# Thunder Mountain Gold Inc: Form 10-Q for the period ended Mar 31, 2018

- Company: [Thunder Mountain Gold Inc](/companies/thmg.md) (CIK 711034)
- Form: 10-Q
- Filed: 2018-05-09
- Accepted by EDGAR: May 9, 2018, 16:22 ET
- Period: 2018-03-31
- Accession: 0001052918-18-000162
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/711034/000105291818000162/thmg10qmay8-18.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/711034/000105291818000162/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2018-03-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Net income | 3 months, 2018-01-01 to 2018-03-31 | −$203.3k | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months, 2018-01-01 to 2018-03-31 | $0.00 | us-gaap:EarningsPerShareBasicAndDiluted |
| Operating cash flow | 3 months, 2018-01-01 to 2018-03-31 | −$93.7k | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Cash and equivalents | at 2018-03-31 | $125.3k | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2018-03-31 | $162.5k | us-gaap:AssetsCurrent |
| Total assets | at 2018-03-31 | $1.0m | us-gaap:Assets |
| Current liabilities | at 2018-03-31 | $1.4m | us-gaap:LiabilitiesCurrent |
| Total liabilities | at 2018-03-31 | $1.5m | us-gaap:Liabilities |
| Shareholders' equity | at 2018-03-31 | −$450.1k | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 28,831 characters.

The following Management’s Discussion and Analysis of Financial Condition and Results of Operation (“MD&A”) is intended to help the reader understand our financial condition. MD&A is provided as a supplement to, and should be read in conjunction with, our financial statements and the accompanying integral notes (“Notes”) thereto. The following statements may be forward-looking in nature and actual results may differ materially.

### Plan of Operation:

*FORWARD LOOKING STATEMENTS: The following discussion may contain forward-looking statements that involve a number of risks and uncertainties. Factors that could cause actual results to differ materially include the following: inability to locate property with mineralization, lack of financing for exploration efforts, competition to acquire mining properties; risks inherent in the mining industry, and risk factors that are listed in the Company's reports and registration statements filed with the Securities and Exchange Commission.*

The Company’s financial position remained unchanged during the first three months of 2018, as metals commodity markets seem to have improved during this period. Junior mining equity markets may strengthen periodically in response to favorable price movements in certain metals during 2017 and 2018, providing some companies with the opportunity to take advantage of short periods of positive sentiment in the market. However, until capital markets in the Junior Mining space become favorable, equity financing in the mining industry will remain challenging. Analyst estimates for the remainder of 2018 are for stabilizing precious metals markets, along with stable and improving prices for zinc, copper and lead.

The Company operated on a limited budget during 2017 and into 2018, funding the maintenance of the South Mountain Project while continuing to search for additional financing to advance the Project. The Company’s plan of operation for the next twelve months, subject to business conditions, will be to continue to develop the South Mountain Project and complete an industry standard Feasibility Study. The completion of any such study is highly dependent on the ability of the Company to secure additional financing.

Work on the Trout Creek Project will continue in 2018, although the South Mountain Project will remain the focus. At the Trout Creek Project, the Company plans to drill pre-defined drill targets that were established during the Joint Exploration Agreement with Newmont Mining. The data developed from the drilling will be analyzed and prepared for further exploration in the 2018/2019 season. Additionally, the Company will continue geophysical interpretation of the valley area and explore the possibility of combining the Company\`s land position with another entity exploring this trend.

### South Mountain Project, Owyhee County, Idaho

The land package at South Mountain consists of a total of approximately 1,518 acres, consisting of (i) 17 patented claims (326 acres) and 360 acres of private land; (ii) lease on private ranch land (542 acres); and, (iii) 21 unpatented lode mining claims on BLM managed land (290 acres). All holdings are located in the South Mountain Mining District, Owyhee County, Idaho.

The property is located approximately 70 air miles southwest of Boise, Idaho and approximately 24 miles southeast of Jordan Valley, Oregon. It is accessible by highway 95 driving south from the Boise area to Jordan Valley Oregon, then by traveling southeast approximately 22 miles back into Idaho, via Owyhee County road that is dirt and improved to within 4 miles of historic mine site. The last 4 miles up the South Mountain Mine road are unimproved dirt road. The property is accessible year-round to within 4 miles of the property, where the property is accessible from May thru October without plowing snow. There is power distribution within 4 miles of the site as well. The climate is considered high desert. The Company has water rights on the property, and there is a potable spring on the property that once supplied water to the main camp.

### Property History

The limited historic production peaked during World War II when, based on smelter receipts, the production of direct shipped ore totaled 53,653 tons containing 3,118 ounces of gold, 566,439 ounces of silver, 13,932 pounds of copper, 2,562,318 pounds of lead and 15,593,061 pounds of zinc. In addition to the direct-ship ore, a flotation mill was constructed and operated during the late-1940s and early-1950s.

| Metal | Grade | Total Metal |
| --- | --- | --- |
| Gold Silver Copper Lead Zinc | 0.058 opt 10.6 opt 1.4% 2.4% 14.5% | 3,120 ozs 566,440 ozs 1,485,200 lbs 2,562,300 lbs 15,593,100 lbs |

### Anaconda Crude Ore Shipments: 1941-1953 Total Tons: 53,653

South Mountain Mines Inc. (an Idaho Corporation) owned the patented claims from 1975 to the time the Company purchased the entity in 2007. They conducted extensive exploration work including extending the Sonneman Level by approximately 1,500 feet to intercept the down-dip extension of the Texas sulfide mineralization mined on the Laxey Level approximately 400 feet up-dip from the Sonneman. High grade sulfide mineralization was intercepted and confirmed on the Sonneman Extension. In 1985 South Mountain Mines Inc. completed a feasibility study based on historic and newly developed ore zones exposed in their underground workings and drilling. This resulted in a historic resource of approximately 470,000 tons containing 23,500 ounces of gold, 3,530,000 ounces of silver, 8,339,000 pounds of copper, 13,157,000 pounds of lead and 91,817,000 pounds of zinc. Although they determined positive economics, and that the resource was still open at depth with a large upside potential, the project was shut down and placed into care and maintenance.

In 2008, the Company contracted Kleinfelder, Inc., a nationwide engineering and consulting firm, to complete a technical report “Resources Data Evaluation, South Mountain Property, South Mountain Mining District, Owyhee County, Idaho”. The technical report was commissioned by Thunder Mountain Resources, Inc. to evaluate all the existing data available on the South Mountain property. Kleinfelder utilized a panel modeling method using this data to determine potential mineralized material remaining and to make a comparison with the resource determined by South Mountain Mines in the mid-1980s.

Additional drilling and sampling will be necessary before the resource can be classified as a mineable reserve, but Kleinfelder’s calculations provided a potential resource number that is consistent with South Mountain Mines’ (Bowes 1985) reserve model.

Late in 2009, the Company contracted with Northwestern Groundwater & Geology to incorporate all the new drill and sampling data into an NI 43-101 Technical Report. This report was completed as part of the Company’s dual listing on the TSX Venture Exchange in 2010.

In January of 2018, the Company engaged Hard Rock Consulting LLC from Denver Colorado to update the South Mountain Project 43-101. When completed, the updated NI 43-101 can be reviewed on the Company\`s website at www.thundermountaingold.com, or on www.SEDAR.com.

### 2012 through 2017 Highlights of South Mountain drilling and development work:

The assay results from 2012 through 2014 pre-development work confirm that there is significant upside to the resource. The results further reinforce the exceptional continuity of high-grade zinc/silver mineralization at South Mountain along the strike of the well-mineralized trend. Both the upper Texas and the DMEA ore shoots were drilled to define the continuity of up- and down-dip sulfide mineralization. Although additional definition drilling is necessary, positive results showed excellent grades and continuity. Additionally, the Sonneman and Laxey levels of the mine were opened and refurbished, with 2,700 feet of 14 X 14-foot development-ready drifts and drill stations developed on the Sonneman level, along with 720 feet of 10’ X 10’ drift rehabilitation on the Laxey Level.

Underground core holes DM2UC13-13 through DM2UC13-18 have further confirmed the continuity of the DMEA down-dip, enabling the connection between the open visible massive sulfide on the Sonneman, with the earlier core hole intercept drilled some 400 feet below the Sonneman Level from the surface.

Management is very encouraged with the positive drilling results at South Mountain. With the drift rehabilitation underground, tremendous down dip potential of these high-grade zinc, silver, gold, copper, and lead zones, has emerged, with polymetallic mineralization that could be incorporated into the early years of the South Mountain mine plan. Given the associated economic upside of such a scenario, the Company plans to aggressively delineate the full extent of the mineralization at South Mountain.

***Figure 2. Typical long section along strike showing the orientation of the massive sulfide replacement zones at South Mountain, along with and in relation to the two main drifts.***

Assays show that rib sampling on the Sonneman reported during the development of the Sonneman Level during 2012-2013 several massive sulfide mineralized zones were mined through. **HIGHLIGHT: Rib Sample Results on Sonneman: 80 Feet of 21.9% Zinc, 0.147 opt Gold, 4.76 opt Silver, 0.38% Copper and 0.51% Lead.**

Detailed rib sampling along some of these massive sulfide zones yielded the following results:

| Location / Ore Shoot | Mineralized Length (Feet) | Drift Station (ft) | Gold (ozs/ton) | Silver (ozs/ton) | Zinc | Copper | Lead |
| --- | ---: | ---: | --- | --- | ---: | ---: | ---: |
| DMEA 2 | 80 | 2100 | 0.147 opt | 4.76 opt | 21.9% | 0.38% | 0.51% |
| DMEA 3 | 15 | 2200 | 0.354 opt | 5.63 opt | 20.2% | 2.71% | 0.60% |
| Muck Bay 4 | 30 | 1480 | 0.005 opt | 6.30 opt | 1.9% | 1.00% | 0.50% |
| Muck Bay 4 B | 15 | 1500 | 0.005 opt | 6.71 opt | 14.1% | 2.30% | 0.59% |
| Muck Bay 3 | 30 | 1078 | Tr | 6.23 opt | 7.5% | 0.36% | 3.77% |
| Laxey Shaft Rind | 25 | 778 | 0.02 opt | 15.0 opt | 18.5% | 0.41% | 1.03% |

***Note: Sample channel lengths were 5 to 10 feet. All samples were analyzed by ALS Chemex.***

A detailed underground fan drilling program commenced as soon as the surface drilling program was completed. Drilling on the DMEA 2 and Texas massive sulfide zones were planned in order to define a mineable resource, but unfortunately the program was terminated after the first fan was drilled in the DMEA 2 down dip target. The results of the drilling are summarized below:

| DMEA 2 Core Hole | Length | Dip | Intercept Footage | Gold | Silver | Zinc | Copper | Lead |
| --- | ---: | ---: | --- | --- | --- | ---: | ---: | ---: |
| DM2UC13-13 | 329 | -24 | 162-184 (22) | 0.086 opt | 4.72 opt | 12.31% | 0.48% | 1.56% |
| DM2UC13-14 | 363 | -17 | 163.5-256.5 (93) | .082 opt | 12.77 opt | 13.79% | 0.45% | 7.07% |
| DM2UC13-14 |  |  | 301-331 (30) | 0.127 opt | 3.17 opt | 14.46% | 0.29% | 0.67% |
| DM2UC13-15 | 298 | -31 | 98-108 (10) | 0.01 opt | 6.84 opt | 8.30% | 1.88% | 0.16% |
| DM2UC13-16 | 306 | -36 | 85-111 (26) | 0.01 opt | 5.40 opt | 3,89% | 1.55% | 0.34% |
| DM2UC13-17 | 347 | -12 | 210-322 (112) | 0.07 opt | 2.31 opt | 9.84% | 0.36% | 0.28% |
| DM2UC13-18 | 347 | -47 | 95-103 (8) | Tr | 0.53 opt | 2.60% | minor | 0.28% |

***Results from the first drill fan testing the down dip extension of the historic DMEA ore zones.***

More than 15,000 feet (4,500 meters) have been drilled at South Mountain and included in the model. The South Mountain historic ore zones remain open down-dip on the zones encountered (see Figure 2). The continuing drilling successes proves that the South Mountain resource continues to grow with potential to increase the resource substantially. An updated NI 43-101 was initiated in early 2018 and is expected to be completed around May 15, 2018. Hard Rock Consulting LLC has been engaged to complete the study.

Two underground core rigs are planned for extending and updating the South Mountain resource - testing the continuity and down-dip extensions of the high-grade polymetallic massive sulfide zones. One core drill will begin on the DMEA and Laxey zones to complete the confirmation and extensional drilling, while the other core drill will focus primarily on the Texas zone to extend resources at depth beyond the current inferred resource area. In Addition, bulk samples will be mined for metallurgical test work..

Qualified Person – Edward D. Fields is the Qualified Person as defined by National Instrument 43-101 responsible for the technical data reported in this news release.

This property is without known reserves and the proposed program is exploratory in nature according to Instruction 3 to paragraph (b)(5) of Industry Guide 7. There are currently no permits required for conducting exploration in accordance with the Company\`s current board approved exploration plan.

### Trout Creek Project, Lander County, Nevada

The Trout Creek gold exploration project is a pediment target located along the western flank of the Shoshone Mountain Range in the Reese River Valley in Lander County, Nevada. The claim package consists of 78 unpatented mining claims (approximately 1560 acres) that are situated along a recognizable structural zone in the Eureka-Battle Mountain mineralized gold trend. Thunder Mountain maintained a joint venture agreement with Newmont Mining on some of their adjoining mineral rights sections and aliquot parcels from 2011 thru 2016. On October 27, 2016 the Company terminated the exploration agreement with Newmont Mining Corporation to concentrate their efforts on the South Mountain Project. The Company retained the 78-claim package by paying annual fees to BLM of $3,255 and Lander County $940 fees.

The Project is located approximately 155 air miles northeast of Reno, Nevada, or approximately 20 miles south of Battle Mountain, Nevada, in Sections 10, 11, 14, 16, 21, 22, 27; T.29N.; R.44E. Mount Diablo Baseline & Meridian, Lander County, Nevada. Latitude: 40 23’ 36” North, Longitude: 117 00’ 58” West. The property is accessible by traveling south from Battle Mountain Nevada on state highway 305, which is paved. The project is generally accessible year-round and there are no improvements on the property.

The Trout Creek target is anchored by a regional gravity anomaly on a well-defined northwest-southeast trending break in the alluvial fill thickness and underlying bedrock. Previous geophysical work in the 1980s revealed an airborne magnetic anomaly associated with the same structure, and this was further verified and outlined in 2008 by Company personnel using a ground magnetometer. The target is covered by alluvial fan deposits of generally unknown thickness shed from the adjacent Shoshone Range, a fault block mountain range composed of Paleozoic sediments of both upper and lower plate rocks of the Roberts Mountains thrust.

An extensive data package on the area was made available to Thunder Mountain Gold by Newmont during the joint exploration agreement period (2011-2016) that significantly enhanced the target area. This, along with fieldwork consisting of mapping and sampling the altered and mineralized structures that can be followed through the Shoshone Range. Of importance is that these structures align with the Cortez-Pipeline deposits and the Phoenix deposit (part of the Eureka-Battle Mountain-Getchell Trend).

In addition to the geologic fieldwork, Wright Geophysics conducted a ground gravity survey and CSMAT over the pediment target area and this provided insight into the gravel-bedrock contact as well as defining the favorable structural setting within the buried bedrock. An untested drill target was identified under the gravel pediment along these structures, and the geophysics showed that the bedrock was within a reasonable depth for exploration drilling and potential mining if a significant mineralization is encountered.

Thunder Mountain Gold plans to conduct further exploration in 2018 on this attractive pediment gold target. The Company anticipates that funding will be available during the 2018 season and one or two reverse circulation holes can test the bedrock beneath the gravel along the mineralized structures. A detailed list of claims controlled by the Company can be found in the Company\`s Form 10K filed on Edgar.

The ongoing exploration field work, including claim maintenance and assessment, is financed by the Company through sales of unregistered common stock funded by the Company through private placements with accredited investors. Future work will be funded in the same manner or through a strategic partnership with another mining company.

There are currently no environmental permits required for the planned exploration work on the property. In the future, a notice of intent may be required with the Bureau of Land Management. This property is without known reserves and the proposed program is exploratory in nature according to Instruction 3 to paragraph (b)(5) of Industry Guide 7.

### Competition

We are an exploration stage company. We compete with other mineral resource exploration and development companies for financing and for the acquisition of new mineral properties. Many of the mineral resource exploration and development companies with whom we compete have greater financial and technical resources than us. Accordingly, these competitors may be able to spend greater amounts on acquisitions of mineral properties of merit, on exploration of their mineral properties and on development of their mineral properties. In addition, they may be able to afford greater geological expertise in the targeting and exploration of mineral properties. This competition could result in competitors having mineral properties of greater quality and interest to prospective investors who may finance additional exploration and development. This competition could adversely impact on our ability to finance further exploration and to achieve the financing necessary for us to develop our mineral properties.

### Employees

At March 31, 2018, SMMI has deferred payroll of $949,500. These salaries were earned in accordance with the OGT LLC operating agreement. OGT management includes SMMI\`s Eric Jones, Jim Collord, and Larry Thackery as CFO. These salaries will continue to be deferred until a later date.

### Results of Operations:

The Company recognized no revenues and had no production for the three months ending March 31, 2018. Total operating expenses for the three months ending March 31, 2018 of $188,912 decreased from the same respective time frame ending 2017 by $49,121 or 21%. Exploration expenses for the three months ended March 31, 2018 increased by $8,465 when compared to same period in 2017. This increase can be attributed to the engagement of Hard Rock Consulting LLC to update the NI 43-101. Legal and accounting costs decreased from 2017 by $2,943 for a total of $27,561. Management and administrative expense decreased by $44,681 or 33%, or a total mostly due to stock based compensation of $53,557 issued to our directors in March 2017.

### Liquidity and Capital Resources:

The consolidated financial statements for the period ending March 31, 2018, disclose a ‘going concern’ qualification to our ability to continue in business. The consolidated financial statements for the period then ended have been prepared under the assumption that we will continue as a going concern. Such assumption contemplates the realization of assets and the satisfaction of liabilities in the normal course of business. As shown in the consolidated financial statements for the period ended March 31, 2018, we did not have sufficient cash reserves to cover normal operating expenditures for the following 12 months. These factors raise substantial doubt about our ability to continue as a going concern. The consolidated financial statements do not include any adjustments that might be necessary should we be unable to continue as a going concern.

Our continuation as a going concern is dependent upon our ability to generate sufficient cash flow to meet our obligations on a timely basis, to obtain additional financing as may be required, or ultimately to attain profitability. Potential sources of cash, or relief of demand for cash, include additional external debt, the sale of shares of our stock or alternative methods such as mergers or sale of our assets. No assurances can be given, however, that we will be able to obtain any of these potential sources of cash. We currently require additional cash funding from outside sources to sustain existing operations and to meet current obligations and ongoing capital requirements.

Our plans for the long-term continuation as a going concern include financing our future operations through sales of our common stock and/or debt and the eventual profitable exploitation of our mining properties. Our plans may also, at some future point, include the formation of mining joint ventures with senior mining company partners on specific mineral properties whereby the joint venture partner would provide the necessary financing in return for equity in the property.

While the Company does not currently have cash sufficient to support the currently planned aggressive exploration work at South Mountain, we believe that the survivability of Thunder Mountain Gold can be assured by the following:

April 27, 2018, we had $127,294 cash in our bank accounts.

Management and the Board have not undertaken plans or commitments that exceed the cash available to the Company beyond fiscal year 2018. We do not include in this consideration any additional investment funds mentioned below. Management is committed to manage expenses of all types to not exceed the on-hand cash resources of the Company at any point in time, now or in the future.

The Company will also consider other sources of funding, including potential mergers and/or additional farm-out of some of its exploration properties.

For the three months ended March 31, 2018, net cash used for operating activities was $93,743, consisting of net loss of $203,306 for the three months ended March 31, 2018, reduced by non-cash expenses and net cash provided by changes in current assets and current liabilities. Cash provided by financing activities for three months ended March 31, 2018 totaled $182,567.

Our future liquidity and capital requirements will depend on many factors, including timing, cost and progress of our exploration efforts, our evaluation of, and decisions with respect to, our strategic alternatives, and costs associated with the regulatory approvals. If it turns out that we do not have enough money to complete our exploration programs, we will try to raise additional funds from a public offering, a private placement, mergers, farm-outs or loans.

We know that additional financing will be required in the future to fund our planned operations. We do not know whether additional financing will be available when needed or on acceptable terms, if at all. If we are unable to raise additional financing when necessary, we may have to delay our exploration efforts or any property acquisitions or be forced to cease operations. Collaborative arrangements may require us to relinquish our rights to certain of our mining claims.

#### Private Placement

On January 18, 2016, Thunder Mountain Gold, Inc. initiated a private offering to purchase, in the aggregate, 6,700,000 shares of common stock. There was no minimum offering. The minimum individual subscription was $25,000 for non-insiders. Participation was limited to six people, most of whom were officers and directors, and two accredited investors. There was no placement agent fee paid in the offering, and no accountable or unaccountable expense allowance. The closing date for the financing was January 22, 2016, and the Company received $285,000 in cash proceeds and $50,000 as a reduction of related party notes payable.

On February 20, 2018, the Board of Directors approved a Private Placement financing of up to $750,000 from the sale of equity units at a price of $0.14 per unit. Each unit consists of one share of the Company’s common stock and one-half of one common share purchase warrant. Each whole warrant entitles the holder to purchase one additional share of common stock of the Company at a price of $0.20 for a period of 12 months.

The offering was believed exempt from registration pursuant to the exemption for transactions by an issuer not involving any public offering under Section 4(6) the Securities Act of 1933, as amended. The securities offered, sold, and issued in connection with the private placement have not been or are not registered under the Securities Act of 1933, as amended, or any state securities laws and may not be offered or sold in the United States absent registration with the Securities and Exchange Commission or an applicable exemption from the registration requirements.

### Subsequent Events

On April 27, 2018 the Company closed its Private Placement, approved by the Board of Directors on February 20,2018. The Company received net proceeds of $357,000 from the sale of 2,550,000 units. Each Unit consists of one share of common stock, and one-half of a warrant exercisable at $0.20.

### Contractual Obligations

During 2008 and 2009, three lease arrangements were made with land owners that own land parcels adjacent to the Company’s South Mountain patented and unpatented mining claims. The leases were for a seven-year period, with options to renew, with annual payments (based on $20 per acre) listed in the following table. The leases have no work requirements.

| Contractual obligations Total\* | Payments due by period Less than 1 year | 2-3 years | 4-5 years | More than 5 years |  |
| --- | ---: | ---: | ---: | ---: | ---: |
| Acree Lease (yearly, June)(1) | $27,120 | $3,390 | $6,780 | $6,780 | $10,170 |
| Lowry Lease (yearly, October)(1)(2) | $90,240 | $11,280 | $22,560 | $22,560 | $33,840 |
| Herman Lease (yearly, April) (1) | $ 15,120 | $1,680 | $3,360 | $3,360 | $6,720 |
| OGT LLC(3) | $50,000 | $5,000 | $10,000 | $10,000 | $25,000 |
| **Total** | $182,480 | $21,350 | $42,700 | $42,700 | $75,730 |

(1)

Amounts shown are for the lease periods years 4 through 7, a total of 1 years that remains after 2013, the second year of the lease period. Lease was extended an additional 10 years at $30/acre.

(2)

The Lowry lease has an early buy-out provision for 50% of the remaining amounts owed in the event the Company desires to drop the lease prior to the end of the first seven-year period.

(3) OGT LLC, managed by the Company’s wholly-owned subsidiary SMMI, receives a $5,000 per year payment for up to 10 years, or until a $5 million capped NPI Royalty is paid.

### Critical Accounting Policies

We have identified our critical accounting policies, the application of which may materially affect the financial statements, either because of the significance of the financials statement item to which they relate, or because they require management’s judgment in making estimates and assumptions in measuring, at a specific point in time, events which will be settled in the future. The critical accounting policies, judgments and estimates which management believes have the most significant effect on the financial statements are set forth below:

a)

Estimates. Our management routinely makes judgments and estimates about the effect of matters that are inherently uncertain. As the number of variables and assumptions affecting the future resolution of the uncertainties increase, these judgments become even more subjective and complex. Although we believe that our estimates and assumptions are reasonable, actual results may differ significantly from these estimates. Changes in estimates and assumptions based upon actual results may have a material impact on our results of operation and/or financial condition.

b)

Stock-based Compensation. The Company records stock-based compensation in accordance with ASC 718, “Compensation – Stock Compensation” using the fair value method. All transactions in which goods or services are the consideration received for the issuance of equity instruments are accounted for based on the fair value of the consideration received or the fair value of the equity instrument issued, whichever is more reliably measurable.

c)

Income Taxes. We have current income tax assets recorded in our financial statements that are based on our estimates relating to federal and state income tax benefits. Our judgments regarding federal and state income tax rates, items that may or may not be deductible for income tax purposes and income tax regulations themselves are critical to the Company’s financial statement income tax items.

## Controls and procedures

As filed, 1,311 characters.

### Evaluation of Disclosure Controls and Procedures

At the end of the period covered by this report, an evaluation was carried out under the supervision of, and with the participation of, the Company’s Management, including the Chief Executive Officer and Chief Financial Officer, of the effectiveness of the design and operation of the Company’s disclosure controls and procedures (as defined in Rule 13a – 15(e) and Rule 15d – 15(e) of the Securities and Exchange Act of 1934, as amended). Based on that evaluation, the Chief Executive Officer and Chief Financial Officer have concluded that as of the end of the period covered by this report, the Company’s disclosure controls and procedures were adequately designed and effective in ensuring that information required to be disclosed by the Company in its reports that it files or submits to the SEC under the Exchange Act, is recorded, processed, summarized and reported within the time period specified in applicable rules and forms.

### Changes in Internal Controls Over Financial Reporting

During the quarter covered by this report, there have been no changes in the Company’s internal control over financial reporting that have materially affected, or are reasonably likely to materially affect, the Company’s internal control over financial reporting.

Filed May 9, 2018.
Source: SEC EDGAR, the filing index for accession 0001052918-18-000162. Last ingested by Listed: Nov 12, 2026, 20:56 ET. No prices; not investment advice.
