tax Act

On March 15, 2018, FERC issued a NOI seeking information regarding whether and how FERC should address possible changes to ADIT and bonus depreciation as a result of the Tax Act. Such possible changes could impact FERC-jurisdictional rates, including transmission rates. On November 15, 2018, FERC issued a NOPR suggesting mechanisms to revise transmission rates to address the Tax Act’s effect on ADIT. Specifically, FERC proposed utilities with transmission formula rates would include mechanisms to (i) deduct any excess ADIT from or add any deficient ADIT to their rate bases; (ii) raise or lower their income tax allowances by any amortized excess or deficient ADIT; and (iii) incorporate a new permanent worksheet into their rates that will annually track information related to excess or deficient ADIT. Utilities with transmission stated rates would determine the amount of excess and deferred income tax caused by the reduced federal corporate income tax rate and return or recover this amount to or from customers. To assist with implementation of the proposed rule, FERC also issued on November 15, 2018, a policy statement providing accounting and ratemaking guidance for treatment of ADIT for all FERC-jurisdictional public utilities. The policy statement also addresses the accounting and ratemaking treatment of ADIT following the sale or retirement of an asset after December 31, 2017. FESC, on behalf of its affiliated transmission owners, supported comments submitted by EEI requesting additional clarification on the ratemaking and accounting treatment for ADIT in formula and stated transmission rates. FERC’s final rule remains pending.

#### Transmission ROE Methodology

In June 2014, FERC issued Opinion No. 531 revising its approach for calculating the discounted cash flow element of FERC’s ROE methodology and announcing the potential for a qualitative adjustment to the ROE methodology results. Parties appealed to the D.C. Circuit, and on April 14, 2017, that court issued a decision vacating FERC’s order and remanding the matter to FERC for further review. On October 16, 2018, FERC issued its order on remand, in which it proposed a revised ROE methodology. Specifically, in complaint proceedings alleging that an existing ROE is not just and reasonable, FERC proposes to rely on three financial models-discounted cash flow, capital-asset pricing, and expected earnings to establish a composite zone of reasonableness to identify a range of just and reasonable ROEs. FERC then will utilize the transmission utility’s risk relative to other utilities within that zone of reasonableness to assign the transmission utility to one of three quartiles within the zone. FERC would take no further action (i.e., dismiss the complaint) if the existing ROE falls within the identified quartile. However, if the ROE falls outside the quartile, FERC would deem the existing ROE presumptively unjust and unreasonable and would determine the replacement ROE. FERC would add a fourth financial model risk premium to the analysis to calculate a ROE based on the average point of central tendency for each of the four financial models. On March 21, 2019, FERC established NOIs to collect industry and stakeholder comments on the revised ROE methodology that is described in the October 16, 2018 decision, and also whether to make changes to FERC’s existing policies and practices for awarding transmission rates incentives. Any changes to FERC’s transmission rate ROE and incentive policies would be applied on a prospective basis. FirstEnergy currently is participating through various trade groups in the NOI comments, and any subsequent rulemaking and other proceedings.

### ENVIRONMENTAL MATTERS

Various federal, state and local authorities regulate FirstEnergy with regard to air and water quality, hazardous and solid waste disposal, and other environmental matters. While FirstEnergy’s environmental policies and procedures are designed to achieve compliance with applicable environmental laws and regulations, such laws and regulations are subject to periodic review and potential revision by the implementing agencies. FirstEnergy cannot predict the timing or ultimate outcome of any of these reviews or how any future actions taken as a result thereof may materially impact its business, results of operations, cash flows and financial condition.

#### Clean Air Act

FirstEnergy complies with SO2 and NOx emission reduction requirements under the CAA and SIP(s) by burning lower-sulfur fuel, utilizing combustion controls and post-combustion controls and/or using emission allowances.

CSAPR requires reductions of NOx and SO2 emissions in two phases (2015 and 2017), ultimately capping SO2 emissions in affected states to 2.4 million tons annually and NOx emissions to 1.2 million tons annually. CSAPR allows trading of NOx and SO2 emission allowances between power plants located in the same state and interstate trading of NOx and SO2 emission allowances with some restrictions. The D.C. Circuit ordered the EPA on July 28, 2015, to reconsider the CSAPR caps on NOx and SO2 emissions from power plants in 13 states, including Ohio, Pennsylvania and West Virginia. This follows the 2014 U.S. Supreme Court ruling generally upholding the EPA’s regulatory approach under CSAPR, but questioning whether the EPA required upwind states to reduce emissions by more than their contribution to air pollution in downwind states. The EPA issued a CSAPR update rule on September 7, 2016, reducing summertime NOx emissions from power plants in 22 states in the eastern U.S., including Ohio, Pennsylvania and West Virginia, beginning in 2017. Various states and other stakeholders appealed the CSAPR update rule to the D.C. Circuit in November and December 2016. On September 6, 2017, the D.C. Circuit rejected the industry’s bid for a lengthy pause in the litigation and set a briefing schedule. Depending on the outcome of the appeals, the EPA’s reconsideration of the CSAPR update rule and how the EPA and the states ultimately implement CSAPR, the future cost of compliance may materially impact FirstEnergy’s operations, cash flows and financial condition.

In February 2019, the EPA announced its final decision to retain without changes the NAAQS for SO2, specifically retaining the 2010 primary (health-based) 1-hour standard of 75 PPB. As of June 30, 2019, FirstEnergy has no power plants operating in areas designated as non-attainment by the EPA.

In August 2016, the State of Delaware filed a CAA Section 126 petition with the EPA alleging that the Harrison generating facility’s NOx emissions significantly contribute to Delaware’s inability to attain the ozone NAAQS. The petition sought a short-term NOx emission rate limit of 0.125 lb/mmBTU over an averaging period of no more than 24 hours. In November 2016, the State of Maryland filed a CAA Section 126 petition with the EPA alleging that NOx emissions from 36 EGUs, including Harrison Units 1, 2 and 3 and Pleasants Units 1 and 2, significantly contribute to Maryland’s inability to attain the ozone NAAQS. The petition sought NOx emission rate limits for the 36 EGUs by May 1, 2017. On September 14, 2018, the EPA denied both the States of Delaware and Maryland’s petitions under CAA Section 126. In October 2018, Delaware and Maryland appealed the denials of their petitions to the D.C. Circuit. In March 2018, the State of New York filed a CAA Section 126 petition with the EPA alleging that NOx emissions from 9 states (including Ohio, Pennsylvania and West Virginia) significantly contribute to New York’s inability to attain the ozone NAAQS. The petition seeks suitable emission rate limits for large stationary sources that are affecting New York’s air quality within the three years allowed by CAA Section 126. On May 3, 2018, the EPA extended the time frame for acting on the CAA Section 126 petition by six months to November 9, 2018 but has not taken any further action. FirstEnergy is unable to predict the outcome of these matters or estimate the loss or range of loss.

#### Climate Change

There are a number of initiatives to reduce GHG emissions at the state, federal and international level. Certain northeastern states are participating in the RGGI and western states led by California, have implemented programs, primarily cap and trade mechanisms, to control emissions of certain GHGs. Additional policies reducing GHG emissions, such as demand reduction programs, renewable portfolio standards and renewable subsidies have been implemented across the nation.

At the international level, the United Nations Framework Convention on Climate Change resulted in the Kyoto Protocol requiring participating countries, which does not include the U.S., to reduce GHGs commencing in 2008 and has been extended through 2020. The Obama Administration submitted in March 2015, a formal pledge for the U.S. to reduce its economy-wide GHG emissions by 26 to 28 percent below 2005 levels by 2025. In 2015, FirstEnergy set a goal of reducing company-wide CO2 emissions by at least 90 percent below 2005 levels by 2045. As of December 31, 2018, FirstEnergy has reduced its CO2 emissions by approximately 62 percent. In September 2016, the U.S. joined in adopting the agreement reached on December 12, 2015, at the United Nations Framework Convention on Climate Change meetings in Paris. The Paris Agreement’s non-binding obligations to limit global warming to below two degrees Celsius became effective on November 4, 2016. On June 1, 2017, the Trump Administration announced that the U.S. would cease all participation in the Paris Agreement. FirstEnergy cannot currently estimate the financial impact of climate change policies, although potential legislative or regulatory programs restricting CO2 emissions, or litigation alleging damages from GHG emissions, could require material capital and other expenditures or result in changes to its operations.

In December 2009, the EPA released its final “Endangerment and Cause or Contribute Findings for Greenhouse Gases under the Clean Air Act” concluding that concentrations of several key GHGs constitutes an “endangerment” and may be regulated as “air pollutants” under the CAA and mandated measurement and reporting of GHG emissions from certain sources, including electric generating plants. The EPA released its final CPP regulations in August 2015 to reduce CO2 emissions from existing fossil fuel-fired EGUs and finalized separate regulations imposing CO2 emission limits for new, modified, and reconstructed fossil fuel fired EGUs. Numerous states and private parties filed appeals and motions to stay the CPP with the D.C. Circuit in October 2015. On February 9, 2016, the U.S. Supreme Court stayed the rule during the pendency of the challenges to the D.C. Circuit and U.S. Supreme Court. On March 28, 2017, an executive order, entitled “Promoting Energy Independence and Economic Growth,” instructed the EPA to review the CPP and related rules addressing GHG emissions and suspend, revise or rescind the rules if appropriate. On October 16, 2017, the EPA issued a proposed rule to repeal the CPP. To replace the CPP, the EPA proposed the ACE rule on August 21, 2018, which would establish emission guidelines for states to develop plans to address GHG emissions from existing coal-fired power plants. Depending on the outcomes of the review pursuant to the executive order, of further appeals and how any final rules are ultimately implemented, the future cost of compliance may be material.

#### Clean Water Act

Various water quality regulations, the majority of which are the result of the federal CWA and its amendments, apply to FirstEnergy’s facilities. In addition, the states in which FirstEnergy operates have water quality standards applicable to FirstEnergy’s operations.

The EPA finalized CWA Section 316(b) regulations in May 2014, requiring cooling water intake structures with an intake velocity greater than 0.5 feet per second to reduce fish impingement when aquatic organisms are pinned against screens or other parts of a cooling water intake system to a 12% annual average and requiring cooling water intake structures exceeding 125 million gallons per day to conduct studies to determine site-specific controls, if any, to reduce entrainment, which occurs when aquatic life is drawn into a facility’s cooling water system. Depending on any final action taken by the states with respect to impingement and entrainment, the future capital costs of compliance with these standards may be material.

On September 30, 2015, the EPA finalized new, more stringent effluent limits for the Steam Electric Power Generating category (40 CFR Part 423) for arsenic, mercury, selenium and nitrogen for wastewater from wet scrubber systems and zero discharge of pollutants in ash transport water. The treatment obligations phase-in as permits are renewed on a five-year cycle from 2018 to 2023. On April 13, 2017, the EPA granted a Petition for Reconsideration and on September 18, 2017, the EPA postponed certain compliance deadlines for two years. Depending on the outcome of appeals and how any final rules are ultimately implemented, the future costs of compliance with these standards may be substantial and changes to FirstEnergy’s operations may result.

#### Regulation of Waste Disposal

Federal and state hazardous waste regulations have been promulgated as a result of the RCRA, as amended, and the Toxic Substances Control Act. Certain CCRs, such as coal ash, were exempted from hazardous waste disposal requirements pending the EPA’s evaluation of the need for future regulation.

In April 2015, the EPA finalized regulations for the disposal of CCRs (non-hazardous), establishing national standards for landfill design, structural integrity design and assessment criteria for surface impoundments, groundwater monitoring and protection procedures and other operational and reporting procedures to assure the safe disposal of CCRs from electric generating plants. On September 13, 2017, the EPA announced that it would reconsider certain provisions of the final regulations. On July 17, 2018, the EPA Administrator signed a final rule extending the deadline for certain CCR facilities to cease disposal and commence closure activities, as well as, establishing less stringent groundwater monitoring and protection requirements. On August 21, 2018, the D.C. Circuit remanded sections of the CCR Rule to the EPA to provide additional safeguards for unlined CCR impoundments that are more protective of human health and the environment.

FirstEnergy or its subsidiaries have been named as potentially responsible parties at waste disposal sites, which may require cleanup under the CERCLA. Allegations of disposal of hazardous substances at historical sites and the liability involved are often unsubstantiated and subject to dispute; however, federal law provides that all potentially responsible parties for a particular site may be liable on a joint and several basis. Environmental liabilities that are considered probable have been recognized on the Consolidated Balance Sheets as of June 30, 2019, based on estimates of the total costs of cleanup, FirstEnergy’s proportionate responsibility for such costs and the financial ability of other unaffiliated entities to pay. Total liabilities of approximately $119 million have been accrued through June 30, 2019. Included in the total are accrued liabilities of approximately $83 million for environmental remediation of former MGP and gas holder facilities in New Jersey, which are being recovered by JCP&L through a non-bypassable SBC. FE or its subsidiaries could be found potentially responsible for additional amounts or additional sites, but the loss or range of losses cannot be determined or reasonably estimated at this time.

### OTHER LEGAL PROCEEDINGS

#### Nuclear Plant Matters

Under NRC regulations, JCP&L, ME and PN must ensure that adequate funds will be available to decommission their retired nuclear facility, TMI-2. As of June 30, 2019, JCP&L, ME and PN had in total approximately $863 million invested in external trusts to be used for the decommissioning and environmental remediation of their retired TMI-2 nuclear generating facility. The values of these NDTs also fluctuate based on market conditions. If the values of the trusts decline by a material amount, the obligation to JCP&L, ME and PN to fund the trusts may increase. Disruptions in the capital markets and their effects on particular businesses and the economy could also affect the values of the NDTs.

On May 10, 2019, FirstEnergy signed a non-binding term sheet with EnergySolutions, LLC. concerning the transfer of TMI-2. This transfer of TMI-2 to EnergySolutions, LLC. will also include the transfer of the external trusts for the decommissioning and environmental remediation of TMI-2 and related liabilities of approximately $900 million as of June 30, 2019. The term sheet also contemplates EnergySolutions, LLC. decommissioning of TMI-2. EnergySolutions, LLC. nuclear decommissioning experience includes the nearly completed Zion Nuclear Power Station in Illinois and the La Crosse Boiling Water Reactor in Wisconsin. There can be no assurance that a definitive agreement will be finalized by the parties and subsequently approved by the NRC and, even if approved, whether the conditions to the closing of the transfer will be satisfied.

#### FES Bankruptcy

On March 31, 2018, FES, including its consolidated subsidiaries, FG, NG, FE Aircraft Leasing Corp., Norton Energy Storage L.L.C. and FGMUC, and FENOC filed voluntary petitions for bankruptcy protection under Chapter 11 of the United States Bankruptcy Code in the Bankruptcy Court. See Note 3, “Discontinued Operations,” for additional information.

#### Other Legal Matters

There are various lawsuits, claims (including claims for asbestos exposure) and proceedings related to FirstEnergy’s normal business operations pending against FE or its subsidiaries. The loss or range of loss in these matters is not expected to be material to FE or its subsidiaries. The other potentially material items not otherwise discussed above are described under Note 12, “Regulatory Matters.”

FirstEnergy accrues legal liabilities only when it concludes that it is probable that it has an obligation for such costs and can reasonably estimate the amount of such costs. In cases where FirstEnergy determines that it is not probable, but reasonably possible that it has a material obligation, it discloses such obligations and the possible loss or range of loss if such estimate can be made. If it were ultimately determined that FE or its subsidiaries have legal liability or are otherwise made subject to liability based on any of the matters referenced above, it could have a material adverse effect on FE’s or its subsidiaries’ financial condition, results of operations and cash flows.

### NEW ACCOUNTING PRONOUNCEMENTS

### Recently Adopted Pronouncements

ASU 2016-02, *"Leases (Topic 842)*" (Issued February 2016 and subsequently updated to address implementation questions): The new guidance requires organizations that lease assets with lease terms of more than 12 months to recognize assets and liabilities for the rights and obligations created by those leases on their balance sheets, as well as new qualitative and quantitative disclosures. FirstEnergy implemented a third-party software tool that assisted with the initial adoption and will assist with ongoing compliance. FirstEnergy chose to apply the requirements of the standard in the period of adoption (January 1, 2019) with no restatement of prior periods. Upon adoption, on January 1, 2019, FirstEnergy increased assets and liabilities by $186 million, with no impact to results of operations or cash flows. See Note 8, "Leases," for additional information on FirstEnergy's leases.

**Recently Issued Pronouncements -** The following new authoritative accounting guidance issued by the FASB has not yet been adopted. Unless otherwise indicated, FirstEnergy is currently assessing the impact such guidance may have on its financial statements and disclosures, as well as the potential to early adopt where applicable. FirstEnergy has assessed other FASB issuances of new standards not described below based upon the current expectation that such new standards will not significantly impact FirstEnergy's financial reporting.

ASU 2016-13, “*Financial Instruments - Credit Losses (Topic 326): Measurement of Credit Losses on Financial Instruments”* (issued June 2016 and subsequently updated): ASU 2016-13 removes all recognition thresholds and will require companies to recognize an allowance for credit losses for the difference between the amortized cost basis of a financial instrument and the amount of amortized cost that the company expects to collect over the instrument’s contractual life. The ASU is effective for fiscal years, and interim periods within those fiscal years, beginning after December 15, 2019, with early adoption permitted.

ASU 2018-15, "*Intangibles-Goodwill and Other-Internal-Use Software (Subtopic 350-40): Customer’s Accounting for Implementation Costs Incurred in a Cloud Computing Arrangement That Is a Service Contract*" (Issued August 2018): ASU 2018-15 requires implementation costs incurred by customers in cloud computing arrangements to be deferred and recognized over the term of the arrangement, if those costs would be capitalized by the customers in a software licensing arrangement. The guidance will be effective for fiscal years, and interim periods within those fiscal years, beginning after December 15, 2019, with early adoption permitted.

## Market risk

As filed, 152 characters.

See “FirstEnergy Corp. Management’s Discussion and Analysis of Financial Condition and Results of Operations — Market Risk Information” in Item 2 above.

## Controls and procedures

As filed, 1,024 characters.

### (a) Evaluation of Disclosure Controls and Procedures

The management of FirstEnergy, with the participation of the Chief Executive Officer and Chief Financial Officer, have reviewed and evaluated the effectiveness of its disclosure controls and procedures, as defined under the Securities Exchange Act of 1934, as amended, in Rules 13a-15(e) and 15d-15(e), as of the end of the period covered by this report. Based on that evaluation, the Chief Executive Officer and Chief Financial Officer of FirstEnergy have concluded that its disclosure controls and procedures were effective as of the end of the period covered by this report.

### (b) Changes in Internal Control over Financial Reporting

During the quarter ended June 30, 2019, there were no changes in internal control over financial reporting (as defined in Rules 13a-15(f) and 15d-15(f) under the Securities Exchange Act of 1934) that have materially affected, or are reasonably likely to materially affect, FirstEnergy’s internal control over financial reporting.

## Risk factors

As filed, 171 characters.

During the quarter ended June 30, 2019, there were no material changes to the risk factors included in our Annual Report on Form 10-K for the year ended December 31, 2018.

Filed Jul 23, 2019.
Source: SEC EDGAR, the filing index for accession 0001031296-19-000034. Last ingested by Listed: Oct 27, 2026, 16:32 ET. No prices; not investment advice.