# Thunder Mountain Gold Inc: Form 10-Q for the period ended Mar 31, 2015

- Company: [Thunder Mountain Gold Inc](/companies/thmg.md) (CIK 711034)
- Form: 10-Q
- Filed: 2015-05-14
- Accepted by EDGAR: May 14, 2015, 14:24 ET
- Period: 2015-03-31
- Accession: 0001052918-15-000241
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/711034/000105291815000241/thmg10qmay1215final.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/711034/000105291815000241/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2015-03-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Interest expense | 3 months, 2015-01-01 to 2015-03-31 | −$24.4k | us-gaap:InterestExpense |
| Net income | 3 months, 2015-01-01 to 2015-03-31 | −$237.3k | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2015-01-01 to 2015-03-31 | −$0.01 | us-gaap:EarningsPerShareBasicAndDiluted |
| Operating cash flow | 3 months, 2015-01-01 to 2015-03-31 | −$156.2k | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Cash and equivalents | at 2015-03-31 | $125.8k | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2015-03-31 | $134.7k | us-gaap:AssetsCurrent |
| Total assets | at 2015-03-31 | $614.2k | us-gaap:Assets |
| Current liabilities | at 2015-03-31 | $130.3k | us-gaap:LiabilitiesCurrent |
| Shareholders' equity | at 2015-03-31 | $483.8k | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 32,438 characters.

The following Management’s Discussion and Analysis of Financial Condition and Results of Operation (“MD&A”) is intended to help the reader understand our financial condition. MD&A is provided as a supplement to, and should be read in conjunction with, our financial statements and the accompanying integral notes (“Notes”) thereto. The following statements may be forward-looking in nature and actual results may differ materially.

### Plan of Operation:

*FORWARD LOOKING STATEMENTS: The following discussion may contain forward-looking statements that involve a number of risks and uncertainties. Factors that could cause actual results to differ materially include the following: inability to locate property with mineralization, lack of financing for exploration efforts, competition to acquire mining properties; risks inherent in the mining industry, and risk factors that are listed in the Company's reports and registration statements filed with the Securities and Exchange Commission.*

The Company’s financial position remained unchanged during the first quarter of 2015 and the metals commodity markets were mostly unchanged during the year. Equity markets will likely open up periodically in response to favorable price movements in certain metals during 2015, providing some companies with the opportunity to take advantage of short periods of positive sentiment in the market. However, until metal price momentum swings to the positive, equity financing in the mining industry will remain unpopular. Analyst estimates for 2015 are for volatile metals markets.

The Company continued to operate on a limited budget in 2015 while the Company\`s funding partner in the South Mountain Mine pursues additional financing.

The Company’s plan of operation for the next twelve months, subject to business conditions, is as follows:

Continue the advanced pre-development and exploration at the South Mountain Project. This work may include the following:

Continue with the rehabilitation of the Laxey and Sonneman workings, utilizing Widman Contactors, Inc. to conduct the mining.

Initiate 5,000 to 7,000 feet of underground core drilling from within the Laxey and Sonneman levels, at drill stations engineered to define the mineralization and to intercept the down-dip extensions of the Texas, DMEA-2, and Laxey ore zones.

Complete geophysical work on the Intrusive Breccia target. This will consist of an extensive helicopter draped aeromagnetic survey plus resistivity and IP work and will help define specific targets within and peripheral to the mineralized intrusive complex.

Continue the baseline environmental work.

Due to failures and defaults regarding of ISGC II\`s management of the South Mountain Project, THMG/SMMI was inserted as Manager of the OGT LLC as of Jan. 27th, 2015 by way of Management Committee meeting. The parties are currently negotiating to determine whether THMG will seek judicial ratification of this OGT LLC determination.

Work on the Trout Creek Project will continue in 2015, although the South Mountain Project will still remain the focus. At the Trout Creek Project, the following is planned:

Drill pre-defined drill target on the Joint Exploration area with Newmont Mining.

Analyze the drill data, and prepare for further exploration in the 2015/2016 seasons.

Continue geophysical interpretation of the valley area. Define potential drill targets and develop additional drill targets for remaining field season of 2015.

### South Mountain Project, Owyhee County, Idaho

The land package at South Mountain consists of a total of approximately 1,158 acres, consisting of (i) 17 patented claims (326 acres) the Company owns outright; (ii) lease on private ranch land (542 acres); and, (iii) 21 unpatented lode mining claims on BLM managed land (290 acres). The Company is negotiating for additional private land surrounding the existing land package. All holdings are located in the South Mountain Mining District, Owyhee County, Idaho.

The property is located approximately 70 air miles southwest of Boise, Idaho and approximately 24 miles southeast of Jordan Valley, Oregon. It is accessible by highway 95 driving south from the Boise area to Jordan Valley Oregon, then by traveling southeast approximately 22 miles back into Idaho, via Owyhee County road that is dirt and improved to within 4 miles of historic mine site. The last 4 miles up the South Mountain Mine road are unimproved dirt road. The property is accessible year-round to within 4 miles of the property, where the property is accessible from May thru October without plowing snow. There is power to within 4 miles of the site as well. The climate is considered high desert. The Company has water rights on the property, and there is a potable spring on the property that once supplied water to the main camp.

During the development of the Sonneman Level during 2012-2013 several massive sulfide mineralized zones were mined through. Detailed rib sampling along some of these zones yielded the following results:

| Location / Ore Shoot | Sampled Length (Feet) | Tunnel Station (ft) | Gold | Silver | Zinc | Copper | Lead |
| --- | ---: | ---: | --- | --- | ---: | ---: | ---: |
| DMEA 2 | 80 | 2100 | 0.147 opt | 4.76 opt | 21.9% | 0.38% | 0.51% |
| DMEA 3 | 15 | 2200 | 0.354 opt | 5.63 opt | 20.2% | 2.71% | 0.60% |
| Muck Bay 4 | 30 | 1480 | 0.0055 opt | 6.30 opt | 1.9% | 1.00% | 0.50% |
| Muck Bay 4 B | 15 | 1500 | 0.0055 opt | 6.71 opt | 14.1% | 2.30% | 0.59% |
| Muck Bay 3 | 30 | 1078 | Tr | 6.23 opt | 7.5% | 0.36% | 3.77% |
| Laxey Shaft Rind | 25 | 778 | 0.02 opt | 15.0 opt | 18.5% | 0.41% | 1.03% |

***Note: Sample channel lengths were 5 to 10 feet. All samples were analyzed by ALS Chemex.***

**HIGHLIGHT: Rib Sample Results on Sonneman: 80 Feet of 21.9% Zinc, 0.147 opt Gold, 4.76 opt Silver, 0.38% Copper and 0.51% Lead.**

### Other Underground Pre-Development Work

The reconstruction of the Sonneman and Laxey drifts continued successfully until January 2014 when the Project went into care and maintenance. The Sonneman Level advanced 2,711 feet from the portal and is constructed to 12 feet X 12 feet for future development and mining. There is approximately 350 feet of engineered drift to construct in order to reach the historic Texas ore zone located at the end of the old workings. This advance to and through this zone will allow for drill stations and underground drilling to further define the high-grade resource encountered by William Bowes group in the 1980s.

The historic 2,200-foot long Laxey Level drift has been rehabilitated to 10 feet by 10 feet for a distance of approximately 720 feet. At that point the old tunnel had recently collapsed in at an intrusive dike and preparations were being made to advance through the caved area. This old tunnel was rehabilitated and accessed along its full length in 2008, at which point it intercepted the Texas ore shoot, one of many that had limited mining during and after the World War II period. Excellent high grade massive sulfide is exposed in this area, and our drilling during 2013 proved its continuity between the Laxey Level and the surface, an up-dip distance of nearly 400 feet.

### 2013 Core Drilling Program

The surface drilling program was completed in November, 2013. Twelve core holes totaling 7,535.5 feet were drilled and targeted three separate ore shoots:

1.

Seven holes targeted the Texas Ore Shoot from the surface to the Laxey Level, and between the Laxey and Sonneman Levels. The continuity of sulfide mineralization was confirmed and the surface to Laxey Level offers an upside to the ore shoot that has never been explored. Additional drilling, primarily from underground, will be necessary to move this into a reserve category.

***Long section looking north showing the Laxey and Sonneman tunnels and locations of some of the core drill holes.***

2.

Three holes were drilled to test the DMEA 2 Ore Shoot between the two levels. The best hole, DMEA13-09, intercepted 15 feet of massive sulfide with a grade of 0.22 opt gold, 2.67 opt silver, 20.2% zinc, 0.27% copper and 0.35% lead.

3.

Two holes tested the down dip extension of the ore shoot mined during World War II from the 800-foot deep Laxey Shaft. Encouraging mineralization was intercepted in both holes, with the best being LX13-11 that cut 34 feet of sulfide grading 0.004 opt gold, 4.41 opt silver and 7.18% zinc.

A detailed underground fan drilling program commenced as soon as the surface drilling program was completed. Drilling on the DMEA 2 and Texas Ore Shoot were planned in order to define a mineable resource, but unfortunately the program was terminated after the first fan was drilled in the DMEA 2 down dip target. The results of the drilling are summarized below:

| DMEA 2 Core Hole | Length | Dip | Intercept Footage | Gold | Silver | Zinc | Copper | Lead |
| --- | ---: | ---: | --- | --- | --- | ---: | ---: | ---: |
| DM2UC13-13 | 329 | -24 | 162-184 (22) | 0.086 opt | 4.72 opt | 12.31% | 0.48% | 1.56% |
| DM2UC13-14 | 363 | -17 | 163.5-256.5 (93) | .082 opt | 12.77 opt | 13.79% | 0.45% | 7.07% |
| DM2UC13-14 |  |  | 301-331 (30) | 0.127 opt | 3.17 opt | 14.46% | 0.29% | 0.67% |
| DM2UC13-15 | 298 | -31 | 98-108 (10) | 0.01 opt | 6.84 opt | 8.30% | 1.88% | 0.16% |
| DM2UC13-16 | 306 | -36 | 85-111 (26) | 0.01 opt | 5.40 opt | 3,89% | 1.55% | 0.34% |
| DM2UC13-17 | 347 | -12 | 210-322 (112) | 0.07 opt | 2.31 opt | 9.84% | 0.36% | 0.28% |
| DM2UC13-18 | 347 | -47 | 95-103 (8) | Tr | 0.53 opt | 2.60% | minor | 0.28% |

***Results from the first drill fan testing the down dip extension of the historic DMEA ore zones.***

This drilling confirms and enhances the DMEA 2 and DMEA 3 massive sulfide zone mined during the completion of the Sonneman Tunnel. (The rib sample results from these zones are reported above.) Two additional fans were planned, one at a shallower angle and one further down dip. There is some indication that the two or three zones may be coalescing with depth. Additional fans are planned, but were put on hold due to lack of funding.

The advance of the Sonneman Level tunnel was stopped about 300 feet short of the primary target, the Texas Ore Shoot. The caved older tunnel built by Bowes around 1980 intercepted approximately 70 feet of sulfide grading 0.26 opt gold, 7.42 opt silver, 14.0% zinc, 3.7% lead and 0.16% copper. Once the new tunnel advances and drill stations construction, fan drilling is planned to test the up and down dip of this attractive zone.

Management remains encouraged by results of the underground pre-development work completed to date. The South Mountain Model continues to prove that the continuation of the replacement sulfide mineralized ore shoots at depth. Detailed follow-up core drilling will be needed to better define the quality and quantity of the historic ore zones at depth.

Other work on the Project included access road work, infrastructure facilities and some environmental remediation. In order to remediate any water contamination from the historic Sonneman waste rock dump, a 440-foot 48-inch culvert was constructed so that Williams Creek would flow beneath the waste rock.

### Status of the Operating Agreement with Idaho State Gold Company (ISGC II)

On November 8, 2012, the Company and Idaho State Gold Company II LLC (“ISGC”) formed Owyhee Gold Trust, LLC, (“OGT”) a limited liability Corporation. As part of the Agreement, 6,000 membership units were created and represented SMMI’s contribution as its initial contribution to OGT. The Agreement calls for ISGC to fund operations totaling $18 million, or $8 million if SMMI exercises its participation option. SMMI holds all of the LLC membership units until such time as ISGC II makes the stipulated qualifying expenditures (as defined by the operating agreement).

Currently, the project is in a care and maintenance status.

### Property History

The limited historic production peaked during World War II when, based on smelter receipts, the production of direct shipped ore totaled 53,653 tons containing 3,118 ounces of gold, 566,439 ounces of silver, 13,932 pounds of copper, 2,562,318 pounds of lead and 15,593,061 pounds of zinc. In addition to the direct-ship ore, a flotation mill was constructed and operated during the late-1940s and early-1950s.

| Metal | Grade | Total Metal |
| --- | --- | --- |
| Gold Silver Copper Lead Zinc | 0.058 opt 10.6 opt 1.4% 2.4% 14.5% | 3,120 oz 566,440 oz 1,485,200 lbs 2,562,300 lbs 15,593,100 lbs |

### Crude Ore Shipments: 1941-1953 Total Tons: 53,653

South Mountain Mines Inc. controlled the patented claims from 1975 to the time the Company purchased the entity in 2007. They conducted extensive exploration work including extending the Sonneman Level by approximately 1,500 feet to intercept the down-dip extension of the Texas sulfide mineralization mined on the Laxey Level some 300 feet above the Sonneman. High grade sulfide mineralization was intercepted on the Sonneman Extension. In 1985 they did a feasibility study based on polygonal ore blocks exposed in the underground workings and drilling. This resulted in a historic resource of approximately 470,000 tons containing 23,500 ounces of gold, 3,530,000 ounces of silver, 8,339,000 pounds of copper, 13,157,000 pounds of lead and 91,817,000 lbs of zinc. Although they determined positive economics, the project was shut down and placed into care and maintenance.

In 2008, the Company engaged Kleinfelder, Inc., a nationwide engineering and consulting firm, to complete a technical report “Resources Data Evaluation, South Mountain Property, South Mountain Mining District, Owyhee County, Idaho”. The technical report was commissioned by Thunder Mountain Resources, Inc. to evaluate all the existing data available on the South Mountain property. Kleinfelder utilized a panel modeling method using this data to determine potential mineralized material remaining and to make a comparison with the resource determined by South Mountain Mines in the mid-1980s.

Additional drilling and sampling will be necessary before the resource can be classified as a mineable reserve, but Kleinfelder’s calculations provided a potential resource number that is consistent with South Mountain Mines’ (Bowes 1985) reserve model.

Late in 2009, the Company contracted with Northwestern Groundwater & Geology to incorporate all the new drill and sampling data into an NI 43-101 Technical Report. This report was completed as part of the Company’s dual listing on the TSX Venture Exchange in 2010. The NI 43-101 can be reviewed on the Company\`s website at www.thundermountaingold.com, or on www.SEDAR.com.

### Gold Breccia Area

No additional work has been completed on the multi-lithic intrusive breccia outcrop that was identified and sampled in 2008 on property leased by the Company. An extensive ground magnetic survey consisting of approximately 81 line miles was completed over the project area by Jim Wright Geophysics and was designed to tie the sediment hosted mineralization with the Gold Breccia Zone. Additional geophysics will be justified and will consist of deep penetrating induced polarization work.

This large area (approximately one mile long and one-half a mile wide) is located several thousand feet south of the main mine area. The intrusive breccia is composed of rounded to sub-rounded fragments of altered intrusive rock and silicified fragments of altered schist and marble. Initial rock chip samples from the outcrop area ranged from 0.49 ppm to 1.70 ppm gold, and follow-up outcrop and float sampling in 2009 yielded gold values ranging from 0.047 ppm to 5.81 ppm. A first pass orientation soil survey completed in 2008 was conducted near the “discovery’ breccia outcrop at a spacing of 100 feet over a distance of 800 feet east/west and 1,000 feet north/south. The soil assays ranged from a trace to 0.31 ppm Gold. Surface mapping indicates that the intrusive breccia covers an area of approximately 5,000 feet x 1,500 feet.

Management believes that the “first-pass” drill results from the intrusive breccia drilling proves the existence of a significant gold system in an intrusive package that is related to the polymetallic mineralization in the carbonate in the historic mine area. An IP survey is planned to isolate potential feeder structures and to evaluate the contact between the metasediments and the gold-bearing intrusive.

Qualified Person – Edward D. Fields is the Qualified Person as defined by National Instrument 43-101 responsible for the technical data reported in this news release.

This property is without known reserves and the proposed program is exploratory in nature according to Instruction 3 to paragraph (b)(5) of Industry Guide 7. There are currently no permits required for conducting exploration in accordance with the Company\`s current board approved exploration plan.

### Trout Creek Project, Lander County, Nevada

The Trout Creek pediment exploration gold target is located along the eastern flank of Reese River Valley along the pediment of the Shoshone Range in Lander County, Nevada. The claim package consists of 78 unpatented mining claims (approximately 1560 acres) that are situated along a recognizable structural zone in the Eureka-Battle Mountain mineralized gold trend. In addition to the claims, a joint venture exploration agreement with Newmont Mining covering approximately 25 square miles on which Newmont owns the mineral rights on about half that amount. The mineral rights consist of their ownership of the Continental Railroad sections.

The Project is located approximately 155 air miles northeast of Reno, Nevada, or approximately 20 miles SW of Battle Mountain, Nevada, in Sections 10, 11, 14, 16, 21, 22, 27; T.29N.; R.44E. Mount Diablo Baseline & Meridian, Lander County, Nevada. Latitude: 40 23’ 36” North, Longitude: 117 00’ 58” West. The property is accessible by traveling south from Battle Mountain Nevada on state highway 305, which is paved. The project is generally accessible year round. There is no power, no water other than seasonal surface precipitation and associated streams that flow from the Shoshone Range, and there are no improvements on the property.

All those certain unpatented lode claims situated in Lander County, Nevada, more particularly described as follows below:

| Name of Claim | Lander Co. Doc. No. | BLM NMC No. |
| --- | ---: | ---: |
| TC-1 | 0248677 | 965652 |
| TC-2 | 0248678 | 965653 |
| TC-3 | 0248679 | 965654 |
| TC-4 | 0248680 | 965655 |
| TC-5 | 0248681 | 965656 |
| TC-6 | 0248682 | 965657 |
| TC-7 | 0248683 | 965658 |
| TC-8 | 0248684 | 965659 |
| TC-9 | 0248685 | 965660 |
| TC-10 | 0248686 | 965661 |
| TC-11 | 0248687 | 965662 |
| TC-12 | 0248688 | 965663 |
| TC-31 | 0248707 | 965682 |
| TC-32 | 0248708 | 965683 |
| TC-51 | 0248727 | 965702 |
| TC-52 | 0248728 | 965703 |
| TC-53 | 0248729 | 965704 |
| TC-54 | 0248730 | 965705 |
| TC-55 | 0248731 | 965706 |

16

| Name of Claim | Lander Co. Doc. No. BLM NMC No. |
| --- | ---: |
| TC-56 | 0248732 965707 |
| TC-57 | 0248733 965708 |
| TC-58 | 0248734 965709 |
| TC-59 | 0251576 988946 |
| TC-60 | 0251577 988947 |
| TC-61 | 0251578 988948 |
| TC-62 | 0251579 988949 |
| TC-63 | 0251580 988950 |
| TC-64 | 0251581 988951 |
| TC-65 | 0251582 988952 |
| TC-66 | 0251583 988953 |
| TC-67 | 0251584 988954 |
| TC-68 | 0251585 988955 |
| TC-69 | 0251586 988956 |
| TC-70 | 0251587 988957 |
| TC-71 | 0251588 988958 |
| TC-72 | 0251589 988959 |
| TC-73 | 0251590 988960 |
| TC-74 | 0251591 988961 |
| TC-75 | 0251592 988962 |
| TC-76 | 0251593 988963 |
| TC-77 | 0251594 988964 |
| TC-78 | 0251595 988965 |
| TC-79 | 0251596 988966 |
| TC-80 | 0251597 988967 |
| TC-81 | 0251598 988968 |
| TC-82 | 0251599 988969 |
| TC-83 | 0251600 988970 |
| TC-84 | 0251601 988971 |
| TC-85 | 0251602 988972 |
| TC-86 | 0251603 988973 |
| TC-87 | 0251604 988974 |
| TC-88 | 0251605 988975 |
| TC-89 | 0251606 988976 |
| TC-90 | 0251607 988977 |
| TC-91 | 0251608 988978 |
| TC-92 | 0251609 988979 |
| TC-93 | 0251610 988980 |
| TC-94 | 0251611 988981 |
| TC-95 | 0251612 988982 |
| TC-96 | 0251613 988983 |

An extensive data package was made available by Newmont to Thunder Mountain Gold, and follow-up fieldwork was undertaken once the agreement was finalized. This fieldwork consisted of mapping the altered and mineralized structures that can be followed through the Shoshone Range. Of importance is that these structures align with the Cortez-Pipeline deposits and the Phoenix deposit (part of the Eureka-Battle Mountain-Getchell Trend).

In addition to the geologic fieldwork, Wright Geophysics conducted a ground gravity survey and CSMAT over the pediment target area and this provided insight into the gravel-bedrock contact as well as defining the favorable structural setting within the buried bedrock. An untested drill target was identified under the gravel pediment along these structures, and the geophysics showed that the bedrock was within a reasonable depth for exploration drilling and potential mining if a significant mineralization is encountered.

Lack of an adequate budget prevented drilling during 2014, but Newmont and the Company are currently amending the agreement to modify the work commitment timeframe. It is anticipated that funding will be available during the 2015 season and one or two reverse circulation holes can test the bedrock beneath the gravel along the mineralized structures.

The Trout Creek target is based on a regional gravity anomaly on a well-defined northwest-southeast trending break in the alluvial fill thickness and underlying bedrock. Previous geophysical work in the 1980s revealed an airborne magnetic anomaly associated with the same structure, and this was further verified and outlined in 2008 by Company personnel using a ground magnetometer. The target is covered by alluvial fan deposits of unknown thickness shed from the adjacent Shoshone Range, a fault block mountain range composed of Paleozoic sediments of both upper and lower plate rocks of the Roberts Mountains thrust. The geophysical anomaly could define a prospective and unexplored target within a well mineralized region.

The ongoing exploration field work, including claim maintenance and assessment, is financed by the Company through sales of unregistered common stock funded by the Company through private placements with accredited investors. Future work will be funded in the same manner or through a strategic partnership with another mining company. The Company is attempting to consolidate the land package to cover a larger area of the positive geophysical target in the pediment by acquiring and/or joint venturing adjoining mineral property.

There are currently no environmental permits required for the planned exploration work on the property. In the future, a notice of intent may be required with the Bureau of Land Management. This property is without known reserves and the proposed program is exploratory in nature according to Instruction 3 to paragraph (b)(5) of Industry Guide 7.

### Competition

We are an exploration stage company. We compete with other mineral resource exploration and development companies for financing and for the acquisition of new mineral properties. Many of the mineral resource exploration and development companies with whom we compete have greater financial and technical resources than us. Accordingly, these competitors may be able to spend greater amounts on acquisitions of mineral properties of merit, on exploration of their mineral properties and on development of their mineral properties. In addition, they may be able to afford greater geological expertise in the targeting and exploration of mineral properties. This competition could result in competitors having mineral properties of greater quality and interest to prospective investors who may finance additional exploration and development. This competition could adversely impact on our ability to finance further exploration and to achieve the financing necessary for us to develop our mineral properties.

### Employees

The Company had no paid employees during the quarter ended updated March 31, 2015.

### Results of Operations:

The Company had no revenues and no production for the quarter ending March 31, 2015. Total expenses for the quarter ending March 31, 2015 increased from the compared first quarter in 2014 by $147,976, up 69% in total expenses of $212,951. Exploration expenses for the three months ending March 31, 2015, slightly decreased by $156, when compared to the same period in 2014. Legal and accounting fees for continue to increase from 2014 this increase of $92,040 to $133,281, a 69% increase over first quarter 2014 legal and accounting expenses of $41,241. Management and administrative expense increased $56,092 or 75%, to $75,006 compared to 2014 quarter expense of $18,914.

### Liquidity and Capital Resources:

The consolidated financial statements for the period ended March 31, 2015, have been prepared under the assumption that we will continue as a going concern. Such assumption contemplates the realization of assets and the satisfaction of liabilities in the normal course of business. Our continuation as a going concern is dependent upon our ability to generate sufficient cash flow to meet our obligations on a timely basis, to obtain additional financing as may be required, or ultimately to attain profitability. Potential sources of cash, or relief of demand for cash, include additional external debt, the sale of shares of our stock or alternative methods such as mergers or sale of our assets. No assurances can be given, however, that we will be able to obtain any of these potential sources of cash. We currently require additional cash funding from outside sources to sustain existing operations and to meet current obligations and ongoing capital requirements.

Our plans for the long term continuation as a going concern include financing our future operations through sales of our common stock and/or debt and the eventual profitable exploitation of our mining properties. Our plans may also, at some future point, include the formation of mining joint ventures with senior mining company partners on specific mineral properties whereby the joint venture partner would provide the necessary financing in return for equity in the property.

The Company\`s management is confident that the continued operations of Thunder Mountain Gold can be assured by the following:

At March 31, 2015, we had $125,795 cash in our bank accounts.

Management and the Board have not undertaken plans or commitments that exceed the cash available to the Company. We do not include in this consideration any additional investment funds mentioned below. Management is committed to manage expenses of all types so as to not exceed the on-hand cash resources of the Company at any point in time, now or in the future.

We firmly believe we can outlast the current disruptions in the investment markets and continue to attract investment dollars in coming months and years. The Company will also consider other sources of funding, including potential mergers and/or additional farm-out of some of its exploration properties.

For the quarter ended March 31, 2015, net cash used for operating activities was $156,197, consisting of our net loss of $237,341, reduced by non-cash expenses and net cash provided by changes in current assets and current liabilities. There was no cash provided by investing activities for the quarter.

Our future liquidity and capital requirements will depend on many factors, including timing, cost and progress of our exploration efforts, our evaluation of, and decisions with respect to, our strategic alternatives, and costs associated with the regulatory approvals. If it turns out that we do not have enough money to complete our exploration programs, we will try to raise additional funds from a second public offering, a private placement, mergers, farm-outs or loans.

We know that additional financing will be required in the future to fund our planned operations. We do not know whether additional financing will be available when needed or on acceptable terms, if at all. If we are unable to raise additional financing when necessary, we may have to delay our exploration efforts or any property acquisitions or be forced to cease operations. Collaborative arrangements may require us to relinquish our rights to certain of our mining claims.

#### Private Placement

On September 16, 2014, the Company\`s board unanimously approved that the Private Placement remain open for an oversubscription due to demand. Through September 30, 2014, the Company had received $362,000 in gross proceeds from the Private Placement, issuing a total 7,240,000 in common stock and 3,620,000 warrants.

On February 28, 2015, the Company entered into a subscription agreement with a two individuals whereby the company sold 4,000,000 shares at US $0.05 per share. There were no warrants associated with the subscriptions. As of March 15, 2015, the Company has issued the 4,000,000 shares under this agreement, and the placement is closed.

#### Subsequent Events

None

### Contractual Obligations

During 2008 and 2009, three lease arrangements were made with land owners that own land parcels adjacent to the Company’s South Mountain patented and unpatented mining claims. The leases were for a seven-year period, with options to renew, with annual payments (based on $20 per acre) listed in the following table. The leases have no work requirements, and are the responsibility of the South Mountain Project LLC formed in 2012.

| Contractual obligations Total\* | Payments due by period Less than 1 year | 2-3 years | 3-5 years | More than 5 years |  |
| --- | ---: | ---: | ---: | ---: | ---: |
| Acree Lease (yearly, June)(1) | $9,040 | $2,260 | $4,520 | $2,260 | - |
| Lowry Lease (yearly, October)(1)(2) | $30,160 | $7,540 | $15,080 | $7,540 | - |
| Herman Lease (yearly, April) | $ 5,600 | $1,120 | $2,240 | $2,240 | - |
| **Total** | $44,800 | $10,920 | $21,840 | $12,040 | - |

Amounts shown are for the lease period years 4 through 7, a total of 1 years that remains after 2013, the second year of the lease period.

The Lowry lease has an early buy-out provision for 50% of the remaining amounts owed in the event the Company desires to drop the lease prior to the end of the first seven-year period.

### Critical Accounting Policies

We have identified our critical accounting policies, the application of which may materially affect the financial statements, either because of the significance of the financials statement item to which they relate, or because they require management’s judgment in making estimates and assumptions in measuring, at a specific point in time, events which will be settled in the future. The critical accounting policies, judgments and estimates which management believes have the most significant effect on the financial statements are set forth below:

a)

Estimates. Our management routinely makes judgments and estimates about the effect of matters that are inherently uncertain. As the number of variables and assumptions affecting the future resolution of the uncertainties increase, these judgments become even more subjective and complex. Although we believe that our estimates and assumptions are reasonable, actual results may differ significantly from these estimates. Changes in estimates and assumptions based upon actual results may have a material impact on our results of operation and/or financial condition.

b)

Stock-based Compensation. The Company records stock-based compensation in accordance with ASC 718, “Compensation – Stock Compensation” using the fair value method. All transactions in which goods or services are the consideration received for the issuance of equity instruments are accounted for based on the fair value of the consideration received or the fair value of the equity instrument issued, whichever is more reliably measurable.

c)

Income Taxes. We have current income tax assets recorded in our financial statements that are based on our estimates relating to federal and state income tax benefits. Our judgments regarding federal and state income tax rates, items that may or may not be deductible for income tax purposes and income tax regulations themselves are critical to the Company’s financial statement income tax items.

## Controls and procedures

As filed, 851 characters.

Pursuant to Section 1503(a) of the Dodd-Frank Wall Street Reform and Consumer Protection Act of 2010 (the “Dodd-Frank Act”), issuers that are operators, or that have a subsidiary that is an operator, of a coal or other mine in the United States are required to disclose in their periodic reports filed with the SEC information regarding specified health and safety violations, orders and citations, related assessments and legal actions, and mining-related fatalities.

During the quarter ended March 31, 2015, the Company did not have any operating mines and therefore had no such specified health and safety violations, orders or citations, related assessments or legal actions, mining-related fatalities, or similar events in relation to the Company’s United States operations requiring disclosure pursuant to Section 1503(a) of the Dodd-Frank Act.

Filed May 14, 2015.
Source: SEC EDGAR, the filing index for accession 0001052918-15-000241. Last ingested by Listed: Nov 12, 2026, 20:56 ET. No prices; not investment advice.
