# Thunder Mountain Gold Inc: Form 10-K for the period ended Dec 31, 2009

- Company: [Thunder Mountain Gold Inc](/companies/thmg.md) (CIK 711034)
- Form: 10-K
- Filed: 2010-03-31
- Accepted by EDGAR: Mar 30, 2010, 21:35 ET
- Period: 2009-12-31
- Accession: 0001052918-10-000098
- Inline XBRL: no
- Main document: https://www.sec.gov/Archives/edgar/data/711034/000105291810000098/tmg10kmar3010s.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/711034/000105291810000098/

## Business

As filed, 4,149 characters.

### Company History

The Company was originally incorporated under the laws of the State of Idaho on November 9, 1935, under the name of Montgomery Mines, Inc. In April, 1978 controlling interest in the Montgomery Mines Corporation was obtained by a group of the Thunder Mountain property holders who then changed the corporate name to Thunder Mountain Gold, Inc. with the primary goal to further develop their holdings in the Thunder Mountain Mining District, Valley County, Idaho.

### Change in Situs and Authorized Capital

The Company moved its situs from Idaho to Nevada, but maintains its corporate offices in Garden City, Idaho. On December 10, 2007, articles of incorporation were filed with the Secretary of State in Nevada for Thunder Mountain Gold, Inc., a Nevada Corporation. The Directors of Thunder Mountain Gold, Inc. (Nevada) were the same as for Thunder Mountain Gold, Inc. (Idaho).

On January 25, 2008, the shareholders approved the merger of Thunder Mountain Gold, Inc. (Idaho) with Thunder Mountain Gold, Inc. (Nevada), which was completed by a share for share exchange of common stock. The terms of the merger were such that the Nevada Corporation was the surviving entity. The number of authorized shares for the Nevada Corporation is 200,000,000 shares of common stock with a par value of $0.001 per share and 5,000,000 shares of preferred stock with a par value of $0.0001 per share.

The Company is structured as follows: The Company owns 100% of the outstanding stock of Thunder Mountain Resources, Inc., a Nevada Corporation. Thunder Mountain Resources, Inc. owns 100% of the outstanding stock of South Mountain Mines, Inc., an Idaho Corporation.

We have no patents, licenses, franchises or concessions which are considered by the Company to be of importance. The business is not of a seasonal nature. Since the potential products are traded in the open market, we have no control over the competitive conditions in the industry. There is no backlog of orders.

There are numerous Federal and State laws and regulation related to environmental protection, which have direct application to mining and milling activities. The more significant of these laws deal with mined land reclamation and wastewater discharge from mines and milling operations. We do not believe that these laws and regulations as presently enacted will have a direct material adverse effect on our operations.

### Subsidiary Companies

On May 21, 2007, the Company filed of articles of incorporation with the Secretary of State in Nevada for Thunder Mountain Resources, Inc., a wholly-owned subsidiary of Thunder Mountain Gold, Inc. G. Peter Parsley was appointed as President, Secretary, Treasurer and sole Director. The financial information for the new subsidiary is included in the consolidated financial statements.

On September 27, 2007, Thunder Mountain Resources, Inc., a wholly-owned subsidiary of Thunder Mountain Gold, Inc., completed the purchase of all the outstanding stock of South Mountain Mines, Inc., an Idaho corporation. The sole asset of South Mountain Mines, Inc. consists of seventeen patented mining claims, totaling approximately 326 acres, located in the South Mountain Mining District, Owyhee County, Idaho. The Stock Purchase Agreement was previously filed as an Exhibit to a Form 8-K filed on June 11, 2007.

### Current Operations

Thunder Mountain Gold is a mineral exploration stage company with no producing mines. The Company intends to remain in the business of exploring for mining properties that have the potential to produce gold, silver, base metals and other commodities.

### Reports to Security Holders

The Registrant does not issue annual or quarterly reports to security holders other than the annual Form 10-K and quarterly Forms 10-Q as electronically filed with the SEC. Electronically filed reports may be accessed at www.sec.gov. Interested parties also may read and copy any materials filed with the SEC at the SEC's Public Reference Room at 450 Fifth Street, N. W., Washington, D.C. 20549. Information may be obtained on the operation of the Public Reference Room by calling the SEC at 1 (800) SEC-0330.

## Risk factors

As filed, 10,760 characters.

Our business, operations, and financial condition are subject to various risks. This is particularly true since we are in the business of conducting exploration for mineral properties that have the potential for discovery of economic mineral resources. We urge you to consider the following risk factors in addition to the other information contained in, or incorporated by reference into, this Annual Report on Form 10-K:

**We have no income and resources and we expect losses to continue for at least the next three years.**

Our only continuing source of funds is through sales of equity positions received from investors, which may not be sufficient to sustain our operations. Any additional funds required would have to come from the issuance of debt or the sale of our common stock. There is no guarantee that funds would be available from either source. If we are unsuccessful in raising additional funds, we will not be able to develop our properties and will be forced to liquidate assets.

### We have no proven reserves.

We have no proven reserves at any of our properties. We only have indicated and inferred, along with assay samples at South Mountain; and assay samples at some of our other exploration properties.

**We will likely need to raise additional capital to continue our operations, and if we fail to obtain the capital necessary to fund our operations, we will be unable to continue our exploration efforts and may have to cease operations.**

At December 31, 2009, we had cash and cash equivalents of $266,207. We are planning to raise additional funds in 2010 to meet our current operating and capital requirements for the next 12 months. However, we have based this estimate on assumptions that may prove to be wrong, and we cannot assure that estimates and assumptions will remain unchanged. For the year ended December 31, 2009 net cash used for operating activities was $519,496. Our future liquidity and capital requirements will depend on many factors, including timing, cost and progress of our exploration efforts, our evaluation of, and decisions with respect to, our strategic alternatives, and costs associated with the regulatory approvals. If it turns out that we do not have enough money to complete our exploration programs, we will try to raise additional funds from public offerings, private placements or loans.

We know that additional financing will be required in the future to fund our planned operations. We do not know whether additional financing will be available when needed or on acceptable terms, if at all. If we are unable to raise additional financing when necessary, we may have to delay our exploration efforts or any property acquisitions or be forced to cease operations. Collaborative arrangements may require us to relinquish our rights to certain of our mining claims.

**Our exploration efforts may be adversely affected by metals price volatility causing us to cease exploration efforts.**

We have no earnings. However, the success of any exploration efforts is derived from the price of metal prices that are affected by numerous factors including: 1) expectations for inflation; 2) investor speculative activities; 3) relative exchange rate of the U.S. dollar to other currencies; 4) global and regional demand and production; 5) global and regional political and economic conditions; and 6) production costs in major producing regions. These factors are beyond our control and are impossible for us to predict.

There is no guarantee that current favorable prices for metals and other commodities will be sustained. If the market prices for these commodities fall we will temporarily suspend or cease exploration efforts.

### Our mineral exploration efforts may not be successful.

Mineral exploration is highly speculative. It involves many risks and often does not produce positive results. Even if we find a valuable mineral deposit, it may be three years or more before production is possible because of the need for additional detailed exploration, pre-production studies, permitting, financing, construction and start up.

During that time, it may become economically unfeasible to produce those minerals. Establishing ore reserves requires us to make substantial capital expenditures and, in the case of new properties, to construct mining and processing facilities. As a result of these costs and uncertainties, we will not be able to develop any potentially economic mineral deposits.

**We face strong competition from other mining companies for the acquisition of new properties.**

If we do find an economic mineral reserve, and it is put into production, it should be noted that mines have limited lives and as a result, we need to continually seek to find new properties. In addition, there is a limited supply of desirable mineral lands available in the United States or elsewhere where we would consider conducting exploration activities. Because we face strong competition for new properties from other exploration and mining companies, some of whom have greater financial resources than we do, we may be unable to acquire attractive new mining properties on terms that we consider acceptable.

**Mining operations may be adversely affected by risks and hazards associated with the mining industry.**

Mining operations involve a number of risks and hazards including: 1) environmental hazards; 2) political and country risks; 3) industrial accidents; 4) labor disputes; 5) unusual or unexpected geologic formations; 6) high wall failures, cave-ins or explosive rock failures, and; 7) flooding and periodic interruptions due to inclement or hazardous weather conditions. Such risks could result in: 1) damage to or destruction of mineral properties or producing facilities; 2) personal injury; 3) environmental damage; 4) delays in exploration efforts; 5) monetary losses, and; 6) legal liability.

We have no insurance against any of these risks. To the extent we are subject to environmental liabilities, we would have to pay for these liabilities. Moreover, in the event that we ever become an operator of a mine, and unable to fully pay for the cost of remedying an environmental problem, should they occur, we might be required to suspend operations or enter into other interim compliance measures.

**Because we are small and do not have much capital, we must limit our exploration. This may prevent us from realizing any revenues, thus reducing the value of the stock and you may lose your investment as a result.**

Because our Company is small and does not have much capital, we must limit the time and money we expend on exploration of interests in our properties. In particular, we may not be able to: 1) devote the time we would like to exploring our properties; 2) spend as much money as we would like to exploring our properties; 3) rent the quality of equipment or hire the contractors we would like to have for exploration; and 4) have the number of people working on our properties that we would like to have. By limiting our operations, it may take longer to explore our properties. There are other larger exploration companies that could and may spend more time and money exploring the properties that we have acquired.

**We will have to suspend our exploration plans if we do not have access to all the supplies and materials we need.**

Competition and unforeseen limited sources of supplies in the industry could result in occasional spot shortages of supplies, like dynamite, and equipment like bulldozers and excavators that we might need to conduct exploration. We have not attempted to locate or negotiate with any suppliers of products, equipment or materials. We will attempt to locate products, equipment and materials after we have conducted preliminary exploration activities on our properties. If we cannot find the products and equipment we need in a timely manner, we will have to delay or suspend our exploration plans until we do find the products and equipment we need.

**We face substantial governmental regulation and environmental risks, which could prevent us from exploring or developing our properties.**

Our business is subject to extensive federal, state and local laws and regulations governing development, production, labor standards, occupational health, waste disposal, use of toxic substances, environmental regulations, mine safety and other matters. New legislation and regulations may be adopted at any time that results in additional operating expense, capital expenditures or restrictions and delays in the exploration, mining, production or development of our properties.

At this time, we have no specific financial obligations for environmental costs. Various laws and permits require that financial assurances be in place for certain environmental and reclamation obligations and other potential liabilities. Once we undertake any trenching or drilling activities, a reclamation bond and a permit will be required under applicable laws. Currently, we have no obligations for financial assurances of any kind, and are unable to undertake any trenching, drilling, or development on any of our properties until we obtain financial assurances pursuant to applicable regulations to cover potential liabilities.

**If we fail to maintain an effective system of internal controls, we may not be able to detect fraud or report our financial results accurately, which could harm our business and we could be subject to regulatory scrutiny.**

Pursuant to Section 404 of the Sarbanes-Oxley Act of 2002 (“Section 404”), we are required to perform an evaluation of our internal controls over financial reporting. In 2010 and future years we will be required to have our independent registered public accounting firm test and evaluate the design and operating effectiveness of such internal controls and publicly attest to such evaluation. We have prepared an internal plan of action for compliance with the requirements of Section 404, and have completed our effectiveness evaluation. We have reported two material weaknesses in our internal controls over financial reporting, and we cannot guarantee that we will not have any material weaknesses as reported by our independent registered public accounting firm. Continuing compliance with the requirements of Section 404 is expected to be expensive and time-consuming. If our independent registered public accounting firm cannot attest to our evaluation, we could be subject to regulatory scrutiny and a loss of public confidence in our internal controls. In addition, any failure to implement required new or improved controls, or difficulties encountered in their implementation, could harm our operating results or cause us to fail to meet our reporting obligations.

## Properties

As filed, 14,213 characters.

The Company, including its subsidiaries, owns rights to claims and properties in the mining areas of Nevada, Idaho and Arizona. None of the properties contain any known probable (indicated) or proven (measured) ore reserves under the definition of ore reserves that meet the definition of reserves as defined by SEC Industry Guide 7.

The Company owns 100% of the outstanding stock of Thunder Mountain Resources, Inc., a Nevada Corporation. Thunder Mountain Resources, Inc. owns 100% of the outstanding stock of South Mountain Mines, Inc., an Idaho Corporation. South Mountain Mines, Inc. owns the South Mountain Project. Thunder Mountain Resources, Inc. completed the direct purchase of 100% ownership of South Mountain Mines, Inc. on September 27, 2007.

### West Tonopah Claim Group, Esmeralda County, Nevada

Eight unpatented lode mining claims totaling approximately 160 acres in the Tonopah Mining district of Esmeralda County, Nevada were located by the Company in 2007. The claims are situated on what has been interpreted to be the offset portion of the “West End” and “Ohio” Veins along the south limb of the Tonopah District West End Rhyolite intrusive dome. The target is projected to be 500 to 800 feet deep and could initially be tested by surface drilling. The typical veins historically mined in this area were 10-20 feet thick, with localized ore shoots up to 50 feet thick. Grades historically mined in the area were 15 to 20 ounces per ton (opt) silver and 0.15 to 0.20 ounce per ton (opt) gold. There is approximately 3,000 feet of relatively unexplored strike length.

### Clover Mountain Claim Group, Owyhee County, Idaho

A geologic reconnaissance program in the fall of 2006 identified anomalous gold, silver, and other base metals in rock chips and soils at Clover Mountain. In February 2007 the Company located the Clover Mountain claim group consisting of 40 unpatented lode mining claims totaling approximately 800 acres. Mineralization appears to be associated with stockwork veining in a granitic stock which has been intruded by northeast and northwest-trending rhyolitic dikes. The property is overlain by locally silicified rhyolitic tuff.

Follow-up rock chip sampling within the area of the anomaly has identified quartz veining with gold values ranging from 3.6 part per million (ppm) to 16.5 ppm. A soil sample program consisting of 215 samples was conducted on 200’x 200’ grid spacing which defined two northeast tending soil anomalies with gold values ranging from 0.020 ppm to 0.873 ppm Au. The gold anomalies are approximately 1,000’ in length and approximately 300’ in width. The gold anomalies are associated with northeast trending structures with accompanying quartz stockwork veining in an exposure of Cretaceous/Tertiary granite. A 2,500’ base metal soil anomaly is observed trending northwest proximal to rhyolite and rhyodacitic dikes which intrude the granitic stock. No work was completed on the claim group in 2009, but additional field work is warranted in the future that may include backhoe trenching and sampling in the significantly anomalous area followed by exploration drilling.

### Trout Creek Claim Group, Lander County, Nevada

The Trout Creek pediment exploration target is located in Lander County, Nevada in T.29N. R44E. The property consists of 60 unpatented mining claims totaling approximately 1,200 acres that are located along the western flank of the Shoshone Range in the Eureka-Battle Mountain mineral trend.

The claims are located along a northwest structural tend which projects into the Battle Mountain mining district to the northwest and into the Goat Ridge window and the Gold Acres, Pipeline, and Cortez area to the southeast. Northwest trending mineralized structures in the Battle Mountain mining district are characterized by elongated plutons, granodiorite porphyry dikes, magnetic lineaments, and regional alignment of mineralized areas. The Trout Creek target is located at the intersection of this northwest trending mineral belt and north-south trending extensional structures.

The Trout Creek target is based on a regional gravity anomaly on a well-defined northwest-southeast trending break in the alluvial fill thickness and underlying bedrock. Previous geophysical work in the 1980s revealed a airborne magnetic anomaly associated with the same structure, and this was further verified and outlined in 2008 by Company personnel using a ground magnetometer. The target is covered by alluvial fan deposits of unknown thickness shed from the adjacent Shoshone Range, a fault block mountain range composed of Paleozoic sediments of both upper and lower plate rocks of the Roberts Mountains thrust. The geophysical anomaly could define a prospective and unexplored target within a well mineralized region.

### Portland Claim Group, Mohave County, Arizona

In 2008 Thunder Mountain Resources, Inc. located 19 unpatented mining claims totaling approximately 380 acres at the Portland property located approximately 30 miles northwest of Kingman, Arizona. The identified gold exploration target is along a detachment at the contact of basement Precambrian gneiss and overlying Tertiary volcanics. Surface samples of silicified rhyolite on the Portland Claim Group range from a trace to 1.35 ppm gold. The alteration and anomalous mineralization is interpreted to be leakage along vertical structures from a potentially mineralized detachment similar to the Portland 1980s open pit mine located approximately 7,500 feet east of the claim group.

### Gold Hill Claim Group, La Paz County, Arizona

In 2008, Thunder Mountain Resources, Inc. staked unpatented mining claims that total approximately 440 acres in the Ellsworth mining district in west central. The Gold Hill Project covers prospective geology for a detachment style precious metals deposit. Select and chip-channel samples of exposures in shallow workings adjacent to the main covered target are highly anomalous in gold with values ranging from 5.14 ppm to 26.8 ppm gold.

Much of the exposed outcrop in the project area consists of Proterozoic gneiss with numerous metamorphic quartz veins with minor copper and gold. Along the eastern edge of a small embayment of alluvial cover, numerous prospect pits expose mineralized gneisses and quartzites that have been sheared at a low angle dipping both to the east and west. Select samples of this material have assayed as high as 26.8 ppm gold, and vertical chip channel samples of the walls of some of the accessible pits have found gold values up to 4.6 ppm gold.

### South Mountain Project, Owyhee County, Idaho

The South Mountain Project consists of 17 patented mining claims totaling approximately 326 acres owned outright by Thunder Mountain Resources, Inc. In addition, the Company has negotiated three leases on private ranch parcels with mineral rights and one patented claim that total approximately 542 additional acres. Thunder Mountain Resources also staked 21 unpatented mining claims totaling approximately 290 acres to cover BLM-managed land that is situated between the various private parcels. All holdings are located in the South Mountain Mining District, Owyhee County, Idaho.

In 2008, Kleinfelder West, Inc., a nationwide engineering and consulting firm, completed a technical report “Resources Data Evaluation, South Mountain Property, South Mountain Mining District, Owyhee County, Idaho”. The technical report was commissioned by Thunder Mountain Resources, Inc. to evaluate all the existing data available on the South Mountain property. Kleinfelder utilized a panel modeling method using this data to determine potential mineralized material remaining and to make a comparison with the resource determined by South Mountain Mines in the mid-1980s.

Additional drilling and sampling will be necessary before the resource can be classified as a mineable reserve, but Kleinfelder West’s calculations provided a potential resource number that is consistent with South Mountain Mines’ (Bowes 1985) reserve model.

During the 2008 field season two core drill holes were drilled to test the downdip extension of the sulfide mineralization in the main mine area, one on the DMEA2 ore shoot and one on the Texas ore shoot. The DMEA 2 target was successful, with two distinct sulfide zones totaling 30 feet being encountered in an overall altered and mineralized intercept of approximately 73 feet. The samples over the entire intercept were detail sampled over the entire 73 feet resulting in a total of 34 discrete sample intervals ranging from 0.5 to 3.7 feet. The samples cut at the Company’s office in Garden City, Idaho and Company personnel delivered the samples to ALS Chemex preparation lab in Elko, Nevada. The analytical results showed two distinct zones of strong mineralization.

| Interval Weighted Average | Gold Fire Assay (ounce per ton) | Silver Fire Assay (ounce per ton) | Zinc (%) | Copper ( %) | Lead ( %) |
| --- | ---: | ---: | ---: | ---: | ---: |
| 657 - 669.5 (12.5 feet) | 0.066 | 1.46 | 7.76 | 0.276 | 0.306 |
| 687 – 704.5 (17.5 feet) | 0.129 | 1.89 | 2.18 | 0.183 | 0.152 |

These intercepts are down dip approximately 300 feet below of the DMEA 2 mineralized zone encountered in Sonneman Level tunnel, and 600 feet below the DMEA 2 zone on the Laxey Level tunnel. The tenor of mineralization the DMEA 2 on the Sonneman is similar to that intercepted in the core hole, including two distinct zones with differing grades.

The second drill hole, TX-1, was designed to test the Texas Ore Shoot approximately 300 feet down dip of the Sonneman Level. The small core hole achieved a depth of 1250 feet, but deviated parallel to the bedding and the targeted carbonate horizon was not intercepted.

Late in 2009, the Company contracted with Gregory P. Wittman (a Qualified Person under Canadian regulations) of Northwestern Groundwater & Geology to incorporate all the new drill and sampling data into a 43-101 Technical Report. This report would be needed as part of the Company’s efforts to obtain a listing on the TSX Venture Exchange in 2010. This work was ongoing at the end of the reporting period.

### Location Map of South Mountain and Clover Mountain Projects

A multi-lithic intrusive breccia outcrop was identified and sampled in 2008 on property leased by the Company. This large area, approximately one mile long and one-half a mile wide, is located several thousand feet south of the main mine area. The intrusive breccia is composed of rounded to sub-rounded fragments of altered intrusive rock and silicified fragments of altered schist and marble. Initial rock chip samples from the outcrop area ranged from 0.49 ppm to 1.70 ppm gold, and follow-up outcrop and float sampling in 2009 yielded gold values ranging from 0.047 ppm to 5.81 ppm. A first pass orientation soil survey completed in 2008 was conducted near the “discovery’ breccia outcrop at a spacing of 100 feet over a distance of 800 feet east/west and 1,000 feet north/south. The soil assays ranged from a trace to 0.31 ppm Gold. Surface mapping indicates that the intrusive breccia covers an area of approximately 5,000 feet x 1,500 feet.

The focus of the 2009 field season was to better define the extent and quality gold mineralization in the intrusive breccia. Systematic mapping and sampling of breccia outcrops were completed along with preliminary geologic mapping. A detailed soil sample grid was designed to cover the breccia area with it orientation at roughly right angles to the mapped local and regional structural trends, and with the slope of the hillside. Samples were taken at a grid point spacing of 400’ X 200’, but were tightened in some areas of favorable geology. A total of 236 soil samples were taken on the grid points and targeted the C soil horizon (where present), sieved in the field to 80 mesh, then delivered by Company personnel to ALS Chemex Laboratory for analytical work. The samples were analyzed for multiple elements.

The results of the soil sampling were plotted and confirmed an extensive gold anomaly with over 75% of the samples containing detectable gold that ranged from up to 701 ppb. Base metal and other element plots supported the structural control of the gold anomaly, and are interpreted to be consistent with high level leakage from a potential porphyry base metal/gold system at depth.

### Competition

We are an exploration stage company. We compete with other mineral resource exploration and development companies for financing and for the acquisition of new mineral properties. Many of the mineral resource exploration and development companies with whom we compete have greater financial and technical resources than us. Accordingly, these competitors may be able to spend greater amounts on acquisitions of mineral properties of merit, on exploration of their mineral properties and on development of their mineral properties. In addition, they may be able to afford greater geological expertise in the targeting and exploration of mineral properties. This competition could result in competitors having mineral properties of greater quality and interest to prospective investors who may finance additional exploration and development. This competition could adversely impact on our ability to finance further exploration and to achieve the financing necessary for us to develop our mineral properties.

### Employees

The Company had three employees during the year ended December 31, 2009. Pete Parsley, Vice President and Exploration Manager, was the only full-time employee. Eric Jones, Chief Financial Officer and Investor Relations, was hired in mid-February 2008 on a three-quarter time basis with a salary of $75,000 per year. For the period of June through September 2009, Mr. Jones voluntarily reduced his salary to $1,000 per month, during which time a total of $21,000 of deferred salary was accrued as a liability. Beginning in October 2009, his salary was increased to $100,000 per year. Jim Collord, President, had voluntarily reduced his salary in June 2008 to a monthly salary of $1,000, which represents less than 10% of typical industry standard. Mssrs. Jones and Collord did this to preserve funding to advance exploration work.

## Legal proceedings

As filed, 585 characters.

The Company has no legal actions pending against it and it is not a party to any suits in any court of law, nor are the directors aware of any claims which could give rise to or investigations pending by the Securities and Exchange Commission or any other governmental agency. There are no pending legal proceedings to which any director, officer or affiliate of the Company, any owner of record or beneficiary of more than 5% of the common stock of the Company, or any security holder of the Company is a party adverse to the Company or has a material interest adverse to the Company.

## Management's discussion and analysis

As filed, 19,794 characters.

The following Management’s Discussion and Analysis of Financial Condition and Results of Operation (“MD&A”) is intended to help the reader understand our financial condition. MD&A is provided as a supplement to, and should be read in conjunction with, our financial statements and the accompanying integral notes (“Notes”) thereto. The following statements may be forward-looking in nature and actual results may differ materially.

### Plan of Operation:

The financial condition of the Company was positive during 2009 and the metals commodity markets were favorable during most of the year. The global economic downturn continued to impact base metal prices, in particular, but prices did pick up during the last half of the year.

The Company underwent a reduced budget program during the year due to the economic downturn. The Company was successful in raising sufficient capital to maintain limited operations, but no drilling program was conducted on the South Mountain Project. Operational focus was on defining the extent and quality of the gold-bearing intrusive breccia zone through additional rock chip and soil sampling, and mapping. Our work was enhanced through the field work by Kinross that spent several weeks in the field mapping and gathering rock chip samples over the breccia zone. The results of this work defined this target area to the point that road building and initial phase drilling is planned in 2010. To this end, a third private parcel land package was leased from a landowner.

The Company has applied for a listing on the TSX Venture Exchange (TSX-V) in Canada. The Company had previously entered into a Letter of Intent on September 10, 2009, with Kenai Resources Ltd., but terminated the agreement on January 27, 2010. If approved by the TSX-V, the listing will allow the Company to raise needed capital on a broad market that facilitates mining exploration and development. Management secured a major Canadian law firm work with our U.S. counterpart for listing approval. The Company has enlisted Haywood Securities, a Canadian Broker Dealer, to assist the Company in evaluating financial options in Canada, and in putting together a funding agreement. The Listing Application was filed in early 2010.

Funding derived from placements will be utilized to advance our South Mountain Project through the initial phases of drilling on the gold anomaly and enhancing the polymetallic replacement ore deposits. A 2010 budget of approximately $1.5 million has been established to complete this next round at South Mountain. An additional amount is budgeted to continue working on our existing properties and to evaluate other opportunities.

The Company’s plan of operation for the next twelve months, subject to obtaining and maintaining sufficient funding, is as follows:

Continue the advanced exploration and pre-development program for the South Mountain Project. This work may include the following:

Up to 10,000 feet of reverse circulation and core drilling will be initiated from the surface to intercept the down-dip extensions of the Texas, DMEA-2, and Laxey ore zones.

Complete first-phase drilling on the gold breccia target to the south of the sulfide mineralization. The program will consist of road construction and drilling 5 to 10 reverse circulation holes along the breccia anomaly to a depth of 1,000 to 1,500 feet. One or two of these holes will be selected for deepening an additional 1,000+ with core to test the potential for deep porphyry contact mineralization.

Further rehabilitation of the Sonneman workings near the Texas ore zone will be initiated so that underground sampling and mapping can be completed.

Continue the baseline environmental work, including the water sampling program.

Continue to work with potential joint venture or capital partners to advance the project into the next phase of exploration and pre-production goals.

Work on the other five properties controlled by the Company will continue, although South Mountain will remain the focus of our efforts. Potential joint venture partners will be solicited on some of the properties in Nevada and Arizona.

The Company maintains its offices in Garden City, Idaho. This is the primary work area for the South Mountain Project and is utilized primarily by Pete Parsley and Eric Jones. Jim Collord will continue to work from his home office in Elko, Nevada as well as in the Boise office.

### Results of Operations:

The Company had no revenues and no production for 2009 or 2008. Total expenses for 2009 decreased by $438,443, or approximately 42%, to $616,528 compared with $1,054,971 for 2008, due largely to a decrease in exploration and management and administrative expense in 2009. Exploration costs in 2009 decreased by $350,087 when compared with 2008, to $98,640, primarily as a result of the limited exploration activities undertaken in 2009 due to limited cash resources. Management and administrative costs in 2009 decreased by $97,154 over 2008, to $374,424 as of December 31, 2009, primarily as a result of the voluntary decrease in salaries to preserve cash. As a result of these decreased expenses in 2009, the Company reported a comprehensive net loss of $560,944 ($0.04 per share) in 2009, compared to a comprehensive net loss of

$1,048,068 ($0.08 per share) in 2008. Net loss per share was based on weighted average number of shares of 15,455,139 for the year ended December 31, 2009 and 13,314,328 for the year ended December 31, 2008.

### Liquidity and Capital Resources:

The audit opinion and notes which accompany our consolidated financial statements for the year ended December 31, 2009, disclose a ‘going concern’ qualification to our ability to continue in business. The consolidated financial statements for the period then ended have been prepared under the assumption that we will continue as a going concern. Such assumption contemplates the realization of assets and the satisfaction of liabilities in the normal course of business. As shown in the consolidated financial statements for the year ended December 31, 2009, we incurred losses and negative cash flows from operating activities for the year then ended, and at December 31, 2009, did not have sufficient cash reserves to cover normal operating expenditures for the following 12 months. These factors raise substantial doubt about our ability to continue as a going concern. The consolidated financial statements do not include any adjustments that might be necessary should we be unable to continue as a going concern.

Our continuation as a going concern is dependent upon our ability to generate sufficient cash flow to meet our obligations on a timely basis, to obtain additional financing as may be required, or ultimately to attain profitability. Potential sources of cash, or relief of demand for cash, include additional external debt, the sale of shares of our stock or alternative methods such as mergers or sale of our assets. No assurances can be given, however, that we will be able to obtain any of these potential sources of cash. We currently require additional cash funding from outside sources to sustain existing operations and to meet current obligations and ongoing capital requirements.

Our plans for the long term continuation as a going concern include financing our future operations through sales of our common stock and/or debt and the eventual profitable exploitation of our mining properties. Our plans may also, at some future point, include the formation of mining joint ventures with senior mining company partners on specific mineral properties whereby the joint venture partner would provide the necessary financing in return for equity in the property.

While the Company does not currently have cash sufficient to support the currently planned aggressive exploration work at South Mountain, we believe that the survivability of Thunder Mountain Gold can be assured by the following:

At December 31, 2009, we had $266,207 cash in our bank accounts.

We expect to close on $1,000,000 of financing in April 2010 to supplement existing funds of the Company. Additional private placements may be required to meet our exploration and corporate expenses incurred during the next 12 months.

Our non-exploration monthly burn rate is currently $25,000, therefore we believe we have cash sufficient to support reduced company operations for the next 12 months.

Management and the Board have not undertaken plans or commitments that exceed the cash available to the Company. We do not include in this consideration any additional investment funds mentioned below. Management is committed to manage expenses of all types so as to not exceed the on-hand cash resources of the Company at any point in time, now or in the future.

We firmly believe we can outlast the current disruptions in the investment markets and continue to attract investment dollars in coming months and years. The Company will also consider other sources of funding, including potential mergers or farm-out of some of its exploration properties.

For the year ended December 31, 2009, net cash used for operating activities was $519,496, consisting of our 2009 net operating loss reduced by non-cash expenses and net cash provided by changes in current assets and current liabilities. Cash used in investing activities for 2009 totaled $29,530 used to purchase mining claims, compared to cash of $33,325 used in 2008 to purchase mining claims and equipment.

Our future liquidity and capital requirements will depend on many factors, including timing, cost and progress of our exploration efforts, our evaluation of, and decisions with respect to, our strategic alternatives, and costs associated with the regulatory approvals. If it turns out that we do not have enough money to complete our exploration programs, we will try to raise additional funds from a second public offering, a private placement, mergers, farm-outs or loans.

We know that additional financing will be required in the future to fund our planned operations. We do not know whether additional financing will be available when needed or on acceptable terms, if at all. If we are unable to raise additional financing when necessary, we may have to delay our exploration efforts or any property acquisitions or be forced to cease operations. Collaborative arrangements may require us to relinquish our rights to certain of our mining claims.

#### Private Placement

On August 7, 2009, the Company closed a private offering of securities solely to accredited investors. The offering consisted of 380,000 Units priced at $0.20 each. Each Unit consisted of a share of common stock, $0.001 par value, and a warrant to purchase common stock for $0.30 per share. As a result of completion of the offering, a total of 380,000 shares of common stock, $0.001 par value, and warrants to acquire 380,000 shares of common stock were issued. Included in the 380,000 units issued, were 5,000 units issued for services valued at $1,000. There were no registration rights granted in connection with the offering. No Placement Agent was used, and no commissions were paid.

On August 10, 2009 the Board unanimously approved a resolution authorizing the re-pricing of warrants, including those issued in the August 7, 2009 private placement, originally exercisable at $0.30 or $0.40 per share, to an exercise price of $0.13 per share which was subsequently raised to $0.15 per share, with such re-pricing valid until November 23, 2009. As a result of completion of the offering, a total of 3,020,000 warrants were exercised for a like number of shares of common stock, $0.001 par value. Commissions of $23,250 were paid to a placement agent, resulting in net cash proceeds of $429,750 to the Company. Additionally, 100,000 shares were issued for warrants with an exercise price of $0.05 per share, for net cash proceeds of $5,000. The net cash proceeds from the exercise of warrants were $434,750. Finally, 30,000 shares were issued to an officer of the Company for warrants exercised at $0.15 in exchange for a reduction of $4,500 in a loan that the officer had previously extended to the Company. There were no registration rights granted in connection with any of these shares. No other commissions were paid, and a total of $450 in Blue Sky fees were paid to the states of Idaho, California and Washington.

The offering and the shares issued for services and option exercises are believed exempt from registration pursuant to the exemption for transactions by an issuer not involving any public offering under Section 4(2) the Securities Act of 1933, as amended. The securities offered, and to be sold and issued in connection with the private placement have not been registered under the Securities Act of 1933, as amended, or any state securities laws and may not be offered or sold in the United States absent registration with the Securities and Exchange Commission or an applicable exemption from registration requirements.

#### Subsequent Events

On January 28, 2010, the Registrant announced that Mr. R. Llee Chapman was appointed as a Director of Thunder Mountain Gold Inc. Mr. Chapman was also appointed as Chair of the Audit Committee, replacing Eric Jones. There was no arrangement or understanding between the director and any other person pursuant to which Mr. Chapman was appointed director.

#### Off Balance-Sheet Arrangements:

During the 12 months ended December 31, 2009 and 2008, the Company had no off-balance sheet arrangements that have or are reasonably likely to have a current or future effect on the Company’s financial condition, changes in financial condition, revenues or expenses, results of operations, liquidity, capital expenditures or capital resources that are material to investors.

### Contractual Obligations

During 2008, two lease arrangements were made with land owners that own land parcels adjacent to the Company’s South Mountain patented and unpatented mining claims. The leases both were for a seven-year period, with options to renew, with annual payments (based on $20 per acre) listed in the following table. The leases have no work requirements.

| Contractual obligations Total\* | Payments due by period Less than 1 year | 2-3 years | 3-5 years | More than 5 years |  |
| --- | ---: | ---: | ---: | ---: | ---: |
| Acree Lease (yearly, June) | $11,300 | $2,260 | $4,520 | $4,520 | $0 |
| Lowry Lease (yearly, October)\*\* | $37,700 | $7,540 | $15,080 | $15,080 | $0 |
| **Total** | $49,000 | $9,800 | $19,600 | $19,600 | $0 |

Amounts shown are for the lease periods years 3 through 7, a total of 5 years that remain after 2009, the second year of the lease period.

The Lowry lease has an early buy-out provision for 50% of the remaining amounts owed in the event the Company desires to drop the lease prior to the end of the first seven-year period.

### Critical Accounting Policies

We have identified our critical accounting policies, the application of which may materially affect the financial statements, either because of the significance of the financials statement item to which they relate, or because they require management’s judgment in making estimates and assumptions in measuring, at a specific point in time, events which will be settled in the future. The critical accounting policies, judgments and estimates which management believes have the most significant effect on the financial statements are set forth below:

a)

Estimates. Our management routinely makes judgments and estimates about the effect of matters that are inherently uncertain. As the number of variables and assumptions affecting the future resolution of the uncertainties increase, these judgments become even more subjective and complex. Although we believe that our estimates and assumptions are reasonable, actual results may differ significantly from these estimates. Changes in estimates and assumptions based upon actual results may have a material impact on our results of operation and/or financial condition.

b)

Stock-based Compensation. The Company records stock-based compensation in accordance with ASC 718, “Compensation – Stock Compensation” using the fair value method. All transactions in which goods or services are the consideration received for the issuance of equity instruments are accounted for based on the fair value of the consideration received or the fair value of the equity instrument issued, whichever is more reliably measurable.

c)

Income Taxes. We have current income tax assets recorded in our financial statements that are based on our estimates relating to federal and state income tax benefits. Our judgments regarding federal and state income tax rates, items that may or may not be deductible for income tax purposes and income tax regulations themselves are critical to the Company’s financial statement income tax items.

### Adopted Accounting Pronouncements

On January 1, 2009, the Company adopted a Business combination policy (“ASC 805”) which changes the method of accounting for assets acquired and liabilities assumed in a business combination. These changes include:

Acquisition costs are generally expensed as incurred;

Non controlling interests are valued at fair value at the acquisition date;

Acquired contingent liabilities are recorded at fair value at the acquisition date and subsequently measured at either the higher of such amount or the amount determined under existing guidance for non acquired contingencies;

In-process research and development are recorded at fair value as an indefinite-lived intangible asset at the acquisition date;

Restructuring costs associated with a business combination are generally expensed subsequent to the acquisition date; and

Changes in deferred tax asset valuation allowances and income tax uncertainties after the acquisition date generally do affect income tax expense.

The adoption of this guidance did not have a material effect on the Company’s financial statements.

In April 2009, the FASB amended guidance (“ASC 820”) to require disclosures about fair value of financial instruments for interim reporting periods of publicly traded companies as well as in annual financial statements. It was effective for interim reporting periods ending after June 15, 2009, and was adopted without a material effect on the Company’s financial position or results of operations.

ASC 820 expands disclosure requirements to include the following information for each major category of assets and liabilities that are measured at fair value on a recurring basis:

The fair value measurement;

a)

The level within the fair value hierarchy in which the fair value measurements in their entirety fall, segregating fair value measurements using quoted prices in active markets for identical assets or liabilities (Level 1), significant other observable inputs (Level 2), and significant unobservable inputs (Level 3);

b)

For fair value measurements using significant unobservable inputs (Level 3), a reconciliation of the beginning and ending balances, separately presenting changes during the period attributable to the following:

1.

Total gains or losses for the period (realized and unrealized), segregating those gains or losses included in earnings (or changes in net assets), and a description of where those gains or losses included in earnings (or changes in net assets) are reported in the statement of operations;

2.

The amount of these gains or losses attributable to the change in unrealized gains or losses relating to those assets and liabilities still held at the reporting period date and a description of where those unrealized gains or losses are reported;

3.

Purchases, sales, issuances, and settlements (net); and

4.

Transfers in and/or out of Level 3.

## Controls and procedures

As filed, 5,232 characters.

### Evaluation of Disclosure Controls and Procedures

At the end of the period covered by this report, an evaluation was carried out under the supervision of, and with the participation of, the Company’s management, including the Chief Executive Officer and Chief Financial Officer, of the effectiveness of the design and operation of the Company’s disclosure controls and procedures (as defined in Rule 13a – 15(e) and Rule 15d – 15(e) of the Securities and Exchange Act of 1934, as amended). Based on that evaluation, the Chief Executive Officer and Chief Financial Officer have concluded that as of the end of the period covered by this report, the Company’s disclosure controls and procedures were adequately designed and effective in ensuring that information required to be disclosed by the Company in its reports that it files or submits to the SEC under the Exchange Act, is recorded, processed, summarized and reported within the time period specified in applicable rules and forms.

Our Chief Executive Officer and Chief Financial Officer have also determined that the disclosure controls and procedures are effective to ensure that material information required to be disclosed in our reports filed under the Exchange Act is accumulated and communicated to our management, including the Company’s Chief Executive Officer and Chief Financial Officer, to allow for accurate required disclosure to be made on a timely basis.

### Management’s Report on Internal Control over Financial Reporting

The Company’s management is responsible for establishing and maintaining adequate internal control over financial reporting. The Company’s internal control over financial reporting is a process designed under the supervision of its Chief Executive Officer and Chief Financial Officer to provide reasonable assurance regarding the reliability of financial reporting and the preparation of the Company’s financial statements for external reporting in accordance with accounting principles generally accepted in the United States of America. Management evaluates the effectiveness of the Company’s internal control over financial reporting using the criteria set forth by the Committee of Sponsoring Organizations of the Treadway Commission (COSO) in Internal Control – “Integrated Framework.” Management, under the supervision and with the participation of the Company’s Chief Executive Officer and Chief Financial Officer, assessed the effectiveness of the Company’s internal control over financial reporting as of December 31, 2009 and concluded that it is ineffective in assuring that the financial reports of the Company are free from material errors or misstatements.

Management has identified two material weaknesses and is taking action to remedy and remove the weakness in its internal controls over financial reporting:

Lack of an independent board of directors, including an independent financial expert. In June 2008, the Company added one independent director, and subsequent to the December 31, 2009, added another independent director, the latter of which has been designated the Company’s independent financial expert. The current board of directors is evaluating expanding the board of directors to include additional independent directors. The current board is composed of six members and may be expanded to as many as nine members under the Company’s Articles of Incorporation and By-Laws.

Inappropriate Segregation of Duties, as the same Director was responsible for initiating and recording transactions, thereby creating segregation of duties weakness.

Because of the inherent limitations in all control systems, no evaluation of controls can provide absolute assurance that misstatements due to error or fraud will not occur or that all control issues and instances of fraud, if any, within the Company have been detected. These inherent limitations include the realities that judgments in decision making can be faulty and that breakdowns can occur because of simple error or mistake. The design of any system of controls is based in part on certain assumptions about the likelihood of future events, and there can be no assurance that any design will succeed in achieving its stated goals under all potential future conditions. Projections of any evaluation of controls effectiveness to future periods are subject to risks.

This annual report does not include an attestation report of the Company’s registered public accounting firm regarding internal control over financial reporting. Management’s report was not subject to attestation by the Company’s registered public accounting firm pursuant to temporary rules of the Securities and Exchange Commission that permit the Company to provide only management’s report in this annual report.

### Changes in internal controls over financial reporting

During the quarter ended December 31, 2009, there have been no changes in the Company’s internal control over financial reporting that have materially affected, or are reasonably likely to materially affect, the Company’s internal control over financial reporting. Subsequent to the close of the quarter an additional independent director was added to help alleviate the material weakness identified above.

Filed Mar 31, 2010.
Source: SEC EDGAR, the filing index for accession 0001052918-10-000098. Last ingested by Listed: Nov 12, 2026, 20:56 ET. No prices; not investment advice.
